WorldWideScience

Sample records for backup power upgrades

  1. 47 CFR 12.2 - Backup power.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Backup power. 12.2 Section 12.2 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL REDUNDANCY OF COMMUNICATIONS SYSTEMS § 12.2 Backup power..., must have an emergency backup power source (e.g., batteries, generators, fuel cells) for all...

  2. Backup Power Cost of Ownership Analysis and Incumbent Technology Comparison

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, J.; Saur, G.; Sprik, S.; Ainscough, C.

    2014-09-01

    This cost of ownership analysis identifies the factors impacting the value proposition for fuel cell backup power and presents the estimated annualized cost of ownership for fuel cell backup power systems compared with the incumbent technologies of battery and diesel generator systems. The analysis compares three different backup power technologies (diesel, battery, and fuel cell) operating in similar circumstances in four run time scenarios (8, 52, 72, and 176 hours).

  3. Accelerating Acceptance of Fuel Cell Backup Power Systems - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Petrecky, James; Ashley, Christopher

    2014-07-21

    Since 2001, Plug Power has installed more than 800 stationary fuel cell systems worldwide. Plug Power’s prime power systems have produced approximately 6.5 million kilowatt hours of electricity and have accumulated more than 2.5 million operating hours. Intermittent, or backup, power products have been deployed with telecommunications carriers and government and utility customers in North and South America, Europe, the United Kingdom, Japan and South Africa. Some of the largest material handling operations in North America are currently using the company’s motive power units in fuel cell-powered forklifts for their warehouses, distribution centers and manufacturing facilities. The low-temperature GenSys fuel cell system provides remote, off-grid and primary power where grid power is unreliable or nonexistent. Built reliable and designed rugged, low- temperature GenSys delivers continuous or backup power through even the most extreme conditions. Coupled with high-efficiency ratings, low-temperature GenSys reduces operating costs making it an economical solution for prime power requirements. Currently, field trials at telecommunication and industrial sites across the globe are proving the advantages of fuel cells—lower maintenance, fuel costs and emissions, as well as longer life—compared with traditional internal combustion engines.

  4. Hydrogen Fuel Cell Performance as Telecommunications Backup Power in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sprik, Sam [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-03-01

    Working in collaboration with the U.S. Department of Energy (DOE) and industry project partners, the National Renewable Energy Laboratory (NREL) acts as the central data repository for the data collected from real-world operation of fuel cell backup power systems. With American Recovery and Reinvestment Act of 2009 (ARRA) co-funding awarded through DOE's Fuel Cell Technologies Office, more than 1,300 fuel cell units were deployed over a three-plus-year period in stationary, material handling equipment, auxiliary power, and backup power applications. This surpassed a Fuel Cell Technologies Office ARRA objective to spur commercialization of an early market technology by installing 1,000 fuel cell units across several different applications, including backup power. By December 2013, 852 backup power units out of 1,330 fuel cell units deployed were providing backup service, mainly for telecommunications towers. For 136 of the fuel cell backup units, project participants provided detailed operational data to the National Fuel Cell Technology Evaluation Center for analysis by NREL's technology validation team. NREL analyzed operational data collected from these government co-funded demonstration projects to characterize key fuel cell backup power performance metrics, including reliability and operation trends, and to highlight the business case for using fuel cells in these early market applications. NREL's analyses include these critical metrics, along with deployment, U.S. grid outage statistics, and infrastructure operation.

  5. 77 FR 28797 - Redundancy of Communications Systems: Backup Power Private Land Mobile Radio Services: Selection...

    Science.gov (United States)

    2012-05-16

    ..., Communications common carriers, Communications equipment, Radio, Telecommunications, Telephone, Television... From the Federal Register Online via the Government Publishing Office FEDERAL COMMUNICATIONS COMMISSION 47 CFR Parts 12 and 90 Redundancy of Communications Systems: Backup Power Private Land...

  6. Backup power working group best practices handbook for maintenance and operation of engine generators, Volume 1. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Gross, R.; Padgett, A.B.; Burrows, K.P.; Fairchild, P.N.; Lam, T.; Janes, J.

    1997-06-01

    This handbook is divided into the four chapters. Chapter one covers the design, procurement, storage, handling and testing of diesel fuel oil to be used in DOE backup power supplies. Chapter two discusses the selection of automatic transfer switches to be used in DOE backup power supplies. Chapter three is about low voltage open frame air circuit breaker operation, testing, and maintenance for DOE backup power supplies. And chapter four covers installation, design, and maintenance of engine cooling water and jacket water systems.

  7. Reliability considerations of a fuel cell backup power system for telecom applications

    Science.gov (United States)

    Serincan, Mustafa Fazil

    2016-03-01

    A commercial fuel cell backup power unit is tested in real life operating conditions at a base station of a Turkish telecom operator. The fuel cell system responds to 256 of 260 electric power outages successfully, providing the required power to the base station. Reliability of the fuel cell backup power unit is found to be 98.5% at the system level. On the other hand, a qualitative reliability analysis at the component level is carried out. Implications of the power management algorithm on reliability is discussed. Moreover, integration of the backup power unit to the base station ecosystem is reviewed in the context of reliability. Impact of inverter design on the stability of the output power is outlined. Significant current harmonics are encountered when a generic inverter is used. However, ripples are attenuated significantly when a custom design inverter is used. Further, fault conditions are considered for real world case studies such as running out of hydrogen, a malfunction in the system, or an unprecedented operating scheme. Some design guidelines are suggested for hybridization of the backup power unit for an uninterrupted operation.

  8. Zinc Bromide Flow Battery Installation for Islanding and Backup Power

    Science.gov (United States)

    2016-09-18

    75 Figure 5-41: Clouds forming in the southwestern sky ...sizing Renewable Energy (RE) generation in order to demonstrate progress towards reaching Net Zero operation; e.g. a Military installation that produces...will come from renewable sources. Power from Renewable Sources •By 2020, 50% of installations will be net -zero consumers.Net-zero installations

  9. Lithium Ion Battery Chemistries from Renewable Energy Storage to Automotive and Back-up Power Applications

    DEFF Research Database (Denmark)

    Stan, Ana-Irina; Swierczynski, Maciej Jozef; Stroe, Daniel Ioan;

    2014-01-01

    Lithium ion (Li-ion) batteries have been extensively used in consumer electronics because of their characteristics, such as high efficiency, long life, and high gravimetric and volumetric energy. In addition, Li-ion batteries are becoming the most attractive candidate as electrochemical storage...... systems for stationary applications, as well as power source for sustainable automotive and back-up power supply applications. This paper gives an overview of the Li-ion battery chemistries that are available at present in the market, and describes the three out of four main applications (except...... the consumers’ applications), grid support, automotive, and back-up power, for which the Li-ion batteries are suitable. Each of these applications has its own specifications and thus, the chemistry of the Li-ion battery should be chosen to fulfil the requirements of the corresponding application. Consequently...

  10. Lithium Ion Battery Chemistries from Renewable Energy Storage to Automotive and Back-up Power Applications

    DEFF Research Database (Denmark)

    Stan, Ana-Irina; Swierczynski, Maciej Jozef; Stroe, Daniel Ioan

    2014-01-01

    Lithium ion (Li-ion) batteries have been extensively used in consumer electronics because of their characteristics, such as high efficiency, long life, and high gravimetric and volumetric energy. In addition, Li-ion batteries are becoming the most attractive candidate as electrochemical storage...... systems for stationary applications, as well as power source for sustainable automotive and back-up power supply applications. This paper gives an overview of the Li-ion battery chemistries that are available at present in the market, and describes the three out of four main applications (except...... the consumers’ applications), grid support, automotive, and back-up power, for which the Li-ion batteries are suitable. Each of these applications has its own specifications and thus, the chemistry of the Li-ion battery should be chosen to fulfil the requirements of the corresponding application. Consequently...

  11. ALICE upgrades its powerful eyes

    CERN Multimedia

    Yuri Kharlov, ALICE Collaboration

    2013-01-01

    The ALICE Photon Spectrometer (PHOS) is a high-resolution photon detector that measures the photons coming out of the extremely hot plasma created in the lead-lead collisions at the LHC. Taking advantage of the long accelerator shut-down, the ALICE teams are now repairing and upgrading the existing modules and getting ready to install the brand-new module in time for the next run. The upgraded PHOS detector will be faster and more stable with wider acceptance and improved photon identification.   PHOS crystal matrix during repair. The key feature and the main complexity of the ALICE PHOS detector is that it operates at a temperature of -25°C, which makes it the second-coldest equipment element at the LHC after the cryogenic superconducting magnets. Since 2009 when it was installed, the PHOS detector, with its cold and warm volumes, has been immersed in airtight boxes to avoid condensation in the cold volumes. The 10,752 lead tungstate crystals of the PHOS were completely insulated fr...

  12. Fuel Cell Backup Power Unit Configuration and Electricity Market Participation: A Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Ma, Zhiwen [National Renewable Energy Lab. (NREL), Golden, CO (United States); Eichman, Josh [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kurtz, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-03-13

    This National Renewable Energy Laboratory industry-inspired Laboratory Directed Research and Development project evaluates the feasibility and economics of using fuel cell backup power systems in cell towers to provide grid services (e.g., balancing, ancillary services, demand response). The work is intended to evaluate the integration of thousands of under-utilized, clean, efficient, and reliable fuel cell systems that are already installed in cell towers for potential grid and ancillary services.

  13. Characteristics of a lithium-thionyl chloride battery as a memory back-up power source

    Science.gov (United States)

    Iwamaru, T.; Uetani, Y.

    An Li/SOCl 2 battery of R6 size (ER6C) has been evaluated as a memory back-up power source for CMOS RAM. The working voltage is 3.6 V and the discharge capacity is 1900 mA h on a 1OK-ohm load. The cell exhibits satisfactory working voltage and discharge capacity over the temperature range -40 °C to 85 °C. The discharge reaction mechanism has been elucidated. Cumulative self discharge during 10 years discharge at 20 μA is estimated to be 3.5%. No serious problems have been observed during abuse tests.

  14. Geotechnical assessments of upgrading power transmission lines

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Andrew [Coffey Geotechnics Ltd., Harrogate (United Kingdom)

    2012-11-01

    One of the consequences of increasing demand for energy is a corresponding requirement for increased energy distribution. This trend is likely to be magnified by the current tendency to generate power in locations remote from centres of population. New power transmission routes are expensive and awkward to develop, and there are therefore benefits to be gained by upgrading existing routes. However, this in turn raises problems of a different nature. The re-use of any structure must necessarily imply the acceptance of unknowns. The upgrading of transmission lines is no exception to this, particularly when assessing foundations, which in their nature are not visible. A risk-based approach is therefore used. This paper describes some of the geotechnical aspects of the assessment of electric power transmission lines for upgrading. It briefly describes the background, then discusses some of the problems encountered and the methods used to address them. These methods are based mainly on information obtained from desk studies and walkover surveys, with a limited amount of intrusive investigation. (orig.)

  15. Backup & Recovery

    CERN Document Server

    Preston, W

    2009-01-01

    Packed with practical, freely available backup and recovery solutions for Unix, Linux, Windows, and Mac OS X systems -- as well as various databases -- this new guide is a complete overhaul of Unix Backup & Recovery by the same author, now revised and expanded with over 75% new material.

  16. Performance model to assist solar thermal power plant siting in northern Chile based on backup fuel consumption

    Energy Technology Data Exchange (ETDEWEB)

    Larrain, Teresita; Escobar, Rodrigo; Vergara, Julio [Departamento de Ingenieria Mecanica y Metalurgica, Pontificia Universidad Catolica de Chile, Vicuna Mackenna 4860, Macul, Santiago (Chile)

    2010-08-15

    In response to environmental awareness, Chile introduced sustainability goals in its electricity law. Power producers must deliver 5% from renewable sources by 2010 and 10% by 2024. The Chilean desert has a large available surface with one of the highest radiation levels and clearest skies in the World. These factors imply that solar power is an option for this task. However, a commercial plant requires a fossil fuel system to backup the sunlight intermittency. The authors developed a thermodynamical model to estimate the backup fraction needed in a 100 MW hybrid -solar-fossil- parabolic trough power plant. This paper presents the model aiming to predicting the performance and exploring its usefulness in assisting site selection among four locations. Since solar radiation data are only available in a monthly average, we introduced two approaches to feed the model. One data set provided an average month with identical days throughout and the other one considered an artificial month of different daylight profiles on an hourly basis for the same monthly average. We recommend a best plant location based on minimum fossil fuel backup, contributing to optimal siting from the energy perspective. Utilities will refine their policy goals more closely when a precise solar energy data set becomes available. (author)

  17. Intelligent uninterruptible power supply system with back-up fuel cell/battery hybrid power source

    Science.gov (United States)

    Zhan, Yuedong; Guo, Youguang; Zhu, Jianguo; Wang, Hua

    2008-05-01

    This paper presents the development of an intelligent uninterruptible power supply (UPS) system with a hybrid power source that comprises a proton-exchange membrane fuel cell (PEMFC) and a battery. Attention is focused on the architecture of the UPS hybrid system and the data acquisition and control of the PEMFC. Specifically, the hybrid UPS system consists of a low-cost 60-cell 300 W PEMFC stack, a 3-cell lead-acid battery, an active power factor correction ac-dc rectifier, a half-bridge dc-ac inverter, a dc-dc converter, an ac-dc charger and their control units based on a digital signal processor TMS320F240, other integrated circuit chips, and a simple network management protocol adapter. Experimental tests and theoretical studies are conducted. First, the major parameters of the PEMFC are experimentally obtained and evaluated. Then an intelligent control strategy for the PEMFC stack is proposed and implemented. Finally, the performance of the hybrid UPS system is measured and analyzed.

  18. CanDan 2, phase 2. Final report. [Fuel cell systems for back-up power and materials handling applications]; CanDan 2, fase 2. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-11-01

    CanDan 2 Phase 2 is the second phase of a research and demonstration project for fuel cell backup power systems and fuel cell powered material handling equipment. In the Backup Power segment the fuel cell units have been developed, certified and delivered. A total of 32 fuel cell backup power systems have been delivered for EnergiMidt and in operation since early 2011. Following this project EnergiMidt has purchased another 31 systems in order to make a full transition from battery backup to fuel cell backup in their entire broadband network. In the material handling segment a 10 kW fuel cell system has been fully integrated in the fork lift truck, Dantruck 3000 Power Hydrogen. The result was a much more commercially mature product than expected from the beginning of the project. The result is a finished 2,5T fork lift truck which was presented at the CE-mat fair in April 2011. (LN)

  19. Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments

    Energy Technology Data Exchange (ETDEWEB)

    Crew, James F. [Southern Company Generation, Birmingham, AL (United States). Hydro Services; Johnson, Herbie N. [Southern Company Generation, Birmingham, AL (United States). Hydro Services

    2015-03-31

    From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

  20. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  1. An analysis of thermionic space nuclear reactor power system: II. Merits of using safety drums for backup control

    Science.gov (United States)

    El-Genk, Mahomed S.; Xue, Huimin

    1993-01-01

    An analysis is performed to investigate the merits of using the TOPAZ-II safety drums for a backup control to prevent a reactivity excursion, stabilize the reactor, and achieve steady-state power operation, following a severe hypothetical reactivity initiated accident (RIA). Such an RIA is assumed to occur during the system start-up in orbit due to a malfunction of the drive mechanism of the control drums, causing the nine drums to accidentally rotate the full 180° outward. Results show that an immediate, inward rotation of the three safety drums to an angle of 80° will shutdown the reactor, however, a delay time of 10 s will not only prevents a reactivity excursion, but also enables operating the reactor at a steady-state thermal power of about 33.3 kW (0.9 kW per TFE). Conversely, when the immediate rotation of the safety drums is to a larger angle of 100°, a steady-state operation at about 37 kW can be achieved, but a delay of 10 s causes a reactivity excursion and overheating of the TFEs. It is therefor concluded that, should the drive mechanism be modified to enable rotating the safety drums for TOPAZ-II reactor at variable speeds of and below 22.5°/s, the three safety drums could be used successfully for a backup control, following an RIA. However, since the reactivity worth of the three safety drums is only 2.0, the maximum steady-state electric power achievable for the system is limited to approximately 0.25 kW, at which the fission power is about 37 kW and the emitter temperature is approximaely 1500 K. To alleviate such a limitation and enable operation at nominal design conditions (fission power of about 107 kW or a system's total electric power of 5.6 kW), the reactivity worth of the safety drums would have to be increased by at least 0.24. An additional increase in the safety drums' worth will also be necessary to maintain steady-state operation of the system at nominal conditions throughout the mission lifetime, with all nine control drums fully

  2. A number of upgrades on RHIC power supply system

    Energy Technology Data Exchange (ETDEWEB)

    Mi, C. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Bruno, D. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Drozd, J. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Nolan, T. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Orsatti, F. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Heppener, G. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Di Lieto, A. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Schultheiss, C. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Samms, T. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Zapasek, R. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.; Sandberg, J. [Brookhaven National Lab. (BNL), Upton, NY (United States). Collider-Accelerator Dept.

    2015-05-03

    This year marks the 15th run for the Relativistic Heavy Ion Collider (RHIC). Operation of a reliable superconducting magnet power supply system is a key factor of an accelerator’s performance. Over the past 15 years, the RHIC power supply group has made many improvements to increase the machine availability and reduce failures. During these past 15 years of operating RHIC a lot of problems have been solved or addressed. In this paper some of the essential upgrades/improvements are discussed.

  3. Upgrading of seismic design of nuclear power plant building

    Energy Technology Data Exchange (ETDEWEB)

    Akiyama, Hiroshi [Tokyo Univ. (Japan). Faculty of Engineering; Kitada, Yoshio

    1997-03-01

    In Japan seismic design methodology of nuclear power plant (NPP) structures has been established as introduced in the previous session. And yet efforts have been continued to date to upgrade the methodology, because of conservative nature given to the methodology in regard to unknown phenomena and technically-limited modeling involved in design analyses. The conservative nature tends to produce excessive safety margins, and inevitably send NPP construction cost up. Moreover, excessive seismic design can increase the burden on normal plant operation, though not necessarily contributing to overall plant safety. Therefore, seismic engineering has put to many tests and simulation analyses in hopes to rationalize seismic design and enhance reliability of seismic safety of NPPs. In this paper, we describe some studies on structural seismic design of NPP underway as part of Japan`s effort to upgrade existing seismic design methodology. Most studies described here are carried out by NUPEC (Nuclear Power Engineering Company) funded by MITI (the Ministry of International Trade and Industry Japan), though, similar studies with the same motive are also carrying out by nuclear industries such as utilities, NPP equipment and system manufacturers and building constructors. This paper consists of three sections, each introducing studies relating to NPP structural seismic design, new siting technology, and upgrading of the methodology of structural design analyses. (J.P.N.)

  4. DC-DC powering for the CMS pixel upgrade

    Science.gov (United States)

    Feld, Lutz; Fleck, Martin; Friedrichs, Marcel; Hensch, Richard; Karpinski, Waclaw; Klein, Katja; Rittich, David; Sammet, Jan; Wlochal, Michael

    2013-12-01

    The CMS experiment plans to replace its silicon pixel detector with a new one with improved rate capability and an additional detection layer at the end of 2016. In order to cope with the increased number of detector modules the new pixel detector will be powered via DC-DC converters close to the sensitive detector volume. This paper reviews the DC-DC powering scheme and reports on the ongoing R&D program to develop converters for the pixel upgrade. Design choices are discussed and results from the electrical and thermal characterisation of converter prototypes are shown. An emphasis is put on system tests with up to 24 converters. The performance of pixel modules powered by DC-DC converters is compared to conventional powering. The integration of the DC-DC powering scheme into the pixel detector is described and system design issues are reviewed.

  5. DC-DC Powering for the CMS Pixel Upgrade

    CERN Document Server

    Feld, Lutz Werner; Marcel Friedrichs; Richard Hensch; Karpinski, Waclaw; Klein, Katja; Rittich, David Michael; Sammet, Jan Domenik; Wlochal, Michael

    2013-01-01

    The CMS experiment plans to replace its silicon pixel detector with a new one with improved rate capability and an additional detection layer at the end of 2016. In order to cope with the increased number of detector modules the new pixel detector will be powered via DC-DC converters close to the sensitive detector volume. This paper reviews the DC-DC powering scheme and reports on the ongoing R and D program to develop converters for the pixel upgrade. Design choices are discussed and results from the electrical and thermal characterisation of converter prototypes are shown. An emphasis is put on system tests with up to24 converters. The performance of pixel modules powered by DC-DC converters is compared to conventional powering. The integration of the DC-DC powering scheme into the pixel detector is described and system design issues are reviewed.

  6. DC–DC powering for the CMS pixel upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Feld, Lutz, E-mail: Lutz.Feld@rwth-aachen.de; Fleck, Martin; Friedrichs, Marcel; Hensch, Richard; Karpinski, Waclaw; Klein, Katja; Rittich, David; Sammet, Jan; Wlochal, Michael

    2013-12-21

    The CMS experiment plans to replace its silicon pixel detector with a new one with improved rate capability and an additional detection layer at the end of 2016. In order to cope with the increased number of detector modules the new pixel detector will be powered via DC–DC converters close to the sensitive detector volume. This paper reviews the DC–DC powering scheme and reports on the ongoing R and D program to develop converters for the pixel upgrade. Design choices are discussed and results from the electrical and thermal characterisation of converter prototypes are shown. An emphasis is put on system tests with up to 24 converters. The performance of pixel modules powered by DC–DC converters is compared to conventional powering. The integration of the DC–DC powering scheme into the pixel detector is described and system design issues are reviewed.

  7. UPGRADES

    CERN Multimedia

    J. Butler and J. Nash

    2011-01-01

    Recent progress on the CMS upgrades was summarised, in a workshop held at Fermilab between 7th and 10th November, attended by more than 150 people, many of whom came from Europe and Asia. Important goals of the workshop were to begin to formulate a schedule for the upgrades and to determine project interdependencies. Input was received from all the upgrade working groups and will be combined into a first-pass schedule over the next several weeks. In addition, technical progress on each of the major subtasks was presented and plans for the near-term future were established. Slides from the more than 100 talks are located at: https://indico.cern.ch/conferenceDisplay.py?confId=153564 In the opening plenary session, Frank Zimmermann, of the CERN Beams Department, gave his view of the LHC luminosity evolution. The luminosity will increase faster than we assumed in designing the upgrades. CMS will need to re-evaluate the current upgrade plans and revise them if necessary. CMS Upgrade Physics coordinator...

  8. Degradation Effect on Reliability Evaluation of Aluminum Electrolytic Capacitor in Backup Power Converter

    DEFF Research Database (Denmark)

    Zhou, Dao; Wang, Huai; Blaabjerg, Frede

    2017-01-01

    DC capacitors in power electronic converters are a major constraint on improvement of power density as well as reliability. In this paper, according to the degradation data of electrolytic capacitors through the accelerated test, the time-to-failure of the capacitor cell is acquired and it can be...

  9. Greenhouse gas emissions from operating reserves used to backup large-scale wind power.

    Science.gov (United States)

    Fripp, Matthias

    2011-11-01

    Wind farms provide electricity with no direct emissions. However, their output cannot be forecasted perfectly, even a short time ahead. Consequently, power systems with large amounts of wind power may need to keep extra fossil-fired generators turned on and ready to provide power if wind farm output drops unexpectedly. In this work, I introduce a new model for estimating the uncertainty in short-term wind power forecasts, and how this uncertainty varies as wind power is aggregated over larger regions. I then use this model to estimate the reserve requirements in order to compensate for wind forecast errors to a 99.999% level of reliability, and an upper limit on the amount of carbon dioxide that would be emitted if natural gas power plants are used for this purpose. I find that for regions larger than 500 km across, operating reserves will undo 6% or less of the greenhouse gas emission savings that would otherwise be expected from wind power.

  10. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A. [IVO Power Engineering Ltd., Vantaa (Finland)

    1997-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  11. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    There is very good progress in the execution of the LS1 projects and in launching construction of the Phase 1 upgrades. We focus here on two main achievements since the last CMS Week. The approval of the third Phase 1 TDR The preparation of the L1 Trigger Upgrade Technical Design Report has been a major effort of the collaboration at the beginning of this year, especially to develop supporting Trigger menu and physics performance studies. These studies have demonstrated the efficiency of the upgraded system to ensure low lepton and jet trigger thresholds, leading to a significant increase of the acceptance for the Higgs measurements, in the associated production mode and in the ττ decays, as well as for the stop searches involving multiple jets in the final state. The TDR was submitted to the LHCC in May and approved at the June committee meeting. It is now a public document, completing the series of the three TDRs describing the Phase 1 upgrades, with the new Pixel system and the HCAL rea...

  12. Making the grid the backup: Utility applications for fuel cell power

    Energy Technology Data Exchange (ETDEWEB)

    Eklof, S.L. [Sacramento Municipal Utility District (SMUD), Sacramento, CA (United States)

    1996-12-31

    Fuel cells are recognized as a versatile power generation option and accepted component of SMUD`s ART Program. SMUD has received wide support and recognition for promoting and implementing fuel cell power plants, as well as other innovative generation, based primarily on technological factors. Current economic and technical realities in the electric generation market highlight other important factors, such as the cost involved to develop a slate of such resources. The goal now is to develop only those select quality resources most likely to become commercially viable in the near future. The challenge becomes the identification of candidate technologies with the greatest potential, and then matching the technologies with the applications that will help to make them successful. Utility participation in this development is critical so as to provide the industry with case examples of advanced technologies that can be applied in a way beneficial to both the utility and its customers. The ART resource acquisitions provide the experience base upon which to guide this selection process, and should bring about the cost reductions and reliability improvements sought.

  13. RF Power Upgrade for CEBAF at Jefferson Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Andrew Kimber,Richard Nelson

    2011-03-01

    Jefferson Laboratory (JLab) is currently upgrading the 6GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12GeV. As part of the upgrade, RF systems will be added, bringing the total from 340 to 420. Existing RF systems can provide up to 6.5 kW of CW RF at 1497 MHZ. The 80 new systems will provide increased RF power of up to 13 kW CW each. Built around a newly designed and higher efficiency 13 kW klystron developed for JLab by L-3 Communications, each new RF chain is a completely revamped system using hardware different than our present installations. This paper will discuss the main components of the new systems including the 13 kW klystron, waveguide isolator, and HV power supply using switch-mode technology. Methodology for selection of the various components and results of initial testing will also be addressed. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

  14. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    The three post-LS1 Phase 1 Upgrade projects (the L1-Trigger, Pixel Tracker, and HCAL) are all making excellent progress and are transitioning from the prototype to the execution phase. Meanwhile plans are developing for Phase 2, a major Upgrade programme targeting the third long shutdown, LS3. News on Phase 1 is included under the respective projects; we only provide a brief summary here. Phase 1 The plan for the L1 Trigger relies on the installation during the present shutdown of optical splitting for the Trigger input signals. This will allow the new Trigger system to be brought online and fully commissioned during beam operation in 2015, while CMS relies on the existing legacy Trigger for physics. Once fully commissioned the experiment can switch over to the new Trigger, which will provide greatly improved performance at high event pile-up, by 2016. System tests of the splitter system, and of the new architecture of the calorimeter trigger were very successful, and the work in LS1 is on-track. Prototype ...

  15. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2012-01-01

      Good progress is being made on the projects that will be installed during LS1. CSC chamber production for ME4/2 is progressing at a rate of four chambers per month, with 25 built so far, and the new electronics for ME1/1 is undergoing a pre-production integration testing. For the RPC chambers, gap production is underway with first deliveries to the chamber assembly sites at CERN and Ghent. The third site at Mumbai will begin production next month. For the PMT replacement in the forward hadron calorimeters (HF), the 1728 PMTs are all characterised and ready to be installed. Testing of the electronics boards is going well. Preparations to replace the HPDs in the outer calorimeter (HO) with SiPMs are also on-track. All components are at CERN and burn-in of the new front-end electronics is proceeding. There are three major upgrade projects targeting the period from LS1 through LS2: a new pixel detector, upgraded photo-detectors and electronics for HCAL, and development of a new L1 Trigger. The new ...

  16. UPGRADES

    CERN Multimedia

    Didier Contardo

    2012-01-01

      The CMS Upgrade Programme is making good progress on the LS1 and Phase 1 projects, in the planning for Phase 2. The construction of the ME4/2 muon chambers to be installed during LS1 has started and the two first CSC production chambers have been fully qualified. The three muon groups have recently established a set of milestones towards the completion of their project, that will be integrated in the detailed planning and scheduling for the shutdown work established by Technical Coordination. The project to replace the photo-detectors in the HF and HO calorimeters is also well advanced and at the validation stage. The operation of an HF slice with new multi-anode PMTs and back-end electronics has already been demonstrated in 2012. For the Phase 1 data-taking, as discussed in the Chamonix workshop, it is likely that the LHC performance will exceed the nominal luminosity and pile-up before the second shutdown, still scheduled in 2018. The collaboration is therefore pursuing a strategy to upgrade ...

  17. Accountability for network backup failures

    Energy Technology Data Exchange (ETDEWEB)

    Benson, W.H.

    1994-02-01

    Regular hard disk backups for workstations are widely recommended. The necessity of backups -- akin to one`s own mortality -- is something most people would rather not think about. This attitude has two consequences. When people do subscribe to automated network backups, they expect the system to perform at a high level of reliability and that their files will be there for them when they need them. Second, they usually fail to appreciate that reliability is a shared responsibility. Although ostensibly their only responsibility is to keep the computer powered on overnight, there are actually many more opportunities for failure within the user`s jurisdiction than in other parts of the infrastructure. High reliability is almost a sine qua non for backups. We describe a strategy for enhancing reliability based on the principle of accountability. This strategy involves monitoring the system, gathering statistics, detecting problems, anticipating problems, troubleshooting, and finally determining where failure occurred within the infrastructure and who should be accountable. We describe a specific backup system in a specific network environment to illustrate the value of accountability. This system, macdumps, backs up Macintosh disks over an AppleTalk network. The original software was written by Dan Tappan of BBN in the early years of the Mac and is available by ftp for noncommercial use. It has proven reliable and robust. Despite the high quality of the fundamental software, there are still many opportunities for failure within the infrastructure. We first discuss accountability in the context of network backups, then briefly describe how the backup system operates, the components of the infrastructure, types of failures experienced, and then summarize our experience.

  18. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

      LS1 and Phase 1 The detector projects targeting LS1 are progressing well, and a fully integrated schedule developed by Technical Coordination includes installation milestones and a detailed work-plan. The first chambers of the RPC system were produced and are being qualified. Production will ramp up this year to a rate of 20 chambers per month. 32 chambers of the CSC system have been fabricated for the ME4/2 CSC stations, and production proceeds at a rate of 4 per month. The new ME1/1 Front-End Board is in production and the off-detector electronics integration tests are ongoing. The new Theta Trigger Boards for the DT readout production is started and the relocation of the Sector Collector boards with new Optical Links as been successfully tested. All the components for the upgrade of the Forward Hadron Calorimeter PMTs have been received at CERN and assemblies are being qualified. The situation is similar for the Hadron Outer Calorimeter new SiPMs and readout modules. Three projects are plan...

  19. Marketing CE approved off-the-shelf FC-operated power backup units for the telecom industry at competitive prices : a continuing success story

    Energy Technology Data Exchange (ETDEWEB)

    Mortensen, P. [Dantherm Power, Skive (Denmark)

    2009-07-01

    Dantherm Power receives a steady supply of fuel cell stacks packed on pallets at its factory in Denmark. Once unpacked, they go to an assembly line to be integrated into power modules designed for telecom- and IT network-base-stations around the world. The CE approved units are designed and tested to meet current telecom standards. Customers can purchase the off-the-shelf units at competitive prices. Dantherm Power has brought fuel-cell technology beyond the research and development stage. Since 2005, the company has sold backup units providing uninterruptible power supply (UPS) to the telecom industry on standard commercial terms. Their fuel cell-based-solutions have proven to be successful. The company began in 2003 as a research and development project within Dantherm Air Handling A/S. Development was driven by the idea that a UPS-system based on hydrogen and fuel-cell-technology may be better solution than traditional battery and diesel driven backup for many of the company's existing clients.

  20. A Total Cost of Ownership Model for Low Temperature PEM Fuel Cells in Combined Heat and Power and Backup Power Applications

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Berkeley; Wei, Max; Lipman, Timothy; Mayyas, Ahmad; Chien, Joshua; Chan, Shuk Han; Gosselin, David; Breunig, Hanna; Stadler, Michael; McKone, Thomas; Beattie, Paul; Chong, Patricia; Colella, Whitney; James, Brian

    2014-06-23

    A total cost of ownership model is described for low temperature proton exchange membrane stationary fuel cell systems for combined heat and power (CHP) applications from 1-250kW and backup power applications from 1-50kW. System designs and functional specifications for these two applications were developed across the range of system power levels. Bottom-up cost estimates were made for balance of plant costs, and detailed direct cost estimates for key fuel cell stack components were derived using design-for-manufacturing-and-assembly techniques. The development of high throughput, automated processes achieving high yield are projected to reduce the cost for fuel cell stacks to the $300/kW level at an annual production volume of 100 MW. Several promising combinations of building types and geographical location in the U.S. were identified for installation of fuel cell CHP systems based on the LBNL modelling tool DER CAM. Life-cycle modelling and externality assessment were done for hotels and hospitals. Reduced electricity demand charges, heating credits and carbon credits can reduce the effective cost of electricity ($/kWhe) by 26-44percent in locations such as Minneapolis, where high carbon intensity electricity from the grid is displaces by a fuel cell system operating on reformate fuel. This project extends the scope of existing cost studies to include externalities and ancillary financial benefits and thus provides a more comprehensive picture of fuel cell system benefits, consistent with a policy and incentive environment that increasingly values these ancillary benefits. The project provides a critical, new modelling capacity and should aid a broad range of policy makers in assessing the integrated costs and benefits of fuel cell systems versus other distributed generation technologies.

  1. Uninterruptible power supply for GSM/UMTS base stations using fuel cells. PEM-FC back-up system - Final report; Unterbrechungsfreie Stromversorgung (USV) fuer GSM/UMTS-Basisstationen mit Brennstoffzellen. PEM-FC Back-Up System - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Trachte, U.; Wellig, B.; Luethi, E.; Gander, T.; Haerri, V.

    2010-06-15

    The Lucerne University of Applied Sciences and Arts - Lucerne School of Engineering and Architecture conducted field tests with an uninterruptible power supply (UPS) with fuel cell technology since January 2006. The project took place in collaboration with the industrial partners Swisscom (Schweiz) AG, as a user of UPS-systems in telecommunications and the American Power Conversion Corporation as a producer and market leader of UPS-Systems. In this project, the lead-acid batteries were replaced by a PEM fuel cell system. The delayed start-up behaviour of the fuel cell was bridged with supercapacitor technology. The system was connected to an existing working base station of a telecommunication installation, which was installed on the roof of the Lucerne School of Engineering and Architecture in Horw. Hydrogen was provided by two pressurized tanks. The full quantity of hydrogen assured a stand-alone operation for about 6 hours under the load of the telecommunication base station. The field test included monthly grid failure simulations of 5x5 minutes and 2x20 minutes power failures. Also during grid failure simulations for more than 4 hours and during two real outages up to one and a half hour the system provided the demanded power. The field test was performed for a period of three and a half years. Excellent results of the approximately 350 start-up's confirm the functionality, reliability and performance of the system. Under the load of the base station the fuel cell system started with a reliability of 100%. At the end of the tests a decrease of the fuel cell voltage of about 3.3% was measured. The fuel cell system was still fully operational at this time. An amount of energy of about 470 kWh was provided. In addition to the field test, the environmental impact of the lead-acid batteries, which are normally used, and of the fuel cell system was investigated. The comparison between the fuel cell system and lead-acid batteries without recycling showed a

  2. Pulsed power supply for Nova Upgrade. Final report, August 1, 1991 to March 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C. [Univ. of Texas, Austin, TX (US). Center for Electromechanics

    1992-12-31

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 {mu}m light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps.

  3. 77 FR 26275 - Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS

    Science.gov (United States)

    2012-05-03

    ... Bonneville Power Administration; Montana-to-Washington Transmission System Upgrade Project EIS AGENCY...``''sts for long-term transmission service. During the NOS process, utilities and power generators (including wind generators and power marketers) requested the use of BPA's transmission system to...

  4. 氢燃料电池在电力系统后备电源的应用研究%Research on Application of H2 Fuel Cell Backup Power System at Transformer Stations for Electric Power System

    Institute of Scientific and Technical Information of China (English)

    张富刚; 樊越甫; 刘方; 刘海东

    2012-01-01

    笔者针对变电站直流系统,应用新型氢燃料后备电源替代蓄电池组作为后备电源产品.旨在将氢燃料电源作为直流系统整体后备电源,氢燃料应急移动直流电源,直流技改中氢燃料后备电源的可行性和解决方案进行测试研究,提出新型后备电源设计、采取措施以及提出一整套系统的解决方案.结果显示,将氢燃料电池供电系统代替铅酸蓄电池组作为停电期间的后备电源,只保留少量的铅酸蓄电池作为系统启动过程中的支撑,停电时自动启动、市电恢复时自动进入待机状态,铅酸电池随即进入浮充状态.大量减少铅酸蓄电池的使用,能减少对环境的污染.氢燃料电池供电系统若包含DC/AC逆变设备,即可为通信站的交流负载供电,替代汽柴油机,降低噪音和振动,减少二氧化碳等气体排放.%This article is aiming to illustrate the replacement of traditional lead-acid battery stacks with Hydrogen fuel cell products as backup power products to provide electricity for substation DC system. The article researches how to use H2 fuel cell power system as a integrated backup energy for DC system, as a removable DC power supply for emergency use, and tests the feasibility of using H2 fuel cell as backup power system during DC technological transformation. The author also proposes new backup power supply design and new solutions for the whole power system. According to such research and analysis, using H2 fuel cell to replace lead acid batteries as backup power system during blackout period can largely reduce CO2 pollution to the environment.

  5. High Power Lasing in the IR Upgrade FEL at Jefferson Lab

    CERN Document Server

    Benson, S V; Behre, Chris; Herman-Biallas, George; Boyce, James; Douglas, David; Dylla, Fred; Evans, Richard; Grippo, A; Gubeli, Joe; Hardy, David; Hernandez-Garcia, Carlos; Jordan, Kevin; Merminga, Lia; Neil, George; Preble, Joe; Shinn, Michelle D; Siggins, Tim; Walker, Richard; Williams, Gwyn; Yunn, Byung; Zhang, Shukui

    2004-01-01

    We report on progress in commissioning the IR Upgrade facility at Jefferson Lab. Operation at high power has been demonstrated at 5.7 microns with over 4 kW of continuous power output and a recirculated electron beam power of up to 800 kW. We report on the features and limitations of the present design and on efforts to increase the power to over 10 kW.

  6. System Implications of the Different Powering Distributions for the ATLAS Upgrade Strips Tracker

    CERN Document Server

    Díez, S

    2012-01-01

    This paper compares the two novel approaches for the power distribution of the ATLAS Upgrade strips tracker modules, serial and DC-DC powering, from the point of view of a system. Numerous variables have been taken into account, such as total power dissipation and power efficiency, system reliability and protection, noise performances, impact on the material budget of the tracker, and services needs and re-usability.

  7. High Power Lasing in the IR Upgrade FEL at Jefferson Lab

    Energy Technology Data Exchange (ETDEWEB)

    Stephen Vincent Benson; Kevin Beard; Chris Behre; George Herman Biallas; James Boyce; David Douglas; Fred Dylla; Richard Evans; Al Grippo; Joe Gubeli; David Hardy; Carlos Hernandez-Garcia; Kevin Jordan; Lia Merminga; George Neil; Joe Preble; Michelle D. Shinn; Tim Siggins; Richard Walker; Gwyn Williams; Byung Yunn; Shukui Zhang

    2004-08-01

    We report on progress in commissioning the IR Upgrade facility at Jefferson Lab. Operation at high power has been demonstrated at 5.7 microns with over 8.5 kW of continuous power output, 10 kW for 1 second long pulses, and CW recirculated electron beam power of over 1.1 MW. We report on the features and limitations of the present design and report on the path to getting even higher powers.

  8. Backup in Windows 7

    CERN Document Server

    2014-01-01

    Creating backups (or safety copies) of files has become increasingly important for many computer users. A growing number of people save important and vital information on their computer. Often this will be business, tax or financial information, but it also can include photos and videos. Nowadays, lots of fond memories and unforgettable moments are recorded onto digital media with photo and video cameras. A few years ago backups were usually created on storage media such as floppy disks, CDs, or DVDs. These types of storage media had one major disadvantage, in that you could only store a s

  9. Backup in Windows 8

    CERN Document Server

    Steps, Studio Visual

    2014-01-01

    Creating backups (or safety copies) of files has become increasingly important for many computer users. A growing number of people save important and vital information on their computer. Often this will be business, tax or financial information, but it also can include photos and videos. Nowadays, lots of fond memories and unforgettable moments are recorded onto digital media with photo and video cameras. A few years ago backups were usually created on storage media such as floppy disks, CDs, or DVDs. These types of storage media had one major disadvantage, in that you could only store a s

  10. Existing large steam power plant upgraded for hydrogen production

    Energy Technology Data Exchange (ETDEWEB)

    Galanti, L.; Franzoni, A.; Traverso, A.; Massardo, A.F. [University of Genoa, Genoa (Italy)

    2011-05-15

    This paper presents and discusses the results of a complete thermoeconomic analysis of an integrated power plant for co-production of electricity and hydrogen via pyrolysis and gasification processes fed by various coals and mixture of coal and biomass, applied to an existing large steam power plant (ENEL Brindisi power plant - 660 MWe). Two different technologies for the syngas production section are considered: pyrolysis process and direct pressurized gasification. Moreover, the proximity of a hydrogen production and purification plants to an existing steam power plant favors the inter-exchange of energy streams, mainly in the form of hot water and steam, which reduces the costs of auxiliary equipment. The high quality of the hydrogen would guarantee its usability for distributed generation and for public transport. The results were obtained using WTEMP thermoeconomic software, developed by the Thermochemical Power Group of the University of Genoa, and this project has been carried out within the framework of the FISR National project 'Integrated systems for hydrogen production and utilization in distributed power generation'.

  11. ATF CO{sub 2} laser system upgrade to terawatt peak power

    Energy Technology Data Exchange (ETDEWEB)

    Pogorelsky, I.V.

    1995-05-01

    This document describes the proposed upgrade of the 10-GW peak power 50-ps CO{sub 2} laser presently operational at the ATF to the 1 TW level at a shorter, 3--10 ps, pulse duration. The approach adopted is based on state of the art CO{sub 2} laser technology and an experience gained in the course of the ATF laser design and application for the laser accelerator experiment. The proposed upgrade is an economical way for the ATF to become in a short time among leading users facilities available for next generation ({ge} 100 MeV) laser accelerator studies.

  12. Upgrading to lead firm position via international acquisition: learning from the global biomass power plant industry

    DEFF Research Database (Denmark)

    Hansen, Ulrich Elmer; Fold, Niels; Hansen, Teis

    2016-01-01

    This article examines the case of a Chinese firm that has upgraded to lead firm position in the global biomass power plant industry mainly through acquisitions of technological frontier firms in Denmark. Sustaining the lead firm position was, however, challenged by difficulties in developing...... innovative capability. Drawing on the literature on (i) firm-level technological capability and (ii) knowledge transfer in international acquisitions, we explain the reasons for insufficient innovative capability building. Based on these empirical findings, we suggest maintaining the existing upgrading...

  13. Invensys solution for a complete digital I and C system upgrade for a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Meter, L. [Invensys Process Systems, M/S C42-2A, 33 Commercial Street, Foxboro, MA 02035 (United States)

    2006-07-01

    Currently, Invensys is executing a number of digital I and C upgrade projects (both safety and non-safety related) at a number of US and overseas Nuclear Power Plants (NPP). In addition Invensys is in the final shipment stage of Lungmen, NPP project, where its scope consisted of Balance of Plant Distributed Control Information System (DCIS), including Plant Computer System (PCS). This article describes the approach and details of Invensys DCIS architecture, which is used in parts throughout various upgrade projects as well as in its entirety for a complete NPP DCIS. (authors)

  14. ATF CO{sub 2} laser system upgrade to terawatt peak power

    Energy Technology Data Exchange (ETDEWEB)

    Pogorelsky, I.V.

    1995-05-01

    This document describes the proposed upgrade of the 10-GW peak power 50-ps CO{sub 2} laser presently operational at the ATF to the 1 TW level at a shorter, 3--10 ps, pulse duration. The approach adopted is based on state of the art CO{sub 2} laser technology and an experience gained in the course of the ATF laser design and application for the laser accelerator experiment. The proposed upgrade is an economical way for the ATF to become in a short time among leading users facilities available for next generation ({ge} 100 MeV) laser accelerator studies.

  15. 2010 Manufacturing Readiness Assessment Update to the 2008 Report for Fuel Cell Stacks and Systems for the Backup Power and Materials Handling Equipment Markets

    Energy Technology Data Exchange (ETDEWEB)

    Wheeler, D.; Ulsh, M.

    2012-08-01

    In 2008, the National Renewable Energy Laboratory (NREL), under contract to the US Department of Energy (DOE), conducted a manufacturing readiness assessment (MRA) of fuel cell systems and fuel cell stacks for back-up power and material handling applications (MHE). To facilitate the MRA, manufacturing readiness levels (MRL) were defined that were based on the Technology Readiness Levels previously established by the US Department of Energy (DOE). NREL assessed the extensive existing hierarchy of MRLs developed by Department of Defense (DoD) and other Federal entities, and developed a MRL scale adapted to the needs of the Fuel Cell Technologies Program (FCTP) and to the status of the fuel cell industry. The MRL ranking of a fuel cell manufacturing facility increases as the manufacturing capability transitions from laboratory prototype development through Low Rate Initial Production to Full Rate Production. DOE can use MRLs to address the economic and institutional risks associated with a ramp-up in polymer electrolyte membrane (PEM) fuel cell production. In 2010, NREL updated this assessment, including additional manufacturers, an assessment of market developments since the original report, and a comparison of MRLs between 2008 and 2010.

  16. Development of emergency backup power system using photovoltaic/wind hybrid power source in unmanned relay broadcasting station; Mujin chukei hosojo ni okeru taihoko/furyoku hybrid dengen wo mochiita hijo yobi dengen system no kaihatsu. 1

    Energy Technology Data Exchange (ETDEWEB)

    Nishikawa, S.; Takanaga, T. [Kandenko Co. Ltd., Tokyo (Japan); Sugimoto, T.; Fujiwara, S. [Japan Broadcasting Corp., Tokyo (Japan)

    1996-02-01

    An examination was made on the application of photovoltaic and wind power generation as an emergency backup power source. In this connection, the designing/manufacturing was carried out for a field demonstration test system, and also a simulation was carried out concerning the system performance. In the structure of the hybrid power source, a wind power generator is parallelly connected to a solar cell through a DC/DC converter for adjusting output voltage. It is further parallelly connected to an existing power system through a switch, supplying power to storage batteries or a broadcasting equipment. The result of the simulation revealed that, in the static characteristics, there was an output from the wind power generation if the wind velocity was 2.4m/s or above, but that a discharge from storage batteries was necessary even in the maximum performance of the wind power generation if the intensity of solar radiation was less than approximately 0.5kW/m{sup 2}. In the dynamic characteristics, an evaluation was made on the length of time of the on-load power supply after a power failure of the system in comparison with the conventional length, depending on the conditions of the wind. 2 refs., 7 figs., 1 tab.

  17. DanDan. Final report. [PEM fuel cells for back-up power and UPS]; DanDan. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-08-15

    The project has provided valuable results for the partners involved, and has resulted in the construction and demonstration of a modular UPS system that can be used with fuel cells. Dantherm Power has provided a 5 kW fuel cell module, based on LT-pem technology, for use in the demonstration and testing facility. The function of the unit is verified by both internal testing and demonstrations from at third parties were it currently is set up to perform tests regarding lifetime. The development of a DC / DC converter, was made. The module has been tested under various conditions, and the development process has resulted in detailed specs of both technique and test process. The module has been tested both in laboratory environment and demonstrated at third parties. The module is part of the systems described in connection with initial test runs - performed at strategic partners - and in connection with the demonstration of the systems both in Japan and in South Africa. The modules are presently in a stage of demonstration, while subjected to substantial service life tests. The purchased reformers are part of the systems used for demonstration in the project and as such they will supply valuable data trough the comprehensive test and verification program initiated. (LN)

  18. DOE Backup Power Working Group Best Practices Handbook for Maintenance and Operation of Engine Generators, Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Gross, R.E.

    1998-10-30

    The lubricating oil system provides a means to introduce a lubricant in the form of a film to reduce friction and wear between surfaces that bear against each other as they move.1 The oil film which is established also cools the parts by carrying generated heat away from hot surfaces, cleans and carries dirt or metal wear particles to the filter media, and helps seal the piston to the cylinder during combustion. Most systems are pressure lubricated and distribute oil under pressure to bearings, gears, and power assemblies. Lubricating oil usually reaches main, connecting rod, and camshaft bearings through drilled passages in the cylinder block and crankshaft or through piping and common manifolds.Many parts rely on oil for cooling, so if the lube oil system fails to perform its function the engine will overheat. Metal to metal surfaces not separated by a thin film of oil rapidly build up frictional heat. As the metals reach their melting point, they tend to weld together in spots or streaks. Lube oil system failures can cause significant damage to an engine in a short period of time. Proper maintenance and operation of the lubricating oil system is essential if your engine is to accomplish its mission.

  19. Constitutional determinants of nuclear power plant upgrading; Verfassungsrechtliche Determinanten bei der Nachruestung von Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Mann, Thomas [Goettingen Univ. (Germany). Lehrstuhl fuer Oeffentliches Recht, insbesondere Verwaltungsrecht; NdsOVG - Niedersaechsisches Oberverwaltungsgericht (Germany)

    2013-11-01

    Around half a year ago the European stress test for nuclear power plants, a precautionary measure initiated by the European Council in March 2011 in response to the Fukushima disaster, revealed that while German nuclear power plants show a high degree of robustness compared with those in other European countries, they nevertheless required upgrading in one or the other respect (earthquake warning systems, protection against crashing civil passenger airplanes). The present article investigates whether this upgrading requirement can justify an injunction to carry out structural retrofitting measures or whether obligations to this end can be excluded on grounds of reasonability in view of the recent decision taken by the German parliament to phase out nuclear energy.

  20. The DC-DC conversion power system of the CMS Phase-1 pixel upgrade

    Science.gov (United States)

    Feld, L.; Karpinski, W.; Klein, K.; Lipinski, M.; Preuten, M.; Rauch, M.; Schmitz, St.; Wlochal, M.

    2015-01-01

    The pixel detector of the CMS experiment will be exchanged during the year-end technical stop in 2016/2017, as part of the experiment's Phase-1 upgrade. The new device will feature approximately twice the number of readout channels, and consequently the power consumption will be doubled. By moving to a DC-DC conversion powering scheme, it is possible to power the new pixel detector with the existing power supplies and cable plant. The power system of the Phase-1 pixel detector is described and the performance of the new components, including DC-DC converters, DC-DC converter motherboards and various power distribution boards, is detailed. The outcome of system tests in terms of electrical behaviour, thermal management and pixel module performance is discussed.

  1. Booster main magnet power supply, present operation and potential future upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Bajon, E.; Bannon, M.; Marneris, I.; Danowski, G.; Sandberg, J.; Savatteri, S.

    2011-03-28

    The Brookhaven Booster Main Magnet Power Supply (MMPS) is a 24 pulse thyristor control supply, rated at 5500 Amps, +/-2000 Volts, or 3000 Amps, +/-6000 Volts. The power supply is fed directly from the power utility and the peak magnet power is 18 MWatts. This peak power is seen directly at the incoming ac line. This power supply has been in operation for the last 18 years. This paper will describe the present topology and operation of the power supply, the feedback control system and the different modes of operation of the power supply. Since the power supply has been in operation for the last 18 years, upgrading this power supply is essential. A new power supply topology has been studied where energy is stored in capacitor banks. DC to DC converters are used to convert the dc voltage stored in the capacitor banks to pulsed DC voltage into the magnet load. This enables the average incoming power from the ac line to be constant while the peak magnet power is pulsed to +/- 18 MWatts. Simulations and waveforms of this power supply will be presented.

  2. Upgrade of the synchronous data management system of the EAST poloidal field power supply

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Lili; Huang, Liansheng, E-mail: huangls@ipp.ac.cn; Fu, Peng; Gao, Ge; He, Shiying

    2016-11-15

    Highlights: • The upgraded synchronous data management system of EAST poloidal field power supply supports long-pulse data storage. • Slice storage mechanism on MDSplus has been adopted for quasi real-time data storage. • The state machine has been adopted for managing the system sequencer. • IEEE-1588 protocol via Ethernet for the synchronization of clock signal was detailed described. - Abstract: Poloidal field (PF) power supply is an important subsystem of the Experimental Advanced Superconducting Tokamak (EAST). The upgrade of the PF control system of EAST is a great improvement over the original data management system which could not meet the requirements necessary for experiments on synchronization, modularity and sampling rate. In order to better analyze the power operation performance, the Synchronization Data Management System (SDMS) needs to be upgraded as well. This upgrade is based on distributed data acquisition and an MDSPLUS database. It consists of three data acquisition nodes synchronized by an reference clock from the EAST central timing system that also provides the start trigger of the EAST pulse. After being processed by a signal conditioning unit, experimental signals are digitized and written into the database in MDSPLUS format. Multi-channel, multi-tasking and continuous data storage have been achieved by using multi-threading technology on a Linux operation system. The SDMS has been used on the server in PF control system for the entire 2015 EAST campaign. The SDMS has had good performance during experiments and convenient human-machine interface to satisfy the requirements of all the experiments.

  3. A DC-DC converter based powering scheme for the upgrade of the CMS pixel detector

    Science.gov (United States)

    Feld, L.; Karpinski, W.; Klein, K.; Merz, J.; Sammet, J.; Wlochal, M.

    2011-11-01

    Around 2016, the pixel detector of the CMS experiment will be upgraded. The amount of current that has to be provided to the front-end electronics is expected to increase by a factor of two. Since the space available for cables is limited, this would imply unacceptable power losses in the currently installed supply cables. Therefore it is foreseen to place DC-DC converters close to the front-end electronics, allowing the provision of power at higher voltages, thereby facilitating the supply of the required currents with the present cable plant. This conference report introduces the foreseen powering scheme of the pixel upgrade. For the first time, system tests have been conducted with pixel barrel sensor modules, radiation tolerant DC-DC converters and the full power supply chain of the pixel detector. In addition, studies of the stability of different powering schemes under various conditions are summarized. In particular the impact of large and fast load variations, which are related to the bunch structure of the LHC beam, has been studied.

  4. Power up-grading study for the first Egyptian research reactor

    Energy Technology Data Exchange (ETDEWEB)

    El-Sawy Temraz, H.; Ashoub, N. E-mail: nageeb@pcn.aea.sci.eg; Fathallah, A

    2001-09-01

    In the present work, power up-grading study is performed, for the first Egyptian Research Reactor (ET-RR-1), using the present fuel basket with 4x4 fuel rods, (17.5 mm pitch), and a proposed fuel basket with 5x5 fuel rods, (14.0 mm pitch), without violating the thermal hydraulic safety criteria. These safety criteria are; fuel centerline temperature (fuel melting), clad surface temperature (surface boiling), outlet coolant temperature, and maximum heat flux (critical heat flux ratio). Different thermal reactor powers (2-10 MW) and different core coolant flow rates (450, 900, 1350 m{sup 3} h{sup -1}) are considered. The thermal hydraulic analysis was performed using the subchannel code COBRA-IIIC for the estimation of temperatures, coolant velocities and critical heat flux. The neutronic calculations were performed using WIMS-D4 code with 5-group neutron cross section library. These cross sections were adapted to use in the two-dimensional (2-D) diffusion code DIXY for core calculations. The study concluded that ET-RR-1 power can be upgraded safely up to 4 MW with the present 4x4-fuel basket and with the proposed 5x5-fuel basket up to 5 MW with the present coolant flow rate (900 m{sup 3} h{sup -1}). With the two fuel arrays, the reactor power can be upgraded to 6 MW with coolant flow rate of 1350 m{sup 3} h{sup -1} without violating the safety criterion. It is also concluded that, loading the ET-RR-1 core with the proposed fuel basket (5x5) increases the excess reactivity of the reactor core than the present 4x4 fuel matrix with equal U-235 mass load and gave better fuel economy of fuel utilization.

  5. The Shunt-LDO regulator to power the upgraded ATLAS pixel detector

    CERN Document Server

    Gonella, L; Hügging, F; Krüger, H; Wermes, N

    2012-01-01

    The shunt-LDO regulator is a new regulator concept which combines a shunt and a Low Drop-Out (LDO) regulator. Designed as an improved shunt regulator to match the needs of serially powered detector systems, it can also be used as a pure LDO regulator for general application in powering schemes requiring linear regulation. The flexibility of the design makes the shunt-LDO regulator a good candidate for use in the powering schemes envisaged for the upgrades of the ATLAS pixel detector. Two shunt-LDO regulators integrated in the prototype of the next ATLAS pixel front-end chip, the FE-I4A, are used to demonstrate the feasibility of the proposed powering solutions.

  6. A HIGH BANDWIDTH BIPOLAR POWER SUPPLY FOR THE FAST CORRECTORS IN THE APS UPGRADE*

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Ju; Sprau, Gary

    2017-06-25

    The APS Upgrade of a multi-bend achromat (MBA) storage ring requires a fast bipolar power supply for the fast correction magnets. The key performance requirement of the power supply includes a small-signal bandwidth of 10 kHz for the output current. This requirement presents a challenge to the design because of the high inductance of the magnet load and a limited input DC voltage. A prototype DC/DC power supply utilizing a MOSFET H-bridge circuit with a 500 kHz PWM has been developed and tested successfully. The prototype achieved a 10-kHz bandwidth with less than 3-dB attenuation for a signal 0.5% of the maximum operating current of 15 amperes. This paper presents the design of the power circuit, the PWM method, the control loop, and the test results.

  7. DC-DC Conversion Powering Schemes for the CMS Tracker Upgrade

    CERN Document Server

    Feld, Lutz; Klein, Katja; Merz, Jennifer; Sammet, Jan; Wlochal,Michael

    2011-01-01

    The CMS experiment foresees upgrades of its silicon pixel and strip detectors for the luminosity upgrade of the Large Hadron Collider (LHC), CERN. Due to an increase in the number of readout channels and higher complexity, larger currents will have to be provided to the detector. Since cable channels are difficult to access and space for cables is limited, this would lead to excessively large resistive power losses in the supply cables, which increase with the current squared. CMS has therefore chosen a novel powering scheme based on DC-DC converters, which allows power to be delivered at a higher voltage and consequently lower current. The development of low-mass, low-noise DC-DC converters for application in CMS is presented, including studies of switching noise, magnetic emissions and power efficiency as well as system tests with silicon strip and pixel modules. A scheme for the integration of DC-DC converters in the silicon pixel detector, currently foreseen to be exchanged around 2016, will be discussed.

  8. A project of upgrading the operations control system of the Hungarian electric power system

    Energy Technology Data Exchange (ETDEWEB)

    Oroszki, L.; Kovacs, G.

