WorldWideScience

Sample records for barge operations

  1. 33 CFR 157.460 - Additional operational requirements for tank barges.

    Science.gov (United States)

    2010-07-01

    ... OF HOMELAND SECURITY (CONTINUED) POLLUTION RULES FOR THE PROTECTION OF THE MARINE ENVIRONMENT... Hulls Carrying Petroleum Oils § 157.460 Additional operational requirements for tank barges. (a...

  2. Entrainment, retention, and transport of freely swimming fish in junction gaps between commercial barges operating on the Illinois Waterway

    Science.gov (United States)

    Davis, Jeremiah J.; Jackson, P. Ryan; Engel, Frank; LeRoy, Jessica Z.; Neeley, Rebecca N.; Finney, Samuel T.; Murphy, Elizabeth A.

    2016-01-01

    Large Electric Dispersal Barriers were constructed in the Chicago Sanitary and Ship Canal (CSSC) to prevent the transfer of invasive fish species between the Mississippi River Basin and the Great Lakes Basin while simultaneously allowing the passage of commercial barge traffic. We investigated the potential for entrainment, retention, and transport of freely swimming fish within large gaps (> 50 m3) created at junction points between barges. Modified mark and capture trials were employed to assess fish entrainment, retention, and transport by barge tows. A multi-beam sonar system enabled estimation of fish abundance within barge junction gaps. Barges were also instrumented with acoustic Doppler velocity meters to map the velocity distribution in the water surrounding the barge and in the gap formed at the junction of two barges. Results indicate that the water inside the gap can move upstream with a barge tow at speeds near the barge tow travel speed. Water within 1 m to the side of the barge junction gaps was observed to move upstream with the barge tow. Observed transverse and vertical water velocities suggest pathways by which fish may potentially be entrained into barge junction gaps. Results of mark and capture trials provide direct evidence that small fish can become entrained by barges, retained within junction gaps, and transported over distances of at least 15.5 km. Fish entrained within the barge junction gap were retained in that space as the barge tow transited through locks and the Electric Dispersal Barriers, which would be expected to impede fish movement upstream.

  3. Reactor system on barge

    International Nuclear Information System (INIS)

    Hayashi, Kingo; Yamada, Nobuyuki

    1987-01-01

    Floating electrical power plants or power plant barges add new dimensions to utility planners and agencies in the world. Intrinsically safe and economical reactors (ISER) employ steel reactor pressure vessels, which significantly reduce the weight as compared with PIUS, and provide siting versatility including barge-mounted plants. In this paper, the outline of power plant barges and barge-mounted ISERs is described. Besides their mobility, power plant barges have the salient advantages such as short delivery time and better quality control due to the outfitting in shipyards. These power plant barges may be temporarily moored or permanently grounded in shallow water at the centers of industrial complexes or the suitable areas adjacent to them, and satisfy the increasing needs for electric power. A cost-effective and technically perfect barge positioning system should be designed to meet the specific requirement for the location and its condition. Offshore siting away from coast may be applicable only to large plants of 1,000 MWe or more, and inshore siting and coastal or river siting are considered for an ISER-200 barge-mounted plant. The system of a barge-mounted ISER plant is discussed in the case of a floating type and the type on a seismic base isolator. (Kako, I.)

  4. 78 FR 53285 - Seagoing Barges

    Science.gov (United States)

    2013-08-29

    ...) exemption, or as a rational business decision meant to facilitate the barge's anticipated near-term use for... 100 gross tons making voyages beyond the statutorily defined Boundary Line.\\1\\ In 1997, the Coast... of ``seagoing barge,'' (``a non- self-propelled vessel of at least 100 gross tons . . . making...

  5. Barge Train Maximum Impact Forces Using Limit States for the Lashings Between Barges

    National Research Council Canada - National Science Library

    Arroyo, Jose R; Ebeling, Robert M

    2005-01-01

    ... on: the mass including hydrodynamic added mass of the barge train, the approach velocity, the approach angle, the barge train moment of inertia, damage sustained by the barge structure, and friction...

  6. A Numerical Method for Computing Barge Impact Forces Based on Ultimate Strength of the Lashings between Barges

    National Research Council Canada - National Science Library

    Arroyo, Jose

    2004-01-01

    ... of the barge train, the approach velocity, the approach angle, the barge train moment of inertia, damage sustained by the barge structure, and friction between the barge and the wall. computation...

  7. Determination of barge impact probabilities for bridge design : [summary].

    Science.gov (United States)

    2016-04-01

    University of Florida researchers developed a revised barge impact probability expression applicable for the design of bridge structures located on Florida waterways. University of Florida researchers obtained barge flotilla traffic data and barge-to...

  8. Perancangan Propeler Self-Propelled Barge

    Directory of Open Access Journals (Sweden)

    Billy Teguh kurniawan

    2013-03-01

    Full Text Available Makalah ini menyampaikan suatu penelitian tentang perancangan propeler yang optimal beserta pemilihan daya mesin yang efisien pada self-propelled barge dengan memperhitungkan besarnya nilai tahanan dari barge tersebut. Dengan penambahan sistem propulsi, diharapkan barge dapat beroperasi dengan lebih efisien dibandingkan saat barge beroperasi menggunakan sistem towing atau ditarik tug boat. Perhitungan tahanan barge dilakukan menggunakan metode Holtrop dan Guldhammer-Harvald sehingga dapat diperhi-tungkan geometri dan jenis propeler yang optimal beserta daya mesin yang efisien untuk barge. Propeler yang dianalisis adalah propeler tipe B-Troost Series, sedangkan variasi yang dilakukan untuk perencanaan propeler pada kajian ini adalah variasi putaran propeler pada rentang antara 310-800 rpm, serta variasi jumlah daun pada rentang tiga, empat, lima, dan enam. Besarnya nilai tahanan self-propelled barge untuk metode Holtrop adalah 105.91 kilonewton, sedangkan hasil per-hitungan dari metode Guldhammer-Harvald didapatkan nilai sebesar 109.14 kilonewton. Tipe propeler yang dipilih setelah dilakukan uji kavitasi adalah tipe Troost Series B4-40, dengan diameter sebesar 2.1 m, efisiensi sebesar 0.421, pitch ratio se-besar 0.591, dengan putaran propeler 400 rpm. Daya mesin yg dibutuhkan barge pada kondisi maksimum (BHPMCR sebesar 1669.5 HP. Dengan mempertimbangkan daya tersebut, maka dipilih mesin jenis Caterpillar tipe Marine 3516B yang mem-punyai daya maksimum sebesar 1285 kilowatt atau 1722.5 horsepower dengan putaran mesin sebesar 1200 rpm

  9. 46 CFR 151.10-1 - Barge hull classifications.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Barge hull classifications. 151.10-1 Section 151.10-1... CARRYING BULK LIQUID HAZARDOUS MATERIAL CARGOES Barge Hull Construction Requirements § 151.10-1 Barge hull classifications. (a) Each barge constructed or converted in conformance with this subpart shall be assigned a hull...

  10. Dredging Operations Technical Support Program: Engineering Design and Environmental Assessment of Dredged Material Overflow from Hydraulically Filled Hopper Barges in Mobile Bay, Alabama

    Science.gov (United States)

    1990-09-01

    turbid estuarine habitats such as Mobile Bay are very tolerant of moderately high concentrations of suspended sediments and thin layers of sediment...GULF OF MEXIC BAYOU 4M 2CAE SI2LTK Fiur 3. DsrbuinoAedmnTyesi oie a fo IsphordingLT anCLmb190 PART III: DREDGING EQUIPMENT AND OPERATIONAL TECHNIQUES...increase in ambient turbidity was noted. Water samples were collected at surface, middepth, and bottom. The sampling boats proceeded across their

  11. A mixed integer linear programming model applied in barge planning for Omya

    Directory of Open Access Journals (Sweden)

    David Bredström

    2015-12-01

    Full Text Available This article presents a mathematical model for barge transport planning on the river Rhine, which is part of a decision support system (DSS recently taken into use by the Swiss company Omya. The system is operated by Omya’s regional office in Cologne, Germany, responsible for distribution planning at the regional distribution center (RDC in Moerdijk, the Netherlands. The distribution planning is a vital part of supply chain management of Omya’s production of Norwegian high quality calcium carbonate slurry, supplied to European paper manufacturers. The DSS operates within a vendor managed inventory (VMI setting, where the customer inventories are monitored by Omya, who decides upon the refilling days and quantities delivered by barges. The barge planning problem falls into the category of inventory routing problems (IRP and is further characterized with multiple products, heterogeneous fleet with availability restrictions (the fleet is owned by third party, vehicle compartments, dependency of barge capacity on water-level, multiple customer visits, bounded customer inventories and rolling planning horizon. There are additional modelling details which had to be considered to make it possible to employ the model in practice at a sufficient level of detail. To the best of our knowledge, we have not been able to find similar models covering all these aspects in barge planning. This article presents the developed mixed-integer programming model and discusses practical experience with its solution. Briefly, it also puts the model into the context of the entire business case of value chain optimization in Omya.

  12. The 1988 Drought, Barges, and Diversion.

    Science.gov (United States)

    Changnon, Stanley A.

    1989-09-01

    The drought of 1988 rated as one of the nation's worst in the past 100 years, resulting in a myriad of impacts and responses. A notable, largely unexpected impact involved stoppages of barge traffic on the lower Mississippi River during June and July, a result of shallow areas produced by record low flows and shoaling. The barge industry hauls 45% of all bulk commodities (grains, coal, petroleum) shipped in the central United States. The low flows were a result of the unusually large areas extent of drought conditions across most of the Mississippi Basin, which comprises 40% of the continental United States. Most 1987 months had been relatively warm and dry, minimizing moisture in the soils and shallow ground water. Then deficient snowmelt (due to low winter snow-falls) and record low spring 1988 precipitation combined to produce the record low flows along much of the Mississippi River.Most responses to the drought came in a crisis mode and included concentrated dredging to open channels, government enforced reductions in barge loads and in numbers of barges per tow, tripled barge shipping rates, and shifts in transportation modes. The barge industry suffered a 20% income loss. The total losses to the barge industry coupled with higher costs for shipping were $1 billion. The Illinois Central Railroad, which parallels the major blocked waterways, used a climate prediction to anticipate the low flows 3 months in advance. They leased additional cars to help handle the increased shipments transferred from barges and made a sizable profit. A response proposed by Illinois and shippers-a temporary increase in the water diverted from lake Michigan to raise the levels on the lower Mississippi River-was met with strong objections by other lake states and Canada. The federal government declined the proposal, but the sizable controversy it engendered reflects the growing sensitivity to water resources issues in the Great Lakes Basin and is also illustrative of problems to be

  13. Coupled Responses of Sewol, Twin Barges and Slings During Salvage

    Science.gov (United States)

    Yao, Zong; Wang, Wei-ping; Jiang, Yan; Chen, Shi-hai

    2018-04-01

    Korean Sewol is successfully lifted up with the strand jack system based on twin barges. During the salvage operation, two barges and Sewol encounter offshore environmental conditions of wave, current and wind. It is inevitable that the relative motions among the three bodies are coupled with the sling tensions, which may cause big dynamic loads for the lifting system. During the project engineering phase and the site operation, it is necessary to build up a simulation model that can precisely generate the coupled responses in order to define a suitable weather window and monitor risks for the salvage operation. A special method for calculating multibody coupled responses is introduced into Sewol salvage project. Each body's hydrodynamic force and moment in multibody configuration is calculated in the way that one body is treated as freely moving in space, while other bodies are set as fixed globally. The hydrodynamic force and moment are then applied into a numerical simulation model with some calibration coefficients being inserted. These coefficients are calibrated with the model test results. The simulation model built up this way can predict coupled responses with the similar accuracy as the model test and full scale measurement, and particularly generate multibody shielding effects. Site measured responses and the responses only resulted from from the simulation keep project management simultaneously to judge risks of each salvage stage, which are important for success of Sewol salvage.

  14. From automatic control of vessels designed to operate in offshore conditions to automatic control of a large barge convoy in a river/channel: lessons learned; Do controle automatico de embarcacoes projetadas para condicoes operacionais de offshore para o controle automatico de um grande comboio de barcacas em um rio/canal: licoes aprendidas

    Energy Technology Data Exchange (ETDEWEB)

    Pontes, Anselmo Carvalho [Symmetry Ltda., Rio de Janeiro, RJ (Brazil); Santos, Edson Mesquita do [Marinha do Brasil, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    The waterway transportation sector, despite its problems and bottlenecks, is continually seeking alternatives to improve its operations. With goals of increased efficiency, safety and cost reduction, the sector is modernizing and acquiring new technology. The Dynamic Position control system for a large barge convoy is one of the new technology highlights. This innovation may make development in the Brazilian waterway transportation sector feasible by permitting navigational safety and greater flexibility in transport and distribution not only for mined products but for petroleum and its derivatives. This paper presents the development process of The Dynamic Position control system for a large barge convoy in the Parana-Paraguay River, for Rio Tinto Mining Company. The hydrodynamics effects in a river are quite different than those of the traditional offshore environment. The degree of difficulty involved in solving this problem is highly dependent on a ship's characteristics, which can be analyzed in function of their hydrodynamic coefficients. Model tests in towing tanks were made to adjust the hydrodynamic coefficients and characteristics of the thrusters. The choice of the 'backstepping' control law and observer (state estimator) presented in this paper is a result of these particular conditions. The authors point out the advantage of using this technique, since all the properties of the coefficients of the hull, propeller(s) and thruster(s) have already been tested and tuned and are able to make a reliable set-up that optimizes navigation in restricted waterways. (author)

  15. 76 FR 20080 - Inventory of U.S.-Flag Launch Barges

    Science.gov (United States)

    2011-04-11

    ... Administration publish a notice in the Federal Register requesting that owners or operators (or potential owners... DEPARTMENT OF TRANSPORTATION Maritime Administration [Docket Number MARAD 2011 0030] Inventory of U.S.-Flag Launch Barges AGENCY: Maritime Administration, Department of Transportation. ACTION...

  16. Balanced and sparse Tamo-Barg codes

    KAUST Repository

    Halbawi, Wael

    2017-08-29

    We construct balanced and sparse generator matrices for Tamo and Barg\\'s Locally Recoverable Codes (LRCs). More specifically, for a cyclic Tamo-Barg code of length n, dimension k and locality r, we show how to deterministically construct a generator matrix where the number of nonzeros in any two columns differs by at most one, and where the weight of every row is d + r - 1, where d is the minimum distance of the code. Since LRCs are designed mainly for distributed storage systems, the results presented in this work provide a computationally balanced and efficient encoding scheme for these codes. The balanced property ensures that the computational effort exerted by any storage node is essentially the same, whilst the sparse property ensures that this effort is minimal. The work presented in this paper extends a similar result previously established for Reed-Solomon (RS) codes, where it is now known that any cyclic RS code possesses a generator matrix that is balanced as described, but is sparsest, meaning that each row has d nonzeros.

  17. 78 FR 56612 - Seagoing Barges

    Science.gov (United States)

    2013-09-13

    ... the crew. (C) Fishing vessels not engaged in ocean or coastwise service. Such vessels may carry... ocean or coastwise service may carry persons on the legitimate business of the vessel \\6\\ in addition to... columns 3 and 6. that would (B) Carry more than operating or otherwise be 12 passengers when navigating...

  18. Intermodal Barge Transport : Network Design, Nodes and Competitiveness

    NARCIS (Netherlands)

    Konings, J.W.

    2009-01-01

    The thesis addresses the opportunities and conditions to increase the market share of intermodal barge transport in Northwest Europe. In particular, it focuses on strategies to improve the performances of the different links of the intermodal transport chain: the barge transport services, the

  19. Barge mounter ISER [intrinsically safe and economical reactor

    International Nuclear Information System (INIS)

    Kuwahara, Shin-ichi

    1985-01-01

    A forum in Japan has developed a new nuclear power plant ISER, a modified version of PIUS. ISER employs a conventional steel pressure vessel instead of PCRV used in the PIUS, thus allows the barge-mounted plant. This document introduces the concept of the barge-mounted ISER with its construction and siting

  20. Balanced and sparse Tamo-Barg codes

    KAUST Repository

    Halbawi, Wael; Duursma, Iwan; Dau, Hoang; Hassibi, Babak

    2017-01-01

    We construct balanced and sparse generator matrices for Tamo and Barg's Locally Recoverable Codes (LRCs). More specifically, for a cyclic Tamo-Barg code of length n, dimension k and locality r, we show how to deterministically construct a generator matrix where the number of nonzeros in any two columns differs by at most one, and where the weight of every row is d + r - 1, where d is the minimum distance of the code. Since LRCs are designed mainly for distributed storage systems, the results presented in this work provide a computationally balanced and efficient encoding scheme for these codes. The balanced property ensures that the computational effort exerted by any storage node is essentially the same, whilst the sparse property ensures that this effort is minimal. The work presented in this paper extends a similar result previously established for Reed-Solomon (RS) codes, where it is now known that any cyclic RS code possesses a generator matrix that is balanced as described, but is sparsest, meaning that each row has d nonzeros.

  1. 33 CFR 207.640 - Sacramento Deep Water Ship Channel Barge Lock and Approach Canals; use, administration, and...

    Science.gov (United States)

    2010-07-01

    ... damage by their operations to the lock or other structures. They must use great care not to strike any.... All tow lines or hawsers must be hauled as short as practicable for safe handling of tows. (15) Crew... sufficient number of men to handle lines in mooring craft and to move barges and other craft into and out of...

  2. Effectiveness of a Barge-Based Ballast Water Treatment System for Multi-Terminal Ports

    Directory of Open Access Journals (Sweden)

    Lovro Maglić

    2015-10-01

    Full Text Available The paper presents outcomes of the discrete event simulation of the ballast water management in a multi-terminal port. The simulation includes ship’s manoeuvring, cargo and ballast operations and a barge-based ballast water treatment system operating within all terminal areas. The barge-based ballast water treatment system is used by ships unable to use their own equipment, not equipped with an appropriate ballast treatment system or non-compliant with the Ballast Water Management (BWM Convention 2004 for whatever reason. The main goal is to estimate the productivity and cost effectiveness of such systems as an option to support ships not able to comply with the BWM Convention, once it enters into force. The model was built and tested in Arena simulation software. Process parameters are based on real traffic data for the port of Rijeka. The results indicate that barge-based ballast treatment facility will be heavily underutilized, and that such systems are cost-effective only in ports where large volumes of ballast water need to be delivered to shore treatment systems.

  3. Potential barge transportation for inbound corn and grain

    Science.gov (United States)

    1997-12-31

    This research develops a model for estimating future barge and rail rates for decision making. The Box-Jenkins and the Regression Analysis with ARIMA errors forecasting methods were used to develop appropriate models for determining future rates. A s...

  4. Design of 100 MW LNG Floating Barge Power Plant

    Directory of Open Access Journals (Sweden)

    I Made Ariana

    2017-06-01

    Full Text Available Floating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research, the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulation floating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research, the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulation Normal 0 false false false EN-US X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin:0in; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;}

  5. Barged/In-river steelhead migrant data - Evaluation of methods to reduce straying rates of barged juvenile steelhead

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The goals of this study are to develop methods to reduce wandering and straying of steelhead (Oncorhynchus mykiss) that are collected and barged from the Snake River...

  6. An Advanced Control Technique for Floating Offshore Wind Turbines Based on More Compact Barge Platforms

    Directory of Open Access Journals (Sweden)

    Joannes Olondriz

    2018-05-01

    Full Text Available Hydrodynamic Floating Offshore Wind Turbine (FOWT platform specifications are typically dominated by seaworthiness and maximum operating platform-pitch angle-related requirements. However, such specifications directly impact the challenge posed by an FOWT in terms of control design. The conventional FOWT systems are typically based on large, heavy floating platforms, which are less likely to suffer from the negative damping effect caused by the excessive coupling between blade-pitch control and platform-pitch motion. An advanced control technique is presented here to increase system stability for barge type platforms. Such a technique mitigates platform-pitch motions and improves the generator speed regulation, while maintaining blade-pitch activity and reducing blade and tower loads. The NREL’s 5MW + ITI Energy barge reference model is taken as a basis for this work. Furthermore, the capabilities of the proposed controller for performing with a more compact and less hydrodynamically stable barge platform is analysed, with encouraging results.

  7. A static analysis method for barge impact design of bridges with consideration of dynamic amplification : summary.

    Science.gov (United States)

    2009-11-01

    Several hundred Florida bridges span waterways deep enough for barge traffic. To ensure a bridge is capable of withstanding the potential impact of a barge collision, engineers use design specifications recommended by the American Association of Stat...

  8. Which future for conventional pipeline laying barges?; Quel avenir pour les barges de pose de pipelines conventionnelles ?

    Energy Technology Data Exchange (ETDEWEB)

    Borelli, A.; Perinet, D. [ETPM International (International organizations without location)

    1997-05-01

    The aim of this paper is to study the evolution of conventional pipeline laying barges. The past and todays capacities of some barges are presented in order to follow the evolution of their equipments with time to answer the market needs. The second part outlines the main characteristics of todays market needs. Different analyses are made according to the different means of pipeline laying: conventional, flexible pipes and rigid pipes using unrolling technique. Market trends in these 3 domains show a sensible growth from 1996 to 1997 and are assumed to keep a sustained level during the following years. However, the tendency shows an evolution towards smaller diameter pipes and greater depths. The last part concerns the evolution of laying barges. The most important improvements in pipeline laying industry concern the dynamic positioning, the laying techniques (`S` laying technique), and the rate of laying using real-time control techniques. (J.S.)

  9. 46 CFR 32.63-5 - Barge hull classifications-B/ALL.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Barge hull classifications-B/ALL. 32.63-5 Section 32.63..., AND HULL REQUIREMENTS Hull and Cargo Tank Requirements for Tank Barges Constructed or Converted On or After July 1, 1964, and Carrying Certain Dangerous Bulk Cargoes § 32.63-5 Barge hull classifications—B...

  10. The thermal analysis of BR-100: A barge/rail nuclear spent fuel transportation container

    International Nuclear Information System (INIS)

    Copsey, A.B.

    1992-01-01

    B ampersand W Fuel Company is designing a spent-fuel container called BR-100 that can be used for either barge or rail transport. This paper presents the thermal design and analysis. Both normal operation and hypothetical accident thermal transient conditions are evaluated. The BR-100 cask has a concrete layer than contains free water. During a hypothetical accident, the free water vaporizes and flows from the cask, removing a significant amount of thermal transient energy. The BR-100 transportation package meets the thermal requirements of 10CFR71. It additionally offers substantial margins to established material temperature limits

  11. Recovery of the Irving Whale oil barge: overflights with the laser environmental airborne fluorosensor

    International Nuclear Information System (INIS)

    Brown, C. E.; Nelson, R. D.; Fingas, M.

    1997-01-01

    Contribution of Environment Canada's laser environmental airborne fluorosensor (LEAF) to the recovery in 1996 of the oil barge 'Irving Whale' from the St. Lawrence River was described. Additional equipment employed on board the DC-3 aircraft included an RC-10 colour mapping camera and two down-looking video cameras. Leaking of Bunker C fuel oil was detected around the sunken barge in the days immediately prior to and during the day of the raising of the vessel. During each overflight, the LEAF system produced timely, concise map-based contamination information in hard copy form. The LEAF system also detected extremely thin, sub-sheen levels of oil on the day of the lift over the majority of the southern Gulf of St. Lawrence. The extent of coverage was greatly reduced by the next day and essentially eliminated by the second day after the lift. The LEAF system continued to monitor the 'Irving Whale' as it was transported to Halifax on the deck of the submersible vessel Boabarge 10. There was no evidence of oil leakage during the transit attributable to the 'Irving Whale'. During the entire period of lift and recovery the LEAF system performed flawlessly, and demonstrated the usefulness of remote sensing flights during oil spill response operations. 3 refs., 4 figs

  12. Oysters as biomonitors of the apex barge oil spill

    International Nuclear Information System (INIS)

    Wade, T.L.; Jackson, T.J.; McDonald, T.J.; Wilkinson, D.L.; Brooks, J.M.

    1993-01-01

    The collision of the Greek tanker ship Shinoussa resulted in a spill of an estimated 692,000 gallons of catalytic feed stock oil into Galveston Bay on July 28, 1990. Oysters were collected from Galveston Bay Todds Dump (GBTD) 235 days previous to the spill and 6, 37, 132, and 495 days after the spill. Oysters were also collected from Galveston Bay Redfish Island (GBRI), a site known to be impacted by the spill, 37 and 110 days after the spill. The concentration of the 24 polynuclear aromatic hydrocarbons (PAH) measured for the National Oceanic and Atmospheric Administration's national status and trends program (NS ampersand T) site showed a sharp increase from about 100 ng/g to over 600 ng/g one week after the spill compared to concentrations 235 days previous to the spill. The concentration of the 24 NS ampersand T PAH in oysters from GBRI ranges from 400 to over 1000 ng/g. Soon after the spill the concentration of the 24 NS ampersand T PAH at Todds Dump decreased to levels not statistically different from prespill samples. However, analyses of alkylated and sulfur containing aromatic compounds indicate the oysters were still contaminated with Apex barge oil at least 37 and 110 days after the spill at GBTD and GBRI, respectively. Data from NS ampersand T sampling at GBTD more than a year after the spill (495 days) indicates the presence of alkylated aromatic hydrocarbons that may be from Apex barge oil still in the area. It appears that a sink of Apex barge oil (i.e., in sediments) may periodically be released by storms or other events into the ecosystem near GBTD. Therefore, bioavailable Apex barge oil is still present and may adversely affect oysters 495 days after the spill

  13. Barge loading facilities in conjunction with wood chipping and sawlog mill, Tennessee River Mile 145. 9R: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    1990-08-01

    The purpose of this Environmental Assessment (EA) is to evaluate the environmental consequences of approving, denying, or adopting reasonable alternatives to a request for barge loading facilities. These facilities would serve a proposed wood chipping and sawlog products operation at Tennessee River Mile (TRM) 145.9, right descending bank, (Kentucky Lake), in Perry County, Tennessee. The site is located between Short Creek and Peters Landing. The applicant is Southeastern Forest Products, L.P. (SFP), Box 73, Linden, Tennessee and the proposed facilities would be constructed on or adjacent to company owned land. Portions of the barge terminal would be constructed on land over which flood easement rights are held by the United States of America and administered by the Tennessee Valley Authority (TVA). The US Army Corps of Engineers (CE) and TVA have regulatory control over the proposed barge terminal facilities since the action would involve construction in the Tennessee River which is a navigable water of the United States. The wood chipping and sawlog products facilities proposed on the upland property are not regulated by the CE or TVA. On the basis of the analysis which follows, it has been determined that a modified proposal (as described herein) would not significantly affect the quality of the human environment, and does not require the preparation of an environmental impact statement. 8 refs.

  14. Submergible barge retrievable storage and permanent disposal system for radioactive waste

    Science.gov (United States)

    Goldsberry, Fred L.; Cawley, William E.

    1981-01-01

    A submergible barge and process for submerging and storing radioactive waste material along a seabed. A submergible barge receives individual packages of radwaste within segregated cells. The cells are formed integrally within the barge, preferably surrounded by reinforced concrete. The cells are individually sealed by a concrete decking and by concrete hatch covers. Seawater may be vented into the cells for cooling, through an integral vent arrangement. The vent ducts may be attached to pumps when the barge is bouyant. The ducts are also arranged to promote passive ventilation of the cells when the barge is submerged. Packages of the radwaste are loaded into individual cells within the barge. The cells are then sealed and the barge is towed to the designated disposal-storage site. There, the individual cells are flooded and the barge will begin descent controlled by a powered submarine control device to the seabed storage site. The submerged barge will rest on the seabed permanently or until recovered by a submarine control device.

  15. 75 FR 13645 - Inventory of U.S.-Flag Launch Barges

    Science.gov (United States)

    2010-03-22

    ... Qualified Launch Barges, the Interim Final Rule requires that the Maritime Administration publish a notice... DEPARTMENT OF TRANSPORTATION Maritime Administration [Docket No. MARAD-2010 0023] Inventory of U.S.-Flag Launch Barges AGENCY: Maritime Administration, Department of Transportation. ACTION: Inventory of...

  16. 33 CFR 163.05 - Tows of seagoing barges within inland waters.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Tows of seagoing barges within inland waters. 163.05 Section 163.05 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... inland waters. (a) The tows of seagoing barges when navigating the inland waters of the United States...

  17. 49 CFR 176.174 - Transport of Class 1 (explosive) materials in shipborne barges.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Transport of Class 1 (explosive) materials in... REGULATIONS CARRIAGE BY VESSEL Detailed Requirements for Class 1 (Explosive) Materials Cargo Transport Units and Shipborne Barges § 176.174 Transport of Class 1 (explosive) materials in shipborne barges. (a...

  18. 46 CFR 13.301 - Original application for “Tankerman-PIC (Barge)” endorsement.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Original application for âTankerman-PIC (Barge)â endorsement. 13.301 Section 13.301 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE....301 Original application for “Tankerman-PIC (Barge)” endorsement. Each applicant for a “Tankerman-PIC...

  19. Using service-time profiles for distributed planning of container barge rotations along terminals

    NARCIS (Netherlands)

    Douma, A.M.; Schuur, Peter; Schutten, Johannes M.J.

    2008-01-01

    We consider the barge rotation planning and quay scheduling problem in the Port of Rotterdam. This problem concerns the alignment of barge rotations and terminal quay schedules. We use a Multi-Agent based approach for the problem, since such a Multi-Agent based system can mirror to a large extent

  20. Design features of SMART for barge mounted application

    International Nuclear Information System (INIS)

    Doo-Jeong Lee; Ju-Hyeon Yoon; Ju-Pyung Kim; Jong-In Kim; Moon-Hee Chang

    2000-01-01

    SMART is an integral reactor of 330 MWt capacity with passive safety features being developed for a wide range of applications including the barge mounted co-generation plant. Its design strives to combine the firmly-established commercial reactor design with new advanced technologies. Thus the use of the industry proven KOFA (Korea Optimized Fuel Assembly) based nuclear fuels is pursued while such radically new technologies as self-pressurizing pressurizer, helical once-through steam generators, and advanced control concepts are being developed. The safety of SMART centers around enhancing the inherent safety characteristics of the reactor and salient features include low core power density, integral arrangement to eliminate large break loss of coolant accident, etc. The progression of emergency situations into accidents is prevented with a number of advanced engineered safety features such as Passive Residual Heat Removal System, Passive Emergency Core Cooling System, Safeguard Vessel, Passive Containment Over-pressure Protection. This paper presents the status of current SMART development, characteristics of SMART safety systems and the possibility of SMART application to barge mounted environment. (author)

  1. Flat Top Barge 300 feet Using Portable Dynamic Positioning System

    Directory of Open Access Journals (Sweden)

    Agoes Santoso

    2017-03-01

    Full Text Available Portable Dynamic Positioning System has not commonly applied to the ship, especially on barge. Besides for Dynamic Positioning function, the system can be used as ship's main propulsion. By using this system, the ship able to not using anchors because the functions can be performed by the Portable Dynamic System. Therefore, research about the application of Portable Dynamic Positioning System on the ship is conducted. This research aims to design a Flat Top Barge 300feet ship, to determine the specifications of Portable Dynamic Positioning System which is used, and to find out the ship stability which is designed on the empty payload condition and maximum payload. This research designed the ships with main dimensions LWL 90.1 meters, 25 meters wide, 5.5 meters high and 4.2 meters draught. To generate the ship with a maximum speed of 8 knots, it takes four thruster supplied with power 225 kW each, so that the total generated power is 1100 kW. This study analyzes three conditions of the ship stability, there are the condition of full payload, empty payload, and maximum payload. Each payload conditions will be analyzed regarding the large payload and draught water produced. The first is full payload conditions resulting payload in the amount of 5650 ton with a draught on the LCF at 4,181 meters. The second is the large empty payload condition displacement is 2809 ton and water draught on the LCF at 1,591. And the last is maximum payload conditions, resulting payload in the amount of 7450 ton with a draught on the LCF at 4,994 meters.

  2. Market Anatomy of a Drought: Modeling Barge and Corn Market Adaptation to Reduced Rainfall and Low Mississippi River Water Levels During the 2012 Midwestern U.S. Drought

    Science.gov (United States)

    Foster, B.; Characklis, G. W.; Thurman, W. N.

    2015-12-01

    for keeping shipping channels open during drought, the results of this work should help them to decide how different interventions might benefit or hurt barge operators and/or corn sellers.

  3. Jovian Vortices and Barges: HST observations 1994-1998

    Science.gov (United States)

    Morales, R.; Sanchez-Lavega, A.; Lecacheux, J.; Colas, F.; Miyazaki, I.

    2000-10-01

    We have used the HST-WFPC2 archived images of Jupiter in the period 1994-1998 to study the zonal and meridional distributions, long-term motions, lifetimes, interactions and other properties of the vortices larger than 2 degrees. The latitude range covered spans from +75 to -75 degrees. High-resolution images obtained with the 890nm, 410nm and 953nm wavelength filters allowed us to make a morphological classification based on their appearance in each filter. The vortices are anticyclones, and their long-term motions have been completed with ground-based images and are compared to the mean Jovian zonal wind profile. Significant differences are found between the vortex velocities and the mean zonal winds. Some vortices exhibited important drift changes in short period times. We analyze a possible correlation between their size and zonal wind velocity. On the other hand, the "barges" lie in the cyclone domains of the wind-profile and have been identified in several latitudes. Their latitudinal size is similar in all of them (typically 1.6 degrees) but their longitudinal size ranges from 1 to 32 degrees. We discuss the temporal evolution of some of these cyclonic regions. The Spanish team was supported by Gobierno Vasco PI 034/97. The French team was supported by the "Programme National de Planetologie." RM acknowledges a fellowship from Universidad Pais Vasco.

  4. Nizhny Novgorod Belyana barge in the XIX century

    Directory of Open Access Journals (Sweden)

    Philippov Yury V.

    2015-01-01

    Full Text Available The article discusses a unique Belyana barge, which was built in the Nizhny Novgorod region for several centuries. Belyana as a type of vessels was designed for transportation of logs, sleepers, beams, planks and other forest products from the Upper to the Lower Volga. Originally, the center of Belyana construction was the village of Baki, which was situated on the Vetluga River, a tributary of the Volga River. The Belyana construction technique spread from the Vetluga river banks further to Nizhny Novgorod, and then to Perm region. Almost all aspects of Belyana construction starting from the logging finishing with its floating to the lower Volga, and also cost of transported products in the prices of the XIX century are disclosed. Due to Belyana is truly a popular invention, it was built by traditional methods, relying solely on the centuries-old experience. Any drawings for the construction never existed, that’s why the author relied on preserved photographs and drawings in the historical reconstruction of this unique vessel. At the beginning of the article a brief overview of the geographical location of Nizhny Novgorod, as well as the names of wooden ships which were sailing on Volga and its tributaries in the same times with Belyana are given. At the end of the article practical recommendations on possible reconstruction of Belyana and using it as an interactive museum of ethnography are given.

  5. The structures of colour string for e+e- → qq-barg and υ → 3g

    International Nuclear Information System (INIS)

    Tian Lili; Xie Qubing; Si Zongguo

    1993-01-01

    In Lund model, the explanation of e + e - → qq-barg → 3 jets and υ → 3g → h's is based on applying Lund string fragmentation model to their assumed structures of colour string for qq-barg and 3g systems. In this paper, starting from the colour wave functions of qq-barg and 3 g systems, we study these colour string structures by QCD directly. The results reveal the reasonableness and accuracy of Lund string pictures

  6. Coupled Loads Analysis of the Modified NASA Barge Pegasus and Space Launch System Hardware

    Science.gov (United States)

    Knight, J. Brent

    2015-01-01

    A Coupled Loads Analysis (CLA) has been performed for barge transport of Space Launch System hardware on the recently modified NASA barge Pegasus. The barge re-design was facilitated with detailed finite element analyses by the ARMY Corps of Engineers - Marine Design Center. The Finite Element Model (FEM) utilized in the design was also used in the subject CLA. The Pegasus FEM and CLA results are presented as well as a comparison of the analysis process to that of a payload being transported to space via the Space Shuttle. Discussion of the dynamic forcing functions is included as well. The process of performing a dynamic CLA of NASA hardware during marine transport is thought to be a first and can likely support minimization of undue conservatism.

  7. Preliminary assessment of costs and risks of transporting spent fuel by barge

    International Nuclear Information System (INIS)

    Tobin, R.L.; Meshkov, N.K.; Jones, R.H.

    1985-12-01

    The purpose of this study is to analyze the costs and risks associated with transporting spent fuel by barge. The barge movements would be made in combination with rail movements to transport spent fuel from plants to a repository. For the purpose of this analysis, three candidate repository sites are analyzed: Yucca Mountain, Nevada, Deaf Smith, Texas, and Hanford, Washington. This report complements a report prepared by Sandia National Laboratories in 1984 that analyzes the costs and risks of transporting spent fuel by rail and by truck to nine candidate repository sites

  8. A decision support system tool for the transportation by barge of import containers : A case study

    NARCIS (Netherlands)

    Fazi, Stefano; Fransoo, Jan C.; Van Woensel, Tom

    2015-01-01

    In this paper, we present a DSS that generates schedules for the transportation of containers by barge in the hinterland, in particular from sea terminals to an inland terminal. As a case study, we propose the transportation from the ports of Rotterdam and Antwerp to a terminal in the south of the

  9. 7 CFR 800.97 - Weighing grain in containers, land carriers, barges, and shiplots.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Weighing grain in containers, land carriers, barges... (Continued) GRAIN INSPECTION, PACKERS AND STOCKYARD ADMINISTRATION (FEDERAL GRAIN INSPECTION SERVICE), DEPARTMENT OF AGRICULTURE GENERAL REGULATIONS Weighing Provisions and Procedures § 800.97 Weighing grain in...

  10. Heave motion prediction of a large barge in random seas by using artificial neural network

    Science.gov (United States)

    Lee, Hsiu Eik; Liew, Mohd Shahir; Zawawi, Noor Amila Wan Abdullah; Toloue, Iraj

    2017-11-01

    This paper describes the development of a multi-layer feed forward artificial neural network (ANN) to predict rigid heave body motions of a large catenary moored barge subjected to multi-directional irregular waves. The barge is idealized as a rigid plate of finite draft with planar dimensions 160m (length) and 100m (width) which is held on station using a six point chain catenary mooring in 50m water depth. Hydroelastic effects are neglected from the physical model as the chief intent of this study is focused on large plate rigid body hydrodynamics modelling using ANN. Even with this assumption, the computational requirements for time domain coupled hydrodynamic simulations of a moored floating body is considerably costly, particularly if a large number of simulations are required such as in the case of response based design (RBD) methods. As an alternative to time consuming numerical hydrodynamics, a regression-type ANN model has been developed for efficient prediction of the barge's heave responses to random waves from various directions. It was determined that a network comprising of 3 input features, 2 hidden layers with 5 neurons each and 1 output was sufficient to produce acceptable predictions within 0.02 mean squared error. By benchmarking results from the ANN with those generated by a fully coupled dynamic model in OrcaFlex, it is demonstrated that the ANN is capable of predicting the barge's heave responses with acceptable accuracy.

  11. 77 FR 24840 - Safety Zone; Crowley Barge 750-2, Bayou Casotte, Pascagoula, MS

    Science.gov (United States)

    2012-04-26

    ... its possible commercial and contractual obligations. Under 5 U.S.C. 553(d)(3), the Coast Guard finds... process would unnecessarily interfere with launching the barge and its possible commercial and contractual obligations. Basis and Purpose VT-Halter Pascagoula is a ship yard and repair facility located on Bayou...

  12. A static analysis method for barge-impact design of bridges with consideration of dynamic amplification : final report, November 2009.

    Science.gov (United States)

    2009-11-01

    Current practice with regard to designing bridge structures to resist impact loads associated with barge collisions relies upon the : use of the American Association of State Highway and Transportation Officials (AASHTO) bridge design specifications....

