WorldWideScience

Sample records for assessing system performance

  1. Assessing Performance of Botswana’s Public Hospital System: The Use of the World Health Organization Health System Performance Assessment Framework

    Directory of Open Access Journals (Sweden)

    Onalenna Seitio-Kgokgwe

    2014-09-01

    Full Text Available Background Very few studies have assessed performance of Botswana public hospitals. We draw from a large research study assessing performance of the Botswana Ministry of Health (MoH to evaluate the performance of public hospital system using the World Health Organization Health Systems Performance Assessment Framework (WHO HSPAF. We aimed to evaluate performance of Botswana public hospital system; relate findings of the assessment to the potential for improvements in hospital performance; and determine the usefulness of the WHO HSPAF in assessing performance of hospital systems in a developing country. Methods This article is based on data collected from document analysis, 54 key informants comprising senior managers and staff of the MoH (N= 40 and senior officers from stakeholder organizations (N= 14, and surveys of 42 hospital managers and 389 health workers. Data from documents and transcripts were analyzed using content and thematic analysis while data analysis for surveys was descriptive determining proportions and percentages. Results The organizational structure of the Botswana’s public hospital system, authority and decision-making are highly centralized. Overall physical access to health services is high. However, challenges in the distribution of facilities and inpatient beds create inequities and inefficiencies. Capacity of the hospitals to deliver services is limited by inadequate resources. There are significant challenges with the quality of care. Conclusion While Botswana invested considerably in building hospitals around the country resulting in high physical access to services, the organization and governance of the hospital system, and inadequate resources limit service delivery. The ongoing efforts to decentralize management of hospitals to district level entities should be expedited. The WHO HSPAF enabled us to conduct a comprehensive assessment of the public hospital system. Though relatively new, this approach proved

  2. Assessing the Performance of Natural Resource Systems

    Directory of Open Access Journals (Sweden)

    Bruce Campbell

    2002-01-01

    Full Text Available Assessing the performance of management is central to natural resource management, in terms of improving the efficiency of interventions in an adaptive-learning cycle. This is not simple, given that such systems generally have multiple scales of interaction and response; high frequency of nonlinearity, uncertainty, and time lags; multiple stakeholders with contrasting objectives; and a high degree of context specificity. The importance of bounding the problem and preparing a conceptual model of the system is highlighted. We suggest that the capital assets approach to livelihoods may be an appropriate organizing principle for the selection of indicators of system performance. In this approach, five capital assets are recognized: physical, financial, social, natural, and human. A number of principles can be derived for each capital asset; indicators for assessing system performance should cover all of the principles. To cater for multiple stakeholders, participatory selection of indicators is appropriate, although when cross-site comparability is required, some generic indicators are suitable. Because of the high degree of context specificity of natural resource management systems, a typology of landscapes or resource management domains may be useful to allow extrapolation to broader systems. The problems of nonlinearities, uncertainty, and time lags in natural resource management systems suggest that systems modeling is crucial for performance assessment, in terms of deriving "what would have happened anyway" scenarios for comparison to the measured trajectory of systems. Given that a number of indicators are necessary for assessing performance, the question becomes whether these can be combined to give an integrative assessment. We explore five possible approaches: (1 simple additive index, as used for the Human Development Index; (2 derived variables (e.g., principal components as the indices of performance; (3 two-dimensional plots of

  3. Performance assessment for underground radioactive waste disposal systems

    International Nuclear Information System (INIS)

    1985-01-01

    A waste disposal system comprises a number of subsystems and components. The performance of most systems can be demonstrated only indirectly because of the long period that would be required to test them. This report gives special attention to performance assessment of subsystems within the total waste disposal system, and is an extension of an IAEA report on Safety Assessment for the Underground Disposal of Radioactive Wastes

  4. How Do States Integrate Performance Assessment in Their Systems of Assessment?

    Science.gov (United States)

    Stosich, Elizabeth Leisy; Snyder, Jon; Wilczak, Katie

    2018-01-01

    This paper reviews state strategies for incorporating performance assessment in policy and practice. Specifically, the paper reviews the use of performance assessment in 12 states in the Innovation Lab Network, a group committed to developing systems of assessment that provide meaningful measures of college and career readiness. This review…

  5. Performance assessment techniques for groundwater recovery and treatment systems

    Energy Technology Data Exchange (ETDEWEB)

    Kirkpatrick, G.L. [Environmental Resources Management, Inc., Exton, PA (United States)

    1993-03-01

    Groundwater recovery and treatment (pump and treat systems) continue to be the most commonly selected remedial technology for groundwater restoration and protection programs at hazardous waste sites and RCRA facilities nationwide. Implementing a typical groundwater recovery and treatment system includes the initial assessment of groundwater quality, characterizing aquifer hydrodynamics, recovery system design, system installation, testing, permitting, and operation and maintenance. This paper focuses on methods used to assess the long-term efficiency of a pump and treat system. Regulatory agencies and industry alike are sensitive to the need for accurate assessment of the performance and success of groundwater recovery systems for contaminant plume abatement and aquifer restoration. Several assessment methods are available to measure the long-term performance of a groundwater recovery system. This paper presents six assessment techniques: degree of compliance with regulatory agency agreement (Consent Order of Record of Decision), hydraulic demonstration of system performance, contaminant mass recovery calculation, system design and performance comparison, statistical evaluation of groundwater quality and preferably, integration of the assessment methods. Applying specific recovery system assessment methods depends upon the type, amount, and quality of data available. Use of an integrated approach is encouraged to evaluate the success of a groundwater recovery and treatment system. The methods presented in this paper are for engineers and corporate management to use when discussing the effectiveness of groundwater remediation systems with their environmental consultant. In addition, an independent (third party) system evaluation is recommended to be sure that a recovery system operates efficiently and with minimum expense.

  6. Methodology for assessing performance of waste management systems

    International Nuclear Information System (INIS)

    Meshkov, N.K.; Herzenberg, C.L.; Camasta, S.F.

    1988-01-01

    The newly revised draft DOE Order 5820.2, Chapter 3, requires that DOE low-level waste shall be managed on a systematic basis using the most appropriate combination of waste generation reduction, segregation, treatment, and disposal practices so that the radioactive components are contained and the overall cost effectiveness is minimized. This order expects each site to prepare and maintain an overall waste management systems performance assessment supporting the combination of waste management practices used in generation reduction segregation, treatment, packaging, storage, and disposal. A document prepared by EG and G Idaho, Inc. for the Department of Energy called Guidance for Conduct of Waste Management Systems Performance Assessment is specifically intended to provide the approach necessary to meet the systems performance assessment requirement of DOE Order 5820.2, Chapter 3, and other applicable state regulations dealing with LLW (low-level radioactive wastes). Methods and procedures are needed for assessing the performance of a waste management system. This report addresses this need. The purpose of the methodology provided in this report is to select the optimal way to manage particular sets of waste streams from generation to disposal in a safe and cost-effective manner, and thereby assist the DOE LLW mangers in complying with the DOE Order 5820.2, Chapter 3, and the associated guidance document

  7. Performance assessment of cogeneration and trigeneration systems for small scale applications

    International Nuclear Information System (INIS)

    Angrisani, Giovanni; Akisawa, Atsushi; Marrasso, Elisa; Roselli, Carlo; Sasso, Maurizio

    2016-01-01

    Highlights: • Indices and methods to assess the performance of polygeneration systems. • Index to evaluate the economic feasibility of trigeneration system is introduced. • Thermo-economic analysis is performed considering three commercial cogenerators. • Sensitivity analysis varying reference electric efficiency for European Countries. • Sensitivity analysis varying environmental and economic parameters. - Abstract: Cogeneration and trigeneration systems can contribute to the reduction of primary energy consumption and greenhouse gas emissions in residential and tertiary sectors, by reducing fossil fuels demand and grid losses with respect to conventional systems. To evaluate the performance of these systems, several indices and assessment methodologies can be used, due to the high complexity of such systems, which can consist of several energy conversion devices and can perform bidirectional interactions with external electric and thermal grids. In this paper, a review of the available indices and methodologies to assess the performances of polygeneration systems is provided. An index (TSS_t_r_i) aimed to assess the economic feasibility of a trigeneration system is also introduced and discussed. This activity started in the framework of the International Energy Agency Annex 54 project (“Integration of Micro-Generation and Related Energy Technologies in Buildings”), where research groups shared their expertise about methods applied in each Country to evaluate the performance of polygeneration systems. It was concluded that a thermo-economic analysis comparing the performance of a polygeneration system with those of a reference benchmark scenario, is a very suitable assessment method. Some of the reviewed methodologies are then applied to small scale commercial cogenerators. The sensitivity analysis is performed considering different reference average values of electric efficiency, unitary natural gas and electricity prices, and emission factors for

  8. Comment Response on the Final Report: Peer Review of the Total System Performance Assessment-Viability Assessment (TSPA-VA)

    International Nuclear Information System (INIS)

    Pendleton, M. W.

    1999-01-01

    The Management and Operating Contractor established a Performance Assessment Peer Review Panel (hereinafter ''the Panel'') at the request of the U.S. Department of Energy Yucca Mountain Site Characterization Office. The objectives of the peer review were to provide: (1) A formal, independent evaluation and critique of Viability Assessment of a Repository at Yucca Mountain: Total System Performance Assessment, Volume 3 (DOE 1998a; hereinafter ''Total System Performance Assessment-Viability Assessment'') that was conducted in support of the Viability Assessment of a Repository at Yucca Mountain (DOE 1998b). (2) Suggestions for improvements as the U.S. Department of Energy prepares to develop the documentation for a Total System Performance Assessment to support a potential License Application. The Panel conducted a phased review over a two-year period to observe the development and, ultimately, to review the Total System Performance Assessment-Viability Assessment (DOE 1998a). During the development of the Total System Performance Assessment-Viability Assessment (DOE 1998a), the Panel submitted three Interim Reports (Whipple et al., 1997a, 1997b, and 1998) to the Management and Operating Contractor with recommendations and comments on the process models, model abstractions, and draft documentation for the Total System Performance Assessment-Viability Assessment (DOE 1998a). The Panel's Final Report Total System Performance Assessment Peer Review Panel (Whipple et al. 1999; hereinafter ''Final Report'') on the Total System Performance Assessment-Viability Assessment (DOE 1998a) is based primarily on the completed Total System Performance Assessment-Viability Assessment (DOE 1998a), the Total System Performance Assessment-Viability Assessment (TSPA-VA) Analyses Technical Basis Document (CRWMS M and O 1998), and the cited references. The Final Report (Whipple et al. 1999) includes the major points from the three Interim Reports (Whipple et al. 1997a, 1997b, and 1998

  9. Performance assessment of hybrid power generation systems: Economic and environmental impacts

    International Nuclear Information System (INIS)

    Al-Sharafi, Abdullah; Yilbas, Bekir S.; Sahin, Ahmet Z.; Ayar, T.

    2017-01-01

    Highlights: • A double-step optimization tool for hybrid power generation systems is introduced. • Economical aspects and the impact of the system on the environment are considered. • A hybrid system comprises PV array-wind turbine-battery-diesel engine is considered. • Real time analysis of the system for full year simulation is carried out. • System optimum configuration at point where total performance index is maximized. - Abstract: This article aims to introduce a double-step performance assessment tool for the hybrid power generation systems. As a case study, a hybrid system comprising PV array, wind-turbine, battery bank and diesel engine is incorporated in hourly based simulations to meet power demand of a residence unit at Dhahran area, Kingdom of Saudi Arabia. Different indicators related to economical and environmental performance assessments of the hybrid system have been considered. In the economic related assessment case, cost of electricity, energy excess percentage, and operating life cycle indicators have been considered and combined to develop the first overall performance index. Renewable contribution, renewable source availability and environmental impact indicators have been considered for the environmental assessment case and they are combined in the second performance index. For either economical or environmental cases, the optimum configuration of the system is achieved by maximizing the first and second overall performance indicators. This innovative optimization tools gives the designer the freedom to assign suitable weights associated with economical aspect, environmental impact, governmental regulations and social impact, for the first and second overall performance indicators, and combine them in the total performance index. The optimum system configuration is at the point where the total performance index is maximized.

  10. Total-System Performance Assessment for the Yucca Mountain Site

    International Nuclear Information System (INIS)

    Wilson, M.L.

    2001-01-01

    Yucca Mountain, Nevada, is under consideration as a potential site for a repository for high-level radioactive waste. Total-system performance-assessment simulations are performed to evaluate the safety of the site. Features, events, and processes have been systematically evaluated to determine which ones are significant to the safety assessment. Computer models of the disposal system have been developed within a probabilistic framework, including both engineered and natural components. Selected results are presented for three different total-system simulations, and the behavior of the disposal system is discussed. The results show that risk is dominated by igneous activity at early times, because the robust waste-package design prevents significant nominal (non-disruptive) releases for tens of thousands of years or longer. The uncertainty in the nominal performance is dominated by uncertainties related to waste-package corrosion at early times and by uncertainties in the natural system, most significantly infiltration, at late times

  11. How Should Blood Glucose Meter System Analytical Performance Be Assessed?

    Science.gov (United States)

    Simmons, David A

    2015-08-31

    Blood glucose meter system analytical performance is assessed by comparing pairs of meter system and reference instrument blood glucose measurements measured over time and across a broad array of glucose values. Consequently, no single, complete, and ideal parameter can fully describe the difference between meter system and reference results. Instead, a number of assessment tools, both graphical (eg, regression plots, modified Bland-Altman plots, and error grid analysis) and tabular (eg, International Organization for Standardization guidelines, mean absolute difference, and mean absolute relative difference) have been developed to evaluate meter system performance. The strengths and weaknesses of these methods of presenting meter system performance data, including a new method known as Radar Plots, are described here. © 2015 Diabetes Technology Society.

  12. Thermodynamic performance assessment of wind energy systems: An application

    International Nuclear Information System (INIS)

    Redha, Adel Mohammed; Dincer, Ibrahim; Gadalla, Mohamed

    2011-01-01

    In this paper, the performance of wind energy system is assessed thermodynamically, from resource and technology perspectives. The thermodynamic characteristics of wind through energy and exergy analyses are considered and both energetic and exergetic efficiencies are studied. Wind speed is affected by air temperature and pressure and has a subsequent effect on wind turbine performance based on wind reference temperature and Bernoulli's equation. VESTAS V52 wind turbine is selected for (Sharjah/UAE). Energy and exergy efficiency equations for wind energy systems are further developed for practical applications. The results show that there are noticeable differences between energy and exergy efficiencies and that exergetic efficiency reflects the right/actual performance. Finally, exergy analysis has been proven to be the right tool used in design, simulation, and performance evaluation of all renewable energy systems. -- Highlights: → In this research the performance of wind energy system is assessed thermodynamically, from resource and technology perspectives. → Energy and exergy equations for wind energy systems are further developed for practical applications. → Thermodynamic characteristics of wind turbine systems through energetic and exergetic efficiencies are evaluated from January till March 2010. → Exergy efficiency describes the system irreversibility and the minimum irreversibility exists when the wind speed reaches 11 m/s. → The power production during March was about 17% higher than the month of February and 66% higher than January.

  13. 5th Total System Performance Assessment Workshop

    International Nuclear Information System (INIS)

    Hwang, Yong Soo; Lee, Youn Myoung; Kang, Chul Hyung; Lee, Sung Ho

    2009-07-01

    Research items on safety assessment of high-level waste repository have been proposed by external invited experts outside KAERI and discussed extensively during the annual 5th performance assessment workshop prepared by safety assessment group in KAERI. This could be useful to set up R and D plans necessary for the next phase of mid- and long-term reaserch area regarding the safety assessment of high-level waste repository. Through the research and the presentation, HLW-related research and development area including such specific research items as current status of HLW safety assessment research, current requirement for the licensing of the repository system, priority on research area, data base building for the safety assessment, source-term modeling as well as safety case, among many others, have been discussed and summarized

  14. Performance assessment of nuclear waste isolation systems

    International Nuclear Information System (INIS)

    Lee, W.L.

    1984-01-01

    A number of concepts have been proposed for the isolation of highly radioactive wastes, and it will be necessary to demonstrate the safety of such systems. In many countries including the U.S., the waste isolation system of choice is deep mined geologic repositories. Because of the complex nature of the multiple isolation barriers afforded by mined geologic disposal systems, and the long isolation periods involved, this demonstration can only be indirect. In recent years this indirect demonstration, mostly through mathematical modeling, is called performance assessment. Performance Assessment can be defined to mean the development, testing, and application of a series of mathematical models and computer codes which traces the movement of radionuclides from a waste isolation system to the biosphere and any resultant dose to man. In modeling such a repository system, it is often convenient to divide it into a number of subsystems, there may be several different processes that need to be modeled, individually and interactively. For instance, this waste package will probably consist of a waste form such as borosilicate glass containing the radioisotopes, a canister, an overpack material such as steel or copper, and a buffer material such as bentonite. The processes to be modeled at the waste package scale include radioisotope inventory and decay, thermal radiation, radiolysis effects, corrosion, leading and fluid flow. In tracing radionuclide transport through rock, the processes of importance are probably groundwater flow, and sorption and retardation of radionuclide movement

  15. Total system performance assessment - 1995: An evaluation of the potential Yucca Mountain repository

    International Nuclear Information System (INIS)

    Atkins, J.E.; Lee, J.H.; Lingineni, S.; Mishra, S.; McNeish, J.A.; Sassani, D.C.; Sevougian, S.D.

    1995-11-01

    The U.S. Department of Energy (DOE) is currently investigating the feasibility of permanently disposing the nation's commercial high-level radioactive wastes (in the form of spent fuel from the over 100 electric power-generating nuclear reactors across the U.S.) and a portion of the defense high-level radioactive wastes (currently stored at federal facilities around the country) in the unsaturated tuffaceous rocks at Yucca Mountain, Nevada. Quantitative predictions based on the most current understanding of the processes and parameters potentially affecting the long-term behavior of the disposal system are used to assess the ability of the site and its associated engineered designs to meet regulatory objectives of the US NRC and the US EPA. The evaluation of the ability of the overall system to meet the performance objectives specified in the applicable regulatory standards has been termed total system performance assessment (TSPA). Total system performance assessments require the explicit quantification of the relevant processes and process interactions. In addition assessments are useful to help define the most significant processes, the information gaps and uncertainties and therefore the additional information required for more robust and defensible assessment of the overall performance. The aim of any total system performance assessment is to be as complete and reasonably conservative as possible and to assure that the descriptions of the predictive models and parameters are sufficient to ascertain their accuracy. Total system performance assessments evolve with time. Previous iterations of total system performance assessment of the Yucca Mountain site and associated engineered barriers have been conducted in 1991 and 1993

  16. Total system performance assessment - 1995: An evaluation of the potential Yucca Mountain repository

    Energy Technology Data Exchange (ETDEWEB)

    Atkins, J.E.; Lee, J.H.; Lingineni, S.; Mishra, S; McNeish, J.A.; Sassani, D.C.; Sevougian, S.D.

    1995-11-01

    The U.S. Department of Energy (DOE) is currently investigating the feasibility of permanently disposing the nation`s commercial high-level radioactive wastes (in the form of spent fuel from the over 100 electric power-generating nuclear reactors across the U.S.) and a portion of the defense high-level radioactive wastes (currently stored at federal facilities around the country) in the unsaturated tuffaceous rocks at Yucca Mountain, Nevada. Quantitative predictions based on the most current understanding of the processes and parameters potentially affecting the long-term behavior of the disposal system are used to assess the ability of the site and its associated engineered designs to meet regulatory objectives of the US NRC and the US EPA. The evaluation of the ability of the overall system to meet the performance objectives specified in the applicable regulatory standards has been termed total system performance assessment (TSPA). Total system performance assessments require the explicit quantification of the relevant processes and process interactions. In addition assessments are useful to help define the most significant processes, the information gaps and uncertainties and therefore the additional information required for more robust and defensible assessment of the overall performance. The aim of any total system performance assessment is to be as complete and reasonably conservative as possible and to assure that the descriptions of the predictive models and parameters are sufficient to ascertain their accuracy. Total system performance assessments evolve with time. Previous iterations of total system performance assessment of the Yucca Mountain site and associated engineered barriers have been conducted in 1991 and 1993.

  17. Total System Performance Assessment for the Site Recommendation

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-10-02

    As mandated in the Nuclear Waste Policy Act of 1982, the U.S. Department of Energy (DOE) has been investigating a candidate site at Yucca Mountain, Nevada, to determine whether it is suitable for development of the nation's first repository for permanent geologic disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The Nuclear Waste Policy Amendments Act of 1987 directed that only Yucca Mountain be characterized to evaluate the site's suitability. Three main components of the DOE site characterization program are testing, design, and performance assessment. These program components consist of: Investigation of natural features and processes by analyzing data collected from field tests conducted above and below ground and from laboratory tests of rock, gas, and water samples Design of a repository and waste packages tailored to the site features, supported by laboratory testing of candidate materials for waste packages and design related testing in the underground tunnels where waste would be emplaced Quantitative estimates of the performance of the total repository system, over a range of possible conditions and for different repository configurations, by means of computer modeling techniques that are based on site and materials testing data and accepted principles of physics and chemistry. To date, DOE has completed and documented four major iterations of total system performance assessment (TSPA) for the Yucca Mountain site: TSPA-91 (Barnard et al. 1992), TSPA-93 (Wilson et al. 1994; CRWMS M and O 1994), TSPA-95 (CRWMS M and O 1995), and the Total System Performance Assessment-Viability Assessment (TSPA-VA) (DOE 1998a, Volume 3). Each successive TSPA iteration has advanced the technical understanding of the performance attributes of the natural features and processes and enhanced engineering designs. The next major iteration of TSPA is to be conducted in support of the next major programmatic milestone for the DOE, namely the

  18. The grout/glass performance assessment code system (GPACS) with verification and benchmarking

    International Nuclear Information System (INIS)

    Piepho, M.G.; Sutherland, W.H.; Rittmann, P.D.

    1994-12-01

    GPACS is a computer code system for calculating water flow (unsaturated or saturated), solute transport, and human doses due to the slow release of contaminants from a waste form (in particular grout or glass) through an engineered system and through a vadose zone to an aquifer, well and river. This dual-purpose document is intended to serve as a user's guide and verification/benchmark document for the Grout/Glass Performance Assessment Code system (GPACS). GPACS can be used for low-level-waste (LLW) Glass Performance Assessment and many other applications including other low-level-waste performance assessments and risk assessments. Based on all the cses presented, GPACS is adequate (verified) for calculating water flow and contaminant transport in unsaturated-zone sediments and for calculating human doses via the groundwater pathway

  19. Preliminary assessment of adjuster system performance in CANDU-6 RUFIC core

    International Nuclear Information System (INIS)

    Kim, Soon Young; Suk, Ho Chun

    2002-07-01

    Four operational transients in CANDU-6 RUFIC core have been simulated to assess the adjuster system performance. These transients included startup after a short shutdown, startup after a poison-out shutdown, shim mode operation, and a stepback to 60% full power. Also, an alternative adjuster-banking scheme has been assessed in this report. The alternative adjuster-banking scheme involves rods in Bank 1 and Bank 7 being re-distributed within the two banks. In the alternative adjuster-banking scheme, Bank 1 becomes the heaviest one. The results of the preliminary assessment indicated that the adjuster system as currently designed and installed in the NU core will adequately meet the functional requirements in the RUFIC core. Comparing to the adjuster system performance in the NU core, the total worth of the adjuster in the RUFIC core is reduced, leading to less xenon override capability and shimming capability. However, the overall performance is expected to still be satisfactory. The overall results from the transient studied indicated that the alternative banking scheme does show some better performance characteristics and merits further detailed studies

  20. Total System Performance Assessment-License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2002-09-13

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

  1. Total System Performance Assessment: Enhanced Design Alternative V

    International Nuclear Information System (INIS)

    N. Erb; S. Miller; V. Vallikat

    1999-01-01

    This calculation documents the total system performance assessment modeling of Enhanced Design Analysis (EDA) V. EDA V is based on the TSPA-VA base design which has been modified with higher thermal loading, a quartz sand invert, and line loading with 21 PWR waste packages that have 2-cm thick titanium grade 7 corrosion resistance material (CRM) drip shields placed over dual-layer waste packages composed of 'inside out' VA reference material (CRWMS M and O 1999a). This document details the changes and assumptions made to the VA reference Performance Assessment Model (CRWMS M and O 1998a) to incorporate the design changes detailed for EDA V. The performance measure for this evaluation is expected value dose-rate history. Time histories of dose rate are presented for EDA V and a Defense in Depth (DID) analysis base on EDA V. Additional details concerning the Enhanced Design Alternative II are provided in the 'LADS 3-12 Requests' interoffice correspondence (CRWMS M and O 1999a)

  2. Total system performance assessment - 1995: An evaluation of the potential Yucca Mountain Repository

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The U.S. Department of Energy (DOE) is currently investigating the feasibility of permanently disposing the nation`s commercial high-level radioactive wastes (in the form of spent fuel from the over 100 electric power-generating nuclear reactors across the U.S.) and a portion of the defense high-level radioactive wastes (currently stored at federal facilities around the country) in the unsaturated tuffaceous rocks at Yucca Mountain, Nevada. Quantitative predictions based on the most current understanding of the processes and parameters potentially affecting the long-term behavior of the disposal system are used to assess the ability of the site and its associated engineered designs to meet regulatory objectives set forward by the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Environmental Protection Agency (EPA). The evaluation of the ability of the overall system to meet the performance objectives specified in the applicable regulatory standards has been termed total system performance assessment (TSPA). The aim of any total system performance assessment is to be as complete and reasonably conservative as possible and to assure that the descriptions of the predictive models and parameters are sufficient to ascertain their accuracy. Total system performance assessments evolve with time. As additional site and design information is generated, performance assessment analyses can be revised to become more representative of the expected conditions and remove some of the conservative assumptions necessitated by the incompleteness of site and design data. Previous iterations of total system performance assessment of the Yucca Mountain site and associated engineered barriers have been conducted in 1991 and 1993. These analyses have been documented in Barnard, Eslinger, Wilson and Andrews.

  3. Total system performance assessment - 1995: An evaluation of the potential Yucca Mountain Repository

    International Nuclear Information System (INIS)

    1995-11-01

    The U.S. Department of Energy (DOE) is currently investigating the feasibility of permanently disposing the nation's commercial high-level radioactive wastes (in the form of spent fuel from the over 100 electric power-generating nuclear reactors across the U.S.) and a portion of the defense high-level radioactive wastes (currently stored at federal facilities around the country) in the unsaturated tuffaceous rocks at Yucca Mountain, Nevada. Quantitative predictions based on the most current understanding of the processes and parameters potentially affecting the long-term behavior of the disposal system are used to assess the ability of the site and its associated engineered designs to meet regulatory objectives set forward by the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Environmental Protection Agency (EPA). The evaluation of the ability of the overall system to meet the performance objectives specified in the applicable regulatory standards has been termed total system performance assessment (TSPA). The aim of any total system performance assessment is to be as complete and reasonably conservative as possible and to assure that the descriptions of the predictive models and parameters are sufficient to ascertain their accuracy. Total system performance assessments evolve with time. As additional site and design information is generated, performance assessment analyses can be revised to become more representative of the expected conditions and remove some of the conservative assumptions necessitated by the incompleteness of site and design data. Previous iterations of total system performance assessment of the Yucca Mountain site and associated engineered barriers have been conducted in 1991 and 1993. These analyses have been documented in Barnard, Eslinger, Wilson and Andrews

  4. Total System Performance Assessment - License Application Methods and Approach

    International Nuclear Information System (INIS)

    McNeish, J.

    2003-01-01

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document

  5. A resistive mesh phantom for assessing the performance of EIT systems.

    Science.gov (United States)

    Gagnon, Hervé; Cousineau, Martin; Adler, Andy; Hartinger, Alzbeta E

    2010-09-01

    Assessing the performance of electrical impedance tomography (EIT) systems usually requires a phantom for validation, calibration, or comparison purposes. This paper describes a resistive mesh phantom to assess the performance of EIT systems while taking into account cabling stray effects similar to in vivo conditions. This phantom is built with 340 precision resistors on a printed circuit board representing a 2-D circular homogeneous medium. It also integrates equivalent electrical models of the Ag/AgCl electrode impedances. The parameters of the electrode models were fitted from impedance curves measured with an impedance analyzer. The technique used to build the phantom is general and applicable to phantoms of arbitrary shape and conductivity distribution. We describe three performance indicators that can be measured with our phantom for every measurement of an EIT data frame: SNR, accuracy, and modeling accuracy. These performance indicators were evaluated on our EIT system under different frame rates and applied current intensities. The performance indicators are dependent on frame rate, operating frequency, applied current intensity, measurement strategy, and intermodulation distortion when performing simultaneous measurements at several frequencies. These parameter values should, therefore, always be specified when reporting performance indicators to better appreciate their significance.

  6. Practical application of the KMS: 1) total system performance assessment - 16349

    International Nuclear Information System (INIS)

    Makino, Hitoshi; Hioki, Kazumasa; Umeki, Hiroyuki; Yang, Hongzhi; Takase, Hiroyasu; McKinley, Ian

    2009-01-01

    Comprehensive total system performance assessment (PA) is a key component of the safety case. Within this PA there are a number of tasks that reuse specific models and datasets, together with associated knowledge base for the disposal system considered. These are tasks where recent developments in the Knowledge Management System by Japan Atomic Energy Agency (JAEA KMS) can lead to optimisation of procedures. This paper will outline the reformulation of PA as a Knowledge Management (KM) task, discuss application of KM technologies to PA tasks, and illustrate how these can be handled electronically in a 'Performance assessment All-In-one Report System (PAIRS)' utilising hyper-links and embedded tools to minimise duplication of material, ease Quality Assurance (QA) and facilitate the regular updating required in the Japanese programme. (authors)

  7. Total System Performance Assessment - License Application Methods and Approach

    Energy Technology Data Exchange (ETDEWEB)

    J. McNeish

    2003-12-08

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

  8. Total System Performance Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Yong Soo; Kang, Chul Hyung; Lee, Youn Myoung; Han, Ji Woong; Choi, Jong Won; Hahn, Pil Soo; Park, Jeong Hwa; Jeong, Mi Seon

    2007-06-15

    Based on the KAERI FEP list developed through the previous studies, the KAERI FEP Encyclopedia has been developed. Current version is 1.0 which includes all relevant FEPs to compose of two references and all alternative scenarios. Many interaction FEPs between scenario defining FEP(SDF) are created throughout the study. FEPs are classified into many Integrated FEP(IFEP) which eventually become the elements of the RES matrix. The FEAS program one of the component of the KAERI's CYPRUS information system is added to develop the FEP, RES, AC, AMF and finally scenarios. It assists to create transparent way to deal with assessment from the stage of the planning of the R and D to the final stage of the external audit and regulatory body review. Even though MASCOT-K and compartment analysis codes such as AMBER, GoldSim and Ecolego are excellent for TSPA they by in heritage possess a certain limitation especially to identify a proper migration cross sectional area when a relatively big component intersects with a tiny one such as a fracture. It is truly 3D phenomena in nature. MDPSA code is developed which is expected to overcome limitations in compartment models while successfully deals with natural disruptive events. The R and D target for the TSPA is to develop the sufficient scenarios and their variation cases to understand the safety of KRS in every possible aspect. For this, reference scenarios, alternative scenarios covering engineered barrier failure and natural events are developed and assessed respectively for around 100 cases. The stylized template to assess the Korean reference biosphere is developed using the AMBER. Three critical groups, agricultural, freshwater and marine water fishing groups are identified to assess the DCF following the guidelines of ICRP. Based on the QA principles of T2R3, the web based QA system is developed using the procedures in the USNRC 10CFR50 Appendix B. The QA system is combined with the PAID and FEAS to create the comprehensive

  9. Total System Performance Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Yong Soo; Kang, Chul Hyung; Lee, Youn Myoung; Han, Ji Woong; Choi, Jong Won; Hahn, Pil Soo; Park, Jeong Hwa; Jeong, Mi Seon

    2007-06-15

    Based on the KAERI FEP list developed through the previous studies, the KAERI FEP Encyclopedia has been developed. Current version is 1.0 which includes all relevant FEPs to compose of two references and all alternative scenarios. Many interaction FEPs between scenario defining FEP(SDF) are created throughout the study. FEPs are classified into many Integrated FEP(IFEP) which eventually become the elements of the RES matrix. The FEAS program one of the component of the KAERI's CYPRUS information system is added to develop the FEP, RES, AC, AMF and finally scenarios. It assists to create transparent way to deal with assessment from the stage of the planning of the R and D to the final stage of the external audit and regulatory body review. Even though MASCOT-K and compartment analysis codes such as AMBER, GoldSim and Ecolego are excellent for TSPA they by in heritage possess a certain limitation especially to identify a proper migration cross sectional area when a relatively big component intersects with a tiny one such as a fracture. It is truly 3D phenomena in nature. MDPSA code is developed which is expected to overcome limitations in compartment models while successfully deals with natural disruptive events. The R and D target for the TSPA is to develop the sufficient scenarios and their variation cases to understand the safety of KRS in every possible aspect. For this, reference scenarios, alternative scenarios covering engineered barrier failure and natural events are developed and assessed respectively for around 100 cases. The stylized template to assess the Korean reference biosphere is developed using the AMBER. Three critical groups, agricultural, freshwater and marine water fishing groups are identified to assess the DCF following the guidelines of ICRP. Based on the QA principles of T2R3, the web based QA system is developed using the procedures in the USNRC 10CFR50 Appendix B. The QA system is combined with the PAID and FEAS to create the

  10. Total System Performance Assessment

    International Nuclear Information System (INIS)

    Hwang, Yong Soo; Kang, Chul Hyung; Lee, Youn Myoung; Han, Ji Woong; Choi, Jong Won; Hahn, Pil Soo; Park, Jeong Hwa; Jeong, Mi Seon

    2007-06-01

    Based on the KAERI FEP list developed through the previous studies, the KAERI FEP Encyclopedia has been developed. Current version is 1.0 which includes all relevant FEPs to compose of two references and all alternative scenarios. Many interaction FEPs between scenario defining FEP(SDF) are created throughout the study. FEPs are classified into many Integrated FEP(IFEP) which eventually become the elements of the RES matrix. The FEAS program one of the component of the KAERI's CYPRUS information system is added to develop the FEP, RES, AC, AMF and finally scenarios. It assists to create transparent way to deal with assessment from the stage of the planning of the R and D to the final stage of the external audit and regulatory body review. Even though MASCOT-K and compartment analysis codes such as AMBER, GoldSim and Ecolego are excellent for TSPA they by in heritage possess a certain limitation especially to identify a proper migration cross sectional area when a relatively big component intersects with a tiny one such as a fracture. It is truly 3D phenomena in nature. MDPSA code is developed which is expected to overcome limitations in compartment models while successfully deals with natural disruptive events. The R and D target for the TSPA is to develop the sufficient scenarios and their variation cases to understand the safety of KRS in every possible aspect. For this, reference scenarios, alternative scenarios covering engineered barrier failure and natural events are developed and assessed respectively for around 100 cases. The stylized template to assess the Korean reference biosphere is developed using the AMBER. Three critical groups, agricultural, freshwater and marine water fishing groups are identified to assess the DCF following the guidelines of ICRP. Based on the QA principles of T2R3, the web based QA system is developed using the procedures in the USNRC 10CFR50 Appendix B. The QA system is combined with the PAID and FEAS to create the comprehensive

  11. Operational Modal Analysis and the Performance Assessment of Vehicle Suspension Systems

    Directory of Open Access Journals (Sweden)

    L. Soria

    2012-01-01

    Full Text Available Comfort, road holding and safety of passenger cars are mainly influenced by an appropriate design of suspension systems. Improvements of the dynamic behaviour can be achieved by implementing semi-active or active suspension systems. In these cases, the correct design of a well-performing suspension control strategy is of fundamental importance to obtain satisfying results. Operational Modal Analysis allows the experimental structural identification in those that are the real operating conditions: Moving from output-only data, leading to modal models linearised around the more interesting working points and, in the case of controlled systems, providing the needed information for the optimal design and verification of the controller performance. All these characters are needed for the experimental assessment of vehicle suspension systems. In the paper two suspension architectures are considered equipping the same car type. The former is a semi-active commercial system, the latter a novel prototypic active system. For the assessment of suspension performance, two different kinds of tests have been considered, proving ground tests on different road profiles and laboratory four poster rig tests. By OMA-processing the signals acquired in the different testing conditions and by comparing the results, it is shown how this tool can be effectively utilised to verify the operation and the performance of those systems, by only carrying out a simple, cost-effective road test.

  12. Non-Gaussian Systems Control Performance Assessment Based on Rational Entropy

    Directory of Open Access Journals (Sweden)

    Jinglin Zhou

    2018-05-01

    Full Text Available Control loop Performance Assessment (CPA plays an important role in system operations. Stochastic statistical CPA index, such as a minimum variance controller (MVC-based CPA index, is one of the most widely used CPA indices. In this paper, a new minimum entropy controller (MEC-based CPA method of linear non-Gaussian systems is proposed. In this method, probability density function (PDF and rational entropy (RE are respectively used to describe the characteristics and the uncertainty of random variables. To better estimate the performance benchmark, an improved EDA algorithm, which is used to estimate the system parameters and noise PDF, is given. The effectiveness of the proposed method is illustrated through case studies on an ARMAX system.

  13. Biosphere Modeling and Analyses in Support of Total System Performance Assessment

    International Nuclear Information System (INIS)

    Tappen, J. J.; Wasiolek, M. A.; Wu, D. W.; Schmitt, J. F.; Smith, A. J.

    2002-01-01

    The Nuclear Waste Policy Act of 1982 established the obligations of and the relationship between the U.S. Environmental Protection Agency (EPA), the U.S. Nuclear Regulatory Commission (NRC), and the U.S. Department of Energy (DOE) for the management and disposal of high-level radioactive wastes. In 1985, the EPA promulgated regulations that included a definition of performance assessment that did not consider potential dose to a member of the general public. This definition would influence the scope of activities conducted by DOE in support of the total system performance assessment program until 1995. The release of a National Academy of Sciences (NAS) report on the technical basis for a Yucca Mountain-specific standard provided the impetus for the DOE to initiate activities that would consider the attributes of the biosphere, i.e. that portion of the earth where living things, including man, exist and interact with the environment around them. The evolution of NRC and EPA Yucca Mountain-specific regulations, originally proposed in 1999, was critical to the development and integration of biosphere modeling and analyses into the total system performance assessment program. These proposed regulations initially differed in the conceptual representation of the receptor of interest to be considered in assessing performance. The publication in 2001 of final regulations in which the NRC adopted standard will permit the continued improvement and refinement of biosphere modeling and analyses activities in support of assessment activities

  14. Biosphere Modeling and Analyses in Support of Total System Performance Assessment

    International Nuclear Information System (INIS)

    Jeff Tappen; M.A. Wasiolek; D.W. Wu; J.F. Schmitt

    2001-01-01

    The Nuclear Waste Policy Act of 1982 established the obligations of and the relationship between the U.S. Environmental Protection Agency (EPA), the U.S. Nuclear Regulatory Commission (NRC), and the U.S. Department of Energy (DOE) for the management and disposal of high-level radioactive wastes. In 1985, the EPA promulgated regulations that included a definition of performance assessment that did not consider potential dose to a member of the general public. This definition would influence the scope of activities conducted by DOE in support of the total system performance assessment program until 1995. The release of a National Academy of Sciences (NAS) report on the technical basis for a Yucca Mountain-specific standard provided the impetus for the DOE to initiate activities that would consider the attributes of the biosphere, i.e. that portion of the earth where living things, including man, exist and interact with the environment around them. The evolution of NRC and EPA Yucca Mountain-specific regulations, originally proposed in 1999, was critical to the development and integration of biosphere modeling and analyses into the total system performance assessment program. These proposed regulations initially differed in the conceptual representation of the receptor of interest to be considered in assessing performance. The publication in 2001 of final regulations in which the NRC adopted standard will permit the continued improvement and refinement of biosphere modeling and analyses activities in support of assessment activities

  15. The foundations of the HMIP system simulation approach to performance assessment

    International Nuclear Information System (INIS)

    Thompson, B.G.J.; Grindrod, P.

    1995-01-01

    Her Majesty's Inspectorate of Polution (HMIP) of the United Kingdom has developed a procedure for the post closure assessment of the underground disposal of radioactive waste. In this paper the method of using theory and ideas from the mathematical sciences for assessment is described. The system simulation methodology seeks to discover key combinations of processes or effects which may yield behaviour of interest by sampling across functional and parametric uncertainties, and treating the systems within a probabilistic framework. This paper also discusses how HMIP assessment methodology has been presented, independent of any current application, for review by leading scientists who are independent of the performance assessment field

  16. Enhanced Performance Assessment System (EPAS) for carbon sequestration.

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Yifeng; Sun, Amy Cha-Tien; McNeish, Jerry A. (Sandia National Laboratories, Livermore, CA); Dewers, Thomas A.; Hadgu, Teklu; Jove-Colon, Carlos F.

    2010-09-01

    Carbon capture and sequestration (CCS) is an option to mitigate impacts of atmospheric carbon emission. Numerous factors are important in determining the overall effectiveness of long-term geologic storage of carbon, including leakage rates, volume of storage available, and system costs. Recent efforts have been made to apply an existing probabilistic performance assessment (PA) methodology developed for deep nuclear waste geologic repositories to evaluate the effectiveness of subsurface carbon storage (Viswanathan et al., 2008; Stauffer et al., 2009). However, to address the most pressing management, regulatory, and scientific concerns with subsurface carbon storage (CS), the existing PA methodology and tools must be enhanced and upgraded. For example, in the evaluation of a nuclear waste repository, a PA model is essentially a forward model that samples input parameters and runs multiple realizations to estimate future consequences and determine important parameters driving the system performance. In the CS evaluation, however, a PA model must be able to run both forward and inverse calculations to support optimization of CO{sub 2} injection and real-time site monitoring as an integral part of the system design and operation. The monitoring data must be continually fused into the PA model through model inversion and parameter estimation. Model calculations will in turn guide the design of optimal monitoring and carbon-injection strategies (e.g., in terms of monitoring techniques, locations, and time intervals). Under the support of Laboratory-Directed Research & Development (LDRD), a late-start LDRD project was initiated in June of Fiscal Year 2010 to explore the concept of an enhanced performance assessment system (EPAS) for carbon sequestration and storage. In spite of the tight time constraints, significant progress has been made on the project: (1) Following the general PA methodology, a preliminary Feature, Event, and Process (FEP) analysis was performed for

  17. Probabilistic performance assessment of complex energy process systems - The case of a self-sustained sanitation system.

    Science.gov (United States)

    Kolios, Athanasios; Jiang, Ying; Somorin, Tosin; Sowale, Ayodeji; Anastasopoulou, Aikaterini; Anthony, Edward J; Fidalgo, Beatriz; Parker, Alison; McAdam, Ewan; Williams, Leon; Collins, Matt; Tyrrel, Sean

    2018-05-01

    A probabilistic modelling approach was developed and applied to investigate the energy and environmental performance of an innovative sanitation system, the "Nano-membrane Toilet" (NMT). The system treats human excreta via an advanced energy and water recovery island with the aim of addressing current and future sanitation demands. Due to the complex design and inherent characteristics of the system's input material, there are a number of stochastic variables which may significantly affect the system's performance. The non-intrusive probabilistic approach adopted in this study combines a finite number of deterministic thermodynamic process simulations with an artificial neural network (ANN) approximation model and Monte Carlo simulations (MCS) to assess the effect of system uncertainties on the predicted performance of the NMT system. The joint probability distributions of the process performance indicators suggest a Stirling Engine (SE) power output in the range of 61.5-73 W with a high confidence interval (CI) of 95%. In addition, there is high probability (with 95% CI) that the NMT system can achieve positive net power output between 15.8 and 35 W. A sensitivity study reveals the system power performance is mostly affected by SE heater temperature. Investigation into the environmental performance of the NMT design, including water recovery and CO 2 /NO x emissions, suggests significant environmental benefits compared to conventional systems. Results of the probabilistic analysis can better inform future improvements on the system design and operational strategy and this probabilistic assessment framework can also be applied to similar complex engineering systems.

  18. Total System Performance Assessment, 1993: An evaluation of the potential Yucca Mountain repository

    International Nuclear Information System (INIS)

    Andrews, R.W.; Dale, T.F.; McNeish, J.A.

    1994-03-01

    Total System Performance Assessments are an important component in the evaluation of the suitability of Yucca Mountain, Nevada as a potential site for a mined geologic repository for the permanent disposal of high-level radioactive wastes in the United States. The Total System Performance Assessments are conducted iteratively during site characterization to identify issues which should be addressed by the characterization and design activities as well as providing input to regulatory/licensing and programmatic decisions. During fiscal years 1991 and 1992, the first iteration of Total System Performance Assessment (hereafter referred to as TSPA 1991) was completed by Sandia National Laboratories and Pacific Northwest Laboratory. Beginning in fiscal year 1993, the Civilian Radioactive Waste Management System Management and Operating Contractor was assigned the responsibility to plan, coordinate, and contribute to the second iteration of Total System Performance Assessment (hereafter referred to as TSPA 1993). This document presents the objectives, approach, assumptions, input, results, conclusions, and recommendations associated with the Management and Operating Contractor contribution to TSPA 1993. The new information incorporated in TSPA 1993 includes (1) revised estimates of radionuclide solubilities (and their thermal and geochemical dependency), (2) thermal and geochemical dependency of spent fuel waste alteration and glass dissolution rates, (3) new distribution coefficient (k d ) estimates, (4) revised estimates of gas-phase velocities and travel times, and (5) revised hydrologic modeling of the saturated zone which provides updated estimates of the advective flux through the saturated zone

  19. Total System Performance Assessment, 1993: An evaluation of the potential Yucca Mountain repository

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, R.W.; Dale, T.F.; McNeish, J.A.

    1994-03-01

    Total System Performance Assessments are an important component in the evaluation of the suitability of Yucca Mountain, Nevada as a potential site for a mined geologic repository for the permanent disposal of high-level radioactive wastes in the United States. The Total System Performance Assessments are conducted iteratively during site characterization to identify issues which should be addressed by the characterization and design activities as well as providing input to regulatory/licensing and programmatic decisions. During fiscal years 1991 and 1992, the first iteration of Total System Performance Assessment (hereafter referred to as TSPA 1991) was completed by Sandia National Laboratories and Pacific Northwest Laboratory. Beginning in fiscal year 1993, the Civilian Radioactive Waste Management System Management and Operating Contractor was assigned the responsibility to plan, coordinate, and contribute to the second iteration of Total System Performance Assessment (hereafter referred to as TSPA 1993). This document presents the objectives, approach, assumptions, input, results, conclusions, and recommendations associated with the Management and Operating Contractor contribution to TSPA 1993. The new information incorporated in TSPA 1993 includes (1) revised estimates of radionuclide solubilities (and their thermal and geochemical dependency), (2) thermal and geochemical dependency of spent fuel waste alteration and glass dissolution rates, (3) new distribution coefficient (k{sub d}) estimates, (4) revised estimates of gas-phase velocities and travel times, and (5) revised hydrologic modeling of the saturated zone which provides updated estimates of the advective flux through the saturated zone.

  20. Contractor Performance Assessment Reporting System

    Data.gov (United States)

    US Agency for International Development — CPARS is a web-based system used to input data on contractor performance. Reports from the system are used as an aid in awarding contracts to contractors that...

  1. High Pressure Water Jet System Performance Assessment Project A-2A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    1999-01-01

    Performance assessment for canister cleaning system in the KE Basin. Information obtained from this assessment will be used to design any additional equipment used to clean canisters. After thorough review of the design, maintenance history and operational characteristics of the 105 K East (KE) canister cleaning system, Bartlett recommends that the high pressure water jet system (HPWJS) be modified as outlined in section 5.0, and retained for future use. Further, it is recommended that Spent Nuclear Fuel (SNF) Project consider use of a graded approach for canister cleaning, based on individual canister type and characteristics. This approach would allow a simple method to be used on canisters not needing the more rigorous, high-pressure method. Justification is provided in section 5.0. Although Bartlett has provided some preliminary cost estimates, it is recommended that SNF Project perform a detailed cost-benefit analysis to weigh the alternatives presented

  2. The study on the quality assurance of performance assessment for the disposal system

    International Nuclear Information System (INIS)

    Fusaeda, Shigeki; Yanagisawa, Ichiro; Katsurai, Kiyomichi; Ueda, Noriaki; Takeishi, Masayuki; Ida, Toshio; Imamura, Naoko

    1999-02-01

    The purpose of performance assessment of the geological disposal system in the second progress report is to quantitatively evaluate the performance in the near-field. For this purpose, validation of performance models and quality assurance of data used in the performance assessment are important technical subjects. To achieve the subjects, the quality of the procedure of analysis work and data acquisition work must be assured in addition to the quality assurance of data, models and analysis codes. In addition, to assure results of the performance assessment by integrating these qualities is an important matter. The following studies have been performed in order to improve the computer environment for controlling the quality information relating to the performance assessment, and to develop the integrated quality assurance system which can give reliability of the results of the performance assessment in the second progress report. (1) The study of quality assurance framework. In order to assure reliability of MESHNOTE3, we have carried out validation analysis based on experimental data and insite data. And we have revised the quality assurance manual in order to be applicable to preparing documents. We have carried out validation analysis/planning based on the experimental data which is acquired from 'Measurement of Apparent Diffusion Coefficient of 99 Tc in Compacted Bentonite with Fe powder', and confirmed validity of MESHNOTE3. We have added a postscript on the management of analysis documents to the quality assurance manual. (2) The development of the quality assurance computer system. In order to improve reliability of the analysis results and to efficiently use the quality assurance program, the quality assurance computer system on the basis of analysis management system CAPASA has been improved as follows. Database for radionuclide transport calculations that can control geometry of engineered barriers, data relating to glass dissolution and dose rate

  3. Geotechnical Issues in Total System Performance Assessments of Yucca Mountain

    International Nuclear Information System (INIS)

    HO, CLIFFORD K.; HOUSEWORTH, JIM; WILSON, MICHAEL L.

    1999-01-01

    A Total System Performance Assessment (TSPA) of Yucca Mountain consists of integrated sub-models and analyses of natural and engineered systems. Examples of subsystem models include unsaturated-zone flow and transport, seepage into drifts, coupled thermal hydrologic processes, transport through the engineered barrier system, and saturated-zone flow and transport. The TSPA evaluates the interaction of important processes among these subsystems, and it determines the impact of these processes on the overall performance measures (e.g., dose rate to humans). This paper summarizes the evaluation, abstraction, and combination of these subsystem models in a TSPA calculation, and it provides background on the individual TSPA subsystem components that are most directly impacted by geotechnical issues. The potential impact that geologic features, events, and processes have on the overall performance is presented, and an evaluation of the sensitivity of TSPA calculations to these issues is also provided

  4. Process of performance assessment

    International Nuclear Information System (INIS)

    King, C.M.; Halford, D.K.

    1987-01-01

    Performance assessment is the process used to evaluate the environmental consequences of disposal of radioactive waste in the biosphere. An introductory review of the subject is presented. Emphasis is placed on the process of performance assessment from the standpoint of defining the process. Performance assessment, from evolving experience at DOE sites, has short-term and long-term subprograms, the components of which are discussed. The role of mathematical modeling in performance assessment is addressed including the pros and cons of current approaches. Finally, the system/site/technology issues as the focal point of this symposium are reviewed

  5. Operational Performance Risk Assessment in Support of A Supervisory Control System

    Energy Technology Data Exchange (ETDEWEB)

    Denning, Richard S. [Self Employed; Muhlheim, Michael David [ORNL; Cetiner, Sacit M. [ORNL; Guler Yigitoglu, Askin [ORNL

    2017-06-01

    Supervisory control system (SCS) is developed for multi-unit advanced small modular reactors to minimize human interventions in both normal and abnormal operations. In SCS, control action decisions made based on probabilistic risk assessment approach via Event Trees/Fault Trees. Although traditional PRA tools are implemented, their scope is extended to normal operations and application is reversed; success of non-safety related system instead failure of safety systems this extended PRA approach called as operational performance risk assessment (OPRA). OPRA helps to identify success paths, combination of control actions for transients and to quantify these success paths to provide possible actions without activating plant protection system. In this paper, a case study of the OPRA in supervisory control system is demonstrated within the context of the ALMR PRISM design, specifically power conversion system. The scenario investigated involved a condition that the feed water control valve is observed to be drifting to the closed position. Alternative plant configurations were identified via OPRA that would allow the plant to continue to operate at full or reduced power. Dynamic analyses were performed with a thermal-hydraulic model of the ALMR PRISM system using Modelica to evaluate remained safety margins. Successful recovery paths for the selected scenario are identified and quantified via SCS.

  6. Lawrence Livermore National Laboratory low-level waste systems performance assessment

    International Nuclear Information System (INIS)

    1990-11-01

    This Low-Level Radioactive Waste (LLW) Systems Performance Assessment (PA) presents a systematic analysis of the potential risks posed by the Lawrence Livermore National Laboratory (LLNL) waste management system. Potential risks to the public and environment are compared to established performance objectives as required by DOE Order 5820.2A. The report determines the associated maximum individual committed effective dose equivalent (CEDE) to a member of the public from LLW and mixed waste. A maximum annual CEDE of 0.01 mrem could result from routine radioactive liquid effluents. A maximum annual CEDE of 0.003 mrem could result from routine radioactive gaseous effluents. No other pathways for radiation exposure of the public indicated detectable levels of exposure. The dose rate, monitoring, and waste acceptance performance objectives were found to be adequately addressed by the LLNL Program. 88 refs., 3 figs., 17 tabs

  7. Performance Assessment and Active System Monitoring for Refrigeration Systems

    DEFF Research Database (Denmark)

    Green, Torben

    to the refrigeration system, is to optimise the total cost of ownership, (TCO). However, directly measuring TCO provides some challenges. It can therefore be beneficial to divide TCO into performance criteria, which can be quantied and measured. For supermarket refrigeration systems the performance criteria can...... is measure by the switch frequency of the compressors in the refrigeration system. The reason is that excessive compressor switching will wear down the compressors too fast and thereby decrease the reliability of the system due to a higher demand for maintenance. The proposed performance function provides...

  8. SUMO, System performance assessment for a high-level nuclear waste repository: Mathematical models

    International Nuclear Information System (INIS)

    Eslinger, P.W.; Miley, T.B.; Engel, D.W.; Chamberlain, P.J. II.

    1992-09-01

    Following completion of the preliminary risk assessment of the potential Yucca Mountain Site by Pacific Northwest Laboratory (PNL) in 1988, the Office of Civilian Radioactive Waste Management (OCRWM) of the US Department of Energy (DOE) requested the Performance Assessment Scientific Support (PASS) Program at PNL to develop an integrated system model and computer code that provides performance and risk assessment analysis capabilities for a potential high-level nuclear waste repository. The system model that has been developed addresses the cumulative radionuclide release criteria established by the US Environmental Protection Agency (EPA) and estimates population risks in terms of dose to humans. The system model embodied in the SUMO (System Unsaturated Model) code will also allow benchmarking of other models being developed for the Yucca Mountain Project. The system model has three natural divisions: (1) source term, (2) far-field transport, and (3) dose to humans. This document gives a detailed description of the mathematics of each of these three divisions. Each of the governing equations employed is based on modeling assumptions that are widely accepted within the scientific community

  9. A framework for the quantitative assessment of performance-based system resilience

    International Nuclear Information System (INIS)

    Tran, Huy T.; Balchanos, Michael; Domerçant, Jean Charles; Mavris, Dimitri N.

    2017-01-01

    Increasing system complexity and threat uncertainty require the consideration of resilience in the design and analysis of engineered systems. While the resilience engineering community has begun to converge on a definition and set of characteristics for resilience, methods for quantifying the concept are still limited in their applicability to system designers. This paper proposes a framework for assessing resilience that focuses on the ability of a system to absorb disruptions, recover from them, and adapt over time. The framework extends current approaches by explicitly considering temporal aspects of system responses to disruptions, volatility in system performance data, and the possibility of multiple disruption events. Notional system performance data is generated using the logistic function, providing an experimental platform for a parametric comparison of the proposed resilience metric with an integration-based metric. An information exchange network model is used to demonstrate the applicability of the framework towards system design tradeoff studies using stochastic simulations. The presented framework is domain-agnostic and flexible, such that it can be applied to a variety of systems and adjusted to focus on specific aspects of resilience. - Highlights: • We propose a quantitative framework and metrics for assessing system resilience. • Metrics focus on absorption, recovery, and adaptation to disruptions. • The framework accepts volatile data and is easily automated for simulation studies. • The framework is applied to a model of adaptive information exchange networks. • Results show benefits of network adaptation against random and targeted threats.

  10. Performance Assessment National Review Group

    International Nuclear Information System (INIS)

    Lieberman, J.A.; Davis, S.N.; Harleman, D.R.F.

    1985-02-01

    Performance assessment involves predicting the potential radiological impact of a nuclear waste disposal system, taking into account all of the natural and engineered components of the system. It includes the analysis and evaluation of predicted system and component performance to determine compliance with regulatory performance criteria. In the context of the nuclear waste management program, performance assessment has five major purposes: to assist in the evaluation and selection of repository sites; to guide the research, development, and testing programs; to assist in the evaluation of repository designs; to assist in the evaluation of the design and performance of engineered barriers; and to show regulatory compliance and support repository licensing. Current performance assessment methodologies are still in the developmental stage. Only the simplest of bounding calculations have produced quantitative predictions of radionuclide releases. The methodologies require considerable extension and validation before they can provide answers suitable for project decisions and licensing. 135 refs., 9 figs., 1 tab

  11. Study on Thermal Performance Assessment of Solar Hot Water Systems in Malaysia

    Directory of Open Access Journals (Sweden)

    Sulaiman Shaharin Anwar

    2014-07-01

    Full Text Available Solar Hot Water Systems (SHWS are gaining popularity in Malaysia due to increasing cost of electricity and also awareness of environmental issues related to the use of fossil fuels. The introduction of solar hot water systems in Malaysia is an indication that it has potential market. However, there is a need for a proper methodology for rating the energy performance of these systems. The main objective of this study is to assess the thermal performance of several SHWS subject to four different locations in Malaysia using combined direct measurement and computer modelling using the TRNSYS simulation program. The results showed distinct differences in performance of the systems as a result of locations and manufacturers. The findings could be used further in developing an acceptable rating system for SHWS in Malaysia.

  12. Approach to geologic repository post closure system performance assessment

    International Nuclear Information System (INIS)

    Pahwa, S.B.; Felton, W.; Duguid, J.O.

    1992-01-01

    An essential part of the license application for a geologic repository will be the demonstration of compliance with the standards set by the Environmental Protection Agency. The performance assessments that produce the demonstration must rely on models of various levels of detail. The most detailed of these models are needed for understanding thoroughly the complex physical and chemical processes affecting the behavior of the system. For studying the behavior of major components of the system, less detailed models are often useful. For predicting the behavior of the total system, models of a third kind may be needed. These models must cover all the important processes that contribute to the behavior of the system, because they must estimate the behavior under all significant conditions for 10,000 years. In addition, however, computer codes that embody these models must calculate very rapidly because of the EPA standard's requirement for probabilistic estimates, which will be produced by sampling thousands of times from probability distributions of parameters. For this reason, the total-system models must be less complex than the detailed-process and subsystem models. The total-system performance is evaluated through modeling of the following components: Radionuclide release from the engineered-barrier system. Fluid flow in the geologic units. Radionuclide transport to the accessible environment. Radionuclide release to the accessible environment and dose to man

  13. Performance assessment of a micro-cogeneration system under realistic operating conditions

    International Nuclear Information System (INIS)

    Rosato, Antonio; Sibilio, Sergio

    2013-01-01

    Highlights: • Performances of a micro-cogeneration system have been experimentally evaluated. • Cogenerator performances have been compared with those of a traditional system. • Measured data have been analyzed from both energy and exergy points of view. - Abstract: The European Parliament stated that high-efficiency cogeneration is a Community priority given the potential benefits of cogeneration with regard to saving primary energy and reducing emissions. According to this position, the performance of many micro-cogeneration systems have been assessed from an energy and environmental point of view. However, in the most part of cases, the assessments have been performed by using technical data from manufacturers and/or experimental results measured during steady-state operation, without considering the inefficiencies related to the transient periods; in addition, few works have been devoted to analyze the system operation from an exergy-based point of view. In this paper the electric load-following operation of an internal combustion engine based micro-cogeneration unit with 6.0 kW as nominal electric output has been experimentally investigated in electric load-following operation during a 24 h dynamic test with the application of a realistic daily load profile representing the Italian domestic non-HVAC electric demand for a multi-family house of five dwellings. The measured data have been compared with those that would be associated with servicing the building with electricity from the central electric grid and heat from a natural gas fired boiler from an energy, exergy and environmental points of view

  14. The process of performance assessment

    International Nuclear Information System (INIS)

    King, C.M.; Halford, D.K.

    1986-01-01

    An introductory review of the subject of ''Performance Assessment'' will be presented. Emphasis will be placed on the process of performance assessment from the standpoint of defining the process. Performance assessment, from evolving experience at DOE sites, has short-term and long-term subprograms, the components of which will be discussed. The role of mathematical modeling in performance assessment will be addressed including the pros and cons of current approaches. Finally, the ''system/site/technology'' issues as the focal point of this symposium will be reviewed

  15. Transparency of the Total System Performance Assessment through the Development of the FEAS Program

    International Nuclear Information System (INIS)

    Hwang, Y.S.; Seo, E.J.; Kang, C.H.

    2003-01-01

    Transparency on the total system performance assessment (TSPA) is the key issue to enhance the public acceptance for a permanent high level radioactive repository. Throughout the lessons accumulated in international projects, it turns out to be important to translate technical languages to more understandable ones. One of the key consolidated statements of the RISCOM project was 'the public should know you have a model, which is clear to everybody about value judgments, facts, uncertainties and questions'. In fact, the final assessment is the integration of identifying and clarifying facts, expert judgment, uncertainties, value judgment, level of significance, and open questions, which cannot be easily understood. Traditionally, the study on features, events, and processes (FEPs) and associated scenarios has been regarded as the starting point to open the communicative discussion on TSPA such as what to evaluate, how to evaluate and how to translate outcomes into more friendly language that many stakeholders can easily understand and react with. However, in most cases, it is difficult for stakeholders outside the performance assessment field to assess the details on the story of the safety assessment; scenario and technical background of it. Fortunately, the advent of the internet era opens up the possibility of two way communication from the beginning of the performance assessment so that every stake bolder can exchange their keen opinions on the safety issues. To achieve it, KAERI develops the systematic approach from the FEPs to Assessment method flow chart, through the formation of integrated FEPs corresponding to the elements in the RES matrix. All information is integrated into the web based program named FEAS (FEp to Assessment through Scenario development) under development in KAERI. In parallel, two independent systems are also under development, the web based quality assurance system and the performance assessment input database. Throughout the next phase

  16. Performance Assessment Modeling and Sensitivity Analyses of Generic Disposal System Concepts.

    Energy Technology Data Exchange (ETDEWEB)

    Sevougian, S. David; Freeze, Geoffrey A.; Gardner, William Payton; Hammond, Glenn Edward; Mariner, Paul

    2014-09-01

    directly, rather than through simplified abstractions. It also a llows for complex representations of the source term, e.g., the explicit representation of many individual waste packages (i.e., meter - scale detail of an entire waste emplacement drift). This report fulfills the Generic Disposal System Analysis Work Packa ge Level 3 Milestone - Performance Assessment Modeling and Sensitivity Analyses of Generic Disposal System Concepts (M 3 FT - 1 4 SN08080 3 2 ).

  17. Safety and performance assessment of geologic disposal systems for nuclear wastes

    International Nuclear Information System (INIS)

    Peltonen, E.

    1987-01-01

    This thesis presents a methodology for the safety and performance assesment of final disposal of nuclear wastes into crystalline bedrock. The applicability of radiation protection objectives is discussed, as well as the goals of the assessment in the various repository system development phases. Due consideration is given to the description of the pertinent analysis methods and to the comprehensive model system. The methodology has been applied to assess the acceptability of the basic disposal concepts and to study the possibilities for the optimization of protection. Furthermore, performance of different components in the multiple barrier disposal systems is estimated. The waste types dealt with are low- and intermediate-level waste as well as high-level spent nuclear fuel from a nuclear power plant. In addition, an option of high-level vitrified waste from reprocessing of spent fuel is taken into account. On the basis of the various analyses carried out it can be concluded that the disposal of different nuclear wastes in the Finnish bedrock in properly designed repositories meets the radiation protection objectives with good confidence. In addition, the studies indicate that the safety margins are considerable. This is due to the fact that the overall performance of the multiple barrier disposal systems analysed is not sensitive to possible unfavourable changes in barrier properties. From the optimization of protection point of view it can be concluded that there is no need to develop more effective repository designs than those analysed in this thesis. In fact, the results indicate that the most sophisticated designs have already gone beyond an optimal level of safety

  18. Using a plant health system framework to assess plant clinic performance in Uganda

    DEFF Research Database (Denmark)

    Danielsen, Solveig; Matsiko, Frank B.