    1998-07-01

    About 20 years ago an on-line EMS/SCADA system replaced the previously used off-line control system in the Hungarian power system. The system that has met the technological requirements of that time now became obsolete. A project started in 1995 by the Hungarian Power Companies, Ltd. (MVM Rt.), the regional utility companies and the power plant companies, with funding through a World Bank loan to cover international procurement, aims to upgrade that system into a complex, intelligent and state-of-the-art process control system. The new hierarchical system will rely on a distributed computer network structure, universally accepted hardware/software interface standards and communication protocols and use hardware platform independent software. The automatic generation control, performed from the National Dispatch Centre, will have expanded functionality, the most important single item of this will be the inclusion of automatic voltage/var control. The upgrading project includes the replacement of the substation and power plant remote terminal units and the installation of a telecommunication network to provide this telecontrol system with the necessary communications links. The supply contracts for both the master station and the remote terminal unit parts were awarded to the winners of open international bidding processes. In the project implementation MVM has the overall responsibility and works with assistance from international and Hungarian engineering firms.

  9. OVERVIEW OF A RECONFIGURABLE SIMULATOR FOR MAIN CONTROL ROOM UPGRADES IN NUCLEAR POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    Ronald L. Boring

    2012-10-01

    This paper provides background on a reconfigurable control room simulator for nuclear power plants. The main control rooms in current nuclear power plants feature analog technology that is growing obsolete. The need to upgrade control rooms serves the practical need of maintainability as well as the opportunity to implement newer digital technologies with added functionality. There currently exists no dedicated research simulator for use in human factors design and evaluation activities for nuclear power plant modernization in the U.S. The new research simulator discussed in this paper provides a test bed in which operator performance on new control room concepts can be benchmarked against existing control rooms and in which new technologies can be validated for safety and usability prior to deployment.

  10. HOW ECOLOGICAL ENGINEERING HELPED TO CONTINUE BUILDING AND UPGRADE OF THE OPOLE POWER PLANT

    Directory of Open Access Journals (Sweden)

    Jan Siuta

    2016-09-01

    Full Text Available Principles of ecological engineering were applied for upgrading the Opole Power Plant under construction, complete with modern installation to protect the environment. The modernized project was a subject of „Integrated environmental impact assessment of the Opole Power Plant” developed by the Institute of Environmental Protection in 1981. The main issues covered by the impact assessment were presented and discussed at the national scientific conference attended, among others, by the representatives of local community from Opole. The conference was organized by the Polish Society of Ecological Engineering on June 5 and 6, 1992. The main aim of the conference was to identify and deliver as broad as possible analysis of environmental conditions for designing, building and operating coal fired power plants. A secondary goal, though of main concern for the Opole agglomeration, was to evaluate many-sided environmental risks resulting from the construction and operation of the Power Plant. The feasibility of continuing the construction of a power generating facility that meets the requirements of the 21st century was demonstrated by the fact that the Opole Power Plant S.A. was awarded the ISO 14001 - Environmental Management System certificate by the British Standards Institution. Advanced construction of the two consecutive blocks of a combined power of 1800 MW in the Opole Power Plant substantiates the validity and effectiveness of the conference organized in 1992.

  11. New drive converter and digital control for the pulsed power supply system of ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Käsemann, Claus-Peter, E-mail: c.p.kaesemann@ipp.mpg.de [Max Planck Institute for Plasma Physics, Boltzmannstraße 2, 85748 Garching (Germany); Jacob, Christian; Nguyen, Hong Ha; Stobbe, Ferdinand; Mayer, Alois [Max Planck Institute for Plasma Physics, Boltzmannstraße 2, 85748 Garching (Germany); Sachs, Edgar; Klein, Reiner [Siemens AG, Industrial Automation Systems, Gleiwitzer Straße 555, 90475 Nürnberg (Germany)

    2015-10-15

    Highlights: • IGBT converter system with integrated control. • Proven technology reduces time and budget. • Flexibility to be integrated into a 35 years old installation. • Stable control algorithms for static and dynamic speed control. • Possibilities for active and reactive power management. - Abstract: Safety and reliability are major issues for the ASDEX Upgrade (AUG) pulsed power supply systems. To avoid long downtimes during an experimental campaign, fault-prone components have to be identified and treated early. This becomes even more important due to the AUG participation in the EUROfusion Medium Sized Tokamak (MST) program. Operating equipment which is up to 40 years old adds additional complications. This contribution describes one such example where a 35 year old flywheel generator at AUG was identified as fault-prone and pre-emptively upgraded with a new drive converter with integrated control. Most challenging was to adapt a modern converter, originally designed for wind turbines, toward a drive system for a flywheel-motor-generator system. To identify the layout of the controller and the control parameters, accurate modeling and comprehensive simulations were performed. This effort paid off during commissioning and measuring results verified the calculated design values. Finally, the system shows good performance during AUG plasma experiments.

  12. Reactive Power Support of Electrical Vehicle Charging Station Upgraded with Flywheel Energy Storage System

    DEFF Research Database (Denmark)

    SUN, BO; Dragicevic, Tomislav; Savaghebi, Mehdi

    2015-01-01

    the operation of each component in the system. As a result, the charging station could supply the reactive power support to the utility grid without compromising the charging algorithm and preserve the battery’s lifetime. Finally, the real-time simulation results based on dSPACE1006 verifies the proposed......Electrical vehicles (EVs) are presenting increasingly potential to replace the conventional fossil fuel based vehicles due to environmental friendly characteristic. Accordingly, Charging Stations (CS), as an intermediate between grid and large numbers of EVs, are supposed to have more critical...... influence on future smart transportation network. This paper explores an off-board charging station upgraded with flywheel energy storage system that could provide a reactive power support to the grid utility. A supervisory control scheme based on distributed bus signaling is proposed to coordinate...

  13. 50 ns Backup Solution

    CERN Document Server

    Kain, V; Bartosik, H; Goddard, B; Höfle, W; Iadarola, G; Meddahi, M; Pieloni, T; Rumolo, G; Salvant, B; Wenninger, J

    2014-01-01

    The baseline bunch spacing for LHC high luminosity proton-proton operation after LS3 is 25 ns to maximize the integrated luminosity while keeping the pile-up low. The success of this mode of operation is not guaranteed. Electron cloud, UFOs, long-range beambeam, heating and other effects might make 25 ns operation in the LHC and/or the injectors difficult. This talk will review possible showstoppers in the LHC and injectors for 25 ns operation and discuss possible remedies. An alternative would be re-considering 50 ns operation. An estimate of the 50 ns performance will be given. The question of whether a different upgrade path would have to be chosen in case of 50 ns operation will also be addressed.

  14. A DC-DC conversion powering scheme for the CMS Phase-1 pixel upgrade

    Science.gov (United States)

    Feld, L.; Fleck, M.; Friedrichs, M.; Hensch, R.; Karpinski, W.; Klein, K.; Sammet, J.; Wlochal, M.

    2013-02-01

    The CMS pixel detector was designed for a nominal instantaneous LHC luminosity of 1ṡ1034 cm-2s-1. During Phase-1 of the LHC upgrade, the instantaneous luminosity will be increased to about twice this value. To preserve the excellent performance of the pixel detector despite the increase in particle rates and track densities, the CMS Collaboration foresees the exchange of its pixel detector in the shutdown 2016/2017. The new pixel detector will be improved in many respects, and will comprise twice the number of readout channels. A powering scheme based on DC-DC conversion will be adopted, which will enable the provision of the required power with the present cable plant. The powering scheme of the CMS pixel detector will be described, and the performance of prototype DC-DC buck converters will be presented, including power efficiency, system tests with DC-DC converters and pixel modules, thermal management, reliability at low temperature, and studies of potential frequency locking between DC-DC converters.

  15. Lithium Battery Management System Used in Back-up Power Supply of Coal Mine Monitoring System%煤矿井下监控系统后备电源用锂电池管理系统

    Institute of Scientific and Technical Information of China (English)

    何明刚; 李长录; 杨晓丹; 金树军

    2012-01-01

    In order to maintain the back-up power performance and prolong the service life of the battery,the back-up battery needs a management system.The system can detect every single cell in series of the battery,and accurately estimate SOC of the battery through the collection of real-time data from all single cells,and it can take a series of protective measures and display function in the battery charging and discharging process.%为了保持后备电源的性能和延长蓄电池的使用寿命,后备蓄电池需要有管理系统,探讨的锂电池管理系统能够检测串联电池组中的每个单体电池,通过采集到的所有单体电池实时数据,精确估算电池的荷电状态,并能够在电池充放电过程中采取一系列保护措施及显示的功能。

  16. Efficiency improvement of power-to-gas technology by biogas upgrading; Effizienzsteigerung von Power-to-Gas-Technologie durch Biogasaufbereitung

    Energy Technology Data Exchange (ETDEWEB)

    Wuensche, Karsten [MT-BioMethan GmbH, Zeven (Germany)

    2013-08-15

    As a result of the accelerated turnaround in energy policy and Germany's complete nuclear phase-out by the end of 2022 there is a need for a radical transformation of the energy supply. In the conflicting areas of renewable energies expansion, network infrastructure with limited feed-in capacity, focussed centres of energy generation and fluctuations in demand, the discussion around implementation is controversial. A promising solution is the power-to-gas concept with which surplus electricity from wind energy can be transformed into synthetic natural gas. The combination of this process with biogas technology offers great potential for efficiency improvement. The upgrading of raw biogas to biomethane by pressureless amine scrubbing involves relevant synergy effects that can be exploited in terms of heat and carbon dioxide. (orig.)

  17. High power ECRH and ECCD in moderately collisional ASDEX Upgrade Hmodes and status of EC system upgrade

    Directory of Open Access Journals (Sweden)

    Stober J.

    2015-01-01

    Full Text Available This contribution deals with H-modes with significant heat exchange between electrons and ions, but which can still show large differences between electron and ion-temperatures especially inside half minor radius. These conditions are referred to as moderately collisional. A systematic study shows that an increasing fraction of electron heating increases the transport in the ion channel mainly due to the dependence of the ITG dominated ion transport on the ratio Te/Ti in agreement with modeling. The rotational shear in the plasmas under study was so small that it hardly influences ITG stability, such that variations of the rotation profile due to a change of the heating method were of minor importance. These findings connect to studies of advanced tokamak scenarios using ECCD as a tool to modify the q-profile. The electron heating connected to the ECCD tends to increase the transport in the ion channel quite in contrast to the goal to operate at reduced current but with increased confinement. The confinement only increases as the fraction of ion heating is increased by adding more NBI. An ITER case was modeled as well. Due to the larger value of νei ・ τE the ratio Te/Ti is only moderately reduced even with strong electron heating and the confinement reduction is small even for the hypothetic case of using only ECRH as additional heating. Finally the paper discusses the ongoing upgrade of the AUG ECRH-system.

  18. Ion cyclotron resonance heating systems upgrade toward high power and CW operations in WEST

    Energy Technology Data Exchange (ETDEWEB)

    Hillairet, Julien, E-mail: julien.hillairet@cea.fr; Mollard, Patrick; Bernard, Jean-Michel; Argouarch, Arnaud; Berger-By, Gilles; Charabot, Nicolas; Colas, Laurent; Delaplanche, Jean-Marc; Ekedahl, Annika; Fedorczak, Nicolas; Ferlay, Fabien; Goniche, Marc; Hatchressian, Jean-Claude; Helou, Walid; Jacquot, Jonathan; Joffrin, Emmanuel; Litaudon, Xavier; Lombard, Gilles; Magne, Roland; Patterlini, Jean-Claude [CEA, IRFM, F-13108 Saint Paul-lez-Durance (France); and others

    2015-12-10

    The design of the WEST (Tungsten-W Environment in Steady-state Tokamak) Ion cyclotron resonance heating antennas is based on a previously tested conjugate-T Resonant Double Loops prototype equipped with internal vacuum matching capacitors. The design and construction of three new WEST ICRH antennas are being carried out in close collaboration with ASIPP, within the framework of the Associated Laboratory in the fusion field between IRFM and ASIPP. The coupling performance to the plasma and the load-tolerance have been improved, while adding Continuous Wave operation capability by introducing water cooling in the entire antenna. On the generator side, the operation class of the high power tetrodes is changed from AB to B in order to allow high power operation (up to 3 MW per antenna) under higher VSWR (up to 2:1). Reliability of the generators is also improved by increasing the cavity breakdown voltage. The control and data acquisition system is also upgraded in order to resolve and react on fast events, such as ELMs. A new optical arc detection system comes in reinforcement of the V{sub r}/V{sub f} and SHAD systems.

  19. Mechanical braking system for the pulsed power supply system of ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Käsemann, C.-P., E-mail: c.p.kaesemann@ipp.mpg.de [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Huart, M. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Michel Huart Personal Coaching and Consulting, Georgenschwaigstraße 23 RG, 80807 München (Germany); Stobbe, F.; Goldstein, I.; Sigalov, A. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Sachs, E. [Siemens AG, Industrial Automation Systems, Gleiwitzer Straße 555, 90475 Nürnberg (Germany); Perk, E. [Piper Test and Measurement Ltd., The Barn, Bilsington, Ashford, Kent TN25 7JT, England (United Kingdom)

    2013-10-15

    Highlights: ► Compact and innovative solution for dumping of large kinetic energy. ► Small mass of energy converter at the shaft due to circulating storage medium. ► Design of the active parts ensures flat torque/power characteristics. ► Also suitable for spending a great part of operating life in “Freewheeling” mode. -- Abstract: A few years ago, IPP reviewed the safety of the ASDEX Upgrade pulsed power supply system. Two critical sub-systems had been identified: The (electrical) braking system for the flywheel generators and the oil lubrication system for the shaft bearings. A simultaneous failure of these two systems may lead to severe damages and could have consequences for the safety of operating personnel. Therefore a second, independent braking possibility for every generator was stipulated. Especially the challenges adapting a dynamometer, originally designed for motor test benches, towards a plant safety system for generator EZ4 will be described in the paper. Further on, the paper will present the problems, implementing such a system into an existing installation, including the calculation of the required supporting structure, balancing of the extended shaft line and required water cooling and control. Finally it will report on the performance achieved during operation.

  20. Ion cyclotron resonance heating systems upgrade toward high power and CW operations in WEST

    CERN Document Server

    Hillairet, Julien; Zhao, Yanping; Bernard, Jean-Michel; Song, Yuntao; Argouarch, Arnaud; Berger-By, Gilles; Charabot, Nicolas; Chen, Gen; Chen, Zhaoxi; Colas, Laurent; Delaplanche, Jean-Marc; Dumortier, Pierre; Durodié, Frédéric; Ekedahl, Annika; Fedorczak, Nicolas; Ferlay, Fabien; Goniche, Marc; Hatchressian, Jean-Claude; Helou, Walid; Jacquot, Jonathan; Joffrin, Emmanuel; Litaudon, Xavier; Lombard, Gilles; Maggiora, Riccardo; Magne, Roland; Milanesio, Daniele; Patterlini, Jean-Claude; Prou, Marc; Verger, Jean-Marc; Volpe, Robert; Vulliez, Karl; Wang, Yongsheng; Winkler, Konstantin; Yang, Qingxi; Yuan, Shuai

    2016-01-01

    The design of the WEST (Tungsten-W Environment in Steady-state Tokamak) Ion cyclotron resonance heating antennas is based on a previously tested conjugate-T Resonant Double Loops prototype equipped with internal vacuum matching capacitors. The design and construction of three new WEST ICRH antennas are being carried out in close collaboration with ASIPP, within the framework of the Associated Laboratory in the fusion field between IRFM and ASIPP. The coupling performance to the plasma and the load-tolerance have been improved, while adding Continuous Wave operation capability by introducing water cooling in the entire antenna. On the generator side, the operation class of the high power tetrodes is changed from AB to B in order to allow high power operation (up to 3 MW per antenna) under higher VSWR (up to 2:1). Reliability of the generators is also improved by increasing the cavity breakdown voltage. The control and data acquisition system is also upgraded in order to resolve and react on fast events, such a...

  1. Feasibility study of the University of Utah TRIGA reactor power upgrade in respect to control rod system

    Science.gov (United States)

    Cutic, Avdo

    The objectives of this thesis are twofold: to determine the highest achievable power levels of the current University of Utah TRIG Reactor (UUTR) core configuration with the existing three control rods, and to design the core for higher reactor power by optimizing the control rod worth. For the current core configuration, the maximum reactor power, eigenvalue keff, shutdown margin, and excess reactivity have been measured and calculated. These calculated estimates resulted from thermal power calibrations, and the control rod worth measurements at various power levels. The results were then used as a benchmark to verify the MCNP5 core simulations for the current core and then to design a core for higher reactor power. This study showed that the maximum achievable power with the current core configuration and control rod system is 150kW, which is 50kW higher than the licensed power of the UUTR. The maximum achievable UUTR core power with the existing fuel is determined by optimizing the core configuration and control rod worth, showing that a power upgrade of 500 kW is achievable. However, it requires a new control rod system consisting of a total of four control rods. The cost of such an upgrade is $115,000.

  2. RF Power Detector/Monitor Upgrade for the 500MHz Systems at the ALS

    Energy Technology Data Exchange (ETDEWEB)

    Baptiste, K.

    2003-05-08

    Several systems rely on the accurate and linear detection of 500 MHz signals, (the fundamental frequency of both the Booster Ring and Storage Ring) over a dynamic range in excess of 25dB. Prior to this upgrade, the detector/monitor was diode based and though this type of detector could handle the dynamic range requirement it could not do so in an accurate and linear manner. In order to meet the requirements (dynamic range greater than or equal to 25dB, accurate and linear to +-0.25dB over the range, and additional circuitry to interface to the legacy control system and interlocks), a new RF Power Detector/Monitor has been developed using two AD8361, Analog Devices Tru RMS Detectors and a fuzzy comparator, which extends the overall detector's range to twice that of the AD8361. Further information is available [www.analogedevices.com/]. Details of the design requirements and the detector/monitor's circuit as well as the performance of the detector will be presented.

  3. Design on Lithium-ion Battery Backup Power System in Coal Mine Refuge Chamber%煤矿避难硐室锂离子蓄电池后备电源系统设计

    Institute of Scientific and Technical Information of China (English)

    肖林京; 常龙; 张瑞雪; 岳明臣; 公栋梁

    2014-01-01

    In order to meet special requirements of backup power in coal mine refuge chamber,firstly serial lithium-ion batteries were put in an explosion protection box with their battery management system.Then parallel explosion protection boxes formed the backup power system.The system included voltage detection and balance controller,battery pack module controller,assembly controller,LCD controller.It collected voltage and temperature data by distribution voltage sampling method and DS18B20 temperature sensor. It collected current data by current hall sensors.Then system took steps to prevent over voltage,over temperature,over current etc.Through field test verification, system operation was steady,measuring error of current and voltage were far less than the specified value of coal mine safety standards.%为满足煤矿避难硐室锂后备电源系统的特殊要求,将多个单体锂离子蓄电池串联成组,配套管理系统放入隔爆箱内构成电池组模块,再把多个电池组模块并联使用构成煤矿避难硐室锂离子蓄电池后备电源系统。管理系统按照功能分为单体电压检测均衡控制器、电池组模块控制器、总成控制器、液晶显示控制器。系统应用分布电压采集法和DS18B20温度传感器采集单体电池电压、温度数据,应用电流霍尔传感器采集电池组电流数据,再根据这些数据对电源系统进行过压、过温、过流等保护。通过现场试验验证,系统运行稳定,电流和电压测量误差远小于煤矿安全标准的规定值。

  4. Upgrade of a 30 kV/10 mA anode power supply for triode type gyrotron

    Energy Technology Data Exchange (ETDEWEB)

    Siravo, Ugo, E-mail: ugo.siravo@epfl.ch; Alberti, Stefano; Dubray, Jérémie; Fasel, Damien; Hogge, Jean-Philippe; Marlétaz, Blaise; Marmillod, Philippe; Perez, Albert; Silva, Miguel

    2015-10-15

    Highlights: • Triode type gyrotron is fed by 3 power supplies: the main, an anode PS(APS) and a heater. • This paper presents the upgrade of 3APS, supplied in 1999, that never fulfilled the specs. • The new working principle is very efficient, easy to implement, for a minimal cost. • Upgraded APS provides extended modulation capabilities, no overshoot and lowerripple. • This upgrade will allow exploring new operation regimes for the 3 TCV X3 gyrotrons. - The RF power of a gyrotron with a triode type magnetron-injection-gun (MIG) can be directly controlled via the voltage applied between its anode and its cathode. Hence, the performance of this type of gyrotron relies directly on the possibilities offered by the power supply controlling the anode to cathode voltage. For a system of gyrotrons connected to the same main high-voltage power supply, with a triode MIG one has the additional advantage of independently controlling each individual gyrotron. This paper presents the modifications brought to the three existing 30 kV/10 mA anode power supplies connected to the 500 kW/118 GHz/2s X3 gyrotrons operated on the TCV Tokamak. The new working principle based on phase-shift modulation (PSM) is described in detail. Experimental results obtained on dummy load are compared to simulations performed during the design phase. With respect to the initial working principle, the modulation frequency capability has been increased by a factor 10 reaching more than 5 kHz, whereas the output voltage ripple as well as the overshoot/undershoot have been significantly reduced.

  5. Status of the Ultracold neutron source upgrade at LANSCE [PowerPoint

    Energy Technology Data Exchange (ETDEWEB)

    Pattie Jr., Robert Wayne [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-10-31

    Several slides show the source and flux of ultracold neutrons produced. In summary, an upgraded UCN source has been designed, and parts are currently being fabricated. Nickel phosphorus-coated guides will improve transport to the experiment hall. The source will be installed in the spring of 2016 and commissioned in the fall of 2016.

  6. Take control of easy Mac backups

    CERN Document Server

    Kissell, Joe

    2011-01-01

    Joe walks you through these important steps: Identifying backup hardware that matches your needs and budgetUnderstanding the pros and cons of Time Machine, including nine situations where you'll want to go beyond Time MachineSetting up your backup drive (or Time Capsule)Configuring Time MachineMaking a bootable duplicateStoring a backup offsiteRecovering your data You'll also get tips for setting up ChronoSync, CrashPlan, Data Backup, QRecall, Retrospect, and Synk; find out how an online sync is (and isn't) like a backup; and find coupons for 10% off CrashPlan and a 30 discount on Data Backup

  7. An Upgraded Front-End Switching Power Supply Design For the ATLAS TileCAL Detector of the LHC

    CERN Document Server

    Drake, Gary; The ATLAS collaboration

    2011-01-01

    We present the design of an upgraded switching power supply brick for the front-end electronics of the ATLAS hadron tile calorimeter (TileCAL) at the LHC. The new design features significant improvement in noise, improved fault detection, and generally a more robust design, while retaining the compact size, water-cooling, output control, and monitoring features in this 300 KHz design. We discuss the improvements to the design, and the radiation testing that we have done to qualify the design. We also present our plans for the production of 2400 new bricks for installation on the detector in 2013.

  8. Construction and Application of Network Equipment Emergency Backup System in Power Supply System%网络设备应急与备份系统在供电系统中的建设与应用

    Institute of Scientific and Technical Information of China (English)

    徐擒彪; 文涛

    2014-01-01

    With the rapid development of computer industry , information technology has gradually gained popularity in many industries .Power industry as the support industry of national economic development , the stability of its information network is very important , and the information equipment system is the key to the stability of information network .How to manage and maintain the current network more reasonably and effectively , and how to make the network managers can more easily manage and maintain the network , be-come a brook no delay problem .This article begins from the network operation and maintenance manage-ment of Xuancheng Power Supply Company , discusses the existing problems of the current network manage -ment system of Xuancheng Power Supply Company , through the deployment of network equipment emergen-cy backup system to strengthen the network management system , to guarantee the network infrastructure of Xuancheng Power Supply Company , to build a safe and reliable electric power information network .%随着计算机产业的迅猛发展,信息化逐渐在各行业得到普及,电力行业作为国民经济发展的支撑行业,信息网络的稳定性非常重要,而信息设备体系是信息网络稳定性的关键。如何更加合理、有效地对当前的网络进行管理和维护以及怎样让网管人员能够更加轻松地对网络进行管理和维护,成为一个亟待研究的问题。文章从宣城供电公司当前网络运维管理着手,探讨宣城供电公司现有网络管理系统存在的问题,通过部署网络设备应急与备份系统来加强宣城供电公司的网络管理体系,保障宣城供电公司的基础网络架构,以便构建一个安全可靠的电力信息网络。

  9. ITK optical links backup document

    CERN Document Server

    Huffman, B T; The ATLAS collaboration; Flick, T; Ye, J

    2013-01-01

    This document describes the proposed optical links to be used for the ITK in the phase II upgrade. The current R&D for optical links pursued in the Versatile Link group is reviewed. In particular the results demonstrating the radiation tolerance of all the on-detector components are documented. The bandwidth requirements and the resulting numerology are given.

  10. A new slip stacking RF system for a twofold power upgrade of Fermilab's Accelerator Complex

    Energy Technology Data Exchange (ETDEWEB)

    Madrak, Robyn

    2014-09-11

    Fermilab@?s Accelerator Complex has been recently upgraded, in order to increase the 120GeV proton beam power on target from about 400kW to over 700kW for NO@nA and other future intensity frontier experiments. One of the key ingredients of the upgrade is the offloading of some Main Injector synchrotron operations - beam injection and RF manipulation called ''slip stacking'' - to the 8GeV Recycler Ring, which had until recently been used only for low-intensity antiproton storage and cooling. This required construction of two new 53MHz RF systems for the slip-stacking manipulations. The cavities operate simultaneously at V_p_e_a_k@?150kV, but at slightly different frequencies (@Df=1260Hz). Their installation was completed in September 2013. This paper describes the novel solutions used in the design of the new cavities, their tuning system, and the associated high power RF system. First results showing effective operation of the RF system, beam capture and successful slip-stacking in the Recycler Ring are presented.

  11. A new slip stacking RF system for a twofold power upgrade of Fermilab's Accelerator Complex

    Energy Technology Data Exchange (ETDEWEB)

    Madrak, Robyn [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2014-05-15

    Fermilab's Accelerator Complex has been recently upgraded, in order to increase the 120 GeV proton beam power on target from about 400 kW to over 700 kW for NOvA and other future intensity frontier experiments. One of the key ingredients of the upgrade is the offloading of some Main Injector synchrotron operations - beam injection and RF manipulation called ''slip stacking'' - to the 8GeV Recycler Ring, which had until recently been used only for low-intensity antiproton storage and cooling. This required construction of two new 53 MHz RF systems for the slip-stacking manipulations. The cavities operate simultaneously at Vpeak ≲150 kV, but at slightly different frequencies (Δf=1260 Hz). Their installation was completed in September 2013. This article describes the novel solutions used in the design of the new cavities, their tuning system, and the associated high power RF system. First results showing effective operation of the RF system, beam capture and successful slip-stacking in the Recycler Ring are presented.

  12. Seismic assessment and upgrading of nuclear power plants in Eastern Europe

    Energy Technology Data Exchange (ETDEWEB)

    Katona, T.; Kostov, M.

    1997-03-01

    The basic findings of the seismic re-qualification programmes going on recently at all VVER plants in Eastern Europe can be summarised. The problems of the seismic safety have to be solved taking into account the general concept of the nuclear safety enhancement of the units. There are cases where the system improvements lead to better and more effective solution of the problem than the structural upgrading. The equipment and piping of the primary system have sufficient capacity. The viscous dampers are considered usually for the upgrading. The equipment anchorage especially the electrical and I and C equipment anchorage have to be upgraded. There are general consideration for replacement of the hydraulic snubbers by viscous dampers in the primary circuit of the VVER 440/V230. The considerations are not only because of the better seismic behaviour but mainly because of the better operational performance. There is relatively good seismic instrumentation at the plants considered. The definition of the scram level of the units not designed for an OBE is an essential problem. More effort needed for the definition of this level on the basis of re-evaluation experience of the plant equipment and after the proper definition of post-earthquake activities. The seismic re-evaluation and re-qualification of the VVER units is a general safety issue in Easter European countries. This rather complex problem can be solved adopting the experience, methods and requirements of western countries and taking into account the design features of the VVER units as well as the as built and as it is conditions. (J.P.N.)

  13. A fast, low-power, 6-bit SAR ADC for readout of strip detectors in the LHCb Upgrade experiment.

    CERN Document Server

    Firlej, M; Idzik, M; Moron, J; Swientek, K

    2014-01-01

    The readout of silicon strip sensors in the upgraded Tracker System of Large Hadron Collider beauty (LHCb) experiment will require a novel complex Application Specific Integrated Circuit (ASIC). The ASIC will extract and digitise analogue signal from the sensor and subsequently will perform digital processing and serial data transmission. One of the key processing blocks, placed in each channel, will be an Analogue to Digital Converter (ADC). A prototype of fast, low-power 6-bit Successive Approximation Register (SAR) ADC was designed, fabricated and tested. The measurements of ADC prototypes confirmed simulation results showing excellent overall performance. In particular, very good resolution with Effective Number Of Bits (ENOB) 5.85 was obtained together with very low power consumption of 0.35 mW at 40 MS/s sampling rate. The results of the performed static and dynamic measurements confirm excellent ADC operation for higher sampling rates up to 80 MS/s.

  14. A fast, low-power, 6-bit SAR ADC for readout of strip detectors in the LHCb Upgrade experiment

    Science.gov (United States)

    Firlej, M.; Fiutowski, T.; Idzik, M.; Moron, J.; Swientek, K.

    2014-07-01

    The readout of silicon strip sensors in the upgraded Tracker System of Large Hadron Collider beauty (LHCb) experiment will require a novel complex Application Specific Integrated Circuit (ASIC). The ASIC will extract and digitise analogue signal from the sensor and subsequently will perform digital processing and serial data transmission. One of the key processing blocks, placed in each channel, will be an Analogue to Digital Converter (ADC). A prototype of fast, low-power 6-bit Successive Approximation Register (SAR) ADC was designed, fabricated and tested. The measurements of ADC prototypes confirmed simulation results showing excellent overall performance. In particular, very good resolution with Effective Number Of Bits (ENOB) 5.85 was obtained together with very low power consumption of 0.35 mW at 40 MS/s sampling rate. The results of the performed static and dynamic measurements confirm excellent ADC operation for higher sampling rates up to 80 MS/s.

  15. Making ICRF power compatible with a high-Z wall in ASDEX Upgrade

    Science.gov (United States)

    Bobkov, V.; Aguiam, D.; Bilato, R.; Brezinsek, S.; Colas, L.; Faugel, H.; Fünfgelder, H.; Herrmann, A.; Jacquot, J.; Kallenbach, A.; Milanesio, D.; Maggiora, R.; Neu, R.; Noterdaeme, J.-M.; Ochoukov, R.; Potzel, S.; Pütterich, T.; Silva, A.; Tierens, W.; Tuccilo, A.; Tudisco, O.; Wang, Y.; Yang, Q.; Zhang, W.; ASDEX Upgrade Team; the EUROfusion MST1 Team

    2017-01-01

    A comparison of the ASDEX Upgrade 3-strap ICRF antenna data with the linear electro-magnetic TOPICA calculations is presented. The comparison substantiates a reduction of the local electric field at the radially protruding plasma-facing elements of the antenna as a relevant approach for minimizing tungsten (W) sputtering in conditions when the slow wave is strongly evanescent. The measured reaction of the time-averaged RF current at the antenna limiters to the antenna feeding variations is less sensitive than predicted by the calculations. This is likely to have been caused by temporal and spatial fluctuations in the 3D plasma density distribution affected by local non-linear interactions. The 3-strap antenna with the W-coated limiters produces drastically less W sputtering compared to the W-coated 2-strap antennas. This is consistent with the non-linear asymptotic SSWICH-SW calculations for RF sheaths.

  16. RF power upgrade at the superconducting 1.3 GHz CW LINAC “ELBE” with solid state amplifiers

    Energy Technology Data Exchange (ETDEWEB)

    Büttig, Hartmut, E-mail: buettig@hzdr.de [Radiation Source ELBE, Helmholtz Zentrum Dresden-Rossendorf (Germany); Arnold, A.; Büchner, A.; Justus, M.; Kuntsch, M.; Lehnert, U.; Michel, P.; Schurig, R.; Staats, G.; Teichert, J. [Radiation Source ELBE, Helmholtz Zentrum Dresden-Rossendorf (Germany)

    2013-03-11

    The RF power for the superconducting 1.3 GHz CW LINAC “ELBE” has been doubled from less than 10 kW to 20 kW per cavity. In January 2012 the four 10 kW klystrons used to drive the four superconducting cavities of the LINAC have been replaced by pairs of 10 kW solid state power amplifiers (SSPA). ELBE is now worldwide the first 1.3 GHz CW LINAC equipped with solid state RF power amplifiers. This technical note details on this project. -- Highlights: ► We report the first installation of 10 kW solid state RF-amplifiers at 1.3 GHz CW LINAC. ► The sc. cavities of “ELBE” are now driven by a pair of 10 kW solid state amplifiers (SSPA). ► The RF-power upgrade allows doubling the electron beam current (CW). ► Advantages of the new RF system are high reliability, easy service and lower costs.

  17. Upgrade of the MAGIC telescopes single wavelength micro power LIDAR system

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Dominik [Max-Planck-Institut fuer Physik, Muenchen (Germany); Collaboration: MAGIC-Collaboration

    2016-07-01

    Since 2011 a single wavelength LIDAR system is operated alongside the observations of the MAGIC telescopes. It is used for real-time monitoring of the atmospheric transmission and for detecting cloud layers within the field of view of MAGIC. The system uses a pulsed Nd:YAG laser with 532 nm wavelength and a pulse energy of 5 μJ as transmitter. The receiver is mounted to a 60 cm spherical single mirror telescope with a F/D ratio of 2.5. To compensate for the low light intensities a sensitive detector with the capability of single photon detection as well as charge integration is needed. For this purpose, a hybrid photo diode with a peak quantum efficiency of 55% an a pulse width of 2.5ns is used in a custom designed detector. The analog signal is recorded by a computer mounted 8-bit FADC with 200 MS/s. A signal analysis algorithm converts the LIDAR return signal into a number of single photoelectron counts per range bin. The atmospheric transmission is calculated by fitting a Rayleigh back-scattering model with a sliding window. The resulting transmission profile is used to correct the MAGIC gamma ray data for adverse weather conditions. After five years of data taking the MAGIC LIDAR system is upgraded with a stronger laser and a new detector unit in order to extend the measurement range and to optimize the operation.

  18. A DC-DC Conversion Powering Scheme for the CMS Phase-1 Pixel Upgrade

    CERN Document Server

    Feld, Lutz Werner; Marcel Friedrichs; Richard Hensch; Karpinski, Waclaw; Klein, Katja; Sammet, Jan Domenik; Wlochal, Michael

    2012-01-01

    The powering scheme of the CMS pixel detector will be described, and the performance of prototype DC-DC buck converters will be presented, including power efficiency, system tests with DC-DC converters and pixel modules, thermal management, reliability at low temperature, and studies of potential frequency locking betwe...

  19. The DC-DC Conversion Power System of the CMS Phase-1 Pixel Upgrade

    CERN Document Server

    Klein, Katja

    2014-01-01

    The power system of the Phase-1 pixel detector will be described and the performance of the new components, including DC-DC converters, DC-DC converter motherboards and various power distribution boards, will be detailed. The outcome of system tests in terms of electrical behaviour, thermal management and pixel module performance will be discussed.

  20. Social Backup and Sharing of Video using HTTP Adaptive Streaming

    NARCIS (Netherlands)

    Stokking, H.M.; Klos, V.B.; Jiang, J.; Casetti, C.

    2013-01-01

    This paper is on social backup, sharing and remote access of video using HTTP Adaptive Streaming. A social backup is a backup at the location, and thus on the equipment, of (close) friends and family. Backups are created at friends’ locations, matching the hosting user’s interest with the content an

  1. Social Backup and Sharing of Video using HTTP Adaptive Streaming

    NARCIS (Netherlands)

    Stokking, H.M.; Klos, V.B.; Jiang, J.; Casetti, C.

    2013-01-01

    This paper is on social backup, sharing and remote access of video using HTTP Adaptive Streaming. A social backup is a backup at the location, and thus on the equipment, of (close) friends and family. Backups are created at friends’ locations, matching the hosting user’s interest with the content

  2. Development of a DC-DC conversion powering scheme for the CMS Phase-1 pixel upgrade

    Science.gov (United States)

    Feld, L.; Fimmers, C.; Karpinski, W.; Klein, K.; Lipinski, M.; Preuten, M.; Rauch, M.; Rittich, D.; Sammet, J.; Wlochal, M.

    2014-01-01

    A novel powering scheme based on the DC-DC conversion technique will be exploited to power the CMS Phase-1 pixel detector. DC-DC buck converters for the CMS pixel project have been developed, based on the AMIS5 ASIC designed by CERN. The powering system of the Phase-1 pixel detector is described and the performance of the converter prototypes is detailed, including power efficiency, stability of the output voltage, shielding, and thermal management. Results from a test of the magnetic field tolerance of the DC-DC converters are reported. System tests with pixel modules using many components of the future pixel barrel system are summarized. Finally first impressions from a pre-series of 200 DC-DC converters are presented.

  3. Development of a DC-DC conversion powering scheme for the CMS Phase-1 pixel upgrade

    CERN Document Server

    Feld, Lutz Werner; Karpinski, Waclaw; Klein, Katja; Lipinski, Martin; Preuten, Marius; Max Rauch; Rittich, David Michael; Sammet, Jan Domenik; Wlochal, Michael

    2014-01-01

    A novel powering scheme based on the DC-DC conversion technique will be exploited to power the CMS Phase-1 pixel detector. DC-DC buck converters for the CMS pixel project have been developed, based on the AMIS5 ASIC designed by CERN. The powering system of the Phase-1 pixel detector is described and the performance of the converter prototypes is detailed, including power efficiency, stability of the output voltage, shielding, and thermal management. Results from a test of the magnetic field tolerance of the DC-DC converters are reported. System tests with pixel modules using many components of the future pixel barrel system are summarized. Finally first impressions from a pre-series of 200 DC-DC converters are presented.

  4. On the asymmetries of ELM divertor power deposition in JET and ASDEX Upgrade

    DEFF Research Database (Denmark)

    Eich, T.; Kallenbach, A.; Fundamenski, W.

    2009-01-01

    . The paper discusses a comparable simple extension of the model by introducing a non-zero characteristic velocity of the Maxwellian distributed particles. This way the experimentally observed temporal evolution as well as the in/out energy imbalance can be described. The extended model named free......An analytical expression was derived for describing the divertor target power during ELMs based on the model discussed in [W. Fundamenski, R.A. Pitts, Plasma Phys. Control. Fus. 48 (2006) 109] where the power load arises from a Maxwellian distribution of particles released into the SOL region...

  5. Redundancy Management for P2P Backup

    CERN Document Server

    Toka, Laszlo; Dell'Amico, Matteo; Michiardi, Pietro

    2012-01-01

    We design and analyze the performance of a redundancy management mechanism for Peer-to-Peer backup applications. Armed with the realization that a backup system has peculiar requirements -- namely, data is read over the network only during restore processes caused by data loss -- redundancy management targets data durability rather than attempting to make each piece of information availabile at any time. In our approach each peer determines, in an on-line manner, an amount of redundancy sufficient to counter the effects of peer deaths, while preserving acceptable data restore times. Our experiments, based on trace-driven simulations, indicate that our mechanism can reduce the redundancy by a factor between two and three with respect to redundancy policies aiming for data availability. These results imply an according increase in storage capacity and decrease in time to complete backups, at the expense of longer times required to restore data. We believe this is a very reasonable price to pay, given the nature...

  6. Evaluation of the High Power Performance of the Upgraded NSTX HHFW Antenna

    Science.gov (United States)

    Ryan, P. M.; McLean, A.; Hosea, J. C.; Leblanc, B. P.; Perkins, R. J.; Taylor, G.; Wilson, J. R.; Pinsker, R. I.; the NSTX Team

    2011-10-01

    The end-grounded straps of the NSTX HHFW antenna array were replaced in 2009 with center-grounded straps to reduce the interior voltages and electric fields in the plasma/Faraday shield region. After accumulated lithium deposits were removed from the antenna surface by plasma conditioning, reliable HHFW power was increased to 3-4 MW from the 2-3 MW levels of 2008. However, in 2010 reliable operation was limited to less than 2 MW, primarily due to changes in the antenna environment associated with the Liquid Li Divertor. The antennas have been cleaned of Li coatings and Li2CO3 dust in preparation for the 2011 campaign. The HHFW system will be operated early in the campaign to minimize the effects of Li accumulation in ascertaining the efficacy of reducing internal fields to increase reliability. A visible light camera covering the complete array will observe Li ablation from the powered antenna, and a newly installed IR camera covering ~40% of the array will monitor localized hot spot formation. Work supported by USDOE Contract Nos. DE-AC05-00OR22725 and DE-AC02-09CH11466.

  7. EARLY-STAGE DESIGN AND EVALUATION FOR NUCLEAR POWER PLANT CONTROL ROOM UPGRADES

    Energy Technology Data Exchange (ETDEWEB)

    Ronald L. Boring; Jeffrey C. Joe; Thomas A. Ulrich; Roger T. Lew

    2015-03-01

    As control rooms are modernized with new digital systems at nuclear power plants, it is necessary to evaluate operator performance with these systems as part of a verification and validation process. While there is regulatory and industry guidance for some modernization activities, there are no well defined standard processes or predefined metrics available for assessing what is satisfactory operator interaction with new systems, especially during the early design stages. This paper proposes a framework defining the design process and metrics for evaluating human system interfaces as part of control room modernization. The process and metrics are generalizable to other applications and serve as a guiding template for utilities undertaking their own control room modernization activities.

  8. [Backup territorial coordination, nursing roles and skills].

    Science.gov (United States)

    Benyahia, Amina; Abraham, Éliane

    2016-06-01

    Backup territorial coordination provides accompaniment and support for professionals who work with the fragile elderly people in an area. It aligns the sanitary, medical-social and social approaches, and mobilizes useful resources to optimize the treatment pathway. It has been implemented in the Nancy urban area by an operational team including nurses and a geriatric physician.

  9. A novel powering scheme based on DC-DC conversion for the luminosity upgrades of the CMS tracking system at CERN

    Energy Technology Data Exchange (ETDEWEB)

    Sammet, Jan

    2014-03-18

    The instantaneous luminosity of the LHC is expected to reach 2 x 10{sup 34} s{sup -1}cm{sup -2} and 5 x 10{sup 34} s{sup -1}cm{sup -2} around the years 2019 and 2024, respectively. After the second upgrade the LHC will be referred to as the High Luminosity LHC (HL-LHC). In order to benefit from the higher luminosities, CMS foresees to upgrade its pixel detector during an extended winter shutdown of the LHC at the end of 2016 and the beginning of 2017. During a long shutdown of the LHC over the years 2022 and 2023, it is foreseen to install a completely new tracking system in CMS. Both upgrades are expected to result in the need to provide more electric current to the detector. However, power losses in cables already contribute 50% to the power consumption of the present tracker and rise with the current squared. Since no more space is available for cables, and thicker cables within the tracking volume spoil the material budget of the detector, new powering schemes are considered mandatory. CMS foresees the use of radiation tolerant DC-DC converters on the front-end to reduce power losses on cables. This thesis describes the new powering scheme of the CMS pixel detector and discusses the options with respect to a new strip tracker. A radiation and magnetic field tolerant DC-DC converter prototype, the PIXV8A, is introduced and the research that led to its development is summarised. The PIXV8A has been developed for the application in the pixel upgrade and is also a first approach for a DC-DC converter for the later upgrade of the CMS tracking system. The PIXV8A makes use of the AMIS4 chip, which has been proven to stay operational for total ionising doses of up to 1 MGy and fluences of up to 10{sup 15} n{sub eq}/cm{sup 2}. With an input voltage of 10 V, the PIXV8A converter provides an efficiency of about 80% for output voltages of 2.5 V and 3.0 V. Within this thesis the robustness of the novel powering scheme and the qualification of the PIXV8A are demonstrated in

  10. 10kV农村电网改造升级规划设计%10 kV upgrade rural power grid planning and design

    Institute of Scientific and Technical Information of China (English)

    2015-01-01

    10kV电网可以直接为用户输送电能,在电力系统中占有重要地位,它的运行状况也会直接影响到人们的生活。原有的供电系统已经不能满足人们的需求,所以国家对农村电网进行了投资,实行电网的改造升级计划。%10 kV power grid can be directly for the user transmission power, occupies an important position in the power system, its performance will directly affect people's life. The original power supply system already can't satisfy people's needs, so the state of rural power grid investment, implement grid upgrade plan.

  11. Reflective memory recorder upgrade: an opportunity to benchmark PowerPC and Intel architectures for real time

    Science.gov (United States)

    Abuter, Roberto; Tischer, Helmut; Frahm, Robert

    2014-07-01

    quantitative comparison between the two implementations (PowerPC14 and Intel Multicore20, 15) under different workloads will be presented. In particular, the interrupt handling, the reflective memory access, DMA readout, and TCP stack performances will be compared. To test the limits of the new hardware, the separation, on the different cores, of each of the basic tasks, as the readout, the network transfer, etc, were implemented and throughput reevaluated. The result shows that the RMN recorder1 can extend its operational range from 10 KHz to above 16 KHz by moving from a PowerPC14 to Intel Multicore20, 15. In general, a reduction of latencies and computational delays of could be expected by upgrading applications to Intel Multicore20, 15 architectures.

  12. Onsite and Electric Backup Capabilities at Critical Infrastructure Facilities in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, Julia A. [Argonne National Lab. (ANL), Argonne, IL (United States); Wallace, Kelly E. [Argonne National Lab. (ANL), Argonne, IL (United States); Kudo, Terence Y. [Argonne National Lab. (ANL), Argonne, IL (United States); Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-04-01

    The following analysis, conducted by Argonne National Laboratory’s (Argonne’s) Risk and Infrastructure Science Center (RISC), details an analysis of electric power backup of national critical infrastructure as captured through the Department of Homeland Security’s (DHS’s) Enhanced Critical Infrastructure Program (ECIP) Initiative. Between January 1, 2011, and September 2014, 3,174 ECIP facility surveys have been conducted. This study focused first on backup capabilities by infrastructure type and then expanded to infrastructure type by census region.

  13. Enterprise systems backup and recovery a corporate insurance policy

    CERN Document Server

    de Guise, Preston

    2008-01-01

    The success of information backup systems does not rest on IT administrators alone. Rather, a well-designed backup system comes about only when several key factors coalesce-business involvement, IT acceptance, best practice designs, enterprise software, and reliable hardware. Enterprise Systems Backup and Recovery: A Corporate Insurance Policy provides organizations with a comprehensive understanding of the principles and features involved in effective enterprise backups.Instead of focusing on any individual backup product, this book recommends corporate procedures and policies that need to be established for comprehensive data protection. It provides relevant information to any organization, regardless of which operating systems or applications are deployed, what backup system is in place, or what planning has been done for business continuity. It explains how backup must be included in every phase of system planning, development, operation, and maintenance. It also provides techniques for analyzing and impr...

  14. The role of IAEA in the seismic assessment and upgrading of existing NPPs. Seismic safety of nuclear power plants in Eastern Europe

    Energy Technology Data Exchange (ETDEWEB)

    Guerpinar, A.; Godoy, A. [International Atomic Energy Agency, Vienna (IAEA). Div. of Nuclear Installation Safety

    1997-03-01

    This paper summarizes the work performed by the International Atomic Energy Agency in the areas of safety reviews and applied research in support of programmes for the assessment and enhancement of seismic safety in Eastern Europe and in particular WWER type nuclear power plants during the past seven years. Three major topics are discussed; engineering safety review services in relation to external events, technical guidelines for the assessment and upgrading of WWER type nuclear power plants, and the Coordinated Research Programme on `Benchmark study for the seismic analysis and testing of WWER type nuclear power plants`. These topics are summarized in a way to provide an overview of the past and present safety situation in selected WWER type plants which are all located in Eastern European countries. Main conclusion of the paper is that although there is now a thorough understanding of the seismic safety issues in these operating nuclear power plants, the implementation of seismic upgrades to structures, systems and components are lagging behind, particularly for those cases in which the re-evaluation indicated the necessity to strengthen the safety related structures or install new safety systems. (author)

  15. HIRFL Operation and Upgrade

    Institute of Scientific and Technical Information of China (English)

    ZhaoHongwei; WangYifang; ZhanWenlong; WeiBaowen; HIRFLTeam

    2003-01-01

    After almost one year shutdown for upgrading the vacuum chamber of the iniector SFC,SFC has been in operation separately since May 2003. The SFC operation statistics and accelerated heams from May to December 2003 are shown in Table 1 and 2. The main cyclotron SSC has beenfor still shut down in 2003 for upgrading the SSC power supply system, control and diagnostic system, and themain experimental area, LECR3, an ECR ion source dedicated for atomic physics and surface physics research, has provided 2488 hours beams for experiments of atomic physics research.

  16. ATLAS ITk Short Strip Prototype Module with Integrated DCDC Powering and Control Phase II Upgrade of the ATLAS Inner Tracker detector at the HL - LHC

    CERN Document Server

    Greenall, Ashley; The ATLAS collaboration

    2017-01-01

    The prototype Barrel module design, for the Phase II upgrade of the of the new Inner Tracker (ITk) detector at the LHC, has adopted an integrated low mass assembly featuring single-sided flexible circuits, with readout ASICs, glued to the silicon strip sensor. Further integration has been achieved by the attachment of module DCDC powering, HV sensor biasing switch and autonomous monitoring and control to the sensor. This low mass, integrated module approach benefits further in a reduced width stave structure to which the modules are attached. The results of preliminary electrical tests of such an integrated module will be presented.

  17. Comparison of Cloud backup performance and costs in Oracle database

    Directory of Open Access Journals (Sweden)

    Aljaž Zrnec

    2011-06-01

    Full Text Available Normal 0 21 false false false SL X-NONE X-NONE Current practice of backing up data is based on using backup tapes and remote locations for storing data. Nowadays, with the advent of cloud computing a new concept of database backup emerges. The paper presents the possibility of making backup copies of data in the cloud. We are mainly focused on performance and economic issues of making backups in the cloud in comparison to traditional backups. We tested the performance and overall costs of making backup copies of data in Oracle database using Amazon S3 and EC2 cloud services. The costs estimation was performed on the basis of the prices published on Amazon S3 and Amazon EC2 sites.

  18. Feasibility study of the university of Utah TRIGA reactor power upgrade - part II: Thermohydraulics and heat transfer study in respect to cooling system requirements and design

    Directory of Open Access Journals (Sweden)

    Babitz Philip

    2013-01-01

    Full Text Available The thermodynamic conditions of the University of Utah's TRIGA Reactor were simulated using SolidWorks Flow Simulation, Ansys, Fluent and PARET-ANL. The models are developed for the reactor's currently maximum operating power of 90 kW, and a few higher power levels to analyze thermohydraulics and heat transfer aspects in determining a design basis for higher power including the cost estimate. It was found that the natural convection current becomes much more pronounced at higher power levels with vortex shedding also occurring. A departure from nucleate boiling analysis showed that while nucleate boiling begins near 210 kW it remains in this state and does not approach the critical heat flux at powers up to 500 kW. Based on these studies, two upgrades are proposed for extended operation and possibly higher reactor power level. Together with the findings from Part I studies, we conclude that increase of the reactor power is highly feasible yet dependable on its purpose and associated investments.

  19. Subsidiary Upgrading?

    DEFF Research Database (Denmark)

    Gammelgaard, Jens; Dörrenbächer, Christoph

    2004-01-01

    AbstractThis study reports the results of interviews with 65 managers in 11 Germanheadquarters and in their 13 Hungarian subsidiaries. We focused on the role of thesubsidiary with regard to market, product and value-adding mandates. Further, weinvestigated whether the Hungarian subsidiaries had e......, ethnocentric behaviours emanating from the headquarters should be includedin future upgrading analyses....

  20. Design, Fabrication and High Power RF Test of a C-band Accelerating Structure for Feasibility Study of the SPARC photo-injector energy upgrade

    CERN Document Server

    Alesini, D.; Di Pirro, G.; Di Raddo, R.; Ferrario, M.; Gallo, A.; Lollo, V.; Marcellini, F.; Higo, T.; Kakihara, K.; Matsumoto, S.; Campogiani, G.; Mostacci, A.; Palumbo, L.; Persichelli, S.; Spizzo, V.; Verdú-Andrés, S.

    2011-01-01

    The energy upgrade of the SPARC photo-injector from 160 to more than 260 MeV will be done by replacing a low gradient 3m S-Band structure with two 1.4m high gradient C-band structures. The structures are travelling wave, constant impedance sections, have symmetric waveguide input couplers and have been optimized to work with a SLED RF input pulse. A prototype with a reduced number of cells has been fabricated and tested at high power in KEK (Japan) giving very good performances in terms of breakdown rates (10^6 bpp/m) at high accelerating gradient (>50 MV/m). The paper illustrates the design criteria of the structures, the fabrication procedure and the high power RF test results.

  1. Operating and Managing a Backup Control Center

    Science.gov (United States)

    Marsh, Angela L.; Pirani, Joseph L.; Bornas, Nicholas

    2010-01-01

    Due to the criticality of continuous mission operations, some control centers must plan for alternate locations in the event an emergency shuts down the primary control center. Johnson Space Center (JSC) in Houston, Texas is the Mission Control Center (MCC) for the International Space Station (ISS). Due to Houston s proximity to the Gulf of Mexico, JSC is prone to threats from hurricanes which could cause flooding, wind damage, and electrical outages to the buildings supporting the MCC. Marshall Space Flight Center (MSFC) has the capability to be the Backup Control Center for the ISS if the situation is needed. While the MSFC Huntsville Operations Support Center (HOSC) does house the BCC, the prime customer and operator of the ISS is still the JSC flight operations team. To satisfy the customer and maintain continuous mission operations, the BCC has critical infrastructure that hosts ISS ground systems and flight operations equipment that mirrors the prime mission control facility. However, a complete duplicate of Mission Control Center in another remote location is very expensive to recreate. The HOSC has infrastructure and services that MCC utilized for its backup control center to reduce the costs of a somewhat redundant service. While labor talents are equivalent, experiences are not. Certain operations are maintained in a redundant mode, while others are simply maintained as single string with adequate sparing levels of equipment. Personnel at the BCC facility must be trained and certified to an adequate level on primary MCC systems. Negotiations with the customer were done to match requirements with existing capabilities, and to prioritize resources for appropriate level of service. Because some of these systems are shared, an activation of the backup control center will cause a suspension of scheduled HOSC activities that may share resources needed by the BCC. For example, the MCC is monitoring a hurricane in the Gulf of Mexico. As the threat to MCC

  2. The near-source impacts of diesel backup generators in urban environments

    Science.gov (United States)

    Tong, Zheming; Zhang, K. Max

    2015-05-01

    Distributed power generation, located close to consumers, plays an important role in the current and future power systems. However, its near-source impacts in complex urban environments are not well understood. In this paper, we focused on diesel backup generators that participate in demand response (DR) programs. We first improved the micro-environmental air quality simulations by employing a meteorology processor, AERMET, to generate site-specific boundary layer parameters for the Large Eddy Simulation (LES) modeling. The modeling structure was then incorporated into the CTAG model to evaluate the environmental impacts of diesel backup generators in near-source microenvironments. We found that the presence of either tall upwind or downwind building can deteriorate the air quality in the near-stack street canyons, largely due to the recirculation zones generated by the tall buildings, reducing the near-stack dispersion. Decreasing exhaust momentum ratio (stack exit velocity/ambient wind velocity) draws more exhaust into the recirculation zone, and reduces the effective stack height, which results in elevated near-ground concentrations inside downwind street canyons. The near-ground PM2.5 concentration for the worst scenarios could well exceed 100 μg m-3, posing potential health risk to people living and working nearby. In general, older diesel backup generators (i.e., Tier 1, 2 or older) without the up-to-date emission control may significantly increase the pollutant concentration in the near-source street canyons if participating in DR programs. Even generators that comply with Tier-4 standards could lead to PM hotspots if their stacks are next to tall buildings. Our study implies that the siting of diesel backup generators stacks should consider not only the interactions of fresh air intake and exhaust outlet for the building housing the backup generators, but also the dispersion of exhaust plumes in the surrounding environment.

  3. Evaluation of a sitting aid: The Back-Up

    NARCIS (Netherlands)

    Vink, P.; Douwes, M.; Woensel, W. van

    1994-01-01

    The effects of a portable back support, the Back-Up, were tested in 28 variables. Both subjective and objective physical load measures were recorded during sitting with and without Back-Up, most of them during VDU work. The main result was that the posture of the upper back and neck/head was

  4. ATLAS UPGRADES

    CERN Document Server

    Lacasta, C; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. In parallel the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for ...

  5. Backup agreements with penalty scheme under supply disruptions

    Science.gov (United States)

    Hou, Jing; Zhao, Lindu

    2012-05-01

    This article considers a supply chain for a single product involving one retailer and two independent suppliers, when the main supplier might fail to supply the products, the backup supplier can always supply the products at a higher price. The retailer could use the backup supplier as a regular provider or a stand-by source by reserving some products at the supplier. A backup agreement with penalty scheme is constructed between the retailer and the backup supplier to mitigate the supply disruptions and the demand uncertainty. The expected profit functions and the optimal decisions of the two players are derived through a sequential optimisation process. Then, the sensitivity of two players' expected profits to various input factors is examined through numerical examples. The impacts of the disruption probability and the demand uncertainty on the backup agreement are also investigated, which could provide guideline for how to use each sourcing method.

  6. Questions to the reactors power upgrade of the Nuclear Power Plant of Laguna Verde; Cuestionamientos al aumento de potencia de los reactores de la Central Nuclear de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Salas M, B., E-mail: salasmarb@yahoo.com.mx [UNAM, Facultad de Ciencias, Departamento de Fisica, Circuito exterior s/n, Ciudad Universitaria, 04510 Mexico D. F. (Mexico)

    2014-08-15

    The two reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) were subjected to power upgrade labors with the purpose of achieving 20% upgrade on the original power; these labors concluded in August 24, 2010 for the Reactor 1 and in January 16, 2011 for the Reactor 2, however in January of 2014, the NNP-L V has not received by part of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) the new Operation License to be able to work with the new power, because it does not fulfill all the necessary requirements of safety. In this work is presented and analyzed the information obtained in this respect, with data provided by the Instituto Federal de Acceso a la Informacion Publica y Proteccion de Datos (IFAI) and the Comision Federal de Electricidad (CFE) in Mexico, as well as the opinion of some workers of the NPP-L V. The Governing Board of the CFE announcement that will give special continuation to the behavior on the operation and reliability of the NPP-L V, because the frequency of not announced interruptions was increased 7 times more in the last three years. (Author)

  7. Experience from design, prototyping and production of a DC-DC conversion powering scheme for the CMS Phase-1 Pixel Upgrade

    Science.gov (United States)

    Feld, L.; Karpinski, W.; Klein, K.; Lipinski, M.; Preuten, M.; Rauch, M.; Schmitz, S.; Wlochal, M.

    2016-02-01

    The CMS collaboration has adopted a DC-DC conversion powering scheme for the Phase-1 Upgrade of its pixel detector. DC-DC buck converters with a conversion ratio of around 3 are installed on the support structures, outside of the sensitive tracking region, requiring a re-design of the low and high voltage distribution to the pixel modules. After several years of R&D, the project has entered the production phase. A total of 1800 DC-DC converters are being produced, and rigorous quality assurance and control is being employed during the production process. The testing program is outlined, results from mass production are presented and issues that have been encountered are described. In addition, two system level challenges, namely the choice of output voltage in the presence of large, load-dependent voltage drops, and the thermal management required to remove the heat load caused by the DC-DC converters, are discussed.

  8. The challenge of backup power in the NPP after the accident at Fukushima, alternatives; El reto de la energia de resplado en las CC.NN. despues del accidente de Fukushima, alternativas

    Energy Technology Data Exchange (ETDEWEB)

    Contreras, C.; Gomez, A.; Gavilan, C.; Archilla, J.; Tagle, J. A.

