WorldWideScience

Sample records for atlas construction site

  1. Probabilistic liver atlas construction.

    Science.gov (United States)

    Dura, Esther; Domingo, Juan; Ayala, Guillermo; Marti-Bonmati, Luis; Goceri, E

    2017-01-13

    Anatomical atlases are 3D volumes or shapes representing an organ or structure of the human body. They contain either the prototypical shape of the object of interest together with other shapes representing its statistical variations (statistical atlas) or a probability map of belonging to the object (probabilistic atlas). Probabilistic atlases are mostly built with simple estimations only involving the data at each spatial location. A new method for probabilistic atlas construction that uses a generalized linear model is proposed. This method aims to improve the estimation of the probability to be covered by the liver. Furthermore, all methods to build an atlas involve previous coregistration of the sample of shapes available. The influence of the geometrical transformation adopted for registration in the quality of the final atlas has not been sufficiently investigated. The ability of an atlas to adapt to a new case is one of the most important quality criteria that should be taken into account. The presented experiments show that some methods for atlas construction are severely affected by the previous coregistration step. We show the good performance of the new approach. Furthermore, results suggest that extremely flexible registration methods are not always beneficial, since they can reduce the variability of the atlas and hence its ability to give sensible values of probability when used as an aid in segmentation of new cases.

  2. ATLAS construction status

    International Nuclear Information System (INIS)

    Jenni, P.

    2006-01-01

    The ATLAS detector is being constructed at the LHC, in view of a data-taking startup in 2007. This report concentrates on the progress and the technical challenges of the detector construction, and summarizes the status of the work as of August 2004. The project is on track to allow the highly motivated ATLAS Collaboration to enter into a new exploratory domain of high-energy physics in 2007. (author)

  3. The Director-General visits the ATLAS construction site at Point 1

    CERN Multimedia

    Patrice Loiez

    1998-01-01

    Photo 05 : Claude Guitton (left), Project Manager for the EDF/Knight Piesold joint venture responsible for design and site supervision for LHC civil engineering at Point 1 takes the Director-General Chris Llewellyn Smith and LHC Project Leader Lyn Evans on a tour of the site.

  4. A CD with the wishes for the 21st century from thousands of readers of the science magazine "Newton", was buried at the Atlas construction site on 16.03.2000 (handling the CD: Giorgio Riviecco, Editor of "Newton")

    CERN Multimedia

    Laurent Guiraud

    2000-01-01

    A CD with the wishes for the 21st century from thousands of readers of the science magazine "Newton", was buried at the Atlas construction site on 16.03.2000 (handling the CD: Giorgio Riviecco, Editor of "Newton")

  5. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  6. ATLAS construction: A status report

    CERN Document Server

    Sfyrla, Anna

    2006-01-01

    ATLAS is a general purpose p-p collider detector being constructed for the CERN Large Hadron Collider (LHC). It is located in one of the two high luminosity bunch crossing points (peak luminosity of 1 0 3 4 c m - 2 s _ 1 ) of the LHC. It consists of 3 main sections. Located close to the beam axis, the tracking system employs pixel detectors, silicon microstrip modules and transition radiation straws, all within a 2 Tesla superconducting solenoid. The tracker is surrounded by the electromagnetic and hadronic calorimeters. In the outer part of the detector, 8 superconducting coils define an open toroidal magnetic field for muon detection. The construction status of the ATLAS detector towards being ready for the first collisions in 2007 will be presented, with particular emphasis on the construction and projected performance of the tracking system.

  7. ATLAS, Construction of a Giant

    CERN Multimedia

    McCubbin, Norman

    2004-01-01

    One of the most impressive aspects of modern particle physics in the scale of the equipment. The accelerators require the construction of underground tunnels many kilometers long containing evacuated pipes through which beams of particles travel at incredibly high energies. Even more spectacular are the gigantic complex assemblies that make up the experiments themselves

  8. Construction of the ATLAS SCT Endcap modules

    International Nuclear Information System (INIS)

    Snow, Stephen W.

    2007-01-01

    The ATLAS Semi-Conductor Tracker (SCT) uses silicon strip detectors to measure trajectories of charged particles coming from 14 TeV proton-proton collisions at the Large Hadron Collider at CERN. The SCT provides at least four space points, in the radial range of 27-50 cm from the beam, for tracks within the angular acceptance vertical bar η vertical bar <2.5. The SCT is built up of 4088 modules, each consisting of two or four silicon detectors, a hybrid carrying several readout ASICS, and other components to support, cool and align the detectors. We report on construction of over 2000 end-cap modules of the SCT by a group of 14 institutes from seven countries. A key aspect of the project was to fully standardise the final module tests and to insist that test data from all institutes was stored in a single central database, while leaving institutes flexibility to vary their module assembly methods to suit local circumstances. First the module specifications and tests used for quality control are summarised, then we describe the main test results. Finally, we report our experience in terms of component quality, assembly and testing rates, yield of good modules and causes of lost modules. At the outset we assumed losses during assembly of 15% and procured components accordingly; in fact, losses were around 7%

  9. Automating ATLAS Computing Operations using the Site Status Board

    CERN Document Server

    Andreeva, J; The ATLAS collaboration; Campana, S; Di Girolamo, A; Espinal Curull, X; Gayazov, S; Magradze, E; Nowotka, MM; Rinaldi, L; Saiz, P; Schovancova, J; Stewart, GA; Wright, M

    2012-01-01

    The automation of operations is essential to reduce manpower costs and improve the reliability of the system. The Site Status Board (SSB) is a framework which allows Virtual Organizations to monitor their computing activities at distributed sites and to evaluate site performance. The ATLAS experiment intensively uses SSB for the distributed computing shifts, for estimating data processing and data transfer efficiencies at a particular site, and for implementing automatic exclusion of sites from computing activities, in case of potential problems. ATLAS SSB provides a real-time aggregated monitoring view and keeps the history of the monitoring metrics. Based on this history, usability of a site from the perspective of ATLAS is calculated. The presentation will describe how SSB is integrated in the ATLAS operations and computing infrastructure and will cover implementation details of the ATLAS SSB sensors and alarm system, based on the information in SSB. It will demonstrate the positive impact of the use of SS...

  10. Mechanical construction and installation of the ATLAS tile calorimeter

    Energy Technology Data Exchange (ETDEWEB)

    Abdallah, J [IFIC, Centro Mixto Universidad de Valencia-CSIC, E46100 Burjassot, Valencia (Spain); Adragna, P; Bosi, F [Pisa University and INFN, Pisa (Italy); Alexa, C; Boldea, V [Institute of Atomic Physics, Bucharest (Romania); Alves, R [LIP and FCTUC University of Coimbra (Portugal); Amaral, P; Andresen, X; Behrens, A; Blocki, J [CERN, Geneva (Switzerland); Ananiev, A [LIP and IDMEC-IST, Lisbon (Portugal); Anderson, K [University of Chicago, Chicago, Illinois (United States); Antonaki, A [University of Athens, Athens (Greece); Batusov, V [JINR, Dubna (Russian Federation); Bednar, P [Comenius University, Bratislava (Slovakia); Bergeaas, E; Bohm, C [Stockholm University, Stockholm (Sweden); Biscarat, C [LPC Clermont-Ferrand, Université Blaise Pascal, Clermont-Ferrand (France); Blanch, O; Blanchot, G [Institut de Fisica d' Altes Energies, Universitat Autònoma de Barcelona, Barcelona (Spain); others, and

    2013-11-01

    This paper summarises the mechanical construction and installation of the Tile Calorimeter for the ATLAS experiment at the Large Hadron Collider in CERN, Switzerland. The Tile Calorimeter is a sampling calorimeter using scintillator as the sensitive detector and steel as the absorber and covers the central region of the ATLAS experiment up to pseudorapidities ±1.7. The mechanical construction of the Tile Calorimeter occurred over a period of about 10 years beginning in 1995 with the completion of the Technical Design Report and ending in 2006 with the installation of the final module in the ATLAS cavern. During this period approximately 2600 metric tons of steel were transformed into a laminated structure to form the absorber of the sampling calorimeter. Following instrumentation and testing, which is described elsewhere, the modules were installed in the ATLAS cavern with a remarkable accuracy for a structure of this size and weight.

  11. Mechanical construction and installation of the ATLAS tile calorimeter

    International Nuclear Information System (INIS)

    Abdallah, J; Adragna, P; Bosi, F; Alexa, C; Boldea, V; Alves, R; Amaral, P; Andresen, X; Behrens, A; Blocki, J; Ananiev, A; Anderson, K; Antonaki, A; Batusov, V; Bednar, P; Bergeaas, E; Bohm, C; Biscarat, C; Blanch, O; Blanchot, G

    2013-01-01

    This paper summarises the mechanical construction and installation of the Tile Calorimeter for the ATLAS experiment at the Large Hadron Collider in CERN, Switzerland. The Tile Calorimeter is a sampling calorimeter using scintillator as the sensitive detector and steel as the absorber and covers the central region of the ATLAS experiment up to pseudorapidities ±1.7. The mechanical construction of the Tile Calorimeter occurred over a period of about 10 years beginning in 1995 with the completion of the Technical Design Report and ending in 2006 with the installation of the final module in the ATLAS cavern. During this period approximately 2600 metric tons of steel were transformed into a laminated structure to form the absorber of the sampling calorimeter. Following instrumentation and testing, which is described elsewhere, the modules were installed in the ATLAS cavern with a remarkable accuracy for a structure of this size and weight

  12. Quality assurance during site construction

    International Nuclear Information System (INIS)

    Eymess, K.J.; Haas, R.; Wellnitz, G.

    1980-01-01

    Quality Assurance for Nuclear Power Plants under consideration of pipe assembling. Flow of Quality Requirements during: - Desing - Construction - Procurement - Prefabrication - Site. Organizational Requirements and Measurements during Erection: - Incoming Control - Material Storage - Surveillance of Tools - Weld Surveillance - Nondestructive Testing - Cleaning - Final Documentation. Qualification and Training of QA Personnel. (orig.)

  13. Yucca Mountain Project Site Atlas: Volume 1: Draft

    International Nuclear Information System (INIS)

    1988-10-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) Project Site Atlas is a reference document of field activities which have been, or are being, conducted by the US Department of Energy (DOE) to support investigations of Yucca Mountain as a potential site for an underground repository for high-level radioactive waste. These investigations, as well as future investigations, will yield geologic, geophysical, geochemical, geomechanical, hydrologic, volcanic, seismic, and environmental data necessary to characterize Yucca Mountain and its regional setting. This chapter summarizes the background of the NNWSI Project and the objective, scope, structure, and preparation of the Site Atlas. Chapter 2 describes in more detail the bibliography and map portfolio portions of the Atlas, which are presented in Chapter 4 and Volume 2, respectively. Chapter 3 describes how to use the Atlas. The objective of the Site Atlas is to create a management tool for the DOE Waste Management Project Office (WMPO) that will allow the WMPO to compile and disseminate information regarding the location of NNWSI Project field investigations, and document the permits acquired and the environmental, archaeological, and socioeconomic surveys conducted to support those investigations. The information contained in the Atlas will serve as a historical reference of site investigation field activities. A companion document to the Atlas is the NNWSI Project Surface Based Investigations Plan (SBIP)

  14. Constructing a WISE High Resolution Galaxy Atlas

    Science.gov (United States)

    Jarrett, T. H.; Masci, F.; Tsai, C. W.; Petty, S.; Cluver, M.; Assef, Roberto J.; Benford, D.; Blain, A.; Bridge, C.; Donoso, E.; hide

    2012-01-01

    After eight months of continuous observations, the Wide-field Infrared Survey Explorer (WISE) mapped the entire sky at 3.4 micron, 4.6 micron, 12 micron, and 22 micron. We have begun a dedicated WISE High Resolution Galaxy Atlas project to fully characterize large, nearby galaxies and produce a legacy image atlas and source catalog. Here we summarize the deconvolution techniques used to significantly improve the spatial resolution of WISE imaging, specifically designed to study the internal anatomy of nearby galaxies. As a case study, we present results for the galaxy NGC 1566, comparing the WISE enhanced-resolution image processing to that of Spitzer, Galaxy Evolution Explorer, and ground-based imaging. This is the first paper in a two-part series; results for a larger sample of nearby galaxies are presented in the second paper.

  15. The ATLAS Insertable B-Layer: from construction to operation

    CERN Document Server

    La Rosa, Alessandro; The ATLAS collaboration

    2016-01-01

    The ATLAS Insertable B-Layer (IBL) is a fourth layer of pixel detectors, and has been installed in May 2014 at a radius of 3.3 cm between the existing Pixel Detector and a new smaller radius beam-pipe. The new detector, built to cope with high radiation and occupancy, is the first large scale application of 3D detectors and CMOS 130nm technology. The IBL detector construction was achieved within about two years starting from mid-2012 to the May 2014 installation in ATLAS, a very tight schedule to meet the ATLAS installation and detector closure before starting the Run2 in Spring 2015. The key features and challenges met during the IBL project will be presented, as well as its commissioning and operational experience in LHC.

  16. The ATLAS Liquid Argon Calorimeter: Construction, Integration, Commissioning

    International Nuclear Information System (INIS)

    Aleksa, Martin

    2006-01-01

    The ATLAS liquid argon (LAr) calorimeter system consists of an electromagnetic barrel calorimeter and two end caps with electromagnetic, hadronic and forward calorimeters. The liquid argon sampling technique, with an accordion geometry was chosen for the barrel electromagnetic calorimeter (EMB) and adapted to the end cap (EMEC). The hadronic end cap calorimeter (HEC) uses a copper-liquid argon sampling technique with flat plate geometry and is subdivided in depth in two wheels per end-cap. Finally, the forward calorimeter (FCAL) is composed of three modules employing cylindrical electrodes with thin liquid argon gaps.The construction of the full calorimeter system is complete since mid-2004. Production modules constructed in the home institutes were integrated into wheels at CERN in 2003-2004, and inserted into the three cryostats. They passed their first complete cold test before the lowering into the ATLAS cavern. Results of quality checks (e.g. electrical, mechanical, ...) performed on all the 190304 read-out channels after cool down will be reported. End 2004 the ATLAS barrel electromagnetic (EM) calorimeter was installed in the ATLAS cavern and since summer 2005 the front-end electronics are being connected and tested. Results of this first commissioning phase will be shown to demonstrate the high standards of quality control for our detectors

  17. Grid site testing for ATLAS with HammerCloud

    International Nuclear Information System (INIS)

    Elmsheuser, J; Hönig, F; Legger, F; LLamas, R Medrano; Sciacca, F G; Ster, D van der

    2014-01-01

    With the exponential growth of LHC (Large Hadron Collider) data in 2012, distributed computing has become the established way to analyze collider data. The ATLAS grid infrastructure includes more than 130 sites worldwide, ranging from large national computing centers to smaller university clusters. HammerCloud was previously introduced with the goals of enabling virtual organisations (VO) and site-administrators to run validation tests of the site and software infrastructure in an automated or on-demand manner. The HammerCloud infrastructure has been constantly improved to support the addition of new test workflows. These new workflows comprise e.g. tests of the ATLAS nightly build system, ATLAS Monte Carlo production system, XRootD federation (FAX) and new site stress test workflows. We report on the development, optimization and results of the various components in the HammerCloud framework.

  18. Grid Site Testing for ATLAS with HammerCloud

    CERN Document Server

    Elmsheuser, J; The ATLAS collaboration; Legger, F; Medrano LLamas, R; Sciacca, G; van der Ster, D

    2014-01-01

    With the exponential growth of LHC (Large Hadron Collider) data in 2012, distributed computing has become the established way to analyze collider data. The ATLAS grid infrastructure includes more than 130 sites worldwide, ranging from large national computing centers to smaller university clusters. HammerCloud was previously introduced with the goals of enabling VO- and site-administrators to run validation tests of the site and software infrastructure in an automated or on-demand manner. The HammerCloud infrastructure has been constantly improved to support the addition of new test work-flows. These new work-flows comprise e.g. tests of the ATLAS nightly build system, ATLAS MC production system, XRootD federation FAX and new site stress test work-flows. We report on the development, optimization and results of the various components in the HammerCloud framework.

  19. Grid Site Testing for ATLAS with HammerCloud

    CERN Document Server

    Elmsheuser, J; The ATLAS collaboration; Legger, F; Medrano LLamas, R; Sciacca, G; van der Ster, D

    2013-01-01

    With the exponential growth of LHC (Large Hadron Collider) data in 2012, distributed computing has become the established way to analyze collider data. The ATLAS grid infrastructure includes more than 130 sites worldwide, ranging from large national computing centers to smaller university clusters. HammerCloud was previously introduced with the goals of enabling VO- and site-administrators to run validation tests of the site and software infrastructure in an automated or on-demand manner. The HammerCloud infrastructure has been constantly improved to support the addition of new test work-flows. These new work-flows comprise e.g. tests of the ATLAS nightly build system, ATLAS MC production system, XRootD federation FAX and new site stress test work-flows. We report on the development, optimization and results of the various components in the HammerCloud framework.

  20. Improved ATLAS HammerCloud Monitoring for local Site Administration

    CERN Document Server

    Boehler, Michael; The ATLAS collaboration; Hoenig, Friedrich; Legger, Federica; Sciacca, Francesco Giovanni; Mancinelli, Valentina

    2015-01-01

    Every day hundreds of tests are run on the Worldwide LHC Computing Grid for the ATLAS, and CMS experiments in order to evaluate the performance and reliability of the different computing sites. All this activity is steered, controlled, and monitored by the HammerCloud testing infrastructure. Sites with failing functionality tests are auto-excluded from the ATLAS computing grid, therefore it is essential to provide a detailed and well organized web interface for the local site administrators such that they can easily spot and promptly solve site issues. Additional functionality has been developed to extract and visualize the most relevant information. The site administrators can now be pointed easily to major site issues which lead to site blacklisting as well as possible minor issues that are usually not conspicuous enough to warrant the blacklisting of a specific site, but can still cause undesired effects such as a non-negligible job failure rate. This paper summarizes the different developments and optimiz...

  1. Improved ATLAS HammerCloud Monitoring for local Site Administration

    CERN Document Server

    Boehler, Michael; The ATLAS collaboration; Hoenig, Friedrich; Legger, Federica

    2015-01-01

    Every day hundreds of tests are run on the Worldwide LHC Computing Grid for the ATLAS, CMS, and LHCb experiments in order to evaluate the performance and reliability of the different computing sites. All this activity is steered, controlled, and monitored by the HammerCloud testing infrastructure. Sites with failing functionality tests are auto-excluded from the ATLAS computing grid, therefore it is essential to provide a detailed and well organized web interface for the local site administrators such that they can easily spot and promptly solve site issues. Additional functionalities have been developed to extract and visualize the most relevant information. The site administrators can now be pointed easily to major site issues which lead to site blacklisting as well as possible minor issues that are usually not conspicuous enough to warrant the blacklisting of a specific site, but can still cause undesired effects such as a non-negligible job failure rate. This contribution summarizes the different developm...

  2. The construction of the ATLAS semi-conductor tracker

    International Nuclear Information System (INIS)

    Jones, Tim

    2006-01-01

    The ATLAS (A Toroidal LHC ApparatuS) experiment at the Large Hadron Collider (LHC) at CERN has been designed to explore physics at the TeV energy scale and will be commissioned in 2007. In the innermost region of the experiment is a charged particle tracker, the Inner Detector of which the Semiconductor Tracker (SCT) is a major component. The SCT comprises a central barrel section enclosed by two endcaps (A and C). The construction of the major components of the ATLAS Semi-conductor tracker (SCT) is now nearing completion. Following a brief description of the design of the SCT, the logistics and organisation of the construction phase of the project are discussed. Central to the delivery of a high quality detector is the testing of large numbers of modules both during assembly and after they are mounted on their final support structures. The results of these tests for endcap C are presented showing that the electrical performance of the 988 modules to be installed in ATLAS is compatible with the specifications required

  3. The ATLAS Insertable B-Layer: from construction to operation

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00218666; The ATLAS collaboration

    2016-01-01

    The ATLAS Insertable B-Layer (IBL) is the innermost layer of pixel detectors, and was installed in May 2014 at a radius of 3.3 cm from the beam axis, between the existing Pixel detector and a new smaller radius beam-pipe. The new detector, built to cope with high radiation and occupancy, is the first large scale application of 3D sensors and CMOS 130 nm technology. The IBL detector construction was completed within about two years (2012-2014), and the key features and challenges met during the IBL project are presented, as well as its commissioning and operational experience at the LHC

  4. Construction and performance of the ATLAS silicon microstrip barrel modules

    International Nuclear Information System (INIS)

    Kondo, T.; Apsimon, R.; Beck, G.A.; Bell, P.; Brenner, R.; Bruckman de Renstrom, P.; Carter, A.A.; Carter, J.R.; Charlton, D.; Dabrowski, W.; Dorholt, O.; Ekelof, T.; Eklund, L.; Gibson, M.; Gadomski, S.; Grillo, A.; Grosse-Knetter, J.; Haber, C.; Hara, K.; Hill, J.C.; Ikegami, Y.; Iwata, Y.; Johansen, L.G.; Kohriki, T.; Macpherson, A.; McMahon, S.; Moorhead, G.; Morin, J.; Morris, J.; Morrissey, M.; Nagai, K.; Nakano, I.; Pater, J.; Pernegger, H.; Perrin, E.; Phillips, P.; Robinson, D.; Skubic, B.; Spencer, N.; Stapnes, S.; Stugu, B.; Takashima, R.; Terada, S.; Tyndel, M.; Ujiie, N.; Unno, Y.; Vos, M.

    2002-01-01

    The ATLAS Semiconductor Tracker (SCT) consists of four barrel cylinders and 18 end-cap disks. This paper describes the SCT modules of the barrel region, of which more than 2000 are about to be constructed. The module design is fixed. Its design concept is given together with the electrical, thermal and mechanical specifications. The pre-series production of the barrel modules is underway using mass-production procedures and jigs. The pre-series modules have given satisfactory performances on noise, noise occupancy, electrical as well as mechanical and thermal properties. In addition, irradiated modules were demonstrated to work successfully. Also first results from a 10-module system test are given

  5. Turbidity monitoring at select MDOT construction sites.

    Science.gov (United States)

    2012-06-01

    The objective of this project was to establish baseline turbidity conditions at select construction : sites by establishing a water quality monitoring program and documenting MDOT approved : BMPs on site. In 2009 the United States Environmental Prote...

  6. The ATLAS hadronic tile calorimeter from construction toward physics

    CERN Document Server

    Adragna, P; Anderson, K; Antonaki, A; Batusov, V; Bednar, P; Binet, S; Biscarat, C; Blanchot, G; Bogush, A A; Bohm, C; Boldea, V; Bosman, M; Bromberg, C; Budagov, Yu A; Caloba, L; Calvet, D; Carvalho, J; Castelo, J; Castillo, M V; Sforza, M C; Cavasinni, V; Cerqueira, A S; Chadelas, R; Costanzo, D; Cogswell, F; Constantinescu, S; Crouau, M; Cuenca, C; Damazio, D O; Daudon, F; David, M; Davidek, T; De, K; Del Prete, T; Di Girolamo, B; Dita, S; Dolejsi, J; Dolezal, Z; Dotti, A; Downing, R; Efthymiopoulos, I; Errede, D; Errede, S; Farbin, A; Fassouliotis, D; Fedorko, I; Fenyuk, A; Ferdi, C; Ferrer, A; Flaminio, V; Fullana, E; Garde, V; Giakoumopoulou, V; Gildemeister, O; Gilewsky, V; Giangiobbe, V; Giokaris, N; Gomes, A; González, V; Grabskii, V; Grenier, P; Gris, P; Guarino, V; Guicheney, C; Sen-Gupta, A; Hakobyan, H; Haney, M; Henriques, A; Higón, E; Holmgren, S O; Hurwitz, M; Huston, J; Iglesias, C; And, K J; Junk, T; Karyukhin, A N; Khubua, J; Klereborn, J; Korolkov, I Ya; Krivkova, P; Kulchitskii, Yu A; Kurochkin, Yu; Kuzhir, P; Lambert, D; Le Compte, T; Lefèvre, R; Leitner, R; Lembesi, M; Li, J; Liablin, M; Lokajícek, M; Lomakin, Y; Amengual, J M L; Lupi, A; Maidantchik, C; Maio, A; Maliukov, S; Manousakis, A; Marques, C; Marroquim, F; Martin, F; Mazzoni, E; Montarou, G; Merritt, F S; Myagkov, A; Miller, R; Minashvili, I A; Miralles, L; Némécek, S; Nessi, M; Nodulman, L; Norniella, O; Onofre, A; Oreglia, M J; Pantea, D; Pallin, D; Pilcher, J E; Pina, J; Pinhão, J; Podlyski, F; Portell, X; Poveda, J; Price, L E; Pribyl, L; Proudfoot, J; Ramstedt, M; Reinmuth, G; Richards, R; Roda, C; Romanov, V; Rosnet, P; Roy, P; Rumiantsau, V; Russakovich, N; Salto, O; Salvachúa, B; Sanchis, E; Sanders, H; Santoni, C; Santos, J; Saraiva, J G; Sarri, F; Satsunkevich, I S; Says, L P; Schlager, G; Schlereth, J L; Seixas, J M; Selldén, B; Shevtsov, P; Shochet, M; Da Silva, P; Silva, J; Simaitis, V; Sissakian, A N; Solodkov, A; Solovyanov, O; Sosebee, M; Spanó, F; Stanek, R; Starchenko, E A; Starovoitov, P; Suk, M; Sykora, I; Tang, F; Tas, P; Teuscher, R; Tokar, S; Topilin, N; Torres, J; Tsulaia, V; Underwood, D; Usai, G; Valkár, S; Valls, J A; Vartapetian, A H; Vazeille, F; Vichou, I; Vinogradov, V; Vivarelli, I; Volpi, M; White, A; Zaitsev, A; Zenine, A; Zenis, T

    2006-01-01

    The Tile Calorimeter, which constitutes the central section of the ATLAS hadronic calorimeter, is a non-compensating sampling device made of iron and scintillating tiles. The construction phase of the calorimeter is nearly complete, and most of the effort now is directed toward the final assembly and commissioning in the underground experimental hall. The layout of the calorimeter and the tasks carried out during construction are described, first with a brief reminder of the requirements that drove the calorimeter design. During the last few years a comprehensive test-beam program has been followed in order to establish the calorimeter electromagnetic energy scale, to study its uniformity, and to compare real data to Monte Carlo simulation. The test-beam setup and first results from the data are described. During the test-beam period in 2004, lasting several months, data have been acquired with a complete slice of the central ATLAS calorimeter. The data collected in the test-beam are crucial in order to study...

  7. Management of construction safety at RR site

    International Nuclear Information System (INIS)

    Pathak, B.C.; Khatsuriya, J.R.

    2016-01-01

    Construction industries are one of the most hazardous industries and hence, promotion of safety remains one of the greatest challenges facing construction industry today. According to ILO estimates: Each year at least 60,000 fatal accidents occur on construction sites around the world or one fatal accident every ten minutes. One in six fatal accidents at work occurs on a construction site. In industrialized countries, as many as 25-40 per cent of work related deaths occur on construction sites, even though the sector employs only 6-10 per cent of the workforce. The number of fatalities occurring from construction work in India is also quite disturbing. Though, the fall of person from height and through openings were the major causes for fatal /serious accidents, the risk of fatal accident involving material handling equipment, either during handling or its maintenance is also significantly high due to use of large number of material handling equipments during construction work. (author)

  8. Efficient on-site construction

    DEFF Research Database (Denmark)

    Thuesen, Christian Langhoff; Hvam, Lars

    2011-01-01

    selected market – optimising cost and value. Based on the platform, the company has managed to create a high-quality product at low cost. In fact, they have managed to reduce costs by more than 30 per cent, enabling the company to sell houses to people that normally would not be able to afford a house...... from the German platform such as: platform does not imply that “off-site manufacturing” is the most optimal production method, rather it is a matter of handling complexity; strong commitment and loyalty from the whole organization is needed; importance of having a specific customer focus (target...

  9. Quality assurance during site construction

    International Nuclear Information System (INIS)

    Dommke, J.; Jurgutat, H.

    1980-01-01

    During the time of planing and construction of a nuclear power plant, the following proceeding is approved: - the deliverer of a nuclear power plant provides the reports fixing the quality assurance program, it means that he is responsible to write the safety analysis report, the specifications for the erection of the components, the working manuals and specifications for testing (eg nondestr. testing) - the manufacturing of components or systems will be controlled by an own independent quality assurance group, provided that this group was checked by the quality assurance group of the applicant - the TUeV with its independent assessors will fix the requirements relating to quality assurance in its assessment. On this basis the examination of the applicants specifications, working manuals, testing specifications will be done. The efficiency of quality assurance at the manufacturer and at the applicant will be checked by the TUeV specialists by considering specifications of modifications, repairs or tolerances. A mean point of the quality assurance in Germany is the dynamic adjustment, of an action on the latest state of engineering or science. If there exists a change of rules or guidelines, the quality assurance requirements have to be fit on this state in so far as it is feasible from the technical point of view. (orig./RW)

  10. Wind Atlas for South Africa (WASA) Station and Site Description Report

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling; Hansen, Jens Carsten; Kelly, Mark C.

    As part of the “Wind Atlas for South Africa” project, site inspection trips were carried out by the Council for Scientific and Industrial Research (CSIR) and Risø DTU in April and June of 2011. A total of 10 sites featuring instrumented 60-m masts were visited; the present report summarises...... the findings of the site inspection teams. The main results are descriptions and documentation of the meteorological masts, instruments and site conditions. For each site, the location and magnetic declination have been determined, as well as the sensor boom directions on the mast. Elevation maps have been...... constructed to show the surrounding terrain and photos taken to document the land cover. Finally, the observed wind roses and wind speed distribution as of 1 October 2013 are shown....

  11. Quality assurance during site construction. Pt. 6

    International Nuclear Information System (INIS)

    Schwarz, N.

    1980-01-01

    Scope of 'Site Construction concerning Electrical Equipment' (Installation, erection, commissioning, operation): tasks and organization of Siemens-Field Services Division; organization on site; receiving, incoming inspection and storage of material; installation, erection; (drawings, instructions, documents / execution of installation / personnel qualification). Non conformance and corrective actions; quality records; internal audits. (orig.)

  12. Prospective safety performance evaluation on construction sites.

    Science.gov (United States)

    Wu, Xianguo; Liu, Qian; Zhang, Limao; Skibniewski, Miroslaw J; Wang, Yanhong

    2015-05-01

    This paper presents a systematic Structural Equation Modeling (SEM) based approach for Prospective Safety Performance Evaluation (PSPE) on construction sites, with causal relationships and interactions between enablers and the goals of PSPE taken into account. According to a sample of 450 valid questionnaire surveys from 30 Chinese construction enterprises, a SEM model with 26 items included for PSPE in the context of Chinese construction industry is established and then verified through the goodness-of-fit test. Three typical types of construction enterprises, namely the state-owned enterprise, private enterprise and Sino-foreign joint venture, are selected as samples to measure the level of safety performance given the enterprise scale, ownership and business strategy are different. Results provide a full understanding of safety performance practice in the construction industry, and indicate that the level of overall safety performance situation on working sites is rated at least a level of III (Fair) or above. This phenomenon can be explained that the construction industry has gradually matured with the norms, and construction enterprises should improve the level of safety performance as not to be eliminated from the government-led construction industry. The differences existing in the safety performance practice regarding different construction enterprise categories are compared and analyzed according to evaluation results. This research provides insights into cause-effect relationships among safety performance factors and goals, which, in turn, can facilitate the improvement of high safety performance in the construction industry. Copyright © 2015 Elsevier Ltd. All rights reserved.

  13. Operations Management on The Construction Site

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    this as a refreshing renewal and improvement of practical operations management at the site. However this paper will present a first step of development of a new approach to operations management at the building site, which at the same time builds on, and criticize lean construction for missing the point...... of the knowledge economy. This endeavour is carried out in two ways. First by a reading of the operations management literature. Juxtaposing this with lean construction extentions and the critique developed by other scholars. And also drawing on human resource management approaches. Second through a series......” scheme. In both directions it is revealed that the human resource and knowledge element of building processes is largely left untouched by lean construction methods. It is suggested to introduce at least two more dimensions of operations management at the site than the ones offered in lean construction...

  14. Studies on Labour Safety in Construction Sites

    Directory of Open Access Journals (Sweden)

    S. Kanchana

    2015-01-01

    Full Text Available Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites.

  15. Studies on Labour Safety in Construction Sites

    Science.gov (United States)

    Kanchana, S.; Sivaprakash, P.; Joseph, Sebastian

    2015-01-01

    Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites. PMID:26839916

  16. The Shielding of the ATLAS Forward Region from the point of view of Materials Technology and some Construction Aspects

    CERN Document Server

    Sodomka, J; Palla, J; Pospisvil, S; Vstekl, I

    1998-01-01

    The aim of this note is to discuss a concept and a construction of the ATLAS forward region shielding as a contribution to the chapter on shielding for the ATLAS infrastructure TDR. It follows our previous remarks on this question.

  17. Construction experience at the Canonsburg UMTRA site

    International Nuclear Information System (INIS)

    Thiers, G.R.; Farnes, L.L.; Wathen, T.R.

    1985-01-01

    Construction of on-site stabilization for over 225,000 cubic yards of abandoned uranium mill tailings in Canonsburg, Pennsylvania, began in October 1983, and is scheduled to be completed in December 1985. This paper describes selected construction experience through October 1984. The following selected events and construction items are discussed in this paper: 1. Construction and operation of a 36,000-square foot, fabric-lined sedimentation basin, including difficulties associated with installation of the liner; 2. Assembly and start-up of the contaminated water treatment plant; 3. Construction of the encapsulation cell test fills, to confirm the performance specification governing the compaction; 4. Excavation, relocation, and placement of contaminated materials, including moisture control and density testing of the radioactive materials; 5. Construction difficulties, including disposition of local leachate from the abandoned industrial complex and an increase in the volume of contaminated material to be encapsulated

  18. Intensity and sulci landmark combined brain atlas construction for Chinese pediatric population.

    Science.gov (United States)

    Luo, Yishan; Shi, Lin; Weng, Jian; He, Hongjian; Chu, Winnie C W; Chen, Feiyan; Wang, Defeng

    2014-08-01

    Constructing an atlas from a population of brain images is of vital importance to medical image analysis. Especially in neuroscience study, creating a brain atlas is useful for intra- and inter-population comparison. Research on brain atlas construction has attracted great attention in recent years, but the research on pediatric population is still limited, mainly due to the limited availability and the relatively low quality of pediatric magnetic resonance brain images. This article is targeted at creating a high quality representative brain atlas for Chinese pediatric population. To achieve this goal, we have designed a set of preprocessing procedures to improve the image quality and developed an intensity and sulci landmark combined groupwise registration method to align the population of images for atlas construction. As demonstrated in experiments, the newly constructed atlas can better represent the size and shape of brains of Chinese pediatric population, and show better performance in Chinese pediatric brain image analysis compared with other standard atlases. Copyright © 2014 Wiley Periodicals, Inc.

  19. Mechanical construction and installation of the ATLAS tile calorimeter

    Czech Academy of Sciences Publication Activity Database

    Abdallah, J.; Adragna, P.; Alexa, C.; Lokajíček, Miloš; Němeček, Stanislav; Přibyl, Lukáš

    2013-01-01

    Roč. 8, Nov (2013), 1-26 ISSN 1748-0221 Institutional support: RVO:68378271 Keywords : calorimeter * ATLAS * iron * scintillation counter * central region * CERN Lab * rapidity * ATLAS * CERN LHC Coll Subject RIV: BG - Nuclear, Atomic and Molecular Physics, Colliders Impact factor: 1.526, year: 2013

  20. Quality assurance during site construction. Pt. 1

    International Nuclear Information System (INIS)

    Mueller, J.

    1980-01-01

    The first part of the lecture deals with the Quality Assurance system on the construction site in general. Basic site-related problems during contract implementation and the QA system requirements resulting from them are presented. The compilation of these requirements in a QA program and its inclusion in the site manual in written form are explained. Site organization, personnel qualification and procedures are referred to. Whereas the first part shows what is to be done, the second part shows how it can be put into practice on the site. All the essential points for the assurance of quality are addressed. They include, e.g., review of documents, incoming goods control, in-process surveillance, store controls, identification of components and systems, dealing with changes and deviations, documentation control and audits. By means of examples taken form practice the necessity of a well-functioning QA system, and the importance of quality-assuring measures on the site are pointed out. (orig.)

  1. Construction and Tests of Modules for the ATLAS Pixel Detector

    CERN Document Server

    AUTHOR|(CDS)2068490

    2003-01-01

    The ATLAS Pixel Detector is the innermost layer of the ATLAS tracking system and will contribute significantly to the ATLAS track and vertex reconstruction. The detector consists of identical sensor-chip-hybrid modules, arranged in three barrels in the centre and three disks on either side for the forward region. The position of the pixel detector near the interaction point requires excellent radiation hardness, mechanical and thermal robustness, good long-term stability, all combined with a low material budget. The pre-production phase of such pixel modules has nearly finished, yielding fully functional modules. Results are presented of tests with these modules.

  2. ARC Cache: A solution for lightweight Grid sites in ATLAS

    CERN Document Server

    Garonne, Vincent; The ATLAS collaboration

    2016-01-01

    Many Grid sites have the need to reduce operational manpower, and running a storage element consumes a large amount of effort. In addition, setting up a new Grid site including a storage element involves a steep learning curve and large investment of time. For these reasons so-called storage-less sites are becoming more popular as a way to provide Grid computing resources with less operational overhead. ARC CE is a widely-used and mature Grid middleware which was designed from the start to be used on sites with no persistent storage element. Instead, it maintains a local self-managing cache of data which retains popular data for future jobs. As the cache is simply an area on a local posix shared filesystem with no external-facing service, it requires no extra maintenance. The cache can be scaled up as required by increasing the size of the filesystem or adding new filesystems. This paper describes how ARC CE and its cache are an ideal solution for lightweight Grid sites in the ATLAS experiment, and the integr...

  3. Activities on the site during construction phase

    International Nuclear Information System (INIS)

    Fickel, O.F.

    1977-01-01

    A survey is given of the work done on the site from site-opening till turn over of the plant to the client. After a short introduction to time schedules, manpower on site, site facilities and civil work and constructions, the commissioning and trial operation phase is discussed in detail. This phase begins with finishing the assembly of individual systems and components and ends with the trial operation and the acceptance measurement. During this period the subsystems are started-up in a useful sequence, first from cold, then from hot conditions and are finally operated as a total with nuclear energy. The single steps are: a) commissioning of indivudal systems; b) hot functional test 1 (without fuels) c) baseline inspection at the reactor pressure vessel; d) hot functional test 2 (with fuels); e) preparation for first criticality; f) postcriticality test program; g) trial operation: h) acceptance measurement. (HP) [de

  4. PHWR safety: design, siting and construction

    International Nuclear Information System (INIS)

    Sharma, V.K.

    2002-01-01

    In all activities associated with NPPs viz. siting, design, construction, commissioning and operation, safety is given overriding importance. The safety design principles of PHWRs are based on defence-in-depth approach, physical and functional separation between process and safety systems and also among various safety systems, redundancy to meet single failure criteria and postulation of a number of design basis events for which the plant must be designed. Apart from engineered safety systems, PHWRs have inherent characteristics which contribute to safety. In siting of a NPP, it is required to ensure that the given site does not pose undue radiological hazard to public and the environment both during normal operation as well as during and following an accident condition. For this purpose, all site related external events, both natural and man induced, are assessed for their effect on the plant and are considered as part of the design basis. Possible radiological impact of the NPP on environment and surrounding population is assessed and ensured to be within acceptable limits. During construction phase, it is essential that the NPP be built in accordance with design intent and with required quality of workmanship to ensure that the NPP will remain safe during all states of operation. This is achieved through careful execution and QA activities encompassing all aspects of component fabrication at manufacturer works, civil construction, site erection, assembly, and commissioning. Future trends in nuclear safety will continue to be based on existing principles which have proved to be sound. These will be further strengthened by features such as increasing use of passive means of performing safety functions and a more explicit treatment of severe accidents. (author)

  5. ATLAS Forward Proton (AFP) time-of-flight (ToF) detector: construction & existing experiences

    CERN Document Server

    Sykora, Tomas; The ATLAS collaboration

    2018-01-01

    In 2017 the ATLAS collaboration successfully completed the installation of the ATLAS Forward Proton (AFP) detector to measure diffractive protons leaving under very small angles (hundreds of micro radians) the ATLAS proton-proton interaction point. The AFP tags and measures forward protons scattered in single diffraction or hard central diffraction, where two protons are emitted and a central system is created. In addition, the AFP has a potential to measure two-photon exchange processes, and to be sensitive to eventual anomalous quartic couplings of Vector Bosons: γγW+W−, γγZZ, and γγγγ. Such measurements at high luminosities will be possible only due the combination of high resolution tracking (semi-edgeless 3D Silicon pixel) detectors and ultra-high precision ToF (Quartz-Cherenkov) detectors at both sides of the ATLAS detector. The ToF detector construction and experiences with its operation represent the subject of the talk.

  6. Construction and test of sMDT chambers for the ATLAS muon spectrometer

    Energy Technology Data Exchange (ETDEWEB)

    Takasugi, Eric; Schmidt-Sommerfeld, Korbinian; Kortner, Oliver; Kroha, Hubert [Max-Planck-Institut fuer Physik, Muenchen (Germany)

    2016-07-01

    In the ATLAS muon spectrometer, Monitored Drift Tube chambers (MDTs) are used for precise tracking measurements. In order to increase the geometric acceptance and rate capability, new chambers have been designed and are under construction to be installed in ATLAS during the winter shutdown of 2016/17 of the LHC. The new chambers have a drift tube diameter of 15 mm (compared to 30 mm of the other MDTs) and are therefore called sMDT chambers. This presentation reports on the progress of chamber construction and on the results of quality assurance tests.

  7. The ATLAS Liquid Argon Electromagnetic Calorimeter Construction, commissioning and elected test beam results

    CERN Document Server

    Hervás, L

    2004-01-01

    The construction of the ATLAS Liquid Argon Electromagnetic Calorimeter has been completed and commissioning is in progress to prepare the cryostats for lowering into the ATLAS pit. After a brief description of the detector, its construction and readout electronics, this paper summarizes results of quality checks (electrical, connectivity) carried out during the integration of the calorimeter wheels into the cryostats. We present also selected results of its performance, such as linearity, energy resolution, timing resolution, uniformity of the energy response, obtained in beam tests with several series modules. 16 Refs.

  8. A dynamic system for ATLAS software installation on OSG grid sites

    International Nuclear Information System (INIS)

    Zhao, X; Maeno, T; Wenaus, T; Leuhring, F; Youssef, S; Brunelle, J; De Salvo, A; Thompson, A S

    2010-01-01

    A dynamic and reliable system for installing the ATLAS software releases on Grid sites is crucial to guarantee the timely and smooth start of ATLAS production and reduce its failure rate. In this paper, we discuss the issues encountered in the previous software installation system, and introduce the new approach, which is built upon the new development in the areas of the ATLAS workload management system (PanDA), and software package management system (pacman). It is also designed to integrate with the EGEE ATLAS software installation framework. In the new system, ATLAS software releases are packaged as pacball, a uniquely identifiable and reproducible self-installing data file. The distribution of pacballs to remote sites is managed by ATLAS data management system (DQ2) and PanDA server. The installation on remote sites is automatically triggered by the PanDA pilot jobs. The installation job payload connects to a central ATLAS software installation portal, making the information of installation status easily accessible across OSG and EGEE Grids. The issues encountered in running the new system in production, and our future plan for improvement, will also be discussed.

  9. Turbidity monitoring equipment and methodology evaluation at MDOT construction sites.

    Science.gov (United States)

    2014-12-01

    State Study 261 is a continuation of State study 225, "Turbidity Monitoring at Select : MDOT Construction Sites", which was successful in establishing baseline stream data : at several active construction sites. State Study 261 focused on the equipme...

  10. Construction of monitored drift tube chambers for ATLAS end-cap muon spectrometer at IHEP (Protvino)

    CERN Document Server

    Bensinger, J; Borisov, A; Fakhrutdinov, R M; Goryatchev, S; Goryachev, V N; Gushchin, V; Hashemi, K S; Kojine, A; Kononov, A I; Larionov, A; Paramoshkina, E; Pilaev, A; Skvorodnev, N; Tchougouev, A; Wellenstein, H

    2002-01-01

    Trapezoidal-shaped Monitored Drift Tube (MDT) chambers will be used in end-caps of ATLAS muon spectrometer. Design and construction technology of such chambers in IHEP (Protvino) is presented. X-ray tomography results confirm desirable 20 mum precision of wire location in the chamber.

  11. Design, construction and quality control of resistive-Micromegas anode boards for the ATLAS experiment

    Science.gov (United States)

    Kuger, F.; Iengo, P.

    2018-02-01

    For the upcoming upgrade of the forward muon stations of the ATLAS detector, 1280m2 of Micromegas chambers have to be constructed. The industrialization of anode board production is an essential precondition. Design and construction methods of these boards have been optimized towards mass production. In parallel quality control procedures have been developed and established. The first set of large size Micromegas anode boards has finally been produced in industries and demonstrates the feasibility of the project on full-scale.

  12. Improving ATLAS grid site reliability with functional tests using HammerCloud

    CERN Document Server

    Legger, F; The ATLAS collaboration

    2012-01-01

    With the exponential growth of LHC (Large Hadron Collider) data in 2011, and more coming in 2012, distributed computing has become the established way to analyse collider data. The ATLAS grid infrastructure includes almost 100 sites worldwide, ranging from large national computing centers to smaller university clusters. These facilities are used for data reconstruction and simulation, which are centrally managed by the ATLAS production system, and for distributed user analysis. To ensure the smooth operation of such a complex system, regular tests of all sites are necessary to validate the site capability of successfully executing user and production jobs. We report on the development, optimization and results of an automated functional testing suite using the HammerCloud framework. Functional tests are short light-weight applications covering typical user analysis and production schemes, which are periodically submitted to all ATLAS grid sites. Results from those tests are collected and used to evaluate site...

  13. ATLAS pixel IBL modules construction experience and developments for future upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Gaudiello, A.

    2015-10-01

    The first upgrade of the ATLAS Pixel Detector is the Insertable B-Layer (IBL), installed in May 2014 in the core of ATLAS. Two different silicon sensor technologies, planar n-in-n and 3D, are used. Sensors are connected with the new generation 130 nm IBM CMOS FE-I4 read-out chip via solder bump-bonds. Production quality control tests were set up to verify and rate the performance of the modules before integration into staves. An overview of module design and construction, the quality control results and production yield will be discussed, as well as future developments foreseen for future detector upgrades.

  14. ATLAS endcap liquid argon calorimeters. Description and construction of the cryostats

    Energy Technology Data Exchange (ETDEWEB)

    Mace, Guy; Prat, Serge; Veillet, Jean-Jacques [Laboratoire de l' Accelerateur Lineaire IN2P3-CNRS et Universite de Paris-Sud 11, BP 34, F-91898 Orsay Cedex (France)

    2006-05-15

    All forward calorimeters of the ATLAS detector use the same detection technique, energy loss in passive plates, followed by ionisation and charge detection in liquid argon. They are therefore all grouped in the same vessel which must basically support and keep in place the heavy plates and the detection electrodes and maintain liquid argon at cold and stable temperature. Taking into account all the constraints as detailed below, and the overall detector size, 5 meter diameter by 3 meter length this was quite a challenge. The design, construction and tests of these two cryostats, up to their delivery at CERN, are described in this document. These two cryostats are a joint 'in kind' contribution to the Atlas experiment of LAL (Orsay), Max Planck Institute (Muenchen) and Wuppertal University (Wuppertal) and have been designed and built under the responsibility of LAL (Orsay) with contributions of the technical groups of the above institutions and of ATLAS-CERN. (authors)

  15. ATLAS endcap liquid argon calorimeters. Description and construction of the cryostats

    International Nuclear Information System (INIS)

    Mace, Guy; Prat, Serge; Veillet, Jean-Jacques

    2006-05-01

    All forward calorimeters of the ATLAS detector use the same detection technique, energy loss in passive plates, followed by ionisation and charge detection in liquid argon. They are therefore all grouped in the same vessel which must basically support and keep in place the heavy plates and the detection electrodes and maintain liquid argon at cold and stable temperature. Taking into account all the constraints as detailed below, and the overall detector size, 5 meter diameter by 3 meter length this was quite a challenge. The design, construction and tests of these two cryostats, up to their delivery at CERN, are described in this document. These two cryostats are a joint 'in kind' contribution to the Atlas experiment of LAL (Orsay), Max Planck Institute (Muenchen) and Wuppertal University (Wuppertal) and have been designed and built under the responsibility of LAL (Orsay) with contributions of the technical groups of the above institutions and of ATLAS-CERN. (authors)

  16. Improving ATLAS grid site reliability with functional tests using HammerCloud

    CERN Document Server

    Legger, F; The ATLAS collaboration; Medrano Llamas, R; Sciacca, G; Van der Ster, D C

    2012-01-01

    With the exponential growth of LHC (Large Hadron Collider) data in 2011, and more coming in 2012, distributed computing has become the established way to analyse collider data. The ATLAS grid infrastructure includes more than 80 sites worldwide, ranging from large national computing centers to smaller university clusters. These facilities are used for data reconstruction and simulation, which are centrally managed by the ATLAS production system, and for distributed user analysis. To ensure the smooth operation of such a complex system, regular tests of all sites are necessary to validate the site capability of successfully executing user and production jobs. We report on the development, optimization and results of an automated functional testing suite using the HammerCloud framework. Functional tests are short light-weight applications covering typical user analysis and production schemes, which are periodically submitted to all ATLAS grid sites. Results from those tests are collected and used to evaluate si...

  17. Wind Atlas for South Africa (WASA) Station and Site Description Report

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling; Hansen, Jens Carsten; Kelly, Mark C.

    As part of the “Wind Atlas for South Africa” project, site inspection trips were carried out by the Council for Scientific and Industrial Research (CSIR) and Risø DTU in April and June of 2011. A total of 10 sites featuring instrumented 60-m masts were visited; the present report summarises...

  18. ATLAS

    Data.gov (United States)

    Federal Laboratory Consortium — ATLAS is a particle physics experiment at the Large Hadron Collider at CERN, the European Organization for Nuclear Research. Scientists from Brookhaven have played...

  19. Construction of a consistent high-definition spatio-temporal atlas of the developing brain using adaptive kernel regression.

    Science.gov (United States)

    Serag, Ahmed; Aljabar, Paul; Ball, Gareth; Counsell, Serena J; Boardman, James P; Rutherford, Mary A; Edwards, A David; Hajnal, Joseph V; Rueckert, Daniel

    2012-02-01

    Medical imaging has shown that, during early development, the brain undergoes more changes in size, shape and appearance than at any other time in life. A better understanding of brain development requires a spatio-temporal atlas that characterizes the dynamic changes during this period. In this paper we present an approach for constructing a 4D atlas of the developing brain, between 28 and 44 weeks post-menstrual age at time of scan, using T1 and T2 weighted MR images from 204 premature neonates. The method used for the creation of the average 4D atlas utilizes non-rigid registration between all pairs of images to eliminate bias in the atlas toward any of the original images. In addition, kernel regression is used to produce age-dependent anatomical templates. A novelty in our approach is the use of a time-varying kernel width, to overcome the variations in the distribution of subjects at different ages. This leads to an atlas that retains a consistent level of detail at every time-point. Comparisons between the resulting atlas and atlases constructed using affine and non-rigid registration are presented. The resulting 4D atlas has greater anatomic definition than currently available 4D atlases created using various affine and non-rigid registration approaches, an important factor in improving registrations between the atlas and individual subjects. Also, the resulting 4D atlas can serve as a good representative of the population of interest as it reflects both global and local changes. The atlas is publicly available at www.brain-development.org. Copyright © 2011 Elsevier Inc. All rights reserved.

  20. 29 CFR 1926.752 - Site layout, site-specific erection plan and construction sequence.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Site layout, site-specific erection plan and construction... Steel Erection § 1926.752 Site layout, site-specific erection plan and construction sequence. (a... strength or sufficient strength to support the loads imposed during steel erection. (c) Site layout. The...

  1. Construction of the ATLAS end cap electromagnetic calorimeter and study of its performances; Construction du bouchon du calorimetre electromagnetique d'ATLAS et etudes de ses performances

    Energy Technology Data Exchange (ETDEWEB)

    Barrillon, P

    2002-09-01

    ATLAS is one of the four experiments which will take place at the LHC, the CERN future protons collider. This accelerator, which should start in 2007, will allow to continue the studies carried out by its predecessors, as the standard model Higgs boson and new physics searches. The very high luminosity -10 fb{sup -1} during the first three functioning years, then 100 fb{sup -1}- and the 14 TeV in the frame center will ease these studies. The Centre de Physique des Particules de Marseille took part in the ATLAS collaboration, taking in charge half of the End-cap electromagnetic calorimeter modules construction. The description of this sub-detector and the construction steps, in particular the electrical tests which allow the stacking validation, are presented in this document. These tests results, obtained for the live first production modules, are analysed. The pre-series module (module 0) performances, obtained with beam tests performed at CERN in 1999, are also presented. The detector uniformity studies have allowed to perform important improvements on the calorimeter components. A 0.6% global constant term has been determined in the End-cap internal region (wheel). (author)

  2. BIM for Construction Site Logistics Management

    Directory of Open Access Journals (Sweden)

    K. Whitlock

    2018-01-01

    Full Text Available Emerging Building Information Modelling (BIM has been hailed as a revolutionary technology and information management process that facilitates collaboration and more efficient design and construction processes through innovative 3D modelling software, open access to information and multidisciplinary integration. The deadline of compliance to BIM level 2 on all public sector centrally procured construction projects has expired leaving many construction firms anxious to adopt BIM. Most common documented applications of BIM have been in the areas of architectural and structural design, quantity surveying, construction project management, and sustainability with very limited peer-reviewed studies on construction logistics management. The aim of this study is to investigate how BIM can be applied to construction logistics management. This study adopts a desk-top approach, with articles sources from renowned scientific databases such as ScienceDirect, Google Scholar and Emerald. The study culminated in the identification of benefits and barriers of adopting BIM for construction logistics management. Given only a desk-top approach has been used, the recommendation for future study is to build on this to conduct an empirical study using both qualitative and quantitative data. This will provide an in-depth understanding of the use of BIM for construction logistics management and open opportunities for further research.

  3. Construction Site Workers’ Awareness on Using Safety Equipment: Case Study

    OpenAIRE

    Ulang N. Md; Salim N. S.; Baharum F.; Agus Salim N.A.

    2014-01-01

    Construction sector is an important sector and contributed significantly to national development. However, this sector poses higher risk to accident. This is due to fact that construction site can be considered as a dangerous zone to workers and to the public. Due to the variety of cases occurs on site, the contractor will usually have to pay the cost related to accidents in the form of higher insurance premium. Despite various measures, accidents still occur at construction sites. Personal P...

  4. Construction plant requirements for nuclear sites

    International Nuclear Information System (INIS)

    Tatum, C.B.; Harris, J.A.

    1981-01-01

    Planning and developing the temporary construction plant facilities for a nuclear project is equivalent to providing utility services for a small city. Provision of adequate facilities is an important factor in the productivity of both the manual and non-manual work force. This paper summarizes construction facility requirements for a two unit (1300 MWe each) nuclear project. Civil, mechanical and electrical facilities are described, including design, installation and operation. Assignment of responsibility for specific work tasks regarding the construction plant is also discussed. In presenting this data, the authors seek to transfer experience and assist in the provision of adequate facilities on future projects

  5. Construction and performance of a prototype detector for the ATLAS new small wheel

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Tai-Hua; Schott, Matthias; Valderanis, Chrysostomos; Duedder, Andreas [Johannes Gutenberg-Universitaet Mainz (Germany); Collaboration: ATLAS-Collaboration

    2015-07-01

    One of the upgrades of ATLAS detector for its phase II of operation is the replacement of the inner part of end cap muon spectrometer with resistive micromegas detectors. In this talk we discuss the very first working prototype, a quadruplets detector with an area of 0.5 m{sup 2} per plane in a trapezoid shape. The detailed construction of the prototype which includes the drift and readout layers gluing, gas flowing system mounting and etc. ls presented. The prototype was tested at the Mainz Microtron and with cosmic rays and results are presented. Finally we report on its installation of the prototype to the ATLAS cavern and on the plans for future measurements with it.

  6. Studies for site preparation for ITER construction

    International Nuclear Information System (INIS)

    Fardeau, A.; Blanc, F.; Cardettini, J.D.; Mandine, J.R.; Guerin, R.; Patisson, L.; Bergegere, P.; Santagiustina, A.; Garin, P.

    2004-01-01

    The implantation of a nuclear facility such as ITER (about 20 buildings on 40 ha) requires many preparatory studies, particularly with respect to: Underground characteristics; Topography, layout; Deforestation, excavations; Networks, fences and roads; Impact of seismic hazard on design. This paper presents the main results of these studies, carried out within the European ITER Site Studies framework. A dedicated paper in the conference deals with the transport studies. To choose the site for ITER implantation, detailed geological, hydrogeological and geophysical investigations have been carried out. Taking into account the meteorological data (particularly the main wind direction), topography, access, electrical supply, fluids needs and constraints (gravity systems), buildings and roads have been implemented. (authors)

  7. Improving ATLAS grid site reliability with functional tests using HammerCloud

    Science.gov (United States)

    Elmsheuser, Johannes; Legger, Federica; Medrano Llamas, Ramon; Sciacca, Gianfranco; van der Ster, Dan

    2012-12-01

    With the exponential growth of LHC (Large Hadron Collider) data in 2011, and more coming in 2012, distributed computing has become the established way to analyse collider data. The ATLAS grid infrastructure includes almost 100 sites worldwide, ranging from large national computing centers to smaller university clusters. These facilities are used for data reconstruction and simulation, which are centrally managed by the ATLAS production system, and for distributed user analysis. To ensure the smooth operation of such a complex system, regular tests of all sites are necessary to validate the site capability of successfully executing user and production jobs. We report on the development, optimization and results of an automated functional testing suite using the HammerCloud framework. Functional tests are short lightweight applications covering typical user analysis and production schemes, which are periodically submitted to all ATLAS grid sites. Results from those tests are collected and used to evaluate site performances. Sites that fail or are unable to run the tests are automatically excluded from the PanDA brokerage system, therefore avoiding user or production jobs to be sent to problematic sites.

  8. Management of construction safety at KKNPP site

    International Nuclear Information System (INIS)

    Khare, P.K.

    2016-01-01

    Construction is considered as one of the most hazardous activities owing to the number of accidents and injuries. At KKNPP, management of industrial safety has been envisaged since the preliminary stage of construction planning, including design aspects. The governing principles of safety management are evolved from the Factories Act, 1948, the Atomic Energy(Factories) Rules, 1996, AERB safety guidelines on Control of works (2011) and Corporate HSE policy of NPCIL (2014). Numerous risk assessment and hazard control measures are adopted consistently to ensure a safe work environment during the construction, which includes Job Hazard Analysis, work permit through Computerized Maintenance Management System, safety procedures, exclusive safety training facility for the contractor's workmen, safety motivational measures, safety surveillance and reporting through Safety Related Deficiencies Management System. Assessment of efficacy of safety management system is continuously done through safety audits and observations are being circulated and discussed in committee meetings. Fire safety is also being taken care of since inception of project work. Well-equipped fire station with trained fire fighters was made available since the beginning as per AERB safety standard on fire protection system for Nuclear facilities. Fire prevention measures specific to the work are implemented during all activities. (author)

  9. Quality assurance during site construction. Pt. 4

    International Nuclear Information System (INIS)

    Potrz, R.; Dilling, H.

    1980-01-01

    Quality control during the assembly of an pressure water reactor containment: 1.) Fundamental principles of the quality control: short explanation to the specification and job instruction. 2.) Quality control during the assembly: welding control, non destructive material test. 3.) Quality deviations: explanation of an repair-plan. 4.) Documentation: join together the workshop- and site documentation. (orig.)

  10. Stimulation sites in the subthalamic nucleus projected onto a mean 3-D atlas of the thalamus and basal ganglia.

    Science.gov (United States)

    Sarnthein, Johannes; Péus, Dominik; Baumann-Vogel, Heide; Baumann, Christian R; Sürücü, Oguzkan

    2013-09-01

    In patients with severe forms of Parkinson's disease (PD), deep brain stimulation (DBS) commonly targets the subthalamic nucleus (STN). Recently, the mean 3-D Morel-Atlas of the basal ganglia and the thalamus was introduced. It combines information contained in histological data from ten post-mortem brains. We were interested whether the Morel-Atlas is applicable for the visualization of stimulation sites. In a consecutive PD patient series, we documented preoperative MRI planning, intraoperative target adjustment based on electrophysiological and neurological testing, and perioperative CT target reconstruction. The localization of the DBS electrodes and the optimal stimulation sites were projected onto the Morel-Atlas. We included 20 patients (median age 62 years). The active contact had mean coordinates Xlat = ±12.1 mm, Yap = -1.8 mm, Zvert = -3.2 mm. There was a significant difference between the initially planned site and the coordinates of the postoperative active contact site (median 2.2 mm). The stimulation site was, on average, more anterior and more dorsal. The electrode contact used for optimal stimulation was found within the STN of the atlas in 38/40 (95 %) of implantations. The cluster of stimulation sites in individual patients-as deduced from preoperative MR, intraoperative electrophysiology and neurological testing-showed a high degree of congruence with the atlas. The mean 3D Morel Atlas is thus a useful tool for postoperative target visualization. This represents the first clinical evaluation of the recently created atlas.

  11. The ATLAS Liquid Argon Electromagnetic EndCap Calorimeter Construction and tests

    CERN Document Server

    Rodier, S; Del Peso, J

    2003-01-01

    This thesis has been carried out within the ATLAS collaboration. ATLAS is one of the two multipurpose experiments approved for data taking at the Large Hadron Collider (LHC) at CERN. The main goals of this experiment are, to find the Higgs boson, the missing piece in the otherwise so succesful Standard Model of Particle Physics, and to look for physics beyond the Standard Model up to a scale of 1TeV. For this purpose, electromagnetic (EM) calorimetry play a key role. The ATLAS Collaboration has chosen a Liquid Argon (LAr) option with lead as passive material. The liquid Argon Calorimeter is divided into two main subdetectors, the barrel and the end caps (EC). The design and construction of the LAr EM EC calorimeter is the responsability of the groups at Centre de Physique de Marseille (CPPM) and the Universidad Autonoma de Madrid (UAM)following the guideline developed by the research and development working, group 3 for LHC detectors (RD3). The sharing of responsabilities is such that CPPM provides spacers an...

  12. Quantifying Construction Site Sediment Discharge Risk and Treatment Potential

    Science.gov (United States)

    Ferrell, L.; Beighley, R. E.