    2016-01-01

    and expand, new analytical frameworks and tools are needed to identify factors influencing performance of services and systems in specific contexts, and to guide interventions. In this paper we apply a plant health system framework to assess plant clinic performance, using Uganda as a case study...... factors, influenced by basic operational and financial concerns, inter-institutional relations and public sector policies. Overall, there was a fairly close match between the plant health system attributes and plant clinic performance, suggesting that the framework can help explain system functioning....... A comparative study of plant clinics was carried out between July 2010 and September 2011 in the 12 districts where plant clinics were operating at that time. The framework enabled us to organise multiple issues and identify key features that affected the plant clinics. Clinic performance was, among other...

  19. Performance and cost assessment of solar driven humidification dehumidification desalination system

    International Nuclear Information System (INIS)

    Zubair, M. Ifras; Al-Sulaiman, Fahad A.; Antar, M.A.; Al-Dini, Salem A.; Ibrahim, Nasiru I.

    2017-01-01

    Highlights: • Optimization of a new HDH system integrated solar evacuated tubes collectors was conducted. • The mathematical models developed for the collector and the HDH system were validated. • A multi-location analysis was then performed for six locations in Saudi Arabia. • Sharurah was found to have the highest annual output and Dhahran the lowest at 19,445 and 16,430 L. • The cost per liter of water produced varies from $0.032 to $0.038, depends on the location. - Abstract: A humidification-dehumidification (HDH) desalination system integrated with solar evacuated tubes was optimized. Then, the optimized system was assessed for the operation in different geographical locations, and the rate of freshwater production and cost per liter were determined in each location. The system design proposed in this paper uses a heat pipe design evacuated tube collector, which performs significantly better based on cost. An HDH desalination system with a closed-air/open-water loop, connected to the collector, was evaluated to determine the optimum operating parameters and the system performance during daytime (from 8 am to 3 pm), as well as the average day of each month for an entire year. The impact of the effectiveness of the humidifier and the dehumidifier, as well as, the number of collectors, were also studied. The analyses were performed for Dhahran, Jeddah, Riyadh, Sharurah, Qassim, and Tabuk to determine the effects of varying the geographical location. Sharurah has the highest calculated productivity of freshwater and Dhahran has the lowest at 19,445 and 16,430 L, respectively. To have a comprehensive study of the system proposed, a cost analysis was also performed to determine the feasibility of the system and the cost of water production. Results show that the price varied from $0.032 to $0.038 per liter for the locations evaluated.

  20. Gamma camera performance: technical assessment protocol

    International Nuclear Information System (INIS)

    Bolster, A.A.; Waddington, W.A.

    1996-01-01

    This protocol addresses the performance assessment of single and dual headed gamma cameras. No attempt is made to assess the performance of any associated computing systems. Evaluations are usually performed on a gamma camera commercially available within the United Kingdom and recently installed at a clinical site. In consultation with the manufacturer, GCAT selects the site and liaises with local staff to arrange a mutually convenient time for assessment. The manufacturer is encouraged to have a representative present during the evaluation. Three to four days are typically required for the evaluation team to perform the necessary measurements. When access time is limited, the team will modify the protocol to test the camera as thoroughly as possible. Data are acquired on the camera's computer system and are subsequently transferred to the independent GCAT computer system for analysis. This transfer from site computer to the independent system is effected via a hardware interface and Interfile data transfer. (author)

  1. Gamma camera performance: technical assessment protocol

    Energy Technology Data Exchange (ETDEWEB)

    Bolster, A.A. [West Glasgow Hospitals NHS Trust, London (United Kingdom). Dept. of Clinical Physics; Waddington, W.A. [University College London Hospitals NHS Trust, London (United Kingdom). Inst. of Nuclear Medicine

    1996-12-31

    This protocol addresses the performance assessment of single and dual headed gamma cameras. No attempt is made to assess the performance of any associated computing systems. Evaluations are usually performed on a gamma camera commercially available within the United Kingdom and recently installed at a clinical site. In consultation with the manufacturer, GCAT selects the site and liaises with local staff to arrange a mutually convenient time for assessment. The manufacturer is encouraged to have a representative present during the evaluation. Three to four days are typically required for the evaluation team to perform the necessary measurements. When access time is limited, the team will modify the protocol to test the camera as thoroughly as possible. Data are acquired on the camera`s computer system and are subsequently transferred to the independent GCAT computer system for analysis. This transfer from site computer to the independent system is effected via a hardware interface and Interfile data transfer. (author).

  2. Progress in waste package and engineered barrier system performance assessment and design

    International Nuclear Information System (INIS)

    Van Luik, A.; Stahl, D.; Harrison, D.

    1993-01-01

    As part of the U.S. Department of Energy's evaluation of site suitability for a potential high-level radioactive waste repository, long-term interactions between the engineered barrier system and the site must be determined. This requires a waste-package/engineered-system design, a description of the environment around the emplacement zone, and models that simulate operative processes describing these engineered/natural systems interactions. Candidate designs are being evaluated, including a more robust, multi-barrier waste package, and a drift emplacement mode. Tools for evaluating designs, and emplacement mode are the currently available waste-package/engineered-system performance assessment codes development for the project. For assessments that support site suitability, environmental impact, or licensing decisions, more capable codes are needed. Code capability requirements are being written, and existing codes are to be evaluated against those requirements. Recommendations are being made to focus waste-packaging/engineered-system code-development

  3. A systems engineering cost analysis capability for use in assessing nuclear waste management system cost performance

    International Nuclear Information System (INIS)

    Shay, M.R.

    1990-04-01

    The System Engineering Cost Analysis (SECA) capability has been developed by the System Integration Branch of the US Department of Energy's Office of Civilian Radioactive Waste Management for use in assessing the cost performance of alternative waste management system configurations. The SECA capability is designed to provide rapid cost estimates of the waste management system for a given operational scenario and to permit aggregate or detailed cost comparisons for alternative waste system configurations. This capability may be used as an integral part of the System Integration Modeling System (SIMS) or, with appropriate input defining a scenario, as a separate cost analysis model

  4. Health system professionals, attitude towards necessary criteria for hospitals managers, performance assessment

    Directory of Open Access Journals (Sweden)

    ali janati

    2012-09-01

    Materials and Methods: This study was a qualitative research with thematic analysis method. By using semi structured questionnaire with 2 health system experts interview was conducted and 20 experts participated in focus group discussion. After each interview and group discussion withdrawals were checked with participants. The initial interviews were analyzed by two faculty members and then were combined. Results: 7 main themes about necessary criteria for hospital managers, performance assessment were obtained from experts, views. These themes are: skills related to planning, organization and staff performance management, leadership, information management, clinical governance and performance indicators. Conclusion: All participants in the study had a history of hospital management therefore their comments will be an effective step in identifying the criteria for making hospital managers, performance assessment tool. In addition to Professionals, perspectives and studies done in other countries, in order to design this kind of tools, it is necessary to adjust the obtained findings according to the local hospital conditions.

  5. Making Performance Assessments a Part of Accountability

    Science.gov (United States)

    Haun, Billy

    2018-01-01

    The purpose of this commentary is to describe recent efforts in Virginia to develop and use performance assessments, including the challenges that emerged during this process and key considerations for states that integrate performance assessment into their systems. Performance assessments can play an important role in preparing students for…

  6. Total System Performance Assessment Sensitivity Analyses for Final Nuclear Regulatory Commission Regulations

    International Nuclear Information System (INIS)

    Bechtel SAIC Company

    2001-01-01

    This Letter Report presents the results of supplemental evaluations and analyses designed to assess long-term performance of the potential repository at Yucca Mountain. The evaluations were developed in the context of the Nuclear Regulatory Commission (NRC) final public regulation, or rule, 10 CFR Part 63 (66 FR 55732 [DIRS 156671]), which was issued on November 2, 2001. This Letter Report addresses the issues identified in the Department of Energy (DOE) technical direction letter dated October 2, 2001 (Adams 2001 [DIRS 156708]). The main objective of this Letter Report is to evaluate performance of the potential Yucca Mountain repository using assumptions consistent with performance-assessment-related provisions of 10 CFR Part 63. The incorporation of the final Environmental Protection Agency (EPA) standard, 40 CFR Part 197 (66 FR 32074 [DIRS 155216]), and the analysis of the effect of the 40 CFR Part 197 EPA final rule on long-term repository performance are presented in the Total System Performance Assessment--Analyses for Disposal of Commercial and DOE Waste Inventories at Yucca Mountain--Input to Final Environmental Impact Statement and Site Suitability Evaluation (BSC 2001 [DIRS 156460]), referred to hereafter as the FEIS/SSE Letter Report. The Total System Performance Assessment (TSPA) analyses conducted and documented prior to promulgation of the NRC final rule 10 CFR Part 63 (66 FR 55732 [DIRS 156671]), were based on the NRC proposed rule (64 FR 8640 [DIRS 101680]). Slight differences exist between the NRC's proposed and final rules which were not within the scope of the FEIS/SSE Letter Report (BSC 2001 [DIRS 156460]), the Preliminary Site Suitability Evaluation (PSSE) (DOE 2001 [DIRS 155743]), and supporting documents for these reports. These differences include (1) the possible treatment of ''unlikely'' features, events and processes (FEPs) in evaluation of both the groundwater protection standard and the human-intrusion scenario of the individual

  7. Performance Assessment of a Low-Level Radioactive Waste Disposal Site using GoldSim Integrated Systems Model

    Science.gov (United States)

    Merrell, G.; Singh, A.; Tauxe, J.; Perona, R.; Dornsife, W.; grisak, G. E.; Holt, R. M.

    2011-12-01

    Texas Commission on Environmental Quality has approved licenses for four landfills at the Waste Control Specialists (WCS) site located in Andrews County, West Texas. The site includes a hazardous waste landfill and three landfills for radioactive waste. An updated performance assessment is necessary prior to acceptance of waste at the landfills. The updated performance assessment a) provides for more realistic and flexible dose modeling capabilities, b) addresses all plausible release and accident scenarios as they relate to the performance objectives, c) includes impact of climate and hydrologic scenarios that may impact long-term performance of the landfill, d) addresses impact of cover naturalization and degradation on the landfill, and e) incorporates uncertainty and sensitivity analysis for critical parameters. For the updated performance assessment, WCS has developed an integrated systems level performance assessment model using the GoldSim platform. GoldSim serves as a model for integrating all of the major components of a performance assessment, which include the radionuclide source term, facility design, environmental transport pathways, exposure scenarios, and radiological doses. Unlike many computer models that are based on first principles, GoldSim is a systems level model that can be used to integrate and abstract more complex sub-models into one system. This can then be used to assess the results into a unified model of the disposal system and environment. In this particular application, the GoldSim model consists of a) hydrogeologic model that simulates flow and transport through the Dockum geologic unit that underlies all of the waste facilities, b) waste cells that represent the containment unit and simulate degradation of waste forms, radionuclide leaching, and partitioning into the liquid and vapor phase within the waste unit, c) a cover system model that simulates upward diffusive transport from the underground repository to the atmosphere. In

  8. Small animal PET: aspects of performance assessment

    International Nuclear Information System (INIS)

    Weber, Simone; Bauer, Andreas

    2004-01-01

    Dedicated small animal positron emission tomography (PET) systems are increasingly prevalent in industry (e.g. for preclinical drug development) and biological research. Such systems permit researchers to perform animal studies of a longitudinal design characterised by repeated measurements in single animals. With the advent of commercial systems, scanners have become readily available and increasingly popular. As a consequence, technical specifications are becoming more diverse, making scanner systems less broadly applicable. The investigator has, therefore, to make a decision regarding which type of scanner is most suitable for the intended experiments. This decision should be based on gantry characteristics and the physical performance. The first few steps have been taken towards standardisation of the assessment of performance characteristics of dedicated animal PET systems, though such assessment is not yet routinely implemented. In this review, we describe current methods of evaluation of physical performance parameters of small animal PET scanners. Effects of methodologically different approaches on the results are assessed. It is underscored that particular attention has to be paid to spatial resolution, sensitivity, scatter fraction and count rate performance. Differences in performance measurement methods are described with regard to commercially available systems, namely the Concorde MicroPET systems P4 and R4 and the quad-HIDAC. Lastly, consequences of differences in scanner performance parameters are rated with respect to applications of small animal PET. (orig.)

  9. High-volume image quality assessment systems: tuning performance with an interactive data visualization tool

    Science.gov (United States)

    Bresnahan, Patricia A.; Pukinskis, Madeleine; Wiggins, Michael

    1999-03-01

    Image quality assessment systems differ greatly with respect to the number and types of mags they need to evaluate, and their overall architectures. Managers of these systems, however, all need to be able to tune and evaluate system performance, requirements often overlooked or under-designed during project planning. Performance tuning tools allow users to define acceptable quality standards for image features and attributes by adjusting parameter settings. Performance analysis tools allow users to evaluate and/or predict how well a system performs in a given parameter state. While image assessment algorithms are becoming quite sophisticated, duplicating or surpassing the human decision making process in their speed and reliability, they often require a greater investment in 'training' or fine tuning of parameters in order to achieve optimum performance. This process may involve the analysis of hundreds or thousands of images, generating a large database of files and statistics that can be difficult to sort through and interpret. Compounding the difficulty is the fact that personnel charged with tuning and maintaining the production system may not have the statistical or analytical background required for the task. Meanwhile, hardware innovations have greatly increased the volume of images that can be handled in a given time frame, magnifying the consequences of running a production site with an inadequately tuned system. In this paper, some general requirements for a performance evaluation and tuning data visualization system are discussed. A custom engineered solution to the tuning and evaluation problem is then presented, developed within the context of a high volume image quality assessment, data entry, OCR, and image archival system. A key factor influencing the design of the system was the context-dependent definition of image quality, as perceived by a human interpreter. This led to the development of a five-level, hierarchical approach to image quality

  10. Achieving transparency in the total system performance assessment of a potential high level radioactive waste repository at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Bailey, J.; Rickertsen, L.; Cotton, T.

    1999-01-01

    This paper has presented an approach to quantitative assessment of the degree of postclosure defense-in-depth provided by the reference system of the VA (Viability Assessment). This approach identifies principal barriers, assesses barriers for common uncertainty and failure mode, conducts barrier neutralization analyses, and evaluates overall defense-in-depth. The neutralization approach of step 3 is particularly useful in untangling the contributions of various barriers to the results calculated by performance assessments. In fact, it provides the only way of assessing the contribution of barriers that are fully redundant with one another. The approach has been applied to the VA reference system. It shows how the natural transport barriers contribute to performance of the system. Since their individual contributions are redundant, uncertainties in those individual contributions are reduced in importance. The analyses also suggest uncertainties common to both of these barriers are important to the safety assessment. Thus, the approach appears to be capable of determining the contribution of the principal barriers to system performance. The ability to use performance assessment to show not only how the repository system is expected to perform, but also how it achieves that performance, should contribute substantially towards providing needed transparency to the safety case for a geologic repository. It is also a valuable tool during the development of the repository design and associated safety case, by identifying areas in which performance would be enhanced by increased redundancy

  11. Guidelines for evaluating the environmental performance of Product/Service-Systems through life cycle assessment

    DEFF Research Database (Denmark)

    Kjær, Louise Laumann; Pigosso, Daniela C. A.; McAloone, Tim C.

    2018-01-01

    Product/Service-Systems (PSS) such as integrated solutions, performance-based contracts or sharing systems are often proposed as means to enable improved environmental sustainability. However, PSS are not necessarily environmentally benign compared to conventional systems. Quantitative environmen......Product/Service-Systems (PSS) such as integrated solutions, performance-based contracts or sharing systems are often proposed as means to enable improved environmental sustainability. However, PSS are not necessarily environmentally benign compared to conventional systems. Quantitative....... In this article, we propose a set of guidelines consisting of six steps, which elaborates the LCA process with respect to the specific consideration for PSS assessment. The guidelines were developed based on identified challenges for the application of LCA on PSS, a review of existing LCAs on PSS case studies...

  12. Performance assessment and microbial diversity of two pilot scale multi-stage sub-surface flow constructed wetland systems.

    Science.gov (United States)

    Babatunde, A O; Miranda-CasoLuengo, Raul; Imtiaz, Mehreen; Zhao, Y Q; Meijer, Wim G

    2016-08-01

    This study assessed the performance and diversity of microbial communities in multi-stage sub-surface flow constructed wetland systems (CWs). Our aim was to assess the impact of configuration on treatment performance and microbial diversity in the systems. Results indicate that at loading rates up to 100gBOD5/(m(2)·day), similar treatment performances can be achieved using either a 3 or 4 stage configuration. In the case of phosphorus (P), the impact of configuration was less obvious and a minimum of 80% P removal can be expected for loadings up to 10gP/(m(2)·day) based on the performance results obtained within the first 16months of operation. Microbial analysis showed an increased bacterial diversity in stage four compared to the first stage. These results indicate that the design and configuration of multi-stage constructed wetland systems may have an impact on the treatment performance and the composition of the microbial community in the systems, and such knowledge can be used to improve their design and performance. Copyright © 2016. Published by Elsevier B.V.

  13. Operational human performance reliability assessment (OHPRA)

    International Nuclear Information System (INIS)

    Haas, P.M.; Swanson, P.J.; Connelly, E.M.

    1993-01-01

    Operational Human Performance Reliability Assessment (OHPRA) is an approach for assessing human performance that is being developed in response to demands from modern process industries for practical and effective tools to assess and improve human performance, and therefore overall system performance and safety. The single most distinguishing feature of the approach is that is defines human performance in open-quotes operationalclose quotes terms. OHPRA is focused not on generation of human error probabilities, but on practical analysis of human performance to aid management in (1) identifying open-quotes fixableclose quotes problems and (2) providing input on the importance and nature of potential improvements. Development of the model in progress uses a unique approach for eliciting expert strategies for assessing performance. A PC-based model incorporating this expertise is planned. A preliminary version of the approach has already been used successfully to identify practical human performance problems in reactor and chemical process plant operations

  14. Assessment of the effect of nitrogen gas on passive containment cooling system performance

    International Nuclear Information System (INIS)

    Ha, Huiun; Suh, Jungsoo

    2016-01-01

    As a part of the passive containment cooling system (PCCS) of Innovative PWR development project, we have been investigating the effect of the nitrogen gas released from safety injection tank (SIT) on PCCS performance. With the design characteristics of APR1400 and conceptual design of PCCS, we developed a GOTHIC model of the APR1400 containment with PCCS. The calculation model is described herein, and representative results from the calculation are presented as well. The results of the present work will be used for the design of PCCS. APR1400 GOTHIC model was developed for assessment on the effect of SIT nitrogen gas on passive containment cooling system performance. Calculation results confirmed that influence of nitrogen gas release is negligible; however, further studies should be performed to confirm effect of non-condensable gas on the final performance of PCCS. These insights are important for developing the PCCS of Innovative PWR

  15. Assessment of the effect of nitrogen gas on passive containment cooling system performance

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Huiun; Suh, Jungsoo [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    As a part of the passive containment cooling system (PCCS) of Innovative PWR development project, we have been investigating the effect of the nitrogen gas released from safety injection tank (SIT) on PCCS performance. With the design characteristics of APR1400 and conceptual design of PCCS, we developed a GOTHIC model of the APR1400 containment with PCCS. The calculation model is described herein, and representative results from the calculation are presented as well. The results of the present work will be used for the design of PCCS. APR1400 GOTHIC model was developed for assessment on the effect of SIT nitrogen gas on passive containment cooling system performance. Calculation results confirmed that influence of nitrogen gas release is negligible; however, further studies should be performed to confirm effect of non-condensable gas on the final performance of PCCS. These insights are important for developing the PCCS of Innovative PWR.

  16. Assessment of In-Cloud Enterprise Resource Planning System Performed in a Virtual Cluster

    Directory of Open Access Journals (Sweden)

    Bao Rong Chang

    2015-01-01

    Full Text Available This paper introduces a high-performed high-availability in-cloud enterprise resources planning (in-cloud ERP which has deployed in the virtual machine cluster. The proposed approach can resolve the crucial problems of ERP failure due to unexpected downtime and failover between physical hosts in enterprises, causing operation termination and hence data loss. Besides, the proposed one together with the access control authentication and network security is capable of preventing intrusion hacked and/or malicious attack via internet. Regarding system assessment, cost-performance (C-P ratio, a remarkable cost effectiveness evaluation, has been applied to several remarkable ERP systems. As a result, C-P ratio evaluated from the experiments shows that the proposed approach outperforms two well-known benchmark ERP systems, namely, in-house ECC 6.0 and in-cloud ByDesign.

  17. Development of Integrated Assessment Technology of Risk and Performance

    International Nuclear Information System (INIS)

    Yang, Jun Eon; Kang, Dae Il; Kang, Hyun Gook

    2010-04-01

    The main idea and contents are summarized as below 1) Development of new risk/performance assessment system innovating old labor-intensive risk assessment structure - New consolidated risk assessment technology from various hazard(flood, fire, seismic in NPP) - BOP model development for performance monitoring - Consolidated risk/performance management system for consistency and efficiency of NPP 2) Resolution technology for pending issues in PSA - Base technology for PSA of digital I and C system - Base technology for seismic PSA reflecting domestic seismic characteristics and aging effect - Uncertainty reduction technology for level 2 PSA and best estimation of containment failure frequency 3) Next generation risk/performance assessment technology - Human-induced error reduction technology for efficient operation of a NPP

  18. River Protection Project information systems assessment

    International Nuclear Information System (INIS)

    JOHNSON, A.L.

    1999-01-01

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report

  19. Performance assessment of human resource by integration of HSE and ergonomics and EFQM management system.

    Science.gov (United States)

    Sadegh Amalnick, Mohsen; Zarrin, Mansour

    2017-03-13

    Purpose The purpose of this paper is to present an integrated framework for performance evaluation and analysis of human resource (HR) with respect to the factors of health, safety, environment and ergonomics (HSEE) management system, and also the criteria of European federation for quality management (EFQM) as one of the well-known business excellence models. Design/methodology/approach In this study, an intelligent algorithm based on adaptive neuro-fuzzy inference system (ANFIS) along with fuzzy data envelopment analysis (FDEA) are developed and employed to assess the performance of the company. Furthermore, the impact of the factors on the company's performance as well as their strengths and weaknesses are identified by conducting a sensitivity analysis on the results. Similarly, a design of experiment is performed to prioritize the factors in the order of importance. Findings The results show that EFQM model has a far greater impact upon the company's performance than HSEE management system. According to the obtained results, it can be argued that integration of HSEE and EFQM leads to the performance improvement in the company. Practical implications In current study, the required data for executing the proposed framework are collected via valid questionnaires which are filled in by the staff of an aviation industry located in Tehran, Iran. Originality/value Managing HR performance results in improving usability, maintainability and reliability and finally in a significant reduction in the commercial aviation accident rate. Also, study of factors affecting HR performance authorities participate in developing systems in order to help operators better manage human error. This paper for the first time presents an intelligent framework based on ANFIS, FDEA and statistical tests for HR performance assessment and analysis with the ability of handling uncertainty and vagueness existing in real world environment.

  20. Hydrologic-geochemical modeling needs for nuclear waste disposal systems performance assessments from the NEA perspective

    International Nuclear Information System (INIS)

    Muller, A.B.

    1986-01-01

    Credible scenarios for releases from high level nuclear waste repositories require radionuclides to be mobilized and transported by ground water. The capability to predict ground water flow velocities and directions as well as radionuclide concentrations in the flow system as a function of time are essential for assessing the performance of disposal systems. The first of these parameters can be estimated by hydrologic modeling while the concentrations can be predicted by geochemical modeling. The complementary use of empirical and phenomenological approaches to the geochemical modeling, when effectively coupled with hydrologic models can provide the tools needed for realistic performance assessment. An overview of the activities of the NEA in this area, with emphasis on the geochemical data bases (ISIRS for Ksub(d) data and the thermochemical data base critical review), rock/water interaction modeling (code development and short-courses), and hydrologic-geochemical code coupling (workshop and in-house activities) is presented in this paper from the perspective of probabilistic risk assessment needs. (author)

  1. Performance assessment

    International Nuclear Information System (INIS)

    Doe, T.

    1985-01-01

    The purpose of performance assessment is to show that the repository is expected to serve its stated function - disposing of radioactive waste safely both during operation and for the postclosure period. Performance assessment is a straightforward concept, but its application may be very complicated. The concept of performance assessment has been clarified by the Nuclear Regulatory Commission (NRC) in their Draft Generic Technical Position on Licensing Assessment Methodology for High-Level Waste Geologic Repositories (NRC, 1984). This document has gone a long way toward defining the criteria that the NRC will use to determine whether or not information from site characterization is adequate to meet the regulations of the Nuclear Regulatory Commission and the Environmental Protection Agency (EPA). A favorable determination is required for issuance of a construction authorization, which is the first major regulatory requirement for developing a working repository. It is, therefore, essential that a research program be developed that not only resolves the outstanding technical issues, but also does it in such a way that the results are clearly applicable to the formal performance assessment and licensing procedures. The definitions of performance assessment are reviewed and the current NRC thinking is summarized

  2. Automatic Human Movement Assessment With Switching Linear Dynamic System: Motion Segmentation and Motor Performance.

    Science.gov (United States)

    de Souza Baptista, Roberto; Bo, Antonio P L; Hayashibe, Mitsuhiro

    2017-06-01

    Performance assessment of human movement is critical in diagnosis and motor-control rehabilitation. Recent developments in portable sensor technology enable clinicians to measure spatiotemporal aspects to aid in the neurological assessment. However, the extraction of quantitative information from such measurements is usually done manually through visual inspection. This paper presents a novel framework for automatic human movement assessment that executes segmentation and motor performance parameter extraction in time-series of measurements from a sequence of human movements. We use the elements of a Switching Linear Dynamic System model as building blocks to translate formal definitions and procedures from human movement analysis. Our approach provides a method for users with no expertise in signal processing to create models for movements using labeled dataset and later use it for automatic assessment. We validated our framework on preliminary tests involving six healthy adult subjects that executed common movements in functional tests and rehabilitation exercise sessions, such as sit-to-stand and lateral elevation of the arms and five elderly subjects, two of which with limited mobility, that executed the sit-to-stand movement. The proposed method worked on random motion sequences for the dual purpose of movement segmentation (accuracy of 72%-100%) and motor performance assessment (mean error of 0%-12%).

  3. River Protection Project information systems assessment

    Energy Technology Data Exchange (ETDEWEB)

    JOHNSON, A.L.

    1999-07-28

    The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

  4. The use of Leeds Test Objects in the assessment of the performance of radiological imaging systems: an introduction

    International Nuclear Information System (INIS)

    Cowen, A.R.

    1986-01-01

    Over the preceding decade the Leeds Radiological Imaging Group have developed a range of test objects with which to assess the performance of radiological imaging systems. The types of imaging equipment which can be assessed include X-ray image intensifier television systems, small-format 100mm/105mm fluorography systems and radiographic screen-film combinations. We have recently extended our interest to the evaluation of digital radiological imaging equipment including digital subtraction fluorography and digital (greyscale) radiographic imaging systems. These test objects were initially developed for the purpose of evaluating imaging performance under laboratory conditions but they have also proved useful under field (clinical) conditions. (author)

  5. A simplified radionuclide source term for total-system performance assessment

    International Nuclear Information System (INIS)

    Wilson, M.L.

    1991-11-01

    A parametric model for releases of radionuclides from spent-nuclear-fuel containers in a waste repository is presented. The model is appropriate for use in preliminary total-system performance assessments of the potential repository site at Yucca Mountain, Nevada; for this reason it is simpler than the models used for detailed studies of waste-package performance. Terms are included for releases from the spent fuel pellets, from the pellet/cladding gap and the grain boundaries within the fuel pellets, from the cladding of the fuel rods, and from the radioactive fuel-assembly parts. Multiple barriers are considered, including the waste container, the fuel-rod cladding, the thermal ''dry-out'', and the waste form itself. The basic formulas for release from a single fuel rod or container are extended to formulas for expected releases for the whole repository by using analytic expressions for probability distributions of some important parameters. 39 refs., 4 figs., 4 tabs

  6. Subjective and objective performance assessment : Performance pay at Trelleborg Forsheda AB

    OpenAIRE

    Luotonen, David; Hasselström, Markus

    2009-01-01

      The purpose of this thesis is to understand the opinions and potential effects of objective and subjective assessments of performance as a basis for performance pay for blue-collar workers. The study takes a qualitative approach to find out how and why four companies - Trelleborg Forsheda, Finnveden Powertrain, Isaberg Rapid and Parker Hannifin- work with salaries, incentive system and performance assessment the way they do. The concept of individual salary is central in this thesis, and in...

  7. Consideration of liners and covers in performance assessments

    Energy Technology Data Exchange (ETDEWEB)

    Phifer, Mark A. [Savannah River National Laboratory, Aiken, SC (United States); Seitz, Robert R. [Savannah River National Laboratory, Aiken, SC (United States); Suttora, Linda C. [USDOE Enviromental Management, Washington, DC (United States)

    2014-09-18

    On-site disposal cells are in use and being considered at several United States Department of Energy (USDOE) sites as the final disposition for large amounts of waste associated with cleanup of contaminated areas and facilities. These disposal cells are typically regulated by States and/or the U.S. Environmental Protection Agency under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in addition to having to comply with requirements in DOE Order 435.1, Radioactive Waste Management due to the radioactive waste. The USDOE-Environmental Management Office of Site Restoration formed a working group to foster improved communication and sharing of information for personnel associated with these CERCLA disposal cells and work towards more consistent assumptions, as appropriate, for technical and policy considerations related to CERCLA risk assessments and DOE Order 435.1 performance assessments in support of a Record of Decision and Disposal Authorization Statement, respectively. One of the issues considered by the working group, which is addressed in this report, was how to appropriately consider the performance of covers and liners/leachate collections systems in the context of a DOE Order 435.1 performance assessment (PA). This same information may be appropriate for consideration within CERCLA risk assessments for these facilities. These OSDCs are generally developed to meet hazardous waste (HW) disposal design standards under the Resource Conservation and Recovery Act (RCRA) as well as the DOE Order 435.1 performance based standards for disposal of radioactive waste. To meet the standards for HW, the facilities typically include engineered covers and liner/leachate collection systems. Thus, when considering such facilities in the context of a DOE Order 435.1 PA, there is a need to address the evolution of performance of covers and liner/leachate collection systems in the context of meeting a performance standard considering time

  8. A Microbial Assessment Scheme to measure microbial performance of Food Safety Management Systems.

    Science.gov (United States)

    Jacxsens, L; Kussaga, J; Luning, P A; Van der Spiegel, M; Devlieghere, F; Uyttendaele, M

    2009-08-31

    A Food Safety Management System (FSMS) implemented in a food processing industry is based on Good Hygienic Practices (GHP), Hazard Analysis Critical Control Point (HACCP) principles and should address both food safety control and assurance activities in order to guarantee food safety. One of the most emerging challenges is to assess the performance of a present FSMS. The objective of this work is to explain the development of a Microbial Assessment Scheme (MAS) as a tool for a systematic analysis of microbial counts in order to assess the current microbial performance of an implemented FSMS. It is assumed that low numbers of microorganisms and small variations in microbial counts indicate an effective FSMS. The MAS is a procedure that defines the identification of critical sampling locations, the selection of microbiological parameters, the assessment of sampling frequency, the selection of sampling method and method of analysis, and finally data processing and interpretation. Based on the MAS assessment, microbial safety level profiles can be derived, indicating which microorganisms and to what extent they contribute to food safety for a specific food processing company. The MAS concept is illustrated with a case study in the pork processing industry, where ready-to-eat meat products are produced (cured, cooked ham and cured, dried bacon).

  9. Application of fuzzy expert system on LILW performance assessment

    International Nuclear Information System (INIS)

    Lemos, F.L. de; Sullivan, T.

    2002-01-01

    A complete LILW repository performance assessment requires the involvement between several experts in many fields of science. Many sources of uncertainties arise due to complexity of interaction of environmental parameters, lack of data and ignorance, this makes predictive analysis and interpretation difficult. This difficulty in understanding the impact of the ambiguities is even higher when it comes to public and decision makers involvement. Traditional methods of data analysis, while having strong mathematical basis, many times are not adequate to deal with ambiguous data. These ambiguities can be an obstacle to make the results easier to understand and defensible. A methodology of decision making, based on fuzzy logic, can help the interaction between experts, decision makers and the public. This method is the basis of an expert system which can help the analysis of very complex and ambiguous processes. (author)

  10. Hanford low-level tank waste interim performance assessment

    International Nuclear Information System (INIS)

    Mann, F.M.

    1997-01-01

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and performance early in the disposal system project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives

  11. Development of a Risk-Based Probabilistic Performance-Assessment Method for Long-Term Cover Systems - 2nd Edition

    International Nuclear Information System (INIS)

    HO, CLIFFORD K.; ARNOLD, BILL W.; COCHRAN, JOHN R.; TAIRA, RANDAL Y.

    2002-01-01

    A probabilistic, risk-based performance-assessment methodology has been developed to assist designers, regulators, and stakeholders in the selection, design, and monitoring of long-term covers for contaminated subsurface sites. This report describes the method, the software tools that were developed, and an example that illustrates the probabilistic performance-assessment method using a repository site in Monticello, Utah. At the Monticello site, a long-term cover system is being used to isolate long-lived uranium mill tailings from the biosphere. Computer models were developed to simulate relevant features, events, and processes that include water flux through the cover, source-term release, vadose-zone transport, saturated-zone transport, gas transport, and exposure pathways. The component models were then integrated into a total-system performance-assessment model, and uncertainty distributions of important input parameters were constructed and sampled in a stochastic Monte Carlo analysis. Multiple realizations were simulated using the integrated model to produce cumulative distribution functions of the performance metrics, which were used to assess cover performance for both present- and long-term future conditions. Performance metrics for this study included the water percolation reaching the uranium mill tailings, radon gas flux at the surface, groundwater concentrations, and dose. Results from uncertainty analyses, sensitivity analyses, and alternative design comparisons are presented for each of the performance metrics. The benefits from this methodology include a quantification of uncertainty, the identification of parameters most important to performance (to prioritize site characterization and monitoring activities), and the ability to compare alternative designs using probabilistic evaluations of performance (for cost savings)

  12. Total System Performance Assessment, 1993: An evaluation of the potential Yucca Mountain repository, B00000000-01717-2200-00099, Rev. 01

    International Nuclear Information System (INIS)

    Andrews, R.W.; Dale, T.F.; McNeish, J.A.

    1994-03-01

    Total System Performance Assessments are an important component in the evaluation of the suitability of Yucca Mountain, Nevada as a potential site for a mined geologic repository for the permanent disposal of high-level radioactive wastes in the United States. The Total System Performance Assessments are conducted iteratively during the site characterization to identify issues which should be addressed by the characterization and design activities as well as providing input to regulatory/licensing and programmatic decisions. During fiscal years 1991 and 1992, the first iteration of Total System Performance Assessment (hereafter referred to as TSPA 1991) was completed by Sandia National Laboratories and Pacific Northwest Laboratory. Beginning in fiscal year 1993, the Civilian Radioactive Waste Management System Management and Operating Contractor was assigned the responsibility to plan, coordinate, and contribute to the second iteration of Total System Performance Assessment (hereafter referred to as TSPA 1993). This document presents the objectives, approach, assumptions, input, results, conclusions, and recommendations associated with the Management and Operating Contractor contribution to TSPA 1993. A parallel effort was conducted by Sandia National Laboratories and is reported in Wilson et al. (1994, in press)

  13. Performance assessment review for DOE LLW disposal facilities

    International Nuclear Information System (INIS)

    Wilhite, Elmer L.

    1992-01-01

    The United States Department of Energy (US DOE) disposes of low-level radioactive waste in near-surface disposal facilities. Safety of the disposal operations is evaluated for operational safety as well as long-term safety. Operational safety is evaluated based on the perceived level of hazard of the operation and may vary from a simple safety assessment to a safety analysis report. Long-term safety of all low-level waste disposal systems is evaluated through the conduct of a radiological performance assessment. The US DOE has established radiological performance objectives for disposal of low-level waste. They are to protect a member of the general public from receiving over 25 mrem/y, and an inadvertent intruder into the waste from receiving over 100 mrem/y continuous exposure or 500 mrem from a single exposure. For a disposal system to be acceptable, a performance assessment must be prepared which must be technically accurate and provide reasonable assurance that these performance objectives are met. Technical quality of the performance assessments is reviewed by a panel of experts. The panel of experts is used in two ways to assure the technical quality of performance assessment. A preliminary (generally 2 day) review by the panel is employed in the late stages of development to provide guidance on finalizing the performance assessment. The comments from this review are communicated to the personnel responsible for the performance assessment for consideration and incorporation. After finalizing the performance assessment, it is submitted for a formal review. The formal review is accomplished by a much more thorough analysis of the performance assessment over a multi-week time period. The panel then formally reports their recommendations to the US DOE waste management senior staff who make the final determination on acceptability of the performance assessment. A number of lessons have been learned from conducting several preliminary reviews of performance

  14. Modeling and performance assessment in QinetiQ of EO and IR airborne reconnaissance systems

    Science.gov (United States)

    Williams, John W.; Potter, Gary E.

    2002-11-01

    QinetiQ are the technical authority responsible for specifying the performance requirements for the procurement of airborne reconnaissance systems, on behalf of the UK MoD. They are also responsible for acceptance of delivered systems, overseeing and verifying the installed system performance as predicted and then assessed by the contractor. Measures of functional capability are central to these activities. The conduct of these activities utilises the broad technical insight and wide range of analysis tools and models available within QinetiQ. This paper focuses on the tools, methods and models that are applicable to systems based on EO and IR sensors. The tools, methods and models are described, and representative output for systems that QinetiQ has been responsible for is presented. The principle capability applicable to EO and IR airborne reconnaissance systems is the STAR (Simulation Tools for Airborne Reconnaissance) suite of models. STAR generates predictions of performance measures such as GRD (Ground Resolved Distance) and GIQE (General Image Quality) NIIRS (National Imagery Interpretation Rating Scales). It also generates images representing sensor output, using the scene generation software CAMEO-SIM and the imaging sensor model EMERALD. The simulated image 'quality' is fully correlated with the predicted non-imaging performance measures. STAR also generates image and table data that is compliant with STANAG 7023, which may be used to test ground station functionality.

  15. Probabilistic safety assessment of LWR containment systems performance. Report of principal working group n.5 on risk assessment

    International Nuclear Information System (INIS)

    Holloway, N.J.; Harper, F.T.; Bellard, S.W.

    1992-01-01

    This report reviews current approaches to PSA of LWR containment systems performance. It is based on a variety of recent PSA reports which deal with Level-2 PSA. The report is a summary of recent state-of-the-art containment analysis and is intended to assist analysts in their selection of the most appropriate methods of extending Level-1 plant safety evaluations into Level-2 assessments of the containment performance. The document is primarily concerned with the performance of the containment as an engineered system rather than with the source terms consequent upon its failure. It is addressed mainly to the performance of large dry PWR containments, with a secondary emphasis on other containment types. After explaining the purposes of these analyses, a survey of LWR containment analysis options is presented: direct approaches using containment event tree construction, indirect approaches based on previous PSAs, alternative and novel approaches. The selection process is then described, followed by conclusions on their suitability for various cases: accident management, research prioritization, identifying design weaknesses, specific issue resolution, modelling physical reality, etc.

  16. Engineered Barrier System performance requirements systems study report. Revision 02

    International Nuclear Information System (INIS)

    Balady, M.A.

    1997-01-01

    This study evaluates the current design concept for the Engineered Barrier System (EBS), in concert with the current understanding of the geologic setting to assess whether enhancements to the required performance of the EBS are necessary. The performance assessment calculations are performed by coupling the EBS with the geologic setting based on the models (some of which were updated for this study) and assumptions used for the 1995 Total System Performance Assessment (TSPA). The need for enhancements is determined by comparing the performance assessment results against the EBS related performance requirements. Subsystem quantitative performance requirements related to the EBS include the requirement to allow no more than 1% of the waste packages (WPs) to fail before 1,000 years after permanent closure of the repository, as well as a requirement to control the release rate of radionuclides from the EBS. The EBS performance enhancements considered included additional engineered components as well as evaluating additional performance available from existing design features but for which no performance credit is currently being taken

  17. Engineered Barrier System performance requirements systems study report. Revision 02

    Energy Technology Data Exchange (ETDEWEB)

    Balady, M.A.

    1997-01-14

    This study evaluates the current design concept for the Engineered Barrier System (EBS), in concert with the current understanding of the geologic setting to assess whether enhancements to the required performance of the EBS are necessary. The performance assessment calculations are performed by coupling the EBS with the geologic setting based on the models (some of which were updated for this study) and assumptions used for the 1995 Total System Performance Assessment (TSPA). The need for enhancements is determined by comparing the performance assessment results against the EBS related performance requirements. Subsystem quantitative performance requirements related to the EBS include the requirement to allow no more than 1% of the waste packages (WPs) to fail before 1,000 years after permanent closure of the repository, as well as a requirement to control the release rate of radionuclides from the EBS. The EBS performance enhancements considered included additional engineered components as well as evaluating additional performance available from existing design features but for which no performance credit is currently being taken.

  18. Performance assessment of containment filtered venting system with Venturi scrubber

    International Nuclear Information System (INIS)

    Adinarayna, K.N.V.; Ali, Seik Mansoor; Balasubramaniyan, V.

    2015-01-01

    Venting through appropriate filtration systems is now being considered as a severe accident management strategy for maintaining the containment integrity and also as a means to reduce the radiological consequences to the public and environment. The option of filtered containment venting appears to have assumed significance in the post- Fukushima accident backdrop. Back-fitting of a suitable Venturi scrubber based CFVS for the Indian BWRs (TAPS- 1 and 2) at Tarapur is now being contemplated. Several key issues need to be carefully addressed for ensuring the desired functional capability of such a system. At the outset, this paper highlights a few thermal hydraulic issues that are of interest from regulatory perspective. This is followed by a detailed description of the mathematical models developed for assessing the depressurization characteristics of CFVS, energy absorption capacity of the Scrubber Tank (ST) water inventory, iodine removal and aerosol retention capability etc. Finally, application of these models to investigate the response of CFVS under twin unit SBO conditions in TAPS-1 and 2 is presented. The studies presented here give insight into the key variables affecting the CFVS performance and would be useful to both the system designer as well as the regulator. (author)

  19. Performance Assessment in Courts - The Swiss Case

    Directory of Open Access Journals (Sweden)

    Andreas Lienhard

    2014-12-01

    Full Text Available Abstract Performance assessments have become commonplace in management, even in the public sector. With the increasing pressure on courts to perform while making efficient use of resources, performance assessments in the justice system are also gaining in importance. However, the need for judicial independence poses special challenges for performance assessments in courts. Against this background, this article conducts a constitutional appraisal, and contrasts the need for judicial independence with the principles governing effectiveness and efficiency, self-government and supervision, and appointment and re-appointment. A duty to guarantee justice can be derived from this that does not in principle exclude the performance assessment of judges, but even renders it essential, subject to compliance with certain requirements. In these circumstances, it seems hardly surprising that numerous countries conduct performance assessments of judges and also that various international institutions have developed principles for this purpose, a summary of which is presented – in Switzerland’s case based on a recently conducted survey. In the field of conflict between the guaranteeing justice and protecting the judiciary, the following key questions arise in particular: What is the purpose of performance assessments and what are the consequences?What is subjected to a performance assessment and what are the assessment criteria?How is performance recorded as the basis for the performance assessment?Who is subjected to a performance assessment, and must a distinction be made between judges in higher and lower courts?Who carries out the performance assessment and what methods of protecting one’s rights are available?Who should receive the results of the performance assessment?The contribution sketches out possible answers to these key questions and aims to encourage academics and practitioners to give further consideration to this subject.

  20. Personnel Performance Assessment in Information Systems Outsourcing Environments

    Science.gov (United States)

    Casado-Lumbreras, Cristina; Soto-Acosta, Pedro; Colomo-Palacios, Ricardo; de Pablos, Patricia Ordonez

    2011-01-01

    Purpose: The aim of this paper is to present a tool which uses semantic technologies for personnel performance and workplace learning assessment in outsourced information technology environments. Design/methodology/approach: The paper presents the tool from a technical perspective and introduces a use case that depicts the main features related to…

  1. Models used to assess the performance of photovoltaic systems.

    Energy Technology Data Exchange (ETDEWEB)

    Stein, Joshua S.; Klise, Geoffrey T.

    2009-12-01

    This report documents the various photovoltaic (PV) performance models and software developed and utilized by researchers at Sandia National Laboratories (SNL) in support of the Photovoltaics and Grid Integration Department. In addition to PV performance models, hybrid system and battery storage models are discussed. A hybrid system using other distributed sources and energy storage can help reduce the variability inherent in PV generation, and due to the complexity of combining multiple generation sources and system loads, these models are invaluable for system design and optimization. Energy storage plays an important role in reducing PV intermittency and battery storage models are used to understand the best configurations and technologies to store PV generated electricity. Other researcher's models used by SNL are discussed including some widely known models that incorporate algorithms developed at SNL. There are other models included in the discussion that are not used by or were not adopted from SNL research but may provide some benefit to researchers working on PV array performance, hybrid system models and energy storage. The paper is organized into three sections to describe the different software models as applied to photovoltaic performance, hybrid systems, and battery storage. For each model, there is a description which includes where to find the model, whether it is currently maintained and any references that may be available. Modeling improvements underway at SNL include quantifying the uncertainty of individual system components, the overall uncertainty in modeled vs. measured results and modeling large PV systems. SNL is also conducting research into the overall reliability of PV systems.

  2. Method for assessing the performance of a material control and accounting system at an operating nuclear fuel processing facility

    International Nuclear Information System (INIS)

    Ellwein, L.B.; Harris, L.; Altman, W.D.; Gramann, R.H.

    1981-01-01

    This paper discusses a method for assessing the performance of a material control and accounting (MCandA) system in an operating nuclear fuel processing facility. The performance criteria inherent in the assessment are 16 key goals established by NRC's 1978 Material Control and Material Accounting Task Force. 7 refs

  3. Performance evaluations of continuous glucose monitoring systems: precision absolute relative deviation is part of the assessment.

    Science.gov (United States)

    Obermaier, Karin; Schmelzeisen-Redeker, Günther; Schoemaker, Michael; Klötzer, Hans-Martin; Kirchsteiger, Harald; Eikmeier, Heino; del Re, Luigi

    2013-07-01

    Even though a Clinical and Laboratory Standards Institute proposal exists on the design of studies and performance criteria for continuous glucose monitoring (CGM) systems, it has not yet led to a consistent evaluation of different systems, as no consensus has been reached on the reference method to evaluate them or on acceptance levels. As a consequence, performance assessment of CGM systems tends to be inconclusive, and a comparison of the outcome of different studies is difficult. Published information and available data (as presented in this issue of Journal of Diabetes Science and Technology by Freckmann and coauthors) are used to assess the suitability of several frequently used methods [International Organization for Standardization, continuous glucose error grid analysis, mean absolute relative deviation (MARD), precision absolute relative deviation (PARD)] when assessing performance of CGM systems in terms of accuracy and precision. The combined use of MARD and PARD seems to allow for better characterization of sensor performance. The use of different quantities for calibration and evaluation, e.g., capillary blood using a blood glucose (BG) meter versus venous blood using a laboratory measurement, introduces an additional error source. Using BG values measured in more or less large intervals as the only reference leads to a significant loss of information in comparison with the continuous sensor signal and possibly to an erroneous estimation of sensor performance during swings. Both can be improved using data from two identical CGM sensors worn by the same patient in parallel. Evaluation of CGM performance studies should follow an identical study design, including sufficient swings in glycemia. At least a part of the study participants should wear two identical CGM sensors in parallel. All data available should be used for evaluation, both by MARD and PARD, a good PARD value being a precondition to trust a good MARD value. Results should be analyzed and

  4. Compressed Air Energy Storage System Control and Performance Assessment Using Energy Harvested Index

    Directory of Open Access Journals (Sweden)

    Hanif SedighNejad

    2014-01-01

    Full Text Available In this paper a new concept for control and performance assessment of compressed air energy storage (CAES systems in a hybrid energy system is introduced. The proposed criterion, based on the concept of energy harvest index (HEI, measures the capability of a storage system to capture renewable energy. The overall efficiency of the CAES system and optimum control and design from the technical and economic point of view is presented. A possible application of this idea is an isolated community with significant wind energy resource. A case study reveals the usefulness of the proposed criterion in design, control and implementation of a small CAES system in a hybrid power system (HPM for an isolated community. Energy harvested index and its effectiveness in increasing the wind penetration rate in the total energy production is discussed.

  5. Performance assessment of earth pipe cooling system for low energy buildings in a subtropical climate

    International Nuclear Information System (INIS)

    Ahmed, S.F.; Khan, M.M.K.; Amanullah, M.T.O.; Rasul, M.G.; Hassan, N.M.S.

    2015-01-01

    Highlights: • Earth pipe cooling performance was investigated in a subtropical climate in Australia. • A thermal model was developed using Fluent to assess the cooling performance. • A temperature reduction of around 2 °C was found for the earth pipe cooling system. • Annual energy savings of maximum 866.54 kW (8.82%) was achieved for a 27.23 m"3 room. - Abstract: Energy consumption in heating and cooling around the world has been a major contributor to global warming. Hence, many studies have been aimed at finding new techniques to save and control energy through energy efficient measures. Most of this energy is used in residential, agricultural and commercial buildings. It is therefore important to adopt energy efficiency measures in these buildings through new technologies and novel building designs. These new building designs can be developed by employing various passive cooling systems. Earth pipe cooling is one of these which can assist to save energy without using any customary mechanical units. This paper investigates the earth pipe cooling performance in a hot humid subtropical climate of Rockhampton, Australia. A thermal model is developed using ANSYS Fluent for measuring its performance. Impacts of air velocity, air temperature, relative humidity and soil temperature on room cooling performance are also assessed. A temperature reduction of around 2 °C was found for the system. This temperature reduction contributed to an energy saving of a maximum of 866.54 kW (8.82%) per year for a 27.23 m"3 room.

  6. Assessment of the service performance of drainage system and transformation of pipeline network based on urban combined sewer system model.

    Science.gov (United States)

    Peng, Hai-Qin; Liu, Yan; Wang, Hong-Wu; Ma, Lu-Ming

    2015-10-01

    In recent years, due to global climate change and rapid urbanization, extreme weather events occur to the city at an increasing frequency. Waterlogging is common because of heavy rains. In this case, the urban drainage system can no longer meet the original design requirements, resulting in traffic jams and even paralysis and post a threat to urban safety. Therefore, it provides a necessary foundation for urban drainage planning and design to accurately assess the capacity of the drainage system and correctly simulate the transport effect of drainage network and the carrying capacity of drainage facilities. This study adopts InfoWorks Integrated Catchment Management (ICM) to present the two combined sewer drainage systems in Yangpu District, Shanghai (China). The model can assist the design of the drainage system. Model calibration is performed based on the historical rainfall events. The calibrated model is used for the assessment of the outlet drainage and pipe loads for the storm scenario currently existing or possibly occurring in the future. The study found that the simulation and analysis results of the drainage system model were reliable. They could fully reflect the service performance of the drainage system in the study area and provide decision-making support for regional flood control and transformation of pipeline network.

  7. Feature, Event, and Process Screening and Scenario Development for the Yucca Mountain Total System Performance Assessment

    International Nuclear Information System (INIS)

    Barnard, R.; Barr, G.; Burch, P.; Freeze, G.; Rechard, R.; Schenker, A.; Swift, P.

    1999-01-01

    Scenario development has two primary purposes in the design and documentation of post-closure performance assessments in a regulatory setting. First, scenario development ensures a sufficiently comprehensive consideration of the possible future states of the system. Second, scenario development identifies the important scenarios that must be considered in quantitative analyses of the total system performance assessment (TSPA). Section 2.0 of this report describes the scenario development process. Steps in the process are described in Section 2.1, and terms introduced in this section are defined in Section 2.2. The electronic database used to document the process is described in Section 3, and Section 4 provides a summary of the current status of the YMP scenario development work. Section 5 contains acknowledgments, and Section 6 contains a list of the references cited

  8. Annual Performance Assessment of Complex Fenestration Systems in Sunny Climates Using Advanced Computer Simulations

    Directory of Open Access Journals (Sweden)

    Chantal Basurto

    2015-12-01

    Full Text Available Complex Fenestration Systems (CFS are advanced daylighting systems that are placed on the upper part of a window to improve the indoor daylight distribution within rooms. Due to their double function of daylight redirection and solar protection, they are considered as a solution to mitigate the unfavorable effects due to the admission of direct sunlight in buildings located in prevailing sunny climates (risk of glare and overheating. Accordingly, an adequate assessment of their performance should include an annual evaluation of the main aspects relevant to the use of daylight in such regions: the indoor illuminance distribution, thermal comfort, and visual comfort of the occupant’s. Such evaluation is possible with the use of computer simulations combined with the bi-directional scattering distribution function (BSDF data of these systems. This study explores the use of available methods to assess the visible and thermal annual performance of five different CFS using advanced computer simulations. To achieve results, an on-site daylight monitoring was carried out in a building located in a predominantly sunny climate location, and the collected data was used to create and calibrate a virtual model used to carry-out the simulations. The results can be employed to select the CFS, which improves visual and thermal interior environment for the occupants.

  9. Web-based application on employee performance assessment using exponential comparison method

    Science.gov (United States)

    Maryana, S.; Kurnia, E.; Ruyani, A.

    2017-02-01

    Employee performance assessment is also called a performance review, performance evaluation, or assessment of employees, is an effort to assess the achievements of staffing performance with the aim to increase productivity of employees and companies. This application helps in the assessment of employee performance using five criteria: Presence, Quality of Work, Quantity of Work, Discipline, and Teamwork. The system uses the Exponential Comparative Method and Weighting Eckenrode. Calculation results using graphs were provided to see the assessment of each employee. Programming language used in this system is written in Notepad++ and MySQL database. The testing result on the system can be concluded that this application is correspond with the design and running properly. The test conducted is structural test, functional test, and validation, sensitivity analysis, and SUMI testing.

  10. Performance assessment of imaging plates for the JHR transfer Neutron Imaging System

    Science.gov (United States)

    Simon, E.; Guimbal, P. AB(; )

    2018-01-01

    The underwater Neutron Imaging System to be installed in the Jules Horowitz Reactor (JHR-NIS) is based on a transfer method using a neutron activated beta-emitter like Dysprosium. The information stored in the converter is to be offline transferred on a specific imaging system, still to be defined. Solutions are currently under investigation for the JHR-NIS in order to anticipate the disappearance of radiographic films commonly used in these applications. We report here the performance assessment of Computed Radiography imagers (Imaging Plates) performed at LLB/Orphée (CEA Saclay). Several imaging plate types are studied, in one hand in the configuration involving an intimate contact with an activated dysprosium foil converter: Fuji BAS-TR, Fuji UR-1 and Carestream Flex XL Blue imaging plates, and in the other hand by using a prototypal imaging plate doped with dysprosium and thus not needing any contact with a separate converter foil. The results for these imaging plates are compared with those obtained with gadolinium doped imaging plate used in direct neutron imaging (Fuji BAS-ND). The detection performances of the different imagers are compared regarding resolution and noise. The many advantages of using imaging plates over radiographic films (high sensitivity, linear response, high dynamic range) could palliate its lower intrinsic resolution.

  11. Assessing District Energy Systems Performance Integrated with Multiple Thermal Energy Storages

    Science.gov (United States)

    Rezaie, Behnaz

    The goal of this study is to examine various energy resources in district energy (DE) systems and then DE system performance development by means of multiple thermal energy storages (TES) application. This study sheds light on areas not yet investigated precisely in detail. Throughout the research, major components of the heat plant, energy suppliers of the DE systems, and TES characteristics are separately examined; integration of various configurations of the multiple TESs in the DE system is then analysed. In the first part of the study, various sources of energy are compared, in a consistent manner, financially and environmentally. The TES performance is then assessed from various aspects. Then, TES(s) and DE systems with several sources of energy are integrated, and are investigated as a heat process centre. The most efficient configurations of the multiple TESs integrated with the DE system are investigated. Some of the findings of this study are applied on an actual DE system. The outcomes of this study provide insight for researchers and engineers who work in this field, as well as policy makers and project managers who are decision-makers. The accomplishments of the study are original developments TESs and DE systems. As an original development the Enviro-Economic Function, to balance the economic and environmental aspects of energy resources technologies in DE systems, is developed; various configurations of multiple TESs, including series, parallel, and general grid, are developed. The developed related functions are discharge temperature and energy of the TES, and energy and exergy efficiencies of the TES. The TES charging and discharging behavior of TES instantaneously is also investigated to obtain the charging temperature, the maximum charging temperature, the charging energy flow, maximum heat flow capacity, the discharging temperature, the minimum charging temperature, the discharging energy flow, the maximum heat flow capacity, and performance

  12. Performance Assessment of a Communicable Disease Surveillance System in Response to the Twin Earthquakes of East Azerbaijan.

    Science.gov (United States)

    Babaie, Javad; Ardalan, Ali; Vatandoost, Hasan; Goya, Mohammad Mehdi; Akbari Sari, Ali

    2015-08-01

    Following the twin earthquakes on August 11, 2012, in the East Azerbaijan province of Iran, the provincial health center set up a surveillance system to monitor communicable diseases. This study aimed to assess the performance of this surveillance system. In this quantitative-qualitative study, performance of the communicable diseases surveillance system was assessed by using the updated guidelines of the Centers for Disease Control and Prevention (CDC). Qualitative data were collected through interviews with the surveillance system participants, and quantitative data were obtained from the surveillance system. The surveillance system was useful, simple, representative, timely, and flexible. The data quality, acceptability, and stability of the surveillance system were 65.6%, 10.63%, and 100%, respectively. The sensitivity and positive predictive value were not calculated owing to the absence of a gold standard. The surveillance system satisfactorily met the goals expected for its setup. The data obtained led to the control of communicable diseases in the affected areas. Required interventions based on the incidence of communicable disease were designed and implemented. The results also reassured health authorities and the public. However, data quality and acceptability should be taken into consideration and reviewed for implementation in future disasters.

  13. Estimates of mean consequences and confidence bounds on the mean associated with low-probability seismic events in total system performance assessments

    International Nuclear Information System (INIS)

    Pensado, Osvaldo; Mancillas, James

    2007-01-01

    An approach is described to estimate mean consequences and confidence bounds on the mean of seismic events with low probability of breaching components of the engineered barrier system. The approach is aimed at complementing total system performance assessment models used to understand consequences of scenarios leading to radionuclide releases in geologic nuclear waste repository systems. The objective is to develop an efficient approach to estimate mean consequences associated with seismic events of low probability, employing data from a performance assessment model with a modest number of Monte Carlo realizations. The derived equations and formulas were tested with results from a specific performance assessment model. The derived equations appear to be one method to estimate mean consequences without having to use a large number of realizations. (authors)

  14. TURVA-2012: Performance assessment

    International Nuclear Information System (INIS)

    Hellae, Pirjo; Snellman, Margit; Marcos, Nuria; Pastina, Barbara; Smith, Paul; Koskinen, Kari

    2014-01-01

    TURVA-2012 is Posiva's safety case in support of the Preliminary Safety Analysis Report (PSAR) and application for a construction licence for a repository for disposal of spent nuclear fuel at the Olkiluoto site in south-western Finland. Posiva's safety concept is based on long-term isolation and containment, which is achieved through a robust engineered barrier system (EBS) design and favourable geological conditions at the repository site. The reference design considered in the TURVA-2012 safety case is the KBS-3V design, with the EBS consisting of a copper-iron canister, a buffer of swelling clay material, a backfill in the deposition tunnels of low-permeability material and closure of the central tunnels and other underground openings. The host rock acts as a natural barrier. Each barrier contributes to safety through one or more safety function. The conditions needed for the barriers to fulfil their respective safety functions are expressed in terms of performance targets for the EBS and the target properties for the host rock. The performance assessment (Posiva, 2013), which is a key component of TURVA-2012, analyses the ability of the repository system to provide containment and isolation of the spent nuclear fuel during the long-term evolution of the system and the site. The conditions needed for the barriers to fulfil their respective safety functions are expressed in terms of performance targets for the engineered barriers and target properties for the host rock, for example properties related to the corrosion resistance and mechanical strength of the canister as well as groundwater flow and composition. The analyses take into account the uncertainties in the initial state, the subsequent thermal, hydraulic, mechanical and chemical evolution of the repository system and uncertainties in the evolution. The conclusions of the performance assessment are based mostly on the output of key modelling activities. Whenever modelling is not possible the conclusions

  15. Statistical analysis in MSW collection performance assessment.

    Science.gov (United States)

    Teixeira, Carlos Afonso; Avelino, Catarina; Ferreira, Fátima; Bentes, Isabel

    2014-09-01

    The increase of Municipal Solid Waste (MSW) generated over the last years forces waste managers pursuing more effective collection schemes, technically viable, environmentally effective and economically sustainable. The assessment of MSW services using performance indicators plays a crucial role for improving service quality. In this work, we focus on the relevance of regular system monitoring as a service assessment tool. In particular, we select and test a core-set of MSW collection performance indicators (effective collection distance, effective collection time and effective fuel consumption) that highlights collection system strengths and weaknesses and supports pro-active management decision-making and strategic planning. A statistical analysis was conducted with data collected in mixed collection system of Oporto Municipality, Portugal, during one year, a week per month. This analysis provides collection circuits' operational assessment and supports effective short-term municipality collection strategies at the level of, e.g., collection frequency and timetables, and type of containers. Copyright © 2014 Elsevier Ltd. All rights reserved.

  16. An overview of performance assessment methodology

    International Nuclear Information System (INIS)

    Hongnian Jow

    2010-01-01

    The definition of performance assessment (PA) within the context of a geologic repository program is a post-closure safety assessment; a system analysis of hazards associated with the facility and the ability of the site and the design of the facility to provide for the safety functions. For the last few decades, PA methodology bas been developed and applied to different waste disposal programs around the world. PA has been used in the safety analyses for waste disposal repositories for low-level waste, intermediate level waste, and high-level waste including spent nuclear fuels. This paper provides an overview of the performance assessment methodology and gives examples of its applications for the Yucca Mountain Project. (authors)

  17. Performance of arthroscopic irrigation systems assessed with automatic blood detection

    NARCIS (Netherlands)

    Tuijthof, G. J. M.; de Vaal, M. M.; Sierevelt, I. N.; Blankevoort, L.; van der List, M. P. J.

    2011-01-01

    During arthroscopies, bleeding episodes occur as a result of tissue damage. Irrigation systems assist in minimizing these disturbances. The performance of three arthroscopic irrigation systems in clearing bleeding episodes was evaluated objectively. One surgeon performed 99 shoulder arthroscopies

  18. Power performance assessment. Final report

    International Nuclear Information System (INIS)

    Frandsen, S.

    1998-12-01

    In the increasingly commercialised wind power marketplace, the lack of precise assessment methods for the output of an investment is becoming a barrier for wider penetration of wind power. Thus, addressing this problem, the overall objectives of the project are to reduce the financial risk in investment in wind power projects by significantly improving the power performance assessment methods. Ultimately, if this objective is successfully met, the project may also result in improved tuning of the individual wind turbines and in optimisation methods for wind farm operation. The immediate, measurable objectives of the project are: To prepare a review of existing contractual aspects of power performance verification procedures of wind farms; to provide information on production sensitivity to specific terrain characteristics and wind turbine parameters by analyses of a larger number of wind farm power performance data available to the proposers; to improve the understanding of the physical parameters connected to power performance in complex environment by comparing real-life wind farm power performance data with 3D computational flow models and 3D-turbulence wind turbine models; to develop the statistical framework including uncertainty analysis for power performance assessment in complex environments; and to propose one or more procedures for power performance evaluation of wind power plants in complex environments to be applied in contractual agreements between purchasers and manufacturers on production warranties. Although the focus in this project is on power performance assessment the possible results will also be of benefit to energy yield forecasting, since the two tasks are strongly related. (au) JOULE III. 66 refs.; In Co-operation Renewable Energy System Ltd. (GB); Centre for Renewable Energy (GR); Aeronautic Research Centre (SE); National Engineering Lab. (GB); Public Power Cooperation (GR)

  19. Outline of performance assessment study on geological isolation system in Japan

    International Nuclear Information System (INIS)

    Masuda, S.; Umeki, H.; Ishiguro, K.; Suzuki, A.

    1990-01-01

    This paper discusses the goals of current R and D activities which are to ensure the feasibility of geological isolation of HLW in japan and then to establish the social acceptance. The strategic plan for overall performance assessment is examined. The plan includes scenario development by systematic approach and consequence analysis in which the emphasis of developing simulation models are mainly placed on near-field phenomena. Recent developments in performance assessment have been summarized

  20. Academic performance in terms of the applied assessment system

    Directory of Open Access Journals (Sweden)

    Arribas, José María

    2012-05-01

    Full Text Available This paper examines the academic performance depending on the evaluation and rating system used in the university. The sample under study consists of 30 subjects -taught by 35 professors to 2192 students from 7 different degrees at 14 universities of all Spain-. The results confirm that continuous assessment is the one that best results not only in terms of rate of return and success rate but also in terms of grades. En este trabajo se estudia el rendimiento académico en función del sistema de evaluación y calificación empleado en el ámbito universitario. La muestra objeto de estudio está formada por 30 asignaturas -impartidas por 35 profesores a 2192 alumnos de 7 titulaciones diferentes en 14 universidades de toda España-. Los resultados obtenidos confirman que la evaluación continua es la que propicia los mejores resultados no solo en cuanto a la Tasa de Rendimiento y a la Tasa de Éxito, sino también en cuanto a las calificaciones obtenidas.