    2014-07-01

    After the accident in Fukushima has been demonstrated the importance of having in the first hours with an independent power supply of the emergency diesel generators. In conclusion it can be said that usual (Pb batteries) storage technology is insufficient, since much more space in the rooms would be needed to achieve the required stored energy. And although just appear on the market solutions alternatives, the most advanced battery technologies still have some problems to be able to use in these applications with guarantees. A solution that arises is the combination of batteries and fuel cells. On the other hand is needed a closer collaboration with researchers and developers of batteries so that they take into account the needs of plants, so that manufactured batteries with more density energy, more power and they are more reliable. These features provide benefits in other fields besides nuclear plants. (Author)

  9. Upgraded Coal Interest Group

    Energy Technology Data Exchange (ETDEWEB)

    Evan Hughes

    2009-01-08

    The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

  10. Oracle Database 12c backup and recovery survival guide

    CERN Document Server

    Alvarez, Francisco Munoz

    2013-01-01

    The book follows a tutorial-based approach, covering all the best practices for backup and recovery. The book starts by introducing readers to the world of backup and recovery, then moves on to teach them the new features offered by Oracle 12c. The book is full of useful tips and best practices that are essential for any DBA to perform backup and recovery operations in an organization.This book is designed for Oracle DBAs and system administrators. The reader will have a basic working experience of administering Oracle databases. This book is designed for Oracle DBAs and system administrators.

  11. An Actuator Control Unit for Safety-Critical Mechatronic Applications with Embedded Energy Storage Backup

    Directory of Open Access Journals (Sweden)

    Sergio Saponara

    2016-03-01

    Full Text Available This paper presents an actuator control unit (ACU with a 450-J embedded energy storage backup to face safety critical mechatronic applications. The idea is to ensure full operation of electric actuators, even in the case of battery failure, by using supercapacitors as a local energy tank. Thanks to integrated switching converter circuitry, the supercapacitors provide the required voltage and current levels for the required time to guarantee actuator operation until the system enters into safety mode. Experimental results are presented for a target application related to the control of servomotors for a robotized prosthetic arm. Mechatronic devices for rehabilitation or assisted living of injured and/or elderly people are available today. In most cases, they are battery powered with lithium-based cells, providing high energy density and low weight, but at the expense of a reduced robustness compared to lead-acid- or nickel-based battery cells. The ACU of this work ensures full operation of the wearable robotized arm, controlled through acceleration and electromyography (EMG sensor signals, even in the case of battery failure, thanks to the embedded energy backup unit. To prove the configurability and scalability of the proposed solution, experimental results related to the electric actuation of the car door latch and of a robotized gearbox in vehicles are also shown. The reliability of the energy backup device has been assessed in a wide temperature range, from −40 to 130 °C, and in a durability test campaign of more than 10,000 cycles. Achieved results prove the suitability of the proposed approach for ACUs requiring a burst of power of hundreds of watts for only a few seconds in safety-critical applications. Alternatively, the aging and temperature characterizations of energy backup units is limited to supercapacitors of thousands of farads for high power applications (e.g., electric/hybrid propulsion and with a temperature range limited to

  12. Development of an ADC radiation tolerance characterization system for the upgrade of the ATLAS LAr calorimeter

    Science.gov (United States)

    Liu, Hong-Bin; Chen, Hu-Cheng; Chen, Kai; Kierstead, James; Lanni, Francesco; Takai, Helio; Jin, Ge

    2017-02-01

    ATLAS LAr calorimeter will undergo its Phase-I upgrade during the long shutdown (LS2) in 2018, and a new LAr Trigger Digitizer Board (LTDB) will be designed and installed. Several commercial-off-the-shelf (COTS) multi-channel high-speed ADCs have been selected as possible backups of the radiation tolerant ADC ASICs for the LTDB. To evaluate the radiation tolerance of these backup commercial ADCs, we developed an ADC radiation tolerance characterization system, which includes the ADC boards, data acquisition (DAQ) board, signal generator, external power supplies and a host computer. The ADC board is custom designed for different ADCs, with ADC drivers and clock distribution circuits integrated on board. The Xilinx ZC706 FPGA development board is used as a DAQ board. The data from the ADC are routed to the FPGA through the FMC (FPGA Mezzanine Card) connector, de-serialized and monitored by the FPGA, and then transmitted to the host computer through the Gigabit Ethernet. A software program has been developed with Python, and all the commands are sent to the DAQ board through Gigabit Ethernet by this program. Two ADC boards have been designed for the ADC, ADS52J90 from Texas Instruments and AD9249 from Analog Devices respectively. TID tests for both ADCs have been performed at BNL, and an SEE test for the ADS52J90 has been performed at Massachusetts General Hospital (MGH). Test results have been analyzed and presented. The test results demonstrate that this test system is very versatile, and works well for the radiation tolerance characterization of commercial multi-channel high-speed ADCs for the upgrade of the ATLAS LAr calorimeter. It is applicable to other collider physics experiments where radiation tolerance is required as well. Supported by the U. S. Department of Energy (DE-SC001270)

  13. Market Design for a P2P Backup System

    Science.gov (United States)

    Seuken, Sven; Charles, Denis; Chickering, Max; Puri, Sidd

    Peer-to-peer (P2P) backup systems are an attractive alternative to server-based systems because the immense costs of large data centers can be saved by using idle resources on millions of private computers instead. This paper presents the design and theoretical analysis of a market for a P2P backup system. While our long-term goal is an open resource exchange market using real money, here we consider a system where monetary transfers are prohibited. A user who wants to backup his data must in return supply some of his resources (storage space, upload and download bandwidth) to the system.We propose a hybrid P2P architecture where all backup data is transferred directly between peers, but a dedicated server coordinates all operations and maintains meta-data. We achieve high reliability guarantees while keeping our data replication factor low by adopting sophisticated erasure coding technology (cf., [2]).

  14. Effective Data Backup System Using Storage Area Network Solution

    African Journals Online (AJOL)

    PROF. OLIVER OSUAGWA

    2015-06-01

    Jun 1, 2015 ... Abstract. One of the most crucial benefits of the computer system is its ability to manage data send to it for ... Keywords: Backup, Storage area network, Data, Effective and Data loss ... network can use existing communication.

  15. Independent backup mode transfer and mechanism for digital control computers

    Science.gov (United States)

    Tulpule, Bhalchandra R. (Inventor); Oscarson, Edward M. (Inventor)

    1992-01-01

    An interrupt is provided to a signal processor having a non-maskable interrupt input, in response to the detection of a request for transfer to backup software. The signal processor provides a transfer signal to a transfer mechanism only after completion of the present machine cycle. Transfer to the backup software is initiated by the transfer mechanism only upon reception of the transfer signal.

  16. 在命令行中运行Backup Exec

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    我需要在Windows Server 2003和Windows 2000 Server上使用VERITAS软件的Backup Exec for Windows Servers。问题是我对这两种操作系统都不熟悉.而且我喜欢在命令行中执行任务。我能够使用命令行或者脚本来操作BackupExec吗?

  17. Design Studies of a Low Power Serial Data Link for a possible Upgrade of the CMS Pixel Detector

    CERN Document Server

    Meier, B

    2008-01-01

    The material budget inside the sensitive tracking volume is highly dependent on the dissipated power for data transmission. It is therefore important to have a very low power serial data link, which allows transmission of digital data over short distances within the tracking volume. This low power ohmic data transmission through micro-twisted transmission lines aims for a transmission speed of 160/320 MHz and allows concentration of the tracker data to multi gigabit optical data hubs. For such a future link we need low swing differential drivers and receivers with PLLs for frequency multipliers and clock recovery. We have implemented in radiation hard layout all the necessary components on a recently submitted 250nm CMOS test chip. After reporting on the experience gained with low power data transmission in the current CMS pixel detector, we present the design considerations and first results for this new 160/320 MHz serial link that may work with differential signal levels as low as 10mV.

  18. Addressing Obsolescence in Operating Power Stations by Implementation of Safety Related Digital Upgrades Paper for Spanish Nuclear Society

    Energy Technology Data Exchange (ETDEWEB)

    Legrand, R.

    2014-07-01

    Obsolescence of Instrumentation and Controls is a major problem facing operating Nuclear Power Stations globally. AREVA is the only supplier that has supported the successful licensing, engineering, procurement, installation and commissioning of a full-scope digital Instrumentation and Control (I and C) Protection System in the United States. (Author)

  19. Environmental Assessment for Electrical Power System Upgrades at Los Alamos National Laboratory, Los Alamos, New Mexico - Final Document

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-03-09

    The ''National Environmental Policy Act of 1969'' (NEPA) requires Federal agency officials to consider the environmental consequences of their proposed actions before decisions are made. In complying with NEPA, the United States (U.S.) Department of Energy (DOE) follows the Council on Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508) and DOE's NEPA implementing procedures (10 CFR 1021). The purpose of an Environmental Assessment (EA) is to provide Federal decision makers with sufficient evidence and analysis to determine whether to prepare an Environmental Impact Statement (EIS) or issue a Finding of No Significant Impact. In this case, the DOE decision to be made is whether to construct and operate a 19.5-mile (mi) (31-kilometer [km]) electric transmission line (power line) reaching from the Norton Substation, west across the Rio Grande, to locations within the Los Alamos National Laboratory (LANL) Technical Areas (TAs) 3 and 5 at Los Alamos, New Mexico. The construction of one electric substation at LANL would be included in the project as would the construction of two line segments less than 1,200 feet (ft) (366 meters [m]) long that would allow for the uncrossing of a portion of two existing power lines. Additionally, a fiber optics communications line would be included and installed concurrently as part of the required overhead ground conductor for the power line. The new power line would improve the reliability of electric service in the LANL and Los Aktrnos County areas as would the uncrossing of the crossed segments of the existing lines. Additionally, installation of the new power line would enable the LANL and the Los Alamos County electric grid, which is a shared resource, to be adapted to accommodate the future import of increased power when additional power service becomes available in the northern New Mexico area. Similarly, the fiber optics line would allow DOE to take advantage of

  20. High-power test of annular-ring coupled structures for the J-PARC linac energy upgrade

    Science.gov (United States)

    Tamura, Jun; Ao, Hiroyuki; Nemoto, Yasuo; Asano, Hiroyuki; Suzuki, Takahiro

    2015-02-01

    Annular-ring coupled structures (ACSs) will increase the beam energy of the Japan proton accelerator research complex (J-PARC) linac from 181 to 400 MeV to achieve a beam power of 1 MW for a materials and life science experimental facility. The mass production of the ACS cavities commenced in March 2009. Before the installation, all cavities require power testing. High-power testing is essential not only for confirming the cavity's design performance but also for preventing delays in cavity conditioning schedule. However, the 2011 Tohoku earthquake damaged J-PARC facilities, including the ACS power-test area, and cavity conditioning was interrupted for two years. After the facility's restoration, two ACS cavities (M01 and M11) were conditioned. They performed 15-20% above the designed accelerating field of 4.2 MV/m. As M01 was initially conditioned six years ago, the most recent conditioning time required for M01 was drastically reduced. From this result, we confirmed that long-term stored ACS cavities purged with nitrogen gas do not produce critical cavity performance issues. During high-power operation of M11, which is a unique cavity equipped with a capacitive iris in a waveguide, no significant increases in the temperature and the discharge rate around the capacitive iris were observed. Even considering beam loss due to residual gas scattering, the vacuum pressure was sufficiently low (4 × 10-6 Pa). More stable operation can be expected following a month-long conditioning process before the beam is commissioned. M11's conditioning successfully demonstrated an auto-conditioning program, and we established the conditioning scheme using this auto-conditioning program for all ACS cavities in a limited time and with limited manpower.

  1. Human factors design, verification, and validation for two types of control room upgrades at a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Boring, Laurids Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-10-01

    This paper describes the NUREG-0711 based human factors engineering (HFE) phases and associated elements required to support design, verification and validation (V&V), and implementation of a new plant process computer (PPC) and turbine control system (TCS) at a representative nuclear power plant. This paper reviews ways to take a human-system interface (HSI) specification and use it when migrating legacy PPC displays or designing displays with new functionality. These displays undergo iterative usability testing during the design phase and then undergo an integrated system validation (ISV) in a full scope control room training simulator. Following the successful demonstration of operator performance with the systems during the ISV, the new system is implemented at the plant, first in the training simulator and then in the main control room.

  2. Back-Up/ Peak Shaving Fuel Cell System

    Energy Technology Data Exchange (ETDEWEB)

    Staudt, Rhonda L.

    2008-05-28

    This Final Report covers the work executed by Plug Power from 8/11/03 – 10/31/07 statement of work for Topic 2: advancing the state of the art of fuel cell technology with the development of a new generation of commercially viable, stationary, Back-up/Peak-Shaving fuel cell systems, the GenCore II. The Program cost was $7.2 M with the Department of Energy share being $3.6M and Plug Power’s share being $3.6 M. The Program started in August of 2003 and was scheduled to end in January of 2006. The actual program end date was October of 2007. A no cost extension was grated. The Department of Energy barriers addressed as part of this program are: Technical Barriers for Distributed Generation Systems: o Durability o Power Electronics o Start up time Technical Barriers for Fuel Cell Components: o Stack Material and Manufacturing Cost o Durability o Thermal and water management Background The next generation GenCore backup fuel cell system to be designed, developed and tested by Plug Power under the program is the first, mass-manufacturable design implementation of Plug Power’s GenCore architected platform targeted for battery and small generator replacement applications in the telecommunications, broadband and UPS markets. The next generation GenCore will be a standalone, H2 in-DC-out system. In designing the next generation GenCore specifically for the telecommunications market, Plug Power is teaming with BellSouth Telecommunications, Inc., a leading industry end user. The final next generation GenCore system is expected to represent a market-entry, mass-manufacturable and economically viable design. The technology will incorporate: • A cost-reduced, polymer electrolyte membrane (PEM) fuel cell stack tailored to hydrogen fuel use • An advanced electrical energy storage system • A modular, scalable power conditioning system tailored to market requirements • A scaled-down, cost-reduced balance of plant (BOP) • Network Equipment Building Standards (NEBS), UL

  3. LHCb DAQ network upgrade tests

    CERN Document Server

    Pisani, Flavio

    2013-01-01

    My project concerned the evaluation of new technologies for the DAQ network upgrade of LHCb. The first part consisted in developing and Open Flow-based Clos network. This new technology is very interesting and powerful but, as shown by the results, it still needs further improvements. The second part consisted in testing and benchmarking 40GbE network equipment: Mellanox MT27500, Chelsio T580 and Huawei Cloud Engine 12804. An event-building simulation is currently been performed in order to check the feasibility of the DAQ network upgrade in LS2. The first results are promising.

  4. Enhanced networked server management with random remote backups

    Science.gov (United States)

    Kim, Song-Kyoo

    2003-08-01

    In this paper, the model is focused on available server management in network environments. The (remote) backup servers are hooked up by VPN (Virtual Private Network) and replace broken main severs immediately. A virtual private network (VPN) is a way to use a public network infrastructure and hooks up long-distance servers within a single network infrastructure. The servers can be represent as "machines" and then the system deals with main unreliable and random auxiliary spare (remote backup) machines. When the system performs a mandatory routine maintenance, auxiliary machines are being used for backups during idle periods. Unlike other existing models, the availability of auxiliary machines is changed for each activation in this enhanced model. Analytically tractable results are obtained by using several mathematical techniques and the results are demonstrated in the framework of optimized networked server allocation problems.

  5. Recovery Act. Tapoco project. Cheoah upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tran, Paul [Alcoa Inc., Alcoa Center, PA (United States)

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  6. UPGRADE REVAMP ON UNINTERRUPTED POWER SUPPLY SYSTEM OF AIR PRESSURE POWER STATION%动力空压站UPS不间断供电系统升级改造

    Institute of Scientific and Technical Information of China (English)

    耿新军

    2015-01-01

    针对动力空压站UPS系统设备超期服役、元器件老化、安装地点不适宜、系统电源配置不合理等现状,重点从设备选型、变更安装地点、优化系统配置方面进行升级改造。项目实施后,实现了高效、稳定运行。%Aimed at current situations of overtime service, aging of components and parts, unsuitable installation site and unreasonable electrical source formulation existing in uninterrupt-ed power supply ( UPS) system of the air pressure power station, revamps involving equipment selection, alteration of the installation site and optimization on system formulation were mainly executed.High efficiency and stable running of the uninterrupted power supply system was real-ized after the upgrade revamp.

  7. RELAP5-3D Restart and Backup Verification Testing

    Energy Technology Data Exchange (ETDEWEB)

    Dr. George L Mesina

    2013-09-01

    Existing testing methodology for RELAP5-3D employs a set of test cases collected over two decades to test a variety of code features and run on a Linux or Windows platform. However, this set has numerous deficiencies in terms of code coverage, detail of comparison, running time, and testing fidelity of RELAP5-3D restart and backup capabilities. The test suite covers less than three quarters of the lines of code in the relap directory and just over half those in the environmental library. Even in terms of code features, many are not covered. Moreover, the test set runs many problems long past the point necessary to test the relevant features. It requires standard problems to run to completion. This is unnecessary for features can be tested in a short-running problem. For example, many trips and controls can be tested in the first few time steps, as can a number of fluid flow options. The testing system is also inaccurate. For the past decade, the diffem script has been the primary tool for checking that printouts from two different RELAP5-3D executables agree. This tool compares two output files to verify that all characters are the same except for those relating to date, time and a few other excluded items. The variable values printed on the output file are accurate to no more than eight decimal places. Therefore, calculations with errors in decimal places beyond those printed remain undetected. Finally, fidelity of restart is not tested except in the PVM sub-suite and backup is not specifically tested at all. When a restart is made from any midway point of the base-case transient, the restart must produce the same values. When a backup condition occurs, the code repeats advancements with the same time step. A perfect backup can be tested by forcing RELAP5 to perform a backup by falsely setting a backup condition flag at a user-specified-time. Comparison of the calculations of that run and those produced by the same input w/o the spurious condition should be

  8. Upgrading Li-battery performance via nanotechnology

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    @@ Lithium batteries,as a main or back-up power source for mobile communication devices,portable electronic devices and the like,have attracted much attention in the scientific and industrial fields due to their high electromotive force and high energy density.To meet the demand for batteries with higher energy density and improved cycle characteristics in recent years,many attempts have been made to develop new electrode materials or design new structures of electrode materials.

  9. A Novel Method of Remote Battery Back-up for A DMS Sub-station

    Directory of Open Access Journals (Sweden)

    Suba Srinivasan

    2014-12-01

    Full Text Available This study presents a remote battery backup for Distribution Management System substation. It elucidates the importance of the battery at the substation and the necessity of the automation at the substation. By achieving this we can remotely check the health of the battery from Back Control Center. It also enlightens the affects of the unavailability of power supply and how the charger gets activated and gives supply to the motors connected to the isolators and also acts as auxiliary supply to the Field Remote Terminal Unit until the station comes online.

  10. ISTTOK control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Ivo S., E-mail: ivoc@ipfn.ist.utl.pt; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-10-15

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel{sup ®} Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators.

  11. A Multi-Backup Path Protection scheme for survivability in Elastic Optical Networks

    Science.gov (United States)

    Yadav, Dharmendra Singh; Chakraborty, Abhishek; Manoj, B. S.

    2016-07-01

    Two important challenges in designing a survivable optical network are minimizing backup spectrum allocation and ensuring spectrum assignment constraints. Allocating backup spectrum is one important approach for survivable optical network design. Connection requests which are rejected due to the unavailability of a single backup path can be survived using multiple backup routes. Multiple backup routes not only increase connection acceptance rate, but also improve backup resource sharing. In this paper, we present a strategy for survivability which optimizes primary and backup spectrum allocations and multiple backup route assignments for surviving a connection request. In our strategy, named as Backup Spectrum Reservation with MultiPath Protection (BSR-MPP), multiple backup routes are searched over advance reserved backup resources when an optical connection is concerned. Simulation results show that confinement of backup resources result in higher resource sharing and assignment of multiple backup lightpaths. It can also be observed that BSR-MPP has lower Bandwidth Blocking Probability and higher spectrum efficiency as compared to conventional Shared Path Protection (SPP) and MultiPath Protection (MPP) strategies.

  12. Notice of construction for proposed backup package boiler

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    The Hanford Site steam plant consists of coal-fired boilers located at the 200 East and the 200 West Areas. These boilers have provided steam to heat and cool facilities in the 200 Areas since the early 1940`s. As part of Project L-017, ``Steam System Rehabilitation, Phase II``, the 200 West Area coal-fired boilers will be permanently shut down. The shut down will only occur after a proposed package backup boiler (50,000 pounds per hour (lb/hr) steam, firing No. 2 oil) is installed at the 200 West Area. The proposed backup boiler will provide back-up services when the 200 East Area steam line, which provides steam to the 200 West Area, is down for maintenance or, when the demand for steam exceeds the supply available from the 200 East Plant. This application is a request for approval to construct and operate the package backup boiler. This request is being made pursuant to Washington Administration Code (WAC) Chapter 173-400, ``General Regulations for Air Pollution Sources``, and Chapter 173-460, ``Controls for New Sources of Toxic Air Pollutants``.

  13. FUEL HANDLING FACILITY BACKUP CENTRAL COMMUNICATIONS ROOM SPACE REQUIREMENTS CALCULATION

    Energy Technology Data Exchange (ETDEWEB)

    B. SZALEWSKI

    2005-03-22

    The purpose of the Fuel Handling Facility Backup Central Communications Room Space Requirements Calculation is to determine a preliminary estimate of the space required to house the backup central communications room in the Fuel Handling Facility (FHF). This room provides backup communications capability to the primary communication systems located in the Central Control Center Facility. This calculation will help guide FHF designers in allocating adequate space for communications system equipment in the FHF. This is a preliminary calculation determining preliminary estimates based on the assumptions listed in Section 4. As such, there are currently no limitations on the use of this preliminary calculation. The calculations contained in this document were developed by Design and Engineering and are intended solely for the use of Design and Engineering in its work regarding the FHF Backup Central Communications Room Space Requirements. Yucca Mountain Project personnel from Design and Engineering should be consulted before the use of the calculations for purposes other than those stated herein or use by individuals other than authorized personnel in Design and Engineering.

  14. Efficient Multi-Resolution Compression Algorithm for Disk-Based Backup and Recovery

    Institute of Scientific and Technical Information of China (English)

    WANG Dejun; WANG Lina; WANG Hui

    2006-01-01

    In this paper, we deal with the problem of improving backup and recovery performance by compressing redundancies in large disk-based backup system. We analyze some general compression algorithms; evaluate their scalability and applicability. We investigate the distribution features of the redundant data in whole system range, and propose a multi-resolution distributed compression algorithm which can discern duplicated data at granularity of file level, block level or byte level to reduce the redundancy in backup environment. In order to accelerate recovery, we propose a synthetic backup solution which stores data in a recovery-oriented way and can compose the final data in back-end backup server. Experiments show that this algorithm can greatly reduce bandwidth consumption, save storage cost, and shorten the backup and recovery time. We implement these technologies in our product, called H-info backup system, which is capable of achieving over 10x compression ratio in both network utilization and data storage during backup.

  15. Curing critical links in oscillator networks as power grid models

    CERN Document Server

    Rohden, Martin; Timme, Marc; Meyer-Ortmanns, Hildegard

    2015-01-01

    Modern societies crucially depend on the robust supply with electric energy. Blackouts of power grids can thus have far reaching consequences. During a blackout, often the failure of a single infrastructure, such as a critical transmission line, results in several subsequent failures that spread across large parts of the network. Preventing such large-scale outages is thus key for assuring a reliable power supply. Here we present a non-local curing strategy for oscillatory power grid networks based on the global collective redistribution of loads. We first identify critical links and compute residual capacities on alternative paths on the remaining network from the original flows. For each critical link, we upgrade lines that constitute bottlenecks on such paths. We demonstrate the viability of this strategy for random ensembles of network topologies as well as topologies derived from real transmission grids and compare the nonlocal strategy against local back-ups of critical links. These strategies are indep...

  16. A SWOT Analysis of the Various Backup Scenarios Used in Electronic Medical Record Systems.

    Science.gov (United States)

    Seo, Hwa Jeong; Kim, Hye Hyeon; Kim, Ju Han

    2011-09-01

    Electronic medical records (EMRs) are increasingly being used by health care services. Currently, if an EMR shutdown occurs, even for a moment, patient safety and care can be seriously impacted. Our goal was to determine the methodology needed to develop an effective and reliable EMR backup system. Our "independent backup system by medical organizations" paradigm implies that individual medical organizations develop their own EMR backup systems within their organizations. A "personal independent backup system" is defined as an individual privately managing his/her own medical records, whereas in a "central backup system by the government" the government controls all the data. A "central backup system by private enterprises" implies that individual companies retain control over their own data. A "cooperative backup system among medical organizations" refers to a networked system established through mutual agreement. The "backup system based on mutual trust between an individual and an organization" means that the medical information backup system at the organizational level is established through mutual trust. Through the use of SWOT analysis it can be shown that cooperative backup among medical organizations is possible to be established through a network composed of various medical agencies and that it can be managed systematically. An owner of medical information only grants data access to the specific person who gave the authorization for backup based on the mutual trust between an individual and an organization. By employing SWOT analysis, we concluded that a linkage among medical organizations or between an individual and an organization can provide an efficient backup system.

  17. Leveraging MPLS backup paths for distributed energy-aware traffic engineering

    NARCIS (Netherlands)

    François, Frederic; Wang, Ning; Moessner, Klaus; Georgoulas, Stylianos; O. Schmidt, de Ricardo

    2014-01-01

    Backup paths are usually pre-installed by network operators to protect against single link failures in backbone networks that use multi-protocol label switching. This paper introduces a new scheme called Green Backup Paths (GBP) that intelligently exploits these existing backup paths to perform ener

  18. Mathematical defense method of networked servers with controlled remote backups

    Science.gov (United States)

    Kim, Song-Kyoo

    2006-05-01

    The networked server defense model is focused on reliability and availability in security respects. The (remote) backup servers are hooked up by VPN (Virtual Private Network) with high-speed optical network and replace broken main severs immediately. The networked server can be represent as "machines" and then the system deals with main unreliable, spare, and auxiliary spare machine. During vacation periods, when the system performs a mandatory routine maintenance, auxiliary machines are being used for back-ups; the information on the system is naturally delayed. Analog of the N-policy to restrict the usage of auxiliary machines to some reasonable quantity. The results are demonstrated in the network architecture by using the stochastic optimization techniques.

  19. A Fully Computerized Method to Backup the Router Configuration File

    Directory of Open Access Journals (Sweden)

    Ghassan H.Majeed

    2007-01-01

    Full Text Available This paper presents a fully computerized method to backup the router configuration file. The method consists of a friendly graphical interface programmed by Java programming language The proposed method is compared with the two existing methods, namely: TFTP server method and Copy/Paste method. The comparison reveals that the proposed method has many advantages over the existing ones. The proposed method has been implemented on Cisco routers (series 2500, 2600 and 2800

  20. A textual analysis of the upgrading and reconstruction project of a waste incineration power plant%垃圾焚烧发电项目提标改造措施分析

    Institute of Scientific and Technical Information of China (English)

    张艳艳; 张蕊

    2013-01-01

    以某垃圾焚烧发电厂提标改造项目为例,对垃圾焚烧项目焚烧炉烟气污染物以及废水渗滤液提出较先进的治理方案,为总量减排提供一定的技术支持。%With the upgrading and reconstruction project of a waste incineration power plant as an example , Proposing advanced pollu-tion control scheme for the pollutant -leachate and furnace -gas of waste incineration project , which was provide technical support for the to-tal emission reduction .

  1. Overview of Telephone Exchange Heat Backup Technology%电话交换机的热备份技术概述

    Institute of Scientific and Technical Information of China (English)

    查洪球

    2012-01-01

    This paper deserises the bosic principle of the telephore switches in the power of bot backup and the control unit bot backup,which is in order to coullterparts can optimiza and infroke it.%本文详细介绍了电话交换机技术中的电源热各份和控制单元热备分技术中的基本原理,以利于同行进行优化和改进。

  2. Backup of Renewable Energy for an Electrical Island: Case Study of Israeli Electricity System—Current Status

    Directory of Open Access Journals (Sweden)

    A. Fakhouri

    2014-01-01

    Full Text Available The paper focuses on the quantitative analysis of Israeli Government’s targets of 10% renewable energy penetration by 2020 and determining the desired methodology (models for assessing the effects on the electricity market, addressing the fact that Israel is an electricity island. The main objective is to determine the influence of achieving the Government’s goals for renewable energy penetration on the need for backup in the Israeli electricity system. This work presents the current situation of the Israeli electricity market and the study to be taken in order to assess the undesirable effects resulting from the intermittency of electricity generated by wind and solar power stations as well as presents some solutions to mitigating these phenomena. Future work will focus on a quantitative analysis of model runs and determine the amounts of backup required relative to the amount of installed capacity from renewable resources.

  3. Backup of Renewable Energy for an Electrical Island: Case Study of Israeli Electricity System—Current Status

    Science.gov (United States)

    Fakhouri, A.; Kuperman, A.

    2014-01-01

    The paper focuses on the quantitative analysis of Israeli Government's targets of 10% renewable energy penetration by 2020 and determining the desired methodology (models) for assessing the effects on the electricity market, addressing the fact that Israel is an electricity island. The main objective is to determine the influence of achieving the Government's goals for renewable energy penetration on the need for backup in the Israeli electricity system. This work presents the current situation of the Israeli electricity market and the study to be taken in order to assess the undesirable effects resulting from the intermittency of electricity generated by wind and solar power stations as well as presents some solutions to mitigating these phenomena. Future work will focus on a quantitative analysis of model runs and determine the amounts of backup required relative to the amount of installed capacity from renewable resources. PMID:24624044

  4. Backup of renewable energy for an electrical island: case study of Israeli electricity system--current status.

    Science.gov (United States)

    Fakhouri, A; Kuperman, A

    2014-01-01

    The paper focuses on the quantitative analysis of Israeli Government's targets of 10% renewable energy penetration by 2020 and determining the desired methodology (models) for assessing the effects on the electricity market, addressing the fact that Israel is an electricity island. The main objective is to determine the influence of achieving the Government's goals for renewable energy penetration on the need for backup in the Israeli electricity system. This work presents the current situation of the Israeli electricity market and the study to be taken in order to assess the undesirable effects resulting from the intermittency of electricity generated by wind and solar power stations as well as presents some solutions to mitigating these phenomena. Future work will focus on a quantitative analysis of model runs and determine the amounts of backup required relative to the amount of installed capacity from renewable resources.

  5. Regulation effects of the German renewable energy act on the ecological upgrade of hydro-power plants. Results of a survey; Lenkungswirkung der Erneuerbare-Energien-Gesetze (EEG 2004 und 2009) fuer die oekologische Modernisierung von Wasserkraftanlagen. Ergebnisse einer Umfrage

    Energy Technology Data Exchange (ETDEWEB)

    Anderer, Pia [Ingenieurbuero Floecksmuehle GmbH, Aachen (Germany); Naumann, Stephan [Umweltbundesamt, Dessau (Germany)

    2013-06-01

    Germany lacks a unified register containing data on the equipment of hydropower stations with environmental facilities or of those subject to requirements for reducing the environmental impact on the status of waters. Thanks to the cooperation of the hydro-power plant operators, our survey allowed us for the first time to gain insight into the regulation effects of the German Renewable Energy Act (Erneuerbare-Energien-Gesetz; EEG) as well as into the ecological upgrade potential of German hydro-power plants. EEG 2004 and 2009 funded measures implemented at hydro-power stations are focused on ensuring a minimum flow as well as on longitudinal connectivity. This priority is consistent with the water management requirement of achieving the goals of the Water Framework Directive in this area. (orig.)

  6. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  7. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  8. Upgrading uncompetitive products economically

    DEFF Research Database (Denmark)

    Lu, Hua; Jensen, Christian Søndergaard

    2012-01-01

    the k products in T that can be upgraded to not be dominated by any products in P at the lowest cost. This problem is non-trivial due to not only the large data set sizes, but also to the many possibilities for upgrading a product. We identify and provide solutions for the different options...... by the join approach to prune upgrade candidates with uncompetitive upgrade costs. Empirical studies with synthetic and real data show that the join approach is efficient and scalable....

  9. Strategy of HIS Data Backup%HIS系统数据备份的策略

    Institute of Scientific and Technical Information of China (English)

    李晖; 熊志强

    2011-01-01

    随着计算机技术的飞速发展,数据安全显得日益重要,数据备份是保障数据安全的重要手段之一.医院信息系统(HIS)的数据有多样性、保存年限长、用户对数据的需求不确定性等特点,其备份策略也不太一样.从备份的分类谈到备份策略的选择,简述各种备份方式的实现方法,重点谈到HIS系统数据备份的策略,包括完全备份、差异备份、日志备份的建立以及本地备份、异地备份、磁带备份的选择等,尝试给中小医院的数据备份提供一种合适的备份方案.%With the rapid development of computer technology, the data security is more and more important, so data backup is one of the significant measures to guarantee the data security. The data of hospital information system (HIS),with features of variety, long hold time, and user' s uncertain demand to data, has different backup strategies. From the classification of backup to selection of backup strategy, it briefly states the realization ways of backup methods,especially the strategy of HIS data backup, including setup of full backup, differential backup, and log backup, as well as selection of native backup, remote backup, and tape backup, so as to provide a suitable backup plan to data backup for the small- and-medium sized hospital.

  10. MAST Upgrade - Construction Status

    CERN Document Server

    Milnes, Joe; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O'Gorman, Tom; Scannell, Rory

    2015-01-01

    The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: 1) Testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); 2) Adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and 3) Exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progr...

  11. MAST Upgrade – Construction Status

    Energy Technology Data Exchange (ETDEWEB)

    Milnes, Joe, E-mail: Joe.Milnes@ccfe.ac.uk; Ayed, Nizar Ben; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O’Gorman, Tom; Scannell, Rory

    2015-10-15

    Highlights: • Outlines unique capability of MAST-U, including divertor and diagnostic capability. • Describes progress made in the manufacture and assembly of key MAST-U components. • Highlights the design challenges that have been overcome. • Lists the key lessons learned thus far in the project. - Abstract: The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: (1) testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); (2) adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and (3) exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progress in delivering the upgraded diagnostic capability, the modification and upgrading of the NBI heating systems and the complete overhaul of the machine control infrastructure, including a new control room with full remote participation facilities.

  12. The Pegasus-Upgrade Experiment

    Science.gov (United States)

    Fonck, R. J.; Bongard, M. W.; Barr, J. L.; Frerichs, H. G.; Lewicki, B. T.; Reusch, J. A.; Schmitz, O.; Winz, G. R.

    2015-11-01

    Tokamak operation at near-unity aspect ratio provides access to advanced tokamak physics at modest parameters. High plasma current is accessible at very low toroidal field. This offers H-mode performance at Te levels that allow use of electrostatic and magnetic probe arrays through the edge pedestal region into the plasma core. An upgrade to the Pegasus ST is planned to exploit these features and pursue unique studies in three areas: local measurements of pedestal and ELM dynamics at Alfvenic timescales; direct measurement of the local plasma response to application of 3D magnetic perturbations with high spectral flexibility; and extension of Local Helicity Injection for nonsolenoidal startup to NSTX-U-relevant confinement and stability regimes. Significant but relatively low-cost upgrades to the facility are proposed: a new centerstack with larger solenoid and 2x the number of toroidal field conductors; a new TF power supply and conversion of the 200 MVA OH power supply to a cascaded multilevel inverter configuration; and installation of an extensive 3D-magnetic perturbation coil system for ELM mitigation and suppression studies. The upgraded facility will provide 0.3 MA plasmas with pulse lengths of 50-100 msec flattop, aspect ratio <1.25, and toroidal field up to 0.4 T. These research activities will be integrated into related efforts on DIII-D and NSTX-U. Work supported by US DOE grant DE-FG02-96ER54375.

  13. Superhilac upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Feinberg, B.; Brown, I.G.

    1985-05-01

    This project will increase the uranium output of the Bevalac heavy-ion facility from the currently available 10/sup 7/ to 5 x 10/sup 7/ ions/pulse, allowing accurate Lamb shift measurements to be made in U/sup 90 +/ and U/sup 91 +/ with important applications to the testing of quantum electrodynamics and the development of an x-ray laser. The injected beam intensity will be increased to make better use of the 10emA output space-charge limit of the Wideroe linac. Components will include a new high current MEtal Vapor Vacuum Arc (MEVVA) ion source along with an improved high current, high voltage Cockcroft-Walton power supply to handle the increased beam current. The Low Energy Beam Transport (LEBT) line will be upgraded with additional focusing to manage the increased space-charge forces and with an improved vacuum to reduce charge exchange losses. Finally, the phase matching between the 23MHz Wideroe linac and the 70MHz Alvarez linac will be improved by the addition of the appropriate buncher cavities. Physics design is underway and detailed engineering is scheduled to begin in October 1985, with installation slated for the 1986 summer shutdown.

  14. Development of an ADC Radiation Tolerance Characterization System for the Upgrade of the ATLAS LAr Calorimeter

    CERN Document Server

    INSPIRE-00445642; Chen, Kai; Kierstead, James; Lanni, Francesco; Takai, Helio; Jin, Ge

    2016-01-01

    ATLAS LAr calorimeter will perform its Phase-I upgrade during the long shut down (LS2) in 2018, a new LAr Trigger Digitizer Board (LTDB) will be designed and installed. Several commercial-off-the-shelf (COTS) multichannel high-speed ADCs have been selected as possible backups of the radiation tolerant ADC ASICs for LTDB. In order to evaluate the radiation tolerance of these back up commercial ADCs, we developed an ADC radiation tolerance characterization system, which includes the ADC boards, data acquisition (DAQ) board, signal generator, external power supplies and a host computer. The ADC board is custom designed for different ADCs, which has ADC driver and clock distribution circuits integrated on board. The Xilinx ZC706 FPGA development board is used as DAQ board. The data from ADC are routed to the FPGA through the FMC (FPGA Mezzanine Card) connector, de-serialized and monitored by the FPGA, and then transmitted to the host computer through the Gigabit Ethernet. A software program has been developed wit...

  15. Modification and upgrade of AzRISE/TEP solar photovoltaic test yard

    Science.gov (United States)

    Bennett, Whit; Fishgold, Asher; Lai, Teh; Elwood, Teri; Potter, Barrett G.; Simmons-Potter, Kelly

    2016-09-01

    The University of Arizona AzRISE (Arizona Research Institute for Solar Energy) and Tucson Electric Power solar test yard is currently undergoing renovations to upgrade and standardize the data acquisition capabilities throughout the yard. Test yard improvements have enabled increased data collection reliability through state-of-the-art and environmentallyrobust data logging and real-time analysis. Enhanced capabilities include 10 msec max. data resolution, precision PV backside temperature monitoring of both individual and strings of modules, measurement of both AC and DC outputs as well as GHI and POA irradiance, active data backup to eliminate data intermittency, and robust Ethernet connectivity for data collection. An on-site weather station, provides wind speed and direction, relative humidity, and air temperature data. The information collected is accessed remotely via web server and includes raw performance and environmental conditions as well as extracted figures of performance for systems under test. Complementing the UA's existing accelerated environmental-testing chamber, the new test yard acquisition capabilities have enabled high fidelity system and sub-system-level operational testing under a range of field-level test conditions. The combined facilities, thus, provide a full-spectrum testing resource for photovoltaic performance and degradation analysis. Specific measurement characteristics and sample data collected from a polysilicon module test string are utilized to illustrate test yard capabilities.

  16. Association Analysis of System Failure in Wide Area Backup Protection System

    Science.gov (United States)

    Zhang, Yagang; Sun, Yi

    2015-12-01

    Wide area backup protection algorithm based on fault component identification is the heart of the whole wide area backup protection system, its validity and reliability is a problem which needs to be first considered in the engineering practice applications of wide area backup protection system. Wide are backup protection algorithm mainly use two kinds of wide area information to realize protection criterion, one is electrical quantity information, such as voltage, current, etc. Another one is protection action and circuit breaker information. The wide area backup protection algorithm based on electrical quantity information is mainly utilizing the significant change of electrical quantity to search fault component, and the primary means include current differential method of wide area multi-measuring points, the comparison method of calculation and measurement, the multiple statistics method. In this paper, a novel and effective association analysis of system failure in wide area backup protection system will be discussed carefully, and the analytical results are successful and reliable.

  17. LHC Status and Upgrade Challenges

    Science.gov (United States)

    Smith, Jeffrey

    2009-11-01

    The Large Hadron Collider has had a trying start-up and a challenging operational future lays ahead. Critical to the machine's performance is controlling a beam of particles whose stored energy is equivalent to 80 kg of TNT. Unavoidable beam losses result in energy deposition throughout the machine and without adequate protection this power would result in quenching of the superconducting magnets. A brief overview of the machine layout and principles of operation will be reviewed including a summary of the September 2008 accident. The current status of the LHC, startup schedule and upgrade options to achieve the target luminosity will be presented.

  18. The LHCb Muon Upgrade

    CERN Multimedia

    Cardini, A

    2013-01-01

    The LHCb collaboration is currently working on the upgrade of the experiment to allow, after 2018, an efficient data collection while running at an instantaneous luminosity of 2x10$^{33}$/cm$^{-2}$s$^{-1}$. The upgrade will allow 40 MHz detector readout, and events will be selected by means of a very flexible software-based trigger. The muon system will be upgraded in two phases. In the first phase, the off-detector readout electronics will be redesigned to allow complete event readout at 40 MHz. Also, part of the channel logical-ORs, used to reduce the total readout channel count, will be removed to reduce dead-time in critical regions. In a second phase, higher-granularity detectors will replace the ones installed in highly irradiated regions, to guarantee efficient muon system performances in the upgrade data taking conditions.

  19. LEP is upgraded

    CERN Multimedia

    1995-01-01

    A superconducting radio-frequency cavity is installed on the Large Electron-Positron (LEP) collider. This upgrade, known as LEP-2, allowed the accelerator to reach new, higher energies and so investigate new areas of physics.

  20. Trajectory for Industrial Upgrade

    Institute of Scientific and Technical Information of China (English)

    LIU YUNYUN

    2010-01-01

    @@ The Ministry of Industry and Information Technology (MIIT) ordered the closure of outdated production lines in 18 industries as part of the country's plan to upgrade its industrial structure and move up the value chain.

  1. One year of operational experience with the upgraded and modernized Borssele nuclear power plant; Ein Jahr Erfahrung mit dem nachgeruesteten und modernisierten Kernkraftwerk Borssele

    Energy Technology Data Exchange (ETDEWEB)

    Bongers, J.W.M. [EPZ Kernenergie, Borssele (Netherlands); Wiersema, H.T. [KEMA Nuclear, Arnheim (Netherlands)

    1999-10-01

    The operating experience with the modernized Borssele NPP is excellent. The post upgrade operations showed some minor incidents related to the modernization. Part of the incidents were handled immediately, the others were solved during the 1998 outage. This outage was very well organized and executed, resulting in the shortest outage time ever achieved in Borssele. The plant availability in the first operating period after modernization ranged at over 90%. (orig.) [Deutsch] Mit dem modernisierten Kernkraftwerk Borssele wurden sehr gute Erfahrungen gemacht. Waehrend des Betriebes nach Abschluss der Modernisierungsarbeiten kam es zu einigen geringfuegigen Ereignissen, die durch die Modernisierungsmassnahmen verursacht worden waren. Einige dieser Probleme konnten sofort behoben werden, andere wurden waehrend der Revision im Jahre 1998 geloest. Diese Revision wurde hervorragend organisiert und ausgefuehrt und fuehrte dadurch zu den kuerzesten Ausfallzeiten, die jemals in Borssele erzielt wurden. Die Anlagenverfuegbarkeit lag in der ersten Betriebszeit nach den Umbaumassnahmen bei ueber 90%. (orig.)

  2. Optics upgrade for switchyard

    Energy Technology Data Exchange (ETDEWEB)

    Kobilarcik, Thomas R.; /Fermilab

    2005-08-01

    An upgrade of the Switchyard optics is proposed. This upgrade extends the P3 (old Main Ring) lattice through enclosure C. The septa for the 3-way Meson Area split is moved from enclosure F1 to enclosure M01. The functionality of the Meson Target Train is preserved. Finally, for the purpose of demonstrating that the resulting split can be transported, a straw-man lattice is proposed for enclosure M02 and beyond.

  3. LHC Upgrade Scenarios

    CERN Document Server

    Zimmermann, F

    2007-01-01

    The EU CARE-HHH and US-LARP studies for an LHC luminosity upgrade aim at increasing the peak luminosity by a factor of 10, to 1035 cm-2s-1. The luminosity can be raised by rebuilding the interaction regions (IRs) in combination with a consistent change of beam parameters. In addition to advanced low-beta quadrupoles, the upgraded IRs may accommodate other new elements such as slim s.c. dipoles or quadrupoles embedded deep inside the detectors, global low-angle crab cavities, and wire compensators of long-range beam-beam effects. Important constraints on the upgrade path are the maximum acceptable number of detector pile-up events, favoring many closely spaced bunches, and the heat load on the cold-magnet beam screens, pointing towards fewer and more intense bunches. In order to translate the increased peak luminosity into a correspondingly higher integrated luminosity, the upgrade of the LHC ring should be complemented by an upgrade of the injector complex. I will present preferred upgrade scenarios for the L...

  4. Fuel Cycle Comparison for Distributed Power Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Elgowainy, A. [Argonne National Lab. (ANL), Argonne, IL (United States); Wang, M. Q. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2008-11-15

    This report examines backup power and prime power systems and addresses the potential energy and environmental effects of substituting fuel cells for existing combustion technologies based on microturbines and internal combustion engines.

  5. Experience from design, prototyping and production of a DC-DC conversion powering scheme for the CMS Phase-1 Pixel Upgrade

    CERN Document Server

    Feld, Lutz Werner; Klein, Katja; Lipinski, Martin; Preuten, Marius; Rauch, Max Philip; Schmitz, Stefan Antonius; Wlochal, Michael

    2016-01-01

    The CMS pixel detector will be exchanged during the technical stop 2016/2017. To allow the new pixel detector to be powered with the legacy cable plant and power supplies, a novel powering scheme based on DC-DC conversion is employed. After the successful conclusion of an extensive development and prototyping phase, mass production of 1800 DC-DC converters as well as motherboards and other power PCBs has now been completed. This contribution reviews the lessons learned from the development of the power system for the Phase-1 pixel detector, and summarizes the experience from the production phase.

  6. Experience from design, prototyping and production of a DC-DC conversion powering scheme for the CMS Phase-1 Pixel Upgrade

    Science.gov (United States)

    Feld, Lutz; Karpinski, Waclaw; Klein, Katja; Lipinski, Martin; Preuten, Marius; Rauch, Max; Schmitz, Stefan; Wlochal, Michael

    2017-02-01

    The CMS pixel detector will be replaced during the technical stop 2016/2017. To allow the new pixel detector to be powered with the legacy cable plant and power supplies, a novel powering scheme based on DC-DC conversion will be employed. After the successful conclusion of an extensive development and prototyping phase, mass production of 1800 DC-DC converters as well as motherboards and other power PCBs has now been completed. This contribution reviews the lessons learned from the development of the power system for the Phase-1 pixel detector, and summarizes the experience gained from the production phase.

  7. Keeping the LHC in power

    CERN Document Server

    CERN Bulletin

    2013-01-01

    The critical safety equipment around the LHC, including the machine protection systems, is connected to Uninterruptible Power Supplies (UPS).  In case of mains failure, the UPS systems continue to power, for a limited time, these critical systems and ensure a safe shutdown of the accelerator. This week, work began to upgrade and replace over 100 UPS systems in the LHC.   The new UPS installations. For the LHC, even a perturbation on the mains is more than just an inconvenience: it often results in beam dumps and, in some cases, requires an energy extraction from superconducting circuits. When this occurs, machine protection systems, and in particular the Quench Protection System, must remain active to correctly carry out the shutdown procedure. With the UPS systems, 10 minutes of crucial power can be provided to the protection systems during this critical phase. There are currently two UPS systems in place in each one of the 32 LHC UPS zones. Originally one was used as a backup if ...

  8. RELAP5-3D Resolution of Known Restart/Backup Issues

    Energy Technology Data Exchange (ETDEWEB)

    Mesina, George L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Anderson, Nolan A. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-12-01

    The state-of-the-art nuclear reactor system safety analysis computer program developed at the Idaho National Laboratory (INL), RELAP5-3D, continues to adapt to changes in computer hardware and software and to develop to meet the ever-expanding needs of the nuclear industry. To continue at the forefront, code testing must evolve with both code and industry developments, and it must work correctly. To best ensure this, the processes of Software Verification and Validation (V&V) are applied. Verification compares coding against its documented algorithms and equations and compares its calculations against analytical solutions and the method of manufactured solutions. A form of this, sequential verification, checks code specifications against coding only when originally written then applies regression testing which compares code calculations between consecutive updates or versions on a set of test cases to check that the performance does not change. A sequential verification testing system was specially constructed for RELAP5-3D to both detect errors with extreme accuracy and cover all nuclear-plant-relevant code features. Detection is provided through a “verification file” that records double precision sums of key variables. Coverage is provided by a test suite of input decks that exercise code features and capabilities necessary to model a nuclear power plant. A matrix of test features and short-running cases that exercise them is presented. This testing system is used to test base cases (called null testing) as well as restart and backup cases. It can test RELAP5-3D performance in both standalone and coupled (through PVM to other codes) runs. Application of verification testing revealed numerous restart and backup issues in both standalone and couple modes. This document reports the resolution of these issues.

  9. The Improved Overhearing Backup AODV Protocol in MANET

    Directory of Open Access Journals (Sweden)

    Elham Zamani

    2016-01-01

    Full Text Available Mobile ad hoc network (MANET is one of the most widely used networks, which has attracted attentions, having features such as limited energy resources, limited bandwidth, and security weaknesses due to lack of a central infrastructure. Safe and suitable routing is one of the research aspects of MANET. In this paper, a proposed method, called M-AODV, which is a type of overhearing backup protocol, based on AODV, is presented. The simulation results of this protocol, applied by NS2 simulator, showed the improvement of packet delivery rate and reduction of overhead and delay. Moreover, to assess the security of the proposed protocol, we simulated M-AODV and AODV protocols under black hole and wormhole attacks, using no security solution. The results showed that M-AODV had been improved in terms of packet delivery ratio, and the delay had been reduced as well, but the amount of overhead had been increased.

  10. In-Network Redundancy Generation for Opportunistic Speedup of Backup

    CERN Document Server

    Pamies-Juarez, Lluis; Oggier, Frédérique

    2011-01-01

    Erasure coding is a storage-efficient alternative to replication for achieving reliable data backup in distributed storage systems. During the storage process, traditional erasure codes require a unique source node to create and upload all the redundant data to the different storage nodes. However, such a source node may have limited communication and computation capabilities, which constrain the storage process throughput. Moreover, the source node and the different storage nodes might not be able to send and receive data simultaneously -e.g., nodes might be busy in a datacenter setting, or simply be offline in a peer-to-peer setting- which can further threaten the efficacy of the overall storage process. In this paper we propose an "in-network" redundancy generation process that leverages on the self-repairing property of the novel SRC codes. This in-network redundancy generation allows storage nodes to generate new redundant data by exchanging partial information among themselves, improving the throughput ...

  11. Feasibility study of the university of Utah TRIGA reactor power upgrade - Part I: Neutronics-based study in respect to control rod system requirements and design

    Directory of Open Access Journals (Sweden)

    Ćutić Avdo

    2013-01-01

    Full Text Available We present a summary of extensive studies in determining the highest achievable power level of the current University of Utah TRIGA core configuration in respect to control rod requirements. Although the currently licensed University of Utah TRIGA power of 100 kW provides an excellent setting for a wide range of experiments, we investigate the possibility of increasing the power with the existing fuel elements and core structure. Thus, we have developed numerical models in combination with experimental procedures so as to assess the potential maximum University of Utah TRIGA power with the currently available control rod system and have created feasibility studies for assessing new core configurations that could provide higher core power levels. For the maximum determined power of a new University of Utah TRIGA core arrangement, a new control rod system was proposed.

  12. 30 CFR 75.1101-21 - Back-up water system.

    Science.gov (United States)

    2010-07-01

    ... AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-21 Back-up water system. One fire hose outlet together with a length of hose capable of extending to the belt drive... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Back-up water system. 75.1101-21 Section...

  13. Flight evaluation of a hydromechanical backup control for the digital electronic engine control system in an F100 engine

    Science.gov (United States)

    Walsh, K. R.; Burcham, F. W.

    1984-01-01

    The backup control (BUC) features, the operation of the BUC system, the BUC control logic, and the BUC flight test results are described. The flight test results include: (1) transfers to the BUC at military and maximum power settings; (2) a military power acceleration showing comparisons bvetween flight and simulation for BUC and primary modes; (3) steady-state idle power showing idle compressor speeds at different flight conditions; and (4) idle-to-military power BUC transients showing where cpmpressor stalls occurred for different ramp rates and idle speeds. All the BUC transfers which occur during the DEEC flight program are initiated by the pilot. Automatic transfers to the BUC do not occur.

  14. A focusing system control upgrade of MMF linac

    CERN Document Server

    Grekhov, O V; Kiselev, I V

    2001-01-01

    In this report the main principles of upgrade of focusing system control are given, new programs of focusing element power sources control are described, block diagrams of programs are submitted and algorithms of their functioning are represented.

  15. Cyclotron Institute Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Clark, Henry [Texas A& M University; Yennello, Sherry [Texas A& M University; Tribble, Robert [Texas A& M University

    2014-08-26

    The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

  16. The LHCb Detector Upgrade

    CERN Document Server

    Schindler, H

    2013-01-01

    The LHCb collaboration presented a Letter of Intent (LOI) to the LHCC in March 2011 for a major upgrading of the detector during Long Shutdown 2 (2018) and intends to collect a data sample of 50/fb in the LHC and High-Luminosity-LHC eras. The aim is to operate the experiment at an instantaneous luminosity 2.5 times above the present operational luminosity, which has already been pushed to twice the design value. Reading out the detector at 40MHz allows to increase the trigger efficiencies especially for the hadronic decay modes. The physics case and the strategy for the upgrade have been endorsed by the LHCC. This paper presents briefly the physics motivations for the LHCb upgrade and the proposed changes to the detector and trigger.

  17. The LHCb VELO upgrade

    CERN Document Server

    Collins, P; Poikela, T; Crossley, M; Kucharczyk, M; Whitehead, M; Dumps, R; Mountain, R; Artuso, M; Rodrigues, E; Tlustos, L; Papadelis, A; Buytaert, J; Blusk, S; Parkes, C; Xing, Z; Eklund, L; Coco, V; Michel, T; Campbell, M; Bowcock, T J V; Wang, J C; Akiba, K; Gligorov, V; Huse, T; Llin, L F; Gandelman, M; Plackett, R; Esperante, D; Maneuski, D; Bayer, F; Llopart, X; Alexander, M; Gallas, A; Nichols, M; van Beuzekom, M G; John, M

    2011-01-01

    The LHCb experiment at the LHC plans to massively increase its data taking capabilities by running at a higher luminosity with a fully upgraded detector around 2016. This scheme is independent of (but compatible with) the plans for the SLHC upgrades. The silicon detector will be upgraded to provide a 40 MHz readout and to be able to cope with the increased radiation environment. This paper describes the options currently under consideration. A highlight of the R\\&D so far undertaken is a beam test during summer 2009 using the Timepix chip to track charged particles. Preliminary results are presented, including a measurement of the resolution achieved by the 55 mu m pitch pixel array of better than 9.5 mu m for perpendicular tracks and 55 mu m for angled tracks. (C) 2010 Elsevier B.V. All rights reserved.

  18. ATLAS IBL Pixel Upgrade

    CERN Document Server

    La Rosa, A

    2011-01-01

    The upgrade for ATLAS detector will undergo different phase towards super-LHC. The first upgrade for the Pixel detector will consist of the construction of a new pixel layer which will be installed during the first shutdown of the LHC machine (LHC phase-I upgrade). The new detector, called Insertable B-Layer (IBL), will be inserted between the existing pixel detector and a new (smaller radius) beam-pipe at a radius of 3.3 cm. The IBL will require the development of several new technologies to cope with increase of radiation or pixel occupancy and also to improve the physics performance which will be achieved by reducing the pixel size and of the material budget. Three different promising sensor technologies (planar-Si, 3D-Si and diamond) are currently under investigation for the pixel detector. An overview of the project with particular emphasis on pixel module is presented in this paper

  19. Development of technology for teh advancement and modernization of power distribution. ; Kyushu Electric Power Co. Haiden kodokater dot kindaika no tame no gijutsu kaihatsu. ; Kyushu denryoku

    Energy Technology Data Exchange (ETDEWEB)

    1990-07-01

    Power distribution division of Kyushu Electric Power Co. has been promoting electricity upgrading, cost reduction by efficient business administration, and development of various kinds of new technology, in order to meet requirements for upgrading of electricity and power distribution facilities being in harmony with their environment. Power failure of high- or low-tension distribution lines while at work never happens since an indirect method car with a manipulator of which hot-line work is done by a robot and a temporary backup method car which temporarily backs up high-tension current during turning on electricity have been developed. By controlling load facilities of the users directly from the electric company with the centralized control system, power supply costs can be reduced. Moreover, by the data connection between the on-line system in the head office of the company and the automatic control system, labor saving and improvement in accuracy of the input work have been achieved. Now the company is developing or improving such new technologies toward the 21st century as a data transmission system at the time of accident, a different system loop switching unit, a civil work car for underground lines, and so on. 5 figs., 2 tabs.

  20. The UKIRT Upgrades Programme

    Science.gov (United States)

    Adamson, Andy; Davies, John; Robson, Ian

    Tim Hawarden presented this paper to the 30th anniversary workshop, just a month before his untimely death. The editors have done their best to convert his talk into this paper, and gratefully acknowledge the assistance of Nick Rees (a member of the Upgrades team, now at Diamond Light Source). Tim's discussion concerned the UKIRT Upgrades Project, which ran through the 1990s and transformed the telescope and made it truly competitive on the world stage for operation into the twenty-first century. The reference list at the end of the paper is comprehensive; some of these are referred to in the paper itself and some are included for completeness only.

  1. ATLAS/CMS Upgrades

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00370685; The ATLAS collaboration

    2016-01-01

    Precision studies of the Standard Model (SM) and the searches of the physics beyond the SM are ongoing at the ATLAS and CMS experiments at the Large Hadron Collider (LHC). A luminosity upgrade of LHC is planned, which provides a significant challenge for the experiments. In this report, the plans of the ATLAS and CMS upgrades are introduced. Physics prospects for selected topics, including Higgs coupling measurements, Bs,d -> mumu decays, and top quark decays through flavor changing neutral current, are also shown.

  2. High temperature ceramic membrane reactors for coal liquid upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-01-01

    In this project we will study a novel process concept, i.e., the use of ceramic membrane reactors in upgrading of coal model compounds and coal derived liquids. In general terms, the USC research team is responsible for constructing and operating the membrane reactor apparatus and for testing various inorganic membranes for the upgrading of coal derived asphaltenes and coal model compounds. The USC effort will involve the principal investigator of this project and two graduate research assistants. The ALCOA team is responsible for the preparation of the inorganic membranes, for construction and testing of the ceramic membrane modules, and for measurement of their transport properties. The ALCOA research effort will involve Dr. Paul K. T. Liu, who is the project manager of the ALCOA research team, an engineer and a technician. UNOCAL's contribution will be limited to overall technical assistance in catalyst preparation and the operation of the laboratory upgrading membrane reactor and for analytical back-up and expertise in oil analysis and materials characterization. UNOCAL is a no-cost contractor but will be involved in all aspects of the project, as deemed appropriate.

