  1. Achieving safety/risk goals for less ATR backup power upgrades

    International Nuclear Information System (INIS)

    Atkinson, S.A.

    1995-01-01

    The Advanced Test Reactor probabilistic risk assessment for internal fire and flood events defined a relatively high risk for a total loss of electric power possibly leading to core damage. Backup power sources were disabled due to fire and flooding in the diesel generator area with propagation of the flooding to a common switchgear room. The ATR risk assessment was employed to define options for relocation of backup power system components to achieve needed risk reduction while minimizing costs. The risk evaluations were performed using sensitivity studies and importance measures. The risk-based evaluations of relocation options for backup power systems saved over $3 million from what might have been otherwise considered open-quotes necessaryclose quotes for safety/risk improvement. The ATR experience shows that the advantages of a good risk assessment are to define risk significance, risk specifics, and risk solutions which enable risk goals to be achieved at the lowest cost

  2. Acceptance test report: Backup power system

    International Nuclear Information System (INIS)

    Cole, D.B.

    1996-01-01

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control

  3. 47 CFR 12.2 - Backup power.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Backup power. 12.2 Section 12.2 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL REDUNDANCY OF COMMUNICATIONS SYSTEMS § 12.2 Backup power..., must have an emergency backup power source (e.g., batteries, generators, fuel cells) for all assets...

  4. Backup power sources for DOE facilities

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This standard establishes fundamental requirements and guidance for backup power sources at DOE facilities. Purpose is to document good engineering practices for installation, testing, and maintenance of these backup power sources, which also covers emergency power sources. Examples are those which supply power to nuclear safety systems, radiation monitors and alarms, fire protection systems, security systems, and emergency lighting.

  5. Fuel Cells for Backup Power in Telecommunications Facilities (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2009-04-01

    Telecommunications providers rely on backup power to maintain a constant power supply, to prevent power outages, and to ensure the operability of cell towers, equipment, and networks. The backup power supply that best meets these objectives is fuel cell technology.

  6. Military power requirements and backup power considerations

    International Nuclear Information System (INIS)

    Botts, T.E.

    1986-01-01

    All US Air Force (USAF) facilities have certain critical power requirements that must be met in order to carry out their mission successfully. Internal USAF studies have shown that the mission can degrade precipitously as the available power decreases below the mission critical level. Now, more than ever before, the military and private industry are finding that certain functions, such as automated data processing and automated process control, respond catastrophically to power reductions. Furthermore, increased reliance on electrical power means, in the case of the Air Force, that critical power requirements are anticipated to increase by half over the next 15 yr. For these reasons and others, the USAF is investigating several means of improving the availability of electric power under adverse conditions above that which can be provided by an off-base supplier. Among the approaches to this problem being pursued at this time are a program to improve all sorts of generator sets on a service-wide basis and the Multimegawatt Terrestrial Power (MTP) Program, which is pursuing the design and testing of a small dedicated nuclear power source to provide critical mission power. The purpose of this paper is to provide some insight into some of the issues associated with USAF power programs

  7. Lifetime prognostics of hybrid backup power system

    DEFF Research Database (Denmark)

    Sønderskov, Simon Dyhr; Swierczynski, Maciej Jozef; Munk-Nielsen, Stig

    2017-01-01

    Modern telecommunication power supplies are based on renewable solutions, e.g. fuel cell/battery hybrid systems, for immediate and prolonged load support during grid faults. The high demand for power continuity increases the emphasis on power supply reliability and availability which raises...... the need for monitoring the system condition for timely maintenance and prevention of downtime. Although present on component level, no current literature addresses the condition monitoring from the perspective of a fuel cell/battery hybrid system such as the telecommunication power supply. This paper...... components: fuel cell, battery, and converters, is given. Finally, the paper presents a discussion on the available monitoring techniques from a commercial hybrid system point view....

  8. Zinc Bromide Flow Battery Installation for Islanding and Backup Power

    Science.gov (United States)

    2017-08-09

    demonstrates the energy security and cost benefits of implementing a Zn/Br Flow Battery-based ESS at the Marine Corps Air Station (MCAS) located at...user will be realized through the system’s peak shaving mode. This benefit was also used to calculate the operational cost reductions when using the...EW-201242) Zinc Bromide Flow Battery Installation for Islanding and Backup Power August 2017 This document has been cleared for public release

  9. Accelerating Acceptance of Fuel Cell Backup Power Systems - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Petrecky, James; Ashley, Christopher

    2014-07-21

    Since 2001, Plug Power has installed more than 800 stationary fuel cell systems worldwide. Plug Power’s prime power systems have produced approximately 6.5 million kilowatt hours of electricity and have accumulated more than 2.5 million operating hours. Intermittent, or backup, power products have been deployed with telecommunications carriers and government and utility customers in North and South America, Europe, the United Kingdom, Japan and South Africa. Some of the largest material handling operations in North America are currently using the company’s motive power units in fuel cell-powered forklifts for their warehouses, distribution centers and manufacturing facilities. The low-temperature GenSys fuel cell system provides remote, off-grid and primary power where grid power is unreliable or nonexistent. Built reliable and designed rugged, low- temperature GenSys delivers continuous or backup power through even the most extreme conditions. Coupled with high-efficiency ratings, low-temperature GenSys reduces operating costs making it an economical solution for prime power requirements. Currently, field trials at telecommunication and industrial sites across the globe are proving the advantages of fuel cells—lower maintenance, fuel costs and emissions, as well as longer life—compared with traditional internal combustion engines.

  10. Fuel Cell Backup Power System for Grid Service and Micro-Grid in Telecommunication Applications: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Ma, Zhiwen [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Eichman, Joshua D [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kurtz, Jennifer M [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-22

    This paper presents the feasibility and economics of using fuel cell backup power systems in telecommunication cell towers to provide grid services (e.g., ancillary services, demand response). The fuel cells are able to provide power for the cell tower during emergency conditions. This study evaluates the strategic integration of clean, efficient, and reliable fuel cell systems with the grid for improved economic benefits. The backup systems have potential as enhanced capability through information exchanges with the power grid to add value as grid services that depend on location and time. The economic analysis has been focused on the potential revenue for distributed telecommunications fuel cell backup units to provide value-added power supply. This paper shows case studies on current fuel cell backup power locations and regional grid service programs. The grid service benefits and system configurations for different operation modes provide opportunities for expanding backup fuel cell applications responsive to grid needs.

  11. Hydrogen Fuel Cell Performance as Telecommunications Backup Power in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States); Saur, Genevieve [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sprik, Sam [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-03-01

    Working in collaboration with the U.S. Department of Energy (DOE) and industry project partners, the National Renewable Energy Laboratory (NREL) acts as the central data repository for the data collected from real-world operation of fuel cell backup power systems. With American Recovery and Reinvestment Act of 2009 (ARRA) co-funding awarded through DOE's Fuel Cell Technologies Office, more than 1,300 fuel cell units were deployed over a three-plus-year period in stationary, material handling equipment, auxiliary power, and backup power applications. This surpassed a Fuel Cell Technologies Office ARRA objective to spur commercialization of an early market technology by installing 1,000 fuel cell units across several different applications, including backup power. By December 2013, 852 backup power units out of 1,330 fuel cell units deployed were providing backup service, mainly for telecommunications towers. For 136 of the fuel cell backup units, project participants provided detailed operational data to the National Fuel Cell Technology Evaluation Center for analysis by NREL's technology validation team. NREL analyzed operational data collected from these government co-funded demonstration projects to characterize key fuel cell backup power performance metrics, including reliability and operation trends, and to highlight the business case for using fuel cells in these early market applications. NREL's analyses include these critical metrics, along with deployment, U.S. grid outage statistics, and infrastructure operation.

  12. Compressed-air and backup nitrogen systems in nuclear power plants

    International Nuclear Information System (INIS)

    Hagen, E.W.

    1982-07-01

    This report reviews and evaluates the performance of the compressed-air and pressurized-nitrogen gas systems in commercial nuclear power units. The information was collected from readily available operating experiences, licensee event reports, system designs in safety analysis reports, and regulatory documents. The results are collated and analyzed for significance and impact on power plant safety performance. Under certain circumstances, the fail-safe philosophy for a piece of equipment or subsystem of the compressed-air systems initiated a series of actions culminating in reactor transient or unit scram. However, based on this study of prevailing operating experiences, reclassifying the compressed-gas systems to a higher safety level will neither prevent (nor mitigate) the reoccurrences of such happenings nor alleviate nuclear power plant problems caused by inadequate maintenance, operating procedures, and/or practices. Conversely, because most of the problems were derived from the sources listed previously, upgrading of both maintenance and operating procedures will not only result in substantial improvement in the performance and availability of the compressed-air (and backup nitrogen) systems but in improved overall plant performance

  13. Emergency and backup power supplies at Department of Energy facilities: Augmented Evaluation Team -- Final report

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This report documents the results of the Defense Programs (DP) Augmented Evaluation Team (AET) review of emergency and backup power supplies (i.e., generator, uninterruptible power supply, and battery systems) at DP facilities. The review was conducted in response to concerns expressed by former Secretary of Energy James D. Watkins over the number of incidents where backup power sources failed to provide electrical power during tests or actual demands. The AET conducted a series of on-site reviews for the purpose of understanding the design, operation, maintenance, and safety significance of emergency and backup power (E&BP) supplies. The AET found that the quality of programs related to maintenance of backup power systems varies greatly among the sites visited, and often among facilities at the same site. No major safety issues were identified. However, there are areas where the AET believes the reliability of emergency and backup power systems can and should be improved. Recommendations for improving the performance of E&BP systems are provided in this report. The report also discusses progress made by Management and Operating (M&O) contractors to improve the reliability of backup sources used in safety significant applications. One area that requires further attention is the analysis and understanding of the safety implications of backup power equipment. This understanding is needed for proper graded-approach implementation of Department of Energy (DOE) Orders, and to help ensure that equipment important to the safety of DOE workers, the public, and the environment is identified, classified, recognized, and treated as such by designers, users, and maintainers. Another area considered important for improving E&BP system performance is the assignment of overall ownership responsibility and authority for ensuring that E&BP equipment performs adequately and that reliability and availability are maintained at acceptable levels.

  14. Backup power working group best practices handbook for maintenance and operation of engine generators, Volume 1. Revision 1

    International Nuclear Information System (INIS)

    Gross, R.; Padgett, A.B.; Burrows, K.P.; Fairchild, P.N.; Lam, T.; Janes, J.

    1997-01-01

    This handbook is divided into the four chapters. Chapter one covers the design, procurement, storage, handling and testing of diesel fuel oil to be used in DOE backup power supplies. Chapter two discusses the selection of automatic transfer switches to be used in DOE backup power supplies. Chapter three is about low voltage open frame air circuit breaker operation, testing, and maintenance for DOE backup power supplies. And chapter four covers installation, design, and maintenance of engine cooling water and jacket water systems

  15. Reliability considerations of a fuel cell backup power system for telecom applications

    Science.gov (United States)

    Serincan, Mustafa Fazil

    2016-03-01

    A commercial fuel cell backup power unit is tested in real life operating conditions at a base station of a Turkish telecom operator. The fuel cell system responds to 256 of 260 electric power outages successfully, providing the required power to the base station. Reliability of the fuel cell backup power unit is found to be 98.5% at the system level. On the other hand, a qualitative reliability analysis at the component level is carried out. Implications of the power management algorithm on reliability is discussed. Moreover, integration of the backup power unit to the base station ecosystem is reviewed in the context of reliability. Impact of inverter design on the stability of the output power is outlined. Significant current harmonics are encountered when a generic inverter is used. However, ripples are attenuated significantly when a custom design inverter is used. Further, fault conditions are considered for real world case studies such as running out of hydrogen, a malfunction in the system, or an unprecedented operating scheme. Some design guidelines are suggested for hybridization of the backup power unit for an uninterrupted operation.

  16. 77 FR 28797 - Redundancy of Communications Systems: Backup Power Private Land Mobile Radio Services: Selection...

    Science.gov (United States)

    2012-05-16

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Parts 12 and 90 [DA 11-1838] Redundancy of Communications Systems: Backup Power Private Land Mobile Radio Services: Selection and Assignment of Frequencies, and Transition of the Upper 200 Channels in the 800 MHz Band to EA Licensing AGENCY: Federal Communications...

  17. Lithium Ion Battery Chemistries from Renewable Energy Storage to Automotive and Back-up Power Applications

    DEFF Research Database (Denmark)

    Stan, Ana-Irina; Swierczynski, Maciej Jozef; Stroe, Daniel Ioan

    2014-01-01

    Lithium ion (Li-ion) batteries have been extensively used in consumer electronics because of their characteristics, such as high efficiency, long life, and high gravimetric and volumetric energy. In addition, Li-ion batteries are becoming the most attractive candidate as electrochemical storage...... systems for stationary applications, as well as power source for sustainable automotive and back-up power supply applications. This paper gives an overview of the Li-ion battery chemistries that are available at present in the market, and describes the three out of four main applications (except...... the consumers’ applications), grid support, automotive, and back-up power, for which the Li-ion batteries are suitable. Each of these applications has its own specifications and thus, the chemistry of the Li-ion battery should be chosen to fulfil the requirements of the corresponding application. Consequently...

  18. High Flux Isotope Reactor power upgrade status

    International Nuclear Information System (INIS)

    Rothrock, R.B.; Hale, R.E.; Cheverton, R.D.

    1997-01-01

    A return to 100-MW operation is being planned for the High Flux Isotope Reactor (HFIR). Recent improvements in fuel element manufacturing procedures and inspection equipment will be exploited to reduce hot spot and hot streak factors sufficiently to permit the power upgrade without an increase in primary coolant pressure. Fresh fuel elements already fabricated for future use are being evaluated individually for power upgrade potential based on their measured coolant channel dimensions

  19. Pulsed power supply for Nova Upgrade

    International Nuclear Information System (INIS)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C.

    1992-01-01

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 μm light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps

  20. Fuel Cell Backup Power Unit Configuration and Electricity Market Participation: A Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Ma, Zhiwen [National Renewable Energy Lab. (NREL), Golden, CO (United States); Eichman, Josh [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kurtz, Jennifer [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-03-13

    This National Renewable Energy Laboratory industry-inspired Laboratory Directed Research and Development project evaluates the feasibility and economics of using fuel cell backup power systems in cell towers to provide grid services (e.g., balancing, ancillary services, demand response). The work is intended to evaluate the integration of thousands of under-utilized, clean, efficient, and reliable fuel cell systems that are already installed in cell towers for potential grid and ancillary services.

  1. Degradation Effect on Reliability Evaluation of Aluminum Electrolytic Capacitor in Backup Power Converter

    DEFF Research Database (Denmark)

    Zhou, Dao; Wang, Huai; Blaabjerg, Frede

    2017-01-01

    DC capacitors in power electronic converters are a major constraint on improvement of power density as well as reliability. In this paper, according to the degradation data of electrolytic capacitors through the accelerated test, the time-to-failure of the capacitor cell is acquired and it can...... be further extended to lower stress levels. Then, in a case study of a fuel cell backup power application, the mission profile based lifetime expectancy of the individual capacitor and the capacitor bank is estimated in terms of the standby mode and operation mode. The lifetime prediction of the capacitor...

  2. ALICE upgrades its powerful eyes

    CERN Multimedia

    Yuri Kharlov, ALICE Collaboration

    2013-01-01

    The ALICE Photon Spectrometer (PHOS) is a high-resolution photon detector that measures the photons coming out of the extremely hot plasma created in the lead-lead collisions at the LHC. Taking advantage of the long accelerator shut-down, the ALICE teams are now repairing and upgrading the existing modules and getting ready to install the brand-new module in time for the next run. The upgraded PHOS detector will be faster and more stable with wider acceptance and improved photon identification.   PHOS crystal matrix during repair. The key feature and the main complexity of the ALICE PHOS detector is that it operates at a temperature of -25°C, which makes it the second-coldest equipment element at the LHC after the cryogenic superconducting magnets. Since 2009 when it was installed, the PHOS detector, with its cold and warm volumes, has been immersed in airtight boxes to avoid condensation in the cold volumes. The 10,752 lead tungstate crystals of the PHOS were completely insulated fr...

  3. Characteristics of a lithium-thionyl chloride battery as a memory back-up power source

    Science.gov (United States)

    Iwamaru, T.; Uetani, Y.

    An Li/SOCl 2 battery of R6 size (ER6C) has been evaluated as a memory back-up power source for CMOS RAM. The working voltage is 3.6 V and the discharge capacity is 1900 mA h on a 1OK-ohm load. The cell exhibits satisfactory working voltage and discharge capacity over the temperature range -40 °C to 85 °C. The discharge reaction mechanism has been elucidated. Cumulative self discharge during 10 years discharge at 20 μA is estimated to be 3.5%. No serious problems have been observed during abuse tests.

  4. Characteristics of a lithium-thionyl chloride battery as a memory back-up power source

    Energy Technology Data Exchange (ETDEWEB)

    Iwamaru, T.; Uetani, Y.

    1987-05-01

    An Li/SOCl/sub 2/ battery of R6 size (ER6C) has been evaluated as a memory back-up power source for CMOS RAM. The working voltage is 3.6 V and the discharge capacity is 1900 mA h on a 10K-ohm load. The cell exhibits satisfactory working voltage and discharge capacity over the temperature range -40/sup 0/C to 85/sup 0/C. The discharge reaction mechanism has been elucidated. Cumulative self discharge during 10 years discharge at 20 ..mu..A is estimated to be 3.5%. No serious problems have been observed during abuse tests.

  5. Feasibility analysis of a hydrogen backup power system for Russian telecom market

    Science.gov (United States)

    Borzenko, V. I.; Dunikov, D. O.

    2017-11-01

    We performed feasibility analysis of 10 kW hydrogen backup power system (H2BS) consisting of a water electrolyzer, a metal hydride hydrogen storage and a fuel cell. Capital investments in H2BS are mostly determined by the costs of the PEM electrolyzer, the fuel cell and solid state hydrogen storage materials, for single unit or small series manufacture the cost of AB5-type intermetallic compound can reach 50% of total system cost. Today the capital investments in H2BS are 3 times higher than in conventional lead-acid system of the same capacity. Wide distribution of fuel cell hydrogen vehicles, development of hydrogen infrastructure, and mass production of hydrogen power systems will for sure lower capital investments in fuel cell backup power. Operational expenditures for H2BS is only 15% from the expenditures for lead acid systems, and after 4-5 years of exploitation the total cost of ownership will become lower than for batteries.

  6. Lithium-ion backup batteries for coping extended loss of AC power (ELAP)

    International Nuclear Information System (INIS)

    Chang, Choong-koo

    2017-01-01

    Per NRC Regulations Title 10, Code of Federal Regulations (CFR) 50.63 'Loss of all alternating current power' all Korean nuclear power plants have a coping capability for SBO conditions for a limited time ranging from approximately eight (8) to sixteen (16) hours. The 125V DC systems are designed for eight (8) hours range except Class 1E channel A and B 125V DC system of which duty cycle is 2 hours in APR1400. The strategies proposed by this paper for coping extended loss of AC power (ELAP) involve a three-phase approach. In the first extend class 1E batteries' backup time until 24 hours. Then augment class 1E batteries with Lithium-ion batteries by 72 hours from the event initiation. In addition, obtain additional capability and redundancy from off-site equipment until power systems are restored or commissioned. (author)

  7. Constitutional determinants of nuclear power plant upgrading

    International Nuclear Information System (INIS)

    Mann, Thomas

    2013-01-01

    Around half a year ago the European stress test for nuclear power plants, a precautionary measure initiated by the European Council in March 2011 in response to the Fukushima disaster, revealed that while German nuclear power plants show a high degree of robustness compared with those in other European countries, they nevertheless required upgrading in one or the other respect (earthquake warning systems, protection against crashing civil passenger airplanes). The present article investigates whether this upgrading requirement can justify an injunction to carry out structural retrofitting measures or whether obligations to this end can be excluded on grounds of reasonability in view of the recent decision taken by the German parliament to phase out nuclear energy.

  8. Bohunice Nuclear Power Plant Safety Upgrading Program

    International Nuclear Information System (INIS)

    Toth, A.; Fagula, L.

    1996-01-01

    Bohunice nuclear Power Plant generation represents almost 50% of the Slovak republic electric power production. Due to such high level of commitment to nuclear power in the power generation system, a special attention is given to safe and reliable operation of NPPs. Safety upgrading and operational reliability improvement of Bohunice V-1 NPP was carried out by the Bohunice staff continuously since the plant commissioning. In the 1990 - 1993 period extensive projects were realised. As a result of 'Small Reconstruction of the Bohunice V-1 NPP', the standards of both the nuclear safety and operational reliability have been significantly improved. The implementation of another modifications that will take place gradually during extended refuelling outages and overhauls in the course of 1996 through 1999, is referred to as the Gradual Reconstruction of the Bohunice V-1 Plant. The general goal of the V-1 NPP safety upgrading is the achievement of internationally acceptable level of nuclear safety. Extensive and financially demanding modification process of Bohunice V-2 NPP is likely to be implemented after a completion of the Gradual Reconstruction of the Bohunice V-1 NPP, since the year 1999. With this in mind, a first draft of the strategy of the Bohunice V-2 NPP upgrading program based on Probabilistic Safety assessment consideration was developed. A number of actions with a general effect on Bohunice site safety is evident. All these activities are aimed at reaching the essential objective of Bohunice NPP Management - to ensure a safe, reliable and effective electric energy and heat generation at the Bohunice site. (author)

  9. Upgrading the TFTR Transrex Power Supplies

    International Nuclear Information System (INIS)

    Lawson, J.E.; Marsala, R; Ramakrishnan, S.; Zhao, X.; Sichta, P.

    2009-01-01

    In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supply sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the 'Hardwired Control System' will be replaces with a Programmable Logic Controller (PLC)

  10. Upgrade of the Nuclotron power supply

    International Nuclear Information System (INIS)

    Karpinskij, V.N.; Kondrat'ev, N.G.; Osipenkov, A.L.

    2010-01-01

    One of topics of the Nuclotron development is the modification of its power supply scheme and upgrade of the energy evacuation system aimed to provide long and safe operation of the Nuclotron at the dipole magnetic field up to 2 T. It is necessary for the Nuclotron operation as a part of injection chain of the heavy ion collider under design at JINR as well as for fulfillment of its current scientific program. In the report the structure and peculiarity of the existing power supply system are described. The existing system is based on separated supply of dipole magnets and quadrupole lenses. General goals of the power supply modification are described, structural and principal schemes of the power supply, control system and the schemes of the energy evacuation key are presented

  11. Effect of Remote Back-Up Protection System Failure on the Optimum Routine Test Time Interval of Power System Protection

    Directory of Open Access Journals (Sweden)

    Y Damchi

    2013-12-01

    Full Text Available Appropriate operation of protection system is one of the effective factors to have a desirable reliability in power systems, which vitally needs routine test of protection system. Precise determination of optimum routine test time interval (ORTTI plays a vital role in predicting the maintenance costs of protection system. In the most previous studies, ORTTI has been determined while remote back-up protection system was considered fully reliable. This assumption is not exactly correct since remote back-up protection system may operate incorrectly or fail to operate, the same as the primary protection system. Therefore, in order to determine the ORTTI, an extended Markov model is proposed in this paper considering failure probability for remote back-up protection system. In the proposed Markov model of the protection systems, monitoring facility is taken into account. Moreover, it is assumed that the primary and back-up protection systems are maintained simultaneously. Results show that the effect of remote back-up protection system failures on the reliability indices and optimum routine test intervals of protection system is considerable.

  12. Compact modeling of a telecom back-up unit powered by air-cooled proton exchange membrane fuel cell

    DEFF Research Database (Denmark)

    Gao, Xin; Kær, Søren Knudsen

    2018-01-01

    Applications of proton exchange membrane fuel cells (PEMFC’s) are expanding in portable, automotive and stationary markets. One promising application is the back-up power for telecommunication applications in remote areas where usually air-cooled PMEFC’s are used. An air-cooled PEMFC system is much...

  13. Performance model to assist solar thermal power plant siting in northern Chile based on backup fuel consumption

    Energy Technology Data Exchange (ETDEWEB)

    Larrain, Teresita; Escobar, Rodrigo; Vergara, Julio [Departamento de Ingenieria Mecanica y Metalurgica, Pontificia Universidad Catolica de Chile, Vicuna Mackenna 4860, Macul, Santiago (Chile)

    2010-08-15

    In response to environmental awareness, Chile introduced sustainability goals in its electricity law. Power producers must deliver 5% from renewable sources by 2010 and 10% by 2024. The Chilean desert has a large available surface with one of the highest radiation levels and clearest skies in the World. These factors imply that solar power is an option for this task. However, a commercial plant requires a fossil fuel system to backup the sunlight intermittency. The authors developed a thermodynamical model to estimate the backup fraction needed in a 100 MW hybrid -solar-fossil- parabolic trough power plant. This paper presents the model aiming to predicting the performance and exploring its usefulness in assisting site selection among four locations. Since solar radiation data are only available in a monthly average, we introduced two approaches to feed the model. One data set provided an average month with identical days throughout and the other one considered an artificial month of different daylight profiles on an hourly basis for the same monthly average. We recommend a best plant location based on minimum fossil fuel backup, contributing to optimal siting from the energy perspective. Utilities will refine their policy goals more closely when a precise solar energy data set becomes available. (author)

  14. A portable backup power supply to assure extended decay heat removal during natural phenomena-induced station blackout

    International Nuclear Information System (INIS)

    Proctor, L.D.; Merryman, L.D.; Sallee, W.E.

    1989-01-01

    The High Flux Isotope Reactor (HFIR) is a light water cooled and moderated flux-trap type research reactor located at Oak Ridge National Laboratory (ORNL). Coolant circulation following reactor shutdown is provided by the primary coolant pumps. DC-powered pony motors drive these pumps at a reduced flow rate following shutdown of the normal ac-powered motors. Forced circulation decay heat removal is required for several hours to preclude core damage following shutdown. Recent analyses identified a potential vulnerability due to a natural phenomena-induced station blackout. Neither the offsire power supply nor the onsite emergency diesel generators are designed to withstand the effects of seismic events or tornadoes. It could not be assured that the capacity of the dedicated batteries provided as a backup power supply for the primary coolant pump pony motors is adequate to provide forced circulation cooling for the required time following such events. A portable backup power supply added to the plant to address this potential vulnerability is described

  15. Shielding assessment of the ETRR-1 Reactor Under power upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Ahmad, E E [Reactor Department, Nuclear Research Center, Atomic Energy Authority, Cairo (Egypt)

    1997-12-31

    The assessment of existing shielding of the ETRR-1 reactor in case of power upgrading is presented and discussed. It was carried out using both the present EK-10 type fuel elements and some other types of fuel elements with different enrichments. The shielding requirements for the ETRR-1 when power is upgraded are also discussed. The optimization curves between the upgraded reactor power and the shield thickness are presented. The calculation have been made using the ANISN code with the DLC-75 data library. The results showed that the present shield necessitates an additional layer of steel with thickness of 10.20 and 25 cm. When its power is upgraded to 3, 6 and 10 MWt in order to cutoff all neutron energy groups to be adequately safe under normal operating conditions. 4 figs.

  16. Data acquisition and PV module power production in upgraded TEP/AzRISE solar test yard

    Science.gov (United States)

    Bennett, Whit E.; Fishgold, Asher D.; Lai, Teh; Potter, Barrett G.; Simmons-Potter, Kelly

    2017-08-01

    The Tucson Electric Power (TEP)/University of Arizona AzRISE (Arizona Research Institute for Solar Energy) solar test yard is continuing efforts to improve standardization and data acquisition reliability throughout the facility. Data reliability is ensured through temperature-insensitive data acquisition devices with battery backups in the upgraded test yard. Software improvements allow for real-time analysis of collected data, while uploading to a web server. Sample data illustrates high fidelity monitoring of the burn-in period of a polycrystalline silicon photovoltaic module test string with no data failures over 365 days of data collection. In addition to improved DAQ systems, precision temperature monitoring has been implemented so that PV module backside temperatures are routinely obtained. Weather station data acquired at the test yard provides local ambient temperature, humidity, wind speed, and irradiance measurements that have been utilized to enable characterization of PV module performance over an extended test period

  17. Feasibility study for Tehran Research Reactor power upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Farhadi, Kazem [Nuclear Research Center, Atomic Energy Organization of Iran (AEOI), Tehran (Iran, Islamic Republic of)], E-mail: kfarhadi@aeoi.org.ir; Khakshournia, Samad [Nuclear Research Center, Atomic Energy Organization of Iran (AEOI), Tehran (Iran, Islamic Republic of)

    2008-07-15

    The present work is concerned with a power upgrading study of Tehran Research Reactor (TRR). The upgrading study is aimed at investigating the possibility of raising power of the TRR from the current level of 5 MW{sub th} to a higher level without violating the original thermal-hydraulic safety criteria. The existing core, comprising 22 standard fuel elements and five control fuel elements, is used for the analyses. Different reactor thermal powers (5-11 MW) and different core coolant flow rates (500-921 m{sup 3}/h) are considered. It is shown that, for the present core, this goal could be achieved safely by gradually opening the butterfly control valve until the desired coolant flow rate is reached. The TRR power could be upgraded up to around 7.5 MW{sub th} with the total power peaking factor maintained at less than or equal to 3.0.

  18. Feasibility study for Tehran Research Reactor power upgrading

    International Nuclear Information System (INIS)

    Farhadi, Kazem; Khakshournia, Samad

    2008-01-01

    The present work is concerned with a power upgrading study of Tehran Research Reactor (TRR). The upgrading study is aimed at investigating the possibility of raising power of the TRR from the current level of 5 MW th to a higher level without violating the original thermal-hydraulic safety criteria. The existing core, comprising 22 standard fuel elements and five control fuel elements, is used for the analyses. Different reactor thermal powers (5-11 MW) and different core coolant flow rates (500-921 m 3 /h) are considered. It is shown that, for the present core, this goal could be achieved safely by gradually opening the butterfly control valve until the desired coolant flow rate is reached. The TRR power could be upgraded up to around 7.5 MW th with the total power peaking factor maintained at less than or equal to 3.0

  19. Life cycle assessment of greenhouse gas emissions, water and land use for concentrated solar power plants with different energy backup systems

    International Nuclear Information System (INIS)

    Klein, Sharon J.W.; Rubin, Edward S.

    2013-01-01

    Concentrated solar power (CSP) is unique among intermittent renewable energy options because for the past four years, utility-scale plants have been using an energy storage technology that could allow a CSP plant to operate as a baseload renewable energy generator in the future. No study to-date has directly compared the environmental implications of this technology with more conventional CSP backup energy options. This study compares the life cycle greenhouse gas (GHG) emissions, water consumption, and direct, onsite land use associated with one MW h of electricity production from CSP plants with wet and dry cooling and with three energy backup systems: (1) minimal backup (MB), (2) molten salt thermal energy storage (TES), and (3) a natural gas-fired heat transfer fluid heater (NG). Plants with NG had 4–9 times more life cycle GHG emissions than plants with TES. Plants with TES generally had twice as many life cycle GHG emissions as the MB plants. Dry cooling reduced life cycle water consumption by 71–78% compared to wet cooling. Plants with larger backup capacities had greater life cycle water consumption than plants with smaller backup capacities, and plants with NG had lower direct, onsite life cycle land use than plants with MB or TES. - highlights: • We assess life cycle environmental effects of concentrated solar power (CSP). • We compare CSP with three energy backup technologies and two cooling technologies. • We selected solar field area to minimize energy cost for plants with minimal backup and salt storage. • Life cycle greenhouse gas emissions were 4–9 times lower with thermal energy storage than with fossil fuel backup. • Dry cooling reduced life cycle water use by 71–78% compared to wet cooling

  20. Upgrading Atucha 1 nuclear power plant. Regulatory perspective

    International Nuclear Information System (INIS)

    Caruso, G.

    1998-01-01

    Atucha 1 nuclear power plant has unique design and its commercial operation started in 1974. The upgrading decisions, the basis for an upgrading program and its status of implementation are presented. Regulatory decisions derived from the performance-based approach have the advantage that they enable balancing of the overall plant risk and identifying at different plant levels the areas where improvements are necessary. (author)

  1. CanDan 2, phase 2. Final report. [Fuel cell systems for back-up power and materials handling applications]; CanDan 2, fase 2. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-11-01

    CanDan 2 Phase 2 is the second phase of a research and demonstration project for fuel cell backup power systems and fuel cell powered material handling equipment. In the Backup Power segment the fuel cell units have been developed, certified and delivered. A total of 32 fuel cell backup power systems have been delivered for EnergiMidt and in operation since early 2011. Following this project EnergiMidt has purchased another 31 systems in order to make a full transition from battery backup to fuel cell backup in their entire broadband network. In the material handling segment a 10 kW fuel cell system has been fully integrated in the fork lift truck, Dantruck 3000 Power Hydrogen. The result was a much more commercially mature product than expected from the beginning of the project. The result is a finished 2,5T fork lift truck which was presented at the CE-mat fair in April 2011. (LN)

  2. Safety upgrading at PAKS Nuclear Power Plant

    International Nuclear Information System (INIS)

    Bajsz, J.; Elter, J.

    2000-01-01

    The operation of Paks NPP has reached its half time. Until this time the plant fulfilled expectations raised before its construction: the four units have produced safely and reliably more than 200 TWh electricity. The production of the plant has been at the stable level since its construction and has provided 43-38 % of electricity consumed in Hungary. The annual production is around 14 TWh, which means a load factor higher than 85 %. Safety upgrading activities [1] at Paks had started in the late eighties, when the commissioning work of units 3 and 4 were carried out. That time the main emphases were put to lessons learned of the TMI and Chernobyl accidents. The international reviews hosted by our plant widened our review's scope. To systematize our approach a complete safety review, the AGNES (Advanced General Safety and New Evaluation of Safety) project was started in 1991. The goal of the project was to evaluate to what extent Paks NPP satisfied the current international safety expectations and to help in determining the priorities for safety enhancement and upgrading measures. The project completed in 1994 ranked our safety upgrading measures by safety significance, which became a basis for technical design work and financial scheduling. The other important outcome of the AGNES project was the introduction the Periodical Safety Review regime by our nuclear authority. These periodical reviews held after 10 years of operation offer the possibility - and obligation for the licensee - to perform a comprehensive assessment of the safety of the plant, to evaluate the integral effects of changes of circumstances happened during the review period. The goal of these reviews is to deal with cumulative effects of NPP ageing, modifications, operating experience and technical developments aimed at ensuring a high level of safety throughout plant service life. The execution of our safety-upgrading program is well advancing. For the whole program from 1996 to 2002 250

  3. Dipole power supply for National Synchrotron Light Source Booster upgrade

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1992-01-01

    The booster at the NSLS is being upgraded from .75 to 2 pulses per second. To accomplish this, new power supplies for the dipole, quadrupole, and sextupole magnets have been designed and are being constructed. This paper will outline the design of the dipole power supply and control system, and will present results obtained thus far

  4. Digital signal array processor for NSLS booster power supply upgrade

    International Nuclear Information System (INIS)

    Olsen, R.; Dabrowski, J.; Murray, J.

    1993-01-01

    The booster at the NSLS is being upgraded from 0.75 to 2 pulses per second. To accomplish this, new power supplied for the dipole, quadrupole, and sextupole have been installed. This paper will outline the design and function of the digital signal processor used as the primary control element in the power supply control system

  5. Experimental and computational analysis of a 1.2 kW PEMFC designed for communications backup power applications

    International Nuclear Information System (INIS)

    Krishnan, K.J.; Claveria, J.; Varadharajan, L.; Kalam, A.

    2011-01-01

    Usage of Fuel Cells due to their high power density and low greenhouse gas emissions which combine H/sub 2/ and O/sub 2/ electrochemically to produce electricity and H/sub 2/O as the by-product will become widespread in the near future due to its quality, reliability and portability. Among all types of fuel cells, Proton Exchange Membrane Fuel Cells (PEMFC) is most attractive for residential and automotive industry use due to its low operating temperature, silent operation, quick start-up characteristics and better performance. The T-1000 1.2 kW PEMFC are mainly used for communications backup power applications because of its high reliability, simplicity and ease of maintenance in telecommunication sector, utility and government etc. This paper discuses the features of T- 1000 PEMFC and also the production losses due to power outages in US and different parts of the globe and the advantages of using it in different sectors to reduce the production loses occurred by the power outages. This work focuses on the experimental data and the computational data of load, P, V, A and H/sub 2/ consumed under laboratory conditions at Power Lab in Victoria University, Melbourne. The paper also describes various load, P, V and A curves recorded at regular intervals between the experimental and computational data. The work shows notably the benefit of using T-1000 1.2 kW PEMFC for residential, automobile, government and telecom sectors. (author)

  6. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  7. Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments

    Energy Technology Data Exchange (ETDEWEB)

    Crew, James F. [Southern Company Generation, Birmingham, AL (United States). Hydro Services; Johnson, Herbie N. [Southern Company Generation, Birmingham, AL (United States). Hydro Services

    2015-03-31

    From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

  8. Nuclear power plant security systems - The need for upgrades

    International Nuclear Information System (INIS)

    Murskyj, M.P.; Furlow, C.H.

    1989-01-01

    Most perimeter security systems for nuclear power plants were designed and installed in the late 1970s or early 1980s. This paper explores the need to regularly evaluate and possibly upgrade a security system in the area of perimeter intrusion detection and surveillance. this paper discusses US Nuclear Regulatory Commission audits and regulatory effectiveness reviews (RERs), which have raised issues regarding the performance of perimeter security systems. The audits and RERs identified various degrees of vulnerability in certain aspects of existing perimeter security systems. In addition to reviewing the regulatory concerns, this paper discusses other reasons to evaluate and/or upgrade a perimeter security system

  9. The AGS main magnet power supply upgrade

    International Nuclear Information System (INIS)

    Sandberg, J.N.; Casella, R.; Geller, J.; Marneris, I.; Soukas, A.; Schumburg, N.

    1995-01-01

    The AGS Main Magnet Power Supply consists of a group of thyristor controlled power converters that operate from full rectify to full invert. In order to minimize ripple during the critical periods of injection and extraction 24 pulse converters are used for these portions of the cycle. The maximum voltage available in this mode is nominally 2,000 volts. The converters that are functional during this portion of the cycle are called the flat-top bank or ''F'' bank modules. During acceleration and invert where voltages of up to 12,000 volts are needed and where the ripple requirements are less stringent, groups of twelve pulse converters are operational. These converters are called the Pulsed bank or ''P'' bank modules. The original controlled rectifier system consisted of 96 large mercury filled excitron tubes divided equally between the P bank and F bank converters. These devices were extremely durable and ran successfully for over twenty years. It was, decided to replace the excitron farm with multiple arrangements of three-phase, full-wave, bridge modules that utilize silicon controlled rectifiers (SCR's or thyristors) as the switching element. In order to match the existing transformer connections and buswork, eight identical modules were required; four for the P bank system and four for the F bank system. In order to reduce noise pickup and provide electrical isolation the high level SCR gate triggers are provided via fiberoptic cable. The status of various parameters such as water flow, auxiliary power supply performance, trigger circuitry failure, over voltage, overcurrent, and loss of phase reference are monitored via a programmable logic controller (PLCs). The PLCs use isolated input and output modules for various voltage levels from TTL to 150 Vdc to 125 Vac. These devices are extremely flexible and have allowed modifications and improvements that have enhanced the performance over any equivalent hard wired system

  10. Greenhouse gas emissions from operating reserves used to backup large-scale wind power.

    Science.gov (United States)

    Fripp, Matthias

    2011-11-01

    Wind farms provide electricity with no direct emissions. However, their output cannot be forecasted perfectly, even a short time ahead. Consequently, power systems with large amounts of wind power may need to keep extra fossil-fired generators turned on and ready to provide power if wind farm output drops unexpectedly. In this work, I introduce a new model for estimating the uncertainty in short-term wind power forecasts, and how this uncertainty varies as wind power is aggregated over larger regions. I then use this model to estimate the reserve requirements in order to compensate for wind forecast errors to a 99.999% level of reliability, and an upper limit on the amount of carbon dioxide that would be emitted if natural gas power plants are used for this purpose. I find that for regions larger than 500 km across, operating reserves will undo 6% or less of the greenhouse gas emission savings that would otherwise be expected from wind power.

  11. 76 FR 23795 - Low-Power Television and Translator Upgrade Program: Notice of Final Closing Date

    Science.gov (United States)

    2011-04-28

    .... 110418247-1247-01] Low-Power Television and Translator Upgrade Program: Notice of Final Closing Date AGENCY... receipt of applications for the Low-Power Television and Translator Upgrade Program (Upgrade Program) will... Rules to Establish Rules for Digital Low Power Television, Television Translator, and Television Booster...

  12. UPGRADES

    CERN Multimedia

    J. Butler and J. Nash

    2011-01-01

    Recent progress on the CMS upgrades was summarised, in a workshop held at Fermilab between 7th and 10th November, attended by more than 150 people, many of whom came from Europe and Asia. Important goals of the workshop were to begin to formulate a schedule for the upgrades and to determine project interdependencies. Input was received from all the upgrade working groups and will be combined into a first-pass schedule over the next several weeks. In addition, technical progress on each of the major subtasks was presented and plans for the near-term future were established. Slides from the more than 100 talks are located at: https://indico.cern.ch/conferenceDisplay.py?confId=153564 In the opening plenary session, Frank Zimmermann, of the CERN Beams Department, gave his view of the LHC luminosity evolution. The luminosity will increase faster than we assumed in designing the upgrades. CMS will need to re-evaluate the current upgrade plans and revise them if necessary. CMS Upgrade Physics coordinator...

  13. Investigation of solar parabolic trough power plants with and without integrated TES (thermal energy storage) and FBS (fuel backup system) using thermic oil and solar salt

    International Nuclear Information System (INIS)

    Boukelia, T.E.; Mecibah, M.S.; Kumar, B.N.; Reddy, K.S.

    2015-01-01

    Thermodynamic, economic and environmental analyses of concentrating solar power plants assist in identifying an effective and viable configuration. In this paper, a 4E (energy-exergy-environmental-economic) comparative study of 8 different configurations of parabolic trough solar thermal power plants with two different working fluids (Therminol VP-1 -oil and molten solar salt), with and without integrated thermal energy storage or/and backup fuel system is presented. The results of the comparative study indicate relevant differences among the 8 configurations. The molten solar salt configuration with integrated thermal energy storage and fossil fuel backup system exhibits the highest overall energy efficiency (18.48%) compared to other configurations. Whereas, the highest overall exergy efficiency (21.77%), capacity factor (38.20%) and annual energy generation (114 GWh) are found for the oil based configuration with integrated thermal energy storage and fossil fuel backup system. The results indicate that the configurations based on molten salt are better in terms of environmental and economical parameters. The configurations with integrated thermal energy storage and fossil fuel backup system are found to be techno-economical, but on the other hand are less environment friendly. A detailed comparison of these plants after optimization must be performed before drawing a final conclusion about the best configuration to be adopted in parabolic trough solar thermal power plant. - Highlights: • 4E comparative study of 8 configurations of PTSTPP with two different fluids. • Comparison of the configurations with and without integrated TES (thermal energy storage) and FBS (fuel backup system). • The overall energy efficiency of the salt plant with TES and FBS is the highest. • The overall exergy efficiency of the oil plant with TES and FBS is the highest. • The salt plants are the best configurations in terms of environ–eco parameters

  14. I and C upgrading at nuclear power plants

    International Nuclear Information System (INIS)

    Tamiri, A.

    2003-01-01

    Continuing the operation of existing nuclear power plants will help reduce the number of new base-load nuclear and fossil power plants that need to be built. Old nuclear power plants in Canada are operating with analog instrumentation and control systems. For a number of reasons, such as changes and improvements in the applicable standards and design, maintenance problems due to the lack of spares, technical obsolescence, the need to increase power production, availability, reliability and safety, and in order to reduce operation and maintenance costs, instrumentation and control upgrading at nuclear power plants in a cost effective manner should be considered the greatest priority. Failures of instrumentation and control (I and C) due to aging and obsolescence issues may have an immediate negative impact on plant reliability and availability and also affect long-term plant performance and safety. In today's competitive marketplace, power plants are under pressure to cut spending on maintenance while reducing the risk of equipment failure that could cause unplanned outage. To improve plant safety and availability, old nuclear power plants will require investment in new technologies that can improve the performance and reduce the costs of generation by addressing the long term reliability of systems by up-grading to modem digital instrumentation and control and optimization opportunities. Boiler drum level control at nuclear power plants is critical for both plant protection and equipment safety and applies equality to high and low levels of water within the boiler drum. Plant outage studies at Pickering Nuclear have identified boiler drum level control and feed water control systems as major contributors to plant unavailability. Ways to improve transient and steady state response, upgrading existing poor analog control systems for boiler level and feed-water control systems at Pickering Nuclear, with enhanced and robust controller will be discussed in this paper

  15. Making the grid the backup: Utility applications for fuel cell power

    Energy Technology Data Exchange (ETDEWEB)

    Eklof, S.L. [Sacramento Municipal Utility District (SMUD), Sacramento, CA (United States)

    1996-12-31

    Fuel cells are recognized as a versatile power generation option and accepted component of SMUD`s ART Program. SMUD has received wide support and recognition for promoting and implementing fuel cell power plants, as well as other innovative generation, based primarily on technological factors. Current economic and technical realities in the electric generation market highlight other important factors, such as the cost involved to develop a slate of such resources. The goal now is to develop only those select quality resources most likely to become commercially viable in the near future. The challenge becomes the identification of candidate technologies with the greatest potential, and then matching the technologies with the applications that will help to make them successful. Utility participation in this development is critical so as to provide the industry with case examples of advanced technologies that can be applied in a way beneficial to both the utility and its customers. The ART resource acquisitions provide the experience base upon which to guide this selection process, and should bring about the cost reductions and reliability improvements sought.

  16. Comparison of circular orbit and Fourier power series ephemeris representations for backup use by the upper atmosphere research satellite onboard computer

    Science.gov (United States)

    Kast, J. R.

    1988-01-01

    The Upper Atmosphere Research Satellite (UARS) is a three-axis stabilized Earth-pointing spacecraft in a low-Earth orbit. The UARS onboard computer (OBC) uses a Fourier Power Series (FPS) ephemeris representation that includes 42 position and 42 velocity coefficients per axis, with position residuals at 10-minute intervals. New coefficients and 32 hours of residuals are uploaded daily. This study evaluated two backup methods that permit the OBC to compute an approximate spacecraft ephemeris in the event that new ephemeris data cannot be uplinked for several days: (1) extending the use of the FPS coefficients previously uplinked, and (2) switching to a simple circular orbit approximation designed and tested (but not implemented) for LANDSAT-D. The FPS method provides greater accuracy during the backup period and does not require additional ground operational procedures for generating and uplinking an additional ephemeris table. The tradeoff is that the high accuracy of the FPS will be degraded slightly by adopting the longer fit period necessary to obtain backup accuracy for an extended period of time. The results for UARS show that extended use of the FPS is superior to the circular orbit approximation for short-term ephemeris backup.

  17. Upgrading of seismic design of nuclear power plant building

    Energy Technology Data Exchange (ETDEWEB)

    Akiyama, Hiroshi [Tokyo Univ. (Japan). Faculty of Engineering; Kitada, Yoshio

    1997-03-01

    In Japan seismic design methodology of nuclear power plant (NPP) structures has been established as introduced in the previous session. And yet efforts have been continued to date to upgrade the methodology, because of conservative nature given to the methodology in regard to unknown phenomena and technically-limited modeling involved in design analyses. The conservative nature tends to produce excessive safety margins, and inevitably send NPP construction cost up. Moreover, excessive seismic design can increase the burden on normal plant operation, though not necessarily contributing to overall plant safety. Therefore, seismic engineering has put to many tests and simulation analyses in hopes to rationalize seismic design and enhance reliability of seismic safety of NPPs. In this paper, we describe some studies on structural seismic design of NPP underway as part of Japan`s effort to upgrade existing seismic design methodology. Most studies described here are carried out by NUPEC (Nuclear Power Engineering Company) funded by MITI (the Ministry of International Trade and Industry Japan), though, similar studies with the same motive are also carrying out by nuclear industries such as utilities, NPP equipment and system manufacturers and building constructors. This paper consists of three sections, each introducing studies relating to NPP structural seismic design, new siting technology, and upgrading of the methodology of structural design analyses. (J.P.N.)

  18. Upgrading of seismic design of nuclear power plant building

    International Nuclear Information System (INIS)

    Akiyama, Hiroshi; Kitada, Yoshio.

    1997-01-01

    In Japan seismic design methodology of nuclear power plant (NPP) structures has been established as introduced in the previous session. And yet efforts have been continued to date to upgrade the methodology, because of conservative nature given to the methodology in regard to unknown phenomena and technically-limited modeling involved in design analyses. The conservative nature tends to produce excessive safety margins, and inevitably send NPP construction cost up. Moreover, excessive seismic design can increase the burden on normal plant operation, though not necessarily contributing to overall plant safety. Therefore, seismic engineering has put to many tests and simulation analyses in hopes to rationalize seismic design and enhance reliability of seismic safety of NPPs. In this paper, we describe some studies on structural seismic design of NPP underway as part of Japan's effort to upgrade existing seismic design methodology. Most studies described here are carried out by NUPEC (Nuclear Power Engineering Company) funded by MITI (the Ministry of International Trade and Industry Japan), though, similar studies with the same motive are also carrying out by nuclear industries such as utilities, NPP equipment and system manufacturers and building constructors. This paper consists of three sections, each introducing studies relating to NPP structural seismic design, new siting technology, and upgrading of the methodology of structural design analyses. (J.P.N.)

  19. UPGRADES

    CERN Document Server

    D. Contardo and J. Spalding

    2013-01-01

    There is very good progress in the execution of the LS1 projects and in launching construction of the Phase 1 upgrades. We focus here on two main achievements since the last CMS Week. The approval of the third Phase 1 TDR The preparation of the L1 Trigger Upgrade Technical Design Report has been a major effort of the collaboration at the beginning of this year, especially to develop supporting Trigger menu and physics performance studies. These studies have demonstrated the efficiency of the upgraded system to ensure low lepton and jet trigger thresholds, leading to a significant increase of the acceptance for the Higgs measurements, in the associated production mode and in the ττ decays, as well as for the stop searches involving multiple jets in the final state. The TDR was submitted to the LHCC in May and approved at the June committee meeting. It is now a public document, completing the series of the three TDRs describing the Phase 1 upgrades, with the new Pixel system and the HCAL rea...

  20. A COMPUTATIONAL FLUID DYNAMICS ANALYSIS OF AIR FLOW THROUGH A TELECOM BACK-UP UNIT POWERED BY AN AIR-COOLED PROTON EXCHANGE MEMBRANE FUEL CELL

    DEFF Research Database (Denmark)

    Gao, Xin; Berning, Torsten; Kær, Søren Knudsen

    2016-01-01

    Proton exchange membrane fuel cells (PEMFC’s) are currently being commercialized for various applications ranging from automotive to stationary such as powering telecom back-up units. In PEMFC’s, oxygen from air is internally combined with hydrogen to form water and produce electricity and heat....... This product heat has to be effectively removed from the fuel cell, and while automotive fuel cells are usually liquid-cooled using a secondary coolant loop similar to the internal combustion engines, stationary fuel cell systems as they are used for telecom back-up applications often rely on excessive air fed...... to the fuel cell cathode to remove the heat. Thereby, the fuel cell system is much simpler and cheaper while the fuel cell performance is substantially lower compared to automotive fuel cells. This work presents a computational fluid dynamics analysis on the heat management of an air-cooled fuel cell powered...

  1. Modernization and power upgrading of the Loviisa NPP

    International Nuclear Information System (INIS)

    Keskinen, A.

    1997-01-01

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.)

  2. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A. [IVO Power Engineering Ltd., Vantaa (Finland)

    1997-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  3. Modernization and power upgrading of the Loviisa NPP

    Energy Technology Data Exchange (ETDEWEB)

    Keskinen, A [IVO Power Engineering Ltd., Vantaa (Finland)

    1998-12-31

    In 1995, Imatran Voima Oy (IVO) started a project for modernization and power upgrading of the Loviisa NPP. The main objectives of the project are to ensure plant safety, to increase electricity production and to improve the expertise of the IVO staff. The total electricity output of Loviisa 1 and 2 units is planned to be increased by about 100 MW. This will be achieved through renovation of the steam turbines and through gradual increase in the thermal reactor power up to 1,500 MW from the present level of 1,375 MW. The Loviisa NPP Final Safety Analysis Report has been revised to a great extent in connection with the licensing process of the reactor power upgrading. The project also includes certain improvements in the primary and safety systems to ensure plant safety. The total cost estimate of the project is around 200 million FIM. The project implementation started in 1995 and in accordance with the plans in 2000 after several phases the last measures at power plant will be completed. (orig.). 4 refs.

  4. Upgrading the safety assessment of exported nuclear power plants

    International Nuclear Information System (INIS)

    Rosen, M.

    1978-01-01

    An examination of the safety aspects of exported nuclear power plants demonstrates that additional and somewhat special considerations exist for these plants, and thus that some new approaches may be required to insure their safety. In view of the generally small regulatory staffs of importing countries, suggestions are given for measures which should be taken by the various organizations involved in the export and import of nuclear power facilities to raise the level of the very essential safety assessment. These include the upgrading of the 'export edition' of the traditionally supplied safety documentation by use of a Supplementary Information Report, written specifically for the needs of a smaller and/or less technically qualified staff, which highlights the differences that exist between the facility to be constructed and the supposedly similar reference plant of the supplier country; by improvement of supporting safety documentation to allow for adequate understanding of significant safety parameters; and by attention to the needs of smaller countries in the critical Operating Regulations (Technical Specifications for Operation). Consideration is also given to upgrading the regulatory effort and to the obligations of principal organizations involved with exported nuclear plants, including national and international, for insuring the importing countries' technical readiness and the adequacy of the regulatory effort. Special attention is directed towards the project contract as a means of implementing programmes to achieve these goals. (author)

  5. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2012-01-01

      Good progress is being made on the projects that will be installed during LS1. CSC chamber production for ME4/2 is progressing at a rate of four chambers per month, with 25 built so far, and the new electronics for ME1/1 is undergoing a pre-production integration testing. For the RPC chambers, gap production is underway with first deliveries to the chamber assembly sites at CERN and Ghent. The third site at Mumbai will begin production next month. For the PMT replacement in the forward hadron calorimeters (HF), the 1728 PMTs are all characterised and ready to be installed. Testing of the electronics boards is going well. Preparations to replace the HPDs in the outer calorimeter (HO) with SiPMs are also on-track. All components are at CERN and burn-in of the new front-end electronics is proceeding. There are three major upgrade projects targeting the period from LS1 through LS2: a new pixel detector, upgraded photo-detectors and electronics for HCAL, and development of a new L1 Trigger. The new ...

