WorldWideScience

Sample records for basin commission administrative

  1. River basin administration

    Science.gov (United States)

    Management of international rivers and their basins is the focus of the Centre for Comparative Studies on (International) River Basin Administration, recently established at Delft University of Technology in the Netherlands. Water pollution, sludge, and conflicting interests in the use of water in upstream and downstream parts of a river basin will be addressed by studying groundwater and consumption of water in the whole catchment area of a river.Important aspects of river management are administrative and policy aspects. The Centre will focus on policy, law, planning, and organization, including transboundary cooperation, posing standards, integrated environmental planning on regional scale and environmental impact assessments.

  2. Alaska Public Offices Commission, Department of Administration, State of

    Science.gov (United States)

    Visiting Alaska State Employees State of Alaska Department of Administration Alaska Public Offices Commission Alaska Department of Administration, Alaska Public Offices Commission APOC Home Commission Filer ; AO's Contact Us Administration > Alaska Public Offices Commission Alaska Public Offices Commission

  3. Commission administration. National Low-Level Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1984-09-01

    This report is one in a series of commission option documents prepared for the US Department of Energy, designed to assist regional low-level waste compact commissions in their organization, administration and efforts to effectively manage waste within their regions. In particular, this report addresses topics related to commission administrative procedures, personnel, procurement and finance

  4. 78 FR 70959 - Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2013-11-27

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary [DR.5A311.IA000514] Commission on Indian Trust Administration and Reform AGENCY: Office of the Secretary, Interior. ACTION: Notice of Renewal of the Commission... administration system to support a reasoned and factually based set of options for potential management...

  5. 78 FR 46596 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2013-08-01

    ... Trust Administration and Reform (the Commission) will hold a public meeting on August 19, 2013. During.... The management consultant will be attending the upcoming Indian Trust Commission's meeting in... Indian Trust Administration and Reform AGENCY: Office of the Secretary, Interior. ACTION: Notice of...

  6. 78 FR 70317 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2013-11-25

    ... trust assets within a two-year period and will offer recommendations to the Secretary of the Interior on... Indian Trust Administration and Reform AGENCY: Office of the Secretary, Interior. ACTION: Notice of meeting. SUMMARY: The Secretarial Commission on Indian Trust Administration and Reform (the Commission...

  7. 78 FR 21963 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2013-04-12

    ... Trust Administration and Reform (the Commission) will hold a public meeting on April 29, 2013. During the public meeting, the Commission will: gain insights about how the UN Declaration can be implemented... Indian Trust Administration and Reform AGENCY: Office of the Secretary, Interior. ACTION: Notice of...

  8. 77 FR 31378 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-05-25

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Secretarial Commission on Indian Trust... Office of the Secretary is announcing that the Secretarial Commission on Indian Trust Administration and Reform (the Commission) will hold a public meeting on June 11 and 12, 2012. The Commission has gathered...

  9. 77 FR 43855 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-07-26

    ... Secretary regarding termination. The following items will be on the agenda: Trust Commission Operations... DEPARTMENT OF THE INTERIOR Office of the Secretary Secretarial Commission on Indian Trust... Office of the Secretary is announcing that the Secretarial Commission on Indian Trust Administration and...

  10. 77 FR 64534 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-10-22

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Secretarial Commission on Indian Trust... Office of the Secretary is announcing that the Secretarial Commission on Indian Trust Administration and Reform (the Commission) will hold a public webinar meeting on November 7, 2012. The objectives of the...

  11. 77 FR 24974 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-04-26

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Secretarial Commission on Indian Trust... Office of the Secretary is announcing that the Secretarial Commission on Indian Trust Administration and Reform (the Commission) will hold a public webinar meeting on May 16, 2012. Having gathered valuable...

  12. 78 FR 32295 - Commission Meeting

    Science.gov (United States)

    2013-05-29

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: June 20...

  13. 77 FR 10599 - Commission Meeting

    Science.gov (United States)

    2012-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 15...

  14. 78 FR 12412 - Commission Meeting

    Science.gov (United States)

    2013-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 21...

  15. 78 FR 52601 - Commission Meeting

    Science.gov (United States)

    2013-08-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: September 19, 2013...

  16. 77 FR 70204 - Commission Meeting

    Science.gov (United States)

    2012-11-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the SUPPLEMENTARY INFORMATION section of this notice. DATES: December 14, 2012...

  17. 78 FR 69517 - Commission Meeting

    Science.gov (United States)

    2013-11-19

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: December 12, 2013...

  18. 77 FR 52106 - Commission Meeting

    Science.gov (United States)

    2012-08-28

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: September 20...

  19. A proposal for an administrative set up of river basin management in the Sittaung River Basin

    OpenAIRE

    Tun, Zaw Lwin; Ni, Bo; Tun, Sein; Nesheim, Ingrid

    2016-01-01

    The purpose of this report is to present a proposal for how an administrative approach based on River Basin Management can be implemented in Myanmar. The Sittaung River Basin has been used as an example area to investigate how the basin can be administered according to the IWRM principles of cooperation between the different sectors and the administrative units, including stakeholder involvement. Ministry of Natural Resource and Environmental Conservation, Myanmar Norwegian Ministry of For...

  20. 78 FR 5829 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2013-01-28

    ... Secretarial Commission on Indian Trust Administration and Reform will hold a public meeting on February 12 and... trust reform. The Commission will also host a youth outreach session on February 11, 2013, at the... DEPARTMENT OF THE INTERIOR Office of the Secretary Secretarial Commission on Indian Trust...

  1. 77 FR 28420 - Commission Meeting

    Science.gov (United States)

    2012-05-14

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: June 7, 2012, at 9...

  2. 77 FR 52340 - Meeting of the Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-08-29

    ... Trust Administration and Reform AGENCY: Office of the Secretary, Interior. ACTION: Notice of meeting. SUMMARY: The Secretarial Commission on Indian Trust Administration and Reform (the Commission) will hold a public meeting on September 13 and 14, 2012. The Commission will also host a public facilitated...

  3. 78 FR 66376 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2013-11-05

    ... Trust Administration and Reform (the Commission) will hold a public webinar meeting on November 20, 2013...'s management and administration of the trust assets within a two-year period and will offer... Indian Trust Administration and Reform AGENCY: Office of the Secretary, Interior. ACTION: Notice of...

  4. 77 FR 5528 - National Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-02-03

    ... and work plan, and reviewing past trust reform and FACA committee efforts. A final agenda will be... DEPARTMENT OF THE INTERIOR Office of the Secretary National Commission on Indian Trust... Office of the Secretary is announcing that the National Commission on Indian Trust Administration and...

  5. 77 FR 67827 - Meeting of the Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-11-14

    ... Indian Trust Administration and Reform (the Commission) will hold a public meeting on December 6 and 7, 2012. During the public meeting, the Commission will hear from invited speakers about: management and... Trust Administration and Reform AGENCY: Office of the Secretary, Interior. ACTION: Notice of meeting...

  6. 33 CFR 207.10 - Charles River, Mass.; dam of Charles River Basin Commission.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Charles River, Mass.; dam of Charles River Basin Commission. 207.10 Section 207.10 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE NAVIGATION REGULATIONS § 207.10 Charles River, Mass.; dam of...

  7. Administrative reform movements and commissions in Belgium 1848-2004

    NARCIS (Netherlands)

    N. Thijs (Nick); S.G.J. Van de Walle (Steven)

    2005-01-01

    textabstractCurrent analysis of the public administration’s dysfunctions in Belgium bears remarkable resemblance to the analyses made by numerous authors and commissions in the past 150 years. In this article, we provide an overview of the major administrative reform initiatives in

  8. 1997 N-Basin Administrative Control Level Dose Extension

    International Nuclear Information System (INIS)

    Nellesen, A.L.

    1997-04-01

    This document provides justification for extending the Administrative Control Level of 500 mrem per year to 1,000 mrem per year Total Effective Dose Equivalent for workers involved with N-Reactor Basin Deactivation in accordance with established procedures

  9. The review of constitutional norms concerning local public administration in the view of the European Commission for Democracy through Law (Venice Commission)

    OpenAIRE

    Apostolache, Mihai

    2015-01-01

    The proposals of the Commission to review the Constitution of Romania were subject to the analysis of experts from the European Commission for Democracy through Law (the Venice Commission), who expressed their opinion in a report adopted at the 98th plenary session of the European body. The article analyzes the recommendations of the Venice Commission regarding the proposed changes to the constitutional norms governing local public administration, comprising some general aspects concern...

  10. 78 FR 34384 - The President's Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting

    Science.gov (United States)

    2013-06-07

    ... GENERAL SERVICES ADMINISTRATION [Notice-MK-2013-04; Docket No. 2013-0002; Sequence 19] The President's Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting AGENCY: Office of Government-wide Policy, U.S. General Services Administration (GSA). ACTION: Meeting Notice. SUMMARY: The...

  11. 78 FR 45200 - The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting

    Science.gov (United States)

    2013-07-26

    ... GENERAL SERVICES ADMINISTRATION [Notice-MK-2013-06; Docket No. 2013-0002; Sequence 22] The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting AGENCY: Office of Government-wide Policy, U.S. General Services Administration (GSA). ACTION: Meeting Notice. SUMMARY: The...

  12. 78 FR 38042 - The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting...

    Science.gov (United States)

    2013-06-25

    ... GENERAL SERVICES ADMINISTRATION [Notice--MK-2013-05; Docket No. 2013-0002; Sequence 20] The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting; Correction AGENCY: Office of Government-wide Policy, U.S. General Services Administration (GSA). ACTION: Meeting notice...

  13. 78 FR 52531 - The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting

    Science.gov (United States)

    2013-08-23

    ... GENERAL SERVICES ADMINISTRATION [Notice-MK-2013-07; Docket No. 2013-0002; Sequence 24] The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting AGENCY: Office of Government-wide Policy, U.S. General Services Administration (GSA). ACTION: Meeting Notice. SUMMARY: The...

  14. 78 FR 55079 - The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meetings

    Science.gov (United States)

    2013-09-09

    ... GENERAL SERVICES ADMINISTRATION [Notice-MK-2013-08; Docket No. 2013-0002; Sequence 27] The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meetings AGENCY: Office of Government-wide Policy, U.S. General Services Administration (GSA). ACTION: Meeting notice. SUMMARY: The...

  15. 78 FR 64942 - The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting

    Science.gov (United States)

    2013-10-30

    ... GENERAL SERVICES ADMINISTRATION [Notice-MK-2013-10; Docket No. 2013-0002; Sequence 32] The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting AGENCY: Office of Government-Wide Policy, U.S. General Services Administration (GSA). ACTION: Meeting notice. SUMMARY: The...

  16. 78 FR 35272 - The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting

    Science.gov (United States)

    2013-06-12

    ... GENERAL SERVICES ADMINISTRATION [Notice-MK-2013-05; Docket No. 2013-0002; Sequence 20] The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting AGENCY: Office of Government-wide Policy, U.S. General Services Administration (GSA). ACTION: M eeting notice. SUMMARY: The...

  17. 78 FR 69416 - The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting

    Science.gov (United States)

    2013-11-19

    ... GENERAL SERVICES ADMINISTRATION [Notice-MK-2013-11; Docket No. 2013-0002; Sequence No. 36] The Presidential Commission on Election Administration (PCEA); Upcoming Public Advisory Meeting AGENCY: Office of Government-Wide Policy, U.S. General Services Administration (GSA). ACTION: Meeting Notice. SUMMARY: The...

  18. 78 FR 30324 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2013-05-22

    ... improvement. The management consultant will also be assessing past trust reform efforts and capturing current... consultant will be attending the upcoming Indian Trust Commission's meeting in Oklahoma City and will be... Indian Trust Administration and Reform AGENCY: Office of the Secretary, Interior. ACTION: Notice of...

  19. Gulf Regional Planning Commission scenario planning workshop : sponsored by the Federal Highway Administration

    Science.gov (United States)

    2016-03-01

    This report summarizes noteworthy practices shared during a scenario planning workshop, hosted by the Gulf Regional Planning Commission, on March 15-16, 2016, in Biloxi, Mississippi. The Federal Highway Administration (FHWA) sponsored this event as p...

  20. The Analysis of Public Administration Reforms in Macedonia and the Evaluation of the Performance of Public Administration by the European Commission

    OpenAIRE

    Abdula Azizi

    2011-01-01

    The objective of this paper is to underline the deficiencies in the funcioning of Public Administration in the Republic of Macedonia. The issue of Public Administration reforms in Macedonia has been dealt with by other scholars, but the European Commission reports have not been analyzed years after receiving the status of candidate country for EU membership. The results will reflect the realistic assessments and objective perceptions of citizens about the functioning of Public Administration,...

  1. 17 CFR Appendix A to Part 10 - Commission Policy Relating to the Acceptance of Settlements in Administrative and Civil Proceedings

    Science.gov (United States)

    2010-04-01

    ... the Acceptance of Settlements in Administrative and Civil Proceedings A Appendix A to Part 10... Appendix A to Part 10—Commission Policy Relating to the Acceptance of Settlements in Administrative and... of law to be made in the settlement order entered by the Commission or a court. In accepting a...

  2. Office of Inspector General report on audit of the Western Area Power Administration`s contract with Basin Electric Power Cooperative

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-25

    At the request of the Western Area Power Administration (Western), an audit of 17 areas was conducted with respect to possible overcharges on a power contract between Western and Basin Electric Power Cooperative (Basin), Contract No. DE-MP65-82WP-19001. The contract for Western`s purchase of electric power from Basin was entered into on April 15, 1982, and was in effect from January 1, 1986, through October 31, 1990. During this 58-month period, Basin billed Western approximately $197.6 million. Overall, it was found that Basin overcharged Western approximately $23.8 million. These overcharges occurred because Basin: (1) did not recognize or amortize as gain its overestimate of completion and correction costs for Antelope Valley Station (AVS) Unit 2; (2) did not amortize the gain on the sale/leaseback of AVS Unit 2 as an offset to lease costs; (3) billed Western prematurely for lease and interest costs; (4) overcharged for the cost of coal by including administrative and general expenses and profit, as well as incorrectly calculating discounts, royalty payments, and imputed interest costs; (5) made faulty calculations of amortization rates for deferred costs; (6) used a shorter depreciation period for AVS common facilities than it had used for other power plants; (7) retained tax benefit transfers; and (8) charged Western for interest and depreciation that had been paid by others. In addition to the $23.8 million in overcharges, interest accrued on the overcharges through December 31, 1996 was estimated to be approximately $22.1 million, resulting in a total of $45.9 million due Western.

  3. 18 CFR 410.1 - Basin regulations-Water Code and Administrative Manual-Part III Water Quality Regulations.

    Science.gov (United States)

    2010-04-01

    ... Code and Administrative Manual-Part III Water Quality Regulations. 410.1 Section 410.1 Conservation of... CODE AND ADMINISTRATIVE MANUAL-PART III WATER QUALITY REGULATIONS § 410.1 Basin regulations—Water Code and Administrative Manual—Part III Water Quality Regulations. (a) The Water Code of the Delaware River...

  4. Commission 1

    African Journals Online (AJOL)

    state" to provide the Commission with information on the measures that they have ...... policies and identify the gaps in ensuring the full realisation of socio- economic .... Boulle L, Harris Band Hoexter C Constitutional and Administrative Law.

  5. Commission on Legal Matters

    CERN Multimedia

    Staff Association

    2016-01-01

    What is a commission within the Staff Association (SA)? A commission is a working group of the CERN Staff Council, led by a staff representative. The commission is composed mainly of staff representatives, but interested members of the SA can apply to participate in the work of a commission. What is the commission on legal matters? The commission on legal matters works on texts governing the employment conditions of staff (Employed Members of Personnel and Associated Members of Personnel). This covers legal documents such as the Staff Rules and Regulations, administrative and operational circulars, as well as any other document relating to employment conditions. How is the work organised in this commission? The revision process of the text is generally done along following lines: The HR department, and its legal experts, proposes new texts or modifications to existing texts. A schedule for the study of these texts is established each year and this calendar by the commission to plan its work. The new or modi...

  6. 28 CFR 2.207 - Supervision reports to Commission.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Supervision reports to Commission. 2.207 Section 2.207 Judicial Administration DEPARTMENT OF JUSTICE PAROLE, RELEASE, SUPERVISION AND RECOMMITMENT OF PRISONERS, YOUTH OFFENDERS, AND JUVENILE DELINQUENTS District of Columbia Supervised Releasees § 2.207 Supervision reports to Commission. A...

  7. Alien invasive species and biological pollution of the Great Lakes Basin ecosystem[Great Lakes Water Quality Board : Report to the International Joint Commission

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-05-01

    The displacement of important native species in the Great Lakes is a result of an invasion by a succession of non indigenous aquatic species. These invasion also resulted in interference with the proper human water uses and cost billions of dollars. The problem was considered serious enough that the International Joint Commission asked the Great Lakes Water Quality Board in 1999 to review the regulations in place and make recommendations, if necessary, for the implementation of additional measures that could be considered to keep control over the introduction of alien invasive species. Escapes from aquaria, aquaculture, research and educational facilities, canal and diversion water flows, and release of live bait are all sources of this invasion. The effectiveness of alternative technologies to control the invasion was to be examined by the Board. Other efforts taking place to address the situation in the basin are being complemented by the publication of this report. It is considered that the most important source of alien invasive species (AIS) to the Great Lakes is the discharge of ballast water from shipping vessels coming from outside the United States and Canada. A major concern is the role played by vessels reporting no ballast on board (NOBOB) upon entering the basin. A number of recommendations were made concerning: (1) implementation and enforcement of the ballast water discharge standards agreed upon by both countries, (2) the evaluation of the effectiveness of alternative technologies to achieve ballast water discharge standards over the long term, combined with the use of chemical treatment while the evaluation is being performed, (3) the implementation of optimal management practices to control sediments in shipping vessels, (4) modifications to the design of shipping vessels, and (5) the monitoring and contingency plans in the event of a repeat scenario in the future. Composed of an equal number representatives from the United States and Canada, at

  8. Hydrologic Sub-basins of Greenland

    Data.gov (United States)

    National Aeronautics and Space Administration — The Hydrologic Sub-basins of Greenland data set contains Geographic Information System (GIS) polygon shapefiles that include 293 hydrologic sub-basins of the...

  9. 77 FR 71426 - Advisory Commission on Childhood Vaccines; Notice of Meeting

    Science.gov (United States)

    2012-11-30

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Health Resources and Services Administration Advisory Commission on Childhood Vaccines; Notice of Meeting AGENCY: Health Resources and Services Administration, HHS... Commission on Childhood Vaccines, December 6, 2012, in the Parklawn Building (and via audio conference call...

  10. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  14. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission Issuance

    International Nuclear Information System (INIS)

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-11-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1992-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Diversity for sustainability: learning from the Murray-darling basin experience

    International Nuclear Information System (INIS)

    Syed, J.

    2005-01-01

    This paper investigates the inter-link between cultural diversity and biodiversity in the Indus basin in Pakistan with an aim to explore its impact on the environmental sustainability. I argue that culture is an important intermediary between behavior and environment, influencing social participation and environmental action and consequently sustainable development. Thus a better understanding of the interdependence between cultural and biological diversity is an essential prerequisite for the effective protection of both (people and environment). refer to and describe the Murray-Darling Basin Commission in Australia as a useful model for environmental sustainability. I argue that the Murray-Darling Basin Commission's model is useful due to: its focus on indigenous life as much as formal education, its involvement in multi-modal environmental literacies, and its emphasis on process and participation resulting in improved activity and ownership in the local communities. Within this context, I identify a number of issues as important for sustainability of the riverine environment in the Indus basin. I propose that the implementation of this model will result in increased awareness and dynamism vital for the environmental sustainability in the Indus basin. (author)

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1986-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Danials of Petitions for Rulemaking (DPRM)

  14. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1989-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuance received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1986-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1988-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-06-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1990-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety And Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1985-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  15. 5 CFR 5001.103 - Impartiality determinations for members of the Interstate Commerce Commission.

    Science.gov (United States)

    2010-01-01

    ... of the Interstate Commerce Commission. 5001.103 Section 5001.103 Administrative Personnel INTERSTATE COMMERCE COMMISSION SUPPLEMENTAL STANDARDS OF ETHICAL CONDUCT FOR EMPLOYEES OF THE INTERSTATE COMMERCE COMMISSION § 5001.103 Impartiality determinations for members of the Interstate Commerce Commission. A member...

  16. Hydrologic Sub-basins of Greenland, Version 1

    Data.gov (United States)

    National Aeronautics and Space Administration — The Hydrologic Sub-basins of Greenland data set contains Geographic Information System (GIS) polygon shapefiles that include 293 hydrologic sub-basins of the...

  17. Watershed Planning Basins

    Data.gov (United States)

    Vermont Center for Geographic Information — The Watershed Planning Basin layer is part of a larger dataset contains administrative boundaries for Vermont's Agency of Natural Resources. The dataset includes...

  18. 46 CFR 502.4 - Authentication of rules or orders of Commission.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Authentication of rules or orders of Commission. 502.4 Section 502.4 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS RULES OF PRACTICE AND PROCEDURE General Information § 502.4 Authentication of rules or orders of Commission. All rules...

  19. The reorganisation of the French Atomic Energy Commission

    International Nuclear Information System (INIS)

    Glaize, G.

    1977-01-01

    The Atomic Energy Commission (CEA) has somewhat distinctive features when compared to other French public administrations. The Commission had been designed, when created in 1945, as a body very close to the Head of Government with, at the same time, great freedom of action; these two aspects demonstrated the importance accorded to its duties and the desire to assure its efficiency. The evolution of the Commission subsequently resulted in reducing these differences and strengthening the ministerial supervision as well as the role of the Administrator-General as compared with that of the High Commissioner. In the 1970s the Commission's structures developed in another direction, in view of the reorientation of its duties in the perspective of the development of the private nuclear sector and the increasing importance of nuclear safety questions. This reorganisation resulted in the creation of fairly autonomous operational units and a number of subsidiary bodies and specialised institutes. The outcome of this exercise has been to give the CEA a very diversified structure which is not as centralised as previously. (NEA) [fr

  20. 47 CFR 0.463 - Disclosure of Commission records and information in legal proceedings in which the Commission is...

    Science.gov (United States)

    2010-10-01

    ... deliberative processes of the Commission would be compromised; (3) Disclosure of the records or the testimony... administrative proceedings, compromise constitutional rights, reveal the identity of an intelligence source or...

  1. H.R.2427: A bill making appropriations for energy and water development for the fiscal year ending September 30, 1992, and for other purposes, introduced in the US House of Representatives, One Hundred Second Congress, First Session, May 22, 1991

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Appropriations are provided for expenses necessary for the collection and study of basic information pertaining to river and harbor, flood control, and shore protection; for prosecuting work of flood control; for the preservation, operation, maintenance, and care of existing river and harbor, flood control, and related works; and for administration of laws pertaining to regulation of navigable waters and wetlands. Appropriations are detailed for the Department of Defense, Civil Department of the Army; Department of the Interior, Bureau of Reclamation; Department of Energy for energy supply, research and development activities, general science and research activities, nuclear waste disposal fund, isotope production and distribution program fund, atomic energy defense activities, power marketing administrations, and minority participation in the superconducting super collider. Additional appropriations are described for the following agencies: Appalachian Regional Commission, Defense Nuclear Facilities Safety Board, Delaware River Basin Commission, Interstate Commission of the Potomac River Basin, Nuclear Regulatory Commission, Nuclear Waste Technical Review Board, Susquehanna River Basin Commission, and Tennessee Valley Authority

  2. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Misrepresenting the Jordan River Basin

    Directory of Open Access Journals (Sweden)

    Clemens Messerschmid

    2015-06-01

    Full Text Available This article advances a critique of the UN Economic and Social Commission for West Asia’s (ESCWA’s representation of the Jordan River Basin, as contained in its recently published Inventory of Shared Water Resources in Western Asia. We argue that ESCWA’s representation of the Jordan Basin is marked by serious technical errors and a systematic bias in favour of one riparian, Israel, and against the Jordan River’s four Arab riparians. We demonstrate this in relation to ESCWA’s account of the political geography of the Jordan River Basin, which foregrounds Israel and its perspectives and narratives; in relation to hydrology, where Israel’s contribution to the basin is overstated, whilst that of Arab riparians is understated; and in relation to development and abstraction, where Israel’s transformation and use of the basin are underplayed, while Arab impacts are exaggerated. Taken together, this bundle of misrepresentations conveys the impression that it is Israel which is the main contributor to the Jordan River Basin, Arab riparians its chief exploiters. This impression is, we argue, not just false but also surprising, given that the Inventory is in the name of an organisation of Arab states. The evidence discussed here provides a striking illustration of how hegemonic hydro-political narratives are reproduced, including by actors other than basin hegemons themselves.