  3. Upgrading of Boundary Dam spillway

    Energy Technology Data Exchange (ETDEWEB)

    McPhail, Gordon; MacMillan, Dave; Smith, Bert [KGS Group, Winnipeg, (Canada); Lacelle, Justin [SaskPower, Regina, (Canada)

    2010-07-01

    An initial dam safety review was performed in 2005 and identified a number of concerns; the most critical were insufficient spillway capacity and deficiencies in the condition of the existing spillways. This paper described the challenges faced by the upgrading operation on the 50 year old Boundary Dam spillway started in 2008. SaskPower retained the KGS Group to increase the design spillway capacity to 1200 m3/s and remedy observed defects. The construction project involved maintaining the reservoir at full supply level while the 20m long spillway chute and stilling basin below were completely replaced. The difficulties came from the need to complete each year's construction such that the spillway could potentially pass spring flood flows. This paper showed that the upgrade measures selected for implementation were developed through close dialogue between the owner and the designer, with valuable input provided by a panel of external experts as well as from contractors participating in the design process.

  4. 大连市软实力的建设与提升%The construction and upgrading of soft power in Dalian

    Institute of Scientific and Technical Information of China (English)

    赵永勃

    2011-01-01

    自从约瑟夫·奈在20世纪90年代初首开软实力研究的先河以来,在过去的20余年中,软实力研究备受瞩目.认为在大连实施全域城市化发展战略中,加强软实力研究对创建大连和谐的人居生活环境和妥善解决民生问题等,具有十分现实的意义.在分析软实力的内涵、体系以及软实力与硬实力、软实力与区域竞争力、软实力与软环境的相互关系的基础上.从城市吸引力、区域影响力、文化感召力、城市凝聚力、区域创新力、教育发展力、政府公信力和社会和谐力等7个方面,研究大连市软实力的建设现状与提升要点.%Since Joseph Nye firstly began to study of soft power in the early 1990s, in the past 20 years, the soft power was highly valued. This paper argues that in the implementation of all-around urbanization development strategy of Dalian, the strengthening research on soft power has very realistic significance for creating harmonious living environment of Dalian and solving the People's livelihood issues properly. On the basis of analyzing the connotation and the system of the soft power and the relationship between soft power and hard power, soft power and regional competition, soft power and soft environment, this paper studies the construction situation and ascension points of the soft power of Dalian. From seven aspects, such as city attractive and regional influence, cultural charisma, urban cohesion, regional innovation, the education development force, the government credibility and social harmonious force.

  5. VISIR upgrade overview and status

    Science.gov (United States)

    Kerber, Florian; Käufl, Hans-Ulrich; Baksai, Pedro; Di Lieto, Nicola; Dobrzycka, Danuta; Duhoux, Philippe; Finger, Gert; Heikamp, Stephanie; Ives, Derek; Jakob, Gerd; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Sandrock, Stefan; Siebenmorgen, Ralf; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Valdes, Guillermo; Venema, Lars; Weilenmann, Ueli

    2014-07-01

    after which we plan to re-commission VISIR. In addition an upgrade of the IT infrastructure related to VISIR is planned in order to support burst-mode operations. The upgraded VISIR will be a powerful instrument providing close to background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes.

  6. Lightweight incremental application upgrade

    NARCIS (Netherlands)

    T. van der Storm (Tijs)

    2006-01-01

    textabstractI present a lightweight approach to incremental application upgrade in the context of component-based software development. The approach can be used to efficiently implement an automated update feature in a platform and programming language agnostic way. A formal release model is present

  7. LHCb VELO upgrade

    Science.gov (United States)

    Hennessy, Karol

    2017-02-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of 2×1033 cm-2 s-1. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have 55×55 μm2 pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The foil will be manufactured through milling and possibly thinned further by chemical etching. The material budget will be minimised by the use of evaporative CO2 coolant circulating in microchannels within 400 μm thick silicon substrates. The current status of the VELO upgrade is described and latest results from operation of irradiated sensor assemblies are presented.

  8. Upgrade of telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, work will be carried out on the CERN switching centre between Monday 23 October 8.00 p.m. and Tuesday 24 October 2.00 a.m. Telephone services may be disrupted and possibly even interrupted during this operation. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  9. Backup Sourcing Decisions for Coping with Supply Disruptions under Long-Term Horizons

    OpenAIRE

    Jing Hou; Lijun Sun

    2016-01-01

    This paper studies a buyer’s inventory control problem under a long-term horizon. The buyer has one major supplier that is prone to disruption risks and one backup supplier with higher wholesale price. Two kinds of sourcing methods are available for the buyer: single sourcing with/without contingent supply and dual sourcing. In contingent sourcing, the backup supplier is capacitated and/or has yield uncertainty, whereas in dual sourcing the backup supplier has an incentive to offer output fle...

  10. A Reliable Primary-Backup Routing Algorithm in Wireless Sensor Netwrok

    Science.gov (United States)

    Weipeng, Jing; Qu, Wu; Yaqiu, Liu; Qianlong, Zhang

    Fault-tolerance is one of important issues in wireless sensor network (WSN) since it is critical in real deployed environments to realize network stability and reduce demand times. In this paper, we propose primary-backup technique by creating a backup path for every sensor on a primary path of data transmission. Especially, we take high reliability path as selected primary or backup path method. The experimental results show that the algorithm not only has the low packet delivery ratio characters, but also ensures the reliability of topology paths and extends the network life-cycle efficiently.

  11. Beam intensity upgrade at Fermilab

    Energy Technology Data Exchange (ETDEWEB)

    Marchionni, A.; /Fermilab

    2006-07-01

    The performance of the Fermilab proton accelerator complex is reviewed. The coming into operation of the NuMI neutrino line and the implementation of slip-stacking to increase the anti-proton production rate has pushed the total beam intensity in the Main Injector up to {approx} 3 x 10{sup 13} protons/pulse. A maximum beam power of 270 kW has been delivered on the NuMI target during the first year of operation. A plan is in place to increase it to 350 kW, in parallel with the operation of the Collider program. As more machines of the Fermilab complex become available with the termination of the Collider operation, a set of upgrades are being planned to reach first 700 kW and then 1.2 MW by reducing the Main Injector cycle time and by implementing proton stacking.

  12. A right hemisphere safety backup at work: hypotheses for deep hypnosis, post-traumatic stress disorder, and dissociation identity disorder.

    Science.gov (United States)

    Burnand, Gordon

    2013-09-01

    Problem theory points to an a priori relation between six key problems of living, to which people have adapted through evolution. Children are guided through the problems one by one, learning to switch between them automatically and unawares. The first problem of raising hope of certainty (about the environment), is dealt with in the right hemisphere (RH). The second of raising hope of freedom (or power to control), is dealt with in the left hemisphere (LH). Here adventurousness and ignoring the goodness of outcomes potentially create recklessness. When uncertainty rises the RH activates a backup with an override that substitutes immobility, takes over sensory inputs, but allows obedience to parental commands, and a cut-out that stops new work on the freedom problem. Support for the use of the backup by infants is found in the immobility that precedes the crying in strange conditions, and in childhood EEGs. The hypothesis that the backup is active in deep hypnosis imposes accord on findings that appear contradictory. For example it accounts for why observations during deep hypnosis emphasize the activity of the RH, but observations of responsive people not under hypnosis emphasize the activity of the LH. The hypothesis that the backup is active in post-traumatic stress disorder (PTSD) is supported by (a) fMRI observations that could reflect the cut-out, in that part of the precuneus has low metabolism, (b) the recall of motionlessness at the time of the trauma, (c) an argument that playing dead as a defence against predators is illogical, (d) the ease of hypnosis. With dissociative identity disorder (DID), the theory is consistent with up to six alters that have executive control and one trauma identity state where childhood traumas are re-experienced. Support for the cut-out affecting the trauma identity state comes from suppression of part of the precuneus and other parts of the parietal lobe when the trauma identity state is salient and a general script about a

  13. BACKUP AND ULTIMATE HEAT SINKS IN CANDU REACTORS FOR PROLONGED SBO ACCIDENTS

    National Research Council Canada - National Science Library

    Nitheanandan, T; Brown, M.J

    2013-01-01

    .... The efficacy of available backup and ultimate heat sinks, available in a CANDU 6 reactor, in mitigating the consequences of a prolonged station blackout scenario was analysed using the MAAP4-CANDU code...

  14. STS-47 crew and backups at MSFC's Payload Crew Training Complex

    Science.gov (United States)

    1992-01-01

    STS-47 Endeavour, Orbiter Vehicle (OV) 105, Spacelab Japan (SLJ) crewmembers and backup payload specialists stand outside SLJ module mockup at the Payload Crew Training Complex at Marshall SpaceFlight Center (MSFC) in Huntsville, Alabama. From left to right are Payload Specialist Mamoru Mohri, backup Payload Specialist Takao Doi, backup Payload Specialist Chiaki Naito-Mukai, Mission Specialist (MS) Mae C. Jemison, MS N. Jan Davis, backup Payload Specialist Stan Koszelak, and MS and Payload Commander (PLC) Mark C. Lee. The MSFC-managed mission is a joint venture in space-based research between the United States and Japan. Mohri, Doi, and Mukai represent Japan's National Space Development Agency (NASDA). View provided with alternate number 92P-142.

  15. STS-47 crew and backups pose for portrait in SLJ module at KSC during training

    Science.gov (United States)

    1992-01-01

    STS-47 Endeavour, Orbiter Vehicle (OV) 105, crewmembers and backup payload specialists, wearing clean suits, pose for a group portrait in the Spacelab Japan (SLJ) module. The team is at the Kennedy Space Center's (KSC's) Orbiter Processing Facility (OPF) to inspect SLJ configuration and OV-105 preparations. Kneeling, from left, are backup Payload Specialist Chiaki Naito-Mukai; Mission Specialist (MS) N. Jan Davis; and backup Payload Specialist Takao Doi. Standing, from the left, are Pilot Curtis L. Brown,Jr; MS and Payload Commander Mark C. Lee; MS Jerome Apt; Payload Specialist Mamoru Mohri; Commander Robert L. Gibson; MS Mae C. Jemison; and backup Payload Specialist Stanely L. Koszelak. Mohri, Mukai, and Doi represent the National Space Development Agency of Japan (NASDA). View provided by KSC with alternate KSC number KSC-92PC-1647.

  16. Aligning component upgrades

    Directory of Open Access Journals (Sweden)

    Roberto Di Cosmo

    2011-08-01

    Full Text Available Modern software systems, like GNU/Linux distributions or Eclipse-based development environment, are often deployed by selecting components out of large component repositories. Maintaining such software systems by performing component upgrades is a complex task, and the users need to have an expressive preferences language at their disposal to specify the kind of upgrades they are interested in. Recent research has shown that it is possible to develop solvers that handle preferences expressed as a combination of a few basic criteria used in the MISC competition, ranging from the number of new components to the freshness of the final configuration. In this work we introduce a set of new criteria that allow the users to specify their preferences for solutions with components aligned to the same upstream sources, provide an efficient encoding and report on the experimental results that prove that optimising these alignment criteria is a tractable problem in practice.

  17. Gemini Instrument Upgrade Program

    Science.gov (United States)

    Diaz, Ruben; Goodsell, Stephen; Kleinman, Scot

    2016-08-01

    The Gemini Observatory* remains committed to keeping its operational instrumentation competitive and serving the needs of its user community. Currently the observatory operates a 4 instruments + 1 AO system at each site. At Gemini North the GMOS-N, GNIRS, NIFS and NIRI instruments are offered supported by the ALTAIR AO system. In the south, GMOS-S, F-2, GPI and GSAOI are offered instrumentation and GeMS is the provided AO System. This paper reviews our strategy to keep our instrumentation suite competitive, examines both our current funded upgrade projects and our potential future enhancements. We summarize the work done and the results so far obtained within the instrument upgrade program.

  18. Aligning component upgrades

    CERN Document Server

    Di Cosmo, Roberto; Michel, Claude; 10.4204/EPTCS.65.1

    2011-01-01

    Modern software systems, like GNU/Linux distributions or Eclipse-based development environment, are often deployed by selecting components out of large component repositories. Maintaining such software systems by performing component upgrades is a complex task, and the users need to have an expressive preferences language at their disposal to specify the kind of upgrades they are interested in. Recent research has shown that it is possible to develop solvers that handle preferences expressed as a combination of a few basic criteria used in the MISC competition, ranging from the number of new components to the freshness of the final configuration. In this work we introduce a set of new criteria that allow the users to specify their preferences for solutions with components aligned to the same upstream sources, provide an efficient encoding and report on the experimental results that prove that optimising these alignment criteria is a tractable problem in practice.

  19. [Loss of anesthesia records during network failure of anesthesia management information system: a case of malfunction of backup system].

    Science.gov (United States)

    Fujii, Seishi; Moriwaki, Katsuyuki; Sanuki, Mikako; Tajima, Minoru; Kurita, Shigeaki; Shiroyama, Kazuhisa; Hashimoto, Ken

    2014-05-01

    We report a case of an accidental loss of anesthesia records through network failure of an anesthesia information management system (AIMS). The backup data were not kept in the anesthesia workstations or the server during the failure. Accordingly, anesthesia records of five patients were lost for one hour. Our AIMS has a network redundancy where the server keeps anesthesia monitoring data via two pathways: one via the monitoring server to the AIMS server and the other via anesthesia workstation to the server. Despite the redundant pathways, transient power failures of network switches caused interruptions in both pathways. Our case indicates that, to improve the robustness of the AIMS as electronic medical records, every network apparatus of AIMS, should be supplied with an uninterrupted power supply. Furthermore, each anesthesia workstation should function independently as an anesthesia record keeping client when network failure occurs.

  20. CMS upgrades for SLHC

    CERN Document Server

    Palla, Fabrizio

    2006-01-01

    I will discuss the impact of the LHC luminosity upgrade on CMS detector. While most of the CMS can possibly cope with the increased luminosity, the Tracker must undergo a major redesign in technology both in terms of detector substrates as well as in the data transfer links. I will show the impact on CMS of reduced bunch length and machine elements close to the interaction point.

  1. The VELO Upgrade

    CERN Document Server

    Jans, Eddy

    2015-01-01

    A significant upgrade of the LHCb detector is scheduled to be installed in 2018-2019. Afterwards all sub-detectors will be read out at the LHC bunch crossing frequency of 40 MHz and the trigger will be fully implemented in software. The silicon strip vertex detector will be replaced by a hybrid pixel detector. In these proceedings the following items are discussed: frontend ASIC, data rates, data transmission, cooling, radiation hard sensors, module design and simulated performance.

  2. 26 CFR 48.4082-4 - Diesel fuel and kerosene; back-up tax.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Diesel fuel and kerosene; back-up tax. 48.4082-4..., and Taxable Fuel Taxable Fuel § 48.4082-4 Diesel fuel and kerosene; back-up tax. (a) Imposition of tax... fuel or kerosene on which tax has not been imposed by section 4081; (ii) Any diesel fuel or kerosene...

  3. 30 CFR 75.1101-9 - Back-up water system.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Back-up water system. 75.1101-9 Section 75.1101-9 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-9 Back-up water system. One fire hose outlet together with...

  4. ATLAS Upgrade Plans

    CERN Document Server

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000/fb by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new...

  5. The LHCb VELO Upgrade

    CERN Document Server

    de Capua, Stefano

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-3, will transform the experiment to a triggerless system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm, enabling the detector to run at luminosities of 2×1033 cm−2 s −1 . The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current strip detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will allow for fast pattern recognition and track reconstruction in the software trigger. The silicon pixel sensors have 55×55 µm2 pitch, and are read out by the VeloPix ASIC. The VeloPix builds on the currently available Timepix3, modified to deliver a radiation hard design capable of an order of magnitude increase in output rate. The hottest regions will have pixel hit rates of 900 Mhits/s, yielding a total data rate more than 3 Tbit/s for the upgraded VELO...

  6. LHCb VELO Upgrade

    CERN Document Server

    Hennessy, Karol

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of $2\\times10^{33} \\mathrm{cm}^{-2}\\mathrm{s}^{-1}$. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have $55\\times55 \\mu m^{2}$ pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separate...

  7. The LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Dosil Suárez, Álvaro, E-mail: alvaro.dosil@usc.es

    2016-07-11

    The upgrade of the LHCb experiment, planned for 2019, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm. The upgraded detector will run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1} and probe physics beyond the Standard Model in the heavy flavour sector with unprecedented precision. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The detector comprises silicon pixel sensors with 55×55 μm{sup 2} pitch, read out by the VeloPix ASIC, based on the TimePix/MediPix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The detector halves are retracted when the beams are injected and closed at stable beams, positioning the first sensitive pixel at 5.1 mm from the beams. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates.

  8. Solar dryer with thermal storage and biomass-backup heater

    Energy Technology Data Exchange (ETDEWEB)

    Madhlopa, A. [Department of Physics and Biochemical Sciences, Malawi Polytechnic, P/Bag 303, Blantyre 3 (Malawi); Ngwalo, G. [Department of Mechanical Engineering, Malawi Polytechnic, P/Bag 303, Blantyre 3 (Malawi)

    2007-04-15

    An indirect type natural convection solar dryer with integrated collector-storage solar and biomass-backup heaters has been designed, constructed and evaluated. The major components of the dryer are biomass burner (with a rectangular duct and flue gas chimney), collector-storage thermal mass and drying chamber (with a conventional solar chimney). The thermal mass was placed in the top part of the biomass burner enclosure. The dryer was fabricated using simple materials, tools and skills, and it was tested in three modes of operation (solar, biomass and solar-biomass) by drying twelve batches of fresh pineapple (Ananas comosus), with each batch weighing about 20 kg. Meteorological conditions were monitored during the dehydration process. Moisture and vitamin C contents were determined in both fresh and dried samples. Results show that the thermal mass was capable of storing part of the absorbed solar energy and heat from the burner. It was possible to dry a batch of pineapples using solar energy only on clear days. Drying proceeded successfully even under unfavorable weather conditions in the solar-biomass mode of operation. In this operational mode, the dryer reduced the moisture content of pineapple slices from about 669 to 11% (db) and yielded a nutritious dried product. The average values of the final-day moisture-pickup efficiency were 15%, 11% and 13% in the solar, biomass and solar-biomass modes of operation respectively. It appears that the solar dryer is suitable for preservation of pineapples and other fresh foods. Further improvements to the system design are suggested. (author)

  9. Optimized Heat Pipe Backup Cooling System Tested with a Stirling Convertor

    Science.gov (United States)

    Schwendeman, Carl L.; Tarau, Calin; Schifer, Nicholas A.; Anderson, William G.; Garner, Scott

    2016-01-01

    In a Stirling Radioisotope Power System (RPS), heat must be continuously removed from the General Purpose Heat Source (GPHS) modules to maintain the modules and surrounding insulation at acceptable temperatures. The Stirling convertor normally provides this cooling. If the Stirling convertor stops in the current system, the insulation is designed to spoil, preventing damage to the GPHS at the cost of an early termination of the mission. An alkali-metal variable conductance heat pipe (VCHP) can be used to passively allow multiple stops and restarts of the Stirling convertor by bypassing the heat during stops. In a previous NASA Small Business Innovation Research (SBIR) Program, Advanced Cooling Technologies, Inc. (ACT) developed a series of sodium VCHPs as backup cooling systems for the Stirling RPS. In 2012, one of these VCHPs was successfully tested at NASA Glenn Research Center with a Stirling convertor as an Advanced Stirling Radioisotope Generator (ASRG) backup cooling system. The prototype; however, was not optimized and did not reflect the final heat rejection path. ACT through further funding has developed a semioptimized prototype with the finalized heat path for testing at Glenn with a Stirling convertor. The semioptimized system features a two-phase radiator and is significantly smaller and lighter than the prior prototype to reflect a higher level of flight readiness. The VCHP is designed to activate and remove heat from the GPHS during stoppage with a small temperature increase from the nominal vapor temperature. This small temperature increase from nominal is low enough to avoid risking standard ASRG operation and spoiling of the multilayer insulation (MLI). The VCHP passively allows the Stirling convertor to be turned off multiple times during a mission with potentially unlimited off durations. Having the ability to turn the Stirling off allows for the Stirling to be reset and reduces vibrations on the platform during sensitive measurements or

  10. Solution to Upgrade the Existing Power System Network Security Defense System%提升电力系统现有网络安全防御体系的解决方案

    Institute of Scientific and Technical Information of China (English)

    李永康; 周军鹏; 陈云峰

    2011-01-01

    Analyzed technologies of the existing power system network security defense,it shows the current security and defense technology can solve the vast majority of known malicious code attacks,but it is in a state of passive defense,which can not recognize the new and unknown malicious code,it proposed to upgrade the existing security defense system for the active defense system,to achieve the solution of differentiation and defense in depth.%对电力系统现有的网络安全防御技术进行了分析,得出当前的安全防御技术虽能够解决绝大部分已知的恶意代码攻击,但却处于对新型的和未知的恶意代码攻击无法识别的被动防御的状态,并提出将现有的安全防御体系提升为主动防御体系,实现差异化、纵深防御的解决方案。

  11. Kongiganak Wind Turbine Replacement and System Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Boonstra, Patrick [Intelligent Energy Systems, Anchorage, AK (United States)

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  12. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Lingemann, Joschka; Sakulin, Hannes; Jeitler, Manfred; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run 2 of the Large Hadron Collider pose new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run 1, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new microTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (GMT) which combines information from the muon trigger sub-systems and assigns the isolation variable. The upgraded GMT will be implemented using a Master Processor 7 card, built by Imperial College, that features a large Xilinx Virtex 7 FPGA. Up to 72 optical links at...

  13. Design and performance of serial powered single-sided modules within an integrated stave assembly for the ATLAS tracker barrel upgrade

    CERN Document Server

    Affolder, A; Greenall , A; Wormald, M; 10.1088/1748-0221/5/12/C12013

    2010-01-01

    The design and performance of prototype single-sided modules with ABCN-25 front-end chips and 10x10 cm2 Hamamatsu silicon strip sensors is presented. A low mass module assembly has been achieved by gluing a single-sided flex circuit, with read out chips, directly onto the sensor. The design exploits the embedded shunt regulation within the ABCN-25 providing for a distributed and scalable powered architecture. This allows for multiple modules to be linked together serially to form larger stave structures of up to 12 modules. The stave's digital I/O is realised as a multi-drop LVDS bus flex cable glued to the stave core assembly using a custom receiver/transmitter ASIC (BCC). The results of preliminary electrical tests with 4 module stavelets will be presented

  14. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators.

  15. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators.

  16. PREDICTION BACKUP TESTICULAR FUNCTION IN PATIENTS WITH NONOBSTRUCTIVE AZOOSPERMIA

    Directory of Open Access Journals (Sweden)

    N. G. Kul’chenko

    2016-01-01

    Full Text Available Modern authors believe that male infertility accounts for 40–50%. The most severe form of male infertility is azoospermia, which is observed in 10–15% of cases. The only method of diagnosis of azoospermia is testicular biopsy, which allows not only to differentiate the secretory and excretory forms of infertility, but also to determine the degree of impairment of spermatogenesis.Purpose. To improve the diagnosis of male infertility.Materials and methods. We have examined 26 men with non-obstructive azoospermia (according to semen. The comparison group included healthy men – 22 people. Patients underwent biopsy of the testicle, followed by morphological analysis of biopsies. Sections of testicular tissue was stained with hematoxylin and eosin, indirect immunohistochemical studies – definition of Inhibin B, a protein prolife ration and apoptosis (ki-67Results. According to clinical and instrumental examination (ultrasound we found no abnormalities. Patients set idiopathic form of infertility. When painting testice slices with hematoxylin and eosin, we recorded significant changes in the convoluted seminiferous tubules in patients with azoospermia: the diameter is reduced to 1.5–2 times (hypoplasia, the basement membrane with a strong fiber component (fibrosis (p < 0,05. Expressed Inhibin tissue expression observed in Sertoli cells (“+++” and to a lesser extent in spermatogonia ( «±», located closer to the basal membrane convoluted seminiferous tubule. The expression level of Inhibin in germ cells - up to 5%. ki-67 protein expression was observed in the nuclei (S-phase of mitosis spermatogonia (“++” at stages II and III and spermatogenesis in some primary nuclei (“+” and secondary (“+” spermatocytes. Expression of ki-67 level in the germ cells – up to 25%.Conclusion. Determination of tissue levels of Inhibin-B can be used as a p rognostic test backup testicular function.

  17. 核电站仪控全数字化改造项目规划和策略%Planning and Strategy of I & C Systems Upgrade Project in Nuclear Power Plant

    Institute of Scientific and Technical Information of China (English)

    蔡俊东

    2015-01-01

    Existing I&C systems for nuclear power plants designed and built in accordance with technologies in the 1 980s in China,is based either on relays or on analog components etc.Much is approaching or has exceeded its original life expectancy.The nuclear power plants have been faced with problems regarding obsolescence, burden on maintenance and testing activities, inaccuracy, and unreliability.In addition,it has been difficult to adopt new technologies to improve plant availability.So the power plant has decided to upgrade the existing I&C systems as one of the most significant parts of a larger scale modernization project.In this paper,by analyzing the necessity and complexity of the I&C systems upgrade and learning from foreign experience,we proposed some feasible methods and suggestions in terms of the project planning and technical preparation from a manufacture management point of view.The purpose is to improve the risk control in the process of project implementation,and strengthen the quality control in the design and implementation phase of the project,and ensure the safe and stable operation of the unit within the lifetime.%国内早期核电机组仪控系统主要采用80年代的主流设计,以模拟仪表和继电器控制回路为主。这些设备的设计寿命至少已超过20年,硬件的老化,人员知识结构的老化和电站对机组安全性、可靠性和操作/维护需求的提高,促使电站管理者将仪控数字化改造作为电站整体战略的一部分。通过分析核电站仪控系统改造的必要性和复杂性,借鉴国内外核电站改造项目经验,从电站生产和维修管理角度,对核电站全数字化改造的项目规划和技术准备提出可行的方法和意见。从需求角度加强电站主体对项目设计和实施过程的质量管理,强化改造项目的闭环控制,以提高改造项目在生产和维修活动中的风险控制,确保机组寿期内能安全稳定运行。

  18. Upgrading Enterprise Search

    Energy Technology Data Exchange (ETDEWEB)

    McDunn, R

    2005-04-28

    This presentation will describe the process we went through this past year to upgrade our enterprise search tool from a very old version of Inktomi to the latest version of Verity Ultraseek. We started with requirements gathering and then compared requirements against several available products to determine which product to choose. After purchasing the product, we worked through several defined phases of implementation and customization, with initial rollout late January 2004. Finally, we will show you where we are today and describe future search plans.

  19. Repairing and Upgrading Your PC

    CERN Document Server

    Thompson, Robert

    2009-01-01

    Repairing and Upgrading Your PC delivers start-to-finish instructions, simple enough for even the most inexperienced PC owner, for troubleshooting, repairing, and upgrading your computer. Written by hardware experts Robert Bruce Thompson and Barbara Fritchman Thompson, this book covers it all: how to troubleshoot a troublesome PC, how to identify which components make sense for an upgrade, and how to tear it all down and put it back together. This book shows how to repair and upgrade all of your PC's essential components.

  20. ATLAS Detector Upgrade Prospects

    Science.gov (United States)

    Dobre, M.; ATLAS Collaboration

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC was ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015 and 2016. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, which will deliver of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb ‑1 expected for LHC running by the end of 2018 to 3000 fb ‑1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extensions to larger pseudorapidity, particularly in tracking and muon systems. This report summarizes various improvements to the ATLAS detector required to cope with the anticipated evolution of the LHC luminosity during this decade and the next. A brief overview is also given on physics prospects with a pp centre-of-mass energy of 14 TeV.

  1. ATLAS Detector Upgrade Prospects

    CERN Document Server

    Dobre, Monica; The ATLAS collaboration

    2016-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC is ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred f b −1 expected for LHC running to 3000 f b −1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of ext...

  2. LHCb VELO Upgrade

    CERN Multimedia

    van Beuzekom, Martin; Ketel, Tjeerd; Gershon, Timothy; Parkes, Christopher; Reid, Matthew

    2011-01-01

    The VErtex LOcator (VELO) is a vital piece of apparatus for allowing precision measurements in hadronic physics. It provides not only superb impact parameter resolutions but also excellent momentum resolution, both important discriminating tools for precision high energy physics. This poster focuses on the R&D going into the future LHCb VELO detector. At present there are two proposed options for the upgrade; pixel chips or strip detectors. The LHCb upgrade is designed with higher luminosities and increased yields in mind. In order to get more out of the LHCb detector changes to the front end electronics will have to be made. At present, the first level hardware trigger is sets a limiting factor on the maximum efficiency for hadronic channels. As the VELO is positioned so close the proton-proton interaction region, whatever the choice of sensor, we will require efficient cooling and some proposed solutions are outlined. The LHCb TimePix telescope has had a very successful years running, with various devic...

  3. ATLAS Detector Upgrade Prospects

    CERN Document Server

    Dobre, Monica; The ATLAS collaboration

    2016-01-01

    After the successful operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, the LHC is ramped up and successfully took data at the center-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The ultimate goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extens...

  4. Empirical Analysis of High Efficient Remote Cloud Data Center Backup Using HBase and Cassandra

    Directory of Open Access Journals (Sweden)

    Bao Rong Chang

    2015-01-01

    Full Text Available HBase, a master-slave framework, and Cassandra, a peer-to-peer (P2P framework, are the two most commonly used large-scale distributed NoSQL databases, especially applicable to the cloud computing with high flexibility and scalability and the ease of big data processing. Regarding storage structure, different structure adopts distinct backup strategy to reduce the risks of data loss. This paper aims to realize high efficient remote cloud data center backup using HBase and Cassandra, and in order to verify the high efficiency backup they have applied Thrift Java for cloud data center to take a stress test by performing strictly data read/write and remote database backup in the large amounts of data. Finally, in terms of the effectiveness-cost evaluation to assess the remote datacenter backup, a cost-performance ratio has been evaluated for several benchmark databases and the proposed ones. As a result, the proposed HBase approach outperforms the other databases.

  5. Computer codes used during upgrading activities at MINT TRIGA reactor

    Energy Technology Data Exchange (ETDEWEB)

    Mohammad Suhaimi Kassim; Adnan Bokhari; Mohd. Idris Taib [Malaysian Institute for Nuclear Technology Research, Kajang (Malaysia)

    1999-10-01

    MINT TRIGA Reactor is a 1-MW swimming pool nuclear research reactor commissioned in 1982. In 1993, a project was initiated to upgrade the thermal power to 2 MW. The IAEA assistance was sought to assist the various activities relevant to an upgrading exercise. For neutronics calculations, the IAEA has provided expert assistance to introduce the WIMS code, TRIGAP, and EXTERMINATOR2. For thermal-hydraulics calculations, PARET and RELAP5 were introduced. Shielding codes include ANISN and MERCURE. However, in the middle of 1997, MINT has decided to change the scope of the project to safety upgrading of the MINT Reactor. This paper describes some of the activities carried out during the upgrading process. (author)

  6. Upgrade trigger: Biannual performance update

    CERN Document Server

    Aaij, Roel; Couturier, Ben; Esen, Sevda; De Cian, Michel; De Vries, Jacco Andreas; Dziurda, Agnieszka; Fitzpatrick, Conor; Fontana, Marianna; Grillo, Lucia; Hasse, Christoph; Jones, Christopher Rob; Le Gac, Renaud; Matev, Rosen; Neufeld, Niko; Nikodem, Thomas; Polci, Francesco; Del Buono, Luigi; Quagliani, Renato; Schwemmer, Rainer; Seyfert, Paul; Stahl, Sascha; Szumlak, Tomasz; Vesterinen, Mika Anton; Wanczyk, Joanna; Williams, Mark Richard James; Yin, Hang; Zacharjasz, Emilia Anna

    2017-01-01

    This document presents the performance of the LHCb Upgrade trigger reconstruction sequence, incorporating changes to the underlying reconstruction algorithms and detector description since the Trigger and Online Upgrade TDR. An updated extrapolation is presented using the most recent example of an Event Filter Farm node.

  7. 12 GeV Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-01-01

    To expand the opportunity for discovery, Jefferson Lab is upgrading its facility by doubling the maximum energy of CEBAF's electron beam from 6 billion electron volts (GeV) to 12 billion electron volts (GeV), constructing a new experimental hall and upgrading its three existing experimental halls.

  8. Slum Upgrading and Health Equity.

    Science.gov (United States)

    Corburn, Jason; Sverdlik, Alice

    2017-03-24

    Informal settlement upgrading is widely recognized for enhancing shelter and promoting economic development, yet its potential to improve health equity is usually overlooked. Almost one in seven people on the planet are expected to reside in urban informal settlements, or slums, by 2030. Slum upgrading is the process of delivering place-based environmental and social improvements to the urban poor, including land tenure, housing, infrastructure, employment, health services and political and social inclusion. The processes and products of slum upgrading can address multiple environmental determinants of health. This paper reviewed urban slum upgrading evaluations from cities across Asia, Africa and Latin America and found that few captured the multiple health benefits of upgrading. With the Sustainable Development Goals (SDGs) focused on improving well-being for billions of city-dwellers, slum upgrading should be viewed as a key strategy to promote health, equitable development and reduce climate change vulnerabilities. We conclude with suggestions for how slum upgrading might more explicitly capture its health benefits, such as through the use of health impact assessment (HIA) and adopting an urban health in all policies (HiAP) framework. Urban slum upgrading must be more explicitly designed, implemented and evaluated to capture its multiple global environmental health benefits.

  9. Structural seismic upgrading of NPPs in Czech and Slovak republics

    Energy Technology Data Exchange (ETDEWEB)

    David, M. [DAVID Consulting, Engineering and Design Office, Prague (Czech Republic)

    1997-03-01

    Several Nuclear Power Plants of the VVER type has been constructed during the past years in former Czechoslovak Republic. Some of them has been already put in operation and some of them are under construction. Nuclear Power Plants V1(2 units of VVER 440/230), V2(2 units of VVER 440/213) in Slovak and NPP Dukovany (4 units of VVER 440/213) in Czech republic are in operation. NPP Mochovce (4 units of VVER 440/213) in Slovak and NPP Temelin (4 units reduced now to 2 units VVER 1000) have been already almost completed, but still under construction. All above cited NPPs have not been either explicitly designed against earthquake or the design against earthquake or its input data must be upgraded to be compatible with present requirements. The upgrading of seismic input as well the seismic upgrading of all structures and technological equipments for so many NPPs has involved a lot of comprehensive work in Czech as well as in Slovak republics. The upgrading cannot be completed in a short time and as a rule the seismic upgrading has been usually performed in several steps, beginning with the most important arrangements against seismic hazard. The basic principles and requirements for seismic upgrading has been defined in accordance with the international and particularly with the IAEA recommendations. About the requirements for seismic upgrading of NPPs in Czech and Slovak republics will be reported in other contribution. This contribution is dealing with the problems of seismic upgrading of NNPs civil engineering structures. The aim of this contribution is to point out some specific problems connected firstly with very complicated concept of Versa structures and secondly with the difficult task to increase the structural capacity to the required seismic level. (J.P.N.)

  10. Dynamic Scheduling Real-Time Task Using Primary-Backup Overloading Strategy for Multiprocessor Systems

    Science.gov (United States)

    Sun, Wei; Yu, Chen; Défago, Xavier; Inoguchi, Yasushi

    The scheduling of real-time tasks with fault-tolerant requirements has been an important problem in multiprocessor systems. The primary-backup (PB) approach is often used as a fault-tolerant technique to guarantee the deadlines of tasks despite the presence of faults. In this paper we propose a dynamic PB-based task scheduling approach, wherein an allocation parameter is used to search the available time slots for a newly arriving task, and the previously scheduled tasks can be re-scheduled when there is no available time slot for the newly arriving task. In order to improve the schedulability we also propose an overloading strategy for PB-overloading and Backup-backup (BB) overloading. Our proposed task scheduling algorithm is compared with some existing scheduling algorithms in the literature through simulation studies. The results have shown that the task rejection ratio of our real-time task scheduling algorithm is almost 50% lower than the compared algorithms.

  11. Upstream, downstream underground upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Roche, P.

    2008-06-15

    Innovation, technology and research and development activities in the upstream oil sands industry were discussed with particular reference to new methods of upgrading bitumen in reservoirs currently being used by Shell Canada. Methods of refining residues and producing tight gas and oil sands were also discussed. Shell Canada's pilot program is currently being conducted to test the electric heat technology at a cyclic steam project that is currently preparing for significant growth. The pilot project will assess the composition of the product, determine recovery efficiency and identify geomechanical issues in order to commercialize the heaters. The project will potentially produce billions of barrels of light oil if it succeeds. It was concluded that Shell is now also using its proprietary gas-to-liquids (GTL) technology to build the world's first GTL plant in Malaysia. 3 figs.

  12. AliPDU Upgrade

    CERN Document Server

    Mhlanga, Sibaliso

    2014-01-01

    A power distribution unit (PDU) is a device used in data centres to distribute AC power to multiple servers and other equipment. Power distribution units (PDUs) can be managed remotely via the Web browser or other management console, causing outlets to be turned on and off at prescribed times and in a proper sequence for shutting down and powering up equipment. The task in this project was to create as many PDUs on one click and customize them.

  13. SysProp: A Web-based Data Backup, Synchronization and System Administration

    Directory of Open Access Journals (Sweden)

    Salekul Islam

    2014-08-01

    Full Text Available From the inception of computer based computing, preventing data loss or data corruption is considered as one of the difficult challenges. In early days, data reliability had been increased by replicating data in multiple disks, which were attached with the same system and later located inside the same network. Later, to avoid potential risk of single point of failure, the replicated data storage has been separated from the network from which the data has been originated. Thus, following the concept of peer-to-peer (P2P networking, P2P storage system has been designed, where data has been replicated inside multiple remote peers’ redundant storages. With the advent of Cloud computing, a similar but more reliable Cloud-based storage system has been developed. Note that Cloud storages are expensive for small and medium enterprises. Moreover, users are often reluctant to store their sensitive data inside a third-party’s network that they do now own or control. In this paper, we design, develop and deploy a storage system that we named SysProp. Two widely used tools—Web applications and UNIX daemon—have been incorporated in the development process of SysProp. Our goal is to congregate benefits of different storage systems (e.g., networked, P2P and Cloud storages in a single application. SysProp provides a remotely accessible, Web-based interface, where users have full control over their data and data is being transferred in encrypted form. Moreover, for data backup, a powerful UNIX tool, rsync has been used that synchronize data by transferring only the updated portion. Finally, SysProp is a successful demonstration of the concept that UNIX daemons can be remotely executed and controlled over the Web. Hence, this concept might be exploited to build many system administrative applications.

  14. Back-up strategies in drug discovery: what, how and when?

    Science.gov (United States)

    Provins, Laurent; Jnoff, Eric; Genicot, Christophe

    2014-11-01

    The management of back-up strategies in drug discovery and development is usually done on an ad hoc basis depending upon a series of external factors including overall portfolio status and resource and/or budget availability. These are however an essential component of risk management and merit a more structured and systematic conduct throughout the lifetime of a project. An approach based upon a thorough alignment of decision points and data availability as well as a tailor-made progression of various types of back-up program as a function of project categorization is suggested.

  15. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Jeitler, Manfred; Rabady, Dinyar; Sakulin, Hannes; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run-II of the Large Hadron Collider poses new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run-I, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new μTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (μGMT) which sorts and removes duplicates from boundaries of the muon trigger sub-systems. Furthermore, it determines how isolated the muon candidates are based on calorimetric energy deposits. The μGMT will be implemented using a processing board that features a larg...

  16. Upgrade of the CMS hadron calorimeter for an upgraded LHC

    Science.gov (United States)

    Anderson, Jacob; CMS Hcal Collaboration

    2012-12-01

    The CMS barrel and endcap hadron calorimeters (Hcal) upgrading the current photo-sensors are hybrid photodiodes (HPDs) to meet the demands of the upgraded luminosity of the LHC. A key aspect of the Hcal upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at L1 trigger. The increased segmentation can be achieved by replacing the HPD's with multi-pixel Geiger-mode avalanche photodiodes. The upgraded electronics are required to operate in a harsh environment and are constrained by the existing infrastructure. The proposed solutions span from chip level to system level. They include the development of a new ADC ASIC, the design and testing of higher speed transmitters to handle the increased data volume, the evaluation and use of circuits from other developments, evaluation of commercial FPGAs, better thermal design and improvements in the overall architecture.

  17. The challenge of localizing vehicle backup alarms: Effects of passive and electronic hearing protectors, ambient noise level, and backup alarm spectral content

    Directory of Open Access Journals (Sweden)

    Khaled A Alali

    2011-01-01

    Full Text Available A human factors experiment employed a hemi-anechoic sound field in which listeners were required to localize a vehicular backup alarm warning signal (both a standard and a frequency-augmented alarm in 360-degrees azimuth in pink noise of 60 dBA and 90 dBA. Measures of localization performance included: (1 percentage correct localization, (2 percentage of right--left localization errors, (3 percentage of front-rear localization errors, and (4 localization absolute deviation in degrees from the alarm′s actual location. In summary, the data demonstrated that, with some exceptions, normal hearing listeners′ ability to localize the backup alarm in 360-degrees azimuth did not improve when wearing augmented hearing protectors (including dichotic sound transmission earmuffs, flat attenuation earplugs, and level-dependent earplugs as compared to when wearing conventional passive earmuffs or earplugs of the foam or flanged types. Exceptions were that in the 90 dBA pink noise, the flat attenuation earplug yielded significantly better accuracy than the polyurethane foam earplug and both the dichotic and the custom-made diotic electronic sound transmission earmuffs. However, the flat attenuation earplug showed no benefit over the standard pre-molded earplug, the arc earplug, and the passive earmuff. Confusions of front-rear alarm directions were most significant in the 90 dBA noise condition, wherein two types of triple-flanged earplugs exhibited significantly fewer front-rear confusions than either of the electronic muffs. On all measures, the diotic sound transmission earmuff resulted in the poorest localization of any of the protectors due to the fact that its single-microphone design did not enable interaural cues to be heard. Localization was consistently more degraded in the 90 dBA pink noise as compared with the relatively quiet condition of the 60 dBA pink noise. A frequency-augmented backup alarm, which incorporated 400 Hz and 4000 Hz components

  18. The RHIC polarized source upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Zelenski, A.; Atoian, G.; Davydenko, V.; Ivanov, A.; Kolmogorov, A.; Ritter, J.; Steski, D.; Zubets, V.

    2010-09-27

    The RHIC polarized H{sup -} ion source is being upgraded to higher intensity (5-10 mA) and polarization for use in the RHIC polarization physics program at enhanced luminosity RHIC operation. The higher beam peak intensity will allow reduction of the transverse beam emittance at injection to AGS to reduce polarization losses in AGS. There is also a planned RHIC luminosity upgrade by using the electron beam lens to compensate the beam-beam interaction at collision points. This upgrade is also essential for future BNL plans for a high-luminosity electron - proton (ion) Collider eRHIC.

  19. Thermal and Electrodynamic Risk of Residual Current Devices in the Case of Back-Up Protection by Overcurrent Circuit Breakers

    Directory of Open Access Journals (Sweden)

    Stanisław Czapp

    2014-12-01

    Full Text Available Residual current operated circuit breakers without integral overcurrent protection should be back-up protected. As back-up protection devices, overcurrent circuit breakers are used. The maximum let-through energy and let-through current of the overcurrent devices were evaluated under laboratory conditions. The thermal and electrodynamic risk of residual current devices was analyzed.

  20. Upgrade of the area II spectrograph

    Energy Technology Data Exchange (ETDEWEB)

    Rehm, K.E.; Bolduc, C.

    1995-08-01

    Because of the low beam energies required for experiments of astrophysical interest, the first test experiments with radioactive {sup 18}F beams can be performed in Area II. Because of the shorter distances between ion source and detector this also results in higher transmission efficiencies. The Enge split-pole spectrograph, which was not used during the last 8 years, was equipped with a new cryopump system, upgrades to the magnet power supply and the NMR system were performed. A rotating target system was built which should alleviate target deterioration effects that were observed in first test experiments.

  1. The LHCb Upgrade

    CERN Document Server

    Gallas, A

    2012-01-01

    The LHCb experiment is designed to perform high-precision measurements of CP violation and search for New Physics using the enormous flux of beauty and charmed hadrons produced at the LHC. The LHCb detector is a single-arm spectrometer with excellent tracking and particle identification capabilities. The operation and the results obtained from the data collected in 2010 and 2011 demonstrate that the detector is robust and functioning very well. In the next years, LHCb will measure a large number of interesting channels in heavy flavor decays. However, the limit of 1 fb−1 of data per year cannot be overcome without improving the detector. An upgraded spectrometer with a 40MHz readout and a much more flexible software-based triggering system will increase the data rate as well as the efficiency specially in the hadronic channels, widening our physics scope beyond that of heavy flavor. Here, the different possibilities under study for the different detectors are reviewed as well as the ongoing R&D activiti...

  2. ATLAS Future Upgrade

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00225024; The ATLAS collaboration

    2016-01-01

    After the successful operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, the LHC is ramped up and successfully took data at the center-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The ultimate goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Along with maintenance and consolidation of the detector in the past few years, ATLAS has added inner b-layer to its tracking system. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requir...

  3. Development of Sequential Calculating Type Autonomous Stabilizing Controller for Maintaining Transient Stability in case of Backup Relay Operation in Load System

    Science.gov (United States)

    Kobayashi, Ryoji; Maekawa, Kazuo; Shimomura, Kimihiko; Sasaki, Takashi; Kowada, Yasuyuki; Maeda, Toru

    A new Autonomous Stabilizing Controller (ASC) has been developed, which is based on the concept of using only locall information measured at the substation where ASC is installed. ASC prevents the power system from wide-area blackout by shedding generators optimally when a serious fault occurs in 154kV-or-below-voltage power system and is cleared by backup relay. ASC consists of three functions, a function of detecting faults and judging of starting stability calculations (The first function), a function of calculating power system stability (The second function), and a function of selecting optimal generators to be shed (The third function). The first function composes a signal for starting stability calculations when a fault cleared by backup relay is detected. According to the starting signal composed by the first function, the second function executes stability calculations based on equal area criterion. If the result of stability calculations is instable, the third function selects a generator to be shed by considering not only the stabilizing effect but also the quickly restoration after shedding. This paper presents total algorithms applied in ASC.

  4. An efficient hybrid protection scheme with shared/dedicated backup paths on elastic optical networks

    Directory of Open Access Journals (Sweden)

    Nogbou G. Anoh

    2017-02-01

    Full Text Available Fast recovery and minimum utilization of resources are the two main criteria for determining the protection scheme quality. We address the problem of providing a hybrid protection approach on elastic optical networks under contiguity and continuity of available spectrum constraints. Two main hypotheses are used in this paper for backup paths computation. In the first case, it is assumed that backup paths resources are dedicated. In the second case, the assumption is that backup paths resources are available shared resources. The objective of the study is to minimize spectrum utilization to reduce blocking probability on a network. For this purpose, an efficient survivable Hybrid Protection Lightpath (HybPL algorithm is proposed for providing shared or dedicated backup path protection based on the efficient energy calculation and resource availability. Traditional First-Fit and Best-Fit schemes are employed to search and assign the available spectrum resources. The simulation results show that HybPL presents better performance in terms of blocking probability, compared with the Minimum Resources Utilization Dedicated Protection (MRU-DP algorithm which offers better performance than the Dedicated Protection (DP algorithm.

  5. Backup Sourcing Decisions for Coping with Supply Disruptions under Long-Term Horizons

    Directory of Open Access Journals (Sweden)

    Jing Hou

    2016-01-01

    Full Text Available This paper studies a buyer’s inventory control problem under a long-term horizon. The buyer has one major supplier that is prone to disruption risks and one backup supplier with higher wholesale price. Two kinds of sourcing methods are available for the buyer: single sourcing with/without contingent supply and dual sourcing. In contingent sourcing, the backup supplier is capacitated and/or has yield uncertainty, whereas in dual sourcing the backup supplier has an incentive to offer output flexibility during disrupted periods. The buyer’s expected cost functions and the optimal base-stock levels using each sourcing method under long-term horizon are obtained, respectively. The effects of three risk parameters, disruption probability, contingent capacity or uncertainty, and backup flexibility, are examined using comparative studies and numerical computations. Four sourcing methods, namely, single sourcing with contingent supply, dual sourcing, and single sourcing from either of the two suppliers, are also compared. These findings can be used as a valuable guideline for companies to select an appropriate sourcing strategy under supply disruption risks.

  6. 26 CFR 31.3406(a)-2 - Definition of payors obligated to backup withhold.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 15 2010-04-01 2010-04-01 false Definition of payors obligated to backup... COLLECTION OF INCOME TAX AT SOURCE Collection of Income Tax at Source § 31.3406(a)-2 Definition of payors... trust fund; and (4) A partnership or an S corporation that makes a reportable payment. (c) Persons not...

  7. Backup roll contour of a SmartCrown tandem cold rolling mill

    Institute of Scientific and Technical Information of China (English)

    Guanghui Yang; Jianguo Cao; Jie Zhang; Shenghui Jia; Renwei Tan

    2008-01-01

    SmartCrown was a new system developed by VAI for improving the strip profile and flatness control first applied in 1700mm tandem cold rolling mills at Wuhan Iron & Steel (Group) Corporation (WISCO). After tracing and testing, the application of the conventional crown backup roll matching the SmartCrown work roll of the production mill led to heavy and nonuniform wear, and the edge spalling of the backup roll often occurred. A 3-dimension finite element model of roll stacks was established, which was used to analyze the above-mentioned problems, and it was found that the main reason was the highly nonuniform contact pressure distribution between the work roll and the backup roll. A new FSR (flexible shape backup roll) was developed and applied in 1700mm tandem cold rolling mills. A lot of good actual effects of FSR, such as evident improvement in profile and flatness of strips,non-occurring edge spalling, wear uniform, and remarkable decrease in roll consumption were validated by long-term industrial applications.

  8. A DRIVEN BACKUP ROUTING TABLE TO FIND ALTERNATIVE DISJOINT PATH IN AD HOC WIRELESS

    Directory of Open Access Journals (Sweden)

    Radwan S. Abujassar

    2011-08-01

    Full Text Available The performances of the routing protocols are important since they compute the primary path betweensource and destination. In addition, routing protocols need to detect failure within a short period oftime when nodes move to start updating the routing table in order to find a new primary path tothe destination. Meantime, loss of packets and end-to- end delays will increase thereby reducingthroughput and degrading the performance of the network. This paper proposes a new algorithm,DBRT (Driven Backup Routing Table, to improve the existing proactive protocols such as DSDV(Destination Sequenced Distance Vector protocol by creating a backup routing table to providemultiple alternative routes. The DBRT algorithm identifies adjacent nodes for each node in the samerange and then selects one of these as a backup next hop according to the available path to thedestination. The results show that loss of data packets, throughput and end-to-end delay times betweensource and destination are improved. The results show that the new protocol does not degrade thenetwork’s performance despite sending extra messages to construct and update the new backuprouting table. Simulations (using an NS2 simulator are undertaken to demonstrate the differencebetween using a DSDV protocol with or without the proposed schema.Index Terms; Network Protocols ;( DSDV Destination Sequenced Distance Vector ; DBRT (Driven BackupRouting Table;Wireless Network; Mobile Ad Hoc Network

  9. Backup and Recovery of ORACLE Database%ORACLE数据库备份及恢复

    Institute of Scientific and Technical Information of China (English)

    王学海

    2012-01-01

    This paper introduces the backup and recovery process of ORACLE database, and puts forward the breakpoint recovery and operation method of ORACLE database.%本文介绍了ORACLE数据库的备份和恢复过程,给出了医院系统ORACLE数据库的断点恢复及操作方法.

  10. Influence of unbalance levels on nonlinear dynamics of a rotor-backup rolling bearing system

    DEFF Research Database (Denmark)

    Fonseca, Cesar A.; Santos, Ilmar; Weber, Hans I.

    2017-01-01

    Rotor drops in magnetic bearing and unbalance in rotors have been objective of study for many years. The combination of these two well-known phenomena led to an interesting chaotic response, when the rotor touches the inner race of the back-up bearing. The present work explores the nonlinear roto...

  11. Training Backup Searchers...or How "Reluctant Ralph" Deals with "Terrified Tess."

    Science.gov (United States)

    Crampon, Jean E.

    1980-01-01

    Identifies several common attitudes of institutions, trainees, and trainers regarding the training of a backup searcher. Ten tips are given for dealing with the less-than-perfect training situation, with recommendations (depending on the combination of attitudes) for internal or external training, or both. (SW)

  12. Upgrade of the MAGIC telescopes

    CERN Document Server

    Mazin, Daniel; Garczarczyk, Markus; Giavitto, Gianluca; Sitarek, Julian

    2014-01-01

    The MAGIC telescopes are two Imaging Atmospheric Cherenkov Telescopes (IACTs) located on the Canary island of La Palma. With 17m diameter mirror dishes and ultra-fast electronics, they provide an energy threshold as low as 50 GeV for observations at low zenith angles. The first MAGIC telescope was taken in operation in 2004 whereas the second one joined in 2009. In 2011 we started a major upgrade program to improve and to unify the stereoscopic system of the two similar but at that time different telescopes. Here we report on the upgrade of the readout electronics and digital trigger of the two telescopes, the upgrade of the camera of the MAGIC I telescope as well as the commissioning of the system after this major upgrade.

  13. Thermal performance of back-up current-limiting fuses

    Energy Technology Data Exchange (ETDEWEB)

    Torres, E.; Mazon, A.J.; Fernandez, E.; Zamora, I. [Department of Electrical Engineering, University of the Basque Country (UPV/EHU), Alameda de Urquijo, s/n, Bilbao 48013, Bizkaia (Spain); Perez, J.C. [MESA - Schneider Electric, Gatica 48110 (Spain)

    2010-12-15

    The design and development of current-limiting power fuses requires considerable time and expense on testing to verify that the maximum temperature limits under the rated current established in international standards are not exceeded. This paper presents a new methodology that reproduces the thermal behaviour of high voltage current-limiting fuses under currents up to the rated value and so, it reduces the need for testing as prototypes, more similar to the final design, can be obtained. Firstly, the methodology solves the transient heating process of the fuse to obtain the values of the power dissipated and the heat transfer coefficient, corresponding to the steady state condition. Once these values have been calculated, the temperature distribution at the surface of the complete fuse is obtained. The validity of the method proposed has been verified by comparison of the numerical values calculated with those obtained by testing real fuses. (author)

  14. D0 Upgrade for RUN II

    CERN Document Server

    Petroff, P

    1999-01-01

    The D0 detector at The Fermilab Tevatron is undergoing a major upgrade to prepare for data taking with luminosities reaching 2 x 10^{32} cm^{-2} s^{-1}. The upgrade includes a new central tracking array, new muon detector components and electronic upgrades to many subsystems. The D0 upgraded detector will be operational for RUN II in spring 2000.

  15. User and Performance Impacts from Franklin Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    He, Yun (Helen)

    2009-05-10

    The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.

  16. Prototype readout electronics for the upgraded ALICE Inner Tracking System

    Science.gov (United States)

    Sielewicz, K. M.; Aglieri Rinella, G.; Bonora, M.; Ferencei, J.; Giubilato, P.; Rossewij, M. J.; Schambach, J.; Vanat, T.

    2017-01-01

    The ALICE Collaboration is preparing a major upgrade to the experimental apparatus. A key element of the upgrade is the construction of a new silicon-based Inner Tracking System containing 12 Gpixels in an area of 10 m2. Its readout system consists of 192 readout units that control the pixel sensors and the power units, and deliver the sensor data to the counting room. A prototype readout board has been designed to test: the interface between the sensor modules and the readout electronics, the signal integrity and reliability of data transfer, the interface to the ALICE DAQ and trigger, and the susceptibility of the system to the expected radiation level.

  17. Upgrading and Fixing Computers Do-it-Yourself for Dummies

    CERN Document Server

    Rathbone, Andy

    2010-01-01

    An illustrated, step-by-step guide to repairs and upgrades. Whether you want to prepare your computer for Windows 7, avoid investing in a new one, or just "go green", this fully illustrated guide has what you need. You'll learn how to add printers and new keyboards, boost your PC's performance and increase memory, improve power consumption, rev up your multimedia capacity, and much more. Step-by-step instructions are accompanied by photos that show you exactly what you should see at every stage.: Learn to perform basic upgrades and prepare your PC for high-speed Internet connections,

  18. The upgraded MAGIC Cherenkov telescopes

    Energy Technology Data Exchange (ETDEWEB)

    Tescaro, D., E-mail: dtescaro@iac.es [Instituto de Astrofísica de Canarias (IAC), E-38205 La Laguna, Tenerife (Spain); Universidad de La Laguna (ULL), Dept. Astrofísica, E-38206 La Laguna, Tenerife (Spain)

    2014-12-01

    The MAGIC Cherenkov telescopes underwent a major upgrade in 2011 and 2012. A new 1039-pixel camera and a larger area digital trigger system were installed in MAGIC-I, making it essentially identical to the newer MAGIC-II telescope. The readout systems of both telescopes were also upgraded, with fully programmable receiver boards and DRS4-chip-based digitization systems. The upgrade eased the operation and maintenance of the telescopes and also improved significantly their performance. The system has now an integral sensitivity as good as 0.6% of the Crab Nebula flux (for E>400GeV), with an effective analysis threshold at 70 GeV. This allows MAGIC to secure one of the leading roles among the current major ground-based Imaging Atmospheric Cherenkov telescopes for the next 5–10 years. - Highlights: • In 2011 and 2012 the MAGIC telescopes underwent a two-stage major upgrade. • The new camera of MAGIC-I allows us to exploit a 1.4 larger trigger area. • The novel DRS4-based readout systems allow a cost-effective ultra-fast digitization. • The upgrade greatly improved the maintainability of the system. • MAGIC has now an optimal integral sensitivity of 0.6% of the Crab Nebula flux.

  19. Alaska Seismic Network Upgrade and Expansion

    Science.gov (United States)

    Sandru, J. M.; Hansen, R. A.; Estes, S. A.; Fowler, M.

    2009-12-01

    AEIC (Alaska Earthquake Information Center) has begun the task of upgrading the older regional seismic monitoring sites that have been in place for a number of years. Many of the original sites (some dating to the 1960's) are still single component analog technology. This was a very reasonable and ultra low power reliable system for its day. However with the advanced needs of today's research community, AEIC has begun upgrading to Broadband and Strong Motion Seismometers, 24 bit digitizers and high-speed two-way communications, while still trying to maintain the utmost reliability and maintaining low power consumption. Many sites have been upgraded or will be upgraded from single component to triaxial broad bands and triaxial accerometers. This provided much greater dynamic range over the older antiquated technology. The challenge is compounded by rapidly changing digital technology. Digitizersand data communications based on analog phone lines utilizing 9600 baud modems and RS232 are becoming increasingly difficult to maintain and increasingly expensive compared to current methods that use Ethernet, TCP/IP and UDP connections. Gaining a reliable Internet connection can be as easy as calling up an ISP and having a DSL connection installed or may require installing our own satellite uplink, where other options don't exist. LANs are accomplished with a variety of communications devices such as spread spectrum 900 MHz radios or VHF radios for long troublesome shots. WANs are accomplished with a much wider variety of equipment. Traditional analog phone lines are being used in some instances, however 56K lines are much more desirable. Cellular data links have become a convenient option in semiurban environments where digital cellular coverage is available. Alaska is slightly behind the curve on cellular technology due to its low population density and vast unpopulated areas but has emerged into this new technology in the last few years. Partnerships with organizations

  20. Reputation-Based Trust for a Cooperative, Agent-Based Backup Protection Scheme for Power Networks

    Science.gov (United States)

    2010-03-01

    operational and nonoperational data. Public standards such as IEC 61850 and the transition to internet technology have increased interoperability but also...Pool, Percy E. and Larry Young. ―Wire Line Subcommittee: P1692 Guide for the Protection of Communication Installations from Lightning Effects.‖ n

  1. Power backup Density based Clustering Algorithm for Maximizing Lifetime of Wireless Sensor Networks

    DEFF Research Database (Denmark)

    Wagh, Sanjeev; Prasad, Ramjee

    2014-01-01

    WSNs consists several nodes spread over experimental fields for specific application temporarily. The spatially distributed sensor nodes sense and gather the information for intended parameters like temperature, sound, vibrations, etc for the particular application. In this paper, we evaluate the...

