WorldWideScience

Sample records for area follow-up inspection

  1. Which follow-up by the CLIs for the 3. decennial inspections?

    International Nuclear Information System (INIS)

    Rollinger, Francois; Delalonde, Jean-Claude; Rousseau, Jean-Marie; Paulmaz, Xavier; Junker, R.; Sene, M.; Hubert, F.; Paulmaz, X.; Tindillere, M.; Lheureux, Y.

    2010-11-01

    This document contains contributions presented by representatives of the IRSN, EDF and CLIs. The first session addressed issues related to decennial inspections. The contributions proposed a presentation of the safety re-examination of EDF 900 MWe reactors at the occasion of the 3. decennial inspections, a presentation of IRSN works on skill management in electric power production nuclear plants (CNPEs), a presentation (by EDF) of these 3. decennial inspections, a presentation (by the Fessenheim CLI) of the implementation of the 3. decennial inspection in Fessenheim, and a discussion by the Blayais CLI of follow-up perspectives after a decennial inspection. The second session addressed issues not related to decennial inspections. It contains two presentations respectively made by the Gravelines CLI (an analysis of significant safety events) and Dampierre CLI (problematic of skill management in CNPEs)

  2. Shillapoo Wildlife Area 2007 Follow-up HEP Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-03-01

    In April and May 2007 the Regional HEP Team (RHT) conducted a follow-up HEP analysis on the Egger (612 acres) and Herzog (210 acres) parcels located at the north end of the Shillapoo Wildlife Area. The Egger and Herzog parcels have been managed with Bonneville Power Administration funds since acquired in 1998 and 2001 respectively. Slightly more than 936 habitat units (936.47) or 1.14 HUs per acre was generated as an outcome of the 2007 follow-up HEP surveys. Results included 1.65 black-capped chickadee HUs, 280.57 great blue heron HUs, 581.45 Canada goose HUs, 40 mallard HUs, and 32.80 mink HUs. Introduction A follow-up Habitat Evaluation Procedures (HEP) (USFWS 1980) analysis was conducted by the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) during April and May 2007 to document changes in habitat quality and to determine the number of habitat units (HUs) to credit Bonneville Power Administration (BPA) for providing operation and maintenance (O&M) funds since WDFW acquired the parcels. The 2007 follow-up HEP evaluation was limited to Shillapoo Wildlife Area (SWA) parcels purchased with Bonneville Power Administration funds. D. Budd (pers. comm.) reported WDFW purchased the 612 acre Egger Farms parcel on November 2, 1998 for $1,737,0001 and the 210 acre Herzog acquisition on June 21, 2001 for $500,000 with Memorandum of Agreement funds (BPA and WDFW 1996) as partial fulfillment of BPA's wildlife mitigation obligation for construction of Bonneville and John Day Dams (Rasmussen and Wright 1989). Anticipating the eventual acquisition of the Egger and Herzog properties, WDFW conducted HEP surveys on these lands in 1994 to determine the potential number of habitat units to be credited to BPA. As a result, HEP surveys and habitat unit calculations were completed as much as seven years prior to acquiring the sites. The term 'Shillapoo Wildlife Area' will be used to describe only the Herzog and Egger parcels in this

  3. Publication of the inspection follow-up letters of the ASN on its site web asn.gouv.fr; Publication des lettres de suite d'inspection de l'ASN sur son site web asn.gouv.fr

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    Since February 2002, the French authority of nuclear safety (ASN) publishes on its web site (http://www.asn.gouv.fr) the letters addressed to the operators of nuclear facilities at the end of its inspections. The ASN carries out about 700 inspections every year which concern the French nuclear facilities, the central services of nuclear operators or of their suppliers, and the transports of nuclear materials. Each inspection is followed by a follow-up letter which mentions all anomalies noticed during the inspection and eventually asks for some remedial actions or for some complements of information. This document brings together the letters published between february and May 2002 and concerning the on-site inspections of nuclear facilities (EdF nuclear power plants, CEA centers, Cogema facilities, other sites) and the off-site inspections (Andra, transports of nuclear materials). (J.S.)

  4. Predictors of default from follow-up care in a cervical cancer screening program using direct visual inspection in south-western Nigeria.

    Science.gov (United States)

    Ezechi, Oliver Chukwujekwu; Petterson, Karen Odberg; Gbajabiamila, Titilola A; Idigbe, Ifeoma Eugenia; Kuyoro, Olutunmike; Ujah, Innocent Achaya Otobo; Ostergren, Per Olof