  6. UPGRADES

    CERN Multimedia

    Didier Contardo

    2012-01-01

      The CMS Upgrade Programme is making good progress on the LS1 and Phase 1 projects, in the planning for Phase 2. The construction of the ME4/2 muon chambers to be installed during LS1 has started and the two first CSC production chambers have been fully qualified. The three muon groups have recently established a set of milestones towards the completion of their project, that will be integrated in the detailed planning and scheduling for the shutdown work established by Technical Coordination. The project to replace the photo-detectors in the HF and HO calorimeters is also well advanced and at the validation stage. The operation of an HF slice with new multi-anode PMTs and back-end electronics has already been demonstrated in 2012. For the Phase 1 data-taking, as discussed in the Chamonix workshop, it is likely that the LHC performance will exceed the nominal luminosity and pile-up before the second shutdown, still scheduled in 2018. The collaboration is therefore pursuing a strategy to upgrade ...

  7. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    The three post-LS1 Phase 1 Upgrade projects (the L1-Trigger, Pixel Tracker, and HCAL) are all making excellent progress and are transitioning from the prototype to the execution phase. Meanwhile plans are developing for Phase 2, a major Upgrade programme targeting the third long shutdown, LS3. News on Phase 1 is included under the respective projects; we only provide a brief summary here. Phase 1 The plan for the L1 Trigger relies on the installation during the present shutdown of optical splitting for the Trigger input signals. This will allow the new Trigger system to be brought online and fully commissioned during beam operation in 2015, while CMS relies on the existing legacy Trigger for physics. Once fully commissioned the experiment can switch over to the new Trigger, which will provide greatly improved performance at high event pile-up, by 2016. System tests of the splitter system, and of the new architecture of the calorimeter trigger were very successful, and the work in LS1 is on-track. Prototype ...

  8. Cost evaluation of I and C upgrade approach in nuclear power plants

    International Nuclear Information System (INIS)

    Kang, Hyun-Tae; Lee, Jae-Ki

    2013-01-01

    Highlights: • Cost evaluation process for I and C system upgrade is built. • 4 cost factors affecting I and C system upgrade are described. • Additional cost incurred by a phased upgrade is calculated. • Cost for system upgrade between upgrade implementations is compared. - Abstract: Utilities have recently been debating the respective pros and cons of implementation of a multi-phase upgrade during several normal outages versus a single major upgrade implementation during a prolonged outage. We have studied these approaches and have been developing the basic design of nuclear power plants (NPPs) instrumentation and control (I and C) upgrade since early 2008. As part of this study, analyses of the NPPs I and C systems were conducted and the need for upgrading the systems was raised. One of the primary concerns regarding the system upgrade is a cost-benefit implementation, which will influence the upgrade approach. From this viewpoint, the I and C upgrade must consider economic factors such as I and C vendor cost, architecture engineering cost, installation cost, utility cost, and other transition costs such as training and procedure development. This paper presents a comparison study of economical aspects including cost evaluation between the aforementioned upgrade implementations and suggests a solution for I and C upgrade approach

  9. Power inverter design for ASDEX Upgrade saddle coils

    Energy Technology Data Exchange (ETDEWEB)

    Teschke, M., E-mail: teschke@ipp.mpg.de [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Suttrop, W.; Rott, M. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

    2013-10-15

    Highlights: ► A cost effective inverter topology for AUG's 16 in-vessel saddle coils has been found. ► Use of commercially available power modules is possible. ► Exchange of reactive power between multiple inverters is possible. ► Influence of electromagnetic noise to AUG's diagnostics was measured. ► Gas insulation of electric feed through significantly depends on magnetic fields. It is protected by fast turn-off circuit. -- Abstract: A set of 16 in-vessel saddle coils has been installed in the ASDEX Upgrade (AUG) experiment since the end of 2011 [1]. To achieve full performance, it is necessary to operate them with alternating current (AC) of arbitrary waveforms. To generate spatially resolved magnetic fields, it is required to allocate separate power inverters to every single coil. Therefore, different topologies are analyzed and compared. Studies of the commutation behavior of power stages, different pulse width modulation (PWM) schemes and single-phase-to-earth fault detection are executed. Experiments to evaluate the electromagnetic interference (EMI) of possible inverter topologies on the AUG diagnostics are done as well. A special focus is put on the feasibility of analyzed topologies using industrially available and fully assembled “power modules” to minimize development effort and costs.

  10. Upgrading and efficiency improvement in coal-fired power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-08-01

    Improving the efficiencies of the large number of older coal-fired power plants operating around the world would give major savings in CO2 emissions together with significant other benefits. This report begins with a summary of the ways efficiency can become degraded and of the means available to combat the decrease in performance. These include improvements to operating and maintenance practices and more major techniques that are available, including boiler and turbine retrofits. There is also an update on fuel drying developments as a route to higher efficiency in plants firing high moisture lignites. The largest chapter of the report contains a number of descriptions of case study improvement projects, to illustrate measures that have been applied, benefits that have been achieved and identify best practices, which are summarised. Major national and international upgrading programmes are described.

  11. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  12. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

      LS1 and Phase 1 The detector projects targeting LS1 are progressing well, and a fully integrated schedule developed by Technical Coordination includes installation milestones and a detailed work-plan. The first chambers of the RPC system were produced and are being qualified. Production will ramp up this year to a rate of 20 chambers per month. 32 chambers of the CSC system have been fabricated for the ME4/2 CSC stations, and production proceeds at a rate of 4 per month. The new ME1/1 Front-End Board is in production and the off-detector electronics integration tests are ongoing. The new Theta Trigger Boards for the DT readout production is started and the relocation of the Sector Collector boards with new Optical Links as been successfully tested. All the components for the upgrade of the Forward Hadron Calorimeter PMTs have been received at CERN and assemblies are being qualified. The situation is similar for the Hadron Outer Calorimeter new SiPMs and readout modules. Three projects are plan...

  13. Marketing CE approved off-the-shelf FC-operated power backup units for the telecom industry at competitive prices : a continuing success story

    Energy Technology Data Exchange (ETDEWEB)

    Mortensen, P. [Dantherm Power, Skive (Denmark)

    2009-07-01

    Dantherm Power receives a steady supply of fuel cell stacks packed on pallets at its factory in Denmark. Once unpacked, they go to an assembly line to be integrated into power modules designed for telecom- and IT network-base-stations around the world. The CE approved units are designed and tested to meet current telecom standards. Customers can purchase the off-the-shelf units at competitive prices. Dantherm Power has brought fuel-cell technology beyond the research and development stage. Since 2005, the company has sold backup units providing uninterruptible power supply (UPS) to the telecom industry on standard commercial terms. Their fuel cell-based-solutions have proven to be successful. The company began in 2003 as a research and development project within Dantherm Air Handling A/S. Development was driven by the idea that a UPS-system based on hydrogen and fuel-cell-technology may be better solution than traditional battery and diesel driven backup for many of the company's existing clients.

  14. A Total Cost of Ownership Model for Low Temperature PEM Fuel Cells in Combined Heat and Power and Backup Power Applications

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Berkeley; Wei, Max; Lipman, Timothy; Mayyas, Ahmad; Chien, Joshua; Chan, Shuk Han; Gosselin, David; Breunig, Hanna; Stadler, Michael; McKone, Thomas; Beattie, Paul; Chong, Patricia; Colella, Whitney; James, Brian

    2014-06-23

    A total cost of ownership model is described for low temperature proton exchange membrane stationary fuel cell systems for combined heat and power (CHP) applications from 1-250kW and backup power applications from 1-50kW. System designs and functional specifications for these two applications were developed across the range of system power levels. Bottom-up cost estimates were made for balance of plant costs, and detailed direct cost estimates for key fuel cell stack components were derived using design-for-manufacturing-and-assembly techniques. The development of high throughput, automated processes achieving high yield are projected to reduce the cost for fuel cell stacks to the $300/kW level at an annual production volume of 100 MW. Several promising combinations of building types and geographical location in the U.S. were identified for installation of fuel cell CHP systems based on the LBNL modelling tool DER CAM. Life-cycle modelling and externality assessment were done for hotels and hospitals. Reduced electricity demand charges, heating credits and carbon credits can reduce the effective cost of electricity ($/kWhe) by 26-44percent in locations such as Minneapolis, where high carbon intensity electricity from the grid is displaces by a fuel cell system operating on reformate fuel. This project extends the scope of existing cost studies to include externalities and ancillary financial benefits and thus provides a more comprehensive picture of fuel cell system benefits, consistent with a policy and incentive environment that increasingly values these ancillary benefits. The project provides a critical, new modelling capacity and should aid a broad range of policy makers in assessing the integrated costs and benefits of fuel cell systems versus other distributed generation technologies.

  15. Upgrading the power supplies of TEXTOR for three Tesla operation

    International Nuclear Information System (INIS)

    Giesen, B.; Veiders, E.; Petree, F.; Fink, R.; Wagnitz, R.

    1986-01-01

    The toroidal magnetic system of TEXTOR can tolerate a magnetic field load of up to 2.6 Tesla routinely at full plasma current, and of up to 3 Tesla under certain boundary conditions and for a restricted number of discharges. The original power supply which can generate a toroidal magnetic field of 2 Tesla has been upgraded to operate at a field strength of 3 Tesla, by adding a new, controlled rectifier, with its own independent control, connected in parallel with the first. Studies were undertaken to determine its behaviour where control is lost, such as when a circuit breaker trips or in ''freewheel'' operation. This paper analyzes this asymmetrical arrangement and discusses the danger of damaging the smaller unit by commutating a large current into it. Moreover, in order to improve the availability of TEXTOR, the new controlled rectifier is redundant to two other units that control the vertical field and the ohmic heating coil currents. For this purpose the two bridges of this 12-pulse system are to be changed from a parallel to a series connexion, the free-wheeling diodes are disconnected and redeployed to block the large voltage pulses that are induced at plasma initiation, and 3-phase ''freewheeling'' thyristors are added that serve to reduce reactive power consumption

  16. Upgrading of fire safety in Indian nuclear power plants

    International Nuclear Information System (INIS)

    Agarwal, N.K.

    1998-01-01

    Indian nuclear power programme started with the installation of 2 nos. of Boiling Water Reactor (BWR) at Tarapur (TAPS I and II) of 210 MWe each commissioned in the year 1996. The Pressurized Heavy Water Reactor (PHWR) programme in the country started with the installation of 2x220 MWe stations at Rawatbhatta near Kota (RAPS I and II) in the State of Rajasthan in the sixties. At the present moment, the country has 10 stations in operation. Construction is going on for 4 more units of 220 MWe where as work on two more 500 MWe units is going to start soon. Fire safety systems for the earlier units were engineered as per the state-of-art knowledge available then. The need for review of fire protection systems in the Indian nuclear power plants has also been felt since long almost after Brown's Ferry fire in 1975 itself. Task forces consisting of fire experts, systems design engineers, O and M personnel as well as the Fire Protection engineers at the plant were constituted for each plant to review the existing fire safety provisions in details and highlight the upgradation needed for meeting the latest requirements as per the national as well as international practices. The recommendations made by three such task forces for the three plants are proposed to be reviewed in this paper. The paper also highlights the recommendations to be implemented immediately as well as on long-term basis over a period of time

  17. Upgrading instrumentation and control in nuclear power plants. Design criteria

    International Nuclear Information System (INIS)

    Rodriguez Rodriguez, M.C.; Alvarez Menendez, A.

    1997-01-01

    The use of programmed digital technology in Protection, Control, Monitoring and Information Systems in new generation nuclear power plants, or the use of this technology to replace or upgrade existing systems based on wired analog instrumentation and electromechanical relays, has led to new international standards which establish new design requirements or adapt existing requirements to this technology. Additionally, both regulatory organisations and the industry are discussing the reliability of this technology, regarding common mode failures that may occur in redundant protection channels, due to the use of equipment and software with the same characteristics. The first part of this paper addresses the most important aspects of new international standards regarding classification criteria for I and C systems, equipment and functions, depending on their importance to safety and the design criteria applicable to each category. Special attention is drawn to requirements concerning software quality assurance and the design of new control rooms. The paper then goes on to discuss the different technical solutions being implemented, using equipment and software diversification, in order to prevent the possibility of common mode failures affecting the protection function. (Author)

  18. Seismic assessment and upgrading of Paks nuclear power plant

    International Nuclear Information System (INIS)

    Tamas, K.

    2001-01-01

    A comprehensive programme for seismic assessment and upgrading is currently in progress at Hungary's Paks NPP. The re-evaluation of the site seismic hazard had been already completed. The technology of safe shut down and heat removal is established and the systems and structures relevant for seismic safety are identified. A seismic instrumentation is installed. The pre-earthquake preparedness and post-earthquake actions are elaborated. The methods for seismic capacity assessment are selected. The seismic capacity evaluation and the design of upgrading measures are currently in progress. The easy to perform upgrading covering the most urgent measures had been already performed. (author)

  19. Modernisation of hydrogenerators. Upgrading of power plants for more efficiency; Modernisierung von Hydrogeneratoren. Kraftwerks-Upgrade fuer mehr Effizienz

    Energy Technology Data Exchange (ETDEWEB)

    Allen, John

    2012-07-01

    Ever since the construction of the first alternating current hydroelectric power plant with a performance of 12.5 kW in the year 1882, the number and performance of hydroelectric power plants had increased substantially. For example, the hydroelectric power plant at the Three Gorges Dam in the People's Republic of China has a total performance of 22,500 MW. The isolation systems of the hydrogenerators have a limited lifetime and have to be exchanged after fifty years usually. Under this aspect, the authors of the contribution under consideration reports on the upgrading of hydrogenerators for more efficiency.

  20. Superconducting Magnet Power Supply and Hard-Wired Quench Protection at Jefferson Lab for 12 GeV Upgrade

    International Nuclear Information System (INIS)

    Ghoshal, Probir K.; Bachimanchi, Ramakrishna; Fair, Ruben J.; Gelhaar, David; Kumar, Onish

    2017-01-01

    The superconducting magnet system in Hall B being designed and built as part of the Jefferson Lab 12 GeV upgrade requires powering two conduction cooled superconducting magnets - a torus and a solenoid. The torus magnet is designed to operate at 3770 A and solenoid at 2416 A. Failure Modes and Effects Analysis (FMEA) determined that voltage level thresholds and dump switch operation for magnet protection should be tested and analyzed before incorporation into the system. The designs of the quench protection and voltage tap sub-systems were driven by the requirement to use a primary hard-wired quench detection sub-system together with a secondary PLC-based protection. Parallel path voltage taps feed both the primary and secondary quench protection sub-systems. The PLC based secondary protection is deployed as a backup for the hard-wired quench detection sub-system and also acts directly on the dump switch. Here, we describe a series of tests and modifications carried out on the magnet power supply and quench protection system to ensure that the superconducting magnet is protected for all fault scenarios.

  1. Backup to the Future

    DEFF Research Database (Denmark)

    Rasmus, Handberg; Conrad, Anders S.; Svendsen, Michael

    2017-01-01

    What if something horrible happens in the future? Great Scott! Do we have a backup? Is a backup even enough? At the Kepler Asteroseismic Science Operations Center (KASOC) we have a goal that all data and information from Kepler and KASC is preserved for the future. The benchmark is that the data ...... should be useful for, at least, the next 50 years. But how do we ensure that hundreds of terabytes of data are understandable or even readable in half a century?...

  2. Questions to the reactors power upgrade of the Nuclear Power Plant of Laguna Verde

    International Nuclear Information System (INIS)

    Salas M, B.

    2014-08-01

    The two reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) were subjected to power upgrade labors with the purpose of achieving 20% upgrade on the original power; these labors concluded in August 24, 2010 for the Reactor 1 and in January 16, 2011 for the Reactor 2, however in January of 2014, the NNP-L V has not received by part of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) the new Operation License to be able to work with the new power, because it does not fulfill all the necessary requirements of safety. In this work is presented and analyzed the information obtained in this respect, with data provided by the Instituto Federal de Acceso a la Informacion Publica y Proteccion de Datos (IFAI) and the Comision Federal de Electricidad (CFE) in Mexico, as well as the opinion of some workers of the NPP-L V. The Governing Board of the CFE announcement that will give special continuation to the behavior on the operation and reliability of the NPP-L V, because the frequency of not announced interruptions was increased 7 times more in the last three years. (Author)

  3. Backup in Windows 8

    CERN Document Server

    Steps, Studio Visual

    2014-01-01

    Creating backups (or safety copies) of files has become increasingly important for many computer users. A growing number of people save important and vital information on their computer. Often this will be business, tax or financial information, but it also can include photos and videos. Nowadays, lots of fond memories and unforgettable moments are recorded onto digital media with photo and video cameras. A few years ago backups were usually created on storage media such as floppy disks, CDs, or DVDs. These types of storage media had one major disadvantage, in that you could only store a s

  4. Backup in Windows 7

    CERN Document Server

    2014-01-01

    Creating backups (or safety copies) of files has become increasingly important for many computer users. A growing number of people save important and vital information on their computer. Often this will be business, tax or financial information, but it also can include photos and videos. Nowadays, lots of fond memories and unforgettable moments are recorded onto digital media with photo and video cameras. A few years ago backups were usually created on storage media such as floppy disks, CDs, or DVDs. These types of storage media had one major disadvantage, in that you could only store a s

  5. Upgrading safety documentation for exported nuclear power plants

    International Nuclear Information System (INIS)

    Rosen, M.

    1978-01-01

    In view of the generally small regulatory staffs of importing countries, suggestions are given for upgrading the ''export edition'' of the traditionally supplied safety documentation by use of a Supplementary Information Report, written specifically for the needs of a smaller and/or less technically qualified staff, which would highlight the differences that exist between the facility to be constructed and the supposedly similar reference plant of the supplier country; by improvement of supporting safety documentation to allow for adequate understanding of significant safety parameters; and by attention to the needs of smaller countries in the critical operating regulations (Technical Specifications for Operation). (author)

  6. 2010 Manufacturing Readiness Assessment Update to the 2008 Report for Fuel Cell Stacks and Systems for the Backup Power and Materials Handling Equipment Markets

    Energy Technology Data Exchange (ETDEWEB)

    Wheeler, D.; Ulsh, M.

    2012-08-01

    In 2008, the National Renewable Energy Laboratory (NREL), under contract to the US Department of Energy (DOE), conducted a manufacturing readiness assessment (MRA) of fuel cell systems and fuel cell stacks for back-up power and material handling applications (MHE). To facilitate the MRA, manufacturing readiness levels (MRL) were defined that were based on the Technology Readiness Levels previously established by the US Department of Energy (DOE). NREL assessed the extensive existing hierarchy of MRLs developed by Department of Defense (DoD) and other Federal entities, and developed a MRL scale adapted to the needs of the Fuel Cell Technologies Program (FCTP) and to the status of the fuel cell industry. The MRL ranking of a fuel cell manufacturing facility increases as the manufacturing capability transitions from laboratory prototype development through Low Rate Initial Production to Full Rate Production. DOE can use MRLs to address the economic and institutional risks associated with a ramp-up in polymer electrolyte membrane (PEM) fuel cell production. In 2010, NREL updated this assessment, including additional manufacturers, an assessment of market developments since the original report, and a comparison of MRLs between 2008 and 2010.

  7. Upgrading of fire safety in nuclear power plants. Proceedings of an International Symposium

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The document includes 40 papers presented at the International Symposium on Upgrading of Fire Safety in Nuclear Power Plants held in Vienna between 18-21 November 1997. The symposium presentations were grouped in 6 sessions: Fire safety reviews (5 papers), Fire safety analysis - Methodology (6 papers), Fire safety analysis - Applications (3 papers), Panel 1 - Identification of deficiencies in fire safety in nuclear power plants - Operational experience and data (7 papers), Panel 2 - Experience based data in fire safety assessment - Fire safety regulations and licensing (7 papers), Upgrading programmes (10 papers), and a closing session (2 papers). A separate abstract was prepared for each paper Refs, figs, tabs

  8. Upgrading of fire safety in nuclear power plants. Proceedings of an International Symposium

    International Nuclear Information System (INIS)

    1998-04-01

    The document includes 40 papers presented at the International Symposium on Upgrading of Fire Safety in Nuclear Power Plants held in Vienna between 18-21 November 1997. The symposium presentations were grouped in 6 sessions: Fire safety reviews (5 papers), Fire safety analysis - Methodology (6 papers), Fire safety analysis - Applications (3 papers), Panel 1 - Identification of deficiencies in fire safety in nuclear power plants - Operational experience and data (7 papers), Panel 2 - Experience based data in fire safety assessment - Fire safety regulations and licensing (7 papers), Upgrading programmes (10 papers), and a closing session (2 papers). A separate abstract was prepared for each paper

  9. The Role of Nuclear Power in Slovak Republic; Safety Upgrading Program for WWER Reactors

    International Nuclear Information System (INIS)

    Toth, A.

    1998-01-01

    Implementation of Slovenske elektrarne Production Base Development Program, where all these safety upgrading projects of nuclear power sources at Slovak Republic are included will ensure first of all safety of nuclear power sources on internationally acceptable level, operational reliability of nuclear power units, balanced consumption and production of electric energy in Slovakia and decrease of long term ecological impact in according with international commitments of Slovakia

  10. DanDan. Final report. [PEM fuel cells for back-up power and UPS]; DanDan. Slutrapport

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-08-15

    The project has provided valuable results for the partners involved, and has resulted in the construction and demonstration of a modular UPS system that can be used with fuel cells. Dantherm Power has provided a 5 kW fuel cell module, based on LT-pem technology, for use in the demonstration and testing facility. The function of the unit is verified by both internal testing and demonstrations from at third parties were it currently is set up to perform tests regarding lifetime. The development of a DC / DC converter, was made. The module has been tested under various conditions, and the development process has resulted in detailed specs of both technique and test process. The module has been tested both in laboratory environment and demonstrated at third parties. The module is part of the systems described in connection with initial test runs - performed at strategic partners - and in connection with the demonstration of the systems both in Japan and in South Africa. The modules are presently in a stage of demonstration, while subjected to substantial service life tests. The purchased reformers are part of the systems used for demonstration in the project and as such they will supply valuable data trough the comprehensive test and verification program initiated. (LN)

  11. The upgraded PSI application in the BEPCⅡ power supply control system

    International Nuclear Information System (INIS)

    Li Jiangqi; Wang Xiaoli; Wang Chunhong; Liu Jia

    2011-01-01

    There are about 460 magnet power supplies in the two rings and the transport lines of the BEPCⅡ which are controlled by the power supply controller and the power supply interface. An upgraded Power Supply Interface (PSI-Ⅱ) was developed for replacing the old one in the power supply control system of the BEPCⅡ. It will firstly describe feature of the PSI-Ⅱ and difference from the PSI. Then, discuss performance test of the PSI-Ⅱ well as its application in the power supply control system. (authors)

  12. Upgrading the standard makeup node at the Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Charvat, L.; Dvorak, J.

    1999-01-01

    Modifications made on the normal makeup and boron control system of the Dukovany nuclear power plant in 1997 and 1998 are described. The reasons for and objectives of the upgrading are highlighted in relation to the reliability of the facility and maintenance cost of the system. (author)

  13. Upgrading of electrostatic precipitators in old thermal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Gurumurthy, H V

    1987-02-01

    Indian thermal power stations installed in the 60's and earlier had dust collectors whose efficiency was well below the acceptable level of emission under the Air (Prevention and Control of Pollution) Act 1981. This necessitates the need for higher efficiency dust collectors to be installed in old thermal power stations. Further, the poor quality of the coal being received at power stations presently causes severe environmental pollution in and around the plant. This paper deals with the retrofitting of electrostatic precipitators in existing units and the problems encountered in executing the same.

  14. DIII-D ICRF high voltage power supply regulator upgrade

    International Nuclear Information System (INIS)

    Cary, W.P.; Burley, B.L.; Grosnickle, W.H.

    1997-11-01

    For reliable operation and component protection, of the 2 MW 30--120 MHz ICRF Amplifier System on DIII-D, it is desirable for the amplifier to respond to high VSWR conditions as rapidly as possible. This requires a rapid change in power which also means a rapid change in the high voltage power supply current demands. An analysis of the power supply's regulator dynamics was needed to verify its expected operation during such conditions. Based on this information it was found that a new regulator with a larger dynamic range and some anticipation capability would be required. This paper will discuss the system requirements, the as-delivered regulator performance, and the improved performance after installation of the new regulator system. It will also be shown how this improvement has made the amplifier perform at higher power levels more reliably

  15. Upgrading to lead firm position via international acquisition: learning from the global biomass power plant industry

    DEFF Research Database (Denmark)

    Hansen, Ulrich Elmer; Fold, Niels; Hansen, Teis

    2016-01-01

    This article examines the case of a Chinese firm that has upgraded to lead firm position in the global biomass power plant industry mainly through acquisitions of technological frontier firms in Denmark. Sustaining the lead firm position was, however, challenged by difficulties in developing...... innovative capability. Drawing on the literature on (i) firm-level technological capability and (ii) knowledge transfer in international acquisitions, we explain the reasons for insufficient innovative capability building. Based on these empirical findings, we suggest maintaining the existing upgrading...

  16. Approach of seismic upgrading in Kashiwazaki-Kariwa Nuclear Power Plant

    International Nuclear Information System (INIS)

    Sato, Hitoshi

    2009-01-01

    Because guide for reviewing seismic design of nuclear power reactor facilities was reworked in 2006, we formulated new Design Base Seismic Motion Ss, and we are doing evaluation of seismic safety (back-check). In Japan, depending on aseismatic importance, equipments are classified into S-class, B-class and C-class. For S-class equipments, we evaluate it on the basis of new Ss, and do seismic upgrading. For B-class and C-class equipments, we do seismic upgrading voluntarily on the basis of the experiences of the Niigataken Chuetsu-Oki (NCO) Earthquake. (author)

  17. Low voltage powering of on-detector electronics for HL-LHC experiments upgrades

    CERN Document Server

    Bobillier, Vincent; Vasey, Francois; Karmakar, Sabyasachi; Maity, Manas; Roy, Subhasish; Kundu, Tapas Kumar

    2018-01-01

    All LHC experiments will be upgraded during the next LHC long shutdowns (LS2 and LS3). The increase in resolution and luminosity and the use of more advanced CMOS technology nodes typically implies higher current consumption of the on-detector electronics. In this context, and in view of limiting the cable voltage drop, point-of-load DC-DC converters will be used on detector. This will have a direct impact on the existing powering scheme, implying new AC-DC and/or DC-DC stages as well as changes in the power cabling infrastructure. This paper presents the first results obtained while evaluating different LV powering schemes and distribution layouts for HL-LHC trackers. The precise low voltage power source requirements are being assessed and understood using the CMS tracker upgrade as a use-case.

  18. Feasibility study on Bobovdol thermal power plant upgrading project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    A survey has been made in relation with the improvement project intended of energy conservation, and reduction of global warming gas emission at the Bobovdol thermal power plant located in the suburb of Sofia, the capital of the Republic of Bulgaria. The existing Bobovdol power plant having a total capacity of 630 MW with three generators is a coal burning thermal power plant having been used already for 23 to 27 years, hence over-aged. The survey has discussed an improvement project of scrap-and-build type to make the plant a high-efficiency gas combined cycle power plant using gas turbines. The project calls for building 210-MW gas combined power generation facilities having 70-MW gas turbines, one each in three stages in 2007, 2012 and 2017. As a result of the discussions, the fuel consumption reducing rate was found to reach 37.99%, whereas the cumulative energy saving quantity in 41 years will reach 16.37 million tons of fuel oil equivalent. In addition, the reduction rate of global warming gas emission is 57.75%, and the cumulative reduction quantity in 41 years is 105.18 million tons. (NEDO)

  19. U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant

    International Nuclear Information System (INIS)

    Saraev, O.; Haase, M.; Smarto, C.; Mikkelsen, K.; Heinberg, C.; Showalter, R.; Soo Hoo, M.; Hatcher, C.; Forehand, M.

    1998-01-01

    During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers

  20. Upgrade of DC power supply system in ITER CS model coil test facility

    International Nuclear Information System (INIS)

    Shimono, Mitsugu; Uno, Yasuhiro; Yamazaki, Keita; Kawano, Katsumi; Isono, Takaaki

    2014-03-01

    Objective of the ITER CS Model Coil Test Facility is to evaluate a large scale superconducting conductor for fusion using the Central Solenoid (CS) Model Coil, which can generate a 13T magnetic field in the inner bore with a 1.5 m diameter. The facility is composed of a helium refrigerator / liquefier system, a DC power supply system, a vacuum system and a data acquisition system. The DC power supply system supplies currents to two superconducting coils, the CS Model Coil and an insert coil. A 50-kA DC power supply is installed for the CS Model Coil and two 30 kA DC power supplies are installed for an insert coil. In order to evaluate superconducting performance of a conductor used for ITER Toroidal Field (TF) coils whose operating current is 68 kA, the line for an insert coil is upgraded. A 10 kA DC power supply was added, DC circuit breakers were upgraded, bus bars and current measuring instrument were replaced. In accordance to the upgrade, operation manual was revised. (author)

  1. Nuclear instrument upgrade at Connecticut Yankee Atomic Power Station

    International Nuclear Information System (INIS)

    Brothers, M.H.; Flynn, B.J.; Shugars, H.G.

    1989-01-01

    After 20 years of commercial operation, the Connecticut Yankee Atomic Power Station decided to replace the original nuclear instrument system. The plant was motivated primarily by reliability and maintainability problems, the former attributed to equipment wearout and discrete component failure, and the latter to the unavailability of qualified spare parts, another effect of the equipment's age. In replacing the system, the plant also had to address current regulatory, design, and plant technical specification requirements, including physical separation, signal isolation, and changes in equipment qualification. This paper discusses the motivation for the system's replacement, the challenges to the plant engineers and equipment designers, the ways in which the new design met the challenges, the test results of the new system, and other potential benefits supported by the test results

  2. ASDEX Upgrade-JT-60U comparison and ECRH power requirements for NTM stabilization in ITER

    International Nuclear Information System (INIS)

    Urso, L.; Zohm, H.; Maraschek, M.; Poli, E.; Isayama, A.

    2010-01-01

    Neoclassical tearing modes (NTMs) are experimentally controlled with local electron cyclotron current drive (ECCD) and the island width decay during NTM stabilization is modelled using the so-called modified Rutherford equation (MRE). In this paper, a modelling of the MRE is carried out and simulations of the island width decay are compared with the experimentally observed ones in order to fit the two free machine-independent parameters present in the equation. A systematic study on a database of NTM stabilization discharges from ASDEX Upgrade and JT-60U is done for extrapolating the ECCD power requirements for ITER. The extrapolation to ITER of the NTM stabilization results from ASDEX Upgrade and JT-60U shows that 10 MW of ECCD power are enough to stabilize large NTMs. The 10 MW power estimate for ITER is based on the assumption that the free parameters in the MRE are machine independent. Indeed, this assumption is verified in this paper for ASDEX Upgrade and JT-60U. An interesting consequence of the relatively modest power requirement for ITER is that the installed 20 MW will suffice for simultaneous 2/1 and 3/2 NTM stabilization.

  3. H-mode confinement properties close to the power threshold in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Ryter, F; Fuchs, J; Schneider, W; Sips, A; Staebler, A; Stober, J

    2008-01-01

    Confinement properties close to the H-mode power threshold are studied in the ASDEX Upgrade tokamak. The results show that good confinement can be obtained close to the threshold with Type-I ELMs. The existence of Type-I ELMs does not necessarily require the heating power to be higher than the H-Mode power threshold, but it requires collisionality to be low enough. At higher collisionality Type-III ELMs replace the Type-I ELMs and confinement time is reduced by about 20%

  4. Constitutional determinants of nuclear power plant upgrading; Verfassungsrechtliche Determinanten bei der Nachruestung von Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Mann, Thomas [Goettingen Univ. (Germany). Lehrstuhl fuer Oeffentliches Recht, insbesondere Verwaltungsrecht; NdsOVG - Niedersaechsisches Oberverwaltungsgericht (Germany)

    2013-11-01

    Around half a year ago the European stress test for nuclear power plants, a precautionary measure initiated by the European Council in March 2011 in response to the Fukushima disaster, revealed that while German nuclear power plants show a high degree of robustness compared with those in other European countries, they nevertheless required upgrading in one or the other respect (earthquake warning systems, protection against crashing civil passenger airplanes). The present article investigates whether this upgrading requirement can justify an injunction to carry out structural retrofitting measures or whether obligations to this end can be excluded on grounds of reasonability in view of the recent decision taken by the German parliament to phase out nuclear energy.

  5. Brain Gain Malaysia (BGM): Feasibility Studies to Upgrading the Power of TRIGA PUSPATI Reactor (RTP)

    International Nuclear Information System (INIS)

    Naim Shauqi Hamzah; Mohd Fairus Abdul Farid; Julia Abdul Karim

    2011-01-01

    BGM Programme introduced by MOSTI has give the opportunities for Reactor Technology Division to get the expertise from Romania for upgrading the power output of RTP. 2 and a half months programme include expertise development in neutronic fields and thermal hydraulics and also introduction of reactor technology to IPTA and IPTS students. This programme also benefited the staffs of BTR as activities conducted intensively and hands-on to make the researchers can improved their knowledge on related computer code effectively. (author)

  6. Feasibility of maintaining natural convection mode core cooling in research reactor power upgrades

    International Nuclear Information System (INIS)

    Ha, J.J.; Belhadj, M.; Aldemir, T.; Christensen, R.N.

    1987-01-01

    Two operational concerns for natural convection coooled research reactors using plate type fuels are: 1) pool top 16 N activity (PTNA), and 2) nucleate boiling in core channels. The feasibility assessment of a power upgrade while maintaining natural convection mode core cooling requires addressing these operational concerns. Previous studies have shown that: a) The conventional technique for reducing PTNA by plume dispersion may not be effective in a large power upgrade of research reactors with small pools. b) Currently used correlations to predict onset of nucleate boiling (ONB) in thin, rectangular core channels are not valid for low-velocity, upward flows such as encountered in natural convection cooling. The PTNA depends on the velocity distribution in the reactor pool. COMMIX-1A code is used to determine the three-dimensional velocity fields in The Ohio State University Research Reactor (OSURR) pool as a function of varying design conditions, following a power upgrade to 500 kW with LEU fuel. It is shown that a sufficiently deep stagnant water layer can be created below the pool top by properly choosing the disperser flow rate. The ONB heat flux is experimentally determined for channel gaps and upward flow velocities in the range 2mm-4mm and 3-16 cm/sec., respectively. Two alternatives to plume dispersion for reducing PTNA and a new correlation to determine the ONB heat flux in thin, rectangular channels under low-velocity, upward flow conditions are proposed. (Author)

  7. Empiricial scaling of inter-ELM power widths in ASDEX Upgrade and JET

    Energy Technology Data Exchange (ETDEWEB)

    Eich, T., E-mail: teich@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, D-85748 Garching (Germany); Sieglin, B.; Scarabosio, A.; Herrmann, A.; Kallenbach, A. [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, D-85748 Garching (Germany); Matthews, G.F. [EURATOM/CCFE Association, Culham Science Centre, Abingdon, Oxon OX14 3DB (United Kingdom); Jachmich, S. [ERM-KMS, EURATOM Association, Brussels (Belgium); Brezinsek, S.; Rack, M. [IEK-4, Forschungszentrum Jülich, EURATOM Association (Germany); Goldston, R.J. [Princeton Plasma Physics Labaratory, Princeton, NJ 08543 (United States)

    2013-07-15

    The SOL power decay length (λ{sub q}) deduced from analysis of fully attached divertor heat load profiles from two tokamaks, JET and ASDEX Upgrade with carbon plasma facing components, are presented. Interpretation of the target heat load profiles is performed by using a 1D-fit function which disentangles the upstream λ{sub q} and an effective diffusion in the divertor (S), the latter essentially acting as a power spreading parameter in the divertor volume. It is shown that the so called integral decay length λ{sub int} is approximately given by λ{sub int}≈λ{sub q}+1.64×S. An empirical scaling reveals parametric dependency λ{sub q}/mm≃0.9·B{sub T}{sup -0.7}q{sub cyl}{sup 1.2}P{sub SOL}{sup 0}R{sub geo}{sup 0} for type-I ELMy H-modes. Extrapolation to ITER gives λ{sub q}≃1 mm. Recent measurements in JET-ILW and from ASDEX Upgrade full-W confirm the results. It is shown that a regression for the divertor power spreading parameter S is not yet possible due to the large effect of different divertor geometries of JET and ASDEX Upgrade Divertor-I and Divertor-IIb.

  8. Digitalizing upgrade of the power supplies for the extraction septum magnets in HIRFL-CSR

    International Nuclear Information System (INIS)

    Zhao Jiang; Zhang Huajian; Wu Fengjun; Yuan Zhendong; Chen Youxin; Huang Yuzhen; Gao Daqing

    2014-01-01

    This paper introduces the working principle of the power supplies for the septum magnets in HIRFL-CSR and presents a feasible scheme of digitalizing these power supplies. The scheme employed the SOPC (system-on-a-programmable-chip) technology based on FPGA, the software framework of NIOSII and the polycyclic adjustment algorithm realized by the hardware description language. Then, several key problems that could be encountered in realizing the power supply control algorithm on FPGA were discussed. After the power supplies were upgraded, the beam of HIRFL-CSR was extracted more reliably and the stability of beam spot position at the experimental terminals has been obviously improved. This work would provide a valuable reference for the engineers of digitalizing other magnetic power supplies in HIRFL-CSR and of developing magnetic power supplies for heavy ion cancer therapy. (authors)

  9. Upgrade of the synchronous data management system of the EAST poloidal field power supply

    International Nuclear Information System (INIS)

    Zhu, Lili; Huang, Liansheng; Fu, Peng; Gao, Ge; He, Shiying

    2016-01-01

    Highlights: • The upgraded synchronous data management system of EAST poloidal field power supply supports long-pulse data storage. • Slice storage mechanism on MDSplus has been adopted for quasi real-time data storage. • The state machine has been adopted for managing the system sequencer. • IEEE-1588 protocol via Ethernet for the synchronization of clock signal was detailed described. - Abstract: Poloidal field (PF) power supply is an important subsystem of the Experimental Advanced Superconducting Tokamak (EAST). The upgrade of the PF control system of EAST is a great improvement over the original data management system which could not meet the requirements necessary for experiments on synchronization, modularity and sampling rate. In order to better analyze the power operation performance, the Synchronization Data Management System (SDMS) needs to be upgraded as well. This upgrade is based on distributed data acquisition and an MDSPLUS database. It consists of three data acquisition nodes synchronized by an reference clock from the EAST central timing system that also provides the start trigger of the EAST pulse. After being processed by a signal conditioning unit, experimental signals are digitized and written into the database in MDSPLUS format. Multi-channel, multi-tasking and continuous data storage have been achieved by using multi-threading technology on a Linux operation system. The SDMS has been used on the server in PF control system for the entire 2015 EAST campaign. The SDMS has had good performance during experiments and convenient human-machine interface to satisfy the requirements of all the experiments.

  10. Upgrade of the synchronous data management system of the EAST poloidal field power supply

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Lili; Huang, Liansheng, E-mail: huangls@ipp.ac.cn; Fu, Peng; Gao, Ge; He, Shiying

    2016-11-15

    Highlights: • The upgraded synchronous data management system of EAST poloidal field power supply supports long-pulse data storage. • Slice storage mechanism on MDSplus has been adopted for quasi real-time data storage. • The state machine has been adopted for managing the system sequencer. • IEEE-1588 protocol via Ethernet for the synchronization of clock signal was detailed described. - Abstract: Poloidal field (PF) power supply is an important subsystem of the Experimental Advanced Superconducting Tokamak (EAST). The upgrade of the PF control system of EAST is a great improvement over the original data management system which could not meet the requirements necessary for experiments on synchronization, modularity and sampling rate. In order to better analyze the power operation performance, the Synchronization Data Management System (SDMS) needs to be upgraded as well. This upgrade is based on distributed data acquisition and an MDSPLUS database. It consists of three data acquisition nodes synchronized by an reference clock from the EAST central timing system that also provides the start trigger of the EAST pulse. After being processed by a signal conditioning unit, experimental signals are digitized and written into the database in MDSPLUS format. Multi-channel, multi-tasking and continuous data storage have been achieved by using multi-threading technology on a Linux operation system. The SDMS has been used on the server in PF control system for the entire 2015 EAST campaign. The SDMS has had good performance during experiments and convenient human-machine interface to satisfy the requirements of all the experiments.

  11. Booster main magnet power supply, present operation and potential future upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Bajon, E.; Bannon, M.; Marneris, I.; Danowski, G.; Sandberg, J.; Savatteri, S.

    2011-03-28

    The Brookhaven Booster Main Magnet Power Supply (MMPS) is a 24 pulse thyristor control supply, rated at 5500 Amps, +/-2000 Volts, or 3000 Amps, +/-6000 Volts. The power supply is fed directly from the power utility and the peak magnet power is 18 MWatts. This peak power is seen directly at the incoming ac line. This power supply has been in operation for the last 18 years. This paper will describe the present topology and operation of the power supply, the feedback control system and the different modes of operation of the power supply. Since the power supply has been in operation for the last 18 years, upgrading this power supply is essential. A new power supply topology has been studied where energy is stored in capacitor banks. DC to DC converters are used to convert the dc voltage stored in the capacitor banks to pulsed DC voltage into the magnet load. This enables the average incoming power from the ac line to be constant while the peak magnet power is pulsed to +/- 18 MWatts. Simulations and waveforms of this power supply will be presented.

  12. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    Directory of Open Access Journals (Sweden)

    Krstić Dušan B.

    2016-01-01

    Full Text Available By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned modernization of production aggregates and associated equipment, the upgrade of annexes above the aggregate siphons A1 and A2, as well as the upgrade of the annexes of the powerhouse on the right bank of the river in the function of accommodation of electrical equipment. By replacing of the vital parts of turbines with increasing diameter with an increase of efficiency, Bow and power, as well as replacing generators with new generator of higher power with excitation and all the necessary auxiliary equipment, will ensure reliable operation of the hydroelectric power plant and will extend the working life of the next 40 years, creating opportunities for retrofitting additional fifth unit.

  13. Status of the upgraded version of the NRL GAMBLE II pulse power generator

    International Nuclear Information System (INIS)

    Boller, J.R.; Burton, J.K.; Shipman, J.D. Jr.

    1979-01-01

    The GAMBLE II water dielectric pulse power generator, in 1970, was the forerunner of the high energy (> 50 kJ) class of water dielectric generators. It has been redesigned internally to make maximum use of its original outer conductor shell and to optimize it for the positive polarity mode of operation for positive ion beam experimentation. The new design also initiates the use of an oil dielectric multi-channel switch at the output of the pulse forming line. This switch, because of its low capacitance, eliminates the need for an extra prepulse switch. The upgraded version has been tested up to power and energy levels which are nearly twice the original

  14. The magnet power control system for the tandem mirror experiment-upgrade

    International Nuclear Information System (INIS)

    Bell, H.H.

    1983-01-01

    This paper describes the desktop computer/CAMAC based system that controls the power source for the Tandem Mirror Experiment-Upgrade (TMX-U) magnet power system. Presently it contains 42 dc rectifier power supplies connected to 24 magnet coils arranged in 17 circuits. During each shot, the system delivers 22.6 MW dc to the magnets for about 3 s. The system is presently being changed to add six power supplies, two solenoidal throttle coils, and two reverse C-coils. When complete, the delivered power will increase to 36.9 MW. The closed-loop control system usually provides current (and thus, magnetic field) that is within 1% of the requested current. Achieving this accuracy required using grounding, shielding, and isolation methods to reduce noise and related problems

  15. Dynamic analysis of compact helical system power supply and designs of its upgrade

    International Nuclear Information System (INIS)

    Tanahashi, S.; Yamada, S.

    1991-09-01

    Computed dynamic waveforms are compared with measured ones for the power supply of the Compact Helical System (CHS) during 1.5T operation and found to be in good agreement. On the basis of these results, designs for the upgraded power supply for 2T operation are discussed in the two cases, with and without power consumption for additional heating. In the former case, the additional heating power is supplied from the ac generator that powers the CHS coils. Electric voltages and currents in the electric circuit are shown for both cases. These designs show the possibility for 2T operation by addition of some components without changing the ratings of existing components. (author)

  16. 50 ns Backup Solution

    CERN Document Server

    Kain, V; Bartosik, H; Goddard, B; Höfle, W; Iadarola, G; Meddahi, M; Pieloni, T; Rumolo, G; Salvant, B; Wenninger, J

    2014-01-01

    The baseline bunch spacing for LHC high luminosity proton-proton operation after LS3 is 25 ns to maximize the integrated luminosity while keeping the pile-up low. The success of this mode of operation is not guaranteed. Electron cloud, UFOs, long-range beambeam, heating and other effects might make 25 ns operation in the LHC and/or the injectors difficult. This talk will review possible showstoppers in the LHC and injectors for 25 ns operation and discuss possible remedies. An alternative would be re-considering 50 ns operation. An estimate of the 50 ns performance will be given. The question of whether a different upgrade path would have to be chosen in case of 50 ns operation will also be addressed.

  17. 50 ns Backup Solution

    International Nuclear Information System (INIS)

    Kain, V; Arduini, G; Bartosik, H; Goddard, B; Höfle, W; Iadarola, G; Meddahi, M; Pieloni, T; Rumolo, G; Salvant, B; Wenninger, J

    2014-01-01

    The baseline bunch spacing for LHC high luminosity proton-proton operation after LS3 is 25 ns to maximize the integrated luminosity while keeping the pile-up low. The success of this mode of operation is not guaranteed. Electron cloud, UFOs, long-range beambeam, heating and other effects might make 25 ns operation in the LHC and/or the injectors difficult. This talk will review possible showstoppers in the LHC and injectors for 25 ns operation and discuss possible remedies. An alternative would be re-considering 50 ns operation. An estimate of the 50 ns performance will be given. The question of whether a different upgrade path would have to be chosen in case of 50 ns operation will also be addressed

  18. A HIGH BANDWIDTH BIPOLAR POWER SUPPLY FOR THE FAST CORRECTORS IN THE APS UPGRADE*

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Ju; Sprau, Gary

    2017-06-25

    The APS Upgrade of a multi-bend achromat (MBA) storage ring requires a fast bipolar power supply for the fast correction magnets. The key performance requirement of the power supply includes a small-signal bandwidth of 10 kHz for the output current. This requirement presents a challenge to the design because of the high inductance of the magnet load and a limited input DC voltage. A prototype DC/DC power supply utilizing a MOSFET H-bridge circuit with a 500 kHz PWM has been developed and tested successfully. The prototype achieved a 10-kHz bandwidth with less than 3-dB attenuation for a signal 0.5% of the maximum operating current of 15 amperes. This paper presents the design of the power circuit, the PWM method, the control loop, and the test results.

  19. Active Control of Power Exhaust in Strongly Heated ASDEX Upgrade Plasmas

    Science.gov (United States)

    Dux, Ralph; Kallenbach, Arne; Bernert, Matthias; Eich, Thomas; Fuchs, Christoph; Giannone, Louis; Herrmann, Albrecht; Schweinzer, Josef; Treutterer, Wolfgang

    2012-10-01

    Due to the absence of carbon as an intrinsic low-Z radiator, and tight limits for the acceptable power load on the divertor target, ITER will rely on impurity seeding for radiative power dissipation and for generation of partial detachment. The injection of more than one radiating species is required to optimise the power removal in the main plasma and in the divertor region, i.e. a low-Z species for radiation in the divertor and a medium-Z species for radiation in the outer core plasma. In ASDEX Upgrade, a set of robust sensors, which is suitable to feedback control the radiated power in the main chamber and the divertor as well as the electron temperature at the target, has been developed. Different feedback schemes were applied in H-mode discharges with a maximum heating power of up to 23,W, i.e. at ITER values of P/R (power per major radius) to control all combinations of power flux into the divertor region, power flux onto the target or electron temperature at the target through injection of nitrogen as the divertor radiator and argon as the main chamber radiator. Even at the highest heating powers the peak heat flux density at the target is kept at benign values. The control schemes and the plasma behaviour in these discharges will be discussed.

  20. OVERVIEW OF A RECONFIGURABLE SIMULATOR FOR MAIN CONTROL ROOM UPGRADES IN NUCLEAR POWER PLANTS

    Energy Technology Data Exchange (ETDEWEB)

    Ronald L. Boring

    2012-10-01

    This paper provides background on a reconfigurable control room simulator for nuclear power plants. The main control rooms in current nuclear power plants feature analog technology that is growing obsolete. The need to upgrade control rooms serves the practical need of maintainability as well as the opportunity to implement newer digital technologies with added functionality. There currently exists no dedicated research simulator for use in human factors design and evaluation activities for nuclear power plant modernization in the U.S. The new research simulator discussed in this paper provides a test bed in which operator performance on new control room concepts can be benchmarked against existing control rooms and in which new technologies can be validated for safety and usability prior to deployment.

  1. HOW ECOLOGICAL ENGINEERING HELPED TO CONTINUE BUILDING AND UPGRADE OF THE OPOLE POWER PLANT

    Directory of Open Access Journals (Sweden)

    Jan Siuta

    2016-09-01

    Full Text Available Principles of ecological engineering were applied for upgrading the Opole Power Plant under construction, complete with modern installation to protect the environment. The modernized project was a subject of „Integrated environmental impact assessment of the Opole Power Plant” developed by the Institute of Environmental Protection in 1981. The main issues covered by the impact assessment were presented and discussed at the national scientific conference attended, among others, by the representatives of local community from Opole. The conference was organized by the Polish Society of Ecological Engineering on June 5 and 6, 1992. The main aim of the conference was to identify and deliver as broad as possible analysis of environmental conditions for designing, building and operating coal fired power plants. A secondary goal, though of main concern for the Opole agglomeration, was to evaluate many-sided environmental risks resulting from the construction and operation of the Power Plant. The feasibility of continuing the construction of a power generating facility that meets the requirements of the 21st century was demonstrated by the fact that the Opole Power Plant S.A. was awarded the ISO 14001 - Environmental Management System certificate by the British Standards Institution. Advanced construction of the two consecutive blocks of a combined power of 1800 MW in the Opole Power Plant substantiates the validity and effectiveness of the conference organized in 1992.

  2. Upgrade of KNPEC no.2 Simulator for Kori Unit 3 Power Uprating

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Jin-Hyuk; Lee, Seung-Ho [KEPRI, Daejeon (Korea, Republic of)

    2007-07-01

    Kori-Unit 3 and 4 is preparing the operation of the power-uprating (2900MWt), and therefore the Korea regulatory body(KINS) requested the operator training with the simulator reflecting the power-uprating. As a result of the intensive research and expertise of KEPRI on the simulators, KEPRI accomplished the upgrade project of KNPEC no.2 simulator for Kori-Unit 3 power-uprating. This project includes various high-tech methods incorporating - realtime neutronics model based on MASTER (Multi-purpose Analyzer for Static and Transient Effects of Reactors) code, best-estimate neutronics code by the KINS, (By using the RMASTER, the precision of the simulation of the neutron behaviors in the core is highly improved.) - betterment of the reactor coolant system and the balance-of-plant system - modification of the corresponding setpoints due to the power-uprating And the acceptance test procedure (ATP) was successfully carried out through the integration of system models and its performance tests. Through the success of this project, the operator training for the power uprating of the Kori-Unit 3 will be accomplished before its power operation and, after all, this simulator will contribute to the safe operation for the power-uprating of the Kori-Unit 3 and 4.

  3. New drive converter and digital control for the pulsed power supply system of ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Käsemann, Claus-Peter, E-mail: c.p.kaesemann@ipp.mpg.de [Max Planck Institute for Plasma Physics, Boltzmannstraße 2, 85748 Garching (Germany); Jacob, Christian; Nguyen, Hong Ha; Stobbe, Ferdinand; Mayer, Alois [Max Planck Institute for Plasma Physics, Boltzmannstraße 2, 85748 Garching (Germany); Sachs, Edgar; Klein, Reiner [Siemens AG, Industrial Automation Systems, Gleiwitzer Straße 555, 90475 Nürnberg (Germany)

    2015-10-15

    Highlights: • IGBT converter system with integrated control. • Proven technology reduces time and budget. • Flexibility to be integrated into a 35 years old installation. • Stable control algorithms for static and dynamic speed control. • Possibilities for active and reactive power management. - Abstract: Safety and reliability are major issues for the ASDEX Upgrade (AUG) pulsed power supply systems. To avoid long downtimes during an experimental campaign, fault-prone components have to be identified and treated early. This becomes even more important due to the AUG participation in the EUROfusion Medium Sized Tokamak (MST) program. Operating equipment which is up to 40 years old adds additional complications. This contribution describes one such example where a 35 year old flywheel generator at AUG was identified as fault-prone and pre-emptively upgraded with a new drive converter with integrated control. Most challenging was to adapt a modern converter, originally designed for wind turbines, toward a drive system for a flywheel-motor-generator system. To identify the layout of the controller and the control parameters, accurate modeling and comprehensive simulations were performed. This effort paid off during commissioning and measuring results verified the calculated design values. Finally, the system shows good performance during AUG plasma experiments.

  4. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    International Nuclear Information System (INIS)

    Kelley, S.; Bolian, T. W.

    2006-01-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations

  5. Reactive Power Support of Electrical Vehicle Charging Station Upgraded with Flywheel Energy Storage System

    DEFF Research Database (Denmark)

    SUN, BO; Dragicevic, Tomislav; Savaghebi, Mehdi

    2015-01-01

    Electrical vehicles (EVs) are presenting increasingly potential to replace the conventional fossil fuel based vehicles due to environmental friendly characteristic. Accordingly, Charging Stations (CS), as an intermediate between grid and large numbers of EVs, are supposed to have more critical...... influence on future smart transportation network. This paper explores an off-board charging station upgraded with flywheel energy storage system that could provide a reactive power support to the grid utility. A supervisory control scheme based on distributed bus signaling is proposed to coordinate...... the operation of each component in the system. As a result, the charging station could supply the reactive power support to the utility grid without compromising the charging algorithm and preserve the battery’s lifetime. Finally, the real-time simulation results based on dSPACE1006 verifies the proposed...

  6. A comparison of advanced thermal cycles suitable for upgrading existing power plant

    International Nuclear Information System (INIS)

    Heyen, G.; Kalitventzeff, B.

    1999-01-01

    In view of the constant growth of electricity usage and public pressure to reduce the dependence on nuclear power plants in the energy supply, solutions are sought to increase the capacity of power plants using fossil fuels. Highly efficient cycles are available: gas turbines combined with waste heat boilers and steam cycles are able to achieve efficiencies above 50-55%. However building new plants requires a large amount of capital.Alternative proposals are based on upgrades of existing plants : capital savings are expected by reusing part of the facilities. In the present study, three parallel proposals are compared on the basis of exergy efficiency; cost of investment and flexibility of operation are also discussed. They are compared with classical Rankine cycle and state of the art combined cycles. (Copyright (c) 1999 Elsevier Science B.V., Amsterdam. All rights reserved.)