  13. Laboratory data on Snake River steelhead - Evaluation of methods to reduce straying rates of barged juvenile steelhead

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The goals of this study are to develop methods to reduce wandering and straying of steelhead (Oncorhynchus mykiss) that are collected and barged from the Snake River...

  14. Multiple-Criteria Decision-Making in the Design of Innovative Lock Walls for Barge Impact; Phase 1

    National Research Council Canada - National Science Library

    Lambert, James

    2001-01-01

    .... This research project consists of two phases: Phase 1, which culminates with this report, investigated the use of multiple-criteria decision-making in the design process of lock approach walls to consider barge impact and earthquake loads...

  15. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility.

    Energy Technology Data Exchange (ETDEWEB)

    Pratt, Joseph William [Sandia National Lab. (SNL-CA), Livermore, CA (United States); Harris, Aaron P. [Sandia National Lab. (SNL-CA), Livermore, CA (United States)

    2013-01-01

    A barge-mounted hydrogen-fueled proton exchange membrane (PEM) fuel cell system has the potential to reduce emissions and fossil fuel use of maritime vessels in and around ports. This study determines the technical feasibility of this concept and examines specific options on the U.S. West Coast for deployment practicality and potential for commercialization.The conceptual design of the system is found to be straightforward and technically feasible in several configurations corresponding to various power levels and run times.The most technically viable and commercially attractive deployment options were found to be powering container ships at berth at the Port of Tacoma and/or Seattle, powering tugs at anchorage near the Port of Oakland, and powering refrigerated containers on-board Hawaiian inter-island transport barges. Other attractive demonstration options were found at the Port of Seattle, the Suisun Bay Reserve Fleet, the California Maritime Academy, and an excursion vessel on the Ohio River.

  16. 33 CFR 165.830 - Regulated Navigation Area; Reporting Requirements for Barges Loaded with Certain Dangerous...

    Science.gov (United States)

    2010-07-01

    ... either by telephone to (866) 442-6089, by fax to (866) 442-6107, or by e-mail to [email protected] A reporting form and e-mail link are available at http://www.uscg.mil/d8/Divs/M/IRVMC.htm. (5) The general... used to move, transport, or deliver a CDC barge within a fleeting area. Inland River Vessel Movement...

  17. 33 CFR 165.921 - Regulated Navigation Area; Reporting Requirements for Barges Loaded with Certain Dangerous...

    Science.gov (United States)

    2010-07-01

    ... either by telephone to (866) 442-6089, by fax to (866) 442-6107, or by e-mail to [email protected] A reporting form and e-mail link are available at http://www.uscg.mil/d8/Divs/M/IRVMC.htm. (5) The general... size vessel that is used to move, transport, or deliver a CDC barge within a fleeting area. Fleeting...

  18. Babcock and Wilcox BR-100 100-ton rail/barge spent fuel shipping cask

    International Nuclear Information System (INIS)

    1990-02-01

    This Preliminary Design Report (PDR) provides a detailed description of the design, analyses, and testing programs for the BR-100 cask. The BR-100 is a Type B(U) cask designed for transport by rail or barge. This report presents the preliminary analyses and tests which have been performed for the BR-100 and outlines the confirmatory analyses and tests which will be performed

  19. Time Domain Response Analysis of Barge Floater Supporting an Offshore Wind Turbine

    Directory of Open Access Journals (Sweden)

    A.C. Mayilvahanan

    2011-12-01

    Full Text Available Wind energy is a reliable source of sustainable power generation and has been an active area of research globally to economically harness the energy for human use. Reliable source of wind energy pushed the engineers to install wind turbines near and far off the coasts. In shallow water upto 100 m, fixed structures like tripods, jackets, monopiles and gravity base are functionally and economically feasible. In deep waters, a floating substructure can be more economical for offshore wind turbine. In this study a barge type floater of different aspect ratios from 0.4 to 1.0 is investigated for its performance under wave and wind loading. All these floaters were designed with a defined transverse metacentric height (GM equal to 1.0 m and the hydrodynamic analysis is carried out using WAMIT. The barge with aspect ratio B/L = 1.0 is found to have lowest pitch RAO. The time domain surge, heave and pitch response for this barge has been obtained using Integro-differential equation of motion and the statistical response characteristics are compared for two different cases of excitation namely, wave excitation alone and combined wave and wind excitation. Statistics of surge, heave and pitch responses are obtained for three different seas states and for two different wave heading angles.

  20. Preliminary Computational Fluid Dynamics (CFD) Simulation of EIIB Push Barge in Shallow Water

    Science.gov (United States)

    Beneš, Petr; Kollárik, Róbert

    2011-12-01

    This study presents preliminary CFD simulation of EIIb push barge in inland conditions using CFD software Ansys Fluent. The RANSE (Reynolds Averaged Navier-Stokes Equation) methods are used for the viscosity solution of turbulent flow around the ship hull. Different RANSE methods are used for the comparison of their results in ship resistance calculations, for selecting the appropriate and removing inappropriate methods. This study further familiarizes on the creation of geometrical model which considers exact water depth to vessel draft ratio in shallow water conditions, grid generation, setting mathematical model in Fluent and evaluation of the simulations results.

  1. Oyster polynuclear aromatic hydrocarbon fingerprinting applied to the Apex barge oil spill

    International Nuclear Information System (INIS)

    Wade, T.L.; Jackson, T.J.; McDonald, T.J.; Sericano, J.L.; Brooks, J.M.

    1993-01-01

    An estimated 692,000 gallons of catalytic feed stock oil was spilled into Galveston Bay on July 28, 1990, when a tanker collided with three Apex barges in the Houston Ship Channel. Oysters were collected and analyzed from Galveston Bay Todd's Dump (GBRD) before the spill and after the spill. Oysters were also collected from Galveston Bay Redfish Island (GBRI), a site known to be impacted by the spill, 37 and 110 days after the spill. The spilled oil was also analyzed. The concentration of 18 polynuclear aromatic hydrocarbons (PAH) measured as part of the National Oceanic and Atmospheric Administration's National Status ampersand Trends (NS ampersand T) showed a sharp increase from 100 ng/g to over 600 ng/g. Concentrations of these 18 PAHs were also found at GBRI. Fingerprinting techniques applied to data from oyster analyses demonstrated the presence of bioavailable Apex Barge oil 37, 110, and 132 days after the spill at GHTD and GBRI. Fingerprinting becomes less diagnostic with time due to possible environmental weathering of the oil. The fingerprint from GBTD 495 and 851 days after the spill will be presented and discussed

  2. Advanced marine reactor MRX and application to nuclear barge supplying electricity and heat

    International Nuclear Information System (INIS)

    Ishida, Toshihisa; Kusunoki, Tsuyoshi; Odano, Naoteru; Yoritsune, Tsutomu; Fukuhara, Yoshifumi; Ochiai, Masa-aki

    2000-01-01

    The basic design concept of an advanced marine reactor MRX has been established with adoption of several new technologies. The MRX is an integral-type PWR with 100 MWt aimed basically for use of ship propulsion. Adoption of a water-filled containment together with the integral type reactor makes the reactor light-weight and compact greatly. A engineered safety system is a simplified passive system, function of which is confirmed by the safety analysis. The MRX can be applied to an energy supply system of electricity and heat co-generation by installing it on a barge. Concept of a nuclear barge with the MRX of 334 MWt output is presented for use of supplying electricity, fresh water and hot water. Combined system of electric generation and desalination with the RO process can deliver variable output of electricity and fresh water according a demand. Latent heat of the exhausted steam from the turbine can be used effectively to raise the temperature of cold water as heat supply. (author)

  3. Baseline Environmental Analysis Report for the K-1251 Barge Facility at the East Tennessee Technology Park, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Van Winkle J.E.

    2007-08-24

    This report documents the baseline environmental conditions of the U. S. Department of Energy's (DOE's) K-1251 Barge Facility, which is located at the East Tennessee Technology Park (ETTP). DOE is proposing to lease the facility to the Community Reuse Organization of East Tennessee (CROET). This report provides supporting information for the use, by a potential lessee, of government-owned facilities at ETTP. This report is based upon the requirements of Sect. 120(h) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The lease footprint is slightly over 1 acre. The majority of the lease footprint is defined by a perimeter fence that surrounds a gravel-covered area with a small concrete pad within it. Also included is a gravel drive with locked gates at each end that extends on the east side to South First Avenue, providing access to the facility. The facility is located along the Clinch River and an inlet of the river that forms its southern boundary. To the east, west, and north, the lease footprint is surrounded by DOE property. Preparation of this report included the review of government records, title documents, historic aerial photos, visual and physical inspections of the property and adjacent properties, and interviews with current and former employees involved in the operations on the real property to identify any areas on the property where hazardous substances and petroleum products or their derivatives and acutely hazardous wastes were known to have been released or disposed. Radiological surveys were conducted and chemical samples were collected to assess the facility's condition.

  4. 75 FR 78928 - Limited Service Domestic Voyage Load Lines for River Barges on Lake Michigan, Delay of Effective...

    Science.gov (United States)

    2010-12-17

    ...-AA17 Limited Service Domestic Voyage Load Lines for River Barges on Lake Michigan, Delay of Effective Date AGENCY: Coast Guard, DHS. ACTION: Notice of delay of effective date and reopening of the comment... 46 CFR part 45 as amended by the final rule published in the November 18, 2010, Federal Register (75...

  5. Use of Infrasound for evaluating potentially hazardous conditions for barge transit on the Mississippi River at Vicksburg, Mississippi

    Science.gov (United States)

    McKenna, M. H.; Simpson, C. P.; Jordan, A. M.

    2017-12-01

    Navigating the Mississippi River in Vicksburg, MS is known to be difficult for barge traffic in even the best of conditions due to the river's sharp bend 2 km north of the Highway 80 Bridge. When river levels rise, the level of difficulty in piloting barges under the bridge rises. Ongoing studies by the U.S. Army Engineer Research and Development Center (ERDC) are investigating infrasound as a means to correlate the low frequency acoustics generated by the river with the presence of hazardous conditions observed during flood stage, i.e., rough waters and high currents, which may lead to barge-bridge impacts. The Denied Area Monitoring and Exploitation of Structures (DAMES) Array at the ERDC Vicksburg, MS campus is a persistent seismic-acoustic array used for structural monitoring and explosive event detection. The DAMES Array is located 4.3 km from the Mississippi River/Highway 80 Bridge junction and recorded impulsive sub-audible acoustic signals, similar to an explosive event, from barge-bridge collisions that occurred between 2011 and 2017. This study focuses on five collisions that occurred during January 2016, which resulted in closing the river for barge transit and the Highway 80 Bridge for rail transit for multiple days until safety inspections were completed. The Highway 80 Bridge in Vicksburg, MS is the only freight-crossing over the Mississippi River between Baton Rouge, LA and Memphis, TN, meaning delays from these closings have significant impacts on all transit of goods throughout the Southeastern United States. River basin data and regional meteorological data have been analyzed to find correlations between the river conditions in January 2016, and recorded infrasound data with the aim of determining the likelihood that hazardous conditions are present on the river. Frequency-wavenumber analysis was used to identify the transient signals associated with the barge-bridge impacts and calculate the backazimuth to their source. Then, with the use of

  6. PHAEOPIGMENT CONCENTRATION, PHYTOPLANKTON - WET WEIGHT and other data from BARGE from 1975-05-01 to 1975-07-01 (NCEI Accession 7600377)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Water depth and other data from the BARGE from 01 May 1975 to 01 July 1975. Data were collected by the Skidway Institute of Oceanography (SKIO) as part of the...

  7. Effects of barge traffic on distribution and survival of ichthyoplankton and small fishes in the upper Mississippi River

    Science.gov (United States)

    Holland, L.E.

    1986-01-01

    Short-term impacts of commercial barge traffic on fish eggs, larvae, young-of-the-year (age-0) fishes, and small adults in the main channel of the upper Mississippi River were examined. Barge passages caused significant changes in the distribution of eggs and larvae in the study area. The mean catch of ichthyoplankton was reduced in both surface and bottom waters for 90 min after passage of vessels downstream. The effects of upstream traffic on catch ranged from nil in surface or bottom samples to short-term increases in surface samples immediately after passage. No consistent effect on the catch of age-0 or small adult fishes in surface or bottom trawls was evident.

  8. Preliminary technical and economic viability for the implantation of fluvial transport of CNG (Compressed Natural Gas) for barges in Amazon Region; Avaliacao preliminar de viabilidade tecnico-economica para implantacao de transporte fluvial de GNC (Gas Natual Comprimido) por barcacas na Regiao Amazonica

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Marcos C.C. de; Porto, Paulo L. Lemgruber [Interocean Engenharia e Ship Management, Rio de janeiro, RJ (Brazil); Cunha, Rafael H. da [Metro Rio, RJ (Brazil); Garcia, Rafael M. [Pic Brasil (Brazil); Almeida, Marco A.R. de [Universidade Gama Filho (UGF), Rio de Janeiro, RJ (Brazil)

    2004-07-01

    The isolated regions of the Amazon present difficulties for integration with the electrical system which is creating some economic problems due to the consequent costs of electric generation of subsidies as a function of the fossil fuel use as oils diesel and fuel. A viable option is the use of Natural Gas - NG that is Also available in the region. Its modal of transport possible in the Region North they are for gas-lines or barges. The Compressed Natural Gas transport is distinguished that - CNG for barges was still not tested operationally in Brazil. Soon, to develop a Preliminary Study of Viability Technician - Economic - SVTE for the implantation of fluvial transport of CNG between the cities of Coari and Manaus is basic, therefore it is created strategical alternative for the electric generation in this region. The electric sector, the characteristics of the NG and the transport in this region had been analyzed to support to the work. The gas line and the fluvial transport of CNG for barges in this region are not conflicting, and they in a complementary form can act. The SVTE presented a Liquid Present Value and Internal Tax of very attractive Return justifying its implantation. (author)

  9. Investigation of the hydrodynamic model test of forced rolling for a barge using PIV

    Directory of Open Access Journals (Sweden)

    WANG Xiaoqiang

    2017-03-01

    Full Text Available In order to study the physical details of viscous flow in ship roll motions and improve the accuracy of ship roll damping numerical simulation, the application of the Particle Image Velocimetry (PIV technique is investigated in model tests of forced ship rolling in calm water. The hydrodynamic force and flow field at the bilge region are simultaneously measured for barges at different amplitudes and frequencies in which the self-made forced rolling facility was used. In the model test, the viscous flow variation with the time around the bilge region was studied during ship rolling motion. The changes in ship roll damping coefficients with the rolling amplitude and period were also investigated. A comparison of the model test results with the Computational Fluid Dynamics(CFDresults shows that the numerical ship roll damping coefficients agree well with the model test results, while the differences in the local flow details exist between the CFD results and model test results. Further research into the model test technique and CFD application is required.

  10. Nonlinear roll damping of a barge with and without liquid cargo in spherical tanks

    Directory of Open Access Journals (Sweden)

    Wenhua Zhao

    2016-01-01

    Full Text Available Damping plays a significant role on the maximum amplitude of a vessel's roll motion, in particular near the resonant frequency. It is a common practice to predict roll damping using a linear radiation–diffraction code and add that to a linearized viscous damping component, which can be obtained through empirical, semi-empirical equations or free decay tests in calm water. However, it is evident that the viscous roll damping is nonlinear with roll velocity and amplitude. Nonlinear liquid cargo motions inside cargo tanks also contribute to roll damping, which when ignored impedes the accurate prediction of maximum roll motions. In this study, a series of free decay model tests is conducted on a barge-like vessel with two spherical tanks, which allows a better understanding of the nonlinear roll damping components considering the effects of the liquid cargo motion. To examine the effects of the cargo motion on the damping levels, a nonlinear model is adopted to calculate the damping coefficients. The liquid cargo motion is observed to affect both the linear and the quadratic components of the roll damping. The flow memory effect on the roll damping is also studied. The nonlinear damping coefficients of the vessel with liquid cargo motions in spherical tanks are obtained, which are expected to contribute in configurations involving spherical tanks.

  11. The multi-task barge: a floating deep-sea production, storage and unloading unit, with surface production heads and drilling installations; La barge multifonctions: une unite flottante de production, de stockage et dechargement en eau profonde, avec tetes de production en surface et installations de forage

    Energy Technology Data Exchange (ETDEWEB)

    Valenchon, C; Rossig, J H [Bouygues Offshore (France); Pouget, G [Sedco-Forex (France); Biolley, F [Institut Francais du Petrole, 92 - Rueil-Malmaison (France)

    1998-05-01

    The multi-task barge is devoted to the exploitation of deep-sea fields in rather good conditions. It has been designed to bring together within a single installation, a production, storage and unloading unit and the necessary means for the drilling, the connecting and the work-over of wells. Thus submarine well-heads and well-head platforms are no longer needed. When the field configuration or the use of oriented drillings allows to group several wells together, the multi-task platform allows to use more economical surface production heads installed on steel rigid risers. This concept requires less investments thanks to less expensive drilling operations and restricted submarine installations, and to easier well operations and lower exploitation costs. Crude oil storage is ensured to up to about 2 millions of barrels. This paper presents the design aspects and the dynamical analysis of risers with the methods used. The tensioning and mooring system is examined and the advantages of the cylindrical float system is underlined and compared to the classical hydro-pneumatic systems. (J.S.) 11 refs.

  12. An inter-laboratory trial of the unified BARGE bioaccessibility method for arsenic, cadmium and lead in soil

    International Nuclear Information System (INIS)

    Wragg, Joanna; Cave, Mark; Basta, Nick; Brandon, Esther; Casteel, Stan; Denys, Sebastien; Gron, Christian; Oomen, Agnes; Reimer, Kenneth; Tack, Karine; Van de Wiele, Tom

    2011-01-01

    The Bioaccessibility Research Group of Europe (BARGE) has carried out an inter-laboratory trial of a proposed harmonised in vitro physiologically based ingestion bioaccessibility procedure for soils, called the Unified BARGE Method (UBM). The UBM includes an initial saliva phase and simulated stomach and intestine compartments. The trial involved the participation of seven laboratories (five European and two North American) providing bioaccessibility data for As (11 samples), Cd (9 samples) and Pb (13 samples) using soils with in vivo relative bioavailability data measured using a swine model. The results of the study were compared with benchmark criteria for assessing the suitability of the UBM to provide data for human health risk assessments. Mine waste and slag soils containing high concentrations of As caused problems of poor repeatability and reproducibility which were alleviated when the samples were run at lower soil to solution ratios. The study showed that the UBM met the benchmark criteria for both the stomach and stomach and intestine phase for As. For Cd, three out of four criteria were met for the stomach phase but only one for the stomach and intestine phase. For Pb two, out of four criteria were met for the stomach phase and none for the stomach and intestine phase. However, the study recommends tighter control of pH in the stomach phase extraction to improve between-laboratory variability, more reproducible in vivo validation data and that a follow up inter-laboratory trial should be carried out.

  13. An inter-laboratory trial of the unified BARGE bioaccessibility method for arsenic, cadmium and lead in soil

    Energy Technology Data Exchange (ETDEWEB)

    Wragg, Joanna [British Geological Survey, Nottingham (United Kingdom); Cave, Mark, E-mail: mrca@bgs.ac.uk [British Geological Survey, Nottingham (United Kingdom); Basta, Nick [School of Environment and Natural Resources, Ohio State University, Columbus, OH, 43210-1085 (United States); Brandon, Esther [National Institute for Public Health and the Environment, Bilthoven (Netherlands); Casteel, Stan [College of Veterinary Medicine, University of Missouri, 65205 (United States); Denys, Sebastien [INERIS, Parc Technologique Alata, Verneuil-en-Halatte (France); Gron, Christian [DHI Water Environment Health, Horsholm (Denmark); Oomen, Agnes [National Institute for Public Health and the Environment, Bilthoven (Netherlands); Reimer, Kenneth [Environmental Sciences Group, Royal Military College of Canada, Kingston, Ontario (Canada); Tack, Karine [INERIS, Parc Technologique Alata, Verneuil-en-Halatte (France); Van de Wiele, Tom [Laboratory of Microbial Ecology and Technology, University of Ghent, Ghent (Belgium)

    2011-09-01

    The Bioaccessibility Research Group of Europe (BARGE) has carried out an inter-laboratory trial of a proposed harmonised in vitro physiologically based ingestion bioaccessibility procedure for soils, called the Unified BARGE Method (UBM). The UBM includes an initial saliva phase and simulated stomach and intestine compartments. The trial involved the participation of seven laboratories (five European and two North American) providing bioaccessibility data for As (11 samples), Cd (9 samples) and Pb (13 samples) using soils with in vivo relative bioavailability data measured using a swine model. The results of the study were compared with benchmark criteria for assessing the suitability of the UBM to provide data for human health risk assessments. Mine waste and slag soils containing high concentrations of As caused problems of poor repeatability and reproducibility which were alleviated when the samples were run at lower soil to solution ratios. The study showed that the UBM met the benchmark criteria for both the stomach and stomach and intestine phase for As. For Cd, three out of four criteria were met for the stomach phase but only one for the stomach and intestine phase. For Pb two, out of four criteria were met for the stomach phase and none for the stomach and intestine phase. However, the study recommends tighter control of pH in the stomach phase extraction to improve between-laboratory variability, more reproducible in vivo validation data and that a follow up inter-laboratory trial should be carried out.

  14. Interface for Barge-in Free Spoken Dialogue System Based on Sound Field Reproduction and Microphone Array

    Directory of Open Access Journals (Sweden)

    Hinamoto Yoichi

    2007-01-01

    Full Text Available A barge-in free spoken dialogue interface using sound field control and microphone array is proposed. In the conventional spoken dialogue system using an acoustic echo canceller, it is indispensable to estimate a room transfer function, especially when the transfer function is changed by various interferences. However, the estimation is difficult when the user and the system speak simultaneously. To resolve the problem, we propose a sound field control technique to prevent the response sound from being observed. Combined with a microphone array, the proposed method can achieve high elimination performance with no adaptive process. The efficacy of the proposed interface is ascertained in the experiments on the basis of sound elimination and speech recognition.

  15. Cytological-cytogenetic analyses of winter flounder embryos collected from the Benthos at the barge North Cape oil spill

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, J B [Milford Laboratory, CT (United States). Northeast Fisheries Science Center

    1999-01-01

    The oil barge North Cape ran aground on Moonstone Beach in Rhode Island on January 19, 1996, spilling 828 000 gallons (US) of a combination of diesel and home heating oils. Samples of winter flounder embryos were collected from salt ponds in the area of the spill using an epibenthic sled. An examination of the field-sampled embryos based on gross morphology, levels of moribund embryos, mitotic index, and chromosomal anomalies found that a significant number exhibited high levels of one or more of these conditions when compared with flounder embryos raised under laboratory-controlled conditions. No chorion damage was noted in embryos collected from the field nor were there any significant findings of lordosis or scoliosis. The cumulative impact on winter flounder embryos of North Cape oil exposure was an estimated 51% reduction in the number of embryos surviving to the larval stage. (author)

  16. DESAIN SELF-PROPELLED CAR BARGE UNTUK DISTRIBUSI MOBIL BARU RUTE CIKARANG BEKASI LAUT (CBL – TANJUNG PERAK

    Directory of Open Access Journals (Sweden)

    Bintang Jiwa Jiwa

    2017-01-01

    Full Text Available Berbagai upaya telah dilakukan Pemerintah untuk dapat mengurangi kemacetan jalur Pantura. Mulai dari pemberian jalur alternatif, pelebaran jalan, hingga pembuatan jalan tol baru. Segala upaya tersebut tidak sebanding dengan jumlah kendaraan yang terus meningkat melewati jalur Pantura, khususnya kendaraan-kendaraan barang seperti truk dan kontainer. Hal ini tidak terlepas dari geliat perekonomian yang terus tumbuh. Kawasan industri otomotif di sekitar Cikarang dan Bekasi salah satu contohnya. Jumlah produksi mobil domestik dan permintaan yang terus meningkat ini membutuhkan sarana yang baik dan cepat dalam mendistribusikan mobil baru ke berbagai daerah. Dalam beberapa tahun ini, Jawa Timur merupakan provinsi dengan tingkat permintaan mobil yang cukup tinggi di Indonesia. Oleh karena itu, salah satu solusi yang ditawarkan untuk dapat mengurangi kemacetan di jalur darat adalah berupa pengalihan transportasi darat ke sungai atau laut. Berdasarkan solusi tersebut, maka dibutuhkan alat transportasi pengangkut barang, dalam hal ini mobil, yang dapat melewati sungai dan laut. Self-propelled car barge diharapkan mampu menjadi inovasi yang cukup baik dalam mendistribusikan barang melalui rute Sungai Cikarang Bekasi Laut (CBL menuju ke Pelabuhan Tanjung Perak. Untuk mendapatkan ukuran utama yang optimum digunakan metode optimation design approach dengan bantuan fitur solver pada program Microsoft Excel dengan menjadikan biaya pembangunan paling minimum sebagai fungsi objektif, serta adanya batasan-batasan dari persyaratan teknis dan regulasi yang ada. Dari proses optimisasi, didapatkan ukuran utama optimum Self-Propelled Car Barge adalah L=53.10 m, B=15.17 m, TFW=3.09 m, TSW=3.02 m, dan H=4.66 m, dengan estimasi biaya pembangunan sebesar $1.435.270,56 atau setara Rp.19.281.424.757,10.

  17. Time and dose assessment of barge shipment and at-reactor handling of a CASTOR V/21 spent fuel storage cask

    Energy Technology Data Exchange (ETDEWEB)

    Hostick, C.J. (Pacific Northwest Lab., Richland, WA (United States)); Lavender, J.C. (Westinghouse Hanford Co., Richland, WA (United States)); Wakeman, B.H. (Virginia Electric and Power Co., Richmond, VA (United States))

    1992-04-01

    This report contains the results of a time/motion analysis and a radiation dose assessment made during the receipt from barge transport and the loading of CAst iron cask for Storage and Transport Of Radioactive material (CASTOR) V/21 storage casks with spent nuclear fuel at the Surry Power Station in Virginia during 1987. The study was a cooperative effort between Pacific Northwest Laboratory (PNL) and Virginia Electric and Power Company (Virginia Power), and was funded by the US Department of Energy (DOE) Transportation Program Office. In this study, cask handling activities were tracked at the Surry Power Station, tracing the transfer of the empty spent fuel storage cask from an ocean-going vessel to a barge for river transport through the activities required to place the loaded storage cask at an at-reactor storage location.

  18. Fixed position holding control for self-propulsion barges under disturbance condition; Gairanka ni okeru jiko baji no teiten hoji seigyo ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Kijima, K; Murata, W; Furukawa, Y [Kyushu University, Fukuoka (Japan). Faculty of Engineering

    1996-04-10

    In direct hoisting work in suspension bridge construction, since a cable crane directly hoists a bridge beam block put on a barge on the sea, precise fixed position holding function is required for a barge. The control system was then designed on the basis of an ILQ control theory, and the effect of change in time constant as design parameter on fixed position holding performance was studied. In addition, the critical disturbance for fixed position holding control was studied through numerical simulation under various disturbance conditions using the above designed control system. As a result, in the design of control systems on the basis of an ILQ control theory, the precise control system could be designed by diminishing, in particular, the time constant for state variable around a z axis among time constants according to the extent of disturbance. The control performance was largely affected by response delay period from sensing of disturbance to beginning of control. 3 refs., 7 figs., 2 tabs.

  19. The transportation operations system: A description

    International Nuclear Information System (INIS)

    Best, R.E.; Danese, F.L.; Dixon, L.D.; Peterson, R.W.; Pope, R.B.

    1990-01-01

    This paper presents a description of the system for transporting radioactive waste that may be deployed to accomplish the assigned system mission, which includes accepting spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from waste generator sites and transporting them to the FWMS destination facilities. The system description presented here contains, in part, irradiated fuel and waste casks, ancillary equipments, truck, rail, and barge transporters, cask and vehicle traffic management organizations, maintenance facilities, and other operations elements. The description is for a fully implemented system, which is not expected to be achieved, however, until several years after initial operations. 6 figs

  20. Development of NUPAC 140B 100 ton rail/barge cask

    International Nuclear Information System (INIS)

    1990-04-01

    The 140-B Cask Ancillary Equipment includes all cask-related hardware necessary for a complete transportation package and for handling of the cask at shipping and receiving facilities. The transportation package equipment includes the cask tiedown system, the railcar and the sunshield/personnel barrier. The cask handling systems include both single and dual load path cask lifting fixtures, a cask uprighting system, an intermodal transfer system, and the cask drain and fill system. This document describes the individual systems in terms of their purpose, their function, and their mechanical features. Structural analyses are provided for the cask lifting and tiedown devices. The cask ancillary equipment will also include special tools and equipment such as seal surface protection device, special torque wrenches, leak test equipment, etc., for handling the cask at a reactor site. Although final design work remains to be completed, the ancillary equipment design information presented in this document ensures that the 140-B cask transportation package will meet or exceed all structural, functional, and operational requirements, within the specified gross vehicle weight limit. 18 figs

  1. Implementation of the project for the construction and operation of a nuclear heat and power plant on the basis of a floating power unit with KLT-40C reactors

    Energy Technology Data Exchange (ETDEWEB)

    Polushkin, A K; Kuzin, E A [JSC Malaya Energetika, Moscow (Russian Federation); Vorobiov, V M [JSC Atomenergo, St. Petersburg (Russian Federation); Klykov, D M [JSC Iceberg, St. Petersburg (Russian Federation); Panov, J K [OKBM, Nizhny Novgorod (Russian Federation)

    2000-09-01

    This paper presents the results of research and development on floating nuclear power plant (FNPP) for electricity and heat production for remote locations and small island or coastal communities. Evaluations of construction period, social and economic factors as well as safety and operational issues of the non-self-propelled barge-mounted NPP is given. (author)

  2. Implementation of the project for the construction and operation of a nuclear heat and power plant on the basis of a floating power unit with KLT-40C reactors

    International Nuclear Information System (INIS)

    Polushkin, A.K.; Kuzin, E.A.; Vorobiov, V.M.; Klykov, D.M.; Panov, J.K.

    2000-01-01

    This paper presents the results of research and development on floating nuclear power plant (FNPP) for electricity and heat production for remote locations and small island or coastal communities. Evaluations of construction period, social and economic factors as well as safety and operational issues of the non-self-propelled barge-mounted NPP is given. (author)

  3. The operational efficiency of waterway transport of forest chips on Finland's Lake Saimaa

    Energy Technology Data Exchange (ETDEWEB)

    Karttunen, K.; Ranta, T. [Lappeenranta Univ. of Technology, LUT Savo Sustainable Technologies, Mikkeli (Finland); Vaatainen, K.; Asikainen, A. [The Finnish Forest Research Inst., Joensuu (Finland)], E-mail: kalle.karttunen@lut.fi

    2012-11-01

    New and cost-efficient methods for use in supply chains for energy wood should be found, to reach the targets of the renewable energy utilisation set by the European Union. The long-distance waterway transportation of forest fuels should be thoroughly investigated, especially in areas where the transport distance is long and waterways could provide a feasible method of conveying forest fuel. In comparison to transport of forest chips by truck, barge-based waterway transport shows a competitive advantage due to the larger loads and higher bulk density of chips it allows. The cost-efficiency of waterway transportation operations related to forest chips in Finland's Lake Saimaa region was studied using practical demonstrations and discrete-event simulation. The varying demand for fuel wood in three separate bio-power plants on the Saimaa lakeside (near the cities of Varkaus, Mikkeli, and Savonlinna) was addressed in several barge transportation scenarios. Finally, the economy of barge transportation was compared to the economy of truck transportation as a function of transportation distance and in terms of the annual performance of the transportation methods examined. The waterway supply chain of forest chips was cost-competitive to road transport by truck after 100-150 km. According to the simulation study, the most economical waterway transport options were based on fixed barge system and shift-independent harbor logistics where loading and unloading of barges were carried-out with a wheeled loader and a belt conveyor. Total supply chain costs including the best waterway logistics from road side storage to power plant ranged from 10.75 euros to 11.64 euros/MWh in distances of 100-150 km by waterways. The energy-density of forest chips in the barge load was found to be, on average, 25% higher than that in truck hauling, because of the better compaction of chips. Waterway transport is a viable option for long-distance transportation of forest chips in Eastern

  4. Economic environmental management of drilling operations

    International Nuclear Information System (INIS)

    Longwell, H.J.; Akers, T.J.

    1992-01-01

    This paper presents significant environmental and regulatory initiatives developed by Exxon's New Orleans Drilling Organization. Specifically, the paper will cover drilling waste minimization techniques and disposal options, recycling of drilling waste streams, and environmentally managed drilling location design considerations. The implementation of some of these initiatives at Exxon's Chalkley field land locations have resulted in a fifty percent reduction in drilling location waste management costs. Some of these same initiatives have been successfully applied to Exxon's barge drilling locations. For operations at the environmentally sensitive Mobile Bay, Exxon contracted with a local company and assisted in the development of an economically and environmentally superior drilling waste disposal and treatment system. In summary, it is possible for drilling operators to pro-actively manage escalating environmental and regulatory challenges through the implementation of economic and practical initiatives

  5. By ship, by barge, by truck : massive Kearl modules to take a new route from South Korea to Alberta via Idaho and Montana highways

    Energy Technology Data Exchange (ETDEWEB)

    Jaremko, D.

    2010-03-15

    Idaho and Montana highways will be used to transport massive oil sands modules for Imperial Oil's Kearl oilsands project. A test module will pass through the states in mid 2010. The local highway patrol will be contracted as an escort in order to reduce the risk of incidents with local drivers. The modules will be shipped from South Korea to Portland and then transported by barge to Lewiston, Idaho. The modules will then be loaded onto trucks and transported along the highway. It will take approximately 10 days to move the modules to the Kearl site near Fort McMurray, Alberta. The loads are so large that they will not fit through rail tunnels or highway overpasses. Imperial Oil will be required to bury some overhead power transmission lines and build approximately 100 pullouts along the route. Traffic signal arms will also be modified to swing out of the way as the loads are passing through. Construction of the Kearl site will be completed by 2012. 2 figs.

  6. Coupled dynamic analysis of subsea pipe laying operations

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Danilo Machado Lawinscky da; Jacob, Breno Pinheiro [Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE/UFRJ), Rio de Janeiro, RJ (Brazil). Programa de Engenharia Civil. Lab. of Computational Methods and Offshore Systems

    2009-12-19

    It is recognized that deep water offshore oil exploitation activities requires the use of sophisticated computational tools to predict the behavior of floating offshore systems under the action of environmental loads. These computational tools should be able to perform coupled dynamic analyses, considering the non-linear interaction of the hydrodynamic behavior of the platform with the structural/hydrodynamic behavior of the mooring lines and risers, represented by Finite Element models. The use of such a sophisticated computational tool becomes mandatory not only for the design of production platforms, but also for the simulation of offshore installation operations. For instance, in the installation of submarine pipelines, the wall thickness design may not be governed by the pressure containment requirements of the pipeline during the operation, but by the installation process, specifically the combined action of bending, tension and hydrostatic pressure acting on the pipeline, that is also submitted to the motions of the lay barge. Therefore, the objective of this work is to present the results of numerical simulations of S-lay installation procedures using a computational tool that performs dynamic analysis coupling the structural behavior of the pipe with the hydrodynamic behavior of the vessel motions under environmental conditions. This tool rigorously considers the contact between the pipeline and its supports (lay barge, stinger, seabed). The results are compared to traditional pipe laying simulations based on RAO motions. (author)

  7. 77 FR 20727 - Seagoing Barges

    Science.gov (United States)

    2012-04-06

    ... response to the direct final rule. In the first comment, the commenter stated that without a definition of... that without a definition of the term ``manned,'' the rule would be ineffective. In the direct final... are adverse comments. In the first comment, the commenter expressed concern that, without a definition...

  8. 77 FR 18929 - Seagoing Barges

    Science.gov (United States)

    2012-03-29

    ... instruction in oceanography or limnology, or both, or exclusively in oceanographic research, * * *. Under 46 U... or limnology, or both, or exclusively in oceanographic research, * * * *. Under 46 U.S.C. 443, ``an... ``* * * being employed exclusively in instruction in oceanography or limnology, or both, or exclusively in...

  9. Waterway Equipment - Boat, Barge, Motor

    Science.gov (United States)

    2012-09-25

    Equation 3 LCG = (Dfwd * Wfwd) + ( Daft * Waft) / W Equation 4 where: Wfwd = sum of weights from forward scales Waft = sum of weights from...aft scales W = Wfwd + Waft = weight of craft as inclined Dfwd = longitudinal distance of forward scales from the reference point Daft

  10. 76 FR 77712 - Seagoing Barges

    Science.gov (United States)

    2011-12-14

    ... procedural and merely align the text of the regulations with current law and Coast Guard practice. An... submitted to our online docket via http://www.regulations.gov on or before February 13, 2012 or reaches the... Vessel Inspection Circular Pub. L. Public Law U.S.C. United States Code III. Regulatory Information We...

  11. 78 FR 2147 - Seagoing Barges

    Science.gov (United States)

    2013-01-09

    ... voluntarily continue to undergo inspection and to maintain certification. This may reflect a rational business... Coast Guard message dated April 18, 1996, establishing that policy.) The 250-barrel threshold is also... the same impact; in both cases sections 90.05-25 and 91.01-10 would be aligned with 46 U.S.C. 2101(32...

  12. An analysis of contingencies for making casks available for use during the early years of Federal Waste Management System operations

    International Nuclear Information System (INIS)

    Johnson, P.E.; Joy, D.S.; Pope, R.B.; Shappert, L.B.; Wankerl, M.W.; Best, R.E.; Schmid, S.; Danese, F.L.

    1992-01-01

    A study has been performed to examine the contingencies that could be pursued by the Department of Energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) for shipping spent fuel beginning in 1998. OCRWM's current plan is to initiate operations using early production units of Initiative I truck and rail/barge casks that are presently being designed. Contingencies to this plan were considered in case some unforeseen event occurs that precludes the Initiative I casks from entering into service early in 1998 in sufficient quantities (both numbers and types) to satisfy DOE's shipping needs. Specifically, the study addressed the potential availability of cask systems, selected several cask usage scenarios, determined the requirements for casks under these scenarios, generically assessed different strategies for acquiring casks or the use of casks, and generically assessed cask fabrication capabilities. Issues concerning both domestic and foreign resources were addressed with a focus on the first five years of Federal Waste Management System (FWMS) operation

  13. Spatial Operations

    Directory of Open Access Journals (Sweden)

    Anda VELICANU

    2010-09-01

    Full Text Available This paper contains a brief description of the most important operations that can be performed on spatial data such as spatial queries, create, update, insert, delete operations, conversions, operations on the map or analysis on grid cells. Each operation has a graphical example and some of them have code examples in Oracle and PostgreSQL.