  4. Nuclear Regulatory Commission issuances, April 1994

    International Nuclear Information System (INIS)

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances, June 1992

    International Nuclear Information System (INIS)

    1992-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances, December 1991

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Defense (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances, May 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances, July 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances, December 1993

    International Nuclear Information System (INIS)

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances, December 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances, September 1992

    International Nuclear Information System (INIS)

    1992-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances, February 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances, March 1993

    International Nuclear Information System (INIS)

    1993-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, July 1993

    International Nuclear Information System (INIS)

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, August 1992

    International Nuclear Information System (INIS)

    1992-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances, August 1991

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances, February 1993

    International Nuclear Information System (INIS)

    1993-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances, November 1992

    International Nuclear Information System (INIS)

    1992-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances, April 1993

    International Nuclear Information System (INIS)

    1993-04-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. The preparation and implementation of the commissioning of Qinshan nuclear power plant

    International Nuclear Information System (INIS)

    Huang Jinyuan

    1993-05-01

    The commissioning test of Qinshan Nuclear Power Plant is summarized. The preparation stage includes the organizations, commissioning programme, network planning, commissioning items, management procedures, responsibilities and interfaces between divisions, products ordering and supplying, personal training, quality assurance and the review and supervision by National Nuclear Safety Administration etc. The implementation stage includes the commissioning programme planning, intermediate hand-over inspection of the system and equipment, inspecting conditions and setting organizations for commissioning, the transition from commissioning to operating. Finally, some experiences in the commissioning test are presented in the article

  2. 28 CFR 2.94 - Supervision reports to Commission.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Supervision reports to Commission. 2.94 Section 2.94 Judicial Administration DEPARTMENT OF JUSTICE PAROLE, RELEASE, SUPERVISION AND RECOMMITMENT OF PRISONERS, YOUTH OFFENDERS, AND JUVENILE DELINQUENTS District of Columbia Code: Prisoners and Parolees § 2.94 Supervision reports to Commissio...

  3. Nuclear Regulatory Commission issuances, May 1982

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission, the Atomic Safety and Licensing Appeal Boards, the Atomic Safety and Licensing Boards, the Administrative Law Judge, the Directors' Decision, and the Denials of Petitions for Rulemaking

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  6. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  7. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  8. Nuclear Regulatory Commission issuances. Volume 47, Number 3

    International Nuclear Information System (INIS)

    1998-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The two issuances included here are: (1) the Commission issuance to the US Enrichment Corporation and (2) the Director's Decision to the North Atlantic Energy Service Corporation

  9. Impact of National Universities Commission (NUC) Accreditation ...

    African Journals Online (AJOL)

    Nekky Umera

    (NUC) accreditation exercise on university administrative structure of four selected Nigerian ... The Commission's recommendations led to the setting up by Government the National ... For instance, the goals of tertiary education as spelt out in ...

  10. 76 FR 55424 - CFC-50 Commission

    Science.gov (United States)

    2011-09-07

    ... conclude its work in approximately six months. 11. Termination. March 31, 2012. 12. Membership and... administrators of the campaign, participating charities and watchdog groups. These members will consist of both... Agency's approval, are responsible for directing the work of the Commission, including the creation of...

  11. Nuclear Regualtory Commission Issuances, October 1981

    International Nuclear Information System (INIS)

    1981-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors Denial (DD), and the Denial of Petitions for Rulemaking

  12. Nuclear Regulatory Commission issuances, July 1988

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission Issuances, October 1986

    International Nuclear Information System (INIS)

    1986-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances, May 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, September 1987

    International Nuclear Information System (INIS)

    1987-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, April 1989

    International Nuclear Information System (INIS)

    1989-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances, July 1989

    International Nuclear Information System (INIS)

    1989-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances, March 1989

    International Nuclear Information System (INIS)

    1989-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances, May 1989

    International Nuclear Information System (INIS)

    1989-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances, May 1990

    International Nuclear Information System (INIS)

    1990-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, August 1990

    International Nuclear Information System (INIS)

    1990-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances, October 1989

    International Nuclear Information System (INIS)

    1989-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances, June 1987

    International Nuclear Information System (INIS)

    1987-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decision (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances, April 1987

    International Nuclear Information System (INIS)

    1987-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission Issuances, August 1986

    International Nuclear Information System (INIS)

    1986-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances, November 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission Issuances, March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances, November 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances, June 1990

    International Nuclear Information System (INIS)

    1990-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances, December 1990

    International Nuclear Information System (INIS)

    1990-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances, December 1989

    International Nuclear Information System (INIS)

    1989-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances, February 1989

    International Nuclear Information System (INIS)

    1989-02-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances, February 1985

    International Nuclear Information System (INIS)

    1985-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances, November 1990

    International Nuclear Information System (INIS)

    1990-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Monitoring Forest Carbon Stocks and Fluxes in the Congo Basin

    OpenAIRE

    2010-01-01

    The Central African Forests Commission (COMIFAC) and its partners (OFAC, USAID, EC-JRC, OSFAC, WWF, WRI, WCS, GOFC-GOLD, START, UN-FAO) organized an international conference on "Monitoring of Carbon stocks and fluxes in the Congo Basin" in Brazzaville, Republic of Congo, 2-4 February 2010. The conference brought together leading international specialists to discuss approaches for quantifying stocks and flows of carbon in tropical forests of the Congo Basin. The conference provided a unique op...

  16. Foundations of the participatory approach in the Mekong River basin management.

    Science.gov (United States)

    Budryte, Paulina; Heldt, Sonja; Denecke, Martin

    2018-05-01

    Integrated Water Resource Management (IWRM) was acknowledged as a leading concept in the water management for the last two decades by academia, political decision-makers and experts. It strongly promotes holistic management and participatory approaches. The flexibility and adaptability of IWRM concept are especially important for large, transboundary river basins - e.g. the Mekong river basin - where natural processes and hazards, as well as, human-made "disasters" are demanding for a comprehensive approach. In the Mekong river basin, the development and especially the enforcement of one common strategy has always been a struggle. The past holds some unsuccessful experiences. In 2016 Mekong River Commission published IWRM-based Basin Development Strategy 2016-2020 and The Mekong River Commission Strategic Plan 2016-2020. They should be the main guiding document for the Mekong river development in the near future. This study analyzes how the concept of public participation resembles the original IWRM participatory approach in these documents. Therefore, IWRM criteria for public participation in international literature and official documents from the Mekong river basin are compared. As there is often a difference between "de jure" and "de facto" implementation of public participation in management concepts, the perception of local stakeholders was assessed in addition. The results of social survey give an insight if local people are aware of Mekong river basin development and present their dominant attitudes about the issue. The findings enable recommendations how to mitigate obstacles in the implementation of common development strategy. Copyright © 2017 Elsevier B.V. All rights reserved.

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety nd Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  18. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services

  19. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  20. Nuclear Regulatory Commission issuances, April 1991

    International Nuclear Information System (INIS)

    1991-04-01

    This report includes the issuances received during the specified period (April 1991) from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. 78 FR 19979 - Establishment of the Presidential Commission on Election Administration

    Science.gov (United States)

    2013-04-03

    ... the Commission, but shall be allowed travel expenses, including per diem in lieu of subsistence, to... proposals. (e) This order is not intended to, and does not, create any right or benefit, substantive or..., or entities, its officers, employees, or agents, or any other person. (Presidential Sig.) THE WHITE...

  2. Nuclear Regulatory Commission issuances, Volume 47, No. 1

    International Nuclear Information System (INIS)

    1998-01-01

    This report includes the issuances received during the specified period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking

  3. Problems arising in connection with the commissioning of experts in conflict-oriented implementation of nuclear law. The legal status of expert opinions in administrative procedures under the Atomic Energy Act

    International Nuclear Information System (INIS)

    Fiebig, T.H.

    1995-01-01

    Court decisions available so far do not primarily consider the problems linked to the commissioning of an expert and his mandate, as well as the legal status of the commissioning of an expert as an administrative act which might be legally contestable. Thus there are at present no court decisions that would create legal certainty in matters of the act of commissioning a nuclear expert opinion. The current legal situation is such that an independent order for commissioning of an expert opinion in compliance with section 19 III AtG (Atomic Energy Act), which in general is given in response to the refusal of the facility operator to do so, can be independently contested on the basis of section 44 a, sentence 2 VwGO (Rules of Administrative Courts). The current practice of conflict-oriented, or nuclear power phase-out-oriented, implementation of the nuclear law poses a threat to our constitutional state and to our democracy. The supply of energy as a common good is of essential importance and thus deserves fair and objective treatment free of emotions, including the matter of nuclear energy. In cases of nuclear licensing procedures meeting with impedimental treatment by a Land government favouring the nuclear power phase-out, this treatment however not fitting into the Land governments' overall political line, there is reason to call upon the Federal Government to take action for clarifying the situation. (orig./HP) [de

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  5. Basin and Range Province, Western US, USGS Grids #2

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — These grid files were used to produce gravity and basin depth maps of the Basin and Range Province, western United States. The maps show gravity values and modeled...

  6. Basin and Range Province, Western US, USGS Grids, #1

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — These grid files were used to produce gravity and basin depth maps of the Basin and Range Province, western United States. The maps show gravity values and modeled...

  7. Basin and Range Province, Western US, USGS Grids #3

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — These grid files were used to produce gravity and basin depth maps of the Basin and Range Province, western United States. The maps show gravity values and modeled...

  8. Basin and Range Province, Western US, USGS Grids #5

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — These grid files were used to produce gravity and basin depth maps of the Basin and Range Province, western United States. The maps show gravity values and modeled...

  9. Basin and Range Province, Western US, USGS Grids #4

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — These grid files were used to produce gravity and basin depth maps of the Basin and Range Province, western United States. The maps show gravity values and modeled...

  10. Nuclear Regulatory Commission issuance, pages 933-1089

    International Nuclear Information System (INIS)

    1981-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors Denial (DD), and the Denial of Petitions for Rulemaking

  11. 16 CFR 1031.6 - Extent and form of Commission involvement in the development of voluntary standards.

    Science.gov (United States)

    2010-01-01

    ..., engineering support, and information and education programs) and administrative assistance (e.g., travel costs... SAFETY COMMISSION GENERAL COMMISSION PARTICIPATION AND COMMISSION EMPLOYEE INVOLVEMENT IN VOLUNTARY... goals and objectives with regard to voluntary standards and improved consumer product safety; responding...

  12. 76 FR 30950 - Advisory Commission on Childhood Vaccines; Notice of Meeting

    Science.gov (United States)

    2011-05-27

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Health Resources and Services Administration Advisory Commission on Childhood Vaccines; Notice of Meeting AGENCY: Health Resources and Services Administration, HHS... Childhood Vaccines, June 9- 10, 2011, in the Parklawn Building (and via audio conference call), Conference...

  13. Traffic legislation and safety in Europe concerning the moped and the A1 category (125 cc) motorcycle : a literature and questionnaire study commissioned by the Swedish National Road Administration

    NARCIS (Netherlands)

    Schoon, C.C.

    2004-01-01

    A study, commissioned by the Swedish National Road Administration, of the safety aspects of mopeds and the light motorcycle A1 category (max. 125 cc) has been carried out. The study consists of a comparison of European countries. An important part of the information was gathered using questionnaires

  14. 77 FR 25678 - International Trade Administration

    Science.gov (United States)

    2012-05-01

    ... DEPARTMENT OF COMMERCE International Trade Administration Antidumping or Countervailing Duty Order..., International Trade Administration, Department of Commerce. Background Every five years, pursuant to section 751...'') and the International Trade Commission automatically initiate and conduct a review to determine...

  15. 75 FR 14401 - Amendment of Certain of the Commission's Rules of Practice and Procedure and Rules of Commission...

    Science.gov (United States)

    2010-03-25

    ... nature, notice and comment is not required under the Administrative Procedure Act. 5 U.S.C. 553(b)(A... discussed below, however, our goal is to increase the use of electronic filing of pleadings in the future... ECFS. Pleadings filed electronically through the Commission's Universal Licensing System (ULS), for...

  16. Nuclear Regulatory commission issuances, Volume 42, No. 5

    International Nuclear Information System (INIS)

    1995-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances. Volume 42, No. 6

    International Nuclear Information System (INIS)

    1995-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances, Volume 45, No. 2

    International Nuclear Information System (INIS)

    1997-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances. Volume 42, No. 4

    International Nuclear Information System (INIS)

    1995-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances. Volume 42, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  1. Nuclear Regulatory Commission issuances. Volume 38, No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  2. Federal Trade Commission's authority to regulate marketing to children: deceptive vs. unfair rulemaking.

    Science.gov (United States)

    Pomeranz, Jennifer L

    2011-01-01

    Food and beverage marketing directed at children is of increasing concern to the public health and legal communities. The new administration at the Federal Trade Commission and abundant science on the topic make it a particularly opportune time for the government to reconsider regulating marketing directed at youth. This Article analyzes the Commission's authority to regulate food and beverage marketing directed at children under its jurisdiction over unfair and deceptive acts and practices to determine which avenue is most viable. The author finds that the Federal Trade Commission has the authority to regulate deceptive marketing practices directed at vulnerable populations. Although the Commission can issue individual orders, its remedial power to initiate rules would better address the pervasiveness of modern marketing practices. The Commission does not currently have the power to regulate unfair marketing to children; however, even if Congress reinstated this authority, the Commission's authority over deceptive marketing may be preferable to regulate these practices. Deceptive communications are not protected by the First Amendment and the deceptive standard matches the science associated with marketing to children. The Federal Trade Commission has the authority to initiate rulemaking in the realm of food and beverage marketing to children as deceptive communications in interstate commerce, in violation of the Federal Trade Commission Act. However, to effectuate this process, Congress would need to grant the Commission the authority to do so under the Administrative Procedures Act.

  3. 17 CFR 140.20 - Designation of senior official to oversee Commission use of national security information.

    Science.gov (United States)

    2010-04-01

    ... to oversee Commission use of national security information. 140.20 Section 140.20 Commodity and... safeguarding of national security information received by the Commission from other agencies, to chair a... suggestions and complaints with respect to the Commission administration of its information security program...

  4. Nuclear Regulatory Commission issuances, May 1993

    International Nuclear Information System (INIS)

    1993-05-01

    This report contains the issuances received during the specified period (May 1993) from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not deemed a part of these opinions or have any independent legal significance. Contents of this document include an Issuance of the Nuclear Regulatory Commission with respect to the Sacramento Municipal Utility District and Issuances of Directors' Decisions concerning the Interstate Nuclear Service Corporation; Niagara Mohawk Power Corporation; and Texas Utilities Electric Company, et al. and All Nuclear Power Plants with Thermo-Lag Fire Barriers

  5. Nuclear Regulatory Commission issuances, Volume 18, No. 5

    International Nuclear Information System (INIS)

    1983-11-01

    This report includes the issuances received during November, 1983, from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission Issuances. Volume 22, No. 1

    International Nuclear Information System (INIS)

    1985-07-01

    This report includes the issuances received during July 1985 from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances. Volume 22, No. 5

    International Nuclear Information System (INIS)

    1985-11-01

    This report includes the issuances received during November 1985 from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. 39 CFR 3002.11 - Administrative Office.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Administrative Office. 3002.11 Section 3002.11 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION § 3002.11 Administrative Office. (a) The incumbent head of the office is responsible for exercising two executive functions of the...

  9. 77 FR 65099 - Use of the Centennial of Flight Commission Name; Correction

    Science.gov (United States)

    2012-10-25

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 14 CFR Part 1204 [Docket No. NASA-2012-0004] RIN 2700-AD78 Use of the Centennial of Flight Commission Name; Correction AGENCY: National Aeronautics and Space Administration. ACTION: Direct final rule; correction. SUMMARY: This document corrects a direct...

  10. 78 FR 79481 - Summary of Commission Practice Relating to Administrative Protective Orders

    Science.gov (United States)

    2013-12-30

    ... economist or consultant to obtain access to BPI/CBI under the APO in a title VII or safeguard investigation if the economist or consultant is under the direction and control of an attorney under the APO, or if the economist or consultant appears regularly before the Commission and represents an interested party...

  11. Predicted channel types - Potential for Habitat Improvement in the Columbia River Basin

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Basin-wide analysis of potential to improve tributary habitats in the Columbia River basin through restoration of habitat-forming processes. Identification of...

  12. Predicted riparian vegetation - Potential for Habitat Improvement in the Columbia River Basin

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Basin-wide analysis of potential to improve tributary habitats in the Columbia River basin through restoration of habitat-forming processes. Identification of...

  13. Nuclear Regulatory Commission issuances. Vol. 16, No. 5

    International Nuclear Information System (INIS)

    1982-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances. Volume 17, No. 4

    International Nuclear Information System (INIS)

    1983-04-01

    This report includes the issuances received during the specified period from the Commission (CLi), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission Issuances. Volume 23, No. 1

    International Nuclear Information System (INIS)

    1986-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances. Volume 20, No. 4

    International Nuclear Information System (INIS)

    1984-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances. Volume 22, No. 6

    International Nuclear Information System (INIS)

    1985-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances. Volume 20, No. 2

    International Nuclear Information System (INIS)

    1984-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances. Volume 21, No. 6

    International Nuclear Information System (INIS)

    1985-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances. Volume 21, No. 5

    International Nuclear Information System (INIS)

    1985-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances. Vol. 16, No. 4

    International Nuclear Information System (INIS)

    1982-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances. Vol. 16, No. 1

    International Nuclear Information System (INIS)

    1982-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM)

  3. Nuclear Regulatory Commission Issuances. Volume 23, No. 2

    International Nuclear Information System (INIS)

    1986-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  5. Indexes to Nuclear Regulatory Commission issuances, January-March 1987

    International Nuclear Information System (INIS)

    1987-09-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Appeal Panel, the Atomic Safety and Licensing Board Panel, the Administrative Law Judge, the Directors' Decisions, and the Denials of Petitions of Rulemaking are presented in this document

  6. 47 CFR 15.715 - TV bands database administrator.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false TV bands database administrator. 15.715 Section... Band Devices § 15.715 TV bands database administrator. The Commission will designate one or more entities to administer a TV bands database. Each database administrator shall: (a) Maintain a database that...

  7. Regional and International Networking to Support the Energy Regulatory Commission of Thailand

    Energy Technology Data Exchange (ETDEWEB)

    Lavansiri, Direk; Bull, Trevor

    2010-09-15

    The Energy Regulatory Commission of Thailand is a new regulatory agency. The structure of the energy sector; the tradition of administration; and, the lack of access to experienced personnel in Thailand all pose particular challenges. The Commission is meeting these challenges through regional and international networking to assist in developing policies and procedures that allow it to meet international benchmarks.

  8. Indexes to Nuclear Regulatory Commission issuances, July--September 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This digest and index lists the Nuclear Regulatory Commission (NRC) issuances for July to September 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. There are five sections to this index: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index. The digest provides a brief narrative of the issue, including the resolution of the issue and any legal references used for resolution

  9. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Hydroelectric power... BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power Water Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of...

  10. 76 FR 3600 - Codex Alimentarius Commission: Meeting of the Codex Committee on Food Additives

    Science.gov (United States)

    2011-01-20

    ... Alimentarius Commission: Meeting of the Codex Committee on Food Additives AGENCY: Office of the Under Secretary... Administration (FDA), U.S. Department of Health and Human Services, are sponsoring a public meeting on February... of the Codex Committee on Food Additives (CCFA) of the Codex Alimentarius Commission (Codex), which...

  11. 77 FR 5483 - Codex Alimentarius Commission: Meeting of the Codex Committee on Food Additives

    Science.gov (United States)

    2012-02-03

    ... Alimentarius Commission: Meeting of the Codex Committee on Food Additives AGENCY: Office of the Under Secretary... Administration (FDA), U.S. Department of Health and Human Services, are sponsoring a public meeting on February... of the Codex Committee on Food Additives (CCFA) of the Codex Alimentarius Commission (Codex), which...

  12. Indexes to Nuclear Regulatory Commission issuances, January--March 1996

    International Nuclear Information System (INIS)

    1996-01-01

    This publication is the 1st quarter 1996 index to issuances by the US NRC. These include issuances by the Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking

  13. Toward a Holistic and Risk-Based Management of European River Basins

    NARCIS (Netherlands)

    Brack, W.; Apitz, S.E.; Borchardt, D.; Brils, J.; Cardos, A.C.; Foekema, E.M.; Verdonschot, P.F.M.

    2009-01-01

    EDITOR'S NOTE: This is 1 of 12 papers prepared by participants attending the workshop ¿Risk Assessment in European River Basins¿State of the Art and Future Challenges¿ held in Liepzig, Germany on 12¿14 November 2007. The meeting was organized within the framework of the European Commission's

  14. 18 CFR 401.0 - Introduction.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Introduction. 401.0 Section 401.0 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE § 401.0 Introduction. (a) The Delaware River Basin Compact...

  15. 18 CFR 420.41 - Schedule of water charges.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Schedule of water charges. 420.41 Section 420.41 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Charges; Exemptions § 420.41 Schedule of water...

  16. 18 CFR 420.44 - Cooling water.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Cooling water. 420.44 Section 420.44 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Charges; Exemptions § 420.44 Cooling water. Water used...

  17. Nuclear Regulatory Commission issuances, March 1995. Volume 41, No. 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  18. Nuclear Regulatory Commission issuances, May 1995. Volume 41, No. 5

    International Nuclear Information System (INIS)

    1995-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances, March 1995. Volume 41, No. 3

    International Nuclear Information System (INIS)

    1995-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances, May 1995. Volume 41, No. 5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  1. Nuclear Regulatory Commission issuances, April 1994. Volume 39, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  2. Nuclear Regulatory Commission issuances, December 1994. Volume 40, No. 6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  3. Nuclear Regulatory Commission issuances, September 1994. Volume 40, No. 3

    International Nuclear Information System (INIS)

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances, February 1996: Volume 43, No. 2

    International Nuclear Information System (INIS)

    1996-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances, February 1996: Volume 43, No. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  6. Nuclear Regulatory Commission issuances, September 1988

    International Nuclear Information System (INIS)

    1988-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  7. Indexes to Nuclear Regulatory Commission issuances, January--March 1989

    International Nuclear Information System (INIS)

    1989-07-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document

  8. Nuclear Regulatory Commission issuances. Volume 47, Number 2

    International Nuclear Information System (INIS)

    1998-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). They involve: 21st Century Technologies, Inc.; Hydro Resources, Inc.; Northeast Utilities; and Northern States Power Company

  9. 16 CFR 0.14 - Office of Administrative Law Judges.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Office of Administrative Law Judges. 0.14 Section 0.14 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ORGANIZATION § 0.14 Office of Administrative Law Judges. Administrative law judges are officials to whom the...

  10. 2010 Administrative Law Judge Initial Decisions

    Data.gov (United States)

    Securities and Exchange Commission — The initial decisions issued by administrative law judges in 2010 that contains findings of fact, legal conclusions, and an order that often contains a sanction....

  11. 2009 Administrative Law Judge Initial Decisions

    Data.gov (United States)

    Securities and Exchange Commission — The initial decisions issued by administrative law judges in 2009 that contains findings of fact, legal conclusions, and an order that often contains a sanction....

  12. 29 CFR 2704.307 - Decision of administrative law judge.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Decision of administrative law judge. 2704.307 Section 2704.307 Labor Regulations Relating to Labor (Continued) FEDERAL MINE SAFETY AND HEALTH REVIEW COMMISSION IMPLEMENTATION OF THE EQUAL ACCESS TO JUSTICE ACT IN COMMISSION PROCEEDINGS Procedures for Considering...

  13. 18 CFR 415.1 - Short title.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Short title. 415.1 Section 415.1 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-FLOOD PLAIN REGULATIONS Generally § 415.1 Short title. This part shall be known...

  14. Indexes to Nuclear Regulatory Commission issuances, January--March 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    This document provides digests and indexes for issuances of the Nuclear Regulatory Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors Decisions, and the Decisions on Petitions for Rulemaking. These indexes and digests are intended to serve as a guide to the issuances.

  15. Indexes to Nuclear Regulatory Commission issuances, January--March 1997

    International Nuclear Information System (INIS)

    1997-01-01

    This document provides digests and indexes for issuances of the Nuclear Regulatory Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors Decisions, and the Decisions on Petitions for Rulemaking. These indexes and digests are intended to serve as a guide to the issuances

  16. New Orleans Regional Planning Commission scenario planning workshop : sponsored by the Federal Highway Administration

    Science.gov (United States)

    2016-05-01

    This report summarizes noteworthy practices and key recommendations shared during a scenario planning workshop, hosted by the New Orleans Regional Planning Commission, on August 12-13, 2015, in New Orleans, Louisiana. The Federal Highway Administrati...

  17. Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1 - December 31, 1996. Volume 44, Pages 1 - 432

    International Nuclear Information System (INIS)

    1997-01-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors' Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM

  18. Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1--December 31, 1996. Volume 44, Pages 1--432

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors` Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM.