  1. Total-System Analyzer for performance assessment of Yucca Mountain

    International Nuclear Information System (INIS)

    Wilson, M.L.; Lauffer, F.C.; Cummings, J.C.; Zieman, N.B.

    1990-01-01

    The Total-System Analyzer is a modular computer program for probabilistic total-system performance calculations. The code employs stratified random sampling from model parameter distribution functions to generate multiple realizations of the system. The results of flow and transport calculations for each realization are combined into a probability distribution function of the system response as indicated by the performance measure. We give a detailed description of the code and present results for four example problems simulating the release of radionuclides from a proposed high-level-waste repository at Yucca Mountain, Nevada. The example simulations illustrate the impact of significant variation of percolation flux and sorption on radionuclide releases. We discuss the effects of numerical sampling error and of correlations among the model parameters. 20 refs., 7 figs., 2 tabs

  2. Including Performance Assessments in Accountability Systems: A Review of Scale-Up Efforts

    Science.gov (United States)

    Tung, Rosann

    2010-01-01

    The purpose of this literature and field review is to understand previous efforts at scaling up performance assessments for use across districts and states. Performance assessments benefit students and teachers by providing more opportunities for students to demonstrate their knowledge and complex skills, by providing teachers with better…

  3. A unified model for energy and environmental performance assessment of natural gas-fueled poly-generation systems

    International Nuclear Information System (INIS)

    Chicco, Gianfranco; Mancarella, Pierluigi

    2008-01-01

    Poly-generation systems for combined production of manifold energy vectors such as electricity, heat at different enthalpy levels (for instance, in the form of hot water and steam), and cooling power from a unique source of primary energy (typically natural gas) are increasingly spreading, above all on a small-scale basis (below 1 MW e ), owing to their enhanced energy, environmental and economic characteristics. Availability of suitable tools for assessing the performance of such systems is therefore fundamental. In this paper, a unified general model is proposed for assessing the energy and CO 2 emission performance of any type of poly-generation system with natural gas as the energy input. In particular, the classical energy saving model for cogeneration systems is extended to include in the analysis further energy vectors by defining the novel PPES (Poly-generation Primary Energy Saving) indicator. In addition, equivalent efficiencies for CO 2 emission assessment are defined and used in the formulation of the new PCO2ER (Poly-generation CO 2 Emission Reduction) indicator, specifically introduced for environmental analysis. The formal analogy between the PPES and the PCO2ER indicators is highlighted. Numerical applications are provided to show the effectiveness of the proposed models and to quantify the typical benefits that poly-generation systems can bring. In particular, the new indicators are of relevant interest for both energy planners and policy makers, above all in the outlook of formulating financial incentive strategies, as it already occurs for cogeneration systems, or of participating to specific energy-related markets such as the ones for trading white certificates or emission allowances

  4. Performance Monitoring Applied to System Supervision

    Directory of Open Access Journals (Sweden)

    Bertille Somon

    2017-07-01

    Full Text Available Nowadays, automation is present in every aspect of our daily life and has some benefits. Nonetheless, empirical data suggest that traditional automation has many negative performance and safety consequences as it changed task performers into task supervisors. In this context, we propose to use recent insights into the anatomical and neurophysiological substrates of action monitoring in humans, to help further characterize performance monitoring during system supervision. Error monitoring is critical for humans to learn from the consequences of their actions. A wide variety of studies have shown that the error monitoring system is involved not only in our own errors, but also in the errors of others. We hypothesize that the neurobiological correlates of the self-performance monitoring activity can be applied to system supervision. At a larger scale, a better understanding of system supervision may allow its negative effects to be anticipated or even countered. This review is divided into three main parts. First, we assess the neurophysiological correlates of self-performance monitoring and their characteristics during error execution. Then, we extend these results to include performance monitoring and error observation of others or of systems. Finally, we provide further directions in the study of system supervision and assess the limits preventing us from studying a well-known phenomenon: the Out-Of-the-Loop (OOL performance problem.

  5. Improved thermal source term generation capability for use in performance assessment and system studies

    International Nuclear Information System (INIS)

    King, J.; Rhodes, C.

    1994-01-01

    This paper describes work performed by the Civilian Radioactive Waste Management System (CRWMS) Management and Operating (M ampersand O) Contractor to improve spent nuclear fuel (SNF) waste stream characterization for system studies. It discusses how these new capabilities may be exploited for thermal source term generation for use in repository performance assessment modeling. SNF historical discharges have been exhaustively tracked, and significant effort has gone into capturing, verifying, and electronically managing spent fuel inventory data. Future discharge projections are produced annually by the Energy Information Administration (EIA) using sophisticated computer models. The output of these models is coupled with annually updated SNF historical discharges to produce what is referred to as the open-quotes reactor database.close quotes This database and related data are published in a variety of ways including on magnetic media for consistent use by analysts or other interested parties

  6. Power probability density function control and performance assessment of a nuclear research reactor

    International Nuclear Information System (INIS)

    Abharian, Amir Esmaeili; Fadaei, Amir Hosein

    2014-01-01

    Highlights: • In this paper, the performance assessment of static PDF control system is discussed. • The reactor PDF model is set up based on the B-spline functions. • Acquaints of Nu, and Th-h. equations solve concurrently by reformed Hansen’s method. • A principle of performance assessment is put forward for the PDF of the NR control. - Abstract: One of the main issues in controlling a system is to keep track of the conditions of the system function. The performance condition of the system should be inspected continuously, to keep the system in reliable working condition. In this study, the nuclear reactor is considered as a complicated system and a principle of performance assessment is used for analyzing the performance of the power probability density function (PDF) of the nuclear research reactor control. First, the model of the power PDF is set up, then the controller is designed to make the power PDF for tracing the given shape, that make the reactor to be a closed-loop system. The operating data of the closed-loop reactor are used to assess the control performance with the performance assessment criteria. The modeling, controller design and the performance assessment of the power PDF are all applied to the control of Tehran Research Reactor (TRR) power in a nuclear process. In this paper, the performance assessment of the static PDF control system is discussed, the efficacy and efficiency of the proposed method are investigated, and finally its reliability is proven

  7. Performance assessment strategy for low-level waste disposal sites

    International Nuclear Information System (INIS)

    Starmer, R.J.; Deering, L.G.; Weber, M.F.

    1988-01-01

    This paper describes US Nuclear Regulatory Commission (NRC) staff views on predicting the performance of low-level radioactive waste disposal facilities. Under the Atomic Energy Act, as amended, and the Low Level Radioactive Waste Policy Act, as amended, the NRC and Agreement States license land disposal of low-level radioactive waste (LLW) using the requirements in 10 CFR Part 61 or comparable state requirements. The purpose of this paper is to briefly describe regulatory requirements for performance assessment in low-level waste licensing, a strategy for performance assessments to support license applications, and NRC staff licensing evaluation of performance assessments. NRC's current activities in developing a performance assessment methodology will provide an overall systems modeling approach for assessing the performance of LLW disposal facilities. NRC staff will use the methodology to evaluate performance assessments conducted by applicants for LLW disposal facilities. The methodology will be made available to states and other interested parties

  8. The role of performance assessment in radioactive waste disposal

    International Nuclear Information System (INIS)

    Stenhouse, M.J.

    1998-01-01

    Performance assessment has many applications in the field of radioactive waste management, none more important than demonstrating the suitability of a particular repository system for waste disposal. The role of performance assessment in radioactive waste disposal is discussed with reference to assessments performed in civilian waste management programmes. The process is, however, relevant, and may be applied directly to the disposal of defence-related wastes. When used in an open and transparent manner, performance assessment is a powerful methodology not only for convincing the authorities of the safety of a disposal concept, but also for gaining the wider acceptance of the general public for repository siting. 26 refs

  9. Pakistan, Sindh Province - Baseline Indicators System : Baseline Procurement Performance Assessment Report

    OpenAIRE

    World Bank

    2009-01-01

    This document provides an assessment of the public procurement system in Sindh province using the baseline indicators system developed by the Development Assistance Committee of the Organization for Economic Cooperation and Development (OECD-DAC). This assessment, interviews and discussions were held with stakeholders from the public and private sectors as well as civil society. Developing...

  10. Bridge Performance Assessment Based on an Adaptive Neuro-Fuzzy Inference System with Wavelet Filter for the GPS Measurements

    Directory of Open Access Journals (Sweden)

    Mosbeh R. Kaloop

    2015-10-01

    Full Text Available This study describes the performance assessment of the Huangpu Bridge in Guangzhou, China based on long-term monitoring in real-time by the kinematic global positioning system (RTK-GPS technique. Wavelet transformde-noising is applied to filter the GPS measurements, while the adaptive neuro-fuzzy inference system (ANFIS time series output-only model is used to predict the deformations of GPS-bridge monitoring points. In addition, GPS and accelerometer monitoring systems are used to evaluate the bridge oscillation performance. The conclusions drawn from investigating the numerical results show that: (1the wavelet de-noising of the GPS measurements of the different recording points on the bridge is a suitable tool to efficiently eliminate the signal noise and extract the different deformation components such as: semi-static and dynamic displacements; (2 the ANFIS method with two multi-input single output model is revealed to powerfully predict GPS movement measurements and assess the bridge deformations; and (3 The installed structural health monitoring system and the applied ANFIS movement prediction performance model are solely sufficient to assure bridge safety based on the analyses of the different filtered movement components.

  11. Performance assessment of EMR systems based on post-relational database.

    Science.gov (United States)

    Yu, Hai-Yan; Li, Jing-Song; Zhang, Xiao-Guang; Tian, Yu; Suzuki, Muneou; Araki, Kenji

    2012-08-01

    Post-relational databases provide high performance and are currently widely used in American hospitals. As few hospital information systems (HIS) in either China or Japan are based on post-relational databases, here we introduce a new-generation electronic medical records (EMR) system called Hygeia, which was developed with the post-relational database Caché and the latest platform Ensemble. Utilizing the benefits of a post-relational database, Hygeia is equipped with an "integration" feature that allows all the system users to access data-with a fast response time-anywhere and at anytime. Performance tests of databases in EMR systems were implemented in both China and Japan. First, a comparison test was conducted between a post-relational database, Caché, and a relational database, Oracle, embedded in the EMR systems of a medium-sized first-class hospital in China. Second, a user terminal test was done on the EMR system Izanami, which is based on the identical database Caché and operates efficiently at the Miyazaki University Hospital in Japan. The results proved that the post-relational database Caché works faster than the relational database Oracle and showed perfect performance in the real-time EMR system.

  12. Methodology used for total system performance assessment of the potential nuclear waste repository at yucca mountain (USA)

    International Nuclear Information System (INIS)

    Devonec, E.; Sevougian, S.D.; Mattie, P.D.; Mcneish, J.A.; Mishra, S.

    2001-01-01

    The U.S. Department of Energy and its contractors are currently evaluating a site in Nevada (Yucca Mountain) for disposal of high-level radioactive waste from U.S. commercial nuclear plants and U.S. government-owned facilities. The suitability of the potential geologic repository is assessed, based on its performance in isolating the nuclear waste from the environment. Experimental data and models representing the natural and engineered barriers are combined into a Total System Performance Assessment (TSPA) model. Because of the uncertainty in the current data and in the future evolution of the total system, simulations follow a probabilistic approach. Multiple realization simulations using Monte Carlo analysis are conducted over time periods of up to one million years, which estimates a range of possible behaviors of the repository. In addition to the nominal scenario, other exposure scenarios include the possibility of disruptive events such as volcanic eruption or intrusion, or accidental human intrusion. Sensitivity to key uncertain processes is analyzed. The influence of stochastic variables on the TSPA model output is assessed by ''uncertainty importance analysis'', e.g., regression analysis and classification tree analysis. Further investigation of the impact of parameters and assumptions is conducted through ''one-off analysis'', which consists in fixing a parameter at a particular value, using an alternative conceptual model, or in making a different assumption. Finally, robustness analysis evaluates the performance of the repository when various natural or engineered barriers are assumed to be degraded. The objective of these analyses is to evaluate the performance of the potential repository system under conditions ranging from expected to highly unlikely, though physically possible conditions. (author)

  13. Methodology used for total system performance assessment of the potential nuclear waste repository at yucca mountain (USA)

    Energy Technology Data Exchange (ETDEWEB)

    Devonec, E.; Sevougian, S.D.; Mattie, P.D.; Mcneish, J.A. [Duke Engineering and Services, Town Center Drive, Las Vegas (United States); Mishra, S. [Duke Engineering and Services, Austin, TX (United States)

    2001-07-01

    The U.S. Department of Energy and its contractors are currently evaluating a site in Nevada (Yucca Mountain) for disposal of high-level radioactive waste from U.S. commercial nuclear plants and U.S. government-owned facilities. The suitability of the potential geologic repository is assessed, based on its performance in isolating the nuclear waste from the environment. Experimental data and models representing the natural and engineered barriers are combined into a Total System Performance Assessment (TSPA) model. Because of the uncertainty in the current data and in the future evolution of the total system, simulations follow a probabilistic approach. Multiple realization simulations using Monte Carlo analysis are conducted over time periods of up to one million years, which estimates a range of possible behaviors of the repository. In addition to the nominal scenario, other exposure scenarios include the possibility of disruptive events such as volcanic eruption or intrusion, or accidental human intrusion. Sensitivity to key uncertain processes is analyzed. The influence of stochastic variables on the TSPA model output is assessed by ''uncertainty importance analysis'', e.g., regression analysis and classification tree analysis. Further investigation of the impact of parameters and assumptions is conducted through ''one-off analysis'', which consists in fixing a parameter at a particular value, using an alternative conceptual model, or in making a different assumption. Finally, robustness analysis evaluates the performance of the repository when various natural or engineered barriers are assumed to be degraded. The objective of these analyses is to evaluate the performance of the potential repository system under conditions ranging from expected to highly unlikely, though physically possible conditions. (author)

  14. TSPA 1991: An initial total-system performance assessment for Yucca Mountain

    International Nuclear Information System (INIS)

    Barnard, R.W.; Wilson, M.L.; Dockery, H.A.; Kaplan, P.G.; Eaton, R.R.; Bingham, F.W.; Gauthier, J.H.; Robey, T.H.

    1992-07-01

    This report describes an assessment of the long-term performance of a repository system that contains deeply buried highly radioactive waste; the system is assumed to be located at the potential site at Yucca Mountain, Nevada. The study includes an identification of features, events, and processes that might affect the potential repository, a construction of scenarios based on this identification, a selection of models describing these scenarios (including abstraction of appropriate models from detailed models), a selection of probability distributions for the parameters in the models, a stochastic calculation of radionuclide releases for the scenarios, and a derivation of complementary cumulative distribution functions (CCDFs) for the releases. Releases and CCDFs are calculated for four categories of scenarios: aqueous flow (modeling primarily the existing conditions at the site, with allowances for climate change), gaseous flow, basaltic igneous activity, and human intrusion. The study shows that models of complex processes can be abstracted into more simplified representations that preserve the understanding of the processes and produce results consistent with those of more complex models

  15. Assessing the influence of reactor system design criteria on the performance of model colon fermentation units.

    Science.gov (United States)

    Moorthy, Arun S; Eberl, Hermann J

    2014-04-01

    Fermentation reactor systems are a key platform in studying intestinal microflora, specifically with respect to questions surrounding the effects of diet. In this study, we develop computational representations of colon fermentation reactor systems as a way to assess the influence of three design elements (number of reactors, emptying mechanism, and inclusion of microbial immobilization) on three performance measures (total biomass density, biomass composition, and fibre digestion efficiency) using a fractional-factorial experimental design. It was determined that the choice of emptying mechanism showed no effect on any of the performance measures. Additionally, it was determined that none of the design criteria had any measurable effect on reactor performance with respect to biomass composition. It is recommended that model fermentation systems used in the experimenting of dietary effects on intestinal biomass composition be streamlined to only include necessary system design complexities, as the measured performance is not benefited by the addition of microbial immobilization mechanisms or semi-continuous emptying scheme. Additionally, the added complexities significantly increase computational time during simulation experiments. It was also noted that the same factorial experiment could be directly adapted using in vitro colon fermentation systems. Copyright © 2013 The Society for Biotechnology, Japan. Published by Elsevier B.V. All rights reserved.

  16. Performance Assessment of Intelligence, Surveillance, and Reconnaissance (ISR) Enterprise Workflows

    National Research Council Canada - National Science Library

    Hurley, M. B; Jones, P. B

    2007-01-01

    ... on how to assess the performance of these systems. The framework delineates how measurements from laboratory tests, operational experiments, and field deployments can be analyzed to produce accurate, quantitative descriptions of system performance...

  17. The Rating System for Assessing the Performance of Employees in Terms of the Quality Assurance of Activity of Educational Organization

    Directory of Open Access Journals (Sweden)

    Stankevych Iryna V.

    2017-09-01

    Full Text Available The article is aimed at improving and developing a rating system for assessment of employees, in particular scientific and pedagogical workers, as an instrument to ensure the quality of activity of educational organization. The author has substantiated that a rating system both encourages the activities of higher education workers to provide quality training to higher education applicants and coordinates their efforts to raise the level of loyalty to the educational organization of consumers together with other parties interested, as well as to enhance its image in the market for educational services. The development of a rating system for an employee’s performance, as proposed by the author, should be accomplished not only at the expense of the assessment indicators, but also of the incentive methods, both direct and indirect. The publication provides an example of the practical application of the provisions of the rating system for assessing the performance of employees of educational organization, as proposed by the author.

  18. Heavy ion fusion systems assessment - An overview

    International Nuclear Information System (INIS)

    Waganer, L.M.; Driemeyer, D.E.; Zuckerman, D.S.; Billman, K.W.

    1986-01-01

    A study is underway to evaluate the technical performance and economic attractiveness of linear induction-driven Heavy Ion Fusion (HIF) as an energy source for electrical power generation. This study is a cooperative effort of several national laboratories, universities, industrial contractors and the Electric Power Research Institute (EPRI) under the leadership of Los Alamos National Laboratory. McDonnell Douglas Astronautics Company, assisted by Titan Systems, Inc, has the responsibility to integrate the cost and performance models of the driver, reactor and balance of plant systems, evaluate different system options and assess the overall technical and economic performance of an HIF power plant. Individual system options have been designed and analyzed by the other participants in the DOE-sponsored parent study and are provided for system integration and evaluation. This paper describes the integration and evaluation effort for the HIF Systems Assessment. Specific areas discussed include, the definition of Systems Requirements, the development of Assessment Methodology, the characterization of System Options, the description of Systems Assessment Code, the assessment of Code Results, the ranking of System Options, the selection of Attractive System Options, and the determination of Preferred Operating Parameter Space. The initial study effort was to define the system requirements from the standpoint of the overall power plant. This was accomplished by establishing overall power plant performance goals and specifications. The plant was assumed to be dedicated only to electrical power production in the 2020 time frame enabling the study to look beyond developmental and startup difficulties. The net plant output was defined to be between 400 and 1500 MWe which would allow investigating the effect of plant size

  19. NRC performance assessment program

    International Nuclear Information System (INIS)

    Coplan, S.M.

    1986-01-01

    The U.S. Nuclear Regulatory Commission's (NRC) performance assessment program includes the development of guidance to the U.S. Department of Energy (DOE) on preparation of a license application and on conducting the studies to support a license application. The nature of the licensing requirements of 10 CFR Part 60 create a need for performance assessments by the DOE. The NRC and DOE staffs each have specific roles in assuring the adequacy of those assessments. Performance allocation is an approach for determining what testing and analysis will be needed during site characterization to assure that an adequate data base is available to support the necessary performance assessments. From the standpoint of establishing is implementable methodology, the most challenging performance assessment needed for licensing is the one that will be used to determine compliance with the U.S. Environmental Protection Agency's (EPA) containment requirement

  20. Performance assessment - risk assessment vive la differences

    International Nuclear Information System (INIS)

    Nitschke, R.L.

    1997-01-01

    In the sister worlds of radioactive waste management disposal and environmental restoration, there are two similar processes and computational approaches for determining the acceptability of the proposed activities. While similar, these two techniques can lead to confusion and misunderstanding if the differences are not recognized and appreciated. In the case of radioactive waste management, the performance assessment process is used to determine compliance with certain prescribed 'performance objectives'. These objectives are designed to ensure that the disposal of radioactive (high-level, low-level, and/or transuranic) waste will be protective of human health and the environment. The environmental link is primarily through assuring protection of the groundwater as a resource. In the case of environmental restoration, the risk assessment process is used to determine the proper remedial action response, if any, for a past hazardous waste release. The process compares the 'no action' or 'leave as is' option with both carcinogenic and noncarcinogenic values for human health to determine the need for any action and to help to help determine just what the appropriate action would need to be. The impacts to the ecological system are evaluated in a slightly, different but similar fashion. Now the common objectives between these two processes notwithstanding. There are some key and fundamental differences that need to be answered that make direct comparisons or a common approach inappropriate. Failure to recognize this can lead to confusion and misunderstanding. This can be particularly problematic when one is faced with an active disposal facility located within the boundaries of an environmental restoration site as is the case at the Idaho National Engineering Laboratory (INEL). Through a critical evaluation of the performance assessment and risk assessment processes, highlighting both similarities and differences, it is hoped that greater understanding and appreciation

  1. Energy performance assessment methodology

    Energy Technology Data Exchange (ETDEWEB)

    Platzer, W.J. [Fraunhofer Inst. for Solar Energy Systems, Freiburg (Germany)

    2006-01-15

    The energy performance of buildings are intimately connected to the energy performance of building envelopes. The better we understand the relation between the quality of the envelope and the energy consumption of the building, the better we can improve both. We have to consider not only heating but all service energies related to the human comfort in the building, such as cooling, ventilation, lighting as well. The complexity coming from this embracing approach is not to be underestimated. It is less and less possible to realted simple characteristic performance indicators of building envelopes (such as the U-value) to the overall energy performance. On the one hand much more paramters (e.g. light transmittance) come into the picture we have to assess the product quality in a multidimensional world. Secondly buildings more and more have to work on a narrow optimum: For an old, badly insulated building all solar gains are useful for a high-performance building with very good insulation and heat recovery systems in the ventilation overheating becomes more likely. Thus we have to control the solar gains, and sometimes we need high gains, sometimes low ones. And thirdly we see that the technology within the building and the user patterns and interactions as well influence the performance of a building envelope. The aim of this project within IEA Task27 was to improve our knowledge on the complex situation and also to give a principal approach how to assess the performance of the building envelope. The participants have contributed to this aim not pretending that we have reached the end. (au)

  2. The Effects of Performance-Based Assessment Criteria on Student Performance and Self-Assessment Skills

    Science.gov (United States)

    Fastre, Greet Mia Jos; van der Klink, Marcel R.; van Merrienboer, Jeroen J. G.

    2010-01-01

    This study investigated the effect of performance-based versus competence-based assessment criteria on task performance and self-assessment skills among 39 novice secondary vocational education students in the domain of nursing and care. In a performance-based assessment group students are provided with a preset list of performance-based…

  3. System Analysis and Risk Assessment system (SARA) Version 4.0

    International Nuclear Information System (INIS)

    Sattison, M.B.; Russell, K.D.; Skinner, N.L.

    1992-01-01

    This NUREG is the tutorial for the System Analysis and Risk Assessment System (SARA) Version 4.0, a microcomputer-based system used to analyze the safety issues of a family [i.e., a power plant, a manufacturing facility, any facility on which a probabilistic risk assessment (PRA) might be performed]. A series of lessons are provided that walk the user through some basic steps common to most analyses performed with SARA. The example problems presented in the lessons build on one another, and in combination, lead the user through all aspects of SARA sensitivity analysis

  4. PERFORMANCE ASSESSMENT FOR FIELD SPORTS

    Directory of Open Access Journals (Sweden)

    Christopher Carling

    2009-03-01

    Full Text Available DESCRIPTION The book covers the various sport science assessment procedures for sports such as soccer, rugby, field hockey and lacrosse. It provides detailed and clear information about laboratory and field-based methods that can be used to assess and improve both individual and team performance. PURPOSE The book aims to provide a contemporary reference tool for selection of appropriate testing procedures for sports across a range of scientific disciplines. FEATURES The text begins with a chapter on the rationales for performance assessments, the use of technology and the necessity for procedures to conform to scientific rigor, explaining the importance of test criteria. This chapter ends by emphasizing the importance of the feedback process and vital considerations for the practitioner when interpreting the data, selecting which information is most important and how to deliver this back to the athlete or coach in order to deliver a positive performance outcome. The next two chapters focus on psychological assessments with respect to skill acquisition, retention and execution providing a variety of qualitative and quantitative options, underpinned with scientific theory and contextualized in order to improve the understanding of the application of these methods to improve anticipation and decision-making to enhance game intelligence.Chapter 4 provides coverage of match analysis techniques in order to make assessments of technical, tactical and physical performances. Readers learn about a series of methodologies ranging from simplistic pen and paper options through to sophisticated technological systems with some exemplar data also provided. Chapters 5 through 7 cover the physiological based assessments, including aerobic, anaerobic and anthropometric procedures. Each chapter delivers a theoretical opening section before progressing to various assessment options and the authors make great efforts to relate to sport-specific settings. The final

  5. A preliminary assessment of financial stability, efficiency, health systems and health outcomes using performance-based contracts in Belize.

    Science.gov (United States)

    Bowser, Diana M; Figueroa, Ramon; Natiq, Laila; Okunogbe, Adeyemi

    2013-01-01

    Over the last 10 years, Belize has implemented a National Health Insurance (NHI) program that uses performance-based contracts with both public and private facilities to improve financial sustainability, efficiency and service provision. Data were collected at the facility, district and national levels in order to assess trends in financial sustainability, efficiency payments, year-end bonuses and health system and health outcomes. A difference-in-difference approach was used to assess the difference in technical efficiency between private and public facilities. The results show that per capita spending on services provided by the NHI program has decreased over the period 2006-2009 from BZ$177 to BZ$136. The private sector has achieved higher levels of technical efficiency, but lower percentages of efficiency and year-end bonus payments. Districts with contracts through the NHI program showed greater improvements in facility births, nurse density, reducing maternal mortality, diabetes deaths and morbidity from bronchitis, emphysema and asthma than districts without contracts over the period 2006-2010. This preliminary assessment of Belize's pay-for-performance system provides some positive results, however further research is needed to use the lessons learned from Belize to implement similar reforms in other systems.

  6. 10 CFR 63.114 - Requirements for performance assessment.

    Science.gov (United States)

    2010-01-01

    ... processes of engineered barriers in the performance assessment, including those processes that would adversely affect the performance of natural barriers. Degradation, deterioration, or alteration processes of... surrounding region to the extent necessary, and information on the design of the engineered barrier system...

  7. Feature, event, and process screening and scenario development for the yucca mountain total system performance assessment

    International Nuclear Information System (INIS)

    Swift, P.; Barr, G.; Barnard, R.; Rechard, R.; Schenker, A.; Freeze, G.; Burck, P.

    2001-01-01

    Scenario development has two primary purposes in the design and documentation of postclosure performance assessments in a regulatory setting. First, scenario development ensures a sufficiently comprehensive consideration of the possible future states of the system. Second, scenario development identifies the important scenarios that must be considered in quantitative analyses of the total system performance assessment (TSPA). To ensure clear documentation of the treatment of potentially relevant future states of the system in the Yucca Mountain license application (LA), the US Department of Energy (DOE) has chosen to adopt a scenario development process based on the methodology developed by Cranwell et al. (1990) for the US Nuclear Regulatory Commission (NRC). Although the process, described below, has been modified somewhat as a result of experience gained in the last decade, the underlying methodology is consistent with that outlined by the DOE in the 1988 Site Characterization Plan for the Yucca Mountain Project (YMP) (U.S. DOE, 1988). The approach is fundamentally the same as that used in many performance assessments, including the most recent analysis of the Yucca Mountain repository by the NRC (Wescott et al., 1995). The approach has also been used by the DOE for the Waste Isolation Pilot Plant (WIPP) (U.S. DOE, 1996), by the Nuclear Energy Agency (NEA) of the Organisation for Economic Co-Operation and Development (OECD), and by other radioactive waste programs internationally. Section 2.0 of this report describes the scenario development process. Steps in the process are described in Section 2.1, and terms introduced in this section are defined in Section 2.2. The electronic database used to document the process is described in Section 3, and Section 4 provides a summary of the current status of the YMP scenario development work. Section 5 contains acknowledgments, and Section 6 contains a list of the references cited. (authors)

  8. Assessing the performance of Taiwan’s environmental protection system with a non-radial network DEA approach

    International Nuclear Information System (INIS)

    Huang, Chin-wei; Chiu, Yung-ho; Fang, Wei-ta; Shen, Neng

    2014-01-01

    Previous studies involving environmental performance purely focus on analyzing environmental or waste treatment efficiencies. This study combines various aspects of environmental protection and establishes a non-radial network DEA approach to evaluate the performance of an environmental protection system. The empirical methodology assumes that the system consists of three stages: administrative, executive processes, and protection effectiveness. The executive process includes waste treatment and pollution auditing divisions. In addition to assessing efficiencies, the empirical evaluation further explores the internal and external influences on performances and contributes implications and suggestions for environmental policy makers. The proposed model is utilized to gauge the performance of an environmental protection system for 20 municipalities in Taiwan. The results indicate the following: (1) for improving environmental quality, the government needs to put forth greater efforts in environmental audits; (2) improving productivity per unit so as to increase achievements in the executive process is more important for raising performance on environmental work, in addition to increasing workers and equipment for environmental protection; (3) a high degree of industrialization negatively influences administrative efficiency and educated residents have a greater comprehension for administrative operations, which can help in efficient budget utilization. - Highlights: • A non-radial network DEA approach to evaluate the Performance of Environmental Protection System. • The performance of waste treatment performs better than the efficiency of auditing. • Governmental expenditure is more efficiently utilized in the administrative process. • The effectiveness of achieved protection is a critical indicator for revealing environmental quality in a region

  9. INITIAL SINGLE-SHELL TANK (SST) SYSTEM PERFORMANCE ASSESSMENT OF THE HANFORD SITE

    International Nuclear Information System (INIS)

    JARAYSI, M.N.

    2007-01-01

    The ''Initial Single-Shell Tank System Performance Assessment for the Hanford Site [1] (SST PA) presents the analysis of the long-term impacts of residual wastes assumed to remain after retrieval of tank waste and closure of the SST farms at the US Department of Energy (DOE) Hanford Site. The SST PA supports key elements of the closure process agreed upon in 2004 by DOE, the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA). The SST PA element is defined in Appendix I of the ''Hanford Federal Facility Agreement and Consent Order'' (HFFACO) (Ecology et al. 1989) [2], the document that establishes the overall closure process for the SST and double-shell tank (DST) systems. The approach incorporated in the SST PA integrates substantive features of both hazardous and radioactive waste management regulations into a single analysis. The defense-in-depth approach used in this analysis defined two major engineering barriers (a surface barrier and the grouted tank structure) and one natural barrier (the vadose zone) that will be relied on to control waste release into the accessible environment and attain expected performance metrics. The analysis evaluates specific barrier characteristics and other site features that influence contaminant migration by the various pathways. A ''reference'' case and a suite of sensitivity/uncertainty cases are considered. The ''reference case'' evaluates environmental impacts assuming central tendency estimates of site conditions. ''Reference'' case analysis results show residual tank waste impacts on nearby groundwater, air resources; or inadvertent intruders to be well below most important performance objectives. Conversely, past releases to the soil, from previous tank farm operations, are shown to have groundwater impacts that re significantly above most performance objectives. Sensitivity/uncertainty cases examine single and multiple parameter variability along with plausible alternatives

  10. Methodology Used for Total System Performance Assessment of the Potential Nuclear Waste Repository at Yucca Mountain (USA)

    International Nuclear Information System (INIS)

    E. Devibec; S.D. Sevougian; P.D. Mattie; J.A. McNeish; S. Mishra

    2001-01-01

    The U.S. Department of Energy and its contractors are currently evaluating a site in Nevada (Yucca Mountain) for disposal of high-level radioactive waste from U.S. commercial nuclear plants and U.S. government-owned facilities. The suitability of the potential geologic repository is assessed, based on its performance in isolating the nuclear waste from the environment. Experimental data and models representing the natural and engineered barriers are combined into a Total System Performance Assessment (TSPA) model [1]. Process models included in the TSPA model are unsaturated zone flow and transport, thermal hydrology, in-drift geochemistry, waste package degradation, waste form degradation, engineered barrier system transport, saturated zone flow and transport, and biosphere transport. Because of the uncertainty in the current data and in the future evolution of the total system, simulations follow a probabilistic approach. Multiple realization simulations using Monte Carlo analysis are conducted over time periods of up to one million years, which estimates a range of possible behaviors of the repository. The environmental impact is measured primarily by the annual dose received by an average member of a critical population group residing 20 km down-gradient of the potential repository. In addition to the nominal scenario, other exposure scenarios include the possibility of disruptive events such as volcanic eruption or intrusion, or accidental human intrusion. Sensitivity to key uncertain processes is analyzed. The influence of stochastic variables on the TSPA model output is assessed by ''uncertainty importance analysis'', e.g., regression analysis and classification tree analysis. Further investigation of the impact of parameters and assumptions is conducted through ''one-off analysis'', which consists in fixing a parameter at a particular value, using an alternative conceptual model, or in making a different assumption. Finally, robustness analysis evaluates

  11. 24 CFR 115.206 - Performance assessments; Performance standards.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Performance assessments; Performance standards. 115.206 Section 115.206 Housing and Urban Development Regulations Relating to Housing... AGENCIES Certification of Substantially Equivalent Agencies § 115.206 Performance assessments; Performance...

  12. Building Confidence in LLW Performance Assessments - 13386

    Energy Technology Data Exchange (ETDEWEB)

    Rustick, Joseph H.; Kosson, David S.; Krahn, Steven L.; Clarke, James H. [Vanderbilt University, Department of Civil and Environmental Engineering and Consortium for Risk Evaluation with Stakeholder Participation, Nashville, Tennessee, 37235 (United States)

    2013-07-01

    The performance assessment process and incorporated input assumptions for four active and one planned DOE disposal sites were analyzed using a systems approach. The sites selected were the Savannah River E-Area Slit and Engineered Trenches, Hanford Integrated Disposal Facility, Idaho Radioactive Waste Management Complex, Oak Ridge Environmental Management Waste Management Facility, and Nevada National Security Site Area 5. Each disposal facility evaluation incorporated three overall system components (1) site characteristics (climate, geology, geochemistry, etc.), (2) waste properties (waste form and package), and (3) engineered barrier designs (cover system, liner system). Site conceptual models were also analyzed to identity the main risk drivers and risk insights controlling performance for each disposal facility. (authors)

  13. Building Confidence in LLW Performance Assessments - 13386

    International Nuclear Information System (INIS)

    Rustick, Joseph H.; Kosson, David S.; Krahn, Steven L.; Clarke, James H.

    2013-01-01

    The performance assessment process and incorporated input assumptions for four active and one planned DOE disposal sites were analyzed using a systems approach. The sites selected were the Savannah River E-Area Slit and Engineered Trenches, Hanford Integrated Disposal Facility, Idaho Radioactive Waste Management Complex, Oak Ridge Environmental Management Waste Management Facility, and Nevada National Security Site Area 5. Each disposal facility evaluation incorporated three overall system components (1) site characteristics (climate, geology, geochemistry, etc.), (2) waste properties (waste form and package), and (3) engineered barrier designs (cover system, liner system). Site conceptual models were also analyzed to identity the main risk drivers and risk insights controlling performance for each disposal facility. (authors)

  14. Clinical performance of two visual scoring systems in detecting and assessing activity status of occlusal caries in primary teeth

    DEFF Research Database (Denmark)

    Braga, M M; Ekstrand, K R; Martignon, S

    2010-01-01

    This study aimed to compare the clinical performance of two sets of visual scoring criteria for detecting caries severity and assessing caries activity status in occlusal surfaces. Two visual scoring systems--the Nyvad criteria (NY) and the ICDAS-II including an adjunct system for lesion activity...

  15. Performance assessment of topologically diverse power systems subjected to hurricane events

    International Nuclear Information System (INIS)

    Winkler, James; Duenas-Osorio, Leonardo; Stein, Robert; Subramanian, Devika

    2010-01-01

    Large tropical cyclones cause severe damage to major cities along the United States Gulf Coast annually. A diverse collection of engineering and statistical models are currently used to estimate the geographical distribution of power outage probabilities stemming from these hurricanes to aid in storm preparedness and recovery efforts. Graph theoretic studies of power networks have separately attempted to link abstract network topology to transmission and distribution system reliability. However, few works have employed both techniques to unravel the intimate connection between network damage arising from storms, topology, and system reliability. This investigation presents a new methodology combining hurricane damage predictions and topological assessment to characterize the impact of hurricanes upon power system reliability. Component fragility models are applied to predict failure probability for individual transmission and distribution power network elements simultaneously. The damage model is calibrated using power network component failure data for Harris County, TX, USA caused by Hurricane Ike in September of 2008, resulting in a mean outage prediction error of 15.59% and low standard deviation. Simulated hurricane events are then applied to measure the hurricane reliability of three topologically distinct transmission networks. The rate of system performance decline is shown to depend on their topological structure. Reliability is found to correlate directly with topological features, such as network meshedness, centrality, and clustering, and the compact irregular ring mesh topology is identified as particularly favorable, which can influence regional lifeline policy for retrofit and hardening activities to withstand hurricane events.

  16. Seismic performance assessment of base-isolated safety-related nuclear structures

    Science.gov (United States)

    Huang, Y.-N.; Whittaker, A.S.; Luco, N.

    2010-01-01

    Seismic or base isolation is a proven technology for reducing the effects of earthquake shaking on buildings, bridges and infrastructure. The benefit of base isolation has been presented in terms of reduced accelerations and drifts on superstructure components but never quantified in terms of either a percentage reduction in seismic loss (or percentage increase in safety) or the probability of an unacceptable performance. Herein, we quantify the benefits of base isolation in terms of increased safety (or smaller loss) by comparing the safety of a sample conventional and base-isolated nuclear power plant (NPP) located in the Eastern U.S. Scenario- and time-based assessments are performed using a new methodology. Three base isolation systems are considered, namely, (1) Friction Pendulum??? bearings, (2) lead-rubber bearings and (3) low-damping rubber bearings together with linear viscous dampers. Unacceptable performance is defined by the failure of key secondary systems because these systems represent much of the investment in a new build power plant and ensure the safe operation of the plant. For the scenario-based assessments, the probability of unacceptable performance is computed for an earthquake with a magnitude of 5.3 at a distance 7.5 km from the plant. For the time-based assessments, the annual frequency of unacceptable performance is computed considering all potential earthquakes that may occur. For both assessments, the implementation of base isolation reduces the probability of unacceptable performance by approximately four orders of magnitude for the same NPP superstructure and secondary systems. The increase in NPP construction cost associated with the installation of seismic isolators can be offset by substantially reducing the required seismic strength of secondary components and systems and potentially eliminating the need to seismically qualify many secondary components and systems. ?? 2010 John Wiley & Sons, Ltd.

  17. Cost and Performance Model for Photovoltaic Systems

    Science.gov (United States)

    Borden, C. S.; Smith, J. H.; Davisson, M. C.; Reiter, L. J.

    1986-01-01

    Lifetime cost and performance (LCP) model assists in assessment of design options for photovoltaic systems. LCP is simulation of performance, cost, and revenue streams associated with photovoltaic power systems connected to electric-utility grid. LCP provides user with substantial flexibility in specifying technical and economic environment of application.

  18. Performance Assessment of Dynaspeak Speech Recognition System on Inflight Databases

    National Research Council Canada - National Science Library

    Barry, Timothy

    2004-01-01

    .... To aid in the assessment of various commercially available speech recognition systems, several aircraft speech databases have been developed at the Air Force Research Laboratory's Human Effectiveness Directorate...

  19. Development of a Risk-Based Performance Assessment Method for Long-Term Cover Systems--Application to the Monticello Mill Tailings Repository

    International Nuclear Information System (INIS)

    HO, CLIFFORD K.; ARNOLD, BILL W.; COCHRAN, JOHN R.; WEBB, STEPHEN W.; TAIRA, RANDAL Y.

    2001-01-01

    A probabilistic, risk-based performance-assessment methodology is being developed to assist designers, regulators, and involved stakeholders in the selection, design, and monitoring of long-term covers for contaminated subsurface sites. This report presents an example of the risk-based performance-assessment method using a repository site in Monticello, Utah. At the Monticello site, a long-term cover system is being used to isolate long-lived uranium mill tailings from the biosphere. Computer models were developed to simulate relevant features, events, and processes that include water flux through the cover, source-term release, vadose-zone transport, saturated-zone transport, gas transport, and exposure pathways. The component models were then integrated into a total-system performance-assessment model, and uncertainty distributions of important input parameters were constructed and sampled in a stochastic Monte Carlo analysis. Multiple realizations were simulated using the integrated model to produce cumulative distribution functions of the performance metrics, which were used to assess cover performance for both present- and long-term future conditions. Performance metrics for this study included the water percolation reaching the uranium mill tailings, radon flux at the surface, groundwater concentrations, and dose. Results of this study can be used to identify engineering and environmental parameters (e.g., liner properties, long-term precipitation, distribution coefficients) that require additional data to reduce uncertainty in the calculations and improve confidence in the model predictions. These results can also be used to evaluate alternative engineering designs and to identify parameters most important to long-term performance

  20. Methods and Techniques Used to Convey Total System Performance Assessment Analyses and Results for Site Recommendation at Yucca Mountain, Nevada, USA

    International Nuclear Information System (INIS)

    Mattie, Patrick D.; McNeish, Jerry A.; Sevougian, S. David; Andrews, Robert W.

    2001-01-01

    Total System Performance Assessment (TSPA) is used as a key decision-making tool for the potential geologic repository of high level radioactive waste at Yucca Mountain, Nevada USA. Because of the complexity and uncertainty involved in a post-closure performance assessment, an important goal is to produce a transparent document describing the assumptions, the intermediate steps, the results, and the conclusions of the analyses. An important objective for a TSPA analysis is to illustrate confidence in performance projections of the potential repository given a complex system of interconnected process models, data, and abstractions. The methods and techniques used for the recent TSPA analyses demonstrate an effective process to portray complex models and results with transparency and credibility

  1. CITYkeys Smart city performance measurement system

    NARCIS (Netherlands)

    Huovila, A.; Airaksinen, M.; Pinto-Seppa, I.; Piira, K.; Bosch, P.R.; Penttinen, T.; Neumann, H.M.; Kontinakis, N.

    2017-01-01

    Cities are tackling their economic, social and environmental challenges through smart city solutions. To demonstrate that these solutions achieve the desired impact, an indicator-based assessment system is needed. This paper presents the process of developing CITYkeys performance measurement system

  2. Development of a monitoring instrument to assess the performance of the Swiss primary care system.

    Science.gov (United States)

    Ebert, Sonja T; Pittet, Valérie; Cornuz, Jacques; Senn, Nicolas

    2017-11-29

    The Swiss health system is customer-driven with fee-for-service paiement scheme and universal coverage. It is highly performing but expensive and health information systems are scarcely implemented. The Swiss Primary Care Active Monitoring (SPAM) program aims to develop an instrument able to describe the performance and effectiveness of the Swiss PC system. Based on a Literature review we developed a conceptual framework and selected indicators according to their ability to reflect the Swiss PC system. A two round modified RAND method with 24 inter-/national experts took place to select primary/secondary indicators (validity, clarity, agreement). A limited set of priority indicators was selected (importance, priority) in a third round. A conceptual framework covering three domains (structure, process, outcome) subdivided into twelve sections (funding, access, organisation/ workflow of resources, (Para-)Medical training, management of knowledge, clinical-/interpersonal care, health status, satisfaction of PC providers/ consumers, equity) was generated. 365 indicators were pre-selected and 335 were finally retained. 56 were kept as priority indicators.- Among the remaining, 199 were identified as primary and 80 as secondary indicators. All domains and sections are represented. The development of the SPAM program allowed the construction of a consensual instrument in a traditionally unregulated health system through a modified RAND method. The selected 56 priority indicators render the SPAM instrument a comprehensive tool supporting a better understanding of the Swiss PC system's performance and effectiveness as well as in identifying potential ways to improve quality of care. Further challenges will be to update indicators regularly and to assess validity and sensitivity-to-change over time.

  3. Tailored model abstraction in performance assessments

    International Nuclear Information System (INIS)

    Kessler, J.H.

    1995-01-01

    Total System Performance Assessments (TSPAs) are likely to be one of the most significant parts of making safety cases for the continued development and licensing of geologic repositories for the disposal of spent fuel and HLW. Thus, it is critical that the TSPA model capture the 'essence' of the physical processes relevant to demonstrating the appropriate regulation is met. But how much detail about the physical processes must be modeled and understood before there is enough confidence that the appropriate essence has been captured? In this summary the level of model abstraction that is required is discussed. Approaches for subsystem and total system performance analyses are outlined, and the role of best estimate models is examined. It is concluded that a conservative approach for repository performance, based on limited amount of field and laboratory data, can provide sufficient confidence for a regulatory decision

  4. THE NEED AND OPPORTUNITIES FOR PERFORMANCE ASSESSMENT IN HIGHER EDUCATION

    Directory of Open Access Journals (Sweden)

    Gabriella KECZER

    2007-01-01

    Full Text Available Motivating employees is one of the highly important areas of human resources management (HRM. As people are best motivated by their intention to satisfy their own needs, the task of HRM is to satisfy the employees’ need for remuneration in a fair and just manner. This can be achieved if an organization operates a formal and professional system of performance assessment. The importance of having such a system in place is further confirmed by the fact that six out of the seven large Hungarian corporations reviewed operate a global system of performance assessment. In areas where intellectual activity plays a dominant role, as is the case with higher education, omitting an evaluation of the performance of „white collar workers” is, of course, out of the question. Satisfying the employees’ need for fair remuneration in the public sphere, including higher education (HE, is essentially hindered by a lack of evaluating individual performance and, hence, performance-dependent wages and financial benefits derived from extra performance. Given the centrally determined and uniform wage schedule, there is almost no opportunity to differentiate between the performance of one person in a given wage category and another. This entails, at least for a large part of public employees and public servants, a lack of drive to perform better than average. These people could be forced to make greater efforts only by way of measuring their performance on an individual basis and applying a wage system that would rely on individual output and represent a system of wages that would be both differentiated and motivating. In the first part of my paper, I will present the performance assessment methods applied by the large Hungarian enterprises included in the investigation. The second part will deal with the issue of how all of this can be actually implemented in HE.

  5. An Examination of Pennsylvania's Classroom Diagnostic Testing as a Predictive Model of Pennsylvania System of School Assessment Performance

    Science.gov (United States)

    Matsanka, Christopher

    2017-01-01

    The purpose of this non-experimental quantitative study was to investigate the relationship between Pennsylvania's Classroom Diagnostic Tools (CDT) interim assessments and the state-mandated Pennsylvania System of School Assessment (PSSA) and to create linear regression equations that could be used as models to predict student performance on the…

  6. Thermodynamic analysis and performance assessment of an integrated heat pump system for district heating applications

    International Nuclear Information System (INIS)

    Soltani, Reza; Dincer, Ibrahim; Rosen, Marc A.

    2015-01-01

    A Rankine cycle-driven heat pump system is modeled for district heating applications with superheated steam and hot water as products. Energy and exergy analyses are performed, followed by parametric studies to determine the effects of varying operating conditions and environmental parameters on the system performance. The district heating section is observed to be the most inefficient part of system, exhibiting a relative irreversibility of almost 65%, followed by the steam evaporator and the condenser, with relative irreversibilities of about 18% and 9%, respectively. The ambient temperature is observed to have a significant influence on the overall system exergy destruction. As the ambient temperature decreases, the system exergy efficiency increases. The electricity generated can increase the system exergy efficiency at the expense of a high refrigerant mass flow rate, mainly due to the fact that the available heat source is low quality waste heat. For instance, by adding 2 MW of excess electricity on top of the targeted 6 MW of product heat, the refrigerant mass flow rate increases from 12 kg/s (only heat) to 78 kg/s (heat and electricity), while the production of 8 MW of product heat (same total output, but in form of heat) requires a refrigerant mass flow rate of only 16 kg/s. - Highlights: • A new integrated heat pump system is developed for district heating applications. • An analysis and assessment study is undertaken through exergy analysis methodology. • A comparative efficiency evaluation is performed for practical applications. • A parametric study is conducted to investigate how varying operating conditions and state properties affect energy and exergy efficiencies.

  7. Introduction to radiological performance assessment

    International Nuclear Information System (INIS)

    Moss, G.

    1995-02-01

    A radiological performance assessment is conducted to provide reasonable assurance that performance objectives for low-level radioactive waste (LLW) disposal will be met. Beginning in the early stages of development, a radiological performance assessment continues through the operational phase, and is instrumental in the postclosure of the facility. Fundamental differences exist in the regulation of commercial and defense LLW, but the radiological performance assessment process is essentially the same for both. The purpose of this document is to describe that process in a concise and straightforward manner. This document focuses on radiological performance assessment as it pertains to commercial LLW disposal, but is applicable to US Department of Energy sites as well. Included are discussions on performance objectives, site characterization, and how a performance assessment is conducted. A case study is used to illustrate how the process works as a whole. A bibliography is provided to assist in locating additional information

  8. A “Grammar” for assessing the performance of power-supply systems: Comparing nuclear energy to fossil energy

    International Nuclear Information System (INIS)

    Diaz-Maurin, François; Giampietro, Mario

    2013-01-01

    This article illustrates an innovative approach for the characterization and comparison of the performance of power-supply systems. The concept of ‘grammar’ forces to declare the pre-analytical decisions about: (i) semantic and formal categories used for the accounting – primary energy sources (PES), energy carriers (EC), and production factors; (ii) the set of functional and structural elements of the power-supply system included in the analysis. After having tamed the systemic ambiguity associated with energy accounting, it becomes possible to generate a double assessment referring to: (i) external constraints – the consumption of PES and the generation of waste and pollution; and (ii) internal constraints – the requirements of production factors such as human labor, power capacity, internal consumption of EC for making EC. The case study provided compares the production of EC (electricity) with “nuclear energy” and “fossil energy”. When considering internal constraints, nuclear energy requires about twice as much power capacity (5.9–9.5 kW/GWh vs. 2.6–2.9 kW/GWh) and 5–8 times more labor (570–640 h/GWh vs. 80–115 h/GWh). Things do not improve for nuclear energy when looking at external constraints – e.g. the relative scarcity of PES. This may explain the difficulties faced by nuclear energy to gain interest from investors. -- Highlights: ► A new approach to assess the performance of power-supply systems is provided. ► A biophysical analysis of the production process is based on the concept of grammar. ► A grammar is capable of handling the inherent ambiguity associated with energy. ► The performance of nuclear energy and fossil energy is compared using this grammar. ► Nuclear energy demonstrates a lower performance than fossil energy in making electricity.

  9. Hardware performance assessment recommendations and tools for baropodometric sensor systems

    Directory of Open Access Journals (Sweden)

    Claudia Giacomozzi

    2010-06-01

    Full Text Available Accurate plantar pressure measurements are mandatory in both clinical and research contexts. Differences in accuracy, precision, reliability of pressure measurement devices (PMDs prevented so far the onset of standardization processes and of reliable reference datasets. The Italian National Institute of Health (ISS approved and conducted a scientific project aimed to design, validate and implement dedicated testing methods for both in-factory and on-the-field PMD assessment. A general-purpose experimental set-up was built, complete and suitable for the assessment of PMDs based on different sensor technology, electronic conditioning and mechanical solutions. Preliminary assessments have been conducted on 5 commercial PMDs. The study lead to the definition of: i an appropriate set of instruments and procedures for PMD technical assessment; ii a minimum set of significant parameters for the technical characterization of the PMD performance; iii some recommendations to both manufacturers and end users for an appropriate use in clinics and in research context

  10. Traditional formwork system sustainability performance: experts’ opinion

    Science.gov (United States)

    Taher Al-ashwal, Mohammed; Abdullah, Redzuan; Zakaria, Rozana

    2017-11-01

    The traditional formwork system is one of the commonly used systems in concrete construction. It is considered as one of the least observed activities in term of sustainability performance. In this paper, the sustainability performance of the traditional formwork has been assessed by using a multi-criteria assessment tool to facilitate the decision on the sustainability performance measurement. A quantitative five Likert scale survey study using judgemental sampling is employed in this study. A sample of 93 of engineering construction experts, with different fields including contractors, developers, and consultants in the Malaysian context has made the body of the collected primary data. The results show variety in the distribution of the respondents’ working experience. The sustainability performance is considered moderately sustainable by the experts with only given 40.24 % of the overall total score for the three sustainable categories namely environmental, social and economic. Despite the finding that shows that the economic pillar was rated as the most sustainable aspect in comparison to the environmental and social pillars the traditional formwork system sustainability still needs enhancement. Further incorporation of the social and environmental pillars into the concrete construction the sustainability performance of traditional formwork system could be improved.

  11. [Teaching performance assessment in Public Health employing three different strategies].

    Science.gov (United States)

    Martínez-González, Adrián; Moreno-Altamirano, Laura; Ponce-Rosas, Efrén Raúl; Martínez-Franco, Adrián Israel; Urrutia-Aguilar, María Esther

    2011-01-01

    The educational system depends upon the quality and performance of their faculty and should therefore be process of continuous improvement. To assess the teaching performance of the Public Health professors, at the Faculty of Medicine, UNAM through three strategies. Justification study. The evaluation was conducted under a mediational model through three strategies: students' opinion assessment, self-assessment and students' academic achievement. We applied descriptive statistics, Student t test, ANOVA and Pearson correlation. Twenty professors were evaluated from the Public Health department, representing 57% of all them who teach the subject. The professor's performance was highly valued self-assessment compared with assessment of student opinion, was confirmed by statistical analysis the difference was significant. The difference amongst the three evaluation strategies became more evident between self-assessment and the scores obtained by students in their academic achievement. The integration of these three strategies offers a more complete view of the teacher's performance quality. Academic achievement appears to be a more objective strategy for teaching performance assessment than students' opinion and self-assessment.

  12. State of the art on power performance assessments for wind energy conversion systems

    Energy Technology Data Exchange (ETDEWEB)

    Maribo Pedersen, B. [ed.

    1997-12-31

    It is the intention of this meeting to clarify the status of power performance verification and assessment and identify the future needs in terms of applications, research fields and standardization actions, putting emphasis on the following items: Power performance verification for wind farms; Power performance verification for large wind turbines; Power performance verification for wind turbines operating in complex terrain; Assessment of the available international and national standards; Assessment of developed, applied and verified tools for WECS power performance. This Experts Meeting had gathered 14 participants from 6 different countries. 12 presentations were given and although countries with a sizeable wind program, ie. Italy, UK and Spain were not present, it is felt that the meeting gave a fair impression of the contemporary state of the art world wide. Specific problems concerning accurate definition and measurement of wind speed by cup-anemometers were dealt with. Different sources of errors were analysed and valuable new experimental results were presented. Other instruments for wind-speed measurements than cup-anemometers were discussed as well. (EG)

  13. Selection of a computer code for Hanford low-level waste engineered-system performance assessment

    International Nuclear Information System (INIS)

    McGrail, B.P.; Mahoney, L.A.

    1995-10-01

    Planned performance assessments for the proposed disposal of low-level waste (LLW) glass produced from remediation of wastes stored in underground tanks at Hanford, Washington will require calculations of radionuclide release rates from the subsurface disposal facility. These calculations will be done with the aid of computer codes. Currently available computer codes were ranked in terms of the feature sets implemented in the code that match a set of physical, chemical, numerical, and functional capabilities needed to assess release rates from the engineered system. The needed capabilities were identified from an analysis of the important physical and chemical process expected to affect LLW glass corrosion and the mobility of radionuclides. The highest ranked computer code was found to be the ARES-CT code developed at PNL for the US Department of Energy for evaluation of and land disposal sites

  14. Performance assessment of two whole-lake acoustic positional telemetry systems - is reality mining of free-ranging aquatic animals technologically possible?

    DEFF Research Database (Denmark)

    Baktoft, Henrik; Zajicek, Petr; Klefoth, Thomas

    2015-01-01

    Acoustic positional telemetry systems (APTs) represent a novel approach to study the behaviour of free ranging aquatic animals in the wild at unprecedented detail. System manufactures promise remarkably high temporal and spatial resolution. However, the performance of APTs has rarely been...... rigorously tested at the level of entire ecosystems. Moreover, the effect of habitat structure on system performance has only been poorly documented. Two APTs were deployed to cover two small lakes and a series of standardized stationary tests were conducted to assess system performance. Furthermore...... for stationary transmitters due to accumulation of small tracking errors, moving transmitters can result in both over-and underestimation of distances depending on circumstances. Both deployed APTs were capable of providing high resolution positional data at the scale of entire lakes and are suitable systems...

  15. Performance Measurement Systems in Swedish Health Care Services

    OpenAIRE

    Kollberg, Beata

    2007-01-01

    In the quality management literature, measurements are attributed great importance in improving products and processes. Systems for performance measurement assessing financial and non-financial measurements were developed in the late 1980s and early 1990s. The research on performance measurement systems has mainly been focused on the design of different performance measurement systems. Many authors are occupied with the study of the constructs of measures and developing prescriptive models of...

  16. Performance evaluation of real time radiographic systems

    International Nuclear Information System (INIS)

    Venkatraman, B.; Saravanan, S.; Jayakumar, T.; Kalyanasundaram, P.; Baldev Raj

    1996-01-01

    The Real Time Radiography (RTR) system can be studied completely by knowing the modulation transfer function (MTF) of the whole system. The MTF curve is a special form of contrast/detail-size diagram in which the image contrast is plotted against the spatial frequency of a test object measured in line-pairs per millimetre (lp/mm). MTF curves are widely used to measure the characteristics of optical equipment, particularly for assessing the contribution of individual items in a complex imaging transfer system. Codes of practice indicate that the image intensifier systems should be checked periodically to assess its performance through the use of MTF curves and step wedges for contrast ratio. Authors, instead, suggest the use of performance curves which are simple to obtain and can be easily interpreted by radiographers. (author)

  17. Technology Performance Level Assessment Methodology.

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, Jesse D.; Bull, Diana L; Malins, Robert Joseph; Costello, Ronan Patrick; Aurelien Babarit; Kim Nielsen; Claudio Bittencourt Ferreira; Ben Kennedy; Kathryn Dykes; Jochem Weber

    2017-04-01

    The technology performance level (TPL) assessments can be applied at all technology development stages and associated technology readiness levels (TRLs). Even, and particularly, at low TRLs the TPL assessment is very effective as it, holistically, considers a wide range of WEC attributes that determine the techno-economic performance potential of the WEC farm when fully developed for commercial operation. The TPL assessment also highlights potential showstoppers at the earliest possible stage of the WEC technology development. Hence, the TPL assessment identifies the technology independent “performance requirements.” In order to achieve a successful solution, the entirety of the performance requirements within the TPL must be considered because, in the end, all the stakeholder needs must be achieved. The basis for performing a TPL assessment comes from the information provided in a dedicated format, the Technical Submission Form (TSF). The TSF requests information from the WEC developer that is required to answer the questions posed in the TPL assessment document.

  18. Equipment performance monitoring in NPP Krsko (Summarized system health report)

    International Nuclear Information System (INIS)

    Djetelic, N.; Cicvaric, D.

    2004-01-01

    Management common goal is safe, reliable, effective, acceptable to public and conservative/cautious operation of NPP Krsko. A set of programs, including Corrective Action Program, Performance Indicators, Operating Experience, Self Assessment and System Health Report, is developed to assist NPP Krsko management in fulfilling those goals. System Health Report is a tool that management can use to quickly assess how selected systems are performing, to determine where additional management attention is required and to determine if appropriate corrective actions have been established. Summarized System Health Report is developed for management's quick overview of systems status, important system malfunctions and problems as well as major changes from previous assessment period. Summarized Report contains nine sections: status difference including brief explanation, selected performance indicators, new equipment problems, functional failures, important problem analyses, action plan for systems with Potential Danger (RED) status, maintenance rule status overview and systems availability (planned and unplanned).(author)

  19. Modelling and performance assessment of an antenna-control system

    Science.gov (United States)

    Burrows, C. R.

    1982-03-01

    An assessment is made of a surveillance-radar control system designed to provide a sector-search capability and continuous control of antenna speed without unwanted torque-reaction on the supporting mast. These objectives are attained by utilizing regenerative braking, and control is exercised through Perbury CVTs. A detailed analysis of the system is given. The models derived for the Perbury CVTs supplement the qualitative data contained in earlier papers. Some results from a computer simulation are presented. Although the paper is concerned with a particular problem, the analysis of the CVTs, and the concept of using energy transfer to control large inertial loads, are of more general interest.

  20. Physical Protection System Upgrades - Optimizing for Performance and Cost

    International Nuclear Information System (INIS)

    Hicks, Mary Jane; Bouchard, Ann M.

    1999-01-01

    CPA--Cost and Performance Analysis--is an architecture that supports analysis of physical protection systems and upgrade options. ASSESS (Analytic System and Software for Evaluating Security Systems), a tool for evaluating performance of physical protection systems, currently forms the cornerstone for evaluating detection probabilities and delay times of the system. Cost and performance data are offered to the decision-maker at the systems level and to technologists at the path-element level. A new optimization engine has been attached to the CPA methodology to automate analyses of many combinations (portfolios) of technologies. That engine controls a new analysis sequencer that automatically modifies ASSESS PPS files (facility descriptions), automatically invokes ASSESS Outsider analysis and then saves results for post-processing. Users can constrain the search to an upper bound on total cost, to a lower bound on level of performance, or to include specific technologies or technology types. This process has been applied to a set of technology development proposals to identify those portfolios that provide the most improvement in physical security for the lowest cost to install, operate and maintain at a baseline facility

  1. The role of natural analogues in performance assessment

    International Nuclear Information System (INIS)

    Ewing, R.C.

    1992-01-01

    One of the unique and scientifically most challenging aspects of nuclear waste isolation is the extrapolation of short-term laboratory data (hours to years) to the long time periods (10 3 - 10 5 years) required by regulatory agencies for performance assessment. The direct verification of these extrapolations is not possible, but methods must be developed to demonstrate compliance with government regulations and to satisfy the lay public that there is a demonstrable and reasonable basis for accepting the long-term extrapolations. Natural systems provide perhaps the only means of partial verification, as well as data that may be used directly in the models that are used in the extrapolation. Natural systems provide data on very large spatial (m to km) and temporal (10 3 - 10 8 years) scales, and in highly complex terranes in which unknown synergisms may effect radionuclide migration. This paper reviews the application (and most importantly, the limitations) of data from natural analogue systems to the verification of performance assessments

  2. Performance assessment of gamma cameras. Part 1

    International Nuclear Information System (INIS)

    Elliot, A.T.; Short, M.D.; Potter, D.C.; Barnes, K.J.

    1980-11-01

    The Dept. of Health and Social Security and the Scottish Home and Health Dept. has sponsored a programme of measurements of the important performance characteristics of 15 leading types of gamma cameras providing a routine radionuclide imaging service in hospitals throughout the UK. Measurements have been made of intrinsic resolution, system resolution, non-uniformity, spatial distortion, count rate performance, sensitivity, energy resolution and shield leakage. The main aim of this performance assessment was to provide sound information to the NHS to ease the task of those responsible for the purchase of gamma cameras. (U.K.)

  3. Reliability assessment of Port Harcourt 33/11kv Distribution System ...

    African Journals Online (AJOL)

    This makes reliability studies an important task besides all the other analyses required for assessing the system performance. The paper presents an analytical approach in the reliability assessment of the Port Harcourt 33/11kV power distribution system. The assessment was performed with the 2009 power outage data ...

  4. Progress in Methodologies for the Assessment of Passive Safety System Reliability in Advanced Reactors. Results from the Coordinated Research Project on Development of Advanced Methodologies for the Assessment of Passive Safety Systems Performance in Advanced Reactors

    International Nuclear Information System (INIS)

    2014-09-01

    Strong reliance on inherent and passive design features has become a hallmark of many advanced reactor designs, including several evolutionary designs and nearly all advanced small and medium sized reactor (SMR) designs. Advanced nuclear reactor designs incorporate several passive systems in addition to active ones — not only to enhance the operational safety of the reactors but also to eliminate the possibility of serious accidents. Accordingly, the assessment of the reliability of passive safety systems is a crucial issue to be resolved before their extensive use in future nuclear power plants. Several physical parameters affect the performance of a passive safety system, and their values at the time of operation are unknown a priori. The functions of passive systems are based on basic physical laws and thermodynamic principals, and they may not experience the same kind of failures as active systems. Hence, consistent efforts are required to qualify the reliability of passive systems. To support the development of advanced nuclear reactor designs with passive systems, investigations into their reliability using various methodologies are being conducted in several Member States with advanced reactor development programmes. These efforts include reliability methods for passive systems by the French Atomic Energy and Alternative Energies Commission, reliability evaluation of passive safety system by the University of Pisa, Italy, and assessment of passive system reliability by the Bhabha Atomic Research Centre, India. These different approaches seem to demonstrate a consensus on some aspects. However, the developers of the approaches have been unable to agree on the definition of reliability in a passive system. Based on these developments and in order to foster collaboration, the IAEA initiated the Coordinated Research Project (CRP) on Development of Advanced Methodologies for the Assessment of Passive Safety Systems Performance in Advanced Reactors in 2008. The

  5. System Analysis and Risk Assessment (SARA) system

    International Nuclear Information System (INIS)

    Krantz, E.A.; Russell, K.D.; Stewart, H.D.; Van Siclen, V.S.