  14. Operational amplifiers

    CERN Document Server

    Dostal, Jiri

    1993-01-01

    This book provides the reader with the practical knowledge necessary to select and use operational amplifier devices. It presents an extensive treatment of applications and a practically oriented, unified theory of operational circuits.Provides the reader with practical knowledge necessary to select and use operational amplifier devices. Presents an extensive treatment of applications and a practically oriented, unified theory of operational circuits

  15. Operating systems

    CERN Document Server

    Tsichritzis, Dionysios C; Rheinboldt, Werner

    1974-01-01

    Operating Systems deals with the fundamental concepts and principles that govern the behavior of operating systems. Many issues regarding the structure of operating systems, including the problems of managing processes, processors, and memory, are examined. Various aspects of operating systems are also discussed, from input-output and files to security, protection, reliability, design methods, performance evaluation, and implementation methods.Comprised of 10 chapters, this volume begins with an overview of what constitutes an operating system, followed by a discussion on the definition and pr

  16. Operational calculus

    CERN Document Server

    Boehme, Thomas K

    1987-01-01

    Operational Calculus, Volume II is a methodical presentation of operational calculus. An outline of the general theory of linear differential equations with constant coefficients is presented. Integral operational calculus and advanced topics in operational calculus, including locally integrable functions and convergence in the space of operators, are also discussed. Formulas and tables are included.Comprised of four sections, this volume begins with a discussion on the general theory of linear differential equations with constant coefficients, focusing on such topics as homogeneous and non-ho

  17. Offshore wind farm Bockstigen - installation and operation experience

    Energy Technology Data Exchange (ETDEWEB)

    Lange, B [Risoe National Lab., Wind Energy and Atmospheric Physics Dept., Roskilde (Denmark); Aagaard, E; Andersen, P E; Moeller, A [Wind World af 1997 A/S, Noerresundby (Denmark); Niklasson, S; Wickman, A [Vindkompaniet, Degerhamn (Sweden)

    1999-03-01

    The first Swedish offshore wind farm Bockstigen is operating since March 1998 near the coast of Gotland. It was built as a demonstration project by the Swedish wind farm developer Vindkompaniet, the Danish wind turbine manufacturer Wind World and the British offshore construction company Seacore and partly funded under the EU-THERMIE program. Bockstigen is the fourth offshore wind farm world-wide. While at previous wind farms the main emphasis laid on the demonstration of the technical feasibility of offshore wind energy utilisation, Bockstigen was aimed at demonstrating its economic viability. A number of innovative concepts have been employed: Drilled monopile foundations were used to save costs. A new construction method has been applied making use of a jack-up barge. A new control system for the turbines and the whole wind farm was developed, which controls the maximum power output, the flicker and the reactive power consumption depending on online measurements of the actual grid state. These new developments have been implemented successfully. A substantial cost reduction compared to previous offshore projects could be achieved. (au)

  18. Spacecraft operations

    CERN Document Server

    Sellmaier, Florian; Schmidhuber, Michael

    2015-01-01

    The book describes the basic concepts of spaceflight operations, for both, human and unmanned missions. The basic subsystems of a space vehicle are explained in dedicated chapters, the relationship of spacecraft design and the very unique space environment are laid out. Flight dynamics are taught as well as ground segment requirements. Mission operations are divided into preparation including management aspects, execution and planning. Deep space missions and space robotic operations are included as special cases. The book is based on a course held at the German Space Operation Center (GSOC).

  19. Operator substitution

    NARCIS (Netherlands)

    Hautus, M.L.J.

    1994-01-01

    Substitution of an operator into an operator-valued map is defined and studied. A Bezout-type remainder theorem is used to derive a number of results. The tensor map is used to formulate solvability conditions for linear matrix equations. Some applications to system theory are given, in particular

  20. Operation amplifier

    NARCIS (Netherlands)

    Tetsuya, Saito; Nauta, Bram

    2008-01-01

    To provide an operation amplifier which improves power source voltage removal ratios while assuring phase compensation characteristics, and therefore can be realized with a small-scale circuit and low power consumption. SOLUTION: The operation amplifier comprises: a differential amplifier circuit 1;

  1. Operation Amplifier

    NARCIS (Netherlands)

    Tetsuya, Saito; Nauta, Bram

    2011-01-01

    PROBLEM TO BE SOLVED: To provide an operation amplifier which improves power source voltage removal ratios while assuring phase compensation characteristics, and therefore can be realized with a small-scale circuit and low power consumption. SOLUTION: The operation amplifier comprises: a

  2. Operation Amplifier

    NARCIS (Netherlands)

    Tetsuya, S.; Nauta, Bram

    2007-01-01

    PROBLEM TO BE SOLVED: To provide an operation amplifier which improves power source voltage removal ratios while assuring phase compensation characteristics, and therefore can be realized with a small-scale circuit and low power consumption. ; SOLUTION: The operation amplifier comprises: a

  3. Accelerator operations

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    Operations of the SuperHILAC, the Bevatron/Bevalac, and the 184-inch Synchrocyclotron during the period from October 1977 to September 1978 are discussed. These include ion source development, accelerator facilities, the Heavy Ion Spectrometer System, and Bevelac biomedical operations

  4. Vinyl Chloride Barge Loading - Mantua Terminals

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  5. List of Inspected Tank Barges and Tankships

    Science.gov (United States)

    1980-01-01

    M 0 cc 40 0 f w 1 Elr2 i x Ei2 x2 22 MrV 22 Z11 7-s- . 22( ti3. (I 7. X’ 00 00 00 V i Z0 X-. Z XW 0 ZAW W’ 1W "J w &xm0. 0 .7. w il WWL I9 1.-1 lli...C:aL ItC tC w It 0lA 41 t~ f 00’ C3 a M !C 04 m, 0’ Lf 0 16% Lf TUN ; 7 -a N.4 NO % 1.4a,0 ry uh C0 04 V .. Ml 1 % 4 HI0 10 4 tm .t 1 4 in4r 0 114 Zw

  6. Hanaro operation

    International Nuclear Information System (INIS)

    Lee, Ji Bok; Jeon, Byung Jin; Kwack, Byung Ho

    1997-01-01

    HANARO was configurated its first operating core in 1995. Long term operation test was conducted up to 3-1 cycle during 1996, in order to investigate the reactor characteristics due to fuel depletion and additional fuel loading. Now HANARO has accumulated 168.4 days of total operation time and 2,687.5 MWD of total thermal output. Reactor analysis, producing operation datum and its validation with test, periodic inspection and maintenance of the facility are continuously conducted for safe operation of the HANARO. Conducted the verification tests for installed utilization facilities, and successfully performed the radiation emergency drill. The shutdown report of TRIGA Mark II and III was submitted to MOST, and decommissioning will be started from 1997. (author). 70 tabs., 50 figs., 27 refs

  7. Reactor operation

    CERN Document Server

    Shaw, J

    2013-01-01

    Reactor Operation covers the theoretical aspects and design information of nuclear reactors. This book is composed of nine chapters that also consider their control, calibration, and experimentation.The opening chapters present the general problems of reactor operation and the principles of reactor control and operation. The succeeding chapters deal with the instrumentation, start-up, pre-commissioning, and physical experiments of nuclear reactors. The remaining chapters are devoted to the control rod calibrations and temperature coefficient measurements in the reactor. These chapters also exp

  8. Operator programs and operator processes

    NARCIS (Netherlands)

    Bergstra, J.A.; Walters, P.

    2003-01-01

    We define a notion of program which is not a computer program but an operator program: a detailed description of actions performed and decisions taken by a human operator (computer user) performing a task to achieve a goal in a simple setting consisting of that user, one or more computers and a

  9. Operator theory

    CERN Document Server

    2015-01-01

    A one-sentence definition of operator theory could be: The study of (linear) continuous operations between topological vector spaces, these being in general (but not exclusively) Fréchet, Banach, or Hilbert spaces (or their duals). Operator theory is thus a very wide field, with numerous facets, both applied and theoretical. There are deep connections with complex analysis, functional analysis, mathematical physics, and electrical engineering, to name a few. Fascinating new applications and directions regularly appear, such as operator spaces, free probability, and applications to Clifford analysis. In our choice of the sections, we tried to reflect this diversity. This is a dynamic ongoing project, and more sections are planned, to complete the picture. We hope you enjoy the reading, and profit from this endeavor.

  10. Operation Starvation

    National Research Council Canada - National Science Library

    Mason, Gerald

    2002-01-01

    More than 1,250,000 tons of shipping was sunk or damaged in the last five months of World War II when Twenty-first Bomber Command executed an aerial mining campaign against Japan known as Operation STARVATION...

  11. Peace Operations

    National Research Council Canada - National Science Library

    Proks, Josef

    2000-01-01

    Peace operations are more and more important in the contemporary world. The end of the Cold War increased not only possibilities of solving disputes by the international community but also by the number and diversity of threats and issues...

  12. Operator training

    International Nuclear Information System (INIS)

    Wirstad, J.

    1983-12-01

    The traditional operator job is changing, which among other things has generated a need for better job training. Surprisingly increased process automation has lead to increased operator qualifications, i.e. basic job training but also up-date and rehearsal training within certain fixed intervals. There are several, similar models for instructional system development available in the literature. One model which is of special interest integrates Operator Training development and Man-Machine Interfaces development. The extent to which Systematic Operator Training has been implemented varies with branches and companies. The nuclear power branch is given as an example in the report. This branch probably represents something better than the average among the process industries.(author)

  13. Operative Links

    DEFF Research Database (Denmark)

    Wistoft, Karen; Højlund, Holger

    2012-01-01

    educational goals, learning content, or value clarification. Health pedagogy is often a matter of retrospective rationalization rather than the starting point of planning. Health and risk behaviour approaches override health educational approaches. Conclusions: Operational links between health education......, health professionalism, and management strategies pose the foremost challenge. Operational links indicates cooperative levels that facilitate a creative and innovative effort across traditional professional boundaries. It is proposed that such links are supported by network structures, shared semantics...

  14. Applied Operations Research: Operator's Assistant

    Science.gov (United States)

    Cole, Stuart K.

    2015-01-01

    NASA operates high value critical equipment (HVCE) that requires trouble shooting, periodic maintenance and continued monitoring by Operations staff. The complexity HVCE and information required to maintain and trouble shoot HVCE to assure continued mission success as paper is voluminous. Training on new HVCE is commensurate with the need for equipment maintenance. LaRC Research Directorate has undertaken a proactive research to support Operations staff by initiation of the development and prototyping an electronic computer based portable maintenance aid (Operator's Assistant). This research established a goal with multiple objectives and a working prototype was developed. The research identified affordable solutions; constraints; demonstrated use of commercial off the shelf software; use of the US Coast Guard maintenance solution; NASA Procedure Representation Language; and the identification of computer system strategies; where these demonstrations and capabilities support the Operator, and maintenance. The results revealed validation against measures of effectiveness and overall proved a substantial training and capability sustainment tool. The research indicated that the OA could be deployed operationally at the LaRC Compressor Station with an expectation of satisfactorily results and to obtain additional lessons learned prior to deployment at other LaRC Research Directorate Facilities. The research revealed projected cost and time savings.

  15. Operating experience

    International Nuclear Information System (INIS)

    McRae, L.P.; Six, D.E.

    1991-01-01

    In 1987, Westinghouse Hanford Company began operating a first-generation integrated safeguards system in the Plutonium Finishing Plant storage vaults. This Vault Safety and Inventory System is designed to integrate data into a computer-based nuclear material inventory monitoring system. The system gathers, in real time, measured physical parameters that generate nuclear material inventory status data for thousands of stored items and sends tailored report to the appropriate users. These data include canister temperature an bulge data reported to Plant Operations and Material Control and Accountability personnel, item presence and identification data reported to Material Control and Accountability personnel, and unauthorized item movement data reported to Security response forces and Material Control and Accountability personnel. The Westinghouse Hanford Company's experience and operational benefits in using this system for reduce radiation exposure, increase protection against insider threat, and real-time inventory control are discussed in this paper

  16. Operator companion

    International Nuclear Information System (INIS)

    Natalizio, A.; Anderson, J.W.D.; Sills, H.E.

    1988-01-01

    Abundant, cheap computing power has provided industry with a far greater opportunity than was available one or two decades ago to automate industrial processes and to improve the man-machine interface. Exciting innovations in knowledge representation methods arising from artificial intelligence research pave the way for advanced support systems for assisting plant operators. AECL has recognized the importance of knowledge based system technology, particularly expert systems, in the achievement of this objective and also, as a strategic technology to be fully exploited in the next generation of CANDU reactors. Operator Companion, an expert system intended to diagnose plant faults and advise the operator on appropriate restoring or corrective actions, is a major undertaking which is receiving support within the research and engineering groups of AECL

  17. Operative arthroscopy.

    Science.gov (United States)

    Guhl, J F

    1979-01-01

    In a period of 20 months, over 200 patients (age ranged from high school students to middle-aged persons) with knee injuries were treated by operative arthroscopy. The majority of the injuries were incurred while the patients had been participating in athletic events, either competitive or recreational. Operative arthroscopy offers the advantage of shortened hospital stay, rapid rehabilitation, lack of disfiguring scar, and reduced costs. Patients are followed yearly after the first postoperative year. Improved long-term results from diagnostic and operative arthroscopy, as compared to conventional surgical procedures, are expected. The proof of those expectations will be determined in the next several years as this group of patients requiring partial meniscectomies or procedures for pathologic and degenerative conditions is reevaluated.

  18. Accelerator operations

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    This section is concerned with the operation of both the tandem-linac system and the Dynamitron, two accelerators that are used for entirely different research. Developmental activities associated with the tandem and the Dynamitron are also treated here, but developmental activities associated with the superconducting linac are covered separately because this work is a program of technology development in its own right

  19. Operating Systems

    Indian Academy of Sciences (India)

    areas in which this type is useful are multimedia, virtual reality, and advanced scientific projects such as undersea exploration and planetary rovers. Because of the expanded uses for soft real-time functionality, it is finding its way into most current operating systems, including major versions of Unix and Windows NT OS.

  20. Peace Operations

    National Research Council Canada - National Science Library

    Lewis, William

    1995-01-01

    .... Indeed, despite the energetic leadership of Under Secretary-General Kofi R. Annan who directs the Department of Peacekeeping Operations, the organization has increasing difficulty in acquiring properly trained and equipped forces in time to intervene in conflict situations and humanitarian crises.

  1. Operational Circulars

    CERN Multimedia

    2003-01-01

    Operational Circular N° 4 - April 2003 Conditions for use by members of the CERN personnel of vehicles belonging to or rented by CERN - This circular has been drawn up. Operational Circular N° 5 - October 2000 Use of CERN computing facilities - Further details on the personal use of CERN computing facilities Operational Circular N° 5 and its Subsidiary Rules http://cern.ch/ComputingRules defines the rules for the use of CERN computing facilities. One of the basic principles governing such use is that it must come within the professional duties of the user concerned, as defined by the user's divisional hierarchy. However, personal use of the computing facilities is tolerated or allowed provided : a) It is in compliance with Operational Circular N° 5 and not detrimental to official duties, including those of other users; b) the frequency and duration is limited and there is a negligible use of CERN resources; c) it does not constitute a political, commercial and/or profit-making activity; d) it is not...

  2. Operation Context

    DEFF Research Database (Denmark)

    Stüben, Henning; Tietjen, Anne

    2006-01-01

    Abstract: This paper seeks to challenge the notion of context from an operational perspective. Can we grasp the forces that shape the complex conditions for an architectural or urban design within the notion of context? By shifting the gaze towards the agency of architecture, contextual analysis...

  3. Operational indicators

    International Nuclear Information System (INIS)

    2010-01-01

    The chapter presents the operational indicators related to budget, travel costs and tickets, the evolution of the annual program for regulatory inspection, the scientific production, requested patents and the numbers related to the production of the services offered by the Institution

  4. Sources of expertise in transportation planning, management, and operations: Information received as of September 25, 1987

    International Nuclear Information System (INIS)

    1987-01-01

    The DOE Office of Storage and Transportation Systems is responsible for the development and management of a transportation system to provide all the necessary services for the transportation of the spent fuel and wastes from reactor sites to repositories. DOE/ORO has requested Oak Ridge Associated Universities (ORAU) to assist DOE in developing rosters of sources of transportation expertise in: (1) carrier operations; (2) transportation management, planning, and logistics; (3) transportation equipment; (4) transportation facilities design and operation; (5) vehicle safety; and (6) transportation operations quality assurance; as related to truck, rail, barge, and intermodal transportation. Persons or organizations with experience in shipping of non-hazardous materials, spent nuclear fuel, other radioactive materials, and/or other hazardous materials were included in the information system. A mailed inquiry was sent to over 2300 potential sources of transportation expertise. Responses were received from 207 persons and 254 organizations. Section 1 contains the identification numbers of the individuals and organizations that responded. Section 2 contains identification codes, names, addresses, and phone numbers of each of the individual and organization respondents. The reader can refer to Section 2 for the name and address of the respondents for the identification codes listed for each technical area/experience base in Section 1

  5. Site operations

    International Nuclear Information System (INIS)

    House, W.B.; Ebenhack, D.G.

    1989-01-01

    This chapter is a discussion of the management and operations practices used at the Barnwell Waste Management Facility in Barnwell, SC. The following topics are discussed: (1) Waste receiving and inspection, including manifest and certificates of compliance, radiological surveys, disposition of nonconforming items, and decontamination and disposition of secondary waste streams; (2) Waste disposal, including Title 10 CFR 61 requirements, disposal area evaluations, shipment offloading, container emplacement, and radiation protection; (3) Trench closure, including trench backfilling, trench capping, and permanent markers; (4) Site maintenance and stabilization, including trench maintenance, surface water management, and site closure activities; (5) Site monitoring programs, including operational monitoring, and environmental monitoring program; (6) Personnel training and qualifications, including basic training program, safety training program, special skills training, and physical qualifications; (7) Records management, including waste records, personnel training records, personnel dosimetry records, site monitoring records, trench qualification and construction records, and site drawings and stabilization records; (8) Site security; (9) Emergency response plans; and (10) Quality assurance

  6. Operators perspective

    International Nuclear Information System (INIS)

    Scragg, D.M.

    1991-01-01

    There are very few Energy from Municipal Waste processing plants in the U.K. Those which were built have usually been financed and operated by Local Authorities and are now in excess of 17 years old. The Environmental Protection Act and constraints on Public Sector spending have brought about fundamental changes in the approach taken to developing new schemes of this kind. The Public Sector and the Private Sector must work together. The investment in Mass Burning Incineration Schemes generating energy is high and the pressures to keep the waste disposal costs as low as possible mean that recovery of the investment needs to be spread over many years. For any Scheme to be successful and financially viable requires a long term commitment on the part of those involved. This paper sets out the key role which the Operating Contractor can play in this situation. (author)

  7. Operating Cigeo

    International Nuclear Information System (INIS)

    Launeau, F.

    2016-01-01

    The CIGEO facility dedicated to the geological disposal of high- and intermediate-level radioactive wastes will be composed of 2 parts: an underground facility at a depth of 500 m to dispose the waste packages in tunnels and a surface facility to take delivery of the wastes and prepare the packages. The underground facility will be built progressively and will cover a surface of 15 km 2 at the end of Cigeo operating-life. A large part of the surface facility (located a few km away from the waste reception place) will be dedicated to the works led deep underground to build the tunnels and will receive drilling cuttings. The article describes also the ramp and carts to lead waste packages underground. Most of the operations will be automated. The definitive closure of the tunnels will be made with swelling clay and concrete plugs. (A.C.)

  8. Operation Poorman

    International Nuclear Information System (INIS)

    Pruvost, N.; Tsitouras, J.

    1981-01-01

    The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system

  9. Operator errors

    International Nuclear Information System (INIS)

    Knuefer; Lindauer

    1980-01-01

    Besides that at spectacular events a combination of component failure and human error is often found. Especially the Rasmussen-Report and the German Risk Assessment Study show for pressurised water reactors that human error must not be underestimated. Although operator errors as a form of human error can never be eliminated entirely, they can be minimized and their effects kept within acceptable limits if a thorough training of personnel is combined with an adequate design of the plant against accidents. Contrary to the investigation of engineering errors, the investigation of human errors has so far been carried out with relatively small budgets. Intensified investigations in this field appear to be a worthwhile effort. (orig.)

  10. Abandoned Vessels and Barges, Geographic NAD83, LOSCO (1996) [barge_LOSCO_1996

    Data.gov (United States)

    Louisiana Geographic Information Center — This is a point dataset with two accompanying 'sample tables' [vabfldsmpap96] and [vablabsmpap96] that summarize the results of the study to inventory abandoned...

  11. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Lung Operation After Your Operation Your Discharge and Recovery Complete Video After Your Operation Guidance for after ... Your Lung Operation Read Next Your Discharge and Recovery Back to Top Find A Surgeon Find A ...

  12. Report to Congress on Arctic Operations and the Northwest Passage

    Science.gov (United States)

    2011-05-19

    t]he ocean, our coasts, and the Great Lakes provide jobs, food, energy resources, ecological services, recreation, and tourism opportunities, and...a high degree of expensive prefabricated construction. During ice-free periods, the most economical means of transportation is by barge. During

  13. 29 CFR 1926.605 - Marine operations and equipment.

    Science.gov (United States)

    2010-07-01

    ... chapter. The term “longshoring operations” means the loading, unloading, moving, or handling of... surfaces of barges. (1) Employees shall not be permitted to walk along the sides of covered lighters or... a safe passage. (4) Employees shall not be permitted to walk over deckloads from rail to coaming...

  14. Operational Law Handbook,2007

    National Research Council Canada - National Science Library

    2007-01-01

    ... & SOFAs, legal assistance, combating terrorism, domestic operations, noncombatant evacuation operations, special operations, civil affairs, air, sea, and space law, detainee operations, reserve...

  15. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... You Want to Be a Surgeon Resident Resources Teaching Resources Online Guide to Choosing a Surgical Residency ... After Your Operation Your Discharge and Recovery Complete Video After Your Operation Guidance for after the operation ...

  16. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Medical Student Core Curriculum ACS/ASE Medical Student Simulation-Based Surgical Skills Curriculum Cancer Education Cancer Education ... Surgeons Education Patients and Family Skills Programs Your Lung Operation Your Lung Operation DVD After Your Operation ...

  17. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Overview ACS-AEI Consortium Quarterly ACS Chapter News Cancer ... American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation Your Lung Operation DVD After Your Operation ...

  18. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Liability Surgeons as Advocates Surgeons and Bundled Payment Models Surgeons as Institutional Employees Our Changing Health Care ... Lung Operation After Your Operation Your Discharge and Recovery Complete Video After Your Operation Guidance for after ...

  19. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Safety Resources About the Patient Education Program The Recovery Room Choosing Wisely Educational Programs Educational Programs Educational ... Lung Operation After Your Operation Your Discharge and Recovery Complete Video After Your Operation Guidance for after ...

  20. Operator theory, operator algebras and applications

    CERN Document Server

    Lebre, Amarino; Samko, Stefan; Spitkovsky, Ilya

    2014-01-01

    This book consists of research papers that cover the scientific areas of the International Workshop on Operator Theory, Operator Algebras and Applications, held in Lisbon in September 2012. The volume particularly focuses on (i) operator theory and harmonic analysis (singular integral operators with shifts; pseudodifferential operators, factorization of almost periodic matrix functions; inequalities; Cauchy type integrals; maximal and singular operators on generalized Orlicz-Morrey spaces; the Riesz potential operator; modification of Hadamard fractional integro-differentiation), (ii) operator algebras (invertibility in groupoid C*-algebras; inner endomorphisms of some semi group, crossed products; C*-algebras generated by mappings which have finite orbits; Folner sequences in operator algebras; arithmetic aspect of C*_r SL(2); C*-algebras of singular integral operators; algebras of operator sequences) and (iii) mathematical physics (operator approach to diffraction from polygonal-conical screens; Poisson geo...

  1. A Survey on Operator Monotonicity, Operator Convexity, and Operator Means

    Directory of Open Access Journals (Sweden)

    Pattrawut Chansangiam

    2015-01-01

    Full Text Available This paper is an expository devoted to an important class of real-valued functions introduced by Löwner, namely, operator monotone functions. This concept is closely related to operator convex/concave functions. Various characterizations for such functions are given from the viewpoint of differential analysis in terms of matrix of divided differences. From the viewpoint of operator inequalities, various characterizations and the relationship between operator monotonicity and operator convexity are given by Hansen and Pedersen. In the viewpoint of measure theory, operator monotone functions on the nonnegative reals admit meaningful integral representations with respect to Borel measures on the unit interval. Furthermore, Kubo-Ando theory asserts the correspondence between operator monotone functions and operator means.

  2. An analysis of contingencies for making casks available for use during the early years of federal waste management system operations

    International Nuclear Information System (INIS)

    Johnson, P.E.; Pope, R.B.; Wankerl, M.W.; Joy, D.S.; Shappert, L.B.; Danese, F.L.; Best, R.E.; Schmid, S.

    1992-01-01

    This paper reports on a study which has been performed to examine the contingencies that could be pursued by the Department of energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) for shipping spent fuel beginning in 1998. OCRWM's current plan is to initiate operations using early production units of Initiative I truck and rail/barge casks that are presently being designed. Contingencies to this plan were considered in case some unforeseen event occurs that precludes the Initiative I casks from entering into service early in 1998 in sufficient quantities (both numbers and types) to satisfy DOE's shipping needs. Specifically, the study addressed the potential availability of cask systems, selected several cask usage scenarios, determined the requirements for casks under these scenarios, generically assessed different strategies for acquiring casks or the use of casks, and generically assessed cask fabrication capabilities. Issues concerning both domestic and foreign resources were addressed with a focus on the first five years of Federal Waste Management System (FWMS) operation

  3. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... to Participate Resources Webinars for Young Surgeons YFA E-News YFA Advocacy Essay Contest Resident and Associate ... ACS Leader International Exchange Scholar Program Resources RAS E-News Medical Students Operation Giving Back Operation Giving ...

  4. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Careers at ACS Careers at ACS About ACS Career Types Working at ACS ... ( 0 ) Cart Donate American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation Your Lung Operation DVD ...

  5. Space station operations management

    Science.gov (United States)

    Cannon, Kathleen V.

    1989-01-01

    Space Station Freedom operations management concepts must be responsive to the unique challenges presented by the permanently manned international laboratory. Space Station Freedom will be assembled over a three year period where the operational environment will change as significant capability plateaus are reached. First Element Launch, Man-Tended Capability, and Permanent Manned Capability, represent milestones in operational capability that is increasing toward mature operations capability. Operations management concepts are being developed to accomodate the varying operational capabilities during assembly, as well as the mature operational environment. This paper describes operations management concepts designed to accomodate the uniqueness of Space Station Freedoom, utilizing tools and processes that seek to control operations costs.

  6. HFETR operation management

    International Nuclear Information System (INIS)

    Liu Rong; Yang Shuchun; Peng Jun; Zhou Shoukang

    2003-01-01

    Experiences and work methods with High Flux Engineering Test Reactor (HFETR) operation are introduced, which have been accumulated in a long period of operation, in the aspects as reactor operation, test, maintenance, operator training and incident management. It's clear that the safety operation of HFETR has been ensured, and the methods are valid. (authors)

  7. Heat transfer operators associated with quantum operations

    International Nuclear Information System (INIS)

    Aksak, C; Turgut, S

    2011-01-01

    Any quantum operation applied on a physical system is performed as a unitary transformation on a larger extended system. If the extension used is a heat bath in thermal equilibrium, the concomitant change in the state of the bath necessarily implies a heat exchange with it. The dependence of the average heat transferred to the bath on the initial state of the system can then be found from the expectation value of a Hermitian operator, which is named as the heat transfer operator (HTO). The purpose of this paper is to investigate the relation between the HTOs and the associated quantum operations. Since any given quantum operation on a system can be realized by different baths and unitaries, many different HTOs are possible for each quantum operation. On the other hand, there are also strong restrictions on the HTOs which arise from the unitarity of the transformations. The most important of these is the Landauer erasure principle. This paper is concerned with the question of finding a complete set of restrictions on the HTOs that are associated with a given quantum operation. An answer to this question has been found only for a subset of quantum operations. For erasure operations, these characterizations are equivalent to the generalized Landauer erasure principle. For the case of generic quantum operations, however, it appears that the HTOs obey further restrictions which cannot be obtained from the entropic restrictions of the generalized Landauer erasure principle.

  8. Animal Feeding Operations

    Science.gov (United States)

    ... type=”submit” value=”Submit” /> Healthy Water Home Animal Feeding Operations Recommend on Facebook Tweet Share Compartir ... of Concentrated Animal Feeding Operations (CAFOs) What are Animal Feeding Operations (AFOs)? According to the United States ...

  9. Conduct of operations: establishing operational focus and setting operational standards

    International Nuclear Information System (INIS)

    Lane, L.; McGuigan, K.

    1998-01-01

    Due to the nature of our business, we have often tended to focus on the technological aspects of the nuclear industry. The focus of this paper is directed towards the importance of addressing the people skills, attitudes, and 'culture' within, and surrounding, our facilities as key areas of improvement. Within Ontario Hydro Nuclear (OLIN) we have developed the terminology 'event free' operation and 'event free' culture. 'Event Free' recognizes errors as a part of human performance. 'Event Free' takes into account human weaknesses, and provides tools (such as standards) to manage, control, and mitigate errors. In essence, 'Event Free' encompasses two concepts: 1. Prevent errors from occurring; 2. If an error is made, catch it before it can affect safe operation of the facility, learn from the error, and ensure that it does not happen again. In addressing these business realities, Ontario Hydro has identified a number of key support mechanisms and corresponding performance standards that are essential for achieving operating excellence and an 'event free' business culture. This paper will discuss two operational aspects of an 'event free' culture, the first being a set of expectations to enhance the culture, and the second an example of cultural change: 1. Operating Standards - establishing clear expectations for human performance in operating staff; 2. Operational Focus - the understanding that, as a nuclear worker, you should consider every task, activity, in fact everything you do in this business, for the potential to affect safe and reliable operation of a nuclear facility. Note that although the term 'Operational' appears in the title, this concept applies to every individual in the nuclear business, from the cleaner, to the Board of Directors, to the external supplier. (author)

  10. Saxton Transportation Operations Laboratory

    Data.gov (United States)

    Federal Laboratory Consortium — The Saxton Transportation Operations Laboratory (Saxton Laboratory) is a state-of-the-art facility for conducting transportation operations research. The laboratory...

  11. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Surgical Skills for Exposure in Trauma Advanced Trauma Life Support Advanced Trauma Operative Management Basic Endovascular Skills for Trauma Disaster Management and Emergency ...

  12. Separable quadratic stochastic operators

    International Nuclear Information System (INIS)

    Rozikov, U.A.; Nazir, S.

    2009-04-01

    We consider quadratic stochastic operators, which are separable as a product of two linear operators. Depending on properties of these linear operators we classify the set of the separable quadratic stochastic operators: first class of constant operators, second class of linear and third class of nonlinear (separable) quadratic stochastic operators. Since the properties of operators from the first and second classes are well known, we mainly study the properties of the operators of the third class. We describe some Lyapunov functions of the operators and apply them to study ω-limit sets of the trajectories generated by the operators. We also compare our results with known results of the theory of quadratic operators and give some open problems. (author)

  13. International co-operation

    International Nuclear Information System (INIS)

    1998-01-01

    In this part the are reviewed: Co-operation with IAEA; Participation of the Slovakia on the 41 st session of the General Conference; The comprehensive Nuclear-Test-Ban Treaty Organization; Co-operation with the Organization for Economic Co-operation and Development; co-operation with the European Commission; Fulfillment of obligations resulting from the international contracting documents

  14. Biomedical programs operations plans

    Science.gov (United States)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  15. Composite operators in QCD

    International Nuclear Information System (INIS)

    Sonoda, Hidenori

    1992-01-01

    We give a formula for the derivatives of a correlation function of composite operators with respect to the parameters (i.e. the strong fine structure constant and the quark mass) of QCD in four- dimensional euclidean space. The formula is given as spatial integration of the operator conjugate to a parameter. The operator product of a composite operator and a conjugate operator has an unintegrable part, and the formula requires divergent subtractions. By imposing consistency conditions we drive a relation between the anomalous dimensions of the composite operators and the unintegrable part of the operator product coefficients. (orig.)

  16. The AECL operator companion

    International Nuclear Information System (INIS)

    Lupton, L.R.; Anderson, L.L.; Basso, R.A.J.

    1989-11-01

    As CANDU plants become more complex, and are operated under tighter constraints and for longer periods between outages, plant operations staff will have to absorb more information to correctly and rapidly respond to upsets. A development program is underway at AECL to use expert systems and interactive media tools to assist operations staff of existing and future CANDU plants. The complete system for plant information access and display, on-line advice and diagnosis, and interactive operating procedures is called the Operator Companion. A prototype, consisting of operator consoles, expert systems and simulation modules in a distributed architecture, is currently being developed to demonstrate the concepts of the Operator Companion

  17. Elementary operators on self-adjoint operators

    Science.gov (United States)

    Molnar, Lajos; Semrl, Peter

    2007-03-01

    Let H be a Hilbert space and let and be standard *-operator algebras on H. Denote by and the set of all self-adjoint operators in and , respectively. Assume that and are surjective maps such that M(AM*(B)A)=M(A)BM(A) and M*(BM(A)B)=M*(B)AM*(B) for every pair , . Then there exist an invertible bounded linear or conjugate-linear operator and a constant c[set membership, variant]{-1,1} such that M(A)=cTAT*, , and M*(B)=cT*BT, .

  18. Operation planning device

    International Nuclear Information System (INIS)

    Watanabe, Takashi; Odakawa, Naoto; Erikuchi, Makoto; Okada, Masayuki; Koizumi, Atsuhiko.

    1996-01-01

    The device of the present invention provides a device suitable for monitoring a reactor core state and operation replanning in terms of reactor operation. Namely, (1) an operation result difference judging means judges that replanning is necessary when the operation results deviates from the operation planning, (2) an operation replanning rule data base storing means stores a deviation key which shows various kinds of states where the results deviate from the planning and a rule for replanning for returning to the operation planning on every deviating key, (3) an operation replanning means forms a new operation planning in accordance with the rule which is retrieved based on the deviation key, (4) an operation planning optimizing rule data base storing means evaluates the reformed planning and stores it on every evaluation item, (5) an operation planning optimization means correct the operation planning data so as to be optimized when the evaluation of the means (4) is less than a reference value, and (6) an operation planning display means edits adaptable operation planning data and the result of the evaluation and displays them. (I.S.)

  19. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... to Choosing a Surgical Residency Education Modules Practice Management Workshops Patients and Family Patient Education Patient Education ... Trauma Advanced Trauma Life Support Advanced Trauma Operative Management Basic Endovascular Skills for Trauma Disaster Management and ...

  20. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Congress Educational Program Events and Special Activities Resources Housing and Travel Exhibitors Media Information Clinical Congress 2017 ... Surgical Skills for Exposure in Trauma Advanced Trauma Life Support Advanced Trauma Operative Management Basic Endovascular Skills ...

  1. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... 25- and 50-Year Fellows Recognition Surgical History Group Icons in Surgery Archives Catalog Additional Resources Contact ... for after the operation including review of attached equipment and ways for you to actively participate to ...

  2. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... at ACS ACS and Veterans Diversity at ACS ... and Family Contact My Profile Shop ( 0 ) Cart Donate American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation ...

  3. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Surgeon Specific Registry Trauma Education Trauma Education Trauma Education Advanced Surgical Skills for Exposure in Trauma Advanced Trauma Life Support Advanced Trauma Operative Management Basic Endovascular Skills for Trauma Disaster Management and Emergency ...

  4. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Education Trauma Education Achieving Zero Preventable Deaths Trauma Systems Conference Advanced Surgical Skills for Exposure in Trauma Advanced Trauma Life Support Advanced Trauma Operative Management Basic Endovascular Skills for Trauma Disaster Management and ...

  5. Nonlocal Operational Calculi for Dunkl Operators

    Directory of Open Access Journals (Sweden)

    Ivan H. Dimovski

    2009-03-01

    Full Text Available The one-dimensional Dunkl operator $D_k$ with a non-negative parameter $k$, is considered under an arbitrary nonlocal boundary value condition. The right inverse operator of $D_k$, satisfying this condition is studied. An operational calculus of Mikusinski type is developed. In the frames of this operational calculi an extension of the Heaviside algorithm for solution of nonlocal Cauchy boundary value problems for Dunkl functional-differential equations $P(D_ku = f$ with a given polynomial $P$ is proposed. The solution of these equations in mean-periodic functions reduces to such problems. Necessary and sufficient condition for existence of unique solution in mean-periodic functions is found.

  6. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Mentoring for Excellence in Trauma Surgery Advanced Trauma Life Support Verification, Review, and Consultation Program for Hospitals ... Surgical Skills for Exposure in Trauma Advanced Trauma Life Support Advanced Trauma Operative Management Basic Endovascular Skills ...

  7. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Stay Up to Date with ACS Association Management Jobs Events Find a Surgeon Patients and Family Contact My Profile Shop ( 0 ) Cart Donate American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation ...

  8. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Disaster Management and Emergency Preparedness Rural Trauma Team Development Course Trauma Evaluation and Management Trauma CME The ... for after the operation including review of attached equipment and ways for you to actively participate to ...

  9. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Up to Date with ACS Association Management JACS Jobs Events Find a Surgeon Patients and Family Contact My Profile Shop ( 0 ) Cart Donate American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation ...

  10. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... ACS ACS and Veterans Diversity at ACS ... and Family Contact My Profile Shop ( 0 ) Cart Donate American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation ...

  11. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Online Guide to Choosing a Surgical Residency Practice Management Workshops Patients and Family Patient Education Patient Education ... Trauma Advanced Trauma Life Support Advanced Trauma Operative Management Basic Endovascular Skills for Trauma Disaster Management and ...

  12. Improving operating room safety

    Directory of Open Access Journals (Sweden)

    Garrett Jill

    2009-11-01

    Full Text Available Abstract Despite the introduction of the Universal Protocol, patient safety in surgery remains a daily challenge in the operating room. This present study describes one community health system's efforts to improve operating room safety through human factors training and ultimately the development of a surgical checklist. Using a combination of formal training, local studies documenting operating room safety issues and peer to peer mentoring we were able to substantially change the culture of our operating room. Our efforts have prepared us for successfully implementing a standardized checklist to improve operating room safety throughout our entire system. Based on these findings we recommend a multimodal approach to improving operating room safety.

  13. Computer algebra and operators

    Science.gov (United States)

    Fateman, Richard; Grossman, Robert

    1989-01-01

    The symbolic computation of operator expansions is discussed. Some of the capabilities that prove useful when performing computer algebra computations involving operators are considered. These capabilities may be broadly divided into three areas: the algebraic manipulation of expressions from the algebra generated by operators; the algebraic manipulation of the actions of the operators upon other mathematical objects; and the development of appropriate normal forms and simplification algorithms for operators and their actions. Brief descriptions are given of the computer algebra computations that arise when working with various operators and their actions.

  14. Operating System Security

    CERN Document Server

    Jaeger, Trent

    2008-01-01

    Operating systems provide the fundamental mechanisms for securing computer processing. Since the 1960s, operating systems designers have explored how to build "secure" operating systems - operating systems whose mechanisms protect the system against a motivated adversary. Recently, the importance of ensuring such security has become a mainstream issue for all operating systems. In this book, we examine past research that outlines the requirements for a secure operating system and research that implements example systems that aim for such requirements. For system designs that aimed to

  15. Operation training aid device

    International Nuclear Information System (INIS)

    Yoshimura, Sadanori.

    1994-01-01

    The device of the present invention evaluates the propriety of an operation which is conducted optionally by a trainee depending on the state of the plant, analyzes the cause of an operation error and aids the preparation of training policy and teaching materials based on the results of the evaluation and the analysis. Namely, an operation data collection device collects operation data for the plant operation conducted by the trainee and the state of the plant during the operation. Since an operation evaluation device evaluates the plant operation in a short period of time based on the evaluation criteria of an operation evaluation knowledge base, an operation error is never overlooked. Accordingly, uniform and highly reliable operation training at definite evaluation criteria can be obtained. In addition, an error-cause analyzing device and a training policy knowledge base analyze the cause of an error inherent to each of the trainee, and it is recorded systematically independently on every trainees. Since a training policy guide device retrieves and presents an operation error and a cause of the error, there can be prepared a training policy incorporating training with respect to the operation error that each of the trainee tends to commit. (I.S.)

  16. Safe operating envelope

    Energy Technology Data Exchange (ETDEWEB)

    Oliva, N [Ontario Hydro, Toronto, ON (Canada)

    1997-12-01

    Safe Operating Envelope is described representing: The outer bound of plant conditions within which day-to-day plant operation must be maintained in order to comply with regulatory requirements, associated safety design criteria and corporate nuclear safety goals. Figs.

  17. Major operations and activities

    Energy Technology Data Exchange (ETDEWEB)

    Black, D.G.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the major operations and activities on the site. These operations and activities include site management, waste management, environmental restoration and corrective actions, and research and technology development.

  18. Autonomous Systems and Operations

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Autonomous Systems and Operations (ASO) project will develop an understanding of the impacts of increasing communication time delays on mission operations,...

  19. Boiler operator's handbook

    CERN Document Server

    Heselton, Ken

    2004-01-01

    Containing key information for operators and managers of large and small plants, this is an indispensable guide for those at advanced and early stages of their careers, as well as for managers interested in reducing operating expenses.

