WorldWideScience

Sample records for area integrated projects

  1. Salt Lake City Area Integrated Projects: Rate adjustment: Environmental assessment

    International Nuclear Information System (INIS)

    The Department of Energy (DOE) has determined that the proposed firm power rate increase for the Salt Lake City Area Integrated Projects (Integrated Projects) power would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA, 42 USC 4321, et seq.) and, as such, does not require the preparation of an environmental impact statement (EIS). This determination is based on an environmental assessment (EA) prepared by the Western Area Power Administration (Western) dated August 1990 (DOE/EA-0457). The EA identifies and evaluates the potential environmental and socioeconomic effects of the proposed action, and based on the analysis contained therein, DOE concludes that the impacts to the human environment resulting from the implementation of the rate increase would be insignificant

  2. Sensor Area Network for Integrated Systems Health Management Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The term Integrated Systems Health Management (ISHM) is used to describe a capability that focuses on determining the condition (health) of every element in a...

  3. Sensor Area Network for Integrated Systems Health Management Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The term Integrated Systems Health Management (ISHM) is used to describe a capability that focuses on determining the condition of every element in a complex System...

  4. Integrated Project Management: A Case Study in Integrating Cost, Schedule, Technical, and Risk Areas

    Science.gov (United States)

    Smith, Greg

    2004-01-01

    This viewgraph presentation describes a case study as a model for integrated project management. The ISS Program Office (ISSPO) developed replacement fluid filtration cartridges in house for the International Space Station (ISS). The presentation includes a step-by-step procedure and organizational charts for how the fluid filtration problem was approached.

  5. The 300 Area Integrated Field Research Challenge Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2009-04-29

    Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the 300 Area IFRC Project. This plan is designed to be used exclusively by project staff.

  6. First stage of INTRAMAP: INtegrated Transantarctic Mountains and Ross Sea Area Magnetic Anomaly Project

    Directory of Open Access Journals (Sweden)

    D. Damaske

    1999-06-01

    Full Text Available INTRAMAP (INtegrated Transantarctic Mountains and Ross Sea Area Magnetic Anomaly Project is an international effort to merge the magnetic data acquired throughout the "Ross Sea Antarctic Sector" (south of 60°S between 135°-255°E including the Transantarctic Mountains (TAM, the Ross Sea, Marie Byrd Land, and the Pacific coast, and also to begin the compilation efforts for new data over the Wilkes Basin. This project is a component of the continental scale Antarctic Digital Magnetic Anomaly Project (ADMAP. The first stage of INTRAMAP addresses the analysis and merging of GITARA (1991-1994 and GANOVEX (1984 aeromagnetic surveys together with ground magnetic data (1984-1989. The combined data sets cover an area of approximately 30 km2 over Victoria Land and adjacent Ross Sea. Map and profile gridding were implemented to integrate the data sets. These approaches are studied for improving existing strategies to adopt for the whole magnetic compilation effort. The final microlevelled grid that we produce is a new tool for regional interpretation of the main tectonic and geologic features of this sector of Antarctica.

  7. Optimizing hourly hydro operations at the Salt Lake City Area integrated projects

    International Nuclear Information System (INIS)

    The Salt Lake City Area (SLCA) office of the Western Area Power Administration (Western) is responsible for marketing the capacity and energy generated by the Colorado Storage, Collbran, and Rio Grande hydropower projects. These federal resources are collectively called the Salt Lake City Area Integrated Projects (SLCA/IP). In recent years, stringent operational limitations have been placed on several of these hydropower plants including the Glen Canyon Dam, which accounts for approximately 80% of the SLCA/IP resources. Operational limitations on SLCA/IP hydropower plants continue to evolve as a result of decisions currently being made in the Glen Canyon Dam Environmental Impact Statement (EIS) and the Power Marketing EIS. To analyze a broad range of issues associated with many possible future operational restrictions, Argonne National Laboratory (ANL), with technical assistance from Western has developed the Hydro LP (Linear Program) Model. This model simulates hourly operations at SLCA/IP hydropower plants for weekly periods with the objective of maximizing Western's net revenues. The model considers hydropower operations for the purpose of serving SLCA firm loads, loads for special projects, Inland Power Pool (IPP) spinning reserve requirements, and Western's purchasing programs. The model estimates hourly SLCA/IP generation and spot market activities. For this paper, hourly SLCA/IP hydropower plant generation is simulated under three operational scenarios and three hydropower conditions. For each scenario an estimate of Western's net revenue is computed

  8. Integrated Lake Management Project

    OpenAIRE

    Goverment of Uganda; Department for International Development (DFID) of the UK Government

    2007-01-01

    In 1999, the Integrated Co-management of Lakes through Beach Management Units project was started in an effort to implement a new approach to the management of lake resources in Uganda. The main components of this plan involved decentralization, local community management, and improving the livelihood of the poor. In order to finance the management of these areas, the Beach Management Units (BMU's) are charging user fees to those individuals who obtain benefit from the natural resources. Thes...

  9. Highly Integrated, Reconfigurable, Large-Area, Flexible Radar Antenna Arrays Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Highly-integrated, reconfigurable radar antenna arrays fabricated on flexible substrates offer high functionality in a portable package that can be rolled up and...

  10. Class 1 overview of cultural resources for the Western Area Power Administration Salt Lake City Area Integrated Projects electric power marketing environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    Moeller, K.L.; Malinowski, L.M.; Hoffecker, J.F.; Walitschek, D.A.; Shogren, L.; Mathews, J.E.; Verhaaren, B.T.

    1993-11-01

    Argonne National Laboratory conducted an inventory of known archaeological and historic sites in areas that could be affected by the hydropower operation alternatives under analysis in the power marketing environmental impact statement for the Western Area Power Administration`s Salt Lake City Area Integrated Projects. The study areas included portions of the Green River (Flaming Gorge Dam to Cub Creek) in Utah and Colorado and the Gunnison River (Blue Mesa Reservoir to Crystal Dam) in Colorado. All previous archaeological surveys and previously recorded prehistoric and historic sites, structures, and features were inventoried and plotted on maps (only survey area maps are included in this report). The surveys were classified by their level of intensity, and the sites were classified according to their age, type, and contents. These data (presented here in tabular form) permit a general assessment of the character and distribution of archaeological remains in the study areas, as well as an indication of the sampling basis for such an assessment. To provide an adequate context for the descriptions of the archaeological and historic sites, this report also presents overviews of the environmental setting and the regional prehistory, history, and ethnography for each study area.

  11. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  12. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  13. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  14. Preparing the way for coming area wide integrated pest management projects against the new world screwworm, Cochliomyia hominivorax, in MERCOSUR

    Energy Technology Data Exchange (ETDEWEB)

    Mastrangelo, Thiago; Fernandes, Thiago; Walder, Julio, E-mail: piaui@cena.usp.br [Centro de Energia Nuclear na Agricultura (CENA/USP), Piracicaba, SP (Brazil); Bezerra, Fernando [Instituto Federal de Educacao, Ciencia e Tecnologia do Sertao Pernambucano (IFSERTAO-PE), Petrolina, PE (Brazil)

    2011-07-01

    The New World Screwworm (NWS), Cochliomyia hominivorax, was eradicated from the USA, Central America to Panama, but in most tropical regions of Latin America, the NWS is still a serious threat to livestock, provoking estimated annual losses of US$ 1.8 billion in Brazil. Between January and May 2009, a pilot-project was performed at the Brazil-Uruguay border. As the results were positive, novel regional Area-Wide Integrated Pest Management projects are being planned. To set a mass-rearing center based in South America is strategic when considering long-term programs. In partnership with CENA/USP and the Biofactory MOSCAMED Brazil, a project to produce sterile NWS started on 2009. The project aimed to maintain a colony of a regional NWS strain, to develop a mass-rearing system and a sterilization protocol by X rays, and to study the sterility induction in regional strains. A colony was successfully established. The adults were kept in cages and fed on a diet (honey and spray dried egg). The larvae were reared in a medium made of spray dried blood, spray dried egg, milk, water, formalin and Ecogel. Egg hatch has been of 80 {+-} 10%. From F{sub 1} to F{sub 22}, the total amount of pupae produced was about 38 L ({approx} 315,400 pupae). The mean adult emergence and sex ratio were 86.7 {+-} 3% and 0.59 {+-} 0.08 respectively. The mean pupal weight was 47.1 {+-} 1.7 mg. The estimated X ray doses to induce 99% sterility in males and females were 43.7 Gy and 47.5 Gy, respectively. To produce 1.5 L of pupae, the current cost is about US$ 15.00. (author)

  15. Preparing the way for coming area wide integrated pest management projects against the new world screwworm, Cochliomyia hominivorax, in MERCOSUR

    International Nuclear Information System (INIS)

    The New World Screwworm (NWS), Cochliomyia hominivorax, was eradicated from the USA, Central America to Panama, but in most tropical regions of Latin America, the NWS is still a serious threat to livestock, provoking estimated annual losses of US$ 1.8 billion in Brazil. Between January and May 2009, a pilot-project was performed at the Brazil-Uruguay border. As the results were positive, novel regional Area-Wide Integrated Pest Management projects are being planned. To set a mass-rearing center based in South America is strategic when considering long-term programs. In partnership with CENA/USP and the Biofactory MOSCAMED Brazil, a project to produce sterile NWS started on 2009. The project aimed to maintain a colony of a regional NWS strain, to develop a mass-rearing system and a sterilization protocol by X rays, and to study the sterility induction in regional strains. A colony was successfully established. The adults were kept in cages and fed on a diet (honey and spray dried egg). The larvae were reared in a medium made of spray dried blood, spray dried egg, milk, water, formalin and Ecogel. Egg hatch has been of 80 ± 10%. From F1 to F22, the total amount of pupae produced was about 38 L (∼ 315,400 pupae). The mean adult emergence and sex ratio were 86.7 ± 3% and 0.59 ± 0.08 respectively. The mean pupal weight was 47.1 ± 1.7 mg. The estimated X ray doses to induce 99% sterility in males and females were 43.7 Gy and 47.5 Gy, respectively. To produce 1.5 L of pupae, the current cost is about US$ 15.00. (author)

  16. Salt Lake City Area Integrated Projects electric power marketing final environmental impact statement. Volume 4: Appendixes B-D

    International Nuclear Information System (INIS)

    The Colorado River Storage Project Customer Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alter native

  17. Integrated conservation and development: evaluating a community-based marine protected area project for equality of socioeconomic impacts.

    Science.gov (United States)

    Gurney, Georgina G; Pressey, Robert L; Cinner, Joshua E; Pollnac, Richard; Campbell, Stuart J

    2015-11-01

    Despite the prevalence of protected areas, evidence of their impacts on people is weak and remains hotly contested in conservation policy. A key question in this debate is whether socioeconomic impacts vary according to social subgroup. Given that social inequity can create conflict and impede poverty reduction, understanding how protected areas differentially affect people is critical to designing them to achieve social and biological goals. Understanding heterogeneous responses to protected areas can improve targeting of management activities and help elucidate the pathways through which impacts of protected areas occur. Here, we assessed whether the socioeconomic impacts of marine protected areas (MPAs)-designed to achieve goals for both conservation and poverty alleviation-differed according to age, gender or religion in associated villages in North Sulawesi, Indonesia. Using data from pre-, mid- and post-implementation of the MPAs for control and project villages, we found little empirical evidence that impacts on five key socioeconomic indicators related to poverty differed according to social subgroup. We found suggestive empirical evidence that the effect of the MPAs on environmental knowledge differed by age and religion; over the medium and long terms, younger people and Muslims showed greater improvements compared with older people and Christians, respectively. PMID:26460130

  18. Integrated conservation and development: evaluating a community-based marine protected area project for equality of socioeconomic impacts.

    Science.gov (United States)

    Gurney, Georgina G; Pressey, Robert L; Cinner, Joshua E; Pollnac, Richard; Campbell, Stuart J

    2015-11-01

    Despite the prevalence of protected areas, evidence of their impacts on people is weak and remains hotly contested in conservation policy. A key question in this debate is whether socioeconomic impacts vary according to social subgroup. Given that social inequity can create conflict and impede poverty reduction, understanding how protected areas differentially affect people is critical to designing them to achieve social and biological goals. Understanding heterogeneous responses to protected areas can improve targeting of management activities and help elucidate the pathways through which impacts of protected areas occur. Here, we assessed whether the socioeconomic impacts of marine protected areas (MPAs)-designed to achieve goals for both conservation and poverty alleviation-differed according to age, gender or religion in associated villages in North Sulawesi, Indonesia. Using data from pre-, mid- and post-implementation of the MPAs for control and project villages, we found little empirical evidence that impacts on five key socioeconomic indicators related to poverty differed according to social subgroup. We found suggestive empirical evidence that the effect of the MPAs on environmental knowledge differed by age and religion; over the medium and long terms, younger people and Muslims showed greater improvements compared with older people and Christians, respectively.

  19. INTEGRATED PROJECT MANAGEMENT MEASURES IN CMMI

    Directory of Open Access Journals (Sweden)

    Mahmoud Khraiwesh

    2015-10-01

    Full Text Available Project management is quite important to execute projects effectively and efficiently. Project management is vital to projects success. The main challenge of project management is to achieve all project goals, taking into consideration time, scope, budget constraints, and quality. This paper will identify general measures for the two specific goals and its ten specific practices of Integrated Project management Process Area in Capability Maturity Model Integration (CMMI. CMMI is a framework for improvement and assessment of computer information systems. The method we used to define the measures is to apply the Goal Questions Metrics (GQM paradigm to the two specific goals and its ten specific practices of Integrated Project management Process Area in CMMI.

  20. 300 Area Revitalization Project Management Plan

    International Nuclear Information System (INIS)

    The 300 Area Revitalization Team has been tasked with the responsibility to develop an integrated path forward for the 300 Area, as part of a commitment stemming from the 300 Area Disposition Workshop that was held on March 17, 1998. The integrated path forward that is needed must ensure that budget, schedule, and work scopes are complementary between the Programs that are involved in the 300Area. This Project Management Plan (PMP) defines the roles and responsibilities, and the overall approach, to development of a prioritized schedule for 300 Area activities that will achieve the end-state condition

  1. Project Integration Architecture

    Science.gov (United States)

    Jones, William Henry

    2008-01-01

    The Project Integration Architecture (PIA) is a distributed, object-oriented, conceptual, software framework for the generation, organization, publication, integration, and consumption of all information involved in any complex technological process in a manner that is intelligible to both computers and humans. In the development of PIA, it was recognized that in order to provide a single computational environment in which all information associated with any given complex technological process could be viewed, reviewed, manipulated, and shared, it is necessary to formulate all the elements of such a process on the most fundamental level. In this formulation, any such element is regarded as being composed of any or all of three parts: input information, some transformation of that input information, and some useful output information. Another fundamental principle of PIA is the assumption that no consumer of information, whether human or computer, can be assumed to have any useful foreknowledge of an element presented to it. Consequently, a PIA-compliant computing system is required to be ready to respond to any questions, posed by the consumer, concerning the nature of the proffered element. In colloquial terms, a PIA-compliant system must be prepared to provide all the information needed to place the element in context. To satisfy this requirement, PIA extends the previously established object-oriented- programming concept of self-revelation and applies it on a grand scale. To enable pervasive use of self-revelation, PIA exploits another previously established object-oriented-programming concept - that of semantic infusion through class derivation. By means of self-revelation and semantic infusion through class derivation, a consumer of information can inquire about the contents of all information entities (e.g., databases and software) and can interact appropriately with those entities. Other key features of PIA are listed.

  2. Integrated Project Management System description

    International Nuclear Information System (INIS)

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  3. Large-Area, Self-Sufficient, Low-Cost MEMS Skin with Integrated Wirleless Communication Capability Project

    Data.gov (United States)

    National Aeronautics and Space Administration — One of the ultimate goals of sensor research is to build an integrated unit that harnesses its energy from its surroundings and reacts to, and transmits, any...

  4. Large-Area, Self-Sufficient, Low-Cost MEMS Skin with Integrated Wirleless Communication Capability Project

    Data.gov (United States)

    National Aeronautics and Space Administration — An integrated unit that harnesses its energy from its surroundings and reacts to, and transmits, any changes in its environment in a predictable and reliable manner...

  5. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  6. Recent trends on sterile insect technique and area-wide integrated pest management. Economic feasibility, control projects, farmer organization and Bactrocera dorsalis complex control study

    International Nuclear Information System (INIS)

    We have invited professional papers from over the world, including Okinawa, for compilation of recent trends on Sterile Insect Techniques and Area-Wide Integrated Pest Management to further pursue environment friendly pest insects control measures in agricultural production in the Asia-Pacific region. Pest insects such as the tephritid fruit flies have long been and are still today causing serious damage to agricultural products in the Asia-Pacific region and farmers in the region apply such insecticides that are no longer allowed or being subjected to strict usage control in Japan. This, in return, may endanger the health of the very farmers, food safety and the ecosystem itself. The purpose of this report is, therefore, to clarify keys for technology transfer of so called SIT/AWIPM to potential recipients engaged in agricultural production in the region. This report focused on several topics, which make up important parts for the effective Sterile Insect Technique and Area-Wide Integrated Pest Management: economic feasibility; pest insects control projects; farmers' education; research progress in Bactrocera dorsalis complex issues specific to the Asia-Pacific region. The 12 of the papers are indexed individually. (J.P.N.)

  7. Integrated project management type contracts

    International Nuclear Information System (INIS)

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW)

  8. MHD Integrated Topping Cycle Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The Magnetohydrodynamics (MHD) Integrated Topping Cycle (ITC) Project represents the culmination of the proof-of-concept (POC) development stage in the US Department of Energy (DOE) program to advance MHD technology to early commercial development stage utility power applications. The project is a joint effort, combining the skills of three topping cycle component developers: TRW, Avco/TDS, and Westinghouse. TRW, the prime contractor and system integrator, is responsible for the 50 thermal megawatt (50 MW{sub t}) slagging coal combustion subsystem. Avco/TDS is responsible for the MHD channel subsystem (nozzle, channel, diffuser, and power conditioning circuits), and Westinghouse is responsible for the current consolidation subsystem. The ITC Project will advance the state-of-the-art in MHD power systems with the design, construction, and integrated testing of 50 MW{sub t} power train components which are prototypical of the equipment that will be used in an early commercial scale MHD utility retrofit. Long duration testing of the integrated power train at the Component Development and Integration Facility (CDIF) in Butte, Montana will be performed, so that by the early 1990's, an engineering data base on the reliability, availability, maintainability and performance of the system will be available to allow scaleup of the prototypical designs to the next development level. This Sixteenth Quarterly Technical Progress Report covers the period May 1, 1991 to July 31, 1991.

  9. Integrating PHP Projects with Jenkins

    CERN Document Server

    Bergmann, Sebastian

    2011-01-01

    Today's web applications require frequent updates, not just by adding or upgrading features, but by maintaining and improving the software's existing code base as well. This concise book shows PHP developers how to use Jenkins, the popular continuous integration server, to monitor various aspects of software quality throughout a project's lifecycle. You'll learn how to implement continuous integration to automate processes for building and deploying regular software releases. The book also shows you how to use Jenkins to monitor and improve your application through continuous inspection. You

  10. Central stress-integrative circuits: Forebrain glutamatergic and GABAergic projections to the dorsomedial hypothalamus, medial preoptic area, and bed nucleus of the stria terminalis

    OpenAIRE

    Myers, Brent; Dolgas, C. Mark; Kasckow, John; Cullinan, William E.; Herman, James P.

    2013-01-01

    Central regulation of hypothalamo-pituitary-adrenocortical (HPA) axis stress responses is mediated by a relatively circumscribed group of projections to the paraventricular hypothalamus (PVN). The dorsomedial hypothalamus (DMH), medial preoptic area (mPOA), and bed nucleus of the stria terminalis (BST) provide direct, predominantly inhibitory, innervation of the PVN. These PVN-projecting neurons are controlled by descending information from limbic forebrain structures, including the prefronta...

  11. Integrated Project Management System description

    International Nuclear Information System (INIS)

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  12. MHD Integrated Topping Cycle Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The overall objective of the project is to design and construct prototypical hardware for an integrated MHD topping cycle, and conduct long duration proof-of-concept tests of integrated system at the US DOE Component Development and Integration Facility in Butte, Montana. The results of the long duration tests will augment the existing engineering design data base on MHD power train reliability, availability, maintainability, and performance, and will serve as a basis for scaling up the topping cycle design to the next level of development, an early commercial scale power plant retrofit. The components of the MHD power train to be designed, fabricated, and tested include: A slagging coal combustor with a rated capacity of 50 MW thermal input, capable of operation with an Eastern (Illinois {number sign}6) or Western (Montana Rosebud) coal, a segmented supersonic nozzle, a supersonic MHD channel capable of generating at least 1.5 MW of electrical power, a segmented supersonic diffuser section to interface the channel with existing facility quench and exhaust systems, a complete set of current control circuits for local diagonal current control along the channel, and a set of current consolidation circuits to interface the channel with the existing facility inverter.

  13. Thermopile Area Array Readout Project

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA/JPL thermopile detector linear arrays, wire bonded to Black Forest Engineering (BFE) CMOS readout integrated circuits (ROICs), have been utilized in NASA...

  14. Peninsular Florida future scenarios integrated project

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is a integrated scenario project to the Florida state line that incorporates updated critical land and water identification project layers with a decision...

  15. Integration of motor traffic in residential areas.

    NARCIS (Netherlands)

    Schreuder, D.A.

    1977-01-01

    In stead of banning the cars from residential areas, the plan is to integrate them in such a way that they can still be used, but that they will loose their predominant position. The areas where this integration is to take place are called residential yards. This paper concentrates on the lighting r

  16. MHD Integrated Topping Cycle Project

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This fourteenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period November 1, 1990 to January 31, 1991. Testing of the High Pressure Cooling Subsystem electrical isolator was completed. The PEEK material successfully passed the high temperature, high pressure duration tests (50 hours). The Combustion Subsystem drawings were CADAM released. The procurement process is in progress. An equipment specification and RFP were prepared for the new Low Pressure Cooling System (LPCS) and released for quotation. Work has been conducted on confirmation tests leading to final gas-side designs and studies to assist in channel fabrication.The final cathode gas-side design and the proposed gas-side designs of the anode and sidewall are presented. Anode confirmation tests and related analyses of anode wear mechanisms used in the selection of the proposed anode design are presented. Sidewall confirmation tests, which were used to select the proposed gas-side design, were conducted. The design for the full scale CDIF system was completed. A test program was initiated to investigate the practicality of using Avco current controls for current consolidation in the power takeoff (PTO) regions and to determine the cause of past current consolidation failures. Another important activity was the installation of 1A4-style coupons in the 1A1 channel. A description of the coupons and their location with 1A1 channel is presented herein.

  17. The integrated project as a learning experience

    Directory of Open Access Journals (Sweden)

    Maria Angeles Antequera

    2012-03-01

    Full Text Available Florida is a higher education centre specialising in technical and business training. Postgraduate programs, university qualifications, vocational training, secondary education, further education, occupational training and languages are taught at Florida. An educational model in accordance with the demands of the European Higher Education Area has been designed, focussing on teaching for professional competencies. We have chosen to use a methodology which promotes the development of skills and abilities, it promotes participation and it is student-centric as s/he must look for knowledge him/herself thus connecting the educational and the real world. In the different university degrees taught in our centre, each year the student carries out a project set in a real context which integrates specific competencies from the course subject and develops transversal competencies associated with the project which are the purpose of planning and progressive learning: team work, effective communication, conflict resolution, leadership skills, innovation and creativity. The IP counts for 25% of each course in terms of objectives, scheduling and final evaluation. The project grade is an individual grade for each student and is the same for all subjects which form part of the project.

  18. Integrated Data Assimilation Architecture Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Integrated Data Assimilation Architecture (IDAA) is a middleware architecture that facilitates the incorporation of heterogeneous sensing and control devices...

  19. Integrated Data Assimilation Architecture Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Integrated Data Assimilation Architecture (IDAA) addresses the fundamental problem of command, control, and communications systems interoperability....

  20. An Ideal Integrating Bolometer Project

    Data.gov (United States)

    National Aeronautics and Space Administration — An ideal integrating bolometer can achieve breakthrough sensitivity in IR photon detection by removing practical barriers to extreme thermal isolation of the...

  1. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    International Nuclear Information System (INIS)

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  2. Continuous Integrated Invariant Inference Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed project will develop a new technique for invariant inference and embed this and other current invariant inference and checking techniques in an...

  3. NASA UAS Integration into the NAS Project: Human Systems Integration

    Science.gov (United States)

    Shively, Jay

    2016-01-01

    This presentation provides an overview of the work the Human Systems Integration (HSI) sub-project has done on detect and avoid (DAA) displays while working on the UAS (Unmanned Aircraft System) Integration into the NAS project. The most recent simulation on DAA interoperability with Traffic Collision Avoidance System (TCAS) is discussed in the most detail. The relationship of the work to the larger UAS community and next steps are also detailed.

  4. Virtual Satellite Integration Environment Project

    Data.gov (United States)

    National Aeronautics and Space Administration — An integrated environment for rapid design studies of small satellite missions will be developed. This environment will be designed to streamline processes at the...

  5. Virtual Satellite Integration Environment Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Advatech Pacific proposes to develop a Virtual Satellite Integration Environment (VSIE) for the NASA Ames Mission Design Center. The VSIE introduces into NASA...

  6. Integrated Spatial Filter Array Project

    Data.gov (United States)

    National Aeronautics and Space Administration — To address the NASA Earth Science Division need for spatial filter arrays for amplitude and wavefront control, Luminit proposes to develop a novel Integrated...

  7. Integrated Multidisciplinary Optimization Objects Project

    Data.gov (United States)

    National Aeronautics and Space Administration — During Phase I, M4 Engineering integrated a prototype system into OpenMDAO, a NASA GRC open-source framework. This prototype system was a proof-of-concept that M4...

  8. Integrated Multidisciplinary Optimization Objects Project

    Data.gov (United States)

    National Aeronautics and Space Administration — M4 Engineering proposes to implement physics-based, multidisciplinary analysis and optimization objects that will be integrated into a Python, open-source framework...

  9. Human-Systems Integration Processes (HSIP) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — In FY12, this project removed the commercial-specific content from the Commercial Human-Systems Integration Design Processes (CHSIP), identified gaps in the...

  10. Driftless Area Initiative Biomass Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Bertjens, Steve; Wright, Angie; Lieurance, Mike; berguson, bill; Buchman, Dan

    2012-12-31

    The Driftless Area Initiative Biomass Energy Project evaluated the potential for biomass energy production and utilization throughout the Driftless Region of Illinois, Iowa, Minnesota and Wisconsin. The research and demonstration aspect of the project specifically focused on biomass energy feedstock availability and production potential in the region, as well as utilization potential of biomass feedstocks for heat, electrical energy production, or combined heat and power operations. The Driftless Region was evaluated because the topography of the area offers more acres of marginal soils on steep slopes, wooded areas, and riparian corridors than the surrounding “Corn Belt”. These regional land characteristics were identified as potentially providing opportunity for biomass feedstock production that could compete with traditional agriculture commodity crops economically. The project researched establishment methods and costs for growing switchgrass on marginal agricultural lands to determine the economic and quantitative feasibility of switchgrass production for biomass energy purposes. The project was successful in identifying the best management and establishment practices for switchgrass in the Driftless Area, but also demonstrated that simple economic payback versus commodity crops could not be achieved at the time of the research. The project also analyzed the availability of woody biomass and production potential for growing woody biomass for large scale biomass energy production in the Driftless Area. Analysis determined that significant resources exist, but costs to harvest and deliver to the site were roughly 60% than that of natural gas at the time of the study. The project contributed significantly to identifying both production potential of biomass energy crops and existing feedstock availability in the Driftless Area. The project also analyzed the economic feasibility of dedicated energy crops in the Driftless Area. High commodity crop prices and

  11. Driftless Area Initiative Biomass Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Wright, Angie [Northeast Iowa Resource Conservation & Development, Inc., Postville, IA (United States); Bertjens, Steve [Natural Resources Conservation Service, Madison, WI (United States); Lieurance, Mike [Northeast Iowa Resource Conservation & Development, Inc., Postville, IA (United States); Berguson, Bill [Univ. of Minnesota, Minneapolis, MN (United States). Natural Resources Research Inst.; Buchman, Dan [Univ. of Minnesota, Minneapolis, MN (United States). Natural Resources Research Inst.

    2012-12-31

    The Driftless Area Initiative Biomass Energy Project evaluated the potential for biomass energy production and utilization throughout the Driftless Region of Illinois, Iowa, Minnesota and Wisconsin. The research and demonstration aspect of the project specifically focused on biomass energy feedstock availability and production potential in the region, as well as utilization potential of biomass feedstocks for heat, electrical energy production, or combined heat and power operations. The Driftless Region was evaluated because the topography of the area offers more acres of marginal soils on steep slopes, wooded areas, and riparian corridors than the surrounding “Corn Belt”. These regional land characteristics were identified as potentially providing opportunity for biomass feedstock production that could compete with traditional agriculture commodity crops economically. The project researched establishment methods and costs for growing switchgrass on marginal agricultural lands to determine the economic and quantitative feasibility of switchgrass production for biomass energy purposes. The project was successful in identifying the best management and establishment practices for switchgrass in the Driftless Area, but also demonstrated that simple economic payback versus commodity crops could not be achieved at the time of the research. The project also analyzed the availability of woody biomass and production potential for growing woody biomass for large scale biomass energy production in the Driftless Area. Analysis determined that significant resources exist, but costs to harvest and deliver to the site were roughly 60% greater than that of natural gas at the time of the study. The project contributed significantly to identifying both production potential of biomass energy crops and existing feedstock availability in the Driftless Area. The project also analyzed the economic feasibility of dedicated energy crops in the Driftless Area. High commodity crop prices

  12. Western Kenya integrated ecosystem management project

    OpenAIRE

    Kenya Agricultural Research Institute (KARI)

    2007-01-01

    The project seeks to improve the productivity and sustainability of land use systems in selected watersheds in the Nzoia, Yala and Nyando river basins through adoption of an integrated ecosystem management approach. In order to achieve this the project will: (i) support on- and off-farm conservation strategies; and (ii) improve the capacity of local communities and institutions to identify, formulate and implement integrated ecosystem management activities (including both on-and off-farm land...

  13. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  14. Integrated sustainable urban infrastructures in building projects

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Quitzau, Maj-Britt; Elle, Morten;

    2007-01-01

    Current strategies in urban planning and development merely promote standardized building solutions, while failing to prioritize innovative approaches of integration between building projects and sustainable urban infrastructures. As a result of this, urban infrastructures – the urban veins...... – are outdated from a sustainability perspective. This paper looks into more holistic ways of approaching building projects and discuss whether this provide a basis for an increased integration of urban infrastructures within building projects. In our study, we especially emphasise how conventional ways...... of approaching building projects are influenced by lock-in of existing infrastructural systems and compare this with two examples of more holistic ways of approaching building projects, developed by two architecture firms. The paper points out that such holistic perspective in building projects provide...

  15. Integrating Science with Technical and Vocational Areas.

    Science.gov (United States)

    Snyder, Larry; Shreckengast, Craig

    This guide presents learning activities and lesson plans that integrate science with technical and vocational areas. Activities and plans are organized under broad headings such as Environmental Science and Acid Rain Research; Criminal Justice, Chemistry, and Narcotics; Children's Education and Services; Cosmetology; and Health Professions.…

  16. Integrated Project Control and Technical Support

    International Nuclear Information System (INIS)

    PEFP puts it's aim on technology innovation through collaboration among the sub-projects on the various fields. So, this integrated project control system project is necessary to make all of the sub-projects consistent with the project main goal. The system was built in the 1st project phase and has been modified and executed during the 2nd project phase. Firstly, through CPM(Critical Process Management), intensive project process management has been executed. Secondly, supportive activities has been efficiently executed such as purchase, building, installation and a trial running, license, quality control on linac, etc. Especially, the licenses of 20MeV proton linear accelerator and low energy accelerator were approved. Also, tasks involved in international cooperative relationship and host site management were carried out as well, so that PEFP could be firmly supported. Finally, to enhance efficiency and effectiveness of developed technology, several managerial methods were performed: TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Strategy Integration System). Through these procedure, a life cycle management has been carried out successfully from developing stage to commercializing stage of sub-projects

  17. A comparison of electric vehicle integration projects

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Garcia-Valle, Rodrigo; Kempton, Willett

    2012-01-01

    It is widely agreed that an intelligent integration of electric vehicles can yield benefits for electric vehicle owner, power grid, and the society as a whole. Numerous electric vehicle utilization concepts have been investigated ranging from the simple e.g. delayed charging to the more advanced e.......g. utilization of electric vehicles for ancillary services. To arrive at standardized solutions, it is helpful to analyze the market integration and utilization concepts, architectures and technologies used in a set of state-of-the art electric vehicle demonstration projects. The goal of this paper...... is to highlight different approaches to electric vehicle integration in three such projects and describe the underlying technical components which should be harmonized to support interoperability and a broad set of utilization concepts. The projects investigated are the American University of Delaware's V2G...

  18. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  19. Integrative Bioethics: A Conceptually Inconsistent Project.

    Science.gov (United States)

    Ivanković, Viktor; Savić, Lovro

    2016-06-01

    This article provides a critical evaluation of the central components of Integrative Bioethics, a project aiming at a bioethical framework reconceptualization. Its proponents claim that this new system of thought has developed a better bioethical methodology than mainstream Western bioethics, a claim that we criticize here. We deal especially with the buzz words of Integrative Bioethics - pluriperspectivism, integrativity, orientational knowledge, as well as with its underlying theory of moral truth. The first part of the paper looks at what the claims of a superior methodology consist in. The second reveals pluriperspectivism and integrativity to be underdeveloped, hazy terms, but which seem to be underpinned by two theses - the incommensurability and the inclusiveness theses. These theses we critically scrutinize. We then consider strategies the project's proponents might apply to curb these theses in order to acquire minimal consistency for their framework. This part of the article also deals with the conception of moral truth that drives the theory, a position equally burdened with inconsistencies. In the last part of the article, we observe the concept of orientational knowledge, and develop two interpretations of its possible meaning. We claim that, following the first interpretation, Integrative Bioethics is completely descriptive, in which case it is informative and important, but hardly bioethics; if it is normative, following the second interpretation, it is bioethics as we already know it, but merely clad in rhetorical embellishments. We conclude that there is nothing new about this project, and that its inconsistencies are reason enough for its abandonment. PMID:26644388

  20. Integrating ecological restoration into CDM forestry projects

    International Nuclear Information System (INIS)

    Highlights: • Concerns and issues in sustainability of CDM forestry projects are reviewed. • Ecological restoration is suggested to be integrated in the CDM framework. • As an ecosystem supporting service, soil restoration on degraded land is of primary importance. • Regenerating forests naturally rather than through monoculture plantations is suggested. • Potential social impacts of ecological restoration are discussed. - Abstract: The Clean Development Mechanism (CDM) is proposed to reduce greenhouse gas emissions and promote sustainable development. CDM forestry projects should contribute to mitigation of climate change through afforestation and reforestation (A/R) activities on degraded land in developing countries. However, like other types of CDM projects, the forestry projects have encountered a number of concerns and critiques. Appropriate approaches and concrete aims to achieve long-term sustainability have been lacking, and reforms have therefore been called for. The aims of this paper are to examine the published information relevant to these concerns, and frame appropriate approaches for a more sustainable CDM. In this review, as a first step to tackle some of these issues, ecological restoration is suggested for integration into the CDM framework. Essentially, this involves the restoration of ecosystem supporting service (soil restoration), upon which forests regenerate naturally rather than establishing monoculture plantations. In this way, forestry projects would bring cost-effective opportunities for multiple ecosystem services. Potential approaches, necessary additions to the monitoring plans, and social impacts of ecological restoration in CDM projects are discussed

  1. Integrating TQM into environmental restoration projects

    Energy Technology Data Exchange (ETDEWEB)

    Caldwell, J.A. [Jacobs Engineering Group, Inc., Lenexa, KS (United States)

    1992-12-31

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy`s Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review.

  2. Freihoelser Forst Local Training Area rehabilitation project

    Energy Technology Data Exchange (ETDEWEB)

    Hinchman, R.R.; Zellmer, S.D.; Johnson, D.O.; Severinghaus, W.D.; Brent, J.J. (Army Construction Engineering Research Lab., Champaign, IL (United States). Environmental Div.)

    1991-12-01

    Intensive and continued use of the Freihoelser Forst Local Training Area (LTA) for military training activities had resulted in serious environmental problems, exemplified by a lack of vegetative cover and severe erosion by water and wind. The project's goal was to develop and demonstrate rapid, cost-effective methods to stabilize the LTA's barren, eroding maneuver areas and make training conditions more realistic. The major factors limiting rehabilitation efforts were the sandy, infertile, and acidic soils. The project was conducted in two phases. Phase I demonstrated and evaluated three separate rehabilitation treatments ranging in cost from moderate to expensive. Each treatment used a different type of soil amendment (fertilizer and straw, compost, or chicken manure), but all used identical seedbed preparation methods and seed mixtures. Phase I was conducted on relatively small replicated plots and was monitored three times during each growing season. All three treatments satisfactorily reestablished vegetation and controlled erosion. Because of their small size, the Phase I demonstration plots had only a minor stabilizing effect on the erosion problems of the LTA as a whole. The Phase II treatment was based on lessons teamed from Phase I and from other revegetation projects in Germany. Phase II revegetated a large area of the LTA, which included nearly all of the most severely disturbed land. Phase II, which was monitored in the same way as Phase I but for a shorter period of time, was highly successful in stabilizing most areas treated. The revegetation plant community was dominated by native grasses and legumes that stabilized the loose, sandy soils and improved the training realism of a major portion of the LTA.

  3. Smaller families through China's integrated project.

    Science.gov (United States)

    Wang, Y

    1986-11-01

    For the past 2 and 1/2 years, the Integrated Family Planning (FP)/Maternal-Child Health (MCH)/Parasite Control Project has been successful in its information, education and communication (IEC) activities. The integrated project has been promoted through the concerted efforts of the China Family Planning Association (CFPA), the International Planned Parenthood Federation (IPPF) and the Japanese Organization for International Cooperation in Family Planning (JOICEP). Using slides, videotapes, exhibits, printed materials, educational models, a community broadcasting system, congratulatory letters as aids, residents have systematically received information on the integrated project. In addition, a majority of them have voluntarily participated in various project activities. Over 80,000 people have watched scientific education films in 469 showings. The prenatal mortality rate dropped from 3.02% in 1983 to 1.69% in 1985. Breastfeeding has become more popular. A local drama encourages the use of suitable contraceptives. Social gatherings and the use of the community broadcasting system have encouraged people to talk about family planning. A variety of medical and other services are provided in addition to the IEC activities. People are now actively protecting their environment, receiving health check-ups, controlling parasites and promoting maternal and child health. Married couples of reproductive age are practicing family planning voluntarily. Parasite infection rates have decreased. The integrated project has contributed to the promotion of the family planning program and the enhancement of the quality of the population. Most of the married couples of reproductive age desire to have a small family in order to rear strong and healthy children. PMID:12314472

  4. TMI-2 Vessel Investigation Project integration report

    Energy Technology Data Exchange (ETDEWEB)

    Wolf, J. R.; Rempe, J. L.; Stickler, L. A.; Korth, G. E.; Diercks, D. R.; Neimark, L. A.; Akers, D W; Schuetz, B. K.; Shearer, T L; Chavez, S. A.; Thinnes, G. L.; Witt, R. J.; Corradini, M L; Kos, J. A. [EG and G Idaho, Inc., Idaho Falls, ID (United States)

    1994-03-01

    The Three Mile Island Unit 2 (TMI-2) Vessel Investigation Project (VIP) was an international effort that was sponsored by the Nuclear Energy Agency of the Organization for Economic Cooperation and Development. The primary objectives of the VIP were to extract and examine samples from the lower head and to evaluate the potential modes of failure and the margin of structural integrity that remained in the TMI-2 reactor vessel during the accident. This report presents a summary of the major findings and conclusions that were developed from research during the VIP. Results from the various elements of the project are integrated to form a cohesive understanding of the vessel`s condition after the accident.

  5. Stakeholder Inequalities in Integrated Coastal Management Projects

    OpenAIRE

    Glaesel, H.

    2000-01-01

    Integrated Coastal Management (ICM) projects bring together diverse stakeholders to share knowledge, power, and responsibility for local and regional planning. As such, ICMs may be viewed as microcosms of international conferences on development and environment. In each case more powerful stakeholders support an environmental conservation agenda at the expense of the socio-economic development interests of the less powerful stakeholders while concealing inequalities in influenc...

  6. Regional energy projects in the Eurasian Area

    Directory of Open Access Journals (Sweden)

    Vesić Dobrica

    2012-03-01

    Full Text Available The Eurasian area has a very rich energy reserves, and is characterized by a complex network of relationships between major suppliers and consumers. The central place in this area has Russia as a country richest in energy resources in Eurasia. Beside her, the European Union is the largest economic and political grouping in the world, and a huge consumer of energy. The dynamic development of Chinese economy requires more energy imports by China. Dependence of the European Union and China on imported energy is high and will grow in the future. Russia is the world's dominant natural gas producer and one of the two largest oil producers in the world. Russia is the largest natural gas supplier of the EU and a significant oil and natural gas supplier of China. Energy projects in Eurasia are the result of the need to strengthen the stability of energy supplies, efforts to diversify sources of supply, and the geographic redistribution of Russian oil and gas exports. Although the interests of the main actors often do not agree, the reasons of energy security affect the development of joint energy projects.

  7. Magnetohydrodynamic projects at the CDIF (Component Development and Integration Facility)

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    This quarterly technical progress report presents the tasks accomplished at the Component Development and Integration Facility during the fourth quarter of FY90. Areas of technical progress this quarter included: coal system development; seed system development; test bay modification; channel power dissipation and distribution system development; oxygen system storage upgrade; iron core magnet thermal protection system oxygen checkout; TRW slag rejector/CDIF slag removal project; stack gas/environmental compliance upgrade; coal-fired combustor support; 1A channels fabrication and assembly; support of Mississippi State University diagnostic testing; test operations and results; data enhancement; data analysis and modeling; technical papers; and projected activities. 2 tabs.

  8. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Joo, Po Kook; Kim, Gye Ryung (and others)

    2003-06-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the subprojects from the various fields, It has been tried to make the subprojects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, TRM(Technology Road Map) is made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  9. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  10. Integrated Project Control and Technical Support

    International Nuclear Information System (INIS)

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage

  11. The Nikola project intelligent electric vehicle integration

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Marinelli, Mattia; Olesen, Ole Jan;

    2014-01-01

    The electric vehicle (EV) has certain properties that elevate its relevance to the smart grid. If EV integration is to meet its potential in supporting an economic and secure power system and at the same time lower the operating costs for the owner, it is necessary to thoroughly and systematically...... investigate the value-adding services that an EV may provide. The Danish Nikola project defines EV services as the act of influencing the timing, rate and direction of the power and energy exchanged between the EV battery and the grid to yield benefits for user, system, and society. This paper describes...

  12. Climate Change Projections for African Urban Areas

    Science.gov (United States)

    Simonis, Ingo; Engelbrecht, Francois; Bucchignani, Edoardo; Mercogliano, Paola; Naidoo, Mogesh

    2013-04-01

    Mainly driven by changes in the orbital characteristics of Earth around the sun, the planet's climate has been continuously changing over periods of tens of thousands of years. However, the warming that has been detected in the Earth's atmosphere over the last century is occurring at a rate that cannot be explained by any known natural cycle. Main-stream science has indeed reached consensus that the 'enhanced green house effect', caused by the interplay of incoming short-wave irradiation, outgoing long-wave radiation and the absorption of energy by enhanced levels of CO2 and water vapour in the troposphere, is the main forcing mechanism responsible for the phenomena of global warming. The enhanced greenhouse effect strengthens the 'natural green house effect' that results from the CO2 and water vapour occurring naturally in the atmosphere. The continuous burning of fossil fuels since the industrial revolution and the simultaneous degradation of large forests, are the main reasons for the increase in CO2 concentrations in the atmosphere. The availability of climate change projection data varies considerably for different areas on Earth. Whereas the data centres storing climate change projections for Europe and North America now store petabytes of data, regionally downscaled projections for Africa are rarely available. In the context of the research project CLUVA, (Assessing vulnerability of urban systems, populations and goods in relation to natural and man-made disasters in Africa, co-funded by the European Commission under grant agreement no: 265137), the Council for Industrial and Scientific Research (CSIR) in South Africa and the Centro Euro-Mediterraneo sui Cambiamenti Climatici (CMCC) in Italy have produced a large set of projections of climate change over Africa, covering the time period 1950 to 2100. Through the collaboration between CMCC and CSIR, a multi-model ensemble of eight high-resolution simulations of climate change over parts of West and East

  13. Integrated monitoring and surveillance system demonstration project

    International Nuclear Information System (INIS)

    We present a summary of efforts associated with the installation of an integrated system for the surveillance and monitoring of stabilized plutonium metals and oxides in long-term storage. The product of this effort will include a Pu storage requirements document, baseline integrated monitoring and surveillance system (IMSS) prototype and test bed that will be installed in the Fuel Manufacturing Facility (FMF) nuclear material vault at Argonne National Laboratory - West (ANL-W), and a Pu tracking database including data analysis capabilities. The prototype will be based on a minimal set of vault and package monitoring requirements as derived from applicable DOE documentation and guidelines, detailed in the requirements document, including DOE-STD-3013-96. The use of standardized requirements will aid individual sites in the selection of sensors that best suit their needs while the prototype IMSS, located at ANL-W, will be used as a test bed to compare and contrast sensor performance against a baseline integrated system (the IMSS), demonstrate system capabilities, evaluate potential technology gaps, and test new hardware and software designs using various storage configurations. With efforts currently underway to repackage and store a substantial quantity of plutonium and plutonium-bearing material within the DOE complex, this is an opportune time to undertake such a project. 4 refs

  14. Integrated monitoring and surveillance system demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Aumeier, S.E.; Walters, G. [Argonne National Lab., Idaho Falls, ID (United States); Kotter, D.; Walrath, W.M.; Zamecnik, R.J. [Lockheed-Martin Idaho Technologies Company, Idaho Falls, ID (United States)

    1997-07-01

    We present a summary of efforts associated with the installation of an integrated system for the surveillance and monitoring of stabilized plutonium metals and oxides in long-term storage. The product of this effort will include a Pu storage requirements document, baseline integrated monitoring and surveillance system (IMSS) prototype and test bed that will be installed in the Fuel Manufacturing Facility (FMF) nuclear material vault at Argonne National Laboratory - West (ANL-W), and a Pu tracking database including data analysis capabilities. The prototype will be based on a minimal set of vault and package monitoring requirements as derived from applicable DOE documentation and guidelines, detailed in the requirements document, including DOE-STD-3013-96. The use of standardized requirements will aid individual sites in the selection of sensors that best suit their needs while the prototype IMSS, located at ANL-W, will be used as a test bed to compare and contrast sensor performance against a baseline integrated system (the IMSS), demonstrate system capabilities, evaluate potential technology gaps, and test new hardware and software designs using various storage configurations. With efforts currently underway to repackage and store a substantial quantity of plutonium and plutonium-bearing material within the DOE complex, this is an opportune time to undertake such a project. 4 refs.

