WorldWideScience

Sample records for barge operations

  1. Aligning barge and terminal operations using service-time profiles

    OpenAIRE

    Douma, Albert M.; Schuur, Peter C.; Schutten, J. Marco J.

    2011-01-01

    We consider a key issue in hinterland container navigation in ports, such as Rotterdam and Antwerp, namely the barge handling problem: how to optimize the alignment of barge and terminal operations in a port. We make a major step in solving the barge handling problem for practical settings. Specifically, we consider restricted opening times of terminals, unbalanced networks, the presence of sea vessels, and closing times of containers. Consequently, at a terminal a barge faces time dependency...

  2. Entrainment, retention, and transport of freely swimming fish in junction gaps between commercial barges operating on the Illinois Waterway

    Science.gov (United States)

    Davis, Jeremiah J.; Jackson, Patrick; Engel, Frank; LeRoy, Jessica Z.; Neeley, Rebecca N.; Finney, Samuel T.; Murphy, Elizabeth

    2016-01-01

    Large Electric Dispersal Barriers were constructed in the Chicago Sanitary and Ship Canal (CSSC) to prevent the transfer of invasive fish species between the Mississippi River Basin and the Great Lakes Basin while simultaneously allowing the passage of commercial barge traffic. We investigated the potential for entrainment, retention, and transport of freely swimming fish within large gaps (> 50 m3) created at junction points between barges. Modified mark and capture trials were employed to assess fish entrainment, retention, and transport by barge tows. A multi-beam sonar system enabled estimation of fish abundance within barge junction gaps. Barges were also instrumented with acoustic Doppler velocity meters to map the velocity distribution in the water surrounding the barge and in the gap formed at the junction of two barges. Results indicate that the water inside the gap can move upstream with a barge tow at speeds near the barge tow travel speed. Water within 1 m to the side of the barge junction gaps was observed to move upstream with the barge tow. Observed transverse and vertical water velocities suggest pathways by which fish may potentially be entrained into barge junction gaps. Results of mark and capture trials provide direct evidence that small fish can become entrained by barges, retained within junction gaps, and transported over distances of at least 15.5 km. Fish entrained within the barge junction gap were retained in that space as the barge tow transited through locks and the Electric Dispersal Barriers, which would be expected to impede fish movement upstream.

  3. Time-Domain Simulation for Coupled Motions of Three Barges Moored Side-by-Side in Floatover Operation

    Institute of Scientific and Technical Information of China (English)

    许鑫; 杨建民; 李欣; 徐亮瑜

    2015-01-01

    Simulating the coupled motions of multiple bodies in the time domain is a complex problem because of the strong hydrodynamic interactions and coupled effect of various mechanical connectors. In this study, we investigate the hydrodynamic responses of three barges moored side-by-side in a floatover operation in the frequency and time domains. In the frequency domain, the damping lid method is adopted to improve the overestimated hydrodynamic coefficients calculated from conventional potential flow theory. A time-domain computing program based on potential flow theory and impulse theory is compiled for analyses that consider multibody hydrodynamic interactions and mechanical effects from lines and fenders. Correspondingly, an experiment is carried out for comparison with the numerical results. All statistics, time series, and power density spectra from decay and irregular wave tests are in a fairly good agreement.

  4. Reactor system on barge

    International Nuclear Information System (INIS)

    Floating electrical power plants or power plant barges add new dimensions to utility planners and agencies in the world. Intrinsically safe and economical reactors (ISER) employ steel reactor pressure vessels, which significantly reduce the weight as compared with PIUS, and provide siting versatility including barge-mounted plants. In this paper, the outline of power plant barges and barge-mounted ISERs is described. Besides their mobility, power plant barges have the salient advantages such as short delivery time and better quality control due to the outfitting in shipyards. These power plant barges may be temporarily moored or permanently grounded in shallow water at the centers of industrial complexes or the suitable areas adjacent to them, and satisfy the increasing needs for electric power. A cost-effective and technically perfect barge positioning system should be designed to meet the specific requirement for the location and its condition. Offshore siting away from coast may be applicable only to large plants of 1,000 MWe or more, and inshore siting and coastal or river siting are considered for an ISER-200 barge-mounted plant. The system of a barge-mounted ISER plant is discussed in the case of a floating type and the type on a seismic base isolator. (Kako, I.)

  5. Integrated barge based oil response system

    International Nuclear Information System (INIS)

    The Oil Pollution Act of 1990 creates an entirely new environment for industry, agencies, and now involves citizen groups. New liability limits and expanded planning requirements involve increased coordination among the entities involved in marine facilities, pipelines, and tanker/barge operations. While prevention provides the best solution, the risk is not going to be eliminated. Response is directly linked to preparation/planning and timely implementation. This report chronicles the assembly of a fully self contained response system, which is modeled after the barge used to support drilling operations in the Chukichi Sea. The report includes planning, equipment list, training, and centers around the development of application specific deployment scenarios

  6. Barge rotation planning and quay scheduling in the port of Rotterdam

    OpenAIRE

    Douma, A Albert; Schuur, PC Peter; Schutten, JMJ Marco

    2007-01-01

    We consider the problem how to align barge rotations with quay schedules of terminals in the port of Rotterdam. Every time a barge visits the port, it has to make a rotation along, on average, eight terminals to load and unload containers. A central solution, e.g., a trusted party that coordinates the activities of all barges and terminals, is not feasible for several reasons. One of the reasons is that barges and terminals want to stay autonomous and in control of their own operations. We pr...

  7. Perancangan Propeler Self-Propelled Barge

    Directory of Open Access Journals (Sweden)

    Billy Teguh kurniawan

    2013-03-01

    Full Text Available Makalah ini menyampaikan suatu penelitian tentang perancangan propeler yang optimal beserta pemilihan daya mesin yang efisien pada self-propelled barge dengan memperhitungkan besarnya nilai tahanan dari barge tersebut. Dengan penambahan sistem propulsi, diharapkan barge dapat beroperasi dengan lebih efisien dibandingkan saat barge beroperasi menggunakan sistem towing atau ditarik tug boat. Perhitungan tahanan barge dilakukan menggunakan metode Holtrop dan Guldhammer-Harvald sehingga dapat diperhi-tungkan geometri dan jenis propeler yang optimal beserta daya mesin yang efisien untuk barge. Propeler yang dianalisis adalah propeler tipe B-Troost Series, sedangkan variasi yang dilakukan untuk perencanaan propeler pada kajian ini adalah variasi putaran propeler pada rentang antara 310-800 rpm, serta variasi jumlah daun pada rentang tiga, empat, lima, dan enam. Besarnya nilai tahanan self-propelled barge untuk metode Holtrop adalah 105.91 kilonewton, sedangkan hasil per-hitungan dari metode Guldhammer-Harvald didapatkan nilai sebesar 109.14 kilonewton. Tipe propeler yang dipilih setelah dilakukan uji kavitasi adalah tipe Troost Series B4-40, dengan diameter sebesar 2.1 m, efisiensi sebesar 0.421, pitch ratio se-besar 0.591, dengan putaran propeler 400 rpm. Daya mesin yg dibutuhkan barge pada kondisi maksimum (BHPMCR sebesar 1669.5 HP. Dengan mempertimbangkan daya tersebut, maka dipilih mesin jenis Caterpillar tipe Marine 3516B yang mem-punyai daya maksimum sebesar 1285 kilowatt atau 1722.5 horsepower dengan putaran mesin sebesar 1200 rpm

  8. Mini barge shuttle speeds in ice

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, M. [BP Exploration Alaska Inc., Anchorage, AK (United States); McAdams, F.; McHale, J. [Alaska Clean Seas, Prudhoe Bay, AK (United States)

    2002-07-01

    The oil response capabilities in the nearshore waters of the Alaska North Slope are equally important to the oil industry and government regulators. Alaska Clean Seas has developed a way to store recovered oil in small tank barges in order to meet the challenge of cleaning up oil spills in drift ice. Workboats are used to take mini barges loaded with recovered oil to a nearby barge or shore facility for off-loading. In July 2000, after spring break-up, the mini barges were tested by Alaska Clean Seas. The test was designed to measure the speeds of the oil spill response workboats. Mini barges with a capacity of 249 barrels were tested along with 500 and 900 horsepower workboats. The workboats moved the mini barges by towing, on-hip, and by pushing. Transit in low ice concentrations had a mean speed of more than 5 knots. Transits in higher ice concentrations had a mean speed of 3 knots. It was noted that transit speeds of the mini barges did not vary much with other measured factors. The speed for towing, pushing and in-hip were the same. The two classes of towing vessels moved at the same speed regardless of the weight they carried. However, the difference between speeds in the two ice concentrations is statistically significant, according to the Wilcoxon rank test. 1 tab., 1 fig.

  9. A mixed integer linear programming model applied in barge planning for Omya

    Directory of Open Access Journals (Sweden)

    David Bredström

    2015-12-01

    Full Text Available This article presents a mathematical model for barge transport planning on the river Rhine, which is part of a decision support system (DSS recently taken into use by the Swiss company Omya. The system is operated by Omya’s regional office in Cologne, Germany, responsible for distribution planning at the regional distribution center (RDC in Moerdijk, the Netherlands. The distribution planning is a vital part of supply chain management of Omya’s production of Norwegian high quality calcium carbonate slurry, supplied to European paper manufacturers. The DSS operates within a vendor managed inventory (VMI setting, where the customer inventories are monitored by Omya, who decides upon the refilling days and quantities delivered by barges. The barge planning problem falls into the category of inventory routing problems (IRP and is further characterized with multiple products, heterogeneous fleet with availability restrictions (the fleet is owned by third party, vehicle compartments, dependency of barge capacity on water-level, multiple customer visits, bounded customer inventories and rolling planning horizon. There are additional modelling details which had to be considered to make it possible to employ the model in practice at a sufficient level of detail. To the best of our knowledge, we have not been able to find similar models covering all these aspects in barge planning. This article presents the developed mixed-integer programming model and discusses practical experience with its solution. Briefly, it also puts the model into the context of the entire business case of value chain optimization in Omya.

  10. From automatic control of vessels designed to operate in offshore conditions to automatic control of a large barge convoy in a river/channel: lessons learned; Do controle automatico de embarcacoes projetadas para condicoes operacionais de offshore para o controle automatico de um grande comboio de barcacas em um rio/canal: licoes aprendidas

    Energy Technology Data Exchange (ETDEWEB)

    Pontes, Anselmo Carvalho [Symmetry Ltda., Rio de Janeiro, RJ (Brazil); Santos, Edson Mesquita do [Marinha do Brasil, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The waterway transportation sector, despite its problems and bottlenecks, is continually seeking alternatives to improve its operations. With goals of increased efficiency, safety and cost reduction, the sector is modernizing and acquiring new technology. The Dynamic Position control system for a large barge convoy is one of the new technology highlights. This innovation may make development in the Brazilian waterway transportation sector feasible by permitting navigational safety and greater flexibility in transport and distribution not only for mined products but for petroleum and its derivatives. This paper presents the development process of The Dynamic Position control system for a large barge convoy in the Parana-Paraguay River, for Rio Tinto Mining Company. The hydrodynamics effects in a river are quite different than those of the traditional offshore environment. The degree of difficulty involved in solving this problem is highly dependent on a ship's characteristics, which can be analyzed in function of their hydrodynamic coefficients. Model tests in towing tanks were made to adjust the hydrodynamic coefficients and characteristics of the thrusters. The choice of the 'backstepping' control law and observer (state estimator) presented in this paper is a result of these particular conditions. The authors point out the advantage of using this technique, since all the properties of the coefficients of the hull, propeller(s) and thruster(s) have already been tested and tuned and are able to make a reliable set-up that optimizes navigation in restricted waterways. (author)

  11. Survival of Juvenile Chinook Salmon during Barge Transport

    Energy Technology Data Exchange (ETDEWEB)

    McMichael, Geoffrey A.; Skalski, J. R.; Deters, Katherine A.

    2011-12-01

    To mitigate for fish losses related to passage through the Federal Columbia River Power System, an extensive fish transportation program using barges and trucks to move fish around and downstream of dams and reservoirs was implemented in 1981. Population modeling and other analyses to support Pacific salmon recovery efforts have assumed that the survival of juvenile salmonids during the transportation experience was 98%. To estimate survival during barge transport from Lower Granite Dam on the Snake River to a release area downstream of Bonneville Dam, a distance of 470 km, we used a novel adaptation of a release-recapture model with acoustic-tagged yearling Chinook salmon (Oncorhynchus tshawytscha) smolts. A total of 1,494 yearling Chinook salmon were surgically implanted with Juvenile Salmon Acoustic Telemetry System (JSATS) acoustic transmitters and passive integrated transponders (PIT) and divided into three groups. The three tagged groups consisted of; (1) a group which was released into the raceway with the population of fish which were later loaded into transportation barges (R{sub B}), (2) a group which was held in a net-pen suspended within the general barge population until 5-6 h prior to barge evacuation, at which time they were confirmed to be alive and then released into the general barge population (R{sub A}), and (3) to validate a model assumption, a group which was euthanized and released into the barge population 2-8 h prior to barge evacuation (R{sub D}). Six replicates of these groups were loaded onto fish transport barges that departed Lower Granite Dam on the Snake River between 29 April and 13 May, 2010. Acoustic receiver arrays between 70 and 220 km downstream of the barge evacuation site were used to detect tagged fish and served as the basis for estimation of survival within the barge. Tag-life-corrected estimates of reach survival were calculated for barged and control fish in each of the six replicate trials. The ratio of survival from

  12. 33 CFR 88.13 - Lights on moored barges.

    Science.gov (United States)

    2010-07-01

    ... barges at anchor or made fast to one or more mooring buoys or other similar device, in lieu of the... this section: (1) A barge or group of barges moored in a slip or slough used primarily for mooring... areas are as follows: Chicago Sanitary Ship Canal (1) Mile 293.2 to 293.9 (3) Mile 295.2 to 296.1...

  13. 33 CFR 163.05 - Tows of seagoing barges within inland waters.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Tows of seagoing barges within... SECURITY (CONTINUED) PORTS AND WATERWAYS SAFETY TOWING OF BARGES § 163.05 Tows of seagoing barges within inland waters. (a) The tows of seagoing barges when navigating the inland waters of the United...

  14. Barged/In-river steelhead migrant data - Evaluation of methods to reduce straying rates of barged juvenile steelhead

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The goals of this study are to develop methods to reduce wandering and straying of steelhead (Oncorhynchus mykiss) that are collected and barged from the Snake...

  15. Ice effects on a barge-based oil spill response system in the Alaskan Beaufort Sea

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, M.; Thompson, E. [BP Exploration Alaska Inc., Anchorage, AK (United States); McAdams, F.; McHale, J. [Alaska Clean Seas, Prudhoe Bay, AK (United States)

    2002-07-01

    In 1999 Alaska Clean Seas assembled a marine oils spill response task force at Prudhoe Bay in preparation for potential oil well blowout in the Beaufort Sea, especially in pack ice conditions. The effects of pack ice on response efforts was measured in timed trials in the nearshore Beaufort Sea. A spill containment and recovery barge-based system reached its oil spill response operating limit in the thick ice of spring and in the thin ice of autumn at concentrations below 1/10. When the boom sweep encountered ice with 1/10 or more coverage, the ice became concentrated in the boom apex and isolated the skimmers. If thick ice pieces were longer than 7 meters, they lifted the boom, and rolled under it. Smaller pieces were able to either move through the apex, or accumulate in the boom. Ice breakers were able to manage the ice in their path by reducing thick drift ice concentrations from 3/10 and 5/10 down to less than 1/10. Barge-based booms were also able to direct ice pieces down the boom length to the boom apex. A pair of steel grates along the hull of the barge protected the floating LORI side brush skimmers from ice damage. A 5 per cent down time was experienced in a continuous 12 hour test in pack ice due to interference from drift ice. The total average down time was 12 per cent of the test period. Barges could move through the ice at break-up in July. By fall freeze-up, slush ice would accumulate, but it did not obstruct the weir skimmer pumps and hoses, not did it interfere with the skimmer's brushes. 8 refs., 5 tabs., 4 figs.

  16. 46 CFR 13.301 - Original application for “Tankerman-PIC (Barge)” endorsement.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Original application for âTankerman-PIC (Barge)â... OFFICERS AND SEAMEN CERTIFICATION OF TANKERMEN Requirements for âTankerman-PIC (Barge)â Endorsement § 13.301 Original application for “Tankerman-PIC (Barge)” endorsement. Each applicant for a...

  17. The thermal analysis of BR-100: A barge/rail nuclear spent fuel transportation container

    International Nuclear Information System (INIS)

    B ampersand W Fuel Company is designing a spent-fuel container called BR-100 that can be used for either barge or rail transport. This paper presents the thermal design and analysis. Both normal operation and hypothetical accident thermal transient conditions are evaluated. The BR-100 cask has a concrete layer than contains free water. During a hypothetical accident, the free water vaporizes and flows from the cask, removing a significant amount of thermal transient energy. The BR-100 transportation package meets the thermal requirements of 10CFR71. It additionally offers substantial margins to established material temperature limits

  18. Barge shipment and reactor handling of a castor V/21 cask

    International Nuclear Information System (INIS)

    The results of this study consist of a complete handling time/dose assessment for barge transport and reactor loading of a Castor V/21 storage cask. Observations are based on the barge transport and spent-fuel loading of storage casks at the Surry, Virginia, nuclear power plant during 1987. The minimum time required to perform all storage cask-handling activities from ship off-loading through placement of the loaded cask in at-reactor storage was 43.8 h. The addition of delays (due to backshifts not worked, etc.) resulted in a total turnaround time for the operation of ∼6 days (24 h/day). Total labor requirement was 136 person-hours. Occupational dose for these activities totaled 416 person-mrem of exposure was due to background dose, representing ∼40% of total dose. The highest dose-producing activity consisted of those steps involved with draining the loaded storage cask (i.e., installing drain pipe and pumping water from cask). This activity resulted in 75 person-mrem of exposure. Lid installation and vacuum drying of the cavity resulted in 56 person-mrem of exposure. The actual loading of spent-fuel assemblies into the storage cask was the third highest dose-contributing activity, resulting in 38 person-mrem of exposure

  19. Recovery of the Irving Whale oil barge: overflights with the laser environmental airborne fluorosensor

    International Nuclear Information System (INIS)

    Contribution of Environment Canada's laser environmental airborne fluorosensor (LEAF) to the recovery in 1996 of the oil barge 'Irving Whale' from the St. Lawrence River was described. Additional equipment employed on board the DC-3 aircraft included an RC-10 colour mapping camera and two down-looking video cameras. Leaking of Bunker C fuel oil was detected around the sunken barge in the days immediately prior to and during the day of the raising of the vessel. During each overflight, the LEAF system produced timely, concise map-based contamination information in hard copy form. The LEAF system also detected extremely thin, sub-sheen levels of oil on the day of the lift over the majority of the southern Gulf of St. Lawrence. The extent of coverage was greatly reduced by the next day and essentially eliminated by the second day after the lift. The LEAF system continued to monitor the 'Irving Whale' as it was transported to Halifax on the deck of the submersible vessel Boabarge 10. There was no evidence of oil leakage during the transit attributable to the 'Irving Whale'. During the entire period of lift and recovery the LEAF system performed flawlessly, and demonstrated the usefulness of remote sensing flights during oil spill response operations. 3 refs., 4 figs

  20. Barge loading facilities in conjunction with wood chipping and sawlog mill, Tennessee River Mile 145. 9R: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    1990-08-01

    The purpose of this Environmental Assessment (EA) is to evaluate the environmental consequences of approving, denying, or adopting reasonable alternatives to a request for barge loading facilities. These facilities would serve a proposed wood chipping and sawlog products operation at Tennessee River Mile (TRM) 145.9, right descending bank, (Kentucky Lake), in Perry County, Tennessee. The site is located between Short Creek and Peters Landing. The applicant is Southeastern Forest Products, L.P. (SFP), Box 73, Linden, Tennessee and the proposed facilities would be constructed on or adjacent to company owned land. Portions of the barge terminal would be constructed on land over which flood easement rights are held by the United States of America and administered by the Tennessee Valley Authority (TVA). The US Army Corps of Engineers (CE) and TVA have regulatory control over the proposed barge terminal facilities since the action would involve construction in the Tennessee River which is a navigable water of the United States. The wood chipping and sawlog products facilities proposed on the upland property are not regulated by the CE or TVA. On the basis of the analysis which follows, it has been determined that a modified proposal (as described herein) would not significantly affect the quality of the human environment, and does not require the preparation of an environmental impact statement. 8 refs.

  1. Using RADARSAT-1 SAR imagery to monitor the recovery of the 'Irving Whale' barge

    International Nuclear Information System (INIS)

    Salvaging the sunken oil barge 'Irving Whale' in the Gulf of St. Lawrence presented an opportunity to demonstrate the operation of the RADARSAT-1 system for acquisition and delivery of timely SAR image data in the event that a spill should occur. This paper summarizes the design and the execution of this demonstration project to detect and possibly monitor oil spills using RADARSAT-1 data. Benefits identified during the demonstration project included (1) increased effectiveness of surveillance activities through larger area coverage, (2) increased effectiveness and cost savings through complementary use of the RADARSAT-based oil spill detection and spill alert system and aircraft-based site investigation, and (3) improved documentation and statistical data collection for managing marine environments, or oil drift data validation

  2. On Some Questions of Barge and Toledo%关于Barge和Toledo的几个问题

    Institute of Scientific and Technical Information of China (English)

    牛应轩; 叶向东

    2000-01-01

    Barge asked if each homeomorphism of a hereditarily decomposable chainable continuum has zero topological entropy and Toledo asked if a homeomorphism of a chainable continuum can always be induced by square commuting diagram on inverse systems of finite graphs. We show in this note that if Toledo's question has a positive answer then Barge's question also has a positive answer.

  3. 49 CFR 176.174 - Transport of Class 1 (explosive) materials in shipborne barges.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Transport of Class 1 (explosive) materials in... REGULATIONS CARRIAGE BY VESSEL Detailed Requirements for Class 1 (Explosive) Materials Cargo Transport Units and Shipborne Barges § 176.174 Transport of Class 1 (explosive) materials in shipborne barges....

  4. 46 CFR 13.305 - Proof of service for “Tankerman-PIC (Barge)” endorsement.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Proof of service for âTankerman-PIC (Barge)â endorsement... AND SEAMEN CERTIFICATION OF TANKERMEN Requirements for âTankerman-PIC (Barge)â Endorsement § 13.305 Proof of service for “Tankerman-PIC (Barge)” endorsement. Service must be proved by a letter on...

  5. Design features of SMART for barge mounted application

    International Nuclear Information System (INIS)

    SMART is an integral reactor of 330 MWt capacity with passive safety features being developed for a wide range of applications including the barge mounted co-generation plant. Its design strives to combine the firmly-established commercial reactor design with new advanced technologies. Thus the use of the industry proven KOFA (Korea Optimized Fuel Assembly) based nuclear fuels is pursued while such radically new technologies as self-pressurizing pressurizer, helical once-through steam generators, and advanced control concepts are being developed. The safety of SMART centers around enhancing the inherent safety characteristics of the reactor and salient features include low core power density, integral arrangement to eliminate large break loss of coolant accident, etc. The progression of emergency situations into accidents is prevented with a number of advanced engineered safety features such as Passive Residual Heat Removal System, Passive Emergency Core Cooling System, Safeguard Vessel, Passive Containment Over-pressure Protection. This paper presents the status of current SMART development, characteristics of SMART safety systems and the possibility of SMART application to barge mounted environment. (author)

  6. 9/11-Related Experiences and Tasks of Landfill and Barge Workers: Qualitative Analysis from the World Trade Center Health Registry

    OpenAIRE

    Cone James E; Scheu Katherine E; Ekenga Christine C; Stellman Steven D; Farfel Mark R

    2011-01-01

    Abstract Background Few studies have documented the experiences of individuals who participated in the recovery and cleanup efforts at the World Trade Center Recovery Operation at Fresh Kills Landfill, on debris loading piers, and on transport barges after the September 11, 2001 terrorist attack. Methods Semi-structured telephone interviews were conducted with a purposive sample of workers and volunteers from the World Trade Center Health Registry. Qualitative methods were used to analyze the...

  7. Market Anatomy of a Drought: Modeling Barge and Corn Market Adaptation to Reduced Rainfall and Low Mississippi River Water Levels During the 2012 Midwestern U.S. Drought

    Science.gov (United States)

    Foster, B.; Characklis, G. W.; Thurman, W. N.

    2015-12-01

    for keeping shipping channels open during drought, the results of this work should help them to decide how different interventions might benefit or hurt barge operators and/or corn sellers.

  8. Evaluating the maneuverability of a new type of self-propelled barge

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    A new type of self-propelled barge was designed specifically for use on the Chishui River.This paper presents experimental results of its performance from tests in water of different depths, while beating different loads.For test purposes, one of the best self-propelled barges from the Chishui River was used as a performance reference.The comparison showed that the new design has better maneuvering performance.

  9. Jovian Vortices and Barges: HST observations 1994-1998

    Science.gov (United States)

    Morales, R.; Sanchez-Lavega, A.; Lecacheux, J.; Colas, F.; Miyazaki, I.

    2000-10-01

    We have used the HST-WFPC2 archived images of Jupiter in the period 1994-1998 to study the zonal and meridional distributions, long-term motions, lifetimes, interactions and other properties of the vortices larger than 2 degrees. The latitude range covered spans from +75 to -75 degrees. High-resolution images obtained with the 890nm, 410nm and 953nm wavelength filters allowed us to make a morphological classification based on their appearance in each filter. The vortices are anticyclones, and their long-term motions have been completed with ground-based images and are compared to the mean Jovian zonal wind profile. Significant differences are found between the vortex velocities and the mean zonal winds. Some vortices exhibited important drift changes in short period times. We analyze a possible correlation between their size and zonal wind velocity. On the other hand, the "barges" lie in the cyclone domains of the wind-profile and have been identified in several latitudes. Their latitudinal size is similar in all of them (typically 1.6 degrees) but their longitudinal size ranges from 1 to 32 degrees. We discuss the temporal evolution of some of these cyclonic regions. The Spanish team was supported by Gobierno Vasco PI 034/97. The French team was supported by the "Programme National de Planetologie." RM acknowledges a fellowship from Universidad Pais Vasco.

  10. Computationally Inexpensive Approach for Pitch Control of Offshore Wind Turbine on Barge Floating Platform

    Science.gov (United States)

    Zuo, Shan; Song, Y. D.; Wang, Lei; Song, Qing-wang

    2013-01-01

    Offshore floating wind turbine (OFWT) has gained increasing attention during the past decade because of the offshore high-quality wind power and complex load environment. The control system is a tradeoff between power tracking and fatigue load reduction in the above-rated wind speed area. In allusion to the external disturbances and uncertain system parameters of OFWT due to the proximity to load centers and strong wave coupling, this paper proposes a computationally inexpensive robust adaptive control approach with memory-based compensation for blade pitch control. The method is tested and compared with a baseline controller and a conventional individual blade pitch controller with the “NREL offshore 5 MW baseline wind turbine” being mounted on a barge platform run on FAST and Matlab/Simulink, operating in the above-rated condition. It is shown that the advanced control approach is not only robust to complex wind and wave disturbances but adaptive to varying and uncertain system parameters as well. The simulation results demonstrate that the proposed method performs better in reducing power fluctuations, fatigue loads and platform vibration as compared to the conventional individual blade pitch control. PMID:24453834

  11. 46 CFR 11.472 - Officer endorsements as barge supervisor.

    Science.gov (United States)

    2010-10-01

    ..., mechanic, electrician, crane operator, subsea specialist, ballast control operator or equivalent..., electrician, crane operator, subsea specialist, ballast control operator or equivalent supervisory position...

  12. Coupled Loads Analysis of the Modified NASA Barge Pegasus and Space Launch System Hardware

    Science.gov (United States)

    Knight, J. Brent

    2015-01-01

    A Coupled Loads Analysis (CLA) has been performed for barge transport of Space Launch System hardware on the recently modified NASA barge Pegasus. The barge re-design was facilitated with detailed finite element analyses by the ARMY Corps of Engineers - Marine Design Center. The Finite Element Model (FEM) utilized in the design was also used in the subject CLA. The Pegasus FEM and CLA results are presented as well as a comparison of the analysis process to that of a payload being transported to space via the Space Shuttle. Discussion of the dynamic forcing functions is included as well. The process of performing a dynamic CLA of NASA hardware during marine transport is thought to be a first and can likely support minimization of undue conservatism.

  13. 46 CFR 151.05-2 - Compliance with requirements for tank barges carrying benzene and benzene containing cargoes, or...

    Science.gov (United States)

    2010-10-01

    ... benzene and benzene containing cargoes, or butyl acrylate cargoes. 151.05-2 Section 151.05-2 Shipping... Compliance with requirements for tank barges carrying benzene and benzene containing cargoes, or butyl acrylate cargoes. A tank barge certificated to carry benzene and benzene containing cargoes or...

  14. Preliminary assessment of costs and risks of transporting spent fuel by barge

    International Nuclear Information System (INIS)

    The purpose of this study is to analyze the costs and risks associated with transporting spent fuel by barge. The barge movements would be made in combination with rail movements to transport spent fuel from plants to a repository. For the purpose of this analysis, three candidate repository sites are analyzed: Yucca Mountain, Nevada, Deaf Smith, Texas, and Hanford, Washington. This report complements a report prepared by Sandia National Laboratories in 1984 that analyzes the costs and risks of transporting spent fuel by rail and by truck to nine candidate repository sites

  15. Contribution of the gg→cc-barg process to the cross section of charmed particles production

    International Nuclear Information System (INIS)

    The role of process gg→cc-barg is considered in the reactions of hadronic charmed particle production. The analytical method for obtaining the matrix element squareds is developed. It is shown that the account for the third order of perturbation theory leads to a considerable increase in the value of cross sections. 11 refs.; 2 figs.; 1 tab

  16. 76 FR 74068 - Guidance on Domestic Implementation of International Standards for Oceangoing Barges Carrying...

    Science.gov (United States)

    2011-11-30

    ... SECURITY Coast Guard Guidance on Domestic Implementation of International Standards for Oceangoing Barges... regarding our public dockets in the January 17, 2008, issue of the Federal Register (73 FR 3316... consideration that would provide a domestic equivalency for international standards with respect to U.S....

  17. Laboratory data on Snake River steelhead - Evaluation of methods to reduce straying rates of barged juvenile steelhead

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The goals of this study are to develop methods to reduce wandering and straying of steelhead (Oncorhynchus mykiss) that are collected and barged from the Snake...

  18. 9/11-Related Experiences and Tasks of Landfill and Barge Workers: Qualitative Analysis from the World Trade Center Health Registry

    Directory of Open Access Journals (Sweden)

    Cone James E

    2011-05-01

    Full Text Available Abstract Background Few studies have documented the experiences of individuals who participated in the recovery and cleanup efforts at the World Trade Center Recovery Operation at Fresh Kills Landfill, on debris loading piers, and on transport barges after the September 11, 2001 terrorist attack. Methods Semi-structured telephone interviews were conducted with a purposive sample of workers and volunteers from the World Trade Center Health Registry. Qualitative methods were used to analyze the narratives. Results Twenty workers and volunteers were interviewed. They described the transport of debris to the Landfill via barges, the tasks and responsibilities associated with their post-9/11 work at the Landfill, and their reflections on their post-9/11 experiences. Tasks included sorting through debris, recovering human remains, searching for evidence from the terrorist attacks, and providing food and counseling services. Exposures mentioned included dust, fumes, and odors. Eight years after the World Trade Center disaster, workers expressed frustration about poor risk communication during recovery and cleanup work. Though proud of their contributions in the months after 9/11, some participants were concerned about long-term health outcomes. Conclusions This qualitative study provided unique insight into the experiences, exposures, and concerns of understudied groups of 9/11 recovery and cleanup workers. The findings are being used to inform the development of subsequent World Trade Center Health Registry exposure and health assessments.

  19. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility.

    Energy Technology Data Exchange (ETDEWEB)

    Pratt, Joseph William; Harris, Aaron P

    2013-01-01

    A barge-mounted hydrogen-fueled proton exchange membrane (PEM) fuel cell system has the potential to reduce emissions and fossil fuel use of maritime vessels in and around ports. This study determines the technical feasibility of this concept and examines specific options on the U.S. West Coast for deployment practicality and potential for commercialization.The conceptual design of the system is found to be straightforward and technically feasible in several configurations corresponding to various power levels and run times.The most technically viable and commercially attractive deployment options were found to be powering container ships at berth at the Port of Tacoma and/or Seattle, powering tugs at anchorage near the Port of Oakland, and powering refrigerated containers on-board Hawaiian inter-island transport barges. Other attractive demonstration options were found at the Port of Seattle, the Suisun Bay Reserve Fleet, the California Maritime Academy, and an excursion vessel on the Ohio River.

  20. Self-supporting barge-mounted energy station with HTR-module

    International Nuclear Information System (INIS)

    The concept of a barge-mounted mobile HTR modular power plant is an attractive proposition particularly for developing countries and threshold countries with inadequate power supply infrastructures. Especially the coupling of electricity generation with sea water desalination for the production of drinking water and water for commercial and industrial uses offers a promising field of applications, with favorable product costs attainable as a function of site-specific conditions. (orig.)

  1. Babcock and Wilcox BR-100 100-ton rail/barge spent fuel shipping cask

    International Nuclear Information System (INIS)

    This Preliminary Design Report (PDR) provides a detailed description of the design, analyses, and testing programs for the BR-100 cask. The BR-100 is a Type B(U) cask designed for transport by rail or barge. This report presents the preliminary analyses and tests which have been performed for the BR-100 and outlines the confirmatory analyses and tests which will be performed

  2. Babcock and Wilcox BR-100 100-ton rail/barge spent fuel shipping cask

    Energy Technology Data Exchange (ETDEWEB)

    None

    1990-02-01

    This Preliminary Design Report (PDR) provides a detailed description of the design, analyses, and testing programs for the BR-100 cask. The BR-100 is a Type B(U) cask designed for transport by rail or barge. This report presents the preliminary analyses and tests which have been performed for the BR-100 and outlines the confirmatory analyses and tests which will be performed.

  3. Portable Dynamic Positioning Control System on A Barge in Short-Crested Waves Using the Neural Network Algorithm

    Institute of Scientific and Technical Information of China (English)

    FANG Ming-chung; LEE Zi-yi

    2013-01-01

    This paper develops a nonlinear mathematical model to simulate the dynamic motion behavior of the barge equipped with the portable outboard Dynamic Positioning (DP) system in short-crested waves.The self-tuning Proportional-Derivative (PD) controller based on the neural network algorithm is applied to control the thrusters for optimal adjustment of the barge position in waves.In addition to the wave,the current,the wind and the nonlinear drift force are also considered in the calculations.The time domain simulations for the six-degree-of-freedom motions of the barge with the DP system are solved by the 4th order Runge-Kutta method which can compromise the efficiency and the accuracy of the simulations.The technique of the portable alternative DP system developed here can serve as a practical tool to assist those ships without being equipped with the DP facility while the dynamic positioning missions are needed.

  4. 46 CFR 113.25-30 - General emergency alarm systems for barges of 300 or more gross tons with sleeping accommodations...

    Science.gov (United States)

    2010-10-01

    ... more gross tons with sleeping accommodations for more than six persons. 113.25-30 Section 113.25-30... for barges of 300 or more gross tons with sleeping accommodations for more than six persons. The general emergency alarm system for a barge of 300 or more gross tons with sleeping accommodations for...

  5. AmerenUE's new barge unloading facility moves twice the coal at half the horse-power

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D.J.

    2002-07-01

    AmerenUE's, Sioux Plant, 30 miles from St. Louis on the Mississippi River, has recently completed the installation of a new E-Crane barge unloading facility to provide an alternate delivery route for coal, and support future increases in generating capacity. The crane features a moving counter weight. The barge unloading system is mounted on a 32-foot diameter cell which is in effect an artificial island, made by driving lengths of sheet steel into the riverbed, filling the resulting cell with rock and capping it with concrete.

  6. Oyster polynuclear aromatic hydrocarbon fingerprinting applied to the Apex barge oil spill

    International Nuclear Information System (INIS)

    An estimated 692,000 gallons of catalytic feed stock oil was spilled into Galveston Bay on July 28, 1990, when a tanker collided with three Apex barges in the Houston Ship Channel. Oysters were collected and analyzed from Galveston Bay Todd's Dump (GBRD) before the spill and after the spill. Oysters were also collected from Galveston Bay Redfish Island (GBRI), a site known to be impacted by the spill, 37 and 110 days after the spill. The spilled oil was also analyzed. The concentration of 18 polynuclear aromatic hydrocarbons (PAH) measured as part of the National Oceanic and Atmospheric Administration's National Status ampersand Trends (NS ampersand T) showed a sharp increase from 100 ng/g to over 600 ng/g. Concentrations of these 18 PAHs were also found at GBRI. Fingerprinting techniques applied to data from oyster analyses demonstrated the presence of bioavailable Apex Barge oil 37, 110, and 132 days after the spill at GHTD and GBRI. Fingerprinting becomes less diagnostic with time due to possible environmental weathering of the oil. The fingerprint from GBTD 495 and 851 days after the spill will be presented and discussed

  7. Baseline Environmental Analysis Report for the K-1251 Barge Facility at the East Tennessee Technology Park, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Van Winkle J.E.

    2007-08-24

    This report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) K-1251 Barge Facility, which is located at the East Tennessee Technology Park (ETTP). DOE is proposing to lease the facility to the Community Reuse Organization of East Tennessee (CROET). This report provides supporting information for the use, by a potential lessee, of government-owned facilities at ETTP. This report is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The lease footprint is slightly over 1 acre. The majority of the lease footprint is defined by a perimeter fence that surrounds a gravel-covered area with a small concrete pad within it. Also included is a gravel drive with locked gates at each end that extends on the east side to South First Avenue, providing access to the facility. The facility is located along the Clinch River and an inlet of the river that forms its southern boundary. To the east, west, and north, the lease footprint is surrounded by DOE property. Preparation of this report included the review of government records, title documents, historic aerial photos, visual and physical inspections of the property and adjacent properties, and interviews with current and former employees involved in the operations on the real property to identify any areas on the property where hazardous substances and petroleum products or their derivatives and acutely hazardous wastes were known to have been released or disposed. Radiological surveys were conducted and chemical samples were collected to assess the facility's condition.

  8. 33 CFR 207.640 - Sacramento Deep Water Ship Channel Barge Lock and Approach Canals; use, administration, and...

    Science.gov (United States)

    2010-07-01

    ... mooring or anchoring of boats or other craft in the approaches to the lock, where such mooring will... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Sacramento Deep Water Ship... REGULATIONS § 207.640 Sacramento Deep Water Ship Channel Barge Lock and Approach Canals; use,...

  9. PHAEOPIGMENT CONCENTRATION, PHYTOPLANKTON - WET WEIGHT and other data from BARGE from 1975-05-01 to 1975-07-01 (NCEI Accession 7600377)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Water depth and other data from the BARGE from 01 May 1975 to 01 July 1975. Data were collected by the Skidway Institute of Oceanography (SKIO) as part of the...