  20. Joint Operation Planning

    National Research Council Canada - National Science Library

    2006-01-01

    .... It sets forth joint doctrine to govern the joint operation planning activities and performance of the Armed Forces of the United States in joint operations, and provides the joint doctrinal basis...

  1. Crew Transportation Operations Standards

    Science.gov (United States)

    Mango, Edward J.; Pearson, Don J. (Compiler)

    2013-01-01

    The Crew Transportation Operations Standards contains descriptions of ground and flight operations processes and specifications and the criteria which will be used to evaluate the acceptability of Commercial Providers' proposed processes and specifications.

  2. Safe operating envelope

    International Nuclear Information System (INIS)

    Oliva, N.

    1997-01-01

    Safe Operating Envelope is described representing: The outer bound of plant conditions within which day-to-day plant operation must be maintained in order to comply with regulatory requirements, associated safety design criteria and corporate nuclear safety goals. Figs

  3. Major operations and activities

    International Nuclear Information System (INIS)

    Black, D.G.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the major operations and activities on the site. These operations and activities include site management, waste management, environmental restoration and corrective actions, and research and technology development

  4. Vessel Operator System

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Operator cards are required for any operator of a charter/party boat and or a commercial vessel (including carrier and processor vessels) issued a vessel permit from...

  5. Ranking Operations Management conferences

    NARCIS (Netherlands)

    Steenhuis, H.J.; de Bruijn, E.J.; Gupta, Sushil; Laptaned, U

    2007-01-01

    Several publications have appeared in the field of Operations Management which rank Operations Management related journals. Several ranking systems exist for journals based on , for example, perceived relevance and quality, citation, and author affiliation. Many academics also publish at conferences

  6. Emergency operation determination system

    International Nuclear Information System (INIS)

    Miki, Tetsushi.

    1993-01-01

    The system of the present invention can determine an emergency operation coping with abnormal events occurring during nuclear plant operation without replying on an operator's judgement. That is, the system of the present invention comprises an intelligence base which divides and classifies the aims of the plant operation for the function, structure and operation manual and puts them into network. Degree of attainment for the extend of the status normality is determined on every aim of operation based on various kinds of measured data during plant operation. For a degree of attainment within a predetermined range, it is judged that an emergency operation is possible although this is in an abnormal state. Degree of emergency is determined by a fuzzy theory based on the degree of attainment, variation coefficient for the degree of attainment and the sensitivity to external disturbance as parameters. Priority for the degree of emergency on every operation aims is determined by comparison. Normality is successively checked for the determined operation aims. As a result, equipments as objects of abnormality suppressing operation are specified, and the operation amount of the equipments as objects are determined so that the measuring data are within a predetermined range. (I.S.)

  7. Mobile Operating Systems

    OpenAIRE

    Vipin Kamboj; Hitesh Gupta

    2012-01-01

    Mobile phones are used by every people in today’s life. We use mobile phones without knowing the different factors that a mobile used including its technology, operating system, CPU ,RAM etc. Many types of operating system are used by different mobile. Every operating system has their advantage

  8. Status of TRISTAN operation

    International Nuclear Information System (INIS)

    Satoh, Kotaro

    1990-01-01

    The present status of the TRISTAN operation is summarized mainly after the installation of superconducting cavities in the 1988 summer shutdown. The paper describes the initial experience of the superconducting cavity operation, the colliding operation at 30.4 GeV and the beam injection. Future improvement is also reported. (author)

  9. Operations and maintenance philosophy

    International Nuclear Information System (INIS)

    DUNCAN, G.P.

    1999-01-01

    This Operations and Maintenance (O and M) Philosophy document is intended to establish a future O and M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O and M lessons learned into on-going and future project upgrades

  10. On the operator equivalents

    International Nuclear Information System (INIS)

    Grenet, G.; Kibler, M.

    1978-06-01

    A closed polynomial formula for the qth component of the diagonal operator equivalent of order k is derived in terms of angular momentum operators. The interest in various fields of molecular and solid state physics of using such a formula in connection with symmetry adapted operator equivalents is outlined

  11. Lageos assembly operation plan

    Science.gov (United States)

    Brueger, J.

    1975-01-01

    Guidelines and constraints procedures for LAGEOS assembly, operation, and design performance are given. Special attention was given to thermal, optical, and dynamic analysis and testing. The operation procedures illustrate the interrelation and sequence of tasks in a flow diagram. The diagram also includes quality assurance functions for verification of operation tasks.

  12. Operational Intelligence and Operational Design: Thinking about Operational Art

    Science.gov (United States)

    2011-06-01

    captured it best when he wrote, ―Operational intelligence is more or less the fusion of 45 Kent... Market Garden….‖34 Additionally, Drea concluded that the strong-minded General Douglas MacArthur‘s ―sense of destiny‖ shaped his strategic concepts...1960. Memorandum RM-4172-ISA, Santa Monica, CA: The RAND Corporation, September 1964. The Bible . New International Version. Hitchcock, Walter T., ed

  13. Operational symmetries basic operations in physics

    CERN Document Server

    Saller, Heinrich

    2017-01-01

    This book describes the endeavour to relate the particle spectrum with representations of operational electroweak spacetime, in analogy to the atomic spectrum as characterizing representations of hyperbolic space. The spectrum of hyperbolic position space explains the properties of the nonrelativistic atoms; the spectrum of electroweak spacetime is hoped to explain those of the basic interactions and elementary particles. In this book, the theory of operational symmetries is developed from the numbers, from Plato’s and Kepler’s symmetries over the simple Lie groups to their applications in nonrelativistic, special relativistic and general relativistic quantum theories with the atomic spectrum for hyperbolic position and, in first attempts, the particle spectrum for electroweak spacetime. The standard model of elementary particles and interactions is characterized by a symmetry group. In general, as initiated by Weyl and stressed by Heisenberg, quantum theory can be built as a theory of operation groups an...

  14. Shuttle operations era planning for flight operations

    Science.gov (United States)

    Holt, J. D.; Beckman, D. A.

    1984-01-01

    The Space Transportation System (STS) provides routine access to space for a wide range of customers in which cargos vary from single payloads on dedicated flights to multiple payloads that share Shuttle resources. This paper describes the flight operations planning process from payload introduction through flight assignment to execution of the payload objectives and the changes that have been introduced to improve that process. Particular attention is given to the factors that influence the amount of preflight preparation necessary to satisfy customer requirements. The partnership between the STS operations team and the customer is described in terms of their functions and responsibilities in the development of a flight plan. A description of the Mission Control Center (MCC) and payload support capabilities completes the overview of Shuttle flight operations.

  15. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  16. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Contact My Profile Shop ( 0 ) Cart Donate American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation ... facs.org Copyright © 1996-2018 by the American College of Surgeons, Chicago, IL 60611-3295 | Privacy Policy | Terms of Use

  17. Your Lung Operation: After Your Operation

    Medline Plus

    Full Text Available ... Use Patient Opioid Use Position Statements and Task Force Patient Education Initiatives Advocacy and Health Policy Updates Selected Research ... at ACS ACS and Veterans Diversity at ACS ... and Family Contact My Profile Shop ( 0 ) Cart Donate American College of Surgeons Education Patients and Family Skills Programs Your Lung Operation ...

  18. Determination of barge impact probabilities for bridge design.

    Science.gov (United States)

    2016-04-01

    Waterway bridges in the United States are designed to resist vessel collision loads according to design provisions released by the American Association of State : Highway and Transportation Officials (AASHTO). These provisions provide detailed proced...

  19. Noise Pollution Aspects of Barge, Railroad, and Truck Transportation,

    Science.gov (United States)

    1975-04-01

    dBA Trolley 88 dBA 82 dBA 78 dBA 72 dBA Truck 87 dBA 81 dBA 76 dBA 74 dBA Bus 81 dBA 76 dBA 72 dBA 68 dBA Automobile 78 dBA 74 dBA 65 dBA 63 dBA I NO...Environmlent~al Prot~ect~ion Agency, Background Document/linvironment~al Explanat~ion f~or Proposed Int~erstate Rail Carriler Noise Emission Regulat~ions (1974...2). By way of comparison only 0.1 percent automobiles produced this noise level at 70 miles per hour (Figure E-1). Bus and motorcycle noise levels (at

  20. Operations management system

    Science.gov (United States)

    Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.

    1990-01-01

    The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.

  1. Cask fleet operations study

    International Nuclear Information System (INIS)

    1988-01-01

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system

  2. Entanglement branching operator

    Science.gov (United States)

    Harada, Kenji

    2018-01-01

    We introduce an entanglement branching operator to split a composite entanglement flow in a tensor network which is a promising theoretical tool for many-body systems. We can optimize an entanglement branching operator by solving a minimization problem based on squeezing operators. The entanglement branching is a new useful operation to manipulate a tensor network. For example, finding a particular entanglement structure by an entanglement branching operator, we can improve a higher-order tensor renormalization group method to catch a proper renormalization flow in a tensor network space. This new method yields a new type of tensor network states. The second example is a many-body decomposition of a tensor by using an entanglement branching operator. We can use it for a perfect disentangling among tensors. Applying a many-body decomposition recursively, we conceptually derive projected entangled pair states from quantum states that satisfy the area law of entanglement entropy.

  3. Management of Port Operations

    OpenAIRE

    Gheorghe BASANU; Georgiana NUKINA

    2011-01-01

    The Management of port operation requires the proper and efficient use of port facility, equipment for cargo handling, berth facilities, waterways and roads. It also entails the use of effective communications system, storage facilities, and dockworkers. The whole activities mentioned above form the bulk of port operations. The aspiration of port operator is to get cargo through the gateway of ports as fast as possible on to other modes of transport (rail or road) with a minimal cost to them ...

  4. Purge ventilation operability

    International Nuclear Information System (INIS)

    Marella, J.R.

    1995-01-01

    A determination of minimum requirements for purge exhaust ventilation system operability has been performed. HLWE and HLW Regulatory Program personnel have evaluated the various scenarios of equipment conditions and HLWE has developed the requirements for purge exhaust systems. This report is provided to document operability requirements to assist Tank Farm personnel to determine whether a system is operable/inoperable and to define required compensatory actions

  5. Operation Chromite: Amphibious Planning

    OpenAIRE

    2005-01-01

    tut present Tutorial Presentation Interactive Media Element This interactive tutorial covers the Inchon landing case study that provides several good examples of the types of decisions made during the amphibious planning process, and how they compare to the current matrix of the ten primary decisions for amphibious operation required today by joint doctrine. Operation Chromite is used as an example. 8808A Warfighting from the Sea: Amphibious Operations

  6. Network operating system

    Science.gov (United States)

    1985-01-01

    Long-term and short-term objectives for the development of a network operating system for the Space Station are stated. The short-term objective is to develop a prototype network operating system for a 100 megabit/second fiber optic data bus. The long-term objective is to establish guidelines for writing a detailed specification for a Space Station network operating system. Major milestones are noted. Information is given in outline form.

  7. ISACC in Operations

    Science.gov (United States)

    2014-06-01

    19th floor of a Hotel to overlook the entire event. Page 12 of 17 Figure 6: The SPF Operations Centre overlooking the Event Lessons...have a cheap system to help them solve their immediate operational needs. b. Medium enterprises, that need to have quick customization of the...Optimize” tools to help them advance their current operations to a higher service satisfaction level seen by the public. 32. Common across all

  8. Strategic Psychological Operations management

    OpenAIRE

    Sokoloski, Joseph A.

    2005-01-01

    United States Military Psychological Operations are engaged in a type of mass marketing of ideas. To accomplish this The United States Army Civil Affairs and Psychological Operations Command (USACAPOC) employs active and reserve PSYOP units to conduct PSYOP campaigns. However the methodology used to manage these campaigns often hinders the effective employment of timely and effective Psychological Operations. PSYOP has a difficult job to accomplish but PSYOP does not have the proper managemen...

  9. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-11-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the errata page

  10. Miscellaneous Industrial Mineral Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes miscellaneous industrial minerals operations in the United States. The data represent commodities covered by the Minerals Information Team...

  11. Operational Law Handbook,2007

    National Research Council Canada - National Science Library

    2007-01-01

    ...), human rights, rules of engagement, emergency essential civilians supporting military operations, contingency contractor personnel, foreign and deployment, criminal law, environmental law, fiscal law...

  12. Enhancing operational safety

    Energy Technology Data Exchange (ETDEWEB)

    Wiebe, J S

    1997-09-01

    The presentation briefly considers the following aspects concerning enhancing operational safety of NPP: licensed control room supervision, reactivity changes, personnel access to control room, simulator training.

  13. Operational safety reliability research

    International Nuclear Information System (INIS)

    Hall, R.E.; Boccio, J.L.

    1986-01-01

    Operating reactor events such as the TMI accident and the Salem automatic-trip failures raised the concern that during a plant's operating lifetime the reliability of systems could degrade from the design level that was considered in the licensing process. To address this concern, NRC is sponsoring the Operational Safety Reliability Research project. The objectives of this project are to identify the essential tasks of a reliability program and to evaluate the effectiveness and attributes of such a reliability program applicable to maintaining an acceptable level of safety during the operating lifetime at the plant

  14. Operational Modal Analysis Tutorial

    DEFF Research Database (Denmark)

    Brincker, Rune; Andersen, Palle

    of modal parameters of practical interest - including the mode shape scaling factor - with a high degree of accuracy. It is also argued that the operational technology offers the user a number of advantages over traditional modal testing. The operational modal technology allows the user to perform a modal......In this paper the basic principles in operational modal testing and analysis are presented and discussed. A brief review of the techniques for operational modal testing and identification is presented, and it is argued, that there is now a wide range of techniques for effective identification...

  15. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-04-01

    The Operating Units Status Report --- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff on NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non- power reactors in the US

  16. International co-operation

    International Nuclear Information System (INIS)

    Klinda, J.; Lieskovska, Z.

    1998-01-01

    Within the Union Nations (UN) framework, the Slovak Republic participated in following activities on environment protection co-operation: UN European Economic Commission, UN Industrial Development Organization, UN Development Programme, UN Human Habitat Organization, UN Environment Programme, and UN Commission on Sustainable Development. Relevant activities of the Slovak Republic in these co-operations as well as in European Union and OECD activities are reviewed. International conventions and other forms of multilateral co-operation, bilateral co-operation, and international programmes and projects in which the Slovak Republic took participate are presented

  17. Operator interface for vehicles

    Science.gov (United States)

    Bissontz, Jay E

    2015-03-10

    A control interface for drivetrain braking provided by a regenerative brake and a non-regenerative brake is implemented using a combination of switches and graphic interface elements. The control interface comprises a control system for allocating drivetrain braking effort between the regenerative brake and the non-regenerative brake, a first operator actuated control for enabling operation of the drivetrain braking, and a second operator actuated control for selecting a target braking effort for drivetrain braking. A graphic display displays to an operator the selected target braking effort and can be used to further display actual braking effort achieved by drivetrain braking.

  18. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  19. Gyroaveraging operations using adaptive matrix operators

    Science.gov (United States)

    Dominski, Julien; Ku, Seung-Hoe; Chang, Choong-Seock

    2018-05-01

    A new adaptive scheme to be used in particle-in-cell codes for carrying out gyroaveraging operations with matrices is presented. This new scheme uses an intermediate velocity grid whose resolution is adapted to the local thermal Larmor radius. The charge density is computed by projecting marker weights in a field-line following manner while preserving the adiabatic magnetic moment μ. These choices permit to improve the accuracy of the gyroaveraging operations performed with matrices even when strong spatial variation of temperature and magnetic field is present. Accuracy of the scheme in different geometries from simple 2D slab geometry to realistic 3D toroidal equilibrium has been studied. A successful implementation in the gyrokinetic code XGC is presented in the delta-f limit.

  20. Operational Transformation In Co-Operative Editing

    Directory of Open Access Journals (Sweden)

    Mandeep Kaur

    2015-08-01

    Full Text Available Cooperative Editing Systems in real-time allows a virtual team to view and edit a shared document at the same time. The document shared must be synchronized in order to ensure consistency for all the participants. This paper describes the Operational Transformation the evolution of its techniques its various applications major issues and achievements. In addition this paper will present working of a platform where two users can edit a code programming file at the same time.

  1. Operator interface programs for KSTAR operation

    International Nuclear Information System (INIS)

    Lee, Sangil; Park, Mikyung; Park, Jinseop; Na, Hoonkyun; Kwon, M.

    2013-01-01

    Beginning the first plasma discharging experiment of KSTAR since 2008, KSTAR performed the third plasma discharging experiment by 2010. During the experiment of three times, KSTAR OPerator Interface (OPI) programs have been developed for KSTAR operation by itself. OPI programs used in KSTAR were implemented by KSTAR widget plug-in Toolkit (KWT). The KWT means the plug-in library implemented by Qt-based user interface development software. The main purpose of developing the KWT library is to implement full automation libraries having interface with the automated EPICS channel access (CA) guaranteeing the flexibility for requirements of operators. In addition, it has advantages in minimizing human code error and maximizing utilization of the limited human resource. According to the increasing of control systems, a number of OPI servers connected to one EPICS gateway server caused the connection problem and increased the amount of the network data packets. To solve these problems, an algorithm of “CachedChannelAccess” for shared memory base was implemented into an inner logic of the KWT library. KSTAR control system monitoring (CSM) program is one of applications developed by using KWT library. The function of CSM program is to notify alarm to operators by checking health status of every server's network health status and resource (cpu, memory, network packets, disk usage rate and system/user defined process) usage state. Another application is a post-shot sequencing program which is activated after every shot is completed. This application is to display major plasma parameters and diagnostic data in chart form, to save this data to database, and to transfer a chart image file to a web server. This paper describes the technical details how to develop OPI applications which have high productivity using Qt on the EPICS-based control system

  2. Operator interface programs for KSTAR operation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sangil, E-mail: leesi@nfri.re.kr; Park, Mikyung, E-mail: mkpark@nfri.re.kr; Park, Jinseop, E-mail: linupark@nfri.re.kr; Na, Hoonkyun, E-mail: hkna@nfri.re.kr; Kwon, M., E-mail: kwonm@nfri.re.kr

    2013-11-15

    Beginning the first plasma discharging experiment of KSTAR since 2008, KSTAR performed the third plasma discharging experiment by 2010. During the experiment of three times, KSTAR OPerator Interface (OPI) programs have been developed for KSTAR operation by itself. OPI programs used in KSTAR were implemented by KSTAR widget plug-in Toolkit (KWT). The KWT means the plug-in library implemented by Qt-based user interface development software. The main purpose of developing the KWT library is to implement full automation libraries having interface with the automated EPICS channel access (CA) guaranteeing the flexibility for requirements of operators. In addition, it has advantages in minimizing human code error and maximizing utilization of the limited human resource. According to the increasing of control systems, a number of OPI servers connected to one EPICS gateway server caused the connection problem and increased the amount of the network data packets. To solve these problems, an algorithm of “CachedChannelAccess” for shared memory base was implemented into an inner logic of the KWT library. KSTAR control system monitoring (CSM) program is one of applications developed by using KWT library. The function of CSM program is to notify alarm to operators by checking health status of every server's network health status and resource (cpu, memory, network packets, disk usage rate and system/user defined process) usage state. Another application is a post-shot sequencing program which is activated after every shot is completed. This application is to display major plasma parameters and diagnostic data in chart form, to save this data to database, and to transfer a chart image file to a web server. This paper describes the technical details how to develop OPI applications which have high productivity using Qt on the EPICS-based control system.

  3. Crane and Excavator Operator.

    Science.gov (United States)

    Marine Corps Inst., Washington, DC.

    Developed as part of the Marine Corps Institute (MCI) correspondence training program, this course on crane and excavator operation is designed to enable the crane and excavator operator to perform his/her duties more proficiently. Introductory materials include specific information for MCI students, a course introduction, and a study guide…

  4. Science Operations Management

    Science.gov (United States)

    Squibb, Gael F.

    1984-10-01

    The operation teams for the Infrared Astronomical Satellite (IRAS) included scientists from the IRAS International Science Team. The scientific decisions on an hour-to-hour basis, as well as the long-term strategic decisions, were made by science team members. The IRAS scientists were involved in the analysis of the instrument performance, the analysis of the quality of the data, the decision to reacquire data that was contaminated by radiation effects, the strategy for acquiring the survey data, and the process for using the telescope for additional observations, as well as the processing decisions required to ensure the publication of the final scientific products by end of flight operations plus one year. Early in the project, two science team members were selected to be responsible for the scientific operational decisions. One, located at the operations control center in England, was responsible for the scientific aspects of the satellite operations; the other, located at the scientific processing center in Pasadena, was responsible for the scientific aspects of the processing. These science team members were then responsible for approving the design and test of the tools to support their responsibilities and then, after launch, for using these tools in making their decisions. The ability of the project to generate the final science data products one year after the end of flight operations is due in a large measure to the active participation of the science team members in the operations. This paper presents a summary of the operational experiences gained from this scientific involvement.

  5. Health care operations management

    NARCIS (Netherlands)

    Carter, M.W.; Hans, Elias W.; Kolisch, R.

    2012-01-01

    Health care operations management has become a major topic for health care service providers and society. Operations research already has and further will make considerable contributions for the effective and efficient delivery of health care services. This special issue collects seven carefully

  6. Joint Newspaper Operating Agreements.

    Science.gov (United States)

    Parsons, Marie

    The number of competing daily newspapers in American cities has dwindled until only about 50 cities boast two papers. Of the newspapers in those cities, 23 now maintain separate editorial operations but have joint printing, advertising, and circulation departments. The concept of joint operation is 50 years old, dating from the Depression years…

  7. Special Operation. Module 20.

    Science.gov (United States)

    South Carolina State Dept. of Education, Columbia. Office of Vocational Education.

    This module on special operations, one in a series dealing with industrial sewing machines, their attachments, and operation, covers two topics: topstitching and mitering. For each topic these components are provided: an introduction, directions, an objective, learning activities, student information, a student self-check, and a check-out…

  8. NCEP Central Operations

    Science.gov (United States)

    ) NCO Organizational Chart NOAA's Weather and Climate Operational Supercomputing System is known as Climate Climate Prediction Climate Archives Weather Safety Storm Ready NOAA Central Library Photo Library NCO's MISSION * Execute the NCEP operational model suite - Create climate, weather, ocean, space and

  9. Reliance Cell Operator

    Indian Academy of Sciences (India)

    First page Back Continue Last page Overview Graphics. Reliance Cell Operator. Reliance was the only bidder for cellular licences for Assam and NE. Services allowed only in Guwahati and Shillong due to “security reasons”. Only major cities in the country with only one operator.

  10. Characteristics of operating pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gallyamov, A K; Armenskii, E A; Gimaev, R G; Mastobaev, B N; Shammazov, A M

    1977-04-01

    The interval in pressure changes according to operational data for the Kamennyi Log--Perm oil pipeline was determined with the aid of the pattern identification method. This has made it possible to determine pressure changes in the operational process. 2 references, 1 table.

  11. CANDU operating experience

    International Nuclear Information System (INIS)

    McConnell, L.G.; Woodhead, L.W.; Fanjoy, G.R.

    1982-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This paper highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations both to the workers and the public

  12. Basic Sewage Treatment Operation.

    Science.gov (United States)

    Ontario Ministry of the Environment, Toronto.

    This manual was developed for use at workshops designed to introduce operators to the fundamentals of sewage plant operation. The course consists of lecture-discussions and hands-on activities. Each of the lessons has clearly stated behavioral objectives to tell the trainee what he should know or do after completing that topic. Areas covered in…

  13. Operating room manager game

    NARCIS (Netherlands)

    Hans, Elias W.; Nieberg, T.

    2007-01-01

    The operating room (OR) department of a hospital forms the heart of the organization, where the single largest cost is incurred. This document presents and reports on the “Operating Room Manager Game,” developed to give insight into managing a large hospital's OR department at various levels of

  14. Operation auxiliary system (SAO)

    International Nuclear Information System (INIS)

    Lolich, J.; Santome, D.; Drexler, J.

    1990-01-01

    This work presents an auxiliary system for nuclear power plants operation (SAO). The development purpose consisted in a computing supervision system to be installed at different sites of a reactor, mainly in the control room. The inclusion of this system to a nuclear power plant minimizes the possibility of human error for the facility operation. (Author) [es

  15. operation zitadelle (kursk)

    African Journals Online (AJOL)

    Administrator

    placed in terms of the levels of war, according to contemporary doctrine. .... operations and for the administration of such operations for extended periods. ... view is supported by a recent publication by Vego, professor in Military History at .... with short-term and contingency planning in which the tasks that are executed are.

  16. Advanced Tele-operation

    International Nuclear Information System (INIS)

    Decreton, M.

    1998-01-01

    Maintenance, repair, and dismantling operations in nuclear facilities have to be performed remotely when high radiation doses exclude hands-on operation, but also to minimize contamination risks and occupational doses to the operators. Computer-aided and sensor-based tele-operation enhances safety, reliability, and performance by helping the operator in difficult tasks with poor remote environmental perception. The objectives of work in this domain are to increase the scientific knowledge of the studied phenomena, to improve the interpretation of data, to improve the piloting og experimental devices during irradiation, to reveal and to understand possible unexpected phenomena occurring during irradiation. This scientific report describes the achievements for 1997 in the area of radiation tolerance for of remote-sensing, optical fibres and optical fibre sensors

  17. Operations Between Functions

    DEFF Research Database (Denmark)

    Gardner, Richard J.; Kiderlen, Markus

    A structural theory of operations between real-valued (or extended-real-valued) functions on a nonempty subset A of Rn is initiated. It is shown, for example, that any operation ∗ on a cone of functions containing the constant functions, which is pointwise, positively homogeneous, monotonic......, and associative, must be one of 40 explicitly given types. In particular, this is the case for operations between pairs of arbitrary, or continuous, or differentiable functions. The term pointwise means that (f ∗g)(x) = F(f(x), g(x)), for all x ∈ A and some function F of two variables. Several results in the same...... spirit are obtained for operations between convex functions or between support functions. For example, it is shown that ordinary addition is the unique pointwise operation between convex functions satisfying the identity property, i.e., f ∗ 0 = 0 ∗ f = f, for all convex f, while other results classify Lp...

  18. Aircraft operations management manual

    Science.gov (United States)

    1992-01-01

    The NASA aircraft operations program is a multifaceted, highly diverse entity that directly supports the agency mission in aeronautical research and development, space science and applications, space flight, astronaut readiness training, and related activities through research and development, program support, and mission management aircraft operations flights. Users of the program are interagency, inter-government, international, and the business community. This manual provides guidelines to establish policy for the management of NASA aircraft resources, aircraft operations, and related matters. This policy is an integral part of and must be followed when establishing field installation policy and procedures covering the management of NASA aircraft operations. Each operating location will develop appropriate local procedures that conform with the requirements of this handbook. This manual should be used in conjunction with other governing instructions, handbooks, and manuals.

  19. Sustainable Building Operation

    DEFF Research Database (Denmark)

    Jensen, Jesper Ole

    2009-01-01

    of sustainable building operation and a survey amongst building administrators from the private and the social housing sector. Our results show that there are many good examples on sustainable building operation in Danish housing estates, where local building managers, residents etc. have gained impressive......Energy-savings in the existing building stock have becomes a main goal in national and international policies. Often focus is on building-renovations, whereas the potential of sustainable building operation to a large extent has been neglected. Nevertheless, international research as well...... as practical experiences from Danish housing estates indicates that there are large potentials for energy savings by focusing on the operation of the buildings. We suggest that in order to achieve sustainability in the existing housing, renovation and operations should be seen as integrated parts...

  20. Noncommutative operational calculus

    Directory of Open Access Journals (Sweden)

    Henry E. Heatherly

    1999-12-01

    Full Text Available Oliver Heaviside's operational calculus was placed on a rigorous mathematical basis by Jan Mikusinski, who constructed an algebraic setting for the operational methods. In this paper, we generalize Mikusi'{n}ski's methods to solve linear ordinary differential equations in which the unknown is a matrix- or linear operator-valued function. Because these functions can be zero-divisors and do not necessarily commute, Mikusi'{n}ski's one-dimensional calculus cannot be used. The noncommuative operational calculus developed here,however, is used to solve a wide class of such equations. In addition, we provide new proofs of existence and uniqueness theorems for certain matrix- and operator valued Volterra integral and integro-differential equations. Several examples are given which demonstrate these new methods.

  1. Assessing Operational Situations

    DEFF Research Database (Denmark)

    Zhang, Xinxin

    In spite of the high level of automation commonly applied to today’s engineering system, humans’ skill and knowledge still plays a central role in the systems’ daily operation, critical decision making, and accident management. The complexity of the engineered system poses great challenge for human...... operators to perceive and understand the operational situation. The research domain of situation awareness approaches the operational challenges from the human cognition perspective while the presented thesis aims at supporting situation assessment from the system perspective. The thesis has reviewed...... different perspectives on situation awareness in the human factor studies and uses the knowledge reflectively for system representation and analysis. The human cognitive activities during complex plant operation and how they perceive a situation and what kind of knowledge has to be established in the human...

  2. Modern operating systems

    CERN Document Server

    Tanenbaum, Andrew S

    2015-01-01

    Modern Operating Systems, Fourth Edition, is intended for introductory courses in Operating Systems in Computer Science, Computer Engineering, and Electrical Engineering programs. It also serves as a useful reference for OS professionals ' The widely anticipated revision of this worldwide best-seller incorporates the latest developments in operating systems (OS) technologies. The Fourth Edition includes up-to-date materials on relevant'OS. Tanenbaum also provides information on current research based on his experience as an operating systems researcher. ' Modern Operating Systems, Third Editionwas the recipient of the 2010 McGuffey Longevity Award. The McGuffey Longevity Award recognizes textbooks whose excellence has been demonstrated over time.'http://taaonline.net/index.html " Teaching and Learning Experience This program will provide a better teaching and learning experience-for you and your students. It will help: ' *Provide Practical Detail on the Big Picture Concepts: A clear and entertaining writing s...

  3. Integrated formal operations plan

    Energy Technology Data Exchange (ETDEWEB)

    Cort, G.; Dearholt, W.; Donahue, S.; Frank, J.; Perkins, B.; Tyler, R.; Wrye, J.

    1994-01-05

    The concept of formal operations (that is, a collection of business practices to assure effective, accountable operations) has vexed the Laboratory for many years. To date most attempts at developing such programs have been based upon rigid, compliance-based interpretations of a veritable mountain of Department of Energy (DOE) orders, directives, notices, and standards. These DOE dictates seldom take the broad view but focus on highly specialized programs isolated from the overall context of formal operations. The result is a confusing array of specific, and often contradictory, requirements that produce a patchwork of overlapping niche programs. This unnecessary duplication wastes precious resources, dramatically increases the complexity of our work processes, and communicates a sense of confusion to our customers and regulators. Coupled with the artificial divisions that have historically existed among the Laboratory`s formal operations organizations (quality assurance, configuration management, records management, training, etc.), this approach has produced layers of increasingly vague and complex formal operations plans, each of which interprets its parent and adds additional requirements of its own. Organizational gridlock ensues whenever an activity attempts to implement these bureaucratic monstrosities. The integrated formal operations plan presented is to establish a set of requirements that must be met by an integrated formal operations program, assign responsibilities for implementation and operation of the program, and specify criteria against which the performance of the program will be measured. The accountable line manager specifies the items, processes, and information (the controlled elements) to which the formal operations program specified applies. The formal operations program is implemented using a graded approach based on the level of importance of the various controlled elements and the scope of the activities in which they are involved.

  4. Basic operator theory

    CERN Document Server

    Gohberg, Israel

    2001-01-01

    rii application of linear operators on a Hilbert space. We begin with a chapter on the geometry of Hilbert space and then proceed to the spectral theory of compact self adjoint operators; operational calculus is next presented as a nat­ ural outgrowth of the spectral theory. The second part of the text concentrates on Banach spaces and linear operators acting on these spaces. It includes, for example, the three 'basic principles of linear analysis and the Riesz­ Fredholm theory of compact operators. Both parts contain plenty of applications. All chapters deal exclusively with linear problems, except for the last chapter which is an introduction to the theory of nonlinear operators. In addition to the standard topics in functional anal­ ysis, we have presented relatively recent results which appear, for example, in Chapter VII. In general, in writ­ ing this book, the authors were strongly influenced by re­ cent developments in operator theory which affected the choice of topics, proofs and exercises. One ...

  5. Computerized operator decision aids

    International Nuclear Information System (INIS)

    Long, A.B.

    1984-01-01

    This article explores the potential benefits associated with the use of computers in nuclear plants by the operating crew as an aid in making decisions. Pertinent findings are presented from recently completed projects to establish the context in which operating decisions have to be made. Key factors influencing the decision-making process itself are also identified. Safety parameter display systems, which are being implemented in various forms by the nuclear industry, are described within the context of decision making. In addition, relevant worldwide research and development activities are examined as potential enhancements to computerized operator decision aids to further improve plant safety and availability

  6. Operational proof of automation

    International Nuclear Information System (INIS)

    Jaerschky, R.; Reifenhaeuser, R.; Schlicht, K.

    1976-01-01

    Automation of the power plant process may imply quite a number of problems. The automation of dynamic operations requires complicated programmes often interfering in several branched areas. This reduces clarity for the operating and maintenance staff, whilst increasing the possibilities of errors. The synthesis and the organization of standardized equipment have proved very successful. The possibilities offered by this kind of automation for improving the operation of power plants will only sufficiently and correctly be turned to profit, however, if the application of these technics of equipment is further improved and if its volume is tallied with a definite etc. (orig.) [de

  7. Tevatron operational experiences

    International Nuclear Information System (INIS)

    Norris, B.L.; Theilacker, J.C.

    1989-02-01

    Fermilabs superconducting accelerator, the Tevatron has been operational for nearly six years. The history of its operation is presented. Several long shutdowns for superconducting dipole repairs are discussed. The dominant factor influencing the repair was conductor motion which fatigued the cable in the magnet ends. Borescoping and x-raying techniques were used to determine which magnet ends required repair. Detailed downtime logs were kept for each of the running periods. A discussion of the sources of downtime and a comparison for different operating modes is presented

  8. Computer system operation

    International Nuclear Information System (INIS)

    Lee, Young Jae; Lee, Hae Cho; Lee, Ho Yeun; Kim, Young Taek; Lee, Sung Kyu; Park, Jeong Suk; Nam, Ji Wha; Kim, Soon Kon; Yang, Sung Un; Sohn, Jae Min; Moon, Soon Sung; Park, Bong Sik; Lee, Byung Heon; Park, Sun Hee; Kim, Jin Hee; Hwang, Hyeoi Sun; Lee, Hee Ja; Hwang, In A.

    1993-12-01

    The report described the operation and the trouble shooting of main computer and KAERINet. The results of the project are as follows; 1. The operation and trouble shooting of the main computer system. (Cyber 170-875, Cyber 960-31, VAX 6320, VAX 11/780). 2. The operation and trouble shooting of the KAERINet. (PC to host connection, host to host connection, file transfer, electronic-mail, X.25, CATV etc.). 3. The development of applications -Electronic Document Approval and Delivery System, Installation the ORACLE Utility Program. 22 tabs., 12 figs. (Author) .new

  9. CANDU operating experience

    International Nuclear Information System (INIS)

    McConnell, L.G.; Woodhead, L.W.; Fanjoy, G.R.; Thurygill, E.W.

    1980-05-01

    The CANDU-PHW program is based upon 38 years of heavy water reactor experience with 35 years of operating experience. Canada has had 72 reactor years of nuclear-electric operations experience with 10 nuclear units in 4 generating stations during a period of 18 years. All objectives have been met with outstanding performance: worker safety, public safety, environmental emissions, reliable electricity production, and low electricity cost. The achievement has been realized through total teamwork involving all scientific disciplines and all project functions (research, design, manufacturing, construction, and operation). (auth)

  10. Computer system operation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Young Jae; Lee, Hae Cho; Lee, Ho Yeun; Kim, Young Taek; Lee, Sung Kyu; Park, Jeong Suk; Nam, Ji Wha; Kim, Soon Kon; Yang, Sung Un; Sohn, Jae Min; Moon, Soon Sung; Park, Bong Sik; Lee, Byung Heon; Park, Sun Hee; Kim, Jin Hee; Hwang, Hyeoi Sun; Lee, Hee Ja; Hwang, In A [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    The report described the operation and the trouble shooting of main computer and KAERINet. The results of the project are as follows; 1. The operation and trouble shooting of the main computer system. (Cyber 170-875, Cyber 960-31, VAX 6320, VAX 11/780). 2. The operation and trouble shooting of the KAERINet. (PC to host connection, host to host connection, file transfer, electronic-mail, X.25, CATV etc.). 3. The development of applications -Electronic Document Approval and Delivery System, Installation the ORACLE Utility Program. 22 tabs., 12 figs. (Author) .new.

  11. Inter-operability

    International Nuclear Information System (INIS)

    Plaziat, J.F.; Moulin, P.; Van Beurden, R.; Ballet, E.

    2005-01-01

    Building an internal gas market implies establishing harmonized rules for cross border trading between operators. To that effect, the European association EASEE-gas is carrying out standards and procedures, commonly called 'inter-operability'. Set up in 2002, the Association brings together all segments of the gas industry: producers, transporters, distributors, traders and shippers, suppliers, consumers and service providers. This workshop presents the latest status on issues such as barriers to gas trade in Europe, rules and procedures under preparation by EASEE-gas, and the implementation schedule of these rules by operators. This article gathers 5 presentations about this topic given at the gas conference

  12. Operator spin foam models

    International Nuclear Information System (INIS)

    Bahr, Benjamin; Hellmann, Frank; Kaminski, Wojciech; Kisielowski, Marcin; Lewandowski, Jerzy

    2011-01-01

    The goal of this paper is to introduce a systematic approach to spin foams. We define operator spin foams, that is foams labelled by group representations and operators, as our main tool. A set of moves we define in the set of the operator spin foams (among other operations) allows us to split the faces and the edges of the foams. We assign to each operator spin foam a contracted operator, by using the contractions at the vertices and suitably adjusted face amplitudes. The emergence of the face amplitudes is the consequence of assuming the invariance of the contracted operator with respect to the moves. Next, we define spin foam models and consider the class of models assumed to be symmetric with respect to the moves we have introduced, and assuming their partition functions (state sums) are defined by the contracted operators. Briefly speaking, those operator spin foam models are invariant with respect to the cellular decomposition, and are sensitive only to the topology and colouring of the foam. Imposing an extra symmetry leads to a family we call natural operator spin foam models. This symmetry, combined with assumed invariance with respect to the edge splitting move, determines a complete characterization of a general natural model. It can be obtained by applying arbitrary (quantum) constraints on an arbitrary BF spin foam model. In particular, imposing suitable constraints on a spin(4) BF spin foam model is exactly the way we tend to view 4D quantum gravity, starting with the BC model and continuing with the Engle-Pereira-Rovelli-Livine (EPRL) or Freidel-Krasnov (FK) models. That makes our framework directly applicable to those models. Specifically, our operator spin foam framework can be translated into the language of spin foams and partition functions. Among our natural spin foam models there are the BF spin foam model, the BC model, and a model corresponding to the EPRL intertwiners. Our operator spin foam framework can also be used for more general spin

  13. Major Naval Operations

    Science.gov (United States)

    2008-09-01

    operation were to take Turkey out of the war, open a direct link with the Entente’s embattled ally in Russia, force the Germans to shift troops from the...ing craft, while four combat craft (two tor- pedo craft and two light patrol craft) were captured in Port of Adabia. 5. Hartmut Zehrer, ed., Der...mission as a whole is accomplished. At the operational level, the intent is an expression of the commander’s operational vision. It provides a link

  14. Operation statistics of KEKB

    International Nuclear Information System (INIS)

    Kawasumi, Takeshi; Funakoshi, Yoshihiro

    2008-01-01

    KEKB accelerator has been operated since December 1998. We achieved the design peak luminosity of 10.00/nb/s. The present record is 17.12/nb/s. Detailed data of the KEKB Operation is important to evaluate the KEKB performance and to suggest the direction of the performance enhancement. We have classified all KEKB machine time into the following seven categories (1) Physics Run (2) Machine Study (3) Machine Tuning (4) Beam Tuning (5) Trouble (6) Maintenance (7) Others, to estimate the accelerator availability. In this paper we report the operation statistics of the KEKB accelerator. (author)

  15. Operational proof of automation

    International Nuclear Information System (INIS)

    Jaerschky, R.; Schlicht, K.