  15. Progress Report 15, December 1979-April 1980, and proceedings of the fifteenth Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period December 1979 to April 1980 is reported. Reports on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering; and operations are included. Also, a report on, and copies of visual presentations made at, the Project Integration Meeting held April 2 and 3, 1980, are included.

  16. Project TIMS (Teaching Integrated Math/Science)

    Science.gov (United States)

    Edwards, Leo, Jr.

    1993-01-01

    The goal of this project is to increase the scientific knowledge and appreciation bases and skills of pre-service and in-service middle school teachers, so as to impact positively on teaching, learning, and student retention. This report lists the objectives and summarizes the progress thus far. Included is the working draft of the TIMS (Teaching Integrated Math/Science) curriculum outline. Seven of the eight instructional subject-oriented modules are also included. The modules include informative materials and corresponding questions and educational activities in a textbook format. The subjects included here are the universe and stars; the sun and its place in the universe; our solar system; astronomical instruments and scientific measurements; the moon and eclipses; the earth's atmosphere: its nature and composition; and the earth: directions, time, and seasons. The module not included regards winds and circulation.

  17. Integral cohomology of rational projection method patterns

    CERN Document Server

    Gaehler, Franz; Kellendonk, Johannes

    2012-01-01

    We study the cohomology and hence K-theory of the aperiodic tilings formed by the so called `cut and project' method, i.e., patterns in d dimensional Euclidean space which arise as sections of higher dimensional, periodic structures. They form one of the key families of patterns used in quasicrystal physics, where their topological invariants carry quantum mechanical information. Our work develops both a theoretical framework and a practical toolkit for the discussion and calculation of their integral cohomology, and extends previous work that only successfully addressed rational cohomological invariants. Our framework unifies the several previous methods used to study the cohomology of these patterns. We obtain explicit calculational results for the main examples of icosahedral patterns in R^3 -- the Danzer tiling, the Ammann-Kramer tiling and the Canonical and Dual Canonical D_6 tilings -- as well as results for many of the better known 2 dimensional examples.

  18. 15 CFR 291.2 - Environmental integration projects.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Environmental integration projects... NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE NIST EXTRAMURAL PROGRAMS MANUFACTURING EXTENSION PARTNERSHIP; ENVIRONMENTAL PROJECTS § 291.2 Environmental integration projects....

  19. Researchers' Experiences, Positive and Negative, in Integrative Landscape Projects

    Science.gov (United States)

    Tress, Bärbel; Tress, Gunther; Fry, Gary

    2005-12-01

    Integrative (interdisciplinary and transdisciplinary) landscape research projects are becoming increasingly common. As a result, researchers are spending a larger proportion of their professional careers doing integrative work, participating in shifting interdisciplinary teams, and cooperating directly with non-academic participants. Despite the growing importance of integrative research, few studies have investigated researchers’ experiences in these projects. How do researchers perceive the outcomes of integrative projects, or career effects? Do they view the projects generally as successes or failures? This study analyses researchers’ experiences in integrative landscape studies and investigates what factors shape these experiences. The data stems from 19 semi-structured qualitative interviews and a Web-based survey among 207 participants in integrative landscape research projects. It finds that researchers experience participation in integrative projects as positive, in particular discussions among participants, networking, teamwork, and gaining new insights and skills. Furthermore, most researchers perceive the projects as successful and as having a positive effect on their careers. Less positive aspects of integration relate to publications and merit points. Factors found to contribute to positive experiences include reaching a high degree of integration amongst the involved disciplines, common definitions of integrative research concepts, and projects that include a large share of fundamental research as well as projects with many project outcomes. Based on these findings, we advise future projects to plan for integration, facilitate discussions, and reach agreement on integrative concepts. We suggest that aspects of fundamental research be included in integrative projects. We also suggest that planning be done at an early stage for peer-reviewed publications, to ensure that participants gain merit points from their participation in integrative research

  20. Researchers' experiences, positive and negative, in integrative landscape projects

    OpenAIRE

    Tress, B.; Tress, G.; Fry, G.

    2005-01-01

    Integrative (interdisciplinary and transdisciplinary) landscape research projects are becoming increasingly common. As a result, researchers are spending a larger proportion of their professional careers doing integrative work, participating in shifting interdisciplinary teams, and cooperating directly with non-academic participants. Despite the growing importance of integrative research, few studies have investigated researchers¿ experiences in these projects. How do researchers perceive the...

  1. Integrating configuration workflows with project management system

    Science.gov (United States)

    Nilsen, Dimitri; Weber, Pavel

    2014-06-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  2. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  3. Development of integrated software project planning model

    OpenAIRE

    Manalif, Ekananta; Capretz, Luiz Fernando; Ho, Danny

    2012-01-01

    As the most uncertain and complex project when compared to other types of projects, software development project is highly depend on the result of software project planning phase that helping project managers by predicting the project demands with respect to the budgeting, scheduling, and the allocation of resources. The two main activities in software project planning are effort estimation and risk assessment which has to be executed together because the accuracy of the effort estimation is ...

  4. A Survey on Software Project Management Report Part I Importance of Project Management Areas

    OpenAIRE

    Demir, Kadir Alpaslan

    2008-01-01

    Visit research website for more information and reports http://faculty.nps.edu/kdemir/spm.htm The objectives of this study are to identify (i) the importance of various project management areas and (ii) project management challenges in software projects.

  5. Selecting Map Projections in Minimizing Area Distortions in GIS Applications

    Directory of Open Access Journals (Sweden)

    Ahmet Kaya

    2008-12-01

    Full Text Available Varioussoftware for Geographical Information Systems (GISs have been developed and used in many different engineering projects. In GIS applications, map coverage is important in terms of performing reliable and meaningful queries. Map projections can be conformal, equal-area and equidistant. The goal of an application plays an important role in choosing one of those projections. Choosing the equal-area projection for an application in which area information is used (forestry, agriculture, ecosystem etc reduces the amount of distortion on the area, but many users using GIS ignore this fact and continue to use applications with present map sheets no matter in what map projection it is. For example, extracting area information from data whose country system’s map sheet is in conformal projection is relatively more distorted, compared to an equal-area projection one. The goal of this study is to make the best decision in choosing the most proper equal-area projection among the choices provided by ArcGIS 9.0, which is a popular GIS software package, and making a comparison on area errors when conformal projection is used. In this study, the area of parcels chosen in three different regions and geographic coordinates and whose sizes vary between 0.01 to 1,000,000 ha are calculated according to Transversal Mercator (TM, 3°, Universal Transversal Mercator (UTM, 6° and 14 different equal-area projections existing in the ArcGIS 9.0 GIS software package. The parcel areas calculated with geographical coordinates are accepted as definite. The difference between the sizes calculated according to projection coordinates and real sizes of the parcels are determined. Consequently, the appropriate projections are decided for the areas smaller and equal than 1,000 ha and greater than 1,000 ha in the GIS software package.

  6. Researchers' experiences, positive and negative, in integrative landscape projects

    NARCIS (Netherlands)

    Tress, B.; Tress, G.; Fry, G.

    2005-01-01

    Integrative (interdisciplinary and transdisciplinary) landscape research projects are becoming increasingly common. As a result, researchers are spending a larger proportion of their professional careers doing integrative work, participating in shifting interdisciplinary teams, and cooperating direc

  7. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  8. Integrating workflow and project management systems for PLM applications

    Directory of Open Access Journals (Sweden)

    Fabio Fonseca Pereira de Paula

    2008-07-01

    Full Text Available The adoption of Product Life-cycle Management Systems (PLMs concept is fundamental to improve the product development, mainly to small and medium enterprises (SMEs. One of the challenges is the integration between project management and product data management functions. The paper presents an analysis of the potential integration strategies for a specifics product data management system (SMARTEAM and a project management system (Microsoft Project, which are commonly used for SMEs. Finally the article presents some considerations about the study of Project Management solutions in SMB’s companies, considering the PLM approach. Key-words: integration, project management (PM, workflow, PDM, PLM.

  9. Sediment Properties: E-Area Completion Project

    Energy Technology Data Exchange (ETDEWEB)

    Millings, M.; Bagwell, L.; Amidon, M.; Dixon, K.

    2011-04-29

    To accommodate a future need for additional waste disposal facilities at the Savannah River Site, the Solid Waste Management Division (SWMD) designated nine additional plots for development (Kasraii 2007; SRS 2010); these plots are collectively known as the E Area Completion Project (ECP). Subsurface samples were collected from ECP plots 6, 7, 8 and 9 (Figure 1) for chemical and physical property analyses to support Performance Assessment (PA) and Special Analyses (SA) modeling. This document summarizes the sampling and analysis scheme and the resultant data, and provides interpretations of the data particularly in reference to existing soil property data. Analytical data in this document include: gamma log, cone penetrometer log, grain size (sieve and hydrometer), water retention, saturated hydraulic conductivity (falling head permeameter), porosity, dry bulk density, total organic carbon, x-ray diffraction, and x-ray fluorescence data. SRNL provided technical and safety oversight for the fieldwork, which included completion of eight soil borings, four geophysical logs, and the collection of 522 feet of core and 33 Shelby tubes from ECP plots 6, 7, 8, and 9. Boart Longyear provided sonic drilling and logging services. Two soil borings were completed at each location. The first set of boreholes extended into (but did not fully penetrate) the Warley Hill Formation. These boreholes were continuously cored, then geophysically (gamma ray) logged. The recovered core was split, photographed, and described; one half of the core was archived at SRS's Core Lab facilities, and the remaining half was consumed as necessary for testing at SRS and off-site labs. Core descriptions and geophysical data were used to calculate target elevations for Shelby tube samples, which were obtained from the second set of boreholes. Shelby tubes were shipped to MACTEC Engineering and Consulting Inc. (MACTEC) in Atlanta for physical property testing. SRNL deployed their Site

  10. Further Integrating Euro Area Economies: Some Reflections

    OpenAIRE

    Jean-Claude Trichet

    2006-01-01

    Als Gastredner bei der diesjährigen Jahresversammlung konnte der Vorsitzende der Präsident der Europäischen Zentralbank, Jean-Claude Trichet, gewonnen werden. In seinem Festvortrag ging er der Frage nach, inwieweit die Einführung des Euro die europäische Integration befördert hat und welche Reformen noch ausstehen, um die Wirtschaftssysteme der Euroländer flexibler zu gestalten.

  11. A Survey on Software Project Management Report Part I Importance of Project Management Areas (Short Version)

    OpenAIRE

    Demir, Kadir Alpaslan

    2008-01-01

    Visit research website for more information and reports http://faculty.nps.edu/kdemir/spm.htm Objectives of this Study: The objectives of this study are to identify (i) the importance of various project management areas and (ii) project management challenges in software projects. This study is conducted to form a basis for a software project management framework. This report focuses on the first part of the objective. The project management areas are identified through extensiv...

  12. Low-Cost Solar Array Project. Progress report 14, August 1979-December 1979 and proceedings of the 14th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period August through November 1979, is described. Progress on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering, and operations, and the steps taken to integrate these efforts are detailed. A report on the Project Integration Meeting held December 5-6, 1979, including copies of the visual materials used, is presented.

  13. Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held April 4-5, 1979.

  14. Integrated Ground Operations Demonstration Units Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the project is to demonstrate cost efficient cryogenic operations on a relevant scale that can be projected onto future Spaceport architectures...

  15. Art and Technology Integration Project: Year 1 Status Report.

    Science.gov (United States)

    Ostler, Elliott; And Others

    This report provides a progress report on the Art and Technology Integration Project (ATI), a partnership of the Westside and Grand Island Public Schools, the Smithsonian Institution's National Museum of American Art (NMAA), and the University of Nebraska at Omaha (UNO). The ATI project focuses on long-range assessment of the integration of the…

  16. Radwaste inventories and projections: an overview. [Integrated Data Base

    Energy Technology Data Exchange (ETDEWEB)

    Notz, K.J. (ed.)

    1982-07-01

    The Integrated Data Base program was set up to provide fully integrated and reconciled inventories, characteristics, and projections for spent nuclear fuel and all categories of radioactive waste. Eight summary papers, six of which were presented at an ANS special session in Los Angeles in June 1982, are included in this report: data base needs and functions: national planning; integrated data base for spent fuel and radwaste: inventories; integrated data base projections; RAWSYM: radioactive waste management system; NWTS program waste projection data needs; low-level waste management data base system; waste sludge composition at the Savannah River Plant; and summary of characteristics of transuranic waste found at DOE sites. (DLC)

  17. TECHNICAL INTEGRATION ENVIRONMENTAL MANAGEMENT FOCUS AREAS

    Energy Technology Data Exchange (ETDEWEB)

    Carey R. Butler

    2001-10-01

    This contract involved a team of companies led by WPI (formerly the Waste Policy Institute). In addition to WPI, the team included four subcontractors--TRW (formerly BDM Federal), SAIC, Energetics, and the University of North Dakota Energy and Environmental Research Center (EERC). The team of companies functioned as a ''seamless team'' assembled to support the Environmental Management Program Focus Areas. Staff resources were applied in the following offices: Richland, Washington, Idaho Falls, Idaho, Morgantown, West Virginia, Grand Forks, North Dakota, Aiken, South Carolina, Gaithersburg, Maryland, and Blacksburg, Virginia. These locations represented a mixture of site support offices at the field focus area locations and central staff to support across the focus areas. The management of this dispersed resource base relied on electronic communication links to allow the team to function as a ''virtual office'' to address tasks with the best qualified staff matched to the task assignments. A variety of tasks were assigned and successfully completed throughout the life of the contract that involved program planning and analysis, program execution, program information management and communication and data transmission.

  18. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Williams, C.V.; Burford, T.D. [Sandia National Labs., Albuquerque, NM (United States). Environmental Restoration Technologies; Allen, C.A. [Tech Reps, Inc., Albuquerque, NM (United States)

    1996-08-01

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy`s (DOE`s) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID`s technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID.

  19. Technology integration project: Environmental Restoration Technologies Department Sandia National Laboratories

    International Nuclear Information System (INIS)

    Sandia National Laboratories Environmental Restoration Technologies Department is developing environmental restoration technologies through funding form the US Department of Energy's (DOE's) Office of Science and Technology. Initially, this technology development has been through the Mixed Waste Landfill Integrated Demonstration (MWLID). It is currently being developed through the Contaminant Plume containment and Remediation Focus Area, the Landfill Stabilization Focus Area, and the Characterization, Monitoring, and Sensor Cross-Cutting Program. This Technology Integration Project (TIP) was responsible for transferring MWLID-developed technologies for routine use by environmental restoration groups throughout the DOE complex and commercializing these technologies to the private sector. The MWLID's technology transfer/commercialization successes were achieved by involving private industry in development, demonstration, and technology transfer/commercialization activities; gathering and disseminating information about MWLID activities and technologies; and promoting stakeholder and regulatory involvement. From FY91 through FY95, 30 Technical Task Plans (TTPs) were funded. From these TTPs, the MWLID can claim 15 technology transfer/commercialization successes. Another seven technology transfer/commercialization successes are expected. With the changeover to the focus areas, the TIP continued the technology transfer/commercialization efforts begun under the MWLID

  20. Reduction of radiation area project plan

    International Nuclear Information System (INIS)

    This plan deals with the overall reduction of outdoor surface radiation areas under Rockwell's jurisdiction. Four basic alternatives are identified which will reduce and/or stabilize radiation areas until long-term disposal decisions are made: (1) continued routine surveillance and maintenance; (2) reduction or elimination of effluent discharges; (3) improved site stabilization; and (4) site removal. The four major transport mechanisms at Hanford that are the primary forces for contamination spread are identified as wind, animal transport, concentration and dispersal by plants, and transport resulting from human activities

  1. Application of Participatory Method to Selection of Project Demonstration Area

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    The Sino-Japan cooperation project of "Vegetation Rehabilitation Demonstration and Planning in Sandstorm Jeopardized Area around Beijing" introduced participatory method to select the project area. Through investigating the socioeconomic indicators of 9 villages in Beijing and Hebei Province as well as the farmers’ willingness to participate in forestry operation activities, the vegetation restoration demonstration areas were selected, including Hantai Village, Baicaowa Village and Xiabachi Village, respect...

  2. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  3. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  4. Low NOx Fuel Flexible Combustor Integration Project Overview

    Science.gov (United States)

    Walton, Joanne C.; Chang, Clarence T.; Lee, Chi-Ming; Kramer, Stephen

    2015-01-01

    The Integrated Technology Demonstration (ITD) 40A Low NOx Fuel Flexible Combustor Integration development is being conducted as part of the NASA Environmentally Responsible Aviation (ERA) Project. Phase 2 of this effort began in 2012 and will end in 2015. This document describes the ERA goals, how the fuel flexible combustor integration development fulfills the ERA combustor goals, and outlines the work to be conducted during project execution.

  5. Ten steps to success in integrative research projects

    NARCIS (Netherlands)

    Tress, B.; Tress, G.; Fry, G.

    2006-01-01

    Research in the INTELS project has revealed that many integrative (= interdisciplinary and transdisciplinary) landscape projects frequently face similar challenges. There are, however, few guidelines available to help projects avoid common problems. In this chapter, we present what we consider the t

  6. Assess the flood resilience tools integration in the landuse projects

    Science.gov (United States)

    Moulin, E.; Deroubaix, J.-F.

    2012-04-01

    Despite a severe regulation concerning the building in flooding areas, 80% of these areas are already built in the Greater Paris (Paris, Val-de-Marne, Hauts-de-Seine and Seine-Saint-Denis). The land use in flooding area is presented as one of the main solutions to solve the ongoing real estate pressure. For instance some of the industrial wastelands located along the river are currently in redevelopment and residential buildings are planned. So the landuse in the flooding areas is currently a key issue in the development of the Greater Paris area. To deal with floods there are some resilience tools, whether structural (such as perimeter barriers or building aperture barriers, etc) or non structural (such as warning systems, etc.). The technical solutions are available and most of the time efficient1. Still, we notice that these tools are not much implemented. The people; stakeholders and inhabitants, literally seems to be not interested. This papers focus on the integration of resilience tools in urban projects. Indeed one of the blockages in the implementation of an efficient flood risk prevention policy is the lack of concern of the landuse stakeholders and the inhabitants for the risk2. We conducted an important number of interviews with stakeholders involved in various urban projects and we assess, in this communication, to what extent the improvement of the resilience to floods is considered as a main issue in the execution of an urban project? How this concern is maintained or could be maintained throughout the project. Is there a dilution of this concern? In order to develop this topic we rely on a case study. The "Ardoines" is a project aiming at redeveloping an industrial site (South-East Paris), into a project including residential and office buildings and other amenities. In order to elaborate the master plan, the urban planning authority brought together some flood risk experts. According to the comments of the experts, the architect in charge of the

  7. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  8. Heterogeneous Chip Integration for GHz Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Indiana Integrated Circuits, LLC (IIC) proposes to develop the customizable, high-performance microchip interconnect technology called Quilt Packaging (QP) to...

  9. Advanced Microgravity Compatible, Integrated Laundry System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Advanced Microgravity Compatible, Integrated Laundry (AMCIL) is a microgravity compatible liquid / liquid vapor, two-phase laundry system with water jet...

  10. Integrated Variable Fidelity Conceptual Design Project

    Data.gov (United States)

    National Aeronautics and Space Administration — CADNexus proposes to develop an Integrated Variable Fidelity Conceptual Design tool. The application will enable design and analysis of unconventional and advanced...

  11. Structural Integrity Inspection and Visualization System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — To address NASA's need for compact nondestructive evaluation (NDE) of the structural integrity of spacecraft components and structures, Physical Optics Corporation...

  12. Progress report 13 for April 1979-August 1979 and proceedings of the 13th project integration meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period April through August 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held August 22-23, 1979.

  13. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  14. Integrated Power, Avionics, and Software (IPAS) Flexible Systems Integration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — iPAS will develop several important technologies required to support system design and integration as well as space technology maturation. These services include:A...

  15. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  16. Advanced Microgravity Compatible, Integrated Laundry System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — An Advanced Microgravity Compatible, Integrated laundry System (AMCILS) is proposed that uses a two phase water / water vapor system to allow good agitation of...

  17. LVIS Integration onto Global Hawk Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Integrate LVIS lidar capability onto the Global Hawk (GH) to enable high altitude mapping of land, vegetation, and ice Provide operational capability and data...

  18. Monolithic Time Delay Integrated APD Arrays Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the proposed program by Epitaxial Technologies is to develop monolithic time delay integrated avalanche photodiode (APD) arrays with sensitivity...

  19. Mars Integrated Propellant Production System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Integrated Mars In-Situ Propellant Production System (IMISPPS) is an end-to-end system that will produce rocket propellant on Mars from CO2 in the Martian...

  20. Fully Integral, Flexible Composite Driveshaft Project

    Data.gov (United States)

    National Aeronautics and Space Administration — An all-composite driveshaft incorporating integral flexible diaphragms is described and proposed for phase II prime conractor testing. The approach obsoletes the...

  1. Fully Integral, Flexible Composite Driveshaft Project

    Data.gov (United States)

    National Aeronautics and Space Administration — An all-composite driveshaft incorporating integral flexible diaphragms is described and proposed for further refinement. An approach is explored which obsoletes the...

  2. Integrated Composite Rocket Nozzle Extension Project

    Data.gov (United States)

    National Aeronautics and Space Administration — ORBITEC proposes to develop and demonstrate an Integrated Composite Rocket Nozzle Extension (ICRNE) for use in rocket thrust chambers. The ICRNE will utilize an...

  3. Structural Integrity Inspection and Visualization System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Based on the successful feasibility demonstration in Phase I, Physical Optics Corporation (POC) proposes to continue the development of a novel Structural Integrity...

  4. Photovoltaic concentrator technology development project. Sixth project integration meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  5. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  6. High Efficiency Lighting with Integrated Adaptive Control (HELIAC) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The innovation of the proposed project is the development of High Efficiency Lighting with Integrated Adaptive Control (HELIAC) systems to drive plant growth. Solar...

  7. High Efficiency Lighting with Integrated Adaptive Control (HELIAC) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed project is the continued development of the High Efficiency Lighting with Integrated Adaptive Control (HELIAC) system. Solar radiation is not a viable...

  8. UAS Integration in the NAS Project - FY 14 Annual Review

    Science.gov (United States)

    Grindle, Laurie; Randall, Debra; Hackenberg, Davis

    2014-01-01

    This briefing gives insight into the research activities and efforts being executed in order to integrate unmanned aircraft systems into the national airspace system. This briefing is to inform others of the UAS-NAS Projects progress and future directions.

  9. Project Management Data Retrieval and Integration (PMDRI) Application

    Data.gov (United States)

    Department of Veterans Affairs — The Project Management Data Retrieval and Integration Database (PMDRI) is a system that presents data from the VA Financial Management System(FMS) in a structured...

  10. Water Integration Project Science Strategies White Paper

    Energy Technology Data Exchange (ETDEWEB)

    Alan K. Yonk

    2003-09-01

    This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document.

  11. Integrating sustainable growth into export pipeline projects

    International Nuclear Information System (INIS)

    Full text: Sustainable growth in the energy industry is rapidly expanding beyond the conceptual stage. Policies addressing the three principles of Sustainable Development are being established and strategies to execute these policies are being developed and implemented in the field. Conoco is developing a strong corporate culture around sustainable growth; and, pipeline systems play a vital role in delivering the triple bottom line results for our stake holders. This paper will highlight some of the key focal points by Conoco Inc., in each phase of pipeline project development, execution, and operation to make pipeline projects a contributor to Conoco's sustainable growth success, and shares some lessons learned

  12. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954 the Resource Conservation and Recovery Act of 1976 the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/frequency matrix for the entire site. The objectives of monitoring fall into three general categories plume and trend tracking, treatment/storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  13. Enhancing Knowledge Integration: An Information System Capstone Project

    Science.gov (United States)

    Steiger, David M.

    2009-01-01

    This database project focuses on learning through knowledge integration; i.e., sharing and applying specialized (database) knowledge within a group, and combining it with other business knowledge to create new knowledge. Specifically, the Tiny Tots, Inc. project described below requires students to design, build, and instantiate a database system…

  14. DEVELOPMENT POLICIES IN ALBA IULIA AREA OF INFLUENCE. AN INTEGRATED APPROACH

    Directory of Open Access Journals (Sweden)

    S. A. NICULA

    2015-06-01

    Full Text Available Development Policies in Alba Iulia Area of Influence. An Integrated Approach. The paper represents an integrated and holarchical perspective on the spatial development policies and its component measures and projects related to the City of Alba Iulia, its area of influence and the all-encompassing County of Alba, Romania. The goal was to see how the development and management policies from all levels merge into a single strategic framework that might create a favourable basis for the sustainable growth of Alba Iulia and its area of influence. As this area surrounding the city is subjected to different hierarchical plans and programmes, some that are not properly correlated, it is extremely clear that this area and Areas of Influence in general need legislative stipulations made specifically for them and also a well-thought holarchical planning approach.

  15. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  16. 78 FR 43870 - Hydrogen Energy California's Integrated Gasification Combined Cycle Project; Preliminary Staff...

    Science.gov (United States)

    2013-07-22

    ... of Availability Hydrogen Energy California's Integrated Gasification Combined Cycle Project... availability of the Hydrogen Energy California's Integrated Gasification Combined Cycle Project Preliminary... the Hydrogen Energy California's (HECA) Integrated Gasification Combined Cycle Project, which would...

  17. Integrated mined-area reclamation and land use planning. Volume 3A. A case study of surface mining and reclamation planning: South Boulder Creek Park Project, Sand and Gravel Operations, Boulder, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, L R; Perry, A O; LaFevers, J R

    1977-02-01

    This case study details reclamation planning for the Flatiron Companies' South Boulder Creek Park Project in Boulder, Colorado. The site contains a deposit of high-quality sand and gravel considered to be one of the best and largest known deposits of aggregate materials in the Front Range area. The aggregate deposit is located in a highly visible site just off the Denver-Boulder Turnpike at the entrance to the city from Denver, and adjacent to a residential portion of the city. In order to make maximum use of pre-mining planning, as a tool for resolving a conflict over the company's proposed operation, an extensive cooperative planning effort was initiated. This included the preparation of an environmental impact assessment, numerous public hearings, operating and reclamation plan review by city authorities, annexation of the site to the city, and the granting of a scenic easement on the property to the city for the development of a regional recreation park. A suite of contractual agreements was worked out among Flatiron Companies, the City of Boulder, the Colorado Open Lands Foundation, and the Federal Bureau of Outdoor Recreation. The purpose of this case study is to allow the planner to gain insight into the procedures, possibilities, and constraints involved in premining planning in a cooperative situation.

  18. Integration of Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2011-01-01

    Practical industrial problems are becoming increasingly complex, involving more participants, and requiring more efficient and precise solutions, leading to the development of new tools, technologies, and knowledge. Solving current industrial problems requires cross-disciplinary knowledge and approaches (Guinan et al., 1998; Ho and Tang, 2009; Kickul et al., 2011). The aim of the Journal of Engineering, Project, and Production Management (EPPM-Journal) is to advance the cross-disciplinary eng...

  19. Projections of leaf area index in earth system models

    Science.gov (United States)

    Mahowald, Natalie; Lo, Fiona; Zheng, Yun; Harrison, Laura; Funk, Chris; Lombardozzi, Danica; Goodale, Christine

    2016-03-01

    The area of leaves in the plant canopy, measured as leaf area index (LAI), modulates key land-atmosphere interactions, including the exchange of energy, moisture, carbon dioxide (CO2), and other trace gases and aerosols, and is therefore an essential variable in predicting terrestrial carbon, water, and energy fluxes. Here our goal is to characterize the LAI projections from the latest generation of earth system models (ESMs) for the Representative Concentration Pathway (RCP) 8.5 and RCP4.5 scenarios. On average, the models project increases in LAI in both RCP8.5 and RCP4.5 over most of the globe, but also show decreases in some parts of the tropics. Because of projected increases in variability, there are also more frequent periods of low LAI across broad regions of the tropics. Projections of LAI changes varied greatly among models: some models project very modest changes, while others project large changes, usually increases. Modeled LAI typically increases with modeled warming in the high latitudes, but often decreases with increasing local warming in the tropics. The models with the most skill in simulating current LAI in the tropics relative to satellite observations tend to project smaller increases in LAI in the tropics in the future compared to the average of all the models. Using LAI projections to identify regions that may be vulnerable to climate change presents a slightly different picture than using precipitation projections, suggesting LAI may be an additional useful tool for understanding climate change impacts. Going forward, users of LAI projections from the CMIP5 ESMs evaluated here should be aware that model outputs do not exhibit clear-cut relationships to vegetation carbon and precipitation. Our findings underscore the need for more attention to LAI projections, in terms of understanding the drivers of projected changes and improvements to model skill.

  20. The integrated nitrous oxide and methane grassland project

    Energy Technology Data Exchange (ETDEWEB)

    Leffelaar, P.A.; Langeveld, C.A.; Hofman, J.E.; Segers, R.; Van den Pol-van Dasselaar, A.; Goudriaan, J.; Rabbinge, R.; Oenema, O. [Department of Theoretical Production Ecology, Wageningen Agricultural University, Wageningen (Netherlands)

    2000-07-01

    The integrated nitrous oxide (N{sub 2}O) and methane (CH{sub 4}) grassland project aims to estimate and explain emissions of these greenhouse gases from two ecosystems, namely drained agricultural peat soil under grass at the experimental farm Zegveld and undrained peat in the nature preserve Nieuwkoopse Plassen, both Netherlands. Peat soils were chosen because of their expected considerable contribution to the greenhouse gas budget considering the prevailing wet and partial anaerobic conditions. The emission dynamics of these ecosystems are considered representatives of large peat areas because the underlying processes are rather general and driven by variables like organic matter characteristics, water and nutrient conditions and type of vegetation. The research approach comprises measurements and modelling at different integration levels relating to the microbiology of the production and consumption of N{sub 2}O and CH{sub 4} (laboratory studies), their movement through peat soil (rhizolab and field studies), and the resulting fluxes (field studies). Typical emissions from drained soil were 15-40 kg ha{sup -1} y{sup -1} N{sub 2}O and virtually zero for CH{sub 4}. The undrained soil in the nature preserve emitted 100-280 kg ha{sup -1} y{sup -1} CH{sub 4}, and probably little N{sub 2}O. The process knowledge, collected and partly integrated in the models, helps to explain these data. For example, the low methane emission from drained peat can more coherently be understood and extrapolated because: (1) upper soil layers are aerobic, thus limiting methane production and stimulating methane oxidation, (2) absence of aerenchymatous roots of wetland plants that connect deeper anaerobic soil layers where methane is produced to the atmosphere and supply labile carbon, (3) a low methane production potential in deep layers due to the low decomposability of organic matter, and (4) long anaerobic periods needed in the topsoil to develop a methane production potential. This

  1. IMPRESS Integrated Project-An overview paper

    Energy Technology Data Exchange (ETDEWEB)

    Jarvis, D.J. [European Space Agency-ESA/ESTEC, Physical Science Unit, Directorate of Human Spaceflight, Microgravity and Exploration, Keplerlaan 1, 2201 AZ Noordwijk (Netherlands)]. E-mail: david.john.jarvis@esa.int; Voss, D. [European Space Agency-ESA/ESTEC, Physical Science Unit, Directorate of Human Spaceflight, Microgravity and Exploration, Keplerlaan 1, 2201 AZ Noordwijk (Netherlands)

    2005-12-15

    IMPRESS is an acronym for Intermetallic Materials Processing in Relation to Earth and Space Solidification. This project was selected by the European Commission and recently started in November 2004. The main scientific objective of IMPRESS is to gain a better understanding of the links between materials processing routes, structure and final properties of intermetallic alloys. Technically speaking, the project aims to develop and test two distinct prototypes based on intermetallic materials, namely gas turbine blades and Raney-type catalytic powder. Numerous material processing routes are being explored within the project with a strong emphasis on solidification. For turbine blade manufacturing, the principal processes under study are tilt casting, counter-gravity casting and centrifugal casting. For catalytic powder production, the focus is placed on gas atomisation and vapour condensation processes. IMPRESS combines a wide range of fundamental studies of solidification both on ground and in space, as well as industrial process development. This paper will describe some of the different facets related to solidification.

  2. Path integral in area tensor Regge calculus and complex connections

    International Nuclear Information System (INIS)

    Euclidean quantum measure in Regge calculus with independent area tensors is considered using example of the Regge manifold of a simple structure. We go over to integrations along certain contours in the hyperplane of complex connection variables. Discrete connection and curvature on classical solutions of the equations of motion are not, strictly speaking, genuine connection and curvature, but more general quantities and, therefore, these do not appear as arguments of a function to be averaged, but are the integration (dummy) variables. We argue that upon integrating out the latter the resulting measure can be well-defined on physical hypersurface (for the area tensors corresponding to certain edge vectors, i.e. to certain metric) as positive and having exponential cutoff at large areas on condition that we confine ourselves to configurations which do not pass through degenerate metrics

  3. Enhancing integrative motivation: The Japanese-American Collaborative Learning Project

    Directory of Open Access Journals (Sweden)

    Fumie Kato

    2016-12-01

    Full Text Available The Collaborative Learning Project is a language exchange program in which American and Japanese university students have the opportunity to interact with native speakers over the course of a three-week period. This paper reports the outcomes of the Collaborative Learning Project in terms of its effectiveness in fulfilling student expectations and their integrative motivation, i.e. social and cultural motivation. Using quantitative and qualitative data, this research includes the first project (2012 as a preliminary study, and the second project (2013 as the basis of the formative assessment. In their responses to questionnaires, the majority of the students reported that the program fulfilled their expectations and fostered their integrative motivation. After participating in the project, the participants were motivated to continue learning Japanese and seemed to be more interested in the study abroad program/studying abroad.

  4. Successful integration of fast track projects into turnarounds

    Energy Technology Data Exchange (ETDEWEB)

    Williams, J. Patrick; Loureiro, Ramon C. [KBC Advanced Technologies, Surrey (United Kingdom)

    2012-07-01

    Fast track projects can provide quick wins and competitive advantage. However, in most cases the implementation of these projects requires a shutdown for installing the necessary tie-ins or integration into an upcoming turnaround (TA). Depending on the nature of the project and complexity of the TA, the integration can be seamless or result in cost or duration overruns and safety incidents. The risk of such overruns and safety incidents increases with the amount of project work to be integrated into the operations, maintenance and inspection schedules to be executed during the TA. The risk further increases with TA size and other factors. If not planned and scheduled properly and in a timely fashion, capital projects, in particular fast track projects trying to take advantage of an upcoming TA, can severely impact both TA performance, and the safety and reliability of the facility until the next opportunity for eliminating the defects introduced during the TA. Successful TAs are those delivered in a safe, on time, on budget manner, and with the quality standards needed for a leak-free start-up and a safe and reliable operation over the next run cycle. This paper discusses the key elements that are required to minimize the TA risks derived from the inclusion of fast track projects and how to establish the cut off criteria to either cancel or defer the project, or delay the TA in order to balance TA scope freeze and the case for compelling economics.(author)

  5. "But now men also listen to the women": women’s-development approach in the Kanchenjunga Conservation Area Project, East Nepal.

    OpenAIRE

    Locher, M.; U. Müller-Böker

    2007-01-01

    The Kanchenjunga Conservation Area Project (KCAP) provides a remarkable example of a gender-sensitive nature conservation project. The KCAP is an Integrated Conservation and Development Project (ICDP) in the mountainous area of East Nepal, jointly managed by the WWF Nepal Program and the Nepalese Department of National Parks and Wildlife Conservation. The project includes a specific women's-development approach. It not only aims at direct integration of women into nature conservation, but als...

  6. Inequalities for the surface area of projections of convex bodies

    OpenAIRE

    Giannopoulos, Apostolos; Koldobsky, Alexander; Valettas, Petros

    2016-01-01

    We provide general inequalities that compare the surface area S(K) of a convex body K in ${\\mathbb R}^n$ to the minimal, average or maximal surface area of its hyperplane or lower dimensional projections. We discuss the same questions for all the quermassintegrals of K. We examine separately the dependence of the constants on the dimension in the case where K is in some of the classical positions or K is a projection body. Our results are in the spirit of the hyperplane problem, with sections...

  7. SOLUTIONS FOR INTEGRATED ADMINISTRATION OF URBAN GREEN AREAS

    Directory of Open Access Journals (Sweden)

    ADINA CLAUDIA NEAMTU

    2014-05-01

    Full Text Available This paper aims to provide an administrative model for green spaces in any geographical area, especially in urban areas. The organizational proposed model also concerns the possibilities to develop new areas with green spaces for both recreation and leisure. Current structures leave much to be desired and, unfortunately, they do not seek to manage the green spaces on types of activities and these activities are not integrated into a unit structure to ensure coordination of operations for maintenance and expansion of these spaces. In the study, for the administrative plan are proposed those necessary changes to create organizational structures needed to implement a coherent strategy and policy to support the development of green space. Given the necessity of an integrated management for urban space, the model proposes solutions to eliminate functional overlaps of the various decision-making bodies by creating a unit of action, together with arrangements for its effective support. Developing effective solutions to managing green spaces for recreation and leisure becomes an obligation for the next period under conditions of increasing green areas arranged as parks and other types of green spaces and hence an increase for the cost of their administration. On the other hand, the paper addresses the issue of integrated management for both, green areas and recreational and leisure facilities existing within the urban areas, by giving more importance and impact for these spaces within communities. In this framework of integrated administration, it is possible to ensure modern leisure amenities in these urban green areas, and on the other hand it is possible to provide a very important prospect of additional revenues for the general budget of the community and also for future budget of planning for new green areas.

  8. Progress Report 16 for the period April-September 1980, and the proceedings of the 16th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, R.R.

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period April to September 1980, is reported in detail. Progress on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering, and operations is described. A report on, and copies of visual presentations made at, the Project Integration Meeting held September 24 and 25, 1980 are included.

  9. Quarterly Report 11 for the Period October 1978 - December 1978 and Proceedings of the 11th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    This report describes progress made by the Low-Cost Solar Array Project during the period October through December 1978. It includes task reports on silicon material processing, large-area silicon sheet development, encapsulation mate3rials testing and development, Project engineering and operations, and manufacturing techniques, plus the steps taken to integrate these efforts. it also includes a report on and copies of viewgraphs presented at the Project Integration Meeting held December 13-14, 1978.

  10. Facilitating students' application of the integral and the area under the curve concepts in physics problems

    Science.gov (United States)

    Nguyen, Dong-Hai

    This research project investigates the difficulties students encounter when solving physics problems involving the integral and the area under the curve concepts and the strategies to facilitate students learning to solve those types of problems. The research contexts of this project are calculus-based physics courses covering mechanics and electromagnetism. In phase I of the project, individual teaching/learning interviews were conducted with 20 students in mechanics and 15 students from the same cohort in electromagnetism. The students were asked to solve problems on several topics of mechanics and electromagnetism. These problems involved calculating physical quantities (e.g. velocity, acceleration, work, electric field, electric resistance, electric current) by integrating or finding the area under the curve of functions of related quantities (e.g. position, velocity, force, charge density, resistivity, current density). Verbal hints were provided when students made an error or were unable to proceed. A total number of 140 one-hour interviews were conducted in this phase, which provided insights into students' difficulties when solving the problems involving the integral and the area under the curve concepts and the hints to help students overcome those difficulties. In phase II of the project, tutorials were created to facilitate students' learning to solve physics problems involving the integral and the area under the curve concepts. Each tutorial consisted of a set of exercises and a protocol that incorporated the helpful hints to target the difficulties that students expressed in phase I of the project. Focus group learning interviews were conducted to test the effectiveness of the tutorials in comparison with standard learning materials (i.e. textbook problems and solutions). Overall results indicated that students learning with our tutorials outperformed students learning with standard materials in applying the integral and the area under the curve

  11. An Integrated Curriculum for Kindergarten/First Grade Children Utilizing Project Approach.

    Science.gov (United States)

    Hsu, Yuehkuei

    An integrated curriculum allows children's learning in all traditional subject areas to occur primarily through projects that the teachers plan and that reflect children's interests. This paper presents a curriculum web on Chinese festivals, specifically, the Chinese New Year, for kindergarten and first grade levels. The paper first presents a…

  12. Western Johore Integrated Agricultural Development Project consultancy services on peat soil management; final report

    NARCIS (Netherlands)

    Staring Centrum, Instituut voor Onderzoek van het LandelijkGebied

    1996-01-01

    Concerns about the rate of subsidence and the level of sustainability of current land use led to this study. Its objectives were: assessing the characteristics of peat soils in the area under the Western Johore Integrated Agricultural Development Project; making recommendations for appropriate land

  13. Progress of the Enhanced Hanford Single Shell Tank (SST) Integrity Project

    International Nuclear Information System (INIS)

    To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. In late 2010, seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement.

  14. Progress of the Enhanced Hanford Single Shell Tank (SST) Integrity Project

    Energy Technology Data Exchange (ETDEWEB)

    Venetz, Theodore J. [Washington River Protection Solutions, Richland, WA (United States); Washenfelder, Dennis J. [Washington River Protection Solutions, Richland, WA (United States); Boomer, Kayle D. [Washington River Protection Solutions, Richland, WA (United States); Johnson, Jeremy M. [USDOE Office of River Protection, Richland, WA (United States); Castleberry, Jim L. [Washington River Protection Solutions, Richland, WA (United States)

    2015-01-07

    To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. In late 2010, seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement.

  15. Xinjiang Integrates Mineral Resources of 11 Major Mining Areas

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    <正>According to reports,from this year,Xinjiang, a large mineral resource province,will implement mineral resource integration of 11 major mining areas involving minerals including coal, iron,copper and bentonite,so as to further adjust the structure of mineral exploitation and optimize the distribution of resources.

  16. Integration of Tactical Departure Scheduling and Traffic Flow Management Project

    Data.gov (United States)

    National Aeronautics and Space Administration — In the ATM Select topic area of Integrated Arrival, Departure and Surface (IADS) planning, this proposal addresses Tactical Departure Scheduling (TDS), which is a...

  17. Freihoelser Forst Local Training Area Demonstration Project: Prescription development and installation

    International Nuclear Information System (INIS)

    The Freiholser Forst Local Training Area (LTA) Rehabilitation Demonstration Project is part of the Integrated Training Area Management program being developed by the US Army Corps of Engineers' Construction Engineering Research Laboratory for the Seventh Army Training Command of the US Army in Europe. The rehabilitation demonstration project was begun in 1987 to develop and demonstrate rapid, cost-effective methods to stabilize the LTA's barren, eroding maneuver areas and make training conditions more realistic. The sandy, infertile, and acidic soils at the LTA are considered the major factor limiting rehabilitation efforts there. The project involves the evaluation of three procedures to revegetate the soils, each incorporating identical methods for preparing the seedbed and a single seed mixture consisting of adapted, native species but using different soil amendments. All three treatments have satisfactorily reestablished vegetation and controlled erosion on the demonstration plots at the LTA, but their costs have varied widely

  18. Area recommendation report for the crystalline repository project: An evaluation

    International Nuclear Information System (INIS)

    An evaluation is given of DOE's recommendation of the Elk River complex in North Carolina for siting the second repository. Twelve recommendations are made including a strong suggestion that the Cherokee Tribe appeal both through political and legal avenues for inclusion as an affected area primarily due to projected impacts upon economy and public health as a consequence of the potential for reduced tourism

  19. Westside Area Career Occupations Project. Evaluation Report 1975-76.

    Science.gov (United States)

    Glur, John

    Evaluation of the Westside Area Career Occupations Project (WACOP) focused on (1) examining what aspects of the Arizona career education effort had the most significant impact on students, and (2) measuring specific outcomes related to the students' knowledge about the world of work, using the Arizona Careers Test. System implementation and…

  20. Underground Test Area Subproject Project Management Plan, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-03

    This Project Management Plan (PMP) describes the manner in which the US Department of Energy Nevada Operations Office (DOE/NV) will manage the Underground Test Area (UGTA) Subproject at the Nevada Test Site (NTS). It provides the basic guidance for implementation and the organizational structure for meeting the UGTA objectives.

  1. Project ASPIRE: Incorporating Integrative Medicine Into Residency Training.

    Science.gov (United States)

    Nawaz, Haq; Via, Christina M; Ali, Ather; Rosenberger, Lisa D

    2015-11-01

    Griffin Hospital, a community hospital affiliated with Yale School of Public Health and Yale School of Medicine, received Health Resources and Services Administration funding to strengthen and improve its combined internal medicine and general preventive medicine residency program by incorporating an integrative medicine curriculum. The purpose of project ASPIRE (Advancing Skills of Preventive medicine residents through Integrative medicine Education, Research and Evaluation) was to create, implement, and evaluate a needs-based, innovative training curriculum in integrative medicine. Through this robust new training, the authors aimed to produce preventive medicine-trained physicians with competencies in integrative medicine to collaboratively work with other integrative medicine practitioners in interdisciplinary teams to provide holistic, patient-centered care. The multifaceted collaborative curriculum was composed of didactics, grand rounds, journal club, objective structured clinical examinations, and two new practicum rotations in integrative medicine. The new practicum rotations included block rotations at the Integrative Medicine Center at Griffin Hospital and the Yale Stress Center. Between 2012 and 2014, three cohorts participated in the curriculum; two of these cohorts included three advanced preventive medicine residents each and the fourth included four residents. Project faculty conducted 14 lectures and journal clubs, and two grand rounds. Six of the ten participating residents (60%) completed integrative medicine clinical rotations. Residents' attitudes toward integrative medicine were evaluated through self-assessment using the Complementary, Alternative, and Integrative Medicine Attitudes Questionnaire; data were analyzed in 2015. This article describes the results of this prospective observational study based on single-institution experience over the course of the 2-year project period.

  2. Project ASPIRE: Incorporating Integrative Medicine Into Residency Training.

    Science.gov (United States)

    Nawaz, Haq; Via, Christina M; Ali, Ather; Rosenberger, Lisa D

    2015-11-01

    Griffin Hospital, a community hospital affiliated with Yale School of Public Health and Yale School of Medicine, received Health Resources and Services Administration funding to strengthen and improve its combined internal medicine and general preventive medicine residency program by incorporating an integrative medicine curriculum. The purpose of project ASPIRE (Advancing Skills of Preventive medicine residents through Integrative medicine Education, Research and Evaluation) was to create, implement, and evaluate a needs-based, innovative training curriculum in integrative medicine. Through this robust new training, the authors aimed to produce preventive medicine-trained physicians with competencies in integrative medicine to collaboratively work with other integrative medicine practitioners in interdisciplinary teams to provide holistic, patient-centered care. The multifaceted collaborative curriculum was composed of didactics, grand rounds, journal club, objective structured clinical examinations, and two new practicum rotations in integrative medicine. The new practicum rotations included block rotations at the Integrative Medicine Center at Griffin Hospital and the Yale Stress Center. Between 2012 and 2014, three cohorts participated in the curriculum; two of these cohorts included three advanced preventive medicine residents each and the fourth included four residents. Project faculty conducted 14 lectures and journal clubs, and two grand rounds. Six of the ten participating residents (60%) completed integrative medicine clinical rotations. Residents' attitudes toward integrative medicine were evaluated through self-assessment using the Complementary, Alternative, and Integrative Medicine Attitudes Questionnaire; data were analyzed in 2015. This article describes the results of this prospective observational study based on single-institution experience over the course of the 2-year project period. PMID:26477907

  3. Project ASPIRE: Incorporating Integrative Medicine Into Residency Training

    OpenAIRE

    Nawaz, Haq; Via, Christina M.; Ali, Ather; Rosenberger, Lisa D.