    2006-12-01

    Dealing with soil erosion and sediment transport can be a significant challenge during the construction process due to the potentially large spatial and temporal extent and conditions of bare soils. Best Management Practices (BMP) are commonly used to eliminate or reduce offsite discharge of sediment. However, few efforts have investigated the time varying risk of sediment discharge from construction sites, which often have dynamic soil conditions and the potential for less than optimal BMP installations. The goal of this research is to improve the design, implementation and effectiveness of sediment and erosion control at construction sites using site specific, temporal distributions of sediment discharge risk. Sediment risk is determined from individual factors leading to sediment expert, such as rainfall frequency, the adequacy of BMP installations, and the extent and duration of bare soil conditions. This research specifically focuses on quantifying: (a) the effectiveness of temporary sediment and control erosion control BMPs in preventing, containing, and/or treating construction site sediment discharge at varying levels of "proper" installation, and (b) sediment discharge potential from construction sites during different phases of construction, (ex., disturbed earth operations). BMPs are evaluated at selected construction sites in southern California and at the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with soil depths up to 1 meter, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, potential less than optimal installations, and no treatment conditions. Soil conditions are also varied to represent site conditions during different phases of construction (i.e., loose lifts

  13. Construction and test of a full-scale prototype of an ATLAS muon spectrometer tracking chamber

    International Nuclear Information System (INIS)

    Biscossa, A.; Cambiaghi, M.; Conta, C.; Ferrari, R.; Fraternali, M.; Freddi, A.; Iuvino, G.; Lanza, A.; Livan, M.; Negri, A.; Polesello, G.; Rimoldi, A.; Vercellati, F.; Vercesi, V.; Bagnaia, P.; Bini, C.; Capradossi, G.; Ciapetti, G.; Creti, P.; De Zorzi, G.; Iannone, M.; Lacava, F.; Mattei, A.; Nisati, L.; Oberson, P.; Pontecorvo, L.; Rosati, S.; Veneziano, S.; Zullo, A.; Daly, C.H.; Davisson, R.; Guldenmann, H.; Lubatti, H.J.; Zhao, T.

    1999-01-01

    We have built a full scale prototype of the precision tracking chambers (Monitored Drift Tubes, MDT) for the muon spectrometer of the Atlas Experiment at the LHC collider. This article describes in detail the procedures used in constructing the drift tubes and in assembling the chamber. It presents data showing that the required mechanical precision has been achieved as well as test beam results displaying the over all chamber performance. The article presents data demonstrating the derivation of the space-time relation of the drift tubes by the autocalibration procedure using real data from the tracks crossing the chamber. Autocalibration is the procedure which must be used during run time

  14. Progress in the construction of the B0 model of the ATLAS Barrel Toroid magnet

    CERN Document Server

    Acerbi, E; Ambrosio, G; Baccaglioni, G; Broggi, F; Rossi, L; Sorbi, M; Volpini, G

    2000-01-01

    The ATLAS Barrel Toroid air-core magnet (BT) will be composed by 8 superconducting coils, each one 25 m long and 5 m wide. In order to validate the technologies and manufacturing processes, a smaller model (9 m long) of one BT coil, named B0, is now under construction. This paper presents a general overview of the B0 project status, with special regard to the components for which the LASA Lab. is responsible: (a) the aluminium-clad NbTi conductor; (b) the double coils winding and impregnation; (c) the components of the cryostat (vacuum chamber, thermal shield and suspension rod). (6 refs).

  15. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  16. Safety leadership: application in construction site.

    Science.gov (United States)

    Cooper, Dominic

    2010-01-01

    The extant safety literature suggests that managerial Safety Leadership is vital to the success and maintenance of a behavioral safety process. The current paper explores the role of Managerial Safety Leadership behaviors in the success of a behavioral safety intervention in the Middle-East with 47,000 workers from multiple nationalities employed by fourteen sub-contractors and one main contractor. A quasi-experimental repeating ABABAB, within groups design was used. Measurement focused on managerial Safety Leadership and employee safety behaviors as well as Corrective Actions. Data was collected over 104 weeks. During this time, results show safety behavior improved by 30 percentage points from an average of 65% during baseline to an average of 95%. The site achieved 121 million man-hours free of lost-time injuries on the longest run. Stepwise multiple regression analyses indicated 86% of the variation in employee safety behavior was associated with senior, middle and front-line manager's Safety Leadership behaviors and the Corrective Action Rate. Approximately 38% of the variation in the Total Recordable Incident Rate (TRIR) was associated with the Observation rate, Corrective Action Rate and Observers Records of managerial safety leaders (Visible Ongoing Support). The results strongly suggest manager's Safety Leadership influences the success of Behavioral Safety processes.

  17. Survey dataset on occupational hazards on construction sites

    Directory of Open Access Journals (Sweden)

    Patience F. Tunji-Olayeni

    2018-06-01

    Full Text Available The construction site provides an unfriendly working conditions, exposing workers to one of the harshest environments at a workplace. In this dataset, a structured questionnaire was design directed to thirty-five (35 craftsmen selected through a purposive sampling technique on various construction sites in one of the most populous cities in sub-Saharan Africa. The set of descriptive statistics is presented with tables, stacked bar chats and pie charts. Common occupational health conditions affecting the cardiovascular, respiratory and musculoskeletal systems of craftsmen on construction sites were identified. The effects of occupational health hazards on craftsmen and on construction project performance can be determined when the data is analyzed. Moreover, contractors’ commitment to occupational health and safety (OHS can be obtained from the analysis of the survey data. Keywords: Accidents, Construction industry, Craftsmen, Health, Occupational hazards

  18. Pattern of accidents in building construction sites in Obio Akpor ...

    African Journals Online (AJOL)

    Background: Building construction workers are engaged in a dangerous job, exposing them ... The leading cause building site accidents include falls from unsafe working ... Data collected in Excel spread sheet were analyzed and presented in ...

  19. ATLAS

    CERN Multimedia

    Akhnazarov, V; Canepa, A; Bremer, J; Burckhart, H; Cattai, A; Voss, R; Hervas, L; Kaplon, J; Nessi, M; Werner, P; Ten kate, H; Tyrvainen, H; Vandelli, W; Krasznahorkay, A; Gray, H; Alvarez gonzalez, B; Eifert, T F; Rolando, G; Oide, H; Barak, L; Glatzer, J; Backhaus, M; Schaefer, D M; Maciejewski, J P; Milic, A; Jin, S; Von torne, E; Limbach, C; Medinnis, M J; Gregor, I; Levonian, S; Schmitt, S; Waananen, A; Monnier, E; Muanza, S G; Pralavorio, P; Talby, M; Tiouchichine, E; Tocut, V M; Rybkin, G; Wang, S; Lacour, D; Laforge, B; Ocariz, J H; Bertoli, W; Malaescu, B; Sbarra, C; Yamamoto, A; Sasaki, O; Koriki, T; Hara, K; Da silva gomes, A; Carvalho maneira, J; Marcalo da palma, A; Chekulaev, S; Tikhomirov, V; Snesarev, A; Buzykaev, A; Maslennikov, A; Peleganchuk, S; Sukharev, A; Kaplan, B E; Swiatlowski, M J; Nef, P D; Schnoor, U; Oakham, G F; Ueno, R; Orr, R S; Abouzeid, O; Haug, S; Peng, H; Kus, V; Vitek, M; Temming, K K; Dang, N P; Meier, K; Schultz-coulon, H; Geisler, M P; Sander, H; Schaefer, U; Ellinghaus, F; Rieke, S; Nussbaumer, A; Liu, Y; Richter, R; Kortner, S; Fernandez-bosman, M; Ullan comes, M; Espinal curull, J; Chiriotti alvarez, S; Caubet serrabou, M; Valladolid gallego, E; Kaci, M; Carrasco vela, N; Lancon, E C; Besson, N E; Gautard, V; Bracinik, J; Bartsch, V C; Potter, C J; Lester, C G; Moeller, V A; Rosten, J; Crooks, D; Mathieson, K; Houston, S C; Wright, M; Jones, T W; Harris, O B; Byatt, T J; Dobson, E; Hodgson, P; Hodgkinson, M C; Dris, M; Karakostas, K; Ntekas, K; Oren, D; Duchovni, E; Etzion, E; Oren, Y; Ferrer, L M; Testa, M; Doria, A; Merola, L; Sekhniaidze, G; Giordano, R; Ricciardi, S; Milazzo, A; Falciano, S; De pedis, D; Dionisi, C; Veneziano, S; Cardarelli, R; Verzegnassi, C; Soualah, R; Ochi, A; Ohshima, T; Kishiki, S; Linde, F L; Vreeswijk, M; Werneke, P; Muijs, A; Vankov, P H; Jansweijer, P P M; Dale, O; Lund, E; Bruckman de renstrom, P; Dabrowski, W; Adamek, J D; Wolters, H; Micu, L; Pantea, D; Tudorache, V; Mjoernmark, J; Klimek, P J; Ferrari, A; Abdinov, O; Akhoundov, A; Hashimov, R; Shelkov, G; Khubua, J; Ladygin, E; Lazarev, A; Glagolev, V; Dedovich, D; Lykasov, G; Zhemchugov, A; Zolnikov, Y; Ryabenko, M; Sivoklokov, S; Vasilyev, I; Shalimov, A; Lobanov, M; Paramoshkina, E; Mosidze, M; Bingul, A; Nodulman, L J; Guarino, V J; Yoshida, R; Drake, G R; Calafiura, P; Haber, C; Quarrie, D R; Alonso, J R; Anderson, C; Evans, H; Lammers, S W; Baubock, M; Anderson, K; Petti, R; Suhr, C A; Linnemann, J T; Richards, R A; Tollefson, K A; Holzbauer, J L; Stoker, D P; Pier, S; Nelson, A J; Isakov, V; Martin, A J; Adelman, J A; Paganini, M; Gutierrez, P; Snow, J M; Pearson, B L; Cleland, W E; Savinov, V; Wong, W; Goodson, J J; Li, H; Lacey, R A; Gordeev, A; Gordon, H; Lanni, F; Nevski, P; Rescia, S; Kierstead, J A; Liu, Z; Yu, W W H; Bensinger, J; Hashemi, K S; Bogavac, D; Cindro, V; Hoeferkamp, M R; Coelli, S; Iodice, M; Piegaia, R N; Alonso, F; Wahlberg, H P; Barberio, E L; Limosani, A; Rodd, N L; Jennens, D T; Hill, E C; Pospisil, S; Smolek, K; Schaile, D A; Rauscher, F G; Adomeit, S; Mattig, P M; Wahlen, H; Volkmer, F; Calvente lopez, S; Sanchis peris, E J; Pallin, D; Podlyski, F; Says, L; Boumediene, D E; Scott, W; Phillips, P W; Greenall, A; Turner, P; Gwilliam, C B; Kluge, T; Wrona, B; Sellers, G J; Millward, G; Adragna, P; Hartin, A; Alpigiani, C; Piccaro, E; Bret cano, M; Hughes jones, R E; Mercer, D; Oh, A; Chavda, V S; Carminati, L; Cavasinni, V; Fedin, O; Patrichev, S; Ryabov, Y; Nesterov, S; Grebenyuk, O; Sasso, J; Mahmood, H; Polsdofer, E; Dai, T; Ferretti, C; Liu, H; Hegazy, K H; Benjamin, D P; Zobernig, G; Ban, J; Brooijmans, G H; Keener, P; Williams, H H; Le geyt, B C; Hines, E J; Fadeyev, V; Schumm, B A; Law, A T; Kuhl, A D; Neubauer, M S; Shang, R; Gagliardi, G; Calabro, D; Conta, C; Zinna, M; Jones, G; Li, J; Stradling, A R; Hadavand, H K; Mcguigan, P; Chiu, P; Baldelomar, E; Stroynowski, R A; Kehoe, R L; De groot, N; Timmermans, C; Lach-heb, F; Addy, T N; Nakano, I; Moreno lopez, D; Grosse-knetter, J; Tyson, B; Rude, G D; Tafirout, R; Benoit, P; Danielsson, H O; Elsing, M; Fassnacht, P; Froidevaux, D; Ganis, G; Gorini, B; Lasseur, C; Lehmann miotto, G; Kollar, D; Aleksa, M; Sfyrla, A; Duehrssen-debling, K; Fressard-batraneanu, S; Van der ster, D C; Bortolin, C; Schumacher, J; Mentink, M; Geich-gimbel, C; Yau wong, K H; Lafaye, R; Crepe-renaudin, S; Albrand, S; Hoffmann, D; Pangaud, P; Meessen, C; Hrivnac, J; Vernay, E; Perus, A; Henrot versille, S L; Le dortz, O; Derue, F; Piccinini, M; Polini, A; Terada, S; Arai, Y; Ikeno, M; Fujii, H; Nagano, K; Ukegawa, F; Aguilar saavedra, J A; Conde muino, P; Castro, N F; Eremin, V; Kopytine, M; Sulin, V; Tsukerman, I; Korol, A; Nemethy, P; Bartoldus, R; Glatte, A; Chelsky, S; Van nieuwkoop, J; Bellerive, A; Sinervo, J K; Battaglia, A; Barbier, G J; Pohl, M; Rosselet, L; Alexandre, G B; Prokoshin, F; Pezoa rivera, R A; Batkova, L; Kladiva, E; Stastny, J; Kubes, T; Vidlakova, Z; Esch, H; Homann, M; Herten, L G; Zimmermann, S U; Pfeifer, B; Stenzel, H; Andrei, G V; Wessels, M; Buescher, V; Kleinknecht, K; Fiedler, F M; Schroeder, C D; Fernandez, E; Mir martinez, L; Vorwerk, V; Bernabeu verdu, J; Salt, J; Civera navarrete, J V; Bernard, R; Berriaud, C P; Chevalier, L P; Hubbard, R; Schune, P; Nikolopoulos, K; Batley, J R; Brochu, F M; Phillips, A W; Teixeira-dias, P J; Rose, M B D; Buttar, C; Buckley, A G; Nurse, E L; Larner, A B; Boddy, C; Henderson, J; Costanzo, D; Tarem, S; Maccarrone, G; Laurelli, P F; Alviggi, M; Chiaramonte, R; Izzo, V; Palumbo, V; Fraternali, M; Crosetti, G; Marchese, F; Yamaguchi, Y; Hessey, N P; Mechnich, J M; Liebig, W; Kastanas, K A; Sjursen, T B; Zalieckas, J; Cameron, D G; Banka, P; Kowalewska, A B; Dwuznik, M; Mindur, B; Boldea, V; Hedberg, V; Smirnova, O; Sellden, B; Allahverdiyev, T; Gornushkin, Y; Koultchitski, I; Tokmenin, V; Chizhov, M; Gongadze, A; Khramov, E; Sadykov, R; Krasnoslobodtsev, I; Smirnova, L; Kramarenko, V; Minaenko, A; Zenin, O; Beddall, A J; Ozcan, E V; Hou, S; Wang, S; Moyse, E; Willocq, S; Chekanov, S; Le compte, T J; Love, J R; Ciocio, A; Hinchliffe, I; Tsulaia, V; Gomez, A; Luehring, F; Zieminska, D; Huth, J E; Gonski, J L; Oreglia, M; Tang, F; Shochet, M J; Costin, T; Mcleod, A; Uzunyan, S; Martin, S P; Pope, B G; Schwienhorst, R H; Brau, J E; Ptacek, E S; Milburn, R H; Sabancilar, E; Lauer, R; Saleem, M; Mohamed meera lebbai, M R; Lou, X; Reeves, K B; Rijssenbeek, M; Novakova, P N; Rahm, D; Steinberg, P A; Wenaus, T J; Paige, F; Ye, S; Kotcher, J R; Assamagan, K A; Oliveira damazio, D; Maeno, T; Henry, A; Dushkin, A; Costa, G; Meroni, C; Resconi, S; Lari, T; Biglietti, M; Lohse, T; Gonzalez silva, M L; Monticelli, F G; Saavedra, A F; Patel, N D; Ciodaro xavier, T; Asevedo nepomuceno, A; Lefebvre, M; Albert, J E; Kubik, P; Faltova, J; Turecek, D; Solc, J; Schaile, O; Ebke, J; Losel, P J; Zeitnitz, C; Sturm, P D; Barreiro alonso, F; Modesto alapont, P; Soret medel, J; Garzon alama, E J; Gee, C N; Mccubbin, N A; Sankey, D; Emeliyanov, D; Dewhurst, A L; Houlden, M A; Klein, M; Burdin, S; Lehan, A K; Eisenhandler, E; Lloyd, S; Traynor, D P; Ibbotson, M; Marshall, R; Pater, J; Freestone, J; Masik, J; Haughton, I; Manousakis katsikakis, A; Sampsonidis, D; Krepouri, A; Roda, C; Sarri, F; Fukunaga, C; Nadtochiy, A; Kara, S O; Timm, S; Alam, S M; Rashid, T; Goldfarb, S; Espahbodi, S; Marley, D E; Rau, A W; Dos anjos, A R; Haque, S; Grau, N C; Havener, L B; Thomson, E J; Newcomer, F M; Hansl-kozanecki, G; Deberg, H A; Takeshita, T; Goggi, V; Ennis, J S; Olness, F I; Kama, S; Ordonez sanz, G; Koetsveld, F; Elamri, M; Mansoor-ul-islam, S; Lemmer, B; Kawamura, G; Bindi, M; Schulte, S; Kugel, A; Kretz, M P; Kurchaninov, L; Blanchot, G; Chromek-burckhart, D; Di girolamo, B; Francis, D; Gianotti, F; Nordberg, M Y; Pernegger, H; Roe, S; Boyd, J; Wilkens, H G; Pauly, T; Fabre, C; Tricoli, A; Bertet, D; Ruiz martinez, M A; Arnaez, O L; Lenzi, B; Boveia, A J; Gillberg, D I; Davies, J M; Zimmermann, R; Uhlenbrock, M; Kraus, J K; Narayan, R T; John, A; Dam, M; Padilla aranda, C; Bellachia, F; Le flour chollet, F M; Jezequel, S; Dumont dayot, N; Fede, E; Mathieu, M; Gensolen, F D; Alio, L; Arnault, C; Bouchel, M; Ducorps, A; Kado, M M; Lounis, A; Zhang, Z P; De vivie de regie, J; Beau, T; Bruni, A; Bruni, G; Grafstrom, P; Romano, M; Lasagni manghi, F; Massa, L; Shaw, K; Ikegami, Y; Tsuno, S; Kawanishi, Y; Benincasa, G; Blagov, M; Fedorchuk, R; Shatalov, P; Romaniouk, A; Belotskiy, K; Timoshenko, S; Hooft van huysduynen, L; Lewis, G H; Wittgen, M M; Mader, W F; Rudolph, C J; Gumpert, C; Mamuzic, J; Rudolph, G; Schmid, P; Corriveau, F; Belanger-champagne, C; Yarkoni, S; Leroy, C; Koffas, T; Harack, B D; Weber, M S; Beck, H; Leger, A; Gonzalez sevilla, S; Zhu, Y; Gao, J; Zhang, X; Blazek, T; Rames, J; Sicho, P; Kouba, T; Sluka, T; Lysak, R; Ristic, B; Kompatscher, A E; Von radziewski, H; Groll, M; Meyer, C P; Oberlack, H; Stonjek, S M; Cortiana, G; Werthenbach, U; Ibragimov, I; Czirr, H S; Cavalli-sforza, M; Puigdengoles olive, C; Tallada crespi, P; Marti i garcia, S; Gonzalez de la hoz, S; Guyot, C; Meyer, J; Schoeffel, L O; Garvey, J; Hawkes, C; Hillier, S J; Staley, R J; Salvatore, P F; Santoyo castillo, I; Carter, J; Yusuff, I B; Barlow, N R; Berry, T S; Savage, G; Wraight, K G; Steele, G E; Hughes, G; Walder, J W; Love, P A; Crone, G J; Waugh, B M; Boeser, S; Sarkar, A M; Holmes, A; Massey, R; Pinder, A; Nicholson, R; Korolkova, E; Katsoufis, I; Maltezos, S; Tsipolitis, G; Leontsinis, S; Levinson, L J; Shoa, M; Abramowicz, H E; Bella, G; Gershon, A; Urkovsky, E; Taiblum, N; Gatti, C; Della pietra, M; Lanza, A; Negri, A; Flaminio, V; Lacava, F; Petrolo, E; Pontecorvo, L; Rosati, S; Zanello, L; Pasqualucci, E; Di ciaccio, A; Giordani, M; Yamazaki, Y; Jinno, T; Nomachi, M; De jong, P J; Ferrari, P; Homma, J; Van der graaf, H; Igonkina, O B; Stugu, B S; Buanes, T; Pedersen, M; Turala, M; Olszewski, A J; Koperny, S Z; Onofre, A; Castro nunes fiolhais, M; Alexa, C; Cuciuc, C M; Akesson, T P A; Hellman, S L; Milstead, D A; Bondyakov, A; Pushnova, V; Budagov, Y; Minashvili, I; Romanov, V; Sniatkov, V; Tskhadadze, E; Kalinovskaya, L; Shalyugin, A; Tavkhelidze, A; Rumyantsev, L; Karpov, S; Soloshenko, A; Vostrikov, A; Borissov, E; Solodkov, A; Vorob'ev, A; Sidorov, S; Malyaev, V; Lee, S; Grudzinski, J J; Virzi, J S; Vahsen, S E; Lys, J; Penwell, J W; Yan, Z; Bernard, C S; Barreiro guimaraes da costa, J P; Oliver, J N; Merritt, F S; Brubaker, E M; Kapliy, A; Kim, J; Zutshi, V V; Burghgrave, B O; Abolins, M A; Arabidze, G; Caughron, S A; Frey, R E; Radloff, P T; Schernau, M; Murillo garcia, R; Porter, R A; Mccormick, C A; Karn, P J; Sliwa, K J; Demers konezny, S M; Strauss, M G; Mueller, J A; Izen, J M; Klimentov, A; Lynn, D; Polychronakos, V; Radeka, V; Sondericker, J I I I; Bathe, S; Duffin, S; Chen, H; De castro faria salgado, P E; Kersevan, B P; Lacker, H M; Schulz, H; Kubota, T; Tan, K G; Yabsley, B D; Nunes de moura junior, N; Pinfold, J; Soluk, R A; Ouellette, E A; Leitner, R; Sykora, T; Solar, M; Sartisohn, G; Hirschbuehl, D; Huning, D; Fischer, J; Terron cuadrado, J; Glasman kuguel, C B; Lacasta llacer, C; Lopez-amengual, J; Calvet, D; Chevaleyre, J; Daudon, F; Montarou, G; Guicheney, C; Calvet, S P J; Tyndel, M; Dervan, P J; Maxfield, S J; Hayward, H S; Beck, G; Cox, B; Da via, C; Paschalias, P; Manolopoulou, M; Ragusa, F; Cimino, D; Ezzi, M; Fiuza de barros, N F; Yildiz, H; Ciftci, A K; Turkoz, S; Zain, S B; Tegenfeldt, F; Chapman, J W; Panikashvili, N; Bocci, A; Altheimer, A D; Martin, F F; Fratina, S; Jackson, B D; Grillo, A A; Seiden, A; Watts, G T; Mangiameli, S; Johns, K A; O'grady, F T; Errede, D R; Darbo, G; Ferretto parodi, A; Leahu, M C; Farbin, A; Ye, J; Liu, T; Wijnen, T A; Naito, D; Takashima, R; Sandoval usme, C E; Zinonos, Z; Moreno llacer, M; Agricola, J B; Mcgovern, S A; Sakurai, Y; Trigger, I M; Qing, D; De silva, A S; Butin, F; Dell'acqua, A; Hawkings, R J; Lamanna, M; Mapelli, L; Passardi, G; Rembser, C; Tremblet, L; Andreazza, W; Dobos, D A; Koblitz, B; Bianco, M; Dimitrov, G V; Schlenker, S; Armbruster, A J; Rammensee, M C; Romao rodrigues, L F; Peters, K; Pozo astigarraga, M E; Yi, Y; Desch, K K; Huegging, F G; Muller, K K; Stillings, J A; Schaetzel, S; Xella, S; Hansen, J D; Colas, J; Daguin, G; Wingerter, I; Ionescu, G D; Ledroit, F; Lucotte, A; Clement, B E; Stark, J; Clemens, J; Djama, F; Knoops, E; Coadou, Y; Vigeolas-choury, E; Feligioni, L; Iconomidou-fayard, L; Imbert, P; Schaffer, A C; Nikolic, I; Trincaz-duvoid, S; Warin, P; Camard, A F; Ridel, M; Pires, S; Giacobbe, B; Spighi, R; Villa, M; Negrini, M; Sato, K; Gavrilenko, I; Akimov, A; Khovanskiy, V; Talyshev, A; Voronkov, A; Hakobyan, H; Mallik, U; Shibata, A; Konoplich, R; Barklow, T L; Koi, T; Straessner, A; Stelzer, B; Robertson, S H; Vachon, B; Stoebe, M; Keyes, R A; Wang, K; Billoud, T R V; Strickland, V; Batygov, M; Krieger, P; Palacino caviedes, G D; Gay, C W; Jiang, Y; Han, L; Liu, M; Zenis, T; Lokajicek, M; Staroba, P; Tasevsky, M; Popule, J; Svatos, M; Seifert, F; Landgraf, U; Lai, S T; Schmitt, K H; Achenbach, R; Schuh, N; Kiesling, C; Macchiolo, A; Nisius, R; Schacht, P; Von der schmitt, J G; Kortner, O; Atlay, N B; Segura sole, E; Grinstein, S; Neissner, C; Bruckner, D M; Oliver garcia, E; Boonekamp, M; Perrin, P; Gaillot, F M; Wilson, J A; Thomas, J P; Thompson, P D; Palmer, J D; Falk, I E; Chavez barajas, C A; Sutton, M R; Robinson, D; Kaneti, S A; Wu, T; Robson, A; Shaw, C; Buzatu, A; Qin, G; Jones, R; Bouhova-thacker, E V; Viehhauser, G; Weidberg, A R; Gilbert, L; Johansson, P D C; Orphanides, M; Vlachos, S; Behar harpaz, S; Papish, O; Lellouch, D J H; Turgeman, D; Benary, O; La rotonda, L; Vena, R; Tarasio, A; Marzano, F; Gabrielli, A; Di stante, L; Liberti, B; Aielli, G; Oda, S; Nozaki, M; Takeda, H; Hayakawa, T; Miyazaki, K; Maeda, J; Sugimoto, T; Pettersson, N E; Bentvelsen, S; Groenstege, H L; Lipniacka, A; Vahabi, M; Ould-saada, F; Chwastowski, J J; Hajduk, Z; Kaczmarska, A; Olszowska, J B; Trzupek, A; Staszewski, R P; Palka, M; Constantinescu, S; Jarlskog, G; Lundberg, B L A; Pearce, M; Ellert, M F; Bannikov, A; Fechtchenko, A; Iambourenko, V; Kukhtin, V; Pozdniakov, V; Topilin, N; Vorozhtsov, S; Khassanov, A; Fliaguine, V; Kharchenko, D; Nikolaev, K; Kotenov, K; Kozhin, A; Zenin, A; Ivashin, A; Golubkov, D; Beddall, A; Su, D; Dallapiccola, C J; Cranshaw, J M; Price, L; Stanek, R W; Gieraltowski, G; Zhang, J; Gilchriese, M; Shapiro, M; Ahlen, S; Morii, M; Taylor, F E; Miller, R J; Phillips, F H; Torrence, E C; Wheeler, S J; Benedict, B H; Napier, A; Hamilton, S F; Petrescu, T A; Boyd, G R J; Jayasinghe, A L; Smith, J M; Mc carthy, R L; Adams, D L; Le vine, M J; Zhao, X; Patwa, A M; Baker, M; Kirsch, L; Krstic, J; Simic, L; Filipcic, A; Seidel, S C; Cantore-cavalli, D; Baroncelli, A; Kind, O M; Scarcella, M J; Maidantchik, C L L; Seixas, J; Balabram filho, L E; Vorobel, V; Spousta, M; Strachota, P; Vokac, P; Slavicek, T; Bergmann, B L; Biebel, O; Kersten, S; Srinivasan, M; Trefzger, T; Vazeille, F; Insa, C; Kirk, J; Middleton, R; Burke, S; Klein, U; Morris, J D; Ellis, K V; Millward, L R; Giokaris, N; Ioannou, P; Angelidakis, S; Bouzakis, K; Andreazza, A; Perini, L; Chtcheguelski, V; Spiridenkov, E; Yilmaz, M; Kaya, U; Ernst, J; Mahmood, A; Saland, J; Kutnink, T; Holler, J; Kagan, H P; Wang, C; Pan, Y; Xu, N; Ji, H; Willis, W J; Tuts, P M; Litke, A; Wilder, M; Rothberg, J; Twomey, M S; Rizatdinova, F; Loch, P; Rutherfoord, J P; Varnes, E W; Barberis, D; Osculati-becchi, B; Brandt, A G; Turvey, A J; Benchekroun, D; Nagasaka, Y; Thanakornworakij, T; Quadt, A; Nadal serrano, J; Magradze, E; Nackenhorst, O; Musheghyan, H; Kareem, M; Chytka, L; Perez codina, E; Stelzer-chilton, O; Brunel, B; Henriques correia, A M; Dittus, F; Hatch, M; Haug, F; Hauschild, M; Huhtinen, M; Lichard, P; Schuh-erhard, S; Spigo, G; Avolio, G; Tsarouchas, C; Ahmad, I; Backes, M P; Barisits, M; Gadatsch, S; Cerv, M; Sicoe, A D; Nattamai sekar, L P; Fazio, D; Shan, L; Sun, X; Gaycken, G F; Hemperek, T; Petersen, T C; Alonso diaz, A; Moynot, M; Werlen, M; Hryn'ova, T; Gallin-martel, M; Wu, M; Touchard, F; Menouni, M; Fougeron, D; Le guirriec, E; Chollet, J C; Veillet, J; Barrillon, P; Prat, S; Krasny, M W; Roos, L; Boudarham, G; Lefebvre, G; Boscherini, D; Valentinetti, S; Acharya, B S; Miglioranzi, S; Kanzaki, J; Unno, Y; Yasu, Y; Iwasaki, H; Tokushuku, K; Maio, A; Rodrigues fernandes, B J; Pinto figueiredo raimundo ribeiro, N M; Bot, A; Shmeleva, A; Zaidan, R; Djilkibaev, R; Mincer, A I; Salnikov, A; Aracena, I A; Schwartzman, A G; Silverstein, D J; Fulsom, B G; Anulli, F; Kuhn, D; White, M J; Vetterli, M J; Stockton, M C; Mantifel, R L; Azuelos, G; Shoaleh saadi, D; Savard, P; Clark, A; Ferrere, D; Gaumer, O P; Diaz gutierrez, M A; Liu, Y; Dubnickova, A; Sykora, I; Strizenec, P; Weichert, J; Zitek, K; Naumann, T; Goessling, C; Klingenberg, R; Jakobs, K; Rurikova, Z; Werner, M W; Arnold, H R; Buscher, D; Hanke, P; Stamen, R; Dietzsch, T A; Kiryunin, A; Salihagic, D; Buchholz, P; Pacheco pages, A; Sushkov, S; Porto fernandez, M D C; Cruz josa, R; Vos, M A; Schwindling, J; Ponsot, P; Charignon, C; Kivernyk, O; Goodrick, M J; Hill, J C; Green, B J; Quarman, C V; Bates, R L; Allwood-spiers, S E; Quilty, D; Chilingarov, A; Long, R E; Barton, A E; Konstantinidis, N; Simmons, B; Davison, A R; Christodoulou, V; Wastie, R L; Gallas, E J; Cox, J; Dehchar, M; Behr, J K; Pickering, M A; Filippas, A; Panagoulias, I; Tenenbaum katan, Y D; Roth, I; Pitt, M; Citron, Z H; Benhammou, Y; Amram, N Y N; Soffer, A; Gorodeisky, R; Antonelli, M; Chiarella, V; Curatolo, M; Esposito, B; Nicoletti, G; Martini, A; Sansoni, A; Carlino, G; Del prete, T; Bini, C; Vari, R; Kuna, M; Pinamonti, M; Itoh, Y; Colijn, A P; Klous, S; Garitaonandia elejabarrieta, H; Rosendahl, P L; Taga, A V; Malecki, P; Malecki, P; Wolter, M W; Kowalski, T; Korcyl, G M; Caprini, M; Caprini, I; Dita, P; Olariu, A; Tudorache, A; Lytken, E; Hidvegi, A; Aliyev, M; Alexeev, G; Bardin, D; Kakurin, S; Lebedev, A; Golubykh, S; Chepurnov, V; Gostkin, M; Kolesnikov, V; Karpova, Z; Davkov, K I; Yeletskikh, I; Grishkevich, Y; Rud, V; Myagkov, A; Nikolaenko, V; Starchenko, E; Zaytsev, A; Fakhrutdinov, R; Cheine, I; Istin, S; Sahin, S; Teng, P; Chu, M L; Trilling, G H; Heinemann, B; Richoz, N; Degeorge, C; Youssef, S; Pilcher, J; Cheng, Y; Purohit, M V; Kravchenko, A; Calkins, R E; Blazey, G; Hauser, R; Koll, J D; Reinsch, A; Brost, E C; Allen, B W; Lankford, A J; Ciobotaru, M D; Slagle, K J; Haffa, B; Mann, A; Loginov, A; Cummings, J T; Loyal, J D; Skubic, P L; Boudreau, J F; Lee, B E; Redlinger, G; Wlodek, T; Carcassi, G; Sexton, K A; Yu, D; Deng, W; Metcalfe, J E; Panitkin, S; Sijacki, D; Mikuz, M; Kramberger, G; Tartarelli, G F; Farilla, A; Stanescu, C; Herrberg, R; Alconada verzini, M J; Brennan, A J; Varvell, K; Marroquim, F; Gomes, A A; Do amaral coutinho, Y; Gingrich, D; Moore, R W; Dolejsi, J; Valkar, S; Broz, J; Jindra, T; Kohout, Z; Kral, V; Mann, A W; Calfayan, P P; Langer, T; Hamacher, K; Sanny, B; Wagner, W; Flick, T; Redelbach, A R; Ke, Y; Higon-rodriguez, E; Donini, J N; Lafarguette, P; Adye, T J; Baines, J; Barnett, B; Wickens, F J; Martin, V J; Jackson, J N; Prichard, P; Kretzschmar, J; Martin, A J; Walker, C J; Potter, K M; Kourkoumelis, C; Tzamarias, S; Houiris, A G; Iliadis, D; Fanti, M; Bertolucci, F; Maleev, V; Sultanov, S; Rosenberg, E I; Krumnack, N E; Bieganek, C; Diehl, E B; Mc kee, S P; Eppig, A P; Harper, D R; Liu, C; Schwarz, T A; Mazor, B; Looper, K A; Wiedenmann, W; Huang, P; Stahlman, J M; Battaglia, M; Nielsen, J A; Zhao, T; Khanov, A; Kaushik, V S; Vichou, E; Liss, A M; Gemme, C; Morettini, P; Parodi, F; Passaggio, S; Rossi, L; Kuzhir, P; Ignatenko, A; Ferrari, R; Spairani, M; Pianori, E; Sekula, S J; Firan, A I; Cao, T; Hetherly, J W; Gouighri, M; Vassilakopoulos, V; Long, M C; Shimojima, M; Sawyer, L H; Brummett, R E; Losada, M A; Schorlemmer, A L; Mantoani, M; Bawa, H S; Mornacchi, G; Nicquevert, B; Palestini, S; Stapnes, S; Veness, R; Kotamaki, M J; Sorde, C; Iengo, P; Campana, S; Goossens, L; Zajacova, Z; Pribyl, L; Poveda torres, J; Marzin, A; Conti, G; Carrillo montoya, G D; Kroseberg, J; Gonella, L; Velz, T; Schmitt, S; Lobodzinska, E M; Lovschall-jensen, A E; Galster, G; Perrot, G; Cailles, M; Berger, N; Barnovska, Z; Delsart, P; Lleres, A; Tisserant, S; Grivaz, J; Matricon, P; Bellagamba, L; Bertin, A; Bruschi, M; De castro, S; Semprini cesari, N; Fabbri, L; Rinaldi, L; Quayle, W B; Truong, T N L; Kondo, T; Haruyama, T; Ng, C; Do valle wemans, A; Almeida veloso, F M; Konovalov, S; Ziegler, J M; Su, D; Lukas, W; Prince, S; Ortega urrego, E J; Teuscher, R J; Knecht, N; Pretzl, K; Borer, C; Gadomski, S; Koch, B; Kuleshov, S; Brooks, W K; Antos, J; Kulkova, I; Chudoba, J; Chyla, J; Tomasek, L; Bazalova, M; Messmer, I; Tobias, J; Sundermann, J E; Kuehn, S S; Kluge, E; Scharf, V L; Barillari, T; Kluth, S; Menke, S; Weigell, P; Schwegler, P; Ziolkowski, M; Casado lechuga, P M; Garcia, C; Sanchez, J; Costa mezquita, M J; Valero biot, J A; Laporte, J; Nikolaidou, R; Virchaux, M; Nguyen, V T H; Charlton, D; Harrison, K; Slater, M W; Newman, P R; Parker, A M; Ward, P; Mcgarvie, S A; Kilvington, G J; D'auria, S; O'shea, V; Mcglone, H M; Fox, H; Henderson, R; Kartvelishvili, V; Davies, B; Sherwood, P; Fraser, J T; Lancaster, M A; Tseng, J C; Hays, C P; Apolle, R; Dixon, S D; Parker, K A; Gazis, E; Papadopoulou, T; Panagiotopoulou, E; Karastathis, N; Hershenhorn, A D; Milov, A; Groth-jensen, J; Bilokon, H; Miscetti, S; Canale, V; Rebuzzi, D M; Capua, M; Bagnaia, P; De salvo, A; Gentile, S; Safai tehrani, F; Solfaroli camillocci, E; Sasao, N; Tsunada, K; Massaro, G; Magrath, C A; Van kesteren, Z; Beker, M G; Van den wollenberg, W; Bugge, L; Buran, T; Read, A L; Gjelsten, B K; Banas, E A; Turnau, J; Derendarz, D K; Kisielewska, D; Chesneanu, D; Rotaru, M; Maurer, J B; Wong, M L; Lund-jensen, B; Asman, B; Jon-and, K B; Silverstein, S B; Johansen, M; Alexandrov, I; Iatsounenko, I; Krumshteyn, Z; Peshekhonov, V; Rybaltchenko, K; Samoylov, V; Cheplakov, A; Kekelidze, G; Lyablin, M; Teterine, V; Bednyakov, V; Kruchonak, U; Shiyakova, M M; Demichev, M; Denisov, S P; Fenyuk, A; Djobava, T; Salukvadze, G; Cetin, S A; Brau, B P; Pais, P R; Proudfoot, J; Van gemmeren, P; Zhang, Q; Beringer, J A; Ely, R; Leggett, C; Pengg, F X; Barnett, M R; Quick, R E; Williams, S; Gardner jr, R W; Huston, J; Brock, R; Wanotayaroj, C; Unel, G N; Taffard, A C; Frate, M; Baker, K O; Tipton, P L; Hutchison, A; Walsh, B J; Norberg, S R; Su, J; Tsybyshev, D; Caballero bejar, J; Ernst, M U; Wellenstein, H; Vudragovic, D; Vidic, I; Gorelov, I V; Toms, K; Alimonti, G; Petrucci, F; Kolanoski, H; Smith, J; Jeng, G; Watson, I J; Guimaraes ferreira, F; Miranda vieira xavier, F; Araujo pereira, R; Poffenberger, P; Sopko, V; Elmsheuser, J; Wittkowski, J; Glitza, K; Gorfine, G W; Ferrer soria, A; Fuster verdu, J A; Sanchis lozano, A; Reinmuth, G; Busato, E; Haywood, S J; Mcmahon, S J; Qian, W; Villani, E G; Laycock, P J; Poll, A J; Rizvi, E S; Foster, J M; Loebinger, F; Forti, A; Plano, W G; Brown, G J A; Kordas, K; Vegni, G; Ohsugi, T; Iwata, Y; Cherkaoui el moursli, R; Sahin, M; Akyazi, E; Carlsen, A; Kanwal, B; Cochran jr, J H; Aronnax, M V; Lockner, M J; Zhou, B; Levin, D S; Weaverdyck, C J; Grom, G F; Rudge, A; Ebenstein, W L; Jia, B; Yamaoka, J; Jared, R C; Wu, S L; Banerjee, S; Lu, Q; Hughes, E W; Alkire, S P; Degenhardt, J D; Lipeles, E D; Spencer, E N; Savine, A; Cheu, E C; Lampl, W; Veatch, J R; Roberts, K; Atkinson, M J; Odino, G A; Polesello, G; Martin, T; White, A P; Stephens, R; Grinbaum sarkisyan, E; Vartapetian, A; Yu, J; Sosebee, M; Thilagar, P A; Spurlock, B; Bonde, R; Filthaut, F; Klok, P; Hoummada, A; Ouchrif, M; Pellegrini, G; Rafi tatjer, J M; Navarro, G A; Blumenschein, U; Weingarten, J C; Mueller, D; Graber, L; Gao, Y; Bode, A; Capeans garrido, M D M; Carli, T; Wells, P; Beltramello, O; Vuillermet, R; Dudarev, A; Salzburger, A; Torchiani, C I; Serfon, C L G; Sloper, J E; Duperrier, G; Lilova, P T; Knecht, M O; Lassnig, M; Anders, G; Deviveiros, P; Young, C; Sforza, F; Shaochen, C; Lu, F; Wermes, N; Wienemann, P; Schwindt, T; Hansen, P H; Hansen, J B; Pingel, A M; Massol, N; Elles, S L; Hallewell, G D; Rozanov, A; Vacavant, L; Fournier, D A; Poggioli, L; Puzo, P M; Tanaka, R; Escalier, M A; Makovec, N; Rezynkina, K; De cecco, S; Cavalleri, P G; Massa, I; Zoccoli, A; Tanaka, S; Odaka, S; Mitsui, S; Tomasio pina, J A; Santos, H F; Satsounkevitch, I; Harkusha, S; Baranov, S; Nechaeva, P; Kayumov, F; Kazanin, V; Asai, M; Mount, R P; Nelson, T K; Smith, D; Kenney, C J; Malone, C M; Kobel, M; Friedrich, F; Grohs, J P; Jais, W J; O'neil, D C; Warburton, A T; Vincter, M; Mccarthy, T G; Groer, L S; Pham, Q T; Taylor, W J; La marra, D; Perrin, E; Wu, X; Bell, W H; Delitzsch, C M; Feng, C; Zhu, C; Tokar, S; Bruncko, D; Kupco, A; Marcisovsky, M; Jakoubek, T; Bruneliere, R; Aktas, A; Narrias villar, D I; Tapprogge, S; Mattmann, J; Kroha, H; Crespo, J; Korolkov, I; Cavallaro, E; Cabrera urban, S; Mitsou, V; Kozanecki, W; Mansoulie, B; Pabot, Y; Etienvre, A; Bauer, F; Chevallier, F; Bouty, A R; Watkins, P; Watson, A; Faulkner, P J W; Curtis, C J; Murillo quijada, J A; Grout, Z J; Chapman, J D; Cowan, G D; George, S; Boisvert, V; Mcmahon, T R; Doyle, A T; Thompson, S A; Britton, D; Smizanska, M; Campanelli, M; Butterworth, J M; Loken, J; Renton, P; Barr, A J; Issever, C; Short, D; Crispin ortuzar, M; Tovey, D R; French, R; Rozen, Y; Alexander, G; Kreisel, A; Conventi, F; Raulo, A; Schioppa, M; Susinno, G; Tassi, E; Giagu, S; Luci, C; Nisati, A; Cobal, M; Ishikawa, A; Jinnouchi, O; Bos, K; Verkerke, W; Vermeulen, J; Van vulpen, I B; Kieft, G; Mora, K D; Olsen, F; Rohne, O M; Pajchel, K; Nilsen, J K; Wosiek, B K; Wozniak, K W; Badescu, E; Jinaru, A; Bohm, C; Johansson, E K; Sjoelin, J B R; Clement, C; Buszello, C P; Huseynova, D; Boyko, I; Popov, B; Poukhov, O; Vinogradov, V; Tsiareshka, P; Skvorodnev, N; Soldatov, A; Chuguev, A; Gushchin, V; Yazici, E; Lutz, M S; Malon, D; Vanyashin, A; Lavrijsen, W; Spieler, H; Biesiada, J L; Bahr, M; Kong, J; Tatarkhanov, M; Ogren, H; Van kooten, R J; Cwetanski, P; Butler, J M; Shank, J T; Chakraborty, D; Ermoline, I; Sinev, N; Whiteson, D O; Corso radu, A; Huang, J; Werth, M P; Kastoryano, M; Meirose da silva costa, B; Namasivayam, H; Hobbs, J D; Schamberger jr, R D; Guo, F; Potekhin, M; Popovic, D; Gorisek, A; Sokhrannyi, G; Hofsajer, I W; Mandelli, L; Ceradini, F; Graziani, E; Giorgi, F; Zur nedden, M E G; Grancagnolo, S; Volpi, M; Nunes hanninger, G; Rados, P K; Milesi, M; Cuthbert, C J; Black, C W; Fink grael, F; Fincke-keeler, M; Keeler, R; Kowalewski, R V; Berghaus, F O; Qi, M; Davidek, T; Tas, P; Jakubek, J; Duckeck, G; Walker, R; Mitterer, C A; Harenberg, T; Sandvoss, S A; Del peso, J; Llorente merino, J; Gonzalez millan, V; Irles quiles, A; Crouau, M; Gris, P L Y; Liauzu, S; Romano saez, S M; Gallop, B J; Jones, T J; Austin, N C; Morris, J; Duerdoth, I; Thompson, R J; Kelly, M P; Leisos, A; Garas, A; Pizio, C; Venda pinto, B A; Kudin, L; Qian, J; Wilson, A W; Mietlicki, D; Long, J D; Sang, Z; Arms, K E; Rahimi, A M; Moss, J J; Oh, S H; Parker, S I; Parsons, J; Cunitz, H; Vanguri, R S; Sadrozinski, H; Lockman, W S; Martinez-mc kinney, G; Goussiou, A; Jones, A; Lie, K; Hasegawa, Y; Olcese, M; Gilewsky, V; Harrison, P F; Janus, M; Spangenberg, M; De, K; Ozturk, N; Pal, A K; Darmora, S; Bullock, D J; Oviawe, O; Derkaoui, J E; Rahal, G; Sircar, A; Frey, A S; Stolte, P; Rosien, N; Zoch, K; Li, L; Schouten, D W; Catinaccio, A; Ciapetti, M; Delruelle, N; Ellis, N; Farthouat, P; Hoecker, A; Klioutchnikova, T; Macina, D; Malyukov, S; Spiwoks, R D; Unal, G P; Vandoni, G; Petersen, B A; Pommes, K; Nairz, A M; Wengler, T; Mladenov, D; Solans sanchez, C A; Lantzsch, K; Schmieden, K; Jakobsen, S; Ritsch, E; Sciuccati, A; Alves dos santos, A M; Ouyang, Q; Zhou, M; Brock, I C; Janssen, J; Katzy, J; Anders, C F; Nilsson, B S; Bazan, A; Di ciaccio, L; Yildizkaya, T; Collot, J; Malek, F; Trocme, B S; Breugnon, P; Godiot, S; Adam bourdarios, C; Coulon, J; Duflot, L; Petroff, P G; Zerwas, D; Lieuvin, M; Calderini, G; Laporte, D; Ocariz, J; Gabrielli, A; Ohska, T K; Kurochkin, Y; Kantserov, V; Vasilyeva, L; Speransky, M; Smirnov, S; Antonov, A; Bulekov, O; Tikhonov, Y; Sargsyan, L; Vardanyan, G; Budick, B; Kocian, M L; Luitz, S; Young, C C; Grenier, P J; Kelsey, M; Black, J E; Kneringer, E; Jussel, P; Horton, A J; Beaudry, J; Chandra, A; Ereditato, A; Topfel, C M; Mathieu, R; Bucci, F; Muenstermann, D; White, R M; He, M; Urban, J; Straka, M; Vrba, V; Schumacher, M; Parzefall, U; Mahboubi, K; Sommer, P O; Koepke, L H; Bethke, S; Moser, H; Wiesmann, M; Walkowiak, W A; Fleck, I J; Martinez-perez, M; Sanchez sanchez, C A; Jorgensen roca, S; Accion garcia, E; Sainz ruiz, C A; Valls ferrer, J A; Amoros vicente, G; Vives torrescasana, R; Ouraou, A; Formica, A; Hassani, S; Watson, M F; Cottin buracchio, G F; Bussey, P J; Saxon, D; Ferrando, J E; Collins-tooth, C L; Hall, D C; Cuhadar donszelmann, T; Dawson, I; Duxfield, R; Argyropoulos, T; Brodet, E; Livneh, R; Shougaev, K; Reinherz, E I; Guttman, N; Beretta, M M; Vilucchi, E; Aloisio, A; Patricelli, S; Caprio, M; Cevenini, F; De vecchi, C; Livan, M; Rimoldi, A; Vercesi, V; Ayad, R; Mastroberardino, A; Ciapetti, G; Luminari, L; Rescigno, M; Santonico, R; Salamon, A; Del papa, C; Kurashige, H; Homma, Y; Tomoto, M; Horii, Y; Sugaya, Y; Hanagaki, K; Bobbink, G; Kluit, P M; Koffeman, E N; Van eijk, B; Lee, H; Eigen, G; Dorholt, O; Strandlie, A; Strzempek, P B; Dita, S; Stoicea, G; Chitan, A; Leven, S S; Moa, T; Brenner, R; Ekelof, T J C; Olshevskiy, A; Roumiantsev, V; Chlachidze, G; Zimine, N; Gusakov, Y; Grigalashvili, N; Mineev, M; Potrap, I; Barashkou, A; Shoukavy, D; Shaykhatdenov, B; Pikelner, A; Gladilin, L; Ammosov, V; Abramov, A; Arik, M; Sahinsoy, M; Uysal, Z; Azizi, K; Hotinli, S C; Zhou, S; Berger, E; Blair, R; Underwood, D G; Einsweiler, K; Garcia-sciveres, M A; Siegrist, J L; Kipnis, I; Dahl, O; Holland, S; Barbaro galtieri, A; Smith, P T; Parua, N; Franklin, M; Mercurio, K M; Tong, B; Pod, E; Cole, S G; Hopkins, W H; Guest, D H; Severini, H; Marsicano, J J; Abbott, B K; Wang, Q; Lissauer, D; Ma, H; Takai, H; Rajagopalan, S; Protopopescu, S D; Snyder, S S; Undrus, A; Popescu, R N; Begel, M A; Blocker, C A; Amelung, C; Mandic, I; Macek, B; Tucker, B H; Citterio, M; Troncon, C; Orestano, D; Taccini, C; Romeo, G L; Dova, M T; Taylor, G N; Gesualdi manhaes, A; Mcpherson, R A; Sobie, R; Taylor, R P; Dolezal, Z; Kodys, P; Slovak, R; Sopko, B; Vacek, V; Sanders, M P; Hertenberger, R; Meineck, C; Becks, K; Kind, P; Sandhoff, M; Cantero garcia, J; De la torre perez, H; Castillo gimenez, V; Ros, E; Hernandez jimenez, Y; Chadelas, R; Santoni, C; Washbrook, A J; O'brien, B J; Wynne, B M; Mehta, A; Vossebeld, J H; Landon, M; Teixeira dias castanheira, M; Cerrito, L; Keates, J R; Fassouliotis, D; Chardalas, M; Manousos, A; Grachev, V; Seliverstov, D; Sedykh, E; Cakir, O; Ciftci, R; Edson, W; Prell, S A; Rosati, M; Stroman, T; Jiang, H; Neal, H A; Li, X; Gan, K K; Smith, D S; Kruse, M C; Ko, B R; Leung fook cheong, A M; Cole, B; Angerami, A R; Greene, Z S; Kroll, J I; Van berg, R P; Forbush, D A; Lubatti, H; Raisher, J; Shupe, M A; Wolin, S; Oshita, H; Gaudio, G; Das, R; Konig, A C; Croft, V A; Harvey, A; Maaroufi, F; Melo, I; Greenwood jr, Z D; Shabalina, E; Mchedlidze, G; Drechsler, E; Rieger, J K; Blackston, M; Colombo, T

    2002-01-01

    % ATLAS \\\\ \\\\ ATLAS is a general-purpose experiment for recording proton-proton collisions at LHC. The ATLAS collaboration consists of 144 participating institutions (June 1998) with more than 1750~physicists and engineers (700 from non-Member States). The detector design has been optimized to cover the largest possible range of LHC physics: searches for Higgs bosons and alternative schemes for the spontaneous symmetry-breaking mechanism; searches for supersymmetric particles, new gauge bosons, leptoquarks, and quark and lepton compositeness indicating extensions to the Standard Model and new physics beyond it; studies of the origin of CP violation via high-precision measurements of CP-violating B-decays; high-precision measurements of the third quark family such as the top-quark mass and decay properties, rare decays of B-hadrons, spectroscopy of rare B-hadrons, and $ B ^0 _{s} $-mixing. \\\\ \\\\The ATLAS dectector, shown in the Figure includes an inner tracking detector inside a 2~T~solenoid providing an axial...

  20. Site characterization for hybrid system construction

    Energy Technology Data Exchange (ETDEWEB)

    Saldana, R.; Miranda, U.; Medrano, M. C. [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    The basic reason to use alternative systems for electricity generation, in most cases, is the lack of electricity services, such as isolated rural communities which are located far away from the electric distribution line, and the cost of its extension is too expensive, while decentralized power systems can be an economic and appropriate solution to providing these services. Up to now there are several technological options for rural electrification using PV modules, wind plants, water-power plants, anaerobic digesters, or a combination of some of them, according to the availability of energetic resources. The applications include centralized or decentralized systems, autonomous or hybrid systems, isolated or interconnected to the electric line, etc. A particular hybrid system design can be done considering two general aspects, first it is necessary to know the electric consumption that will be supplied, taking into account present and future necessities and how local energetic resources are present in a selected site. Finally, also it is necessary to carry out an economic analysis to determine the cost of kilowatt-hour generated using local energetic resources and compare it with the cost of electricity produced by conventional power systems. [Espanol] La razon principal para el uso de sistemas alternativos de generacion de electricidad, en la mayoria de los casos, es la falta de servicios de electricidad, tal como en las comunidades rurales aisladas localizadas lejos de linea de distribucion electrica, donde el costo de su extension es demasiado caro, mientras que los sistemas descentralizados de energia pueden ser una solucion economica y adecuada para proporcionar estos servicios. Hasta ahora existen varias opciones tecnologicas para la electrificacion rural usando modulos fotovoltaicos, aerogeneradores, plantas hidroelectricas, digestores anaerobicos o una combinacion de algunos de ellos, de acuerdo con la disponibilidad de los recursos energeticos. Las

  1. Site characterization for hybrid system construction

    Energy Technology Data Exchange (ETDEWEB)

    Saldana, R; Miranda, U; Medrano, M C [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    The basic reason to use alternative systems for electricity generation, in most cases, is the lack of electricity services, such as isolated rural communities which are located far away from the electric distribution line, and the cost of its extension is too expensive, while decentralized power systems can be an economic and appropriate solution to providing these services. Up to now there are several technological options for rural electrification using PV modules, wind plants, water-power plants, anaerobic digesters, or a combination of some of them, according to the availability of energetic resources. The applications include centralized or decentralized systems, autonomous or hybrid systems, isolated or interconnected to the electric line, etc. A particular hybrid system design can be done considering two general aspects, first it is necessary to know the electric consumption that will be supplied, taking into account present and future necessities and how local energetic resources are present in a selected site. Finally, also it is necessary to carry out an economic analysis to determine the cost of kilowatt-hour generated using local energetic resources and compare it with the cost of electricity produced by conventional power systems. [Espanol] La razon principal para el uso de sistemas alternativos de generacion de electricidad, en la mayoria de los casos, es la falta de servicios de electricidad, tal como en las comunidades rurales aisladas localizadas lejos de linea de distribucion electrica, donde el costo de su extension es demasiado caro, mientras que los sistemas descentralizados de energia pueden ser una solucion economica y adecuada para proporcionar estos servicios. Hasta ahora existen varias opciones tecnologicas para la electrificacion rural usando modulos fotovoltaicos, aerogeneradores, plantas hidroelectricas, digestores anaerobicos o una combinacion de algunos de ellos, de acuerdo con la disponibilidad de los recursos energeticos. Las

  2. Effects of organizational complexity and resources on construction site risk.

    Science.gov (United States)

    Forteza, Francisco J; Carretero-Gómez, Jose M; Sesé, Albert

    2017-09-01

    Our research is aimed at studying the relationship between risk level and organizational complexity and resources on constructions sites. Our general hypothesis is that site complexity increases risk, whereas more resources of the structure decrease risk. A Structural Equation Model (SEM) approach was adopted to validate our theoretical model. To develop our study, 957 building sites in Spain were visited and assessed in 2003-2009. All needed data were obtained using a specific tool developed by the authors to assess site risk, structure and resources (Construction Sites Risk Assessment Tool, or CONSRAT). This tool operationalizes the variables to fit our model, specifically, via a site risk index (SRI) and 10 organizational variables. Our random sample is composed largely of small building sites with general high levels of risk, moderate complexity, and low resources on site. The model obtained adequate fit, and results showed empirical evidence that the factors of complexity and resources can be considered predictors of site risk level. Consequently, these results can help companies, managers of construction and regulators to identify which organizational aspects should be improved to prevent risks on sites and consequently accidents. Copyright © 2017 National Safety Council and Elsevier Ltd. All rights reserved.

  3. Construction of a sTGC Prototype for the ATLAS-MUON Upgrade

    CERN Document Server

    Guan, Liang; The ATLAS collaboration; Zhu, Junjie; Smakhtin, Vladimir; Shoa, Meir

    2014-01-01

    The innermost station (Small Wheel) of the ATLAS muon spectrometer end-cap will be replaced with the New Small Wheel (NSW) to profit from the high luminosity runs of LHC after phase I upgrade . sTGC will be the primary trigger detectors proving Level-1 trigger as well as complementing the precision muon tracking. In order to qualify materials and gain experiences for serious mass production of NSW sTGC detector modules, a 1.3 m x 1.1 mm sTGC quadruplet prototype is successfully constructed and tested. Details of the construction procedures will be presented. Control of the module flatness, machined strip board precision and alignment of different detector layers will be shown.

  4. Mapping site-based construction workers’ motivation: Expectancy theory approach

    Directory of Open Access Journals (Sweden)

    Parviz Ghoddousi

    2014-03-01

    Full Text Available The aim of this study is to apply a recently proposed model of motivation based on expectancy theory to site-based workers in the construction context and confirm the validity of this model for the construction industry. The study drew upon data from 194 site-based construction workers in Iran to test the proposed model of motivation. To this end, the structural equation modelling (SEM approach based on the confirmatory factor analysis (CFA technique was deployed. The study reveals that the proposed model of expectancy theory incorporating five indicators (i.e. intrinsic instrumentality, extrinsic instrumentality, intrinsic valence, extrinsic valence and expectancy is able to map the process of construction workers’ motivation. Nonetheless, the findings posit that intrinsic indicators could be more effective than extrinsic ones. This proffers the necessity of construction managers placing further focus on intrinsic motivators to motivate workers. 

  5. Mapping site-based construction workers’ motivation: Expectancy theory approach

    Directory of Open Access Journals (Sweden)

    Parviz Ghoddousi

    2014-03-01

    Full Text Available The aim of this study is to apply a recently proposed model of motivation based on expectancy theory to site-based workers in the construction context and confirm the validity of this model for the construction industry. The study drew upon data from 194 site-based construction workers in Iran to test the proposed model of motivation. To this end, the structural equation modelling (SEM approach based on the confirmatory factor analysis (CFA technique was deployed. The study reveals that the proposed model of expectancy theory incorporating five indicators (i.e. intrinsic instrumentality, extrinsic instrumentality, intrinsic valence, extrinsic valence and expectancy is able to map the process of construction workers’ motivation. Nonetheless, the findings posit that intrinsic indicators could be more effective than extrinsic ones. This proffers the necessity of construction managers placing further focus on intrinsic motivators to motivate workers.

  6. Accident Causal Factors on the Building Construction Sites: A Review

    Directory of Open Access Journals (Sweden)

    Opeyemi Samuel Williams

    2018-01-01

    Full Text Available The concerns for cost, quality and timely delivery of projects have been in existence from time immemorial, whereas the passion for these should be extended to safe execution of site works by the construction participants, as safety of life is very paramount. However, high level of commitment that is essential for the safe execution of site works has become a taboo. Hence, a plethora of accidents takes place on the site ranging from falls from height, contact with working tools, vehicle-related, slip and trip, collapse, exposure to harmful substances, to lifting and handling object accidents. It is pertinent to know that, responsibility for accidents on site cuts across all project participants (clients, consultants, contractors, workers, as well as the construction site environment. Recognition of the construction participants and site environmental factors as agents of accident is the focus of this research. Through extensive review of literature, a copious number of factors were identified and subsequently grouped under five factors as client-related, consultant-related, contractor-related, construction workers-related, and construction site-related. However, there has been a dearth of research in the grouping of accident contributing factors. The identification and understanding of these factors will go a long way in mitigating construction accidents, coupled with proven measures taken in positively addressing them. Efforts to prevent these causative factors include inter alia elimination of hazards from design, effective safety management, adequate planning of activities and employment of seasoned professionals by the client. The contractors are to embark on staff safety auditing, set up safety committees, conduct regular training for staff, use innovative technology, uphold housekeeping and report accident occurrence, while strict adherence to safety regulations must be adopted by all construction operatives.

  7. Nucleic acid constructs containing orthogonal site selective recombinases (OSSRs)

    Energy Technology Data Exchange (ETDEWEB)

    Gilmore, Joshua M.; Anderson, J. Christopher; Dueber, John E.

    2017-08-29

    The present invention provides for a recombinant nucleic acid comprising a nucleotide sequence comprising a plurality of constructs, wherein each construct independently comprises a nucleotide sequence of interest flanked by a pair of recombinase recognition sequences. Each pair of recombinase recognition sequences is recognized by a distinct recombinase. Optionally, each construct can, independently, further comprise one or more genes encoding a recombinase capable of recognizing the pair of recombinase recognition sequences of the construct. The recombinase can be an orthogonal (non-cross reacting), site-selective recombinase (OSSR).

  8. Design and Construction of Large Size Micromegas Chambers for the Upgrade of the ATLAS Muon Spectrometer

    CERN Document Server

    Lösel, Philipp; Müller, Ralph

    2015-01-01

    Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. A total surface of about $\\mathbf{150~m^2}$ of the forward regions of the Muon Spectrometer of the ATLAS detector at LHC will be equipped with 8-layer Micromegas modules. Each layer covers more than $\\mathbf{2~m^2}$ for a total active area of $\\mathbf{1200~m^2}$. Together with the small strip Thin Gap Chambers they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS endcap muon tracking system in the 2018/19 shutdown. In order to achieve a 15$\\mathbf{\\%}$ transverse momentum resolution for $\\mathbf{1~TeV}$ muons, in addition to an excellent intrinsic resolution, the mechanical precision of each plane of the assembled module must be as good as $\\mathbf{30~\\mu m}$ along the precision coordinate and $\\mathbf{80~\\mu m}$ perpendicular to the chamber. The design and construction procedure of the Micromegas modules will be presented, as well as the design for the assembly ...

  9. Design and Construction of Large Size Micromegas Chambers for the ATLAS Upgrade of the Muon Spectrometer

    CERN Document Server

    Losel, Philipp Jonathan; The ATLAS collaboration

    2014-01-01

    Large area Micromegas detectors will be employed fo r the first time in high-energy physics experiments. A total surface of about 150 m$^2$ of the forward regions of the Muon Spectrometer of the ATLAS detector at LHC will be equipped with 8-layer Micromegas modules. Each module extends over a surface from 2 to 3 m$^2$ for a total active area of 1200 m$^2$. Together with the small strip Thin Gap Chambers they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS endcap muon tracking system in the 2018/19 shutdown. In order to achieve a 15% transverse momentum resol ution for 1 TeV muons, in addition to an excellent intrinsic resolution, the mechanical prec ision of each plane of the assembled module must be as good as 30 $\\mu$m along the precision coordi nate and 80 $\\mu$m perpendicular to the chamber. The design and construction procedure of the microm egas modules will be presented, as well as the design for the assembly of modules onto the New Small Wheel. Emphasis wi...

  10. Mechanisation and automation technologies development in work at construction sites

    Science.gov (United States)

    Sobotka, A.; Pacewicz, K.