    1977-01-01

    Automation of the power plant process may imply quite a number of problems. The automation of dynamic operations requires complicated programmes often interfering in several branched areas. This reduces clarity for the operating and maintenance staff, whilst increasing the possibilities of errors. The synthesis and the organization of standardized equipment have proved very successful. The possibilities offered by this kind of automation for improving the operation of power plants will only sufficiently and correctly be turned to profit, however, if the application of these equipment techniques is further improved and if it stands in a certain ratio with a definite efficiency. (orig.) [de

  16. Licensed operating reactors

    International Nuclear Information System (INIS)

    1991-08-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar 1990) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  17. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  18. Nevada Operations overview

    International Nuclear Information System (INIS)

    Church, B.W.

    1981-01-01

    A brief overview is given of weapon test site decontamination activities carried out by Nevada Operations Office. Tabulated data is given of event name, date, location, year of cleanup, and radioisotopes that were present, activity levels, and cost of cleanup

  19. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    THE OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  20. Crushed Stone Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes crushed stone operations in the United States. These data were obtained from information reported voluntarily to the USGS by the aggregate...

  1. Construction Minerals Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes construction minerals operations in the United States. The data represent commodities covered by the Minerals Information Team (MIT) of the...

  2. Agricultural Minerals Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes agricultural minerals operations in the United States. The data represent commodities covered by the Minerals Information Team (MIT) of the...

  3. Sand and Gravel Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes sand and gravel operations in the United States. These data were obtained from information reported voluntarily to the USGS by the aggregate...

  4. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  5. MITS machine operations

    International Nuclear Information System (INIS)

    Flinchem, J.

    1980-01-01

    This document contains procedures which apply to operations performed on individual P-1c machines in the Machine Interface Test System (MITS) at AiResearch Manufacturing Company's Torrance, California Facility

  6. Operating experience feedback

    International Nuclear Information System (INIS)

    Cimesa, S.

    2007-01-01

    Slovenian Nuclear Safety Administration (SNSA) has developed its own system for tracking, screening and evaluating the operating experiences of the nuclear installations. The SNSA staff regularly tracks the operating experiences throughout the world and screens them on the bases of applicability for the Slovenian nuclear facilities. The operating experiences, which pass the screening, are thoroughly evaluated and also recent operational events in these facilities are taken into account. If needed, more information is gathered to evaluate the conditions of the Slovenian facilities and appropriate corrective actions are considered. The result might be the identification of the need for modification at the licensee, the need for modification of internal procedures in the SNSA or even the proposal for the modification of regulations. Information system helps everybody to track the process of evaluation and proper logging of activities. (author)

  7. Nuclear material operations manual

    International Nuclear Information System (INIS)

    Tyler, R.P.

    1981-02-01

    This manual provides a concise and comprehensive documentation of the operating procedures currently practiced at Sandia National Laboratories with regard to the management, control, and accountability of nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations-management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of playscripts in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion

  8. operation zitadelle (kursk)

    African Journals Online (AJOL)

    Administrator

    describe military strategy as a sub-component of a broader term, namely national or ... the allocation of the forces and resources required to achieve those objectives could be .... tactical assets, might be considered operational level actions.

  9. Operations Strategy in practice

    DEFF Research Database (Denmark)

    Rytter, Niels Gorm; Koch, Christian; Boer, Harry

    2005-01-01

    In this paper, we describe and illustrate a new, action-based longitudinal case study approach, which aims at helping scholars narrow the gap between the theory and practice of Operations Strategy (OS). First, we elaborate on the need for new research methods for studying OS in practice. Then, we...... and disadvantages of the method. Finally, we draw conclusions on its potential for operations strategy and operations management studies.......In this paper, we describe and illustrate a new, action-based longitudinal case study approach, which aims at helping scholars narrow the gap between the theory and practice of Operations Strategy (OS). First, we elaborate on the need for new research methods for studying OS in practice. Then, we...

  10. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  11. Information Operations: Where Next?

    National Research Council Canada - National Science Library

    Buchholz, David R

    2005-01-01

    ... to standardized IO training and integration across the combatant commands. For this reason and others there is a compelling argument for the major responsibility for DoD information operations integration to fall under the control of U.S...

  12. Operable Unit Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of operable unit data from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times and...

  13. Nuclear material operations manuals

    International Nuclear Information System (INIS)

    Tyler, R.P.

    1979-06-01

    This manual is intended to provide a concise and comprehensive documentation of the operating procedures currently practiced at Sandia Laboratories with regard to the management, control, and accountability of radioactive and nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations-management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of playscripts in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion

  14. Observer's Report - Okinawa Operation

    National Research Council Canada - National Science Library

    Todd, W. N., Jr

    1945-01-01

    ... for temporary duty in connection with the Okinawa Operation. By verbal agreement between observers, it was decided that each officer would cover certain activities and thus have a complete coverage without duplication...

  15. Payroll Operational Data Store

    Data.gov (United States)

    Social Security Administration — The Payroll ODS will provide a single repository of payroll data to produce accurate and timely financial reports to support operating, budget, and policy decisions.

  16. Operant Conditioning and Education.

    Science.gov (United States)

    de Noronha, Mario

    A case study of a learning disabled 8-year-old with behavior disturbancs is presented to highlight the use of operant conditioning in cutting down educational costs and easing the teacher's class management problems. (CL)

  17. Operating experience with snubbers

    International Nuclear Information System (INIS)

    Levin, H.; Cudlin, R.

    1978-06-01

    Recent operating experience with hydraulic and mechanical snubbers has indicated that there is a need to evaluate current practice in the industry associated with snubber qualification testing programs, design and analysis procedures, selection and specification criteria, and the preservice inspection and inservice surveillance programs. The report provides a summary of operational experiences that represent problems that are generic throughout the industry. Generic Task A-13 is part of the NRC Program for the Resolution of Generic Issues Related to Nuclear Power Plants described in NUREG-0410. The report is based upon a rather large amount of data that have become available in the past four years. These data have been evaluated by the Division of Operating Reactors to develop a data base for use in connection with several NRC activities including Category A, Technical Activity A-13 (Snubbers); the Standard Review Plan; future Regulatory Guides; ASME Code Provisions; and various technical specifications of operating nuclear power plants

  18. Modelling arithmetic operations

    Energy Technology Data Exchange (ETDEWEB)

    Shabanov-kushnarenk, Yu P

    1981-01-01

    The possibility of modelling finite alphabetic operators using formal intelligence theory, is explored, with the setting up of models of a 3-digit adder and a multidigit subtractor, as examples. 2 references.

  19. Nuclear material operations manual

    International Nuclear Information System (INIS)

    Tyler, R.P.; Gassman, L.D.

    1978-04-01

    This manual is intended to provide a concise and comprehensive documentation of the operating procedures currently practiced at Sandia Laboratories with regard to the management, control, and accountability of radioactive and nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations--management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of ''play-scripts'' in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion

  20. Operations Acceptance Management

    OpenAIRE

    Suchá, Ivana

    2010-01-01

    This paper examines the process of Operations Acceptance Management, whose main task is to control Operations Acceptance Tests (OAT). In the first part the author focuses on the theoretical ground for the problem in the context of ITSM best practices framework ITIL. Benefits, process pitfalls and possibilities for automation are discussed in this part. The second part contains a case study of DHL IT Services (Prague), where a solution optimizing the overall workflow was implemented using simp...

  1. Treasury operations management

    OpenAIRE

    Laurențiu Dumitru ANDREI; Petre BREZEANU

    2014-01-01

    Amid the globalization and centralization of treasury operations, establishing the principles for their optimal management is the instrument by means of which economic stability, market dynamics and standards of living can be ensured. The directions of these principles, as well as their flexibility, depend on correctly identifying the objectives of the financial management planning of treasury operations, in compliance with European and international policies related to this area.

  2. Power reactors operational diagnosis

    International Nuclear Information System (INIS)

    Dach, K.; Pecinka, L.

    1976-01-01

    The definition of reactor operational diagnostics is presented and the fundamental trends of research are determined. The possible sources of power reactor malfunctions, the methods of defect detection, the data evaluation and the analysis of the results are discussed in detail. In view of scarcity of a theoretical basis and of insufficient in-core instrumentation, operational diagnostics cannot be as yet incorporated in a computer-aided reactor control system. (author)

  3. Operational Waste Volume Projection

    Energy Technology Data Exchange (ETDEWEB)

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  4. Operational waste volume projection

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1995-06-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the tri-party agreement. Assumptions are current as of June 1995

  5. Operating system MINIX

    OpenAIRE

    JIRKŮ, Radek

    2012-01-01

    This thesis introduces readers to the MINIX operating system, which was used in the creation of the Linux OS. It discusses the history and development of the system and explains its core and the file system. Also solves MINIX installation and configuration of the virtual machine at each step and deals with disputes that had a creator of Minix creator of Linux. In conclusion, compared with Linux MINIX and summarizes the advantages and disadvantages and the use of the operating system at present.

  6. Operational Waste Volume Projection

    International Nuclear Information System (INIS)

    STRODE, J.N.

    2000-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000

  7. Pulsed rf operation analysis

    International Nuclear Information System (INIS)

    Puglisi, M.; Cornacchia, M.

    1981-01-01

    The need for a very low final amplifier output impedance, always associated with class A operation, requires a very large power waste in the final tube. The recently suggested pulsed rf operation, while saving a large amount of power, increases the inherent final amplifier non linearity. A method is presented for avoiding the large signal non linear analysis and it is shown how each component of the beam induced voltage depends upon all the beam harmonics via some coupling coefficients which are evaluated

  8. Quality in drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, E; Gervais, I [Sedco Forex Jacintoport Facility, Channelview, TX (United States); Le Moign, Y; Pangarkar, S; Stibbs, B [Sedco Forex, Montrouge (France); McMorran, P [Sedco Forex, Pau (France); Nordquist, E [Dubai Petroleum Company, Dubai (United Arab Emirates); Pittman, T [Sedco Forex, Perth (Australia); Schindler, H [Sedco Forex, Dubai (United Arab Emirates); Scott, P [Woodside Offshore Petroleum Pty. Ltd., Perth (Australia)

    1997-12-31

    Driven by cost and profitability pressures, quality has taken on new meaning and importance in the oil field during the past decade. In drilling operations, new initiatives have led to cooperative team efforts between operators and drilling contractors to enhance quality. In this article examples are given of how one drilling contractor, by adopting a quality culture, is reaping major benefits for its clients as well as its employees. 22 figs., 19 refs.

  9. Operation of the accelerator

    International Nuclear Information System (INIS)

    GANIL Team

    1992-01-01

    The operation of the GANIL accelerator during 1991 and the first half of 1992 is reported. Results obtained with new beams, metallic beams and the first tests with the new injector system using an ECR source installed on a 100 kV platform are also given. Statistics of operation and beam characteristics are presented. The computer control system is also discussed. (K.A.) 7 refs.; 3 figs.; 8 tabs

  10. Quality in drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, E.; Gervais, I. [Sedco Forex Jacintoport Facility, Channelview, TX (United States); Le Moign, Y.; Pangarkar, S.; Stibbs, B. [Sedco Forex, Montrouge (France); McMorran, P. [Sedco Forex, Pau (France); Nordquist, E. [Dubai Petroleum Company, Dubai (United Arab Emirates); Pittman, T. [Sedco Forex, Perth (Australia); Schindler, H. [Sedco Forex, Dubai (United Arab Emirates); Scott, P. [Woodside Offshore Petroleum Pty. Ltd., Perth (Australia)

    1996-12-31

    Driven by cost and profitability pressures, quality has taken on new meaning and importance in the oil field during the past decade. In drilling operations, new initiatives have led to cooperative team efforts between operators and drilling contractors to enhance quality. In this article examples are given of how one drilling contractor, by adopting a quality culture, is reaping major benefits for its clients as well as its employees. 22 figs., 19 refs.

  11. Microkernel operating systems

    OpenAIRE

    Rudić, Ratko

    2016-01-01

    This thesis outlines history, development and design of microkernel based operating systems. While the idea of microkernel based architecture emerged early in computer science, there are still very few systems adopting this technology. Microkernel operating systems are divided into several different groups and families that frequently share rules, design decisions and development processes. This master thesis focuses on the main representatives of these groups as well as their mutual...

  12. Operating experience: safety perspective

    International Nuclear Information System (INIS)

    Piplani, Vivek; Krishnamurthy, P.R.; Kumar, Neeraj; Upadhyay, Devendra

    2015-01-01

    Operating Experience (OE) provides valuable information for improving NPP safety. This may include events, precursors, deviations, deficiencies, problems, new insights to safety, good practices, lessons and corrective actions. As per INSAG-10, an OE program caters as a fundamental means for enhancing the defence-in-depth at NPPs and hence should be viewed as ‘Continuous Safety Performance Improvement Tool’. The ‘Convention on Nuclear Safety’ also recognizes the OE as a tool of high importance for enhancing the NPP safety and its Article 19 mandates each contracting party to establish an effective OE program at operating NPPs. The lessons drawn from major accidents at Three Mile Island, Chernobyl and Fukushima Daiichi NPPs had prompted nuclear stalwarts to change their safety perspective towards NPPs and to frame sound policies on issues like safety culture, severe accident prevention and mitigation. An effective OE program, besides correcting current/potential problems, help in proactively improving the NPP design, operating and maintenance procedures, practices, training, etc., and thus plays vital role in ensuring safe and efficient operation of NPPs. Further it enhances knowledge with regard to equipment operating characteristics, system performance trends and provides data for quantitative and qualitative safety analysis. Besides all above, an OE program inculcates a learning culture in the organisation and thus helps in continuously enhancing the expertise, technical competency and knowledge base of its staff. Nuclear and Radiation Facilities in India are regulated by Atomic Energy Regulatory Board (AERB). Operating Plants Safety Division (OPSD) of AERB is involved in managing operating experience activities. This paper provides insights about the operating experience program of OPSD, AERB (including its on-line data base namely OPSD STAR) and its utilisation in improving the regulations and safety at Indian NPPs/projects. (author)

  13. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  14. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  15. New operator's console recorder

    International Nuclear Information System (INIS)

    Anon.

    2009-01-01

    This article described a software module that automatically records images being shown on multiple HMI or SCADA operator's displays. Videos used for monitoring activities at industrial plants can be combined with the operator console videos and data from a process historian. This enables engineers, analysts or investigators to see what is occurring in the plant, what the operator is seeing on the HMI screen, and all relevant real-time data from an event. In the case of a leak at a pumping station, investigators could watch plant video taken at a remote site showing fuel oil creeping across the floor, real-time data being acquired from pumps, valves and the receiving tank while the leak is occurring. The video shows the operator's HMI screen as well as the alarm screen that signifies the leak detection. The Longwatch Operator's Console Recorder and Video Historian are used together to acquire data about actual plant plant management because they show everything that happens during an event. The Console Recorder automatically retrieves and replays operator displays by clicking on a time-based alarm or system message. Play back of video feed is a valuable tool for training and analysis purposes, and can help mitigate insurance and regulatory issues by eliminating uncertainty and conjecture. 1 fig.

  16. Repository operational criteria analysis

    International Nuclear Information System (INIS)

    Hageman, J.P.; Chowdhury, A.H.

    1992-08-01

    The objective of the ''Repository Operational Criteria (ROC) Feasibility Studies'' (or ROC task) was to conduct comprehensive and integrated analyses of repository design, construction, and operations criteria in 10 CFR Part 60 regulations, considering the interfaces and impacts of any potential changes to those regulations. The study addresses regulatory criteria related to the preclosure aspects of the geologic repository. The study task developed regulatory concepts or potential repository operational criteria (PROC) based on analysis of a repository's safety functions and other regulations for similar facilities. These regulatory concepts or PROC were used as a basis to assess the sufficiency and adequacy of the current criteria in 10 CFR Part 60. Where the regulatory concepts were same as current operational criteria, these criteria were referenced. The operations criteria referenced or the PROC developed are given in this report. Detailed analyses used to develop the regulatory concepts and any necessary PROC for those regulations that may require a minor change are also presented. The results of the ROC task showed a need for further analysis and possible major rule change related to the design bases of a geologic repository operations area, siting, and radiological emergency planning

  17. Pipeline system operability review

    Energy Technology Data Exchange (ETDEWEB)

    Eriksson, Kjell [Det Norske Veritas (Norway); Davies, Ray [CC Technologies, Dublin, OH (United States)

    2005-07-01

    Pipeline operators are continuously working to improve the safety of their systems and operations. In the US both liquid and gas pipeline operators have worked with the regulators over many years to develop more systematic approaches to pipeline integrity management. To successfully manage pipeline integrity, vast amounts of data from different sources needs to be collected, overlaid and analyzed in order to assess the current condition and predict future degradation. The efforts undertaken by the operators has had a significant impact on pipeline safety, nevertheless, during recent years we have seen a number of major high profile accidents. One can therefore ask how effective the pipeline integrity management systems and processes are. This paper will present one methodology 'The Pipeline System Operability Review' that can evaluate and rate the effectiveness of both the management systems and procedures, as well as the technical condition of the hardware. The result from the review can be used to compare the performance of different pipelines within one operating company, as well as benchmark with international best practices. (author)

  18. Mission operations technology

    Science.gov (United States)

    Varsi, Giulio

    In the last decade, the operation of a spacecraft after launch has emerged as a major component of the total cost of the mission. This trend is sustained by the increasing complexity, flexibility, and data gathering capability of the space assets and by their greater reliability and consequent longevity. The trend can, however, be moderated by the progressive transfer of selected functions from the ground to the spacecraft and by application, on the ground, of new technology. Advances in ground operations derive from the introduction in the mission operations environment of advanced microprocessor-based workstations in the class of a few million instructions per second and from the selective application of artificial intelligence technology. In the last few years a number of these applications have been developed, tested in operational settings and successfully demonstrated to users. Some are now being integrated in mission operations facilities. An analysis of mission operations indicates that the key areas are: concurrent control of multiple missions; automated/interactive production of command sequences of high integrity at low cost; automated monitoring of spacecraft health and automated aides for fault diagnosis; automated allocation of resources; automated processing of science data; and high-fidelity, high-speed spacecraft simulation. Examples of major advances in selected areas are described.

  19. Operation guide device

    International Nuclear Information System (INIS)

    Oohashi, Hideaki.

    1982-01-01

    Purpose: To enable a reactor operator to perform safety and sure inspection for a reactor and take manual start-up operations for the necessary systems at optimum timing with neither misoperation nor misjudging after the occurrence of reactor accidents. Constitution: If a signal judging circuit judges the generation of an accident signal for a reactor, the circuit issues an output signal to start the time counting operation of a time counter thereby inform the elapse of time after the occurrence of the reactor accident. Further, a time signal generated on every predetermined time from the time counter and a process signal indicating the reactor status are logically judged and, if the conditions for taking manual start-up operations, are satisfied, a start-up instruction signal is generated. An information signal is formed depending on the start-up instruction and the content of the start-up instruction is displayed on every predetermined time by the information signal, whereby the operator can perform the manual start-up operations at the optimum timings. (Moriyama, K.)

  20. Reactor operational transient analysis

    International Nuclear Information System (INIS)

    Shin, W.K.; Chae, S.K.; Han, K.I.; Yang, K.S.; Chung, H. D.; Kim, H.G.; Moon, H.J.; Ryu, Y.H.

    1983-01-01

    To build up efficient capability of safety review and inspection for the nuclear power plants, four area of studies have performed as follows: 1) In order to search the most optimized operating method during load follow operating schemes, automatic control and normal control, are compared each other under the CAOC condition. The analysis performed by DDID code has shown that the reactor has to be controlled by the operator manually during load follow operation. 2) Through the sensitivity analysis by COBRA code, the operating parameters, such as coolant pressure, flow rate, inlet temperature, and power distribution are shown to be important to the determination of DNBR. Expecially, inlet temperature of primary coolant system is appeared as the most senstive parameter on DNBR. 3) FRAPCON code is adapted to study the sensitivity of several operational parameters on the mechanical properties of reactor fuel rod. 4) The calculations procedure which is required to be obtained the neutron fluence at the reactor vessel and the spectrum at the surveillance capsule is established. The results of computation are conpared with those of FSAR and SWRI report and proved its applicability to reactor surveillance program. (Author)

  1. Thermal Operating Modes

    International Nuclear Information System (INIS)

    Bechtel SAIC Company

    2002-01-01

    Higher and lower temperature operating modes (e.g., above and below the boiling point of water) are alternative approaches to managing the heat produced by the radioactive decay of spent nuclear fuel. Current analyses indicate that a repository at the Yucca Mountain site is likely to comply with applicable safety standards regardless of the particular thermal operating mode. Both modes have potential advantages and disadvantages. With a higher temperature operating mode (HTOM), waste packages (WPs) can be placed closer together. This reduces the number of drifts, the required emplacement area, construction costs, and occupational risks to construction workers. In addition, the HTOM would minimize the amount of water that might contact the waste for hundreds of years after closure. On the other hand, higher temperatures introduce uncertainties in the understanding of the long-term performance of the repository because of uncertainties in the thermal effects on WP lifetime and the near-field environment around the drifts. A lower temperature operating mode (LTOM) has the potential to reduce uncertainties in long-term performance of the repository by limiting the effects of temperature on WP lifetime and on the near-field environment around the drifts. Depending on the combination of operating parameters, a LTOM could require construction of additional drifts, a larger emplacement area, increased construction costs, increased occupational risks to construction works, and a longer period of ventilation than a HTOM. The repository design for the potential Yucca Mountain site is flexible and can be constructed and operated in various operating modes to achieve specific technical objectives, accommodate future policy decisions, and use of new information. For example, the flexible design can be operated across a range of temperatures and can be tailored to achieve specific thermal requirements in the future. To accommodate future policy decisions, the repository can be

  2. Dialing long distance : communications to northern operations like the MGP require sophisticated satellite networks for voice, data

    Energy Technology Data Exchange (ETDEWEB)

    Cook, D.

    2006-04-15

    Telecommunications will play a major role in the construction of the Mackenzie Gas Project due to the remoteness of its location and the volume of communication data required to support the number of people involved and the amount of construction activity. While suppliers for communications tools have not yet been identified, initial telecommunications plans call for the installation of communication equipment at all camps, major facility sites and construction locations. Equipment will be housed in self-contained, climate-controlled buildings called telecommunication service modules (TSMs), which will be connected to each other as well as to existing public communications networks. The infrastructure will support telephone and fax systems; Internet and electronic mail services; multiple channel very high frequency radios; air-to-ground communication at airstrips and helipads; ship-to-shore at barge landings; closed circuit television; satellite community antenna television; CBC radio broadcast; public address systems; security systems; and supervisory control and data acquisition (SCADA) systems. An Internet Protocol (IP) network with a voice telephone system will be implemented along with a geostationary orbit satellite network. Satellite servers and real-time data services will be used. Car kits that allow call and battery-operated self-contained telemetry devices designed to communicate via a satellite system have been commissioned for the project that are capable of providing cost-efficient and reliable asset tracking and fleet management in remote regions and assisting in deployment requirements. It was concluded that many of today's mega-projects are the driving factors behind new telecommunications solutions in remote areas. 1 fig.

  3. Operational Dynamic Configuration Analysis

    Science.gov (United States)

    Lai, Chok Fung; Zelinski, Shannon

    2010-01-01

    Sectors may combine or split within areas of specialization in response to changing traffic patterns. This method of managing capacity and controller workload could be made more flexible by dynamically modifying sector boundaries. Much work has been done on methods for dynamically creating new sector boundaries [1-5]. Many assessments of dynamic configuration methods assume the current day baseline configuration remains fixed [6-7]. A challenging question is how to select a dynamic configuration baseline to assess potential benefits of proposed dynamic configuration concepts. Bloem used operational sector reconfigurations as a baseline [8]. The main difficulty is that operational reconfiguration data is noisy. Reconfigurations often occur frequently to accommodate staff training or breaks, or to complete a more complicated reconfiguration through a rapid sequence of simpler reconfigurations. Gupta quantified a few aspects of airspace boundary changes from this data [9]. Most of these metrics are unique to sector combining operations and not applicable to more flexible dynamic configuration concepts. To better understand what sort of reconfigurations are acceptable or beneficial, more configuration change metrics should be developed and their distribution in current practice should be computed. This paper proposes a method to select a simple sequence of configurations among operational configurations to serve as a dynamic configuration baseline for future dynamic configuration concept assessments. New configuration change metrics are applied to the operational data to establish current day thresholds for these metrics. These thresholds are then corroborated, refined, or dismissed based on airspace practitioner feedback. The dynamic configuration baseline selection method uses a k-means clustering algorithm to select the sequence of configurations and trigger times from a given day of operational sector combination data. The clustering algorithm selects a simplified

  4. Using fractional order method to generalize strengthening generating operator buffer operator and weakening buffer operator

    OpenAIRE

    Wu, L.; Liu, S.; Yang, Yingjie

    2016-01-01

    Traditional integer order buffer operator is extended to fractional order buffer operator, the corresponding relationship between the weakening buffer operator and the strengthening buffer operator is revealed. Fractional order buffer operator not only can generalize the weakening buffer operator and the strengthening buffer operator, but also realize tiny adjustment of buffer effect. The effectiveness of GM(1,1) with the fractional order buffer operator is validated by six cases.

  5. Upgrade of reactor operation technology

    International Nuclear Information System (INIS)

    Itoh, Hideaki; Suzuki, Toshiaki; O-kawa, Toshikatsu

    2003-01-01

    To improve operational reliability and availability, the operation technology for a fast reactor was developed in the ''JOYO''. This report describes the upgrading of the simulator, plant operation management tools and fuel handling system for the MK-III core operation. The simulator was modified to the MK-III version to verify operation manuals, and to train operators in MK-III operation. The plant operation management tool was replaced on the operation experience to increase the reliability and efficiency of plant management works relating to plant operation and maintenance. To shorten the refueling period, the fuel handling system was upgraded to full automatic remote control. (author)

  6. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  7. Operator representations of frames

    DEFF Research Database (Denmark)

    Christensen, Ole; Hasannasab, Marzieh

    2017-01-01

    of the properties of the operator T requires more work. For example it is a delicate issue to obtain a representation with a bounded operator, and the availability of such a representation not only depends on the frame considered as a set, but also on the chosen indexing. Using results from operator theory we show......The purpose of this paper is to consider representations of frames {fk}k∈I in a Hilbert space ℋ of the form {fk}k∈I = {Tkf0}k∈I for a linear operator T; here the index set I is either ℤ or ℒ0. While a representation of this form is available under weak conditions on the frame, the analysis...... that by embedding the Hilbert space ℋ into a larger Hilbert space, we can always represent a frame via iterations of a bounded operator, composed with the orthogonal projection onto ℋ. The paper closes with a discussion of an open problem concerning representations of Gabor frames via iterations of a bounded...

  8. Automated emergency operating procedures

    International Nuclear Information System (INIS)

    Perez-Ramirez, G.; Nelson, P.F.

    1990-01-01

    This paper describes the development of a training tool for the symptom oriented emergency operating procedures used at the Laguna Verde Nuclear Power Plant. EOPs and operator training are intended to assist the operator for managing accident situations. A prototype expert system based on the EOPs has been developed for operator training. The demonstration expert system was developed using a commercial shell. The knowledge base consists of two parts. The specific operator actions to be executed for 5 selected accident sequences and the EOPs steps for the reactor pressure vessel control of the water level, pressure, and power. The knowledge is expressed in the form of IF-THEN production rules. A typical training session will display a set of conditions and will prompt the trainee to indicate the appropriate step to perform. This mode will guide the trainee through selected accident sequences. A second mode of the expert system will prompt the trainee for the current plant conditions and the expert system will respond with the EOPs which are required to be performed under these conditions. This allows the trainee to study What if situations

  9. ITER-FEAT operation

    International Nuclear Information System (INIS)

    Shimomura, Y.; Huget, M.; Mizoguchi, T.; Murakami, Y.; Polevoi, A.; Shimada, M.; Aymar, R.; Chuyanov, V.; Matsumoto, H.

    2001-01-01

    ITER is planned to be the first fusion experimental reactor in the world operating for research in physics and engineering. The first 10 years' operation will be devoted primarily to physics issues at low neutron fluence and the following 10 years' operation to engineering testing at higher fluence. ITER can accommodate various plasma configurations and plasma operation modes such as inductive high Q modes, long pulse hybrid modes, non-inductive steady-state modes, with large ranges of plasma current, density, beta and fusion power, and with various heating and current drive methods. This flexibility will provide an advantage for coping with uncertainties in the physics database, in studying burning plasmas, in introducing advanced features and in optimizing the plasma performance for the different programme objectives. Remote sites will be able to participate in the ITER experiment. This concept will provide an advantage not only in operating ITER for 24 hours per day but also in involving the world-wide fusion communities and in promoting scientific competition among the Parties. (author)

  10. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units are provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  11. Aging and operation results

    International Nuclear Information System (INIS)

    Chaussade, J.P.

    1984-01-01

    The correlation between the different accelerated aging methods and operation reality has to be done with solid and representative elements in matter of tests as well as in operating experience. In 1990 in France, the first unit will be 13 years operating, there will be 34 units of 900 MW PWR and 18 units of 1300 MW PWR in operation. The total of experience will be equivalent to 400 reactor-years. Only computerised means permit to collect all corresponding events, to manage them and to draw a lot of conclusions. One describes these computerised applications explaining the different events collected, data input and interrogating possibilities. The first application, called ''events file'', records all important events in nuclear plants. For each of these events, an event reporting format is set up as soon as first informations are known and then is put into the file. An updating is performed when the event is better known and analyzed. Interrogating programs allow no specialist to access easily to this data bank. So it is possible to collect events of the same nature, of the same equipments or of the same systems. The second application called S.R.D.F. (fiability data bank system) collects all maintenance operations on certain mechanical and electrical equipment. These two computerized applications complete on another in the way they allow to do fiability and availability studies for some equipments or for some elements of a nuclear plant [fr

  12. ITER-FEAT operation

    International Nuclear Information System (INIS)

    Shimomura, Y.; Huguet, M.; Mizoguchi, T.; Murakami, Y.; Polevoi, A.R.; Shimada, M.; Aymar, R.; Chuyanov, V.A.; Matsumoto, H.

    2001-01-01

    ITER is planned to be the first fusion experimental reactor in the world operating for research in physics and engineering. The first ten years of operation will be devoted primarily to physics issues at low neutron fluence and the following ten years of operation to engineering testing at higher fluence. ITER can accommodate various plasma configurations and plasma operation modes, such as inductive high Q modes, long pulse hybrid modes and non-inductive steady state modes, with large ranges of plasma current, density, beta and fusion power, and with various heating and current drive methods. This flexibility will provide an advantage for coping with uncertainties in the physics database, in studying burning plasmas, in introducing advanced features and in optimizing the plasma performance for the different programme objectives. Remote sites will be able to participate in the ITER experiment. This concept will provide an advantage not only in operating ITER for 24 hours a day but also in involving the worldwide fusion community and in promoting scientific competition among the ITER Parties. (author)

  13. Radioastron flight operations

    Science.gov (United States)

    Altunin, V. I.; Sukhanov, K. G.; Altunin, K. R.

    1993-01-01

    Radioastron is a space-based very-long-baseline interferometry (VLBI) mission to be operational in the mid-90's. The spacecraft and space radio telescope (SRT) will be designed, manufactured, and launched by the Russians. The United States is constructing a DSN subnet to be used in conjunction with a Russian subnet for Radioastron SRT science data acquisition, phase link, and spacecraft and science payload health monitoring. Command and control will be performed from a Russian tracking facility. In addition to the flight element, the network of ground radio telescopes which will be performing co-observations with the space telescope are essential to the mission. Observatories in 39 locations around the world are expected to participate in the mission. Some aspects of the mission that have helped shaped the flight operations concept are: separate radio channels will be provided for spacecraft operations and for phase link and science data acquisition; 80-90 percent of the spacecraft operational time will be spent in an autonomous mode; and, mission scheduling must take into account not only spacecraft and science payload constraints, but tracking station and ground observatory availability as well. This paper will describe the flight operations system design for translating the Radioastron science program into spacecraft executed events. Planning for in-orbit checkout and contingency response will also be discussed.

  14. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  15. About APPLE II Operation

    International Nuclear Information System (INIS)

    Schmidt, T.; Zimoch, D.

    2007-01-01

    The operation of an APPLE II based undulator beamline with all its polarization states (linear horizontal and vertical, circular and elliptical, and continous variation of the linear vector) requires an effective description allowing an automated calculation of gap and shift parameter as function of energy and operation mode. The extension of the linear polarization range from 0 to 180 deg. requires 4 shiftable magnet arrrays, permitting use of the APU (adjustable phase undulator) concept. Studies for a pure fixed gap APPLE II for the SLS revealed surprising symmetries between circular and linear polarization modes allowing for simplified operation. A semi-analytical model covering all types of APPLE II and its implementation will be presented

  16. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1990-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  17. Simulators for NPP operators

    International Nuclear Information System (INIS)

    Yuzhakov, A.Yu.

    2010-01-01

    The author reports on the application of full-scale simulators for training and maintaining proficiency of unit control room operators that is an essential element of Russian NPPs personnel education system. The existing simulators for the unit control room operating personnel are listed. The integrated approach to developing and maintaining the training hardware is described. The integrated approach is being implemented on the basis of observance of the existing requirements to training hardware, improvement of regulations, control from a single centre responsible for the provision of support to the activities, inclusion into the plans of simulators for development of skills for operating control over equipment and systems, as well as control from local boards [ru

  18. Theory of linear operations

    CERN Document Server

    Banach, S

    1987-01-01

    This classic work by the late Stefan Banach has been translated into English so as to reach a yet wider audience. It contains the basics of the algebra of operators, concentrating on the study of linear operators, which corresponds to that of the linear forms a1x1 + a2x2 + ... + anxn of algebra.The book gathers results concerning linear operators defined in general spaces of a certain kind, principally in Banach spaces, examples of which are: the space of continuous functions, that of the pth-power-summable functions, Hilbert space, etc. The general theorems are interpreted in various mathematical areas, such as group theory, differential equations, integral equations, equations with infinitely many unknowns, functions of a real variable, summation methods and orthogonal series.A new fifty-page section (``Some Aspects of the Present Theory of Banach Spaces'''') complements this important monograph.

  19. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  20. ORNL radioactive waste operations

    International Nuclear Information System (INIS)

    Sease, J.D.; King, E.M.; Coobs, J.H.; Row, T.H.

    1982-01-01

    Since its beginning in 1943, ORNL has generated large amounts of solid, liquid, and gaseous radioactive waste material as a by-product of the basic research and development work carried out at the laboratory. The waste system at ORNL has been continually modified and updated to keep pace with the changing release requirements for radioactive wastes. Major upgrading projects are currently in progress. The operating record of ORNL waste operation has been excellent over many years. Recent surveillance of radioactivity in the Oak Ridge environs indicates that atmospheric concentrations of radioactivity were not significantly different from other areas in East Tennesseee. Concentrations of radioactivity in the Clinch River and in fish collected from the river were less than 4% of the permissible concentration and intake guides for individuals in the offsite environment. While some radioactivity was released to the environment from plant operations, the concentrations in all of the media sampled were well below established standards

  1. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  2. International co-operation

    International Nuclear Information System (INIS)

    1997-01-01

    In 1996, Nuclear Regulatory Authority of the Slovak Republic (NRA SR) ensured the Slovak Republic (SR) obligations with relation to the international agreements and with the SR membership in the IAEA.International co-operation has been ensured on the basis of the bilateral international agreements. With the Ministry of Foreign Affairs co-operation, the SR fulfilled its financial obligations to this organization in due time and in the full scope. Representing Central and Eastern Europe interest in the Board of Governors, the SR participation in the highest executive in the highest executive authority was finished in 1996.The Board of Governors Vice-chairman position was executed by NRA SR Chairman. 5 national and 6 regional technical co-operation and assistance projects were realized in 1996. 12 organizations participated in these projects and accordingly 104 experts took part in training programmes, scientific visits or as the mission members abroad. Besides, Slovak experts participated at work of technical advisory and consultation groups with the significant assistance. In the framework of IAEA co-operation, the SR was visited by 11 expert missions formed by 28 experts from 19 countries including IAEA. Slovak organizations, namely institutes of the Academy of Sciences, Slovak research centres and universities participated in IAEA scientific and research activities through NRA SR. 15 scientific contracts in total were approved and realized and these contracts are utilized as supplementary financing of the own scientific and research projects. Other international co-operation and regional co-operation activities of the NRA SR in 1996 are reviewed

  3. GNF2 Operating Experience

    International Nuclear Information System (INIS)

    Schardt, John

    2007-01-01

    GNF's latest generation fuel product, GNF2, is designed to deliver improved nuclear efficiency, higher bundle and cycle energy capability, and more operational flexibility. But along with high performance, our customers face a growing need for absolute fuel reliability. This is driven by a general sense in the industry that LWR fuel reliability has plateaued. Too many plants are operating with fuel leakers, and the impact on plant operations and operator focus is unacceptable. The industry has responded by implementing an INPO-coordinated program aimed at achieving leaker-free reliability by 2010. One focus area of the program is the relationship between fuel performance (i.e., duty) and reliability. The industry recognizes that the right balance between performance and problem-free fuel reliability is critical. In the development of GNF2, GNF understood the requirement for a balanced solution and utilized a product development and introduction strategy that specifically addressed reliability: evolutionary design features supported by an extensive experience base; thoroughly tested components; and defense-in-depth mitigation of all identified failure mechanisms. The final proof test that the balance has been achieved is the application of the design, initially through lead use assemblies (LUAs), in a variety of plants that reflect the diversity of the BWR fleet. Regular detailed surveillance of these bundles provides the verification that the proper balance between performance and reliability has been achieved. GNF currently has GNF2 lead use assemblies operating in five plants. Included are plants that have implemented extended power up-rates, plants on one and two-year operating cycles, and plants with and without NobleChem TM and zinc injection. The leading plant has undergone three pool-side inspections outages to date. This paper reviews the actions taken to insure GNF2's reliability, and the lead use assembly surveillance data accumulated to date to validate

  4. SSCL Commissioning and Operations

    International Nuclear Information System (INIS)

    1992-01-01

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  5. The operation and maintenance manual

    International Nuclear Information System (INIS)

    Klein, W.; Krotil, H.; Stoll, A.

    1975-01-01

    The Operating Manual is one of many technical documents which the nuclear power plant operator needs for ensuring safe operation. For the operating staff, however, there is only one document, namely the Operating Manual. It contains, appropriately arranged, the necessary system and other diagrams, drawings, lists, licensing documents and similar material, which are necessary for understanding the design, for testing, for obtaining the operating licence and for the operation of individual systems and of the entire plant. (orig./RW) [de

  6. Piping engineering and operation

    International Nuclear Information System (INIS)

    1993-01-01

    The conference 'Piping Engineering and Operation' was organized by the Institution of Mechanical Engineers in November/December 1993 to follow on from similar successful events of 1985 and 1989, which were attended by representatives from all sectors of the piping industry. Development of engineering and operation of piping systems in all aspects, including non-metallic materials, are highlighted. The range of issues covered represents a balance between current practices and implementation of future international standards. Twenty papers are printed. Two, which are concerned with pressurized pipes or steam lines in the nuclear industry, are indexed separately. (Author)

  7. TRIGA reactor operating experience

    International Nuclear Information System (INIS)

    Anderson, T.V.