  10. An analysis of accidents involving towboat-barge combination on selected inland waterways of the United States.

    OpenAIRE

    Gamble, William John

    1980-01-01

    Approved for public release; distribution is unlimited This study uses a statistical analysis approach on a computerized data base to analyze accidents involving towboat-barge combinations on the inland waterways of the United States. The main areas explored are the factors affecting the severity and the frequency of accidents. In addition, multiple regression models are used to predict the severity of towboat accidents from a set of independent accident variables. Conclusions and recom...

  11. Preliminary technical and economic viability for the implantation of fluvial transport of CNG (Compressed Natural Gas) for barges in Amazon Region; Avaliacao preliminar de viabilidade tecnico-economica para implantacao de transporte fluvial de GNC (Gas Natual Comprimido) por barcacas na Regiao Amazonica

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Marcos C.C. de; Porto, Paulo L. Lemgruber [Interocean Engenharia e Ship Management, Rio de janeiro, RJ (Brazil); Cunha, Rafael H. da [Metro Rio, RJ (Brazil); Garcia, Rafael M. [Pic Brasil (Brazil); Almeida, Marco A.R. de [Universidade Gama Filho (UGF), Rio de Janeiro, RJ (Brazil)

    2004-07-01

    The isolated regions of the Amazon present difficulties for integration with the electrical system which is creating some economic problems due to the consequent costs of electric generation of subsidies as a function of the fossil fuel use as oils diesel and fuel. A viable option is the use of Natural Gas - NG that is Also available in the region. Its modal of transport possible in the Region North they are for gas-lines or barges. The Compressed Natural Gas transport is distinguished that - CNG for barges was still not tested operationally in Brazil. Soon, to develop a Preliminary Study of Viability Technician - Economic - SVTE for the implantation of fluvial transport of CNG between the cities of Coari and Manaus is basic, therefore it is created strategical alternative for the electric generation in this region. The electric sector, the characteristics of the NG and the transport in this region had been analyzed to support to the work. The gas line and the fluvial transport of CNG for barges in this region are not conflicting, and they in a complementary form can act. The SVTE presented a Liquid Present Value and Internal Tax of very attractive Return justifying its implantation. (author)

  12. TOTAL RESISTANCE PREDICTION OF SELF PROPELLED COAL BARGE (SPCB USING COMPUTATIONAL FLUID DYNAMIC

    Directory of Open Access Journals (Sweden)

    Agung Purwana

    2015-06-01

    Full Text Available In the present paper the computational fluid dynamic (CFD technique is applied to predict the total resistance (Rt of Self Propelled Coal Barge (SPCB. The simulation process was executed using ANSYS®software based on fluid flow (CFX solver. The selected CFD method is volume of fluid (VOF. The solid modeling of SPCB is developed using Maxsurf®. Boundary conditions are set on each domain area covering bottom,free surface, inlet, outlet, shipand wall. The variation of computaitional grid (meshing grid which is used in computation are SST (Shear Stress Transport67,000, SST 73,000, SST 103,000, SST 117,000, SST 127,000, SST 147,000, SST 157,000, and SST 200,500. Total resistance (Rt resulted from CFX computation is validated with total resistance (Rt resulted from Holtrop. The larger of grid meshing size, the better of validation result. The CFD technique demonstrated good agreement with Holtrop formulae in predicting the total resistance (Rt of SPCB.

  13. The multi-task barge: a floating deep-sea production, storage and unloading unit, with surface production heads and drilling installations; La barge multifonctions: une unite flottante de production, de stockage et dechargement en eau profonde, avec tetes de production en surface et installations de forage

    Energy Technology Data Exchange (ETDEWEB)

    Valenchon, C.; Rossig, J.H. [Bouygues Offshore (France); Pouget, G. [Sedco-Forex (France); Biolley, F. [Institut Francais du Petrole, 92 - Rueil-Malmaison (France)

    1998-05-01

    The multi-task barge is devoted to the exploitation of deep-sea fields in rather good conditions. It has been designed to bring together within a single installation, a production, storage and unloading unit and the necessary means for the drilling, the connecting and the work-over of wells. Thus submarine well-heads and well-head platforms are no longer needed. When the field configuration or the use of oriented drillings allows to group several wells together, the multi-task platform allows to use more economical surface production heads installed on steel rigid risers. This concept requires less investments thanks to less expensive drilling operations and restricted submarine installations, and to easier well operations and lower exploitation costs. Crude oil storage is ensured to up to about 2 millions of barrels. This paper presents the design aspects and the dynamical analysis of risers with the methods used. The tensioning and mooring system is examined and the advantages of the cylindrical float system is underlined and compared to the classical hydro-pneumatic systems. (J.S.) 11 refs.

  14. An inter-laboratory trial of the unified BARGE bioaccessibility method for arsenic, cadmium and lead in soil

    Energy Technology Data Exchange (ETDEWEB)

    Wragg, Joanna [British Geological Survey, Nottingham (United Kingdom); Cave, Mark, E-mail: mrca@bgs.ac.uk [British Geological Survey, Nottingham (United Kingdom); Basta, Nick [School of Environment and Natural Resources, Ohio State University, Columbus, OH, 43210-1085 (United States); Brandon, Esther [National Institute for Public Health and the Environment, Bilthoven (Netherlands); Casteel, Stan [College of Veterinary Medicine, University of Missouri, 65205 (United States); Denys, Sebastien [INERIS, Parc Technologique Alata, Verneuil-en-Halatte (France); Gron, Christian [DHI Water Environment Health, Horsholm (Denmark); Oomen, Agnes [National Institute for Public Health and the Environment, Bilthoven (Netherlands); Reimer, Kenneth [Environmental Sciences Group, Royal Military College of Canada, Kingston, Ontario (Canada); Tack, Karine [INERIS, Parc Technologique Alata, Verneuil-en-Halatte (France); Van de Wiele, Tom [Laboratory of Microbial Ecology and Technology, University of Ghent, Ghent (Belgium)

    2011-09-01

    The Bioaccessibility Research Group of Europe (BARGE) has carried out an inter-laboratory trial of a proposed harmonised in vitro physiologically based ingestion bioaccessibility procedure for soils, called the Unified BARGE Method (UBM). The UBM includes an initial saliva phase and simulated stomach and intestine compartments. The trial involved the participation of seven laboratories (five European and two North American) providing bioaccessibility data for As (11 samples), Cd (9 samples) and Pb (13 samples) using soils with in vivo relative bioavailability data measured using a swine model. The results of the study were compared with benchmark criteria for assessing the suitability of the UBM to provide data for human health risk assessments. Mine waste and slag soils containing high concentrations of As caused problems of poor repeatability and reproducibility which were alleviated when the samples were run at lower soil to solution ratios. The study showed that the UBM met the benchmark criteria for both the stomach and stomach and intestine phase for As. For Cd, three out of four criteria were met for the stomach phase but only one for the stomach and intestine phase. For Pb two, out of four criteria were met for the stomach phase and none for the stomach and intestine phase. However, the study recommends tighter control of pH in the stomach phase extraction to improve between-laboratory variability, more reproducible in vivo validation data and that a follow up inter-laboratory trial should be carried out.

  15. An inter-laboratory trial of the unified BARGE bioaccessibility method for arsenic, cadmium and lead in soil

    International Nuclear Information System (INIS)

    The Bioaccessibility Research Group of Europe (BARGE) has carried out an inter-laboratory trial of a proposed harmonised in vitro physiologically based ingestion bioaccessibility procedure for soils, called the Unified BARGE Method (UBM). The UBM includes an initial saliva phase and simulated stomach and intestine compartments. The trial involved the participation of seven laboratories (five European and two North American) providing bioaccessibility data for As (11 samples), Cd (9 samples) and Pb (13 samples) using soils with in vivo relative bioavailability data measured using a swine model. The results of the study were compared with benchmark criteria for assessing the suitability of the UBM to provide data for human health risk assessments. Mine waste and slag soils containing high concentrations of As caused problems of poor repeatability and reproducibility which were alleviated when the samples were run at lower soil to solution ratios. The study showed that the UBM met the benchmark criteria for both the stomach and stomach and intestine phase for As. For Cd, three out of four criteria were met for the stomach phase but only one for the stomach and intestine phase. For Pb two, out of four criteria were met for the stomach phase and none for the stomach and intestine phase. However, the study recommends tighter control of pH in the stomach phase extraction to improve between-laboratory variability, more reproducible in vivo validation data and that a follow up inter-laboratory trial should be carried out.

  16. 77 FR 54495 - Regulated Navigation Area; Thames River Degaussing Range Replacement Operations; New London, CT

    Science.gov (United States)

    2012-09-05

    ... require barges and equipment to take up a portion of the channel while they perform various operations... the Captain of the Port Sector Long Island Sound (COTP) to establish speed and wake restrictions and... wake restrictions as well as allow the Coast Guard to prohibit all vessel traffic through the...

  17. Cytological-cytogenetic analyses of winter flounder embryos collected from the Benthos at the barge North Cape oil spill

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, J.B. [Milford Laboratory, CT (United States). Northeast Fisheries Science Center

    1999-01-01

    The oil barge North Cape ran aground on Moonstone Beach in Rhode Island on January 19, 1996, spilling 828 000 gallons (US) of a combination of diesel and home heating oils. Samples of winter flounder embryos were collected from salt ponds in the area of the spill using an epibenthic sled. An examination of the field-sampled embryos based on gross morphology, levels of moribund embryos, mitotic index, and chromosomal anomalies found that a significant number exhibited high levels of one or more of these conditions when compared with flounder embryos raised under laboratory-controlled conditions. No chorion damage was noted in embryos collected from the field nor were there any significant findings of lordosis or scoliosis. The cumulative impact on winter flounder embryos of North Cape oil exposure was an estimated 51% reduction in the number of embryos surviving to the larval stage. (author)

  18. Cytological-cytogenetic analyses of winter flounder embryos collected from the Benthos at the barge North Cape oil spill

    International Nuclear Information System (INIS)

    The oil barge North Cape ran aground on Moonstone Beach in Rhode Island on January 19, 1996, spilling 828 000 gallons (US) of a combination of diesel and home heating oils. Samples of winter flounder embryos were collected from salt ponds in the area of the spill using an epibenthic sled. An examination of the field-sampled embryos based on gross morphology, levels of moribund embryos, mitotic index, and chromosomal anomalies found that a significant number exhibited high levels of one or more of these conditions when compared with flounder embryos raised under laboratory-controlled conditions. No chorion damage was noted in embryos collected from the field nor were there any significant findings of lordosis or scoliosis. The cumulative impact on winter flounder embryos of North Cape oil exposure was an estimated 51% reduction in the number of embryos surviving to the larval stage. (author)

  19. Rank Reliability Assessment of the Technical Object at Early Design Stage with Limited Operational Data--A Case Study

    Institute of Scientific and Technical Information of China (English)

    Marek Mlynczak; Tomasz Nowakowski

    2006-01-01

    Construction conception of an object requires multi-criterion analysis. In such a case, reliability analysis gives rough information on availability and fulfillment of main functions. In the paper, the analysis of drive system in river barge pusher is presented. It consists of Reliability Block Diagram (RBD) analysis of various composition of the system and Markov analysis based on prior estimated operational data.

  20. The transportation operations system: A description

    International Nuclear Information System (INIS)

    This paper presents a description of the system for transporting radioactive waste that may be deployed to accomplish the assigned system mission, which includes accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from waste generator sites and transporting them to the FWMS destination facilities. The system description presented here contains, in part, irradiated fuel and waste casks, ancillary equipments, truck, rail, and barge transporters, cask and vehicle traffic management organizations, maintenance facilities, and other operations elements. The description is for a fully implemented system, which is not expected to be achieved, however, until several years after initial operations. 6 figs

  1. Fish survey, fishing duration, and other data from net trawls from the BARGE and other platforms as part of Outer Continental Shelf Environmental Assessment Program (OCSEAP) from 16 June 1976 to 30 March 1977 (NODC Accession 7800030)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Fish survey, fishing duration, and other data were collected from net trawls from the BARGE and other platforms from 16 June 1976 to 30 March 1977. Data were...

  2. Fish survey, fishing duration, and other data from net trawls from the BARGE as part of Outer Continental Shelf Environmental Assessment Program (OCSEAP) from 24 June 1976 to 10 September 1976 (NODC Accession 7800146)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Fish survey, fishing duration, and other data were collected from net trawls from the BARGE from 24 June 1976 to 10 September 1976. Data were collected by the...

  3. Fish survey, fishing duration, and other data from net trawls from the BARGE and other platforms as part of Outer Continental Shelf Environmental Assessment Program (OCSEAP) from 30 May 1977 to 13 October 1977 (NODC Accession 7800268)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Fish survey, fishing duration, and other data were collected from net trawls from the BARGE and other platforms from 30 May 1977 to 13 October 1977. Data were...

  4. Marine bird sighting and other data from the BARGE and other platforms from Beaufort Sea and other locations as part of the Outer Continental Shelf Environmental Assessment Program (OCSEAP) from 07 May 1976 to 15 October 1976 (NODC Accession 7800031)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Marine bird sighting and other data were collected from the BARGE and other platforms from the Beaufort Sea and other locations from 07 May 1976 to 15 October 1976....

  5. OTEC (Ocean Thermal Energy Conversion) cold water pipe at-sea test program data analysis project. Comparisons between measured and predicted barge and pipe response: Evaluation of the NOAA/ROTECF and NOAA/TRW computer models

    Science.gov (United States)

    Vega, L. A.; Nihous, G. C.

    1985-10-01

    The simulation of the at-sea test conditions with computer models is considered. The NOAA/ROTECF model simulates a coupled barge/pipe system driven by waves and currents in the frequency domain (standard-deviation parameters are considered). The NOAA/TRW model simulates a pipe driven by user-specified barge motions, waves, and currents in the time domain (parameters as a function of time are considered).

  6. Research on structure strength evaluation of deck barge with offshore wind turbine%风机运输甲板驳结构强度评估

    Institute of Scientific and Technical Information of China (English)

    李志杰; 夏利娟

    2016-01-01

    The deck barge with offshore wind turbine is a type of ocean engineering auxiliary vessel with carriage functions for offshore wind turbine. With the emergence of offshore wind power,the development of this kind of engineering vessels have boomed in recent years.In this paper, direct calculation of the whole ship and specification approach method according to the CCS rule were used to evaluate the structure strength of one deck barge with offshore wind turbine. The results show that the strength of the barge fulfills the requirements demanded. The main research results of this paper are helpful for structural design of similar vessels.%风机运输甲板驳是用于海上风机运输的海洋工程辅助船,近年来随着海上风力发电的兴起而迅速发展。本文采用全船有限元直接计算和 CCS规范计算2种方法对某风机运输甲板驳的结构强度进行评估,计算表明该船结构强度满足设计要求。本文的研究成果和结论对同类型风电安装船舶的结构设计具有参考意义。

  7. Implementation of the project for the construction and operation of a nuclear heat and power plant on the basis of a floating power unit with KLT-40C reactors

    International Nuclear Information System (INIS)

    This paper presents the results of research and development on floating nuclear power plant (FNPP) for electricity and heat production for remote locations and small island or coastal communities. Evaluations of construction period, social and economic factors as well as safety and operational issues of the non-self-propelled barge-mounted NPP is given. (author)

  8. The operational efficiency of waterway transport of forest chips on Finland's Lake Saimaa

    Energy Technology Data Exchange (ETDEWEB)

    Karttunen, K.; Ranta, T. [Lappeenranta Univ. of Technology, LUT Savo Sustainable Technologies, Mikkeli (Finland); Vaatainen, K.; Asikainen, A. [The Finnish Forest Research Inst., Joensuu (Finland)], E-mail: kalle.karttunen@lut.fi

    2012-11-01

    New and cost-efficient methods for use in supply chains for energy wood should be found, to reach the targets of the renewable energy utilisation set by the European Union. The long-distance waterway transportation of forest fuels should be thoroughly investigated, especially in areas where the transport distance is long and waterways could provide a feasible method of conveying forest fuel. In comparison to transport of forest chips by truck, barge-based waterway transport shows a competitive advantage due to the larger loads and higher bulk density of chips it allows. The cost-efficiency of waterway transportation operations related to forest chips in Finland's Lake Saimaa region was studied using practical demonstrations and discrete-event simulation. The varying demand for fuel wood in three separate bio-power plants on the Saimaa lakeside (near the cities of Varkaus, Mikkeli, and Savonlinna) was addressed in several barge transportation scenarios. Finally, the economy of barge transportation was compared to the economy of truck transportation as a function of transportation distance and in terms of the annual performance of the transportation methods examined. The waterway supply chain of forest chips was cost-competitive to road transport by truck after 100-150 km. According to the simulation study, the most economical waterway transport options were based on fixed barge system and shift-independent harbor logistics where loading and unloading of barges were carried-out with a wheeled loader and a belt conveyor. Total supply chain costs including the best waterway logistics from road side storage to power plant ranged from 10.75 euros to 11.64 euros/MWh in distances of 100-150 km by waterways. The energy-density of forest chips in the barge load was found to be, on average, 25% higher than that in truck hauling, because of the better compaction of chips. Waterway transport is a viable option for long-distance transportation of forest chips in Eastern

  9. 46 CFR 15.610 - Master and mate (pilot) of towing vessels.

    Science.gov (United States)

    2010-10-01

    ...: (1) To operate a towing vessel with tank barges, or a tow of barges carrying hazardous materials... without barges, or a tow of uninspected barges, an officer in charge of the towing vessel must...

  10. La barge à queue noire (Limosa limosa) dans le delta du Sénégal : régime alimentaire, données biométriques, importance économique

    OpenAIRE

    Tréca, Bernard

    1984-01-01

    Le nombre des barges à queue noire hivernant dans le delta du Sénégal semble avoir diminué au cours des 30 dernières années. Le riz, particulièrement le riz cultivé (#Oriza sativa$), était la principale nourriture des oiseaux rencontrés sur ou autour des rizières. L'analyse de 186 contenus stomacaux donne 74% de riz cultivé, 12% de riz sauvage (#O. brevigulata$ et # O. barthii$), 10% de tubercules et 4% d'autres graines, aucun reste animal ayant été trouvé. Les barges consomment de 15 à 16 gr...

  11. Demonstration of the operation and performance of a pressurised alkaline electrolyser operating in the hydrogen fuelling station in Porsgrunn, Norway

    International Nuclear Information System (INIS)

    Highlights: • Hydrogen filling station at Porsgrunn, Norway is demonstrated. • The pressurised electrolyser was operated in different modes. • The behaviour of the electrolyser and its characteristics are explained. • This data could be used to model electrolysers in electrical power systems. • The information could also be used to find appropriate control strategies to run electrolysers. - Abstract: Operation of the hydrogen filling station at Herøya, Porsgrunn, Norway is reported and analysed in this paper. A 12 bar(g) pressurised alkaline electrolyser with a nominal load of 24 kW provides hydrogen for this filling station and is designed to work with time variable power from renewable resources. Two wind turbines rated at 6 kW each and two solar panels rated at 2.5 kW each are available on site to provide the power for hydrogen production which can then be used to supply a number of fuel cell and modified Internal Combustion Engine (ICE) vehicles. The station has a hydrogen storage capacity of 6.3 m3 in pressurised tanks at 450 bar(g). As a part of the authors’ experimental work, operational data and the characteristics of the pressurised alkaline electrolyser installed at the site under different operational modes have been collected and analysed. The archival value of this paper is the presentation and discussion of the electrolyser characteristics which are relevant to the identification of an acceptable control strategy to integrate such electrolyser loads within the power system and thus provide improved performance of the power system when exposed to the highly time variable energy supply from renewable sources

  12. An analysis of contingencies for making casks available for use during the early years of Federal Waste Management System operations

    International Nuclear Information System (INIS)

    A study has been performed to examine the contingencies that could be pursued by the Department of Energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) for shipping spent fuel beginning in 1998. OCRWM's current plan is to initiate operations using early production units of Initiative I truck and rail/barge casks that are presently being designed. Contingencies to this plan were considered in case some unforeseen event occurs that precludes the Initiative I casks from entering into service early in 1998 in sufficient quantities (both numbers and types) to satisfy DOE's shipping needs. Specifically, the study addressed the potential availability of cask systems, selected several cask usage scenarios, determined the requirements for casks under these scenarios, generically assessed different strategies for acquiring casks or the use of casks, and generically assessed cask fabrication capabilities. Issues concerning both domestic and foreign resources were addressed with a focus on the first five years of Federal Waste Management System (FWMS) operation

  13. Spatial Operations

    Directory of Open Access Journals (Sweden)

    Anda VELICANU

    2010-09-01

    Full Text Available This paper contains a brief description of the most important operations that can be performed on spatial data such as spatial queries, create, update, insert, delete operations, conversions, operations on the map or analysis on grid cells. Each operation has a graphical example and some of them have code examples in Oracle and PostgreSQL.

  14. Operational amplifiers

    CERN Document Server

    Dostal, Jiri

    1993-01-01

    This book provides the reader with the practical knowledge necessary to select and use operational amplifier devices. It presents an extensive treatment of applications and a practically oriented, unified theory of operational circuits.Provides the reader with practical knowledge necessary to select and use operational amplifier devices. Presents an extensive treatment of applications and a practically oriented, unified theory of operational circuits

  15. Operator Fundamentals

    International Nuclear Information System (INIS)

    Recent events show the need for constant attention on the operator fundamentals, in the commercial nuclear industry. The first report about decline in the application of operator fundamentals during plant operational activities and transient situations was issued in July 2005. Analyses of the events recorded during 18 month period between 2010 and 2011 show similar causes and contributors like it was before July 2005. Due to that fact, the WANO issued SOER 2013-1 Operator Fundamentals Weaknesses with proposed suggestions how to analyse area of operator fundamentals and gives recommendations for effective and sustainable corrective actions. Operator fundamentals are the essential knowledge, skills, behaviours, and practices that operating crews need to apply to operate the plant effectively. These fundamentals are as follows: · Monitoring plant indications and conditions closely · Controlling plant evolutions precisely · Operating the plant with a conservative bias · Working effectively as a team · Having a solid understanding of plant design, engineering principles, and sciences. NEK analysed area of operator fundamentals and verified how consistently the basic principles in the plant control are followed in practice. Some opportunities for improvement were recognized for the training area, operational procedures format improvement and improvement in process of preparation of the planned activities during power operation or during plant shutdown. Among other measures, stability in operation with a sufficient safety margin can be achieved only through continuous monitoring of the operational practice and by constant highlighting of the operational standards. (author)

  16. Urban operations

    OpenAIRE

    Rice, Ian C.

    2003-01-01

    This thesis examines military performance in both urban and traditional non-urban environments. Cases used in this study are German operations on the Russian front, Israeli operations during the Yom Kippur War, and U.S. Marine operations in South Vietnam. This thesis establishes a framework for analysis consisting of six factors. These include environment, time, informational aspects of military operations, application of existing technology, intangible human factors, and the decisionmaking o...

  17. COMPACT OPERATORS

    Directory of Open Access Journals (Sweden)

    Charles Swartz

    2009-12-01

    Full Text Available We give a characterization in terms of the transpose operator for a continuous linear operator between locally convex spaces to map bounded sets into relatively weakly compact [relatively compact, precompact] sets. Our results give a known characterization for compact operators between Banach spaces.

  18. 海洋铺管船用张紧器整体吊装可靠性分析%Reliability analysis for tensioner integral hoisting of marine pipe laying barge

    Institute of Scientific and Technical Information of China (English)

    李宝宗; 郭志平; 张超; 王连磊; 张士民

    2011-01-01

    The main frame is one of important composition of Marine Tensioner on the barge for lay ing oil pipeline in deep sea, which is applied to mount and position the tensioner on one hand and to sup-port the hoist of integral Marine Tensioner on the other hand. In the process of localizing the Marine Ten-sinner, the integral, hoisting of Marine Tensioner is a very important technical link, in which structuralstrength of main frame for bearing overall weight of Marine Tensioner is a hey point to be analyzed.By ANSYS software, the article the main stress spot and dangerous section in the process of hoisting analyzed andcomputed to confirm the reliability of hoisting of Marine Tensioner.%主支架是深海铺管船用张紧器重要的组成设备之一,它除了在使用过程中起到张紧器的安装与定位作用外,还要为张紧器的整体吊装起到支撑作用.在船用张紧器技术的国产化过程中,张紧器的整体吊装是非常重要的一个技术环节.张紧器在吊装的过程中,主支架的结构强度能否承载张紧器整体重量是需要分析的重点.通过ansys有限元分析软件对船用张紧器整体吊装时的主要受力部位和危险截面进行分析和计算,以此来验证船用张紧器整体吊装的可靠性.

  19. Operational calculus

    CERN Document Server

    Boehme, Thomas K

    1987-01-01

    Operational Calculus, Volume II is a methodical presentation of operational calculus. An outline of the general theory of linear differential equations with constant coefficients is presented. Integral operational calculus and advanced topics in operational calculus, including locally integrable functions and convergence in the space of operators, are also discussed. Formulas and tables are included.Comprised of four sections, this volume begins with a discussion on the general theory of linear differential equations with constant coefficients, focusing on such topics as homogeneous and non-ho

  20. Operating systems

    CERN Document Server

    Tsichritzis, Dionysios C; Rheinboldt, Werner

    1974-01-01

    Operating Systems deals with the fundamental concepts and principles that govern the behavior of operating systems. Many issues regarding the structure of operating systems, including the problems of managing processes, processors, and memory, are examined. Various aspects of operating systems are also discussed, from input-output and files to security, protection, reliability, design methods, performance evaluation, and implementation methods.Comprised of 10 chapters, this volume begins with an overview of what constitutes an operating system, followed by a discussion on the definition and pr

  1. Spacecraft operations

    CERN Document Server

    Sellmaier, Florian; Schmidhuber, Michael

    2015-01-01

    The book describes the basic concepts of spaceflight operations, for both, human and unmanned missions. The basic subsystems of a space vehicle are explained in dedicated chapters, the relationship of spacecraft design and the very unique space environment are laid out. Flight dynamics are taught as well as ground segment requirements. Mission operations are divided into preparation including management aspects, execution and planning. Deep space missions and space robotic operations are included as special cases. The book is based on a course held at the German Space Operation Center (GSOC).

  2. Offshore wind farm Bockstigen - installation and operation experience

    Energy Technology Data Exchange (ETDEWEB)

    Lange, B. [Risoe National Lab., Wind Energy and Atmospheric Physics Dept., Roskilde (Denmark); Aagaard, E.; Andersen, P.E.; Moeller, A. [Wind World af 1997 A/S, Noerresundby (Denmark); Niklasson, S.; Wickman, A. [Vindkompaniet, Degerhamn (Sweden)

    1999-03-01

    The first Swedish offshore wind farm Bockstigen is operating since March 1998 near the coast of Gotland. It was built as a demonstration project by the Swedish wind farm developer Vindkompaniet, the Danish wind turbine manufacturer Wind World and the British offshore construction company Seacore and partly funded under the EU-THERMIE program. Bockstigen is the fourth offshore wind farm world-wide. While at previous wind farms the main emphasis laid on the demonstration of the technical feasibility of offshore wind energy utilisation, Bockstigen was aimed at demonstrating its economic viability. A number of innovative concepts have been employed: Drilled monopile foundations were used to save costs. A new construction method has been applied making use of a jack-up barge. A new control system for the turbines and the whole wind farm was developed, which controls the maximum power output, the flicker and the reactive power consumption depending on online measurements of the actual grid state. These new developments have been implemented successfully. A substantial cost reduction compared to previous offshore projects could be achieved. (au)

  3. Operational efficiency

    Science.gov (United States)

    Bland, Dan; Davis, Tom; Griffin, Sandy

    1990-01-01

    Space transportation avionics technology operational efficiency issues are presented in viewgraph form. Information is given on ascent flight design, autonomous spacecraft control, operations management systems, advanced mission control, telerobotics/telepresence, advanced software integration, advanced test/checkout systems, advanced training systems, and systems monitoring.

  4. Hanaro operation

    International Nuclear Information System (INIS)

    HANARO was configurated its first operating core in 1995. Long term operation test was conducted up to 3-1 cycle during 1996, in order to investigate the reactor characteristics due to fuel depletion and additional fuel loading. Now HANARO has accumulated 168.4 days of total operation time and 2,687.5 MWD of total thermal output. Reactor analysis, producing operation datum and its validation with test, periodic inspection and maintenance of the facility are continuously conducted for safe operation of the HANARO. Conducted the verification tests for installed utilization facilities, and successfully performed the radiation emergency drill. The shutdown report of TRIGA Mark II and III was submitted to MOST, and decommissioning will be started from 1997. (author). 70 tabs., 50 figs., 27 refs

  5. Hanaro operation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Ji Bok; Jeon, Byung Jin; Kwack, Byung Ho [and others

    1997-01-01

    HANARO was configurated its first operating core in 1995. Long term operation test was conducted up to 3-1 cycle during 1996, in order to investigate the reactor characteristics due to fuel depletion and additional fuel loading. Now HANARO has accumulated 168.4 days of total operation time and 2,687.5 MWD of total thermal output. Reactor analysis, producing operation datum and its validation with test, periodic inspection and maintenance of the facility are continuously conducted for safe operation of the HANARO. Conducted the verification tests for installed utilization facilities, and successfully performed the radiation emergency drill. The shutdown report of TRIGA Mark II and III was submitted to MOST, and decommissioning will be started from 1997. (author). 70 tabs., 50 figs., 27 refs.

  6. Operator lattices

    International Nuclear Information System (INIS)

    The finite-element method enables us to convert the operator differential equations of a quantum field theory into operator difference equations. These difference equations are consistent with the requirements of quantum mechanics and they do not exhibit fermion doubling, a problem that frequently plagues lattice treatments of fermions. Guage invariance can also be incorporated into the difference equations. On a finite lattice the operator difference equations can be solved in closed form. For the case of the Schwinger model the anomaly is computed and results in excellent agreement are obtained with the known continuum value

  7. Reactor operation

    CERN Document Server

    Shaw, J

    2013-01-01

    Reactor Operation covers the theoretical aspects and design information of nuclear reactors. This book is composed of nine chapters that also consider their control, calibration, and experimentation.The opening chapters present the general problems of reactor operation and the principles of reactor control and operation. The succeeding chapters deal with the instrumentation, start-up, pre-commissioning, and physical experiments of nuclear reactors. The remaining chapters are devoted to the control rod calibrations and temperature coefficient measurements in the reactor. These chapters also exp

  8. Operating models

    International Nuclear Information System (INIS)

    The representing and operating society for cogeneration systems (BTB) has the management objective, as representing and operating society, to construct and operate cogeneration systems and supply heat, steam or electric power to its customers. At present, the following is realized in the Western part of Berlin: Three small cogeneration systems in small-scale industries, a gas turbine plant in the paper factory of Melitta a combustion engine driven (gas/diesel) cogeneration system with stand-by function in the university hospital of Steglitz. (orig.)

  9. Operator theory

    CERN Document Server

    2015-01-01

    A one-sentence definition of operator theory could be: The study of (linear) continuous operations between topological vector spaces, these being in general (but not exclusively) Fréchet, Banach, or Hilbert spaces (or their duals). Operator theory is thus a very wide field, with numerous facets, both applied and theoretical. There are deep connections with complex analysis, functional analysis, mathematical physics, and electrical engineering, to name a few. Fascinating new applications and directions regularly appear, such as operator spaces, free probability, and applications to Clifford analysis. In our choice of the sections, we tried to reflect this diversity. This is a dynamic ongoing project, and more sections are planned, to complete the picture. We hope you enjoy the reading, and profit from this endeavor.

  10. Operator training

    International Nuclear Information System (INIS)

    The traditional operator job is changing, which among other things has generated a need for better job training. Surprisingly increased process automation has lead to increased operator qualifications, i.e. basic job training but also up-date and rehearsal training within certain fixed intervals. There are several, similar models for instructional system development available in the literature. One model which is of special interest integrates Operator Training development and Man-Machine Interfaces development. The extent to which Systematic Operator Training has been implemented varies with branches and companies. The nuclear power branch is given as an example in the report. This branch probably represents something better than the average among the process industries.(author)

  11. Operational Excellence

    OpenAIRE

    Ostertag, Richard

    2011-01-01

    Focus of this thesis is to introduce methods used within the concept of Operational Excellence, being one of possible approaches to manage business processes, and subsequent application of these methods to accounting operations of a concrete company. Using application of these methods, thesis aims to evaluate quality of the process outputs as well as the utilization rate of available labor resources within analyzed business unit. Concrete suggestions to improve quality of process outputs and ...

  12. Operational Sequencing

    DEFF Research Database (Denmark)

    Nielsen, Thomas Rosendal; Hustvedt, Kjersti

    2016-01-01

    Bakhtinian theory, Brian Edmiston developed a solution to this in the 1990s: the principle of ‘dialogic sequencing’. Aiming to escape the conflict between relativism and absolutism, we present an alternative to Edmiston’s approach, based on Niklas Luhmann’s theory of ‘operational closure’: operational...... sequencing. The principle is presented in the context of the previous debate between Edmiston and Joe Winston, and its application is demonstrated and assessed in our prototype process drama, Fertility Miracles....

  13. Applied Operations Research: Operator's Assistant

    Science.gov (United States)

    Cole, Stuart K.

    2015-01-01

    NASA operates high value critical equipment (HVCE) that requires trouble shooting, periodic maintenance and continued monitoring by Operations staff. The complexity HVCE and information required to maintain and trouble shoot HVCE to assure continued mission success as paper is voluminous. Training on new HVCE is commensurate with the need for equipment maintenance. LaRC Research Directorate has undertaken a proactive research to support Operations staff by initiation of the development and prototyping an electronic computer based portable maintenance aid (Operator's Assistant). This research established a goal with multiple objectives and a working prototype was developed. The research identified affordable solutions; constraints; demonstrated use of commercial off the shelf software; use of the US Coast Guard maintenance solution; NASA Procedure Representation Language; and the identification of computer system strategies; where these demonstrations and capabilities support the Operator, and maintenance. The results revealed validation against measures of effectiveness and overall proved a substantial training and capability sustainment tool. The research indicated that the OA could be deployed operationally at the LaRC Compressor Station with an expectation of satisfactorily results and to obtain additional lessons learned prior to deployment at other LaRC Research Directorate Facilities. The research revealed projected cost and time savings.

  14. Operational indicators

    International Nuclear Information System (INIS)

    The chapter presents the operational indicators related to budget, travel costs and tickets, the evolution of the annual program for regulatory inspection, the scientific production, requested patents and the numbers related to the production of the services offered by the Institution

  15. Operational Circulars

    CERN Document Server

    2003-01-01

    Operational Circular N° 4 - April 2003 Conditions for use by members of the CERN personnel of vehicles belonging to or rented by CERN - This circular has been drawn up. Operational Circular N° 5 - October 2000 Use of CERN computing facilities - Further details on the personal use of CERN computing facilities Operational Circular N° 5 and its Subsidiary Rules http://cern.ch/ComputingRules defines the rules for the use of CERN computing facilities. One of the basic principles governing such use is that it must come within the professional duties of the user concerned, as defined by the user's divisional hierarchy. However, personal use of the computing facilities is tolerated or allowed provided : a) It is in compliance with Operational Circular N° 5 and not detrimental to official duties, including those of other users; b) the frequency and duration is limited and there is a negligible use of CERN resources; c) it does not constitute a political, commercial and/or profit-making activity; d) it is not...

  16. Operating Efficiently

    Science.gov (United States)

    Kennedy, Mike

    2010-01-01

    The ailing economy has spared few schools and universities. Faced with funding cutbacks, most education administrators have had to make difficult choices about where to allocate dwindling resources. Even in the best of financial times, educating students is the first priority. When money is tight, school maintenance and operations (M&O) programs…

  17. Accelerator operations

    International Nuclear Information System (INIS)

    This section is concerned with the operation of both the tandem-linac system and the Dynamitron, two accelerators that are used for entirely different research. Developmental activities associated with the tandem and the Dynamitron are also treated here, but developmental activities associated with the superconducting linac are covered separately because this work is a program of technology development in its own right

  18. Barge-mounted systems: siting concepts

    International Nuclear Information System (INIS)

    Concepts are described for siting platform-mounted nuclear plants at the location of industrial facilities where these plants would furnish industrial process heat and/or electrical power. These concepts include a wet emplacement and a dry emplacement situated at a representative industrial site that could be considered typical of sites along navigable canals adjacent to the ocean or along inland waterways

  19. Sources of expertise in transportation planning, management, and operations: Information received as of September 25, 1987

    International Nuclear Information System (INIS)

    The DOE Office of Storage and Transportation Systems is responsible for the development and management of a transportation system to provide all the necessary services for the transportation of the spent fuel and wastes from reactor sites to repositories. DOE/ORO has requested Oak Ridge Associated Universities (ORAU) to assist DOE in developing rosters of sources of transportation expertise in: (1) carrier operations; (2) transportation management, planning, and logistics; (3) transportation equipment; (4) transportation facilities design and operation; (5) vehicle safety; and (6) transportation operations quality assurance; as related to truck, rail, barge, and intermodal transportation. Persons or organizations with experience in shipping of non-hazardous materials, spent nuclear fuel, other radioactive materials, and/or other hazardous materials were included in the information system. A mailed inquiry was sent to over 2300 potential sources of transportation expertise. Responses were received from 207 persons and 254 organizations. Section 1 contains the identification numbers of the individuals and organizations that responded. Section 2 contains identification codes, names, addresses, and phone numbers of each of the individual and organization respondents. The reader can refer to Section 2 for the name and address of the respondents for the identification codes listed for each technical area/experience base in Section 1

  20. Sources of expertise in transportation planning, management, and operations: Information received as of September 25, 1987

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    The DOE Office of Storage and Transportation Systems is responsible for the development and management of a transportation system to provide all the necessary services for the transportation of the spent fuel and wastes from reactor sites to repositories. DOE/ORO has requested Oak Ridge Associated Universities (ORAU) to assist DOE in developing rosters of sources of transportation expertise in: (1) carrier operations; (2) transportation management, planning, and logistics; (3) transportation equipment; (4) transportation facilities design and operation; (5) vehicle safety; and (6) transportation operations quality assurance; as related to truck, rail, barge, and intermodal transportation. Persons or organizations with experience in shipping of non-hazardous materials, spent nuclear fuel, other radioactive materials, and/or other hazardous materials were included in the information system. A mailed inquiry was sent to over 2300 potential sources of transportation expertise. Responses were received from 207 persons and 254 organizations. Section 1 contains the identification numbers of the individuals and organizations that responded. Section 2 contains identification codes, names, addresses, and phone numbers of each of the individual and organization respondents. The reader can refer to Section 2 for the name and address of the respondents for the identification codes listed for each technical area/experience base in Section 1.