    2015-01-01

    Griffin Hospital, a community hospital affiliated with Yale School of Public Health and Yale School of Medicine, received Health Resources and Services Administration funding to strengthen and improve its combined internal medicine and general preventive medicine residency program by incorporating an integrative medicine curriculum. The purpose of project ASPIRE (Advancing Skills of Preventive medicine residents through Integrative medicine Education, Research and Evaluation) was to create, i...

  4. Integrating the Projective Transform with Particle Filtering for Visual Tracking

    Directory of Open Access Journals (Sweden)

    Beghdadi A

    2011-01-01

    Full Text Available This paper presents the projective particle filter, a Bayesian filtering technique integrating the projective transform, which describes the distortion of vehicle trajectories on the camera plane. The characteristics inherent to traffic monitoring, and in particular the projective transform, are integrated in the particle filtering framework in order to improve the tracking robustness and accuracy. It is shown that the projective transform can be fully described by three parameters, namely, the angle of view, the height of the camera, and the ground distance to the first point of capture. This information is integrated in the importance density so as to explore the feature space more accurately. By providing a fine distribution of the samples in the feature space, the projective particle filter outperforms the standard particle filter on different tracking measures. First, the resampling frequency is reduced due to a better fit of the importance density for the estimation of the posterior density. Second, the mean squared error between the feature vector estimate and the true state is reduced compared to the estimate provided by the standard particle filter. Third, the tracking rate is improved for the projective particle filter, hence decreasing track loss.

  5. Projected Bioclimatic Change for the San Francisco Bay Area

    Science.gov (United States)

    Torregrosa, A.; Taylor, M.; Flint, L. E.; Flint, A. L.; Weiss, S. B.

    2011-12-01

    Past and future climate data for the San Francisco Bay Area were classified using the Rivas-Martinez (R-M) system to group long-term annual climate averages into categories with biotic significance based on thermotypic and ombrotypic regimes. Bioclimate maps were generated at 270 meter resolution for ten San Francisco Bay Area counties for six 30-year periods from 1911 to 2100 which include the historical 1) 1911-1940, 2) 1941-1970, 3) 1971-2000, and future 4) 2011-2040, 5) 2041-2070, and 6) 2071-2100. Historic averages were generated from PRISM climate data. Future climate projections were generated from two IPCC-based future scenarios (A2 and B1) and two coupled atmosphere-ocean general circulation models (NOAA Geophysical Fluid Dynamics Laboratory and the Parallel Climate Model). Strong congruence was found among the boundaries for historic bioclimates and current vegetation types. However, future scenarios had varying patterns of losses and gains in bioclimate classes and these tracked mesoclimate gradients. Comparisons between projected bioclimatic categories and modeled future climatic water deficit show strong correspondence except in zones of deep alluvial deposits. Maps show areas of bioclimatic stability, e.g. areas that did not change under any future projection, versus areas with significant bioclimatic shifts in all future scenarios. These analyses and maps will be useful for assessing natural resource vulnerability to climate change and natural resource conservation-based climate adaptation decisions.

  6. Project Integration Architecture: Inter-Application Propagation of Information

    Science.gov (United States)

    Jones, William Henry

    2005-01-01

    A principal goal of the Project Integration Architecture (PIA) is to facilitate the meaningful inter-application transfer of application-value-added information. Such exchanging applications may be largely unrelated to each other except through their applicability to an overall project; however, the PIA effort recognizes as fundamental the need to make such applications cooperate despite wide disparaties either in the fidelity of the analyses carried out, or even the disciplines of the analysis. This paper discusses the approach and techniques applied and anticipated by the PIA project in treating this need.

  7. An Overview of the JPSS Ground Project Algorithm Integration Process

    Science.gov (United States)

    Vicente, G. A.; Williams, R.; Dorman, T. J.; Williamson, R. C.; Shaw, F. J.; Thomas, W. M.; Hung, L.; Griffin, A.; Meade, P.; Steadley, R. S.; Cember, R. P.

    2015-12-01

    The smooth transition, implementation and operationalization of scientific software's from the National Oceanic and Atmospheric Administration (NOAA) development teams to the Join Polar Satellite System (JPSS) Ground Segment requires a variety of experiences and expertise. This task has been accomplished by a dedicated group of scientist and engineers working in close collaboration with the NOAA Satellite and Information Services (NESDIS) Center for Satellite Applications and Research (STAR) science teams for the JPSS/Suomi-NPOES Preparatory Project (S-NPP) Advanced Technology Microwave Sounder (ATMS), Cross-track Infrared Sounder (CrIS), Visible Infrared Imaging Radiometer Suite (VIIRS) and Ozone Mapping and Profiler Suite (OMPS) instruments. The presentation purpose is to describe the JPSS project process for algorithm implementation from the very early delivering stages by the science teams to the full operationalization into the Interface Processing Segment (IDPS), the processing system that provides Environmental Data Records (EDR's) to NOAA. Special focus is given to the NASA Data Products Engineering and Services (DPES) Algorithm Integration Team (AIT) functional and regression test activities. In the functional testing phase, the AIT uses one or a few specific chunks of data (granules) selected by the NOAA STAR Calibration and Validation (cal/val) Teams to demonstrate that a small change in the code performs properly and does not disrupt the rest of the algorithm chain. In the regression testing phase, the modified code is placed into to the Government Resources for Algorithm Verification, Integration, Test and Evaluation (GRAVITE) Algorithm Development Area (ADA), a simulated and smaller version of the operational IDPS. Baseline files are swapped out, not edited and the whole code package runs in one full orbit of Science Data Records (SDR's) using Calibration Look Up Tables (Cal LUT's) for the time of the orbit. The purpose of the regression test is to

  8. Water supply project feasibilities in fringe areas of Kolkata, India

    Directory of Open Access Journals (Sweden)

    K. Dutta Roy

    2010-09-01

    Full Text Available Water supply management to the peri-urban areas of the developing world is a complex task due to migration, infrastructure, paucity of fund etc. A cost-benefit methodology particularly suitable for the peri-urban areas has been developed for the city of Kolkata, India. The costs are estimated based on a neural network estimate. The water quality of the area is estimated from samples and a water quality index has been prepared. A questionnaire survey in the area has been conducted for relevant information like income, awareness and willingness to pay for safe drinking water. A factor analysis has been conducted for distinguishing the important factors of the survey and subsequent multiple regressions have been conducted for finding the relationships for the willingness to pay. A system dynamics model has been conducted to estimate the trend of increase of willingness to pay with the urbanizations in the peri-urban areas. A cost benefit analysis with the impact of time value of money has been executed. The risk and uncertainty of the project is investigated by Monte Carlos simulation and tornado diagrams. It has been found that the projects that are normally rejected in standard cost benefit analysis would be accepted if the impacts of urbanizations in the peri-urban areas are considered.

  9. Electric Vehicle Fleet Integration in the Danish EDISON Project

    DEFF Research Database (Denmark)

    Andersen, Peter Bach; Træholt, Chresten; Marra, Francesco;

    2010-01-01

    The Danish EDISON project has been launched to investigate how a large fleet of electric vehicles (EVs) can be integrated in a way that supports the electric grid while benefitting both the individual car owners and society as a whole through reductions in CO2 emissions. The consortium partners...

  10. Great Lakes Offshore Wind Project: Utility and Regional Integration Study

    Energy Technology Data Exchange (ETDEWEB)

    Loparo, Kenneth A.; Sajadi, Amir; D' Aquila, Robert; Clark, Kara; Waligorski, Joseph; Baker, Scott

    2016-06-30

    This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods to quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.

  11. Integrated Methodology for Estimating Water Use in Mediterranean Agricultural Areas

    OpenAIRE

    Zalidis, George C.; Eleftherios Stavrinos; Silleos, George N.; Yann Chemin; Ines Cherif; Thomas K. Alexandridis

    2009-01-01

    Agricultural use is by far the largest consumer of fresh water worldwide, especially in the Mediterranean, where it has reached unsustainable levels, thus posing a serious threat to water resources. Having a good estimate of the water used in an agricultural area would help water managers create incentives for water savings at the farmer and basin level, and meet the demands of the European Water Framework Directive. This work presents an integrated methodology for estimating water use in Med...

  12. 300 Area Integrated Field-Scale Subsurface Research Challenge (IFRC) Field Site Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Freshley, Mark D.

    2008-12-31

    Pacific Northwest National Laboratory (PNNL) has established the 300 Area Integrated Field-Scale Subsurface Research Challenge (300 Area IFRC) on the Hanford Site in southeastern Washington State for the U.S. Department of Energy’s (DOE) Office of Biological and Environmental Research (BER) within the Office of Science. The project is funded by the Environmental Remediation Sciences Division (ERSD). The purpose of the project is to conduct research at the 300 IFRC to investigate multi-scale mass transfer processes associated with a subsurface uranium plume impacting both the vadose zone and groundwater. The management approach for the 300 Area IFRC requires that a Field Site Management Plan be developed. This is an update of the plan to reflect the installation of the well network and other changes.

  13. Energy secretary's priorities include San Francisco area research projects

    CERN Multimedia

    Widener, A

    2003-01-01

    "Bay Area research labs got a big boost Monday when the Secretary of Energy unveiled his priorities for major research projects his agency hopes to fund over the next two decades. Among the agency's 28 top priorities are a major computer expansion and an experiment examining the expanding universe that could be housed at Lawrence Berkeley Lab and a powerful X-ray laser planned for the Stanford Linear Accelerator Center" (1 page).

  14. Freihoelser Forst Local Training Area rehabilitation project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Hinchman, R.R.; Zellmer, S.D.; Johnson, D.O.; Severinghaus, W.D.; Brent, J.J. [Army Construction Engineering Research Lab., Champaign, IL (United States). Environmental Div.

    1991-12-01

    Intensive and continued use of the Freihoelser Forst Local Training Area (LTA) for military training activities had resulted in serious environmental problems, exemplified by a lack of vegetative cover and severe erosion by water and wind. The project`s goal was to develop and demonstrate rapid, cost-effective methods to stabilize the LTA`s barren, eroding maneuver areas and make training conditions more realistic. The major factors limiting rehabilitation efforts were the sandy, infertile, and acidic soils. The project was conducted in two phases. Phase I demonstrated and evaluated three separate rehabilitation treatments ranging in cost from moderate to expensive. Each treatment used a different type of soil amendment (fertilizer and straw, compost, or chicken manure), but all used identical seedbed preparation methods and seed mixtures. Phase I was conducted on relatively small replicated plots and was monitored three times during each growing season. All three treatments satisfactorily reestablished vegetation and controlled erosion. Because of their small size, the Phase I demonstration plots had only a minor stabilizing effect on the erosion problems of the LTA as a whole. The Phase II treatment was based on lessons teamed from Phase I and from other revegetation projects in Germany. Phase II revegetated a large area of the LTA, which included nearly all of the most severely disturbed land. Phase II, which was monitored in the same way as Phase I but for a shorter period of time, was highly successful in stabilizing most areas treated. The revegetation plant community was dominated by native grasses and legumes that stabilized the loose, sandy soils and improved the training realism of a major portion of the LTA.

  15. Integrated monitoring plan for the Hanford groundwater monitoring project

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, M.J.; Dresel, P.E.; McDonald, J.P.; Mercer, R.B.; Newcomer, D.R.; Thornton, E.C.

    1998-09-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy (DOE) manages these activities through the Hanford Groundwater Monitoring Project (groundwater project), which is the responsibility of Pacific Northwest National Laboratory. The groundwater project does not include all of the monitoring to assess performance of groundwater remediation or all monitoring associated with active facilities. This document is the first integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; other, established monitoring plans by reference; and a master well/constituent/frequency matrix for the entire Hanford Site.

  16. MUNI Ways and Structures Building Integrated Solar Membrane Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Randall

    2014-07-03

    The initial goal of the MUNI Ways and Structures Building Integrated Solar Membrane Installation Project was for the City and County of San Francisco (CCSF) to gain experience using the integrated higher efficiency solar photovoltaic (PV) single-ply membrane product, as it differs from the conventional, low efficiency, thin-film PV products, to determine the feasibility of success of larger deployment. As several of CCSF’s municipal rooftops are constrained with respect to weight restrictions, staff of the Energy Generation Group of the San Francisco Public Utilities Commission (SFPUC) proposed to install a solar PV system using single-ply membrane The installation of the 100 kW (DC-STC) lightweight photo voltaic (PV) system at the MUNI Ways and Structures Center (700 Pennsylvania Ave., San Francisco) is a continuation of the commitment of the City and County of San Francisco (CCSF) to increase the pace of municipal solar development, and serve its municipal facilities with clean renewable energy. The fourteen (14) solar photovoltaic systems that have already been installed at CCSF municipal facilities are assisting in the reduction of fossil-fuel use, and reduction of greenhouse gases from fossil combustion. The MUNI Ways & Structures Center roof has a relatively low weight-bearing capacity (3.25 pounds per square foot) and use of traditional crystalline panels was therefore rejected. Consequently it was decided to use the best available highest efficiency Building-Integrated PV (BIPV) technology, with consideration for reliability and experience of the manufacturer which can meet the low weight-bearing capacity criteria. The original goal of the project was to provide an opportunity to monitor the results of the BIPV technology and compare these results to other City and County of San Francisco installed PV systems. The MUNI Ways and Structures Center was acquired from the Cookson Doors Company, which had run the Center for many decades. The building was

  17. Architectures of adaptive integration in large collaborative projects

    Directory of Open Access Journals (Sweden)

    Lois Wright Morton

    2015-12-01

    Full Text Available Collaborations to address complex societal problems associated with managing human-natural systems often require large teams comprised of scientists from multiple disciplines. For many such problems, large-scale, transdisciplinary projects whose members include scientists, stakeholders, and other professionals are necessary. The success of very large, transdisciplinary projects can be facilitated by attending to the diversity of types of collaboration that inevitably occur within them. As projects progress and evolve, the resulting dynamic collaborative heterogeneity within them constitutes architectures of adaptive integration (AAI. Management that acknowledges this dynamic and fosters and promotes awareness of it within a project can better facilitate the creativity and innovation required to address problems from a systems perspective. In successful large projects, AAI (1 functionally meets objectives and goals, (2 uses disciplinary expertise and concurrently bridges many disciplines, (3 has mechanisms to enable connection, (4 delineates boundaries to keep focus but retain flexibility, (5 continuously monitors and adapts, and (6 encourages project-wide awareness. These principles are illustrated using as case studies three large climate change and agriculture projects funded by the U.S. Department of Agriculture-National Institute of Food and Agriculture.

  18. Development of generic key performance indicators for PMBOK® using a 3D project integration model

    Directory of Open Access Journals (Sweden)

    Craig Langston

    2013-12-01

    Full Text Available Since Martin Barnes’ so-called ‘iron triangle’ circa 1969, much debate has occurred over how best to describe the fundamental constraints that underpin project success. This paper develops a 3D project integration model for PMBOK® comprising core constraints of scope, cost, time and risk as a basis to propose six generic key performance indicators (KPIs that articulate successful project delivery. These KPIs are defined as value, efficiency, speed, innovation, complexity and impact and can each be measured objectively as ratios of the core constraints. An overall KPI (denoted as s3/ctr is also derived. The aim in this paper is to set out the case for such a model and to demonstrate how it can be employed to assess the performance of project teams in delivering successful outcomes at various stages in the project life cycle. As part of the model’s development, a new PMBOK® knowledge area concerning environmental management is advanced.

  19. General principles for integrating geoheritage conservation in protected area management

    Science.gov (United States)

    Gordon, John E.; Crofts, Roger

    2015-04-01

    Development of more integrated approaches to the management of protected areas requires not only the protection of geosites, but also the effective application of geoconservation principles that apply more widely to the sustainable management of natural systems. Key guiding principles include: working with natural processes; managing natural systems and processes in a spatially integrated manner; accepting the inevitability of natural change; considering the responses of geomorphological processes to the effects of global climate change; recognising the sensitivity of natural systems and managing them within the limits of their capacity to absorb change; basing conservation management of active systems on a sound understanding of the underlying physical processes; making provision for managing visitors at sensitive sites; and acknowledging the interdependency of geodiversity and biodiversity management. As well as recognising the value of geoheritage in its own right, a more integrated approach to conservation across the full range of IUCN Protected Area Management Categories would benefit both biodiversity and geodiversity, through application of the concept of 'conserving nature's stage' and adopting an ecosystem approach.

  20. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  1. Integrating service excellence in a CHF clinical pathway pilot project.

    Science.gov (United States)

    Hahn, Joyce; Bishop, Geri; Fennell, Lenora

    2002-01-01

    The complex dynamics of the current healthcare environment require healthcare delivery systems to become cost effective and quality driven. Educated healthcare consumers expect superior service and timely responses to their needs. For one healthcare system, customer expectations were an integral part of designing, implementing, and measuring the service components of congestive heart failure pathway outcomes. Service excellence can influence overall clinical outcomes when measured by consumer awareness and patient satisfaction. The inclusion of service excellence as an intrinsic piece of the organizational strategic plan laid the groundwork for this integrated pilot project. PMID:11942156

  2. Integrating service excellence in a CHF clinical pathway pilot project.

    Science.gov (United States)

    Hahn, Joyce; Bishop, Geri; Fennell, Lenora

    2002-01-01

    The complex dynamics of the current healthcare environment require healthcare delivery systems to become cost effective and quality driven. Educated healthcare consumers expect superior service and timely responses to their needs. For one healthcare system, customer expectations were an integral part of designing, implementing, and measuring the service components of congestive heart failure pathway outcomes. Service excellence can influence overall clinical outcomes when measured by consumer awareness and patient satisfaction. The inclusion of service excellence as an intrinsic piece of the organizational strategic plan laid the groundwork for this integrated pilot project.

  3. Temperature profiles from expendable bathythermograph (XBT) casts from the NOAA Ship OCEANOGRAPHER in the TOGA Area - Pacific (30 N to 30 S) in support of the Integrated Global Ocean Services System (IGOSS) project from 05 March 1981 to 19 March 1981 (NODC Accession 8100629)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — XBT data were collected from the NOAA Ship OCEANOGRAPHER in support of the Integrated Global Ocean Services System (IGOSS) project. Data were collected by the...

  4. Integration, Configuration and Coordination: from Project to Reality, at CERN

    CERN Document Server

    Barberan Marin, Maria; Bernardini, Marzia; Birtwistle, Thomas; Chemli, Samy; Corso, Jean-Pierre; Coupard, Julie; Foraz, Katy; Grillot, Serge; Muttoni, Yvon; Perrot, Anne-Laure

    2016-01-01

    The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. At each stage of the project the support of the three teams evolves, to provide the adequate support in the preparation phase and during the technical stops and long shutdowns. The formal roles and the processes used to govern the interaction of the Integration, Configuration and Coordination teams, and their relation to the project teams during the preparation and implementation phases, for activities to be performed in LHC and its injector chain are described and discussed.

  5. Integrated project delivery methods for energy renovation of social housing

    Directory of Open Access Journals (Sweden)

    Tadeo Baldiri Salcedo Rahola

    2015-11-01

    renting them. As such, SHOs are used to dealing with renovations on a professional basis. The limited financial capacity of SHOs to realise energy renovations magnifies the importance of improving process performance in order to get the best possible outcomes. In the last 30 years numerous authors have addressed the need to improve the performance of traditional construction processes via alternative project delivery methods. However, very little is known about the specifics of renovations processes for social housing, the feasibility of applying innovative construction management methods and the consequences for the process, for the role of all the actors involved and for the results of the projects.The aim of this study is to provide an insight into the project delivery methods available for SHOs when they are undertaking energy renovation projects and to evaluate how these methods could facilitate the achievement of a higher process performance. The main research question is:How can Social Housing Organisations improve the performance of energy renovation processes using more integrated project delivery methods?The idea of a PhD thesis about social housing renovation processes originated from the participation of TU Delft as research partner in the Intelligent Energy Europe project SHELTER1 which was carried out between 2010 and 2013. The aim of the SHELTER project was to promote and facilitate the use of new models of cooperation, inspired by integrated design, for the energy renovation of social housing. The SHELTER project was a joint effort between six social housing organisations (Arte Genova, Italy; Black Country Housing Group, United Kingdom; Bulgarian Housing Association, Bulgaria; Dynacité, France; Logirep, France and Société Wallonne du Logement, Belgium, three European professional federations based in Brussels (Architects Council of Europe, Cecodhas Housing Europe and European Builders Confederation and one research partner (Delft University of

  6. Leaf Area Index in Earth System Models: evaluation and projections

    Directory of Open Access Journals (Sweden)

    N. Mahowald

    2015-04-01

    Full Text Available The amount of leaves in a plant canopy (measured as leaf area index, LAI modulates key land–atmosphere interactions, including the exchange of energy, moisture, carbon dioxide (CO2, and other trace gases, and is therefore an essential variable in predicting terrestrial carbon, water, and energy fluxes. The latest generation of Earth system models (ESMs simulate LAI, as well as provide projections of LAI in the future to improve simulations of biophysical and biogeochemical processes, and for use in climate impact studies. Here we use satellite measurements of LAI to answer the following questions: (1 are the models accurately simulating the mean LAI spatial distribution? (2 Are the models accurately simulating the seasonal cycle in LAI? (3 Are the models correctly simulating the processes driving interannual variability in the current climate? And finally based on this analysis, (4 can we reduce the uncertainty in future projections of LAI by using each model's skill in the current climate? Overall, models are able to capture some of the main characteristics of the LAI mean and seasonal cycle, but all of the models can be improved in one or more regions. Comparison of the modeled and observed interannual variability in the current climate suggested that in high latitudes the models may overpredict increases in LAI based on warming temperature, while in the tropics the models may overpredict the negative impacts of warming temperature on LAI. We expect, however, larger uncertainties in observational estimates of interannual LAI compared to estimates of seasonal or mean LAI. Future projections of LAI by the ESMs are largely optimistic, with only limited regions seeing reductions in LAI. Future projections of LAI in the models are quite different, and are sensitive to climate model projections of precipitation. They also strongly depend on the amount of carbon dioxide fertilization in high latitudes. Based on comparisons between model simulated

  7. Large-area smart glass and integrated photovoltaics

    Energy Technology Data Exchange (ETDEWEB)

    Lampert, C.M. [Star Science, 8730 Water Road, Cotati, CA 94931-4252 (United States)

    2003-04-01

    Several companies throughout the world are developing dynamic glazing and large-area flat panel displays. University and National Laboratory groups are researching new materials and processes to improve these products. The concept of a switchable glazing for building and vehicle application is very attractive. Conventional glazing only offers fixed transmittance and control of energy passing through it. Given the wide range of illumination conditions and glare, a dynamic glazing with adjustable transmittance offers the best solution. Photovoltaics can be integrated as power sources for smart windows. In this way a switchable window could be a completely stand alone smart system. A new range of large-area flat panel display including light-weight and flexible displays are being developed. These displays can be used for banner advertising, dynamic pricing in stores, electronic paper, and electronic books, to name only a few applications. This study covers selected switching technologies including electrochromism, suspended particles, and encapsulated liquid crystals.

  8. An integrated approach for risk assessment in port projects

    Directory of Open Access Journals (Sweden)

    S. Meysam Mousavi

    2014-10-01

    Full Text Available Port risk management is utilized to describe a sequence of the analysis and management activities focused on creating specific responses to inherent risks in port projects. Risk assessment is taken into account in the projects; however, it is still comparatively neglected for the assessment process with non-parametric resampling techniques and interval analysis. The required data and experts' judgments in developing countries are often small. Hence, traditional approaches cannot assist such problems remarkably. An integrated approach is proposed in this paper for risk assessment in port projects for the use of the bootstrap and interval computations. In an application example, the proposed approach is investigated in detail. Finally, the traditional and proposed approaches are compared.

  9. Managing Risks in Distributed Software Projects: An Integrative Framework

    DEFF Research Database (Denmark)

    Persson, John Stouby; Mathiassen, Lars; Boeg, Jesper;

    2009-01-01

    techniques into an integrative framework for managing risks in distributed contexts. Subsequent implementation of a Web-based tool helped us refine the framework based on empirical evaluation of its practical usefulness.We conclude by discussing implications for both research and practice.......Software projects are increasingly geographically distributed with limited face-to-face interaction between participants. These projects face particular challenges that need carefulmanagerial attention. While risk management has been adopted with success to address other challenges within software...... development, there are currently no frameworks available for managing risks related to geographical distribution. On this background, we systematically review the literature on geographically distributed software projects. Based on the review, we synthesize what we know about risks and risk resolution...

  10. Integrating chemical engineering fundamentals in the capstone process design project

    DEFF Research Database (Denmark)

    von Solms, Nicolas; Woodley, John; Johnsson, Jan Erik;

    2010-01-01

    of the CDIO standards – especially standard 3 – Integrated Curriculum - means that the course projects must draw on competences provided in other subjects which the students are taking in parallel with Process Design – specifically Process Control and Reaction Engineering. In each semester of the B.......Eng. education, one course is designated the “project” course, which should draw on material learned in parallel courses. In the 6th semester, Process Design is the project course. Process Control and Reaction Engineering are then incorporated into the final plant design project. Specifically, almost all......All B.Eng. courses offered at the Technical University of Denmark (DTU) must now follow CDIO standards. The final “capstone” course in the B.Eng. education is Process Design, which for many years has been typical of chemical engineering curricula worldwide. The course at DTU typically has about 30...

  11. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    Energy Technology Data Exchange (ETDEWEB)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C. [and others

    1997-01-15

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables.

  12. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  13. Ground-water resources of Riverton irrigation project area, Wyoming

    Science.gov (United States)

    Morris, Donald Arthur; Hackett, O.M.; Vanlier, K.E.; Moulder, E.A.; Durum, W.H.

    1959-01-01

    The Riverton irrigation project area is in the northwestern part of the Wind River basin in west-central Wyoming. Because the annual precipitation is only about 9 inches, agriculture, which is the principal occupation in the area, is dependent upon irrigation. Irrigation by surface-water diversion was begum is 1906; water is now supplied to 77,716 acres and irrigation has been proposed for an additional 31,344 acres. This study of the geology and ground-water resources of the Riverton irrigation project, of adjacent irrigated land, and of nearby land proposed for irrigation was begun during the summer of 1948 and was completed in 1951. The purpose of the investigation was to evaluate the ground-water resources of the area and to study the factors that should be considered in the solution of drainage and erosional problems within the area. The Riverton irrigation project area is characterized by flat to gently sloping stream terraces, which are flanked by a combination of badlands, pediment slopes, and broad valleys. These features were formed by long-continued erosion in an arid climate of the essentially horizontal, poorly consolidated beds of the Wind River formation. The principal streams of the area flow south-eastward. Wind River and Fivemile Creek are perennial streams and the others are intermittent. Ground-water discharge and irrigation return flow have created a major problem in erosion control along Fivemile Creek. Similar conditions might develop along Muddy and lower Cottonwood Creeks when land in their drainage basins is irrigated. The bedrock exposed in the area ranges in age from Late Cretaceous to early Tertiary (middle Eocene). The Wind River formation of early and middle Eocene age forms the uppermost bedrock formation in the greater part of the area. Unconsolidated deposits of Quaternary age, which consist of terrace gravel, colluvium, eolian sand and silt. and alluvium, mantle the Wind River formation in much of the area. In the irrigated parts

  14. Remote and terrestrial ground monitoring techniques integration for hazard assessment in mountain areas

    Science.gov (United States)

    Chinellato, Giulia; Kenner, Robert; Iasio, Christian; Mair, Volkmar; Mosna, David; Mulas, Marco; Phillips, Marcia; Strada, Claudia; Zischg, Andreas

    2014-05-01

    In high mountain regions the choice of appropriate sites for infrastructure such as roads, railways, cable cars or hydropower dams is often very limited. In parallel, the increasing demand for supply infrastructure in the Alps induces a continuous transformation of the territory. The new role played by the precautionary monitoring in the risk governance becomes fundamental and may overcome the modeling of future events, which represented so far the predominant approach to these sort of issues. Furthermore the consequence of considering methodologies alternative to those more exclusive allow to reduce costs and increasing the frequency of measurements, updating continuously the cognitive framework of existing hazard condition in most susceptible territories. The scale factor of the observed area and the multiple purpose of such regional ordinary surveys make it convenient to adopt Radar Satellite-based systems, but they need to be integrated with terrestrial systems for validation and eventual early warning purposes. Significant progress over the past decade in Remote Sensing (RS), Proximal Sensing and integration-based sensor networks systems now provide technologies, that allow to implement monitoring systems for ordinary surveys of extensive areas or regions, which are affected by active natural processes and slope instability. The Interreg project SloMove aims to provide solutions for such challenges and focuses on using remote sensing monitoring techniques for the monitoring of mass movements in two test sites, in South Tyrol (Italy) and in Grisons Canton (Switzerland). The topics faced in this project concern mass movements and slope deformation monitoring techniques, focusing mainly on the integration of multi-temporal interferometry, new generation of terrestrial technologies for differential digital terrain model elaboration provided by laser scanner (TLS), and GNSS-based topographic surveys, which are used not only for validation purpose, but also for

  15. Minimal Technologies Application Project, Hohenfels Training Area, Germany: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.; Hinchman, R.R.; Johnson, D.O. [Argonne National Lab., IL (United States). Energy Systems Div.; Severinghaus, W.D. [Corps of Engineers, Champaign, IL (United States); Brent, J.J. [Army Construction Engineering Research Lab., Champaign, IL (United States)

    1991-12-01

    At the US Army Hohenfels Training Area in Germany, more than 30 years of continuous and intensive tactical training has caused extensive environmental damage because of the loss of vegetative cover and accelerated soil erosion. A project was conducted to evaluate the cost-effectiveness and relative benefits of various revegetation procedures. These procedures involved amendment and seedbed preparation options that were combined with three different durations of site closure. The point-intercept method was used to measure the types and amounts of vegetation established and changes in the vegetative community. Over three growing seasons, applications of fertilizer and seed increased the percent grass, legume, and total vegetative cover. The duration of site closure had no influence on the types or amounts of ground cover established. Materials made up only 10% of the total cost of the fertilization and seeding operations. The results of the research indicate that less expensive methods of amendment application should be evaluated. The data also show that site closure is not practical, economical, or necessary. The results of this project suggest that a regular maintenance program consisting of seeding and fertilization is required to maintain adequate vegetative cover and control erosion on tactical training areas.

  16. The ALMA assembly, integration, and verification project: a retrospective analysis

    Science.gov (United States)

    Lopez, B.; Knee, L. B. G.; Jager, H.; Whyborn, N.; McMullin, J.; Murowinski, R.; Peck, A.; Corder, S.

    2014-08-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Assembly, Integration, and Verification (AIV) of the antennas was completed at the end of the year 2013, while the final optimization and complete expansion to validate all planned observing modes will continue. This paper compares the actually obtained results of the period 2008-2013 with the baselines that had been laid out in the early project-planning phase (2005-2007). First plans made for ALMA AIV had already established a two-phased project life-cycle: phase 1 for setting up necessary infrastructure and common facilities, and taking the first three antennas to the start of commissioning; and phase 2 focused on the steady state processing of the remaining units. Throughout the execution of the project this lifecycle was refined and two additional phases were added, namely a transition phase between phases 1 and 2, and a closing phase to address the project ramp-down. A sub-project called Accelerated Commissioning and Science Verification (ACSV) was carried out during the year 2009 in order to provide focus to the whole ALMA organization, and to accomplish the start-of-commissioning milestone. Early phases of CSV focused on validating the basic performance and calibration. Over time additional observing modes have been validated as capabilities expanded both in hardware and software. This retrospective analysis describes the originally presented project staffing plans and schedules, the underlying assumptions, identified risks and operational models, among others. For comparison actual data on staffing levels, the resultant schedule, additional risks identified and those that actually materialized, are presented. The

  17. Integrating gender into natural resources management projects: USAID lessons learned.

    Science.gov (United States)

    1998-01-01

    This article discusses USAID's lessons learned about integrating gender into natural resource management (NRM) projects in Peru, the Philippines, and Kenya. In Peru, USAID integrated women into a solid waste management project by lending money to invest in trash collection supplies. The loans allowed women to collect household waste, transfer it to a landfill, and provide additional sanitary disposal. The women were paid through direct fees from households and through service contracts with municipalities. In Mindanao, the Philippines, women were taught about the health impact of clean water and how to monitor water quality, including the monitoring of E. coli bacteria. Both men and women were taught soil conservation techniques for reducing the amount of silt running into the lake, which interferes with the generation of electricity and affects the health of everyone. The education helped women realize the importance of reducing silt and capitalized on their interest in protecting the health of their families. The women were thus willing to monitor the lake's water quality to determine if the conservation efforts were effective. In Kenya, USAID evaluated its Ecology, Community Organization, and Gender project in the Rift Valley, which helped resettle a landless community and helped with sustainable NRM. The evaluation revealed that women's relative bargaining power was less than men's. Organized capacity building that strengthened women's networks and improved their capacity to push issues onto the community agenda assured women a voice in setting the local NRM agenda. PMID:12321706

  18. Integrated Global Observation Strategy - Ozone and Atmospheric Chemistry Project

    Science.gov (United States)

    Hilsenrath, Ernest; Readings, C. J.; Kaye, J.; Mohnen, V.; Einaudi, Franco (Technical Monitor)

    2000-01-01

    The "Long Term Continuity of Stratospheric Ozone Measurements and Atmospheric Chemistry" project was one of six established by the Committee on Earth Observing Satellites (CEOS) in response to the Integrated Global Observing Strategy (IGOS) initiative. IGOS links satellite and ground based systems for global environmental observations. The strategy of this project is to develop a consensus of user requirements including the scientific (SPARC, IGAC, WCRP) and the applications community (WMO, UNEP) and to develop a long-term international plan for ozone and atmospheric chemistry measurements. The major components of the observing system include operational and research (meeting certain criteria) satellite platforms planned by the space faring nations which are integrated with a well supported and sustained ground, aircraft, and balloon measurements program for directed observations as well satellite validation. Highly integrated and continuous measurements of ozone, validation, and reanalysis efforts are essential to meet the international scientific and applications goals. In order to understand ozone trends, climate change, and air quality, it is essential to conduct long term measurements of certain other atmospheric species. These species include key source, radical, and reservoir constituents.

  19. On coarse projective integration for atomic deposition in amorphous systems

    Energy Technology Data Exchange (ETDEWEB)

    Chuang, Claire Y., E-mail: yungc@seas.upenn.edu, E-mail: meister@unm.edu, E-mail: zepedaruiz1@llnl.gov; Sinno, Talid, E-mail: talid@seas.upenn.edu [Department of Chemical and Biomolecular Engineering, University of Pennsylvania, 220 South 33rd Street, 311A Towne Building, Philadelphia, Pennsylvania 19104 (United States); Han, Sang M., E-mail: yungc@seas.upenn.edu, E-mail: meister@unm.edu, E-mail: zepedaruiz1@llnl.gov [Department of Chemical and Biological Engineering, University of New Mexico, 1 University of New Mexico, MSC01 1120, Albuquerque, New Mexico 87131 (United States); Zepeda-Ruiz, Luis A., E-mail: yungc@seas.upenn.edu, E-mail: meister@unm.edu, E-mail: zepedaruiz1@llnl.gov [Lawrence Livermore National Laboratory, P.O. Box 808, L-367, Livermore, California 94550 (United States)

    2015-10-07

    Direct molecular dynamics simulation of atomic deposition under realistic conditions is notoriously challenging because of the wide range of time scales that must be captured. Numerous simulation approaches have been proposed to address the problem, often requiring a compromise between model fidelity, algorithmic complexity, and computational efficiency. Coarse projective integration, an example application of the “equation-free” framework, offers an attractive balance between these constraints. Here, periodically applied, short atomistic simulations are employed to compute time derivatives of slowly evolving coarse variables that are then used to numerically integrate differential equations over relatively large time intervals. A key obstacle to the application of this technique in realistic settings is the “lifting” operation in which a valid atomistic configuration is recreated from knowledge of the coarse variables. Using Ge deposition on amorphous SiO{sub 2} substrates as an example application, we present a scheme for lifting realistic atomistic configurations comprised of collections of Ge islands on amorphous SiO{sub 2} using only a few measures of the island size distribution. The approach is shown to provide accurate initial configurations to restart molecular dynamics simulations at arbitrary points in time, enabling the application of coarse projective integration for this morphologically complex system.

  20. Conceptual design report, 200 Area sanitary sewer system: Project 96L-EWL-116

    International Nuclear Information System (INIS)

    Project L-116 will install an integrated sanitary sewer system in the 200 Area. This new system will connect existing sewer systems for facilities that have a foreseeable future, provide capacity and routing for future facilities, and install new septic sewer systems for existing facilities that cannot be feasibly connected to the new sewer system and have a mission that will extend beyond the year 2000. Project L-116 will construct a sanitary sewer collection, treatment, and disposal system for facilities in the 200-East and -West Areas and adjacent areas located on the 200 Area plateau. The existing septic systems will be abandoned or decommissioned in accordance with applicable Washington State and local codes and regulations. The conceptual design for the sanitary sewer system is designed around population forecasts of 5,000 people for 200-West Area and 9,000 people for 200-East Area. The definitive design will be based on the latest forecast populations at the time definitive design is initiated

  1. The Albufera Initiative for Biodiversity: a cost effective model for integrating science and volunteer participation in coastal protected area management

    NARCIS (Netherlands)

    Riddiford, N.J.; Veraart, J.A.; Férriz, I.; Owens, N.W.; Royo, L.; Honey, M.R.

    2014-01-01

    This paper puts forward a multi-disciplinary field project, set up in 1989 at the Parc Natural de s’Albufera in Mallorca, Balearic Islands, Spain, as an example of a cost effective model for integrating science and volunteer participation in a coastal protected area. Outcomes include the provision o

  2. Sterile insect technique. Principles and practice in area-wide integrated pest management

    International Nuclear Information System (INIS)

    For several major insect pests, the environment-friendly sterile insect technique (SIT) is being applied as a component of area-wide integrated pest management (AW-IPM) programmes. This technology, using radiation to sterilize insects, was first developed in the USA, and is currently applied on six continents. For four decades it has been a major subject for research and development in the Joint FAO/IAEA Programme on Nuclear Techniques in Food and Agriculture, involving both research and the transfer of this technology to Member States so that they can benefit from improved plant, animal and human health, cleaner environments, increased production of plants and animals in agricultural systems, and accelerated economic development. The socio-economic impacts of AW-IPM programmes that integrate the SIT have confirmed the usefulness of this technology. Numerous publications related to the integration of the SIT in pest management programmes, arising from research, coordinated research projects, field projects, symposia, meetings, and training activities have already provided much information to researchers, pest-control practitioners, programme managers, plant protection and animal health officers, and policy makers. However, by bringing together and presenting in a generic fashion the principles, practice, and global application of the SIT, this book will be a major reference source for all current and future users of the technology. The book will also serve as a textbook for academic courses on integrated pest management. Fifty subject experts from 19 countries contributed to the chapters, which were all peer reviewed before final editing

  3. CALIFA, the Calar alto legacy integral field area survey

    DEFF Research Database (Denmark)

    Husemann, B.; Jahnke, K.; Sánchez, S. F.;

    2013-01-01

    We present the first public data release (DR1) of the Calar Alto Legacy Integral Field Area (CALIFA) survey. It consists of science-grade optical datacubes for the first 100 of eventually 600 nearby (0.005 field spectrograph PMAS/PPak mounted...... on the 3.5 m telescope at the Calar Alto observatory. The galaxies in DR1 already cover a wide range of properties in color-magnitude space, morphological type, stellar mass, and gas ionization conditions. This offers the potential to tackle a variety of open questions in galaxy evolution using spatially...... with a spectral resolution of 2.3 Å (FWHM). We present the characteristics and data structure of the CALIFA datasets that should be taken into account for scientific exploitation of the data, in particular the effects of vignetting, bad pixels and spatially correlated noise. The data quality test for all 100...

  4. Draft Area Recommendation Report for the Crystalline Repository Project: Overview

    International Nuclear Information System (INIS)

    The draft Area Recommendation Report (ARR) for the Crystalline Repository Project identifies portions of crystalline rock bodies as proposed potentially acceptable sites for the Nation's second repository for deep geologic burial of high-level radioactive waste and spent nuclear fuel. This Overview provides a brief summary of that report. The US Department of Energy (DOE) evaluated available geologic and environmental data for 235 crystalline rock bodies in the North Central, Northeastern, and Southeastern Regions to identify preliminary candidate areas. The 12 proposed potentially acceptable sites are located in the States of Georgia (1), Maine (2), Minnesota (3), New Hampshire (1), North Carolina (2), Virginia (2), and Wisconsin (1). The data, analyses and rationale pertaining to the identification of the 12 proposed potentially acceptable sites are presented in the draft ARR. The analyses presented in the draft ARR demonstrate that the evidence available for each proposed potentially acceptable site supports (1) a finding that the site is not disqualified under Appendix III of the DOE Siting Guidelines and (2) a decision to proceed with the continued investigation of the site on the basis of the favorable and potentially adverse conditions identified to date. These potentially acceptable sites will be investigated and evaluated in more detail during the area phase of the siting process and considered along with other candidate sites in a progressive narrowing process to finally choose the site of the second repository in 1998

  5. Advanced Large Area Plastic Scintillator Project (ALPS): Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, David V.; Reeder, Paul L.; Todd, Lindsay C.; Warren, Glen A.; McCormick, Kathleen R.; Stephens, Daniel L.; Geelhood, Bruce D.; Alzheimer, James M.; Crowell, Shannon L.; Sliger, William A.

    2008-02-05

    The advanced Large-Area Plastic Scintillator (ALPS) Project at Pacific Northwest National Laboratory investigated possible technological avenues for substantially advancing the state-of-the-art in gamma-ray detection via large-area plastic scintillators. The three predominant themes of these investigations comprised the following: * Maximizing light collection efficiency from a single large-area sheet of plastic scintillator, and optimizing hardware event trigger definition to retain detection efficiency while exploiting the power of coincidence to suppress single-PMT "dark current" background; * Utilizing anti-Compton vetoing and supplementary spectral information from a co-located secondary, or "Back" detector, to both (1) minimize Compton background in the low-energy portion of the "Front" scintillator's pulse-height spectrum, and (2) sharpen the statistical accuracy of the front detector's low-energy response prediction as impelmented in suitable energy-windowing algorithms; and * Investigating alternative materials to enhance the intrinsic gamma-ray detection efficiency of plastic-based sensors.

  6. Is Europe Evolving Toward an Integrated Research Area?

    CERN Document Server

    Chessa, Alessandro; Pammolli, Fabio; Penner, Orion; Petersen, Alexander M; Riccaboni, Massimo; 10.1126/science.1227970

    2013-01-01

    An integrated European Research Area (ERA) is a critical component for a more competitive and open European R&D system. However, the impact of EU-specific integration policies aimed at overcoming innovation barriers associated with national borders is not well understood. Here we analyze 2.4 x 10^6 patent applications filed with the European Patent Office (EPO) over the 25-year period 1986-2010 along with a sample of 2.6 x 10^5 records from the ISI Web of Science to quantitatively measure the role of borders in international R&D collaboration and mobility. From these data we construct five different networks for each year analyzed: (i) the patent co-inventor network, (ii) the publication co-author network, (iii) the co-applicant patent network, (iv) the patent citation network, and (v) the patent mobility network. We use methods from network science and econometrics to perform a comparative analysis across time and between EU and non-EU countries to determine the "treatment effect" resulting from EU i...

  7. Flexible riser integrity management: areas of concern and applications

    Energy Technology Data Exchange (ETDEWEB)

    Podskarbi, Mateusz [Schlumberger Servicos de Petroleo Ltda., Rio de Janeiro, RJ (Brazil)

    2008-07-01

    Flexible risers are key enables for both deep water and shallow water offshore production developments. Number of flexible risers installed worldwide is into several thousands with two main concentration areas - offshore Brazil and North Sea. Flexible risers are subject to significant loads including environmental impacts, vessel motions, internal temperature and pressure as well as substantial installation loads. Excessive loads of one type or a combination of various types of loads can cause damage to the flexible that can lead to a catastrophic failure. Industry observed number of failures increasing in recent years. Operators and manufacturing companies are taking various steps to address this issue. One of possible approaches is to use monitoring instrumentation to measure riser response and integrity in real time. This paper reviews various types of flexible riser damage mechanisms caused by impact damage, corrosion, excessive pressure, armor wire rupture, compromising flexible riser minimum bend radius, excessive fatigue loading, etc. Failure mechanisms are reviewed with particular focus on the consequences that it causes in terms of risk to the infrastructure and detectable changes. Further part of the paper is focused on monitoring techniques employed and available to detect particular types of failure mechanisms. Systematic review of the monitoring techniques is provided with specific attention given to ability of these techniques to provide early warnings of riser failure. Evaluation of monitoring techniques versus modes of operation and failure mechanism is key to selecting appropriate system that ensures effectiveness of the integrity management program. (author)

  8. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  9. Optimizing integrated reference cases in the OCTAVIUS project

    DEFF Research Database (Denmark)

    Kvamsdal, Hanne M.; Ehlers, Sören; Kather, Alfons;

    2016-01-01

    Adding a carbon capture plant to a power plant reduces the efficiency of said power plant. In order to keep this drop in efficiency as small as possible, several optimisation studies are performed in the OCTAVIUS project. Based on the work of the European Benchmarking Task Force-EBTF within...... the CESAR, CAESAR, and DECARBit projects, two reference power plants are modelled in Ebsilon®Professional. The first is an 800 MWe coal case, the second a 430 MWe natural gas combined cycle (NGCC) case. For each power plant two separate capture plants are considered: one using 30 wt% MEA as solvent system......, the other with CESAR1, a mixture of AMP and PZ as solvent system. This results in four different reference cases which are optimized by varying different process parameters and evaluating process modifications. In a second step, the integration of the capture plant into the power plant is evaluated...