    2017-10-01

    Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.

  11. Experience in Grid Site Testing for ATLAS, CMS and LHCb with HammerCloud

    International Nuclear Information System (INIS)

    Elmsheuser, Johannes; Legger, Federica; Llamas, Ramón Medrano; Sciabà, Andrea; García, Mario Úbeda; Ster, Daniel van der; Sciacca, Gianfranco

    2012-01-01

    Frequent validation and stress testing of the network, storage and CPU resources of a grid site is essential to achieve high performance and reliability. HammerCloud was previously introduced with the goals of enabling VO- and site-administrators to run such tests in an automated or on-demand manner. The ATLAS, CMS and LHCb experiments have all developed VO plugins for the service and have successfully integrated it into their grid operations infrastructures. This work will present the experience in running HammerCloud at full scale for more than 3 years and present solutions to the scalability issues faced by the service. First, we will show the particular challenges faced when integrating with CMS and LHCb offline computing, including customized dashboards to show site validation reports for the VOs and a new API to tightly integrate with the LHCbDIRAC Resource Status System. Next, a study of the automatic site exclusion component used by ATLAS will be presented along with results for tuning the exclusion policies. A study of the historical test results for ATLAS, CMS and LHCb will be presented, including comparisons between the experiments’ grid availabilities and a search for site-based or temporal failure correlations. Finally, we will look to future plans that will allow users to gain new insights into the test results; these include developments to allow increased testing concurrency, increased scale in the number of metrics recorded per test job (up to hundreds), and increased scale in the historical job information (up to many millions of jobs per VO).

  12. Experience in Grid Site Testing for ATLAS, CMS and LHCb with HammerCloud

    Science.gov (United States)

    Elmsheuser, Johannes; Medrano Llamas, Ramón; Legger, Federica; Sciabà, Andrea; Sciacca, Gianfranco; Úbeda García, Mario; van der Ster, Daniel

    2012-12-01

    Frequent validation and stress testing of the network, storage and CPU resources of a grid site is essential to achieve high performance and reliability. HammerCloud was previously introduced with the goals of enabling VO- and site-administrators to run such tests in an automated or on-demand manner. The ATLAS, CMS and LHCb experiments have all developed VO plugins for the service and have successfully integrated it into their grid operations infrastructures. This work will present the experience in running HammerCloud at full scale for more than 3 years and present solutions to the scalability issues faced by the service. First, we will show the particular challenges faced when integrating with CMS and LHCb offline computing, including customized dashboards to show site validation reports for the VOs and a new API to tightly integrate with the LHCbDIRAC Resource Status System. Next, a study of the automatic site exclusion component used by ATLAS will be presented along with results for tuning the exclusion policies. A study of the historical test results for ATLAS, CMS and LHCb will be presented, including comparisons between the experiments’ grid availabilities and a search for site-based or temporal failure correlations. Finally, we will look to future plans that will allow users to gain new insights into the test results; these include developments to allow increased testing concurrency, increased scale in the number of metrics recorded per test job (up to hundreds), and increased scale in the historical job information (up to many millions of jobs per VO).

  13. Construction Site Workers’ Awareness on Using Safety Equipment: Case Study

    Directory of Open Access Journals (Sweden)

    Ulang N. Md

    2014-01-01

    Full Text Available Construction sector is an important sector and contributed significantly to national development. However, this sector poses higher risk to accident. This is due to fact that construction site can be considered as a dangerous zone to workers and to the public. Due to the variety of cases occurs on site, the contractor will usually have to pay the cost related to accidents in the form of higher insurance premium. Despite various measures, accidents still occur at construction sites. Personal Protective Equipment (PPE is one of the important means to protect the wearer from hazards in the workplace. Since this equipment is the last frontier of the wearer from worksite hazards, it is important to select it based on the job scope and the intended protection. Therefore, this study was formulated to find out the level of knowledge and awareness of construction workers on PPE usage. It was also important to know what make the workers would want or do not want to use the PPE. It was found in this study that the level of awareness and knowledge among workers on the proper use of PPE is moderate. Construction sites accident can be further be reduced with proper implementation of PPE voluntarily by all workers.

  14. Greenhouse Gas Emissions from Excavation on Residential Construction Sites

    Directory of Open Access Journals (Sweden)

    Perry Forsythe

    2014-12-01

    Full Text Available Despite considerable research concerning the manifestation of greenhouse gases in the usage of buildings, little has been done concerning emissions arising from the construction process itself. This paper specifically examines emissions arising from cut and fill excavation on residential construction sites. Even though such excavation is often seen as being economical in terms of providing a flat base for concrete raft slab construction, the environmental consequences of this approach need to be considered more fully in terms of impact on the environment. This is particularly important when steeply sloping sites are involved and for different soil types. The paper undertakes a study that quantitatively assesses the cumulative greenhouse gas emissions caused by cut and fill excavation on 52 residential projects in Australia for a range of slope and soil types. The paper presents results from the study and concludes that greenhouse gas emissions increase as site slope increases; the building footprint area (as distinct from Gross Floor Area, exposes the need to reduce the area of the building to reduce greenhouse gas emissions; excavation of rock soils creates higher emissions than other soil types; and cut and fill excavation on steeply slope sites increase emissions. Potential alternative construction includes suspended floor construction systems which involve less excavation.

  15. Greenhouse Gas Emissions from Excavation on Residential Construction Sites

    Directory of Open Access Journals (Sweden)

    Perry Forsythe

    2014-12-01

    Full Text Available Despite considerable research concerning the manifestation of greenhouse gases in the usage of buildings, little has been done concerning emissions arising from the construction process itself. This paper specifically examines emissions arising from cut and fill excavation on residential construction sites. Even though such excavation is often seen as being economical in terms of providing a flat base for concrete raft slab construction, the environmental consequences of this approach need to be considered more fully in terms of impact on the environment. This is particularly important when steeply sloping sites are involved and for different soil types. The paper undertakes a study that quantitatively assesses the cumulative greenhouse gas emissions caused by cut and fill excavation on 52 residential projects in Australia for a range of slope and soil types. The paper presents results from the study and concludes that greenhouse gas emissions increase as site slope increases; the building footprint area (as distinct from Gross Floor Area, exposes the need to reduce the area of the building to reduce greenhouse gas emissions; excavation of rock soils creates higher emissions than other soil types; and cut and fill excavation on steeply slope sites increase emissions. Potential alternative construction includes suspended floor construction systems which involve less excavation. 

  16. Event-based soil loss models for construction sites

    Science.gov (United States)

    Trenouth, William R.; Gharabaghi, Bahram

    2015-05-01

    The elevated rates of soil erosion stemming from land clearing and grading activities during urban development, can result in excessive amounts of eroded sediments entering waterways and causing harm to the biota living therein. However, construction site event-based soil loss simulations - required for reliable design of erosion and sediment controls - are one of the most uncertain types of hydrologic models. This study presents models with improved degree of accuracy to advance the design of erosion and sediment controls for construction sites. The new models are developed using multiple linear regression (MLR) on event-based permutations of the Universal Soil Loss Equation (USLE) and artificial neural networks (ANN). These models were developed using surface runoff monitoring datasets obtained from three sites - Greensborough, Cookstown, and Alcona - in Ontario and datasets mined from the literature for three additional sites - Treynor, Iowa, Coshocton, Ohio and Cordoba, Spain. The predictive MLR and ANN models can serve as both diagnostic and design tools for the effective sizing of erosion and sediment controls on active construction sites, and can be used for dynamic scenario forecasting when considering rapidly changing land use conditions during various phases of construction.

  17. Causes of Fall Hazards in Construction Site Management

    OpenAIRE

    Liy, Chong Hui; Ibrahim, Siti Halipah; Affandi, Rohaida; Rosli, Nor Azalina; Nawi, Mohd Nasrun Mohd

    2016-01-01

    Statistics from Occupational Safety and Health Act 1994 has shown that the number of fatality in the construction industry is 5 times more than in other sectors. The total fatalities in construction are 796 in year 2013 and out of this 796, there were 294 fall fatalities. Hence, there is an urgent need to mitigate this problem. A study has been conducted to investigate the root causes of fall hazards in construction site. Therefore, this paper is intended to identify and highlights the types ...

  18. Effectiveness of Practicing Supply Chain Management in Construction Site

    Directory of Open Access Journals (Sweden)

    Mamter S.

    2014-01-01

    Full Text Available Construction Supply chain management comprised of the network of organization involved in the different processes and activities which produce the material, components and services that come together to design, procurement and deliver a building. It also consists of different organizations involved in the construction process including client/owner, designer, contractor, subcontractor and suppliers. This paper shall present on the implementation of supply chain management in construction and the effectiveness of practicing SCM in construction site. A field study is done from the viewpoint of contractor and consultant then analysed by using average index methods and presented in a statistical analysis. From the analysis, it reveals that effectiveness of practicing the SCM give a lot of good performances and granted benefits to contractor. The statistical analysis produced first ranking effectiveness of SCM is can minimize waste of material and labor for construction project.

  19. Luminosity Measurement at ATLAS Development, Construction and Test of Scintillating Fibre Prototype Detectors

    CERN Document Server

    Ask, S; Braem, André; Cheiklali, C; Efthymiopoulos, I; Fournier, D; de La Taille, C; Di Girolamo, B; Grafström, P; Joram, C; Haguenauer, Maurice; Hedberg, V; Lavigne, B; Maio, A; Mapelli, A; Mjörnmark, U; Puzo, P; Rijssenbeek, M; Santos, J; Saraiva, J G; Stenzel, H; Thioye, M; Valladolid, E; Vorobel, V

    2006-01-01

    We are reporting about a scintillating fibre tracking detector which is proposed for the precise determination of the absolute luminosity of the CERN LHC at interaction point 1 where the ATLAS experiment is located. The detector needs to track protons elastically scattered under $\\mu$rad angles in direct vicinity to the LHC beam. It is based on square shaped scintillating plastic fibres read out by multi-anode photomultiplier tubes and is housed in Roman Pots. We describe the design and construction of prototype detectors and the results of a beam test experiment at DESY. The excellent detector performance established in this test validates the detector design and supports the feasibility of the proposed challenging method of luminosity measurement.

  20. A novel methodology to estimate the evolution of construction waste in construction sites.

    Science.gov (United States)

    Katz, Amnon; Baum, Hadassa

    2011-02-01

    This paper focuses on the accumulation of construction waste generated throughout the erection of new residential buildings. A special methodology was developed in order to provide a model that will predict the flow of construction waste. The amount of waste and its constituents, produced on 10 relatively large construction sites (7000-32,000 m(2) of built area) was monitored periodically for a limited time. A model that predicts the accumulation of construction waste was developed based on these field observations. According to the model, waste accumulates in an exponential manner, i.e. smaller amounts are generated during the early stages of construction and increasing amounts are generated towards the end of the project. The total amount of waste from these sites was estimated at 0.2m(3) per 1m(2) floor area. A good correlation was found between the model predictions and actual data from the field survey. Copyright © 2010 Elsevier Ltd. All rights reserved.

  1. Population-based respiratory 4D motion atlas construction and its application for VR simulations of liver punctures

    Science.gov (United States)

    Mastmeyer, Andre; Wilms, Matthias; Handels, Heinz

    2018-03-01

    Virtual reality (VR) training simulators of liver needle insertion in the hepatic area of breathing virtual patients often need 4D image data acquisitions as a prerequisite. Here, first a population-based breathing virtual patient 4D atlas is built and second the requirement of a dose-relevant or expensive acquisition of a 4D CT or MRI data set for a new patient can be mitigated by warping the mean atlas motion. The breakthrough contribution of this work is the construction and reuse of population-based, learned 4D motion models.

  2. Experience in Grid Site Testing for ATLAS, CMS and LHCb with HammerCloud

    CERN Document Server

    Van der Ster , D; Medrano Llamas, R; Legger , F; Sciaba, A; Sciacca, G; Ubeda Garca , M

    2012-01-01

    Frequent validation and stress testing of the network, storage and CPU resources of a grid site is essential to achieve high performance and reliability. HammerCloud was previously introduced with the goals of enabling VO- and site-administrators to run such tests in an automated or on-demand manner. The ATLAS, CMS and LHCb experiments have all developed VO plugins for the service and have successfully integrated it into their grid operations infrastructures. This work will present the experience in running HammerCloud at full scale for more than 3 years and present solutions to the scalability issues faced by the service. First, we will show the particular challenges faced when integrating with CMS and LHCb offline computing, including customized dashboards to show site validation reports for the VOs and a new API to tightly integrate with the LHCbDIRAC Resource Status System. Next, a study of the automatic site exclusion component used by ATLAS will be presented along with results for tuning the exclusion p...

  3. Experience in Grid Site Testing for ATLAS, CMS and LHCb with HammerCloud

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    Frequent validation and stress testing of the network, storage and CPU resources of a grid site is essential to achieve high performance and reliability. HammerCloud was previously introduced with the goals of enabling VO- and site-administrators to run such tests in an automated or on-demand manner. The ATLAS, CMS and LHCb experiments have all developed VO plugins for the service and have successfully integrated it into their grid operations infrastructures. This work will present the experience in running HammerCloud at full scale for more than 3 years and present solutions to the scalability issues faced by the service. First, we will show the particular challenges faced when integrating with CMS and LHCb offline computing, including customized dashboards to show site validation reports for the VOs and a new API to tightly integrate with the LHCbDIRAC Resource Status System. Next, a study of the automatic site exclusion component used by ATLAS will be presented along with results for tuning the exclusion ...

  4. Quality assurance during site construction of nuclear power plants

    International Nuclear Information System (INIS)

    1981-01-01

    This Safety Guide provides requirements and recommendations related to the establishment and implementation of a quality assurance programme for the site construction activities at nuclear power plants. These include activities such as fabricating, erecting, installing, handling, storing, cleaning, flushing, inspecting, testing, modifying, repairing, and maintaining

  5. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE ITER

    Science.gov (United States)

    In Fall 1994, anaerobic compost wetlands in both upflow and downflow configurations were constructed adjacent to and received drainage from the Burleigh Tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The e...

  6. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE TECHNOLOGY CAPSULE

    Science.gov (United States)

    In fall 1994, anaerobic compost wetlands in both upflow and down flow configurations were constructed adjacent to and received drainage from the Burleigh tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The ...

  7. Proposed genetic algorithms for construction site lay out

    NARCIS (Netherlands)

    Mawdesley, Michael J.; Al-Jibouri, Saad H.S.

    2003-01-01

    The positioning of temporary facilities on a construction site is an area of research which has been recognised as important but which has received relatively little attention. In this paper, a genetic algorithm is proposed to solve the problem in which m facilities are to be positioned to n

  8. Design and Construction of Precision Tooling for Construction of Micromegas Detectors for the ATLAS Small Wheel Upgrade Project in Germany

    CERN Document Server

    Losel, Philipp Jonathan; The ATLAS collaboration; Schaile, Otto; Hertenberger, Ralf; Biebel, Otmar; Bortfeldt, Jonathan; Flierl, Bernhard Matthias

    2016-01-01

    Mechanical precision is a key-aspect of the high-rate capable Micromegas detectors for the upgrade of the Small Wheels of the ATLAS muon spectrometer. 32 SM2 quadruplets will be built by four German institutes with cathodes and strip-anodes made of stable honeycomb sandwiches. To achieve a single plane resolution below $100\\mu m$ the deviation from planarity of a single detector plane must not exceed $80\\mu m$ over the whole active area and the global position of the readout strips has to be within $30\\mu m$ for a single readout-plane of 3 PCB's, as well as between all four planes of a quadruplet. Precision tooling is used for the correct positioning of readout PCB's and readout sandwich planes. For quality control of the planarity of the sandwich planes a laser distance sensor combined with a coordinate measurement system has been developed. Deviation from planarity below 10 $\\mu$m can be easily resolved. We will present key features of the challenging construction procedure to achieve this high level of pre...

  9. ATLAS off-Grid sites (Tier 3) monitoring. From local fabric monitoring to global overview of the VO computing activities

    CERN Document Server

    PETROSYAN, A; The ATLAS collaboration; BELOV, S; ANDREEVA, J; KADOCHNIKOV, I

    2012-01-01

    The ATLAS Distributed Computing activities have so far concentrated in the "central" part of the experiment computing system, namely the first 3 tiers (the CERN Tier0, 10 Tier1 centers and over 60 Tier2 sites). Many ATLAS Institutes and National Communities have deployed (or intend to) deploy Tier-3 facilities. Tier-3 centers consist of non-pledged resources, which are usually dedicated to data analysis tasks by the geographically close or local scientific groups, and which usually comprise a range of architectures without Grid middleware. Therefore a substantial part of the ATLAS monitoring tools which make use of Grid middleware, cannot be used for a large fraction of Tier3 sites. The presentation will describe the T3mon project, which aims to develop a software suite for monitoring the Tier3 sites, both from the perspective of the local site administrator and that of the ATLAS VO, thereby enabling the global view of the contribution from Tier3 sites to the ATLAS computing activities. Special attention in p...

  10. Genetic algorithm optimization for dynamic construction site layout planning

    Directory of Open Access Journals (Sweden)

    Farmakis Panagiotis M.

    2018-02-01

    Full Text Available The dynamic construction site layout planning (DCSLP problem refers to the efficient placement and relocation of temporary construction facilities within a dynamically changing construction site environment considering the characteristics of facilities and work interrelationships, the shape and topography of the construction site, and the time-varying project needs. A multi-objective dynamic optimization model is developed for this problem that considers construction and relocation costs of facilities, transportation costs of resources moving from one facility to another or to workplaces, as well as safety and environmental considerations resulting from facilities’ operations and interconnections. The latter considerations are taken into account in the form of preferences or constraints regarding the proximity or remoteness of particular facilities to other facilities or work areas. The analysis of multiple project phases and the dynamic facility relocation from phase to phase highly increases the problem size, which, even in its static form, falls within the NP (for Nondeterministic Polynomial time- hard class of combinatorial optimization problems. For this reason, a genetic algorithm has been implemented for the solution due to its capability to robustly search within a large solution space. Several case studies and operational scenarios have been implemented through the Palisade’s Evolver software for model testing and evaluation. The results indi­cate satisfactory model response to time-varying input data in terms of solution quality and computation time. The model can provide decision support to site managers, allowing them to examine alternative scenarios and fine-tune optimal solutions according to their experience by introducing desirable preferences or constraints in the decision process.

  11. Insights into Architects’ Future Roles in Off-Site Construction

    Directory of Open Access Journals (Sweden)

    Jianing Luo

    2017-03-01

    Full Text Available Today’s construction industry is overflowing with new ideas about its future. Off-Site Manufacture and Construction (OSCM is at the heart of the modern construction industry. Much has been written about the state and context of OSCM in different countries regarding its perceived benefits and barriers to implementation. Off-site production (OSP plays an important role in improving fragmented construction processes. Although most OSP research targets the attitudes and practices of OSP adoption, there is limited understanding of the philosophical issues underpinning OSP-related architecture. The roles of the architects’ personal philosophies are neglected and this hampers their implementation of OSCM (which has had a largely technical focus. This paper explores the traditional thinking patterns of architects in China and predicts possible future roles for them. It then conceptualizes an “architectural work” mode and a “building product” mode of design and construction and identifies the shortcomings of architects in an OSCM environment. The arguments made are based on practitioners’ perceptions and the first author’s practical experiences of leading several real-life projects in recent years. The findings reveal the implications and significance of the transformation from an “architectural work” mode to a “building product” mode. We foresee a study approach that focuses on the order and rules for OSCM, resulting in architects’ existing mindsets being changed to thinking patterns and design methodologies better suited to OSCM.

  12. Behavior-based safety on construction sites: a case study.

    Science.gov (United States)

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in

  13. Construction and test of new precision drift-tube chambers for the ATLAS muon spectrometer

    Energy Technology Data Exchange (ETDEWEB)

    Kroha, H., E-mail: kroha@mpp.mpg.de; Kortner, O.; Schmidt-Sommerfeld, K.; Takasugi, E.

    2017-02-11

    ATLAS muon detector upgrades aim for increased acceptance for muon triggering and precision tracking and for improved rate capability of the muon chambers in the high-background regions of the detector with increasing LHC luminosity. The small-diameter Muon Drift Tube (sMDT) chambers have been developed for these purposes. With half of the drift-tube diameter of the MDT chambers and otherwise unchanged operating parameters, sMDT chambers share the advantages of the MDTs, but have an order of magnitude higher rate capability and can be installed in detector regions where MDT chambers do not fit in. The chamber assembly methods have been optimized for mass production, minimizing construction time and personnel. Sense wire positioning accuracies of 5 μm have been achieved in serial production for large-size chambers comprising several hundred drift tubes. The construction of new sMDT chambers for installation in the 2016/17 winter shutdown of the LHC and the design of sMDT chambers in combination with new RPC trigger chambers for replacement of the inner layer of the barrel muon spectrometer are in progress.

  14. Construction and test of new precision drift-tube chambers for the ATLAS muon spectrometer

    Science.gov (United States)

    Kroha, H.; Kortner, O.; Schmidt-Sommerfeld, K.; Takasugi, E.

    2017-02-01

    ATLAS muon detector upgrades aim for increased acceptance for muon triggering and precision tracking and for improved rate capability of the muon chambers in the high-background regions of the detector with increasing LHC luminosity. The small-diameter Muon Drift Tube (sMDT) chambers have been developed for these purposes. With half of the drift-tube diameter of the MDT chambers and otherwise unchanged operating parameters, sMDT chambers share the advantages of the MDTs, but have an order of magnitude higher rate capability and can be installed in detector regions where MDT chambers do not fit in. The chamber assembly methods have been optimized for mass production, minimizing construction time and personnel. Sense wire positioning accuracies of 5 μm have been achieved in serial production for large-size chambers comprising several hundred drift tubes. The construction of new sMDT chambers for installation in the 2016/17 winter shutdown of the LHC and the design of sMDT chambers in combination with new RPC trigger chambers for replacement of the inner layer of the barrel muon spectrometer are in progress.

  15. Construction and Test of New Precision Drift-Tube Chambers for the ATLAS Muon Spectrometer

    CERN Document Server

    INSPIRE-00218480

    2017-02-11

    ATLAS muon detector upgrades aim for increased acceptance for muon triggering and precision tracking and for improved rate capability of the muon chambers in the high-background regions of the detector with increasing LHC luminosity. The small-diameter Muon Drift Tube (sMDT) chambers have been developed for these purposes. With half of the drift-tube diameter of the MDT chambers and otherwise unchanged operating parameters, sMDT chambers share the advantages of the MDTs, but have an order of magnitude higher rate capability and can be installed in detector regions where MDT chambers do not fit in. The chamber assembly methods have been optimized for mass production, minimizing construction time and personnel. Sense wire positioning accuracies of 5 ?micons have been achieved in serial production for large-size chambers comprising several hundred drift tubes. The construction of new sMDT chambers for installation in the 2016/17 winter shutdown of the LHC and the design of sMDT chambers in combination with new R...

  16. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  17. Writing for the web composing, coding, and constructing web sites

    CERN Document Server

    Applen, JD

    2013-01-01

    Writing for the Web unites theory, technology, and practice to explore writing and hypertext for website creation. It integrates such key topics as XHTML/CSS coding, writing (prose) for the Web, the rhetorical needs of the audience, theories of hypertext, usability and architecture, and the basics of web site design and technology. Presenting information in digestible parts, this text enables students to write and construct realistic and manageable Web sites with a strong theoretical understanding of how online texts communicate to audiences. Key features of the book

  18. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  19. Investigation and demonstration of turbidity reduction in stormwater runoff for Oklahoma highway construction sites : final report.

    Science.gov (United States)

    2013-12-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction industry to control the discharge of pollutants from the sites. The construction effluent guidelines or ELGs require construction sites to reduce the pollu...

  20. AUTOCAD IN THE OPERATIONAL MANAGEMENT OF THE CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Tsareva Marina Vladimirovna

    2016-04-01

    Full Text Available Operational management of the construction is usually based on information analysis systems, which are aimed at the monitoring of working schedule and volumes as consistent with predicated schedules. The result of such systems’ operation is traditional information graphics (diagrams, charts, etc., which provides idea on the current state of the construction site and deviations from the planned settings. The author considers the visualization technology of construction of objects using an image of the situation on the AutoCAD drawings, converted into an interactive format. The article focuses on imperfections of the existing technologies of information support of the managers. The creation of unified IT platform is offered on the basis of CAD for creating an integrated information storage and visualization of the environment using electronic drawings and diagrams. Using interactive methods it is possible to illustrate the condition of almost any part of the construction project using these drawings and diagrams. E-drawings contain the basic information resources - estimates, plans, sections, specifications, technology, construction, etc. necessary for the calculation of indicators. The author proved that implementation of visualization is most efficient in case of electronic drawings in 3D format.

  1. Design, construction, quality checks and test results of first resistive-Micromegas read-out boards for the ATLAS experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00215943; The ATLAS collaboration; Kuger, Fabian

    2015-01-01

    The development work carried out at CERN to push the Micromegas technology to a new frontier is now coming to an end. The construction of the first read-out boards for the upgrade of the ATLAS muon system will demonstrate in full-scale the feasibility of this ambitious project. The read-out boards, representing the heart of the detector, are manufactured in industries, making the Micromegas for ATLAS the first MPGD for a large experiment with a relevant part industrially produced. The boards are 50 cm wide and up to 220 cm long, carrying copper strips 315 μm wide with 415 μm pitch. Interconnected resistive strips, having the same pattern as the copper strips, provide spark protection. The boards are completed by the creation of cylindrical pillars 128 μm high, 280 μm in diameter and arranged in a triangular array 7 mm aside. The total number of boards to be produced for ATLAS is 2048 of 32 different types. We will review the main design parameters of the read-out boards for the ATLAS Micromegas, following...

  2. Construction and test of high precision drift-tube (sMDT) chambers for the ATLAS muon spectrometer

    CERN Document Server

    Nowak, Sebastian; Kroha, Hubert; Schwegler, Philipp; Sforza, Federico

    2014-01-01

    For the upgrade of the ATLAS muon spectrometer in March 2014 new muon tracking chambers (sMDT) with drift-tubes of 15 mm diameter, half of the value of the standard ATLAS Monitored Drift-Tubes (MDT) chambers, and 10~$\\mu$m positioning accuracy of the sense wires have been constructed. The new chambers are designed to be fully compatible with the present ATLAS services but, with respect to the previously installed ATLAS MDT chambers, they are assembled in a more compact geometry and they deploy two additional tube layers that provide redundant rack information. The chambers are composed of 8 layers of in total 624 aluminium drift-tubes. The assembly of a chamber is completed within a week. A semi-automatized production line is used for the assembly of the drift-tubes prior to the chamber assembly. The production procedures and the quality control tests of the single components and of the complete chambers will be discussed. The wire position in the completed chambers have been measured by using a coordinate me...

  3. Memory handling in the ATLAS submission system from job definition to sites limits

    Science.gov (United States)

    Forti, A. C.; Walker, R.; Maeno, T.; Love, P.; Rauschmayr, N.; Filipcic, A.; Di Girolamo, A.

    2017-10-01

    In the past few years the increased luminosity of the LHC, changes in the linux kernel and a move to a 64bit architecture have affected the ATLAS jobs memory usage and the ATLAS workload management system had to be adapted to be more flexible and pass memory parameters to the batch systems, which in the past wasn’t a necessity. This paper describes the steps required to add the capability to better handle memory requirements, included the review of how each component definition and parametrization of the memory is mapped to the other components, and what changes had to be applied to make the submission chain work. These changes go from the definition of tasks and the way tasks memory requirements are set using scout jobs, through the new memory tool developed to do that, to how these values are used by the submission component of the system and how the jobs are treated by the sites through the CEs, batch systems and ultimately the kernel.

  4. Memory handling in the ATLAS submission system from job definition to sites limits

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00027700; The ATLAS collaboration; Walker, Rodney; Maeno, Tadashi; Love, Peter; Rauschmayr, Nathalie; Filipcic, Andrej; Di Girolamo, Alessandro

    2017-01-01

    In the past few years the increased luminosity of the LHC, changes in the linux kernel and a move to a 64bit architecture have affected the ATLAS jobs memory usage and the ATLAS workload management system had to be adapted to be more flexible and pass memory parameters to the batch systems, which in the past wasn’t a necessity. This paper describes the steps required to add the capability to better handle memory requirements, included the review of how each component definition and parametrization of the memory is mapped to the other components, and what changes had to be applied to make the submission chain work. These changes go from the definition of tasks and the way tasks memory requirements are set using scout jobs, through the new memory tool developed to do that, to how these values are used by the submission component of the system and how the jobs are treated by the sites through the CEs, batch systems and ultimately the kernel.

  5. Design and Construction of Large Size Micromegas Chambers for the ATLAS Upgrade of the Muon Spectrometer

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-07-01

    Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. A total surface of about 150 m{sup 2} of the forward regions of the Muon Spectrometer of the ATLAS detector at LHC will be equipped with 8-layer Micromegas modules. Each module extends over a surface from 2 to 3 m{sup 2} for a total active area of 1200 m{sup 2}. Together with the small strip Thin Gap Chambers they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS end-cap muon tracking system in the 2018/19 shutdown. In order to achieve a 15% transverse momentum resolution for 1 TeV muons, in addition to an excellent intrinsic resolution, the mechanical precision of each plane of the assembled module must be as good as 30 μm along the precision coordinate and 80 μm perpendicular to the chamber. In the prototyping towards the final configuration two similar quadruplets with dimensions 1.2 x 0.5 m{sup 2} have been built with the same structure as foreseen for the NSW upgrade. It represents the first example of a Micromegas quadruplet ever built, realized using the resistive-strip technology and decoupling the amplification mesh from the readout structure. All readout planes are segmented into strips with a pitch of 400 μm for a total of 4096 strips. In two of the four planes the strips are inclined by 1.5 deg. and provide a measurement of the second coordinate. The design and construction procedure of the Micromegas modules will be presented, as well as the design for the assembly of modules onto the New Small Wheel. Emphasis will be given on the methods developed to achieve the challenging mechanical precision. Measurements of deformation on chamber prototypes as a function of thermal gradients, gas over-pressure and internal stress (mesh tension and module fixation on supports) will be also shown in comparison to simulation. These tests were essential in the development of the final design in order to minimize the

  6. Siting, design and construction of underground repositories for radioactive wastes

    International Nuclear Information System (INIS)

    1986-01-01

    The objectives of the Symposium were to provide a forum for exchange of information internationally on the various scientific, technological, engineering and safety bases for the siting, design and construction of underground repositories, and to highlight current important issues and identify possible approaches. Forty-nine papers were presented, covering general approaches and regulatory aspects, disposal in shallow ground and rock cavities, disposal in deep geological formations and safety assessments related to the subject of the Symposium. Separate abstracts were prepared for each of these papers

  7. Unique Construction and Social Experiences in Residential Remediation Sites - 13423

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Paul; Scarborough, Rebecca [Sevenson Environmental Services, Inc. 2749 Lockport Road, Niagara Falls, NY 14305 (United States)

    2013-07-01

    Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

  8. Pyramiding tumuli waste disposal site and method of construction thereof

    Science.gov (United States)

    Golden, Martin P.

    1989-01-01

    An improved waste disposal site for the above-ground disposal of low-level nuclear waste as disclosed herein. The disposal site is formed from at least three individual waste-containing tumuli, wherein each tumuli includes a central raised portion bordered by a sloping side portion. Two of the tumuli are constructed at ground level with adjoining side portions, and a third above-ground tumulus is constructed over the mutually adjoining side portions of the ground-level tumuli. Both the floor and the roof of each tumulus includes a layer of water-shedding material such as compacted clay, and the clay layer in the roofs of the two ground-level tumuli form the compacted clay layer of the floor of the third above-ground tumulus. Each tumulus further includes a shield wall, preferably formed from a solid array of low-level handleable nuclear wate packages. The provision of such a shield wall protects workers from potentially harmful radiation when higher-level, non-handleable packages of nuclear waste are stacked in the center of the tumulus.

  9. Unique Construction and Social Experiences in Residential Remediation Sites - 13423

    International Nuclear Information System (INIS)

    Jung, Paul; Scarborough, Rebecca

    2013-01-01

    Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

  10. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    International Nuclear Information System (INIS)

    Yu, Ann T.W.; Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Highlights: ► A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. ► However, the reduction cannot be sustained. ► Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006–2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  11. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk [Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong); Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara [Department of Civil and Structural Engineering, Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong)

    2013-01-15

    Highlights: Black-Right-Pointing-Pointer A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. Black-Right-Pointing-Pointer However, the reduction cannot be sustained. Black-Right-Pointing-Pointer Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  12. Construction of patient specific atlases from locally most similar anatomical pieces

    Science.gov (United States)

    Ramus, Liliane; Commowick, Olivier; Malandain, Grégoire

    2010-01-01

    Radiotherapy planning requires accurate delineations of the critical structures. To avoid manual contouring, atlas-based segmentation can be used to get automatic delineations. However, the results strongly depend on the chosen atlas, especially for the head and neck region where the anatomical variability is high. To address this problem, atlases adapted to the patient’s anatomy may allow for a better registration, and already showed an improvement in segmentation accuracy. However, building such atlases requires the definition of a criterion to select among a database the images that are the most similar to the patient. Moreover, the inter-expert variability of manual contouring may be high, and therefore bias the segmentation if selecting only one image for each region. To tackle these issues, we present an original method to design a piecewise most similar atlas. Given a query image, we propose an efficient criterion to select for each anatomical region the K most similar images among a database by considering local volume variations possibly induced by the tumor. Then, we present a new approach to combine the K images selected for each region into a piecewise most similar template. Our results obtained with 105 CT images of the head and neck show that our method reduces the over-segmentation seen with an average atlas while being robust to inter-expert manual segmentation variability. PMID:20879395

  13. Construction of Site Risk Model using Individual Unit Risk Model in a NPP Site

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Ho Gon; Han, Sang Hoon [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Since Fukushima accident, strong needs to estimate site risk has been increased to identify the possibility of re-occurrence of such a tremendous disaster and prevent such a disaster. Especially, in a site which has large fleet of nuclear power plants, reliable site risk assessment is very emergent to confirm the safety. In Korea, there are several nuclear power plant site which have more than 6 NPPs. In general, risk model of a NPP in terms of PSA is very complicated and furthermore, it is expected that the site risk model is more complex than that. In this paper, the method for constructing site risk model is proposed by using individual unit risk model. Procedure for the development of site damage (risk) model was proposed in the present paper. Since the site damage model is complicated in the sense of the scale of the system and dependency of the components of the system, conventional method may not be applicable in many side of the problem.

  14. Yucca Mountain Site Characterization Project exploratory studies facilities construction status

    International Nuclear Information System (INIS)

    Allan, J.N.; Leonard, T.M.

    1993-01-01

    This paper discusses the progress to date on the construction planning and development of the Yucca Mountain Site Characterization Project (YMP) Exploratory Studies Facilities (ESF). The purpose of the ESF is to determine early site suitability and to characterize the subsurface of the Yucca Mountain site to assess its suitability for a potential high level nuclear waste repository. The present ESF configuration concept is for two main ramps to be excavated by tunnel boring machines (TBM) from the surface to the Topopah Spring Member of the Paintbrush Tuff Formation. From the main ramps, slightly above Topopah Spring level, supplemental ramps will be penetrated to the Calico Hills formation below the potential repository. There will be exploratory development drifts driven on both levels with the Main Test Area being located on the Topopah Spring level, which is the level of the proposed repository. The Calico Hills formation lies below the Topopah Spring member and is expected to provide the main geo-hydrologic barrier between the potential repository and the underlying saturated zones in the Crater Flat Tuff

  15. Construction and QA/QC of the Micromegas Pavia Readout Panels for the Muon Spectrometer Upgrade of the ATLAS New Small Wheel

    CERN Document Server

    Kourkoumeli-Charalampidi, Athina; The ATLAS collaboration

    2016-01-01

    In order to cope with the required precision tracking and trigger capabilities from Run III onwards in the ATLAS experiment, the innermost layer of the Muon Spectrometer endcap (Small Wheels) will be upgraded. The New Small Wheel (NSW) will be equipped with eight layers of MicroMegas (MM) detectors and eight layers of small-strip Thin Gap Chambers (sTGC), both arranged in two quadruplets. MM detectors of large size (up to 3 m$^2$) will be employed for the first time in HEP experiments. Four different types of MM quadruplets modules (SM1, SM2, LM1, LM2), built by different Institutes, will compose the NSW. The Italian INFN is responsible for the construction of the SM1 modules. The construction is shared among different INFN sites, Pavia being responsible for the readout panel construction. Due to the challenging mechanical specifications (with precisions of tens microns over meters), the construction procedure has been optimized to obtain the required strip alignment precision in the panel. A number of data q...

  16. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong.

    Science.gov (United States)

    Yu, Ann T W; Poon, C S; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C&D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C&D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C&D waste. Copyright © 2012 Elsevier Ltd. All rights reserved.

  17. Safety management system during rock blasting at FRFCF construction site

    International Nuclear Information System (INIS)

    Vijayakumaran, C.; Kandasamy, S.; Satpathy, K.K.

    2016-01-01

    Blasting is an important activity during rock excavation to reach required depth for obtaining stability of the civil structure. For the construction of various Plant Buildings of Fast Reactor Fuel Cycle Facility (FRFCF), IGCAR at Kalpakkam, based on the geological survey it is required to reach a depth of 21.4 meters from existing ground level. This paper details about the procedures and precaution adopted during the rock blasting activities at FRFCF site. The volume of rock removed by blasting was 3 lakh cubic meters. The total number of blasting carried out was 304 using 105.73 tons of blasting material. The entire blasting work could be completed within 174 days without any incident. (author)

  18. Sonar atlas of caverns comprising the U.S. Strategic Petroleum Reserve. Volume 2, Big Hill Site, Texas.

    Energy Technology Data Exchange (ETDEWEB)

    Rautman, Christopher Arthur; Lord, Anna Snider

    2007-08-01

    Downhole sonar surveys from the four active U.S. Strategic Petroleum Reserve sites have been modeled and used to generate a four-volume sonar atlas, showing the three-dimensional geometry of each cavern. This volume 2 focuses on the Big Hill SPR site, located in southeastern Texas. Volumes 1, 3, and 4, respectively, present images for the Bayou Choctaw SPR site, Louisiana, the Bryan Mound SPR site, Texas, and the West Hackberry SPR site, Louisiana. The atlas uses a consistent presentation format throughout. The basic geometric measurements provided by the down-cavern surveys have also been used to generate a number of geometric attributes, the values of which have been mapped onto the geometric form of each cavern using a color-shading scheme. The intent of the various geometrical attributes is to highlight deviations of the cavern shape from the idealized cylindrical form of a carefully leached underground storage cavern in salt. The atlas format does not allow interpretation of such geometric deviations and anomalies. However, significant geometric anomalies, not directly related to the leaching history of the cavern, may provide insight into the internal structure of the relevant salt dome.

  19. Sonar atlas of caverns comprising the U.S. Strategic Petroleum Reserve. Volume 1, Bayou Choctaw site, Louisiana.

    Energy Technology Data Exchange (ETDEWEB)

    Rautman, Christopher Arthur; Lord, Anna Snider

    2007-10-01

    Downhole sonar surveys from the four active U.S. Strategic Petroleum Reserve sites have been modeled and used to generate a four-volume sonar atlas, showing the three-dimensional geometry of each cavern. This volume 1 focuses on the Bayou Choctaw SPR site, located in southern Louisiana. Volumes 2, 3, and 4, respectively, present images for the Big Hill SPR site, Texas, the Bryan Mound SPR site, Texas, and the West Hackberry SPR site, Louisiana. The atlas uses a consistent presentation format throughout. The basic geometric measurements provided by the down-cavern surveys have also been used to generate a number of geometric attributes, the values of which have been mapped onto the geometric form of each cavern using a color-shading scheme. The intent of the various geometrical attributes is to highlight deviations of the cavern shape from the idealized cylindrical form of a carefully leached underground storage cavern in salt. The atlas format does not allow interpretation of such geometric deviations and anomalies. However, significant geometric anomalies, not directly related to the leaching history of the cavern, may provide insight into the internal structure of the relevant salt dome.

  20. Sonar atlas of caverns comprising the U.S. Strategic Petroleum Reserve. Volume 3, Bryan Mound Site, Texas.

    Energy Technology Data Exchange (ETDEWEB)

    Rautman, Christopher Arthur; Lord, Anna Snider

    2007-09-01

    Downhole sonar surveys from the four active U.S. Strategic Petroleum Reserve sites have been modeled and used to generate a four-volume sonar atlas, showing the three-dimensional geometry of each cavern. This volume 3 focuses on the Bryan Mound SPR site, located in southeastern Texas. Volumes 1, 2, and 4, respectively, present images for the Bayou Choctaw SPR site, Louisiana, the Big Hill SPR site, Texas, and the West Hackberry SPR site, Louisiana. The atlas uses a consistent presentation format throughout. The basic geometric measurements provided by the down-cavern surveys have also been used to generate a number of geometric attributes, the values of which have been mapped onto the geometric form of each cavern using a color-shading scheme. The intent of the various geometrical attributes is to highlight deviations of the cavern shape from the idealized cylindrical form of a carefully leached underground storage cavern in salt. The atlas format does not allow interpretation of such geometric deviations and anomalies. However, significant geometric anomalies, not directly related to the leaching history of the cavern, may provide insight into the internal structure of the relevant salt dome.

  1. Sonar atlas of caverns comprising the U.S. Strategic Petroleum Reserve. Volume 4, West Hackberry site, Louisiana.

    Energy Technology Data Exchange (ETDEWEB)

    Rautman, Christopher Arthur; Lord, Anna Snider

    2007-09-01

    Downhole sonar surveys from the four active U.S. Strategic Petroleum Reserve sites have been modeled and used to generate a four-volume sonar atlas, showing the three-dimensional geometry of each cavern. This volume 4 focuses on the West Hackberry SPR site, located in southwestern Louisiana. Volumes 1, 2, and 3, respectively, present images for the Bayou Choctaw SPR site, Louisiana, the Big Hill SPR site, Texas, and the Bryan Mound SPR site, Texas. The atlas uses a consistent presentation format throughout. The basic geometric measurements provided by the down-cavern surveys have also been used to generate a number of geometric attributes, the values of which have been mapped onto the geometric form of each cavern using a color-shading scheme. The intent of the various geometrical attributes is to highlight deviations of the cavern shape from the idealized cylindrical form of a carefully leached underground storage cavern in salt. The atlas format does not allow interpretation of such geometric deviations and anomalies. However, significant geometric anomalies, not directly related to the leaching history of the cavern, may provide insight into the internal structure of the relevant salt dome.

  2. Safety inspections in construction sites: A systems thinking perspective.

    Science.gov (United States)

    Saurin, Tarcisio Abreu

    2016-08-01

    Although safety inspections carried out by government officers are important for the prevention of accidents, there is little in-depth knowledge on their outcomes and processes leading to these. This research deals with this gap by using systems thinking (ST) as a lens for obtaining insights into safety inspections in construction sites. Thirteen case studies of sites with prohibited works were carried out, discussing how four attributes of ST were used in the inspections. The studies were undertaken over 6 years, and sources of evidence involved participant observation, direct observations, analysis of documents and interviews. Two complementary ways for obtaining insights into inspections, based on ST, were identified: (i) the design of the study itself needs to be in line with ST; and (ii) data collection and analysis should focus on the agents involved in the inspections, the interactions between agents, the constraints and opportunities faced by agents, the outcomes of interactions, and the recommendations for influencing interactions. Copyright © 2015 Elsevier Ltd. All rights reserved.

  3. Phenomenology of the Three Site Higgsless Model at the ATLAS Detector of the LHC

    CERN Document Server

    Bach, Fabian; Trefzger, Thomas M

    2009-01-01

    Im sogenannten Three Site Higgsless Model“ [1], das eine Er- ” weiterung des Standardmodells darstellt, wird die elektroschwache Symmetrie nicht durch ein fundamentales Skalarfeld wie das Hig- gsfeld, sondern durch eine erweiterte elektroschwache Eichgruppe SU(2) × SU(2) × U(1) im Sinne einer kompaktifizierten und auf drei Sites dekonstruierten f ̈nften Raumzeitdimension gebrochen. Das u Teilchenspektrum wird dadurch um drei schwere Eichbosonen W ′± und Z ′0 mit Massen zwischen 380 und 600 GeV sowie schwere Fermio- nen mit einer Massenskala von ≳ 3 TeV erweitert. In dieser Arbeit wird durch eine analytische Rechnung gezeigt, dass sich die Unitarit ̈tsgrenze der elastischen Streuung longitudinal pola- a risierter Eichbosonen durch die Beitr ̈ge der neuen Eichbosonen von a ∼ 1 TeV im higgslosen Standardmodell bis auf 2 TeV verschiebt. Weiterhin wird in einer Detektorstudie die M ̈glichkeit der Ent- o deckung der neuen Eichbosonen am ATLAS-Detektor [2, 3, 4, 5] des LHC durch Produktion im s-Ka...

  4. Construction and QA/QC of the MicroMegas Pavia Readout Panels for the Muon Spectrometer Upgrade of the ATLAS Experiment

    CERN Document Server

    Kourkoumeli-Charalampidi, Athina; The ATLAS collaboration

    2016-01-01

    In order to cope with the required precision tracking and trigger capabilities during Run III in ATLAS experiment, the innermost layer of the Muon Spectrometer endcap (Small Wheels) will be upgraded. The New Small Wheel (NSW) will be equipped with eight layers of MicroMegas (MM) detectors and eight layers of small-strip Thin Gap Chambers (sTGC), both arranged in two quadruplets. MM detectors of large size (up to 2 $m^{2}$) will be employed for the first time in HEP experiments. Four different types of MM quadruplets modules (SM1, SM2, LM1, LM2), built by different Institutes, will compose the NSW. Italian INFN is responsible for the construction of the SM1 modules. The construction is shared among different INFN sites. In particular, readout panels are built in Pavia. Due to the challenging mechanical specifications (with precisions of tens microns over meters), the construction procedure has been optimized to obtain the required strip alignment precision in the panel. A number of data quality checks on both ...

  5. Construction of the new silicon microstrips tracker for the Phase-II ATLAS detector

    CERN Document Server

    Liang, Zhijun; The ATLAS collaboration

    2018-01-01

    The inner detector of the present ATLAS detector has been designed and developed to function in the environment of the present Large Hadron Collider (LHC). At the next-generation tracking detector proposed for the High Luminosity LHC (HL-LHC), the so-called ATLAS Phase-II Upgrade, the particle densities and radiation levels will be higher by as much as a factor of ten. The new detectors must be faster, they need to be more highly segmented, and covering more area. They also need to be more resistant to radiation, and they require much greater power delivery to the front-end systems. For those reasons, the inner tracker of the ATLAS detector must be redesigned and rebuilt completely. The design of the ATLAS Upgrade inner tracker (ITk) has already been defined. It consists of several layers of silicon particle detectors. The innermost layers will be composed of silicon pixel sensors, and the outer layers will consist of silicon microstrip sensors. This paper will focus on the latest research and development act...

  6. Construction site Voice Operated Information System (VOIS) test

    Science.gov (United States)

    Lawrence, Debbie J.; Hettchen, William

    1991-01-01

    The Voice Activated Information System (VAIS), developed by USACERL, allows inspectors to verbally log on-site inspection reports on a hand held tape recorder. The tape is later processed by the VAIS, which enters the information into the system's database and produces a written report. The Voice Operated Information System (VOIS), developed by USACERL and Automated Sciences Group, through a ESACERL cooperative research and development agreement (CRDA), is an improved voice recognition system based on the concepts and function of the VAIS. To determine the applicability of the VOIS to Corps of Engineers construction projects, Technology Transfer Test Bad (T3B) funds were provided to the Corps of Engineers National Security Agency (NSA) Area Office (Fort Meade) to procure and implement the VOIS, and to train personnel in its use. This report summarizes the NSA application of the VOIS to quality assurance inspection of radio frequency shielding and to progress payment logs, and concludes that the VOIS is an easily implemented system that can offer improvements when applied to repetitive inspection procedures. Use of VOIS can save time during inspection, improve documentation storage, and provide flexible retrieval of stored information.

  7. Library construction and evaluation for site saturation mutagenesis.

    Science.gov (United States)

    Sullivan, Bradford; Walton, Adam Z; Stewart, Jon D

    2013-06-10

    We developed a method for creating and evaluating site-saturation libraries that consistently yields an average of 27.4±3.0 codons of the 32 possible within a pool of 95 transformants. This was verified by sequencing 95 members from 11 independent libraries within the gene encoding alkene reductase OYE 2.6 from Pichia stipitis. Correct PCR primer design as well as a variety of factors that increase transformation efficiency were critical contributors to the method's overall success. We also developed a quantitative analysis of library quality (Q-values) that defines library degeneracy. Q-values can be calculated from standard fluorescence sequencing data (capillary electropherograms) and the degeneracy predicted from an early stage of library construction (pooled plasmids from the initial transformation) closely matched that observed after ca. 1000 library members were sequenced. Based on this experience, we suggest that this analysis can be a useful guide when applying our optimized protocol to new systems, allowing one to focus only on good-quality libraries and reject substandard libraries at an early stage. This advantage is particularly important when lower-throughput screening techniques such as chiral-phase GC must be employed to identify protein variants with desirable properties, e.g., altered stereoselectivities or when multiple codons are targeted for simultaneous randomization. Copyright © 2013 Elsevier Inc. All rights reserved.

  8. A contribution to the development of an economic atlas of the Houston Area Test Site

    Science.gov (United States)

    1972-01-01

    An outine description of the Houston Area Test Site was prepared, in the form of an atlas-catalog of Universal Transverse Mercator grid coordinate locations, building on the manufacturing sector and expanding along agreed lines as far as possible. It was concluded that (1) the effort expended in securing and verifying the locations of larger manufacturing plants yielded 5,000-plus usable entries, in addition to certain valuable conclusions about the general feasibility of obtaining ground information by economic sector; (2) on the basis of the number and the quality of the usable entries obtained, the resources expended on nonmanufacturing sectors and on historical data cannot be wholly justified; and (3) even without the 5,000-odd locations of completely satisfactory quality, the relatively modest cost of this pilot study secured enough data to provide a sound basis for obtaining feasibly and systematically some appropriate ground information on almost any economic or social activity, together with some indication of their relative areal and economic significance.

  9. Siting and constructing very deep monitoring wells on the US Department of Energy's Nevada Test Site

    International Nuclear Information System (INIS)

    Cullen, J.J.; Jacobson, R.L.; Russell, C.E.

    1991-01-01

    Many aspects of the Nevada Test Site's (NTS) hydrogeologic setting restrict the use of traditional methods for the siting and construction of ground-water characterization and monitoring wells. The size of the NTS precludes establishing high-density networks of characterization wells, as are typically used at smaller sites. The geologic complexity and variability of the NTS requires that the wells be criticality situated. The hydrogeologic complexity requires that each well provide access to many aquifers. Depths to ground water on the NTS require the construction of wells averaging approximately 1000 meters in depth. Wells meeting these criteria are uncommon in the ground-water industry, therefore techniques used by petroleum engineers are being employed to solve certain siting-, design- and installation-related problems. To date, one focus has been on developing completion strings that facilitate routine and efficient ground-water sampling from multiple intervals in a single well. The method currently advocated employs a new design of sliding side door sleeve that is actuated by an electrically operated hydraulic shifting tool. Stemming of the wells is being accomplished with standard materials (cement based grouts and sands); however, new stemming methods are being developed, to accommodate the greater depths, to minimize pH-related problems caused by the use of cements, to enhance the integrity of the inter-zone seals, and to improve the representativeness of radionuclide analyses performed on ground-water samples. Bench-scale experiments have been used to investigate the properties of more than a dozen epoxy-aggregate grout mixtures -- materials that are commonly used in underwater sealing applications

  10. Unbiased group-wise image registration: applications in brain fiber tract atlas construction and functional connectivity analysis.

    Science.gov (United States)

    Geng, Xiujuan; Gu, Hong; Shin, Wanyong; Ross, Thomas J; Yang, Yihong

    2011-10-01

    We propose an unbiased implicit-reference group-wise (IRG) image registration method and demonstrate its applications in the construction of a brain white matter fiber tract atlas and the analysis of resting-state functional MRI (fMRI) connectivity. Most image registration techniques pair-wise align images to a selected reference image and group analyses are performed in the reference space, which may produce bias. The proposed method jointly estimates transformations, with an elastic deformation model, registering all images to an implicit reference corresponding to the group average. The unbiased registration is applied to build a fiber tract atlas by registering a group of diffusion tensor images. Compared to reference-based registration, the IRG registration improves the fiber track overlap within the group. After applying the method in the fMRI connectivity analysis, results suggest a general improvement in functional connectivity maps at a group level in terms of larger cluster size and higher average t-scores.

  11. Construction Site Environmental Impact in Civil Engineering Education

    Science.gov (United States)

    Teixeira, Jose M. Cardoso

    2005-01-01

    The environmental impact of construction activity has gained increasing importance in the last few years and become a key subject for civil engineering education. A survey of Portuguese higher education institutions shows that concern with this topic is mostly directed at the impact of large construction projects and especially focused on their…

  12. Confined Site Construction: A qualitative investigation of critical issues affecting management of Health and Safety

    OpenAIRE

    Spillane, John P.; Oyedele, Lukumon O.; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E.; Tijani, Iyabo K.

    2011-01-01

    The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, th...

  13. NKS NordRisk II: Atlas of long-range atmospheric dispersion and deposition of radionuclides from selected risk sites in the Northern Hemisphere

    DEFF Research Database (Denmark)

    Smith Korsholm, Ulrik; Astrup, Poul; Lauritzen, Bent

    The present atlas has been developed within the NKS/NordRisk-II project "Nuclear risk from atmospheric dispersion in Northern Europe". The atlas describes risks from hypothetical long-range dispersion and deposition of radionuclides from 16 nuclear risk sites on the Northern Hemisphere...... spanning the climate variability associated with the North Atlantic Oscillation, and corresponding time evolution of the ensemble mean atmospheric dispersion....

  14. Constructing fine-granularity functional brain network atlases via deep convolutional autoencoder.

    Science.gov (United States)

    Zhao, Yu; Dong, Qinglin; Chen, Hanbo; Iraji, Armin; Li, Yujie; Makkie, Milad; Kou, Zhifeng; Liu, Tianming

    2017-12-01

    State-of-the-art functional brain network reconstruction methods such as independent component analysis (ICA) or sparse coding of whole-brain fMRI data can effectively infer many thousands of volumetric brain network maps from a large number of human brains. However, due to the variability of individual brain networks and the large scale of such networks needed for statistically meaningful group-level analysis, it is still a challenging and open problem to derive group-wise common networks as network atlases. Inspired by the superior spatial pattern description ability of the deep convolutional neural networks (CNNs), a novel deep 3D convolutional autoencoder (CAE) network is designed here to extract spatial brain network features effectively, based on which an Apache Spark enabled computational framework is developed for fast clustering of larger number of network maps into fine-granularity atlases. To evaluate this framework, 10 resting state networks (RSNs) were manually labeled from the sparsely decomposed networks of Human Connectome Project (HCP) fMRI data and 5275 network training samples were obtained, in total. Then the deep CAE models are trained by these functional networks' spatial maps, and the learned features are used to refine the original 10 RSNs into 17 network atlases that possess fine-granularity functional network patterns. Interestingly, it turned out that some manually mislabeled outliers in training networks can be corrected by the deep CAE derived features. More importantly, fine granularities of networks can be identified and they reveal unique network patterns specific to different brain task states. By further applying this method to a dataset of mild traumatic brain injury study, it shows that the technique can effectively identify abnormal small networks in brain injury patients in comparison with controls. In general, our work presents a promising deep learning and big data analysis solution for modeling functional connectomes, with

  15. ATLAS Distributed Computing Automation

    CERN Document Server

    Schovancova, J; The ATLAS collaboration; Borrego, C; Campana, S; Di Girolamo, A; Elmsheuser, J; Hejbal, J; Kouba, T; Legger, F; Magradze, E; Medrano Llamas, R; Negri, G; Rinaldi, L; Sciacca, G; Serfon, C; Van Der Ster, D C

    2012-01-01

    The ATLAS Experiment benefits from computing resources distributed worldwide at more than 100 WLCG sites. The ATLAS Grid sites provide over 100k CPU job slots, over 100 PB of storage space on disk or tape. Monitoring of status of such a complex infrastructure is essential. The ATLAS Grid infrastructure is monitored 24/7 by two teams of shifters distributed world-wide, by the ATLAS Distributed Computing experts, and by site administrators. In this paper we summarize automation efforts performed within the ATLAS Distributed Computing team in order to reduce manpower costs and improve the reliability of the system. Different aspects of the automation process are described: from the ATLAS Grid site topology provided by the ATLAS Grid Information System, via automatic site testing by the HammerCloud, to automatic exclusion from production or analysis activities.

  16. Construction and Performance of the ATLAS SCT Barrels and Cosmic Tests

    CERN Document Server

    Demirkoz, Bilge Melahat

    2007-01-01

    ATLAS is a multi-purpose detector for the LHC and will detect proton-proton collisions with center of mass energy of $14$TeV. Part of the central inner detector, the Semi-Conductor Tracker (SCT) barrels, were assembled and tested at Oxford University and later integrated at CERN with the TRT (Transition Radiation Tracker) barrel. The barrel SCT is composed of 4 layers of silicon strip modules with two sensor layers with $80 \\mu$m channel width. The design of the modules and the barrels has been optimized for low radiation length while maintaining mechanical stability, bringing services to the detector, and ensuring a cold and dry environment. The high granularity, high detector efficiency and low noise occupancy ($ < 5 \\times 10^{-4}$) of the SCT will enable ATLAS to have an efficient pattern recognition capability. Due to the binary nature of the SCT read-out, a stable read-out system and the calibration system is of critical importance. SctRodDaq is the online software framework for the calibration and a...

  17. Design and Construction of Large Size Micromegas Chambers for the ATLAS Upgrade of the Muon Spectrometer

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00380308; The ATLAS collaboration

    2016-01-01

    Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. A total surface area of about 150 m$^2$ of the forward regions (pseudo-rapidity coverage -- 1.3 $\\boldsymbol{< |\\eta| <}$ 2.7) of the Muon Spectrometer of the ATLAS detector at LHC will be equipped with 8-layer Micromegas modules. Each module extends over a surface from 2 to 3 m$^2$ for a total active area of 1200 m$^2$. Together with the small strip Thin Gap Chambers they will compose the two New Small Wheels (NSW), which will replace the innermost stations of the ATLAS endcap muon tracking system in the 2018/19 shutdown. In order to achieve a 15\\% transverse momentum resolution for 1 TeV muons, in addition to an excellent intrinsic position resolution, the mechanical precision of each plane of the assembled module must be $\\boldsymbol{30{\\mu}m}$ along the precision coordinate and $\\boldsymbol{80{\\mu}m}$ perpendicular to the chamber. All readout planes are segmented into strips with a pitch of $\\bold...

  18. Design and Construction of Large Size Micromegas Chambers for the ATLAS Upgrade of the Muon Spectrometer

    CERN Document Server

    Jeanneau, Fabien; The ATLAS collaboration

    2015-01-01

    Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. A total surface of about 150 m2 of the forward regions of the Muon Spectrometer of the ATLAS detector at LHC will be equipped with 8-layer Micromegas modules. Each module extends over a surface from 2 to 3 m2 for a total active area of 1200 m2. Together with the small strip Thin Gap Chambers they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS endcap muon tracking system in the 2018/19 shutdown. In order to achieve a 15% transverse momentum resolution for 1 TeV muons, in addition to an excellent intrinsic resolution, the mechanical precision of each plane of the assembled module must be as good as 30 μm along the precision coordinate and 80 μm perpendicular to the chamber. In the prototyping towards the final configuration two similar quadruplets with dimensions 1.2×0.5 m2 have been built with the same structure as foreseen for the NSW upgrade. It represents ...

  19. Design and Construction of Large Size Micromegas Chambers for the ATLAS Upgrade of the Muon Spectrometer

    CERN Document Server

    Jeanneau, Fabien; The ATLAS collaboration

    2015-01-01

    Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. A total surface of about 150 m2 of the forward regions of the Muon Spectrometer of the ATLAS detector at LHC will be equipped with 8-layer Micromegas modules. Each module extends over a surface from 2 to 3 m2 for a total active area of 1200 m2. Together with the small strip Thin Gap Chambers they will compose the two New Small Wheels, which will replace the innermost stations of the ATLAS endcap muon tracking system in the 2018/19 shutdown. In order to achieve a 15% transverse momentum resolution for 1 TeV muons, in addition to an excellent intrinsic resolution, the mechanical precision of each plane of the assembled module must be as good as 30 μm along the precision coordinate and 80 μm perpendicular to the chamber. All readout planes are segmented into strips with a pitch of 400 μm for a total of 4096 strips. In two of the four planes the strips are inclined by 1.5 ◦ and provide a measurement of the...

  20. Construction and Test of New Precision Drift-Tube Chambers for Upgrades of the ATLAS Muon Spectrometer in 2016/17

    CERN Document Server

    INSPIRE-00218480; Kortner, O.; Müller, F.; Nowak, S.; Schmidt-Sommerfeld, K.

    2016-01-01

    Small-diameter Muon Drift Tube (sMDT) chambers have been developed for the ATLAS muon detector upgrade. They possess an improved rate capability and a more compact design with respect to the existing chambers, which allows to equip detector regions uninstrument at present. The chamber assembly methods have been optimized for mass production, while the sense wire positioning accuracy is improved to below ten microns. The chambers will be ready for installation in the winter shutdown 2016/17 of the Large Hadron Collider. The design and construction of the new sMDT chambers for ATLAS will be discussed as well as measurements of their precision and performance.

  1. The ATLAS Computing Agora: a resource web site for citizen science projects

    CERN Document Server

    Bourdarios, Claire; The ATLAS collaboration

    2016-01-01

    The ATLAS collaboration has recently setup a number of citizen science projects which have a strong IT component and could not have been envisaged without the growth of general public computing resources and network connectivity: event simulation through volunteer computing, algorithms improvement via Machine Learning challenges, event display analysis on citizen science platforms, use of open data, etc. Most of the interactions with volunteers are handled through message boards, but specific outreach material was also developed, giving an enhanced visibility to the ATLAS software and computing techniques, challenges and community. In this talk the Atlas Computing Agora (ACA) web platform will be presented as well as some of the specific material developed for some of the projects.

  2. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  3. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Sustainable principles for siting, design and construction. [Reserved] 433.6 Section 433.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS... BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  4. Strategies for effective management of health and safety in confined site construction

    Directory of Open Access Journals (Sweden)

    John Spillane

    2013-12-01

    Full Text Available Purpose: The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. Design/Methodology/Approach: This is achieved by utilising individual interviews, focus groups discussion on selected case studies of confined construction sites, coupled with a questionnaire survey. Findings: The top five key strategies include (1 Employ safe system of work plans to mitigate personnel health and safety issues; (2 Inform personnel, before starting on-site, of the potential issues using site inductions; (3 Effective communication among site personnel; (4 Draft and implement an effective design site layout prior to starting on-site; and (5 Use of banksman (traffic co-ordinator to segregate personnel from vehicular traffic. Practical Implication: The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. Originality/Value: This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.

  5. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    Scott, D.E.; Pechmann, J.H.K.; Knox, J.N.; Estes, R.A.; McGregor, J.H.; Bailey, K.

    1988-12-01

    The Savannah River Ecology Laboratory has completed 10 years of ecological studies related to the construction of the Defense Waste Processing Facility (DWPF) on the Savannah River Site. This progress report examines water quality studies on streams peripheral to the DWPF construction site and examines the effectiveness of ''refuge ponds'' in ameliorating the effects of construction on local amphibians. Individual papers on these topics are indexed separately. 93 refs., 15 figs., 15 tabs

  6. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Scott, D.E.; Pechmann, J.H.K.; Knox, J.N.; Estes, R.A.; McGregor, J.H.; Bailey, K. (ed.)