  19. 77 FR 71711 - Commission's Rules Regarding the Office of Managing Director and the Office of Inspector General

    Science.gov (United States)

    2012-12-04

    ...In this document, the Federal Communications Commission (Commission) amends its rules to reassign to the Office of Managing Director (OMD) certain audit activities formerly assigned to the Office of Inspector General (OIG). The activities concern oversight of the annual audit of the Universal Service Administrative Corporation (USAC) required by the Commission's rules. In addition, the Commission delegates of authority to OMD, in consultation with the Office of General Counsel, to issue subpoenas concerning matters within its jurisdiction.

  20. 2009-2012 Indiana Statewide Imagery and LiDAR Program: Maumee River Basin Counties

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The counties comprised in this dataset have been chosen based on the relation to the Maumee River basin, a portion of the Lake Erie basin and correlated with the...

  1. Views of NHS commissioners on commissioning support provision. Evidence from a qualitative study examining the early development of clinical commissioning groups in England.

    Science.gov (United States)

    Petsoulas, Christina; Allen, Pauline; Checkland, Kath; Coleman, Anna; Segar, Julia; Peckham, Stephen; Mcdermott, Imelda

    2014-10-15

    The 2010 healthcare reform in England introduced primary care-led commissioning in the National Health Service (NHS) by establishing clinical commissioning groups (CCGs). A key factor for the success of the reform is the provision of excellent commissioning support services to CCGs. The Government's aim is to create a vibrant market of competing providers of such services (from both for-profit and not-for-profit sectors). Until this market develops, however, commissioning support units (CSUs) have been created from which CCGs are buying commissioning support functions. This study explored the attitudes of CCGs towards outsourcing commissioning support functions during the initial stage of the reform. The research took place between September 2011 and June 2012. We used a case study research design in eight CCGs, conducting in-depth interviews, observation of meetings and analysis of policy documents. We conducted 96 interviews and observed 146 meetings (a total of approximately 439 h). Many CCGs were reluctant to outsource core commissioning support functions (such as contracting) for fear of losing local knowledge and trusted relationships. Others were disappointed by the absence of choice and saw CSUs as monopolies and a recreation of the abolished PCTs. Many expressed doubts about the expectation that outsourcing of commissioning support functions will result in lower administrative costs. Given the nature of healthcare commissioning, outsourcing vital commissioning support functions may not be the preferred option of CCGs. Considerations of high transaction costs, and the risk of fragmentation of services and loss of trusted relationships involved in short-term contracting, may lead most CCGs to decide to form long-term partnerships with commissioning support suppliers in the future. This option, however, limits competition by creating 'network closure' and calls into question the Government's intention to create a vibrant market of commissioning support

  2. StreamNet; Northwest Aquatic Resource Information Network - Status of Salmon and Steelhead in the Columbia River Basin, 1995 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Duane A.; Beamesderfer, Raymond C. [Oregon Dept. of Fish and Wildlife, Enterprise, OR (United States); Woodard, Bob [Washington Dept. of Fish and Wildlife, Olympia, WA (United States)

    1996-04-01

    Information on fish populations, fisheries, and fish habitat is crucial to the success of ongoing program to protect, recover, enhance, and manage fish resources in the Columbia River Basin. However, pertinent data are often difficult to locate because it is scattered among many agencies and is often unpublished. The goal of this annual report is to bring many diverse data types and sources into a single comprehensive report on the status of anadromous fish runs in the Columbia River Basin and the environmental conditions that may affect that status. Brief summaries are provided to identify the type and scope of available information. This synopsis is intended to complement other more detailed reports to which readers are referred for comprehensive treatment of specific subjects. This first report focuses mainly on anadromous salmon and steelhead (primarily through 1994) but the authors intend to expand the scope of future issues to include resident species. This is the first of what the authors intend to be an annual report. They welcome constructive suggestions for improvements. This report is a product of the StreamNet (formerly Coordinated Information System and Northwest Environmental Data Base) project which is a part of the Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The project is called for in the Fish and Wildlife Program of the Northwest Power Planning Council. The project`s objective is to promote exchange and dissemination of information in a standardized electronic format throughout the basin. This project is administered by the Pacific States Marine Fisheries Commission with active participation by tribal, state, and federal fish and wildlife agencies.

  3. ROSETTA-ORBITER CHECK GIADA 2 CVP1 COMMISSIONING1 V1.0

    Data.gov (United States)

    National Aeronautics and Space Administration — This volume contains Experiment Data acquired by GIADA during 'Commissioning 1' phase. More in detail it refers to the data provided during the following in-flight...

  4. ROSETTA-ORBITER CHECK GIADA 2 CVP2 COMMISSIONING2 V1.0

    Data.gov (United States)

    National Aeronautics and Space Administration — This volume contains Experiment Data acquired by GIADA during 'Commissioning 2' phase. More in detail it refers to the data provided during the following in-flight...

  5. Nuclear Regulatory Commission Issuances. Volume 42, No. 1, Pages 1--45

    International Nuclear Information System (INIS)

    1995-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  6. Indexes to Nuclear Regulatory Commission Issuances, January--June 1994

    International Nuclear Information System (INIS)

    1994-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  7. Nuclear Regulatory Commission issuances: Volume 46, Number 6

    International Nuclear Information System (INIS)

    1997-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decision (DD), and the Decision on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  8. Nuclear Regulatory Commission issuances. Volume 46, Number 1

    International Nuclear Information System (INIS)

    1997-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  9. Nuclear Regulatory Commission issuances: Volume 46, Number 6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decision (DD), and the Decision on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  10. Nuclear Regulatory Commission issuances, Volume 45, No. 5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  11. Nuclear Regulatory Commission issuances. Volume 46, Number 2

    International Nuclear Information System (INIS)

    1997-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  12. Nuclear Regulatory Commission issuances, Volume 45, No. 5

    International Nuclear Information System (INIS)

    1997-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  13. Indexes to Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index

  14. Indexes to Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

  15. Nuclear Regulatory Commission issuances, April 1986. Volume 23, No. 4

    International Nuclear Information System (INIS)

    1986-04-01

    This report includes the issuances recieved during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, December 1982. Vol. 16, No. 6

    International Nuclear Information System (INIS)

    1982-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances, June 1986. Volume 23, No. 6

    International Nuclear Information System (INIS)

    1986-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. A functional model for simulator based training in the pacific basin

    International Nuclear Information System (INIS)

    Lam, K.; MacBeth, M.J.

    1998-01-01

    According to expert estimate, the nuclear power installed capacity in the Pacific Basin region may reach 20 GWe by the year 2010. Facing a phenomenal growth in nuclear power development in the region, the development of high quality nuclear human resources for 'nuclear power ready' developing countries in the Pacific Basin is an important issue at this time. This paper recommends a timely and cost-effective functional training model to the Pacific Basin countries. The model utilizes high quality simulation executed on low cost and readily available PCs to deliver desktop simulator based training programs, as an efficient and economical complement to full scope simulators, which may not be available for initial training until five years after the NPP project has started. The objective is to ensure the goals of self-reliance and the transfer of necessary NPP knowledge at the onset of the project, to build up a technological infrastructure in areas vital for subsequent technical support of the NPP in design, commissioning, and operator training: comprehension of control systems; familiarization of plant responses to accident conditions; man machine interface (MMI) functions and interactions; early guide to commissioning and operating procedures; presentation to safety reviewers, etc. An example of this model is demonstrated with the use of the (1) CANDU 9 (CANada Deuterium Uranium 900 MW Pressurized Heavy Water Reactor) desktop nuclear simulator and (2) CASSIM (CASsiopeia SIMulation development system). (author)

  19. Indexes to Nuclear Regulatory Commission issuances, July-September 1983

    International Nuclear Information System (INIS)

    1983-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as guide to the issuances

  20. Structural safety evaluation of the K Basin railcar and truck applications

    International Nuclear Information System (INIS)

    Winkel, B.V.

    1995-08-01

    There are two rail spurs in the storage/transfer areas of both the K East and K West fuel storage basins. These rail spurs both end at the west edge of the basins. To avoid accidental entry of a railcar into a basin, administrative procedures and rail control hardware have been provided. Based upon a combination of historical documentation and existing adminstrative controls, a maximum credible impact accident was established. Using this design basis accident, the existing rail control hardware was evaluated for structural adequacy. The K Basin rail spurs are embedded in concrete, which permits truck/trailer entry into the same area. Safety issues for truck applications are also addressed

  1. Estimate of the Geothermal Energy Resource in the Major Sedimentary Basins in the United States (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Esposito, A.; Porro, C.; Augustine, C.; Roberts, B.

    2012-09-01

    Because most sedimentary basins have been explored for oil and gas, well logs, temperatures at depth, and reservoir properties such as depth to basement and formation thickness are well known. The availability of this data reduces exploration risk and allows development of geologic exploration models for each basin. This study estimates the magnitude of recoverable geothermal energy from 15 major known U.S. sedimentary basins and ranks these basins relative to their potential. The total available thermal resource for each basin was estimated using the volumetric heat-in-place method originally proposed by (Muffler, 1979). A qualitative recovery factor was determined for each basin based on data on flow volume, hydrothermal recharge, and vertical and horizontal permeability. Total sedimentary thickness maps, stratigraphic columns, cross sections, and temperature gradient information was gathered for each basin from published articles, USGS reports, and state geological survey reports. When published data were insufficient, thermal gradients and reservoir properties were derived from oil and gas well logs obtained on oil and gas commission databases. Basin stratigraphy, structural history, and groundwater circulation patterns were studied in order to develop a model that estimates resource size, temperature distribution, and a probable quantitative recovery factor.

  2. 78 FR 55254 - Information Collection Being Reviewed by the Federal Communications Commission Under Delegated...

    Science.gov (United States)

    2013-09-10

    ... unfairly disadvantage the other bidders in the market by creating an asymmetry of information. Section 1... warranted, referred to the Commission's Enforcement Bureau for possible investigation and administrative...

  3. Nuclear Regulatory Commission issuances: Volume 39, Number 6

    International Nuclear Information System (INIS)

    1994-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). Issuances of the Nuclear Regulatory Commission include: (1) Advanced Medical Systems, Inc.; (2) Henry Allen, Diane Marrone, and Susan Settino; and (3) Westinghouse Electric Corporation. Issuances of the Atomic Safety and Licensing Boards include: (1) Sequoyah Fuels Corporation and General Atomics Corporation and (2) Umetco Minerals Corporation. Issuances of Director's Decisions include: (1) Advanced Medical Systems, Inc., and (2) Boston Edison Company and all boiling water reactors. The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  4. HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

    International Nuclear Information System (INIS)

    Evans, S. K.

    2007-01-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve 'clean closure' of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems

  5. HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Evans, S. K.

    2007-11-07

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve "clean closure" of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems.

  6. Federal radiation initiatives wane in Reagan administration

    International Nuclear Information System (INIS)

    Linton, O.W.

    1981-01-01

    A series of administrative initiatives undertaken by the Carter Administration in response to public concerns about harmful effects of exposures to ionizing radiation in various settings has been abandoned by the Reagan Administration. The decision to discard the Radiation Policy Council, the coordinating agency established in 1980, leaves the federal government with no overall focus or overall budget for radiation research and protection activities. The line agencies with direct radiation responsibilities, including the Department of Energy, Nuclear Regulatory Commission, Department of Defense, Food and Drug Administration's Bureau of Radiological health, and Department of Labor, continue with somewhat contradictory and uncoordinated programs

  7. Indexes to Nuclear Regulatory Commission issuances, January-June 1987

    International Nuclear Information System (INIS)

    1988-02-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  8. Indexes to Nuclear Regulatory Commission issuances, July-December 1986

    International Nuclear Information System (INIS)

    1987-07-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  9. Indexes to Nuclear Regulatory Commission issuances, July-September 1986

    International Nuclear Information System (INIS)

    1987-06-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  10. Indexes to Nuclear Regulatory Commission issuances, July-December 1987

    International Nuclear Information System (INIS)

    1988-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  11. Indexes to Nuclear Regulatory Commission issuances, January-June 1982

    International Nuclear Information System (INIS)

    1982-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  12. Indexes to Nuclear Regulatory Commission issuances, July--December 1989

    International Nuclear Information System (INIS)

    1990-05-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  13. Nuclear Regulatory Commission Issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders: July 1, 1992--December 31, 1992, Volume 36, Pages 1--396

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.

  14. Usage and administration manual for a geodatabase compendium of water-resources data-Rio Grande Basin from the Rio Arriba-Sandoval County line, New Mexico, to Presidio, Texas, 1889-2009

    Science.gov (United States)

    Burley, Thomas E.

    2011-01-01

    The U.S. Geological Survey, in cooperation with the New Mexico Interstate Stream Commission, developed a geodatabase compendium (hereinafter referred to as the 'geodatabase') of available water-resources data for the reach of the Rio Grande from Rio Arriba-Sandoval County line, New Mexico, to Presidio, Texas. Since 1889, a wealth of water-resources data has been collected in the Rio Grande Basin from Rio Arriba-Sandoval County line, New Mexico, to Presidio, Texas, for a variety of purposes. Collecting agencies, researchers, and organizations have included the U.S. Geological Survey, Bureau of Reclamation, International Boundary and Water Commission, State agencies, irrigation districts, municipal water utilities, universities, and other entities. About 1,750 data records were recently (2010) evaluated to enhance their usability by compiling them into a single geospatial relational database (geodatabase). This report is intended as a user's manual and administration guide for the geodatabase. All data available, including water quality, water level, and discharge data (both instantaneous and daily) from January 1, 1889, through December 17, 2009, were compiled for the study area. A flexible and efficient geodatabase design was used, enhancing the ability of the geodatabase to handle data from diverse sources and helping to ensure sustainability of the geodatabase with long-term maintenance. Geodatabase tables include daily data values, site locations and information, sample event information, and parameters, as well as data sources and collecting agencies. The end products of this effort are a comprehensive water-resources geodatabase that enables the visualization of primary sampling sites for surface discharges, groundwater elevations, and water-quality and associated data for the study area. In addition, repeatable data processing scripts, Structured Query Language queries for loading prepared data sources, and a detailed process for refreshing all data in the

  15. Streamflow distribution maps for the Cannon River drainage basin, southeast Minnesota, and the St. Louis River drainage basin, northeast Minnesota

    Science.gov (United States)

    Smith, Erik A.; Sanocki, Chris A.; Lorenz, David L.; Jacobsen, Katrin E.

    2017-12-27

    Streamflow distribution maps for the Cannon River and St. Louis River drainage basins were developed by the U.S. Geological Survey, in cooperation with the Legislative-Citizen Commission on Minnesota Resources, to illustrate relative and cumulative streamflow distributions. The Cannon River was selected to provide baseline data to assess the effects of potential surficial sand mining, and the St. Louis River was selected to determine the effects of ongoing Mesabi Iron Range mining. Each drainage basin (Cannon, St. Louis) was subdivided into nested drainage basins: the Cannon River was subdivided into 152 nested drainage basins, and the St. Louis River was subdivided into 353 nested drainage basins. For each smaller drainage basin, the estimated volumes of groundwater discharge (as base flow) and surface runoff flowing into all surface-water features were displayed under the following conditions: (1) extreme low-flow conditions, comparable to an exceedance-probability quantile of 0.95; (2) low-flow conditions, comparable to an exceedance-probability quantile of 0.90; (3) a median condition, comparable to an exceedance-probability quantile of 0.50; and (4) a high-flow condition, comparable to an exceedance-probability quantile of 0.02.Streamflow distribution maps were developed using flow-duration curve exceedance-probability quantiles in conjunction with Soil-Water-Balance model outputs; both the flow-duration curve and Soil-Water-Balance models were built upon previously published U.S. Geological Survey reports. The selected streamflow distribution maps provide a proactive water management tool for State cooperators by illustrating flow rates during a range of hydraulic conditions. Furthermore, after the nested drainage basins are highlighted in terms of surface-water flows, the streamflows can be evaluated in the context of meeting specific ecological flows under different flow regimes and potentially assist with decisions regarding groundwater and surface

  16. 11 CFR 9007.7 - Administrative record.

    Science.gov (United States)

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Administrative record. 9007.7 Section 9007.7 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: GENERAL ELECTION... properly subject to privileges such as an attorney-client privilege, or items constituting attorney work...

  17. Nuclear Regulatory Commission issuances. Volume 22, No. 4

    International Nuclear Information System (INIS)

    1985-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  18. Nuclear Regulatory Commission issuances: June 1995. Volume 41, Number 6

    International Nuclear Information System (INIS)

    1995-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM). This report contains four issuances by the CLI, 5 issuances by the LBP, and 1 issuance by the DD

  19. Nuclear Regulatory Commission issuances: June 1995. Volume 41, Number 6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM). This report contains four issuances by the CLI, 5 issuances by the LBP, and 1 issuance by the DD.

  20. Near real time water resources data for river basin management

    Science.gov (United States)

    Paulson, R. W. (Principal Investigator)

    1973-01-01

    The author has identified the following significant results. Twenty Data Collection Platforms (DCP) are being field installed on USGS water resources stations in the Delaware River Basin. DCP's have been successfully installed and are operating well on five stream gaging stations, three observation wells, and one water quality monitor in the basin. DCP's have been installed at nine additional water quality monitors, and work is progressing on interfacing the platforms to the monitors. ERTS-related water resources data from the platforms are being provided in near real time, by the Goddard Space Flight Center to the Pennsylvania district, Water Resources Division, U.S. Geological Survey. On a daily basis, the data are computer processed by the Survey and provided to the Delaware River Basin Commission. Each daily summary contains data that were relayed during 4 or 5 of the 15 orbits made by ERTS-1 during the previous day. Water resources parameters relays by the platforms include dissolved oxygen concentrations, temperature, pH, specific conductance, well level, and stream gage height, which is used to compute stream flow for the daily summary.

  1. Geographical Information Systems for International River Basin Management in the Third World

    Energy Technology Data Exchange (ETDEWEB)

    Kammerud, Terje Andre

    1998-12-31

    This thesis discusses implementation and application of Geographical Information systems (GIS) in international River Basin Organizations (RBOs) in the Third World. Third World countries sharing the same river basin are increasingly experiencing conflicts because they exploit the same water resource. Empirical knowledge is derived from two case studies. (1) The Mekong River Commission Secretariat`s experiences in applying GIS are investigated. The conditions assessed are related to institutional, funding, expertise, training and technology issues for successful application of GIS. (2) The prospects for the implementation of GIS at a future WATERNET Centre in Amman are investigated. Israel, Jordan and the Palestinian Authority have decided to establish a regional GIS Centre in the lower Jordan River Basin. The study assesses political, legal and institutional conditions for the successful implementation of GIS. It is concluded that implementing and applying GIS successfully in RBOs in the Third World is challenging, although not for technological reasons. 265 refs., 28 figs., 13 tabs.

  2. Geographical Information Systems for International River Basin Management in the Third World

    Energy Technology Data Exchange (ETDEWEB)

    Kammerud, Terje Andre

    1997-12-31

    This thesis discusses implementation and application of Geographical Information systems (GIS) in international River Basin Organizations (RBOs) in the Third World. Third World countries sharing the same river basin are increasingly experiencing conflicts because they exploit the same water resource. Empirical knowledge is derived from two case studies. (1) The Mekong River Commission Secretariat`s experiences in applying GIS are investigated. The conditions assessed are related to institutional, funding, expertise, training and technology issues for successful application of GIS. (2) The prospects for the implementation of GIS at a future WATERNET Centre in Amman are investigated. Israel, Jordan and the Palestinian Authority have decided to establish a regional GIS Centre in the lower Jordan River Basin. The study assesses political, legal and institutional conditions for the successful implementation of GIS. It is concluded that implementing and applying GIS successfully in RBOs in the Third World is challenging, although not for technological reasons. 265 refs., 28 figs., 13 tabs.

  3. Indexes to Nuclear Regulatory Commission issuances, January--March 1994. Volume 39, Index 1

    International Nuclear Information System (INIS)

    1994-07-01

    Digests and indexes for issuances of the Commission, Atomic Safety and Licensing Board Panel, Administrative Law Judges, Directors' Decisions, and Denials of Petitions for Rulemaking are presented in this document. They are intended to serve as a guide to the issuances

  4. 76 FR 52969 - In the Matter of Certain Protective Cases and Components Thereof Notice of Commission...

    Science.gov (United States)

    2011-08-24

    .... International Trade Commission has determined not to review the presiding administrative law judge's (``ALJ... named twenty nine respondents, including Cellaris Franchise, Inc. of Alpharetta, Georgia (``Cellaris...

  5. Indexes to Nuclear Regulatory Commission issuances, January 1, 1980--December 31, 1985

    International Nuclear Information System (INIS)

    1989-11-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document

  6. Nuclear Regulatory Commission issuances, June 1997. Volume 45, Number 6

    International Nuclear Information System (INIS)

    1997-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  7. Indexes to Nuclear Regulatory Commission issuances, January--June 1992

    International Nuclear Information System (INIS)

    1992-09-01

    Digests and indexes for insurances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index; and facility index

  8. Indexes to Nuclear Regulatory Commission issuances, January--June 1989

    International Nuclear Information System (INIS)

    1989-09-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Appeal Panel, the Atomic Safety and Licensing Board Panel, the Administrative Law Judge, the Directors' Decisions, and the Denials of Petitions of Rulemaking are presented in this document. The information elements are displayed in one or more of five separate formats. These formats are case named index digests and headers, legal citations index, subject index, and facility index

  9. Opportunities of Optimization in Administrative Structures for Efficient Management

    Directory of Open Access Journals (Sweden)

    Venelin Terziev

    2017-12-01

    Full Text Available Current paper presents studies on the administrative structures in order to optimize the activities and the overall management through the example of the Bulgarian Commission for Protection against Discrimination. It aims at establishing duplicate functions in the organization under study. The main tasks in the analysis are related to the display of the basic findings and conclusions for the strongest sides and the fields for improvement regarding the relevance, the effectiveness and the efficiency of the administration of the Commission for Protection against Discrimination in Bulgaria. The following areas are thoroughly and critically analyzed: relevance of the functions and efficiency of the activity. As a result of the study a Strategy for Organizational Development and a Training Plan have been drafted.

  10. Causes and possible solutions to water resource conflicts in the Okavango River Basin: The case of Angola, Namibia and Botswana

    Science.gov (United States)

    Mbaiwa, Joseph E.

    This paper reviews available literature concerning water resources use in the Okavango River Basin (ORB). It describes a number of common arguments regarding possibilities for the emergence of violent conflict in and among Basin states, particularly those states party to the Okavango River Basin Commission (Okacom)-Angola, Botswana and Namibia. The paper presents data concerning present and future water demands and examines a number of formal, institutional steps taken by global and regional actors to facilitate sustainable development, natural resources management and peaceful cooperation in the Basin. Contrary to trends in much of the literature, the paper suggests that there is great scope for enhanced inter-state cooperation in the Basin. It argues that to achieve sustainable utilisation of water resources and avoid violent conflict in the ORB, an integrated management plan for the entire basin needs to be developed. In addition, each basin member-state should observe international and regional conventions and treaties governing the use of water resources when designing national water development projects that require the use of water from the ORB.

  11. Nuclear Regulatory Commission Issuances. Volume 45, No. 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  12. Nuclear Regulatory Commission Issuances. Volume 45, No. 3

    International Nuclear Information System (INIS)

    1997-03-01

    This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors' Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking

  13. StreamNet: Report on the status of salmon and steelhead in the Columbia River Basin -- 1995

    International Nuclear Information System (INIS)

    Anderson, D.A.; Christofferson, G.; Beamesderfer, R.; Woodard, B.; Rowe, M.; Hansen, J.

    1996-04-01

    Information on fish populations, fisheries, and fish habitat is crucial to the success of ongoing program to protect, recover, enhance, and manage fish resources in the Columbia River Basin. However, pertinent data are often difficult to locate because it is scattered among many agencies and is often unpublished. The goal of this annual report is to bring many diverse data types and sources into a single comprehensive report on the status of anadromous fish runs in the Columbia River Basin and the environmental conditions that may affect that status. Brief summaries are provided to identify the type and scope of available information. This synopsis is intended to complement other more detailed reports to which readers are referred for comprehensive treatment of specific subjects. This first report focuses mainly on anadromous salmon and steelhead (primarily through 1994) but the authors intend to expand the scope of future issues to include resident species. This is the first of what the authors intend to be an annual report. They welcome constructive suggestions for improvements. This report is a product of the StreamNet (formerly Coordinated Information System and Northwest Environmental Data Base) project which is a part of the Bonneville Power Administration's program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The project is called for in the Fish and Wildlife Program of the Northwest Power Planning Council. The project's objective is to promote exchange and dissemination of information in a standardized electronic format throughout the basin. This project is administered by the Pacific States Marine Fisheries Commission with active participation by tribal, state, and federal fish and wildlife agencies

  14. Commissioning MMS

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  15. Views on reform and strengthening of the nuclear energy administrative structure

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    Views of the Study Group on Nuclear Energy Administration, submitted to Prime Minister, are presented, concerning reform and strengthening of the administrative structure. They are based on the ideas of peaceful use, essential energy source, safety and administrative unification. Described are the following: Atomic Energy Commission, safeguard inspection/permission, examinations report, environmental radiation monitoring, public heating, universities relation, and radiation injuries prevention. (Mori, K.)