  2. Moscow Meson Factory DTL RF System Upgrade

    CERN Document Server

    Esin, S K; Kvasha, A I; Serov, V L

    2004-01-01

    The last paper devoted to description of the first part (DTL) RF system of Moscow Meson Factory upgrade was published in the Proceedings of PAC95 Conference in Dallas. Since then some new works directed at improvement of reliability and efficiency of the RF system were carried out. Among them there are a new powerful pulse triode “Katran” installed in the output RF power amplifiers (PA) of three channels, modifications of the anode modulator control circuit and crow-bar system, a new additional RF channel for RF supply of RFQ and some alterations in placing of the anode modulator equipment decreasing a level of interference’s at crow-bar circuits. Some new checked at MMF RF channels ideas concerning of PA tuning are of interest for people working in this sphere of activity.

  3. Upgrade of the DIII-D vacuum vessel protection system

    Energy Technology Data Exchange (ETDEWEB)

    Hollerbach, M.A.; Lee, R.L.; Smith, J.P.; Taylor, P.L.

    1993-10-01

    An upgrade of the General Atomics DIII-D tokamak armor protection system has been completed. The upgrade consisted of armoring the outer wall and the divertor gas baffle with monolithic graphite tiles and cleaning the existing floor, ceiling, and inner wall tiles to remove any deposited impurity layer from the tile surfaces. The new tiles replace the graphite tiles used as local armor for neutral beam shine through, three graphite poloidal back-up limiter bands, and miscellaneous Inconel protection tiles. The total number of tiles increased from 1636 to 3200 and corresponding vessel coverage from 40% to 90%. A new, graphite armored, toroidally continuous, gas baffle between the outer wall and the biased divertor ring was installed in order to accommodate the cryocondensation pump that was installed in parallel with the outer wall tiles. To eliminate a source of copper in the plasma, GRAFOIL gaskets replaced the copper felt metal gaskets previously used as a compliant heat transfer interface between the inertially cooled tiles and the vessel wall. GRAFOIL, an exfoliated, flexible graphite material from Union Carbide, Inc., was used between each tile and the vessel wall and also between each tile and its hold-down hardware. Testing was performed to determine the mechanical compliance, thermal conductance, and vacuum characteristics of the GRAFOIL material. To further decrease the quantity of high Z materials exposed to the plasma, the 1636 existing graphite tiles were identified, removed, and grit blasted to eliminate a thin layer of deposited metals which included nickel, chromium, and molybdenum. Prior to any processing, a selected set of tiles was tested for radioactivity, including tritium contamination. The tiles were grit blasted in a negative-pressure blasting cabinet using 37 {mu}m boron carbide powder as the blast media and dry nitrogen as the propellant.

  4. Technologies for Upgrading Light Water Reactor Outlet Temperature

    Energy Technology Data Exchange (ETDEWEB)

    Daniel S. Wendt; Piyush Sabharwall; Vivek Utgikar

    2013-07-01

    Nuclear energy could potentially be utilized in hybrid energy systems to produce synthetic fuels and feedstocks from indigenous carbon sources such as coal and biomass. First generation nuclear hybrid energy system (NHES) technology will most likely be based on conventional light water reactors (LWRs). However, these LWRs provide thermal energy at temperatures of approximately 300°C, while the desired temperatures for many chemical processes are much higher. In order to realize the benefits of nuclear hybrid energy systems with the current LWR reactor fleets, selection and development of a complimentary temperature upgrading technology is necessary. This paper provides an initial assessment of technologies that may be well suited toward LWR outlet temperature upgrading for powering elevated temperature industrial and chemical processes during periods of off-peak power demand. Chemical heat transformers (CHTs) are a technology with the potential to meet LWR temperature upgrading requirements for NHESs. CHTs utilize chemical heat of reaction to change the temperature at which selected heat sources supply or consume thermal energy. CHTs could directly utilize LWR heat output without intermediate mechanical or electrical power conversion operations and the associated thermodynamic losses. CHT thermal characteristics are determined by selection of the chemical working pair and operating conditions. This paper discusses the chemical working pairs applicable to LWR outlet temperature upgrading and the CHT operating conditions required for providing process heat in NHES applications.

  5. Status of the CMS Phase I pixel detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Spannagel, S., E-mail: simon.spannagel@desy.de

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  6. Creating new life for hydraulic turbines by upgrading and rehabilitation

    Energy Technology Data Exchange (ETDEWEB)

    Wachter, G.F.

    1998-12-01

    Methods by which to extend the life of aging hydraulic turbines which are still in operation today are discussed. Upgrading some of these turbines which were built as far back as 80 years ago may be feasible with current rehabilitation technology and advanced computer aided hydraulic mechanical design analysis techniques. The benefits achieved with many hydraulic turbine upgrade and rehabilitation programs include: (1) increased performance, (2) extended service life, (3) stopping accelerated deterioration due to cavitation, (4) reducing detrimental symptoms such as unit vibration, component cracking and excessive wearing ring clearances, (5) reducing the possibility of major failures, and (6) reducing unscheduled forced outages. Increased usage of a non-polluting, renewable energy source is an additional benefit of rehabilitation and upgrading of hydro power generating units.2 refs., 2 tabs., 7 figs.

  7. Status of the CMS Phase I Pixel Detector Upgrade

    CERN Document Server

    AUTHOR|(CDS)2083994

    2016-01-01

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase~I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  8. Real Mission Profile Based Lifetime Estimation of Fuel-cell Power Converter

    DEFF Research Database (Denmark)

    Zhou, Dao; Wang, Huai; Blaabjerg, Frede

    2016-01-01

    Fuel cells are becoming a promising energy source for various applications due to its relatively high efficiency and reliability, and low pollution. They have been applied in backup power systems in telecom applications, where reliability and availability are high priority performance factors...... on the degradation of MOSFETs during the standby mode. At the presence of power outages, the backup system is activated into the operation mode and the MOSFETs withstand additional thermal stresses due to power losses. A study case of a 1 kW backup system is presented with two annual mission profiles in Denmark...

  9. Gestión de un Sistema de Back-ups

    OpenAIRE

    Macho Adalia, Juan Carlos

    2010-01-01

    Proyecto Fin de Carrera leído en la Universidad Rey Juan Carlos en el curso académico 2009/2010. Tutor del Proyecto: Javier Martínez Moguerza El siguiente Proyecto Fin de Carrera consistirá en la instalación y gestión de un sistema de back-up. Es decir, trataremos desde la instalación del software, llamado Backup Exec 2010, hasta su conexión y gestión con la librería robótica usada para realizar las copias de seguridad. Relacionado al robot, llamado Sun StorageTek L180, explica...

  10. A kernel plus method for quantifying wind turbine performance upgrades

    KAUST Repository

    Lee, Giwhyun

    2014-04-21

    Power curves are commonly estimated using the binning method recommended by the International Electrotechnical Commission, which primarily incorporates wind speed information. When such power curves are used to quantify a turbine\\'s upgrade, the results may not be accurate because many other environmental factors in addition to wind speed, such as temperature, air pressure, turbulence intensity, wind shear and humidity, all potentially affect the turbine\\'s power output. Wind industry practitioners are aware of the need to filter out effects from environmental conditions. Toward that objective, we developed a kernel plus method that allows incorporation of multivariate environmental factors in a power curve model, thereby controlling the effects from environmental factors while comparing power outputs. We demonstrate that the kernel plus method can serve as a useful tool for quantifying a turbine\\'s upgrade because it is sensitive to small and moderate changes caused by certain turbine upgrades. Although we demonstrate the utility of the kernel plus method in this specific application, the resulting method is a general, multivariate model that can connect other physical factors, as long as their measurements are available, with a turbine\\'s power output, which may allow us to explore new physical properties associated with wind turbine performance. © 2014 John Wiley & Sons, Ltd.

  11. Upgrade trigger: Bandwidth strategy proposal

    CERN Document Server

    Boettcher, Thomas Julian; Meloni, Simone; Whitehead, Mark Peter; Williams, Mark Richard James

    2017-01-01

    This document describes a proposed selection strategy for the upgrade trigger using charm signals as a benchmark. The Upgrade trigger uses a 'Run2-like' sequence consisting of a first and second stage, in between which the calibration and alignment is performed. The first stage, HLT1, uses an inclusive strategy to select beauty and charm, while the second stage uses offline-quality exclusive selections. A novel genetic algorithm-based bandwidth division is performed at the second stage to maximise the output of useful physics events, and a range of possible signal efficiencies are presented as a function of the available bandwidth.

  12. Upgrade trigger: Bandwidth strategy proposal

    CERN Document Server

    Fitzpatrick, Conor; Meloni, Simone; Boettcher, Thomas Julian; Whitehead, Mark Peter; Dziurda, Agnieszka; Vesterinen, Mika Anton

    2017-01-01

    This document describes a selection strategy for the upgrade trigger using charm signals as a benchmark. The Upgrade trigger uses a 'Run 2-like' sequence consisting of a first and second stage, in between which the calibration and alignment is performed. The first stage, HLT1, uses an inclusive strategy to select beauty and charm decays, while the second stage uses offline-quality exclusive selections. A novel genetic algorithm-based bandwidth division is performed at the second stage to distribute the output bandwidth among different physics channels, maximising the efficiency for useful physics events. The performance is then studied as a function of the available output bandwidth.

  13. On the nonlinear dynamics of two types of backup bearings - Theoretical and experimental aspects

    DEFF Research Database (Denmark)

    Lahriri, Said; Santos, Ilmar F.; Weber, Hans I.

    2012-01-01

    The possible contact between rotor and stator can for some cases be considered a serious malfunction that may lead to catastrophic failure. Rotor rub is considered a secondary phenomenon caused by a primary source that leads to a disruption of the normal operational condition. It arises from sudd...... at impact is forced to the center of the backup bearing and the lateral motion is mitigated. As a result of this, the rotor spin is kept constant. © 2012 American Society of Mechanical Engineers....

  14. A New Technique to Backup and Restore DBMS using XML and .NET Technologies

    CERN Document Server

    Kadry, Seifedine; Kassem, Hussam; Hayek, Hassan

    2011-01-01

    In this paper, we proposed a new technique for backing up and restoring different Database Management Systems (DBMS). The technique is enabling to backup and restore a part of or the whole database using a unified interface using ASP.NET and XML technologies. It presents a Web Solution allowing the administrators to do their jobs from everywhere, locally or remotely. To show the importance of our solution, we have taken two case studies, oracle 11g and SQL Server 2008.

  15. Backup Alignment Devices on Shuttle: Heads-Up Display or Crew Optical Alignment Sight

    Science.gov (United States)

    Chavez, Melissa A.

    2011-01-01

    NASA s Space Shuttle was built to withstand multiple failures while still keeping the crew and vehicle safe. Although the design of the Space Shuttle had a great deal of redundancy built into each system, there were often additional ways to keep systems in the best configuration if a failure were to occur. One such method was to use select pieces of hardware in a way for which they were not primarily intended. The primary function of the Heads-Up Display (HUD) was to provide the crew with a display of flight critical information during the entry phase. The primary function of the Crew Optical Alignment Sight (COAS) was to provide the crew an optical alignment capability for rendezvous and docking phases. An alignment device was required to keep the Inertial Measurement Units (IMUs) well aligned for a safe Entry; nominally this alignment device would be the two on-board Star Trackers. However, in the event of a Star Tracker failure, the HUD or COAS could also be used as a backup alignment device, but only if the device had been calibrated beforehand. Once the HUD or COAS was calibrated and verified then it was considered an adequate backup to the Star Trackers for entry IMU alignment. There were procedures in place and the astronauts were trained on how to accurately calibrate the HUD or COAS and how to use them as an alignment device. The calibration procedure for the HUD and COAS had been performed on many Shuttle missions. Many of the first calibrations performed were for data gathering purposes to determine which device was more accurate as a backup alignment device, HUD or COAS. Once this was determined, the following missions would frequently calibrate the HUD in order to be one step closer to having the device ready in case it was needed as a backup alignment device.

  16. Optimization of Preventive Grinding of Backup Roll against Contact Fatigue Cracking

    Institute of Scientific and Technical Information of China (English)

    DOU Peng; LI You-guo; LIANG Kai-ming; BAI Bing-zhe

    2005-01-01

    In order to optimize the current grinding procedure of the backup roll of 2050 continuously variable crown (CVC) mills, the behavior of rolling contact fatigue (RCF) cracking was investigated. Two RCF short cracks, including vertical short crack and ratcheting short crack initiated from ratcheting, were observed. The behavior of both RCF cracks was analyzed in detail. Then a modified grinding procedure was proposed according to the behavior of RCF cracks and the preventive grinding strategy.

  17. Power feeding to terminal devices in optical subscriber network; Hikari fuaiba tsushin ni okeru tanmatsu kiki eno kyuden

    Energy Technology Data Exchange (ETDEWEB)

    Yamasaki, M

    1998-09-01

    This paper outlines present state of the feeding system in the light access system in consideration of backup in case of home power failure. In the optical communication, equipment with bilateral conversion function for light and electricity has to be installed both on communication service side and home side. Outline of the light access system and equipment requiring backup are shown. The following items are explained: main types of the light access system, such as FTTC (fiber to the curb), FTTP (fiber to the pole), FTTH (fiber to the home) and HFC (hybrid fiber coax), and the feeding system; problems on feeding system for the light access system. Key elements of ONU (optical network unit) for FTTH and construction of the ONU power source are illustrated. The ONU power source is composed of a backup power supply unit and main body supply unit. Backup power is indispensable to the ONU and analog telephones: output is supplied by the backup batteries in power failure. For miniaturization of the backup power source, power supply circuits and backup batteries have to be miniaturized simultaneously. History of miniaturization is explained on the experimental models. 6 refs., 7 figs., 1 tab.

  18. Improved backup routing protocol of AODV based on PLC network%基于PLC网络的改进AODV备份路由协议

    Institute of Scientific and Technical Information of China (English)

    李训文; 金文光; 邵琦青; 高伟

    2013-01-01

    为了减少AODV协议链路断裂时的修复时间,提出利用Hello消息改进AODV的备份路由协议——AODV-IB,并将其应用于电力线通信(PLC)网络.AODV-IB在AODV-ABL协议的基础上,利用Hello消息携带备份路由的目的节点IP、序列号与跳数等信息,通过制定避免备份路由产生环路的规则,依据最短路径的原则,使各个节点周期交换Hello消息后均能够获得最佳的备份路由信息,即使得节点能够同时维护主路由与备份路由,并在主链路断裂时可以利用备份路由进行快速恢复.为了测试协议性能,搭建基于电力线通信网络的测试平台,对AODV-IB以及AODV、AODV-BR、AODV-ABL、IBR-AODV5种协议进行测试.实验结果表明,电力线通信网络环境中AODV-IB在减少延时、提高数据包投递率方面较其余4种协议性能更好,更加适合在电力线通信网络中使用.%An improved backup routing protocol of AODV——AODV-IB was proposed and deployed in power line communication (PLC) network in order to reduce the delay of AODV routing reconstruction.The AODV-IB modified AODV-ABL and used Hello message to carry the backup routing information of destination node IP,serial number and hops.According to the principle of the shortest path and the regulation of avoiding backup routing loops,each node with the AODV-IB can get optimal backup routing information after cyclical exchange of Hello message.Each node with the AODV-IB can maintain primary routing and backup routing at the same time.Once the primary link breaks,it can be quickly recovered by using the backup routing.For the performance evaluation of the AODV-IB,a test-bed based on PLC network was constructed.Protocols of AODV-IB,AODV,AODV-BR,AODV-ABL and IBR-AODV were tested.Experimental results show that AODV-IB is vastly superior to other four protocols in the aspects of reducing the delay and improving the packet delivery ratio.AODV-IB is more suitable for the PLC network.

  19. A Driven Backup Routing Table to Find Alternative Dijoint Path in Ad Hoc Wireless

    CERN Document Server

    abujassar, Radwan

    2011-01-01

    The performances of the routing protocols are important since they compute the primary path between source and destination. In addition, routing protocols need to detect failure within a short period of time when nodes move to start updating the routing table in order to find a new primary path to the destination. Meantime, loss of packets and end-to- end delays will increase thereby reducing throughput and degrading the performance of the network. This paper proposes a new algorithm, DBRT (Driven Backup Routing Table), to improve the existing proactive protocols such as DSDV (Destination Sequenced Distance Vector) protocol by creating a backup routing table to provide multiple alternative routes. The DBRT algorithm identifies adjacent nodes for each node in the same range and then selects one of these as a backup next hop according to the available path to the destination. The results show that loss of data packets, throughput and end-to-end delay times between source and destination are improved. The result...

  20. Influence of unbalance levels on nonlinear dynamics of a rotor-backup rolling bearing system

    Science.gov (United States)

    Fonseca, Cesar A.; Santos, Ilmar F.; Weber, Hans I.

    2017-04-01

    Rotor drops in magnetic bearing and unbalance in rotors have been objective of study for many years. The combination of these two well-known phenomena led to an interesting chaotic response, when the rotor touches the inner race of the back-up bearing. The present work explores the nonlinear rotor backup bearing dynamics both theoretically and experimentally using a fully instrumented test rig, where the position of shaft, its angular velocity and the contact forces between the shaft and the backup bearing are sampled at 25 kHz. The test rig is built by a removable passive magnetic bearing, which allows for simulation of magnetic bearing failure (loss of carrying capacity and rotor fall). The rotor is studied numerically as well as experimentally. A theoretical approach is given beforehand and supplies the basis of the study. Finally the presented results are commented on the point of view of nonlinear dynamics applied to the practical use. The theoretical and numerical analyses are shown through orbit plots, phase plans, Poincaré maps, force response in time and double sided spectrum. The latter is important to characterize the condition at different levels of unbalance between forward and backward whirl. Our preliminary results indicate that for smaller amount of unbalance the rotor swings at the bottom of the bearing, the more the unbalance increases, other dynamical behavior occur and some can be extremely harmful, since the rotor can be lifted from the contact state and return, starting to impact innumerable times without reaching a steady state.

  1. Upgrading of the West Area

    CERN Multimedia

    1983-01-01

    The rejigged main hall (EHW1) in the West Area: on background, below the crane, is the brown yoke of the Omega magnet which had been resited. The upgrading was completed by the time in July when 400 GeV protons arrived. See Annual Report 1983 p. 107.

  2. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Zohm, H.; Adamek, J.; Angioni, C.

    2009-01-01

    ASDEX Upgrade was operated with a fully W-covered wall in 2007 and 2008. Stationary H-modes at the ITER target values and improved H-modes with H up to 1.2 were run without any boronization. The boundary conditions set by the full W wall (high enough ELM frequency, high enough central heating and...

  3. ATLAS Detector : Performance and Upgrades

    CERN Document Server

    Oliveira Damazio, Denis; The ATLAS collaboration

    2016-01-01

    Describe the ATLAS detector and summarize most relevant and recent information about the detector performance in 2016 with LHC colliding bunches at sqrt(s)=13 TeV with luminosity above the nominal value. Describe the different upgrade phases previewed for the detector and main activities already ongoing.

  4. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Amdor, C.; Angioni, C.; Balden, M.; Bardin, S.; L. Barrera Orte,; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Birkenmeier, G.; Bobkov, V.; Boom, J.; Bottereau, C.; Bottino, A.; Braun, F.; Brezinsek, S.; Brochard, T.; M. Brüdgam,; Buhler, A.; Burckhart, A.; Casson, F. J.; Chankin, A.; Chapman, I.; Clairet, F.; Classen, I.G.J.; Coenen, J. W.; Conway, G. D.; Coster, D. P.; Curran, D.; da Silva, F.; P. de Marné,; D' Inca, R.; Douai, D.; Drube, R.; Dunne, M.; Dux, R.; Eich, T.; Eixenberger, H.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fischer, R.; H. Fünfgelder,; Fuchs, J. C.; K. Gál,; M. García Muñoz,; Geiger, B.; Giannone, L.; T. Görler,; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Guimarais, L.; S. Günter,; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; T. Härtl,; Hauff, T.; Heinemann, B.; Herrmann, A.; Hobirk, J.; H. Höhnle,; M. Hölzl,; Hopf, C.; Houben, A.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kantor, M.; C.-P. Käsemann,; Kallenbach, A.; S. Kálvin,; Kantor, M.; Kappatou, A.; Kardaun, O.; Kasparek, W.; Kaufmann, M.; Kirk, A.; H.-J. Klingshirn,; Kocan, M.; Kocsis, G.; Konz, C.; Koslowski, R.; Krieger, K.; Kubic, M.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Lazaros, A.; Leipold, F.; Leuterer, F.; Lindig, S.; Lisgo, S.; Lohs, A.; Lunt, T.; Maier, H.; Makkonen, T.; Mank, K.; M.-E. Manso,; Maraschek, M.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Mehlmann, F.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Müller, S.; H.W. Müller,; M. Münich,; Neu, G.; Neu, R.; Neuwirth, D.; Nocente, M.; Nold, B.; Noterdaeme, J. M.; Pautasso, G.; Pereverzev, G.; B. Plöckl,; Podoba, Y.; Pompon, F.; Poli, E.; Polozhiy, K.; Potzel, S.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reimold, F.; Ribeiro, T.; Riedl, R.; Rohde, V.; van Rooij, G. J.; Roth, J.; Rott, M.; Ryter, F.; Salewski, M.; Santos, J.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schrittwieser, R.; Schubert, M.; Schweinzer, J.; Scott, B.; Sempf, M.; Sertoli, M.; Siccinio, M.; Sieglin, B.; Sigalov, A.; Silva, A.; Sommer, F.; A. Stäbler,; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Tala, T.; Tardini, G.; Teschke, M.; Tichmann, C.; Told, D.; Treutterer, W.; Tsalas, M.; VanZeeland, M. A.; Varela, P.; Veres, G.; Vicente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Viola, B.; Vorpahl, C.; Wachowski, M.; Wagner, D.; Wauters, T.; Weller, A.; Wenninger, R.; Wieland, B.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; E. Würsching,; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron reso

  5. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Kallenbach, A.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Angioni, C.; Atanasiu, C. V.; Balden, M.; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Bobkov, V.; Boom, J.; Bottino, A.; Braun, F.; Brudgam, M.; Buhler, A.; Burckhart, A.; Chankin, A.; Classen, I.G.J.; Conway, G. D.; Coster, D. P.; de Marne, P.; D' Inca, R.; Drube, R.; Dux, R.; Eich, T.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fahrbach, H. U.; Fattorini, L.; Fischer, R.; Flaws, A.; Funfgelder, H.; Fuchs, J. C.; Gal, K.; Munoz, M. G.; Geiger, B.; Adamov, M. G.; Giannone, L.; Giroud, C.; Gorler, T.; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Gunter, S.; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; Hauff, T.; Heinemann, B.; Herrmann, A.; Hicks, N.; Hobirk, J.; Hohnle, H.; Holzl, M.; Hopf, C.; Horton, L.; Huart, M.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kasemann, C. P.; Kalvin, S.; Kardaun, O.; Kaufmann, M.; Kirk, A.; Klingshirn, H. J.; Kocan, M.; Kocsis, G.; Kollotzek, H.; Konz, C.; Koslowski, R.; Krieger, K.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Leipold, F.; Leuterer, F.; Lohs, A.; N C Luhmann Jr.,; Lunt, T.; Lyssoivan, A.; Maier, H.; Maggi, C.; Mank, K.; Manso, M. E.; Maraschek, M.; Martin, P.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Muller, H. W.; Munich, M.; Murmann, H.; Neu, G.; Neu, R.; Nold, B.; Noterdaeme, J. M.; Park, H. K.; Pautasso, G.; Pereverzev, G.; Podoba, Y.; Pompon, F.; Poli, E.; Polochiy, K.; Potzel, S.; Prechtl, M.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reiter, B.; Ribeiro, T.; Riedl, R.; Rohde, V.; Roth, J.; Rott, M.; Ryter, F.; Sandmann, W.; Santos, J.; Sassenberg, K.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schramm, G.; Schrittwieser, R.; Schweinzer, J.; Scott, B.; Sempf, M.; Serra, F.; Sertoli, M.; Siccinio, M.; Sigalov, A.; Silva, A.; Sips, A.C.C.; Sommer, F.; Stabler, A.; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Szepesi, T.; Tardini, G.; Tichmann, C.; Told, D.; Treutterer, W.; Urso, L.; Varela, P.; Vincente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Vorpahl, C.; Wagner, D.; Weller, A.; Wenninger, R.; Wieland, B.; Wigger, C.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; Wursching, E.; Yadikin, D.; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2011-01-01

    The ASDEX Upgrade programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. After the finalization of the tungsten coating of the plasma facing components, the re-availabil

  6. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Amdor, C.; Angioni, C.; Balden, M.; Bardin, S.; L. Barrera Orte,; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Birkenmeier, G.; Bobkov, V.; Boom, J.; Bottereau, C.; Bottino, A.; Braun, F.; Brezinsek, S.; Brochard, T.; M. Brüdgam,; Buhler, A.; Burckhart, A.; Casson, F. J.; Chankin, A.; Chapman, I.; Clairet, F.; Classen, I.G.J.; Coenen, J. W.; Conway, G. D.; Coster, D. P.; Curran, D.; da Silva, F.; P. de Marné,; D' Inca, R.; Douai, D.; Drube, R.; Dunne, M.; Dux, R.; Eich, T.; Eixenberger, H.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fischer, R.; H. Fünfgelder,; Fuchs, J. C.; K. Gál,; M. García Muñoz,; Geiger, B.; Giannone, L.; T. Görler,; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Guimarais, L.; S. Günter,; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; T. Härtl,; Hauff, T.; Heinemann, B.; Herrmann, A.; Hobirk, J.; H. Höhnle,; M. Hölzl,; Hopf, C.; Houben, A.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kantor, M.; C.-P. Käsemann,; Kallenbach, A.; S. Kálvin,; Kantor, M.; Kappatou, A.; Kardaun, O.; Kasparek, W.; Kaufmann, M.; Kirk, A.; H.-J. Klingshirn,; Kocan, M.; Kocsis, G.; Konz, C.; Koslowski, R.; Krieger, K.; Kubic, M.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Lazaros, A.; Leipold, F.; Leuterer, F.; Lindig, S.; Lisgo, S.; Lohs, A.; Lunt, T.; Maier, H.; Makkonen, T.; Mank, K.; M.-E. Manso,; Maraschek, M.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Mehlmann, F.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Müller, S.; H.W. Müller,; M. Münich,; Neu, G.; Neu, R.; Neuwirth, D.; Nocente, M.; Nold, B.; Noterdaeme, J. M.; Pautasso, G.; Pereverzev, G.; B. Plöckl,; Podoba, Y.; Pompon, F.; Poli, E.; Polozhiy, K.; Potzel, S.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reimold, F.; Ribeiro, T.; Riedl, R.; Rohde, V.; van Rooij, G. J.; Roth, J.; Rott, M.; Ryter, F.; Salewski, M.; Santos, J.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schrittwieser, R.; Schubert, M.; Schweinzer, J.; Scott, B.; Sempf, M.; Sertoli, M.; Siccinio, M.; Sieglin, B.; Sigalov, A.; Silva, A.; Sommer, F.; A. Stäbler,; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Tala, T.; Tardini, G.; Teschke, M.; Tichmann, C.; Told, D.; Treutterer, W.; Tsalas, M.; VanZeeland, M. A.; Varela, P.; Veres, G.; Vicente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Viola, B.; Vorpahl, C.; Wachowski, M.; Wagner, D.; Wauters, T.; Weller, A.; Wenninger, R.; Wieland, B.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; E. Würsching,; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron reso

  7. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Kallenbach, A.; Adamek, J.; Aho-Mantila, L.

    2011-01-01

    The ASDEX Upgrade programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. After the finalization of the tungsten coating of the plasma facing components, the re-availa...

  8. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron r...

  9. Recent Upgrade of the Klystron Modulator at SLAC

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

    2011-11-04

    The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

  10. Aging Effects and Estimating Degradation Mechanisms of Thermally Upgraded Paper in Mineral Oil

    Science.gov (United States)

    Miyagi, Katsunori; Oe, Etsuo; Yamagata, Naoki

    The life of a transformer is limited to the deterioration of its solid insulation. Winding conductors and other solid insulation materials in oil-immersed transformers have been insulated using cellulose products. For many years, manufacturers have met the needs of special applications by designing transformers using thermally upgraded materials to achieve lighter weight, higher power density and increased life. Recently, the effect of thermally upgraded insulation on diagnostic techniques such as gas-in oil analysis, and their indication of insulation degradation have been reviewed. This paper describes evaluations of the thermal degradation characteristics and decomposition reactions in mineral transformer oil of amine-impregnated thermally upgraded paper insulation. The thermal resistance of the thermally upgraded paper is evaluated by comparison with Kraft paper insulation. Further, aging degradation mechanisms of decompositional degradation of the thermally upgraded paper due to aging in mineral transformer oil are proposed.

  11. LHCb: Fast Readout Control for the upgraded readout architecture of the LHCb experiment at CERN

    CERN Multimedia

    Alessio, F

    2013-01-01

    The LHCb experiment at CERN has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity with an upgraded LHCb detector. As a consequence, the various LHCb sub-systems in the readout architecture will be upgraded to cope with higher sub-detector occupancies, higher rate, and higher readout load. The new architecture, new functionalities, and the first hardware implementation of a new LHCb Readout Control system (commonly referred to as S-TFC) for the upgraded LHCb experiment is here presented. Our attention is focused in describing solutions for the distribution of clock and timing information to control the entire upgraded readout architecture by profiting of a bidirectional optical network and powerful FPGAs, including a real-time mechanism to synchronize the entire system. Solutions and implementations are presented, together with first results on the simulation and the validation of the system.

  12. Power

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård; Fogsgaard, Morten

    2016-01-01

    In this chapter, we will explore the dynamics of power in processes of creativity, and show its paradoxical nature as both a bridge and a barrier to creativity in organisations. Recent social psychological experimental research (Slighte, de Dreu & Nijstad, 2011) on the relation between power...... and creativity suggests that when managers give people the opportunity to gain power and explicate that there is reason to be more creative, people will show a boost in creative behaviour. Moreover, this process works best in unstable power hierarchies, which implies that power is treated as a negotiable...... and floating source for empowering people in the organisation. We will explore and discuss here the potentials, challenges and pitfalls of power in relation to creativity in the life of organisations today. The aim is to demonstrate that power struggles may be utilised as constructive sources of creativity...

  13. Big advance towards the LHC upgrade

    CERN Multimedia

    CERN Bulletin

    2010-01-01

    The LHC is currently the world’s most powerful accelerator. With its technical achievements it has already set world records. However, big science looks very far ahead in time and is already preparing already for the LHC’s magnet upgrade, which should involve a 10-fold increase of the collision rates toward the end of the next decade. The new magnet technology involves the use of an advanced superconducting material that has just started to show its potential.   The first Long Quadrupole Shell (LQS01) model during assembly at Fermilab. The first important step in the qualification of the new technology for use in the LHC was achieved at the beginning of December when the US LHC Accelerator Research Program (LARP) – a consortium of Brookhaven National Laboratory, Fermilab, Lawrence Berkeley National Laboratory and the SLAC National Accelerator Laboratory founded by US Department Of Energy (DOE) in 2003 – successfully tested the first long focussing magnet th...

  14. PEP-II Transverse Feedback Electronics Upgrade

    CERN Document Server

    Weber, Jonah; Chin, Michael; Doolittle, Lawrence

    2005-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx® ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  15. PEP-II Transverse Feedback Electronics Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Weber, J.M.; Chin, M.J.; Doolittle, L.R.; /LBL, Berkeley; Akre, R.; /SLAC

    2006-03-13

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx{reg_sign} ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  16. PEP-II Transverse Feedback Electronics Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Weber, J.; Chin, M.; Doolittle, L.; Akre, R.

    2005-05-09

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(R) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  17. Take control of upgrading to Leopard

    CERN Document Server

    Kissell, Joe

    2009-01-01

    Start on the right foot with Mac OS X 10.5 Leopard! Little is more exciting and unnerving than a major operating system upgrade for your Mac, but thousands of people have upgraded to Panther and Tiger calmly and successfully with the advice in Joe Kissell's previous hit Take Control of Upgrading... titles. Joe's expert guidance, developed over innumerable test installations, walks you through the six steps necessary before upgrading, which of Leopard's three installation options is right for you, how to perform the actual upgrade, and post-installation checking and cleanup.

  18. O strategii razvitija regional'nogo jelektrojenergeticheskogo kompleksa Kaliningradskoj oblasti [On the strategy for power sector development in the Kaliningrad region

    Directory of Open Access Journals (Sweden)

    Gnatyuk Viktor

    2010-01-01

    Full Text Available The balanced power sector development in the Kaliningrad region requires an accurate estimation of the parameters of the main generation complex, the formation of a backup generation complex, and the efficient management of power sector.

  19. Tevatron Beam Position Monitor Upgrade

    CERN Document Server

    Wolbers, Stephen; Barker, B; Bledsoe, S; Boes, T; Bowden, Mark; Cancelo, Gugstavo I; Dürling, G; Forster, B; Haynes, B; Hendricks, B; Kasza, T; Kutschke, Robert K; Mahlum, R; Martens, Michael A; Mengel, M; Olsen, M; Pavlicek, V; Pham, T; Piccoli, Luciano; Steimel, Jim; Treptow, K; Votava, Margaret; Webber, Robert C; West, B; Zhang, D

    2005-01-01

    The Tevatron Beam Position Monitor (BPM) readout electronics and software have been upgraded to improve measurement precision, functionality and reliability. The original system, designed and built in the early 1980s, became inadequate for current and future operations of the Tevatron. The upgraded system consists of 960 channels of new electronics to process analog signals from 240 BPMs, new front-end software, new online and controls software, and modified applications to take advantage of the improved measurements and support the new functionality. The new system reads signals from both ends of the existing directional stripline pickups to provide simultaneous proton and antiproton position measurements. Measurements using the new system are presented that demonstrate its improved resolution and overall performance.

  20. Hydrogen assisted biological biogas upgrading

    DEFF Research Database (Denmark)

    Bassani, Ilaria

    , produced by water electrolysis, using excess of electricity from wind mills, is coupled with the CO2 contained in the biogas to convert them to CH4. This process is defined as biological biogas upgrading and is carried out by hydrogenotrophic methanogenic archaea that couples CO2 with H2 to produce...... of several recurrent microbial groups, including resilient methanogenic archaea such as Methanoculleus and Methanotermobacter and bacteria belonging to phylum Proteobacteria and genus Synthrophomonas. Moreover, upon H2 addition, the concomitant proliferation of hydrogenotrophic methanogens and syntrophic...... bacteria, such as Desulfovibrio, and some Thermoanaerobacteraceae and Syntrophomonadaceae, and the reduction of aceticlastic methanogens and fermentative bacteria state the role of the H2 moving biomethanation process toward the final steps stimulating CO2 consumption and therefore biogas upgrading....

  1. ATLAS-IBL Pixel Upgrade

    CERN Document Server

    LaRosa, A; The ATLAS collaboration

    2010-01-01

    The upgrade for the ATLAS detector will undergo different phase towards Super-LHC. The first upgrade for the Pixel Detector will consist in the construction of a new pixel layer which will be installed during the first shutdown of the LHC machine (SLHC Phase I). The new detector, called Insertable B-Layer (IBL), will be inserted between the existing pixel detector and a new (smaller radius) beam-pipe at a radius of 3.2 cm. The IBL will require the development of several new technologies to cope with increase of radiation or pixel occupancy and also to improve the physics performance which will be achieved by reduction of the pixel size and of the material budget. Three different promising sensor technologies (Planar-Si, 3D-Si and Diamond) are currently under investigation for the pixel detector. An overview of the project with particular emphasis on pixel module studies, irradiation and beam test plans will be presented.

  2. Fleet and backup tank sizing under regular and impulse stochastic demand patterns

    Science.gov (United States)

    Dupuis, Ronald Gerard

    The focus of this study involves logistics issues surrounding the industrial gas business. The industrial gas business is a major industry (approximately $30 billion/year) and has been experiencing substantial growth in recent years. The industrial gas business supports two types of customers. The first type is the traditional merchant customers who rely entirely on the logistics system for product. Their demand is of a stochastic nature. The second type of customers is referred to as customers. These customers have air separation plants on their own sites and they must rely on the logistics system when their separation plant fails. To assist in providing a continuous flow of product, all onsite plants also have a backup tank which can provide sufficient product for relatively short durations of time, 24 to 96 hours of supply. The onsite separation plants are approximately 98% reliable, but when they fail, the customer generally requires a significant amount of product. This type of demand pattern will be defined as impulse stochastic. This study focuses on two areas of the logistics support system. The first part deals with the economic sizing of onsite backup tanks. For a given onsite, we determine the most economical choice for a backup system considering numerous characteristics of the onsite customer as well as the logistics system. In the second part, we develop methods for determining the optimal fleet size under both regular and impulse stochastic demand patterns. The methods provide support for long range forecasting, short-term vehicle reallocation and private verses contract carrier vehicle mix determination. The methods further provide a means to describe the effect future onsite growth will have on distribution as it is related to vehicle fleet size.

  3. First lasing of the IR upgrade FEL at Jefferson lab

    Energy Technology Data Exchange (ETDEWEB)

    Christopher Behre; Stephen Benson; George Biallas; James Boyce; Christopher Curtis; David Douglas; H. Dylla; L. Dillon-townes; Richard Evans; Albert Grippo; Joseph Gubeli; David Hardy; John Heckman; Carlos Hernandez-Garcia; Tommy Hiatt; Kevin Jordan; Nikolitsa Merminga; George Neil; Joseph Preble; Harvey Rutt; Michelle D. Shinn; Timothy Siggins; Hiroyuki Toyokawa; David W. Waldman; Richard Walker; Neil Wilson; Byung Yunn; Shukui Zhang

    2004-08-01

    We report initial lasing results from the IR Upgrade FEL at Jefferson Lab[1]. The electron accelerator was operated with low average current beam at 80 MeV. The time structure of the beam was 120 pC bunches at 4.678 MHz with up to 750 {micro}sec pulses at 2Hz. Lasing was established over the entire wavelength range of the mirrors (5.5-6.6 {micro}m). The detuning curve length, turn-on time, and power were in agreement with modeling results assuming a 1 psec FWHM micropulse. The same model predicts over 10 kW of power output with 10 mA of beam and 10% output coupling, which is the ultimate design goal of the IR Upgrade FEL. The behavior of the laser while the dispersion section strength was varied was found to qualitatively match predictions. Initial CW lasing results also will be presented.

  4. Sustainable development and upgrading mode of coal industry in China

    Institute of Scientific and Technical Information of China (English)

    Gao Zhenguo

    2012-01-01

    It is an emerging realistic problem on how to promote a high level of technology in the coal industry,find new upgrading powers and create new competitive advantages,which are also the core problems to efficient transformation pattern of economic growth for coal industry in the "twelfth five year" period,involving the key to China's energy supply and energy security.Through field surveys and inductive analyses,analyzing of the content of upgrading the coal industry as an entry point,this paper analyzes the sustainable development mechanisms for the coal industry from the aspects of work force,power,methods,goals,and so on; and puts forward corresponding developmental modes according to the mecha nisms which can improve resource recovery and mineral resources utilization rates by putting them into practice.

  5. The ALICE pixel detector upgrade

    Science.gov (United States)

    Reidt, F.

    2016-12-01

    The ALICE experiment at the CERN LHC is designed to study the physics of strongly interacting matter, and in particular the properties of the Quark-Gluon Plasma, using proton-proton, proton-nucleus and nucleus-nucleus collisions. The ALICE collaboration is preparing a major upgrade of the experimental apparatus to be installed during the second long LHC shutdown in the years 2019-2020. A key element of the ALICE upgrade is the new, ultra-light, high-resolution Inner Tracking System. With respect to the current detector, the new Inner Tracking System will significantly enhance the pointing resolution, the tracking efficiency at low transverse momenta, and the read-out rate capabilities. This will be obtained by seven concentric detector layers based on a Monolithic Active Pixel Sensor with a pixel pitch of about 30×30 μm2. A key feature of the new Inner Tracking System, which is optimised for high tracking accuracy at low transverse momenta, is the very low mass of the three innermost layers, which feature a material budget of 0.3% X0 per layer. This contribution presents the design goals and layout of the upgraded ALICE Inner Tracking System, summarises the R&D activities focussing on the technical implementation of the main detector components, and the projected detector performance.

  6. Scenarios for the LHC Upgrade

    CERN Document Server

    Scandale, Walter

    2008-01-01

    The projected lifetime of the LHC low-beta quadrupoles, the evolution of the statistical error halving time, and the physics potential all call for an LHC luminosity upgrade by the middle of the coming decade. In the framework of the CARE-HHH network three principal scenarios have been developed for increasing the LHC peak luminosity by more than a factor of 10, to values above 1035 cm−2s−1. All scenarios imply a rebuilding of the high-luminosity interaction regions (IRs) in combination with a consistent change of beam parameters. However, their respective features, bunch structures, IR layouts, merits and challenges, and luminosity variation with β∗ differ substantially. In all scenarios luminosity leveling during a store would be advantageous for the physics experiments. An injector upgrade must complement the upgrade measures in the LHC proper in order to provide the beam intensity and brightness needed as well as to reduce the LHC turnaround time for higher integrated luminosity.

  7. Utilizing data grid architecture for the backup and recovery of clinical image data.

    Science.gov (United States)

    Liu, Brent J; Zhou, M Z; Documet, J

    2005-01-01

    Grid Computing represents the latest and most exciting technology to evolve from the familiar realm of parallel, peer-to-peer and client-server models. However, there has been limited investigation into the impact of this emerging technology in medical imaging and informatics. In particular, PACS technology, an established clinical image repository system, while having matured significantly during the past ten years, still remains weak in the area of clinical image data backup. Current solutions are expensive or time consuming and the technology is far from foolproof. Many large-scale PACS archive systems still encounter downtime for hours or days, which has the critical effect of crippling daily clinical operations. In this paper, a review of current backup solutions will be presented along with a brief introduction to grid technology. Finally, research and development utilizing the grid architecture for the recovery of clinical image data, in particular, PACS image data, will be presented. The focus of this paper is centered on applying a grid computing architecture to a DICOM environment since DICOM has become the standard for clinical image data and PACS utilizes this standard. A federation of PACS can be created allowing a failed PACS archive to recover its image data from others in the federation in a seamless fashion. The design reflects the five-layer architecture of grid computing: Fabric, Resource, Connectivity, Collective, and Application Layers. The testbed Data Grid is composed of one research laboratory and two clinical sites. The Globus 3.0 Toolkit (Co-developed by the Argonne National Laboratory and Information Sciences Institute, USC) for developing the core and user level middleware is utilized to achieve grid connectivity. The successful implementation and evaluation of utilizing data grid architecture for clinical PACS data backup and recovery will provide an understanding of the methodology for using Data Grid in clinical image data backup for

  8. A Primary and Backup Protection Algorithm based on Voltage and Current Measurements for HVDC Grids

    OpenAIRE

    Abedrabbo, Mudar; Van Hertem, Dirk

    2016-01-01

    DC grids are susceptible to DC side faults, which lead to a rapid rise of the DC side currents. DC side faults should be detected in a very short time before fault currents cause damage to the system or equipment, e.g., exceed the maximum interruptible limits of DC circuit breaker. This paper presents a primary and backup protective data-based algorithm. The proposed algorithm depends on the local voltage and current measurements to detect and identify various kinds of faults in the HVDC grid...

  9. Hardware in the loop simulation test platform of fuel cell backup system

    Directory of Open Access Journals (Sweden)

    Ma Tiancai

    2015-01-01

    Full Text Available Based on an analysis of voltage mechanistic model, a real-time simulation model of the proton exchange membrane (PEM fuel cell backup system is developed, and verified by the measurable experiment data. The method of online parameters identification for the model is also improved. Based on the software LabVIEW/VeriStand real-time environment and the PXI Express hardware system, the PEM fuel cell system controller hardware in the loop (HIL simulation plat-form is established. Controller simulation test results showed the accuracy of HIL simulation platform.

  10. Influence of backup bearings and support structure dynamics on the behavior of rotors with active supports

    Science.gov (United States)

    Flowers, George T.

    1995-02-01

    This semiannual status report lists specific accomplishments made on the research of the influence of backup bearings and support structure dynamics on the behavior of rotors with active supports. Papers have been presented representing work done on the T-501 engine model; an experimental/simulation study of auxiliary bearing rotordynamics; and a description of a rotordynamical model for a magnetic bearing supported rotor system, including auxiliary bearing effects. A finite element model for a foil bearing has been developed. Additional studies of rotor/bearing/housing dynamics are currently being performed as are studies of the effects of sideloading on auxiliary bearing rotordynamics using the magnetic bearing supported rotor model.

  11. The Free Open Source Backup Strategy Base on Areca Backup and Cloud Storage%基于Areca Backup和云存储的开源免费备份策略

    Institute of Scientific and Technical Information of China (English)

    周云飞

    2014-01-01

    介绍一种基于开源备份软件Areca Backup和云存储的数据备份策略。该策略充分利用云存储技术实现备份数据的低成本和高可靠性存储。Areca Backup的数据加密功能使备份文件的云存储容易符合公司的安全规定。操作简易,适用于可靠性要求一般的数据备份。%A data backup strategy that base on Areca Backup-an open-source backup software and cloud storage. It's Make full use of the superiority of the cloud storage, low cost and high reliability. The encryption function provided by Areca Backup can help cloud storage compatible with the Information security policy of the company. It's easy to user, can apply to the general lev-el of data backup.

  12. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Lee, Dong Young; Cha, Kyung Ho; Park, Won Man; Song, Soon Ja; Lee, Jung Woon; Oh, In Seok; Moon, Byung Sou; Ham, Chang Shik; Seh, Kyung Won; Joo, Young Chang; Lee, Eui Jin

    1999-12-01

    We developed techniques for upgrading nuclear power plant simulators that lost some function due to aging and obsolescence of parts. This project will provide a guidance for resolving the problems with aged simulators. We transplanted the simulation code operated in Macro-VAX II into the HP workstation with operating system version 10.20. If further research is proceeded, it will be possible to build simulator system on PCs. (author)

  13. Towards novel biogas upgrading processes

    Energy Technology Data Exchange (ETDEWEB)

    Privalova, E.

    2013-06-01

    Biogas production has considerable development possibilities not only in Finland but all over the world since it it the easiest way of creating value out of various waste fractions and represents an alternative source of renewable energy. Development of efficient biogas upgrading technology has become an important issue since it improves the quality of biogas and for example facilitating its injection into the natural gas pipelines. Moreover, such upgrading contributes to resolving the issue of increasing CO{sub 2} emissions and addresses the increasing climate change concerns. Together with traditional CO{sub 2} capturing technologies a new class of recently emerged sorbents such as ionic liquids is claimed as promising media for gas separations. In this thesis, an extensive comparison of the performance of different solvents in terms of CO{sub 2} capture has been performed. The focus of the present study was on aqueous amine solutions and their mixtures, traditional ionic liquids, 'switchable' ionic liquids and poly(ionic liquid)s in order to reveal the best option for biogas upgrading. The CO{sub 2} capturing efficiency for the most promising solvents achieved values around 50-60 L CO{sub 2}/L absorbent. These values are superior to currently widely applied water wash biogas upgrading system. Regeneration of the solvent mixtures appeared to be challenging since the loss of initial efficiency upon CO{sub 2} release was in excess of 20-40 vol %, especially in the case of aqueous amine solutions. In contrast, some of the ionic liquids displayed reversible behavior. Thus, for selected 'switchable' ionic and poly(ionic liquid)s the CO{sub 2} absorption/regeneration cycles were performed 3-4 times without any notable efficiency decrease. The viscosity issue, typical for ionic liquids upon CO{sub 2} saturation, was addressed and the information obtained was evaluated and related to the ionic interactions. The occurrence of volatile organic compounds

  14. The Nova Upgrade Facility for ICF ignition and gain

    Science.gov (United States)

    Lowdermilk, W. H.; Campbell, E. M.; Hunt, J. T.; Murray, J. R.; Storm, E.; Tobin, M. T.; Trenholme, J. B.

    1992-01-01

    Research on Inertial Confinement Fusion (ICF) is motivated by its potential defense and civilian applications, including ultimately the generation of electric power. The U.S. ICF Program was reviewed recently by the National Academy of Science (NAS) and the Fusion Policy Advisory Committee (FPAC). Both committees issued final reports in 1991 which recommended that first priority in the ICF program be placed on demonstrating fusion ignition and modest gain (G less than 10). The U.S. Department of Energy and Lawrence Livermore National Laboratory (LLNL) have proposed an upgrade of the existing Nova Laser Facility at LLNL to accomplish these goals. Both the NAS and FPAC have endorsed the upgrade of Nova as the optimal path to achieving ignition and gain. Results from Nova Upgrade Experiments will be used to define requirements for driver and target technology both for future high-yield military applications, such as the Laboratory Microfusion Facility (LMF) proposed by the Department of Energy, and for high-gain energy applications leading to an ICF engineering test facility. The central role and modifications which Nova Upgrade would play in the national ICF strategy are described.

  15. Designing a Power Supply with Multiple Input Options

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    Some electronic systems such as field communications equip-ment must be able to operate from a variety of power sources,forexample,worldwide universal AC (85—264V rms) or vehicle bat-tery power. These systems may also require backup power in casethe primary source is interrupted.The illustration shows a power supply that can operate fromthe AC line,from a 12V or 24V vehicle battery,or from an internal48V backup battery. For AC line use, a front end module accepts a

  16. Production planning and backup sourcing strategy of a buyer-dominant supply chain with random yield and demand

    Science.gov (United States)

    Chen, Kebing; Xiao, Tiaojun

    2015-11-01

    This paper studies the backup sourcing strategy of the buyer and the production planning of the supplier in presence of both random yield and random demand. Since the production is susceptible to the randomness of yield beyond the control of the supplier, the buyer may access to a backup sourcing option for the finished items. We analyse the value of backup sourcing for both the decentralised and centralised channels. Backup sourcing strategy of the buyer may lower the supply chain's performance. We show that the order quantity of the buyer does not change the stocking factor of the supplier's input. Meanwhile, compared with the centralised operation, the decentralised operation is more dependent on the backup sourcing to reduce supply shortage of the contracting supplier. From the channel's perspective, an incentive scheme is developed to facilitate the coordination of both the buyer and the contracting supplier, we show that the proposed option contract can allow the supply chain members to share the respective risks involved in the production and selling processes. Finally, we also provide qualitative insights based on numerical examples of the centralised and decentralised solutions.

  17. Visibility of children behind 2010-2013 model year passenger vehicles using glances, mirrors, and backup cameras and parking sensors.

    Science.gov (United States)

    Kidd, David G; Brethwaite, Andrew

    2014-05-01

    This study identified the areas behind vehicles where younger and older children are not visible and measured the extent to which vehicle technologies improve visibility. Rear visibility of targets simulating the heights of a 12-15-month-old, a 30-36-month-old, and a 60-72-month-old child was assessed in 21 2010-2013 model year passenger vehicles with a backup camera or a backup camera plus parking sensor system. The average blind zone for a 12-15-month-old was twice as large as it was for a 60-72-month-old. Large SUVs had the worst rear visibility and small cars had the best. Increases in rear visibility provided by backup cameras were larger than the non-visible areas detected by parking sensors, but parking sensors detected objects in areas near the rear of the vehicle that were not visible in the camera or other fields of view. Overall, backup cameras and backup cameras plus parking sensors reduced the blind zone by around 90 percent on average and have the potential to prevent backover crashes if drivers use the technology appropriately.

  18. H-1 Upgrades (4BW/4BN) (H-1 Upgrades)

    Science.gov (United States)

    2015-12-01

    Nautical Miles R&M - Reliability and Maintainability RM - Reference Model TV-1 - Technical Standards Profile Univ . - Universal H-1 Upgrades December 2015...Speed (kts) 165 165 135 139 139 Payload (Hot Day) (lbs) 3500 lbs 3500 lbs 2500 lbs 6 Wing Stations 4 Universal Under Wing Stations 3429 3429 Weapon...Stations Universal Mounts 6 6 4 4 4 Precision Guided Munitions 16 16 12 16 16 Maneuverability/Agility (G’s) -0.5 to +2.5 -0.5 to +2.5 -0.5 to +2.5 -0.5 to

  19. Tracer techniques for urine volume determination and urine collection and sampling back-up system

    Science.gov (United States)

    Ramirez, R. V.

    1971-01-01

    The feasibility, functionality, and overall accuracy of the use of lithium were investigated as a chemical tracer in urine for providing a means of indirect determination of total urine volume by the atomic absorption spectrophotometry method. Experiments were conducted to investigate the parameters of instrumentation, tracer concentration, mixing times, and methods for incorporating the tracer material in the urine collection bag, and to refine and optimize the urine tracer technique to comply with the Skylab scheme and operational parameters of + or - 2% of volume error and + or - 1% accuracy of amount of tracer added to each container. In addition, a back-up method for urine collection and sampling system was developed and evaluated. This back-up method incorporates the tracer technique for volume determination in event of failure of the primary urine collection and preservation system. One chemical preservative was selected and evaluated as a contingency chemical preservative for the storage of urine in event of failure of the urine cooling system.

  20. C-2-Upgrade Field Reversed Configuration Experiment

    Science.gov (United States)

    Smirnov, Artem

    2016-10-01

    In the C-2 field-reversed configuration (FRC) experiment, tangential neutral beam injection (20 - 40 keV hydrogen, 4 MW total), coupled with electrically-biased plasma guns at the plasma ends, magnetic end plugs, and advanced surface conditioning, led to dramatic reductions in turbulence-driven losses and greatly improved plasma stability. Under such conditions, highly reproducible FRCs with a significant fast-ion population and total plasma temperature of about 1 keV were achieved. The FRC's were macroscopically stable and decayed on characteristic transport time scales of a few milliseconds. In order to sustain an FRC configuration, the C-2 device was upgraded with a new neutral beam injection (NBI) system, which can deliver a total of 10 + MW of hydrogen beam power, by far the largest ever used in a compact toroid plasma experiment. Compared to C-2, the beam energy was lowered to 15 keV and angled injection geometry was adopted to provide better beam coupling to the FRC. The upgraded neutral beams produce a dominant fast ion population that makes a dramatic beneficial impact on the overall plasma performance. Specifically: (1) high-performance, advanced beam-driven FRCs were produced and sustained for times significantly longer (5 + ms) than all characteristic plasma decay times without the beams, (2) the sustainment is fully correlated with neutral beam injection, (3) confinement of fast ions is close to the classical limit, and (4) new, benign collective fast ion effects were observed. Collectively, these accomplishments represent a dramatic advance towards the scientific validation of the FRC-based approach to fusion. This talk will provide a comprehensive overview of the C-2U device and recent experimental advances.

  1. Advanced Accelerator Magnets for Upgrading the LHC

    CERN Document Server

    Rossi, L; de Rijk, G; Todesco, E

    2012-01-01

    The Large Hadron Collider is working at about half its design value, limited by the defective splices of the magnet interconnections. While the full energy will be attained after the splice consolidation in 2014, CERN is preparing a plan for a Luminosity upgrade (High Luminosity LHC) around 2020 and has launched a pre-study for exploring an Energy upgrade (High Energy LHC) around 2030. Both upgrades strongly rely on advanced accelerator magnet technology, requiring dipoles and quadrupoles of accelerator quality and operating fields in the 11-13 T range for the luminosity upgrade and 16-20 T range for the energy upgrade. The paper will review the last ten year of Nb3Sn accelerator magnet R&D and compare it to the needs of the upgrades and will critically assess the results of the Nb3Sn and HTS technology and the planned R&D programs also based on the inputs of first year of LHC operation.

  2. Emission system upgrades for older vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, R.R.; Finkenbiner, K.; Sommerville, R.J.

    1996-09-01

    Thirteen 1975--1980 model year vehicles were equipped with a set of components to upgrade their emission control systems. Each vehicle was tested before maintenance (as-received), after tune-up and correction of original equipment emission system defects (baseline), and after installation of the emission upgrade system (upgrade). Average emissions of non-methane hydrocarbons (NHMC), carbon monoxide (CO), and nitrogen oxides (NOx) with the emission upgrade system installed were reduced more than 60% from the baseline immediately after upgrade. Six of the vehicles accumulated 48,000 kilometers with the upgrade system. After 48,000 kilometers, average emissions of NMHC and NOx were still reduced approximately 50% compared to the baseline and average emissions of CO were reduced approximately 20%.

  3. Upgrade of the LHCb VELO detector

    Science.gov (United States)

    Williams, Mark

    2017-01-01

    The LHCb experiment is a single-arm forward spectrometer optimised for performing heavy-flavour physics analyses, using proton-proton collisions provided by the LHC machine. A major upgrade of the LHCb experiment will take place prior to the start of Run 3 operations in 2021. The upgraded Vertex Locator (VELO) is an essential component of this upgrade. Its main role is to enable high precision track and vertex reconstruction, with data-driven readout to the software trigger at 40 MHz, in the higher-luminosity environment of Run 3. To achieve this goal, significant improvements are planned with respect to the current detector, including a switch from microstrips to pixels, upgraded electronics, and a new cooling system. I will briefly motiviate the need for an upgrade, describe the main aspects of the VELO upgrade design, and show highlights of recent sensor characterisation studies using the CERN SPS test beam.

  4. [Experience of medical backup of military parade on Red Square. Authors showed data about medical backup of military personnel taking part in the parade on Red Square dedicating to anniversary of victory in the Great Patriotic War].

    Science.gov (United States)

    Malykh, A B; Iakovlev, S V; Valevskiĭ, V V

    2014-03-01

    Authors showed data about medical backup of military personnel taking part in the parade on Red Square dedicating to anniversary of Victory in the Great Patriotic War. Experience of running such events allowed to work out an algorithm for medical service: preparatory stage, training stage, running of parade, stage of move out to permanent base. During the parade on Red Square for medical care asked 18 people (participants of parade and civilians). Authors came to conclusion that as a result of medical backup of military personnel taking part in the parade no infectious and group diseases were registered.

  5. DC-DC buck converters for the CMS Tracker upgrade at SLHC

    Energy Technology Data Exchange (ETDEWEB)

    Feld, L; Jussen, R; Karpinski, W; Klein, K; Sammet, J, E-mail: Katja.Klein@cern.ch [1. Physikalisches Institut B, RWTH Aachen University, Sommerfeldstrasse 14, 52074 Aachen (Germany)

    2011-01-15

    The CMS experiment at the Large Hadron Collider (LHC) at CERN, Geneva, is planning major upgrades of its current pixel and strip detectors for the LHC luminosity upgrade, known as the SLHC. Due to the larger channel count and - in case of the strip tracker - increased functionality, the powering scheme adopted today, namely parallel powering of several detector modules, has to be abandoned. Instead, a powering scheme based on the DC-DC conversion technique is foreseen, which would lead to lower power losses in the supply cables, and would allow to reduce the material budget of cables and associated electronic boards in the sensitive detector volume. This paper deals with the development, characterisation and optimisation of DC-DC buck converter prototypes for the upgrades of the CMS pixel and strip detectors at the SLHC.