    1970-01-01

    The Oregon State TRIGA Reactor (OSTR) has been in operation 3 years. Last August it was upgraded from 250 kW to 1000 kW. This was accomplished with little difficulty. During the 3 years of operation no major problems have been experienced. Most of the problems have been minor in nature and easily corrected. They came from lazy susan (dry bearing), Westronics Recorder (dead spots in the range), The Reg Rod Magnet Lead-in Circuit (a new type lead-in wire that does not require the lead-in cord to coil during rod withdrawal hss been delivered, much better than the original) and other small corrections

  8. Topics in Operator Theory

    CERN Document Server

    Ball, Joseph A; Helton, JWilliam; Rodman, Leiba; Spitkovsky, Iiya

    2010-01-01

    This is the first volume of a collection of original and review articles on recent advances and new directions in a multifaceted and interconnected area of mathematics and its applications. It encompasses many topics in theoretical developments in operator theory and its diverse applications in applied mathematics, physics, engineering, and other disciplines. The purpose is to bring in one volume many important original results of cutting edge research as well as authoritative review of recent achievements, challenges, and future directions in the area of operator theory and its applications.

  9. Operational Design for Peace Enforcement: Lessons for the Operational Staff

    National Research Council Canada - National Science Library

    Neumann, Michael

    2004-01-01

    U.S. involvement in Somalia serves as a useful case study of the unique challenges an operational staff may face when applying operational design to the planning and execution of a peace enforcement operation. U.S...

  10. Systemic Operational Design: Enhancing the Joint Operation Planning Process

    National Research Council Canada - National Science Library

    Delacruz, Victor J

    2007-01-01

    Operational level commanders and their staffs require relevant and current joint doctrine that articulates the critical function of operational design and its role in the Joint Operation Planning Process (JOPP...

  11. Seminar 1. Joint Military Operations. Application of the Operational Reserve

    National Research Council Canada - National Science Library

    Copp, A

    1997-01-01

    .... As a means of achieving decisive effect at the operational level of war, the operational reserve should be considered an operational function and should be addressed as both a planning element...

  12. The operation and maintenance manual

    International Nuclear Information System (INIS)

    Stoll, A.; Krotil, H.; Klein, W.

    1976-01-01

    The operating manual is one of many technical documents which the nuclear power plant operator needs for ensuring safe operation. For the operating staff, however, there is only one document, namely the operating manual. The operating manual is an essential element in bringing man and machine in harmony. This is necessary for safe and, as far as possible, uninterrupted operation of the power plant. The operating manual is the only document containing binding instructions for plant operation. All the tasks of plant operation which are carried out by plant staff are described in the operating manual in a form which is as clear and comprehensible as possible. A considerable number of these tasks can only be carried out by man, namely: 1) tasks concerning operational organization, 2) all non-automated areas of plant operation. (orig./TK) [de

  13. Cyber Operations Virtual Environment

    Science.gov (United States)

    2010-09-01

    capability independent of the operator’s willingness to make target responses (See, Macmillan & Creelman , 1991; Parasuraman, Masalonis, & Hancock, 2000...Ma, K-L. (2004). Visualization for security. Computer Graphics, 38, 4-6. Macmillan, N. A., & Creelman , C. D. (1991). Detection theory: A user’s

  14. Mission operations management

    Science.gov (United States)

    Rocco, David A.

    1994-01-01

    Redefining the approach and philosophy that operations management uses to define, develop, and implement space missions will be a central element in achieving high efficiency mission operations for the future. The goal of a cost effective space operations program cannot be realized if the attitudes and methodologies we currently employ to plan, develop, and manage space missions do not change. A management philosophy that is in synch with the environment in terms of budget, technology, and science objectives must be developed. Changing our basic perception of mission operations will require a shift in the way we view the mission. This requires a transition from current practices of viewing the mission as a unique end product, to a 'mission development concept' built on the visualization of the end-to-end mission. To achieve this change we must define realistic mission success criteria and develop pragmatic approaches to achieve our goals. Custom mission development for all but the largest and most unique programs is not practical in the current budget environment, and we simply do not have the resources to implement all of our planned science programs. We need to shift our management focus to allow us the opportunity make use of methodologies and approaches which are based on common building blocks that can be utilized in the space, ground, and mission unique segments of all missions.

  15. Operator/contractor relationships

    International Nuclear Information System (INIS)

    Smith, J.R.; Kidwell, C.K.; Unger, V.E.; Fercho, E.; Helmer, C.M.

    1992-01-01

    In May 1988, Shell Western E and P Inc. (SWEPI) and partners Elf Aquitaine Petroleum and Conoco Inc. signed a letter of intent with Canadian Marine Drilling Ltd. (Canmar) for provision of exploratory drilling and marine services on leases in OCS Lease Sale 109 in the Chukchi Sea, Alaska. The 5450 blocks offered in the remote sale area west of Point Barrow ranged from 3 to 240 miles (5 to 380 km) offshore in water depths from 26 to 263 feet (8 to 80 m). The principal interest tracts were at least 75 miles (120 km) offshore and north of 70 degrees N latitude. The remoteness and total lack of any oilfield infrastructure required considerable planning and coordination between Operator and Contractor in order to carry out the three-year drilling program efficiently and safely in an environmentally harsh and, at the same time, sensitive area. SWEPI and Canmar developed a close working relationship from the start of the project through a number of participative approaches to the problems that had to be solved. This paper reports that these included strong reliance on operational planning meetings, post-season analyses, and an overall emphasis on the teamwork required of both parties to carry out the first-ever drilling program in the Chukchi Sea. This approach led to a very successful operation for both parties and emphasizes the positive benefits achievable when Operator and Contractor work as a team

  16. Operations research and development

    African Journals Online (AJOL)

    The paper begins with a discussion of the concepts “operations research” .... have in common an emphasis on the “scientific” and quantitative aspects of .... It is important to ensure that the MCDA methodologies are sufficiently simple and .... 2006, is an excellent example of the application of OR techniques to a topic with.

  17. Operating US power reactors

    International Nuclear Information System (INIS)

    Silver, E.G.

    1988-01-01

    This update, which appears regularly in each issue of Nuclear Safety, surveys the operations of those power reactors in the US which have been issued operating licenses. Table 1 shows the number of such reactors and their net capacities as of September 30, 1987, the end of the three-month period covered in this report. Table 2 lists the unit capacity and forced outage rate for each licensed reactor for each of the three months (July, August, and September 1987) covered in this report and the cumulative values of these parameters since the beginning of commercial operation. In addition to the tabular data, this article discusses other significant occurrences and developments that affected licensed US power reactors during this reporting period. Status changes at Braidwood Unit 1, Nine Mile Point 2, and Beaver Valley 2 are discussed. Other occurrences discussed are: retraining of control-room operators at Peach Bottom; a request for 25% power for Shoreham, problems at Fermi 2 which delayed the request to go to 75% power; the results of a safety study of the N Reactor at Hanford; a proposed merger of Pacific Gas and Electric with Sacramento Municipal Utility District which would result in the decommissioning of Rancho Seco; the ordered shutdown of Oyster Creek; a minor radioactivity release caused by a steam generator tube rupture at North Anna 1; and 13 fines levied by the NRC on reactor licensees

  18. Cutback for grid operators

    International Nuclear Information System (INIS)

    Meulmeester, P.; De Laat, J.

    2006-01-01

    The Netherlands Competition Authority (NMa), in which the Office of Energy Regulation (DTe) is included plan to decrease the capital cost compensation (or weighted average cost of capital or WACC) for grid operators. In this article it is explained how the compensation is calculated, why this measure will be taken and what the effects of this cutback are [nl

  19. Snow-clearing operations

    CERN Multimedia

    EN Department

    2010-01-01

    To facilitate snow clearing operations, which commence at 4.30 in the morning, all drivers of CERN cars are kindly requested to park them together in groups. This will help us greatly assist us in our work. Thank-you for your help. Transport Group / EN-HE Tel. 72202

  20. Splunk operational intelligence cookbook

    CERN Document Server

    Diakun, Josh; Mock, Derek

    2014-01-01

    This book is intended for users of all levels who are looking to leverage the Splunk Enterprise platform as a valuable operational intelligence tool. The recipes provided in this book will appeal to individuals from all facets of a business - IT, Security, Product, Marketing, and many more!

  1. Global Operations Coevolution

    DEFF Research Database (Denmark)

    Slepniov, Dmitrij; Wæhrens, Brian Vejrum; Gubi, Ebbe

    2013-01-01

    Companies are actively seeking competitive advantage through their choice of location and ownership of operations. The purpose of this chapter is to uncover hidden effects of this development and propose how companies can respond to them. The chapter draws on a case study of a Danish industrial e...... of analysis and involving temporal adaptations. In terms of managerial implications, the study provides managers with lessons for designing a robust system of globally dispersed operations.......Companies are actively seeking competitive advantage through their choice of location and ownership of operations. The purpose of this chapter is to uncover hidden effects of this development and propose how companies can respond to them. The chapter draws on a case study of a Danish industrial...... equipment firm and describes how its operations configuration has been changing over time. The chapter identifies the key determinants of this change and uncovers some of its hidden effects. The chapter closes with propositions for how to respond to these effects through the development of a distinct...

  2. Resilient Grid Operational Strategies

    Energy Technology Data Exchange (ETDEWEB)

    Pasqualini, Donatella [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-03-01

    Extreme weather-related disturbances, such as hurricanes, are a leading cause of grid outages historically. Although physical asset hardening is perhaps the most common way to mitigate the impacts of severe weather, operational strategies may be deployed to limit the extent of societal and economic losses associated with weather-related physical damage.1 The purpose of this study is to examine bulk power-system operational strategies that can be deployed to mitigate the impact of severe weather disruptions caused by hurricanes, thereby increasing grid resilience to maintain continuity of critical infrastructure during extreme weather. To estimate the impacts of resilient grid operational strategies, Los Alamos National Laboratory (LANL) developed a framework for hurricane probabilistic risk analysis (PRA). The probabilistic nature of this framework allows us to estimate the probability distribution of likely impacts, as opposed to the worst-case impacts. The project scope does not include strategies that are not operations related, such as transmission system hardening (e.g., undergrounding, transmission tower reinforcement and substation flood protection) and solutions in the distribution network.

  3. [Lateral epicondylitis: conservative - operative].

    Science.gov (United States)

    Altintas, Burak; Greiner, Stefan

    2016-10-01

    Lateral epicondylitis is a common disease of the common extensor origin at the lateral humerus. Despite its common self-limitation it can lead to chronic therapy-resistant pain with remarkable functional disability of the affected arm. Different conservative and operative treatment options of lateral epicondylitis are described and compared regarding benefits and risks. Additionally, recent surgical techniques and their complications are mentioned. Based on the current literature, it is shown which treatment option can be recommended. This review was based on the literature analysis in PubMed regarding "conservative and operative therapy of lateral epicondylitis" as well as the clinical experience of the authors. Conservative treatment is the primary choice for the treatment of lateral epicondylitis if concomitant pathologies such as instability among others can be excluded. It should include strengthening against resistance with eccentric stretching of the extensor group. In persistent cases, operative treatment is warranted. Resection of the pathologic tissue at the extensor origin with debridement and refixation of the healthy tendinous tissue yields good results. Most patients with lateral epicondylitis can be treated conservatively with success. Radiological evaluation should be performed in therapy-resistant cases. In the case of partial or complete rupture of the extensor origin, operative therapy is indicated.

  4. Operational risk assessment.

    Science.gov (United States)

    McKim, Vicky L

    2017-06-01

    In the world of risk management, which encompasses the business continuity disciplines, many types of risk require evaluation. Financial risk is most often the primary focus, followed by product and market risks. Another critical area, which typically lacks a thorough review or may be overlooked, is operational risk. This category encompasses many risk exposure types including those around building structures and systems, environmental issues, nature, neighbours, clients, regulatory compliance, network, data security and so on. At times, insurance carriers will assess internal hazards, but seldom do these assessments include more than a cursory look at other types of operational risk. In heavily regulated environments, risk assessments are required but may not always include thorough assessments of operational exposures. Vulnerabilities may linger or go unnoticed, only to become the catalyst for a business disruption at a later time, some of which are so severe that business recovery becomes nearly impossible. Businesses may suffer loss of clients as the result of a prolonged disruption of services. Comprehensive operational risk assessments can assist in identifying such vulnerabilities, exposures and threats so that the risk can be minimised or removed. This paper lays out how an assessment of this type can be successfully conducted.

  5. Distributed Operating Systems

    NARCIS (Netherlands)

    Mullender, Sape J.

    1987-01-01

    In the past five years, distributed operating systems research has gone through a consolidation phase. On a large number of design issues there is now considerable consensus between different research groups. In this paper, an overview of recent research in distributed systems is given. In turn, the

  6. Space Operations Learning Center

    Science.gov (United States)

    Lui, Ben; Milner, Barbara; Binebrink, Dan; Kuok, Heng

    2012-01-01

    The Space Operations Learning Center (SOLC) is a tool that provides an online learning environment where students can learn science, technology, engineering, and mathematics (STEM) through a series of training modules. SOLC is also an effective media for NASA to showcase its contributions to the general public. SOLC is a Web-based environment with a learning platform for students to understand STEM through interactive modules in various engineering topics. SOLC is unique in its approach to develop learning materials to teach schoolaged students the basic concepts of space operations. SOLC utilizes the latest Web and software technologies to present this educational content in a fun and engaging way for all grade levels. SOLC uses animations, streaming video, cartoon characters, audio narration, interactive games and more to deliver educational concepts. The Web portal organizes all of these training modules in an easily accessible way for visitors worldwide. SOLC provides multiple training modules on various topics. At the time of this reporting, seven modules have been developed: Space Communication, Flight Dynamics, Information Processing, Mission Operations, Kids Zone 1, Kids Zone 2, and Save The Forest. For the first four modules, each contains three components: Flight Training, Flight License, and Fly It! Kids Zone 1 and 2 include a number of educational videos and games designed specifically for grades K-6. Save The Forest is a space operations mission with four simulations and activities to complete, optimized for new touch screen technology. The Kids Zone 1 module has recently been ported to Facebook to attract wider audience.

  7. South African Airborne Operations

    African Journals Online (AJOL)

    South Africa carried out numerous airborne operations during the latter part .... It was a lesson the French had learned and were learning in Indo-China and ..... South African government, concerned that the conflict would spill across their northern border, ...... the Super Frelon and it was an outstanding helicopter at sea level.

  8. Averaging operations on matrices

    Indian Academy of Sciences (India)

    2014-07-03

    Jul 3, 2014 ... Role of Positive Definite Matrices. • Diffusion Tensor Imaging: 3 × 3 pd matrices model water flow at each voxel of brain scan. • Elasticity: 6 × 6 pd matrices model stress tensors. • Machine Learning: n × n pd matrices occur as kernel matrices. Tanvi Jain. Averaging operations on matrices ...

  9. Almost periodic Schroedinger operators

    International Nuclear Information System (INIS)

    Bellissard, J.; Lima, R.

    1984-01-01

    These lectures are devoted to recent developments in the theory of almost-periodic Schroedinger Operators. We specially describe the algebraic point of view, with applications to gap-labelling theorems. Particular models are also presented which exhibit various spectral properties. (orig.)

  10. Electromagnetically Operated Counter

    Science.gov (United States)

    Goldberg, H D; Goldberg, M I

    1951-12-18

    An electromagnetically operated counter wherein signals to be counted are applied to cause stepwise rotation of a rotatable element which is connected to a suitable register. The mechanism involved consists of a rotatable armature having three spaced cores of magnetic material and a pair of diametrically opposed electromagnets with a suitable pulsing circuit to actuate the magnets.

  11. Dam safety operating guidelines

    International Nuclear Information System (INIS)

    Elsayed, E.; Leung, T.; Kirkham, A.; Lum, D.

    1990-01-01

    As part of Ontario Hydro's dam structure assessment program, the hydraulic design review of several river systems has revealed that many existing dam sites, under current operating procedures, would not have sufficient discharge capacity to pass the Inflow Design Flood (IDF) without compromising the integrity of the associated structures. Typical mitigative measures usually considered in dealing with these dam sites include structural alterations, emergency action plans and/or special operating procedures designed for extreme floods. A pilot study was carried out for the Madawaska River system in eastern Ontario, which has seven Ontario Hydro dam sites in series, to develop and evaluate the effectiveness of the Dam Safety Operating Guidelines (DSOG). The DSOG consist of two components: the flood routing schedules and the minimum discharge schedules, the former of which would apply in the case of severe spring flood conditions when the maximum observed snowpack water content and the forecast rainfall depth exceed threshold values. The flood routing schedules would identify to the operator the optimal timing and/or extent of utilizing the discharge facilities at each dam site to minimize the potential for dam failures cased by overtopping anywhere in the system. It was found that the DSOG reduced the number of structures overtopped during probable maximum flood from thirteen to four, while the number of structures that could fail would be reduced from seven to two. 8 refs., 4 figs., 3 tabs

  12. Operations and Modeling Analysis

    Science.gov (United States)

    Ebeling, Charles

    2005-01-01

    The Reliability and Maintainability Analysis Tool (RMAT) provides NASA the capability to estimate reliability and maintainability (R&M) parameters and operational support requirements for proposed space vehicles based upon relationships established from both aircraft and Shuttle R&M data. RMAT has matured both in its underlying database and in its level of sophistication in extrapolating this historical data to satisfy proposed mission requirements, maintenance concepts and policies, and type of vehicle (i.e. ranging from aircraft like to shuttle like). However, a companion analyses tool, the Logistics Cost Model (LCM) has not reached the same level of maturity as RMAT due, in large part, to nonexistent or outdated cost estimating relationships and underlying cost databases, and it's almost exclusive dependence on Shuttle operations and logistics cost input parameters. As a result, the full capability of the RMAT/LCM suite of analysis tools to take a conceptual vehicle and derive its operations and support requirements along with the resulting operating and support costs has not been realized.

  13. The Operations Process

    Science.gov (United States)

    2010-03-26

    important events receive the most attention. Ensures that absentees and flank units receive changes to the operation order. Transmits changes to them...York: Vintage Books, 1991. Fuller, J. F. C. Generalship: Its Diseases and Their Cure . Harrisburg, PA: Military Service Publishing Co., 1936

  14. Manually operated coded switch

    International Nuclear Information System (INIS)

    Barnette, J.H.

    1978-01-01

    The disclosure related to a manually operated recodable coded switch in which a code may be inserted, tried and used to actuate a lever controlling an external device. After attempting a code, the switch's code wheels must be returned to their zero positions before another try is made

  15. Operation C O P

    Science.gov (United States)

    Mueck, Robert P.; Parker, Ashley

    2011-01-01

    Sometimes one never knows what sparks an idea or causes people to come together and take something forward. An example of this is Operation COP at the University of Maryland in College Park. Their version of the "See Something, Say Something" campaign is being touted as a crime prevention program, while it is at the same time an…

  16. Invariant differential operators

    CERN Document Server

    Dobrev, Vladimir K

    2016-01-01

    With applications in quantum field theory, elementary particle physics and general relativity, this two-volume work studies invariance of differential operators under Lie algebras, quantum groups, superalgebras including infinite-dimensional cases, Schrödinger algebras, applications to holography. This first volume covers the general aspects of Lie algebras and group theory.

  17. Teachers and Operant Conditioning.

    Science.gov (United States)

    Frey, Sherman

    A survey was conducted of 406 elementary, middle, and secondary school teachers to determine their understanding, acceptance, and use of the principle of operant conditioning. The treatment of data was by percent and chi square analysis primarily according to sex, experience, degree, and position. Subjects reported that a) they believed that the…

  18. Operant Conditioning - Token Economy.

    Science.gov (United States)

    Montgomery, Jacqueline; McBurney, Raymond D.

    Described is an Operant Conditioning-Token Economy Program, teaching patients to be responsible for their own behavior, to make choices, and to be motivated to change. The program was instigated with mentally ill patients in a state hospital and was later used with institutionalized mentally handicapped groups. After two years, only four of the…

  19. Invariant differential operators

    CERN Document Server

    Dobrev, Vladimir K

    With applications in quantum field theory, elementary particle physics and general relativity, this two-volume work studies invariance of differential operators under Lie algebras, quantum groups, superalgebras including infinite-dimensional cases, Schrödinger algebras, applications to holography. This first volume covers the general aspects of Lie algebras and group theory.

  20. Operational Area Environmental Evaluations

    Energy Technology Data Exchange (ETDEWEB)

    Bailey-White, Brenda Eileen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Nagy, Michael David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Wagner, Katrina Marie [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Goodman, Thomas Richard [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Herring, Allen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Catechis, Christopher S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Kinghorn, Aubrianna Nicole [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Johnson, Ellie [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Barthel, Michael David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Casaus, Benito [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    The Operational Area Environmental Evaluation update provides a description of activities that have the potential to adversely affect natural and cultural resources, including soil, air, water, biological, ecological, and historical resources. The environmental sensitivity of an area is evaluated and summarized, which may facilitate informed management decisions as to where development may be prohibited, restricted, or subject to additional requirements.

  1. International co-operation

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities in international co-operation carried out by the Nuclear power plants Jaslovske Bohunice in 1997 is presented. Professionality of the Bohunice NPPs staff was highly appreciated by inviting them to be the OSART team members

  2. FFTF operator training

    International Nuclear Information System (INIS)

    1979-01-01

    The qualifications required and the training received by FFTF operators are described. The training includes sodium fill training and cold plant qualification. Requirements for supervisors are also outlined. Arrangement of personnel at FFTF is described. Requalification training and recertification are considered

  3. Marketing co-operatives

    NARCIS (Netherlands)

    G.W.J. Hendrikse (George); C.P. Veerman (Cees)

    2000-01-01

    textabstractMarketing co-operatives (MCs) are analysed from an incomplete contracting perspective. The requirement of the domination of control by the members of a MC is a threat to the survival of a MC in markets where the level of asset specificity at the processing stage of production is

  4. Monitoring of operating processes

    International Nuclear Information System (INIS)

    Barry, R.F.

    1981-01-01

    Apparatus is described for monitoring the processes of a nuclear reactor to detect off-normal operation of any process and for testing the monitoring apparatus. The processes are evaluated by response to their paramters, such as temperature, pressure, etc. The apparatus includes a pair of monitoring paths or signal processing units. Each unit includes facilities for receiving on a time-sharing basis, a status binary word made up of digits each indicating the status of a process, whether normal or off-normal, and test-signal binary words simulating the status binary words. The status words and test words are processed in succession during successive cycles. During each cycle, the two units receive the same status word and the same test word. The test words simulate the status words both when they indicate normal operation and when they indicate off-normal operation. Each signal-processing unit includes a pair of memories. Each memory receives a status word or a test word, as the case may be, and converts the received word into a converted status word or a converted test word. The memories of each monitoring unit operate into a non-coincidence which signals non-coincidence of the converted word out of one memory of a signal-processing unit not identical to the converted word of the other memory of the same unit

  5. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2015-01-01

    This paper investigates sales and operations planning (S&OP) at four Scandinavian industrial food producers in order to explore how the use of S&OP might help leaders to deal with the challenges set by the planning environment. Variables connected to the product and market, e.g., frequency of new...

  6. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...

  7. Operational Amplifer Integrator

    NARCIS (Netherlands)

    van Tuijl, Adrianus Johannes Maria

    2003-01-01

    An integrator circuit comprises an operational amplifier which has a transistor stage (1) with an input terminal (4) and an output terminal (3), a feedback capacitor (2) connected between the input terminal (4) and the output terminal (3), and a resistor (5) connected to the input terminal (4), and

  8. On commuting operator exponentials, II

    Indian Academy of Sciences (India)

    where N is an unbounded normal operator and M is a bounded normal operator in the. Hilbert space. Keywords. Self-adjoint and normal operator; commuting normal operator exponent- ials; Borel functional calculus. 1. Introduction. Let E be a complex Hilbert space and let B(E) be the algebra of bounded linear operators.

  9. Effectiveness of operation tools developed by KEKB operators

    International Nuclear Information System (INIS)

    Sugino, K.; Satoh, Y.; Kitabayashi, T.

    2004-01-01

    The main tasks of KEKB (High Energy Accelerator Research Organization B-physics) operators are beam tuning and injection, operation logging, monitoring of accelerator conditions and safety management. New beam tuning methods are frequently applied to KEKB in order to accomplish high luminosity. In such a situation, various operation tools have been developed by the operators to realize efficient operation. In this paper, we describe effectiveness of tools developed by the operators. (author)

  10. PSA in operator training

    International Nuclear Information System (INIS)

    Nos, V.; Faig, J.; Plesa, P.; Delgado, J. L.

    2000-01-01

    The systematic approach to training is internationally accepted as the best method to achieve and maintain the qualification and competence of power plant personnel and to guarantee the quality of their training. Following the recommendations and guidelines of international organisations competent in the field, TECNATOM SA has developed projects based on the systematic approach to training for all Spanish nuclear power plants. One of the latest projects was the systematic approach to training developed for the operation personnel of ASCO Nuclear Power Plant. In this case, certain results of the Probabilistic Safety Analysis (PSA) which complement the systematic safety and reliability criteria of the systematic approach to training process have been incorporated in the traditional processes of work and task analysis and training plan design. This incorporation provides the training manager with additional criteria based not only on safety aspects obtained through the statistical treatment of considerations of skilled technical personnel (operators, operation chief supervisors, etc), but also on the independent criterion of the PSA. The inclusion of this approach basically affects all systematics in two of its stages: During the selection process of operating practices in SMR or SGI, the possible scenarios have been associated with all those situations where human actions which lead to an initiating event or human actions to mitigate an initiating event, may take place, as defined in the PSA. During the scenario development process, the instruments involved in the performance of human actions which originate or mitigate an event taking place have been identified. This pakes it possible to reconcile the scenario event sequence with the sequence considered in the PSA study, as the most likely to provoke a more serious accident. The incorporation of these PSA results contributes to the strengthening of safety aspects in training in an objective way, and confirms that

  11. Cohering power of quantum operations

    Energy Technology Data Exchange (ETDEWEB)

    Bu, Kaifeng, E-mail: bkf@zju.edu.cn [School of Mathematical Sciences, Zhejiang University, Hangzhou 310027 (China); Kumar, Asutosh, E-mail: asukumar@hri.res.in [Harish-Chandra Research Institute, Chhatnag Road, Jhunsi, Allahabad 211019 (India); Homi Bhabha National Institute, Anushaktinagar, Mumbai 400094 (India); Zhang, Lin, E-mail: linyz@zju.edu.cn [Institute of Mathematics, Hangzhou Dianzi University, Hangzhou 310018 (China); Wu, Junde, E-mail: wjd@zju.edu.cn [School of Mathematical Sciences, Zhejiang University, Hangzhou 310027 (China)

    2017-05-18

    Highlights: • Quantum coherence. • Cohering power: production of quantum coherence by quantum operations. • Study of cohering power and generalized cohering power, and their comparison for differentmeasures of quantum coherence. • Operational interpretation of cohering power. • Bound on cohering power of a generic quantum operation. - Abstract: Quantum coherence and entanglement, which play a crucial role in quantum information processing tasks, are usually fragile under decoherence. Therefore, the production of quantum coherence by quantum operations is important to preserve quantum correlations including entanglement. In this paper, we study cohering power–the ability of quantum operations to produce coherence. First, we provide an operational interpretation of cohering power. Then, we decompose a generic quantum operation into three basic operations, namely, unitary, appending and dismissal operations, and show that the cohering power of any quantum operation is upper bounded by the corresponding unitary operation. Furthermore, we compare cohering power and generalized cohering power of quantum operations for different measures of coherence.

  12. Density operators in quantum mechanics

    International Nuclear Information System (INIS)

    Burzynski, A.

    1979-01-01

    A brief discussion and resume of density operator formalism in the way it occurs in modern physics (in quantum optics, quantum statistical physics, quantum theory of radiation) is presented. Particularly we emphasize the projection operator method, application of spectral theorems and superoperators formalism in operator Hilbert spaces (Hilbert-Schmidt type). The paper includes an appendix on direct sums and direct products of spaces and operators, and problems of reducibility for operator class by using the projection operators. (author)

  13. Regulations for RA reactor operation

    International Nuclear Information System (INIS)

    1980-09-01

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions [sr

  14. Weakly compact operators and interpolation

    OpenAIRE

    Maligranda, Lech

    1992-01-01

    The class of weakly compact operators is, as well as the class of compact operators, a fundamental operator ideal. They were investigated strongly in the last twenty years. In this survey, we have collected and ordered some of this (partly very new) knowledge. We have also included some comments, remarks and examples. The class of weakly compact operators is, as well as the class of compact operators, a fundamental operator ideal. They were investigated strongly in the last twenty years. I...

  15. Efficient boiler operations sourcebook

    Energy Technology Data Exchange (ETDEWEB)

    Payne, F.W. (comp.)

    1985-01-01

    This book emphasizes the practical aspects of industrial and commercial boiler operations. It starts with a comprehensive review of general combustion and boiler fundamentals and then deals with specific efficiency improvement methods, and the cost savings which result. The book has the following chapter headings: boiler combustion fundamentals; boiler efficiency goals; major factors controlling boiler efficiency; boiler efficiency calculations; heat loss; graphical solutions; preparation for boiler testing; boiler test procedures; efficiency-related boiler maintenance procedures; boiler tune-up; boiler operational modifications; effect of water side and gas side scale deposits; load management; auxillary equipment to increase boiler efficiency; air preheaters and economizers; other types of auxillary equipment; combustion control systems and instrumentation; boiler O/sub 2/ trim controls; should you purchase a new boiler.; financial evaluation procedures; case studies. The last chapter includes a case study of a boiler burning pulverized coal and a case study of stoker-fired coal.

  16. Ship operations report, 1973

    International Nuclear Information System (INIS)

    1973-01-01

    The NOAA Fleet Operations Report 1973 was developed to provide a summary of project accomplishments during calendar year 1973. The report was prepared from season, cruise and special reports submitted by ships of the fleet. Centralized management of the NOAA Fleet was finalized by changing the operational control of the National Marine Fisheries Service (NMFS) Ships DAVID STARR JORDAN (FRS 44), TOWNSEND CROMWELL (FRS 43) and MURRE II (FRV 63) from NMFS to the National Ocean Survey on July 1, 1973. Throughout the year, ships routinely collected and transmitted weather data. Similarly, as NOAA participants in the Integrated Global Ocean Station System (IGOSS) service program, XBT observations were taken and either radioed or submitted in log form via mail. In addition, particulate and radionuclide samples were taken in cooperation with the Atomic Energy Commission, sediment samples were obtained for the Smithsonian Institution and observations were made of marine mammals

  17. ATLAS IBL operational experience

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00237659; The ATLAS collaboration

    2017-01-01

    The Insertable B-Layer (IBL) is the inner most pixel layer in the ATLAS experiment, which was installed at 3.3 cm radius from the beam axis in 2014 to improve the tracking performance. To cope with the high radiation and hit occupancy due to proximity to the interaction point, a new read-out chip and two different silicon sensor technologies (planar and 3D) have been developed for the IBL. After the long shut-down period over 2013 and 2014, the ATLAS experiment started data-taking in May 2015 for Run-2 of the Large Hadron Collider (LHC). The IBL has been operated successfully since the beginning of Run-2 and shows excellent performance with the low dead module fraction, high data-taking efficiency and improved tracking capability. The experience and challenges in the operation of the IBL is described as well as its performance.

  18. Tevatron lower temperature operation

    International Nuclear Information System (INIS)

    Theilacker, J.C.

    1994-07-01

    This year saw the completion of three accelerator improvement projects (AIP) and two capital equipment projects pertaining to the Tevatron cryogenic system. The projects result in the ability to operate the Tevatron at lower temperature, and thus higher energy. Each project improves a subsystem by expanding capabilities (refrigerator controls), ensuring reliability (valve box, subatmospheric hardware, and compressor D), or enhancing performance (cold compressors and coldbox II). In January of 1994, the Tevatron operated at an energy of 975 GeV for the first time. This was the culmination, of many years of R ampersand D, power testing in a sector (one sixth) of the Tevatron, and final system installation during the summer of 1993. Although this is a modest increase in energy, the discovery potential for the Top quark is considerably improved

  19. Train operation in emergencies

    CERN Document Server

    Jia, Limin; Qin, Yong

    2017-01-01

    This book presents the latest findings on train operation theories and methods in the context of emergencies. It examines and assesses a range of aspects—including the definition of a railway emergency, transport organization modes in emergencies, calculating railway transport capacity in emergencies, line planning in emergencies, train re-pathing in emergencies and train re-scheduling in emergencies—that are urgently needed in the railway transportation field, which faces the serious challenge of dealing with emergencies worldwide. The book highlights the latest research results in an integrated and systematic way, and the methodology presented is oriented on real-world problems, allowing it to be used not only directly in railway operational management, but also as the point of departure for further applications or theoretical research. As such, the book will be of considerable interest to graduate students and researchers in the field of traffic and transportation engineering.>.

  20. SAGD operating strategies

    Energy Technology Data Exchange (ETDEWEB)

    Nasr, T. N.; Golbeck, H.; Korpany, G.; Pierce, G. [Alberta Research Council, Edmonton, AB (Canada)

    1998-12-31

    Steam-assisted gravity drainage (SAGD) has become one of the most effective means of recovering oil from oil sands deposits that are too deeply buried for surface mining. In general terms, the process involves drilling paired horizontal wells, one well above the other, and separated by a distance, near the bottom of the oil-bearing formation. The top well is used to inject the steam, heating up the oil and allowing it to drain under the action of gravity, into the bottom well. This paper reviews advances in SAGD operating strategies, based on work at the Underground Test Facility (UTF) in Alberta. Problems that continue to challenge researchers and operators, and concepts to overcome these challenges are discussed in terms of laboratory studies at UTF, designed to improve SAGD oil-to-steam ratios and to reduce water requirements for the process. 8 refs., 20 figs.

  1. Financing Canadian international operations

    International Nuclear Information System (INIS)

    Beagle, G.

    1996-01-01

    A primer on financing international operations by Canadian corporations was provided. Factors affecting the availability to project finance (location, political risk), the various forms of financing (debt, equity, and combinations), the main sources of government backed financing to corporations (the International Finance Corporation) (IFC), the European Bank for Reconstruction and Development (EBRD), the Asian Development Bank (ADB), the Overseas Property Insurance Corporation (OPIC), government or agency guarantees, political risk coverage, the use of offshore financial centres, and the where, when and how these various organizations operate, were reviewed. Examples of all of the above, taken from the experiences of Canadian Occidental Petroleum of Calgary in the U.S., in South America, in the Middle and Far East, and in Kazakhstan, were used as illustrations. figs

  2. Economical motor transport operations

    Energy Technology Data Exchange (ETDEWEB)

    Cooke, P

    1979-09-01

    Motor transport is one area in a company where energy conservation is a function primarily of operative education and motivation rather than mechanical or technical control and monitoring. Unless the driver wants to save energy by proper operation of the vehicle, there is nothing the company can do to force him, whatever equipment it fits to the vehicles, or incentives it offers. This article gives an overview of the use of energy in road transport and examines a number of actions that can be taken to conserve energy. It discusses the question of the cost-effectiveness of transport energy conservation in the light of the complex issues involved. The problems and opportunities of implementing energy-saving programs are examined. (MCW)

  3. Operational and environmental safety

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The responsibility of the DOE Office of Operational and Environmental Safety is to assure that DOE-controlled activities are conducted in a manner that will minimize risks to the public and employees and will provide protection for property and the environment. The program supports the various energy technologies by identifying and resolving safety problems; developing and issuing safety policies, standards, and criteria; assuring compliance with DOE, Federal, and state safety regulations; and establishing procedures for reporting and investigating accidents in DOE operations. Guidelines for the radiation protection of personnel; radiation monitoring at nuclear facilities; an assessment of criticality accidents by fault tree analysis; and the preparation of environmental, safety, and health standards applicable to geothermal energy development are discussed

  4. Hurricane slams gulf operations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that reports of damage by Hurricane Andrew escalated last week as operators stepped up inspections of oil and gas installations in the Gulf of Mexico. By midweek, companies operating in the gulf and South Louisiana were beginning to agree that earlier assessments of damage only scratched the surface. Damage reports included scores of lost, toppled, or crippled platforms, pipeline ruptures, and oil slicks. By midweek the U.S. coast Guard had received reports of 79 oil spills. Even platforms capable of resuming production in some instances were begin curtailed because of damaged pipelines. Offshore service companies the another 2-4 weeks could be needed to fully assess Andrew's wrath. Lack of personnel and equipment was slowing damage assessment and repair

  5. 8. The operational processes.

    Science.gov (United States)

    2014-05-01

    There are two principal directions that disaster studies pursue: (1) interventional; and (2) noninterventional. Interventional studies are used to evaluate specific responses as to their effectiveness in meeting their respective objectives, their contribution to the overarching goal, the efficiency with which they are able to achieve their objectives, other effects created, and their respective costs. On the other hand, noninterventional studies examine the epidemiology of disasters and for the most part are observational. Both interventional and noninterventional studies require data/information obtained from assessments. This section of these Guidelines examines the operational framework used to study interventions/responses and includes the following processes: (1) assessments, (2) identification of needs; (3) strategic planning; (4) selection of intervention(s); (5) operational planning; (6) execution of interventions; and (7) monitoring and evaluation of effects and changes in levels of functions resulting from the intervention(s) being studied.

  6. Airline Operations Aid

    Science.gov (United States)

    1993-01-01

    C Language Integrated Production System (CLIPS), a NASA-developed expert systems program, is used by American Airlines for three purposes: as a rapid prototyping tool; to develop production prototypes; and to develop production application. An example of the latter is CLIPS' use in "Hub S1AAshing," a knowledge based system that recommends contingency plans when severe schedule reductions must be made. Hub S1AAshing has replaced a manual, labor intensive process. It saves time and allows Operations Control Coordinators to handle more difficult situations. Because the system assimilates much of the information necessary to facilitate educated decision making, it minimizes negative impact in situations where it is impossible to operate all flights.

  7. Operation Unified Protector

    DEFF Research Database (Denmark)

    Buhl, Kenneth Øhlenschlæger

    2012-01-01

    Formålet med denne artikel er at se nærmere på erfaringerne fra den maritime kampagne under den militære indsats i konflikten i Libyen i 2011, som i NATO regi blev kendt som Operation Unified Protector (OUP). Dækningen i de danske medier fokuserede primært på luftkampagnen, hvilket må tilskrives,...

  8. Preparation to exceptional operations

    International Nuclear Information System (INIS)

    Sort, M.

    1984-01-01

    Preparation to special maintenance operations requires a specific approach according to the considered intervention type. Replacement of vapor generators is representative of a kind of intervention where technics is generally only an adaptation to the power plant context of processes already in application in construction, and where methodology, planning and organization have an important role because of the variety and the quantity of taskworks to be done, the involved manpower, the dosimetry and time lag requirements [fr

  9. Nuclear operations dictionary

    International Nuclear Information System (INIS)

    1990-01-01

    In less than fifty years, a sophisticated technical language has developed worldwide around broad-ranging operations in the field of nuclear technology. In South Africa the need to adapt this new technical language in an orderly and acceptable manner for common use was identified. The aim of this dictionary is to promote the use of correct nuclear technology in both English and Afrikaans, and to aid in the translation of nuclear terms from English into Afrikaans

  10. Nuclear operations dictionary

    International Nuclear Information System (INIS)

    1990-01-01

    In less than fifty years, a sophisticated technical language has developed worldwide around broad-ranging operations in the field of nuclear technology. In South Africa the need to adapt this new technical language in an orderly and acceptable manner for common use was identified. The aim of this dictionary is to promote the use of correct nuclear terminology in both Afrikaans and English, and to aid in the translation of nuclear terms from Afrikaans into English

  11. SAF line powder operations

    International Nuclear Information System (INIS)

    Frederickson, J.R.; Horgos, R.M.

    1983-10-01

    An automated nuclear fuel fabrication line is being designed for installation in the Fuels and Materials Examination Facility (FMEF) near Richland, Washington. The fabrication line will consist of seven major process systems: Receiving and Powder Preparation; Powder Conditioning; Pressing and Boat Loading; Debinding, Sintering, and Property Adjustment; Boat Transport; Pellet Inspection and Finishing; and Pin Operations. Fuel powder processing through pellet pressing will be discussed in this paper

  12. Pressurised water reactor operation

    International Nuclear Information System (INIS)

    Birnie, S.; Lamonby, J.K.