  7. Constructing an I and C Upgrade Architecture for Korea Standard Nuclear Power Plants

    International Nuclear Information System (INIS)

    Suh, Yong Suk; Hur, Seop; Kim, Dong Hoon; Sung, Chan Ho; Kang, Hyun Tai; Lee, Jae Ki; Cho, Chang Hwan

    2008-01-01

    This paper presents three architectures of the KSNP I and C upgrade. The architectures are constructed with an adoption of PLCs and DCS technology and 3-phase upgrade strategy. The 3-phase upgrade strategy is established to ensure the safety of the upgrade. Based on the architecture, the cabinet configuration is being constructed. From the configuration, it is expected to figure out how to optimize the layout of the cabinets. It is required to study the performance and safety design requirements of the upgrade further

  8. A new algorithm to determine the total radiated power at ASDEX upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Gloeggler, Stephan; Bernert, Matthias; Eich, Thomas [Max Planck Institute for Plasma Physics, Boltzmannstr. 2, 85748 Garching (Germany); Collaboration: The ASDEX Upgrade Team

    2016-07-01

    Radiation is an essential part of the power balance in a fusion plasma. In future fusion devices about 90% of the power will have to be dissipated, mainly by radiation. For the development of an appropriate operational scenario, information about the absolute level of plasma radiation (P{sub rad,tot}) is crucial. Bolometers are used to measure the radiated power, however, an algorithm is required to derive the absolute power out of many line-integrated measurements. The currently used algorithm (BPD) was developed for the main chamber radiation. It underestimates the divertor radiation as its basic assumptions are not satisfied in this region. Therefore, a new P{sub rad,tot} algorithm is presented. It applies an Abel inversion on the main chamber and uses empirically based assumptions for poloidal asymmetries and the divertor radiation. To benchmark the new algorithm, synthetic emissivity profiles are used. On average, the new Abel inversion based algorithm deviates by only 10% from the nominal synthetic value while BPD is about 25% too low. With both codes time traces of ASDEX Upgrade discharges are calculated. The analysis of these time traces shows that the underestimation of the divertor radiation can have significant consequences on the accuracy of BPD while the new algorithm is shown to be stable.

  9. High power electron cyclotron heating in ISX and ORMAK Upgrade at ORNL

    International Nuclear Information System (INIS)

    England, A.C.; Eldridge, O.C.; Marcus, F.B.; Sprott, J.C.; Namkung, W.; Wilgen, J.B.

    1976-05-01

    A phased program of plasma heating at the electron cyclotron frequency is proposed for the Oak Ridge tokamaks ISX and ORMAK Upgrade. The past history of the program of electron cyclotron heating (ECH) at ORNL on mirrors and in the ELMO Bumpy Torus has been successful. Future technological developments in the production of high power high frequency microwave tubes look promising at this time. The physics of wave propagation and particle heating are fairly well understood and indicate the viability of this technique. Studies on breakdown and on runaway electron reduction will provide useful information for larger machines. Recent experiments in the USSR on small tokamaks have shown that ECH is a viable heating technique. Providing that the microwave tubes become available, the engineering considerations suggest that the technique is practical and workable, based on present day technology

  10. Thyristor crowbar system for the high current power supplies of ASDEX upgrade

    International Nuclear Information System (INIS)

    Kaesemann, C.-P.; Lieshout, L. van; Huart, M.; Sihler, C.

    2005-01-01

    The ohmic heating system and the poloidal field coils of ASDEX upgrade are supplied by 15 thyristor converter units with an installed apparent power of 600 MVA. To protect the thyristor converters against dc overvoltage arising from abnormal operations and resulting damages caused by the large energy stored in the AUG magnet coils an overvoltage protection system was required. The paper describes the motivation for-and the design and testing of the thyristor crowbar system representing the thyristor converter overvoltage protection system. It will present the layout, analyse the results of measurements obtained during commissioning, compare them to the calculated (design) values and report on the first experience of operation on the AUG coils improving the safety of the equipment

  11. Autothermal upgrading of biomass and wastes for clean and efficient production of power

    Energy Technology Data Exchange (ETDEWEB)

    Rafal Kobylecki; Zbigniew Bis; Wojciech Nowak [Czestochowa University of Technology (Poland)

    2005-07-01

    In this paper it is demonstrated that the main barrier of large scale heat and electricity production from biomass may be significantly reduced or eliminated by fuel upgrading and thermal treatment in a specially-designed pilot plant autothermal reactor. The process does not require significant amount of additional energy, since the whole process is run autothermal. The process final products are hot flue gases and a solid residue called a 'biocarbon' of LHV of roughly 28 MJ/kg. The properties of the biocarbon were similar, regardless of the input raw fuel type (biomass, waste, sewage sludge, energy crops, etc.). The use of the biocarbon for direct co-combustion with coal does not require installation of any additional feeding or fuel treatment systems at the power plants. Apart from its possible direct combustion, the biocarbon can be also efficiently used as a promising solid energy carrier for other processes (e.g. fuel cells). 6 refs., 6 figs.

  12. Experiences with the upgraded SKP system during refuelling Paks nuclear power plant

    International Nuclear Information System (INIS)

    Baranyai, A.; Hetzmann, A.

    1997-01-01

    In order to control the neutron flux during the refueling period, new measuring chains were developed and put into operation by the experts of KFKI-RegTron Co., Ltd. and the Paks Nuclear Power Plant with the purpose of partially substituting the original Refuelling Neutron Monitoring system (SKP) of WWER-440 reactor units. The modified monitoring system processes the signals of detectors located in channels outside the core. The outputs of measurement amplifiers equipped with up-to-date electronics fit in the original system perfectly. Use of the out-of-core measuring technique confirmed the preliminary expectations: interference sensitivity has decreased, the neutron/gamma ration increased and refueling time has become shorter by one to one-and-a-half day. The paper details the reasons for upgrading, the essence of utilized solutions and the operational experience. (author)

  13. Upgrade of the SLAC SLED II Pulse Compression System Based on Recent High Power Tests

    International Nuclear Information System (INIS)

    Vlieks, A.E.; Fowkes, W.R.; Loewen, R.J.; Tantawi, S.G.

    2011-01-01

    the key components of SLED-II; the Magic Tee and the 'Flower Petal' mode converter (converts between TE 10 rectangular and TE 01 circular modes), were not robust enough at higher power levels. Because of this, a major effort is underway to upgrade the existing devices to operate stably at the higher power levels, and also to investigate new components, which have inherently low field enhancement in their design and therefore more robust.

  14. Upgrading Planning and Executive Strategy for Reactor Protection System and Relative Equipment in Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jiang Zuyue

    2010-01-01

    Qinshan Nuclear Power Plant (QNPP) is the first nuclear power plant in China which completed the reactor protection system (RPS) upgrading with new digital safety instrumentation and control (I and C) platform instead of original analog system. At the same time,the nuclear instrumentation system (NIS) was upgraded with the same digital I and C platform. For adapting QNPP's actual engineering situation,the upgrading planning was taken by comprehensively investigating current development and application of digital safety I and C platform in the worldwide scope and by reviewing plant's original systems operation history. The project executive strategy-QNPP's leading role with necessary overseas cooperation and internal technical supports as great as possible, was determined. Some significant factors might influence and restrict the RPS and relative equipment upgrading executive actions in an operating NPP were analyzed.Finally, the engineering feasibility was briefly assessed to recognize the anticipated issues and difficulties and to prepare the relative solutions in advance for the purpose of ensuring the RPS upgrading objectives completely realized. (authors)

  15. Power requirements of biogas upgrading by water scrubbing and biomethane compression: Comparative analysis of various plant configurations

    International Nuclear Information System (INIS)

    Budzianowski, Wojciech M.; Wylock, Christophe E.; Marciniak, Przemysław A.

    2017-01-01

    Highlights: • Insights into power requirements of biomethane production from biogas are provided. • Process model is constructed, validated and simulated. • High-pressure and low-pressure plant operation in different configurations is compared. - Abstract: Biogas upgrading by water scrubbing followed by biomethane compression is an environmentally benign process. It may be achieved using various plant configurations characterised by various power requirements with associated effects on biomethane sustainability. Therefore, the current study has been undertaken to systematically investigate the power requirements of a range of water scrubbing options. Two groups of water scrubbing are analysed: (1) high pressure water scrubbing (HPWS) and (2) near-atmospheric pressure water scrubbing (NAPWS). A water scrubbing plant model is constructed, experimentally validated and simulated for seven upgrading plant configurations. Simulation results show that the power requirement of biogas upgrading in HPWS plants is mainly associated with biogas compression. In contrast, in NAPWS plants the main power is required for water pumping. In both plants the compression of the biomethane from atmosphereic pressure to 20 MPa also contributes remarkably. It is observed that the lowest specific power requirement can be obtained for a NAPWS plant without water regeneration (0.24 kW h/Nm"3 raw biogas) but this plant requires cheap water supply, e.g. outlet water from a sewage treatment plant or river. The second is HPWS without flash (0.29 kW h/Nm"3 raw biogas). All other HPWS with flash and NAPWS with water regeneration plants have specific power requirements between 0.30 and 0.33 kW h/Nm"3 raw biogas. Biogas compression without upgrading requires about 0.29 kW h/Nm"3 raw biogas. The thermodynamic efficiency of biogas upgrading is between 2.2% and 9.8% depending on the plant configuration while biomethane compression efficiency is higher, about 55%. This result implies that the

  16. Proposed power upgrade of the hot fuel examination facility's neutron radiography reactor

    International Nuclear Information System (INIS)

    Pruett, D.P.; Richards, W.J.; Heidel, C.C.

    1984-01-01

    The Hot Fuel Examination Facility, HFEF, is one of several facilities located at the Argonne Site. HFEF comprises a large hot cell where both non-destructive and destructive examination of highly-irradiated reactor fuels are conducted in support of the LMFBR program. One of the non-destructive examination techniques utilized at HFEF is neutron radiography. When the NRAD facility was designed and constructed, an operating power level of 250 kw was considered to be adequate for obtaining radiographs of the type of specimens envisaged at that time. Since that time, several things have occurred that have tended to increase radiography exposure times to as much as 90 minutes each. In order to decrease exposure times, the reactor power level is to be increased from 250 kW to 1 MW. This increase in power will necessitate several engineering and design changes. The proposed upgrade of the NRAD facility will increase the neutron flux available in the beam tubes appreciably. The increased flux will enable NRAD to continue to meet its operational commitments in a timely manner and to develop state-of-the-art techniques in the future as it has in the past

  17. Armenian nuclear power plant: US NRC assistance programme for seismic upgrade and safety analysis

    International Nuclear Information System (INIS)

    Simos, N.; Perkins, K.; Jo, J.; Carew, J.; Ramsey, J.

    2003-01-01

    This paper summarizes the U.S. Nuclear Regulatory Commission's (US NRC) technical support program activities associated with the Armenian Nuclear Power Plant (ANPP) safety upgrade. The US NRC program, integrated within the overall IAEA-led initiative for safety re-evaluation of the WWER plants, has as its main thrust the technical support to the Armenian Nuclear Regulatory Authority (ANRA) through close collaboration with the scientific staff at Brookhaven National Laboratory (BNL). Several major technical areas of support to ANRA form the basis of the NRC program. These include the seismic re-evaluation and upgrade of the ANPP, safety evaluation of critical systems, and the generation of the Safety Analysis Report (SAR). Specifically, the seismic re-evaluation of the ANPP is part of a broader activity that involves the re-assessment of the seismic hazard at the site, the identification of the Safe Shutdown Equipment at the plant and the evaluation of their seismic capacity, the detailed modeling and analysis of the critical facilities at ANPP, and the generation of the Floor Response Spectra (FRS). Based on the new spectra that incorporate all new findings (hazard, site soil, structure, etc.), the overall capacity of the main structures and the seismic capacity of the critical systems are being re-evaluated. In addition, analyses of critical safe shutdown systems and safe shutdown processes are being performed to ensure both the capabilities of the operating systems and the enhancement of safety due to system upgrades. At present, one of the principal goals of the US NRC's regulatory assistance activities with ANRA is enhancing ANRA's regulatory oversight of high-priority safety issues (both generic and plant-specific) associated with operation of the ANPP. As such, assisting ANRA in understanding and assessing plant-specific seismic and other safety issues associated with the ANPP is a high priority given the ANPP's being located in a seismically active area

  18. Seismic analysis of two 1050 mm diameter heavy water upgrading towers for 235 MWe Kaiga Atomic Power Plant Site

    International Nuclear Information System (INIS)

    Soni, R.S.; Kushwaha, H.S.; Mahajan, S.C.; Kakodkar, A.; Narwaria, Suresh; Vardarajan, T.G.; Sadhukhan, H.K.

    1992-01-01

    This report deals with the analysis carried out for the evaluation of earthquake induced stresses and deflections in two 1050 mm diameter heavy water upgrading towers for Kaiga Atomic Power Plant Site. The analysis of upgrading tower has been carried out for two mutually perpendicular horizontal excitations and one vertical excitation applied simultaneously. The upgrading towers have been analysed using beam model taking into account soil-structure interaction. Response spectrum analysis has been carried out using site spectra for 235 MWe Kaiga reactor site. The seismic analysis has been performed for both the towers with supporting structure along with concrete pedestals and raft foundation. The towers have been checked for its stability due to compressive stresses to avoid buckling so that the nearby safety related structures are not geopardised in the event of safe shutdown earthquake (SSE) loading. (author). 14 refs., 12 figs., 18 tabs

  19. Mechanical braking system for the pulsed power supply system of ASDEX Upgrade

    International Nuclear Information System (INIS)

    Käsemann, C.-P.; Huart, M.; Stobbe, F.; Goldstein, I.; Sigalov, A.; Sachs, E.; Perk, E.

    2013-01-01

    Highlights: ► Compact and innovative solution for dumping of large kinetic energy. ► Small mass of energy converter at the shaft due to circulating storage medium. ► Design of the active parts ensures flat torque/power characteristics. ► Also suitable for spending a great part of operating life in “Freewheeling” mode. -- Abstract: A few years ago, IPP reviewed the safety of the ASDEX Upgrade pulsed power supply system. Two critical sub-systems had been identified: The (electrical) braking system for the flywheel generators and the oil lubrication system for the shaft bearings. A simultaneous failure of these two systems may lead to severe damages and could have consequences for the safety of operating personnel. Therefore a second, independent braking possibility for every generator was stipulated. Especially the challenges adapting a dynamometer, originally designed for motor test benches, towards a plant safety system for generator EZ4 will be described in the paper. Further on, the paper will present the problems, implementing such a system into an existing installation, including the calculation of the required supporting structure, balancing of the extended shaft line and required water cooling and control. Finally it will report on the performance achieved during operation

  20. Ion cyclotron resonance heating systems upgrade toward high power and CW operations in WEST

    Energy Technology Data Exchange (ETDEWEB)

    Hillairet, Julien, E-mail: julien.hillairet@cea.fr; Mollard, Patrick; Bernard, Jean-Michel; Argouarch, Arnaud; Berger-By, Gilles; Charabot, Nicolas; Colas, Laurent; Delaplanche, Jean-Marc; Ekedahl, Annika; Fedorczak, Nicolas; Ferlay, Fabien; Goniche, Marc; Hatchressian, Jean-Claude; Helou, Walid; Jacquot, Jonathan; Joffrin, Emmanuel; Litaudon, Xavier; Lombard, Gilles; Magne, Roland; Patterlini, Jean-Claude [CEA, IRFM, F-13108 Saint Paul-lez-Durance (France); and others

    2015-12-10

    The design of the WEST (Tungsten-W Environment in Steady-state Tokamak) Ion cyclotron resonance heating antennas is based on a previously tested conjugate-T Resonant Double Loops prototype equipped with internal vacuum matching capacitors. The design and construction of three new WEST ICRH antennas are being carried out in close collaboration with ASIPP, within the framework of the Associated Laboratory in the fusion field between IRFM and ASIPP. The coupling performance to the plasma and the load-tolerance have been improved, while adding Continuous Wave operation capability by introducing water cooling in the entire antenna. On the generator side, the operation class of the high power tetrodes is changed from AB to B in order to allow high power operation (up to 3 MW per antenna) under higher VSWR (up to 2:1). Reliability of the generators is also improved by increasing the cavity breakdown voltage. The control and data acquisition system is also upgraded in order to resolve and react on fast events, such as ELMs. A new optical arc detection system comes in reinforcement of the V{sub r}/V{sub f} and SHAD systems.

  1. Mechanical braking system for the pulsed power supply system of ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Käsemann, C.-P., E-mail: c.p.kaesemann@ipp.mpg.de [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Huart, M. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Michel Huart Personal Coaching and Consulting, Georgenschwaigstraße 23 RG, 80807 München (Germany); Stobbe, F.; Goldstein, I.; Sigalov, A. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Sachs, E. [Siemens AG, Industrial Automation Systems, Gleiwitzer Straße 555, 90475 Nürnberg (Germany); Perk, E. [Piper Test and Measurement Ltd., The Barn, Bilsington, Ashford, Kent TN25 7JT, England (United Kingdom)

    2013-10-15

    Highlights: ► Compact and innovative solution for dumping of large kinetic energy. ► Small mass of energy converter at the shaft due to circulating storage medium. ► Design of the active parts ensures flat torque/power characteristics. ► Also suitable for spending a great part of operating life in “Freewheeling” mode. -- Abstract: A few years ago, IPP reviewed the safety of the ASDEX Upgrade pulsed power supply system. Two critical sub-systems had been identified: The (electrical) braking system for the flywheel generators and the oil lubrication system for the shaft bearings. A simultaneous failure of these two systems may lead to severe damages and could have consequences for the safety of operating personnel. Therefore a second, independent braking possibility for every generator was stipulated. Especially the challenges adapting a dynamometer, originally designed for motor test benches, towards a plant safety system for generator EZ4 will be described in the paper. Further on, the paper will present the problems, implementing such a system into an existing installation, including the calculation of the required supporting structure, balancing of the extended shaft line and required water cooling and control. Finally it will report on the performance achieved during operation.

  2. Divertor power and particle fluxes between and during type-I ELMs in the ASDEX Upgrade

    Science.gov (United States)

    Kallenbach, A.; Dux, R.; Eich, T.; Fischer, R.; Giannone, L.; Harhausen, J.; Herrmann, A.; Müller, H. W.; Pautasso, G.; Wischmeier, M.; ASDEX Upgrade Team

    2008-08-01

    Particle, electric charge and power fluxes for type-I ELMy H-modes are measured in the divertor of the ASDEX Upgrade tokamak by triple Langmuir probes, shunts, infrared (IR) thermography and spectroscopy. The discharges are in the medium to high density range, resulting in predominantly convective edge localized modes (ELMs) with moderate fractional stored energy losses of 2% or below. Time resolved data over ELM cycles are obtained by coherent averaging of typically one hundred similar ELMs, spatial profiles from the flush-mounted Langmuir probes are obtained by strike point sweeps. The application of simple physics models is used to compare different diagnostics and to make consistency checks, e.g. the standard sheath model applied to the Langmuir probes yields power fluxes which are compared with the thermographic measurements. In between ELMs, Langmuir probe and thermography power loads appear consistent in the outer divertor, taking into account additional load due to radiation and charge exchange neutrals measured by thermography. The inner divertor is completely detached and no significant power flow by charged particles is measured. During ELMs, quite similar power flux profiles are found in the outer divertor by thermography and probes, albeit larger uncertainties in Langmuir probe evaluation during ELMs have to be taken into account. In the inner divertor, ELM power fluxes from thermography are a factor 10 larger than those derived from probes using the standard sheath model. This deviation is too large to be caused by deficiencies of probe analysis. The total ELM energy deposition from IR is about a factor 2 higher in the inner divertor compared with the outer divertor. Spectroscopic measurements suggest a quite moderate contribution of radiation to the target power load. Shunt measurements reveal a significant positive charge flow into the inner target during ELMs. The net number of elementary charges correlates well with the total core particle loss

  3. Research on real-time simulation test for upgrades of digital I and C system in nuclear power plant

    International Nuclear Information System (INIS)

    Shi Ji; Jiang Mingyu; Ma Yunqin

    2005-01-01

    The developing trend that digital instrument and control (I and C) system will supplant traditional analog I and C system in nuclear power plant is emphasized. This paper introduces mathematical model of steam generator of full scope simulator for nuclear power plant. The independent real-time simulation system, which forms the interactive closed loop together with the steam generator control system, can be applied to provide a simulation target for upgrades of instrument and control system and the research of control schemes. At the same time, a simulation method for this purpose is presented in this paper. In this method all of the hardware and software are composed of real distributed control system except the model of controlled object. This will not only create favorable conditions for commissioning on site in the future, but also give a theoretical analysis for upgrades of digital I and C system in nuclear power plant. (authors)

  4. RF Power Detector/Monitor Upgrade for the 500MHz Systems at the ALS

    International Nuclear Information System (INIS)

    Baptiste, K.

    2003-01-01

    Several systems rely on the accurate and linear detection of 500 MHz signals, (the fundamental frequency of both the Booster Ring and Storage Ring) over a dynamic range in excess of 25dB. Prior to this upgrade, the detector/monitor was diode based and though this type of detector could handle the dynamic range requirement it could not do so in an accurate and linear manner. In order to meet the requirements (dynamic range greater than or equal to 25dB, accurate and linear to +-0.25dB over the range, and additional circuitry to interface to the legacy control system and interlocks), a new RF Power Detector/Monitor has been developed using two AD8361, Analog Devices Tru RMS Detectors and a fuzzy comparator, which extends the overall detector's range to twice that of the AD8361. Further information is available [www.analogedevices.com/]. Details of the design requirements and the detector/monitor's circuit as well as the performance of the detector will be presented

  5. Optimized tokamak power exhaust with double radiative feedback in ASDEX Upgrade

    Science.gov (United States)

    Kallenbach, A.; Bernert, M.; Eich, T.; Fuchs, J. C.; Giannone, L.; Herrmann, A.; Schweinzer, J.; Treutterer, W.; the ASDEX Upgrade Team

    2012-12-01

    A double radiative feedback technique has been developed on the ASDEX Upgrade tokamak for optimization of power exhaust with a standard vertical target divertor. The main chamber radiation is measured in real time by a subset of three foil bolometer channels and controlled by argon injection in the outer midplane. The target heat flux is in addition controlled by nitrogen injection in the divertor private flux region using either a thermoelectric sensor or the scaled divertor radiation obtained by a bolometer channel in the outer divertor. No negative interference of the two radiation controllers has been observed so far. The combination of main chamber and divertor radiative cooling extends the operational space of a standard divertor configuration towards high values of P/R. Pheat/R = 14 MW m-1 has been achieved so far with nitrogen seeding alone as well as with combined N + Ar injection, with the time-averaged divertor peak heat flux below 5 MW m-2. Good plasma performance can be maintained under these conditions, namely H98(y,2) = 1 and βN = 3.

  6. Applying wind turbines and battery storage to defer Orcas Power and Light Company distribution circuit upgrades

    International Nuclear Information System (INIS)

    Zaininger, H.W.; Barnes, P.R.

    1997-03-01

    The purpose of this study is to conduct a detailed assessment of the Orcas Power and Light Company (OPALCO) system to determine the potential for deferring the costly upgrade of the 25-kV Lopez- Eastsound circuit, by the application of a MW-scale wind farm and battery storage facilities as appropriate. Local wind resource data has been collected over the past year and used to determine MW-scale wind farm performance. This hourly wind farm performance data is used with measured hourly Eastsound load data, and recent OPALCO distribution system expansion plans and cost projections in performing this detailed benefit-cost assessment. The OPALCO distribution circuit expansion project and assumptions are described. MW-scale wind farm performance results are given. The economic benefit-cost results for the wind farm and battery storage applications on the OPALCO system using OPALCO system design criteria and cost assumptions are reported. A recalculation is presented of the benefit-cost results for similar potential wind farm and battery storage applications on other utility systems with higher marginal energy and demand costs. Conclusions and recommendations are presented. costs. Conclusions and recommendations are presented

  7. Data backup security in cloud storage system

    OpenAIRE

    Атаян, Борис Геннадьевич; Национальный политехнический университет Армении; Багдасарян, Татевик Араевна; Национальный политехнический университет Армении

    2016-01-01

    Cloud backup system is proposed, which provides means for effective creation, secure storage and restore of backups inCloud. For data archiving new efficient SGBP file format is being used in the system, which is based on DEFLATE compressionalgorithm. Proposed format provides means for fast archive creation, which can contain significant amounts of data. Modernapproaches of backup archive protection are described in the paper. Also the SGBP format is compared to heavily used ZIP format(both Z...

  8. Development of a serial powering scheme and a versatile characterization system for the ATLAS pixel detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Filimonov, Viacheslav

    2017-08-15

    In order to increase the probability of new discoveries the LHC will be upgraded to the HL-LHC. The upgrade of the ATLAS detector is an essential part of this program. The entire ATLAS tracking system will be replaced by an all-silicon detector called Inner Tracker (ITk) which should be able to withstand the increased luminosity of 5 x 10{sup 34} cm{sup -2}s{sup -1}. The work presented in this thesis is focused on the ATLAS ITk pixel detector upgrade. Advanced silicon pixel detectors will be an essential part of the ITk pixel detector where they will be used for tracking and vertexing. Characterization of the pixel detectors is one of the required tasks for a successful ATLAS tracker upgrade. Therefore, the work presented in this thesis includes the development of a versatile and modular test system for advanced silicon pixel detectors for the HL-LHC. The performance of the system is verified. Single and quad FE-I4 modules functionalities are characterized with the developed system. The reduction of the material budget of the ATLAS ITk pixel detector is essential for a successful operation at high luminosity. Therefore, a low mass, efficient power distribution scheme to power detector modules (serial powering scheme) is investigated as well in the framework of this thesis. A serially powered pixel detector prototype is built with all the components that are needed for current distribution, data transmission, sensor biasing, bypassing and redundancy in order to prove the feasibility of implementing the serial powering scheme in the ITk. Detailed investigations of the electrical performance of the detector prototype equipped with FE-I4 quad modules are made with the help of the developed readout system.

  9. Development of a serial powering scheme and a versatile characterization system for the ATLAS pixel detector upgrade

    International Nuclear Information System (INIS)

    Filimonov, Viacheslav

    2017-08-01

    In order to increase the probability of new discoveries the LHC will be upgraded to the HL-LHC. The upgrade of the ATLAS detector is an essential part of this program. The entire ATLAS tracking system will be replaced by an all-silicon detector called Inner Tracker (ITk) which should be able to withstand the increased luminosity of 5 x 10 34 cm -2 s -1 . The work presented in this thesis is focused on the ATLAS ITk pixel detector upgrade. Advanced silicon pixel detectors will be an essential part of the ITk pixel detector where they will be used for tracking and vertexing. Characterization of the pixel detectors is one of the required tasks for a successful ATLAS tracker upgrade. Therefore, the work presented in this thesis includes the development of a versatile and modular test system for advanced silicon pixel detectors for the HL-LHC. The performance of the system is verified. Single and quad FE-I4 modules functionalities are characterized with the developed system. The reduction of the material budget of the ATLAS ITk pixel detector is essential for a successful operation at high luminosity. Therefore, a low mass, efficient power distribution scheme to power detector modules (serial powering scheme) is investigated as well in the framework of this thesis. A serially powered pixel detector prototype is built with all the components that are needed for current distribution, data transmission, sensor biasing, bypassing and redundancy in order to prove the feasibility of implementing the serial powering scheme in the ITk. Detailed investigations of the electrical performance of the detector prototype equipped with FE-I4 quad modules are made with the help of the developed readout system.

  10. First evidence for "The backup plan paradox".

    Science.gov (United States)

    Napolitano, Christopher M; Freund, Alexandra M

    2017-08-01

    This research is a first test of the backup plan paradox. We hypothesized that investing in a backup plan may facilitate the conditions that it was developed to address: Plan A's insufficiency. Five studies provide initial, primarily correlative support for the undermining effect of investing in a backup plan. Study 1 (n= 160) demonstrated that the more participants perceived they had invested in developing a backup plan (preparing a "crib sheet"), the more likely they were to use it, although greater investments were unrelated to backup plan utility. Studies 2-4 used a simulated negotiation task. Study 2 (n = 247) demonstrated that when goal-relevant resources are limited, investing in developing backup plans and perceiving them as highly instrumental can decrease goal performance through the indirect effect of increased means replacing. Study 3 (n = 248) replicated this effect when goal-relevant resources were plentiful. Study 4 (n = 204) used an experimental variant of the simulated negotiation task and demonstrated that simply having a backup plan is not detrimental, but perceiving backup plans to be highly instrumental decreased goal performance, again through the indirect effect of increased means replacing. Study 5 (n = 160) replicated findings from Studies 1-4 using a lab-based motor task (throwing a ball). Together, these results provide first evidence that backup plans can introduce costs that may jeopardize goal performance. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  11. Reliability and efficiency upgrades of power systems operation by implementing intelligent electronic devices with synchrophasor measurement technology support

    Directory of Open Access Journals (Sweden)

    Mokeev Alexey

    2017-01-01

    Full Text Available This paper reviews issues of reliability and efficiency upgrades of power systems functions by means of a widespread implementation of intelligent electronic devices (IED in various purposes supporting synchrophasor measurement technology. Thus, such issues as IED’s operational analysis in the conditions of electromagnetic and electromechanical transient processes and synthesis of digital filters that improve static and dynamic responses of these devices play an important role in their development.

  12. Reliability and efficiency upgrades of power systems operation by implementing intelligent electronic devices with synchrophasor measurement technology support

    OpenAIRE

    Mokeev Alexey

    2017-01-01

    This paper reviews issues of reliability and efficiency upgrades of power systems functions by means of a widespread implementation of intelligent electronic devices (IED) in various purposes supporting synchrophasor measurement technology. Thus, such issues as IED’s operational analysis in the conditions of electromagnetic and electromechanical transient processes and synthesis of digital filters that improve static and dynamic responses of these devices play an important role in their devel...

  13. Life extension, power upgrade, and return to service work for Pickering NGS and other PWR and CANDU plants

    International Nuclear Information System (INIS)

    Millman, J.; Idvorian, N.; Schneider, W.

    2002-01-01

    Work on life extension, power upgrade and return to service has been performed and is in progress for a number of PWR and CANDU plants. For PWR plants, power upgrade work has been done for the new replacement steam generators in several cases. This work consists of redoing the formal equipment qualification analysis and reports for the uprated operating conditions to support the application for license adjustment. Life extension assessments have been performed for several CANDU plants. These are highly detailed assessments in which the particular steam generator is reassessed part by part as to the ability of each to sustain full life operation and also extended life operation. Return to service work for Pickering NGSA specifically has included this type of assessment and also specific repair, cleaning and retrofit activities including secondary side inspection, waterlancing, divider plate repair, eddy current inspection, etc. Steam generator modifications and retrofit work have been performed in a number of cases. The paper discusses various life extension, power upgrade, equipment modification and return to service activities all of which are part of the renewed drive in the industry to realise the full potential of nuclear plants by getting more and better performance from the extended service of existing plants. (author)

  14. ITK optical links backup document

    CERN Document Server

    Huffman, B T; The ATLAS collaboration; Flick, T; Ye, J

    2013-01-01

    This document describes the proposed optical links to be used for the ITK in the phase II upgrade. The current R&D for optical links pursued in the Versatile Link group is reviewed. In particular the results demonstrating the radiation tolerance of all the on-detector components are documented. The bandwidth requirements and the resulting numerology are given.

  15. Karachi nuclear power plant - A review of performance, problems and upgrades

    International Nuclear Information System (INIS)

    Hussain, S.B.

    1998-01-01

    KANUPP during its 23 years of operation has experienced multiple challenges in keeping the plant operating and supplying safe and economical power to the Karachi grid. The biggest challenge was faced in 1976, when the original vendor imposed unilateral embargo leading to the stoppage of supplies of essential spare-parts, nuclear fuel, heavy water and technical support. This forced KANUPP to a net, way of operating the plant which necessarily had to be based on indigenous support. Obsolescence of C and I components became evident soon after plant went into commercial operation because of explosive development and advancement in the electronic and computer technology. KANUPP was, however, able to cope with the normal maintenance and improvement of its process, mechanical and electrical equipment till 80's. However, many of the critical components are now reaching the end of their designed life and developing chronic problems due to ageing. The only technically suitable and commercially viable alternative is the complete replacement of CC and I components. KANUPP has already undertaken this job alongwith other related work under ''Technological Upgradation Project''. In order to manage ageing related degradation and carry out full scale assessment of the health of reactor fuel channels KANUPP prepared an ''Integrated Safety Master Action Plan'' and submitted it to IAEA for arranging international assistance. After intense negotiations and with the IAEA's cooperation in May 1990, Canadian policy towards KANUPP was revised allowing it to provide assistance for Safe Operation of KANUPP (SOK) through the IAEA and only for the IAEA suggested remedial actions. Work under SOK is being carried out to: Combat ageing and obsolence Problems; Modernize Operational Safety practices; Improve safety systems design. This paper describes KANUPP's efforts in overcoming different problems mentioned above

  16. Thermal-hydraulic analysis of the OSURR pool for power upgrade with natural convection core cooling

    International Nuclear Information System (INIS)

    Ha, J.J.; Aldemir, T.

    1988-01-01

    Natural convection mode core cooling will be maintained in the LEU conversion/power upgrade of The Ohio State University Research Reactor (OSURR) to 250-500 kW. The pool water will be cooled by a water-glycol-air and a water-water heat exchanger. A plume disperser will be installed in the pool to minimize evaporation from the pool top and to maintain the dose rate due to N-16 activity within allowable levels. The minimization of the pool heat removal system operation costs necessitates maximizing the inlet temperature to the water-glycol-air heat exchanger. For the maximization process, the change in the pool temperature and velocity fields have to be investigated as a function of: location and orientation of the heat removal system components and the plume disperser in the pool; mass flow rate through the plume disperser. The velocity and temperature fields in the pool are determined using COMMIX-1A. The computational system model accounts for the presence of all the pool components (i.e. core, thermal column, beam ports, ion chamber, guide tubes, rabbit, neutron source etc.). The results show that: (1) Both the heat removal system inlet point and the plume disperser have to be located close to the top of the core. (2) Using a disperser system consisting of several pipes may be more feasible than a single unit. (3) For high disperser flow, the disperser jet has to be almost parallel to the top of the core to prevent flow reversal in coolant channels. (4) More than one disperser system may be necessary to create an inversion layer in the pool

  17. EMI environment EMC considerations concerning equipment upgrades at a nuclear utility power generating station a case history

    International Nuclear Information System (INIS)

    Metcalf, M.J.

    1993-01-01

    As equipment is upgraded during scheduled power outages in nuclear power generating stations, more and more utilities will be faced with the problem of dealing with Electromagnetic Compatibility (EMC) issues that have evolved with the trend of manufacturers designing equipment based around state-of-the-art high technology logic devices. This paper lists Commonwealth Edison Company (CECO) equipment that was scrutinized by National Technical Systems (NTS) for its EMI impact. The test requirements and test procedures for assessing EMI and EMC are outlined. Although on-site mapping data was gathered to assist CECO for the upgrade described here of the Auxiliary Electric Equipment Room of a Westinghouse Eagle 21 Reactor Protection System at the Zion Unit No.1 Station, blanket mapping of every location for every upgrade is a short term, expensive solution to the EMI problem. It is concluded that the primary problem of lack of system and component level EMI specifications must be addressed by a governing body. 7 refs., 2 figs

  18. Upgrade of a 30 kV/10 mA anode power supply for triode type gyrotron

    Energy Technology Data Exchange (ETDEWEB)

    Siravo, Ugo, E-mail: ugo.siravo@epfl.ch; Alberti, Stefano; Dubray, Jérémie; Fasel, Damien; Hogge, Jean-Philippe; Marlétaz, Blaise; Marmillod, Philippe; Perez, Albert; Silva, Miguel

    2015-10-15

    Highlights: • Triode type gyrotron is fed by 3 power supplies: the main, an anode PS(APS) and a heater. • This paper presents the upgrade of 3APS, supplied in 1999, that never fulfilled the specs. • The new working principle is very efficient, easy to implement, for a minimal cost. • Upgraded APS provides extended modulation capabilities, no overshoot and lowerripple. • This upgrade will allow exploring new operation regimes for the 3 TCV X3 gyrotrons. - The RF power of a gyrotron with a triode type magnetron-injection-gun (MIG) can be directly controlled via the voltage applied between its anode and its cathode. Hence, the performance of this type of gyrotron relies directly on the possibilities offered by the power supply controlling the anode to cathode voltage. For a system of gyrotrons connected to the same main high-voltage power supply, with a triode MIG one has the additional advantage of independently controlling each individual gyrotron. This paper presents the modifications brought to the three existing 30 kV/10 mA anode power supplies connected to the 500 kW/118 GHz/2s X3 gyrotrons operated on the TCV Tokamak. The new working principle based on phase-shift modulation (PSM) is described in detail. Experimental results obtained on dummy load are compared to simulations performed during the design phase. With respect to the initial working principle, the modulation frequency capability has been increased by a factor 10 reaching more than 5 kHz, whereas the output voltage ripple as well as the overshoot/undershoot have been significantly reduced.

  19. Backup flexibility classes in emerging large-scale renewable electricity systems

    International Nuclear Information System (INIS)

    Schlachtberger, D.P.; Becker, S.; Schramm, S.; Greiner, M.

    2016-01-01

    Highlights: • Flexible backup demand in a European wind and solar based power system is modelled. • Three flexibility classes are defined based on production and consumption timescales. • Seasonal backup capacities are shown to be only used below 50% renewable penetration. • Large-scale transmission between countries can reduce fast flexible capacities. - Abstract: High shares of intermittent renewable power generation in a European electricity system will require flexible backup power generation on the dominant diurnal, synoptic, and seasonal weather timescales. The same three timescales are already covered by today’s dispatchable electricity generation facilities, which are able to follow the typical load variations on the intra-day, intra-week, and seasonal timescales. This work aims to quantify the changing demand for those three backup flexibility classes in emerging large-scale electricity systems, as they transform from low to high shares of variable renewable power generation. A weather-driven modelling is used, which aggregates eight years of wind and solar power generation data as well as load data over Germany and Europe, and splits the backup system required to cover the residual load into three flexibility classes distinguished by their respective maximum rates of change of power output. This modelling shows that the slowly flexible backup system is dominant at low renewable shares, but its optimized capacity decreases and drops close to zero once the average renewable power generation exceeds 50% of the mean load. The medium flexible backup capacities increase for modest renewable shares, peak at around a 40% renewable share, and then continuously decrease to almost zero once the average renewable power generation becomes larger than 100% of the mean load. The dispatch capacity of the highly flexible backup system becomes dominant for renewable shares beyond 50%, and reach their maximum around a 70% renewable share. For renewable shares

  20. Comparison of Cloud backup performance and costs in Oracle database

    OpenAIRE

    Aljaž Zrnec; Dejan Lavbič

    2011-01-01

    Current practice of backing up data is based on using backup tapes and remote locations for storing data. Nowadays, with the advent of cloud computing a new concept of database backup emerges. The paper presents the possibility of making backup copies of data in the cloud. We are mainly focused on performance and economic issues of making backups in the cloud in comparison to traditional backups. We tested the performance and overall costs of making backup copies of data in Oracle database u...

  1. Multistage and multiobjective formulations of globally optimal upgradable expansions for electric power distribution systems

    Science.gov (United States)

    Vaziri Yazdi Pin, Mohammad

    Electric power distribution systems are the last high voltage link in the chain of production, transport, and delivery of the electric energy, the fundamental goals of which are to supply the users' demand safely, reliably, and economically. The number circuit miles traversed by distribution feeders in the form of visible overhead or imbedded underground lines, far exceed those of all other bulk transport circuitry in the transmission system. Development and expansion of the distribution systems, similar to other systems, is directly proportional to the growth in demand and requires careful planning. While growth of electric demand has recently slowed through efforts in the area of energy management, the need for a continued expansion seems inevitable for the near future. Distribution system and expansions are also independent of current issues facing both the suppliers and the consumers of electrical energy. For example, deregulation, as an attempt to promote competition by giving more choices to the consumers, while it will impact the suppliers' planning strategies, it cannot limit the demand growth or the system expansion in the global sense. Curiously, despite presence of technological advancements and a 40-year history of contributions in the area, many of the major utilities still relay on experience and resort to rudimentary techniques when planning expansions. A comprehensive literature review of the contributions and careful analyses of the proposed algorithms for distribution expansion, confirmed that the problem is a complex, multistage and multiobjective problem for which a practical solution remains to be developed. In this research, based on the 15-year experience of a utility engineer, the practical expansion problem has been clearly defined and the existing deficiencies in the previous work identified and analyzed. The expansion problem has been formulated as a multistage planning problem in line with a natural course of development and industry

  2. ObliviSync: Practical Oblivious File Backup and Synchronization

    OpenAIRE

    Aviv, Adam J.; Choi, Seung Geol; Mayberry, Travis; Roche, Daniel S.

    2016-01-01

    Oblivious RAM (ORAM) protocols are powerful techniques that hide a client's data as well as access patterns from untrusted service providers. We present an oblivious cloud storage system, ObliviSync, that specifically targets one of the most widely-used personal cloud storage paradigms: synchronization and backup services, popular examples of which are Dropbox, iCloud Drive, and Google Drive. This setting provides a unique opportunity because the above privacy properties can be achieved with ...

  3. Some aspects of digital I and C and digital human-system interface upgrades in nuclear power plants

    International Nuclear Information System (INIS)

    Mandic, D.

    2005-01-01

    Digital I and C technology introduces some new terms and new processes like software life cycle, process computer configuration control, digital human-system interface (HSI), software V and V (Verification and Validation), software common mode failure potential, software documentation, etc. Based on the experience from NEK, and other NPPs and published reports from other organizations, this paper sheds light on challenging tasks related to some aspects of the digital I and C upgrades and especially the NPP MCR/MCB HSI (Nuclear Power Plant Main Control Room / Main Control Board Human-System Interface) upgrade. The Ref. [1], EPRI Report TR-1008122 was used as a guidance to analyze original NEK MCR/MCB HSI design (1970s), to describe migration from the original MCR/MCB HSI design to the 2005 AS-BUILT status and to propose the authors vision for the key planning aspects for I and C upgrades and MCR modernization. This paper submits the justified proposal for the endpoint vision and the migration path applicable to NEK MCR/MCB HSI modernization, as well as some of the possible risks and lessons learned. (author)

  4. An Upgraded Front-End Switching Power Supply Design For the ATLAS TileCAL Detector of the LHC

    CERN Document Server

    Drake, Gary; The ATLAS collaboration

    2011-01-01

    We present the design of an upgraded switching power supply brick for the front-end electronics of the ATLAS hadron tile calorimeter (TileCAL) at the LHC. The new design features significant improvement in noise, improved fault detection, and generally a more robust design, while retaining the compact size, water-cooling, output control, and monitoring features in this 300 KHz design. We discuss the improvements to the design, and the radiation testing that we have done to qualify the design. We also present our plans for the production of 2400 new bricks for installation on the detector in 2013.

  5. An Upgraded Front-End Switching Power Supply Design for the ATLAS TileCAL Detector of the LHC

    CERN Document Server

    Drake, G; The ATLAS collaboration; De Lurgio, P; Henriques, A; Minashvili, I; Nemecek, S; Price, L; Proudfoot, J; Stanek, R

    2011-01-01

    We present the design of an upgraded switching power supply brick for the front-end electronics of the ATLAS hadron tile calorimeter (TileCAL) at the LHC. The new design features significant improvement in noise, improved fault detection, and generally a more robust design, while retaining the compact size, water-cooling, output control, and monitoring features in this 300 KHz design. We discuss the improvements to the design, and the radiation testing that we have done to qualify the design. We also present our plans for the production of 2400 new bricks for installation on the detector in 2013.

  6. Applying secret sharing for HIS backup exchange.

    Science.gov (United States)

    Kuroda, Tomohiro; Kimura, Eizen; Matsumura, Yasushi; Yamashita, Yoshinori; Hiramatsu, Haruhiko; Kume, Naoto; Sato, Atsushi

    2013-01-01

    To secure business continuity is indispensable for hospitals to fulfill its social responsibility under disasters. Although to back up the data of the hospital information system (HIS) at multiple remote sites is a key strategy of business continuity plan (BCP), the requirements to treat privacy sensitive data jack up the cost for the backup. The secret sharing is a method to split an original secret message up so that each individual piece is meaningless, but putting sufficient number of pieces together to reveal the original message. The secret sharing method eases us to exchange HIS backups between multiple hospitals. This paper evaluated the feasibility of the commercial secret sharing solution for HIS backup through several simulations. The result shows that the commercial solution is feasible to realize reasonable HIS backup exchange platform when template of contract between participating hospitals is ready.

  7. The Belgian experience on the backfitting and safety upgrading of old operating nuclear power plants

    International Nuclear Information System (INIS)

    Brognon, T.

    1993-01-01

    The paper describes the methodology for backfitting and safety upgrading during the reevaluation of the Belgian NPP's: first generation (Doel-1, Doel-2, Tihange-1) and second generation plants (Doel-3, Doel-4, Tihange-2 and Tihange-3). A list of essential safety subjects and topics is given. The experience has proved the feasibility of a safety upgrading of operating NPP without injury to its availability, the benefit of a close cooperation between owner, engineering company and safety authorities throughout the project. A global approach to solving numerous specific deficiencies along with the optimization of the investments regarding the safety improvement of the NPP is suggested. Further increase of the know-how will be achieved through the present Belgian programme along with similar activities abroad. (R.I.)

  8. Upgrade of the main ring magnet power supply for the KEK 12GeV proton synchrotron

    International Nuclear Information System (INIS)

    Sato, H.; Sueno, T.; Toyama, T.; Mikawa, M.; Toda, T.; Matsumoto, S.

    1991-01-01

    In order to use the slow extracted beam of the PS more effectively, the period of slow extraction has been extended. In this paper, upgrade of the main ring magnet power supply is described. The main power supply consists of thyrister rectifiers, DC filters, reactive power compensators, AC harmonic filters and control systems. To increase the current capacity during flat top, the rectifiers and transformers were improved. AC network and DC filter were remained as it is, since the acceleration and deceleration times were not varied. Analog control devices and the computer control software have also been improved to realize a 2 sec flat top with a 4 sec repetition rate compared with the former 0.6sec flat top with a 2.5 sec repetition rate

  9. A new slip stacking RF system for a twofold power upgrade of Fermilab's Accelerator Complex

    Energy Technology Data Exchange (ETDEWEB)

    Madrak, Robyn [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2014-05-15

    Fermilab's Accelerator Complex has been recently upgraded, in order to increase the 120 GeV proton beam power on target from about 400 kW to over 700 kW for NOvA and other future intensity frontier experiments. One of the key ingredients of the upgrade is the offloading of some Main Injector synchrotron operations - beam injection and RF manipulation called ''slip stacking'' - to the 8GeV Recycler Ring, which had until recently been used only for low-intensity antiproton storage and cooling. This required construction of two new 53 MHz RF systems for the slip-stacking manipulations. The cavities operate simultaneously at Vpeak ≲150 kV, but at slightly different frequencies (Δf=1260 Hz). Their installation was completed in September 2013. This article describes the novel solutions used in the design of the new cavities, their tuning system, and the associated high power RF system. First results showing effective operation of the RF system, beam capture and successful slip-stacking in the Recycler Ring are presented.

  10. Maintenance procedure upgrade programs

    International Nuclear Information System (INIS)

    Campbell, J.J.; Zimmerman, C.M.

    1988-01-01

    This paper describes a systematic approach to upgrading nuclear power plant maintenance procedures. The approach consists of four phases: diagnosis, program planning, program implementation, and program evaluation. Each phase is explained as a series of steps to ensure that all factors in a procedure upgrade program are considered

  11. Seismic assessment and upgrading of nuclear power plants in Eastern Europe

    Energy Technology Data Exchange (ETDEWEB)

    Katona, T; Kostov, M

    1997-03-01

    The basic findings of the seismic re-qualification programmes going on recently at all VVER plants in Eastern Europe can be summarised. The problems of the seismic safety have to be solved taking into account the general concept of the nuclear safety enhancement of the units. There are cases where the system improvements lead to better and more effective solution of the problem than the structural upgrading. The equipment and piping of the primary system have sufficient capacity. The viscous dampers are considered usually for the upgrading. The equipment anchorage especially the electrical and I and C equipment anchorage have to be upgraded. There are general consideration for replacement of the hydraulic snubbers by viscous dampers in the primary circuit of the VVER 440/V230. The considerations are not only because of the better seismic behaviour but mainly because of the better operational performance. There is relatively good seismic instrumentation at the plants considered. The definition of the scram level of the units not designed for an OBE is an essential problem. More effort needed for the definition of this level on the basis of re-evaluation experience of the plant equipment and after the proper definition of post-earthquake activities. The seismic re-evaluation and re-qualification of the VVER units is a general safety issue in Easter European countries. This rather complex problem can be solved adopting the experience, methods and requirements of western countries and taking into account the design features of the VVER units as well as the as built and as it is conditions. (J.P.N.)

  12. Seismic assessment and upgrading of nuclear power plants in Eastern Europe

    International Nuclear Information System (INIS)

    Katona, T.; Kostov, M.

    1997-01-01

    The basic findings of the seismic re-qualification programmes going on recently at all VVER plants in Eastern Europe can be summarised. The problems of the seismic safety have to be solved taking into account the general concept of the nuclear safety enhancement of the units. There are cases where the system improvements lead to better and more effective solution of the problem than the structural upgrading. The equipment and piping of the primary system have sufficient capacity. The viscous dampers are considered usually for the upgrading. The equipment anchorage especially the electrical and I and C equipment anchorage have to be upgraded. There are general consideration for replacement of the hydraulic snubbers by viscous dampers in the primary circuit of the VVER 440/V230. The considerations are not only because of the better seismic behaviour but mainly because of the better operational performance. There is relatively good seismic instrumentation at the plants considered. The definition of the scram level of the units not designed for an OBE is an essential problem. More effort needed for the definition of this level on the basis of re-evaluation experience of the plant equipment and after the proper definition of post-earthquake activities. The seismic re-evaluation and re-qualification of the VVER units is a general safety issue in Easter European countries. This rather complex problem can be solved adopting the experience, methods and requirements of western countries and taking into account the design features of the VVER units as well as the as built and as it is conditions. (J.P.N.)

  13. Electrical and mechanical adaptation of commercially available power inverter modules for BUSSARD – The power supply of ASDEX Upgrade in vessel saddle coils

    Energy Technology Data Exchange (ETDEWEB)

    Rott, Michael, E-mail: Michael.Rott@ipp.mpg.de [Max Planck Institute for Plasma Physics, Boltzmannstrasse 2, D-85748 Garching (Germany); Arden, Nils; Eixenberger, Horst [Max Planck Institute for Plasma Physics, Boltzmannstrasse 2, D-85748 Garching (Germany); Klädtke, Kevin [Technical University Munich, Arcisstraße 21, D-80333 München (Germany); Teschke, Markus; Suttrop, Wolfgang [Max Planck Institute for Plasma Physics, Boltzmannstrasse 2, D-85748 Garching (Germany)

    2015-10-15

    Highlights: • Mechanical design of inverters for restricted space and good mountability. • Supply of DC link possible with thyristor converter. • Plant safety by independent overcurrent protections and a commercially arc detection system. • Ground fault detection by fast differential current measurement. • Possibilities of changing the inductance of a two windings iron core choke. - Abstract: To supply the ASDEX Upgrade's B-coils with AC current up to 1.3 kA{sub p} at 500 Hz with arbitrary waveforms, a set of 16 inverters has been designed and partially built. To keep cost and development time low, commercially available power modules are used and existing current converters feed the DC links. Three power modules are mounted in one cubicle for realizing a three level neutral point clamped (NPC) topology with lowest possible inductivity and making the most of the limited space available. The paper presents the effort and steps required to adapt standard power blocks towards the needs of the ASDEX Upgrade power supply as well as the mechanical optimizations for good mountability, flexibility and scalability. Besides, solutions for mandatory personnel safety and plant safety are presented.

  14. Electrical and mechanical adaptation of commercially available power inverter modules for BUSSARD – The power supply of ASDEX Upgrade in vessel saddle coils

    International Nuclear Information System (INIS)

    Rott, Michael; Arden, Nils; Eixenberger, Horst; Klädtke, Kevin; Teschke, Markus; Suttrop, Wolfgang

    2015-01-01

    Highlights: • Mechanical design of inverters for restricted space and good mountability. • Supply of DC link possible with thyristor converter. • Plant safety by independent overcurrent protections and a commercially arc detection system. • Ground fault detection by fast differential current measurement. • Possibilities of changing the inductance of a two windings iron core choke. - Abstract: To supply the ASDEX Upgrade's B-coils with AC current up to 1.3 kA_p at 500 Hz with arbitrary waveforms, a set of 16 inverters has been designed and partially built. To keep cost and development time low, commercially available power modules are used and existing current converters feed the DC links. Three power modules are mounted in one cubicle for realizing a three level neutral point clamped (NPC) topology with lowest possible inductivity and making the most of the limited space available. The paper presents the effort and steps required to adapt standard power blocks towards the needs of the ASDEX Upgrade power supply as well as the mechanical optimizations for good mountability, flexibility and scalability. Besides, solutions for mandatory personnel safety and plant safety are presented.

  15. Upgrading security at nuclear power plants: effect on utility operations and costs

    International Nuclear Information System (INIS)

    Salvesen, R.S.

    1977-01-01

    The impact of the new security regulation on Salem Unit No. 1 is discussed. The upgrading of security requirements in 10CFR 73.55 did not alter the basic elements of a security plan established in ANSI 18.17, but rather upgraded the level of the threat to which a security plan must respond. Its basic thrust is first to require a hardening of physical barriers and/or increase the security organization response capability to better neutralize a threat from the outside. Secondly, to implement more extensive search requirements to reduce the threat from inside by preventing the entry of unauthorized material that might be used for sabotage. Thirdly, it requires a reevaluation of security organization responsibilities and preplanning for contingencies to assure effective coordination of all involved parties. The new regulations impact most significantly on two of the five elements of a basic security plan--Physical Barriers and the Security Force and to some extent on administrative controls. At this time, I cannot accurately estimate the cost increase but would guess it will be double or triple our initial costs. There will be reduced productivity to some extent in stores and material handling activities and some impediment to all employees who must pass access control points, however, its overall affect on operating a its overall affect on operating activities should not be significant

  16. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  17. Utilization of surplus electricity from wind power for dynamic biogas upgrading

    DEFF Research Database (Denmark)

    Jurgensen, Lars; Ehimen, Ehiazesebhor Augustine; Born, Jens

    2014-01-01

    The methanation of CO2 has been increasingly discussed for the potential long term storage of electricity and for facilitating grid load management. Using the regions of northern Germany as a case study, the feasibility of CO2 conversion from biogas plants and its integration in existing natural...... gas grid was examined in this study. Furthermore the material and energy flows of in the methanation process, were evaluated to provide expression for the quantities of excess electrical energy which could be potentially stored using the biogas integrated systems. The study results showed...... that with 480 biogas plants in the region would be able to utilize up to 0.7 TWh surplus electricity could be used to produce 100 106 m3 at standard temperature and pressure of upgraded methane per year....