    1986-01-01

    Utilization of Probabilistic Risk Assessment (PRA) related information in the day-to-day operation of plant systems has, in the past, been impracticable due to the size of the computers needed to run PRA codes. This paper discusses a microcomputer-based database system which can greatly enhance the capability of operators or regulators to incorporate PRA methodologies into their routine decision making. This system is called the System Analysis and Risk Assessment (SARA) system. SARA was developed by EG and G Idaho, Inc. at the Idaho National Engineering Laboratory to facilitate the study of frequency and consequence analyses of accident sequences from a large number of light water reactors (LWRs) in this country. This information is being amassed by several studies sponsored by the United States Nuclear Regulatory Commission (USNRC). To meet the need of portability and accessibility, and to perform the variety of calculations necessary, it was felt that a microcomputer-based system would be most suitable

  6. Emission and economic performance assessment of a solid oxide fuel cell micro-combined heat and power system in a domestic building

    International Nuclear Information System (INIS)

    Elmer, Theo; Worall, Mark; Wu, Shenyi; Riffat, Saffa B.

    2015-01-01

    Combined heat and power (CHP) is a promising technological configuration for reducing energy consumption and increasing energy security in the domestic built environment. Fuel cells, on account of their: high electrical efficiency, low emissions and useful heat output have been identified as a key technological option for improving both building energy efficiency and reducing emissions in domestic CHP applications. The work presented in this paper builds upon results currently reported in the literature of fuel cells operating in domestic building applications, with an emission and economic performance assessment of a real, commercially available SOFC mCHP system operating in a real building; under a UK context. This paper aims to assess the emission and economic performance of a commercially available solid oxide fuel cell (SOFC) mCHP system, operating at The University of Nottingham's Creative Energy Homes. The performance assessment evaluates, over a one year period, the associated carbon (emission assessment) and operational costs (economic assessment) of the SOFC mCHP case compared to a ‘base case’ of grid electricity and a highly efficient gas boiler. Results from the annual assessment show that the SOFC mCHP system can generate annual emission reductions of up to 56% and cost reductions of 177% compared to the base case scenario. However support mechanisms such as; electrical export, feed in tariff and export tariff, are required in order to achieve this, the results are significantly less without. A net present value (NPV) analysis shows that the base case is still more profitable over a 15 year period, even though the SOFC mCHP system generates annual revenue; this is on account of the SOFC's high capital cost. In summary, grid interaction and incubator support is essential for significant annual emission and cost reductions compared to a grid electricity and gas boiler scenario. Currently capital cost is the greatest barrier to the economic

  7. Comparative Assessment of Thermal Performance of Existing Roof System and Retrofitted Green Roof System in Istanbul, Turkey

    Directory of Open Access Journals (Sweden)

    Nil TÜRKERİ

    2011-01-01

    Full Text Available Urban heat islands, temperature increase due to climate change and energy consumption due to high summer cooling load are significant issues in Turkey. International studies indicate that the green roof system serves as an energy efficient building technology. However, the thermal performance of green roofs when exposed to local climate conditions is still unknown in Turkey. A research project is being conducted at Istanbul Technical University, in which part of a low-slope existing roof system was retrofitted as an extensive green roof system and the thermal performances of both the existing roof and green roof were monitored in order to make a comparative assessment. Both the green roof and the existing roof were instrumented to measure the temperature profile within the roof systems and the solar reflectance of the roof surfaces. Local meteorological variables were also measured. Results obtained from the field monitoring revealed the following data. Reflected solar radiation from the green roof surface was slightly higher than from the existing roof surface. This was likely to be due to the fact that the plants had not yet covered the entire soil surface area of the green roof. Plants reduced the amount of heat absorbed by the growing medium during daytime through shading and reduced the surface temperature of the green roof. Ceiling temperatures of rooms under the existing roof and green roof indicated that heat transfer to the room beneath the green roof was reduced as well. The green roof reduced the heat gain due to the thermal mass of the soil. This created a buffer against daily fluctuations in temperature and minimized temperature extremes.

  8. Space station/base food system study. Volume 2: System assessments

    Science.gov (United States)

    1970-01-01

    The evaluation modeling technique is described which was used to combine the candidate element concepts into systems that meet mission requirements. Results of the assessment are presented in terms of systems performance data and plots of system trade-off data by highest ranking variable.

  9. Threshold Assessment and Performance Management: Modernizing or Masculinizing Teaching in England?

    Science.gov (United States)

    Mahony, Pat; Hextall, Ian; Menter, Ian

    2004-01-01

    The paper reports on aspects of an ESRC project, "The impact of Performance 'Threshold Assessment' on teachers' work" (ESRC R000239286). The paper begins by explaining the nature and technology of "Threshold Assessment," and its location nationally within the performance management system recently introduced into schools in England. We review the…

  10. performance assessment of substation site earthing using fluke ...

    African Journals Online (AJOL)

    2013-03-01

    Mar 1, 2013 ... Earthing is the fundamental requirement for protection in all electrical ... for the performance assessment of this instrument as compare to the conventional system. ... tem and the reference earth at a given operating fre- quency ...

  11. Performance Comparison of Adaptive Estimation Techniques for Power System Small-Signal Stability Assessment

    Directory of Open Access Journals (Sweden)

    E. A. Feilat

    2010-12-01

    Full Text Available This paper demonstrates the assessment of the small-signal stability of a single-machine infinite- bus power system under widely varying loading conditions using the concept of synchronizing and damping torques coefficients. The coefficients are calculated from the time responses of the rotor angle, speed, and torque of the synchronous generator. Three adaptive computation algorithms including Kalman filtering, Adaline, and recursive least squares have been compared to estimate the synchronizing and damping torque coefficients. The steady-state performance of the three adaptive techniques is compared with the conventional static least squares technique by conducting computer simulations at different loading conditions. The algorithms are compared to each other in terms of speed of convergence and accuracy. The recursive least squares estimation offers several advantages including significant reduction in computing time and computational complexity. The tendency of an unsupplemented static exciter to degrade the system damping for medium and heavy loading is verified. Consequently, a power system stabilizer whose parameters are adjusted to compensate for variations in the system loading is designed using phase compensation method. The effectiveness of the stabilizer in enhancing the dynamic stability over wide range of operating conditions is verified through the calculation of the synchronizing and damping torque coefficients using recursive least square technique.

  12. Performance Assessment of the CapitalBio Mycobacterium Identification Array System for Identification of Mycobacteria

    Science.gov (United States)

    Liu, Jingbo; Yan, Zihe; Han, Min; Han, Zhijun; Jin, Lingjie; Zhao, Yanlin

    2012-01-01

    The CapitalBio Mycobacterium identification microarray system is a rapid system for the detection of Mycobacterium tuberculosis. The performance of this system was assessed with 24 reference strains, 486 Mycobacterium tuberculosis clinical isolates, and 40 clinical samples and then compared to the “gold standard” of DNA sequencing. The CapitalBio Mycobacterium identification microarray system showed highly concordant identification results of 100% and 98.4% for Mycobacterium tuberculosis complex (MTC) and nontuberculous mycobacteria (NTM), respectively. The sensitivity and specificity of the CapitalBio Mycobacterium identification array for identification of Mycobacterium tuberculosis isolates were 99.6% and 100%, respectively, for direct detection and identification of clinical samples, and the overall sensitivity was 52.5%. It was 100% for sputum, 16.7% for pleural fluid, and 10% for bronchoalveolar lavage fluid, respectively. The total assay was completed in 6 h, including DNA extraction, PCR, and hybridization. The results of this study confirm the utility of this system for the rapid identification of mycobacteria and suggest that the CapitalBio Mycobacterium identification array is a molecular diagnostic technique with high sensitivity and specificity that has the capacity to quickly identify most mycobacteria. PMID:22090408

  13. A framework to assess management performance in district health systems: a qualitative and quantitative case study in Iran.

    Science.gov (United States)

    Tabrizi, Jafar Sadegh; Gholipour, Kamal; Iezadi, Shabnam; Farahbakhsh, Mostafa; Ghiasi, Akbar

    2018-01-01

    The aim was to design a district health management performance framework for Iran's healthcare system. The mixed-method study was conducted between September 2015 and May 2016 in Tabriz, Iran. In this study, the indicators of district health management performance were obtained by analyzing the 45 semi-structured surveys of experts in the public health system. Content validity of performance indicators which were generated in qualitative part were reviewed and confirmed based on content validity index (CVI). Also content validity ratio (CVR) was calculated using data acquired from a survey of 21 experts in quantitative part. The result of this study indicated that, initially, 81 indicators were considered in framework of district health management performance and, at the end, 53 indicators were validated and confirmed. These indicators were classified in 11 categories which include: human resources and organizational creativity, management and leadership, rules and ethics, planning and evaluation, district managing, health resources management and economics, community participation, quality improvement, research in health system, health information management, epidemiology and situation analysis. The designed framework model can be used to assess the district health management and facilitates performance improvement at the district level.

  14. A framework to assess management performance in district health systems: a qualitative and quantitative case study in Iran

    Directory of Open Access Journals (Sweden)

    Jafar Sadegh Tabrizi

    2018-04-01

    Full Text Available The aim was to design a district health management performance framework for Iran’s healthcare system. The mixed-method study was conducted between September 2015 and May 2016 in Tabriz, Iran. In this study, the indicators of district health management performance were obtained by analyzing the 45 semi-structured surveys of experts in the public health system. Content validity of performance indicators which were generated in qualitative part were reviewed and confirmed based on content validity index (CVI. Also content validity ratio (CVR was calculated using data acquired from a survey of 21 experts in quantitative part. The result of this study indicated that, initially, 81 indicators were considered in framework of district health management performance and, at the end, 53 indicators were validated and confirmed. These indicators were classified in 11 categories which include: human resources and organizational creativity, management and leadership, rules and ethics, planning and evaluation, district managing, health resources management and economics, community participation, quality improvement, research in health system, health information management, epidemiology and situation analysis. The designed framework model can be used to assess the district health management and facilitates performance improvement at the district level.

  15. Community Design Parameters and the Performance of Residential Cogeneration Systems

    Directory of Open Access Journals (Sweden)

    Hazem Rashed-Ali

    2012-11-01

    Full Text Available The integration of cogeneration systems in residential and mixed-use communities has the potential of reducing their energy demand and harmful emissions and can thus play asignificant role in increasing their environmental sustainability. This study investigated the impact of selected planning and architectural design parameters on the environmental and economic performances of centralized cogeneration systems integrated into residential communities in U.S.cold climates. Parameters investigated include: 1 density, 2 use mix, 3 street configuration, 4 housing typology, 5 envelope and building systems’ efficiencies, and 6 passive solar energyutilization. The study integrated several simulation tools into a procedure to assess the impact of each design parameter on the cogeneration system performance. This assessment procedure included: developing a base-line model representing typical design characteristics of U.S. residential communities; assessing the cogeneration system’s performance within this model using three performance indicators: percentage of reduction in primary energy use, percentage of reduction in CO2 emissions; and internal rate of return; assessing the impact of each parameter on the system performance through developing 46 design variations of the base-line model representing potential changes in each parameter and calculating the three indicators for each variation; and finally, using a multi-attribute decision analysis methodology to evaluate the relative impact of each parameter on the cogeneration system performance. The study results show that planning parameters had a higher impact on the cogeneration system performance than architectural ones. Also, a significant correlation was found between design characteristics identified as favorable for the cogeneration system performance and those of sustainable residential communities. These include high densities, high use mix, interconnected street networks, and mixing of

  16. User's guide for remote access of the Performance Assessment Center

    International Nuclear Information System (INIS)

    Peterson, C.R.; Kostelnik, K.M.

    1991-03-01

    The Performance Assessment Center (PAC) was established by the Department of Energy's National Low-Level Waste Management Program to provide technical assistance to support the development of low-level radioactive waste disposal facilities. This user's manual provides guidance to remote users of the PAC. Information is presented on how remote users may most effectively access and use the systems available at the Performance Assessment Center in Idaho Falls, Idaho. Access requirements and operating procedures are presented to assist the first-time PAC user. This manual also provides brief descriptions of each code available on the system

  17. Performance and environmental impact assessment of pulse detonation based engine systems

    Science.gov (United States)

    Glaser, Aaron J.

    Experimental research was performed to investigate the feasibility of using pulse detonation based engine systems for practical aerospace applications. In order to carry out this work a new pulse detonation combustion research facility was developed at the University of Cincinnati. This research covered two broad areas of application interest. The first area is pure PDE applications where the detonation tube is used to generate an impulsive thrust directly. The second focus area is on pulse detonation based hybrid propulsion systems. Within each of these areas various studies were performed to quantify engine performance. Comparisons of the performance between detonation and conventional deflagration based engine cycles were made. Fundamental studies investigating detonation physics and flow dynamics were performed in order to gain physical insight into the observed performance trends. Experimental studies were performed on PDE-driven straight and diverging ejectors to determine the system performance. Ejector performance was quantified by thrust measurements made using a damped thrust stand. The effects of PDE operating parameters and ejector geometric parameters on thrust augmentation were investigated. For all cases tested, the maximum thrust augmentation is found to occur at a downstream ejector placement. The optimum ejector geometry was determined to have an overall length of LEJECT/DEJECT =5.61, including an intermediate-straight section length of LSTRT /DEJECT=2, and diverging exhaust section with 4 deg half-angle. A maximum thrust augmentation of 105% was observed while employing the optimized ejector geometry and operating the PDE at a fill-fraction of 0.6 and a frequency of 10 Hz. When operated at a fill-fraction of 1.0 and a frequency of 30 Hz, the thrust augmentation of the optimized PDE-driven ejector system was observed to be 71%. Static pressure was measured along the interior surface of the ejector, including the inlet and exhaust sections. The

  18. 296-B-5 Stack monitoring and sampling system annual system assessment report

    International Nuclear Information System (INIS)

    Ridge, T.M.

    1995-02-01

    The B Plant Administration Manual requires an annual system assessment to evaluate and report the present condition of the sampling and monitoring system associated with Stack 296-B-5 at B Plant. The sampling and monitoring system associated with stack 296-B-5 is functional and performing satisfactorily. This document is an annual assessment report of the systems associated with the 296-B-5 stack

  19. The Waste Isolation Pilot Plant Performance Assessment Program

    International Nuclear Information System (INIS)

    Myers, J.; Coons, W.E.; Eastmond, R.; Morse, J.; Chakrabarti, S.; Zurkoff, J.; Colton, I.D.; Banz, I.

    1986-01-01

    The Waste Isolation Pilot Plant (WIPP) Performance Assessment Program involves a comprehensive analysis of the WIPP project with respect to the recently finalized Environmental Protection Agency regulations regarding the long-term geologic isolation of radioactive wastes. The performance assessment brings together the results of site characterization, underground experimental, and environmental studies into a rigorous determination of the performance of WIPP as a disposal system for transuranic radioactive waste. The Program consists of scenario development, geochemical, hydrologic, and thermomechanical support analyses and will address the specific containment and individual protection requirements specified in 40 CFR 191 sub-part B. Calculated releases from these interrelated analyses will be reported as an overall probability distribution of cumulative release resulting from all processes and events occurring over the 10,000 year post-closure period. In addition, results will include any doses to the public resulting from natural processes occurring over the 1,000 year post-closure period. The overall plan for the WIPP Performance Assessment Program is presented along with approaches to issues specific to the WIPP project

  20. The effects of performance-based assessment criteria on student performance and self-assessment skills

    NARCIS (Netherlands)

    Fastré, Greet; Van der Klink, Marcel; Van Merriënboer, Jeroen

    2010-01-01

    Fastré, G. M. J., Van der Klink, M. R., & Van Merriënboer, J. J. G. (2010). The effects of performance-based assessment criteria on student performance and self-assessment skills. Advances in Health Science Education, 15(4), 517-532.

  1. Total-system performance assessment for Yucca Mountain -- SNL second iteration (TSPA-1993)

    International Nuclear Information System (INIS)

    Wilson, M.L.; Barnard, R.W.; Gauthier, J.H.

    1994-04-01

    Sandia National Laboratories has completed the second iteration of the periodic total-system performance assessments (TSPA-93) for the Yucca Mountain Site Characterization Project (YMP). Scenarios describing expected conditions (aqueous and gaseous transport of contaminants) and low-probability events (human-intrusion drilling and volcanic intrusion) are modeled. The hydrologic processes modeled include estimates of the perturbations to ambient conditions caused by heating of the repository resulting from radioactive decay of the waste. TSPA-93 incorporates significant new detailed process modeling, including two- and three-dimensional modeling of thermal effects, groundwater flow in the saturated-zone aquifers, and gas flow in the unsaturated zone. Probabilistic analyses are performed for aqueous and gaseous flow and transport, human intrusion, and basaltic magmatic activity. Results of the calculations lead to a number of recommendations concerning studies related to site characterization. Primary among these are the recommendations to obtain better information on percolation flux at Yucca Mountain, on the presence or absence of flowing fractures, and on physical and chemical processes influencing gaseous flow. Near-field thermal and chemical processes, and waste-container degradation are also areas where additional investigations may reduce important uncertainties. Recommendations for repository and waste-package design studies are: (1) to evaluate the performance implications of large-size containers, and (2) to investigate in more detail the implications of high repository thermal power output on the adjacent host rock and on the spent fuel

  2. Operational safety performance indicator system - a management tool for the self assessment of safety and reliability of nuclear power plants

    International Nuclear Information System (INIS)

    Anil Kumar; Mandowara, S.L.; Mittal, S.

    2006-01-01

    Operational Safety Performance Indicator system is one of the self assessment tools for station management to monitor safety and reliability of nuclear power plants. It provides information to station management about the performance of various areas of the plants by means of different colours of relevant performance indicators. Such systems have been implemented at many nuclear power plants in the world and have been considered as strength during WANO Peer Review. IAEA had a Coordinated Research Programme (CRP) on this with several countries participating including India. In NPCIL this system has been implemented in KAPS about a year back and found very useful in identifying areas which needs to be given more attention. Based on the KAPS feedback Implementation of this system has been taken up in RAPS-3 and 4 and KGS-l and 2. (author)

  3. Performance assessment calculational exercises

    International Nuclear Information System (INIS)

    Barnard, R.W.; Dockery, H.A.

    1990-01-01

    The Performance Assessment Calculational Exercises (PACE) are an ongoing effort coordinated by Yucca Mountain Project Office. The objectives of fiscal year 1990 work, termed PACE-90, as outlined in the Department of Energy Performance Assessment (PA) Implementation Plan were to develop PA capabilities among Yucca Mountain Project (YMP) participants by calculating performance of a Yucca Mountain (YM) repository under ''expected'' and also ''disturbed'' conditions, to identify critical elements and processes necessary to assess the performance of YM, and to perform sensitivity studies on key parameters. It was expected that the PACE problems would aid in development of conceptual models and eventual evaluation of site data. The PACE-90 participants calculated transport of a selected set of radionuclides through a portion of Yucca Mountain for a period of 100,000 years. Results include analyses of fluid-flow profiles, development of a source term for radionuclide release, and simulations of contaminant transport in the fluid-flow field. Later work included development of a problem definition for perturbations to the originally modeled conditions and for some parametric sensitivity studies. 3 refs

  4. MODERN APPROACHES REGARDING THE ASSESSMENT OF THE COMPANY’S OVERALL PERFORMANCES

    Directory of Open Access Journals (Sweden)

    Pintea Mirela-Oana

    2010-07-01

    Full Text Available The importance of this research can be supported by ambitious goals that are attributed to performance measurement / assessment of a company such as: improving company performance, optimization of company’s management and motivating staff. In the current context of sustainable development, the performance definition, measurement and maximizing system of companies becomes a complex one. The modern business environment demands a multi-goal orientation. Profit theory is no longer a valid measure of organizational performance and neither are other approaches that only take the interests of shareholders (owners of a company into account. Today’s business environment is characterized by the increasing importance and strength of various stakeholder groups. This paper captures the current mutations brought on the line of developing a modern system of assessment of company’s performance.

  5. Application of large underground seasonal thermal energy storage in district heating system : a model-based energy performance assessment of a pilot system in Chifeng, China

    NARCIS (Netherlands)

    Xu, L.; Torrens Galdiz, J.I.; Guo, F.; Yang, X.; Hensen, J.L.M.

    Seasonal thermal energy storage (STES) technology is a proven solution to resolve the seasonal discrepancy between heating energy generation from renewables and building heating demands. This research focuses on the performance assessment of district heating (DH) systems powered by low-grade energy

  6. Assessing ventilation system performance in isolation rooms

    Energy Technology Data Exchange (ETDEWEB)

    Balocco, Carla [Department of Energy Engineering ' ' Sergio Stecco' ' , via S. Marta 3, Firenze (Italy); Lio, Pietro [Computer Laboratory, University of Cambridge, 15 JJ Thompson Avenue, CB03FD Cambridge (United Kingdom)

    2011-01-15

    In this paper numerical transient simulations were used to investigate the air flow patterns, distribution and velocity, and the particulate dispersion inside an existing typical hospitalization room equipped with an advanced Heating Ventilation Air Conditioning (HVAC), with Variable Air Volume (VAV) primary air system designed for immune-suppressed patients never modelled before. The three-dimensional models of the room consider different, most typical, positions of the patients. Results indicate the best conditions for the high induction air inlet diffuser and the scheme of pressures imposed in the room to provide the effective means of controlling flows containing virus droplets. We believe that our work exemplifies the usefulness of numerical investigations of HVAC performances in real situations and provides important recommendations towards disease control and careful design and optimization of ventilation in hospital settings. (author)

  7. Assessing the performance of national innovation systems in Europe

    Energy Technology Data Exchange (ETDEWEB)

    Edquist, C.; Zabala-Iturriagagoitia, J.M.

    2016-07-01

    To support the establishment of the European Innovation Union, the European Commission is using the Innovation Union Scoreboard (IUS). In this paper, the performance of EU28 national innovation systems are analyzed from an efficiency perspective by using exactly the same data as those provided by the IUS for years 2010-2015. This efficiency analysis was carried out using Data Envelopment Analysis. Our analysis demonstrates that the results based on efficiency measures reflect that in general terms innovation systems are widely underexploited in Europe and that there are important variances among territories. We have shown that many countries which devote fewer resources than the innovation leaders, achieve outstanding levels of efficiency and, contrary to what the IUS predicts, countries with consolidated innovation systems, do not show efficiency levels commensurate with their expected competitiveness. (Author)

  8. Application of performance assessment as a tool for guiding project work

    International Nuclear Information System (INIS)

    McCombie, C.; Zuidema, P.

    1992-01-01

    The ultimate aim of the performance assessment methodology developed over the last 10-15 years is to predict quantitatively the behavior of disposal systems over periods of time into the far future. The methodology can, however, also be applied in range of tasks during repository development and is in many programmes used as a tool for improving or optimizing the design of subsystem components of for guiding the course of project planning. In Swiss waste management program, there are several examples of the use of performance assessment as a tool in the manner mentioned above. The interaction between research models, assessment models and simplified models is considered to be of key importance and corresponding measures are taken to properly structure the process and to track the data: first, the results of all applications of the models are included in a consistent manner in the scenario analyses for the different sites and systems and, second, consistency in the underlying assumptions and in the data used in the different model calculations is assured by the consequent application of a configuration data management system (CDM). Almost all the applications of performance assessment have been included in Swiss work, but for this paper, only two examples have been selected: applications of performance assessment in both the HLW and the LLW program; and acceptance of specific waste types and their allocation to an appropriate repository on the basis of simplified safety analyses

  9. Thermodynamic performance assessment of a novel environmentally-benign solar energy based integrated system

    International Nuclear Information System (INIS)

    Yuksel, Yunus Emre; Ozturk, Murat; Dincer, Ibrahim

    2016-01-01

    Highlights: • Development of a novel solar energy based system for multigenaration applications. • Evaluation of the exergy efficiency and destruction rate in each system component. • Investigation of the varying operating conditions on the system performance. • Evaluation of complete parametric studies and performance analysis of the system. - Abstract: In this paper, a novel solar energy based multigeneration system for producing electricity, hydrogen, hot water, heating and cooling is presented and analyzed thermodynamically for potential applications. The energy and exergy analyses are conducted for entire system and its sub-systems, which are a parabolic trough collector system, a double-stage organic Rankine cycle, a proton exchange membrane electrolyzer, a PEM fuel cycle and a quadruple effect absorption cooling system. The parametric studies are performed in order to indicate the impacts of some key indicators on the integrated system performance. These analyses are simulated by using the Engineering Equation Solver software. The results show that the increase in ambient temperature increases the exergetic coefficient performance of the Quadruple Effect Absorption Cooling System. In addition, the increase in solar intensity, temperature of absorber pipes inner surface and concentration of ammonia in working fluid mixture has the positive effect on produced electricity from the expanders and turbine, and hydrogen from the PEM electrolyzer. According to exergy analyses, the largest exergy destruction rates are obtained in the parabolic trough collector, PEM fuel cell and turbine. Therefore, any improvements in these components would lead to a better efficiency of the integrated system.

  10. Post-closure performance assessment treatment of the biosphere

    Energy Technology Data Exchange (ETDEWEB)

    Broderick, M A [UK Nirex Ltd., Harwell, Oxfordshire (United Kingdom); Egan, M J [AEA Technology, Risley, Cheshire (United Kingdom); Thorne, M C [Electrowatt, Horsham, Sussex (United Kingdom); Williams, J A [AEA Technology, Risley, Cheshire (United Kingdom)

    1996-07-01

    The Nirex strategy for radioactive waste disposal is based on a system of engineered and natural barriers, providing long-term isolation of the waste from those parts of the environment that are in contact with or readily available for use by humans (i.e. the biosphere). Even so, there remains the possibility that, on a timescale of thousands to tens of thousands of years, small quantities of poorly-sorbed, long-lived radionuclides may be released from the engineered disposal system, ultimately to emerge into the biosphere. Biosphere models are used in post-closure performance assessments to quantify the competing effects of dilution and accumulation processes on radionuclide concentrations in the accessible environment. Understanding biosphere processes and their time dependence is necessary not only to determine the radiological impact of possible future releases, but also to characterise the dynamics of transport in groundwater and the location, duration and extent of any such releases. Nirex is developing a new biosphere model for use in post-closure radiological assessments for the proposed Sellafield repository. A compartment modelling approach has been adopted, as in studies performed previously, but the system will be dynamic, allowing changes with time in both the properties of compartments and the transfers between compartments. The transport model considers both mass transport within the biosphere and the migration of radionuclides, thereby ensuring that a self-consistent description of the biosphere, in a spatially-extensive domain is maintained. The above approach is designed to link the assessment models used by the Nirex assessment team more closely into the Nirex biosphere research programme than has hitherto been possible with time-invariant assessment models. (author)

  11. Post-closure performance assessment treatment of the biosphere

    International Nuclear Information System (INIS)

    Broderick, M.A.; Egan, M.J.; Thorne, M.C.; Williams, J.A.

    1996-01-01

    The Nirex strategy for radioactive waste disposal is based on a system of engineered and natural barriers, providing long-term isolation of the waste from those parts of the environment that are in contact with or readily available for use by humans (i.e. the biosphere). Even so, there remains the possibility that, on a timescale of thousands to tens of thousands of years, small quantities of poorly-sorbed, long-lived radionuclides may be released from the engineered disposal system, ultimately to emerge into the biosphere. Biosphere models are used in post-closure performance assessments to quantify the competing effects of dilution and accumulation processes on radionuclide concentrations in the accessible environment. Understanding biosphere processes and their time dependence is necessary not only to determine the radiological impact of possible future releases, but also to characterise the dynamics of transport in groundwater and the location, duration and extent of any such releases. Nirex is developing a new biosphere model for use in post-closure radiological assessments for the proposed Sellafield repository. A compartment modelling approach has been adopted, as in studies performed previously, but the system will be dynamic, allowing changes with time in both the properties of compartments and the transfers between compartments. The transport model considers both mass transport within the biosphere and the migration of radionuclides, thereby ensuring that a self-consistent description of the biosphere, in a spatially-extensive domain is maintained. The above approach is designed to link the assessment models used by the Nirex assessment team more closely into the Nirex biosphere research programme than has hitherto been possible with time-invariant assessment models. (author)

  12. A framework for performance and data quality assessment of Radio Frequency IDentification (RFID) systems in health care settings.

    Science.gov (United States)

    van der Togt, Remko; Bakker, Piet J M; Jaspers, Monique W M

    2011-04-01

    RFID offers great opportunities to health care. Nevertheless, prior experiences also show that RFID systems have not been designed and tested in response to the particular needs of health care settings and might introduce new risks. The aim of this study is to present a framework that can be used to assess the performance of RFID systems particularly in health care settings. We developed a framework describing a systematic approach that can be used for assessing the feasibility of using an RFID technology in a particular healthcare setting; more specific for testing the impact of environmental factors on the quality of RFID generated data and vice versa. This framework is based on our own experiences with an RFID pilot implementation in an academic hospital in The Netherlands and a literature review concerning RFID test methods and current insights of RFID implementations in healthcare. The implementation of an RFID system within the blood transfusion chain inside a hospital setting was used as a show case to explain the different phases of the framework. The framework consists of nine phases, including an implementation development plan, RFID and medical equipment interference tests, data accuracy- and data completeness tests to be run in laboratory, simulated field and real field settings. The potential risks that RFID technologies may bring to the healthcare setting should be thoroughly evaluated before they are introduced into a vital environment. The RFID performance assessment framework that we present can act as a reference model to start an RFID development, engineering, implementation and testing plan and more specific, to assess the potential risks of interference and to test the quality of the RFID generated data potentially influenced by physical objects in specific health care environments. Copyright © 2010 Elsevier Inc. All rights reserved.

  13. Dynamic performance assessment of a residential building-integrated cogeneration system under different boundary conditions. Part II: Environmental and economic analyses

    International Nuclear Information System (INIS)

    Rosato, Antonio; Sibilio, Sergio; Scorpio, Michelangelo

    2014-01-01

    Highlights: • A building-integrated micro-cogeneration system was dynamically simulated. • Simulation data were analyzed from both environmental and economic point of views. • The proposed system was compared with a conventional supply system. • The proposed system reduces the environmental impact under heat-led operation. • The proposed system reduces the operating costs whatever the control logic is. - Abstract: This work examines the performance of a residential building-integrated micro-cogeneration system during the winter by means of a whole building simulation software. The cogeneration unit was coupled with a multi-family house composed of three floors, compliant with the transmittance values of both walls and windows suggested by the Italian Law; a stratified combined tank for both heating purposes and domestic hot water production was also used for storing heat. Simulations were performed considering the transient nature of the building and occupant driven loads as well as the part-load characteristics of the cogeneration unit. This system was described in detail and analyzed from an energy point of view in the companion paper. In this paper the simulation results were evaluated in terms of both carbon dioxide equivalent emissions and operating costs; detailed analyses were performed in order to estimate the influence of the most significant boundary conditions on both environmental and economic performance of the proposed system: in particular, three volumes of the hot water storage, four climatic zones corresponding to four Italian cities, two electric demand profiles, as well as two control strategies micro-cogeneration unit were considered. The assessment of environmental impact was performed by using the standard emission factors approach, neglecting the effects of local pollutants. The operating costs due to both natural gas and electric energy consumption were evaluated in detail, whereas both the capital and maintenance costs were

  14. DOE site performance assessment activities

    International Nuclear Information System (INIS)

    1990-07-01

    Information on performance assessment capabilities and activities was collected from eight DOE sites. All eight sites either currently dispose of low-level radioactive waste (LLW) or plan to dispose of LLW in the near future. A survey questionnaire was developed and sent to key individuals involved in DOE Order 5820.2A performance assessment activities at each site. The sites surveyed included: Hanford Site (Hanford), Idaho National Engineering Laboratory (INEL), Los Alamos National Laboratory (LANL), Nevada Test Site (NTS), Oak Ridge National Laboratory (ORNL), Paducah Gaseous Diffusion Plant (Paducah), Portsmouth Gaseous Diffusion Plant (Portsmouth), and Savannah River Site (SRS). The questionnaire addressed all aspects of the performance assessment process; from waste source term to dose conversion factors. This report presents the information developed from the site questionnaire and provides a comparison of site-specific performance assessment approaches, data needs, and ongoing and planned activities. All sites are engaged in completing the radioactive waste disposal facility performance assessment required by DOE Order 5820.2A. Each site has achieved various degrees of progress and have identified a set of critical needs. Within several areas, however, the sites identified common needs and questions

  15. Quality assurance in performance assessments

    Energy Technology Data Exchange (ETDEWEB)

    Maul, P.R.; Watkins, B.M.; Salter, P.; Mcleod, R [QuantiSci Ltd, Henley-on-Thames (United Kingdom)

    1999-01-01

    Following publication of the Site-94 report, SKI wishes to review how Quality Assurance (QA) issues could be treated in future work both in undertaking their own Performance Assessment (PA) calculations and in scrutinising documents supplied by SKB (on planning a repository for spent fuels in Sweden). The aim of this report is to identify the key QA issues and to outline the nature and content of a QA plan which would be suitable for SKI, bearing in mind the requirements and recommendations of relevant standards. Emphasis is on issues which are specific to Performance Assessments for deep repositories for radioactive wastes, but consideration is also given to issues which need to be addressed in all large projects. Given the long time over which the performance of a deep repository system must be evaluated, the demonstration that a repository is likely to perform satisfactorily relies on the use of computer-generated model predictions of system performance. This raises particular QA issues which are generally not encountered in other technical areas (for instance, power station operations). The traceability of the arguments used is a key QA issue, as are conceptual model uncertainty, and code verification and validation; these were all included in the consideration of overall uncertainties in the Site-94 project. Additionally, issues which are particularly relevant to SKI include: How QA in a PA fits in with the general QA procedures of the organisation undertaking the work. The relationship between QA as applied by the regulator and the implementor of a repository development programme. Section 2 introduces the discussion of these issues by reviewing the standards and guidance which are available from national and international organisations. This is followed in Section 3 by a review of specific issues which arise from the Site-94 exercise. An outline procedure for managing QA issues in SKI is put forward as a basis for discussion in Section 4. It is hoped that

  16. Quality assurance in performance assessments

    International Nuclear Information System (INIS)

    Maul, P.R.; Watkins, B.M.; Salter, P.; Mcleod, R

    1999-01-01

    Following publication of the Site-94 report, SKI wishes to review how Quality Assurance (QA) issues could be treated in future work both in undertaking their own Performance Assessment (PA) calculations and in scrutinising documents supplied by SKB (on planning a repository for spent fuels in Sweden). The aim of this report is to identify the key QA issues and to outline the nature and content of a QA plan which would be suitable for SKI, bearing in mind the requirements and recommendations of relevant standards. Emphasis is on issues which are specific to Performance Assessments for deep repositories for radioactive wastes, but consideration is also given to issues which need to be addressed in all large projects. Given the long time over which the performance of a deep repository system must be evaluated, the demonstration that a repository is likely to perform satisfactorily relies on the use of computer-generated model predictions of system performance. This raises particular QA issues which are generally not encountered in other technical areas (for instance, power station operations). The traceability of the arguments used is a key QA issue, as are conceptual model uncertainty, and code verification and validation; these were all included in the consideration of overall uncertainties in the Site-94 project. Additionally, issues which are particularly relevant to SKI include: How QA in a PA fits in with the general QA procedures of the organisation undertaking the work. The relationship between QA as applied by the regulator and the implementor of a repository development programme. Section 2 introduces the discussion of these issues by reviewing the standards and guidance which are available from national and international organisations. This is followed in Section 3 by a review of specific issues which arise from the Site-94 exercise. An outline procedure for managing QA issues in SKI is put forward as a basis for discussion in Section 4. It is hoped that

  17. Texas' performance assessment work

    International Nuclear Information System (INIS)

    Charbeneau, R.J.; Hertel, N.E.; Pollard, C.G.

    1990-01-01

    The Texas Low-Level Radioactive Waste Disposal Authority is completing two years of detailed on-site suitability studies of a potential low-level radioactive waste disposal site in Hudspeth County, Texas. The data from these studies have been used to estimate site specific parameters needed to do a performance assessment of the site. The radiological impacts of the site have been analyzed as required for a license application. The approach adopted for the performance assessment was to use simplified and yet conservative assumptions with regard to releases, radionuclide transport, and dose calculations. The methodologies employed in the performance assessment are reviewed in the paper. Rather than rely on a single computer code, a modular approach to the performance assessment was selected. The HELP code was used to calculate the infiltration rate through the trench covers and the amount of leachate released from this arid site. Individual pathway analyses used spreadsheet calculations. These calculations were compared with those from other computer models including CRRIS, INGDOS, PATHRAE, and MICROSHIELD copyright, and found to yield conservative estimates of the effective whole body dose. The greatest difficulty in performing the radiological assessment of the site was the selection of reasonable source terms for release into the environment. A surface water pathway is unreasonable for the site. Though also unlikely, the groundwater pathway with exposure through a site boundary well was found to yield the largest calculated dose. The more likely pathway including transport of leachate from the facility through the unsaturated zone and returning to the ground surface yields small doses. All calculated doses associated with normal releases of radioactivity are below the regulatory limits

  18. Reciprocal Accountability for Transformative Change: New Hampshire's Performance Assessment of Competency Education

    Science.gov (United States)

    Marion, Scott F.; Vander Els, Jonathan; Leather, Paul

    2017-01-01

    In New Hampshire, a new performance assessment system focuses on reciprocal accountability and shared leadership among teachers and leaders at the school, district, and state levels. This concept of reciprocal accountability, developed by school improvement expert Richard Elmore, is at the core of New Hampshire's Performance Assessment of…

  19. White paper updating conclusions of 1998 ILAW performance assessment

    International Nuclear Information System (INIS)

    MANN, F.M.

    2000-01-01

    The purpose of this document is to provide a comparison of the estimated immobilized low-activity waste (LAW) disposal system performance against established performance objectives using the beat estimates for parameters and models to describe the system. The principal advances in knowledge since the last performance assessment (known as the 1998 ILAW PA [Mann 1998a]) have been in site specific information and data on the waste form performance for BNFL, Inc. relevant glass formulations. The white paper also estimates the maximum release rates for technetium and other key radionuclides and chemicals from the waste form. Finally, this white paper provides limited information on the impact of changes in waste form loading

  20. White paper updating conclusions of 1998 ILAW performance assessment

    Energy Technology Data Exchange (ETDEWEB)

    MANN, F.M.

    2000-05-11

    The purpose of this document is to provide a comparison of the estimated immobilized low-activity waste (LAW) disposal system performance against established performance objectives using the beat estimates for parameters and models to describe the system. The principal advances in knowledge since the last performance assessment (known as the 1998 ILAW PA [Mann 1998a]) have been in site specific information and data on the waste form performance for BNFL, Inc. relevant glass formulations. The white paper also estimates the maximum release rates for technetium and other key radionuclides and chemicals from the waste form. Finally, this white paper provides limited information on the impact of changes in waste form loading.

  1. Assessment of pharmacy information system performance in selected hospitals in isfahan city during 2011.

    Science.gov (United States)

    Saqaeian Nejad Isfahani, Sakineh; Mirzaeian, Razieh; Habibi, Mahbobe

    2013-01-01

    In supporting a therapeutic approach and medication therapy management, pharmacy information system acts as one of the central pillars of information system. This ensures that medication therapy is being supported and evaluated with an optimal level of safety and quality similar to other treatments and services. This research aims to evaluate the performance of pharmacy information system in three types of teaching, private and social affiliated hospitals. The present study is an applied, descriptive and analytical study which was conducted on the pharmacy information system in use in the selected hospitals. The research population included all the users of pharmacy information systems in the selected hospitals. The research sample is the same as the research population. Researchers collected data using a self-designed checklist developed following the guidelines of the American Society of Health-System Pharmacists, Australia pharmaceutical Society and Therapeutic guidelines of the Drug Commission of the German Medical Association. The checklist validity was assessed by research supervisors and pharmacy information system pharmacists and users. To collect data besides observation, the questionnaires were distributed among pharmacy information system pharmacists and users. Finally, the analysis of the data was performed using the SPSS software. Pharmacy information system was found to be semi-automated in 16 hospitals and automated in 3 ones. Regarding the standards in the guidelines issued by the Society of Pharmacists, the highest rank in observing the input standards belonged to the Social Services associated hospitals with a mean score of 32.75. While teaching hospitals gained the highest score both in processing standards with a mean score of 29.15 and output standards with a mean score of 43.95, and the private hospitals had the lowest mean scores of 23.32, 17.78, 24.25 in input, process and output standards respectively. Based on the findings, the studied

  2. Tax Performance Assessment in Scandinavian Countries

    Directory of Open Access Journals (Sweden)

    Bunescu Liliana

    2015-04-01

    Full Text Available The aim of this paper is to evaluate fiscal policy performance level in Nordic countries of Europe by quantifying the gap between their performance and an optimum benchmark value. In this study it was selected Denmark, Finland, Sweden and Norway. These countries occupy the first places in the ranking of countries with the highest rate of tax burden in Europe. The first part of paper contains general aspects of fiscal performance in international research and an overview of the Nordic tax systems model. The second part of paper focuses on evaluation of tax policy performance in these countries by using OptimTax scoring analysis. The research is based on a multivariate analysis instrument that uses quantitative data on various aspects of tax policy. OptimTax achieves a score for assessing the degree of optimization of fiscal policy. The results reveal high levels of tax performance in Scandinavian countries and a trend that seems to be more constant than ascending, except Norway.

  3. Assessing students' performance in software requirements engineering education using scoring rubrics

    Science.gov (United States)

    Mkpojiogu, Emmanuel O. C.; Hussain, Azham

    2017-10-01

    The study investigates how helpful the use of scoring rubrics is, in the performance assessment of software requirements engineering students and whether its use can lead to students' performance improvement in the development of software requirements artifacts and models. Scoring rubrics were used by two instructors to assess the cognitive performance of a student in the design and development of software requirements artifacts. The study results indicate that the use of scoring rubrics is very helpful in objectively assessing the performance of software requirements or software engineering students. Furthermore, the results revealed that the use of scoring rubrics can also produce a good achievement assessments direction showing whether a student is either improving or not in a repeated or iterative assessment. In a nutshell, its use leads to the performance improvement of students. The results provided some insights for further investigation and will be beneficial to researchers, requirements engineers, system designers, developers and project managers.

  4. Health, safety and environmental unit performance assessment model under uncertainty (case study: steel industry).

    Science.gov (United States)

    Shamaii, Azin; Omidvari, Manouchehr; Lotfi, Farhad Hosseinzadeh

    2017-01-01

    Performance assessment is a critical objective of management systems. As a result of the non-deterministic and qualitative nature of performance indicators, assessments are likely to be influenced by evaluators' personal judgments. Furthermore, in developing countries, performance assessments by the Health, Safety and Environment (HSE) department are based solely on the number of accidents. A questionnaire is used to conduct the study in one of the largest steel production companies in Iran. With respect to health, safety, and environment, the results revealed that control of disease, fire hazards, and air pollution are of paramount importance, with coefficients of 0.057, 0.062, and 0.054, respectively. Furthermore, health and environment indicators were found to be the most common causes of poor performance. Finally, it was shown that HSE management systems can affect the majority of performance safety indicators in the short run, whereas health and environment indicators require longer periods of time. The objective of this study is to present an HSE-MS unit performance assessment model in steel industries. Moreover, we seek to answer the following question: what are the factors that affect HSE unit system in the steel industry? Also, for each factor, the extent of impact on the performance of the HSE management system in the organization is determined.

  5. Performance appraisal of multibeam system - Hydrosweep at different seabed provinces

    Digital Repository Service at National Institute of Oceanography (India)

    Kodagali, V.N.; Chakraborty, B.

    The performance of the multibeam sounding system (hydrosweep system) has been assessed at three varying zones of the seabed-continental shelf, continental slope, and deepsea seamount areas. Statistical studies were performed on the beamwise time...

  6. Performance Assessment and Geometric Calibration of RESOURCESAT-2

    Science.gov (United States)

    Radhadevi, P. V.; Solanki, S. S.; Akilan, A.; Jyothi, M. V.; Nagasubramanian, V.

    2016-06-01

    Resourcesat-2 (RS-2) has successfully completed five years of operations in its orbit. This satellite has multi-resolution and multi-spectral capabilities in a single platform. A continuous and autonomous co-registration, geo-location and radiometric calibration of image data from different sensors with widely varying view angles and resolution was one of the challenges of RS-2 data processing. On-orbit geometric performance of RS-2 sensors has been widely assessed and calibrated during the initial phase operations. Since then, as an ongoing activity, various geometric performance data are being generated periodically. This is performed with sites of dense ground control points (GCPs). These parameters are correlated to the direct geo-location accuracy of the RS-2 sensors and are monitored and validated to maintain the performance. This paper brings out the geometric accuracy assessment, calibration and validation done for about 500 datasets of RS-2. The objectives of this study are to ensure the best absolute and relative location accuracy of different cameras, location performance with payload steering and co-registration of multiple bands. This is done using a viewing geometry model, given ephemeris and attitude data, precise camera geometry and datum transformation. In the model, the forward and reverse transformations between the coordinate systems associated with the focal plane, payload, body, orbit and ground are rigorously and explicitly defined. System level tests using comparisons to ground check points have validated the operational geo-location accuracy performance and the stability of the calibration parameters.

  7. LIFE CYCLE ASSESSMENT IN HEALTHCARE SYSTEM OPTIMIZATION. INTRODUCTION

    Directory of Open Access Journals (Sweden)

    V. Sarancha

    2015-03-01

    Full Text Available Article describes the life cycle assessment method and introduces opportunities for method performance in healthcare system settings. LSA draws attention to careful use of resources, environmental, human and social responsibility. Modelling of environmental and technological inputs allows optimizing performance of the system. Various factors and parameters that may influence effectiveness of different sectors in healthcare system are detected. Performance optimization of detected parameters could lead to better system functioning, higher patient safety, economic sustainability and reduce resources consumption.

  8. Performance objectives for the Hanford immobilized low-activity waste (ILAW) performance assessment

    International Nuclear Information System (INIS)

    MANN, F.M.

    1999-01-01

    Before low-level waste may be disposed of, a performance assessment must be written and then approved by the DOE (DOE 1988a, DOE 1999a). The performance assessment is to determine whether ''reasonable assurance'' exists that the performance objectives of the disposal facility will be met. The DOE requirements for waste disposal (DOE 1988a, DOE 1999a) require (see Appendix B): The protection of public health and safety; and The protection of the environment. Although quantitative limits are sometimes stated (for example, the all-pathways exposure limit is 25 mredyear), usually the requirements are stated in a general nature. Quantitative limits were established by: investigating all potentially applicable regulations as well as interpretations of the review panels which DOE has established to review performance assessments; interacting with program management to establish the additional requirements of the program; and interacting with the public (i.e., the Hanford Advisory Board members; as well as affected Tribal Governments) to understand the values of residents in the Pacific Northwest. Because of space considerations, not all radionuclides and dangerous chemicals are listed in this document. The radionuclides listed here are those which were explicitly treated in the ILAW PA (Mann 1998). The dangerous chemicals listed here are those most often detected in Hanford tank waste as documented in the Regulatory Data Quality Objectives Supporting Tank Waste Remediation System Privatization Project (Wiemers 1998)

  9. DEVELOPMENT OF PERFORMANCE ASSESSMENT INSTRUMENT FOR NURSES BASED ON WEB IN INPATIENT UNIT

    Directory of Open Access Journals (Sweden)

    Aprilia Nuryanti

    2017-06-01

    Full Text Available Introduction: Performance assessment instrument will be problematic when it is not representative in describing the competency because it is not obvious indicators and inappropriate performance standard to nursing’s task. The purpose of this study is to develop nurses’ performance assessment instrument based on the web from multi sources assessment inpatient unit at SMC Hospital. Methods: This study had two phases. The first phase was an explanatory overview of the performance assessment system using questionnaires completed by 53 respondents of nurses, selected by purposive sampling. Instrument development based on FGD with six decision makers in the hospital. Validity was tested by Pearson Product Moment Correlation and reliability of instrument’s was tested by alpha Cronbach. The second phase was socialization and instrument test to observe the quality of instrument using a questionnaire by 47 respondents and recommendations made by 8 participants of FGD. The samples were selected by purposive sampling technique. Performance assessment system was moderate at 58.49%. All questions which aimed to measure the performance of nurses were valid and reliable. The quality of nurses’ performance assessment instruments based on the web was a good category, which was functionality: 81.60; reliability: 78.16; efficiency: 80.85; usability: 81.70 and portability: 81.70. Results: The result was a web-based assessment format, scoring with Likert scale, resource assessment by the direct supervisor which was a multisource evaluator, the development of performance graph, and confidentiality of data on the database server. Discussion: Recommendations for hospital is to make policy based on the final value of the performance assessment by the supervisor which was multisource feedback and it needs a global writing on a form of performance assessment result.

  10. Exploration of the Trade Space Between Unmanned Aircraft Systems Descent Maneuver Performance and Sense-and-Avoid System Performance Requirements

    Science.gov (United States)

    Jack, Devin P.; Hoffler, Keith D.; Johnson, Sally C.

    2014-01-01

    A need exists to safely integrate Unmanned Aircraft Systems (UAS) into the United States' National Airspace System. Replacing manned aircraft's see-and-avoid capability in the absence of an onboard pilot is one of the key challenges associated with safe integration. Sense-and-avoid (SAA) systems will have to achieve yet-to-be-determined required separation distances for a wide range of encounters. They will also need to account for the maneuver performance of the UAS they are paired with. The work described in this paper is aimed at developing an understanding of the trade space between UAS maneuver performance and SAA system performance requirements, focusing on a descent avoidance maneuver. An assessment of current manned and unmanned aircraft performance was used to establish potential UAS performance test matrix bounds. Then, near-term UAS integration work was used to narrow down the scope. A simulator was developed with sufficient fidelity to assess SAA system performance requirements. The simulator generates closest-point-of-approach (CPA) data from the wide range of UAS performance models maneuvering against a single intruder with various encounter geometries. Initial attempts to model the results made it clear that developing maneuver performance groups is required. Discussion of the performance groups developed and how to know in which group an aircraft belongs for a given flight condition and encounter is included. The groups are airplane, flight condition, and encounter specific, rather than airplane-only specific. Results and methodology for developing UAS maneuver performance requirements are presented for a descent avoidance maneuver. Results for the descent maneuver indicate that a minimum specific excess power magnitude can assure a minimum CPA for a given time-to-go prediction. However, smaller amounts of specific excess power may achieve or exceed the same CPA if the UAS has sufficient speed to trade for altitude. The results of this study will

  11. Reflections on performance assessment in the Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    Fecht, K.R.; Sonnichsen, J.C.; Woods, T.W.

    1988-01-01

    The national program to develop a high-level waste management system is passing through a period of transition---legislative, political, organizational, and contractual. With the changes that have already occurred and those still under consideration, it is time to examine what ha been done well, in what areas there are now unfulfilled needs in the program, and what improvements might be helpful in the future. The approach and methods with which to assess the performance of the high-level waste management system deserve and enjoy the utmost respect throughout the technical community. Probabilistic risk assessment (PRA) techniques have been conceived, developed and implemented that enable comparative evaluation of various subsystem alternatives, especially geologic media for the repository. This paper argues that the program has need of additional measures of performance important in decision-making processes and suggests additional analytical tools to help assess that performance

  12. The Performance Assessment of the Detector for the Portable Environmental Radiation Distribution Monitoring System with Rapid Nuclide Recognition

    International Nuclear Information System (INIS)

    Lee, Uk Jae; Kim, Hee Reyoung

    2015-01-01

    The environment radiation distribution monitoring system measures the radiation using a portable detector and display the overall radiation distribution. Bluetooth and RS-232 communications are used for constructing monitoring system. However RS-232 serial communication is known to be more stable than Bluetooth and also it can use the detector's raw data which will be used for getting the activity of each artificial nuclide. In the present study, the detection and communication performance of the developed detector with RS-232 method is assessed by using standard sources for the real application to the urban or rural environment. Assessment of the detector for the portable environmental radiation distribution monitoring system with rapid nuclide recognition was carried out. It was understood that the raw data of detector could be effectively treated by using RS-232 method and the measurement showed a good agreement with the calculation within the relative error of 0.4 % in maximum

  13. The Performance Assessment of the Detector for the Portable Environmental Radiation Distribution Monitoring System with Rapid Nuclide Recognition

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Uk Jae; Kim, Hee Reyoung [Ulsan National Institute of Science and Technology, Ulsan (Korea, Republic of)

    2015-05-15

    The environment radiation distribution monitoring system measures the radiation using a portable detector and display the overall radiation distribution. Bluetooth and RS-232 communications are used for constructing monitoring system. However RS-232 serial communication is known to be more stable than Bluetooth and also it can use the detector's raw data which will be used for getting the activity of each artificial nuclide. In the present study, the detection and communication performance of the developed detector with RS-232 method is assessed by using standard sources for the real application to the urban or rural environment. Assessment of the detector for the portable environmental radiation distribution monitoring system with rapid nuclide recognition was carried out. It was understood that the raw data of detector could be effectively treated by using RS-232 method and the measurement showed a good agreement with the calculation within the relative error of 0.4 % in maximum.

  14. Designing Second Language Performance Assessments. Technical Report.

    Science.gov (United States)

    Norris, John M.; Brown, James Dean; Hudson, Thom; Yoshioka, Jim

    This technical report focuses on the decision-making potential provided by second language performance assessments. First, performance assessment is situated within the broader discussion of alternatives in language assessment and in educational assessment in general. Next, issues in performance assessment design, implementation, reliability, and…

  15. Performance of two different digital evaluation systems used for assessing pre-clinical dental students' prosthodontic technical skills.

    Science.gov (United States)

    Gratton, D G; Kwon, S R; Blanchette, D R; Aquilino, S A

    2017-11-01

    Proper integration of newly emerging digital assessment tools is a central issue in dental education in an effort to provide more accurate and objective feedback to students. The study examined how the outcomes of students' tooth preparation were correlated when evaluated using traditional faculty assessment and two types of digital assessment approaches. Specifically, incorporation of the Romexis Compare 2.0 (Compare) and Sirona prepCheck 1.1 (prepCheck) systems was evaluated. Additionally, satisfaction of students based on the type of software was evaluated through a survey. Students in a second-year pre-clinical prosthodontics course were allocated to either Compare (n = 42) or prepCheck (n = 37) systems. All students received conventional instruction and used their assigned digital system as an additional evaluation tool to aid in assessing their work. Examinations assessed crown preparations of the maxillary right central incisor (#8) and the mandibular left first molar (#19). All submissions were graded by faculty, Compare and prepCheck. Technical scores did not differ between student groups for any of the assessment approaches. Compare and prepCheck had modest, statistically significant correlations with faculty scores with a minimum correlation of 0.3944 (P = 0.0011) and strong, statistically significant correlations with each other with a minimum correlation of 0.8203 (P < 0.0001). A post-course student survey found that 55.26% of the students felt unfavourably about learning the digital evaluation protocols. A total of 62.31% felt favourably about the integration of these digital tools into the curriculum. Comparison of Compare and prepCheck showed no evidence of significant difference in students' prosthodontics technical performance and perception. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  16. Integrated Monitoring System for Durability Assessment of Concrete Bridges

    Directory of Open Access Journals (Sweden)

    Cristian-Claudiu Comisu

    2005-01-01

    Full Text Available An ageing and deteriorating bridge stock presents the bridge owners with the growing challenge of maintaining the structures at a satisfactory level of safety, performance and aesthetic appearance within the allocated budgets. This task calls for optimized bridge management based on efficient methods of selecting technical and economical optimal maintenance and rehabilitation strategies. One of the crucial points in the assessment of the current condition and future development and performance. Selecting the optimal maintenance and rehabilitation strategy within the actual budget is a key point in bridge management for which an accurate assessment of performance and deterioration rate is necessary. For this assessment, the use of integrated monitoring system has several advantages compared to the traditional approach of scattered visual inspections combined with occasional on site testing with portable equipment and laboratory testing of collected samples. For this reason, attention is more focusing on the development of permanent integrated monitoring system for durability assessment of concrete bridges. It is estimated that with the implementation of such integrated monitoring systems, it should be possible to reduce the operating costs of inspections and maintenance by 25% and the operator of the structures will be able to take protective actions before damaging processes start. This paper indentifies the main bridge owner requirements to integrated monitoring systems and outlines how monitoring systems may be used for performance and deterioration rate assessment to establish a better basis for selecting the optimal maintenance and rehabilitation strategy.

  17. An environmental assessment system for environmental technologies

    DEFF Research Database (Denmark)

    Clavreul, Julie; Baumeister, Hubert; Christensen, Thomas Højlund

    2014-01-01

    A new model for the environmental assessment of environmental technologies, EASETECH, has been developed. The primary aim of EASETECH is to perform life-cycle assessment (LCA) of complex systems handling heterogeneous material flows. The objectives of this paper are to describe the EASETECH...

  18. Assessment of the Metrological Performance of Seismic Tables for a QMS Recognition

    International Nuclear Information System (INIS)

    Ribeiro, A Silva; Costa, A Campos; Candeias, P; Martins, L Lages; Martins, A C Freitas; Ferreira, A C; Sousa, J Alves e

    2016-01-01

    Seismic testing and analysis using large infrastructures, such as shaking tables and reaction walls, is performed worldwide requiring the use of complex instrumentation systems. To assure the accuracy of these systems, conformity assessment is needed to verify the compliance with standards and applications, and the Quality Management Systems (QMS) is being increasingly applied to domains where risk analysis is critical as a way to provide a formal recognition. This paper describes an approach to the assessment of the metrological performance of seismic shake tables as part of a QMS recognition, with the analysis of a case study of LNEC Seismic shake table. (paper)

  19. Assessment of the Metrological Performance of Seismic Tables for a QMS Recognition

    Science.gov (United States)

    Silva Ribeiro, A.; Campos Costa, A.; Candeias, P.; Sousa, J. Alves e.; Lages Martins, L.; Freitas Martins, A. C.; Ferreira, A. C.

    2016-11-01

    Seismic testing and analysis using large infrastructures, such as shaking tables and reaction walls, is performed worldwide requiring the use of complex instrumentation systems. To assure the accuracy of these systems, conformity assessment is needed to verify the compliance with standards and applications, and the Quality Management Systems (QMS) is being increasingly applied to domains where risk analysis is critical as a way to provide a formal recognition. This paper describes an approach to the assessment of the metrological performance of seismic shake tables as part of a QMS recognition, with the analysis of a case study of LNEC Seismic shake table.

  20. Double-shell tank waste system assessment status and schedule

    International Nuclear Information System (INIS)

    Walter, E.J.

    1995-01-01

    The integrated program for completing the integrity assessments of the dangerous waste tank systems managed by the Tank Waste Remediation System (TWRS) Division of Westinghouse Hanford Company is presented in the Tank Waste Remediation System Tank System Integrity Assessments Program Plan, WHC-SD-AP017, Rev. 1. The program plan identified the assessment requirements and the general scope to which these requirements applied. Some of these assessment requirements have been met and others are either in process of completion or scheduled to be worked. To define the boundary of the double-shell tank (DST) system and the boundaries of the DST system components (or system parts) for the purpose of performing integrity assessment activities; To identify the planned activities to meet the assessment requirements for each component; Provide the status of the assessment activities; and Project a five year assessment activity schedule

  1. Assessing the performance of dynamical trajectory estimates

    Science.gov (United States)

    Bröcker, Jochen

    2014-06-01

    Estimating trajectories and parameters of dynamical systems from observations is a problem frequently encountered in various branches of science; geophysicists for example refer to this problem as data assimilation. Unlike as in estimation problems with exchangeable observations, in data assimilation the observations cannot easily be divided into separate sets for estimation and validation; this creates serious problems, since simply using the same observations for estimation and validation might result in overly optimistic performance assessments. To circumvent this problem, a result is presented which allows us to estimate this optimism, thus allowing for a more realistic performance assessment in data assimilation. The presented approach becomes particularly simple for data assimilation methods employing a linear error feedback (such as synchronization schemes, nudging, incremental 3DVAR and 4DVar, and various Kalman filter approaches). Numerical examples considering a high gain observer confirm the theory.

  2. Safety assessment, safety performance indicators at the Paks Nuclear Power Plant

    International Nuclear Information System (INIS)

    Baji, C.; Vamos, G.; Toth, J.

    2001-01-01

    The Paks Nuclear Power Plant has been using different methods of safety assessment (event analysis, self-assessment, probabilistic safety analysis), including performance indicators characterizing both operational and safety performance since the early years of operation of the plant. Regarding the safety performance, the indicators include safety system performance, number of scrams, release of radioactive materials, number of safety significant events, industrial safety indicator, etc. The Paks NPP also reports a set of ten indicators to WANO Performance Indicator Programme which, among others, include safety related indicators as well. However, a more systematic approach to structuring and trending safety indicators is needed so that they can contribute to the enhancement of the operational safety. A more comprehensive set of indicators and a systematic evaluation process was introduced in 1996. The performance indicators framework proposed by the IAEA was adapted to Paks in this year to further improve the process. Safety culture assessment and characterizing safety culture is part of the assessment process. (author)

  3. Performance Measurement and Accommodation: Students with Visual Impairments on Pennsylvania's Alternate Assessment

    Science.gov (United States)

    Zebehazy, Kim T.; Zigmond, Naomi; Zimmerman, George J.

    2012-01-01

    Introduction: This study investigated the use of accommodations and the performance of students with visual impairments and severe cognitive disabilities on the Pennsylvania Alternate System of Assessment (PASA)yCoan alternate performance-based assessment. Methods: Differences in test scores on the most basic level (level A) of the PASA of 286…

  4. Analysis and performance assessment of a new solar-based multigeneration system integrated with ammonia fuel cell and solid oxide fuel cell-gas turbine combined cycle

    Science.gov (United States)

    Siddiqui, Osamah; Dincer, Ibrahim

    2017-12-01

    In the present study, a new solar-based multigeneration system integrated with an ammonia fuel cell and solid oxide fuel cell-gas turbine combined cycle to produce electricity, hydrogen, cooling and hot water is developed for analysis and performance assessment. In this regard, thermodynamic analyses and modeling through both energy and exergy approaches are employed to assess and evaluate the overall system performance. Various parametric studies are conducted to study the effects of varying system parameters and operating conditions on the energy and exergy efficiencies. The results of this study show that the overall multigeneration system energy efficiency is obtained as 39.1% while the overall system exergy efficiency is calculated as 38.7%, respectively. The performance of this multigeneration system results in an increase of 19.3% in energy efficiency as compared to single generation system. Furthermore, the exergy efficiency of the multigeneration system is 17.8% higher than the single generation system. Moreover, both energy and exergy efficiencies of the solid oxide fuel cell-gas turbine combined cycle are determined as 68.5% and 55.9% respectively.

  5. Alberta's oil sands fiscal system : historical context and system performance

    International Nuclear Information System (INIS)

    2007-01-01

    This report described the fiscal system applied to Alberta's oil sands. It is the first technical report forming part of a series designed to provide information and to invite comment as part of the Government of Alberta's public review of the fiscal system applied to the province's oil and gas resources. Specifically, this report assessed the robustness of Alberta's oil sands fiscal system and assessed how the regime balanced the risks and rewards to both investors and Albertans across a range of expected and probable economic outcomes. The report provided an explanation of the history and context of Alberta's royalty regime and included a case-by-case approach. It also provided a discussion of the oil sands fiscal system description. Next, it described the methodology employed for the analysis of the oil sands fiscal system. It also provided the assumptions for 5 scenario cases and presented the fiscal map approach for assessing project economics and fiscal system performance. Last, summary observations were presented. It was found that the oil sands fiscal system is very flexible for adverse economic conditions and much less so for highly profitable conditions. tabs., figs

  6. Performance diagnostic system for emergency diesel generators

    International Nuclear Information System (INIS)

    Logan, K.P.