    1987-01-01

    The operation of a pressurized water reactor (PWR) is described with respect to the procedure for a unit start-up. The systems details and numerical data are for a four loop PWR station of the design proposed for Sizewell-'B', United Kingdom. A description is given of: the initial conditions, filling the reactor coolant system (RCS), heat-up and pressurisation of the RCS, secondary system preparations, reactor start-up, and reactivity control at power. (UK)

  13. Operational electricity transmission rates

    International Nuclear Information System (INIS)

    Roggen, M.

    1997-01-01

    In a liberalized electricity market both the consumers and the producers of electricity must pay for the use of the power transmission network. Thus, the net manager has unlimited options to realize efficiency improvements. A neutral and transparent management of the power grid is necessary to avoid disturbance of the market. KEMA Consulting translated abstract ideas and strategic advices to operational concepts in its report 'A framework for the determination of tariffs of the transport in the Dutch electricity sector'

  14. Operational Shock Complexity Theory

    Science.gov (United States)

    2005-05-26

    Theory : Recommendations For The National Strategy To Defeat Terrorism.” Student Issue Paper, Center for Strategic Leadership , US Army War College, July...Lens of Complexity Theory : Recommendations For The National Strategy To Defeat Terrorism.” (Student Issue Paper, Center for Strategic Leadership , US...planners managed to cause confusion in the enemy’s internal model by operating in an unexpected manner. 140 Glenn E. James, “Chaos Theory : The

  15. Rotorwash Operational Footprint Modeling

    Science.gov (United States)

    2014-07-01

    I-13. Francis, J. K., and Gillespie, A., “Relating Gust Speed to Tree Damage in Hurricane Hugo , 1989,” Journal of Arboriculture, November 1993...statement has been Rotorwash Operational Footprint Modeling 72 found to be correct. In many parts of the United States, the requirements for hurricane ...On August 18, 1983, Hurricane Alicia struck downtown Houston, Texas. Researchers were allowed into downtown Houston the following day to help survey

  16. ELIXIR Handbook of Operations

    OpenAIRE

    Niklas Blomberg; Martin Cook; Pablo Roman Garcia; Stephanie Suhr; Premysl Velek; Montserrat Gonzalez; Susanna Repo

    2017-01-01

    ELIXIR is a distributed infrastructure, built around existing centres of excellence throughout the European member states represented through national Nodes, and incorporating the internationally supported European Bioinformatics Institute (EMBL-EBI). There are currently over 160 institutes from 20 member states taking part in ELIXIR. Operating a large, distributed, ‘virtual’ organisation such as ELIXIR requires strong coordination capabilities with clear roles and effective and simple proces...

  17. Magnetically operated check valve

    Science.gov (United States)

    Morris, Brian G.; Bozeman, Richard J., Jr.

    1994-06-01

    A magnetically operated check valve is disclosed. The valve is comprised of a valve body and a movable poppet disposed therein. A magnet attracts the poppet to hold the valve shut until the force of fluid flow through the valve overcomes the magnetic attraction and moves the poppet to an unseated, open position. The poppet and magnet are configured and disposed to trap a magnetically attracted particulate and prevent it from flowing to a valve seating region.

  18. Education Payload Operation - Demonstrations

    Science.gov (United States)

    Keil, Matthew

    2009-01-01

    Education Payload Operation - Demonstrations (EPO-Demos) are recorded video education demonstrations performed on the International Space Station (ISS) by crewmembers using hardware already onboard the ISS. EPO-Demos are videotaped, edited, and used to enhance existing NASA education resources and programs for educators and students in grades K-12. EPO-Demos are designed to support the NASA mission to inspire the next generation of explorers.

  19. Energy operations policy

    International Nuclear Information System (INIS)

    1993-01-01

    It is reported that energy policy was designed following the European Bank for Reconstruction and Development review of the most pressing energy issues confronting Central and Eastern Europe and the republics of the former Soviet Union. The main features of the policy described in the document set the general framework for the Bank's energy operations. Energy strategies for particular countries are designed as an integral part of the Bank's individual country strategies. Tabs

  20. Peri-operative care.

    Science.gov (United States)

    Baston, Helen

    2004-05-01

    This is the third 'midwifery basics' series aimed at student midwives, and focuses on midwifery care during labour. This article provides a summary of peri-operative care for women who experience caesarean birth. Students are encouraged to seek further information through a series of activities, and to link theory with practice by considering the issues relating to the care of the woman described in the short vignette.

  1. Operator ordering and causality

    OpenAIRE

    Plimak, L. I.; Stenholm, S. T.

    2011-01-01

    It is shown that causality violations [M. de Haan, Physica 132A, 375, 397 (1985)], emerging when the conventional definition of the time-normal operator ordering [P.L.Kelley and W.H.Kleiner, Phys.Rev. 136, A316 (1964)] is taken outside the rotating wave approximation, disappear when the amended definition [L.P. and S.S., Annals of Physics, 323, 1989 (2008)] of this ordering is used.

  2. Oscillators and operational amplifiers

    OpenAIRE

    Lindberg, Erik

    2005-01-01

    A generalized approach to the design of oscillators using operational amplifiers as active elements is presented. A piecewise-linear model of the amplifier is used so that it make sense to investigate the eigenvalues of the Jacobian of the differential equations. The characteristic equation of the general circuit is derived. The dynamic nonlinear transfer characteristic of the amplifier is investigated. Examples of negative resistance oscillators are discussed.

  3. FFTF operational experience

    International Nuclear Information System (INIS)

    Newland, D.J.; Krupar, J.J.

    1984-01-01

    In April 1982, the FFTF began its first nominally 100 day irradiation cycle. Since that time the plant has operated very well with steadily increasing plant capacity factors during its first four cycles. One hundred fifty fuel assemblies (eighty of which are experiments) and over 32,000 individual fuel pins have been irradiated, some in excess of 100 MWd/Kg burnup. Specialized equipment and systems unique to sodium cooled reactor plants have performed well

  4. Gaussian operations and privacy

    International Nuclear Information System (INIS)

    Navascues, Miguel; Acin, Antonio

    2005-01-01

    We consider the possibilities offered by Gaussian states and operations for two honest parties, Alice and Bob, to obtain privacy against a third eavesdropping party, Eve. We first extend the security analysis of the protocol proposed in [Navascues et al. Phys. Rev. Lett. 94, 010502 (2005)]. Then, we prove that a generalized version of this protocol does not allow one to distill a secret key out of bound entangled Gaussian states

  5. On Major Naval Operations

    Science.gov (United States)

    2007-01-01

    operation were to take Turkey out of the war, open a direct link with the Entente’s embattled ally Russia, force the Ger- mans to shift troops from the...heavy losses. By August 1915, the allied forces amounted to twelve divisions. A new landing was conducted in early August at Suvla Bay aimed to link ...lethal weapons, such as antiship missiles and tor- pedoes , and the nature of the physical environment. Here again, combat be- tween modern naval forces

  6. 2015 Special Operations Essays

    Science.gov (United States)

    2015-05-01

    this emerging technology, but how to operate within it as well. Figure 1. Egypt population pyramid . Source: United States Census Bureau...vital during events in Egypt in 2011. In comparing the 100 days it took to overthrow the Shah in the 1979 Iranian Revolution to the 18 days in which the...Figure 1, which is expected to continue to be seen in Egypt over the next several decades.12 The popularity of social media within this demographic was

  7. Targets of operation monitoring

    International Nuclear Information System (INIS)

    Wenger, H.

    1997-01-01

    The condition monitoring system of a nuclear power plant should be an assurance for the user and the authorities that the safety of the installation constantly corresponds to the nominal condition. As soon as deviations from these conditions occur, it should quickly provide fundamentals for corrective measures. It contributes to a high degree of availability of the installation and makes safe and economical operation throughout the whole life of the installation possible. (author) 1 fig

  8. Reactor operation method

    International Nuclear Information System (INIS)

    Osumi, Katsumi; Miki, Minoru.

    1979-01-01

    Purpose: To prevent stress corrosion cracks by decreasing the dissolved oxygen and hydrogen peroxide concentrations in the coolants within a reactor container upon transient operation such as at the start-up or shutdown of bwr type reactors. Method: After a condensate has been evacuated, deaeration operation is conducted while opening a main steam drain line, as well as a main steam separation valve and a by-pass valve in a turbine by-pass line connecting the main steam line and the condenser without by way of a turbine, and the reactor is started-up by the extraction of control rods after the concentration of dissolved oxygen in the cooling water within a pressure vessel has been decreased below a predetermined value. Nuclear heating is started after the reactor water has been increased to about 150 0 C by pump heating after the end of the deaeration operation for preventing the concentration of hydrogen peroxide and oxygen in the reactor water from temporarily increasing immediately after the start-up. The corrosive atmosphere in the reactor vessel can thus be moderated. (Horiuchi, T.)

  9. Operating experience in reprocessing

    International Nuclear Information System (INIS)

    Schueller, W.

    1983-01-01

    Since 1953, reprocessing has accumulated 180 years of operating experience in ten plants, six of them with 41 years of operation in reprocessing oxide fuel from light water reactors. After abortive, premature attempts at what is called commercial reprocessing, which had been oriented towards the market value of recoverable uranium and plutonium, non-military reprocessing technologies have proved their technical feasibility, since 1966 on a pilot scale and since 1976 on an industrial scale. Reprocessing experience obtained on uranium metal fuel with low and medium burnups can now certainly be extrapolated to oxide fuel with high burnup and from pilot plants to industrial scale plants using the same technologies. The perspectives of waste management of the nuclear power plants operated in the Federal Republic of Germany should be viewed realistically. The technical problems still to be solved are in a balanced relationship to the benefit arising to the national economy out of nuclear power generation and can be solved in time, provided there are clearcut political boundary conditions. (orig.) [de

  10. ILC Operating Scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Barklow, T.; Brau, J.; Fujii, K.; Gao, J.; List, J.; Walker, N.; Yokoya, K.; Collaboration: ILC Parameters Joint Working Group

    2015-06-15

    The ILC Technical Design Report documents the design for the construction of a linear collider which can be operated at energies up to 500 GeV. This report summarizes the outcome of a study of possible running scenarios, including a realistic estimate of the real time accumulation of integrated luminosity based on ramp-up and upgrade processes. The evolution of the physics outcomes is emphasized, including running initially at 500 GeV, then at 350 GeV and 250 GeV. The running scenarios have been chosen to optimize the Higgs precision measurements and top physics while searching for evidence for signals beyond the standard model, including dark matter. In addition to the certain precision physics on the Higgs and top that is the main focus of this study, there are scientific motivations that indicate the possibility for discoveries of new particles in the upcoming operations of the LHC or the early operation of the ILC. Follow-up studies of such discoveries could alter the plan for the centre-of-mass collision energy of the ILC and expand the scientific impact of the ILC physics program. It is envisioned that a decision on a possible energy upgrade would be taken near the end of the twenty year period considered in this report.

  11. Disc operational system

    International Nuclear Information System (INIS)

    Veretenov, V.Yu.; Volkov, A.I.; Gurevich, M.I.; Kozik, V.S.; Pod'yachev, E.I.; Shapiro, M.L.

    1974-01-01

    A disc operational system is proposed, which is based on the file structure and designed for use in a BESM-6 computer with the software system comprising a dispatcher DD-73 and a monitor 'Dubna'. The main distinguishing feature of the disc operational system is the decentralization of the file system. Each disc package is an independent file unaffected by the state of the other disc packages. The use of several disc packages is allowed. The above feature of the disc operational system makes it possible to simplify the language of communication with the system, to give the user the opportunity of controlling the file quite independently, and to simplify the maintenance of the discs by the computer personnel. One and the same disc can be simultaneously addressed by all problems in the processor (both mathematical and service). A single file, however, may be used in the recording mode by only one problem. The description presented is the instruction for users. It also describes special possibilities open to the system programmers [ru

  12. CH Packaging Operations Manual

    International Nuclear Information System (INIS)

    2008-01-01

    This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing 'Short' 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing 'Tall' 85-gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing SWB Payload Assembly; and 1.7, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence.

  13. CH Packaging Operations Manual

    International Nuclear Information System (INIS)

    2009-01-01

    This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing 'Short' 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing 'Tall' 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

  14. Operational health physics training

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-06-01

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of {alpha}, {beta}, {gamma}, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included.

  15. CH Packaging Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-05-27

    This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

  16. Reactor operation method

    International Nuclear Information System (INIS)

    Suzuki, Toshio; Hida, Kazuki; Yoshioka, Ritsuo.

    1990-01-01

    The enrichment degree of fuels initially loaded in a reactor core was made extremely lower than that of fresh fuels to be loaded in the succeeding cycle, or the enrichment degree for all of the initially loaded fuels was made identical with that of the fresh fuels in the conventional reactor operation method. In this operation method, since the initially loaded fuels are sometimes taken out after the completion of the cycle at the low burnup degree as it is, it can not be said to reduce the fuel cycle cost. As a means for dissolving this problem, at least two different kinds of initially loaded fuels are prepared. The enrichment degree of the highly enriched fuels is made identical with that of the fresh fuels, and the enrichment degree and the number of low enriched fuels are not changed after the completion of the first cycle but they are operated till the end of the second cycle. Further, all of the fuels at the low enrichment degree are taken out after the completion of the second cycle and exchanged with the fresh fuels. As a result, high burnup ratio of the initially loaded fuels can be increased, to improve the fuel economy. (I.S.)

  17. Operation and development 1999

    International Nuclear Information System (INIS)

    2001-01-01

    This issue of the Technical Report on the Accelerators describes the operations for physics experiments and beam tests, various technical improvements and ongoing projects during the year 1999. As usual, the first chapter reports on the standard operation of GANIL with stable ions, with analysis of the beam time distribution and statistics, including failures. A major project was the production and subsequent acceleration, over a long period of time, of an intense 58 Ni 11+ beam produced using the MIVOC method, which contributed strongly to the discovery of the doubly-magic 48 Ni element. The renovation and development program (Chapter 2), including methods for producing metallic ion beams, gathered speed thanks to the completion of SPIRAL. A large share of these projects were high-intensity oriented. This trend also obviously applies to projects directly linked to the THI operation. In a special test, a 1.3 x 10 13 pps 13 C beam (later raised to 2 x 10 13 pps for several hours) was accelerated and extracted from SSC2 at an energy of 75 MeV/n. Simultaneously, comparisons were made between simulations and beam test results for a clearer understanding of space charge effects on accelerator transmission efficiency. Chapter 3 covers the THI related projects. The final chapter deals with IRRSUD. This project, which is funded and on the way to completion, uses low energy beams delivered by the two injector cyclotrons for industrial applications and research, such as nano-technologies and simulation of defects in solids. (author)

  18. Waste Management Operations Program

    International Nuclear Information System (INIS)

    Sease, J.D.

    1983-01-01

    The major function of the Program is to operate the Laboratory's systems and facilities for collecting and disposing of radioactive gaseous, liquid, and solid wastes. This includes collection and shallow land burial of about 2000 m 3 of β-γ contaminated waste and retrievable storage of about 60 m 3 of transuranium contaminated waste annually; ion-exchange treatment and release to the environment of about 450 x 10 3 m 3 of slightly contaminated water; volume reduction by evaporation of about 5000 m 3 of intermediate-level liquid waste followed by hydrofracture injection of the concentrate; and scrubbing and/or filtration of the gases from radioactive operations prior to release to the atmosphere. In addition, this year disposal of about 350,000 gal of radioactive sludge from the old (no longer in service) gunite tanks began. Operations are in conformance with rules and regulations presently applicable to ORNL. This Program is responsible for planning and for development activities for upgrading the facilities, equipment, and procedures for waste disposal to ensure ORNL work incorporates the latest technology. Major (line-item) new facilities are provided as well as substantial (GPP) upgrading of old facilities. These activities as well as the technical and engineering support to handle them are discussed

  19. Operational health physics training

    International Nuclear Information System (INIS)

    1988-09-01

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of α, β, γ, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included

  20. Review of operational aids for nuclear plant operators

    International Nuclear Information System (INIS)

    Kisner, R.A.

    1983-01-01

    Many approaches are being explored to improve the safety of nuclear plant operations. One approach is to supply high-quality, relevant information by means of computer-based diagnostic systems to assist plant operators in performing their operational and safety-related roles. The evaluation of operational aids to ensure safe plant operations is a necessary function of NRC. This work has two purposes: to collect limited data on a diversity of operational aids, and to provide a method for evaluating the safety implications of the functions of proposed operational aids. After a discussion of the method evaluation now under study, this paper outlines this data collection to date

  1. Does Operational Risk Disclosure Quality Increase Operating Cash Flows?

    Directory of Open Access Journals (Sweden)

    Haitham Nobanee

    2017-12-01

    Full Text Available This study aims to measure the degree of operational risk disclosure and examine its impact on operating cash flow of banks listed on the UAE Abu Dhabi Stock Exchange (ADX and Dubai Financial Market (DFM during the period 2003-2016. The authors conducted content analysis of the annual reports to measure the degree of operational risk disclosure. In addition, they used dynamic panel data regressions to analyze the impact of operational risk disclosure on the operating cash flow generated by the banks. The results show a low degree of operational risk disclosure for all UAE banks, both Islamic and conventional. In addition, the results show no association between the levels of disclosure of operational risk and cash flow for all banks, conventional and Islamic. Operational risk disclosure of Islamic banks has not been examined by any prior researchers. In addition, this paper examines the potential impact of operational risk disclosure on the operating cash flow generated by the banks.

  2. Reactor core operation management system

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Tomomi.

    1992-05-28

    Among operations of periodical inspection for a nuclear power plant, sequence, time and safety rule, as well as necessary equipments and the number thereof required for each of the operation are determined previously for given operation plannings, relevant to the reactor core operations. Operation items relative to each of coordinates of the reactor core are retrieved and arranged based on specified conditions, to use the operation equipments effectively. Further, a combination of operations, relative to the reactor core coordinates with no physical interference and shortest in accordance with safety rules is judged, and the order and the step of the operation relevant to the entire reactor core operations are planned. After the start of the operation, the necessity for changing the operation sequence is judged depending on the judgement as to whether it is conducted according to the safety rule and the deviation between the plan and the result, based on the information for the progress of each of the operations. Alternatively, the operation sequence and the step to be changed are planned again in accordance with the requirement for the change of the operation planning. Then, the shortest operation time can be planned depending on the simultaneous operation impossible condition and the condition for the operation time zone determined by labor conditions. (N.H.).

  3. Reactor core operation management system

    International Nuclear Information System (INIS)

    Sato, Tomomi.

    1992-01-01

    Among operations of periodical inspection for a nuclear power plant, sequence, time and safety rule, as well as necessary equipments and the number thereof required for each of the operation are determined previously for given operation plannings, relevant to the reactor core operations. Operation items relative to each of coordinates of the reactor core are retrieved and arranged based on specified conditions, to use the operation equipments effectively. Further, a combination of operations, relative to the reactor core coordinates with no physical interference and shortest in accordance with safety rules is judged, and the order and the step of the operation relevant to the entire reactor core operations are planned. After the start of the operation, the necessity for changing the operation sequence is judged depending on the judgement as to whether it is conducted according to the safety rule and the deviation between the plan and the result, based on the information for the progress of each of the operations. Alternatively, the operation sequence and the step to be changed are planned again in accordance with the requirement for the change of the operation planning. Then, the shortest operation time can be planned depending on the simultaneous operation impossible condition and the condition for the operation time zone determined by labor conditions. (N.H.)

  4. CMS analysis operations

    International Nuclear Information System (INIS)

    Andreeva, J; Maier, G; Spiga, D; Calloni, M; Colling, D; Fanzago, F; D'Hondt, J; Maes, J; Van Mulders, P; Villella, I; Klem, J; Letts, J; Padhi, S; Sarkar, S

    2010-01-01

    During normal data taking CMS expects to support potentially as many as 2000 analysis users. Since the beginning of 2008 there have been more than 800 individuals who submitted a remote analysis job to the CMS computing infrastructure. The bulk of these users will be supported at the over 40 CMS Tier-2 centres. Supporting a globally distributed community of users on a globally distributed set of computing clusters is a task that requires reconsidering the normal methods of user support for Analysis Operations. In 2008 CMS formed an Analysis Support Task Force in preparation for large-scale physics analysis activities. The charge of the task force was to evaluate the available support tools, the user support techniques, and the direct feedback of users with the goal of improving the success rate and user experience when utilizing the distributed computing environment. The task force determined the tools needed to assess and reduce the number of non-zero exit code applications submitted through the grid interfaces and worked with the CMS experiment dashboard developers to obtain the necessary information to quickly and proactively identify issues with user jobs and data sets hosted at various sites. Results of the analysis group surveys were compiled. Reference platforms for testing and debugging problems were established in various geographic regions. The task force also assessed the resources needed to make the transition to a permanent Analysis Operations task. In this presentation the results of the task force will be discussed as well as the CMS Analysis Operations plans for the start of data taking.

  5. Categorizing operational radioactive wastes

    International Nuclear Information System (INIS)

    2007-04-01

    The primary objective of this publication is to improve communications among waste management professionals and Member States relative to the properties and status of radioactive waste. This is accomplished by providing a standardized approach to operational waste categorization using accepted industry practices and experience. It is a secondary objective to draw a distinction between operational waste categorization and waste disposal classification. The approach set forth herein is applicable to waste generation by mature (major, advanced) nuclear programmes, small-to-medium sized nuclear programmes, and programmes with waste from other nuclear applications. It can be used for planning, developing or revising categorization methodologies. For existing categorization programmes, the approach set forth in this publication may be used as a validation and evaluation tool for assessing communication effectiveness among affected organizations or nations. This publication is intended for use by waste management professionals responsible for creating, implementing or communicating effective categorization, processing and disposal strategies. For the users of this publication, it is important to remember that waste categorization is a communication tool. As such, the operational waste categories are not suitable for regulatory purposes nor for use in health and safety evaluations. Following Section 1 (Introduction) Section 2 of this publication defines categorization and its relationship to existing waste classification and management standards, regulations and practices. It also describes the benefits of a comprehensive categorization programme and fundamental record considerations. Section 3 provides an overview of the categorization process, including primary categories and sub-categories. Sections 4 and 5 outline the specific methodology for categorizing unconditioned and conditioned wastes. Finally, Section 6 provides a brief summary of critical considerations that

  6. Operator algebras and topology

    International Nuclear Information System (INIS)

    Schick, T.

    2002-01-01

    These notes, based on three lectures on operator algebras and topology at the 'School on High Dimensional Manifold Theory' at the ICTP in Trieste, introduce a new set of tools to high dimensional manifold theory, namely techniques coming from the theory of operator algebras, in particular C*-algebras. These are extensively studied in their own right. We will focus on the basic definitions and properties, and on their relevance to the geometry and topology of manifolds. A central pillar of work in the theory of C*-algebras is the Baum-Connes conjecture. This is an isomorphism conjecture, as discussed in the talks of Luck, but with a certain special flavor. Nevertheless, it has important direct applications to the topology of manifolds, it implies e.g. the Novikov conjecture. In the first chapter, the Baum-Connes conjecture will be explained and put into our context. Another application of the Baum-Connes conjecture is to the positive scalar curvature question. This will be discussed by Stephan Stolz. It implies the so-called 'stable Gromov-Lawson-Rosenberg conjecture'. The unstable version of this conjecture said that, given a closed spin manifold M, a certain obstruction, living in a certain (topological) K-theory group, vanishes if and only M admits a Riemannian metric with positive scalar curvature. It turns out that this is wrong, and counterexamples will be presented in the second chapter. The third chapter introduces another set of invariants, also using operator algebra techniques, namely L 2 -cohomology, L 2 -Betti numbers and other L 2 -invariants. These invariants, their basic properties, and the central questions about them, are introduced in the third chapter. (author)

  7. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  8. Operation and development 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This issue of the Technical Report on the Accelerators describes the operations for physics experiments and beam tests, various technical improvements and ongoing projects during the year 1999. As usual, the first chapter reports on the standard operation of GANIL with stable ions, with analysis of the beam time distribution and statistics, including failures. A major project was the production and subsequent acceleration, over a long period of time, of an intense {sub 58}Ni{sup 11+} beam produced using the MIVOC method, which contributed strongly to the discovery of the doubly-magic {sub 48}Ni element. The renovation and development program (Chapter 2), including methods for producing metallic ion beams, gathered speed thanks to the completion of SPIRAL. A large share of these projects were high-intensity oriented. This trend also obviously applies to projects directly linked to the THI operation. In a special test, a 1.3 x 10{sup 13} pps {sub 13}C beam (later raised to 2 x 10{sup 13} pps for several hours) was accelerated and extracted from SSC2 at an energy of 75 MeV/n. Simultaneously, comparisons were made between simulations and beam test results for a clearer understanding of space charge effects on accelerator transmission efficiency. Chapter 3 covers the THI related projects. The final chapter deals with IRRSUD. This project, which is funded and on the way to completion, uses low energy beams delivered by the two injector cyclotrons for industrial applications and research, such as nano-technologies and simulation of defects in solids. (author)

  9. Dukovany NPP operation

    International Nuclear Information System (INIS)

    Vlcek, Jaroslav

    2010-01-01

    The topics discussed include: Dukovany NPP among CEZ Group power plants; International missions at the plant; Plant operation results; and Strategic goals and challenges. Historical data are presented in the graphical form, such as the unit capacity factor, unplanned capability loss factor, unplanned automatic scrams, fuel reliability, industrial safety accident rate, collective radiation exposure, WANO index, power generation data, and maximum achievable power by the end of year. Also discussed were the company culture and human resources, maintenance, power uprate, and related phenomena. (P.A.)

  10. Playing in Operations Management

    Directory of Open Access Journals (Sweden)

    Laura Guitart-Tarrés

    2017-06-01

    Full Text Available The current model of competency-based learning requires new tools that allow students to develop these competencies and become active subjects of their learning (rather than passive receivers of a contents. Gamification or ludification is becoming an innovative trend in many areas, also in higher education. Games can provide a useful environment for students to acquire professional skills, a fact that is much more difficult to acquire through traditional learning methods. In that sense, this paper presents the experience of designing a game for Operations Management students.

  11. Revamping Spacecraft Operational Intelligence

    Science.gov (United States)

    Hwang, Victor

    2012-01-01

    The EPOXI flight mission has been testing a new commercial system, Splunk, which employs data mining techniques to organize and present spacecraft telemetry data in a high-level manner. By abstracting away data-source specific details, Splunk unifies arbitrary data formats into one uniform system. This not only reduces the time and effort for retrieving relevant data, but it also increases operational visibility by allowing a spacecraft team to correlate data across many different sources. Splunk's scalable architecture coupled with its graphing modules also provide a solid toolset for generating data visualizations and building real-time applications such as browser-based telemetry displays.

  12. Operation SANDSTONE: 1948

    Science.gov (United States)

    1983-12-19

    8217qOKINWOTME X_ ENJEBI LR UNU/ MIJ!KADREK P, 1BOKOLU BO) KENE LAB .-. •ELLE ,AEJ • LUJORS• I i F L E 149N" YOKE (49 KT). TOWVER I,. L QJWA% ALIE’.I t...MSRB-60 12 Cy ATTN: DD Merchant Marine Academy Field Comand ATTN: Director of Libraries Defense iuclear Agency Naval Historical Center ATTN: FCLS, MAJ...Judge Adv Gen ATTN: OMA, DP-22 ATTN: Code 73 Nevada Operations Office U.S. Merchant Marine Academy ATTN: Health Physics Div ATTN: Librarian 2 cy ATTN: R

  13. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  14. A science of operations

    CERN Document Server

    Priestley, Mark

    2011-01-01

    Today, computers fulfil a dazzling array of roles, a flexibility resulting from the great range of programs that can be run on them. A Science of Operations examines the history of what we now call programming, defined not simply as computer programming, but more broadly as the definition of the steps involved in computations and other information-processing activities. This unique perspective highlights how the history of programming is distinct from the history of the computer, despite the close relationship between the two in the 20th century. The book also discusses how the development of

  15. Operation for ensidig recurrensparese

    DEFF Research Database (Denmark)

    Melchiors, Jacob; Rasmussen, Niels

    2009-01-01

    INTRODUCTION: Medialisation surgery for unilateral recurrent nerve paralysis has been performed for the past 100 years to improve voice quality. The aim of this paper is to describe our surgical methods and evaluate the results using subjective and objective parameters with an emphasis on acoustic...... voice analysis. MATERIAL AND METHODS: Retrospective cohort study of 42 consecutively operated patients from 1996 to 2006. Twenty-eight patients were treated with a hydroxyapatite prosthesis, which was inserted into the larynx (VoCom), nine patients had a silicone bead oil injected into the paretic vocal...

  16. Conceptualizing operations strategy processes

    DEFF Research Database (Denmark)

    Rytter, Niels Gorm; Boer, Harry; Koch, Christian

    2007-01-01

    Purpose - The purpose of this paper is to present insights into operations strategy (OS) in practice. It outlines a conceptualization and model of OS processes and, based on findings from an in-depth and longitudinal case study, contributes to further development of extant OS models and methods......; taking place in five dimensions of change - technical-rational, cultural, political, project management, and facilitation; and typically unfolding as a sequential and parallel, ordered and disordered, planned and emergent as well as top-down and bottom-up process. The proposed OS conceptualization...

  17. Meteorology in site operations

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    During the site selection and design phases of a plant, meteorological assistance must be based on past records, usually accumulated at stations not actually on the site. These preliminary atadvices will be averages and extremes that might be expected. After a location has been chosen and work has begun, current and forecast weather conditions become of immediate concern. On-site meteorological observations and forecasts have many applications to the operating program of an atomic energy site. Requirements may range from observations of the daily minimum temperatures to forecasts of radiation dosages from airborne clouds

  18. GMRES and integral operators

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, C.T.; Xue, Z.Q. [North Carolina State Univ., Raleigh, NC (United States)

    1994-12-31

    Many discretizations of integral equations and compact fixed point problems are collectively compact and strongly convergent in spaces of continuous functions. These properties not only lead to stable and convergent approximations but also can be used in the construction of fast multilevel algorithms. Recently the GMRES algorithm has become a standard coarse mesh solver. The purpose of this paper is to show how the special properties of integral operators and their approximations are reflected in the performance of the GMRES iteration and how these properties can be used to strengthen the norm in which convergence takes place. The authors illustrate these ideas with composite Gauss rules for integral equations on the unit interval.

  19. Efficiency of PRECIS Role Operators.

    Science.gov (United States)

    Mahapatra, M.; Biswas, S. C.

    1984-01-01

    Describes research which measured the efficiency of role operators through frequency of appearances in PRECIS input strings for 200 abstracts related to taxation, genetic psychology, and Shakespearian drama. Frequencies of appearance of major categories of role operators, role operators in different subjects, individual main line operators, and…

  20. Space shuttle operations integration plan

    Science.gov (United States)

    1975-01-01

    The Operations Integration Plan is presented, which is to provide functional definition of the activities necessary to develop and integrate shuttle operating plans and facilities to support flight, flight control, and operations. It identifies the major tasks, the organizations responsible, their interrelationships, the sequence of activities and interfaces, and the resultant products related to operations integration.

  1. Advanced Neutron Source operating philosophy

    International Nuclear Information System (INIS)

    Houser, M.M.

    1993-01-01

    An operating philosophy and operations cost estimate were prepared to support the Conceptual Design Report for the Advanced Neutron Source (ANS), a new research reactor planned for the Oak Ridge National Laboratory (ORNL). The operating philosophy was part of the initial effort of the ANS Human Factors Program, was integrated into the conceptual design, and addressed operational issues such as remote vs local operation; control room layout and responsibility issues; role of the operator; simulation and training; staffing levels; and plant computer systems. This paper will report on the overall plans and purpose for the operations work, the results of the work done for conceptual design, and plans for future effort

  2. TFTR initial operations

    International Nuclear Information System (INIS)

    Young, K.M.; Bell, M.; Blanchard, W.R.

    1984-01-01

    TFTR (Tokamak Fusion Test Reactor) has operated since December 1982 with ohmically heated plasmas. Routine operation with feedback control of plasma current, position and density has been obtained for plasmas with Isub(p) approx.= 800 kA, a = 68 cm, R = 250 cm, and Bsub(t) = 27 kG. A maximum plasma current of 1 MA was achieved with q approx.= 2.5. Energy confinement times of approx. 150 msec were measured for hydrogen and deuterium plasmas with n-barsub(e) approx.= 2 x 10 13 cm -3 , Tsub(e)(O) approx.= 1.5 keV, Tsub(i)(O) approx.= 1.5 keV and Zsub(eff) approx.= 3. The preliminary results suggest a size-cubed scaling from PLT, and are consistent with Alcator C scaling where tau approx. nR 2 a. Initial measurements of plasma disruption characteristics indicate current decay rates of approx. 800 kA in 8 ms which is within the TFTR design requirement of 3 MA in 3 ms. (author)

  3. ATLAS solenoid operates underground

    CERN Multimedia

    2006-01-01

    A new phase for the ATLAS collaboration started with the first operation of a completed sub-system: the Central Solenoid. Teams monitoring the cooling and powering of the ATLAS solenoid in the control room. The solenoid was cooled down to 4.5 K from 17 to 23 May. The first current was established the same evening that the solenoid became cold and superconductive. 'This makes the ATLAS Central Solenoid the very first cold and superconducting magnet to be operated in the LHC underground areas!', said Takahiko Kondo, professor at KEK. Though the current was limited to 1 kA, the cool-down and powering of the solenoid was a major milestone for all of the control, cryogenic, power and vacuum systems-a milestone reached by the hard work and many long evenings invested by various teams from ATLAS, all of CERN's departments and several large and small companies. Since the Central Solenoid and the barrel liquid argon (LAr) calorimeter share the same cryostat vacuum vessel, this achievement was only possible in perfe...

  4. Elementary Thermal Operations

    DEFF Research Database (Denmark)

    Lostaglio, Matteo; Alhambra, Álvaro M.; Perry, Christopher

    2018-01-01

    To what extent do thermodynamic resource theories capture physically relevant constraints? Inspired by quantum computation, we define a set of elementary thermodynamic gates that only act on 2 energy levels of a system at a time. We show that this theory is well reproduced by a Jaynes-Cummings in......To what extent do thermodynamic resource theories capture physically relevant constraints? Inspired by quantum computation, we define a set of elementary thermodynamic gates that only act on 2 energy levels of a system at a time. We show that this theory is well reproduced by a Jaynes......-Cummings interaction in rotating wave approximation and draw a connection to standard descriptions of thermalisation. We then prove that elementary thermal operations present tighter constraints on the allowed transformations than thermal operations. Mathematically, this illustrates the failure at finite temperature...... to do so, including necessary and sufficient conditions for a given change of the population to be possible. As an example, we describe the resource theory of the Jaynes-Cummings model. Finally, we initiate an investigation into how our resource theories can be applied to Heat Bath Algorithmic Cooling...

  5. Operations dashboard: comparative study

    Science.gov (United States)

    Ramly, Noor Nashriq; Ismail, Ahmad Zuhairi; Aziz, Mohd Haris; Ahmad, Nurul Haszeli

    2011-10-01

    In this present days and age, there are increasing needs for companies to monitor application and infrastructure health. Apart from having proactive measures to secure their application and infrastructure, many see monitoring dashboards as crucial investment in disaster preparedness. As companies struggle to find the best solution to cater for their needs and interest for monitoring their application and infrastructure's health, this paper summarizes the studies made on several known off-the-shelf operations dashboard and in-house developed dashboard. A few criteria of good dashboard are collected from previous studies carried out by several researchers and rank them according to importance and business needs. The finalized criteria that will be discussed in later sections are data visualization, performance indicator, dashboard personalization, audit capability and alert/ notification. Comparative studies between several popular dashboards were then carried out to determine whether they met these criteria that we derived from the first exercise. The findings hopefully can be used to educate and provide an overview of selecting the best IT application and infrastructure operations dashboard that suit business needs, thus become the main contribution of this paper.

  6. TFTR initial operations

    International Nuclear Information System (INIS)

    Young, K.M.; Bell, M.; Blanchard, W.R.

    1983-11-01

    The Tokamak Fusion Test Reactor (TFTR) has operated since December 1982 with ohmically heated plasmas. Routine operation with feedback control of plasma current, position, and density has been obtained for plasmas with I/sub p/ approx. = 800 kA, a = 68 cm, R = 250 cm, and B/sub t/ = 27 kG. A maximum plasma current of 1 MA was achieved with q approx. = 2.5. Energy confinement times of approx. 150 msec were measured for hydrogen and deuterium plasmas with anti n/sub e/ approx. = 2 x 10 13 cm -3 , T/sub e/ (0) approx. = 1.5 keV, T/sub i/ (0) approx. = 1.5 keV, and Z/sub eff/ approx. = 3. The preliminary results suggest a size-cubed scaling from PLT and are consistent with Alcator C scaling where tau approx. nR 2 a. Initial measurements of plasma disruption characteristics indicate current decay rates of approx. 800 kA in 8 ms which is within the TFTR design requirement of 3 MA in 3 ms

  7. Distributed Operations Planning

    Science.gov (United States)

    Fox, Jason; Norris, Jeffrey; Powell, Mark; Rabe, Kenneth; Shams, Khawaja

    2007-01-01

    Maestro software provides a secure and distributed mission planning system for long-term missions in general, and the Mars Exploration Rover Mission (MER) specifically. Maestro, the successor to the Science Activity Planner, has a heavy emphasis on portability and distributed operations, and requires no data replication or expensive hardware, instead relying on a set of services functioning on JPL institutional servers. Maestro works on most current computers with network connections, including laptops. When browsing down-link data from a spacecraft, Maestro functions similarly to being on a Web browser. After authenticating the user, it connects to a database server to query an index of data products. It then contacts a Web server to download and display the actual data products. The software also includes collaboration support based upon a highly reliable messaging system. Modifications made to targets in one instance are quickly and securely transmitted to other instances of Maestro. The back end that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

  8. Reactor operation monitor

    International Nuclear Information System (INIS)

    Sakagami, Masaharu.

    1982-01-01

    Purpose: To improve the working performance of a reactor by extending the range for the power conditioning due to the control rod operation and flow rate control. Constitution: The results of calculations for the power distribution and the burn-up degree distribution of the reactor core from a reactor performance computer that processes each of measuring signals in a nuclear power plant are used as the inputs for a computing device of the fuel rod power hysteresis to form the power hysteresis for each of the fuel rods up to the present time. The data are used as the inputs for the computing device of the fuel rod performance index, and the fuel rod performance index representing the critical values for the stresses in the fuel rod cladding tubes and the critical values for the duration of the stresses determined from the power hysteresis and the burn-up degree of the fuel rod are calculated for each of the fuel rods. Accordingly, the power conditioning can be carried out upon power-up in the reactor while monitoring the fuel rod performance index f(t) for each of the fuel assemblies, whereby the range for the power conditioning due to the control rod operation and the flow rate control can be extended relative to fuel assemblies in which f(t) is smaller than 1. (Yoshino, Y.)

  9. Operating experience at CEBAF

    International Nuclear Information System (INIS)

    Legg, R.

    1996-01-01

    CEBAF, the Continuous Electron Beam Accelerator Facility, is a 5-pass, recirculating, superconducting rf linac designed to provide exceptional beam quality at 4 GeV up to 200 μA CW. It is made up of an injector, two 400-MeV linacs, and 9 recirculation arcs having a total beamline length of more than 4.5 km. On Nov. 5, 1995, CEBAF delivered a 4 GeV, 25-μA CW electron beam to the first of 3 experimental halls and the experimental physics program was started 10 days later. Accelerator availability during the first month of the experimental run exceeded 75%. Beam properties measured in the experimental hall to date are a one sigma momentum spread of 5x10 -5 and an rms emittance of 0.2 nanometer-radians, better than design specification. CW beam has been provided from all 5 passes at 800 MeV intervals. Outstanding performance of the superconducting linacs suggests a machine energy upgrade to 6 GeV in the near term with eventual machine operation at 8-10 GeV. Results from commissioning and operations experience since the last conference are presented

  10. Planck-suppressed operators

    International Nuclear Information System (INIS)

    Assassi, Valentin; Baumann, Daniel; Green, Daniel; McAllister, Liam

    2014-01-01

    We show that the recent Planck limits on primordial non-Gaussianity impose strong constraints on light hidden sector fields coupled to the inflaton via operators suppressed by a high mass scale Λ. We study a simple effective field theory in which a hidden sector field is coupled to a shift-symmetric inflaton via arbitrary operators up to dimension five. Self-interactions in the hidden sector lead to non-Gaussianity in the curvature perturbations. To be consistent with the Planck limit on local non-Gaussianity, the coupling to any hidden sector with light fields and natural cubic couplings must be suppressed by a very high scale Λ > 10 5 H. Even if the hidden sector has Gaussian correlations, nonlinearities in the mixing with the inflaton still lead to non-Gaussian curvature perturbations. In this case, the non-Gaussianity is of the equilateral or orthogonal type, and the Planck data requires Λ > 10 2 H

  11. Access control system operation

    International Nuclear Information System (INIS)

    Barnes, L.D.