  6. Technological upgrade of static system excitation of a hydraulic generator of 700 Mwats of the Hydroelectric Power Station Guri; Actualizacion tecnologica del sistema de excitacion estatico de un generador hidraulico de 700 MVA de la Central Hidroelectrica de Guri

    Energy Technology Data Exchange (ETDEWEB)

    Contreras, Romy; Guevara, Olivia [C.V.G. Electrificacion del Caroni, C.A. (EDELCA) (Venezuela)

    2004-07-01

    The Generating Units of 700 Mwatts of the Guri Plant from EDELCA are equipped with static excitation systems of analogue technology that using the closure and field's opening switch as a mechanism for the respective processes of excitation and generator dropout. This operational pattern, although functional, has been discontinuing by existing producers because of the inconvenience involved in the management of energy stored in field generator during the dropout. Alternatively, the manufacturers employ a technique of dropout without opening the switch field, based on return to the excitation transformer the energy contained in the field generator. This paper summarizes the EDELCA initiative to upgrade technologically their Generating Units, converting the excitement and dropout switch without opening the field. The project started with a phase of preliminary tests that showed the feasibility of the change and ended with the final implementation of the new scheme in a first unit (Generator n. 15). The results were successful, covering the expectations of the company, so it was decided to continue the project, extending it to the rest of the Generating Units. (author)

  7. The Upgraded D0 Detector

    CERN Document Server

    Abazov, V M; Abolins, M; Acharya, B S; Adams, D L; Adams, M; Adams, T; Agelou, M; Agram, J L; Ahmed, S N; Ahn, S H; Ahsan, M; Alexeev, G D; Alkhazov, G; Alton, A; Alverson, G; Alves, G A; Anastasoaie, M; Andeen, T; Anderson, J T; Anderson, S; Andrieu, B; Angstadt, R; Anosov, V; Arnoud, Y; Arov, M; Askew, A; Åsman, B; Assis-Jesus, A C S; Atramentov, O; Autermann, C; Avila, C; Babukhadia, L; Bacon, Trevor C; Badaud, F; Baden, A; Baffioni, S; Bagby, L; Baldin, B; Balm, P W; Banerjee, P; Banerjee, S; Barberis, E; Bardon, O; Barg, W; Bargassa, P; Baringer, P; Barnes, C; Barreto, J; Bartlett, J F; Bassler, U; Bhattacharjee, M; Baturitsky, M A; Bauer, D; Bean, A; Baumbaugh, B; Beauceron, S; Begalli, M; Beaudette, F; Begel, M; Bellavance, A; Beri, S B; Bernardi, G; Bernhard, R; Bertram, I; Besançon, M; Besson, A; Beuselinck, R; Beutel, D; Bezzubov, V A; Bhat, P C; Bhatnagar, V; Binder, M; Biscarat, C; Bishoff, A; Black, K M; Blackler, I; Blazey, G; Blekman, F; Blessing, S; Bloch, D; Blumenschein, U; Bockenthein, E; Bodyagin, V; Böhnlein, A; Boeriu, O; Bolton, T A; Bonamy, P; Bonifas, D; Borcherding, F; Borissov, G; Bos, K; Bose, T; Boswell, C; Bowden, M; Brandt, A; Briskin, G; Brock, R; Brooijmans, G; Bross, A; Buchanan, N J; Buchholz, D; Bühler, M; Büscher, V; Burdin, S; Burke, S; Burnett, T H; Busato, E; Buszello, C P; Butler, D; Butler, J M; Cammin, J; Caron, S; Bystrický, J; Canal, L; Canelli, F; Carvalho, W; Casey, B C K; Casey, D; Cason, N M; Castilla-Valdez, H; Chakrabarti, S; Chakraborty, D; Chan, K M; Chandra, A; Chapin, D; Charles, F; Cheu, E; Chevalier, L; Chi, E; Chiche, R; Cho, D K; Choate, R; Choi, S; Choudhary, B; Chopra, S; Christenson, J H; Christiansen, T; Christofek, L; Churin, I; Cisko, G; Claes, D; Clark, A R; Clement, B; Clément, C; Coadou, Y; Colling, D J; Coney, L; Connolly, B; Cooke, M; Cooper, W E; Coppage, D; Corcoran, M; Coss, J; Cothenet, A; Cousinou, M C; Cox, B; Crepe-Renaudin, S; Cristetiu, M; Cummings, M A C; Cutts, D; Da Motta, H; Das, M; Davies, B; Davies, G; Davis, G A; Davis, W; De, K; de Jong, P; De Jong, S J; De La Cruz-Burelo, E; de La Taille, C; De Oliveira Martins, C; Dean, S; Degenhardt, J D; Déliot, F; Delsart, P A; Del Signore, K; De Maat, R; Demarteau, M; Demina, R; Demine, P; Denisov, D; Denisov, S P; Desai, S; Diehl, H T; Diesburg, M; Doets, M; Doidge, M; Dong, H; Doulas, S; Dudko, L V; Duflot, L; Dugad, S R; Duperrin, A; Dvornikov, O; Dyer, J; Dyshkant, A; Eads, M; Edmunds, D; Edwards, T; Ellison, J; Elmsheuser, J; Eltzroth, J T; Elvira, V D; Eno, S; Ermolov, P; Eroshin, O V; Estrada, J; Evans, D; Evans, H; Evdokimov, A; Evdokimov, V N; Fagan, J; Fast, J; Fatakia, S N; Fein, D; Feligioni, L; Ferapontov, A V; Ferbel, T; Ferreira, M J; Fiedler, F; Filthaut, F; Fisher, W; Fisk, H E; Fleck, I; Fitzpatrick, T; Flattum, E; Fleuret, F; Flores, R; Foglesong, J; Fortner, M; Fox, H; Franklin, C; Freeman, W; Fu, S; Fuess, S; Gadfort, T; Galea, C F; Gallas, E; Galyaev, E; Gao, M; García, C; García-Bellido, A; Gardner, J; Gavrilov, V; Gay, A; Gay, P; Gelé, D; Gelhaus, R; Genser, K; Gerber, C E; Gershtein, Yu; Gillberg, D; Geurkov, G; Ginther, G; Gobbi, B; Goldmann, K; Golling, T; Gollub, N; Golovtsov, V L; Gómez, B; Gómez, G; Gómez, R; Goodwin, R W; Gornushkin, Y; Gounder, K; Goussiou, A; Graham, D; Graham, G; Grannis, P D; Gray, K; Greder, S; Green, D R; Green, J; Green, J A; Greenlee, H; Greenwood, Z D; Gregores, E M; Grinstein, S; Gris, P; Grivaz, J F; Groer, L; Grünendahl, S; Grünewald, M W; Gu, W; Guglielmo, J; Sen-Gupta, A; Gurzhev, S N; Gutíerrez, G; Gutíerrez, P; Haas, A; Hadley, N J; Haggard, E; Haggerty, H; Hagopian, S; Hall, I; Hall, R E; Han, C; Han, L; Hance, R; Hanagaki, K; Hanlet, P; Hansen, S; Harder, K; Harel, A; Harrington, R; Hauptman, J M; Hauser, R; Hays, C; Hays, J; Hazen, E; Hebbeker, T; Hebert, C; Hedin, D; Heinmiller, J M; Heinson, A P; Heintz, U; Hensel, C; Hesketh, G; Hildreth, M D; Hirosky, R; Hobbs, J D; Hoeneisen, B; Hohlfeld, M; Hong, S J; Hooper, R; Hou, S; Houben, P; Hu, Y; Huang, J; Huang, Y; Hynek, V; Huffman, D; Iashvili, I; Illingworth, R; Ito, A S; Jabeen, S; Jacquier, Y; Jaffré, M; Jain, S; Jain, V; Jakobs, K; Jayanti, R; Jenkins, A; Jesik, R; Jiang, Y; Johns, K; Johnson, M; Johnson, P; Jonckheere, A; Jonsson, P; Jöstlein, H; Jouravlev, N I; Juárez, M; Juste, A; Kaan, A P; Kado, M; Käfer, D; Kahl, W; Kahn, S; Kajfasz, E; Kalinin, A M; Kalk, J; Kalmani, S D; Karmanov, D; Kasper, J; Katsanos, I; Kau, D; Kaur, R; Ke, Z; Kehoe, R; Kermiche, S; Kesisoglou, S; Khanov, A; Kharchilava, A I; Kharzheev, Yu M; Kim, H; Kim, K H; Kim, T J; Kirsch, N; Klima, B; Klute, M; Kohli, J M; Konrath, J P; Komissarov, E V; Kopal, M; Korablev, V M; Kostritskii, A V; Kotcher, J; Kothari, B; Kotwal, A V; Koubarovsky, A; Kozelov, A V; Kozminski, J; Kryemadhi, A; Kuznetsov, O; Krane, J; Kravchuk, N; Krempetz, K; Krider, J; Krishnaswamy, M R; Krzywdzinski, S; Kubantsev, M A; Kubinski, R; Kuchinsky, N; Kuleshov, S; Kulik, Y; Kumar, A; Kunori, S; Kupco, A; Kurca, T; Kvita, J; Kuznetsov, V E; Kwarciany, R; Lager, S; Lahrichi, N; Landsberg, G L; Larwill, M; Laurens, P; Lavigne, B; Lazoflores, J; Le Bihan, A C; Le Meur, G; Lebrun, P; Lee, S W; Lee, W M; Leflat, A; Leggett, C; Lehner, F; Leitner, R; Leonidopoulos, C; Lévêque, J; Lewis, P; Li, J; Li, Q Z; Li, X; Lima, J G R; Lincoln, D; Lindenmeyer, C; Linn, S L; Linnemann, J; Lipaev, V V; Lipton, R; Litmaath, M; Lizarazo, J; Lobo, L; Lobodenko, A; Lokajícek, M; Lounis, A; Love, P; Lü, J; Lubatti, H J; Lucotte, A; Lueking, L; Luo, C; Lynker, M; Lyon, A L; Machado, E; Maciel, A K A; Madaras, R J; Mättig, P; Magass, C; Magerkurth, A; Magnan, A M; Maity, M; Makovec, N; Mal, P K; Malbouisson, H B; Malik, S; Malyshev, V L; Manakov, V; Mao, H S; Maravin, Y; Markley, D; Markus, M; Marshall, T; Martens, M; Martin, M; Martin-Chassard, G; Mattingly, S E K; Matulik, M; Mayorov, A A; McCarthy, R; McCroskey, R; McKenna, M; McMahon, T; Meder, D; Melanson, H L; Melnitchouk, A S; Mendes, A; Mendoza, D; Mendoza, L; Meng, X; Merekov, Y P; Merkin, M; Merritt, K W; Meyer, A; Meyer, J; Michaut, M; Miao, C; Miettinen, H; Mihalcea, D; Mikhailov, V; Miller, D; Mitrevski, J; Mokhov, N; Molina, J; Mondal, N K; Montgomery, H E; Moore, R W; Moulik, T; Muanza, G S; Mostafa, M; Moua, S; Mulders, M; Mundim, L; Mutaf, Y D; Nagaraj, P; Nagy, E; Naimuddin, M; Nang, F; Narain, M; Narasimhan, V S; Narayanan, A; Naumann, N A; Neal, H A; Negret, J P; Nelson, S; Neuenschwander, R T; Neustroev, P; Nöding, C; Nomerotski, A; Novaes, S F; Nozdrin, A; Nunnemann, T; Nurczyk, A; Nurse, E; O'Dell, V; O'Neil, D C; Oguri, V; Olis, D; Oliveira, N; Olivier, B; Olsen, J; Oshima, N; Oshinowo, B O; Oteroy-Garzon, G J; Padley, P; Papageorgiou, K; Parashar, N; Park, J; Park, S K; Parsons, J; Partridge, R; Parua, N; Patwa, A; Pawloski, G; Perea, P M; Pérez, E; Peters, O; Petroff, P; Petteni, M; Phaf, L; Piegaia, R; Pleier, M A; Podesta-Lerma, P L M; Podstavkov, V M; Pogorelov, Y; Pol, M E; Pompos, A; Polosov, P; Pope, B G; Popkov, E; Porokhovoy, S; Prado da Silva, W L; Pritchard, W; Prokhorov, I; Prosper, H B; Protopopescu, S D; Przybycien, M B; Qian, J; Quadt, A; Quinn, B; Ramberg, E; Ramirez-Gomez, R; Rani, K J; Ranjan, K; Rao, M V S; Rapidis, P A; Rapisarda, S; Raskowski, J; Ratoff, P N; Ray, R E; Reay, N W; Rechenmacher, R; Reddy, L V; Regan, T; Renardy, J F; Reucroft, S; Rha, J; Ridel, M; Rijssenbeek, M; Ripp-Baudot, I; Rizatdinova, F K; Robinson, S; Rodrigues, R F; Roco, M T; Rotolo, C; Royon, C; Rubinov, P; Ruchti, R; Rucinski, R; Rud, V I; Rusakovich, N; Russo, P; Sabirov, B; Sajot, G; Sánchez-Hernández, A; Sanders, M P; Santoro, A; Satyanarayana, B; Savage, G; Sawyer, L; Scanlon, T; Schaile, A D; Schamberger, R D; Scheglov, Y; Schellman, H; Schieferdecker, P; Schmitt, C; Schwanenberger, C; Schukin, A A; Schwartzman, A; Schwienhorst, R; Sen-Gupta, S; Severini, H; Shabalina, E; Shamim, M; Shankar, H C; Shary, V; Shchukin, A A; Sheahan, P; Shephard, W D; Shivpuri, R K; Shishkin, A A; Shpakov, D; Shupe, M; Sidwell, R A; Simák, V; Sirotenko, V I; Skow, D; Skubic, P L; Slattery, P F; Smith, D E; Smith, R P; Smolek, K; Snow, G R; Snow, J; Snyder, S; Söldner-Rembold, S; Song, X; Song, Y; Sonnenschein, L; Sopczak, A; Sorin, V; Sosebee, M; Soustruznik, K; Souza, M; Spartana, N; Spurlock, B; Stanton, N R; Stark, J; Steele, J; Stefanik, A; Steinberg, J L; Steinbruck, G; Stevenson, K; Stolin, V; Stone, A; Stoyanova, D A; Strandberg, J; Strang, M A; Strauss, M; Ströhmer, R; Strom, D; Strovink, M; Stutte, L; Sumowidagdo, S; Sznajder, A; Talby, M; Tentindo-Repond, S; Tamburello, P; Taylor, W; Telford, P; Temple, J; Terentyev, N K; Teterin, V; Thomas, E; Thompson, J; Thooris, B; Titov, M; Toback, D; Tokmenin, V V; Tolian, C; Tomoto, M; Tompkins, D; Toole, T; Torborg, J; Touze, F; Towers, S; Trefzger, T; Trincaz-Duvoid, S; Trippe, T G; Tsybychev, D; Tuchming, B; Tully, C; Turcot, A S; Tuts, P M; Utes, M; Uvarov, L; Uvarov, S; Uzunyan, S; Vachon, B; Van den Berg, P J; Van Gemmeren, P; Van Kooten, R; Van Leeuwen, W M; Varelas, N; Varnes, E W; Vartapetian, A H; Vasilyev, I A; Vaupel, M; Vaz, M; Verdier, P; Vertogradov, L S; Verzocchi, M; Vigneault, M; Villeneuve-Séguier, F; Vishwanath, P R; Vlimant, J R; Von Törne, E; Vorobyov, A; Vreeswijk, M; Vu-Anh, T; Vysotsky, V S; Wahl, H D; Walker, R; Wallace, N; Wang, L; Wang, Z M; Warchol, J; Warsinsky, M; Watts, G; Wayne, M; Weber, M; Weerts, H; Wegner, M; Wermes, N; Wetstein, M; White, A; White, V; Whiteson, D; Wicke, D; Wijnen, T A M; Wijngaarden, D A; Wilcer, N; Willutzki, H; Wilson, G W; Wimpenny, S J; Wittlin, J; Wlodek, T; Wobisch, M; Womersley, J; Wood, D R; Wyatt, T R; Wu, Z; Xie, Y; Xu, Q; Xuan, N; Yacoob, S; Yamada, R; Yan, M; Yarema, R J; Yasuda, T; Yatsunenko, Y A; Yen, Y; Yip, K; Yoo, H D; Yoffe, F; Youn, S W; Yu, J; Yurkewicz, A; Zabi, A; Zanabria, M; Zatserklyaniy, A; Zdrazil, M; Zeitnitz, C; Zhang, B; Zhang, D; Zhang, X; Zhao, T; Zhao, Z; Zheng, H; Zhou, B; Zhu, J; Zielinski, M; Zieminska, D; Zieminski, A; Zitoun, R; Zmuda, T; Zutshi, V; Zviagintsev, S; Zverev, E G; Zylberstejn, A

    2005-01-01

    The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

  8. CMS upgrade and future plans

    Directory of Open Access Journals (Sweden)

    Hoepfner Kerstin

    2015-01-01

    Full Text Available CMS plans for operation at the LHC phase-II unprecedented in terms of luminosity thus resulting in serious consequences for detector performance. To achieve the goal to maintain the present excellent performance of the CMS detector, several upgrades are necessary. To handle the high phase-II data rates, the readout and trigger systems are redesigned using recent technology developments. The high particle rates will accelerate detector aging and require replacement of the tracker and forward calorimeters. In addition, the muon system will be extended.

  9. The Upgraded D0 detector

    Energy Technology Data Exchange (ETDEWEB)

    Abazov, V.M.; Abbott, B.; Abolins, M.; Acharya, B.S.; Adams, D.L.; Adams, M.; Adams, T.; Agelou, M.; Agram, J.-L.; Ahmed, S.N.; Ahn, S.H.; Ahsan, M.; Alexeev, G.D.; Alkhazov, G.; Alton, A.; Alverson, G.; Alves, G.A.; Anastasoaie, M.; Andeen, T.; Anderson, J.T.; Anderson, S.; /Buenos Aires U. /Rio de Janeiro, CBPF /Sao Paulo, IFT /Alberta U.

    2005-07-01

    The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

  10. PF-AR upgrading project

    CERN Document Server

    Kasuga, T

    2002-01-01

    The upgrading project of the dedicated pulse X-ray source PF-AR has been completed by the end of the 2001 fiscal year. Machine commissioning exclusively using the injector linac was successfully accomplished in the beginning of January 2002. After fine tuning of the machine and cleaning of the vacuum system with the beams from the middle of January to the middle of March, routine operation for users has begun in April. The historical details, commissioning and results of the project are reported. (author)

  11. South Ukraine NPP: Safety improvements through Plant Computer upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Brenman, O. [Westinghouse Electric Company, 4350 Northern Pike, Monroeville, PA 15146 (United States); Chernyshov, M. A. [Westron, LLC, 1 Acad. Proskura St., Kharkiv 61070 (Ukraine); Denning, R. S. [Battelle, 505 King Ave, Columbus, OH 43201 (United States); Kolesov, S. A. [NAEK Energoatom, 3 Vetrov Str., Kiev, 01032 (Ukraine); Balakan, H. H.; Bilyk, B. I.; Kuznetsov, V. I. [PO South Ukraine NPP, NAEK Energoatom, Mylolayv Region, 55000 (Ukraine); Trosman, G. [US Dept. of Energy, International Nuclear Safety Program, Washington, DC 20585 (United States)

    2006-07-01

    This paper summarizes some results of the Plant Computer upgrade at the Units 2 and 3 of South Ukraine Nuclear Power Plant (NPP). A Plant Computer, which is also called the Computer Information System (CIS), is one of the key safety-related systems at VVER-1000 nuclear plants. The main function of the CIS is information support for the plant operators during normal and emergency operational modes. Before this upgrade, South Ukraine NPP operated out-of-date and obsolete systems. This upgrade project wax founded by the U.S. DOE in the framework of the International Nuclear Safety Program (INSP). The most efficient way to improve the quality and reliability of information provided to the plant operator is to upgrade the Human-System Interface (HSI), which is the Upper Level (UL) CIS. The upgrade of the CIS data-acquisition system (DAS), which is the Lower Level (LL) CIS, would have less effect on the unit safety. Generally speaking, the lifetime of the LL CIS is much higher than one of the UL CIS. Unlike Plant Computers at the Western-designed plants, the functionality of the WER-1000 CISs includes a control function (Centralized Protection Testing) and a number of the plant equipment monitoring functions, for example, Protection and Interlock Monitoring and Turbo-Generator Temperature Monitoring. The new system is consistent with a historical migration of the format by which information is presented to the operator away from the traditional graphic displays, for example, Piping and Instrument Diagrams (P and ID's), toward Integral Data displays. The cognitive approach to information presentation is currently limited by some licensing issues, but is adapted to a greater degree with each new system. The paper provides some lessons learned on the management of the international team. (authors)

  12. Upgrading existing evaporators to reduce energy consumption

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    This manual is intended to assist the evaporator engineer who will be performing the technical and economic analyses to determine the most suitable evaporator upgrading technique for his particular plant. Information is included on potentials for upgrading evaporators; correctable operating factors; heat recovery and other improvements in energy use with minor capital investments; upgrading through major capital investments; guidelines for formulating an upgrading program; and new technologies encompassing advanced designs, use of solar and low-grade heat sources, and heat transfer enhancement. A 36 item bibliography is included. (LCL)

  13. Development of a gas backup heater for solar domestic hot-water systems. Final report, April 1978-April 1980

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, D.J.; Grunes, H.E.; de Winter, F.; Armstrong, P.R.

    1980-06-01

    A comprehensive program was undertaken to develop a unique gas fired backup for solar domestic hot water systems. Detailed computer design tools were written. A series of heat transfer experiments were performed to characterize the performance of individual components. A full scale engineering prototype, including the solar preheat tank and solar heat exchanger, was designed, fabricated and subjected to limited testing. Firing efficiency for the backup system was found to be 81.4% at a firing rate of 50,000 Btu/h. Long term standby losses should be negligible.

  14. ALICE Upgrades: Plans and Potentials

    CERN Document Server

    Tieulent, Raphael

    2015-01-01

    The ALICE collaboration consolidated and completed the installation of current detectors during LS1 with the aim to accumulate 1 nb$^{-1}$ of Pb-Pb collisions during Run 2 corresponding to about 10 times the Run 1 integrated luminosity. In parallel, the ALICE experiment has a rich detector upgrade programme scheduled during the second LHC long shutdown (LS2, 2018-2019) in order to fully exploit the LHC Runs 3 and 4. The main objectives of this programme are: improving the tracking precision and enabling the read-out of all Pb-Pb interactions at a rate of up to 50 kHz, with the goal to record an integrated luminosity of 10 nb$^{-1}$ after LS2 in minimum-bias trigger mode. This sample would represent an increase by a factor of one hundred with respect to the minimum-bias sample expected during Run 2. The implementation of this upgrade programme, foreseen in LS2, includes: a new low-material Inner Tracking System at central rapidity with a forward rapidity extension to add vertexing capabilities to the current M...

  15. Production of 415-ton ingots for backup rolls in the conditions of PJSC "Energomashspetsstal"

    Directory of Open Access Journals (Sweden)

    Maxim Victorovich Efimov

    2013-10-01

    Full Text Available The paper gives the results of work on melting, pouring, forging and heat treatment of 415-ton 45H3M1F steel ingots as semiproducts for manufacturing large backup rolls at the request of  «Severstal» Company. For the production of rollers, a new grade of steel based on 0.45%С and 3%Cr, additionally alloyed by Mo and V, was developed in PJSC «Energomashspetsstal» and applied in industry. Steel of bainite class provides the best combination of strength and plasticity properties. Metal was prepared by melting 7 heats in arc steel-melting furnaces with the capacity of 100 and 50 tons with subsequent out-of-furnace treatment on ladle – furnace and ladle – degassing units. The pouring of steel was carried out from four steel-pouring ladles into a vertical mould under vacuum through a tundish ladle with the protection of stream by argon. The forging of ingots was conducted on the automated 150MN forging system. The obtained billets were exposed to primary heat treatment which consisted of heating for recrystallization, isothermal soaking, in order to provide the removal of residual stresses, additional dehydrogenization to give the material lower hardness and controlled cooling for the prevention of snowflake formation. Heating of ingots for forging and preliminary heat treatment was carried out in heat treatment furnaces with the carrying capacity of up to 500 tons. For the heat treatment of the backup roll, a horizontal sprayer unit was applied. The tooling of the backup roll was executed on a lathe with one pace-plate and the final mechanical treatment was conducted on the machine-tool of Hercules NWD 1500×18000 CNC. Finished products with 225-ton mass of the following dimensions: a barrel with a diameter and a length of 2,360 mm and 4,800 mm, respectively, at a general length of 10,650 mm were obtained.  

  16. An Achromatic Telescopic Squeezing (ATS) Scheme For The LHC Upgrade

    CERN Document Server

    Fartoukh, S

    2011-01-01

    A novel optics concept has been invented and developed in the context of the LHC Upgrade studies. It offers an incredibly powerful and flexible machinery in order to squeeze β* in a symmetric or asymmetric way (so-called “round” or “flat” optics, respectively), while perfectly controlling the chromatic aberrations induced (off-momentum beta-beating, non-linear chromaticity, spurious dispersion due to the crossing angles). The basic principles of the scheme are described and a specific path for the LHC upgrade is built accordingly, only relying on the existing and well-characterized LHC-like technology, and based on the production of flat collision optics with very small β* (7.5 cm) in the plane perpendicular to the crossing plane.

  17. On-detector Electronics for the LHCb VELO Upgrade

    Science.gov (United States)

    Naik, S.

    2017-02-01

    The LHCb Experiment is designed for precision measurements of CP violation and rare decays of beauty and charm hadrons. The experiment will be upgraded to a trigger-less system reading out the full detector at a 40 MHz event rate with all selection algorithms executed in a CPU farm. The upgraded Vertex Locator will be a hybrid pixel detector read out by the VeloPix ASIC with on-chip zero-suppression. The overview of the system and the design of the VELO on-detector electronics that include the front-end hybrid, the opto-conversion and power distribution boards will be summarised. The results from the evaluation of these prototypes and further enhancement techniques will be discussed.

  18. BACKUP AND ULTIMATE HEAT SINKS IN CANDU REACTORS FOR PROLONGED SBO ACCIDENTS

    Directory of Open Access Journals (Sweden)

    T. NITHEANANDAN

    2013-10-01

    The efficacy of available backup and ultimate heat sinks, available in a CANDU 6 reactor, in mitigating the consequences of a prolonged station blackout scenario was analysed using the MAAP4-CANDU code. The analysis indicated that the steam generator secondary side water inventory is the most effective heat sink during the accident. Additional heat sinks such as the primary coolant, moderator, calandria vault water and end shield water are also able to remove decay heat; however, a gradually increasing mismatch between heat generation and heat removal occurs over the course of the postulated event. This mismatch is equivalent to an additional water inventory estimated to be 350,000 kg at the time of calandria vessel failure. In the Enhanced CANDU 6 reactor ∼2,040,000 kg of water in the reserve water tank is available for prolonged emergencies requiring heat sinks.

  19. Cassini Spacecraft In-Flight Swap to Backup Attitude Control Thrusters

    Science.gov (United States)

    Bates, David M.

    2010-01-01

    NASA's Cassini Spacecraft, launched on October 15th, 1997 and arrived at Saturn on June 30th, 2004, is the largest and most ambitious interplanetary spacecraft in history. In order to meet the challenging attitude control and navigation requirements of the orbit profile at Saturn, Cassini is equipped with a monopropellant thruster based Reaction Control System (RCS), a bipropellant Main Engine Assembly (MEA) and a Reaction Wheel Assembly (RWA). In 2008, after 11 years of reliable service, several RCS thrusters began to show signs of end of life degradation, which led the operations team to successfully perform the swap to the backup RCS system, the details and challenges of which are described in this paper. With some modifications, it is hoped that similar techniques and design strategies could be used to benefit other spacecraft.

  20. Cassini Spacecraft In-Flight Swap to Backup Attitude Control Thrusters

    Science.gov (United States)

    Bates, David M.

    2010-01-01

    NASA's Cassini Spacecraft, launched on October 15th, 1997 and arrived at Saturn on June 30th, 2004, is the largest and most ambitious interplanetary spacecraft in history. In order to meet the challenging attitude control and navigation requirements of the orbit profile at Saturn, Cassini is equipped with a monopropellant thruster based Reaction Control System (RCS), a bipropellant Main Engine Assembly (MEA) and a Reaction Wheel Assembly (RWA). In 2008, after 11 years of reliable service, several RCS thrusters began to show signs of end of life degradation, which led the operations team to successfully perform the swap to the backup RCS system, the details and challenges of which are described in this paper. With some modifications, it is hoped that similar techniques and design strategies could be used to benefit other spacecraft.

  1. Backup control airstart performance on a digital electronic engine control-equipped F100-engine

    Science.gov (United States)

    Johnson, J. B.

    1984-01-01

    The air start capability of a backup control (BUC) was tested for a digital electronic engine control (DEEC) equipped F100 engine, which was installed in an F-15 aircraft. Two air start schedules were tested. Using the group 1 start schedule, based on a 40 sec timer, an air speed of 300 knots was required to ensure successful 40 and 25% BUC mode spooldown airstarts. If core rotor speed (N2) was less than 40% a stall would occur when the start bleed closed, 40 sec after initiation of the air start. All jet fuel starter (JFS) assisted air starts were successful with the group 1 start schedule. For the group 2 schedule, the time between pressurization and start bleed closure ranged between 50 sec and 72 sec. Idle rps was lower than the desired 65% for air starts at higher altitudes and lower air speeds.

  2. Exploring the iPhone Backup made by iTunes

    Directory of Open Access Journals (Sweden)

    Mario Piccinelli

    2011-09-01

    Full Text Available The iPhone mobile from Apple Inc. is one of the most notable phones on the market thanks to its simple and user-friendly interface and ever growing pool of available high quality applications for both personal and business use. The increasing use of iPhone mobiles leads forensics practitioners towards the need for tools to access and analyze the information stored in the device. This research aims at describing how to forensically analyze a logical backup of an iPhone made by the Apple iTunes utility, understanding its structure and creating a simple tool to automate the process of decoding and analyzing the data. It was found that significant data of forensic value such as e-mail messages, text and multimedia messages, calendar events, browsing history, GPRS locations, contacts, call history and voicemail recordings can be retrieved using this method of iPhone acquisition.

  3. ATLAS Phase-II trigger upgrade

    CERN Document Server

    Sankey, Dave; The ATLAS collaboration

    2016-01-01

    This talk for ACES summarises the current status of the ATLAS Phase-II trigger upgrade, describing and comparing the two architectures under consideration, namely the two hardware level system described in the Phase-II Upgrade Scoping Document and the more recent single hardware level system.

  4. How Can China Achieve Industrial Upgrade?

    Institute of Scientific and Technical Information of China (English)

    汪建成; 毛蕴诗

    2008-01-01

    Traditional OEM enterprises are facing increasing upgrading pressure due to tighten export environment. This paper carries out a comparative case study on two bathroom hardware manufacturers,by analyzing enterprises upgrading process from OEM to ODM and OBM,this article will be a good reference for other Chinese OEM manufacturers who pursue an independent road of innovation.

  5. Alberta oil sands crudes : upgrading and marketing

    Energy Technology Data Exchange (ETDEWEB)

    Ashar, M. [Suncor Energy, Fort McMurray, AB (Canada)

    2008-05-15

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs.

  6. FTU bolometer electronic system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Pollastrone, Fabio, E-mail: fabio.pollastrone@enea.it [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy); Neri, Carlo; Florean, Marco; Ciccone, Giovanni [Associazione EURATOM-ENEA sulla Fusione, Via Enrico Fermi 45, 00044 Frascati, Rome (Italy)

    2013-10-15

    Highlights: ► Design and realization of a new bolometer electronic system. ► Many improvements over the actual commercial system. ► Architecture based on digital electronic hardware with minimal analog front end. ► Auto off-set correction, real time visualization features and small system size. ► Test results for the electronic system. -- Abstract: The FTU (Frascati Tokamak Upgrade) requires a bolometer diagnostic in order to measure the total plasma radiation. The current diagnostic architecture is based on a full analog multichannel AC bolometer system, which uses a carrier frequency amplifier with a synchronous demodulation. Taking into account the technological upgrades in the field of electronics, it was decided to realize an upgrade for the bolometric electronic system by using a hybrid analog/digital implementation. The new system developed at the ENEA Frascati laboratories has many improvements, and mainly a massive system volume reduction, a good measurement linearity and a simplified use. The new hardware system consists of two subsystems: the Bolometer Digital Control and the Bolometer Analog System. The Bolometer Digital Control can control 16 bolometer bridges through the Bolometer Analog System. The Bolometer Digital Control, based on the FPGA architecture, is connected via Ethernet with a PC; therefore, it can receive commands settings from the PC and send the stream of bolometric measurements in real time to the PC. In order to solve the cross-talk between the bridges and the cables, each of the four bridges in the bolometer head receives a different synthesized excitation frequency. Since the system is fully controlled by a PC GUI (Graphic User Interface), it is very user friendly. Moreover, some useful features have been developed, such as: auto off-set correction, bridge amplitude regulation, software gain setting, real time visualization, frequency excitation selection and noise spectrum analyzer embedded function. In this paper, the

  7. High temperature ceramic membrane reactors for coal liquid upgrading. Quarterly report No. 10, December 21, 1991--March 20, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Tsotsis, T.T.

    1992-07-01

    In this project we will study a novel process concept, i.e., the use of ceramic membrane reactors in upgrading of coal model compounds and coal derived liquids. In general terms, the USC research team is responsible for constructing and operating the membrane reactor apparatus and for testing various inorganic membranes for the upgrading of coal derived asphaltenes and coal model compounds. The USC effort will involve the principal investigator of this project and two graduate research assistants. The ALCOA team is responsible for the preparation of the inorganic membranes, for construction and testing of the ceramic membrane modules, and for measurement of their transport properties. The ALCOA research effort will involve Dr. Paul K. T. Liu, who is the project manager of the ALCOA research team, an engineer and a technician. UNOCAL`s contribution will be limited to overall technical assistance in catalyst preparation and the operation of the laboratory upgrading membrane reactor and for analytical back-up and expertise in oil analysis and materials characterization. UNOCAL is a no-cost contractor but will be involved in all aspects of the project, as deemed appropriate.

  8. Upgradable Software Product Customization by Code Query

    DEFF Research Database (Denmark)

    Vaucouleur, Sebastien

    of a subset of software systems that we call software products: software that needs special support for customization. Through customization, external companies can modify part of the original product to better t the needs of a niche market. Upon the release of a new version of the original software product......, external companies must port their customizations to the latest version of the base software product, a process called an upgrade. Companies typically consider upgrades as mandatory, and hence must bear their high cost on a regular basis. The objectives of customizability and upgradability are conicting...... this constitutes the upgrade problem. We study the upgrade problem in the eld of enterprise systems from a technical point of view, and consider the large spectrum of existing software engineering techniques for customization. We ground our work in an empirical study, that shows that customizations cannot...

  9. LHCb Upgrade: Scintillating Fibre Tracker

    Science.gov (United States)

    Tobin, Mark

    2016-07-01

    The LHCb detector will be upgraded during the Long Shutdown 2 (LS2) of the LHC in order to cope with higher instantaneous luminosities and to read out the data at 40 MHz using a trigger-less read-out system. All front-end electronics will be replaced and several sub-detectors must be redesigned to cope with higher occupancy. The current tracking detectors downstream of the LHCb dipole magnet will be replaced by the Scintillating Fibre (SciFi) Tracker. The SciFi Tracker will use scintillating fibres read out by Silicon Photomultipliers (SiPMs). State-of-the-art multi-channel SiPM arrays are being developed to read out the fibres and a custom ASIC will be used to digitise the signals from the SiPMs. The evolution of the design since the Technical Design Report in 2014 and the latest R & D results are presented.

  10. LHCb Upgrade: Scintillating Fibre Tracker

    Energy Technology Data Exchange (ETDEWEB)

    Tobin, Mark, E-mail: Mark.Tobin@epfl.ch

    2016-07-11

    The LHCb detector will be upgraded during the Long Shutdown 2 (LS2) of the LHC in order to cope with higher instantaneous luminosities and to read out the data at 40 MHz using a trigger-less read-out system. All front-end electronics will be replaced and several sub-detectors must be redesigned to cope with higher occupancy. The current tracking detectors downstream of the LHCb dipole magnet will be replaced by the Scintillating Fibre (SciFi) Tracker. The SciFi Tracker will use scintillating fibres read out by Silicon Photomultipliers (SiPMs). State-of-the-art multi-channel SiPM arrays are being developed to read out the fibres and a custom ASIC will be used to digitise the signals from the SiPMs. The evolution of the design since the Technical Design Report in 2014 and the latest R & D results are presented.

  11. Biological upgrading of coal liquids

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    Culture screening and performance studies were performed with a variety of cultures in removing nitrogen compounds from coal liquid. Two cultures were shown to be effective in removing 17 and 26 percent of the nitrogen in coal liquid as determined by elemental analysis. Experiments will continue in an effort to find additional cultures and isolates able to degrade nitrogen, as well as oxygen and sulfur as heteroatom compounds, from coal liquids. A biological process for upgrading of coal liquids would offer significant advantages, such as operation at ordinary temperature and pressure with better energy efficiency. Of greater importance is the fact that microorganisms do not require an external supply of hydrogen for heteroatom removal, obtaining required hydrogen from water. Furthermore, the biocatalysts are continuously regenerated by growth on the heteroatom compounds. Ring structures are degraded as the heteroatoms are removed. The heteroatoms are in an inocuous form, such as NH[sub 3], SO[sub 4][sup 2[minus

  12. ATLAS Nightly Build System Upgrade

    CERN Document Server

    Dimitrov, G; The ATLAS collaboration; Simmons, B; Undrus, A

    2014-01-01

    The ATLAS Nightly Build System is a facility for automatic production of software releases. Being the major component of ATLAS software infrastructure, it supports more than 50 multi-platform branches of nightly releases and provides ample opportunities for testing new packages, for verifying patches to existing software, and for migrating to new platforms and compilers. The Nightly System testing framework runs several hundred integration tests of different granularity and purpose. The nightly releases are distributed and validated, and some are transformed into stable releases used for data processing worldwide. The first LHC long shutdown (2013-2015) activities will elicit increased load on the Nightly System as additional releases and builds are needed to exploit new programming techniques, languages, and profiling tools. This paper describes the plan of the ATLAS Nightly Build System Long Shutdown upgrade. It brings modern database and web technologies into the Nightly System, improves monitoring of nigh...

  13. ATLAS Nightly Build System Upgrade

    CERN Document Server

    Dimitrov, G; The ATLAS collaboration; Simmons, B; Undrus, A

    2013-01-01

    The ATLAS Nightly Build System is a facility for automatic production of software releases. Being the major component of ATLAS software infrastructure, it supports more than 50 multi-platform branches of nightly releases and provides ample opportunities for testing new packages, for verifying patches to existing software, and for migrating to new platforms and compilers. The Nightly System testing framework runs several hundred integration tests of different granularity and purpose. The nightly releases are distributed and validated, and some are transformed into stable releases used for data processing worldwide. The first LHC long shutdown (2013-2015) activities will elicit increased load on the Nightly System as additional releases and builds are needed to exploit new programming techniques, languages, and profiling tools. This paper describes the plan of the ATLAS Nightly Build System Long Shutdown upgrade. It brings modern database and web technologies into the Nightly System, improves monitoring of nigh...

  14. Energy Efficiency Through Lighting Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Berst, Kara [Chickasaw Nation, Ada, OK (United States); Howeth, Maria [Chickasaw Nation, Ada, OK (United States)

    2013-02-26

    Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year's average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center; both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.

  15. Clinical experiences utilizing wireless remote control and an ASP model backup archive for a disaster recovery event

    Science.gov (United States)

    Liu, Brent J.; Documet, Luis; Documet, Jorge; Huang, H. K.; Muldoon, Jean

    2004-04-01

    An Application Service Provider (ASP) archive model for disaster recovery for Saint John"s Health Center (SJHC) clinical PACS data has been implemented using a Fault-Tolerant Archive Server at the Image Processing and Informatics Laboratory, Marina del Rey, CA (IPIL) since mid-2002. The purpose of this paper is to provide clinical experiences with the implementation of an ASP model backup archive in conjunction with handheld wireless technologies for a particular disaster recovery scenario, an earthquake, in which the local PACS archive and the hospital are destroyed and the patients are moved from one hospital to another. The three sites involved are: (1) SJHC, the simulated disaster site; (2) IPIL, the ASP backup archive site; and (3) University of California, Los Angeles Medical Center (UCLA), the relocated patient site. An ASP backup archive has been established at IPIL to receive clinical PACS images daily using a T1 line from SJHC for backup and disaster recovery storage. Procedures were established to test the network connectivity and data integrity on a regular basis. In a given disaster scenario where the local PACS archive has been destroyed and the patients need to be moved to a second hospital, a wireless handheld device such as a Personal Digital Assistant (PDA) can be utilized to route images to the second hospital site with a PACS and reviewed by radiologists. To simulate this disaster scenario, a wireless network was implemented within the clinical environment in all three sites: SJHC, IPIL, and UCLA. Upon executing the disaster scenario, the SJHC PACS archive server simulates a downtime disaster event. Using the PDA, the radiologist at UCLA can query the ASP backup archive server at IPIL for PACS images and route them directly to UCLA. Implementation experiences integrating this solution within the three clinical environments as well as the wireless performance are discussed. A clinical downtime disaster scenario was implemented and successfully

  16. Multi-criteria decision analysis of concentrated solar power with thermal energy storage and dry cooling.

    Science.gov (United States)

    Klein, Sharon J W

    2013-12-17

    Decisions about energy backup and cooling options for parabolic trough (PT) concentrated solar power have technical, economic, and environmental implications. Although PT development has increased rapidly in recent years, energy policies do not address backup or cooling option requirements, and very few studies directly compare the diverse implications of these options. This is the first study to compare the annual capacity factor, levelized cost of energy (LCOE), water consumption, land use, and life cycle greenhouse gas (GHG) emissions of PT with different backup options (minimal backup (MB), thermal energy storage (TES), and fossil fuel backup (FF)) and different cooling options (wet (WC) and dry (DC). Multicriteria decision analysis was used with five preference scenarios to identify the highest-scoring energy backup-cooling combination for each preference scenario. MB-WC had the highest score in the Economic and Climate Change-Economy scenarios, while FF-DC and FF-WC had the highest scores in the Equal and Availability scenarios, respectively. TES-DC had the highest score for the Environmental scenario. DC was ranked 1-3 in all preference scenarios. Direct comparisons between GHG emissions and LCOE and between GHG emissions and land use suggest a preference for TES if backup is require for PT plants to compete with baseload generators.

  17. Automatic Weather Station and Backup Techniques%自动气象站数据备份技巧

    Institute of Scientific and Technical Information of China (English)

    景新娟; 赵俊平; 刘雪芹; 杨瑞霞; 郭晓晨

    2014-01-01

    Based on the problems caused by some weather stations’ not backing up the date promptly, the paper makes an analysis on the present situation of data backup of automatic weather station and expounds in detail the methods of automatically date backup by means of sharing the date of the host and backup computers as well as using the target project. With an expectation to help automatic weather stations backup the relative data files promptly, the paper is also expected to contribute to further improve the quality of service by docking the data collector and the backup computer so as to solve such problems as data processing or data missing resulting in missing predictions and reports when the host computer is out of order.%分析了自动气象站数据备份的现状,针对台站数据备份不及时等问题,提出了通过业务主机与备份机数据共享,利用计划任务自动备份数据文件的方法。实现了自动气象站有关数据文件的及时备份,能够在主用计算机故障时实现采集器与备份机及时对接,从而解决了由于数据缺失引起的问题,为进一步提高业务质量奠定了基础。

  18. Optimal combination of energy storages for prospective power supply systems based on Renewable Energy Sources

    CERN Document Server

    Weitemeyer, Stefan; Siemer, Lars; Agert, Carsten

    2016-01-01

    Prospective power supply systems based on Renewable Energy Sources require measures to balance power generation and load at all times. The utilisation of storage devices and backup power plants is widely suggested for this purpose, whereas the best combination is still to be found. In this work, we present a modelling approach to systematically study scenarios of future power supply systems with a high share of electricity originating from wind and solar resources. By considering backup as a subordinate source of electricity with energy-only costs, the approach is independent of the actual full-load hours of the backup power plants. Applying the approach to multi-year meteorological data for Germany, cost-optimised combinations of storage devices and backup power are identified. We find that even in scenarios with significant excess generation capacities there is a need for storage devices or backup power plants with discharging power on the same order as the average load to balance the system at all times. F...

  19. Upgrade of the trigger system of CMS

    CERN Document Server

    Jeitler, Manfred

    2012-01-01

    Various parts of the CMS trigger and in particular the Level-1 hardware trigger will be upgraded to cope with increasing luminosity, using more selective trigger conditions at Level-1 and improving the reliability of the system. Many trigger subsystems use FPGAs (Field Programmable Gate Arrays) in the electronics and will benefit from developments in this technology, allowing much more logic into a single FPGA chip, thus reducing the number of chips, electronic boards and interconnections and in this way improving reliability. A number of subsystems plan to switch from the old VME bus to the new microTCA crate standard. Using similar approaches, identical modules and common software whereever possible will reduce costs and manpower requirements and improve the serviceability of the whole trigger system. The computer-farm based High-Level Trigger will not only be extended by using increasing numbers of more powerful PCs but there are also concepts for making it more robust and the software easier to maintain, ...

  20. Computer memory power control for the Galileo spacecraft

    Science.gov (United States)

    Detwiler, R. C.

    1983-01-01

    The developmental history, major design drives, and final topology of the computer memory power system on the Galileo spacecraft are described. A unique method of generating memory backup power directly from the fault current drawn during a spacecraft power overload or fault condition allows this system to provide continuous memory power. This concept provides a unique solution to the problem of volatile memory loss without the use of a battery of other large energy storage elements usually associated with uninterrupted power supply designs.

  1. Upgrades to the Polarized Neutron Reflectometer Asterix at LANSCE

    Energy Technology Data Exchange (ETDEWEB)

    Pynn, Roger

    2015-03-16

    We have upgraded the polarized neutron reflectometer, Asterix, at the Lujan Neutron Scattering Center at Los Alamos for the benefit of the research communities that study magnetic and complex-fluid films, both of which play important roles in support of the DOE’s energy mission. The upgrades to the instrument include: • A secondary spectrometer that was integrated with a Huber sample goniometer purchased with other funds just prior to the start of our project. The secondary spectrometer provides a flexible length for the scattered flight path, includes a mechanism to select among 3 alternative polarization analyzers as well as a support for new neutron detectors. Also included is an optic rail for reproducible positioning of components for Spin Echo Scattering Angle Measurement (SESAME). The entire secondary spectrometer is now non-magnetic, as required for neutron Larmor labeling. • A broad-band neutron polarizer for the incident neutron beam based on the V geometry. • A wide-angle neutron polarization analyzer • A 2d position-sensitive neutron detector • Electromagnetic coils (Wollaston prisms) for SESAME plus the associated power supplies, cooling, safety systems and integration into the data acquisition system. The upgrades allowed a nearly effortless transition between configurations required to serve the polarized neutron reflectometry community, users of the 11 T cryomagnet and users of SESAME.

  2. Upgraded cameras for the HESS imaging atmospheric Cherenkov telescopes

    Science.gov (United States)

    Giavitto, Gianluca; Ashton, Terry; Balzer, Arnim; Berge, David; Brun, Francois; Chaminade, Thomas; Delagnes, Eric; Fontaine, Gérard; Füßling, Matthias; Giebels, Berrie; Glicenstein, Jean-François; Gräber, Tobias; Hinton, James; Jahnke, Albert; Klepser, Stefan; Kossatz, Marko; Kretzschmann, Axel; Lefranc, Valentin; Leich, Holger; Lüdecke, Hartmut; Lypova, Iryna; Manigot, Pascal; Marandon, Vincent; Moulin, Emmanuel; de Naurois, Mathieu; Nayman, Patrick; Penno, Marek; Ross, Duncan; Salek, David; Schade, Markus; Schwab, Thomas; Simoni, Rachel; Stegmann, Christian; Steppa, Constantin; Thornhill, Julian; Toussnel, François

    2016-08-01

    The High Energy Stereoscopic System (H.E.S.S.) is an array of five imaging atmospheric Cherenkov telescopes, sensitive to cosmic gamma rays of energies between 30 GeV and several tens of TeV. Four of them started operations in 2003 and their photomultiplier tube (PMT) cameras are currently undergoing a major upgrade, with the goals of improving the overall performance of the array and reducing the failure rate of the ageing systems. With the exception of the 960 PMTs, all components inside the camera have been replaced: these include the readout and trigger electronics, the power, ventilation and pneumatic systems and the control and data acquisition software. New designs and technical solutions have been introduced: the readout makes use of the NECTAr analog memory chip, which samples and stores the PMT signals and was developed for the Cherenkov Telescope Array (CTA). The control of all hardware subsystems is carried out by an FPGA coupled to an embedded ARM computer, a modular design which has proven to be very fast and reliable. The new camera software is based on modern C++ libraries such as Apache Thrift, ØMQ and Protocol buffers, offering very good performance, robustness, flexibility and ease of development. The first camera was upgraded in 2015, the other three cameras are foreseen to follow in fall 2016. We describe the design, the performance, the results of the tests and the lessons learned from the first upgraded H.E.S.S. camera.

  3. Upgrading messaging system on faculty systems

    OpenAIRE

    Farkaš, Aleš

    2014-01-01

    The graduation thesis provides a solution for the transition a part of mail servers of University of Ljubljana. The transition was carried out from the Microsoft Exchange Server 2003 to Microsoft Exchange Server 2010. Next to upgrade of messaging system, the upgrade of the Active Directory carriers has been needed. For this purpose the upgrade to Windows Server 2008 R2 has been performed. In the first part of the work, the overview of the process of the MS Exchange server and Outlook clie...

  4. BEPCII Injector Linac Upgrade and Beam Instabilities

    Institute of Scientific and Technical Information of China (English)

    WANG Shu-Hong; GENG Zhe-Qiao; PEI Shi-Lun; DENG Bing-Lin; CHEN Zhi-Bi; PEI Guo-Xi; CHI Yun-Long; CHEN Yan-Wei; CAO Jian-She; KONG Xiang-Cheng; ZHAO Feng-Li; HOU Mi; LIU Wei-Bin

    2008-01-01

    The upgrade project of the Beijing Electron Positron Collider (BEPCII) and its injector linac is working well.The linac upgrade aims at a higher injection rate of 50 mA/min into the storage ring,which requires an injected beam with low emittance,low energy spread and high beam orbit and energy stabilities. This goal is finally reached recently by upgrading the linac components and by dealing with rich and practical beam physics,which are described in this study.

  5. Fermilab’s Accelerator Complex: Current Status, Upgrades and Outlook

    Energy Technology Data Exchange (ETDEWEB)

    Convery, M. E. [Fermilab

    2016-10-31

    We report on the status of the Fermilab accelerator complex, including recent performance, upgrades in progress, and plans for the future. Beam delivery to the neutrino experiments surpassed our goals for the past year. The Proton Improvement Plan is well underway with successful 15 Hz beam operation. Beam power of 700 kW to the NOvA experiment was demonstrated and will be routine in the next year. We are also preparing the Muon Campus to commission beam to the g-2 experiment.

  6. 2D electron cyclotron emission imaging at ASDEX Upgrade (invited)

    Energy Technology Data Exchange (ETDEWEB)

    Classen, I. G. J. [Max Planck Institut fuer Plasmaphysik, 85748 Garching (Germany); FOM-Institute for Plasma Physics, Rijnhuizen, 3430 BE Nieuwegein (Netherlands); Boom, J. E.; Vries, P. C. de [FOM-Institute for Plasma Physics, Rijnhuizen, 3430 BE Nieuwegein (Netherlands); Suttrop, W.; Schmid, E.; Garcia-Munoz, M.; Schneider, P. A. [Max Planck Institut fuer Plasmaphysik, 85748 Garching (Germany); Tobias, B.; Domier, C. W.; Luhmann, N. C. Jr. [University of California at Davis, Davis, California 95616 (United States); Donne, A. J. H. [FOM-Institute for Plasma Physics, Rijnhuizen, 3430 BE Nieuwegein (Netherlands); Eindhoven University of Technology, 5600 MB Eindhoven (Netherlands); Jaspers, R. J. E. [Eindhoven University of Technology, 5600 MB Eindhoven (Netherlands); Park, H. K. [POSTECH, Pohang, Gyeongbuk, 790-784 (Korea, Republic of); Munsat, T. [University of Colorado, Boulder, Colorado 80309 (United States)

    2010-10-15

    The newly installed electron cyclotron emission imaging diagnostic on ASDEX Upgrade provides measurements of the 2D electron temperature dynamics with high spatial and temporal resolution. An overview of the technical and experimental properties of the system is presented. These properties are illustrated by the measurements of the edge localized mode and the reversed shear Alfven eigenmode, showing both the advantage of having a two-dimensional (2D) measurement, as well as some of the limitations of electron cyclotron emission measurements. Furthermore, the application of singular value decomposition as a powerful tool for analyzing and filtering 2D data is presented.

  7. PERFORMANCE OF AND UPGRADES TO THE SNS COLLIMATOR SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    Plum, Michael A [ORNL; Abdou, Ashraf A [ORNL; Jacobs, Lorelei L [ORNL; Janney, Jim G [ORNL; Geoghegan, Patrick J [ORNL; McTeer, Stephen Mark [ORNL; Popova, Irina [ORNL; Ferguson, Phillip D [ORNL; Zhukov, Alexander P [ORNL

    2009-01-01

    As the Spallation Neutron Source (SNS) beam power is increased, the collimator systems are becoming correspondingly more important. The High Energy Beam Transport (HEBT) transverse collimators are now routinely used during neutron production. We are in the process of redesigning the HEBT momentum collimation system due to problems with gas production from radiolysis. The Ring collimators are designed for two-stage operation but to date they are mainly used in one-stage mode. In this paper we will discuss the status, the operational performance, and upgrades to the collimation systems.

  8. CMS Forward Pixel Upgrade Electronics and System Testing

    CERN Document Server

    Weber, Hannsjorg Artur

    2016-01-01

    This note discusses results of electronics and system testing of the CMS forward pixel (FPIX) detector upgrade for Phase 1. The FPIX detector is comprised of four stand-alone half cylinders, each of which contains frontend readout electronic boards, power regulators, cables and fibers in addition to the pixel modules. All of the components undergo rigorous testing and quality assurance before assembly into the half cylinders. Afterwards, we perform full system tests on the completely assembled half cylinders, including calibrations at final operating temperatures, characterization of the realistic readout chain, and system grounding and noise studies. The results from all these tests are discussed.

  9. BackUp: Development and evaluation of a smart-phone application for coping with suicidal crises.

    Science.gov (United States)

    Pauwels, Kirsten; Aerts, Saskia; Muijzers, Ekke; De Jaegere, Eva; van Heeringen, Kees; Portzky, Gwendolyn

    2017-01-01

    Suicide is a major public health issue and has large impact on the lives of many people. Innovative technologies such as smartphones could create new possibilities for suicide prevention, such as helping to overcome the barriers and stigma on help seeking in case of suicidal ideation. Due to their omnipresence, smartphone apps can offer suicide prevention tools very fast, they are easily-accessible, low-threshold and can help overcome some of the help-seeking barriers suicidal people experience. This article describes the development, testing and implementation of a mobile application for coping with suicidal crisis: BackUp. Based on the analysis of literature and existing suicide prevention apps several tools were identified as relevant to include in a suicide prevention app. The selected tools (a safety planning tool, a hope box, a coping cards module, and a module to reach out) are evidence based in a face to face context, and could be easily transferred into a mobile app. The testing of existing apps and the literature also revealed important guidelines for the technical development of the application. BackUp was developed and tested by an expert panel (n = 9) and a panel of end users (n = 21). Both groups rated BackUp as valuable for suicide prevention. Suicidal ideation of the end user group was measured using the Beck Scale for Suicidal Ideation before and after testing BackUp, and showed a small but non-significant decrease. The majority of the testers used BackUp several times. All tools were evaluated as rather or very useable in times of suicidal crisis. BackUp was positively evaluated and indicates that self-help tools can have a positive impact on suicidal ideation. Apps in particular create opportunities in approaching people that are not reached by traditional interventions; on the other hand they can contribute to suicide prevention in addition to regular care. However, more research is needed on the impact and effect of suicide prevention apps.

  10. GTHTR300 cost reduction through design upgrade and cogeneration

    Energy Technology Data Exchange (ETDEWEB)

    Yan, Xing L., E-mail: yan.xing@jaea.go.jp; Sato, Hiroyuki; Kamiji, Yu; Imai, Yoshiyuki; Terada, Atsuhiko; Tachibana, Yukio; Kunitomi, Kazuhiko

    2016-09-15

    Japan Atomic Energy Agency began design and development of the Gas Turbine High Temperature Reactor of 300MWe nominal output (GTHTR300) in 2001. The reactor baseline design completed three years later was based on 850 °C core outlet temperature and a direct cycle gas turbine balance of plant. It attained 45.6% net power generation efficiency and 3.5 US¢/kW h cost of electricity. The cost was estimated 20% lower than LWR. The latest design upgrade has incorporated several major technological advances made in the past ten years to both reactor and balance of plant. As described in this paper, these advances have enabled raising the design basis reactor core outlet temperature to 950 °C and increasing power generating efficiency by nearly 5% point. Further implementation of seawater desalination cogeneration is made through employing a newly-proposed multi-stage flash process. Through efficient waste heat recovery of the reactor gas turbine power conversion cycle, a large cost credit is obtained against the conventionally produced water prices. Together, the design upgrade and the cogeneration are shown to reduce the GTHTR300 cost of electricity to under 2.7 US¢/kW h.

  11. Upgrades to MINERVA control software

    Science.gov (United States)

    Wilson, Maurice; Eastman, Jason D.

    2017-01-01

    The MINiature Exoplanet Radial Velocity Array (MINERVA) is an array of four robotic telescopes located on Mt. Hopkins in Arizona that will find and characterize rocky planets around our nearest stars. We discuss the latest upgrades to the MINERVA robotic control software. Previously, our robotic control software was only capable of taking radial velocities or photometry for the entire night, but not both. We have recently increased the speed and ease of transitioning between photometry and radial velocity (RV) observations. We can now arbitrarily assign a subset of the telescopes to either photometric or spectroscopic observations. This capability enables us to monitor stellar activity while measuring the star’s RV, gather photometry on one star while continuing our RV survey of other targets and provide education and public outreach opportunities where others can observe with one or more telescopes while we continue using the remaining telescopes for research. This material is based upon work supported by the National Science Foundation Graduate Research Fellowship Program under Grant No. 1144152.

  12. Upgrade of the CMS Tracker

    CERN Document Server

    Klein, Katja

    2013-01-01

    The performance of the Tracker of the CMS experiment, comprising of a pixel and a strip detector, has so far been excellent, as reflected in the wealth of beautiful physics results from CMS. However, the foreseen increases of both the instantaneous and the integrated luminosity by the LHC during the next ten years will necessitate a stepwise upgrade of the CMS tracking detector. \\\\ In the extended end-of-year shutdown 2016/17 the pixel detector will be exchanged. The new device is designed for an instantaneous luminosity of $2\\cdot 10^{34}$\\,cm$^{-2}$s$^{-1}$ and an integrated luminosity of 500\\,fb$^{-1}$. The number of layers will be increased from three to four in the barrel part and from two to three in the end caps, thus providing four-hit coverage over the full pseudorapidity range. A smaller beampipe allows the reduction of the radius of the innermost layer, improving the tracking performance. Further improvements include a new readout chip, reduction of material, and the installation of more effi...