    1991-01-01

    Diesel generators are commonly used for emergency backup power at nuclear stations. Emergency diesel generators (EDGs) are subject to both start-up and operating failures, due to infrequent and fast-start use. EDG reliability can be critical to plant safety, particularly when station blackout occurs. This paper describes an expert diagnostic system designed to consistently evaluate the operating performance of diesel generators. The prototype system is comprised of a suite of sensor monitoring, cylinder combustion analyzing, and diagnostic workstation computers. On-demand assessments of generator and auxiliary equipment performance are provided along with color trend displays comparing measured performance to reference-normal conditions

  7. Performance assessment of sealing systems. Conceptual and integrated modelling of plugs and seals

    Energy Technology Data Exchange (ETDEWEB)

    Ruebel, Andre; Buhmann, Dieter; Kindlein, Jonathan; Lauke, Thomas

    2016-08-15

    The long-time isolation of radionuclides from the biosphere is the goal of the storage of radioactive waste in deep geological repositories. For repositories in rock salt, this goal is achieved on the one hand by the impermeable undisturbed part of the salt host rock formation and on the other hand by crushed salt, which is used to backfill the mine openings in the emplacement areas and galleries created during the construction of the repository. The crushed salt backfill is compacted over time and achieves a sufficiently high hydraulic resistance to avoid inflow of brines into the emplacement areas of the repository in the long-term. Plugs and seals must additionally provide their sealing function during the early post closure phase, until the compaction of the backfill is adequate and the permeability of the backfill is sufficiently low. To assess the future development of the waste repository, an adequate knowledge of the material behaviour is necessary and related mathematical models must be developed to be able to perform predictions on the long-term safety of the repository. An integrated performance assessment model was formulated that describes the long-term behaviour of a sealing built from salt concrete. The average permeability of the sealing changes with time after its emplacement from various processes of which two were regarded in a constitutive model: first, the healing of the EDZ in the host rock around the sealing, and second, the corrosion of the salt concrete material resulting from brine attack. Empirical parameter model functions were defined for both processes to reflect the actual behaviour. The mathematical model was implemented in the integrated performance assessment model LOPOS which is used by GRS as near-field model for repositories in salt. Deterministic and probabilistic calculations were performed with realistic parameters showing how the permeability of the sealing decreases during the first 2 000 years due to the healing of the EDZ

  8. Performance assessment of sealing systems. Conceptual and integrated modelling of plugs and seals

    International Nuclear Information System (INIS)

    Ruebel, Andre; Buhmann, Dieter; Kindlein, Jonathan; Lauke, Thomas

    2016-08-01

    The long-time isolation of radionuclides from the biosphere is the goal of the storage of radioactive waste in deep geological repositories. For repositories in rock salt, this goal is achieved on the one hand by the impermeable undisturbed part of the salt host rock formation and on the other hand by crushed salt, which is used to backfill the mine openings in the emplacement areas and galleries created during the construction of the repository. The crushed salt backfill is compacted over time and achieves a sufficiently high hydraulic resistance to avoid inflow of brines into the emplacement areas of the repository in the long-term. Plugs and seals must additionally provide their sealing function during the early post closure phase, until the compaction of the backfill is adequate and the permeability of the backfill is sufficiently low. To assess the future development of the waste repository, an adequate knowledge of the material behaviour is necessary and related mathematical models must be developed to be able to perform predictions on the long-term safety of the repository. An integrated performance assessment model was formulated that describes the long-term behaviour of a sealing built from salt concrete. The average permeability of the sealing changes with time after its emplacement from various processes of which two were regarded in a constitutive model: first, the healing of the EDZ in the host rock around the sealing, and second, the corrosion of the salt concrete material resulting from brine attack. Empirical parameter model functions were defined for both processes to reflect the actual behaviour. The mathematical model was implemented in the integrated performance assessment model LOPOS which is used by GRS as near-field model for repositories in salt. Deterministic and probabilistic calculations were performed with realistic parameters showing how the permeability of the sealing decreases during the first 2 000 years due to the healing of the EDZ

  9. Context for performance assessment

    International Nuclear Information System (INIS)

    Kocher, D.C.

    1997-01-01

    In developing its recommendations on performance assessment for disposal of low-level radioactive waste, Scientific committee 87-3 of the National Council on Radiation Protection and Measurements (NCRP) has considered a number of topics that provide a context for the development of suitable approaches to performance assessment. This paper summarizes the Committee' discussions on these topics, including (1) the definition of low-level waste and its sources and properties, as they affect the variety of wastes that must be considered, (2) fundamental objectives and principles of radioactive waste disposal and their application to low-level waste, (3) current performance objectives for low-level waste disposal in the US, with particular emphasis on such unresolved issues of importance to performance assessment as the time frame for compliance, requirements for protection of groundwater and surface water, inclusion of doses from radon, demonstrating compliance with fixed performance objectives using highly uncertain model projections, and application of the principle that releases to the environment should be maintained as low as reasonably achievable (ALARA), (4) the role of active and passive institutional controls over disposal sites, (5) the role of the inadvertent human intruder in low-level waste disposal, (6) model validation and confidence in model outcomes, and (7) the concept of reasonable assurance of compliance

  10. Framework for feasibility assessment and performance analysis of riverbank filtration systems for water treatment

    KAUST Repository

    Sharma, Saroj K.

    2012-03-01

    Bank filtration (BF) is an attractive, robust and reliable water treatment technology. It has been used in Europe and USA for a long time; however experience with this technology so far is site specific. There are no guidelines or tools for transfer of this technology to other locations, specifically to developing countries. A four-step methodology was developed at UNESCO-IHE to analyse feasibility and to predict the performance of BF for water treatment. This included (i) hydraulic simulation using MODFLOW; (ii) determination of share of bank filtrate using NASRI BF simulator; (iii) prediction of water quality from a BF system using the water quality guidelines developed and (iv) comparison of the costs of BF systems and existing conventional surface water treatment systems for water treatment. The methodology was then applied to assess feasibility of BF in five cities in Africa. It was found that in most of the cities studied BF is a feasible and attractive option from hydraulic, water quality as well as operational cost considerations. Considerable operational and maintenance costs saving can be achieved and water quality can be further improved by switching from conventional chemical-based surface water treatment to BF or at least by replacing some of the treatment units with BF systems. © IWA Publishing 2012.

  11. Guidance on the Technology Performance Level (TPL) Assessment Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Weber, Jochem [National Renewable Energy Lab. (NREL), Golden, CO (United States); Roberts, Jesse D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Babarit, Aurelien [Ecole Centrale de Nantes (France). Lab. of Research in Hydrodynamics, Energetics and Atmospheric Environment (LHEEA); Costello, Ronan [Wave Venture, Penstraze (United Kingdom); Bull, Diana L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Neilson, Kim [Ramboll, Copenhagen (Denmark); Bittencourt, Claudio [DNV GL, London (United Kingdom); Kennedy, Ben [Wave Venture, Penstraze (United Kingdom); Malins, Robert Joseph [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Dykes, Katherine [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    This document presents the revised Technology Performance Level (TPL) assessment methodology. There are three parts to this revised methodology 1) the Stakeholder Needs and Assessment Guidance (this document), 2) the Technical Submission form, 3) the TPL scoring spreadsheet. The TPL assessment is designed to give a technology neutral or agnostic assessment of any wave energy converter technology. The focus of the TPL is on the performance of the technology in meeting the customer’s needs. The original TPL is described in [1, 2] and those references also detail the critical differences in the nature of the TPL when compared to the more widely used technology readiness level (TRL). (Wave energy TRL is described in [3]). The revised TPL is particularly intended to be useful to investors and also to assist technology developers to conduct comprehensive assessments in a way that is meaningful and attractive to investors. The revised TPL assessment methodology has been derived through a structured Systems Engineering approach. This was a formal process which involved analyzing customer and stakeholder needs through the discipline of Systems Engineering. The results of the process confirmed the high level of completeness of the original methodology presented in [1] (as used in the Wave Energy Prize judging) and now add a significantly increased level of detail in the assessment and an improved more investment focused structure. The revised TPL also incorporates the feedback of the Wave Energy Prize judges.

  12. The Performance of an Object-Oriented, Parallel Operating System

    Directory of Open Access Journals (Sweden)

    David R. Kohr, Jr.

    1994-01-01

    Full Text Available The nascent and rapidly evolving state of parallel systems often leaves parallel application developers at the mercy of inefficient, inflexible operating system software. Given the relatively primitive state of parallel systems software, maximizing the performance of parallel applications not only requires judicious tuning of the application software, but occasionally, the replacement of specific system software modules with others that can more readily respond to the imposed pattern of resource demands. To assess the feasibility of application and performance tuning via malleable system software and to understand the performance penalties for detailed operating system performance data capture, we describe a set of performance instrumentation techniques for parallel, object-oriented operating systems and a set of performance experiments with Choices, an experimental, object-oriented operating system designed for use with parallel sys- tems. These performance experiments show that (a the performance overhead for operating system data capture is modest, (b the penalty for malleable, object-oriented operating systems is negligible, but (c techniques are needed to strictly enforce adherence of implementation to design if operating system modules are to be replaced.

  13. Preliminary performance assessment for the Waste Isolation Pilot Plant, December 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This volume documents model parameters chosen as of July 1992 that were used by the Performance Assessment Department of Sandia National Laboratories in its 1992 preliminary performance assessment of the Waste Isolation Pilot Plant (WIPP). Ranges and distributions for about 300 modeling parameters in the current secondary data base are presented in tables for the geologic and engineered barriers, global materials (e.g., fluid properties), and agents that act upon the WIPP disposal system such as climate variability and human-intrusion boreholes. The 49 parameters sampled in the 1992 Preliminary Performance Assessment are given special emphasis with tables and graphics that provide insight and sources of data for each parameter

  14. Cost and performance analysis of physical security systems

    International Nuclear Information System (INIS)

    Hicks, M.J.; Yates, D.; Jago, W.H.

    1997-01-01

    CPA - Cost and Performance Analysis - is a prototype integration of existing PC-based cost and performance analysis tools: ACEIT (Automated Cost Estimating Integrated Tools) and ASSESS (Analytic System and Software for Evaluating Safeguards and Security). ACE is an existing DOD PC-based tool that supports cost analysis over the full life cycle of a system; that is, the cost to procure, operate, maintain and retire the system and all of its components. ASSESS is an existing DOE PC-based tool for analysis of performance of physical protection systems. Through CPA, the cost and performance data are collected into Excel workbooks, making the data readily available to analysts and decision makers in both tabular and graphical formats and at both the system and subsystem levels. The structure of the cost spreadsheets incorporates an activity-based approach to cost estimation. Activity-based costing (ABC) is an accounting philosophy used by industry to trace direct and indirect costs to the products or services of a business unit. By tracing costs through security sensors and procedures and then mapping the contributions of the various sensors and procedures to system effectiveness, the CPA architecture can provide security managers with information critical for both operational and strategic decisions. The architecture, features and applications of the CPA prototype are presented. 5 refs., 3 figs

  15. An updated fracture-flow model for total-system performance assessment of Yucca Mountain

    International Nuclear Information System (INIS)

    Gauthier, J.H.

    1994-01-01

    Improvements have been made to the fracture-flow model being used in the total-system performance assessment of a potential high-level radioactive waste repository at Yucca Mountain, Nevada. The open-quotes weeps modelclose quotes now includes (1) weeps of varied sizes, (2) flow-pattern fluctuations caused by climate change, and (3) flow-pattern perturbations caused by repository heat generation. Comparison with the original weeps model indicates that allowing weeps of varied sizes substantially reduces the number of weeps and the number of containers contacted by weeps. However, flow-pattern perturbations caused by either climate change or repository heat generation greatly increases the number of containers contacted by weeps. In preliminary total-system calculations, using a phenomenological container-failure and radionuclide-release model, the weeps model predicts that radionuclide releases from a high-level radioactive waste repository at Yucca Mountain will be below the EPA standard specified in 40 CFR 191, but that the maximum radiation dose to an individual could be significant. Specific data from the site are required to determine the validity of the weep-flow mechanism and to better determine the parameters to which the dose calculation is sensitive

  16. An updated fracture-flow model for total-system performance assessment of Yucca Mountain

    International Nuclear Information System (INIS)

    Gauthier, J.H.

    1994-01-01

    Improvements have been made to the fracture-flow model being used in the total-system performance assessment of a potential high-level radioactive waste repository at Yucca Mountain, Nevada. The ''weeps model'' now includes (1) weeps of varied sizes, (2) flow-pattern fluctuations caused by climate change, and (3) flow-pattern perturbations caused by repository heat generation. Comparison with the original weeps model indicates that allowing weeps of varied sizes substantially reduces the number of weeps and the number of containers contacted by weeps. However, flow-pattern perturbations caused by either climate change or repository heat generation greatly increases the number of containers contacted by weeps. In preliminary total-system calculations, using a phenomenological container-failure and radionuclide-release model, the weeps model predicts that radionuclide releases from a high-level radioactive waste repository at Yucca Mountain will be below the EPA standard specified in 40 CFR 191, but that the maximum radiation dose to an individual could be significant. Specific data from the site are required to determine the validity of the weep-flow mechanism and to better determine the parameters to which the dose calculation is sensitive

  17. Performance assessment in algebra learning process

    Science.gov (United States)

    Lestariani, Ida; Sujadi, Imam; Pramudya, Ikrar

    2017-12-01

    The purpose of research to describe the implementation of performance assessment on algebra learning process. The subject in this research is math educator of SMAN 1 Ngawi class X. This research includes descriptive qualitative research type. Techniques of data collecting are done by observation method, interview, and documentation. Data analysis technique is done by data reduction, data presentation, and conclusion. The results showed any indication that the steps taken by the educator in applying the performance assessment are 1) preparing individual worksheets and group worksheets, 2) preparing rubric assessments for independent worksheets and groups and 3) making performance assessments rubric to learners’ performance results with individual or groups task.

  18. On the choice of performance assessment criteria and their impact on the overall system performance

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Green, Torben

    2010-01-01

    capacity gap issue in the supermarket refrigeration systems is used as a case study to elaborate on the problem through employment of both real life field data as well as simulation data. A performance function that can capture the compressor capacity gap problem is presented in the paper and used...... to evaluate both data from the real supermarket system and the data generated by the simulation model....

  19. 40 CFR 194.33 - Consideration of drilling events in performance assessments.

    Science.gov (United States)

    2010-07-01

    ... assessments. (a) Performance assessments shall examine deep drilling and shallow drilling that may potentially affect the disposal system during the regulatory time frame. (b) The following assumptions and process... process shall be documented in any compliance application: (1) Inadvertent and intermittent intrusion by...

  20. Consideration of environmental change in performance assessments

    International Nuclear Information System (INIS)

    Pinedo, P.; Thorne, M.; Egan, M.; Calvez, M.; Kautsky, U.

    2005-01-01

    Depending on the particular circumstances in which a post-closure performance assessment of a radioactive waste repository is made, it may be appropriate to follow simple or more complex approaches in characterising the biosphere. Several different Example Reference Biospheres were explored in BIOMASS Theme 1 to address a range of issues that arise. Here, consideration is given to Example Reference Biospheres relevant to representing the implications of changes that may occur within the biosphere system during the period over which releases of radionuclides from a disposal facility might take place. Mechanisms of change considered include those extrinsic and intrinsic to the system of interest. An overall methodology for incorporating environmental change into assessments is proposed. This includes screening of primary mechanisms of change; identification of possible time sequences of change; development of a coherent description of the regional landscape response for each time sequence; integration of source term and geosphere-biosphere interface information; identification and description of one or more time series of assessment biospheres; and evaluation of the advantages and disadvantages of simulating the effects of sequences of biosphere systems and the transitions between them, or of defining a set of biosphere systems to be represented individually in a non-sequential analysis. The usefulness of the methodology is explored in two site-specific examples and one generic example

  1. Assessment of resident operative performance using a real-time mobile Web system: preparing for the milestone age.

    Science.gov (United States)

    Wagner, Justin P; Chen, David C; Donahue, Timothy R; Quach, Chi; Hines, O Joe; Hiatt, Jonathan R; Tillou, Areti

    2014-01-01

    To satisfy trainees' operative competency requirements while improving feedback validity and timeliness using a mobile Web-based platform. The Southern Illinois University Operative Performance Rating Scale (OPRS) was embedded into a website formatted for mobile devices. From March 2013 to February 2014, faculty members were instructed to complete the OPRS form while providing verbal feedback to the operating resident at the conclusion of each procedure. Submitted data were compiled automatically within a secure Web-based spreadsheet. Conventional end-of-rotation performance (CERP) evaluations filed 2006 to 2013 and OPRS performance scores were compared by year of training using serial and independent-samples t tests. The mean CERP scores and OPRS overall resident operative performance scores were directly compared using a linear regression model. OPRS mobile site analytics were reviewed using a Web-based reporting program. Large university-based general surgery residency program. General Surgery faculty used the mobile Web OPRS system to rate resident performance. Residents and the program director reviewed evaluations semiannually. Over the study period, 18 faculty members and 37 residents logged 176 operations using the mobile OPRS system. There were 334 total OPRS website visits. Median time to complete an evaluation was 45 minutes from the end of the operation, and faculty spent an average of 134 seconds on the site to enter 1 assessment. In the 38,506 CERP evaluations reviewed, mean performance scores showed a positive linear trend of 2% change per year of training (p = 0.001). OPRS overall resident operative performance scores showed a significant linear (p = 0.001), quadratic (p = 0.001), and cubic (p = 0.003) trend of change per year of clinical training, reflecting the resident operative experience in our training program. Differences between postgraduate year-1 and postgraduate year-5 overall performance scores were greater with the OPRS (mean = 0.96, CI

  2. Review of SR 97 performance assessment

    International Nuclear Information System (INIS)

    Glynn, P.D.

    2000-01-01

    This review has identified many technical problems in the SR 97 performance assessment. The general impression of this reviewer is that SKB has been disingenuous in its performance assessment effort. It has not cited important differences of opinion with its own views. Furthermore, there are many inconsistencies in the SR 97 report that all together leave the impression that there are many more uncertainties in the SR 97 performance assessment than SKB would perhaps care to admit. Additionally, despite SKB's statements to the contrary, many of the analyses conducted for the SR 97 performance assessment can be clearly shown not to have been based on 'conservative' assumptions. Finally, SKB has made little effort to consider possible coupling effects between their different scenarios in SR 97. This is a serious flaw in the SR 97 performance assessment. The comments in this review should not be taken to imply that the KBS-3 nuclear waste disposal method will not be able to meet the safety and radiation protection requirements which SKI and SSI have specified in recent years. Instead, my conclusion is simply that the SR 97 performance assessment of the KBS-3 method would have been more believable had it been based on a forthright and comprehensive discussion of facts, uncertainties and opinions, and on a more conservative choice of assumptions. As it stands, the SR 97 performance assessment is not very credible

  3. Developing Web-oriented Homework System to Assess Students’ Introductory Physics Course Performance and Compare to Paper-based Peer Homework

    Directory of Open Access Journals (Sweden)

    Neset DEMIRCI

    2006-07-01

    Full Text Available The World Wide Web influences education and our lives in many ways. Nowadays, Web-based homework has been becoming widespread practice in physics courses and some other courses as well. Although are some disputes whether this is an encouraging or risky development for student learning, there is limited research assessing the pedagogical effect of changing the medium from written, hand-graded homework to online oriented, computer-graded homework. In this study, web-oriented homework system is developed to assess students’ introductory physics course performance. Later on, these results are compared with paper-based (peer homework performance for mid enrollment physics courses. One of two identical sections of introductory physics course students received paper-based, hand graded group homework while the other received the individual web-based homework. Then two groups’ on conceptual and problem-solving performance measures are compared. No significant differences were found in students’ Force Concept Inventory (FCI test scores; however, average homework performance scores were significant that could be attributed to the homework method used in favor of paper-based peer homework group.

  4. PERFORMANCE ASSESSMENT AND GEOMETRIC CALIBRATION OF RESOURCESAT-2

    Directory of Open Access Journals (Sweden)

    P. V. Radhadevi

    2016-06-01

    Full Text Available Resourcesat-2 (RS-2 has successfully completed five years of operations in its orbit. This satellite has multi-resolution and multi-spectral capabilities in a single platform. A continuous and autonomous co-registration, geo-location and radiometric calibration of image data from different sensors with widely varying view angles and resolution was one of the challenges of RS-2 data processing. On-orbit geometric performance of RS-2 sensors has been widely assessed and calibrated during the initial phase operations. Since then, as an ongoing activity, various geometric performance data are being generated periodically. This is performed with sites of dense ground control points (GCPs. These parameters are correlated to the direct geo-location accuracy of the RS-2 sensors and are monitored and validated to maintain the performance. This paper brings out the geometric accuracy assessment, calibration and validation done for about 500 datasets of RS-2. The objectives of this study are to ensure the best absolute and relative location accuracy of different cameras, location performance with payload steering and co-registration of multiple bands. This is done using a viewing geometry model, given ephemeris and attitude data, precise camera geometry and datum transformation. In the model, the forward and reverse transformations between the coordinate systems associated with the focal plane, payload, body, orbit and ground are rigorously and explicitly defined. System level tests using comparisons to ground check points have validated the operational geo-location accuracy performance and the stability of the calibration parameters.

  5. L-Band Digital Aeronautical Communications System Engineering - Concepts of Use, Systems Performance, Requirements, and Architectures

    Science.gov (United States)

    Zelkin, Natalie; Henriksen, Stephen

    2010-01-01

    This NASA Contractor Report summarizes and documents the work performed to develop concepts of use (ConUse) and high-level system requirements and architecture for the proposed L-band (960 to 1164 MHz) terrestrial en route communications system. This work was completed as a follow-on to the technology assessment conducted by NASA Glenn Research Center and ITT for the Future Communications Study (FCS). ITT assessed air-to-ground (A/G) communications concepts of use and operations presented in relevant NAS-level, international, and NAS-system-level documents to derive the appropriate ConUse relevant to potential A/G communications applications and services for domestic continental airspace. ITT also leveraged prior concepts of use developed during the earlier phases of the FCS. A middle-out functional architecture was adopted by merging the functional system requirements identified in the bottom-up assessment of existing requirements with those derived as a result of the top-down analysis of ConUse and higher level functional requirements. Initial end-to-end system performance requirements were derived to define system capabilities based on the functional requirements and on NAS-SR-1000 and the Operational Performance Assessment conducted as part of the COCR. A high-level notional architecture of the L-DACS supporting A/G communication was derived from the functional architecture and requirements.

  6. Historical Background on the Performance Assessment for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    RECHARD, ROBERT P.

    1999-01-01

    In 1979, six years after selecting the Delaware Basin as a potential disposal area, Congress authorized the U.S. Department of Energy to build the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, as a Research and development facility for the safe management storage, and disposal of waste contaminated with transuranic radioisotopes. In 1998, 19 years after authorization and after site selection, the U.S. Environmental Protection Agency (EPA) certified that the WIPP disposal system complied with its regulations. The EPA's decision was primarily based on the results from a performance. assessment conducted in 1996, which is summarized in this special issue of Reliability Engineering and System Safety. This performance assessment was the culmination of four preliminary performance assessments conducted between 1989 and 1992. This paper provides a historical setting and context for how the performance of the deep geologic repository at the WIPP was analyzed. Also included is background on political forces acting on the project

  7. Uncertainty and sensitivity analysis using probabilistic system assessment code. 1

    International Nuclear Information System (INIS)

    Honma, Toshimitsu; Sasahara, Takashi.

    1993-10-01

    This report presents the results obtained when applying the probabilistic system assessment code under development to the PSACOIN Level 0 intercomparison exercise organized by the Probabilistic System Assessment Code User Group in the Nuclear Energy Agency (NEA) of OECD. This exercise is one of a series designed to compare and verify probabilistic codes in the performance assessment of geological radioactive waste disposal facilities. The computations were performed using the Monte Carlo sampling code PREP and post-processor code USAMO. The submodels in the waste disposal system were described and coded with the specification of the exercise. Besides the results required for the exercise, further additional uncertainty and sensitivity analyses were performed and the details of these are also included. (author)

  8. Quantitative risk assessment system (QRAS)

    Science.gov (United States)

    Weinstock, Robert M (Inventor); Smidts, Carol S (Inventor); Mosleh, Ali (Inventor); Chang, Yung-Hsien (Inventor); Swaminathan, Sankaran (Inventor); Groen, Francisco J (Inventor); Tan, Zhibin (Inventor)

    2001-01-01

    A quantitative risk assessment system (QRAS) builds a risk model of a system for which risk of failure is being assessed, then analyzes the risk of the system corresponding to the risk model. The QRAS performs sensitivity analysis of the risk model by altering fundamental components and quantifications built into the risk model, then re-analyzes the risk of the system using the modifications. More particularly, the risk model is built by building a hierarchy, creating a mission timeline, quantifying failure modes, and building/editing event sequence diagrams. Multiplicities, dependencies, and redundancies of the system are included in the risk model. For analysis runs, a fixed baseline is first constructed and stored. This baseline contains the lowest level scenarios, preserved in event tree structure. The analysis runs, at any level of the hierarchy and below, access this baseline for risk quantitative computation as well as ranking of particular risks. A standalone Tool Box capability exists, allowing the user to store application programs within QRAS.

  9. Economics of human performance and systems total ownership cost.

    Science.gov (United States)

    Onkham, Wilawan; Karwowski, Waldemar; Ahram, Tareq Z

    2012-01-01

    Financial costs of investing in people is associated with training, acquisition, recruiting, and resolving human errors have a significant impact on increased total ownership costs. These costs can also affect the exaggerate budgets and delayed schedules. The study of human performance economical assessment in the system acquisition process enhances the visibility of hidden cost drivers which support program management informed decisions. This paper presents the literature review of human total ownership cost (HTOC) and cost impacts on overall system performance. Economic value assessment models such as cost benefit analysis, risk-cost tradeoff analysis, expected value of utility function analysis (EV), growth readiness matrix, multi-attribute utility technique, and multi-regressions model were introduced to reflect the HTOC and human performance-technology tradeoffs in terms of the dollar value. The human total ownership regression model introduces to address the influencing human performance cost component measurement. Results from this study will increase understanding of relevant cost drivers in the system acquisition process over the long term.

  10. Assessing the Performance of Automatic Speech Recognition Systems When Used by Native and Non-Native Speakers of Three Major Languages in Dictation Workflows

    DEFF Research Database (Denmark)

    Zapata, Julián; Kirkedal, Andreas Søeborg

    2015-01-01

    In this paper, we report on a two-part experiment aiming to assess and compare the performance of two types of automatic speech recognition (ASR) systems on two different computational platforms when used to augment dictation workflows. The experiment was performed with a sample of speakers...

  11. State Standards and State Assessment Systems: A Guide to Alignment. Series on Standards and Assessments.

    Science.gov (United States)

    La Marca, Paul M.; Redfield, Doris; Winter, Phoebe C.

    Alignment of content standards, performance standards, and assessments is crucial. This guide contains information to assist states and districts in aligning their assessment systems to their content and performance standards. It includes a review of current literature, both published and fugitive. The research is woven together with a few basic…

  12. The DECADE performance assessment program

    International Nuclear Information System (INIS)

    Weber, B.V.; Ottinger, P.F.; Commisso, R.J.; Thompson, J.; Rowley, J.E.; Filios, P.; Babineau, M.A.

    1996-01-01

    Previous analyses of DECADE Module 1 experiments indicated significant current loss between the plasma opening switch (POS) and an electron-beam load. A program was initiated to diagnose and improve the power flow to assess the performance of a multi-module DECADE system. Power flow measurements between the POS and load indicate high vacuum flow, distributed current loss and azimuthal asymmetries. A decreased load impedance reduces the fraction of the load current flowing in vacuum. Improved plasma source symmetry reduces losses near the load for long conduction times. Increased POS impedance is required to significantly improve the power coupling to the load. (author). 6 figs., 9 refs

  13. The DECADE performance assessment program

    Energy Technology Data Exchange (ETDEWEB)

    Weber, B V; Ottinger, P F; Commisso, R J [Naval Research Lab., Washington, DC (United States). Plasma Physics Div.; Goyer, J R; Kortbawi, D [Physics International Co., Berkeley, CA (United States); Thompson, J [Maxwell Labs., San Diego, CA (United States); Rowley, J E; Filios, P [Defense Nuclear Agency, Alexandria, VA (United States); Babineau, M A [Sverdlup Technology, Tullahoma, TN (United States)

    1997-12-31

    Previous analyses of DECADE Module 1 experiments indicated significant current loss between the plasma opening switch (POS) and an electron-beam load. A program was initiated to diagnose and improve the power flow to assess the performance of a multi-module DECADE system. Power flow measurements between the POS and load indicate high vacuum flow, distributed current loss and azimuthal asymmetries. A decreased load impedance reduces the fraction of the load current flowing in vacuum. Improved plasma source symmetry reduces losses near the load for long conduction times. Increased POS impedance is required to significantly improve the power coupling to the load. (author). 6 figs., 9 refs.

  14. PISA and High-Performing Education Systems: Explaining Singapore's Education Success

    Science.gov (United States)

    Deng, Zongyi; Gopinathan, S.

    2016-01-01

    Singapore's remarkable performance in Programme for International Student Assessment (PISA) has placed it among the world's high-performing education systems (HPES). In the literature on HPES, its "secret formula" for education success is explained in terms of teacher quality, school leadership, system characteristics and educational…

  15. Standardized assessment of infrared thermographic fever screening system performance

    Science.gov (United States)

    Ghassemi, Pejhman; Pfefer, Joshua; Casamento, Jon; Wang, Quanzeng

    2017-03-01

    Thermal modalities represent the only currently viable mass fever screening approach for outbreaks of infectious disease pandemics such as Ebola and SARS. Non-contact infrared thermometers (NCITs) and infrared thermographs (IRTs) have been previously used for mass fever screening in transportation hubs such as airports to reduce the spread of disease. While NCITs remain a more popular choice for fever screening in the field and at fixed locations, there has been increasing evidence in the literature that IRTs can provide greater accuracy in estimating core body temperature if appropriate measurement practices are applied - including the use of technically suitable thermographs. Therefore, the purpose of this study was to develop a battery of evaluation test methods for standardized, objective and quantitative assessment of thermograph performance characteristics critical to assessing suitability for clinical use. These factors include stability, drift, uniformity, minimum resolvable temperature difference, and accuracy. Two commercial IRT models were characterized. An external temperature reference source with high temperature accuracy was utilized as part of the screening thermograph. Results showed that both IRTs are relatively accurate and stable (<1% error of reading with stability of +/-0.05°C). Overall, results of this study may facilitate development of standardized consensus test methods to enable consistent and accurate use of IRTs for fever screening.

  16. Assessing Ecosystem Model Performance in Semiarid Systems

    Science.gov (United States)

    Thomas, A.; Dietze, M.; Scott, R. L.; Biederman, J. A.

    2017-12-01

    In ecosystem process modelling, comparing outputs to benchmark datasets observed in the field is an important way to validate models, allowing the modelling community to track model performance over time and compare models at specific sites. Multi-model comparison projects as well as models themselves have largely been focused on temperate forests and similar biomes. Semiarid regions, on the other hand, are underrepresented in land surface and ecosystem modelling efforts, and yet will be disproportionately impacted by disturbances such as climate change due to their sensitivity to changes in the water balance. Benchmarking models at semiarid sites is an important step in assessing and improving models' suitability for predicting the impact of disturbance on semiarid ecosystems. In this study, several ecosystem models were compared at a semiarid grassland in southwestern Arizona using PEcAn, or the Predictive Ecosystem Analyzer, an open-source eco-informatics toolbox ideal for creating the repeatable model workflows necessary for benchmarking. Models included SIPNET, DALEC, JULES, ED2, GDAY, LPJ-GUESS, MAESPA, CLM, CABLE, and FATES. Comparison between model output and benchmarks such as net ecosystem exchange (NEE) tended to produce high root mean square error and low correlation coefficients, reflecting poor simulation of seasonality and the tendency for models to create much higher carbon sources than observed. These results indicate that ecosystem models do not currently adequately represent semiarid ecosystem processes.

  17. Performance assessment of geological isolation systems for radioactive waste. Disposal in granite formations

    International Nuclear Information System (INIS)

    Van Kote, F.; Peres, J.M.; Olivier, M.; Lewi, J.; Assouline, M.; Mejon-Goula, M.J.

    1988-01-01

    In the framework of the PAGIS project of the CEC Research Programme on radioactive wastes, a performance assessment of a repository of vitrified HLW in granite was carried out. Three disposal sites were considered: the reference site Auriat and two alternative sites, Barfleur and a site in the U.K. The report describes the methodology adopted (a deterministic and a stochastic approach) with the corresponding data base and the models used. A parametric study of sub-systems (near field, far field and biosphere) was carried out by CEA-ANDRA using AQUARIUS, DIMITRIO and BIOS. A global evaluation of the performances was carried out by CEA-IPSN using MELODIE code. The results of deterministic calculations showed for Auriat a maximum dose equivalent evaluated at 6.10 -3 m Sv/a arising 3 millions years after disposal. Results of human intrusion scenario analyses, uncertainty analyses and global sensitivity analyses are presented. This document is one of a set of 5 reports covering a relevant project of the European Community on a nuclear safety subject having very wide interest. The five volumes are: the summary (EUR 11775-EN), the clay (EUR 11776-EN), the granite (EUR 11777-FR), the salt (EUR 11778-EN) and the sub-seabed (EUR 11779-EN)

  18. The international probabilistic system assessment group. Background and results 1990

    International Nuclear Information System (INIS)

    1991-01-01

    The OECD Nuclear Energy Agency (NEA) devotes considerable effort to the further development of methodologies to assess the performance of radioactive waste disposal systems, and to increase confidence in their application and results. The NEA provides an international forum for the exchange of information and experience among national experts of its twenty-three Member countries and conducts joint studies of issues important for safety assessment. In 1985, the NEA Radioactive Waste Management Committee set up the Probabilistic System Assessment Code User Group (PSAC), in order to help coordinate the development of probabilistic system assessment codes. The activities of the Group include exchange of information, code and experience, discussion of relevant technical issues, and the conduct of code comparison (PSACOIN) exercises designed to build confidence in the correct operation of these tools for safety assessment. The Group is now known simply as the Probabilistic System Assessment Group (PSAG). This report has been prepared to inform interested parties, beyond the group of specialists directly involved, about probabilistic system assessment techniques as used for performance assessment of waste disposal systems, and to give a summary of the objectives and achievements of PSAG. The report is published under the responsibility of the Secretary General of the OECD

  19. Modelling saline intrusion for repository performance assessment

    International Nuclear Information System (INIS)

    Jackson, C.P.

    1989-04-01

    UK Nirex Ltd are currently considering the possibility of disposal of radioactive waste by burial in deep underground repositories. The natural pathway for radionuclides from such a repository to return to Man's immediate environment (the biosphere) is via groundwater. Thus analyses of the groundwater flow in the neighbourhood of a possible repository, and consequent radionuclide transport form an important part of a performance assessment for a repository. Some of the areas in the UK that might be considered as possible locations for a repository are near the coast. If a repository is located in a coastal region seawater may intrude into the groundwater flow system. As seawater is denser than fresh water buoyancy forces acting on the intruding saline water may have significant effects on the groundwater flow system, and consequently on the time for radionuclides to return to the biosphere. Further, the chemistry of the repository near-field may be strongly influenced by the salinity of the groundwater. It is therefore important for Nirex to have a capability for reliably modelling saline intrusion to an appropriate degree of accuracy in order to make performance assessments for a repository in a coastal region. This report describes work undertaken in the Nirex Research programme to provide such a capability. (author)

  20. The Feasibility of Real-Time Intraoperative Performance Assessment With SIMPL (System for Improving and Measuring Procedural Learning): Early Experience From a Multi-institutional Trial.

    Science.gov (United States)

    Bohnen, Jordan D; George, Brian C; Williams, Reed G; Schuller, Mary C; DaRosa, Debra A; Torbeck, Laura; Mullen, John T; Meyerson, Shari L; Auyang, Edward D; Chipman, Jeffrey G; Choi, Jennifer N; Choti, Michael A; Endean, Eric D; Foley, Eugene F; Mandell, Samuel P; Meier, Andreas H; Smink, Douglas S; Terhune, Kyla P; Wise, Paul E; Soper, Nathaniel J; Zwischenberger, Joseph B; Lillemoe, Keith D; Dunnington, Gary L; Fryer, Jonathan P

    Intraoperative performance assessment of residents is of growing interest to trainees, faculty, and accreditors. Current approaches to collect such assessments are limited by low participation rates and long delays between procedure and evaluation. We deployed an innovative, smartphone-based tool, SIMPL (System for Improving and Measuring Procedural Learning), to make real-time intraoperative performance assessment feasible for every case in which surgical trainees participate, and hypothesized that SIMPL could be feasibly integrated into surgical training programs. Between September 1, 2015 and February 29, 2016, 15 U.S. general surgery residency programs were enrolled in an institutional review board-approved trial. SIMPL was made available after 70% of faculty and residents completed a 1-hour training session. Descriptive and univariate statistics analyzed multiple dimensions of feasibility, including training rates, volume of assessments, response rates/times, and dictation rates. The 20 most active residents and attendings were evaluated in greater detail. A total of 90% of eligible users (1267/1412) completed training. Further, 13/15 programs began using SIMPL. Totally, 6024 assessments were completed by 254 categorical general surgery residents (n = 3555 assessments) and 259 attendings (n = 2469 assessments), and 3762 unique operations were assessed. There was significant heterogeneity in participation within and between programs. Mean percentage (range) of users who completed ≥1, 5, and 20 assessments were 62% (21%-96%), 34% (5%-75%), and 10% (0%-32%) across all programs, and 96%, 75%, and 32% in the most active program. Overall, response rate was 70%, dictation rate was 24%, and mean response time was 12 hours. Assessments increased from 357 (September 2015) to 1146 (February 2016). The 20 most active residents each received mean 46 assessments by 10 attendings for 20 different procedures. SIMPL can be feasibly integrated into surgical training programs

  1. ACCOUNTING FOR USERS' INFLATED ASSESSMENTS OF ONLINE CATALOG SEARCH PERFORMANCE AND USEFULNESS: AN EXPERIMENTAL STUDY

    Directory of Open Access Journals (Sweden)

    Charles R. Hildreth

    2001-01-01

    Full Text Available User-oriented approaches to information retrieval (IR system performance evaluation assign a major role to user satisfaction with search results and overall system performance. Expressed satisfaction with search results is often used as a measure of utility. Many research studies indicate that users of on-line library catalogs (OPACs and other IR systems often express satisfaction with poor search results. This phenomenon of "false positives," inflated assessments of search results and system performance, has not been adequately explained. Non-performance factors such as interface style and ease of use may have an affect on a searcher's satisfaction with search results. The research described in this report investigates this phenomenon. This paper presents the findings of an experimental study which compared users' search performance and assessments of ease of use, system usefulness, and satisfaction with search results after use of a Web OPAC or its conventional counterpart. The primary questions addressed by this research center on the influence of two experimental factors, OPAC search interface style and search task level of difficulty, on the dependent variables: actual search performance, perceptions of ease of use and system usefulness, and assessments of satisfaction with search results. The study also investigated associations between perceived ease of use, system usefulness, and satisfaction with search results. Lastly, the study looked for associations between the dependent variables and personal characteristics. No association was found between satisfaction with search results and actual search performance. Web OPAC searchers outperformed Text OPAC searchers, but search task level of difficulty is a major determinant of search success. A strong positive correlation was found between perceptions of system ease of use and assessments of search results.

  2. Confidence building on the total system performance assessment code, MASCOT-K for permanent disposal of HLW in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Y. S.; Kim, S. G.; Kang, C. H

    2002-12-01

    To perform Total System Performance Assessment(TSPA) of a potential HLW repository, it is necessary to develop the TSPA code. KAERI has developed the one-dimensional PSA code MASCOT-K since 1997 and verified special modules dedicated for the dissolution of spent nuclear fuel. In the second R and D phase, MASCOT-K is once again verified as a part of the confidence building for TSPA. The AMBER code based on the totally different mathematical approach, compartment theory is used together with MASCOT-K to assess the annual individual doses for given K- and Q- scenarios. Results indicate that both AMBER and MASCOT-K simulate the annual individual doses to a potential biosphere. And the MASCOT-K is more flexible to describe the natural barrier such as a fracture for sensitivity studies. In the third R and D phase, MASCOT-K will be actively used to check whether the proposed KAERI reference disposal concept is solid or not.

  3. Confidence building on the total system performance assessment code, MASCOT-K for permanent disposal of HLW in Korea

    International Nuclear Information System (INIS)

    Hwang, Y. S.; Kim, S. G.; Kang, C. H.

    2002-12-01

    To perform Total System Performance Assessment(TSPA) of a potential HLW repository, it is necessary to develop the TSPA code. KAERI has developed the one-dimensional PSA code MASCOT-K since 1997 and verified special modules dedicated for the dissolution of spent nuclear fuel. In the second R and D phase, MASCOT-K is once again verified as a part of the confidence building for TSPA. The AMBER code based on the totally different mathematical approach, compartment theory is used together with MASCOT-K to assess the annual individual doses for given K- and Q- scenarios. Results indicate that both AMBER and MASCOT-K simulate the annual individual doses to a potential biosphere. And the MASCOT-K is more flexible to describe the natural barrier such as a fracture for sensitivity studies. In the third R and D phase, MASCOT-K will be actively used to check whether the proposed KAERI reference disposal concept is solid or not

  4. Innovative Tools to Assess Systems Thinking Ability

    Science.gov (United States)

    2017-12-01

    addition to the six cognitive ability constructs, there are two motivational attributes that are highly relevant to systems thinking performance...roles of the habenular complex, the reward system , and the cingulate motor area revealed by functional magnetic resonance imaging. Journal of...Technical Report 1362 Innovative Tools to Assess Systems Thinking Ability Cory Adis Michelle Wisecarver Chelsey Raber Personnel

  5. Performance assessment: a peer review

    International Nuclear Information System (INIS)

    Lieberman, J.A.; Lee, W.W.L.

    1986-01-01

    This paper describes the rationale, membership, operation and major observations of the Performance Assessment National Review Group. The Group was assembled by Weston at the request of the US Department of Energy Office of Civilian Radioactive Waste Management to review performance assessment work in the US basalt, salt and tuff repository projects. The purposes were to evaluate the adequacy of the current methods, identify deficiencies, and suggest potential improvement on repository performance assessment. To perform the review, Weston retained a group of distinguished consultants who have had extensive experience in disciplines pertinent to management of radioactive wastes including mathematical modeling of fluid transport. Topics reviewed included flow and transport, source term and uncertainty analysis. While the emphasis was on methodologies, the Projects were specifically requested to show currently available results so that the way they utilized familiar methodologies could be evaluated. This paper will highlight some of the technical observations of the Group as well as some managerial and institutional issues

  6. PERFORM: a system for monitoring, assessment and management of patients with Parkinson's disease.

    Science.gov (United States)

    Tzallas, Alexandros T; Tsipouras, Markos G; Rigas, Georgios; Tsalikakis, Dimitrios G; Karvounis, Evaggelos C; Chondrogiorgi, Maria; Psomadellis, Fotis; Cancela, Jorge; Pastorino, Matteo; Waldmeyer, María Teresa Arredondo; Konitsiotis, Spiros; Fotiadis, Dimitrios I

    2014-11-11

    In this paper, we describe the PERFORM system for the continuous remote monitoring and management of Parkinson's disease (PD) patients. The PERFORM system is an intelligent closed-loop system that seamlessly integrates a wide range of wearable sensors constantly monitoring several motor signals of the PD patients. Data acquired are pre-processed by advanced knowledge processing methods, integrated by fusion algorithms to allow health professionals to remotely monitor the overall status of the patients, adjust medication schedules and personalize treatment. The information collected by the sensors (accelerometers and gyroscopes) is processed by several classifiers. As a result, it is possible to evaluate and quantify the PD motor symptoms related to end of dose deterioration (tremor, bradykinesia, freezing of gait (FoG)) as well as those related to over-dose concentration (Levodopa-induced dyskinesia (LID)). Based on this information, together with information derived from tests performed with a virtual reality glove and information about the medication and food intake, a patient specific profile can be built. In addition, the patient specific profile with his evaluation during the last week and last month, is compared to understand whether his status is stable, improving or worsening. Based on that, the system analyses whether a medication change is needed--always under medical supervision--and in this case, information about the medication change proposal is sent to the patient. The performance of the system has been evaluated in real life conditions, the accuracy and acceptability of the system by the PD patients and healthcare professionals has been tested, and a comparison with the standard routine clinical evaluation done by the PD patients' physician has been carried out. The PERFORM system is used by the PD patients and in a simple and safe non-invasive way for long-term record of their motor status, thus offering to the clinician a precise, long-term and

  7. Treatment of uncertainty in the US department of energy's yucca mountain repository total system performance assessment (TSPA)

    International Nuclear Information System (INIS)

    Van Luik, A.; Zwahlen, E.

    2004-01-01

    The regulatory requirements being addressed in the US geological repository programme for spent nuclear fuel and high-level waste specify that performance assessment is to be used to address probabilistically defined mean-value dose constraints. Dose was chosen as the preferred performance measure because an acceptable dose limit could be selected through the regulation-setting process, based on a defined acceptable risk. By setting a dose limit, arguments about the conversion of a potential dose to a potential risk was taken off the table as a potential licensing issue. However, the probabilistic approach called for actually delivers a 'risk of a dose', a risk of a potential given dose value to a hypothetical person living at a set distance from the repository, with a set lifestyle, between the time of permanent closure and 10 000 years. Analyses must also be shown for the peak dose if it occurs after 10 000 years, essentially to a million years. For uncertain parameters that are important to system performance, the goal is to present an analysis that, in accord with applicable regulation, focuses on the mean value of the performance measure but also explores the 'full range of defensible and reasonable parameter distributions'.... System performance evaluations should not be unduly influenced by... 'extreme physical situations and parameter values'. These disclosure requirements are to be met by showing a range of potential outcomes and designating the mean value within that range. (author)

  8. Performance Assessment of Mergers and Acquisitions

    DEFF Research Database (Denmark)

    Wang, Daojuan; Moini, Hamid

    2012-01-01

    on the performance measures and benchmarks adopted in M&A research field and the relevant empirical results. We find that the definitions of performance varied in terms of accounting, financial, operational and perceptual metrics. And performance assessment is sensitive to the definition of performance, methodology......Corporate mergers and acquisitions (M&As) have been increasing popular during these decades. However, a majority of research show failure rate (40% - 80%) has not significantly changed. This “success paradox” triggers us to reflect on performance assessment of M&As: how the performance of M...

  9. Guidelines for radiological performance assessment of DOE low-level radioactive waste disposal sites

    International Nuclear Information System (INIS)

    Case, M.J.; Otis, M.D.

    1988-07-01

    This document provides guidance for conducting radiological performance assessments of Department of Energy (DOE) low-level radioactive waste (LLW) disposal facilities. The guidance is specifically intended to provide the fundamental approach necessary to meet the performance assessment requirements. The document is written for LLW facility operators or other personnel who will manage the performance assessment task. The document is meant to provide guidance for conducting performance assessments in a generally consistent manner at all DOE LLW disposal facilities. The guidance includes a summary of performance objectives to be met by LLW disposal facilities (these objectives are derived from current DOE and other applicable federal regulatory guidelines); specific criteria for an adequate performance assessment and from which a minimum set of required calculations may be determined; recommendations of methods for screening critical components of the analysis system so that these components can be addressed in detail; recommendations for the selection of existing models and the development of site-specific models; recommendations of techniques for comparison of assessment results with performance objectives; and a summary of reporting requirements

  10. Safeguards research: assessing material control and accounting systems

    International Nuclear Information System (INIS)

    Maimoni, A.

    1977-01-01

    The Laboratory is working for the Nuclear Regulatory Commission to improve the safeguarding of special nuclear material at nuclear fuel processing facilities, to provide a basis for improved regulations for material control and accounting systems, and to develop an assessment procedure for verifying compliance with these regulations. Early work included setting up a hierarchy of safeguard objectives and a set of measurable parameters with which systems performance to meet those objectives can be measured. Present work has focused on developing a computerized assessment procedure. We have also completed a test bed (based on a plutonium nitrate storage area) to identify and correct problems in the procedure and to show how this procedure can be used to evaluate the performance of an applicant's material control and accounting system

  11. Sources/treatment of uncertainties in the performance assessment of geologic radioactive waste repositories

    International Nuclear Information System (INIS)

    Cranwell, R.M.

    1987-01-01

    Uncertainties in the performance assessment of geologic radioactive waste repositories have several sources. The more important ones include: 1) uncertainty in the conditions of a disposal system over the temporal scales set forth in regulations, 2) uncertainty in the conceptualization of the geohydrologic system, 3) uncertainty in the theoretical description of a given conceptual model of the system, 4) uncertainty in the development of computer codes to implement the solution of a mathematical model, and 5) uncertainty in the parameters and data required in the models and codes used to assess the long-term performance of the disposal system. This paper discusses each of these uncertainties and outlines methods for addressing these uncertainties

  12. System structure and cognitive ability as predictors of performance in dynamic system control tasks

    Directory of Open Access Journals (Sweden)

    Jan Hundertmark

    2015-12-01

    Full Text Available In dynamic system control, cognitive mechanisms and abilities underlying performance may vary depending on the nature of the task. We therefore investigated the effects of system structure and its interaction with cognitive abilities on system control performance. A sample of 127 university students completed a series of different system control tasks that were manipulated in terms of system size and recurrent feedback, either with or without a cognitive load manipulation. Cognitive abilities assessed included reasoning ability, working memory capacity, and cognitive reflection. System size and recurrent feedback affected overall performance as expected. Overall, the results support that cognitive ability is a good predictor of performance in dynamic system control tasks but predictiveness is reduced when the system structure contains recurrent feedback. We discuss this finding from a cognitive processing perspective as well as its implications for individual differences research in dynamic systems.

  13. Low-level radioactive waste performance assessments: Source term modeling

    International Nuclear Information System (INIS)

    Icenhour, A.S.; Godbee, H.W.; Miller, L.F.

    1995-01-01

    Low-level radioactive wastes (LLW) generated by government and commercial operations need to be isolated from the environment for at least 300 to 500 yr. Most existing sites for the storage or disposal of LLW employ the shallow-land burial approach. However, the U.S. Department of Energy currently emphasizes the use of engineered systems (e.g., packaging, concrete and metal barriers, and water collection systems). Future commercial LLW disposal sites may include such systems to mitigate radionuclide transport through the biosphere. Performance assessments must be conducted for LUW disposal facilities. These studies include comprehensive evaluations of radionuclide migration from the waste package, through the vadose zone, and within the water table. Atmospheric transport mechanisms are also studied. Figure I illustrates the performance assessment process. Estimates of the release of radionuclides from the waste packages (i.e., source terms) are used for subsequent hydrogeologic calculations required by a performance assessment. Computer models are typically used to describe the complex interactions of water with LLW and to determine the transport of radionuclides. Several commonly used computer programs for evaluating source terms include GWSCREEN, BLT (Breach-Leach-Transport), DUST (Disposal Unit Source Term), BARRIER (Ref. 5), as well as SOURCE1 and SOURCE2 (which are used in this study). The SOURCE1 and SOURCE2 codes were prepared by Rogers and Associates Engineering Corporation for the Oak Ridge National Laboratory (ORNL). SOURCE1 is designed for tumulus-type facilities, and SOURCE2 is tailored for silo, well-in-silo, and trench-type disposal facilities. This paper focuses on the source term for ORNL disposal facilities, and it describes improved computational methods for determining radionuclide transport from waste packages

  14. Conceptual framework for performance assessment: competency, competence and performance in the context of assessments in healthcare--deciphering the terminology.

    Science.gov (United States)

    Khan, Kamran; Ramachandran, Sankaranarayanan

    2012-01-01

    The definitions of performance, competence and competency are not very clear in the literature. The assessment of performance and the selection of tools for this purpose depend upon a deep understanding of each of the above terms and the factors influencing performance. In this article, we distinguish between competence and competency and explain the relationship of competence and performance in the light of the Dreyfus model of skills acquisition. We briefly critique the application of the principles described by Miller to the modern assessment tools and distinguish between assessment of actual performance in workplace settings and the observed performance, demonstrated by the candidates in the workplace or simulated settings. We describe a modification of the Dreyfus model applicable to assessments in healthcare and propose a new model for the assessment of performance and performance rating scale (PRS) based on this model. We propose that the use of adapted versions of this PRS will result in benchmarking of performance and allowing the candidates to track their progression of skills in various areas of clinical practice.

  15. Competency Assessment Using Key Performance Indicators

    OpenAIRE

    Elena Alexandra Toader; Laura Brad

    2015-01-01

    The paper proposes a method for computing the scores of the key performance indicators resulted in the competency assessment process. The key performance indicators are estimated considering four performance levels that an IT professional can obtain at the end of the assessment process. We suggest as the best approach for estimating the performance key indicators an online questionnaire filled by 60 employees that work in IT Romanian companies. The results provide evidence that the difference...

  16. A Web-Based Peer-Assessment Approach to Improving Junior High School Students' Performance, Self-Efficacy and Motivation in Performing Arts Courses

    Science.gov (United States)

    Hsia, Lu-Ho; Huang, Iwen; Hwang, Gwo-Jen

    2016-01-01

    In this paper, a web-based peer-assessment approach is proposed for conducting performing arts activities. A peer-assessment system was implemented and applied to a junior high school performing arts course to evaluate the effectiveness of the proposed approach. A total of 163 junior high students were assigned to an experimental group and a…

  17. Assessing the Performance of Imaging Health Systems in Five Selected Hospitals in Uganda

    Directory of Open Access Journals (Sweden)

    Michael G Kawooya

    2012-01-01

    Full Text Available Objectives : The first objective of the study was to develop an index termed as the ′Imaging Coverage′ (IC, for measuring the performance of the imaging health systems. This index together with the Hospital-Based Utilization (HBU would then be calculated for five Ugandan hospitals. Second, was to relate the financial resources and existing health policy to the performance of the imaging systems. Materials and Methods: This was a cross-sectional survey employing the triangulation methodology, conducted in Mulago National Referral Hospital. The qualitative study used cluster sampling, in-depth interviews, focus group discussions, and self-administered questionnaires to explore the non-measurable aspects of the imaging systems′ performances. Results: The IC developed and tested as an index for the imaging system′s performance was 36%. General X-rays had the best IC followed by ultrasound. The Hospital-Based Utilization for the five selected hospitals was 186 per thousand and was the highest for general radiography followed by ultrasound. Conclusion: The IC for the five selected hospitals was 36% and the HBU was 186 per thousand, reflecting low performance levels, largely attributable to inadequate funding. There were shortfalls in imaging requisitions and inefficiencies in the imaging systems, financing, and health policy. Although the proportion of inappropriate imaging was small, reducing this inappropriateness even further would lead to a significant total saving, which could be channeled into investigating more patients. Financial resources stood out as the major limitation in attaining the desired performance and there is a need to increase budget funding so as to improve the performance of the imaging health systems.

  18. Assessing Scientific Performance.

    Science.gov (United States)

    Weiner, John M.; And Others

    1984-01-01

    A method for assessing scientific performance based on relationships displayed numerically in published documents is proposed and illustrated using published documents in pediatric oncology for the period 1979-1982. Contributions of a major clinical investigations group, the Childrens Cancer Study Group, are analyzed. Twenty-nine references are…

  19. Implementing Management Systems-Based Assessments

    International Nuclear Information System (INIS)

    Campisi, John A.; Reese, Robert T.

    1999-01-01

    centralized management systems. The resulting corporate management system gives the appearance of an assembly of multiple, nearly independent operating units. The executive management system maintains these separate units, encouraging autonomy and creativity by establishing a minimum of requirements and procedures. In any organization, senior management has a responsibility to ensure that all operating units are meeting requirements. Part of this responsibility is fulfilled by conducting oversight or assurance activities, to determine the effectiveness of established systems in meeting requirements and performance expectations. Internal independent assessment is one of these assurance activities. Independent appraisals are combined with external audits and appraisals, self-assessments, peer reviews, project reviews, and other internal and external audits (e.g., financial, contractual) for a more complete assurance view. At SNL, internal independent appraisals are performed by the Audit Center, which reports directly to the Executive Vice President. ES ampersand H independent appraisals are the responsibility of the ES ampersand H and Quality Assessments Department, with a staff complement of eight. With our organization's charter to perform internal, independent appraisals, we set out to develop an approach and associated tools, which would be useful in the overall SNL environment and within our resource limitations

  20. Implementing Management Systems-Based Assessments

    Energy Technology Data Exchange (ETDEWEB)

    Campisi, John A.; Reese, Robert T.

    1999-05-03

    centralized management systems. The resulting corporate management system gives the appearance of an assembly of multiple, nearly independent operating units. The executive management system maintains these separate units, encouraging autonomy and creativity by establishing a minimum of requirements and procedures. In any organization, senior management has a responsibility to ensure that all operating units are meeting requirements. Part of this responsibility is fulfilled by conducting oversight or assurance activities, to determine the effectiveness of established systems in meeting requirements and performance expectations. Internal independent assessment is one of these assurance activities. Independent appraisals are combined with external audits and appraisals, self-assessments, peer reviews, project reviews, and other internal and external audits (e.g., financial, contractual) for a more complete assurance view. At SNL, internal independent appraisals are performed by the Audit Center, which reports directly to the Executive Vice President. ES&H independent appraisals are the responsibility of the ES&H and Quality Assessments Department, with a staff complement of eight. With our organization's charter to perform internal, independent appraisals, we set out to develop an approach and associated tools, which would be useful in the overall SNL environment and within our resource limitations.

  1. Sorption, Diffusion and Solubility Databases for Performance Assessment

    International Nuclear Information System (INIS)

    Garcia Gutierrez, M.

    2000-01-01

    This report presents a deterministic and probabilistic databases for application in Performance Assessment of a high-level radioactive waste disposal. This work includes a theoretical description of sorption, diffusion and solubility phenomena of radionuclides in geological media. The report presents and compares the databases of different nuclear wastes management agencies, describes the materials in the Spanish reference system, and the results of sorption diffusion and solubility in this system, with both the deterministic and probabilistic approximation. The probabilistic approximation is presented in the form of probability density functions (pdf). (Author) 52 refs

  2. Hard Real-Time Performances in Multiprocessor-Embedded Systems Using ASMP-Linux

    Directory of Open Access Journals (Sweden)

    Daniel Pierre Bovet

    2008-01-01

    Full Text Available Multiprocessor systems, especially those based on multicore or multithreaded processors, and new operating system architectures can satisfy the ever increasing computational requirements of embedded systems. ASMP-LINUX is a modified, high responsiveness, open-source hard real-time operating system for multiprocessor systems capable of providing high real-time performance while maintaining the code simple and not impacting on the performances of the rest of the system. Moreover, ASMP-LINUX does not require code changing or application recompiling/relinking. In order to assess the performances of ASMP-LINUX, benchmarks have been performed on several hardware platforms and configurations.

  3. Hard Real-Time Performances in Multiprocessor-Embedded Systems Using ASMP-Linux

    Directory of Open Access Journals (Sweden)

    Betti Emiliano

    2008-01-01

    Full Text Available Abstract Multiprocessor systems, especially those based on multicore or multithreaded processors, and new operating system architectures can satisfy the ever increasing computational requirements of embedded systems. ASMP-LINUX is a modified, high responsiveness, open-source hard real-time operating system for multiprocessor systems capable of providing high real-time performance while maintaining the code simple and not impacting on the performances of the rest of the system. Moreover, ASMP-LINUX does not require code changing or application recompiling/relinking. In order to assess the performances of ASMP-LINUX, benchmarks have been performed on several hardware platforms and configurations.

  4. Proposed evaluation framework for assessing operator performance with multisensor displays

    Science.gov (United States)

    Foyle, David C.

    1992-01-01

    Despite aggressive work on the development of sensor fusion algorithms and techniques, no formal evaluation procedures have been proposed. Based on existing integration models in the literature, an evaluation framework is developed to assess an operator's ability to use multisensor, or sensor fusion, displays. The proposed evaluation framework for evaluating the operator's ability to use such systems is a normative approach: The operator's performance with the sensor fusion display can be compared to the models' predictions based on the operator's performance when viewing the original sensor displays prior to fusion. This allows for the determination as to when a sensor fusion system leads to: 1) poorer performance than one of the original sensor displays (clearly an undesirable system in which the fused sensor system causes some distortion or interference); 2) better performance than with either single sensor system alone, but at a sub-optimal (compared to the model predictions) level; 3) optimal performance (compared to model predictions); or, 4) super-optimal performance, which may occur if the operator were able to use some highly diagnostic 'emergent features' in the sensor fusion display, which were unavailable in the original sensor displays. An experiment demonstrating the usefulness of the proposed evaluation framework is discussed.

  5. Optimal energy management of urban rail systems: Key performance indicators

    International Nuclear Information System (INIS)

    González-Gil, A.; Palacin, R.; Batty, P.

    2015-01-01

    Highlights: • An overall picture of urban rail energy use is provided. • Performance indicators are developed for urban rail system energy optimisation. • A multi-level methodology for assessing energy efficiency measures is presented. - Abstract: Urban rail systems are facing increasing pressure to minimise their energy consumption and thusly reduce their operational costs and environmental impact. However, given the complexity of such systems, this can only be effectively achieved through a holistic approach which considers the numerous interdependences between subsystems (i.e. vehicles, operations and infrastructure). Such an approach requires a comprehensive set of energy consumption-related Key Performance Indicators (KEPIs) that enable: a multilevel analysis of the actual energy performance of the system; an assessment of potential energy saving strategies; and the monitoring of the results of implemented measures. This paper proposes an original, complete list of KEPIs developed through a scientific approach validated by different stakeholders. It consists of a hierarchical list of 22 indicators divided into two levels: 10 key performance indicators, to ascertain the performance of the whole system and complete subsystems; and 12 performance indicators, to evaluate the performance of single units within subsystems, for example, a single rail vehicle or station. Additionally, the paper gives a brief insight into urban rail energy usage by providing an adequate context in which to understand the proposed KEPIs, together with a methodology describing their application when optimising the energy consumption of urban rail systems

  6. Forecasting the Performance of Agroforestry Systems

    Science.gov (United States)

    Luedeling, E.; Shepherd, K.

    2014-12-01

    spuriously precise model results at face value, and it is able to make predictions even where data is scarce. It thus provides a rapid and honest assessment option that can quickly supply decision-makers with system performance estimates, offering an opportunity to improve the targeting of agroforestry interventions.

  7. Site-generic approach for performance assessment of HLW disposal system in Japan

    International Nuclear Information System (INIS)

    Umeki, H.; Ishiguro, K.; Takase, H.; Yui, M.; Sasaki, N.; Masuda, S.

    1991-01-01

    This paper presents an overview of the preliminary performance analyses and description of R ampersand D activities designed based upon the results of the analyses, which are to be incorporated in the FY1991 progress report. A preliminary performance analysis for the engineered barriers was made considering wide range of geochemical and hydrological characteristics of geological environment in Japan. The results indicate possibility that adequately designed engineered barrier subsystem with chemical buffer capability reduces release rate to the geosphere to sufficiently small level without counting retardation by natural barriers. Parametric survey of natural barrier performance was also carried out and it shows that two types of rock/groundwater system at different scales can contribute to improving reliability of overall system and are worth further investigation. Major R ampersand D issues were clarified focusing coupled processes in near field and heterogeneity of natural barriers

  8. Performance assessment plans and methods for the Salt Repository Project

    International Nuclear Information System (INIS)

    1984-08-01

    This document presents the preliminary plans and anticipated methods of the Salt Repository Project (SRP) for assessing the postclosure and radiological aspects of preclosure performance of a nuclear waste repository in salt. This plan is intended to be revised on an annual basis. The emphasis in this preliminary effort is on the method of conceptually dividing the system into three subsystems (the very near field, the near field, and the far field) and applying models to analyze the behavior of each subsystem and its individual components. The next revision will contain more detailed plans being developed as part of Site Characterization Plan (SCP) activities. After a brief system description, this plan presents the performance targets which have been established for nuclear waste repositories by regulatory agencies (Chapter 3). The SRP approach to modeling, including sensitivity and uncertainty techniques is then presented (Chapter 4). This is followed by a discussion of scenario analysis (Chapter 5), a presentation of preliminary data needs as anticipated by the SRP (Chapter 6), and a presentation of the SRP approach to postclosure assessment of the very near field, the near field, and the far field (Chapters 7, 8, and 9, respectively). Preclosure radiological assessment is discussed in Chapter 10. Chapter 11 presents the SRP approach to code verification and validation. Finally, the Appendix lists all computer codes anticipated for use in performance assessments. The list of codes will be updated as plans are revised

  9. Assessing Viability and Sustainability: a Systems-based Approach for Deriving Comprehensive Indicator Sets

    Directory of Open Access Journals (Sweden)

    Hartmut Bossel

    2002-01-01

    Full Text Available Performance assessment in holistic approaches such as integrated natural resource management has to deal with a complex set of interacting and self-organizing natural and human systems and agents, all pursuing their own "interests" while also contributing to the development of the total system. Performance indicators must therefore reflect the viability of essential component systems as well as their contributions to the viability and performance of other component systems and the total system under study. A systems-based derivation of a comprehensive set of performance indicators first requires the identification of essential component systems, their mutual (often hierarchical or reciprocal relationships, and their contributions to the performance of other component systems and the total system. The second step consists of identifying the indicators that represent the viability states of the component systems and the contributions of these component systems to the performance of the total system. The search for performance indicators is guided by the realization that essential interests (orientations or orientors of systems and actors are shaped by both their characteristic functions and the fundamental and general properties of their system environments (e.g., normal environmental state, scarcity of resources, variety, variability, change, other coexisting systems. To be viable, a system must devote an essential minimum amount of attention to satisfying the "basic orientors" that respond to the properties of its environment. This fact can be used to define comprehensive and system-specific sets of performance indicators that reflect all important concerns. Often, qualitative indicators and the study of qualitative systems are sufficient for reliable performance assessments. However, this approach can also be formalized for quantitative computer-assisted assessment. Examples are presented of indicator sets for the sustainable development of

  10. Performance of GPS-devices for environmental exposure assessment.

    Science.gov (United States)

    Beekhuizen, Johan; Kromhout, Hans; Huss, Anke; Vermeulen, Roel

    2013-01-01

    Integration of individual time-location patterns with spatially resolved exposure maps enables a more accurate estimation of personal exposures to environmental pollutants than using estimates at fixed locations. Current global positioning system (GPS) devices can be used to track an individual's location. However, information on GPS-performance in environmental exposure assessment is largely missing. We therefore performed two studies. First, a commute-study, where the commute of 12 individuals was tracked twice, testing GPS-performance for five transport modes and two wearing modes. Second, an urban-tracking study, where one individual was tracked repeatedly through different areas, focused on the effect of building obstruction on GPS-performance. The median error from the true path for walking was 3.7 m, biking 2.9 m, train 4.8 m, bus 4.9 m, and car 3.3 m. Errors were larger in a high-rise commercial area (median error=7.1 m) compared with a low-rise residential area (median error=2.2 m). Thus, GPS-performance largely depends on the transport mode and urban built-up. Although ~85% of all errors were 50 m. Modern GPS-devices are useful tools for environmental exposure assessment, but large GPS-errors might affect estimates of exposures with high spatial variability.