  18. Coal upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Nunes, S. [IEA Clean Coal Centre, London (United Kingdom)

    2009-10-15

    This report examines current technologies and those likely to be used to produce cleaner coal and coal products, principally for use in power generation and metallurgical applications. Consideration is also given to coal production in the leading coal producing countries, both with developed and developing industries. A range of technologies are considered. These include the coal-based liquid fuel called coal water mixture (CWM) that may compete with diesel, the production of ultra-clean coal (UCC) and coal liquefaction which competes with oil and its products. Technologies for upgrading coal are considered, especially for low rank coals (LRC), since these have the potential to fill the gap generated by the increasing demand for coal that cannot be met by higher quality coals. Potential advantages and downsides of coal upgrading are outlined. Taking into account the environmental benefits of reduced pollution achieved through cleaner coal and reduced transport costs, as well as other positive aspects such as a predictable product leading to better boiler design, the advantages appear to be significant. The drying of low rank coals improves the energy productively released during combustion and may also be used as an adjunct or as part of other coal processing procedures. Coal washing technologies vary in different countries and the implications of this are outlined. Dry separation technologies, such as dry jigging and electrostatic separation, are also described. The demonstration of new technologies is key to their further development and demonstrations of various clean coal technologies are considered. A number of approaches to briquetting and pelletising are available and their use varies from country to country. Finally, developments in upgrading low rank coals are described in the leading coal producing countries. This is an area that is developing rapidly and in which there are significant corporate and state players. 81 refs., 32 figs., 3 tabs.

  19. Cost-effective instrumentation and control upgrades for commercial nuclear power plants surety principles developed at Sandia National Laboratories

    International Nuclear Information System (INIS)

    Rochau, G.E.; Dalton, L.J.

    1998-01-01

    Many nuclear power plants use instrument and control systems based on analog electronics. The state of the art in process control and instrumentation has advanced to use digital electronics and incorporate advanced technology. This technology includes: distributed microprocessors, fiber optics, intelligent systems (neutral networks), and advanced displays. The technology is used to optimize processes and enhance the man-machine interface while maintaining control and safety of the processes. Nuclear power plant operators have been hesitant to install this technology because of the cost and uncertainty in the regulatory process. This technology can be directly applied in an operating nuclear power plant provided a surety principle-based 'administrator' hardware system is included in parallel with the upgrade. Sandia National Laboratories has developed a rigorous approach to High Consequence System Surety (HCSS). This approach addresses the key issues of safety, security, and control while satisfying requirements for reliability and quality. We believe that HCSS principles can be applied to nuclear power plants in a manner that allows the off-the-shelf use of process control instrumentation while maintaining a high level of safety and enhancing the plant performance. We propose that an HCSS Administrator be constructed as a standardized approach to address regulatory issues. Such an administrator would allow a plant control system to be constructed with commercially available, state-to-the-art equipment and be customized to the needs of the individual plant operator. (author)

  20. Cost-effective instrumentation and control upgrades for commercial nuclear power plants using surety principles developed at Sandia National Laboratories

    International Nuclear Information System (INIS)

    Rochau, G.E.; Dalton, L.J.

    1997-01-01

    Many nuclear power plants use instrument and control systems based on analog electronics. The state of the art in process control and instrumentation has advanced to use digital electronics and incorporate advanced technology. This technology includes distributed microprocessors, fiber optics, intelligent systems (neural networks), and advanced displays. The technology is used to optimize processes and enhance the man-machine interface while maintaining control and safety of the processes. Nuclear power plant operators have been hesitant to install this technology because of the cost and uncertainty in the regulatory process. This technology can be directly applied in an operating nuclear power plant provided a surety principle-based open-quotes administratorclose quotes hardware system is included in parallel with the upgrade Sandia National Laboratories has developed a rigorous approach to High Consequence System Surety (HCSS). This approach addresses the key issues of safety, security, and control while satisfying requirements for reliability and quality. HCSS principles can be applied to nuclear power plants in a manner that allows the off-the-shelf use of process control instrumentation while maintaining a high level of safety and enhancing the plant performance. We propose that an HCSS administrator be constructed as a standardized approach to address regulatory issues. Such an administrator would allow a plant control system to be constructed with commercially available, state-of-the-art equipment and be customized to the needs of the individual plant operator

  1. Effects of upgrading systems on energy conversion efficiency of a gasifier - fuel cell - gas turbine power plant

    International Nuclear Information System (INIS)

    Pedrazzi, Simone; Allesina, Giulio; Tartarini, Paolo

    2016-01-01

    Highlights: • An advanced gasifier-SOFC-MGT system is modeled. • An overall electrical efficiency of 32.81% is reached. • Influence of all the sub-system modeled on the power plant efficiency is discussed. • Compression storage of syngas is taken into account. - Abstract: This work focuses on a DG-SOFC-MGT (downdraft gasifier - solid oxide fuel cell - micro gas turbine) power plant for electrical energy production and investigates two possible performance-upgrading systems: polyphenylene oxide (PPO) membrane and zeolite filters. The first is used to produce oxygen-enriched air used in the reactor, while the latter separates the CO_2 content from the syngas. In order to prevent power plant shutdowns during the gasifier reactor scheduled maintenance, the system is equipped with a gas storage tank. The generation unit consists of a SOFC-MGT system characterized by higher electrical efficiency when compared to conventional power production technology (IC engines, ORC and EFGT). Poplar wood chips with 10% of total moisture are used as feedstock. Four different combinations with and without PPO and zeolite filtrations are simulated and discussed. One-year energy and power simulation were used as basis for comparison between all the cases analyzed. The modeling of the gasification reactions gives results consistent with literature about oxygen-enriched processes. Results showed that the highest electrical efficiency obtained is 32.81%. This value is reached by the power plant equipped only with PPO membrane filtration. Contrary to the PPO filtering, zeolite filtration does not increase the SOFC-MGT unit performance while it affects the energy balance with high auxiliary electrical consumption. This solution can be considered valuable only for future work coupling a CO_2 sequestration system to the power plant.

  2. Upgrade of the MAGIC telescopes single wavelength micro power LIDAR system

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Dominik [Max-Planck-Institut fuer Physik, Muenchen (Germany); Collaboration: MAGIC-Collaboration

    2016-07-01

    Since 2011 a single wavelength LIDAR system is operated alongside the observations of the MAGIC telescopes. It is used for real-time monitoring of the atmospheric transmission and for detecting cloud layers within the field of view of MAGIC. The system uses a pulsed Nd:YAG laser with 532 nm wavelength and a pulse energy of 5 μJ as transmitter. The receiver is mounted to a 60 cm spherical single mirror telescope with a F/D ratio of 2.5. To compensate for the low light intensities a sensitive detector with the capability of single photon detection as well as charge integration is needed. For this purpose, a hybrid photo diode with a peak quantum efficiency of 55% an a pulse width of 2.5ns is used in a custom designed detector. The analog signal is recorded by a computer mounted 8-bit FADC with 200 MS/s. A signal analysis algorithm converts the LIDAR return signal into a number of single photoelectron counts per range bin. The atmospheric transmission is calculated by fitting a Rayleigh back-scattering model with a sliding window. The resulting transmission profile is used to correct the MAGIC gamma ray data for adverse weather conditions. After five years of data taking the MAGIC LIDAR system is upgraded with a stronger laser and a new detector unit in order to extend the measurement range and to optimize the operation.

  3. Bayes-Based Fault Discrimination in Wide Area Backup Protection

    Directory of Open Access Journals (Sweden)

    WANG, Z.

    2012-02-01

    Full Text Available Multivariate statistical analysis is an effective tool to finish the fault location for electric power system. In Bayesian discriminant analysis as a subbranch, by the research of several populations, one can calculate the conditional probability that some samples belong to these populations, and compare the corresponding probability. The sample will be classified as population with maximum probability. In this paper, based on Bayesian discriminant analysis principle, a great number of simulation examples have confirmed that the results of Bayesian fault discriminant in wide area backup protection are accurate and reliable.

  4. Interpretation of the effects of electron cyclotron power absorption in pre-disruptive tokamak discharges in ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.; Lazzaro, E.; Granucci, G. [Associazione Euratom-CNR sulla Fusione, IFP-CNR, Via R. Cozzi 53, 20125 Milano (Italy); Esposito, B. [Associazione Euratom-CNR sulla Fusione, CR Frascati, C.P. 65, 00044 Frascati (Italy); Maraschek, M.; Zohm, H. [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, Boltzmannstr.2, 85748 Garching bei Munchen (Germany); Sauter, O.; Brunetti, D. [CRPP, Association Euratom-Confederation Suisse, EPFL, 1015 Lausanne (Switzerland); Collaboration: ASDEX Upgrade Team

    2012-09-15

    Tokamak disruptions are events of fatal collapse of the magnetohydrodynamic (MHD) confinement configuration, which cause a rapid loss of the plasma thermal energy and the impulsive release of magnetic energy and heat on the tokamak first wall components. The physics of the disruptions is very complex and non-linear, strictly associated with the dynamics of magnetic tearing perturbations. The crucial problem of the response to the effects of localized heat deposition and current driven by external (rf) sources to avoid or quench the MHD tearing instabilities has been investigated both experimentally and theoretically on the ASDEX Upgrade tokamak. The analysis of the conditions under which a disruption can be prevented by injection of electron cyclotron (EC) rf power, or, alternatively, may be caused by it, shows that the local EC heating can be more significant than EC current drive in ensuring neoclassical tearing modes (NTMs) stability, due to two main reasons: first, the drop of temperature associated with the island thermal short circuit tends to reduce the neoclassical character of the instability and to limit the EC current drive generation; second, the different effects on the mode evolution of both the location of the power deposition relative to the island separatrix and the island shape deformation lead to less strict requirements of precise power deposition focussing. A contribution to the validation of theoretical models of the events associated with NTM is given and can be used to develop concepts for their control, relevant also for ITER-like scenarios.

  5. A DC-DC Conversion Powering Scheme for the CMS Phase-1 Pixel Upgrade

    CERN Document Server

    Feld, Lutz Werner; Marcel Friedrichs; Richard Hensch; Karpinski, Waclaw; Klein, Katja; Sammet, Jan Domenik; Wlochal, Michael

    2012-01-01

    The powering scheme of the CMS pixel detector will be described, and the performance of prototype DC-DC buck converters will be presented, including power efficiency, system tests with DC-DC converters and pixel modules, thermal management, reliability at low temperature, and studies of potential frequency locking betwe...

  6. Development of a DC-DC conversion powering scheme for the CMS Phase-1 pixel upgrade

    CERN Document Server

    Feld, Lutz Werner; Karpinski, Waclaw; Klein, Katja; Lipinski, Martin; Preuten, Marius; Max Rauch; Rittich, David Michael; Sammet, Jan Domenik; Wlochal, Michael

    2014-01-01

    A novel powering scheme based on the DC-DC conversion technique will be exploited to power the CMS Phase-1 pixel detector. DC-DC buck converters for the CMS pixel project have been developed, based on the AMIS5 ASIC designed by CERN. The powering system of the Phase-1 pixel detector is described and the performance of the converter prototypes is detailed, including power efficiency, stability of the output voltage, shielding, and thermal management. Results from a test of the magnetic field tolerance of the DC-DC converters are reported. System tests with pixel modules using many components of the future pixel barrel system are summarized. Finally first impressions from a pre-series of 200 DC-DC converters are presented.

  7. Upgrading of fire protection arrangements at Magnox power stations in the United Kingdom

    International Nuclear Information System (INIS)

    Zhu, L.H.

    1998-01-01

    The methodology used in conducting fire hazard assessments at Magnox Reactor power stations operated by Magnox Electric plc is described. The assessments use a deterministic approach. This includes the identification of essential plant and the associated supporting systems required for the safe trip, shutdown and post-trip cooling of the reactor, assessment of the location of the essential plant and the vulnerability of these plant in the presence of a fire, assessment of essential functions against the effects of a fire and identification of improvements to the fire protection arrangements. Practical aspects of fire protection engineering on operating power stations are discussed and examples of improvements in protection described. (author)

  8. Developing Major Steps for a Feasibility Study for Upgrading I and C Systems in a Large Scale for an Operating Nuclear Power Plant

    International Nuclear Information System (INIS)

    Suh, Yong Suk; Keum, Jong Yong; Kim, Dong Hoon; Kang, Hyeon Tae; Sung, Chan Ho; Lee, Jae Ki; Cho, Chang Hwan

    2009-01-01

    According to the IAEA report as of Jan. 2008, 436 nuclear power reactors are in operation over the world and 368 nuclear power reactors exceed their operating ages by 20 years. The average I and C equipment's life span is 20 years comparing with that the average reactor's life time is 40 to 60 years. This means that a reactor must be faced with I and C equipment obsolescence problems once or twice during its operating years. The I and C equipment is replaced with new equipment only when the obsolescence problem occurs in a nuclear power plant. This is called an equipment basis upgrade in this paper. This replacement is such a general practice that occurs only when needed. We can assume that most of I and C equipment of a plant will meet with the obsolescence problem almost same time since it started operating. Although there must be a little time difference in the occurrence of the problems among I and C equipment, the replacement will be required in consecutive years. With this assumption, it is recommendable to upgrade the equipment, which is to meet with the problem at the same time, with new equipment at the same time. This is called a system basis upgrade in this paper. The system-basis replacement can be achieved in a large scale by coupling systems whose functions are related each other and replacing them together with a new upto- date platform. This paper focuses on the large scale upgrade of I and C systems for existing and operating NPPs. While performing a feasibility study for the large scale upgrade for Korea standard nuclear power plants (KSNPs), six major steps are developed for the study. This paper is to present what to perform in each step

  9. Density dependence of SOL power width in ASDEX upgrade L-Mode

    Directory of Open Access Journals (Sweden)

    B. Sieglin

    2017-08-01

    A recent study [4] with an open divertor configuration found an asymmetry of the power fall-off length between inner and outer target with a smaller power fall-off length λq,i on the inner divertor target. Measurements with a closed divertor configuration find a similar asymmetry for low recycling divertor conditions. It is found, in the experiment, that the in/out asymmetry λq,i/λq,o is strongly increasing with increasing density. Most notably the heat flux density at the inner divertor target is reducing with increasing λq,i whilst the total power onto each divertor target stays constant. It is found that λq,o exhibits no significant density dependence for hydrogen and deuterium but increases with about the square root of the electron density for helium. The difference between H,D and He could be due to the different recycling behaviour in the divertor. These findings may help current modelling attempts to parametrize the density dependence of the widening of the power channel and thus allow for detailed comparison to both divertor effects like recycling or increased upstream SOL cross field transport.

  10. Upgrade of the NCSU PULSTAR instrumentation power channels. Final technical report, September 1, 1992 - August 31, 1994

    International Nuclear Information System (INIS)

    Perez, P.B.

    1998-01-01

    The Nuclear Reactor Program at North Carolina State University initiated an upgrade program at the NCSU PULSTAR Reactor in 1990. The originally supplied instrumentation has been replaced with solid-state and current technology equipment. The financial assistance from the US Department of Energy has been the primary source of support. This is the final report for the Instrumentation Upgrade

  11. Gradual instrumentation and control upgrades in U.S. nuclear power plants

    International Nuclear Information System (INIS)

    Welk, S.

    1997-01-01

    Since the late 1980s, US nuclear power plants have been struggling with the technical and licensing realities associated with installing digital protection and control systems into existing facilities. The industry, regulators and equipment vendors are finally reaching agreements regarding acceptable practices and requirements. The present paper explains the philosophy for gradual instrumentation and control replacements being pursued and the technical issues being addressed. It also describes some of the future challenges facing the industry. (author)

  12. License renewal and power upgrade of the Cornell University TRIGA reactor

    International Nuclear Information System (INIS)

    Aderhold, Howard C.

    1984-01-01

    The Cornell Mark II TRIGA reactor has been a principal facility for instruction and research in nuclear science and engineering at Cornell, and it has been extensively used by other departments at Cornell and by nearby universities and industries. Initially the fuel was low hydride, 8.5w/o 19%-enriched, aluminum clad; in 1974 it was changed to high-hydride, stainless-steel-clad. The maximum power has been 100 kW, with pulses to $2, and operation has been on a one-shift demand basis. Annual energy generation of 50 MWH has been typical. Standard features include a 4-inch tangential port and our 6-inch radial ports, a thermal column with hohlraum and vertical access, a central thimble, a 'rabbit', and a set of dry irradiation tubes, replacing the 'Lazy Susan'. The license was renewed and amended in November 1983; the new limits are 500 kW and $3 pulses. Physical changes to the facility included addition of a water-to-water heat exchanger and of a diffuser at the water outlet ∼ 60 cm above the core. The flow rate is 300 liters per minute in the primary (reactor) side of the heat exchanger. The temperature of the chilled water entering the secondary of the exchanger is ∼ 12?C; its flow rate is adjusted by a servo-controlled by-pass valve to maintain the desired range of pool water temperature. Steps taken to go to higher power included rearrangement of fuel elements to increase excess reactivity, recalibration of control rods, and power vs ion chamber current calibrations at successively higher power by comparing the rate of rise of pool temperature with a known rate using electrical heating elements. Steady-state operation has been done up to 480 kW (nominal) but pulsing at the newly allowed higher levels has not been tested as yet

  13. Upgrade of Control and Protection System of the Ignalina Nuclear Power Plant Units 1 and 2

    International Nuclear Information System (INIS)

    Wright, Ronald E.; Fletcher, Norman; Sidnev, Victor E.; Bickel, John H.; Vianello, Aldo; Pearsall, Raymond D.

    2003-01-01

    The Ignalina nuclear power plant (NPP) Units 1 and 2 are Soviet-designed, RBMK (Reaktor Bolshoi Moschnosti Kipyashchiy), channelized, large power-type reactors. The original-design electrical capacity for each unit was 1500 MW. Unit 1 began operating in 1983, and Unit 2 was started up in 1987. In 1994, the government of Lithuania agreed to accept grant support for the Ignalina NPP Safety Improvement Program with funding supplied by the Nuclear Safety Account of the European Bank for Reconstruction and Development (EBRD). As conditions for receiving this funding, the Ignalina NPP agreed to prepare a comprehensive safety analysis report that would undergo independent peer review after it was issued. The EBRD Safety Panel oversaw preparation and review of the report. In 1996, the safety analysis report for Unit 1 was completed and delivered to the EBRD. Part of the analyses covered anticipated transients without scram (ATWS). The analysis showed that some ATWS scenarios could lead to unacceptable consequences in <1 min. The EBRD Safety Panel recommended to the government of Lithuania that the Ignalina NPP develop and implement a program of compensatory measures for the control and protection system before the unit would be allowed to return to operation following its 1998 maintenance outage. A compensatory control and protection system that would mitigate the unacceptable consequences was designed, procured, manufactured, tested, and installed. The project was funded by U.S. Department of Energy

  14. Upgrading the Reactor Power Control Concept with a Modern Digital Control System

    International Nuclear Information System (INIS)

    Laengle, M.; Schildheuer, R.

    2011-01-01

    Within the framework of a retrofit project, a reactor power instrumentation and control system (REALL) - consisting of a limiting system and the respective reactor control systems - was retrofitted and modernized in a 1450-MW-nuclear-power-plant in Baden-Wuerttemberg. The REALL process control functions were implemented within a modern and completely digitized control system that has been designed for use in safety I and C applications. Along with the installation of the digital control system, the associated hardware was adapted to today's state of the art. At the same time, the given potential for improvement, as revealed during the plant's operation so far, was taken into account in the programming. In order to provide for transparent and quality-assured project management, the implementation was based on a stage plan consisting of several steps, along with specific milestones. Final commissioning of the modern digital control system took place during the 2008 plant overhaul. Despite the complex commissioning procedure, it was possible to avoid a major prolongation of the plant's downtime and to keep within a rough 4-week timeframe that had originally been defined for the plant overhaul to adequate structuring of the project, goal-oriented implementation of preparatory infrastructural measures and adequate scheduling of the coordinated activities of the installation and commissioning teams entrusted with the commissioning of the digital control system during the overhaul activities. (author)

  15. Enterprise systems backup and recovery a corporate insurance policy

    CERN Document Server

    de Guise, Preston

    2008-01-01

    The success of information backup systems does not rest on IT administrators alone. Rather, a well-designed backup system comes about only when several key factors coalesce-business involvement, IT acceptance, best practice designs, enterprise software, and reliable hardware. Enterprise Systems Backup and Recovery: A Corporate Insurance Policy provides organizations with a comprehensive understanding of the principles and features involved in effective enterprise backups.Instead of focusing on any individual backup product, this book recommends corporate procedures and policies that need to be established for comprehensive data protection. It provides relevant information to any organization, regardless of which operating systems or applications are deployed, what backup system is in place, or what planning has been done for business continuity. It explains how backup must be included in every phase of system planning, development, operation, and maintenance. It also provides techniques for analyzing and impr...

  16. The Need for Strategic Planning for Nuclear Power Plant I and C Upgrades

    International Nuclear Information System (INIS)

    Hill, J. Douglas; Moore, Paul

    2002-01-01

    Nuclear power plants rely on Instrumentation and Control (I and C) systems for control, monitoring and protection of the plant. The original, analog designs used in most nuclear plants have become or soon will be obsolete, forcing plants to turn to digital technology. Many factors affect the design of replacement equipment, including long-term and short-term economics, regulatory issues, and the way the plant operates on a day-to-day basis. The first step to all modernization projects should involve strategic planning, to ensure that the overall long and short-term goals of the plant are met. Strategic planning starts with a thorough evaluation of the existing plant control systems, the available options, and the benefits and consequences of these options. (authors)

  17. Onsite and Electric Backup Capabilities at Critical Infrastructure Facilities in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, Julia A. [Argonne National Lab. (ANL), Argonne, IL (United States); Wallace, Kelly E. [Argonne National Lab. (ANL), Argonne, IL (United States); Kudo, Terence Y. [Argonne National Lab. (ANL), Argonne, IL (United States); Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-04-01

    The following analysis, conducted by Argonne National Laboratory’s (Argonne’s) Risk and Infrastructure Science Center (RISC), details an analysis of electric power backup of national critical infrastructure as captured through the Department of Homeland Security’s (DHS’s) Enhanced Critical Infrastructure Program (ECIP) Initiative. Between January 1, 2011, and September 2014, 3,174 ECIP facility surveys have been conducted. This study focused first on backup capabilities by infrastructure type and then expanded to infrastructure type by census region.

  18. Abnormal condition and events analysis for instrumentation and control systems. Volume 1: Methodology for nuclear power plant digital upgrades. Final report

    International Nuclear Information System (INIS)

    McKemy, S.; Marcelli, M.; Boehmer, N.; Crandall, D.

    1996-01-01

    The ACES project was initiated to identify a cost-effective methodology for addressing abnormal conditions and events (ACES) in digital upgrades to nuclear power plant systems, as introduced by IEEE Standard 7-4.3.2-1993. Several methodologies and techniques currently in use in the defense, aerospace, and other communities for the assurance of digital safety systems were surveyed, and although several were shown to possess desirable qualities, non sufficiently met the needs of the nuclear power industry. This report describes a tailorable methodology for performing ACES analysis that is based on the more desirable aspects of the reviewed methodologies and techniques. The methodology is applicable to both safety- and non-safety-grade systems, addresses hardware, software, and system-level concerns, and can be applied in either a lifecycle or post-design timeframe. Employing this methodology for safety systems should facilitate the digital upgrade licensing process

  19. Upgrade of DIII-D toroidal magnetic field power supply controls

    International Nuclear Information System (INIS)

    Petrach, P.M.; Rouleau, A.R.; McNulty, R.D.; Patrick, D.B.; Walin, J.L.

    1993-11-01

    The toroidal magnetic field power supply for the DIII-D tokamak is of the 12 pulse line commutated variety. It consists of four individual modules and a main system control cabinet which are combined to deliver 127,000 A and 1000 V to the toroidal field coil. The modules are connected in a series-parallel configuration but can be run alone or two at a time as well. Normally on DIII-D experiments, the series-parallel configuration is required. The original design provided each individual module with its own voltage and current control loop and a main control loop. A problem with this design was that the individual control loops would cause a current sharing imbalance in the parallel modules if the calibrated loops drifted by the slightest amount. It was determined that individual control loops were not needed and a single phase lock firing circuit was employed in the system cabinet with fiber optic links to the modules for gate drive signals. Since all four modules have to be on line for DIII-D to operate, a problem in any of the five E ampersand I control loops resulted in the supply, and, therefore, the tokamak, being idled. By reducing the number of control loops to one, the sharing problem was eliminated, as well as 4 out of 5 potential control failures. The original supply employed relay logic for sequence control and fault monitoring. There were over 130 relays in each module plus an additional 100 in the system cabinet. The combination of the number of relays with the required interconnecting wiring, the age of the supply, the vibrations of the cabinets and the harsh environment, resulted in a continuously escalating number of phantom, and often intermittent, faults. The fault and sequence logic relays were replaced by a new Programmable Logic Controller (PLC). All existing interconnect wire was removed and replaced with multiconductor cables that connect directly from fault sensors and input devices to the PLC

  20. A novel powering scheme based on DC-DC conversion for the luminosity upgrades of the CMS tracking system at CERN

    International Nuclear Information System (INIS)

    Sammet, Jan

    2014-01-01

    The instantaneous luminosity of the LHC is expected to reach 2 x 10 34 s -1 cm -2 and 5 x 10 34 s -1 cm -2 around the years 2019 and 2024, respectively. After the second upgrade the LHC will be referred to as the High Luminosity LHC (HL-LHC). In order to benefit from the higher luminosities, CMS foresees to upgrade its pixel detector during an extended winter shutdown of the LHC at the end of 2016 and the beginning of 2017. During a long shutdown of the LHC over the years 2022 and 2023, it is foreseen to install a completely new tracking system in CMS. Both upgrades are expected to result in the need to provide more electric current to the detector. However, power losses in cables already contribute 50% to the power consumption of the present tracker and rise with the current squared. Since no more space is available for cables, and thicker cables within the tracking volume spoil the material budget of the detector, new powering schemes are considered mandatory. CMS foresees the use of radiation tolerant DC-DC converters on the front-end to reduce power losses on cables. This thesis describes the new powering scheme of the CMS pixel detector and discusses the options with respect to a new strip tracker. A radiation and magnetic field tolerant DC-DC converter prototype, the PIXV8A, is introduced and the research that led to its development is summarised. The PIXV8A has been developed for the application in the pixel upgrade and is also a first approach for a DC-DC converter for the later upgrade of the CMS tracking system. The PIXV8A makes use of the AMIS4 chip, which has been proven to stay operational for total ionising doses of up to 1 MGy and fluences of up to 10 15 n eq /cm 2 . With an input voltage of 10 V, the PIXV8A converter provides an efficiency of about 80% for output voltages of 2.5 V and 3.0 V. Within this thesis the robustness of the novel powering scheme and the qualification of the PIXV8A are demonstrated in several tests, including system test

  1. DCS upgrades for nuclear power plants: Saving money and reducing risk through virtual-stimulation control system checkout

    International Nuclear Information System (INIS)

    McKim, G.; Yeager, M.; Weirich, C.

    2006-01-01

    Nuclear power plant control systems of 1970's vintage have reached the end of their life: reliability is poor and spare parts are hard to come by. At First Energy Perry station, two costly feedwater system trips caused by an ailing analog control system led to the decision to replace it with a modern Foxboro I/A-series Distributed Control System. The simulator was also upgraded using the Virtual-Stim simulation of I/A, called FSIM. Virtual-Stim simulation allows the configuration and graphics from the plant to be downloaded onto the simulator as-is, using the same tools and operator interface as the plant, without imprecise translations, conversions, or other emulation. Advances in simulation technology and market forces have led to an open architecture design, allowing FSIM to be 'bridged' to Perry's existing Opensim simulator process model. This appears to be an industry-wide trend as more control system vendors offer Virtual Stimulation solutions for connection to third-party simulation products. Taking a cue from First Energy's Sammis Station FSIM simulator projects, the Perry simulator was used for dedicated control verification and tuning. Preventing forced outages caused by control configuration errors can result in enormous savings, and the simulator is now required to precede any plant modifications rather than just a training tool that lags the plant. This testing revealed several surprising results for a relatively straightforward control strategy, showing that simulator-based testing will be even more crucial in the future as the remain-der of the balance of plant is migrated to digital control. (author)

  2. Comparison of Cloud backup performance and costs in Oracle database

    Directory of Open Access Journals (Sweden)

    Aljaž Zrnec

    2011-06-01

    Full Text Available Normal 0 21 false false false SL X-NONE X-NONE Current practice of backing up data is based on using backup tapes and remote locations for storing data. Nowadays, with the advent of cloud computing a new concept of database backup emerges. The paper presents the possibility of making backup copies of data in the cloud. We are mainly focused on performance and economic issues of making backups in the cloud in comparison to traditional backups. We tested the performance and overall costs of making backup copies of data in Oracle database using Amazon S3 and EC2 cloud services. The costs estimation was performed on the basis of the prices published on Amazon S3 and Amazon EC2 sites.

  3. Upgrade the intervention levels derived for water and foods, to be include in the PERE 607 procedure the external radiological emergency plan in the Laguna Verde nuclear power plant

    International Nuclear Information System (INIS)

    Llado Castillo, R.; Aguilar Pacheco, R.

    1998-01-01

    The work shows the results obtained in the upgrade the intervention levels derived for water and foods, to be include in the PERE 607 procedure the external radiological emergency plan in the Laguna Verde nuclear power plant

  4. Specification of requirements for upgrades using digital instrument and control systems. Report prepared within the framework of the international working group on nuclear power plant control and instrumentation

    International Nuclear Information System (INIS)

    1999-01-01

    The need to develop good specifications of requirements for instrument and control (I and C) systems applies throughout the world and is becoming more and more important as more upgrades are planned. Better guidance on how to develop good requirements specifications would support safer, more effective and more economical refits and upgrades. The need for this was pointed out by the IAEA International Working Group on Nuclear Power Plant Control and Instrumentation (IWG-NPPCI). This report is the result of a series of advisory and consultants meetings held by the IAEA in 1997 and 1998 in Vienna. The scope of the activities described covers a methodology for the determination of requirements and the development of the necessary specifications and plans needed through the life-cycle of digital instrumentation and control systems. It is restricted to technical aspects and indicates subjects which should be included in specifications and plans at different phases

  5. Experiences in seismic upgrading of equipment and structures in Kozloduy nuclear power plant (440 WWER-PWR)

    International Nuclear Information System (INIS)

    Ordonez Villalobos, A.

    1993-01-01

    Within the framework of the 'Emergency programme for Nuclear Safety of Kozloduy NPP' it has been concluded that the increase in seismic safety of a NPP can be achieved by upgrading the key equipment in a cost effective way. Essential and vulnerable equipment has to be identified. Seismic capacity should be evaluated base don realistic state of the art criteria. Seismic review teams ef experienced engineers should conduct planned walk-downs in order to propose effective upgrading solutions. Team work of plan engineers and construction engineers would enhance the effectiveness of the solutions. It is recommended that all the participants be motivated and have a clear understanding of the objectives of the upgrading

  6. Reflective memory recorder upgrade: an opportunity to benchmark PowerPC and Intel architectures for real time

    Science.gov (United States)

    Abuter, Roberto; Tischer, Helmut; Frahm, Robert

    2014-07-01

    quantitative comparison between the two implementations (PowerPC14 and Intel Multicore20, 15) under different workloads will be presented. In particular, the interrupt handling, the reflective memory access, DMA readout, and TCP stack performances will be compared. To test the limits of the new hardware, the separation, on the different cores, of each of the basic tasks, as the readout, the network transfer, etc, were implemented and throughput reevaluated. The result shows that the RMN recorder1 can extend its operational range from 10 KHz to above 16 KHz by moving from a PowerPC14 to Intel Multicore20, 15. In general, a reduction of latencies and computational delays of could be expected by upgrading applications to Intel Multicore20, 15 architectures.

  7. The role of IAEA in the seismic assessment and upgrading of existing NPPs. Seismic safety of nuclear power plants in Eastern Europe

    Energy Technology Data Exchange (ETDEWEB)

    Guerpinar, A; Godoy, A [International Atomic Energy Agency, Vienna (IAEA). Div. of Nuclear Installation Safety

    1997-03-01

    This paper summarizes the work performed by the International Atomic Energy Agency in the areas of safety reviews and applied research in support of programmes for the assessment and enhancement of seismic safety in Eastern Europe and in particular WWER type nuclear power plants during the past seven years. Three major topics are discussed; engineering safety review services in relation to external events, technical guidelines for the assessment and upgrading of WWER type nuclear power plants, and the Coordinated Research Programme on `Benchmark study for the seismic analysis and testing of WWER type nuclear power plants`. These topics are summarized in a way to provide an overview of the past and present safety situation in selected WWER type plants which are all located in Eastern European countries. Main conclusion of the paper is that although there is now a thorough understanding of the seismic safety issues in these operating nuclear power plants, the implementation of seismic upgrades to structures, systems and components are lagging behind, particularly for those cases in which the re-evaluation indicated the necessity to strengthen the safety related structures or install new safety systems. (author)

  8. The role of IAEA in the seismic assessment and upgrading of existing NPPs. Seismic safety of nuclear power plants in Eastern Europe

    International Nuclear Information System (INIS)

    Guerpinar, A.; Godoy, A.; . Div. of Nuclear Installation Safety)

    1997-01-01

    This paper summarizes the work performed by the International Atomic Energy Agency in the areas of safety reviews and applied research in support of programmes for the assessment and enhancement of seismic safety in Eastern Europe and in particular WWER type nuclear power plants during the past seven years. Three major topics are discussed; engineering safety review services in relation to external events, technical guidelines for the assessment and upgrading of WWER type nuclear power plants, and the Coordinated Research Programme on 'Benchmark study for the seismic analysis and testing of WWER type nuclear power plants'. These topics are summarized in a way to provide an overview of the past and present safety situation in selected WWER type plants which are all located in Eastern European countries. Main conclusion of the paper is that although there is now a thorough understanding of the seismic safety issues in these operating nuclear power plants, the implementation of seismic upgrades to structures, systems and components are lagging behind, particularly for those cases in which the re-evaluation indicated the necessity to strengthen the safety related structures or install new safety systems. (author)

  9. Researching, Evaluating, and Choosing a Backup Service in the Cloud

    Science.gov (United States)

    Hastings, Robin

    2012-01-01

    Backups are a modern fact of life. Every organization that has any kind of computing technology (and that is all of them these days) needs to back up its data in case of technological or user errors. Traditionally, large-scale backups have been done via an internal or external tape drive that takes magnetic tapes (minicassettes, essentially) and…

  10. STS-9 payload specialists and backup in training session

    Science.gov (United States)

    1983-01-01

    Two Spacelab 1 payload specialists and a backup for that flight prepare for a training session in the JSC mockup and integration laboratory. Fully decked out in the Shuttle constant wear garments (foreground) are Ulf Merbold, left, and Byron K. Licktenberg, prime crewmembers on the STS-9 team. In civilian clothes is payload specialist backup Michael L. Lampton.

  11. The near-source impacts of diesel backup generators in urban environments

    Science.gov (United States)

    Tong, Zheming; Zhang, K. Max

    2015-05-01

    Distributed power generation, located close to consumers, plays an important role in the current and future power systems. However, its near-source impacts in complex urban environments are not well understood. In this paper, we focused on diesel backup generators that participate in demand response (DR) programs. We first improved the micro-environmental air quality simulations by employing a meteorology processor, AERMET, to generate site-specific boundary layer parameters for the Large Eddy Simulation (LES) modeling. The modeling structure was then incorporated into the CTAG model to evaluate the environmental impacts of diesel backup generators in near-source microenvironments. We found that the presence of either tall upwind or downwind building can deteriorate the air quality in the near-stack street canyons, largely due to the recirculation zones generated by the tall buildings, reducing the near-stack dispersion. Decreasing exhaust momentum ratio (stack exit velocity/ambient wind velocity) draws more exhaust into the recirculation zone, and reduces the effective stack height, which results in elevated near-ground concentrations inside downwind street canyons. The near-ground PM2.5 concentration for the worst scenarios could well exceed 100 μg m-3, posing potential health risk to people living and working nearby. In general, older diesel backup generators (i.e., Tier 1, 2 or older) without the up-to-date emission control may significantly increase the pollutant concentration in the near-source street canyons if participating in DR programs. Even generators that comply with Tier-4 standards could lead to PM hotspots if their stacks are next to tall buildings. Our study implies that the siting of diesel backup generators stacks should consider not only the interactions of fresh air intake and exhaust outlet for the building housing the backup generators, but also the dispersion of exhaust plumes in the surrounding environment.

  12. Flight test of a resident backup software system

    Science.gov (United States)

    Deets, Dwain A.; Lock, Wilton P.; Megna, Vincent A.

    1987-01-01

    A new fault-tolerant system software concept employing the primary digital computers as host for the backup software portion has been implemented and flight tested in the F-8 digital fly-by-wire airplane. The system was implemented in such a way that essentially no transients occurred in transferring from primary to backup software. This was accomplished without a significant increase in the complexity of the backup software. The primary digital system was frame synchronized, which provided several advantages in implementing the resident backup software system. Since the time of the flight tests, two other flight vehicle programs have made a commitment to incorporate resident backup software similar in nature to the system described here.

  13. PSI: Upgrading

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade

  14. PSI: Upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1992-09-15

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade.

  15. The concept of underground nuclear heat and power plants (UNHPP) of upgraded safety, developed on the basis of ship-building technologies

    International Nuclear Information System (INIS)

    Pashin, V.M.; Petrov, Eh.L.; Shalik, G.P.; Khazov, B.S.; Malyshev, S.P.

    1996-01-01

    A concept of underground nuclear heat and power plants (UNHPP) of upgraded safety on the basis of ship-building technologies is considered, in which the priority is set to population security and environmental protection. Ways of realization of ziro radiation risk for the population residing in a close vicinity of UNHPP are substantiated. basic principles of the concept are formulated which envisage the use of ship propulsion reactor facilities that have been multiply tested in operation. The sources of economic competitiveness of UNHPPs, as compared with the existing NPPs, are shown

  16. ATLAS ITk Short Strip Prototype Module with Integrated DCDC Powering and Control Phase II Upgrade of the ATLAS Inner Tracker detector at the HL - LHC

    CERN Document Server

    Greenall, Ashley; The ATLAS collaboration

    2017-01-01

    The prototype Barrel module design, for the Phase II upgrade of the of the new Inner Tracker (ITk) detector at the LHC, has adopted an integrated low mass assembly featuring single-sided flexible circuits, with readout ASICs, glued to the silicon strip sensor. Further integration has been achieved by the attachment of module DCDC powering, HV sensor biasing switch and autonomous monitoring and control to the sensor. This low mass, integrated module approach benefits further in a reduced width stave structure to which the modules are attached. The results of preliminary electrical tests of such an integrated module will be presented.

  17. Comparison of Cloud vs. Tape Backup Performance and Costs with Oracle Database

    OpenAIRE

    Zrnec, Aljaž; Lavbič, Dejan

    2011-01-01

    Current practice of backing up data is based on using backup tapes and remote locations for storing data. Nowadays, with the advent of cloud computing a new concept of database backup emerges. The paper presents the possibility of making backup copies of data in the cloud. We are mainly focused on performance and economic issues of making backups in the cloud in comparison to traditional backups. We tested the performance and overall costs of making backup copies of data in Ora...

  18. Reactor shutdown back-up system

    International Nuclear Information System (INIS)

    Hirao, Seizo; Sakashita, Motoaki.

    1982-01-01

    Purpose: To prevent back flow of poison upon injection to a moderator recycling pipeway. Constitution: In a nuclear reactor comprising a moderator recycling system for recycling and cooling moderator through a control rod guide pipe and a rapid poison injection system for rapidly injecting a poison solution at high density into the moderator by way of the same control rod guide pipe as a reactor shutdown back-up system, a mechanism is provided for preventing the back flow of a poison solution at high density into the moderator recycling system upon rapid injection of poison. An orifice provided in the joining pipeway to the control rod guide pipe on the side of the moderator recycling system is utilized as the back flow preventing device for the poison solution and the diameter for the orifice is determined so as to provide a constant ratio between the pressure loss in the control rod guide pipe and the pressure loss in the moderator recycling system pipe line upon usual reactor operation. (Kawakami, Y.)

  19. Feasibility study of the university of Utah TRIGA reactor power upgrade - part II: Thermohydraulics and heat transfer study in respect to cooling system requirements and design

    Directory of Open Access Journals (Sweden)

    Babitz Philip

    2013-01-01

    Full Text Available The thermodynamic conditions of the University of Utah's TRIGA Reactor were simulated using SolidWorks Flow Simulation, Ansys, Fluent and PARET-ANL. The models are developed for the reactor's currently maximum operating power of 90 kW, and a few higher power levels to analyze thermohydraulics and heat transfer aspects in determining a design basis for higher power including the cost estimate. It was found that the natural convection current becomes much more pronounced at higher power levels with vortex shedding also occurring. A departure from nucleate boiling analysis showed that while nucleate boiling begins near 210 kW it remains in this state and does not approach the critical heat flux at powers up to 500 kW. Based on these studies, two upgrades are proposed for extended operation and possibly higher reactor power level. Together with the findings from Part I studies, we conclude that increase of the reactor power is highly feasible yet dependable on its purpose and associated investments.

  20. Thermal power calibration of the TRIGA Mark I IPR-R1 reactor during the upgrading tests to 250 kW

    International Nuclear Information System (INIS)

    Mesquita, Amir Zacarias; Maretti, Fausto Junior; Rezende, Hugo Cesar

    2002-01-01

    This paper presents the results and the methodology used to calibrate the thermal power of the TRIGA MARK I IPR-R1 Reactor in CDTN, Belo Horizonte, Brazil. This calibration was realized during the operation tests carried out to allow the reactor power upgrade from the current 100 kW to 250 kW. The methodology consisted in the measurement of the inlet and outlet temperature and the water flow in the primary cooling loop. The thermal balance together with the thermal losses gave the thermal power. There were made three sequences of tests. The first rising of the thermal power was made with the usual configuration of the core (59 fuel elements). After the changing of the ion chambers position and the control rod and the increase of the number of fuels (63 fuel elements), a new evaluation of the thermal power was accomplished, having been obtained a thermal power of 234 kW, for an indication of 250 kW in the lineal channel. After the return of the core to the initial configuration (59 fuel elements), it took place a new test, getting back the reactor to the power level of 100 kW. (author)

  1. Oracle Database 12c backup and recovery survival guide

    CERN Document Server

    Alvarez, Francisco Munoz

    2013-01-01

    The book follows a tutorial-based approach, covering all the best practices for backup and recovery. The book starts by introducing readers to the world of backup and recovery, then moves on to teach them the new features offered by Oracle 12c. The book is full of useful tips and best practices that are essential for any DBA to perform backup and recovery operations in an organization.This book is designed for Oracle DBAs and system administrators. The reader will have a basic working experience of administering Oracle databases. This book is designed for Oracle DBAs and system administrators.

  2. Feasibility study of upgrading Byllesby and Buck power plants on the New River in the Commonwealth of Virginia

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    The feasibility of upgrading alternatives of the 66-year-old Byllesby and Buck hydroelectric developments located on the New River in Virginia was investigated. Evaluation of technical, economic and environmental factors led to the conclusion that modernization of the plants could result in an annual generation increase of 20.2 GWh at a cost of $6.1 million and with a benefit-cost ratio of 2.32. The recommended retrofitting includes replacing existing runners with new, more efficiently designed runners, modifying draft tube and wicker gate, and rewinding the generators. (LCL)

  3. Design, Fabrication and High Power RF Test of a C-band Accelerating Structure for Feasibility Study of the SPARC photo-injector energy upgrade

    CERN Document Server

    Alesini, D.; Di Pirro, G.; Di Raddo, R.; Ferrario, M.; Gallo, A.; Lollo, V.; Marcellini, F.; Higo, T.; Kakihara, K.; Matsumoto, S.; Campogiani, G.; Mostacci, A.; Palumbo, L.; Persichelli, S.; Spizzo, V.; Verdú-Andrés, S.

    2011-01-01

    The energy upgrade of the SPARC photo-injector from 160 to more than 260 MeV will be done by replacing a low gradient 3m S-Band structure with two 1.4m high gradient C-band structures. The structures are travelling wave, constant impedance sections, have symmetric waveguide input couplers and have been optimized to work with a SLED RF input pulse. A prototype with a reduced number of cells has been fabricated and tested at high power in KEK (Japan) giving very good performances in terms of breakdown rates (10^6 bpp/m) at high accelerating gradient (>50 MV/m). The paper illustrates the design criteria of the structures, the fabrication procedure and the high power RF test results.

  4. The challenge of backup power in the NPP after the accident at Fukushima, alternatives; El reto de la energia de resplado en las CC.NN. despues del accidente de Fukushima, alternativas

    Energy Technology Data Exchange (ETDEWEB)

    Contreras, C.; Gomez, A.; Gavilan, C.; Archilla, J.; Tagle, J. A.

    2014-07-01

    After the accident in Fukushima has been demonstrated the importance of having in the first hours with an independent power supply of the emergency diesel generators. In conclusion it can be said that usual (Pb batteries) storage technology is insufficient, since much more space in the rooms would be needed to achieve the required stored energy. And although just appear on the market solutions alternatives, the most advanced battery technologies still have some problems to be able to use in these applications with guarantees. A solution that arises is the combination of batteries and fuel cells. On the other hand is needed a closer collaboration with researchers and developers of batteries so that they take into account the needs of plants, so that manufactured batteries with more density energy, more power and they are more reliable. These features provide benefits in other fields besides nuclear plants. (Author)

  5. An Actuator Control Unit for Safety-Critical Mechatronic Applications with Embedded Energy Storage Backup

    Directory of Open Access Journals (Sweden)

    Sergio Saponara

    2016-03-01

    Full Text Available This paper presents an actuator control unit (ACU with a 450-J embedded energy storage backup to face safety critical mechatronic applications. The idea is to ensure full operation of electric actuators, even in the case of battery failure, by using supercapacitors as a local energy tank. Thanks to integrated switching converter circuitry, the supercapacitors provide the required voltage and current levels for the required time to guarantee actuator operation until the system enters into safety mode. Experimental results are presented for a target application related to the control of servomotors for a robotized prosthetic arm. Mechatronic devices for rehabilitation or assisted living of injured and/or elderly people are available today. In most cases, they are battery powered with lithium-based cells, providing high energy density and low weight, but at the expense of a reduced robustness compared to lead-acid- or nickel-based battery cells. The ACU of this work ensures full operation of the wearable robotized arm, controlled through acceleration and electromyography (EMG sensor signals, even in the case of battery failure, thanks to the embedded energy backup unit. To prove the configurability and scalability of the proposed solution, experimental results related to the electric actuation of the car door latch and of a robotized gearbox in vehicles are also shown. The reliability of the energy backup device has been assessed in a wide temperature range, from −40 to 130 °C, and in a durability test campaign of more than 10,000 cycles. Achieved results prove the suitability of the proposed approach for ACUs requiring a burst of power of hundreds of watts for only a few seconds in safety-critical applications. Alternatively, the aging and temperature characterizations of energy backup units is limited to supercapacitors of thousands of farads for high power applications (e.g., electric/hybrid propulsion and with a temperature range limited to

  6. solar dryer with biomass backup heater for drying fruits

    African Journals Online (AJOL)

    SOLAR DRYER WITH BIOMASS BACKUP HEATER FOR DRYING FRUITS: DEVELOPMENT AND PERFORMANCE ANALYSIS. ... Journal of Science and Technology (Ghana) ... Most solar dryers rely on only solar energy as the heat source.

  7. A Survey on Backup of Data on Remote Server

    OpenAIRE

    Raje, Manali; Mukhopadhyay, Debajyoti

    2015-01-01

    Large amount of electronic data is generated in Cloud computing every day. Efficient maintenance of this data requires proper services. Hence a method to collect data securely, by protecting and developing backups is mentioned. The Objective is to provide Auto Response Server, better solutions for data backup and restoring using Cloud. Data can be collected and sent to a centralized repository in a platform independent format without any network consideration. This data can then be used accor...

  8. RAICS AS ADVANCED CLOUD BACKUP TECHNOLOGY IN TELECOMMUNICATION NETWORKS

    OpenAIRE

    Luntovskyy, Andriy; Vasyutynskyy, Volodymyr; Spillner, Josef

    2014-01-01

    Data crashes can cause unpredictable and even hard-out effects for an enterprise or authority. Backup strategies as antidote uni-fy a complex of organizational and technical measures that are necessary for data restoring, processing and transfer as well as for data security and defense against its loss, crash and tampering. High-performance modern Internet allows delivery of back-up functions and is complemented by attractive (mobile) services with a Quality of Service comparable to that in L...

  9. Alkali Metal Backup Cooling for Stirling Systems - Experimental Results

    Science.gov (United States)

    Schwendeman, Carl; Tarau, Calin; Anderson, William G.; Cornell, Peggy A.

    2013-01-01

    In a Stirling Radioisotope Power System (RPS), heat must be continuously removed from the General Purpose Heat Source (GPHS) modules to maintain the modules and surrounding insulation at acceptable temperatures. The Stirling convertor normally provides this cooling. If the Stirling convertor stops in the current system, the insulation is designed to spoil, preventing damage to the GPHS at the cost of an early termination of the mission. An alkali-metal Variable Conductance Heat Pipe (VCHP) can be used to passively allow multiple stops and restarts of the Stirling convertor. In a previous NASA SBIR Program, Advanced Cooling Technologies, Inc. (ACT) developed a series of sodium VCHPs as backup cooling systems for Stirling RPS. The operation of these VCHPs was demonstrated using Stirling heater head simulators and GPHS simulators. In the most recent effort, a sodium VCHP with a stainless steel envelope was designed, fabricated and tested at NASA Glenn Research Center (GRC) with a Stirling convertor for two concepts; one for the Advanced Stirling Radioisotope Generator (ASRG) back up cooling system and one for the Long-lived Venus Lander thermal management system. The VCHP is designed to activate and remove heat from the stopped convertor at a 19 degC temperature increase from the nominal vapor temperature. The 19 degC temperature increase from nominal is low enough to avoid risking standard ASRG operation and spoiling of the Multi-Layer Insulation (MLI). In addition, the same backup cooling system can be applied to the Stirling convertor used for the refrigeration system of the Long-lived Venus Lander. The VCHP will allow the refrigeration system to: 1) rest during transit at a lower temperature than nominal; 2) pre-cool the modules to an even lower temperature before the entry in Venus atmosphere; 3) work at nominal temperature on Venus surface; 4) briefly stop multiple times on the Venus surface to allow scientific measurements. This paper presents the experimental

  10. Questions to the reactors power upgrade of the Nuclear Power Plant of Laguna Verde; Cuestionamientos al aumento de potencia de los reactores de la Central Nuclear de Laguna Verde

    Energy Technology Data Exchange (ETDEWEB)

    Salas M, B., E-mail: salasmarb@yahoo.com.mx [UNAM, Facultad de Ciencias, Departamento de Fisica, Circuito exterior s/n, Ciudad Universitaria, 04510 Mexico D. F. (Mexico)

    2014-08-15

    The two reactors of the Nuclear Power Plant of Laguna Verde (NPP-L V) were subjected to power upgrade labors with the purpose of achieving 20% upgrade on the original power; these labors concluded in August 24, 2010 for the Reactor 1 and in January 16, 2011 for the Reactor 2, however in January of 2014, the NNP-L V has not received by part of the Comision Nacional de Seguridad Nuclear y Salvaguardias (CNSNS) the new Operation License to be able to work with the new power, because it does not fulfill all the necessary requirements of safety. In this work is presented and analyzed the information obtained in this respect, with data provided by the Instituto Federal de Acceso a la Informacion Publica y Proteccion de Datos (IFAI) and the Comision Federal de Electricidad (CFE) in Mexico, as well as the opinion of some workers of the NPP-L V. The Governing Board of the CFE announcement that will give special continuation to the behavior on the operation and reliability of the NPP-L V, because the frequency of not announced interruptions was increased 7 times more in the last three years. (Author)

  11. Experience from design, prototyping and production of a DC-DC conversion powering scheme for the CMS Phase-1 Pixel Upgrade

    International Nuclear Information System (INIS)

    Feld, L.; Karpinski, W.; Klein, K.; Lipinski, M.; Preuten, M.; Rauch, M.; Schmitz, S.; Wlochal, M.

    2016-01-01

    The CMS collaboration has adopted a DC-DC conversion powering scheme for the Phase-1 Upgrade of its pixel detector. DC-DC buck converters with a conversion ratio of around 3 are installed on the support structures, outside of the sensitive tracking region, requiring a re-design of the low and high voltage distribution to the pixel modules. After several years of R and D, the project has entered the production phase. A total of 1800 DC-DC converters are being produced, and rigorous quality assurance and control is being employed during the production process. The testing program is outlined, results from mass production are presented and issues that have been encountered are described. In addition, two system level challenges, namely the choice of output voltage in the presence of large, load-dependent voltage drops, and the thermal management required to remove the heat load caused by the DC-DC converters, are discussed

  12. Upgrade of the AGS H- linac

    International Nuclear Information System (INIS)

    Alessi, J.G.; Buxton, W.; Kponou, A.; LoDestro, V.; Mapes, M.; McNerney, A.J.; Raparia, D.