  1. Site operations

    International Nuclear Information System (INIS)

    This chapter is a discussion of the management and operations practices used at the Barnwell Waste Management Facility in Barnwell, SC. The following topics are discussed: (1) Waste receiving and inspection, including manifest and certificates of compliance, radiological surveys, disposition of nonconforming items, and decontamination and disposition of secondary waste streams; (2) Waste disposal, including Title 10 CFR 61 requirements, disposal area evaluations, shipment offloading, container emplacement, and radiation protection; (3) Trench closure, including trench backfilling, trench capping, and permanent markers; (4) Site maintenance and stabilization, including trench maintenance, surface water management, and site closure activities; (5) Site monitoring programs, including operational monitoring, and environmental monitoring program; (6) Personnel training and qualifications, including basic training program, safety training program, special skills training, and physical qualifications; (7) Records management, including waste records, personnel training records, personnel dosimetry records, site monitoring records, trench qualification and construction records, and site drawings and stabilization records; (8) Site security; (9) Emergency response plans; and (10) Quality assurance

  2. Operative Links

    DEFF Research Database (Denmark)

    Wistoft, Karen; Højlund, Holger

    2012-01-01

    educational approaches. Methods: Mixed qualitative design: survey based on telephone interviews with health managers (n=72), personal and focus group interviews with health professionals (n=84) and pupils (n=108) from 18 school classes, and comparative case studies in five selected municipalities of various...... educational goals, learning content, or value clarification. Health pedagogy is often a matter of retrospective rationalization rather than the starting point of planning. Health and risk behaviour approaches override health educational approaches. Conclusions: Operational links between health education...

  3. Operation Poorman

    International Nuclear Information System (INIS)

    The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system

  4. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Surgeons Education Patients and Family Skills Programs Your Lung Operation Your Lung Operation DVD After Your Operation Back to Your Lung Operation Your Lung Operation DVD Welcome Your Lung ...

  5. NWS Alaska Sea Ice Program: Operations and Decision Support Services

    Science.gov (United States)

    Schreck, M. B.; Nelson, J. A., Jr.; Heim, R.

    2015-12-01

    The National Weather Service's Alaska Sea Ice Program is designed to service customers and partners operating and planning operations within Alaska waters. The Alaska Sea Ice Program offers daily sea ice and sea surface temperature analysis products. The program also delivers a five day sea ice forecast 3 times each week, provides a 3 month sea ice outlook at the end of each month, and has staff available to respond to sea ice related information inquiries. These analysis and forecast products are utilized by many entities around the state of Alaska and nationally for safety of navigation and community strategic planning. The list of current customers stem from academia and research institutions, to local state and federal agencies, to resupply barges, to coastal subsistence hunters, to gold dredgers, to fisheries, to the general public. Due to a longer sea ice free season over recent years, activity in the waters around Alaska has increased. This has led to a rise in decision support services from the Alaska Sea Ice Program. The ASIP is in constant contact with the National Ice Center as well as the United States Coast Guard (USCG) for safety of navigation. In the past, the ASIP provided briefings to the USCG when in support of search and rescue efforts. Currently, not only does that support remain, but our team is also briefing on sea ice outlooks into the next few months. As traffic in the Arctic increases, the ASIP will be called upon to provide more and more services on varying time scales to meet customer needs. This talk will address the many facets of the current Alaska Sea Ice Program as well as delve into what we see as the future of the ASIP.

  6. Operative links

    DEFF Research Database (Denmark)

    Wistoft, Karen

    2010-01-01

    as networks: second, a semantic perspective on discourses and concepts of health, and, third, a health pedagogical perspective on participation, intervention, and roles. This paper argues for the importance of 'operative links' between different levels in health strategies. It is proposed that such......The article combines a public management perspective with a pedagogical perspective on health promotion. Our aim is to look into recent reforms in Denmark on health promotion in order to see how managerial ideas have been combined with welfare professional ideals concerning broad, positive and...... links are supported by network structures, shared semantics and situated pedagogical means of intervention....

  7. Operation Context

    DEFF Research Database (Denmark)

    Stüben, Henning; Tietjen, Anne

    2006-01-01

    Abstract: This paper seeks to challenge the notion of context from an operational perspective. Can we grasp the forces that shape the complex conditions for an architectural or urban design within the notion of context? By shifting the gaze towards the agency of architecture, contextual analysis is...... explored as a search for action instead of meaning. For this purpose the notion of context will be discussed from an Actor-Network-Theory (ANT) perspective. By means of research by design, i.e. design experiment and theoretical reflection, the potential of a key concept and method in architectural...

  8. Operative Links

    DEFF Research Database (Denmark)

    Wistoft, Karen; Højlund, Holger

    2012-01-01

    The article combines a public management perspective with a pedagogical perspective on health promotion. Our aim is to look into recent reforms in Denmark on health promotion in order to see how managerial ideas have been combined with welfare professional ideals concerning broad, positive and...... framework has three positions: first, a policy perspective on public organisations as networks, second, a semantic perspective on discourses and concepts of health and, third, a health pedagogical perspective on participation, intervention, and roles. Conclusion: it is necessary to establish ‘operative...... links' that indicate cooperative levels which facilitate a creative and innovative effort in disease prevention and health promotion targeted at children and adolescents - across traditional professional boundaries. It is proposed that such links are supported by network structures, shared semantics and...

  9. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... State Legislation State Advocacy Resources Chapter Advocacy Lobby Day Grant Program State Legislation Tracked by the College ... Your Lung Operation Preparing for Your Operation The Day of Your Lung Operation After Your Operation Your ...

  10. 46 CFR 151.45-2 - Special operating requirements.

    Science.gov (United States)

    2010-10-01

    ... a tank barge in the tow into the water, as required by 33 CFR 151.15; and (vii) Ensuring that the... sign at or on each tank or by a single sign similar to the following example: Tank No. Cargo IP /xxxx/ IS /xxxx/ 2P /xxxx/ 2S /xxxx/ These signs may be printed, handwritten, permanent or changeable,...

  11. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Liability Reform GME and Workforce Trauma and EMS ... College of Surgeons Education Patients and Family Skills Programs Your Lung Operation Your Lung Operation DVD After Your Operation ...

  12. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Program Top 10 Reasons to Participate Resources YFA E-News Resident and Associate Society Resident and Associate ... Webinars Membership International Exchange Scholar Program Resources RAS E-News Operation Giving Back Operation Giving Back Operation ...

  13. Abandoned Vessels and Barges, Geographic NAD83, LOSCO (1996) [barge_LOSCO_1996

    Data.gov (United States)

    Louisiana Geographic Information Center — This is a point dataset with two accompanying 'sample tables' [vabfldsmpap96] and [vablabsmpap96] that summarize the results of the study to inventory abandoned...

  14. An analysis of contingencies for making casks available for use during the early years of federal waste management system operations

    International Nuclear Information System (INIS)

    This paper reports on a study which has been performed to examine the contingencies that could be pursued by the Department of energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) for shipping spent fuel beginning in 1998. OCRWM's current plan is to initiate operations using early production units of Initiative I truck and rail/barge casks that are presently being designed. Contingencies to this plan were considered in case some unforeseen event occurs that precludes the Initiative I casks from entering into service early in 1998 in sufficient quantities (both numbers and types) to satisfy DOE's shipping needs. Specifically, the study addressed the potential availability of cask systems, selected several cask usage scenarios, determined the requirements for casks under these scenarios, generically assessed different strategies for acquiring casks or the use of casks, and generically assessed cask fabrication capabilities. Issues concerning both domestic and foreign resources were addressed with a focus on the first five years of Federal Waste Management System (FWMS) operation

  15. Control rod operation device

    International Nuclear Information System (INIS)

    Purpose: To reduce operator's operation burdens in the low power state, while moderate his mental burdens upon high power state for the operation of control rod operation device. Constitution: Coordinate of main control rods to be operated, aimed insertion and withdrawal positions and velocity are calculated by the control rod operation sequence and the control rod worth table, to output a control rod selection signal and a control rod operation signal. The control rod operation device conducts extraction or insertion of control rods by these signals. In this way, the operator can automatically operate the control rods by merely manipulating the control rod operation device, by which the operator's operation burden can be reduced in low power state. Further, since the selection of the control rods, the operation speed, etc. are judged by an electronic computer also upon high reactor power state, operator's metal burdens can be moderated. (Kamimura, M.)

  16. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... in Trauma Surgery Advanced Trauma Life Support Verification, Review, and Consultation Program for Hospitals Trauma Systems Consultation ... Your Operation Guidance for after the operation including review of attached equipment and ways for you to ...

  17. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Surgeons and Bundled Payment Models Surgeons as Institutional Employees Our Changing Health Care System ACS Surgery News ... American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation Your Lung Operation DVD ...

  18. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Member Chapter Leader RAS-ACS Leader YFA Leader Leadership & Advocacy Summit Operation Giving Back Operation Giving Back ... Programs Quality Programs Overview About Quality Programs ACS Leadership in Quality ACS Leadership in Quality Inspiring Quality ...

  19. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Education Patients Medical Professionals Skills Programs Find a Treatment Center Patient Safety Resources About the Patient Education ... Liability Reform GME and Workforce Trauma and EMS ... College of Surgeons Education Patients and Family Skills Programs Your Lung Operation Your Lung Operation DVD After Your Operation ...

  20. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Member Chapter Leader RAS-ACS Leader YFA Leader Leadership & Advocacy Summit Operation Giving Back Operation Giving Back Operation Giving Back About OGB Opportunities Resources and Toolkits ... Quality Programs Quality Programs Overview About Quality Programs ACS Leadership in Quality ACS Leadership in Quality Inspiring Quality ...

  1. HFETR operation management

    International Nuclear Information System (INIS)

    Experiences and work methods with High Flux Engineering Test Reactor (HFETR) operation are introduced, which have been accumulated in a long period of operation, in the aspects as reactor operation, test, maintenance, operator training and incident management. It's clear that the safety operation of HFETR has been ensured, and the methods are valid. (authors)

  2. Conduct of operations: establishing operational focus and setting operational standards

    International Nuclear Information System (INIS)

    Due to the nature of our business, we have often tended to focus on the technological aspects of the nuclear industry. The focus of this paper is directed towards the importance of addressing the people skills, attitudes, and 'culture' within, and surrounding, our facilities as key areas of improvement. Within Ontario Hydro Nuclear (OLIN) we have developed the terminology 'event free' operation and 'event free' culture. 'Event Free' recognizes errors as a part of human performance. 'Event Free' takes into account human weaknesses, and provides tools (such as standards) to manage, control, and mitigate errors. In essence, 'Event Free' encompasses two concepts: 1. Prevent errors from occurring; 2. If an error is made, catch it before it can affect safe operation of the facility, learn from the error, and ensure that it does not happen again. In addressing these business realities, Ontario Hydro has identified a number of key support mechanisms and corresponding performance standards that are essential for achieving operating excellence and an 'event free' business culture. This paper will discuss two operational aspects of an 'event free' culture, the first being a set of expectations to enhance the culture, and the second an example of cultural change: 1. Operating Standards - establishing clear expectations for human performance in operating staff; 2. Operational Focus - the understanding that, as a nuclear worker, you should consider every task, activity, in fact everything you do in this business, for the potential to affect safe and reliable operation of a nuclear facility. Note that although the term 'Operational' appears in the title, this concept applies to every individual in the nuclear business, from the cleaner, to the Board of Directors, to the external supplier. (author)

  3. Operating Cash Surplus Determinations

    OpenAIRE

    Teodor HADA

    2009-01-01

    The paper defines the concept of operating surplus. Then, it is compared to the gross operating surplus and the differences are identified. The two calculation methods are presented next: (1) operating revenue less operating charges and (2) the gross operating surplus less WCN (Working capital needs) less immobilised production less stored production less other operating revenues). Then, a three year study is presented (2005-2007) and the results are interpreted. Then, there is a correlation ...

  4. Nilpotent operators similar to irreducible operators

    Institute of Scientific and Technical Information of China (English)

    JIANG; Chunlan

    2001-01-01

    [1]Halmos, P. R., A Hilbert Space Problem Book, Princeton, New Jersey: D Van Nostrand, 1967.[2]Halmos, P. R., Irreducible operators, Mich. Math. J., 1968, 15: 215—223.[3]Voiculescu, D., A non-commutative Weyl-Von Neuwann theorem, Rev. Roum. Math. Pures et, 1976, Appl. 21: 97—113.[4]Gilfeather, F., Strong reducibility of operators., Indiana Univ. Math. J., 1972, 22: 393—397.[5]Jiang, Z. J., Sun, S. L., On completely irreducible operators, Acta Sci. Natur. Univ. Jilin (in Chinese), 1992, 4: 20—29.[6]Fong, C. K., Jiang, C. L., Normal operators similar to irreducible operators, Acta Math. Sinica, New series, 1994, 10: 192—205.[7]Jiang, C. L., Li, X., The irreducible decomposition of Cowen-Douglas operators and operator weighted shifts, Acta Sci. Math. (Szeged), 2000, 48: 1—18.[8]Jiang, C. L., Wu, P. Y., Sums of strongly irreducible operator, Houston. J. Math., 1998, 24: 467—481.[9]Davidson, K. R., Herrero, D. A., The Jordan form of a bitriangular operator., J. Funct. Anal., 1990, 94: 27—73.[10]Herrero, D. A., Approximation of Hilbert Space Operators Research Notes in Math 224, Harlow, Essex: Longman, 1990.[11]Jiang Chunlan, Wang Zongyao, Strongly irreducible operators on Hilbert space, Research Notes in Math 389, Harlow, Essex: Longman, 1998.[12]Tosio Kato, Perturbation Theory for Linear Operators, Berlin, Heidelberg, New York, Tokyo: Springer-Verlag, 1984.

  5. Large orbits of operators and operator semigroups

    Czech Academy of Sciences Publication Activity Database

    Müller, Vladimír

    Bucharest : The Theta Foundation, 2014 - (Gaspar, D.; Timotin, D.; Vasilescu, F.; Zsidó, L.), s. 213-223 ISBN 978-606-8443-04-1. - (Theta Series in Advanced Mathematics. 17). [International Conference in Operator Theory /24th/. Timisoara (RO), 02.07.2012-07.07.2012] R&D Projects: GA ČR GA201/09/0473 Institutional support: RVO:67985840 Keywords : orbits of operators * operator semigroup Subject RIV: BA - General Mathematics

  6. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Operative Management Rural Trauma Team Development Course Disaster Management and Emergency Preparedness Advanced Surgical Skills for Exposure in Trauma Trauma CME Nora Institute ...

  7. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Operative Management Rural Trauma Team Development Course Disaster Management and Emergency Preparedness Advanced Surgical Skills for Exposure in Trauma Trauma CME Nora Institute Nora Institute ...

  8. Multiple operator integrals and higher operator derivatives

    OpenAIRE

    Peller, V. V.

    2005-01-01

    In this paper we consider the problem of the existence of higher derivatives of the function $t\\mapsto\\f(A+tK)$, where $\\f$ is a function on the real line, $A$ is a self-adjoint operator, and $K$ is a bounded self-adjoint operator. We improve earlier results by Sten'kin. In order to do this, we give a new approach to multiple operator integrals. This approach improves the earlier approach given by Sten'kin. We also consider a similar problem for unitary operators.

  9. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Support Trauma Evaluation and Management Advanced Trauma Operative Management Rural Trauma Team Development Course Disaster Management and Emergency Preparedness Advanced Surgical ...

  10. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... NSQIP Annual Conference Trauma Education Trauma Education Trauma Education Advanced Trauma Life Support Trauma Evaluation and Management Advanced Trauma Operative Management Rural Trauma Team Development ...

  11. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Operative Management Rural Trauma Team Development Course Disaster Management and Emergency ... Quality Reporting System Value-Based Payment Modifier DEA, FDA, and Medicare ...

  12. Operating Cash Surplus Determinations

    Directory of Open Access Journals (Sweden)

    Teodor HADA

    2009-01-01

    Full Text Available The paper defines the concept of operating surplus. Then, it is compared to thegross operating surplus and the differences are identified. The two calculationmethods are presented next: (1 operating revenue less operating charges and(2 the gross operating surplus less ΔWCN (Working capital needs lessimmobilised production less stored production less other operating revenues.Then, a three year study is presented (2005-2007 and the results areinterpreted. Then, there is a correlation between the operating cash flow surplusand the operating cash flows.

  13. Foreign Operation Methods

    DEFF Research Database (Denmark)

    Welch, Lawrence S.; Benito, Gabriel R. G.; Petersen, Bent

    Introduction and theory -- Introduction -- Theoretical approaches -- Modes of operation -- Franchising -- Licensing -- Management contracts -- International subcontracting -- Project operations -- Exports -- Alliances -- Foreign direct investment -- Strategies -- Mode switching and stretching...

  14. Boolean Differential Operators

    OpenAIRE

    Catumba, Jorge; Diaz, Rafael

    2012-01-01

    We consider four combinatorial interpretations for the algebra of Boolean differential operators. We show that each interpretation yields an explicit matrix representation for Boolean differential operators.

  15. Saxton Transportation Operations Laboratory

    Data.gov (United States)

    Federal Laboratory Consortium — The Saxton Transportation Operations Laboratory (Saxton Laboratory) is a state-of-the-art facility for conducting transportation operations research. The laboratory...

  16. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Stay Up to Date with ACS Association Management Jobs Events Find a Surgeon Patients and Family Contact My Profile Shop/Donate ( 0 ) Items American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation Your Lung Operation DVD ...

  17. The AECL operator companion

    International Nuclear Information System (INIS)

    As CANDU plants become more complex, and are operated under tighter constraints and for longer periods between outages, plant operations staff will have to absorb more information to correctly and rapidly respond to upsets. A development program is underway at AECL to use expert systems and interactive media tools to assist operations staff of existing and future CANDU plants. The complete system for plant information access and display, on-line advice and diagnosis, and interactive operating procedures is called the Operator Companion. A prototype, consisting of operator consoles, expert systems and simulation modules in a distributed architecture, is currently being developed to demonstrate the concepts of the Operator Companion

  18. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Mentoring for Excellence in Trauma Surgery Advanced Trauma Life Support Verification, Review, and Consultation Program for Hospitals ... Trauma Education Trauma Education Trauma Education Advanced Trauma Life Support Trauma Evaluation and Management Advanced Trauma Operative ...

  19. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Stay Up to Date with ACS Association Management Jobs Events Find a Surgeon Patients and Family Contact My Profile Shop/Donate ( 0 ) Items American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation ...

  20. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Project Project Goals and Activities Stakeholder Organizations Project Team Resources News Contact Us ACS NSQIP Pediatric ACS ... and Management Advanced Trauma Operative Management Rural Trauma Team Development Course Disaster Management and Emergency Preparedness Advanced ...

  1. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Quality Reporting System MOC Part 4 and Recertification Software and Registration SSR Webinars SSR Login Trauma Trauma ... Management Advanced Trauma Operative Management Rural Trauma Team Development Course Disaster Management and Emergency Preparedness Advanced Surgical ...

  2. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Operative Management Rural Trauma Team Development Course Disaster Management and Emergency Preparedness Advanced Surgical Skills for Exposure in Trauma Trauma CME Nora Institute Nora Institute for Surgical Patient Safety Nora Institute ...

  3. Your Lung Operation: After Your Operation

    Science.gov (United States)

    ... NSQIP Annual Conference Trauma Education Trauma Education Trauma Education Advanced Trauma Life Support Trauma Evaluation and Management Advanced Trauma Operative Management Rural Trauma Team Development Course Disaster Management and Emergency ...

  4. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Quality Reporting System MOC Part 4 and Recertification Software and Registration SSR Webinars SSR Login Trauma Trauma ... Education Trauma Education Advanced Trauma Life Support Trauma Evaluation and Management Advanced Trauma Operative Management Rural Trauma ...

  5. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... NSQIP Annual Conference Trauma Education Trauma Education Trauma Education Advanced Trauma Life Support Trauma Evaluation and Management Advanced Trauma Operative Management Rural Trauma Team Development Course Disaster Management and Emergency Preparedness Advanced Surgical ...

  6. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Education Trauma Education Advanced Trauma Life Support Trauma Evaluation and Management Advanced Trauma Operative Management Rural Trauma ... and Family Contact My Profile Shop/Donate ( 0 ) Items American College of Surgeons Education Patients and Family ...

  7. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Program Program for Validation and Verification of Surgical Knowledge and Skills Resources Educational Resources Educational Resources E- ... Education Advanced Trauma Life Support Trauma Evaluation and Management Advanced Trauma Operative Management Rural Trauma Team Development ...

  8. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Programs Educational Programs SESAP SESAP Sampler SRGS ACS Fundamentals of Surgery Curriculum Transition to Practice Program ACS/ ... Education Advanced Trauma Life Support Trauma Evaluation and Management Advanced Trauma Operative Management Rural Trauma Team Development ...

  9. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... NSQIP Annual Conference Trauma Education Trauma Education Trauma Education Advanced Trauma Life Support Trauma Evaluation and Management Advanced Trauma Operative Management Rural Trauma Team Development Course Disaster Management and Emergency ...

  10. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... ACS Insurance Programs ACS Discount Programs FACS Resources Career Connection Update Your Profile Scholarships, Fellowships, and Awards ... Management Advanced Trauma Operative Management Rural Trauma Team Development Course Disaster Management and Emergency Preparedness Advanced Surgical ...

  11. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Life Support Trauma Evaluation and Management Advanced Trauma Operative Management Rural Trauma Team Development Course Disaster Management ... Program Medicare Inpatient & Outpatient Rules Physician Quality Reporting System Value-Based Payment Modifier DEA, FDA, and Medicare ...

  12. Computer algebra and operators

    Science.gov (United States)

    Fateman, Richard; Grossman, Robert

    1989-01-01

    The symbolic computation of operator expansions is discussed. Some of the capabilities that prove useful when performing computer algebra computations involving operators are considered. These capabilities may be broadly divided into three areas: the algebraic manipulation of expressions from the algebra generated by operators; the algebraic manipulation of the actions of the operators upon other mathematical objects; and the development of appropriate normal forms and simplification algorithms for operators and their actions. Brief descriptions are given of the computer algebra computations that arise when working with various operators and their actions.

  13. Operating System Security

    CERN Document Server

    Jaeger, Trent

    2008-01-01

    Operating systems provide the fundamental mechanisms for securing computer processing. Since the 1960s, operating systems designers have explored how to build "secure" operating systems - operating systems whose mechanisms protect the system against a motivated adversary. Recently, the importance of ensuring such security has become a mainstream issue for all operating systems. In this book, we examine past research that outlines the requirements for a secure operating system and research that implements example systems that aim for such requirements. For system designs that aimed to

  14. Training and Tactical Operationally Responsive Space Operations

    Science.gov (United States)

    Sorensen, B.; Strunce, R., Jr.

    Current space assets managed by traditional space system control resources provide communication, navigation, intelligence, surveillance, and reconnaissance (ISR) capabilities using satellites that are designed for long life and high reliability. The next generation Operationally Responsive Space (ORS) systems are aimed at providing operational space capabilities which will provide flexibility and responsiveness to the tactical battlefield commander. These capabilities do not exist today. The ORS communication, navigation, and ISR satellites are being designed to replace or supplement existing systems in order to enhance the current space force. These systems are expected to rapidly meet near term space needs of the tactical forces. The ORS concept includes new tactical satellites specifically designed to support contingency operations such as increased communication bandwidth and ISR imagery over the theater for a limited period to support air, ground, and naval force mission. The Concept of Operations (CONOPS) that exists today specifies that in addition to operational control of the satellite, the tasking and scheduling of the ORS tactical satellite for mission data collection in support of the tactical warfighter will be accomplished within the Virtual Mission Operations Center (VMOC). This is very similar to what is currently being accomplished in a fixed Mission Operations Center on existing traditional ISR satellites. The VMOC is merely a distributed environment and the CONOPS remain virtually the same. As a result, there is a significant drawback to the current ORS CONOPS that does not account for the full potential of the ORS paradigm for supporting tactical forces. Although the CONOPS approach may be appropriate for experimental Tactical Satellites (TacSat), it ignores the issues associated with the In-Theater Commander's need to own and operate his dedicated TacSat for most effective warfighting as well as the Warfighter specific CONOPS. What is needed

  15. Plant operation monitor

    International Nuclear Information System (INIS)

    An operation monitor for a neutron injection device comprises a transmission time zone control means for judging, determining and outputting a transmission enabling time and a transmission disabling time by operation cycle data and a standard timing, and a operation value transmission control means for demanding operation value transmission only during the transmission enabling time. The transmission time zone control means judges and controls the time zone for changing the plant operation value and changes the operation value only when the plant is in a stand-by state and transmission is possible. The operation value is not changed during operation. Since transmission is conducted while avoiding the plant operation period in which the computer load is great, the load is dispersed. Since it is not necessary for an operator to pay attention separately to a plant operation period or a stand-by state and he can always demand an operation value change, time control is easy and operator's psychological burden is reduced. (N.H.)

  16. Major operations and activities

    International Nuclear Information System (INIS)

    This section of the 1994 Hanford Site Environmental Report summarizes the major operations and activities on the site. These operations and activities include site management, waste management, environmental restoration and corrective actions, and research and technology development

  17. Crew Transportation Operations Standards

    Science.gov (United States)

    Mango, Edward J.; Pearson, Don J. (Compiler)

    2013-01-01

    The Crew Transportation Operations Standards contains descriptions of ground and flight operations processes and specifications and the criteria which will be used to evaluate the acceptability of Commercial Providers' proposed processes and specifications.

  18. Boiler operator's handbook

    CERN Document Server

    Heselton, Ken

    2004-01-01

    Containing key information for operators and managers of large and small plants, this is an indispensable guide for those at advanced and early stages of their careers, as well as for managers interested in reducing operating expenses.

  19. Launch operations efficiency

    Science.gov (United States)

    Diloreto, Clem; Fischer, Carl; Atkins, Bob

    1988-01-01

    The paper discusses launch operations from a program perspective. Launch operations cost is a significant part of program cost. New approaches to launch operations, integrated with lessons learned, have the potential to increase safety and reliability as well as reduce cost. Operational efficiency must be an initial program goal. Design technology and management philosophy must be implemented early to ensure operational cost goals. Manufacturing cost and launch cost are related to operational efficiency. True program savings can be realized through implementation of launch operations cost saving approaches which do not correspondingly increase cost in other program areas such as manufacturing and software development and maintenance. Launch rate is a key factor in the cost/flight analysis and the determination of launch operations efficiency goals.

  20. Vessel Operator System

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Operator cards are required for any operator of a charter/party boat and or a commercial vessel (including carrier and processor vessels) issued a vessel permit...

  1. Major operations and activities

    Energy Technology Data Exchange (ETDEWEB)

    Black, D.G.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the major operations and activities on the site. These operations and activities include site management, waste management, environmental restoration and corrective actions, and research and technology development.

  2. Operational Risk - Scenario Analysis

    OpenAIRE

    Rippel, Milan; Teplý, Petr

    2008-01-01

    Operational risk management and measurement has been paid an increasing attention in last years. The main two reasons are the Basel II requirements that were to be complied with by all international active financial institutions by the end of 2006 and recent severe operational risk loss events. This paper focuses on operational risk measurement techniques and on economic capital estimation methods. A data sample of operational losses provided by an anonymous Central European bank is analyzed ...

  3. Unix operating system

    CERN Document Server

    Liu, Yukun; Guo, Liwei

    2011-01-01

    ""UNIX Operating System: The Development Tutorial via UNIX Kernel Services"" introduces the hierarchical structure, principles, applications, kernel, shells, development, and management of the UNIX operation systems multi-dimensionally and systematically. It clarifies the natural bond between physical UNIX implementation and general operating system and software engineering theories, and presents self-explanatory illustrations for readers to visualize and understand the obscure relationships and intangible processes in UNIX operating system. This book is intended for engineers and researchers

  4. Mobile Operating Systems

    Directory of Open Access Journals (Sweden)

    Vipin Kamboj

    2012-04-01

    Full Text Available Mobile phones are used by every people in today’s life. We use mobile phones without knowing the different factors that a mobile used including its technology, operating system, CPU ,RAM etc. Many types of operating system are used by different mobile. Every operating system has their advantage

  5. Operations and maintenance philosophy

    International Nuclear Information System (INIS)

    This Operations and Maintenance (O and M) Philosophy document is intended to establish a future O and M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O and M lessons learned into on-going and future project upgrades

  6. Health care operations management

    OpenAIRE

    Carter, M W; Hans, E.W.; Kolisch, R.

    2012-01-01

    Health care operations management has become a major topic for health care service providers and society. Operations research already has and further will make considerable contributions for the effective and efficient delivery of health care services. This special issue collects seven carefully selected papers dealing with optimization and decision analysis problems in the field of health care operations management.

  7. Mobile Operating Systems

    OpenAIRE

    Vipin Kamboj; Hitesh Gupta

    2012-01-01

    Mobile phones are used by every people in today’s life. We use mobile phones without knowing the different factors that a mobile used including its technology, operating system, CPU ,RAM etc. Many types of operating system are used by different mobile. Every operating system has their advantage

  8. The Replace Operator

    CERN Document Server

    Karttunen, L

    1995-01-01

    This paper introduces to the calculus of regular expressions a replace operator, ->, and defines a set of replacement expressions that concisely encode several alternate variations of the operation. The basic case is unconditional obligatory replacement: UPPER -> LOWER Conditional versions of replacement, such as, UPPER -> LOWER || LEFT _ RIGHT constrain the operation by left and right contexts. UPPER, LOWER, LEFT, and RIGHT may be regular expressions of any complexity. Replace expressions denote regular relations. The replace operator is defined in terms of other regular expression operators using techniques introduced by Ronald M. Kaplan and Martin Kay in "Regular Models of Phonological Rule Systems" (Computational Linguistics 20:3 331-378. 1994).

  9. Cyclotron operations and development

    International Nuclear Information System (INIS)

    The 60 in. cyclotron is now in its 34th year of continuous operation. Maintaining the cyclotron in operating condition required installation of a new oscillator tube, replacement of the variac coils on the main magnet power supply and overhaul of the main magnet oil circulating pump. The new University Hospital clinical neutron therapy cyclotron is now operating so that cancer therapy operations at the 60 in. cyclotron stopped at the end of February, 1984. Calcium measurements will continue for the near future. The machine ran 908 hours between April 16, 1983 and April 15, 1984. Other statistics of cyclotron operations are given

  10. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  11. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... About the ACS Catalog Find a Product Contribute Education Journal of the American College of Surgeons About JACS ... News Stay Up to Date with ACS Association ... ( 0 ) Items American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation ...

  12. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Skills Resources Educational Resources Educational Resources E-Learning Evidence-Based Decisions in Surgery Medical Student Resources So You ... APDS/ASE Resident Prep Curriculum Medical Student Simulation-Based Surgical Skills Curriculum ... Advanced Trauma Operative Management Rural Trauma Team Development ...

  13. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Contact My Profile Shop/Donate ( 0 ) Items American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation ... facs.org Copyright © 1996-2016 by the American College of Surgeons, Chicago, IL 60611-3211 | Privacy Policy | Terms of Use

  14. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... for you to actively participate to prevent high-risk complications such as pneumonia and deep vein thrombosis. Jump to: The Day of Your Lung Operation Read Next Your Discharge and Recovery Back to Top Find A Surgeon Information For Patients and Family Surgeons Residents and Associates ...

  15. Sustainable Building Operation

    DEFF Research Database (Denmark)

    Jensen, Jesper Ole

    2009-01-01

    practical experiences from Danish housing estates indicates that there are large potentials for energy savings by focusing on the operation of the buildings. We suggest that in order to achieve sustainability in the existing housing, renovation and operations should be seen as integrated parts and that...... sustainable building operation can pave the way for sustainable building renovation. This paper discusses the use of sustainability building operation in Danish housing estates: Which tools, methods and technologies is being used, where are the barriers and where are the potentials? We define sustainable...... sustainable building operation and a survey amongst building administrators from the private and the social housing sector. Our results show that there are many good examples on sustainable building operation in Danish housing estates, where local building managers, residents etc. have gained impressive...

  16. Global Operations Networks

    DEFF Research Database (Denmark)

    , international comparative studies providing comprehensive insights from it are still rare. With the objective of bridging this gap, Global Operations Networks (GONE) project (sponsored by the Danish Research Council) brought together numerous academic and industrial partners from Denmark, Sweden and Finland...... of global operations and operations strategy. This summative volume utilises the rich and diverse empirical foundation generated during the project activities in Denmark, Sweden and Finland. Chapters of the book are based on quantitative data and multiple case studies which the project partners have been...... closely working with, and which are best suited to illuminate a particular aspect of organising and managing global operations in networks. The book addresses the following broadly defined themes: • Contexts of global operations networks, • Configurations of global operations networks, • Capabilities...

  17. Cask fleet operations study

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system.

  18. Cask fleet operations study

    International Nuclear Information System (INIS)

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system

  19. Network operating system

    Science.gov (United States)

    1985-01-01

    Long-term and short-term objectives for the development of a network operating system for the Space Station are stated. The short-term objective is to develop a prototype network operating system for a 100 megabit/second fiber optic data bus. The long-term objective is to establish guidelines for writing a detailed specification for a Space Station network operating system. Major milestones are noted. Information is given in outline form.

  20. Soviet naval operational art.

    OpenAIRE

    Kern, David Jeffery

    1988-01-01

    The Soviet theory of naval operational art is a body of knowledge which focuses the tactical capabilities of the Soviet Navy on achieving the strategic missions assigned them by the leadership of the Soviet Union. This body of knowledge guides the creation and execution of Soviet naval operations. Soviet military science establishes the theoretical foundation for the conduct of independent naval operations. Soviet troop control creates the planning processes by which Soviet naval commanders p...

  1. Linux & Windows Operating Systems

    OpenAIRE

    Chawan, Pramila; Rathod, Vasundhara; Chim, Monali

    2013-01-01

    Comparisons between the Microsoft Windows and Linux computer operating systems are a long-running discussion topic within the personal computer industry. Throughout the entire period of the Windows 9x systems through the introduction of Windows 7, Windows has retained an extremely large retail sales majority among operating systems for personal desktop use, while Linux has sustained its status as the most prominent Free Software and Open Source operating system. After their initial clash, bot...

  2. Improving operating room safety

    OpenAIRE

    Garrett Jill; Hurlbert Scott N

    2009-01-01

    Abstract Despite the introduction of the Universal Protocol, patient safety in surgery remains a daily challenge in the operating room. This present study describes one community health system's efforts to improve operating room safety through human factors training and ultimately the development of a surgical checklist. Using a combination of formal training, local studies documenting operating room safety issues and peer to peer mentoring we were able to substantially change the culture of ...

  3. Relativistic Spin Operators

    Institute of Scientific and Technical Information of China (English)

    ZHANG Peng-Fei; RUAN Tu-Nan

    2001-01-01

    A systematic theory on the appropriate spin operators for the relativistic states is developed. For a massive relativistic particle with arbitrary nonzero spin, the spin operator should be replaced with the relativistic one, which is called in this paper as moving spin. Further the concept of moving spin is discussed in the quantum field theory. A new is constructed. It is shown that, in virtue of the two operators, problems in quantum field concerned spin can be neatly settled.

  4. Canonical Big Operators

    OpenAIRE

    Bertot, Yves; Gonthier, Georges; Ould Biha, Sidi; Pasca, Ioana

    2008-01-01

    In this paper, we present an approach to describe uniformly iterated “big” operations and to provide lemmas that encapsulate all the commonly used reasoning steps on these constructs. We show that these iterated operations can be handled generically using the syntactic notation and canonical structure facilities provided by the Coq system. We then show how these canonical big operations played a crucial enabling role in the study of various parts of linear algebra and multi-dimensional real a...

  5. Lattice Operators and Topologies

    OpenAIRE

    Eva Cogan

    2009-01-01

    Working within a complete (not necessarily atomic) Boolean algebra, we use a sublattice to define a topology on that algebra. Our operators generalize complement on a lattice which in turn abstracts the set theoretic operator. Less restricted than those of Banaschewski and Samuel, the operators exhibit some surprising behaviors. We consider properties of such lattices and their interrelations. Many of these properties are abstractions and generalizations of topological spaces. The approach is...

  6. Purge ventilation operability

    International Nuclear Information System (INIS)

    A determination of minimum requirements for purge exhaust ventilation system operability has been performed. HLWE and HLW Regulatory Program personnel have evaluated the various scenarios of equipment conditions and HLWE has developed the requirements for purge exhaust systems. This report is provided to document operability requirements to assist Tank Farm personnel to determine whether a system is operable/inoperable and to define required compensatory actions

  7. Operator interface programs for KSTAR operation

    International Nuclear Information System (INIS)

    Beginning the first plasma discharging experiment of KSTAR since 2008, KSTAR performed the third plasma discharging experiment by 2010. During the experiment of three times, KSTAR OPerator Interface (OPI) programs have been developed for KSTAR operation by itself. OPI programs used in KSTAR were implemented by KSTAR widget plug-in Toolkit (KWT). The KWT means the plug-in library implemented by Qt-based user interface development software. The main purpose of developing the KWT library is to implement full automation libraries having interface with the automated EPICS channel access (CA) guaranteeing the flexibility for requirements of operators. In addition, it has advantages in minimizing human code error and maximizing utilization of the limited human resource. According to the increasing of control systems, a number of OPI servers connected to one EPICS gateway server caused the connection problem and increased the amount of the network data packets. To solve these problems, an algorithm of “CachedChannelAccess” for shared memory base was implemented into an inner logic of the KWT library. KSTAR control system monitoring (CSM) program is one of applications developed by using KWT library. The function of CSM program is to notify alarm to operators by checking health status of every server's network health status and resource (cpu, memory, network packets, disk usage rate and system/user defined process) usage state. Another application is a post-shot sequencing program which is activated after every shot is completed. This application is to display major plasma parameters and diagnostic data in chart form, to save this data to database, and to transfer a chart image file to a web server. This paper describes the technical details how to develop OPI applications which have high productivity using Qt on the EPICS-based control system

  8. Operational Transformation In Co-Operative Editing

    Directory of Open Access Journals (Sweden)

    Mandeep Kaur

    2015-08-01

    Full Text Available Cooperative Editing Systems in real-time allows a virtual team to view and edit a shared document at the same time. The document shared must be synchronized in order to ensure consistency for all the participants. This paper describes the Operational Transformation the evolution of its techniques its various applications major issues and achievements. In addition this paper will present working of a platform where two users can edit a code programming file at the same time.

  9. Airline Operation Center Workstation

    Data.gov (United States)

    Department of Transportation — The Airline Operation Center Workstation (AOC Workstation) represents equipment available to users of the National Airspace system, outside of the FAA, that enables...

  10. Licensed operating reactors

    International Nuclear Information System (INIS)

    The Operating Units Status Report --- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff on NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non- power reactors in the US

  11. Licensed operating reactors

    International Nuclear Information System (INIS)

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the errata page

  12. Implications for Operations

    Science.gov (United States)

    Arduini, G.; Lamont, M.; Pieloni, T.; Rumolo, G.

    The HL-LHC will introduce a number of novel operational features and challenges including luminosity leveling. After a brief recap of the possible leveling techniques, the potential impact of the operational regime on overall efficiency is discussed. A breakdown of the operational cycle and the standard operational year, together with a discussion of fault time is presented. The potential performance is then explored and estimates of the required machine availability and efficiency for 250 fb-1 per year are given. Finally the e-cloud challenges, scrubbing runs requirements, and machine development potential are outlined.