  11. Solar energy system performance evaluaton: Seasonal report for Solaron-Akron, Akron, Ohio

    Science.gov (United States)

    1980-05-01

    The operational and thermal performance of the solar energy system by Solaron Corporation is described. The system was designed to provide an 1940 square foot floor area with space heating and domestic hot water for a dual-level single family residence in Akron, Ohio. The solar energy system uses air as the heat transport medium, has a 546 square foot flat plate collector array subsystem, a 270 cubic foot rock thermal storage bin subsystem, a domestic hot water preheat tank, pumps, controls and transport lines. In general, the performance of the Solaron Akron solar energy system was somewhat difficult to assess for the November 1978 through October 1979 time period. The problems relating to the control systems, various solar energy leakages, air flow correction factors and instrumentation cause a significant amount of subjectivity to be involved in the performance assessment for this solar energy system. Had these problems not been present, it is felt that this system would have exhibited a resonably high level of measured performance.

  12. On sustainability assessment of technical systems. Experience from systems analysis with the ORWARE and Ecoeffect tools

    Energy Technology Data Exchange (ETDEWEB)

    Assefa, Getachew [Royal Inst. of Technology, Stockholm (Sweden). Dept. of Chemical Engineering

    2006-06-15

    Engineering research and development work is undergoing a reorientation from focusing on specific parts of different systems to a broader perspective of systems level, albeit at a slower pace. This reorientation should be further developed and enhanced with the aim of organizing and structuring our technical systems in meeting sustainability requirements in face of global ecological threats that have far-reaching social and economic implications, which can no longer be captured using conventional approach of research. Until a list of universally acceptable, clear, and measurable indicators of sustainable development is developed, the work with sustainability metrics should continue to evolve as a relative measure of ecological, economic, and social performance of human activities in general, and technical systems in particular. This work can be done by comparing the relative performance of alternative technologies of providing the same well-defined function or service; or by characterizing technologies that enjoy different levels of societal priorities using relevant performance indicators. In both cases, concepts and methods of industrial ecology play a vital role. This thesis is about the development and application of a systematic approach for the assessment of the performance of technical systems from the perspective of systems analysis, sustainability, sustainability assessment, and industrial ecology. The systematic approach developed and characterized in this thesis advocates for a simultaneous assessment of the ecological, economic, and social dimensions of performance of technologies in avoiding sub-optimization and problem shifting between dimensions. It gives a holistic picture by taking a life cycle perspective of all important aspects. The systematic assessment of technical systems provides an even-handed assessment resulting in a cumulative knowledge. A modular structure of the approach makes it flexible enough in terms of comparing a number of

  13. Performance Spread of Re-entrant System Structures

    DEFF Research Database (Denmark)

    Nielsen, Erland Hejn

    2001-01-01

    and even spreads indicate a situation where the priority policy has a clear tendency often to induce severe virtual bottlenecks into the system at hand, resulting in poor performance. The findings, in summary, are as follows. Almost every priority scheme examined in this simulation study showed...... way to assess the relevance of bad performance structures could then be to simulate a number of scenarios based on a variety of priority policies, different number of machines and job-classes, and let the structure of the job-routes and process times be chosen randomly within the system's realistic...... capabilities. Individual machine utilisation is arbitrarily set to 80% in this study. Each scenario is replicated a 1000 times and the measure used to evaluate the system's performance is the total batch throughput time based on 5000 processed units. It is the spread of this measure that is of interest. Large...

  14. Historical relationship between performance assessment for radioactive waste disposal and other types of risk assessment

    International Nuclear Information System (INIS)

    Rechard, R.P.

    1999-01-01

    This article describes the evolution of the process for assessing the hazards of a geologic disposal system for radioactive waste and, similarly, nuclear power reactors, and the relationship of this process with other assessments of risk, particularly assessments of hazards from manufactured carcinogenic chemicals during use and disposal. This perspective reviews the common history of scientific concepts for risk assessment developed until the 1950s. Computational tools and techniques developed in the late 1950s and early 1960s to analyze the reliability of nuclear weapon delivery systems were adopted in the early 1970s for probabilistic risk assessment of nuclear power reactors, a technology for which behavior was unknown. In turn, these analyses became an important foundation for performance assessment of nuclear waste disposal in the late 1970s. The evaluation of risk to human health and the environment from chemical hazards is built on methods for assessing the dose response of radionuclides in the 1950s. Despite a shared background, however, societal events, often in the form of legislation, have affected the development path for risk assessment for human health, producing dissimilarities between these risk assessments and those for nuclear facilities. An important difference is the regulator's interest in accounting for uncertainty

  15. Safety assessment of envisaged systems for automotive hydrogen supply and utilization

    Energy Technology Data Exchange (ETDEWEB)

    Landucci, Gabriele [Dipartimento di Ingegneria Chimica, Chimica Industriale e Scienza dei Materiali, Universita di Pisa, via Diotisalvi n.2, 56126 Pisa (Italy); Tugnoli, Alessandro; Cozzani, Valerio [Dipartimento di Ingegneria Chimica, Mineraria e delle Tecnologie Ambientali, Alma Mater Studiorum - Universita di Bologna, via Terracini n.28, 40131 Bologna (Italy)

    2010-02-15

    A novel consequence-based approach was applied to the inherent safety assessment of the envisaged hydrogen production, distribution and utilization systems, in the perspective of the widespread hydrogen utilization as a vehicle fuel. Alternative scenarios were assessed for the hydrogen system chain from large scale production to final utilization. Hydrogen transportation and delivery was included in the analysis. The inherent safety fingerprint of each system was quantified by a set of Key Performance Indicators (KPIs). Rules for KPIs aggregation were considered for the overall assessment of the system chains. The final utilization stage resulted by large the more important for the overall expected safety performance of the system. Thus, comparison was carried out with technologies proposed for the use of other low emission fuels, as LPG and natural gas. The hazards of compressed hydrogen-fueled vehicles resulted comparable, while reference innovative hydrogen technologies evidenced a potentially higher safety performance. Thus, switching to the inherently safer technologies currently under development may play an important role in the safety enhancement of hydrogen vehicles, resulting in a relevant improvement of the overall safety performance of the entire hydrogen system. (author)

  16. System Analysis and Risk Assessment System (SARA), Version 4.0

    International Nuclear Information System (INIS)

    Russell, K.D.; Sattison, M.B.; Skinner, N.L.; Stewart, H.D.; Wood, S.T.

    1992-02-01

    This NUREG is the reference manual for the System Analysis and Risk Assessment (SARA) System Version 4.0, a microcomputer-based system used to analyze the safety issues of a family [i.e., a power plant, a manufacturing facility, any facility on which a probabilistic risk assessment (PRA) might be performed]. The SARA data base contains PRA data for the dominant accident sequences of a family and descriptive information about the family including event trees, fault trees, and system model diagrams. The number of facility data bases that can be accessed is limited only by the amount of disk storage available. To simulate changes to family systems, SARA users change the failure rates of initiating and basic events and/or modify the structure of the cut sets that make up the event trees, fault trees, and systems. The user then evaluates the effects of these changes through the recalculation of the resultant accident sequence probabilities and importance measures. The results are displayed in tables and graphs

  17. Performance assessment analyses unique to Department of Energy spent nuclear fuel

    International Nuclear Information System (INIS)

    Loo, H.H.; Duguid, J.J.

    2000-01-01

    This paper describes the iterative process of grouping and performance assessment that has led to the current grouping of the U.S. Department of Energy (DOE) spent nuclear fuel (SNF). The unique sensitivity analyses that form the basis for incorporating DOE fuel into the total system performance assessment (TSPA) base case model are described. In addition, the chemistry that results from dissolution of DOE fuel and high level waste (HLW) glass in a failed co-disposal package, and the effects of disposal of selected DOE SNF in high integrity cans are presented

  18. NASA Human System Risk Assessment Process

    Science.gov (United States)

    Francisco, D.; Romero, E.

    2016-01-01

    NASA utilizes an evidence based system to perform risk assessments for the human system for spaceflight missions. The center of this process is the multi-disciplinary Human System Risk Board (HSRB). The HSRB is chartered from the Chief Health and Medical Officer (OCHMO) at NASA Headquarters. The HSRB reviews all human system risks via an established comprehensive risk and configuration management plan based on a project management approach. The HSRB facilitates the integration of human research (terrestrial and spaceflight), medical operations, occupational surveillance, systems engineering and many other disciplines in a comprehensive review of human system risks. The HSRB considers all factors that influence human risk. These factors include pre-mission considerations such as screening criteria, training, age, sex, and physiological condition. In mission factors such as available countermeasures, mission duration and location and post mission factors such as time to return to baseline (reconditioning), post mission health screening, and available treatments. All of the factors influence the total risk assessment for each human risk. The HSRB performed a comprehensive review of all potential inflight medical conditions and events and over the course of several reviews consolidated the number of human system risks to 30, where the greatest emphasis is placed for investing program dollars for risk mitigation. The HSRB considers all available evidence from human research and, medical operations and occupational surveillance in assessing the risks for appropriate mitigation and future work. All applicable DRMs (low earth orbit for 6 and 12 months, deep space for 30 days and 1 year, a lunar mission for 1 year, and a planetary mission for 3 years) are considered as human system risks are modified by the hazards associated with space flight such as microgravity, exposure to radiation, distance from the earth, isolation and a closed environment. Each risk has a summary

  19. Total-system performance assessment for Yucca Mountain -- SNL second iteration (TSPA-1993); Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, M.L.; Barnard, R.W. [Sandia National Labs., Albuquerque, NM (United States); Gauthier, J.H. [Sandia National Labs., Albuquerque, NM (United States)]|[Spectra Research, Inc. (United States)] [and others

    1994-04-01

    Sandia National Laboratories has completed the second iteration of the periodic total-system performance assessments (TSPA-93) for the Yucca Mountain Site Characterization Project (YMP). Scenarios describing expected conditions (aqueous and gaseous transport of contaminants) and low-probability events (human-intrusion drilling and volcanic intrusion) are modeled. The hydrologic processes modeled include estimates of the perturbations to ambient conditions caused by heating of the repository resulting from radioactive decay of the waste. TSPA-93 incorporates significant new detailed process modeling, including two- and three-dimensional modeling of thermal effects, groundwater flow in the saturated-zone aquifers, and gas flow in the unsaturated zone. Probabilistic analyses are performed for aqueous and gaseous flow and transport, human intrusion, and basaltic magmatic activity. Results of the calculations lead to a number of recommendations concerning studies related to site characterization. Primary among these are the recommendations to obtain better information on percolation flux at Yucca Mountain, on the presence or absence of flowing fractures, and on physical and chemical processes influencing gaseous flow. Near-field thermal and chemical processes, and waste-container degradation are also areas where additional investigations may reduce important uncertainties. Recommendations for repository and waste-package design studies are: (1) to evaluate the performance implications of large-size containers, and (2) to investigate in more detail the implications of high repository thermal power output on the adjacent host rock and on the spent fuel.

  20. Performance of a Fuel-Cell-Powered, Small Electric Airplane Assessed

    Science.gov (United States)

    Berton, Jeffrey J.

    2004-01-01

    Rapidly emerging fuel-cell-power technologies may be used to launch a new revolution of electric propulsion systems for light aircraft. Future small electric airplanes using fuel cell technologies hold the promise of high reliability, low maintenance, low noise, and - with the exception of water vapor - zero emissions. An analytical feasibility and performance assessment was conducted by NASA Glenn Research Center's Airbreathing Systems Analysis Office of a fuel-cell-powered, propeller-driven, small electric airplane based on a model of the MCR-01 two-place kitplane (Dyn'Aero, Darois, France). This assessment was conducted in parallel with an ongoing effort by the Advanced Technology Products Corporation and the Foundation for Advancing Science and Technology Education. Their project - partially funded by a NASA grant - is to design, build, and fly the first manned, continuously propelled, nongliding electric airplane. In our study, an analytical performance model of a proton exchange membrane (PEM) fuel cell propulsion system was developed and applied to a notional, two-place light airplane modeled after the MCR-01 kitplane. The PEM fuel cell stack was fed pure hydrogen fuel and humidified ambient air via a small automotive centrifugal supercharger. The fuel cell performance models were based on chemical reaction analyses calibrated with published data from the fledgling U.S. automotive fuel cell industry. Electric propeller motors, rated at two shaft power levels in separate assessments, were used to directly drive a two-bladed, variable-pitch propeller. Fuel sources considered were compressed hydrogen gas and cryogenic liquid hydrogen. Both of these fuel sources provided pure, contaminant-free hydrogen for the PEM cells.

  1. Hanford immobilized low-activity tank waste performance assessment

    International Nuclear Information System (INIS)

    Mann, F.M.

    1998-01-01

    The Hanford Immobilized Low-Activity Tank Waste Performance Assessment examines the long-term environmental and human health effects associated with the planned disposal of the vitrified low-level fraction of waste presently contained in Hanford Site tanks. The tank waste is the by-product of separating special nuclear materials from irradiated nuclear fuels over the past 50 years. This waste has been stored in underground single and double-shell tanks. The tank waste is to be retrieved, separated into low and high-activity fractions, and then immobilized by private vendors. The US Department of Energy (DOE) will receive the vitrified waste from private vendors and plans to dispose of the low-activity fraction in the Hanford Site 200 East Area. The high-level fraction will be stored at Hanford until a national repository is approved. This report provides the site-specific long-term environmental information needed by the DOE to issue a Disposal Authorization Statement that would allow the modification of the four existing concrete disposal vaults to provide better access for emplacement of the immobilized low-activity waste (ILAW) containers; filling of the modified vaults with the approximately 5,000 ILAW containers and filler material with the intent to dispose of the containers; construction of the first set of next-generation disposal facilities. The performance assessment activity will continue beyond this assessment. The activity will collect additional data on the geotechnical features of the disposal sites, the disposal facility design and construction, and the long-term performance of the waste. Better estimates of long-term performance will be produced and reviewed on a regular basis. Performance assessments supporting closure of filled facilities will be issued seeking approval of those actions necessary to conclude active disposal facility operations. This report also analyzes the long-term performance of the currently planned disposal system as a basis

  2. Hanford immobilized low-activity tank waste performance assessment

    Energy Technology Data Exchange (ETDEWEB)

    Mann, F.M.

    1998-03-26

    The Hanford Immobilized Low-Activity Tank Waste Performance Assessment examines the long-term environmental and human health effects associated with the planned disposal of the vitrified low-level fraction of waste presently contained in Hanford Site tanks. The tank waste is the by-product of separating special nuclear materials from irradiated nuclear fuels over the past 50 years. This waste has been stored in underground single and double-shell tanks. The tank waste is to be retrieved, separated into low and high-activity fractions, and then immobilized by private vendors. The US Department of Energy (DOE) will receive the vitrified waste from private vendors and plans to dispose of the low-activity fraction in the Hanford Site 200 East Area. The high-level fraction will be stored at Hanford until a national repository is approved. This report provides the site-specific long-term environmental information needed by the DOE to issue a Disposal Authorization Statement that would allow the modification of the four existing concrete disposal vaults to provide better access for emplacement of the immobilized low-activity waste (ILAW) containers; filling of the modified vaults with the approximately 5,000 ILAW containers and filler material with the intent to dispose of the containers; construction of the first set of next-generation disposal facilities. The performance assessment activity will continue beyond this assessment. The activity will collect additional data on the geotechnical features of the disposal sites, the disposal facility design and construction, and the long-term performance of the waste. Better estimates of long-term performance will be produced and reviewed on a regular basis. Performance assessments supporting closure of filled facilities will be issued seeking approval of those actions necessary to conclude active disposal facility operations. This report also analyzes the long-term performance of the currently planned disposal system as a basis

  3. Efficiency performance of China's health care delivery system.

    Science.gov (United States)

    Zhang, Luyu; Cheng, Gang; Song, Suhang; Yuan, Beibei; Zhu, Weiming; He, Li; Ma, Xiaochen; Meng, Qingyue

    2017-07-01

    Improving efficiency performance of the health care delivery system has been on the agenda for the health system reform that China initiated in 2009. This study examines the changes in efficiency performance and determinants of efficiency after the reform to provide evidence to assess the progress of the reform from the perspective of efficiency. Descriptive analysis, Data Envelopment Analysis, the Malmquist Index, and multilevel regressions are used with data from multiple sources, including the World Bank, the China Health Statistical Yearbook, and routine reports. The results indicate that over the last decade, health outcomes compared with health investment were relatively higher in China than in most other countries worldwide, and the trend was stable. The overall efficiency and total factor productivity increased after the reform, indicating that the reform was likely to have had a positive impact on the efficiency performance of the health care delivery system. However, the health care delivery structure showed low system efficiency, mainly attributed to the weakened primary health care system. Strengthening the primary health care system is central to enhancing the future performance of China's health care delivery system. Copyright © 2017 John Wiley & Sons, Ltd.

  4. System performance optimization

    International Nuclear Information System (INIS)

    Bednarz, R.J.

    1978-01-01

    The System Performance Optimization has become an important and difficult field for large scientific computer centres. Important because the centres must satisfy increasing user demands at the lowest possible cost. Difficult because the System Performance Optimization requires a deep understanding of hardware, software and workload. The optimization is a dynamic process depending on the changes in hardware configuration, current level of the operating system and user generated workload. With the increasing complication of the computer system and software, the field for the optimization manoeuvres broadens. The hardware of two manufacturers IBM and CDC is discussed. Four IBM and two CDC operating systems are described. The description concentrates on the organization of the operating systems, the job scheduling and I/O handling. The performance definitions, workload specification and tools for the system stimulation are given. The measurement tools for the System Performance Optimization are described. The results of the measurement and various methods used for the operating system tuning are discussed. (Auth.)

  5. A Conceptual Framework for Assessment of Governance Performance of Lake Basins: Towards Transformation to Adaptive and Integrative Governance

    Directory of Open Access Journals (Sweden)

    Peter Emmanuel Cookey

    2016-03-01

    Full Text Available Governance is essential to lake basin management, but it is the most challenged and needs increased attention. Lake Basin Governance performance assessment is designed to measure the progress and impacts of policies, institutions and the roles of various actors in ensuring sustainability. It measures the performance of technical/operational, social/networks, and institutional arrangement that make up the socio-ecological system. Governance performance assessment becomes very necessary with over-emphasis of institutions on resources utilization and exploitation. The purpose of this paper is to present a governance performance assessment framework specifically for lake basins. The Adaptive Integrated Lake Basin Management (AILBM framework is a diagnostic and prescriptive performance assessment tool with an outcome to produce an adaptive and integrative system with equity, inclusiveness, transparency, accountability and flexibility to problem-solving and resilience. A case study on water governance performance assessment of the Songkhla Lake Basin (SLB in Thailand is provided for illustration and application and indicated a poor performance rating on governance in the Basin, revealing gaps, defects, strengths and weaknesses in the current system, necessary to recommend future improvements.

  6. Performance assessment study in PNC/H-3 - A Japanese approach

    International Nuclear Information System (INIS)

    Yamato, A.; Masuda, S.; Umeki, H.; Sakuma, H.; Ishiguro, K.; Sasaki, N.

    1993-01-01

    A generic performance assessment of the geologic disposal system of HLW in Japan has been carried out by Power Reactor and Nuclear Fuel Development Corporation (PNC) according to the overall HLW management program defined by Atomic Energy Commission. PNC's first progress report, H-3, is designed to introduce the status of the research and development work. In Japanese approach to repository development, a major part of the total performance of the disposal system is borne by the near-field while defining a geologic environment that assures and complements the performance of such engineered barrier system. These characteristics can be expected for a variety of geologic environment. A very massive engineered barrier system is introduced to ensure a long-term performance of the disposal system considering a wide range of geologic environment in Japan. The engineered barrier's low hydraulic conductivity limits the groundwater flux, and the constituents of the bentonite buffer the groundwater chemistry to assure good conditions for the longevity of the waste-package and the limitation of radionuclide release. The performance of the natural barrier system coupled with the strong engineered barrier system was investigated by sensitivity analyses. From the analyses, it is indicated that there are realistic combinations of geologic parameter values which could provide a sufficient degree of retardation effect on radionuclide transport only within a range of tens of meters from the engineered barrier system. (author). 9 refs., 7 figs

  7. Makeup water system performance and impact on PWR steam generator corrosion

    International Nuclear Information System (INIS)

    Bell, M.J.; Sawocha, S.G.; Smith, L.A.

    1984-01-01

    The object of this EPRI-funded project was to assess the possible relation of pressurized water reactor (PWR) steam generator corrosion at fresh water sites to makeup water impurity ingress. Makeup water system design, operation and performance reviews were based on site visits, plant design documents, performance records and grab sample analyses. Design features were assessed in terms of their effect on makeup system performance. Attempts were made to correlate the makeup plant source water, system design characteristics, and typical makeup water qualities to steam generator corrosion observations, particularly intergranular attack (IGA). Direct correlations were not made since many variables are involved in the corrosion process and in the case of IGA, the variables have not been clearly established. However, the study did demonstrate that makeup systems can be a significant source of contaminants that are suspected to lead to both IGA and denting. Additionally, it was noted that typical makeup system performance with respect to organic removal was not good. The role of organics in steam generator damage has not been quantified and may deserve further study

  8. Sizing Performance of the Newly Developed Eddy Current System

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Chan Hee; Lee, Hee Jong; Yoo, Hyun Ju; Moon, Gyoon Young; Lee, Tae Hoon [Korea Hydro and Nuclear Power Co., Ltd., Daejeon (Korea, Republic of)

    2013-10-15

    This paper describes the comparison results of sizing performance for two systems. The KHNP developed a new eddy current testing system for the inspection of steam generator tubing in domestic nuclear power plants. The equivalency assessment of the newly developed system with the EPRI-qualified system was already carried out. In this paper, the comparisons of depth-sizing performance for the artificial flaws between two systems were performed. The results show that the newly developed system is in good agreement with the qualified system. Therefore, it is expected that the newly developed eddy current system can be used for the inspection of steam generator tubing in nuclear power plants. There are some non-destructive examination (NDE) methods for the inspection of components in nuclear power plants, such as ultrasonic, radiographic, eddy current testing, etc. The eddy current testing is widely used for the inspection of steam generator (SG) tubing because it offers a relatively low cost approach for high speed, large scale testing of metallic materials in high pressure and temperature engineering systems. The Korea Hydro and Nuclear Power Co., Ltd. (KHNP) developed an eddy current testing system for the inspection of steam generator tubing in nuclear power plants. This system includes not only hardware but software such as the frequency generator and data acquisition-analysis program. The foreign eddy current system developed by ZETEC is currently used for the inspection of steam generator tubing in domestic nuclear power plants. The equivalency assessment between two systems was already carried out in accordance with the EPRI steam generator examination guidelines.

  9. Technical summary of the Performance Assessment Calculational Exercises for 1990 (PACE-90)

    International Nuclear Information System (INIS)

    Barnard, R.W.; Dockery, H.A.

    1991-06-01

    A Performance Assessment Calculational Exercise for 1990 (PACE-90) was coordinated by the Yucca Mountain Site Characterization Project Office for a total-system performance-assessment problem. The primary objectives of the exercise were to develop performance-assessment computational capabilities of the Yucca Mountain Project participates and to aid in identifying critical elements and processes associated with the calculation. The problem defined for PACE-90 was simulation of a ''nominal case'' groundwater flow and transport of a selected group of radionuclides through a portion of Yucca Mountain. Both 1-D and 2-D calculations were run for a modeling period of 100,000 years. The nuclides used, 99 Tc, 135 Cs, 129 I, and 237 Np, were representative of ''classes'' of long-lived nuclides expected to be present in the waste inventory. Movement of the radionuclides was simulated through a detailed hydrostratigraphy developed from Yucca Mountain data specifically for this exercise. The results showed that, for the specified conditions with the conceptual models used in the problem, no radioactive contamination reached the water table, 230 m below the repository. However, due to the unavailability of sufficient site-specific data, the results of this exercise cannot be considered a comprehensive total-system- performance assessment of the Yucca Mountain site as a high-level- waste repository. 46 refs., 94 figs., 19 tabs

  10. Studies of natural analogues and geological systems. Their importance to performance assessment

    International Nuclear Information System (INIS)

    Brandberg, F.; Grundfelt, B.; Hoeglund, L.O.; Skagius, K.; Karlsson, Fred; Smellie, J.

    1992-04-01

    This review has involved studies of natural analogues and natural geological systems leading to the identification and quantification of processes and features of importance to the performance and safety of repositories for radioactive waste. The features and processes selected for the study comprise general geochemical issues related to the performance of the near- and of the far-field, the performance and durability of construction materials and the effects of glaciation. For each of these areas a number of potentially important processes for repository performance have been described, and evidence for their existence, as well as quantification of parameters of models describing the processes, have been sought from major natural analogue studies and site investigations. The review has aimed at covering a relatively broad range of issues at the expense of in-depth analysis. The quantitative data presented are in most cases compilations of data from the literature; in a few cases results of evaluations made within the current project are included. The results of the study show that studies of natural analogues and natural geological systems have provided significant information regarding many issues of importance to repository performance. In several cases the evidence from natural analogues has demonstrated that processes assumed to take place in repositories actually occur in natural systems or under conditions similar to those predicted to prevail in a future repository. One example of such a process is coprecipitation of fission products and ferric oxyhydroxides as an analogue to corrosion products from a steel canister. In addition, the study of concentration gradients of uranium and other trace substances in the rock surrounding groundwater conduits confirm that matrix diffusion occurs in nature and that the diffusivities in the rock matrix measured in the laboratory are consistent with the observations in nature

  11. 75 FR 39036 - Public Housing Assessment System (PHAS): Management Operations Certification

    Science.gov (United States)

    2010-07-07

    ... System (PHAS): Management Operations Certification AGENCY: Office of the Chief Information Officer, HUD... management operations. The information is used to assess the management performance of PHAs. DATES: Comments... following information: Title of Proposal: Public Housing Assessment System (PHAS): Management Operations...

  12. Performing Probabilistic Risk Assessment Through RAVEN

    Energy Technology Data Exchange (ETDEWEB)

    A. Alfonsi; C. Rabiti; D. Mandelli; J. Cogliati; R. Kinoshita

    2013-06-01

    The Reactor Analysis and Virtual control ENviroment (RAVEN) code is a software tool that acts as the control logic driver and post-processing engine for the newly developed Thermal-Hydraulic code RELAP-7. RAVEN is now a multi-purpose Probabilistic Risk Assessment (PRA) software framework that allows dispatching different functionalities: Derive and actuate the control logic required to simulate the plant control system and operator actions (guided procedures), allowing on-line monitoring/controlling in the Phase Space Perform both Monte-Carlo sampling of random distributed events and Dynamic Event Tree based analysis Facilitate the input/output handling through a Graphical User Interface (GUI) and a post-processing data mining module

  13. Probabilistic performance assessments for evaluations of the Yucca Mountain site

    International Nuclear Information System (INIS)

    Rickertsen, L.D.; Noronha, C.J.

    1992-01-01

    Site suitability evaluations are conducted to determine if a repository system at a particular site will be able to meet the performance objectives for that system. Early evaluations to determine if the Yucca Mountain site is suitable for repository development have been made in the face of large uncertainties in site features and conditions. Because of these large uncertainties, the evaluations of the site have been qualitative in nature, focusing on the presence or absence of particular features or conditions thought to be important to performance, rather than on results of quantitative performance assessments. Such a qualitative approach was used in the recently completed evaluation of the Yucca Mountain site, the Early Site-Suitability Evaluation (ESSE). In spite of the qualitative approach, the ESSE was able to conclude that no disqualifying conditions are likely to be present at the site and that all of the geologic conditions that would qualify the site are likely to be met. At the same time, because of the qualitative nature of the approach used in the ESSE, the precise importance of the identified issues relative to performance could not be determined. Likewise, the importance of the issues relative to one another could not be evaluated, and, other than broad recommendations, specific priorities for future testing could not be set. The authors have conducted quantitative performance assessments for the Yucca Mountain site to address these issues

  14. Geographic information systems - tool for evaluation of the hydro-energy performance of water supply systems

    Directory of Open Access Journals (Sweden)

    Aline Christian Pimentel Almeida Santos

    2017-05-01

    Full Text Available The most relevant challenges in the water supply system (WSS are high water losses and the waste of electric energy. This paper aimed to assess the capacity of the Geographic Information System (GIS in the analysis of the hydro-energy performance of WSSs. The Stage 1 comprises the selection of data and the respective hydro-energy indexes are defined; cartographic data are defined in Stage 2 and a geo-referenced database is constructed in Stage 3. In the stage 4, the data of the Central Water Supply Zone administered by the Water Works Company of the state of Pará in Belém, Brazil were employed to assess its applicability, in which the sectors with the worst hydro-energy performance were identified, such as Sector 9, with the highest water loss rates (59.11% and electric energy consumption per m3 of water produced (1.57 kwh m-³. The results shows that geo-referential assessment of the hydro-energy performance of WSSs provided accurate information for decision-taking related to the rational use of water and electricity in the systems.

  15. Diagnostic performance of a novel cadmium-zinc-telluride gamma camera system assessed using fractional flow reserve.

    Science.gov (United States)

    Tanaka, Hirokazu; Chikamori, Taishiro; Tanaka, Nobuhiro; Hida, Satoshi; Igarashi, Yuko; Yamashita, Jun; Ogawa, Masashi; Shiba, Chie; Usui, Yasuhiro; Yamashina, Akira

    2014-01-01

    Although the novel cadmium-zinc-telluride (CZT) camera system provides excellent image quality, its diagnostic value using thallium-201 as assessed on coronary angiography (CAG) and fractional flow reserve (FFR) has not been validated. METHODS AND RESULTS: To evaluate the diagnostic accuracy of the CZT ultrafast camera system (Discovery NM 530c), 95 patients underwent stress thallium-201 single-photon emission computed tomography (SPECT) and then CAG within 3 months. Image acquisition was performed in the supine and prone positions after stress for 5 and 3 min, respectively, and in the supine position at rest for 10 min. Significant stenosis was defined as ≥90% diameter narrowing on visual estimation, or a lesion with <90% and ≥50% stenosis and FFR ≤0.75. To detect individual coronary stenosis, the respective sensitivity, specificity, and accuracy were 90%, 64%, and 78% for left anterior descending coronary artery stenosis, 78%, 84%, and 81% for left circumflex stenosis, and 83%, 47%, and 60% for right coronary artery (RCA) stenosis. The combination of prone and supine imaging had a higher specificity for RCA disease than supine imaging alone (65% vs. 47%), with an improvement in accuracy from 60% to 72%. Using thallium-201 with short acquisition time, combined with prone imaging, CZT SPECT had a high diagnostic yield in detecting significant coronary stenosis as assessed using FFR.

  16. Reliability assessment of Passive Containment Cooling System of an Advanced Reactor using APSRA methodology

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Mukesh, E-mail: mukeshd@barc.gov.in [Reactor Engineering Division, Bhabha Atomic Research Centre, Mumbai 400085 (India); Chakravarty, Aranyak [School of Nuclear Studies and Application, Jadavpur University, Kolkata 700032 (India); Nayak, A.K. [Reactor Engineering Division, Bhabha Atomic Research Centre, Mumbai 400085 (India); Prasad, Hari; Gopika, V. [Reactor Safety Division, Bhabha Atomic Research Centre, Mumbai 400085 (India)

    2014-10-15

    Highlights: • The paper deals with the reliability assessment of Passive Containment Cooling System of Advanced Heavy Water Reactor. • Assessment of Passive System ReliAbility (APSRA) methodology is used for reliability assessment. • Performance assessment of the PCCS is initially performed during a postulated design basis LOCA. • The parameters affecting the system performance are then identified and considered for further analysis. • The failure probabilities of the various components are assessed through a classical PSA treatment using generic data. - Abstract: Passive Systems are increasingly playing a prominent role in the advanced nuclear reactor systems and are being utilised in normal operations as well as safety systems of the reactors following an accident. The Passive Containment Cooling System (PCCS) is one of the several passive safety features in an Advanced Reactor (AHWR). In this paper, the APSRA methodology has been employed for reliability evaluation of the PCCS of AHWR. Performance assessment of the PCCS is initially performed during a postulated design basis LOCA using the best-estimate code RELAP5/Mod 3.2. The parameters affecting the system performance are then identified and considered for further analysis. Based on some pre-determined failure criterion, the failure surface for the system is predicted using the best-estimate code taking into account the deviations of the identified parameters from their nominal states as well as the model uncertainties inherent to the best estimate code. Root diagnosis is then carried out to determine the various failure causes, which occurs mainly due to malfunctioning of mechanical components. The failure probabilities of the various components are assessed through a classical PSA treatment using generic data. The reliability of the PCCS is then evaluated from the probability of availability of these components.

  17. Reliability assessment of Passive Containment Cooling System of an Advanced Reactor using APSRA methodology

    International Nuclear Information System (INIS)

    Kumar, Mukesh; Chakravarty, Aranyak; Nayak, A.K.; Prasad, Hari; Gopika, V.

    2014-01-01

    Highlights: • The paper deals with the reliability assessment of Passive Containment Cooling System of Advanced Heavy Water Reactor. • Assessment of Passive System ReliAbility (APSRA) methodology is used for reliability assessment. • Performance assessment of the PCCS is initially performed during a postulated design basis LOCA. • The parameters affecting the system performance are then identified and considered for further analysis. • The failure probabilities of the various components are assessed through a classical PSA treatment using generic data. - Abstract: Passive Systems are increasingly playing a prominent role in the advanced nuclear reactor systems and are being utilised in normal operations as well as safety systems of the reactors following an accident. The Passive Containment Cooling System (PCCS) is one of the several passive safety features in an Advanced Reactor (AHWR). In this paper, the APSRA methodology has been employed for reliability evaluation of the PCCS of AHWR. Performance assessment of the PCCS is initially performed during a postulated design basis LOCA using the best-estimate code RELAP5/Mod 3.2. The parameters affecting the system performance are then identified and considered for further analysis. Based on some pre-determined failure criterion, the failure surface for the system is predicted using the best-estimate code taking into account the deviations of the identified parameters from their nominal states as well as the model uncertainties inherent to the best estimate code. Root diagnosis is then carried out to determine the various failure causes, which occurs mainly due to malfunctioning of mechanical components. The failure probabilities of the various components are assessed through a classical PSA treatment using generic data. The reliability of the PCCS is then evaluated from the probability of availability of these components

  18. Performance testing SPECT systems: Recent developments

    International Nuclear Information System (INIS)

    Todd-Pokropek, A.

    1985-01-01

    A protocol is used to test as many currently available systems as possible, including both rotating gamma camera systems from GE, Siemens, Toshiba, Technicare, Elscint, Philips, Picker, etc, and single/multi slice system such as the Medimatic. This paper indicates changes that have occurred with respect to preliminary results previously published. Reconstructions were performed in a standard manner, using a Ramp filter and without attenuation correction, in order to reduce the effect of differences in software. The Jaszczak phantom was used to assess overall image quality. Tests were performed using the different collimators available. Image quality improved with better spatial resolution, even at the expense of sensitivity. Non-circular orbits, where available, were tested, and resolution was comparing for various positions and directions. With double headed systems, the results obtained were compared to those using a single head alone. Some gain in image quality seems to have been achieved by better uniformity resulting from improved correction circuitry, by the use of non-circular orbits, and from scatter correction. Potential still exists to improve collimator design

  19. Performance Objective for Tank Farm Closure Risk Assessments

    International Nuclear Information System (INIS)

    MANN, F.M.; KNEPP, A.J.; BADDEN, J.

    2003-01-01

    To be meaningful, results from a numeric risk assessment of the consequences of an action must be compared against the standards for such an action. That is, before one disposes of waste or closes a facility with waste, one must show that the disposal or closure action protects the public health and safety and the environment. These standards are called performance objectives. Regulations requiring performing performance assessments, (whether federal ones like the Department of Energy [DOE] Order 435.1, Radioactive Waste Management and its implementing guides or Washington State ones like the regulations implementing the Washington Administrative Code [WAC] 173-340 ''Model Toxics Control Act - Cleanup''), usually require that the determination of performance objectives be one of the first steps performed. These performance objectives not only set comparison level for the numeric results, but also define the media, pathways, exposure scenarios (receptors), spatial locations, and times that the performance assessment must consider. Thus, a performance objective consists of a compliance level, place(s) of compliance, and time(s) of compliance. Performance objectives are not the levels that a regulatory agency will enforce in a permit or authorization. Those levels, often called enforcement levels, will be set in the permit or authorization. Rather, performance objectives are those levels against which the results of the numeric simulation will be compared to judge the success of the proposed cleanup or disposal actions. Additional comparison levels may be requested for information purposes, but are not officially part of the decision on the adequacy of the proposed action. To emphasize that the performance objectives discussed in this document are not regulatory performance objectives, the three components of the performance objective will be renamed in this document as assessment standard, point(s) of assessment, and time(s) of assessment. However, whenever

  20. Scientific method, adversarial system, and technology assessment

    Science.gov (United States)

    Mayo, L. H.

    1975-01-01

    A basic framework is provided for the consideration of the purposes and techniques of scientific method and adversarial systems. Similarities and differences in these two techniques of inquiry are considered with reference to their relevance in the performance of assessments.

  1. Development of a system utilizing data of risk assessment

    International Nuclear Information System (INIS)

    Nagasaka, Akihiko; Takano, Kenichi; Ebisu, Mitsuhiro; Aikawa, Tadashi; Hayase, Kenichi

    2004-01-01

    This report deals with a concrete method of utilizing data of risk assessment. First, the authors point out the necessity to assess all stages of jobs (planning, meeting with contractors, performing phase of task, etc.) in risk assessment bout jobs in electric power company, because most jobs are performed by contract system and risks of a job are distributed over electric company, contractors and subcontractors. Secondly, risks estimated from past accidents and near-miss events must be included. If these 2 requirements are fulfilled, data of risk assessment can be more useful. Then below 4 forms of present data of risk assessment were developed. A form to be used in job planning stage in electric companies for efficient investment planning in safety measures. A form to be used in meetings between electric companies and contractors for checking accident prevention methods. A form to be used in meetings between contractors and subcontractors for enhancing a shared awareness of risk. A form to be used in tool box meetings for confirming safe condition and inheriting of ability of risk perception. Additionally, a data base system of risk assessment about 4 jobs was developed. This system prints out about 4 forms for each job and is useful for PDCA of safety activities. (author)

  2. Assessing Risk-Based Performance Indicators in Safety-Critical Systems for Nuclear Power Plants

    OpenAIRE

    TONT Gabriela

    2011-01-01

    The paper proposes framework for a multidisciplinary nuclear risk and safety assessment by modeling uncertainty and combining diverse evidence provided in such a way that it could be used to represent an entire argument about a system's dependability. The identified safety issues are being treated by means of probabilistic safety assessment (PSA). The behavior simulation of power plant in thepresence of risk factors is analyzed from the vulnerability, risk and functional safety viewpoints, hi...

  3. Performance objectives for the Hanford Immobilized Low-Activity Waste (ILAW) performance assessment

    International Nuclear Information System (INIS)

    MANN, F.M.

    1999-01-01

    Performance objectives for the disposal of low activity waste from Hanford Waste Tanks have been developed. These objectives have been based on DOE requirements, programmatic requirements, and public involvement. The DOE requirements include regulations that direct the performance assessment and are cited within the Radioactive Waste Management Order (DOE Order 435.1). Performance objectives for other DOE complex performance assessments have been included

  4. The use of performance assessments in Yucca Mountain repository waste package design activities

    International Nuclear Information System (INIS)

    Jardine, L.J.

    1990-01-01

    The Yucca Mountain Project is developing performance assessment approaches as part of the evaluations of the suitability of Yucca Mountain as a repository site. Lawrence Livermore National Laboratory is developing design concepts and the scientific performance assessment methodologies and techniques used for the waste package and engineered barrier system components. This paper presents an overview of the approach under development for postclosure performance assessments that will guide the conceptual design activities and assist in the site suitability evaluations. This approach includes establishing and modeling for the long time periods required by regulations: near-field environment characteristics surrounding the emplaced wastes; container materials performance responses; and waste form properties. All technical work is being done under a fully qualified quality assurance program

  5. Scientific investigation plan for NNWSI WBS element 1.2.2.5.L: NNWSI waste package performance assessment: Revision 1

    International Nuclear Information System (INIS)

    Eggert, K.G.; O'Connell, W.J.; Lappa, D.A.

    1986-01-01

    Waste package performance assessment contains three broad categories of activities. These activities are: (1) development of a hydrothermal flow and transport model to test concepts to be used in establishing boundary conditions for performance calculations, and to interface EBS release calculations with total system performance calculations; (2) development of a waste package systems model to provide integrated deterministic assessments of performance and analyses of waste package designs; and (3) development of an uncertainty methodology for combination with the system model to perform probabilistic reliability and performance analysis waste package designs. The first category contains activities that aid in determining the scope of a separate, simplified set of hydrologic calculations needed to characterize the waste package environment for performance assessment calculations. The last two activity categories are directly concerned with waste package performance calculations. A rationale for each activity under these groups is presented. All of the activities of performance assessment are either code development or analyses of waste package problems

  6. PRECIS -- A probabilistic risk assessment system

    International Nuclear Information System (INIS)

    Peterson, D.M.; Knowlton, R.G. Jr.

    1996-01-01

    A series of computer tools has been developed to conduct the exposure assessment and risk characterization phases of human health risk assessments within a probabilistic framework. The tools are collectively referred to as the Probabilistic Risk Evaluation and Characterization Investigation System (PRECIS). With this system, a risk assessor can calculate the doses and risks associated with multiple environmental and exposure pathways, for both chemicals and radioactive contaminants. Exposure assessment models in the system account for transport of contaminants to receptor points from a source zone originating in unsaturated soils above the water table. In addition to performing calculations of dose and risk based on initial concentrations, PRECIS can also be used in an inverse manner to compute soil concentrations in the source area that must not be exceeded if prescribed limits on dose or risk are to be met. Such soil contaminant levels, referred to as soil guidelines, are computed for both single contaminants and chemical mixtures and can be used as action levels or cleanup levels. Probabilistic estimates of risk, dose and soil guidelines are derived using Monte Carlo techniques

  7. Performance Assessment Strategy Plan for the Geologic Repository Program

    International Nuclear Information System (INIS)

    1990-01-01

    Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs

  8. Knowledge based system for fouling assessment of power plant boiler

    International Nuclear Information System (INIS)

    Afgan, N.H.; He, X.; Carvalho, M.G.; Azevedo, J.L.T.

    1999-01-01

    The paper presents the design of an expert system for fouling assessment in power plant boilers. It is an on-line expert system based on selected criteria for the fouling assessment. Using criteria for fouling assessment based on 'clean' and 'not-clean' radiation heat flux measurements, the diagnostic variable are defined for the boiler heat transfer surface. The development of the prototype knowledge-based system for fouling assessment in power plants boiler comprise the integrations of the elements including knowledge base, inference procedure and prototype configuration. Demonstration of the prototype knowledge-based system for fouling assessment was performed on the Sines power plant. It is a 300 MW coal fired power plant. 12 fields are used with 3 on each side of boiler

  9. Loose and Tight GNSS/INS Integrations: Comparison of Performance Assessed in Real Urban Scenarios.

    Science.gov (United States)

    Falco, Gianluca; Pini, Marco; Marucco, Gianluca

    2017-01-29

    Global Navigation Satellite Systems (GNSSs) remain the principal mean of positioning in many applications and systems, but in several types of environment, the performance of standalone receivers is degraded. Although many works show the benefits of the integration between GNSS and Inertial Navigation Systems (INSs), tightly-coupled architectures are mainly implemented in professional devices and are based on high-grade Inertial Measurement Units (IMUs). This paper investigates the performance improvements enabled by the tight integration, using low-cost sensors and a mass-market GNSS receiver. Performance is assessed through a series of tests carried out in real urban scenarios and is compared against commercial modules, operating in standalone mode or featuring loosely-coupled integrations. The paper describes the developed tight-integration algorithms with a terse mathematical model and assesses their efficacy from a practical perspective.

  10. PERFORM: A System for Monitoring, Assessment and Management of Patients with Parkinson’s Disease

    Directory of Open Access Journals (Sweden)

    Alexandros T. Tzallas

    2014-11-01

    Full Text Available In this paper, we describe the PERFORM system for the continuous remote monitoring and management of Parkinson’s disease (PD patients. The PERFORM system is an intelligent closed-loop system that seamlessly integrates a wide range of wearable sensors constantly monitoring several motor signals of the PD patients. Data acquired are pre-processed by advanced knowledge processing methods, integrated by fusion algorithms to allow health professionals to remotely monitor the overall status of the patients, adjust medication schedules and personalize treatment. The information collected by the sensors (accelerometers and gyroscopes is processed by several classifiers. As a result, it is possible to evaluate and quantify the PD motor symptoms related to end of dose deterioration (tremor, bradykinesia, freezing of gait (FoG as well as those related to over-dose concentration (Levodopa-induced dyskinesia (LID. Based on this information, together with information derived from tests performed with a virtual reality glove and information about the medication and food intake, a patient specific profile can be built. In addition, the patient specific profile with his evaluation during the last week and last month, is compared to understand whether his status is stable, improving or worsening. Based on that, the system analyses whether a medication change is needed—always under medical supervision—and in this case, information about the medication change proposal is sent to the patient. The performance of the system has been evaluated in real life conditions, the accuracy and acceptability of the system by the PD patients and healthcare professionals has been tested, and a comparison with the standard routine clinical evaluation done by the PD patients’ physician has been carried out. The PERFORM system is used by the PD patients and in a simple and safe non-invasive way for long-term record of their motor status, thus offering to the clinician a

  11. Knowledge-Based Systems for the Assessment and Management of Bridge Structures

    DEFF Research Database (Denmark)

    Miyamoto, A.; Thoft-Christensen, Palle; Yan, B.

    2004-01-01

    . The aim of this paper is to summarize the finding of up-to-date research articles concerning the application of knowledge-based systems to assessment and management of structures and to illustrate the potential of such systems in the structural engineering. Two modern bridge management systems (BMS......It is becoming an important social problem to make maintenance and rehabilitation of existing infrastructures such as bridges, buildings, etc. The kernel of such structure management is to develop a method of safety assessment on items which include remaining life and load carrying capacity......'s) are presented in the paper. The first is a BMS to assess the performance and derive optimal strategies for inspection and maintenance of concrete structures using reliability based and knowledge based systems. The second is the concrete bridge rating expert system (BREX) to evaluate the performance of existing...

  12. Preliminary melter performance assessment report

    International Nuclear Information System (INIS)

    Elliott, M.L.; Eyler, L.L.; Mahoney, L.A.; Cooper, M.F.; Whitney, L.D.; Shafer, P.J.

    1994-08-01

    The Melter Performance Assessment activity, a component of the Pacific Northwest Laboratory's (PNL) Vitrification Technology Development (PVTD) effort, was designed to determine the impact of noble metals on the operational life of the reference Hanford Waste Vitrification Plant (HWVP) melter. The melter performance assessment consisted of several activities, including a literature review of all work done with noble metals in glass, gradient furnace testing to study the behavior of noble metals during the melting process, research-scale and engineering-scale melter testing to evaluate effects of noble metals on melter operation, and computer modeling that used the experimental data to predict effects of noble metals on the full-scale melter. Feed used in these tests simulated neutralized current acid waste (NCAW) feed. This report summarizes the results of the melter performance assessment and predicts the lifetime of the HWVP melter. It should be noted that this work was conducted before the recent Tri-Party Agreement changes, so the reference melter referred to here is the Defense Waste Processing Facility (DWPF) melter design

  13. Performance Assessment Institute-NV

    Energy Technology Data Exchange (ETDEWEB)

    Lombardo, Joesph [Univ. of Nevada, Las Vegas, NV (United States)

    2012-12-31

    The National Supercomputing Center for Energy and the Environment’s intention is to purchase a multi-purpose computer cluster in support of the Performance Assessment Institute (PA Institute). The PA Institute will serve as a research consortium located in Las Vegas Nevada with membership that includes: national laboratories, universities, industry partners, and domestic and international governments. This center will provide a one-of-a-kind centralized facility for the accumulation of information for use by Institutions of Higher Learning, the U.S. Government, and Regulatory Agencies and approved users. This initiative will enhance and extend High Performance Computing (HPC) resources in Nevada to support critical national and international needs in "scientific confirmation". The PA Institute will be promoted as the leading Modeling, Learning and Research Center worldwide. The program proposes to utilize the existing supercomputing capabilities and alliances of the University of Nevada Las Vegas as a base, and to extend these resource and capabilities through a collaborative relationship with its membership. The PA Institute will provide an academic setting for interactive sharing, learning, mentoring and monitoring of multi-disciplinary performance assessment and performance confirmation information. The role of the PA Institute is to facilitate research, knowledge-increase, and knowledge-sharing among users.

  14. Radionuclide release rates from spent fuel for performance assessment modeling

    International Nuclear Information System (INIS)

    Curtis, D.B.

    1994-01-01

    In a scenario of aqueous transport from a high-level radioactive waste repository, the concentration of radionuclides in water in contact with the waste constitutes the source term for transport models, and as such represents a fundamental component of all performance assessment models. Many laboratory experiments have been done to characterize release rates and understand processes influencing radionuclide release rates from irradiated nuclear fuel. Natural analogues of these waste forms have been studied to obtain information regarding the long-term stability of potential waste forms in complex natural systems. This information from diverse sources must be brought together to develop and defend methods used to define source terms for performance assessment models. In this manuscript examples of measures of radionuclide release rates from spent nuclear fuel or analogues of nuclear fuel are presented. Each example represents a very different approach to obtaining a numerical measure and each has its limitations. There is no way to obtain an unambiguous measure of this or any parameter used in performance assessment codes for evaluating the effects of processes operative over many millennia. The examples are intended to suggest by example that in the absence of the ability to evaluate accuracy and precision, consistency of a broadly based set of data can be used as circumstantial evidence to defend the choice of parameters used in performance assessments

  15. Technology-Supported Performance Assessments for Middle School Geoscience

    Science.gov (United States)

    Zalles, D. R.; Quellmalz, E.; Rosenquist, A.; Kreikemeier, P.

    2002-12-01

    Under funding from the World Bank, the U.S. Department of Education, the National Science Foundation, and the Federal Government's Global Learning and Observations to Benefit the Environment Program (GLOBE), SRI International has developed and piloted web-accessible performance assessments that measure K-12 students' abilities to use learning technologies to reason with scientific information and communicate evidence-based conclusions to scientific problems. This presentation will describe the assessments that pertain to geoscience at the middle school level. They are the GLOBE Assessments and EPA Phoenix, an instantiation of SRI's model of assessment design known as Integrative Performance Assessments in Technology (IPAT). All are publicly-available on the web. GLOBE engages students in scientific data collection and observation about the environment. SRI's classroom assessments for GLOBE provide sample student assessment tools and frameworks that allow teachers and students to assess how well students can use the data in scientific inquiry projects. Teachers can use classroom assessment tools on the site to develop integrated investigations for assessing GLOBE within their particular science curricula. Rubrics are provided for measuring students' GLOBE-related skills, and alignments are made to state, national, and international science standards. Sample investigations are provided about atmosphere, hydrology, landcover, soils, earth systems, and visualizations. The IPAT assessments present students with engaging problems rooted in science or social science content, plus sets of tasks and questions that require them to gather relevant information on the web, use reasoning strategies to analyze and interpret the information, use spreadsheets, word processors, and other productivity tools, and communicate evidence-based findings and recommendations. In the process of gathering information and drawing conclusions, students are assessed on how well they can operate

  16. Use of simplified models in the performance assessment of a high-level waste repository system in Japan

    International Nuclear Information System (INIS)

    Pensado, Osvaldo; Mohanty, Sitakanta; Kanno, Takeshi; Tochigi, Yoshikatsu

    2005-01-01

    This paper explores simplifications to the H12 performance assessment model to enhance performance in Monte Carlo analyses. It is shown that similar reference case results to those of the H12 model can be derived by describing the buffer material surrounding a waste package as a planar body. Other possible simplifications to the performance assessment model in areas related to the stratification of the host rock transmissivity domain and solubility constraints in the buffer material are explored. (author)

  17. Performance Assessment for e-Government Services: An Experience Report

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Yan; Zhu, Liming; Gorton, Ian

    2007-08-14

    The transformation and integration of government services, enabled by the use of new technologies such as application servers and Web services, is fundamental to reduce the cost of government and improving service outcomes to citizens. Many core Government information systems comprise applications running on legacy mainframes, databases and transaction processing monitors. As Governments worldwide provide direct access over the Internet to these legacy applications from the general public, they may be exposed to workloads well above the origin design parameters of these back-end systems. This creates a significant risk of high profile failures for Government agencies whose newly integrated systems become overloaded. In this paper we describe how we conducted a performance assessment of a business-critical, Internet-facing Web services that integrated new and legacy systems from two Australian Government agencies. We leveraged prototype tools from our own research along with known techniques in performance modeling. We were able to clearly demonstrate that the existing hardware and software would be adequate to handle the predicted workload for the next financial year. We were also able to do ‘what-if’ analysis and predict how the system can perform with alternative strategies to scale the system. We conclude by summarizing the lessons learnt, including the importance of architecture visibility, benchmarking data quality, and measurement feasibility due to issues of outsourcing, privacy legislation and cross-agency involvement.

  18. Measurement of health system performance at district level: A study protocol

    Directory of Open Access Journals (Sweden)

    Atul Sharma

    2018-01-01

    Full Text Available Background: Limited efforts have been observed in low and middle income countries to undertake health system performance assessment at district level. Absence of a comprehensive data collection tool and lack of a standardised single summary measure defining overall performance are some of the main problems. Present study has been undertaken to develop a summary composite health system performance index at district level. Methods: A broad range of indicators covering all six domains as per building block framework were finalized by an expert panel. The domains were classified into twenty sub-domains, with 70 input and process indicators to measure performance. Seven sub-domains for assessing health system outputs and outcomes were identified, with a total of 28 indicators. Districts in Haryana state from north India were selected for the study. Primary and secondary data will be collected from 378 health facilities, district and state health directorate headquarters. Indicators will be normalized, aggregated to generate composite performance index at district level. Domain specific scores will present the quality of individual building block domains in the public health system. Robustness of the results will be checked using sensitivity analysis. Expected impact for public health: The study presents a methodology for comprehensive assessment of all health system domains on basis of input, process, output and outcome indicators which has never been reported from India. Generation of this index will help identify policy and implementation areas of concern and point towards potential solutions. Results may also help understand relationships between individual building blocks and their sub-components.

  19. System of tactical assessment in Soccer (FUT-SAT: Development and preliminary validation

    Directory of Open Access Journals (Sweden)

    I.T. Costa

    2011-01-01

    Full Text Available The purpose of this paper was to report the development and preliminary validation of tactical assessment system in Soccer and highlight its advantages. The validation process followed five perspectives of the concept of validity that consider the value of heuristic methods and the importance of the description of behavior performed in playing situations. Thus, the process of validation was focused on four points: i acceptability and reasonableness of the test perceived by players; ii analysis of content of assessment tool through a panel of experts; iii potential of the assessment tool to discriminate the quality of the performance of players; iv observation reliability. The results displayed values higher than 0.63 for correlation between the evaluations of coaches and the system. It shows the potential of this system to distinguish the performances of players based on the evaluations of coaches. The players who performed the field test agreed with its physical demands and spatial and normative configurations. All experts endorsed the categories and variables of this system. The reliabilities showed values higher than 0.79 for intra and inter-observers. Therefore, it is possible to conclude that the system is valid and reliable for the assessment of the tactical behavior of soccer players.

  20. Determination of Safety Performance Grade of NPP Using Integrated Safety Performance Assessment (ISPA) Program

    International Nuclear Information System (INIS)

    Chung, Dae Wook

    2011-01-01

    Since the beginning of 2000, the safety regulation of nuclear power plant (NPP) has been challenged to be conducted more reasonable, effective and efficient way using risk and performance information. In the United States, USNRC established Reactor Oversight Process (ROP) in 2000 for improving the effectiveness of safety regulation of operating NPPs. The main idea of ROP is to classify the NPPs into 5 categories based on the results of safety performance assessment and to conduct graded regulatory programs according to categorization, which might be interpreted as 'Graded Regulation'. However, the classification of safety performance categories is highly comprehensive and sensitive process so that safety performance assessment program should be prepared in integrated, objective and quantitative manner. Furthermore, the results of assessment should characterize and categorize the actual level of safety performance of specific NPP, integrating all the substantial elements for assessing the safety performance. In consideration of particular regulatory environment in Korea, the integrated safety performance assessment (ISPA) program is being under development for the use in the determination of safety performance grade (SPG) of a NPP. The ISPA program consists of 6 individual assessment programs (4 quantitative and 2 qualitative) which cover the overall safety performance of NPP. Some of the assessment programs which are already implemented are used directly or modified for incorporating risk aspects. The others which are not existing regulatory programs are newly developed. Eventually, all the assessment results from individual assessment programs are produced and integrated to determine the safety performance grade of a specific NPP

  1. Environmental performance of electricity storage systems for grid applications, a life cycle approach

    International Nuclear Information System (INIS)

    Oliveira, L.; Messagie, M.; Mertens, J.; Laget, H.; Coosemans, T.; Van Mierlo, J.

    2015-01-01

    Highlights: • Large energy storage systems: environmental performance under different scenarios. • ReCiPe midpoint and endpoint impact assessment results are analyzed. • Energy storage systems can replace peak power generation units. • Energy storage systems and renewable energy have the best environmental scores. • Environmental performance of storage systems is application dependent. - Abstract: In this paper, the environmental performance of electricity storage technologies for grid applications is assessed. Using a life cycle assessment methodology we analyze the impacts of the construction, disposal/end of life, and usage of each of the systems. Pumped hydro and compressed air storage are studied as mechanical storage, and advanced lead acid, sodium sulfur, lithium-ion and nickel–sodium-chloride batteries are addressed as electrochemical storage systems. Hydrogen production from electrolysis and subsequent usage in a proton exchange membrane fuel cell are also analyzed. The selected electricity storage systems mimic real world installations in terms of capacity, power rating, life time, technology and application. The functional unit is one kW h of energy delivered back to the grid, from the storage system. The environmental impacts assessed are climate change, human toxicity, particulate matter formation, and fossil resource depletion. Different electricity mixes are used in order to exemplify scenarios where the selected technologies meet specific applications. Results indicate that the performance of the storage systems is tied to the electricity feedstocks used during use stage. Renewable energy sources have lower impacts throughout the use stage of the storage technologies. Using the Belgium electricity mix of 2011 as benchmark, the sodium sulfur battery is shown to be the best performer for all the impacts analyzed. Pumped hydro storage follows in second place. Regarding infrastructure and end of life, results indicate that battery systems

  2. Regulatory compliance for a Yucca Mountain Repository: A performance assessment perspective

    International Nuclear Information System (INIS)

    Dyer, J.R.; Van Luik, A.E.; Gil, A.V.; Brocoum, S.J.

    1997-01-01

    The U.S. Department of Energy's Yucca Mountain Site Characterization Project is scheduled to submit a License Application in the year 2002. The License Application is to show compliance with the regulations promulgated by the U.S. Nuclear Regulatory Commission which implement standards promulgated by the U.S. Environmental Protection Agency. These standards are being revised, and it is not certain what their exact nature will be in term of either the performance measure(s) or the time frames that are to be addressed. This paper provides some insights pertaining to this regulatory history, an update on Yucca Mountain performance assessments, and a Yucca Mountain Site Characterization Project perspective on proper standards based on Project experience in performance assessment for its proposed Yucca Mountain Repository system. The Project's performance assessment based perspective on a proper standard applicable to Yucca Mountain may be summarized as follows: a proper standard should be straight forward and understandable; should be consistent with other standards and regulations; and should require a degree of proof that is scientifically supportable in a licensing setting. A proper standard should have several attributes: (1) propose a reasonable risk level as its basis, whatever the quantitative performance measure is chosen to be, (2) state a definite regulatory time frame for showing compliance with quantitative requirements, (3) explicitly recognize that the compliance calculations are not predictions of actual future risks, (4) define the biosphere to which risk needs to be calculated in such a way as to constrain potentially endless speculation about future societies and future human actions, and (5) have as its only quantitative requirement the risk limit (or surrogate performance measure keyed to risk) for the total system

  3. A Process For Performance Evaluation Of Real-Time Systems

    Directory of Open Access Journals (Sweden)

    Andrew J. Kornecki

    2003-12-01

    Full Text Available Real-time developers and engineers must not only meet the system functional requirements, but also the stringent timing requirements. One of the critical decisions leading to meeting these timing requirements is the selection of an operating system under which the software will be developed and run. Although there is ample documentation on real-time systems performance and evaluation, little can be found that combines such information into an efficient process for use by developers. As the software industry moves towards clearly defined processes, creation of appropriate guidelines describing a process for performance evaluation of real-time system would greatly benefit real-time developers. This technology transition research focuses on developing such a process. PROPERT (PROcess for Performance Evaluation of Real Time systems - the process described in this paper - is based upon established techniques for evaluating real-time systems. It organizes already existing real-time performance criteria and assessment techniques in a manner consistent with a well-formed process, based on the Personal Software Process concepts.

  4. Some considerations for validation of repository performance assessment models

    International Nuclear Information System (INIS)

    Eisenberg, N.

    1991-01-01

    Validation is an important aspect of the regulatory uses of performance assessment. A substantial body of literature exists indicating the manner in which validation of models is usually pursued. Because performance models for a nuclear waste repository cannot be tested over the long time periods for which the model must make predictions, the usual avenue for model validation is precluded. Further impediments to model validation include a lack of fundamental scientific theory to describe important aspects of repository performance and an inability to easily deduce the complex, intricate structures characteristic of a natural system. A successful strategy for validation must attempt to resolve these difficulties in a direct fashion. Although some procedural aspects will be important, the main reliance of validation should be on scientific substance and logical rigor. The level of validation needed will be mandated, in part, by the uses to which these models are put, rather than by the ideal of validation of a scientific theory. Because of the importance of the validation of performance assessment models, the NRC staff has engaged in a program of research and international cooperation to seek progress in this important area. 2 figs., 16 refs

  5. Practical session assessments in human anatomy: Weightings and performance.

    Science.gov (United States)

    McDonald, Aaron C; Chan, Siew-Pang; Schuijers, Johannes A

    2016-07-08

    Assessment weighting within a given module can be a motivating factor for students when deciding on their commitment level and time given to study a specific topic. In this study, an analysis of assessment performances of second year anatomy students was performed over four years to determine if (1) students performed better when a higher weighting was given to a set of practical session assessments and (2) whether an improved performance in the practical session assessments had a carry-over effect on other assessment tasks within that anatomy module and/or other anatomy modules that follow. Results showed that increasing the weighting of practical session assessments improved the average mark in that assessment and also improved the percentage of students passing that assessment. Further, it significantly improved performance in the written end-semester examination within the same module and had a carry-over effect on the anatomy module taught in the next teaching period, as students performed better in subsequent practical session assessments as well as subsequent end-semester examinations. It was concluded that the weighting of assessments had significant influences on a student's performance in that, and subsequent, assessments. It is postulated that practical session assessments, designed to develop deep learning skills in anatomy, improved efficacy in student performance in assessments undertaken in that and subsequent anatomy modules when the weighting of these assessments was greater. These deep learning skills were also transferable to other methods of assessing anatomy. Anat Sci Educ 9: 330-336. © 2015 American Association of Anatomists. © 2015 American Association of Anatomists.

  6. French radioactive wastes performance assessment and the natural analogues approach: an overview

    International Nuclear Information System (INIS)

    Escalier des Orres, P.

    1988-10-01

    One of the main difficulties linked to the Radioactive Waste Performance Assessment calculations lies in the scale of time and space underlying these calculations: mechanisms and parameters can directly be affected by time or space dependency. The ''natural analogues'' approach has evident advantages, at least qualitative, to enlighten these aspects. It may also provide confidence in our ability to model partial or overall natural systems. The following paper gives the headlines of the use of the ''natural analogues'' methodology in the French Radioactive Wastes Performance Assessment in the field of waste disposal

  7. Environmental performance of advanced hybrid energy storage systems for electric vehicle applications

    International Nuclear Information System (INIS)

    Sanfélix, Javier; Messagie, Maarten; Omar, Noshin; Van Mierlo, Joeri; Hennige, Volker

    2015-01-01

    Highlights: • The environmental impact of advanced energy storage systems is assessed. • The methodology used is Life Cycle Assessment following the ISO 14040 and 14044. • Twelve impact categories are assessed to avoid burden shifting. • Increasing the efficiency and extending the lifetime benefits the environmental performance. • The results show that there are hot spots where to act and reduce the overall impact. - Abstract: In this paper the environmental performance of an advanced hybrid energy storage system, comprising high power and high energy lithium iron phosphate cells, is compared with a stand alone battery concept composed of lithium manganese oxide cells. The methodology used to analyse the environmental impacts is Life Cycle Assessment (LCA). The manufacturing, use phase and end-of-life of the battery packs are assessed for twelve impact categories. The functional unit is 1 km driven under European average conditions. The present study assesses the environmental performance of the two battery packs for two scenarios: scenario 1 with a vehicle total drive range of 150,000 km and scenario 2 with total driving range of the car of 300,000 km. The results of scenario 1 show that the increased efficiency of the hybrid system reduces, in general, the environmental impact during the use stage, although the manufacturing stage has higher impact than the benchmark. Scenario 2 shows how the extended lifetime of the hybrid system benefits the emissions per km driven

  8. Early-1990 status of performance assessment for the Waste Isolation Pilot Plant disposal system

    International Nuclear Information System (INIS)

    Bertram-Howery, S.G.; Swift, P.N.