    1994-01-01

    The AGS linac presently accelerates 25 mA of H - to 200 MeV at a 5 Hz rep-rate and 500 μs pulse width. The Booster takes 4 pulses every 3.8 seconds, and the remaining pulses are used for isotope production. The authors are in the process of upgrading the linac to increase the average current delivered for isotope production by more than a factor of two, while at the same time expecting to decrease linac downtime. Various aspects of this upgrade are discussed, including the upgrade of the control system, new high power transmission line, transport line vacuum, and rf power supply system upgrades

  13. Developing architecture for upgrading I and C systems of an operating nuclear power plant using a quality attribute-driven design method

    Energy Technology Data Exchange (ETDEWEB)

    Suh, Yong Suk; Keum, Jong Yong [SMART Technology Validation Division, Korea Atomic Energy Research Institute, 150-1 Dukjin-dong, Yuseong-gu, Daejon (Korea, Republic of); Kim, Hyeon Soo, E-mail: hskim401@cnu.ac.kr [Department of Computer Science and Engineering, Chungnam Nat' l Univ., 220 Gung-dong, Yuseong-gu, Daejon (Korea, Republic of)

    2011-12-15

    This paper presents the architecture for upgrading the instrumentation and control (I and C) systems of a Korean standard nuclear power plant (KSNP) as an operating nuclear power plant. This paper uses the analysis results of KSNP's I and C systems performed in a previous study. This paper proposes a Preparation-Decision-Design-Assessment (PDDA) process that focuses on quality oriented development, as a cyclical process to develop the architecture. The PDDA was motivated from the practice of architecture-based development used in software engineering fields. In the preparation step of the PDDA, the architecture of digital-based I and C systems was setup for an architectural goal. Single failure criterion and determinism were setup for architectural drivers. In the decision step, defense-in-depth, diversity, redundancy, and independence were determined as architectural tactics to satisfy the single failure criterion, and sequential execution was determined as a tactic to satisfy the determinism. After determining the tactics, the primitive digital-based I and C architecture was determined. In the design step, 17 systems were selected from the KSNP's I and C systems for the upgrade and functionally grouped based on the primitive architecture. The overall architecture was developed to show the deployment of the systems. The detailed architecture of the safety systems was developed by applying a 2-out-of-3 voting logic, and the detailed architecture of the non-safety systems was developed by hot-standby redundancy. While developing the detailed architecture, three ways of signal transmission were determined with proper rationales: hardwire, datalink, and network. In the assessment step, the required network performance, considering the worst-case of data transmission was calculated: the datalink was required by 120 kbps, the safety network by 5 Mbps, and the non-safety network by 60 Mbps. The architecture covered 17 systems out of 22 KSNP's I and C

  14. Developing architecture for upgrading I and C systems of an operating nuclear power plant using a quality attribute-driven design method

    International Nuclear Information System (INIS)

    Suh, Yong Suk; Keum, Jong Yong; Kim, Hyeon Soo

    2011-01-01

    This paper presents the architecture for upgrading the instrumentation and control (I and C) systems of a Korean standard nuclear power plant (KSNP) as an operating nuclear power plant. This paper uses the analysis results of KSNP's I and C systems performed in a previous study. This paper proposes a Preparation–Decision–Design–Assessment (PDDA) process that focuses on quality oriented development, as a cyclical process to develop the architecture. The PDDA was motivated from the practice of architecture-based development used in software engineering fields. In the preparation step of the PDDA, the architecture of digital-based I and C systems was setup for an architectural goal. Single failure criterion and determinism were setup for architectural drivers. In the decision step, defense-in-depth, diversity, redundancy, and independence were determined as architectural tactics to satisfy the single failure criterion, and sequential execution was determined as a tactic to satisfy the determinism. After determining the tactics, the primitive digital-based I and C architecture was determined. In the design step, 17 systems were selected from the KSNP's I and C systems for the upgrade and functionally grouped based on the primitive architecture. The overall architecture was developed to show the deployment of the systems. The detailed architecture of the safety systems was developed by applying a 2-out-of-3 voting logic, and the detailed architecture of the non-safety systems was developed by hot-standby redundancy. While developing the detailed architecture, three ways of signal transmission were determined with proper rationales: hardwire, datalink, and network. In the assessment step, the required network performance, considering the worst-case of data transmission was calculated: the datalink was required by 120 kbps, the safety network by 5 Mbps, and the non-safety network by 60 Mbps. The architecture covered 17 systems out of 22 KSNP's I and C systems. The

  15. Simplified Analytic Approach of Pole-to-Pole Faults in MMC-HVDC for AC System Backup Protection Setting Calculation

    Directory of Open Access Journals (Sweden)

    Tongkun Lan

    2018-01-01

    Full Text Available AC (alternating current system backup protection setting calculation is an important basis for ensuring the safe operation of power grids. With the increasing integration of modular multilevel converter based high voltage direct current (MMC-HVDC into power grids, it has been a big challenge for the AC system backup protection setting calculation, as the MMC-HVDC lacks the fault self-clearance capability under pole-to-pole faults. This paper focused on the pole-to-pole faults analysis for the AC system backup protection setting calculation. The principles of pole-to-pole faults analysis were discussed first according to the standard of the AC system protection setting calculation. Then, the influence of fault resistance on the fault process was investigated. A simplified analytic approach of pole-to-pole faults in MMC-HVDC for the AC system backup protection setting calculation was proposed. In the proposed approach, the derived expressions of fundamental frequency current are applicable under arbitrary fault resistance. The accuracy of the proposed approach was demonstrated by PSCAD/EMTDC (Power Systems Computer-Aided Design/Electromagnetic Transients including DC simulations.

  16. Tandem mirror experiment-upgrade neutral beam test stand: a powerful tool for development and quality assurance

    International Nuclear Information System (INIS)

    Hibbs, S.M.; Kane, R.J.; Kerr, R.G.; Poulsen, P.

    1983-01-01

    During construction of the Tandem Mirror Experiment-Upgrade (TMX-U), we assembled a test stand to develop electronics for the neutral beam system. In the first six months of test stand use we operated a few neutral beam injector modules and directed considerable effort toward improving the electronic system. As system development progressed, our focus turned toward improving the injector modules themselves. The test stand has proved to be the largest single contributor to the successful operation of neutral beams on TMX-U, primarily because it provides quality assurance andd development capability in conjunction with the scheduled activities of the main experiment. This support falls into five major categories: (1) electronics development, (2) operator training, (3) injector module testing and characterization, (4) injector module improvements, and (5) physics improvements (through areas affected by injector operation). Normal day-to-day operation of the test stand comes under the third category, testing and characterization, and comprises our final quality assurance activity for newly assembled or repaired modules before they are installed on TMX-U

  17. Tandem Mirror Experiment-Upgrade neutral beam test stand: A powerful tool for development and quality assurance

    International Nuclear Information System (INIS)

    Hibbs, S.M.; Kane, R.J.; Kerr, R.G.; Poulsen, P.

    1983-01-01

    During construction of the Tandem Mirror Experiment-Upgrade (TMX-U), a test stand was assembled to develop electronics for the neutral beam system. In the first six months of test stand use the authors operated a few neutral beam injector modules and directed considerable effort toward improving the electronic system. As system development progressed, the focus turned toward improving the injector modules themselves. The test stand has proved to be the largest single contributor to the successful operation of neutral beams on TMX-U, primarily because it provides quality assurance and development capability in conjunction with the scheduled activities of the main experiment. This support falls into five major categories: (1) electronics development, (2) operator training, (3) injector module testing and characterization, (4) injector module improvements, and (5) physics improvements (through areas affected by injector operation). Normal day-to-day operation of the test stand comes under the third category, testing and characterization, and comprises the final quality assurance activity for newly assembled or repaired modules before they are installed on TMX-U. They have also used the test stand to perform a series of physics experiments, including: reducing gas flow through valve and arc chamber characterization, reducing impurities by titanium gettering, and reducing streaming gas using apertures and collisional gas dynamics

  18. Commissioning and operation of 130 kV/130 A switched-mode HV power supplies with the upgraded JET neutral beam injectors

    International Nuclear Information System (INIS)

    Edwards, D.C.; Bigi, M.; Brown, D.P.D.; Ganuza, D.; Garcia, F.; Hudson, Z.; Jones, T.T.C.; Perez, A.

    2005-01-01

    The design features, on-site testing, commissioning and operation are described of two new 130 kV/130 A HV power supply units serving four upgraded 130 kV/60 A positive ion neutral injectors (PINIs) on JET. Both units were factory tested at full power and pulse length into dummy resistive load. Following on-site installation, the factory tests were repeated. The transition from dummy-load testing to PINI operation required full integration of the HVPS within the overall JET control system, and rigorous testing of the co-ordinated actions and protections of all PINI power supplies (filament and arc for plasma source and negative suppression grid). The implementation of these functions is described. Extensive use was made of parasitic integrated test pulses, where the other PINIs could be operated normally, with the HVPS energised under full remote control together with the corresponding PINI plasma sources, but with the HVPS connected to dummy load. The amount of NB operation time dedicated to commissioning was thereby minimised, yet gave a high degree of confidence of readiness for HV energisation of the PINI, and first beam operation followed less than 24 h from HV connection to the PINI. The routine operating experience and performance, including load protection characteristics of the new HVPS units are also described

  19. A theoretical-experimental study of backup bearings

    DEFF Research Database (Denmark)

    Lampe Linhares da Fonseca, Cesar Augusto

    of two types of backup bearings, which are investigated experimentally and theoretically. The first type is a conventional ball bearing commonly used in industrial applications. The second is an unconventional bearing that, which contains pins inside the clearance for the rotor to impact on. The main...... both types of bearings for further investigation. Also, a full failure of the control and a rotor drop on the ball bearing as backup bearing is investigated by removing the magnetic forces. The nonlinear features of the dynamics of the rotor are assessed for different levels of unbalance. It has been...... radial forces. Remaining in this condition, it may lead to permanent damage or total failure of the machine. This is why the backup bearing design has to be carefully planned and investigated as to whether it helps to protect the integrity of the machine. This PhD thesis provides a comprehensive study...

  20. Zinc Bromide Flow Battery Installation for Islanding and Backup Power

    Science.gov (United States)

    2016-09-18

    specs delivered system common with other Gen1 deliveries • Cons: Requires 6mo extension • Risk Level: Mitigated through flexibility on deliverable...This in addition to interaction with the AE inverter started causing oscillations in the voltage control of the microgrid. Small flickers were

  1. Role of advanced RF/microwave technology and high power switch technology for developing/upgrading compact/existing accelerators

    International Nuclear Information System (INIS)

    Shrivastava, Purushottam

    2001-01-01

    With the advances in high power microwave devices as well as in microwave technologies it has become possible to go on higher frequencies at higher powers as well as to go for newer devices which are more efficient and compact and hence reducing the power needs as well as space and weight requirement for accelerators. New devices are now available in higher frequency spectrum for example at C-Band, X-band and even higher. Also new devices like klystrodes/Higher Order Mode Inductive Output Tubes (HOM IOTs) are now becoming competitors for existing tubes which are in use at present accelerator complexes. The design/planning of the accelerators used for particle physics research, medical accelerators, industrial irradiation, or even upcoming Driver Accelerators for Sub Critical Reactors for nuclear power generation are being done taking into account the newer technologies. The accelerators which use magnetrons, klystrons and similar devices at S-Band can be modified/redesigned with devices at higher frequencies like X-Band. Pulsed accelerators need high power high voltage pulsed modulators whereas CW accelerators need high voltage power supplies for functioning of RF / Microwave tubes. There had been a remarkable growth in the development and availability of solid state switches both for switching the pulsed modulators for microwave tubes as well as for making high frequency switch mode power supplies. Present paper discusses some of the advanced devices/technologies in this field as well as their capability to make advanced/compact/reliable accelerators. Microwave systems developed/under development at Centre for Advanced Technology are also discussed briefly along with some of the efforts done to make them compact. An overview of state of art vacuum tube devices and solid state switch technologies is given. (author)

  2. Addressing Obsolescence in Operating Power Stations by Implementation of Safety Related Digital Upgrades Paper for Spanish Nuclear Society

    Energy Technology Data Exchange (ETDEWEB)

    Legrand, R.

    2014-07-01

    Obsolescence of Instrumentation and Controls is a major problem facing operating Nuclear Power Stations globally. AREVA is the only supplier that has supported the successful licensing, engineering, procurement, installation and commissioning of a full-scope digital Instrumentation and Control (I and C) Protection System in the United States. (Author)

  3. Environmental Assessment for Electrical Power System Upgrades at Los Alamos National Laboratory, Los Alamos, New Mexico - Final Document

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-03-09

    The ''National Environmental Policy Act of 1969'' (NEPA) requires Federal agency officials to consider the environmental consequences of their proposed actions before decisions are made. In complying with NEPA, the United States (U.S.) Department of Energy (DOE) follows the Council on Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508) and DOE's NEPA implementing procedures (10 CFR 1021). The purpose of an Environmental Assessment (EA) is to provide Federal decision makers with sufficient evidence and analysis to determine whether to prepare an Environmental Impact Statement (EIS) or issue a Finding of No Significant Impact. In this case, the DOE decision to be made is whether to construct and operate a 19.5-mile (mi) (31-kilometer [km]) electric transmission line (power line) reaching from the Norton Substation, west across the Rio Grande, to locations within the Los Alamos National Laboratory (LANL) Technical Areas (TAs) 3 and 5 at Los Alamos, New Mexico. The construction of one electric substation at LANL would be included in the project as would the construction of two line segments less than 1,200 feet (ft) (366 meters [m]) long that would allow for the uncrossing of a portion of two existing power lines. Additionally, a fiber optics communications line would be included and installed concurrently as part of the required overhead ground conductor for the power line. The new power line would improve the reliability of electric service in the LANL and Los Aktrnos County areas as would the uncrossing of the crossed segments of the existing lines. Additionally, installation of the new power line would enable the LANL and the Los Alamos County electric grid, which is a shared resource, to be adapted to accommodate the future import of increased power when additional power service becomes available in the northern New Mexico area. Similarly, the fiber optics line would allow DOE to take advantage of

  4. The depth of the honeybee's backup sun-compass systems.

    Science.gov (United States)

    Dovey, Katelyn M; Kemfort, Jordan R; Towne, William F

    2013-06-01

    Honeybees have at least three compass mechanisms: a magnetic compass; a celestial or sun compass, based on the daily rotation of the sun and sun-linked skylight patterns; and a backup celestial compass based on a memory of the sun's movements over time in relation to the landscape. The interactions of these compass systems have yet to be fully elucidated, but the celestial compass is primary in most contexts, the magnetic compass is a backup in certain contexts, and the bees' memory of the sun's course in relation to the landscape is a backup system for cloudy days. Here we ask whether bees have any further compass systems, for example a memory of the sun's movements over time in relation to the magnetic field. To test this, we challenged bees to locate the sun when their known celestial compass systems were unavailable, that is, under overcast skies in unfamiliar landscapes. We measured the bees' knowledge of the sun's location by observing their waggle dances, by which foragers indicate the directions toward food sources in relation to the sun's compass bearing. We found that bees have no celestial compass systems beyond those already known: under overcast skies in unfamiliar landscapes, bees attempt to use their landscape-based backup system to locate the sun, matching the landscapes or skylines at the test sites with those at their natal sites as best they can, even if the matches are poor and yield weak or inconsistent orientation.

  5. FUEL HANDLING FACILITY BACKUP CENTRAL COMMUNICATIONS ROOM SPACE REQUIREMENTS CALCULATION

    International Nuclear Information System (INIS)

    SZALEWSKI, B.

    2005-01-01

    The purpose of the Fuel Handling Facility Backup Central Communications Room Space Requirements Calculation is to determine a preliminary estimate of the space required to house the backup central communications room in the Fuel Handling Facility (FHF). This room provides backup communications capability to the primary communication systems located in the Central Control Center Facility. This calculation will help guide FHF designers in allocating adequate space for communications system equipment in the FHF. This is a preliminary calculation determining preliminary estimates based on the assumptions listed in Section 4. As such, there are currently no limitations on the use of this preliminary calculation. The calculations contained in this document were developed by Design and Engineering and are intended solely for the use of Design and Engineering in its work regarding the FHF Backup Central Communications Room Space Requirements. Yucca Mountain Project personnel from Design and Engineering should be consulted before the use of the calculations for purposes other than those stated herein or use by individuals other than authorized personnel in Design and Engineering

  6. An Informal Survey of the CTI Backup System

    Directory of Open Access Journals (Sweden)

    Joseph Covino

    1981-06-01

    Full Text Available In order to help decide whether or not to purchase computer backup systems from Computer Translation, Inc. (CTI, for use when the CLSI LIBS 100 automated circulation system is not operating, Great Neck Library conducted an informal survey of libraries using both systems

  7. Effective Data Backup System Using Storage Area Network Solution

    African Journals Online (AJOL)

    PROF. OLIVER OSUAGWA

    2015-06-01

    Jun 1, 2015 ... One of the most crucial benefits of the computer system is its ability to manage data send to it for processing. ... mirroring, backup and restore, archival and retrieval of ..... enable schools and cooperate organization create a ...

  8. Effective Data Backup System Using Storage Area Network Solution ...

    African Journals Online (AJOL)

    The primary cause of data loss is lack or non- existent of data backup. Storage Area Network Solution (SANS) is internet-based software which will collect clients data and host them in several locations to forestall data loss in case of disaster in one location. The researcher used adobe Dreamweaver (CSC3) embedded with ...

  9. Upgrading the BEPC control system

    International Nuclear Information System (INIS)

    Yang Liping; Wang Lizheng; Liu Shiyao

    1992-01-01

    The BEPC control system has been put into operation and operated normally since the end of 1987. Three years's experience shows this system can satisfy basically the operation requirements, also exhibits some disadvantages araised from the original centralized system architecture based on the VAX-VCC-CAMAC, such as slow response, bottle neck of VCC, less CPU power for control etc.. This paper describes the method and procedure for upgrading the BEPC control system which will be based on DEC net and DEC-WS, and thus intend to upgrade the control system architecture from the centralized to the distributed and improve the integral system performance. (author)

  10. Reflections on a digital upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tadjalli, M.

    2013-07-01

    Upon receiving US NRC's approval in 2010, the first RPS/ESPS digital upgrade using TELEPERM® XS technology was successfully installed in Spring of 2011 at the first Unit of a three-unit station, followed by the 2nd Unit installation in spring of 2012. Both Units' systems have been operating flawlessly since installation. After about two years of operation, a reflection on digital upgrades and lessons learned, from a vendor perspective, provides valuable insight for the commercial nuclear power industry.

  11. LHCb DAQ network upgrade tests

    CERN Document Server

    Pisani, Flavio

    2013-01-01

    My project concerned the evaluation of new technologies for the DAQ network upgrade of LHCb. The first part consisted in developing and Open Flow-based Clos network. This new technology is very interesting and powerful but, as shown by the results, it still needs further improvements. The second part consisted in testing and benchmarking 40GbE network equipment: Mellanox MT27500, Chelsio T580 and Huawei Cloud Engine 12804. An event-building simulation is currently been performed in order to check the feasibility of the DAQ network upgrade in LS2. The first results are promising.

  12. Human factors design, verification, and validation for two types of control room upgrades at a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Boring, Laurids Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-10-01

    This paper describes the NUREG-0711 based human factors engineering (HFE) phases and associated elements required to support design, verification and validation (V&V), and implementation of a new plant process computer (PPC) and turbine control system (TCS) at a representative nuclear power plant. This paper reviews ways to take a human-system interface (HSI) specification and use it when migrating legacy PPC displays or designing displays with new functionality. These displays undergo iterative usability testing during the design phase and then undergo an integrated system validation (ISV) in a full scope control room training simulator. Following the successful demonstration of operator performance with the systems during the ISV, the new system is implemented at the plant, first in the training simulator and then in the main control room.

  13. Upgrading of refrigeration units in nuclear power plant: An optimized approach to do justice to governmental restrictions

    International Nuclear Information System (INIS)

    Gregor, Klaus; Reinhart, Anton

    1998-01-01

    Stringent regulations to reduce the use of chlorofluorocarbons (CFC) and halogenated chlorofluorocarbons (HCFC) have been set into force by many European countries. A ban for new plants containing HCFCs in 2005 and a total ban of HCFCs in 2020 are discussed within the European Community. Siemens-KWU and Sulzer Escher Wyss have developed a well-proofed procedure to solve the CFC problem for existing refrigeration systems in nuclear power plants. The new refrigerants are fluorinated hydrocarbons and for the centrifugal water chiller R134a is best suited. Prior to the market introduction toxicity, short and long term health effects, inflammability and stability of R134a have been investigated. The mechanical examination included wear, corrosion, lubrication and resistance to decomposition. A well-proven procedure was established which ensures the owner of the plant and the supplier best results

  14. Energy Efficiency Upgrades for the Clinic and the Tannery and Wind Energy for Power to the Tannery

    Energy Technology Data Exchange (ETDEWEB)

    Kakoona, Jane [Native Village of Shishmaref, AK (United States); Fredenberg, Connie [Native Village of Shishmaref, AK (United States)

    2017-05-08

    Under this grant agreement, the Native Village of Shishmaref (Shishmaref) will complete weatherization retrofits to two community buildings, the Clinic and the Tannery, based on recent energy audits. Located 5 miles from the mainland, 126 miles north of Nome and 100 miles south of Kotzebue, Shishmaref sits on Sarichef Island in the Chukchi Sea. As such, Shishmaref experiences a transitional climate between the frozen Arctic and the continental Interior. Summers can be foggy, with average temperatures ranging from 47 to 54 °F (Fahrenheit); winter temperatures average -12 to 2 °F. With heating fuel costs of almost $7/gallon, the goal of this project is to reduce energy costs at the Clinic and the Tannery by at least 30 to 50% through energy efficiency and weatherization measures and through the installation of a residential-size wind turbine to supplement power for the Tannery building.

  15. Human factors design, verification, and validation for two types of control room upgrades at a nuclear power plant

    International Nuclear Information System (INIS)

    Boring, Laurids Ronald

    2014-01-01

    This paper describes the NUREG-0711 based human factors engineering (HFE) phases and associated elements required to support design, verification and validation (V&V), and implementation of a new plant process computer (PPC) and turbine control system (TCS) at a representative nuclear power plant. This paper reviews ways to take a human-system interface (HSI) specification and use it when migrating legacy PPC displays or designing displays with new functionality. These displays undergo iterative usability testing during the design phase and then undergo an integrated system validation (ISV) in a full scope control room training simulator. Following the successful demonstration of operator performance with the systems during the ISV, the new system is implemented at the plant, first in the training simulator and then in the main control room.

  16. Acceptance test report 2721-Z upgrades

    International Nuclear Information System (INIS)

    Keck, R.D.

    1998-01-01

    This test procedure provides instructions for acceptance testing of modifications to the 2721-Z diesel-generator system made by Project C-189. The modifications include (1) replacing the generator NUMA-LOGIC controller with connection to the PFP distributed control system (DCS), (2) replacing ATSI with a breaker switching scheme for 2736-ZB backup power and (3) providing a method for generator load and system testing

  17. Physical protection upgrades in Ukraine

    International Nuclear Information System (INIS)

    Djakov, A.

    1998-01-01

    The U.S. DOE is providing nuclear material safeguards assistance in both material control and accountability and in physical protection to several facilities in Ukraine. This paper summarizes the types of physical protection upgrades that have been or are presently being implemented at these facilities. These facilities include the Kiev Institute for Nuclear Research, Kharkov Institute of Physics and Technology, Sevastopol Institute of Nuclear Energy and Industry, and the South Ukraine Nuclear Power Plant. Typical upgrades include: hardening of storage areas; improvements in access control, intrusion detection, and CCTV assessment; central alarm station improvements; and implementation of new voice communication systems. Methods used to implement these upgrades and problems encountered are discussed. Training issues are also discussed

  18. Recovery Act. Tapoco project. Cheoah upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tran, Paul [Alcoa Inc., Alcoa Center, PA (United States)

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  19. Safety upgrades of NPPs in Slovakia

    International Nuclear Information System (INIS)

    Ziakova, M.

    2013-01-01

    In this presentation Mrs. Marta Ziakova (Chairperson od Nuclear Regulatory Authority of the Slovak Republic) deals with the safety upgrades of nuclear power plants and radioactive wastes technologies in the Slovak Republic. Safety improvement activities are reviewed.

  20. A SWOT Analysis of the Various Backup Scenarios Used in Electronic Medical Record Systems.

    Science.gov (United States)

    Seo, Hwa Jeong; Kim, Hye Hyeon; Kim, Ju Han

    2011-09-01

    Electronic medical records (EMRs) are increasingly being used by health care services. Currently, if an EMR shutdown occurs, even for a moment, patient safety and care can be seriously impacted. Our goal was to determine the methodology needed to develop an effective and reliable EMR backup system. Our "independent backup system by medical organizations" paradigm implies that individual medical organizations develop their own EMR backup systems within their organizations. A "personal independent backup system" is defined as an individual privately managing his/her own medical records, whereas in a "central backup system by the government" the government controls all the data. A "central backup system by private enterprises" implies that individual companies retain control over their own data. A "cooperative backup system among medical organizations" refers to a networked system established through mutual agreement. The "backup system based on mutual trust between an individual and an organization" means that the medical information backup system at the organizational level is established through mutual trust. Through the use of SWOT analysis it can be shown that cooperative backup among medical organizations is possible to be established through a network composed of various medical agencies and that it can be managed systematically. An owner of medical information only grants data access to the specific person who gave the authorization for backup based on the mutual trust between an individual and an organization. By employing SWOT analysis, we concluded that a linkage among medical organizations or between an individual and an organization can provide an efficient backup system.

  1. The TACIS Nuclear Programme: Assistance in Upgrading Russian Nuclear Power Stations - An Overview of the Individual Projects in the Internet

    International Nuclear Information System (INIS)

    Bieth, Michel; Schoels, Hubert

    2006-01-01

    The European Union' TACIS1 programme has been established for the New Independent States (NIS), among them in the Russian Federation since 1991. One priority of TACIS funding is Nuclear Safety. The European Commission has made available a total of 944 Million Euros for nuclear safety programmes covering the period 1991-2003. The TACIS nuclear safety programme is devoted to the improvement of the safety of Soviet designed nuclear installations in providing technology and safety culture transfer. JRC is carrying out works in the following areas: On-Site Assistance for TACIS operating Nuclear Power Plants; Design Safety and Dissemination of TACIS results; Reactor Pressure Vessel Embrittlement for VVER; Regulatory Assistance; Industrial Waste Management; Nuclear Safeguards; All TACIS projects, dealing with these areas of activity are now available in so called Project Description Sheets (PDS) or Project Results Sheets (PRS) in the Internet for everybody. JRC has created in the Internet an easy to open and to browse database which contains the result of works in relation to the above mentioned nuclear activities. This presentation gives an on-line overview of the app. 430 projects which have been implemented so far since the outset of the TACIS Nuclear Programme in the Russian Federation, which is representative to the other CIS countries, benefiting from the TACIS. The presentation will mainly consist of an on-line-demonstration of the TACIS Nuclear WEB Page, created by JRC. (authors)

  2. A strategy for upgrading management of spent fuel and radioactive waste at the Ignalina nuclear power plant

    International Nuclear Information System (INIS)

    Balan, V.; Penkov, V.; Bergman, C.; Gustafsson, B.

    2001-01-01

    The waste management strategy of the former Soviet Union, based on its Norms and Rules, was implemented at Ignalina nuclear power Plant (INPP). This means in brief that the spent nuclear fuel (SNF) should be reprocessed in the Soviet Union and the management of radioactive waste should be done in connection with the eventual decommissioning of the reactors, The major facilities for management of radioactive waste were evaporation of liquid waste and subsequent bitumenisation of the sludge, treatment of liquid with ion-exchange techniques and subsequent storage of the resins in tanks. Solid waste was sorted according to its activity content and stored on site. Following the independence of Lithuania in 1990, Lithuania is successively replacing the former Norms and Rules with Lithuanian laws and regulations. Lithuania has signed both the Convention of Nuclear Safety and the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. The paper will give an overview of the work done, in progress and planned, primarily from an operational point of view. It will give examples of practical problems which have to be overcome and how very tough prioritisation has to be made because of lack of resources. Many of the problems are associated with the fact that the waste management strategy successively has to be changed at the same time as the generation of SNF and radioactive waste is continued. A lot has already been achieved, especially regarding the SNF. However, the main work is still to be done until the INPP can declare that its waste is properly managed in full compliance with a national waste management strategy which eventually will end with the disposal in licensed repositories. (author)

  3. AC power supply systems

    International Nuclear Information System (INIS)

    Law, H.

    1987-01-01

    An ac power supply system includes a rectifier fed by a normal ac supply, and an inverter connected to the rectifier by a dc link, the inverter being effective to invert the dc output of the receiver at a required frequency to provide an ac output. A dc backup power supply of lower voltage than the normal dc output of the rectifier is connected across the dc link such that the ac output of the rectifier is derived from the backup supply if the voltage of the output of the inverter falls below that of the backup supply. The dc backup power may be derived from a backup ac supply. Use in pumping coolant in nuclear reactor is envisaged. (author)

  4. ISTTOK control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Ivo S., E-mail: ivoc@ipfn.ist.utl.pt; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-10-15

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel{sup ®} Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators.

  5. ISTTOK control system upgrade

    International Nuclear Information System (INIS)

    Carvalho, Ivo S.; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-01-01

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel ® Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators

  6. Integration of multiple, excess, backup, and expected covering models

    OpenAIRE

    M S Daskin; K Hogan; C ReVelle

    1988-01-01

    The concepts of multiple, excess, backup, and expected coverage are defined. Model formulations using these constructs are reviewed and contrasted to illustrate the relationships between them. Several new formulations are presented as is a new derivation of the expected covering model which indicates more clearly the relationship of the model to other multi-state covering models. An expected covering model with multiple time standards is also presented.

  7. A hybrid data compression approach for online backup service

    Science.gov (United States)

    Wang, Hua; Zhou, Ke; Qin, MingKang

    2009-08-01

    With the popularity of Saas (Software as a service), backup service has becoming a hot topic of storage application. Due to the numerous backup users, how to reduce the massive data load is a key problem for system designer. Data compression provides a good solution. Traditional data compression application used to adopt a single method, which has limitations in some respects. For example data stream compression can only realize intra-file compression, de-duplication is used to eliminate inter-file redundant data, compression efficiency cannot meet the need of backup service software. This paper proposes a novel hybrid compression approach, which includes two levels: global compression and block compression. The former can eliminate redundant inter-file copies across different users, the latter adopts data stream compression technology to realize intra-file de-duplication. Several compressing algorithms were adopted to measure the compression ratio and CPU time. Adaptability using different algorithm in certain situation is also analyzed. The performance analysis shows that great improvement is made through the hybrid compression policy.

  8. TCV divertor upgrade for alternative magnetic configurations

    Directory of Open Access Journals (Sweden)

    H. Reimerdes

    2017-08-01

    Full Text Available The Swiss Plasma Center (SPC is planning a divertor upgrade for the TCV tokamak. The upgrade aims at extending the research of conventional and alternative divertor configurations to operational scenarios and divertor regimes of greater relevance for a fusion reactor. The main elements of the upgrade are the installation of an in-vessel structure to form a divertor chamber of variable closure and enhanced diagnostic capabilities, an increase of the pumping capability of the divertor chamber and the addition of new divertor poloidal field coils. The project follows a staged approach and is carried out in parallel with an upgrade of the TCV heating system. First calculations using the EMC3-Eirene code indicate that realistic baffles together with the planned heating upgrade will allow for a significantly higher compression of neutral particles in the divertor, which is a prerequisite to test the power dissipation potential of various divertor configurations.

  9. Estimating the Backup Reaction Wheel Orientation Using Reaction Wheel Spin Rates Flight Telemetry from a Spacecraft

    Science.gov (United States)

    Rizvi, Farheen

    2013-01-01

    A report describes a model that estimates the orientation of the backup reaction wheel using the reaction wheel spin rates telemetry from a spacecraft. Attitude control via the reaction wheel assembly (RWA) onboard a spacecraft uses three reaction wheels (one wheel per axis) and a backup to accommodate any wheel degradation throughout the course of the mission. The spacecraft dynamics prediction depends upon the correct knowledge of the reaction wheel orientations. Thus, it is vital to determine the actual orientation of the reaction wheels such that the correct spacecraft dynamics can be predicted. The conservation of angular momentum is used to estimate the orientation of the backup reaction wheel from the prime and backup reaction wheel spin rates data. The method is applied in estimating the orientation of the backup wheel onboard the Cassini spacecraft. The flight telemetry from the March 2011 prime and backup RWA swap activity on Cassini is used to obtain the best estimate for the backup reaction wheel orientation.

  10. An FPGA based backup version of the TileCal digitizer

    International Nuclear Information System (INIS)

    Eriksson, D; Muschter, S; Bohm, C

    2010-01-01

    The ATLAS Tile Calorimeter front end digitization and readout system comprises about 1800 digitizer boards with two TileDMU ASICs on each board. The TileDMUs are responsible for storing, derandomising and reading out digitized data from twelve ADCs. An ample number of board spares are available. However, a backup solution is desirable in the event of unexpected failure modes. The original version contains both outdated and custom made circuits that are difficult or impossible to find in sufficient numbers. We have developed a new version using inexpensive off the shelf FPGAs (Spartan 6). The FPGAs have all the necessary functionality to emulate the TileDMU and will be readily available for a considerable time. The new board is functionally compatible with the current version and to a large extent uses the same code. The design goal was to leave the digitizer design as intact as possible since it is well tested and performs well. As radiation tolerance is an issue we have implemented triple mode redundancy in the FPGA. To further improve the system we added in system programmability via TTCrx for both the FPGA and the configuration memory using one way JTAG. This provides a way to recover from radiation damage to the configuration PROM or to remotely upgrade system firmware.

  11. An FPGA based backup version of the TileCal digitizer.

    Science.gov (United States)

    Eriksson, D.; Muschter, S.; Bohm, C.

    2010-11-01

    The ATLAS Tile Calorimeter front end digitization and readout system comprises about 1800 digitizer boards with two TileDMU ASICs on each board. The TileDMUs are responsible for storing, derandomising and reading out digitized data from twelve ADCs. An ample number of board spares are available. However, a backup solution is desirable in the event of unexpected failure modes. The original version contains both outdated and custom made circuits that are difficult or impossible to find in sufficient numbers. We have developed a new version using inexpensive off the shelf FPGAs (Spartan 6). The FPGAs have all the necessary functionality to emulate the TileDMU and will be readily available for a considerable time. The new board is functionally compatible with the current version and to a large extent uses the same code. The design goal was to leave the digitizer design as intact as possible since it is well tested and performs well. As radiation tolerance is an issue we have implemented triple mode redundancy in the FPGA. To further improve the system we added in system programmability via TTCrx for both the FPGA and the configuration memory using one way JTAG. This provides a way to recover from radiation damage to the configuration PROM or to remotely upgrade system firmware.

  12. Backup of Renewable Energy for an Electrical Island: Case Study of Israeli Electricity System—Current Status

    Science.gov (United States)

    Fakhouri, A.; Kuperman, A.

    2014-01-01

    The paper focuses on the quantitative analysis of Israeli Government's targets of 10% renewable energy penetration by 2020 and determining the desired methodology (models) for assessing the effects on the electricity market, addressing the fact that Israel is an electricity island. The main objective is to determine the influence of achieving the Government's goals for renewable energy penetration on the need for backup in the Israeli electricity system. This work presents the current situation of the Israeli electricity market and the study to be taken in order to assess the undesirable effects resulting from the intermittency of electricity generated by wind and solar power stations as well as presents some solutions to mitigating these phenomena. Future work will focus on a quantitative analysis of model runs and determine the amounts of backup required relative to the amount of installed capacity from renewable resources. PMID:24624044

  13. Backup of renewable energy for an electrical island: case study of Israeli electricity system--current status.

    Science.gov (United States)

    Fakhouri, A; Kuperman, A

    2014-01-01

    The paper focuses on the quantitative analysis of Israeli Government's targets of 10% renewable energy penetration by 2020 and determining the desired methodology (models) for assessing the effects on the electricity market, addressing the fact that Israel is an electricity island. The main objective is to determine the influence of achieving the Government's goals for renewable energy penetration on the need for backup in the Israeli electricity system. This work presents the current situation of the Israeli electricity market and the study to be taken in order to assess the undesirable effects resulting from the intermittency of electricity generated by wind and solar power stations as well as presents some solutions to mitigating these phenomena. Future work will focus on a quantitative analysis of model runs and determine the amounts of backup required relative to the amount of installed capacity from renewable resources.

  14. Upgrading Ukraine's nuclear power plants

    International Nuclear Information System (INIS)

    Tkhorzhevskyy, O.

    2001-01-01

    In the article the description of the historical process of Ukrainian NPP modernization is presented. The existed procedure of modernization implementation is described in details. The main features of this procedure are illustrated by several examples, such as ECCS sumps, improvements of hydrogen recombination system and development of RPS control rod revision program. (author)

  15. Safety and upgrading of nuclear power plants with WWER-440/V-230; Voprosy bezopasnosti i modernizatsii AEhS s WWER-440 (V-230)

    Energy Technology Data Exchange (ETDEWEB)

    Melnikov, N [Opytno-Konstruktorskoe Byuro Gidropress, Podol` sk (Russian Federation)

    1996-12-31

    Modernization of WWER-440/V-230 reactors is considered according to the WANO project `Proposal for reconstruction of WWER-440/V-230 reactors` (1990). The main technical measures to be taken relate to: 1. Expanding the considered spectrum of design basis accidents; 2. Provision of first loop integrity; 3. Safety system structure and components reliability enhancement; 4. Reduction o initiating events probability; 5. Enhancement of hermeticity and integrity of the area surrounding the first loop; 6. Fire fighting system upgrade; 7. Radiation control system upgrade; 8. Provision of seismic resistance. Details of the recommended technical steps for some NPPs are presented. 1 tab.

  16. AliPDU Package Upgrade

    CERN Document Server

    "Martin, Michael

    2015-01-01

    "AliPDU Package" is a set of script, panels, and datapoints designed in WinCC to manage and monitor PDU's. PDU is an essential component in the data center, in order to make data center working properly through the monitoring of power distribution and environmental condition of the data center. In this project "AliPDU Package" is upgraded so it can be used to monitor environmental condition of data center using PDU's and external environmental sensor connected to PDU.

  17. AliPDU Package Upgrade

    CERN Document Server

    Martin, Michael

    2015-01-01

    AliPDU Package is a set of script, panels, and datapoints designed in WinCC to manage and monitor PDU's. PDU is an essential component in the data center, in order to make data center working properly through the monitoring of power distribution and environmental condition of the data center. In this project "AliPDU Package" is upgraded so it can be used to monitor environmental condition of data center using PDU's and external environmental sensor connected to PDU.

  18. Five TWh saved on profitable upgrading

    International Nuclear Information System (INIS)

    Bakken, Stein Arne.

    1999-01-01

    Article. In Norway, a project is planned to evaluate the upgrading potential of the hydroelectric power sector. The article criticizes the authorities for not supporting the upgrading of hydroelectric power plants in their eager to promote the development of wind power. An important contribution of the planned project will be a book from which the utilities may get advice on measures of upgrading. Generators and control systems account for 80% of the faults and interruptions in the power utilities. The turbine technology has made important progress in the 1990s. By pure upgrading measures alone, the turbine efficiencies may be increased enough for an additional 3 TWh to be taken out from the Norwegian hydroelectric power system. Today, the price of imported carbon-based Danish power determines whether the utilities find it profitable to rehabilitate the hydroelectric plants. The energy potential of upgrading is estimated to be 5 TWh. This energy can be generated with known technology and with no serious consequences for the environment

  19. Heuristic methods for shared backup path protection planning

    DEFF Research Database (Denmark)

    Haahr, Jørgen Thorlund; Stidsen, Thomas Riis; Zachariasen, Martin

    2012-01-01

    schemes are employed. In contrast to manual intervention, automatic protection schemes such as Shared Backup Path Protection (SBPP) can recover from failure quickly and efficiently. SBPP is a simple but efficient protection scheme that can be implemented in backbone networks with technology available...... present heuristic algorithms and lower bound methods for the SBPP planning problem. Experimental results show that the heuristic algorithms are able to find good quality solutions in minutes. A solution gap of less than 3.5% was achieved for more than half of the benchmark instances (and a gap of less...

  20. Heuristic methods for single link shared backup path protection

    DEFF Research Database (Denmark)

    Haahr, Jørgen Thorlund; Stidsen, Thomas Riis; Zachariasen, Martin

    2014-01-01

    schemes are employed. In contrast to manual intervention, automatic protection schemes such as shared backup path protection (SBPP) can recover from failure quickly and efficiently. SBPP is a simple but efficient protection scheme that can be implemented in backbone networks with technology available...... heuristic algorithms and lower bound methods for the SBPP planning problem. Experimental results show that the heuristic algorithms are able to find good quality solutions in minutes. A solution gap of less than 3.5 % was achieved for 5 of 7 benchmark instances (and a gap of less than 11 % for the remaining...

  1. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  2. Effectiveness of Backup and Disaster Recovery in Cloud : A Comparative study on Disk and Cloud based Backup and Disaster Recovery

    OpenAIRE

    Kaveti, Akash

    2015-01-01

    Context: Definitive information is what makes enterprises in the contemporary world continuously move up the ladder in today’s world. Hence they need to be always up to date with the latest advancements. A key point in the enterprise structure is Backup and Disaster Recovery, DR system and this has very high scope for development since it can be integrated with a lot of our daily requirements. On account of this, it has a lot of applicability in future for development of technology. Due to th...

  3. Simulating cloud environment for HIS backup using secret sharing.

    Science.gov (United States)

    Kuroda, Tomohiro; Kimura, Eizen; Matsumura, Yasushi; Yamashita, Yoshinori; Hiramatsu, Haruhiko; Kume, Naoto

    2013-01-01

    In the face of a disaster hospitals are expected to be able to continue providing efficient and high-quality care to patients. It is therefore crucial for hospitals to develop business continuity plans (BCPs) that identify their vulnerabilities, and prepare procedures to overcome them. A key aspect of most hospitals' BCPs is creating the backup of the hospital information system (HIS) data at multiple remote sites. However, the need to keep the data confidential dramatically increases the costs of making such backups. Secret sharing is a method to split an original secret message so that individual pieces are meaningless, but putting sufficient number of pieces together reveals the original message. It allows creation of pseudo-redundant arrays of independent disks for privacy-sensitive data over the Internet. We developed a secret sharing environment for StarBED, a large-scale network experiment environment, and evaluated its potential and performance during disaster recovery. Simulation results showed that the entire main HIS database of Kyoto University Hospital could be retrieved within three days even if one of the distributed storage systems crashed during a disaster.

  4. The amino acid's backup bone - storage solutions for proteomics facilities.

    Science.gov (United States)

    Meckel, Hagen; Stephan, Christian; Bunse, Christian; Krafzik, Michael; Reher, Christopher; Kohl, Michael; Meyer, Helmut Erich; Eisenacher, Martin

    2014-01-01

    Proteomics methods, especially high-throughput mass spectrometry analysis have been continually developed and improved over the years. The analysis of complex biological samples produces large volumes of raw data. Data storage and recovery management pose substantial challenges to biomedical or proteomic facilities regarding backup and archiving concepts as well as hardware requirements. In this article we describe differences between the terms backup and archive with regard to manual and automatic approaches. We also introduce different storage concepts and technologies from transportable media to professional solutions such as redundant array of independent disks (RAID) systems, network attached storages (NAS) and storage area network (SAN). Moreover, we present a software solution, which we developed for the purpose of long-term preservation of large mass spectrometry raw data files on an object storage device (OSD) archiving system. Finally, advantages, disadvantages, and experiences from routine operations of the presented concepts and technologies are evaluated and discussed. This article is part of a Special Issue entitled: Computational Proteomics in the Post-Identification Era. Guest Editors: Martin Eisenacher and Christian Stephan. Copyright © 2013. Published by Elsevier B.V.

  5. MAST Upgrade – Construction Status

    Energy Technology Data Exchange (ETDEWEB)

    Milnes, Joe, E-mail: Joe.Milnes@ccfe.ac.uk; Ayed, Nizar Ben; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O’Gorman, Tom; Scannell, Rory

    2015-10-15

    Highlights: • Outlines unique capability of MAST-U, including divertor and diagnostic capability. • Describes progress made in the manufacture and assembly of key MAST-U components. • Highlights the design challenges that have been overcome. • Lists the key lessons learned thus far in the project. - Abstract: The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: (1) testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); (2) adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and (3) exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progress in delivering the upgraded diagnostic capability, the modification and upgrading of the NBI heating systems and the complete overhaul of the machine control infrastructure, including a new control room with full remote participation facilities.

  6. Safety upgrading of Bohunice V1 NPP

    International Nuclear Information System (INIS)

    2001-01-01

    This CD is multimedia presentation of programme safety upgrading of Bohunice V1 NPP. It consist of next chapters: (1) Introductory speeches; (2) Nuclear power plant WWER 440; (3) Safety improvement; (4) Bohunice Nuclear power plants subsidiary; (5) Siemens; (6) REKON; (7) VUJE Trnava, Inc. - Engineering, Design and Research Organisation; (8) Album

  7. Instrumentation and control upgrade evaluation methodology: Final report. Volume 2: Workbook

    Energy Technology Data Exchange (ETDEWEB)

    Bliss, M.; Brown, E.; Florio, F.; Stofko, M.

    1996-07-01

    This workbook accompanies the methodology manual (EPRI TR-104963-V1) which describes how to develop an Upgrade Evaluation Report (UER). A UER is an evaluation that is performed by a nuclear power plant to decide the most cost-effective upgrade to perform (if any) for a previously identified Upgrade Candidate System. A UER defines the utility`s mission and objectives in regards to upgrade candidates, as well as the systems initial costs, benefits to each upgrade, and an initial upgrade schedule to cost-effectively implement system upgrades.

  8. Upgrading uncompetitive products economically

    DEFF Research Database (Denmark)

    Lu, Hua; Jensen, Christian Søndergaard

    2012-01-01

    for upgrading an uncompetitive product, and combine the solutions into a single solution. We also propose a spatial join-based solution that assumes P and T are indexed by an R-tree. Given a set of products in the same R-tree node, we derive three lower bounds on their upgrading costs. These bounds are employed...

  9. A kernel plus method for quantifying wind turbine performance upgrades

    KAUST Repository

    Lee, Giwhyun; Ding, Yu; Xie, Le; Genton, Marc G.

    2014-01-01

    Power curves are commonly estimated using the binning method recommended by the International Electrotechnical Commission, which primarily incorporates wind speed information. When such power curves are used to quantify a turbine's upgrade

  10. Original seismic and similar severe external loading design basis for WWER type nuclear power plants in Czech and Slovak Republics and actual issues of their upgrading

    International Nuclear Information System (INIS)

    Masopust, R.

    1993-01-01

    The WWER type NPPs located in Czech and Slovak republics have many seismic vulnerabilities similar to those recognized in many of the US NPPs prior to late seventies. They are mostly caused by underestimation of these problems in the design phases, sometimes due to inadequate performance and poor quality of works and some incompatibilities between the original Russian design and current international design bases and safety requirements. It is believed that the structures and equipment of these NPPs can be seismically upgraded at a moderate cost. It is also believed that the IAEA Benchmark study for seismic analysis and testing of WWER NPPs will develop recommendations to effective seismic upgrading of the existing plants

  11. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, Susila; Tang, Y.N.

    1994-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans. ((orig.))

  12. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans

  13. CANDU Digital Control Computer upgrade options

    International Nuclear Information System (INIS)

    De Jong, M.S.; De Grosbois, J.; Qian, T.

    1997-01-01

    This paper reviews the evolution of Digital Control Computers (DCC) in CANDU power plants to the present day. Much of this evolution has been to meeting changing control or display requirements as well as the replacement of obsolete, or old and less reliable technology with better equipment that is now available. The current work at AECL and Canadian utilities to investigate DCC upgrade options, alternatives, and strategies are examined. The dependence of a particular upgrade strategy on the overall plant refurbishment plans are also discussed. Presently, the upgrade options range from replacement of individual obsolete system components, to replacement of the entire DCC hardware without changing the software, to complete replacement of the DCCs with a functionally equivalent system using new control computer equipment and software. Key issues, constraints and objectives associated with these DCC upgrade options are highlighted. (author)

  14. To upgrade or not to upgrade

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn; Rose, Jørgen

    2017-01-01

    This paper identifies the key indicators that owners need to take into account in order to choose the most affordable extent of upgrading of a typical post-1945 building. The exterior look of the building is not to be changed. Indicators include measures, risk assessment related to the changes in...

  15. Superhilac upgrade project

    International Nuclear Information System (INIS)

    Feinberg, B.; Brown, I.G.

    1985-05-01

    This project will increase the uranium output of the Bevalac heavy-ion facility from the currently available 10 7 to 5 x 10 7 ions/pulse, allowing accurate Lamb shift measurements to be made in U 90+ and U 91+ with important applications to the testing of quantum electrodynamics and the development of an x-ray laser. The injected beam intensity will be increased to make better use of the 10emA output space-charge limit of the Wideroe linac. Components will include a new high current MEtal Vapor Vacuum Arc (MEVVA) ion source along with an improved high current, high voltage Cockcroft-Walton power supply to handle the increased beam current. The Low Energy Beam Transport (LEBT) line will be upgraded with additional focusing to manage the increased space-charge forces and with an improved vacuum to reduce charge exchange losses. Finally, the phase matching between the 23MHz Wideroe linac and the 70MHz Alvarez linac will be improved by the addition of the appropriate buncher cavities. Physics design is underway and detailed engineering is scheduled to begin in October 1985, with installation slated for the 1986 summer shutdown

  16. Development of an ADC Radiation Tolerance Characterization System for the Upgrade of the ATLAS LAr Calorimeter

    CERN Document Server

    INSPIRE-00445642; Chen, Kai; Kierstead, James; Lanni, Francesco; Takai, Helio; Jin, Ge

    2016-01-01

    ATLAS LAr calorimeter will perform its Phase-I upgrade during the long shut down (LS2) in 2018, a new LAr Trigger Digitizer Board (LTDB) will be designed and installed. Several commercial-off-the-shelf (COTS) multichannel high-speed ADCs have been selected as possible backups of the radiation tolerant ADC ASICs for LTDB. In order to evaluate the radiation tolerance of these back up commercial ADCs, we developed an ADC radiation tolerance characterization system, which includes the ADC boards, data acquisition (DAQ) board, signal generator, external power supplies and a host computer. The ADC board is custom designed for different ADCs, which has ADC driver and clock distribution circuits integrated on board. The Xilinx ZC706 FPGA development board is used as DAQ board. The data from ADC are routed to the FPGA through the FMC (FPGA Mezzanine Card) connector, de-serialized and monitored by the FPGA, and then transmitted to the host computer through the Gigabit Ethernet. A software program has been developed wit...

  17. Upgrading during difficult times

    International Nuclear Information System (INIS)

    Tiefenbach, K.

    1993-01-01

    The Co-op Upgrader is part of an integrated refinery and upgrader complex in Regina, Saskatchewan. The upgrader processes 50,000 bbl/d heavy sour crude oil, mostly Fosterton and dilute Lloydminster crude, via hydrogen addition and carbon rejection, desulfurization, demetallization, and denitrification to yield a synthetic crude blend. The synthetic crude is refined to produce gasoline and diesel fuel. Byproducts from the integrated operation include 100,000 tonnes/y of petroleum coke, 65,000 tonnes/y of sulfur, propane, butane, fuel oil, and metals (Ni and V) in the form of spent catalysts. Recent operational and economic challenges faced by the upgrader are reviewed. Technical challenges include operating the upgrader's high-temperature high-pressure heavy oil hydrotreating unit and distillate hydrogenation unit, removal and replacement of the desulfurization catalyst, waste management, and producing coke of sufficient quality. Economic challenges include the shrinking differential between light and heavy oil, higher prices for natural gas (the main raw material for hydrogen production for upgrading), seasonal changes in product specifications, and lower prices for sulfur and metal byproducts. The upgrader is also affected by interest rates since borrowing costs are the single largest expenditure after crude oil purchases. 4 figs

  18. RELAP5-3D Resolution of Known Restart/Backup Issues

    Energy Technology Data Exchange (ETDEWEB)

    Mesina, George L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Anderson, Nolan A. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-12-01

    The state-of-the-art nuclear reactor system safety analysis computer program developed at the Idaho National Laboratory (INL), RELAP5-3D, continues to adapt to changes in computer hardware and software and to develop to meet the ever-expanding needs of the nuclear industry. To continue at the forefront, code testing must evolve with both code and industry developments, and it must work correctly. To best ensure this, the processes of Software Verification and Validation (V&V) are applied. Verification compares coding against its documented algorithms and equations and compares its calculations against analytical solutions and the method of manufactured solutions. A form of this, sequential verification, checks code specifications against coding only when originally written then applies regression testing which compares code calculations between consecutive updates or versions on a set of test cases to check that the performance does not change. A sequential verification testing system was specially constructed for RELAP5-3D to both detect errors with extreme accuracy and cover all nuclear-plant-relevant code features. Detection is provided through a “verification file” that records double precision sums of key variables. Coverage is provided by a test suite of input decks that exercise code features and capabilities necessary to model a nuclear power plant. A matrix of test features and short-running cases that exercise them is presented. This testing system is used to test base cases (called null testing) as well as restart and backup cases. It can test RELAP5-3D performance in both standalone and coupled (through PVM to other codes) runs. Application of verification testing revealed numerous restart and backup issues in both standalone and couple modes. This document reports the resolution of these issues.

  19. 30 CFR 75.1101-9 - Back-up water system.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Back-up water system. 75.1101-9 Section 75.1101-9 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1101-9 Back-up water system...

  20. Models for dynamic analysis of backup ball bearings of an AMB-system

    Science.gov (United States)

    Halminen, Oskari; Aceituno, Javier F.; Escalona, José L.; Sopanen, Jussi; Mikkola, Aki

    2017-10-01

    Two detailed models of backup bearing are introduced for dynamic analysis of the dropdown event of a rotor supported by an active magnetic bearing (AMB). The proposed two-dimensional models of the backup bearings are based on a multibody approach. All parts of the bearing are modeled as rigid bodies with geometrical surfaces and the bodies interact with each other through contact forces. The first model describes a backup bearing without a cage, and the second model describes a backup bearing with a cage. The introduced models, which incorporate a realistic elastic contact model, are compared with previously presented simplified models through parametric study. In order to ensure the durability of backup bearings in challenging applications where ball bearings with an oversized bore are necessary, analysis of the forces affecting the bearing's cage and balls is required, and the models introduced in this work assist in this task as they enable optimal properties for the bearing's cage and balls to be found.

  1. The LHCb Muon Upgrade

    CERN Multimedia

    Cardini, A

    2013-01-01

    The LHCb collaboration is currently working on the upgrade of the experiment to allow, after 2018, an efficient data collection while running at an instantaneous luminosity of 2x10$^{33}$/cm$^{-2}$s$^{-1}$. The upgrade will allow 40 MHz detector readout, and events will be selected by means of a very flexible software-based trigger. The muon system will be upgraded in two phases. In the first phase, the off-detector readout electronics will be redesigned to allow complete event readout at 40 MHz. Also, part of the channel logical-ORs, used to reduce the total readout channel count, will be removed to reduce dead-time in critical regions. In a second phase, higher-granularity detectors will replace the ones installed in highly irradiated regions, to guarantee efficient muon system performances in the upgrade data taking conditions.