    1988-12-01

    The Savannah River Ecology Laboratory has completed 10 years of ecological studies related to the construction of the Defense Waste Processing Facility (DWPF) on the Savannah River Site. This progress report examines water quality studies on streams peripheral to the DWPF construction site and examines the effectiveness of refuge ponds'' in ameliorating the effects of construction on local amphibians. Individual papers on these topics are indexed separately. 93 refs., 15 figs., 15 tabs. (MHB)

  7. Construction of Basic Evaluation Criteria for Candidate HLW Repository Sites (1)

    International Nuclear Information System (INIS)

    Koh, Yong Kwon; Bae, Dae Seok; Kim, Kyung Su; Kim, Geon Young; Park, Kyung Woo; Ji, Sung Hoon; Ryu, Ji Hun

    2009-08-01

    We constructed the preliminary site assessment system for selection of proper site as high level radioactive disposal repository with consideration of Korean geological characteristics and underground environments. And, site assessment factor and standard as a point of geologic aspect were suggested for decision of candidate radioactive disposal site in Korea. The results can be used to develop the geological information system for assessment of candidate disposal site

  8. Improving Site Management Practices in the Nigerian Construction ...

    African Journals Online (AJOL)

    Site management involves a combination of activities, which turn basic resources into a finished product. The effectiveness of managing production process cannot be economically attained by force, but requires the creation of conditions that will encourage self-motivation and bring about team spirit that is important to an ...

  9. Utilisation of employee assistance programme to reduce absenteeism on construction sites

    OpenAIRE

    2013-01-01

    M.Tech (Construction Management) Many construction companies are beginning to realize the value of their employees. Employees are to a large extent the engine of the organisation. Todays employees are under a lot of pressure and stress from home and at the construction sites. The construction industry just like any other industry, is faced with the challenges of dealing with personal as well as work related problems. These problems they have effect on job performance. An Employee assistanc...

  10. AN ASSESSMENT OF FACTORS AFFECTING MATERIAL STOCK CONTROL PRACTICE ON SELECTED CONSTRUCTION SITES IN NIGERIA

    OpenAIRE

    Adafin, Johnson Kayode; Ayodele, Elijah Olusegun; Daramola, Olufemi

    2011-01-01

    This research examines the stock control methods utilized by construction firms on construction sites with a view to assessing the factors affecting material stock control practice by construction firms as well as determining the impact of factors affecting material stock control on building project performance. Data were collected with the aid of well-structured questionnaire administered on a number of construction professionals and technicians in some randomly selected building constructio...

  11. A prototype of one of the eight sections that will form one of the big-wheels of the ATLAS muon spectrometer has been installed in building 887 at Prévessin . Over 40 institutes in 11 countries are involved in the construction of the ATLAS muon spectrometer.

    CERN Multimedia

    Patrice Loïez

    2001-01-01

    A prototype of one of the eight sections that will form one of the big-wheels of the ATLAS muon spectrometer has been installed in building 887 at Prévessin . Over 40 institutes in 11 countries are involved in the construction of the ATLAS muon spectrometer.

  12. New Reactor Siting, Licensing and Construction Experience. Proceedings of the 2. CNRA International Workshop on 'New Reactor Siting, Licensing and Construction Experience'

    International Nuclear Information System (INIS)

    2013-01-01

    This report documents the proceedings from the 2. Workshop on New Reactor Siting, Licensing and Construction Experience. A total of 45 specialists from 16 countries and international organisations attended. The meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the US Nuclear Regulatory Commission (U.S.NRC). The objectives of the workshop were to provide a forum to exchange information on lessons learned from siting, licensing and constructing new nuclear power plants around the world. Key focus areas included siting practices and regulatory positions that have been enhanced as a result of the Fukushima accident; lessons learned from licensing and design review approaches and challenges, construction experience and recommendations for regulatory oversight; and regulatory cooperation on generic and design specific issues through the MDEP specific working groups. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to regulatory cooperation on generic and design specific issues, MDEP working groups (EPR, AP1000), vendor inspection co-operation, digital I and C, and codes and standards. The second technical session was intended to discuss and share regulatory positions on siting practices and enhancements as a result of lessons learned from Fukushima accident. The third technical session addressed the construction experience and regulatory oversight of new reactor construction activities. And the fourth technical session included presentations on the lessons learned from regulatory licensing reviews of new reactor designs

  13. Construction and Test of Full-Size Micromegas Modules for the ATLAS New Small Wheel Upgrade

    CERN Document Server

    Bortfeldt, Jonathan; The ATLAS collaboration

    2015-01-01

    In 2015 the first full size resistive-strip MicroMegas operational modules for the ATLAS New Small Wheel upgrade will be realized. The goal is to provide precision muon tracking with spatial resolution below 100 μm on trapezoidal detector areas between 2 and 3 m^2. The overall thickness of each detector modules is about 70 mm and the total number of read-out channels is of the order of 10^4. Each module consists of a quadruplet of four MicroMegas with 5 mm drift gaps intervaled with 2 read-out panels with anodes on both sides and 3 drift panels. The panels are realized as 11 mm thick stiffening sandwiches made of 10 mm thick honeycomb, 0.5 mm thick FR4 pcb material sheets as surfaces and aluminium frames. The active part of the read-out anodes consists of horizontal strips with 0.45 mm pitch. Two out of the four anode planes are built with stereo strips of identical pitch and stereo angles of ±1.5 degrees. A sequence of 128 μm height insulating pillars on the read-out planes allows the pretensioned microme...

  14. Construction of an end-cap module prototype for the ATLAS transition radiation tracker

    CERN Document Server

    Danielsson, H

    2000-01-01

    We have designed, built and tested an 8-plane module prototype for the end-cap of the ATLAS TRT (Transition Radiation Tracker). The overall mechanics as well as the detailed design of individual components are presented. The prototype contains over 6000 straw tubes with a diameter of 4 mm, filled with an active gas mixture of 70% Xe, 20% CF4 and 10% CO//2. Very tight requirements on radiation hardness (10 Mrad and 2 multiplied by l0**1**4 neutrons per cm**2) straw straightness (sagitta less than 300 m), wire positions and leak tightness put great demands upon design and assembly. In order to verify the design, the stability of the wire tension, straw straightness, high-voltage performance and total leak rate have been measured and the results are presented. Some examples of dedicated assembly tooling and testing procedures are also given. Finally, the results of the calculations and measurements of both mechanical behaviour and wire offset are presented. 6 Refs.

  15. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Pechmann, J.H.K.; Scott, D.E.; McGregor, J.H.; Estes, R.A.; Chazal, A.C.

    1993-02-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980's. The Savannah River Ecology Laboratory (SREL) has completed 12 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of refuge ponds'' as alternative breeding sites for amphibians that formerly bred at Sun Bay Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10CFR1022).

  16. Environmental Assessment for the construction and operation of the Health Physics Site Support Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    1995-07-01

    DOE has prepared an environmental assessment for the proposed construction and operation of the Health Physics Site Support Facility on the Savannah River Site. This (new) facility would meet requirements of the site radiological protection program and would ensure site compliance with regulations. It was determined that the proposed action is not a major Federal action significantly affecting the quality of the environment within the meaning of NEPA. Therefore, a finding of no significant impact is made, and no environmental impact statement is needed

  17. Evaluation of polynomial image deformation for matching of 3D- abdominal MR-images using anatomical landmarks and for atlas construction

    CERN Document Server

    Kimiaei, S; Jonsson, E; Crafoord, J; Maguire, G Q

    1999-01-01

    The aim of this study is to compare and evaluate the potential usability of linear and non-linear (polynomial) 3D-warping for constructing an atlas by matching abdominal MR-images from a number of different individuals using manually picked anatomical landmarks. The significance of this study lies in the fact that it illustrates the potential to use polynomial matching at a local or organ level. This is a necessary requirement for constructing an atlas and for fine intra-patient image matching and fusion. Finally 3D-image warping using anatomical landmark for inter-patient intra-modality image co-registration and fusion was found to be a very powerful and robust method. Additionally it can be used for intra-patient inter- modality image matching.

  18. Critical management practices influencing on-site waste minimization in construction projects.

    Science.gov (United States)

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. A Study Identifying Causes of Construction Waste Production and Applying Safety Management on Construction Site

    Directory of Open Access Journals (Sweden)

    Ali Asghar Najafpoor

    2014-09-01

    Full Text Available Background and purpose: In a recent century, the amount of construction waste has increased significantly. Although the building industry has a considerable role in the development of a society, it is regarded as an environmentally destructive. Source reduction is the highest goal in the waste management hierarchy and is in priority. It also has economic benefits by reducing costs associated with transportation, disposal or recycling of wastes. The present study is aimed to identify activities generating the wastes in design, transportation and storage and procurement of building materials. Materials and Methods: This was questionnaire survey. A total of 94 professionals in the construction industry were attended in this study. To determine the validity and reliability of the instrument, content validity method and Cronbach’s alpha coefficient (0.79 were used. Data were analyzed using SPSS for Windows. Frequencies, percentage, mean and standard deviation were determined in this research. Results: The results showed that handling and storage have been chosen as the most causative factor of waste production in construction activity. Improper material storage was identified major factor in producing waste in handling and storage phase. Usage of low-quality material in design stage and material price changes in procurement were recognized as major causes of waste production in these stages. Conclusion: All studied phases in this research were identified as causative factors in producing of waste. Identifying causes of construction waste production will help us decide better how to control this sort of wastes.

  20. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  1. 75 FR 69470 - Tele Atlas North America, Inc., Currently Doing Business as Tom Tom Including Off-Site Workers...

    Science.gov (United States)

    2010-11-12

    ...,839B; TA-W-70,839C] Tele Atlas North America, Inc., Currently Doing Business as Tom Tom Including Off... Business as Tom Tom, Concord, MA; Tele Atlas North America, Inc. Currently Doing Business as Tom Tom, Detroit, MI; Tele Atlas North America, Inc. Currently Doing Business as Tom Tom, Redwood, CA; Amended...

  2. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    OpenAIRE

    Spillane, John P; Oyedele, Lukumon O; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E; Tijani, Iyabo K

    2011-01-01

    The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues...

  3. A study on air pollution concentration at Desa parkcity construction site

    African Journals Online (AJOL)

    This study assesses the effect of construction workers exposure towards the air pollution to the correlation between meteorological factor with the particulate matter and other gases concentration at a construction site in DesaParkcity. The concentration of PM was collected by using low volume sampler meanwhile CO, CO2, ...

  4. Occupational health and safety in the Moroccan construction sites: preliminary diagnosis

    Science.gov (United States)

    Tarik, Bakeli; Adil, Hafidi Alaoui

    2018-05-01

    Managing occupational health and safety on Moroccan construction sector represents the first step for projects' success. In fact, by avoiding accidents, all the related direct and indirect costs and delays can be prevented. That leads to an important question always asked by any project manager: what are the factors responsible for accidents? How can they be avoided? Through this research, the aim is to go through these questions, to contribute in occupational health and safety principles understanding, to identify construction accidentology and risk management opportunities and to approach the case of Moroccan construction sites by an accurate diagnosis. The approach is to make researchers, managers, stakeholders and deciders aware about the criticality of construction sites health and safety situation. And, to do the first step for a scientific research project in relation with health and safety in the Moroccan construction sector. For this, the paper will study the related state of art namely about construction sites accidents causation, and will focus on Reason's `Swiss cheese' model and its utilization for Moroccan construction sites health and safety diagnosis. The research will end with an estimation of an accidents fatality rate in the Moroccan construction sector and a benchmarking with the international rates. Finally, conclusions will be presented about the necessity of Occupational Health and Safety Management System (OHSMS) implementation, which shall cover all risk levels, and insure, at the same time, that the necessary defenses against accidents are on place.

  5. Construction and performance of the sTGC and MicroMegas chambers for ATLAS NSW upgrade

    Science.gov (United States)

    Sekhniaidze, G.

    2017-03-01

    The innermost stations of the current ATLAS muon end-cap system, the Small Wheels, must be upgraded in 2019 to retain their good precision tracking and trigger capabilities in the high background environment expected with the upcoming luminosity increase of the LHC. The New Small Wheels (NSW) will employ two chamber technologies: eight layers of MicroMegas (MM) arranged in two quadruplets, sandwiched between two quadruplets of small-strip Thin Gap Chambers (sTGC) for a total of about 2400 m2 of detection planes. All quadruplets have trapezoidal shapes with surface areas between 1 and 3 m2. Both MM and sTGC systems will independently provide trigger and tracking capabilities. The readout boards are industrially produced for both technologies and an accurate quality control is needed. In order to achieve a 15% transverse momentum resolution for 1 TeV muons, in addition to an excellent intrinsic resolution (010 μm), the mechanical precision of each plane of the assembled modules must be as good as 30 μm along the precision coordinate and 80 μm perpendicular to the chamber. In 2016 the milestone to build the first module-0 prototypes for both technologies has been reached. The construction procedure of the module-0 detectors will be reviewed, along with the results of the quality control checks performed during construction. The module-0 have been measured and subjected to a thorough validation. Results obtained with high-energy particle beams, with cosmic rays and with X-rays will be presented.

  6. Signal formation processes in Micromegas detectors and quality control for large size detector construction for the ATLAS new small wheel

    Energy Technology Data Exchange (ETDEWEB)

    Kuger, Fabian

    2017-07-31

    The Micromegas technology is one of the most successful modern gaseous detector concepts and widely utilized in nuclear and particle physics experiments. Twenty years of R and D rendered the technology sufficiently mature to be selected as precision tracking detector for the New Small Wheel (NSW) upgrade of the ATLAS Muon spectrometer. This will be the first large scale application of Micromegas in one of the major LHC experiments. However, many of the fundamental microscopic processes in these gaseous detectors are still not fully understood and studies on several detector aspects, like the micromesh geometry, have never been addressed systematically. The studies on signal formation in Micromegas, presented in the first part of this thesis, focuses on the microscopic signal electron loss mechanisms and the amplification processes in electron gas interaction. Based on a detailed model of detector parameter dependencies, these processes are scrutinized in an iterating comparison between experimental results, theory prediction of the macroscopic observables and process simulation on the microscopic level. Utilizing the specialized detectors developed in the scope of this thesis as well as refined simulation algorithms, an unprecedented level of accuracy in the description of the microscopic processes is reached, deepening the understanding of the fundamental process in gaseous detectors. The second part is dedicated to the challenges arising with the large scale Micromegas production for the ATLAS NSW. A selection of technological choices, partially influenced or determined by the herein presented studies, are discussed alongside a final report on two production related tasks addressing the detectors' core components: For the industrial production of resistive anode PCBs a detailed quality control (QC) and quality assurance (QA) scheme as well as the therefore required testing tools have been developed. In parallel the study on micromesh parameter optimization

  7. Signal formation processes in Micromegas detectors and quality control for large size detector construction for the ATLAS new small wheel

    International Nuclear Information System (INIS)

    Kuger, Fabian

    2017-01-01

    The Micromegas technology is one of the most successful modern gaseous detector concepts and widely utilized in nuclear and particle physics experiments. Twenty years of R and D rendered the technology sufficiently mature to be selected as precision tracking detector for the New Small Wheel (NSW) upgrade of the ATLAS Muon spectrometer. This will be the first large scale application of Micromegas in one of the major LHC experiments. However, many of the fundamental microscopic processes in these gaseous detectors are still not fully understood and studies on several detector aspects, like the micromesh geometry, have never been addressed systematically. The studies on signal formation in Micromegas, presented in the first part of this thesis, focuses on the microscopic signal electron loss mechanisms and the amplification processes in electron gas interaction. Based on a detailed model of detector parameter dependencies, these processes are scrutinized in an iterating comparison between experimental results, theory prediction of the macroscopic observables and process simulation on the microscopic level. Utilizing the specialized detectors developed in the scope of this thesis as well as refined simulation algorithms, an unprecedented level of accuracy in the description of the microscopic processes is reached, deepening the understanding of the fundamental process in gaseous detectors. The second part is dedicated to the challenges arising with the large scale Micromegas production for the ATLAS NSW. A selection of technological choices, partially influenced or determined by the herein presented studies, are discussed alongside a final report on two production related tasks addressing the detectors' core components: For the industrial production of resistive anode PCBs a detailed quality control (QC) and quality assurance (QA) scheme as well as the therefore required testing tools have been developed. In parallel the study on micromesh parameter optimization

  8. Design and construction of Micromegas detectors for the ATLAS Muon Spectrometer Upgrade

    CERN Document Server

    Sessa, Marco

    2016-01-01

    Thanks to significant technological improvements, developed during a intensive R&D; activity carried out in the last years, large-area Micromegas (MM) will be employed, for the first time, in the High Energy Physics field. Starting from 2019, they will cover a large surface of about 150m2 in the forward regions of the Muon Spectrometer. In this paper, the performances of MM chambers and, in particular, the spatial resolution and the efficiency, obtained using data from different test beam campaigns, will be described. Moreover, it will be shown the present status of the Micromegas chambers construction from the Italian INFN groups, focusing, especially, on the construction procedures and the methodologies developed to obtain the challenging required mechanical precision.

  9. NKS NordRisk. Atlas of long-range atmospheric dispersion and deposition of radionuclides from selected risk sites in the Northern Hemisphere

    International Nuclear Information System (INIS)

    Havskov Soerensen, J.; Baklanov, A.; Mahura, A.; Lauritzen, Bent; Mikkelsen, Torben

    2008-07-01

    Within the NKS NordRisk project, 'Nuclear risk from atmospheric dispersion in Northern Europe', the NKS NordRisk Atlas has been developed. The atlas describes risks from hypothetical long-range atmospheric dispersion and deposition of radionuclides from selected nuclear risk sites in the Northern Hemisphere. A number of case studies of long-term long-range atmospheric transport and deposition of radionuclides has been developed, based on two years of meteorological data. Radionuclide concentrations in air and radionuclide depositions have been evaluated and examples of long-term averages of the dispersion and deposition and of the variability around these mean values are provided. (au)

  10. NKS NordRisk. Atlas of long-range atmospheric dispersion and deposition of radionuclides from selected risk sites in the Northern Hemisphere

    Energy Technology Data Exchange (ETDEWEB)

    Havskov Soerensen, J.; Baklanov, A.; Mahura, A. (Danish Meteorological Institute, Copenhagen (Denmark)); Lauritzen, Bent; Mikkelsen, Torben (Technical Univ. of Denmark, Risoe National Lab. for Sustainable Energy, Roskilde (Denmark))

    2008-07-15

    Within the NKS NordRisk project, 'Nuclear risk from atmospheric dispersion in Northern Europe', the NKS NordRisk Atlas has been developed. The atlas describes risks from hypothetical long-range atmospheric dispersion and deposition of radionuclides from selected nuclear risk sites in the Northern Hemisphere. A number of case studies of long-term long-range atmospheric transport and deposition of radionuclides has been developed, based on two years of meteorological data. Radionuclide concentrations in air and radionuclide depositions have been evaluated and examples of long-term averages of the dispersion and deposition and of the variability around these mean values are provided. (au)

  11. Memory handling in the ATLAS submission system from job definition to sites limits

    CERN Document Server

    Forti, Alessandra; The ATLAS collaboration

    2016-01-01

    The ATLAS workload management system is a pilot system based on a late binding philosophy that avoided for many years to pass fine grained job requirements to the batch system. In particular for memory most of the requirements were set to request 4GB vmem as defined in the EGI portal VO card, i.e. 2GB RAM + 2GB swap. However in the past few years several changes have happened in the operating system kernel and in the applications that make such a definition of memory to use for requesting slots obsolete and ATLAS has introduced the new PRODSYS2 workload management which has a more flexible system to evaluate the memory requirements and to submit to appropriate queues. The work stemmed in particular from the introduction of 64bit multicore workloads and the increased memory requirements of some of the single core applications. This paper describes the overall review and changes of memory handling starting from the definition of tasks, the way tasks memory requirements are set using scout jobs and the new memor...

  12. Marketing Research of Construction Sites based on ABC-XYZ Analysis and Relational Data

    Directory of Open Access Journals (Sweden)

    Konikov Aleksandr

    2017-01-01

    Full Text Available ABC-XYZ analysis is well known in marketing. It allows identifying sites that yield maximum profits when sold, sites that enjoy stable demand, or sites have both qualities specified above. However, the methods are quite abstract and are not designed to study specific factors that impact the results of ABC-XYZ analysis. Meanwhile, for some applications, particularly for marketing research of construction sites, it is critical not only to identify high-profit and stable sites but also to find out what combination of technical parameters, factors related to their location, transport accessibility, etc. are typical of them. This work suggests an approach to address the issue.

  13. NKS NordRisk II: Atlas of long-range atmospheric dispersion and deposition of radionuclides from selected risk sites in the Northern Hemisphere

    International Nuclear Information System (INIS)

    Smith Korsholm, U.; Havskov Soerensen, J.; Astrup, P.; Lauritzen, B.

    2011-04-01

    The present atlas has been developed within the NKS/NordRisk-II project 'Nuclear risk from atmospheric dispersion in Northern Europe'. The atlas describes risks from hypothetical long-range dispersion and deposition of radionuclides from 16 nuclear risk sites on the Northern Hemisphere. The atmospheric dispersion model calculations cover a period of 30 days following each release to ensure almost complete deposition of the dispersed material. The atlas contains maps showing the total deposition and time-integrated air concentration of Cs-137 and I-131 based on three years of meteorological data spanning the climate variability associated with the North Atlantic Oscillation, and corresponding time evolution of the ensemble mean atmospheric dispersion. (Author)

  14. NKS NordRisk II: Atlas of long-range atmospheric dispersion and deposition of radionuclides from selected risk sites in the Northern Hemisphere

    Energy Technology Data Exchange (ETDEWEB)

    Smith Korsholm, U.; Havskov Soerensen, J. (Danish Meteorological Institute (DMI), Copenhagen (Denmark)); Astrup, P.; Lauritzen, B. (Technical Univ. of Denmark, Risoe National Lab. for Sustainable Energy. Radiation Research Div., Roskilde (Denmark))

    2011-04-15

    The present atlas has been developed within the NKS/NordRisk-II project 'Nuclear risk from atmospheric dispersion in Northern Europe'. The atlas describes risks from hypothetical long-range dispersion and deposition of radionuclides from 16 nuclear risk sites on the Northern Hemisphere. The atmospheric dispersion model calculations cover a period of 30 days following each release to ensure almost complete deposition of the dispersed material. The atlas contains maps showing the total deposition and time-integrated air concentration of Cs-137 and I-131 based on three years of meteorological data spanning the climate variability associated with the North Atlantic Oscillation, and corresponding time evolution of the ensemble mean atmospheric dispersion. (Author)

  15. Developing a system dynamics model to analyse environmental problem in construction site

    Science.gov (United States)

    Haron, Fatin Fasehah; Hawari, Nurul Nazihah

    2017-11-01

    This study aims to develop a system dynamics model at a construction site to analyse the impact of environmental problem. Construction sites may cause damages to the environment, and interference in the daily lives of residents. A proper environmental management system must be used to reduce pollution, enhance bio-diversity, conserve water, respect people and their local environment, measure performance and set targets for the environment and sustainability. This study investigates the damaging impact normally occur during the construction stage. Environmental problem will cause costly mistake in project implementation, either because of the environmental damages that are likely to arise during project implementation, or because of modification that may be required subsequently in order to make the action environmentally acceptable. Thus, findings from this study has helped in significantly reducing the damaging impact towards environment, and improve the environmental management system performance at construction site.

  16. Assumption and program of the earlier stage construction of L/ILW disposal site

    International Nuclear Information System (INIS)

    Li Xuequn; Chen Shi; Li Xinbang

    1993-01-01

    The authors analysed the production and treatment of low- and intermediate-level radwastes (L/ILW) in China. Some problems and situation in this field are introduced. Over the past ten years, preliminary efforts have been made by CNNC (China National Nuclear Corporation) in policy, law and rules, developing program, management system, siting, engineering techniques, and safety assessment for radwaste disposal. The investment of the earlier stage work of L/ILW disposal site construction is estimated, the program and assumption to disposal site construction of the L/ILW are reviewed

  17. Construction quality assurance for Pit 6 landfill closure, Lawrence Livermore National Laboratory, Site 300

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-30

    Golder Construction Services, Inc. (GCS), under contract to the Regents of the University of California, Lawrence Livermore National Laboratory (LLNL), provided the construction quality assurance (CQA) observation and testing during the construction of the Site 300, Pit 6 landfill closure cover. The cap construction was performed as a CERCLA non-time-critical removal action from June 2 to August 29, 1997. the project site is located 18 miles east of Livermore on Tesla Road and approximately 10 miles southwest of Tracy on Corral Hollow Road in San Joaquin County, California. This report certifies that the LLNL, Site 300, Pit 6, Landfill Closure was constructed in accordance with the construction specifications and design drawings. This report documents construction activities and CQA monitoring and testing for construction of the Pit 6 Landfill Closure. Golder Associates, Inc. of Oakland, California was the design engineering firm responsible for preparation of the drawings and specifications. CQA services were provided by GCS, of Roseville, California, under supervision of a California registered civil Engineer.

  18. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    International Nuclear Information System (INIS)

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development

  19. Technical Site Information: Planning group of the Directorate and Conventional Construction Division

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This document presents the technical site information for the Superconducting Super Collider project. The Ellis County, Texas site was selected by the Department of Energy in 1989. After assembling the initial staff at temporary facilities in Dallas, the SSC Laboratory began site-specific design work. The resulting design for the SSC accelerators, experimental areas, and laboratory facilities were described in the Site-Specific Conceptual Design Report of July 1990. Since then, design specifications for the technical components and conventional facilities have been formulated. In fact, a very significant amount of surface and underground construction has been initiated and many buildings have been completed. Testing of prototypes for most technical components is advanced. The construction phase of the SSC project is approximately 20% complete. At this time, it is appropriate to capture the conventional design work which has taken place since 1990. This documents records regional and physical information used in site studies, summarizes the site studies for conventional facilities, and presents site layouts for buildings and utilities as they would have been at the end of the construction project. As such, this documents summarizes and complements the work of many groups in the SSC laboratory, the Texas National Research Laboratory Commission (TNRLC), and several subcontractors to the SSC project. The document contains extensive references to their work contained in other drafts and final reports. In particular, it borrows heavily from the Site Development Plan (released in draft form in January, 1992) which has, to date, guided aspects of site development.

  20. The occupational safety on the construction sites of the farm production buildings in Finland

    Directory of Open Access Journals (Sweden)

    M. Hellstedt

    2013-09-01

    Full Text Available The size of farms has increased considerably during Finland's EU membership. The growth has meant big investments in the new production buildings. The buildings have been switched to big industrialhall- like constructions from small-scale ones which have contained own timber and own work contribution. The objective of the project financed by Farmers' Social Insurance Institution was to improve occupational safety on farm building construction and renovation sites by disseminating current safety practices and by developing ways of action which are better than the prevailing ones. The project consisted of a literature review, statistical analysis, as well as a farmer and designer interviews. In the statistical analysis the MATA occupational injuries insurance claims database on farmers’ claims during construction and renovation work for the years 2005 - 2008 was compared with the register of Federation of Accident Insurance Institutions on the construction workers' injuries. In comparing the reasons of the accidents a clear difference was found; poor scaffoldings and ladders are still the main culprits on farm accidents. Farmer interviews were used to assess occupational safety measures on the construction site, occurred injuries and their types, nearmiss situations and the underlying factors which have led to the injuries. Also construction safety deficiencies as well as the direct and indirect costs caused for instance because of the delay in completion of construction project were discussed. Designer interviews aimed to find out how occupational safety and health considerations are taken into account in farm building planning and counseling, and how this experience of the designers should be utilized in order to improve safety at the construction sites on farms. Farmers knew their obligations on occupational safety poorly. The situation was further worsened by the fact that on the site the supervisor tasks were only nominally executed. The

  1. Childhood leukaemia and non-Hodgkin's lymphoma near large rural construction sites, with a comparison with Sellafield nuclear site

    International Nuclear Information System (INIS)

    Kinlen, L.J.; Dickson, M.; Stiller, C.A.

    1995-01-01

    The objective was to determine whether population mixing produced by large, non-nuclear construction projects in rural areas is associated with an increase in childhood leukaemia and non-Hodgkin's lymphoma. A study was undertaken of the incidence of leukaemia and non-Hodgkin's lymphoma among children living near large construction projects in Britain since 1945, situated more than 20 km from a population centre, involving a workforce of more than 1000, and built over three or more calendar years. A 37% excess of leukaemia and non-Hodgkin's lymphoma at 0-14 years of age was recorded during construction and the following calendar year. The excesses were greater at times when construction workers and operating staff overlapped (72%), particularly in areas of relatively high social class. For several sites the excesses were similar to or greater than that near the nuclear site of Sellafield (67%), which is distinctive in its large workforce with many construction workers. Seascale, near Sellafield, with a ninefold increase had an unusually high proportion of residents in social class I. The findings support the infection hypothesis and reinforce the view that the excess of childhood leukaemia and non-Hodgkin's lymphoma near Sellafield has a similar explanation. (author)

  2. Unit soil loss rate from various construction sites during a storm.

    Science.gov (United States)

    Maniquiz, Marla C; Lee, Soyoung; Lee, Eunju; Kong, Dong-Soo; Kim, Lee-Hyung

    2009-01-01

    The Korean Ministry of Environment (MOE) opts to establish an ordinance having a standard specifying an allowable soil loss rate applicable to construction projects. The predicted amount of soil loss from a construction site exceeding the standard can be used to calculate the percent reduction necessary to comply with the ordinance. This research was conducted to provide a basis to establish a standard by investigating the unit soil loss rates in the three phases of development: pre-construction, active construction and post construction based from 1,036 Environmental Impact Assessment (EIA) reports within the six-year period (2000-2005). Based on the findings, several factors affect the magnitude of soil loss rates particularly storm characteristics, site slope, soil type, location from rivers, as well as the type of construction activity. In general, the unit soil loss rates during the active construction phase are extremely higher in comparison to undisturbed areas; in magnitude of 7 to 80 times larger in urban areas and 18 to 585 times in rural areas. Only between 20 to 40 percent of the soil loss rates was contributed at pre- and post- construction phases indicating that the active construction phase is the most important phase to control.

  3. Site infrastructure as required during the construction and erection of nuclear power plants

    International Nuclear Information System (INIS)

    Haas, K.F.; Wagner, H.

    1978-01-01

    In general, in an exchange of experience on constructing nuclear power plants priority is given to design and lay-out, financing, quality assurance etc., but in this paper an attempt has been made to describe range and type of site infrastructure required during construction and erection. Site infrastructure will make considerable demands on the planning, supply of material and maintenance that may result from the frequently very isolated location of power plant sites. Examples for specific values and experiences are given for a nuclear power plant with two units on the 1300-MW type at present under construction of the Persian Gulf in Iran. Data concerning the site infrastructure, including examples, are given and explained on the basis of graphs. The site is split up into a technical and a social infrastructure. The main concern of the technical site infrastructure is the timely provision and continuous availability of electric energy, water, communication grids, workshops, warehouses, offices, transport and handling facilities, as well as the provision of heavy load roads, harbour facilities, etc. The social site infrastructure in general comprises accommodation, food supplies and the care and welfare of all site personnel, which includes a hospital, school, self-service shop, and sport and recreation facilities. (author)

  4. Study of relationship between time overrun and productivity on construction sites

    Directory of Open Access Journals (Sweden)

    Ameh, Oko John

    2011-12-01

    Full Text Available The history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. In an attempt to reverse this trend, this study aims at establishing the relationship between time overrun and labour productivity on construction sites in Lagos, Nigeria. 43 technical and management staff of some medium and large construction firms based in Lagos, Nigeria were sampled and administered a questionnaire survey. The questionnaire contained 18 causes of project time overrun and 14 causes of low labour productivity which had been identified from the literature reviewed. With these a relationship between project time overrun and low labour productivity was established. Both descriptive and inferential statistics were used in analyzing the data. Results indicate that inadequate funds for the project, inadequate planning before project takeoff, inadequate tools and equipment and delay in delivery of material top the list of major causes of time overrun while the use of wrong construction methods, inadequate construction materials and inaccurate drawing/specification are the key factors causing low labour productivity on construction sites. Significant negative relationship was found between time overrun and labour productivity in construction sites in Nigeria. The study concludes by recommending that early appointment of project managers could ensure proper management of both the human and material resources that could guarantee improved productivity and ultimately save projects from time overrun.

  5. Modeling injury rates as a function of industrialized versus on-site construction techniques.

    Science.gov (United States)

    Rubio-Romero, J C; Suárez-Cebador, M; Abad, Jesús

    2014-05-01

    It is often predicted that the industrialization of building activities will lead to a reduction of accident rates in the construction sector, particularly as a result of switching activities from building sites to factories. However, to date no scientific research has provided objective quantitative results to back up this claim. The aim of this paper is to evaluate how industrialization affects the accident rate in different industrialized building systems in Spain. Our results revealed that the industrialized steel modular system presents the lowest accident rate, while the highest accident rate was recorded in the construction method with cast-in-place concrete. The lightweight construction system also presents a high accident rate. Accordingly, industrialized building systems cannot claim to be safer than traditional ones. The different types of "on-site work" seem to be the main variable which would explain the accident rates recorded in industrialized construction systems. Copyright © 2014 Elsevier Ltd. All rights reserved.

  6. Smooth Operator - Mobile Information Technology for Improved Flow at the Construction Site

    DEFF Research Database (Denmark)

    Tambo, Torben

    2010-01-01

    is used; mobility is classified as remote, local or micro. Furthermore an extensive literature study is employed along with both market screening for systems and case studies of companies adopting as well as rejecting the technology. Both within research communities, software manufacturers......Mobile information technology (IT) seems an ideal innovation to promote effectiveness of the construction process, particularly at the construction site; research has over the last 15 years focused on solutions, potentials and barriers with this field. This paper aim at the duality between research...... and industry for an updated and forward looking comprehension, and view of tendencies, of the roles and potentials of mobile IT at the construction site including potential for further research. Qualitative and interpretive methodology inspired by information systems and sociology of research and construction...

  7. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    Directory of Open Access Journals (Sweden)

    Spillane, John P

    2011-12-01

    Full Text Available The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

  8. VM-based infrastructure for simulating different cluster and storage solutions used on ATLAS Tier-3 sites

    International Nuclear Information System (INIS)

    Belov, S; Kadochnikov, I; Korenkov, V; Kutouski, M; Oleynik, D; Petrosyan, A

    2012-01-01

    The current ATLAS Tier-3 infrastructure consists of a variety of sites of different sizes and with a mix of local resource management systems (LRMS) and mass storage system (MSS) implementations. The Tier-3 monitoring suite, having been developed in order to satisfy the needs of Tier-3 site administrators and to aggregate Tier-3 monitoring information on the global VO level, needs to be validated for various combinations of LRMS and MSS solutions along with the corresponding Ganglia plugins. For this purpose the testbed infrastructure, which allows simulation of various computational cluster and storage solutions, had been set up at JINR (Dubna, Russia). This infrastructure provides the ability to run testbeds with various LRMS and MSS implementations, and with the capability to quickly redeploy particular testbeds or their components. Performance of specific components is not a critical issue for development and validation, whereas easy management and deployment are crucial. Therefore virtual machines were chosen for implementation of the validation infrastructure which, though initially developed for Tier-3 monitoring project, can be exploited for other purposes. Load generators for simulation of the computing activities at the farm were developed as a part of this task. The paper will cover concrete implementation, including deployment scenarios, hypervisor details and load simulators.

  9. Prototype Environmental Assessment of the impacts of siting and construction of an SPS ground receiving station

    Science.gov (United States)

    Hill, J.

    1980-01-01

    A prototype assessment of the environmental impacts of siting and constructing a Satellite Power System (SPS) Ground Receiving Station (GRS) is reported. The objectives of the study were: (1) to develop an assessment of the nonmicrowave related impacts of the reference system SPS GRS on the natural environment; (2) to assess the impacts of GRS construction and operations in the context of actual baseline data for a site in the California desert; and (3) to identify critical GRS characteristics or parameters that are most significant in terms of the natural environment.

  10. Safety leadership at construction sites: the importance of rule-oriented and participative leadership.

    Science.gov (United States)

    Grill, Martin; Pousette, Anders; Nielsen, Kent; Grytnes, Regine; Törner, Marianne

    2017-07-01

    Objectives The construction industry accounted for >20% of all fatal occupational accidents in Europe in 2014. Leadership is an essential antecedent to occupational safety. The aim of the present study was to assess the influence of transformational, active transactional, rule-oriented, participative, and laissez-faire leadership on safety climate, safety behavior, and accidents in the Swedish and Danish construction industry. Sweden and Denmark are similar countries but have a large difference in occupational accidents rates. Methods A questionnaire study was conducted among a random sample of construction workers in both countries: 811 construction workers from 85 sites responded, resulting in site and individual response rates of 73% and 64%, respectively. Results The results indicated that transformational, active transactional, rule-oriented and participative leadership predict positive safety outcomes, and laissez-faire leadership predict negative safety outcomes. For example, rule-oriented leadership predicts a superior safety climate (β=0.40, Pleadership on workers' safety behavior was moderated by the level of participative leadership (β=0.10, Pleadership behaviors on safety outcomes were largely similar in Sweden and Denmark. Rule-oriented and participative leadership were more common in the Swedish than Danish construction industry, which may partly explain the difference in occupational accident rates. Conclusions Applying less laissez-faire leadership and more transformational, active transactional, participative and rule-oriented leadership appears to be an effective way for construction site managers to improve occupational safety in the industry.

  11. Selection of nest-site habitat by interior least terns in relation to sandbar construction

    Science.gov (United States)

    Sherfy, Mark H.; Stucker, Jennifer H.; Buhl, Deborah A.

    2012-01-01

    Federally endangered interior least terns (Sternula antillarum) nest on bare or sparsely vegetated sandbars on midcontinent river systems. Loss of nesting habitat has been implicated as a cause of population declines, and managing these habitats is a major initiative in population recovery. One such initiative involves construction of mid-channel sandbars on the Missouri River, where natural sandbar habitat has declined in quantity and quality since the late 1990s. We evaluated nest-site habitat selection by least terns on constructed and natural sandbars by comparing vegetation, substrate, and debris variables at nest sites (n = 798) and random points (n = 1,113) in bare or sparsely vegetated habitats. Our logistic regression models revealed that a broader suite of habitat features was important in nest-site selection on constructed than on natural sandbars. Odds ratios for habitat variables indicated that avoidance of habitat features was the dominant nest-site selection process on both sandbar types, with nesting terns being attracted to nest-site habitat features (gravel and debris) and avoiding vegetation only on constructed sandbars, and avoiding silt and leaf litter on both sandbar types. Despite the seemingly uniform nature of these habitats, our results suggest that a complex suite of habitat features influences nest-site choice by least terns. However, nest-site selection in this social, colonially nesting species may be influenced by other factors, including spatial arrangement of bare sand habitat, proximity to other least terns, and prior habitat occupancy by piping plovers (Charadrius melodus). We found that nest-site selection was sensitive to subtle variation in habitat features, suggesting that rigor in maintaining habitat condition will be necessary in managing sandbars for the benefit of least terns. Further, management strategies that reduce habitat features that are avoided by least terns may be the most beneficial to nesting least terns.

  12. Facile Site-Directed Mutagenesis of Large Constructs Using Gibson Isothermal DNA Assembly.

    Science.gov (United States)

    Yonemoto, Isaac T; Weyman, Philip D

    2017-01-01

    Site-directed mutagenesis is a commonly used molecular biology technique to manipulate biological sequences, and is especially useful for studying sequence determinants of enzyme function or designing proteins with improved activity. We describe a strategy using Gibson Isothermal DNA Assembly to perform site-directed mutagenesis on large (>~20 kbp) constructs that are outside the effective range of standard techniques such as QuikChange II (Agilent Technologies), but more reliable than traditional cloning using restriction enzymes and ligation.

  13. The Discursive Construction of Teachers’ Desirable Identity on a Social Networking Site

    Directory of Open Access Journals (Sweden)

    Radzuwan Ab Rashid

    2016-09-01

    Full Text Available This study is situated in the broader identity-construction literature. Bringing discourse community theory to examine teachers’ postings on Facebook Timelines, we explored how teachers discursively construct socially desirable identities to fit into the Timeline community. Data were gathered from the Status updates and Comments on 29 Timelines belonged to Malaysian English language teachers who were purposively chosen as they often posted and commented on teaching-related issues on their Timelines. The analysis shows that the commonest form of identity construction on the teachers’ Timelines was as an engager which had been carefully constructed to portray positive self-image. This paper concludes that when participating on a public networking site, the teachers were being strategic as not to construct identities which could tarnish their professional image.

  14. Climatic and psychosocial risks of heat illness incidents on construction site.

    Science.gov (United States)

    Jia, Yunyan Andrea; Rowlinson, Steve; Ciccarelli, Marina

    2016-03-01

    The study presented in this paper aims to identify prominent risks leading to heat illness in summer among construction workers that can be prioritised for developing effective interventions. Samples are 216 construction workers' cases at the individual level and 26 construction projects cases at the organisation level. A grounded theory is generated to define the climatic heat and psychosocial risks and the relationships between risks, timing and effectiveness of interventions. The theoretical framework is then used to guide content analysis of 36 individual onsite heat illness cases to identify prominent risks. The results suggest that heat stress risks on construction site are socially constructed and can be effectively managed through elimination at supply chain level, effective engineering control, proactive control of the risks through individual interventions and reactive control through mindful recognition and response to early symptoms. The role of management infrastructure as a base for effective interventions is discussed. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  15. Enhanced On-Site Waste Management of Plasterboard in Construction Works: A Case Study in Spain

    Directory of Open Access Journals (Sweden)

    Ana Jiménez-Rivero

    2017-03-01

    Full Text Available On-site management of construction waste commonly determines its destination. In the case of plasterboard (PB, on-site segregation becomes crucial for closed-loop recycling. However, PB is commonly mixed with other wastes in Spain. In this context, the involvement of stakeholders that can contribute to reversing this current situation is needed. This paper analyzes on-site waste management of PB in Spain through a pilot study of a construction site, with the main objective of identifying best practices to increase waste prevention, waste minimization, and the recyclability of the waste. On-site visits and structured interviews were conducted. The results show five management stages: PB distribution (I; PB installation (II; Construction waste storage at the installation area (III; PB waste segregation at the installation area (IV and PB waste transfer to the PB container and storage (V. The proposed practices refer to each stage and include the merging of Stages III and IV. This measure would avoid the mixing of waste fractions in Stage III, maximizing the recyclability of PB. In addition, two requisites for achieving enhanced management are analyzed: ‘Training and commitment’ and ‘fulfilling the requirements established by the current regulation’. The results show that foremen adopted a more pessimistic attitude than installers towards a joint commitment for waste management. Moreover, not all supervisors valued the importance of a site waste management plan, regulated by the Royal Decree 105/2008 in Spain.

  16. Design and implementation of an identification system in construction site safety for proactive accident prevention.

    Science.gov (United States)

    Yang, Huanjia; Chew, David A S; Wu, Weiwei; Zhou, Zhipeng; Li, Qiming

    2012-09-01

    Identifying accident precursors using real-time identity information has great potential to improve safety performance in construction industry, which is still suffering from day to day records of accident fatality and injury. Based on the requirements analysis for identifying precursor and the discussion of enabling technology solutions for acquiring and sharing real-time automatic identification information on construction site, this paper proposes an identification system design for proactive accident prevention to improve construction site safety. Firstly, a case study is conducted to analyze the automatic identification requirements for identifying accident precursors in construction site. Results show that it mainly consists of three aspects, namely access control, training and inspection information and operation authority. The system is then designed to fulfill these requirements based on ZigBee enabled wireless sensor network (WSN), radio frequency identification (RFID) technology and an integrated ZigBee RFID sensor network structure. At the same time, an information database is also designed and implemented, which includes 15 tables, 54 queries and several reports and forms. In the end, a demonstration system based on the proposed system design is developed as a proof of concept prototype. The contributions of this study include the requirement analysis and technical design of a real-time identity information tracking solution for proactive accident prevention on construction sites. The technical solution proposed in this paper has a significant importance in improving safety performance on construction sites. Moreover, this study can serve as a reference design for future system integrations where more functions, such as environment monitoring and location tracking, can be added. Copyright © 2011 Elsevier Ltd. All rights reserved.

  17. Evaluation of Acquisition Strategies for Image-Based Construction Site Monitoring

    Science.gov (United States)

    Tuttas, S.; Braun, A.; Borrmann, A.; Stilla, U.

    2016-06-01

    Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM). The BIM contains the as-planned states (geometry, schedule, costs, ...) of a construction project. For updating, the as-built state has to be acquired repeatedly and compared to the as-planned state. In the approach presented here, a 3D representation of the as-built state is calculated from photogrammetric images using multi-view stereo reconstruction. On construction sites one has to cope with several difficulties like security aspects, limited accessibility, occlusions or construction activity. Different acquisition strategies and techniques, namely (i) terrestrial acquisition with a hand-held camera, (ii) aerial acquisition using a Unmanned Aerial Vehicle (UAV) and (iii) acquisition using a fixed stereo camera pair at the boom of the crane, are tested on three test sites. They are assessed considering the special needs for the monitoring tasks and limitations on construction sites. The three scenarios are evaluated based on the ability of automation, the required effort for acquisition, the necessary equipment and its maintaining, disturbance of the construction works, and on the accuracy and completeness of the resulting point clouds. Based on the experiences during the test cases the following conclusions can be drawn: Terrestrial acquisition has the lowest requirements on the device setup but lacks on automation and coverage. The crane camera shows the lowest flexibility but the highest grade of automation. The UAV approach can provide the best coverage by combining nadir and oblique views, but can be limited by obstacles and security aspects. The accuracy of the point clouds is evaluated based on plane fitting of selected building parts. The RMS errors of the fitted parts range from 1 to a few cm for the UAV and the hand-held scenario. First results show that the crane camera

  18. EVALUATION OF ACQUISITION STRATEGIES FOR IMAGE-BASED CONSTRUCTION SITE MONITORING

    Directory of Open Access Journals (Sweden)

    S. Tuttas

    2016-06-01

    Full Text Available Construction site monitoring is an essential task for keeping track of the ongoing construction work and providing up-to-date information for a Building Information Model (BIM. The BIM contains the as-planned states (geometry, schedule, costs, ... of a construction project. For updating, the as-built state has to be acquired repeatedly and compared to the as-planned state. In the approach presented here, a 3D representation of the as-built state is calculated from photogrammetric images using multi-view stereo reconstruction. On construction sites one has to cope with several difficulties like security aspects, limited accessibility, occlusions or construction activity. Different acquisition strategies and techniques, namely (i terrestrial acquisition with a hand-held camera, (ii aerial acquisition using a Unmanned Aerial Vehicle (UAV and (iii acquisition using a fixed stereo camera pair at the boom of the crane, are tested on three test sites. They are assessed considering the special needs for the monitoring tasks and limitations on construction sites. The three scenarios are evaluated based on the ability of automation, the required effort for acquisition, the necessary equipment and its maintaining, disturbance of the construction works, and on the accuracy and completeness of the resulting point clouds. Based on the experiences during the test cases the following conclusions can be drawn: Terrestrial acquisition has the lowest requirements on the device setup but lacks on automation and coverage. The crane camera shows the lowest flexibility but the highest grade of automation. The UAV approach can provide the best coverage by combining nadir and oblique views, but can be limited by obstacles and security aspects. The accuracy of the point clouds is evaluated based on plane fitting of selected building parts. The RMS errors of the fitted parts range from 1 to a few cm for the UAV and the hand-held scenario. First results show that the crane

  19. Radio-anatomy Atlas for delineation SIRIADE web site: features and 1 year results

    International Nuclear Information System (INIS)

    Denisa, F.; Pointreau, Y.

    2010-01-01

    3-D conformal radiotherapy is based on accurate target volumes delineation. Radio-anatomy knowledge's are useful but sometimes difficult to obtain. Moreover, the sources of recommendations for volume definition are disparate. We thus developed a free radio-anatomy web site dedicated to volumes delineation for radiation-oncologists (www.siriade.org). This web site is a search engine allowing to access to delineation characteristics of main tumours illustrated with clinical cases. It does not aim to provide guidelines. Its main purpose is to provide an iconographic training support with frequent up-datings. We present the features of this web site and one year connexion statistics. (authors)

  20. Workers’ Age and the Impact of Psychological Factors on the Perception of Safety at Construction Sites

    Directory of Open Access Journals (Sweden)

    Muhammad Dawood Idrees

    2017-05-01

    Full Text Available The safety of construction workers is always a major concern at construction sites as the construction industry is inherently dangerous with many factors influencing worker safety. Several studies concluded that psychological factors such as workload, organizational relationships, mental stress, job security, and job satisfaction have significant effects on workers’ safety. However, research on psychological factors that are characteristic of different age groups have been limited. The aim of this study was to examine the impact of psychological factors on the perception of worker safety for two different age groups. After an extensive literature review, different psychological factors were identified, and a hypothetical research model was developed based on psychological factors that could affect workers’ perception of safety. A survey instrument was developed, and data were collected from seven different construction sites in Pakistan. Structural equation modeling (SEM was employed to test the hypothetical model for both age groups. The results revealed that workload and job satisfaction are significantly dominant factors on workers’ perception of safety in older workers, whereas organizational relationships, mental stress, and job security are dominant factors for younger workers at construction sites.

  1. The motivational safety helmet : Redesign suggestions improving the intrinsic motivation of construction site workers

    NARCIS (Netherlands)

    Beldman, T. (Teunis); Boer, de J. (Johannes); Lemmens, P. (Pim); Stilma, M. (Margot)

    2014-01-01

    In reaction to the lack of intrinsic motivation of construction site workers, to wear their safety helmets at all times, a series of research projects studied causes and possible solutions. Goal is to gain an inspirational discussion to get the design onto the next level. This paper describes a

  2. Usability evaluation of mobile ICT support used at the building construction site

    DEFF Research Database (Denmark)

    Christiansson, Per; Svidt, Kjeld

    2006-01-01

    The paper summarizes findings from field evaluations and controlled laboratory usability evaluations of new mobile Information and Communication Technology, ICT, support used by craftsmen at construction sites as well as a discussion of methodologies for user centred ICT tools design. The finding...

  3. Final audit report of remedial action construction at the UMTRA project site Rifle, Colorado. Rev. 1

    International Nuclear Information System (INIS)

    1997-01-01

    This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC)

  4. The Wood and Bark of Hardwoods Growing on Southern Pine Sites - A Pictorial Atlas

    Science.gov (United States)

    Charles W. McMillin; Floyd G. Manwiller

    1980-01-01

    Provides a pictorial description of the structure and appearance of 23 pine-site hardwoods, an overview of hardwood anatomy, and data on the resource and certain important physical properties of stemwood and bark.

  5. Engineered surface barriers for waste disposal sites: lysimeter facility design and construction

    International Nuclear Information System (INIS)

    Phillips, S.J.; Ruben, M.S.; Kirkham, R.R.

    1988-01-01

    A facility to evaluate performance of engineered surface carriers for confinement of buried wastes has been designed, constructed, and operations initiated. The Field Lysimeter Test Facility is located at the US Department of Energy's Hanford Site in Richland, Washington. The facility consists of 18 one-dimensional drainage and weighing lysimeters used to evaluate 7 replicated barrier treatments. Distinct layers of natural earth materials were used to construct layered soil and rock barriers in each lysimeter. These barrier designs are capable in principal of significantly reducing or precluding infiltration of meteoric water through barriers into underlying contaminated zones. This paper summarizes salient facility design and construction features used in testing of the Hanford Site's engineered surface barriers

  6. Construction of hexahedral elements mesh capturing realistic geometries of Bayou Choctaw SPR site

    Energy Technology Data Exchange (ETDEWEB)

    Park, Byoung Yoon [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Roberts, Barry L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-09-01

    The three-dimensional finite element mesh capturing realistic geometries of Bayou Choctaw site has been constructed using the sonar and seismic survey data obtained from the field. The mesh is consisting of hexahedral elements because the salt constitutive model is coded using hexahedral elements. Various ideas and techniques to construct finite element mesh capturing artificially and naturally formed geometries are provided. The techniques to reduce the number of elements as much as possible to save on computer run time with maintaining the computational accuracy is also introduced. The steps and methodologies could be applied to construct the meshes of Big Hill, Bryan Mound, and West Hackberry strategic petroleum reserve sites. The methodology could be applied to the complicated shape masses for not only various civil and geological structures but also biological applications such as artificial limbs.

  7. Construction quality assurance closure report, Lawrence Livermore National Laboratory Site 300, Pits 1 and 7

    International Nuclear Information System (INIS)

    1993-02-01

    This document presents the Final Construction Quality Assurance (CQA) report for the closure cover system of two mixed, low-level radioactive and hazardous waste landfills (pits) at Site 300. Site 300, operated by the Lawrence Livermore National Laboratory (LLNL), is located in the Altamont Hills, approximately 15 miles southeast of Livermore, California. The purpose of this report is to document the CQA program established to assure that construction is completed in accordance with the design intent and the approved Closure and Post Closure Plans dated May 1989 and revised January 1990 (EPA ID Number: CA 2890090002). Inclusive within the Closure and Post Closure Plan were the CQA Plan and the Technical Specifications for the final cover system. This report contains a complete narrative with photographic documentation of the construction activities and progress, problems encountered and solutions utilized, and third party testing and monitoring results, thus establishing the verification of compliance with the Quality Assurance Plan for the project

  8. Differences among Job Positions Related to Communication Errors at Construction Sites

    Science.gov (United States)

    Takahashi, Akiko; Ishida, Toshiro

    In a previous study, we classified the communicatio n errors at construction sites as faulty intention and message pattern, inadequate channel pattern, and faulty comprehension pattern. This study seeks to evaluate the degree of risk of communication errors and to investigate differences among people in various job positions in perception of communication error risk . Questionnaires based on the previous study were a dministered to construction workers (n=811; 149 adminis trators, 208 foremen and 454 workers). Administrators evaluated all patterns of communication error risk equally. However, foremen and workers evaluated communication error risk differently in each pattern. The common contributing factors to all patterns wer e inadequate arrangements before work and inadequate confirmation. Some factors were common among patterns but other factors were particular to a specific pattern. To help prevent future accidents at construction sites, administrators should understand how people in various job positions perceive communication errors and propose human factors measures to prevent such errors.

  9. Improving construction site safety through leader-based verbal safety communication.

    Science.gov (United States)

    Kines, Pete; Andersen, Lars P S; Spangenberg, Soren; Mikkelsen, Kim L; Dyreborg, Johnny; Zohar, Dov

    2010-10-01

    The construction industry is one of the most injury-prone industries, in which production is usually prioritized over safety in daily on-site communication. Workers have an informal and oral culture of risk, in which safety is rarely openly expressed. This paper tests the effect of increasing leader-based on-site verbal safety communication on the level of safety and safety climate at construction sites. A pre-post intervention-control design with five construction work gangs is carried out. Foremen in two intervention groups are coached and given bi-weekly feedback about their daily verbal safety communications with their workers. Foremen-worker verbal safety exchanges (experience sampling method, n=1,693 interviews), construction site safety level (correct vs. incorrect, n=22,077 single observations), and safety climate (seven dimensions, n=105 questionnaires) are measured over a period of up to 42 weeks. Baseline measurements in the two intervention and three control groups reveal that foremen speak with their workers several times a day. Workers perceive safety as part of their verbal communication with their foremen in only 6-16% of exchanges, and the levels of safety at the sites range from 70-87% (correct observations). Measurements from baseline to follow-up in the two intervention groups reveal that safety communication between foremen and workers increases significantly in one of the groups (factor 7.1 increase), and a significant yet smaller increase is found when the two intervention groups are combined (factor 4.6). Significant increases in the level of safety are seen in both intervention groups (7% and 12% increases, respectively), particularly in regards to 'access ways' and 'railings and coverings' (39% and 84% increases, respectively). Increases in safety climate are seen in only one of the intervention groups with respect to their 'attention to safety.' No significant trend changes are seen in the three control groups on any of the three measures

  10. Final audit report of remedial action construction at the UMTRA Project Falls City, Texas, site

    International Nuclear Information System (INIS)

    1995-05-01

    This final audit report for the Falls City, Texas, Uranium Mill Tailings Remedial Action Project site summarizes the radiological audits and the quality assurance (QA) in-process surveillances, audits, and final close-out inspection performed by the U.S. Department of Energy (DOE) and Technical Assistance Contractor (TAC). It also summarizes U.S. Nuclear Regulatory Commission (NRC) surveillances. One radiological audit and three radiological surveillances were performed at the Falls City site. These surveillances and audit, which resulted in 31 observations, focused primarily on processing site activities and were performed on the following dates: 3-6 August 1992, 29-30 October 1992, 22-26 March 1993, and 1-3 November 1993. All outstanding radiological issues were closed out at the completion of the construction activities. Six QA in-process surveillances, which resulted in 71 observations, were performed at the Falls City site on the following dates: 22-24 July 1992, 23-25 November 1992, 17-19 May 1993, 16-18 August 1993, 13-15 October 1993, and 2-4 February 1994. All outstanding issues were closed out with the February surveillance on 3 March 1994. The DOE/TAC remedial action close-out inspections of the Falls City site, which resulted in 56 observations, were conducted 9-10 June 1994 and 26 July 1994. The inspections were closed out on 26 January 1995. The NRC performed three on-site construction reviews (OSCR), resulting in seven observations of remedial action construction activities that occurred during site visits. The OSCRs were performed 9 December 1992, 12 May 1993, and 25 October 1993. Since all audit and surveillance observations and recommendations have been closed out, this final audit report segment of the site certification process is complete

  11. Status of the Texas low-level radioactive waste disposal site - construction sequencing and staffing patterns

    International Nuclear Information System (INIS)

    Jacobi, L.R. Jr.

    1996-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority, an agency of the State of Texas, has been attempting to develop a site for the disposal of low-level radioactive waste in Texas for more than fourteen years. Since 1991, the agency has been evaluating a site near Sierra Blanca, in far west Texas. Site characterization was completed in 1992, and a license application was filed that year. Construction plans were completed in 1993. In April 1996, the licensing agency, the Texas Natural Resource Conservation Commission, completed its review and proposed to issue a license. The administrative hearings on the proposed license should be completed by July 1997. The Authority is prepared to begin construction and operations as soon as a final license can be issued

  12. ATLAS Point 1 Construction

    CERN Multimedia

    Inigo-Golfin, J

    After 3 years of work in point 1, a number of surface buildings have already been completed and handed over to CERN (the control, the gas and the cooling and ventilation buildings) and, probably more appealing to the public, 60,000 m3 of earth have already been excavated from underground. At present, the technical cavern USA15 and its access shaft are almost finished, leaving only the main cavern and the liaison galleries to be completed in the coming year and a half. The main cavern has been excavated down to the radiation limit and its walls and vault will presently be concreted (see below the picture of the section of the vault with the impressive shell of 1.2 m thickness). The excavation of the bench (27 vertical metres to go yet!) will proceed from August, when some additional civil engineering work in the LHC tunnel will be undertaken. Needless to say many different services are necessary around the detector, both for its installation and future operation for physics. To that end much of the heavy...

  13. Network performance measurements as part of feasibility studies on moving an ATLAS event filter to off-site institutes

    CERN Document Server

    Korcyl, K; Dobinson, Robert W; Ivanovici, M; Losada-Maia, Marcia; Meirosu, C; Sladowski, G

    2004-01-01

    We present a system for measuring network performance as part of the feasibility studies for locating the ATLAS third level trigger, the event filter (EF), in remote locations. Part of the processing power required to run the EF algorithms, the current estimate is 2000 state off the art processors, can be provided in remote, CERN-affiliated institutes, if a suitable network connection between CERN and the remote site could be achieved. The system is composed of two PCs equipped with GPS systems, CERN-designed clock cards and Alteon gigabit programmable network interface cards. In the first set of measurements we plan to quantify connection in terms of end-to-end latency, throughput, jitter and packet loss. Running streaming tests and study throughput, IP QoS, routing testing and traffic shaping follows this. Finally, we plan to install the event filter software in a remote location and feed it with data from test beams at CERN. Each of these tests should be preformed with the test traffic treated in the netwo...

  14. The ATLAS Analysis Model

    CERN Multimedia

    Amir Farbin

    The ATLAS Analysis Model is a continually developing vision of how to reconcile physics analysis requirements with the ATLAS offline software and computing model constraints. In the past year this vision has influenced the evolution of the ATLAS Event Data Model, the Athena software framework, and physics analysis tools. These developments, along with the October Analysis Model Workshop and the planning for CSC analyses have led to a rapid refinement of the ATLAS Analysis Model in the past few months. This article introduces some of the relevant issues and presents the current vision of the future ATLAS Analysis Model. Event Data Model The ATLAS Event Data Model (EDM) consists of several levels of details, each targeted for a specific set of tasks. For example the Event Summary Data (ESD) stores calorimeter cells and tracking system hits thereby permitting many calibration and alignment tasks, but will be only accessible at particular computing sites with potentially large latency. In contrast, the Analysis...

  15. Virtual Prototyping for Construction Site Co2 Emissions and Hazard Detection

    Directory of Open Access Journals (Sweden)

    Johnny Kwok Wai Wong

    2014-08-01

    Full Text Available The need for an efficient means of managing emissions and identifying potential hazard black spots in construction processes effectively and at the lowest cost possible has been highlighted in the construction sector. This study illustrates an integrated 5D model developed for quantifying carbon emissions and simulating the pattern of emissions of construction processes as a whole using virtual prototyping technologies. The predicted construction emissions data for each activity is generated and plotted to visually demonstrate the emission rates alongside the integrated four-dimensional VP framework of the construction project. The model also consists of a pro-active construction management system (PCMS, which assist the project team to detect sources of danger to on-site workers and provide pro-active warnings to them so as to avoid fatal accidents that are often caused by falling from heights and being struck by moving objects. A Hong Kong high-rise housing development project is used to exhibit the application of the carbon emission visualisation and potential accident detection system. This tool aims to encourage construction industry practitioners to become more environmentally conscious and pro-active in carbon mitigation and safety performance.

  16. An Atlas of Peroxiredoxins Created Using an Active Site Profile-Based Approach to Functionally Relevant Clustering of Proteins.

    Directory of Open Access Journals (Sweden)

    Angela F Harper

    2017-02-01

    Full Text Available Peroxiredoxins (Prxs or Prdxs are a large protein superfamily of antioxidant enzymes that rapidly detoxify damaging peroxides and/or affect signal transduction and, thus, have roles in proliferation, differentiation, and apoptosis. Prx superfamily members are widespread across phylogeny and multiple methods have been developed to classify them. Here we present an updated atlas of the Prx superfamily identified using a novel method called MISST (Multi-level Iterative Sequence Searching Technique. MISST is an iterative search process developed to be both agglomerative, to add sequences containing similar functional site features, and divisive, to split groups when functional site features suggest distinct functionally-relevant clusters. Superfamily members need not be identified initially-MISST begins with a minimal representative set of known structures and searches GenBank iteratively. Further, the method's novelty lies in the manner in which isofunctional groups are selected; rather than use a single or shifting threshold to identify clusters, the groups are deemed isofunctional when they pass a self-identification criterion, such that the group identifies itself and nothing else in a search of GenBank. The method was preliminarily validated on the Prxs, as the Prxs presented challenges of both agglomeration and division. For example, previous sequence analysis clustered the Prx functional families Prx1 and Prx6 into one group. Subsequent expert analysis clearly identified Prx6 as a distinct functionally relevant group. The MISST process distinguishes these two closely related, though functionally distinct, families. Through MISST search iterations, over 38,000 Prx sequences were identified, which the method divided into six isofunctional clusters, consistent with previous expert analysis. The results represent the most complete computational functional analysis of proteins comprising the Prx superfamily. The feasibility of this novel method is

  17. THREE-DIMENSIONAL GEOFILTRATIONAL MODEL OF THE ROGUN HYDRO POWER PLANT CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Khokhotva Sergey Nikolaevich

    2017-05-01

    Full Text Available The article deals with technique of creation and results of calculations of the three-dimensional geofiltrational model of the Rogun HPP construction site. When performing works on creation of the Rogun HPP three-dimensional geofiltration model, geological and hydrogeological conditions of the Rogun HPP construction site were analyzed. They showed that the construction site consists mostly of fractured rocks of various weathering degrees. In terms of preservation, four preservation zones were identified in the rock mass. These zones define the features of hydrogeological conditions that have emerged in the area of construction. Calculation results illustrated the absence of seepage areas on the lower slope of dam; this is the indication of normal operation of the dam impervious circuit. The drainage system of the underground hydropower plant has a high efficiency. Operation of the drainage galleries complex leads to a significant reduction of piezometric pressure on roofs of the machine and transformer halls. Above the underground structures a completely drained area is formed. Completed forecast calculations on geofiltration model of the Rogun hydropower plant determine the hydrostatic pressure and piezometric pressure at any point of the modeled area. These data can be used as loads while designing of lining of underground workings.