    1991-07-01

    This paper summarizes the early-1990 status of the performance-assessment work being done to evaluate compliance of the Waste Isolation Pilot Plant with the U.S. Environmental Protection Agency regulation 40 CFR Part 191, Subpart B. This regulation sets environmental standards for radioactive waste disposal (Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes). As required by Subpart B, evaluations of compliance will include probabilistic numerical simulations of repository performance and qualitative judgments. Compliance appears uncertain only in the event of human intrusion into the repository after decommissioning. Issues affecting compliance following intrusion include properties of the plugs used to seal the intruding borehole, permeability and porosity of the waste, and possible pressurization of the repository by gas generated from the organic decomposition and corrosion of the waste and containers. Research is in progress to determine the probability of intrusion and to quantify parameter uncertainties needed to include these factors in simulations of repository performance. The Department of Energy (DOE) is following two strategies to assure compliance. First, passive marker systems will be designed and implemented to reduce the likelihood of intrusion and increase the likelihood that intruders will properly reseal the repository. Second, modifications to the form of the waste and the design of the repository to achieve acceptable performance if the intruding borehole is not adequately sealed will be designed. Goals include reductions in gas generation and waste permeability and porosity. Numerous modifications are technically possible. Work in progress will evaluate proposed modifications and recommend the most promising for further testing. The DOE is confident that compliance with Subpart B of 40 CFR 191 can be established using a combination of the two strategies

  9. Early-1990 status of performance assessment for the Waste Isolation Pilot Plant disposal system

    Energy Technology Data Exchange (ETDEWEB)

    Bertram-Howery, S G [Sandia National Laboratories, Albuquerque, NM (United States); Swift, P N [Tech Reps Inc., Albuquerque, NM (United States)

    1991-07-15

    This paper summarizes the early-1990 status of the performance-assessment work being done to evaluate compliance of the Waste Isolation Pilot Plant with the U.S. Environmental Protection Agency regulation 40 CFR Part 191, Subpart B. This regulation sets environmental standards for radioactive waste disposal (Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level and Transuranic Radioactive Wastes). As required by Subpart B, evaluations of compliance will include probabilistic numerical simulations of repository performance and qualitative judgments. Compliance appears uncertain only in the event of human intrusion into the repository after decommissioning. Issues affecting compliance following intrusion include properties of the plugs used to seal the intruding borehole, permeability and porosity of the waste, and possible pressurization of the repository by gas generated from the organic decomposition and corrosion of the waste and containers. Research is in progress to determine the probability of intrusion and to quantify parameter uncertainties needed to include these factors in simulations of repository performance. The Department of Energy (DOE) is following two strategies to assure compliance. First, passive marker systems will be designed and implemented to reduce the likelihood of intrusion and increase the likelihood that intruders will properly reseal the repository. Second, modifications to the form of the waste and the design of the repository to achieve acceptable performance if the intruding borehole is not adequately sealed will be designed. Goals include reductions in gas generation and waste permeability and porosity. Numerous modifications are technically possible. Work in progress will evaluate proposed modifications and recommend the most promising for further testing. The DOE is confident that compliance with Subpart B of 40 CFR 191 can be established using a combination of the two strategies

  10. Active solar heating system performance and data review

    Energy Technology Data Exchange (ETDEWEB)

    Bates, J.; Bertarelli, L.; Schmidt, G.

    1999-07-01

    This report summarises the results of a study investigating the performance and costs of solar heating systems in Europe, and their relevance to systems in the UK. Details are given of the identification and review of the available data, the collection of information on UK and overseas systems, and the assessment and analysis of the data. Appendices give a lists of the monitored parameters, European contacts, data sources, the questionnaire for gathering information, and a printout of the data files. (uk)

  11. Performance Assessments: A Review of Definitions, Quality Characteristics, and Outcomes Associated with Their Use in K-12 Schools

    Science.gov (United States)

    Bland, Lynne M.; Gareis, Christopher R.

    2018-01-01

    After nearly two decades of federal and state accountability requirements relying on conventional standardized assessments, Virginia and several other states are moving to create more balanced approaches to statewide assessment systems that include the use of performance assessments. But Palm (2008) states, "Performance assessment can mean…

  12. SKI SITE-94. Deep Repository Performance Assessment Project Volume I and II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The function of SITE-94 is to provide the Swedish Nuclear Power Inspectorate (SKI) with the capacity and supporting knowledge needed for reviewing the Swedish nuclear industry`s R and D programs and for reviewing license applications, as stipulated in Swedish legislation. The report is structured as a Performance Assessment exercise needed for input to decisions regarding repository safety, but the SITE-94 is not a safety assessment or a model for future assessments to be undertaken by the prospective licensee. The specific project objectives of SITE-94 comprise site evaluation, performance assessment methodology, canister integrity and radionuclide release and transport calculations. The report gives a detailed description of the many inter-related studies undertaken as part of the research project. As a general conclusion it is noted that the SITE-94 project has significantly advanced SKI`s capability of reviewing performance assessments and has led to the development of a tool-kit for carrying out assessment calculations, both in terms of numerical and scoping analyses. The study has highlighted a number of key issues for safety assessment (and consequently for disposal system design): Canister performance; Derived parameters of geosphere retention properties; Spatial variability of groundwater flow and geochemistry of migration paths; Time dependency (more emphasis on transient, time-dependent processes); Buffer evolution over long time. 488 refs.

  13. SKI SITE-94. Deep Repository Performance Assessment Project Volume I and II

    International Nuclear Information System (INIS)

    1996-12-01

    The function of SITE-94 is to provide the Swedish Nuclear Power Inspectorate (SKI) with the capacity and supporting knowledge needed for reviewing the Swedish nuclear industry's R and D programs and for reviewing license applications, as stipulated in Swedish legislation. The report is structured as a Performance Assessment exercise needed for input to decisions regarding repository safety, but the SITE-94 is not a safety assessment or a model for future assessments to be undertaken by the prospective licensee. The specific project objectives of SITE-94 comprise site evaluation, performance assessment methodology, canister integrity and radionuclide release and transport calculations. The report gives a detailed description of the many inter-related studies undertaken as part of the research project. As a general conclusion it is noted that the SITE-94 project has significantly advanced SKI's capability of reviewing performance assessments and has led to the development of a tool-kit for carrying out assessment calculations, both in terms of numerical and scoping analyses. The study has highlighted a number of key issues for safety assessment (and consequently for disposal system design): Canister performance; Derived parameters of geosphere retention properties; Spatial variability of groundwater flow and geochemistry of migration paths; Time dependency (more emphasis on transient, time-dependent processes); Buffer evolution over long time. 488 refs

  14. Method to assess the performance of domestic ventilation systems considering the influence of uncertainties

    NARCIS (Netherlands)

    Yang, Z.

    2012-01-01

    The ventilation system plays an important role in the indoor environment of a domestic building. A ventilation system is normally designed based on the national or regional regulations. Although ventilation systems are designed based on the same design rules, performance deviations between different

  15. Improving Steam System Performance: A Sourcebook for Industry

    Energy Technology Data Exchange (ETDEWEB)

    2002-06-01

    The sourcebook is a reference for industrial steam system users, outlining opportunities to improve steam system performance. This Sourcebook is designed to provide steam system users with a reference that describes the basic steam system components, outlines opportunities for energy and performance improvements, and discusses the benefits of a systems approach in identifying and implementing these improvement opportunities. The Sourcebook is divided into the following three main sections: Section 1: Steam System Basics--For users unfamiliar with the basics of steam systems, or for users seeking a refresher, a brief discussion of the terms, relationships, and important system design considerations is provided. Users already familiar with industrial steam system operation may want to skip this section. This section describes steam systems using four basic parts: generation, distribution, end use, and recovery. Section 2: Performance Improvement Opportunities--This section discusses important factors that should be considered when industrial facilities seek to improve steam system performance and to lower operating costs. This section also provides an overview of the finance considerations related to steam system improvements. Additionally, this section discusses several resources and tools developed by the U. S. Department of Energy's (DOE) BestPractices Steam Program to identify and assess steam system improvement opportunities. Section 3: Programs, Contacts, and Resources--This section provides a directory of associations and other organizations involved in the steam system marketplace. This section also provides a description of the BestPractices Steam Program, a directory of contacts, and a listing of available resources and tools, such as publications, software, training courses, and videos.

  16. A method for performance assessment of medical radioisotope equipment

    International Nuclear Information System (INIS)

    Kerin, T.; Slavtchev, Ath.; Nedeltchev, M.; Kjurktchiev, T.

    1984-01-01

    A variety of tests and procedures exist for the performance assessment of radioisotope diagnostic equipment. The complex performance index which has been introduced to date is based on an heuristic approach. The present work tries to interconnect algorithmically the most important factors as the influence of the measurement geometry, the statistic peculiarities for lower activities and the information loss at high count rates. All this is reflected in a criterion which integrates the spatial resolution, the effective detector's field of vision, the radionuclide's sensitivity, the background count rate and the effective dead-time of the system under investigation. (Auth.)

  17. Performance Status and Change--Measuring Education System Effectiveness with Data from PISA 2000-2009

    Science.gov (United States)

    Lenkeit, Jenny; Caro, Daniel H.

    2014-01-01

    Reports of international large-scale assessments tend to evaluate and compare education system performance based on absolute scores. And policymakers refer to high-performing and economically prosperous education systems to enhance their own systemic features. But socioeconomic differences between systems compromise the plausibility of those…

  18. Enabling performance skills: Assessment in engineering education

    Science.gov (United States)

    Ferrone, Jenny Kristina

    Current reform in engineering education is part of a national trend emphasizing student learning as well as accountability in instruction. Assessing student performance to demonstrate accountability has become a necessity in academia. In newly adopted criterion proposed by the Accreditation Board for Engineering and Technology (ABET), undergraduates are expected to demonstrate proficiency in outcomes considered essential for graduating engineers. The case study was designed as a formative evaluation of freshman engineering students to assess the perceived effectiveness of performance skills in a design laboratory environment. The mixed methodology used both quantitative and qualitative approaches to assess students' performance skills and congruency among the respondents, based on individual, team, and faculty perceptions of team effectiveness in three ABET areas: Communications Skills. Design Skills, and Teamwork. The findings of the research were used to address future use of the assessment tool and process. The results of the study found statistically significant differences in perceptions of Teamwork Skills (p performance skills, such as teamwork, among freshman engineering students; (2) incorporate feedback into the learning process; (3) strengthen the assessment process with a follow-up plan that specifically targets performance skill deficiencies, and (4) integrate the assessment instrument and practice with ongoing curriculum development. The findings generated by this study provides engineering departments engaged in assessment activity, opportunity to reflect, refine, and develop their programs as it continues. It also extends research on ABET competencies of engineering students in an under-investigated topic of factors correlated with team processes, behavior, and student learning.

  19. Conceptual frameworks for health systems performance: a quest for effectiveness, quality, and improvement.

    NARCIS (Netherlands)

    Arah, O.A.; Klazinga, N.S.; Delnoij, D.M.J.; Asbroek, A.H.A. ten; Custers, T.

    2003-01-01

    ISSUES: Countries and international organizations have recently renewed their interest in how health systems perform. This has led to the development of performance indicators for monitoring, assessing, and managing health systems to achieve effectiveness, equity, efficiency, and quality. Although

  20. Conceptual frameworks for health systems performance: a quest for effectiveness, quality, and improvement

    NARCIS (Netherlands)

    Arah, O. A.; Klazinga, N. S.; Delnoij, D. M. J.; ten Asbroek, A. H. A.; Custers, T.

    2003-01-01

    Issues. Countries and international organizations have recently renewed their interest in how health systems perform. This has led to the development of performance indicators for monitoring, assessing, and managing health systems to achieve effectiveness, equity, efficiency, and quality. Although

  1. Power plant system assessment. Final report. SP-100 Program

    International Nuclear Information System (INIS)

    Anderson, R.V.; Atkins, D.F.; Bost, D.S.

    1983-01-01

    The purpose of this assessment was to provide system-level insights into 100-kWe-class space reactor electric systems. Using these insights, Rockwell was to select and perform conceptual design studies on a ''most attractive'' system that met the preliminary design goals and requirements of the SP-100 Program. About 4 of the 6 months were used in the selection process. The remaining 2 months were used for the system conceptual design studies. Rockwell completed these studies at the end of FY 1983. This report summarizes the results of the power plant system assessment and describes our choice for the most attractive system - the Rockwell SR-100G System (Space Reactor, 100 kWe, Growth) - a lithium-cooled UN-fueled fast reactor/Brayton turboelectric converter system

  2. TSPA 1991: An initial total-system performance assessment for Yucca Mountain; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Barnard, R.W.; Wilson, M.L.; Dockery, H.A.; Kaplan, P.G.; Eaton, R.R.; Bingham, F.W. [Sandia National Labs., Albuquerque, NM (United States); Gauthier, J.H.; Robey, T.H. [Spectra Research Inst., Albuquerque, NM (United States)

    1992-07-01

    This report describes an assessment of the long-term performance of a repository system that contains deeply buried highly radioactive waste; the system is assumed to be located at the potential site at Yucca Mountain, Nevada. The study includes an identification of features, events, and processes that might affect the potential repository, a construction of scenarios based on this identification, a selection of models describing these scenarios (including abstraction of appropriate models from detailed models), a selection of probability distributions for the parameters in the models, a stochastic calculation of radionuclide releases for the scenarios, and a derivation of complementary cumulative distribution functions (CCDFs) for the releases. Releases and CCDFs are calculated for four categories of scenarios: aqueous flow (modeling primarily the existing conditions at the site, with allowances for climate change), gaseous flow, basaltic igneous activity, and human intrusion. The study shows that models of complex processes can be abstracted into more simplified representations that preserve the understanding of the processes and produce results consistent with those of more complex models.

  3. Assessing Vocal Performances Using Analytical Assessment: A Case Study

    Science.gov (United States)

    Gynnild, Vidar

    2016-01-01

    This study investigated ways to improve the appraisal of vocal performances within a national academy of music. Since a criterion-based assessment framework had already been adopted, the conceptual foundation of an assessment rubric was used as a guide in an action research project. The group of teachers involved wanted to explore thinking…

  4. Assessment of the performance of containment and surveillance equipment part 1: methodology

    International Nuclear Information System (INIS)

    Rezniczek, A.; Richter, B.

    2009-01-01

    Equipment performance aims at the creation of relevant data. As Containment and Surveillance (C/S) is playing an ever increasing role in safeguards systems, the issue of how to assess the performance of C/S equipment is being addressed by the ESARDA Working Group on C/S. The issue is important not only for the development of appropriate safeguards approaches but also for the review of existing approaches with regard to the implementation of the Additional Protocol (A P) and Integrated Safeguards. It is expected that the selection process of appropriate equipment, especially for unattended operation, is facilitated by the availability of methods to determine the performance of such equipment. Apart from EURATOM, the users of assessment methodologies would be the International Atomic Energy Agency (IAEA), plant operators, and instrument developers. The paper describes a non-quantitative performance assessment methodology. A structured procedure is outlined that allows assessing the suitability of different C/S instrumentation to comply with the objectives of its application. The principle to determine the performance of C/S equipment is to define, based on safeguards requirements, a task profile and to check the performance profile against the task profile. The performance profile of C/S equipment can be derived from the functional specifications and design basis tolerances provided by the equipment manufacturers.

  5. Thermal insulation performance of green roof systems

    Energy Technology Data Exchange (ETDEWEB)

    Celik, Serdar; Morgan, Susan; Retzlaff, William; Once, Orcun [southern Illinois University (United States)], e-mail: scelik@siue.edu, e-mail: smorgan@siue.edu, e-mail: wretzla@siue.edu, e-mail: oonce@siue.edu

    2011-07-01

    With the increasing costs of energy, good building insulation has become increasingly important. Among existing insulation techniques is the green roof system, which consists of covering the roof of a building envelop with plants. The aim of this paper is to assess the impact of vegetation type and growth media on the thermal performance of green roof systems. Twelve different green roof samples were made with 4 different growth media and 3 sedum types. Temperature at the sample base was recorded every 15 minutes for 3 years; the insulation behavior was then analysed. Results showed that the insulation characteristics were achieved with a combination of haydite and sedum sexangulare. This study demonstrated that the choice of growth media and vegetation is important to the green roof system's performance; further research is required to better understand the interactions between growth media and plant roots.

  6. Performance Assessment as a Diagnostic Tool for Science Teachers

    Science.gov (United States)

    Kruit, Patricia; Oostdam, Ron; van den Berg, Ed; Schuitema, Jaap

    2018-04-01

    Information on students' development of science skills is essential for teachers to evaluate and improve their own education, as well as to provide adequate support and feedback to the learning process of individual students. The present study explores and discusses the use of performance assessments as a diagnostic tool for formative assessment to inform teachers and guide instruction of science skills in primary education. Three performance assessments were administered to more than 400 students in grades 5 and 6 of primary education. Students performed small experiments using real materials while following the different steps of the empirical cycle. The mutual relationship between the three performance assessments is examined to provide evidence for the value of performance assessments as useful tools for formative evaluation. Differences in response patterns are discussed, and the diagnostic value of performance assessments is illustrated with examples of individual student performances. Findings show that the performance assessments were difficult for grades 5 and 6 students but that much individual variation exists regarding the different steps of the empirical cycle. Evaluation of scores as well as a more substantive analysis of students' responses provided insight into typical errors that students make. It is concluded that performance assessments can be used as a diagnostic tool for monitoring students' skill performance as well as to support teachers in evaluating and improving their science lessons.

  7. Procedure for the assessment of material control and accounting systems

    International Nuclear Information System (INIS)

    Maimoni, A.; Sacks, I.; Cleland, L.

    1978-01-01

    The current status of the LLL program for MC and A system assessment is reviewed. Particular emphasis is given to the assessment procedure and results. The integrated approach we have taken includes many of the functions normally assigned to physical security. Deceit and tampering are explicitly considered. The results of such a detailed assessment include a systematic identification of adversary targets; the most vulnerable portions of the safeguards system; the number and type of adversaries required, in collusion, to fail the system; and the conditional probabilities of safeguard system failure for a variety of assumptions. The assessment procedure was demonstrated by analyzing a prototype fuel cycle facility, the Test Bed. We believe our methodology will be useful to the NRC as a means of performing detailed, objective assessments. The nuclear industry also should find it valuable as a design tool

  8. VISUAL ART TEACHERS AND PERFORMANCE ASSESSMENT ...

    African Journals Online (AJOL)

    Charles

    qualitative research design; an aspect of descriptive survey research aiming at ... the competence and use of assessment strategies is determined by the type of ... Visual Art Teachers and Performance Assessment Methods in Nigerian Senior ...

  9. Assessing the performance and benefits of customer distributed generation developers under uncertainties

    International Nuclear Information System (INIS)

    Zangiabadi, Mansoureh; Feuillet, Rene; Lesani, Hamid; Hadj-Said, Nouredine; Kvaloy, Jan T.

    2011-01-01

    In this paper, the performance of customer-owned distributed generation (DG) units is quantified from different perspectives through an uncertainty study. A Monte Carlo-based method is applied to assess the stochastic operation of the customer-owned DG units in the power distribution system. Several cases are studied to analyze the impact on system performance of using such generators, with the emphasis on benefits. The results of the studied cases show that proper operation of customer-owned DG units placed close to significant consumption centers offers several benefits which lead to significant energy savings and improvement in the performance indices while maintaining the cost-effectiveness. Furthermore, based on the energy demand, different electricity price scenarios considering a cost sensitivity analysis are performed to indicate how the variations in electricity price influence each scenario's feasibility. It is concluded that implementation of a proper energy purchase policy, and allocating the benefits of DG units to the owners, improves the economic performance of their investments and encourages customer DG developers to connect DG to the distribution network. -- Research highlights: → Focusing on the main drives for customers and utilities to adopt DG solutions. → Assessing the stochastic operation of the customer-owned DG units in the power distribution system using Monte Carlo method. → Studying the technical and economic impacts of customer-owned DG units in a distribution system. → Implementing the proper power purchase policy by the utility to encourage DG owners to operate at peak load periods. → Performing different electricity price scenarios to indicate the ability of customer-owned DG units to reduce the volatility in prices.

  10. Assessing the performance of the Nagra HLW disposal concept

    International Nuclear Information System (INIS)

    Smith, P.; Zuidema, P.; McKinley, I.G.

    1995-01-01

    This article outlines the procedures used in safety assessment and illustrates their application in evaluating the performance of a high-level waste repository. Nagra's general safety assessment methodology has five main components: formulating the aims of the analysis, defining the safety concept, scenario development, consequence analysis and interpretation of results. A safety analysis based on conservative assumptions shows that the engineered barriers of the high-level waste repository are very effective in preventing release of radionuclides; this alone is sufficient to ensure that regulatory requirements can be met. The function of the host rock is to provide a favourable environment for the engineered barrier system. (author) 8 figs

  11. Selection of a computer code for Hanford low-level waste engineered-system performance assessment. Revision 1

    International Nuclear Information System (INIS)

    McGrail, B.P.; Bacon, D.H.

    1998-02-01

    Planned performance assessments for the proposed disposal of low-activity waste (LAW) glass produced from remediation of wastes stored in underground tanks at Hanford, Washington will require calculations of radionuclide release rates from the subsurface disposal facility. These calculations will be done with the aid of computer codes. The available computer codes with suitable capabilities at the time Revision 0 of this document was prepared were ranked in terms of the feature sets implemented in the code that match a set of physical, chemical, numerical, and functional capabilities needed to assess release rates from the engineered system. The needed capabilities were identified from an analysis of the important physical and chemical processes expected to affect LAW glass corrosion and the mobility of radionuclides. This analysis was repeated in this report but updated to include additional processes that have been found to be important since Revision 0 was issued and to include additional codes that have been released. The highest ranked computer code was found to be the STORM code developed at PNNL for the US Department of Energy for evaluation of arid land disposal sites

  12. Performance Assessment Method for a Forged Fingerprint Detection Algorithm

    Science.gov (United States)

    Shin, Yong Nyuo; Jun, In-Kyung; Kim, Hyun; Shin, Woochang

    The threat of invasion of privacy and of the illegal appropriation of information both increase with the expansion of the biometrics service environment to open systems. However, while certificates or smart cards can easily be cancelled and reissued if found to be missing, there is no way to recover the unique biometric information of an individual following a security breach. With the recognition that this threat factor may disrupt the large-scale civil service operations approaching implementation, such as electronic ID cards and e-Government systems, many agencies and vendors around the world continue to develop forged fingerprint detection technology, but no objective performance assessment method has, to date, been reported. Therefore, in this paper, we propose a methodology designed to evaluate the objective performance of the forged fingerprint detection technology that is currently attracting a great deal of attention.

  13. Health system performance at the district level in Indonesia after decentralization

    Directory of Open Access Journals (Sweden)

    Choi Yoonjoung

    2010-03-01

    Full Text Available Abstract Background Assessments over the last two decades have showed an overall low level of performance of the health system in Indonesia with wide variation between districts. The reasons advanced for these low levels of performance include the low level of public funding for health and the lack of discretion for health system managers at the district level. When, in 2001, Indonesia implemented a radical decentralization and significantly increased the central transfer of funds to district governments it was widely expected that the performance of the health system would improve. This paper assesses the extent to which the performance of the health system has improved since decentralization. Methods We measured a set of indicators relevant to assessing changes in performance of the health system between two surveys in three areas: utilization of maternal antenatal and delivery care; immunization coverage; and contraceptive source and use. We also measured respondents' demographic characteristics and their living circumstances. These measurements were made in population-based surveys in 10 districts in 2002-03 and repeated in 2007 in the same 10 districts using the same instruments and sampling methods. Results The dominant providers of maternal and child health in these 10 districts are in the private sector. There was a significant decrease in birth deliveries at home, and a corresponding increase in deliveries in health facilities in 5 of the 10 districts, largely due to increased use of private facilities with little change in the already low use of public facilities. Overall, there was no improvement in vaccination of mothers and their children. Of those using modern contraceptive methods, the majority obtained them from the private sector in all districts. Conclusions There has been little improvement in the performance of the health system since decentralization occurred in 2001 even though there have also been significant increases in

  14. Development of Flight-Test Performance Estimation Techniques for Small Unmanned Aerial Systems

    Science.gov (United States)

    McCrink, Matthew Henry

    This dissertation provides a flight-testing framework for assessing the performance of fixed-wing, small-scale unmanned aerial systems (sUAS) by leveraging sub-system models of components unique to these vehicles. The development of the sub-system models, and their links to broader impacts on sUAS performance, is the key contribution of this work. The sub-system modeling and analysis focuses on the vehicle's propulsion, navigation and guidance, and airframe components. Quantification of the uncertainty in the vehicle's power available and control states is essential for assessing the validity of both the methods and results obtained from flight-tests. Therefore, detailed propulsion and navigation system analyses are presented to validate the flight testing methodology. Propulsion system analysis required the development of an analytic model of the propeller in order to predict the power available over a range of flight conditions. The model is based on the blade element momentum (BEM) method. Additional corrections are added to the basic model in order to capture the Reynolds-dependent scale effects unique to sUAS. The model was experimentally validated using a ground based testing apparatus. The BEM predictions and experimental analysis allow for a parameterized model relating the electrical power, measurable during flight, to the power available required for vehicle performance analysis. Navigation system details are presented with a specific focus on the sensors used for state estimation, and the resulting uncertainty in vehicle state. Uncertainty quantification is provided by detailed calibration techniques validated using quasi-static and hardware-in-the-loop (HIL) ground based testing. The HIL methods introduced use a soft real-time flight simulator to provide inertial quality data for assessing overall system performance. Using this tool, the uncertainty in vehicle state estimation based on a range of sensors, and vehicle operational environments is

  15. Evaluation of the performance of the OneTouch Select Plus blood glucose test system against ISO 15197:2013.

    Science.gov (United States)

    Setford, Steven; Smith, Antony; McColl, David; Grady, Mike; Koria, Krisna; Cameron, Hilary

    2015-01-01

    Assess laboratory and in-clinic performance of the OneTouch Select(®) Plus test system against ISO 15197:2013 standard for measurement of blood glucose. System performance assessed in laboratory against key patient, environmental and pharmacologic factors. User performance was assessed in clinic by system-naïve lay-users. Healthcare professionals assessed system accuracy on diabetes subjects in clinic. The system demonstrated high levels of performance, meeting ISO 15197:2013 requirements in laboratory testing (precision, linearity, hematocrit, temperature, humidity and altitude). System performance was tested against 28 interferents, with an adverse interfering effect only being recorded for pralidoxime iodide. Clinic user performance results fulfilled ISO 15197:2013 accuracy criteria. Subjects agreed that the color range indicator clearly showed if they were low, in-range or high and helped them better understand glucose results. The system evaluated is accurate and meets all ISO 15197:2013 requirements as per the tests described. The color range indicator helped subjects understand glucose results and supports patients in following healthcare professional recommendations on glucose targets.

  16. Assessing the performance of renewable electricity support instruments

    International Nuclear Information System (INIS)

    Verbruggen, Aviel; Lauber, Volkmar

    2012-01-01

    The performance of feed-in tariffs and tradable certificates is assessed on criteria of efficacy, efficiency, equity and institutional feasibility. In the early stage of transition to an energy system based entirely on renewable energy supplies, renewable electricity can only thrive if support takes into account the specific technical, economic and political problems which result from embedding this electricity in conventional power systems whose technology, organizational structure, environmental responsibility and general mission differ profoundly from the emerging, renewable-based system. Support schemes need to capture the diversity of power supplies, the variable nature of some renewable supplies, and their different attributes for the purposes of public policy. They must take into account the variety of generators – including small, decentralized generation – emerging in a renewable-based system, and the new relationships between generators and customers. Renewable energy policies need a clear point of reference: because the incumbent power systems are not sustainable they must adapt to the requirements of the renewable ones, not the other way round. Incumbent systems carry the responsibility of paying the transition, something that corresponds best with the polluter pays principle. - Highlights: ► Present power systems must adapt to the requirements of growing renewable ones, not the opposite. ► Well performing support systems capture the diversity of renewable sources and technologies. ► Feed-in Tariffs are superior in addressing the renewables' diversity and in promoting innovation. ► Feed-in Tariffs put transition burdens on incumbents and stimulate independent producers.

  17. The Physics of transmutation systems : system capabilities and performances

    International Nuclear Information System (INIS)

    Finck, P. J.

    2002-01-01

    This document is complementary to a document produced by Prof. Salvatores on ''The Physics of Transmutation in Critical or Subcritical Reactors and the Impact on the Fuel Cycle''. In that document, Salvatores describes the fundamental of transmutation, through basic physics properties and general parametric studies. In the present document we try to go one step further towards practical implementation (while recognizing that the practical issues such as technology development and demonstration, and economics, can only be mentioned in a very superficial manner). Section 1 briefly overviews the possible objectives of transmutation systems, and links these different objectives to possible technological paths. It also describes the overall constraints which have to be considered when developing and implementing transmutation systems. In section 2 we briefly overview the technological constraints which need to be accounted for when designing transmutation systems. In section 3 we attempt to provide a simplified classification of transmutation systems in order to clarify later comparisons. It compares heterogeneous and homogeneous recycle strategies, and single and multi-tier systems. Section 4 presents case analyses for assessing the transmutation performance of various individual systems, starting with LWR's ((1) generic results; (2) multirecycle of plutonium; (3) an alternative: transmutation based on a Thorium fuel cycle), followed by Gas-Cooled Reactors (with an emphasis on the ''deep burn'' approach), and followed by Fast Reactors and Accelerator Driven systems ((1) generic results; (2) homogeneous recycle of transuranics; (3) practical limit between Fast Reactors and Accelerator Driven Systems) Section 5 summarizes recent results on integrated system performances. It focuses first on interface effects between the two elements of a dual tier system, and then summarizes the major lessons learned from recent global physics studies

  18. Performance Assessment of a Post-Closure Pyrophoric Event

    International Nuclear Information System (INIS)

    Duguid, James; Senger, R.; Leem, J.

    2001-01-01

    The U.S. Department of Energy (DOE) spent nuclear fuel (DSNF) is categorized into eleven different spent fuel groups. Group 7, is predominantly uranium metal spent fuel from N Reactor that could oxidize rapidly in the presence of air when a waste package is breached. Such rapid oxidation constitutes a pyrophoric event. The consequences of a post closure pyrophoric event were evaluated in terms of its potential to damage adjacent waste packages and consequences of it in terms of long-term dose to humans. This work was conducted as part of the total system performance assessment (TSPA) of DOE spent fuel for the National Spent Nuclear Fuel Program. These analyses were performed in support of the site recommendation for a repository at Yucca Mountain, Nevada

  19. Performance success from self-assessments

    International Nuclear Information System (INIS)

    Hughes, G.

    1996-01-01

    This paper provides information on and successes of self-assessments completed at the Callaway plant. It stresses the vital needs and substantial benefits from these continual self-improvement efforts. The Callaway plant staff use a variety of methods and techniques to do self-assessments with the focus on performance outcomes. Self-assessments help Callaway focus on the priority issues and direct resources properly. Callaway's success has been due to this learning culture. The Callaway plant is a Westinghouse four-loop plant in the state of Missouri and has been operational since 1984

  20. ASSESSMENT OF WATER PUMPING SYSTEM AND IMPROVEMENT IN HYDRO-ENERGETIC PERFORMANCE

    Directory of Open Access Journals (Sweden)

    Augusto da Gama Rego

    2017-01-01

    Full Text Available Within the policy of sanitation services for all and the need t o lower electricity consumption, the current analysis evaluates the water pumping s ystem and defines actions for the improvement of hydro-energetic performance. The present research was divided into two sections: assessment of the water pumping syst em (based on hydro- energetic simulation and an analysis of the impact of ineffici ency on electric energy consumption (based on computer simulation. Results revealed th at methodology was satisfactory and that the main operational issues could be iden tified and corrections could be computer-simulated. A potential 16% reduction in consu mption and in electricity costs could be obtained.

  1. A new methodology for assessment of the performance of heartbeat classification systems

    Directory of Open Access Journals (Sweden)

    Hool Livia C

    2008-01-01

    Full Text Available Abstract Background The literature presents many different algorithms for classifying heartbeats from ECG signals. The performance of the classifier is normally presented in terms of sensitivity, specificity or other metrics describing the proportion of correct versus incorrect beat classifications. From the clinician's point of view, such metrics are however insufficient to rate the performance of a classifier. Methods We propose a new methodology for the presentation of classifier performance, based on Bayesian classification theory. Our proposition lets the investigators report their findings in terms of beat-by-beat comparisons, and defers the role of assessing the utility of the classifier to the statistician. Evaluation of the classifier's utility must be undertaken in conjunction with the set of relative costs applicable to the clinicians' application. Such evaluation produces a metric more tuned to the specific application, whilst preserving the information in the results. Results By way of demonstration, we propose a set of costs, based on clinical data from the literature, and examine the results of two published classifiers using our method. We make recommendations for reporting classifier performance, such that this method can be used for subsequent evaluation. Conclusion The proportion of misclassified beats contains insufficient information to fully evaluate a classifier. Performance reports should include a table of beat-by-beat comparisons, showing not-only the number of misclassifications, but also the identity of the classes involved in each inaccurate classification.

  2. Quantitative safety assessment of air traffic control systems through system control capacity

    Science.gov (United States)

    Guo, Jingjing

    Quantitative Safety Assessments (QSA) are essential to safety benefit verification and regulations of developmental changes in safety critical systems like the Air Traffic Control (ATC) systems. Effectiveness of the assessments is particularly desirable today in the safe implementations of revolutionary ATC overhauls like NextGen and SESAR. QSA of ATC systems are however challenged by system complexity and lack of accident data. Extending from the idea "safety is a control problem" in the literature, this research proposes to assess system safety from the control perspective, through quantifying a system's "control capacity". A system's safety performance correlates to this "control capacity" in the control of "safety critical processes". To examine this idea in QSA of the ATC systems, a Control-capacity Based Safety Assessment Framework (CBSAF) is developed which includes two control capacity metrics and a procedural method. The two metrics are Probabilistic System Control-capacity (PSC) and Temporal System Control-capacity (TSC); each addresses an aspect of a system's control capacity. And the procedural method consists three general stages: I) identification of safety critical processes, II) development of system control models and III) evaluation of system control capacity. The CBSAF was tested in two case studies. The first one assesses an en-route collision avoidance scenario and compares three hypothetical configurations. The CBSAF was able to capture the uncoordinated behavior between two means of control, as was observed in a historic midair collision accident. The second case study compares CBSAF with an existing risk based QSA method in assessing the safety benefits of introducing a runway incursion alert system. Similar conclusions are reached between the two methods, while the CBSAF has the advantage of simplicity and provides a new control-based perspective and interpretation to the assessments. The case studies are intended to investigate the

  3. Source-term model for the SYVAC3-NSURE performance assessment code

    International Nuclear Information System (INIS)

    Rowat, J.H.; Rattan, D.S.; Dolinar, G.M.

    1996-11-01

    Radionuclide contaminants in wastes emplaced in disposal facilities will not remain in those facilities indefinitely. Engineered barriers will eventually degrade, allowing radioactivity to escape from the vault. The radionuclide release rate from a low-level radioactive waste (LLRW) disposal facility, the source term, is a key component in the performance assessment of the disposal system. This report describes the source-term model that has been implemented in Ver. 1.03 of the SYVAC3-NSURE (Systems Variability Analysis Code generation 3-Near Surface Repository) code. NSURE is a performance assessment code that evaluates the impact of near-surface disposal of LLRW through the groundwater pathway. The source-term model described here was developed for the Intrusion Resistant Underground Structure (IRUS) disposal facility, which is a vault that is to be located in the unsaturated overburden at AECL's Chalk River Laboratories. The processes included in the vault model are roof and waste package performance, and diffusion, advection and sorption of radionuclides in the vault backfill. The model presented here was developed for the IRUS vault; however, it is applicable to other near-surface disposal facilities. (author). 40 refs., 6 figs

  4. Aging assessment for active fire protection systems

    International Nuclear Information System (INIS)

    Ross, S.B.; Nowlen, S.P.; Tanaka, T.

    1995-06-01

    This study assessed the impact of aging on the performance and reliability of active fire protection systems including both fixed fire suppression and fixed fire detection systems. The experience base shows that most nuclear power plants have an aggressive maintenance and testing program and are finding degraded fire protection system components before a failure occurs. Also, from the data reviewed it is clear that the risk impact of fire protection system aging is low. However, it is assumed that a more aggressive maintenance and testing program involving preventive diagnostics may reduce the risk impact even further

  5. State of the art in video system performance

    Science.gov (United States)

    Lewis, Michael J.

    1990-01-01

    The closed circuit television (CCTV) system that is onboard the Space Shuttle has the following capabilities: camera, video signal switching and routing unit (VSU); and Space Shuttle video tape recorder. However, this system is inadequate for use with many experiments that require video imaging. In order to assess the state-of-the-art in video technology and data storage systems, a survey was conducted of the High Resolution, High Frame Rate Video Technology (HHVT) products. The performance of the state-of-the-art solid state cameras and image sensors, video recording systems, data transmission devices, and data storage systems versus users' requirements are shown graphically.

  6. Systemic Assessment as a New Tool for Assessing Students ...

    African Journals Online (AJOL)

    Systemic Assessment as a New Tool for Assessing Students Learning in Chemistry using SATL Methods: Systemic Matching, Systemic Synthesis, Systemic Analysis, Systemic Synthetic – Analytic, as Systemic Question Types.

  7. Diagnosis of regional evaporation by remote sensing to support irrigation performance assessment

    NARCIS (Netherlands)

    Bastiaanssen, W.G.M.; Wal, van der T.; Visser, T.N.M.

    1996-01-01

    Performance assessment indicators, being functions of evaporation, are useful tools to evaluate the actual functioning of an irrigation system. The spatial variability of evaporation in large irrigation schemes makes its determination with conventional point measurements almost impossible. A new

  8. Probabilistic Radiological Performance Assessment Modeling and Uncertainty

    Science.gov (United States)

    Tauxe, J.

    2004-12-01

    A generic probabilistic radiological Performance Assessment (PA) model is presented. The model, built using the GoldSim systems simulation software platform, concerns contaminant transport and dose estimation in support of decision making with uncertainty. Both the U.S. Nuclear Regulatory Commission (NRC) and the U.S. Department of Energy (DOE) require assessments of potential future risk to human receptors of disposal of LLW. Commercially operated LLW disposal facilities are licensed by the NRC (or agreement states), and the DOE operates such facilities for disposal of DOE-generated LLW. The type of PA model presented is probabilistic in nature, and hence reflects the current state of knowledge about the site by using probability distributions to capture what is expected (central tendency or average) and the uncertainty (e.g., standard deviation) associated with input parameters, and propagating through the model to arrive at output distributions that reflect expected performance and the overall uncertainty in the system. Estimates of contaminant release rates, concentrations in environmental media, and resulting doses to human receptors well into the future are made by running the model in Monte Carlo fashion, with each realization representing a possible combination of input parameter values. Statistical summaries of the results can be compared to regulatory performance objectives, and decision makers are better informed of the inherently uncertain aspects of the model which supports their decision-making. While this information may make some regulators uncomfortable, they must realize that uncertainties which were hidden in a deterministic analysis are revealed in a probabilistic analysis, and the chance of making a correct decision is now known rather than hoped for. The model includes many typical features and processes that would be part of a PA, but is entirely fictitious. This does not represent any particular site and is meant to be a generic example. A

  9. Performance assessment handbook for low-level radioactive waste disposal facilities

    International Nuclear Information System (INIS)

    Seitz, R.R.; Garcia, R.S.; Kostelnik, K.M.; Starmer, R.J.

    1992-02-01

    Performance assessments of proposed low-level radioactive waste disposal facilities must be conducted to support licensing. This handbook provides a reference document that can be used as a resource by management and staff responsible for performance assessments. Brief discussions describe the performance assessment process and emphasize selected critical aspects of the process. References are also provided for additional information on many aspects of the performance assessment process. The user's manual for the National Low-Level Waste Management Program's Performance Assessment Center (PAC) on the Idaho National Engineering Laboratory Cray computer is included as Appendix A. The PAC provides users an opportunity to experiment with a number of performance assessment computer codes on a Cray computer. Appendix B describes input data required for 22 performance assessment codes

  10. Acoustic Performance of a Real-Time Three-Dimensional Sound-Reproduction System

    Science.gov (United States)

    Faller, Kenneth J., II; Rizzi, Stephen A.; Aumann, Aric R.

    2013-01-01

    The Exterior Effects Room (EER) is a 39-seat auditorium at the NASA Langley Research Center and was built to support psychoacoustic studies of aircraft community noise. The EER has a real-time simulation environment which includes a three-dimensional sound-reproduction system. This system requires real-time application of equalization filters to compensate for spectral coloration of the sound reproduction due to installation and room effects. This paper describes the efforts taken to develop the equalization filters for use in the real-time sound-reproduction system and the subsequent analysis of the system s acoustic performance. The acoustic performance of the compensated and uncompensated sound-reproduction system is assessed for its crossover performance, its performance under stationary and dynamic conditions, the maximum spatialized sound pressure level it can produce from a single virtual source, and for the spatial uniformity of a generated sound field. Additionally, application examples are given to illustrate the compensated sound-reproduction system performance using recorded aircraft flyovers

  11. High-Performance Operating Systems

    DEFF Research Database (Denmark)

    Sharp, Robin

    1999-01-01

    Notes prepared for the DTU course 49421 "High Performance Operating Systems". The notes deal with quantitative and qualitative techniques for use in the design and evaluation of operating systems in computer systems for which performance is an important parameter, such as real-time applications......, communication systems and multimedia systems....

  12. Performance assessment modeling of pyrometallurgical process wasteforms

    International Nuclear Information System (INIS)

    Nutt, W.M.; Hill, R.N.; Bullen, D.B.

    1995-01-01

    Performance assessment analyses have been completed to estimate the behavior of high-level nuclear wasteforms generated from the pyrometallurgical processing of liquid metal reactor (LMR) and light water reactor (LWR) spent nuclear fuel. Waste emplaced in the proposed repository at Yucca Mountain is investigated as the basis for the study. The resulting cumulative actinide and fission product releases to the accessible environment within a 100,000 year period from the various pyrometallurgical process wasteforms are compared to those of directly disposed LWR spent fuel using the same total repository system model. The impact of differing radionuclide transport models on the overall release characteristics is investigated

  13. Village malaria worker performance key to the elimination of artemisinin-resistant malaria: a Western Cambodia health system assessment.

    Science.gov (United States)

    Canavati, Sara E; Lawpoolsri, Saranath; Quintero, Cesia E; Nguon, Chea; Ly, Po; Pukrittayakamee, Sasithon; Sintasath, David; Singhasivanon, Pratap; Peeters Grietens, Koen; Whittaker, Maxine Anne

    2016-05-20

    Village malaria workers (VMWs) and mobile malaria workers (MMWs) are a critical component of Cambodia's national strategy to eliminate Plasmodium falciparum malaria by 2025. Since 2004, VMWs have been providing malaria diagnosis through the use of rapid diagnostic tests and free-of-charge artemisinin-based combination therapy in villages more than 5 km away from the closest health facility. They have also played a key role in the delivery of behaviour change communication interventions to this target population. This study aimed to assess the job performance of VMWs/MMWs, and identify challenges they face, which may impede elimination efforts. A mixed-methods assessment was conducted in five provinces of western Cambodia. One hundred and eighty five VMW/MMW participants were surveyed using a structured questionnaire. Qualitative data was gathered through a total of 60 focus group discussions and 65 in-depth interviews. Data triangulation of the qualitative and quantitative data was used during analysis. Overall, VMWs/MMWs met or exceeded the expected performance levels (80 %). Nevertheless, some performance gaps were identified. Misconceptions regarding malaria transmission and prevention were found among workers. The recommended approach for malaria treatment, directly-observed treatment (DOT), had low implementation rates. Stock-outs, difficulties in reaching out to migrant and mobile populations, insufficient means of transportation and dwindling worker satisfaction also affected job performance. VMW/MMW job performance must be increased from 80 to 100 % in order to achieve elimination. In order to do this, it is recommended for the national malaria programme to eliminate worker malaria knowledge gaps. Barriers to DOT implementation and health system failures also need to be addressed. The VMW programme should be expanded on several fronts in order to tackle remaining performance gaps. Findings from this evaluation are useful to inform the planning of future

  14. Performance evaluation of various cryogenic energy storage systems

    International Nuclear Information System (INIS)

    Abdo, Rodrigo F.; Pedro, Hugo T.C.; Koury, Ricardo N.N.; Machado, Luiz; Coimbra, Carlos F.M.; Porto, Matheus P.

    2015-01-01

    This work compares various CES (cryogenic energy storage) systems as possible candidates to store energy from renewable sources. Mitigating solar and wind power variability and its direct effect on local grid stability are already a substantial technological bottleneck for increasing market penetration of these technologies. In this context, CES systems represent low-cost solutions for variability that can be used to set critical power ramp rates. We investigate the different thermodynamic and engineering constraints that affect the design of CES systems, presenting theoretical simulations, indicating that optimization is also needed to improve the cryogenic plant performance. - Highlights: • We assessed the performance of cryogenic energy storage systems. • We re-evaluated the Linde–Hampson cycle proposed by Chen. • We proposed the Claude and Collins cycles as alternatives for the Linde–Hampson cycle. • We concluded that Claude cycle is the best alternative for the simulated conditions.

  15. The Impact of a Flexible Assessment System on Students' Motivation, Performance and Attitude

    Science.gov (United States)

    Pacharn, Parunchana; Bay, Darlene; Felton, Sandra

    2013-01-01

    We examine a flexible assessment system that allows students to determine the weights allocated to each course component and to re-allocate the weights in response to achieved scores. The flexibility is intended to encourage students' participation in the learning process, thereby promoting self-regulated learning skills. We compare this…

  16. Performance assessment of mass flow rate measurement capability in a large scale transient two-phase flow test system

    International Nuclear Information System (INIS)

    Nalezny, C.L.; Chapman, R.L.; Martinell, J.S.; Riordon, R.P.; Solbrig, C.W.

    1979-01-01

    Mass flow is an important measured variable in the Loss-of-Fluid Test (LOFT) Program. Large uncertainties in mass flow measurements in the LOFT piping during LOFT coolant experiments requires instrument testing in a transient two-phase flow loop that simulates the geometry of the LOFT piping. To satisfy this need, a transient two-phase flow loop has been designed and built. The load cell weighing system, which provides reference mass flow measurements, has been analyzed to assess its capability to provide the measurements. The analysis consisted of first performing a thermal-hydraulic analysis using RELAP4 to compute mass inventory and pressure fluctuations in the system and mass flow rate at the instrument location. RELAP4 output was used as input to a structural analysis code SAPIV which is used to determine load cell response. The computed load cell response was then smoothed and differentiated to compute mass flow rate from the system. Comparison between computed mass flow rate at the instrument location and mass flow rate from the system computed from the load cell output was used to evaluate mass flow measurement capability of the load cell weighing system. Results of the analysis indicate that the load cell weighing system will provide reference mass flows more accurately than the instruments now in LOFT

  17. Reviewing real-time performance of nuclear reactor safety systems

    International Nuclear Information System (INIS)

    Preckshot, G.G.

    1993-08-01

    The purpose of this paper is to recommend regulatory guidance for reviewers examining real-time performance of computer-based safety systems used in nuclear power plants. Three areas of guidance are covered in this report. The first area covers how to determine if, when, and what prototypes should be required of developers to make a convincing demonstration that specific problems have been solved or that performance goals have been met. The second area has recommendations for timing analyses that will prove that the real-time system will meet its safety-imposed deadlines. The third area has description of means for assessing expected or actual real-time performance before, during, and after development is completed. To ensure that the delivered real-time software product meets performance goals, the paper recommends certain types of code-execution and communications scheduling. Technical background is provided in the appendix on methods of timing analysis, scheduling real-time computations, prototyping, real-time software development approaches, modeling and measurement, and real-time operating systems

  18. Reviewing real-time performance of nuclear reactor safety systems

    Energy Technology Data Exchange (ETDEWEB)

    Preckshot, G.G. [Lawrence Livermore National Lab., CA (United States)

    1993-08-01

    The purpose of this paper is to recommend regulatory guidance for reviewers examining real-time performance of computer-based safety systems used in nuclear power plants. Three areas of guidance are covered in this report. The first area covers how to determine if, when, and what prototypes should be required of developers to make a convincing demonstration that specific problems have been solved or that performance goals have been met. The second area has recommendations for timing analyses that will prove that the real-time system will meet its safety-imposed deadlines. The third area has description of means for assessing expected or actual real-time performance before, during, and after development is completed. To ensure that the delivered real-time software product meets performance goals, the paper recommends certain types of code-execution and communications scheduling. Technical background is provided in the appendix on methods of timing analysis, scheduling real-time computations, prototyping, real-time software development approaches, modeling and measurement, and real-time operating systems.

  19. Honeywell Cascade Distiller System Performance Testing Interim Results

    Science.gov (United States)

    Callahan, Michael R.; Sargusingh, Miriam

    2014-01-01

    The ability to recover and purify water through physiochemical processes is crucial for realizing long-term human space missions, including both planetary habitation and space travel. Because of their robust nature, distillation systems have been actively pursued as one of the technologies for water recovery. The Cascade Distillation System (CDS) is a vacuum rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. The CDS was previously under development through Honeywell and NASA. In 2009, an assessment was performed to collect data to support down-selection and development of a primary distillation technology for application in a lunar outpost water recovery system. Based on the results of this testing, an expert panel concluded that the CDS showed adequate development maturity, TRL-4, together with the best product water quality and competitive weight and power estimates to warrant further development. The Advanced Exploration Systems (AES) Water Recovery Project (WRP) worked to address weaknesses identified by The Panel; namely bearing design and heat pump power efficiency. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades. The CDS will also have been challenged with ISS analog waste streams and a subset of those being considered for Exploration architectures. This paper details interim results of the AES WRP CDS performance testing.

  20. Stochastic hydrogeologic units and hydrogeologic properties development for total-system performance assessments. Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Schenker, A.R.; Guerin, D.C.; Robey, T.H.; Rautman, C.A.; Barnard, R.W.

    1995-09-01

    A stochastic representation of the lithologic units and associated hydrogeologic parameters of the potential high-level nuclear waste repository are developed for use in performance-assessment calculations, including the Total-System Performance Assessment for Yucca Mountain-SNL Second Iteration (TSPA-1993). A simplified lithologic model has been developed based on the physical characteristics of the welded and nonwelded units at Yucca Mountain. Ten hydrogeologic units are developed from site-specific data (lithologic and geophysical logs and core photographs) obtained from the unsaturated and saturated zones. The three-dimensional geostatistical model of the ten hydrogeologic units is based on indicator-coding techniques and improves on the two-dimensional model developed for TSPA91. The hydrogeologic properties (statistics and probability distribution functions) are developed from the results of laboratory tests and in-situ aquifer tests or are derived through fundamental relationships. Hydrogeologic properties for matrix properties, bulk conductivities, and fractures are developed from existing site specific data. Extensive data are available for matrix porosity, bulk density, and matrix saturated conductivity. For other hydrogeologic properties, the data are minimal or nonexistent. Parameters for the properties are developed as beta probability distribution functions. For the model units without enough data for analysis, parameters are developed as analogs to existing units. A relational, analytic approach coupled with bulk conductivity parameters is used to develop fracture parameters based on the smooth-wall-parallel-plate theory. An analytic method is introduced for scaling small-core matrix properties to the hydrogeologic unit scales

  1. API REST Web service and backend system Of Lecturer’s Assessment Information System on Politeknik Negeri Bali

    Science.gov (United States)

    Manuaba, I. B. P.; Rudiastini, E.

    2018-01-01

    Assessment of lecturers is a tool used to measure lecturer performance. Lecturer’s assessment variable can be measured from three aspects : teaching activities, research and community service. Broad aspect to measure the performance of lecturers requires a special framework, so that the system can be developed in a sustainable manner. Issues of this research is to create a API web service data tool, so the lecturer assessment system can be developed in various frameworks. The research was developed with web service and php programming language with the output of json extension data. The conclusion of this research is API web service data application can be developed using several platforms such as web, mobile application

  2. The Role of Education in Health System Performance

    Science.gov (United States)

    Grignon, Michel

    2008-01-01

    I investigate the role of education on health, using country-level data and the production frontier framework suggested by the World Health Organization (WHO) to assess performances of health care systems. I find that the impact of human capital on health is much smaller than suggested by the WHO frontier model, and the relationship exhibits…

  3. Performance systems and social capital

    DEFF Research Database (Denmark)

    Rasmussen, Grane Mikael Gregaard; Edwards, Kasper

    2014-01-01

    Performance systems and social capital are considered mutually exclusive. Contemporary studies show that social capital is essential in generating performance improvement. This raises an important question: “How do performance systems and social capital correspond?” This study draws on findings...... from a study on implementation of a performance system in Danish construction. The results show causalities between implementing the performance system and the emergence of social capital in construction projects. Results indicate that performance systems and social capital is not mutually exclusive...

  4. Assessment of solar-assisted gas-fired heat pump systems

    Science.gov (United States)

    Lansing, F. L.

    1981-01-01

    As a possible application for the Goldstone Energy Project, the performance of a 10 ton heat pump unit using a hybrid solar gas energy source was evaluated in an effort to optimize the solar collector size. The heat pump system is designed to provide all the cooling and/or heating requirements of a selected office building. The system performance is to be augmented in the heating mode by utilizing the waste heat from the power cycle. A simplified system analysis is described to assess and compute interrrelationships of the engine, heat pump, and solar and building performance parameters, and to optimize the solar concentrator/building area ratio for a minimum total system cost. In addition, four alternative heating cooling systems, commonly used for building comfort, are described; their costs are compared, and are found to be less competitive with the gas solar heat pump system at the projected solar equipment costs.

  5. Distributed road assessment system

    Science.gov (United States)

    Beer, N. Reginald; Paglieroni, David W

    2014-03-25

    A system that detects damage on or below the surface of a paved structure or pavement is provided. A distributed road assessment system includes road assessment pods and a road assessment server. Each road assessment pod includes a ground-penetrating radar antenna array and a detection system that detects road damage from the return signals as the vehicle on which the pod is mounted travels down a road. Each road assessment pod transmits to the road assessment server occurrence information describing each occurrence of road damage that is newly detected on a current scan of a road. The road assessment server maintains a road damage database of occurrence information describing the previously detected occurrences of road damage. After the road assessment server receives occurrence information for newly detected occurrences of road damage for a portion of a road, the road assessment server determines which newly detected occurrences correspond to which previously detected occurrences of road damage.

  6. Probabilistic safety assessment based expert systems in support of dynamic risk assessment

    International Nuclear Information System (INIS)

    Varde, P.V.; Sharma, U.L.; Marik, S.K.; Raina, V.K.; Tikku, A.C.

    2006-01-01

    Probabilistic Safety Assessment (PSA) studies are being performed, world over as part of integrated risk assessment for Nuclear Power Plants and in many cases PSA insight is utilized in support of decision making. Though the modern plants are built with inherent safety provisions, particularly to reduce the supervisory requirements during initial period into the accident, it is always desired to develop an efficient user friendly real-time operator advisory system for handling of plant transients/emergencies which would be of immense benefit for the enhancement of operational safety of the plant. This paper discusses an integrated approach for the development of operator support system. In this approach, PSA methodology and the insight obtained from PSA has been utilized for development of knowledge based or rule based experts system. While Artificial Neural Network (ANN) approach has been employed for transient identification, rule-base expert system shell environment was used for the development of diagnostic module in this system. Attempt has been made to demonstrate that this approach offers an efficient framework for addressing requirements related to handling of real-time/dynamic scenario. (author)

  7. Policy and Validity Prospects for Performance-Based Assessment.

    Science.gov (United States)

    Baker, Eva L.; And Others

    1994-01-01

    This article describes performance-based assessment as expounded by its proponents, comments on these conceptions, reviews evidence regarding the technical quality of performance-based assessment, and considers its validity under various policy options. (JDD)

  8. Performance assessment, social accountability and sustainability governance in Hangzhou: Leveraging the implementation gap?

    DEFF Research Database (Denmark)

    Delman, Jørgen

    This is an explorative case study that examines how ideas and concepts relating to sustainable development are factored into new approaches to urban governance in Hangzhou. The proposition is that traditional performance assessment procedures combined with innovative surveys of the city government......’s social accountability and with various forms of social participation have created a new framework for urban governance, both conceptually and as a series of practical measures. More specifically, the study examines a dramatic redesign of the performance assessment system in Hangzhou aimed at developing...

  9. Behavior model for performance assessment

    International Nuclear Information System (INIS)

    Brown-VanHoozer, S. A.

    1999-01-01

    Every individual channels information differently based on their preference of the sensory modality or representational system (visual auditory or kinesthetic) we tend to favor most (our primary representational system (PRS)). Therefore, some of us access and store our information primarily visually first, some auditorily, and others kinesthetically (through feel and touch); which in turn establishes our information processing patterns and strategies and external to internal (and subsequently vice versa) experiential language representation. Because of the different ways we channel our information, each of us will respond differently to a task--the way we gather and process the external information (input), our response time (process), and the outcome (behavior). Traditional human models of decision making and response time focus on perception, cognitive and motor systems stimulated and influenced by the three sensory modalities, visual, auditory and kinesthetic. For us, these are the building blocks to knowing how someone is thinking. Being aware of what is taking place and how to ask questions is essential in assessing performance toward reducing human errors. Existing models give predications based on time values or response times for a particular event, and may be summed and averaged for a generalization of behavior(s). However, by our not establishing a basic understanding of the foundation of how the behavior was predicated through a decision making strategy process, predicative models are overall inefficient in their analysis of the means by which behavior was generated. What is seen is the end result

  10. Behavior model for performance assessment.

    Energy Technology Data Exchange (ETDEWEB)

    Borwn-VanHoozer, S. A.

    1999-07-23

    Every individual channels information differently based on their preference of the sensory modality or representational system (visual auditory or kinesthetic) we tend to favor most (our primary representational system (PRS)). Therefore, some of us access and store our information primarily visually first, some auditorily, and others kinesthetically (through feel and touch); which in turn establishes our information processing patterns and strategies and external to internal (and subsequently vice versa) experiential language representation. Because of the different ways we channel our information, each of us will respond differently to a task--the way we gather and process the external information (input), our response time (process), and the outcome (behavior). Traditional human models of decision making and response time focus on perception, cognitive and motor systems stimulated and influenced by the three sensory modalities, visual, auditory and kinesthetic. For us, these are the building blocks to knowing how someone is thinking. Being aware of what is taking place and how to ask questions is essential in assessing performance toward reducing human errors. Existing models give predications based on time values or response times for a particular event, and may be summed and averaged for a generalization of behavior(s). However, by our not establishing a basic understanding of the foundation of how the behavior was predicated through a decision making strategy process, predicative models are overall inefficient in their analysis of the means by which behavior was generated. What is seen is the end result.

  11. Organic migration forms of radionuclides and performance assessment

    International Nuclear Information System (INIS)

    Xu Gouqing

    2010-01-01

    Much attention is paid to inorganic migration forms of radionuclides in groundwater during performance assessment before and organic migration forms, are seldom noted. Therefore some question may come into confidence level in performance assessment. This paper mainly discusses the distribution of organic substances in groundwater and their potential effect on performance assessment. The results obtained in recent years show that clay rocks are generally impermeable to water, but in some cases the interstitial water may be observed in them and the concentration of DOC, HA and FA is rather higher than that in granitic groundwater. The concentration of DOC is relatively low in granitic groundwater, but up to now the effect of organic migration forms of radionuclides in granitic groundwater on performance assessment is not finally determined, it is necessary to make further investigations. (authors)

  12. Institutionalization of safety re-assessment system for operating nuclear power plants

    International Nuclear Information System (INIS)

    Kim, H. J.; Cho, J. C.; Min, B. K.; Park, J. S.; Jung, H. D.; Oh, K. M.; Kim, W. K.; Lim, J. H.

    1999-01-01

    In this study, in-depth reviews of the foreign countries' experiences and practices in applications of the periodic safety review (PSR), backfitting and license renewal systems as well as the current status of nuclear power safety assurance programs and activities in Korea have been performed to investigate the necessity and feasibility of the application of the systems for the domestic operating nuclear power plants and to establish effective strategy and methodology for the institutionalization of a periodic safety re-assessment system appropriate to both the domestic and international nuclear power environments by incorporating the PSR with the backfitting and license renewal systems. For these purposes, the regulatory policy, fundamental principles and detailed requirements for the institutionalization of the safety re-assessment system and the effective measures for active implementation of the backfitting program have been developed and then a comparative study of benefits and shortcomings has been conducted for the three different models of the periodic safety re-assessment system incorporated with either the license renewal or life extension process, which have been considered as practicable ones in the domestic situation. The model chosen in this study as the most appropriate safety re-assessment system is the one that the re-assessments are performed at the interval of ten years throughout the service life of nuclear power plant and the ten-year license renewal or life extension after the expiration of design life can be permitted based on the regulatory review of the re-assessment results and follow-up measures. Finally, this paper has discussed on the details of the requirements, approach and procedures established for the institutionalization of the periodic safety re-assessment system chosen as the most appropriate one for domestic applications

  13. Site Characterization and Preliminary Performance Assessment Calculation Applied To JAEA-Horonobe URL Site of Japan

    International Nuclear Information System (INIS)

    Lim, Doo Hyun; Hatanaka, Koichiro; Ishii, Eiichi

    2010-01-01

    JAEA-Horonobe Underground Research Laboratory (URL) is designed for research and development on high-level radioactive waste (HLW) repository in sedimentary rock. For a potential HLW repository, understanding and implementing fracturing and faulting system, with data from the site characterization, into the performance assessment is essential because fracture and fault will be the major conductors or barriers for the groundwater flow and radionuclide release. The objectives are i) quantitative derivation of characteristics and correlation of fracturing/faulting system with geologic and geophysics data obtained from the site characterization, and ii) preliminary performance assessment calculation with characterized site information

  14. Site Characterization and Preliminary Performance Assessment Calculation Applied To JAEA-Horonobe URL Site of Japan

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Doo Hyun [NE Union Hill Road, Suite 200, WA 98052 (United States); Hatanaka, Koichiro; Ishii, Eiichi [Japan Atomic Energy Agency, Hokkaido (Japan)

    2010-10-15

    JAEA-Horonobe Underground Research Laboratory (URL) is designed for research and development on high-level radioactive waste (HLW) repository in sedimentary rock. For a potential HLW repository, understanding and implementing fracturing and faulting system, with data from the site characterization, into the performance assessment is essential because fracture and fault will be the major conductors or barriers for the groundwater flow and radionuclide release. The objectives are i) quantitative derivation of characteristics and correlation of fracturing/faulting system with geologic and geophysics data obtained from the site characterization, and ii) preliminary performance assessment calculation with characterized site information

  15. Chemical buffering in natural and engineered barrier systems: Thermodynamic constraints and performance assessment consequences

    International Nuclear Information System (INIS)

    Arthur, R.C.; Wei Zhou

    2000-12-01

    Thermodynamic and kinetic constraints on the chemical buffering properties of natural and engineered-barrier systems are derived in this study from theoretical descriptions, incorporated in the reaction-path model, of reversible and irreversible mass transfer in multicomponent, multiphase systems. The buffering properties of such systems are conditional properties because they refer to a specific aqueous species in a system that is open with respect to a specific reactant. The solution to a mathematical statement of this concept requires evaluation of the dependence of the activity of the buffered species on incremental changes in the overall reaction-progress variable. This dependence can be represented by a truncated Taylor's series expansion, where the values of associated derivatives are calculated using finite-difference techniques and mass-balance, charge-balance and mass-action constraints. Kinetic constraints on buffering behavior can also be described if the relation between reactant flux and reaction rate is well defined. This relation is explicit for the important case of advective groundwater flow and water-rock interaction. We apply the theoretical basis of the chemical buffering concept to processes that could affect the performance of a deep geologic repository for nuclear waste. Specifically, we focus on the likelihood that an inverse relation must exist between the buffer intensity and the migration velocity of reaction fronts in systems involving advective or diffusive mass transport. A quantitative understanding of this relation would provide the basis for evaluating the potential role of chemical buffering in achieving the isolation and retardation functions, of the EBS and geosphere in a KBS-3 repository. Our preliminary evaluation of this role considers the effects of chemical buffering on the propagation velocity of a pH front in both the near- and far field. We use a geochemical modeling technique compatible with the reaction-path model to

  16. Scenario-based resilience assessment framework for critical infrastructure systems: Case study for seismic resilience of seaports

    International Nuclear Information System (INIS)

    Shafieezadeh, Abdollah; Ivey Burden, Lindsay

    2014-01-01

    A number of metrics in the past have been proposed and numerically implemented to assess the overall performance of large systems during natural disasters and their recovery in the aftermath of the events. Among such performance measures, resilience is a reliable metric. This paper proposes a probabilistic framework for scenario-based resilience assessment of infrastructure systems. The method accounts for uncertainties in the process including the correlation of the earthquake intensity measures, fragility assessment of structural components, estimation of repair requirements, the repair process, and finally the service demands. The proposed method is applied to a hypothetical seaport terminal and the system level performance of the seaport is assessed using various performance metrics. Results of this analysis have shown that medium to large seismic events may significantly disrupt the operation of seaports right after the event and the recovery process may take months. The proposed framework will enable port stakeholders to systematically assess the most-likely performance of the system during expected future earthquake events. - Highlights: • A scenario-based framework for seismic resilience assessment of systems is presented. • Seismic resilience of a hypothetical seaport with realistic settings is studied. • Berth availability is found to govern seaport functionality following earthquakes

  17. Assessing a cross-border logistics policy using a performance measurement system framework: the case of Hong Kong and the Pearl River Delta region

    Science.gov (United States)

    Wong, David W. C.; Choy, K. L.; Chow, Harry K. H.; Lin, Canhong

    2014-06-01

    For the most rapidly growing economic entity in the world, China, a new logistics operation called the indirect cross-border supply chain model has recently emerged. The primary idea of this model is to reduce logistics costs by storing goods at a bonded warehouse with low storage cost in certain Chinese regions, such as the Pearl River Delta (PRD). This research proposes a performance measurement system (PMS) framework to assess the direct and indirect cross-border supply chain models. The PMS covers four categories including cost, time, quality and flexibility in the assessment of the performance of direct and indirect models. Furthermore, a survey was conducted to investigate the logistics performance of third party logistics (3PLs) at the PRD regions, including Guangzhou, Shenzhen and Hong Kong. The significance of the proposed PMS framework allows 3PLs accurately pinpoint the weakness and strengths of it current operations policy at four major performance measurement categories. Hence, this helps 3PLs further enhance the competitiveness and operations efficiency through better resources allocation at the area of warehousing and transportation.