  13. Operational safety reliability research

    International Nuclear Information System (INIS)

    Operating reactor events such as the TMI accident and the Salem automatic-trip failures raised the concern that during a plant's operating lifetime the reliability of systems could degrade from the design level that was considered in the licensing process. To address this concern, NRC is sponsoring the Operational Safety Reliability Research project. The objectives of this project are to identify the essential tasks of a reliability program and to evaluate the effectiveness and attributes of such a reliability program applicable to maintaining an acceptable level of safety during the operating lifetime at the plant

  14. International co-operation

    International Nuclear Information System (INIS)

    Within the Union Nations (UN) framework, the Slovak Republic participated in following activities on environment protection co-operation: UN European Economic Commission, UN Industrial Development Organization, UN Development Programme, UN Human Habitat Organization, UN Environment Programme, and UN Commission on Sustainable Development. Relevant activities of the Slovak Republic in these co-operations as well as in European Union and OECD activities are reviewed. International conventions and other forms of multilateral co-operation, bilateral co-operation, and international programmes and projects in which the Slovak Republic took participate are presented

  15. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  16. Operational Modal Analysis Tutorial

    DEFF Research Database (Denmark)

    Brincker, Rune; Andersen, Palle

    In this paper the basic principles in operational modal testing and analysis are presented and discussed. A brief review of the techniques for operational modal testing and identification is presented, and it is argued, that there is now a wide range of techniques for effective identification of...... modal parameters of practical interest - including the mode shape scaling factor - with a high degree of accuracy. It is also argued that the operational technology offers the user a number of advantages over traditional modal testing. The operational modal technology allows the user to perform a modal...

  17. Operators on Hilbert space

    CERN Document Server

    Sunder, V S

    2016-01-01

    The primarily objective of the book is to serve as a primer on the theory of bounded linear operators on separable Hilbert space. The book presents the spectral theorem as a statement on the existence of a unique continuous and measurable functional calculus. It discusses a proof without digressing into a course on the Gelfand theory of commutative Banach algebras. The book also introduces the reader to the basic facts concerning the various von Neumann–Schatten ideals, the compact operators, the trace-class operators and all bounded operators. .

  18. Implications for operations

    CERN Document Server

    Arduini, G; Pieloni, T; Rumolo, G

    2015-01-01

    The HL-LHC will introduce a number of novel operational features and challenges including luminosity leveling. After a brief recap of the possible leveling techniques, the potential impact of the operational regime on overall efficiency is discussed. A breakdown of the operational cycle and the standard operational year, together with a discussion of fault time is presented. The potential performance is then explored and estimates of the required machine availability and efficiency for 250 fb−1 per year are given. Finally the e-cloud challenges, scrubbing runs requirements, and machine development potential are outlined.

  19. Crane and Excavator Operator.

    Science.gov (United States)

    Marine Corps Inst., Washington, DC.

    Developed as part of the Marine Corps Institute (MCI) correspondence training program, this course on crane and excavator operation is designed to enable the crane and excavator operator to perform his/her duties more proficiently. Introductory materials include specific information for MCI students, a course introduction, and a study guide…

  20. Custodial Operations: Green & Sustainable

    Science.gov (United States)

    Campbell, J. Kirk

    2008-01-01

    Custodial Operations can have a significant impact on institutional green and sustainable goals if given the proper support and challenge. This article describes the green and sustainable custodial operations in place at Carleton College in Northfield, Minnesota. The article reviews the college's sustainable efforts on biodegradables, packaging,…

  1. Mission Operations Assurance

    Science.gov (United States)

    Faris, Grant

    2012-01-01

    Integrate the mission operations assurance function into the flight team providing: (1) value added support in identifying, mitigating, and communicating the project's risks and, (2) being an essential member of the team during the test activities, training exercises and critical flight operations.

  2. Generalizations of OWA Operators

    Czech Academy of Sciences Publication Activity Database

    Mesiar, Radko; Stupňanová, A.; Yager, R. R.

    2015-01-01

    Roč. 23, č. 6 (2015), s. 2154-2152. ISSN 1063-6706 Institutional support: RVO:67985556 Keywords : Choquet integral * ordered modular average (OMA) operator * ordered weighted average (OWA) operator Subject RIV: BA - General Mathematics Impact factor: 8.746, year: 2014 http://library.utia.cas.cz/separaty/2015/E/mesiar-0453103.pdf

  3. Operation plan : Alviso System

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the operation plan for ponds A2W, A3W, A7, A14, and A16 in the Alviso System at San Francisco Bay NWR Complex. Operating instructions for both winter and...

  4. Planning the operation.

    Science.gov (United States)

    Kiely, Edward M; Spitz, Lewis

    2015-10-01

    The management of conjoined twins falls into three distinct groups-non-operative, emergency separation and elective separation. Planning meetings involving all the personnel who will be required during the operation are held. The radiological findings are presented and the anaesthetic, nursing and intensive care requirements are highlighted. PMID:26382260

  5. CANDU operating experience

    International Nuclear Information System (INIS)

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This paper highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations both to the workers and the public

  6. Special Operation. Module 20.

    Science.gov (United States)

    South Carolina State Dept. of Education, Columbia. Office of Vocational Education.

    This module on special operations, one in a series dealing with industrial sewing machines, their attachments, and operation, covers two topics: topstitching and mitering. For each topic these components are provided: an introduction, directions, an objective, learning activities, student information, a student self-check, and a check-out…

  7. Instruction sequence processing operators

    NARCIS (Netherlands)

    J.A. Bergstra; C.A. Middelburg

    2009-01-01

    This paper concerns instruction sequences whose execution involves the processing of instructions by an execution environment that offers a family of services and may yield a Boolean value at termination. We introduce a composition operator for families of services and three operators that have a di

  8. On Real Operator Spaces

    Institute of Scientific and Technical Information of China (English)

    Zhong Jin RUAN (Zhong-Jin Ruan)

    2003-01-01

    During the last ten to fifteen years , a lot of progress has been achieved in the study ofcomplex operator spaces. In this paper, we show that a corresponding theory can be developed forreal operator spaces. With some appropriate modifications, many complex results still hold for realoperator spaces.

  9. Operation auxiliary system (SAO)

    International Nuclear Information System (INIS)

    This work presents an auxiliary system for nuclear power plants operation (SAO). The development purpose consisted in a computing supervision system to be installed at different sites of a reactor, mainly in the control room. The inclusion of this system to a nuclear power plant minimizes the possibility of human error for the facility operation. (Author)

  10. Stirling machine operating experience

    Science.gov (United States)

    Ross, Brad A.; Dudenhoefer, James E.

    1991-01-01

    Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that Stirling machines are capable of reliable and lengthy lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and were not expected to operate for any lengthy period of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered.

  11. Assessing Operational Situations

    DEFF Research Database (Denmark)

    Zhang, Xinxin

    In spite of the high level of automation commonly applied to today’s engineering system, humans’ skill and knowledge still plays a central role in the systems’ daily operation, critical decision making, and accident management. The complexity of the engineered system poses great challenge for human...... operators to perceive and understand the operational situation. The research domain of situation awareness approaches the operational challenges from the human cognition perspective while the presented thesis aims at supporting situation assessment from the system perspective. The thesis has reviewed...... different perspectives on situation awareness in the human factor studies and uses the knowledge reflectively for system representation and analysis. The human cognitive activities during complex plant operation and how they perceive a situation and what kind of knowledge has to be established in the human...

  12. Modern operating systems

    CERN Document Server

    Tanenbaum, Andrew S

    2015-01-01

    Modern Operating Systems, Fourth Edition, is intended for introductory courses in Operating Systems in Computer Science, Computer Engineering, and Electrical Engineering programs. It also serves as a useful reference for OS professionals ' The widely anticipated revision of this worldwide best-seller incorporates the latest developments in operating systems (OS) technologies. The Fourth Edition includes up-to-date materials on relevant'OS. Tanenbaum also provides information on current research based on his experience as an operating systems researcher. ' Modern Operating Systems, Third Editionwas the recipient of the 2010 McGuffey Longevity Award. The McGuffey Longevity Award recognizes textbooks whose excellence has been demonstrated over time.'http://taaonline.net/index.html " Teaching and Learning Experience This program will provide a better teaching and learning experience-for you and your students. It will help: ' *Provide Practical Detail on the Big Picture Concepts: A clear and entertaining writing s...

  13. Advanced Tele-operation

    International Nuclear Information System (INIS)

    Maintenance, repair, and dismantling operations in nuclear facilities have to be performed remotely when high radiation doses exclude hands-on operation, but also to minimize contamination risks and occupational doses to the operators. Computer-aided and sensor-based tele-operation enhances safety, reliability, and performance by helping the operator in difficult tasks with poor remote environmental perception. The objectives of work in this domain are to increase the scientific knowledge of the studied phenomena, to improve the interpretation of data, to improve the piloting og experimental devices during irradiation, to reveal and to understand possible unexpected phenomena occurring during irradiation. This scientific report describes the achievements for 1997 in the area of radiation tolerance for of remote-sensing, optical fibres and optical fibre sensors

  14. Basic operator theory

    CERN Document Server

    Gohberg, Israel

    2001-01-01

    rii application of linear operators on a Hilbert space. We begin with a chapter on the geometry of Hilbert space and then proceed to the spectral theory of compact self adjoint operators; operational calculus is next presented as a nat­ ural outgrowth of the spectral theory. The second part of the text concentrates on Banach spaces and linear operators acting on these spaces. It includes, for example, the three 'basic principles of linear analysis and the Riesz­ Fredholm theory of compact operators. Both parts contain plenty of applications. All chapters deal exclusively with linear problems, except for the last chapter which is an introduction to the theory of nonlinear operators. In addition to the standard topics in functional anal­ ysis, we have presented relatively recent results which appear, for example, in Chapter VII. In general, in writ­ ing this book, the authors were strongly influenced by re­ cent developments in operator theory which affected the choice of topics, proofs and exercises. One ...

  15. NSI operations center

    Science.gov (United States)

    Zanley, Nancy L.

    1991-01-01

    The NASA Science Internet (NSI) Network Operations Staff is responsible for providing reliable communication connectivity for the NASA science community. As the NSI user community expands, so does the demand for greater interoperability with users and resources on other networks (e.g., NSFnet, ESnet), both nationally and internationally. Coupled with the science community's demand for greater access to other resources is the demand for more reliable communication connectivity. Recognizing this, the NASA Science Internet Project Office (NSIPO) expands its Operations activities. By January 1990, Network Operations was equipped with a telephone hotline, and its staff was expanded to six Network Operations Analysts. These six analysts provide 24-hour-a-day, 7-day-a-week coverage to assist site managers with problem determination and resolution. The NSI Operations staff monitors network circuits and their associated routers. In most instances, NSI Operations diagnoses and reports problems before users realize a problem exists. Monitoring of the NSI TCP/IP Network is currently being done with Proteon's Overview monitoring system. The Overview monitoring system displays a map of the NSI network utilizing various colors to indicate the conditions of the components being monitored. Each node or site is polled via the Simple Network Monitoring Protocol (SNMP). If a circuit goes down, Overview alerts the Network Operations staff with an audible alarm and changes the color of the component. When an alert is received, Network Operations personnel immediately verify and diagnose the problem, coordinate repair with other networking service groups, track problems, and document problem and resolution into a trouble ticket data base. NSI Operations offers the NSI science community reliable connectivity by exercising prompt assessment and resolution of network problems.

  16. Managing for operational effectiveness

    International Nuclear Information System (INIS)

    In today's environment, management matters are the key drivers of plant performance and cost. By managing for operational effectiveness, utilities address questions regarding nuclear power plant operations and maintenance of importance to senior management. These issues include program safety, reliability, and cost-effectiveness. Responsibility for these vital nuclear issues is moved up in the organization, yet all functional areas of the organization are involved. A four-step approach to managing for operational effectiveness is recommended. It includes the implementation of management policies through suitable processes involving people and appropriate corporate programs

  17. Global Operations Coevolution

    DEFF Research Database (Denmark)

    Slepniov, Dmitrij; Wæhrens, Brian Vejrum; Gubi, Ebbe

    2013-01-01

    systemic approach to control and coordination, which emphasizes not only short-term operational efficiency, but also increasingly long-term strategic effectiveness. The findings advance coevolutionary perspectives on the integration of globally dispersed business systems spanning multiple levels of...... analysis and involving temporal adaptations. In terms of managerial implications, the study provides managers with lessons for designing a robust system of globally dispersed operations.......Companies are actively seeking competitive advantage through their choice of location and ownership of operations. The purpose of this chapter is to uncover hidden effects of this development and propose how companies can respond to them. The chapter draws on a case study of a Danish industrial...

  18. Computer system operation

    International Nuclear Information System (INIS)

    The report described the operation and the trouble shooting of main computer and KAERINet. The results of the project are as follows; 1. The operation and trouble shooting of the main computer system. (Cyber 170-875, Cyber 960-31, VAX 6320, VAX 11/780). 2. The operation and trouble shooting of the KAERINet. (PC to host connection, host to host connection, file transfer, electronic-mail, X.25, CATV etc.). 3. The development of applications -Electronic Document Approval and Delivery System, Installation the ORACLE Utility Program. 22 tabs., 12 figs. (Author) .new

  19. Operator spin foam models

    Energy Technology Data Exchange (ETDEWEB)

    Bahr, Benjamin [DAMTP, Centre for Mathematical Sciences, Wilberforce Road, Cambridge CB3 0WA (United Kingdom); Hellmann, Frank; Kaminski, Wojciech; Kisielowski, Marcin; Lewandowski, Jerzy [Instytut Fizyki Teoretycznej, Uniwersytet Warszawski, ul. Hoza 69, 00-681 Warszawa (Warsaw), Polska. Poland (Poland)

    2011-05-21

    The goal of this paper is to introduce a systematic approach to spin foams. We define operator spin foams, that is foams labelled by group representations and operators, as our main tool. A set of moves we define in the set of the operator spin foams (among other operations) allows us to split the faces and the edges of the foams. We assign to each operator spin foam a contracted operator, by using the contractions at the vertices and suitably adjusted face amplitudes. The emergence of the face amplitudes is the consequence of assuming the invariance of the contracted operator with respect to the moves. Next, we define spin foam models and consider the class of models assumed to be symmetric with respect to the moves we have introduced, and assuming their partition functions (state sums) are defined by the contracted operators. Briefly speaking, those operator spin foam models are invariant with respect to the cellular decomposition, and are sensitive only to the topology and colouring of the foam. Imposing an extra symmetry leads to a family we call natural operator spin foam models. This symmetry, combined with assumed invariance with respect to the edge splitting move, determines a complete characterization of a general natural model. It can be obtained by applying arbitrary (quantum) constraints on an arbitrary BF spin foam model. In particular, imposing suitable constraints on a spin(4) BF spin foam model is exactly the way we tend to view 4D quantum gravity, starting with the BC model and continuing with the Engle-Pereira-Rovelli-Livine (EPRL) or Freidel-Krasnov (FK) models. That makes our framework directly applicable to those models. Specifically, our operator spin foam framework can be translated into the language of spin foams and partition functions. Among our natural spin foam models there are the BF spin foam model, the BC model, and a model corresponding to the EPRL intertwiners. Our operator spin foam framework can also be used for more general spin

  20. CANDU operating experience

    International Nuclear Information System (INIS)

    The CANDU-PHW program is based upon 38 years of heavy water reactor experience with 35 years of operating experience. Canada has had 72 reactor years of nuclear-electric operations experience with 10 nuclear units in 4 generating stations during a period of 18 years. All objectives have been met with outstanding performance: worker safety, public safety, environmental emissions, reliable electricity production, and low electricity cost. The achievement has been realized through total teamwork involving all scientific disciplines and all project functions (research, design, manufacturing, construction, and operation). (auth)

  1. Plant operation method

    International Nuclear Information System (INIS)

    A precoating material is coated on the surface of a hollow thread membrane filter before the start-up operation of a plant. With such a constitution, since the precoating material captures solid materials to prevent them from reaching the surface of the membrane of the filter when the clogging-promoting solid materials are present in condensates, the clogging of the filter membrane can be suppressed effectively. In addition, since the precoating operation is limited to the time before the actuation operation, the increase of the amount of wastes can be minimized. (T.M.)

  2. Inter-operability

    International Nuclear Information System (INIS)

    Building an internal gas market implies establishing harmonized rules for cross border trading between operators. To that effect, the European association EASEE-gas is carrying out standards and procedures, commonly called 'inter-operability'. Set up in 2002, the Association brings together all segments of the gas industry: producers, transporters, distributors, traders and shippers, suppliers, consumers and service providers. This workshop presents the latest status on issues such as barriers to gas trade in Europe, rules and procedures under preparation by EASEE-gas, and the implementation schedule of these rules by operators. This article gathers 5 presentations about this topic given at the gas conference

  3. Hydropower Reservoir Operation using Standard Operating and Standard Hedging Policies

    OpenAIRE

    T.R. Neelakantan; K. Sasireka

    2013-01-01

    Standard operating policy and hedging policies are commonly used for reservoir operation for municipal or irrigation water supply. Application of these policies to hydropower reservoir operation is complex. In this paper, new standard operating policies and standard hedging policy are proposed for hydropower reservoir operation. The newly proposed policies were applied to the operation of Indira Sagar reservoir in India and demonstrated.

  4. Operating experience feedback

    International Nuclear Information System (INIS)

    Slovenian Nuclear Safety Administration (SNSA) has developed its own system for tracking, screening and evaluating the operating experiences of the nuclear installations. The SNSA staff regularly tracks the operating experiences throughout the world and screens them on the bases of applicability for the Slovenian nuclear facilities. The operating experiences, which pass the screening, are thoroughly evaluated and also recent operational events in these facilities are taken into account. If needed, more information is gathered to evaluate the conditions of the Slovenian facilities and appropriate corrective actions are considered. The result might be the identification of the need for modification at the licensee, the need for modification of internal procedures in the SNSA or even the proposal for the modification of regulations. Information system helps everybody to track the process of evaluation and proper logging of activities. (author)

  5. Operator Algebras of Functions

    CERN Document Server

    Mittal, Meghna

    2009-01-01

    We present some general theorems about operator algebras that are algebras of functions on sets, including theories of local algebras, residually finite dimensional operator algebras and algebras that can be represented as the scalar multipliers of a vector-valued reproducing kernel Hilbert space. We use these to further develop a quantized function theory for various domains that extends and unifies Agler's theory of commuting contractions and the Arveson-Drury-Popescu theory of commuting row contractions. We obtain analogous factorization theorems, prove that the algebras that we obtain are dual operator algebras and show that for many domains, supremums over all commuting tuples of operators satisfying certain inequalities are obtained over all commuting tuples of matrices.

  6. Nuclear material operations manual

    Energy Technology Data Exchange (ETDEWEB)

    Tyler, R.P.

    1981-02-01

    This manual provides a concise and comprehensive documentation of the operating procedures currently practiced at Sandia National Laboratories with regard to the management, control, and accountability of nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations-management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of playscripts in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion.

  7. LCOGT Network Observatory Operations

    CERN Document Server

    Pickles, Andrew; Boroson, Todd; Burleson, Ben; Conway, Patrick; de Vera, Jon; Elphick, Mark; Haworth, Brian; Rosing, Wayne; Saunders, Eric; Thomas, Doug; White, Gary; Willis, Mark; Walker, Zach

    2014-01-01

    We describe the operational capabilities of the Las Cumbres Observatory Global Telescope Network. We summarize our hardware and software for maintaining and monitoring network health. We focus on methodologies to utilize the automated system to monitor availability of sites, instruments and telescopes, to monitor performance, permit automatic recovery, and provide automatic error reporting. The same jTCS control system is used on telescopes of apertures 0.4m, 0.8m, 1m and 2m, and for multiple instruments on each. We describe our network operational model, including workloads, and illustrate our current tools, and operational performance indicators, including telemetry and metrics reporting from on-site reductions. The system was conceived and designed to establish effective, reliable autonomous operations, with automatic monitoring and recovery - minimizing human intervention while maintaining quality. We illustrate how far we have been able to achieve that.

  8. Licensed operating reactors

    International Nuclear Information System (INIS)

    THE OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  9. Licensed operating reactors

    International Nuclear Information System (INIS)

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar 1990) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  10. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  11. Selecting reactor operator trainees

    International Nuclear Information System (INIS)

    Reactor operator trainee selection tends to be more effective if tailored to a utility's unique needs, and offers the organization a better chance for compliance with Federal regulations than if selection methods are adopted without benefit of local research. The costs of operator training range from $50,000 to $100,000. The test validity relative to a variety of training grades and performance measures is reviewed. Of interest is the degree to which tests differentiate reactor operators with respect to simulator training grades and performance in simulator operation; forms of evaluation which have become fairly standard throughout the power industry. The tests administered to each individual were selected because of their presumed relevance to training grades, and the aptitude measures are intended to assess an individual's potential to benefit from training. Tests, availability, form, the abilities they measure, and the time limit are described. (MCW)

  12. Construction Minerals Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes construction minerals operations in the United States. The data represent commodities covered by the Minerals Information Team (MIT) of the...

  13. Crushed Stone Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes crushed stone operations in the United States. These data were obtained from information reported voluntarily to the USGS by the aggregate...

  14. Sand and Gravel Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes sand and gravel operations in the United States. These data were obtained from information reported voluntarily to the USGS by the aggregate...

  15. Nuclear material operations manuals

    International Nuclear Information System (INIS)

    This manual is intended to provide a concise and comprehensive documentation of the operating procedures currently practiced at Sandia Laboratories with regard to the management, control, and accountability of radioactive and nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations-management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of playscripts in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion

  16. Adaptively Compressed Exchange Operator

    CERN Document Server

    Lin, Lin

    2016-01-01

    The Fock exchange operator plays a central role in modern quantum chemistry. The large computational cost associated with the Fock exchange operator hinders Hartree-Fock calculations and Kohn-Sham density functional theory calculations with hybrid exchange-correlation functionals, even for systems consisting of hundreds of atoms. We develop the adaptively compressed exchange operator (ACE) formulation, which greatly reduces the computational cost associated with the Fock exchange operator without loss of accuracy. The ACE formulation does not depend on the size of the band gap, and thus can be applied to insulating, semiconducting as well as metallic systems. In an iterative framework for solving Hartree-Fock-like systems, the ACE formulation only requires moderate modification of the code, and can be potentially beneficial for all electronic structure software packages involving exchange calculations. Numerical results indicate that the ACE formulation can become advantageous even for small systems with tens...

  17. Dragline operator performance indicator

    Energy Technology Data Exchange (ETDEWEB)

    Dragan Komljenovic; Dragan Bogunovic; Vladislav Kecojevic [University of Quebec, PQ (Canada)

    2010-03-15

    The purpose of this research was to establish an operator performance indicator (OPI) that can be used by mining professionals/management to aid in the evaluation of dragline operators in surface coal mining. The OPI is defined as a ratio of hourly dragline production and hourly energy consumption, which needs to be maximised. A statistical approach based on confidence intervals is proposed as a means of classifying operators' performance. The results of an experiment conducted at a surface mine that is operated by one of the largest North American coal companies are discussed to demonstrate the practical application of developed method. The method applied in this article can also be adjusted and used for various mining equipment.

  18. Licensed operating reactors

    International Nuclear Information System (INIS)

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  19. Nuclear material operations manual

    International Nuclear Information System (INIS)

    This manual provides a concise and comprehensive documentation of the operating procedures currently practiced at Sandia National Laboratories with regard to the management, control, and accountability of nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations-management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of playscripts in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion

  20. Cesarean Section: The Operation

    Medline Plus

    Full Text Available ... The operation Description | Related videos | Most played video E-mail to a friend Please fill in all fields. Please enter a valid e-mail address. Your information: Your recipient's information: Your ...

  1. Cesarean Section: The Operation

    Medline Plus

    Full Text Available ... Your e-mail was sent. Save to my dashboard Sign in or Sign up to save this ... saved this page It's been added to your dashboard . Cesarean section: The operation 3:12 Dr. Siobhan ...

  2. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  3. Cesarean Section: The Operation

    Medline Plus

    Full Text Available ... for your baby Feeding your baby Common illnesses New parents Family health & safety Complications & Loss Pregnancy complications ... operation 3:12 Dr. Siobhan Dolan talks with new moms and moms-to-be about what goes ...

  4. Payroll Operational Data Store

    Data.gov (United States)

    Social Security Administration — The Payroll ODS will provide a single repository of payroll data to produce accurate and timely financial reports to support operating, budget, and policy decisions.

  5. MITS machine operations

    International Nuclear Information System (INIS)

    This document contains procedures which apply to operations performed on individual P-1c machines in the Machine Interface Test System (MITS) at AiResearch Manufacturing Company's Torrance, California Facility

  6. Quality in drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, E.; Gervais, I. [Sedco Forex Jacintoport Facility, Channelview, TX (United States); Le Moign, Y.; Pangarkar, S.; Stibbs, B. [Sedco Forex, Montrouge (France); McMorran, P. [Sedco Forex, Pau (France); Nordquist, E. [Dubai Petroleum Company, Dubai (United Arab Emirates); Pittman, T. [Sedco Forex, Perth (Australia); Schindler, H. [Sedco Forex, Dubai (United Arab Emirates); Scott, P. [Woodside Offshore Petroleum Pty. Ltd., Perth (Australia)

    1996-12-31

    Driven by cost and profitability pressures, quality has taken on new meaning and importance in the oil field during the past decade. In drilling operations, new initiatives have led to cooperative team efforts between operators and drilling contractors to enhance quality. In this article examples are given of how one drilling contractor, by adopting a quality culture, is reaping major benefits for its clients as well as its employees. 22 figs., 19 refs.

  7. Ranking Operations Management Conferences

    OpenAIRE

    Steenhuis, Harm-Jan; Bruijn, de, P.J.A.; Gupta, Sushil; Laptaned, U.

    2007-01-01

    Several publications have appeared in the field of Operations Management which rank Operations Management related journals. Several ranking systems exist for journals based on , for example, perceived relevance and quality, citation, and author affiliation. Many academics also publish at conferences but we have not come across publications that rank conferences. Conference rankings are generally more complicated than journal rankings. Journal rankings are primarily for publishing purposes. Co...

  8. Operating System Process Schedulers

    OpenAIRE

    ŠEKORANJA, MATEJ

    2016-01-01

    Process scheduling is one of the key tasks of every operating system. Proper implementation of a scheduler reflects itself in a system responsiveness, especially when processes require execution in real-time. Multimedia playback is one of these processes, also being one of the most common operating system tasks nowadays. In the beginning of this thesis, I present theoretical basics of scheduling: its goals, different scheduling types and basics algorithms. I cover scheduling in single-proces...

  9. Operation Everest II

    OpenAIRE

    Wagner, Peter D.

    2010-01-01

    Wagner, Peter D. Operation Everest II. High Alt. Med. Biol. 11:111–119, 2010.—In October 1985, 25 years ago, 8 subjects and 27 investigators met at the United States Army Research Institute for Environmental Medicine (USARIEM) altitude chambers in Natick, Massachusetts, to study human responses to a simulated 40-day ascent of Mt. Everest, termed Operation Everest II (OE II). Led by Charlie Houston, John Sutton, and Allen Cymerman, these investigators conducted a large number of investigations...

  10. Second order symmetry operators

    International Nuclear Information System (INIS)

    Using systematic calculations in spinor language, we obtain simple descriptions of the second order symmetry operators for the conformal wave equation, the Dirac–Weyl equation and the Maxwell equation on a curved four-dimensional Lorentzian manifold. The conditions for existence of symmetry operators for the different equations are seen to be related. Computer algebra tools have been developed and used to systematically reduce the equations to a form which allows geometrical interpretation. (paper)

  11. CANDU operating experience

    International Nuclear Information System (INIS)

    The CANDU (CANada Deuterium Uranium) Pressurized Heavy Water (PHW) type of nuclear-electric generating station was developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This paper summarizes Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components, and nuclear safety considerations to both the workers and the public

  12. Operating system Google Android

    OpenAIRE

    Haris, Marek

    2011-01-01

    This Bachelor thesis deals with the Operating system Google Android. In the introductory part the author describes the very history and a progressive development of the company Google and Android. The thesis focuses on the Operating system Google Android and contains some basic information about the system. The architecture is analysed in detail. Then the Bachelor thesis deals with the development of individual version of the system Android. Next chapters explain and deal with the topics And...

  13. Sequences of commutator operations

    CERN Document Server

    Aichinger, Erhard

    2012-01-01

    Given the congruence lattice L of a finite algebra A with a Mal'cev term, we look for those sequences of operations on L that are sequences of higher commutator operations of expansions of A. The properties of higher commutators proved so far delimit the number of such sequences: the number is always at most countably infinite; if it is infinite, then L is the union of two proper subintervals with nonempty intersection.

  14. Treasury operations management

    OpenAIRE

    Laurențiu Dumitru ANDREI; Petre BREZEANU

    2014-01-01

    Amid the globalization and centralization of treasury operations, establishing the principles for their optimal management is the instrument by means of which economic stability, market dynamics and standards of living can be ensured. The directions of these principles, as well as their flexibility, depend on correctly identifying the objectives of the financial management planning of treasury operations, in compliance with European and international policies related to this area.

  15. Operations Acceptance Management

    OpenAIRE

    Suchá, Ivana

    2010-01-01

    This paper examines the process of Operations Acceptance Management, whose main task is to control Operations Acceptance Tests (OAT). In the first part the author focuses on the theoretical ground for the problem in the context of ITSM best practices framework ITIL. Benefits, process pitfalls and possibilities for automation are discussed in this part. The second part contains a case study of DHL IT Services (Prague), where a solution optimizing the overall workflow was implemented using simp...

  16. Operational Waste Volume Projection

    International Nuclear Information System (INIS)

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement

  17. Computer network operations methodology

    OpenAIRE

    Vega, Juan Carlos

    2004-01-01

    Approved for public release; distribution is unlimited All nations face increasing tension between exploiting Computer Network Operations (CNO) in the military sphere and protecting the global information grid. The United States is moving apace to develop doctrines and capabilities that will allow them to exploit cyberspace for military advantage. Within the broad rubric of Information Operations, there is increasing effort devoted to integrating CNO into routine military planning. At the ...

  18. Operational Risk Modeling

    OpenAIRE

    Gabriela ANGHELACHE; Ana Cornelia OLTEANU

    2011-01-01

    Losses resulting from operational risk events from a complex interaction between organizational factors, personal and market participants that do not fit a simple classification scheme. Taking into account past losses (ex. Barings, Daiwa, etc.) we can say that operational risk is a major financial losses in the banking sector, although until recently have been underestimated, considering that they are generally minor, note setting survival of a bank.

  19. Optimization and assistance operations

    International Nuclear Information System (INIS)

    The purpose of this article is to answer this question: what does optimization mean in the frame of an assistance operation. Two points have been developed: the first one is devoted to a broad training and sensitizing for the persons susceptible to participate to these interventions, the second one is the preparation of operations: it is possible to develop optimization from information feedback. (N.C.)

  20. Operational Risk Modeling

    Directory of Open Access Journals (Sweden)

    Gabriela ANGHELACHE

    2011-06-01

    Full Text Available Losses resulting from operational risk events from a complex interaction between organizational factors, personal and market participants that do not fit a simple classification scheme. Taking into account past losses (ex. Barings, Daiwa, etc. we can say that operational risk is a major financial losses in the banking sector, although until recently have been underestimated, considering that they are generally minor, note setting survival of a bank.

  1. Operating System Levels

    OpenAIRE

    2003-01-01

    Operating System Levels This interactive tutorial presents the levels of functions within complex software systems, and the operations of the various levels: shell, directory manager, file manager, display driver, keyboard, disk driver, etc.The information is presented in three different modes. The student may choose to see an animated presentation, view a step-by-step self-paced presentation with explanations provided, or complete a do-it-yourself exercise. Last modified: 5/18/2009 CS...

  2. Operational Waste Volume Projection

    International Nuclear Information System (INIS)

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000

  3. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  4. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  5. Thermal Operating Modes

    International Nuclear Information System (INIS)

    Higher and lower temperature operating modes (e.g., above and below the boiling point of water) are alternative approaches to managing the heat produced by the radioactive decay of spent nuclear fuel. Current analyses indicate that a repository at the Yucca Mountain site is likely to comply with applicable safety standards regardless of the particular thermal operating mode. Both modes have potential advantages and disadvantages. With a higher temperature operating mode (HTOM), waste packages (WPs) can be placed closer together. This reduces the number of drifts, the required emplacement area, construction costs, and occupational risks to construction workers. In addition, the HTOM would minimize the amount of water that might contact the waste for hundreds of years after closure. On the other hand, higher temperatures introduce uncertainties in the understanding of the long-term performance of the repository because of uncertainties in the thermal effects on WP lifetime and the near-field environment around the drifts. A lower temperature operating mode (LTOM) has the potential to reduce uncertainties in long-term performance of the repository by limiting the effects of temperature on WP lifetime and on the near-field environment around the drifts. Depending on the combination of operating parameters, a LTOM could require construction of additional drifts, a larger emplacement area, increased construction costs, increased occupational risks to construction works, and a longer period of ventilation than a HTOM. The repository design for the potential Yucca Mountain site is flexible and can be constructed and operated in various operating modes to achieve specific technical objectives, accommodate future policy decisions, and use of new information. For example, the flexible design can be operated across a range of temperatures and can be tailored to achieve specific thermal requirements in the future. To accommodate future policy decisions, the repository can be

  6. Safe operating envelope

    International Nuclear Information System (INIS)

    This is a slide-based oral presentation given to the COG/IAEA: Fifth technical committee meeting on 'Exchange of operating experience of pressurized heavy water reactors' held in Mangalia, Romania on 7-10 September 1998. The plant states and operating conditions are defined as resulting from the consequences of a Licensing Basis Event occurrence. Three categories of important plant parameters are considered: A - directly associated with either the mechanical or instrumentation and control aspects of the Special Safety Systems; B - process conditions related to trip parameters; C - other parameters that effect outcome of an accident. In A category the following aspects were addressed: Instrument loop uncertainties and time lags and delays; Tank levels, pressures and chemistry; Valve operating times and characteristics; Pump performance; The number of redundant pieces of equipment. Relating to category B the process conditions implied in trip initiation parameters as they effect margin to trip are discussed and illustrated by the cases of pressurizer level, RB pressure, etc. Finally, in the last category, the parameters effecting accident outcome are considered, i.e. either process variables, or equipment associated with safety related or safety support systems. The following cases are analysed PHTS Isotopic/temperatures/flows, moderator outlet temperature, RCW/RSW temperature, number of available aux. boiler feedpumps. In connection with the plant states the following matters are analyzed: fueling; boiler tube leak; defect fuel; non-equilibrium core; shutdown and reduced power operation; two pump operation. Concerning the Safety Operating Envelope (SOE) the following issues are presented: OP and P (high level overview), supported by OM tests and surveillance, by taking into account the use Tech Specs for the future, the role of safety analysis, historical perspective at PLGS. Finally, the DOA (Design/Operation/Analysis) Program at PLGS is described and the following

  7. Operational Dynamic Configuration Analysis

    Science.gov (United States)

    Lai, Chok Fung; Zelinski, Shannon

    2010-01-01

    Sectors may combine or split within areas of specialization in response to changing traffic patterns. This method of managing capacity and controller workload could be made more flexible by dynamically modifying sector boundaries. Much work has been done on methods for dynamically creating new sector boundaries [1-5]. Many assessments of dynamic configuration methods assume the current day baseline configuration remains fixed [6-7]. A challenging question is how to select a dynamic configuration baseline to assess potential benefits of proposed dynamic configuration concepts. Bloem used operational sector reconfigurations as a baseline [8]. The main difficulty is that operational reconfiguration data is noisy. Reconfigurations often occur frequently to accommodate staff training or breaks, or to complete a more complicated reconfiguration through a rapid sequence of simpler reconfigurations. Gupta quantified a few aspects of airspace boundary changes from this data [9]. Most of these metrics are unique to sector combining operations and not applicable to more flexible dynamic configuration concepts. To better understand what sort of reconfigurations are acceptable or beneficial, more configuration change metrics should be developed and their distribution in current practice should be computed. This paper proposes a method to select a simple sequence of configurations among operational configurations to serve as a dynamic configuration baseline for future dynamic configuration concept assessments. New configuration change metrics are applied to the operational data to establish current day thresholds for these metrics. These thresholds are then corroborated, refined, or dismissed based on airspace practitioner feedback. The dynamic configuration baseline selection method uses a k-means clustering algorithm to select the sequence of configurations and trigger times from a given day of operational sector combination data. The clustering algorithm selects a simplified

  8. Licensed operating reactors

    International Nuclear Information System (INIS)

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  9. Aging and operation results

    International Nuclear Information System (INIS)

    The correlation between the different accelerated aging methods and operation reality has to be done with solid and representative elements in matter of tests as well as in operating experience. In 1990 in France, the first unit will be 13 years operating, there will be 34 units of 900 MW PWR and 18 units of 1300 MW PWR in operation. The total of experience will be equivalent to 400 reactor-years. Only computerised means permit to collect all corresponding events, to manage them and to draw a lot of conclusions. One describes these computerised applications explaining the different events collected, data input and interrogating possibilities. The first application, called ''events file'', records all important events in nuclear plants. For each of these events, an event reporting format is set up as soon as first informations are known and then is put into the file. An updating is performed when the event is better known and analyzed. Interrogating programs allow no specialist to access easily to this data bank. So it is possible to collect events of the same nature, of the same equipments or of the same systems. The second application called S.R.D.F. (fiability data bank system) collects all maintenance operations on certain mechanical and electrical equipment. These two computerized applications complete on another in the way they allow to do fiability and availability studies for some equipments or for some elements of a nuclear plant

  10. ITER-FEAT operation

    International Nuclear Information System (INIS)

    ITER is planned to be the first fusion experimental reactor in the world operating for research in physics and engineering. The first 10 years' operation will be devoted primarily to physics issues at low neutron fluence and the following 10 years' operation to engineering testing at higher fluence. ITER can accommodate various plasma configurations and plasma operation modes such as inductive high Q modes, long pulse hybrid modes, non-inductive steady-state modes, with large ranges of plasma current, density, beta and fusion power, and with various heating and current drive methods. This flexibility will provide an advantage for coping with uncertainties in the physics database, in studying burning plasmas, in introducing advanced features and in optimizing the plasma performance for the different programme objectives. Remote sites will be able to participate in the ITER experiment. This concept will provide an advantage not only in operating ITER for 24 hours per day but also in involving the world-wide fusion communities and in promoting scientific competition among the Parties. (author)

  11. Operational cost drivers

    Science.gov (United States)

    Scholz, Arthur L.; Dickinson, William J.