  18. Quantifying and modeling soil erosion and sediment export from construction sites in southern California

    Science.gov (United States)

    Wernet, A. K.; Beighley, R. E.

    2006-12-01

    Soil erosion is a power process that continuously alters the Earth's landscape. Human activities, such as construction and agricultural practices, and natural events, such as forest fires and landslides, disturb the landscape and intensify erosion processes leading to sudden increases in runoff sediment concentrations and degraded stream water quality. Understanding soil erosion and sediment transport processes is of great importance to researchers and practicing engineers, who routinely use models to predict soil erosion and sediment movement for varied land use and climate change scenarios. However, existing erosion models are limited in their applicability to constructions sites which have highly variable soil conditions (density, moisture, surface roughness, and best management practices) that change often in both space and time. The goal of this research is to improve the understanding, predictive capabilities and integration of treatment methodologies for controlling soil erosion and sediment export from construction sites. This research combines modeling with field monitoring and laboratory experiments to quantify: (a) spatial and temporal distribution of soil conditions on construction sites, (b) soil erosion due to event rainfall, and (c) potential offsite discharge of sediment with and without treatment practices. Field sites in southern California were selected to monitor the effects of common construction activities (ex., cut/fill, grading, foundations, roads) on soil conditions and sediment discharge. Laboratory experiments were performed in the Soil Erosion Research Laboratory (SERL), part of the Civil and Environmental Engineering department at San Diego State University, to quantify the impact of individual factors leading to sediment export. SERL experiments utilize a 3-m by 10-m tilting soil bed with soil depths up to 1 m, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). Preliminary modeling, field and laboratory

  19. Site characterization and construction of a controlled shallow test site in central Mexico for archaeological and engineering applications

    Science.gov (United States)

    Rosado-Fuentes, A.; Arango-Galvan, C.; Arciniega-Ceballos, A.; Hernández-Quintero, J. E.; Mendo-Perez, G.

    2017-12-01

    A controlled shallow test site (CSTS) has been constructed at the UNAM Geomagnetic Observatory in Teoloyucan, central Mexico. The objective of the CSTS is to have a controlled place to test new developments and arrays that can be used for archaeological and engineering exploration, as well as to calibrate instruments, train students and for future research. The CSTS was built far enough not to influence the geomagnetic sensors and not be affected by noise sources. Special attention was given to the distribution and geometry of buried materials as well as the instruments used. Before the CSTS was built, a combination of near-surface, non-invasive geophysical techniques was performed to characterize the area of 20 by 32 meters. The methods include magnetometry, electromagnetic induction, ground penetrating radar (GPR), electrical resistivity tomography (ERT) and seismic refraction tomography (SRT). The GPR, SRT and ERT results show relatively flat interfaces. In general, the vertical gradient of the total magnetic field and the electric conductivity have very small variations, showing only one strong magnetic dipole associated to a shallow anomaly. These results indicate that the area is ideal for the construction of the test site. The CSTS consists on buried structures made with different materials and geometries (cubes, cylinders and tubes) commonly used as construction materials in Mexico since Pre-Hispanic times. These materials include concrete, reinforced concrete, wood, brick, adobe, basalt, tezontle and also empty space for controlling responses. The CSTS is versatile enough to be reshaped considering new geometries or materials and to conduct further investigations.

  20. Regulatory inspection activities on nuclear power plant sites during construction in the United Kingdom

    International Nuclear Information System (INIS)

    Jeffery, J.V.

    1977-01-01

    The work of regulatory inspection of the construction of the plant on the site is performed not only by the inspector who has been allocated to inspection duties for that site but also by the specialist staff who are involved with the safety assessment of the plant. The co-ordination of this work is described in the paper and examples are given of inspection activities associated with the enforcement requirements of licence conditions as well as those related to the inspection of the plant itself. (author)

  1. Sites of Memory and the Construction of Democracy: Spain and Chile

    Directory of Open Access Journals (Sweden)

    Maria Chiara Bianchini

    2014-11-01

    Full Text Available This article compares the histories of two sites of memory located in the capital cities of Spain and Chile. Both sites are considered outstanding symbols of the last military dictatorship and their evolution over the past decade reflects the difficult construction of public discourses on dictatorial violence. Both processes take place at the end of two transitions to democracies that have followed similar patterns and have interacted with each other in many ways. Still, these two societies have handled very differently the dictatorial past and its representations.

  2. The measurement of radon concentration of soil in a civil construction site

    International Nuclear Information System (INIS)

    Liu Hanbin; Fan Guang

    2004-01-01

    Radon is one of radioactive resources which do harm to human body. Therefore, its concentration in the soil should be measured before the civil construction works. Code for Indoor Environmental Pollution Control of Civil Building Engineering (GB50325-2001) is the main norm used for soil radon concentration measurement. By using FD-3017 RaA radon measuring equipment, the soil radon concentration in a civil building engineering site has been measured, the result shows that the concentration is lower than the regional average value, radon protective measures should not be installed in that site. (authors)

  3. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    Science.gov (United States)

    De Salvo, A.; Kataoka, M.; Sanchez Pineda, A.; Smirnov, Y.

    2015-12-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original Workload Management Service (WMS) and the new PanDA modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over Wide Area Network. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation Database is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system is in production for ATLAS since 2013, having as main sites in HA the INFN Roma Tier 2 and the CERN Agile Infrastructure. The Light Job Submission Framework for Installation (LJSFi) v2 engine is directly interfacing with PanDA for the Job Management, the Atlas Grid Information System (AGIS) for the site parameter configurations, and CVMFS for both core components and the installation of the software itself. LJSFi2 is also able to use other plugins, and is essentially Virtual Organization (VO) agnostic, so can be directly used and extended to cope with the requirements of any Grid or Cloud enabled VO. In this work we will present the architecture, performance, status and possible evolutions to the system for the LHC Run2 and beyond.

  4. Analysis facility infrastructure (Tier-3) for ATLAS experiment

    International Nuclear Information System (INIS)

    Gonzalez de la Hoz, S.; March, L.; Ros, E.; Sanchez, J.; Amoros, G.; Fassi, F.; Fernandez, A.; Kaci, M.; Lamas, A.; Salt, J.

    2008-01-01

    In the ATLAS computing model the tiered hierarchy ranged from the Tier-0 (CERN) down to desktops or workstations (Tier-3). The focus on defining the roles of each tiered component has evolved with the initial emphasis on the Tier-0 and Tier-1 definition and roles. The various LHC (Large Hadron Collider) projects, including ATLAS, then evolved the tiered hierarchy to include Tier-2's (Regional centers) as part of their projects. Tier-3 centres, on the other hand, have been defined as whatever an institution could construct to support their Physics goals using institutional and otherwise leveraged resources and therefore have not been considered to be part of the official ATLAS computing resources. However, Tier-3 centres are going to exist and will have implications on how the computing model should support ATLAS physicists. Tier-3 users will want to access LHC data and simulations and will want to enable their resources to support their analysis and simulation work. This document will define how IFIC (Instituto de Fisica Corpuscular de Valencia), after discussing with the ATLAS Tier-3 task force, should interact with the ATLAS computing model, detail the conditions under which Tier-3 centres can expect some level of support and set reasonable expectations for the scope and support of ATLAS Tier-3 sites. (orig.)

  5. Criteria for the siting, construction, management and evaluation of low and intermediate activity radioactive waste stores

    International Nuclear Information System (INIS)

    Granero, J.J.

    1986-01-01

    The experience acquired by Spain for the storage of low and intermediate level radioactive wastes, is presented. General considerations related to the technology, financing, administrative measures and risk determination are done. The criteria of site selection for construction and management of the waste storage facility are described, evaluating the specific criteria for the licensing procedure, and taking in account the safety and the radiation protection during periods of the system operation. (M.C.K.) [pt

  6. Modeling injury rates as a function of industrialized versus on-site construction techniques

    OpenAIRE

    Rubio Romero, Juan Carlos; Suárez Cebador, Manuel; Abad Puente, Jesús

    2014-01-01

    It is often predicted that the industrialization of building activities will lead to a reduction of accident rates in the construction sector, particularly as a result of switching activities from building sites to factories. However, to date no scientific research has provided objective quantitative results to back up this claim. The aim of this paper is to evaluate how industrialization affects the accident rate in different industrialized building systems in Spain. Our results revealed tha...

  7. Knowledge based expert system to minimise environmental pollution in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd; Desa, Mohamad Nor Mohamad [Civil Engineering, Universiti Tenaga Nasional, Kajang, Selangor (Malaysia); Basri, Noor Ezlin Ahmad [Civil Engineering, Universiti Tenaga Nasional, Kajang, Selangor (Malaysia)

    2011-07-01

    Construction activities generate enormous amount of erosion and sediments sediments that is the result of soil disturbance during construction activities, thus, will pollute the adjacent water bodies and make it unfeasible for different uses. This paper aimed to develop and create the main features of an expert system prototype (ESCES) for minimising erosion and sedimentation due to stormwater generated from the construction activities by recommending a feasible BMPs. Multi criteria Analysis (MCA) technique has been integrated so as to select the best control measure among many stormwater control alternatives. A questionnaire has been distributed to the relevant experts so as to rank the stormwater control measures to be used in the MCA technique. Using Visual Basic 6, Graphical User Interfaces (GUIs) were developed. The knowledge and experience were acquired from various textural sources (i.e. guidelines, manuals, literature, and human expert). Results from this study showed that the Best Management Practices (BMPs) reommended have good suited the site characteristics. As a conclusion from this study, the ESCES can be considered as part of the 'Green Technology Tool' since it helps in protecting the environment and preserve good quality of water adjacent to the construction sites in Malaysia.

  8. The construction of the Insertable B-Layer and the $b$-tagging performance at high-\\pt of the ATLAS experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00362129; La Rosa, Alessandro; Ferrere, Didier

    Although the recent discovery of the Higgs boson by the LHC experiments represented a major success of the Standard Model theory, several questions need still to be answered. The search of new physics particles beyond the Standard Model will require the LHC to collect a large amount of data. To achieve this goal the LHC collider went through a long shutdown, increasing both the energy and the luminosity. In particular the increase of luminosity will require the ATLAS Inner Detector to operate in a more track-dense environment, which mainly affects the ATLAS Pixel Detector. In order to cope with the high pile-up expected with the increase of luminosity the Pixel detector was then upgraded during the long shutdown with the insertion of a fourth innermost layer, the Insertable B-Layer (IBL). This thesis focuses on the construction of the IBL. This includes the loading of silicon pixel detector modules on the support staves, the quality assurance of these instrumented staves and the commissioning after the integr...

  9. Risk factors for cardiovascular diseases among male workers of building construction site in Delhi

    Directory of Open Access Journals (Sweden)

    Mamta Parashar

    2017-01-01

    Full Text Available Background: Cardiovascular disease (CVD is mainly attributable to a combination of risk factors (RFs: tobacco use, alcohol use, high blood pressure, diabetes, unhealthy diet, and obesity which are amenable to interventions. Building construction workers are poor and vulnerable. They are also the victims of adverse working environmental conditions and subjected to health hazards of occupational origin. Objective: The aim was to study the RFs and associated sociodemographics for CVD among construction site workers. Materials and Methods: This cross-sectional study was conducted among construction site workers. A total of 172 male workers over the age of 18 years were included in the study. Modified World Health Organization Step-wise approach to chronic disease RF surveillance was used to collect data. The data were analyzed in SPSS version 17 and the Chi-square test was applied to analyze the qualitative data. Results: At least one RF for CVD was present in all the subjects, with majority (93.6% of them having at least two RFs. The presence of the RFs (moderate to high, 3–11 was found to be significantly associated with lower income group, unskilled workers, migration year <1, alcoholics, personal tobacco use, family history of tobacco use, and the low knowledge score regarding tobacco use (0–2. Conclusions: Community-based comprehensive behavioral and life style communication package should be established for workers to reduce the modifiable RFs of CVD.

  10. Construction and Quality Assurance of Large Area Resistive Strip Micromegas for the Upgrade of the ATLAS Muon Spectrometer at LHC/CERN

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00389527; The ATLAS collaboration

    2017-01-01

    Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. To cope with increasing background rates, associated with the steadily increasing luminosity of LHC to 10 times design luminosity, the present detector technology in the current innermost stations of the muon endcap system of the ATLAS experiment (the Small Wheel), will be replaced in 2019 by resistive strip Micromegas and small strip TGC detectors. Both technologies will provide tracking and trigger information. In the ``New Small Wheel'' the Micromegas will be arranged in eight detection layers built of trapezoidally shaped quadruplets of four different sizes covering in total about 1200\\,m$^2$ of detection plane. In order to achieve 15\\,\\% transverse momentum resolution for 1 TeV muons, a challenging mechanical precision is required in the construction of each active plane, with an alignment of the readout strips at the level of 30\\,\\textmu m along the precision coordinate and 80\\,\\textmu m perpendicular...

  11. A suggested color scheme for reducing perception-related accidents on construction work sites.

    Science.gov (United States)

    Yi, June-seong; Kim, Yong-woo; Kim, Ki-aeng; Koo, Bonsang

    2012-09-01

    Changes in workforce demographics have led to the need for more sophisticated approaches to addressing the safety requirements of the construction industry. Despite extensive research in other industry domains, the construction industry has been passive in exploring the impact of a color scheme; perception-related accidents have been effectively diminished by its implementation. The research demonstrated that the use of appropriate color schemes could improve the actions and psychology of workers on site, thereby increasing their perceptions of potentially dangerous situations. As a preliminary study, the objects selected by rigorous analysis on accident reports were workwear, safety net, gondola, scaffolding, and safety passage. The colors modified on site for temporary facilities were adopted from existing theoretical and empirical research that suggests the use of certain colors and their combinations to improve visibility and conspicuity while minimizing work fatigue. The color schemes were also tested and confirmed through two workshops with workers and managers currently involved in actual projects. The impacts of color schemes suggested in this paper are summarized as follows. First, the color schemes improve the conspicuity of facilities with other on site components, enabling workers to quickly discern and orient themselves in their work environment. Secondly, the color schemes have been selected to minimize the visual work fatigue and monotony that can potentially increase accidents. Copyright © 2011 Elsevier Ltd. All rights reserved.

  12. Factors influencing unsafe behaviors and accidents on construction sites: a review.

    Science.gov (United States)

    Khosravi, Yahya; Asilian-Mahabadi, Hassan; Hajizadeh, Ebrahim; Hassanzadeh-Rangi, Narmin; Bastani, Hamid; Behzadan, Amir H

    2014-01-01

    Construction is a hazardous occupation due to the unique nature of activities involved and the repetitiveness of several field behaviors. The aim of this methodological and theoretical review is to explore the empirical factors influencing unsafe behaviors and accidents on construction sites. In this work, results and findings from 56 related previous studies were investigated. These studies were categorized based on their design, type, methods of data collection, analytical methods, variables, and key findings. A qualitative content analysis procedure was used to extract variables, themes, and factors. In addition, all studies were reviewed to determine the quality rating and to evaluate the strength of provided evidence. The content analysis identified 8 main categories: (a) society, (b) organization, (c) project management, (d) supervision, (e) contractor, (f) site condition, (g) work group, and (h) individual characteristics. The review highlighted the importance of more distal factors, e.g., society and organization, and project management, that may contribute to reducing the likelihood of unsafe behaviors and accidents through the promotion of site condition and individual features (as proximal factors). Further research is necessary to provide a better understanding of the links between unsafe behavior theories and empirical findings, challenge theoretical assumptions, develop new applied theories, and make stronger recommendations.

  13. Constructing Optimal Coarse-Grained Sites of Huge Biomolecules by Fluctuation Maximization.

    Science.gov (United States)

    Li, Min; Zhang, John Zenghui; Xia, Fei

    2016-04-12

    Coarse-grained (CG) models are valuable tools for the study of functions of large biomolecules on large length and time scales. The definition of CG representations for huge biomolecules is always a formidable challenge. In this work, we propose a new method called fluctuation maximization coarse-graining (FM-CG) to construct the CG sites of biomolecules. The defined residual in FM-CG converges to a maximal value as the number of CG sites increases, allowing an optimal CG model to be rigorously defined on the basis of the maximum. More importantly, we developed a robust algorithm called stepwise local iterative optimization (SLIO) to accelerate the process of coarse-graining large biomolecules. By means of the efficient SLIO algorithm, the computational cost of coarse-graining large biomolecules is reduced to within the time scale of seconds, which is far lower than that of conventional simulated annealing. The coarse-graining of two huge systems, chaperonin GroEL and lengsin, indicates that our new methods can coarse-grain huge biomolecular systems with up to 10,000 residues within the time scale of minutes. The further parametrization of CG sites derived from FM-CG allows us to construct the corresponding CG models for studies of the functions of huge biomolecular systems.

  14. A new algorithm for construction of coarse-grained sites of large biomolecules.

    Science.gov (United States)

    Li, Min; Zhang, John Z H; Xia, Fei

    2016-04-05

    The development of coarse-grained (CG) models for large biomolecules remains a challenge in multiscale simulations, including a rigorous definition of CG representations for them. In this work, we proposed a new stepwise optimization imposed with the boundary-constraint (SOBC) algorithm to construct the CG sites of large biomolecules, based on the s cheme of essential dynamics CG. By means of SOBC, we can rigorously derive the CG representations of biomolecules with less computational cost. The SOBC is particularly efficient for the CG definition of large systems with thousands of residues. The resulted CG sites can be parameterized as a CG model using the normal mode analysis based fluctuation matching method. Through normal mode analysis, the obtained modes of CG model can accurately reflect the functionally related slow motions of biomolecules. The SOBC algorithm can be used for the construction of CG sites of large biomolecules such as F-actin and for the study of mechanical properties of biomaterials. © 2015 Wiley Periodicals, Inc.

  15. Exploring Language Choice and Identity Construction in "In-Between" Sites: Ethnic Media and Community Languages Schools in Australia

    Science.gov (United States)

    Rubino, Antonia; Cruickshank, Ken

    2016-01-01

    Australian research on immigrant languages has paid little attention to interactional approaches to language alternation as identity construction, and sites other than the family and the mainstream school. We argue for the need of studies that take into account a wider range of sites, in particular "community" sites, and adopt…

  16. Analysis of noise on construction sites of high-rise buildings.

    Science.gov (United States)

    Barkokébas, Béda; Vasconcelos, Bianca M; Lago, Eliane Maria G; Alcoforador, Aline Fabiana P

    2012-01-01

    In the civil construction industry sector, it has been observed that the increasing use of machines has made tasks noisier and consequently caused hearing loss and had other adverse effects on workers. The objective of this study was to identify and assess the physical risks of noise present in activities undertaken in a construction company in order to propose control measures which will contribute to the management of health and safety within the company's organization. The methodology applied was based on verifying the characteristics of exposure to noise on construction sites, from an observation of sources which generated noise and making measurements of sound pressure levels emitted by these sources. The data was then analyzed and compared with the recommended performance levels established in control measures. As a result, it was found that some machines and equipment used in civil construction often generate noise above the acceptable levels and as such, in these cases, various control measures have been proposed. It is believed that the use of management techniques is the most effective way to assess risk and to implement the preventive and corrective actions proposed, and allows for the analysis of sound pressure levels on an ongoing basis.

  17. Environmental assessment for the A-01 outfall constructed wetlands project at the Savannah River Site

    International Nuclear Information System (INIS)

    1998-10-01

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021)

  18. Proceedings of the CNRA Workshop on New Reactor Siting, Licensing and Construction Experience

    International Nuclear Information System (INIS)

    2011-01-01

    This report documents the proceedings from the 'Workshop on New Reactor Siting, Licensing and Construction Experience', held in Prague, Czech Republic on 15-17 September 2010. A total of 59 specialists from 16 countries and international organisations attended. The Meeting was sponsored by the OECD Nuclear Energy Agency Committee on Nuclear Regulatory Activities and hosted by the State Office for Nuclear Safety (SUJB) in Czech Republic. The objectives of the workshop were to review and discuss recent and past construction experience lessons learned including perspectives from regulatory authorities, as well as vendors, and licensee. The workshop addressed issues associated with project management resources including: a) overall human resources, expertise, experience and organisation available to the licensee, b) capability of each potential vendor (in-house knowledge and skills versus planned subcontracting and subcontractor management). The workshop also discussed the lessons learned in the regulation of site selection, evaluation and site preparation as well as the review of regulatory practices for the licensing of new reactors, including the regulatory body infrastructure, staffing and expertise needed. The workshop provided an excellent opportunity to communicate recent experience on these topics to a wider audience, including participants from OECD member countries as well as New Entrants from non-OECD member countries. The workshop allowed the WGRNR group to introduce and discuss the current programme of work and products under development in order to gain insights from workshop participants on each of the programme of work areas, and get feedback on additional focus areas. The workshop was structured in 4 technical sessions, each followed by ample time for panel discussions. The first technical session was devoted to presentations of the licensing process for new reactors followed by different member countries. The second technical session was

  19. The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation

    Science.gov (United States)

    Zhadanovsky, Boris; Sinenko, Sergey

    2018-03-01

    Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.

  20. ATLAS people can run!

    CERN Multimedia

    Claudia Marcelloni de Oliveira; Pauline Gagnon

    It must be all the training we are getting every day, running around trying to get everything ready for the start of the LHC next year. This year, the ATLAS runners were in fine form and came in force. Nine ATLAS teams signed up for the 37th Annual CERN Relay Race with six runners per team. Under a blasting sun on Wednesday 23rd May 2007, each team covered the distances of 1000m, 800m, 800m, 500m, 500m and 300m taking the runners around the whole Meyrin site, hills included. A small reception took place in the ATLAS secretariat a week later to award the ATLAS Cup to the best ATLAS team. For the details on this complex calculation which takes into account the age of each runner, their gender and the color of their shoes, see the July 2006 issue of ATLAS e-news. The ATLAS Running Athena Team, the only all-women team enrolled this year, won the much coveted ATLAS Cup for the second year in a row. In fact, they are so good that Peter Schmid and Patrick Fassnacht are wondering about reducing the women's bonus in...

  1. Construction management at the SP-100 ground engineering system test site

    International Nuclear Information System (INIS)

    Burchell, G.P.; Wilson, L.R.

    1991-01-01

    Contractors under the U.S. Department of Energy management have implemented a comprehensive approach to the management of design and construction of the complex facility modifications at the SP-100 Ground Engineering System Test Site on the Hanford Reservation. The SP-100 Test Site employs a multi-organizational integrated management approach with clearly defined responsibilities to assure success. This approach allows for thorough planning and analysis before the project kick off, thus minimizing the number and magnitude of problems which arise during the course of the project. When combined with a comprehensive cost and schedule/project management reporting system the problems which do occur are recognized early enough to assure timely intervention and resolution

  2. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    Scott, D.E.; Chazel, A.C.; Pechmann, J.H.K.; Estes, R.A.

    1993-06-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980's. The Savannah River Ecology Laboratory (SREL) has completed 14 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ''refuge ponds'' as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022)

  3. Signal Formation Processes in Micromegas Detectors and Quality Control for large size Detector Construction for the ATLAS New Small Wheel

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00387450; Rembser, Christoph

    2017-08-04

    The Micromegas technology is one of the most successful modern gaseous detector concepts and widely utilized in nuclear and particle physics experiments. Twenty years of R & D rendered the technology sufficiently mature to be selected as precision tracking detector for the New Small Wheel (NSW) upgrade of the ATLAS Muon spectrometer. This will be the first large scale application of Micromegas in one of the major LHC experiments. However, many of the fundamental microscopic processes in these gaseous detectors are still not fully understood and studies on several detector aspects, like the micromesh geometry, have never been addressed systematically. The studies on signal formation in Micromegas, presented in the first part of this thesis, focuses on the microscopic signal electron loss mechanisms and the amplification processes in electron gas interaction. Based on a detailed model of detector parameter dependencies, these processes are scrutinized in an iterating comparison between exper- imental result...

  4. On-site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures

    Directory of Open Access Journals (Sweden)

    Serdar Durdyev

    2011-09-01

    Full Text Available Productivity is key to the survival and growth of any organisation, industry or nation. Some factors constrain the achievement of the set project objectives in the New Zealand building and construction industry and are responsible for the reported steady decline of productivity and performance. This study aims to identify the key constraints to on-site labour productivity and improvement measures. Using the descriptive survey method, views of some project managers, contractors and subcontractors in New Zealand were canvassed via pilot interviews and questionnaire surveys at the qualitative and quantity data gathering stages, respectively. Multi-attribute technique was used to analyse the quantitative data. Results showed that the key external constraints to on-site labour productivity comprise, in order of decreasing impact, statutory compliance, unforeseen events and wider external dynamics. The internal constraints, which contribute 67 percent of the onsite productivity issues, comprise reworks, level of skill and experience of the workforce, adequacy of method of construction, buildability issues, and inadequate supervision and coordination. . The factors underlying each broad category of external and internal constraints are reported. The relative levels of impact of the identified constraints are expected to guide the project team in addressing the constraints in a cost-effective manner.

  5. Important considerations related to the construction of observation wells in radiation facilities sites: A review research

    International Nuclear Information System (INIS)

    El-Sayed, S. A.; Salem, W. M.; Atta, E. R.

    2012-01-01

    Observation wells in radiation facility sites are considered the main sources of the required subsurface geologic and hydrogeologic data. They are the most important means to detect the radioactive and/or chemical contaminants within the ground water. Also, they are used to observe the groundwater level fluctuations and perform the different aquifer tests to understand the hydraulic properties of aquifers and the behavior of contaminants transportation. This research reviews the necessary considerations and available techniques for constructing the observation wells properly. The review process depends on the international guidelines presented in the literature and the field experience. The proper well completion is essential for the well efficiency and longevity. Three main important topics are considered and discussed briefly in this review. They are the preliminary considerations, the drilling program and the well protection procedures. The preliminary considerations included are the collection of the available geologic and hydrogeologic data and information, selection of drilling method and the legal requirements. The drilling program comprises the site preparation, drilling processes, sampling, well logging, well design, casing components and materials, gravel pack and well development. The well protection procedures include well grout, concrete slab and others requirements. Observation wells should be constructed to a high standard and should be properly maintained and protected to ensure ongoing and reliable data collection

  6. Final audit report of remedial action construction at the UMTRA Project Site, Gunnison, Colorado. Revision 0

    International Nuclear Information System (INIS)

    1996-01-01

    The final audit report for remedial action at the Gunnison, Colorado Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the U.S. Department of Energy (DOE) and the Technical Assistance Contractor (TAC); and on-site construction reviews (OSCR) performed by the U.S. Nuclear Regulatory Commission (NRC). Two radiological surveillances and four radiological audits were performed at the Gunnison site. The surveillances were performed on 16 to 19 September 1992 and 28 June to 1 July 1993. The radiological audits were performed on 4 to 7 October 1993; 13 to 16 June 1994; 19 to 22 September 1994 and 10 to 12 July 1995. The surveillances and audits resulted in 79 observations. Thirty-four of the observations raised DOE concerns that were resolved on the site or through subsequent corrective action. All outstanding issues were closed on 12 July 1995. The radiological surveillances and audits are discussed in Section 2.0 of this report. Ten QA in-process surveillances were performed at the Gunnison UMTRA Project site. The surveillances were performed on 24 to 25 September 1992, 7 to 9 July 1993, 29 October 1993, 27 to 28 June 1994, 31 October to 1 November 1994, 19 to 20 June 1 995, 20 to 21 July 1995, 17 to 18 August 1995, 20 September 1995, and 11 to 13 October 1995. The surveillances resulted in 100 observations. Six observations contained recommendations that required responses from the Remedial Action Contractor (RAC). Ninety-five observations contained a recommendation that required no response. All outstanding issues were closed on 8 January 1996. The QA in-process surveillances are discussed in Section 3.0 of this report

  7. The ATLAS distributed analysis system

    OpenAIRE

    Legger, F.

    2014-01-01

    In the LHC operations era, analysis of the multi-petabyte ATLAS data sample by globally distributed physicists is a challenging task. To attain the required scale the ATLAS Computing Model was designed around the concept of grid computing, realized in the Worldwide LHC Computing Grid (WLCG), the largest distributed computational resource existing in the sciences. The ATLAS experiment currently stores over 140 PB of data and runs about 140,000 concurrent jobs continuously at WLCG sites. During...

  8. ATLAS recognises its best suppliers

    CERN Multimedia

    2002-01-01

    The ATLAS Collaboration has recently rewarded two of its suppliers in the construction of very major detector components, fabricated in Japan. The ATLAS Supplier Award in recognition of excellent supplier performance has just been attributed to Kawasaki Heavy Industries, while Toshiba Corporation received the award two months ago at their headquarters in Japan.

  9. Construction and Quality Assurance of Large Area Resistive Strip Micromegas for the Upgrade of the ATLAS Muon Spectrometer

    CERN Document Server

    Losel, Philipp Jonathan; The ATLAS collaboration

    2017-01-01

    To cope with the increased background induced hit rate of up to ~15 kHz/cm$^2$ in the innermost stations of the muon endcap system of the ATLAS experiment after the high-luminosity upgrade of the LHC, the currently used precision detectors will be replaced by resistive strip Micromegas in 2019. In the "New Small Wheel" the Micromegas will be arranged in two times four detection layers built of trapezoidally shaped quadruplets of four different sizes.The Micromegas quadruplets will consist of 5 panels, 3 drift panels and 2 readout panels, made of aluminum honeycomb core sandwiched by printed circuit boards (PCBs). To achieve 15% transverse momentum resolution for 1 TeV muons and thus a spatial resolution in a single plane of about 100 $\\mu$m, each active plane has to have an accuracy of 80 $\\mu$m perpendicular to the plane and the alignment of the readout strips on the individual PCBs and particularly the alignment within a quadruplet must fulfill a challenging precision of 30 $\\mu$m. The required mechanical p...

  10. A first look at roadheader construction and estimating techniques for site characterization at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Neil, D.M.; Taylor, D.L.

    1991-01-01

    The Yucca Mountain site characterization program will be based on mechanical excavation techniques for the mined repository construction and development. Tunnel Boring Machines (TBM's), Mobile Miners (MM), Raiseborers (RB), Blind Hole Shaft Boring Machines (BHSB), and Roadheaders (RH) have been selected as the mechanical excavation machines most suited to mine the densely welded and non-welded tuffs of the Topopah Springs and Calico Hills members. Heavy duty RH in the 70 to 100 ton class with 300 Kw cutter motors have been evaluated and formulas developed to predict machine performance based on the rock physical properties and the results of Linear Cutting Machine (LCM) tests done at the Colorado School of Mines (CSM) for Sandia National Labs. (SNL)

  11. Quality assurance of construction work on Dukovany nuclear power plant site

    International Nuclear Information System (INIS)

    Lachs, W.

    1983-01-01

    In order to eliminate the effects of the shrinking of concrete of the 150x70 m 2 bed slab 1 m thick, the slab was divided into 36 segments. The side walls were made of steel wire netting and the segments were concreted using the chessboard method. The second concreting was made only after the volume changes in the first concrete layer terminated. The density of the concrete of the shielding was controlled using routine methods as well as a radiometric densimeter which may be used on the building site, the technological procedure was checked by ultrasound, the surface of the concrete structures designed for epoxy coatings must be even and of uniform grain size. Volume moisture of the bed slab must be less than 4% and temperature lower than 10 degC. All deliveries, assembly and construction work must have a certificate of quality awarded after thorough tests and verification. (E.S.)

  12. A survey of the mechanical properties of concrete for structural purposes prepared on construction sites

    Directory of Open Access Journals (Sweden)

    R. R. J. RIBEIRO

    Full Text Available Abstract This paper aims to study the concrete dosage conditions for structural purposes in construction sitesl, and the impacts of non-compliance of structural concrete for structural safety, having as study case the city of Angicos / RN. Were analyzed the dynamic elasticity modulus, static elasticity modulus and the compressive strength of concrete samples. Was conducted to collect the survey data, a field research aiming to gather information about dosage of concrete used in the works, as well as the collection of cylindrical specimens of 150 mm diameter by 300 mm of height, prepared according to practice of those professionals. The study indicated a clear necessity to reflection on the subject, since there is no concern, or even, a lack of knowledge by the interviewed professionals regarding the care and procedures necessary for the production of concrete with satisfactory quality, once at least 50% of evaluated construction sites presented compressive strength lower than 20 MPa, minimal strength to structural concrete, as recommended by ABNT-NBR 6118:2014.

  13. A comprehensive software suite for protein family construction and functional site prediction.

    Directory of Open Access Journals (Sweden)

    David Renfrew Haft

    Full Text Available In functionally diverse protein families, conservation in short signature regions may outperform full-length sequence comparisons for identifying proteins that belong to a subgroup within which one specific aspect of their function is conserved. The SIMBAL workflow (Sites Inferred by Metabolic Background Assertion Labeling is a data-mining procedure for finding such signature regions. It begins by using clues from genomic context, such as co-occurrence or conserved gene neighborhoods, to build a useful training set from a large number of uncharacterized but mutually homologous proteins. When training set construction is successful, the YES partition is enriched in proteins that share function with the user's query sequence, while the NO partition is depleted. A selected query sequence is then mined for short signature regions whose closest matches overwhelmingly favor proteins from the YES partition. High-scoring signature regions typically contain key residues critical to functional specificity, so proteins with the highest sequence similarity across these regions tend to share the same function. The SIMBAL algorithm was described previously, but significant manual effort, expertise, and a supporting software infrastructure were required to prepare the requisite training sets. Here, we describe a new, distributable software suite that speeds up and simplifies the process for using SIMBAL, most notably by providing tools that automate training set construction. These tools have broad utility for comparative genomics, allowing for flexible collection of proteins or protein domains based on genomic context as well as homology, a capability that can greatly assist in protein family construction. Armed with this new software suite, SIMBAL can serve as a fast and powerful in silico alternative to direct experimentation for characterizing proteins and their functional interactions.

  14. Robust Segmentation of Planar and Linear Features of Terrestrial Laser Scanner Point Clouds Acquired from Construction Sites

    Science.gov (United States)

    Maalek, Reza; Lichti, Derek D; Ruwanpura, Janaka Y

    2018-01-01

    Automated segmentation of planar and linear features of point clouds acquired from construction sites is essential for the automatic extraction of building construction elements such as columns, beams and slabs. However, many planar and linear segmentation methods use scene-dependent similarity thresholds that may not provide generalizable solutions for all environments. In addition, outliers exist in construction site point clouds due to data artefacts caused by moving objects, occlusions and dust. To address these concerns, a novel method for robust classification and segmentation of planar and linear features is proposed. First, coplanar and collinear points are classified through a robust principal components analysis procedure. The classified points are then grouped using a new robust clustering method, the robust complete linkage method. A robust method is also proposed to extract the points of flat-slab floors and/or ceilings independent of the aforementioned stages to improve computational efficiency. The applicability of the proposed method is evaluated in eight datasets acquired from a complex laboratory environment and two construction sites at the University of Calgary. The precision, recall, and accuracy of the segmentation at both construction sites were 96.8%, 97.7% and 95%, respectively. These results demonstrate the suitability of the proposed method for robust segmentation of planar and linear features of contaminated datasets, such as those collected from construction sites. PMID:29518062

  15. Radon atlas of Finland

    International Nuclear Information System (INIS)

    Voutilainen, A.; Maekelaeinen, I.; Pennanen, M.; Reisbacka, H.; Castren, O.

    1997-11-01

    The most efficient means of reducing indoor radon exposure is to locate and mitigate dwellings with radon concentration exceeding the action level of 400 Bq/m 3 and to build new houses so that radon concentrations do not exceed 200 Bq/m 3 . The maps and tables in this report are useful tools for those who plan and decide what kind of radon mitigation measures are needed in municipalities. STUK (The Radiation and Nuclear Safety Authority) has an indoor radon database of 52 000 dwellings, for which the indoor radon concentration and construction details are known. The building site soil type of about 38 000 dwellings is known. This atlas is a summary of all indoor radon measurements made by STUK in lowrise dwellings and in first-floor flats. The results are shown as arithmetic means of 5- or 10-km squares on maps of the provinces. Three radon maps have been made for each province. On one map the data consist of all measurements the position coordinates of which are known. On the two other maps the building sites of houses are classified into permeable and low-permeable soil types. The tables show statistics for all indoor radon measurements by municipality and building site soil type. (orig.)

  16. Design and construction of landslide preventive construction at Yamasubara hydroelectric power plant site. Yamasubata hatsudensho chiten ni okeru jisuberi taisaku koji no sekkei seko ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Takase, H; Ito, M; Sakata, M [The Kyushu Electric Power Co. Inc., Fukuoka (Japan)

    1993-07-30

    This paper reports the design and construction of landslide preventive construction at the site of the Yamasubara hydroelectric power plant (with a maximum output of 40,700 kW) and the result of slope stability verification after completion of the construction. The moderate slope on top of the primary slide has sands presumed to be colluvial deposit distributed with a depth of 10 m or more, where occurrence of a secondary slip was feared as triggered by the primary slide. The power plant protective constructions consisted of concrete walls to protect the entire power plant including buildings, and falling stone protective fences installed around the surge tanks. The temporary measures were so set that groundwater levels are lowered to a level that can assure the slide safety factor of 1.0 or more by means of drain boring using the down-the-hole hammer type. The permanent protective construction used rock anchors that are superior in constructability and economy. The stability of sliding slope faces was verified to confirm effects of the protective constructions. The verification included observations of groundwater level behavior, water well-up from drain holes, and movements in the slopes. The result showed that the protective constructions have give sufficient effects. Continued slope stability control is important. 16 figs., 7 tabs.

  17. Assessment of the living and workplace health and safety conditions of site-resident construction workers in Tehran, Iran.

    Science.gov (United States)

    Mohseni, Peyman Hossein; Farshad, Ali Asghar; Mirkazemi, Roksana; Orak, Rouhangiz Jamshidi

    2015-01-01

    The purpose of this study was to assess living and workplace safety conditions of construction workers in Tehran, Iran. This cross-sectional study was conducted among 410 construction sites in a municipal area of Tehran whose municipal building permits were issued in 2011. Data on ventilation, workplace safety and hygiene were collected by direct observation and interviews with site foremen. Noise levels were estimated from 10 sound-level-meter stations in the municipality area. Lack of ventilation in the workers' rooms was abundant. Bathrooms were unhygienic and minimum requirements such as lighting and ventilation did not exist in 80% of the cases. In nearly 50% of large construction sites, sewage and garbage disposal were inappropriate. Elevator safety was poor at all sites and no measures for fall prevention were present in over 88% of active construction sites. This study showed that the mean 24-h equivalent continuous sound level Leq was over 70 dB in 80% of the sites during weekdays. The results of this study revealed poor health and safety living and working conditions of construction workers in Tehran.

  18. Priority and construction sites of water storage in a watershed in response to climate change

    Science.gov (United States)

    Lin, Cheng-Yu; Zhang, Wen-Yan; Lin, Chao-Yuan

    2014-05-01

    Taiwan is located at the Eastern Asia Monsoon climate zone. Typhoons and/or convectional rains occur frequently and result in high intensity storms in the summer season. Once the detention facilities are shortage or soil infiltration rate become worse in a watershed due to land use, surface runoff is easily to concentrate and threaten the protected areas. Therefore, it is very important to examine the functionality of water storage for a watershed. The purpose of this study is to solve the issue of flooding in the Puzi Creek. A case study of Yizen Bridge Watershed, in which the SCS curve number was used as an index to extract the spatial distribution of the strength of water storage, and the value of watershed mean CN along the main channel was calculated using area-weighting method. Therefore, the hotspot management sites were then derived and the priority method was applied to screen the depression sites for the reference of management authorities in detention ponds placement. The results show that the areas of subzone A with the characteristics of bad condition in topography and soil, which results in poor infiltration. However, the areas are mostly covered with forest and are difficult to create the artificial water storage facilities. Detention dams are strongly recommended at the site of depression in the river channel to decrease discharge velocity and reduce impact from flood disaster. The areas of subzone B are mainly located at the agriculture slope land. The topographic depressions in the farmland are the suitable places to construct the farm ponds for the use of flood detention and sediment deposition in the rainy seasons and irrigation in the dry seasons. Areas of subzone C are mainly occupied the gentle slope land with a better ability in water storage due to low CN value. Farm ponds constructed in the riparian to bypass the nearby river channel can create multifunctional wetland to effectively decrease the peak discharge in the downstream during

  19. An assessment of potential hydrologic and ecologic impacts of constructing mitigation wetlands, Rifle, Colorado, UMTRA project sites

    International Nuclear Information System (INIS)

    1995-04-01

    This-assessment examines the consequences and risks that could result from the proposed construction of mitigation wetlands at the New and Old Rifle Uranium Mill Tailings Remedial Action (UMTRA) Project sites near Rifle, Colorado. Remediation of surface contamination at those sites is now under way. Preexisting wetlands at or near the Old and New Rifle sites have been cleaned up, resulting in the loss of 0.7 and 10.5 wetland acres (ac) (0.28 and 4.2 hectares [ha]) respectively. Another 9.9 ac (4.0 ha) of wetlands are in the area of windblown contamination west of the New Rifle site. The US Army Corps of Engineers (USACE) has jurisdiction over the remediated wetlands. Before remedial action began, and before any wetlands were eliminated, the USACE issued a Section 404 Permit that included a mitigation plan for the wetlands to be lost. The mitigation plan calls for 34.2 ac (1 3.8 ha) of wetlands to be constructed at the south end and to the west of the New Rifle site. The mitigation wetlands would be constructed over and in the contaminated alluvial aquifer at the New Rifle site. As a result of the hydrologic characteristics of this aquifer, contaminated ground water would be expected to enter the environment through the proposed wetlands. A preliminary assessment was therefore required to assess any potential ecological risks associated with constructing the mitigation wetlands at the proposed location

  20. On-site wastewater treatment using subsurface flow constructed wetlands in Ireland.

    Science.gov (United States)

    Gill, Laurence W; O'Luanaigh, Niall; Johnston, Paul M

    2011-01-01

    The results from an Irish EPA-funded project on the effectiveness of using constructed wetlands for treating wastewater from single households is presented, which has contributed to the design guidelines included in the new EPA Code of Practice. Three subsurface flow gravel-filled wetlands were constructed on separate sites--one to provide secondary treatment and the other two to provide tertiary treatment stages for the domestic effluent. A comprehensive analysis over three years was then conducted to provide a robust characterization of the internal dynamics of the systems, particularly with respect to N and P removal as well as evaluating the temporal water balance across the different seasons. The removal of Total N was only 29% and 30% in the secondary and tertiary treatment wetlands, respectively; particularly disappointing for the tertiary treatment process, which was receiving nitrified effluent. Studies on the (15)N stable isotope confirmed that 35% of the ammonium from the septic tank was passing straight through the process without taking part in any biogeochemical processes. However, influent N in the wetlands was shown to be biologically assimilated into organic nitrogen and then released again as soluble ammonium--so-called nitrogen "spiraling." Removal of Total P in the wetlands averaged from 28% to 45% with higher P removals measured during summer periods, although the effluent concentrations were still found to be high (> 5 mg/l on average). The phosphorus in the plant material was also analysed revealing that the annual above-ground stem matter only accounted for 1.3% to 8.4% of the annual total P-load in the wetlands. Finally, the water balance analyses showed that the mean flow discharging from both the secondary and tertiary treatment wetlands was slightly greater than the mean flow to the reed bed over the trial period, with rainfall acting to increase flows by 13% and 5%, respectively, on average in winter while just about balancing

  1. Determining Safety Inspection Thresholds for Employee Incentives Programs on Construction Sites.

    Science.gov (United States)

    Sparer, Emily; Dennerlein, Jack

    2013-01-01

    The goal of this project was to evaluate approaches of determining the numerical value of a safety inspection score that would activate a reward in an employee safety incentive program. Safety inspections are a reflection of the physical working conditions at a construction site and provide a safety score that can be used in incentive programs to reward workers. Yet it is unclear what level of safety should be used when implementing this kind of program. This study explored five ways of grouping safety inspection data collected during 19 months at Harvard University-owned construction projects. Each approach grouped the data by one of the following: owner, general contractor, project, trade, or subcontractor. The median value for each grouping provided the threshold score. These five approaches were then applied to data from a completed project in order to calculate the frequency and distribution of rewards in a monthly safety incentive program. The application of each approach was evaluated qualitatively for consistency, competitiveness, attainability, and fairness. The owner-specific approach resulted in a threshold score of 96.3% and met all of the qualitative evaluation goals. It had the most competitive reward distribution (only 1/3 of the project duration) yet it was also attainable. By treating all workers equally and maintaining the same value throughout the project duration, this approach was fair and consistent. The owner-based approach for threshold determination can be used by owners or general contractors when creating leading indicator incentives programs and by researchers in future studies on incentive program effectiveness.

  2. ATLAS Facility Description Report

    International Nuclear Information System (INIS)

    Kang, Kyoung Ho; Moon, Sang Ki; Park, Hyun Sik; Cho, Seok; Choi, Ki Yong

    2009-04-01

    A thermal-hydraulic integral effect test facility, ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation), has been constructed at KAERI (Korea Atomic Energy Research Institute). The ATLAS has the same two-loop features as the APR1400 and is designed according to the well-known scaling method suggested by Ishii and Kataoka to simulate the various test scenarios as realistically as possible. It is a half-height and 1/288-volume scaled test facility with respect to the APR1400. The fluid system of the ATLAS consists of a primary system, a secondary system, a safety injection system, a break simulating system, a containment simulating system, and auxiliary systems. The primary system includes a reactor vessel, two hot legs, four cold legs, a pressurizer, four reactor coolant pumps, and two steam generators. The secondary system of the ATLAS is simplified to be of a circulating loop-type. Most of the safety injection features of the APR1400 and the OPR1000 are incorporated into the safety injection system of the ATLAS. In the ATLAS test facility, about 1300 instrumentations are installed to precisely investigate the thermal-hydraulic behavior in simulation of the various test scenarios. This report describes the scaling methodology, the geometric data of the individual component, and the specification and the location of the instrumentations in detail

  3. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado: Appendix B to Attachment 3, Lithologic logs and monitor well construction information. Final report

    International Nuclear Information System (INIS)

    1995-09-01

    This volume contains lithology logs and monitor well construction information for: NC processing site; UC processing site; and Burro Canyon disposal site. This information pertains to the ground water hydrology investigations which is attachment 3 of this series of reports

  4. Occupational health and safety issues in the informal economic segment of Pakistan: a survey of construction sites.

    Science.gov (United States)

    Ahmed, Ishfaq; Shaukat, Muhammad Zeeshan; Usman, Ahmad; Nawaz, Muhammad Musarrat; Nazir, Mian Sajid

    2018-06-01

    This research covers the current status of occupational health and safety (OHS)-related practices in the informal construction segment of Pakistan. Data were collected, through interviews, from 316 construction sites employing 3577 workers. The results of the study reveal that both employers and workers lack knowledge of OHS laws/standards and no practices of this nature are enacted at these construction sites. Alarmingly, work-related accidents, whenever they happen, are not given due attention and there is no formal injury-report system. The informal construction industry employs a huge portion of the informal workforce, and lack of OHS happens at tremendous human cost. These research findings may thus play their role in strengthening the case for reforms in the sector. This study, if properly utilized, may also enable employers of the sector by increasing their knowledge about OHS practices and, as a result, trying to offer safer environments for their workers.

  5. Erodibility of waste (Loess) soils from construction sites under water and wind erosional forces.

    Science.gov (United States)

    Tanner, Smadar; Katra, Itzhak; Argaman, Eli; Ben-Hur, Meni

    2018-03-01

    Excess soils from construction sites (waste soils) become a problem when exposed to soil erosion by water or wind. Understanding waste soil erodibility can contribute to its proper reuse for various surface applications. The general objective of the study was to provide a better understanding of the effects of soil properties on erodibility of waste soils excavated from various depths in a semiarid region under rainfall and wind erosive forces. Soil samples excavated from the topsoil (0-0.3m) and subsoil layers (0.3-0.9 and >1m depths) were subjected to simulated rainfall and wind. Under rainfall erosive forces, the subsoils were more erodible than the topsoil, in contrast to the results obtained under wind erosive forces. Exchangeable sodium percentage was the main factor controlling soil erodibility (K i ) under rainfall, and a significant logarithmic regression line was found between these two parameters. In addition, a significant, linear regression was found between K i and slaking values for the studied soil samples, suggesting that the former can be predicted from the latter. Soil erodibility under wind erosion force was controlled mainly by the dry aggregate characteristics (mean weight diameter and aggregate density): their higher values in the subsoil layers resulted in lower soil erodibility compared to the topsoil. Copyright © 2017 Elsevier B.V. All rights reserved.

  6. Industrial hygiene survey report of Millstone Nuclear Power Station No. 3 construction site, Waterford, Connecticut

    International Nuclear Information System (INIS)

    Zaebst, D.D.; Herrick, R.

    1985-11-01

    Personal and area air samples were analyzed for total dust, organic solvent vapors, and metals during spray, brush, and roller painting and paint removal operations at Millstone Nuclear Power Station Number 3 construction site, Waterford, Connecticut, March 1981. Solvent exposures were generally well below their relevant standards. Total dust exposures during paint removal ranged up to 1,000 milligrams per cubic meter (mg/m3) in the containment building. The OSHA standard for total dust is 15mg/m3. Exposures to lead dusts exceeded the OSHA standard of 0.05mg/m3 in the turbine, auxiliary, and containment buildings. Chromium exposures were generally below the OSHA standard of 1mg/m3, except for 2.4mg/m3 in a personal sample taken during paint removal in the containment building. Very few engineering controls other than 3M single use respirators were observed. The authors note that the chromium exposure data is difficult to interpret as the form of the chromium is not known. If the chromium existed as hexavalent chromium exposure was excessive. The authors conclude that in view of the measured exposures to total dust, lead, and chromium, engineering controls and respiratory protection are inadequate. Recommendations include implementing better controls and respiratory protection

  7. Design of NPP of new generation being constructed at Novovoronezh NPP site

    International Nuclear Information System (INIS)

    Afrov, A.; Berkovich, V.; Generalov, V.; Dragunov, Yu.; Krushelnitskij, V.

    2000-01-01

    The design of a new-generation nuclear power plant with advanced WWER-1000 units, currently under construction at Novovoronezh, is dealt with in considerable detail. Information is given on the general layout of the power plant, and the monoblock comprising the four-loop reactor plant with double containment, the turbine hall with two turbine-driven feedwater pumps and safety and auxiliary systems is described. In a separate building at the power plant site, a new fuel storage facility is located designed for extreme external effects. The operations involved in fuel handling, in both the storage facility and the reactor department, are mentioned. The management of various types of radioactive waste is highlighted. The basic principles of the engineering solutions pertaining to the plant's electrical part are outlined. The concept of the instrumentation and control system is explained. Information is also given on the double containment system. A considerable part of the presentation is devoted to the philosophy and concept of the power plant safety, to the results of safety evaluation and to the research carried out in this respect. The paper is concluded with a discussion of the experiments and analyses performed with the aim to justify the design solutions as regards the passive heat removal system. (A.K.)

  8. Sustainability assessment, rating systems and historical buildings Case study: Rehabilitated construction in a university site

    Directory of Open Access Journals (Sweden)

    Sadrykia Somayeh

    2016-01-01

    Full Text Available This paper explores the relationship between the indicators and different factors that “rating systems for green projects” concentrates on, and principles and factors considered in the rehabilitation of historical buildings. In recent years, different methods and systems concerned and improved for assessing environmental sustainability. LEED (Leadership in Energy and Environmental Design and BREEAM (Building Research Establishment (BRE Environmental Assessment Method are two most commonly used rating systems, established in U.S and UK. These systems comprise some categories and different factors to achieve environmentally responsible design. Firstly, this study focuses on the list of rating systems indicators and criteria. Secondly this paper investigates a historical rehabilitated building in the site of Tabriz Art University, as a case study and has tried to compile its green design elements. Finally, this work intends to compare mentioned elements with indicators and factors of building rating systems. Findings of the study revealed that “Materials and Resources”, “indoor environmental quality” and also “Sustainable Sites” ,the most significant indicator of rating systems, had major and important role in the rehabilitation of the building. Beyond this materials’ life cycle was considerable in construction.

  9. Effect of corrosive marine atmosphere on construction materials in Tanzania: Exposure sites and preliminary results

    International Nuclear Information System (INIS)

    Mmari, A.G.; Uiso, C.B.S.; Makundi, I.N.; Potgieter-Vermaak, S.S.; Potgieter, J.H.; Van Grieken, R.

    2007-01-01

    Air pollution studies in Africa are limited and the influence of ambient air quality on buildings and constructions have not been investigated in the larger part of Sub-Saharan Africa. The increasing burden of emission from industry, traffic and coal power plants on ambient air pollution in Sub-Saharan Africa necessitated reviewing previous and current studies. In South Africa a 20-year exposure program, focusing on the effect of ambient exposure on various metals and alloys, showed that the amount of rainfall, relative humidity, atmospheric pollution, wind speed, solar radiation and structural design are some of the factors controlling atmospheric corrosion. Tanzania, being among the Sub-Saharan African countries and partly bordered by Indian ocean, the main source of marine atmosphere, experiences corrosive degradation on metal roofing and cementitious materials. This paper describes the exposure site set-up and will report on some preliminary results of air quality and its relation with the meteorological conditions, as well as surface changes observed, for the year one of exposure. These will thereafter be compared to the completed European and Asian studies, as reported by CLRTAP and RAPIDC respectively. (author)

  10. Spanish ATLAS Tier-1 &Tier-2 perspective on computing over the next years

    CERN Document Server

    Gonzalez de la Hoz, Santiago; The ATLAS collaboration

    2018-01-01

    Since the beginning of the WLCG Project the Spanish ATLAS computer centres have contributed with reliable and stable resources as well as personnel for the ATLAS Collaboration. Our contribution to the ATLAS Tier2s and Tier1s computing resources (disk and CPUs) in the last 10 years has been around 5%, even though the Spanish contribution to the ATLAS detector construction as well as the number of authors are both close to 3%. In 2015 an international advisory committee recommended to revise our contribution according to the participation in the ATLAS experiment. With this scenario, we are optimising the federation of three sites located in Barcelona, Madrid and Valencia, taking into account that the ATLAS collaboration has developed workflows and tools to flexibly use all the resources available to the collaboration, where the Tiered structure is somehow vanishing. In this contribution, we would like to show the evolution and technical updates in the ATLAS Spanish Federated Tier2 and Tier1. Some developments w...

  11. Berlin Brandenburg International (BER: planning and implementation of a concrete supply chain for the airport construction site

    Directory of Open Access Journals (Sweden)

    Guido Riedel

    2012-12-01

    Full Text Available Background: With the decision to extend the airport Berlin-Schönefeld to the new airport Berlin Brandenburg International (BER in 2006, a construction of superlatives has emerged. One of the biggest challenges was the supply of around 2.5 million cubic meters of high quality concrete that had to be produced for the construction of the airport. Due to the scale of this enterprise as well as its environment, the logistic solution of raw material supply has to be found.       Method: The planning of the concrete supply chain for the airport construction site BER had to be carried out with two major goals: the stability of the supply chain to assure that the demands of the construction site are met and delays are prevented, as well as assurance of the high quality standards of the concrete production and to avoid an alkali silica reaction and the resulting unavoidable disaggregation of the concrete. External effects, such as the carbon dioxide emission and the effect of the supply chain on adjoining residents were key factors that had to be integrated in a holistic supply chain concept.  The principle underlying method is an analysis of limiting conditions for two approaches: a centralized supply chain with on-site concrete factory and upstream transport of raw materials versus a decentralized supply chain with off-site factories and downstream transport of ready-mixed concrete. Results: The analysis of constraints and the effects on key requirements of the concrete supply chain for the BER airport construction site lead to the installation of the most modern concrete plant in Europe. The benefits of a centralized supply chain are significant. On one hand, the high quality standards can be met with the on-site mixture of the concrete and centralized quality assurance, on the other hand, the majority of the supply traffic for the construction site was moved from the road to train-bound logistics, meeting the emission requirements of the

  12. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    CERN Document Server

    De Salvo, Alessandro; The ATLAS collaboration; Sanchez, Arturo; Smirnov, Yuri

    2015-01-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original WMS and the new Panda modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over WAN. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation DB is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system i...

  13. Use of Anisotropy, 3D Segmented Atlas, and Computational Analysis to Identify Gray Matter Subcortical Lesions Common to Concussive Injury from Different Sites on the Cortex.

    Directory of Open Access Journals (Sweden)

    Praveen Kulkarni

    Full Text Available Traumatic brain injury (TBI can occur anywhere along the cortical mantel. While the cortical contusions may be random and disparate in their locations, the clinical outcomes are often similar and difficult to explain. Thus a question that arises is, do concussions at different sites on the cortex affect similar subcortical brain regions? To address this question we used a fluid percussion model to concuss the right caudal or rostral cortices in rats. Five days later, diffusion tensor MRI data were acquired for indices of anisotropy (IA for use in a novel method of analysis to detect changes in gray matter microarchitecture. IA values from over 20,000 voxels were registered into a 3D segmented, annotated rat atlas covering 150 brain areas. Comparisons between left and right hemispheres revealed a small population of subcortical sites with altered IA values. Rostral and caudal concussions were of striking similarity in the impacted subcortical locations, particularly the central nucleus of the amygdala, laterodorsal thalamus, and hippocampal complex. Subsequent immunohistochemical analysis of these sites showed significant neuroinflammation. This study presents three significant findings that advance our understanding and evaluation of TBI: 1 the introduction of a new method to identify highly localized disturbances in discrete gray matter, subcortical brain nuclei without postmortem histology, 2 the use of this method to demonstrate that separate injuries to the rostral and caudal cortex produce the same subcortical, disturbances, and 3 the central nucleus of the amygdala, critical in the regulation of emotion, is vulnerable to concussion.

  14. Application of a Coupled Eulerian-Lagrangian Technique on Constructability Problems of Site on Very Soft Soil

    Directory of Open Access Journals (Sweden)

    Junyoung Ko

    2017-10-01

    Full Text Available This paper presents the application of the Coupled Eulerian–Lagrangian (CEL technique on the constructability problems of site on very soft soil. The main objective of this study was to investigate the constructability and application of two ground improvement methods, such as the forced replacement method and the deep mixing method. The comparison between the results of CEL analyses and field investigations was performed to verify the CEL modelling. The behavior of very soft soil and constructability with methods can be appropriately investigated using the CEL technique, which would be useful tools for comprehensive reviews in preliminary design.

  15. Construction and quality assurance of large area resistive strip Micromegas for the upgrade of the ATLAS Muon Spectrometer at LHC/CERN

    Science.gov (United States)

    Lösel, P.

    2017-06-01

    Large area Micromegas detectors will be employed for the first time in high-energy physics experiments. To cope with increasing background rates, associated with the steadily increasing luminosity of LHC to 10 times design luminosity, the present detector technology in the current innermost stations of the muon endcap system of the ATLAS experiment (the Small Wheel), will be replaced in 2019/2020 by resistive strip Micromegas and small strip TGC detectors. Both technologies will provide tracking and trigger information. In the "New Small Wheel" the Micromegas will be arranged in eight detection layers built of trapezoidally shaped quadruplets of four different sizes covering in total about 1200 m2 of detection plane. In order to achieve 15 % transverse momentum resolution for 1 TeV muons, a challenging mechanical precision is required in the construction of each active plane, with an alignment of the readout strips at the level of 30 μm RMS along the precision coordinate and 80 μm RMS perpendicular to the plane. Each individual Micromegas plane must achieve a spatial resolution better than 100 μm at background rates up to 15 kHz/cm2 while being operated in an inhomogeneous magnetic field (B <= 0.3 T). The required mechanical precision for the production of the components and their assembly, on such large area detectors, is a key point and must be controlled during construction and integration. Particularly the alignment of the readout strips within a quadruplet appears to be demanding. The readout strips are etched on PCB boards using photolithographic processes. Depending on the type of the module, 3 or 5 PCB boards need to be joined and precisely aligned to form a full readout plane. The precision in the alignment is reached either by use of precision mechanical holes or by optical masks, both referenced to the strip patterns. Assembly procedures have been developed to build the single panels with the required mechanical precision and to assemble them in a

  16. Prevalence and correlates of nicotine dependence among construction site workers: A cross-sectional study in Delhi

    Directory of Open Access Journals (Sweden)

    Mamta Parashar

    2016-01-01

    Full Text Available Introduction: Workers represent half the world′s population and are major contributors to economic and social development. Tobacco consumption in construction site workers has been considered a big challenge. Objectives: (1 To assess the prevalence of nicotine dependence among tobacco users. (2 To study the correlates of nicotine dependence among the construction site workers. Methodology: A cross sectional study was conducted using a predesigned and pretested structured proforma. The study was conducted among all construction site workers aged 18yrs and above in campus of Hamdard Institute of Medical Sciences and Research and associated HAH centenary hospital, New Delhi.Karl Fagerstrom Nicotine Dependence Questionnaire was used to assess dependence on nicotine. Results: The mean age of construction site workers was 32.04±11.6 years. Among the workers, majority (91% were tobacco user. Among the users, 60% found it difficult to refrain from smoking/chewing in places where use of tobacco is not allowed (e.g. hospitals, government offices, cinemas, Libraries etc. 55% of the users smoked or chewed tobacco during the first hours after waking than during the rest of the day. On multivariate analysis, the factors which were found to be significantly associated with nicotine dependence were lower income group (OR 2.57, CI:1.66-3.99, smokeless tobacco use (OR 2.36,CI:1.30-4.27 and lower education (OR = 2.86 (95% CI 1.97-4.16 for illiterate. Discussion: The prevalence of tobacco use (91% among construction workers is very high compared to that in the general population. Recognition of construction sites as work places and proper implementation of law is needed.

  17. The importance of cleanliness in a proper construction site management in malaysia: a contractor’s perspective

    Science.gov (United States)

    Shazwan, M. A.; Quintin, J. V.; Osman, N. A.; Suhaida, S. K.; Ma'arof, M. I. N.

    2017-11-01

    Construction site’s cleanliness and tidiness is one of top main concerns of construction site management. A good site management with adequate planning in regards to housekeeping will ensure safety to both the site’s working personnel and the neighbouring environment. This is especially of priority today due to the rapid growth of construction projects in Malaysia. Nevertheless, to date, statistics had shown that housekeeping related accidents happened repeatedly despite the awareness on site’s cleanliness and tidiness. The objective of this study was to explore constructor’s perspective on site cleanliness and tidiness. A set of questionnaire was distributed to thirty-four (34) Grade 7 CIDB contractors’ firms in Petaling Jaya. Petaling Jaya was chosen since this area are developed area covered with residential area and cleaning management an importance issues. The goals of the survey study were to identify the following items from the perception of the contractors: (i) the hierarchy of importance of several purposes in ensuring construction site’s cleanliness and tidiness, and (ii) the risk factors that influence a construction site’s level of cleanliness and tidiness. It was found that from the contractor’s perspective, ensuring a site cleanliness and tidiness is of importance mainly due to the need in protecting the environment, whilst, the least in cost saving. In addition, poor personnel’s working attitude was found to be the main risk factor that will influences a construction site’s level of cleanliness and tidiness. Conclusively, construction site’s cleanliness and tidiness is highly vital. Even so, for nationwide awareness on the topic matter will requires full cooperation from all related parties.