  18. Corral Monitoring System assessment results

    International Nuclear Information System (INIS)

    Filby, E.E.; Haskel, K.J.

    1998-03-01

    This report describes the results of a functional and operational assessment of the Corral Monitoring Systems (CMS), which was designed to detect and document accountable items entering or leaving a monitored site. Its development was motivated by the possibility that multiple sites in the nuclear weapons states of the former Soviet Union might be opened to such monitoring under the provisions of the Strategic Arms Reduction Treaty. The assessment was performed at three levels. One level evaluated how well the planned approach addressed the target application, and which involved tracking sensitive items moving into and around a site being monitored as part of an international treaty or other agreement. The second level examined the overall design and development approach, while the third focused on individual subsystems within the total package. Unfortunately, the system was delivered as disassembled parts and pieces, with very poor documentation. Thus, the assessment was based on fragmentary operating data coupled with an analysis of what documents were provided with the system. The system design seemed to be a reasonable match to the requirements of the target application; however, important questions about site manning and top level administrative control were left unanswered. Four weaknesses in the overall design and development approach were detected: (1) poor configuration control and management, (2) inadequate adherence to a well defined architectural standard, (3) no apparent provision for improving top level error tolerance, and (4) weaknesses in the object oriented programming approach. The individual subsystems were found to offer few features or capabilities that were new or unique, even at the conceptual level. The CMS might possibly have offered a unique combination of features, but this level of integration was never realized, and it had no unique capabilities that could be readily extracted for use in another system

  19. Corral Monitoring System assessment results

    Energy Technology Data Exchange (ETDEWEB)

    Filby, E.E.; Haskel, K.J.

    1998-03-01

    This report describes the results of a functional and operational assessment of the Corral Monitoring Systems (CMS), which was designed to detect and document accountable items entering or leaving a monitored site. Its development was motivated by the possibility that multiple sites in the nuclear weapons states of the former Soviet Union might be opened to such monitoring under the provisions of the Strategic Arms Reduction Treaty. The assessment was performed at three levels. One level evaluated how well the planned approach addressed the target application, and which involved tracking sensitive items moving into and around a site being monitored as part of an international treaty or other agreement. The second level examined the overall design and development approach, while the third focused on individual subsystems within the total package. Unfortunately, the system was delivered as disassembled parts and pieces, with very poor documentation. Thus, the assessment was based on fragmentary operating data coupled with an analysis of what documents were provided with the system. The system design seemed to be a reasonable match to the requirements of the target application; however, important questions about site manning and top level administrative control were left unanswered. Four weaknesses in the overall design and development approach were detected: (1) poor configuration control and management, (2) inadequate adherence to a well defined architectural standard, (3) no apparent provision for improving top level error tolerance, and (4) weaknesses in the object oriented programming approach. The individual subsystems were found to offer few features or capabilities that were new or unique, even at the conceptual level. The CMS might possibly have offered a unique combination of features, but this level of integration was never realized, and it had no unique capabilities that could be readily extracted for use in another system.

  20. Application of optimization methods for nuclear energy system performance assessment by the MESSAGE software

    International Nuclear Information System (INIS)

    Andrianov, A.A.; Kuptsov, I.S.; Utyanskaya, T.V.

    2016-01-01

    This paper defines the multi-objective optimization and uncertainty treatment modules for the IAEA energy planning software MESSAGE intended for multi-objective optimization and sustainability assessments of innovative nuclear energy systems with account of uncertainty [ru

  1. Performance of community health workers:situating their intermediary position within complex adaptive health systems

    OpenAIRE

    Kok, Maryse. C; Broerse, Jacqueline E.W; Theobald, Sally; Ormel, Hermen; Dieleman, Marjolein; Taegtmeyer, Miriam

    2017-01-01

    Health systems are social institutions, in which health worker performance is shaped by transactional processes between different actors. This analytical assessment unravels the complex web of factors that influence the performance of community health workers (CHWs) in low- and middle-income countries. It examines their unique intermediary position between the communities they serve and actors in the health sector, and the complexity of the health systems in which they operate. The assessment...

  2. Personality, Assessment Methods and Academic Performance

    Science.gov (United States)

    Furnham, Adrian; Nuygards, Sarah; Chamorro-Premuzic, Tomas

    2013-01-01

    This study examines the relationship between personality and two different academic performance (AP) assessment methods, namely exams and coursework. It aimed to examine whether the relationship between traits and AP was consistent across self-reported versus documented exam results, two different assessment techniques and across different…

  3. Similar performance of Brasfield and Wisconsin scoring systems in young children with cystic fibrosis

    Energy Technology Data Exchange (ETDEWEB)

    Cleveland, Robert H.; Stamoulis, Catherine [Boston Children' s Hospital, Harvard Medical School, Department of Radiology, Boston, MA (United States); Sawicki, Gregory S. [Boston Children' s Hospital, Harvard Medical School, Division of Respiratory Diseases, Department of Medicine, Boston, MA (United States)

    2015-10-15

    To assess the severity of lung disease in cystic fibrosis (CF), scoring systems based on chest radiographs (CXRs), CT and MRI have been used extensively, although primarily in research settings rather than for clinical purposes. It has recently been shown that those based on CXRs (primarily the Brasfield and Wisconsin systems) are as sensitive and valid as those based on CT. The reproducibility and correlation of both systems to pulmonary function tests (PFTs) were recently investigated and were found to be statistically identical. However, the relative performance of these systems has not been specifically assessed in children younger than 5 years old with mild lung disease, a critical age range in which PFTs is rarely performed. To investigate and compare the performance of the Brasfield and Wisconsin systems in children 0-5 years old with predominantly mild lung disease. Fifty-five patients 0-5 years old with 105 CXRs were included in the study. Given that the goal was to compare system performance in mild disease, only the first two CXRs from each patient were included (all but five patients had two images). When only one image was available in the target age range, it only was included. Agreement between the Brasfield and Wisconsin systems was assessed using a 2X2 contingency table assuming binary classification of CF lung disease using CXR scoring systems (mild vs. non-mild). In the absence of PFTs or another external gold standard for comparison, the Wisconsin system was used as an arbitrary gold standard against which the Brasfield was compared. Correlation between the two systems was assessed via a concordance correlation coefficient (CCC) for repeated measures. Scores were rated as mild or non-mild based on published numerical cutoffs for each system. The systems agreed on 89/105 (85%) and disagreed on 16/105 (15%) of the CXRs. Agreement between the two systems was statistically significant (P < 0.001). Relative sensitivity and specificity of the

  4. Evidence for validity within workplace assessment: the Longitudinal Evaluation of Performance (LEP).

    Science.gov (United States)

    Prescott-Clements, Linda; van der Vleuten, Cees P M; Schuwirth, Lambert W T; Hurst, Yvonne; Rennie, James S

    2008-05-01

    The drive towards valid and reliable assessment methods for health professions' training is becoming increasingly focused towards authentic models of workplace performance assessment. This study investigates the validity of such a method, longitudinal evaluation of performance (LEP), which has been implemented in the assessment of postgraduate dental trainees in Scotland. Although it is similar in format to the mini-CEX (mini clinical evaluation exercise) and other tools that use global ratings for assessing performance in the workplace, a number of differences exist in the way in which the LEP has been implemented. These include the use of a reference point for evaluators' judgement that represents the standard expected upon completion of the training, flexibility, a greater range of cases assessed and the use of frequency scores within feedback to identify trainees' progress over time. A range of qualitative and quantitative data were collected and analysed from 2 consecutive cohorts of trainees in Scotland (2002-03 and 2003-04). There is rich evidence supporting the validity, educational impact and feasibility of the LEP. In particular, a great deal of support was given by trainers for the use of a fixed reference point for judgements, despite initial concerns that this might be demotivating to trainees. Trainers were highly positive about this approach and considered it useful in identifying trainees' progress and helping to drive learning. The LEP has been successful in combining a strong formative approach to continuous assessment with the collection of evidence on performance within the workplace that (alongside other tools within an assessment system) can contribute towards a summative decision regarding competence.

  5. Dehydration: physiology, assessment, and performance effects.

    Science.gov (United States)

    Cheuvront, Samuel N; Kenefick, Robert W

    2014-01-01

    This article provides a comprehensive review of dehydration assessment and presents a unique evaluation of the dehydration and performance literature. The importance of osmolality and volume are emphasized when discussing the physiology, assessment, and performance effects of dehydration. The underappreciated physiologic distinction between a loss of hypo-osmotic body water (intracellular dehydration) and an iso-osmotic loss of body water (extracellular dehydration) is presented and argued as the single most essential aspect of dehydration assessment. The importance of diagnostic and biological variation analyses to dehydration assessment methods is reviewed and their use in gauging the true potential of any dehydration assessment method highlighted. The necessity for establishing proper baselines is discussed, as is the magnitude of dehydration required to elicit reliable and detectable osmotic or volume-mediated compensatory physiologic responses. The discussion of physiologic responses further helps inform and explain our analysis of the literature suggesting a ≥ 2% dehydration threshold for impaired endurance exercise performance mediated by volume loss. In contrast, no clear threshold or plausible mechanism(s) support the marginal, but potentially important, impairment in strength, and power observed with dehydration. Similarly, the potential for dehydration to impair cognition appears small and related primarily to distraction or discomfort. The impact of dehydration on any particular sport skill or task is therefore likely dependent upon the makeup of the task itself (e.g., endurance, strength, cognitive, and motor skill). © 2014 American Physiological Society.

  6. Performing the lockout/tagout risk assessment.

    Science.gov (United States)

    Wallace, W Jon

    2007-03-01

    Lockout/tagout provides the greatest level routine, repetitive, and integral to the production process, a risk assessment should be performed. If the task performed poses an unacceptable risk, acceptable risk reduction methods should be implemented to reduce the risk to acceptable levels.

  7. EMPIRICAL RESEARCH ON THE STRUCTURE OF A SYSTEM FOR ASSESSMENT OF THE GLOBAL PERFORMANCE OF ECONOMIC ENTITIES

    Directory of Open Access Journals (Sweden)

    Pintea Mirela-Oana

    2012-07-01

    Full Text Available Sustainable development and, therefore, globalization require new standards of performance that exceeds the economic field, both for domestic companies as well as international ones. So, these standards should be integrated into corporate strategy development to ensure sustainability of activities undertaken by harmonizing the economic, social and environmental objectives. For sustainable development of an entity, value creation can not be seen in strictly financial terms, therefore any strategies that are defined by entities concerns not only the quantitative aspects (economic-financial but also qualitative aspects (social and environmental. This study attempts to address the issue of building a set of indicators to assess overall performance and it stops at each of the three dimensions of performance, namely economic performance, social performance and environmental performance. In this scientific approach we try to stop on one of the priorities of economic research that is finding indicators that better reflect the three dimensions of performance. What indicators would best represent the overall performance?, What indicators would best represent the financial performance?, What indicators would best represent social performance?, What would be the best indicators of environmental performance? During this scientific approach will try to answer each of these questions through the empirical research conducted. To do this research we focused on statistical population consisting of the following categories of analysts: analysts from academic environment (Cluj-Napoca, Bucharest, Timisoara, Iasi, Craiova, Sibiu, Pitesti, Galati and financial analysts from the specific departments of the Financial Investment Services Company (Broker SA, BT Securities, Target Capital, Tradeville, Estinvest, Intercapital, KBC Securities, etc.. This distinction was made because we believe that in determining the optimal structure of such a model we need the views of

  8. Results from synthesis of calculation cases illustrating overall system performance in the safety assessment in H12 report

    International Nuclear Information System (INIS)

    Makino, Hitoshi; Sawada, Atsushi; Wakasugi, Keiichiro; Kato, Tomoko; Uchida, Masahiro; Miyahara, Kaname

    2002-02-01

    JNC (Japan Nuclear Cycle Development Institute) had proceeded R and D activities to provide a scientific and technical basis for geological disposal of HLW in Japan. The second progress report (H12) documented the progress of R and D and the Japanese version was submitted to the AEC (the Atomic Energy Commission) in November 1999. This report summarizes the calculation results for nuclide migration in 'Synthesis of Calculation Cases Illustrating Overall System Performance', which are performed to examine the safety of the geological disposal concept in Japan in the Safety Assessment in H12 Report. In addition, a set of calculation result for nuclide migration through each pathway in one-dimensional multiple pathway model (a set of 48 segments) are summarized for the Reference Case in H12 Report, and calculated dose conversion factors are also summarized against the combinations of potential Geosphere-Biosphere Interfaces (GBI) and potential exposure groups. Digital data of the calculation results are summarized in Appendix CD-ROM as Microsoft EXCEL files. (author)

  9. Life cycle assessment of a packaging waste recycling system in Portugal

    International Nuclear Information System (INIS)

    Ferreira, S.; Cabral, M.; Cruz, N.F. da; Simões, P.; Marques, R.C.

    2014-01-01

    Highlights: • We modeled a real packaging waste recycling system. • The analysis was performed using the life cycle assessment methodology. • The 2010 situation was compared with scenarios where the materials were not recycled. • The “Baseline” scenario seems to be more beneficial to the environment. - Abstract: Life Cycle Assessment (LCA) has been used to assess the environmental impacts associated with an activity or product life cycle. It has also been applied to assess the environmental performance related to waste management activities. This study analyses the packaging waste management system of a local public authority in Portugal. The operations of selective and refuse collection, sorting, recycling, landfilling and incineration of packaging waste were considered. The packaging waste management system in operation in 2010, which we called “Baseline” scenario, was compared with two hypothetical scenarios where all the packaging waste that was selectively collected in 2010 would undergo the refuse collection system and would be sent directly to incineration (called “Incineration” scenario) or to landfill (“Landfill” scenario). Overall, the results show that the “Baseline” scenario is more environmentally sound than the hypothetical scenarios

  10. Life cycle assessment of a packaging waste recycling system in Portugal

    Energy Technology Data Exchange (ETDEWEB)

    Ferreira, S.; Cabral, M. [CEG-IST, ULisboa, Av. Rovisco Pais, 1049-001 Lisbon (Portugal); Cruz, N.F. da, E-mail: nunocruz@tecnico.ulisboa.pt [IST, ULisboa, Av. Rovisco Pais, 1049-001 Lisbon (Portugal); Simões, P. [IST, ULisboa, Av. Rovisco Pais, 1049-001 Lisbon (Portugal); Marques, R.C. [CESUR, IST, ULisboa, Av. Rovisco Pais, 1049-001 Lisbon (Portugal)

    2014-09-15

    Highlights: • We modeled a real packaging waste recycling system. • The analysis was performed using the life cycle assessment methodology. • The 2010 situation was compared with scenarios where the materials were not recycled. • The “Baseline” scenario seems to be more beneficial to the environment. - Abstract: Life Cycle Assessment (LCA) has been used to assess the environmental impacts associated with an activity or product life cycle. It has also been applied to assess the environmental performance related to waste management activities. This study analyses the packaging waste management system of a local public authority in Portugal. The operations of selective and refuse collection, sorting, recycling, landfilling and incineration of packaging waste were considered. The packaging waste management system in operation in 2010, which we called “Baseline” scenario, was compared with two hypothetical scenarios where all the packaging waste that was selectively collected in 2010 would undergo the refuse collection system and would be sent directly to incineration (called “Incineration” scenario) or to landfill (“Landfill” scenario). Overall, the results show that the “Baseline” scenario is more environmentally sound than the hypothetical scenarios.

  11. Performance assessment for low-level radioactive waste disposal

    International Nuclear Information System (INIS)

    Cook, J.R.; Hsu, R.H.; Wilhite, E.L.; Yu, A.D.

    1996-01-01

    In October 1994 the Savannah River Site became the first US DOE complex to use concrete vaults to dispose of low-level radioactive solid waste and better prevent soil and groundwater contamination. This article describes the design and gives a performance assessment of the vaults. Topics include the following: Performance objectives; scope; the performance assessment process-assemble a multidisciplinary working group; collect available data; define credible pathways/scenarios; develop conceptual models; conduct screening and detailed model calculations; assess sensitivity/uncertainty; integrate and interpret results; report. 9 figs., 3 tabs

  12. A computer-aided continuous assessment system

    Directory of Open Access Journals (Sweden)

    B. C.H. Turton

    1996-12-01

    Full Text Available Universities within the United Kingdom have had to cope with a massive expansion in undergraduate student numbers over the last five years (Committee of Scottish University Principals, 1993; CVCP Briefing Note, 1994. In addition, there has been a move towards modularization and a closer monitoring of a student's progress throughout the year. Since the price/performance ratio of computer systems has continued to improve, Computer- Assisted Learning (CAL has become an attractive option. (Fry, 1990; Benford et al, 1994; Laurillard et al, 1994. To this end, the Universities Funding Council (UFQ has funded the Teaching and Learning Technology Programme (TLTP. However universities also have a duty to assess as well as to teach. This paper describes a Computer-Aided Assessment (CAA system capable of assisting in grading students and providing feedback. In this particular case, a continuously assessed course (Low-Level Languages of over 100 students is considered. Typically, three man-days are required to mark one assessed piece of coursework from the students in this class. Any feedback on how the questions were dealt with by the student are of necessity brief. Most of the feedback is provided in a tutorial session that covers the pitfalls encountered by the majority of the students.

  13. The influence of system quality characteristics on health care providers’ performance: Empirical evidence from Malaysia

    Directory of Open Access Journals (Sweden)

    Mohd Idzwan Mohd Salleh

    2016-11-01

    Full Text Available Summary: Background: The Ministry of Health Malaysia initiated the total hospital information system (THIS as the first national electronic health record system for use in selected public hospitals across the country. Since its implementation 15 years ago, there has been the critical requirement for a systematic evaluation to assess its effectiveness in coping with the current system, task complexity, and rapid technological changes. The study aims to assess system quality factors to predict the performance of electronic health in a single public hospital in Malaysia. Methods: Non-probability sampling was employed for data collection among selected providers in a single hospital for two months. Data cleaning and bias checking were performed before final analysis in partial least squares-structural equation modeling. Results and conclusions: Convergent and discriminant validity assessments were satisfied the required criterions in the reflective measurement model. The structural model output revealed that the proposed adequate infrastructure, system interoperability, security control, and system compatibility were the significant predictors, where system compatibility became the most critical characteristic to influence an individual health care provider’s performance. The previous DeLone and McLean information system success models should be extended to incorporate these technological factors in the medical system research domain to examine the effectiveness of modern electronic health record systems. In this study, care providers’ performance was expected when the system usage fits with patients’ needs that eventually increased their productivity. Keywords: Electronic health records system, System quality characteristics, Care providers’ performance, Evaluation, Partial least squares-structural equation modeling

  14. IMPLEMENTASI PERFORMANCE ASSESSMENT DALAM EVALUASI HASIL BELAJAR MAHASISWA PADA MATA KULIAH TEORI PRAKTEK BOLA VOLI

    Directory of Open Access Journals (Sweden)

    - Nasuka

    2010-04-01

    Full Text Available Volleyball subject is both theory and practice subject. In accordance with the standards of competence and basic competence to be achieved, this course, beside providing the theory of playing volleyball game, also consist of playing the game in the field. Based on the characteristics of the course it is necessary to assess both theory and practice aspect. Performance assessment is an alternative assessment that covers all aspects of student ability. Research was carried out by implementing evaluation tools to asses learning outcomes through early field trials and the second field trials. In addition, students‟ perceptions are collected through the questionnaire and teacher‟s perception through interview. Learning outcomes in both early and later field trials showed good results. There are 98% of students agreed with the application of the evaluation system. Lecturer stated that it‟s a practical system. Keywords: Performance assessment; evaluation tools; volleyball

  15. Automatic and objective assessment of alternating tapping performance in Parkinson's disease.

    Science.gov (United States)

    Memedi, Mevludin; Khan, Taha; Grenholm, Peter; Nyholm, Dag; Westin, Jerker

    2013-12-09

    This paper presents the development and evaluation of a method for enabling quantitative and automatic scoring of alternating tapping performance of patients with Parkinson's disease (PD). Ten healthy elderly subjects and 95 patients in different clinical stages of PD have utilized a touch-pad handheld computer to perform alternate tapping tests in their home environments. First, a neurologist used a web-based system to visually assess impairments in four tapping dimensions ('speed', 'accuracy', 'fatigue' and 'arrhythmia') and a global tapping severity (GTS). Second, tapping signals were processed with time series analysis and statistical methods to derive 24 quantitative parameters. Third, principal component analysis was used to reduce the dimensions of these parameters and to obtain scores for the four dimensions. Finally, a logistic regression classifier was trained using a 10-fold stratified cross-validation to map the reduced parameters to the corresponding visually assessed GTS scores. Results showed that the computed scores correlated well to visually assessed scores and were significantly different across Unified Parkinson's Disease Rating Scale scores of upper limb motor performance. In addition, they had good internal consistency, had good ability to discriminate between healthy elderly and patients in different disease stages, had good sensitivity to treatment interventions and could reflect the natural disease progression over time. In conclusion, the automatic method can be useful to objectively assess the tapping performance of PD patients and can be included in telemedicine tools for remote monitoring of tapping.

  16. Assessment Training Effects on Student Assessment Skills and Task Performance in a Technology-Facilitated Peer Assessment

    Science.gov (United States)

    Liu, Xiongyi; Li, Lan

    2014-01-01

    This study examines the impact of an assessment training module on student assessment skills and task performance in a technology-facilitated peer assessment. Seventy-eight undergraduate students participated in the study. The participants completed an assessment training exercise, prior to engaging in peer-assessment activities. During the…

  17. Performance of a thermal neutron radiographic system using imaging plates

    International Nuclear Information System (INIS)

    Silvani, Maria Ines; Almeida, Gevaldo L. de; Furieri, Rosanne; Lopes, Ricardo T.

    2009-01-01

    A performance evaluation of a neutron radiographic system equipped with a thermal neutron sensitive imaging plate has been undertaken. It includes the assessment of spatial resolution, linearity, dynamic range and the response to exposure time, as well as a comparison of these parameters with the equivalent ones for neutron radiography employing conventional films and a gadolinium foil as converter. The evaluation and comparison between the radiographic systems have been performed at the Instituto de Engenharia Nuclear - CNEN, using the Argonauta Reactor as source of thermal neutrons and a commercially available imaging plate reader. (author)

  18. Compilation and comparison of radionuclide sorption databases used in recent performance assessments

    International Nuclear Information System (INIS)

    McKinley, I.G.; Scholtis, A.

    1992-01-01

    The aim of this paper is to review the radionuclide sorption databases which have been used in performance assessments published within the last decade. It was hoped that such a review would allow areas of consistency to be identified, possibly indicating nuclide/rock/water systems which are now well characterised. Inconsistencies, on the other hand, might indicate areas in which further work is required. This study followed on from a prior review of the various databases which had been used in Swiss performance assessments. The latter was, however, considerably simplified by the fact that the authors had been heavily involved in sorption database definition for these assessments. The first phase of the current study was based entirely on available literature and it was quickly evident that the analyses would be much more complex (and time consuming) than initially envisaged. While some assessments clearly list all sorption data used, others depend on secondary literature (which may or may not be clearly referenced) or present sorption data which has been transmogrified into another form (e.g. into a retardation factor -c.f. following section). This study focused on database used (or intended) for performance assessment which have been published within the last 10 years or so. 45 refs., 12 tabs., 1 fig

  19. Parametric Approach to Assessing Performance of High-Lift Device Active Flow Control Architectures

    Directory of Open Access Journals (Sweden)

    Yu Cai

    2017-02-01

    Full Text Available Active Flow Control is at present an area of considerable research, with multiple potential aircraft applications. While the majority of research has focused on the performance of the actuators themselves, a system-level perspective is necessary to assess the viability of proposed solutions. This paper demonstrates such an approach, in which major system components are sized based on system flow and redundancy considerations, with the impacts linked directly to the mission performance of the aircraft. Considering the case of a large twin-aisle aircraft, four distinct active flow control architectures that facilitate the simplification of the high-lift mechanism are investigated using the demonstrated approach. The analysis indicates a very strong influence of system total mass flow requirement on architecture performance, both for a typical mission and also over the entire payload-range envelope of the aircraft.

  20. Life cycle integrated thermoeconomic assessment method for energy conversion systems

    International Nuclear Information System (INIS)

    Kanbur, Baris Burak; Xiang, Liming; Dubey, Swapnil; Choo, Fook Hoong; Duan, Fei

    2017-01-01

    Highlights: • A new LCA integrated thermoeconomic approach is presented. • The new unit fuel cost is found 4.8 times higher than the classic method. • The new defined parameter increased the sustainability index by 67.1%. • The case studies are performed for countries with different CO 2 prices. - Abstract: Life cycle assessment (LCA) based thermoeconomic modelling has been applied for the evaluation of energy conversion systems since it provided more comprehensive and applicable assessment criteria. This study proposes an improved thermoeconomic method, named as life cycle integrated thermoeconomic assessment (LCiTA), which combines the LCA based enviroeconomic parameters in the production steps of the system components and fuel with the conventional thermoeconomic method for the energy conversion systems. A micro-cogeneration system is investigated and analyzed with the LCiTA method, the comparative studies show that the unit cost of fuel by using the LCiTA method is 3.8 times higher than the conventional thermoeconomic model. It is also realized that the enviroeconomic parameters during the operation of the system components do not have significant impacts on the system streams since the exergetic parameters are dominant in the thermoeconomic calculations. Moreover, the improved sustainability index is found roundly 67.2% higher than the previously defined sustainability index, suggesting that the enviroeconomic and thermoeconomic parameters decrease the impact of the exergy destruction in the sustainability index definition. To find the feasible operation conditions for the micro-cogeneration system, different assessment strategies are presented. Furthermore, a case study for Singapore is conducted to see the impact of the forecasted carbon dioxide prices on the thermoeconomic performance of the micro-cogeneration system.

  1. Performance Assessment of a Post-Closure Pyrophoric Event

    International Nuclear Information System (INIS)

    Duguid, J.O.; Senger, R.K.; Leem, J.

    2002-01-01

    This paper describes analyses of a potential post-closure pyrophoric event in a waste package containing uranium metal spent fuel. The analyses include temperature at adjacent waste packages caused by the event and the dose to humans due to the event. The thermal analyses show that the event would not be expected to damage the adjacent waste packages. The dose analyses show that the doses due to the event are small. These analyses provide support to screening arguments used to demonstrate that the pyrophoric event should not be considered in the total system performance assessment model

  2. Performance assessment of grouted double-shell tank waste disposal at Hanford. Revision 1

    International Nuclear Information System (INIS)

    Shade, J.W., Kincaid, C.T.; Whyatt, G.A.; Rhoads, K.; Westsik, J.H. Jr.; Freshley, M.D.; Blanchard, K.A.; Shade, J.W.; Piepho, M.G.; Voogd, J.A.

    1994-09-01

    This document assesses the performance of the Grout Disposal Facility after closure. The facility and disposal environment are modeled to predict the long-term impacts of the disposal action. The document concludes that the disposal system provides reasonable assurance that doses to the public will remain within the performance objectives. This document is required for DOC Order 5820.2A

  3. Tools for the performance assessment and improvement of food safety management systems ; review

    NARCIS (Netherlands)

    Jacxsens, L.; Luning, P.A.; Marcelis, W.J.; Boekel, van M.A.J.S.; Rovira, J.; Oses Gomez, S.; Kousta, M.; Drosinos, E.H.; Jasson, V.; Uyttendaele, M.

    2011-01-01

    Food business operators are challenged to combine requirements from different stakeholders (e.g. government, retailers) into a company specific Food Safety Management System (FSMS). Tools to diagnose the performance of an implemented FSMS (diagnostic tools), tools to help a selection process

  4. Performance indicator system with application to NPP management

    International Nuclear Information System (INIS)

    Gomez, J.; Roldan, J.

    2001-01-01

    The objective of the paper is to present the work that is being conducted in the scope of a research project between Cofrentes NPP and the polytechnic university of Valencia aimed to the development and implementation of a performance indicators system to support plant management. In developing this system, attention is being paid to the areas of safety, production and dependability. The first step in the project was the development of the performance indicator system (PIS), in order to help in assessing the effectiveness of the different activities in plant (i.e. maintenance, inspections, tests, etc.). It is suggested establishing the operational indicators set in 3 levels. The lowest level concerns indicators monitoring performance and maintenance characteristics of components. The next one involves a subset of indicators placed at system level with a similar goal. And finally, the highest level summarizes the impact of the global policy in the whole plant from safety and performance point of view. The definition of an indicator should comprise, at least, the following items: indicator's name, performance area, definition and data needed. A strategy should define what, when and how indicators have to be evaluated, analyzed and reported. This article gives an example application of the methodology at the Cofrentes NPP, collective dose as safety indicator, power production as production indicator and the number of work orders as maintenance indicator are considered and their time evolution is given. (A.C.)

  5. Design concept of CSRAS (Cyber Security Risk Analysis and Assessment System) for digital I and C systems

    International Nuclear Information System (INIS)

    Song, J. G.; Lee, J. W.; Lee, D. Y.; Lee, C. K.

    2012-01-01

    The instrumentation and control (I and C) systems in nuclear power plants (NPPs) have been digitalized recently. Hence, cyber security becomes an important feature to be incorporated into the I and C systems. The Regulatory Guide 5.71 published by U.C NRC in 2010 presents a comprehensive set of security controls for the cyber security of I and C systems in NPPs. However, the application of security controls specified in the RG 5.71 in a specific I and C system still requires many analysis efforts based on the understanding of the security controls, since the guideline does not provide the details to system designers or developers regarding what, where, and how to apply the security controls. To apply security controls to I and C systems, cyber security requirements should be identified based on the cyber security policy and program, then the design and implementation of security controls should be performed along with the I and C system development life cycle. It can be assumed that cyber security requirements are identified during the system design(SD) phase and the design and implementation of security controls is performed during the component design(CD) phase. When identifying security requirements and performing the design and implementation of security controls, cyber security risk assessments should be processed with the understanding of the characteristics of target systems. In this study, the Cyber Security Risk Analysis and Assessment System (CSRAS) has been developed as a tool for analyzing security requirements and technical security controls considering based on a general cyber security risk assessment procedure with the consideration of the characteristics of I and C systems and the development phases

  6. Design concept of CSRAS (Cyber Security Risk Analysis and Assessment System) for digital I and C systems

    Energy Technology Data Exchange (ETDEWEB)

    Song, J. G.; Lee, J. W.; Lee, D. Y.; Lee, C. K. [KAERI, Daejeon (Korea, Republic of)

    2012-10-15

    The instrumentation and control (I and C) systems in nuclear power plants (NPPs) have been digitalized recently. Hence, cyber security becomes an important feature to be incorporated into the I and C systems. The Regulatory Guide 5.71 published by U.C NRC in 2010 presents a comprehensive set of security controls for the cyber security of I and C systems in NPPs. However, the application of security controls specified in the RG 5.71 in a specific I and C system still requires many analysis efforts based on the understanding of the security controls, since the guideline does not provide the details to system designers or developers regarding what, where, and how to apply the security controls. To apply security controls to I and C systems, cyber security requirements should be identified based on the cyber security policy and program, then the design and implementation of security controls should be performed along with the I and C system development life cycle. It can be assumed that cyber security requirements are identified during the system design(SD) phase and the design and implementation of security controls is performed during the component design(CD) phase. When identifying security requirements and performing the design and implementation of security controls, cyber security risk assessments should be processed with the understanding of the characteristics of target systems. In this study, the Cyber Security Risk Analysis and Assessment System (CSRAS) has been developed as a tool for analyzing security requirements and technical security controls considering based on a general cyber security risk assessment procedure with the consideration of the characteristics of I and C systems and the development phases.

  7. System impact research - increasing public health and health care system performance.

    Science.gov (United States)

    Malmivaara, Antti

    2016-01-01

    Interventions directed to system features of public health and health care should increase health and welfare of patients and population. To build a new framework for studies aiming to assess the impact of public health or health care system, and to consider the role of Randomized Controlled Trials (RCTs) and of Benchmarking Controlled Trials (BCTs). The new concept is partly based on the author's previous paper on the Benchmarking Controlled Trial. The validity and generalizability considerations were based on previous methodological studies on RCTs and BCTs. The new concept System Impact Research (SIR) covers all the studies which aim to assess the impact of the public health system or of the health care system on patients or on population. There are two kinds of studies in System Impact Research: Benchmarking Controlled Trials (observational) and Randomized Controlled Trials (experimental). The term impact covers in particular accessibility, quality, effectiveness, safety, efficiency, and equality. System Impact Research - creating the scientific basis for policy decision making - should be given a high priority in medical, public health and health economic research, and should also be used for improving performance. Leaders at all levels of health and social care can use the evidence from System Impact Research for the benefit of patients and population. Key messages The new concept of SIR is defined as a research field aiming at assessing the impacts on patients and on populations of features of public health and health and social care systems or of interventions trying to change these features. SIR covers all features of public health and health and social care system, and actions upon these features. The term impact refers to all effects caused by the public health and health and social care system or parts of it, with particular emphasis on accessibility, quality, effectiveness, adverse effects, efficiency, and equality of services. SIR creates the

  8. Evaluation of the Trade Space Between UAS Maneuver Performance and SAA System Performance Requirements

    Science.gov (United States)

    Jack, Devin P.; Hoffler, Keith D.; Johnson, Sally C.

    2014-01-01

    A need exists to safely integrate Unmanned Aircraft Systems (UAS) into the National Airspace System. Replacing manned aircraft's see-and-avoid capability in the absence of an onboard pilot is one of the key challenges associated with safe integration. Sense-and-avoid (SAA) systems will have to achieve yet-to-be-determined required separation distances for a wide range of encounters. They will also need to account for the maneuver performance of the UAS they are paired with. The work described in this paper is aimed at developing an understanding of the trade space between UAS maneuver performance and SAA system performance requirements. An assessment of current manned and unmanned aircraft performance was used to establish potential UAS performance test matrix bounds. Then, nearterm UAS integration work was used to narrow down the scope. A simulator was developed with sufficient fidelity to assess SAA system performance requirements for a wide range of encounters. The simulator generates closest-point-of-approach (CPA) data from the wide range of UAS performance models maneuvering against a single intruder with various encounter geometries. The simulator is described herein and has both a graphical user interface and batch interface to support detailed analysis of individual UAS encounters and macro analysis of a very large set of UAS and encounter models, respectively. Results from the simulator using approximate performance data from a well-known manned aircraft is presented to provide insight into the problem and as verification and validation of the simulator. Analysis of climb, descent, and level turn maneuvers to avoid a collision is presented. Noting the diversity of backgrounds in the UAS community, a description of the UAS aerodynamic and propulsive design and performance parameters is included. Initial attempts to model the results made it clear that developing maneuver performance groups is required. Discussion of the performance groups developed and how

  9. Historical Background on Assessment the Performance of the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    Rechard, R.P.

    1999-06-01

    In 1979, six years after selecting the Delaware Basin as a potential disposal area, Congress authorized the US Department of Energy to build the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, as a research and development facility for the safe management, storage, and disposal of waste contaminated with transuranic radioisotopes. In 1998, 19 years after authorization and 25 years after site selection, the US Environmental Protection Agency (EPA) certified that the WIPP disposal system complied with its regulations. The EPA's decision was primarily based on the results from a performance assessment conducted in 1996. This performance assessment was the culmination of four preliminary performance assessments conducted between 1989 and 1992. This report provides a historical setting and context for how the performance of the deep geologic repository at the WIPP was analyzed. Also included is background on political forces acting on the project. For example, the federal requirement to provide environmental impact statements and negotiated agreements with the State of New Mexico influenced the type of scientific areas that were investigated and the engineering analysis prior to 1989 for the WIPP.

  10. Assessment of Literature Related to Combustion Appliance Venting Systems

    Energy Technology Data Exchange (ETDEWEB)

    Rapp, Vi H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Singer, Brett C. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Stratton, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wray, Craig P. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-06-01

    In many residential building retrofit programs, air tightening to increase energy efficiency is constrained by concerns about related impacts on the safety of naturally vented combustion appliances. Tighter housing units more readily depressurize when exhaust equipment is operated, making combustion appliances more prone to backdraft or spillage. Several test methods purportedly assess the potential for depressurization-induced backdrafting and spillage, but these tests are not robustly reliable and repeatable predictors of venting performance, in part because they do not fully capture weather effects on venting performance. The purpose of this literature review is to investigate combustion safety diagnostics in existing codes, standards, and guidelines related to combustion appliances. This review summarizes existing combustion safety test methods, evaluations of these test methods, and also discusses research related to wind effects and the simulation of vent system performance. Current codes and standards related to combustion appliance installation provide little information on assessing backdrafting or spillage potential. A substantial amount of research has been conducted to assess combustion appliance backdrafting and spillage test methods, but primarily focuses on comparing short-term (stress) induced tests and monitoring results. Monitoring, typically performed over one week, indicated that combinations of environmental and house operation characteristics most conducive to combustion spillage were rare. Research, to an extent, has assessed existing combustion safety diagnostics for house depressurization, but the objectives of the diagnostics, both stress and monitoring, are not clearly defined. More research is also needed to quantify the frequency of test “failure” occurrence throughout the building stock and assess the statistical effects of weather (especially wind) on house depressurization and in turn on combustion appliance venting

  11. Approach to modeling of human performance for purposes of probabilistic risk assessment

    International Nuclear Information System (INIS)

    Swain, A.D.

    1983-01-01

    This paper describes the general approach taken in NUREG/CR-1278 to model human performance in sufficienct detail to permit probabilistic risk assessments of nuclear power plant operations. To show the basis for the more specific models in the above NUREG, a simplified model of the human component in man-machine systems is presented, the role of performance shaping factors is discussed, and special problems in modeling the cognitive aspect of behavior are described

  12. Wind diesel systems - design assessment and future potential

    DEFF Research Database (Denmark)

    Infield, D.G.; Scotney, A.; Lundsager, P.

    1992-01-01

    Diesels are the obvious form. of back-up electricity generation in small to medium sized wind systems. High wind penetrations pose significant technical problems for the system designer, ranging from component sizing to control specification and dynamic stability. A key role is seen for proven...... system models for assessing both dynamic characteristics and overall performance and economics. An introduction is provided to the Wind Diesel Engineering Design Toolkit currently under development (for implementation on PC) by a consortium of leading wind diesel experts, representing six European...

  13. Assessment of three risk evaluation systems for patients aged ≥70 in East China: performance of SinoSCORE, EuroSCORE II and the STS risk evaluation system.

    Science.gov (United States)

    Shan, Lingtong; Ge, Wen; Pu, Yiwei; Cheng, Hong; Cang, Zhengqiang; Zhang, Xing; Li, Qifan; Xu, Anyang; Wang, Qi; Gu, Chang; Zhang, Yangyang

    2018-01-01

    To assess and compare the predictive ability of three risk evaluation systems (SinoSCORE, EuroSCORE II and the STS risk evaluation system) in patients aged ≥70, and who underwent coronary artery bypass grafting (CABG) in East China. Three risk evaluation systems were applied to 1,946 consecutive patients who underwent isolated CABG from January 2004 to September 2016 in two hospitals. Patients were divided into two subsets according to their age: elderly group (age ≥70) with a younger group (age evaluation system were 0.78(0.64)%, 1.43(1.14)% and 0.78(0.77)%, respectively. SinoSCORE achieved the best discrimination (the area under the receiver operating characteristic curve (AUC) = 0.829), followed by the STS risk evaluation system (AUC = 0.790) and EuroSCORE II (AUC = 0.769) in the entire cohort. In the elderly group, the observed mortality rate was 4.82% while it was 1.38% in the younger group. SinoSCORE (AUC = .829) also achieved the best discrimination in the elderly group, followed by the STS risk evaluation system (AUC = .730) and EuroSCORE II (AUC = 0.640) while all three risk evaluation systems all had good performances in the younger group. SinoSCORE, EuroSCORE II and the STS risk evaluation system all achieved positive calibrations in the entire cohort and subsets. The performance of the three risk evaluation systems was not ideal in the entire cohort. In the elderly group, SinoSCORE appeared to achieve better predictive efficiency than EuroSCORE II and the STS risk evaluation system.

  14. Thermodynamics, data estimation and performance assessment

    International Nuclear Information System (INIS)

    Grenthe, I.

    2002-01-01

    Performance assessment provides a narrative of a system and its development. One may use a literary metaphor; the procedure is like writing a novel where the 'chapters' are the various sub-systems and where both the 'plot' and the 'grammar' are based on scientific and other information, some hard facts and other more or less reliable guesses. I will begin with some general remarks on models, which may provide a useful starting point for what follows. - Models never provide complete descriptions of real systems; they are used to highlight certain aspects of them and to answer 'what-if' questions; - Modelling is an iterative process that provides guidance as to what are important phenomena and what is less relevant for the description of the system and its function; - It is necessary to distinguish between model uncertainties and parameter uncertainties; - It is often better to estimate a quantity for which no data are available than to exclude the particular process where it is needed. Thermodynamics provide not only numerical values for different chemical processes, but more important a theory framework that can be used for the estimation of data. I will not discuss activity coefficient corrections of thermodynamic data, an important area that has already been addressed by Professor Fanghaenel. In the following overview I will be using examples of estimations of different kinds to illustrate what can be accomplished using thermodynamics in combination with chemical theories. (author)

  15. Reliability assessment of complex electromechanical systems under epistemic uncertainty

    International Nuclear Information System (INIS)

    Mi, Jinhua; Li, Yan-Feng; Yang, Yuan-Jian; Peng, Weiwen; Huang, Hong-Zhong

    2016-01-01

    The appearance of macro-engineering and mega-project have led to the increasing complexity of modern electromechanical systems (EMSs). The complexity of the system structure and failure mechanism makes it more difficult for reliability assessment of these systems. Uncertainty, dynamic and nonlinearity characteristics always exist in engineering systems due to the complexity introduced by the changing environments, lack of data and random interference. This paper presents a comprehensive study on the reliability assessment of complex systems. In view of the dynamic characteristics within the system, it makes use of the advantages of the dynamic fault tree (DFT) for characterizing system behaviors. The lifetime of system units can be expressed as bounded closed intervals by incorporating field failures, test data and design expertize. Then the coefficient of variation (COV) method is employed to estimate the parameters of life distributions. An extended probability-box (P-Box) is proposed to convey the present of epistemic uncertainty induced by the incomplete information about the data. By mapping the DFT into an equivalent Bayesian network (BN), relevant reliability parameters and indexes have been calculated. Furthermore, the Monte Carlo (MC) simulation method is utilized to compute the DFT model with consideration of system replacement policy. The results show that this integrated approach is more flexible and effective for assessing the reliability of complex dynamic systems. - Highlights: • A comprehensive study on the reliability assessment of complex system is presented. • An extended probability-box is proposed to convey the present of epistemic uncertainty. • The dynamic fault tree model is built. • Bayesian network and Monte Carlo simulation methods are used. • The reliability assessment of a complex electromechanical system is performed.

  16. Analysis and performance assessment of a multigenerational system powered by Organic Rankine Cycle for a net zero energy house

    International Nuclear Information System (INIS)

    Hassoun, Anwar; Dincer, Ibrahim

    2015-01-01

    This paper develops a new Organic Rankine Cycle (ORC) based multigenerational system to meet the demands of a net zero energy building and assesses such a system for an application to a net zero energy house in Lebanon. Solar energy is the prime source for the integrated system to achieve multigeneration to supply electricity, fresh and hot water, seasonal heating and cooling. The study starts by optimizing the power system with and without grid connection. Then, a comprehensive thermodynamic analysis through energy and exergy, and a parametric study to assess the sensitivity and improvements of the overall system are conducted. Furthermore, exergoeconomic analysis and a follow-up optimization study for optimizing the total system cost to the overall system efficiency using genetic algorithm to obtain the optimal design or a set of optimal designs (Pareto Front), are carried out. The present results show that the optimum solar energy system for a total connected load to the house of 90 kWh/day using a combination of ORC, batteries, convertor has a total net present cost of US $52,505.00 (based on the prices in 2013) with a renewable energy fraction of 1. Moreover, the optimization for the same connected load with ORC, batteries and converter configuration with grid connection results in a total net present cost of $50,868.00 (2013) with a renewable energy fraction of 0.992 with 169 kg/yr of CO 2 emissions. In addition, exergoeconomic analysis of the overall system yields a cost of $117,700.00 (2013), and the multi-objective optimization provides the overall exergetic efficiency by 14% at a total system cost increase of $10,500.00 (2013). - Highlights: • To develop a new Organic Rankine Cycle (ORC) based multigenerational system to meet the demands of a net zero energy building. • To perform a comprehensive thermodynamic analysis through energy and exergy approaches. • To apply an exergoeconomic model for exergy-based cost accounting. • To undertake

  17. Assessment in Open and Distance Learning System (ODL: A Challenge

    Directory of Open Access Journals (Sweden)

    S. V. S. Chaudhary

    2013-09-01

    Full Text Available Assessment is an integral part of the learning process. The traditional practice of assessment has changed to meet the need of the contemporary society. In this paper assessment strategies used in Open and Distance Education are discussed and constructive suggestions are given to meet the challenges of assessment. Recently we experience a paradigm shift in assessment both in face-to-face and ODL system. Content-based testing has shifted to performance-based assessment. Assessment is no longer used for grading and certification, rather it has linked with learning and skill development of the students. Instead of a single paper pencil test, a variety of techniques and methods are being increasingly conducted. In this context assessment in the ODL system has adopted a new shape to provide better assessment judgments to its students and at the same time helping teachers and administrators. Coping with the changing scenario in ODL we face challenges addressed extensively in this article.

  18. Contaminant fluxes through site containment barriers: Performance assessment and illustrative results

    International Nuclear Information System (INIS)

    Vita, C.L.

    1994-01-01

    Contaminant mass flux by advective and diffusive transport is predicted for five containment barriers that use one or more clay liners, flexible membrane liners (FMLs), or liquid collection and removal systems (LCRS)s. Barriers are engineered systems intended to contain and isolate site contaminants from the environment. Barriers include liners, caps, and cutoff walls. Barriers may be used in contaminated-site cleanups (including CERCLA and RCRA), RCRA landfills, or other RCRA TSDFs. Concepts are provided for barrier performance assessment, including analysis and optimization, for meeting performance requirements and controlling risk at minimum cost. Concepts and results can help in planning, designing, or evaluating and communicating, the use or effectiveness of proposed or existing barriers for site cleanups or waste containment. 15 refs., 6 figs., 5 tabs

  19. Supplier Performance Evaluation and Rating System (SPEARS)

    International Nuclear Information System (INIS)

    Oged, M.; Warner, D.; Gurbuz, E.

    1993-03-01

    The SSCL Magnet Quality Assurance Department has implemented a Supplier Performance Evaluation and Rating System (SPEARS) to assess supplier performance throughout the development and production stages of the SSCL program. The main objectives of SPEARS are to promote teamwork and recognize performance. This paper examines the current implementation of SPEARS. MSD QA supports the development and production of SSCsuperconducting magnets while implementing the requirements of DOE Order 5700.6C. The MSD QA program is based on the concept of continuous improvement in quality and productivity. The QA program requires that procurement of items and services be controlled to assure conformance to specification. SPEARS has been implemented to meet DOE requirements and to enhance overall confidence in supplier performance. Key elements of SPEARS include supplier evaluation and selection as well as evaluation of furnished quality through source inspection, audit, and receipt inspection. These elements are described in this paper

  20. Supplier Performance Evaluation and Rating System (SPEARS)

    International Nuclear Information System (INIS)

    Oged, M.; Warner, D.G.; Gurbuz, E.

    1994-01-01

    The SSCL Magnet Quality Assurance Department has implemented a Supplier Performance Evaluation and Rating System (SPEARS) to assess supplier performance throughout the development and production stages of the SSCL program. The main objectives of SPEARS are to promote teamwork and recognize performance. This paper examines the current implementation of SPEARS. MSD QA supports the development and production of SSC superconducting magnets while implementing the requirements of DOE Order 5700.6C. The MSD QA program is based on the concept of continuous improvement in quality and productivity. The QA program requires that procurement of items and services be controlled to assure conformance to specification. SPEARS has been implemented to meet DOE requirements and to enhance overall confidence in supplier performance. Key elements of SPEARS include supplier evaluation and selection as well as evaluation of furnished quality through source inspection, audit, and receipt inspection. These elements are described in this paper

  1. 1998 interim 242-A Evaporator tank system integrity assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, C.E.

    1998-07-02

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ``dangerous waste storage or treatment tank and its ancillary equipment and containment.`` This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD.

  2. 1998 interim 242-A Evaporator tank system integrity assessment report

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1998-01-01

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ''dangerous waste storage or treatment tank and its ancillary equipment and containment.'' This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD

  3. The influence of system quality characteristics on health care providers' performance: Empirical evidence from Malaysia.

    Science.gov (United States)

    Mohd Salleh, Mohd Idzwan; Zakaria, Nasriah; Abdullah, Rosni

    The Ministry of Health Malaysia initiated the total hospital information system (THIS) as the first national electronic health record system for use in selected public hospitals across the country. Since its implementation 15 years ago, there has been the critical requirement for a systematic evaluation to assess its effectiveness in coping with the current system, task complexity, and rapid technological changes. The study aims to assess system quality factors to predict the performance of electronic health in a single public hospital in Malaysia. Non-probability sampling was employed for data collection among selected providers in a single hospital for two months. Data cleaning and bias checking were performed before final analysis in partial least squares-structural equation modeling. Convergent and discriminant validity assessments were satisfied the required criterions in the reflective measurement model. The structural model output revealed that the proposed adequate infrastructure, system interoperability, security control, and system compatibility were the significant predictors, where system compatibility became the most critical characteristic to influence an individual health care provider's performance. The previous DeLone and McLean information system success models should be extended to incorporate these technological factors in the medical system research domain to examine the effectiveness of modern electronic health record systems. In this study, care providers' performance was expected when the system usage fits with patients' needs that eventually increased their productivity. Copyright © 2016 King Saud Bin Abdulaziz University for Health Sciences. Published by Elsevier Ltd. All rights reserved.

  4. Technical and economic performance of integrated bioenergy systems

    Energy Technology Data Exchange (ETDEWEB)

    Toft, A.J.; Bridgwater, A.V. [Aston Univ. (United Kingdom). Energy Research Group; Mitchell, C.P.; Watters, M.P. [Aberdeen Univ. (United Kingdom). Wood Supply Research Group; Stevens, D.J. [Cascade Research, Inc. (United States)

    1996-12-31

    A comprehensive study of biomass production, conversion and utilisation systems has been carried out to examine complete bioenergy systems from biomass in the forest to electricity delivered to the grid. Spreadsheet models have been derived for all of the key steps in an integrated process and these have been compiled into an overall BioEnergy Assessment Model (BEAM). The model has also been used to investigate both the performance of different technologies and the effect of different configurations of the same basic system by manipulating the interfaces between feed production, feed conversion and electricity generation. Some of the results of these analyses are presented here. (orig.)

  5. Technical and economic performance of integrated bioenergy systems

    Energy Technology Data Exchange (ETDEWEB)

    Toft, A J; Bridgwater, A V [Aston Univ. (United Kingdom). Energy Research Group; Mitchell, C P; Watters, M P [Aberdeen Univ. (United Kingdom). Wood Supply Research Group; Stevens, D J [Cascade Research, Inc. (United States)

    1997-12-31

    A comprehensive study of biomass production, conversion and utilisation systems has been carried out to examine complete bioenergy systems from biomass in the forest to electricity delivered to the grid. Spreadsheet models have been derived for all of the key steps in an integrated process and these have been compiled into an overall BioEnergy Assessment Model (BEAM). The model has also been used to investigate both the performance of different technologies and the effect of different configurations of the same basic system by manipulating the interfaces between feed production, feed conversion and electricity generation. Some of the results of these analyses are presented here. (orig.)

  6. Technical and economic performance of integrated bioenergy systems

    International Nuclear Information System (INIS)

    Toft, A.J.; Bridgwater, A.V.

    1996-01-01

    A comprehensive study of biomass production, conversion and utilisation systems has been carried out to examine complete bioenergy systems from biomass in the forest to electricity delivered to the grid. Spreadsheet models have been derived for all of the key steps in an integrated process and these have been compiled into an overall BioEnergy Assessment Model (BEAM). The model has also been used to investigate both the performance of different technologies and the effect of different configurations of the same basic system by manipulating the interfaces between feed production, feed conversion and electricity generation. Some of the results of these analyses are presented here. (orig.)

  7. Assessment and improvement of the Italian healthcare system: first evidence from a pilot national performance evaluation system.

    Science.gov (United States)

    Nuti, Sabina; Seghieri, Chiara; Vainieri, Milena; Zett, Silvia

    2012-01-01

    The Italian National Health System (NHS), established in 1978, follows a model similar to the Beveridge model developed by the British NHS (Beveridge 1942; Musgrove 2000). Like the British NHS, healthcare coverage for the Italian population is provided and financed by the government through taxes. Universal coverage provides uniform healthcare access to citizens and is the characteristic usually considered the added value of a welfare system financed by tax revenues. Nonetheless, in Italy the strong policy of decentralization, which has been taking place since the early 1990s, has gradually shifted powers from the state to the 21 Italian regions. Consequently, the state now retains limited supervisory control and continues to have overall responsibility for the NHS in order to ensure uniform and essential levels of health services across the country. In this context, it has become essential, both for the ministry and for regions, to adopt a common performance evaluation system (PES). This article reports the definition, implementation, and first evidences of a pilot PES at a national level. It shows how this PES can be viewed as a strategic tool supporting the Ministry of Health (MoH) in ensuring uniform levels of care for the population and assisting regional managers to evaluate performance in benchmarking. Finally, lessons for other health systems, based on the Italian experience, are provided.

  8. Environmental performance assessment of Napier grass for bioenergy production

    DEFF Research Database (Denmark)

    Nimmanterdwong, Prathana; Chalermsinsuwan, Benjapon; Østergård, Hanne

    2017-01-01

    equivalence. This idea provides the quantitative indicators involving the resource use and the percent renewability of the systems. For the proposed biorefinery model, Napier grass (Pennisetum purpureum) grown in Thailand was used as lignocellulosic feedstock. An emergy assessment was performed in two parts...... cultivation and biorefinery stages. For Napier grass cultivation, most of the emergy support came from local resources in term of evapotranspiration of Napier grass (33%) and the diesel consumption during the cultivation process (21%). The emergy sustainability indicator of the cultivation was 0...

  9. Comparative Assessment of Health Workers Performance and The ...

    African Journals Online (AJOL)

    Comparative Assessment of Health Workers Performance and The Performance ... had very high significant effect on performance of health workers which was independent of ... Keywords: Health Worker Performance Factors Hospitals Nigeria ...

  10. Methodology for NDA performance assessment

    International Nuclear Information System (INIS)

    Cuypers, M.; Franklin, M.; Guardini, S.

    1986-01-01

    In the framework of the RandD programme of the Joint Research Centre of the Commission of the European Communities, a considerable effort is being dedicated to performance assessment of NDA techniques taking account of field conditions. By taking account of field conditions is meant measurement samples of the size encountered in practice and training which allows inspectors to design cost efficient verification plans for the real situations encountered in the field. Special laboratory facilities referred to as PERLA are being constructed for this purpose. These facilities will be used for measurement experiments and for training. In this paper, performance assessment is discussed under the headings of measurement capability and in-field effectiveness. Considerable emphasis is given to the role of method specific measurement error models. The authors outline the advantages of giving statistical error models a sounder basis in the physical phenomenology of the measurement method

  11. A performance assessment methodology for low-level radioactive waste disposal

    International Nuclear Information System (INIS)

    Deering, L.R.; Kozak, M.W.

    1990-01-01

    To demonstrate compliance with the performance objectives governing protection of the general population in 10 CFR 61.41, applicants for land disposal of low-level radioactive waste are required to conduct a pathways analysis, or quantitative evaluation of radionuclide release, transport through environmental media, and dose to man. The Nuclear Regulatory Commission staff defined a strategy and initiated a project at Sandia National Laboratories to develop a methodology for independently evaluating an applicant's analysis of postclosure performance. This performance assessment methodology was developed in five stages: (1) identification of environmental pathways, (2) ranking, the significance of the pathways, (3) identification and integration of models for pathway analyses, (4) identification and selection of computer codes and techniques for the methodology, and (5) implementation of the codes and documentation of the methodology. The final methodology implements analytical and simple numerical solutions for source term, ground-water flow and transport, surface water transport, air transport, food chain, and dosimetry analyses, as well as more complex numerical solutions for multidimensional or transient analyses when more detailed assessments are needed. The capability to perform both simple and complex analyses is accomplished through modular modeling, which permits substitution of various models and codes to analyze system components

  12. Food safety management systems performance in the lamb production chain

    NARCIS (Netherlands)

    Oses, S.M.; Luning, P.A.; Jacxsens, L.; Jaime, I.; Rovira, J.

    2012-01-01

    This study describes a performance measurement of implemented food safety management system (FSMS) along the lamb chain using an FSMS-diagnostic instrument (FSMS-DI) and a Microbiological Assessment Scheme (MAS). Three slaughterhouses, 1 processing plant and 5 butcher shops were evaluated. All the

  13. Current perspectives on performance assessment at the NRC

    International Nuclear Information System (INIS)

    Coplan, S.M.; Eisenberg, N.A.; Federline, M.V.; Randall, J.D.

    1992-01-01

    The Nuclear Regulatory Commission (NRC) staff is engaging in a number of activities involving performance assessment in order to support NRC's program in high-level waste management. Broad areas of activity include: (1) reactive work responding to products and activities of the Department of Energy (DOE), (2) proactive work, including development of an independent performance assessment capability, development of guidance for DOE, support for technical and programmatic integration, (3) a program of regulatory research, and (4) participation in a number of international activities. As the U.S. high-level waste program continues to mature, performance assessment is seen as playing a more prominent role in evaluating safety and focussing technical activities

  14. A sustainability assessment system for Chinese iron and steel firms

    DEFF Research Database (Denmark)

    Long, Yunguang; Pan, Jieyi; Farooq, Sami

    2016-01-01

    from financial and sustainability reports of four leading Chinese iron and steel firms. The proposed sustainable assessment system is envisaged to help Chinese iron and steel firms to objectively investigate their sustainability performance, provide clear and effective information to decision makers......The environmental impact of the Chinese iron and steel industry is huge due to its high consumption of ore, coal and energy, and water and air pollution. It is important not only for China but also for the rest of the world that the Chinese iron and steel industry becomes more sustainable....... A sustainable assessment indicator system is an important tool to support that development. Currently, however, a sustainable assessment system, specifically designed to match the characteristics of Chinese iron and steel firms, is not available. In this paper such a system is proposed and evaluated using data...

  15. Some viewpoints on reference biospheres in Finnish performance assessments

    International Nuclear Information System (INIS)

    Rasilainen, K.; Kattilakoski, E.; Suolanen, V.; Vieno, T.; Vuori, S.

    2002-01-01

    Viewpoints are presented concerning biosphere studies in performance assessments of nuclear waste disposal. The points are based on experiences from several Finnish performance assessments. The latest performance assessment for spent fuel disposal, TILA-99, was considered in the Decision in Principle process for the site selection of the repository. The points given are also based on experiences from participation in international projects dealing with biosphere modelling, for instance BIOMOVS and BIOMASS. (author)

  16. Information System Quality Assessment Methods

    OpenAIRE

    Korn, Alexandra

    2014-01-01

    This thesis explores challenging topic of information system quality assessment and mainly process assessment. In this work the term Information System Quality is defined as well as different approaches in a quality definition for different domains of information systems are outlined. Main methods of process assessment are overviewed and their relationships are described. Process assessment methods are divided into two categories: ISO standards and best practices. The main objective of this w...

  17. 291-B-1 stack monitoring and sampling system annual system assessment report

    International Nuclear Information System (INIS)

    Ridge, T.M.

    1994-01-01

    The B Plant 291-B-1 main stack exhausts gaseous effluents to the atmosphere from the 221-B Building canyon and cells, the No. 1 Vessel Ventilation System (VVS1), the 212-B Cask Station cell ventilation system, and, to a limited capacity, the 224-B Building. VVS1 collects offgases from various process tanks in 221-B Building, while the 224-B system maintains a negative pressure in out-of-service, sealed process tanks. B Plant Administration Manual, WHC-CM-7-5, Section 5.30 requires an annual system assessment to evaluate and report the present condition of the sampling and monitoring system associated with Stack 291-B-1 (System Number B977A) at B Plant. The system is functional and performing satisfactorily

  18. Measurement control design and performance assessment in the Integral Fast Reactor fuel cycle

    International Nuclear Information System (INIS)

    Orechwa, Y.; Bucher, R.G.

    1994-01-01

    The Integral Fast Reactor (IFR)--consisting of a metal fueled and liquid metal cooled reactor together with an attendant fuel cycle facility (FCF)--is currently undergoing a phased demonstration of the closed fuel cycle at Argonne National Laboratory. The recycle technology is pyrometalurgical based with incomplete fission product separation and all transuranics following plutonium for recycle. The equipment operates in batch mode at 500 to 1,300 C. The materials are highly radioactive and pyrophoric, thus the FCF requires remote operation. Central to the material control and accounting system for the FCF are the balances for mass measurements. The remote operation of the balances limits direct adjustment. The radiation environment requires that removal and replacement of the balances be minimized. The uniqueness of the facility precludes historical data for design and performance assessment. To assure efficient operation of the facility, the design of the measurement control system has called for procedures which assess the performance of the balances in great detail and will support capabilities for the correction of systematic changes in the performance of the balances through software

  19. The link between performance assessment and quality of data

    International Nuclear Information System (INIS)

    Csullog, G.W.

    1990-11-01

    Performance assessments, using both individual and cumulative inventories, produce estimates of the risk or dose consequences for repository concepts. Unacceptable risk or dose for a given contaminant identify it as a problem contaminant. While risk or dose consequences are common outputs of safety assessments, results can also be reported as estimates of the safe inventory limit for each contaminant in a repository scenario. Once problem contaminants are identified, it may be useful to: validate the data used in the performance assessment; restrict contaminant inventories in the repository; or, improve the containment capability of the repository (including improved packaging). A key point is that performance assessments define the quality of data to be collected. If a contaminant's inventory will be far below its estimated safe inventory limit for a repository, then it is reasonable to accept inventory estimates that have high variances and low confidence. For contaminants that have a significant impact upon performance assessments, efforts must be made to provide the best inventory (source term) estimates practicable. One important goal of characterization programs should be to establish the adequacy of data used in performance assessments. There is little value in striving to improve confidence in data for some waste streams if they are assessed to have a minor impact upon repository performance. Streams that have a major impact upon performance deserve the time, attention and money to be characterized adequately. Waste acceptance must be linked to the quality of characterization data provided by generators. This link sets compliance monitoring requirements

  20. Some concepts of model uncertainty for performance assessments of nuclear waste repositories

    International Nuclear Information System (INIS)

    Eisenberg, N.A.; Sagar, B.; Wittmeyer, G.W.

    1994-01-01

    Models of the performance of nuclear waste repositories will be central to making regulatory decisions regarding the safety of such facilities. The conceptual model of repository performance is represented by mathematical relationships, which are usually implemented as one or more computer codes. A geologic system may allow many conceptual models, which are consistent with the observations. These conceptual models may or may not have the same mathematical representation. Experiences in modeling the performance of a waste repository representation. Experiences in modeling the performance of a waste repository (which is, in part, a geologic system), show that this non-uniqueness of conceptual models is a significant source of model uncertainty. At the same time, each conceptual model has its own set of parameters and usually, it is not be possible to completely separate model uncertainty from parameter uncertainty for the repository system. Issues related to the origin of model uncertainty, its relation to parameter uncertainty, and its incorporation in safety assessments are discussed from a broad regulatory perspective. An extended example in which these issues are explored numerically is also provided