  10. Commercial Structures for Integrated CCS-EOR Projects

    OpenAIRE

    Agarwal, Anna; Parsons, John E

    2011-01-01

    In this paper, we evaluate alternate commercial structures for an integrated CCS-EOR project where the source of CO[subscript 2] is a coal-fired power plant, and the CO[subscript 2] is transported via a dedicated pipeline to an oil field where the CO[subscript 2] is injected for EOR. We evaluate alternative contract types that link the involved entities in light of exogenous market risks, such as the fluctuating price of oil recovered. The choice of the contract type determines who would bear...

  11. DEFINITION OF RATIONAL AMOUNT OF INTEGRATED TRANSPORT COMPANIES IN THE CITY AND AREAS OF THEIR SERVICE

    OpenAIRE

    Ye. Nagornji; Mospan, V.

    2014-01-01

    An approach to the definition of sustainable integrated transport companies in the city and areas of their service is offered. Using this approach, there was determined a rational number of integrated transport companies and areas of their service.

  12. Closure report for CAU No. 416: Project Shoal Area

    International Nuclear Information System (INIS)

    This Closure Report provides the documentation for closure of the US Department of Energy/Nevada Operations Office (DOE/NV) Project Shoal Area (PSA) Surface Corrective Action Unit (CAU) 416. CAU 416 consists of a mud pit, muckpile, and housekeeping site. The PSA is located approximately 48.3 kilometers (30 miles) southeast of Fallon, Nevada. The mud pit was the result of drilling activities at the PSA in 1963. Investigation activities completed in 1996 determined drilling mud in the mud pit was impacted with petroleum hydrocarbons in excess of the State of Nevada 100 milligram per kilogram (mg/kg). The muckpile consists of broken granite from emplacement shaft and drift (tunnel) mining activities at the PSA in 1963. The housekeeping site consisted of approximately 20 used, empty, rusted, steel 0.9 liter (1 quart) oil cans

  13. 76 FR 18780 - Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement Project, Benton...

    Science.gov (United States)

    2011-04-05

    ... Bureau of Reclamation Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement... Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement Project. The Washington State... Integrated Water Resource Management Alternative in June 2009 under SEPA. The......

  14. Integrated Methodology for Estimating Water Use in Mediterranean Agricultural Areas

    Directory of Open Access Journals (Sweden)

    George C. Zalidis

    2009-08-01

    Full Text Available Agricultural use is by far the largest consumer of fresh water worldwide, especially in the Mediterranean, where it has reached unsustainable levels, thus posing a serious threat to water resources. Having a good estimate of the water used in an agricultural area would help water managers create incentives for water savings at the farmer and basin level, and meet the demands of the European Water Framework Directive. This work presents an integrated methodology for estimating water use in Mediterranean agricultural areas. It is based on well established methods of estimating the actual evapotranspiration through surface energy fluxes, customized for better performance under the Mediterranean conditions: small parcel sizes, detailed crop pattern, and lack of necessary data. The methodology has been tested and validated on the agricultural plain of the river Strimonas (Greece using a time series of Terra MODIS and Landsat 5 TM satellite images, and used to produce a seasonal water use map at a high spatial resolution. Finally, a tool has been designed to implement the methodology with a user-friendly interface, in order to facilitate its operational use.

  15. Specifics of projects in the area of Enterprise architecture development

    OpenAIRE

    KOZNOV D.V.; ARZUMANYAN M.YU.; ORLOV YU.V.; DEREVYANKO M.A.; ROMANOVSKY K.YU.; SIDORINA A.A.

    2015-01-01

    Enterprise Architecture (EA) is a discipline for business and IT system management, describing the fundamental artifacts of business and IT. Introducing EA activities in a company is done via special projects (referred to as EAM projects). While much research focuses on EA as is, EAM projects are not yet considered properly. This paper deals with EAM projects as a special kind of IT project. The definition of an EAM project is suggested using the IT solution concept of the Microsoft Solution ...

  16. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  17. The National Map - Lake Tahoe Area Pilot Project

    Science.gov (United States)

    ,

    2001-01-01

    Governments depend on a common set of geographic base information as a tool for economic and community development, land and natural resource management, and health and safety services. Emergency management and defense operations rely on this information. Private industry, nongovernmental organizations, and individual citizens use the same geographic data. Geographic information underpins an increasingly large part of the Nation's economy. Available geographic data often have the following problems: * They do not align with each other because layers are frequently created or revised separately, * They do not match across administrative boundaries because each producing organization uses different methods and standards, and * They are not up to date because of the complexity and cost of revision. The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information to address these issues. The National Map will serve as a foundation for integrating, sharing, and using other data easily and consistently. In collaboration with other government agencies, the private sector, academia, and volunteer groups, the USGS will coordinate, integrate, and, where needed, produce and maintain base geographic data. The National Map will include digital orthorectified imagery; elevation data; vector data for hydrography, transportation, boundary, and structure features; geographic names; and land cover information. The data will be the source of revised paper topographic maps. Many technical and institutional issues must be resolved as The National Map is implemented. To begin the refinement of this new paradigm, pilot projects are being designed to identify and investigate these issues. The pilots are the foundation upon which future partnerships for data sharing and maintenance will be built.

  18. The NASA Energy and Water Cycle Extreme (NEWSE) Integration Project

    Science.gov (United States)

    House, P. R.; Lapenta, W.; Schiffer, R.

    2008-01-01

    Skillful predictions of water and energy cycle extremes (flood and drought) are elusive. To better understand the mechanisms responsible for water and energy extremes, and to make decisive progress in predicting these extremes, the collaborative NASA Energy and Water cycle Extremes (NEWSE) Integration Project, is studying these extremes in the U.S. Southern Great Plains (SGP) during 2006-2007, including their relationships with continental and global scale processes, and assessment of their predictability on multiple space and time scales. It is our hypothesis that an integrative analysis of observed extremes which reflects the current understanding of the role of SST and soil moisture variability influences on atmospheric heating and forcing of planetary waves, incorporating recently available global and regional hydro- meteorological datasets (i.e., precipitation, water vapor, clouds, etc.) in conjunction with advances in data assimilation, can lead to new insights into the factors that lead to persistent drought and flooding. We will show initial results of this project, whose goals are to provide an improved definition, attribution and prediction on sub-seasonal to interannual time scales, improved understanding of the mechanisms of decadal drought and its predictability, including the impacts of SST variability and deep soil moisture variability, and improved monitoring/attributions, with transition to applications; a bridging of the gap between hydrological forecasts and stakeholders (utilization of probabilistic forecasts, education, forecast interpretation for different sectors, assessment of uncertainties for different sectors, etc.).

  19. FixO3 Network Project: Integration, harmonization and innovation

    Science.gov (United States)

    Lampitt, Richard; Cristini, Luisa

    2016-04-01

    The Fixed point Open Ocean Observatory network (FixO3, http://www.fixo3.eu/) seeks to integrate 23 European open ocean fixed point observatories in the Atlantic Ocean and Mediterranean Sea and to improve access to these infrastructures for the broader community. These provide multidisciplinary observations from the air-sea interface to the deep seafloor. Started in September 2013 with a budget of 7 Million Euros over 4 years, the project has 29 partners drawn from academia, research institutions and SME's coordinated by the National Oceanography Centre, UK. The project is structured in 12 Work Packages aimed to: • integrate and harmonise the current infrastructures and processes • offer free access to observatory infrastructures to those who do not have such access, and free and open data services and products • innovate and enhance the current capability for multidisciplinary in situ ocean observation Here we present the programme's key achievements mid-way, the current activities and expected results. Emphasis will be on FixO3-generated tools and products and their applications for the wider oceanographic community for the benefit of science, industry and policy.

  20. Initial comments on the aero geophysical information present at the B and C areas of the Itatira (Brazil) project

    International Nuclear Information System (INIS)

    The aero geophysical project called Itatira,, accomplished by LASA Engenharia e Prospeccoes S.A., Between September and November/1977 through contract with NUCLEBRAS, corresponds to one of the first project of this gender accomplished in national territory. In this project were flight more than 80 000 km of linear lines, which covered approximately 38 000 km2 on the precambrian terrains of the Ceara State, NE Brazil. For several reasons, the total area of the project was subdivided in three sub-areas (A, B and C), each one covered by a different airship (LAS, 1977). This paper presents the geophysical information and preliminary interpretations of the areas B and C that were obtained through the integrated use of the soft wares AUTOCAD r. 14, OASIS MONTAJ r.4.2 and ERMAPPER r.5.5. (author)

  1. Draft environmental assessment -- Test Area North pool stabilization project update

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

  2. Environmental Assessment -- Test Area North pool stabilization project update

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

  3. Earthquake supersite project in the Messina Straits area (EQUAMES)

    Science.gov (United States)

    Mattia, Mario; Chiarabba, Claudio; Dell'Acqua, Fabio; Faccenna, Claudio; Lanari, Riccardo; Matteuzzi, Francesco; Neri, Giancarlo; Patanè, Domenico; Polonia, Alina; Prati, Claudio; Tinti, Stefano; Zerbini, Susanna

    2015-04-01

    A new permanent supersite is going to be proposed to the GEO GSNL (Geohazard Supersites and National Laboratories) for the Messina Straits area (Italy). The justification for this new supersite can be found in its geological and geophysical features and in the exposure to strong earthquakes, also in the recent past (1908). The Messina Supersite infrastructure (EQUAMES: EarthQUAkes in the MEssina Straits) will host, and contribute to the collection of, large amounts of data, basic for the analysis of seismic hazard/risk in this high seismic risk area, including risk from earthquake-related processes such as submarine mass failures and tsunamis. In EQUAMES, data of different types will coexist with models and methods useful for their analysis/interpretation and with first-level products of analysis that can be of interest for different kinds of users. EQUAMES will help all the interested scientific and non-scientific subjects to find and use data and to increase inter-institutional cooperation by addressing the following main topics in the Messina Straits area: • investigation of the geological and physical processes leading to the earthquake preparation and generation; • analysis of seismic shaking at ground (expected and observed); • combination of seismic hazard with vulnerability and exposure data for risk estimates; • analysis of tsunami generation, propagation and coastal inundation deriving from earthquake occurrence also through landslides due to instability conditions of subaerial and submarine slopes; • overall risk associated to earthquake activity in the Supersite area including the different types of cascade effects Many Italian and international Institutions have shown an effective interest in this project where a large variety of geophysical and geological in-situ data will be collected and where the INGV has the leading role with its large infrastructure of seismic, GPS and geochemical permanent stations. The groups supporting EQUAMES

  4. Management of area-wide integrated pest management programmes that integrate the sterile insect technique

    International Nuclear Information System (INIS)

    Effective management of area-wide integrated pest management (AW-IPM) programmes that integrate the sterile insect technique (SIT) is key to success. Programme planning includes collection of baseline data and a feasibility assessment. The optimal management structure is where the programme can be implemented effectively and flexibly, independent of government politics, bureaucracy, and even corruption that impede timely goal achievement. Ideally, programmes include both public and private management, and require strong and steady financial support. Governments and donors are the most common sources of funds, but a mixture of public, community, and private funds is now the trend. Interrupted cash flow severely restrains programme performance. Physical support of programme operations must be reliable, and led by a maintenance professional. It is essential to have full-time, well-paid, and motivated staff led by a programme manger with technical and management experience. Programme failure is usually due to poor management and inadequate public support, and not to poor technology. (author)

  5. Fostering food security in areas of extreme poverty through Integrated Farm Management: the case of Burundi

    Science.gov (United States)

    Kessler, Aad; van Duivenbooden, Niek; van Beek, Christy

    2014-05-01

    Extreme poverty in Burundi's rural area and tensions between families with limited access to arable land hinder development towards a more stable and peaceful society. Due to these tensions and a rapid population growth, agricultural land is currently subject to increased degradation and low agricultural productivity. A whole range of other limiting factors contributes to this, such as: poor seed quality, poor nutrient management combined with low soil fertility, inadequate agronomic practices, pests and crop diseases, poorly developed supply chains, health problems, difficult access to credit, and insecurity. Solving one of these problems will not solve the chain that eventually leads to low food production; it will simply move the emphasis to the next constraining factor. An integrated rural development approach is therefore required to break this vicious circle. The project Fanning the Spark, a Public-Private-Partnership between Achmea Foundation, Alterra of Wageningen University and Research Centre, and HealthNet-TPO in Burundi started in September 2013 with an intervention in several rural villages in Gitega. The project's objective is to increase food production at village level, by means of investments in crop production, a family (income) insurance package that protects rural families against the financial consequences of catastrophic events (natural and health) and making micro-credits available. This will enhance farmers' workability and generate income from agricultural activities in order to break the poverty cycle and enhance food security. The insurance package comprises agricultural and health insurances, and will be jointly implemented with the sustainable agriculture component. The latter component focuses on Integrated Farm Management and the use of innovative soil management practices. Farmer-to-farmer training and scaling-up are crucial components, and in the first phase of the project "innovative farmer groups" have a central role in the

  6. Integration of PV modules in existing Romanian buildings from rural areas

    Energy Technology Data Exchange (ETDEWEB)

    Fara, S.; Finta, D. [IPA SA Research Development, Engineering and Manufacturing for Automation Equipment and Systems, Bucharest (Romania); Fara, L.; Comaneci, D. [Polytechnic Univ. of Bucharest (Romania); Dabija, A.M. [Univ. of Architecture and Urbanism Ion Mincu, Bucharest (Romania); Tulcan-Paulescu, E. [West Univ. of Timisoara, Timisoara (Romania)

    2010-07-01

    Romania has launched a national research project to promote the use of distributed solar architecture and the use of BIPV systems. These systems include solar tunnels and active solar photovoltaic (PV) systems installed on the roofs and facades of buildings in rural areas. In contrast to other EU states, Romania does not have a photovoltaic building construction branch. The number of isolated cases are insufficient to identify a starting point regarding the PV market in the building industry. The main objective of the project is to demonstrate the efficiency of integrating various PV elements in buildings from rural areas, to test them and to make them known so that they can be used on a large scale. This will be accomplished by installing new products on 2 buildings in Bucharest and in 1 building in Timisoara. The PV modules will be integrated with the architecture. One of the buildings will be a historical building while the other 2 will be new buildings with different typologies. The installed power for each building will be of about 1.000 Wp, including some technologies with PV modules.

  7. Mixed waste focus area integrated master schedule (current as of May 6, 1996)

    International Nuclear Information System (INIS)

    The mission of the Mixed Waste Characterization, Treatment, and Disposal Focus Area (MWFA) is to provide acceptable treatment systems, developed in partnership with users and with the participation of stakeholders, tribal governments, and regulators, that are capable of treating the Department of Energy's (DOE's) mixed wastes. In support of this mission, the MWTA produced the Mixed Waste Focus Area Integrated Technical Baseline Report, Phase I Volume 1, January 16, 1996, which identified a prioritized list of 30 national mixed waste technology deficiencies. The MWFA is targeting funding toward technology development projects that address the current list of deficiencies. A clear connection between the technology development projects and the EM-30 and EM-40 treatment systems that they support is essential for optimizing the MWFA efforts. The purpose of the Integrated Master Schedule (IMS) is to establish and document these connections and to ensure that all technology development activities performed by the MWFA are developed for timely use in those treatment systems. The IMS is a list of treatment systems from the Site Treatment Plans (STPs)/Consent Orders that have been assigned technology development needs with associated time-driven schedules, Technology deficiencies and associated technology development (TD) needs have been identified for each treatment system based on the physical, chemical, and radiological characteristics of the waste targeted for the treatment system. The schedule, the technology development activities, and the treatment system have been verified through the operations contact from the EM-30 organization at the site

  8. Spent fuel and radioactive waste: an integrated data base of inventories, projections, and characteristics

    International Nuclear Information System (INIS)

    The Integrated Data Base (IDB) Program provides official US Department of Energy (DOE) data on spent fuel and radioactive waste inventories, projections, and characteristics. This information is provided through the cooperative efforts of the IDB Program and DOE lead offices, lead sites, major programs, and generator sites. The program is entering its fifth year, and major accomplishments are summarized in three broad areas: (1) the annual inventory report, including ORIGEN2 applications and a Quality Assurance (QA) plan; (2) the summary data file and direct user access; and (3) data processing methodology and support to other programs. Plans for future work in these areas are outlined briefly, including increased utilization of personal computers. Some examples of spent fuel data are given in terms of projected quantities for two growth scenarios, burnup and age profile of the existing inventory, and the approximate specific thermal power relative to high-level waste (HLW) from various sources. 4 refs., 2 figs., 3 tabs

  9. Systematic assessment of wellbore integrity for geologic carbon storage projects using regulatory and industry information

    Energy Technology Data Exchange (ETDEWEB)

    Moody, Mark [Battelle Memorial Institute, Columbus, OH (United States); Sminchak, J.R. [Battelle Memorial Institute, Columbus, OH (United States)

    2015-11-01

    Under this three year project, the condition of legacy oil and gas wells in the Midwest United States was evaluated through analysis of well records, well plugging information, CBL evaluation, sustained casing pressure (SCP) field testing, and analysis of hypothetical CO2 test areas to provide a realistic description of wellbore integrity factors. The research included a state-wide review of oil and gas well records for Ohio and Michigan, along with more detailed testing of wells in Ohio. Results concluded that oil and gas wells are clustered along fields in areas. Well records vary in quality, and there may be wells that have not been identified in records, but there are options for surveying unknown wells. Many of the deep saline formations being considered for CO2 storage have few wells that penetrate the storage zone or confining layers. Research suggests that a variety of well construction and plugging approaches have been used over time in the region. The project concluded that wellbore integrity is an important issue for CO2 storage applications in the Midwest United States. Realistic CO2 storage projects may cover an area in the subsurface with several hundred legacy oil and gas wells. However, closer inspection may often establish that most of the wells do not penetrate the confining layers or storage zone. Therefore, addressing well integrity may be manageable. Field monitoring of SCP also indicated that tested wells provided zonal isolation of the reservoirs they were designed to isolate. Most of these wells appeared to exhibit gas pressure originating from intermediate zones. Based on these results, more flexibility in terms of cementing wells to surface, allowing well testing, and monitoring wells may aid operators in completing CO2 storage project. Several useful products were developed under this project for examining wellbore integrity for CO2 storage applications including, a

  10. Integrated development and testing plan for the plutonium immobilization project

    International Nuclear Information System (INIS)

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D and T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D and T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D and T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the

  11. Integrated controlling technique of ecological environment in Shendong Mining Area

    Institute of Scientific and Technical Information of China (English)

    ZHANG Dong-sheng; LIU Yu-de; WANG An; WANG Yi

    2007-01-01

    To enclose the interactive relation between the underground mining with suitable protection for surface ecological environments and surface prevention of ecological environments adapting to mining disturbing was researched and developed core of this technique. There are three aspects of controlling ecological environments, to dispose and renew before exploitation, to protect surface ecological environments in the exploitative process and to repair and build up after exploitation. Based on the moving law of overburden strata in shallow seam, the surface subsidence law and the growth law of vegetation in subsidence mine area, the integrated controlling technique has been developed synthetically by methods of theoretic analysis, laboratory simulation, numerical calculation,commercial test etc.. It includes the key techniques of aquifer-protective mining, filtering and purging of mine water through goaf, preventing and extinguishing fire in shallow seam,no-rock roadway layout and waste disposal in underground, frame-building ecological functional sphere before exploitation, frame-building the ecological cycle using system after mining and so on.

  12. Integrated MSS-SAR-SPOT-geophysical and geochemical data for exploration geology in Yeder area

    Science.gov (United States)

    Huadong, Guo; Pinliang, Dong

    1992-07-01

    The Yeder test area is located in the north Xinjiang Yugur Autonomous Region of China, in an area with an arid continental climate, sparse vegetation cover and extensive rock outcrops. This paper presents a part of the results of our finished project entitled ``Remote Sensing for Geological and Mineral Exploration in Xinjiang Region of China''. The X-band synthetic aperture radar (SAR) imagery with two illuminated directions is acquired and digitally processed, which demonstrates the effectiveness for the study of geological structure. The Landsat MSS and high resolution SPOT images are mainly used for recognition of rock types. The integrated analysis of remotely sensed, aeromagnetic and geochemical data has been made with the support of the geographic information system. In corroboration with intensive field investigation, we have defined the existence of the ``Yeder are structure'', in which three gold anomalies and an alteration zone have been found.

  13. Application of the Sketch Match method in Sulina coastal study area within PEGASO project

    Science.gov (United States)

    Marin, Eugenia; Nichersu, Iuliana; Mierla, Marian; Trifanov, Cristian; Nichersu, Iulian

    2013-04-01

    The Sketch Match approach for Sulina pilot case was carried out in the frame of the project "People for Ecosystem Based Governance in Assessing Sustainable Development of Ocean and Coast" - PEGASO, funded by the Seventh Framework Programme. The PEGASO project has been designed to identify common threats and solutions in relation to the long-term sustainable development and environmental protection of coastal zones bordering the Mediterranean and Black Seas in ways relevant to the implementation of the Integrated Coastal Zone Management Protocol (ICZM) for the Mediterranean. PEGASO will use the model of the existing ICZM Protocol for the Mediterranean and adjust it to the needs of the Black Sea through innovative actions, one of them being Refine and develop efficient and easy to use tools for making sustainability assessments in the coastal zone tested through a number of relevant pilot sites. Thus, for the Romania case study, the Sketch Match approach was selected, being an interactive public participation planning method, developed by the Dutch Government, and applied for Sulina area in order to stimulate support and involvement from stakeholders regarding Integrated Coastal Zone Management Protocol by consulting and involving these people in the planning process and making use of a coherent package of interactive methods. Participants were representatives of a wide range of stakeholders, varying from local fisherman to representatives of the Local and County council and Danube Delta Biosphere Reserve Authority. They participated in a two-day design session, focused on problems and potentials of the area, with the aim to work out possible solutions for an integrated coastal spatial planning, focusing on the parallel enhance of the various local functions in the spatial design (coastal area protection next to industry, tourism, nature, recreation, and other activities).

  14. Projection of Favorable Gas-Producting Areas From Paleoenvironmental Data

    Energy Technology Data Exchange (ETDEWEB)

    Zielinski, R.E.; Dixon, J. A.; McIver, R. D.; Reaugh, A. B.

    1979-12-31

    Paleoenvironmental biofacies analysis of recent wells in dark Devonian shales in the Applachian Basin has shown that these facies can be projected to areas with no control points. In particular, the facies distribution in Perry County, Kentucky, were found to be precisely those that were predicted earlier from biofacies and organic geochemical data from the VA-1 well in Wise County, Virginia, and the KY-2 well in Martin County, Kentucky. This demonstrates the importance of these data in assessing the volume of gas in the shale throughout the basin as well as in selecting future test sites. The recent biofacies and geochemical work together with a review of the tectonics of the basin have contributed to an evolving interpretation of the geologic control of the biofacies. While a marine environment persisted throughout the Upper Devonian over the Applachian and Illinois Basin (and probably the Michigan Basin), dynamic emergent areas controlled an intermittent introduction of large amounts of organic matter. Large amounts of non-marine organic matter were periodically transported in the basin from a dynamic source province to the Southeast; massive "blooms" of Tasmanites intermittently spread both east and west from the edges of the emerging Cincinnati Arch. At times one or the other of these organic types swept entirely across the basins; at other times a more normal open marine biota flourished and was deposited, probably under the influence of connections to the open seas to the south and northwest, the north being closed by the collision and suturing of continental plates and the east by the growing Applachian Mountains.

  15. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-02-20

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  16. Project Integration Architecture: A Practical Demonstration of Information Propagation

    Science.gov (United States)

    Jones, William Henry

    2005-01-01

    One of the goals of the Project Integration Architecture (PIA) effort is to provide the ability to propagate information between disparate applications. With this ability, applications may then be formed into an application graph constituting a super-application. Such a super-application would then provide all of the analysis appropriate to a given technical system. This paper reports on a small demonstration of this concept in which a Computer Aided Design (CAD) application was connected to an inlet analysis code and geometry information automatically propagated from one to the other. The majority of the work reported involved not the technology of information propagation, but rather the conversion of propagated information into a form usable by the receiving application.

  17. Uranium soils integrated demonstration: Soil characterization project report

    International Nuclear Information System (INIS)

    An Integrated Demonstration Program, hosted by the Fernald Environmental Management Project (FEMP), has been established for investigating technologies applicable to the characterization and remediation of soils contaminated with uranium. Critical to the design of relevant treatment technologies is detailed information on the chemical and physical characteristics of the uranium waste-form. To address this need a soil sampling and characterization program was initiated which makes use of a variety of standard analytical techniques coupled with state-of-the-art microscopy and spectroscopy techniques. Sample representativeness is evaluated through the development of conceptual models in an effort to identify and understand those geochemical processes governing the behavior of uranium in FEMP soils. Many of the initial results have significant implications for the design of soil treatment technologies for application at the FEMP

  18. The Integrated Cluster Finder for the ARCHES project

    CERN Document Server

    Mints, Alexey; Rosen, Simon; Pineau, François-Xavier; Carrera, Francisco

    2016-01-01

    Context. Clusters of galaxies are important for cosmology and astrophysics. They may be discovered through either the summed optical/IR radiation originating from their member galaxies or via X-ray emission originating from the hot intracluster medium. X- ray samples are not affected by projection effects but a redshift determination typically needs optical and infrared follow-up to then infer X-ray temperatures and luminosities. Aims. We want to confirm serendipitously discovered X-ray emitting cluster candidates and measure their cosmological redshift through the analysis and exploration of multi-wavelength photometric catalogues. Methods. We developed a tool, the Integrated Cluster Finder (ICF), to search for clusters by determining overdensities of potential member galaxies in optical and infrared catalogues. Based on a spectroscopic meta-catalogue we calibrated colour-redshift relations that combine optical (SDSS) and IR data (UKIDSS, WISE). The tool is used to quantify the overdensity of galaxies agains...

  19. Uranium soils integrated demonstration: Soil characterization project report

    Energy Technology Data Exchange (ETDEWEB)

    Cunnane, J.C. [Argonne National Lab., IL (United States); Gill, V.R. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States); Lee, S.Y. [Oak Ridge National Lab., TN (United States); Morris, D.E. [Los Alamos National Lab., NM (United States); Nickelson, M.D. [HAZWRAP, Oak Ridge, TN (United States); Perry, D.L. [Lawrence Berkeley Lab., CA (United States); Tidwell, V.C. [Sandia National Labs., Albuquerque, NM (United States)

    1993-08-01

    An Integrated Demonstration Program, hosted by the Fernald Environmental Management Project (FEMP), has been established for investigating technologies applicable to the characterization and remediation of soils contaminated with uranium. Critical to the design of relevant treatment technologies is detailed information on the chemical and physical characteristics of the uranium waste-form. To address this need a soil sampling and characterization program was initiated which makes use of a variety of standard analytical techniques coupled with state-of-the-art microscopy and spectroscopy techniques. Sample representativeness is evaluated through the development of conceptual models in an effort to identify and understand those geochemical processes governing the behavior of uranium in FEMP soils. Many of the initial results have significant implications for the design of soil treatment technologies for application at the FEMP.

  20. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  1. Evaluation of functioning of ICDS project areas under Indore and Ujjain divisions of the state of Madhya Pradesh

    Directory of Open Access Journals (Sweden)

    Sanjay Dixit

    2010-07-01

    Full Text Available Background: Integrated Child Development Services (ICDS is recognized worldwide as one of the most efficient community based programmes promoting early childhood care. Regular evaluations of the programme have been conducted to make it more effective and adequate for the beneficiaries. Objectives: To evaluate the functioning of the Anganwadi Centers under different project areas of Indore and Ujjain Divisions. Methods: Under the present evaluation system one ICDS project and five Anganwadi Centers under the project area (AWCs were visited on a monthly basis and services provided reviewed. Findings reported are from nine project areas under Indore and Ujjain Divisions in the state of Madhya Pradesh from October 2008 – June 2009. Results: A total of 45 centers were evaluated. 29 centers were operating from rented buildings and storage facilities were lacking at 19 of the centers. Though the quality of food was acceptable to the beneficiaries shortage of food was a problem at the centers. Absence of Pre-School Education (PSE and Nutrition and Health Education (NHED Kits compromised PSE and NHED activities at the centers. Unavailability of medicine kits, lack of regular visits by the ANMs to the centers and absence of routine health check up of beneficiaries were other problems encountered under the project areas surveyed. Availability of a doctor under each project area was stated as a major need by the workers. Conclusion: Coordinated steps catering to different services provided at the centers are needed to optimize the functioning of the ICDS scheme.

  2. The Greenland analogue project. Geomodel version 1 of the Kangerlussuaq area on Western Greenland

    Energy Technology Data Exchange (ETDEWEB)

    Engstroem, J.; Paananen, M. [GTK Geological Survey of Finland, Espoo (Finland); Klint, K.E. [GEUS Geological Survey of Denmark and Greenland, Copenhagen (Denmark)

    2012-02-15

    During the 2nd annual Greenland Analogue Project modelling workshop in Toronto, November 2010, the hydrological modellers requested an updated geological map and structural model of the field area around Kangerlussuaq, Western Greenland. This report presents an updated GAP Geomodel which utilizes all available information in order to improve the accuracy of the model, especially beneath the ice-sheet. The modelling area was divided into two scales: The regional scale area and the site scale area. The site scale refers to the area were surface mapping has been performed, and where two drillholes (DH-GAP01 and DH-GAP03) were drilled during 2009. Geological and topographical maps from GEUS (sub-model 1) and data extracted from the Geophysical map, GEUS, (sub-model 2) were used in the process to develop GAP Geomodel version 1. These two interpretations were independent from each other and in the final stage these sub-models were integrated and developed into GAP Geological model version 1. The integration resulted in a total of 158 lineaments. These lineaments are referred in the final model as deformation zones and faults, where deformation zones are larger features and faults are single fractures indicating some sense of movement. Four different sets of deformation zones and faults were identified in the regional area. The most prominent feature is the ductile/brittle roughly ENE-WSW trending zones crosscutting the whole area; referred as Type 1. Type 2 and Type 3 zones are in general smaller scale than Type 1 and mostly dominated by brittle deformation. The Type 2 system generally trends NW-SE, while the Type 3 system generally trends NE-SW. The Type 4 features are a brittle and roughly N-S orientated younger system, thus crosscutting all other types. Confirmation and validation of the regional model is based on detailed surface-based examination of fractures within the site area, although the scale is different the same orientations were also identified in the

  3. The Greenland Analogue Project. Geomodel version 1 of the Kangerlussuaq area on Western Greenland

    Energy Technology Data Exchange (ETDEWEB)

    Engstroem, Jon; Paananen, Markku (Geological Survey of Finland (Finland)); Klint, Knud Erik (The National Geological Survey of Denmark and Greenland (Denmark))

    2012-02-15

    During the 2nd annual Greenland Analogue Project modelling workshop in Toronto, November 2010, the hydrological modellers requested an updated geological map and structural model of the field area around Kangerlussuaq, Western Greenland. This report presents an updated GAP geomodel which utilizes all available information in order to improve the accuracy of the model, especially beneath the ice sheet. The modelling area was divided into two scales: The regional scale area and the site scale area. The site scale refers to the area were surface mapping has been performed, and where two boreholes (DH-GAP01 and DH-GAP03) were drilled during 2009. Geological and topographical maps from GEUS (sub-model 1) and data extracted from the geophysical map, GEUS, (sub-model 2) were used in the process to develop GAP geomodel version 1. These two interpretations were independent from each other and in the final stage these sub-models were integrated and developed into GAP geological model version 1. The integration resulted in a total of 158 lineaments. These lineaments are referred in the final model as deformation zones and faults, where deformation zones are larger features and faults are single fractures indicating some sense of movement. Four different sets of deformation zones and faults were identified in the regional area. The most prominent feature is the ductile/brittle roughly ENE-WSW trending zones crosscutting the whole area, referred as Type 1. Type 2 and Type 3 zones are in general smaller scale than Type 1 and mostly dominated by brittle deformation. The Type 2 system generally trends NW-SE, while the Type 3 system generally trends NE-SW. The Type 4 features are a brittle and roughly N-S orientated younger system, thus crosscutting all other types. Confirmation and validation of the regional model is based on detailed surface-based examination of fractures within the site area, although the scale is different the same orientations were also identified in the

  4. Inspire: The Quest for a Coherent Curriculum through a Performing Arts-Focused Curriculum Integration Project

    Science.gov (United States)

    Carlisle, Katie

    2011-01-01

    The author reports on the formation of a performing arts-focused curriculum integration project, in which key components of curriculum integration were employed within a project-focus involving the performing arts of music, theater, and dance. The project occurred within a curricular community partnership between a public school and nearby…

  5. Small Project Rapid Integration and Test Environment (SPRITE) An Innovation Space for Small Projects Design, Development, Integration, and Test

    Science.gov (United States)

    Lee, Ashley; Rackoczy, John; Heater, Daniel; Sanders, Devon; Tashakkor, Scott

    2013-01-01

    Over the past few years interest in the development and use of small satellites has rapidly gained momentum with universities, commercial, and government organizations. In a few years we may see networked clusters of dozens or even hundreds of small, cheap, easily replaceable satellites working together in place of the large, expensive and difficult-to-replace satellites now in orbit. Standards based satellite buses and deployment mechanisms, such as the CubeSat and Poly Pico-satellite Orbital Deployer (P-POD), have stimulated growth in this area. The use of small satellites is also proving to be a cost effective capability in many areas traditionally dominated by large satellites, though many challenges remain. Currently many of these small satellites undergo very little testing prior to flight. As these small satellites move from technology demonstration and student projects toward more complex operational assets, it is expected that the standards for verification and validation will increase.

  6. Duke Energy Photovoltaic Integration Study: Carolinas Service Areas

    Energy Technology Data Exchange (ETDEWEB)

    Lu, Shuai; Samaan, Nader A.; Meng, Da; Chassin, Forrest S.; Zhang, Yu; Vyakaranam, Bharat; Warwick, William M.; Fuller, Jason C.; Diao, Ruisheng; Nguyen, Tony B.; Jin, Chunlian

    2014-03-01

    Solar energy collected using photovoltaic (PV) technology is a clean and renewable energy source that offers multiple benefits to the electric utility industry and its customers, such as cost predictability, reduced emissions, and loss reduction by distributed installations. Renewable energy goals established in North Carolina Senate Bill 3 (SB3), in combination with the state tax credit and decreases in the cost of energy from PV panels, have resulted in rapid solar power penetration within the Carolinas services areas of Duke Energy. Continued decreases in PV prices are expected to lead to greater PV penetration rates than currently required in SB3. Despite the potential benefits, significant penetration of PV energy is of concern to the utility industry because of its impact on operating reliability and integration cost to customers, and equally important, how any additional costs may be allocated to different customer groups. Some of these impacts might become limiting factors for PV energy, especially growing distributed generation installed at customer sites. Recognizing the importance of renewable energy developments for a sustainable energy future and economic growth, Duke Energy has commissioned this study to simulate the effects of high-PV penetration rates and to initiate the process of quantifying the impacts. The objective of the study is to inform resource plans, guide operation improvements, and drive infrastructure investments for a steady and smooth transition to a new energy mix that provides optimal values to customers. The study team consists of experts from Pacific Northwest National Laboratory (PNNL), Power Costs, Inc. (PCI), Clean Power Research (CPR), Alstom Grid, and Duke Energy. PNNL, PCI, and CPR performed the study on generation impacts; Duke Energy modeled the transmission cases; and distribution simulations were conducted by Alstom Grid. PNNL analyzed the results from each work stream and produced the report.

  7. Integrative neural networks models for stream assessment in restoration projects

    Science.gov (United States)

    Gazendam, Ed; Gharabaghi, Bahram; Ackerman, Josef D.; Whiteley, Hugh

    2016-05-01

    Stream-habitat assessment for evaluation of restoration projects requires the examination of many parameters, both watershed-scale and reach-scale, to incorporate the complex non-linear effects of geomorphic, riparian, watershed and hydrologic factors on aquatic ecosystems. Rapid geomorphic assessment tools used by many jurisdictions to assess natural channel design projects seldom include watershed-level parameters, which have been shown to have a significant effect on benthic habitat in stream systems. In this study, Artificial Neural Network (ANN) models were developed to integrate complex non-linear relationships between the aquatic ecosystem health indices and key watershed-scale and reach-scale parameters. Physical stream parameters, based on QHEI parameters, and watershed characteristics data were collected at 112 sites on 62 stream systems located in Southern Ontario. Benthic data were collected separately and benthic invertebrate summary indices, specifically Hilsenhoff's Biotic Index (HBI) and Richness, were determined. The ANN models were trained on the randomly selected 3/4 of the dataset of 112 streams in Ontario, Canada and validated on the remaining 1/4. The R2 values for the developed ANN model predictions were 0.86 for HBI and 0.92 for Richness. Sensitivity analysis of the trained ANN models revealed that Richness was directly proportional to Erosion and Riparian Width and inversely proportional to Floodplain Quality and Substrate parameters. HBI was directly proportional to Velocity Types and Erosion and inversely proportional to Substrate, % Treed and 1:2 Year Flood Flow parameters. The ANN models can be useful tools for watershed managers in stream assessment and restoration projects by allowing consideration of watershed properties in the stream assessment.

  8. OVERVIEW OF ENHANCED HANFORD SINGLE-SHELL TANK (SST) INTEGRITY PROJECT - 12128

    Energy Technology Data Exchange (ETDEWEB)

    VENETZ TJ; BOOMER KD; WASHENFELDER DJ; JOHNSON JB

    2012-01-25

    To improve the understanding of the single-shell tanks integrity, Washington River Protection Solutions, LLC, the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank (SST) Integrity Project in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration, Seventeen of these recommendations were used to develop the basis for the M-45-10-1 Change Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement. The change package identified two phases of work for SST integrity. The initial phase has been focused on efforts to envelope the integrity of the tanks. The initial phase was divided into two primary areas of investigation: structural integrity and leak integrity. If necessary based on the outcome from the initial work, a second phase would be focused on further definition of the integrity of the concrete and liners. Combined these two phases are designed to support the formal integrity assessment of the Hanford SSTs in 2018 by Independent Qualified Registered Engineer. The work to further define the DOE's understanding of the structural integrity SSTs involves preparing a modern Analysis of Record using a finite element analysis program. Structural analyses of the SSTs have been conducted since 1957, but these analyses used analog calculation, less rigorous models, or focused on individual structures. As such, an integrated understanding of all of the SSTs has not been developed to modern expectations. In support of this effort, other milestones will address the visual inspection of the tank concrete and the collection of concrete core samples from the tanks for analysis

  9. Measurements and modelling of atmospheric pollution over the Paris area: an overview of the ESQUIF project

    Energy Technology Data Exchange (ETDEWEB)

    Menut, L.; Vautard, R.; Flamant, P.H. [Centre National de Recherche Scientifique (CNRS), 75 - Paris (France). Lab. de Meteorologie Dynamique; Flamant, C.; Beekmann, M.; Megie, G.; Sicard, M. [Centre National de la Recherche Scientifique (CNRS), 91 - Verrieres-le-Buisson (France). Service d' Aeronomie; Abonnel, C.; Lefebvre, M.P.; Lossec, B. [Meteo-France, 75 - Paris (France); Chazette, P.; Martin, D. [CNRS (France). Lab. des Sciences du Climat et de l' Environnement; Gombert, D. [AIRPARIF, Paris (France); Guedalia, D. [CNRS-Universite Paul Sabatier (France). Lab. d' Aerologie; Kley, D. [Forschungszentrum Juelich GmbH (Germany); Perros, P.; Toupance, G. [CNRS (France). Lab. Interuniversitaire des Systemes Atmospheriques

    2000-11-01

    The ''etude et simulation de la qualite de l'air en ile de France'' (ESQUIF) project is the first integrated project dedicated to the study of the processes leading to air pollution events over the Paris area. The project was carried out over two years (summer 1998 to winter 2000) to document all types of meteorological conditions favourable to air quality degradation, and in particular to photo oxydant formation. The goals of ESQUIF are (1) to improve our understanding of the relevant chemical and dynamical processes and, in turn, improve their parametrizations in numerical models, and (2) to improve and validate existing models dedicated to pollution analysis, scenarios and/or forecasting, by establishing a comprehensive and thorough database. We present the rationale of the ESQUIF project and we describe the experimental set-up. We also report on the first experiments which took place during the summer of 1998 involving surface networks, and remote sensing instruments as well as several aircraft. Focusing on three days of August 1998, the relative contributions of long-range transported and locally-produced ozone to the elevated ozone concentrations observed during this period are discussed and chemistry-transport model preliminary results on this period are compared to measurements. (orig.)

  10. Conference on authorisation procedures and territorial integration of methanation projects

    International Nuclear Information System (INIS)

    The French-German office for Renewable energies (OFAEnR) organised a conference on the authorisation procedures and the territorial integration of methanation projects. In the framework of this French-German exchange of experience, participants exchanged views on the situation of methanation industry in both countries, on the legal framework of authorization procedures, and on the different local strategies for the integration of methanation facilities. A series of presentations deal with the use of digestates and put forward the differences between France and Germany in the use and valorization of methanation digestates. This document brings together the available presentations (slides) made during this event: 1 - Bioenergy in the energy system of the future - Policy framework, new biogas regulations in the EEG 2014 German law (Katharina Boettcher); 2 - The energy Transition for Green Growth law and its role for the French biogas (Timothee Furois); 3 - The 'EMAA' (Energy Methanation Autonomy Nitrogen) plan - Progress status (Lea Molinie); 4 - Biogas in France: current status and outlooks, structuration of a developing industry and its role in the energy transition (Sabrina Fuseliez); 5 - Biogas market in Germany and potentials for development (Sebastian Stolpp); 6 - Authorization procedures in France, and the new unique authorization (Fannie Lavoue); 7 - Approval procedures for biogas plants and the protection of neighbours' rights in Germany (Andreas Grosse); 8 - Regional strategy of methanation development in Ile-de-France (Veronique Charbeaux) 9 - Renewable region and biogas integration: the Brittany biogas plan (Nicolas Chapelat); 10 - Bioenergy regions and the role of biogas - Good examples for sustainable bio-energy use (Birger Kerckow); 11 - Evaluation for registration in france of digestates produced by anaerobic digestion (Patricia Merigout); 12 - Treatment and Conditioning of Fermentation Residues from Biogas Plants (Marcus Trommler); 13

  11. An integrated development workflow for community-driven FOSS-projects using continuous integration tools

    Science.gov (United States)

    Bilke, Lars; Watanabe, Norihiro; Naumov, Dmitri; Kolditz, Olaf

    2016-04-01

    A complex software project in general with high standards regarding code quality requires automated tools to help developers in doing repetitive and tedious tasks such as compilation on different platforms and configurations, doing unit testing as well as end-to-end tests and generating distributable binaries and documentation. This is known as continuous integration (CI). A community-driven FOSS-project within the Earth Sciences benefits even more from CI as time and resources regarding software development are often limited. Therefore testing developed code on more than the developers PC is a task which is often neglected and where CI can be the solution. We developed an integrated workflow based on GitHub, Travis and Jenkins for the community project OpenGeoSys - a coupled multiphysics modeling and simulation package - allowing developers to concentrate on implementing new features in a tight feedback loop. Every interested developer/user can create a pull request containing source code modifications on the online collaboration platform GitHub. The modifications are checked (compilation, compiler warnings, memory leaks, undefined behaviors, unit tests, end-to-end tests, analyzing differences in simulation run results between changes etc.) from the CI system which automatically responds to the pull request or by email on success or failure with detailed reports eventually requesting to improve the modifications. Core team developers review the modifications and merge them into the main development line once they satisfy agreed standards. We aim for efficient data structures and algorithms, self-explaining code, comprehensive documentation and high test code coverage. This workflow keeps entry barriers to get involved into the project low and permits an agile development process concentrating on feature additions rather than software maintenance procedures.

  12. Facilitating telemedicine project sustainability in medically underserved areas: a healthcare provider participant perspective

    OpenAIRE

    Paul, David L.; McDaniel, Reuben R.

    2016-01-01

    Background Very few telemedicine projects in medically underserved areas have been sustained over time. This research furthers understanding of telemedicine service sustainability by examining teleconsultation projects from the perspective of healthcare providers. Drivers influencing healthcare providers’ continued participation in teleconsultation projects and how projects can be designed to effectively and efficiently address these drivers is examined. Methods Case studies of fourteen telec...

  13. Understanding earthquake hazards in urban areas - Evansville Area Earthquake Hazards Mapping Project

    Science.gov (United States)

    Boyd, Oliver S.

    2012-01-01

    The region surrounding Evansville, Indiana, has experienced minor damage from earthquakes several times in the past 200 years. Because of this history and the proximity of Evansville to the Wabash Valley and New Madrid seismic zones, there is concern among nearby communities about hazards from earthquakes. Earthquakes currently cannot be predicted, but scientists can estimate how strongly the ground is likely to shake as a result of an earthquake and are able to design structures to withstand this estimated ground shaking. Earthquake-hazard maps provide one way of conveying such information and can help the region of Evansville prepare for future earthquakes and reduce earthquake-caused loss of life and financial and structural loss. The Evansville Area Earthquake Hazards Mapping Project (EAEHMP) has produced three types of hazard maps for the Evansville area: (1) probabilistic seismic-hazard maps show the ground motion that is expected to be exceeded with a given probability within a given period of time; (2) scenario ground-shaking maps show the expected shaking from two specific scenario earthquakes; (3) liquefaction-potential maps show how likely the strong ground shaking from the scenario earthquakes is to produce liquefaction. These maps complement the U.S. Geological Survey's National Seismic Hazard Maps but are more detailed regionally and take into account surficial geology, soil thickness, and soil stiffness; these elements greatly affect ground shaking.

  14. Integrated Diseases Surveillance Project (IDSP) through a consultant's lens.

    Science.gov (United States)

    Suresh, K

    2008-01-01

    India has long experienced one of the highest burdens of infectious diseases in the world, fueled by factors including a large population, high poverty levels, poor sanitation, and problems with access to health care and preventive services. It has traditionally been difficult to monitor disease burden and trends in India, even more difficult to detect, diagnose, and control outbreaks until they had become quite large. In an effort to improve the surveillance and response infrastructure in the country, in November 2004 the Integrated Disease Surveillance Project (IDSP) was initiated with funding from the World Bank. Given the surveillance challenges in India, the project seeks to accomplish its goals through, having a small list of priority conditions, many of which are syndrome-based at community and sub center level and easily recognizable at the out patients and inpatients care of facilities at lowest levels of the health care system, a simplified battery of laboratory tests and rapid test kits, and reporting of largely aggregate data rather than individual case reporting. The project also includes activities that are relatively high technology, such as computerization, electronic data transmission, and video conferencing links for communication and training. The project is planned to be implemented all over the country in a phased manner with a stress on 14 focus states for intensive follow-up to demonstrate successful implementation of IDSP. The National Institute of Communicable Diseases chosen to provide national leadership may have to immediately address five issues. First, promote surveillance through major hospitals (both in public and private sector) and active surveillance through health system staff and community, second, build capacity for data collation, analysis, interpretation to recognize warning signal of outbreak, and institute public health action, third, develop a system which allows availability of quality test kits at district and state

  15. Integrated development and testing plan for the plutonium immobilization project

    Energy Technology Data Exchange (ETDEWEB)

    Kan, T.