    1988-01-01

    To be economically viable, the operations cost of launch vehicles must be reduced by an order of magnitude as compared to the Space Transportation System (STS). A summary of propulsion-related operations cost drivers derived from a two-year study of Shuttle ground operations is presented. Examples are given of the inordinate time and cost of launch operations caused by propulsion systems designs that did not adequately consider impacts on prelaunching processing. Typical of these cost drivers are those caused by central hydraulic systems, storable propellants, gimballed engines, multiple propellants, He and N2 systems and purges, hard starts, high maintenance turbopumps, accessibility problems, and most significantly, the use of multiple, nonintegrated RCS, OMS, and main propulsion systems. Recovery and refurbishment of SRBs have resulted in expensive crash and salvage operations. Vehicle system designers are encouraged to be acutely aware of these cost drivers and to incorporate solutions (beginning with the design concepts) to avoid business as usual and costs as usual.

  12. Automated emergency operating procedures

    International Nuclear Information System (INIS)

    This paper describes the development of a training tool for the symptom oriented emergency operating procedures used at the Laguna Verde Nuclear Power Plant. EOPs and operator training are intended to assist the operator for managing accident situations. A prototype expert system based on the EOPs has been developed for operator training. The demonstration expert system was developed using a commercial shell. The knowledge base consists of two parts. The specific operator actions to be executed for 5 selected accident sequences and the EOPs steps for the reactor pressure vessel control of the water level, pressure, and power. The knowledge is expressed in the form of IF-THEN production rules. A typical training session will display a set of conditions and will prompt the trainee to indicate the appropriate step to perform. This mode will guide the trainee through selected accident sequences. A second mode of the expert system will prompt the trainee for the current plant conditions and the expert system will respond with the EOPs which are required to be performed under these conditions. This allows the trainee to study What if situations

  13. Licensed operating reactors

    International Nuclear Information System (INIS)

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units are provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  14. Operations Strategy in practice

    DEFF Research Database (Denmark)

    Rytter, Niels Gorm; Koch, Christian; Boer, Harry

    2005-01-01

    In this paper, we describe and illustrate a new, action-based longitudinal case study approach, which aims at helping scholars narrow the gap between the theory and practice of Operations Strategy (OS). First, we elaborate on the need for new research methods for studying OS in practice. Then, we...... present the two research strategies underpinning the approach proposed here: action research and longitudinal case study. Next, we illustrate the use of the method and exemplify it using a recent study of OS in practice. Then, based on this experience we present and discuss the advantages and...... disadvantages of the method. Finally, we draw conclusions on its potential for operations strategy and operations management studies....

  15. Licensed operating reactors

    International Nuclear Information System (INIS)

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  16. Licensed operating reactors

    International Nuclear Information System (INIS)

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  17. About APPLE II Operation

    International Nuclear Information System (INIS)

    The operation of an APPLE II based undulator beamline with all its polarization states (linear horizontal and vertical, circular and elliptical, and continous variation of the linear vector) requires an effective description allowing an automated calculation of gap and shift parameter as function of energy and operation mode. The extension of the linear polarization range from 0 to 180 deg. requires 4 shiftable magnet arrrays, permitting use of the APU (adjustable phase undulator) concept. Studies for a pure fixed gap APPLE II for the SLS revealed surprising symmetries between circular and linear polarization modes allowing for simplified operation. A semi-analytical model covering all types of APPLE II and its implementation will be presented

  18. Grout treatment facility operation

    International Nuclear Information System (INIS)

    This paper summarizes the operation of the Grout Treatment Facility from initial testing to the final disposal to date of 3.8 x 103 m3 (1 Mgal) of low-level radioactive waste. It describes actual component testing and verification, testing of the full-scale system with simulated waste feed, summary of the radioactive disposal operation, lessons learned and equipment performance summary, facility impacts from safety analyses, long-term performance assessments, the Part B application, and projected facility modifications. The Grout Treatment Facility is one of two operations for permanently disposing of liquid defense wastes at the Hanford site near Richland, Washington, for the U.S. Department of Energy. High- and low-level radioactive wastes have been accumulating from defense material production since the mid-1940s at the Hanford site. All radioactive low-level and low-level mixed liquid wastes will be disposed of at the future Hanford Vitrification Facility

  19. ORNL radioactive waste operations

    International Nuclear Information System (INIS)

    Since its beginning in 1943, ORNL has generated large amounts of solid, liquid, and gaseous radioactive waste material as a by-product of the basic research and development work carried out at the laboratory. The waste system at ORNL has been continually modified and updated to keep pace with the changing release requirements for radioactive wastes. Major upgrading projects are currently in progress. The operating record of ORNL waste operation has been excellent over many years. Recent surveillance of radioactivity in the Oak Ridge environs indicates that atmospheric concentrations of radioactivity were not significantly different from other areas in East Tennesseee. Concentrations of radioactivity in the Clinch River and in fish collected from the river were less than 4% of the permissible concentration and intake guides for individuals in the offsite environment. While some radioactivity was released to the environment from plant operations, the concentrations in all of the media sampled were well below established standards

  20. Operations Strategy in practice

    DEFF Research Database (Denmark)

    Rytter, Niels Gorm; Koch, Christian; Boer, Harry

    2005-01-01

    In this paper, we describe and illustrate a new, action-based longitudinal case study approach, which aims at helping scholars narrow the gap between the theory and practice of Operations Strategy (OS). First, we elaborate on the need for new research methods for studying OS in practice. Then, we...... present the two research strategies underpinning the approach proposed here: action research and longitudinal case study. Next, we illustrate the use of the method and exemplify it using a recent study of OS in practice. Then, based on this experience we present and discuss the advantages...... and disadvantages of the method. Finally, we draw conclusions on its potential for operations strategy and operations management studies....

  1. Licensed operating reactors

    International Nuclear Information System (INIS)

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  2. About APPLE II Operation

    Science.gov (United States)

    Schmidt, T.; Zimoch, D.

    2007-01-01

    The operation of an APPLE II based undulator beamline with all its polarization states (linear horizontal and vertical, circular and elliptical, and continous variation of the linear vector) requires an effective description allowing an automated calculation of gap and shift parameter as function of energy and operation mode. The extension of the linear polarization range from 0 to 180° requires 4 shiftable magnet arrrays, permitting use of the APU (adjustable phase undulator) concept. Studies for a pure fixed gap APPLE II for the SLS revealed surprising symmetries between circular and linear polarization modes allowing for simplified operation. A semi-analytical model covering all types of APPLE II and its implementation will be presented.

  3. Injector operations at LAMPF

    International Nuclear Information System (INIS)

    The injector complex at LAMPF consists of three on-line 750-kV injectors which provide simultaneous H+ and H- beams for LAMPF production and an off-line 200-keV injector for ion source and beam diagnostic development studies. The present operation now entails a 500-μA/sub a/ H+ beam accelerated simultaneously with either a 6-μA/sub a/ unpolarized or 10-nA/sub a/ polarized H- beam. In order to obtain the low-beam spill required for the operation of the LAMPF accelerator, it has been necessary to increase the brightness of the high-intensity H+ beam. The operating experience and development work that has been carried out on all of these injectors to improve the quality and intensity of these beams will be presented. The details of the construction of the test stand injector and the development program planned for this injector will also be outlined

  4. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  5. SSCL Commissioning and Operations

    International Nuclear Information System (INIS)

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  6. Operating US power reactors

    International Nuclear Information System (INIS)

    This update, which appears regularly in each issue of Nuclear Safety, surveys the operations of those power reactors in the US which have been issued operating licenses. Table 1 shows the number of such reactors and their net capacities as of Dec. 31, 1986, the end of the three-month period covered in this report. Table 2 lists the unit capacity and forced outage rate for each licensed reactor for each of the three months (October, November, and December 1986) covered in this report and the cumulative values of these parameters since the beginning of commercial operation. They are defined as follows: In addition to the tabular data, this article discusses significant occurrences and developments that affected licensed US power reactors during this reporting period. It includes, but is not limited to, changes in operating status, regulatory actions and decisions, and legal actions involving the status of power reactors. We do not have space here for routine problems of operation and maintenance, but such information is available at the Nuclear Regulatory Commission (NRC) Public Document Room, 1717 H Street, NW, Washington, DC 20555. Some significant operating events are summarized elsewhere in this section in the article ''Selected Safety-Related Events,'' and a report on activities relating to facilities still in the construction process is given in the article ''Status of Power-Reactor Projects Undergoing Licensing Review'' in the last section of each issue of this journal. The reader's attention is also called to the regular feature ''General Administrative Activities,'' which deals with more general aspects of regulatory and legal matters that are not covered elsewhere in the journal

  7. International co-operation

    International Nuclear Information System (INIS)

    In 1996, Nuclear Regulatory Authority of the Slovak Republic (NRA SR) ensured the Slovak Republic (SR) obligations with relation to the international agreements and with the SR membership in the IAEA.International co-operation has been ensured on the basis of the bilateral international agreements. With the Ministry of Foreign Affairs co-operation, the SR fulfilled its financial obligations to this organization in due time and in the full scope. Representing Central and Eastern Europe interest in the Board of Governors, the SR participation in the highest executive in the highest executive authority was finished in 1996.The Board of Governors Vice-chairman position was executed by NRA SR Chairman. 5 national and 6 regional technical co-operation and assistance projects were realized in 1996. 12 organizations participated in these projects and accordingly 104 experts took part in training programmes, scientific visits or as the mission members abroad. Besides, Slovak experts participated at work of technical advisory and consultation groups with the significant assistance. In the framework of IAEA co-operation, the SR was visited by 11 expert missions formed by 28 experts from 19 countries including IAEA. Slovak organizations, namely institutes of the Academy of Sciences, Slovak research centres and universities participated in IAEA scientific and research activities through NRA SR. 15 scientific contracts in total were approved and realized and these contracts are utilized as supplementary financing of the own scientific and research projects. Other international co-operation and regional co-operation activities of the NRA SR in 1996 are reviewed

  8. GNF2 Operating Experience

    International Nuclear Information System (INIS)

    GNF's latest generation fuel product, GNF2, is designed to deliver improved nuclear efficiency, higher bundle and cycle energy capability, and more operational flexibility. But along with high performance, our customers face a growing need for absolute fuel reliability. This is driven by a general sense in the industry that LWR fuel reliability has plateaued. Too many plants are operating with fuel leakers, and the impact on plant operations and operator focus is unacceptable. The industry has responded by implementing an INPO-coordinated program aimed at achieving leaker-free reliability by 2010. One focus area of the program is the relationship between fuel performance (i.e., duty) and reliability. The industry recognizes that the right balance between performance and problem-free fuel reliability is critical. In the development of GNF2, GNF understood the requirement for a balanced solution and utilized a product development and introduction strategy that specifically addressed reliability: evolutionary design features supported by an extensive experience base; thoroughly tested components; and defense-in-depth mitigation of all identified failure mechanisms. The final proof test that the balance has been achieved is the application of the design, initially through lead use assemblies (LUAs), in a variety of plants that reflect the diversity of the BWR fleet. Regular detailed surveillance of these bundles provides the verification that the proper balance between performance and reliability has been achieved. GNF currently has GNF2 lead use assemblies operating in five plants. Included are plants that have implemented extended power up-rates, plants on one and two-year operating cycles, and plants with and without NobleChemTM and zinc injection. The leading plant has undergone three pool-side inspections outages to date. This paper reviews the actions taken to insure GNF2's reliability, and the lead use assembly surveillance data accumulated to date to validate

  9. A VIRTUAL OPERATING SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Hall, Dennis E.; Scherrer, Deborah K.; Sventek, Joseph S.

    1980-05-01

    Significant progress toward disentangling computing environments from their under lying operating systern has been made. An approach is presented that achieves inter-system uniformity at all three levels of user interface - virtual machine, utilities, and command language. Under specifiable conditions, complete uniformity is achievable without disturbing the underlying operating system. The approach permits accurate computation of the cost to move both people and software to a new system. The cost of moving people is zero, and the cost of moving software is equal to the cost of implementing a virtual machine. Efficiency is achieved through optimization of the primitive functions.

  10. Operating Sulfiban desulfurization equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kato, T.; Sekikawa, N.; Matsumura, S.; Tawara, T.

    1982-01-01

    A report on the equipment referred to in the title, which has been operating smoothly during the two years since its construction at the Keihin Iron Works. The flowsheet of the Sulfiban process is outlined, with explanations of the design conditions, equipment characteristics, and operational record. Coke oven gas is brought into contact with a 15% solution of monoethanolamine in the desulfurization tower and the contained H/sub 2/S, HCN and some of the CO/sub 2/ is removed by absorption. The equipment maintains a high desulfurization percentage of over 97%. Corrosion control of the equipment is touched upon.

  11. Alkaline battery operational methodology

    Energy Technology Data Exchange (ETDEWEB)

    Sholklapper, Tal; Gallaway, Joshua; Steingart, Daniel; Ingale, Nilesh; Nyce, Michael

    2016-08-16

    Methods of using specific operational charge and discharge parameters to extend the life of alkaline batteries are disclosed. The methods can be used with any commercial primary or secondary alkaline battery, as well as with newer alkaline battery designs, including batteries with flowing electrolyte. The methods include cycling batteries within a narrow operating voltage window, with minimum and maximum cut-off voltages that are set based on battery characteristics and environmental conditions. The narrow voltage window decreases available capacity but allows the batteries to be cycled for hundreds or thousands of times.

  12. TRIGA reactor operating experience

    International Nuclear Information System (INIS)

    The Oregon State TRIGA Reactor (OSTR) has been in operation 3 years. Last August it was upgraded from 250 kW to 1000 kW. This was accomplished with little difficulty. During the 3 years of operation no major problems have been experienced. Most of the problems have been minor in nature and easily corrected. They came from lazy susan (dry bearing), Westronics Recorder (dead spots in the range), The Reg Rod Magnet Lead-in Circuit (a new type lead-in wire that does not require the lead-in cord to coil during rod withdrawal hss been delivered, much better than the original) and other small corrections

  13. Operative management of appendicitis.

    Science.gov (United States)

    St Peter, Shawn D; Snyder, Charles L

    2016-08-01

    Appendectomy has been the standard of care for appendicitis since the late 1800s, and remains one of the most common operations performed in children. The advent of data-driven medicine has led to questions about every aspect of the operation-whether appendectomy is even necessary, when it should be performed (timing), how the procedure is done (laparoscopic variants versus open and irrigation versus no irrigation), length of hospital stay, and antibiotic duration. The goal of this analysis is to review the current status of, and available data regarding, the surgical management of appendicitis in children. PMID:27521710

  14. Cohomological vertex operators

    CERN Document Server

    Viña, Andrés

    2016-01-01

    Given a Calabi-Yau manifold and considering the $B$-branes on it as objects in the derived category of coherent sheaves, we identify the vertex operators for strings between two branes with elements of the cohomology groups of Ext sheaves. We define the correlation functions for these general vertex operators. Strings stretching between two coherent sheaves are studied as homological extensions of the corresponding branes. In this context, we relate strings between different pairs of branes when there are maps between these branes. We also interpret some strings with ghost number $k$ as obstructions for lifts or extensions of strings with ghost number $k-1$.

  15. RHIC OPERATIONAL STATUS.

    Energy Technology Data Exchange (ETDEWEB)

    ROSER, T.

    2005-05-16

    As the first hadron accelerator and collider consisting of two independent superconducting rings RHIC has operated with a wide range of beam energies and particle species. Machine operation and performance will be reviewed that includes high luminosity gold-on-gold and copper-on-copper collisions at design beam energy (100 GeV/u), asymmetric deuteron-on-gold collisions as well as high energy polarized proton-proton collisions (100 GeV on 100 GeV). Plans for future upgrades of RHIC will also be discussed.

  16. Operating mine fans

    Energy Technology Data Exchange (ETDEWEB)

    Kovalevskaya, V.I.; Fal' kov, B.S.; Spivak, V.A.

    1983-01-01

    Operation and repair of fans of main ventilation are described. Data are presented on periodicity and order of servicing, organization of repairs. Repair variants of the least reliable assemblies are indicated. Methods are presented for improving pressure and productivity of the fans, guarantee of the most economic mode of their operation in order to improve reliability and decrease consumption of electricity, methods of aerodynamic and strength tests. Signs are defined, reasons and orders for detecting malfunctions in the parts of assemblies and mechanical equipment, plans of control and automation of electric drive.

  17. Intelligence operator support system

    International Nuclear Information System (INIS)

    The paper describes a system which is capable of discerning an onset of abnormal situations arising in the course of the NPP operation and providing recommendations to the operator in his control actions. The system represents a set of interrelated algorithm with two models. One is intended for automatic diagnostics of the functioning of the on-board ''Topaz-2'' type SNPP. The other can be used as a part of the automatic control system of the technological processes in the NPP. The software is intended for the implementation in the IBM-PC/AT compatible computers. (author). 3 figs

  18. Bascoms operation for pilonidalcyste

    DEFF Research Database (Denmark)

    Bertelsen, C.A.; Jørgensen, Lars Nannestad

    2008-01-01

    -up of 19 (8-29) months. 39 (93%) patients did not experience recurrence while the 3 cases of recurrence were observed after 5, 8 and 9 months. CONCLUSION: Bascom's operation seems to reduce postoperative pain, complications, and the risk of recurrence compared with simple excision with or without......INTRODUCTION: Treatment of pilonidal fistula often results in impaired wound healing and recurrence. After wide excision of the fistula, impaired healing and recurrence occur in up to 69% and 10-29% of cases, respectively. Based on these facts we decided to implement Bascom's cleft-lift operation...

  19. Momentum operators on graphs

    CERN Document Server

    Exner, Pavel

    2012-01-01

    We discuss ways in which momentum operators can be introduced on an oriented metric graph. A necessary condition appears to the balanced property, or a matching between the numbers of incoming and outgoing edges; we show that a graph without an orientation, locally finite and at most countably infinite, can made balanced oriented \\emph{iff} the degree of each vertex is even. On such graphs we construct families of momentum operators; we analyze their spectra and associated unitary groups. We also show that the unique continuation principle does not hold here.

  20. The operation and maintenance manual

    International Nuclear Information System (INIS)

    The Operating Manual is one of many technical documents which the nuclear power plant operator needs for ensuring safe operation. For the operating staff, however, there is only one document, namely the Operating Manual. It contains, appropriately arranged, the necessary system and other diagrams, drawings, lists, licensing documents and similar material, which are necessary for understanding the design, for testing, for obtaining the operating licence and for the operation of individual systems and of the entire plant. (orig./RW)

  1. Operations Between Functions

    DEFF Research Database (Denmark)

    Gardner, Richard J.; Kiderlen, Markus

    associative, must be one of 40 explicitly given types. In particular, this is the case for operations between pairs of arbitrary, or continuous, or differentiable functions. The term pointwise means that (f ∗g)(x) = F(f(x), g(x)), for all x ∈ A and some function F of two variables. Several results in the same...

  2. Basic Water Treatment Operation.

    Science.gov (United States)

    Ontario Ministry of the Environment, Toronto.

    This manual was developed for use at workshops designed to introduce the fundamentals of water treatment plant operations. The course consists of lecture-discussions and hands-on activities. Each of the fourteen lessons in this document has clearly stated behavioral objectives to tell the trainee what he should know or do after completing that…

  3. ITS / Commercial Vehicle Operations

    OpenAIRE

    Bhatia, Pratyush

    2003-01-01

    Intelligent Transportation Systems (ITS) utilize information, communication, sensor, and control technologies to achieve improved levels of performance. The U.S. DOT has developed a National ITS Program Plan that includes seven major elements. One of them addresses the ITS technologies which uniquely support Commercial Vehicle Operations (CVO).

  4. Snow-clearing operations

    CERN Multimedia

    EN Department

    2010-01-01

    To facilitate snow clearing operations, which commence at 4.30 in the morning, all drivers of CERN cars are kindly requested to park them together in groups. This will help us greatly assist us in our work. Thank-you for your help. Transport Group / EN-HE Tel. 72202

  5. Heat exchangers: operation problems

    International Nuclear Information System (INIS)

    The main operation problems for heat exchangers are fouling, corrosion, vibrations and mechanical resistance. Fouling and corrosion lead to an over dimensioning, energy consumption increase, corroded pieces change, shutdown costs. Vibrations are taken in account during the dimensioning phase of the heat exchangers. Mechanical resistance problems are, for the classical ones, described in regulation texts. (A.B.). 5 figs., 4 tabs

  6. Camera Operator and Videographer

    Science.gov (United States)

    Moore, Pam

    2007-01-01

    Television, video, and motion picture camera operators produce images that tell a story, inform or entertain an audience, or record an event. They use various cameras to shoot a wide range of material, including television series, news and sporting events, music videos, motion pictures, documentaries, and training sessions. Those who film or…

  7. Dam safety operating guidelines

    International Nuclear Information System (INIS)

    As part of Ontario Hydro's dam structure assessment program, the hydraulic design review of several river systems has revealed that many existing dam sites, under current operating procedures, would not have sufficient discharge capacity to pass the Inflow Design Flood (IDF) without compromising the integrity of the associated structures. Typical mitigative measures usually considered in dealing with these dam sites include structural alterations, emergency action plans and/or special operating procedures designed for extreme floods. A pilot study was carried out for the Madawaska River system in eastern Ontario, which has seven Ontario Hydro dam sites in series, to develop and evaluate the effectiveness of the Dam Safety Operating Guidelines (DSOG). The DSOG consist of two components: the flood routing schedules and the minimum discharge schedules, the former of which would apply in the case of severe spring flood conditions when the maximum observed snowpack water content and the forecast rainfall depth exceed threshold values. The flood routing schedules would identify to the operator the optimal timing and/or extent of utilizing the discharge facilities at each dam site to minimize the potential for dam failures cased by overtopping anywhere in the system. It was found that the DSOG reduced the number of structures overtopped during probable maximum flood from thirteen to four, while the number of structures that could fail would be reduced from seven to two. 8 refs., 4 figs., 3 tabs

  8. Operant Conditioning - Token Economy.

    Science.gov (United States)

    Montgomery, Jacqueline; McBurney, Raymond D.

    Described is an Operant Conditioning-Token Economy Program, teaching patients to be responsible for their own behavior, to make choices, and to be motivated to change. The program was instigated with mentally ill patients in a state hospital and was later used with institutionalized mentally handicapped groups. After two years, only four of the…

  9. Higher homotopy operations

    Czech Academy of Sciences Publication Activity Database

    Blanc, D.; Markl, Martin

    2003-01-01

    Roč. 245, č. 1 (2003), s. 1-29. ISSN 0025-5874 R&D Projects: GA AV ČR IAA1019203 Institutional research plan: CEZ:AV0Z1019905; CEZ:AV0Z1019905 Keywords : higher homotopy operation * W-construction * polyhedron Subject RIV: BA - General Mathematics Impact factor: 0.678, year: 2003

  10. Installing and operating FEGTEMs

    Energy Technology Data Exchange (ETDEWEB)

    Hetherington, C.J.; Cullis, A.G.; Walker, S.; Turner, J.; Nelson, E.C.; O' Keefe, M.A.

    1997-11-03

    In order to operate at full potential, Field-Emission-Gun Transmission Electron Microscopes (FEG-TEMs) require special environments designed to minimize the effects of vibration and electromagnetic noise. This report shows how careful attention to these details can enable such instruments to achieve their design parameters and produce information transfer to sub-Angstrom resolutions.

  11. Concept of Operations: Essence

    Energy Technology Data Exchange (ETDEWEB)

    Hutton, William J.

    2014-04-01

    This concept of operations is designed to give the reader a brief overview of the National Rural Electric Cooperative Association’s Essence project and a description of the Essence device design. The data collected by the device, how the data are used, and how the data are protected are also discussed in this document.

  12. Fast Fuzzy Arithmetic Operations

    Science.gov (United States)

    Hampton, Michael; Kosheleva, Olga

    1997-01-01

    In engineering applications of fuzzy logic, the main goal is not to simulate the way the experts really think, but to come up with a good engineering solution that would (ideally) be better than the expert's control, In such applications, it makes perfect sense to restrict ourselves to simplified approximate expressions for membership functions. If we need to perform arithmetic operations with the resulting fuzzy numbers, then we can use simple and fast algorithms that are known for operations with simple membership functions. In other applications, especially the ones that are related to humanities, simulating experts is one of the main goals. In such applications, we must use membership functions that capture every nuance of the expert's opinion; these functions are therefore complicated, and fuzzy arithmetic operations with the corresponding fuzzy numbers become a computational problem. In this paper, we design a new algorithm for performing such operations. This algorithm is applicable in the case when negative logarithms - log(u(x)) of membership functions u(x) are convex, and reduces computation time from O(n(exp 2))to O(n log(n)) (where n is the number of points x at which we know the membership functions u(x)).

  13. Energy Operations Policy

    International Nuclear Information System (INIS)

    The document sets out the operational role of the Bank in this sector and establishes the overall framework for the Bank's activities. This new Policy replaces and updates the Natural Resources Operations Policy and the Energy Operations Policy approved by the Board of Directors in 1999 and 2000, respectively, combining the two spheres of activity into one comprehensive policy. Specifically, this Policy builds on past policies and complements more closely new regional and global energy initiatives now being implemented by national and international bodies. The Policy particularly mandates the Bank to increase its support for energy efficiency and renewable energy, corporate governance and transparency, and to refine its activities in other areas based on lessons learned and evolving best international practices. The Policy encompasses all activities in energy conversion including: demand side performance, power generation, transmission, distribution and supply, the entire oil and gas cycle from production to transportation, refining, and distribution and coal mining. The Policy will guide the Bank in its direct investment operations and, as expressly provided, in its investments through financial intermediaries

  14. Managing for safe operation

    International Nuclear Information System (INIS)

    A report of the IAEA Seminar on Safety in Nuclear Power Plant Operation held in Vienna in November 1983 is given. The seminar was largely devoted to management with emphasis on motivation and creation of a good working climate, quality assurance and performance. (U.K.)

  15. Operator/contractor relationships

    International Nuclear Information System (INIS)

    In May 1988, Shell Western E and P Inc. (SWEPI) and partners Elf Aquitaine Petroleum and Conoco Inc. signed a letter of intent with Canadian Marine Drilling Ltd. (Canmar) for provision of exploratory drilling and marine services on leases in OCS Lease Sale 109 in the Chukchi Sea, Alaska. The 5450 blocks offered in the remote sale area west of Point Barrow ranged from 3 to 240 miles (5 to 380 km) offshore in water depths from 26 to 263 feet (8 to 80 m). The principal interest tracts were at least 75 miles (120 km) offshore and north of 70 degrees N latitude. The remoteness and total lack of any oilfield infrastructure required considerable planning and coordination between Operator and Contractor in order to carry out the three-year drilling program efficiently and safely in an environmentally harsh and, at the same time, sensitive area. SWEPI and Canmar developed a close working relationship from the start of the project through a number of participative approaches to the problems that had to be solved. This paper reports that these included strong reliance on operational planning meetings, post-season analyses, and an overall emphasis on the teamwork required of both parties to carry out the first-ever drilling program in the Chukchi Sea. This approach led to a very successful operation for both parties and emphasizes the positive benefits achievable when Operator and Contractor work as a team

  16. Kosovo : Operational Procurement Review

    OpenAIRE

    World Bank

    2004-01-01

    This Operational Procurement Report (OPR) provides an assessment of the public-sector procurement system in Kosovo, including that on the legislative framework, the responsibilities and capacity of the institutions entrusted with regulatory and review powers, the efficacy of current procurement practices, and on the environment. The report makes recommendations to bring about legislative, ...

  17. Relativistic kinetic momentum operators

    International Nuclear Information System (INIS)

    In the framework of the quantum theory in the relativistic configuration r-space the kinetic momenta, corresponding to the half of the non-Euclidean distance in the Lobachevsky velocities space, are introduced. These operators, coinciding up to the constant factor with the generators of translations of the r-space, are the exterior derivatives of the noncommutative differential calculus

  18. Anomalies and elliptic operators

    International Nuclear Information System (INIS)

    The coefficients of asymptotic expansion Spexp(-tA) at t→0 are calculated for the quantum field theory operators. It is shown how to apply these results to the calculations of axial and conformal anomalies, the charge renormalization in gauge theory and effective action in twodimensional electrodynamics

  19. Splunk operational intelligence cookbook

    CERN Document Server

    Diakun, Josh; Mock, Derek

    2014-01-01

    This book is intended for users of all levels who are looking to leverage the Splunk Enterprise platform as a valuable operational intelligence tool. The recipes provided in this book will appeal to individuals from all facets of a business - IT, Security, Product, Marketing, and many more!

  20. Cutback for grid operators

    International Nuclear Information System (INIS)

    The Netherlands Competition Authority (NMa), in which the Office of Energy Regulation (DTe) is included plan to decrease the capital cost compensation (or weighted average cost of capital or WACC) for grid operators. In this article it is explained how the compensation is calculated, why this measure will be taken and what the effects of this cutback are

  1. Almost periodic Schroedinger operators

    International Nuclear Information System (INIS)

    These lectures are devoted to recent developments in the theory of almost-periodic Schroedinger Operators. We specially describe the algebraic point of view, with applications to gap-labelling theorems. Particular models are also presented which exhibit various spectral properties. (orig.)

  2. Learning Resources Operational Model.

    Science.gov (United States)

    Tarrant County Junior Coll. District, Ft. Worth, TX.

    The learning resources program at Tarrant Count Junior College calls for a district-wide resource dedicated to the support of instruction. Traditional library and media services are subsumed within this approach. The operational model consists of many interrelated subsystems most of which are described by flow charts. The systems viewpoint is…

  3. Evolution of an operation.

    Science.gov (United States)

    Shumacker, H B

    1981-01-01

    The story of the origin of Matas' endoaneurysmorrhaphy with suggestions for maintaining or restoring arterial continuity and their gradual evolution into the technique of intrasaccular interpolation of grafts in managing aneurysms provides another example of the increased utility of an operative procedure by its modification and expansion. PMID:7217191

  4. Operation for gigantincisionalhernie

    DEFF Research Database (Denmark)

    Eriksson, Axelina; Krag, Christen; Jørgensen, Lars Nannestad;

    2014-01-01

    level evidence. Mesh placement is possible onlay, inlay, sublay or intraperitoneal. These operations are most often performed as open procedures, or in combination with endoscopic techniques. These procedures should be centralized to few centers to improve quality and allow robust research....

  5. Initial operation of PDX

    International Nuclear Information System (INIS)

    Initial operation of PDX with a circular cross-section plasma is described. The machine parameters are given and the glow discharge cleaning is discussed. Plasma parameters for a circular deuterium plasma discharge are given for both moderate and low q experiments

  6. Normal operating controls

    International Nuclear Information System (INIS)

    The criteria, methods and techniques employed by B and W in setting the limits for normal reactor core operation are described. The data used and references cited are consistent with the B-SAR-205. The techniques and types of restrictions are, however, applicable to all B and W cores

  7. Operation C O P

    Science.gov (United States)

    Mueck, Robert P.; Parker, Ashley

    2011-01-01

    Sometimes one never knows what sparks an idea or causes people to come together and take something forward. An example of this is Operation COP at the University of Maryland in College Park. Their version of the "See Something, Say Something" campaign is being touted as a crime prevention program, while it is at the same time an anti-terrorism…

  8. Innovation Teams: Operating Principles.

    Science.gov (United States)

    Thomas, George B.; Jones, James M.

    This examination of the operation of teams in the Pilot Communities Program is chiefly historical in character. Based on intensive examination of proposals, evaluation studies, reports, memoranda, and interviews with personnel involved in the program, it was written by two university professors who had not been involved in the actual program. The…

  9. Operations Policy Manual, 2012

    Science.gov (United States)

    Teacher Education Accreditation Council, 2011

    2011-01-01

    The Teacher Education Accreditation Council's (TEAC's) "Operations Policy Manual" outlines all of TEAC's current policies and procedures related to TEAC members, TEAC administration, and the public, and includes the Bylaws of the Teacher Education Accreditation Council. Contents include: (1) Policies Related to TEAC Members; (2) Policies Related…

  10. Operations Policy Manual, 2010

    Science.gov (United States)

    Teacher Education Accreditation Council, 2010

    2010-01-01

    The Teacher Education Accreditation Council (TEAC) "Operations Policy Manual" outlines all of TEAC's current policies and procedures related to TEAC members, TEAC administration, and the public, and includes the Bylaws of the Teacher Education Accreditation Council, Inc. An index is also included.

  11. Invariant differential operators

    CERN Document Server

    Dobrev, Vladimir K

    2016-01-01

    With applications in quantum field theory, elementary particle physics and general relativity, this two-volume work studies invariance of differential operators under Lie algebras, quantum groups, superalgebras including infinite-dimensional cases, Schrödinger algebras, applications to holography. This first volume covers the general aspects of Lie algebras and group theory.

  12. Intelligent Potroom Operation

    Energy Technology Data Exchange (ETDEWEB)

    Jan Berkow; Larry Banta

    2003-07-29

    The Intelligent Potroom Operation project focuses on maximizing the performance of an aluminum smelter by innovating components for an intelligent manufacturing system. The Intelligent Potroom Advisor (IPA) monitors process data to identify reduction cells exhibiting behaviors that require immediate attention. It then advises operational personnel on those heuristic-based actions to bring the cell back to an optimal operating state in order to reduce the duration and frequency of substandard reduction cell performance referred to as ''Off-Peak Modes'' (OPMs). Techniques developed to identify cells exhibiting OPMs include the use of a finite element model-based cell state estimator for defining the cell's current operating state via advanced cell noise analyses. In addition, rule induction was also employed to identify statistically significant complex behaviors that occur prior to OPMs. The intelligent manufacturing system design, concepts and formalisms developed in this project w ere used as a basis for an intelligent manufacturing system design. Future research will incorporate an adaptive component to automate continuous process improvement, a technology platform with the potential to improve process performance in many of the other Industries of the Future applications as well.

  13. PSA in operator training

    International Nuclear Information System (INIS)

    The systematic approach to training is internationally accepted as the best method to achieve and maintain the qualification and competence of power plant personnel and to guarantee the quality of their training. Following the recommendations and guidelines of international organisations competent in the field, TECNATOM SA has developed projects based on the systematic approach to training for all Spanish nuclear power plants. One of the latest projects was the systematic approach to training developed for the operation personnel of ASCO Nuclear Power Plant. In this case, certain results of the Probabilistic Safety Analysis (PSA) which complement the systematic safety and reliability criteria of the systematic approach to training process have been incorporated in the traditional processes of work and task analysis and training plan design. This incorporation provides the training manager with additional criteria based not only on safety aspects obtained through the statistical treatment of considerations of skilled technical personnel (operators, operation chief supervisors, etc), but also on the independent criterion of the PSA. The inclusion of this approach basically affects all systematics in two of its stages: During the selection process of operating practices in SMR or SGI, the possible scenarios have been associated with all those situations where human actions which lead to an initiating event or human actions to mitigate an initiating event, may take place, as defined in the PSA. During the scenario development process, the instruments involved in the performance of human actions which originate or mitigate an event taking place have been identified. This pakes it possible to reconcile the scenario event sequence with the sequence considered in the PSA study, as the most likely to provoke a more serious accident. The incorporation of these PSA results contributes to the strengthening of safety aspects in training in an objective way, and confirms that

  14. Annual Report on SPR Operation in 2011

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    1 Information of operation Operation person: present chief operators are 11 persons, operators are 6 persons; new chief operators are 3 persons, new operator is 1 person; training chief operators are 3 persons, training operators are 1 persons;

  15. Accessible Information and Quantum operations

    OpenAIRE

    Cai, Qing-yu

    2003-01-01

    The accessible information decreases under quantum operations. We analyzed the connection between quantum operations and accessible information. We show that a general quantum process cannot be operated accurately. Futhermore, an unknown state of a closed quantum system can not be operated arbitrarily by a unitary quantum operation.

  16. Some operations on database universes

    OpenAIRE

    Brock, E.O. de

    1997-01-01

    Operations such as integration or modularization of databases can be considered as operations on database universes. This paper describes some operations on database universes. Formally, a database universe is a special kind of table. It turns out that various operations on tables constitute interesting operations on database universes as well.

  17. Non-operators versus operators - resolving significant disagreements under joint operating agreements: conference papers

    International Nuclear Information System (INIS)

    The conference contains ten papers delivered at the conference in Calgary by personnel working in the legal, regulatory and operational sides of the oil and gas industry with and emphasis on the technical and legal issues arising from the relationship between operators and non-operators in the energy industry. Three articles on the operator's standard of care in wellsite operations, health and safety issues in joint operating agreements and orphan wells in joint operations are indexed separately

  18. White Cliffs: Operating Experience

    Science.gov (United States)

    Kaneff, S.

    1984-01-01

    The fourteen dish white cliffs solar power station area is remote and subject to extreme environmental conditions, solution of the associated problems required careful and thoughtful attention and the application of resources. Notwithstanding the wide range and harshness of conditions, the difficulties caused by remoteness and the lack of a technological base and the need for relatively rapid demonstration of success, the project has had a very positive outcome. Qualitative and quantitative information and lessons are now available to enable considerable simplifications to be made for a new system, reducing both hardware and operation and maintenance costs. Experience and lessons are presented, particularly in relation to: system performance in various environmental conditions; design philosophies for collectors, the array, control systems, engine and plant; operation and maintenance strategies and cost reducing possibilities. Experience so far gives encouragement for the future of such paraboloidal dish systems in appropriate areas.

  19. Newfoundland Power's operations update

    International Nuclear Information System (INIS)

    Operational changes in Newfoundland Power's operations were described. Recent automation efforts in the form of new local area network (LAN) systems, and various software applications were highlighted. Other developments included initiation of a quality assurance control process, changes in CSS infrastructure, development of a corporate information plan (CIP), initiation of a workflow evaluation project, dealing mostly with automation using workgroup software. New performance of disaster recovery tests were introduced, a FAX server was implemented and a Direct Load Control pilot project using PCs on the LAN systems for control,was designed. A street light survey was initiated, and a Canada-wide phone directory for use by the customer accounting department was installed. Word processing was standardized to WordPerfect Version 6.0 for DOS, Windows was implemented as the standard graphical user interface, a mailroom review was initiated and several computer training courses, and a computer help desk were put in place

  20. Tevatron lower temperature operation

    International Nuclear Information System (INIS)

    This year saw the completion of three accelerator improvement projects (AIP) and two capital equipment projects pertaining to the Tevatron cryogenic system. The projects result in the ability to operate the Tevatron at lower temperature, and thus higher energy. Each project improves a subsystem by expanding capabilities (refrigerator controls), ensuring reliability (valve box, subatmospheric hardware, and compressor D), or enhancing performance (cold compressors and coldbox II). In January of 1994, the Tevatron operated at an energy of 975 GeV for the first time. This was the culmination, of many years of R ampersand D, power testing in a sector (one sixth) of the Tevatron, and final system installation during the summer of 1993. Although this is a modest increase in energy, the discovery potential for the Top quark is considerably improved

  1. Financing Canadian international operations

    International Nuclear Information System (INIS)

    A primer on financing international operations by Canadian corporations was provided. Factors affecting the availability to project finance (location, political risk), the various forms of financing (debt, equity, and combinations), the main sources of government backed financing to corporations (the International Finance Corporation) (IFC), the European Bank for Reconstruction and Development (EBRD), the Asian Development Bank (ADB), the Overseas Property Insurance Corporation (OPIC), government or agency guarantees, political risk coverage, the use of offshore financial centres, and the where, when and how these various organizations operate, were reviewed. Examples of all of the above, taken from the experiences of Canadian Occidental Petroleum of Calgary in the U.S., in South America, in the Middle and Far East, and in Kazakhstan, were used as illustrations. figs

  2. Operational and environmental safety

    International Nuclear Information System (INIS)

    The responsibility of the DOE Office of Operational and Environmental Safety is to assure that DOE-controlled activities are conducted in a manner that will minimize risks to the public and employees and will provide protection for property and the environment. The program supports the various energy technologies by identifying and resolving safety problems; developing and issuing safety policies, standards, and criteria; assuring compliance with DOE, Federal, and state safety regulations; and establishing procedures for reporting and investigating accidents in DOE operations. Guidelines for the radiation protection of personnel; radiation monitoring at nuclear facilities; an assessment of criticality accidents by fault tree analysis; and the preparation of environmental, safety, and health standards applicable to geothermal energy development are discussed

  3. Airline Operations Aid

    Science.gov (United States)

    1993-01-01

    C Language Integrated Production System (CLIPS), a NASA-developed expert systems program, is used by American Airlines for three purposes: as a rapid prototyping tool; to develop production prototypes; and to develop production application. An example of the latter is CLIPS' use in "Hub S1AAshing," a knowledge based system that recommends contingency plans when severe schedule reductions must be made. Hub S1AAshing has replaced a manual, labor intensive process. It saves time and allows Operations Control Coordinators to handle more difficult situations. Because the system assimilates much of the information necessary to facilitate educated decision making, it minimizes negative impact in situations where it is impossible to operate all flights.