  18. A GIS analysis of suitability for construction aggregate recycling sites using regional transportation network and population density features

    Science.gov (United States)

    Robinson, G.R.; Kapo, K.E.

    2004-01-01

    Aggregate is used in road and building construction to provide bulk, strength, support, and wear resistance. Reclaimed asphalt pavement (RAP) and reclaimed Portland cement concrete (RPCC) are abundant and available sources of recycled aggregate. In this paper, current aggregate production operations in Virginia, Maryland, and the District of Columbia are used to develop spatial association models for the recycled aggregate industry with regional transportation network and population density features. The cost of construction aggregate to the end user is strongly influenced by the cost of transporting processed aggregate from the production site to the construction site. More than 60% of operations recycling aggregate in the mid-Atlantic study area are located within 4.8 km (3 miles) of an interstate highway. Transportation corridors provide both sites of likely road construction where aggregate is used and an efficient means to move both materials and on-site processing equipment back and forth from various work sites to the recycling operations. Urban and developing areas provide a high market demand for aggregate and a ready source of construction debris that may be processed into recycled aggregate. Most aggregate recycling operators in the study area are sited in counties with population densities exceeding 77 people/km2 (200 people/mile 2). No aggregate recycling operations are sited in counties with less than 19 people/km2 (50 people/mile2), reflecting the lack of sufficient long-term sources of construction debris to be used as an aggregate source, as well as the lack of a sufficient market demand for aggregate in most rural areas to locate a recycling operation there or justify the required investment in the equipment to process and produce recycled aggregate. Weights of evidence analyses (WofE), measuring correlation on an area-normalized basis, and weighted logistic regression (WLR), are used to model the distribution of RAP and RPCC operations relative

  19. Final audit report of remedial action construction at the UMTRA Project Mexican Hat, Utah -- Monument Valley, Arizona, sites

    International Nuclear Information System (INIS)

    1995-10-01

    The final audit report for remedial action at the Mexican Hat, Utah, Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and QA remedial action close-out inspections performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC); on-site construction reviews (OSCR) performed by the US Nuclear Regulatory Commission (NRC); and a surveillance performed by the Navajo Nation. This report refers to remedial action activities performed at the Mexican Hat, Utah--Monument Valley, Arizona, Uranium Mill Tailings Remedial Action (UMTRA) Project sites

  20. Regulatory principles, criteria and guidelines for site selection, design, construction and operation of uranium tailings retention systems

    International Nuclear Information System (INIS)

    Coady, J.R.; Henry, L.C.

    1978-01-01

    Principles, criteria and guidelines developed by the Atomic Energy Control Board for the management of uranium mill tailings are discussed. The application of these concepts is considered in relation to site selection, design and construction, operation and decommissioning of tailings retention facilities

  1. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO

    Science.gov (United States)

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  2. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO - (Presentation)

    Science.gov (United States)

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  3. Systems Analysis, Scenario Construction and Consequence Analysis Definition for SITE-94

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, N A; Robinson, P [Intera Information Technologies Ltd (United Kingdom); Andersson, Johan; Wingefors, S [Swedish Nuclear Power Inspectorate, Stockholm (Sweden); Skagius, K; Wiborgh, M [Kemakta Konsult AB, Stockholm (Sweden); Wene, C O [Chalmers Inst. of Technology, Goeteborg (Sweden)

    1995-06-01

    SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This report uses scenario definition work as a vehicle to introduce the systems approach to performance assessment which has been developed and tested in SITE-94 and which constitutes one of the main advances made during the project. The results of the application of the methodology are presented separately, in the SITE-94 Summary Report. 40 refs, 21 figs, 12 tabs.

  4. Systems Analysis, Scenario Construction and Consequence Analysis Definition for SITE-94

    International Nuclear Information System (INIS)

    Chapman, N.A.; Robinson, P.; Andersson, Johan; Wingefors, S.; Skagius, K.; Wiborgh, M.; Wene, C.O.

    1995-06-01

    SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This report uses scenario definition work as a vehicle to introduce the systems approach to performance assessment which has been developed and tested in SITE-94 and which constitutes one of the main advances made during the project. The results of the application of the methodology are presented separately, in the SITE-94 Summary Report. 40 refs, 21 figs, 12 tabs

  5. Proposal for the award of a contract for the construction of an on-site hostel at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the construction of an on-site hostel at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the consortium BATIFLEX (GB) - BATINEG (CH), the lowest bidder, for the construction of an on-site hostel at CERN for a total amount of 5 290 000 Swiss francs, not subject to revision. However, for the reasons explained in this document, the Management wishes to request the Finance Committee to give consideration to the approval of a variant to the original specification to allow use to be made of part of an existing building for the reasons detailed in this document, at an additional cost of 350 000 Swiss francs, not subject to revision, bringing the total construction cost to 5 640 000 Swiss francs.

  6. ATLAS Grid Workflow Performance Optimization

    CERN Document Server

    Elmsheuser, Johannes; The ATLAS collaboration

    2018-01-01

    The CERN ATLAS experiment grid workflow system manages routinely 250 to 500 thousand concurrently running production and analysis jobs to process simulation and detector data. In total more than 300 PB of data is distributed over more than 150 sites in the WLCG. At this scale small improvements in the software and computing performance and workflows can lead to significant resource usage gains. ATLAS is reviewing together with CERN IT experts several typical simulation and data processing workloads for potential performance improvements in terms of memory and CPU usage, disk and network I/O. All ATLAS production and analysis grid jobs are instrumented to collect many performance metrics for detailed statistical studies using modern data analytics tools like ElasticSearch and Kibana. This presentation will review and explain the performance gains of several ATLAS simulation and data processing workflows and present analytics studies of the ATLAS grid workflows.

  7. ATLAS recognises its best suppliers

    CERN Multimedia

    Jenni, P

    The ATLAS Collaboration has recently rewarded two of its suppliers in the construction of very major detector components, fabricated in Japan. The ATLAS Supplier Award in recognition of excellent supplier performance was attributed on 2nd September 2002 during a ceremony in Hall 180 to Kawasaki Heavy Industries, while Toshiba Corporation received the award two months before at their headquarters in Japan. The ATLAS experiment will become a reality thanks to a large international collaboration partnership. The industrial suppliers for the components all over the world play a major role in the construction of this gigantic jigsaw for the LHC. And sometimes they perform so well, that their work deserves specially to be recognised. This is the case for Kawasaki Heavy Industries and Toshiba Corporation, producers of the Liquid Argon Barrel Cryostat and of the Superconducting Central Solenoid, respectively. With these awards, the ATLAS Collaboration wants to congratulate Kawasaki and Toshiba for fulfilling the hi...

  8. Real-time safety risk assessment based on a real-time location system for hydropower construction sites.

    Science.gov (United States)

    Jiang, Hanchen; Lin, Peng; Fan, Qixiang; Qiang, Maoshan

    2014-01-01

    The concern for workers' safety in construction industry is reflected in many studies focusing on static safety risk identification and assessment. However, studies on real-time safety risk assessment aimed at reducing uncertainty and supporting quick response are rare. A method for real-time safety risk assessment (RTSRA) to implement a dynamic evaluation of worker safety states on construction site has been proposed in this paper. The method provides construction managers who are in charge of safety with more abundant information to reduce the uncertainty of the site. A quantitative calculation formula, integrating the influence of static and dynamic hazards and that of safety supervisors, is established to link the safety risk of workers with the locations of on-site assets. By employing the hidden Markov model (HMM), the RTSRA provides a mechanism for processing location data provided by the real-time location system (RTLS) and analyzing the probability distributions of different states in terms of false positives and negatives. Simulation analysis demonstrated the logic of the proposed method and how it works. Application case shows that the proposed RTSRA is both feasible and effective in managing construction project safety concerns.

  9. A comparative study of floor construction on sloping sites: an analysis of cumulative energy demand and greenhouse gas emissions

    Directory of Open Access Journals (Sweden)

    Grace Ding

    2016-03-01

    Full Text Available In order to make environmentally aware decisions, there is growing interest in the comparative energy and greenhouse gas (GHG performance of competing construction methods. Little research has been done concerning competing ground floor construction methods, especially given different site variables, such as slope and soil type. A life cycle assessment approach was adopted to analyse environmental impacts, including cumulative energy demand and GHG emissions for detached housing construction in Australia. Data was drawn from 24 case study housing projects, including 12 reinforced concrete and 12 suspended timber floor projects. The data presented in the paper compares cumulative energy demand, GHG and the constituent parts of competing construction methods. The findings indicate that the timber floors use/create significantly less cumulative energy demand and GHG emissions than concrete floors—approximately 2.1 to 2.7 times less energy and 2.3 to 2.9 times less GHG. These findings are limited to the site slope and foundation soil types identified in the paper. The main application of the work is in guidance concerning the lowest environmental impact options for detached housing construction.

  10. ATLAS production system

    CERN Document Server

    Borodin, Mikhail; The ATLAS collaboration; De, Kaushik; Klimentov, Alexei; Golubkov, Dmitry; Maeno, Tadashi; Mashinistov, Ruslan; Wenaus, Torre; Padolski, Siarhei

    2016-01-01

    The second generation of the ATLAS production system called ProdSys2 is a distributed workload manager which used by thousands of physicists to analyze the data remotely, with the volume of processed data is beyond the exabyte scale, across a more than hundred heterogeneous sites. It achieves high utilization by combining dynamic job definition based on many criterias, such as input and output size, memory requirements and CPU consumption with manageable scheduling policies and by supporting different kind of computational resources, such as GRID, clouds, supercomputers and volunteering computers. Besides jobs definition Production System also includes flexible web user interface, which implements user-friendly environment for main ATLAS workflows, e.g. simple way of combining different data flows, and real-time monitoring, optimised for using with huge amount of information to present. We present an overview of the ATLAS Production System major components: job and task definition, workflow manager web user i...

  11. Siting, design and construction of a deep geological repository for the disposal of high level and alpha bearing wastes

    International Nuclear Information System (INIS)

    1990-06-01

    The main objective of this document is to summarize the basic principles and approaches to siting, design and construction of a deep geological repository for disposal of high level and alpha bearing radioactive wastes, as commonly agreed upon by Member States. This report is addressed to decision makers and technical managers as well as to specialists planning for siting, design and construction of geological repositories for disposal of high level and alpha bearing wastes. This document is intended to provide Member States of the IAEA with a summary outline for the responsible implementing organizations to use for siting, designing and constructing confinement systems for high level and alpha bearing radioactive waste in accordance with the protection objectives set by national regulating authorities or derived from safety fundamentals and standards of the IAEA. The protection objectives will be achieved by the isolation of the radionuclides from the environment by a repository system, which consists of a series of man made and natural safety barriers. Engineered barriers are used to enhance natural geological containment in a variety of ways. They must complement the natural barriers to provide adequate safety and necessary redundancy to the barrier system to ensure that safety standards are met. Because of the long timescales involved and the important role of the natural barrier formed by the host rock, the site selection process is a key activity in the repository design and development programme. The choice of the site, the investigation of its geological setting, the exploration of the regional hydrogeological setting and the primary underground excavations are all considered to be part of the siting process. 16 refs

  12. Case Study: LCA Methodology Applied to Materials Management in a Brazilian Residential Construction Site

    Directory of Open Access Journals (Sweden)

    João de Lassio

    2016-01-01

    Full Text Available The construction industry is increasingly concerned with improving the social, economic, and environmental indicators of sustainability. More than ever, the growing demand for construction materials reflects increased consumption of raw materials and energy, particularly during the phases of extraction, processing, and transportation of materials. This work aims to help decision-makers and to promote life cycle thinking in the construction industry. For this purpose, the life cycle assessment (LCA methodology was chosen to analyze the environmental impacts of building materials used in the construction of a residence project in São Gonçalo, Rio de Janeiro, Brazil. The LCA methodology, based on ISO 14040 and ISO 14044 guidelines, is applied with available databases and the SimaPro program. As a result, this work shows that there is a substantial waste of nonrenewable energy, increasing global warming and harm to human health in this type of construction. This study also points out that, for this type of Brazilian construction, ceramic materials account for a high percentage of the mass of a total building and are thus responsible for the majority of environmental impacts.

  13. Siting history and current construction status of disposal facility for low and intermediate level radioactive waste in Korea

    International Nuclear Information System (INIS)

    Sakai, Akihiro; Kikuchi, Saburo; Maruyama, Masakatsu

    2008-01-01

    Korean government decided disposal site for low and intermediate level radioactive waste (LILW), which is located at coastal area near the Wolsong nuclear power plants in Gyeong-Ju city in December. 2005, based on the result of votes of residents in four candidate sites. Since then, Korea Hydro and Nuclear Power Co., Ltd (KHNP), which is the management company of the LILW disposal facility, has carried out the preparation for construction of disposal facility and its licensing process. At the first phase, 100 thousand drums in 200 liter are planned to be disposed of in the rock cavern type disposal facility located at the depth from 80m to 130m below the sea level, and finally 800 thousand drums in 200 liter are planned to be disposed of in the site. This report shows the history of siting for the LILW disposal, the outline of design of disposal facility and current status of its construction, based on the information which was obtained mainly during our visit to the disposal site in Korea. (author)

  14. 75 FR 35901 - On-Site Completion of Construction of Manufactured Homes

    Science.gov (United States)

    2010-06-23

    ... consistent with the current 5-year requirement for DAPIA retention of approved designs and design changes... these documents at the job site; (h) Providing a copy of the final site inspection report and... reasonably be completed in the factory (e.g., fireplaces at marriage lines and designs that involve such...

  15. Supporting ATLAS

    CERN Multimedia

    maximilien brice

    2003-01-01

    Eighteen feet made of stainless steel will support the barrel ATLAS detector in the cavern at Point 1. In total, the ATLAS feet system will carry approximately 6000 tons, and will give the same inclination to the detector as the LHC accelerator.

  16. Advances and Challenges in the Implementation of DiD in Siting, Design, and Construction of Nuclear Installations in Vietnam

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, H.A., E-mail: nhanh@varans.vn [Vietnam Agency for Radiation and Nuclear Safety, Hanoi (Viet Nam)

    2014-10-15

    Vietnam is embarking on a development of a nuclear power program. The main focus is now on the initial 1000 MWe x 2 units of the nuclear power plant in Ninh Thuan province. Now, the nuclear projects of Vietnam are in the phase of siting approval and investment projects approval. The design assessment will be performed in 2013-2014; the construction and installation will be performed from now until the operating licensing is obtained in 2020-2021. With state of development of a nuclear power program in Vietnam, this paper only focuses on advances and challenges in the implementation of Defence in Depth (DID) in siting, design, and construction of nuclear installations in Vietnam. (author)

  17. Supporting ATLAS

    CERN Multimedia

    2003-01-01

    Eighteen feet made of stainless steel will support the barrel ATLAS detector in the cavern at Point 1. In total, the ATLAS feet system will carry approximately 6000 tons, and will give the same inclination to the detector as the LHC accelerator. The installation of the feet is scheduled to finish during January 2004 with an installation precision at the 1 mm level despite their height of 5.3 metres. The manufacture was carried out in Russia (Company Izhorskiye Zavody in St. Petersburg), as part of a Russian and JINR Dubna in-kind contribution to ATLAS. Involved in the installation is a team from IHEP-Protvino (Russia), the ATLAS technical co-ordination team at CERN, and the CERN survey team. In all, about 15 people are involved. After the feet are in place, the barrel toroid magnet and the barrel calorimeters will be installed. This will keep the ATLAS team busy for the entire year 2004.

  18. Multi criteria analysis in environmental management: Selecting the best stormwater erosion and sediment control measure in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd; Desa, Mohamed Nor Mohamed [Civil Engineering, Universiti Tenga Nasional, Kajang, Selangor (Malaysia); Basri, Noor Ezlin Ahmad [Civil and Structural Engineering, Universiti Kebangsaan Malyasia, Bangi, Selangor (Malaysia)

    2011-07-01

    Malaysia located in a tropical region which is interested with a heavy rainfall through the whole seasons of the year. Construction stages usually associated with soil disturbing due to land clearing and grading activities, this combined with the tropical climate in Malaysia, will generate an enormous amount of soil to be eroded and then deposited in the adjacent water bodies. There are many kinds of mitigation measures used so as to reduce the impact of erosion and sedimentation that are generated due to the stormwater in construction sites. This paper presents the application of Multi Criteria Analysis (MCA) tool in choosing the best stormwater control measure by depending on specified criteria and criterion weight. The results obtained from the application of MCA in stormwater pollution control have many benefits to the contractors, consultants and decision makers by making them able to select the best control measure for every stage of construction.

  19. Development of MCESC software for selecting the best stormwater erosion and sediment control measure in Malaysian construction sites

    Energy Technology Data Exchange (ETDEWEB)

    Al-Hadu, Ibrahiem Abdul Razak; Sidek, Lariyah Mohd [Civil Engineering Universiti Tenaga Nasional, Kajan, Selangor (Malaysia); Desa, Mohamed Nor Mohamed; Basri, Noor Ezlin Ahmad [Civil and Structural Engineering, Universiti Kebangsaan Malaysia, Bangi, Selangor (Malaysia)

    2012-07-01

    Malaysia located in a tropical region which is interested with a heavy rainfall through the whole seasons of the year. Construction stages usually associated with soil disturbing due to land clearing and grading activities, this combined with the tropical climate in Malaysia, will generate an enormous amount of soil to be eroded and then deposited into the adjacent water bodies. There are many kinds of mitigation measures used so as to reduce the impact of erosion and sedimentation that are generated due to the stormwater in construction sites. This paper aims to develop and apply Multi Criteria Analysis (MCA) software called Multi Criteria Erosion and Sediment Control (MCESC) software in which it can be applied in selecting the best stormwater control measure by depending on specified criteria and criterion weight. Visual Basic 6 was adopted as a development tool. This software can help the engineers, contractors on site and decision makers to find the best stormwater control measure in any construction site in Malaysia. Users of the MCESC software are given the opportunity to select the best stormwater control measure via expert's judgments that are built in the system or via their own expertise. MCESC software has many benefits since the experts are not always available and the consultancy is a costly issue which add further financial allocations to the project.

  20. Experimental Setup for Evaluation of the Protective Technical Measures Against the Slopes Degradation Along Linear Construction Sites

    Science.gov (United States)

    Kavka, Petr; Zumr, David; Neumann, Martin; Lidmila, Martin; Dufka, Dušan

    2017-04-01

    Soil erosion of the slopes along the linear construction sites, such as railroads, roads, pipelines or watercourses, is usually underestimated by the construction companies and controlling authorities. But under certain circumstances, when the construction site is not maintained and protected properly, a large amounts of soil may be transported from the sites to the surrounding environment during the intensive rainfall. Transported sediment, often carrying adsorbed pollutants, may reach watercourses and cause water recipient siltation and pollution. Within the applied research project we investigate ways of low cost, quick and easy technical measures that would help to protect the slopes against the splash erosion, rills development and sliding. The methodology is based on testing of various permeable covers, sheets, anchoring and patchy vegetation on a plot and hillslope scales. In this contribution we will present the experimental plot setup, consisting of large soil blocks encapsulated in the monitored steel containers and nozzle rainfall simulator. The presentation is funded by the Technological Agency of the Czech Republic (research project TH02030428) and an internal student CTU grant.

  1. Selection of adequate site location during early stages of construction project management: A multi-criteria decision analysis approach

    Science.gov (United States)

    Marović, Ivan; Hanak, Tomaš

    2017-10-01

    In the management of construction projects special attention should be given to the planning as the most important phase of decision-making process. Quality decision-making based on adequate and comprehensive collaboration of all involved stakeholders is crucial in project’s early stages. Fundamental reasons for existence of this problem arise from: specific conditions of construction industry (final products are inseparable from the location i.e. location has a strong influence of building design and its structural characteristics as well as technology which will be used during construction), investors’ desires and attitudes, and influence of socioeconomic and environment aspects. Considering all mentioned reasons one can conclude that selection of adequate construction site location for future investment is complex, low structured and multi-criteria problem. To take into account all the dimensions, the proposed model for selection of adequate site location is devised. The model is based on AHP (for designing the decision-making hierarchy) and PROMETHEE (for pairwise comparison of investment locations) methods. As a result of mixing basis feature of both methods, operational synergies can be achieved in multi-criteria decision analysis. Such gives the decision-maker a sense of assurance, knowing that if the procedure proposed by the presented model has been followed, it will lead to a rational decision, carefully and systematically thought out.

  2. Health Promotion at the Construction Work Site: The Lunch Truck Pilot Study.

    Science.gov (United States)

    Caban-Martinez, Alberto J; Moore, Kevin J; Clarke, Tainya C; Davila, Evelyn P; Clark, John D; Lee, David J; Fleming, Lora E

    2018-04-01

    The transient nature of construction work makes it difficult to conduct longitudinal worksite-based health promotion activities. As part of a workplace health assessment pilot study, we worked with a commercial lunch truck company to disseminate four types of health education materials including cancer screening, workplace injury prevention, fruit and vegetable consumption, and smoking cessation to construction workers purchasing food items from the truck during their job breaks. Two weeks following the worksite assessment, we followed up with these workers to ascertain their use of the health promotion materials. Of the 54 workers surveyed, 83% reported reviewing and sharing the cancer screening materials with their families, whereas 44% discussed the cancer screening materials with coworkers. Similar proportions of workers reviewed, shared, and discussed the other health promotion materials with their family. Lunch trucks may be an effective strategy and delivery method for educating construction workers on healthy behaviors and injury prevention practices.

  3. Development and application of high-precision metrology for the ATLAS tile-calorimeter construction (pre-assembly experience and lessons)

    International Nuclear Information System (INIS)

    Batusov, V.Yu.; Budagov, Yu.A.; Khubua, D.I.

    2004-01-01

    In view of the forthcoming ATLAS assembly in the pit the pre-assembly of the Hadron Tile Calorimeter BARRELS was undertaken at the laboratory hall. A complex of metrology methods (laser, photogrammetry, theodolite, mechanic, PREDICTION programme) developed at the principal stages and resulted in successful high-precision erection of the barrels has been described

  4. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and Other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA)

    Science.gov (United States)

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  5. Construction site workers' malaria knowledge and treatment-seeking pattern in a highly endemic urban area of India.

    Science.gov (United States)

    Shivalli, Siddharudha; Pai, Sudarshan; Akshaya, Kibballi Madhukeshwar; D'Souza, Neevan

    2016-03-16

    Construction sites are potential breeding places for some species of mosquitoes. Construction workers usually stay at the construction sites, thus being extremely susceptible to malaria. For malaria control, a special focus on them is warranted as they often seek treatment from unregulated, private vendors, increasing their risk of exposure to substandard drugs. To elicit the socio-demographic factors associated with comprehensive malaria knowledge (symptoms, mode of spread, and preventive measures) and treatment-seeking pattern (preferred source and type of treatment) among the construction workers in Mangaluru, India; and, to study the association among their comprehensive malaria knowledge, past suffering from malaria (within 1 year) and treatment-seeking pattern. A community based cross-sectional study was conducted in nine randomly selected construction sites of Mangaluru, a high-risk city for malaria with an annual parasite incidence of >2/1000/year, from June-September 2012. A sample size of 132 was estimated assuming at least 30% of them have satisfactory malaria knowledge, 10% absolute precision, 95% confidence level, design effect of 1.5 and 10% non-responses. A semi-structured interview schedule was used, and knowledge scores were computed. Multivariate linear (for knowledge score) and logistic regressions (for preferred source and type of treatment) were applied. One hundred and nineteen workers participated in the study (total approached-138). 85% (n = 101) of them were males. Mean knowledge score was 9.95 ± 3.19 (maximum possible score-16). The majority of them were aware of the symptoms and the mode of malaria transmission. However, workers (β = -0.281, p = 0.001), self stated malaria within 1 year (β = 0.276, p workers (AdjOR 7.21, 95% CI 2.3-22.9) and those with self stated malaria within 1 year (AdjOR 11.21, 95% CI 2.38-52.8) showed favorable treatment-seeking pattern. There is an urgent need of intensifying and streamlining of ongoing malaria

  6. The Impact of Transformational Leadership on Safety Climate and Individual Safety Behavior on Construction Sites

    Directory of Open Access Journals (Sweden)

    Yuzhong Shen

    2017-01-01

    Full Text Available Unsafe acts contribute dominantly to construction accidents, and increasing safety behavior is essential to reduce accidents. Previous research conceptualized safety behavior as an interaction between proximal individual differences (safety knowledge and safety motivation and distal contextual factors (leadership and safety climate. However, relatively little empirical research has examined this conceptualization in the construction sector. Given the cultural background of the sample, this study makes a slight modification to the conceptualization and views transformational leadership as an antecedent of safety climate. Accordingly, this study establishes a multiple mediator model showing the mechanisms through which transformational leadership translates into safety behavior. The multiple mediator model is estimated by the structural equation modeling (SEM technique, using individual questionnaire responses from a random sample of construction personnel based in Hong Kong. As hypothesized, transformational leadership has a significant impact on safety climate which is mediated by safety-specific leader–member exchange (LMX, and safety climate in turn impacts safety behavior through safety knowledge. The results suggest that future safety climate interventions should be more effective if supervisors exhibit transformational leadership, encourage construction personnel to voice safety concerns without fear of retaliation, and repeatedly remind them about safety on the job.

  7. The Impact of Transformational Leadership on Safety Climate and Individual Safety Behavior on Construction Sites.

    Science.gov (United States)

    Shen, Yuzhong; Ju, Chuanjing; Koh, Tas Yong; Rowlinson, Steve; Bridge, Adrian J

    2017-01-05

    Unsafe acts contribute dominantly to construction accidents, and increasing safety behavior is essential to reduce accidents. Previous research conceptualized safety behavior as an interaction between proximal individual differences (safety knowledge and safety motivation) and distal contextual factors (leadership and safety climate). However, relatively little empirical research has examined this conceptualization in the construction sector. Given the cultural background of the sample, this study makes a slight modification to the conceptualization and views transformational leadership as an antecedent of safety climate. Accordingly, this study establishes a multiple mediator model showing the mechanisms through which transformational leadership translates into safety behavior. The multiple mediator model is estimated by the structural equation modeling (SEM) technique, using individual questionnaire responses from a random sample of construction personnel based in Hong Kong. As hypothesized, transformational leadership has a significant impact on safety climate which is mediated by safety-specific leader-member exchange (LMX), and safety climate in turn impacts safety behavior through safety knowledge. The results suggest that future safety climate interventions should be more effective if supervisors exhibit transformational leadership, encourage construction personnel to voice safety concerns without fear of retaliation, and repeatedly remind them about safety on the job.

  8. Nuclear power plant construction and financial assistance - as regards subsidies for promotion of power plant siting

    International Nuclear Information System (INIS)

    Shindo, M.

    1983-01-01

    This paper describes the institutional framework for the granting of subsidies in particular to promote nuclear power plant construction in Japan. It also analyses the technical criteria applied and lists the type of improvements to various facilities and equipment made with such subsidies. (NEA) [fr

  9. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Science.gov (United States)

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  10. The Impact of Transformational Leadership on Safety Climate and Individual Safety Behavior on Construction Sites

    Science.gov (United States)

    Shen, Yuzhong; Ju, Chuanjing; Koh, Tas Yong; Rowlinson, Steve; Bridge, Adrian J.

    2017-01-01

    Unsafe acts contribute dominantly to construction accidents, and increasing safety behavior is essential to reduce accidents. Previous research conceptualized safety behavior as an interaction between proximal individual differences (safety knowledge and safety motivation) and distal contextual factors (leadership and safety climate). However, relatively little empirical research has examined this conceptualization in the construction sector. Given the cultural background of the sample, this study makes a slight modification to the conceptualization and views transformational leadership as an antecedent of safety climate. Accordingly, this study establishes a multiple mediator model showing the mechanisms through which transformational leadership translates into safety behavior. The multiple mediator model is estimated by the structural equation modeling (SEM) technique, using individual questionnaire responses from a random sample of construction personnel based in Hong Kong. As hypothesized, transformational leadership has a significant impact on safety climate which is mediated by safety-specific leader–member exchange (LMX), and safety climate in turn impacts safety behavior through safety knowledge. The results suggest that future safety climate interventions should be more effective if supervisors exhibit transformational leadership, encourage construction personnel to voice safety concerns without fear of retaliation, and repeatedly remind them about safety on the job. PMID:28067775

  11. A system to test the ground surface conditions of construction sites--for safe and efficient work without physical strain.

    Science.gov (United States)

    Koningsveld, Ernst; van der Grinten, Maarten; van der Molen, Henk; Krause, Frank

    2005-07-01

    Ground surface conditions on construction sites have an important influence on the health and safety of workers and their productivity. The development of an expert-based "working conditions evaluation" system is described, intended to assist site managers in recognising unsatisfactory ground conditions and remedying these. The system was evaluated in the period 2002-2003. The evaluation shows that companies recognize poor soil/ground conditions as problematic, but are not aware of the specific physical workload hazards. The developed methods allow assessment of the ground surface quality and selection of appropriate measures for improvement. However, barriers exist at present to wide implementation of the system across the industry. Most significant of these is that responsibility for a site's condition is not clearly located within contracting arrangements, nor is it a topic of serious negotiation.

  12. Construction of permanently inducible miRNA-based expression vectors using site-specific recombinases

    Directory of Open Access Journals (Sweden)

    Garwick-Coppens Sara E

    2011-11-01

    Full Text Available Abstract Background RNA interference (RNAi is a conserved gene silencing mechanism mediated by small inhibitory microRNAs (miRNAs. Promoter-driven miRNA expression vectors have emerged as important tools for delivering natural or artificially designed miRNAs to eukaryotic cells and organisms. Such systems can be used to query the normal or pathogenic functions of natural miRNAs or messenger RNAs, or to therapeutically silence disease genes. Results As with any molecular cloning procedure, building miRNA-based expression constructs requires a time investment and some molecular biology skills. To improve efficiency and accelerate the construction process, we developed a method to rapidly generate miRNA expression vectors using recombinases instead of more traditional cut-and-paste molecular cloning techniques. In addition to streamlining the construction process, our cloning strategy provides vectors with added versatility. In our system, miRNAs can be constitutively expressed from the U6 promoter, or inducibly expressed by Cre recombinase. We also engineered a built-in mechanism to destroy the vector with Flp recombinase, if desired. Finally, to further simplify the construction process, we developed a software package that automates the prediction and design of optimal miRNA sequences using our system. Conclusions We designed and tested a modular system to rapidly clone miRNA expression cassettes. Our strategy reduces the hands-on time required to successfully generate effective constructs, and can be implemented in labs with minimal molecular cloning expertise. This versatile system provides options that permit constitutive or inducible miRNA expression, depending upon the needs of the end user. As such, it has utility for basic or translational applications.

  13. Main - AT Atlas | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ... name: at_atlas_en.zip File URL: ftp://ftp.biosciencedbc.jp/archive/at_atlas/LATE... Database Description Download License Update History of This Database Site Policy | Contact Us Main - AT Atlas | LSDB Archive ...

  14. Protein - TP Atlas | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...p_atlas_protein.zip File URL: ftp://ftp.biosciencedbc.jp/archive/tp_atlas/LATEST/...story of This Database Site Policy | Contact Us Protein - TP Atlas | LSDB Archive ...

  15. Main - TP Atlas | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...me: tp_atlas_en.zip File URL: ftp://ftp.biosciencedbc.jp/archive/tp_atlas/LATEST/...d License Update History of This Database Site Policy | Contact Us Main - TP Atlas | LSDB Archive ...

  16. Prospective Randomized Double-Blind Pilot Study of Site-Specific Consensus Atlas Implementation for Rectal Cancer Target Volume Delineation in the Cooperative Group Setting

    International Nuclear Information System (INIS)

    Fuller, Clifton D.; Nijkamp, Jasper; Duppen, Joop C.; Rasch, Coen R.N.; Thomas, Charles R.; Wang, Samuel J.; Okunieff, Paul; Jones, William E.; Baseman, Daniel; Patel, Shilpen; Demandante, Carlo G.N.; Harris, Anna M.; Smith, Benjamin D.; Katz, Alan W.; McGann, Camille

    2011-01-01

    Purpose: Variations in target volume delineation represent a significant hurdle in clinical trials involving conformal radiotherapy. We sought to determine the effect of a consensus guideline-based visual atlas on contouring the target volumes. Methods and Materials: A representative case was contoured (Scan 1) by 14 physician observers and a reference expert with and without target volume delineation instructions derived from a proposed rectal cancer clinical trial involving conformal radiotherapy. The gross tumor volume (GTV), and two clinical target volumes (CTVA, including the internal iliac, presacral, and perirectal nodes, and CTVB, which included the external iliac nodes) were contoured. The observers were randomly assigned to receipt (Group A) or nonreceipt (Group B) of a consensus guideline and atlas for anorectal cancers and then instructed to recontour the same case/images (Scan 2). Observer variation was analyzed volumetrically using the conformation number (CN, where CN = 1 equals total agreement). Results: Of 14 evaluable contour sets (1 expert and 7 Group A and 6 Group B observers), greater agreement was found for the GTV (mean CN, 0.75) than for the CTVs (mean CN, 0.46-0.65). Atlas exposure for Group A led to significantly increased interobserver agreement for CTVA (mean initial CN, 0.68, after atlas use, 0.76; p = .03) and increased agreement with the expert reference (initial mean CN, 0.58; after atlas use, 0.69; p = .02). For the GTV and CTVB, neither the interobserver nor the expert agreement was altered after atlas exposure. Conclusion: Consensus guideline atlas implementation resulted in a detectable difference in interobserver agreement and a greater approximation of expert volumes for the CTVA but not for the GTV or CTVB in the specified case. Visual atlas inclusion should be considered as a feature in future clinical trials incorporating conformal RT.

  17. Prospective randomized double-blind pilot study of site-specific consensus atlas implementation for rectal cancer target volume delineation in the cooperative group setting

    Science.gov (United States)

    Fuller, Clifton D.; Nijkamp, Jasper; Duppen, Joop; Rasch, Coen R.N.; Thomas, Charles R.; Wang, Samuel J.; Okunieff, Paul; Jones, William E.; Baseman, Daniel; Patel, Shilpen; Demandante, Carlo G. N.; Harris, Anna M.; Smith, Benjamin D.; Katz, Alan W.; McGann, Camille; Harper, Jennifer L.; Chang, Daniel T.; Smalley, Stephen; Marshall, David T.; Goodman, Karyn A.; Papanikolaou, Niko; Kachnic, Lisa A.

    2010-01-01

    Purpose Variation in target volume delineation represents a significant hurdle in clinical trials involving conformal radiotherapy. We sought to determine the impact of a consensus guideline-based visual atlas on contouring of target volumes. Methods A representative case and target volume delineation instructions derived from a proposed rectal cancer clinical trial involving conformal radiotherapy were contoured (Scan1) by 14 physician observers and a reference expert. Gross tumor volume (GTV), and 2 clinical target volumes (CTVA, comprising internal iliac, pre-sacral, and peri-rectal nodes, and CTVB, external iliac nodes) were contoured. Observers were randomly assigned to receipt (Group_A) /non-receipt (Group_B) of a consensus guideline and atlas for anorectal cancers, then instructed to re-contour the same case/images (Scan2). Observer variation was analyzed volumetrically using conformation number (CN, where CN=1 equals a total agreement). Results In 14 evaluable contour sets (1 expert, 7 Group_A, 6 Group_B), there was greater agreement for GTV (mean CN 0.75) than CTVs (mean CN 0.46–0.65). Atlas exposure for Group_A led to a significant increased inter-observer agreement for CTVA (mean initial CN 0.68, post-atlas 0.76; p=0.03), as well as increased agreement with the expert reference (initial mean CN 0.58, 0.69 post-atlas; p=0.02). For GTV and CTVB, neither inter-observer nor expert agreement was altered after atlas exposure. Conclusion Consensus guideline atlas implementation resulted in a detectable difference in inter-observer agreement and greater approximation of expert volumes for CTVA, but not GTV or CTVB, in the specified case. Visual atlas inclusion should be considered as a feature in future clinical trials incorporating conformal radiotherapy. PMID:20400244

  18. The atlas detector

    International Nuclear Information System (INIS)

    Perrodo, P.

    2001-01-01

    The ATLAS detector, one of the two multi-purpose detectors at the Large Hadron Collider at CERN, is currently being built in order to meet the first proton-proton collisions in time. A description of the detector components will be given, corresponding to the most up to date design and status of construction, completed with test beam results and performances of the first serial modules. (author)

  19. Building technology on construction site of nuclear power plant at Zaporozh'e

    Energy Technology Data Exchange (ETDEWEB)

    Dusek, R; Matyas, V [Vodni Stavby, Prague (Czechoslovakia)

    1981-12-01

    Basic data and technical and economic indexes are shown for a WWER 1000 nuclear power plant being built 120 km off Zaporozh'e (USSR). The schedule of construction and the choice of the means of mechanization used for building work are reported. Discussed are building machines used, the location of assembly cranes of the main unit, the design and the building technology of the reactor part, the engine house, deisel generator station, the special operations building, the use of concrete and steel units in the building, and the procurement of materials for the construction. The knowledge gained from the building of the power plant will be applied in the CSSR in the building of 1000 MW unit power plants.

  20. Erosion and sedimentation control on roads and construction sites in the Federated States of Micronesia

    Science.gov (United States)

    Robert R. Ziemer; Walter F. Megahan

    1991-01-01

    Enclosed is the report that Walt Megahan and I prepared following our trip to States of Micronesia. As we discussed earlier, we felt that it was redundant to produce a set of guidelines for road construction since the FAO Conservation Guide 13/5 that was issued in 1989 (ISBN 92-5-102789-X) covers the subject extensively. We felt that we could best tailor this report to...

  1. Drainage filters and constructed wetlands to mitigate site-specific nutrient losses

    DEFF Research Database (Denmark)

    Kjærgaard, Charlotte; Hoffmann, Carl Christian; Iversen, Bo Vangsø

    Despite substantial efforts, the leaching of nutrients from agricultural land is still a serious and costly environmental problem in Denmark and elsewhere. The quality goals of the European Water Framework Directive (WFD) for the aquatic environment require a substantial reduction of diffuse nutr...... drainage. The project studies different approaches of implementing the filter technologies including drainage well or drainage pipe filters as well as surface-flow and sub-surface flow constructed wetlands....

  2. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  3. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    International Nuclear Information System (INIS)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures

  4. Two new wheels for ATLAS

    CERN Multimedia

    2002-01-01

    Juergen Zimmer (Max Planck Institute), Roy Langstaff (TRIUMF/Victoria) and Sergej Kakurin (JINR), in front of one of the completed wheels of the ATLAS Hadronic End Cap Calorimeter. A decade of careful preparation and construction by groups in three continents is nearing completion with the assembly of two of the four 4 m diameter wheels required for the ATLAS Hadronic End Cap Calorimeter. The first two wheels have successfully passed all their mechanical and electrical tests, and have been rotated on schedule into the vertical position required in the experiment. 'This is an important milestone in the completion of the ATLAS End Cap Calorimetry' explains Chris Oram, who heads the Hadronic End Cap Calorimeter group. Like most experiments at particle colliders, ATLAS consists of several layers of detectors in the form of a 'barrel' and two 'end caps'. The Hadronic Calorimeter layer, which measures the energies of particles such as protons and pions, uses two techniques. The barrel part (Tile Calorimeter) cons...

  5. Construction and tests of the Atlas barrel pre sampler and study of the photon/pion rejection in the electromagnetic calorimeter; Realisation du pre-echantillonneur central d'ATLAS et etude de la separation {gamma}/{pi}{sup 0} dans le calorimetre electromagnetique

    Energy Technology Data Exchange (ETDEWEB)

    Saboumazrag, S

    2004-02-01

    ATLAS is one of the detectors which will equip the future proton-proton collider LHC at CERN. The main motivation for the ATLAS experiment is the quest for the Higgs boson. The observation of this particle would be an important step in the understanding of particle physics in the context of the standard model, with or without supersymmetry. This thesis aims to present the construction of the barrel pre-sampler which will equip the front face of the ATLAS electromagnetic calorimeter. The construction and tests of sectors were achieved at the Laboratory of Subatomic Physics and Cosmology of Grenoble. Two of these sectors were mounted on one module of the electromagnetic calorimeter and tested with electron, photon and muon beams at CERN. I participated in these tests and analysed the data. The results were compared to a Monte-Carlo simulation GEANT3. One of the difficulties lies in the necessity to discard photons coming from {pi}{sup 0} {yields} {gamma}{gamma} events because they can be mistaken for photons released in gamma channels of Higgs boson decay. In the mass range spreading from 95 MeV to 150 MeV, H{sup 0} {yields} {gamma}{gamma} is the most adequate process to detect the Higgs boson. A study of the discard parameter {gamma}/{pi}{sup 0} has been performed. For a photon detection efficiency of 90%, the average discard parameter has been assessed to be 2.5 which is slightly lower than the value given by the simulation.

  6. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    International Nuclear Information System (INIS)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE's satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson

  7. Final audit report of remedial action construction at the UMTRA Project Ambrosia Lake, New Mexico, site

    International Nuclear Information System (INIS)

    1995-09-01

    The final audit report for remedial action at the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site consists of a summary of the radiological surveillances/audits, quality assurance (QA) in-process surveillances, and a QA final closeout inspection performed by the US Department of Energy (DOE) and the Technical Assistance Contractor (TAC). One radiological surveillance and three radiological audits were performed at the Ambrosia Lake site. The surveillance was performed on 12--16 April 1993 (DOE, 1993d). The audits were performed on 26--29 July 1993 (DOE, 1993b); 21--23 March 1994 (DOE, 1994d); and 1--2 August 1994 (DOE, 1994d). The surveillance and audits resulted in 47 observations. Twelve of the observations raised DOE concerns that were resolved on site or through subsequent corrective action. All outstanding issues were satisfactorily closed out on 28 December 1994. The radiological surveillance and audits are discussed in this report. A total of seven QA in-process surveillances were performed at the Ambrosia Lake UMTRA site are discussed. The DOE/TAC Ambrosia Lake final remedial action close-out inspection was conducted on 26 July 1995 (DOE, 1995a). To summarize, a total of 155 observations were noted during DOE/TAC audit and surveillance activities. Follow-up to responses required from the RAC for the DOE/TAC surveillance and audit observations indicated that all issues related to the Ambrosia Lake site were resolved and closed to the satisfaction of the DOE

  8. Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site

    International Nuclear Information System (INIS)

    2003-01-01

    This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF 6 ) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF 6 stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the ''Federal Register'' (FR) on September 18, 2001 (''Federal Register'', Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF 6 conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (''United States Code'', Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (''Code of Federal Regulations'', Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF 6 conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a ''Federal Register'' Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (DandD) of the proposed conversion facility at three alternative locations within the Paducah site; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products

  9. Characterization and remediation of soil prior to construction of an on-site disposal facility at Fernald

    International Nuclear Information System (INIS)

    Hunt, A.; Jones, G.; Nelson, K.

    1998-03-01

    During the production years at the Feed Materials Production Center (FMPC), the soil of the site and the surrounding areas was surficially impacted by airborne contamination. The volume of impacted soil is estimated at 2.2 million cubic yards. During site remediation, this contamination will be excavated, characterized, and disposed of. In 1986 the US Environmental Protection Agency (EPA) and the Department of Energy (DOE) entered into a Federal Facility Compliance Agreement (FFCA) covering environmental impacts associated with the FMPC. A site wide Remedial Investigation/Feasibility Study (RI/FS) was initiated pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act, as amended by the Superfund Amendments and Reauthorization Act (CERCLA). The DOE has completed the RI/FS process and has received approval of the final Records of Decision. The name of the facility was changed to the Fernald Environmental Management Project (FEMP) to emphasize the change in mission to environmental restoration. Remedial actions which address similar scopes of work or types of contaminated media have been grouped into remedial projects for the purpose of managing the remediation of the FEMP. The Soil Characterization and Excavation Project (SCEP) will address the remediation of FEMP soils, certain waste units, at- and below-grade material, and will certify attainment of the final remedial limits (FRLs) for the FEMP. The FEMP will be using an on-site facility for low level radioactive waste disposal. The facility will be an above-ground engineered structure constructed of geological material. The area designated for construction of the base of the on-site disposal facility (OSDF) is referred to as the footprint. Contaminated soil within the footprint must be identified and remediated. Excavation of Phase 1, the first of seven remediation areas, is complete

  10. Mongolian Atlas

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Climatic atlas dated 1985, in Mongolian, with introductory material also in Russian and English. One hundred eight pages in single page PDFs.

  11. Requirements and criteria for choosing sites suitable for the construction of nuclear installations and power stations

    International Nuclear Information System (INIS)

    1978-05-01

    The present document explains the selection criteria for areas in Italy suitable for the installation of nuclear power stations to be included in the 'National Site Map' provided for in Section 23 of Act No 393 of 2 August 1975. It represents the results of a thorough investigation into the various aspects of the problem of siting nuclear power stations, at the present stage of technology, taking into account the effect of the installations on the environment and the effect of the environment on the installations. The essential aim is to demonstrate that the requirements derived from these analyses, and on which there was full consultation with the other controlling bodies of European countries (in particular, France, Great Britain and West Germany) ensure the optimum choice of areas from the point of view of safety and public health. (author)

  12. Bats and wind turbines : pre-siting and pre-construction survey protocols

    Energy Technology Data Exchange (ETDEWEB)

    Lausen, C.; Baerwald, E.; Gruver, J.; Barclay, R. [Calgary Univ., AB (Canada)

    2008-05-15

    Studies have shown that a number of bats are killed by moving wind turbine blades at wind farms throughout North America. The studies have shown that over 80 per cent of the fatalities involve migratory bat species. Hoary bats, eastern red bats, and silver-haired bats dominate the fatalities during the fall migration period. Fatality rates vary among wind energy developments. Some data suggest that fatalities are higher on nights with lower wind speeds, and increased fatalities have been associated with taller wind turbines. This report outlined pre-construction survey requirements for preventing bat fatalities at wind power plants. A pre-construction survey was recommended to achieve a representative sampling of bat activity and determine the relative risk to bats. The study suggested that monitoring data from locations across the province should be pooled to provide a better understanding of the landscape-scale patterns of bat migration. Monitoring for bats should be conducted continuously due to the sporadic nature of peaks in bat activity, the influence of temperature, moon phase, and weather variables. Sampling techniques for acoustic detection, radar tracking, and mist-netting should be implemented to determine the abundance of susceptible species and the location of migration routes. All existing meteorological towers should be used as sampling stations with bat detectors installed at ground level and near the top of the tower. Additional detector stations should be distributed throughout the wind resource area. Specialized anabat microphones should be calibrated to record bat activity. Acoustic data should be presented as total bat passes and mean passes per night and matched with corresponding meteorological data. It was concluded that pre-construction monitoring data should be gathered and made available for collaborative and cumulative research efforts. 28 refs., 1 fig.

  13. Experience in applying quality assurance to civil construction work on the Heysham site

    International Nuclear Information System (INIS)

    Wise, D.L.

    1985-01-01

    A comparison of the civil construction works experience on Heysham I nuclear power plant with that of Heysham II following the introduction of a quality system provided on insight into the benefits resulting from quality assurance. These included: improved administration, better identification of responsibility and improved communications, improved pre-planning, better records, and greater control over activities with Suppliers and Sub-contractors. For Heysham II the full benefits of quality assurance were realised by integrating it into the management system and through the practical understanding achieved with the Client. (U.K.)

  14. Development of the radiological protection focus in the site, design and construction of the nuclear power plant in Cuba

    International Nuclear Information System (INIS)

    Rodriguez R, J.M.

    1996-01-01

    The first nuclear station in Cuba NPP Juragua, at present in analysis for starting again the construction, under a multinational economic association, had had as main architect/engineer organization the Design Institute for Nuclear Power Stations of St. Petersburg (former LIAEP). Active participation of Cuban radiation protection specialist of Energoproyecto in the Juragua Project began at the beginning of the site selection works and continued in the design and construction stages up till now, and simultaneously our specialists have been acting as a counterpart of soviet designers, responsible for the general design of the station. Furthermore, some additional works in compliance with the latest safety requirements and the best international practices, which are described, as well as ongoing and planned work were performed. (author). 11 refs., 3 figs

  15. Environmental assessment for the construction, operation, and decommissioning of the Waste Segregation Facility at the Savannah River Site

    International Nuclear Information System (INIS)

    1998-01-01

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the construction, operation and decontamination and decommissioning (D ampersand D) of the Waste Segregation Facility (WSF) for the sorting, shredding, and compaction of low-level radioactive waste (LLW) at the Savannah River Site (SRS) located near Aiken, South Carolina. The LLW to be processed consists of two waste streams: legacy waste which is currently stored in E-Area Vaults of SRS and new waste generated from continuing operations. The proposed action is to construct, operate, and D ampersand D a facility to process low-activity job-control and equipment waste for volume reduction. The LLW would be processed to make more efficient use of low-level waste disposal capacity (E-Area Vaults) or to meet the waste acceptance criteria for treatment at the Consolidated Incineration Facility (CIF) at SRS

  16. Construction of an in vivo human spinal cord atlas based on high-resolution MR images at cervical and thoracic levels: preliminary results.

    Science.gov (United States)

    Taso, Manuel; Le Troter, Arnaud; Sdika, Michaël; Ranjeva, Jean-Philippe; Guye, Maxime; Bernard, Monique; Callot, Virginie

    2014-06-01

    Our goal was to build a probabilistic atlas and anatomical template of the human cervical and thoracic spinal cord (SC) that could be used for segmentation algorithm improvement, parametric group studies, and enrichment of biomechanical modelling. High-resolution axial T2*-weighted images were acquired at 3T on 15 healthy volunteers using a multi-echo-gradient-echo sequence (1 slice per vertebral level from C1 to L2). After manual segmentation, linear and affine co-registrations were performed providing either inter-individual morphometric variability maps, or substructure probabilistic maps [CSF, white and grey matter (WM/GM)] and anatomical SC template. The larger inter-individual morphometric variations were observed at the thoraco-lumbar levels and in the posterior GM. Mean SC diameters were in agreement with the literature and higher than post-mortem measurements. A representative SC MR template was generated and values up to 90 and 100% were observed on GM and WM-probability maps. This work provides a probabilistic SC atlas and a template that could offer great potentialities for parametrical MRI analysis (DTI/MTR/fMRI) and group studies, similar to what has already been performed using a brain atlas. It also offers great perspective for biomechanical models usually based on post-mortem or generic data. Further work will consider integration into an automated SC segmentation pipeline.

  17. A novel approach of fMRI-guided tractography analysis within a group: construction of an fMRI-guided tractographic atlas.

    Science.gov (United States)

    Preti, Maria Giulia; Makris, Nikos; Laganà, Maria Marcella; Papadimitriou, George; Baglio, Francesca; Griffanti, Ludovica; Nemni, Raffaello; Cecconi, Pietro; Westin, Carl-Fredrik; Baselli, Giuseppe

    2012-01-01

    Diffusion Tensor Imaging (DTI) tractography and functional Magnetic Resonance Imaging (fMRI) investigate two complementary aspects of brain networks: white matter (WM) anatomical connectivity and gray matter (GM) function. However, integration standards have yet to be defined; namely, individual fMRI-driven tractography is usually applied and only few studies address group analysis. This work proposes an efficient method of fMRI-driven tractography at group level through the creation of a tractographic atlas starting from the GM areas activated by a verbal fluency task in 11 healthy subjects. The individual tracts were registered to the MNI space. Selection ROIs derived by GM masking and dilation of group activated areas were applied to obtain the fMRI-driven subsets within tracts. An atlas of the tracts recruited among the population was obtained by selecting for each subject the fMRI-guided tracts passing through the high probability voxels (the voxels recruited by the 90% of the subjects) and merging them together. The reliability of this approach was assessed by comparing it with the probabilistic atlas previously introduced in literature. The introduced method allowed to successfully reconstruct activated tracts, which comprehended corpus callosum, left cingulum and arcuate, a small portion of the right arcuate, both cortico-spinal tracts and inferior fronto-occipital fasciculi. Moreover, it proved to give results concordant with the previously introduced probabilistic approach, allowing in addition to reconstruct 3D trajectories of the activated fibers, which appear particularly helpful in the detection of WM connections.

  18. Site selection of the construction of the system for the production of pasta in AP Vojvodina

    Directory of Open Access Journals (Sweden)

    Paunović Goran

    2017-01-01

    Full Text Available In the growing race for the market share, companies geographically position their production and office buildings according to the new business rules. In order for the company to survive in the market, it is necessary to maximize the profit, minimize the costs, maintain a good quality of the product and constantly improve it. The choice of location is one of the vital decisions in the process of building of a production system, although the selection of the location is a problem related to certain time sections in the life of a given production system, the need for research on the effect locations have is stable in time. The aim of the research is the methodological approach to the selection criteria of broader and narrower location for the construction of the production system for pastry production in Vojvodina as an area which has a rich base in raw material. The Agricultural and food industry as branches of industry have a long time tradition as well as a great potential in strengthening economic performances of the Economy of Vojvodina. Evaluation criteria and their use in the model of dimensional analysis will allow a good selection of a good location for the construction of the business systems for the production of pastry.

  19. ATLAS Software Installation on Supercomputers

    CERN Document Server

    Undrus, Alexander; The ATLAS collaboration

    2018-01-01

    PowerPC and high performance computers (HPC) are important resources for computing in the ATLAS experiment. The future LHC data processing will require more resources than Grid computing, currently using approximately 100,000 cores at well over 100 sites, can provide. Supercomputers are extremely powerful as they use resources of hundreds of thousands CPUs joined together. However their architectures have different instruction sets. ATLAS binary software distributions for x86 chipsets do not fit these architectures, as emulation of these chipsets results in huge performance loss. This presentation describes the methodology of ATLAS software installation from source code on supercomputers. The installation procedure includes downloading the ATLAS code base as well as the source of about 50 external packages, such as ROOT and Geant4, followed by compilation, and rigorous unit and integration testing. The presentation reports the application of this procedure at Titan HPC and Summit PowerPC at Oak Ridge Computin...

  20. Summary of ATLAS Pythia 8 tunes

    CERN Document Server

    The ATLAS collaboration

    2012-01-01

    We summarize the latest ATLAS Pythia 8 minimum bias and underlying event tunes. The Pythia 8 MPI tunes in this note have been constructed for nine different PDFs, making use of a new x-dependent hadronic matter distribution model.

  1. Proposed training program for construction personnel involved in remedial action work at sites contaminated by naturally occurring radionuclides

    International Nuclear Information System (INIS)

    Berven, B.A.; Goldsmith, W.A.; Haywood, F.F.; Schiager, K.J.

    1979-01-01

    Many sites used during the early days of the US atomic energy program are contaminated with radionuclides of the primordial decay chains (uranium, thorium, and actinium series). This contamination consists of residues resulting from refining and processing uranium and thorium. Preparation of these sites for release to unrestricted private use will involve the assistance of construction workers, many of whom have limited knowledge of the hazards associated with radioactive materials. Therefore, there is a need to educate these workers in the fundamentals of radioactive material handling to minimize exposures and possible spread of contamination. This training should disseminate relevant information at an appropriate educational level and should instill a cautious, common-sense attitude toward the handling of radioactive materials. The training should emphasize basic information concerning environmental radiation within a context of relative risk. A multi-media format, including colorful visual aids, demonstration, and discussion, should be used to maximize motivation and retention. A detailed, proposed training program design is presented

  2. Design and Construction of Deinococcus Radiodurans for Biodegradation of Organic Toxins at Radioactive DOE Waste Sites

    International Nuclear Information System (INIS)

    Daly, Michael J.; Wackett, Lawrence P.; Fredrickson, James K.

    2001-01-01

    Seventy million cubic meters of ground and three trillion liters of groundwater have been contaminated by leaking radioactive waste generated in the United States during the Cold War. A cleanup technology is being developed based on the extremely radiation resistant bacterium Deinococcus radiodurans that is being engineered to express bioremediating functions. Research aimed at developing D. radiodurans for organic toxin degradation in highly radioactive waste sites containing radionuclides, heavy metals, and toxic organic compounds was started by this group.Work funded by the existing grant has already contributed to eleven papers on the fundamental biology of D. radiodurans and its design for bioremediation of highly radioactive waste environments

  3. Construction of an Unmarked Zymomonas mobilis Mutant Using a Site-Specific FLP Recombinase

    Directory of Open Access Journals (Sweden)

    Shao-Lan Zou

    2012-01-01

    Full Text Available Flippase expression was carried out in Zymomonas mobilis strain ZM4. The FRT-flanked selection marker gene was first integrated into the ZM4 chromosome by homologous recombination. The Saccharomyces cerevisiae flp gene was then introduced under the control of the ZM4 gap gene promoter (Pgap, encoding glyceraldehyde-3-phosphate dehydrogenase or the λ bacteriophage cI857-pR contained in the broad-host-range cloning vector pBBR1-MCS-2. This study demonstrated that flp was expressed and that the deletion frequency of the FRT-flanked marker gene was very high (approx. 100 %. In addition, the flp gene expression vector could be conveniently removed from the resulting unmarked Z. mobilis mutants by serially transferring the cells three times into antibiotic-free medium, thereby establishing an efficient method for constructing unmarked Z. mobilis mutants.

  4. Ecological studies related to construction of the Defense Waste Processing Facility on the Savannah River Site. FY 1989--1990 annual report

    Energy Technology Data Exchange (ETDEWEB)

    Pechmann, J.H.K.; Scott, D.E.; McGregor, J.H.; Estes, R.A.; Chazal, A.C.

    1993-02-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980`s. The Savannah River Ecology Laboratory (SREL) has completed 12 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ``refuge ponds`` as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10CFR1022).

  5. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY-1991 and FY-1992

    Energy Technology Data Exchange (ETDEWEB)

    Scott, D.E.; Chazel, A.C.; Pechmann, J.H.K.; Estes, R.A.

    1993-06-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980`s. The Savannah River Ecology Laboratory (SREL) has completed 14 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPF site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ``refuge ponds`` as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022).

  6. Draft environmental impact statement siting, construction, and operation of New Production Reactor capacity. Volume 4, Appendices D-R

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.

  7. Constructing sites at a large scale - towards new design (education) methods

    DEFF Research Database (Denmark)

    Braae, Ellen Marie; Tietjen, Anne

    2010-01-01

    of the design disciplines within the development of our urban landscapes. At the same time, urban and landscape designers are confronted with new methodological problems. Within a strategic transformation perspective the formulation of the design problem or brief becomes an integrated part of the design process......Since the 1990s the regional scale has regained importance in urban and landscape design. In parallel, the focus in design tasks has shifted from master plans for urban extension to strategic urban transformation projects. The current paradigm of planning by projects reinforces the role....... This paper discusses new design (education) methods based on a relational concept of urban sites and design processes using the actor-network-theory as theoretical frame....

  8. The ATLAS Distributed Data Management project: Past and Future

    CERN Document Server

    Garonne, V; The ATLAS collaboration; Lassnig, M; Molfetas, A; Barisits, M; Beermann, T; Nairz, A; Goossens, L; Barreiro Megino, F; Serfon, C; Oleynik, D; Petrosyan, A

    2012-01-01

    ATLAS has recorded almost 8PB of RAW data since the LHC started running at the end of 2009. Many more derived data products and complimentary simulation data have also been produced by the collaboration and, in total, 90PB is currently stored in the Worldwide LHC Computing Grid by ATLAS. All this data is managed by the ATLAS Distributed Data Management system, called Don Quijote 2 (DQ2). DQ2 has evolved rapidly to help ATLAS Computing operations manage these large quantities of data across the many grid sites at which ATLAS runs, and to help ATLAS physicists get access to this data. In this paper, we describe new and improved DQ2 services, and the experience of data management operation in ATLAS computing, showing how these services enable the management of petabyte scale computing operations. We also present the concepts of the new version of the ATLAS Distributed Data Management (DDM) system, Rucio.

  9. The ATLAS Distributed Data Management project: Past and Future

    International Nuclear Information System (INIS)

    Garonne, Vincent; Stewart, Graeme A; Lassnig, Mario; Molfetas, Angelos; Barisits, Martin; Beermann, Thomas; Nairz, Armin; Goossens, Luc; Barreiro Megino, Fernando; Serfon, Cedric; Oleynik, Danila; Petrosyan, Artem

    2012-01-01

    ATLAS has recorded more than 8 petabyte(PB) of RAW data since the LHC started running at the end of 2009. Many more derived data products and complimentary simulation data have also been produced by the collaboration and, in total, 90PB are currently stored in the Worldwide LHC Computing Grid by ATLAS. All these data are managed by the ATLAS Distributed Data Management system, called Don Quijote 2 (DQ2). DQ2 has evolved rapidly to help ATLAS Computing operations manage these large quantities of data across the many grid sites at which ATLAS runs, and to help ATLAS physicists get access to these data. In this paper, we describe new and improved DQ2 services, and the experience of data management operation in ATLAS computing, showing how these services enable the management of PB scale computing operations. We also present the concepts of the new version of the ATLAS Distributed Data Management (DDM) system, Rucio.

  10. The ATLAS Distributed Data Management project: Past and Future

    Science.gov (United States)

    Garonne, Vincent; Stewart, Graeme A.; Lassnig, Mario; Molfetas, Angelos; Barisits, Martin; Beermann, Thomas; Nairz, Armin; Goossens, Luc; Barreiro Megino, Fernando; Serfon, Cedric; Oleynik, Danila; Petrosyan, Artem

    2012-12-01

    ATLAS has recorded more than 8 petabyte(PB) of RAW data since the LHC started running at the end of 2009. Many more derived data products and complimentary simulation data have also been produced by the collaboration and, in total, 90PB are currently stored in the Worldwide LHC Computing Grid by ATLAS. All these data are managed by the ATLAS Distributed Data Management system, called Don Quijote 2 (DQ2). DQ2 has evolved rapidly to help ATLAS Computing operations manage these large quantities of data across the many grid sites at which ATLAS runs, and to help ATLAS physicists get access to these data. In this paper, we describe new and improved DQ2 services, and the experience of data management operation in ATLAS computing, showing how these services enable the management of PB scale computing operations. We also present the concepts of the new version of the ATLAS Distributed Data Management (DDM) system, Rucio.

  11. Support system for ATLAS distributed computing operations

    CERN Document Server

    Kishimoto, Tomoe; The ATLAS collaboration

    2018-01-01

    The ATLAS distributed computing system has allowed the experiment to successfully meet the challenges of LHC Run 2. In order for distributed computing to operate smoothly and efficiently, several support teams are organized in the ATLAS experiment. The ADCoS (ATLAS Distributed Computing Operation Shifts) is a dedicated group of shifters who follow and report failing jobs, failing data transfers between sites, degradation of ATLAS central computing services, and more. The DAST (Distributed Analysis Support Team) provides user support to resolve issues related to running distributed analysis on the grid. The CRC (Computing Run Coordinator) maintains a global view of the day-to-day operations. In this presentation, the status and operational experience of the support system for ATLAS distributed computing in LHC Run 2 will be reported. This report also includes operations experience from the grid site point of view, and an analysis of the errors that create the biggest waste of wallclock time. The report of oper...