    1998-07-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D&T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D&T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D&T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology

  16. The Empirical Study on the Relationship between Knowledge Integration and IT Project Performance

    Directory of Open Access Journals (Sweden)

    Ying Cui

    2011-08-01

    Full Text Available This article examines the relationship between timely project completion and the management’s integrative capability. Measures of the integrative capability are used to predict on-time project completion, where completion is a function of the duration of IT-related project delays. In a longitudinal study of 74 enterprise application integration projects in the medical sector, integrative capability was measured from the point of view of the CIO and a facility IT manager. Accounting for several project controls, our Cox regression results indicate both integrative dimensions significantly mitigate the duration of IT-related project delays, thus promoting timely project completion. The analysis also reveals the importance of taking management structure into consideration when studying IT phenomena in networked organizations.

  17. Local Area Networks--The ENFI Project (Writing on the College Campus).

    Science.gov (United States)

    Stine, Linda

    1989-01-01

    Describes Electronic Networks for Interaction (ENFI), a local area network project developed at Gallaudet University to empower students with hearing impairments. Notes that this project can be adapted easily for use with traditional students. (MM)

  18. Enabling Technologies for Fabrication of Large Area Flexible Antennas Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Flexible, foldable, and/or inflatable antenna systems open up a wealth of opportunities. Integrating antenna elements and related electronics onto flexible...

  19. MUSE: Challenges to integrate the Multi-Disciplinary field of BB access in one project

    NARCIS (Netherlands)

    Fatome, J.; Pitois, S.; Kamagate, A.; Maillotte, H.; Massoubre., D.; González-Herráez, G.-H.; Smedt, A. de; Brink, R. van den

    2006-01-01

    The present paper discusses the managerial challenges of the MUSE integrated project on multi service broadband access. It addresses different aspects such as matrix organisation, project office, consensus process, standardisation, dissemination, and quality control.

  20. 2007 Florida Division of Emergency Management (FDEM) Lidar: Herbert Hoover Dike Project Area (Southeastern Florida, Lake Okeechobee Surrounding Area)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — LiDAR data was collected by Merrick & Company from September through December of 2007 for the Florida Division of Emergency Management (FDEM). The project area...

  1. Towards sustainable infrastructure development through integrated contracts : Experiences with inclusiveness in Dutch infrastructure projects

    NARCIS (Netherlands)

    Lenferink, Sander; Tillema, Taede; Arts, Jos

    2013-01-01

    Current complex society necessitates finding inclusive arrangements for delivering sustainable road infrastructure integrating design, construction and maintenance stages of the project lifecycle. In this article we investigate whether linking stages by integrated contracts can lead to more sustaina

  2. A demographic model for small area population projections: an application to the Census Metropolitan Area of Hamilton in Ontario, Canada

    OpenAIRE

    Pavlos S. Kanaroglou; Hanna F Maoh; Bruce Newbold; Scott, Darren M; Antonio Paez

    2009-01-01

    This paper reports on the development of a demographic model capable of projecting the spatial distribution of population by age and sex for small areas such as census tracts. The proposed modeling framework makes use of two components: the Rogers multiregional population projection model and the aggregate spatial multinomial logit (ASMNL) model. The Rogers model utilizes cohort vital statistics on fertility, mortality, and migration to project the progression of population by age and sex at ...

  3. Case Study on the Deficiencies and Difficulties of Project Management since the Promotion Stage of Integrated Waste Systems

    Directory of Open Access Journals (Sweden)

    Raluca CUCINSCHI

    2011-06-01

    Full Text Available The present case study focuses on the shortcomings and difficulties encountered in the management of projects in the environment protection area, respectively of integrated waste management systems, observed in similar projects, promoted simultaneously in five counties in Romania, counties located in different development regions. Thus, following a European funding, five counties were selected to receive free consultancy services for the elaboration of the county master in the field of environment protection, respectively waste management. One of the requirements that the counties had to fulfil was the expressed unequivocal willingness to implement the project at county level. A Project Implementation Unit (PIU was set up at county council level with the precise purpose of managing and implementing the project. Even though the counties benefited from free technical assistance, major delays in finalizing and approving the application were encountered in all the cases studied, due to reasons that depended mostly on the manner the project management was conducted.

  4. The NASA Energy and Water cycle Extreme (NEWSE) Integration Project

    Science.gov (United States)

    Houser, P. R.; Lapenta, W.; Schiffer, R.

    2008-05-01

    Skillful predictions of water and energy cycle extremes (flood and drought) are elusive. To better understand the mechanisms responsible for water and energy extremes, and to make decisive progress in predicting these extremes, the collaborative NASA Energy and Water cycle Extremes (NEWSE) Integration Project, is studying these extremes in the U.S. Southern Great Plains (SGP) during 2006-2007, including their relationships with continental and global scale processes, and assessment of their predictability on multiple space and time scales. It is our hypothesis that an integrative analysis of observed extremes which reflects the current understanding of the role of SST and soil moisture variability influences on atmospheric heating and forcing of planetary waves, incorporating recently available global and regional hydro- meteorological datasets (i.e., precipitation, water vapor, clouds, etc.) in conjunction with advances in data assimilation, can lead to new insights into the factors that lead to persistent drought and flooding. We will show initial results of this project, whose goals are toprovide an improved definition, attribution and prediction on sub-seasonal to interannual time scales, improved understanding of the mechanisms of decadal drought and its predictability, including the impacts of SST variability and deep soil moisture variability, and improved monitoring/attributions, with transition to applications; a bridging of the gap between hydrological forecasts and stakeholders (utilization of probabilistic forecasts, education, forecast interpretation for different sectors, assessment of uncertainties for different sectors, etc.). *The NEWSE Team is: Romanou, Anastasiam, Columbia U.; Brian Soden, U. Miami; William Lapenta, NASA- MSFC; Megan Larko, CREW; Bing Lin, NASA-LaRC; Christa Peters-Lidard, NASA-GSFC; Xiquan Dong, U. North Dakota; Debbie Belvedere, CREW; Mathew Sapiano, U. Maryland; Duane Waliser, NASA-JPL; Eni Njoku, NASA/JPL; Eric Fetzer, NASA

  5. Integrated Adaptive Analysis and Visualization of Satellite Network Data Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to develop a system that enables integrated and adaptive analysis and visualization of satellite network management data. Integrated analysis and...

  6. Airborne Wide Area Imager for Wildfire Mapping and Detection Project

    Data.gov (United States)

    National Aeronautics and Space Administration — An advanced airborne imaging system for fire detection/mapping is proposed. The goal of the project is to improve control and management of wildfires in order to...

  7. Project INTEGRATE - a common methodological approach to understand integrated health care in Europe

    Directory of Open Access Journals (Sweden)

    Lucinda Cash-Gibson

    2014-12-01

    Full Text Available Background: The use of case studies in health services research has proven to be an excellent methodology for gaining in-depth understanding of the organisation and delivery of health care. This is particularly relevant when looking at the complexity of integrated healthcare programmes, where multifaceted interactions occur at the different levels of care and often without a clear link between the interventions (new and/or existing and their impact on outcomes (in terms of patients health, both patient and professional satisfaction and cost-effectiveness. Still, integrated care is seen as a core strategy in the sustainability of health and care provision in most societies in Europe and beyond. More specifically, at present, there is neither clear evidence on transferable factors of integrated care success nor a method for determining how to establish these specific success factors. The drawback of case methodology in this case, however, is that the in-depth results or lessons generated are usually highly context-specific and thus brings the challenge of transferability of findings to other settings, as different health care systems and different indications are often not comparable. Project INTEGRATE, a European Commission-funded project, has been designed to overcome these problems; it looks into four chronic conditions in different European settings, under a common methodology framework (taking a mixed-methods approach to try to overcome the issue of context specificity and limited transferability. The common methodological framework described in this paper seeks to bring together the different case study findings in a way that key lessons may be derived and transferred between countries, contexts and patient-groups, where integrated care is delivered in order to provide insight into generalisability and build on existing evidence in this field. Methodology: To compare the different integrated care experiences, a mixed-methods approach has

  8. Project INTEGRATE - a common methodological approach to understand integrated health care in Europe

    Directory of Open Access Journals (Sweden)

    Lucinda Cash-Gibson

    2014-12-01

    Full Text Available Background: The use of case studies in health services research has proven to be an excellent methodology for gaining in-depth understanding of the organisation and delivery of health care. This is particularly relevant when looking at the complexity of integrated healthcare programmes, where multifaceted interactions occur at the different levels of care and often without a clear link between the interventions (new and/or existing and their impact on outcomes (in terms of patients health, both patient and professional satisfaction and cost-effectiveness. Still, integrated care is seen as a core strategy in the sustainability of health and care provision in most societies in Europe and beyond. More specifically, at present, there is neither clear evidence on transferable factors of integrated care success nor a method for determining how to establish these specific success factors. The drawback of case methodology in this case, however, is that the in-depth results or lessons generated are usually highly context-specific and thus brings the challenge of transferability of findings to other settings, as different health care systems and different indications are often not comparable. Project INTEGRATE, a European Commission-funded project, has been designed to overcome these problems; it looks into four chronic conditions in different European settings, under a common methodology framework (taking a mixed-methods approach to try to overcome the issue of context specificity and limited transferability. The common methodological framework described in this paper seeks to bring together the different case study findings in a way that key lessons may be derived and transferred between countries, contexts and patient-groups, where integrated care is delivered in order to provide insight into generalisability and build on existing evidence in this field.Methodology: To compare the different integrated care experiences, a mixed-methods approach has

  9. A planning study project of developing an integral reactor (SMART)

    Energy Technology Data Exchange (ETDEWEB)

    Kang, C. S.; Kim, B. S.; Park, K. C. [Korea Nuclear Society, Taejeon (Korea)

    2001-06-01

    Since July of 1997, Korea Atomic Energy Research Institute (Korea Atomic Energy Research Institute) has been developing the conceptual and basic designs of a small- and medium- sized reactor called SMART (System integrated Modular Advanced ReacTor). SMART is a 330MWt integral type pressurized water reactor which will be used not only for electricity generation but also for cogeneration, district heating and seawater desalination. The conceptual design was already completed in March of 1999, and the basic design is on-going, which will be finished by March of 2002. In order for the Government to make a decision whether the project of developing SMART should continue to be supported beyond the design phase, before the completion of its basic design in March 2002, it has decided to go through a systematic interim assessment of the current status of the project of SMART development. Hence, the specific objectives of this planning study are to review the technical soundness of the present SMART design, estimate the cost of completing its development, assess the economic incentives of its development in the future, and make necessary recommendations for the successful completion of the SMART development based on the results of technical review and economic evaluation. Based upon the results of technical review of the present design of SMART such as design appropriateness, licensibility, and equipment manufacturability, in general, it is concluded that there exist no fundamental problems in its design. However, for smooth licensing progress and eventual commercialization in the future, the following issues should be addressed: There are some unresolved safety issues found in the current design under existing licensing criteria such as violations of diverse reactivity control, SG in-service inspection, etc., which should be somehow resolved by either employing appropriate design changes or modifying existing licensing criteria through extensive discussion with regulatory

  10. Population Projections for Sparsely Populated Areas: Reconciling “Error” and Context

    Directory of Open Access Journals (Sweden)

    Andrew Taylor

    2014-01-01

    Full Text Available Population projections are increasingly utilised as tools for understanding and modelling the economic, social, and environmental futures of sparsely populated areas. This study examines issues around “fit for purpose” for the application of projections to remote contexts. We focus on projections made for the Northern Territory of Australia, a jurisdiction in the north of the country, to assess the relative accuracy of projections over time. The results conclusively demonstrate the reduced accuracy of remote population projections. Nevertheless, the exercise of comparing and contrasting the accuracy of projections provides a useful lens for understanding demographic and other issues which necessitate that approaches for developing and utilising projections can and should be different in sparsely populated areas. We provide examples of alternative approaches to projections and the analysis of errors which researchers and analysts in sparsely populated areas might apply to other jurisdictions.

  11. Priorities for the preparation and implementation of strategic mega-projects involving new hydrocarbon areas of the Arctic coast

    Directory of Open Access Journals (Sweden)

    Tatarkin A. I.

    2015-09-01

    Full Text Available The progress and further ways of development of new hydrocarbon resources in the Arctic coast of the Yamal Peninsula have been considered. It has been shown that the involvement of new resource areas in economic use must be based on the priority of achieving strategic objectives, be integrated and focused on the effects of technological modernization of the Russian economy. The adequate form of development can become the strategic mega-projects based mainly on domestic technology and equipment. As a key example the project of creating wind-hydrogen energy in the Far North has been analyzed

  12. Radiation Target Area Sample Environmental Chamber (RTASEC) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Payload Systems Inc. proposes the Radiation Target Area Sample Environmental Chamber (RTASEC) as an innovative approach enabling radiobiologists to investigate the...

  13. PROGRESS IN HANFORDS DOUBLE SHELL TANK (DST) INTEGRITY PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    BERMAN HS

    2008-01-22

    The U.S. Department of Energy's Office of River Protection has an extensive integrity assessment program for the Hanford Site Double-Shell Tank System. The DOE Orders and environmental protection regulations provide the guidelines for the activities used to inspect and maintain 28 double-shell tanks (DSTs), the waste evaporator, and ancillary equipment that compose this system. This program has been reviewed by oversight and regulatory bodies and found to comply with the established guidelines. The basis for the DOE Order 435.1-1 for tank integrity comes from the Tank Structural Integrity Paneled by Brookhaven National Laboratory during the late 1990s. These guidelines established criteria for performing Non-Destructive Examination (NDE), for acceptance of the NDE results, for waste chemistry control, and for monitoring the tanks. The environmental regulations mirror these requirements and allow for the tank integrity program to provide compliant storage of the tanks. Both sets of requirements provide additional guidance for the protection of ancillary equipment. CH2M HILL uses two methods of NDE: visual inspection and Ultrasonic Testing (UT). The visual inspection program examines the primary tank and secondary liner of the DST. The primary tank is examined both on the interior surface above the waste in the tank and on the exterior surface facing the annulus of the DST. The interior surface of the tank liner is examined at the same time as the outer surface of the primary tank. The UT program examines representative areas of the primary tank and secondary liner by deploying equipment in the annulus of the tank. Both programs have led to the development of new equipment for remote inspection of the tanks. Compact camera and enhanced lighting systems have been designed and deployed through narrow access ports (called risers) into the tanks. The UT program has designed two generations of crawlers and equipment for deployment through risers into the thermally

  14. Integrated coastal area management: The case of India

    Digital Repository Service at National Institute of Oceanography (India)

    Swamy, G.N.

    Typical developing nations like India have accelerated activities in the field of industries, shipping, ports, fishing, mining, urbanisation and tourism. All these affect the coastal areas. Coastal zone takes the brunt of industrial pressure...

  15. Technical issues for wind energy integration in power systems: projections in Italy

    Energy Technology Data Exchange (ETDEWEB)

    Pantaleo, A.; Pellerano, A.; Trovato, M.

    2003-12-01

    This paper is review of the main technical issues of wind energy integration in power systems. After summarizing the main factors affecting this integration and reviewing the analytical studies that have been carried out, the perspectives for growth in Italy are investigated. The wind power penetration projections for Italy show that the installed wind capacity should be in the range of 3,000 - 5,000 MW by 2010, with a wind power penetration level of 4.5 to 7% of peak demand. Even if, at a global level, no substantial problems in power system operation are expected, the high concentration of the Italian wind energy resource in a few areas in Southern Italy, Sicily and Sardinia Regions, can cause grid integration difficulties. In fact, new transmission networks should be built to connect this dispersed energy source to the power system. Moreover, the large wind penetration expected in isolated areas, such as in Sardinia Island, can cause load-following and regulation problems, especially during low-load periods and morning ramp-up or evening drop-off hours. These issues should be taken into account to avoid the risk of wind generation curtailments. (author)

  16. Collaborative Teaching and Learning through Multi-Institutional Integrated Group Projects

    Science.gov (United States)

    Long, Suzanna K.; Carlo, Héctor J.

    2013-01-01

    This teaching brief describes an innovative multi-institutional initiative through which integrated student groups from different courses collaborate on a common course project. In this integrated group project, students are asked to design a decentralized manufacturing organization for a company that will manufacture industrial Proton-Exchange…

  17. Towards the automotive HMI of the future: Overview of the AIDE - Integrated project results

    NARCIS (Netherlands)

    Amditis, A.; Andreone, L.; Pagle, K.; Markkula, G.; Deregibus, E.; Romera Rue, M.; Bellotti, F.; Engelsberg, A.; Brouwer, R.; Peters, B.; Gloria, A. de

    2010-01-01

    The Adaptive Integrated Driver-vehicle interfacE (AIDE) is an integrated project funded by the European Commission in the Sixth Framework Programme. The project, which involves 31 partners from the European automotive industry and academia, deals with behavioral and technical issues related to autom

  18. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  19. The Influence of Nationalism in Mercosur and in South America - can the regional integration project survive?

    DEFF Research Database (Denmark)

    Christensen, Steen Fryba

    2007-01-01

    The article discusses if the tendency towards nationalism in Latin America seems to get in the way of the regional integration project in Mercosur and at the level of South America......The article discusses if the tendency towards nationalism in Latin America seems to get in the way of the regional integration project in Mercosur and at the level of South America...

  20. Integrating multicriteria evaluation and stakeholders analysis for assessing hydropower projects

    International Nuclear Information System (INIS)

    The use of hydroelectric potential and the protection of the river ecosystem are two contrasting aspects that arise in the management of the same resource, generating conflicts between different stakeholders. The purpose of the paper is to develop a multi-level decision-making tool, able to support energy planning, with specific reference to the construction of hydropower plants in mountain areas. Starting from a real-world problem concerning the basin of the Sesia Valley (Italy), an evaluation framework based on the combined use of Multicriteria Evaluation and Stakeholders Analysis is proposed in the study. The results of the work show that the methodology is able to grant participated decisions through a multi-stakeholders traceable and transparent assessment process, to highlight the important elements of the decision problem and to support the definition of future design guidelines. - Highlights: • The paper concerns a multi-level decision-making tool able to support energy planning. • The evaluation framework is based on the use of AHP and Stakeholders Analysis. • Hydropower projects in the Sesia Valley (Italy) are evaluated and ranked in the study. • Environmental, economic, technical and sociopolitical criteria have been considered. • 42 stakeholder groups have been included in the evaluation

  1. A Simulation Integrated Investment Project Ranking and Selection Approach

    Directory of Open Access Journals (Sweden)

    Ozgur YALCINKAYA

    2012-07-01

    Full Text Available Enterprises are confronted with several project alternatives that they assume to gain revenue in the future, but their own economical resources are limited to carry out all alternatives. Therefore, a decision process arises to prioritize and select among alternatives according to the predetermined goals and criteria to reach the maximum utilization. On the other hand, in project evaluation, the values of project parameters are often assumed to be known with complete certainty. However, project parameters normally change during a life cycle of the project, and it is necessary to consider uncertainty and risk phenomena while evaluating projects. Simulation-based project evaluation approaches enable to make more reliable investment decision since they permit to include future uncertainty and risk in analysis process. In this article, a novel simulation-based optimal decision approach is proposed for evaluating and comparing investment projects under uncertain and/or risky environments. The phases of the proposed approach are; (a developing the effectiveness measure formulation of a project, (b identifying and checking all controllable project parameters that affect the measure, (c developing simulation model for the measure, and (d performing the project ranking and selection procedures in order to rank and select the projects. Three ranking and selection procedures, previously used for comparing performances of the different production/service systems, are embedded in the proposed approach.

  2. Using models in Integrated Ecosystem Assessment of coastal areas

    Science.gov (United States)

    Solidoro, Cosimo; Bandelj, Vinko; Cossarini, Gianpiero; Melaku Canu, Donata; Libralato, Simone

    2014-05-01

    Numerical Models can greatly contribute to integrated ecological assessment of coastal and marine systems. Indeed, models can: i) assist in the identification of efficient sampling strategy; ii) provide space interpolation and time extrapolation of experiemtanl data which are based on the knowedge on processes dynamics and causal realtionships which is coded within the model, iii) provide estimates of hardly measurable indicators. Furthermore model can provide indication on potential effects of implementation of alternative management policies. Finally, by providing a synthetic representation of an ideal system, based on its essential dynamic, model return a picture of ideal behaviour of a system in the absence of external perturbation, alteration, noise, which might help in the identification of reference behaivuor. As an important example, model based reanalyses of biogeochemical and ecological properties are an urgent need for the estimate of the environmental status and the assessment of efficacy of conservation and environmental policies, also with reference to the enforcement of the European MSFD. However, the use of numerical models, and particularly of ecological models, in modeling and in environmental management still is far from be the rule, possibly because of a lack in realizing the benefits which a full integration of modeling and montoring systems might provide, possibly because of a lack of trust in modeling results, or because many problems still exists in the development, validation and implementation of models. For istance, assessing the validity of model results is a complex process that requires the definition of appropriate indicators, metrics, methodologies and faces with the scarcity of real-time in-situ biogeochemical data. Furthermore, biogeochemical models typically consider dozens of variables which are heavily undersampled. Here we show how the integration of mathematical model and monitoring data can support integrated ecosystem

  3. Integral Radiators for Next Generation Thermal Control Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Integral radiators integrate the primary structural system and the thermal rejection system into a dual function subsystem allowing for reduced weight. The design...

  4. Choosing the Right Integrator for Your Building Automation Project.

    Science.gov (United States)

    Podgorski, Will

    2002-01-01

    Examines the prevailing definitions and responsibilities of product, network, and system integrators for building automation systems; offers a novel approach to system integration; and sets realistic expectations for the owner in terms of benefits, outcomes, and overall values. (EV)

  5. Chip-scale Integrated Silica Ring Optical Gyro Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The next generation of space systems can benefit greatly by reduced c-SWaP integrated gyroscopes. By using photonic integration, it is possible to fit the entire...

  6. Human projected area factors for detailed direct and diffuse solar radiation analysis

    DEFF Research Database (Denmark)

    Kubaha, K.; Fiala, D.; Toftum, Jørn;

    2004-01-01

    Projected area factors for individual segments of the standing and sedentary human body were modelled for both direct and diffuse solar radiation using detailed 3D geometry and radiation models. The local projected area factors with respect to direct short-wave radiation are a function of the solar...

  7. INTEGRATED GASIFICATION COMBINED CYCLE PROJECT 2 MW FUEL CELL DEMONSTRATION

    Energy Technology Data Exchange (ETDEWEB)

    FuelCell Energy

    2005-05-16

    With about 50% of power generation in the United States derived from coal and projections indicating that coal will continue to be the primary fuel for power generation in the next two decades, the Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCTDP) has been conducted since 1985 to develop innovative, environmentally friendly processes for the world energy market place. The 2 MW Fuel Cell Demonstration was part of the Kentucky Pioneer Energy (KPE) Integrated Gasification Combined Cycle (IGCC) project selected by DOE under Round Five of the Clean Coal Technology Demonstration Program. The participant in the CCTDP V Project was Kentucky Pioneer Energy for the IGCC plant. FuelCell Energy, Inc. (FCE), under subcontract to KPE, was responsible for the design, construction and operation of the 2 MW fuel cell power plant. Duke Fluor Daniel provided engineering design and procurement support for the balance-of-plant skids. Colt Engineering Corporation provided engineering design, fabrication and procurement of the syngas processing skids. Jacobs Applied Technology provided the fabrication of the fuel cell module vessels. Wabash River Energy Ltd (WREL) provided the test site. The 2 MW fuel cell power plant utilizes FuelCell Energy's Direct Fuel Cell (DFC) technology, which is based on the internally reforming carbonate fuel cell. This plant is capable of operating on coal-derived syngas as well as natural gas. Prior testing (1992) of a subscale 20 kW carbonate fuel cell stack at the Louisiana Gasification Technology Inc. (LGTI) site using the Dow/Destec gasification plant indicated that operation on coal derived gas provided normal performance and stable operation. Duke Fluor Daniel and FuelCell Energy developed a commercial plant design for the 2 MW fuel cell. The plant was designed to be modular, factory assembled and truck shippable to the site. Five balance-of-plant skids incorporating fuel processing, anode gas oxidation, heat recovery

  8. Hydrologic Resources Management Program and Underground Tests Area Project FY 2003 Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    J., B C; F., E G; K., E B; L., F D; J., H L; Max, H; Bryant, H G; B., K A; E., M J; A., P G; P., R T; K., S D; F.B., T A; W., W R; Mavrik, Z; Pihong, Z

    2004-08-17

    This report describes FY 2003 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area (UGTA) Project. These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The present report is organized on a topical basis and contains five chapters that reflect the range of technical work performed by LLNL-CBND during FY 2003. Although we have emphasized investigations that were led by CBND, we also participated in a variety of collaborative studies with other UGTA and HRMP contract organizations including the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN).

  9. Hydrologic Resources Management Program and Underground Test Area Project FY2005 Progress Report

    International Nuclear Information System (INIS)

    This report describes FY 2005 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains five chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E and E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN)

  10. New Approach for forest inventory estimation and timber harvesting planning in mountain areas: the SLOPE project

    Directory of Open Access Journals (Sweden)

    F. Prandi

    2016-06-01

    Full Text Available Forests represent an important economic resource for mountainous areas being for a few region and mountain communities the main form of income. However, wood chain management in these contexts differs from the traditional schemes due to the limits imposed by terrain morphology, both for the operation planning aspects and the hardware requirements. In fact, forest organizational and technical problems require a wider strategic and detailed level of planning to reach the level of productivity of forest operation techniques applied on flatlands. In particular, a perfect knowledge of forest inventories improves long-term management sustainability and efficiency allowing a better understanding of forest ecosystems. However, this knowledge is usually based on historical parcel information with only few cases of remote sensing information from satellite imageries. This is not enough to fully exploit the benefit of the mountain areas forest stocks where the economic and ecological value of each single parcel depends on singletree characteristics. The work presented in this paper, based on the results of the SLOPE (Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas project, investigates the capability to generate, manage and visualize detailed virtual forest models using geospatial information, combining data acquired from traditional on-the-field laser scanning surveys technologies with new aerial survey through UAV systems. These models are then combined with interactive 3D virtual globes for continuous assessment of resource characteristics, harvesting planning and real-time monitoring of the whole production.

  11. Hydrologic Resources Management Program and Underground Test Area Project FY2005 Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Eaton, G F; Genetti, V; Hu, Q; Hudson, G B; Kersting, A B; Lindvall, R E; Moran, J E; Nimz, G J; Ramon, E C; Rose, T P; Shuller, L; Williams, R W; Zavarin, M; Zhao, P

    2007-03-23

    This report describes FY 2005 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains five chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN).

  12. New Approach for forest inventory estimation and timber harvesting planning in mountain areas: the SLOPE project

    Science.gov (United States)

    Prandi, F.; Magliocchetti, D.; Poveda, A.; De Amicis, R.; Andreolli, M.; Devigili, F.

    2016-06-01

    Forests represent an important economic resource for mountainous areas being for a few region and mountain communities the main form of income. However, wood chain management in these contexts differs from the traditional schemes due to the limits imposed by terrain morphology, both for the operation planning aspects and the hardware requirements. In fact, forest organizational and technical problems require a wider strategic and detailed level of planning to reach the level of productivity of forest operation techniques applied on flatlands. In particular, a perfect knowledge of forest inventories improves long-term management sustainability and efficiency allowing a better understanding of forest ecosystems. However, this knowledge is usually based on historical parcel information with only few cases of remote sensing information from satellite imageries. This is not enough to fully exploit the benefit of the mountain areas forest stocks where the economic and ecological value of each single parcel depends on singletree characteristics. The work presented in this paper, based on the results of the SLOPE (Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas) project, investigates the capability to generate, manage and visualize detailed virtual forest models using geospatial information, combining data acquired from traditional on-the-field laser scanning surveys technologies with new aerial survey through UAV systems. These models are then combined with interactive 3D virtual globes for continuous assessment of resource characteristics, harvesting planning and real-time monitoring of the whole production.

  13. A Fire Detector for Monitoring Inaccessible Areas in Aircrafts Project

    Data.gov (United States)

    National Aeronautics and Space Administration — En'Urga Inc. will evaluate the feasibility of utilizing reflected, multi-wavelength, near infrared radiation for detecting fires in inaccessible areas within...

  14. Novel Surveillance Technologies for Airport Ramp Area Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of the current research is to develop the concept, algorithms and software necessary for enabling a novel surveillance system for airports ramp areas....

  15. Environmental Assessment for Small- and Medium-Scale Road Projects Implemented in Local Authority Areas: A Case Study from Thailand

    Directory of Open Access Journals (Sweden)

    Suparb Trethanya

    2009-11-01

    Full Text Available In developing countries like Thailand, an Environmental Assessment (EA is conducted only for projects prescribed by environmental legislation. Numerous projects, especially those that are small- and medium-scale in size and scope, are implemented in areas by a local authority without any type of EA. Based on a comparative analysis of the environmental status of large-, medium- and small-scale road development projects implemented by a local authority in Thailand, this paper attempts to justify the enforcement of EAs for medium- and small-scale projects. The justification is mainly based on theperceptions of people affected by these projects. Environmental impact scores, computed on the basis of people’s perceptions, reveal that, irrespective of the size of a project, the impacts caused by different sized projects are perceived as similar. Since every development project is implemented for the purpose of human development, this paper proposes to integrate environmental screening and initial EAs into the existing development control measures enforced by urban planning regulations and laws.

  16. Integrated geophysical surveys on railroads in permafrost areas

    Institute of Scientific and Technical Information of China (English)

    A Ivanov; S Klepikova; M Shirobokov; A Urusova; A Savin

    2013-01-01

    The zones of thawed ground in the permafrost area are most dangerous from engineer-geologist effect point of view. Detection of such zones, as making forecast of their movement is the main task of engineer-geologist survey been held in railway industry. This paper presents general issues concerning railway construction and operation in permafrost areas. Comprehensive geophysical methods to monitor the development of thawed soils are considered in detail. The main physical parameters which help define permafrost and thawed soil patches are described. Author of current paper pointed out main factors, allowing predicting potential areas of development of thawed grounds. They offered set non-destructive methods:GPR investigations, seismic survey and elec-tric exploration. Whole sets of geophysical data:electric resistivity, velocity of S-wave and P-wave (and their correlation), allow us with high confidence specify characteristics and state of soil either under the line of road, or near it. At the same time the meth-od allows to predict direction of further development of thawed ground area.

  17. Integrated Evaluation and Its Application on Decision-Making of Comprehensive Transportation Projects

    Institute of Scientific and Technical Information of China (English)

    LI Xue-mei; ZHANG Tao

    2005-01-01

    The comprehensive transportation project involves with many different transportation methods, such as railway, highway, waterway, airline, and pipeline, which have their special characteristics. To evaluate the transportation project with different transportation methods under the same system, the integrated evaluation method should be built up on the basis of a common index system. This paper suggests a feasible integrated evaluation method including index system establishing, indices transacting, the index weight distributing, and weighted value integrating.

  18. Integrable System and Motion of Curves in Projective and Similarity Geometries

    Institute of Scientific and Technical Information of China (English)

    HOU Yu-Qing

    2006-01-01

    Based on the naturalitame in the projective geometry, motions of curves in projective geometry are studied.It is shown that several integrable equations including Sawada-Kotera and KK equations arise from motion of plane curves in projective geometries. Motion of space curves described by acceleration feld and governed by endowing an extra space variable in similarity geometry p3 is also studied.

  19. An Integrated Risk Management Model for Source Water Protection Areas

    OpenAIRE

    Shang-Lien Lo; Pei-Te Chiueh; Wei-Ting Shang

    2012-01-01

    Watersheds are recognized as the most effective management unit for the protection of water resources. For surface water supplies that use water from upstream watersheds, evaluating threats to water quality and implementing a watershed management plan are crucial for the maintenance of drinking water safe for humans. The aim of this article is to establish a risk assessment model that provides basic information for identifying critical pollutants and areas at high risk for degraded water qual...

  20. A framework for integrating heterogeneous clinical data for a disease area into a central data warehouse.

    Science.gov (United States)

    Karmen, Christian; Ganzinger, Matthias; Kohl, Christian D; Firnkorn, Daniel; Knaup-Gregori, Petra

    2014-01-01

    Structured collection of clinical facts is a common approach in clinical research. Especially in the analysis of rare diseases it is often necessary to aggregate study data from several sites in order to achieve a statistically significant cohort size. In this paper we describe a framework how to approach an integration of heterogeneous clinical data into a central register. This enables site-spanning queries for the occurrence of specific clinical facts and thus supports clinical research. The framework consists of three sequential steps, starting from a formal data harmonization process, to the data transformation methods and finally the integration into a proper data warehouse. We implemented reusable software templates that are based on our best practices in several projects in integrating heterogeneous clinical data. Our methods potentially increase the efficiency and quality for future data integration projects by reducing the implementation effort as well as the project management effort by usage of our approaches as a guideline.

  1. City of Huntsville Public Housing Areas STEM Initiative Project

    Science.gov (United States)

    Colon, Tomeka; Smith, Cydale; Pugh, Marcus; Budak, Satilmis; Muntele, Claudiu

    2012-02-01

    Students in high-poverty and high-minority schools are entering the classroom without the knowledge and skills they need to succeed. In order to bridge the gaps in opportunity and achievement that separate low-income students and students of color from other young Americans, we have introduced elementary and middle school students to the basic concepts of biology, chemistry, physics, and engineering. Within the project, we have provided students with excellent learning opportunities, engaging hands-on experiences, and outstanding advising and mentoring. We have assessed student development and impact before, during, and after the program.

  2. Technical Area V (TA-V) transformation project close-out report.

    Energy Technology Data Exchange (ETDEWEB)

    2010-07-01

    Sandia National Laboratories (SNL) Technical Area V (TA-V) has provided unique nuclear experimental environments for decades. The technologies tested in TA-V facilities have furthered the United States Nuclear Weapons program and has contributed to the national energy and homeland security mission. The importance of TA-V working efficiently to produce an attractive and effective platform for experiments should not be underestimated. Throughout its brief history, TA-V has evolved to address multiple and diverse sets of requirements. These requirements evolved over many years; however, the requirements had not been managed nor communicated comprehensively or effectively. A series of programmatic findings over several years of external audits was evidence of this downfall. Today, these same requirements flow down through a new TA-V management system that produces consistently applied and reproducible approaches to work practices. In 2008, the TA-V department managers assessed the state of TA-V services and work activities to understand how to improve customer interfaces, stakeholders perceptions, and workforce efficiencies. The TA-V management team initiated the TA-V Transformation Project after they deemed the pre-June 2008 operational model to be ineffective in managing work and in providing integrated, continuous improvement to TA-V processes. This report summarizes the TA-V Transformation Project goals, activities, and accomplishments.

  3. 75 FR 48986 - Northwest Area Water Supply Project, North Dakota

    Science.gov (United States)

    2010-08-12

    ... the surface water supplies within the service area are insufficient from both a quality and quantity... Scoping Meetings MSU-Bottineau, Nelson Science Center Room 125, 105 Simrall Boulevard, Bottineau, ND Sleep... of the proposed action is to provide a reliable source of high quality treated water to...

  4. 75 FR 49518 - Northwest Area Water Supply Project, North Dakota

    Science.gov (United States)

    2010-08-13

    ... the surface water supplies within the service area are insufficient from both a quality and quantity... MSU-Bottineau, Nelson Science Center Room 125, 105 Simrall Boulevard, Bottineau, ND. Sleep Inn--Inn... of the proposed action is to provide a reliable source of high quality treated water to...

  5. Integrated Computational System for Electrochemical Device Design and Simulation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Illinois Rocstar LLC proposes to develop and demonstrate the use of an integrated computational environment and infrastructure for electrochemical device design and...

  6. Integrated Visualization Environment for Science Mission Modeling Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed work will provide NASA with an integrated visualization environment providing greater insight and a more intuitive representation of large technical...

  7. Aircraft Structural Analysis, Design Optimization, and Manufacturing Tool Integration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Innovative research is proposed in integrating fundamental aircraft design processes with an emphasis on composite structures. Efficient, lightweight composite...

  8. Tsetse flies: their biology and control using area-wide integrated pest management approaches.

    Science.gov (United States)

    Vreysen, Marc J B; Seck, Momar Talla; Sall, Baba; Bouyer, Jérémy

    2013-03-01

    Tsetse flies are the cyclical vectors of trypanosomes, the causative agents of 'sleeping sickness' or human African trypanosomosis (HAT) in humans and 'nagana' or African animal trypanosomosis (AAT) in livestock in Sub-saharan Africa. Many consider HAT as one of the major neglected tropical diseases and AAT as the single greatest health constraint to increased livestock production. This review provides some background information on the taxonomy of tsetse flies, their unique way of reproduction (adenotrophic viviparity) making the adult stage the only one easily accessible for control, and how their ecological affinities, their distribution and population dynamics influence and dictate control efforts. The paper likewise reviews four control tactics (sequential aerosol technique, stationary attractive devices, live bait technique and the sterile insect technique) that are currently accepted as friendly to the environment, and describes their limitations and advantages and how they can best be put to practise in an IPM context. The paper discusses the different strategies for tsetse control i.e. localised versus area-wide and focusses thereafter on the principles of area-wide integrated pest management (AW-IPM) and the phased-conditional approach with the tsetse project in Senegal as a recent example. We argue that sustainable tsetse-free zones can be created on Africa mainland provided certain managerial and technical prerequisites are in place.

  9. Projecting crop yield in northern high latitude area.

    Science.gov (United States)

    Matsumura, Kanichiro

    2014-01-01

    Changing climatic conditions on seasonal and longer time scales influence agricultural production. Improvement of soil and fertilizer is a strong factor in agricultural production, but agricultural production is influenced by climate conditions even in highly developed countries. It is valuable if fewer predictors make it possible to conduct future projections. Monthly temperature and precipitation, wintertime 500hPa geopotential height, and the previous year's yield are used as predictors to forecast spring wheat yield in advance. Canadian small agricultural divisions (SAD) are used for analysis. Each SAD is composed of a collection of Canadian Agricultural Regions (CAR) of similar weather and growing conditions. Spring wheat yields in each CAR are forecast from the following variables: (a) the previous year's yield, (b) earlier stages of the growing season's climate conditions and, (c) the previous year's wintertime northern hemisphere 500hPa geopotential height field. Arctic outflow events in the Okanagan Valley in Canada are associated with episodes of extremely low temperatures during wintertime. Principal component analysis (PCA) is applied for wintertime northern hemisphere 500hPa geopotential height anomalies. The spatial PCA mode1 is defined as Arctic Oscillation and it influences prevailing westerlies. The prevailing westerlies meanders and influences climatic conditions. The spatial similarity between wintertime top 5 Arctic outflow event year's composites of 500hPa geopotential height anomalies and mode 3's spatial pattern is found. Mode 3's spatial pattern looks like the Pacific/North American (PNA) pattern which describes the variation of atmospheric circulation pattern over the Pacific Ocean and North America. Climate conditions from April to June, May to July, mode 3's time coefficients, and previous year's yield are used for forecasting spring wheat yield in each SAD. Cross-validation procedure which generates eight sets of models for the eight

  10. An integrative framework for managing project issues across stakeholder groups

    NARCIS (Netherlands)

    van Offenbeek, Marjolein A.G.; Vos, Janita F.J.

    2016-01-01

    The stakeholders and the issues associated with a project are different concepts but closely interconnected. Despite this, the project stakeholder management literature falls short in analyzing the linkages between the stakeholders and the issues they bring. This paper develops a multilayered stakeh

  11. Integrating Social and Traditional Media in the Client Project

    Science.gov (United States)

    Melton, James; Hicks, Nancy

    2011-01-01

    Based on a client project assigned to students in two undergraduate business classes, this article argues that social media learning is best done in a context that mixes social media with more traditional kinds of media. Ideally, this approach will involve teams of students who are working on different aspects of a larger client project. This…

  12. Use of geographic information systems and spatial analysis in area-wide integrated pest management programmes that integrate the sterile insect technique

    International Nuclear Information System (INIS)

    The advantages that geographic information systems (GIS) and associated technologies can offer, in terms of the design and implementation of area-wide programmes of insect and/or disease suppression, are becoming increasingly recognised, even if the realization of this potential has not been fully exploited and for some area-wide programmes adoption appears to be progressing slowly. This chapter provides a basic introduction to the science of GIS, Global Positioning System (GPS), and satellite remote sensing (RS), and reviews the principal ways in which these technologies can be used to assist various stages of development of the sterile insect technique (SIT) as part of area-wide integrated pest management (AW-IPM) programmes - from the selection of project sites, and feasibility assessments and planning of pre-intervention surveys, to the monitoring and analysis of insect suppression programmes, and the release of sterile insects. Potential barriers to the successful deployment of GIS tools are also discussed. (author)

  13. China’s Largest Integrated Aluminum Project to Be Constructed in Yulin,Shaanxi Province

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    <正> With an estimated investment of RMB 11.5 bil-lion,the country’s largest coal-power-aluminum integrated production project will beconstructed in Yulin,Sha’anxi Province.It ispreliminarily decided to locate the project siteat Jinjitan Town,Yuyang District of YulinCity,and construction of the project is to beundertaken by China Aluminum Corporation.As auxiliary constructions of the project,theHanglaiwan Coal Mine with an annual coal

  14. Conceptual Model for Assessing the Minimum Size Area for an Area-Wide Integrated Pest Management Program

    International Nuclear Information System (INIS)

    A conceptual model was developed based on the two basic spatial elements of area-wide integrated pest management (AW-IPM), a core area and a buffer zone, to determine the minimum size of the protected area for the program to be technically feasible and economically justifiable. The model consisted of a biological part (insect dispersal) and an economic part. The biological part used random walks and diffusion equations to describe insect dispersal and to determine the minimum width of the buffer zone required to protect the core area from immigration of pests from outside. In the economic part, the size of the core area was calculated to determine the point at which the revenues from the core area equal the control costs. This model will need to be calibrated and validated for each species and geographic location. Tsetse flies and the Mediterranean fruit fly are used as case studies to illustrate the model. (author)

  15. Potential areas for AIJ [Activities Implemented Jointly] projects in Kenya

    Energy Technology Data Exchange (ETDEWEB)

    Omulo, Monica A. [Climate Network Africa, Nairobi (Kenya)

    1998-09-01

    This paper identifies three sectors where AIJ could bring tangible benefits to Kenya as well as massive benefits to the environment in terms of greenhouse gas emissions reduction. The energy sector is one of the potential areas for AIJ activities. Kenya has few developed domestic energy sources, despite the potential, little attention has been paid in the past to the potential for domestic energy from existing renewable resources. There is potential for exploration of existing renewable energy resources using decentralized small scale renewable energy technologies based on wind and solar power. The other area is the transport sector which has a wide variety of proven options including increasing affordable public transport, by discouraging private car use, shifting freight from road to rail. The possible participants include local and international private industries and Government. For instance, the private industry could set up urban car clinics to fine-tune engines for more efficient operations, raise public awareness, save fuel and foreign exchange. The third potential sector for AIJ is the production industry. This requires modernization of the polluting industries using environmentally friendly technologies. There is great potential for the sectors to contribute to greenhouse gas emissions reduction. Kenya should therefore take advantage of the development potential offered in AIJ/JI by focusing attention primarily on sectors such as energy, transport, and industry and promote science and technology in these areas. (author)

  16. Integrated urban water management for residential areas: a reuse model.

    Science.gov (United States)

    Barton, A B; Argue, J R

    2009-01-01

    Global concern over growing urban water demand in the face of limited water resources has focussed attention on the need for better management of available water resources. This paper takes the "fit for purpose" concept and applies it in the development of a model aimed at changing current practices with respect to residential planning by integrating reuse systems into the design layout. This residential reuse model provides an approach to the design of residential developments seeking to maximise water reuse. Water balance modelling is used to assess the extent to which local water resources can satisfy residential demands with conditions based on the city of Adelaide, Australia. Physical conditions include a relatively flat topography and a temperate climate, with annual rainfall being around 500 mm. The level of water-self-sufficiency that may be achieved within a reuse development in this environment is estimated at around 60%. A case study is also presented in which a conventional development is re-designed on the basis of the reuse model. Costing of the two developments indicates the reuse scenario is only marginally more expensive. Such costings however do not include the benefit to upstream and downstream environments resulting from reduced demand and discharges. As governments look to developers to recover system augmentation and environmental costs the economics of such approaches will increase.

  17. Rehabilitation of Sao Sebastiao-Cubatao oil pipeline: integrated planning and action - key for project success

    Energy Technology Data Exchange (ETDEWEB)

    Serodio, Conrado J.M. [GDK S.A., Salvador, BA (Brazil)

    2009-12-19

    The execution of the OSBAT 24{sup o}il pipeline rehabilitation project, comprising the substitution of a 30 km section of the 37 years old pipeline has become a real benchmark in the history of this kind of job. The pipeline is inserted in one of the most sensitive environmental areas of the Sao Paulo State - the last Environmental Protection Area of the Mata Atlantica . The growth of human presence in its surroundings during the last three decades, has caused the right-of-way to be totally confined by luxury housing developments, streets, highways and resorts, as well as by the local communities and their activities, schools, and commerce. The pipeline runs through the Serra do Mar unstable mountain range slopes, with sequences of very steep hills and ravines followed by swamps and rivers. The success of such a challenging project - assembling the new line in a narrow ROW with all its restrictions, where the old line was still in operation, and complying with the tight work schedule required by PETROBRAS, was only possible due to a carefully managed combination of: accurate planning, best engineering methods and equipment and experienced workforce, deeply integrated in a massive effort towards safety, environmental care and social responsibility. (author)

  18. Environmental Baseline Characteristics for a Pilot Project Site for Integrated Solid Waste Management in Makurdi, Nigeria

    Directory of Open Access Journals (Sweden)

    S.V. Irtwange

    2009-10-01

    Full Text Available The study of the pilot project site for integrated solid waste management in Makurdi, Nigeria wasconducted to establish the environmental baseline characteristics as part of an Environmental ImpactAssessment (EIA process. Survey of literature was conducted to generate information on climate, geology, andthe general physical, chemical and biological status of the environment as well as identify information gaps.This was achieved through the consultation of existing studies/survey reports, technical publications, textbooks,etc. Field data gathering exercise was conducted to fill information gap identified from desk survey and alsoto validate existing information. It entailed visual observation, interviews, on-site measurements and collectionof samples for laboratory analysis and testing. The study covered terrain/topography, climate and meteorology,land ownership, land use and zoning, soil quality, geological formations underneath the project site, hydrologyand water quality, groundwater geophysical survey, hydro geology, ambient air quality, ecology of the projectsite and surroundings, baseline noise levels and public consultation. The results of the study indicates that theenvironmental components of the site were within natural background levels of the environment except theoutcrops of the Makurdi sandstone in the designated land fill areas having served as a road constructionexcavation site in the past. The study also shows that apart from the nearby stream, there are no existingenvironmental stresses or pollution within the area.