  4. Hurricane slams gulf operations

    International Nuclear Information System (INIS)

    This paper reports that reports of damage by Hurricane Andrew escalated last week as operators stepped up inspections of oil and gas installations in the Gulf of Mexico. By midweek, companies operating in the gulf and South Louisiana were beginning to agree that earlier assessments of damage only scratched the surface. Damage reports included scores of lost, toppled, or crippled platforms, pipeline ruptures, and oil slicks. By midweek the U.S. coast Guard had received reports of 79 oil spills. Even platforms capable of resuming production in some instances were begin curtailed because of damaged pipelines. Offshore service companies the another 2-4 weeks could be needed to fully assess Andrew's wrath. Lack of personnel and equipment was slowing damage assessment and repair

  5. Cyclone incinerator: operating experience

    International Nuclear Information System (INIS)

    The cyclone incinerator, developed at Mound in the mid to late 1970's, has proven to be a valuable tool for the volume reduction of the plant's combustible radioactive wastes. The incinerator has affected a significant reduction in Mound's offsite waste shipping requirements. More than 27 tons of plutonium-contaminated wastes have been incinerated in the system at volume reduction factors of greater than 95%. Moreover, the extreme simplicity of the system in principle, design, components, and operation has resulted in extremely low maintenance cost and real plant cost savings in waste handling and disposal over the past several years. The cyclone incinerator has more potential plant users than available operating time. In addition to burning dry solids, incineration feasibility has been demonstrated for wastes presenting special disposal problems to the plant. These wastes include combustible liquids, scintillation vials, and tritium contaminated dry solid wastes

  6. Operational discipline and microenterprises

    Directory of Open Access Journals (Sweden)

    Francisca Rosales Gómez

    2015-06-01

    Full Text Available The aim of this study is to identify the elements of the operational Discipline in the business of micro-enterprises in Coatzacoalcos, Mexico. For the analysis an instrument is designed and applied to 20 companies which fulfill the suggested recommendations in research such as caution in the use of hazardous materials, use of equipment with simple specifications and easily accessible to employees, monitoring of some standard to identify risks, good environmental management, among others. We conclude that despite the findings in the application of the methodology of Operational Discipline, it is generally suffers from many important practices, and can be considered as construction companies of the city of Coatzacoalcos no mandatory environmental care this activity.

  7. TOKM hardware operation manual

    International Nuclear Information System (INIS)

    This manual describes the detector design features, performance, and operating characteristics of the Tokai-1 spent fuel monitor. The system includes a pair of monitors-one for the primary (normal) fuel transfer chute and one for the by-pass fuel transfer chute. Each monitor contains four independent detector tubes to provide direction of travel and redundancy. There are two ion chambers and two 3He tubes inside each detector package. All of the detectors are used to monitor the presence of spent-fuel gamma rays as the fuel rods pass alongside the detector package. Gamma-ray and neutron detector (GRAND) electronics supply power to the ion chambers and 3He tubes, and the data is collected in the GRAND and the Kontron computer. The system is designed to operate unattended with data pickup by the inspectors on a 90-day period. This manual gives the performance and calibration parameters

  8. Gyrokinetic linearized Landau collision operator

    DEFF Research Database (Denmark)

    Madsen, Jens

    2013-01-01

    The full gyrokinetic electrostatic linearized Landau collision operator is calculated including the equilibrium operator, which represents the effect of collisions between gyrokinetic Maxwellian particles. First, the equilibrium operator describes energy exchange between different plasma species...

  9. Toeplitz Operators on Dirichlet Spaces

    Institute of Scientific and Technical Information of China (English)

    Yu Feng LU; Shun Hua SUN

    2001-01-01

    In this paper we study Toeplitz operators on Dirichlet spaces and describe the boundedness and compactness of Toeplitz operators on Dirichlet spaces. Meanwhile. we give density theorems for Toeplitz operators on Dirichlet spaces

  10. NPP operation, 2001

    International Nuclear Information System (INIS)

    Results of NPP service in 2001 on a global scale are presented. Numerical data on service indexes of NPP in different countries are reviewed. Summary power of operating NPP in 2001 was as much as 372 857 MW. List of ten NPP having the best characteristics in electric power generation on one nuclear bock is given. Nuclear power plants of Germany were recognized as the best units on a global scale

  11. Embedded operating system projects

    OpenAIRE

    Grapentin, Andreas; Heidler, Kirstin; Korsch, Dimitri; Kumar Sah, Rakesh; Kunzmann, Nicco; Henning, Johannes; Mattis, Toni; Rein, Patrick; Seckler, Eric; Groneberg, Björn; Zimmermann, Florian

    2013-01-01

    In today’s life, embedded systems are ubiquitous. But they differ from traditional desktop systems in many aspects – these include predictable timing behavior (real-time), the management of scarce resources (memory, network), reliable communication protocols, energy management, special purpose user-interfaces (headless operation), system configuration, programming languages (to support software/hardware co-design), and modeling techniques. Within this technical report, authors present results...

  12. Energy operations policy

    International Nuclear Information System (INIS)

    It is reported that energy policy was designed following the European Bank for Reconstruction and Development review of the most pressing energy issues confronting Central and Eastern Europe and the republics of the former Soviet Union. The main features of the policy described in the document set the general framework for the Bank's energy operations. Energy strategies for particular countries are designed as an integral part of the Bank's individual country strategies. Tabs

  13. Explicit Fourier wavefield operators

    Science.gov (United States)

    Ferguson, R. J.; Margrave, G. F.

    2006-04-01

    Explicit wavefield extrapolators are based on direct analytic mathematical formulae that express the output as an extrapolation operator acting on the input, while implicit methods usually require the calculation of the numerical inverse of a matrix to obtain the output. Typically, explicit methods are faster than implicit methods, and they often give more insight into the physics of the wave propagation, but they often suffer from instability. Four different explicit extrapolators based on Fourier theory are presented and analysed. They are: PS (ordinary phase shift), GPSPI (generalized phase shift plus interpolation), NSPS (non-stationary phase shift) and SNPS (symmetric non-stationary phase shift). A formal proof is given that NSPS in a direction orthogonal to the velocity gradient is the mathematical adjoint process to GPSPI in the opposite direction. This motivates the construction of SNPS that combines NSPS and GPSPI in a symmetric fashion. This symmetry (under interchange of input and output lateral coordinates) is required by reciprocity arguments. PS and SNPS are symmetric while NSPS and GPSPI are not. A numerical stability study using SVD (singular value decomposition) shows that all of these extrapolators can become unstable for strong lateral velocity gradients. Unstable operators allow amplitudes to grow non-physically in a recursion. Stability is enhanced by introducing a small (~3 per cent) imaginary component to the velocities. This causes a numerical attenuation that tends to stabilize the operators but does not address the cause of the instability. For the velocity model studied (a very challenging case) GPSPI and NSPS have exactly the same instability while SNPS is always more stable. Instability manifests in a complicated way as a function of extrapolation step size, frequency, velocity gradient, and strength of numerical attenuation. The SNPS operator can be stabilized over a wide range of conditions with considerably less attenuation than is

  14. Distributed operating systems

    OpenAIRE

    Mullender, Sape J.

    1987-01-01

    In the past five years, distributed operating systems research has gone through a consolidation phase. On a large number of design issues there is now considerable consensus between different research groups. In this paper, an overview of recent research in distributed systems is given. In turn, the paper discusses overall system structure, protection issues, file system designs, problems and solutions for fault tolerance and a mechanism that is rapidly becoming very important for efficient d...

  15. Education Payload Operation - Demonstrations

    Science.gov (United States)

    Keil, Matthew

    2009-01-01

    Education Payload Operation - Demonstrations (EPO-Demos) are recorded video education demonstrations performed on the International Space Station (ISS) by crewmembers using hardware already onboard the ISS. EPO-Demos are videotaped, edited, and used to enhance existing NASA education resources and programs for educators and students in grades K-12. EPO-Demos are designed to support the NASA mission to inspire the next generation of explorers.

  16. Preparation to exceptional operations

    International Nuclear Information System (INIS)

    Preparation to special maintenance operations requires a specific approach according to the considered intervention type. Replacement of vapor generators is representative of a kind of intervention where technics is generally only an adaptation to the power plant context of processes already in application in construction, and where methodology, planning and organization have an important role because of the variety and the quantity of taskworks to be done, the involved manpower, the dosimetry and time lag requirements

  17. Operating mine fans

    Energy Technology Data Exchange (ETDEWEB)

    Kovalevskaya, V.I.; Fal' kov, B.S.; Spivak, V.A.

    1983-01-01

    The operation and repair of ventilation fans are described. Data are presented on periodicity and order of servicing, and organization of repairs. Repair variants of the least reliable assemblies are indicated. Methods are discussed for improving pressure and performance of the fans, and for decreasing electricity consumption. Aerodynamic and strength tests are considered, and plans for control and automation of electric drive are put forward. (In Russian)

  18. Intensionalisation of Logical Operators

    Czech Academy of Sciences Publication Activity Database

    Punčochář, Vít

    London : College Publications, 2014 - (Dančák, M.; Punčochář, V.), s. 173-185 ISBN 978-1-84890-144-5. [ Logica 2013. Hejnice (CZ), 17.06.2013-21.06.2013] R&D Projects: GA ČR(CZ) GA13-21076S Institutional support: RVO:67985955 Keywords : semantics * assertibility * intensionality * logica l operators * natural deduction Subject RIV: AA - Philosophy ; Religion

  19. Operational Risk Management

    OpenAIRE

    Jacques Pezier

    2012-01-01

    We view risk management as an integral part of good management. Risk management should take a balanced view of decision problems encompassing all significant risks and rewards. Operational risks are only one type of risks and therefore are only one piece in the jigsaw puzzle that only makes sense when all pieces are assembled. All risk analyses are based on the same general principles – generation of alternatives, quantification of uncertainties and preferences, modeling of consequences – but...

  20. Nuclear operations dictionary

    International Nuclear Information System (INIS)

    In less than fifty years, a sophisticated technical language has developed worldwide around broad-ranging operations in the field of nuclear technology. In South Africa the need to adapt this new technical language in an orderly and acceptable manner for common use was identified. The aim of this dictionary is to promote the use of correct nuclear technology in both English and Afrikaans, and to aid in the translation of nuclear terms from English into Afrikaans

  1. 88-Inch Cyclotron operations

    International Nuclear Information System (INIS)

    The 88-Inch Cyclotron, operated by the Nuclear Science Division, provides a large fraction of the beam time that is used by Division scientists. Variable energy high resolution beams from hydrogen through argon are produced and used for studies of nuclear structure and nuclear reaction mechanisms. The cyclotron is also the Laboratory's major source of medical isotopes and its only source of polarized proton and deuteron beams. Ions as heavy as 40Ar can be accererated to the Coulomb barrier of 5 MeV/nucleon, while lighter heavy ions can reach 20-30 MeV/nucleon. The cyclotron thus operates in the important transition region between low and high energies: 10-30 MeV/nucleon. As a national accelerator laboratory the 88-Inch Cyclotron is used extensively by outside groups from many institutions in the US and abroad. The 88-Inch Cyclotron also plays a significant educational role. In 1983 twelve graduate students from the University of California at Berkeley employed this facility in their research toward the Ph.D. degree. Five students received their doctorates from UCB in 1983 for research done at the cyclotron. Eleven graduate students from other universities participated in research at the cyclotron. The cyclotron now operates 14 1/2 eight hour shifts per week with one additional shift for maintenance at the beginning of the week and one half shift for shutdown for the weekend. It was operated for 20 shifts per week until October 1981 when increased power rates and budget limitations made the reduction in running time necessary. Several improvement programs are ongoing

  2. Operation and development 1999

    International Nuclear Information System (INIS)

    This issue of the Technical Report on the Accelerators describes the operations for physics experiments and beam tests, various technical improvements and ongoing projects during the year 1999. As usual, the first chapter reports on the standard operation of GANIL with stable ions, with analysis of the beam time distribution and statistics, including failures. A major project was the production and subsequent acceleration, over a long period of time, of an intense 58Ni11+ beam produced using the MIVOC method, which contributed strongly to the discovery of the doubly-magic 48Ni element. The renovation and development program (Chapter 2), including methods for producing metallic ion beams, gathered speed thanks to the completion of SPIRAL. A large share of these projects were high-intensity oriented. This trend also obviously applies to projects directly linked to the THI operation. In a special test, a 1.3 x 1013 pps 13C beam (later raised to 2 x 1013 pps for several hours) was accelerated and extracted from SSC2 at an energy of 75 MeV/n. Simultaneously, comparisons were made between simulations and beam test results for a clearer understanding of space charge effects on accelerator transmission efficiency. Chapter 3 covers the THI related projects. The final chapter deals with IRRSUD. This project, which is funded and on the way to completion, uses low energy beams delivered by the two injector cyclotrons for industrial applications and research, such as nano-technologies and simulation of defects in solids. (author)

  3. CH Packaging Operations Manual

    International Nuclear Information System (INIS)

    This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing 'Short' 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing 'Tall' 85-gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing SWB Payload Assembly; and 1.7, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence.

  4. CH Packaging Operations Manual

    International Nuclear Information System (INIS)

    This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing 'Short' 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing 'Tall' 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

  5. Phenix operating experience

    International Nuclear Information System (INIS)

    The fast breeder reactor equipping the PHENIX plant has been in operation for 17 years. Apart from electricity production, operation of the 250 MWe reactor had the following positive results: - it proved that such a reactor could be operated without major difficulties and with a high energy availability factor, - it provided opportunities for fast breeder fuel optimization, - it yielded a certain number of safety lessons of interest in the context of breeder development work. The incidents which have occurred in recent years will be discussed in detail, with attention to the lessons drawn. After reviewing these different events, we shall present various surveys and structural provisions implemented with a view to confirming reactor safety and enhancing certain aspects of it, particularly in the light of the general lessons learned from the Three Mile Island and Chernobyl accidents. Examples will be discussed, such as the tests and inspections carried out during the second ten-yearly shutdown in 1989 (general overhaul), and the definition of procedures to be adopted in case of accidents at the limits or beyond the design basis situations. (author)

  6. Operational health physics training

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-06-01

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of {alpha}, {beta}, {gamma}, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included.

  7. Operational health physics training

    International Nuclear Information System (INIS)

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of α, β, γ, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included

  8. Improving operating room schedules.

    Science.gov (United States)

    Li, Fei; Gupta, Diwakar; Potthoff, Sandra

    2016-09-01

    Operating rooms (ORs) in US hospitals are costly to staff, generate about 70 % of a hospital's revenues, and operate at a staffed-capacity utilization of 60-70 %. Many hospitals allocate blocks of OR time to individual or groups of surgeons as guaranteed allocation, who book surgeries one at a time in their blocks. The booking procedure frequently results in unused time between surgeries. Realizing that this presents an opportunity to improve OR utilization, hospitals manually reschedule surgery start times one or two days before each day of surgical operations. The purpose of rescheduling is to decrease OR staffing costs, which are determined by the number of concurrently staffed ORs. We formulate the rescheduling problem as a variant of the bin-packing problem with interrelated items, which are the surgeries performed by the same surgeon. We develop a lower bound (LB) construction algorithm and prove that the LB is at least (2/3) of the optimal staffing cost. A key feature of our approach is that we allow hospitals to have two shift lengths. Our analytical results form the basis of a branch-and-bound algorithm, which we test on data obtained from three hospitals. Experiments show that rescheduling saves significant staffing costs. PMID:25687390

  9. Phenix operating experience

    International Nuclear Information System (INIS)

    The fast breeder reactor equipping the PHENIX plant has been in operation for 17 years. Apart from electricity production, operation of the 250 MWe reactor had the following positive results: - it proved that such a reactor could be operated without major difficulties and with a high energy availability factor, - it provided opportunities for fast breeder fuel optimization, - it yielded a certain number of safety lessons of interest in the context of breeder development work. The incidents which have occurred in recent years will be discussed in detail, with attention to the lessons drawn. After reviewing these different events, we shall present various surveys and structural provisions implemented with a view to confirming reactor safety and enhancing certain aspects of it, particularly in the light of the general lessons learned from the Three Mile Island and Chernobyl accidents. Examples will be discussed, such as the tests and inspections carried out during the second ten-yearly shutdown in 1989 (general overhaul), and the definition of procedures to be adopted in case of accidents at the limits or beyond the design basis situations

  10. ILC Operating Scenarios

    International Nuclear Information System (INIS)

    The ILC Technical Design Report documents the design for the construction of a linear collider which can be operated at energies up to 500 GeV. This report summarizes the outcome of a study of possible running scenarios, including a realistic estimate of the real time accumulation of integrated luminosity based on ramp-up and upgrade processes. The evolution of the physics outcomes is emphasized, including running initially at 500 GeV, then at 350 GeV and 250 GeV. The running scenarios have been chosen to optimize the Higgs precision measurements and top physics while searching for evidence for signals beyond the standard model, including dark matter. In addition to the certain precision physics on the Higgs and top that is the main focus of this study, there are scientific motivations that indicate the possibility for discoveries of new particles in the upcoming operations of the LHC or the early operation of the ILC. Follow-up studies of such discoveries could alter the plan for the centre-of-mass collision energy of the ILC and expand the scientific impact of the ILC physics program. It is envisioned that a decision on a possible energy upgrade would be taken near the end of the twenty year period considered in this report.

  11. Regulations for RA reactor operation

    International Nuclear Information System (INIS)

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions

  12. Monitoring and controlling unit operations

    OpenAIRE

    Cypes, Stephen; Uhrich, M; Carlson, Eric; Kolosov, Oleg; Padowitz, David; Bennett, James; Matsiev, L

    2007-01-01

    Fluid sensor methods and systems adapted for monitoring and/or controlling distillation operations in fluidic systems, such as batch distillation operations or continuous distillation operations, are disclosed. Preferred embodiments are directed to process monitoring and/or process control for unit operations involving endpoint detemlination of a distillation, for example, as applied to a liquid-componentswitching operation (e.g., a solvent switching operation), a liquid-liquid separation ope...

  13. Local operators' role in NPC operation and their career development

    International Nuclear Information System (INIS)

    Operation staff is the key of generating electricity in the nuclear power plant. They make sure the safety and profit of NPC. Operation of NPC depends on shift staff and local operators help RO in MCR to handle the power production with facing the equipment directly. The following describes local operators how to play important roles in AP1000 unit operation. Meanwhile, their training and career development also are referred to. (authors)

  14. Operator algebras and topology

    International Nuclear Information System (INIS)

    These notes, based on three lectures on operator algebras and topology at the 'School on High Dimensional Manifold Theory' at the ICTP in Trieste, introduce a new set of tools to high dimensional manifold theory, namely techniques coming from the theory of operator algebras, in particular C*-algebras. These are extensively studied in their own right. We will focus on the basic definitions and properties, and on their relevance to the geometry and topology of manifolds. A central pillar of work in the theory of C*-algebras is the Baum-Connes conjecture. This is an isomorphism conjecture, as discussed in the talks of Luck, but with a certain special flavor. Nevertheless, it has important direct applications to the topology of manifolds, it implies e.g. the Novikov conjecture. In the first chapter, the Baum-Connes conjecture will be explained and put into our context. Another application of the Baum-Connes conjecture is to the positive scalar curvature question. This will be discussed by Stephan Stolz. It implies the so-called 'stable Gromov-Lawson-Rosenberg conjecture'. The unstable version of this conjecture said that, given a closed spin manifold M, a certain obstruction, living in a certain (topological) K-theory group, vanishes if and only M admits a Riemannian metric with positive scalar curvature. It turns out that this is wrong, and counterexamples will be presented in the second chapter. The third chapter introduces another set of invariants, also using operator algebra techniques, namely L2-cohomology, L2-Betti numbers and other L2-invariants. These invariants, their basic properties, and the central questions about them, are introduced in the third chapter. (author)

  15. Categorizing operational radioactive wastes

    International Nuclear Information System (INIS)

    The primary objective of this publication is to improve communications among waste management professionals and Member States relative to the properties and status of radioactive waste. This is accomplished by providing a standardized approach to operational waste categorization using accepted industry practices and experience. It is a secondary objective to draw a distinction between operational waste categorization and waste disposal classification. The approach set forth herein is applicable to waste generation by mature (major, advanced) nuclear programmes, small-to-medium sized nuclear programmes, and programmes with waste from other nuclear applications. It can be used for planning, developing or revising categorization methodologies. For existing categorization programmes, the approach set forth in this publication may be used as a validation and evaluation tool for assessing communication effectiveness among affected organizations or nations. This publication is intended for use by waste management professionals responsible for creating, implementing or communicating effective categorization, processing and disposal strategies. For the users of this publication, it is important to remember that waste categorization is a communication tool. As such, the operational waste categories are not suitable for regulatory purposes nor for use in health and safety evaluations. Following Section 1 (Introduction) Section 2 of this publication defines categorization and its relationship to existing waste classification and management standards, regulations and practices. It also describes the benefits of a comprehensive categorization programme and fundamental record considerations. Section 3 provides an overview of the categorization process, including primary categories and sub-categories. Sections 4 and 5 outline the specific methodology for categorizing unconditioned and conditioned wastes. Finally, Section 6 provides a brief summary of critical considerations that

  16. Operation and development 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This issue of the Technical Report on the Accelerators describes the operations for physics experiments and beam tests, various technical improvements and ongoing projects during the year 1999. As usual, the first chapter reports on the standard operation of GANIL with stable ions, with analysis of the beam time distribution and statistics, including failures. A major project was the production and subsequent acceleration, over a long period of time, of an intense {sub 58}Ni{sup 11+} beam produced using the MIVOC method, which contributed strongly to the discovery of the doubly-magic {sub 48}Ni element. The renovation and development program (Chapter 2), including methods for producing metallic ion beams, gathered speed thanks to the completion of SPIRAL. A large share of these projects were high-intensity oriented. This trend also obviously applies to projects directly linked to the THI operation. In a special test, a 1.3 x 10{sup 13} pps {sub 13}C beam (later raised to 2 x 10{sup 13} pps for several hours) was accelerated and extracted from SSC2 at an energy of 75 MeV/n. Simultaneously, comparisons were made between simulations and beam test results for a clearer understanding of space charge effects on accelerator transmission efficiency. Chapter 3 covers the THI related projects. The final chapter deals with IRRSUD. This project, which is funded and on the way to completion, uses low energy beams delivered by the two injector cyclotrons for industrial applications and research, such as nano-technologies and simulation of defects in solids. (author)

  17. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  18. CMS analysis operations

    International Nuclear Information System (INIS)

    During normal data taking CMS expects to support potentially as many as 2000 analysis users. Since the beginning of 2008 there have been more than 800 individuals who submitted a remote analysis job to the CMS computing infrastructure. The bulk of these users will be supported at the over 40 CMS Tier-2 centres. Supporting a globally distributed community of users on a globally distributed set of computing clusters is a task that requires reconsidering the normal methods of user support for Analysis Operations. In 2008 CMS formed an Analysis Support Task Force in preparation for large-scale physics analysis activities. The charge of the task force was to evaluate the available support tools, the user support techniques, and the direct feedback of users with the goal of improving the success rate and user experience when utilizing the distributed computing environment. The task force determined the tools needed to assess and reduce the number of non-zero exit code applications submitted through the grid interfaces and worked with the CMS experiment dashboard developers to obtain the necessary information to quickly and proactively identify issues with user jobs and data sets hosted at various sites. Results of the analysis group surveys were compiled. Reference platforms for testing and debugging problems were established in various geographic regions. The task force also assessed the resources needed to make the transition to a permanent Analysis Operations task. In this presentation the results of the task force will be discussed as well as the CMS Analysis Operations plans for the start of data taking.

  19. IBRD Operational Decision Framework

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, R; Hibbard, W; Raber, E; Carlsen, T; Folks, K; MacQueen, D; Mancieri, S; Bunt, T; Richards, J; Hirabayashi-Dethier, J

    2010-11-12

    The IBRD Operational Decision Framework in this document is an expansion of an emerging general risk management framework under development by an interagency working group. It provides the level of detail necessary to develop a general Consequence Management Guidance Document for biological contamination remediation and restoration. It is the intent of this document to support both wide area and individual site remediation and restoration activities. This product was initiated as a portion of the IBRD Task 1 Systems Analysis to aid in identification of wide area remediation and restoration shortcomings and gaps. The draft interagency general risk management framework was used as the basis for the analysis. The initial Task 1 analysis document expanded the draft interagency framework to a higher level of resolution, building on both the logic structure and the accompanying text explanations. It was then employed in a qualitative manner to identify responsible agencies, data requirements, tool requirements, and current capabilities for each decision and task. This resulted in identifying shortcomings and gaps needing resolution. Several meetings of a joint LLNL/SNL working group reviewed and approved the initial content of this analysis. At the conclusion of Task 1, work continued on the expanded framework to generate this Operational Decision Framework which is consistent with the existing interagency general risk management framework. A large LLNL task group met repeatedly over a three-month period to develop the expanded framework, coordinate the framework with the biological remediation checklist, and synchronize the logic with the Consequence Management Plan table of contents. The expanded framework was briefed at a large table top exercise reviewing the interagency risk management framework. This exercise had representation from major US metropolitan areas as well as national agencies. This product received positive comments from the participants. Upon

  20. What an Operation

    Institute of Scientific and Technical Information of China (English)

    LISA; CARDUCCI

    2006-01-01

    Every year I take a PAP test, or a CTC as it is called in China. Last August, I was diagnosed with a uterine polypus. A "tumor?" Though a polypus is seldom cancerous, doctors insisted I have a biopsy. Were they concerned because I'm a foreigner or did they want to make money out of me? I preferred having the tumor removed rather than only a biopsy. They agreed. Before I knew it I was on the operation table after an electrocardiogram and a simple blood test.

  1. A science of operations

    CERN Document Server

    Priestley, Mark

    2011-01-01

    Today, computers fulfil a dazzling array of roles, a flexibility resulting from the great range of programs that can be run on them. A Science of Operations examines the history of what we now call programming, defined not simply as computer programming, but more broadly as the definition of the steps involved in computations and other information-processing activities. This unique perspective highlights how the history of programming is distinct from the history of the computer, despite the close relationship between the two in the 20th century. The book also discusses how the development of

  2. ALMA science operations

    Science.gov (United States)

    Nyman, Lars-Åke; Andreani, Paola; Hibbard, John; Okumura, Sachiko K.

    2010-07-01

    The ALMA (Atacama Large Millimeter/submillimeter Array) project is an international collaboration between Europe, East Asia and North America in cooperation with the Republic of Chile. The ALMA Array Operations Site (AOS) is located at Chajnantor, a plateau at an altitude of 5000 m in the Atacama desert in Chile, and the ALMA Operations Support Facility (OSF) is located near the AOS at an altitude of 2900 m. ALMA will consist of an array of 66 antennas, with baselines up to 16 km and state-of-the-art receivers that cover all the atmospheric windows up to 1 THz. An important component of ALMA is the compact array of twelwe 7-m and four 12-m antennas (the Atacama Compact Array, ACA), which will greatly enhance ALMA's ability to image extended sources. Construction of ALMA started in 2003 and will be completed in 2013. Commissioning started in January 2010 and Early Science Operations is expected to start during the second half of 2011. ALMA science operations is provided by the Joint ALMA Observatory (JAO) in Chile, and the three ALMA Regional Centers (ARCs) located in each ALMA region - Europe, North America and East Asia. ALMA observations will take place 24h per day, interrupted by maintenance periods, and will be done in service observing mode with flexible (dynamic) scheduling. The observations are executed in the form of scheduling blocks (SBs), each of which contains all information necessary to schedule and execute the observations. The default output to the astronomer will be pipeline-reduced images calibrated according to the calibration plan. The JAO is responsible for the data product quality. All science and calibration raw data are captured and archived in the ALMA archive, a distributed system with nodes at the OSF, the Santiago central office and the ARCs. Observation preparation will follow a Phase 1/Phase 2 process. During Phase 1, observation proposals will be created using software tools provided by the JAO and submitted for scientific and

  3. GMRES and integral operators

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, C.T.; Xue, Z.Q. [North Carolina State Univ., Raleigh, NC (United States)

    1994-12-31

    Many discretizations of integral equations and compact fixed point problems are collectively compact and strongly convergent in spaces of continuous functions. These properties not only lead to stable and convergent approximations but also can be used in the construction of fast multilevel algorithms. Recently the GMRES algorithm has become a standard coarse mesh solver. The purpose of this paper is to show how the special properties of integral operators and their approximations are reflected in the performance of the GMRES iteration and how these properties can be used to strengthen the norm in which convergence takes place. The authors illustrate these ideas with composite Gauss rules for integral equations on the unit interval.

  4. On operator strategic behavior

    Science.gov (United States)

    Hancock, P. A.

    1991-01-01

    Deeper and more detailed knowledge as to how human operators such as pilots respond, singly and in groups, to demands on their performance which arise from technical systems will support the manipulation of such systems' design in order to accommodate the foibles of human behavior. Efforts to understand how self-autonomy impacts strategic behavior and such related issues as error generation/recognition/correction are still in their infancy. The present treatment offers both general and aviation-specific definitions of strategic behavior as precursors of prospective investigations.

  5. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka;

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements and...... supply uncertainty were identified as particularly critical for the S&OP process. It was found that there is a great potential for S&OP in the food industry, foremost to cope with the imbalances between demand and supply and to create prerequisites for a stable production process....

  6. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka;

    2015-01-01

    This paper investigates sales and operations planning (S&OP) at four Scandinavian industrial food producers in order to explore how the use of S&OP might help leaders to deal with the challenges set by the planning environment. Variables connected to the product and market, e.g., frequency of new...... product development, customer service levels, and supply uncertainty, were identified as particularly critical for the S&OP process. It was found that there is great potential for S&OP in the food industry, foremost to cope with the imbalances between demand and supply and to create prerequisites for a...

  7. Revamping Spacecraft Operational Intelligence

    Science.gov (United States)

    Hwang, Victor

    2012-01-01

    The EPOXI flight mission has been testing a new commercial system, Splunk, which employs data mining techniques to organize and present spacecraft telemetry data in a high-level manner. By abstracting away data-source specific details, Splunk unifies arbitrary data formats into one uniform system. This not only reduces the time and effort for retrieving relevant data, but it also increases operational visibility by allowing a spacecraft team to correlate data across many different sources. Splunk's scalable architecture coupled with its graphing modules also provide a solid toolset for generating data visualizations and building real-time applications such as browser-based telemetry displays.

  8. Inching toward an Operating Measure.

    Science.gov (United States)

    Fischer, Mary; Gordon, Teresa P.

    2002-01-01

    Discusses what independent institutions of higher education said when surveyed about financial reporting practices and the desirability of an operating measure. Describes findings concerning who reports an operating measure, what is included as operating revenue, what is included as operating expense, how related disclosures are handled, and the…

  9. Generalized Integral Operators and Applications

    CERN Document Server

    Bernard, Séverine; Delcroix, Antoine; 10.1017/S0305004106009327

    2009-01-01

    We extend the theory of distributional kernel operators to a framework of generalized functions, in which they are replaced by integral kernel operators. Moreover, in contrast to the distributional case, we show that these generalized integral operators can be composed unrestrictedly. This leads to the definition of the exponential, and more generally entire functions, of a subclass of such operators.

  10. Operator representations in Kramers bases

    DEFF Research Database (Denmark)

    Aucar, G. A.; Jensen, H. J Aa; Oddershede, J.

    1995-01-01

    Using the time-reversal symmetry operations, we introduce the time-reversal adapted Kramers basis operators Xpq± which are the natural expansion set for any relativistic Hermitian or anti-Hermitian one-electron operator and thus replace the spin-adapted basis operators of non-relativistic quantum...

  11. Generalized Integral Operators and Applications

    OpenAIRE

    Bernard, Séverine; Colombeau, Jean-François; Delcroix, Antoine

    2005-01-01

    We extend the theory of distributional kernel operators to a framework of generalized functions, in which they are replaced by integral kernel operators. Moreover, in contrast to the distributional case, we show that these generalized integral operators can be composed unrestrictedly. This leads to the definition of the exponential, and more generally entire functions, of a subclass of such operators.

  12. Tractor Operation and Daily Care.

    Science.gov (United States)

    Fore, J. M.; And Others

    Written for the tractor operator, the manual describes, with the aid of colored illustrations and diagrams, the tasks involved in the proper operation and daily maintenance of tractors. It offers explanations for the desirability of the various servicing and adjustment operations, as well as guidelines for tractor operation and safety. The…

  13. Improving operational plume forecasts

    Science.gov (United States)

    Balcerak, Ernie

    2012-04-01

    Forecasting how plumes of particles, such as radioactive particles from a nuclear disaster, will be transported and dispersed in the atmosphere is an important but computationally challenging task. During the Fukushima nuclear disaster in Japan, operational plume forecasts were produced each day, but as the emissions continued, previous emissions were not included in the simulations used for forecasts because it became impractical to rerun the simulations each day from the beginning of the accident. Draxler and Rolph examine whether it is possible to improve plume simulation speed and flexibility as conditions and input data change. The authors use a method known as a transfer coefficient matrix approach that allows them to simulate many radionuclides using only a few generic species for the computation. Their simulations work faster by dividing the computation into separate independent segments in such a way that the most computationally time consuming pieces of the calculation need to be done only once. This makes it possible to provide real-time operational plume forecasts by continuously updating the previous simulations as new data become available. They tested their method using data from the Fukushima incident to show that it performed well. (Journal of Geophysical Research-Atmospheres, doi:10.1029/2011JD017205, 2012)

  14. Operations dashboard: comparative study

    Science.gov (United States)

    Ramly, Noor Nashriq; Ismail, Ahmad Zuhairi; Aziz, Mohd Haris; Ahmad, Nurul Haszeli

    2011-10-01

    In this present days and age, there are increasing needs for companies to monitor application and infrastructure health. Apart from having proactive measures to secure their application and infrastructure, many see monitoring dashboards as crucial investment in disaster preparedness. As companies struggle to find the best solution to cater for their needs and interest for monitoring their application and infrastructure's health, this paper summarizes the studies made on several known off-the-shelf operations dashboard and in-house developed dashboard. A few criteria of good dashboard are collected from previous studies carried out by several researchers and rank them according to importance and business needs. The finalized criteria that will be discussed in later sections are data visualization, performance indicator, dashboard personalization, audit capability and alert/ notification. Comparative studies between several popular dashboards were then carried out to determine whether they met these criteria that we derived from the first exercise. The findings hopefully can be used to educate and provide an overview of selecting the best IT application and infrastructure operations dashboard that suit business needs, thus become the main contribution of this paper.

  15. ATLAS solenoid operates underground

    CERN Multimedia

    2006-01-01

    A new phase for the ATLAS collaboration started with the first operation of a completed sub-system: the Central Solenoid. Teams monitoring the cooling and powering of the ATLAS solenoid in the control room. The solenoid was cooled down to 4.5 K from 17 to 23 May. The first current was established the same evening that the solenoid became cold and superconductive. 'This makes the ATLAS Central Solenoid the very first cold and superconducting magnet to be operated in the LHC underground areas!', said Takahiko Kondo, professor at KEK. Though the current was limited to 1 kA, the cool-down and powering of the solenoid was a major milestone for all of the control, cryogenic, power and vacuum systems-a milestone reached by the hard work and many long evenings invested by various teams from ATLAS, all of CERN's departments and several large and small companies. Since the Central Solenoid and the barrel liquid argon (LAr) calorimeter share the same cryostat vacuum vessel, this achievement was only possible in perfe...

  16. Planck-suppressed operators

    International Nuclear Information System (INIS)

    We show that the recent Planck limits on primordial non-Gaussianity impose strong constraints on light hidden sector fields coupled to the inflaton via operators suppressed by a high mass scale Λ. We study a simple effective field theory in which a hidden sector field is coupled to a shift-symmetric inflaton via arbitrary operators up to dimension five. Self-interactions in the hidden sector lead to non-Gaussianity in the curvature perturbations. To be consistent with the Planck limit on local non-Gaussianity, the coupling to any hidden sector with light fields and natural cubic couplings must be suppressed by a very high scale Λ > 105H. Even if the hidden sector has Gaussian correlations, nonlinearities in the mixing with the inflaton still lead to non-Gaussian curvature perturbations. In this case, the non-Gaussianity is of the equilateral or orthogonal type, and the Planck data requires Λ > 102H

  17. South African Airborne Operations

    Directory of Open Access Journals (Sweden)

    McGill Alexander

    2012-02-01

    Full Text Available Airborne operations entail the delivery of ground troops and their equipment by air to their area of operations. They can also include the subsequent support of these troops and their equipment by air. Historically, and by definition, this would encompass delivery by fixed-wing powered aircraft, by glider, by parachute or by helicopter. Almost any troops can be delivered by most of these means. However, the technical expertise and physical as well as psychological demands required by parachuting have resulted in specialist troops being selected and trained for this role. Some of the material advantages of using parachute troops, or paratroops, are: the enormous strategic reach provided by the long-distance transport aircraft used to convey them; the considerable payload which these aircraft are capable of carrying; the speed with which the parachute force can deploy; and the fact that no infrastructure such as airfields are required for their arrival. Perhaps most attractively to cash-strapped governments, the light equipment scales of parachute units’ makes them economical to establish and maintain. There are also less tangible advantages: the soldiers selected are invariably volunteers with a willingness or even desire to tackle challenges; their selection and training produces tough, confident and aggressive troops, psychologically geared to face superior odds and to function independently from other units; and their initiative and self-reliance combined with a high level of physical fitness makes them suitable for a number of different and demanding roles.