  2. Bi-Provincial Upgrader

    International Nuclear Information System (INIS)

    1997-01-01

    Husky Oil's Bi-Provincial Upgrader is located in the rural municipality of Wilton, east of Lloydminster, Saskatchewan. It is jointly owned by Husky Oil and the Saskatchewan government. The upgrader is designed to produce 7.300 m 3 /cd of synthetic crude from 8.440 m 3 /cd of diluted Lloyd blend and distillates from the existing Lloydminster refinery. The designed coke and sulphur production is 415 t/day and 240 t/day respectively. Chronology of the Bi-Provincial Upgrader project was presented, along with details of the heavy oil feedstock properties for Cold Lake, Lloydminster and Lloyd Blend. Upgrader production history since start-up, synthetic crude oil customers, and the evolution of prices for Edmonton light vs. Husky LLB at Hardisty were also reviewed. 3 tabs., 9 figs

  3. LEP is upgraded

    CERN Multimedia

    1995-01-01

    A superconducting radio-frequency cavity is installed on the Large Electron-Positron (LEP) collider. This upgrade, known as LEP-2, allowed the accelerator to reach new, higher energies and so investigate new areas of physics.

  4. LHC Status and Upgrade Challenges

    Science.gov (United States)

    Smith, Jeffrey

    2009-11-01

    The Large Hadron Collider has had a trying start-up and a challenging operational future lays ahead. Critical to the machine's performance is controlling a beam of particles whose stored energy is equivalent to 80 kg of TNT. Unavoidable beam losses result in energy deposition throughout the machine and without adequate protection this power would result in quenching of the superconducting magnets. A brief overview of the machine layout and principles of operation will be reviewed including a summary of the September 2008 accident. The current status of the LHC, startup schedule and upgrade options to achieve the target luminosity will be presented.

  5. ECRH experiments in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Leuterer, F.; Guenter, S.; Hobirk, J.; Kirov, K.; Ryter, F.; Wolf, R.; Zohm, H.; Gantenbein, G.

    2001-01-01

    In ASDEX Upgrade ECRH and ECCD with a power of up to 2 MW has been used. With counter ECCD in discharges with an internal transport barrier we achieved an electron temperature of ≅13 keV. In low density ohmic plasmas we obtained an rf driven current of ≅80% both in co- and counter directions. Neoclassical tearing modes have been completly stabilised by driving a current on the resonant q-surface. Electron heat transport has been studied in standard L- and H-mode plasmas and can be described by a dependence on a critical electron temperature gradient

  6. Experiences in controlling the upgrading of TRIGA 2000 Bandung reactor

    International Nuclear Information System (INIS)

    Huda, K.; Wibowo, Y.W.; Suprawhardana, M.S.

    2001-01-01

    TRIGA 2000 Bandung Reactor was established in 1961 for research, education and isotope production purposes. The reactor reached its first criticality in October 1964 and operated at nominal power of 250 kW until 1971. In 1971 the reactor was upgraded to the power level of 1000 kW. In order to raise the capacity of isotope production, the reactor has been upgraded again to the power level of 2000 kW. During the modification of the reactor, the Center for Research and Development of Nuclear Techniques (CRDNT) was management of the reactor as it faced many problems, either technical or non-technical ones. This caused the upgrading activities to take a long time. At this time, the reactor upgrading has almost finished, and the nuclear commissioning is going on. Several aspects and problems associated with the upgrading process have been reviewed and the results are discussed in the present paper. (author)

  7. Status of the Upgrade of the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M; Bartmann, W; Bartolome, S; Benedetto, E; Bertone, C; Blas, A; Bonnal, P; Borburgh, J; Bozzini, D; Butterworth, A; Carli, C; Carlier, E; Cole, J; Dahlen, P; Delonca, M; Dobers, T; Findlay, A; Froeschl, R; Hansen, J; Hay, D; Jensen, S; Lacroix, J; Le Roux, P; Lopez Hernandez, L; Maglioni, C; Masi, A; Mason, G; Mathot, S; Mikulec, B; Muttoni, Y; Newborough, A; Nisbet, D; Olek, S; Paoluzzi, M; Perillo-Marcone, A; Pittet, S; Puccio, B; Raginel, V; Riffaud, B; Ruehl, I; Sarrió Martínez, A; Tan, J; Todd, B; Venturi, V; Weterings, W

    2013-01-01

    The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H- ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.

  8. Possible neutral beam requirements for TFTR upgrades

    International Nuclear Information System (INIS)

    Prichard, B.A. Jr.; Little, R.; Post, D.E.; Schmidt, J.A.

    1977-01-01

    A discussion is provided of possible neutral beam requirements and constraints for a TFTR upgrade. The time scale is the early 80s and beams of 250 keV D 0 , probably using 65 ampere negative ion sources, existing power supplies and vacuum enclosures would be required

  9. The ALICE TPC Upgrad

    Science.gov (United States)

    Castro, Andrew; Alice-Usa Collaboration; Alice-Tpc Collaboration

    2017-09-01

    The Time Projection Chamber (TPC) currently used for ALICE (A Large Ion Collider Experiment at CERN) is a gaseous tracking detector used to study both proton-proton and heavy-ion collisions at the Large Hadron Collider (LHC) In order to accommodate the higher luminosit collisions planned for the LHC Run-3 starting in 2021, the ALICE-TPC will undergo a major upgrade during the next LHC shut down. The TPC is limited to a read out of 1000 Hz in minimum bias events due to the intrinsic dead time associated with back ion flow in the multi wire proportional chambers (MWPC) in the TPC. The TPC upgrade will handle the increase in event readout to 50 kHz for heavy ion minimum bias triggered events expected with the Run-3 luminosity by switching the MWPCs to a stack of four Gaseous Electron Multiplier (GEM) foils. The GEM layers will combine different hole pitches to reduce the dead time while maintaining the current spatial and energy resolution of the existing TPC. Undertaking the upgrade of the TPC represents a massive endeavor in terms of design, production, construction, quality assurance, and installation, thus the upgrade is coordinated over a number of institutes worldwide. The talk will go over the physics motivation for the upgrade, the ALICE-USA contribution to the construction of Inner Read Out Chambers IROCs, and QA from the first chambers built in the U.S

  10. Concept of Advanced Back-up Control Panel Design of Digital Main Control Room

    International Nuclear Information System (INIS)

    Jiang, Guo Jin; Sun, Yong Bin; Tan, Ke; Zhang, Li Ming; Shi, Ji; Zhang, Xue Gang; Huang, Wei Jun; Mao, Ting; Liu Yanzi

    2011-01-01

    Back-up control panel (BCP) of digital main control room (DMCR) is the backup means for main computerized control means (MCM). This paper focus on technical issues for advanced design of Backup Panel (BCP) for CPR1000 using qualified computer-based video display unit to display plant process indication and alarms. HFE issues also have been considered in the BCP design. Then, mean to fulfill safety target of NPP, best ergonomic effect has been described. At last conclusion on advanced BCP design is provided

  11. Improving the Quality of Backup Process for Publishing Houses and Printing Houses

    Science.gov (United States)

    Proskuriakov, N. E.; Yakovlev, B. S.; Pries, V. V.

    2018-04-01

    The analysis of main types for data threats, used by print media, and their influence on the vitality and security of information is made. The influence of the programs settings for preparing archive files, the types of file managers on the backup process is analysed. We proposed a simple and economical version of the practical implementation of the backup process consisting of 4 components: the command line interpreter, the 7z archiver, the Robocopy utility, and network storage. We recommend that the best option would be to create backup copies, consisting of three local copies of data and two network copies.

  12. Concept of Advanced Back-up Control Panel Design of Digital Main Control Room

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, Guo Jin; Sun, Yong Bin; Tan, Ke; Zhang, Li Ming; Shi, Ji; Zhang, Xue Gang; Huang, Wei Jun; Mao, Ting; Liu Yanzi [China Nuclear Power Engineering Company, Shenzen (China)

    2011-08-15

    Back-up control panel (BCP) of digital main control room (DMCR) is the backup means for main computerized control means (MCM). This paper focus on technical issues for advanced design of Backup Panel (BCP) for CPR1000 using qualified computer-based video display unit to display plant process indication and alarms. HFE issues also have been considered in the BCP design. Then, mean to fulfill safety target of NPP, best ergonomic effect has been described. At last conclusion on advanced BCP design is provided.

  13. Experience from design, prototyping and production of a DC–DC conversion powering scheme for the CMS Phase-1 Pixel Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Feld, Lutz, E-mail: Lutz.Feld@cern.ch; Karpinski, Waclaw; Klein, Katja; Lipinski, Martin; Preuten, Marius; Rauch, Max; Schmitz, Stefan; Wlochal, Michael

    2017-02-11

    The CMS pixel detector will be replaced during the technical stop 2016/2017. To allow the new pixel detector to be powered with the legacy cable plant and power supplies, a novel powering scheme based on DC–DC conversion will be employed. After the successful conclusion of an extensive development and prototyping phase, mass production of 1800 DC–DC converters as well as motherboards and other power PCBs has now been completed. This contribution reviews the lessons learned from the development of the power system for the Phase-1 pixel detector, and summarizes the experience gained from the production phase.

  14. ATLAS Upgrade Programme

    CERN Document Server

    Hillier, S J; The ATLAS collaboration

    2012-01-01

    With the already outstanding LHC luminosity performance, and planned LHC upgrades in the upcoming shutdowns, it is expected that within a short time-scale, the general purpose LHC experiments will have to cope with luminosities beyond their original design. In order to maintain detector performance and sensitivity to expected and new physics processes, ATLAS has defined a continuous upgrade programme which foresees staged enhancements during the next 10 years of operation, and then more widespread changes before the transition to the highest luminosities after 2022. This talk will describe several components of the ATLAS upgrade, focusing in particular on the Inner Detector and Trigger. The Inner Detector faces two challenges in the higher luminosity environment: high particle multiplicities and increased radiation dose. These will be addressed in the short term by a new layer of Pixel detectors, and in the long term by a complete replacement. The Trigger faces an increasingly difficult task of distinguishing...

  15. Upgradation of Apsara reactor

    International Nuclear Information System (INIS)

    Mammen, S.; Mukherjee, P.; Bhatnagar, A.; Sasidharan, K.; Raina, V.K.

    2009-01-01

    Apsara is a 1 MW swimming pool type research reactor using high enriched uranium as fuel with light water as coolant and moderator. The reactor is in operation for more than five decades and has been extensively used for basic research, radioisotope production, neutron radiography, detector testing, shielding experiments etc. In view of its long service period, it is planned to carry out refurbishment of the reactor to extend its useful life. During refurbishment, it is also planned to upgrade the reactor to a 2 MW reactor to improve its utilization and to upgrade the structure, system and components in line with the current safety standards. This paper gives a brief account of the design features and safety aspects of the upgraded Apsara reactor. (author)

  16. Tackling Chinese Upgrading through Experimentalism and Pragmatism

    DEFF Research Database (Denmark)

    Kirkegaard, Julia Kirch

    2017-01-01

    This paper examines the development of China’s wind turbine industry, shedding light on the Chinese mode of disruptive industrial upgrading through policy pragmatism and fragmented, experimental governance. Based on a historical analysis of China’s wind turbine industry, the paper highlights three...... distinct phases, which are all marked by their own inbuilt and potentially self-disruptive impasses and associated crises. In turn, these impasses have forced the Chinese government into radical and flexible interventions, which have spurred on Chinese companies to creatively find new ways to develop...... and upgrade. The paper illustrates the transformation of Sino–foreign relations by China’s non-linear upgrading approach, particularly during the Chinese wind power industry’s quality crisis, and its development model. It also discusses the implications this examination of China’s approach has...

  17. The UKIRT Upgrades Programme

    Science.gov (United States)

    Adamson, Andy; Davies, John; Robson, Ian

    Tim Hawarden presented this paper to the 30th anniversary workshop, just a month before his untimely death. The editors have done their best to convert his talk into this paper, and gratefully acknowledge the assistance of Nick Rees (a member of the Upgrades team, now at Diamond Light Source). Tim's discussion concerned the UKIRT Upgrades Project, which ran through the 1990s and transformed the telescope and made it truly competitive on the world stage for operation into the twenty-first century. The reference list at the end of the paper is comprehensive; some of these are referred to in the paper itself and some are included for completeness only.

  18. AGS intensity upgrades

    International Nuclear Information System (INIS)

    Roser, T.

    1995-01-01

    After the successful completion of the AGS Booster and several upgrades of the AGS, a new intensity record of 6.3 x 10 13 protons per pulse accelerated to 24 GeV was achieved. The high intensity slow-extracted beam program at the AGS typically serves about five production targets and about eight experiments including three rare Kaon decay experiments. Further intensity upgrades are being discussed that could increase the average delivered beam intensity by up to a factor of four

  19. OMEGA upgrade staging options

    International Nuclear Information System (INIS)

    Kelly, J.H.; Shoup, M.J.; Smith, D.L.

    1989-01-01

    The authors discuss how they are designing an upgrade to its 24-beam OMEGA laser system, OMEGA is a frequency tripled, all-rod system capable of producing 2 kJ at 0.8 ns on target. Important direct-drive-target-ignition physics could be investigated with an upgraded system capable of producing a shaped pulse consisting of a long (5ns) low-intensity, foot, smoothly transitioning into a short (0.5 ns), intense, compression pulse. The total pulse energy is 30 kJ, which, from target-irradiation uniformity considerations, must be distributed over 60 beams

  20. J-PARC accelerator and neutrino beamline upgrade programme

    Science.gov (United States)

    Friend, M.

    2017-09-01

    The 30 GeV proton beam from the J-PARC Main Ring (MR) accelerator is used to produce a world-class conventional neutrino beam - the neutrino source for the J-PARC long-baseline neutrino programme, including the current T2K experiment and proposed future experiments. Planned upgrades to increase the beam power of the MR from the current ˜400 kW to the design power of 750 kW and beyond, to 1.3+ MW, are underway. These include hardware modifications, such as upgrades of the MR magnet power supplies, RF systems, and feedback systems, as well as a change of the MR beam betatron tune point. Upgrades to the neutrino beamline, such as to the proton beam monitoring, horns, and radioactive material handling, will also be required to accommodate the increased proton beam power. An overview of planned J-PARC MR and neutrino facility upgrades is given.

  1. Climate balance of biogas upgrading systems

    International Nuclear Information System (INIS)

    Pertl, A.; Mostbauer, P.; Obersteiner, G.

    2010-01-01

    One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO 2 .

  2. VISIR upgrade overview and status

    Science.gov (United States)

    Kerber, Florian; Käufl, Hans Ulrich; Baksai, Pedro; Dobrzycka, Danuta; Finger, Gert; Ives, Derek; Jakob, Gerd; Lagadec, Eric; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Moerchen, Margaret; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Siebenmorgen, Ralf; Silber, Armin; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Venema, Lars; Weilenmann, Ueli; Yegorova, Irina

    2012-09-01

    We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As Aquarius detector array (Raytheon) which has demonstrated very good performance (sensitivity, stability) in the laboratory IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a userdefined constraint on water vapour. Improved pipelines based on the ESO Reflex concept will provide better support to astronomers. The upgraded VISIR will be a powerful instrument providing background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes. The intervention on VISIR and installation of hardware has been completed in July and commissioning will take place during July and August. VISIR is scheduled to be available to the users starting Oct 2012.

  3. Upgrade of the CMS hardron calorimeter for an upgraded LHC

    OpenAIRE

    Anderson, Jake

    2012-01-01

    The CMS barrel and endcap hadron calorimeters (Hcal) upgrading the current photo-sensors are hybrid photodiodes (HPDs) to meet the demands of the upgraded luminosity of the LHC. A key aspect of the Hcal upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at L1 trigger. The increased segmentation can be achieved by replacing the HPD's with multi-pixel Geiger-mode avalanche photodiodes. The upgraded electron...

  4. Solar dryer with thermal storage and biomass-backup heater

    Energy Technology Data Exchange (ETDEWEB)

    Madhlopa, A. [Department of Physics and Biochemical Sciences, Malawi Polytechnic, P/Bag 303, Blantyre 3 (Malawi); Ngwalo, G. [Department of Mechanical Engineering, Malawi Polytechnic, P/Bag 303, Blantyre 3 (Malawi)

    2007-04-15

    An indirect type natural convection solar dryer with integrated collector-storage solar and biomass-backup heaters has been designed, constructed and evaluated. The major components of the dryer are biomass burner (with a rectangular duct and flue gas chimney), collector-storage thermal mass and drying chamber (with a conventional solar chimney). The thermal mass was placed in the top part of the biomass burner enclosure. The dryer was fabricated using simple materials, tools and skills, and it was tested in three modes of operation (solar, biomass and solar-biomass) by drying twelve batches of fresh pineapple (Ananas comosus), with each batch weighing about 20 kg. Meteorological conditions were monitored during the dehydration process. Moisture and vitamin C contents were determined in both fresh and dried samples. Results show that the thermal mass was capable of storing part of the absorbed solar energy and heat from the burner. It was possible to dry a batch of pineapples using solar energy only on clear days. Drying proceeded successfully even under unfavorable weather conditions in the solar-biomass mode of operation. In this operational mode, the dryer reduced the moisture content of pineapple slices from about 669 to 11% (db) and yielded a nutritious dried product. The average values of the final-day moisture-pickup efficiency were 15%, 11% and 13% in the solar, biomass and solar-biomass modes of operation respectively. It appears that the solar dryer is suitable for preservation of pineapples and other fresh foods. Further improvements to the system design are suggested. (author)

  5. A right hemisphere safety backup at work: hypotheses for deep hypnosis, post-traumatic stress disorder, and dissociation identity disorder.

    Science.gov (United States)

    Burnand, Gordon

    2013-09-01

    Problem theory points to an a priori relation between six key problems of living, to which people have adapted through evolution. Children are guided through the problems one by one, learning to switch between them automatically and unawares. The first problem of raising hope of certainty (about the environment), is dealt with in the right hemisphere (RH). The second of raising hope of freedom (or power to control), is dealt with in the left hemisphere (LH). Here adventurousness and ignoring the goodness of outcomes potentially create recklessness. When uncertainty rises the RH activates a backup with an override that substitutes immobility, takes over sensory inputs, but allows obedience to parental commands, and a cut-out that stops new work on the freedom problem. Support for the use of the backup by infants is found in the immobility that precedes the crying in strange conditions, and in childhood EEGs. The hypothesis that the backup is active in deep hypnosis imposes accord on findings that appear contradictory. For example it accounts for why observations during deep hypnosis emphasize the activity of the RH, but observations of responsive people not under hypnosis emphasize the activity of the LH. The hypothesis that the backup is active in post-traumatic stress disorder (PTSD) is supported by (a) fMRI observations that could reflect the cut-out, in that part of the precuneus has low metabolism, (b) the recall of motionlessness at the time of the trauma, (c) an argument that playing dead as a defence against predators is illogical, (d) the ease of hypnosis. With dissociative identity disorder (DID), the theory is consistent with up to six alters that have executive control and one trauma identity state where childhood traumas are re-experienced. Support for the cut-out affecting the trauma identity state comes from suppression of part of the precuneus and other parts of the parietal lobe when the trauma identity state is salient and a general script about a

  6. Feasibility study of the university of Utah TRIGA reactor power upgrade - Part I: Neutronics-based study in respect to control rod system requirements and design

    Directory of Open Access Journals (Sweden)

    Ćutić Avdo

    2013-01-01

    Full Text Available We present a summary of extensive studies in determining the highest achievable power level of the current University of Utah TRIGA core configuration in respect to control rod requirements. Although the currently licensed University of Utah TRIGA power of 100 kW provides an excellent setting for a wide range of experiments, we investigate the possibility of increasing the power with the existing fuel elements and core structure. Thus, we have developed numerical models in combination with experimental procedures so as to assess the potential maximum University of Utah TRIGA power with the currently available control rod system and have created feasibility studies for assessing new core configurations that could provide higher core power levels. For the maximum determined power of a new University of Utah TRIGA core arrangement, a new control rod system was proposed.

  7. Mechanization of and experience with a triplex fly-by-wire backup control system

    Science.gov (United States)

    Lock, W. P.; Petersen, W. R.; Whitman, G. B.

    1976-01-01

    A redundant three axis analog control system was designed and developed to back up a digital fly by wire control system for an F-8C airplane. The mechanization and operational experience with the backup control system, the problems involved in synchronizing it with the primary system, and the reliability of the system are discussed. The backup control system was dissimilar to the primary system, and it provided satisfactory handling through the flight envelope evaluated. Limited flight tests of a variety of control tasks showed that control was also satisfactory when the backup control system was controlled by a minimum displacement (force) side stick. The operational reliability of the F-8 digital fly by wire control system was satisfactory, with no unintentional downmodes to the backup control system in flight. The ground and flight reliability of the system's components is discussed.

  8. Keeping the LHC in power

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    The critical safety equipment around the LHC, including the machine protection systems, is connected to Uninterruptible Power Supplies (UPS).  In case of mains failure, the UPS systems continue to power, for a limited time, these critical systems and ensure a safe shutdown of the accelerator. This week, work began to upgrade and replace over 100 UPS systems in the LHC.   The new UPS installations. For the LHC, even a perturbation on the mains is more than just an inconvenience: it often results in beam dumps and, in some cases, requires an energy extraction from superconducting circuits. When this occurs, machine protection systems, and in particular the Quench Protection System, must remain active to correctly carry out the shutdown procedure. With the UPS systems, 10 minutes of crucial power can be provided to the protection systems during this critical phase. There are currently two UPS systems in place in each one of the 32 LHC UPS zones. Originally one was used as a backup if ...

  9. OMEGA Upgrade preliminary design

    International Nuclear Information System (INIS)

    Craxton, R.S.

    1989-10-01

    The OMEGA laser system at the Laboratory for Laser Energetics of the University of Rochester is the only major facility in the United States capable of conducting fully diagnosed, direct-drive, spherical implosion experiments. As such, it serves as the national Laser Users Facility, benefiting scientists throughout the country. The University's participation in the National Inertial Confinement Fusion (ICF) program underwent review by a group of experts under the auspices of the National Academy of Sciences (the Happer Committee) in 1985. The Happer Committee recommended that the OMEGA laser be upgraded in energy to 30 kJ. To this end, Congress appropriated $4,000,000 for the preliminary design of the OMEGA Upgrade, spread across FY88 and FY89. This document describes the preliminary design of the OMEGA Upgrade. The proposed enhancements to the existing OMEGA facility will result in a 30-kHJ, 351-nm, 60-beam direct-drive system, with a versatile pulse-shaping facility and a 1%--2% uniformity of target drive. The Upgrade will allow scientists to explore the ignition-scaling regime, and to study target behavior that is hydrodynamically equivalent to that of targets appropriate for a laboratory microfusion facility (LMF). In addition, it will be possible to perform critical interaction experiments with large-scale-length uniformly irradiated plasmas

  10. Treat upgrade fuel fabrication

    International Nuclear Information System (INIS)

    Davidson, K.V.; Schell, D.H.

    1979-01-01

    An extrusion and thermal treatment process was developed to produce graphite fuel rods containing a dispersion of enriched UO 2 . These rods will be used in an upgraded version of the Transient Reactor Test Facility (TREAT). The improved fuel provides a higher graphite matrix density, better fuel dispersion and higher thermal capabilities than the existing fuel

  11. ATLAS Pixel Detector Upgrade

    CERN Document Server

    Flick, T; The ATLAS collaboration

    2009-01-01

    The first upgrade for higher luminosity at LHC for the ATLAS pixel detector is the insertion of a forth layer, the IBL. The talk gives an overview about what the IBL is and how it will be set up, as well as to give a status of the research and develoment work.

  12. Upgrading Undergraduate Biology Education

    Science.gov (United States)

    Musante, Susan

    2011-01-01

    On many campuses throughout the country, undergraduate biology education is in serious need of an upgrade. During the past few decades, the body of biological knowledge has grown exponentially, and as a research endeavor, the practice of biology has evolved. Education research has also made great strides, revealing many new insights into how…

  13. Upgrade of telephone exchange

    CERN Multimedia

    2006-01-01

    As part of the upgrade of telephone services, work will be carried out on the CERN switching centre between Monday 23 October 8.00 p.m. and Tuesday 24 October 2.00 a.m. Telephone services may be disrupted and possibly even interrupted during this operation. We apologise in advance for any inconvenience this may cause. CERN TELECOM Service

  14. Heavy water upgrader of 'Fugen'

    International Nuclear Information System (INIS)

    Matsushita, Tadashi; Sasaki, Shigeo

    1980-01-01

    The nuclear power station of the advanced thermal prototype reactor ''Fugen'' has continued the smooth operation since it started the fullscale operation in March, 1979. Fugen is the first heavy water-moderated, boiling light water-cooled reactor in Japan, and its outstanding feature is the use of heavy water as the moderator. The quantity of heavy water retained in Fugen is about 140 m 3 , and the concentration is 99.8 wt.%. This heavy water had been made is USA, and was imported from F.R. of Germany where it had been used. Heavy water is an internationally regulated material, and it is very expensive and hard to purchase. Therefore in order to prevent the deterioration of heavy water and to avoid its loss as far as possible, the management of the quantity and the control of the water quality have been carried out carefully and strictly. The generation of deteriorated heavy water occurs from the exchange of ion exchange resin for poison removal and purification. The heavy water upgrader reconcentrates the deteriorated heavy water of high concentration and returns to the heavy water system, and it was installed for the purpose of reducing the purchase of supplementary heavy water. The outline of the heavy water upgrader, its construction, the performance test and the operation are described. (Kako, I.)

  15. Optimized Heat Pipe Backup Cooling System Tested with a Stirling Convertor

    Science.gov (United States)

    Schwendeman, Carl L.; Tarau, Calin; Schifer, Nicholas A.; Anderson, William G.; Garner, Scott

    2016-01-01

    In a Stirling Radioisotope Power System (RPS), heat must be continuously removed from the General Purpose Heat Source (GPHS) modules to maintain the modules and surrounding insulation at acceptable temperatures. The Stirling convertor normally provides this cooling. If the Stirling convertor stops in the current system, the insulation is designed to spoil, preventing damage to the GPHS at the cost of an early termination of the mission. An alkali-metal variable conductance heat pipe (VCHP) can be used to passively allow multiple stops and restarts of the Stirling convertor by bypassing the heat during stops. In a previous NASA Small Business Innovation Research (SBIR) Program, Advanced Cooling Technologies, Inc. (ACT) developed a series of sodium VCHPs as backup cooling systems for the Stirling RPS. In 2012, one of these VCHPs was successfully tested at NASA Glenn Research Center with a Stirling convertor as an Advanced Stirling Radioisotope Generator (ASRG) backup cooling system. The prototype; however, was not optimized and did not reflect the final heat rejection path. ACT through further funding has developed a semioptimized prototype with the finalized heat path for testing at Glenn with a Stirling convertor. The semioptimized system features a two-phase radiator and is significantly smaller and lighter than the prior prototype to reflect a higher level of flight readiness. The VCHP is designed to activate and remove heat from the GPHS during stoppage with a small temperature increase from the nominal vapor temperature. This small temperature increase from nominal is low enough to avoid risking standard ASRG operation and spoiling of the multilayer insulation (MLI). The VCHP passively allows the Stirling convertor to be turned off multiple times during a mission with potentially unlimited off durations. Having the ability to turn the Stirling off allows for the Stirling to be reset and reduces vibrations on the platform during sensitive measurements or

  16. Independent Orbiter Assessment (IOA): Assessment of the backup flight system FMEA/CIL

    Science.gov (United States)

    Prust, E. E.; Ewell, J. J., Jr.; Hinsdale, L. W.

    1988-01-01

    The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA effort first completed an analysis of the Backup Flight System (BFS) hardware, generating draft failure modes and Potential Critical Items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. The IOA results were then compared to the proposed NASA Post 51-L FMEA/CIL baseline. A resolution of each discrepancy from the comparison is provided through additional analysis as required. This report documents the results of that comparison for the Orbiter BFS hardware. The IOA product for the BFS analysis consisted of 29 failure mode worksheets that resulted in 21 Potential Critical Items (PCI) being identified. This product was originally compared with the proposed NASA BFS baseline and subsequently compared with the applicable Data Processing System (DPS), Electrical Power Distribution and Control (EPD and C), and Displays and Controls NASA CIL items. The comparisons determined if there were any results which had been found by the IOA but were not in the NASA baseline. The original assessment determined there were numerous failure modes and potential critical items in the IOA analysis that were not contained in the NASA BFS baseline. Conversely, the NASA baseline contained three FMEAs (IMU, ADTA, and Air Data Probe) for CIL items that were not identified in the IOA product.

  17. SRS control system upgrade requirements

    International Nuclear Information System (INIS)

    Hill, L.F.

    1998-01-01

    This document defines requirements for an upgrade of the Sodium Removal System (SRS) control system. The upgrade is being performed to solve a number of maintainability and operability issues. The upgraded system will provide the same functions, controls and interlocks as the present system, and in addition provide enhanced functionality in areas discussed in this document

  18. Performing instrumentation and controls upgrades

    International Nuclear Information System (INIS)

    Kessler, F. M.; Connell, T. J.; Ryan, M. P.

    1992-01-01

    I and C upgrades are comprised of a varying range of content, complexity, expansiveness, and criticality. There are common threads in all upgrades which can be simplified by the development of a long term I and C upgrade plan. The development of a such a plan can establish effective ground rules for upgrades, large and small. It can be the basis from which to begin an upgrade evaluation and the standard which is used to compare the degree of compliance of any upgrade regarding the plan or to define the differences from the plan and an individual upgrade. Primary motivation for I and C upgrades are obsolescence and unavailability of spare parts. Numerous other areas of consideration are also involved in an upgrade. Today's technology results in most upgrades largely or totally utilizing digital equipment. The use of digital equipment is fairly new in many I and C applications and requires an elaborate evaluation from functional, qualification, operational, and licensing perspectives as well as others. A well defined upgrade plan developed as a basis for I and C upgrades is a significant start to ensuring an effective upgrade process. Properly developed and implemented, the plan will support I and C upgrade efforts to ensure that the intricacies associated with such tasks eliminate the existing problems which require the upgrade to be performed. The upgrade plan also results in ensuring the maximum benefit from all perspectives of the plant enhancements being carried out and considered for future implementation. Instrumentation and controls aging and replacement are issues of growing importance due to the potential for significant impact on plant operation and efficiency. Obsolescence and unavailability of spare parts are major drivers towards evaluating the cost benefits of upgrading current equipment. In addition to these two primary factors, the advantages of utilizing digital equipment have also become of prime importance when evaluating instrumentation and

  19. ATR Technical Specification Upgrade Program

    International Nuclear Information System (INIS)

    McCracken, R.T.; Durney, J.L.; Freund, G.A.

    1990-01-01

    The Advanced Test Reactor (ATR) is a 250 MW, uranium-aluminum fueled test reactor which began full power operation in 1969. The initial operation was controlled by an Operating Limits document based on the original Safety Analysis Report. Additional safety bases were later developed to support Technical Specifications which were approved and implemented in 1977. The Technical Specifications which were initially developed with content and format specified in ANSI/ANS--15.1, ''The Development of Technical Specifications for Research Reactors.'' The safety basis documentation and the Technical Specifications have been updated as required to maintain them current with the ATR facility configuration. All revisions have been made with a content, format and style consistent with the original. A major, two-phase program to upgrade the content, format and style is in progress. This paper describes the first phase of this program

  20. Some retrofit considerations for revitalizing and upgrading the Oji-River coal-fired thermal power station for service in 21st century Nigeria

    Energy Technology Data Exchange (ETDEWEB)

    Oguejofor, G.C. [Nnamdi Azikiwe University, Awka (Nigeria). Faculty of Engineering & Technology, Dept. of Chemical Engineering

    2003-02-01

    The aim of this article is to show that in the context of sustainable development, coal and its downstream power generation industry could complement petroleum and hydroelectric industries in the national power generation scheme. The continued utilization of coal in power generation schemes in the world as well as environmental pollution caused by other fossil fuels were examined. These were presented as justifications for the proposed reintegration of coal as a complement to hydropower and oil/gas sources of electric energy in Nigeria. The scheme of power generation in the Oji-River thermal station was reviewed to enhance the appreciation of the retrofit models to be presented for the revitalization of the plant. Subsequently, two sustainable development retrofit models were considered for the revitalization of the Oji-River thermal power station and enhanced industrial civilization of the Oji neighbourhood. To ensure self-sufficiency, the paper shows how the two retrofit models depend on abundant locally available resources, namely, coal, limestone, water and air.

  1. CMS pixel upgrade project

    CERN Document Server

    Kaestli, Hans-Christian

    2010-01-01

    The LHC machine at CERN finished its first year of pp collisions at a center of mass energy of 7~TeV. While the commissioning to exploit its full potential is still ongoing, there are plans to upgrade its components to reach instantaneous luminosities beyond the initial design value after 2016. A corresponding upgrade of the innermost part of the CMS detector, the pixel detector, is needed. A full replacement of the pixel detector is planned in 2016. It will not only address limitations of the present system at higher data rates, but will aggressively lower the amount of material inside the fiducial tracking volume which will lead to better tracking and b-tagging performance. This article gives an overview of the project and illuminates the motivations and expected improvements in the detector performance.

  2. CMS pixel upgrade project

    CERN Document Server

    INSPIRE-00575876

    2011-01-01

    The LHC machine at CERN finished its first year of pp collisions at a center of mass energy of 7 TeV. While the commissioning to exploit its full potential is still ongoing, there are plans to upgrade its components to reach instantaneous luminosities beyond the initial design value after 2016. A corresponding upgrade of the innermost part of the CMS detector, the pixel detector, is needed. A full replacement of the pixel detector is planned in 2016. It will not only address limitations of the present system at higher data rates, but will aggressively lower the amount of material inside the fiducial tracking volume which will lead to better tracking and b-tagging performance. This article gives an overview of the project and illuminates the motivations and expected improvements in the detector performance.

  3. Performance of the first ASDEX Upgrade neutral beam injector

    International Nuclear Information System (INIS)

    Staebler, A.; Vollmer, O.; Feist, J.H.; Speth, E.; Heinemann, B.; Melkus, W.; Obermayer, S.; Riedl, R.; Schaerich, W.; Wittenbecher, K.

    1995-01-01

    Plasmas of the ASDEX Upgrade tokamak have been heated with H 0 beams of up to 7 MW and D 0 beams of up to 10 MW. Beam modulation allows to inject at any power level between zero and full power. Measurements characterizing the NBI system performance, the power accountability, and the operational experience obtained so far are discussed. (orig.)

  4. Design works organization during the IandC system upgrading on an operating VVER power plant from the general designer's standpoint

    International Nuclear Information System (INIS)

    Krepel, V.

    1997-01-01

    Two replacements of nuclear power plant instrumentation and control systems have already been implemented according to the project design of Energoprojekt: at the Mochovce WWER-440 and the Temelin WWER-1000 plants. In the present contribution the design problems encountered during the replacement are described, the causes of the problems are discussed, and a policy of organizing project design work for an instrumentation and control system replacement at an operating WWER power plant is established such as would avoid these problems. (A.K.)

  5. The CDF upgrade

    International Nuclear Information System (INIS)

    Newman-Holmes, C.

    1995-01-01

    The Collider Detector at Fermilab (CDF) has been used to study proton-antiproton collisions at the Fermilab Tevatron since 1985. Over the years, the detector has evolved steadily to increase its physics capability and to keep pace with improvements to the Tevatron. Fermilab is currently building a new Main Injector accelerator which will lead to even larger luminosity values. This paper describes upgrades to CDF that will allow one to exploit the higher luminosity of the Main Injector

  6. LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hennessy, Karol

    2017-02-11

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1}. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have 55×55 μm{sup 2} pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The foil will be manufactured through milling and possibly thinned further by chemical etching. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates. The current status of the VELO upgrade is described and latest results from operation of irradiated sensor assemblies are presented.

  7. The LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Dosil Suárez, Álvaro, E-mail: alvaro.dosil@usc.es

    2016-07-11

    The upgrade of the LHCb experiment, planned for 2019, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm. The upgraded detector will run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1} and probe physics beyond the Standard Model in the heavy flavour sector with unprecedented precision. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The detector comprises silicon pixel sensors with 55×55 μm{sup 2} pitch, read out by the VeloPix ASIC, based on the TimePix/MediPix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The detector halves are retracted when the beams are injected and closed at stable beams, positioning the first sensitive pixel at 5.1 mm from the beams. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates.

  8. The D0 upgrade

    International Nuclear Information System (INIS)

    Tuts, P.M.

    1992-10-01

    The original D0 detector was proposed in 1983, with a focus on high P T physics using precision measurements of e's, μ's, jets, and missing E T . This detector, as of the summer of 1992, has started data taking at the Fermilab Collider. However, by 1995/6 the luminosity will reach 10 31 cm -2 sec -1 , and the minimum bunch spacing will drop to 396ns from the present 3.5μs (by the Main Injector era, luminosities will approach 10 32 cm -2 sec -1 and minimum bunch spacings may reach 132ns). These changes in the accelerator conditions force us to upgrade or replace a number of detector subsystems in order to meet these new demands. In addition, the upgrade offers us the opportunity to expand the physics horizons to include not only the all important high P T physics menu, but also the low P T physics that has become increasingly important. In this paper we describe the D0 detector upgrade

  9. ATLAS Upgrade Plans

    CERN Document Server

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000/fb by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new...

  10. The LHCb VELO upgrade

    International Nuclear Information System (INIS)

    Rodríguez Pérez, Pablo

    2013-01-01

    LHCb is a forward spectrometer experiment dedicated to the study of new physics in the decays of beauty and charm hadrons produced in proton collisions at the Large Hadron Collider (LHC) at CERN. The VErtex LOcator (VELO) is the microstrip silicon detector surrounding the interaction point, providing tracking and vertexing measurements. The upgrade of the LHCb experiment, planned for 2018, will increase the luminosity up to 2×10 33 cm −2 s −1 and will perform the readout as a trigger-less system with an event rate of 40 MHz. Extremely non-uniform radiation doses will reach up to 5×10 15 1 MeV n eq /cm 2 in the innermost regions of the VELO sensors, and the output data bandwidth will be increased by a factor of 40. An upgraded detector is under development based in a pixel sensor of the Timepix/Medipix family, with 55×55μm 2 pixels. In addition a microstrip solution with finer pitch, higher granularity and thinner than the current detector is being developed in parallel. The current status of the VELO upgrade program will be described together with recent testbeam results

  11. The LHCb VELO Upgrade

    CERN Document Server

    de Capua, Stefano

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-3, will transform the experiment to a triggerless system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm, enabling the detector to run at luminosities of 2×1033 cm−2 s −1 . The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current strip detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will allow for fast pattern recognition and track reconstruction in the software trigger. The silicon pixel sensors have 55×55 µm2 pitch, and are read out by the VeloPix ASIC. The VeloPix builds on the currently available Timepix3, modified to deliver a radiation hard design capable of an order of magnitude increase in output rate. The hottest regions will have pixel hit rates of 900 Mhits/s, yielding a total data rate more than 3 Tbit/s for the upgraded VELO...

  12. LHCb VELO Upgrade

    CERN Document Server

    Hennessy, Karol

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of $2\\times10^{33} \\mathrm{cm}^{-2}\\mathrm{s}^{-1}$. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have $55\\times55 \\mu m^{2}$ pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separate...

  13. Recent ECRH results in ASDEX upgrade

    International Nuclear Information System (INIS)

    Leuterer, F.; Dux, R.; Gantenbein, G.

    2003-01-01

    This paper provides an overview on recent experimental results obtained in ASDEX Upgrade using electron cyclotron heating and current drive. The following topics are covered: determination of the power deposition profile, modulated power deposition, studies of the electron heat transport via power balance and heat wave analysis and a comparison with turbulent transport theory, generation of an internal transport barrier for the electron heat flux, impact of electron cyclotron resonance heating (ECRH) on particle and impurity transport, and studies related to neoclassical tearing modes and to sawteeth. (author)

  14. Empirical Analysis of High Efficient Remote Cloud Data Center Backup Using HBase and Cassandra

    Directory of Open Access Journals (Sweden)

    Bao Rong Chang

    2015-01-01

    Full Text Available HBase, a master-slave framework, and Cassandra, a peer-to-peer (P2P framework, are the two most commonly used large-scale distributed NoSQL databases, especially applicable to the cloud computing with high flexibility and scalability and the ease of big data processing. Regarding storage structure, different structure adopts distinct backup strategy to reduce the risks of data loss. This paper aims to realize high efficient remote cloud data center backup using HBase and Cassandra, and in order to verify the high efficiency backup they have applied Thrift Java for cloud data center to take a stress test by performing strictly data read/write and remote database backup in the large amounts of data. Finally, in terms of the effectiveness-cost evaluation to assess the remote datacenter backup, a cost-performance ratio has been evaluated for several benchmark databases and the proposed ones. As a result, the proposed HBase approach outperforms the other databases.

  15. Premature failure analysis of forged cold back-up roll in a continuous tandem mill

    International Nuclear Information System (INIS)

    Rad, Hamid Reza Bakhsheshi; Monshi, Ahmad; Idris, Mohd Hasbullah; Kadir, Mohammed Rafiq Abdul; Jafari, Hassan

    2011-01-01

    Highlights: → Metal wrapping and strip welding in work/back-up rolls contact zone caused spalling. → MnS inclusion and pore initiated crack which propagated in milling led to spalling. → Retained austenite conversion to α'-martensite accelerated spalling failure. → Needle shaped carbide (Fe,Mo,Cr) 7 C 3 , may cause poor service life of back-up roll. -- Abstract: In this paper, premature failure of a forged back-up roll from a continuous tandem mill was investigated. Microstructural evolutions of the spalled specimen and surface of the roll were characterized by optical microscopy, X-ray diffraction, scanning electron microscopy and ferritscopy, while hardness value of the specimen was measured by Vickers hardness testing. The results revealed that the presence of pore and MnS inclusion with spherical and oval morphologies were the main contributing factors responsible for the poor life of the back-up roll. In addition, metal pick up and subsequently strip welding on the surface of the work roll were found as the major causes of failure in work roll which led to spalling occurrence in the back-up roll. Furthermore, relatively high percentage of retained austenite, say 9%, in outer surface of the back-up roll contributed spalling due to conversion of this meta-stable phase to martensite and creation of volume expansion on the outer surface through work hardening during mill campaign.

  16. Kongiganak Wind Turbine Replacement and System Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Boonstra, Patrick [Intelligent Energy Systems, Anchorage, AK (United States)

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  17. CORRECTION SYSTEMS UPGRADE FOR THE SNS RING

    International Nuclear Information System (INIS)

    PAPAPHILIPPOU, Y.; GARDNER, C.J.; LEE, Y.Y.; WEI, J.

    2001-01-01

    In view of the changes in the design of the SNS ring from the original FODO lattice [l] to the 220m hybrid lattice [2] and finally 1.3GeV compatible 248m ring [3], complementary studies have been undertaken, in order to upgrade its correction packages. We review the evolution of the correction systems and present the accelerator physics studies for the adopted schemes and powering plan

  18. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Lingemann, Joschka; Sakulin, Hannes; Jeitler, Manfred; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run 2 of the Large Hadron Collider pose new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run 1, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new microTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (GMT) which combines information from the muon trigger sub-systems and assigns the isolation variable. The upgraded GMT will be implemented using a Master Processor 7 card, built by Imperial College, that features a large Xilinx Virtex 7 FPGA. Up to 72 optical links at...

  19. Equipment and performance upgrade of compact nuclear simulator

    International Nuclear Information System (INIS)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators

  20. Equipment and performance upgrade of compact nuclear simulator

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Chang; Kwon, Kee Choon; Cha, Hyung Ho; Park, Won Man; Song, Soon Ja; Seh, Kyung Won; Joo, Young Chang

    1998-12-01

    In this project, the techniques to upgrade obsolescent nuclear power plant simulation were developed: the simulation code operated in Macro-VAX II has been transplanted to the HP workstation: commercial equipment PLC was adopted for the interface system: the protection logic was developed in the prototype level: and the display system was strengthened. These techniques can be directly used to upgrade other obsolescent simulators.

  1. Upgrading of TREAT experimental capabilities

    International Nuclear Information System (INIS)

    Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

    1982-01-01

    The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system

  2. Introduction of a backup system for data and servers of main IT infrastructure services

    International Nuclear Information System (INIS)

    Hirayama, Takashi; Kannari, Masaaki

    2013-06-01

    The optimization of the JAEA network system has been promoted in accordance with the optimization plan which has the fundamental principles of ensuring its dependability, information security and usability. In respect to ensuring the dependability, we addressed to a) the reduction of both trouble probability and recovery time, and b) an execution of the business continuity plan in time of large-scale earthquake. For the latter, we installed an e-mail backup server and an alternate connection to the internet in Kansai Photon Science Institute (Kizu-area) based on lesson learned from the experience of the Great East Japan Earthquake on March 11, 2011. In addition, we introduced a backup system for data and servers of other main IT infrastructure services. This report documents the configuration and operation of the backup system. (author)

  3. Research and implementation of PC data synchronous backup based on cloud computing

    Directory of Open Access Journals (Sweden)

    WU Yu

    2013-08-01

    Full Text Available In order to better ensure data security,data integrity,and facilitate remote management,this paper has designed and implemented a system model for PC data synchronous backup from the view of the local database and personal data. It focuses on the data backup and uses SQL Azure( a cloud database management system and Visual Studio( a development platform tool . Also the system is released and deployed on the Windows Azure Platform with a unique web portal. Experimental tests show that compared to other data backup methods in non-cloud environment,the system has certain advantages and research value on mobility,interoperability and data management.

  4. Influence of unbalance levels on nonlinear dynamics of a rotor-backup rolling bearing system

    DEFF Research Database (Denmark)

    Fonseca, Cesar A.; Santos, Ilmar; Weber, Hans I.

    2017-01-01

    of nonlinear dynamics applied to the practical use. The theoretical and numerical analyses are shown through orbit plots, phase plans, Poincaré maps, force response in time and double sided spectrum. The latter is important to characterize the condition at different levels of unbalance between forward......Rotor drops in magnetic bearing and unbalance in rotors have been objective of study for many years. The combination of these two well-known phenomena led to an interesting chaotic response, when the rotor touches the inner race of the back-up bearing. The present work explores the nonlinear rotor...... backup bearing dynamics both theoretically and experimentally using a fully instrumented test rig, where the position of shaft, its angular velocity and the contact forces between the shaft and the backup bearing are sampled at 25 kHz. The test rig is built by a removable passive magnetic bearing, which...

  5. The Bevalac Upgrade Project

    International Nuclear Information System (INIS)

    Alonso, J.R.; Dwinell, R.D.; Feinberg, B.

    1987-03-01

    This paper describes a proposed upgrade of the Bevalac accelerator complex in which the present Bevatron is replaced with a modern, strong-focusing 17 T-m synchrotron. This new ring is designed to accelerate all ions throughout the periodic table with intensities 100 to 1000 times higher than the present Bevatron. It will also provide a substantially improved beam spill structure and will reduce operating costs. A fast extraction capability can be used to inject a future heavy ion storage ring. Pulse-to-pulse switching of energy and ion species is an important goal. The existing injectors, shielding, experimental facilities and utilities of the present Bevalac will remain substantially intact

  6. Upgrade Software and Computing

    CERN Document Server

    The LHCb Collaboration, CERN

    2018-01-01

    This document reports the Research and Development activities that are carried out in the software and computing domains in view of the upgrade of the LHCb experiment. The implementation of a full software trigger implies major changes in the core software framework, in the event data model, and in the reconstruction algorithms. The increase of the data volumes for both real and simulated datasets requires a corresponding scaling of the distributed computing infrastructure. An implementation plan in both domains is presented, together with a risk assessment analysis.

  7. Upgrading Enterprise Search

    Energy Technology Data Exchange (ETDEWEB)

    McDunn, R

    2005-04-28

    This presentation will describe the process we went through this past year to upgrade our enterprise search tool from a very old version of Inktomi to the latest version of Verity Ultraseek. We started with requirements gathering and then compared requirements against several available products to determine which product to choose. After purchasing the product, we worked through several defined phases of implementation and customization, with initial rollout late January 2004. Finally, we will show you where we are today and describe future search plans.

  8. Upgrade, rebuild or replace?

    International Nuclear Information System (INIS)

    Forbes, C.A.

    1990-01-01

    Ageing reactor simulators present some tough decisions for utility managers. Although most utilities have chosen the cheaper, upgrading solution as the best compromise between costs and outage length, some US utilities have found that for them, replacement represents the best option. Simulators may be less than ten years old, but they have limited instructor systems, older low fidelity models that cannot reproduce important training scenarios, and out of date, difficult to maintain computers that do not permit much expansion of the models anyway. Perhaps worse than this is the possibility that the simulator may no longer be a faithful reproduction of the referenced plant, or have poor (or non-existent) documentation. (author)

  9. Upgrading and modernization of the high flux reactor Petten

    International Nuclear Information System (INIS)

    Ahlf, J.

    1992-01-01

    The High Flux Reactor (HFR) at Petten, The Netherlands, owned by the European Communities and operated by the Netherlands Energy Research Foundation, is a water-cooled and moderated, multipurpose research reactor of the closed-tank in-pool type, operated at 45 MW. Performance upgrading comprised two power increases from 20 MW via 30 MW to 45 MW, providing more and higher rated irradiation positions in the tank. With the replacement of the original reactor vessel the experimental capabilities of the reactor were improved. Better pool side facilities and the introduction of a large cross-section, double, beam tube were implemented. Additional major installation upgrading activities consisted of the replacement of the primary and the pool heat exchangers, replacement of the beryllium reflector elements, extension of the overpower protection systems and upgrading of the nuclear instrumentation as well as the guaranteed power supply. Control room upgrading is in progress. A full new safety analysis, as well as the introduction of a comprehensive Quality Assurance system, are summarized under software upgrading. Continuous modernization and upgrading also takes place of equipment for fuel and structural materials irradiations for fission reactors and future fusion machines. In parallel, all supporting services, as well as the management structure for large irradiation programmes, have been developed. Presently the reactor is operating at about 275 full power days per year with an average utilization of the irradiation positions of 70 to 80%. (orig.)

  10. Repairing and Upgrading Your PC

    CERN Document Server

    Thompson, Robert

    2009-01-01

    Repairing and Upgrading Your PC delivers start-to-finish instructions, simple enough for even the most inexperienced PC owner, for troubleshooting, repairing, and upgrading your computer. Written by hardware experts Robert Bruce Thompson and Barbara Fritchman Thompson, this book covers it all: how to troubleshoot a troublesome PC, how to identify which components make sense for an upgrade, and how to tear it all down and put it back together. This book shows how to repair and upgrade all of your PC's essential components.

  11. The backup is active in Alzheimer's disease: a hypothesis from problem theory.

    Science.gov (United States)

    Burnand, Gordon

    2015-03-01

    Problem theory distinguishes between six general problems of everyday life, which people work through in turn during childhood, learning to switch between them. One of them requires the protection of a cut-out and an override. People who develop Alzheimer's disease (AD), and apolipoprotein allele epsilon 4 carriers, are preoccupied with this problem, or readily switch back to it. It is the freedom problem, of raising hope or confidence of freedom or power to control. Here people try to raise hope of success with any task on which attention happens to rest. This indiscriminateness means that there is no basis for giving up on a task, or for avoiding dangerous environments. Thus the cut-out is needed when someone becomes stuck on a mental task and the override is needed so as to help in avoiding danger. Activity relevant to the freedom problem is confined to the left hemisphere and the right hemisphere operates the cut-out and override. In providing these two forms of protection the right hemisphere can be said to act as a backup. Accordingly EEG, metabolism, and atrophy findings indicate that both cut-out and override are active in mild clinical impairment, especially among patients who later develop AD. The pattern of atrophy of AD matches what would be expected from disuse caused by an overactive cut-out followed by an overactive override. A parallel loss of testosterone might contribute to the weakening of resistance to infections leading to autoimmune effects. Copyright © 2015 The Author. Published by Elsevier Ltd.. All rights reserved.

  12. Empirical Analysis of High Efficient Remote Cloud Data Center Backup Using HBase and Cassandra

    OpenAIRE

    Chang, Bao Rong; Tsai, Hsiu-Fen; Chen, Chia-Yen; Guo, Cin-Long

    2015-01-01

    HBase, a master-slave framework, and Cassandra, a peer-to-peer (P2P) framework, are the two most commonly used large-scale distributed NoSQL databases, especially applicable to the cloud computing with high flexibility and scalability and the ease of big data processing. Regarding storage structure, different structure adopts distinct backup strategy to reduce the risks of data loss. This paper aims to realize high efficient remote cloud data center backup using HBase and Cassandra, and in or...

  13. Research and implementation of PC data synchronous backup based on cloud computing

    OpenAIRE

    WU Yu; CHEN Junhua

    2013-01-01

    In order to better ensure data security,data integrity,and facilitate remote management,this paper has designed and implemented a system model for PC data synchronous backup from the view of the local database and personal data. It focuses on the data backup and uses SQL Azure( a cloud database management system) and Visual Studio( a development platform tool) . Also the system is released and deployed on the Windows Azure Platform with a unique web portal. Experimental tests show that compar...

  14. Site initialization, recovery, and back-up in a distributed database system

    International Nuclear Information System (INIS)

    Attar, R.; Bernstein, P.A.; Goodman, N.

    1982-01-01

    Site initialization is the problem of integrating a new site into a running distributed database system (DDBS). Site recovery is the problem of integrating an old site into a DDBS when the site recovers from failure. Site backup is the problem of creating a static backup copy of a database for archival or query purposes. We present an algorithm that solves the site initialization problem. By modifying the algorithm slightly, we get solutions to the other two problems as well. Our algorithm exploits the fact that a correct DDBS must run a serializable concurrency control algorithm. Our algorithm relies on the concurrency control algorithm to handle all inter-site synchronization

  15. How to automatically test and validate your database backup and recovery strategy

    International Nuclear Information System (INIS)

    Gaspar Aparicio, Ruben

    2011-01-01

    The major challenge we solve with this software project is the automated validation of backups sent to tape for Oracle databases. While Oracle Recovery Manager (RMAN) provides tools like 'restore validate', the real and only certain proof is a restore. This initial aim evolved to provide a recovery platform capable to cover more complex user cases, such as validations of backup strategy of Very Large DataBases (VLDB), and schema recoveries to cure logical errors or to provide the kind of database snapshots by means of exports.

  16. Human-machine interface upgrade

    International Nuclear Information System (INIS)

    Kropik, M.; Matejka, K.; Sklenka, L.; Chab, V.