  16. 78 FR 44971 - Certain Robotic Toys and Components Thereof; Commission Determination Not To Review an Initial...

    Science.gov (United States)

    2013-07-25

    ... Trade Commission has determined not to review the administrative law judge's (``ALJ'') initial..., Tortola, British Virgin Islands; Zuru Ltd. of Kowloon, Hong Kong; and Zuru Toys Inc. of Cambridge, New...

  17. LBA-ECO LC-14 Modeled Deforestation Scenarios, Amazon Basin: 2002-2050

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides the results of the two modeled scenarios for future patterns of deforestation across the Amazon Basin from 2002 to 2050. This larger defined...

  18. LBA-ECO LC-14 Modeled Deforestation Scenarios, Amazon Basin: 2002-2050

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: This data set provides the results of the two modeled scenarios for future patterns of deforestation across the Amazon Basin from 2002 to 2050. This larger...

  19. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  20. Nuclear Regulatory Commission: 1981 annual report

    International Nuclear Information System (INIS)

    1981-01-01

    This seventh annual report of the US Nuclear Regulatory Commission covers major actions, events and planning that occurred during fiscal year 1981, with some coverage of later events, where appropriate. Chapters of the report address the agency's various functions or areas of activity: regulating nuclear power plants; evaluating reactor operating experience; licensing nuclear materials and their transportation; safeguarding nuclear plants and materials; managing nuclear wastes; inspection and enforcement; cooperation with state governments; international activities; research and standards development; hearings; decisions and litigation; and administrative and public communications matters. Each chapter presents a detailed review of program accomplishments during the report period, fiscal year 1981

  1. 78 FR 41950 - Certain Video Game Systems and Wireless Controllers and Components Thereof; Commission...

    Science.gov (United States)

    2013-07-12

    ...Notice is hereby given that the U.S. International Trade Commission has determined to review certain portions of the remand initial determination (``ID'') issued by the presiding administrative law judge (``ALJ'') on May 7, 2013 in the above-captioned investigation.

  2. Resilience in Transboundary Water Governance: the Okavango River Basin

    Directory of Open Access Journals (Sweden)

    Olivia O. Green

    2013-06-01

    Full Text Available When the availability of a vital resource varies between times of overabundance and extreme scarcity, management regimes must manifest flexibility and authority to adapt while maintaining legitimacy. Unfortunately, the need for adaptability often conflicts with the desire for certainty in legal and regulatory regimes, and laws that fail to account for variability often result in conflict when the inevitable disturbance occurs. Additional keys to resilience are collaboration among physical scientists, political actors, local leaders, and other stakeholders, and, when the commons is shared among sovereign states, collaboration between and among institutions with authority to act at different scales or with respect to different aspects of an ecological system. At the scale of transboundary river basins, where treaties govern water utilization, particular treaty mechanisms can reduce conflict potential by fostering collaboration and accounting for change. One necessary element is a mechanism for coordination and collaboration at the scale of the basin. This could be satisfied by mechanisms ranging from informal networks to the establishment of an international commission to jointly manage water, but a mechanism for collaboration at the basin scale alone does not ensure sound water management. To better guide resource management, study of applied resilience theory has revealed a number of management practices that are integral for adaptive governance. Here, we describe key resilience principles for treaty design and adaptive governance and then apply the principles to a case study of one transboundary basin where the need and willingness to manage collaboratively and iteratively is high - the Okavango River Basin of southwest Africa. This descriptive and applied approach should be particularly instructive for treaty negotiators, transboundary resource managers, and should aid program developers.

  3. Indexes to Nuclear Regulatory Commission issuances, July-December 1985. Volume 22, Index 2

    International Nuclear Information System (INIS)

    1986-03-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document

  4. 78 FR 22490 - Administrative Practice and Procedure; Postal Service; Review of Price Cap Rules

    Science.gov (United States)

    2013-04-16

    ...] Administrative Practice and Procedure; Postal Service; Review of Price Cap Rules AGENCY: Postal Regulatory Commission. ACTION: Proposed rule. SUMMARY: The Commission is initiating a review of its Price Cap Rules. The... implemented without a price cap calculation. Docket No. R2011-5, Order Approving Market Dominant Price...

  5. Nuclear Regulatory Commission Issuances, Volume 44, No. 5

    International Nuclear Information System (INIS)

    1996-11-01

    This report includes the issuances received in November 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors' Decisions. Seven issuances were received and are abstracted individually in the database: Emerick S. McDaniel, U.S. Enrichment Corporation, Sequoyah Fuels Corporation and General Atomics, all power reactor licensees, Florida Power and Light Company, Maine Yankee Atomic Power Company, and Northern States Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking

  6. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  7. Indexes to Nuclear Regulatory Commission issuances, July-September 1981. Index 1

    International Nuclear Information System (INIS)

    1981-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  8. Indexes to Nuclear Regulatory Commission issuances, July--December 1988

    International Nuclear Information System (INIS)

    1989-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These information elements are displayed in one or more of five separate formats arranged as follows: case name index, digests and headers, legal citations index, subject index, and facility index

  9. Indexes to Nuclear Regulatory Commission issuances, July--September 1988

    International Nuclear Information System (INIS)

    1989-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These information elements are displayed in one or more of five separate formats. These formats are case name index, digests and headers, legal citations index, subject index and facility index

  10. 2010 U.S. Geological Survey Topographic LiDAR: Atchafalaya Basin, Louisiana

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Light Detection and Ranging (LiDAR) dataset is a survey of the Atchafalaya Basin in south-central Louisiana. The entire survey area encompasses 981 square miles....

  11. Precipitation Frequency for Ohio River Basin, USA - NOAA Atlas 14 Volume 2

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This GIS grid atlas contains precipitation frequency estimates for the Ohio River Basin and Surrounding states is based on precipitation data collected between...

  12. 47 CFR 1.1936 - Administrative wage garnishment.

    Science.gov (United States)

    2010-10-01

    ... amounts from an employee's disposable pay and the paying of those amounts to a creditor in satisfaction of... of Claims Owed the United States Salary Offset-Individual Debt § 1.1936 Administrative wage... collection of delinquent nontax debt owed to the Commission from the wages of Federal employees from their...

  13. 78 FR 39279 - United States Department of Energy; Bonneville Power Administration; Notice of Petition for...

    Science.gov (United States)

    2013-07-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ13-10-000] United States Department of Energy; Bonneville Power Administration; Notice of Petition for Declaratory Order Take notice... (OATT) and a Petition for Declaratory Order requesting the Commission find that Bonneville's OATT, as...

  14. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Science.gov (United States)

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  15. Nuclear Regulatory Commission issuances. Volume 44, Number 2

    International Nuclear Information System (INIS)

    1996-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM). The topics of this publication include the dismissal of a suit brought against Georgia Power Company in the transfer of Vogtle Electric Generating Plant, units 1 and 2 to Southern Nuclear; and denial of a petition to review the entire licensing process for Watts Bar Nuclear Plant, Unit 1 operated by the Tennessee Valley Authority

  16. Nuclear Regulatory Commission issuances, Volume 46, No. 4

    International Nuclear Information System (INIS)

    1997-10-01

    This report includes the issuances received in October 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors' Decisions. Five issuances were received on the following subjects: (1) decontamination and decommissioning funding for Sequoyah Fuels Corporation and General Atomics; (2) involvement in NRC-licensed activities by Aharon Ben-Haim; (3) Barnett Industrial X-Ray, Inc.; (4) spent fuel storage installation at Northern States Power Company; and (5) Vermont Yankee Nuclear Power Station. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking

  17. Nuclear Regulatory Commission issuances, Volume 46, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This report includes the issuances received in October 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. Five issuances were received on the following subjects: (1) decontamination and decommissioning funding for Sequoyah Fuels Corporation and General Atomics; (2) involvement in NRC-licensed activities by Aharon Ben-Haim; (3) Barnett Industrial X-Ray, Inc.; (4) spent fuel storage installation at Northern States Power Company; and (5) Vermont Yankee Nuclear Power Station. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  18. 75 FR 43915 - Basin Electric Power Cooperative: Deer Creek Station

    Science.gov (United States)

    2010-07-27

    ... factors that could be affected by the proposed Project were evaluated in detail in the EIS. These issues... DEPARTMENT OF AGRICULTURE Rural Utilities Service Basin Electric Power Cooperative: Deer Creek... Energy Facility project (Project) in Brookings and Deuel Counties, South Dakota. The Administrator of RUS...

  19. LBA-ECO LC-07 Wetland Extent, Vegetation, and Inundation: Lowland Amazon Basin

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides a map of wetland extent, vegetation type, and dual-season flooding state of the entire lowland Amazon basin. The map was derived from mosaics...

  20. Indexes to Nuclear Regulatory Commission Issuances, July--December 1993

    International Nuclear Information System (INIS)

    1994-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Digests and Headers; Legal Citations Index; Subject Index, and Facility Index

  1. Indexes to Nuclear Regulatory Commission issuances, July--September 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Digest and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. these digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index, and facility index

  2. Indexes to Nuclear Regulatory Commission issuances, July--December, 1991

    International Nuclear Information System (INIS)

    1991-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Digests and Headers; Legal Citations Index; Subject Index; and Facility Index

  3. Indexes to Nuclear Regulatory Commission issuances, January--March 1993

    International Nuclear Information System (INIS)

    1993-07-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index; and facility index

  4. Indexes to Nuclear Regulatory Commission issuances, January--March 1992

    International Nuclear Information System (INIS)

    1992-06-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; Digests and headers; Legal citations index; subject index; and facility index

  5. Cross-comparison of climate change adaptation strategies across large river basins in Europe, Africa and Asia

    Czech Academy of Sciences Publication Activity Database

    Krysanova, V.; Dickens, C.; Timmerman, J.; Varela-Ortega, C.; Schlüter, M.; Roest, K.; Huntjens, P.; Jaspers, F.; Buiteveld, H.; Moreno, E.; de Pedraza Carrera, J.; Slámová, Romana; Martínková, M.; Blanco, I.; Esteve, P.; Pringle, K.; Pahl-Wostl, C.; Kabat, P.

    2010-01-01

    Roč. 24, č. 14 (2010), s. 4121-4160 ISSN 0920-4741 EU Projects: European Commission(XE) 511179 - NEWATER Institutional research plan: CEZ:AV0Z20600510 Keywords : adaptation to climate change * water management * questionnaire * barrier * driver * climate change * river basin * Amudarya * Elbe * Guadiana * Nile equatorial lakes region * Orange * Rhine Subject RIV: DA - Hydrology ; Limnology Impact factor: 2.201, year: 2010

  6. Guidelines for residential commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  7. The Ogaden Basin, Ethiopia: an underexplored sedimentary basin

    Energy Technology Data Exchange (ETDEWEB)

    Teitz, H.H.

    1991-01-01

    A brief article examines the Ogaden Basin in Ethiopia in terms of basin origin, basin fill and the hydrocarbon exploration history and results. The natural gas find in pre-Jurassic sandstones, which appears to contain substantial reserves, justifies continuing investigations in this largely underexplored basin. (UK).

  8. Fair Apportionment in the View of the Venice Commission's Recommendation

    OpenAIRE

    Biró, Péter; Kóczy, László Á.; Sziklai, Balázs

    2013-01-01

    In this paper we analyze the consequences of the fairness recommendation of the Venice Commission in allocating voting districts among larger administrative regions. This recommendation requires the size of any constituency not to differ from the average constituency size by more than a fixed limit. We show that this minimum difference constraint, while attractive per definition, is not compatible with monotonicity and Hare-quota properties, two standard requirements of apportionment rules. W...

  9. Commission of energy regulation. 2004 activity report; Commission de regulation de l'energie. Rapport d'activite 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The commission of energy regulation (CRE) is an independent administrative authority in charge of the control of the operation of gas and electricity markets. This document is the fifth activity report of CRE and covers the July 1, 2003 - June 30, 2004 period, which corresponds to the era of opening of energy markets as a consequence of the enforcement of the June 26, 2003 European directive. In the framework of the stakes made by energy markets liberalization, this document presents the situation of the gas and electricity markets during this period (European framework, regulation of both markets, public utility mission..) and describes CRE's means for the monitoring of these markets. (J.S.)

  10. Report by the national commission of assessment of financing of costs of decommissioning base nuclear installations and installations of management used fuels and radioactive wastes (CNEF) - July 2012

    International Nuclear Information System (INIS)

    Lepine, J.L.

    2012-07-01

    This report is a first assessment of the control which must be performed by the administrative authority to ensure the compliance with long term financial obligations for operators of base nuclear installations. After a presentation of the administrative authority, this document reports the assessment of liabilities and of dedicated assets, and the remarks made by the commission regarding the administrative authority organisation and function, the previous assessments, uncertainties concerning the cost of the deep geological storage project, and the future activity of the Commission

  11. LBA-ECO LC-15 Aerodynamic Roughness Maps of Vegetation Canopies, Amazon Basin: 2000

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set, LBA-ECO LC-15 Aerodynamic Roughness Maps of Vegetation Canopies, Amazon Basin: 2000, provides physical roughness maps of vegetation canopies in the...

  12. Unit-Specific Contingency Plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-04-01

    This document is a supplement to DOE/RL-93-75, 'Hanford Contingency Plan.' It provides the unit-specific information needed to fully comply with the Washington Administrative Code. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins were four concrete internal surfaces, which contained radiologically and hazardous contaminated waste. The 183-H Basin area is a final status treatment, storage, and disposal unit undergoing Resource Conservation and Recovery Act modified post- closure care

  13. 18 CFR 401.124 - Construction.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Construction. 401.124 Section 401.124 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE General Provisions § 401.124 Construction. This part is...

  14. Liberalism, authority, and bioethics commissions.

    Science.gov (United States)

    MacDougall, D Robert

    2013-12-01

    Bioethicists working on national ethics commissions frequently think of themselves as advisors to the government, but distance themselves from any claims to actual authority. Governments however may find it beneficial to appear to defer to the authority of these commissions when designing laws and policies, and might appoint such commissions for exactly this reason. Where does the authority for setting laws and policies come from? This question is best answered from within a normative political philosophy. This paper explains the locus of moral authority as understood within one family of normative political theories--liberal political theories--and argues that most major "liberal" commentators have understood both the source and scope of ethics commissions' authority in a manner at odds with liberalism, rightly interpreted. The author argues that reexamining the implications of liberalism for bioethics commissions would mean changing what are considered valid criticisms of such commissions and also changing the content of national bioethics commission mandates. The author concludes that bioethicists who participate in such commissions ought to carefully examine their own views about the normative limits of governmental authority because such limits have important implications for the contribution that bioethicists can legitimately make to government commissions.

  15. 47 CFR 0.557 - Administrative review of an initial decision not to amend a record.

    Science.gov (United States)

    2010-10-01

    ... COMMISSION ORGANIZATION Privacy Act Regulations § 0.557 Administrative review of an initial decision not to... conduct an independent review of the record in controversy using the standards of review set out in § 0... expected to be completed. (c) If upon review of the record in controversy the Commission agrees with the...

  16. LBA-ECO CD-06 Physical, Political, and Hydrologic Maps, Ji-Parana River Basin, Brazil

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: This data set contains physical, hydrologic, political, demographic, and societal maps for the Ji-Parana River Basin, in the state of Rondonia, Brazil....

  17. LBA-ECO CD-06 Physical, Political, and Hydrologic Maps, Ji-Parana River Basin, Brazil

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains physical, hydrologic, political, demographic, and societal maps for the Ji-Parana River Basin, in the state of Rondonia, Brazil. These data...

  18. Report on the activities of the PAU Commission on the History of Science in 2015/2016

    Directory of Open Access Journals (Sweden)

    Michał Kokowski

    2016-11-01

    Full Text Available The report discusses the activities of the Commission on the History of Science of the Polish Academy of Arts and Sciences in 2015/2016. It presents the lists of: scientific meeting, administrative-election meetings, new members, and new publications.

  19. Indexes to Nuclear Regulatory Commission issuances, July-December 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: case name index; digests and headers; legal citations index; subject index; and facility index

  20. Indexes to Nuclear Regulatory Commission issuances, January--June 1991

    International Nuclear Information System (INIS)

    1991-10-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index, digest and headers, legal citations index, subject index, and facility index

  1. Indexes to Nuclear Regulatory Commission issuances, January--March 1991

    International Nuclear Information System (INIS)

    1991-06-01

    Digests and indexes for Issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: case name index, digests and headers, logical citations index, subject index and facility index

  2. Indexes to Nuclear Regulatory Commission issuances, January-March 1982

    International Nuclear Information System (INIS)

    1982-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. This information is displayed in one or more of five separate formats arranged as follows: case name index; digests and headers; legal citations index; subject index; and facility index

  3. Indexes to Nuclear Regulatory Commission issuances, January--June 1990

    International Nuclear Information System (INIS)

    1990-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALI), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: case name index, digests and headers, legal citations index, subject index, and facility index

  4. Indexes to Nuclear Regulatory Commission issuances, July--September 1990

    International Nuclear Information System (INIS)

    1990-12-01

    Digests and indexes for issuances of the commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. The information elements are displayed in one or more of five separate formats arranged as follows: case name index, digests and headers, legal citations index, subject index, and facility index

  5. Indexes to Nuclear Regulatory Commission issuances, July--December 1990

    International Nuclear Information System (INIS)

    1991-03-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: case name index, digests and headers legal citations index, subject index, and facility index

  6. ALARA Review for the Sediment Relocation and Removal from the 105-N Fuel Storage Basin

    International Nuclear Information System (INIS)

    Demers, J.W.

    1998-01-01

    This as low as reasonable achievable (ALARA) review revision provides a description of the engineering and administrative controls used to manage personnel exposure, control contamination levels, and airborne radioactivity concentrations during sediment relocation and removal in the 105-N Fuel Storage Basin. This document updates and supercedes the ALARA review of the sediment-related activities contained in 100-N Basin Stabilization Project As Low As Reasonably Achievable Plan (BHI 1995)

  7. 17 CFR 200.25 - Office of Administrative and Personnel Management.

    Science.gov (United States)

    2010-04-01

    ... COMMISSION ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Organization and Program Management... employee records. OAPM administers the Ethics Program, and helps the Office of the Executive Director...; procurement and contracting; property management; contract and lease administration; space acquisition and...

  8. Commission Conditions d'emploi

    CERN Multimedia

    Staff Association

    2017-01-01

    Au CERN, nous avons la formidable possibilité d’imaginer nos CONDITIONS D’EMPLOIS. Rendez-vous compte ! Nous avons le pouvoir de proposer des idées et de les défendre pour avoir des conditions d’emplois qui soient les plus attractives possibles pour le personnel en place et à venir. ---------------- L’Association du personnel du CERN, tout le monde connait ou en a entendu parler. Ce qui est moins connu, ce sont les diverses commissions internes qui traitent des sujets propres à défendre les intérêts du personnel. Les publications dans notre journal, l’Echo, sont un des moyens à notre disposition pour vous faire découvrir chacune des commissions internes de l’Association du personnel (voir Echo n°242 sur la commission juridique, et Echo n°255 sur la commission des cas particuliers). Commission Conditions d&...

  9. Indexes to Nuclear Regulatory Commission Issuances, January 1996--June 1996

    International Nuclear Information System (INIS)

    1996-09-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Board Panel, The Administrative Law Judges, the Director's Decisions, and the Decisions on Petitions for Rulemaking are presented in this document. The digests and indexes are intended to serve as a guide to the issuances. Information elements common the cases hear and ruled upon are displayed in one or more of five formats: case name index, headers and digests, legal citations index, subject index, and facility index

  10. Indexes to Nuclear Regulatory Commission Issuances, January 1996--June 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Board Panel, The Administrative Law Judges, the Director`s Decisions, and the Decisions on Petitions for Rulemaking are presented in this document. The digests and indexes are intended to serve as a guide to the issuances. Information elements common the cases hear and ruled upon are displayed in one or more of five formats: case name index, headers and digests, legal citations index, subject index, and facility index.

  11. Safe LHC beam commissioning

    International Nuclear Information System (INIS)

    Uythoven, J.; Schmidt, R.

    2007-01-01

    Due to the large amount of energy stored in magnets and beams, safety operation of the LHC is essential. The commissioning of the LHC machine protection system will be an integral part of the general LHC commissioning program. A brief overview of the LHC Machine Protection System will be given, identifying the main components: the Beam Interlock System, the Beam Dumping System, the Collimation System, the Beam Loss Monitoring System and the Quench Protection System. An outline is given of the commissioning strategy of these systems during the different commissioning phases of the LHC: without beam, injection and the different phases with stored beam depending on beam intensity and energy. (author)

  12. Commissioning of NSLS-II

    Energy Technology Data Exchange (ETDEWEB)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  13. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  14. Integrated Hydrographical Basin Management. Study Case - Crasna River Basin

    Science.gov (United States)

    Visescu, Mircea; Beilicci, Erika; Beilicci, Robert

    2017-10-01

    Hydrographical basins are important from hydrological, economic and ecological points of view. They receive and channel the runoff from rainfall and snowmelt which, when adequate managed, can provide fresh water necessary for water supply, irrigation, food industry, animal husbandry, hydrotechnical arrangements and recreation. Hydrographical basin planning and management follows the efficient use of available water resources in order to satisfy environmental, economic and social necessities and constraints. This can be facilitated by a decision support system that links hydrological, meteorological, engineering, water quality, agriculture, environmental, and other information in an integrated framework. In the last few decades different modelling tools for resolving problems regarding water quantity and quality were developed, respectively water resources management. Watershed models have been developed to the understanding of water cycle and pollution dynamics, and used to evaluate the impacts of hydrotechnical arrangements and land use management options on water quantity, quality, mitigation measures and possible global changes. Models have been used for planning monitoring network and to develop plans for intervention in case of hydrological disasters: floods, flash floods, drought and pollution. MIKE HYDRO Basin is a multi-purpose, map-centric decision support tool for integrated hydrographical basin analysis, planning and management. MIKE HYDRO Basin is designed for analyzing water sharing issues at international, national and local hydrographical basin level. MIKE HYDRO Basin uses a simplified mathematical representation of the hydrographical basin including the configuration of river and reservoir systems, catchment hydrology and existing and potential water user schemes with their various demands including a rigorous irrigation scheme module. This paper analyzes the importance and principles of integrated hydrographical basin management and develop a case

  15. A Virtual Commissioning Learning Platform

    DEFF Research Database (Denmark)

    Mortensen, Steffen; Madsen, Ole

    2018-01-01

    The introduction of reconfigurable manufacturing systems (RMS), Industry 4.0 and the associated technologies requires the establishment of new competencies. Towards that goal, Aalborg University (AAU) has developed an Industry 4.0 learning factory, the AAU Smart Production Lab. The AAU Smart...... Production Lab integrates a number of Industry 4.0 technologies for learning and research purposes. One of the many techniques is virtual commissioning. Virtual commissioning uses a virtual plant model and real controllers (PLCs) enabling a full emulation of the manufacturing system for verification. Virtual...... commissioning can lower the commissioning time up to 63%, allowing faster time to market. However, virtual commission is still missing industrial impact one of the reasons being lack of competencies and integration experiences. The paper presents the setup of the virtual commissioning learning platform...

  16. Fishes and aquatic habitats of the Orinoco River Basin: diversity and conservation.

    Science.gov (United States)

    Lasso, C A; Machado-Allison, A; Taphorn, D C

    2016-07-01

    About 1000 freshwater fishes have been found so far in the Orinoco River Basin of Venezuela and Colombia. This high ichthyological diversity reflects the wide range of landscapes and aquatic ecosystems included in the basin. Mountain streams descend from the high Andes to become rapid-flowing foothill rivers that burst out upon vast savannah flatlands where they slowly make their way to the sea. These white-water rivers are heavily laden with sediments from the geologically young Andes. Because their sediment deposits have formed the richest soils of the basin, they have attracted the highest density of human populations, along with the greatest levels of deforestation, wildfires, agricultural biocides and fertilizers, sewage and all the other impacts associated with urban centres, agriculture and cattle ranching. In the southern portion of the basin, human populations are much smaller, where often the only inhabitants are indigenous peoples. The ancient rocks and sands of the Guiana Shield yield clear and black water streams of very different quality. Here, sediment loads are miniscule, pH is very acid and fish biomass is only a fraction of that observed in the rich Andean tributaries to the north. For each region of the basin, the current state of knowledge about fish diversity is assessed, fish sampling density evaluated, the presence of endemic species and economically important species (for human consumption or ornamental purposes) described and gaps in knowledge are pointed out. Current trends in the fishery for human consumption are analysed, noting that stocks of many species are in steep decline, and that current fishing practices are not sustainable. Finally, the major impacts and threats faced by the fishes and aquatic ecosystems of the Orinoco River Basin are summarized, and the creation of bi-national commissions to promote standardized fishing laws in both countries is recommended. © 2016 The Fisheries Society of the British Isles.