  18. Autonomous Mission Operations Roadmap

    Science.gov (United States)

    Frank, Jeremy David

    2014-01-01

    As light time delays increase, the number of such situations in which crew autonomy is the best way to conduct the mission is expected to increase. However, there are significant open questions regarding which functions to allocate to ground and crew as the time delays increase. In situations where the ideal solution is to allocate responsibility to the crew and the vehicle, a second question arises: should the activity be the responsibility of the crew or an automated vehicle function? More specifically, we must answer the following questions: What aspects of mission operation responsibilities (Plan, Train, Fly) should be allocated to ground based or vehicle based planning, monitoring, and control in the presence of significant light-time delay between the vehicle and the Earth?How should the allocated ground based planning, monitoring, and control be distributed across the flight control team and ground system automation? How should the allocated vehicle based planning, monitoring, and control be distributed between the flight crew and onboard system automation?When during the mission should responsibility shift from flight control team to crew or from crew to vehicle, and what should the process of shifting responsibility be as the mission progresses? NASA is developing a roadmap of capabilities for Autonomous Mission Operations for human spaceflight. This presentation will describe the current state of development of this roadmap, with specific attention to in-space inspection tasks that crews might perform with minimum assistance from the ground.

  19. FUGM hardware operation manual

    International Nuclear Information System (INIS)

    This manual describes the detector design features, performance, and operating characteristics of the Fugen reactor gate monitor for monitoring fresh and spent fuel transfers between the core and storage ponds. This system consists of two monitors located at each end of the transfer chute. The larger monitor contains two 3He tubes, two fission chambers, and two ion chambers. The smaller monitor, used for direction of motion redundancy, contains two ion chambers. All detectors provide information for identifying the type, fresh or spent UOX or MOX fuel, and direction of the fuel transfer. The gamma-ray and neutron detector (GRAND-3) electronics package supplies power to the radiation sensors and collects the radiation data for storage on a laptop computer. The system is designed to operate unattended with data collection by the inspectors occurring on 90-day time intervals. This manual also includes radiation data for the six types of fuel transfers and equipment transfers along with the direction of motion information collected during the installation at the Fugen reactor

  20. TFTR initial operations

    International Nuclear Information System (INIS)

    The Tokamak Fusion Test Reactor (TFTR) has operated since December 1982 with ohmically heated plasmas. Routine operation with feedback control of plasma current, position, and density has been obtained for plasmas with I/sub p/ approx. = 800 kA, a = 68 cm, R = 250 cm, and B/sub t/ = 27 kG. A maximum plasma current of 1 MA was achieved with q approx. = 2.5. Energy confinement times of approx. 150 msec were measured for hydrogen and deuterium plasmas with anti n/sub e/ approx. = 2 x 1013 cm-3, T/sub e/ (0) approx. = 1.5 keV, T/sub i/ (0) approx. = 1.5 keV, and Z/sub eff/ approx. = 3. The preliminary results suggest a size-cubed scaling from PLT and are consistent with Alcator C scaling where tau approx. nR2a. Initial measurements of plasma disruption characteristics indicate current decay rates of approx. 800 kA in 8 ms which is within the TFTR design requirement of 3 MA in 3 ms

  1. Optimizing parallel reduction operations

    Energy Technology Data Exchange (ETDEWEB)

    Denton, S.M.

    1995-06-01

    A parallel program consists of sets of concurrent and sequential tasks. Often, a reduction (such as array sum) sequentially combines values produced by a parallel computation. Because reductions occur so frequently in otherwise parallel programs, they are good candidates for optimization. Since reductions may introduce dependencies, most languages separate computation and reduction. The Sisal functional language is unique in that reduction is a natural consequence of loop expressions; the parallelism is implicit in the language. Unfortunately, the original language supports only seven reduction operations. To generalize these expressions, the Sisal 90 definition adds user-defined reductions at the language level. Applicable optimizations depend upon the mathematical properties of the reduction. Compilation and execution speed, synchronization overhead, memory use and maximum size influence the final implementation. This paper (1) Defines reduction syntax and compares with traditional concurrent methods; (2) Defines classes of reduction operations; (3) Develops analysis of classes for optimized concurrency; (4) Incorporates reductions into Sisal 1.2 and Sisal 90; (5) Evaluates performance and size of the implementations.

  2. Advanced Neutron Source operating philosophy

    International Nuclear Information System (INIS)

    An operating philosophy and operations cost estimate were prepared to support the Conceptual Design Report for the Advanced Neutron Source (ANS), a new research reactor planned for the Oak Ridge National Laboratory (ORNL). The operating philosophy was part of the initial effort of the ANS Human Factors Program, was integrated into the conceptual design, and addressed operational issues such as remote vs local operation; control room layout and responsibility issues; role of the operator; simulation and training; staffing levels; and plant computer systems. This paper will report on the overall plans and purpose for the operations work, the results of the work done for conceptual design, and plans for future effort

  3. Field Operators in Real Space.

    Science.gov (United States)

    Cederbaum, Lorenz S

    2016-05-19

    Field operators are widely used in many-body theory of indistinguishable particles. In this work it is shown that these operators can be represented solely in position space. Explicit expressions for the field operators in position space are given. Using the derived expression, we further show how by generalizing operators in first quantization to arbitrary particle numbers, one can directly connect to the respective operators in second quantization. A few illustrative examples are also presented. PMID:26594868

  4. Issues in Extensible Operating Systems

    OpenAIRE

    Seltzer, Margo I.; Endo, Yasuhiro; Small, Christopher A.; Smith, Keith A.

    1997-01-01

    Operating systems research has traditionally consisted of adding functionality to the operating system or inventing and evaluating new methods for performing functions. Regardless of the research goal, the single constant has been that the size and complexity of operating systems increase over time. As a result, operating systems are usually the single most complex piece of software in a computer system, containing hundreds of thousands, if not millions, of lines of code. Today’s operating sy...

  5. Hausdorff operators on Euclidean spaces

    Institute of Scientific and Technical Information of China (English)

    CHEN Jie-cheng; FAN Da-shan; WANG Si-lei

    2013-01-01

    Hausdorff operator is an important operator raised from the dilation on Euclidean space and rooted in the classical summability of number series and Fourier series. It is also connected to many well known operators in real and complex analysis. This article is a survey of some recent developments and extensions on the Hausdorff operator. Particularly, various boundedness properties of the Hausdorff operators, studied recently by our research group, are addressed.

  6. The positive radial momentum operator

    OpenAIRE

    Mosley, Shaun N.

    2003-01-01

    The Laplacian in spherical coordinates contains the squared radial momentum operator $ p_r^2 = - r^{-1} \\partial_r^2 r $ which is Hermitian and positive. However as has been pointed out by various authors the ``radial momentum operator" $ - i r^{-1} \\partial_r r $ is not Hermitian. The positive square root operator of $ p_r^2 $ is found and also its inverse. We discuss the relation of these operators with Fourier transforms, the Hilbert transform and fractional integral operators.

  7. RHIC Polarized proton operation

    Energy Technology Data Exchange (ETDEWEB)

    Huang, H.; Ahrens, L.; Alekseev, I.G.; Aschenauer, E.; Atoian, G.; Bai, M.; Bazilevsky, A.; Blaskiewicz, M.; Brennan, J.M.; Brown, K.A.; Bruno, D.; Connolly, R.; Dion, A.; D' Ottavio, T.; Drees, K.A.; Fischer, W.; Gardner, C.; Glenn, J.W.; Gu, X.; Harvey, M.; Hayes, T.; Hoff, L.; Hulsart, R.L.; Laster, J.; Liu, C.; Luo, Y.; MacKay, W.W.; Makdisi, Y.; Marr, G.J.; Marusic, A.; Meot, F.; Mernick, K.; Michnoff, R,; Minty, M.; Montag, C.; Morris, J.; Nemesure, S.; Poblaguev, A.; Ptitsyn, V.; Ranjibar, V.; Robert-Demolaize, G.; Roser, T.; J.; Severino, F.; Schmidke, B.; Schoefer, V.; Severino, F.; Smirnov, D.; Smith, K.; Steski, D.; Svirida, D.; Tepikian, S.; Trbojevic, D.; Tsoupas, N.; Tuozzolo, J. Wang, G.; Wilinski, M.; Yip, K.; Zaltsman, A.; Zelenski, A.; Zeno, K.; Zhang, S.Y.

    2011-03-28

    The Relativistic Heavy Ion Collider (RHIC) operation as the polarized proton collider presents unique challenges since both luminosity(L) and spin polarization(P) are important. With longitudinally polarized beams at the experiments, the figure of merit is LP{sup 4}. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system is installed to improve longitudinal match at injection and to increase luminosity. The beam dump was upgraded to increase bunch intensity. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control is also improved this year. Additional efforts are put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point is chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper. Siberian snakes are essential tools to preserve polarization when accelerating polarized beams to higher energy. At the same time, the higher order resonances still can cause polarization loss. As seen in RHIC, the betatron tune has to be carefully set and maintained on the ramp and during the store to avoid polarization loss. In addition, the orbit control is also critical to preserve polarization. The higher polarization during this run comes from several improvements over last run. First we have a much better orbit on the ramp. The orbit feedback brings down the vertical rms orbit error to 0.1mm, much better than the 0.5mm last run. With correct BPM offset and vertical realignment, this rms orbit error is indeed small. Second, the jump quads in the AGS improved input polarization for RHIC. Third, the vertical tune was pushed further away from 7/10 snake resonance. The tune feedback maintained the tune at the desired value through the ramp. To calibrate the analyzing power of RHIC polarimeters at any energy above

  8. RHIC Polarized proton operation

    International Nuclear Information System (INIS)

    The Relativistic Heavy Ion Collider (RHIC) operation as the polarized proton collider presents unique challenges since both luminosity(L) and spin polarization(P) are important. With longitudinally polarized beams at the experiments, the figure of merit is LP4. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system is installed to improve longitudinal match at injection and to increase luminosity. The beam dump was upgraded to increase bunch intensity. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control is also improved this year. Additional efforts are put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point is chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper. Siberian snakes are essential tools to preserve polarization when accelerating polarized beams to higher energy. At the same time, the higher order resonances still can cause polarization loss. As seen in RHIC, the betatron tune has to be carefully set and maintained on the ramp and during the store to avoid polarization loss. In addition, the orbit control is also critical to preserve polarization. The higher polarization during this run comes from several improvements over last run. First we have a much better orbit on the ramp. The orbit feedback brings down the vertical rms orbit error to 0.1mm, much better than the 0.5mm last run. With correct BPM offset and vertical realignment, this rms orbit error is indeed small. Second, the jump quads in the AGS improved input polarization for RHIC. Third, the vertical tune was pushed further away from 7/10 snake resonance. The tune feedback maintained the tune at the desired value through the ramp. To calibrate the analyzing power of RHIC polarimeters at any energy above injection

  9. Reviewing operational experience feedback

    International Nuclear Information System (INIS)

    The purpose of this document is to provide detailed supplementary guidance to OSART experts to aid in the evaluation of operational experience feedback (OEF) programmes at nuclear power plants. The document begins by describing the objectives of an OEF programme. It goes on to indicate preparatory work and investigatory guidance for the expert. Section 5 describes attributes of an excellent OEF programme. Appended to these guidelines are examples of OEF documents from various plants. These are intended to help the expert by demonstrating the actual implementation of OEF in practice. These guidelines are in no way intended to conflict with existing national regulations and rules. A comprehensive OEF programme, as described in Section 2, would be impossible to evaluated in detail in the amount of time typically allocated for assessing OEF in an OSART review. The expert must use his or her time wisely by concentrating on those areas that appear to be the weakest

  10. Operational diver monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The requirements of the contract under which this work was performed were simple. It was required that we should bring back sleep and other physiological data from divers in the working environment. This we have done. The two divers studied do not give us sufficient evidence upon which to base conclusive statements, though the rapidity with which a normal sleep pattern was established in both divers suggests to us that operational demand rather than any hyperbaric influence on sleep physiology is the major factor causing fatigue offshore. The temperature work reported is an additional study, not originally contained in the contract. The work was performed in response to a need for information from Oceaneering/Vickers Oceanics and we thank them for the opportunity. This work shows that divers using their system do undoubtably get cold, but that the recently introduced space undersuit provides considerable protection. (UK)

  11. Operator product expansion algebra

    International Nuclear Information System (INIS)

    The Operator Product Expansion (OPE) is a theoretical tool for studying the short distance behaviour of products of local quantum fields. Over the past 40 years, the OPE has not only found widespread computational application in high-energy physics, but, on a more conceptual level, it also encodes fundamental information on algebraic structures underlying quantum field theories. I review new insights into the status and properties of the OPE within Euclidean perturbation theory, addressing in particular the topics of convergence and ''factorisation'' of the expansion. Further, I present a formula for the ''deformation'' of the OPE algebra caused by a quartic interaction. This formula can be used to set up a novel iterative scheme for the perturbative computation of OPE coefficients, based solely on the zeroth order coefficients (and renormalisation conditions) as initial input.

  12. Operation and machine studies

    International Nuclear Information System (INIS)

    This annual report describes the GANIL (Grand accelerateur national d'ions lourds, Caen, France) operation and the machine studies realized in 1992. Metallic ions have been accelerated during 36 pc of the time; some were produced for the first time at GANIL: 125Te, 52Cr with ECR3, 181Ta with ECR4. The various machine studies are: comparison of lifetimes of carbon sheets, charge exchange of very heavy ions in carbon foils and in the residual gas of the Ganil cyclotrons, commissioning of the new high intensity axial injection system for Ganil, tantalum acceleration with the new injector, a cyclotron as a mass spectrometer; other studies concerned: implementing the new control system, gettering flux measurement, energy deposited by neutrons and gamma rays in the cryogenic system of SISSI; latest developments on multicharged ECR ion sources, and an on-line isotopic separator test bench at Ganil

  13. Operating systems. [of computers

    Science.gov (United States)

    Denning, P. J.; Brown, R. L.

    1984-01-01

    A counter operating system creates a hierarchy of levels of abstraction, so that at a given level all details concerning lower levels can be ignored. This hierarchical structure separates functions according to their complexity, characteristic time scale, and level of abstraction. The lowest levels include the system's hardware; concepts associated explicitly with the coordination of multiple tasks appear at intermediate levels, which conduct 'primitive processes'. Software semaphore is the mechanism controlling primitive processes that must be synchronized. At higher levels lie, in rising order, the access to the secondary storage devices of a particular machine, a 'virtual memory' scheme for managing the main and secondary memories, communication between processes by way of a mechanism called a 'pipe', access to external input and output devices, and a hierarchy of directories cataloguing the hardware and software objects to which access must be controlled.

  14. Operation for ensidig recurrensparese

    DEFF Research Database (Denmark)

    Melchiors, Jacob; Rasmussen, Niels

    2009-01-01

    INTRODUCTION: Medialisation surgery for unilateral recurrent nerve paralysis has been performed for the past 100 years to improve voice quality. The aim of this paper is to describe our surgical methods and evaluate the results using subjective and objective parameters with an emphasis on acoustic...... voice analysis. MATERIAL AND METHODS: Retrospective cohort study of 42 consecutively operated patients from 1996 to 2006. Twenty-eight patients were treated with a hydroxyapatite prosthesis, which was inserted into the larynx (VoCom), nine patients had a silicone bead oil injected into the paretic vocal...... fold, and the remaining five received a combination of the mentioned procedures. The subjective evaluation was based on the patient's description of voice quality, while objective quality of the voice was assessed by acoustic voice analysis performed with the Multi-Dimensional Voice Program (MDVP) and...

  15. Enhancing operational nuclear safety

    International Nuclear Information System (INIS)

    's safety standards and program which provides the safety objective following the 10 fundamental safety principles. The safety requirements defines the functional conditions required for safety and the safety guides provides user-friendly and up-to-date practical guidance representing good/best practices to fulfill the requirements. The IAEA provides safety review services and fields safety review teams upon request of member states for the regulatory, the International Regulatory Review Team (IRRT) and Operational Safety Review Team (OSART) and Peer Review of the Operational and Safety Performance Experience Review (PROSPER). The OSART programme's purpose is to assist member states in enhancing the operational safety of individual nuclear power plants and to promote the continuous development of operational safety within all member states by the dissemination of information on good practice. The OSART Mission Results (OSMIR) database contains the results from 73 OSART missions and 54 follow up visits from 1991 and its continually updated. The Asian Nuclear Safety Network (ANSN) was established to pool and share existing and new technical knowledge and practical experience to further improve the safety of nuclear installation in Asia. In summary, the enhancement of the GNSR is anchored in the recognition that all the states are in the same boat and the increasing importance of sharing and mutual learning, sharing knowledge and experience through regional and global networking. It requires joint and coordinated strategy by all states. The IAEA is willing and ready to support the GNSR through the establishment and application of safety standards, and safety review and advisory services and international instruments. (Author)

  16. Reactor operation experience

    International Nuclear Information System (INIS)

    Since the TRIGA Users Conference in Helsinki 1970 the TRIGA reactor Vienna was in operation without any larger undesired shutdown. The integrated thermal power production by August 15 1972 accumulated to 110 MWd. The TRIGA reactor is manly used for training of students, for scientific courses and research work. Cooperation with industry increased in the last two years either in form of research or in performing training courses. Close cooperation is also maintained with the IAEA, samples are irradiated and courses on various fields are arranged. Maintenance work was performed on the heat exchanger and to replace the shim rod magnet. With the view on the future power upgrading nine fuel elements type 110 have been ordered recently. Experiments, performed currently on the reactor are presented in details

  17. Managing sour gas operations

    Energy Technology Data Exchange (ETDEWEB)

    Squarek, J. [Canadian Association of Petroleum Producers, Calgary, AB (Canada)

    2003-07-01

    Sour crudes currently account for 33 per cent of natural gas production in Canada. It is expected that they will account for 40 per cent of production within 10 years and production will be nearer to populated areas. This presentation discussed public safety issues associated with sour gas production and the impact that the Kyoto Protocol may have on emissions reductions, energy efficiency and sulfur recovery. Key issues for Canadian oil and natural gas include competitiveness, access to resources, open access to markets, and environmental/safety performance. The management of sour gas operations in terms of flaring/venting and plume dispersion was discussed along with regulatory updates, emergency response planning, and stakeholder consultations. The impact that revisions to Guide 60 will have have on flaring and venting practices in Alberta was also addressed. The expectations for future demand markets were highlighted with reference to the potential to generate electricity with sour gas. 8 figs.

  18. International operations networks

    CERN Document Server

    Farooq, Sami; Cheng, Yang

    2014-01-01

    Although the area of International Manufacturing Network (IMN) and International Operations Network (ION) has received considerable attention in the literature, most of studies appear multifaceted and interdisciplinary, and thereby require thorough investigation from both academic and practical perspectives, in order to deepen our related understanding. The book seeks advanced contributions that will combine theoretical insights and empirical experience by offering a detailed examination of IMN and, further, ION from various perspectives. This book can be used as a reference material for scholarpractitioners, business executives, and university researchers who need to deepen their understanding on the importance and influence of IMN and ION as well as their development. The book is important because there are few reference/resource materials available related to IMN and ION.

  19. Operations on Soft Graphs

    Directory of Open Access Journals (Sweden)

    Muhammad Akram

    2015-12-01

    Full Text Available Mathematical modelling, analysis and computing of problems with uncertainty is one of the hottest areas in interdisciplinary research involving applied mathematics, computational intelligence and decision sciences. It is worth noting that uncertainty arises from various domains has very different nature and cannot be captured within a single mathematical framework. Molodtsov’s soft sets provide us a new way of coping with uncertainty from the viewpoint of parameterization. In this paper, we introduce the concepts of soft graphs, vertex-induced soft graphs, edge-induced soft graphs and describe some operations on soft graphs by presenting several examples to demonstrate these new concepts. Finally, we investigate some fundamental properties of soft graphs.

  20. Conceptualizing operations strategy processes

    DEFF Research Database (Denmark)

    Rytter, Niels Gorm; Boer, Harry; Koch, Christian

    2007-01-01

    Purpose - The purpose of this paper is to present insights into operations strategy (OS) in practice. It outlines a conceptualization and model of OS processes and, based on findings from an in-depth and longitudinal case study, contributes to further development of extant OS models and methods...... which presently mainly focus on OS content, as distinct from process issues. DesignImethodology/approach - The methodology combines action research and a longitudinal single site case study of OS processes in practice. Findings - The paper conceptualises an OS process as: events of dialogue and action...... provides a useful tool for describing and analyzing real-time OS processes unfolding in practice. Research limitations/implications - The research is based on a single case, which limits the generalizability of the findings. Practical implications - The findings suggest that, in order to obtain successful...

  1. Gulf operations still recovering

    International Nuclear Information System (INIS)

    This paper reports that reports of damage caused by Hurricane Andrew were leveling off last week at the U.S. Minerals Management Service as Gulf of Mexico operators pressed ahead with repairs. The hurricane struck South Florida Aug. 4, churned west into the gulf, then swung north and hit the South Louisiana coast Aug. 5. By the close of business Sept. 8 MMS had received damage reports covering 83 pipeline segments and 193 platforms and satellite installations. MMS last week estimated about 500 MMcfd of gas production had been restored in the gulf and 100,000-150,000 b/d of oil. Production still lost as a result of Andrew was estimated at 2-2.5 bcfd of gas and 90,000-120 b/d of oil. MMS estimates Gulf of Mexico wells before the storm were producing about 12.5-13 bcfd of gas and 750,000 b/d of oil

  2. Operator Structure of TMDs

    CERN Document Server

    Mulders, P J

    2015-01-01

    The focus of this talk is on the transverse components of parton momenta. Like for collinear parton distribution functions (PDFs), we are also in the case of transverse momentum dependent (TMD) PDFs, talking about forward matrix elements. While the collinear PDFs describe only spin-spin correlations, the TMD PDFs (or in short TMDs) include spin-momentum correlations, including also time-reversal-odd (T-odd) correlations. The latter are important in the description of single spin asymmetries. In this way TMDs open up new ways of studying the spin structure of hadrons or they can be used as tools that incorporate hadronic structure also in non-collinear situations. The operator structure of TMDs within QCD, in particular the structure of Wilson lines, is more complex than that for collinear functions leading to various ways of breaking of universality. This breaking of universality, however, can be handled within QCD.

  3. FRMAC Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    Frandsen, K.

    2010-05-01

    In the event of a major radiological incident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities. The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. This manual describes the FRMAC’s response activities in a radiological incident. It also outlines how FRMAC fits in the National Incident Management System (NIMS) under the National Response Framework (NRF) and describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the affected areas. In the event of a potential or existing major radiological incident, the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is responsible for establishing and managing the FRMAC during the initial phases.

  4. KEPLER SCIENCE OPERATIONS

    International Nuclear Information System (INIS)

    Kepler's mission design includes a comprehensive plan for commissioning and science operations. The commissioning phase completed all critical tasks and accomplished all mission objectives within a week of the pre-launch plan. Since the start of science data collection, the nominal timeline has been interrupted by two safe-mode events, several losses of fine point, and some small pointing adjustments. The most important anomalies are understood and mitigated, so Kepler's technical performance has improved significantly over this period, and the prognosis for mission success is excellent. The Kepler data archive is established and hosting data for the science team, guest observers, and the public. The first data to become publicly available include the monthly full-frame images and the light curves for targets that are dropped from the exoplanet program or released after publication. Data are placed in the archive on a quarterly basis; the Kepler Results Catalog will be released annually starting in 2011.

  5. Pyrolaser Operating System

    Science.gov (United States)

    Roberts, Floyd E., III

    1994-01-01

    Software provides for control and acquisition of data from optical pyrometer. There are six individual programs in PYROLASER package. Provides quick and easy way to set up, control, and program standard Pyrolaser. Temperature and emisivity measurements either collected as if Pyrolaser in manual operating mode or displayed on real-time strip charts and stored in standard spreadsheet format for posttest analysis. Shell supplied to allow macros, which are test-specific, added to system easily. Written using Labview software for use on Macintosh-series computers running System 6.0.3 or later, Sun Sparc-series computers running Open-Windows 3.0 or MIT's X Window System (X11R4 or X11R5), and IBM PC or compatible computers running Microsoft Windows 3.1 or later.

  6. Gulf operators resuming production

    International Nuclear Information System (INIS)

    This paper reports that Gulf of Mexico operators last week were gradually restoring production at installations struck by Hurricane Andrew. The Minerals Management Service continued receiving reports of more damage. By the end of the day Sept. 8, MMS had received reports of damage to 83 pipeline segments and 193 platforms and satellite installations. Damage reports listed 112 installations with structural damage, 13 platforms toppled and five leaning, and 30 satellite platforms toppled and 33 leaning. But despite the extent of damage the storm inflicted on oil and gas installations in the gulf, it pales in comparison to the misery and suffering the storm caused in Florida and Louisiana, an oil company official said

  7. Modern operative hysteroscopy.

    Science.gov (United States)

    Centini, Gabriele; Troia, Libera; Lazzeri, Lucia; Petraglia, Felice; Luisi, Stefano

    2016-04-01

    Hysteroscopy is an endoscopic surgical procedure that has become an important tool to evaluate intrauterine pathology. It offers a direct visualization of the entire uterine cavity and provides the possibility of performing biopsy of suspected lesions that can be missed by dilatation and curettage (D&C). In most cases, the intrauterine pathologies can be diagnosed and treated at the same setting as office hysteroscopy ("see and treat approach"). For example, endometrial polyps can be diagnosed and removed; similarly, intrauterine adhesions can be liberated in the outpatient setting without the need for an operating theatre. Today, many hysteroscopic procedures can be performed in the office or outpatient setting. This is due to the feasibility of operative hysteroscopy using saline as a distending medium, the vaginoscopic approach of hysteroscopy and the availability of mini-hysteroscopic endoscopes. There is good evidence to suggest that hysteroscopy in an ambulatory setting is preferable for the patient, and that it avoids complications, allows a quicker recovery time and lowers cost. Advances in technology have led to miniaturization of high-definition hysteroscopes without compromising optical performance, thereby making hysteroscopy a simple, safe and well-tolerated office procedure. The new surgical technology such as bipolar electrosurgery, endometrial ablation devices, hysteroscopic sterilization, and morcellators has revolutionized this surgical modality. The modern development of hysteroscopy completely transformed the approach to the uterine intracavitary pathologies moving from a blind procedure under general anesthesia to an outpatient procedure performed under direct visualization, offering therapeutic and irreplaceable possibilities of treatment that should belong to every modern gynecologist. PMID:26930389

  8. Regulatory and operating experience

    International Nuclear Information System (INIS)

    Regulatory and operating experience in the disposal of radioactive waste can be divided into three time periods, World War II and its aftermath, Post World War II till the end of the cold war, and crystal ball gazing into the future. In the first period, there was little regulatory guidance and operating practices, all conducted under wartime secrecy conditions, sometimes were not even up to the norms of the times. Environmental releases resulted in some seriously contaminated sites and high dosages to some offsite populations. Failure to consider even the storage of wastes in a systems context resulted in some stocks that were difficult to recover, treat and dispose of in a final manner. In the second period, increasing civilian uses of nuclear power and isotopes for medical, research, and industrial purposes and military pressure for increased production of Pu-239 resulted in large and more dispersed disposal of radioactive wastes. Regulatory regimes, following growing environmental consciousness, came into existence that minimized exposure to environmental contamination. Practices, in most instances, increasingly conformed to these regulatory demands. The future is unknowable. However, for high level wastes, except for thermodynamically stable forms, no technology can guarantee safety and present methodologies are calculated to produce doses orders of magnitude lower than regulatory limits. Therefore, it is possible that research will be limited to no higher technology than is reasonably achievable. Whereas for low level waste, where proof is practicably possible, as high technology as is reasonably achievable will be best in the long run. (author). 24 refs, 5 figs, 3 tabs

  9. Fast reactor operating experience

    International Nuclear Information System (INIS)

    At the beginning of electricity generation from nuclear power there was the breeder, which fulfilled its duty in a number of smaller test and experimental reactors within national programs. Over the years, some of those reactors have attained impressive availabilities, while others have helped to improve our knowledge by the negative results they contributed. Worldwide a decisive step was taken by the mid- to late sixties in the planning and construction of medium sized demonstration fast breeder power plants (250 to 350 MW). In the Federal Republik of Germany, this step is taken belatedly in building the SNR-300. BN-350 in the USSR, Phenix in France, and PFR in the United Kingdom have now been in operation for some ten years. Over that period, valuable experience has been accumulated in sodium technology. The operating behavior of all components and systems working in sodium is called excellent; the hazards associated with sodium, the fire hazard in particular, thus often seem to be greatly overrated. Leakages have been brought under control. It has always been possible so far to trace them back to systemic faults produced in the welding process. The ability of fast sodium cooled reactors to produce more nuclear fuel than they consume has been demonstrated in Phenix, whose breeding ration has been measured to be 1.16. The first true large breeder, Super Phenix in France, is to be commissioned already in 1985. In building another three breeder power plants the European partners in an association hope to achieve the commercial breakthrough of the breeder line. (orig.)

  10. Motor-operator gearbox efficiency

    International Nuclear Information System (INIS)

    Researchers at the Idaho National Engineering Laboratory recently conducted tests investigating the operating efficiency of the power train (gearbox) in motor-operators typically used in nuclear power plants to power motor-operated valves. Actual efficiency ratios were determined from in-line measurements of electric motor torque (input to the operator gearbox) and valve stem torque (output from the gearbox) while the operators were subjected to gradually increasing loads until the electric motor stalled. The testing included parametric studies under reduced voltage and elevated temperature conditions. As part of the analysis of the results, we compared efficiency values determined from testing to the values published by the operator manufacturer and typically used by the industry in calculations for estimating motor-operator capabilities. The operators we tested under load ran at efficiencies lower than the running efficiency (typically 50%) published by the operator manufacturer

  11. Motor-operated gearbox efficiency

    Energy Technology Data Exchange (ETDEWEB)

    DeWall, K.G.; Watkins, J.C.; Bramwell, D. [Idaho National Engineering Lab., Idaho Falls, ID (United States); Weidenhamer, G.H.

    1996-12-01

    Researchers at the Idaho National Engineering Laboratory recently conducted tests investigating the operating efficiency of the power train (gearbox) in motor-operators typically used in nuclear power plants to power motor-operated valves. Actual efficiency ratios were determined from in-line measurements of electric motor torque (input to the operator gearbox) and valve stem torque (output from the gearbox) while the operators were subjected to gradually increasing loads until the electric motor stalled. The testing included parametric studies under reduced voltage and elevated temperature conditions. As part of the analysis of the results, the authors compared efficiency values determined from testing to the values published by the operator manufacturer and typically used by the industry in calculations for estimating motor-operator capabilities. The operators they tested under load ran at efficiencies lower than the running efficiency (typically 50%) published by the operator manufacturer.

  12. CxP Medical Operations Concept of Operations (CONOPS)

    Science.gov (United States)

    Scheuring, Richard A.

    2010-01-01

    This slide presentation reviews the planned medical operations for manned missions to the Moon and Mars as outlined in the Constellation program. Many of the issues involving the medical operations are examined.

  13. Operations on soft sets revisited

    CERN Document Server

    Zhu, Ping

    2012-01-01

    Soft sets, as a mathematical tool for dealing with uncertainty, have recently gained considerable attention, including some successful applications in information processing, decision, demand analysis, and forecasting. To construct new soft sets from given soft sets, some operations on soft sets have been proposed. Unfortunately, such operations cannot keep all classical set-theoretic laws true for soft sets. In this paper, we redefine the intersection, complement, and difference of soft sets and investigate the algebraic properties of these operations along with a known union operation. We find that the new operation system on soft sets inherits all basic properties of operations on classical sets, which justifies our definitions.

  14. Operational behaviour of a reactor normal operation and disturbances

    International Nuclear Information System (INIS)

    During normal operation, the following topics are dealt with: primary and secondary coolant circuits - full load operation - start-up and shutdown - steady state part load diagramm. During disturbances and incidents, the following procedures are discussed: identification and detection of the events - automatic actions - manual actions of the operator - provided indications - explanation of actuated systems - basic information of reactor protection system. (RW)

  15. PDX divertor operation

    International Nuclear Information System (INIS)

    PDX was brought into operation in January 1980 as a diverted tokamak with typical parameters of Bsub(T) = 15-20 kG, a = 38 cm, R0 = 123-159 cm, Isub(p) = 180-300 kA, q approx. equal to 3.7, anti nsub(e) = 1-3.8 x 1013 cm-3, anti Z = 1.1-3, tausub(E)sub(e) approx. equal to 25 ms, and pulse lengths up to 0.7 s. Internal vacuum components that were exposed to the plasma (such as limiters, shields, microwave horns, etc.) were fabricated from 99% pure titanium. Glow discharge cleaning with 3 x 10-2 Torr H2 and pulse discharge cleaning were used to condition the vessel for high power discharges. For the divertor studies, work has concentrated on obtaining long, high current stable discharges. Radial position, plasma current, and gas injection control systems have been used to facilitate this effort. Discharges of inside-D, square, and inverse-D cross-section have been produced. Microwave interferometers, spectroscopy, an X-ray pulse height analyzer system, scanning and fixed bolometers, and thermocouple array have been used to determine plasma and impurity densities, temperature, radiation, and power loss to the divertor. A comparison of diverted and undiverted discharges is presented. (orig.)

  16. Operational Dust Prediction

    Science.gov (United States)

    Benedetti, Angela; Baldasano, Jose M.; Basart, Sara; Benincasa, Francesco; Boucher, Olivier; Brooks, Malcolm E.; Chen, Jen-Ping; Colarco, Peter R.; Gong, Sunlin; Huneeus, Nicolas; Jones, Luke; Lu, Sarah; Menut, Laurent; Morcrette, Jean-Jacques; Mulcahy, Jane; Nickovic, Slobodan; Garcia-Pando, Carlos P.; Reid, Jeffrey S.; Sekiyama, Thomas T.; Tanaka, Taichu Y.; Terradellas, Enric; Westphal, Douglas L.; Zhang, Xiao-Ye; Zhou, Chun-Hong

    2014-01-01

    Over the last few years, numerical prediction of dust aerosol concentration has become prominent at several research and operational weather centres due to growing interest from diverse stakeholders, such as solar energy plant managers, health professionals, aviation and military authorities and policymakers. Dust prediction in numerical weather prediction-type models faces a number of challenges owing to the complexity of the system. At the centre of the problem is the vast range of scales required to fully account for all of the physical processes related to dust. Another limiting factor is the paucity of suitable dust observations available for model, evaluation and assimilation. This chapter discusses in detail numerical prediction of dust with examples from systems that are currently providing dust forecasts in near real-time or are part of international efforts to establish daily provision of dust forecasts based on multi-model ensembles. The various models are introduced and described along with an overview on the importance of dust prediction activities and a historical perspective. Assimilation and evaluation aspects in dust prediction are also discussed.

  17. Aircraft Operations Classification System

    Science.gov (United States)

    Harlow, Charles; Zhu, Weihong

    2001-01-01

    Accurate data is important in the aviation planning process. In this project we consider systems for measuring aircraft activity at airports. This would include determining the type of aircraft such as jet, helicopter, single engine, and multiengine propeller. Some of the issues involved in deploying technologies for monitoring aircraft operations are cost, reliability, and accuracy. In addition, the system must be field portable and acceptable at airports. A comparison of technologies was conducted and it was decided that an aircraft monitoring system should be based upon acoustic technology. A multimedia relational database was established for the study. The information contained in the database consists of airport information, runway information, acoustic records, photographic records, a description of the event (takeoff, landing), aircraft type, and environmental information. We extracted features from the time signal and the frequency content of the signal. A multi-layer feed-forward neural network was chosen as the classifier. Training and testing results were obtained. We were able to obtain classification results of over 90 percent for training and testing for takeoff events.

  18. The Bender-Dunne basis operators as Hilbert space operators

    Energy Technology Data Exchange (ETDEWEB)

    Bunao, Joseph; Galapon, Eric A., E-mail: eagalapon@up.edu.ph, E-mail: eric.galapon@upd.edu.ph [Theoretical Physics Group, National Institute of Physics, University of the Philippines, Diliman, Quezon City, 1101 Philippines (Philippines)

    2014-02-15

    The Bender-Dunne basis operators, T{sub −m,n}=2{sup −n}∑{sub k=0}{sup n}(n/k )q{sup k}p{sup −m}q{sup n−k} where q and p are the position and momentum operators, respectively, are formal integral operators in position representation in the entire real line R for positive integers n and m. We show, by explicit construction of a dense domain, that the operators T{sub −m,n}'s are densely defined operators in the Hilbert space L{sup 2}(R)

  19. Operator bosonization on Riemann surfaces: new vertex operators

    International Nuclear Information System (INIS)

    A new formalism is presented for building an operator theory of generalized ghost systems (bc theories of spin J) on Riemann surfaces (loop diagrams of the closed string theory). Operators of the bc system are expressed through the operators of a bosonic conformal theory on a Riemann surface. As distinct from standard bosonization formulas, which have meaning only locally, the Baker-Akhiezer operator functions are introduced which are globally well defined on a Riemann surface of arbitrary form. The operator algebra of Baker-Akhiezer functions generates explicity the algebraic-geometrical τ function and correlation functions of bc systems on Riemann surfaces

  20. Qinshan NPP operating experience feedback

    International Nuclear Information System (INIS)

    The author briefly addresses the composition of internal and external operating experience feedback and its implementation, and the effect to plant operation and management, and ideas on how to improve the experience feedback in the future

  1. Unbounded weighted conditional expectation operators

    OpenAIRE

    Estaremi, Yousef

    2014-01-01

    In this note basic properties of unbounded weighted conditional expectation operators are investigated. A description of polar decomposition and quasinormality in this context are provided. Also, we study hyperexpan- sive weighted conditional expectation operators.

  2. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  3. Computerized Operating Room Information System

    OpenAIRE

    Helsel, Philip; Smith, R. Brian; Albin, Maurice

    1983-01-01

    In order to pursue greater efficiency of overall anesthesia resources and provide a database for operating room (O.R.) utilization, we have developed and implemented a computerized operating room information system (C.O.R.I.S.).

  4. COMPOSITION OPERATORS ON BERGMAN SPACES

    Institute of Scientific and Technical Information of China (English)

    J. H. CLIFFORD; ZHENG DECHAO

    2003-01-01

    The authors obtain function theoretic characterizations of the compactness on the standardweighted Bergman spaces of the two operators formed by multiplying a composition operatorwith the adjoint of another composition operator.

  5. Dynamics of Double Stochastic Operators

    Science.gov (United States)

    Saburov, Mansoor

    2016-03-01

    A double stochastic operator is a generalization of a double stochastic matrix. In this paper, we study the dynamics of double stochastic operators. We give a criterion for a regularity of a double stochastic operator in terms of absences of its periodic points. We provide some examples to insure that, in general, a trajectory of a double stochastic operator may converge to any interior point of the simplex.

  6. Analysis of ROV Lift Operation

    OpenAIRE

    Bjerkholt, Runa Folvik

    2014-01-01

    As a service company performing subsea operations, DeepOcean wishes to operate in the widest range of sea conditions. The majority of all offshore operations are performed using remotely operated vehicles (ROVs), where lifting through the splash zone is considered the most critical phase during launching and recovery of the ROV system. Available standards from DNV propose a systematic and analytical approach for estimating the hydrodynamic loads occurring in the splash zone. A maximum operati...