    2002-01-01

    The article describes a new human-machine interface that was installed at the VR-1 training reactor. The human-machine interface upgrade was completed in the summer 2001. The interface was designed with respect to functional, ergonomic and aesthetic requirements. The interface is based on a personal computer equipped with two displays. One display enables alphanumeric communication between the reactor operator and the nuclear reactor I and C. The second display is a graphical one. It presents the status of the reactor, principal parameters (as power, period), control rods positions, course of the reactor power. Furthermore, it is possible to set parameters, to show the active core configuration, to perform reactivity calculations, etc. The software for the new human-machine interface was produced with the InTouch developing tool of the Wonder-Ware Company. It is possible to switch the language of the interface between Czech and English because of many foreign students and visitors to the reactor. Microcomputer based communication units with proper software were developed to connect the new human-machine interface with the present reactor I and C. The new human-machine interface at the VR-1 training reactor improves the comfort and safety of the reactor utilisation, facilitates experiments and training, and provides better support for foreign visitors. (orig.)

  17. ATLAS Detector Upgrade Prospects

    CERN Document Server

    Dobre, Monica; The ATLAS collaboration

    2016-01-01

    After the successful operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, the LHC is ramped up and successfully took data at the center-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The ultimate goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extens...

  18. ATLAS detector upgrade prospects

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00184940; The ATLAS collaboration

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC is ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb$^{-1}$ expected for LHC running to 3000 fb $^{-1}$ by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of ...

  19. LHCb VELO Upgrade

    CERN Document Server

    van Beuzekom, Martin; Ketel, Tjeerd; Gershon, Timothy; Parkes, Christopher; Reid, Matthew

    2011-01-01

    The VErtex LOcator (VELO) is a vital piece of apparatus for allowing precision measurements in hadronic physics. It provides not only superb impact parameter resolutions but also excellent momentum resolution, both important discriminating tools for precision high energy physics. This poster focuses on the R&D going into the future LHCb VELO detector. At present there are two proposed options for the upgrade; pixel chips or strip detectors. The LHCb upgrade is designed with higher luminosities and increased yields in mind. In order to get more out of the LHCb detector changes to the front end electronics will have to be made. At present, the first level hardware trigger is sets a limiting factor on the maximum efficiency for hadronic channels. As the VELO is positioned so close the proton-proton interaction region, whatever the choice of sensor, we will require efficient cooling and some proposed solutions are outlined. The LHCb TimePix telescope has had a very successful years running, with various devic...

  20. ATLAS Detector Upgrade Prospects

    International Nuclear Information System (INIS)

    Dobre, M

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC was ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015 and 2016. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, which will deliver of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb −1 expected for LHC running by the end of 2018 to 3000 fb −1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extensions to larger pseudorapidity, particularly in tracking and muon systems. This report summarizes various improvements to the ATLAS detector required to cope with the anticipated evolution of the LHC luminosity during this decade and the next. A brief overview is also given on physics prospects with a pp centre-of-mass energy of 14 TeV. (paper)

  1. The challenge of localizing vehicle backup alarms: Effects of passive and electronic hearing protectors, ambient noise level, and backup alarm spectral content

    Directory of Open Access Journals (Sweden)

    Khaled A Alali

    2011-01-01

    Full Text Available A human factors experiment employed a hemi-anechoic sound field in which listeners were required to localize a vehicular backup alarm warning signal (both a standard and a frequency-augmented alarm in 360-degrees azimuth in pink noise of 60 dBA and 90 dBA. Measures of localization performance included: (1 percentage correct localization, (2 percentage of right--left localization errors, (3 percentage of front-rear localization errors, and (4 localization absolute deviation in degrees from the alarm′s actual location. In summary, the data demonstrated that, with some exceptions, normal hearing listeners′ ability to localize the backup alarm in 360-degrees azimuth did not improve when wearing augmented hearing protectors (including dichotic sound transmission earmuffs, flat attenuation earplugs, and level-dependent earplugs as compared to when wearing conventional passive earmuffs or earplugs of the foam or flanged types. Exceptions were that in the 90 dBA pink noise, the flat attenuation earplug yielded significantly better accuracy than the polyurethane foam earplug and both the dichotic and the custom-made diotic electronic sound transmission earmuffs. However, the flat attenuation earplug showed no benefit over the standard pre-molded earplug, the arc earplug, and the passive earmuff. Confusions of front-rear alarm directions were most significant in the 90 dBA noise condition, wherein two types of triple-flanged earplugs exhibited significantly fewer front-rear confusions than either of the electronic muffs. On all measures, the diotic sound transmission earmuff resulted in the poorest localization of any of the protectors due to the fact that its single-microphone design did not enable interaural cues to be heard. Localization was consistently more degraded in the 90 dBA pink noise as compared with the relatively quiet condition of the 60 dBA pink noise. A frequency-augmented backup alarm, which incorporated 400 Hz and 4000 Hz components

  2. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  3. Safety upgrading program in NPP Mochovce

    International Nuclear Information System (INIS)

    Baumeister, P.

    1999-01-01

    EMO interest is to operate only nuclear power plants with high standards of nuclear safety. This aim EMO declare on preparation completion and commissioning of Mochovce Nuclear Power Plant. Wide co-operation of our company with International Atomic Energy Agency and west European Inst.ions and companies has been started with aim to fulfil the nuclear safety requirements for Mochovce NPP. Set of 87 safety measures was implemented at Mochovce Unit 1 and is under construction at Unit 2. Mochovce NPP approach to safety upgrading implementation is showed on chosen measures. This presentation is focused on the issues category III.(author)

  4. NPP Krsko Severe Accident Management Guidelines Upgrade

    International Nuclear Information System (INIS)

    Mihalina, Mario; Spalj, Srdjan; Glaser, Bruno; Jalovec, Robi; Jankovic, Gordan

    2014-01-01

    Nuclear Power Plant Krsko (NEK) has decided to take steps for upgrade of safety measures to prevent severe accidents, and to improve the means to successfully mitigate their consequences. The content of the program for the NEK Safety Upgrade is consistent with the nuclear industry response to Fukushima accident, which revealed many new insights into severe accidents. Therefore, new strategies and usage of new systems and components should be integrated into current NEK Severe Accident Management Guidelines (SAMG's). SAMG's are developed to arrest the progression of a core damage accident and to limit the extent of resulting releases of fission products. NEK new SAMG's revision major changes are made due to: replacement of Electrical Recombiners by Passive Autocatalytic Recombiners (PARs) and the installation of Passive Containment Filtered Vent System (PCFV); to handle a fuel damage situation in Spent Fuel Pool (SFP) and to assess risk of core damage situation during shutdown operation. (authors)

  5. LS1: electrical engineering upgrades and consolidation

    International Nuclear Information System (INIS)

    Duval, F.

    2012-01-01

    3 different types of activities are planned by the Engineering Department Electrical Engineering (EN-EL) Group for the first long shut down (LS1). First, the consolidation of EN-EL's ageing infrastructure elements. It is part of a 15- year programme aiming at increasing the reliability and availability of the power distribution network. Secondly, the maintenance of the accelerators infrastructure. In addition to the usual periodic operations and those delayed until LS1, the group will address more demanding activities like the replacement campaigns for irradiated cables and non-radiation resistant fibres as well as the removal of unused cables in particularly overcrowded areas. Thirdly, a vast amount of user copper and optical fibre cabling requests: EN-EL estimates that only 50% of LS1 requests are currently known. The main activities will be EN-EL's contributions to the R2E project, BE-BI upgrade projects, and the RF upgrade project in SPS BA3

  6. Cryomodule development for the CEBAF upgrade

    International Nuclear Information System (INIS)

    J. R. Delayen; L. R. Doolittle; E. Feldl; J. Hogan; J. Mammosser; V. Nguyen; H. L. Phillips; J. Preble; W. J. Scheider; D. X. Wang; M. Wiseman

    1999-01-01

    Long term plans for CEBAF at Jefferson Lab call for achieving 12 GeV in the middle of the next decade and 24 GeV after 2010. In support of these plans, an Upgrade Cryomodule capable of providing more than three times the voltage of the original CEBAF cryomodule specification within the same length is under development. Development activities have been focused on critical areas thought to have maximum impact on the overall design. These have included the cavity structure, rf power coupling, cavity suspension, alignment, cavity tuning, and beamline interface. It has been found that all design and development areas are tightly coupled and can not be developed independently. Substantial progress has been made toward an integrated design for the Jefferson Lab Upgraded Cryomodule

  7. Upgradation of automatic liquid scintillation counting system

    International Nuclear Information System (INIS)

    Bhattacharya, Sadhana; Behere, Anita; Sonalkar, S.Y.; Vaidya, P.P.

    2001-01-01

    This paper describes the upgradation of Microprocessor based Automatic Liquid Scintillation Counting systems (MLSC). This system was developed in 1980's and subsequently many systems were manufactured and supplied to Environment Survey labs at various Nuclear Power Plants. Recently this system has been upgraded to a more sophisticated one by using PC add-on hardware and developing Windows based software. The software implements more intuitive graphical user interface and also enhances the features making it comparable with commercially available systems. It implements data processing using full spectrum analysis as against channel ratio method adopted earlier, improving the accuracy of the results. Also it facilitates qualitative as well as quantitative analysis of the β-spectrum. It is possible to analyze a sample containing an unknown β-source. (author)

  8. ATA upgrade to 150 MeV

    International Nuclear Information System (INIS)

    Birx, D.L.; Hawkins, S.A.; Poor, S.E.; Reginato, L.L.; Smith, M.W.

    1985-01-01

    The increased interests in upgrading the ATA accelerator has warranted a preliminary look at applying the magnetic drivers to achieve both higher energy and higher average power. The goal of this upgrade is to satisfy the FEL requirements and to keep the capability of producing a higher current beam for CPB experiments at reduced energy. ATA Note 247 showed that a possible solution to obtain higher energy was simply to add additional cells, run them at higher voltage and accept a 30 ns pulse width with about 5% energy variation. Considering the recent history of the cells and the doubling of the voltage stress that would be required at the insulator, it seemed prudent to review the overall system reliability and try a different approach

  9. Slum Upgrading and Health Equity.

    Science.gov (United States)

    Corburn, Jason; Sverdlik, Alice

    2017-03-24

    Informal settlement upgrading is widely recognized for enhancing shelter and promoting economic development, yet its potential to improve health equity is usually overlooked. Almost one in seven people on the planet are expected to reside in urban informal settlements, or slums, by 2030. Slum upgrading is the process of delivering place-based environmental and social improvements to the urban poor, including land tenure, housing, infrastructure, employment, health services and political and social inclusion. The processes and products of slum upgrading can address multiple environmental determinants of health. This paper reviewed urban slum upgrading evaluations from cities across Asia, Africa and Latin America and found that few captured the multiple health benefits of upgrading. With the Sustainable Development Goals (SDGs) focused on improving well-being for billions of city-dwellers, slum upgrading should be viewed as a key strategy to promote health, equitable development and reduce climate change vulnerabilities. We conclude with suggestions for how slum upgrading might more explicitly capture its health benefits, such as through the use of health impact assessment (HIA) and adopting an urban health in all policies (HiAP) framework. Urban slum upgrading must be more explicitly designed, implemented and evaluated to capture its multiple global environmental health benefits.

  10. Upgrade trigger: Biannual performance update

    CERN Document Server

    Aaij, Roel; Couturier, Ben; Esen, Sevda; De Cian, Michel; De Vries, Jacco Andreas; Dziurda, Agnieszka; Fitzpatrick, Conor; Fontana, Marianna; Grillo, Lucia; Hasse, Christoph; Jones, Christopher Rob; Le Gac, Renaud; Matev, Rosen; Neufeld, Niko; Nikodem, Thomas; Polci, Francesco; Del Buono, Luigi; Quagliani, Renato; Schwemmer, Rainer; Seyfert, Paul; Stahl, Sascha; Szumlak, Tomasz; Vesterinen, Mika Anton; Wanczyk, Joanna; Williams, Mark Richard James; Yin, Hang; Zacharjasz, Emilia Anna

    2017-01-01

    This document presents the performance of the LHCb Upgrade trigger reconstruction sequence, incorporating changes to the underlying reconstruction algorithms and detector description since the Trigger and Online Upgrade TDR. An updated extrapolation is presented using the most recent example of an Event Filter Farm node.

  11. Do familiar teammates request and accept more backup? Transactive memory in air traffic control.

    Science.gov (United States)

    Smith-Jentsch, Kimberly A; Kraiger, Kurt; Cannon-Bowers, Janis A; Salas, Eduardo

    2009-04-01

    The present study investigated factors that explain when and why different groups of teammates are more likely to request and accept backup from one another when needed in an environment characterized by extreme time pressure and severe consequences of error: commercial air traffic control (ATC). Transactive memory theory states that teammates develop consensus regarding the distribution of their relative expertise as well as confidence in that expertise over time and that this facilitates coordination processes. The present study investigated whether this theory could help to explain between-team differences in requesting and accepting backup when needed. The present study used cross-sectional data collected from 51 commercial ATC teams. Hypotheses were tested using multiple regression analysis. Teammates with greater experience working together requested and accepted backup from one another more than those with lesser experience working together. Teammate knowledge consensus and perceived team efficacy appear to have mediated this relationship. Transactive memory theory extends to high-stress environments in which members' expertise is highly overlapping. Teammates' shared mental models about one another increase the likelihood that they will request and accept backup. Teammate familiarity should be considered when choosing among potential replacement team members. Training strategies that accelerate the development of teammate knowledge consensus and team efficacy are warranted.

  12. An efficient hybrid protection scheme with shared/dedicated backup paths on elastic optical networks

    Directory of Open Access Journals (Sweden)

    Nogbou G. Anoh

    2017-02-01

    Full Text Available Fast recovery and minimum utilization of resources are the two main criteria for determining the protection scheme quality. We address the problem of providing a hybrid protection approach on elastic optical networks under contiguity and continuity of available spectrum constraints. Two main hypotheses are used in this paper for backup paths computation. In the first case, it is assumed that backup paths resources are dedicated. In the second case, the assumption is that backup paths resources are available shared resources. The objective of the study is to minimize spectrum utilization to reduce blocking probability on a network. For this purpose, an efficient survivable Hybrid Protection Lightpath (HybPL algorithm is proposed for providing shared or dedicated backup path protection based on the efficient energy calculation and resource availability. Traditional First-Fit and Best-Fit schemes are employed to search and assign the available spectrum resources. The simulation results show that HybPL presents better performance in terms of blocking probability, compared with the Minimum Resources Utilization Dedicated Protection (MRU-DP algorithm which offers better performance than the Dedicated Protection (DP algorithm.

  13. Backup Sourcing Decisions for Coping with Supply Disruptions under Long-Term Horizons

    Directory of Open Access Journals (Sweden)

    Jing Hou

    2016-01-01

    Full Text Available This paper studies a buyer’s inventory control problem under a long-term horizon. The buyer has one major supplier that is prone to disruption risks and one backup supplier with higher wholesale price. Two kinds of sourcing methods are available for the buyer: single sourcing with/without contingent supply and dual sourcing. In contingent sourcing, the backup supplier is capacitated and/or has yield uncertainty, whereas in dual sourcing the backup supplier has an incentive to offer output flexibility during disrupted periods. The buyer’s expected cost functions and the optimal base-stock levels using each sourcing method under long-term horizon are obtained, respectively. The effects of three risk parameters, disruption probability, contingent capacity or uncertainty, and backup flexibility, are examined using comparative studies and numerical computations. Four sourcing methods, namely, single sourcing with contingent supply, dual sourcing, and single sourcing from either of the two suppliers, are also compared. These findings can be used as a valuable guideline for companies to select an appropriate sourcing strategy under supply disruption risks.

  14. STS-9 payload specialist Merbold and backup Ockels in training session

    Science.gov (United States)

    1983-01-01

    STS-9 payload specialist Ulf Merbold, right, a West German physicist and backup Wubbo Ockels, a Dutch scientist, are pictured in a training session in JSC's Shuttle mockup and integration laboratory. In this view Ockels appears to be showing Merbold how to operate a camera.

  15. 30 CFR 75.1101-21 - Back-up water system.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Back-up water system. 75.1101-21 Section 75.1101-21 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY... water system. One fire hose outlet together with a length of hose capable of extending to the belt drive...

  16. Upgrading the ATLAS control system

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.

    1993-01-01

    Heavy-ion accelerators are tools used in the research of nuclear and atomic physics. The ATLAS facility at the Argonne National Laboratory is one such tool. The ATLAS control system serves as the primary operator interface to the accelerator. A project to upgrade the control system is presently in progress. Since this is an upgrade project and not a new installation, it was imperative that the development work proceed without interference to normal operations. An additional criteria for the development work was that the writing of additional ''in-house'' software should be kept to a minimum. This paper briefly describes the control system being upgraded, and explains some of the reasons for the decision to upgrade the control system. Design considerations and goals for the new system are described, and the present status of the upgrade is discussed

  17. LHC luminosity upgrade detector challenges

    CERN Multimedia

    CERN. Geneva; de Roeck, Albert; Bortoletto, Daniela; Wigmans, Richard; Riegler, Werner; Smith, Wesley H

    2006-01-01

    LHC luminosity upgrade: detector challenges The upgrade of the LHC machine towards higher luminosity (1035 cm -2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: • Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) • Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector developments (lectures 2-4) • Electronics, trigger and data acquisition challenges (lecture 5) Note: the much more ambitious LHC energy upgrade will not be covered

  18. Computer codes used during upgrading activities at MINT TRIGA reactor

    International Nuclear Information System (INIS)

    Mohammad Suhaimi Kassim; Adnan Bokhari; Mohd Idris Taib

    1999-01-01

    MINT TRIGA Reactor is a 1-MW swimming pool nuclear research reactor commissioned in 1982. In 1993, a project was initiated to upgrade the thermal power to 2 MW. The IAEA assistance was sought to assist the various activities relevant to an upgrading exercise. For neutronics calculations, the IAEA has provided expert assistance to introduce the WIMS code, TRIGAP, and EXTERMINATOR2. For thermal-hydraulics calculations, PARET and RELAP5 were introduced. Shielding codes include ANISN and MERCURE. However, in the middle of 1997, MINT has decided to change the scope of the project to safety upgrading of the MINT Reactor. This paper describes some of the activities carried out during the upgrading process. (author)

  19. The Fermilab ACNET upgrade

    International Nuclear Information System (INIS)

    Briegel, C.; Johnson, G.; Winterowd, L.

    1990-01-01

    The Fermilab Accelerator Controls Network (ACNET) upgrade consists of a new physical medium (IEEE 802.5 token ring), additions to the calling sequence and added processor support. ACNET is the accelerator control backbone network for all data communication. A proprietary network was replaced by an IEEE standard enabling an open network with excellent characteristics for the control system. The calling sequence was enhanced for the added capabilities of the token-ring interface such as 'gather-read' and 'scatter-write'. In addition to prior support of DEC PDP11s under RS11M and VAXs under VMS, the ACNET calling sequence was implemented in the language C for the IBM PC with MS-DOS and Motorola 680x0 with MTOS using VME bus. Additional support is in progress for Intel 80x86 with MTOS using Multibus II. (orig.)

  20. Structural seismic upgrading of NPPs in Czech and Slovak republics

    Energy Technology Data Exchange (ETDEWEB)

    David, M [DAVID Consulting, Engineering and Design Office, Prague (Czech Republic)

    1997-03-01

    Several Nuclear Power Plants of the VVER type has been constructed during the past years in former Czechoslovak Republic. Some of them has been already put in operation and some of them are under construction. Nuclear Power Plants V1(2 units of VVER 440/230), V2(2 units of VVER 440/213) in Slovak and NPP Dukovany (4 units of VVER 440/213) in Czech republic are in operation. NPP Mochovce (4 units of VVER 440/213) in Slovak and NPP Temelin (4 units reduced now to 2 units VVER 1000) have been already almost completed, but still under construction. All above cited NPPs have not been either explicitly designed against earthquake or the design against earthquake or its input data must be upgraded to be compatible with present requirements. The upgrading of seismic input as well the seismic upgrading of all structures and technological equipments for so many NPPs has involved a lot of comprehensive work in Czech as well as in Slovak republics. The upgrading cannot be completed in a short time and as a rule the seismic upgrading has been usually performed in several steps, beginning with the most important arrangements against seismic hazard. The basic principles and requirements for seismic upgrading has been defined in accordance with the international and particularly with the IAEA recommendations. About the requirements for seismic upgrading of NPPs in Czech and Slovak republics will be reported in other contribution. This contribution is dealing with the problems of seismic upgrading of NNPs civil engineering structures. The aim of this contribution is to point out some specific problems connected firstly with very complicated concept of Versa structures and secondly with the difficult task to increase the structural capacity to the required seismic level. (J.P.N.)

  1. Structural seismic upgrading of NPPs in Czech and Slovak republics

    International Nuclear Information System (INIS)

    David, M.

    1997-01-01

    Several Nuclear Power Plants of the VVER type has been constructed during the past years in former Czechoslovak Republic. Some of them has been already put in operation and some of them are under construction. Nuclear Power Plants V1(2 units of VVER 440/230), V2(2 units of VVER 440/213) in Slovak and NPP Dukovany (4 units of VVER 440/213) in Czech republic are in operation. NPP Mochovce (4 units of VVER 440/213) in Slovak and NPP Temelin (4 units reduced now to 2 units VVER 1000) have been already almost completed, but still under construction. All above cited NPPs have not been either explicitly designed against earthquake or the design against earthquake or its input data must be upgraded to be compatible with present requirements. The upgrading of seismic input as well the seismic upgrading of all structures and technological equipments for so many NPPs has involved a lot of comprehensive work in Czech as well as in Slovak republics. The upgrading cannot be completed in a short time and as a rule the seismic upgrading has been usually performed in several steps, beginning with the most important arrangements against seismic hazard. The basic principles and requirements for seismic upgrading has been defined in accordance with the international and particularly with the IAEA recommendations. About the requirements for seismic upgrading of NPPs in Czech and Slovak republics will be reported in other contribution. This contribution is dealing with the problems of seismic upgrading of NNPs civil engineering structures. The aim of this contribution is to point out some specific problems connected firstly with very complicated concept of Versa structures and secondly with the difficult task to increase the structural capacity to the required seismic level. (J.P.N.)

  2. Upgrading of PWR plant simulators

    International Nuclear Information System (INIS)

    Wada, Tomonori; Sasaki, Kazunori; Nakaishi, Hirokazu.

    1989-01-01

    For the education and training of operators in electric power plants, simulators have been employed, and it is well known that their effect is great. There are operation training simulators which simulate the dynamic characteristics of plants and all the machinery and equipment that operators handle, and train the procedure of restoration at the time of abnormality in plants, education simulators which can analyze the dynamic characteristics of plants efficiently in a short time, and offer information by visualizing phenomena with three-dimensional display and others so as to be easily understandable, and forecast simulators which do the analysis forecasting plant behavior at the time of abnormality in plants, and investigate the necessity of the guide for operation procedure and the countermeasures at the time of emergency. In this explanation, the upgrading of operation training simulators which have been put already in training is discussed. The constitution of simulator system and the instructor function, the outline of PWR plant simulation models comprising thermal flow model, pump model, leak model and so on, the techniques of increasing simulator speed, and the example of analysis using the NUPAC code are reported. (K.I.)

  3. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Jeitler, Manfred; Rabady, Dinyar; Sakulin, Hannes; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run-II of the Large Hadron Collider poses new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run-I, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new μTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (μGMT) which sorts and removes duplicates from boundaries of the muon trigger sub-systems. Furthermore, it determines how isolated the muon candidates are based on calorimetric energy deposits. The μGMT will be implemented using a processing board that features a larg...

  4. Actuator management for ECRH at ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Rapson, Christopher J., E-mail: chris.rapson@ipp.mpg.de; Reich, Matthias; Stober, Joerg; Treutterer, Wolfgang

    2015-10-15

    Highlights: • Real-time actuator management algorithm developed for ECRH at ASDEX Upgrade. • First use of a control hierarchy in a fusion experiment. • Cost function evaluates optimal combination of all gyrotrons to all possible targets. • Considers many factors e.g. mirror movement, power available, presence and mode number of NTMs. • Configurable, robust algorithm is ready for online testing. - Abstract: Automated actuator management will be necessary on long pulse fusion experiments to adjust to unforeseen plasma events and unpredictable actuator availability. However, as a control problem, actuator management is underdeveloped in the fusion community. This contribution proposes an algorithm based on a control hierarchy and a cost function to optimally allocate scarce actuator resources to various objectives in real-time. Details are given on the development and offline testing which have been completed ready for deployment at ASDEX Upgrade. Electron Cyclotron Resonance Heating (ECRH) is particularly relevant for actuator management due to its localised deposition which can flexibly target specific regions of the plasma for different effects such as non-inductive current drive, impurity regulation, control of MHD modes and of course heating. A further motivation is that automated actuator management will simplify the setup of ECRH, in keeping with the long term goal of integrating MHD control as a routine part of ASDEX Upgrade experiments.

  5. Actuator management for ECRH at ASDEX Upgrade

    International Nuclear Information System (INIS)

    Rapson, Christopher J.; Reich, Matthias; Stober, Joerg; Treutterer, Wolfgang

    2015-01-01

    Highlights: • Real-time actuator management algorithm developed for ECRH at ASDEX Upgrade. • First use of a control hierarchy in a fusion experiment. • Cost function evaluates optimal combination of all gyrotrons to all possible targets. • Considers many factors e.g. mirror movement, power available, presence and mode number of NTMs. • Configurable, robust algorithm is ready for online testing. - Abstract: Automated actuator management will be necessary on long pulse fusion experiments to adjust to unforeseen plasma events and unpredictable actuator availability. However, as a control problem, actuator management is underdeveloped in the fusion community. This contribution proposes an algorithm based on a control hierarchy and a cost function to optimally allocate scarce actuator resources to various objectives in real-time. Details are given on the development and offline testing which have been completed ready for deployment at ASDEX Upgrade. Electron Cyclotron Resonance Heating (ECRH) is particularly relevant for actuator management due to its localised deposition which can flexibly target specific regions of the plasma for different effects such as non-inductive current drive, impurity regulation, control of MHD modes and of course heating. A further motivation is that automated actuator management will simplify the setup of ECRH, in keeping with the long term goal of integrating MHD control as a routine part of ASDEX Upgrade experiments.

  6. H-1 Upgrades (4BW/4BN) (H-1 Upgrades)

    Science.gov (United States)

    2015-12-01

    automatic blade fold of the new composite rotor blades, new performance matched transmissions, a new four-bladed tail rotor and drive system, upgraded...Upgrades December 2015 SAR March 18, 2016 10:59:17 UNCLASSIFIED 4 Col Steven Girard PMA-276 USMC Light/Attack Helicopter Program Executive Officer...attack helicopter is to provide rotary wing close air support, anti-armor, armed escort, armed/visual reconnaissance and fire support coordination

  7. Analysis design and implementation of a data backup system and restoration of information based on AVAMAR Software

    Directory of Open Access Journals (Sweden)

    Wilson Chango

    2017-12-01

    Full Text Available The objective of this research is to make a system for the backup of the information of virtual environments and computers of end users through the LAN network, covering, for this purpose, the analysis, design and implementation at the laboratory level, of a system of specialized backups for these environments in this way was thus checked for its performance and its feasibility of execution, from a technical point of view. AVAMAR, emerges as a solution alternative to face the challenges of those IT environments where backups and retrieval of information demand shorter time windows, more agile recovery responses, end user support and virtual machines. The architecture and technology of this backup and recovery solution makes it ideal for a reference study that shows everything that can be achieved in the complex and varied world of information backup. The scenario that was raised concerns a typical infrastructure consisting of physical, virtual servers, a LAN and a SAN network, users of desktop computers and laptops, end users had connectivity to the servers through the LAN, these computer equipment had Windows as an operating system, a virtual environment was established that was executed on the physical servers, the environment was fully operational and functional, all services were active and users could access them from the LAN network . From this scenario, we analyzed the benefits of the system of backups of the information of end users and virtual machines, optimizing resources such as hardware, software and execution time of backup and recovery tasks

  8. The Atlas upgrade project

    International Nuclear Information System (INIS)

    Bollinger, L.M.

    1988-01-01

    ATLAS is a heavy-ion accelerator system consisting of a 9-MV tandem electrostatic injector coupled to a superconducting linac. A project now well advanced will upgrade the capabilities of ATLAS immensely by replacing the tandem and its negative-ion source with a positive-ion injector that consists of an electron-cyclotron resonance (ECR) ion source and a 12-MV superconducting injector linac of novel design. This project will increase the beam intensity 100 fold and will extend the projectile-mass range up to uranium. Phase 1 of the work, which is nearing completion in late 1988, will provide an injector comprising the ECR source and its 350-kV voltage platform, beam analysis and bunching systems, beam lines, and a prototype 3-MV linac. The ECR source and its voltage platform are operational, development of the new class of low-frequency interdigital superconducting resonators required for the injector linac has been completed, and assembly of the whole system is in progress. Test runs and then routine use of the Phase 1 injector systems are planned for early 1989, and the final 12-MV injector linac will be commissioned in 1990. 12 refs., 6 figs

  9. Altair performance and upgrades

    Science.gov (United States)

    Lai, Olivier; Véran, Jean-Pierre; Herriot, Glen; White, John; Ball, Jesse; Trujillo, Chad

    2014-07-01

    Altair is the facility single conjugate AO system for Gemini North. Although it has been in operation for more than 10 years (and upgraded to LGS in 2007), Altair's performance is degraded by three main issues: vibrations of the telescope and instrument support structure, spatial aliasing on centroid offsets from the M2 support structure print-through on the optical surface and static non-common path aberrations. Monte-Carlo simulations can reproduce the behavior of Altair when including these three effects and they are roughly of the same order of magnitude. Solutions or mitigations are being investigated to overcome these nefarious effects and restore Altair's performance to its nominal level. A simplex algorithm as well as a phase diversity approach are being investigated to measure and correct for static aberrations. A high accuracy phase map of the M2 print-through has been obtained and is being used to calibrate and/or filter centroids affected by aliasing. A new real time computer is under consideration, to be able to handle more advanced controllers, especially notch filters to combat vibrations. In this paper we will report on the various simulations and on-sky results of this rejuvenation of one of Gemini's workhorse instruments.

  10. Alberta propylene upgrading prospects

    International Nuclear Information System (INIS)

    2000-03-01

    A very significant byproduct recovery and purification scheme is at present being prepared by TransCanada Midstream (TCMS). Alberta Economic Development commissioned an independent study to identify propylene supply options while proceeding with the evaluation of various propylene derivatives with regard to their fit with the Alberta context. Identification of chemical companies with derivative interests was also accomplished. By 2005, it is estimated that 280 kilo-tonnes of propylene will be available on an annual basis from byproduct sources. Those sources are oil sands upgraders, ethylene plants and refineries. The ranges of impurities and supply costs vary between the different sources. An option being considered involves pipeline and rail receipt with a major central treating and distillation facility for the production of polymer grade (PG) propylene with propane and other smaller byproducts. Special consideration was given to three chemicals in this study, namely: polypropylene (PP), acrylonitrile (ACN), and acrylic acid (AA). Above average growth rates were identified for these chemicals: demand is growing at 6 to 7 per cent a year for both PP and ACN, while demand for AA grows at 8 per cent annually. Two other possibilities were identified, propylene oxide (PO) and phenol. The study led to the conclusion that low capital and operating costs and shipping costs to the Pacific Rim represent advantages to the development of propylene derivatives in the future in Alberta. 4 refs., 87 tabs., 7 figs

  11. Progress and plan of KSTAR plasma control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, Sang-hee, E-mail: hahn76@nfri.re.kr [National Fusion Research Institute, Daejeon (Korea, Republic of); Kim, Y.J. [National Fusion Research Institute, Daejeon (Korea, Republic of); Penaflor, B.G. [General Atomics, San Diego, CA (United States); Bak, J.G.; Han, H.; Hong, J.S.; Jeon, Y.M.; Jeong, J.H.; Joung, M.; Juhn, J.W.; Kim, J.S.; Kim, H.S.; Lee, W.R.; Woo, M.H. [National Fusion Research Institute, Daejeon (Korea, Republic of); Eidietis, N.W.; Ferron, J.R.; Humphreys, D.A.; Hyatt, A.; Johnson, R.D.; Piglowski, D.A. [General Atomics, San Diego, CA (United States); and others

    2016-11-15

    Highlights: • Recent achievements of the KSTAR plasma control system are described. • Requirements and results of the testbed system for the future upgrade of the KSTAR plasma control system are presented. • An overview of the upgrade layout based is given. - Abstract: The plasma control system (PCS) has been one of essential systems in annual KSTAR plasma campaigns: starting from a single-process version in 2008, extensive upgrades are done through the previous 7 years in order to achieve major goals of KSTAR performance enhancement. Major implementations are explained in this paper. In consequences of successive upgrades, the present KSTAR PCS is able to achieve ∼48 s of 500 kA plasma pulses with full real-time shaping controls and real-time NB power controls. It has become a huge system capable of dealing with 8 separate categories of algorithms, 26 actuators directly controllable during the shot, and real-time data communication units consisting of +180 analog channels and +600 digital input/outputs through the reflective memory (RFM) network. The next upgrade of the KSTAR PCS is planned in 2015 before the campaign. An overview of the upgrade layout will be given for this paper. The real-time system box is planned to use the CERN MRG-Realtime OS, an ITER-compatible standard operating system. New hardware is developed for faster real-time streaming system for future installations of actuators/diagnostics.

  12. Mongolia - Vocational Education - Equipment Upgrades

    Data.gov (United States)

    Millennium Challenge Corporation — Evaluation design The impact evaluation sought to identify the causal impact of exposure to equipment upgrades on subsequent outcomes. Insofar as we were not able to...

  13. Mining Upgrades to Reduce Pollution

    Science.gov (United States)

    Settlement with Southern Coal Corporation and 26 affiliates requires the companies to comprehensively upgrade their coal mining and processing operations to prevent polluted wastewater from threatening rivers and streams and communities across Appalachia.

  14. Quasi Path Restoration: A post-failure recovery scheme over pre-allocated backup resource for elastic optical networks

    Science.gov (United States)

    Yadav, Dharmendra Singh; Babu, Sarath; Manoj, B. S.

    2018-03-01

    Spectrum conflict during primary and backup routes assignment in elastic optical networks results in increased resource consumption as well as high Bandwidth Blocking Probability. In order to avoid such conflicts, we propose a new scheme, Quasi Path Restoration (QPR), where we divide the available spectrum into two: (1) primary spectrum (for primary routes allocation) and (2) backup spectrum (for rerouting the data on link failures). QPR exhibits three advantages over existing survivable strategies such as Shared Path Protection (SPP), Primary First Fit Backup Last Fit (PFFBLF), Jointly Releasing and re-establishment Defragmentation SPP (JRDSSPP), and Path Restoration (PR): (1) the conflict between primary and backup spectrum during route assignment is completely eliminated, (2) upon a link failure, connection recovery requires less backup resources compared to SPP, PFFBLF, and PR, and (3) availability of the same backup spectrum on each link improves the recovery guarantee. The performance of our scheme is analyzed with different primary backup spectrum partitions on varying connection-request demands and number of frequency slots. Our results show that QPR provides better connection recovery guarantee and Backup Resources Utilization (BRU) compared to bandwidth recovery of PR strategy. In addition, we compare QPR with Shared Path Protection and Primary First-Fit Backup Last Fit strategies in terms of Bandwidth Blocking Probability (BBP) and average frequency slots per connection request. Simulation results show that BBP of SPP, PFFBLF, and JRDSPP varies between 18.59% and 14.42%, while in QPR, BBP ranges from 2.55% to 17.76% for Cost239, NSFNET, and ARPANET topologies. Also, QPR provides bandwidth recovery between 93.61% and 100%, while in PR, the recovery ranges from 86.81% to 98.99%. It is evident from our analysis that QPR provides a reasonable trade-off between bandwidth blocking probability and connection recoverability.

  15. Fermilab linac upgrade. Module conditioning results

    International Nuclear Information System (INIS)

    Kroc, T.; Moretti, A.; Popovic, M.

    1992-01-01

    The 805 MHz side-coupled cavity modules for the Fermilab 400 MeV linac upgrade have been conditioned to accept full power. The sparking rate in the cavities and in the side cells has been reduced to acceptable levels. It required approximately 40 x 10 6 pulses for each module to achieve an adequately low sparking rate. This contribution outlines the commissioning procedure, presents the sparking rate improvements and the radiation level improvements through the commissioning process and discusses the near-on-line commissioning plans for this accelerator. (Author) ref., 4 figs

  16. Fermilab Linac Upgrade: Module conditioning results

    International Nuclear Information System (INIS)

    Kroc, T.; Moretti, A.; Popovic, M.

    1992-12-01

    The 805 MHz Side-coupled cavity modules for the Fermilab 400 MeV linac upgrade have been conditioned to accept full power. The sparking rate in the cavities and in the side-cells has been reduced to acceptable levels. It required approximately 40 x 10 6 pulses for each module to achieve an adequately low sparking rate. This contribution outlines the commissioning procedure, presents the sparking rate improvements and the radiation level improvements through the commissioning process and disc the near-online commissioning plans for this accelerator

  17. Silicon Tracking Upgrade at CDF

    International Nuclear Information System (INIS)

    Kruse, M.C.

    1998-04-01

    The Collider Detector at Fermilab (CDF) is scheduled to begin recording data from Run II of the Fermilab Tevatron in early 2000. The silicon tracking upgrade constitutes both the upgrade to the CDF silicon vertex detector (SVX II) and the new Intermediate Silicon Layers (ISL) located at radii just beyond the SVX II. Here we review the design and prototyping of all aspects of these detectors including mechanical design, data acquisition, and a trigger based on silicon tracking

  18. WNP-2 core model upgrade

    International Nuclear Information System (INIS)

    Golightly, C.E.; Ravindranath, T.K.; Belblidia, L.A.; O'Farrell, D.; Andersen, P.S.

    2006-01-01

    The paper describes the core model upgrade of the WNP-2 training simulator and the reasons for the upgrade. The core model as well as the interface with the rest of the simulator are briefly described . The paper also describes the procedure that will be used by WNP-2 to update the simulator core data after future core reloads. Results from the fully integrated simulator are presented. (author)

  19. Analysis of integrated plant upgrading/life extension programs

    International Nuclear Information System (INIS)

    McCutchan, D.A.; Massie, H.W. Jr.; McFetridge, R.H.

    1988-01-01

    A present-worth generating cost model has been developed and used to evaluate the economic value of integrated plant upgrading life extension project in nuclear power plants. This paper shows that integrated plant upgrading programs can be developed in which a mix of near-term availability, power rating, and heat rate improvements can be obtained in combination with life extension. All significant benefits and costs are evaluated from the viewpoint of the utility, as measured in discounted revenue requirement differentials between alternative plans which are equivalent in system generating capacity. The near-term upgrading benefits are shown to enhance the benefit picture substantially. In some cases the net benefit is positive, even if the actual life extension proves to be less than expected

  20. Pakistan upgrades PARR-1 and converts to LEU

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    The Pakistan Research Reactor, PARR-1, is a 5MW swimming pool type reactor originally designed to use MTR type fuel elements fabricated from uranium enriched to more than 90%. After about 24 years of satisfactory operation it is now planned to convert the reactor to use low enriched (20%) uranium fuel. The opportunity will also be taken to upgrade the reactor power to about 9MW. This power upgrading will meet the demand for higher neutron fluxes for experimental and radioisotope production as well as compensating for the neutron flux penalty arising from conversion from high enriched to low enriched fuel. During the process of conversion and upgrading it is also proposed to renovate existing services and associated systems and to add certain new safety related engineering. (author)

  1. Setting priorities for safeguards upgrades

    International Nuclear Information System (INIS)

    Al-Ayat, R.A.; Judd, B.R.; Patenaude, C.J.; Sicherman, A.

    1987-01-01

    This paper describes an analytic approach and a computer program for setting priorities among safeguards upgrades. The approach provides safeguards decision makers with a systematic method for allocating their limited upgrade resources. The priorities are set based on the upgrades cost and their contribution to safeguards effectiveness. Safeguards effectiveness is measured by the probability of defeat for a spectrum of potential insider and outsider adversaries. The computer program, MI$ER, can be used alone or as a companion to ET and SAVI, programs designed to evaluate safeguards effectiveness against insider and outsider threats, respectively. Setting the priority required judgments about the relative importance (threat likelihoods and consequences) of insider and outsider threats. Although these judgments are inherently subjective, MI$ER can analyze the sensitivity of the upgrade priorities to these weights and determine whether or not they are critical to the priority ranking. MI$ER produces tabular and graphical results for comparing benefits and identifying the most cost-effective upgrades for a given expenditure. This framework provides decision makers with an explicit and consistent analysis to support their upgrades decisions and to allocate the safeguards resources in a cost-effective manner

  2. Status of the University of Missouri-Columbia Research Reactor upgrade

    Energy Technology Data Exchange (ETDEWEB)

    McKibben, J C; Edwards, Jr, C B; Meyer, Jr, W A [MU Research Reactor, Columbia, MO (United States); Kim, S S [Idaho Nuclear Engineering Laboratory, Idaho Falls, ID (United States)

    1990-05-01

    The University of Missouri-Columbia (MU) Research Reactor Facility staff is in the process of upgrading the operational and research capabilities of the reactor and associated facilities. The upgrades include an extended life aluminide fuel element, a power increase, improved instrumentation and control equipment, a cold neutron source, a building addition, and improved research instrumentation and equipment. These upgrades will greatly enhance the capabilities of the facility and the research programs. This paper discusses the parts of the upgrade and current status of implementation. (author)

  3. Status of the University of Missouri-Columbia Research Reactor upgrade

    International Nuclear Information System (INIS)

    McKibben, J.C.; Edwards, C.B. Jr.; Meyer, W.A. Jr.; Kim, S.S.

    1990-01-01

    The University of Missouri-Columbia (MU) Research Reactor Facility staff is in the process of upgrading the operational and research capabilities of the reactor and associated facilities. The upgrades include an extended life aluminide fuel element, a power increase, improved instrumentation and control equipment, a cold neutron source, a building addition, and improved research instrumentation and equipment. These upgrades will greatly enhance the capabilities of the facility and the research programs. This paper discusses the parts of the upgrade and current status of implementation. (author)

  4. Planning of Vehicle Routing with Backup Provisioning Using Wireless Sensor Technologies

    Directory of Open Access Journals (Sweden)

    Noélia Correia

    2017-08-01

    Full Text Available Wireless sensor technologies can be used by intelligent transportation systems to provide innovative services that lead to improvements in road safety and congestion, increasing end-user satisfaction. In this article, we address vehicle routing with backup provisioning, where the possibility of reacting to overloading/overcrowding of vehicles at certain stops is considered. This is based on the availability of vehicle load information, which can be captured using wireless sensor technologies. After discussing the infrastructure and monitoring tool, the problem is mathematically formalized, and a heuristic algorithm using local search procedures is proposed. Results show that planning routes with backup provisioning can allow fast response to overcrowding while reducing costs. Therefore, sustainable urban mobility, with efficient use of resources, can be provided while increasing the quality of service perceived by users.

  5. Multicast backup reprovisioning problem for Hamiltonian cycle-based protection on WDM networks

    Science.gov (United States)

    Din, Der-Rong; Huang, Jen-Shen

    2014-03-01

    As networks grow in size and complexity, the chance and the impact of failures increase dramatically. The pre-allocated backup resources cannot provide 100% protection guarantee when continuous failures occur in a network. In this paper, the multicast backup re-provisioning problem (MBRP) for Hamiltonian cycle (HC)-based protection on WDM networks for the link-failure case is studied. We focus on how to recover the protecting capabilities of Hamiltonian cycle against the subsequent link-failures on WDM networks for multicast transmissions, after recovering the multicast trees affected by the previous link-failure. Since this problem is a hard problem, an algorithm, which consists of several heuristics and a genetic algorithm (GA), is proposed to solve it. The simulation results of the proposed method are also given. Experimental results indicate that the proposed algorithm can solve this problem efficiently.

  6. The Unparalleled Systems Engineering of MSL's Backup Entry, Descent, and Landing System: Second Chance

    Science.gov (United States)

    Roumeliotis, Chris; Grinblat, Jonathan; Reeves, Glenn

    2013-01-01

    Second Chance (SECC) was a bare bones version of Mars Science Laboratory's (MSL) Entry Descent & Landing (EDL) flight software that ran on Curiosity's backup computer, which could have taken over swiftly in the event of a reset of Curiosity's prime computer, in order to land her safely on Mars. Without SECC, a reset of Curiosity's prime computer would have lead to catastrophic mission failure. Even though a reset of the prime computer never occurred, SECC had the important responsibility as EDL's guardian angel, and this responsibility would not have seen such success without unparalleled systems engineering. This paper will focus on the systems engineering behind SECC: Covering a brief overview of SECC's design, the intense schedule to use SECC as a backup system, the verification and validation of the system's "Do No Harm" mandate, the system's overall functional performance, and finally, its use on the fateful day of August 5th, 2012.

  7. NASA Glenn's Single-Stage Axial Compressor Facility Upgraded

    Science.gov (United States)

    Brokopp, Richard A.

    2004-01-01

    NASA Glenn Research Center's Single-Stage Axial Compressor Facility was upgraded in fiscal year 2003 to expand and improve its research capabilities for testing high-speed fans and compressors. The old 3000-hp drive motor and gearbox were removed and replaced with a refurbished 7000-hp drive motor and gearbox, with a maximum output speed of 21,240 rpm. The higher horsepower rating permits testing of fans and compressors with higher pressure ratio or higher flow. A new inline torquemeter was installed to provide an alternate measurement of fan and compressor efficiency, along with the standard pressure and temperature measurements. A refurbished compressor bearing housing was also installed with bidirectional rotation capability, so that a variety of existing hardware could be tested. Four new lubrication modules with backup capability were installed for the motor, gearbox, torquemeter, and compressor bearing housing, so that in case the primary pump fails, the backup will prevent damage to the rotating hardware. The combustion air supply line for the facility inlet air system was activated to provide dry air for repeatable inlet conditions. New flow conditioning hardware was installed in the facility inlet plenum tank, which greatly reduced the inlet turbulence. The new inlet can also be easily modified to accommodate 20- or 22-in.-diameter fans and compressors, so a variety of existing hardware from other facilities (such as Glenn's 9- by 15-Foot Low-Speed Wind Tunnel) can be tested in the Single-Stage Axial Compressor Facility. An exhaust line was also installed to provide bleed capability to remove the inlet boundary layer. To improve the operation and control of the facility, a new programmable logic controller (PLC) was installed to upgrade from hardwired relay logic to software logic. The PLC also enabled the usage of human-machine interface software to allow for easier operation of the facility and easier reconfiguration of the facility controls when

  8. Data Back-Up and Recovery Techniques for Cloud Server Using Seed Block Algorithm

    OpenAIRE

    R. V. Gandhi; M Seshaiah

    2015-01-01

    In cloud computing, data generated in electronic form are large in amount. To maintain this data efficiently, there is a necessity of data recovery services. To cater this, we propose a smart remote data backup algorithm, Seed Block Algorithm. The objective of proposed algorithm is twofold; first it help the users to collect information from any remote location in the absence of network connectivity and second to recover the files in case of the file deletion or if the cloud gets ...

  9. DOMe: A deduplication optimization method for the NewSQL database backups.

    Directory of Open Access Journals (Sweden)

    Longxiang Wang

    Full Text Available Reducing duplicated data of database backups is an important application scenario for data deduplication technology. NewSQL is an emerging database system and is now being used more and more widely. NewSQL systems need to improve data reliability by periodically backing up in-memory data, resulting in a lot of duplicated data. The traditional deduplication method is not optimized for the NewSQL server system and cannot take full advantage of hardware resources to optimize deduplication performance. A recent research pointed out that the future NewSQL server will have thousands of CPU cores, large DRAM and huge NVRAM. Therefore, how to utilize these hardware resources to optimize the performance of data deduplication is an important issue. To solve this problem, we propose a deduplication optimization method (DOMe for NewSQL system backup. To take advantage of the large number of CPU cores in the NewSQL server to optimize deduplication performance, DOMe parallelizes the deduplication method based on the fork-join framework. The fingerprint index, which is the key data structure in the deduplication process, is implemented as pure in-memory hash table, which makes full use of the large DRAM in NewSQL system, eliminating the performance bottleneck problem of fingerprint index existing in traditional deduplication method. The H-store is used as a typical NewSQL database system to implement DOMe method. DOMe is experimentally analyzed by two representative backup data. The experimental results show that: 1 DOMe can reduce the duplicated NewSQL backup data. 2 DOMe significantly improves deduplication performance by parallelizing CDC algorithms. In the case of the theoretical speedup ratio of the server is 20.8, the speedup ratio of DOMe can achieve up to 18; 3 DOMe improved the deduplication throughput by 1.5 times through the pure in-memory index optimization method.

  10. Upgrading inflatable door seals

    International Nuclear Information System (INIS)

    Sykes, T.M.; Metcalfe, R.; Welch, L.A.; Josefowich, J.M.

    1997-01-01

    Inflatable door seals are used for airlocks in CANDU stations. They have been a significant source of unreliability and maintenance cost. A program is underway to improve their performance and reliability, backed by environmental qualification testing. Only commercial products and suppliers existed in 1993. For historical reasons, these 'existing products' did not use the most durable material then available. In hindsight, neither had they been adapted nor optimized to combat conditions often experienced in the plants-sagging doors, damaged sealing surfaces, and many thousands of openings and closings per year. Initial attempts to involve the two existing suppliers in efforts to upgrade these seals were unsuccessful. Another suitable supplier had therefore to be found, and a 'new,' COG-owned seal developed; this was completed in 1997. This paper summarizes its testing, along with that of the two existing products. Resistance to aging has been improved significantly. Testing has shown that an accident can be safely withstood after 10 years of service or 40,000 openings-closings, whichever comes first. AECL's Fluid Sealing Technology Unit (FSTU) has invested in the special moulds, test fixtures and other necessary tooling and documentation required to begin commercial manufacture of this new quality product. Accordingly, as with FSTU's other nuclear products such as pump seals, the long-term supply of door seals to CANDU plants is now protected from many external uncertainties-e.g., commercial products being discontinued, materials being changed, companies going out of business. Manufacturing to AECL's detailed specifications is being subcontracted to the new supplier. FSTU is performing the quality surveillance, inspection, testing, and customer service activities concomitant with direct responsibility for supply to the plants. (author)

  11. Instrumentation and control upgrade evaluation methodology. Volume 1: Manual. Final report

    International Nuclear Information System (INIS)

    Bliss, M.; Brown, E.; Florio, F.; Stofko, M.

    1996-07-01

    This methodology manual describes how to develop an Upgrade Evaluation Report (UER) for an I and C system that has been identified as an upgrade candidate in the I and C Life Cycle Management Plan (LCMP). A UER can be developed by a nuclear power plant to determine the cost-effectiveness and feasibility of upgrading an aging or obsolete Instrumentation and Control (I and C) System. A separate UER is developed for each upgrade candidate system. A UER will determine if a given system requires an upgrade or if it is more cost-effective to maintain the present system. If an upgrade is unnecessary, the system will be reclassified as a retained system and a system maintenance plan will be developed for it. This manual is accompanied by a workbook (EPRI TR-104963-V2) which contains various worksheets, outlines, and generic interview questions that aid in the UER development process

  12. Beyond centrality-classifying topological significance using backup efficiency and alternative paths

    International Nuclear Information System (INIS)

    Shavitt, Yuval; Singer, Yaron

    2007-01-01

    In complex networks characterized by broad degree distribution, node significance is often associated with its degree or with centrality metrics which relate to its reachability and shortest paths passing through it. Such measures do not consider availability of efficient backup of the node and thus often fail to capture its contribution to the functionality and resilience of the network operation. In this paper, we suggest the quality of backup (QoB) and alternative path centrality (APC) measures as complementary methods which enable analysis of node significance in a manner which considers backup. We examine the theoretical significance of these measures and use them to classify nodes in social interaction networks and in the Internet AS (autonomous system) graph while applying the valley-free routing restrictions which reflect the economic relationships between the AS nodes in the Internet. We show that both node degree and node centrality are not necessarily evidence of its significance. In particular, we show that social structures do not necessarily depend on highly central nodes and that medium degree nodes with medium centrality measure prove to be crucial for efficient routing in the Internet AS graph

  13. Design and analysis of a lightweight prestressed antenna back-up structure

    Science.gov (United States)

    Ma, Zengxiang; Yang, Dehua; Cheng, Jingquan

    2010-07-01

    The planned Square Kilometer Array (SKA) includes three thousand 15m antennas. The radio flux density from the sun is stronger, so that a solar array, such as Frequency-Agile Solar Radiotelescope (FASR) with hundreds of dishes can have smaller dish size. Therefore, light weight, low cost dish design is of vital importance. The reflecting surface supported by an antenna back-up structure, generally, should have an RMS surface error less than λ/20 (λ. is the operating wavelength). For resisting gravitational, wind, and ice-snow loadings, an antenna dish also requires reasonable mode frequencies. In this paper, different low cost small or medium back-up structure designs are discussed, including double-layer truss design and prestressed dish design. Based on discussion, an innovative light weight, prestressed back-up structure is proposed for small or medium aperture antennas. Example of a small 4.5m aperture dish design working below 3GHz is presented. This design is a one-layer prestressed truss structure with low weight, ease installation, and low manufacture cost. Structural analysis and modal extraction results show the structure is much stiffer than the same structure without prestressed loading.

  14. Power backup Density based Clustering Algorithm for Maximizing Lifetime of Wireless Sensor Networks

    DEFF Research Database (Denmark)

    Wagh, Sanjeev; Prasad, Ramjee

    2014-01-01

    WSNs consists several nodes spread over experimental fields for specific application temporarily. The spatially distributed sensor nodes sense and gather the information for intended parameters like temperature, sound, vibrations, etc for the particular application. In this paper, we evaluate the...

  15. Straflo upgrade for Laufenburg

    Energy Technology Data Exchange (ETDEWEB)

    Ruoss, R.; Gyenge, J.; Fischer, F.

    1988-03-01

    Built in the early years of this century to generate power from the headwaters of the river Rhine, the Laufenburg power station is undergoing modernization. Previous upratings have brought its net output from 40MW to 81MW. The present plant utilizes 10 Straflo turbines in place of Francis machines and the planned maximum output is 106MW. The turbines are described in some detail in this paper, together with associated modifications to the plant.