  13. The upgrade of the LHCb Vertex Locator

    CERN Document Server

    Bird, T

    2014-01-01

    The LHCb experiment is set for a significant upgrade, which will be ready for Run~3 of the LHC in 2020. This upgrade will allow LHCb to run at a significantly higher instantaneous luminosity and collect an integrated luminosity of $50\\,\\text{fb}^{-1}$ by the end of Run~4. In this process the Vertex locator (VELO) detector will be upgraded to a pixel-based silicon detector. The upgraded VELO will improve upon the current detector by being closer to the beam and having lower material modules with microchannel cooling and a thinner RF-foil. Simulations have shown that it will maintain its excellent performance, even after the radiation damage caused by collecting an integrated luminosity of $50\\,\\text{fb}^{-1}$.

  14. System and process for upgrading hydrocarbons

    Energy Technology Data Exchange (ETDEWEB)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  15. Physics benchmarks of the VELO upgrade

    CERN Document Server

    Eklund, Lars

    2017-01-01

    The LHCb Experiment at the LHC is successfully performing precision measurements primarily in the area of flavour physics. The collaboration is preparing an upgrade that will start taking data in 2021 with a trigger-less readout at five times the current luminosity. The vertex locator has been crucial in the success of the experiment and will continue to be so for the upgrade. It will be replaced by a hybrid pixel detector and this paper discusses the performance benchmarks of the upgraded detector. Despite the challenging experimental environment, the vertex locator will maintain or improve upon its benchmark figures compared to the current detector. Finally the long term plans for LHCb, beyond those of the upgrade currently in preparation, are discussed.

  16. Technology to Upgrade Magneto-Materials

    Institute of Scientific and Technical Information of China (English)

    2003-01-01

    @@ CAS scientists have developed a new surface-coating technology to upgrade the product quality of China's permanent magnet materials. The success is appraised by an evaluation penal of the CAS Shenyang Branch in northeastern China' s Liaoning Province.

  17. Recent Results from the IR Upgrade FEL at Jefferson Lab

    CERN Document Server

    Benson, S V; Behre, C P; Biallas, G H; Boyce, J; Douglas, D; Dylla, H F D; Evans, R; Grippo, A G; Gubeli, J G; Hardy, D; Hernandez-Garcia, C; Jordan, K; Merminga, L; Neil, G; Preble, J P; Shinn, M D; Siggins, T; Walker, R L; Williams, G P; Zhang, S

    2005-01-01

    After demonstrating 10 kW operation with 1 second pulses, the Jefferson Lab program switched to demonstrating high power operation at short wavelengths using a new 8 cm period wiggler and a THz suppression chicane. We report here on the lasing results to date using this new configuration. We have demonstrated a large reduction in THz heating on the mirrors. We have also eliminated heating in the mirror steering assemblies, making operation at high power much more stable. Finally, we have greatly reduced astigmatism in the optical cavity, allowing operation with a very short Rayleigh range. The laser has been tuned from 0.9 to 3.1 microns using the new wiggler. User experiments commenced in April of 2005 with the FEL Upgrade operating over the 1-3 micron range. We are in the process of installing a 5.5 cm permanent magnet wiggler that will give us even larger tuning range and higher power.

  18. Heat transport at the boundary of ASDEX upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Pitcher, C.S. [Massachusetts Inst. of Tech., Cambridge, MA (United States). Plasma Fusion Center; Herrmann, A.; Murmann, H.; Reimerdes, H.; Schweinzer, J.; Suttrop, W.; Salzmann, H. [Max-Planck-Institut fuer Plasmaphysik, Garching (Germany). EURATOM-IPP Association; ASDEX Upgrade Team; NBI Group

    1997-01-17

    The flow of heat in the scrape-off layer region of ASDEX Upgrade is investigated and compared with simple modelling. Parallel heat transport is found to be consistent with electron heat conduction based on Spitzer-Haerm conductivity. Cross-field heat transport is characterized using radial e-folding distances for power, temperature and plasma pressure, which are all found to vary weakly over a wide range of discharge conditions. Type I ELMs, also characterized, introduce a discreteness to the power flow into the SOL and carry approximately half of the power exhaust from the discharge. The divertor plates are effectively screened from the ELM energy, even in low radiation discharges, suggesting enhanced radiation rates during ELMs. (orig.)

  19. Heat transport at the boundary of ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Pitcher, C.S. [MIT Plasma Science and Fusion Center, Cambridge, MA (United States); Hermann, A.; Murmann, H. [IPP-EURATOM Association, Max-Planck-Inst. fuer Plasmaphysik, Garching (Germany)] [and others

    1997-07-01

    The flow of heat in the scrape-off layer (SOL) region of ASDEX Upgrade is investigated and compared with simple modelling. Parallel heat transport is found to be consistent with electron heat conduction based on Spitzer-Harm conductivity. Cross-field heat transport is characterized using radial e-folding distances for power, temperature and plasma pressure, which are all found to vary weakly over a wide range of discharge conditions. Type I ELMs, also characterized, introduce a discreteness to the power flow into the SOL and carry approximately half of the power exhaust from the discharge. The divertor plates are effectively screened from the ELM energy, even in low-radiation discharges, suggesting enhanced radiation rates during ELMs. (Author).

  20. Readout scheme of the upgraded ALICE TPC

    CERN Document Server

    Appelshaeuser, Harald; Ivanov, Marian; Lippmann, Christian; Wiechula, Jens

    2016-01-01

    In this document, we present the updated readout scheme for the ALICE TPC Upgrade. Two major design changes are implemented with respect to the concept that was presented in the TPC Upgrade Technical Design Report: – The SAMPA front-end ASIC will be used in direct readout mode. – The ADC sampling frequency will be reduced from 10 to 5 MHz. The main results from simulations and a description of the new readout scheme is outlined.

  1. Lower Hybrid System upgrade on Tore Supra

    Science.gov (United States)

    Beaumont, B.; Beunas, A.; Bibet, P.; Kazarian, F.

    2003-12-01

    An upgrade of the heating systems is in progress on Tore Supra. It is focused on the manufacturing of a new coupler, using the PAM concept as foreseen for ITER launcher, and the upgrade of the existing transmitter by replacing the 16 existing 500 kW, 210 s klystrons with new 750 kW, 1000s klystrons. Main features of the launcher and klystron are presented.

  2. Neue Anwendungsgebiete der Elektronzyklotronresonanzheizung an ASDEX Upgrade

    OpenAIRE

    Höhnle, Hendrik

    2012-01-01

    In dieser Arbeit wurden Heizszenarien der Elektronzyklotronresonanzheizung (ECRH) für neue Parametergebiete am Tokamak ASDEX Upgrade im Hinblick auf ITER entwickelt. Die ECRH wird seit dem Umbau des Materials der ersten Wand von Kohlenstoff zu Wolfram auch für die Kontrolle der Wolframkonzentration im Plasmazentrum gebraucht. In ITER-relevanten Entladungen an ASDEX Upgrade wird der Einsatz der ECRH in der üblich verwendeten außerordentlichen Mode an der zweiten Harmonischen (X2-Mode) jedoch b...

  3. Backup and Ultimate Heat Sinks in CANDU Reactors For Prolonged SBO Accidents

    Energy Technology Data Exchange (ETDEWEB)

    Nitheanandan, T.; Brown, M. J. [Atomic Energy of Canada Limited, Ontario (Canada)

    2013-10-15

    In a pressurized heavy water reactor, following loss of the primary coolant, severe core damage would begin with the depletion of the liquid moderator, exposing the top row of internally-voided fuel channels to steam cooling conditions on the inside and outside. The uncovered fuel channels would heat up, deform and disassemble into core debris. Large inventories of water passively reduce the rate of progression of the accident, prolonging the time for complete loss of engineered heat sinks. The efficacy of available backup and ultimate heat sinks, available in a CANDU 6 reactor, in mitigating the consequences of a prolonged station blackout scenario was analysed using the MAAP4-CANDU code. The analysis indicated that the steam generator secondary side water inventory is the most effective heat sink during the accident. Additional heat sinks such as the primary coolant, moderator, calandria vault water and end shield water are also able to remove decay heat; however, a gradually increasing mismatch between heat generation and heat removal occurs over the course of the postulated event. This mismatch is equivalent to an additional water inventory estimated to be 350,000 kg at the time of calandria vessel failure. In the Enhanced CANDU 6 reactor ∼2,040,000 kg of water in the reserve water tank is available for prolonged emergencies requiring heat sinks.

  4. Supporting Patients With Incurable Cancer: Backup Behavior in Multidisciplinary Cross-Functional Teams.

    Science.gov (United States)

    Huang, Fleur; Driga, Amy; LeGuerrier, Bronwen E; Schmitz, Renée; Hall-Lavoie, Debra M; Kostaras, Xanthoula; Chu, Karen P; Pituskin, Edith; Watanabe, Sharon M; Fairchild, Alysa

    2016-11-01

    Caring for patients with incurable cancer presents unique challenges. Managing symptoms that evolve with changing clinical status and, at the same time, ensuring alignment with patient goals demands specific attention from clinicians. With care needs that often transcend traditional service provision boundaries, patients who seek palliation commonly interface with a team of providers that represents multiple disciplines across multiple settings. In this case study, we explore some of the dynamics of a cross-disciplinary approach to symptom management in an integrated outpatient radiotherapy service model. Providers who care for patients with incurable cancer must rely on one another to secure delivery of the right services at the right time by the right person. In a model of shared responsibilities, flexibility in who does what and when can enhance overall team performance. Adapting requires within-team and between-team monitoring of task and function execution for any given patient. This can be facilitated by a common understanding of the purpose of the clinical team and an awareness of the particular circumstances surrounding care provision. Backup behavior, in which one team member steps in to help another meet an expectation that would otherwise not be fulfilled, is a supportive team practice that may follow naturally in high-functioning teams. Such team processes as these have a place in the care of patients with incurable cancer and help to ensure that individual provider efforts more effectively translate into improved palliation for patients with unmet needs.

  5. Upgrades of the ATLAS trigger system

    CERN Document Server

    Pastore, Francesca; The ATLAS collaboration

    2017-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. \\\\ By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions ...

  6. The ALICE Inner Tracking System Upgrade

    CERN Document Server

    Siddhanta, Sabyasachi

    2015-01-01

    The long term plan of ALICE (A Large Ion Collider Experiment) at the CERN Large Hadron Collider (LHC) is a detailed investigation and characterisation of the Quark-Gluon Plasma (QGP). ALICE has devised a comprehensive upgrade strategy to enhance its physics capabilities and to exploit the LHC running conditions after the second long shutdown of the LHC scheduled in 2019-20. The upgraded ALICE will focus on high precision measurements of rare probes over a wide range of momenta, which will significantly improve the performance with respect to the present experimental set up. The upgrade strategy is based on the fact that after LS2 LHC will progressively increase its luminosity with Pb beams eventually reaching an interaction rate of about 50 kHz. To exploit the new LHC capabilities, several existing detectors will undergo a substantial upgrade and new detectors will be added. Within this upgrade strategy, the Inner Tracking System (ITS) upgrade forms an important cornerstone, providing precise measurements for...

  7. Experimental quantification of dynamic forces and shaft motion in two different types of backup bearings under several contact conditions

    DEFF Research Database (Denmark)

    Lahriri, Said; Santos, Ilmar

    2013-01-01

    This paper treats the experimental study on a shaft impacting its stator for different cases. The paper focuses mainly on the measured contact forces and the shaft motion in two different types of backup bearings. As such, the measured contact forces are thoroughly studied. These measured contact....... The analyses show that by use of a conventional annular guide, the shaft undergoes a direct transition from normal operation to a full annular backward whirling state for the case of external excitation. However, in a self-excited vibration case, where the speed is gradually increased and decreased through...... the first critical speed, the investigation revealed that different paths initiated the onset of backward whip and whirling motion. In order to improve the whirling and the full annular contact behavior, an unconventional pinned backup bearing is realized. The idea is to utilize pin connections that center...

  8. IPNS upgrade: A feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  9. Design and performance of the collective Thomson scattering receiver at ASDEX Upgrade

    DEFF Research Database (Denmark)

    Furtula, Vedran; Salewski, Mirko; Leipold, Frank

    2012-01-01

    Here we present the design of the fast-ion collective Thomson scattering receiver for millimeter wave radiation installed at ASDEX Upgrade, a tokamak for fusion plasma experiments. The receiver can detect spectral power densities of a few eV against the electron cyclotron emission background...

  10. Upgrading a ColdFusion-Based Academic Medical Library Staff Intranet

    Science.gov (United States)

    Vander Hart, Robert; Ingrassia, Barbara; Mayotte, Kerry; Palmer, Lisa A.; Powell, Julia

    2010-01-01

    This article details the process of upgrading and expanding an existing academic medical library intranet to include a wiki, blog, discussion forum, and photo collection manager. The first version of the library's intranet from early 2002 was powered by ColdFusion software and existed primarily to allow staff members to author and store minutes of…

  11. First results of ion cyclotron resonance heating on ASDEX upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Noterdaeme, J.; Hoffmann, C.; Brambilla, M.; Buechl, K.; Eberhagen, A.; Field, A.; Fuchs, C.; Gehre, O.; Gernhardt, J.; Gruber, O.; Haas, G.; Hermann, A.; Hofmeister, F.; Kallenbach, A.; Lieder, G.; Mertens, V.; Murmann, H.; de Pena Hempel, S.; Poschenrieder, W.; Richter, T.; Ryter, F.; Salmon, N.; Salzmann, H.; Schneider, W.; Wesner, F.; Zehrfeld, H.; Zohm, H. (Max-Planck-Institute for Plasmaphysics, D-8046 Garching (Germany)); ASDEX Upgrade Team

    1994-10-15

    ASDEX Upgrade is equipped with an ICRH system consisting of 4 generators of 2 MW power each and 4 double loop antennas. The generators, tuneable in frequency from 30 to 120 MHz, cover several heating scenarios over a wide range of magnetic fields (1 T[lt]B[sub t][lt]3.9 T): minority heating of H and He[sub 3] and second harmonic heating of H and D. ICRH-heated discharges in ASDEX Upgrade were so far carried out mainly at 30 MHz and a magnetic field of 2 T (H minority in D and He). Peak powers of 2.4 MW and pulse length up to 2.5 s were achieved (total energy 3.75 MJ). In L-mode, the density on turn-on of the ICRH stays constant, or even decreases. The ratio of radiated power to total input power is unchanged (60% in an unboronized machine, 30% in a freshly boronized machine) between Ohmic and ICRH phases. The electron temperature increases with 0.9 MW from 1 to 1.25 keV, the loop voltage drops. Transitions to the H-mode were easily and reliably achieved with ICRH alone (necessary ICRH power as low as 0.9 MW) and the length of the ELMy H-mode phases was limited only by the applied ICRH pulse length (ELMy H-mode phases of up to 2 s were achieved). The paper presents further results on heating and confinement in L and H-mode, antenna and edge studies and on divertor measurements. Preliminary experiments, performed with a combination of H minority heating (30 MHz) and H second harmonic (60 MHz) in 600 kA He and D discharges (H minority in the 5 to 20% range) at 2 T, and with non-resonant heating (30 MHz and 60 MHz at 1.35 T) are briefly discussed.

  12. Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Upgrade Activities

    Science.gov (United States)

    Emrich, William J., Jr.

    2014-01-01

    Over the past year the Nuclear Thermal Rocket Element Environmental Simulator (NTREES) has been undergoing a significant upgrade beyond its initial configuration. The NTREES facility is designed to perform realistic non-nuclear testing of nuclear thermal rocket (NTR) fuel elements and fuel materials. Although the NTREES facility cannot mimic the neutron and gamma environment of an operating NTR, it can simulate the thermal hydraulic environment within an NTR fuel element to provide critical information on material performance and compatibility. The first phase of the upgrade activities which was completed in 2012 in part consisted of an extensive modification to the hydrogen system to permit computer controlled operations outside the building through the use of pneumatically operated variable position valves. This setup also allows the hydrogen flow rate to be increased to over 200 g/sec and reduced the operation complexity of the system. The second stage of modifications to NTREES which has just been completed expands the capabilities of the facility significantly. In particular, the previous 50 kW induction power supply has been replaced with a 1.2 MW unit which should allow more prototypical fuel element temperatures to be reached. The water cooling system was also upgraded to so as to be capable of removing 100% of the heat generated during. This new setup required that the NTREES vessel be raised onto a platform along with most of its associated gas and vent lines. In this arrangement, the induction heater and water systems are now located underneath the platform. In this new configuration, the 1.2 MW NTREES induction heater will be capable of testing fuel elements and fuel materials in flowing hydrogen at pressures up to 1000 psi at temperatures up to and beyond 3000 K and at near-prototypic reactor channel power densities. NTREES is also capable of testing potential fuel elements with a variety of propellants, including hydrogen with additives to inhibit

  13. STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING

    Energy Technology Data Exchange (ETDEWEB)

    Tiffany Bass, G. Davis, Christiana Wilson, Mircea Stirbet

    2012-07-01

    CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

  14. Proton Beam Intensity Upgrades for the Neutrino Program at Fermilab

    Energy Technology Data Exchange (ETDEWEB)

    Bhat, C. M. [Fermilab

    2016-12-15

    Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its primary goal to start providing 700 kW beam power on NOvA target by the end of 2017 and 2) the foreseen PIP–II will replace the existing LINAC, a 400 MeV injector to the Booster, by an 800 MeV superconducting LINAC by the middle of next decade, with output beam intensity from the Booster increased significantly and the beam power on the NOvA target increased to <1.2 MW. In any case, the Fermilab Booster is going to play a very significant role for the next two decades. In this context, we have recently developed and commissioned an innovative beam injection scheme for the Booster called "early injection scheme". This scheme is already in operation and has a potential to increase the Booster beam intensity from the PIP design goal by a considerable amount with a reduced beam emittance and beam loss. In this paper, we will present results from our experience from the new scheme in operation, current status and future plans.

  15. Incidence and prognostic significance of sustained ventricular tachycardias in heart failure patients implanted with biventricular pacemakers without a back-up defibrillator: results from the prospective, multicentre, Mona Lisa cohort study.

    Science.gov (United States)

    Boveda, Serge; Marijon, Eloi; Jacob, Sophie; Defaye, Pascal; Winter, Jobst B; Bulava, Alan; Gras, Daniel; Albenque, Jean Paul; Combes, Nicolas; Pavin, Dominique; Delarche, Nicolas; Teubl, Alexander; Lambiez, Marie; Chevalier, Philippe

    2009-05-01

    The aim of this study was to investigate the 12-month incidence, predictive factors, and prognosis of sustained ventricular tachycardia (VT) in chronic heart failure patients implanted with biventricular pacemakers without a back-up defibrillator (CRT-P), assessed by continuous intracardiac ventricular electrograms. The Mona Lisa study, a prospective, multicentre, cohort study, designed to determine the incidence of sustained VT and its prognostic impact in CRT-P recipients within the year after implant enrolled 198 patients with moderate or severe chronic heart failure, despite optimal pharmacological therapy. An independent committee reviewed the data from all arrhythmic episodes as well as causes of death according to predefined criteria. During a mean follow-up of 9.8 +/- 3.1 months after implantation, 8 patients experienced at least one episode of sustained VT [4.3%; 95% confidence interval (CI), 1.1-7.5] and 21 deaths occurred, giving a 12-month mortality rate of 11.7% (95% CI, 6.4-16.9). The presence of sustained VT was associated with a high risk of sudden cardiac death (SCD) and the lowest 12-month overall survival (P < 0.0001). The incidence of sustained VT remains relatively low in the first year after CRT-P implantation, but when present appears closely associated with short-term adverse outcomes, especially SCD. This emphasizes the possible value of remote monitoring to detect high-risk patients for urgent upgrading.

  16. Overview of ASDEX Upgrade results

    Science.gov (United States)

    A. Kallenbachthe ASDEX Upgrade Team; the EUROfusion MST1 Team

    2017-10-01

    The ASDEX Upgrade (AUG) programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. Since 2015, AUG is equipped with a new pair of 3-strap ICRF antennas, which were designed for a reduction of tungsten release during ICRF operation. As predicted, a factor two reduction on the ICRF-induced W plasma content could be achieved by the reduction of the sheath voltage at the antenna limiters via the compensation of the image currents of the central and side straps in the antenna frame. There are two main operational scenario lines in AUG. Experiments with low collisionality, which comprise current drive, ELM mitigation/suppression and fast ion physics, are mainly done with freshly boronized walls to reduce the tungsten influx at these high edge temperature conditions. Full ELM suppression and non-inductive operation up to a plasma current of {{I}\\text{p}}=0.8 MA could be obtained at low plasma density. Plasma exhaust is studied under conditions of high neutral divertor pressure and separatrix electron density, where a fresh boronization is not required. Substantial progress could be achieved for the understanding of the confinement degradation by strong D puffing and the improvement with nitrogen or carbon seeding. Inward/outward shifts of the electron density profile relative to the temperature profile effect the edge stability via the pressure profile changes and lead to improved/decreased pedestal performance. Seeding and D gas puffing are found to effect the core fueling via changes in a region of high density on the high field side (HFSHD). The integration of all above mentioned operational scenarios will be feasible and naturally obtained in a large device where the edge is more opaque for neutrals and higher plasma temperatures provide a lower collisionality. The combination of exhaust control with pellet fueling has been successfully

  17. Upgrading of the LGD cluster at JINR to support DLNP experiments

    Science.gov (United States)

    Bednyakov, I. V.; Dolbilov, A. G.; Ivanov, Yu. P.

    2017-01-01

    Since its construction in 2005, the Computing Cluster of the Dzhelepov Laboratory of Nuclear Problems has been mainly used to perform calculations (data analysis, simulation, etc.) for various scientific collaborations in which DLNP scientists take an active part. The Cluster also serves to train specialists. Much has changed in the past decades, and the necessity has arisen to upgrade the cluster, increasing its power and replacing the outdated equipment to maintain its reliability and modernity. In this work we describe the experience of performing this upgrading, which can be helpful for system administrators to put new equipment for clusters of this type into operation quickly and efficiently.

  18. MAST-Upgrade Divertor Facility and Assessing Performance of Long-Legged Divertors

    CERN Document Server

    Fishpool, G; Cunningham, G; Harrison, J; Katramados, I; Kirk, A; Kovari, M; Meyer, H; Scannell, R

    2013-01-01

    A potentially important feature in a divertor design for a high-power tokamak is an extended and expanded divertor leg. The upgrade to MAST will allow a wide range of such divertor leg geometries to be produced, and hence will allow the roles of greatly increased connection length and flux expansion to be experimentally tested. This will include testing the potential of the Super-X configuration [1]. The design process for the upgrade has required analysis of producing and controlling the magnetic configurations, and has included consideration of the roles that divertor closure and increasing magnetic connection length will play.

  19. Development of DC-DC converters for the upgrade of the CMS pixel detector

    Energy Technology Data Exchange (ETDEWEB)

    Feld, Lutz; Karpinski, Waclaw; Klein, Katja; Sammet, Jan; Wlochal, Michael [RWTH Aachen University (Germany)

    2012-07-01

    Around 2017, the pixel detector of the CMS experiment at LHC will be upgraded. The amount of current that has to be provided to the front-end electronics is expected to increase by a factor of two. Since the space available for cables is limited, this would imply unacceptable power losses in the available supply cables. Therefore it is foreseen to place DC-DC converters close to the front-end electronics, allowing to provide the power at higher voltages and thereby to facilitate the supply of the required currents with the present cable plant. The talk introduces the foreseen powering scheme of the pixel upgrade and summarizes the results of system test measurements with CMS pixel sensor modules, radiation tolerant DC-DC converters and the full power supply chain of the pixel detector. In addition, measurements of the converter efficiency and performance before, after and during thermal cycling are presented.

  20. Reducing CO2 emission from bitumen upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, John

    2011-07-15

    The treatment of sand oil can result in significant CO2 emission. Ceramatec Inc. has developed a technology to reduce the emission of CO2 during the upgrading of feedstocks bearing heteroatoms. This technology can be applied to kerogen derived oil (shale oil) and heavy oil as well as to bitumen from oil sands. Metallic sodium is used as the reducing and heteroatom scavenging agent. Hydrogen, methane or other hydrocarbons may be used to cap radicals formed in the process. But using methane can lead to lower material and capital costs, greater product yield, and lower CO2 emission. During the upgrading process, the aromatic constituents remain in the product, after treatment with sodium and removal of sulphur, nitrogen and metals. Aromatic saturation is not required with sodium, so less hydrogen is needed which leads to reduced CO2 emission. The reason is that CO2 is emitted in the steam methane reforming (SMR) process where hydrogen is produced. An example is introduced to demonstrate the reduction of CO2 emission from hydrogen production. Another advantage of the sodium/methane upgrading process is the incorporation of methane into the fuel. In addition, the total acid number, TAN, becomes negligible in the sodium upgrading processes. Ceramatec has also developed a process for the recovery of sodium from the sodium salts generated in the sodium/methane upgrading process.

  1. BACKUP AND RECOVERY OF HP-UX OPERATING SYSTEM%HP-UX 操作系统备份及恢复

    Institute of Scientific and Technical Information of China (English)

    刘振

    2015-01-01

    In this paper we address the whole backup and recovery process of HP-UX operating system in terms of system backup and recovery,and bring forward a new system backup strategy,namely key-full backup strategy,in combination with work practices.In end of the paper,we expound the specific implementation of the key-full backup strategy and the whole backup and recovery process of HP-UX operating system via application instances.%从系统备份及恢复的角度论述了 HP-UX 操作系统备份恢复的整个过程,并结合工作实际提出一种新的系统备份策略———点面备份策略。最后通过应用实例论述了点面备份策略的具体实现以及 HP-UX 操作系统的整个备份及恢复过程。

  2. Successful upgrading under pressure of time; Unter Zeitdruck erfolgreich modernisiert

    Energy Technology Data Exchange (ETDEWEB)

    Haas, M. [Sulzer Hydro AG, Zurich (Switzerland); Gislason, G. [Landsvirkjun (Iceland)

    1998-07-01

    Burfell power station in Iceland is an excellent example of comprehensive upgrading thanks to partnerly relations between customer and supplier. This project has proved that runner replacement should not be treated individually in hydroelectric power plant modernizations, but as part of an overall refurbishing concept. To shorten delivery times, some innovative development and manufacturing methods were introduced. (orig.) [Deutsch] Das Kraftwerk Burfell in Island ist ein Beispiel fuer einen Umbau mit gesamtheitlicher Betrachtung und einer partnerschaftlichen Beziehung zwischen Kunde und Lieferant. Das Projekt hat bewiesen, dass beim Umbau von Wasserkraftwerken ein Laufradersatz nicht isoliert betrachtet werden darf, sondern in ein Gesamtkonzept innerhalb der bestehenden Anlage einzubinden ist. Zur Verkuerzung der Lieferzeiten wurden neue Wege in der Entwicklung und Fertigung der Komponenten beschritten. (orig.)

  3. A new FEBIAD-type ion source for the upgrade of SPIRAL1 at GANIL

    Energy Technology Data Exchange (ETDEWEB)

    Chauveau, P., E-mail: pierre.chauveau@ganil.fr [Grand Accélerateur National d’Ions Lourds (GANIL), CEA/DSM-CNRS/IN2P3, Bvd Henri Becquerel, 14076 Caen (France); Delahaye, P.; Babo, M.; Bouzomita, H.; Bajeat, O.; Dubois, M.; Frigot, R.; Grinyer, G.F.; Grinyer, J.; Jardin, P.; Leboucher, C.; Maunoury, L. [Grand Accélerateur National d’Ions Lourds (GANIL), CEA/DSM-CNRS/IN2P3, Bvd Henri Becquerel, 14076 Caen (France); Seiffert, C.; Stora, T. [CERN/ISOLDE, CH1211 Geneve 23 (Switzerland); Thomas, J.C. [Grand Accélerateur National d’Ions Lourds (GANIL), CEA/DSM-CNRS/IN2P3, Bvd Henri Becquerel, 14076 Caen (France); Traykov, E. [Institut Pluridisciplinaire Hubert Curien, 23, rue du Loess, Strasbourg (France)

    2016-06-01

    The SPIRAL facility at GANIL is being upgraded with a new FEBIAD ion source in order to extend its production capabilities to condensable elements. The coupling of such an ion source with the present GANIL target was recently tested online at SPIRAL at nominal power (1200 W). The results are promising as the calculated yields are in the range of those extrapolated from previous measurements at lower power and sometimes higher. This experiment and its results are presented.

  4. Innovative low-mass cooling systems for the ALICE ITS Upgrade detector at CERN

    CERN Document Server

    Gomez Marzoa, Manuel

    The Phase-1 upgrade of the LHC to full design luminosity, planned for 2019 at CERN, requires the modernisation of the experiments around the accelerator. The Inner Tracking System (ITS), the innermost detector at the ALICE experiment, will be upgraded by replacing the current apparatus by new silicon pixels arranged in 7 cylindrical layers. Each layer is composed by multiple independent modules, named staves, which provide mechanical support and cooling to the chips. This thesis aims to develop and validate experimentally an ultra-lightweight stave cooling system for the ITS Upgrade. The moderate thermal requirements, with a nominal power density of 0.15 W/cm^2 and a maximum chip temperature of 30ºC, are counterweighted by extreme low-mass restrictions, obliging to resort to lightweight, non-metallic materials, such as carbon fibre-reinforced polymers and plastics. Novel lightweight stave concepts were developed and experimentally validated, meeting the thermal requirements with minimal material inventory. T...

  5. Dynamic Biogas Upgrading for Integration of Renewable Energy from Wind, Biomass and Solar

    DEFF Research Database (Denmark)

    Jurgensen, Lars

    The Sabatier process is investigated as a storage scheme for renewable energy. Hydrogen derived from fluctuating renewable energy sources like wind and solar is converted to methane by the hydrogenation/methanation of carbon oxides. Biogas from anaerobic digestion is considered in this study...... as a high concentrated source of carbon dioxide. By using the Sabatier process, the CO2 content of the biogas is converted to CH4, which is a new upgrading process for biogas. By switching between (i) this upgrading process during periods of extensive electricity production from wind and solar, and (ii......) combined heat and power production from biogas during periods of electricity demand, bioenergy utilization becomes a dynamic process. In such a process scheme, biomass, wind, and solar could be integrated in a local context. This thesis aims to demonstrate the feasibility of the dynamic biogas upgrading...

  6. Thes - Website for Thermal Shields Upgrade Management

    CERN Document Server

    Micula, Adina

    2013-01-01

    There are a total of 1695 thermal shields (TS) in the interconnections between the superconducting magnets. During LHC Long Shutdown 1 (LS1) all of these TS are being upgraded with a new fixation design. This procedure involves the transport of all the TS from LHC to a workshop on the surface where they are being modified and the subsequent transport of the upgraded TS back to the tunnel where they are laid on the cryostats and await the closure of the interconnection. These operations have to be carefully coordinated in order to ensure that there are always enough modified TS to satisfy the demand in the tunnel and respect the time constraint imposed by the schedule of LS1. As part of my summer project, I developed a database driven website whose aim is to enable the TS upgrade monitoring.

  7. Tracking triggers for the upgraded DOe detector

    Energy Technology Data Exchange (ETDEWEB)

    Glenn, S. [California Univ., Davis (United States); Bloom, P. [California Univ., Davis (United States); Mani, S. [California Univ., Davis (United States); Pellett, D. [California Univ., Davis (United States); Costa, J. [CBPF/LAFEX, Rio de Janeiro (Brazil); Moreira, L. [CBPF/LAFEX, Rio de Janeiro (Brazil); Baumbaugh, A. [Fermi National Accelerator Laboratory, Batavia, IL (United States); Blazey, G. [Fermi National Accelerator Laboratory, Batavia, IL (United States); Borcherding, F. [Fermi National Accelerator Laboratory, Batavia, IL (United States); Johnson, M. [Fermi National Accelerator Laboratory, Batavia, IL (United States); Wilcox, J. [Northeastern University, Boston, MA (United States)

    1995-06-01

    The high luminosity environment of the upgraded Tevatron will require not only the upgrade of various DOe subdetectors, but the trigger system as well. With respect to the present system, the upgraded trigger system must operate faster and provide a higher degree of background rejection while extending the physics acceptance beyond that of the current system. This will be accomplished in part by incorporating the scintillating fiber tracker and the preshower detector into the Level 1 trigger. Track logic, implemented in commercial FPGAs, will be used to identify tracks in the scintillating fiber tracker with P{sub T}>1.5 GeV/c and electron candidates in the preshower detector. Integration of the trigger logic and readout electronics permits the identification of all tracks in a few hundred nanoseconds. Here, preliminary designs for the readout and trigger electronics are presented along with simulation results for trigger efficiencies and rejection factors. (orig.).

  8. Upgrade of the ALICE Inner Tracking System

    CERN Document Server

    Belikov, Iouri

    2016-01-01

    A Large Ion Collider Experiment (ALICE) is built to study the properties of the strongly interacting matter created in heavy-ion collisions at the LHC. With the upgrade of its Inner Tracking System (ITS), the ALICE experiment is going to increase the rate of data taking by almost two orders of magnitude. At the same time, the precision of secondary vertex reconstruction will become by at least a factor 3 better than it currently is. In this talk, we briefly show some selected physics results motivating the upgrade of the ITS, describe the design goals and the layout of the new detector, and highlight a few important measurements that will be realized after the completion of this upgrade.

  9. Microbial biocatalyst developments to upgrade fossil fuels.

    Science.gov (United States)

    Kilbane, John J

    2006-06-01

    Steady increases in the average sulfur content of petroleum and stricter environmental regulations concerning the sulfur content have promoted studies of bioprocessing to upgrade fossil fuels. Bioprocesses can potentially provide a solution to the need for improved and expanded fuel upgrading worldwide, because bioprocesses for fuel upgrading do not require hydrogen and produce far less carbon dioxide than thermochemical processes. Recent advances have demonstrated that biodesulfurization is capable of removing sulfur from hydrotreated diesel to yield a product with an ultra-low sulfur concentration that meets current environmental regulations. However, the technology has not yet progressed beyond laboratory-scale testing, as more efficient biocatalysts are needed. Genetic studies to obtain improved biocatalysts for the selective removal of sulfur and nitrogen from petroleum provide the focus of current research efforts.

  10. Design and delivery of beam monitors for the energy-upgraded linac in J-PARC

    Science.gov (United States)

    Miura, Akihiko; Ouchi, Nobuo; Oguri, Hidetomo; Hasegawa, Kazuo; Miyao, Tomoaki; Ikegami, Masanori

    2015-02-01

    In the J-PARC (Japan Proton Accelerator Research Complex) linac, an energy-upgrade project has started to achieve a design beam power of 1 MW at the exit of the downstream synchrotron. To account for the significant beam parameter upgrades, we will use the newly-fabricated beam monitors for the beam commissioning. This paper discusses the design and assembly of the beam position monitor, phase monitor, current monitor, transverse profile monitor, and beam loss monitor for the energy-upgraded linac. We periodically installed the newly-fabricated monitors for the upgraded beam line, as well as for longitudinal matching, because of the frequency jump between the original RF cavity and the newly-developed cavity. We employed two debunchers to correct for momentum spread and jitter. To account for the new debunchers, we fabricated and installed additional pairs of phase monitors in order to tune the debunchers to the adequate RF set point. Finally, we propose commissioning plans to support the beam monitor check. We will begin to establish the 181-MeV operation to confirm the proper functioning of beam monitors. Herein, we will examine the response to changes of the knobs that control the quadrupole magnets after the energy upgrade. After proper functioning of the beam monitors is confirmed, we will use the new beam monitors to establish the 400-MeV acceleration operation.

  11. CMS DT Upgrade The Sector Collector Relocation

    CERN Document Server

    Navarro Tobar, Alvaro

    2015-01-01

    The Sector Collector relocation is the first stage of the upgrade program for the Drift Tubes subdetector of the CMS experiment. It was accomplished during Long Shutdown 2013-2014, and consisted in the relocation of the second-level trigger and readout electronics from the experimental to the service cavern, relieving the environmental constraints and improving accessibility for maintenance and upgrade. Extending the electrical links would degrade reliability, so the information is converted to optical with a custom system capable of dealing with the DC-unbalanced data. Initially, present electronics are used, so optical-to-copper conversion has also been installed.

  12. Take control of upgrading to Snow Leopard

    CERN Document Server

    Kissell, Joe

    2009-01-01

    Installing a major new version of Mac OS X should be exciting and fun, but without proper guidance you may find it nerve-wracking or even risk losing valuable files. Fortunately, many thousands of people have upgraded Mac OS X calmly and successfully with Joe Kissell's previous best-selling Take Control of Upgrading... titles. Joe's friendly, expert steps-developed over innumerable test installations-help you to avoid trouble, understand what's going on when you install Snow Leopard, and easily recover from problem

  13. The upstream tracker for the LHCb upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Steinkamp, Olaf, E-mail: olafs@physik.uzh.ch

    2016-09-21

    The LHCb collaboration is planning a comprehensive upgrade of the experiment for the long shutdown of the LHC in 2019/20. As part of this upgrade, the tracking station in front of the LHCb dipole magnet will be replaced by a new planar four-layer silicon micro-strip detector with 40 MHz readout and silicon sensors with finer granularity and improved radiation hardness. Key design aspects of this new Upstream Tracker are described and a brief overview of the status of the project is given.

  14. Colorado River Sewer System Joint Venture to Upgrade Wastewater System

    Science.gov (United States)

    SAN FRANCISCO -Today, the Colorado River Sewer System Joint Venture, located in Parker, Ariz. entered into an agreement with the EPA to upgrade their wastewater treatment system to meet stringent water quality standards. The cost of the upgrade is ap

  15. Performance of Upgraded Cooling System for Lhd Helical Coils

    Science.gov (United States)

    Hamaguchi, S.; Imagawa, S.; Obana, T.; Yanagi, N.; Moriuchi, S.; Sekiguchi, H.; Oba, K.; Mito, T.; Motojima, O.; Okamura, T.; Semba, T.; Yoshinaga, S.; Wakisaka, H.

    2008-03-01

    Helical coils of the Large Helical Device (LHD) are large scale superconducting magnets for heliotron plasma experiments. The helical coils had been cooled by saturated helium at 4.4 K, 120 kPa until 2005. An upgrade of the cooling system was carried out in 2006 in order to improve the cryogenic stability of the helical coils and then it has been possible to supply the coils with subcooled helium at 3.2 K, 120 kPa. A designed mass flow of the supplied subcooled helium is 50 g/s. The subcooled helium is generated at a heat exchanger in a saturated helium bath. A series of two centrifugal cold compressors with gas foil bearing is utilized to lower the helium pressure in the bath. The supplied helium temperature is regulated by rotational speed of the cold compressors and power of a heater in the bath. The mass flow of the supplied helium is also controlled manually by a supply valve and its surplus is evaporated by ten heaters at the outlet above the coils. In the present study, the performance of the cooling system has been investigated and a stable operating method has also developed. As the result, it was confirmed that the performance of the upgraded cooling system satisfies the requirements.

  16. Tests of the CMS Phase 1 Upgrade FPIX Half Cylinders

    Science.gov (United States)

    Chen, Xuan; CMS Collaboration

    2017-01-01

    The pixel detector is an integral part of the CMS silicon tracker, designed to measure the position and momentum of charged particles produced in high-energy collisions at the Large Hadron Collider (LHC). The phase 1 upgrade of the CMS forward pixel detector will replace the existing forward pixel detector at the end of 2016. This upgrade will include three forward disks on each end, and is organized in four mechanical support structures, called half-cylinders. Each half-cylinder contains frontend readout electronic boards, power regulators, cables and fibers in addition to the three half disks with the active pixel modules. Full system tests are being performed on the half cylinders after each step of assembly and after its completion. I will describe the various steps of the testing and qualification procedure, focusing on the final assembly and the full system test for the integrated half-cylinder. I will also discuss the results obtained for the completed detector before its shipment to CERN.

  17. A new strips tracker for the upgraded ATLAS ITk detector

    CERN Document Server

    David, Claire; The ATLAS collaboration

    2017-01-01

    The inner detector of the present ATLAS detector has been designed and developed to function in the environment of the present Large Hadron Collider (LHC). At the next-generation tracking detector proposed for the High Luminosity LHC (HL-LHC), the so-called ATLAS Phase-II Upgrade, the particle densities and radiation levels will be higher by as much as a factor of ten. The new detectors must be faster, they need to be more highly segmented, and covering more area. They also need to be more resistant to radiation, and they require much greater power delivery to the front-end systems. At the same time, they cannot introduce excess material which could undermine performance. For those reasons, the inner tracker of the ATLAS detector must be redesigned and rebuilt completely. The design of the ATLAS Upgrade inner tracker (ITk) has already been defined. It consists of several layers of silicon particle detectors. The innermost layers will be composed of silicon pixel sensors, and the outer layers will consist of s...

  18. The Phase II Upgrade of the ATLAS Calorimeter

    CERN Document Server

    Tartarelli, Giuseppe Francesco; The ATLAS collaboration

    2017-01-01

    This presentation will show the status of the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC). For the HL-LHC, the instantaneous luminosity is expected to increase up to L ≃ 7.5 × 1034 cm−2 s−1 and the average pile-up up to 200 interactions per bunch crossing. The Liquid Argon (LAr) calorimeter electronics will need to be replaced to cope with these challenging conditions: the expected radiation doses will indeed exceed the qualification range of the current readout system, and the upgraded trigger system will require much longer data storage in the electronics (up to 60 us), that the current system cannot sustain. The status of the R&D of the low-power ASICs (pre-amplifier, shaper, ADC, serializer and transmitters) and of the readout electronics design will be discussed. Moreover, a High Granularity Timing Detector (HGTD) is proposed to be added in front of the LAr calorimeters in the end-cap region (2.4 <|eta|< 4.2) for pile-up mitigation a...

  19. A Wideband Digital Back-End for the Upgraded GMRT

    Science.gov (United States)

    Reddy, Suda Harshavardhan; Kudale, Sanjay; Gokhale, Upendra; Halagalli, Irappa; Raskar, Nilesh; de, Kishalay; Gnanaraj, Shelton; Ajith Kumar, B.; Gupta, Yashwant

    Traditionally, back-ends for radio telescopes have been built using a hardware-based approach with ASICs, FPGAs, etc. With advancements in processing power of CPUs, software-based systems have emerged as an alternative option, which has received additional impetus with the advent of GPU-based computing. We present here the design of a hybrid system combining the best of FPGAs, CPUs and GPUs, to implement a next generation back-end for the upgraded GMRT. This back-end can process 400 MHz bandwidth signals from 32 dual-polarized antennas, for both interferometry and beamformer applications, including narrowband spectral line modes for the interferometer, incoherent array and phased array mode of operations for the beamfomer, and also a voltage mode attached to a real-time coherent dedispersion system for the beamformer. We describe in detail the design and architecture of this system, including the novel features and capabilities. We also present sample results from the system that validate its performance in conjunction with the entire receiver chain of the upgraded GMRT.

  20. Pilot System for the Phase 1 Pixel Upgrade

    CERN Document Server

    AUTHOR|(CDS)2072269

    2015-01-01

    The CMS phase 1 pixel upgrade is planned for installation in 2016-2017, incorporating new front-end ASICs with digital 400 Mbps data links to handle a higher instantaneous luminosity of up to 2.5 $x$ 10$^{34}$ cm$^{-2}$ s$^{-1}$ and trigger rates of 100 kHz with bunch spacing scenarios of 25 or 50 ns. The new digital readout requires new back-end electronics incorporating faster optical receivers and firmware for decoding the new data format. Additionally the phase 1 upgrade is powered from DC-DC converters installed inside CMS close to the modules. To gain experience with this new readout chain and DC-DC converters under realistic operating conditions (trigger rates, backgrounds, high data occupancy, and possible single-event upsets) a pilot detector system comprising eight sensor modules, service electronics, optical links, and back-end electronics has been prepared using pre-production parts. The pilot system was installed with the present forward pixel detector in 2014 during long shutdown 1 (LS1). The pi...

  1. Laser Guide Star Facility Upgrade

    Science.gov (United States)

    Lewis, S.; Calia, D. B.; Buzzoni, B.; Duhoux, P.; Fischer, G.; Guidolin, I.; Haimerl, A.; Hackenberg, W.; Hinterschuster, R.; Holzlöhner, R.; Jolley, P.; Pfrommer, T.; Popovic, D.; Alvarez, J.-L.; Beltran, J.; Girard, J.; Pallanca, L.; Riquelme, M.; Gonte, F.

    2014-03-01

    The Laser Guide Star Facility is part of VLT Unit Telescope 4 and provides a single centre-launched sodium beacon for the two adaptive optics instruments SINFONI and NACO. The original facility, installed in 2006, employed a high-power dye laser source, PARSEC, producing an output beam that was delivered via a single-mode optical fibre to launch optics located behind the telescope secondary mirror. We recently installed a new prototype laser source, PARLA, based on Raman optical fibre technology. Requirements for the new laser include start-up times compatible with flexible observing, an output beam appropriate for the existing fibre-delivery system and an on-sky power of up to 7 watts. This is the first time that this type of laser has been deployed at a major observing facility, and it has a pathfinder role for future adaptive optics systems. Reported here are the main results of the development, deployment and early operation since the resumption of science operation in February 2013.

  2. Academic Training - LHC luminosity upgrade: detector challenges

    CERN Multimedia

    Françoise Benz

    2006-01-01

    ACADEMIC TRAINING LECTURE SERIES 13, 14, 15, March, from 11:00 to 12:00 - 16 March from 10:00 to 12:00 Main Auditorium, bldg. 500 on 14, 15 March, Council Room on 13, 16 March LHC luminosity upgrade: detector challenges A. De Roeck / CERN-PH, D. Bortoletto / Purdue Univ. USA, R. Wigmans / Texas, Tech Univ. USA, W. Riegler / CERN-PH, W. Smith / Wisconsin Univ. USA The upgrade of the LHC machine towards higher luminosity (1035 cm-2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector ...

  3. PC Made Easy: Upgrading Computer Collections.

    Science.gov (United States)

    Hannigan, Matt

    1997-01-01

    Provides guidelines for ordering the best computer books, geared to the library's size. Covers series, articles, subjects, and publishers most useful to a broad audience, as well as the best places to seek information on new titles and where to find reviews. Offers time savers for upgrading a computer book collection and discusses weeding…

  4. ATLAS Upgrades Towards the High Luminosity LHC

    CERN Document Server

    Zhu, H; The ATLAS collaboration

    2012-01-01

    After successful LHC operation at the center-of-mass energy of 7 TeV in 2011, the LHC is scheduled to deliver even more data in 2012 at 8 TeV. Meanwhile, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about 300fb-1 expected for LHC running to 3000 fb-1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon ...

  5. ATLAS Upgrades Towards the High Luminosity LHC

    CERN Document Server

    Cinca, D; The ATLAS collaboration

    2014-01-01

    After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data a...

  6. ATLAS Upgrades Towards the High Luminosity LHC

    CERN Document Server

    Elsing, M; The ATLAS collaboration

    2012-01-01

    After successful LHC operation at 7 TeV in 2011, the LHC is scheduled to deliver even more data in 2012. Meanwhile, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about 300 fb-1 expected for LHC running to 3000 fb-1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers...

  7. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5x compared to the design luminosity (10^34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade is expected to happen around 2023. The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 ...

  8. Energy upgrading measures improve also indoor climate

    DEFF Research Database (Denmark)

    Foldbjerg, Peter; Knudsen, Henrik Nellemose

    2014-01-01

    to increase the number of homeowners who venture into a major energy upgrading of their house, the demonstrated positive side effects, more than energy savings, should be included in the communication to motivate homeowners. The barriers should be reduced by “taking the homeowners by the hand” and helping...

  9. Academic Training - LHC luminosity upgrade: detector challenges

    CERN Multimedia

    Françoise Benz

    2006-01-01

    ACADEMIC TRAINING LECTURE SERIES 13, 14, 15, March, from 11:00 to 12:00 - 16 March from 10:00 to 12:00 Main Auditorium, bldg. 500 on 14, 15 March, Council Room on 13, 16 March LHC luminosity upgrade: detector challenges A. De Roeck / CERN-PH, D. Bortoletto / Purdue Univ. USA, R. Wigmans / Texas, Tech Univ. USA, W. Riegler / CERN-PH, W. Smith / Wisconsin Univ. USA The upgrade of the LHC machine towards higher luminosity (1035 cm-2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector ...

  10. UPGRADES TO Monteburns, VERSION 3.0

    Energy Technology Data Exchange (ETDEWEB)

    Galloway, Jack D [Los Alamos National Laboratory; Trellue, Holly R [Los Alamos National Laboratory

    2012-06-22

    Monteburns VERSION 3.0 is an upgrade of the existing Monteburns code available through RSICC. The new version includes modern programming style, increased parallel computing, more accurate capture gamma calculations and an automated input generator. This capability was demonstrated through a small PWR core simulation.

  11. Upgrade of the CERN telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, maintenance work will be carried out on the CERN switching centre between 8.00 p.m. and 10.00 p.m. on Monday 9 October. Telephone services may be disrupted and possibly even interrupted during this time. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  12. ISOLDE Off-line Gas Leak Upgrade

    CERN Document Server

    Nielsen, Kristoffer Bested

    2017-01-01

    This study investigates gas injection system of the ISOLDE Off-line separator. A quadrupole mass spectrometer is used to analysis the composition of the gas. Based on these measurements a contamination of the injected gas is found and a system upgrade is purposed. Furthermore a calibration of the leak rate of the leak valve is made.

  13. Hardware upgrade for A2 data acquisition

    Energy Technology Data Exchange (ETDEWEB)

    Ostrick, Michael; Gradl, Wolfgang; Otte, Peter-Bernd; Neiser, Andreas; Steffen, Oliver; Wolfes, Martin; Koerner, Tito [Institut fuer Kernphysik, Mainz (Germany); Collaboration: A2-Collaboration

    2014-07-01

    The A2 Collaboration uses an energy tagged photon beam which is produced via bremsstrahlung off the MAMI electron beam. The detector system consists of Crystal Ball and TAPS and covers almost the whole solid angle. A frozen-spin polarized target allows to perform high precision measurements of polarization observables in meson photo-production. During the last summer, a major upgrade of the data acquisition system was performed, both on the hardware and the software side. The goal of this upgrade was increased reliability of the system and an improvement in the data rate to disk. By doubling the number of readout CPUs and employing special VME crates with a split backplane, the number of bus accesses per readout cycle and crate was cut by a factor of two, giving almost a factor of two gain in the readout rate. In the course of the upgrade, we also switched most of the detector control system to using the distributed control system EPICS. For the upgraded control system, some new tools were developed to make full use of the capabilities of this decentralised slow control and monitoring system. The poster presents some of the major contributions to this project.

  14. The BABAR detector: Upgrades, operation and performance

    Science.gov (United States)