  12. The ATLAS distributed analysis system

    International Nuclear Information System (INIS)

    Legger, F

    2014-01-01

    In the LHC operations era, analysis of the multi-petabyte ATLAS data sample by globally distributed physicists is a challenging task. To attain the required scale the ATLAS Computing Model was designed around the concept of Grid computing, realized in the Worldwide LHC Computing Grid (WLCG), the largest distributed computational resource existing in the sciences. The ATLAS experiment currently stores over 140 PB of data and runs about 140,000 concurrent jobs continuously at WLCG sites. During the first run of the LHC, the ATLAS Distributed Analysis (DA) service has operated stably and scaled as planned. More than 1600 users submitted jobs in 2012, with 2 million or more analysis jobs per week, peaking at about a million jobs per day. The system dynamically distributes popular data to expedite processing and maximally utilize resources. The reliability of the DA service is high and steadily improving; Grid sites are continually validated against a set of standard tests, and a dedicated team of expert shifters provides user support and communicates user problems to the sites. Both the user support techniques and the direct feedback of users have been effective in improving the success rate and user experience when utilizing the distributed computing environment. In this contribution a description of the main components, activities and achievements of ATLAS distributed analysis is given. Several future improvements being undertaken will be described.

  13. The ATLAS distributed analysis system

    Science.gov (United States)

    Legger, F.; Atlas Collaboration

    2014-06-01

    In the LHC operations era, analysis of the multi-petabyte ATLAS data sample by globally distributed physicists is a challenging task. To attain the required scale the ATLAS Computing Model was designed around the concept of Grid computing, realized in the Worldwide LHC Computing Grid (WLCG), the largest distributed computational resource existing in the sciences. The ATLAS experiment currently stores over 140 PB of data and runs about 140,000 concurrent jobs continuously at WLCG sites. During the first run of the LHC, the ATLAS Distributed Analysis (DA) service has operated stably and scaled as planned. More than 1600 users submitted jobs in 2012, with 2 million or more analysis jobs per week, peaking at about a million jobs per day. The system dynamically distributes popular data to expedite processing and maximally utilize resources. The reliability of the DA service is high and steadily improving; Grid sites are continually validated against a set of standard tests, and a dedicated team of expert shifters provides user support and communicates user problems to the sites. Both the user support techniques and the direct feedback of users have been effective in improving the success rate and user experience when utilizing the distributed computing environment. In this contribution a description of the main components, activities and achievements of ATLAS distributed analysis is given. Several future improvements being undertaken will be described.

  14. Radon exhalation of hardening concrete: monitoring cement hydration and prediction of radon concentration in construction site.

    Science.gov (United States)

    Kovler, Konstantin

    2006-01-01

    The unique properties of radon as a noble gas are used for monitoring cement hydration and microstructural transformations in cementitious system. It is found that the radon concentration curve for hydrating cement paste enclosed in the chamber increases from zero (more accurately - background) concentrations, similar to unhydrated cement. However, radon concentrations developed within 3 days in the test chamber containing cement paste were approximately 20 times higher than those of unhydrated cement. This fact proves the importance of microstructural transformations taking place in the process of cement hydration, in comparison with cement grain, which is a time-stable material. It is concluded that monitoring cement hydration by means of radon exhalation method makes it possible to distinguish between three main stages, which are readily seen in the time dependence of radon concentration: stage I (dormant period), stage II (setting and intensive microstructural transformations) and stage III (densification of the structure and drying). The information presented improves our understanding of the main physical mechanisms resulting in the characteristic behavior of radon exhalation in the course of cement hydration. The maximum value of radon exhalation rate observed, when cement sets, can reach 0.6 mBq kg(-1) s(-1) and sometimes exceeds 1.0 mBq kg(-1) s(-1). These values exceed significantly to those known before for cementitious materials. At the same time, the minimum ventilation rate accepted in the design practice (0.5 h(-1)), guarantees that the concentrations in most of the cases will not exceed the action level and that they are not of any radiological concern for construction workers employed in concreting in closed spaces.

  15. Cross-site comparison of ribosomal depletion kits for Illumina RNAseq library construction.

    Science.gov (United States)

    Herbert, Zachary T; Kershner, Jamie P; Butty, Vincent L; Thimmapuram, Jyothi; Choudhari, Sulbha; Alekseyev, Yuriy O; Fan, Jun; Podnar, Jessica W; Wilcox, Edward; Gipson, Jenny; Gillaspy, Allison; Jepsen, Kristen; BonDurant, Sandra Splinter; Morris, Krystalynne; Berkeley, Maura; LeClerc, Ashley; Simpson, Stephen D; Sommerville, Gary; Grimmett, Leslie; Adams, Marie; Levine, Stuart S

    2018-03-15

    Ribosomal RNA (rRNA) comprises at least 90% of total RNA extracted from mammalian tissue or cell line samples. Informative transcriptional profiling using massively parallel sequencing technologies requires either enrichment of mature poly-adenylated transcripts or targeted depletion of the rRNA fraction. The latter method is of particular interest because it is compatible with degraded samples such as those extracted from FFPE and also captures transcripts that are not poly-adenylated such as some non-coding RNAs. Here we provide a cross-site study that evaluates the performance of ribosomal RNA removal kits from Illumina, Takara/Clontech, Kapa Biosystems, Lexogen, New England Biolabs and Qiagen on intact and degraded RNA samples. We find that all of the kits are capable of performing significant ribosomal depletion, though there are differences in their ease of use. All kits were able to remove ribosomal RNA to below 20% with intact RNA and identify ~ 14,000 protein coding genes from the Universal Human Reference RNA sample at >1FPKM. Analysis of differentially detected genes between kits suggests that transcript length may be a key factor in library production efficiency. These results provide a roadmap for labs on the strengths of each of these methods and how best to utilize them.

  16. Practical data collection : establishing methods and procedures for measuring water clarity and turbidity of storm water run-off from active major highway construction sites.

    Science.gov (United States)

    2014-09-12

    In anticipation of regulation involving numeric turbidity limit at highway construction sites, research was : done into the most appropriate, affordable methods for surface water monitoring. Measuring sediment : concentration in streams may be conduc...

  17. The GNAM system in the ATLAS online monitoring framework

    Energy Technology Data Exchange (ETDEWEB)

    Salvatore, D. [INFN Cosenza and Dip. di Fisica, Universita della Calabria, ponte P. Bucci 31 C, 87036 Rende (Italy)], E-mail: daniela.salvatore@cern.ch; Adragna, P. [Queen Mary, University of London, London (United Kingdom); Bosman, M. [IFAE, Institut de Fisica de Altes Energies, UAB/Barcelona (Spain); Burckhart, D. [CERN, Geneva (Switzerland); Caprini, M. [National Institute for Physics and Nuclear Engineering, Bucharest (Romania); Corso-Radu, A. [University of California Irvine, Irvine, California (United States); Costa, M.J. [CERN, Geneva (Switzerland); Della Pietra, M. [INFN Sezione diNapoli, Napoli (Italy); Dotti, A. [Universita and INFN Pisa, Pisa (Italy); Eschrich, I. [University of California Irvine, Irvine, California (United States); Ferrari, R. [INFN Sezione di Pavia, Pavia (Italy); Ferrer, M.L. [INFN Laboratori Nazionali di Frascati, Frascati (Italy); Gaudio, G. [INFN Sezione di Pavia, Pavia (Italy); Hadavand, H. [Southern Methodist University, Dallas (United States); Hauschild, M. [CERN, Geneva (Switzerland); Hillier, S. [University of Birmingham, Birmingham (United Kingdom); Kehoe, B. [Southern Methodist University, Dallas (United States); Kolos, S. [University of California Irvine, Irvine, California (United States); Kordas, K. [INFN Laboratori Nazionali di Frascati, Frascati (Italy); Mcpherson, R. [University of Victoria, Vancouver (Canada)] (and others)

    2007-10-15

    ATLAS [ATLAS Collaboration, 'ATLAS Technical Proposal', CERN/LHHCC/94-43, LHCC/P2, CERN, Geneva, Switzerland, 1994] is one of the four experiments under construction along the Large Hadron Collider (LHC) ring, which will produce interactions at a center of mass energy of 14 TeV at 40 MHz rate. The detector consists of more than 140 million electronic channels. The challenging experimental environment and the extreme detector complexity impose the necessity of a common scalable distributed monitoring framework, which can be tuned for the optimal use by different ATLAS detectors at the various levels of the ATLAS data flow.

  18. The GNAM system in the ATLAS online monitoring framework

    Energy Technology Data Exchange (ETDEWEB)

    Salvatore, D. [INFN Cosenza and Dip. di Fisica, Universita della Calabria, ponte P. Bucci 31 C, 87036 Rende (Italy)], E-mail: daniela.salvatore@cern.ch; Adragna, P [Queen Mary, University of London, London (United Kingdom); Bosman, M [IFAE, Institut de Fisica de Altes Energies, UAB/Barcelona (Spain); Burckhart, D [CERN, Geneva (Switzerland); Caprini, M [National Institute for Physics and Nuclear Engineering, Bucharest (Romania); Corso-Radu, A [University of California Irvine, Irvine, California (United States); Costa, M J [CERN, Geneva (Switzerland); Della Pietra, M [INFN Sezione diNapoli, Napoli (Italy); Dotti, A [Universita and INFN Pisa, Pisa (Italy); Eschrich, I [University of California Irvine, Irvine, California (United States); Ferrari, R [INFN Sezione di Pavia, Pavia (Italy); Ferrer, M L [INFN Laboratori Nazionali di Frascati, Frascati (Italy); Gaudio, G [INFN Sezione di Pavia, Pavia (Italy); Hadavand, H [Southern Methodist University, Dallas (United States); Hauschild, M [CERN, Geneva (Switzerland); Hillier, S [University of Birmingham, Birmingham (United Kingdom); Kehoe, B [Southern Methodist University, Dallas (United States); Kolos, S [University of California Irvine, Irvine, California (United States); Kordas, K [INFN Laboratori Nazionali di Frascati, Frascati (Italy); Mcpherson, R [University of Victoria, Vancouver (Canada)

    2007-10-15

    ATLAS [ATLAS Collaboration, 'ATLAS Technical Proposal', CERN/LHHCC/94-43, LHCC/P2, CERN, Geneva, Switzerland, 1994] is one of the four experiments under construction along the Large Hadron Collider (LHC) ring, which will produce interactions at a center of mass energy of 14 TeV at 40 MHz rate. The detector consists of more than 140 million electronic channels. The challenging experimental environment and the extreme detector complexity impose the necessity of a common scalable distributed monitoring framework, which can be tuned for the optimal use by different ATLAS detectors at the various levels of the ATLAS data flow.

  19. The GNAM system in the ATLAS online monitoring framework

    International Nuclear Information System (INIS)

    Salvatore, D.; Adragna, P.; Bosman, M.; Burckhart, D.; Caprini, M.; Corso-Radu, A.; Costa, M.J.; Della Pietra, M.; Dotti, A.; Eschrich, I.; Ferrari, R.; Ferrer, M.L.; Gaudio, G.; Hadavand, H.; Hauschild, M.; Hillier, S.; Kehoe, B.; Kolos, S.; Kordas, K.; Mcpherson, R.

    2007-01-01

    ATLAS [ATLAS Collaboration, 'ATLAS Technical Proposal', CERN/LHHCC/94-43, LHCC/P2, CERN, Geneva, Switzerland, 1994] is one of the four experiments under construction along the Large Hadron Collider (LHC) ring, which will produce interactions at a center of mass energy of 14 TeV at 40 MHz rate. The detector consists of more than 140 million electronic channels. The challenging experimental environment and the extreme detector complexity impose the necessity of a common scalable distributed monitoring framework, which can be tuned for the optimal use by different ATLAS detectors at the various levels of the ATLAS data flow

  20. Mindboggle: Automated brain labeling with multiple atlases

    International Nuclear Information System (INIS)

    Klein, Arno; Mensh, Brett; Ghosh, Satrajit; Tourville, Jason; Hirsch, Joy

    2005-01-01

    To make inferences about brain structures or activity across multiple individuals, one first needs to determine the structural correspondences across their image data. We have recently developed Mindboggle as a fully automated, feature-matching approach to assign anatomical labels to cortical structures and activity in human brain MRI data. Label assignment is based on structural correspondences between labeled atlases and unlabeled image data, where an atlas consists of a set of labels manually assigned to a single brain image. In the present work, we study the influence of using variable numbers of individual atlases to nonlinearly label human brain image data. Each brain image voxel of each of 20 human subjects is assigned a label by each of the remaining 19 atlases using Mindboggle. The most common label is selected and is given a confidence rating based on the number of atlases that assigned that label. The automatically assigned labels for each subject brain are compared with the manual labels for that subject (its atlas). Unlike recent approaches that transform subject data to a labeled, probabilistic atlas space (constructed from a database of atlases), Mindboggle labels a subject by each atlas in a database independently. When Mindboggle labels a human subject's brain image with at least four atlases, the resulting label agreement with coregistered manual labels is significantly higher than when only a single atlas is used. Different numbers of atlases provide significantly higher label agreements for individual brain regions. Increasing the number of reference brains used to automatically label a human subject brain improves labeling accuracy with respect to manually assigned labels. Mindboggle software can provide confidence measures for labels based on probabilistic assignment of labels and could be applied to large databases of brain images

  1. Construction of an environmental pollution map for some industrial sites using some bio-indicators

    International Nuclear Information System (INIS)

    Helalyel, M.A.M.

    2008-01-01

    The present work deals with an environmental pollution through determination of the heavy metal pollutants namely Cd,Co,Cu,Fe,Mn,Ni,Pb and Zn which are known to cause hazard to plants and animals in water, soil and plants at different sites in Helwan and El-Tibben as old industrial areas and Toshki as pre-industrial area. In addition to, study physico-parameters of water, major anions and major cations. The thesis is divided into four main chapters (introduction, experimental, results and discussion, and comparison between Toshki, Helwan and el-Tibben)in addition to summary and conclusion, references, abstract and arabic summary. The first chapter of the thesis comprises the general introduction, which gives introduction on the subject under investigation . Also contains a brief account on the environmental pollution of water, soil and plants in addition to the impact of industrial pollution in egypt , previous work on heavy metal pollutants then the characteristic of the investigated heavy metal pollutants and natural radioactivity for the soil of the investigated areas. The second chapter contains a description of selected areas, the methodology of sampling, sample preparation for water, soil and plant and method of analysis of the selected heavy metals. The third chapter involves the results and discussion . The results revealed physico-chemical parameters measured in water samples collected from investigated areas as temperature, ph, dissolved oxygen(DO), biochemical oxygen demand (BOD) , and total alkalinity as well as determination of the major anions and cations in water samples collected from investigated areas. Heavy metals determined in water, soil and plants in addition to natural radioactivity in soil samples for each of the studied industrial cities, Helwan, el-ti been and Toshki

  2. ATLAS cloud R and D

    International Nuclear Information System (INIS)

    Panitkin, Sergey; Bejar, Jose Caballero; Hover, John; Zaytsev, Alexander; Megino, Fernando Barreiro; Girolamo, Alessandro Di; Kucharczyk, Katarzyna; Llamas, Ramon Medrano; Benjamin, Doug; Gable, Ian; Paterson, Michael; Sobie, Randall; Taylor, Ryan; Hendrix, Val; Love, Peter; Ohman, Henrik; Walker, Rodney

    2014-01-01

    The computing model of the ATLAS experiment was designed around the concept of grid computing and, since the start of data taking, this model has proven very successful. However, new cloud computing technologies bring attractive features to improve the operations and elasticity of scientific distributed computing. ATLAS sees grid and cloud computing as complementary technologies that will coexist at different levels of resource abstraction, and two years ago created an R and D working group to investigate the different integration scenarios. The ATLAS Cloud Computing R and D has been able to demonstrate the feasibility of offloading work from grid to cloud sites and, as of today, is able to integrate transparently various cloud resources into the PanDA workload management system. The ATLAS Cloud Computing R and D is operating various PanDA queues on private and public resources and has provided several hundred thousand CPU days to the experiment. As a result, the ATLAS Cloud Computing R and D group has gained a significant insight into the cloud computing landscape and has identified points that still need to be addressed in order to fully utilize this technology. This contribution will explain the cloud integration models that are being evaluated and will discuss ATLAS' learning during the collaboration with leading commercial and academic cloud providers.

  3. ATLAS Cloud R&D

    Science.gov (United States)

    Panitkin, Sergey; Barreiro Megino, Fernando; Caballero Bejar, Jose; Benjamin, Doug; Di Girolamo, Alessandro; Gable, Ian; Hendrix, Val; Hover, John; Kucharczyk, Katarzyna; Medrano Llamas, Ramon; Love, Peter; Ohman, Henrik; Paterson, Michael; Sobie, Randall; Taylor, Ryan; Walker, Rodney; Zaytsev, Alexander; Atlas Collaboration

    2014-06-01

    The computing model of the ATLAS experiment was designed around the concept of grid computing and, since the start of data taking, this model has proven very successful. However, new cloud computing technologies bring attractive features to improve the operations and elasticity of scientific distributed computing. ATLAS sees grid and cloud computing as complementary technologies that will coexist at different levels of resource abstraction, and two years ago created an R&D working group to investigate the different integration scenarios. The ATLAS Cloud Computing R&D has been able to demonstrate the feasibility of offloading work from grid to cloud sites and, as of today, is able to integrate transparently various cloud resources into the PanDA workload management system. The ATLAS Cloud Computing R&D is operating various PanDA queues on private and public resources and has provided several hundred thousand CPU days to the experiment. As a result, the ATLAS Cloud Computing R&D group has gained a significant insight into the cloud computing landscape and has identified points that still need to be addressed in order to fully utilize this technology. This contribution will explain the cloud integration models that are being evaluated and will discuss ATLAS' learning during the collaboration with leading commercial and academic cloud providers.

  4. De l'expérience ALEPH au LEP à la construction du détecteur ATLAS auprès du LHC

    CERN Document Server

    Martin, Franck

    This document summarizes ten years of activities in the field of experimental particle physics, which I have done just after my PhD defense in 1999. After a short introduction describing my PhD work and my activities during these ten years, the first chapter describes an analysis made in the ALEPH experiment about the measurement of the Bose-Einstein correlations in W pair decays, using an event mixing method. Nevertheless, the main part of the text is dedicated to the work I have done in the ATLAS experiment at the LHC, between the years 2000 and 2010. Four parts are distinguished. First, an analysis concerning some searches for possible supersymmetric top decays with R-parity violation is described. Then a second part is written about the test bench of the tile calorimeter front-end electronics, and its installation in the ATLAS experiment. Third, the work done in the transition radiation tracker concerning the validation and the installation of the endcap front-end electronics is fully explained. End, the ...

  5. ATLAS DQ2 Deletion Service

    International Nuclear Information System (INIS)

    Oleynik, Danila; Petrosyan, Artem; Garonne, Vincent; Campana, Simone

    2012-01-01

    The ATLAS Distributed Data Management project DQ2 is responsible for the replication, access and bookkeeping of ATLAS data across more than 100 distributed grid sites. It also enforces data management policies decided on by the collaboration and defined in the ATLAS computing model. The DQ2 Deletion Service is one of the most important DDM services. This distributed service interacts with 3rd party grid middleware and the DQ2 catalogues to serve data deletion requests on the grid. Furthermore, it also takes care of retry strategies, check-pointing transactions, load management and fault tolerance. In this paper special attention is paid to the technical details which are used to achieve the high performance of service, accomplished without overloading either site storage, catalogues or other DQ2 components. Special attention is also paid to the deletion monitoring service that allows operators a detailed view of the working system.

  6. Construction of a high-density genetic map for grape using next generation restriction-site associated DNA sequencing

    Directory of Open Access Journals (Sweden)

    Wang Nian

    2012-08-01

    Full Text Available Abstract Background Genetic mapping and QTL detection are powerful methodologies in plant improvement and breeding. Construction of a high-density and high-quality genetic map would be of great benefit in the production of superior grapes to meet human demand. High throughput and low cost of the recently developed next generation sequencing (NGS technology have resulted in its wide application in genome research. Sequencing restriction-site associated DNA (RAD might be an efficient strategy to simplify genotyping. Combining NGS with RAD has proven to be powerful for single nucleotide polymorphism (SNP marker development. Results An F1 population of 100 individual plants was developed. In-silico digestion-site prediction was used to select an appropriate restriction enzyme for construction of a RAD sequencing library. Next generation RAD sequencing was applied to genotype the F1 population and its parents. Applying a cluster strategy for SNP modulation, a total of 1,814 high-quality SNP markers were developed: 1,121 of these were mapped to the female genetic map, 759 to the male map, and 1,646 to the integrated map. A comparison of the genetic maps to the published Vitis vinifera genome revealed both conservation and variations. Conclusions The applicability of next generation RAD sequencing for genotyping a grape F1 population was demonstrated, leading to the successful development of a genetic map with high density and quality using our designed SNP markers. Detailed analysis revealed that this newly developed genetic map can be used for a variety of genome investigations, such as QTL detection, sequence assembly and genome comparison.

  7. The ATLAS IBL CO2 Cooling System

    CERN Document Server

    Verlaat, Bartholomeus; The ATLAS collaboration

    2016-01-01

    The Atlas Pixel detector has been equipped with an extra B-layer in the space obtained by a reduced beam pipe. This new pixel detector called the ATLAS Insertable B-Layer (IBL) is installed in 2014 and is operational in the current ATLAS data taking. The IBL detector is cooled with evaporative CO2 and is the first of its kind in ATLAS. The ATLAS IBL CO2 cooling system is designed for lower temperature operation (<-35⁰C) than the previous developed CO2 cooling systems in High Energy Physics experiments. The cold temperatures are required to protect the pixel sensors for the high expected radiation dose up to 550 fb^-1 integrated luminosity. This paper describes the design, development, construction and commissioning of the IBL CO2 cooling system. It describes the challenges overcome and the important lessons learned for the development of future systems which are now under design for the Phase-II upgrade detectors.

  8. Construction and operation of a tritium extraction facility at the Savannah River Site. Final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    DOE proposes to construct and operate a Tritium Extraction Facility (TEF) at H Area on the Savannah River Site (SRS) to provide the capability to extract tritium from commercial light water reactor (CLWR) targets and from targets of similar design. The proposed action is also DOE's preferred alternative. An action alternative is to construct and operate TEF at the Allied General Nuclear Services facility, which is adjacent to the eastern side of the SRS. Under the no-action alternative DOE could incorporate tritium extraction capabilities in the accelerator for production of tritium. This EIS is linked to the Final Programmatic Environmental Impact Statement for Tritium Supply and Recycling, from which DOE determined that it would produce tritium either in an accelerator or in a commercial light water reactor. The purpose of the proposed action and alternatives evaluated in this EIS is to provide tritium extraction capability to support either tritium production technology. The EIS assesses the environmental impacts from the proposed action and the alternatives, including the no action alternative

  9. Construction and expression of hepatitis B surface antigen escape variants within the "a" determinant by site directed mutagenesis.

    Science.gov (United States)

    Golsaz Shirazi, Forough; Amiri, Mohammad Mehdi; Mohammadi, Hamed; Bayat, Ali Ahmad; Roohi, Azam; Khoshnoodi, Jalal; Zarnani, Amir Hassan; Jeddi-Tehrani, Mahmood; Kardar, Gholam Ali; Shokri, Fazel

    2013-09-01

    The antibody response to hepatitis B surface antigen (HBsAg) controls hepatitis B virus infection. The "a" determinant of HBsAg is the most important target for protective antibody response, diagnosis and immunoprophylaxis. Mutations in this area may induce immune escape mutants and affect the performance of HBsAg assays. To construct clinically relevant recombinant mutant forms of HBsAg and assessment of their reactivity with anti-HBs monoclonal antibodies (MAbs). Wild type (wt) and mutant (mt) HBsAg genes were constructed by site directed mutagenesis and SEOing PCR. The amplified genes were inserted into pCMV6-neo plasmid and transfected in CHO cell line. The expression of wt- and mtHBsAg was assessed by commercial ELISA assays and stable cells were established and cloned by limiting dilution. The recombinant mutants were further characterized using a panel of anti-HBs monoclonal antibodies (MAbs) and the pattern of their reactivity was assessed by ELISA. Ten HBsAg mutants having single mutation within the "a" determinant including P120E, T123N, Q129H, M133L, K141E, P142S, D144A, G145R, N146S and C147S together with a wt form were successfully constructed and expressed in CHO cells. Reactivity of anti-HBs MAbs with mtHBsAgs displayed different patterns. The effect of mutations on antibody binding differed depending on the amino acid involved and its location within the ''a'' determinant. Mutation at amino acids 123 and 145 resulted in either complete loss or significant reduction of binding to all anti-HBs MAbs. Our panel of mtHBsAgs is a valuable tool for assessment of the antibody response to HBV escape mutants and may have substantial implications in HBV immunological diagnostics.

  10. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY-1994 and FY-1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The Savannah River Ecology Laboratory initiated ecological studies related to the construction of the DWPF on the SRS in FY-1979. Two areas have been used for biological surveys and long-term monitoring: the DWPF construction site (S-Area and Z-Area), and two control sites (Rainbow Bay and Tinker Creek). The Rainbow Bay study area and S-Area are located within 5 km of each other on the SRS, and both once contained Carolina bays which were very similar ecologically. One goal of the SREL`s faunal studies is to compare the natural variation in amphibian populations at the Rainbow Bay control site to the variation observed at the human-altered site (Sun Bay, formerly on the DWPF construction site). Pre-construction biological surveys included data on vegetation, birds, mammals, amphibians, reptiles, fish and several invertebrate groups. No species on the Federal Endangered or Threatened lists were found on either site, but several plants and animals of threatened or special-concern status in South Carolina were present and the gopher frog (Rana areolata) currently is being considered for federal listing. Continuing studies are directed towards assessing construction impacts on the biota and towares modeling the effects of alteration of wetland hydroperiod on the biota. Primary emphasis is being paced on evaluation the effectiveness of mitigation measures undertaken by DOE.

  11. The ATLAS semiconductor tracker (SCT)

    International Nuclear Information System (INIS)

    Jackson, J.N.

    2005-01-01

    The ATLAS detector (CERN,LHCC,94-43 (1994)) is designed to study a wide range of physics at the CERN Large Hadron Collider (LHC) at luminosities up to 10 34 cm -2 s -1 with a bunch-crossing rate of 40 MHz. The Semiconductor Tracker (SCT) forms a key component of the Inner Detector (vol. 1, ATLAS TDR 4, CERN,LHCC 97-16 (1997); vol. 2, ATLAS TDR 5, CERN,LHCC 97-17 (1997)) which is situated inside a 2 T solenoid field. The ATLAS Semiconductor Tracker (SCT) utilises 4088 silicon modules with binary readout mounted on carbon fibre composite structures arranged in the forms of barrels in the central region and discs in the forward region. The construction of the SCT is now well advanced. The design of the SCT modules, services and support structures will be briefly outlined. A description of the various stages in the construction process will be presented with examples of the performance achieved and the main difficulties encountered. Finally, the current status of the construction is reviewed

  12. The ATLAS positive ion injector

    International Nuclear Information System (INIS)

    Shepard, K.W.; Bollinger, L.M.; Pardo, R.C.

    1990-01-01

    This paper reviews the design, construction status, and beam tests to date of the positive ion injector (PII) which is replacing the tandem injector for the ATLAS heavy-ion facility. PII consists of an ECR ion source on a 350 KV platform injecting a very low velocity superconducting linac. The linac is composed of an independently-phased array of superconducting four-gap interdigital resonators which accelerate over a velocity range of .006 to .05c. In finished form, PII will be able to inject ions as heavy as uranium into the existing ATLAS linac. Although at the present time little more than 50% of the linac is operational, the indenpently-phased array is sufficiently flexible that ions in the lower half of the periodic table can be accelerated and injected into ATLAS. Results of recent operational experience will be discussed. 5 refs

  13. The ATLAS Detector Control System

    CERN Document Server

    Schlenker, S; Kersten, S; Hirschbuehl, D; Braun, H; Poblaguev, A; Oliveira Damazio, D; Talyshev, A; Zimmermann, S; Franz, S; Gutzwiller, O; Hartert, J; Mindur, B; Tsarouchas, CA; Caforio, D; Sbarra, C; Olszowska, J; Hajduk, Z; Banas, E; Wynne, B; Robichaud-Veronneau, A; Nemecek, S; Thompson, PD; Mandic, I; Deliyergiyev, M; Polini, A; Kovalenko, S; Khomutnikov, V; Filimonov, V; Bindi, M; Stanecka, E; Martin, T; Lantzsch, K; Hoffmann, D; Huber, J; Mountricha, E; Santos, HF; Ribeiro, G; Barillari, T; Habring, J; Arabidze, G; Boterenbrood, H; Hart, R; Marques Vinagre, F; Lafarguette, P; Tartarelli, GF; Nagai, K; D'Auria, S; Chekulaev, S; Phillips, P; Ertel, E; Brenner, R; Leontsinis, S; Mitrevski, J; Grassi, V; Karakostas, K; Iakovidis, G.; Marchese, F; Aielli, G

    2011-01-01

    The ATLAS experiment is one of the multi-purpose experiments at the Large Hadron Collider (LHC), constructed to study elementary particle interactions in collisions of high-energy proton beams. Twelve different sub-detectors as well as the common experimental infrastructure are supervised by the Detector Control System (DCS). The DCS enables equipment supervision of all ATLAS sub-detectors by using a system of >130 server machines running the industrial SCADA product PVSS. This highly distributed system reads, processes and archives of the order of 106 operational parameters. Higher level control system layers allow for automatic control procedures, efficient error recognition and handling, and manage the communication with external systems such as the LHC. This contribution firstly describes the status of the ATLAS DCS and the experience gained during the LHC commissioning and the first physics data taking operation period. Secondly, the future evolution and maintenance constraints for the coming years an...

  14. The ATLAS positive ion injector

    Energy Technology Data Exchange (ETDEWEB)

    Shepard, K.W.; Bollinger, L.M.; Pardo, R.C.

    1990-01-01

    This paper reviews the design, construction status, and beam tests to date of the positive ion injector (PII) which is replacing the tandem injector for the ATLAS heavy-ion facility. PII consists of an ECR ion source on a 350 KV platform injecting a very low velocity superconducting linac. The linac is composed of an independently-phased array of superconducting four-gap interdigital resonators which accelerate over a velocity range of .006 to .05c. In finished form, PII will be able to inject ions as heavy as uranium into the existing ATLAS linac. Although at the present time little more than 50% of the linac is operational, the indenpently-phased array is sufficiently flexible that ions in the lower half of the periodic table can be accelerated and injected into ATLAS. Results of recent operational experience will be discussed. 5 refs.

  15. Civil Engineering Construction of Underground Works

    CERN Document Server

    Rammer, H

    1999-01-01

    For the first time at CERN, new shafts and caverns will be excavated inside a surface building. The LHC civil engineering construction for the ATLAS experiment has been designed such that the experimental hall will be completed to the extent that it can provide a secure, weatherproof and sound insulated covering to the shaft excavation area. The construction of the two access shafts and the experimental cavern will follow and will be carried out inside the building. This unconventional method of working allows the excavation of the Molasse rock in the dry, which is essential for this type of rock, and ensures reduced environmental pollution by noise and dust. The paper will present the technical infrastructure required for this particular construction method, explain its advantages and disadvantages, and compare it with a conventional method of underground excavations to be used on the same work site for the construction of the service cavern.

  16. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Pwer Station

    International Nuclear Information System (INIS)

    Ueyama, Koreyasu

    1982-01-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported. (Wakatsuki, Y.)

  17. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Ueyama, Koreyasu [Tokyo Electric Power Co., Inc. (Japan)

    1982-09-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported.

  18. An application of the Pareto method in surveys to diagnose managers' and workers' perception of occupational safety and health on selected Polish construction sites.

    Science.gov (United States)

    Obolewicz, Jerzy; Dąbrowski, Andrzej

    2017-11-16

    The construction industry is an important sector of the economy in Poland. According to the National Labour Inspectorate (PIP) data of 2014, the number of victims of fatal accidents in the construction sector amounted to 80 as compared with 187 injured in all other sectors of economy in Poland. This article presents the results of surveys on the impact of construction worker behaviour on the occupational safety and health outcomes. The surveys took into account the point of view of both construction site management (tactical level) and construction workers (operational level). For the analysis of results, the method of numerical taxonomy and Pareto charts was employed, which allowed the authors to identify the areas of occupational safety and health at both an operational and a tactical level, in which improvement actions needed to be proposed for workers employed in micro, small, medium and large construction enterprises.

  19. ATLAS Silicon Microstrip Tracker Operation and Performance

    CERN Document Server

    Nagai, K; The ATLAS collaboration

    2012-01-01

    The Semi-Conductor Tracker (SCT) is one of the key precision tracking devices in the ATLAS experiment at CERN Large Hadron Collider (LHC). The SCT was constructed of 4088 modules for a total of 6.3 million silicon strips and was installed into the ATLAS experiment in 2007. The SCT has been fully operational since then, and achieves a good tracking performance from the startup of the LHC operation.

  20. Operational Experience with the ATLAS Pixel Detector

    CERN Document Server

    Djama, Fares; The ATLAS collaboration

    2017-01-01

    Run 2 of the LHC collider sets new challenges to track and vertex reconstruction because of its higher energy, pileup and luminosity. The ATLAS tracking performance relies critically on the Pixel Detector. Therefore, in view of Run 2, the ATLAS collaboration has constructed the first 4-layer pixel detector in Particle Physics by installing a new pixel layer, called Insertable B-Layer (IBL). Operational experience and performance of the 4-layer Pixel Detector during Run 2 are presented.

  1. ATLAS Cloud R&D

    CERN Document Server

    Panitkin, S; The ATLAS collaboration; Caballero Bejar, J; Benjamin, D; DiGirolamo, A; Gable, I; Hendrix, V; Hover, J; Kucharczuk, K; Medrano LLamas, R; Love, P; Ohman, H; Paterson, M; Sobie, R; Taylor, R; Walker, R; Zaytsev, A

    2014-01-01

    The computing model of the ATLAS experiment was designed around the concept of grid computing and, since the start of data taking, this model has proven very successful. However, new cloud computing technologies bring attractive features to improve the operations and elasticity of scientific distributed computing. ATLAS sees grid and cloud computing as complementary technologies that will coexist at different levels of resource abstraction, and two years ago created an R&D working group to investigate the different integration scenarios. The ATLAS Cloud Computing R&D has been able to demonstrate the feasibility of offloading work from grid to cloud sites and, as of today, is able to integrate transparently various cloud resources into the PanDA workload management system. The ATLAS Cloud Computing R&D is operating various PanDA queues on private and public resources and has provided several hundred thousand CPU days to the experiment. As a result, the ATLAS Cloud Computing R&D group has gained...

  2. ATLAS Outreach Highlights

    CERN Document Server

    Cheatham, Susan; The ATLAS collaboration

    2016-01-01

    The ATLAS outreach team is very active, promoting particle physics to a broad range of audiences including physicists, general public, policy makers, students and teachers, and media. A selection of current outreach activities and new projects will be presented. Recent highlights include the new ATLAS public website and ATLAS Open Data, the very recent public release of 1 fb-1 of ATLAS data.

  3. ATLAS Thesis Award 2017

    CERN Multimedia

    Anthony, Katarina

    2018-01-01

    Winners of the ATLAS Thesis Award were presented with certificates and glass cubes during a ceremony on 22 February, 2018. They are pictured here with Karl Jakobs (ATLAS Spokesperson), Max Klein (ATLAS Collaboration Board Chair) and Katsuo Tokushuku (ATLAS Collaboration Board Deputy Chair).

  4. Radiation dose to construction workers at operating nuclear power plant sites. Volume 2. Appendices A--F. Final report, September 1975--September 1978

    International Nuclear Information System (INIS)

    Endres, G.W.R.; Shipler, D.B.

    1978-12-01

    These appendices contain the dosimetry procedures and details of the personnel and environmental dosimeters used for the Radiation Dose to Construction Workers at Operating Nuclear Power Plant Sites Study. A printout of the computer codes used to analyze dosimeter data is included along with all the raw data obtained. Appendices C through F contain computer output and log-normal plots of dosimetry data for environmental location and construction worker groups

  5. Changes in water quality of a small urban river triggered by deep drainage of a construction site

    Directory of Open Access Journals (Sweden)

    Bartnik Adam

    2016-12-01

    Full Text Available The paper presents the results of the monitoring of the selected physicochemical properties of the Jasień River waters (in Łódź, the third biggest city of Poland and their changes under the influence of drainage of a railway station Łódź Fabryczna construction site. Even 25 years ago the Jasień River was a receiver for the sewage from the Łódź textile factories. The drainage of the excavations and disposal of the water into the Jasień River was started on January 2014 and changed stable hydrological, physical and chemical regime of the river once again. In a consequence, average monthly flows exceeded the Jasień River flow in its upper section by six times, and at the beginning by even ten times. Chloride concentration was systematically growing over the study period. This growth and higher water pH were probably associated with increasing level of contaminants in the discharged water and its gradually decreasing uptake. Average annual water temperature increased and a decrease in its amplitude was observed. The annual conductivity and pH patterns became more uniform and the changes in pH followed a clear trend of monthly changes. Water turbidity increased by two times and during summer floods this parameter was often even a few times higher than before the drainage commenced. Chlorides improved water conductance and sodium and potassium increased basicity.

  6. Does Disposing of Construction and Demolition Debris in Unlined Landfills Impact Groundwater Quality? Evidence from 91 Landfill Sites in Florida.

    Science.gov (United States)

    Powell, Jon T; Jain, Pradeep; Smith, Justin; Townsend, Timothy G; Tolaymat, Thabet M

    2015-08-04

    More than 1,500 construction and demolition debris (CDD) landfills operate in the United States (U.S.), and U.S. federal regulations do not require containment features such as low-permeability liners and leachate collection systems for these facilities. Here we evaluate groundwater quality from samples collected in groundwater monitoring networks at 91 unlined, permitted CDD landfills in Florida, U.S. A total of 460,504 groundwater sample results were analyzed, with a median of 10 years of quarterly or semiannual monitoring data per site including more than 400 different chemical constituents. Downgradient concentrations of total dissolved solids, sulfate, chloride, iron, ammonia-nitrogen, and aluminum were greater than upgradient concentrations (p < 0.05). At downgradient wells where sulfate concentrations were greater than 150 mg/L (approximately 10% of the maximum dissolved sulfate concentration in water, which suggests the presence of leachate from the landfill), iron and arsenic were detected in 91% and 43% of samples, with median concentrations of 1,900 μg/L and 11 μg/L, respectively. These results show that although health-based standards can be exceeded at unlined CDD landfills, the magnitude of detected chemical concentrations is generally small and reflective of leached minerals from components (wood, concrete, and gypsum drywall) that comprise the bulk of discarded CDD by mass.

  7. Thermal calculations for the design, construction, operation, and evaluation of the Spent Fuel Test - Climax, Nevada Test Site

    International Nuclear Information System (INIS)

    Montan, D.N.; Patrick, W.C.

    1981-01-01

    The Spent Fuel Test-Climax (SFT-C) is a test of retrievable deep geologic storage of commercially generated spent nuclear reactor fuel in granitic rock. Eleven spent fuel assemblies, together with six electrical simulators and 20 guard heaters, are emplaced 420 m below the surface in the Climax granite at the US Department of Energy Nevada Test Site. On June 2, 1978 LLNL secured funding for the SFT-C, and completed spent fuel emplacement May 28, 1980. This report documents a series of thermal calculations that were performed in support of the SFT-C. Early calculations employed analytical solutions to address such design and construction issues as drift layout and emplacement hole spacings. Operational aspects of the test required more detailed numerical solutions dealing with ventilation and guard-heater power levels. The final set of calculations presented here provides temperature histories throughout the test facility for evaluation of the response of the SFT-C and for comparison of calculations with acquired data. This final set of calculations employs the as-built test geometry and best-available material properties

  8. Selecting, engineering and constructing drilling sites at the Geysers geothermal field. Geysers chinetsu ryoiki ni okeru kussaku shikichi no sentei engineering kochiku

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This paper describes some examples of selection, engineering and construction of drilling sites at the Geysers geothermal field in the northern district of California State. Steep landform, thin-layered soil and violent rainfall create unstable conditions bringing about numerous landslide in the field. Selection of a well drilling site appropriate in such conditions is started by analyzing the aerial photographs by technical staff. After site selection, prospecting and soil test are conducted and a working plan in the well site is decided to prepare engineering drawings. In the construction, land preparation, the open-cutting of base-line trench, etc. are carried out. The base-line trench is a large and sufficiently deep one which is open-cut to the front end or the middle of the bottom part of the well plateau. The final construction work is to build a leading casing for interpolating cementing. The well site construction in the Geysers geothermal field is done in consideration of protecting human life, health and properties. 1 fig.

  9. Economic and Environmental Evaluation of a Brick Delivery System Based on Multi-Trip Vehicle Loader Routing Problem for Small Construction Sites

    Directory of Open Access Journals (Sweden)

    Heungjo An

    2018-05-01

    Full Text Available While large construction sites have on-site loaders to handle heavy and large packages of bricks, small brick manufacturers employ a truck-mounted loader or sometimes deploy a loader truck to accompany normal brick delivery trucks to small construction sites lacking on-site loaders. It may be very challenging for small contractors to manage a sustainable delivery system that is both cost-effective and environmentally friendly. To address this issue, this paper proposes to solve a multi-trip vehicle loader routing problem by uniquely planning routes and schedules of several types of vehicles considering their synchronized operations at customer sites and multi trips. This paper also evaluates the sustainability of the developed model from both economic and environmental perspectives. Case studies based on small construction sites in the Middle East demonstrate applications of the proposed model to make the most economical plans for delivering bricks. Compared to the single-trip vehicle loader routing problem, the proposed model reduces, on average, 18.7% of the total delivery cost while increasing CO2 emission negligibly. The economic benefit is mainly achieved by reducing the required number of vehicles. Brick plant managers can use the proposed mathematical model to plan the most cost-effective delivery schedules sustainably while minimizing negative environmental effects.

  10. Construction on a new deep ice coring site at Dome Fuji Station -Operations carried out by the JARE-44 Dome Fuji overwintering team-

    Directory of Open Access Journals (Sweden)

    Takao Kameda

    2005-07-01

    Full Text Available Eight members of the 44th Japanese Antarctic Research Expedition (JARE-44 stayed at Dome Fuji Station (77°19′01″S, 39°42′11″E; 3810 m a.s.l.; ice thickness 3028±15 m; mean air temperature -54.4°C; lowest air temperature -79.7°C from January 19, 2003 to January 25, 2004 for glaciological, meteorological, and upper atmospheric observations, and for construction at a new ice coring site for deep ice coring. The construction was a continuation of the activities of JARE-43; JARE-44 primarily carried out interior work at the ice coring site. The following works were carried out during the overwintering period and are described in this paper: retrieval of casing pipes from the borehole, enlargement of the borehole, insertion of casing pipes into the borehole, movement of the winch system from the old to the new ice coring sites (44.5 m apart, floor construction, construction and preparation of a 10 m depth pit for the rotating mast, construction of stairs between the old and the new ice coring sites, construction of working tables, assembling the mast and the small goliath crane, setting up a lifter, testing the winch system, setting the winch for the chip collector, cable replacement for deep ice coring, assembling of a deep ice core drill, adjustment of a rotating mast, enlargement of caves for ice core storage, and general electrical work in the new ice coring site. The total working time for the above operations was 593.5 person-days. Since the average working time was 6 h/day, the total working time was 3561 person-hours. Preparations for borehole temperature measurements in a 2503 m borehole and the ice coring operation that was mainly conducted by the JARE-45 team are briefly described.

  11. Final site environmental statement: Blue Hills Station, Unit Nos. 1 and 2. Related to the determination of the suitability of Site G for eventual construction. Docket Nos. 50-510 and 50-511

    International Nuclear Information System (INIS)

    1978-07-01

    The site suitability analysis is based on the assumption that the Blue Hills Station will employ two pressurized water reactors to produce outputs of approximately 2814 MWt each. Two steam turbine generators will use the heat produced to provide approximately 957 MWe (gross) each. The exhaust steam will be cooled by four low-profile round mechanical-draft cooling towers. Assuming construction of a nuclear station at site G, a summary of environmental impacts and adverse effects is presented

  12. Preparing an ATLAS toroid magnet end-cap for lowering

    CERN Multimedia

    Claudia Marcelloni

    2007-01-01

    One of the two 13-m high toroid magnet end-caps for the ATLAS experiment being transported from the construction hall to the experimental area. The end-cap will be lowered into the ATLAS cavern and attached to an end of the detector.

  13. The ATLAS Distributed Analysis System

    CERN Document Server

    Legger, F; The ATLAS collaboration; Pacheco Pages, A; Stradling, A

    2013-01-01

    In the LHC operations era, analysis of the multi-petabyte ATLAS data sample by globally distributed physicists is a challenging task. To attain the required scale the ATLAS Computing Model was designed around the concept of grid computing, realized in the Worldwide LHC Computing Grid (WLCG), the largest distributed computational resource existing in the sciences. The ATLAS experiment currently stores over 140 PB of data and runs about 140,000 concurrent jobs continuously at WLCG sites. During the first run of the LHC, the ATLAS Distributed Analysis (DA) service has operated stably and scaled as planned. More than 1600 users submitted jobs in 2012, with 2 million or more analysis jobs per week, peaking at about a million jobs per day. The system dynamically distributes popular data to expedite processing and maximally utilize resources. The reliability of the DA service is high but steadily improving; grid sites are continually validated against a set of standard tests, and a dedicated team of expert shifters ...

  14. The ATLAS Distributed Analysis System

    CERN Document Server

    Legger, F; The ATLAS collaboration

    2014-01-01

    In the LHC operations era, analysis of the multi-petabyte ATLAS data sample by globally distributed physicists is a challenging task. To attain the required scale the ATLAS Computing Model was designed around the concept of grid computing, realized in the Worldwide LHC Computing Grid (WLCG), the largest distributed computational resource existing in the sciences. The ATLAS experiment currently stores over 140 PB of data and runs about 140,000 concurrent jobs continuously at WLCG sites. During the first run of the LHC, the ATLAS Distributed Analysis (DA) service has operated stably and scaled as planned. More than 1600 users submitted jobs in 2012, with 2 million or more analysis jobs per week, peaking at about a million jobs per day. The system dynamically distributes popular data to expedite processing and maximally utilize resources. The reliability of the DA service is high but steadily improving; grid sites are continually validated against a set of standard tests, and a dedicated team of expert shifters ...

  15. Preparing a new book on ATLAS

    CERN Multimedia

    Claudia Marcelloni de Oliveira

    A book about the ATLAS project and the ATLAS collaboration is going to be published and available for sale in mid 2008. The book is intended to be a symbol of appreciation for all the people from ATLAS institutes, triggering fond memories through photos, interviews, short commentaries and anecdotes about the daily life and milestones encountered while designing, constructing and completing ATLAS. We would like to give you the opportunity to collaborate with this project in two different ways: Firstly, please send us the best anecdotes related to ATLAS that you remember. To submit anecdotes, send an email to Claudia.Marcelloni@cern.ch. Secondly, you are invited to participate in our PHOTO COMPETITION. Please send the best photos you have of ATLAS attached with a description, the location, and date taken. The categories are: Milestones in the process of designing and building the detector, People at work and Important gatherings. To submit photos you should go to the CDS page and select ATLAS Photo Competi...

  16. Analysis Facility infrastructure (TIER3) for ATLAS High Energy physics experiment

    International Nuclear Information System (INIS)

    Gonzalez de la Hoz, S.; March, L.; Ros, E.; Sanchez, J.; Amoros, G.; Fassi, F.; Fernandez, A.; Kaci, M.; Lamas, A.; Salt, J.

    2007-01-01

    ATLAS project has been asked to define the scope and role of Tier-3 resources (facilities or centres) within the existing ATLAS computing model, activities and facilities. This document attempts to address these questions by describing Tier-3 resources generally, and their relationship to the ATLAS Software and Computing Project. Originally the tiered computing model came out of MONARC (see http://monarc.web.cern.ch/MONARC/) work and was predicated upon the network being a scarce resource. In this model the tiered hierarchy ranged from the Tier-0 (CERN) down to the desktop or workstation (Tier 3). The focus on defining the roles of each tiered component has evolved with the initial emphasis on the Tier-0 (CERN) and Tier-1 (National centres) definition and roles. The various LHC projects, including ATLAS, then evolved the tiered hierarchy to include Tier-2s (Regional centers) as part of their projects. Tier-3s, on the other hand, have (implicitly and sometime explicitly) been defined as whatever an institution could construct to support their Physics goals using institutional and otherwise leveraged resources and therefore have not been considered to be part of the official ATLAS Research Program computing resources nor under their control, meaning there is no formal MOU process to designate sites as Tier-3s and no formal control of the program over the Tier-3 resources. Tier-3s are the responsibility of individual institutions to define, fund, deploy and support. However, having noted this, we must also recognize that Tier-3s must exist and will have implications for how our computing model should support ATLAS physicists. Tier-3 users will want to access data and simulations and will want to enable their Tier-3 resources to support their analysis and simulation work. Tiers 3s are an important resource for physicists to analyze LHC (Large Hadron Collider) data. This document will define how Tier-3s should best interact with the ATLAS computing model, detail the

  17. Characteristics and distribution of trulli constructions in the area of the site of community importance Murgia of Trulli

    Directory of Open Access Journals (Sweden)

    Giuseppe Ruggiero

    2013-10-01

    Full Text Available The agro-forestry territory in the Region of Apulia, southern Italy, is characterised by a widespread and diversified presence of dry stone constructions, including trulli, rural buildings with a characteristic a conical shape. The trulli are mainly to be found in the central and eastern part of the region, called Murgia of Trulli. Trulli are perfectly integrated with the agro-environment specificity of the area, creating a unique landscape and establishing themselves as a testimony of tradition and rural culture. In fact, in this area, from the 17th until the mid-20th century, the trulli accompanied the development of agricultural activities. According to the number of cones they had, they were used as temporary shelters, places of support for primary production, or comfortable houses for the rural population. In recent decades, for several social and economic reasons, this heritage of rural buildings has been affected by abandonment and degradation phenomena. Interventions aimed at recovery and re-use have not always respected the origin of the buildings, their design characteristics or the landscape in which they had been built. In order to reduce the impact that this situation has had on environmental and territorial quality it is, therefore, necessary to develop initiatives to protect and valorise the trulli while respecting the identity of place, the architectural elements, and the agricultural and environmental characteristics of the territory. For this purpose, we need to analyse and characterise the heritage of the existing trulli and its relationship with the local reality. The present paper analyses the typology and distribution of the trulli located on the site of community importance Murgia of Trulli, a protected area with high environmental value in the central-eastern area of the Region of Apulia. Specifically, we analysed the relationship between the trulli buildings and the agro-environment context to acquire a basic

  18. Environmental Assessment for Leasing Land for the Siting, Construction and Operation of a Commercial AM Radio Antenna at Los Alamos National Laboratory, Los Alamos, NM

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2000-02-16

    The United States (U.S.) Department of Energy (DOE) proposes to lease approximately 3 acres of land at the Los Alamos National Laboratory (LANL) on the southeast tip of Technical Area (TA) 54 for the siting, construction and operation of an AM radio broadcasting antenna. This Environmental Assessment (EA) has been developed in order to assess the environmental effects of the Proposed Action and No Action alternative. The Proposed Action includes the lease of land for the siting, construction and operation of an AM radio broadcasting antenna in TA-54, just north of Pajarito Road and State Highway 4. The No Action Alternative was also considered. Under the No Action Alternative, DOE would not lease land on LANL property for the siting and operation of an AM radio broadcasting antenna; the DOE would not have a local station for emergency response use; and the land would continue to be covered in native vegetation and serve as a health and safety buffer zone for TA-54 waste management activities. Other potential sites on LANL property were evaluated but dismissed for reasons such as interference with sensitive laboratory experiments. Potential visual, health, and environmental effects are anticipated to be minimal for the Proposed Action. The radio broadcasting antenna would be visible against the skyline from some public areas, but would be consistent with other man-made objects in the vicinity that partially obstruct viewsheds (e.g. meteorological tower, power lines). Therefore, the net result would be a modest change of the existing view. Electromagnetic field (EMF) emissions from the antenna would be orders or magnitude less than permissible limits. The proposed antenna construction would not affect known cultural sites, but is located in close proximity to two archaeological sites. Construction would be monitored to ensure that the associated road and utility corridor would avoid cultural sites.

  19. ATLAS Distributed Analysis Tools

    CERN Document Server

    Gonzalez de la Hoz, Santiago; Liko, Dietrich

    2008-01-01

    The ATLAS production system has been successfully used to run production of simulation data at an unprecedented scale. Up to 10000 jobs were processed in one day. The experiences obtained operating the system on several grid flavours was essential to perform a user analysis using grid resources. First tests of the distributed analysis system were then performed. In the preparation phase data was registered in the LHC File Catalog (LFC) and replicated in external sites. For the main test, few resources were used. All these tests are only a first step towards the validation of the computing model. The ATLAS management computing board decided to integrate the collaboration efforts in distributed analysis in only one project, GANGA. The goal is to test the reconstruction and analysis software in a large scale Data production using Grid flavors in several sites. GANGA allows trivial switching between running test jobs on a local batch system and running large-scale analyses on the Grid; it provides job splitting a...

  20. Instrumentation and measurement method for the ATLAS test facility

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Byong Jo; Chu, In Chul; Eu, Dong Jin; Kang, Kyong Ho; Kim, Yeon Sik; Song, Chul Hwa; Baek, Won Pil

    2007-03-15

    An integral effect test loop for pressurized water reactors (PWRs), the ATLAS is constructed by thermal-hydraulic safety research division in KAERI. The ATLAS facility has been designed to have the length scale of 1/2 and area scale of 1/144 compared with the reference plant, APR1400 which is a Korean evolution type nuclear reactors. A total 1300 instrumentations is equipped in the ATLAS test facility. In this report, the instrumentation of ATLAS test facility and related measurement methods were introduced.

  1. Lexicogrammar in the International Construction Industry: A Corpus-Based Case Study of Japanese-Hong-Kongese On-Site Interactions in English

    Science.gov (United States)

    Handford, Michael; Matous, Petr

    2011-01-01

    The purpose of this research is to identify and interpret statistically significant lexicogrammatical items that are used in on-site spoken communication in the international construction industry, initially through comparisons with reference corpora of everyday spoken and business language. Several data sources, including audio and video…

  2. Status of the ATLAS experiment at CERN

    International Nuclear Information System (INIS)

    Taylor, G.

    2000-01-01

    Full text: The ATLAS experiment, to operate at CERN's Large Hadron Collider (LHC), from 2005 is currently under construction. The Australian HEP Consortium is participating in the development and construction of the semi-conductor tracker (SCT) sub-system of ATLAS. Australian scientists play significant roles in many aspects of the SCT detector module development, including design, prototyping, measurement, beam tests and simulation. Production facilities for construction of two hundred high precision detector modules for the SCT Forward region are well advanced in Melbourne and Sydney laboratories. This talk will give an overview of ATLAS experiment goals and status. It will concentrate on the Australian contribution. The talk will conclude with an outline of the future schedule and plans

  3. Analysis list - ChIP-Atlas | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...://ftp.biosciencedbc.jp/archive/chip-atlas/LATEST/chip_atlas_analysis_list.zip File size: 44.8 KB Simple sea...e class. About This Database Database Description Download License Update History of This Database Site Policy | Contact Us Analysis list - ChIP-Atlas | LSDB Archive ...

  4. Wind Atlas for South Africa (WASA) – Best practice guide for application of WASA

    DEFF Research Database (Denmark)

    Hansen, Jens Carsten; Mortensen, Niels Gylling; Cronin, Tom

    The present report is a best practice guide for application of results from the Wind Atlas for South Africa (WASA). A general description of the methodological framework – the wind atlas methodology – is given, including validation results of the numerical wind atlas at 10 measurement sites...

  5. Photos of the massive ATLAS art mural at point 01 at CERN by Josef Kristofoletti, completed.

    CERN Multimedia

    Claudia Marcelloni

    2010-01-01

    Photos of the massive mural of the ATLAS detector at CERN Point 1 painted by artist Josef Kristofoletti. The mural is located at the ATLAS Experiment site, and it shows on two walls the detector with a collision event superimposed. The event on the large wall shows a depiction of how a Higgs boson may look like in ATLAS.

  6. Increasing Drought Sensitivity and Decline of Atlas Cedar (Cedrus atlantica in the Moroccan Middle Atlas Forests

    Directory of Open Access Journals (Sweden)

    Jesús Julio Camarero

    2011-09-01

    Full Text Available An understanding of the interactions between climate change and forest structure on tree growth are needed for decision making in forest conservation and management. In this paper, we investigated the relative contribution of tree features and stand structure on Atlas cedar (Cedrus atlantica radial growth in forests that have experienced heavy grazing and logging in the past. Dendrochronological methods were applied to quantify patterns in basal-area increment and drought sensitivity of Atlas cedar in the Middle Atlas, northern Morocco. We estimated the tree-to-tree competition intensity and quantified the structure in Atlas cedar stands with contrasting tree density, age, and decline symptoms. The relative contribution of tree age and size and stand structure to Atlas cedar growth decline was estimated by variance partitioning using partial-redundancy analyses. Recurrent drought events and temperature increases have been identified from local climate records since the 1970s. We detected consistent growth declines and increased drought sensitivity in Atlas cedar across all sites since the early 1980s. Specifically, we determined that previous growth rates and tree age were the strongest tree features, while Quercus rotundifolia basal area was the strongest stand structure measure related to Atlas cedar decline. As a result, we suggest that Atlas cedar forests that have experienced severe drought in combination with grazing and logging may be in the process of shifting dominance toward more drought-tolerant species such as Q. rotundifolia.

  7. European Wind Atlas and Wind Resource Research in Denmark

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling

    to estimate the actual wind climate at any specific site and height within this region. The Danish and European Wind Atlases are examples of how the wind atlas methodology can be employed to estimate the wind resource potential for a country or a sub-continent. Recently, the methodology has also been used...... - from wind measurements at prospective sites to wind tunnel simulations and advanced flow modelling. Among these approaches, the wind atlas methodology - developed at Ris0 National Laboratory over the last 25 years - has gained widespread recognition and is presently considered by many as the industry......-standard tool for wind resource assessment and siting of wind turbines. The PC-implementation of the methodology, the Wind Atlas Analysis and Application Program (WAsP), has been applied in more than 70 countries and territories world-wide. The wind atlas methodology is based on physical descriptions and models...

  8. ATLAS: Now under new management

    CERN Multimedia

    Katarina Anthony

    2013-01-01

    On 1 March, the ATLAS Collaboration welcomed a new spokesperson, Dave Charlton (University of Birmingham), and two new deputy spokespersons, Thorsten Wengler (CERN) and Beate Heinemann (University of California, Berkeley and LBNL). The Bulletin takes a look at what’s in store for one of the world’s largest scientific collaborations.   ATLAS members at the 2010 collaboration meeting in Copenhagen. Image: Rune Johansen and Troels Petersen. ATLAS spokesperson Dave Charlton has seen the collaboration through countless milestones: from construction to start-up to the 4 July 2012 announcement, he’s been an integral part of the team. Now, after twelve years with the collaboration, Dave is moving into the main office for the next two years. “2012 was a landmark year for ATLAS,” says Dave. “We spent a lot of time in the limelight and, in many ways, all eyes are still on us. But with the shutdown now under way, our focus is ...

  9. A Lego version of ATLAS

    CERN Multimedia

    Laëtitia Pedroso

    2010-01-01

    There's nothing very unusual about a small child making simple objects out of Lego. But wouldn't you be surprised to learn that one six-year old has just made a life-like model of the ATLAS detector?   Bastian with his Lego ATLAS detector. © Photo provided by Kai Nicklas, Bastian's father. It all began a month ago when the boy's father was watching a video about the construction of the ATLAS detector on the Internet. He hadn't noticed that his son was watching it over his shoulder. The small boy was fascinated by what he was seeing on the computer screen and his first reaction was to exclaim: "Wow! That's a terrific machine! I think the people who built it must be really clever." The detector must have really fired his imagination because, after asking his father a few questions, he decided to make a Lego model of it. Look at the photo and you will see how closely the model he produced resembles the actual ATLAS detector. Is the little boy in question, Bastia...

  10. Spanish ATLAS Tier-2: facing up to LHC Run 2

    CERN Document Server

    Gonzalez de la Hoz, Santiago; Fassi, Farida; Fernandez Casani, Alvaro; Kaci, Mohammed; Lacort Pellicer, Victor Ruben; Montiel Gonzalez, Almudena Del Rocio; Oliver Garcia, Elena; Pacheco Pages, Andres; Sánchez, Javier; Sanchez Martinez, Victoria; Salt, José; Villaplana Perez, Miguel

    2015-01-01

    The goal of this work is to describe the way of addressing the main challenges of Run-2 by the Spanish ATLAS Tier-2. The considerable increase of energy and luminosity for the upcoming Run-2 with respect to Run-1 has led to a revision of the ATLAS computing model as well as some of the main ATLAS computing tools. The adaptation on these changes will be shown, with the peculiarities that it is a distributed Tier-2 composed of three sites and its members are involved on ATLAS computing tasks with a hub of research, innovation and education.

  11. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  12. Protein - AT Atlas | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ..._protein.zip File URL: ftp://ftp.biosciencedbc.jp/archive/at_atlas/LATEST/at_atla...About This Database Database Description Download License Update History of This Database Site Policy | Contact Us Protein - AT Atlas | LSDB Archive ...

  13. PREIMS - AT Atlas | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available switchLanguage; BLAST Search Image Search Home About Archive Update History Data ...Targeted Proteins Research Program (TPRP). Data file File name: at_atlas_preims.zip File URL: ftp://ftp.biosciencedbc.jp/archiv...base Database Description Download License Update History of This Database Site Policy | Contact Us PREIMS - AT Atlas | LSDB Archive ...

  14. ATLAS rewards two Japanese suppliers of major detector components.

    CERN Multimedia

    Patrice Loïez

    2002-01-01

    The ATLAS supplier award in recognition of excellence has just been attributed to Kawasaki Heavy Industries, who produced the liquid-argon barrel cryostat. Kawasaki received its award in Hall 189 on the Meyrin site, where the cryostat is currently located. Toshiba Corporation's award for the superconducting central solenoid was presented two months ago at the Toshiba headquarters in Japan. Photo 01: P. Pailler, project leader for the ATLAS liquid-argon cryostats, addressing the Kawasaki delegation. Photo 04: H. Oberlack, project leader for the ATLAS liquid-argon system, addressing the Kawasaki delegation. Photo 11: P. Jenni (left), ATLAS Collaboration spokesperson, presenting the ATLAS supplier award for the barrel cryostat for the liquid-argon calorimeter to Mr. S. Nose, General Manager of Kawasaki Heavy Industries Ltd. Photo 18: J. Sondericker (left), liquid-argon barrel cryostat project engineer (BNL), presenting Mr. Nose (Kawasaki) an award from Brookhaven for the barrel cryostat for the ATLAS liquid-argo...

  15. Trigger Menu-aware Monitoring for the ATLAS experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00441925; The ATLAS collaboration

    2017-01-01

    Changes in the trigger menu, the online algorithmic event-selection of the ATLAS experiment at the LHC, are followed by adjustments to the ATLAS trigger monitoring systems. During Run 1, and so far in Run 2, ATLAS has deployed monitoring updates with the installation of new software releases at Tier-0, the first level of the ATLAS computing grid. Having to wait for a new software release to be installed at Tier-0, in order to update ATLAS offline trigger monitoring configurations, results in a lag with respect to the modification of the trigger menu. We present the design and implementation of a `trigger menu-aware' monitoring system that aims to simplify the ATLAS operational workflows by allowing monitoring configuration changes to be made at the Tier-0 site by utilising an Oracle SQL database.

  16. Consequences of least tern (Sternula antillarum) microhabitat nest-site selection on natural and mechanically constructed sandbars in the Missouri River

    Science.gov (United States)

    Stucker, Jennifer H.; Buhl, Deborah A.; Sherfy, Mark H.