  7. Energy Efficient Mobile Operating Systems

    OpenAIRE

    Muhammad Waseem

    2013-01-01

    Energy is an important resource in mobile computers now days. It is important to manage energy in efficient manner so that energy consumption will be reduced. Developers of operating system decided to increase the battery life time of mobile phones at operating system level. So, design of energy efficient mobile operating system is the best way to reduce the energy consumption in mobile devices. In this paper, currently used energy efficient mobile operating system is discussed and compared. ...

  8. Operating systems for mobile devices

    OpenAIRE

    Hroch, Jiří

    2012-01-01

    This bachelor thesis is focused on operating systems for mobile devices. The first part is listed first term PC operating system and the most common types of these systems. The operating systems for mobile devices are now chosen the most widely used platforms, which are subsequently described. There is something about their history, development, and are given different versions of these systems.In the second part of this work is compared with popular operating systems today, Android and iOS. ...

  9. Baryonic Operators for Lattice Simulations

    CERN Document Server

    Edwards, R; Fleming, G; Heller, U M; Morningstar, C J; Richards, D; Sato, I; Wallace, S

    2004-01-01

    The construction of baryonic operators for determining the N* excitation spectrum is discussed. The operators are designed with one eye towards maximizing overlaps with the low-lying states of interest, and the other eye towards minimizing the number of sources needed in computing the required quark propagators. Issues related to spin identification are outlined. Although we focus on tri-quark baryon operators, the construction method is applicable to both mesons and penta-quark operators.

  10. Searching publications on operating systems

    OpenAIRE

    Middelburg, C.A.

    2010-01-01

    This note concerns a search for publications in which one can find statements that explain the concept of an operating system, reasons for introducing operating systems, a formalization of the concept of an operating system or theory about operating systems based on such a formalization. It reports on the way in which the search has been carried out and the outcome of the search. The outcome includes not only what the search was meant for, but also some added bonuses.

  11. Unambiguous discrimination among oracle operators

    OpenAIRE

    Chefles, Anthony; Kitagawa, Akira; Takeoka, Masahiro; Sasaki, Masahide; Twamley, Jason

    2007-01-01

    We address the problem of unambiguous discrimination among oracle operators. The general theory of unambiguous discrimination among unitary operators is extended with this application in mind. We prove that entanglement with an ancilla cannot assist any discrimination strategy for commuting unitary operators. We also obtain a simple, practical test for the unambiguous distinguishability of an arbitrary set of unitary operators on a given system. Using this result, we prove that the unambiguou...

  12. 3D GIS spatial operation based on extended Euler operators

    Science.gov (United States)

    Xu, Hongbo; Lu, Guonian; Sheng, Yehua; Zhou, Liangchen; Guo, Fei; Shang, Zuoyan; Wang, Jing

    2008-10-01

    The implementation of 3 dimensions spatial operations, based on certain data structure, has a lack of universality and is not able to treat with non-manifold cases, at present. ISO/DIS 19107 standard just presents the definition of Boolean operators and set operators for topological relationship query, and OGC GeoXACML gives formal definitions for several set functions without implementation detail. Aiming at these problems, based mathematical foundation on cell complex theory, supported by non-manifold data structure and using relevant research in the field of non-manifold geometry modeling for reference, firstly, this paper according to non-manifold Euler-Poincaré formula constructs 6 extended Euler operators and inverse operators to carry out creating, updating and deleting 3D spatial elements, as well as several pairs of supplementary Euler operators to convenient for implementing advanced functions. Secondly, we change topological element operation sequence of Boolean operation and set operation as well as set functions defined in GeoXACML into combination of extended Euler operators, which separates the upper functions and lower data structure. Lastly, we develop underground 3D GIS prototype system, in which practicability and credibility of extended Euler operators faced to 3D GIS presented by this paper are validated.

  13. Synergy, a co-operative innovation for joint operations

    International Nuclear Information System (INIS)

    Industry cooperation in the operation of the large Swan Hills oil field in western Alberta is described. Declining production and increasing costs required innovative approaches to field operation. Traditional operation involved one operator making the majority of decisions with funding controlled by numerous non-operating joint owners, and can suffer from interaction problems due to the inherenty competitive nature of the petroleum industry. The new mode of operation stresses trust, cooperation, teamwork, resource sharing, and continuous improvement. The synergy involves sharing best practices, information, knowledge and expertise, combining resources, and standardizing procedures and specifications. The new mode of operation has resulted in an improved performance of up to 15%. The cooperation lessons learnt at Swan Hills may have broad application across the petroleum industry. 6 refs., 6 figs

  14. Transportation operations functions of the Federal Waste Management System

    International Nuclear Information System (INIS)

    This document discusses the functions that are required to accept the waste, transport the waste, and provide the mandatory support activities. These functions are independent of any organizational structure and reflect a conventional and generally accepted transportation system involving casks; ancillary equipment; truck, rail, and barge transporters; cask and vehicle maintenance facilities; traffic management activities; and other related support system subelements. Where appropriate, the functions are ordered to identify their relationship with each other. This relationship is depicted graphically in functional flow block diagrams (FFBDs). The FFBDs provide a definition of the functions that the systems must perform; a tool to aid in the identification of important issues and trade-off studies; an important method for tracing requirements and decisions back to essential functions; and a basis for allocating the functions, a process that will identify where, how, and by whom they will be performed. 22 refs., 13 figs

  15. 75 FR 61096 - Regulated Navigation Area; Reserved Channel, Boston Harbor, Boston, MA

    Science.gov (United States)

    2010-10-04

    ... of six cranes from the barge CHICAGO BRIDGE to Conley Terminal in South Boston. This rule is intended... entry into the Reserved Channel and control the speed of all vessels transiting within the RNA. The RNA... while the barge CHICAGO BRIDGE conducts crane offload operations at Conley Terminal, Berth 12, for...

  16. Operating Reserves and Variable Generation

    Energy Technology Data Exchange (ETDEWEB)

    Ela, E.; Milligan, M.; Kirby, B.

    2011-08-01

    This report tries to first generalize the requirements of the power system as it relates to the needs of operating reserves. It also includes a survey of operating reserves and how they are managed internationally in system operations today and then how new studies and research are proposing they may be managed in the future with higher penetrations of variable generation.

  17. Path Integral for Quantum Operations

    OpenAIRE

    Tarasov, Vasily E.

    2007-01-01

    In this paper we consider a phase space path integral for general time-dependent quantum operations, not necessarily unitary. We obtain the path integral for a completely positive quantum operation satisfied Lindblad equation (quantum Markovian master equation). We consider the path integral for quantum operation with a simple infinitesimal generator.

  18. Operant Conditioning for Special Educators.

    Science.gov (United States)

    Pedrini, Bonnie C.; Pedrini, D. T.

    The paper briefly explains operant conditioning as it pertains to special educators. Operant conditioning is thought to be an efficient method for modifying student behavior. Using the B. F. Skinner frame of reference, operant conditioning is said to include behavior modification and therapy, programed instruction, and computer assisted and…

  19. Quantum entanglement and quantum operation

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    It is a simple introduction to quantum entanglement and quantum operations. The authors focus on some applications of quantum entanglement and relations between two-qubit entangled states and unitary operations. It includes remote state preparation by using any pure entangled states, nonlocal operation implementation using entangled states, entanglement capacity of two-qubit gates and two-qubit gates construction.

  20. Geometric Operators on Boolean Functions

    DEFF Research Database (Denmark)

    Frisvad, Jeppe Revall; Falster, Peter

    of a few geometric operators working on the images of Boolean functions. The operators we describe, arise from the niche area of array-based logic and have previously been tightly bound to an array-based representation of Boolean functions. We redefine the operators in an abstract form to make them...

  1. Unambiguous discrimination among oracle operators

    Science.gov (United States)

    Chefles, Anthony; Kitagawa, Akira; Takeoka, Masahiro; Sasaki, Masahide; Twamley, Jason

    2007-08-01

    We address the problem of unambiguous discrimination among oracle operators. The general theory of unambiguous discrimination among unitary operators is extended with this application in mind. We prove that entanglement with an ancilla cannot assist any discrimination strategy for commuting unitary operators. We also obtain a simple, practical test for the unambiguous distinguishability of an arbitrary set of unitary operators on a given system. Using this result, we prove that the unambiguous distinguishability criterion is the same for both standard and minimal oracle operators. We then show that, except in certain trivial cases, unambiguous discrimination among all standard oracle operators corresponding to integer functions with fixed domain and range is impossible. However, we find that it is possible to unambiguously discriminate among the Grover oracle operators corresponding to an arbitrarily large unsorted database. The unambiguous distinguishability of standard oracle operators corresponding to totally indistinguishable functions, which possess a strong form of classical indistinguishability, is analysed. We prove that these operators are not unambiguously distinguishable for any finite set of totally indistinguishable functions on a Boolean domain and with arbitrary fixed range. Sets of such functions on a larger domain can have unambiguously distinguishable standard oracle operators, and we provide a complete analysis of the simplest case, that of four functions. We also examine the possibility of unambiguous oracle operator discrimination with multiple parallel calls and investigate an intriguing unitary superoperator transformation between standard and entanglement-assisted minimal oracle operators.

  2. Factorizing the time evolution operator

    International Nuclear Information System (INIS)

    There is a widespread belief in the quantum physical community, and textbooks used to teach quantum mechanics, that it is a difficult task to apply the time evolution operator eitH-hat/h on an initial wavefunction. Because the Hamiltonian operator is, generally, the sum of two operators, then it is not possible to apply the time evolution operator on an initial wavefunction ψ(x, 0), for it implies using terms like (a-hat + b-hat). A possible solution is to factorize the time evolution operator and then apply successively the individual exponential operator on the initial wavefunction. However, the exponential operator does not directly factorize, i.e. ea-hat+b-hat ≠ ea-hat eb-hat. In this study we present a useful procedure for factorizing the time evolution operator when the argument of the exponential is a sum of two operators, which obey specific commutation relations. Then, we apply the exponential operator as an evolution operator for the case of elementary unidimensional potentials, like a particle subject to a constant force and a harmonic oscillator. Also, we discuss an apparent paradox concerning the time evolution operator and non-spreading wave packets addressed previously in the literature

  3. Operant Variability: Some Random Thoughts

    Science.gov (United States)

    Marr, M. Jackson

    2012-01-01

    Barba's (2012) paper is a serious and thoughtful analysis of a vexing problem in behavior analysis: Just what should count as an operant class and how do people know? The slippery issue of a "generalized operant" or functional response class illustrates one aspect of this problem, and "variation" or "novelty" as an operant appears to fall into…

  4. NPD Operating Experience

    International Nuclear Information System (INIS)

    NPD has demonstrated high-capacity factor operation and for the past three years has achieved an average net capacity factor of 98% for the ''winter-peak'' period. The net capacity factor for the year 1966 was 88% and for the period from the end of commissioning (October 1962) to the end of 1966 was 71%. The output of the station has been stretched from 22 MW(e) gross to 25 MW(e) gross. This was aided by the installation of an internal steam separator in the turbine but no basic modifications to the reactor-boiler systems were required. The turbine has also been modified by the installation of chrome steel diaphragms as a solution to an erosion problem. The station also continues as a test facility to develop new components and techniques. This includes the recent successful replacement of two reactor pressure tubes and the conversion of the reactor vault ventilation system to a ''dry'' atmosphere using a molecular sieve to collect heavy-water leakage and control the concentration of acidic oxides of nitrogen. Fuel performance has been excellent and the average burn-up in the core is now 84 MWh/kg U which is slightly above the equilibrium design value. Only three fuel bundles have been found with sheath failures and none of these was due to a deficiency in the fuel but was as a result of handling problems with the refuelling equipment. In spite of undesirably high maintenance time, the fuelling machines have now inserted over 1000 fuel bundles into the reactor ''on power''. Heavy-water loss rates have been acceptable and are improving. The average loss rate from leaks during 1966 was 210 g/h. A proposal to modify the NPD heavy-water heat transport system to allow boiling is under consideration. (author)

  5. LSST operation simulator implementation

    Science.gov (United States)

    Delgado, Francisco; Cook, Kem; Miller, Michelle; Allsman, Robyn; Pierfederici, Francesco

    2006-06-01

    We have developed an operation simulator for the Large Synoptic Survey Telescope (LSST) that is an implementation in Python language using the SimPy extension, with a modular and object-oriented design. The main components include a telescope model, a sky model, a weather database for 3 sites, a scheduler and multiple observing proposals. All the proposals derive from a parent class which is fully configurable through about 75 parameters to implement a specific science survey. These parameters control the target selection region, the composition of the sequence of observations for each field, the timing restrictions and filter selection criteria of each observation, the lunation handling, seeing limits, etc. The current implemented proposals include Weak Lensing, Near Earth Asteroids, Supernova and Kuiper Belt Objects. The telescope model computes the slew time delay from the current position to any given target position, using a complete kinematic model for the mount, dome and rotator, as well as optics alignment corrections. The model is fully configurable through about 50 parameters. The scheduler module combines the information received from the proposals and the telescope model for selecting the best target at each moment, promoting targets that fulfill multiple surveys and storing all the simulator activities in a MySQL database for further analysis of the run. This scheduler is also configurable; for example, balancing the weight of the slew time delay in selecting the next field to observe. This simulator has been very useful in clarifying some of the technical and scientific capabilities of the LSST design, and gives a good baseline for a future observation scheduler.

  6. Infection control in operating theatres.

    Science.gov (United States)

    Al-Benna, Sammy

    2012-10-01

    The operating theatre complex is the heart of any major surgical hospital. Good operating theatre design meets the functional needs of theatre care professionals. Operating theatre design must pay careful consideration to traffic patterns, the number and configuration of nearby operating rooms, the space required for staff, administration and storage, provisions for sterile processing and systems to control airborne contaminants (Wan et al 2011). There have been infection control issues with private finance initiative built operating theatres (Unison 2003, Ontario Health Coalition 2005). The aim of this article is to address these issues as they relate to infection control and prevention. PMID:23162994

  7. TCMS operations and maintenance philosophy

    Science.gov (United States)

    Buehler, David P.; Griffin, Rock E.

    1992-01-01

    The purpose is to describe the basic philosophies of operating and maintaining the Test, Control, and Monitor System (TCMS) equipment. TCMS is a complex and sophisticated checkout system. Operations and maintenance processes developed to support it will be based upon current experience, but will be focused on the specific needs of TCMS in support of Space Station Freedom Program (SSFP) and related activities. An overview of the operations and maintenance goals and philosophies are presented. The assumptions, roles and responsibilities, concepts and interfaces for operation, on-line maintenance, off-line support, and Operations and Maintenance (O&M) personnel training on all TCMS equipment located at KSC are described.

  8. Universal operations in Hochschild homology

    DEFF Research Database (Denmark)

    Wahl, Nathalie

    2015-01-01

    operations is approximated by a certain chain complex of formal operations, for which we provide an explicit model that we can calculate in a number of cases. When E encodes the structure of open topological conformal field theories, we identify this last chain complex, up quasi-isomorphism, with the moduli...... identifies with Sullivan diagrams, thus showing that operations constructed by Tradler-Zeinalian, again by different methods, account for all formal operations. As an illustration of the last result we exhibit two infinite families of non-trivial operations and use these to produce non-trivial higher string...

  9. Accelerator operation management using objects

    International Nuclear Information System (INIS)

    Conflicts over control of shared devices or resources in an accelerator control system, and problems that can occur due to applications performing conflicting operations, are usually resolved by accelerator operators. For these conflicts to be detected by the control system, a model of accelerator operation must be available to the system. The authors present a design for an operation management system addressing the issues of operations management using the language of Object-Oriented Design (OOD). A possible implementation using commercially available software tools is also presented

  10. Invariant operators of inhomogeneous groups

    International Nuclear Information System (INIS)

    The problems concerning the invariant operators of the W(p, q) Weyl group of arbitrary dimension are considered. The Weyl group relative invariants, which do not contain the dilatation operators and which are the absolute invariants of the ISO (p, q) group, are searched for. The invariant operators of the Weyl group are represented in the form of the ratio of the Cazimir operators of the inhomogeneous pseudoorthogonal subgroup. It is shown that all the invariant operators of the W(p, q) Weyl group are rational and their number is [p+q-1/2

  11. Modeling aerial refueling operations

    Science.gov (United States)

    McCoy, Allen B., III

    Aerial Refueling (AR) is the act of offloading fuel from one aircraft (the tanker) to another aircraft (the receiver) in mid flight. Meetings between tanker and receiver aircraft are referred to as AR events and are scheduled to: escort one or more receivers across a large body of water; refuel one or more receivers; or train receiver pilots, tanker pilots, and boom operators. In order to efficiently execute the Aerial Refueling Mission, the Air Mobility Command (AMC) of the United States Air Force (USAF) depends on computer models to help it make tanker basing decisions, plan tanker sorties, schedule aircraft, develop new organizational doctrines, and influence policy. We have worked on three projects that have helped AMC improve its modeling and decision making capabilities. Optimal Flight Planning. Currently Air Mobility simulation and optimization software packages depend on algorithms which iterate over three dimensional fuel flow tables to compute aircraft fuel consumption under changing flight conditions. When a high degree of fidelity is required, these algorithms use a large amount of memory and CPU time. We have modeled the rate of aircraft fuel consumption with respect to AC GrossWeight, Altitude and Airspeed. When implemented, this formula will decrease the amount of memory and CPU time needed to compute sortie fuel costs and cargo capacity values. We have also shown how this formula can be used in optimal control problems to find minimum costs flight plans. Tanker Basing Demand Mismatch Index. Since 1992, AMC has relied on a Tanker Basing/AR Demand Mismatch Index which aggregates tanker capacity and AR demand data into six regions. This index was criticized because there were large gradients along regional boundaries. Meanwhile tankers frequently cross regional boundaries to satisfy the demand for AR support. In response we developed continuous functions to score locations with respect to their proximity to demand for AR support as well as their

  12. Accelerator Operators and Software Development

    International Nuclear Information System (INIS)

    At Thomas Jefferson National Accelerator Facility, accelerator operators perform tasks in their areas of specialization in addition to their machine operations duties. One crucial area in which operators contribute is software development. Operators with programming skills are uniquely qualified to develop certain controls applications because of their expertise in the day-to-day operation of the accelerator. Jefferson Lab is one of the few laboratories that utilizes the skills and knowledge of operators to create software that enhances machine operations. Through the programs written; by operators, Jefferson Lab has improved machine efficiency and beam availability. Because many of these applications involve automation of procedures and need graphical user interfaces, the scripting language Tcl and the Tk toolkit have been adopted. In addition to automation, some operator-developed applications are used for information distribution. For this purpose, several standard web development tools such as perl, VBScript, and ASP are used. Examples of applications written by operators include injector steering, spin angle changes, system status reports, magnet cycling routines, and quantum efficiency measurements. This paper summarizes how the unique knowledge of accelerator operators has contributed to the success of the Jefferson Lab control system. *This work was supported by the U.S. DOE contract No. DE-AC05-84-ER40150

  13. Factorizing the time evolution operator

    CERN Document Server

    Quijas, P C G

    2006-01-01

    There is a widespread belief in the quantum physical community, and in textbooks used to teach Quantum Mechanics, that it is a difficult task to apply the time evolution operator on an initial wave function. That is to say, because the hamiltonian operator generally is the sum of two operators, then it is a difficult task to apply the time evolution operator on an initial wave function, because it implies to apply terms like (A+B)^n. A possible solution of this problem is to factorize the time evolution operator and then apply successively the individual exponential operator on the initial wave function. However, the exponential operator does not directly factorize. In this work we present useful ways to factorizing the time evolution operator when the argument of the exponential is a sum of two operators which obey specific commutation relations. Then, we apply the exponential operator as an evolution operator for the case of elementary unidimensional potentials, like the harmonic oscillator. Also, we argue ...

  14. APPLICATION OF TWO OPERATORS TRANSFORM FROM CLASS A OPERATOR TO THE CLASS OF HYPONORMAL OPERATOR

    Institute of Scientific and Technical Information of China (English)

    Yang Changsen; Ding Yanfeng

    2011-01-01

    In this article, we give an operator transform (∧T)(*) from class A operator to the class of hyponormal operators. It is different from the operator transform (∧T) defined by M.Chō and T. Yamazaki. Then, we show that σ(T) = σ(∧T)(*)) and σa(T)\\{0} = σa(∧T)(*))\\{0},in case T belongs to class A. Next, we obtain some relations between (∧T) and (∧T)(*).

  15. Operator companion for CANDU reactors

    International Nuclear Information System (INIS)

    As CANDU nuclear power plants become more complex, and are operated under tighter constraints and for longer periods between outages, plant operations staff will have to absorb more information to correctly and rapidly respond to upsets. A development program is underway at Atomic Energy of Canada Limited to use expert systems and interactive media tools to assist operations staff of existing and future CANDU plants. The complete system for plant information access and display, on-line advice and diagnosis, and interactive operating procedures is called the Operator Companion. A prototype, consisting of operator consoles, expert systems and simulation modules in a distributed architecture, is currently being developed to demonstrate the concepts of the Operator Companion. (author). 5 refs, 2 figs

  16. A Multiprocessor Operating System Simulator

    Science.gov (United States)

    Johnston, Gary M.; Campbell, Roy H.

    1988-01-01

    This paper describes a multiprocessor operating system simulator that was developed by the authors in the Fall semester of 1987. The simulator was built in response to the need to provide students with an environment in which to build and test operating system concepts as part of the coursework of a third-year undergraduate operating systems course. Written in C++, the simulator uses the co-routine style task package that is distributed with the AT&T C++ Translator to provide a hierarchy of classes that represents a broad range of operating system software and hardware components. The class hierarchy closely follows that of the 'Choices' family of operating systems for loosely- and tightly-coupled multiprocessors. During an operating system course, these classes are refined and specialized by students in homework assignments to facilitate experimentation with different aspects of operating system design and policy decisions. The current implementation runs on the IBM RT PC under 4.3bsd UNIX.

  17. Claims of operators, non-operators and third parties arising from oil and gas operations

    International Nuclear Information System (INIS)

    There has come a resurgence in the number of companies involved in the oil and gas industry seeking protection from their creditors because of the recent weakness in commodity prices. Because most operations in this industry are conducted jointly, a single insolvency can lead to a toppling of other participants in the joint venture and beyond. The problem is to minimize one's losses if other members of the joint venture become insolvent. An examination is included of some remedies which may be available to operators, non-operators and third parties when faced with an insolvent oil and gas participant. The remedies which may be available to the non-operator that is owed moneys by its operator are discussed. The remedies that the operator has against its non-operators, with an emphasis on the nature of the operator's lien and the right of set-off, are described. A brief review is included of some of the remedies that might be available to a third party as against the operators and non-operators. Some s uggestions are included for directors, bankers, third parties, non-operators and operators

  18. Operational circular No. 1 (Rev. 1) – Operational circulars

    CERN Multimedia

    HR Department

    2011-01-01

    Operational Circular No. 1 (Rev. 1) is applicable to members of the personnel and other persons concerned. Operational Circular No. 1 (Rev. 1) entitled "Operational circulars", approved following discussion at the Standing Concertation Committee meeting on 4 May 2011, is available on the intranet site of the Human Resources Department: https://hr-docs.web.cern.ch/hr-docs/opcirc/opcirc.asp It cancels and replaces Operational Circular No. 1 entitled "Operational Circulars” of December 1996. This new version clarifies, in particular, that operational circulars do not necessarily arise from the Staff Rules and Regulations, and the functional titles have been updated to bring them into line with the current CERN organigram. Department Head Office  

  19. Optimum operation cycle of nuclear plant in power system operation

    International Nuclear Information System (INIS)

    Extension of nuclear power plant operation cycle leads to improvement of its capacity factor and affects to suppress thermal plant generation of which fuel cost is relatively high. On the other hand, the number of nuclear fuel assembly to be exchanged at the time of maintenance increases with the operation cycle extension and this makes the fuel cost of nuclear generation high. For this reason, there exists the optimum operation cycle from the power system operation. This report deals with the optimum operation cycle of nuclear plant as the optimum sharing problem of generated energy between nuclear and thermal plants. The incremental fuel cost is considered to find the optimum value. The effects of the generation mix and high burn-up fuel on optimum operation cycle are examined. (author)

  20. Medical supply on contingency military operations: experience from Operation GRITROCK.

    Science.gov (United States)

    Robinson, J P; Reeves, P

    2015-01-01

    Medical supply during military operations has the ability to affect the efficacy of the operation being undertaken, either negatively or positively. An appropriately-managed maritime platform with a robust medical supply chain during transit and on arrival in theatre is the main aim. A secure supply chain will reduce any implications that logistics may have with regard to capability, and negate the effects of deficiencies of short shelf life items occurring over time and during use in high tempo operations. PMID:26867409

  1. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  2. Tables of Products of Tensor Operators and Stevens Operators

    DEFF Research Database (Denmark)

    Lindgård, Per-Anker

    1975-01-01

    Numerical tables of products of tensor (Racah) operators, Rl,m(J), and Stevens operators Olm(J), working within a J-multiplet are given as a function of X=J(J+1). Examples of the use of the tables, such as the calculation of commutation relations and thermal averages are given.......Numerical tables of products of tensor (Racah) operators, Rl,m(J), and Stevens operators Olm(J), working within a J-multiplet are given as a function of X=J(J+1). Examples of the use of the tables, such as the calculation of commutation relations and thermal averages are given....

  3. Condition Monitoring Of Operating Pipelines With Operational Modal Analysis Application

    Directory of Open Access Journals (Sweden)

    Mironov Aleksey

    2015-12-01

    Full Text Available In the petroleum, natural gas and petrochemical industries, great attention is being paid to safety, reliability and maintainability of equipment. There are a number of technologies to monitor, control, and maintain gas, oil, water, and sewer pipelines. The paper focuses on operational modal analysis (OMA application for condition monitoring of operating pipelines. Special focus is on the topicality of OMA for definition of the dynamic features of the pipeline (frequencies and mode shapes in operation. The research was conducted using two operating laboratory models imitated a part of the operating pipeline. The results of finite-element modeling, identification of pipe natural modes and its modification under the influence of virtual failure are discussed. The work considers the results of experimental research of dynamic behavior of the operating pipe models using one of OMA techniques and comparing dynamic properties with the modeled data. The study results demonstrate sensitivity of modal shape parameters to modification of operating pipeline technical state. Two strategies of pipeline repair – with continuously condition-based monitoring with proposed technology and without such monitoring, was discussed. Markov chain reliability models for each strategy were analyzed and reliability improvement factor for proposed technology of monitoring in compare with traditional one was evaluated. It is resumed about ability of operating pipeline condition monitoring by measuring dynamic deformations of the operating pipe and OMA techniques application for dynamic properties extraction.

  4. Operating experience feedback report - Solenoid-operated valve problems

    International Nuclear Information System (INIS)

    This report highlights significant operating events involving observed or potential common-mode failures of solenoid-operated valves (SOVs) in US plants. These events resulted in degradation or malfunction of multiple trains of safety systems as well as of multiple safety systems. On the basis of the evaluation of these events, the Office for Analysis and Evaluation of Operational Data (AEOD) of the US Nuclear Regulatory Commission (NRC) concludes that the problems with solenoid-operated valves are an important issue that needs additional NRC and industry attention. This report also provides AEOD's recommendations for actions to reduce the occurrence of SOV common-mode failures. 115 refs., 7 figs., 2 tabs

  5. From EGEE Operations Portal towards EGI Operations Portal

    Science.gov (United States)

    Cordier, Hélène; L'Orphelin, Cyril; Reynaud, Sylvain; Lequeux, Olivier; Loikkanen, Sinikka; Veyre, Pierre

    Grid operators in EGEE have been using a dedicated dashboard as their central operational tool, stable and scalable for the last 5 years despite continuous upgrade from specifications by users, monitoring tools or data providers. In EGEE-III, recent regionalisation of operations led the Operations Portal developers to conceive a standalone instance of this tool. We will see how the dashboard reorganization paved the way for the re-engineering of the portal itself. The outcome is an easily deployable package customized with relevant information sources and specific decentralized operational requirements. This package is composed of a generic and scalable data access mechanism, Lavoisier; a renowned php framework for configuration flexibility, Symfony and a MySQL database. VO life cycle and operational information, EGEE broadcast and Downtime notifications are next for the major reorganization until all other key features of the Operations Portal are migrated to the framework. Features specifications will be sketched at the same time to adapt to EGI requirements and to upgrade. Future work on feature regionalisation, on new advanced features or strategy planning will be tracked in EGI- Inspire through the Operations Tools Advisory Group, OTAG, where all users, customers and third parties of the Operations Portal are represented from January 2010.

  6. Operation training for renovated JMTR

    International Nuclear Information System (INIS)

    JMTR once stopped its operation in August 2006. The subsequent refurbishment and the repair of the building block affected by the 2011 off the Pacific Coast of Tohoku Earthquake on March 11, 2011 have been completed, and it is preparing for the reoperation. As for the refurbishment of reactor facilities, taking into account the operation for further 20 years after the restart, and from the viewpoints of judging standards (aging deterioration of equipment, importance of safety function, and maintenance experience) for the safety ensuring against aging, the following facilities were replaced: (1) core of nuclear reactor body, (2) measurement and control system facilities, (3) reactor cooling system facilities, (4) emergency evacuation equipment of disposal facilities of gaseous waste, and (5) control facilities. In this remodeling, the operation methods for measurement and control system facilities (process instrumentation, nuclear instrumentation) have been changed. Therefore, regarding the reactor operation after the remodeling, examination was made on the methods to safely and reliably conduct important operations such as the criticality proximity of reactor and output increase, while monitoring the process instrumentation in the same way as before. Based on these examination results, the authors designed an operation manual, and have been performing operation training. This paper takes up the methods for reactor operation procedures that were changed by the refurbishment of the reactor, and summarizes the consideration points on the preparation of the operating manual, problems confirmed by practicing the operation training, and measures against those problems. (A.O.)

  7. Operating Experience at NPP Krsko

    International Nuclear Information System (INIS)

    Systematic analysis of operational experience by assessment of internal and industry events and the feedback of lessons learned is one of the essential activities in the improvement of the operational safety and reliability of the nuclear power plant. At NPP Krsko we have developed a document called ''Operating Experience Assessment Program''. Its purpose is to establish administrative guidance for the processing of operating events including on-site and industry events. Assessment of internal events is based on the following methods: Event and Causal Factor Charting, Change Analysis, Barrier Analysis, MORT (Management Oversight and Risk Tree Analysis) and Human Performance Evaluation. The operating experience group has developed a sophisticated program entitled ''Operating experience tracking system'' (OETS) in response to the need for a more efficient way of processing internal and industry operating experience information. The Operating Experience Tracking System is used to initiate and track operational events including recommended actions follow up. Six screens of the system contain diverse essential information which allows tracking of operational events and enables different kinds of browsing. OETS is a part of the NPP Krsko nuclear network system and can be easily accessed by all plant personnel. (author)

  8. Operator Performance Support System (OPSS)

    Science.gov (United States)

    Conklin, Marlen Z.

    1993-01-01

    In the complex and fast reaction world of military operations, present technologies, combined with tactical situations, have flooded the operator with assorted information that he is expected to process instantly. As technologies progress, this flow of data and information have both guided and overwhelmed the operator. However, the technologies that have confounded many operators today can be used to assist him -- thus the Operator Performance Support Team. In this paper we propose an operator support station that incorporates the elements of Video and Image Databases, productivity Software, Interactive Computer Based Training, Hypertext/Hypermedia Databases, Expert Programs, and Human Factors Engineering. The Operator Performance Support System will provide the operator with an integrating on-line information/knowledge system that will guide expert or novice to correct systems operations. Although the OPSS is being developed for the Navy, the performance of the workforce in today's competitive industry is of major concern. The concepts presented in this paper which address ASW systems software design issues are also directly applicable to industry. the OPSS will propose practical applications in how to more closely align the relationships between technical knowledge and equipment operator performance.

  9. 14 CFR 121.535 - Responsibility for operational control: Flag operations.

    Science.gov (United States)

    2010-01-01

    ...: Flag operations. 121.535 Section 121.535 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.535 Responsibility for operational control: Flag operations. (a) Each certificate...

  10. RA reactor operation, Annex A

    International Nuclear Information System (INIS)

    RA reactor was not operated during 1993, although it has been planned to exchange the complete instrumentation until the end of 1993, and to restart the reactor operation in the first half of 1993. This was not fulfilled because the instrumentation was not delivered until the end of 1993. Since our country is under international sanctions it is not possible to plan when the instrumentation will be delivered and foresee the precise date of reactor start-up. That is why this annex includes the plan of reactor operation for period of nine months starting from from the moment of start-up. It is planned to operate the reactor at 0.02 MW power first three months, to increase the power gradually and reach 3.5 MW after 8 months of operation. It is foreseen to operate the reactor at 4.7 MW from the tenth month on

  11. Organizational environment and operator culture

    International Nuclear Information System (INIS)

    The Nuclear Regulatory Commission has historically reviewed corporate and plant level management and organization against the criteria of NUREG-0800, The Standard Review Plan. These criteria address the organizational structure, management control, lines of authority and communication, the range and level of experience, and the availability of manpower to effectively and safely operate the facility. Now that most nuclear power plants have received their operating licenses, the emphasis for review has shifted to the day-to-day operation of the facilities. Along with this has come greater recognition that hardware and engineering systems, through vitally important, are not the only components needed for safe operation of power plants. The people who run and operate these plants are a vitally important component and are an integral part of the entire system, i.e., machinery does not operate in isolation

  12. Nuclear power plant operator licensing

    International Nuclear Information System (INIS)

    The guide applies to the nuclear power plant operator licensing procedure referred to the section 128 of the Finnish Nuclear Energy Degree. The licensing procedure applies to shift supervisors and those operators of the shift teams of nuclear power plant units who manipulate the controls of nuclear power plants systems in the main control room. The qualification requirements presented in the guide also apply to nuclear safety engineers who work in the main control room and provide support to the shift supervisors, operation engineers who are the immediate superiors of shift supervisors, heads of the operational planning units and simulator instructors. The operator licensing procedure for other nuclear facilities are decided case by case. The requirements for the basic education, work experience and the initial, refresher and complementary training of nuclear power plant operating personnel are presented in the YVL guide 1.7. (2 refs.)

  13. RTNS-II operations guidebook

    International Nuclear Information System (INIS)

    This guidebook is intended to provide training criteria, procedures and guidelines for operation of the RTNS-II neutron sources and ancilliary equipment. Use of this document requires full knowledge of the RTNS-II Facility Safety Procedure (FSP) and any Operational Safety Procedures (OSP) in effect. The RTNS-II FSP defines the hazards which may be encountered at RTNS-II and defines the procedures which must be followed in performing any task including operations. The purpose of this document is to provide a central source of detailed information concerning systems and equipment used in operating the RTNS-II neutron sources on a day-to-day basis. All members of the Operations Group are expected to be familiar with its contents. It is also intended to be used in training new members of the Operations Group

  14. SIRE Operations Concept For Shuttle

    Science.gov (United States)

    Ziegler, Daniel H.

    1981-07-01

    The objective of the Space Infrared (SIRE) Sensor program is to measure LWIR radiation of natural and man made sources in space. Measurements will be used to support development and operation of space based space surveillance systems. This paper describes the planned concept for operating SIRE as a non-deployed payload within the payload bay of the Orbiter. The operations concept is prefaced with an overview of the SIRE system addressing the sensor, space segment, ground segment and supporting elements of the Space Trans-portation System. This is followed by a description of operational concepts and data processing that will be used within the ground segment during flights to plan, command and evaluate SIRE operations. This responsive system provides for inflight evaluation of data and replanning of measurements as necessary to accommodate operational perturbations from the Orbiter and react to unexpected measurement results.

  15. Multi-unit operations considerations

    International Nuclear Information System (INIS)

    Several nuclear weapons programs have or are pursuing the implementation of multi-unit operations for tasks such as disassembly and inspection, and rebuild. A multi-unit operation is interpreted to mean the execution of nuclear explosive operating procedures in a single facility by two separate teams of technicians. The institution of a multi-unit operations program requires careful consideration of the tools, resources, and environment provided to the technicians carrying out the work. Therefore, a systematic approach is necessary to produce safe, secure, and reliable processes. In order to facilitate development of a more comprehensive multi-unit operations program, the current work details categorized issues that should be addressed prior to the implementation of multi-unit operations in a given weapons program. The issues have been organized into the following categories: local organizational conditions, work process flow/material handling/workplace configuration, ambient environmental conditions, documented safety analysis, and training

  16. Introduction to the operational calculus

    CERN Document Server

    Berg, Lothar

    2013-01-01

    Introduction to the Operational Calculus is a translation of ""Einfuhrung in die Operatorenrechnung, Second Edition."" This book deals with Heaviside's interpretation, on the Laplace integral, and on Jan Mikusinki's fundamental work ""Operational Calculus."" Throughout the book, basic algebraic concepts appear as aids to understanding some relevant points of the subject. An important field for research in analysis is asymptotic properties. This text also discusses examples to show the potentialities in applying operational calculus that run beyond ordinary differential equations with constant

  17. Quantum entanglement and quantum operation

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    It is a simple introduction to quantum entanglement and quantum operations.The authors focus on some applications of quantum entanglement and relations between two-qubit entangled states and unitary operations.It includes remote state preparation by using any pure entangled states,nonlocal operation implementation using entangled states,entanglement capacity of two-qubit gates and two-qubit gates construction.

  18. Transforming quantum operations: quantum supermaps

    OpenAIRE

    Chiribella, G.; D'Ariano, G. M.; Perinotti, P.

    2008-01-01

    We introduce the concept of quantum supermap, describing the most general transformation that maps an input quantum operation into an output quantum operation. Since quantum operations include as special cases quantum states, effects, and measurements, quantum supermaps describe all possible transformations between elementary quantum objects (quantum systems as well as quantum devices). After giving the axiomatic definition of supermap, we prove a realization theorem, which shows that any sup...

  19. Psychology of NPP operation safety

    International Nuclear Information System (INIS)

    The book is devoted to psychologic investigations into different aspects of NPP operative personnel activities. The whole set of conditions on which successful and accident-free personnel operation depends, is analysed. Based on original engineering and socio-psychologic investigations complex psychologic support for NPP personnel and a system of training and upkeep of operative personnel skills are developed. The methods proposed have undergone a practical examination and proved their efficiency. 154 refs., 12 figs., 9 tabs

  20. Quayside Operations Planning Under Uncertainty

    OpenAIRE

    Iris, Cagatay; Jin, Jian Gang; Lee, Der-Hong

    2015-01-01

    The quayside operation problem is one of the key components in the management system for a container terminal. This work focuses on three important problems that represent a bottleneck on terminal operations: Berth Allocation Problem (BAP), Quay Crane Assignment and Scheduling Problems (QCASP).The state-of-art models mostly rely on forecasted, deterministic vessel arrivals, and they mostly assume that uniform QC operations is maintained. However, in reality, these parameters are mostly random...