  19. Offshore 3D seismic, geochemical data integration, Main Pass project, Gulf of Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Belt, J.Q. Jr.; Rice, G.K. [GeoFrontiers Corp., Dallas, TX (United States)

    1996-04-01

    A bottom cable, 3D seismic, and shallow piston-core geochemical survey was conducted in summer 1992 on Main Pass Blocks 41 and 58 in the Gulf of Mexico. The 15.5 sq mile study area is in 11--24 m (36--79 ft) of water. Two hundred seventy-six shallow, 2 m piston-core sediment samples were collected using a uniform grid pattern on 400 m (1,320 ft) spaced intervals. Retrieved sediment samples were immediately sealed in metal 1 pt cans containing biocide solution. The purpose of the 3D seismic survey and geochemical offshore data integration project was three-fold: determine if near-shore, low-cost shallow piston-core sediment samples would be affected by fluvial contamination; evaluate the efficiency of a shallow-core, dense-grid sample design program in detecting thermogenic hydrocarbons at depth; evaluate the benefits of integrating offshore, shallow sediment geochemistry with 3D seismic data in developing a petroleum geological model. All 3D seismic survey data and block boundaries, as described in illustrations and figures, are only generally located within the Main Pass Area.

  20. Integrating Prognostics in Automated Contingency Management Strategies for Advanced Aircraft Controls Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Automated Contingency Management (ACM) is an emerging and game-changing area of engineering and scientific research that integrates prognostics and health...

  1. Reliable iris localization using integral projection function and 2D-shape properties

    Institute of Scientific and Technical Information of China (English)

    Farmanullah Jan; Imran Usman; Shahrukh Agha

    2012-01-01

    Iris recognition technology recognizes a human based on his/her iris pattern.However,the accuracy of the iris recognition technology depends on accurate iris localization.Localizing a pupil region in the presence of other low-intensity regions,such as hairs,eyebrows,and eyelashes,is a challenging task.This study proposes an iris localization technique that includes a localizing pupillary boundary in a sub-image by using an integral projection function and two-dimensional shape properties (e.g.,area,geometry,and circularity).The limbic boundary is localized using gradients and an error distance transform,and the boundary is regularized with active contours.Experimental results obtained from public databases show the superiority of the proposed technique over contemporary methods.

  2. Method for Assessing the Integrated Risk of Soil Pollution in Industrial and Mining Gathering Areas.

    Science.gov (United States)

    Guan, Yang; Shao, Chaofeng; Gu, Qingbao; Ju, Meiting; Zhang, Qian

    2015-11-01

    Industrial and mining activities are recognized as major sources of soil pollution. This study proposes an index system for evaluating the inherent risk level of polluting factories and introduces an integrated risk assessment method based on human health risk. As a case study, the health risk, polluting factories and integrated risks were analyzed in a typical industrial and mining gathering area in China, namely, Binhai New Area. The spatial distribution of the risk level was determined using a Geographic Information System. The results confirmed the following: (1) Human health risk in the study area is moderate to extreme, with heavy metals posing the greatest threat; (2) Polluting factories pose a moderate to extreme inherent risk in the study area. Such factories are concentrated in industrial and urban areas, but are irregularly distributed and also occupy agricultural land, showing a lack of proper planning and management; (3) The integrated risks of soil are moderate to high in the study area.

  3. Method for Assessing the Integrated Risk of Soil Pollution in Industrial and Mining Gathering Areas

    Directory of Open Access Journals (Sweden)

    Yang Guan

    2015-11-01

    Full Text Available Industrial and mining activities are recognized as major sources of soil pollution. This study proposes an index system for evaluating the inherent risk level of polluting factories and introduces an integrated risk assessment method based on human health risk. As a case study, the health risk, polluting factories and integrated risks were analyzed in a typical industrial and mining gathering area in China, namely, Binhai New Area. The spatial distribution of the risk level was determined using a Geographic Information System. The results confirmed the following: (1 Human health risk in the study area is moderate to extreme, with heavy metals posing the greatest threat; (2 Polluting factories pose a moderate to extreme inherent risk in the study area. Such factories are concentrated in industrial and urban areas, but are irregularly distributed and also occupy agricultural land, showing a lack of proper planning and management; (3 The integrated risks of soil are moderate to high in the study area.

  4. Method for Assessing the Integrated Risk of Soil Pollution in Industrial and Mining Gathering Areas.

    Science.gov (United States)

    Guan, Yang; Shao, Chaofeng; Gu, Qingbao; Ju, Meiting; Zhang, Qian

    2015-11-01

    Industrial and mining activities are recognized as major sources of soil pollution. This study proposes an index system for evaluating the inherent risk level of polluting factories and introduces an integrated risk assessment method based on human health risk. As a case study, the health risk, polluting factories and integrated risks were analyzed in a typical industrial and mining gathering area in China, namely, Binhai New Area. The spatial distribution of the risk level was determined using a Geographic Information System. The results confirmed the following: (1) Human health risk in the study area is moderate to extreme, with heavy metals posing the greatest threat; (2) Polluting factories pose a moderate to extreme inherent risk in the study area. Such factories are concentrated in industrial and urban areas, but are irregularly distributed and also occupy agricultural land, showing a lack of proper planning and management; (3) The integrated risks of soil are moderate to high in the study area. PMID:26580644

  5. Numerical modeling in photonic crystals integrated technology: the COPERNICUS Project

    DEFF Research Database (Denmark)

    Malaguti, Stefania; Armaroli, Andrea; Bellanca, Gaetano;

    2011-01-01

    Photonic crystals will play a fundamental role in the future of optical communications. The relevance of the numerical modeling for the success of this technology is assessed by using some examples concerning the experience of the COPERNICUS Project....

  6. Integrated Modeling, Analysis, and Verification for Space Missions Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This project will further MBSE technology in fundamental ways by strengthening the link between SysML tools and framework engineering execution environments....

  7. Sustaining Jamaica's forests: The protected areas resource conservation project

    Science.gov (United States)

    Berke, Philip R.; Beatley, Timothy

    1995-07-01

    This study examines Jamaica's attempt to protect a tropical forest reserve. The biophysical setting, and the types and magnitude of forest development pressures are reviewed. Next, Jamaica's approach to developing new land-use strategies and compatible environmental protection and economic development programs are examined. Finally, the practical and theoretical implications by which institutions can be designed to encourage planning for sustainable development are reviewed. The implications suggest how to provide an appropriate mix of cooperation and market competition, by which people acting in their own interests accomplish socially equitable economic development, while protecting the environment for the benefit of future generations. The experience illustrates that effective long-term protection of natural areas requires the building of local relationships and support, the development of local economic activities supportive of conservation, the defining of clear boundaries, and significant monitoring and enforcement. Long-term protection of the Blue and John Crow mountains, and other important natural areas of Jamaica, will also require the development of a workable and enforceable system of land-use planning for the island, and adjustments to the economic incentive structure so that sustainable, nonextractive uses of natural capital are placed on equal footing with other economic uses (e.g., coffee production).

  8. Integrated project delivery methods for energy renovation of social housing

    OpenAIRE

    Tadeo Baldiri Salcedo Rahola

    2015-01-01

    Optimised project delivery methods forsocial housing energy renovationsEuropean Social Housing Organisations (SHOs) are currently facing challenging times. The ageing of their housing stock and the economic crisis, which has affected both their finances and the finances of their tenants, are testing their capacity to stick to their aim of providing decent and affordable housing. Housing renovation projects offer the possibility of upgrading the health and comfort levels of their old housing s...

  9. Canby Area Service Project substation and associated transmission line

    International Nuclear Information System (INIS)

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ''environmental impact statement'' is not required

  10. Damage Adaptation Using Integrated Structural, Propulsion, and Aerodynamic Control Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed SBIR Phase I plan of research seeks to develop and demonstrate an integrated architecture designed to compensate for combined propulsion, airframe,...

  11. Risk Informed Design Using Integrated Vehicle Rapid Assessment Tools Project

    Data.gov (United States)

    National Aeronautics and Space Administration — A successful proof of concept was performed in FY 2012 integrating the Envision tool for parametric estimates of vehicle mass and the Rapid Response Risk Assessment...

  12. Integrated Sensing and Control of Aeroelastic Deformation (ISCAD) Toolbox Project

    Data.gov (United States)

    National Aeronautics and Space Administration — An Integrated Sensing and Control of Aeroelastic Deformation (ISCAD) Toolbox is proposed. Specif-ically, this toolbox will provide a methodology, both hardware and...

  13. Network Centric Transponders for Airspace Integration of UAVs Project

    Data.gov (United States)

    National Aeronautics and Space Administration — A method and device for situational awareness for unmanned air vehicles is presented. This enables integration of UAVs into the national airspace in a safe manner,...

  14. Network Centric Transponders for Airspace Integration of UAVs Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The need for a small, lightweight, remotely-operable transponder for UAVs is identified. This would allow integration of UAVs into the national airspace while...

  15. Integrated Damage-Adaptive Control System (IDACS) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — SSCI, in collaboration with Boeing Phantom Works, proposes to develop and test an efficient Integrated Damage Adaptive Control System (IDACS). The proposed system...

  16. Integrated Damage-Adaptive Control System (IDACS) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — SSCI proposes to further develop, implement and test the damage-adaptive control algorithms developed in Phase I within the framework of an Integrated Damage...

  17. Integrated Visualization Environment for Science Mission Modeling Project

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA is emphasizing the use of larger, more integrated models in conjunction with systems engineering tools and decision support systems. These tools place a...

  18. Hybrid Integrated Photonics for Ultrahigh Throughput Optical Signal Processing Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Structured Materials Industries, Inc. and Cornell University propose to develop high speed integrated photonic switches and WDM for LIDAR applications. The team has...

  19. Integrated head area design of KNGR to reduce refueling outage duration

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woo Tae; Park, Chi Yong; Kim, In Hwan; Kim, Dae Woong [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    In the design of KNGR (Korea Next Generation Reactor), we believe that economy is one of the most important factors to be considered. Thus, we reviewed and evaluated the consequences of designing the head area into an integrated package from an economical point of view. The refueling outage durations of the nuclear power plants currently in operation in Korea, some having and others not having integrated head package, are compared. This paper discusses the characteristics of head area design and the critical design issues of KNGR head area to evaluate the effect of the head area characteristics on the outage duration. 8 refs., 4 figs. (Author)

  20. Water Resource Inventory and Assessment (WRIA) - Iowa Corridor Project Area (Port Louisa NWR)

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Water Resource Inventory and Assessment (WRIA) Summary Report for Iowa Corridor Project Area describes current hydrologic information, provides an assessment...

  1. Weighted $L^p$ estimates for the area integral associated to self-adjoint operators

    OpenAIRE

    Gong, Ruming; Yan, Lixin

    2011-01-01

    This article is concerned with some weighted norm inequalities for the so-called horizontal (i.e. involving time derivatives) area integrals associated to a non-negative self-adjoint operator satisfying a pointwise Gaussian estimate for its heat kernel, as well as the corresponding vertical (i.e. involving space derivatives) area integrals associated to a non-negative self-adjoint operator satisfying in addition a pointwise upper bounds for the gradient of the heat kernel. As applications, we...

  2. Collection of entomological baseline data for tsetse area-wide integrated pest management programmes

    OpenAIRE

    Leak, Stephen G. A.; Vreysen, M.J.B.; Ejigu, Dejene

    2015-01-01

    Area-wide integrated pest management (AW-IPM) entails the integration of different control tactics against an entire pest population within a circumscribed area, while given adequate attention to human health and the environment. For most insect pests including tsetse, AW-IPM results in more sustainable pest control and the concept has gained significantly in importance in the last decade. These guidelines provide, aside from some basic information on the biology of tsetse flies, guidance o...

  3. The Partnership between Project Management and Organizational Change: Integrating Change Management with Change Leadership

    Science.gov (United States)

    Griffith-Cooper, Barber; King, Karyl

    2007-01-01

    The nature of project management is change. Even though all knowledge areas in the Project Management Body of Knowledge (PMBOK) are rooted in controlling change, none of these areas specifically addresses the human elements of change. There is a significant distinction between directly controlling change relative to the nonhuman aspects of a…

  4. Sustainable Urban Waters: Opportunities to Integrate Environmental Protection in Multi-objective Projects

    Science.gov (United States)

    Abstract: Nonpoint source pollution is an ongoing challenge for environmental agencies who seek to protect waters of the U.S. Urban stream and waterfront redevelopment projects present opportunities to achieve integrated environmental, economic, and social benefits in urban water...

  5. Advanced Data Mining and Deployment for Integrated Vehicle Health Management and the Space Vehicle Lifecycle Project

    Data.gov (United States)

    National Aeronautics and Space Administration — In a successful Phase 1 project for NASA SBIR topic A1.05, "Data Mining for Integrated Vehicle Health Management," Michigan Aerospace Corporation (MAC) demonstrated...

  6. The Maricopa Integrated Risk Assessment Project: A New Way of Looking at Risk

    Science.gov (United States)

    Unks, Ruth A.; Thor, Linda

    2008-01-01

    This article reviews the Maricopa Integrated Risk Assessment (MIRA) project and discusses its challenges and successes. Strategies and resources are offered for assisting community college administrators, faculty, and staff to successfully implement enterprise risk management at their institutions.

  7. Onboard Space Autonomy Through Integration of Health Management and Control Reconfiguration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — In this SBIR project we propose to integrate spacecraft control and vehicle health functions to improve the robustness and productivity of space operations. The...

  8. High-Resolution Silicon-based Particle Sensor with Integrated Amplification Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR Phase I project will deliver a breakthrough in particle-detection sensors, by integrating an amplifying junction as part of the detector topology....

  9. Final technical report for DOE Computational Nanoscience Project: Integrated Multiscale Modeling of Molecular Computing Devices

    Energy Technology Data Exchange (ETDEWEB)

    Cummings, P. T.

    2010-02-08

    This document reports the outcomes of the Computational Nanoscience Project, "Integrated Multiscale Modeling of Molecular Computing Devices". It includes a list of participants and publications arising from the research supported.

  10. Integrated Collision Avoidance Enhanced GN&C System for Smart Air Vehicles Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this SBIR Phase I project is to develop and demonstrate a low cost, lightweight, miniaturized Integrated Collision Avoidance Enhanced GN&C...

  11. Integrated Reconfigurable Aero and Propulsion Control for Improved Flight Safety of Commercial Aircraft Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The main objective of this project is to develop and test a novel innovative Integrated Reconfigurable Aero & Propulsion Control (IRAP) system that achieves...

  12. 49 CFR 195.452 - Pipeline integrity management in high consequence areas.

    Science.gov (United States)

    2010-10-01

    ...; (viii) Exposure of the pipeline to operating pressure exceeding established maximum operating pressure... 49 Transportation 3 2010-10-01 2010-10-01 false Pipeline integrity management in high consequence... Management § 195.452 Pipeline integrity management in high consequence areas. (a) Which pipelines are...

  13. Educational Planning Methodology for the Integrated Development of Rural Areas. Reports Studies... S.83.

    Science.gov (United States)

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    A summary of educational planning methodologies tested in Argentina, Guatemala, Brazil, Ecuador, and Bolivia, the document offers opinions and proposals about integrated rural development. Integrated rural development is seen as a social, economic, political, and cultural process in rural areas, designed to improve living conditions. Chapters…

  14. CALIFA, the Calar Alto Legacy Integral Field Area survey : II. First public data release

    NARCIS (Netherlands)

    Husemann, B.; Jahnke, K.; Sanchez, S. F.; Barrado, D.; Bekeraite, S.; Bomans, D. J.; Castillo-Morales, A.; Catalan-Torrecilla, C.; Cid Fernandes, R.; Falcon-Barroso, J.; Garcia-Benito, R.; Gonzalez Delgado, R. M.; Iglesias-Paramo, J.; Johnson, B. D.; Kupko, D.; Lopez-Fernandez, R.; Lyubenova, M.; Marino, R. A.; Mast, D.; Miskolczi, A.; Monreal-Ibero, A.; Gil de Paz, A.; Perez, E.; Perez, I.; Rosales-Ortega, F. F.; Ruiz-Lara, T.; Schilling, U.; van de Ven, G.; Walcher, J.; Alves, J.; de Amorim, A. L.; Backsmann, N.; Barrera-Ballesteros, J. K.; Bland-Hawthorn, J.; Cortijo, C.; Dettmar, R. -J.; Demleitner, M.; Diaz, A. I.; Enke, H.; Florido, E.; Flores, H.; Galbany, L.; Gallazzi, A.; Garcia-Lorenzo, B.; Gomes, J. M.; Gruel, N.; Haines, T.; Holmes, L.; Jungwiert, B.; Kalinova, V.; Kehrig, C.; Kennicutt, R. C.; Klar, J.; Lehnert, M. D.; Lopez-Sanchez, A. R.; de Lorenzo-Caceres, A.; Marmol-Queralto, E.; Marquez, I.; Mendez-Abreu, J.; Molla, M.; del Olmo, A.; Meidt, S. E.; Papaderos, P.; Puschnig, J.; Quirrenbach, A.; Roth, M. M.; Sanchez-Blazquez, P.; Spekkens, K.; Singh, R.; Stanishev, V.; Trager, S. C.; Vilchez, J. M.; Wild, V.; Wisotzki, L.; Zibetti, S.; Ziegler, B.

    2013-01-01

    We present the first public data release (DR1) of the Calar Alto Legacy Integral Field Area (CALIFA) survey. It consists of science-grade optical datacubes for the first 100 of eventually 600 nearby (0.005 integral-field spectrograph PMAS/PPak mounted on the 3.5

  15. Innovative Work Practices and Lessons Learned at the N Area Deactivation Project

    International Nuclear Information System (INIS)

    This report identifies many of the lessons learned, innovations,and effective work practices that derived from activities supporting the N Area Deactivation Project at the U.S. Department of Energy's (DOE) Hanford Site. The work practices discussed in this report may be applicable and beneficial to similar projects throughout the DOE complex

  16. Test Area North Pool Stabilization Project: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The Test Area North (TAN) Pool is located within the fenced TAN facility boundaries on the Idaho National Engineering Laboratory (INEL). The TAN pool stores 344 canisters of core debris from the March, 1979, Three Mile Island (TMI) Unit 2 reactor accident; fuel assemblies from Loss-of-Fluid Tests (LOFT); and Government-owned commercial fuel rods and assemblies. The LOFT and government owned commercial fuel rods and assemblies are hereafter referred to collectively as {open_quotes}commercial fuels{close_quotes} except where distinction between the two is important to the analysis. DOE proposes to remove the canisters of TMI core debris and commercial fuels from the TAN Pool and transfer them to the Idaho Chemical Processing Plant (ICPP) for interim dry storage until an alternate storage location other than at the INEL, or a permanent federal spent nuclear fuel (SNF) repository is available. The TAN Pool would be drained and placed in an industrially and radiologically safe condition for refurbishment or eventual decommissioning. This environmental assessment (EA) identifies and evaluates environmental impacts associated with (1) constructing an Interim Storage System (ISS) at ICPP; (2) removing the TMI and commercial fuels from the pool and transporting them to ICPP for placement in an ISS, and (3) draining and stabilizing the TAN Pool. Miscellaneous hardware would be removed and decontaminated or disposed of in the INEL Radioactive Waste Management Complex (RWMC). This EA also describes the environmental consequences of the no action alternative.

  17. Integrating Phosphorus Movement with Soil and Water Loss in the Daily Erosion Project

    Science.gov (United States)

    Sklenar, Tim; Perez-Bidegain, Mario; Cruse, Richard; Gelder, Brian; Herzmann, Daryl

    2016-04-01

    The Daily Erosion Project (DEP) is an ongoing modelling effort which is now in its second generation. DEP provides comprehensive and dynamic estimates of sediment delivery, soil erosion, and hill slope runoff for agricultural land areas across the Midwestern United States every day for Hydrologic Unit Code 12 (HUC 12) size watersheds. Results are posted every morning on the Internet at dailyerosion.org. Currently DEP covers all of Iowa and portions of Kansas and Minnesota, but expansion of coverage is ongoing. The integration of highly resolute spatial and temporal climate data, soil properties, crop rotation and residue management data affords the opportunity to test the effects of using multiple conservation practices on the transport and fate of water borne nutrients, especially phosphorus, on the Midwestern United States agricultural landscapes. Understanding the interaction of different environmental and land management practices on phosphorus movement will allow data from the DEP to guide conservation efforts as expansion continues into surrounding Midwestern states. The presentation will provide an overview of the DEP technology, including how input data are derived and used to make daily erosion estimates on over 200,000 flowpaths in the modelling area, as well as a discussion of the ongoing phosphorus transport modelling efforts and plans for future expansion (both land area and model functionality).

  18. The Impact of Organizational Knowledge Integrators on Cooperative R&D Projects

    DEFF Research Database (Denmark)

    Bulathsinhala, Nadika

    2014-01-01

    This paper addresses the fact that R&D projects that incorporate external knowledge sources not only depend on the number of sources, but also on integrating the right source. An organizational knowledge integrator has a natural interest due to its position in the value chain and the technology...... phase to pull the knowledge from earlier phases of development closer towards commercialization. The aim of the paper is to examine if organizational knowledge integrators in R&D projects have a positive impact on innovative performance compared to projects that do not involve a knowledge integrator....... The methodology approaches applied in the paper are both quantitative and qualitative. The findings show that knowledge integrators have an impact on innovative performance due to they have a significant impact on the development of new technology, innovative technology, scientific publications, and research....

  19. Impact-Based Area Allocation for Yield Optimization in Integrated Circuits

    Science.gov (United States)

    Abraham, Billion; Widodo, Arif; Chen, Poki

    2016-06-01

    In analog integrated circuit (IC) layout, area allocation is a very important issue for achieving good mismatch cancellation. However, most IC layout papers focus only on layout strategy to reduce systematic mismatch. In 2006, an outstanding paper presenting area allocation strategy was published to introduce technique for random mismatch reduction. Instead of using general theoretical study to prove the strategy, this research presented close-to-optimum simulations only on case-bycase basis. The impact-based area allocation for yield optimization in integrated circuits is proposed in this chapter. To demonstrate the corresponding strategy, not only a theoretical analysis but also an integral nonlinearity-based yield simulation will be given to derive optimum area allocation for binary weighted current steering digital-to-analog converter (DAC). The result will be concluded to convince IC designers how to allocate area for critical devices in an optimum way.

  20. Observed and Projected Climate Extremities in Chennai Metropolitan Area

    Science.gov (United States)

    Anushiya, j.; Andimuthu, R.

    2013-12-01

    Analyses of observed climate throughout world revealed some significant changes in the extremes. Any change in the frequency or severity of extreme climate events would have profound impacts on the resilience of nature and society. It is thus very important to analyze extreme events to reliably monitor and detect climate change. Chennai is the fourth largest metropolis in India and one of the fastest growing economic and Industrial growth centers in South Asia. Population has grown rapidly in the last 20 years due to its major industrialization and tremendous growth. Already Chennai's day and night time Temperature shows an increasing trend. The past incidence of catastrophic flooding was observed in the city due to heavy rains associated with depressions and cyclonic storm lead floods in major rivers. After 2000, the incidents were reported repeatedly. The effort has made in this study to find the observed climate extremities over the past years and in the future. For observed changes, IMD gridded data set, and station data are used. Future high resolution climate scenarios (0.220x0.220) are developed through RCM using PRECIS. The boundary data have provided by the UK Met office. The selected members are simulated under the A1B scenario (a mid range emission scenario) for a continuous run till 2100. Climate indices listed by Expert Team (ET) on Climate Change Detection and Indices (ETCCDI) by the CLIVAR are considered in this study. The indices were obtained using the software package RClimDex. Kendall's tau based slope estimator has been used to find the significance lavel. The results shows the significant increasing tendency of warm days (TX90P) in the past and in future. The trends in extreme wet days (R99P) are also increased. The growth in population, urban and industrial area, economic activities, depletion of natural resources along with changing climate are forced to develop the infrastructure includes climate friendly policies to adopt and to ensure the

  1. Developing an open source-based spatial data infrastructure for integrated monitoring of mining areas

    Science.gov (United States)

    Lahn, Florian; Knoth, Christian; Prinz, Torsten; Pebesma, Edzer

    2014-05-01

    allows an easy exploration of the data to assess its quality and suitability for a specific task. More complex remote sensing image analysis is performed through 3rd party software, which is dynamically integrated into a Web Processing Service (WPS). With an increasing data volume the transmission becomes a key problem for a WPS processing this raster data. Here the Moving Code principle embedded in the 52North WPS implementation (MÜLLER et al. 2013) is applied to engage this problem by flexibly sending processes to the WPS which is directly coupled with the data on a server. The required parameters to control the processing are entered via an interface within the web portal. The Moving Code approach not only contributes to improving web processing for big data sets but it also makes it easier to integrate external executable programs into a WPS. As a result the proposed framework of web services and a web portal successfully combines various open source technologies to integrate all of the gathered vector and raster data as well as the analysis methods developed during the GMES4Mining project into a spatial data infrastructure and to enable access to them through a web browser. References: BENECKE, N., ZIMMERMANN, K., MÜTERTHIES, A., PAKZAD, K., TEUWSEN, S., GARCÍA MILLÁN, V., KATELOE, J., PREUßE, A., PEBESMA, E. & T. PRINZ (2013): GMES4Mining: GMES-based geoservices for mining areas. In: Proceedings of the XV International ISM Congress, September 2013, Aachen, Germany. MÜLLER, M., BERNARD, L. & D. KADNER (2013): Moving code - Sharing geoprocessing logic on the Web. In: ISPRS Journal of Photogrammetry and Remote Sensing 83: 193-203.

  2. Learning in Authentic Contexts: Projects Integrating Spatial Technologies and Fieldwork

    Science.gov (United States)

    Huang, Kuo-Hung

    2011-01-01

    In recent years, professional practice has been an issue of concern in higher education. The purpose of this study is to design students' projects to facilitate collaborative learning in authentic contexts. Ten students majoring in Management Information Systems conducted fieldwork with spatial technologies to collect data and provided information…

  3. High Performance Computing tools for the Integrated Tokamak Modelling project

    Energy Technology Data Exchange (ETDEWEB)

    Guillerminet, B., E-mail: bernard.guillerminet@cea.f [Association Euratom-CEA sur la Fusion, IRFM, DSM, CEA Cadarache (France); Plasencia, I. Campos [Instituto de Fisica de Cantabria (IFCA), CSIC, Santander (Spain); Haefele, M. [Universite Louis Pasteur, Strasbourg (France); Iannone, F. [EURATOM/ENEA Fusion Association, Frascati (Italy); Jackson, A. [University of Edinburgh (EPCC) (United Kingdom); Manduchi, G. [EURATOM/ENEA Fusion Association, Padova (Italy); Plociennik, M. [Poznan Supercomputing and Networking Center (PSNC) (Poland); Sonnendrucker, E. [Universite Louis Pasteur, Strasbourg (France); Strand, P. [Chalmers University of Technology (Sweden); Owsiak, M. [Poznan Supercomputing and Networking Center (PSNC) (Poland)

    2010-07-15

    Fusion Modelling and Simulation are very challenging and the High Performance Computing issues are addressed here. Toolset for jobs launching and scheduling, data communication and visualization have been developed by the EUFORIA project and used with a plasma edge simulation code.

  4. The integrated hydroelectric uses in brazilian agricultural projects

    International Nuclear Information System (INIS)

    This work aims to analyse the advances for the implementation of PCH's in agricultural projects, and advice of interconnection with the local sub-transmission system, in order to maximize the return of the installation investing capital. Also a study case is presented. (author)

  5. Energy saving and emission reduction: A project of coal-resource integration in Shanxi Province, China

    International Nuclear Information System (INIS)

    The small or middle coal mines with illegal operations in developing countries or regions can cause bad energy waste and environmental disruption. The project of coal-resource integration in Shanxi Province of China gives a new idea or an approach to energy saving and emission reduction. It is a social- and economic-ecological project. The paper shows the targets of energy saving and emission reduction in Shanxi Province, and analyses the aims, significance, design process and implementation of the integration project. Based on that, the paper discusses the challenges and opportunities the project brings. The analysis shows that the project of coal-resource integration in developing countries or regions can effectively improve mining technologies, collect capital and impel international cooperation and exchange. Finally, the paper analyses the concerns about the future, including the possible problems of implementation period, industrial updating, environmental impact and re-employment. However, the successful integration of coal resources can mitigate energy crisis and climate crisis and promote cleaner production effectively. - Highlights: → Coal-resource integration gives a new idea or an approach to energy saving and emission reduction. → Coal-resource integration mitigates climate crisis and promotes cleaner production. → Coal-resource integration brings challenges and opportunities to traditional mining industries.

  6. The NADI program and the JOICFP integrated project: partners in delivering primary health care.

    Science.gov (United States)

    Arshat, H; Othman, R; Kuan Lin Chee; Abdullah, M

    1985-10-01

    The NADI program (pulse in Malay) was initially launched as a pilot project in 1980 in Kuala Lumpur, Malaysia. It utilized an integrated approach involving both the government and the private sectors. By sharing resources and expertise, and by working together, the government and the people can achieve national development faster and with better results. The agencies work through a multi-level supportive structure, at the head of which is the steering committee. The NADI teams at the field level are the focal points of services from the various agencies. Members of NADI teams also work with urban poor families as well as health groups, parents-teachers associations, and other similar groups. The policy and planning functions are carried out by the steering committee, the 5 area action committees and the community action committees, while the implementation function is carried out by the area program managers and NADI teams. The chairman of each area action committee is the head of the branch office of city hall. Using intestinal parasite control as the entry point, the NADI Integrated Family Development Program has greatly helped in expanding inter-agency cooperation and exchange of experiences by a coordinated, effective and efficient resource-mobilization. The program was later expanded to other parts of the country including the industrial and estate sectors. Services provided by NADI include: comprehensive health services to promote maternal and child health; adequate water supply, proper waste disposal, construction of latrines and providing electricity; and initiating community and family development such as community education, preschool education, vocational training, family counseling and building special facilities for recreational and educational purposes.

  7. Life Cycle Management for an Investment Project in Cluj-Salaj Area, Romania

    Directory of Open Access Journals (Sweden)

    Vasile Iuliu CIOMOŞ

    2011-02-01

    Full Text Available The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives. Regardless of scope or complexity, any project goes through a series of stages during its life. Authors’ experience in preparing and implementing investment projects in the water sector has led to several conclusions: there is first an identification phase, in which the outputs and critical success factors are defined, followed by a planning phase, characterized by breaking down the project into smaller tasks, an execution phase, in which the project plan is executed, and lastly a completion phase, that marks the closure and exit of the project. Investment project activities must be grouped into phases because by doing so, the project management and the core team can efficiently plan and organize resources for each activity, and also objectively measure achievement of the goals. This paper introduces several issues related to the Project Cycle Management for a large local infrastructure investment project in the Cluj- Sălaj area, Romania. Successfully managing the project cycle and making timely decisions at every stage (identification, planning, execution and sustainability require the Project Management Unit from the Cluj-Sălaj Water Company to constantly understand and adapt to strategic considerations, both external and internal.

  8. Initial comments on the aero geophysical information present at the B and C areas of the Itatira (Brazil) project; Comentarios iniciais sobre as informacoes aerogeofisicas presentes nas areas B e C do Projeto Itatira

    Energy Technology Data Exchange (ETDEWEB)

    Castro, Neivaldo Araujo de; Castelo Branco, Raimundo Mariano Gomes [Ceara Univ., Fortaleza, CE (Brazil). Dept. de Geologia. Lab. de Geofisica de Prospeccao e Sensoriamento Remoto

    1999-07-01

    The aero geophysical project called Itatira,, accomplished by LASA Engenharia e Prospeccoes S.A., Between September and November/1977 through contract with NUCLEBRAS, corresponds to one of the first project of this gender accomplished in national territory. In this project were flight more than 80 000 km of linear lines, which covered approximately 38 000 km{sup 2} on the precambrian terrains of the Ceara State, NE Brazil. For several reasons, the total area of the project was subdivided in three sub-areas (A, B and C), each one covered by a different airship (LAS, 1977). This paper presents the geophysical information and preliminary interpretations of the areas B and C that were obtained through the integrated use of the soft wares AUTOCAD r. 14, OASIS MONTAJ r.4.2 and ERMAPPER r.5.5. (author)

  9. An International Teacher Training Project: Integrating Subject Content, Communicative and Digital Competences in Didactic Materials

    Science.gov (United States)

    Sierra, Lina; Martin, Piedad

    2012-01-01

    The European intTT project "An Integral Teacher Training for Developing Digital and Communicative Competences and Subject Content Learning at Schools" deals with initial teacher training in primary and secondary School. The general objective of the project is to train future school teachers in order to improve the development of communicative and…

  10. Using the Student Research Project to Integrate Macroeconomics and Statistics in an Advanced Cost Accounting Course

    Science.gov (United States)

    Hassan, Mahamood M.; Schwartz, Bill N.

    2014-01-01

    This paper discusses a student research project that is part of an advanced cost accounting class. The project emphasizes active learning, integrates cost accounting with macroeconomics and statistics by "learning by doing" using real world data. Students analyze sales data for a publicly listed company by focusing on the company's…

  11. Geothermal engineering integrating mitigation of induced seismicity in reservoirs - The European GEISER project

    NARCIS (Netherlands)

    Bruhn, D.; Huenges, E.; Áǵustsson, K.; Zang, A.; Kwiatek, G.; Rachez, X.; Wiemer, S.; Wees, J.D.A.M. van; Calcagno, P.; Kohl, T.; Dorbath, C.; Natale, G. de; Oye, V.

    2011-01-01

    The GEISER (Geothermal Engineering Integrating Mitigation of Induced SEismicity in Reservoirs) project is co-funded by the European Commission to address the mitigation and understanding of induced seismicity (IS) in geothermal engineering. The aim of the project is to contribute to the improvement

  12. 75 FR 17397 - Hydrogen Energy California's Integrated Gasification Combined Cycle Project, Kern County, CA...

    Science.gov (United States)

    2010-04-06

    ... Hydrogen Energy California's Integrated Gasification Combined Cycle Project, Kern County, CA--Notice of... by Hydrogen Energy California LLC (HECA). DOE selected this project for an award of financial... produce synthesis gas (syngas), which would then be processed and purified to produce a hydrogen-rich...

  13. A quantitative flood risk analysis methodology for urban areas with integration of social research data

    Directory of Open Access Journals (Sweden)

    I. Escuder-Bueno

    2012-09-01

    Full Text Available Risk analysis has become a top priority for authorities and stakeholders in many European countries, with the aim of reducing flooding risk, considering the population's needs and improving risk awareness. Within this context, two methodological pieces have been developed in the period 2009–2011 within the SUFRI project (Sustainable Strategies of Urban Flood Risk Management with non-structural measures to cope with the residual risk, 2nd ERA-Net CRUE Funding Initiative. First, the "SUFRI Methodology for pluvial and river flooding risk assessment in urban areas to inform decision-making" provides a comprehensive and quantitative tool for flood risk analysis. Second, the "Methodology for investigation of risk awareness of the population concerned" presents the basis to estimate current risk from a social perspective and identify tendencies in the way floods are understood by citizens. Outcomes of both methods are integrated in this paper with the aim of informing decision making on non-structural protection measures. The results of two case studies are shown to illustrate practical applications of this developed approach. The main advantage of applying the methodology herein presented consists in providing a quantitative estimation of flooding risk before and after investing in non-structural risk mitigation measures. It can be of great interest for decision makers as it provides rational and solid information.

  14. Projects at the Component Development and Integration Facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the second quarter of FY94. The CDIF is a major US Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; Sodium Sulfide/Ferrous Sulfate Project; and Spray Casting Project.

  15. 75 FR 55736 - Mark Twain National Forest; Missouri; Integrated Non-Native Invasive Plant Project

    Science.gov (United States)

    2010-09-14

    ... Forest Service Mark Twain National Forest; Missouri; Integrated Non-Native Invasive Plant Project AGENCY... Mark Twain National Forest (MTNF) proposes to implement an integrated Forest-wide management strategy... Fairgrounds Road, Rolla, MO 65401. Comments may also be sent via e-mail to...

  16. Change and innovation in secondary education: «Integrated Projects» to build a shared understanding

    Directory of Open Access Journals (Sweden)

    Elena HERNÁNDEZ DE LA TORRE

    2011-04-01

    Full Text Available «Integrated Projects» are a new optional subject following the Decree 231/2007 of July 31th, establishing management and lessons for compulsory secondary education in Andalusia (boja, n.º 156, August 8th 2007, Orden of August 10th (boja n.º 171, August 30th 2007. These Integrated Projects are based on the idea that students will attend an elective practical and related to the maturity and personal development of students. In this work, we present a proposal to design and plan integrated projects to learn the necessary skills to carry out planning for this area where students have to use a practical knowledge of different subjects taught in their curriculum such as physics, mathematics, economics, language, etc. Students with this subject should be taught to different content courses taken to date to develop new knowledge. To give an adequate response to the students in the construction of new knowledge, we facilitate these connections through Projects to link the foreground and encourage their practical functionality. Teachers must plan for student learning, using teaching and organizational strategies to develop content in a practical way, regardless of knowledge tight plots and promote the development of interdisciplinary knowledge from their level of competence curriculum.

  17. The integrated project SOFC600 development of low-temperature SOFC

    DEFF Research Database (Denmark)

    Rietveld, B.; Van Berkel, F.; Zhang-Steenwinkel, Y.;

    2009-01-01

    The Integrated Project SOFC600 unites 21 partners jointly working on the research and development of SOFC stack components for operation at 600oC. The project is funded by the European Commission within the 6th Framework Programme. Low-temperature operation is considered essential for achieving...... commercial targets for lifetime and costs. This paper gives an overview of the activities in the project and of the main overall results achieved up to now....

  18. Analysis of Conflict Centers in Projects Procured with Traditional and Integrated Methods in Nigeria

    OpenAIRE

    Martin O. Dada

    2012-01-01

    Conflicts in any organization can either be functional or dysfunctional and can contribute to or detract from the achievement of organizational or project objectives. This study investigated the frequency and intensity of conflicts, using five conflict centers, on projects executed with either the integrated or traditional method in Nigeria. Questionnaires were administered through purposive and snowballing techniques on 274 projects located in twelve states of Nigeria and Abuja. 94 usable ...

  19. Integrated Manhattan Project for Excellence in Radiochemistry (IMPER)

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Jason

    2014-03-27

    Accomplishments are reported in these areas: single step radiolabeling of peptides with fluorine-18; photoreduction of 99Tc pertechnetate by nanometer-sized metal oxides for environmental remediation; synthesis and characterization of multi-modal CNT imaging constructs.

  20. Sizing of integrated energy systems in rural areas; Dimensionamento de sistemas integrados de energia em areas rurais

    Energy Technology Data Exchange (ETDEWEB)

    Nogueira, Carlos Eduardo Camargo [Universidade Estadual do Oeste do Parana (UNIOESTE), Cascavel, PR (Brazil). Centro de Ciencias Exatas e Tecnologicas], e-mail: cecn@correios.net.br; Zuern, Hans Helmut [Universidade Federal de Santa Catarina (UFSC), Florianopolis, SC (Brazil). Dept. de Energia Eletrica], e-mail: hans@labspot.ufsc.br

    2004-07-01

    The purpose of this work was to develop a new model for sizing integrated energy systems in rural areas, based on simulation techniques and linear programming, producing a system with minimum cost and high reliability level. The used reliability level was the loss of power supply probability (LPSP), for periods of consecutive hours. With the developed model, many simulations are accomplished with the parameters and sizing variables, making possible the analysis of different scenarios for the optimized energy systems. (author)

  1. Integrated project for increasing the capacity of spent fuel pools at Cofrentes NPP

    International Nuclear Information System (INIS)

    The current storage capacity of the Cofrentes NPP will have reached its limit by the end of its 15th cycle, in the year 2005. The works performed by Empresarios Agrupados for IBERDROLA show that it is possible to increase this capacity in successive phases, so as to make the Power Plant self-sufficient for 16 more years (up to 2021) in the case of compact storage, or for 50 more years (2055) in the case of consolidated storage or second level storage. Optimisation of the management of high-activity wastes goes with a series of tasks which come under the group referred to as Integrated Project for Increasing the Capacity of Spent Fuel Pools. The main activities of the project can be summarised under the following three items: increase of storage capacity (feasibility study, specification for the purchase of racks, manufacture, assembly and tests), improvement of the capacity of the pool cooling system and modification of the components and accessories located inside the pools which interfere with the new racks. Another series of activities with less technical and economic impact are: modification of fuel handling machines, management of generated radwaste, licensing and modification of plant documentation (seismic analysis, radiation areas, as-built drawings and verification of the validation of purification and HVAC systems). (Author)

  2. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  3. Continuous Integration and Quality Assurance: a case study of two open source projects

    OpenAIRE

    Jesper Holck; Niels Jørgensen

    2003-01-01

    A decentralized variant of continuous integration can be defined in terms of two fundamental rules: (1) Developers’ access to add contributions to the development version at any time, and (2) developers’ obligation to integrate their own contributions properly. Decentralized, continuous integration may adapt well to organizations where developers work relatively independently, as in many open source projects. The approach raises the issue of how these organizations can exercise central contro...

  4. Matera CITTÀ Narrata Project: AN Integrated Guide for Mobile Systems

    Science.gov (United States)

    Pietroni, E.; Borghini, S.; Carlani, R.; Rufa, C.

    2011-09-01

    Matera città Narrata is a project coordinated by CNR ITABC and financed by the Agency of Tourist Promotion of Basilicata region, aimed to the creation of a digital platform able to support the public before and during the visit of Matera (World Heritage since 1993), providing cultural contents by multiple communicative formats and access possibilities. The main components of the project are: 1) the web site, accessible in remote and adapted also from smartphone, 2) cultural contents and applications for mobile devices (old style mobile phone, smartphone, iPad) with different operative systems. Every user can reach cultural contents in a simple way, choosing the communicative format he prefers and supported by the technology he owns. The access is totally free for public. In this paper we'll describe, more in detail, the application developed for iPad.

  5. INTEGRATION OF ETWINNING PROJECTS IN GEOGRAPHY CURRICULUM. A CASE STUDY IN ROMANIA

    Directory of Open Access Journals (Sweden)

    GABRIELA CRIŞAN

    2014-01-01

    Full Text Available In this paper we aim at analyzing how this program can be utilized in developing the primary students’ skills through their involvement in school partnerships and integrated approach of the curriculum. The specific objectives were analyzing eTwinning; analyzing the design approach of eTwinning projects; analyzing the approach for achieving eTwinning projects; analysis of the eTwinning developed projects; analyzing how eTwinning projects can be integrated in the geography curriculum. The eTwinning program was officially launched in Brussels in 2005 as the main action of the European Commission’s eLearning Program. ETwinning addresses to primary and secondary school teachers and students. The program has a portal which is available in 25 languages. In 2014, there were 230,424 teachers, 31,946 schools and 115,324 school projects submitted on the platform. Romania joined the eTwinning Programme in 2007, with currently over 13,000 registered teachers, 5,781 enlisted schools, 1,152 ongoing and 5,293 completed projects. We analyzed the designing and achieving approaches for eTwinning projects. In the second part of this paper, we analyzed two projects achieved with primary school pupils: “Cultural Feast: Turda, Romania” and “The Adventures of Little Light Bulb through the World of Energy”. At the end of the paper, we presented several ways to integrate curriculum in eTwinning projects.

  6. Integrated Evaluation on Highway Engineering Geological Hazard in Mountainous Area of Enshi, Hubei

    Institute of Scientific and Technical Information of China (English)

    ZHAN Bin

    2006-01-01

    Aiming at the geological features of highway engineering in mountainous area of Enshi, Hubei Province, the principles to set up an integrated evaluation system for highway engineering geological hazard are formulated. Then, the integrated evaluation system for highway engineering geological hazard in mountainous area of Enshi is established. In the evaluation system, the first-level evaluation indices are geological development degree, geological conditions, and damaging power, whereas the second-level indices including key factors affecting main kinds of geological hazard. Meanwhile, the borders of indices are determined. At last, the method of Fuzzy Comprehensive Evaluation (FCE) is adopted to quantitatively evaluate the highway engineering geological hazard in mountainous area of Enshi.

  7. Communicating Astronomy in a Metropolis and Disaster Area - Activities of the Tenpla Project

    Science.gov (United States)

    Kamegai, K.; Takanashi, N.; Hiramatsu, M.; Naito, S.

    2015-03-01

    We present recent activities delivering astronomy to the public by the Tenpla project in Japan. One is voluntary activities in the disaster area of the Great East Japan Earthquake. The other is holding tens of star parties and public lectures in the central area of Tokyo.

  8. A Exploration Project Management of New-Area in South China,CNPC,Found in Hangzhou

    Institute of Scientific and Technical Information of China (English)

    Xia Wenhua

    1994-01-01

    @@ In order to speed up oil-gas exploration in new-area in South China, the Exploration Bureau,CNPC,has decided to set up a New Exploration Project Management in New-Area,South China(EPMNSC.)Its assignments are as follows:

  9. Integrated Project Scheduling and Staff Assignment with Controllable Processing Times

    OpenAIRE

    Victor Fernandez-Viagas; Framinan, Jose M.

    2014-01-01

    This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and staff assignment are closely related. An integer programming model for the problem is proposed, tog...

  10. Data-driven modelling of structured populations a practical guide to the integral projection model

    CERN Document Server

    Ellner, Stephen P; Rees, Mark

    2016-01-01

    This book is a “How To” guide for modeling population dynamics using Integral Projection Models (IPM) starting from observational data. It is written by a leading research team in this area and includes code in the R language (in the text and online) to carry out all computations. The intended audience are ecologists, evolutionary biologists, and mathematical biologists interested in developing data-driven models for animal and plant populations. IPMs may seem hard as they involve integrals. The aim of this book is to demystify IPMs, so they become the model of choice for populations structured by size or other continuously varying traits. The book uses real examples of increasing complexity to show how the life-cycle of the study organism naturally leads to the appropriate statistical analysis, which leads directly to the IPM itself. A wide range of model types and analyses are presented, including model construction, computational methods, and the underlying theory, with the more technical material in B...

  11. The Monetary Integration of the New Member States before the Euro Area Debt Crisis

    Directory of Open Access Journals (Sweden)

    Ivan Todorov

    2013-09-01

    Full Text Available This paper analyzes the process of monetary integration of the New Member States in the European Union till the beginning of the Euro Area debt crisis. The focus of investigation is on the nominal convergence (the fulfillment of the Maastricht criteria and on the satisfaction of the Optimum Currency Area criteria by the New Member States. More specifically, the trade integration, the financial integration, the output structure and the labor markets of the New Member States are explored from the standpoints of the Optimum Currency Area theory and in the context of the future membership of the New Member States in the Euro Area. The experience of the NMS, which have already adopted the Euro, is also reviewed.

  12. Project Orion, Environmental Control and Life Support System Integrated Studies

    Science.gov (United States)

    Russell, James F.; Lewis, John F.