    Aubert, B.; Barate, R.; Boutigny, D.; Couderc, F.; del Amo Sanchez, P.; Gaillard, J.-M.; Hicheur, A.; Karyotakis, Y.; Lees, J. P.; Poireau, V.; Prudent, X.; Robbe, P.; Tisserand, V.; Zghiche, A.; Grauges, E.; Garra Tico, J.; Lopez, L.; Martinelli, M.; Palano, A.; Pappagallo, M.; Pompili, A.; Chen, G. P.; Chen, J. C.; Qi, N. D.; Rong, G.; Wang, P.; Zhu, Y. S.; Eigen, G.; Stugu, B.; Sun, L.; Abrams, G. S.; Battaglia, M.; Borgland, A. W.; Breon, A. B.; Brown, D. N.; Button-Shafer, J.; Cahn, R. N.; Charles, E.; Clark, A. R.; Day, C. T.; Furman, M.; Gill, M. S.; Groysman, Y.; Jacobsen, R. G.; Kadel, R. W.; Kadyk, J. A.; Kerth, L. T.; Kolomensky, Yu. G.; Kral, J. F.; Kukartsev, G.; LeClerc, C.; Levi, M. E.; Lynch, G.; Merchant, A. M.; Mir, L. M.; Oddone, P. J.; Orimoto, T. J.; Osipenkov, I. L.; Pripstein, M.; Roe, N. A.; Romosan, A.; Ronan, M. T.; Shelkov, V. G.; Suzuki, A.; Tackmann, K.; Tanabe, T.; Wenzel, W. A.; Zisman, M.; Barrett, M.; Bright-Thomas, P. G.; Ford, K. E.; Harrison, T. J.; Hart, A. J.; Hawkes, C. M.; Knowles, D. J.; Morgan, S. E.; O'Neale, S. W.; Penny, R. C.; Smith, D.; Soni, N.; Watson, A. T.; Watson, N. K.; Goetzen, K.; Held, T.; Koch, H.; Kunze, M.; Lewandowski, B.; Pelizaeus, M.; Peters, K.; Schmuecker, H.; Schroeder, T.; Steinke, M.; Fella, A.; Antonioli, E.; Boyd, J. T.; Chevalier, N.; Cottingham, W. N.; Foster, B.; Mackay, C.; Walker, D.; Abe, K.; Asgeirsson, D. J.; Cuhadar-Donszelmann, T.; Fulsom, B. G.; Hearty, C.; Knecht, N. S.; Mattison, T. S.; McKenna, J. A.; Thiessen, D.; Khan, A.; Kyberd, P.; McKemey, A. K.; Randle-Conde, A.; Saleem, M.; Sherwood, D. J.; Teodorescu, L.; Blinov, V. E.; Bukin, A. D.; Buzykaev, A. R.; Druzhinin, V. P.; Golubev, V. B.; Korol, A. A.; Kravchenko, E. A.; Onuchin, A. P.; Serednyakov, S. I.; Skovpen, Yu. I.; Solodov, E. P.; Telnov, V. I.; Todyshev, K. Yu.; Yushkov, A. N.; Best, D. S.; Bondioli, M.; Bruinsma, M.; Chao, M.; Curry, S.; Eschrich, I.; Kirkby, D.; Lankford, A. J.; Mandelkern, M.; Martin, E. C.; McMahon, S.; Mommsen, R. K.; Stoker, D. P.; Abachi, S.; Buchanan, C.; Hartfiel, B. L.; Weinstein, A. J. R.; Atmacan, H.; Foulkes, S. D.; Gary, J. W.; Layter, J.; Liu, F.; Long, O.; Shen, B. C.; Vitug, G. M.; Wang, K.; Yasin, Z.; Zhang, L.; Hadavand, H. K.; Hill, E. J.; Paar, H. P.; Rahatlou, S.; Schwanke, U.; Sharma, V.; Berryhill, J. W.; Campagnari, C.; Cunha, A.; Dahmes, B.; Hong, T. M.; Kovalskyi, D.; Kuznetsova, N.; Levy, S. L.; Lu, A.; Mazur, M. A.; Richman, J. D.; Verkerke, W.; Beck, T. W.; Beringer, J.; Eisner, A. M.; Flacco, C. J.; Grillo, A. A.; Grothe, M.; Heusch, C. A.; Kroseberg, J.; Lockman, W. S.; Martinez, A. J.; Nesom, G.; Schalk, T.; Schmitz, R. E.; Schumm, B. A.; Seiden, A.; Spencer, E.; Spradlin, P.; Turri, M.; Walkowiak, W.; Wang, L.; Wilder, M.; Williams, D. C.; Wilson, M. G.; Winstrom, L. O.; Chen, E.; Cheng, C. H.; Doll, D. A.; Dorsten, M. P.; Dvoretskii, A.; Echenard, B.; Erwin, R. J.; Fang, F.; Flood, K.; Hitlin, D. G.; Metzler, S.; Narsky, I.; Oyang, J.; Piatenko, T.; Porter, F. C.; Ryd, A.; Samuel, A.; Yang, S.; Zhu, R. Y.; Andreassen, R.; Devmal, S.; Geld, T. L.; Jayatilleke, S.; Mancinelli, G.; Meadows, B. T.; Mishra, K.; Sokoloff, M. D.; Abe, T.; Antillon, E. A.; Barillari, T.; Becker, J.; Blanc, F.; Bloom, P. C.; Chen, S.; Clifton, Z. C.; Derrington, I. M.; Destree, J.; Dima, M. O.; Ford, W. T.; Gaz, A.; Gilman, J. D.; Hachtel, J.; Hirschauer, J. F.; Johnson, D. R.; Kreisel, A.; Nagel, M.; Nauenberg, U.; Olivas, A.; Rankin, P.; Roy, J.; Ruddick, W. O.; Smith, J. G.; Ulmer, K. A.; van Hoek, W. C.; Wagner, S. R.; West, C. G.; Zhang, J.; Ayad, R.; Blouw, J.; Chen, A.; Eckhart, E. A.; Harton, J. L.; Hu, T.; Toki, W. H.; Wilson, R. J.; Winklmeier, F.; Zeng, Q. L.; Altenburg, D.; Feltresi, E.; Hauke, A.; Jasper, H.; Karbach, M.; Merkel, J.; Petzold, A.; Spaan, B.; Wacker, K.; Brandt, T.; Brose, J.; Colberg, T.; Dahlinger, G.; Dickopp, M.; Eckstein, P.; Futterschneider, H.; Kaiser, S.; Kobel, M. J.; Krause, R.; Müller-Pfefferkorn, R.; Mader, W. F.; Maly, E.; Nogowski, R.; Otto, S.; Schubert, J.; Schubert, K. R.; Schwierz, R.; Sundermann, J. E.; Volk, A.; Wilden, L.; Bernard, D.; Brochard, F.; Cohen-Tanugi, J.; Dohou, F.; Ferrag, S.; Latour, E.; Mathieu, A.; Renard, C.; Schrenk, S.; T'Jampens, S.; Thiebaux, Ch.; Vasileiadis, G.; Verderi, M.; Anjomshoaa, A.; Bernet, R.; Clark, P. J.; Lavin, D. R.; Muheim, F.; Playfer, S.; Robertson, A. I.; Swain, J. E.; Watson, J. E.; Xie, Y.; Andreotti, D.; Andreotti, M.; Bettoni, D.; Bozzi, C.; Calabrese, R.; Carassiti, V.; Cecchi, A.; Cibinetto, G.; Cotta Ramusino, A.; Evangelisti, F.; Fioravanti, E.; Franchini, P.; Garzia, I.; Landi, L.; Luppi, E.; Malaguti, R.; Negrini, M.; Padoan, C.; Petrella, A.; Piemontese, L.; Santoro, V.; Sarti, A.; Anulli, F.; Baldini-Ferroli, R.; Calcaterra, A.; Finocchiaro, G.; Pacetti, S.; Patteri, P.; Peruzzi, I. M.; Piccolo, M.; Rama, M.; de Sangro, R.; Santoni, M.; Zallo, A.; Bagnasco, S.; Buzzo, A.; Capra, R.; Contri, R.; Crosetti, G.; Lo Vetere, M.; Macri, M. M.; Minutoli, S.; Monge, M. R.; Musico, P.; Passaggio, S.; Pastore, F. C.; Patrignani, C.; Pia, M. G.; Robutti, E.; Santroni, A.; Tosi, S.; Bhuyan, B.; Prasad, V.; Bailey, S.; Brandenburg, G.; Chaisanguanthum, K. S.; Lee, C. L.; Morii, M.; Won, E.; Wu, J.; Adametz, A.; Dubitzky, R. S.; Marks, J.; Schenk, S.; Uwer, U.; Klose, V.; Lacker, H. M.; Aspinwall, M. L.; Bhimji, W.; Bowerman, D. A.; Dauncey, P. D.; Egede, U.; Flack, R. L.; Gaillard, J. R.; Gunawardane, N. J. W.; Morton, G. W.; Nash, J. A.; Nikolich, M. B.; Panduro Vazquez, W.; Sanders, P.; Smith, D.; Taylor, G. P.; Tibbetts, M.; Behera, P. K.; Chai, X.; Charles, M. J.; Grenier, G. J.; Hamilton, R.; Lee, S.-J.; Mallik, U.; Meyer, N. T.; Chen, C.; Cochran, J.; Crawley, H. B.; Dong, L.; Eyges, V.; Fischer, P.-A.; Lamsa, J.; Meyer, W. T.; Prell, S.; Rosenberg, E. I.; Rubin, A. E.; Gao, Y. Y.; Gritsan, A. V.; Guo, Z. J.; Lae, C. K.; Schott, G.; Albert, J. N.; Arnaud, N.; Beigbeder, C.; Breton, D.; Davier, M.; Derkach, D.; Dû, S.; Firmino da Costa, J.; Grosdidier, G.; Höcker, A.; Laplace, S.; Le Diberder, F.; Lepeltier, V.; Lutz, A. M.; Malaescu, B.; Nief, J. Y.; Petersen, T. C.; Plaszczynski, S.; Pruvot, S.; Roudeau, P.; Schune, M. H.; Serrano, J.; Sordini, V.; Stocchi, A.; Tocut, V.; Trincaz-Duvoid, S.; Wang, L. L.; Wormser, G.; Bionta, R. M.; Brigljević, V.; Lange, D. J.; Simani, M. C.; Wright, D. M.; Bingham, I.; Burke, J. P.; Chavez, C. A.; Coleman, J. P.; Forster, I. J.; Fry, J. R.; Gabathuler, E.; Gamet, R.; George, M.; Hutchcroft, D. E.; Kay, M.; Parry, R. J.; Payne, D. J.; Schofield, K. C.; Sloane, R. J.; Touramanis, C.; Azzopardi, D. E.; Bellodi, G.; Bevan, A. J.; Clarke, C. K.; Cormack, C. M.; Di Lodovico, F.; Dixon, P.; George, K. A.; Menges, W.; Potter, R. J. L.; Sacco, R.; Shorthouse, H. W.; Sigamani, M.; Strother, P.; Vidal, P. B.; Brown, C. L.; Cowan, G.; Flaecher, H. U.; George, S.; Green, M. G.; Hopkins, D. A.; Jackson, P. S.; Kurup, A.; Marker, C. E.; McGrath, P.; McMahon, T. R.; Paramesvaran, S.; Salvatore, F.; Vaitsas, G.; Winter, M. A.; Wren, A. C.; Brown, D. N.; Davis, C. L.; Denig, A. G.; Fritsch, M.; Gradl, W.; Griessinger, K.; Hafner, A.; Prencipe, E.; Allison, J.; Alwyn, K. E.; Bailey, D. S.; Barlow, N. R.; Barlow, R. J.; Chia, Y. M.; Edgar, C. L.; Forti, A. C.; Fullwood, J.; Hart, P. A.; Hodgkinson, M. C.; Jackson, F.; Jackson, G.; Kelly, M. P.; Kolya, S. D.; Lafferty, G. D.; Lyon, A. J.; Naisbit, M. T.; Savvas, N.; Weatherall, J. H.; West, T. J.; Williams, J. C.; Yi, J. I.; Anderson, J.; Farbin, A.; Hulsbergen, W. D.; Jawahery, A.; Lillard, V.; Roberts, D. A.; Schieck, J. R.; Simi, G.; Tuggle, J. M.; Blaylock, G.; Dallapiccola, C.; Hertzbach, S. S.; Kofler, R.; Koptchev, V. B.; Li, X.; Moore, T. B.; Salvati, E.; Saremi, S.; Staengle, H.; Willocq, S. Y.; Cowan, R.; Dujmic, D.; Fisher, P. H.; Henderson, S. W.; Koeneke, K.; Lang, M. I.; Sciolla, G.; Spitznagel, M.; Taylor, F.; Yamamoto, R. K.; Yi, M.; Zhao, M.; Zheng, Y.; Klemetti, M.; Lindemann, D.; Mangeol, D. J. J.; Mclachlin, S. E.; Milek, M.; Patel, P. M.; Robertson, S. H.; Biassoni, P.; Cerizza, G.; Lazzaro, A.; Lombardo, V.; Neri, N.; Palombo, F.; Pellegrini, R.; Stracka, S.; Bauer, J. M.; Cremaldi, L.; Eschenburg, V.; Kroeger, R.; Reidy, J.; Sanders, D. A.; Summers, D. J.; Zhao, H. W.; Godang, R.; Brunet, S.; Cote, D.; Nguyen, X.; Simard, M.; Taras, P.; Viaud, B.; Nicholson, H.; Cavallo, N.; De Nardo, G.; Fabozzi, F.; Gatto, C.; Lista, L.; Monorchio, D.; Onorato, G.; Paolucci, P.; Piccolo, D.; Sciacca, C.; Baak, M. A.; Raven, G.; Snoek, H. L.; Jessop, C. P.; Knoepfel, K. J.; LoSecco, J. M.; Wang, W. F.; Allmendinger, T.; Benelli, G.; Brau, B.; Corwin, L. A.; Gan, K. K.; Honscheid, K.; Hufnagel, D.; Kagan, H.; Kass, R.; Morris, J. P.; Rahimi, A. M.; Regensburger, J. J.; Smith, D. S.; Ter-Antonyan, R.; Wong, Q. K.; Blount, N. L.; Brau, J.; Frey, R.; Igonkina, O.; Iwasaki, M.; Kolb, J. A.; Lu, M.; Potter, C. T.; Rahmat, R.; Sinev, N. B.; Strom, D.; Strube, J.; Torrence, E.; Borsato, E.; Castelli, G.; Colecchia, F.; Crescente, A.; Dal Corso, F.; Dorigo, A.; Fanin, C.; Furano, F.; Gagliardi, N.; Galeazzi, F.; Margoni, M.; Marzolla, M.; Michelon, G.; Morandin, M.; Posocco, M.; Rotondo, M.; Simonetto, F.; Solagna, P.; Stevanato, E.; Stroili, R.; Tiozzo, G.; Voci, C.; Akar, S.; Bailly, P.; Ben-Haim, E.; Bonneaud, G.; Briand, H.; Chauveau, J.; Hamon, O.; John, M. J. J.; Lebbolo, H.; Leruste, Ph.; Malclès, J.; Marchiori, G.; Martin, L.; Ocariz, J.; Perez, A.; Pivk, M.; Prendki, J.; Roos, L.; Sitt, S.; Stark, J.; Thérin, G.; Vallereau, A.; Biasini, M.; Covarelli, R.; Manoni, E.; Pennazzi, S.; Pioppi, M.; Angelini, C.; Batignani, G.; Bettarini, S.; Bosi, F.; Bucci, F.; Calderini, G.; Carpinelli, M.; Cenci, R.; Cervelli, A.; Forti, F.; Giorgi, M. A.; Lusiani, A.; Marchiori, G.; Morganti, M.; Morsani, F.; Paoloni, E.; Raffaelli, F.; Rizzo, G.; Sandrelli, F.; Triggiani, G.; Walsh, J. J.; Haire, M.; Judd, D.; Biesiada, J.; Danielson, N.; Elmer, P.; Fernholz, R. E.; Lau, Y. P.; Lu, C.; Miftakov, V.; Olsen, J.; Lopes Pegna, D.; Sands, W. R.; Smith, A. J. S.; Telnov, A. V.; Tumanov, A.; Varnes, E. W.; Baracchini, E.; Bellini, F.; Bulfon, C.; Buccheri, E.; Cavoto, G.; D'Orazio, A.; Di Marco, E.; Faccini, R.; Ferrarotto, F.; Ferroni, F.; Gaspero, M.; Jackson, P. D.; Lamanna, E.; Leonardi, E.; Li Gioi, L.; Lunadei, R.; Mazzoni, M. A.; Morganti, S.; Piredda, G.; Polci, F.; del Re, D.; Renga, F.; Safai Tehrani, F.; Serra, M.; Voena, C.; Bünger, C.; Christ, S.; Hartmann, T.; Leddig, T.; Schröder, H.; Wagner, G.; Waldi, R.; Adye, T.; Bly, M.; Brew, C.; Condurache, C.; De Groot, N.; Franek, B.; Geddes, N. I.; Gopal, G. P.; Olaiya, E. O.; Ricciardi, S.; Roethel, W.; Wilson, F. F.; Xella, S. M.; Aleksan, R.; Bourgeois, P.; Emery, S.; Escalier, M.; Esteve, L.; Gaidot, A.; Ganzhur, S. F.; Giraud, P.-F.; Georgette, Z.; Graziani, G.; Hamel de Monchenault, G.; Kozanecki, W.; Langer, M.; Legendre, M.; London, G. W.; Mayer, B.; Micout, P.; Serfass, B.; Vasseur, G.; Yèche, Ch.; Zito, M.; Allen, M. T.; Akre, R.; Aston, D.; Azemoon, T.; Bard, D. J.; Bartelt, J.; Bartoldus, R.; Bechtle, P.; Becla, J.; Benitez, J. F.; Berger, N.; Bertsche, K.; Boeheim, C. T.; Bouldin, K.; Boyarski, A. M.; Boyce, R. F.; Browne, M.; Buchmueller, O. L.; Burgess, W.; Cai, Y.; Cartaro, C.; Ceseracciu, A.; Claus, R.; Convery, M. R.; Coupal, D. P.; Craddock, W. W.; Crane, G.; Cristinziani, M.; DeBarger, S.; Decker, F. J.; Dingfelder, J. C.; Donald, M.; Dorfan, J.; Dubois-Felsmann, G. P.; Dunwoodie, W.; Ebert, M.; Ecklund, S.; Erickson, R.; Fan, S.; Field, R. C.; Fisher, A.; Fox, J.; Franco Sevilla, M.; Fulsom, B. G.; Gabareen, A. M.; Gaponenko, I.; Glanzman, T.; Gowdy, S. J.; Graham, M. T.; Grenier, P.; Hadig, T.; Halyo, V.; Haller, G.; Hamilton, J.; Hanushevsky, A.; Hasan, A.; Hast, C.; Hee, C.; Himel, T.; Hryn'ova, T.; Huffer, M. E.; Hung, T.; Innes, W. R.; Iverson, R.; Kaminski, J.; Kelsey, M. H.; Kim, H.; Kim, P.; Kharakh, D.; Kocian, M. L.; Krasnykh, A.; Krebs, J.; Kroeger, W.; Kulikov, A.; Kurita, N.; Langenegger, U.; Leith, D. W. G. S.; Lewis, P.; Li, S.; Libby, J.; Lindquist, B.; Luitz, S.; Lüth, V.; Lynch, H. L.; MacFarlane, D. B.; Marsiske, H.; McCulloch, M.; McDonald, J.; Melen, R.; Menke, S.; Metcalfe, S.; Messner, R.; Moss, L. J.; Mount, R.; Muller, D. R.; Neal, H.; Nelson, D.; Nelson, S.; Nordby, M.; Nosochkov, Y.; Novokhatski, A.; O'Grady, C. P.; O'Neill, F. G.; Ofte, I.; Ozcan, V. E.; Perazzo, A.; Perl, M.; Petrak, S.; Piemontese, M.; Pierson, S.; Pulliam, T.; Ratcliff, B. N.; Ratkovsky, S.; Reif, R.; Rivetta, C.; Rodriguez, R.; Roodman, A.; Salnikov, A. A.; Schietinger, T.; Schindler, R. H.; Schwarz, H.; Schwiening, J.; Seeman, J.; Smith, D.; Snyder, A.; Soha, A.; Stanek, M.; Stelzer, J.; Su, D.; Sullivan, M. K.; Suzuki, K.; Swain, S. K.; Tanaka, H. A.; Teytelman, D.; Thompson, J. M.; Tinslay, J. S.; Trunov, A.; Turner, J.; van Bakel, N.; van Winkle, D.; Va'vra, J.; Wagner, A. P.; Weaver, M.; Weinstein, A. J. R.; Weber, T.; West, C. A.; Wienands, U.; Wisniewski, W. J.; Wittgen, M.; Wittmer, W.; Wright, D. H.; Wulsin, H. W.; Yan, Y.; Yarritu, A. K.; Yi, K.; Yocky, G.; Young, C. C.; Ziegler, V.; Chen, X. R.; Liu, H.; Park, W.; Purohit, M. V.; Singh, H.; Weidemann, A. W.; White, R. M.; Wilson, J. R.; Yumiceva, F. X.; Sekula, S. J.; Bellis, M.; Burchat, P. R.; Edwards, A. J.; Majewski, S. A.; Meyer, T. I.; Miyashita, T. S.; Petersen, B. A.; Roat, C.; Ahmed, M.; Ahmed, S.; Alam, M. S.; Bula, R.; Ernst, J. A.; Jain, V.; Liu, J.; Pan, B.; Saeed, M. A.; Wappler, F. R.; Zain, S. B.; Gorodeisky, R.; Guttman, N.; Peimer, D.; Soffer, A.; De Silva, A.; Lund, P.; Krishnamurthy, M.; Ragghianti, G.; Spanier, S. M.; Wogsland, B. J.; Eckmann, R.; Ritchie, J. L.; Ruland, A. M.; Satpathy, A.; Schilling, C. J.; Schwitters, R. F.; Wray, B. C.; Drummond, B. W.; Izen, J. M.; Kitayama, I.; Lou, X. C.; Ye, S.; Bianchi, F.; Bona, M.; Gallo, F.; Gamba, D.; Pelliccioni, M.; Bomben, M.; Borean, C.; Bosisio, L.; Cossutti, F.; Della Ricca, G.; Dittongo, S.; Grancagnolo, S.; Lanceri, L.; Poropat, P.; Rashevskaya, I.; Vitale, L.; Vuagnin, G.; Manfredi, P. F.; Re, V.; Speziali, V.; Frank, E. D.; Gladney, L.; Guo, Q. H.; Panetta, J.; Azzolini, V.; Lopez-March, N.; Martinez-Vidal, F.; Milanes, D. A.; Oyanguren, A.; Agarwal, A.; Albert, J.; Banerjee, Sw.; Bernlochner, F. U.; Brown, C. M.; Choi, H. H. F.; Fortin, D.; Fransham, K. B.; Hamano, K.; Kowalewski, R.; Lewczuk, M. J.; Nugent, I. M.; Roney, J. M.; Sobie, R. J.; Back, J. J.; Gershon, T. J.; Harrison, P. F.; Ilic, J.; Latham, T. E.; Mohanty, G. B.; Puccio, E.; Band, H. R.; Chen, X.; Cheng, B.; Dasu, S.; Datta, M.; Eichenbaum, A. M.; Hollar, J. J.; Hu, H.; Johnson, J. R.; Kutter, P. E.; Li, H.; Liu, R.; Mellado, B.; Mihalyi, A.; Mohapatra, A. K.; Pan, Y.; Pierini, M.; Prepost, R.; Scott, I. J.; Tan, P.; Vuosalo, C. O.; von Wimmersperg-Toeller, J. H.; Wu, S. L.; Yu, Z.; Greene, M. G.; Kordich, T. M. B.

    2013-11-01

    The BABAR detector operated successfully at the PEP-II asymmetric e+e- collider at the SLAC National Accelerator Laboratory from 1999 to 2008. This report covers upgrades, operation, and performance of the collider and the detector systems, as well as the trigger, online and offline computing, and aspects of event reconstruction since the beginning of data taking.

  15. Recent ASDEX Upgrade research in support of ITER and DEMO

    Science.gov (United States)

    H. Zohmthe ASDEX Upgrade Team; the EUROfusion MST1 Team

    2015-10-01

    Recent experiments on the ASDEX Upgrade tokamak aim at improving the physics base for ITER and DEMO to aid the machine design and prepare efficient operation. Type I edge localized mode (ELM) mitigation using resonant magnetic perturbations (RMPs) has been shown at low pedestal collisionality (νped\\ast PLH occurs indicates that ITER could take advantage of it to initiate H-mode at lower density than that of the final Q = 10 operational point. Core density fluctuation measurements resolved in radius and wave number show that an increase of R/LTe introduced by off-axis electron cyclotron resonance heating (ECRH) mainly increases the large scale fluctuations. The radial variation of the fluctuation level is in agreement with simulations using the GENE code. Fast particles are shown to undergo classical slowing down in the absence of large scale magnetohydrodynamic (MHD) events and for low heating power, but show signs of anomalous radial redistribution at large heating power, consistent with a broadened off-axis neutral beam current drive current profile under these conditions. Neoclassical tearing mode (NTM) suppression experiments using electron cyclotron current drive (ECCD) with feedback controlled deposition have allowed to test several control strategies for ITER, including automated control of (3,2) and (2,1) NTMs during a single discharge. Disruption mitigation studies using massive gas injection (MGI) can show an increased fuelling efficiency with high field side injection, but a saturation of the fuelling efficiency is observed at high injected mass as needed for runaway electron suppression. Large locked modes can significantly decrease the fuelling efficiency and increase the asymmetry of radiated power during MGI mitigation. Concerning power exhaust, the partially detached ITER divertor scenario has been demonstrated at Psep/R = 10 MW m-1 in ASDEX Upgrade, with a peak time averaged target load around 5 MW m-2, well consistent with the component limits

  16. The JLAB 12 GeV Energy Upgrade of CEBAF

    Energy Technology Data Exchange (ETDEWEB)

    Harwood, Leigh H. [JLAB

    2013-12-01

    This presentation should describe the progress of the 12GeV Upgrade of CEBAF at Jefferson Lab. The status of the upgrade should be presented as well as details on the construction, procurement, installation and commissioning of the magnet and SRF components of the upgrade.

  17. Switched capacitor DC-DC converter ASICs for the upgraded LHC trackers

    Energy Technology Data Exchange (ETDEWEB)

    Bochenek, M; Faccio, F; Michelis, S [CERN, CH-1211 Geneve 23 (Switzerland); Dabrowski, W, E-mail: Michal.Bochenek@cern.ch [AGH University of Science and Technology, Faculty of Physics and Applied Computer Science, Al. Mickiewicza 30 30-059 Krakow (Poland)

    2010-12-15

    The High Luminosity Upgrade of the ATLAS Inner Tracker puts demanding requirements on the powering system of the silicon strip detector modules due to 10-fold increase of the channel count compared to the existing SemiConductor Tracker. Therefore, new solutions for the powering scheme must be elaborated. Currently two possible approaches, the serial powering and the parallel powering scheme using the DC-DC conversion technique, are under development. This paper describes two switched capacitor DC-DC converters designed in a 130 nm technology. For the optimized step-down converter, foreseen for the parallel powering scheme, power efficiency of 97% has been achieved, while for the charge pump, designed for the serial powering scheme, power efficiency of 85% has been achieved.

  18. Switched capacitor DC-DC converter ASICs for the upgraded LHC trackers

    CERN Document Server

    Bochenek, M; Faccio, F; Michelis, S

    2010-01-01

    The High Luminosity Upgrade of the ATLAS Inner Tracker puts demanding requirements on the powering system of the silicon strip detector modules due to 10-fold increase of the channel count compared to the existing SemiConductor Tracker. Therefore, new solutions for the powering scheme must be elaborated. Currently two possible approaches, the serial powering and the parallel powering scheme using the DC-DC conversion technique, are under development. This paper describes two switched capacitor DC-DC converters designed in a 130 nm technology. For the optimized step-down converter, foreseen for the parallel powering scheme, power efficiency of 97% has been achieved, while for the charge pump, designed for the serial powering scheme, power efficiency of 85% has been achieved

  19. Upgrades and application of FIT3D NBI-plasma interaction code in view of LHD deuterium campaigns

    Science.gov (United States)

    Vincenzi, P.; Bolzonella, T.; Murakami, S.; Osakabe, M.; Seki, R.; Yokoyama, M.

    2016-12-01

    This work presents an upgrade of the FIT3D neutral beam-plasma interaction code, part of TASK3D, a transport suite of codes, and its application to LHD experiments in the framework of the preparation for the first deuterium experiments in the LHD. The neutral beam injector (NBI) system will be upgraded to D injection, and efforts have been recently made to extend LHD modelling capabilities to D operations. The implemented upgrades for FIT3D to enable D NBI modelling in D plasmas are presented, with a discussion and benchmark of the models used. In particular, the beam ionization module has been modified and a routine for neutron production estimation has been implemented. The upgraded code is then used to evaluate the NBI power deposition in experiments with different plasma compositions. In the recent LHD campaign, in fact, He experiments have been run to help the prediction of main effects which may be relevant in future LHD D plasmas. Identical H/He experiments showed similar electron density and temperature profiles, while a higher ion temperature with an He majority has been observed. From first applications of the upgraded FIT3D code it turns out that, although more NB power appears to be coupled with the He plasma, the NBI power deposition is unaffected, suggesting that heat deposition does not play a key role in the increased ion temperature with He plasma.

  20. DC uninterrupted power supply having instantaneous switching followed by low impedance switching

    Science.gov (United States)

    Hammond, Russell E.; Northup, Robert L.; Shimp, Alan G.

    1991-10-01

    An uninterruptible power supply is provided that incorporates switching circuitry permitting a path for instantaneous DC backup power to be supplied to a voltage-declining primary power supply bus. Once the instantaneous transition is made, battery power is switched to a low impedance path to provide long-term battery power delivery to the bus. At a point where the backup batteries no longer supply useful power to a load, disabling circuitry disconnects the batteries from the load so that excessive draining of the batteries does not result in irreversible battery damage. The uninterruptible power supply of the invention further includes an automatic battery charging circuitry that seeks to maintain the power supply batteries at optimal charge level. To enable an operator to adequately assess battery charge condition, the invention provides battery test circuitry that causes a simulated load to appear at the power supply batteries. Visual representations are then made as to battery status.

  1. Solid-State Cloud Radar System (CRS) Upgrade and Deployment

    Science.gov (United States)

    McLinden, Matt; Heymsfield, Gerald; Li, Lihua; Racette, Paul; Coon, Michael; Venkatesh, Vijay

    2015-01-01

    The recent decade has brought rapid development in solid-state power amplifier (SSPA) technology. This has enabled the use of solid-state precipitation radar in place of high-power and high-voltage systems such as those that use Klystron or Magnetron transmitters. The NASA Goddard Space Flight Center has recently completed a comprehensive redesign of the 94 gigahertz Cloud Radar System (CRS) to incorporate a solid-state transmitter. It is the first cloud radar to achieve sensitivity comparable to that of a high-voltage transmitter using solid-state. The NASA Goddard Space Flight Center's Cloud Radar System (CRS) is a 94 gigahertz Doppler radar that flies on the NASA ER-2 high-altitude aircraft. The upgraded CRS system utilizes a state-of-the-art solid-state 94 gigahertz power amplifier with a peak transmit power of 30 watts. The modernized CRS system is detailed here with data results from its deployment during the 2014 Integrated Precipitation and Hydrology Experiment (IPHEX).

  2. Real time capable infrared thermography for ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Sieglin, B., E-mail: Bernhard.Sieglin@ipp.mpg.de; Faitsch, M.; Herrmann, A.; Brucker, B.; Eich, T.; Kammerloher, L.; Martinov, S. [Max-Planck Institute for Plasma Physics, Boltzmannstr. 2, D-85748 Garching (Germany)

    2015-11-15

    Infrared (IR) thermography is widely used in fusion research to study power exhaust and incident heat load onto the plasma facing components. Due to the short pulse duration of today’s fusion experiments, IR systems have mostly been designed for off-line data analysis. For future long pulse devices (e.g., Wendelstein 7-X, ITER), a real time evaluation of the target temperature and heat flux is mandatory. This paper shows the development of a real time capable IR system for ASDEX Upgrade. A compact IR camera has been designed incorporating the necessary magnetic and electric shielding for the detector, cooler assembly. The camera communication is based on the Camera Link industry standard. The data acquisition hardware is based on National Instruments hardware, consisting of a PXIe chassis inside and a fibre optical connected industry computer outside the torus hall. Image processing and data evaluation are performed using real time LabVIEW.

  3. Consolidation and upgrades of the ATLAS Tile Calorimeter

    CERN Document Server

    Cerda Alberich, Leonor; The ATLAS collaboration

    2017-01-01

    This is a presentation of the status of the ATLAS Tile Calorimeter during the EYETS and before starting 2017 data-taking. Updates on the upgrade of the readout system such as doubling the RODs output links and the number of processing units (PUs) are being worked on at the moment as well as items concerning the maintenance of the detector which involves issues such as cooling leaks and consolidation of the Low Voltage Power Supplies, which are being replaced if necessary. Other updates include works on the Tile calibration, in particular on the Cesium system. In addition, the whole Tile readout electronics is being replaced for Phase-II and it is being tested in Test Beam area.

  4. Cost-effectiveness of conservation upgrades in manufactured homes

    Energy Technology Data Exchange (ETDEWEB)

    Lee, A.D.; Conner, C.C.; Englin, J.E.; Hadley, D.L.; Lucas, R.G.; Miller, N.E.; Monroe, W.H.

    1988-09-01

    This study addresses the costs of upgrading the efficiency of electrically heated manufactured homes in the Bonneville Power Administration's (Bonneville's) service territory. It was prepared by the Battelle Pacific Northwest Laboratory (PNL) for Bonneville under a Related Services Agreement with the US Department of Energy, Contract AC06-76RLO1830. Manufactured homes (commonly called mobile homes) represent a significant lost conservation resource in the region. Manufactured homes are required to meet national energy standards that do not reflect the recent increases in energy prices, and the preemptive nature of the national standards prevents local jurisdictions from establishing stricter requirements. Bonneville has undertaken several programs to analyze the efficiency of manufactured homes and encourage the industry to produce more efficient homes and consumers to increase their demand for efficient units. This study constitutes one portion of Bonneville's overall strategy. 45 refs.

  5. Microprocessor tester for the treat upgrade reactor trip system

    Energy Technology Data Exchange (ETDEWEB)

    Lenkszus, F.R.; Bucher, R.G.

    1984-01-01

    The upgrading of the Transient Reactor Test (TREAT) Facility at ANL-Idaho has been designed to provide additional experimental capabilities for the study of core disruptive accident (CDA) phenomena. In addition, a programmable Automated Reactor Control System (ARCS) will permit high-power transients up to 11,000 MW having a controlled reactor period of from 15 to 0.1 sec. These modifications to the core neutronics will improve simulation of LMFBR accident conditions. Finally, a sophisticated, multiply-redundant safety system, the Reactor Trip System (RTS), will provide safe operation for both steady state and transient production operating modes. To insure that this complex safety system is functioning properly, a Dedicated Microprocessor Tester (DMT) has been implemented to perform a thorough checkout of the RTS prior to all TREAT operations.

  6. Real time capable infrared thermography for ASDEX Upgrade

    Science.gov (United States)

    Sieglin, B.; Faitsch, M.; Herrmann, A.; Brucker, B.; Eich, T.; Kammerloher, L.; Martinov, S.

    2015-11-01

    Infrared (IR) thermography is widely used in fusion research to study power exhaust and incident heat load onto the plasma facing components. Due to the short pulse duration of today's fusion experiments, IR systems have mostly been designed for off-line data analysis. For future long pulse devices (e.g., Wendelstein 7-X, ITER), a real time evaluation of the target temperature and heat flux is mandatory. This paper shows the development of a real time capable IR system for ASDEX Upgrade. A compact IR camera has been designed incorporating the necessary magnetic and electric shielding for the detector, cooler assembly. The camera communication is based on the Camera Link industry standard. The data acquisition hardware is based on National Instruments hardware, consisting of a PXIe chassis inside and a fibre optical connected industry computer outside the torus hall. Image processing and data evaluation are performed using real time LabVIEW.

  7. Upgrading of Intermediate Bio-Oil Produced by Catalytic Pyrolysis

    Energy Technology Data Exchange (ETDEWEB)

    Abdullah, Zia [Battelle Memorial Inst., Columbus, OH (United States); Chadwell, Brad [Battelle Memorial Inst., Columbus, OH (United States); Taha, Rachid [Battelle Memorial Inst., Columbus, OH (United States); Hindin, Barry [Battelle Memorial Inst., Columbus, OH (United States); Ralston, Kevin [Battelle Memorial Inst., Columbus, OH (United States)

    2015-06-30

    The objectives of this project were to (1) develop a process to upgrade catalytic pyrolysis bio-oil, (2) investigate new upgrading catalysts suited for upgrading catalytic pyrolysis bio-oil, (3) demonstrate upgrading system operation for more than 1,000 hours using a single catalyst charge, and (4) produce a final upgraded product that can be blended to 30 percent by weight with petroleum fuels or that is compatible with existing petroleum refining operations. This project has, to the best of our knowledge, for the first time enabled a commercially viable bio-oil hydrotreatment process to produce renewable blend stock for transportation fuels.

  8. Completion of the Brightness Upgrade of the ALS

    Science.gov (United States)

    Steier, C.; Madur, A.; Bailey, B.; Berg, K.; Biocca, A.; Black, A.; Casey, P.; Colomb, D.; Gunion, B.; Li, N.; Marks, S.; Nishimura, H.; Pappas, C.; Petermann, K.; Portmann, G.; Prestemon, S.; Rawlins, A.; Robin, D.; Rossi, S.; Scarvie, T.; Schlueter, R.; Sun, C.; Tarawneh, H.; Wan, W.; Williams, E.; Yin, L.; Zhou, Q.; Jin, J.; Zhang, J.; Chen, C.; Wen, Y.; Wu, J.

    2014-03-01

    The Advanced Light Source (ALS) at Berkeley Lab remains one of the brightest sources for soft x-rays worldwide. A multiyear upgrade of the ALS is underway, which includes new and replacement x-ray beamlines, a replacement of many of the original insertion devices and many upgrades to the accelerator. The accelerator upgrade that affects the ALS performance most directly is the ALS brightness upgrade [1], which reduces the horizontal emittance from 6.3 to 2.0 nm (2.5 nm effective). Magnets for this upgrade were installed in late 2012 and early 2013 followed by user operation with the reduced emittance.

  9. The Demand Side Management Potential to Balance a Highly Renewable European Power System

    Directory of Open Access Journals (Sweden)

    Alexander Kies

    2016-11-01

    Full Text Available Shares of renewables continue to grow in the European power system. A fully renewable European power system will primarily depend on the renewable power sources of wind and photovoltaics (PV, which are not dispatchable but intermittent and therefore pose a challenge to the balancing of the power system. To overcome this issue, several solutions have been proposed and investigated in the past, including storage, backup power, reinforcement of the transmission grid, and demand side management (DSM. In this paper, we investigate the potential of DSM to balance a simplified, fully renewable European power system. For this purpose, we use ten years of weather and historical load data, a power-flow model and the implementation of demand side management as a storage equivalent, to investigate the impact of DSM on the need for backup energy. We show that DSM has the potential to reduce the need for backup energy in Europe by up to one third and can cover the need for backup up to a renewable share of 67%. Finally, it is demonstrated that the optimal mix of wind and PV is shifted by the utilisation of DSM towards a higher share of PV, from 19% to 36%.

  10. SOURCES OF UNINTERRUPTED AND AUTONOMOUS POWER SUPPLY

    Directory of Open Access Journals (Sweden)

    Denisenko E. A.

    2016-01-01

    Full Text Available The article describes the main block diagrams of three types of uninterruptible power supply: backup; interactive; double conversion. The main functions are: the function backup or emergency source of electrical power; the function of protective devices (from an overload currents and short-circuit; improving the quality of the power supply voltage. Alsoб we have disclosed the features of the advantages and disadvantages of uninterruptible power supplies three groups: Off-Line / Stand-By / back-up UPS (passive - reserve; Line-Interactive (line interactive type; On-Line. The article discloses new approaches to structural and schematic-based uninterruptible power supply, including at use of renewable energy, so that the failure of one of the sources does not lead to exit from the operation of the entire of power supply system. As a rule, such systems are built on a modular principle. It is shown that now for remote users from external networks is advisable to apply a system autonomous power supply, representing the totality of sources and converters of electric power, ensuring uninterrupted power supply to consumers. We have presented a typical structure of autonomous systems and given an option of the block diagram of the system and are given explanations and principles of its work. Significantly improves performance reliability of autonomous systems using the modularity of its main functional units. In addition, to increase the efficiency of the system can be through the use in the construction of transformers with static converters rotating magnetic field. To improve the weight, which is important for the transport systems, it is necessary to use links with the intermediate high-frequency electric power conversion in static converters

  11. High heat flux engineering for the upgraded neutral beam injection systems of MAST-U

    Energy Technology Data Exchange (ETDEWEB)

    Dhalla, F., E-mail: Fahim.dhalla@ccfe.ac.uk; Mistry, S.; Turner, I.; Barrett, T.R.; Day, I.; McAdams, R.

    2015-10-15

    Highlights: • A new Residual Ion Dump (RID) and bend magnet system for the upgraded NBI systems have been designed for the 5 s MAST-U pulse requirements. • Design scoping was performed using numerical ion-tracing analysis software (MAGNET and OPERA codes). • A more powerful bending magnet will separate the residual ions into full, half and third energy components. • Three separate CuCrZr dumps spread the power loading resulting in acceptable power footprints. • FE thermo-mechanical analyses using ANSYS to validate the designs against the ITER SDC-IC code. • New bend magnet coils, yoke and CuCrZr water-cooled plates are in the procurement phase. - Abstract: For the initial phase of MAST-U operation the two existing neutral beam injection systems will be used, but must be substantially upgraded to fulfil expected operational requirements. The major elements are the design, manufacture and installation of a bespoke bending magnet and Residual Ion Dump (RID) system. The MAST-design full energy dump is being replaced with new actively-cooled full, half and third energy dumps, designed to receive 2.4 MW of ion power deflected by an iron-cored electromagnet. The main design challenge is limited space available in the vacuum vessel, requiring ion-deflection calculations to ensure acceptable heat flux distribution on the dump panels. This paper presents engineering and physics analysis of the upgraded MAST beamlines and reports the current status of manufacture.

  12. The rehabilitation/upgrading of Philippine Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Renato, T. Banaga [Philippines Nuclear Research Inst., Quezon (Philippines)

    1998-10-01

    The Philippine Research Reactor (PRR-1) is the only research reactor in the Philippines. It was acquired through the Bilateral Agreement with the United States of America. The General Electric (G.E.) supplied PRR-1 first become operational in 1963 and used MTR plate type fuel. The original one-megawatt G.E. reactor was shutdown and converted into a 3 MW TRIGA PULSING REACTOR in 1984. The conversion includes the upgrading of the cooling system, replacement of new reactor coolant pumps, heat exchanger, cooling tower, replacement of new nuclear instrumentation and standard TRIGA console, TRIGA fuel supplied by General Atomic (G.A.). Philippine Nuclear Research Institute (PNRI) provided the old reactor, did the detailed design of the new cooling system, provided the new non-nuclear instrumentation and electrical power supply system and performed all construction, installation and modification work on site. The TRIGA conversion fuel is contained in a shrouded 4-rod cluster which fit into the original grid plate. The new fuel is a E{sub 1}-U-Z{sub 1}-H{sub 1.6} TRIGA fuel, has a 20% wt Uranium loading with 19.7% U-235 enrichment and about 0.5 wt % Erbium. The Start-up, calibration and Demonstration of Pulsing and Full Power Operation were completed during a three week start-up phase which were performed last March 1968. A few days after, a leak in the pool liner was discovered. The reactor was shutdown again for repair and up to present the reactor is still in the process of rehabilitation. This paper will describe the rehabilitation/upgrading done on the PRR-1 since 1988 up to present. (author)

  13. Upgrades for GERDA Phase II

    Science.gov (United States)

    Heisel, Mark

    2014-09-01

    The Germanium Detector Array (GERDA) experiment is searching for the neutrinoless double beta decay (0 νββ) of 76Ge. It is a process that violates lepton number conservation and is predicted to occur in extensions of the standard model of particle physics. GERDA is located underground in the Gran Sasso National Laboratory (LNGS), Italy. An array of bare high-purity germanium detectors enriched in 76Ge is operated in a cryostat with 64 m3 of liquid argon supplemented by a 3 m thick shield of water. The experiment aims at exploring the 0 νββ decay up to a half life of 2 .1026 yr in two phases: Phase I of the experiment has been concluded last year. No signal is observed and the so far best limit is derived for the half life of the 0 νββ decay of 76Ge, T1/20ν power. Low mass detector holders, cold front-end electronics, contacting and cabling schemes are redesigned for ultra low mass and radiopurity. In addition, a retractable liquid argon veto will be installed to efficiently suppress background events that induce scintillation in the liquid argon. A hybrid solution of photomultiplier tubes and silicon photomultipliers coupled to scintillating fibres was chosen. This talk gives an account of the results and these challenging modifications to meet our design goals. The Germanium Detector Array (GERDA) experiment is searching for the neutrinoless double beta decay (0 νββ) of 76Ge. It is a process that violates lepton number conservation and is predicted to occur in extensions of the standard model of particle physics. GERDA is located underground in the Gran Sasso National Laboratory (LNGS), Italy. An array of bare high-purity germanium detectors enriched in 76Ge is operated in a cryostat with 64 m3 of liquid argon supplemented by a 3 m thick shield of water. The experiment aims at exploring the 0 νββ decay up to a half life of 2 .1026 yr in two phases: Phase I of the experiment has been concluded last year. No signal is observed and the so far best

  14. CMS Forward Calorimeters Phase II Upgrade

    CERN Document Server

    Bilki, Burak

    2014-01-01

    The Phase II Upgrade of the CMS forward calorimeters (electromagnetic and hadronic) originates from the fact that these calorimeters will not be sufficiently performant with the expected High Luminosity LHC conditions, planned to be started in 2025. The major challenge is to preserve/improve the high performance of the current forward detectors with new devices that can withstand the unprecedented radiation levels and disentangle the very large event pileup. CMS elected two design concepts to be presented in the Phase II Upgrade Technical Proposal Shashlik electromagnetic calorimeter + Hadronic Endcap Rebuild, and High Granularity Calorimeter. The former concept is based on reconstructing the endcap electromagnetic calorimeter with a shashlik design and replacing the active media of the endcap hadron calorimeter with radiation tolerant active media with a possibility to extend the coverage. The latter concept is concentrating on constructing a high granularity (both longitudinally and laterally) calorimeter ...

  15. Phase 2 Upgrade of the CMS Tracker

    CERN Document Server

    Mersi, Stefano

    2014-01-01

    An upgrade program is planned for the LHC which will smoothly bring the luminosity up to or above ${5\\times10^{34}\\,\\mathrm{cm^{-2}}\\mathrm{s^{-1}}}$ sometimes after 2020, to possibly reach an integrated luminosity of ${3000\\,\\mathrm{fb^{-1}}}$ at the end of that decade. In this ultimate scenario, called Phase-2, when LHC will reach the High Luminosity phase (HL-LHC), CMS will need a completely new Tracker detector, in order to fully exploit the highly-demanding operating conditions and the delivered luminosity. The new Tracker should have also trigger capabilities. To achieve such goals, R\\&D activities are ongoing to explore options and develop solutions that would allow including tracking information at Level-1. The design choices for the CMS pixel and outer tracker upgrades are discussed along with some highlights of the R\\&D activities and expected detector performance.

  16. ECE Imaging Bandwidth Upgrade for TEXTOR

    Science.gov (United States)

    Domier, C. W.; Zhang, P.; Luhmann, N. C., Jr.; Park, H. K.; van de Pol, M. J.; Spakman, G. W.; Jaspers, R.; Donne, A. J. H.

    2007-11-01

    The 128 channel 2-D Electron Cyclotron Emission (ECE) Imaging system collects time-resolved 16x8 images of electron temperature profiles and fluctuations on the TEXTOR tokamak. This instrument was upgraded in February 2007 with new wideband ECE electronics which increased the instantaneous frequency coverage by >50% to 6.4 GHz with a corresponding increase in horizontal plasma coverage. Frequency extenders have been developed to combine modules together to double the instantaneous coverage to 12.8 GHz. Technical details regarding both the electronics upgrade and the frequency extenders as well as the preliminary physics results will be presented. Implementation of a similar but new ECEI instrument on the DIII-D tokamak will be extensively discussed.

  17. Biorefining compounds and organocatalytic upgrading methods

    Science.gov (United States)

    Chen, Eugene Y.; Liu, Dajiang

    2016-10-18

    The invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate into 5,5'-di(hydroxymethyl)furoin (DHMF). While many efficient catalyst systems have been developed for conversion of plant biomass resources into HMF, the invention now provides methods to convert such nonfood biomass directly into DHMF by a simple process as described herein. The invention also provides highly effective new methods for upgrading other biomass furaldehydes and related compound to liquid fuels. The methods include the organocatalytic self-condensation (umpolung) of biomass furaldehydes into (C.sub.8-C.sub.12)furoin intermediates, followed by hydrogenation, etherification or esterification into oxygenated biodiesel, or hydrodeoxygenation by metal-acid tandem catalysis into premium hydrocarbon fuels.

  18. Biorefining compounds and organocatalytic upgrading methods

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Eugene Y.; Liu, Dajiang

    2016-10-18

    The invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate into 5,5'-di(hydroxymethyl)furoin (DHMF). While many efficient catalyst systems have been developed for conversion of plant biomass resources into HMF, the invention now provides methods to convert such nonfood biomass directly into DHMF by a simple process as described herein. The invention also provides highly effective new methods for upgrading other biomass furaldehydes and related compound to liquid fuels. The methods include the organocatalytic self-condensation (umpolung) of biomass furaldehydes into (C.sub.8-C.sub.12)furoin intermediates, followed by hydrogenation, etherification or esterification into oxygenated biodiesel, or hydrodeoxygenation by metal-acid tandem catalysis into premium hydrocarbon fuels.

  19. ALFA detector upgrade before LHC Run 2

    CERN Document Server

    Vorobel, Vit; The ATLAS collaboration

    2016-01-01

    The operation experience with ATLAS ALFA detectors in the LHC environment during the Run1 period has shown significant beam-induced heating. Subsequent comprehensive studies revealed that heating effects could be disastrous in the case of the larger beam intensities foreseen for higher luminosities in the LHC Run2. During the first LHC long shutdown (LS1) all ALFA detectors have been removed from the LHC tunnel and their covers - Roman Pots - underwent a geometry upgrade to minimize the impedance losses. It will be shown that this modification together with a system improving the internal heat transfer and an air cooling system, significantly shifted the temperatures of ALFA detectors away from the critical limits throughout the LHC Run2. Also ALFA trigger system was considerably upgraded to keep measured data safely inside the Run2 ATLAS latency budget and to minimize dead time. The needed hardware changes of the trigger system will be presented in the second part of the talk.

  20. Upgrade of ATLAS ITk Pixel Detector

    CERN Document Server

    Huegging, Fabian; The ATLAS collaboration

    2017-01-01

    The high luminosity upgrade of the LHC (HL-LHC) in 2026 will provide new challenges to the ATLAS tracker. The current inner detector will be replaced with an entirely-silicon inner tracker (ITk) which will consist of a five barrel layer Pixel detector surrounded by a four barrel layer Strip detector. The expected high radiation levels are requiring the development of upgraded silicon sensors as well as new a front-end chip. The dense tracking environment will require finer granularity detectors and low mass global and local support structures. The data rates will require new technologies for high bandwidth data transmission and handling. The current status of the ITk ATLAS Pixel detector developments as well as different layout options will be reviewed.

  1. An Upgrade Proposal from the PHENIX Collaboration

    CERN Document Server

    Adare, A; Aidala, C; Ajitanand, N N; Akiba, Y; Akimoto, R; Alexander, J; Aoki, K; Apadula, N; Asano, H; Atomssa, E T; Awes, T C; Azmoun, B; Babintsev, V; Bai, M; Bai, X; Bandara, N; Bannier, B; Barish, K N; Baron, O; Bassalleck, B; Bathe, S; Baublis, V; Baumgart, S; Bazilevsky, A; Beaumier, M; Beckman, S; Belmont, R; Benjamin, G; Berdnikov, A; Berdnikov, Y; Blackburn, J; Blau, D S; Bobrek, M; Bok, J; Boose, S; Boyle, K; Britton,, C L; Brooks, M L; Bryslawskyj, J; Bumazhnov, V; Butler, C; Butsyk, S; Campbell, S; Carollo, A; Chai, J -S; Chen, C -H; Chernichenko, S; Chi, C Y; Chiu, M; Choi, I J; Choi, J B; Choi, S; Chollet, S; Christiansen, P; Chujo, T; Cianciolo, V; Citron, Z; Cole, B A; Cronin, N; Crossett, N; Csanád, M; D'Orazio, L; Dairaku, S; Danley, D; Datta, A; Daugherity, M S; David, G; DeBlasio, K; Debraine, A; Dehmelt, K; Denisov, A; Deshpande, A; Desmond, E J; Dietzsch, O; Ding, L; Dion, A; Diss, P B; Do, J H; Donadelli, M; Drapier, O; Drees, A; Drees, K A; Durham, J M; Durum, A; Eberle, L; Efremenko, Y V; Engelmore, T; Enokizono, A; Esumi, S; Eyser, K O; Fadem, B; Feege, N; Fields, D E; Finger, M; FingerJr., M; Fleuret, F; Fokin, S L; Frantz, J E; Franz, A; Frawley, A D; Fukao, Y; Fusayasu, T; Gainey, K; Gal, C; Gallus, P; Garg, P; Garishvili, A; Garishvili, I; Gastaldi, F; Ge, H; Giannotti, P; Giordarno, F; Glenn, A; Gong, X; Gonin, M; Goto, Y; de Cassagnac, R Granier; Grau, N; Greene, S V; Perdekamp, M Grosse; Gu, Y; Gunji, T; Guragain, H; Hachiya, T; Haggerty, J S; Hahn, K I; Hamagaki, H; Hamilton, H F; Han, S Y; Hanks, J; Hasegawa, S; Haseler, T O S; Hashimoto, K; Hayano, R; Hayashi, S; He, X; Hemmick, T K; Hester, T; Hill, J C; Hoefferkamp, M; Hollis, R S; Homma, K; Hong, B; Hori, Y; Hoshino, T; Huang, J; Huang, S; Hutchins, J R; Ichihara, T; Ikeda, Y; Imai, K; Imazu, Y; Imrek, J; Inaba, M; Iordanova, A; Isenhower, D; Isinhue, A; Isupov, A; Ivanischev, D; Ivanov, V; Jacak, B V; Jeon, S J; Jezghani, M; Jia, J; Jiang, X; Johnson, B M; Joo, K S; Jouan, D; Jumper, D S; Kamin, J; Kanda, S; Kang, B H; Kang, J H; Kang, J S; Kapustinsky, J; Karatsu, K; Kawall, D; Kazantsev, A V; Kehayias, H -J; Key, J A; Khachatryan, V; Khandai, P K; Khanzadeev, A; Kijima, K M; Kim, C; Kim, D H; Kim, D J; Kim, E -J; Kim, H J; Kim, K -B; Kim, M; Kim, Y -J; Kim, Y K; Kimelman, B; Kiss, Á; Kistenev, E; Kitamura, R; Klatsky, J; Kleinjan, D; Kline, P; Koblesky, T; Kochenda, L; Kofarago, M; Komatsu, Y; Komkov, B; Koster, J; Kotchetkov, D; Kotov, D; Kravtsov, P; Krizek, F; Kurita, K; Kuriyama, M; Kurosawa, M; Kwon, Y; Lacey, R; Lai, Y S; Lajoie, J G; Lebedev, A; Lee, G H; Lee, J; Lee, K B; Lee, K S; Lee, S; Lee, S H; Lefferts, R; Leitch, M J; Leite, M A L; Leitgab, M; Lewis, B; Li, X; Lim, S H; Lipski, A; Litvinenko, A; Liu, M X; Love, B; Lynch, D; Lynch, M; Maguire, C F; Makdisi, Y I; Makek, M; Malakhov, A; Manion, A; Manko, V I; Mannel, E; Maruyama, T; Masumoto, S; McCumber, M; McGaughey, P L; McGlinchey, D; McKay, R; McKinney, C; Meles, A; Mendoza, M; Menegasso, R; Meredith, B; Miake, Y; Mibe, T; Mignerey, A C; Milov, A; Mishra, D K; Mitchell, J T; Miyasaka, S; Mizuno, S; Mohanty, A K; Montuenga, P; Moon, T; Morrison, D P; Moskowitz, M; Motschwiller, S; Moukhanova, T V; Murakami, T; Murata, J; Mwai, A; Nagae, T; Nagamiya, S; Nagashima, K; Nagle, J L; Nagy, M I; Nakagawa, I; Nakagomi, H; Nakamiya, Y; Nakamura, K R; Nakamura, T; Nakano, K; Nattrass, C; Nederlof, A; Netrakanti, P K; Nihashi, M; Niida, T; Ninomiya, K; Nishimura, S; Northacker, D; Nouicer, R; Novak, T; Novitzky, N; Nukariya, A; Nyanin, A S; O'Brien, E; Ogilvie, C A; Oide, H; Okada, K; Koop, J D Orjuela; Osborn, J D; Oskarsson, A; Österman, L; Ozawa, K; Pancake, C; Pantuev, V; Papavassiliou, V; Park, I H; Park, J S; Park, S; Park, S K; Pate, S F; Patel, L; Patel, M; Peng, J -C; Perepelitsa, D; Perera, G D N; Peresedov, V; Peressounko, D Yu; Perry, J; Petti, R; Pinkenburg, C; Pinson, R; Pisani, R P; Popule, J; Purschke, M L; Qu, H; Radhakrishnan, S; Rak, J; Ramson, B J; Ravinovich, I; Read, K F; Reynolds, D; Reynolds, R; Riabov, V; Riabov, Y; Richardson, E; Rinn, T; Riveli, N; Roach, D; Rolnick, S D; Rosati, M; Roschin, E; Rowan, Z; Rubin, J G; Rukoyatkin, P; Ryu, M S; Safonov, A; Sahlmueller, B; Saito, N; Sakaguchi, T; Sako, H; Samsonov, V; Sano, M; Sarsour, M; Sato, S; Sawada, S; Schaefer, B; Schmoll, B K; Sedgwick, K; Seele, J; Seidl, R; Sekiguchi, Y; Sen, A; Seto, R; Sett, P; Sexton, A; Shafto, E; Sharma, D; Shaver, A; Shein, I; Shibata, T -A; Shigaki, K; Shimomura, M; Shoji, K; Shukla, P; Sicho, P; Sickles, A; Silva, C L; Silvermyr, D; Singh, B K; Singh, C P; Singh, V; Sippach, F W; Skolnik, M; Snowball, M; Solano, S; Soldatov, A; Soltz, R A; Sondheim, W E; Sorensen, S P; Soumya, M; Sourikova, I V; Stankus, P W; Steinberg, P; Stenlund, E; Stepanov, M; Ster, A; Stevens, L; Stoll, S P; Stone, M R; Sugitate, T; Sukhanov, A; Sumita, T; Sun, J; Sziklai, J; Takagui, E M

    2015-01-01

    In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

  2. LHCb: Upgrade of the LHCb calorimeter electronics

    CERN Multimedia

    Mauricio Ferre, J

    2013-01-01

    The LHCb collaboration foresees a major upgrade of the detector for the high luminosity run that should take place after 2018. Apart from the increase of the instantaneous luminosity at the interaction point of the experiment, one of the major ingredients of this upgrade is a full readout at 40MHz of the sub-detectors and the acquisition of the data by a large farm of PC. The trigger will be done by this farm and should increase the overall trigger efficiency with respect to the current detector, especially in hadronic B meson decays. A general overview of the modifications foreseen to the calorimeter system and the integration of the electromagnetic and hadronic calorimeters in this new scheme will be described.

  3. Particle combinations in the LHCb Upgrade trigger

    CERN Document Server

    Zhao, Fanyi

    2017-01-01

    The LHCb experiment will be upgraded during long shutdown II (2018-2020) to process inelastic proton-proton collisions at 30MHz in a software application and run at a higher instantaneous luminosity of $2\\times 10^{33}cm^{−2}s^{−1}$. Each of these collisions will contain substantially more proton-proton interactions and charged particles. It is important to identify the decay vertices of heavy-flavour hadrons produced by the primary proton-proton interaction in an efficient, CPU-performant manner. In this project, I will learn about the LHCb trigger and experimental programme and investigate alternative models for reconstructing these vertices, which may scale more efficiently to the upgraded trigger conditions than the current model.

  4. Social Upgrading in Developing Country Industrial Clusters

    DEFF Research Database (Denmark)

    Pyke, Frank; Lund-Thomsen, Peter

    2016-01-01

    In this article, we examine the role of social upgrading in developing country industrial clusters. We argue that while economic growth and productivity enhancement matter, social conditions within clusters are influenced by state monetary, fiscal, and labour policies and regulations, as well...... as by dynamic processes of agency among cluster governance actors. We find that the state's policies and regulations might enable or constrain cluster actors to behave in ways that affect social upgrading or downgrading. These policies and regulations may also be used by the state to directly change social...... conditions in national contexts, including in cluster settings, in order to further the government's overall economic strategy. The conclusion outlines our main findings, and the research and policy implications of our analysis....

  5. Primary Vertex Reconstruction for Upgrade at LHCb

    CERN Document Server

    Wanczyk, Joanna

    2016-01-01

    The aim of the LHCb experiment is the study of beauty and charm hadron decays with the main focus on CP violating phenomena and searches for physics beyond the Standard Model through rare decays. At the present, the second data taking period is ongoing, which is called Run II. After 2018 during the long shutdown, the replacement of signicant parts of the LHCb detector is planned. One of main changes is upgrade of the present software and hardware trigger to a more rapid full software trigger. Primary Vertex (PV) is a basis for the further tracking and it is sensitive to the LHC running conditions, which are going to change for the Upgrade. In particular, the center-of-mass collision energy should reach the maximum value of 14 TeV. As a result the quality of the reconstruction has to be studied and the reconstruction algorithms have to be optimized.

  6. Progress Towards Doubling the Beam Power at Fermilab's Accelerator Complex

    Energy Technology Data Exchange (ETDEWEB)

    Kourbanis, ioanis

    2014-06-01

    After a 14 month shutdown accelerator modifications and upgrades are in place to allow us doubling of the Main Injector beam power. We will discuss the past MI high power operation and the current progress towards doubling the power.

  7. Hydrogen as energy backup for the Hexicon : A case study on Malta

    OpenAIRE

    Rebello de Andrade, Filipe

    2013-01-01

    The island of Malta is highly reliant on fossil fuels for its power (99%), and due to climate mitigation policies implemented by EU the Maltese government is required to have 10% of its power generation from renewables by 2020. To achieve these energy goals, the Maltese government has expressed interest in investing on a Hexicon platform to produce 9% of the Maltese energy demand. The Hexicon platform is a floating structure capable of carrying a wide range of renewable energy generators. The...

  8. Kicker pulsers for recycler NOVA upgrades

    CERN Document Server

    Jensen, Chris C

    2015-01-01

    An upgrade of the Recycler injection kicker system required a faster rise time pulser. This system required a field rise and fall time of < 57 ns and a field flattop of 1.6 {\\mu}s. This paper describes the variety of improvements made over the years that have resulted in this latest thyratron pulser. The effects of the trigger, the reservoir and the load impedance on delay and rise time will be discussed.

  9. Upgrading the dosimetry at Ontario Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Hirning, C.R. [Ontario Hydro, Whitby, ON (Canada). Health Physics Dept.

    1996-12-01

    Ontario Hydro has embarked upon a major programme to replace and upgrade its external dosimetry systems. In two year`s time, the utility expects to have two state-of-the-art dosimetry systems in place: a new TLD dosimetry of legal record that was designed nearly 30 years ago; and an electronic dosimetry system which could eventually replace the TLD as the primary system. (Author).

  10. LHCb upgraded Muon System performance studies

    CERN Document Server

    Cogoni, V

    2016-01-01

    After the second Long Shutdown of the LHC scheduled for 2018–2020, LHCb will operate at an istantaneous luminosity of 2 · 10$^{33}$ cm$^{−2}$s$^{−1}$ and at a centre-of-mass energy of 14TeV. An overview of the LHCb Muon System Monte Carlo-based performance studies in upgrade conditions is presented.

  11. Seamounts, Direct Blast and Volume Reverberation Upgrades

    Science.gov (United States)

    1988-11-30

    Highway. Suits 1204. Arlington, VA 22202-4302. "n to the Office of Management and Budget. Peperworik Reduction Project (0704-0188). Washington. DC 2050M. 1...Subtitle. 5. Funding Numbers. Seamounts, Direct Blast And Volume Reverberation Upgrades proram Eemen No 3 7 85N Project No R02017 6. Author(s). L...Section Pae 1 INTRODUCTION ................................. 1-1 2 ASERT: DATA PREPARATION FOR ASTRAL ........... 2-1 2.1 Overview and Purpose of

  12. Upgrading hydro-electric generating facilities

    Energy Technology Data Exchange (ETDEWEB)

    Coulson, D.M.; Villalon, M.

    1987-11-01

    Approximately 1,720,000 kW of installed hydro-electric generating capacity is either owned directly by pulp and paper companies in Canada or is operated principally in their service. The 216 units involved were commissioned between 1902 and 1982. This paper suggests an approach to upgrading the generating units themselves as well as the related electrical and mechanical equipment and civil structures, giving approximate durations and costs. A complete system study is recommended. 2 refs., 2 figs., 3 tabs.

  13. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Carrio, F

    2015-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (P hase - II ) where the pea k luminosity will increase 5 times compared to the design luminosity (10 34 cm −2 s −1 ) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity levelling. This upgrade is expe cted to happen around 202 4 . The TileCal upgrade aims at replacing the majority of the on - and off - detector electronics to the extent that all calorimeter signals will be digitized and sent to the off - detector electronics in the counting room. To achieve th e required reliability, redundancy has been introduced at different levels. Three different options are presently being investiga...

  14. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Souza, J; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5-fold compared to the design luminosity (10exp34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2023. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. The smallest independent on-detector electronics module has been reduced from 45 channels to 6, greatly reducing the consequences of a failure in the on-detector electronics. The size of t...

  15. The APS control system network upgrade.

    Energy Technology Data Exchange (ETDEWEB)

    Sidorowicz, K. v.; Leibfritz, D.; McDowell, W. P.

    1999-10-22

    When it was installed,the Advanced Photon Source (APS) control system network was at the state-of-the-art. Different aspects of the system have been reported at previous meetings [1,2]. As loads on the controls network have increased due to newer and faster workstations and front-end computers, we have found performance of the system declining and have implemented an upgraded network. There have been dramatic advances in networking hardware in the last several years. The upgraded APS controls network replaces the original FDDI backbone and shared Ethernet hubs with redundant gigabit uplinks and fully switched 10/100 Ethernet switches with backplane fabrics in excess of 20 Gbits/s (Gbps). The central collapsed backbone FDDI concentrator has been replaced with a Gigabit Ethernet switch with greater than 30 Gbps backplane fabric. Full redundancy of the system has been maintained. This paper will discuss this upgrade and include performance data and performance comparisons with the original network.

  16. ATLAS Upgrades for the next Decades

    CERN Document Server

    Gregor, I M; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly fo...

  17. ATLAS upgrades for the next decades

    CERN Document Server

    Hopkins, Walter

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb$^{-1}$ to 3000 fb$^{-1}$ by around 2035 for ATLAS and CMS. In parallel, the experiments need to be kept lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tr...

  18. ATLAS upgrades for the next decades

    CERN Document Server

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred \\ifb\\ expected for LHC running to 3000 fb$^{-1}$ by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for...

  19. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Reed, Robert; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the main hadronic calorimeter covering the central region of the ATLAS experiment at LHC. TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC operation (Phase 2 around 2023) where the peak luminosity will increase 5x compared to the design luminosity (10^{34} cm^{-2}s^{-1}) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims to replace the majority of the on- and off-detector electronics so that all calorimeter signals can be digitized and directly sent to the off-detector electronics in the counting room. This will reduce pile-up problems and allow more complex trigger algorithms. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to t...

  20. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (Phase 2) where the peak luminosity will increase 5$\\times$ compared to the design luminosity ($10^{34} cm^{-2}s^{-1}$) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to the counting room while 5 Gbps down-links are used for synchronization, c...