    2013-01-01

    Nest-habitat selection in colonial species has rarely been assessed at multiple spatial scales to evaluate its fitness consequences. Management for the federally endangered U.S. Interior population of Least Terns (Sternula antillarum) has focused on maintenance of breeding habitats, including mechanical construction of sandbars from dredged material. Least Terns are attracted to large areas of unvegetated substrate, yet small-scale habitat features are thought to trigger selection for nesting. We evaluated nest-scale habitat selection to determine (1) whether selection differs between constructed and natural sandbars and (2) the subsequent consequences of habitat selection on nest success. During 2006–2008, we examined 869 Least Tern nest sites on constructed and natural sandbars in the Missouri River for evidence of microhabitat selection at the nest in relation to habitat within the surrounding 3-m area. Least Tern nest sites had coarser and larger substrate materials at the nest, more debris, and less vegetation than the surrounding area. Nests in constructed habitats had a greater percentage of coarse substrates and less vegetation or debris than nests in naturally created habitats. Apparent nest success was 1.8× greater on constructed than on natural sandbars. Nest success was best predicted by models with two spatial scales of predictors, including substrates (nest) and vegetation and debris (nest or surrounding area). Our results indicate that Least Terns select nest microhabitat characteristics that are associated with wind- and water-scoured habitats, and that nest success increases when these habitats are selected.

  17. The consistency service of the ATLAS Distributed Data Management system

    CERN Document Server

    Serfon, C; The ATLAS collaboration

    2011-01-01

    With the continuously increasing volume of data produced by ATLAS and stored on the WLCG sites, the probability of data corruption or data losses, due to software and hardware failures is increasing. In order to ensure the consistency of all data produced by ATLAS a Consistency Service has been developed as part of the DQ2 Distributed Data Management system. This service is fed by the different ATLAS tools, i.e. the analysis tools, production tools, DQ2 site services or by site administrators that report corrupted or lost files. It automatically corrects the errors reported and informs the users in case of irrecoverable file loss.

  18. The Consistency Service of the ATLAS Distributed Data Management system

    CERN Document Server

    Serfon, C; The ATLAS collaboration

    2010-01-01

    With the continuously increasing volume of data produced by ATLAS and stored on the WLCG sites, the probability of data corruption or data losses, due to software and hardware failure is increasing. In order to ensure the consistency of all data produced by ATLAS a Consistency Service has been developed as part of the DQ2 Distributed Data Management system. This service is fed by the different ATLAS tools, i.e. the analysis tools, production tools, DQ2 site services or by site administrators that report corrupted or lost files. It automatically correct the errors reported and informs the users in case of irrecoverable file loss.

  19. EnviroAtlas

    Data.gov (United States)

    City and County of Durham, North Carolina — This EnviroAtlas web service supports research and online mapping activities related to EnviroAtlas (https://www.epa.gov/enviroatlas). The layers in this web...

  20. Development of a test facility to evaluate the optimal design of BMPs for managing environmental problems at construction sites.

    Science.gov (United States)

    2012-06-01

    The following document is the final report for ALDOT Project 930655 which summarizes the design and : construction of the Auburn University Erosion and Sediment Control Testing Facility (AUESCTF) along : with several intermediatescale, f...

  1. Creation of an atlas of filter positions for fluence field modulated CT

    Energy Technology Data Exchange (ETDEWEB)

    Szczykutowicz, Timothy P., E-mail: TSzczykutowicz@uwhealth.org [Departments of Radiology and Medical Physics, University of Wisconsin-Madison, 1111 Highland Avenue, Madison, Wisconsin 53705 (United States); Hermus, James [Department of Biomedical Engineering, University of Wisconsin-Madison, 1550 Engineering Drive, Madison, Wisconsin 53706 (United States)

    2015-04-15

    Purpose: Fluence field modulated CT (FFMCT) and volume of interest (VOI) CT imaging applications require adjustment of the profile of the x-ray fluence incident on a patient as a function of view angle. Since current FFMCT prototypes can theoretically take on an infinite number of configurations, measuring a calibration data set for all possible positions would not be feasible. The present work details a methodology for calculating an atlas of configurations that will span all likely body regions, patient sizes, patient positioning, and imaging modes. The hypothesis is that there exists a finite number of unique modulator configurations that effectively span the infinite number of possible fluence profiles with minimal loss in performance. Methods: CT images of a head, shoulder, thorax, abdominal, wrist, and leg anatomical slices were dilated and contracted to model small, medium, and large sized patients. Additionally, the images were positioned from iso-center by three different amounts. The modulator configurations required to compensate for each image were computed assuming a FFMCT prototype, digital beam attenuator, (DBA), was set to equalize the detector exposure. Each atlas configuration should be different from the other atlas configurations. The degree of difference was quantified using the sum of the absolute differences in filter thickness between configurations. Using this metric, a set of unique wedge configurations for which no two configurations have a metric value smaller than some threshold can be constructed. Differences in the total number of incident photons between the unconstrained filters and the atlas were studied as a function of the number of atlas positions for each anatomical site and size/off-centering combination. Results: By varying the threshold used in creating the atlas, it was found that roughly 322 atlas positions provided an incident number of photons within 20% of using 19 440 unique filters (the number of atlas entries

  2. Creation of an atlas of filter positions for fluence field modulated CT

    International Nuclear Information System (INIS)

    Szczykutowicz, Timothy P.; Hermus, James

    2015-01-01

    Purpose: Fluence field modulated CT (FFMCT) and volume of interest (VOI) CT imaging applications require adjustment of the profile of the x-ray fluence incident on a patient as a function of view angle. Since current FFMCT prototypes can theoretically take on an infinite number of configurations, measuring a calibration data set for all possible positions would not be feasible. The present work details a methodology for calculating an atlas of configurations that will span all likely body regions, patient sizes, patient positioning, and imaging modes. The hypothesis is that there exists a finite number of unique modulator configurations that effectively span the infinite number of possible fluence profiles with minimal loss in performance. Methods: CT images of a head, shoulder, thorax, abdominal, wrist, and leg anatomical slices were dilated and contracted to model small, medium, and large sized patients. Additionally, the images were positioned from iso-center by three different amounts. The modulator configurations required to compensate for each image were computed assuming a FFMCT prototype, digital beam attenuator, (DBA), was set to equalize the detector exposure. Each atlas configuration should be different from the other atlas configurations. The degree of difference was quantified using the sum of the absolute differences in filter thickness between configurations. Using this metric, a set of unique wedge configurations for which no two configurations have a metric value smaller than some threshold can be constructed. Differences in the total number of incident photons between the unconstrained filters and the atlas were studied as a function of the number of atlas positions for each anatomical site and size/off-centering combination. Results: By varying the threshold used in creating the atlas, it was found that roughly 322 atlas positions provided an incident number of photons within 20% of using 19 440 unique filters (the number of atlas entries

  3. Dedication of the massive ATLAS art mural painted by Josef Kristofoletti directly above the cavern of the ATLAS Experiment at CERN

    CERN Multimedia

    Claudia Marcelloni, Michael Barnett

    2010-01-01

    Ceremony to celebrate the massive mural of the ATLAS detector at CERN painted by artist Josef Kristofoletti. The mural is located at the ATLAS Experiment site, and it shows on two perpendicular walls the detector with a collision event superimposed. The event on the large wall shows a simulation of an event that would be recorded in ATLAS if a Higgs boson was produced. The cavern of the ATLAS Experiment with the detector is 100 meters directly below the mural. The height of the mural is about 12 meters (40 feet). The actual ATLAS detector is more than twice as big.

  4. Berliner Philarmoniker ATLAS visit

    CERN Multimedia

    ATLAS Collaboration

    2017-01-01

    The Berliner Philarmoniker in on tour through Europe. They stopped on June 27th in Geneva, for a concert at the Victoria Hall. An ATLAS visit was organised the morning after, lead by the ATLAS spokesperson Karl Jakobs (welcome and overview talk) and two ATLAS guides (AVC visit and 3D movie).

  5. Dedicated Caravan Sites for French Gens du Voyage: Public Health Policy or Construction of Health and Environmental Inequalities?

    Science.gov (United States)

    Foisneau, Lise

    2017-12-01

    In France, gens du voyage ("people who travel" or "travellers") is a term used by the government to categorize various itinerant populations, the majority of which are diverse Romani groups. People categorized as gens du voyage are legally required to reside in particular locations called "dedicated caravan sites." Parliamentary debates about these dedicated caravan sites have clarified that one of the objectives of such sites is to help fulfill the gens du voyage 's right to health. However, there is a significant gap between the officially stated goals of such sites and the reality of life within them. This paper draws on research finding that the conditions in most dedicated caravan sites do not conform with the rights of gens du voyage to acceptable sanitary conditions and other underlying determinants of health.

  6. A new sub-detector for ATLAS

    CERN Multimedia

    Marco Bruschi

    Since last August, the ATLAS detector family has been joined by a new little member named LUCID, from the acronym "LUminosity Cerenkov Integrating Detector". This may well surprise you if you are already aware that LUCID construction started only in February after its approval by an ATLAS-management mandated review committee. The rapid progress from approval to installation is the result of the close collaboration between groups from Alberta (Canada), INFN Bologna (Italy), Lund (Sweden) and CERN. LUCID is primarily intended to measure the luminosity delivered by the LHC to ATLAS with a systematic uncertainty in the range of a few percent. To achieve such a precision and still meet the demanding installation schedule, the LUCID developers prized simplicity and robustness above all. One of the LUCID vessels while under construction. One can see the aluminum Cerenkov tubes and the photomultiplier mount (plugged into the upper flange). The two fully assembled LUCID vessels seen from the front end elect...

  7. ATLAS Facility and Instrumentation Description Report

    International Nuclear Information System (INIS)

    Kang, Kyoung Ho; Moon, Sang Ki; Park, Hyun Sik

    2009-06-01

    A thermal-hydraulic integral effect test facility, ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation), has been constructed at KAERI (Korea Atomic Energy Research Institute). The ATLAS is a half-height and 1/288-volume scaled test facility with respect to the APR1400. The fluid system of the ATLAS consists of a primary system, a secondary system, a safety injection system, a break simulating system, a containment simulating system, and auxiliary systems. The primary system includes a reactor vessel, two hot legs, four cold legs, a pressurizer, four reactor coolant pumps, and two steam generators. The secondary system of the ATLAS is simplified to be of a circulating looptype. Most of the safety injection features of the APR1400 and the OPR1000 are incorporated into the safety injection system of the ATLAS. In the ATLAS test facility, about 1300 instrumentations are installed to precisely investigate the thermal-hydraulic behavior in simulation of the various test scenarios. This report describes the scaling methodology, the geometric data of the individual component, and the specification and the location of the instrumentations which are specific to the simulation of 50% DVI line break accident of the APR1400 for supporting the 50 th OECD/NEA International Standard Problem Exercise (ISP-50)

  8. A construction of Japanese consensus-formation model for the selection of last disposal site of high-level radioactive wastes

    International Nuclear Information System (INIS)

    Oki, Naotaka; Saigusa, Shin; Yonehara, Hidenori

    2010-01-01

    A group with Shizuoka University as the center one is promoting the investigation of the subject 'A construction of Japanese consensus - formation model for the selection of last disposal site of high-level radioactive wastes' adopted in 'Atomic Energy Fundamental Strategic Initiative' at the 20th fiscal year of Heisei, the Ministry of Education, Culture, Sports, Science and Technology. The result of this investigation is described here. (M.H.)

  9. Assessment of radiation impact on the environment components while preparing for construction site of centralized storage facility for spent nuclear fuel (CSSNF)

    International Nuclear Information System (INIS)

    Pavlovs'kij, L.Yi.; Gorodets'kij, D.V.; Syizov, A.O.; Kholodyuk, A.O.

    2016-01-01

    Predictive assessment of radiation impacts on the air environment, soil cover, staff, which is located in a residential area, staff of an adjacent to the CSSNF enterprises as a result of work to prepare the site for construction of CSSNF at the Chornobyl Exclusion Zone is presented. It is shown that radiation effects on components of the environment will not result in exceeding the reference levels of radiation safety

  10. Face, content, and construct validity of four, inanimate training exercises using the da Vinci ® Si surgical system configured with Single-Site ™ instrumentation.

    Science.gov (United States)

    Jarc, Anthony M; Curet, Myriam

    2015-08-01

    Validated training exercises are essential tools for surgeons as they develop technical skills to use robot-assisted minimally invasive surgical systems. The purpose of this study was to show face, content, and construct validity of four, inanimate training exercises using the da Vinci (®) Si surgical system configured with Single-Site (™) instrumentation. New (N = 21) and experienced (N = 6) surgeons participated in the study. New surgeons (11 Gynecology [GYN] and 10 General Surgery [GEN]) had not completed any da Vinci Single-Site cases but may have completed multiport cases using the da Vinci system. They participated in this study prior to attending a certification course focused on da Vinci Single-Site instrumentation. Experienced surgeons (5 GYN and 1 GEN) had completed at least 25 da Vinci Single-Site cases. The surgeons completed four inanimate training exercises and then rated them with a questionnaire. Raw metrics and overall normalized scores were computed using both video recordings and kinematic data collected from the surgical system. The experienced surgeons significantly outperformed new surgeons for many raw metrics and the overall normalized scores derived from video review (p da Vinci Single-Site surgery and actually testing the technical skills used during da Vinci Single-Site surgery. In summary, the four training exercises showed face, content, and construct validity. Improved overall scores could be developed using additional metrics not included in this study. The results suggest that the training exercises could be used in an overall training curriculum aimed at developing proficiency in technical skills for surgeons new to da Vinci Single-Site instrumentation.

  11. The ATLAS Detector Control System

    International Nuclear Information System (INIS)

    Lantzsch, K; Braun, H; Hirschbuehl, D; Kersten, S; Arfaoui, S; Franz, S; Gutzwiller, O; Schlenker, S; Tsarouchas, C A; Mindur, B; Hartert, J; Zimmermann, S; Talyshev, A; Oliveira Damazio, D; Poblaguev, A; Martin, T; Thompson, P D; Caforio, D; Sbarra, C; Hoffmann, D

    2012-01-01

    The ATLAS experiment is one of the multi-purpose experiments at the Large Hadron Collider (LHC) at CERN, constructed to study elementary particle interactions in collisions of high-energy proton beams. Twelve different sub detectors as well as the common experimental infrastructure are controlled and monitored by the Detector Control System (DCS) using a highly distributed system of 140 server machines running the industrial SCADA product PVSS. Higher level control system layers allow for automatic control procedures, efficient error recognition and handling, manage the communication with external systems such as the LHC controls, and provide a synchronization mechanism with the ATLAS data acquisition system. Different databases are used to store the online parameters of the experiment, replicate a subset used for physics reconstruction, and store the configuration parameters of the systems. This contribution describes the computing architecture and software tools to handle this complex and highly interconnected control system.

  12. The ATLAS Detector Control System

    Science.gov (United States)

    Lantzsch, K.; Arfaoui, S.; Franz, S.; Gutzwiller, O.; Schlenker, S.; Tsarouchas, C. A.; Mindur, B.; Hartert, J.; Zimmermann, S.; Talyshev, A.; Oliveira Damazio, D.; Poblaguev, A.; Braun, H.; Hirschbuehl, D.; Kersten, S.; Martin, T.; Thompson, P. D.; Caforio, D.; Sbarra, C.; Hoffmann, D.; Nemecek, S.; Robichaud-Veronneau, A.; Wynne, B.; Banas, E.; Hajduk, Z.; Olszowska, J.; Stanecka, E.; Bindi, M.; Polini, A.; Deliyergiyev, M.; Mandic, I.; Ertel, E.; Marques Vinagre, F.; Ribeiro, G.; Santos, H. F.; Barillari, T.; Habring, J.; Huber, J.; Arabidze, G.; Boterenbrood, H.; Hart, R.; Iakovidis, G.; Karakostas, K.; Leontsinis, S.; Mountricha, E.; Ntekas, K.; Filimonov, V.; Khomutnikov, V.; Kovalenko, S.; Grassi, V.; Mitrevski, J.; Phillips, P.; Chekulaev, S.; D'Auria, S.; Nagai, K.; Tartarelli, G. F.; Aielli, G.; Marchese, F.; Lafarguette, P.; Brenner, R.

    2012-12-01

    The ATLAS experiment is one of the multi-purpose experiments at the Large Hadron Collider (LHC) at CERN, constructed to study elementary particle interactions in collisions of high-energy proton beams. Twelve different sub detectors as well as the common experimental infrastructure are controlled and monitored by the Detector Control System (DCS) using a highly distributed system of 140 server machines running the industrial SCADA product PVSS. Higher level control system layers allow for automatic control procedures, efficient error recognition and handling, manage the communication with external systems such as the LHC controls, and provide a synchronization mechanism with the ATLAS data acquisition system. Different databases are used to store the online parameters of the experiment, replicate a subset used for physics reconstruction, and store the configuration parameters of the systems. This contribution describes the computing architecture and software tools to handle this complex and highly interconnected control system.

  13. Exploiting Virtualization and Cloud Computing in ATLAS

    International Nuclear Information System (INIS)

    Harald Barreiro Megino, Fernando; Van der Ster, Daniel; Benjamin, Doug; De, Kaushik; Gable, Ian; Paterson, Michael; Taylor, Ryan; Hendrix, Val; Vitillo, Roberto A; Panitkin, Sergey; De Silva, Asoka; Walker, Rod

    2012-01-01

    The ATLAS Computing Model was designed around the concept of grid computing; since the start of data-taking, this model has proven very successful in the federated operation of more than one hundred Worldwide LHC Computing Grid (WLCG) sites for offline data distribution, storage, processing and analysis. However, new paradigms in computing, namely virtualization and cloud computing, present improved strategies for managing and provisioning IT resources that could allow ATLAS to more flexibly adapt and scale its storage and processing workloads on varied underlying resources. In particular, ATLAS is developing a “grid-of-clouds” infrastructure in order to utilize WLCG sites that make resources available via a cloud API. This work will present the current status of the Virtualization and Cloud Computing R and D project in ATLAS Distributed Computing. First, strategies for deploying PanDA queues on cloud sites will be discussed, including the introduction of a “cloud factory” for managing cloud VM instances. Next, performance results when running on virtualized/cloud resources at CERN LxCloud, StratusLab, and elsewhere will be presented. Finally, we will present the ATLAS strategies for exploiting cloud-based storage, including remote XROOTD access to input data, management of EC2-based files, and the deployment of cloud-resident LCG storage elements.

  14. Environmental assessment for the resiting, construction, and operation of the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This environmental assessment (EA) presents estimated environmental impacts from the resiting, construction, and operation of the US Department of Energy`s (DOE`s) Environmental and Molecular Sciences Laboratory (EMSL), which is proposed to be constructed and operated on land near the south boundary of the Hanford Site near Richland, Washington. The EMSL, if constructed, would be a modern research facility in which experimental, theoretical, and computational techniques can be focused on environmental restoration problems, such as the chemical and transport behavior of complex mixtures of contaminants in the environment. The EMSL design includes approximately 18,500 square meters (200,000 square feet) of floor space on a 12-hectare (30-acre) site. The proposed new site is located within the city limits of Richland in north Richland, at the south end of DOE`s 300 Area, on land to be deeded to the US by the Battelle Memorial Institute. Approximately 200 persons are expected to be employed in the EMSL and approximately 60 visiting scientists may be working in the EMSL at any given time. State-of-the-art equipment is expected to be installed and used in the EMSL. Small amounts of hazardous substances (chemicals and radionuclides) are expected to be used in experimental work in the EMSL.

  15. Rethinking the Business Model in Construction by the Use of Off-Site System Deliverance: Case of the Shaft Project

    OpenAIRE

    Thuesen, Christian; Hvam, Lars

    2013-01-01

    This paper presents a set of insights to be used in the development of business models for off-site system deliveries contributing to the development of Off-Site Manufacturing practices (OSM). The theoretical offset for discussing the development of business models is the blue ocean strategy literature combined with theories on mass-customization and platform development identifying the optimization of cost and value through the handling of complexity as the central process. This framework is...

  16. Report to users of ATLAS

    International Nuclear Information System (INIS)

    Ahmad, I.; Glagola, B.

    1995-05-01

    This report contains discussing in the following areas: Status of the Atlas accelerator; highlights of recent research at Atlas; concept for an advanced exotic beam facility based on Atlas; program advisory committee; Atlas executive committee; and Atlas and ANL physics division on the world wide web

  17. Recent ATLAS Articles on WLAP

    CERN Multimedia

    J. Herr

    As reported in the September 2004 ATLAS eNews, the Web Lecture Archive Project is a system for the archiving and publishing of multimedia presentations, using the Web as medium. We list here newly available WLAP items relating to ATLAS: Atlas Physics Workshop 6-11 June 2005 June 2005 ATLAS Week Plenary Session Click here to browse WLAP for all ATLAS lectures.

  18. Criteria and results from the analysis of the problem of site selection for the construction of high level RAW repository

    International Nuclear Information System (INIS)

    Evstatiev, D.; Kozhoukharova, D.; Iliev, I.; Karagyuleva, J.

    1993-02-01

    The criteria for preliminary assessment of the Bulgarian territory and the results of the selection of prospective sites for future investigation concerning the choice of the suitable places for RAW repositories are presented. The selection of the prospective terrains has been performed in two stages: 1) Categorization of the country according to the prospective conditions for suitable sites and 2) Distinguishing and preliminary assessment of the suitable sites. The number of these sites was reduced to 20 by the method of successive screening. They are located in Northwest and Southeast Bulgaria and are built of marls, clays, granite, gneiss, serpentine and and volcanic rocks. The selected 20 sites has been subjected to preliminary investigation according to a programme specially worked out for the purpose. The investigation covers the analysis and summing up of the available geographical, geomorphological, geological, seismotectonic, hydrological, climatic, hydrogeological and geotechnical data, as well as a minimum of additional field research and laboratory tests. The results of the investigation of each site are presented and discussed. 1 ref

  19. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA): Revised Addition

    Science.gov (United States)

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  20. Material science experiments on the Atlas Facility

    International Nuclear Information System (INIS)

    Keinigs, Rhonald K.; Atchison, Walter L.; Faehl, Rickey J.; Lindemuth, Irvin R.; Anderson, Wallace E.; Bartsch, Robert Richard; Flower-Maudlin, Elane C.; Hammerberg, James E.; Holtkamp, David B.; Jones, Michael E.; Kyrala, George A.; Oro, David M.; Parker, Jerald V.; Preston, Dean L.; Reinovsky, Robert E.; Scudder, David W.; Sheehey, Peter T.; Shlacter, Jack S.; Stokes, John L.; Taylor, Antoinette J.; Tonks, Davis L.; Turchi, Peter J.

    2001-01-01

    Three material properties experiments that are to be performed on the Atlas pulsed power facility are described; friction at sliding metal interfaces, spallation and damage in convergent geomety, and plastic flow at high strain and high strain rate. Construction of this facility has been completed and experiments in high energy density hydrodynamics and material dynamics will begin in 2001.

  1. Constructing Narrative Ecologies as a Site for Teachers' Professional Learning with New Technologies and Media in Primary Education

    Science.gov (United States)

    Turvey, Keith

    2012-01-01

    This article argues that to understand how new technologies and media can become co-agents in the process of pedagogical change, we first need to understand teachers' complex relationship with new technologies and media in both their personal and their professional lives. A conceptual framework is delineated for constructing a complex narrative…

  2. The Next Generation ARC Middleware and ATLAS Computing Model

    CERN Document Server

    Filipcic, A; The ATLAS collaboration; Smirnova, O; Konstantinov, A; Karpenko, D

    2012-01-01

    The distributed NDGF Tier-1 and associated Nordugrid clusters are well integrated into the ATLAS computing model but follow a slightly different paradigm than other ATLAS resources. The current strategy does not divide the sites as in the commonly used hierarchical model, but rather treats them as a single storage endpoint and a pool of distributed computing nodes. The next generation ARC middleware with its several new technologies provides new possibilities in development of the ATLAS computing model, such as pilot jobs with pre-cached input files, automatic job migration between the sites, integration of remote sites without connected storage elements, and automatic brokering for jobs with non-standard resource requirements. ARC's data transfer model provides an automatic way for the computing sites to participate in ATLAS' global task management system without requiring centralised brokering or data transfer services. The powerful API combined with Python and Java bindings can easily be used to build new ...

  3. Development and Implementation of a Corriedale Ovine Brain Atlas for Use in Atlas-Based Segmentation.

    Directory of Open Access Journals (Sweden)

    Kishan Andre Liyanage

    Full Text Available Segmentation is the process of partitioning an image into subdivisions and can be applied to medical images to isolate anatomical or pathological areas for further analysis. This process can be done manually or automated by the use of image processing computer packages. Atlas-based segmentation automates this process by the use of a pre-labelled template and a registration algorithm. We developed an ovine brain atlas that can be used as a model for neurological conditions such as Parkinson's disease and focal epilepsy. 17 female Corriedale ovine brains were imaged in-vivo in a 1.5T (low-resolution MRI scanner. 13 of the low-resolution images were combined using a template construction algorithm to form a low-resolution template. The template was labelled to form an atlas and tested by comparing manual with atlas-based segmentations against the remaining four low-resolution images. The comparisons were in the form of similarity metrics used in previous segmentation research. Dice Similarity Coefficients were utilised to determine the degree of overlap between eight independent, manual and atlas-based segmentations, with values ranging from 0 (no overlap to 1 (complete overlap. For 7 of these 8 segmented areas, we achieved a Dice Similarity Coefficient of 0.5-0.8. The amygdala was difficult to segment due to its variable location and similar intensity to surrounding tissues resulting in Dice Coefficients of 0.0-0.2. We developed a low resolution ovine brain atlas with eight clinically relevant areas labelled. This brain atlas performed comparably to prior human atlases described in the literature and to intra-observer error providing an atlas that can be used to guide further research using ovine brains as a model and is hosted online for public access.

  4. Advances in service and operations for ATLAS data management

    International Nuclear Information System (INIS)

    Stewart, Graeme A; Garonne, Vincent; Lassnig, Mario; Molfetas, Angelos; Barisits, Martin; Calvet, Ivan; Beermann, Thomas; Megino, Fernando Barreiro; Campana, Simone; Zhang, Donal; Tykhonov, Andrii; Serfon, Cedric; Oleynik, Danila; Petrosyan, Artem

    2012-01-01

    ATLAS has recorded almost 5PB of RAW data since the LHC started running at the end of 2009. Many more derived data products and complimentary simulation data have also been produced by the collaboration and, in total, 70PB is currently stored in the Worldwide LHC Computing Grid by ATLAS. All of this data is managed by the ATLAS Distributed Data Management system, called Don Quixote 2 (DQ2). DQ2 has evolved rapidly to help ATLAS Computing operations manage these large quantities of data across the many grid sites at which ATLAS runs and to help ATLAS physicists get access to this data. In this paper we describe new and improved DQ2 services: popularity; space monitoring and accounting; exclusion service; cleaning agents; deletion agents. We describe the experience of data management operation in ATLAS computing, showing how these services enable management of petabyte scale computing operations. We illustrate the coupling of data management services to other parts of the ATLAS computing infrastructure, in particular showing how feedback from the distributed analysis system in ATLAS has enabled dynamic placement of the most popular data, helping users and groups to analyse the increasing data volumes on the grid.

  5. Advances in service and operations for ATLAS data management

    Science.gov (United States)

    Stewart, Graeme A.; Garonne, Vincent; Lassnig, Mario; Molfetas, Angelos; Barisits, Martin; Zhang, Donal; Calvet, Ivan; Beermann, Thomas; Barreiro Megino, Fernando; Tykhonov, Andrii; Campana, Simone; Serfon, Cedric; Oleynik, Danila; Petrosyan, Artem; ATLAS Collaboration

    2012-06-01

    ATLAS has recorded almost 5PB of RAW data since the LHC started running at the end of 2009. Many more derived data products and complimentary simulation data have also been produced by the collaboration and, in total, 70PB is currently stored in the Worldwide LHC Computing Grid by ATLAS. All of this data is managed by the ATLAS Distributed Data Management system, called Don Quixote 2 (DQ2). DQ2 has evolved rapidly to help ATLAS Computing operations manage these large quantities of data across the many grid sites at which ATLAS runs and to help ATLAS physicists get access to this data. In this paper we describe new and improved DQ2 services: popularity; space monitoring and accounting; exclusion service; cleaning agents; deletion agents. We describe the experience of data management operation in ATLAS computing, showing how these services enable management of petabyte scale computing operations. We illustrate the coupling of data management services to other parts of the ATLAS computing infrastructure, in particular showing how feedback from the distributed analysis system in ATLAS has enabled dynamic placement of the most popular data, helping users and groups to analyse the increasing data volumes on the grid.

  6. Risk assessment of groundwater environmental contamination: a case study of a karst site for the construction of a fossil power plant.

    Science.gov (United States)

    Liu, Fuming; Yi, Shuping; Ma, Haiyi; Huang, Junyi; Tang, Yukun; Qin, Jianbo; Zhou, Wan-Huan

    2017-12-20

    This paper presents a demonstration of an integrated risk assessment and site investigation for groundwater contamination through a case study, in which the geologic and hydrogeological feature of the site and the blueprint of the fossil power plant (FPP) were closely analyzed. Predictions for groundwater contamination in case of accidents were performed by groundwater modeling system (GMS) and modular three-dimensional multispecies transport model (MT3DMS). Results indicate that the studied site area presents a semi-isolated hydrogeological unit with multiplicity in stratum lithology, the main aquifers at the site are consisted of the filled karst development layer with a thickness between 6.0 and 40.0 m. The poor permeability of the vadose zone at the FPP significantly restricted the infiltration of contaminants through the vadose zone to the subsurface. The limited influence of rarely isotropic porous karstified carbonate rocks on the groundwater flow system premised the simulate scenarios of plume migration. Analysis of the present groundwater chemistry manifested that that the groundwater at the site and the local area are of the HCO 3 -Ca, HCO 3 , and SO 4 -Ca types. A few of the water samples were contaminated by coliform bacteria and ammonia nitrogen as a result of the local cultivation. Prediction results indicate that the impact of normal construction and operation processes on the groundwater environment is negligible. However, groundwater may be partly contaminated within a certain period in the area of leakage from the diesel tanks, the industrial wastewater pool, and the cooling tower water tank in case of accidents. On a positive note, none of the plumes would reach the local sensitive areas for groundwater using. Finally, an anti-seepage scheme and a monitoring program are proposed to safeguard the groundwater protection. The integrated method of the site investigation and risk assessment used in this case study can facilitate the protection of

  7. Hydrogeological and geotechnical requirements for the construction of radioactive waste disposal sites with respect to the CONSOLID-system

    International Nuclear Information System (INIS)

    Giurgea, V.I.

    1999-01-01

    Within the scope of this dissertation, hydrogeological and geotechnical studies were carried out and critically analyzed for the estimation of the site applicability of a proposed low- and intermediate-level radioactive waste site (LILRW) at Cernavoda/Romania. The analysis, studies and modeling had to bring hints concerning the security of the final storage of the Cernovoda site, in accordance with the compliance of the severe recommendations of the IAEA-Vienna (International Atomic Energy Agency). A series of numerical model calculations were performed in completion of the 'in situ'- and laboratory-analyses. These calculations focused principally on the migration of the radionuclides through the base sealing and the geological strata. The results of the calculated models, including numerical simulation of the radionuclides migration, are leading to the conclusion, that even considering the worst possible suppositions and accidents, the groundwater in the deeper underground of the waste disposal site will not be reached by the radionuclides within the institutional control period of 300 years. These modeling results are to be considered the main focus of the thesis. The numerical 2D-simulation of the radionuclides migration through the unsaturated strata, represents a new contribution to the site assessment. The model includes unsaturated soil hydraulic properties determined by laboratory and 'in situ' measurements, as well as the radioactive decay and the ad- and absorbing properties of the geological formations. (orig.) [de

  8. ERCP atlas

    International Nuclear Information System (INIS)

    Pott, G.; Schrameyer, B.

    1989-01-01

    Endoscopic-retrograde cholangio-pancreatography is a diagnostic tool that has become a routine method also in medical centres other than those specializing in the field of gastroenterology. It is estimated that there are about 1000 hospitals in the Federal Republic of Germany applying cholangio-pancreatography as a diagnostic method. Frequently, data interpretation is difficult, because imaging of subsequently detected lesions is found to have been insufficiently differential, or incomplete. The experienced examiner, who knows the pathological processes involved and hence to be expected, will perform the ERCP examination in a specific manner, i.e. purposefully. The ERCP atlas now presents a selection of typical, frequently found conditions, and of rarely encountered lesions. The material has been chosen from a total of 15 000 retrograde cholangio-pancreatographies. The introductory text is relatively short, as it is not so much intended to enhance experienced readers' skill in endoscopic diagnostics, - there is other literature for this purpose -, but rather as a brief survey for less experienced readers. (orig./MG) With 280 figs [de

  9. Production experience with the ATLAS Event Service

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00066086; The ATLAS collaboration; Calafiura, Paolo; Childers, John Taylor; De, Kaushik; Guan, Wen; Maeno, Tadashi; Nilsson, Paul; Tsulaia, Vakhtang; van Gemmeren, Peter; Wenaus, Torre

    2017-01-01

    The ATLAS Event Service (AES) has been designed and implemented for efficient running of ATLAS production workflows on a variety of computing platforms, ranging from conventional Grid sites to opportunistic, often short-lived resources, such as spot market commercial clouds, supercomputers and volunteer computing. The Event Service architecture allows real time delivery of fine grained workloads to running payload applications which process dispatched events or event ranges and immediately stream the outputs to highly scalable Object Stores. Thanks to its agile and flexible architecture the AES is currently being used by grid sites for assigning low priority workloads to otherwise idle computing resources; similarly harvesting HPC resources in an efficient back-fill mode; and massively scaling out to the 50-100k concurrent core level on the Amazon spot market to efficiently utilize those transient resources for peak production needs. Platform ports in development include ATLAS@Home (BOINC) and the Google Comp...

  10. Using containers with ATLAS offline software

    CERN Document Server

    Vogel, Marcelo; The ATLAS collaboration

    2017-01-01

    This paper describes the deployment of ATLAS offline software in containers for software development. For this we are using Docker, which is a lightweight virtualization technology that encapsulates a piece of software inside a complete file system. The deployment of offline releases via containers removes the strict requirement of compatibility between the runtime environment needed for job execution and the configuration of worker nodes at computing sites. If these two are decoupled from each other, sites can upgrade their nodes whenever and however they see fit. In this work, ATLAS software is distributed in containers either via the CernVM File System (CVMFS) or by means of a full ATLAS offline release installation. In software development, separating the build and runtime environment from the development environment allows users to take advantage of many modern code development tools that may not be available in production runtime setups like SLC6. It also frees developers from depending on resources lik...

  11. Production Experience with the ATLAS Event Service

    CERN Document Server

    Benjamin, Douglas; The ATLAS collaboration

    2016-01-01

    The ATLAS Event Service (ES) has been designed and implemented for efficient running of ATLAS production workflows on a variety of computing platforms, ranging from conventional Grid sites to opportunistic, often short-lived resources, such as spot market commercial clouds, supercomputers and volunteer computing. The Event Service architecture allows real time delivery of fine grained workloads to running payload applications which process dispatched events or event ranges and immediately stream the outputs to highly scalable Object Stores. Thanks to its agile and flexible architecture the ES is currently being used by grid sites for assigning low priority workloads to otherwise idle computing resources; similarly harvesting HPC resources in an efficient back-fill mode; and massively scaling out to the 50-100k concurrent core level on the Amazon spot market to efficiently utilize those transient resources for peak production needs. Platform ports in development include ATLAS@Home (BOINC) and the Goggle Comput...

  12. The ATLAS Production System Evolution

    CERN Document Server

    Borodin, Mikhail; The ATLAS collaboration

    2017-01-01

    The second generation of the ATLAS Production System called ProdSys2 is a distributed workload manager that runs daily hundreds of thousands of jobs, from dozens of different ATLAS-specific workflows, across more than a hundred heterogeneous sites. It achieves high utilization by combining dynamic job definition based upon many criteria, such as input and output size, memory requirements and CPU consumption, with manageable scheduling policies and by supporting different kinds of computational resources, such as GRID, clouds, supercomputers and volunteer computers. The system dynamically assigns a group of jobs (task) to a group of geographically distributed computing resources. Dynamic assignment and resource utilization is one of the major features of the system. The Production System has a sophisticated job fault recovery mechanism, which efficiently allows running multi-terabyte tasks without human intervention. We have implemented new features which allow automatic task submission and chaining of differe...

  13. Engineering the ATLAS TAG Browser

    CERN Document Server

    Zhang, Q; The ATLAS collaboration

    2011-01-01

    ELSSI is a web-based event metadata (TAG) browser and event-level selection service for ATLAS. TAGs from all ATLAS physics and Monte Carlo data sets are routinely loaded into Oracle databases as an integral part of event processing. As data volumes increase, more and more sites are joining the distributed TAG data hosting topology[1]. Meanwhile, TAG content and database schemata continue to evolve as new user requirements and additional sources of metadata emerge. All of this has posed many challenges to the development of ELSSI, which must support vast amounts of TAG data while source, content, geographic locations, and user query patterns may change over time. In this paper, we describe some of the challenges encountered in the process of developing ELSSI, and the software engineering strategies adopted to address those challenges. Approaches to management of access to data, browsing, data rendering, query building, query validation, execution, connection management, and communication with auxiliary service...

  14. Engineering the ATLAS TAG Browser

    CERN Document Server

    Zhang, Q; The ATLAS collaboration

    2011-01-01

    ELSSI is a web-based event metadata (TAG) browser and event-level selection service for ATLAS. TAGs from all ATLAS physics and Monte Carlo data sets are routinely loaded into Oracle databases as an integral part of event processing. As data volumes increase, more and more sites are joining the distributed TAG data hosting topology. Meanwhile, TAG content and database schemata continue to evolve as new user requirements and additional sources of metadata emerge. All of this has posed many challenges to the development of ELSSI, which must support vast amounts of TAG data while source, content, geographic locations, and user query patterns may change over time. In this paper, we describe some of the challenges encountered in the process of developing ELSSI, and the software engineering strategies adopted to address those challenges. Approaches to management of access to data, browsing, data rendering, query building, query validation, execution, connection management, and communication with auxiliary services a...

  15. Transportation infrastructure upgrades in the South: A compilation of state plans for construction near nuclear reactor sites

    International Nuclear Information System (INIS)

    1992-03-01

    There are currently 27 nuclear reactor sites located in the southern region. In many instances, the most practicable modes of transportation of spent nuclear fuel from these sites we through the use of highway and rail systems. These two transportation modes have important differences that affect their applicability; chief among these, perhaps, is the fact that while highway systems are publicly owned and maintained rail lines are owned by private entities. For this reason, track condition and maintenance, usage rates and other aspects of rail transport can vary widely. This report reviews southern state, department plans for infrastructure upgrades in the vicinity of nuclear reactor sites. This report includes a summary of planned modifications to bridges, access highways, and rail spurs (where applicable) over the next five years. The information contained herein was gathered from interviews with officials within state departments of transportation. With few exceptions, the contact person was an official within the departmental planning division

  16. Rethinking the Business Model in Construction by the Use of Off-Site System Deliverance: Case of the Shaft Project

    DEFF Research Database (Denmark)

    Thuesen, Christian; Hvam, Lars

    2013-01-01

    This paper presents a set of insights to be used in the development of business models for off-site system deliveries contributing to the development of Off-Site Manufacturing practices (OSM). The theoretical offset for discussing the development of business models is the blue ocean strategy...... of installation shafts. Findings from the development and production of the installation shaft show that system deliveries represent a promising strategy for moving from red ocean competitive environment with the predominant cost+ business model, to a blue ocean situation in which the competition emerges...... in the constant pursue of value creation and cost reduction. On the basis of that system deliverances represent a promising strategy in the future development and application of off-site manufacturing practices. The application of system deliveries is however demanding as it represents a fundamental shift...

  17. Integration of open metal sites and Lewis basic sites for construction of a Cu MOF with rare chiral Oh type of cage for high performance of methane purification

    KAUST Repository

    Shi, Zhan; Meng, Lingkun; Niu, Ziyuan; Liang, Chen; Dong, Xinglong; Liu, Kang; Li, Guanghua; Li, Chunguang; Han, Yu; Feng, Shouhua

    2018-01-01

    A Cu MOF [Cu4(PMTD)2(H2O)3]·20H2O, 1, (Where PMTD is (1,4-phenylenebis(5-methyl-4H-1,2,4-triazole-3,4-diyl)bis(5-carboxylato-3,1-phenylene)bis(hydroperoxymethanide) with rare chiral Oh type of cage and dual functionalities of open metal sites and Lewis basic sites based on a designed U-shaped ligand was synthesized by hydrothermal method. It exhibits high-capacity of CO2, C2 and C3 hydrocarbon storage capacity under atmospheric pressure as well as high H2 (1.96% wt) adsorption capacity at 77K. Methane purification capacity was tested and verified step by step. Isosteric heats (Qst) study reveals that CH4 has the weakest van der Waals host- guest interactions among the seven gases at 298K. Ideal adsorbed solution theory (IAST) calculation reveals that compound 1 is more selective toward CO2, C2H6 and C3H8 over CH4 in further calculating its separation capacity, as exemplified for CO2/CH4 (50:50, 5:95), C2H6/CH4 (50:50, 5:95) or C3H8/CH4 (50:50, 5:95) binary gas mixtures. Breakthrough experiments show that 1 has a significantly higher adsorption capacity for CO2, C2H6 and C3H8 than CH4. The selective adsorption properties of 1 make it a promising candidate for methane purification.

  18. Integration of open metal sites and Lewis basic sites for construction of a Cu MOF with rare chiral Oh type of cage for high performance of methane purification

    KAUST Repository

    Shi, Zhan

    2018-01-18

    A Cu MOF [Cu4(PMTD)2(H2O)3]·20H2O, 1, (Where PMTD is (1,4-phenylenebis(5-methyl-4H-1,2,4-triazole-3,4-diyl)bis(5-carboxylato-3,1-phenylene)bis(hydroperoxymethanide) with rare chiral Oh type of cage and dual functionalities of open metal sites and Lewis basic sites based on a designed U-shaped ligand was synthesized by hydrothermal method. It exhibits high-capacity of CO2, C2 and C3 hydrocarbon storage capacity under atmospheric pressure as well as high H2 (1.96% wt) adsorption capacity at 77K. Methane purification capacity was tested and verified step by step. Isosteric heats (Qst) study reveals that CH4 has the weakest van der Waals host- guest interactions among the seven gases at 298K. Ideal adsorbed solution theory (IAST) calculation reveals that compound 1 is more selective toward CO2, C2H6 and C3H8 over CH4 in further calculating its separation capacity, as exemplified for CO2/CH4 (50:50, 5:95), C2H6/CH4 (50:50, 5:95) or C3H8/CH4 (50:50, 5:95) binary gas mixtures. Breakthrough experiments show that 1 has a significantly higher adsorption capacity for CO2, C2H6 and C3H8 than CH4. The selective adsorption properties of 1 make it a promising candidate for methane purification.

  19. L'expérience ATLAS : pour percer les secrets de l'Univers

    CERN Multimedia

    ATLAS Outreach

    2010-01-01

    Cette brochure en couleurs de 4 pages décrit ATLAS et le LHC, le détecteur interne d'ATLAS, calorimètres, spectromètre à muons, système d'aimant, une brève définition des termes «particules», «matière noire», «de masse», «l'antimatière." Il explique également la collaboration ATLAS et fournit l'adresse du site ATLAS avec quelques images du détecteur et de la collaboration ATLAS au travail.

  20. Projections of cost and on-site manual-labor requirements for constructing electric-generating plants, 1980-1990

    International Nuclear Information System (INIS)

    1982-02-01

    This report represents part of a continuing effort by the Federal Government to forecast the capital and labor required for constructing electric generating capacity additions necessary to accommodate projected economic and population growth in the US and its regions. Information is included on anticipated additions to electric generating capacity, labor requirements for these additions, capital cost requirements, and forecasting models. Coal-fired, nuclear, hydro, and pumped storage power plants are considered in these forecasts

  1. Ecological Wisdom and Inspiration Underlying the Planning and Construction of Ancient Human Settlements: Case Study of Hongcun UNESCO World Heritage Site in China

    Directory of Open Access Journals (Sweden)

    Shanwen Zheng

    2018-04-01

    Full Text Available Human settlements are social-economic-natural complex ecosystems centered on human activities and the most prominent site for the contradictions between humans and the environment. Taking Hongcun, a UNESCO World Heritage site in China, as an example, this paper analyzes the methods and effect of coupling man and nature in Hongcun, summarizes the ecological wisdom of dealing with the relationship between human and nature, and uses this wisdom to shed light on the planning, construction, and management of contemporary urban and rural settlements. Firstly, the study introduces the Human-Natural Intergraded Ecological Planning (HNIEP model’s hypothesis, explaining its foundation and potential principles or approaches. Secondly, using the case study of Hongcun to explain, support, and validate the HNIEP model and its framework, the study found that the unique planning and construction of Hongcun has greatly promoted ecosystem services, such as local microclimate regulation, rainwater runoff regulation, water conservation, landscape aesthetic, and engagement with nature. Thirdly, Hongcun reflects the concept of harmonious coexistence between human and nature, the wisdom of rational use of ecosystem structures, processes and functions, and the wisdom of coupling human activities with the living environment and natural ecosystem. Finally, the paper summarizes the enlightenment brought by both the HNIEP model and Hongcun wisdom to contemporary urban-rural planning and construction management.

  2. Biological assessment of the effects of construction and operation of a depleted uranium hexafluoride conversion facility at the Portsmouth, Ohio,site

    International Nuclear Information System (INIS)

    Van Lonkhuyzen, R.

    2005-01-01

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF 6 ) Management Program evaluated alternatives for managing its inventory of DUF 6 and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF 6 PEIS) in April 1999 (DOE 1999). The DUF 6 inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF 6 PEIS, DOE stated its decision to promptly convert the DUF 6 inventory to a more stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF 6 conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF 6 cylinders stored at ETTP to the Portsmouth site for conversion. This biological assessment (BA) has been prepared by DOE, pursuant to the National Environmental Policy Act of 1969 and the Endangered Species Act of 1974, to evaluate potential impacts to federally listed species from the construction and operation of a conversion facility at the DOE Portsmouth site. The Indiana bat is known to occur in the area of the Portsmouth site and may potentially occur on the site during spring or summer. Evaluations of the Portsmouth site indicated that most of the site was found to have poor summer habitat for the Indiana bat because of the small size, isolation, and insufficient maturity of the few woodlands on the site. Potential summer habitat for the Indiana bat was identified outside the developed area bounded by Perimeter Road, within the corridors

  3. Performance of the ATLAS semiconductor tracker

    CERN Document Server

    Alpigiani, C; The ATLAS collaboration

    2014-01-01

    We report the operation and performance of the ATLAS Semi-Conductor Tracker (SCT) functioning in a high luminosity and high radiation environment. The SCT is part of the inner tracking system of the ATLAS experiment at CERN and is constructed of 4088 modules assembled from silicon-strip sensors for a total of 6.3 million channels more than 99 % of which were fully functional throughout all data taking periods. Noise occupancy and hit efficiency as well as the Lorentz angle and radiation damage measurements will be discussed in details.

  4. Progress in ATLAS central solenoid magnet

    CERN Document Server

    Yamamoto, A; Makida, Y; Tanaka, K; Haruyama, T; Yamaoka, H; Kondo, T; Mizumaki, S; Mine, S; Wada, K; Meguro, S; Sotoki, T; Kikuchi, K; ten Kate, H H J

    2000-01-01

    The ATLAS central solenoid magnet is being developed to provide a magnetic field of 2 Tesla in the central tracking volume of the ATLAS detector under construction at the CERN/LHC project. The solenoid coil design features high-strength aluminum stabilized superconductor to make the coil thinnest while maintaining its stability and the pure-aluminum strip technique for quench protection and safety. The solenoid coil is installed in a common cryostat with the LAr calorimeter in order to minimize the cryostat wall. A transparency of 0.66 radiation length is achieved with these integrated efforts. The progress in the solenoid coil fabrication is reported. (8 refs).

  5. Site investigations, design, construction, operation, shutdown and surveillance of repositories for low- and intermediate-level radioactive wastes in rock cavities

    International Nuclear Information System (INIS)

    1984-01-01

    The report provides an overview and technical guidelines for considerations and for activities to be undertaken for safety assessment, site investigations, design, construction, operation, shutdown and surveillance of repositories for the disposal of low- and intermediate-level radioactive wastes in rock cavities. A generalized sequence of investigations is introduced which proceeds through region and site selection to the stage where the site is confirmed by detailed geoscientific investigations as being suitable for a waste repository. The different procedures and somewhat specific investigative needs with respect to existing mines are dealt with separately. General design, as well as specific requirements with respect to the different stages of design and construction, are dealt with. A review of activities related to the operational and post-operational stages of repositories in rock cavities is presented. The report describes in general terms the procedures related to different stages of disposal operation; also the conditions for shutdown together with essential shutdown and sealing activities and the related safety assessment requirements. Guidance is also given on the surveillance programme which will allow for inspection, testing, maintenance and security of a disposal facility during the operational phase, as well as for the post-operational stage for periods determined as necessary by the national authorities

  6. The ATLAS detector control system

    International Nuclear Information System (INIS)

    Schlenker, S.; Arfaoui, S.; Franz, S.

    2012-01-01

    The ATLAS experiment is one of the multi-purpose experiments at the Large Hadron Collider (LHC), constructed to study elementary particle interactions in collisions of high-energy proton beams. Twelve different sub-detectors as well as the common experimental infrastructure are supervised by the Detector Control System (DCS). The DCS enables equipment supervision of all ATLAS sub-detectors by using a system of more that 130 server machines running the industrial SCADA product PVSS. This highly distributed system reads, processes and archives of the order of 10 6 operational parameters. Higher level control system layers allow for automatic control procedures, efficient error recognition and handling, and manage the communication with external systems such as the LHC. First, this contribution describes the status of the ATLAS DCS and the experience gained during the LHC commissioning and the first physics data taking operation period. Secondly, the future evolution and maintenance constraints for the coming years and the LHC high luminosity upgrades are outlined. (authors)

  7. Environmental Assessment for Tower Construction at the Brandywine Communication Receiver Site, Prince George’s County, Maryland

    Science.gov (United States)

    2005-05-01

    Poecile atricapilla), northern cardinal (Cardinalis cardinalis), and eastern mockingbird (Mimus polyglottos). The Brandywine Site is in the...birds in poor weather conditions (e.g., low cloud ceiling, fog, rain, or poor visibility), and have caused massive bird kills when nocturnal...resources that the Service is authorized to protect. Take (i.e., killing ) of migratory birds by any person without authorization may constitute a

  8. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 2, Sections 1-6

    Energy Technology Data Exchange (ETDEWEB)

    1991-04-01

    This (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains the analysis of programmatic alternatives, project alternatives, affected environment of alternative sites, environmental consequences, and environmental regulations and permit requirements.

  9. Quality of life and probable psychological distress among male workers at a construction site, Kolar district, Karnataka, India.

    Science.gov (United States)

    Mathew, Geethu; Ramesh, Naveen; Shanbhag, Deepthi; Goud, Ramakrishna; Subramanian, Sharan; Lobo, Carol; Xavier, Alex; Dasari, Prudhvi

    2016-01-01

    The construction industry, which mainly consists of migrant labouers is one of the largest employers in the unorganized sector in India. These workers work in poor conditions and are often vulnerable to exploitation. These workers also do not have health care benefits and often these factors lead to poor quality of life (QOL) and psychological distress. To assess the QOL, probable psychological distress and associated factors among male construction workers. A cross-sectional study was conducted between September 2013 and November 2013 among 404 male workers. These construction workers were enrolled by consecutive sampling at a construction area in Kolar district, Kaarnataka, India. The study tools used were World Health Organization (WHO) QOL-BREF and 12-Item General Health Questionnaire (GHQ-12) to assess QOL and probable psychological distress, respectively. The transformed scores in WHO QOL-BREF in all four domains ranged 0-100. The four domain scores are scaled in a positive direction with higher scores indicating a higher QOL. Associations were done using statistical tests such as Chi-square, correlation, regression, independent samples t-test, and analysis of variance (ANOVA). A total of 404 male workers with a mean age of 25.6 ± 7.3 years were studied. Mean scores of various domains of QOL were 68.5 ± 13.7 (physical), 59.9 ± 13.5 (psychological), 64.3 ± 16.4 (social), and 44.1 ± 12.8 (environmental). On the self- rating scale, 59 (14.6%) workers were rated as having poor QOL. The prevalence of probable psychological distress was 27.5%. Factors such as increasing age, being currently married, and low educational status were found to be significantly associated (P psychological distress. There was a significant negative correlation (P psychological distress and a positive correlation between income and QOL. The QOL in the environmental domain, which mainly deals with living conditions, health, and recreational facilities was found to be poor and there

  10. The design and construction of large diameter pre-filter packed recovery wells at the Ninth Avenue Superfund Site

    International Nuclear Information System (INIS)

    Lombardo, S.L.; Maley, T.J.; Bono, B.A.

    1992-01-01

    Large diameter groundwater/oil recovery wells were installed in an unconfined sand aquifer at the Ninth Avenue Superfund Site in Gary, Indiana. To assure adequate filter packs, prefilter packed groundwater/oil recovery wells were selected to minimize silting by using appropriate screen slot size and filter pack. A properly sized filter pack was necessary to prevent the formation material from entering the well. During field drilling operations, open-quotes having sandsclose quotes and silting of existing wells were encountered. By using sieve analyses of the native aquifer soil, described by Driscoll (1989), the filter pack and screen slot size were selected. Prefilter packed well screens were selected for this site to assure the presence of a uniform filter pack, thus minimizing siltation in the wells. A prefilter packed well screen consists of a double screen with the interstitial space filled with granular filter pack material designed specifically for site conditions. These wells provide the adequate filter pack without the need to add additional filter pack material outside the well screen. Wells were installed using 12 1/4 inch ID hollow stem augers. This methodology is EPA-approved, expeditious, and inexpensive. Level B personal protective equipment was required during installation. Therefore, the advantages of hollow stem drilling include short drilling time and no circulation fluids. The 14 recovery wells were successfully installed in 14 days using the hollow stem auger drilling technique. Observations during well development revealed little or no silt present in purged groundwater

  11. AN INNOVATIVE APPROACH FOR CONSTRUCTING AN IN-SITU BARRIER FOR STRONTIUM-90 AT THE HANFORD SITE WASHINGTON

    Energy Technology Data Exchange (ETDEWEB)

    FABRE RJ

    2008-12-08

    Efforts to reduce the flux of Sr-90 to the Columbia River from Hanford Site 100-N Area past-practice liquid waste disposal sites have been underway since the early 1990s. Termination of all liquid discharges to the ground in 1993 was a major step toward meeting this goal. However, Sr-90 adsorbed on aquifer solids beneath liquid waste disposal sites and extending beneath the near-shore riverbed remains a continuing contaminant source to groundwater and the Columbia River. The initial pump-and-treat system proved to be ineffective as a long-term solution because of the geochemical characteristics of Sr-90. Following an evaluation of potential Sr-90 treatment technologies and their applicability under 100-NR-2 Operable Unit hydrogeologic conditions, the U.S. Department of Energy and the Washington State Department of Ecology agreed to evaluate apatite sequestration as the primary remedial technology, combined with a secondary polishing step utilizing phytoextraction if necessary. Aqueous injection was initiated in July 2005 to assess the efficacy of in-situ apatite along the 100 m of shoreline where Sr-90 concentrations are highest. The remedial technology is being developed by Pacific Northwest National Laboratory. CH2M Hill Plateau Remediation Company is implementing this technology in the field with support from PNNL.

  12. An Innovative Approach for Constructing an In-Situ Barrier for Strontium-90 at the Hanford Site, Washington - 9325

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, K. M.; Fabre, Russel J.; Vermeul, Vincent R.; Szecsody, James E.; Fellows, Robert J.; Williams, Mark D.; Fruchter, Jonathan S.

    2008-12-10

    Efforts to reduce the flux of Sr-90 to the Columbia River from Hanford Site 100-N Area past-practice liquid waste disposal sites have been underway since the early 1990s. Termination of all liquid discharges to the ground in 1993 was a major step toward meeting this goal. However, Sr 90 adsorbed on aquifer solids beneath liquid waste disposal sites and extending beneath the near-shore riverbed remains a continuing contaminant source to groundwater and the Columbia River. The initial pump-and treat system proved to be ineffective as a long-term solution because of the geochemical characteristics of Sr-90. Following an evaluation of potential Sr-90 treatment technologies and their applicability under 100 NR-2 Operable Unit hydrogeologic conditions, the U.S. Department of Energy and the Washington State Department of Ecology agreed to evaluate apatite sequestration as the primary remedial technology, combined with a secondary polishing step utilizing phytoextraction if necessary. Aqueous injection was initiated in July 2005 to assess the efficacy of in-situ apatite along the 100 m of shoreline where Sr-90 concentrations are highest. The remedial technology is being developed by Pacific Northwest National Laboratory. CH2M Hill Plateau Remediation Company is implementing this technology in the field with support from PNNL.

  13. Characterisation of Beaver Habitat Parameters That Promote the Use of Culverts as Dam Construction Sites: Can We Limit the Damage to Forest Roads?

    Directory of Open Access Journals (Sweden)

    Geneviève Tremblay

    2017-12-01

    Full Text Available The use of forest roads as foundations for dam construction by beavers is a recurrent problem in the management of forest road networks. In order to limit the damage to forest roads, our goal was to calculate the probability of beaver dam installation on culverts, according to surrounding habitat parameters, which could allow for improvement in the spatial design of new roads that minimise conflicts with beavers. Comparisons of culverts with (n = 77 and without (n = 51 dams in northwestern Quebec showed that catchment surface, cumulate length of all local streams within a 2-km radius, and road embankment height had a negative effect on the probability of dam construction on culverts, while flow level and culvert diameter ratio had a positive effect. Nevertheless, predicted probabilities of dam construction on culverts generally exceeded 50%, even on sites that were less favourable to beavers. We suggest that it would be more reasonable to take their probable subsequent presence into account at the earliest steps of road conception. Installing mitigation measures such as pre-dams during road construction would probably reduce the occurrence of conflicts with beavers and thus reduce the maintenance costs of forest roads.

  14. ATLAS honours one of its suppliers

    CERN Multimedia

    2003-01-01

    On 12 February the Netherlands firm Schelde Exotech was awarded a prize for best ATLAS supplier for the construction of the two vacuum chambers for the ATLAS endcap toroid magnets. The award for best supplier is handed over to representatives of the firm Schelde Exotech in front of one of the two vacuum chambers built by the firm. From left to right: E. Baynham (RAL), H. Geerink (NIKHEF), Y. Lefevere (NIKHEF), J. Engelen (NIKHEF), P. Jenni (CERN), E. Holtom (RAL), R. Boddaert (Schelde Exotech), G. Luijckx (NIKHEF), H. Klumpus (Schelde Exotech), M. Nessi (CERN), H. ten Kate (CERN), M. Nordberg (CERN), H. Hoffmann (CERN).This ceremony has now become something of a tradition. For the third consecutive year, ATLAS has given best supplier awards for the most exceptional contributors to the construction of the future detector. The Netherlands firm Schelde Exotech has just received the award for the construction of the two vacuum chambers for the ATLAS endcap toroid magnets. With a diameter of 11 metres and a volum...

  15. Exploiting Virtualization and Cloud Computing in ATLAS

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    This work will present the current status of the Virtualization and Cloud Computing R&D project in ATLAS Distributed Computing. First, strategies for deploying PanDA queues on cloud sites will be discussed, including the introduction of a "cloud factory" for managing cloud VM instances. Ne...

  16. ATLAS semiconductor tracker installed into its barrel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The ATLAS silicon tracker is installed in the silicon tracker barrel. Absolute precision was required in this operation to ensure that the tracker was inserted without damage through minimal clearance. The installation was performed in a clean room on the CERN site so that no impurities in the air would contaminate the tracker's systems.

  17. Evolving ATLAS Computing For Today’s Networks

    CERN Document Server

    Campana, S; The ATLAS collaboration; Jezequel, S; Negri, G; Serfon, C; Ueda, I

    2012-01-01

    The ATLAS computing infrastructure was designed many years ago based on the assumption of rather limited network connectivity between computing centres. ATLAS sites have been organized in a hierarchical model, where only a static subset of all possible network links can be exploited and a static subset of well connected sites (CERN and the T1s) can cover important functional roles such as hosting master copies of the data. The pragmatic adoption of such simplified approach, in respect of a more relaxed scenario interconnecting all sites, was very beneficial during the commissioning of the ATLAS distributed computing system and essential in reducing the operational cost during the first two years of LHC data taking. In the mean time, networks evolved far beyond this initial scenario: while a few countries are still poorly connected with the rest of the WLCG infrastructure, most of the ATLAS computing centres are now efficiently interlinked. Our operational experience in running the computing infrastructure in ...

  18. Status of the uranium upgrade of ATLAS

    International Nuclear Information System (INIS)

    Bollinger, L.M.; Billquist, P.J.; Bogaty, J.M.; Clifft, B.E.; Markovich, P.; Munson, F.H.; Pardo, R.C.; Shepard, K.W.; Zinkann, G.P.

    1991-01-01

    The ATLAS Positive Ion Injector (PII) is designed to replace the tandem injector for the ATLAS heavy-ion facility. When the PII project is complete, ATLAS will be able to accelerate all ions through uranium to energies above the Coulomb barrier. PII consists of an ECR ion source on a 350 KV platform and a very low-velocity superconducting linac. The linac is composed of an independently-phased array of superconducting four-gap interdigital resonators which accelerate over a velocity range of .007c to .05c. the PII project is approximately 75% complete. Beam tests and experiments using the partially completed PII have demonstrated that the technical design goals are being met. The design, construction status, and results of recent operational experience using the PII will be discussed. 10 refs., 2 figs., 1 tab

  19. ATLAS: Applications experiences and further developments

    International Nuclear Information System (INIS)

    Beraha, D.; Pointner, W.; Voggenberger, T.

    1999-01-01

    An overview of the plant analyzer ATLAS is given, describing its configuration, the process models and the supplementary modules which enhance the functionality of ATLAS for a range of applications in reactor safety analysis. These modules include the Reliability Advisory System, which supports the user by information from probabilistic safety analysis, the Procedure Analysis for development and test of emergency operating procedures, and a diagnostic system for steam-generator tube rupture. The development of plant specific analysers for various power plants is described, and the user experience related. Finally, the intended further development directions are discussed, centering on a tracking simulator, the migration of the visualisation system to Windows NT, and the construction of the Analysis Center as a multimedia environment for the operation of ATLAS. (author)

  20. Status of the uranium upgrade of ATLAS

    Energy Technology Data Exchange (ETDEWEB)

    Bollinger, L.M.; Billquist, P.J.; Bogaty, J.M.; Clifft, B.E.; Markovich, P.; Munson, F.H.; Pardo, R.C.; Shepard, K.W.; Zinkann, G.P.

    1991-01-01

    The ATLAS Positive Ion Injector (PII) is designed to replace the tandem injector for the ATLAS heavy-ion facility. When the PII project is complete, ATLAS will be able to accelerate all ions through uranium to energies above the Coulomb barrier. PII consists of an ECR ion source on a 350 KV platform and a very low-velocity superconducting linac. The linac is composed of an independently-phased array of superconducting four-gap interdigital resonators which accelerate over a velocity range of .007c to .05c. the PII project is approximately 75% complete. Beam tests and experiments using the partially completed PII have demonstrated that the technical design goals are being met. The design, construction status, and results of recent operational experience using the PII will be discussed. 10 refs., 2 figs., 1 tab.