  17. Commission of energy regulation. 2004 activity report

    International Nuclear Information System (INIS)

    2004-01-01

    The commission of energy regulation (CRE) is an independent administrative authority in charge of the control of the operation of gas and electricity markets. This document is the fifth activity report of CRE and covers the July 1, 2003 - June 30, 2004 period, which corresponds to the era of opening of energy markets as a consequence of the enforcement of the June 26, 2003 European directive. In the framework of the stakes made by energy markets liberalization, this document presents the situation of the gas and electricity markets during this period (European framework, regulation of both markets, public utility mission..) and describes CRE's means for the monitoring of these markets. (J.S.)

  18. Regional prognosis criteria for the sandstone type uranium deposits in interlayer oxidation zone and their application in the east of Junggar basin, Xinjiang

    International Nuclear Information System (INIS)

    Han Deren; Bai Fengzhou; Lin Shuangxing

    1995-01-01

    Regional prognosis is of a very important role in the exploration work of the sandstone type uranium deposits of interlayer oxidation zone. This paper presents regional prognosis criteria on the basis of the authors' research in combination with the geological prediction in the east of Junggar Basin, Xinjiang (1:200000) which was jointly carried out with the Red Hill Geological Complex of the National Mineral Resources Commission of Uzbekistan Republic. It is advantageous to the exploration work of the sandstone type uranium deposits of interlayer oxidation zone in Meso-Cenozoic basins of China

  19. Indexes to Nuclear Regulatory Commission issuances, July-September 1982. Vol. 16. Index 1

    International Nuclear Information System (INIS)

    1982-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  20. Estimates of the commission on ecological situation around the enterprise Mayak of the USSR Minatomenergoprom that was organized by the Presidium of the USSR Academy of Sciences No. 1140-501, June 12 1990

    International Nuclear Information System (INIS)

    Bol'shakov, V.N.; Aleksakhin, R.M.; Bol'shov, L.A.; Kochetkov, L.A.; Tsyb, A.F.; Chukanov, V.N.; Petukhov, V.I.

    1991-01-01

    Experts commission of the USSR Academy of Sciences under supervision of a Soviet academician V.N.Bol'shakov revealed crisis ecological situation created in the basin if the Techa river by the operation of the industrial plant Mayak. Although the experts commission results were not complete and many aspect of radioecological safety escaped the experts attention the given data on contamination of the region and human populations reflect the truthful crisis situation in the region of the industrial plant Mayak

  1. Commission of energy regulation. 2004 activity report; Commission de regulation de l'energie. Rapport d'activite 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    The commission of energy regulation (CRE) is an independent administrative authority in charge of the control of the operation of gas and electricity markets. This document is the fifth activity report of CRE and covers the July 1, 2003 - June 30, 2004 period, which corresponds to the era of opening of energy markets as a consequence of the enforcement of the June 26, 2003 European directive. In the framework of the stakes made by energy markets liberalization, this document presents the situation of the gas and electricity markets during this period (European framework, regulation of both markets, public utility mission..) and describes CRE's means for the monitoring of these markets. (J.S.)

  2. 76 FR 43890 - Technical Amendment to Commission Procedures for Filing Applications for Orders for Exemptive...

    Science.gov (United States)

    2011-07-22

    ... to clarify and update references to an SEC Web site address and to eliminate certain formatting... Commission is amending Sec. 240.0-12(b) to update references to an SEC Web site address to be used in... formatting requirements. I. Certain Findings Under the Administrative Procedure Act (``APA''), notice of...

  3. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  4. Nuclear Regulatory Commission information digest

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  5. A Guide to Building Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  6. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  7. Dousing the tension in the Niger delta through administrative agency

    African Journals Online (AJOL)

    Dousing the tension in the Niger delta through administrative agency: A programme evaluation of Niger delta development commission as an intervention regime. ... the study concludes that because of systemic constraints arising from the hegemonic interests of the dominant coalitions in the Nigerian Social formation, ...

  8. Nuclear Regulatory Commission issuances, Volume 44, No. 4

    International Nuclear Information System (INIS)

    1996-10-01

    This report includes the issuances received in October 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors' Decisions. 15 issuances were received and are abstracted individually in the database: Louisiana Energy Services, U.S. Enrichment Corporation, Yankee Atomic Electric Company, General Public Utilities Nuclear Corporation, James L. Shelton, Juan Guzman, Northern States Power Company, TESTCO Inc., Washington Public Power Supply System, all nuclear plants, Cleveland Electric Illuminating Company, Duke Power Company, Florida Power Corporation, and Northeast Nuclear Energy Company (2 issuances). No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking

  9. Nuclear Regulatory Commission issuances, Volume 44, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This report includes the issuances received in October 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 15 issuances were received and are abstracted individually in the database: Louisiana Energy Services, U.S. Enrichment Corporation, Yankee Atomic Electric Company, General Public Utilities Nuclear Corporation, James L. Shelton, Juan Guzman, Northern States Power Company, TESTCO Inc., Washington Public Power Supply System, all nuclear plants, Cleveland Electric Illuminating Company, Duke Power Company, Florida Power Corporation, and Northeast Nuclear Energy Company (2 issuances). No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  10. Assessing the effectiveness of Multi-Sector Partnerships to manage droughts: The case of the Jucar river basin

    Science.gov (United States)

    Carmona, María.; Máñez Costa, María.; Andreu, Joaquín.; Pulido-Velazquez, Manuel; Haro-Monteagudo, David; Lopez-Nicolas, Antonio; Cremades, Roger

    2017-07-01

    South-east Spain is a drought prone area, characterized by climate variability and water scarcity. The Jucar River Basin, located in Eastern Spain, has suffered many historical droughts with significant socio-economic impacts. For nearly a hundred years, the institutional and non-institutional strategies to cope with droughts have been successful through the development of institutions and partnerships for drought management including multiple actors. In this paper, we show how the creation and institutionalisation of Multi-Sector Partnerships (MSPs) has supported the development of an efficient drought management. Furthermore, we analyze the performance of one of the suggested instruments by the partnership related to drought management in the basin. Two methodologies are used for these purposes. On one hand, the Capital Approach Framework to analyze the effectiveness of the governance processes in a particular partnership (Permanent Drought Commission), which aims to highlight the governance strength and weakness of the MSP for enhancing drought management in the Jucar River Basin. Through a dynamic analysis of the changes that the partnership has undergone over time to successfully deal with droughts, its effectiveness on drought management is demonstrated. On the other hand, an econometric approach is used to analyze the economic efficiency of the emergency drought wells as one of the key drought mitigation measures suggested by the Permanent Drought Commission and implemented. The results demonstrate the potential and efficiency of applying drought wells as mitigation measures (significant reduction of economic losses, around 50 M€ during the drought period, 2005-2008).

  11. Indexes to Nuclear Regulatory Commission issuances, July-December 1984. Volume 20, Index 2

    International Nuclear Information System (INIS)

    1985-03-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking for the period July-December 1984 are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  12. Developing a Science-based River Basin Management Plan for the Kharaa River Basin, Mongolia

    Science.gov (United States)

    Karthe, Daniel

    2013-04-01

    management. In the past, shared and unclear responsibilities, a spatial mismatch between administrative and river basin boundaries, the lack of relevant information, financial resources and implementation capacity resulted in an uncoordinated and partially uncontrolled exploitation of water resources (Livingstone et al. 2009; Horlemann et al. 2012). The recent decision of the Mongolian government to develop river basin management plans and to provide for their implementation through river basin councils and administrations, and the comparatively good data availability resulting from the R&D project, resulted in the decision to jointly develop a science-based river basin management plan for the KRB as a model region for other river basins of the country. References: Hartwig, M.; Theuring, P.; Rode, M. & Borchardt, D. (2012): Suspended sediments in the Kharaa River catchment (Mongolia) and its impact on hyporheic zone functions. Environmental Earth Sciences 65(5):1535-1546. Hofmann, J.; Venohr, M.; Behrendt, H. & Opitz, D. (2010): Integrated Water Resources Management in Central Asia: Nutrient and heavy metal emissions and their relevance for the Kharaa River Basin, Mongolia. Water Science and Technology 62(2):353-363. Horlemann, L. & Dombrowsky, I. (2012): Institutionalising IWRM in developing and transition countries: the case of Mongolia. Environmental Earth Sciences 65(5):1547-1559. Karthe, D.; Borchardt, D. & Hufert, F. (2012a): Implementing IWRM: Experiences from a Central Asian Model Region. In: Pandya, A.B. (Ed.) (2012): India Water Week 2012. Water, Energy and Food Security: Call for Solutions, Part A3, pp. 1-15. Delhi: Ministry of Water Resources, Government of India. Karthe, D.; Sigel, K.; Scharaw, B. et al. (2012b): Towards an integrated concept for monitoring and improvements in water supply, sanitation and hygiene (WASH) in urban Mongolia. Water & Risk 20:1-5. Karthe, D.; Malsy, M.; Kopp, B. & Minderlein, S. (2013): Assessing Water Availibility and its Drivers in

  13. 18 CFR 401.2 - Concept of the plan.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Concept of the plan. 401.2 Section 401.2 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Comprehensive Plan § 401.2 Concept of the plan. (a) The...

  14. 78 FR 51192 - World War I Centennial Commission; Notification of Upcoming Public Advisory Meeting; Sunshine Act...

    Science.gov (United States)

    2013-08-20

    ... GENERAL SERVICES ADMINISTRATION [Notice-WWICC-2013-01; Docket No. 2013-0007; Sequence 1] World War I Centennial Commission; Notification of Upcoming Public Advisory Meeting; Sunshine Act Meetings Time and Date: Open: 9:30 a.m.-5:30 p.m. (Central Time) on Friday, September 13, 2013. Place: The...

  15. 78 FR 38307 - Gresham Municipal Utilities; Notice of Application Tendered for Filing With the Commission and...

    Science.gov (United States)

    2013-06-26

    ... Gresham, Wisconsin, Attn: Art Bahr, Village Administrator, 1126 Main Street, PO Box 50, Gresham, WI 54128... of the Commission's regulations, if any resource agency, Indian Tribe, or person believes that an... analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request...

  16. 78 FR 38308 - Gresham Municipal Utilities; Notice of Application Tendered for Filing With the Commission and...

    Science.gov (United States)

    2013-06-26

    ... Gresham, Wisconsin, Attn: Art Bahr, Village Administrator, 1126 Main Street, PO Box 50, Gresham, WI 54128... of the Commission's regulations, if any resource agency, Indian Tribe, or person believes that an... analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request...

  17. 78 FR 5556 - Public Hearing

    Science.gov (United States)

    2013-01-25

    ... SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold a public hearing on February 14, 2013, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the...

  18. 77 FR 64576 - Public Hearing

    Science.gov (United States)

    2012-10-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold a public hearing on November 15, 2012, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the...

  19. 78 FR 43961 - Public Hearing

    Science.gov (United States)

    2013-07-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold a public hearing on August 15, 2013, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the...

  20. 77 FR 44703 - Public Hearing

    Science.gov (United States)

    2012-07-30

    ... SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold a public hearing on August 23, 2012, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the...

  1. 78 FR 64260 - Public Hearing

    Science.gov (United States)

    2013-10-28

    ... SUSQUEHANNA RIVER BASIN COMMISSION Public Hearing AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold a public hearing on November 13, 2013, in Harrisburg, Pennsylvania. At this public hearing, the Commission will hear testimony on the...

  2. 47 CFR 1.1528 - Commission review.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission review. 1.1528 Section 1.1528... Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on its own initiative, in...

  3. Salmonid Gamete Preservation in the Snake River Basin, 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, Robyn; Kucera, Paul A. (Nez Perce Tribe, Lapwai, ID)

    1999-03-01

    Steelhead (Oncorhynchus mykiss) and salmon (Oncorhynchus tshawytscha)populations in the Northwest are decreasing. The Nez Perce Tribe (Tribe) was funded in 1998 by the Bonneville Power Administration to coordinate gene banking of male gametes from Endangered Species Act (ESA) listed steelhead and spring and summer chinook salmon in the Snake River basin.

  4. LBA-ECO LC-07 JERS-1 SAR Wetlands Masks and Land Cover, Amazon Basin: 1995-1996

    Data.gov (United States)

    National Aeronautics and Space Administration — ABSTRACT: This data set provides three Amazon Basin wetland image products: (1) a Central Amazon Wetlands Mask, (2) a Central Amazon Wetlands Vegetative-hydrologic...

  5. Opening of energy markets: the point-of-view of the commission

    International Nuclear Information System (INIS)

    Anon.

    2002-01-01

    A report from the European commission, spread to the public on October 3, 2002, reveals the unequal progresses made in the opening of gas and power markets. This report, carried out on request of the European council of Barcelona (Spain) and written from information given by administrations and national regulation authorities, indicates some new headings in several member states concerning the policies implemented for the development of competition, the degree of activity of clients and the impact on the consumers'tariffs. (J.S.)

  6. Atomic Energy Commission Act, 1963

    International Nuclear Information System (INIS)

    1963-01-01

    Promulgated in 1963, the Atomic Energy Commission Act (204) established and vested in the Ghana Atomic Energy Commission the sole responsibility for all matters relating to the peaceful uses of atomic energy in the country. Embodied in the Act are provisions relating to the powers, duties, rights and liabilities of the Commission. (EAA)

  7. Tropical Cyclone Exposure for U.S. waters within the Eastern Pacific Ocean basin, 1900-2013

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — These data represent modeled, historical exposure of U.S. offshore and coastal waters to tropical cyclone activity within the Eastern Pacific Ocean basin. BOEM Outer...

  8. Tropical Cyclone Exposure for U.S. waters within the North Atlantic Ocean basin, 1900-2013

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — These data represent modeled, historical exposure of U.S. offshore and coastal waters to tropical cyclone activity within the North Atlantic Ocean basin. BOEM Outer...

  9. Role of the team of scientific and technical commissioning support (TSTCS) during Mochovce NPP unit 3 and 4 commissioning

    International Nuclear Information System (INIS)

    Hermansky, J.; Prachar, M.; Sedlacek, M.; Petenyi, V.

    2011-01-01

    The Team of Scientific and Technical Commissioning Support (TSTCS) shall provide an independent support for the Mochovce NPP 3 and 4 Commissioning Department during Mochovce Units 3 and 4 commissioning. This independent support will be in line with the Mochovce NPP 3 and 4 Directive 'Non-active tests and commissioning' and it will be carried out in form of professional and expert works focusing on supervision of fulfilment of requirements for nuclear safety observance. The TSTCS duty to provide for such services during NPP commissioning is specified by Slovak Regulatory Body legislation. The independent TSTCS will supervise; - fulfilment of requirements for nuclear safety during preparation and implementation of commissioning tests; -scientific and technical level of commissioning programmes, and reflection on nuclear safety requirements in commissioning programmes,- commissioning process and test results. Main standpoints of the Team activities for individual unit commissioning stages will be; - assesment of the selected programs of functional tests in installations having an impact on nuclear safety and evaluation of the results of these tests; - assesment of the programs of physics and power commissioning, - assesment of the unit preparedness before fuel loading start; - assesment of the unit preparedness for performing initial criticality and low power commissioning and power commissioning stages; - evaluation of the results of physics and power commissioning stages and sub-stages; - final evaluation of the results from implementing the physics and power commissioning stages. The paper also presents a short description of the Team scope activities, the Team organisation, and a procedure for issuing of standpoints to individual unit commissioning stages. (Authors)

  10. Administrative changes (Consequential Provisions) Act 1976, No. 91

    International Nuclear Information System (INIS)

    1976-01-01

    This Act which amends a series of Acts from the viewpoint of administrative changes also amends the Atomic Energy Act 1953 by laying down that the Territories of Papua and New Guinea are henceforth to be omitted from the list of Territories for which the Atomic Energy Commission must obtain approval from the competent Minister before exercising its powers. (NEA) [fr

  11. LBA-ECO LC-07 JERS-1 SAR Wetlands Masks and Land Cover, Amazon Basin: 1995-1996

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides three Amazon Basin wetland image products: (1) a Central Amazon Wetlands Mask, (2) a Central Amazon Wetlands Vegetative-hydrologic Land Cover...

  12. 18 CFR 401.32 - Concept of 3.8.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Concept of 3.8. 401.32 Section 401.32 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE Project Review Under Section 3.8 of the Compact § 401.32 Concept...

  13. Unit-specific contingency plan for the 183-H solar evaporation basins. Revision 1

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1996-03-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H solar evaporation basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  14. Unit-specific contingency plan for the 183-H Solar Evaporation Basins. Revision 2

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1997-01-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  15. EC4IT - A Guide to European Commission Projects for CERN/IT department

    CERN Document Server

    Jones, R

    2012-01-01

    European Commission (EC) projects represent an important source of external funding for a number of activities in which IT department is involved. The EC has a set of procedures and formalities for the preparation, negotiation, execution and completion of projects that are different to those normally used at CERN. This document gives an overview of the administrative, financial, reporting and managerial steps involved in participating in an EC project.

  16. Indexes to Nuclear Regulatory Commission issuances, January-June 1986. Volume 23, Index 2

    International Nuclear Information System (INIS)

    1986-01-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Appeal Panel, the Atomic Safety and Licensing Board Panel, the Administrative Law Judge, the Directors' Decisions, and the Denials of Petitions of Rulemaking are presented in this document. The information elements are displayed in one or more of five separate formats. These formats are case name index, digests and headers, legal citations index, subject index, and facility index

  17. Indexes to Nuclear Regulatory Commission Issuances, July-September 1985. Volume 22, Index 1

    International Nuclear Information System (INIS)

    1985-12-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. The period from July through September 1985 is covered

  18. The Danish Welfare Commission

    DEFF Research Database (Denmark)

    Gjerding, Allan Næs

    2006-01-01

    on public services, and install economic incentives for the behaviour of private households. The paper then digs into the proposals of the commission that are broadly grouped into five policy target areas con-cerning (1) the ageing of the population, (2) the incentives for labour market participation, (3......The paper deals with the main report of the Danish Welfare Commission and the one-hundred-and-nine proposals on the structure of the future Danish welfare state that the com-mission has put forward. Following upon a brief review of the discussion on the work of the Danish Welfare Commission......) competitiveness in the global economy, (4) behavioural regulation of the use of public bene-fits and services, and (5) management within tight budgets of an increasing demand on health and care. Finally, the concluding section sums up the discussion and elaborates on the debate on the Welfare Commission’s work...

  19. Redesign and modernization of radioactive waste administration systems in Ukraine

    Energy Technology Data Exchange (ETDEWEB)

    Nieder-Westermann, Gerald H.; Walther, Thorsten; Krone, Juergen [DBE Technology GmbH, Peine (Germany)

    2016-06-15

    The European Commission (EC) has undertaken a series of projects to render assistance to Ukraine in modernizing and redesigning the Ukrainian approach to the administration, management and ultimately disposal of all forms of radioactive waste, including waste associated with the Chornobyl accident as well as waste generated as part of the Ukrainian energy infrastructure and from industrial and medical applications. One of the most recently completed projects focused on modernizing Ukraine's management and administrative systems responsible for the disposal of radioactive waste.

  20. Redesign and modernization of radioactive waste administration systems in Ukraine

    International Nuclear Information System (INIS)

    Nieder-Westermann, Gerald H.; Walther, Thorsten; Krone, Juergen

    2016-01-01

    The European Commission (EC) has undertaken a series of projects to render assistance to Ukraine in modernizing and redesigning the Ukrainian approach to the administration, management and ultimately disposal of all forms of radioactive waste, including waste associated with the Chornobyl accident as well as waste generated as part of the Ukrainian energy infrastructure and from industrial and medical applications. One of the most recently completed projects focused on modernizing Ukraine's management and administrative systems responsible for the disposal of radioactive waste.

  1. Indexes to Nuclear Regulatory Commission issuances, January 1, 1986-- December 31, 1990

    International Nuclear Information System (INIS)

    1992-11-01

    Digests and indexes for issuances of the commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. The information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index; and facility index

  2. Environmental monitoring and independent analysis: the experience of the local information commission in Cadarache

    International Nuclear Information System (INIS)

    Foucher, M.

    2010-01-01

    The 2006 Act on 'Open Access to Information and Nuclear Safety' provides free access to nuclear installations data and submits nuclear facilities to an independent administrative authority, the ASN (French Nuclear Safety Authority). A local information committee (CLI - Commission locale d'informations) has been set up for each nuclear facility. It includes all the parties involved and may commission expert studies and environmental measurement tests from independent laboratories. Prompted by environmental organizations, the Cadarache CLI commissioned a CRIIRAD (Commission de Recherche et d'Informations Independantes sur la Radioactivite) fact-finding survey in 2008-2009 to evaluate the environmental impact of the CEA/Cadarache installations since they were created. This study points to a moderate present impact, though a lack of data makes it impossible to reconstruct environmental impact prior to 1979. A set of guidelines are put forward to assess the past impact in greater detail and to lessen the current impact even further. Following this study, additional steps to minimize this impact will be taken by CEA/Cadarache inside the facilities, and by the relevant LCI outside the installations. Developing independent expert skills is a major challenge for CLIs to gain better knowledge of nuclear activities and improve their local management. (author)

  3. Atomic Energy Commission (Amendment) Law, 1993

    International Nuclear Information System (INIS)

    1993-02-01

    The Atomic Energy Commission (Amendment) Law, 1993 (P.N.D.C.L. 308) seeks to amend the Atomic Energy Commission Act of 1963 (Act 204) so as to provide for the establishment of a Radiation Protection Board and other institutes under the Ghana Atomic Energy Commission. The Law further repeats the Atomic Energy Commission (Amendment) Law of 1982 (P.N.D.C.L. 37). (EAA)

  4. 47 CFR 68.602 - Sponsor of the Administrative Council for Terminal Attachments.

    Science.gov (United States)

    2010-10-01

    ... Attachments. (a) The Telecommunications Industry Association (TIA) and the Alliance for Telecommunications... 47 Telecommunication 3 2010-10-01 2010-10-01 false Sponsor of the Administrative Council for Terminal Attachments. 68.602 Section 68.602 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED...

  5. The Central European Permian Basins; Rheological and structural controls on basin history and on inter-basin connectivity

    NARCIS (Netherlands)

    Smit, Jeroen; van Wees, Jan-Diederik; Cloetingh, Sierd

    2014-01-01

    We analyse the relative importance of the major crustal-scale fault zones and crustal architecture in controlling basin formation, deformation and the structural connections between basins. The North and South Permian Basins of Central Europe are usually defined by the extend of Rotliegend

  6. Comparative Research on River Basin Management in the Sagami River Basin (Japan and the Muda River Basin (Malaysia

    Directory of Open Access Journals (Sweden)

    Lay Mei Sim

    2018-05-01

    Full Text Available In the world, river basins often interwoven into two or more states or prefectures and because of that, disputes over water are common. Nevertheless, not all shared river basins are associated with water conflicts. Rivers in Japan and Malaysia play a significant role in regional economic development. They also play a significant role as water sources for industrial, domestic, agricultural, aquaculture, hydroelectric power generation, and the environment. The research aim is to determine the similarities and differences between the Sagami and Muda River Basins in order to have a better understanding of the governance needed for effectively implementing the lessons drawn from the Sagami River Basin for improving the management of the Muda River Basin in Malaysia. This research adopts qualitative and quantitative approaches. Semi-structured interviews were held with the key stakeholders from both basins and show that Japan has endeavored to present policy efforts to accommodate the innovative approaches in the management of their water resources, including the establishment of a river basin council. In Malaysia, there is little or no stakeholder involvement in the Muda River Basin, and the water resource management is not holistic and is not integrated as it should be. Besides that, there is little or no Integrated Resources Water Management, a pre-requisite for sustainable water resources. The results from this comparative study concluded that full support and participation from public stakeholders (meaning the non-government and non-private sector stakeholders is vital for achieving sustainable water use in the Muda River Basin. Integrated Water Resources Management (IWRM approaches such as the introduction of payments for ecosystems services and the development of river basin organization in the Muda River Basin should take place in the spirit of political willingness.

  7. Bioethics commission to review gene patenting

    Energy Technology Data Exchange (ETDEWEB)

    Rothenburg, L.

    1995-12-01

    In October, in an unexpected development, U.S. President Bill Clinton created a national ethics advisory board, the National Bioethics Advisory Commission (NBAC, Washington, DC), to study both research ethics and the management and use of genetic information. Of particular interest to biotechnology companies and researchers is the fact that the commission`s brief encompasses issues about human gene patenting, a subject not contained in earlier proposals for the commission.

  8. The cost of noncooperation in international river basins

    Science.gov (United States)

    Tilmant, A.; Kinzelbach, W.