  16. The Advanced Light Source Upgrade

    International Nuclear Information System (INIS)

    Chemla, Daniel S.; Feinberg, Benjamin; Hussain, Zahid; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

    2003-01-01

    The ALS, a third-generation synchrotron light source at Berkeley Lab, has been operating for almost a decade and is generating forefront science by exploiting the high brightness of a third-generation source in three areas: (1) high resolving power for spectroscopy; (2) high spatial resolution for microscopy and spectromicroscopy; and (3) high coherence for experiments such as speckle. However, the ALS was one of the first third-generation machines to be designed, and accelerator and insertion-device technology have significantly changed since its conception. As a result, its performance will inevitably be outstripped by newer, more advanced sources. To remain competitive and then set a new standard, the performance of the ALS, in particular its brightness, must be enhanced. Substantial improvements in brightness and current have always been feasible in principle, but they incur the penalty of a much reduced lifetime, which is totally unacceptable to our users. Significant brightness improvements can be realized in the core soft x-ray region by going to top-off operation, where injection would be quasi-continuous and the lifetime objections disappear. In top-off mode with higher average current, a reduced vertical emittance and beta function, and small-gap permanent-magnet or superconducting insertion devices, one to two orders of magnitude improvement in brightness can be had in the soft x-ray range. These improvements also extend the high energy range of the undulator radiation beyond the current limit of 2000 eV. Descriptions of the upgrade and the important new science achievable are presented

  17. Major upgrades of the high frequency B-dot probe diagnostic suite on ASDEX Upgrade

    Directory of Open Access Journals (Sweden)

    Ochoukov Roman

    2017-01-01

    Full Text Available The high frequency B-dot (HFB probe diagnostic on the ASDEX Upgrade tokamak has undergone a considerable upgrade during the 2016 opening of the torus. The probe coverage is now greatly expanded toroidally, as well as radially with the addition of probes on the high field side and the removable manipulator head. A new 2-channel fast digitizer now allows to examine and record radio frequency (RF wave emissions emanating from the plasma in the ion cyclotron range of frequencies (ICRF. Possible studies that can be achieved now include: a study of core ICRF power absorption efficiency; a study of ion cyclotron emissions from the plasma generated by energetic ions; and study of ICRF wave/plasma turbulence interactions in the scrape-off layer region.

  18. New window design options for CEBAF energy upgrade

    International Nuclear Information System (INIS)

    Phillips, L.; Mammosser, J.; Nguyen, V.

    1997-01-01

    As the Jefferson Laboratory upgrades the existing CEBAF electron accelerator to operate at higher energies, the fundamental power coupler windows will be required to operate with lower RF dissipation and increased immunity to radiation from cavity field emission. New designs and modifications to existing designs which can achieve these goals are described

  19. Upgrades and Real Time Ntm Control Application of the Ece Radiometer on Asdex Upgrade

    Science.gov (United States)

    Hicks, N. K.; Suttrop, W.; Behler, K.; Giannone, L.; Manini, A.; Maraschek, M.; Raupp, G.; Reich, M.; Sips, A. C. C.; Stober, J.; Treutterer, W.; ASDEX Upgrade Team; Cirant, S.

    2009-04-01

    The 60-channel electron cyclotron emission (ECE) radiometer diagnostic on the ASDEX Upgrade tokamak is presently being upgraded to include a 1 MHz sampling rate data acquisition system. This expanded capability allows electron temperature measurements up to 500 kHz (anti-aliasing filter cut-off) with spatial resolution ~1 cm, and will thus provide measurement of plasma phenomena on the MHD timescale, such as neoclassical tearing modes (NTMs). The upgraded and existing systems may be run in parallel for comparison, and some of the first plasma measurements using the two systems together are presented. A particular planned application of the upgraded radiometer is integration into a real-time NTM stabilization loop using targeted deposition of electron cyclotron resonance heating (ECRH). For this loop, it is necessary to determine the locations of the NTM and ECRH deposition using ECE measurements. As the magnetic island of the NTM repeatedly rotates through the ECE line of sight, electron temperature fluctuations at the NTM frequency are observed. The magnetic perturbation caused by the NTM is independently measured using Mirnov coils, and a correlation profile between these magnetic measurements and the ECE data is constructed. The phase difference between ECE oscillations on opposite sides of the island manifests as a zero-crossing of the correlation profile, which determines the NTM location in ECE channel space. To determine the location of ECRH power deposition, the power from a given gyrotron may be modulated at a particular frequency. Correlation analysis of this modulated signal and the ECE data identifies a particular ECE channel associated with the deposition of that gyrotron. Real time equilibrium reconstruction allows the ECE channels to be translated into flux surface and spatial coordinates for use in the feedback loop.

  20. Upgrade of ICRF heating system on EAST

    International Nuclear Information System (INIS)

    Chen Gen; Zhao Yanpin; Mao Yuzhou

    2013-01-01

    ICRF (Ion Cyclotron Range of Frequency) heating is an essential heating and current drive tool on EAST (Experimental Advanced Superconducting Tokamak). The high-power steady-state transmitters were designed as a part of research and development of ICRF heating system which aimed at output power of 1.5 MW for 1000 s in a frequency range of 25 to 70 MHz. There are 3 stage power amplifiers for each transmitter. Tube TH525A and TH535 were chosen for drive power amplifier (DPA) and final power amplifier (FPA), respectively. The power supply system of DPA and FPA were upgraded by using reliable PSM high voltage sources, whose response time is less than 5 μs. The ICRF system, which consists of 8 transmitters, will give out more than 10 MW total output power in the future. Four of them have been already fabricated, and another four are under construction. Three liquid stub tuners are used for impedance matching between antennas and transmitters, which can be only tuned shot to shot. There are two fast wave heating antennas which are assembled at I port and B port on EAST. Several projects are in progress including fast response impedance matching, distributed data acquisition and control system and so on for EAST ICRF heating system. (author)

  1. Project scenarios for bitumen upgrading

    International Nuclear Information System (INIS)

    Koppel, P.E.; Mazurek, W.L.; Harji, A.

    2002-01-01

    The established reserves of Alberta's heavy oil resources are 178 billion barrels, and potential recoverable reserves are 315 billion barrels. The challenge of production includes the logistics of recovery, upgrading and transportation to market. Utilization of the bitumen is not simple because bitumen is too viscous to transport by pipeline. In addition, it is not processable by most existing refineries unless it can be upgraded through dilution. This paper examined different factors regarding the economic viability of various upgrading methods of a wide range of bitumen feedstocks. The study also examined the sensitivity of refinery demand to the prices of these feedstocks, along with the competitiveness among bitumen-based feedstock and conventional crudes. Western Canada, Ontario and the PADD II district in the United States are the 3 major markets for western Canadian bitumen based feedstock, the demand for which depends on refinery configurations and asphalt demand. This paper described the following 4 generic scenarios that describe Alberta bitumen upgrading projects: (1) adjacent to open pit mines, (2) adjacent to steam assisted gravity drainage (SAGD) facilities, (3) remotely located from resource production at an existing refinery, and (4) pipeline bitumen. It was noted that producers should determine the best way to upgrade the bitumen to ensure there is an economic market for the product, but they should also be aware not to over process the bitumen so as not to leave existing refinery facilities under-utilized. 2 refs., 1 tab., 3 figs

  2. Processing options for bitumen upgrading

    International Nuclear Information System (INIS)

    Harji, A.N.; Koppel, P.E.; Mazurek, W.L.; Meysami, P.

    2003-01-01

    It is estimated that 178 billion barrels of oil can be recovered from Alberta's vast heavy oil reserves. The challenge lies in the logistics of recovering, upgrading and transporting the oil to market. The Canadian Energy Research Institute conducted a recent study to determine market potential by 2007 for diluted bitumen and synthetic crude oil produced from upgraded bitumen. The viability for a wide range of bitumen feedstocks was assessed along with the sensitivity of refinery demand to their prices. The 3 major markets for western Canadian bitumen include PADD 2 in the United States, western Canada, and Ontario. Bitumen is too viscous to transport by pipeline and cannot be processed by most of the existing refineries. Therefore, in order to develop a mass market for the product, bitumen must undergo the energy intensive upgrading process at existing refineries. The factors impacting which method of upgrading is most suitable were discussed with particular attention to the impact that Canada's ratification of the Kyoto Protocol may have on Alberta's bitumen resource in terms of costs of complying with greenhouse gas reduction initiatives. The authors emphasized that it is crucial to customize an upgrading project to meet site and market specific factors. 8 refs., 3 tabs., 3 figs

  3. Upgrading of the research reactors FRG-1 and FRG-2

    International Nuclear Information System (INIS)

    Krull, W.

    1981-01-01

    In 1972 for the research reactor FRG-2 we applied for a license to increase the power from 15 MW to 21 MW. During this procedure a public laying out of the safety report and an upgrading procedure for both research reactors - FRG-1 (5 MW) and FRG-2 - were required by the licensing authorities. After discussing the legal background for licensing procedures in the Federal Republic of Germany the upgrading for both research reactors is described. The present status and future licensing aspects for changes of our research reactors are discussed, too. (orig.) [de

  4. NPP Temelin instrumentation and control system upgrade and verification

    International Nuclear Information System (INIS)

    Ubra, O.; Petrlik, J.

    1998-01-01

    Two units of Ver 1000 type of the Czech nuclear power plant Temelin, which are under construction are being upgraded with the latest instrumentation and control system delivered by WEC. To confirm that the functional design of the new Reactor Control and Limitation System, Turbine Control System and Plant Control System are in compliance with the Czech customer requirements and that these requirements are compatible with NPP Temelin upgraded technology, the verification of the control systems has been performed. The method of transient analysis has been applied. Some details of the NPP Temelin Reactor Control and Limitation System verification are presented.(author)

  5. Upgrading and Fixing Computers Do-it-Yourself for Dummies

    CERN Document Server

    Rathbone, Andy

    2010-01-01

    An illustrated, step-by-step guide to repairs and upgrades. Whether you want to prepare your computer for Windows 7, avoid investing in a new one, or just "go green", this fully illustrated guide has what you need. You'll learn how to add printers and new keyboards, boost your PC's performance and increase memory, improve power consumption, rev up your multimedia capacity, and much more. Step-by-step instructions are accompanied by photos that show you exactly what you should see at every stage.: Learn to perform basic upgrades and prepare your PC for high-speed Internet connections,

  6. Alaska Seismic Network Upgrade and Expansion

    Science.gov (United States)

    Sandru, J. M.; Hansen, R. A.; Estes, S. A.; Fowler, M.

    2009-12-01

    AEIC (Alaska Earthquake Information Center) has begun the task of upgrading the older regional seismic monitoring sites that have been in place for a number of years. Many of the original sites (some dating to the 1960's) are still single component analog technology. This was a very reasonable and ultra low power reliable system for its day. However with the advanced needs of today's research community, AEIC has begun upgrading to Broadband and Strong Motion Seismometers, 24 bit digitizers and high-speed two-way communications, while still trying to maintain the utmost reliability and maintaining low power consumption. Many sites have been upgraded or will be upgraded from single component to triaxial broad bands and triaxial accerometers. This provided much greater dynamic range over the older antiquated technology. The challenge is compounded by rapidly changing digital technology. Digitizersand data communications based on analog phone lines utilizing 9600 baud modems and RS232 are becoming increasingly difficult to maintain and increasingly expensive compared to current methods that use Ethernet, TCP/IP and UDP connections. Gaining a reliable Internet connection can be as easy as calling up an ISP and having a DSL connection installed or may require installing our own satellite uplink, where other options don't exist. LANs are accomplished with a variety of communications devices such as spread spectrum 900 MHz radios or VHF radios for long troublesome shots. WANs are accomplished with a much wider variety of equipment. Traditional analog phone lines are being used in some instances, however 56K lines are much more desirable. Cellular data links have become a convenient option in semiurban environments where digital cellular coverage is available. Alaska is slightly behind the curve on cellular technology due to its low population density and vast unpopulated areas but has emerged into this new technology in the last few years. Partnerships with organizations

  7. Injector upgrade for the S-DALINAC

    Energy Technology Data Exchange (ETDEWEB)

    Kuerzeder, Thorsten; Brunken, Marco; Conrad, Jens; Eichhorn, Ralf; Graef, Hans-Dieter; Richter, Achim; Sievers, Sven [Institut fuer Kernphysik, TU Darmstadt (Germany); Ackermann, Wolfgang; Mueller, Wolfgang F.O.; Steiner, Bastian; Weiland, Thomas [Institut fuer Theorie Elektromagnetischer Felder, TU Darmstadt (Germany); Fuerst, Joel [Argonne National Laboratory, Argonne (United States)

    2009-07-01

    The injector section of the S-DALINAC currently delivers beams of up to 10 MeV w ith a current of up to 60{mu}A. The upgrade aims to increase both parameters to 14 MeV and 150{mu}A in order to allow more demanding experiments. Therefor e, a modified cryostat module equipped with two new cavities is required. Due to an increase in rf power to 2 kW the old coaxial rf input couplers, being design ed for a maximum power of 500 W, have to be replaced by new waveguide couplers. We review the design principles and report on the fabrication of the cavities an d the whole module.

  8. The D0 detector upgrade

    International Nuclear Information System (INIS)

    Bross, A.D.

    1995-02-01

    The Fermilab collider program is undergoing a major upgrade of both the accelerator complex and the two detectors. Operation of the Tevatron at luminosities upwards of ten time that currently provided will occur in early 1999 after the commissioning of the new Fermilab Main Injector. The D0 upgrade program has been established to deliver a detector that will meet the challenges of this environment. A new magnetic tracker consisting of a superconducting solenoid, a silicon vertex detector, a scintillating fiber central tracker, and a central preshower detector will replace the current central tracking and transition radiation chambers. We present the design and performance capabilities of these new systems and describe results from physics simulations that demonstrate the physics reach of the upgraded detector

  9. Environmental upgrading of a landfill

    International Nuclear Information System (INIS)

    Agostinetto, V.; Vendrame, G.

    1999-01-01

    This article refers to an experimental study concerning the vegetative upgrading of a closed-down landfill (once used for industrial waste disposal). The aim was to check the possibility of reconstructing or aiding the natural growth of a vegetation in keeping with the surrounding area, in a tried environment such as that of landfills. The original idea contained in the approved project - which meant to generically upgrade the territory by planting species belonging to the grassy layer, shrubs and trees - has, with time, undergone some changes. On the basis of both the knowledge acquired during management and of a more accurate analysis of the territory, the experiment was preferred to aim at finding out which were the species, both continental and Mediterranean, able to gradually adjust to the surrounding landscape, leaving to natural selection the task to decide which species were more suitable to the upgrading of closed-down landfills, and which planting technique was more effective [it

  10. Hydrogen assisted biological biogas upgrading

    DEFF Research Database (Denmark)

    Bassani, Ilaria

    Wind and biomass are promoted worldwide as sustainable forms of energy. Anaerobic digestion of biomass produces biogas with ∼50−70% CH4 and 30−50% CO2. However, biogas with >90% CH4 content has higher heating value, can be injected into the natural gas grid or used as alternative to natural gas...... as vehicle fuel. Methods currently available for biogas upgrading mainly consists of physicochemical CO2 removal, requiring the use of chemical substances and energy input and, thus, increasing process costs. This PhD project proposes an alternative to existing biogas upgrading technologies, where H2......, produced by water electrolysis, using excess of electricity from wind mills, is coupled with the CO2 contained in the biogas to convert them to CH4. This process is defined as biological biogas upgrading and is carried out by hydrogenotrophic methanogenic archaea that couples CO2 with H2 to produce...

  11. Status of TMX upgrade diagnostics construction

    International Nuclear Information System (INIS)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-01-01

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan

  12. A Neutral Beam Injector Upgrade for NSTX

    International Nuclear Information System (INIS)

    Stevenson, T.; McCormack, B.; Loesser, G.D.; Kalish, M.; Ramakrishnan, S.; Grisham, L.; Edwards, J.; Cropper, M.; Rossi, G.; Halle, A. von; Williams, M.

    2002-01-01

    The National Spherical Torus Experiment (NSTX) capability with a Neutral Beam Injector (NBI) capable of 80 kiloelectronvolt (keV), 5 Megawatt (MW), 5 second operation. This 5.95 million dollar upgrade reused a previous generation injector and equipment for technical, cost, and schedule reasons to obtain these specifications while retaining a legacy capability of 120 keV neutral particle beam delivery for shorter pulse lengths for possible future NSTX experiments. Concerns with NBI injection included power deposition in the plasma, aiming angles from the fixed NBI fan array, density profiles and beam shine through, orbit losses of beam particles, and protection of the vacuum vessel wall against beam impingement. The upgrade made use of the beamline and cryo panels from the Neutral Beam Test Stand facility, existing power supplies and controls, beamline components and equipment not contaminated by tritium during DT [deuterium-tritium] experiments, and a liquid Helium refrigerator plant to power and cryogenically pump a beamline and three ion sources. All of the Tokamak Fusion Test Reactor (TFTR) ion sources had been contaminated with tritium, so a refurbishment effort was undertaken on selected TFTR sources to rid the three sources destined for the NSTX NBI of as much tritium as possible. An interconnecting duct was fabricated using some spare and some new components to attach the beamline to the NSTX vacuum vessel. Internal vacuum vessel armor using carbon tiles was added to protect the stainless steel vacuum vessel from beam impingement in the absence of plasma and interlock failure. To date, the NBI has operated to 80 keV and 5 MW and has injected requested power levels into NSTX plasmas with good initial results, including high beta and strong heating characteristics at full rated plasma current

  13. High voltage multiplexing for the ATLAS Tracker Upgrade

    International Nuclear Information System (INIS)

    Villani, E G; Phillips, P; Matheson, J; Lynn, D; Hommels, L B A; Gregor, I; Bessner, M; Tackmann, K; Newcomer, F M; Spencer, E; Greenall, A

    2014-01-01

    The increased luminosity of the HL-LHC will require more channels in the upgraded ATLAS Tracker, as a result of the finer detector segmentation, stemming from the otherwise too high occupancy. Among the many technological challenges facing the ATLAS Tracker Upgrade there is more an efficient power distribution and HV biasing of the sensors. The solution adopted in the current ATLAS detector uses one HV conductor for each sensor, which makes it easy to disable malfunctioning sensors without affecting the others, but space constraints and material budget considerations renders this approach impractical for the Upgraded detector. A number of approaches, including the use of the same HV line to bias several sensors and suitable HV switches, along with their control circuitry, are currently being investigated for this purpose. The proposed solutions along with latest test results and measurements will be described

  14. Status of the CMS Phase I pixel detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Spannagel, S., E-mail: simon.spannagel@desy.de

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  15. Status of the CMS Phase I Pixel Detector Upgrade

    CERN Document Server

    Spannagel, Simon

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase~I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  16. Upgrade of reactor operation technology

    International Nuclear Information System (INIS)

    Itoh, Hideaki; Suzuki, Toshiaki; O-kawa, Toshikatsu

    2003-01-01

    To improve operational reliability and availability, the operation technology for a fast reactor was developed in the ''JOYO''. This report describes the upgrading of the simulator, plant operation management tools and fuel handling system for the MK-III core operation. The simulator was modified to the MK-III version to verify operation manuals, and to train operators in MK-III operation. The plant operation management tool was replaced on the operation experience to increase the reliability and efficiency of plant management works relating to plant operation and maintenance. To shorten the refueling period, the fuel handling system was upgraded to full automatic remote control. (author)

  17. Argonne's atlas control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.; Quock, D.; Chapin, B.; Figueroa, J.

    1999-01-01

    The ATLAS facility (Argonne Tandem-Linac Accelerator System) is located at the Argonne National Laboratory. The facility is a tool used in nuclear and atomic physics research, which focuses primarily on heavy-ion physics. The accelerator as well as its control system are evolutionary in nature, and consequently, continue to advance. In 1998 the most recent project to upgrade the ATLAS control system was completed. This paper briefly reviews the upgrade, and summarizes the configuration and features of the resulting control system

  18. EN-CV during LS1: upgrade, consolidation, maintenance, operation

    International Nuclear Information System (INIS)

    Nonis, M.

    2012-01-01

    The Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved in several projects and activities during the long shutdown in 2013 and 2014 (LS1) within a time-frame limited to around twelve months. According to the requests received so far, most projects are related to the upgrade of users' equipment, consolidation work, and the construction of new plants. However, through the experience gained from the first years of the LHC run, some projects are also needed to adapt the existing installations to the new operating parameters. Some of these projects are presented hereafter, outlining the impact that they will have on operational working conditions or risks of breakdown. Among these projects we find: the PM32 raising pumps, the cooling of the CERN Control Center, R2E, the backup cooling towers for ATLAS and cryogenics, a thermosyphon for ATLAS, or new pumps in UWs. Finally, EN-CV activities during LS1 for maintenance, operation, and commissioning will be mentioned since they represent a major workload for the Group

  19. A kernel plus method for quantifying wind turbine performance upgrades

    KAUST Repository

    Lee, Giwhyun

    2014-04-21

    Power curves are commonly estimated using the binning method recommended by the International Electrotechnical Commission, which primarily incorporates wind speed information. When such power curves are used to quantify a turbine\\'s upgrade, the results may not be accurate because many other environmental factors in addition to wind speed, such as temperature, air pressure, turbulence intensity, wind shear and humidity, all potentially affect the turbine\\'s power output. Wind industry practitioners are aware of the need to filter out effects from environmental conditions. Toward that objective, we developed a kernel plus method that allows incorporation of multivariate environmental factors in a power curve model, thereby controlling the effects from environmental factors while comparing power outputs. We demonstrate that the kernel plus method can serve as a useful tool for quantifying a turbine\\'s upgrade because it is sensitive to small and moderate changes caused by certain turbine upgrades. Although we demonstrate the utility of the kernel plus method in this specific application, the resulting method is a general, multivariate model that can connect other physical factors, as long as their measurements are available, with a turbine\\'s power output, which may allow us to explore new physical properties associated with wind turbine performance. © 2014 John Wiley & Sons, Ltd.

  20. Hardware in the loop simulation test platform of fuel cell backup system

    Directory of Open Access Journals (Sweden)

    Ma Tiancai

    2015-01-01

    Full Text Available Based on an analysis of voltage mechanistic model, a real-time simulation model of the proton exchange membrane (PEM fuel cell backup system is developed, and verified by the measurable experiment data. The method of online parameters identification for the model is also improved. Based on the software LabVIEW/VeriStand real-time environment and the PXI Express hardware system, the PEM fuel cell system controller hardware in the loop (HIL simulation plat-form is established. Controller simulation test results showed the accuracy of HIL simulation platform.

  1. The use of different analytical techniques as a backup to mineral resources assessment

    International Nuclear Information System (INIS)

    Carvalho Tofani, P. de; Ferreira, M.P.; Gomes, H.; Avelar, M.M.

    1982-01-01

    The Empresas Nucleares Brasileiras S.A. (NUCLEBRAS) has implemented and improved, since their foundation in 1974, several laboratories at the Centro de Desenvolvimento da Tecnologia Nuclear (CDTN), in Belo Horizonte (MG, Brazil), in order to develop capabilities in the analytical chemistry field. Skillful personnel, using a large spectrum of equipment and procedures, is already able to determine, fast and accurately, almost any chemical element in any matrix. About 340.000 analytical determinations have been performed during the last seven years, concerning mostly chemical elements of great importance in the mineral technology programs. This considerable amount of results has been used, specially, as a backup to assess Brazilian uranium resources. (Author) [pt

  2. Study of Info backup system of strategy management for coal enterprises

    Energy Technology Data Exchange (ETDEWEB)

    Han, K.; Dai, B.; Li, Q.; Shao, J. [China University of Mining and Technology, Xuzhou (China). College of Mineral and Energy Resources

    2001-09-01

    It is an application system which helps the determination, enforcement and control of the development strategy of a coal enterprise. This system, which is based on Delphi 5.0, is a Windows application and is bundled with some excellent software, such as 3D Studio Max, Autocad, PhotoShop, Gif Gear etc. It comprises of two subsystems, i.e., the information backup subsystem of strategy management and the control subsystem of strategy enforcement. This system can provide not only the effective information to the leaders or the managers, but also the timely and effective control in the whole course of strategy enforcement. 5 refs.,1 fig.

  3. Backup key generation model for one-time password security protocol

    Science.gov (United States)

    Jeyanthi, N.; Kundu, Sourav

    2017-11-01

    The use of one-time password (OTP) has ushered new life into the existing authentication protocols used by the software industry. It introduced a second layer of security to the traditional username-password authentication, thus coining the term, two-factor authentication. One of the drawbacks of this protocol is the unreliability of the hardware token at the time of authentication. This paper proposes a simple backup key model that can be associated with the real world applications’user database, which would allow a user to circumvent the second authentication stage, in the event of unavailability of the hardware token.

  4. Utilizing data grid architecture for the backup and recovery of clinical image data.

    Science.gov (United States)

    Liu, Brent J; Zhou, M Z; Documet, J

    2005-01-01

    Grid Computing represents the latest and most exciting technology to evolve from the familiar realm of parallel, peer-to-peer and client-server models. However, there has been limited investigation into the impact of this emerging technology in medical imaging and informatics. In particular, PACS technology, an established clinical image repository system, while having matured significantly during the past ten years, still remains weak in the area of clinical image data backup. Current solutions are expensive or time consuming and the technology is far from foolproof. Many large-scale PACS archive systems still encounter downtime for hours or days, which has the critical effect of crippling daily clinical operations. In this paper, a review of current backup solutions will be presented along with a brief introduction to grid technology. Finally, research and development utilizing the grid architecture for the recovery of clinical image data, in particular, PACS image data, will be presented. The focus of this paper is centered on applying a grid computing architecture to a DICOM environment since DICOM has become the standard for clinical image data and PACS utilizes this standard. A federation of PACS can be created allowing a failed PACS archive to recover its image data from others in the federation in a seamless fashion. The design reflects the five-layer architecture of grid computing: Fabric, Resource, Connectivity, Collective, and Application Layers. The testbed Data Grid is composed of one research laboratory and two clinical sites. The Globus 3.0 Toolkit (Co-developed by the Argonne National Laboratory and Information Sciences Institute, USC) for developing the core and user level middleware is utilized to achieve grid connectivity. The successful implementation and evaluation of utilizing data grid architecture for clinical PACS data backup and recovery will provide an understanding of the methodology for using Data Grid in clinical image data backup for

  5. Supply of clean water to the bearings and mechanical seals of the backup pumps

    International Nuclear Information System (INIS)

    Jolas, C.

    1997-01-01

    The purpose of the backup pumps is to cool the primary circuit and pressurised water reactor containment in the case of a primary cooler loss accident. The water taken in by these pumps in the case of accident is loaded with solid particles. In order to ensure correct operation of the bearings and mechanical seals of these machines, they must be supplied with clean water. In other words, the solid particles must be removed from the water intake. Manufacturers generally use cyclonic separators to achieve this. (author)

  6. Old PCs: Upgrade or Abandon?

    Science.gov (United States)

    Perez, Ernest

    1997-01-01

    Examines the practical realities of upgrading Intel personal computers in libraries, considering budgets and technical personnel availability. Highlights include adding RAM; putting in faster processor chips, including clock multipliers; new hard disks; CD-ROM speed; motherboards and interface cards; cost limits and economic factors; and…

  7. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Amdor, C.; Angioni, C.; Balden, M.; Bardin, S.; L. Barrera Orte,; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Birkenmeier, G.; Bobkov, V.; Boom, J.; Bottereau, C.; Bottino, A.; Braun, F.; Brezinsek, S.; Brochard, T.; M. Brüdgam,; Buhler, A.; Burckhart, A.; Casson, F. J.; Chankin, A.; Chapman, I.; Clairet, F.; Classen, I.G.J.; Coenen, J. W.; Conway, G. D.; Coster, D. P.; Curran, D.; da Silva, F.; P. de Marné,; D' Inca, R.; Douai, D.; Drube, R.; Dunne, M.; Dux, R.; Eich, T.; Eixenberger, H.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fischer, R.; H. Fünfgelder,; Fuchs, J. C.; K. Gál,; M. García Muñoz,; Geiger, B.; Giannone, L.; T. Görler,; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Guimarais, L.; S. Günter,; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; T. Härtl,; Hauff, T.; Heinemann, B.; Herrmann, A.; Hobirk, J.; H. Höhnle,; M. Hölzl,; Hopf, C.; Houben, A.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kantor, M.; C.-P. Käsemann,; Kallenbach, A.; S. Kálvin,; Kantor, M.; Kappatou, A.; Kardaun, O.; Kasparek, W.; Kaufmann, M.; Kirk, A.; H.-J. Klingshirn,; Kocan, M.; Kocsis, G.; Konz, C.; Koslowski, R.; Krieger, K.; Kubic, M.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Lazaros, A.; Leipold, F.; Leuterer, F.; Lindig, S.; Lisgo, S.; Lohs, A.; Lunt, T.; Maier, H.; Makkonen, T.; Mank, K.; M.-E. Manso,; Maraschek, M.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Mehlmann, F.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Müller, S.; H.W. Müller,; M. Münich,; Neu, G.; Neu, R.; Neuwirth, D.; Nocente, M.; Nold, B.; Noterdaeme, J. M.; Pautasso, G.; Pereverzev, G.; B. Plöckl,; Podoba, Y.; Pompon, F.; Poli, E.; Polozhiy, K.; Potzel, S.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reimold, F.; Ribeiro, T.; Riedl, R.; Rohde, V.; van Rooij, G. J.; Roth, J.; Rott, M.; Ryter, F.; Salewski, M.; Santos, J.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schrittwieser, R.; Schubert, M.; Schweinzer, J.; Scott, B.; Sempf, M.; Sertoli, M.; Siccinio, M.; Sieglin, B.; Sigalov, A.; Silva, A.; Sommer, F.; A. Stäbler,; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Tala, T.; Tardini, G.; Teschke, M.; Tichmann, C.; Told, D.; Treutterer, W.; Tsalas, M.; VanZeeland, M. A.; Varela, P.; Veres, G.; Vicente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Viola, B.; Vorpahl, C.; Wachowski, M.; Wagner, D.; Wauters, T.; Weller, A.; Wenninger, R.; Wieland, B.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; E. Würsching,; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron

  8. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Kallenbach, A.; Adamek, J.; Aho-Mantila, L.

    2011-01-01

    The ASDEX Upgrade programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. After the finalization of the tungsten coating of the plasma facing components, the re-availa...

  9. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron r...

  10. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Kallenbach, A.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Angioni, C.; Atanasiu, C. V.; Balden, M.; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Bobkov, V.; Boom, J.; Bottino, A.; Braun, F.; Brudgam, M.; Buhler, A.; Burckhart, A.; Chankin, A.; Classen, I.G.J.; Conway, G. D.; Coster, D. P.; de Marne, P.; D' Inca, R.; Drube, R.; Dux, R.; Eich, T.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fahrbach, H. U.; Fattorini, L.; Fischer, R.; Flaws, A.; Funfgelder, H.; Fuchs, J. C.; Gal, K.; Munoz, M. G.; Geiger, B.; Adamov, M. G.; Giannone, L.; Giroud, C.; Gorler, T.; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Gunter, S.; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; Hauff, T.; Heinemann, B.; Herrmann, A.; Hicks, N.; Hobirk, J.; Hohnle, H.; Holzl, M.; Hopf, C.; Horton, L.; Huart, M.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kasemann, C. P.; Kalvin, S.; Kardaun, O.; Kaufmann, M.; Kirk, A.; Klingshirn, H. J.; Kocan, M.; Kocsis, G.; Kollotzek, H.; Konz, C.; Koslowski, R.; Krieger, K.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Leipold, F.; Leuterer, F.; Lohs, A.; N C Luhmann Jr.,; Lunt, T.; Lyssoivan, A.; Maier, H.; Maggi, C.; Mank, K.; Manso, M. E.; Maraschek, M.; Martin, P.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Muller, H. W.; Munich, M.; Murmann, H.; Neu, G.; Neu, R.; Nold, B.; Noterdaeme, J. M.; Park, H. K.; Pautasso, G.; Pereverzev, G.; Podoba, Y.; Pompon, F.; Poli, E.; Polochiy, K.; Potzel, S.; Prechtl, M.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reiter, B.; Ribeiro, T.; Riedl, R.; Rohde, V.; Roth, J.; Rott, M.; Ryter, F.; Sandmann, W.; Santos, J.; Sassenberg, K.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schramm, G.; Schrittwieser, R.; Schweinzer, J.; Scott, B.; Sempf, M.; Serra, F.; Sertoli, M.; Siccinio, M.; Sigalov, A.; Silva, A.; Sips, A.C.C.; Sommer, F.; Stabler, A.; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Szepesi, T.; Tardini, G.; Tichmann, C.; Told, D.; Treutterer, W.; Urso, L.; Varela, P.; Vincente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Vorpahl, C.; Wagner, D.; Weller, A.; Wenninger, R.; Wieland, B.; Wigger, C.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; Wursching, E.; Yadikin, D.; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2011-01-01

    The ASDEX Upgrade programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. After the finalization of the tungsten coating of the plasma facing components, the

  11. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Zohm, H.; Adamek, J.; Angioni, C.

    2009-01-01

    ASDEX Upgrade was operated with a fully W-covered wall in 2007 and 2008. Stationary H-modes at the ITER target values and improved H-modes with H up to 1.2 were run without any boronization. The boundary conditions set by the full W wall (high enough ELM frequency, high enough central heating and...

  12. Upgrading of the Budapest reactor

    International Nuclear Information System (INIS)

    Rosta, L.

    1986-10-01

    The increasing importance of neutron sources, high demand for irradiation and experimental facilities as well as improved safety requirements in the 'eighties, necessitate not only a technical modernization of the Reactor but an overall upgrade including instrumentation. Such a reconstruction was decided by the Hungarian governement in 1983

  13. Upgrading of the West Area

    CERN Multimedia

    1983-01-01

    The rejigged main hall (EHW1) in the West Area: on background, below the crane, is the brown yoke of the Omega magnet which had been resited. The upgrading was completed by the time in July when 400 GeV protons arrived. See Annual Report 1983 p. 107.

  14. LHC challenges and upgrade options

    Energy Technology Data Exchange (ETDEWEB)

    Bruning, O [CERN AB/ABP, Y03600, 1211 Geneva 23 (Switzerland)], E-mail: Oliver.Bruning@cern.ch

    2008-05-15

    The presentation summarizes the key parameters of the LHC collider. Following a discussion of the main challenges for reaching the nominal machine performance the presentation identifies options for increasing the operation tolerances and the potential performance reach of the LHC by means of future hardware upgrades of the LHC and its injector complex.

  15. LHC challenges and upgrade options

    International Nuclear Information System (INIS)

    Bruning, O

    2008-01-01

    The presentation summarizes the key parameters of the LHC collider. Following a discussion of the main challenges for reaching the nominal machine performance the presentation identifies options for increasing the operation tolerances and the potential performance reach of the LHC by means of future hardware upgrades of the LHC and its injector complex

  16. Five-Megajoule Homopolar Upgrade

    Science.gov (United States)

    1981-06-01

    near the bearing lands to monitor temperature rise during motoring. AISI 4140 steel sleeves were shrunk onto the beryllium copper shaft of the new...MJ HPG in this upgrade. Rotor and Shaft A 0.75-m diameter, 0.28-m thick AISI 4340 air- craft quality steel rotor is shrunk on to a 0. 14-m diameter

  17. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Kallenbach, A.; Aguiam, D.; Aho-Mantila, L.

    2017-01-01

    The ASDEX Upgrade (AUG) programme is directed towards physics input to critical elements of the ITER design and the preparation of ITER operation, as well as addressing physics issues for a future DEMO design. Since 2015, AUG is equipped with a new pair of 3-strap ICRF antennas, which were design...

  18. VVER 1000-NPP Temelin safety upgrading

    International Nuclear Information System (INIS)

    Fleischhans, J.; Ubra, O.

    1995-01-01

    A modernisation program upgrading Temelin plant to meet internationally adopted standard has been implemented during plant design and construction phases. The initial Czech-Russian design (primary system was of Russian design, secondary system was of Czech design) has been extensively modified and adapted to present western safety criteria and operational requirements. The goals are to achieve a high level of safety, reliability, availability and load-following ability. The load-following ability and response to grid frequency changes are very important for the Czech Republic, since the nuclear capacity represents a high proportion of the overall electrical system there. On the basis of IAEA OSART missions and Halliburton NUS audit results and in compliance with recommendations of The State Office for Nuclear Safety, Czech Power Company and Czech scientists and researchers a modernisation program project for Temelin has been carried out. It includes three main groups of VVER1000 MW unit innovations: - Modernization and upgrading of the safety and control systems. - Fuel replacement and modification of the reactor core. - Innovation of some components of the primary and secondary systems. The tenders for instrumentation and control system, nuclear fuel, diagnostic system and radiation monitoring system were issued to the world-well known suppliers. The US company Westinghouse Electric >Corporation (WEC) was selected to submit contract for the delivery of instrumentation and control system primary side diagnostic system and for the delivery of nuclear fuel. The contract was signed in 1993

  19. Development of upgraded brown coal process

    Energy Technology Data Exchange (ETDEWEB)

    Komatsu, N.; Sugita, S.; Deguchi, T.; Shigehisa, T.; Makino, E. [Kobe Steel Ltd., Hyogo (Japan). Coal and Energy Project Department

    2004-07-01

    Half of the world's coal resources are so-called low rank coal (LRC) such as lignite, subbituminous coal. Utilization of such coal is limited due to low heat value and high propensity of spontaneous combustion. Since some of LRCs have advantages as clean coal, i.e. low ash and low sulfur content, LRC can be the excellent feedstock for power generation and metallurgy depending on the upgrading technology. The UBC (upgraded brown coal) process introduced here converts LRC to solid fuel with high heat value and less propensity of self-heating. Various world coals, such as Australian, Indonesian and USA LRC, were tested using the Autoclave and Bench Scale Unit, and the process application to LRC of wide range is proven. The R & D activities of the UBC process are introduced including a demonstration project with a 5 ton/day test plant in progress in Indonesia, expecting near future commercialisation in order to utilize abundant LRC of clean properties. 8 refs., 12 figs., 3 tabs.

  20. Vermont Yankee simulator BOP model upgrade

    International Nuclear Information System (INIS)

    Alejandro, R.; Udbinac, M.J.

    2006-01-01

    The Vermont Yankee simulator has undergone significant changes in the 20 years since the original order was placed. After the move from the original Unix to MS Windows environment, and upgrade to the latest version of SimPort, now called MASTER, the platform was set for an overhaul and replacement of major plant system models. Over a period of a few months, the VY simulator team, in partnership with WSC engineers, replaced outdated legacy models of the main steam, condenser, condensate, circulating water, feedwater and feedwater heaters, and main turbine and auxiliaries. The timing was ideal, as the plant was undergoing a power up-rate, so the opportunity was taken to replace the legacy models with industry-leading, true on-line object oriented graphical models. Due to the efficiency of design and ease of use of the MASTER tools, VY staff performed the majority of the modeling work themselves with great success, with only occasional assistance from WSC, in a relatively short time-period, despite having to maintain all of their 'regular' simulator maintenance responsibilities. This paper will provide a more detailed view of the VY simulator, including how it is used and how it has benefited from the enhancements and upgrades implemented during the project. (author)

  1. Power feeding to terminal devices in optical subscriber network; Hikari fuaiba tsushin ni okeru tanmatsu kiki eno kyuden

    Energy Technology Data Exchange (ETDEWEB)

    Yamasaki, M

    1998-09-01

    This paper outlines present state of the feeding system in the light access system in consideration of backup in case of home power failure. In the optical communication, equipment with bilateral conversion function for light and electricity has to be installed both on communication service side and home side. Outline of the light access system and equipment requiring backup are shown. The following items are explained: main types of the light access system, such as FTTC (fiber to the curb), FTTP (fiber to the pole), FTTH (fiber to the home) and HFC (hybrid fiber coax), and the feeding system; problems on feeding system for the light access system. Key elements of ONU (optical network unit) for FTTH and construction of the ONU power source are illustrated. The ONU power source is composed of a backup power supply unit and main body supply unit. Backup power is indispensable to the ONU and analog telephones: output is supplied by the backup batteries in power failure. For miniaturization of the backup power source, power supply circuits and backup batteries have to be miniaturized simultaneously. History of miniaturization is explained on the experimental models. 6 refs., 7 figs., 1 tab.

  2. Upgrading France's emergency plans

    International Nuclear Information System (INIS)

    Moures, Y.

    1991-01-01

    In France as elsewhere, the Chernobyl accident spurred a new stage in the development of nuclear safety. In the months following the accident, France's Minister of Industry launched a campaign to strengthen research and safety measures to: prevent reactor accidents; reinforce the concept of quality in operations; train staff, in areas such as crisis management; systematically review plans, installations and techniques related to crisis management; study accident containment procedures. There was also a systematic review of communication links with authorities and outside emergency organizations during the critical phase of an accident. On the operational level regulatory monitoring procedures were reorganized and reinforced. France has not opted for the permanent presence of on-site inspectors, but rather for the total, continuous responsibility of the power plant operator, with the safety authority intervening at frequent intervals. A major programme was also established to increase capabilities for investigation and intervention in a radioactive environment in nuclear installations. (author)

  3. Recent Upgrade of the Klystron Modulator at SLAC

    International Nuclear Information System (INIS)

    Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.

    2011-01-01

    The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 μS at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 μS at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

  4. Upgrading instrumentation and control systems for plant safety and operation

    International Nuclear Information System (INIS)

    Martin, M.; Prehler, H.J.; Schramm, W.

    1997-01-01

    Upgrading the electrical systems and instrumentation and control systems has become increasingly more important in the past few years for nuclear power plants currently in operation. As the requirements to be met in terms of plant safety and availability have become more stringent in the past few years, Western plants built in the sixties and seventies have been the subject of manifold backfitting and upgrading measures in the past. In the meantime, however, various nuclear power plants are facing much more thorough upgrading phases because of the difficulties in obtaining spare parts for older equipment systems. As digital technology has become widespread in many areas because of its advantages, and as applications are continuously expanding, conventional equipment and systems are losing more and more ground as a consequence of decreasing demand. Merely because of the pronounced decline in demand for conventional electronic components it is possible for equipment manufacturers to guarantee spare parts deliveries for older systems only for specific future periods of time. In addition, one-off manufacture entails high costs in purchases of spare parts. As a consequence of current thinking more and more focusing on availability and economy, upgrading of electrical systems and instrumentation and control systems is becoming a more and more topical question, for older plants even to ensure completion of full service life. (orig.) [de

  5. Production planning and backup sourcing strategy of a buyer-dominant supply chain with random yield and demand

    Science.gov (United States)

    Chen, Kebing; Xiao, Tiaojun

    2015-11-01

    This paper studies the backup sourcing strategy of the buyer and the production planning of the supplier in presence of both random yield and random demand. Since the production is susceptible to the randomness of yield beyond the control of the supplier, the buyer may access to a backup sourcing option for the finished items. We analyse the value of backup sourcing for both the decentralised and centralised channels. Backup sourcing strategy of the buyer may lower the supply chain's performance. We show that the order quantity of the buyer does not change the stocking factor of the supplier's input. Meanwhile, compared with the centralised operation, the decentralised operation is more dependent on the backup sourcing to reduce supply shortage of the contracting supplier. From the channel's perspective, an incentive scheme is developed to facilitate the coordination of both the buyer and the contracting supplier, we show that the proposed option contract can allow the supply chain members to share the respective risks involved in the production and selling processes. Finally, we also provide qualitative insights based on numerical examples of the centralised and decentralised solutions.

  6. Visibility of children behind 2010-2013 model year passenger vehicles using glances, mirrors, and backup cameras and parking sensors.

    Science.gov (United States)

    Kidd, David G; Brethwaite, Andrew

    2014-05-01

    This study identified the areas behind vehicles where younger and older children are not visible and measured the extent to which vehicle technologies improve visibility. Rear visibility of targets simulating the heights of a 12-15-month-old, a 30-36-month-old, and a 60-72-month-old child was assessed in 21 2010-2013 model year passenger vehicles with a backup camera or a backup camera plus parking sensor system. The average blind zone for a 12-15-month-old was twice as large as it was for a 60-72-month-old. Large SUVs had the worst rear visibility and small cars had the best. Increases in rear visibility provided by backup cameras were larger than the non-visible areas detected by parking sensors, but parking sensors detected objects in areas near the rear of the vehicle that were not visible in the camera or other fields of view. Overall, backup cameras and backup cameras plus parking sensors reduced the blind zone by around 90 percent on average and have the potential to prevent backover crashes if drivers use the technology appropriately. Copyright © 2014 Elsevier Ltd. All rights reserved.

  7. Tracer techniques for urine volume determination and urine collection and sampling back-up system

    Science.gov (United States)

    Ramirez, R. V.

    1971-01-01

    The feasibility, functionality, and overall accuracy of the use of lithium were investigated as a chemical tracer in urine for providing a means of indirect determination of total urine volume by the atomic absorption spectrophotometry method. Experiments were conducted to investigate the parameters of instrumentation, tracer concentration, mixing times, and methods for incorporating the tracer material in the urine collection bag, and to refine and optimize the urine tracer technique to comply with the Skylab scheme and operational parameters of + or - 2% of volume error and + or - 1% accuracy of amount of tracer added to each container. In addition, a back-up method for urine collection and sampling system was developed and evaluated. This back-up method incorporates the tracer technique for volume determination in event of failure of the primary urine collection and preservation system. One chemical preservative was selected and evaluated as a contingency chemical preservative for the storage of urine in event of failure of the urine cooling system.

  8. LHCb: Fast Readout Control for the upgraded readout architecture of the LHCb experiment at CERN

    CERN Multimedia

    Alessio, F

    2013-01-01

    The LHCb experiment at CERN has proposed an upgrade towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity with an upgraded LHCb detector. As a consequence, the various LHCb sub-systems in the readout architecture will be upgraded to cope with higher sub-detector occupancies, higher rate, and higher readout load. The new architecture, new functionalities, and the first hardware implementation of a new LHCb Readout Control system (commonly referred to as S-TFC) for the upgraded LHCb experiment is here presented. Our attention is focused in describing solutions for the distribution of clock and timing information to control the entire upgraded readout architecture by profiting of a bidirectional optical network and powerful FPGAs, including a real-time mechanism to synchronize the entire system. Solutions and implementations are presented, together with first results on the simulation and the validation of the system.

  9. Report of a consultants' meeting on insights from PSA results on the programmes for safety upgrading of WWER NPPs. Extrabudgetary programme on the safety of WWER and RBMK nuclear power plants

    International Nuclear Information System (INIS)

    1996-11-01

    The objective of the meeting was to compare the insight from plant specific PSA studies with the safety upgrading programme of WWER NPPs. The PSAs were reviewed considering the scope, level and detail of PSA models and results of IAEA peer reviews. Safety improvements which are not normally included in PSAs were also considered. The review specifically considers for each plant specific PSA: the dominant initiating events and accident sequences contributing to core damage; and, the importance of systems, components and human actions to be used for prioritizing actions. 4 refs, tabs

  10. Divertor radiation in the ASDEX upgrade tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Sehmer, Till; Bernert, Matthias; Koll, Juergen; Meister, Hans; Wischmeier, Marco; Fantz, Ursel [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstrasse 2, 85748 Garching (Germany); Reimold, Felix [Forschungszentrum Juelich GmbH, Institut fuer Energie- und Klimaforschung - Plasmaphysik, 52425 Juelich (Germany); Collaboration: The ASDEX Upgrade Team

    2016-07-01

    To reduce in ITER the expected power flux density onto the divertor target, the plasma-wall interaction in the divertor needs to be strongly reduced. The fundamental path to achieve this is using radiation from seeded impurities, whereas the localization of this radiation (e.g. inside/outside confined region), which could have an impact onto the power balance, is a key challenge. The absolute radiated power distribution can be measured by foil bolometers. To study at the ASDEX Upgrade tungsten divertor the localization and quantification of radiation, the respective line of sight density of the bolometers has been improved by two additional cameras. The divertor radiation enhanced by nitrogen (N{sub 2}) seeding has been investigated, using variations of (1) the external heating power or (2) the N{sub 2} seeding rate. While in both cases the inner divertor stays fully detached, measurements indicate that the region of dominant radiation moves from the inner divertor through the X-Point into the confined region. In the outer divertor however, the measurements indicate either an immediate upwards shift or a continuous movement of the radiation away from the target, depending on experimental conditions.

  11. US utility I ampersand C upgrade initiative

    International Nuclear Information System (INIS)

    Wilkinson, D.

    1993-01-01

    This paper describes an initiative which is being pursued to address the problems associated with the increasing obsolescence of instrumentation and control (I ampersand C) systems in nuclear power plants. Such efforts will improve safety, availability, and reliability of plant operation. The program presented is a joint plan between EPRI, utilities, and vendors, to bring about the development of technology to meet these needs, to encourage the private sector to develop such technology, and to prove to utilities the value and utility in applying such technology to upgrade their facilities. Part of this plan is demonstration programs where plant-wide sensor and I ampersand C improvements can be implemented, in a documented manner, to provide R ampersand D information on their performance, functionality, and reliability. The intent is to reduce the costs and shorten the learning curve associated with the utilization of modern I ampersand C equipment

  12. PEP-II Transverse Feedback Electronics Upgrade

    International Nuclear Information System (INIS)

    Weber, J.; Chin, M.; Doolittle, L.; Akre, R.

    2005-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(R) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design

  13. Big advance towards the LHC upgrade

    CERN Multimedia

    CERN Bulletin

    2010-01-01

    The LHC is currently the world’s most powerful accelerator. With its technical achievements it has already set world records. However, big science looks very far ahead in time and is already preparing already for the LHC’s magnet upgrade, which should involve a 10-fold increase of the collision rates toward the end of the next decade. The new magnet technology involves the use of an advanced superconducting material that has just started to show its potential.   The first Long Quadrupole Shell (LQS01) model during assembly at Fermilab. The first important step in the qualification of the new technology for use in the LHC was achieved at the beginning of December when the US LHC Accelerator Research Program (LARP) – a consortium of Brookhaven National Laboratory, Fermilab, Lawrence Berkeley National Laboratory and the SLAC National Accelerator Laboratory founded by US Department Of Energy (DOE) in 2003 – successfully tested the first long focussing magnet th...

  14. Superconducting Cavity Development for the CEBAF Upgrade

    International Nuclear Information System (INIS)

    I.E. Campisi; J.R. Delayen; L.R. Doolittle; P.Kneisel; J. Mammosser; L. Phillips

    1999-01-01

    Long-term plans for CEBAF at Jefferson Lab call for achieving 12 GeV in the middle of the next decade and 24 GeV after 2010. In support of these plans, an Upgrade Cryomodule, capable of providing more than twice the operating voltage of the existing CEBAF modules within the same length, is being developed. In particular, this requires the development of superconducting cavities capable of consistently operating at gradients above 12 MV/m and Q approximately 10 10 . We have engaged in a complete review of all the processes and procedures involved in the fabrication and assembly of cavities, and are modifying our chemical processing, cleaning, and assembly facilities. While we have retained the cell shape of existing CEBAF cavities, the new superconducting structure will be substantially different in several respects, such as the higher-order-modes damping and the fundamental power coupling systems. Design features and experimental results will be presented

  15. PEP-II Transverse Feedback Electronics Upgrade

    International Nuclear Information System (INIS)

    Weber, J.M.; Chin, M.J.; Doolittle, L.R.; Akre, R.

    2006-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(reg s ign) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design

  16. PEP-II Transverse Feedback Electronics Upgrade

    CERN Document Server

    Weber, Jonah; Chin, Michael; Doolittle, Lawrence

    2005-01-01

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx® ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  17. Frequency tuning of the CEBAF upgrade cavities

    International Nuclear Information System (INIS)

    J.R. Delayen; L. Doolittle; E. Feldl; V. Nguyen; W. Sachleben

    1999-01-01

    Long-term plans for CEBAF at Jefferson Lab calls for achieving 12 GeV in the middle of the next decade and 24 GeV after 2010. In support of these plans, an Upgrade Cryomodule capable of providing more than twice the voltage of the existing ones is under development. One requirement is to operate the superconducting cavities, which are 40% longer than existing ones, at 2.5 times the original design gradient with the same amount of rf power. This puts stringent requirements on the accuracy of the frequency tuner: range of 400 kHz and resolution of 1 Hz. A new tuner design to meet these requirements is under development. This system avoids problem areas of previous designs by holding to the principles of not placing moving parts in the vacuum and/or low temperature space, and of having all drive components readily accessible for maintenance and replacement without cryomodule warm-up

  18. The UA1 upgrade calorimeter trigger processor

    International Nuclear Information System (INIS)

    Bains, M.; Charleton, D.; Ellis, N.; Garvey, J.; Gregory, J.; Jimack, M.P.; Jovanovic, P.; Kenyon, I.R.; Baird, S.A.; Campbell, D.; Cawthraw, M.; Coughlan, J.; Flynn, P.; Galagedera, S.; Grayer, G.; Halsall, R.; Shah, T.P.; Stephens, R.; Biddulph, P.; Eisenhandler, E.; Fensome, I.F.; Landon, M.; Robinson, D.; Oliver, J.; Sumorok, K.

    1990-01-01

    The increased luminosity of the improved CERN Collider and the more subtle signals of second-generation collider physics demand increasingly sophisticated triggering. We have built a new first-level trigger processor designed to use the excellent granularity of the UA1 upgrade calorimeter. This device is entirely digital and handles events in 1.5 μs, thus introducing no dead time. Its most novel feature is fast two-dimensional electromagnetic cluster-finding with the possibility of demanding an isolated shower of limited penetration. The processor allows multiple combinations of triggers on electromagnetic showers, hadronic jets and energy sums, including a total-energy veto of multiple interactions and a full vector sum of missing transverse energy. This hard-wired processor is about five times more powerful than its predecessor, and makes extensive use of pipelining techniques. It was used extensively in the 1988 and 1989 runs of the CERN Collider. (orig.)

  19. The UA1 upgrade calorimeter trigger processor

    International Nuclear Information System (INIS)

    Bains, N.; Baird, S.A.; Biddulph, P.

    1990-01-01

    The increased luminosity of the improved CERN Collider and the more subtle signals of second-generation collider physics demand increasingly sophisticated triggering. We have built a new first-level trigger processor designed to use the excellent granularity of the UA1 upgrade calorimeter. This device is entirely digital and handles events in 1.5 μs, thus introducing no deadtime. Its most novel feature is fast two-dimensional electromagnetic cluster-finding with the possibility of demanding an isolated shower of limited penetration. The processor allows multiple combinations of triggers on electromagnetic showers, hadronic jets and energy sums, including a total-energy veto of multiple interactions and a full vector sum of missing transverse energy. This hard-wired processor is about five times more powerful than its predecessor, and makes extensive use of pipelining techniques. It was used extensively in the 1988 and 1989 runs of the CERN Collider. (author)

  20. Review of current and proposed reactor upgrades

    International Nuclear Information System (INIS)

    Moon, R.M.

    1985-01-01

    In an effort to foresee the future health of neutron scattering, a survey of plans to upgrade reactors and associated experimental facilities was undertaken. The results indicate that we are now entering a period characterized by a substantial reinvestment in reactor sources and expansion in the number of neutron scattering instruments. For the group of institutions participating in this survey there will be a total investment in improved sources and experimental facilities of $500 M to $1,000 M over the next decade. This investment will result in a 30 to 40% increase in the total power of research reactors and an increase of 30 to 50% in the number of neutron scattering instruments. It is therefore reasonable to anticipate an approximate doubling in the number of reactor neutrons incident on samples in the mid 90s compared to the present