    1981-06-01

    An automated method for the control and monitoring of personnel movement throughout the site was developed under contract to the Department of Energy by Allied-General Nuclear Services (AGNS) at the Barnwell Nuclear Fuel Plant (BNFP). These automated features provide strict enforcement of personnel access policy without routine patrol officer involvement. Identification methods include identification by employee ID number, identification by voice verification and identification by physical security officer verification. The ability to grant each level of access authority is distributed over the organization to prevent any single individual at any level in the organization from being capable of issuing an authorization for entry into sensitive areas. Each access event is recorded. As access events occur, the inventory of both the entered and the exited control area is updated so that a current inventory is always available for display. The system has been operated since 1979 in a development mode and many revisions have been implemented in hardware and software as areas were added to the system. Recent changes have involved the installation of backup systems and other features required to achieve a high reliability. The access control system and recent operating experience are described

  12. Prevalence of operator fatigue in winter maintenance operations.

    Science.gov (United States)

    Camden, Matthew C; Medina-Flintsch, Alejandra; Hickman, Jeffrey S; Bryce, James; Flintsch, Gerardo; Hanowski, Richard J

    2018-02-02

    Similar to commercial motor vehicle drivers, winter maintenance operators are likely to be at an increased risk of becoming fatigued while driving due to long, inconsistent shifts, environmental stressors, and limited opportunities for sleep. Despite this risk, there is little research concerning the prevalence of winter maintenance operator fatigue during winter emergencies. The purpose of this research was to investigate the prevalence, sources, and countermeasures of fatigue in winter maintenance operations. Questionnaires from 1043 winter maintenance operators and 453 managers were received from 29 Clear Road member states. Results confirmed that fatigue was prevalent in winter maintenance operations. Over 70% of the operators and managers believed that fatigue has a moderate to significant impact on winter maintenance operations. Approximately 75% of winter maintenance operators reported to at least sometimes drive while fatigued, and 96% of managers believed their winter maintenance operators drove while fatigued at least some of the time. Furthermore, winter maintenance operators and managers identified fatigue countermeasures and sources of fatigue related to winter maintenance equipment. However, the countermeasures believed to be the most effective at reducing fatigue during winter emergencies (i.e., naps) were underutilized. For example, winter maintenance operators reported to never use naps to eliminate fatigue. These results indicated winter maintenance operations are impacted by operator fatigue. These results support the increased need for research and effective countermeasures targeting winter maintenance operator fatigue. Copyright © 2018 Elsevier Ltd. All rights reserved.

  13. Compton Operator in Quantum Electrodynamics

    International Nuclear Information System (INIS)

    Garcia, Hector Luna; Garcia, Luz Maria

    2015-01-01

    In the frame in the quantum electrodynamics exist four basic operators; the electron self-energy, vacuum polarization, vertex correction, and the Compton operator. The first three operators are very important by its relation with renormalized and Ward identity. However, the Compton operator has equal importance, but without divergence, and little attention has been given it. We have calculated the Compton operator and obtained the closed expression for it in the frame of dimensionally continuous integration and hypergeometric functions

  14. Space Station Freedom operations costs

    Science.gov (United States)

    Accola, Anne L.; Williams, Gregory J.

    1988-01-01

    Measures to reduce the operation costs of the Space Station which can be implemented in the design and development stages are discussed. Operational functions are described in the context of an overall operations concept. The provisions for operations cost responsibilities among the partners in the Space Station program are presented. Cost estimating methodologies and the way in which operations costs affect the design and development process are examined.

  15. Pyrolaser Operating System

    Science.gov (United States)

    Roberts, Floyd E., III

    1994-01-01

    Software provides for control and acquisition of data from optical pyrometer. There are six individual programs in PYROLASER package. Provides quick and easy way to set up, control, and program standard Pyrolaser. Temperature and emisivity measurements either collected as if Pyrolaser in manual operating mode or displayed on real-time strip charts and stored in standard spreadsheet format for posttest analysis. Shell supplied to allow macros, which are test-specific, added to system easily. Written using Labview software for use on Macintosh-series computers running System 6.0.3 or later, Sun Sparc-series computers running Open-Windows 3.0 or MIT's X Window System (X11R4 or X11R5), and IBM PC or compatible computers running Microsoft Windows 3.1 or later.

  16. KEPLER SCIENCE OPERATIONS

    International Nuclear Information System (INIS)

    Haas, Michael R.; Bryson, Steve T.; Dotson, Jessie L.; Koch, David G.; Smith, Marcie; Sobeck, Charles K.; Batalha, Natalie M.; Caldwell, Douglas A.; Jenkins, Jon M.; Van Cleve, Jeffrey E.; Hall, Jennifer; Klaus, Todd C.; Middour, Chris; Thompson, Richard S.; Kolodziejczak, Jeffrey; Stober, Jeremy

    2010-01-01

    Kepler's mission design includes a comprehensive plan for commissioning and science operations. The commissioning phase completed all critical tasks and accomplished all mission objectives within a week of the pre-launch plan. Since the start of science data collection, the nominal timeline has been interrupted by two safe-mode events, several losses of fine point, and some small pointing adjustments. The most important anomalies are understood and mitigated, so Kepler's technical performance has improved significantly over this period, and the prognosis for mission success is excellent. The Kepler data archive is established and hosting data for the science team, guest observers, and the public. The first data to become publicly available include the monthly full-frame images and the light curves for targets that are dropped from the exoplanet program or released after publication. Data are placed in the archive on a quarterly basis; the Kepler Results Catalog will be released annually starting in 2011.

  17. Ship operations report, 1975

    International Nuclear Information System (INIS)

    1976-01-01

    The NOAA Ship Operations Report 1975 was developed to provide a summary of projects undertaken during calendar year 1975. The report was prepared from season, cruise and special reports submitted by ships of the fleet. This report is promulgated for inhouse dissemination in the National Oceanic and Atmospheric Administration, for collaborating and interested agencies, and for use by members of the scientific community. Throughout the year, ships routinely collected and transmitted weather data. Similarly, as NOAA participants in the Integrated Global Ocean Station System (IGOSS) service program, XBT observations were taken and either radioed or submitted in log form via mail. In addition, particulate and radionuclide samples were taken in cooperation with the Atomic Energy Commission, sediment samples were obtained for the Smithsonian Institution and observations were made of marine mammals

  18. Managing operational paradoxes

    International Nuclear Information System (INIS)

    Olson, J.; Baker, K.; Thurber, J.

    1992-01-01

    The economic, regulatory, and social environment of commercial nuclear power has changed dramatically in the last 10 yr. In addition to the increased regulatory pressure resulting from the Three Mile Island incident and other factors, nuclear utilities have experienced increasing financial pressure from state public utility commissions and investors. To successfully manage nuclear power plants in today's environment requires different skills and strategies than were required 10 yr ago. External pressures on the utility and plant organization have created a series of operational paradoxes unmatched in the history of commercial nuclear power. This paper is based on a synthesis of findings and observations from a series of studies conducted by the authors over the past 10 yr. The authors identify a series of specific paradoxes facing managers of nuclear power plants and suggest several strategies for managing these paradoxes

  19. FRMAC Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    Frandsen, K.

    2010-05-01

    In the event of a major radiological incident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities. The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. This manual describes the FRMAC’s response activities in a radiological incident. It also outlines how FRMAC fits in the National Incident Management System (NIMS) under the National Response Framework (NRF) and describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the affected areas. In the event of a potential or existing major radiological incident, the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is responsible for establishing and managing the FRMAC during the initial phases.

  20. Evolution of operations culture

    International Nuclear Information System (INIS)

    Gould, D.

    2008-01-01

    Over the last 3 decades there have been many changes in the operating culture of nuclear power plants. One of the main thrusts of these changes has been to move away from an early model where there was heavy reliance on trained and experienced personnel with free reign to do the right thing, towards a newer model relying on strict adherence to prescribed procedures and processes. This paper will discuss how some of these changes have taken place and briefly consider at what point the correct balance between these models is achieved. This paper is based solely on the experience of the author who has spent twenty years as a licensed control room supervisor. The reader may view this paper as more of an opinion piece than a typical scientific paper. (author)

  1. Enhancing operational nuclear safety

    International Nuclear Information System (INIS)

    Sengoku, Katsuhisa

    2008-01-01

    's safety standards and program which provides the safety objective following the 10 fundamental safety principles. The safety requirements defines the functional conditions required for safety and the safety guides provides user-friendly and up-to-date practical guidance representing good/best practices to fulfill the requirements. The IAEA provides safety review services and fields safety review teams upon request of member states for the regulatory, the International Regulatory Review Team (IRRT) and Operational Safety Review Team (OSART) and Peer Review of the Operational and Safety Performance Experience Review (PROSPER). The OSART programme's purpose is to assist member states in enhancing the operational safety of individual nuclear power plants and to promote the continuous development of operational safety within all member states by the dissemination of information on good practice. The OSART Mission Results (OSMIR) database contains the results from 73 OSART missions and 54 follow up visits from 1991 and its continually updated. The Asian Nuclear Safety Network (ANSN) was established to pool and share existing and new technical knowledge and practical experience to further improve the safety of nuclear installation in Asia. In summary, the enhancement of the GNSR is anchored in the recognition that all the states are in the same boat and the increasing importance of sharing and mutual learning, sharing knowledge and experience through regional and global networking. It requires joint and coordinated strategy by all states. The IAEA is willing and ready to support the GNSR through the establishment and application of safety standards, and safety review and advisory services and international instruments. (Author)

  2. Wind turbine operated sailboat

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R.

    1990-07-31

    A wind powered boat is disclosed which incorporates a vertical axis rotary turbine. A shaft portion extends downwardly from the turbine to a water pump, with the boat being provided with a forwardly opening inlet and a rearwardly opening outlet from the water pump. When rotating, the turbine operates the pump by the shaft to draw in water through the inlet, thereby creating a low pressure area in front of the boat, and to force the water out through the outlet for propelling the boat. In a preferred embodiment, the boat has a catamaran construction or is a large ocean going vessel with enough width to provide a buffer to either side of the turbine, and the turbine is the Darrieus rotor type. The pump is a standard centrifugal type of pump. A self adjusting braking device for the turbine is also disclosed, which prevents over-rotation and is also capable of storing heat energy generated during braking. 4 figs.

  3. Engineering co-operation

    Energy Technology Data Exchange (ETDEWEB)

    Hryniszak, W

    1981-06-01

    A purposeful employment policy for human energy is basic to solving the energy dilemma, but a lack of understanding about human behavior has allowed man's exploitive characteristics to dominate during the Inductrial Revolution. England is dependent on trade to survive, but the importance of size in world competition is seen in the trend toward multinational and partnership enterprises. Reflecting this increasing competition, the engineering industries see a need for government policies that acknowledge the importance of technology and the effects of those policies on productivity. Engineering progress requires the creativity of optimistic idealism and the realism of implementing new ideas. The training and nurturing of human resources should begin by broadening the education of engineers to emphasize the concepts of quality and cooperation between government and industry. Engineers and scientists, who work within society, need to understand national demands and to operate in accordance with the highest moral standards. (DCK)

  4. First operation of BEBC

    CERN Document Server

    Reinhard, H P

    1973-01-01

    BEBC has been successfully operated from January to March 1973. The stainless steel piston was used in the magnetic field up to 2.6 T without visible degradation of the tracks. The pictures show good contrast and resolution and no visible distortion due to thermal turbulences. Reconstruction has not yet been done because only two views are available and no optical constants of the fish eyes were measured under working conditions. The dynamic load was quite high (25 KJ per pulse) and mainly due to excessive boiling around the piston seal. Actually the gap between the seal and the piston has been found to be several tenths of mm. Furthermore the pump which was supposed to run the heat exchanger near the piston seal below atmospheric pressure could not be put into service. (0 refs).

  5. Bascoms operation for pilonidalcyste

    DEFF Research Database (Denmark)

    Bertelsen, C.A.; Jørgensen, Lars Nannestad

    2008-01-01

    . MATERIALS AND METHODS: 59 patients (53 male) underwent surgery between September 2004 and January 2007. The median age was 27.7 (16-48) years. The indication for surgery was recurrent pilonidal cysts in 17 cases, impaired wound healing after prior surgery in 7 cases and large cysts in 35 cases. RESULTS: All......INTRODUCTION: Treatment of pilonidal fistula often results in impaired wound healing and recurrence. After wide excision of the fistula, impaired healing and recurrence occur in up to 69% and 10-29% of cases, respectively. Based on these facts we decided to implement Bascom's cleft-lift operation...... reoperation due to infection, but none of these patients received postoperative antibiotics. 26 (44%) patients developed minor wound defects. In 22 (85%) of these cases, the wounds healed spontaneously in less than 3 months. 42 patients were followed for more than 6 months with a median follow-up of 19 (8...

  6. Operations of LHD

    International Nuclear Information System (INIS)

    Motojima, Osamu

    1995-01-01

    The Large Helical Device (LHD) is a big non-tokamak type superconducting toroidal fusion apparatus, which is an on-going project under construction being completed in 1997. Based on the results of the developments in both areas of the physics and technology researches concerned, the LHD project is expected to contribute to the necessary understandings of the currentless steady-state plasmas, which have a high performance of temperature, density, confinement time and beta value extrapolatable to the reactor regime (Q ∼ 0.35). This paper describes the necessary issues of the major engineering operations scenarios of LHD, which are especially concerned with the SC magnet technology, the expected SC coil performance and obtained technological flexibility, the required functions for the coil power supply and protection circuit, the system control, and the developed closed divertor system for the edge control

  7. Operating systems. [of computers

    Science.gov (United States)

    Denning, P. J.; Brown, R. L.

    1984-01-01

    A counter operating system creates a hierarchy of levels of abstraction, so that at a given level all details concerning lower levels can be ignored. This hierarchical structure separates functions according to their complexity, characteristic time scale, and level of abstraction. The lowest levels include the system's hardware; concepts associated explicitly with the coordination of multiple tasks appear at intermediate levels, which conduct 'primitive processes'. Software semaphore is the mechanism controlling primitive processes that must be synchronized. At higher levels lie, in rising order, the access to the secondary storage devices of a particular machine, a 'virtual memory' scheme for managing the main and secondary memories, communication between processes by way of a mechanism called a 'pipe', access to external input and output devices, and a hierarchy of directories cataloguing the hardware and software objects to which access must be controlled.

  8. Therapy operation at GSI

    International Nuclear Information System (INIS)

    Scheeler, U.; Wilms, D.

    2004-01-01

    GSI is the heavy ion research center in Germany operating the three accelerators UNILAC (linac), SIS (synchrotron) and ESR (storage ring). Experiments are made on the fields of nuclear and atomic physics, plasma physics, nuclear chemistry, material research and biophysics. The most important program of the biophysics group is the study of the advantage of Carbon ions for cancer irradiation. The developed raster-scanning technique allows the direct 3D irradiation of irregular shaped tumor and minimizes the dose in healthy tissue [1],[2]. This method requires the reliable request of a large variety of beam parameters (energy, intensity, beam-spot diameter) for sequential synchrotron cycles. Certain restrictions to the physics experimental program have to be considered during the treatment sessions. To deliver excellent conditions for the other experiments, these restrictions had to be kept a small as possible. (author)

  9. Gulf operators resuming production

    International Nuclear Information System (INIS)

    Koen, A.D.

    1992-01-01

    This paper reports that Gulf of Mexico operators last week were gradually restoring production at installations struck by Hurricane Andrew. The Minerals Management Service continued receiving reports of more damage. By the end of the day Sept. 8, MMS had received reports of damage to 83 pipeline segments and 193 platforms and satellite installations. Damage reports listed 112 installations with structural damage, 13 platforms toppled and five leaning, and 30 satellite platforms toppled and 33 leaning. But despite the extent of damage the storm inflicted on oil and gas installations in the gulf, it pales in comparison to the misery and suffering the storm caused in Florida and Louisiana, an oil company official said

  10. Gulf operations still recovering

    International Nuclear Information System (INIS)

    Koen, A.D.

    1992-01-01

    This paper reports that reports of damage caused by Hurricane Andrew were leveling off last week at the U.S. Minerals Management Service as Gulf of Mexico operators pressed ahead with repairs. The hurricane struck South Florida Aug. 4, churned west into the gulf, then swung north and hit the South Louisiana coast Aug. 5. By the close of business Sept. 8 MMS had received damage reports covering 83 pipeline segments and 193 platforms and satellite installations. MMS last week estimated about 500 MMcfd of gas production had been restored in the gulf and 100,000-150,000 b/d of oil. Production still lost as a result of Andrew was estimated at 2-2.5 bcfd of gas and 90,000-120 b/d of oil. MMS estimates Gulf of Mexico wells before the storm were producing about 12.5-13 bcfd of gas and 750,000 b/d of oil

  11. Reviewing operational experience feedback

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of this document is to provide detailed supplementary guidance to OSART experts to aid in the evaluation of operational experience feedback (OEF) programmes at nuclear power plants. The document begins by describing the objectives of an OEF programme. It goes on to indicate preparatory work and investigatory guidance for the expert. Section 5 describes attributes of an excellent OEF programme. Appended to these guidelines are examples of OEF documents from various plants. These are intended to help the expert by demonstrating the actual implementation of OEF in practice. These guidelines are in no way intended to conflict with existing national regulations and rules. A comprehensive OEF programme, as described in Section 2, would be impossible to evaluated in detail in the amount of time typically allocated for assessing OEF in an OSART review. The expert must use his or her time wisely by concentrating on those areas that appear to be the weakest

  12. Global Operations Networks

    DEFF Research Database (Denmark)

    In the current context of global economic liberalisation and technological advancements, industrial companies are less likely to generate value in the traditional vertically integrated chain. Instead, they are doing so by means of elaborate cross-border and cross-organisational networks. As a rule......, these networks are configured on a global basis and consist of diverse and interdependent affiliates (linked both through ownership and non-equity relationships), which are engaged in an exchange of goods, services and information. The Scandinavian context is no exception to this trend. Nevertheless......, international comparative studies providing comprehensive insights from it are still rare. With the objective of bridging this gap, Global Operations Networks (GONE) project (sponsored by the Danish Research Council) brought together numerous academic and industrial partners from Denmark, Sweden and Finland...

  13. RH Packaging Operations Manual

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2003-01-01

    This procedure provides operating instructions for the RH-TRU 72-B Road Cask, Waste Shipping Package. In this document, ''Packaging'' refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). ''Package'' refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Loading of the RH 72-B cask can be done two ways, on the RH cask trailer in the vertical position or by removing the cask from the trailer and loading it in a facility designed for remote-handling (RH). Before loading the 72-B cask, loading procedures and changes to the loading procedures for the 72-B cask must be sent to CBFO at sitedocuments at wipp.ws for approval

  14. International operations networks

    CERN Document Server

    Farooq, Sami; Cheng, Yang

    2014-01-01

    Although the area of International Manufacturing Network (IMN) and International Operations Network (ION) has received considerable attention in the literature, most of studies appear multifaceted and interdisciplinary, and thereby require thorough investigation from both academic and practical perspectives, in order to deepen our related understanding. The book seeks advanced contributions that will combine theoretical insights and empirical experience by offering a detailed examination of IMN and, further, ION from various perspectives. This book can be used as a reference material for scholarpractitioners, business executives, and university researchers who need to deepen their understanding on the importance and influence of IMN and ION as well as their development. The book is important because there are few reference/resource materials available related to IMN and ION.

  15. Operation and machine studies

    International Nuclear Information System (INIS)

    1992-01-01

    This annual report describes the GANIL (Grand accelerateur national d'ions lourds, Caen, France) operation and the machine studies realized in 1992. Metallic ions have been accelerated during 36 pc of the time; some were produced for the first time at GANIL: 125 Te, 52 Cr with ECR3, 181 Ta with ECR4. The various machine studies are: comparison of lifetimes of carbon sheets, charge exchange of very heavy ions in carbon foils and in the residual gas of the Ganil cyclotrons, commissioning of the new high intensity axial injection system for Ganil, tantalum acceleration with the new injector, a cyclotron as a mass spectrometer; other studies concerned: implementing the new control system, gettering flux measurement, energy deposited by neutrons and gamma rays in the cryogenic system of SISSI; latest developments on multicharged ECR ion sources, and an on-line isotopic separator test bench at Ganil

  16. Small reactor operating mode

    International Nuclear Information System (INIS)

    Snell, V.G.

    1997-01-01

    There is a potential need for small reactors in the future for applications such as district heating, electricity production at remote sites, and desalination. Nuclear power can provide these at low cost and with insignificant pollution. The economies required by the small scale application, and/or the remote location, require a review of the size and location of the operating staff. Current concepts range all the way from reactors which are fully automatic, and need no local attention for days or weeks, to those with reduced local staff. In general the less dependent a reactor is on local human intervention, the greater its dependence on intrinsic safety features such as passive decay heat removal, low-stored energy and limited reactivity speed and depth in the control systems. A case study of the design and licensing of the SLOWPOKE Energy System heating reactor is presented. (author)

  17. Motor-operated gearbox efficiency

    Energy Technology Data Exchange (ETDEWEB)

    DeWall, K.G.; Watkins, J.C.; Bramwell, D. [Idaho National Engineering Lab., Idaho Falls, ID (United States); Weidenhamer, G.H.

    1996-12-01

    Researchers at the Idaho National Engineering Laboratory recently conducted tests investigating the operating efficiency of the power train (gearbox) in motor-operators typically used in nuclear power plants to power motor-operated valves. Actual efficiency ratios were determined from in-line measurements of electric motor torque (input to the operator gearbox) and valve stem torque (output from the gearbox) while the operators were subjected to gradually increasing loads until the electric motor stalled. The testing included parametric studies under reduced voltage and elevated temperature conditions. As part of the analysis of the results, the authors compared efficiency values determined from testing to the values published by the operator manufacturer and typically used by the industry in calculations for estimating motor-operator capabilities. The operators they tested under load ran at efficiencies lower than the running efficiency (typically 50%) published by the operator manufacturer.

  18. Motor-operated gearbox efficiency

    International Nuclear Information System (INIS)

    DeWall, K.G.; Watkins, J.C.; Bramwell, D.; Weidenhamer, G.H.

    1996-01-01

    Researchers at the Idaho National Engineering Laboratory recently conducted tests investigating the operating efficiency of the power train (gearbox) in motor-operators typically used in nuclear power plants to power motor-operated valves. Actual efficiency ratios were determined from in-line measurements of electric motor torque (input to the operator gearbox) and valve stem torque (output from the gearbox) while the operators were subjected to gradually increasing loads until the electric motor stalled. The testing included parametric studies under reduced voltage and elevated temperature conditions. As part of the analysis of the results, the authors compared efficiency values determined from testing to the values published by the operator manufacturer and typically used by the industry in calculations for estimating motor-operator capabilities. The operators they tested under load ran at efficiencies lower than the running efficiency (typically 50%) published by the operator manufacturer

  19. Computerized automatic tip scanning operation

    International Nuclear Information System (INIS)

    Nishikawa, K.; Fukushima, T.; Nakai, H.; Yanagisawa, A.

    1984-01-01

    In BWR nuclear power stations the Traversing Incore Probe (TIP) system is one of the most important components in reactor monitoring and control. In previous TIP systems, however, operators have suffered from the complexity of operation and long operation time required. The system presented in this paper realizes the automatic operation of the TIP system by monitoring and driving it with a process computer. This system significantly reduces the burden on customer operators and improves plant efficiency by simplifying the operating procedure, augmenting the accuracy of the measured data, and shortening operating time. The process computer is one of the PODIA (Plant Operation by Displayed Information Automation) systems. This computer transfers control signals to the TIP control panel, which in turn drives equipment by microprocessor control. The process computer contains such components as the CRT/KB unit, the printer plotter, the hard copier, and the message typers required for efficient man-machine communications. Its operation and interface properties are described

  20. Motor-operator gearbox efficiency

    International Nuclear Information System (INIS)

    DeWall, K.G.; Watkins, J.C.; Bramwell, D.

    1996-01-01

    Researchers at the Idaho National Engineering Laboratory recently conducted tests investigating the operating efficiency of the power train (gearbox) in motor-operators typically used in nuclear power plants to power motor-operated valves. Actual efficiency ratios were determined from in-line measurements of electric motor torque (input to the operator gearbox) and valve stem torque (output from the gearbox) while the operators were subjected to gradually increasing loads until the electric motor stalled. The testing included parametric studies under reduced voltage and elevated temperature conditions. As part of the analysis of the results, we compared efficiency values determined from testing to the values published by the operator manufacturer and typically used by the industry in calculations for estimating motor-operator capabilities. The operators we tested under load ran at efficiencies lower than the running efficiency (typically 50%) published by the operator manufacturer

  1. Standardization of biodosimetry operations

    International Nuclear Information System (INIS)

    Dainiak, Nicholas

    2016-01-01

    Methods and procedures for generating, interpreting and scoring the frequency of dicentric chromosomes vary among cytogenetic biodosimetry laboratories (CBLs). This variation adds to the already considerable lack of precision inherent in the dicentric chromosome assay (DCA). Although variability in sample collection, cell preparation, equipment and dicentric frequency scoring can never be eliminated with certainty, it can be substantially minimized, resulting in reduced scatter and improved precision. Use of standard operating procedures and technician exchange may help to mitigate variation. Although the development and adoption of international standards (ISO 21243 and ISO 19238) has helped to reduce variation in standard operating procedures (SOPs), all CBLs must maintain process improvement, and those with challenges may require additional assistance. Sources of variation that may not be readily apparent in the SOPs for sample collection and processing include variability in ambient laboratory conditions, media, serum lot and quantity and the use of particular combinations of cytokines. Variability in maintenance and calibration of metafer equipment, and in scoring criteria, reader proficiency and personal factors may need to be addressed. The calibration curve itself is a source of variation that requires control, using the same known-dose samples among CBLs, measurement of central tendency, and generation of common curves with periodic reassessment to detect drifts in dicentric yield. Finally, the dose estimate should be based on common scoring criteria, using of the z-statistic. Although theoretically possible, it is practically impossible to propagate uncertainty over the entire calibration curve due to the many factors contributing to variance. Periodic re-evaluation of the curve is needed by comparison with newly published curves (using statistical analysis of differences) and determining their potential causes. (author)

  2. Operation Peace for Galilee: An Operational Analysis with Relevance Today

    National Research Council Canada - National Science Library

    Thomas, Wilbert

    1998-01-01

    .... Operation Peace for Galilee was epitomized by expert planning and operational excellence, as the IDF achieved its stated aim of establishing a PLO-free 40 kilometer buffer zone north of its border within 40 hours...

  3. Time Operators and Time Crystals

    OpenAIRE

    Nakatsugawa, K.; Fujii, T.; Saxena, A.; Tanda, S.

    2017-01-01

    We investigate time operators in the context of quantum time crystals in ring systems. We demonstrate that a self-adjoint time operator with a periodic time evolution can be derived for a free particle on a ring system: The conventional Aharonov-Bohm time operator is obtained by taking the infinite-radius limit. We also reveal the relationship between our time operator and a $\\mathcal PT$-symmetric time operator. We find that both time operators indeed describe the periodic time evolution of ...

  4. Structure of Hilbert space operators

    CERN Document Server

    Jiang, Chunlan

    2006-01-01

    This book exposes the internal structure of non-self-adjoint operators acting on complex separable infinite dimensional Hilbert space, by analyzing and studying the commutant of operators. A unique presentation of the theorem of Cowen-Douglas operators is given. The authors take the strongly irreducible operator as a basic model, and find complete similarity invariants of Cowen-Douglas operators by using K -theory, complex geometry and operator algebra tools. Sample Chapter(s). Chapter 1: Background (153 KB). Contents: Jordan Standard Theorem and K 0 -Group; Approximate Jordan Theorem of Opera

  5. Operational behaviour of a reactor normal operation and disturbances

    International Nuclear Information System (INIS)

    Geyer, K.H.

    1982-01-01

    During normal operation, the following topics are dealt with: primary and secondary coolant circuits - full load operation - start-up and shutdown - steady state part load diagramm. During disturbances and incidents, the following procedures are discussed: identification and detection of the events - automatic actions - manual actions of the operator - provided indications - explanation of actuated systems - basic information of reactor protection system. (RW)

  6. Survey of Operators Knowledge of Operation and Maintenance of ...

    African Journals Online (AJOL)

    Result showed that the machine failures encountered during operations were as a result of poor management, inadequate maintenance practices, and lack of spare parts, obsoleteness, overloading, careless operations and poor storage of machine after use. Recommendations were therefore given to improve the operation ...

  7. 46 CFR 151.45-7 - Shipping papers.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Shipping papers. 151.45-7 Section 151.45-7 Shipping... BULK LIQUID HAZARDOUS MATERIAL CARGOES Operations § 151.45-7 Shipping papers. Each barge carrying... towing vessel shall either have a copy of the shipping papers for each barge in his tow or he shall make...

  8. 46 CFR 56.01-1 - Scope (replaces 100.1).

    Science.gov (United States)

    2010-10-01

    ... ships' and barges' piping systems and appurtenances. (b) The respective piping systems installed on ships and barges shall have the necessary pumps, valves, regulation valves, safety valves, relief valves... operation of the vessel. (c) Piping for industrial systems on mobile offshore drilling units need not fully...

  9. Advanced Operating System Technologies

    Science.gov (United States)

    Cittolin, Sergio; Riccardi, Fabio; Vascotto, Sandro

    In this paper we describe an R&D effort to define an OS architecture suitable for the requirements of the Data Acquisition and Control of an LHC experiment. Large distributed computing systems are foreseen to be the core part of the DAQ and Control system of the future LHC experiments. Neworks of thousands of processors, handling dataflows of several gigaBytes per second, with very strict timing constraints (microseconds), will become a common experience in the following years. Problems like distributyed scheduling, real-time communication protocols, failure-tolerance, distributed monitoring and debugging will have to be faced. A solid software infrastructure will be required to manage this very complicared environment, and at this moment neither CERN has the necessary expertise to build it, nor any similar commercial implementation exists. Fortunately these problems are not unique to the particle and high energy physics experiments, and the current research work in the distributed systems field, especially in the distributed operating systems area, is trying to address many of the above mentioned issues. The world that we are going to face in the next ten years will be quite different and surely much more interconnected than the one we see now. Very ambitious projects exist, planning to link towns, nations and the world in a single "Data Highway". Teleconferencing, Video on Demend, Distributed Multimedia Applications are just a few examples of the very demanding tasks to which the computer industry is committing itself. This projects are triggering a great research effort in the distributed, real-time micro-kernel based operating systems field and in the software enginering areas. The purpose of our group is to collect the outcame of these different research efforts, and to establish a working environment where the different ideas and techniques can be tested, evaluated and possibly extended, to address the requirements of a DAQ and Control System suitable for LHC

  10. The LSST operations simulator

    Science.gov (United States)

    Delgado, Francisco; Saha, Abhijit; Chandrasekharan, Srinivasan; Cook, Kem; Petry, Catherine; Ridgway, Stephen

    2014-08-01

    The Operations Simulator for the Large Synoptic Survey Telescope (LSST; http://www.lsst.org) allows the planning of LSST observations that obey explicit science driven observing specifications, patterns, schema, and priorities, while optimizing against the constraints placed by design-specific opto-mechanical system performance of the telescope facility, site specific conditions as well as additional scheduled and unscheduled downtime. It has a detailed model to simulate the external conditions with real weather history data from the site, a fully parameterized kinematic model for the internal conditions of the telescope, camera and dome, and serves as a prototype for an automatic scheduler for the real time survey operations with LSST. The Simulator is a critical tool that has been key since very early in the project, to help validate the design parameters of the observatory against the science requirements and the goals from specific science programs. A simulation run records the characteristics of all observations (e.g., epoch, sky position, seeing, sky brightness) in a MySQL database, which can be queried for any desired purpose. Derivative information digests of the observing history are made with an analysis package called Simulation Survey Tools for Analysis and Reporting (SSTAR). Merit functions and metrics have been designed to examine how suitable a specific simulation run is for several different science applications. Software to efficiently compare the efficacy of different survey strategies for a wide variety of science applications using such a growing set of metrics is under development. A recent restructuring of the code allows us to a) use "look-ahead" strategies that avoid cadence sequences that cannot be completed due to observing constraints; and b) examine alternate optimization strategies, so that the most efficient scheduling algorithm(s) can be identified and used: even few-percent efficiency gains will create substantive scientific

  11. Composition operators with weak hyponormality

    Science.gov (United States)

    Burnap, Charles; Jung, Il Bong

    2008-01-01

    There are many operator classes that are weaker than p-hyponormal. These include p-quasihyponormal, absolute p-paranormal, p-paranormal, normaloid, and spectraloid. In this note, we discuss measure theoretic composition operators in these classes.

  12. Integrated Ground Operations Demonstration Units

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the AES Integrated Ground Operations Demonstration Units (IGODU) project is to demonstrate cost efficient cryogenic operations on a relevant...

  13. Operational safety at the FFTF

    International Nuclear Information System (INIS)

    Baird, Q.L.; Hagan, J.W.; Seeman, S.E.; Baker, S.M.

    1981-02-01

    An extensive operational nuclear safety program has been an integral part of the design, startup, and initial operating phases of the Fast Flux Test Facility (FFTF). During the design and construction of the facility, a program of independent safety overviews and analyses assured the provision of responsible safety margins within the plant, protective systems, and engineered safety features for protection of the public, operating staff, and the facility. The program is continuing through surveillance of operations to verify continued adherence to the established operating envelope and for timely identification of any trends potentially adverse to those margins. Experience from operation of FFTF is being utilized in the development of enhanced operational nuclear safety aids for application in follow-on breeder reactor power systems. The commendable plant and personnel safety experiences of FFTF through its startup and ascension to full power demonstrate the overall effectiveness of the FFTF operational nuclear safety program

  14. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  15. Operation Orange Street Resurfacing 2016

    Data.gov (United States)

    City of Jackson, Mississippi — Track Operation Orange Cone projects for 2016. “Operation Orange Cone” is an initiative launched in 2015 as part of the Yarber Administration’s push to address the...

  16. Operator bosonization on Riemann surfaces: new vertex operators

    International Nuclear Information System (INIS)

    Semikhatov, A.M.

    1989-01-01

    A new formalism is proposed for the construction of an operator theory of generalized ghost systems (bc theories of spin J) on Riemann surfaces (loop diagrams of the theory of closed strings). The operators of the bc system are expressed in terms of operators of the bosonic conformal theory on a Riemann surface. In contrast to the standard bosonization formulas, which have meaning only locally, operator Baker-Akhiezer functions, which are well defined globally on a Riemann surface of arbitrary genus, are introduced. The operator algebra of the Baker-Akhiezer functions generates explicitly the algebraic-geometric τ function and correlation functions of bc systems on Riemann surfaces

  17. Method of reactor operation

    International Nuclear Information System (INIS)

    Maeda, Katsuji.

    1982-01-01

    Purpose: To prevent stress corrosion cracks in stainless steels caused from hydrogen peroxide in reactor operation in which the density of hydrogen peroxide in the reactor water is controlled upon reactor start-up. Method: A heat exchanger equipped with a heat source for applying external heat is disposed into the recycling system for reactor coolants. Upon reactor start-up, the coolants are heated by the heat exchanger till arriving at a temperature at which the dissolving rate is faster than the forming rate of hydrogen peroxide in the coolants, and nuclear heating is started after reaching the above temperature. The temperature of the reactor water is increased in such a manner and, when it arrives at 140 0 C, extraction of control elements is started and the heat source for the heat exchanger is interrupted simultaneously. In this way spikes in the density of hydrogen peroxide are suppressed upon reactor start-up to thereby decrease the stress corrosion cracks in stainless steels. (Horiuchi, T.)

  18. Operative colonoscopic endoscopy.

    Science.gov (United States)

    Van Gossum, A; Bourgeois, F; Gay, F; Lievens, P; Adler, M; Cremer, M

    1992-01-01

    There are several conditions where operative colonoscopy is useful. Acute colonic pseudo-obstruction or Ogilvie's syndrome is characterized by a acute distension of the colon. Although medical management may be sufficient in many cases, endoscopic decompression must be performed when colonic distension is greater than 12 cm. Insertion of decompression tube to avoid rapid recurrence seems to be adequate. In case of massive lower intestinal hemorrhage, colonoscopy seems to be more accurate than mesenteric angiography. Such endoscopic examination requires an experienced endoscopist. Colonoscopic polypectomy has become the standard method for removal of colonic polyps. Factors influencing the rate of complications have been studied. While the number of complications was very low, we have observed that all the major hemorrhages were immediate when the blended current was used, but delayed when the pure coagulation current was applied. Endoscopic laser photocavitation is a valuable palliative method treating rectal adenocarcinoma in well selected patients. Indeed, if the patients survive sufficiently long after initial therapy, it becomes increasingly difficult to achieve persistent palliation with laser therapy.

  19. Method of reactor operation

    International Nuclear Information System (INIS)

    Nakajima, Takeshi

    1988-01-01

    Purpose: To minimize the power change due to the increase in xenone and power distribution after reaching the rated power in the case of using fresh fuels no requiring conditioning operation thereby starting the nuclear reactor in a short period of time and stably. Method: When control rods are entirely inserted only with a purpose for the compensation of the reactivity in a xenon-unsaturated state such as upon starting of the nuclear reactor, peaking is generated in the lower portion of the reactor core. Therefore, it is necessary to insert control rods for additionally suppressing the peaking in the lower portion of the reactor core to a relatively shallow level. In view of the above, a plurality of control rods are divided into a first control rod group finally inserted in the rated power state and a second control rod group other than the above. Then, the power is once elevated to the rated power level by means of such an intermediate control rod pattern that the ratio of the total extraction amount between the first control rod group and the second control rod group is made constant. Then, the control rods are extracted stepwise while setting the ratio of the total extraction amount constant in accordance with the change of the accumulating amount of xenone, to thereby obtain the purpose. (kamimura, M.)

  20. [Operative vaginal deliveries training].

    Science.gov (United States)

    Dupuis, O

    2008-12-01

    The appropriate use of forceps, vacuums or spatulas facilitates the rapid delivery of foetuses faced with life-threatening situations. It also makes possible the relief of certain cases of prolonged second-stage labor. In France, operative vaginal delivery (OVD) accounts for approximately 10% of all births. OVD training aims to optimize maternal, as well as neonatal safety. It should enable trainees to indicate or contraindicate an OVD safely, as well as to choose the appropriate instrument, use it correctly, and master quality control principles. Traditional OVD training is confronted with both spatial and time-related limitations. Spatial constraints involve both the teacher and trainee who only have limited visual access to the pelvic canal, and the head of the foetus; the time constraint occurs whenever the OVD occurs in an emergency setting. These limitations have been further aggravated by new constraints: decreasing time dedicated to training (European safety rules prohibit work the day after night duty), increasing litigation, and constraints imposed by society. Training by means of simulation removes such limitations making it possible to both avoid exposing pregnant women to the hazards of traditional training, and adapt the training to the skills of each trainee. OVD training should include forceps, vacuums and the use of spatulas. The OVD skills of obstetricians should be audited regularly on both a personal and a confidential level. Such audits could be based on a method using a simulator. Prospective studies comparing traditional and simulation-based training should be encouraged.