    2012-01-01

    In recent years there has been a renewed interest for water supply enhancement strategies in order to deal with the exploding demand for water in some regions, particularly in Asia and Africa. Within such strategies, reservoirs, especially multipurpose ones, are expected to play a key role in enhancing water security. This renewed impetus for the traditional supply-side approach to water management may indeed contribute to socioeconomic development and poverty reduction if the planning process considers the lessons learned from the past, which led to the recommendations by the World Commission on Dams and other relevant policy initiatives. More specifically, the issues dealing with benefit sharing within an efficient and equitable utilization of water resources are key elements toward the successful development of those river basins. Hence, there is a need for improved coordination and cooperation among water users, sectors, and riparian countries. However, few studies have explicitly tried to quantify, in monetary terms, the economic costs of noncooperation, which we believe to be important information for water managers and policy makers, especially at a time when major developments are planned. In this paper we propose a methodology to assess the economic costs of noncooperation when managing large-scale water resources systems involving multiple reservoirs, and where the dominant uses are hydropower generation and irrigated agriculture. An analysis of the Zambezi River basin, one of the largest river basins in Africa that is likely to see major developments in the coming decades, is carried out. This valuation exercise reveals that the yearly average cost of noncooperation would reach 350 million US$/a, which is 10% of the annual benefits derived from the system.

  9. Indexes to Nuclear Regulatory Commission Issuances, January--June 1997

    International Nuclear Information System (INIS)

    1997-01-01

    This report indexes the issuances heard and ruled upon from January through June 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Information provided for each case includes the case name, full test reference, issuance number, issues raised by appellants, legal citations, facility name and docket number, subject matter of issues and/or rulings, type of hearing, and type of issuance. Each issuance is displayed in one or more of five separate formats: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index

  10. Indexes to Nuclear Regulatory Commission Issuances, January--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This report indexes the issuances heard and ruled upon from January through June 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Information provided for each case includes the case name, full test reference, issuance number, issues raised by appellants, legal citations, facility name and docket number, subject matter of issues and/or rulings, type of hearing, and type of issuance. Each issuance is displayed in one or more of five separate formats: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index.

  11. Radioactive Waste Repositories Administration - SURAO

    International Nuclear Information System (INIS)

    Kucerka, M.

    1998-01-01

    The Atomic Act specifies, among other things, responsibilities of the government in the field of safe disposal of radioactive wastes. To satisfy this responsibility, the Ministry of Industry and Trade has established the Radioactive Waste Repositories Administration (SURAO). SURAO's major responsibilities include: (a) the preparation, construction, commissioning, operation, and decommissioning of radioactive waste repositories and the monitoring of their environmental impacts; (b) radioactive waste management; (c) spent or irradiated nuclear fuel processing into a form suitable for storage/disposal or reuse; (d) record-keeping of received radioactive wastes and their producers; (e) administration of fund transfers as stipulated by the Atomic Act, Article 27; (f) development of proposals for specification of fees to be paid to the Nuclear Account; (g) responsibility for and coordination of research and development in the field of radioactive waste handling and management; (h) supervision of licensees' margin earmarked for the decommissioning of their facilities; (i) providing services in radioactive waste handling and management; (j) handling and management of radioactive wastes that have been transferred to the Czech Republic from abroad and cannot be sent back; (k) interim administration of radioactive wastes that have become state property. The Statute of the Administration is reproduced in full. (P.A.)

  12. Indexes to Nuclear Regulatory Commission issuances, January-June 1984. Vol. 19, Index 2

    International Nuclear Information System (INIS)

    1984-11-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. The information elements are displayed in one or more of five separate formats: case name index, digests and headers, legal citations index, subject index, and facility index

  13. The Lhc beam commissioning

    International Nuclear Information System (INIS)

    Redarelli, S.; Bailey, R.

    2008-01-01

    The plans for the Lhc proton beam commissioning are presented. A staged commissioning approach is proposed to satisfy the request of the Lhc experiments while minimizing the machine complexity in early commissioning phases. Machine protection and collimation aspects will be tackled progressively as the performance will be pushed to higher beam intensities. The key parameters are the number of bunches, k b , the proton intensity pe bunch, N, and the β in the various interaction points. All together these parameters determine the total beam power and the complexity of the machine. We will present the proposed trade off between the evolution of these parameters and the Lhc luminosity performance.

  14. Introduction: Geomorphic studies of the storm and flood of November 3-5, 1985, in the upper Potomac and Cheat River basins: Chapter A in Geomorphic studies of the storm and flood of November 3-5, 1985, in the upper Potomac and Cheat River basins in West Virginia and Virginia

    Science.gov (United States)

    Jacobson, Robert B.

    1993-01-01

    The heavy rains of November 3-5, 1985, produced record floods and extensive landsliding in the Potomac and Cheat River basins in West Virginia and Virginia (pl. 1). Although rainfall intensity was moderate, the storm covered a very large area and produced record floods for basins in the size range of 1000-10,000 km2. In addition, thousands of landslides were triggered on slopes underlain by shale bedrock. The total social cost of the storm amounted to 70 lives lost and an estimated $1.3 billion in damage to homes, businesses, roads, and productive land in West Virginia and Virginia (Federal Emergency Management Agency (FEMA) 1985a, b). These extreme costs were incurred despite the fact that the affected area is sparsely populated. To understand the origins and geomorphic effects of the 1985 storm, studies were undertaken by the U.S. Geological Survey, University of Maryland, West Virginia University, Cornell University, University of Virginia, The Johns Hopkins University, and Carleton College. Personnel were also consulted from the National Weather Service, Nuclear Regulatory Commission, U.S. Army Corps of Engineers, Soil Conservation Service, and Interstate Commission on the Potomac River basin. This cooperative effort serves to document the effects of the storm as an example of an extreme geomorphic event in the central Appalachian Mountains. The following chapters comprise observations and preliminary analyses for some of the observed phenomena. Subsequent publications by the contributors to this volume will expand the scope of this research.

  15. Red River flooding, short-term measures : interim report to the International Red River Basin Task Force to the International Joint Commission

    International Nuclear Information System (INIS)

    1997-12-01

    The 1997 flood of the Red River Basin was one of the worst in recorded history. The basin covers 45,000 square miles and includes portions of South Dakota, North Dakota, Minnesota and Manitoba. This report of a special task force provides an overview of the environmental impacts of the 1997 flood and recommends a series of strategies to prevent or reduce future flood damage in the Basin. For example, within Manitoba, more than 550 containers that held hazardous materials were retrieved from the Red River. The contents of the containers which included propane, heating fuel, petroleum products, fire-fighting foam, tar, alcohol, solvents, corrosive liquids, polyester resin, paint, and pesticides, made their way into the floodwaters. Estimates of the amount of fuel oil that spilled in Manitoba are not available, but some 15,000 gallons of gasoline spilled from service stations in Breckenridge, Minnesota. The precursors that lead to the severe flooding in 1997 included heavy precipitation and higher than average temperatures that created less than ideal melt conditions. Since 1989, weekly maps of snow and water in the Canadian prairies have been produced because knowledge of the spatial distribution and amount of snow cover during the winter is important for forecasting spring water supply conditions. The Task Force made 40 recommendations that should be initiated within the short term. One of the recommendations was to remove or secure hazardous materials stored in the flood plain. 3 tabs., 4 figs

  16. Drainage basins features and hydrological behaviour river Minateda basin

    International Nuclear Information System (INIS)

    Alonso-Sarria, F.

    1991-01-01

    Nine basin variables (shape, size and topology) have been analyzed in four small basins with non-permanent run off (SE of Spain). These geomorphological variables have been selected for their high correlation with the Instantaneous unit hydrograph parameters. It is shown that the variables can change from one small basin to another within a very short area; because of it, generalizations about the behaviour of the run off are not possible. In conclusion, it is stated that the variations in geomorphological aspects between different basins, caused mainly by geological constraints, are a very important factor to be controlled in a study of geoecological change derived from climatic change

  17. Nuclear Regulatory Commission 1989 Information Digest

    International Nuclear Information System (INIS)

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  18. RESERVES IN WESTERN BASINS PART IV: WIND RIVER BASIN

    Energy Technology Data Exchange (ETDEWEB)

    Robert Caldwell

    1998-04-01

    Vast quantities of natural gas are entrapped within various tight formations in the Rocky Mountain area. This report seeks to quantify what proportion of that resource can be considered recoverable under today's technological and economic conditions and discusses factors controlling recovery. The ultimate goal of this project is to encourage development of tight gas reserves by industry through reducing the technical and economic risks of locating, drilling and completing commercial tight gas wells. This report is the fourth in a series and focuses on the Wind River Basin located in west central Wyoming. The first three reports presented analyses of the tight gas reserves and resources in the Greater Green River Basin (Scotia, 1993), Piceance Basin (Scotia, 1995) and the Uinta Basin (Scotia, 1995). Since each report is a stand-alone document, duplication of language will exist where common aspects are discussed. This study, and the previous three, describe basin-centered gas deposits (Masters, 1979) which contain vast quantities of natural gas entrapped in low permeability (tight), overpressured sandstones occupying a central basin location. Such deposits are generally continuous and are not conventionally trapped by a structural or stratigraphic seal. Rather, the tight character of the reservoirs prevents rapid migration of the gas, and where rates of gas generation exceed rates of escape, an overpressured basin-centered gas deposit results (Spencer, 1987). Since the temperature is a primary controlling factor for the onset and rate of gas generation, these deposits exist in the deeper, central parts of a basin where temperatures generally exceed 200 F and drill depths exceed 8,000 feet. The abbreviation OPT (overpressured tight) is used when referring to sandstone reservoirs that comprise the basin-centered gas deposit. Because the gas resources trapped in this setting are so large, they represent an important source of future gas supply, prompting studies

  19. Canada's Response to the Recommendations in the Tenth Biennial Report on Great Lakes Water Quality of the International Joint Commission

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The Government of Canada and Ontario are currently renegotiating the Canada-Ontario Agreement Respecting the Great Lakes Basin Ecosystem (COA). They are committed to restoring and maintaining the basin's chemical, physical and biological integrity and ensuring that it has a healthy, sustainable future. The COA has established a strategic framework for coordinated federal-provincial responsibilities regarding the Great Lakes basin ecosystem. This document presents responses to the recommendations of the International Joint Commission's (IJC) Tenth Biennial Report on how to improve the performance and effectiveness of government programs such as the Great Lakes Water Quality Agreement. According to the IJC, there are many challenges ahead, including: cleanup of Canadian Areas of Concern; controlling and preventing the further introduction of exotic species; mitigating the impact of rapid urban growth on environmental conditions throughout the basin; and reducing contaminants transported in the atmosphere over long distances to the Great Lakes. This document presented the government's responses to each of the following IJC recommendations regarding remedial action plans, threats to human health with respect to consumption of fish, contaminated sediment, airborne toxic substances, Great Lakes binational toxics strategy, land use, alien invasive species, and information and data management. IJC also recommended that indicators should be reported regarding whether the Great Lakes surface waters are suitable for drinking, swimming and whether fish are edible.

  20. The Teaching of Dr. W. E. Deming and the Performance Domains of the National Commission for the Principalship.

    Science.gov (United States)

    House, Jess E.

    This paper considers the total-quality-management teachings of W. E. Deming as a basis for the redesign of educational-administration preparation programs. The performance domains developed by the National Commission for the Principalship (jointly sponsored by the National Association of Secondary School Principals and the National Association of…

  1. Umatilla Basin Natural Production Monitoring and Evaluation; 1998-2002 Summary Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2004-07-01

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (WWNPME) was funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P. L. 96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) under the Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPME). Chapter One provides an overview of the entire report and shows how the objectives of each statement of work from 1999, 2000, 2001, and 2002 contract years are organized and reported. This chapter also provides background information relevant to the aquatic resources of the Umatilla River Basin. (Figure 1-1, Tables 1-1 and 1-2). Data and reports from this and previous efforts are available on the CTUIR website http://www.umatilla.nsn.us. This project was one of several subprojects of the Umatilla River Basin Fisheries Restoration Master Plan (CTUIR 1984, ODFW 1986) orchestrated to rehabilitate salmon and steelhead runs in the Umatilla River Basin. Subprojects in additions to this project include: Watershed Enhancement and Rehabilitation; Hatchery Construction and Operation; Hatchery Monitoring and Evaluation; Satellite Facility Construction and Operations for Juvenile Acclimation and Adult Holding and Spawning; Fish Passage Construction and Operation; Juvenile and Adult Passage Facility Evaluations; Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Basin, and Flow Augmentation to Increase Stream Flows below Irrigation Diversions.

  2. Investigation of the suspected presence of solid hydrocarbon in bedded salt samples from the Palo Duro Basin, Texas

    International Nuclear Information System (INIS)

    1985-10-01

    This report contains laboratory test results for two bedded salt samples from the Grabbe No. 1 (PD-2) Well of the Palo Duro Basin, Texas. This study was commissioned to determine whether or not solid hydrocarbons exist in bedded salt samples in the Palo Duro Basin. Laboratory investigations include electron microprobe examinations on polished thin sections and optical examinations and chemical tests on insoluble residues of the salt samples. No direct evidence was found that identifiable solid hydrocarbons are present in either sample of the bedded salt core. The total carbon content of the two salt samples was measured yielding 0.016 and 0.022 weight percent carbon. Detailed microscopic analyses showed that the carbon in the samples was associated with calcite, clays, and the epoxy resin used in sample preparation

  3. Commissioning of the LHC Cryogenic System Subsystems Cold Commissioning in Preparation of Full Sector Tests

    CERN Document Server

    Serio, L; Ferlin, G; Gilbert, N; Gruehagen, Henning; Knoops, S; Parente, C; Sanmartí, M

    2006-01-01

    The cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distributed around the 26.7-km circumference ring located in a deep underground tunnel. The status of the cryogenic system commissioning is presented together with the experience gained in operating and commissioning it.

  4. Indexes to Nuclear Regulatory Commission issuances, July--September 1992

    International Nuclear Information System (INIS)

    1993-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: 1. Case Name Index: The case name index is an alphabetical arrangement of the case names of the issuances. Each case name is followed by the type of hearing, the type of issuance, docket number, issuance number, and full text reference. 2. Digests and Headers: The headers and digests are presented in issuance number order as follows: the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The header identifies the issuance by issuance number, case name, facility name, docket number, type of hearing, date of issuance, and type of issuance. 3. Legal Citations Index: This index is divided into four parts and consists of alphabetical or alpha-numerical arrangements of Cases, Regulations, Statutes, and Others. These citations are listed as given in the issuances. Changes in regulations and statutes may have occurred to cause changes in the number or name and/or applicability of the citation. It is therefore important to consider the date of the issuance. 4. Subject Index: Subject words and/or phrases, arranged alphabetically, indicate the issues and subjects covered in the issuances. 5. Facility Index: The index consists of an alphabetical arrangement of facility names from the issuance. The name is followed by docket number, type of hearing, data, type of issuance, issuance number, and full text reference

  5. Commissioning plans for SSC linac

    International Nuclear Information System (INIS)

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  6. Regional Cooperation Efforts in the Mekong River Basin: Mitigating river-related security threats and promoting regional development

    Directory of Open Access Journals (Sweden)

    Susanne Schmeier

    2009-01-01

    Full Text Available The development of international rivers is often perceived as leading to conflicts or even water wars. However, as the development of the Mekong River shows, cooperation has not only prevailed in the last decades, but River Basin Organizations (RBOs, established to mitigate river-related conflicts and/or develop the river basin, have also contributed to the emergence of more general cooperation structures, mainly by creating spill-over effects in other issue-areas, bringing cooperation to policy fields beyond the river itself. This article assesses the contribution of the Mekong River Commission (MRC and the Greater Mekong Sub-Region (GMS to the sustainable development of the Mekong Region as well as to the promotion of regional cooperation in mainland South-East Asia in general. --- Die Entwicklung grenzüberschreitender Flüsse wird oft mit Konflikten oder gar Kriegen um Wasser assoziiert. Wie jedoch die Entwicklung im Mekong-Becken zeigt, waren die vergangenen Jahrzehnte nicht nur von Kooperation gezeichnet, sondern Flussbeckenorganisationen konnten außerdem dazu beitragen, weitreichendere Kooperationsstrukturen zu entwickeln, die sich auf andere Politikfelder ausdehnen. Dieser Artikel beschäftigt sich mit dem Beitrag der Mekong River Commission (MRC und der Greater Mekong Sub-Region (GMS zur nachhaltigen Entwicklung in der Mekong Region sowie zur Förderung allgemeiner regionaler Kooperation im Festländischen Südostasien.

  7. A fate model for nitrogen dynamics in the Scheldt basin

    Science.gov (United States)

    Haest, Pieter Jan; van der Kwast, Johannes; Broekx, Steven; Seuntjens, Piet

    2010-05-01

    The European Union (EU) adopted the Water Framework Directive (WFD) in 2000 ensuring that all aquatic ecosystems meet ‘good ecological status' by 2015. However, the large population density in combination with agricultural and industrial activities in some European river basins pose challenges for river basin managers in meeting this status. The EU financed AQUAREHAB project (FP7) specifically examines the ecological and economic impact of innovative rehabilitation technologies for multi-pressured degraded waters. For this purpose, a numerical spatio-temporal model is developed to evaluate innovative technologies versus conventional measures at the river basin scale. The numerical model describes the nitrogen dynamics in the Scheldt river basin. Nitrogen is examined since nitrate is of specific concern in Belgium, the country comprising the largest area of the Scheldt basin. The Scheldt basin encompasses 20000 km2 and houses over 10 million people. The governing factors describing nitrogen fluxes at this large scale differ from the field scale with a larger uncertainty on input data. As such, the environmental modeling language PCRaster was selected since it was found to provide a balance between process descriptions and necessary input data. The resulting GIS-based model simulates the nitrogen dynamics in the Scheldt basin with a yearly time step and a spatial resolution of 1 square kilometer. A smaller time step is being evaluated depending on the description of the hydrology. The model discerns 4 compartments in the Scheldt basin: the soil, shallow groundwater, deep groundwater and the river network. Runoff and water flow occurs along the steepest slope in all model compartments. Diffuse emissions and direct inputs are calculated from administrative and statistical data. These emissions are geographically defined or are distributed over the domain according to land use and connectivity to the sewer system. The reactive mass transport is described using

  8. 17 CFR 201.57 - Commission review.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission review. 201.57... Regulations Pertaining to the Equal Access to Justice Act § 201.57 Commission review. In accordance with the... Division of the Commission may seek review of the initial decision on the fee application, or the...

  9. Commissioning of ATLAS

    CERN Document Server

    Thomas, J

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focussing on combined running and track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  10. ATF2 Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  11. ATF2 COMMISSIONING

    CERN Document Server

    Seryi, A; Parker, B; Schulte, D; Delahaye, J P; Tomas, R; Zimmermann, F; Wolski, A; Elsen, E; Sanuki, T; Gianfelice-Wendt, E; Ross, M; Wendt, M; Takahashi, T; Bai, S; Gao, J; Bolzon, B; Geffroy, N; Jeremie, A; Apsimon, R; Burrows, P; Constance, B; Perry, C; Resta-Lopez, J; Swinson, C; Araki, S; Aryshev, A; Hayano, H; Honda, Y; Kubo, K; Kume, T; Kuroda, S; Masuzawa, M; Naito, T; Okugi, T; Sugahara, R; Tauchi, T; Terunuma, N; Urakawa, J; Yokoya, K; Iwashita, Y; Sugimoto, T; Heo, A Y; Kim, E S; Kim, H S; Bambade, P; Renier, Y; Rimbault, C; Huang, J Y; Kim, S H; Park, Y J; Hwang, W H; Blair, G; Boogert, S; Karataev, P; Molloy, S; Amann, J; Bellomo, P; Lam, B; McCormick, D; Nelson, J; Paterson, E; Pivi, M; Raubenheimer, T; Spencer, C; Wang, M H; White, G; Wittmer, W; Woodley, M; Yan, Y; Zhou, F; Angal-Kalinin, D; Jones, J; Lyapin, A; Scarfe, A; Kamiya, Y; Komamiya, S; Oroku, M; Suehara, T; Yamanaka, T

    2010-01-01

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  12. Joint Commission

    Science.gov (United States)

    ... for the latest publication of The Joint Commission Journal on Quality and Patient Safety (JQPS). . How We Work Process improvement program breeds quality culture, empowers staff An article in Quality Progress, June ...

  13. British Columbia Utilities Commission 2001 annual report

    International Nuclear Information System (INIS)

    2002-06-01

    The main responsibility of the British Columbia Utilities Commission is to regulate energy utilities under its jurisdiction to ensure that energy rates are fair and that utility operators in the province provide safe, adequate and secure service to their customers. The Commission also approves the construction of new facilities planned by utilities. It also participates in the review of utility and energy projects under the Environmental Assessment Act. Several successes were achieved in 2001 as the utility implemented its first performance plan. Oral public hearings were held for applications by Pacific Northern Gas and by Pembina Pipelines, owners of the common carrier oil pipeline from Taylor to Kamloops. A review of BC Gas' rate design to apportion utility revenue requirements fairly to different classes of customers was successfully achieved by a negotiated settlement process. In 2001, there was also a high level of proposed mergers, acquisitions and divestitures. Duke Energy Corporation's share acquisition of Westcoast Energy's two affiliated gas utilities was approved. BC Gas' application to divest its customer care activities to a joint venture company with Enbridge was also reviewed, and an oral hearing was held to review a West Kootenay Power application to sell its Kootenay River hydroelectric generation assets to Columbia Basin Trust and the Columbia Power Corp. In this case, the decision rendered was that the sale terms had to be changed so that customers could share the proceeds. The utility therefore, decided not to proceed with the sale under these conditions. The BC Hydro legislated rate freeze, which was due to expire on September 30, 2001, was extended for an additional 18 months to allow the new provincial government time to implement a new energy policy. The new energy policy is expected to give the province an energy advantage by facilitating growth and diversification in energy production while providing competition and more choice for

  14. Contrasting basin architecture and rifting style of the Vøring Basin, offshore mid-Norway and the Faroe-Shetland Basin, offshore United Kingdom

    Science.gov (United States)

    Schöpfer, Kateřina; Hinsch, Ralph

    2017-04-01

    The Vøring and the Faroe-Shetland basins are offshore deep sedimentary basins which are situated on the outer continental margin of the northeast Atlantic Ocean. Both basins are underlain by thinned continental crust whose structure is still debated. In particular the nature of the lower continental crust and the origin of high velocity bodies located at the base of the lower crust are a subject of discussion in recent literature. Regional interpretation of 2D and 3D seismic reflection data, combined with well data, suggest that both basins share several common features: (i) Pre-Cretaceous faults that are distributed across the entire basin width. (ii) Geometries of pre-Jurassic strata reflecting at least two extensional phases. (iii) Three common rift phases, Late Jurassic, Campanian-Maastrichtian and Palaeocene. (iv) Large pre-Cretaceous fault blocks that are buried by several kilometres of Cretaceous and Cenozoic strata. (iii). (v) Latest Cretaceous/Palaeocene inversion. (vi) Occurrence of partial mantle serpentinization during Early Cretaceous times, as proposed by other studies, seems improbable. The detailed analysis of the data, however, revealed significant differences between the two basins: (i) The Faroe-Shetland Basin was a fault-controlled basin during the Late Jurassic but also the Late Cretaceous extensional phase. In contrast, the Vøring Basin is dominated by the late Jurassic rifting and subsequent thermal subsidence. It exhibits only minor Late Cretaceous faults that are localised above intra-basinal and marginal highs. In addition, the Cretaceous strata in the Vøring Basin are folded. (ii) In the Vøring Basin, the locus of Late Cretaceous rifting shifted westwards, affecting mainly the western basin margin, whereas in the Faroe-Shetland Basin Late Cretaceous rifting was localised in the same area as the Late Jurassic phase, hence masking the original Jurassic geometries. (iii) Devono-Carboniferous and Aptian/Albian to Cenomanian rift phases

  15. Indexes to Nuclear Regulatory Commission Issuances, January-March 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors Denials (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility), Full text reference (volume and pagination), Issuance number, Issues raised by appellants, Legal citations (cases, regulations, and statutes), Name of facility, Docket number, Subject matter of issues and/or rulings, Type of hearing (for construction permit, operating license, etc.), and Type of issuance

  16. Spatial Misfit in Participatory River Basin Management: Effects on Social Learning, a Comparative Analysis of German and French Case Studies

    Directory of Open Access Journals (Sweden)

    Ilke Borowski

    2008-06-01

    Full Text Available With the introduction of river basin management, as prescribed by the European Water Framework Directive (WFD, participatory structures are frequently introduced at the hydrological scale without fully adapting them to the decision-making structure. This results in parallel structures and spatial misfits within the institutional settings of river basin governance systems. By analyzing French and German case studies, we show how social learning (SL is impeded by such misfits. We also demonstrate that river basin-scale institutions or actors that link parallel structures are essential for promoting river basins as management entities, and for encouraging SL between actors at the river basin scale. In the multi-scale, multi-level settings of river basin governance, it is difficult to fully exclude spatial misfits. Thus, it is important to take our insights into account in the current transition of water management from the administrative to the hydrological scale to get the greatest benefit from SL processes.