    2008-01-01

    Orion is the next vehicle for human space travel. Humans will be sustained in space by the Orion subystem, environmental control and life support (ECLS). The ECLS concept at the subsystem level is outlined by function and technology. In the past two years, the interface definition with other subsystems has increased through different integrated studies. The paper presents the key requirements and discusses three recent studies (e.g., unpressurized cargo) along with the respective impacts on the ECLS design moving forward.

  13. The integral cohomology of configuration spaces of pairs of points in real projective spaces

    CERN Document Server

    Dominguez, Carlos; Landweber, Peter

    2011-01-01

    We compute the integral cohomology ring of configuration spaces of two points on a given real projective space. Apart from an integral class, the resulting ring is a quotient of the known integral cohomology of the dihedral group of order 8 (in the case of unordered configurations, thus has only 2- and 4-torsion) or of the elementary abelian 2-group of rank 2 (in the case of ordered configurations, thus has only 2-torsion). As an application, we complete the computation of the symmetric topological complexity of real projective spaces of dimensions of the form 2^i+j for non-negative i and j with j<3.

  14. Evaluation of Research Project on Integrated Management and Services of Urban Development Records, Archives, and Information

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    To evaluate the project "Research in integrated management and services of urban development records, archives, and information" in progress, this paper analyzes "why", "what", and "how" issues of relevant integration research about integrated management and services of urban development records, archives, and information based on a survey of literature at home and abroad. By a comparative study of current integration research status and features, the author gives a critical analysis of the strengths and weakness of the project and provides recommendations for future research.Cross disciplinary studies indicate that ideals of integration can add values to collaboration, innovation,and optimum in managing evidence, information, memory, and knowledge of built environment cross-culture, cross-discipline, cross-domain, and cross institution for enhancing competitiveness and productivity of business. Cross cultural studies indicate that integrated records, archives, and information management as a whole into capital construction project management process, organizational information resources management systems, and the construction of digital urban development archival repository through service-control, process-control, and product-control are fundamental to guarantee the characteristics and quality of records and records system to support evidence-based e-government,e-business, and the sustainability development of digital city. Present studies on integrated management and services of urban development records, archives, and information have limitations on too much emphasis on integration for collaboration and optimum but not enough studies on integration for innovation and broader use.

  15. Using Interdisciplinary, Project-Based, Multimodal Activities to Facilitate Literacy across the Content Areas

    Science.gov (United States)

    Hill, Archie E.

    2014-01-01

    Tour Across America is an interdisciplinary, project-based, multimodal (IPM) activity where students get the opportunity to apply what they learn to a real-life situation while illustrating the interdisciplinary nature of literacy. It provides students with a high-interest, creative platform to review, reinforce, and integrate learned literacy…

  16. Risk Assessment for Integration Project%集成项目中的风险评估

    Institute of Scientific and Technical Information of China (English)

    杨泉

    2012-01-01

    Project risk management is a critical section in project management knowledge framework, since this risk is uncertain and its impacts are varied. Based on analysis of the common risk management framework and by combining the features of integration project, a project risk assessment method for information system integration project is proposed.%在项目管理的多项活动中,项目风险管理是较难把握和管理的,因为风险是对可能情况的不确定性描述,而影响风险的因素又是多种多样的。文中通过风险管理的基本框架,结合系统集成项目的特点,提出了针对集成项目的风险评估方法。

  17. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  18. Integrated multidisciplinary fault observation in Marmara Through MARSite - Project Achievements

    Science.gov (United States)

    Meral Ozel, N.; Necmioglu, O.; Favali, P.; Ergintav, S.; Ozel, O.; Bigarré, P.; Géli, L.; Aochi, H.; Bossu, R.; Cakir, Z.; Zulfikar, C.; Sesetyan, K.; Douglas, J.

    2015-12-01

    This presentation provides overview of the achievements of the 3-year long EC/FP-7 MARSite Project started in November 2012, which aimed to coordinate research groups ranging from seismology to gas geochemistry in a comprehensive monitoring activity developed both in the Marmara Region based on collection of multidisciplinary data to be shared, interpreted and merged in consistent theoretical and practical models suitable for the implementation of good practices to move the necessary information to the end users in charge of seismic risk management of the region. In addition, processes involved in earthquake generation and the physics of short-term seismic transients, 4D deformations to understand earthquake cycle processes, fluid activity monitoring and seismicity under the sea floor using existing autonomous instrumentation, early warning and development of real-time shake and loss information, real- and quasi-real-time earthquake and tsunami hazard monitoring and earthquake-induced landslide hazard topics are also covered within MARSite. In particular, achievements and progress in the design and building of a multi-parameter borehole system consisting of very wide dynamic range and stable borehole (VBB) broad band seismic sensor, with incorporated 3-D strain meter, tilt meter, and temperature and local hydrostatic pressure measuring devices would be reported. This work is funded by the project MARsite - New Directions in Seismic Hazard assessment through Focused Earth Observation in the Marmara Supersite FP7-ENV.2012 6.4-2, Grant 308417.

  19. Continuous Integration and Quality Assurance: a case study of two open source projects

    Directory of Open Access Journals (Sweden)

    Jesper Holck

    2003-11-01

    Full Text Available A decentralized variant of continuous integration can be defined in terms of two fundamental rules: (1 Developers’ access to add contributions to the development version at any time, and (2 developers’ obligation to integrate their own contributions properly. Decentralized, continuous integration may adapt well to organizations where developers work relatively independently, as in many open source projects. The approach raises the issue of how these organizations can exercise central control, as attaining the benefits of continuous integration requires that contributions are useful and satisfy the project’s definition of successful integration. We have investigated the use of continuous integration in FreeBSD and Mozilla. Our account of quality assurance activities in the two open source projects distinguishes between Mintzberg’s three complementary forms of central control: Standardization and control of work output, work processes, and worker skills. Our study indicates that two major challenges face projects using decentralized, continuous integration: (1 To balance the access to add contributions against the need to stabilize and mature the software prior to a release, and (2 to consider the developers’ limited time and resources when interpreting their obligation to integrate their changes properly.

  20. INTEGRAL BENCHMARKS AVAILABLE THROUGH THE INTERNATIONAL REACTOR PHYSICS EXPERIMENT EVALUATION PROJECT AND THE INTERNATIONAL CRITICALITY SAFETY BENCHMARK EVALUATION PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    J. Blair Briggs; Lori Scott; Enrico Sartori; Yolanda Rugama

    2008-09-01

    Interest in high-quality integral benchmark data is increasing as efforts to quantify and reduce calculational uncertainties accelerate to meet the demands of next generation reactor and advanced fuel cycle concepts. The International Reactor Physics Experiment Evaluation Project (IRPhEP) and the International Criticality Safety Benchmark Evaluation Project (ICSBEP) continue to expand their efforts and broaden their scope to identify, evaluate, and provide integral benchmark data for method and data validation. Benchmark model specifications provided by these two projects are used heavily by the international reactor physics, nuclear data, and criticality safety communities. Thus far, 14 countries have contributed to the IRPhEP, and 20 have contributed to the ICSBEP. The status of the IRPhEP and ICSBEP is discussed in this paper, and the future of the two projects is outlined and discussed. Selected benchmarks that have been added to the IRPhEP and ICSBEP handbooks since PHYSOR’06 are highlighted, and the future of the two projects is discussed.

  1. Artificial Neural Network Model for Discrimination of Stability of Ancient Landslide in Impounding Area of Three Gorges Project, China

    Institute of Scientific and Technical Information of China (English)

    Zhou Pinggen

    2003-01-01

    The factors of geomorphology, geological setting, effect of ground water and environment dynamic factors (e. g. rainfall and artificial water recharge) should be integrated in the discrimination of the stability of the ancient landslide. As the criterion of landslide stability has been studied, the artificial neural network model was then applied to discriminate the stability of the ancient landslide in the impounding area of the Three Gorges project on the Yangtze River, China. The model has the property of self-adaptive identifying and integrating complex qualitative factors and quantitative factors. The results of the artificial neural network model are coincided well with what were gained by classical limit equilibrinm analysis (the Bishop method and Janbu method) and by other comprehensive discrimination methods.

  2. Technical Consensus and Integration between Transport and Territory: the Bagnoli Project

    Directory of Open Access Journals (Sweden)

    Carmela Fedele

    2011-02-01

    Full Text Available The paper wants to analyze a highly operative aspect of the interventions related to the Bagnoli Project and the extension of the subway line nr. 6 to Bagnoli. The two projects strictly integrate the urban transformation projects in the implementation of the mobility system. The two societies that realize the project are Bagnolifutura SpA Urban Transformation Society, and Ansaldo STS SpA. The first has the task to act the executive urban plan of Bagnoli-Coroglio; the latter is one of the main company in the global railway & mass transit transportation systems and it is licenseed for design and construction of the line nr 6. The paper, in the whole complex process, wants to analyze particularly the long coordination process among the subjects responsible for the various design and construction phases and the equally hard work necessary for the granting of approvals. In other words, the paper wants to show that the expected and/or obtained results in terms of land-transport integration come not only from a rigorous design process, but mainly from a structured, long and often difficult activity of technical consensus building. For this result many meetings are necessary , field tests, surveys, expert analysis, but also the definite time for closing the significant phases of the procedure, avoiding the risk of indefinite times for discussion, never compatible with the timing of the funding. The definition of the trackwork, for example, is a synthesis moment of many requirements that must be met; their acceptance is never immediate, but it is verified only after a recursive process that assembles one after the other the pieces of a mosaic. It is a team effort involving multiple disciplines and a large number of professionals; they must work in close contact, making sure that the information’s flow in the right way, that the taken decisions are transparent, clear, and that are known to all; everyone must have the availability to revise some of the

  3. Projects at the component development and integration facility. Quarterly technical progress report, April 1, 1994--June 30, 1994

    International Nuclear Information System (INIS)

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY94. The CDIF is a major Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; and Spray Casting Project

  4. Amyris, Inc. Integrated Biorefinery Project Summary Final Report - Public Version

    Energy Technology Data Exchange (ETDEWEB)

    Gray, David; Sato, Suzanne; Garcia, Fernando; Eppler, Ross; Cherry, Joel

    2014-03-12

    The Amyris pilot-scale Integrated Biorefinery (IBR) leveraged Amyris synthetic biology and process technology experience to upgrade Amyris’s existing Emeryville, California pilot plant and fermentation labs to enable development of US-based production capabilities for renewable diesel fuel and alternative chemical products. These products were derived semi-synthetically from high-impact biomass feedstocks via microbial fermentation to the 15-carbon intermediate farnesene, with subsequent chemical finishing to farnesane. The Amyris IBR team tested and provided methods for production of diesel and alternative chemical products from sweet sorghum, and other high-impact lignocellulosic feedstocks, at pilot scale. This enabled robust techno-economic analysis (TEA), regulatory approvals, and a basis for full-scale manufacturing processes and facility design.

  5. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-03-01

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is

  6. Balancing Area Coordination: Efficiently Integrating Renewable Energy Into the Grid, Greening the Grid

    Energy Technology Data Exchange (ETDEWEB)

    Katz, Jessica; Denholm, Paul; Cochran, Jaquelin

    2015-06-01

    Greening the Grid provides technical assistance to energy system planners, regulators, and grid operators to overcome challenges associated with integrating variable renewable energy into the grid. Coordinating balancing area operation can promote more cost and resource efficient integration of variable renewable energy, such as wind and solar, into power systems. This efficiency is achieved by sharing or coordinating balancing resources and operating reserves across larger geographic boundaries.

  7. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    Energy Technology Data Exchange (ETDEWEB)

    A. M. Tyson

    2006-08-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compenstion, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project.

  8. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    International Nuclear Information System (INIS)

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project

  9. Project Reptile!

    Science.gov (United States)

    Diffily, Deborah

    2001-01-01

    Integrating curriculum is important in helping children make connections within and among areas. Presents a class project for kindergarten children which came out of the students' interests and desire to build a reptile exhibit. (ASK)

  10. Tuberculosis in cattle: the results of the four-area project

    Directory of Open Access Journals (Sweden)

    Griffin John M

    2005-11-01

    Full Text Available The four-area project was undertaken to further assess the impact of badger removal on the control of tuberculosis in cattle herds in Ireland. It was conducted between 1997 and 2002 in matched removal and reference areas in four counties, namely Cork, Donegal, Kilkenny and Monaghan, representing a wide range of Irish farming environments. In the removal areas, a proactive programme of badger removal was conducted, on two or three occasions each year, whereas in the reference areas, badger removal was entirely reactive following severe outbreaks of tuberculosis amongst cattle. A detailed statistical analysis of this study has already been presented by Griffin et al. 13; this paper presents further, mainly descriptive, findings from the study. In total, 2,360 badgers were captured in the removal areas of which 450 (19.5% were considered positive for tuberculosis and 258 badgers were captured in the reference areas, with 57 (26.1% positive for tuberculosis. The annual incidence of confirmed herd restrictions was lower in the removal area compared to the reference area in every year of the study period in each of the four counties. These empirical findings were consistent with the hazard ratios found by Griffin et al. 13. Further, the effect of proactive badger removal on cattle tuberculosis in the four-area project and in the earlier east-Offaly project, as measured using the number of reactors per 1,000 cattle tested, were very similar, providing compelling evidence of the role of badgers in the epidemiology of tuberculosis in Irish cattle herds. The validity of the four-area project was discussed in detail. Efforts to minimise badger-to-cattle transmission in Ireland must be undertaken in association with the current comprehensive control programme, which has effectively minimised opportunities for cattle-to-cattle transmission.

  11. Conceptual basis for an integrated system for the management of a protected area. Examples from its application in a mediterranean area.

    Science.gov (United States)

    Cornejo, E; Fungairiño, S G; Barandica, J M; Serrano, J M; Zorrilla, J M; Gómez, T; Zapata, F J; Acosta, F J

    2016-01-15

    Improving the efficiency of management in protected areas is imperative in a generalized context of limited conservation budgets. However, this is overlooked due to flaws in problem definition, general disregard for cost information, and a lack of suitable tools for measuring costs and management quality. This study describes an innovative methodological framework, implemented in the web application SIGEIN, focused on maximizing the quality of management against its costs, establishing an explicit justification for any decision. The tool integrates, with this aim, a procedure for prioritizing management objects according to a conservation value, modified by a functional criterion; a project management module; and a module for management of continuous assessment. This appraisal associates the relevance of the conservation targets, the efficacy of the methods employed, both resource and personnel investments, and the resulting costs. Preliminary results of a prototypical SIGEIN application on the Site of Community Importance Chafarinas Islands are included. PMID:26513322

  12. Conceptual basis for an integrated system for the management of a protected area. Examples from its application in a mediterranean area.

    Science.gov (United States)

    Cornejo, E; Fungairiño, S G; Barandica, J M; Serrano, J M; Zorrilla, J M; Gómez, T; Zapata, F J; Acosta, F J

    2016-01-15

    Improving the efficiency of management in protected areas is imperative in a generalized context of limited conservation budgets. However, this is overlooked due to flaws in problem definition, general disregard for cost information, and a lack of suitable tools for measuring costs and management quality. This study describes an innovative methodological framework, implemented in the web application SIGEIN, focused on maximizing the quality of management against its costs, establishing an explicit justification for any decision. The tool integrates, with this aim, a procedure for prioritizing management objects according to a conservation value, modified by a functional criterion; a project management module; and a module for management of continuous assessment. This appraisal associates the relevance of the conservation targets, the efficacy of the methods employed, both resource and personnel investments, and the resulting costs. Preliminary results of a prototypical SIGEIN application on the Site of Community Importance Chafarinas Islands are included.

  13. Integrated project management plan for the Plutonium Finishing Plant stabilization and deactivation project

    International Nuclear Information System (INIS)

    This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex

  14. Patterns and variability of projected bioclimatic habitat for Pinus albicaulis in the Greater Yellowstone Area.

    Directory of Open Access Journals (Sweden)

    Tony Chang

    Full Text Available Projected climate change at a regional level is expected to shift vegetation habitat distributions over the next century. For the sub-alpine species whitebark pine (Pinus albicaulis, warming temperatures may indirectly result in loss of suitable bioclimatic habitat, reducing its distribution within its historic range. This research focuses on understanding the patterns of spatiotemporal variability for future projected P.albicaulis suitable habitat in the Greater Yellowstone Area (GYA through a bioclimatic envelope approach. Since intermodel variability from General Circulation Models (GCMs lead to differing predictions regarding the magnitude and direction of modeled suitable habitat area, nine bias-corrected statistically down-scaled GCMs were utilized to understand the uncertainty associated with modeled projections. P.albicaulis was modeled using a Random Forests algorithm for the 1980-2010 climate period and showed strong presence/absence separations by summer maximum temperatures and springtime snowpack. Patterns of projected habitat change by the end of the century suggested a constant decrease in suitable climate area from the 2010 baseline for both Representative Concentration Pathways (RCPs 8.5 and 4.5 climate forcing scenarios. Percent suitable climate area estimates ranged from 2-29% and 0.04-10% by 2099 for RCP 8.5 and 4.5 respectively. Habitat projections between GCMs displayed a decrease of variability over the 2010-2099 time period related to consistent warming above the 1910-2010 temperature normal after 2070 for all GCMs. A decreasing pattern of projected P.albicaulis suitable habitat area change was consistent across GCMs, despite strong differences in magnitude. Future ecological research in species distribution modeling should consider a full suite of GCM projections in the analysis to reduce extreme range contractions/expansions predictions. The results suggest that restoration strageties such as planting of seedlings and

  15. System and method for interfacing large-area electronics with integrated circuit devices

    Energy Technology Data Exchange (ETDEWEB)

    Verma, Naveen; Glisic, Branko; Sturm, James; Wagner, Sigurd

    2016-07-12

    A system and method for interfacing large-area electronics with integrated circuit devices is provided. The system may be implemented in an electronic device including a large area electronic (LAE) device disposed on a substrate. An integrated circuit IC is disposed on the substrate. A non-contact interface is disposed on the substrate and coupled between the LAE device and the IC. The non-contact interface is configured to provide at least one of a data acquisition path or control path between the LAE device and the IC.

  16. Integrating Economic Models with Biophysical Models in the Willamette Water 2100 Project

    Science.gov (United States)

    Jaeger, W. K.; Plantinga, A.

    2013-12-01

    This paper highlights the human system modeling components for Willamette Water 2100, a comprehensive, highly integrated study of hydrological, ecological, and human factors affecting water scarcity in the Willamette River Basin (WRB). The project is developing a spatiotemporal simulation model to predict future trajectories of water scarcity, and to evaluate mitigation policies. Economic models of land use and water use are the main human system models in WW2100. Water scarcity depends on both supply and demand for water, and varies greatly across time and space (Jaeger et al., 2013). Thus, the locations of human water use can have enormous influence on where and when water is used, and hence where water scarcity may arise. Modeling the locations of human uses of water (e.g., urban versus agricultural) as well as human values and choices, are the principal quantitative ways that social science can contribute to research of this kind. Our models are empirically-based models of human resource allocation. Each model reflects private behavior (choices by households, farms, firms), institutions (property rights, laws, markets, regulations), public infrastructure (dams, canals, highways), and also 'external drivers' that influence the local economy (migration, population growth, national markets and policies). This paper describes the main model components, emphasizing similarities between human and biophysical components of the overall project, and the model's linkages and feedbacks relevant to our predictions of changes in water scarcity between now and 2100. Results presented include new insights from individual model components as well as available results from the integrated system model. Issues include water scarcity and water quality (temperature) for out-of-stream and instream uses, the impact of urban expansion on water use and potential flood damage. Changes in timing and variability of spring discharge with climate change, as well as changes in human uses of

  17. An integrated management tool for rockfall evaluation along transportation corridors: the ParaChute research project

    Science.gov (United States)

    Cloutier, Catherine; Locat, Jacques; Mayers, Mélanie; Noël, François; Turmel, Dominique; Jacob, Chantal; Dorval, Pierre; Bossé, François; Gionet, Pierre; Jaboyedoff, Michel

    2016-04-01

    Rockfall is a significant hazard along linear infrastructures due to the presence of natural and man-made rock slopes. Knowing where the problematic rockfalls source areas are is of primary importance to properly manage and mitigate the risk associated to rockfall along linear infrastructures. The aim of the ParaChute research project is to integrate various technologies into a workflow for rockfall characterization for such infrastructures, using a 220 km-long railroad as the study site which is located on Québec's North Shore, Canada. The objectives of this 3-year project which started in 2014 are: (1) to optimize the use of terrestrial, mobile and airborne laser scanners data into terrain analysis, structural geology analysis and rockfall susceptibility rating, (2) to further develop the use of unmanned aerial vehicles (UAV) for photogrammetry applied to rock cliff characterization, and (3) to integrate rockfall simulation studies into a rock slope classification system similar to the Rockfall Hazard Rating System. Firstly, based on laser scanner data and aerial photographs, the morpho-structural features of the terrain (genetic material, landform, drainage, etc.) are mapped. The result can be used to assess all types of mass movements. Secondly, to guide field work and decrease uncertainty of various parameters, systematic rockfall simulations and a first structural analysis are made from point clouds acquired by mobile and airborne laser scanner. The simulation results are used to recognize the rock slopes that have potentially problematic rockfall paths, meaning they could reach the linear infrastructure. Other rock slopes are not included in the inventory. Field work is carried out to validate and complete the rock slopes characterization previously made from remote sensing technique. Because some or parts of cliffs are not visible or accessible from the railroad, we are currently developing the use of photogrammetry by UAV in order to complete the

  18. The integration of the risk in the governance of urban projects: a key issue for a resilient city

    Science.gov (United States)

    Moulin, E.; Deroubaix, J.-F.

    2012-04-01

    Despite a severe regulation concerning the building in flooding areas, 80% of these areas are already built in the Greater Paris (Paris, Val-de-Marne, Hauts-de-Seine and Seine-Saint-Denis). The land use in flooding area is presented as one of the main solutions to solve the ongoing real estate pressure. For instance some of the industrial wastelands located along the river are currently in redevelopment and residential buildings are planned. So landuse in the flooding areas is currently a key issue in the development of the Greater Paris area. Tools and measures, structural or non-structural such as warning systems, barriers, etc do exist and could be a smart way to improve the resilience of the new urbanised areas. The technical solutions are available and efficient, but we notice that these tools are not much implemented. There is a lack of flood risk concern among the stakeholders and the inhabitants1. How landuse stakeholders could integrate the flood risk in the decision making process throughout the implementation of the urban project? Which type of governance favours an efficient development of good flood risk policy including prevention, protection and the management of the crisis? What is the "good" governance of the urban project e.g. enabling to take into account or not to forget the flood risk and to empower the (future) inhabitants? This inhabitants' empowerment includes the improvement of awareness (i.e. inhabitants being aware that they live in a flooded area) and the improvement of concern (i.e. inhabitants adopting the "right" behaviour when the risk occurs). In order to investigate how flood risk is or could be integrated in the project governance, we interviewed stakeholders (elected representatives, architects, property developers, etc.) and observed the integration or the vanishing of the risk throughout the project. In order to develop this topic we rely on a case study. The "Ardoines" is a project aiming at redeveloping an industrial site

  19. Preprocessing and Screen-Cursor Mapping for a Virtual TouchScreen on a Projected Area

    OpenAIRE

    Smita Das,; Dwijen Rudrapal,; Anupam Jamatia,; Lalita Kumari

    2011-01-01

    Virtual Touch Screen, on a projected area, is a system in which the projection on any ordinary flat surface provides us a graphical work-field for controlling specific kind of operations without anysophisticated touch sensors. Moreover, an ordinary screen area can be transformed into virtual touch screen with the use of a webcam and a projector. The webcam can take the picture of an indicator whichmay be a human finger with LEDs on its tip and then the touch screen is simulated by locating th...

  20. Low cost 3D-printing used in an undergraduate project: an integrating sphere for measurement of photoluminescence quantum yield

    Science.gov (United States)

    Tomes, John J.; Finlayson, Chris E.

    2016-09-01

    We report upon the exploitation of the latest 3D printing technologies to provide low-cost instrumentation solutions, for use in an undergraduate level final-year project. The project addresses prescient research issues in optoelectronics, which would otherwise be inaccessible to such undergraduate student projects. The experimental use of an integrating sphere in conjunction with a desktop spectrometer presents opportunities to use easily handled, low cost materials as a means to illustrate many areas of physics such as spectroscopy, lasers, optics, simple circuits, black body radiation and data gathering. Presented here is a 3rd year undergraduate physics project which developed a low cost (£25) method to manufacture an experimentally accurate integrating sphere by 3D printing. Details are given of both a homemade internal reflectance coating formulated from readily available materials, and a robust instrument calibration method using a tungsten bulb. The instrument is demonstrated to give accurate and reproducible experimental measurements of luminescence quantum yield of various semiconducting fluorophores, in excellent agreement with literature values.

  1. Integrating ergonomic aspects into research and development projects as a preventive strategy in the food industries

    DEFF Research Database (Denmark)

    Hansen, Iben Posniak; Broberg, Ole

    1997-01-01

    As part of a national research and development programme for food technology it was formulated as a demand to applicants to describe the potential ergonomics impact of the research and development (R&D) projects. As the primary purpose of the research programme was to strengthen the Danish food...... are the potentials and limitations for integrating ergonomics into joint R&D projects involving companies within the food industry and the university research? The objectives were (i) to identify the R&D peoples viewpoints on potentials and limitations for integrating ergonomics into R&D projects and (ii) to study...... the R&D processes in such networks in order to obtain a better understanding of the conditions for integrating ergonomics....

  2. 贫困山区小型民族村寨有机农业与旅游融合发展的实践样本*--贵州黎平县滚正村乡居项目的一种解读%Practical Example of Integrated Development of Organic Farming and Tourism in Small Minority Villages of Poor Mountainous Areas:A Case Study of Home-stay Project in Gunzheng Village of Liping County,Guizhou

    Institute of Scientific and Technical Information of China (English)

    吴亚平; 王璟怡

    2016-01-01

    借鉴国内外农业与旅游融合发展研究的理论基础和方法,以贵州黎平县滚正村乡居项目为样本,探索总结贫困山区小型民族村寨有机农业与旅游融合发展应该秉持的理念,分析山地有机农业与民宿旅游业融合发展的方向、条件、路径,并通过解读样本的实践示范价值,指出贫困山区小型民族村寨有机农业与旅游融合发展的未来趋势。%With reference to domestic and international theories and methods of the research on the integrated development of farming and tourism,with the home -stay project in Gunzheng Village of Liping County as a case this paper explores the notions concerned, analyzes the direction,conditions and approaches in the process of implementation, and points out the future trend of the practice in small minority villages of poor moun-tainous areas.

  3. Project B-589, 300 Area transuranic waste interim storage project engineering study

    International Nuclear Information System (INIS)

    The purpose of the study was to look at various alternatives of taking newly generated, remote-handled transuranic waste (caisson waste) in the 300 Area, performing necessary transloading operations and preparing the waste for storage. The prepared waste would then be retrieved when the Waste Isolation Pilot Plant becomes operational and transshipped to the repository in New Mexico with a minimum of inspection and packaging. The scope of this study consisted of evaluating options for the transloading of the TRU wastes for shipment to a 200 Area storage site. Preconceptual design information furnished as part of the engineering study is listed below: produce a design for a clean, sealed waste canister; hot cell loadout system for the waste; in-cell loading or handling equipment; determine transshipment cask options; determine assay system requirements (optional); design or specify transport equipment required; provide a SARP cost estimate; determine operator training requirements; determine waste compaction equipment needs if desirable; develop a cost estimate and approximate schedule for a workable system option; and update the results presented in WHC Document TC-2025

  4. LIE GROUP INTEGRATION FOR CONSTRAINED GENERALIZED HAMILTONIAN SYSTEM WITH DISSIPATION BY PROJECTION METHOD

    Institute of Scientific and Technical Information of China (English)

    张素英; 邓子辰

    2004-01-01

    For the constrained generalized Hamiltonian system with dissipation, by introducing Lagrange multiplier and using projection technique, the Lie group integration method was presented, which can preserve the inherent structure of dynamic system and the constraint-invariant. Firstly, the constrained generalized Hamiltonian system with dissipative was converted to the non-constraint generalized Hamiltonian system, then Lie group integration algorithm for the non-constraint generalized Hamiltonian system was discussed, finally the projection method for generalized Hamiltonian system with constraint was given. It is found that the constraint invariant is ensured by projection technique, and after introducing Lagrange multiplier the Lie group character of the dynamic system can't be destroyed while projecting to the constraint manifold. The discussion is restricted to the case of holonomic constraint. A presented numerical example shows the effectiveness of the method.

  5. Demonstrating artificial intelligence for space systems - Integration and project management issues

    Science.gov (United States)

    Hack, Edmund C.; Difilippo, Denise M.

    1990-01-01

    As part of its Systems Autonomy Demonstration Project (SADP), NASA has recently demonstrated the Thermal Expert System (TEXSYS). Advanced real-time expert system and human interface technology was successfully developed and integrated with conventional controllers of prototype space hardware to provide intelligent fault detection, isolation, and recovery capability. Many specialized skills were required, and responsibility for the various phases of the project therefore spanned multiple NASA centers, internal departments and contractor organizations. The test environment required communication among many types of hardware and software as well as between many people. The integration, testing, and configuration management tools and methodologies which were applied to the TEXSYS project to assure its safe and successful completion are detailed. The project demonstrated that artificial intelligence technology, including model-based reasoning, is capable of the monitoring and control of a large, complex system in real time.

  6. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  7. The DOE Wide Area Measurement System (WAMS) Project: Demonstration of dynamic information technology for the future power system

    Energy Technology Data Exchange (ETDEWEB)

    Mittelstadt, W.A. [USDOE Bonneville Power Administration, Portland, OR (United States); Krause, P.E.; Wilson, R.E. [USDOE Western Area Power Administration, Golden, CO (United States); Overholt, P.N. [USDOE, Washington, DC (United States); Sobajic, D.J. [Electric Power Research Inst., Palo Alto, CA (United States); Hauer, J.F. [Pacific Northwest National Lab., Richland, WA (United States); Rizy, D.T. [Oak Ridge National Lab., TN (United States)

    1996-07-01

    In 1989 the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) joined the US Department of Energy (DOE) in an assessment of longer-term research and development needs for future electric power system operation. The effort produced a progressively sharper vision of a future power system in which enhanced control and operation are the primary means for serving new customer demands, in an environment where increased competition, a wider range of services and vendors, and much narrower operating margins all contribute to increased system efficiencies and capacity. Technology and infrastructure for real time access to wide area dynamic information were identified as critical path elements in realizing that vision. In 1995 the DOE accordingly launched the Wide Area Measurement System (WAMS) Project jointly with the two Power Marketing Administrations (PMAs) to address these issues in a practical operating environment--the western North America power system. The Project draws upon many years of PMA effort and related collaboration among the western utilities, plus an expanding infrastructure that includes regionally involved contractors, universities, and National Laboratories plus linkages to the Electric Power Research Institute (EPRI). The WAMS project also brings added focus and resources to the evolving Western System Dynamic Information Network, or WesDINet. This is a collective response of the Western Systems Coordinating Council (WSCC) member utilities to their shared needs for direct information about power system characteristics, model fidelity, and operational performance. The WAMS project is a key source of the technology and backbone communications needed to make WesDINet a well integrated, cost effective enterprise network demonstrating the role of dynamic information technology in the emerging utility environment.

  8. A Data Model for Integrating Heterogeneous Medical Data in the Health-e-Child Project

    CERN Document Server

    Branson, Andrew; McClatchey, Richard; Rogulin, Dmitry; Shamdasani, Jetendr

    2008-01-01

    There has been much research activity in recent times about providing the data infrastructures needed for the provision of personalised healthcare. In particular the requirement of integrating multiple, potentially distributed, heterogeneous data sources in the medical domain for the use of clinicians has set challenging goals for the healthgrid community. The approach advocated in this paper surrounds the provision of an Integrated Data Model plus links to/from ontologies to homogenize biomedical (from genomic, through cellular, disease, patient and population-related) data in the context of the EC Framework 6 Health-e-Child project. Clinical requirements are identified, the design approach in constructing the model is detailed and the integrated model described in the context of examples taken from that project. Pointers are given to future work relating the model to medical ontologies and challenges to the use of fully integrated models and ontologies are identified.

  9. High Order Projection Plane Method for Evaluation of Supersingular Curved Boundary Integrals in BEM

    OpenAIRE

    Miao Cui; Wei-zhe Feng; Xiao-wei Gao; Kai Yang

    2016-01-01

    Boundary element method (BEM) is a very promising approach for solving various engineering problems, in which accurate evaluation of boundary integrals is required. In the present work, the direct method for evaluating singular curved boundary integrals is developed by considering the third-order derivatives in the projection plane method when expanding the geometry quantities at the field point as Taylor series. New analytical formulas are derived for geometry quantities defined on the curve...

  10. New Strategy and Innovative Projects at the National Biosurveillance Integration Center

    OpenAIRE

    Bennett, Steven; Quitugua, Teresa

    2013-01-01

    Objective Enhance knowledge of the vision, mission, strategic goals, and objectives of the National Biosurveillance Integration Center (NBIC). Learn about innovative biosurveillance projects ongoing in NBIC. Introduction For a number of years, the federal government has provided biosurveillance in various domains within different departments and agencies. Congress recognized the need for a means of integrating these separate information sources into a more useable resource by chartering NBIC ...

  11. The integral cohomology groups of configuration spaces of pairs of points in real projective spaces

    CERN Document Server

    Gonzalez, Jesus

    2010-01-01

    We compute the integral homology and cohomology groups of configuration spaces of two distinct points on a given real projective space. The explicit answer is related to the (known multiplicative structure in the) integral cohomology---with simple and twisted coefficients---of the dihedral group of order 8 (in the case of unordered configurations) and the elementary abelian 2-group of rank 2 (in the case of ordered configurations).

  12. Analysis on the integration in the educational system of the ICT: institutional projects and permanent training

    OpenAIRE

    Javier Rodríguez Torres

    2012-01-01

    Throughout this work we wanted to analyze some of the speeches that are implicit or explicit in teacher training on curriculum integration of ICT. This task responds to the discovery of the interests and values that guide rational action and the principles that serve as a framework to develop proposals with ICT and its impact on the professional development of teachers in a school.  We approach the realization of institutional projects for integration into the educational system of ICT and it...

  13. THE "CARTA DELLA NATURA" MAPPING PROJECT IN THE SUPRAMONTE AREA (CENTRAL-EAST SARDINIA

    Directory of Open Access Journals (Sweden)

    G. BRUNDU

    2008-01-01

    Full Text Available Since 1991, the Italian framework law on protected areas, has been calling for the editing of a national Nature Map, an instrument for the assessment of the state of the environment in Italy. The methodology applied in Sardinia is comparable with those applied in the other regions of Italy, with the necessary modifications, generalizations and integrations. Satellite imagery represents the fundamental informative layer to provide a synoptic view of the whole territory. In a second proceeding step, supervised classification is thematically enhanced by using logical niche models of species and habitats derived from assessed relationships between species-habitats known distributions patterns and available predictors, i.e. GIS thematic layers. This has resulted in the production of a habitat map with 24 habitat and land use classes. The environmental assessment procedure delivered four maps, the ecological value, the environmental sensitivity, the anthropic pressure and the land vulnerability (fragility. A reduction from 70 to 24 habitat/land use types, is coherent with the aims of the projects and planned deliverables. These 24 classes have been detected with semi-automatic procedures and with a high level of reliability. It is a reasonable compromise between thematic resolution and the possibility to record a synoptic view of the whole land in an acceptable lap of time. Various stakeholders will benefit from knowing the current condition of habitats distribution. Described deliverables are powerful tools for monitoring at regional level future land-use and habitat changes on a solid quantitative basis, for environmental conservation and habitat management.

  14. Public relations and political support in area-wide integrated pest management programmes that integrate the sterile insect technique

    International Nuclear Information System (INIS)

    The public relations component of area-wide integrated pest management (AW-IPM) programmes that integrate the sterile insect technique (SIT) has a large impact on programme success. Full-time professionals should direct public relations activities and secure vital political support from governments and community organizations. Good communication among programme staff, and between programme staff and the public, is required to maintain participation and support, and to keep the work goal-oriented even when some programme activities are controversial. The media can be valuable and effective partners by informing the public about the real facts and activities of a programme, especially if this is done in a non-technical and straightforward way. Ongoing research support improves the programme technology, provides technical credibility on contentious issues, and solves operational problems. Programme failure can result from poor public relations and inadequate public support. (author)

  15. Soil Contamination, Advanced integrated characterisation and time-lapse Monitoring, SoilCAM project highlights

    Science.gov (United States)

    French, H. K.; Van Der Zee, S. E.; Wehrer, M.; Godio, A.; Pedersen, L. B.; Tsocano, G.

    2013-12-01

    measurements indicate where the remaining crude oil can be found. Water samples from multilevel samplers reveal crude oil present in emulsion in the zone of groundwater fluctuations, highlighting the importance of colloidal transport. Modelling of multiphase flow of the fluctuating groundwater level explains the lack of horizontal displacement of the plume in the area. Geochemistry of the groundwater clearly indicates degradation of hydrocarbons under iron- and sulphate reducing conditions, but changes were too slow to be mapped by time-lapse geophysical measurements during the project period. MODFLOW was used to simulate the regional groundwater flow and transport in the area. Highlights of the results from both test sites will be presented as an integrated overview. Snow removal at Oslo airport

  16. Hydrologic Resources Management Program and Underground Test Area Project FY 2006 Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Culham, H W; Eaton, G F; Genetti, V; Hu, Q; Kersting, A B; Lindvall, R E; Moran, J E; Blasiyh Nuno, G A; Powell, B A; Rose, T P; Singleton, M J; Williams, R W; Zavarin, M; Zhao, P

    2008-04-08

    This report describes FY 2006 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains four chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and National Security Technologies (NSTec). Chapter 1 is a summary of FY 2006 sampling efforts at near-field 'hot' wells at the NTS, and presents new chemical and isotopic data for groundwater samples from four near-field wells. These include PM-2 and U-20n PS 1DDh (CHESHIRE), UE-7ns (BOURBON), and U-19v PS No.1ds (ALMENDRO). Chapter 2 is a summary of the results of chemical and isotopic measurements of groundwater samples from three UGTA environmental monitoring wells. These wells are: ER-12-4 and U12S located in Area 12 on Rainier

  17. Project management technology transfer for the Qinshan CANDU project: an integrated team approach

    International Nuclear Information System (INIS)

    This paper describes how technology for project management is being transferred from Atomic Energy of Canada Limited to Third Qinshan Nuclear Power Company Ltd. It includes a description of the Contract model and participants, software used, specific activities planned and progress to date in initiating the transfer of know-how to the Qinshan Site in China

  18. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    Science.gov (United States)

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  19. An Integrated Online Library System as a Node in a Local Area Network: The Mitre Experience.

    Science.gov (United States)

    Kidwell, Mary Coyle

    1987-01-01

    Discusses the Mitre Corporation's implementation of OCLC's LS/2000 integrated library system using a local area network (LAN). LAN issues--requirements, equipment, reliability, growth, security, and traffic--are covered in general and as they relate to Mitre. Installation of the LAN/system interface and benefits and drawbacks of using a LAN for…

  20. Territories of Integration: The Children of Immigrants in the Schools of the Metropolitan Area of Lisbon

    Science.gov (United States)

    Hortas, Maria Joao

    2008-01-01

    This article presents the responses given in several schools of the 1st Cycle of the Basic Education Level (children aged 6 to 10 years) of the Metropolitan Area of Lisbon relating to the issue of integration of immigrant children and children of immigrant descent. The goal was to establish the relationship between the geographical context where…

  1. INTEGRATING GEOSPATIAL TECHNOLOGIES AND SECONDARY STUDENT PROJECTS: THE GEOSPATIAL SEMESTER

    Directory of Open Access Journals (Sweden)

    Bob Kolvoord

    2012-12-01

    Full Text Available Resumen:El Semestre Geoespacial es una actividad de educación geográfica centrada en que los estudiantes del último curso de secundaria en los institutos norteamericanos, adquieran competencias y habilidades específicas en sistemas de información geográfica, GPS y teledetección. A través de una metodología de aprendizaje basado en proyectos, los alumnos se motivan e implican en la realización de trabajos de investigación en los que analizan, e incluso proponen soluciones, diferentes procesos, problemas o cuestiones de naturaleza espacial. El proyecto está coordinado por la Universidad James Madison y lleva siete años implantándose en diferentes institutos del Estado de Virginia, implicando a más de 20 centros educativos y 1.500 alumnos. Los alumnos que superan esta asignatura de la enseñanza secundaria obtienen la convalidación de determinados créditos académicos de la Universidad de referencia.Palabras clave:Sistemas de información geográfica, enseñanza, didáctica de la geografía, semestre geoespacial.Abstract:The Geospatial Semester is a geographical education activity focused on students in their final year of secondary schools in the U.S., acquiring specific skills in GIS, GPS and remote sensing. Through a methodology for project-based learning, students are motivated and involved in conducting research using geographic information systems and analyze, and even propose solutions, different processes, problems or issues spatial in nature. The Geospatial Semester university management not only ensures proper coaching, guidance and GIS training for teachers of colleges, but has established a system whereby students who pass this course of secondary education gain the recognition of certain credits from the University.Key words:Geographic information system, teaching, geographic education, geospatial semester. Résumé:Le semestre géospatial est une activité axée sur l'éducation géographique des étudiants en derni

  2. Ways of Increasing Property Values in Degraded Urban Areas: Projects Implemented in Pécs, Hungary

    Directory of Open Access Journals (Sweden)

    Éva Szabó

    2013-08-01

    Full Text Available Property prices are extremely low in extensive degraded urban areas. Enhancing property values in these areas is a foremost concern for both property owners and for the town as a whole. The aim is to transform isolated, disadvantaged urban areas; to increase property prices so that they reach the level of average property prices in the town, thus giving way to the development and revitalization of these deprived neighborhoods. The paper will describe the urban areas in question (housing estates, industrial areas, underused urban areas and the methods used by the local government. They include strategically located important public buildings, renewing public spaces and parks, regenerating derelict industrial sites. Most of these projects have been implemented within the Pécs 2010 European Capital of Culture programs.

  3. Nevada Test Site Area 25. Radiological survey and cleanup project, 1974-1983. Final report

    International Nuclear Information System (INIS)

    This report describes radiological survey, decontamination and decommissioning of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The cleanup was part of the Surplus Facilities Management Program funded by the Department of Energy's Richland Operations Office. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for alpha and beta plus gamma radiation contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 12 figures

  4. Coupling interaction between biodiversity and aquatic habitat area in Western Route Project vicinity

    Institute of Scientific and Technical Information of China (English)

    Shi-min TIAN; Zhao-yin WANG; Xiang-jun LIU; Shi-kui LIANG

    2010-01-01

    The Western Route of the South-to-North Water Transfer Project will divert water from the upper Yangtze River and its tributaries,the Dadu River and Yalong River,to the upper Yellow River.The project may ease the water shortage in the Yellow River Basin.However,it may also have some effects on the ecosystem in the upper Yangtze River Basin.Benthic invertebrates play an important role in the river ecosystem,particularly in the circulation of materials and nutrition.Benthic invertebrates are widely used to quickly assess river ecosystems because of their rapid response to changes in the water environment.The diversity of benthic invertebrates is closely associated with the aquatic habitat area.This study examined this interaction by sampling the benthic invertebrates in an expanding area.The conclusions are that the diversity of benthic invertebrates begins to decrease when the aquatic habitat area is reduced to 45% of the original area,and decreases dramatically when the aquatic habitat area is reduced to 10% of the original area.The aquatic habitat area should be kept at more than 45% of the original area in order to maintain the significant diversity of benthic invertebrates.

  5. Computer Technology-Integrated Projects Should Not Supplant Craft Projects in Science Education

    Science.gov (United States)

    Klopp, Tabatha J.; Rule, Audrey C.; Schneider, Jean Suchsland; Boody, Robert M.

    2014-01-01

    The current emphasis on computer technology integration and narrowing of the curriculum has displaced arts and crafts. However, the hands-on, concrete nature of craft work in science modeling enables students to understand difficult concepts and to be engaged and motivated while learning spatial, logical, and sequential thinking skills. Analogy…

  6. IEC activities in Mexfam's programs: an application of the integrated project's philosophy.

    Science.gov (United States)

    Lopez Juarez, A; Rodriguez R, G

    1986-11-01

    An organized effort to promote family planning in Mexico began in 1965. The Mexican Foundation for Family Planning (MEXFAM), was pioneering organization in this social effort. Since 1974, the Mexican Government has taken an active role in family planning and promoting its practive through the mass media. Success has been achieved because of the existing cultural and socioeconomic conditions which made birth control acceptable. Today, over 50% of Mexican women of reproductive age practice family planning. Those who do not practice family planning have adverse or indifferent attitudes toward it. The MEXFAM has successfully developed an integrated project which associates family planning with the control of parasite infection, nutrition and maternal and child care through community health education. MEXFAM emphasizes the importance of education. The IEC activities are based on the concept that communication among human beings is a dynamic process. Messages are developed in light of the changes which are likely to be produced in the consciences of different social groups. 3 basic types of messages will be formed: those dealing with the integrated concept of family planning; those dealing with the desired child; and those dealing with the life plan. MEXFAM directs its IEC activities towards the following groups: community leaders and leaders of other situations; professionals and technicians in family planning; poor families in both urban and rural areas; urban youth; and men. The MEXFAM uses intergroup educational media and local mass media. Family planning today tries to illustrate, motivate, and raise the consciousness of people and achieve humanist ideals of well-being. PMID:12314460

  7. PIXE analysis of tree leaves as a possible comparative integral monitor of particulates in urban areas

    International Nuclear Information System (INIS)

    The possibility of obtaing integral comparative data for particulate distribution in urban areas from PIXE analysis of tree leaves is discussed in relation to the leaf gross anatomy, to the diffusion of selected tree species in such areas and to the implementation of experimental techniques necessary to make PIXE analysis effective. Multielemental scans were performed on a small set samples; results are compared to PIXE analysis of typical urban aerosols. The validity of the method and the criteria for yearly relative comparisons of different areas are discissed

  8. Forest conservation and the clean development mechanism. Lessons from the Costa Rican protected areas project

    International Nuclear Information System (INIS)

    Deforestation is currently the source of about 20% of anthropogenic CO2 emissions. Avoided deforestation has, nonetheless, been ruled out as a Clean Development Mechanism (CDM) category in the Kyoto Protocol's first commitment period, because several methodological issues were considered too difficult to resolve. This paper explores whether CDM issues such as (1) carbon quantification, (2) additionality and baseline setting, (3) leakage risks, (4) non-permanence risks, and (5) sustainable development can be adequately dealt with in large, diversified forest conservation projects. To this aim, it studies the case of the Costa Rican Protected Areas Project (PAP), an Activities Implemented Jointly (AIJ) project which was meant to consolidate the national park system to avoid deforestation, promote the growth of secondary forests and regenerate pastures on an area that, in total, covers 10% of the national territory. The case study examines how the issues mentioned above have been addressed in the project design and in the certification process. It is found that baseline uncertainties are the major problem in this case. Nonetheless, the case suggests the possibility to address CDM issues by specific requirements for project design and very conservative and temporary crediting. Provided that other case studies support this conclusion, eligibility of well-designed forest conservation projects under the CDM in the second commitment period may be worth considering, given the secondary benefits of avoided deforestation

  9. D-Area Drip Irrigation/Phytoremediation Project: SRTC Report on Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Wilde, E.W.