  17. National Bioethics Commissions as Educators.

    Science.gov (United States)

    Lee, Lisa M

    2017-05-01

    As has become tradition, executive directors of United States' presidential bioethics committees offer reflections about their experience shortly after the orderly shutdown of the commission staff. After the records are filed according to government records regulations; after all the staff members, who are hired into temporary positions that must be renewed every two years, have secured permanent employment; after preparations are made to ensure that the next commission staff (should there be one) has a budget and standard operating procedures in order to begin its work in a timely manner; after the lights are turned out for the last time, the executive director makes the final climb up the stairs into the sunlight and reflects on the whirlwind. There is much about my work with the Presidential Commission for the Study of Bioethical Issues that deserves comment, but one aspect of the commission that has been especially valuable to me is its work to educate the nation on bioethical issues. This is, moreover, a contribution in which the commission staff was central, and it is one that, as an ethics educator myself, I will cherish deeply. © 2017 The Hastings Center.

  18. Institutions and Societal Impacts of Climate in the Lower Colorado and San Pedro Basins of the U.S.-Mexico Border Region

    Science.gov (United States)

    Varady, R. G.; Wilder, M.; Morehouse, B. J.; Garfin, G. M.

    2007-05-01

    The U.S. Southwest and Mexico border region feature two prominent river basins, the Colorado and Rio Grande, and ecologically important sub-basins such as the San Pedro. The area within which these transboundary basins lie is characterized by overall aridity and high climatic variability over seasonal to decadal and longer time scales. Throughout human occupation, numerous and diverse strategies for buffering climate impacts have emerged. The most notable response has been an increasingly complex system of institutions and structures designed to buffer water scarcity. The Colorado River Compact, and the laws governing allocation of waters from the Rio Grande River, together with the dams, hydropower generators, canals and other engineered features, represent two of the most complex systems. Drought nevertheless remains a looming specter across much of the binational border region. Institutional mechanisms for responding to drought range from awareness-raising and capacity-building efforts, to implementation of formal drought plans, to storing water to make up for deficits, and water conservation rules that become increasingly stringent as drought intensifies. A number of formal and informal binational institutions operate in the region. Some are venerable, like the century-old International Boundary and Water Commission (IBWC) and its Mexican counterpart the Comision Internacional de Limites y Agua (CILA). Others, like the Border Environment Cooperation Commission and the North American Development Bank, were created in the mid-1990s with the North American Free Trade Agreement. These institutions, both domestic and transnational, operate in a complex binational, bicultural environment with contrasting legal and administrative traditions. Under such constraints, they manage water resources and ecosystems and attempt to improve water and sanitation infrastructure in the context of deep and extended drought. But in spite of their efforts, society and natural habitat

  19. Commissioning of the nuclear power plant

    International Nuclear Information System (INIS)

    Furtado, P.M.; Rolf, F.

    1984-01-01

    Nuclear Power Plant Angra 2, located at Itaorna Beach-Angra dos Reis is the first plant of the Brazilian-German Agreement to be commissioned. The Nuclear Power Plant is a pressurized water reactor rated at 3765 Mw thermal/1325 Mw electrical. For commissioning purpose the plant is divided into 110 systems. Plant commissioning objective is to demonstrate the safe and correct operation of each plan component, system and of the whole plant in agreement with design conditions, licensing requirements and contractual obligations. This work gives a description of plant commissioning objectives, activities their time sequence, and documentation. (Author) [pt

  20. Molr - A delegation framework for accelerator commissioning

    CERN Document Server

    Valliappan, Nachiappan

    2017-01-01

    Accelerator commissioning is the process of preparing an accelerator for beam operations. A typical commissioning period at CERN involves running thousands of tests on many complex systems and machinery to ensure smooth beam operations and correct functioning of the machine protection systems. AccTesting is a software framework which helps orchestrate the commissioning of CERN’s accelerators and it’s equipment systems. This involves running and managing tests provided by various commissioning tools and analyzing their outcomes. Currently, AccTesting only supports a specific set of commissioning tools. In this project, we aim to widen the spectrum of commissioning tools supported by AccTesting by developing a generic and programmable integration framework called Molr, which would enable the integration of more commissioning tools with AccTesting. In this report, we summarize the work done during the summer student project and lay out a brief overview of the current status and next steps for Molr.

  1. The Industry Commission inquiry into charitable organisations.

    Science.gov (United States)

    Suter, K

    1996-01-01

    The Industry Commission has carried out Australia's largest inquiry into charities. It was, from the point of view of charities, an unsatisfactory operation, all the more so since it was not clear why the task had been given to the commission. This article examines the commission's work in three ways: the overall relationship between government and charities; the commission's proposed major reforms; and the minor reforms.

  2. Nuclear Regulatory Commission issuances, October 1993

    International Nuclear Information System (INIS)

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners' motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners' have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission's Memorandum and Order are included

  3. Indexes to Nuclear Regulatory Commission issuances, January--June 1995. Volume 41, Index 2

    International Nuclear Information System (INIS)

    1995-09-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the directors' Decisions (DD), and the Denials of Petitions for rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. The information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index; and facility index

  4. Indexes to Nuclear Regulatory Commission issuances, January-March 1984. Volume 19, Index 1

    International Nuclear Information System (INIS)

    1984-01-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Appeal Panel, the Atomic Safety and Licensing Board Panel, the Administrative Law Judge, the Directors' Decisions, and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats: Case Name Index, Digests and Headers, Legal Citations Index, Subject Index, and Facility Index

  5. Indexes to Nuclear Regulatory Commission Issuances, July--December 1993. Volume 38, Index 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Digests and Headers; Legal Citations Index; Subject Index, and Facility Index.

  6. Indexes to Nuclear Regulatory Commission issuances, January--June 1995. Volume 41, Index 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the directors` Decisions (DD), and the Denials of Petitions for rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. The information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index; and facility index.

  7. Amendment of the atomic energy basic law and other related laws and establishment of the nuclear safety commission

    International Nuclear Information System (INIS)

    Ochi, Kenji

    1978-01-01

    The Atomic Energy Basic Law and related several laws were amended in the recent diet session. The amendment of the laws was requested after the radiation leakage from nuclear-powered ship ''Mutsu''. The reform of administrative system of atomic energy development and utilization are consisted of two important points: one is to establish the Nuclear Safety Commission for strengthening nuclear safety administration, and the other is to give an authority to each ministry or agency to regulate nuclear power reactor from the establishment to operation according to its original mission. (author)

  8. Towards an Administrative Procedure of the European Union: Issues and Prospects

    Directory of Open Access Journals (Sweden)

    Mihaela V. Cărăuşan

    2016-12-01

    Full Text Available This article aims at identifying European administrative law principles by mapping the proposal of the European Parliament and assessing the existing principles in the European Union’s rules and jurisprudence. The first section analyses the difficulties to pass from the well-known sectoral procedures to a common procedural framework. It shows, on the one hand, how fragmented is the administrative EU law, and on the other hand, that European Commission tends to support it by derailing the Parliament’s proposal. The second section, is mapping the administrative law principles through an inventory of the Treaties, the Charter, the soft law and the jurisprudence. The last section proposes an assessment of the draft Regulation on the administrative procedure of European Union. The main outcome is that, without the Commission’s involvement the process of making a common administrative procedure for European Union cannot take place.

  9. Manual on quality assurance for installation and commissioning of instrumentation, control and electrical equipment in nuclear power plants

    International Nuclear Information System (INIS)

    1989-01-01

    The present Manual on Quality Assurance (QA) for Installation and Commissioning of Instrumentation, Control and Electrical (ICE) Equipment of Nuclear Power Plants contains supporting material and illustrative examples for implementing basic requirements of the quality assurance programme in procurement, receiving, installation and commissioning of this equipment. The Manual on Quality Assurance for Installation and Commissioning of ICE Equipment is designed to supplement and be consistent with the Guidebook as well as with the IAEA Code and Safety Guides on Quality Assurance. It is intended for the use of managerial staff and QA personnel of nuclear power plant owners or the organizations respectively responsible for the legal, technical, administrative and financial aspects of a nuclear power plant. The information provided in the Manual will also be useful to the inspection staff of the regulatory organization in the planning and performance of regulatory inspections at nuclear power plants

  10. arXiv Medical Physics Commissioning

    CERN Document Server

    Meer, David

    The medical commissioning is an important step to bring a particle gantry into clinical operation for tumour treatments. This involves the parametrization and characterization of all relevant systems including the beam delivery, the patient table, the imaging systems and the connection to all required software components. This article is limited to necessary tasks for the beam delivery system of a pencil beam scanning system. Usually the commissioning starts with the characterization of the unscanned beam and the calibration of the beam energy. The following steps are the parametrization of the scanning system, the commissioning of the beam position monitoring system and characterization of the spot size, all requiring precisions better than 1 mm. The commissioning effort for these tasks depends also on the gantry topology. Finally, the calibration of the dose measurement system ensures that any dose distribution can be delivered with an absolute precision better than 1%.

  11. Atomic Energy Commission Act, 2000 (Act 588)

    International Nuclear Information System (INIS)

    2000-01-01

    Act 588 of the Republic of Ghana entitled, Atomic Energy Commission Act, 2000, amends and consolidates the Atomic Energy Commission Act, 204 of 1963 relating to the establishment of the Atomic Energy Commission. Act 588 makes provision for the Ghana Atomic Energy Commission to establish more institutes for the purpose of research in furtherance of its functions and also promote the commercialization of its research and development results. (E.A.A.)

  12. Using satellite-based rainfall estimates for streamflow modelling: Bagmati Basin

    Science.gov (United States)

    Shrestha, M.S.; Artan, Guleid A.; Bajracharya, S.R.; Sharma, R. R.

    2008-01-01

    In this study, we have described a hydrologic modelling system that uses satellite-based rainfall estimates and weather forecast data for the Bagmati River Basin of Nepal. The hydrologic model described is the US Geological Survey (USGS) Geospatial Stream Flow Model (GeoSFM). The GeoSFM is a spatially semidistributed, physically based hydrologic model. We have used the GeoSFM to estimate the streamflow of the Bagmati Basin at Pandhera Dovan hydrometric station. To determine the hydrologic connectivity, we have used the USGS Hydro1k DEM dataset. The model was forced by daily estimates of rainfall and evapotranspiration derived from weather model data. The rainfall estimates used for the modelling are those produced by the National Oceanic and Atmospheric Administration Climate Prediction Centre and observed at ground rain gauge stations. The model parameters were estimated from globally available soil and land cover datasets – the Digital Soil Map of the World by FAO and the USGS Global Land Cover dataset. The model predicted the daily streamflow at Pandhera Dovan gauging station. The comparison of the simulated and observed flows at Pandhera Dovan showed that the GeoSFM model performed well in simulating the flows of the Bagmati Basin.

  13. Monitoring and evaluation of smolt migration in the Columbia Basin, Volume II: Evaluation of the 1996 predictions of the run-timing of wild migrant subyearling chinook in the Snake River Basin using Program RealTime.; TOPICAL

    International Nuclear Information System (INIS)

    Skalski, John R.; Townsend, Richard L.; Yasuda, Dean

    1998-01-01

    This project was initiated in 1991 in response to the Endangered Species Act (ESA) listings in the Snake River Basin of the Columbia River Basin. Primary objectives and management implications of this project include: (1)to address the need for further synthesis of historical tagging and other biological information to improve understanding and identify future research and analysis needs; (2)to assist in the development of improved monitoring capabilities, statistical methodologies and software tools to aid management in optimizing operational and fish passage strategies to maximize the protection and survival of listed threatened and endangered Snake River salmon populations and other listed and nonlisted stocks in the Columbia River Basin; (3)to design better analysis tools for evaluation programs; and (4)to provide statistical support to the Bonneville Power Administration and the Northwest fisheries community

  14. Monitoring and evaluation of smolt migration in the Columbia River Basin; Volume 1; Evaluation of the 1995 predictions of the run-timing of wild migrant subyearling chinook in the Snake River Basin using Program RealTime

    International Nuclear Information System (INIS)

    Skalski, John R.; Townsend, Richard L.; Yasuda, Dean

    1997-01-01

    This project was initiated in response to the Endangered Species Act (ESA) listings in the Snake River Basin of the Columbia River Basin. Primary objectives and management implications of the project include: (1)to address the need for further synthesis of historical tagging and other biological information to improve understanding and to help identify future research and analysis needs; (2)to assist in the development of improved monitoring capabilities, statistical methodologies and software tools to assist in optimizing operational and fish passage strategies to maximize the protection and survival of listed threatened and endangered Snake River salmon populations and other listed and nonlisted stocks in the Columbia River Basin; and (3)to design better analysis tools for evaluation programs; and (4)to provide statistical support to the Bonneville Power Administration and the Northwest fisheries community

  15. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Science.gov (United States)

    2013-07-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0159] Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S... Policy. In SRM-SECY-12-0047, ``Revisions to the Nuclear Regulatory Commission Enforcement Policy,'' dated...

  16. Instrumented home energy rating and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  17. Validation studies on indexed sequential modeling for the Colorado River Basin

    International Nuclear Information System (INIS)

    Labadie, J.W.; Fontane, D.G.; Salas, J.D.; Ouarda, T.

    1991-01-01

    This paper reports on a method called indexed sequential modeling (ISM) that has been developed by the Western Area Power Administration to estimate reliable levels of project dependable power capacity (PDC) and applied to several federal hydro systems in the Western U.S. The validity of ISM in relation to more commonly accepted stochastic modeling approaches is analyzed by applying it to the Colorado River Basin using the Colorado River Simulation System (CRSS) developed by the U.S. Bureau of Reclamation. Performance of ISM is compared with results from input of stochastically generated data using the LAST Applied Stochastic Techniques Package. Results indicate that output generated from ISM synthetically generated sequences display an acceptable correspondence with results obtained from final convergent stochastically generated hydrology for the Colorado River Basin

  18. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    Tiziano Camporesi

    Pit commissioning activities The last 4 months have seen various major achievements in hardware commissioning, global data taking, readiness of the DPGs to deal with LHC data flows and alignment and calibration workflows. Since February, the global commissioning has been characterized on the one side by more and more of the final CMS detector becoming available for global readout and triggering and on the other side by consolidation of many of the central software infrastructure and of most of the services infrastructure. The reliability of services like cooling, power, gas has markedly improved with respect to what we observed in the second half of 2007.   Of particular note are the delivery of all low voltage power supplies, the commissioning of the final power distribution, the progressive commissioning ( still ongoing)  of the Detector Safety System and of the associated DCS early warning and alarm system. On the detector side, while already we are used to seeing all of HCAL being exe...

  19. Estimating tectonic history through basin simulation-enhanced seismic inversion: Geoinformatics for sedimentary basins

    Science.gov (United States)

    Tandon, K.; Tuncay, K.; Hubbard, K.; Comer, J.; Ortoleva, P.

    2004-01-01

    A data assimilation approach is demonstrated whereby seismic inversion is both automated and enhanced using a comprehensive numerical sedimentary basin simulator to study the physics and chemistry of sedimentary basin processes in response to geothermal gradient in much greater detail than previously attempted. The approach not only reduces costs by integrating the basin analysis and seismic inversion activities to understand the sedimentary basin evolution with respect to geodynamic parameters-but the technique also has the potential for serving as a geoinfomatics platform for understanding various physical and chemical processes operating at different scales within a sedimentary basin. Tectonic history has a first-order effect on the physical and chemical processes that govern the evolution of sedimentary basins. We demonstrate how such tectonic parameters may be estimated by minimizing the difference between observed seismic reflection data and synthetic ones constructed from the output of a reaction, transport, mechanical (RTM) basin model. We demonstrate the method by reconstructing the geothermal gradient. As thermal history strongly affects the rate of RTM processes operating in a sedimentary basin, variations in geothermal gradient history alter the present-day fluid pressure, effective stress, porosity, fracture statistics and hydrocarbon distribution. All these properties, in turn, affect the mechanical wave velocity and sediment density profiles for a sedimentary basin. The present-day state of the sedimentary basin is imaged by reflection seismology data to a high degree of resolution, but it does not give any indication of the processes that contributed to the evolution of the basin or causes for heterogeneities within the basin that are being imaged. Using texture and fluid properties predicted by our Basin RTM simulator, we generate synthetic seismograms. Linear correlation using power spectra as an error measure and an efficient quadratic

  20. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Multimedia

    D. Acosta

    The commissioning effort is presently addressing two main areas: the commissioning of the hardware components at the pit and the coordination of the activities of the newly constituted Detector Performance groups (DPGs). At point 5, a plan regarding the service cavern and the commissioning of the connections of the off-detector electronics (for the data collection line and trigger primitive generation) to the central DAQ and the central Trigger has been defined. This activity was started early February and will continue until May. It began with Tracker electronics followed so far by HCAL and CSC. The goal is to have by May every detector commission, as much as possible, their data transfer paths from FED to Central DAQ as well as their trigger setups between TPGs and Global Level 1 trigger. The next focus is on connections of front-ends to the service cavern. This depends strongly on the installations of services. Presently the only detector which has its link fibers connected to the off-detector electr...

  1. Columbia River Basin Seasonal Volumes and Statistics, 1928-1989. 1990 Level Modified Streamflows Computed Seasonal Volumes 61-Year Statistics.

    Energy Technology Data Exchange (ETDEWEB)

    A.G. Crook Company

    1993-04-01

    This report was prepared by the A.G. Crook Company, under contract to Bonneville Power Administration, and provides statistics of seasonal volumes and streamflow for 28 selected sites in the Columbia River Basin.

  2. 3-D basin modelling of the Paris Basin: diagenetic and hydrogeologic implications

    International Nuclear Information System (INIS)

    Violette, S.; Goncalves, J.; Jost, A.; Marsily, G. de

    2004-01-01

    A 3-D basin model of the Paris basin is presented in order to simulate through geological times fluid, heat and solute fluxes. This study emphasizes: i) the contribution of basin models to the quantitative hydrodynamic understanding of behaviour of the basin over geological times; ii) the additional use of Atmospheric General Circulation model (AGCM) to provide palaeo-climatic boundaries for a coupled flow and mass transfer modelling, constrained by geochemical and isotopic tracers and; iii) the integration of different types of data (qualitative and quantitative) to better constrain the simulations. Firstly, in a genetic way, basin model is used to reproduce geological, physical and chemical processes occurring in the course of the 248 My evolution of the Paris basin that ought to explain the present-day hydraulic properties at the regional scale. As basin codes try to reproduce some of these phenomena, they should be able to give a plausible idea of the regional-scale permeability distribution of the multi-layered system, of the pre-industrial hydrodynamic conditions within the aquifers and of the diagenesis timing and type of hydrodynamic processes involved. Secondly, climate records archived in the Paris basin groundwater suggest that climate and morphological features have an impact on the hydrogeological processes, particularly during the last 5 My. An Atmospheric General Circulation model is used with a refined spatial resolution centred on the Paris basin to reproduce the climate for the present, the Last Glacial Maximum (21 ky) and the middle Pliocene (3 My). These climates will be prescribed, through forcing functions to the hydrological code with the main objective of understanding the way aquifers and aquitards react under different climate conditions, the period and the duration of these effects. Finally, the Paris basin has been studied for a number of years by different scientific communities, thus a large amount of data has been collected. By

  3. 17 CFR 171.28 - Participation by Commission staff.

    Science.gov (United States)

    2010-04-01

    ... staff. 171.28 Section 171.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION..., Membership Denial and Registration Actions § 171.28 Participation by Commission staff. The Division of.... The Commission shall by order establish a supplementary briefing schedule for the Commission staff and...

  4. Point Lepreau G.S. commissioning management experience

    International Nuclear Information System (INIS)

    Alikhan, S.; Walker, W.J.

    1983-05-01

    This paper shares the experience gained by New Brunswick Power in commissioning its first nuclear plant, with particular emphasis on the management techniques that were developed. Some of the areas discussed include: organization of Nuclear Operations Group responsible for commissioning and its interface with construction; outline and scope of documentation required to define, execute and report commissioning to satisfy the licensing requirements, management techniques developed to implement commissioning; and a summary of lessons learned and recommendations for the future

  5. Integrating Geological map of the Plata Basin and adjacent areas: release Bulletin

    International Nuclear Information System (INIS)

    Preciozzi, F.; Spoturno Pioppo, J.; Medina, E.

    2001-01-01

    During the 1st Meeting of the Geological Surveys of the Southern Cone Countries, held in the city of Porto Alegre (Rio Grande do Sul - Brazil) in November 1995, it was born the idea of ​​a set of activities that it had aimed at developing integration , technical cooperation and scientific exchange between these institutions, resulting in a concrete proposal in order to develop a map of geological, metallogenic and hydrogeological basins of the Parana and Plata integration; which provide the basic information needed for the further development of mineral resources maps approach to groundwater, gold, ornamental stones, industrial minerals and precious stones; the development of exchange activities in the area of ​​the environment and the creation of a data bank of geological and mining of the countries involved in the program. This intention of working together was presented to SGT2, Theme of Geology and Mineral Resources MERCOSUR Commission, at its first meeting, held in Buenos Aires - Argentina, in April 1996, with the aim of transforming it into an official activity of this Commission, time that the delegations of the four States-Party endorsed the proposal. These opportunities were discussed and established parameters and standards for the execution of the works to be developed in the area between the parallel of 14oS and 38oS and meridians 44oW and 68oW (Figure 1), covering approximately 5,800,000 Km2 continental area, scale 1: 2,500,000, covering the entire basin of the River Plate. geological one, one and one hydrogeological mineral resources, plus a database of mineral resources, which serve as a source of information for the map of mineral resources: the generation of three maps was established as a goal. The official name for this project was established Maps

  6. How health care reform can lower the costs of insurance administration.

    Science.gov (United States)

    Collins, Sara R; Nuzum, Rachel; Rustgi, Sheila D; Mika, Stephanie; Schoen, Cathy; Davis, Karen

    2009-07-01

    The United States leads all industrialized countries in the share of national health care expenditures devoted to insurance administration. The U.S. share is over 30 percent greater than Germany's and more than three times that of Japan. This issue brief examines the sources of administrative costs and describes how a private-public approach to health care reform--with the central feature of a national insurance exchange (largely replacing the present individual and small-group markets)--could substantially lower such costs. In three variations on that approach, estimated administrative costs would fall from 12.7 percent of claims to an average of 9.4 percent. Savings--as much as $265 billion over 2010-2020--would be realized through less marketing and underwriting, reduced costs of claims administration, less time spent negotiating provider payment rates, and fewer or standardized commissions to insurance brokers.

  7. 19 CFR 213.5 - Access to Commission resources.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Access to Commission resources. 213.5 Section 213.5 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in...

  8. 47 CFR 0.420 - Other Commission publications.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Other Commission publications. 0.420 Section 0... Information Printed Publications § 0.420 Other Commission publications. The following additional Commission publications may be purchased from the Superintendent of Documents: (a) Statistics of Communications Common...

  9. Indexes to Nuclear Regulatory Commission issuances, January-March 1988

    International Nuclear Information System (INIS)

    1988-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full test reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); and Type of issuance (memorandum, order, decision, etc.)

  10. Indexes to Nuclear Regulatory Commission issuances, January--June 1988

    International Nuclear Information System (INIS)

    1988-09-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administration Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petition of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  11. National Capital Planning Commission Meeting Transcripts

    Data.gov (United States)

    National Capital Planning Commission — Transcripts of the monthly (with the exception of August) National Capital Planning Commission meeting transcripts are provided for research to confirm actions taken...

  12. 29 CFR 2200.92 - Review by the Commission.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION RULES OF PROCEDURE Posthearing Procedures § 2200.92 Review by the Commission. (a) Jurisdiction of the Commission; issues on... Commission to review the entire case. The issues to be decided on review are within the discretion of the...

  13. TH-AB-201-10: Portal Dosimetry with Elekta IViewDose:Performance of the Simplified Commissioning Approach Versus Full Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Kydonieos, M; Folgueras, A; Florescu, L; Cybulski, T; Marinos, N; Thompson, G; Sayeed, A [Elekta Limited, Crawley, West Sussex (United Kingdom); Rozendaal, R; Olaciregui-Ruiz, I [Netherlands Cancer Institute - Antoni van Leeuwenhoek, Amsterdam, Noord-Holland (Netherlands); Subiel, A; Patallo, I Silvestre [National Physical Laboratory, London (United Kingdom)

    2016-06-15

    Purpose: Elekta recently developed a solution for in-vivo EPID dosimetry (iViewDose, Elekta AB, Stockholm, Sweden) in conjunction with the Netherlands Cancer Institute (NKI). This uses a simplified commissioning approach via Template Commissioning Models (TCMs), consisting of a subset of linac-independent pre-defined parameters. This work compares the performance of iViewDose using a TCM commissioning approach with that corresponding to full commissioning. Additionally, the dose reconstruction based on the simplified commissioning approach is validated via independent dose measurements. Methods: Measurements were performed at the NKI on a VersaHD™ (Elekta AB, Stockholm, Sweden). Treatment plans were generated with Pinnacle 9.8 (Philips Medical Systems, Eindhoven, The Netherlands). A farmer chamber dose measurement and two EPID images were used to create a linac-specific commissioning model based on a TCM. A complete set of commissioning measurements was collected and a full commissioning model was created.The performance of iViewDose based on the two commissioning approaches was compared via a series of set-to-work tests in a slab phantom. In these tests, iViewDose reconstructs and compares EPID to TPS dose for square fields, IMRT and VMAT plans via global gamma analysis and isocentre dose difference. A clinical VMAT plan was delivered to a homogeneous Octavius 4D phantom (PTW, Freiburg, Germany). Dose was measured with the Octavius 1500 array and VeriSoft software was used for 3D dose reconstruction. EPID images were acquired. TCM-based iViewDose and 3D Octavius dose distributions were compared against the TPS. Results: For both the TCM-based and the full commissioning approaches, the pass rate, mean γ and dose difference were >97%, <0.5 and <2.5%, respectively. Equivalent gamma analysis results were obtained for iViewDose (TCM approach) and Octavius for a VMAT plan. Conclusion: iViewDose produces similar results with the simplified and full commissioning

  14. National Capital Planning Commission Library contents

    Data.gov (United States)

    National Capital Planning Commission — The National Capital Planning Commission library catalog is a compilation of titles, authors, years of publication and topics of books, reports and NCPC publications.

  15. Fishes of the Taquari-Antas river basin (Patos Lagoon basin, southern Brazil

    Directory of Open Access Journals (Sweden)

    FG. Becker

    Full Text Available The aquatic habitats of the Taquari-Antas river basin (in the Patos Lagoon basin, southern Brazil are under marked environmental transformation because of river damming for hydropower production. In order to provide an information baseline on the fish fauna of the Taquari-Antas basin, we provide a comprehensive survey of fish species based on primary and secondary data. We found 5,299 valid records of fish species in the basin, representing 119 species and 519 sampling sites. There are 13 non-native species, six of which are native to other Neotropical river basins. About 24% of the total native species are still lacking a taxonomic description at the species level. Three native long-distance migratory species were recorded (Leporinus obtusidens, Prochilodus lineatus, Salminus brasiliensis, as well as two potential mid-distance migrators (Parapimelodus nigribarbis and Pimelodus pintado. Although there is only one officially endangered species in the basin (S. brasiliensis, restricted range species (21.7% of total species should be considered in conservation efforts.

  16. The Commissioning of the LHC Technical Systems

    CERN Document Server

    Saban, R; Baggiolini, V; Ballarino, A; Barbero-Soto, E; Bellesia, B; Bordry, Frederick; Bozzini, D; Casas-Lino, M-P; Chareyre, V; Claudet, S; Coelingh, G-J; Dahlerup-Petersen, K; Denz, R; Fehér, S; Flora, R; Gruwé, M; Kain, V; Kirby, G; Koratzinos, M; Lauckner, R; Le Naour, S; Mess, K-H; Millet, F; Montabonnet, V; Nisbet, D; Perea-Solano, B; Pojer, M; Principe, R; Rabehl, R; Rijllart, A; Redaelli, S; Rodríguez-Mateos, F; Schmidt, R; Serio, L; Siemko, A; Solfaroli-Camillocci, M; Thiesen, H; Venturini, W; Vergara-Fernandez, A; Verweij, A; Zerlauth, M

    2007-01-01

    The LHC is an accelerator with unprecedented complexity where the energy stored in magnets and the beams exceeds other accelerators by one-to-two orders of magnitude. To ensure a safe and efficient machine start-up without being plagued by technical problems, a phase of "hardware commissioning" was introduced: a thorough commissioning of technical systems without beam. This activity started in June 2005 with the commissioning of individual systems, followed by operating a full sector, one eighth of the machine; the commissioning is expected to last until spring 2008 when commissioning with beam will start. The LHC architecture allows the commissioning of each of the eight sectors independently from the others, before the installation of other sectors is complete. An important effort went into the definition of the programme and the organization of the coordination in the field, as well as in the preparation of the tools to record and analyze test results. This paper discusses the experience with this approach...

  17. 45 CFR 702.12 - Contempt of the Commission.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Contempt of the Commission. 702.12 Section 702.12 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION ON CIVIL RIGHTS RULES ON HEARINGS, REPORTS, AND MEETINGS OF THE COMMISSION Hearings and Reports § 702.12 Contempt of the Commission...

  18. K-Basins design guidelines

    International Nuclear Information System (INIS)

    Roe, N.R.; Mills, W.C.

    1995-06-01

    The purpose of the design guidelines is to enable SNF and K Basin personnel to complete fuel and sludge removal, and basin water mitigation by providing engineering guidance for equipment design for the fuel basin, facility modifications (upgrades), remote tools, and new processes. It is not intended to be a purchase order reference for vendors. The document identifies materials, methods, and components that work at K Basins; it also Provides design input and a technical review process to facilitate project interfaces with operations in K Basins. This document is intended to compliment other engineering documentation used at K Basins and throughout the Spent Nuclear Fuel Project. Significant provisions, which are incorporated, include portions of the following: General Design Criteria (DOE 1989), Standard Engineering Practices (WHC-CM-6-1), Engineering Practices Guidelines (WHC 1994b), Hanford Plant Standards (DOE-RL 1989), Safety Analysis Manual (WHC-CM-4-46), and Radiological Design Guide (WHC 1994f). Documents (requirements) essential to the engineering design projects at K Basins are referenced in the guidelines

  19. Intra- and inter-basin mercury comparisons: Importance of basin scale and time-weighted methylmercury estimates

    International Nuclear Information System (INIS)

    Bradley, Paul M.; Journey, Celeste A.; Brigham, Mark E.; Burns, Douglas A.; Button, Daniel T.; Riva-Murray, Karen

    2013-01-01

    To assess inter-comparability of fluvial mercury (Hg) observations at substantially different scales, Hg concentrations, yields, and bivariate-relations were evaluated at nested-basin locations in the Edisto River, South Carolina and Hudson River, New York. Differences between scales were observed for filtered methylmercury (FMeHg) in the Edisto (attributed to wetland coverage differences) but not in the Hudson. Total mercury (THg) concentrations and bivariate-relationships did not vary substantially with scale in either basin. Combining results of this and a previously published multi-basin study, fish Hg correlated strongly with sampled water FMeHg concentration (ρ = 0.78; p = 0.003) and annual FMeHg basin yield (ρ = 0.66; p = 0.026). Improved correlation (ρ = 0.88; p < 0.0001) was achieved with time-weighted mean annual FMeHg concentrations estimated from basin-specific LOADEST models and daily streamflow. Results suggest reasonable scalability and inter-comparability for different basin sizes if wetland area or related MeHg-source-area metrics are considered. - Highlights: ► National scale mercury assessments integrate small scale study results. ► Basin scale differences and representativeness of fluvial mercury samples are concerns. ► Wetland area, not basin size, predicts inter-basin methylmercury variability. ► Time-weighted methylmercury estimates improve the prediction of mercury in basin fish. - Fluvial methylmercury concentration correlates with wetland area not basin scale and time-weighted estimates better predict basin top predator mercury than discrete sample estimates.

  20. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition.

  1. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258

    International Nuclear Information System (INIS)

    1996-01-01

    This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition

  2. How to Develop Sustainable Public Administration Reforms

    Directory of Open Access Journals (Sweden)

    Liviu RADU

    2015-02-01

    Full Text Available Public administration reform and reform in general is a never ending story. The human so-cieties are evolving and so do their needs. Pub-lic administration has to keep the pace with the changes that are taking place in society. Specifc issues like ageing of the population and the mi-gration from small to larger communities, or from poor to wealthy regions are placing supplemen-tary burdens on modern administrative systems for decades. The economic crisis that started in 2008 made administrative matters even more complicated. Functional economies and consol-idated democracies proved to be vulnerable to what was considered by many as a market failure. The crisis and the responses of the governments around the world raised a number of questions related to the role that state and public authority in general should play in a modern democracy. The paper is briefy exploring the challenges that administrative systems from the new European Union member states and from the candidatestates were or are facing in their attempt to meet the requirements of the European Union mem-bership, and is proposing a challenging measure: the development of an acquis communautaire for the feld of public administration and consequent-ly the establishment of a correspondent structure inside the European Commission. The acquis communautaire will comprise of a minimum set of principles, widely accepted, that should rep-resent a ‘to do list’ for new member states that are having diffculties in promoting a sound and sustainable reform in public administration.

  3. A Staged Approach to LHC Commissioning

    CERN Document Server

    Lamont, M; Brüning, Oliver Sim; Collier, P; Lauckner, R; Schmidt, R

    2006-01-01

    Effective commissioning of the LHC with beam will demand very good preparation; all concerned subsystems will need to be well-prepared and thoroughly tested before first beam. To clarify the demands on the systems involved the objectives of the commissioning phases are presented, along with a breakdown of the phases and the essential prerequisites for each. The nature of the interdependencies between the various systems is highlighted; in particular the need for a well-planned commissioning of the machine protection system.

  4. Commission on Social Security

    CERN Multimedia

    Staff Association

    2010-01-01

    A commission studying past, present, and future social stakes ! For many years we have been hearing about the problems of funding of health insurance benefits in our different Member States. At CERN we are not totally immune from this problem.  To start with, let us recall that we have a mutual-benefit scheme which covers everyone for the consequences of the uncertainties in life (illness and accidents). The rules of our scheme are established by CERN in the framework of a sub-group of the Standing Concertation Committee, the CERN Health Insurance Scheme Board (CHISB), which is also in charge of managing the scheme.  The work of the “ProtSoc” (Protection Sociale – Social Security) commission, as we like to call it at the Staff Association, is to help your representatives on the CHISB, by preparing together with them the subjects and positions to be put forward and defended. This commission, which groups together the staff delegates who wish to invest their ...

  5. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.

    1999-05-11

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  6. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.; Sharp, T.

    1999-04-01

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  7. The commissioning of nuclear power plants

    International Nuclear Information System (INIS)

    1989-09-01

    The objectives and requirements to be met in commissioning nuclear power plants are presented. The objective of commissioning is to ensure that each component, subsystem, system, or structure in a plant will be capable of fulfilling its design requirements throughout its design life. The requirements for commissioning are: the preparation of a detailed, comprehensive, documented program to demonstrate that all components, systems and structures relevant to safety meet design intent; documented evidence that safety systems are fully operable and can meet design requirements; and, appropriate documentation of the actual state or behaviour of all components, systems and structures relevant to safety. All systems must be included in the commissioning program. Whenever possible, full safety system test should be performed. If a full system in situ test is not possible, alternative means are suggested. (8 refs.)

  8. Multiple Sources of Pressure for Change: The Barroso Commission and Energy Policy for an Enlarged EU

    Directory of Open Access Journals (Sweden)

    Jan Frederik Braun

    2009-11-01

    Full Text Available This article presents a preliminary analysis of how and why the role, work and status of the European Commission are changing in an enlarged European Union. It does so by focusing on multiple sources of pressure for change. These include: enlargement, new modes of governance, administrative reforms and changed leadership under Barroso. Combined, though not interlinked, these multiple sources of pressure are evidence of the increasing difficulty for the Commission to design and propose Community-wide answers to complex challenges in a more diverse Union. For this reason, the Commission under Barroso relies less on its traditional monopoly power to propose formal legislation and more on non-traditional modes of policy-making. Energy policy, especially its external dimension, constitutes a policy field that has been affected by enlargement, i.e. characterised by an increasing heterogeneity of needs and preferences among the member states. Not only does it resists Community-wide answers, it also allows the Commission, as an agent, to make use of bureaucratic drifts, i.e. exploit its strategic position in the EU’s governance system and use of a range of formal and informal resources of expertise. To deliver sustainable European added value to this complex policy area, however, the Commission must focus more on pragmatic policy results by making smart use of the EU’s increasing asymmetry, diversity and subsidiarity in a bottom-up approach. A non-legislative approach can serve as a modus vivendi to keep the momentum going in the Union’s difficult struggle to establish a workable energy regime.

  9. Corresponding control of the administration - procedural development and deadlocks

    International Nuclear Information System (INIS)

    Breuer, R.

    1980-01-01

    The author proceeds from a decision of the Higher Administrative Court of Lueneburg of February 2, 1979 which limits the execution of a partial construction permit for a nuclear power plant to the extent that 'the approved plant components may and will only be used under certain conditions'. He critically reflects on the development of administrative legal protection. In principle, corresponding control of the administration leads to a latent change in the function of appeals aiming at cassation. As a rule, this is not against the law, since sect. 80 of the VwGO acknowledges 'individual interim regulations'. In this case it is a condition of a cancelling nature. The discussion of acknowledged and problematic cases of judicial decisions made under certain conditions is followed by the explanation that the Higher Administrative Court of Lueneburg has delegated the decision which is incumbent upon the Court to the Commission on Reactor Safety. Such a delegation of jurisdiction is contradictory to the constitutional postulate of Art. 19/IV and 91 of the Basic Law. (HSCH) [de

  10. Guidelines for the design of the working rules of the guarantee and quality control in radiotherapy commission

    International Nuclear Information System (INIS)

    Pardo, J.; Galmes, M.A.; Font, J.; Caro, J.; Serra, J.; Mata, F.; Bertan, S.; Biete, A.; Carceller, J.A.; Esco, R.; Palacios, A.; Veiras, C.; Vazquez, M.G.

    2001-01-01

    The 1566/1988 Royal Decree stated on July 17 th , focused on Quality Criteria in Radiation Therapy, was published in the Official Spanish Gazette on August 28 th . Its publication began a self-analysis process in all the Spanish Radiation Oncology Departments due to the fact that it implies the guidelines elaboration of each step of the radiation therapy process, including the patient post-treatment follow up and the equipment quality control. The Royal Decree orders the managers of the hospitals and facilities that have a radiation oncology department to create the Guarantee and Quality Control in Radiotherapy Commission. According to the Spanish law regulations, every single commission must have its own working rules based on the Chapter II, focused in 'Organos Colegiados', of the 30/1992 Law stated on November 27 th about Public Administration Legal Rules. The Guidelines for the design of the Guarantee and Quality Control in Radiotherapy Commission Working Rules here presented, have been done by consensus in Son Dureta University Hospital and afterwards sent to all Radiation Oncology Departments by the Spanish Society for Radiotherapy and Oncology. (author)

  11. Optimization of the commissioning period of nuclear power plant

    International Nuclear Information System (INIS)

    Hou Ganglian; Li Chunyue

    2014-01-01

    Due to current equipment manufacture capacity, construction experience and other factors, commissioning of nuclear power projects was used to be postponed, which could lead to delay of the whole project. Based on the actual situation, optimization of commissioning period and its logic could be an effective way to improve this situation to some extent. Based on previous practice and experience in the schedule management for the commissioning nuclear power projects, this paper analyzes and discusses the characteristics of make commissioning plan and the difficulties of program implementation and strategies of commissioning plan optimization, discusses and presents ways of dynamic plan adjustment and optimization at the vision of entire project, synthesizes the methods of time management through commissioning itself, interface and management, expounds measures for the timing and optimization of commissioning schedule and commissioning period, and sums up the ways of optimization of commissioning period, improving management capabilities and control of optimization principles. (authors)

  12. Leadership of healthcare commissioning networks in England: a mixed-methods study on clinical commissioning groups

    Science.gov (United States)

    Zachariadis, Markos; Oborn, Eivor; Barrett, Michael; Zollinger-Read, Paul

    2013-01-01

    Objective To explore the relational challenges for general practitioner (GP) leaders setting up new network-centric commissioning organisations in the recent health policy reform in England, we use innovation network theory to identify key network leadership practices that facilitate healthcare innovation. Design Mixed-method, multisite and case study research. Setting Six clinical commissioning groups and local clusters in the East of England area, covering in total 208 GPs and 1 662 000 population. Methods Semistructured interviews with 56 lead GPs, practice managers and staff from the local health authorities (primary care trusts, PCT) as well as various healthcare professionals; 21 observations of clinical commissioning group (CCG) board and executive meetings; electronic survey of 58 CCG board members (these included GPs, practice managers, PCT employees, nurses and patient representatives) and subsequent social network analysis. Main outcome measures Collaborative relationships between CCG board members and stakeholders from their healthcare network; clarifying the role of GPs as network leaders; strengths and areas for development of CCGs. Results Drawing upon innovation network theory provides unique insights of the CCG leaders’ activities in establishing best practices and introducing new clinical pathways. In this context we identified three network leadership roles: managing knowledge flows, managing network coherence and managing network stability. Knowledge sharing and effective collaboration among GPs enable network stability and the alignment of CCG objectives with those of the wider health system (network coherence). Even though activities varied between commissioning groups, collaborative initiatives were common. However, there was significant variation among CCGs around the level of engagement with providers, patients and local authorities. Locality (sub) groups played an important role because they linked commissioning decisions with

  13. Survey on the virtual commissioning of manufacturing systems

    Directory of Open Access Journals (Sweden)

    Chi G. Lee

    2014-07-01

    Full Text Available This paper reviews and identifies issues in the application of virtual commissioning technology for automated manufacturing systems. While the real commissioning of a manufacturing system involves a real plant system and a real controller, the virtual commissioning deals with a virtual plant model and a real controller. The expected benefits of virtual commissioning are the reduction of debugging and correction efforts during the subsequent real commissioning stage. However, it requires a virtual plant model and hence still requires significant amount time and efforts. Two main issues are identified, the physical model construction of a virtual device, and the logical model construction of a virtual device. This paper reviews the current literature related to the two issues and proposes future research directions to achieve the full utilization of virtual commissioning technology.

  14. Indexes to Nuclear Regulatory Commission issuances, July--December 1992

    International Nuclear Information System (INIS)

    1993-06-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Digests and Legal Citations Index, Subject Index, and Facility Index. Subject words and/or phrases arranged alphabetically, indicate the issues and subjects covered in the issuances. The subject headings are followed by phrases that give specific information about the subject, as discussed in the issuances being indexed. These phrases are followed by the issuance number and the full text reference

  15. A framework model for water-sharing among co-basin states of a river basin

    Science.gov (United States)

    Garg, N. K.; Azad, Shambhu

    2018-05-01

    A new framework model is presented in this study for sharing of water in a river basin using certain governing variables, in an effort to enhance the objectivity for a reasonable and equitable allocation of water among co-basin states. The governing variables were normalised to reduce the governing variables of different co-basin states of a river basin on same scale. In the absence of objective methods for evaluating the weights to be assigned to co-basin states for water allocation, a framework was conceptualised and formulated to determine the normalised weighting factors of different co-basin states as a function of the governing variables. The water allocation to any co-basin state had been assumed to be proportional to its struggle for equity, which in turn was assumed to be a function of the normalised discontent, satisfaction, and weighting factors of each co-basin state. System dynamics was used effectively to represent and solve the proposed model formulation. The proposed model was successfully applied to the Vamsadhara river basin located in the South-Eastern part of India, and a sensitivity analysis of the proposed model parameters was carried out to prove its robustness in terms of the proposed model convergence and validity over the broad spectrum values of the proposed model parameters. The solution converged quickly to a final allocation of 1444 million cubic metre (MCM) in the case of the Odisha co-basin state, and to 1067 MCM for the Andhra Pradesh co-basin state. The sensitivity analysis showed that the proposed model's allocation varied from 1584 MCM to 1336 MCM for Odisha state and from 927 to 1175 MCM for Andhra, depending upon the importance weights given to the governing variables for the calculation of the weighting factors. Thus, the proposed model was found to be very flexible to explore various policy options to arrive at a decision in a water sharing problem. It can therefore be effectively applied to any trans-boundary problem where

  16. “BRAINSTORM” OF SUSTAINABLE DEVELOPMENT INDEXES AND INDICATORS (ON THE EXAMPLE OF THE VOLGA BASIN

    Directory of Open Access Journals (Sweden)

    N. V. Kostina

    2016-01-01

    Full Text Available Aim of the research – development of management strategies ensuring sustainable development of the territories of the Volga river basin and its administrative units.Methods. In the research we used various methods of mathematical statistics, systematic principles. We propose the conception of "brainstorming" for the assessment of the territory using indices and indicators of sustainable development.Results. We selected nine indicators and indices. We have conducted a correlation analysis of the selected indices and indicators of sustainable development, all of which reflect the state of social, ecological and economic systems. For an integrated assessment of the two objects one introduced the "critical" and the "reference" state and fixed values for each index and indicator under the review. Factor analysis in the space of two principal components is conducted as well as one carried out the calculation of generalized desirability function for each administrative unit of the Volga river basin. "Brainstorm", taking into consideration indices and indicators of sustainable development, showed similarities in the administrative units of the Volga river basin, which primarily reflects approximately the same socio-ecological-economic development, defined by a single policy and economic decisions.Conclusion. The analysis revealed different management strategies of sustainable development of regions. The first group (strategy A includes the Republic of Tatarstan, and Chuvashia, Moscow and Samara regions, which should pay special attention to investments in improving the "life quality" by stabilizing and reducing the degree of anthropogenic load on the territory. The second group (strategy B: Astrakhan, Volgograd, Kirov, Tver and Kostroma and Perm regions - it is advisable to do finance and investment of resources in public education, increase the average lifetime, increase the incomes of the population. For the remaining areas optimally

  17. 78 FR 2280 - Federal Housing Administration (FHA) First Look Sales Method Under the Neighborhood Stabilization...

    Science.gov (United States)

    2013-01-10

    ... Administration (FHA) First Look Sales Method Under the Neighborhood Stabilization Program (NSP): Increased... and sales commission. This notice announces an increase in the discount to 15 percent for properties.... This Notice--Increased Discount on Sales Price for Certain REO Properties Purchased Under the FHA First...

  18. Human activities and its Responses to Glacier Melt Water Over Tarim River Basin

    Science.gov (United States)

    He, Hai; Zhou, Shenbei; Bai, Minghao

    2017-04-01

    Tarim River Basin lies in the south area of Xinjiang Uygur Autonomous Region, the north-west area of China. It is the longest inland river of China. Being far away from ocean and embraced by high mountains, Tarim River Basin is the typical arid region in the world. The intensity of human activities increased rapidly in Tarim River Basin since 1980's and water resources lacking is the major issue restricting the development of social economy. The glacier melt water plays an important role for the regional social and economic development, and it accounts for 40% of mountain-pass runoff. It is a fragile mutual-dependent relationship between local sustainable development and runoff. Under the background of global change glacier melt water process has also changed especially in the arid and semi-arid region. Due to climate change, glacier in Tarim River Basin has melted in an observed way since 1980s, together with increasing trend of annual rainfall and virgin flow in mountain basins. Correspondingly, human activity gets more frequent since 1970s, resulting into the obvious fragile mutual-dependent relationship between basin runoff and water use amount. Through an analysis of meteorological, hydrological and geographical observation data from 1985 to 2015, this thesis make a multi-factor variance analysis of population, cultivation area, industrial development and runoff in upstream and mid-stream of Tarim River under changing conditions. Furthermore, the regulation function of natural factors and water demand management factors on relationship between runoff and water using amount are discussed, including temperature, rainfall, and evaporation, water conservation technology and soil-water exploitation administrative institutions. It concludes that: first, increase in glacier runoff, rainfall amount, and virgin flow haven't notably relieved ecological issue in Tarim River Basin, and even has promoted water use behaviour in different flowing areas and noticeably reduced

  19. Alberta Petroleum Marketing Commission annual report, 1993

    International Nuclear Information System (INIS)

    1994-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1993 marked the last full year of the Commission operating as Alberta's representative in the energy regulatory arena in Canada and the USA; due to restructuring, these functions will be transferred to the Ministry of Energy in early 1994. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 40.2 million bbl, down 11% from 1992, and receipts of heavy crude were 3.7 million bbl, down 42% from 1992. Revenue from crude oil sales was $800 million, down 25% from 1992. The Commission's natural gas activities in 1993 included price determination and information collection. 4 figs., 3 tabs

  20. Basins in ARC-continental collisions

    Science.gov (United States)

    Draut, Amy E.; Clift, Peter D.; Busby, Cathy; Azor, Antonio

    2012-01-01

    Arc-continent collisions occur commonly in the plate-tectonic cycle and result in rapidly formed and rapidly collapsing orogens, often spanning just 5-15 My. Growth of continental masses through arc-continent collision is widely thought to be a major process governing the structural and geochemical evolution of the continental crust over geologic time. Collisions of intra-oceanic arcs with passive continental margins (a situation in which the arc, on the upper plate, faces the continent) involve a substantially different geometry than collisions of intra-oceanic arcs with active continental margins (a situation requiring more than one convergence zone and in which the arc, on the lower plate, backs into the continent), with variable preservation potential for basins in each case. Substantial differences also occur between trench and forearc evolution in tectonically erosive versus tectonically accreting margins, both before and after collision. We examine the evolution of trenches, trench-slope basins, forearc basins, intra-arc basins, and backarc basins during arc-continent collision. The preservation potential of trench-slope basins is low; in collision they are rapidly uplifted and eroded, and at erosive margins they are progressively destroyed by subduction erosion. Post-collisional preservation of trench sediment and trench-slope basins is biased toward margins that were tectonically accreting for a substantial length of time before collision. Forearc basins in erosive margins are usually floored by strong lithosphere and may survive collision with a passive margin, sometimes continuing sedimentation throughout collision and orogeny. The low flexural rigidity of intra-arc basins makes them deep and, if preserved, potentially long records of arc and collisional tectonism. Backarc basins, in contrast, are typically subducted and their sediment either lost or preserved only as fragments in melange sequences. A substantial proportion of the sediment derived from