    2001-09-11

    The overall objective of this project is to evaluate a novel drip irrigation-phytoremediation process for remediating volatile organic contaminants (VOCs), primarily trichloroethylene (TCE), from groundwater in D-Area at the Savannah River Site (SRS). The process is expected to be less expensive and more beneficial to the environment than alternative TCE remediation technologies.

  10. WACOP (Westside Area Career/Occupation Project) Media Catalog for 1973, 1974.

    Science.gov (United States)

    Glur, John; Catalano, Ruth

    The catalog lists various commercially prepared media materials available on loan from the Westside Area Career Occupation Project (WACOP) Media Center for evaluation prior to school or district purchase. Among the types of media specified are: books, kits, cassettes, films, instructional units, transparencies, posters, pamphlets, and magazines.…

  11. Use of project activity in integrated teaching of the English and Kazakh languages to students of economics faculty

    Directory of Open Access Journals (Sweden)

    Gulnara Moldakhmetova

    2009-10-01

    Full Text Available In the work we gave the definition of the project activity and considered the use of the project activity in the integrated teaching of the English and Kazakh languages to students of the faculty of economics.

  12. Integrated learning of mathematics, science and technology concepts through LEGO/Logo projects

    Science.gov (United States)

    Wu, Lina

    This dissertation examined integrated learning in the domains of mathematics, science and technology based on Piaget's constructivism, Papert's constructionism, and project-based approach to education. Ten fifth grade students were involved in a two-month long after school program where they designed and built their own computer-controlled LEGO/Logo projects that required the use of gears, ratios and motion concepts. The design of this study centered on three notions of integrated learning: (1) integration in terms of what educational materials/settings provide, (2) integration in terms of students' use of those materials, and (3) integration in the psychological sense. In terms of the first notion, the results generally showed that the LEGO/Logo environment supported the integrated learning of math, science and technology concepts. Regarding the second notion, the students all completed impressive projects of their own design. They successfully combined gears, motors, and LEGO parts together to create motion and writing control commands to manipulate the motion. But contrary to my initial expectations, their successful designs did not require numerical reasoning about ratios in designing effective gear systems. When they did reason about gear relationships, they worked with "qualitative" ratios, e.g., "a larger driver gear with a smaller driven gear increases the speed." In terms of the third notion of integrated learning, there was evidence in all four case study students of the psychological processes involved in linking mathematical, scientific, and/or technological concepts together to achieve new conceptual units. The students not only made connections between ideas and experiences, but also recognized decisive patterns and relationships in their project work. The students with stronger overall project performances showed more evidence of synthesis than the students with relatively weaker performances did. The findings support the conclusion that all three

  13. 1. annual workshop proceedings of integrated project fundamental processes of radionuclide migration IP Funmig

    International Nuclear Information System (INIS)

    These are the proceedings of the 1. Annual Workshop Proceedings of the Integrated Project FUNMIG (fundamental processes of radionuclide migration). The Annual Workshop was hosted by CEA and held in Saclay, 28 November - 1 December 2005. The project started January 2005 and has a duration of four years. The project makes use of annual workshops bringing the project partners together and inviting external groups to participate and contribute. Consequently, the present proceedings will be followed by another three proceedings from the forthcoming annual workshops to be held the end of 2006, 2007 and 2008. The 2. Annual Workshop will be hosted by SKB and be held in Stockholm, 21-23 November 2006. The proceedings serve several purposes. The key purpose is to document and make available to a broad scientific community the outcome of this project. A considerable part of the project activity reporting is also done through the proceedings. For this reason the first parts of the proceedings are structured around the workshop and the project. A large part of the proceedings, however, also contain individual scientific contributions by the project partners as well as external contributors. Information about the project can be found under www.funmig.com. (authors)

  14. Integration of surface and groundwater resources for the development of Hamad Basin project

    Science.gov (United States)

    Rofail, Nabil; Asaad, S. I.

    1989-11-01

    Hamad Basin (166,000 km2) is an extensive basin, inhabited by 219,000 souls. It is located in the arid region within the border of four Arab States: Syria, Jordan, Iraq, and Saudi Arabia. Average annual precipitation depth is 78 mm, falling mostly during winter. Integrated studies of the natural resources, (water, soil, range, and animal) were carried out with other complementary studies to formulate a socioeconomic development plan for the promissing areas within the basin. Modern technologies were applied such as remote sensing, isotope analysis, processing, and documenting of basic hydrogeological data within the data bank system using computer facilities. Results revealed that the output of the natural dry plant production amounts to 2.0 × 106 tons. Animal wealth comprise 2 × 106 head mainly of sheep. Average annual surface runoff is 146 × 106 m3, which could be appropriately exploited in water spreading schemes to improve range. Water lost presently through evaporation from vast flat depression (Khabra) could be conserved through deepening the Khabras, and recharging shallow perched aquifer by surface runoff, which could be mined later. Results of regional geology, partial geophysical studies, and hydrogeological, hydrochemical interpretations have concuded the existance of two main aquifer systems, the first lies within the tertiary and quaternary formations, while the second extends to the mesozoic, and paleozoic. Their yield varies quantitively and qualitively, up to 100 × 106 m3 could be safely drawn annually. One compound pilot project was selected within the sector of each of the four Arab States to test the feasibility of the proposed development program for the promissing areas of the basin.

  15. Learning from the experience: preliminary results of integration experiments within PRE-EARTHQUAKES EU-FP7 Project.

    Science.gov (United States)

    Tramutoli, V.; Inan, S.; Jakowski, N.; Pulinets, S.; Romanov, A.; Filizzola, C.; Shagimuratov, I.; Pergola, N.; Genzano, N.; Lisi, M.; Alparslan, E.; Wilken, V.; Tsybulia, K.; Romanov, A.; Paciello, R.; Balasco, M.; Zakharenkova, I.; Ouzounov, D.; Papadopoulos, G. A.; Parrot, M.

    2012-04-01

    PRE-EARTHQUAKES (Processing Russian and European EARTH observations for earthQUAKE precursors Studies) EU-FP7 project is devoted to demonstrate - integrating different observational data, comparing and improving different data analysis methods - how it is possible to progressively increase reliability of short term seismic risk assessment. Three main testing area were selected (Italy, Turkey and Sakhalin ) in order to concentrate observations and integration efforts starting with a learning phase on selected event in the past devoted to identify the most suitable parameters, observations technologies, data analysis algorithms. To this aim events offering major possibilities (variety) of integration were particularly considered - Abruzzo EQ (April 6th 2009 Mw 6.3) for Italy, Elazig EQ (March 8th 2010 Mw 6.1) for Turkey and Nevelsk EQ (August 2nd 2007 Mw 6.2) for Sakhalin - without excluding other significant events occurred during 2011 like the ones of Tōhoku in Japan and Van in Turkey. For these events, different ground (80 radon and 29 spring water stations in Turkey region, 2 magneto-telluric in Italy) and satellite (18 different systems) based observations, 11 data analysis methods, for 7 measured parameters, have been compared and integrated. Results achieved by applying a validation/confutation approach devoted to evaluate the presence/absence of anomalous space-time transients in single and/or integrated observation time-series will be discussed also in comparison with results independently achieved by other authors.

  16. Supplier integration in product development: A matter of designing the project structure

    Directory of Open Access Journals (Sweden)

    Mike Danilovic

    2007-11-01

    Full Text Available In product development close collaboration between systems integrators and suppliers is important. The purpose of this article is to investigate the impact of the work breakdown structure (WBS and work packages (WPs in product development on the possibility of carrying through the strategy of supplier involvement into collaborative practice and to investigate how supplier involvement can be improved by altering the design of collaborative WBS and WP structures. Dependence Structure Matrix (DSM is introduced in order to analyse, visualise and manage interdependencies, in terms of information exchange between the systems integrator and supplier. This article shows how DSM can support the alternative design of integrated and collaborative WBS and integrated WPs following the logic of dependencies and the flow of information in order to support a strategy focusing on integration of suppliers on project and team level.

  17. Pilot project SPINOZA - branch-integrated metering; Pilotprojekt SPINOZA - spartenintegrierte Zaehlerauslesung

    Energy Technology Data Exchange (ETDEWEB)

    Wenz, Werner [Stadtwerke Karlsruhe Netze GmbH, Karlsruhe (Germany); Ruoff, Erwin [Stadtwerke Karlsruhe GmbH, Karlsruhe (Germany)

    2009-02-15

    Public utilities Karlsruhe GmbH has started in August 2008 the Smart Meter Pilot project SPINOZA (field integrated on-line metering). The aim is to collect experiences for the utilization of advanced technologies, which are required up to 2010 at least for power and gas supply. (orig./GL)

  18. An Integrated Programme from the Students' Perspective: The Bronte Creek Project.

    Science.gov (United States)

    Jupp, Jennifer

    1995-01-01

    Students who participated in the Bronte Creek Project, an integrated outdoor education program in Ontario that involves 11th-grade students in outdoor experiences and leadership opportunities, found the program to be authentic, felt empowered as a result of the program, became more responsible, and reported improved personal relations. (LP)

  19. Enhancing the Interdisciplinary Perspective in the Marketing Management Decision Process through an Applied, Integrated, Client Project

    Science.gov (United States)

    Askim-Lovseth, Mary K.; O'Keefe, Timothy P.

    2012-01-01

    Businesses function within a cross-functional, integrative setting, and this necessitates providing a learning environment for students that is comparable to real-life work projects. Two upper-level university classes in marketing and information systems worked collaboratively with a snack food business to design and build a Web site based on a…

  20. Forked and Integrated Variants In An Open-Source Firmware Project

    DEFF Research Database (Denmark)

    Stanciulescu, Stefan; Schulze, Sandro; Wasowski, Andrzej

    2015-01-01

    Code cloning has been reported both on small (code fragments) and large (entire projects) scale. Cloning-in-the-large, or forking, is gaining ground as a reuse mechanism thanks to availability of better tools for maintaining forked project variants, hereunder distributed version control systems a...... and how feature implementations are migrated from forks to the main integrated platform. We believe that this understanding will ultimately help development of tools mixing clone-based and integrated variant management, combining the advantages of both....... and integrated variability management (conditional ompilation) to create variants and features. Thus studying it increases our understanding of the choice between integrated and clone-based variant management. It also allows us to observe mechanisms governing source code maturation, in particular when, why......Code cloning has been reported both on small (code fragments) and large (entire projects) scale. Cloning-in-the-large, or forking, is gaining ground as a reuse mechanism thanks to availability of better tools for maintaining forked project variants, hereunder distributed version control systems...

  1. National Bioenergy Center, Biochemical Platform Integration Project: Quarterly Update, Summer 2011 (Newsletter)

    Energy Technology Data Exchange (ETDEWEB)

    2011-09-01

    Summer 2011 issue of the National Bioenergy Center Biochemical Platform Integration Project quarterly update. Issue topics: evaluating new analytical techniques for measuring soluble sugars in the liquid portion of biomass hydrolysates, and measurement of the fraction of insoluble solids in biomass slurries.

  2. A Comparative Analysis between Direct and Indirect Measurement of Year I Integrated Project

    Science.gov (United States)

    Abdullah, Siti Rozaimah Sheikh; Mohamad, Abu Bakar; Anuar, Nurina; Markom, Masturah; Ismail, Manal; Rosli, Masli Irwan; Hasan, Hassimi Abu

    2013-01-01

    The Integrated Project (IP) has been practised in the Department of Chemical and Process Engineering (JKKP) since the 2006/2007 session. Initially, the IP is only implemented for the Year II students for both Chemical (KK) and Biochemical Engineering (KB) programmes. Previously, the Year 1 curriculum was only based on the common faculty courses.…

  3. The role of research and researchers in integrative and participatory projects

    NARCIS (Netherlands)

    Tress, G.; Tress, B.; Bloemmen, M.H.I.

    2003-01-01

    The previous chapters reflect on knowledge production and how to move from tacit to explicit knowledge in integrative and particpatory projects in the fields of landscape research and planning. This chapter takes the opportunity to draw some conclusions of a more general nature

  4. Yunnan Metallurgical Group and Zhaotong together Discussed Hydropower Aluminum Integration Project

    Institute of Scientific and Technical Information of China (English)

    2015-01-01

    Recently,CPC Yunnan Province Zhaotong Municipal Committee,Zhaotong Municipal Government and Yunnan Metallurgical Group opened a discussion meeting in Kunming,anddiscussed relevant matters about the construction of Hydropower aluminum industry integration project,aiming to promote mutual benefit and win-win between both sides,and fulfill joint development.Liu Jianhua,

  5. The Integration of Project-Based Methodology into Teaching in Machine Translation

    Science.gov (United States)

    Madkour, Magda

    2016-01-01

    This quantitative-qualitative analytical research aimed at investigating the effect of integrating project-based teaching methodology into teaching machine translation on students' performance. Data was collected from the graduate students in the College of Languages and Translation, at Imam Muhammad Ibn Saud Islamic University, Riyadh, Saudi…

  6. 77 FR 6778 - Nez Perce-Clearwater National Forests; Idaho; Clear Creek Integrated Restoration Project

    Science.gov (United States)

    2012-02-09

    ... timber outputs produced through restoration activities to support the economic structure of local... the Clear Creek Integrated Restoration Project. The Proposed action would use a combination of timber... effectiveness; improve habitat for early seral species; and maintain habitat structure, function, and...

  7. Vertical and Horizontal Integration of Laboratory Curricula and Course Projects across the Electronic Engineering Technology Program

    Science.gov (United States)

    Zhan, Wei; Goulart, Ana; Morgan, Joseph A.; Porter, Jay R.

    2011-01-01

    This paper discusses the details of the curricular development effort with a focus on the vertical and horizontal integration of laboratory curricula and course projects within the Electronic Engineering Technology (EET) program at Texas A&M University. Both software and hardware aspects are addressed. A common set of software tools are…

  8. Case study of the interdisciplinary integration in an IST-E3 project

    DEFF Research Database (Denmark)

    Jørgensen, Ulrik

    2002-01-01

    Case study of a specific IST-E3 project funded by the EU commissions 5th framework program. The case study highlights the difficulties in integrating different disciplinary approaches and suggests that a more openended research strategy should be applied by the commission....

  9. MHD Integrated Topping Cycle Project. Sixteenth quarterly technical progress report, May 1991--July 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The Magnetohydrodynamics (MHD) Integrated Topping Cycle (ITC) Project represents the culmination of the proof-of-concept (POC) development stage in the US Department of Energy (DOE) program to advance MHD technology to early commercial development stage utility power applications. The project is a joint effort, combining the skills of three topping cycle component developers: TRW, Avco/TDS, and Westinghouse. TRW, the prime contractor and system integrator, is responsible for the 50 thermal megawatt (50 MW{sub t}) slagging coal combustion subsystem. Avco/TDS is responsible for the MHD channel subsystem (nozzle, channel, diffuser, and power conditioning circuits), and Westinghouse is responsible for the current consolidation subsystem. The ITC Project will advance the state-of-the-art in MHD power systems with the design, construction, and integrated testing of 50 MW{sub t} power train components which are prototypical of the equipment that will be used in an early commercial scale MHD utility retrofit. Long duration testing of the integrated power train at the Component Development and Integration Facility (CDIF) in Butte, Montana will be performed, so that by the early 1990`s, an engineering data base on the reliability, availability, maintainability and performance of the system will be available to allow scaleup of the prototypical designs to the next development level. This Sixteenth Quarterly Technical Progress Report covers the period May 1, 1991 to July 31, 1991.

  10. Great Lakes O shore Wind Project: Utility and Regional Integration Study

    Energy Technology Data Exchange (ETDEWEB)

    Sajadi, Amirhossein [Case Western Reserve Univ., Cleveland, OH (United States); Loparo, Kenneth A. [Case Western Reserve Univ., Cleveland, OH (United States); D' Aquila, Robert [General Electric (GE), Albany, NY (United States); Clark, Kara [National Renewable Energy Lab. (NREL), Golden, CO (United States); Waligorski, Joseph G. [FirstEnergy, Akron, OH (United States); Baker, Scott [PJM Interconnection, Audubon, PA (United States)

    2016-06-30

    This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods to quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.

  11. A Novel Evaluation Method for Building Construction Project Based on Integrated Information Entropy with Reliability Theory

    Directory of Open Access Journals (Sweden)

    Xiao-ping Bai

    2013-01-01

    Full Text Available Selecting construction schemes of the building engineering project is a complex multiobjective optimization decision process, in which many indexes need to be selected to find the optimum scheme. Aiming at this problem, this paper selects cost, progress, quality, and safety as the four first-order evaluation indexes, uses the quantitative method for the cost index, uses integrated qualitative and quantitative methodologies for progress, quality, and safety indexes, and integrates engineering economics, reliability theories, and information entropy theory to present a new evaluation method for building construction project. Combined with a practical case, this paper also presents detailed computing processes and steps, including selecting all order indexes, establishing the index matrix, computing score values of all order indexes, computing the synthesis score, sorting all selected schemes, and making analysis and decision. Presented method can offer valuable references for risk computing of building construction projects.

  12. Assessment of Flooded Areas Projections and Floods Potential Impacts Applying Remote Sensing Imagery and Demographic Data

    Science.gov (United States)

    Rodriguez, D. A.; Carriello, F.; Fernandes, P. J. F.; Garofolo Lopes, L.; Siqueira Júnior, J. L.

    2016-06-01

    Assessing vulnerability and potential impacts associated with extreme discharges requires an accurate topographic description in order to estimate the extension of flooded areas. However, in most populated regions, topographic data obtained by in-situ measurements is not available. In this case, digital elevation models derived from remote sensing date are usually applied. Moreover, this digital elevation models have intrinsic errors that introduce bigger uncertainty in results than the associated to hydrological projections. On the other hand, estimations of flooded areas through remote sensing images provide accurate information, which could be used for the construction of river level-flooded area relationships regarding vulnerability assessment. In this work, this approach is applied for the city of Porto Velho in the Brazilian Amazonia to assess potential vulnerability to floods associated with climate change projections. The approach is validated using census data, provided by the Brazilian Institute of Geography and Statistics, and information about socio-economical injuries associated to historical floods, provided by the Brazilian Civil Defence. Hydrological projections under climate change are carried out using several downscaling of climate projections as inputs in a hydrological model. Results show more accurate estimation of flood impacts than the obtained using digital elevation models derivate from remote sensing data. This reduces uncertainties in the assessment of vulnerability to floods associated with climate change in the region.

  13. Environmental impacts of Ghazi Barotha hydropower project on river Indus and surrounding areas

    International Nuclear Information System (INIS)

    WAPDA being an esteemed organization of the country is involved in development of Water and Power Sector Projects. Ghazi Barotha Hydropower Project is another huge hydropower generation project in the country after Tarbela. The barrage to feed power channel of Ghazi Barotha Power Station are built over River Indus 7 Km down of Tarbela Dam. The project has been constructed to utilize the hydraulic head for power generation that is available between the tailrace of Tarbela Dam and the confluence of Haro River. In this reach river Indus drops by 76 m in distance of 63 Km. This is solely a power generation project with an installed capacity of 1450 MW. The purpose of this paper is to assess the negative impacts on the River Indus due to the construction of GBHP as Water of river Indus will be diverted to the power channel and the river Indus flows go to its lowest in low flow season. The reduction in river flow may change the ecology of the river - belas and people dependant on river water. In this context a study was made to keep the negative environmental impacts as low as possible and suggest mitigation measures to reduce negative impacts and provide enhancement measure to compensate the losses to be sustained by the area people and maintain the social life along with the ecology of the area less disturbed. The study demonstrated that the project is technically sound, economically viable and has limited environmental and social impacts on the area overall and specific the belas and people dependant on the Indus Water from Tarbela downstream up to confluence of Kabul River. (author)

  14. Studies on reactor piping integrity during severe accident in WIND project

    International Nuclear Information System (INIS)

    In a severe accident of a light water reactor, the reactor coolant piping might be subjected to thermal loads resulted from decay heat release of the deposited fission products, and heat transfer from high temperature gases generated in the reactor core region in addition to an internal pressure load. Thermal and structural responses of the reactor coolant piping under elevated temperature and pressure conditions are being investigated in piping integrity tests in WIND (Wide Range Piping Integrity Demonstration) project at Japan Atomic Energy Research Institute. Four piping failure tests have been conducted using straight stainless steel pipes with a diameter of 114.3mm or 355.6mm which simulate a part of the reactor coolant piping. In a recent failure test in which a pipe with an outer diameter of 355.6mm and a wall thickness of 35.7mm was used and an internal pressure was kept at 10MPa, a failure of the pipe was observed when the maximum temperature of the pipe reached 1040degC after the temperature was sustained at 1000degC for about one hour. Several small openings were formed at the pipe failure in an area showing the maximum temperature. A history of the change in a vertical diameter was obtained from the measurement of displacement at the top and the bottom of the pipe at the center of heated area. An acceleration of piping ballooning was observed when the maximum temperature of the pipe became approximately 1000degC. It was confirmed in post-test observation that the pipe diameter in vertical and horizontal direction was remarkably enlarged and the pipe wall thickness was largely reduced. In parallel with the tests, a post-test analysis was performed using ABAQUS code. The results from 2D elasto-plastic creep analysis for a piping failure test with an outer diameter of 114.3mm and a wall thickness of 13.5mm qualitatively reproduced the final deformation including the diameter enlargement and the wall thinning. (author)

  15. Evaluation of dredged material proposed for ocean disposal from Eastchester Project Area, New York

    Energy Technology Data Exchange (ETDEWEB)

    Antrim, L.D.; Pinza, M.R.; Barrows, E.S.; Gardiner, W.W.; Tokos, J.J.S.; Gruendell, B.D.; Word, J.Q. [Battelle Marine Research Lab., Sequim, WA (United States)

    1996-07-01

    The objective of the Eastchester project (Federal Project [FP] No. 6) was to evaluate proposed dredged material from the Eastchester project area in the Hutchinson River to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Eastchester was one of seven waterways that the U. S. Army Corps of Engineers-New York District (USACE-NYD) requested the Battelle/Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in March 1994. The evaluation of proposed dredged material from the Eastchester project area consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, water- column and benthic acute toxicity tests, and bioaccumulation studies. Eighteen individual sediment core samples collected from the Eastchester project area were analyzed for grain size, moisture content, and total organic carbon (TOC). Two composite sediment samples, representing the upstream and lower reaches of the area proposed for dredging, were analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAHs), and 1,4- dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended-particulate phase (SPP) of the two Eastchester sediment composites, were analyzed for metals, pesticides, and PCBS. An additional 1 1 composite samples were created for the USACE-New England Division (USACE-NED) using the same 18 Eastchester core samples but combined into different composites. These composites were analyzed for metals, chlorinated pesticides, PCB congeners, PAHS, and 1,4-dichlorobenzene. Water-column or SPP toxicity tests were performed along with bioaccumulation tests.

  16. Global projections of 21st century land-use changes in regions adjacent to Protected Areas.

    Directory of Open Access Journals (Sweden)

    Linda J Beaumont

    Full Text Available The conservation efficiency of Protected Areas (PA is influenced by the health and characteristics of the surrounding landscape matrix. Fragmentation of adjacent lands interrupts ecological flows within PAs and will decrease the ability of species to shift their distribution as climate changes. For five periods across the 21(st century, we assessed changes to the extent of primary land, secondary land, pasture and crop land projected to occur within 50 km buffers surrounding IUCN-designated PAs. Four scenarios of land-use were obtained from the Land-Use Harmonization Project, developed for the Intergovernmental Panel on Climate Change's Fifth Assessment Report (AR5. The scenarios project the continued decline of primary lands within buffers surrounding PAs. Substantial losses are projected to occur across buffer regions in the tropical forest biomes of Indo-Malayan and the Temperate Broadleaf forests of the Nearctic. A number of buffer regions are projected to have negligible primary land remaining by 2100, including those in the Afrotropic's Tropical/Subtropical Grassland/Savanna/Shrubland. From 2010-2050, secondary land is projected to increase within most buffer regions, although, as with pasture and crops within tropical and temperate forests, projections from the four land-use scenarios may diverge substantially in magnitude and direction of change. These scenarios demonstrate a range of alternate futures, and show that although effective mitigation strategies may reduce pressure on land surrounding PAs, these areas will contain an increasingly heterogeneous matrix of primary and human-modified landscapes. Successful management of buffer regions will be imperative to ensure effectiveness of PAs and to facilitate climate-induced shifts in species ranges.

  17. Global projections of 21st century land-use changes in regions adjacent to Protected Areas.

    Science.gov (United States)

    Beaumont, Linda J; Duursma, Daisy

    2012-01-01

    The conservation efficiency of Protected Areas (PA) is influenced by the health and characteristics of the surrounding landscape matrix. Fragmentation of adjacent lands interrupts ecological flows within PAs and will decrease the ability of species to shift their distribution as climate changes. For five periods across the 21(st) century, we assessed changes to the extent of primary land, secondary land, pasture and crop land projected to occur within 50 km buffers surrounding IUCN-designated PAs. Four scenarios of land-use were obtained from the Land-Use Harmonization Project, developed for the Intergovernmental Panel on Climate Change's Fifth Assessment Report (AR5). The scenarios project the continued decline of primary lands within buffers surrounding PAs. Substantial losses are projected to occur across buffer regions in the tropical forest biomes of Indo-Malayan and the Temperate Broadleaf forests of the Nearctic. A number of buffer regions are projected to have negligible primary land remaining by 2100, including those in the Afrotropic's Tropical/Subtropical Grassland/Savanna/Shrubland. From 2010-2050, secondary land is projected to increase within most buffer regions, although, as with pasture and crops within tropical and temperate forests, projections from the four land-use scenarios may diverge substantially in magnitude and direction of change. These scenarios demonstrate a range of alternate futures, and show that although effective mitigation strategies may reduce pressure on land surrounding PAs, these areas will contain an increasingly heterogeneous matrix of primary and human-modified landscapes. Successful management of buffer regions will be imperative to ensure effectiveness of PAs and to facilitate climate-induced shifts in species ranges.

  18. Development of a standard methodology for integrating non-food crop production in rural areas with niche energy markets. Proceedings

    International Nuclear Information System (INIS)

    This project was supported as a Concerted Action under the EC DGVI AIR programme from 1993-1996. It has successfully developed a standard methodology to help integrate non-food crop production in rural areas with niche energy markets. The methodology was used to compare the costs of different energy crop production and conversion options across the six participating nations. The partners provide a representative cross-section of European agriculture and energy expertise. All partners agreed on three niche markets favourable for biomass and biofuels: small-scale heat markets (less than 1 MW th) for agro-industry, domestic and commercial buildings, medium-scale heat markets (1-10MWth), including cogeneration for light industry and district heating, and liquid biofuels as substitutes for fossil fuels in transport, heat and power applications. (Author)

  19. Impact Analysis of Coastal Engineering Projects on Mangrove Wetland Area Change with Remote Sensing

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    In the past decades, two large scale coastal engineering projects have been carried out in the Deep Bay surrounded by Shenzhen City and Hong Kong Special Administrative Region. One project is Shenzhen River channel regulation and the other is the sea reclamation along the seashore on the Shenzhen side. The two projects are very close to the two national nature reserves, specifically Futian in Shenzhen and Mai Po in Hong Kong, which are important wetland ecosystems worldwide. This paper aims to identify and monitor the mangrove wetland changes with time series of Landsat Thematic Mapper images pre and post to the two engineering projects being launched. Coupled analysis of the image interpretation results and tidal data acquired at the same time in the context of the two works reveals that the mangrove wetland area has increased from year 1989 to 1994, and has changed little from year 1994 to 2002. Binary coding is applied to reveal the distribution image of mangrove at each phase, and the coding image shows that the construction of the two coastal engineering projects has caused frequent changes in mangrove spatial distribution. The study also shows that the change is not significant regarding to the precision of the method and the natural evolution of mangrove wetland, and the projects do not cause apparently influences upon the two national mangrove conservation zones at least for the research time period.

  20. Technology strategy for integrated operations and real time reservoir management; Technology Target Areas; TTA5 - Integrated operations and RTRM

    Energy Technology Data Exchange (ETDEWEB)

    2007-07-01

    In Norway Integrated Operations (IO) is a concept which in the first phase (G1) has been used to describe how to integrate processes and people onshore and offshore using ICT solutions and facilities that improve onshore's ability to support offshore operationally. The second generation (G2) Integrated Operations aims to help operators utilize vendors' core competencies and services more efficiently. Utilizing digital services and vendor products, operators will be able to update reservoir models, drilling targets and well trajectories as wells are drilled, manage well completions remotely, optimize production from reservoir to export lines, and implement condition-based maintenance concepts. The total impact on production, recovery rates, costs and safety will be profound. When the international petroleum business moves to the Arctic region the setting is very different from what is the case on the Norwegian Continental Shelf (NCS) and new challenges will arise. The Norwegian Ministry of Environment has recently issued an Integrated Management Plan for the Barents Sea where one focus is on 'Monitoring of the Marine Environment in the North'. The Government aims to establish a new and more coordinated system for monitoring the marine ecosystems in the north. A representative group consisting of the major Operators, the Service Industry, Academia and the Authorities have developed the enclosed strategy for the OG21 Integrated Operations and Real Time Reservoir Management (IO and RTRM) Technology Target Area (TTA). Major technology and work process research and development gaps have been identified in several areas: Bandwidth down-hole to surface; Sensor development including Nano-technology; Cross discipline use of Visualisation, Simulation and model development particularly in Drilling and Reservoir management areas; Software development in terms of data handling, model updating and calculation speed; Enabling reliable and robust communications

  1. Integration of Optical and SAR Data for Burned Area Mapping in Mediterranean Regions

    Directory of Open Access Journals (Sweden)

    Daniela Stroppiana

    2015-01-01

    Full Text Available The aim of this paper is to investigate how optical and Synthetic Aperture Radar (SAR data can be combined in an integrated multi-source framework to identify burned areas at the regional scale. The proposed approach is based on the use of fuzzy sets theory and a region-growing algorithm. Landsat TM and (C-band ENVISAT Advanced Synthetic Aperture Radar (ASAR images acquired for the year 2003 have been processed to extract burned area maps over Portugal. Pre-post fire SAR backscatter temporal difference has been integrated with optical spectral indices to the aim of reducing confusion between burned areas and low-albedo surfaces. The output fuzzy score maps have been compared with reference fire perimeters provided by the Fire Atlas of Portugal. Results show that commission and omission errors in the output burned area maps are a function of the threshold applied to the fuzzy score maps; between the two extremes of the greatest producer’s accuracy (omission error < 10% and user’s accuracy (commission error < 5%, an intermediate threshold value provides errors of about 20% over the study area. The integration of SAR backscatter allowed reducing local commission errors from 65.4% (using optical data, only to 11.4%, showing to significantly mitigate local errors due to the presence of cloud shadows and wetland areas. Overall, the proposed method is flexible and open to further developments; also in the perspective of the European Space Agency (ESA Sentinel missions operationally providing SAR and optical datasets.

  2. Impacts of biogas projects on agro-ecosystem in rural areas-A case study of Gongcheng

    Institute of Scientific and Technical Information of China (English)

    Jin YANG; Weichao CHEN; Bin CHEN

    2011-01-01

    The rapid growth of agro-ecosystem has been the focus of "New Rural Construction" in China due to intensive energy consumption and environmental pollution in rural areas.As a kind of renewable energy,biogas is helpful for new energy development and plays an important role in the sustainable development of agroecosystem in China.To evaluate the effects of biogas on agro-ecosystem from a systematic angle,we discussed the status quo of household biogas and identified its main factors that may have impacts on agro-ecosystem.An indicator framework covering environmental,social and economic aspects was established to quantify the impacts exerted by biogas project on agro-ecosystem.A case study of Gongcheng was then conducted to evaluate the combined impact of biogas project using the proposed indicator framework.Results showed that there was a notable positive effect brought by the application of biogas,and the integrated benefit has been significantly improved by 60.36%,implying that biogas as a substitute energy source can promote the sustainable level of rural areas.

  3. Greenhouse systems with integrated water desalination for arid areas based on solar energy

    OpenAIRE

    Chaibi, M.Thameur

    2003-01-01

    The limited water resources in arid areas have led to the use of low-quality irrigation water in agriculture which may reduce crop yields and damage the environment. This study is focused on a greenhouse concept with integrated water desalination considered for small scale applications at remote locations in areas where only saline water is available. In this greenhouse the roof light transmission is reduced as solar radiation is absorbed by a layer of flowing water on a glass covered by a to...

  4. Integration of geophysical datasets by a conjoint probability tomography approach: application to Italian active volcanic areas

    Directory of Open Access Journals (Sweden)

    D. Patella

    2008-06-01

    Full Text Available We expand the theory of probability tomography to the integration of different geophysical datasets. The aim of the new method is to improve the information quality using a conjoint occurrence probability function addressed to highlight the existence of common sources of anomalies. The new method is tested on gravity, magnetic and self-potential datasets collected in the volcanic area of Mt. Vesuvius (Naples, and on gravity and dipole geoelectrical datasets collected in the volcanic area of Mt. Etna (Sicily. The application demonstrates that, from a probabilistic point of view, the integrated analysis can delineate the signature of some important volcanic targets better than the analysis of the tomographic image of each dataset considered separately.

  5. Earthquake Disaster Simulation for an Urban Area, with GIS, CAD,FEA, and VR Integration

    Institute of Scientific and Technical Information of China (English)

    XU Feng; CHEN Xuping; REN Aizhu; LU Xinzheng

    2008-01-01

    For a disaster whose scale includes an urban area, it is difficult to be studied with physical ex-periments. Numerical simulation is found a very efficient tool for such problem. This paper aims at developing an integrated urban earthquake simulation system (UESS) that uses GIS as the model source, CAD as the model generating tools, FEA as damage prediction, and virtual reality (VR) as the post-process platform. Anautomatic procedure was developed to buildup the 3D structural model of buildings in an urban area, as well as to simulate their earthquake performances, from the digital map of GIS. And the simulation results were presented in an integrated interface with a GIS view-port for position finding, a CAD view-port for 3D struc-tural damage identification, and a VR view-port for 3D dynamic structural vibration display. An urban example with more than 7000 buildings was select to demonstrate the feasibility of proposed system.

  6. Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    2006-10-25

    The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

  7. Ventral tegmental area GABA projections pause accumbal cholinergic interneurons to enhance associative learning.

    Science.gov (United States)

    Brown, Matthew T C; Tan, Kelly R; O'Connor, Eoin C; Nikonenko, Irina; Muller, Dominique; Lüscher, Christian

    2012-12-20

    The ventral tegmental area (VTA) and nucleus accumbens (NAc) are essential for learning about environmental stimuli associated with motivationally relevant outcomes. The task of signalling such events, both rewarding and aversive, from the VTA to the NAc has largely been ascribed to dopamine neurons. The VTA also contains GABA (γ-aminobutyric acid)-releasing neurons, which provide local inhibition and also project to the NAc. However, the cellular targets and functional importance of this long-range inhibitory projection have not been ascertained. Here we show that GABA-releasing neurons of the VTA that project to the NAc (VTA GABA projection neurons) inhibit accumbal cholinergic interneurons (CINs) to enhance stimulus-outcome learning. Combining optogenetics with structural imaging and electrophysiology, we found that VTA GABA projection neurons selectively target NAc CINs, forming multiple symmetrical synaptic contacts that generated inhibitory postsynaptic currents. This is remarkable considering that CINs represent a very small population of all accumbal neurons, and provide the primary source of cholinergic tone in the NAc. Brief activation of this projection was sufficient to halt the spontaneous activity of NAc CINs, resembling the pause recorded in animals learning stimulus-outcome associations. Indeed, we found that forcing CINs to pause in behaving mice enhanced discrimination of a motivationally important stimulus that had been associated with an aversive outcome. Our results demonstrate that VTA GABA projection neurons, through their selective targeting of accumbal CINs, provide a novel route through which the VTA communicates saliency to the NAc. VTA GABA projection neurons thus emerge as orchestrators of dopaminergic and cholinergic modulation in the NAc.

  8. Mixed waste focus area integrated technical baseline report. Phase I, Volume 2: Revision 0

    International Nuclear Information System (INIS)

    This document (Volume 2) contains the Appendices A through J for the Mixed Waste Focus Area Integrated Technical Baseline Report Phase I for the Idaho National Engineering Laboratory. Included are: Waste Type Managers' Resumes, detailed information on wastewater, combustible organics, debris, unique waste, and inorganic homogeneous solids and soils, and waste data information. A detailed list of technology deficiencies and site needs identification is also provided

  9. Integrating coastal zone dialogue : can initial networking of partners reduce conflicts in marine coastal areas?

    OpenAIRE

    Lacroix, Denis; Simard, François

    2010-01-01

    Integrated Coastal Zone Management (ICZM) is a link between three main fields: environment, society and economics. All of them are under strong and contradictory pressures with numerous factors and limited up-to-date and consistent knowledge. Nevertheless, decision makers have to find methods and means to manage the sustainable development of the coastal area, a place where different and frequently conflicting uses are steadily increasing, notably along the Mediterranean coastline. Numerous g...

  10. Mixed waste focus area integrated technical baseline report. Phase I, Volume 2: Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-16

    This document (Volume 2) contains the Appendices A through J for the Mixed Waste Focus Area Integrated Technical Baseline Report Phase I for the Idaho National Engineering Laboratory. Included are: Waste Type Managers` Resumes, detailed information on wastewater, combustible organics, debris, unique waste, and inorganic homogeneous solids and soils, and waste data information. A detailed list of technology deficiencies and site needs identification is also provided.

  11. Well Completion Report for Corrective Action Unit 447, Project Shoal Area, Churchill County, Nevada

    International Nuclear Information System (INIS)

    This Well Completion Report is being provided as part of the implementation of the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit (CAU) 447 (NNSA/NSO, 2006a). The CADD/CAP is part of an ongoing U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) funded project for the investigation of CAU 447 at the Project Shoal Area (PSA). All work performed on this project was conducted in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996), and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. Investigation activities included the drilling, construction, and development of three monitoring/validation (MV) wells at the PSA. This report summarizes the field activities and data collected during the investigation

  12. The INTEGRATE project: Delivering solutions for efficient multi-centric clinical research and trials.

    Science.gov (United States)

    Kondylakis, Haridimos; Claerhout, Brecht; Keyur, Mehta; Koumakis, Lefteris; van Leeuwen, Jasper; Marias, Kostas; Perez-Rey, David; De Schepper, Kristof; Tsiknakis, Manolis; Bucur, Anca

    2016-08-01

    The objective of the INTEGRATE project (http://www.fp7-integrate.eu/) that has recently concluded successfully was the development of innovative biomedical applications focused on streamlining the execution of clinical research, on enabling multidisciplinary collaboration, on management and large-scale sharing of multi-level heterogeneous datasets, and on the development of new methodologies and of predictive multi-scale models in cancer. In this paper, we present the way the INTEGRATE consortium has approached important challenges such as the integration of multi-scale biomedical data in the context of post-genomic clinical trials, the development of predictive models and the implementation of tools to facilitate the efficient execution of postgenomic multi-centric clinical trials in breast cancer. Furthermore, we provide a number of key "lessons learned" during the process and give directions for further future research and development. PMID:27224847

  13. 34 CFR 425.1 - What is the Demonstration Projects for the Integration of Vocational and Academic Learning Program?

    Science.gov (United States)

    2010-07-01

    ... of Vocational and Academic Learning Program? 425.1 Section 425.1 Education Regulations of the Offices... EDUCATION DEMONSTRATION PROJECTS FOR THE INTEGRATION OF VOCATIONAL AND ACADEMIC LEARNING PROGRAM General § 425.1 What is the Demonstration Projects for the Integration of Vocational and Academic...

  14. CanWEA regional issues and wind energy project siting : mountainous areas

    Energy Technology Data Exchange (ETDEWEB)

    D' Entremont, M. [Jacques Whitford Ltd., Vancouver, BC (Canada)]|[Axys Environmental Consulting Ltd., Vancouver, BC (Canada)

    2008-07-01

    Planning and permitting considerations for wind energy project siting in mountainous areas were discussed. Mountainous regions have a specific set of environmental and socio-economic concerns. Potential disruptions to wildlife, noise, and visual impacts are a primary concern in the assessment of potential wind farm projects. Alpine habitats are unique and often contain fragile and endangered species. Reclamation techniques for mountainous habitats have not been extensively tested, and the sites are not as resilient as sites located in other ecosystems. In addition, alpine habitats are often migratory corridors and breeding grounds for threatened or endangered birds. In the winter months, alpine habitats are used by caribou, grizzly bears, and wolverine dens. Bats are also present at high elevations. It is often difficult to conduct baseline and monitoring studies in mountainous areas since alpine habitat is subject to rapid weather changes, and has a very short construction period. tabs., figs.

  15. Camera Calibration for Water-Biota Research: The Projected Area of Vegetation

    Directory of Open Access Journals (Sweden)

    Rene Wackrow

    2015-12-01

    Full Text Available Imaging systems have an indisputable role in revealing vegetation posture under diverse flow conditions, image sequences being generated with off the shelf digital cameras. Such sensors are cheap but introduce a range of distortion effects, a trait only marginally tackled in hydraulic studies focusing on water-vegetation dependencies. This paper aims to bridge this gap by presenting a simple calibration method to remove both camera lens distortion and refractive effects of water. The effectiveness of the method is illustrated using the variable projected area, computed for both simple and complex shaped objects. Results demonstrate the significance of correcting images using a combined lens distortion and refraction model, prior to determining projected areas and further data analysis. Use of this technique is expected to increase data reliability for future work on vegetated channels.

  16. STYLE - A European project on structural integrity: Progress of the work after 2 Years

    International Nuclear Information System (INIS)

    The purpose of this paper is to present the progress of the work on the EURATOM project STYLE (Structural integrity for lifetime management - non-RPV components). The project focuses on the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management. The 4-years project started in January 2010 and is now in its third year. Within STYLE realistic failure models for some of the key components will be identified. The range of assessment tools considered will include those for assessment of component failure by advanced fracture mechanics analyses validated on small and large scale experiments, quantification of weld residual stresses by numerical analysis and by measurements, stress corrosion crack initiation and growth effects and assessment of RCPB components (excluding the reactor pressure vessel) under dynamic and seismic loading. Based on theoretical and experimental results, performance assessment and further development of simplified engineering assessment methods (EAM) will be carried out considering both deterministic and probabilistic approaches. Integrity assessment case studies and large scale demonstration experiments will be performed on Mock-ups of safety relevant components. These will include a repair weld in an aged butt-welded austenitic pipe, a dissimilar narrow gap TIG weld (following the EPR design) and a cladded ferritic pipe. Moreover, experiments on specimens and feature test pieces will be carried out to support the large scale Mock-up analyses. The end product of the project ('STYLE TOOLS') will comprise best practice guidelines on the use of advanced tools, on improvement and qualification of EAM as a part of European Leak-before-break (LBB) procedures and on life time management of the integrity of RCPB components in European nuclear power plants. The project is interacting with the European Network of Excellence NUGENIA (former NULIFE). (author)

  17. Managing the schools : the educator's perceptions in the Lichtenburg Area Project Office / Sibongile Esther Novunga

    OpenAIRE

    Novunga, Sibongile Esther

    2004-01-01

    The purpose of the study was to determine the perception of educators on managing change in schools of Lichtenburg Area Project Office. A questionnaire with four-licket scale was used. The questionnaire incl~ded the questions on some factors that may result \\ '· in poor management of change in schools, the promoting management of change in education, the development of human resource through training and the change in curriculwn. Two open-ended questions\\ were also asked ...

  18. Projected distribution shifts and protected area coverage of range-restricted Andean birds under climate change

    OpenAIRE

    Verónica del Rosario Avalos; Jaime Hernández

    2015-01-01

    In this study we projected the effect of anthropogenic climate change in endemic and restricted-range Andean bird species that spread out from the center of Bolivia to southeastern Peru. We also analyzed the representation of these species in protected areas. The ensemble forecasts from niche-based models indicated that 91–100% of species may reduce their range size under full and no dispersal scenarios, including five species that are currently threatened. The large range reduction (average ...

  19. Accounting methods for carbon credits: Impacts on the minimum area of CDM forestry projects

    OpenAIRE

    Locatelli, Bruno; Pedroni, Lucio

    2004-01-01

    International audience The Ninth Conference of the Parties (COP-9) decided to adopt an accounting system based on expiring carbon credits to address the problem of non-permanent carbon storage in forests established under the Clean Development Mechanism (CDM). This article reviews and discusses carbon accounting methods that were under consideration before COP-9 and presents a model which calculates the minimum area that forest plantation projects should reach to be able to compensate CDM ...

  20. Evaluation of dredged material proposed for ocean disposal from Arthur Kill Project Area, New York

    Energy Technology Data Exchange (ETDEWEB)

    Gruendell, B.D.; Barrows, E.S.; Borde, A.B. [Battelle Marine Sciences Lab., Sequim, WA (United States)

    1997-01-01

    The objective of the bioassay reevaluation of Arthur Kill Federal Project was to reperform toxicity testing on proposed dredged material following current ammonia reduction protocols. Arthur Kill was one of four waterways sampled and evaluated for dredging and disposal in April 1993. Sediment samples were recollected from the Arthur Kill Project areas in August 1995. Tests and analyses were conducted according to the manual developed by the USACE and the U.S. Environmental Protection Agency (EPA), Evaluation of Dredged Material Proposed for Ocean Disposal (Testing Manual), commonly referred to as the {open_quotes}Green Book,{close_quotes} and the regional manual developed by the USACE-NYD and EPA Region II, Guidance for Performing Tests on Dredged Material to be Disposed of in Ocean Waters. The reevaluation of proposed dredged material from the Arthur Kill project areas consisted of benthic acute toxicity tests. Thirty-three individual sediment core samples were collected from the Arthur Kill project area. Three composite sediments, representing each reach of the area proposed for dredging, was used in benthic acute toxicity testing. Benthic acute toxicity tests were performed with the amphipod Ampelisca abdita and the mysid Mysidopsis bahia. The amphipod and mysid benthic toxicity test procedures followed EPA guidance for reduction of total ammonia concentrations in test systems prior to test initiation. Statistically significant acute toxicity was found in all Arthur Kill composites in the static renewal tests with A. abdita, but not in the static tests with M. bahia. Statistically significant acute toxicity and a greater than 20% increase in mortality over the reference sediment was found in the static renewal tests with A. abdita. M. bahia did not show statistically significant acute toxicity or a greater than 10% increase in mortality over reference sediment in static tests. 5 refs., 2 figs., 2 tabs.