    2014-03-31

    Increasingly evidence is emerging from south East Asia, southern and east Africa on the burden of default to follow up care after a positive cervical cancer screening/diagnosis, which impacts negatively on cervical cancer prevention and control. Unfortunately little or no information exists on the subject in the West Africa sub region. This study was designed to determine the proportion of and predictors and reasons for default from follow up care after positive cervical cancer screen. Women who screen positive at community cervical cancer screening using direct visual inspection were followed up to determine the proportion of default and associated factors. Multivariate logistic regression was used to determine independent predictors of default. One hundred and eight (16.1%) women who screened positive to direct visual inspection out of 673 were enrolled into the study. Fifty one (47.2%) out of the 108 women that screened positive defaulted from follow-up appointment. Women who were poorly educated (OR: 3.1, CI: 2.0 - 5.2), or lived more than 10 km from the clinic (OR: 2.0, CI: 1.0 - 4.1), or never screened for cervical cancer before (OR: 3.5, CI:3:1-8.4) were more likely to default from follow-up after screening positive for precancerous lesion of cervix . The main reasons for default were cost of transportation (48.6%) and time constraints (25.7%). The rate of default was high (47.2%) as a result of unaffordable transportation cost and limited time to keep the scheduled appointment. A change from the present strategy that involves multiple visits to a "see and treat" strategy in which both testing and treatment are performed at a single visit is recommended.

  5. ANCCLI Scientific Committee - Follow-up of decennial inspections of basic nuclear installations and implication in their operation follow-up. Methodological guide for local information commissions

    International Nuclear Information System (INIS)

    2014-08-01

    This document briefly comments how the assessment and evolution of reactor safety are performed, indicates the various purposes and objectives of a decennial inspection, outlines the specific importance of the third decennial inspections, and presents how a CLI (local information commission) should perform an independent expertise at the occasion of a decennial inspection. It notably indicates which document are available for the different aspects of this inspection (vessel, confinement enclosure, primary and secondary cooling circuits, steam generators, ageing management, reactor safety re-examination, seismic risk, radiation protection, environment, organisational factors)

  6. [A follow-up study of the elderly in agricultural and piscatorial areas of Hokkaido].

    Science.gov (United States)

    Mori, M; Goto, R; Masuoka, H; Yoshida, K; Miyake, H

    1990-02-01

    A base-line survey was performed for 3,185 persons over 40 years of age in 1984 and 1985 in agricultural and piscatorial areas of Hokkaido with regards to their dietary habits and life style. Of them, 147 persons died prior to the recent follow-up survey of 1988. As a result of a case-control study of the dead with those of the followed-up group, a more frequent intake of instant noodles was indicated as significantly increasing the risk of death, even after adjusting for the health status at the base-line survey and other confounding variables (the adjusted relative risk = 1.44 per a frequency class, p = 0.049).

  7. RPII Inspection and Licensing Activities and Annual Inspection Programme for 2011

    International Nuclear Information System (INIS)

    2010-07-01

    The objective of this report is to provide an overview of inspection activities of the Radiological Protection Institute of Ireland, to examine the evolution in licensee numbers and to outline the rationale in developing annual inspection programmes. All inspection activities are now carried out within the framework of a quality management system including: inspection planning, the training of inspectors, the conduct of inspections as well as inspection follow up and review. The report also provides an overview of the main features of the quality system

  8. RPII Inspection and Licensing Activities and Annual Inspection Programme for 2013

    International Nuclear Information System (INIS)

    2013-04-01

    The objective of this report is to provide an overview of inspection activities of the Radiological Protection Institute of Ireland RPII, to examine the evolution in licensee numbers and to outline the rationale in developing annual inspection programmes. All inspection activities are now carried out within the framework of a quality management system including inspection planning, the training of inspectors, the conduct of inspections as well as post inspection follow up and review. This report also provides an overview of the main features of the quality system

  9. B Plant Complex generator dangerous waste storage areas inspection plan: Revision 1

    International Nuclear Information System (INIS)

    Beam, T.G.

    1994-01-01

    This document contains the inspection plan for the <90 day dangerous/mixed waste storage areas and satellite accumulation areas at B Plant Complex. This inspection plan is designed to comply with all applicable federal, state and US Department of Energy-Richland Operations Office training requirements. In particular, the requirements of WAC 173-303 ''Dangerous Waste Regulations'' are met by this inspection plan. This inspection plan is designed to provide B Plant Complex with the records and documentation showing that the waste storage and handling program is in compliance with applicable regulations. The plan also includes the requirements for becoming a qualified inspector of waste storage areas and the responsibilities of various individuals and groups at B Plant Complex

  10. Advances in technologies for feeder pipe inspections

    Energy Technology Data Exchange (ETDEWEB)

    Ten Grotenhuis, R.; Verma, Y.; Hitchcox, T.; Sakuta, A. [Ontario Power Generation, Inspection and Maintenance Div., Toronto, Ontario (Canada)

    2014-07-15

    The successful development of the Matrix Inspection Technique (MIT) for feeder weld area applications has been followed up with a project to leverage the technology to address other aspects of feeder inspection. The goal of the project is to adapt the technology to provide full circumferential inspection of feeder pipes for FAC thinning and, potentially, for axial cracking. The project necessitated evolving a new generation of high speed, high element count data acquisition instruments. It also required the development of custom inspection arrays, innovative approaches to sealing the water column, use of inertial motion sensors to synthesize encoder inputs, real-time visual feedback for the operator, and enhanced automated analysis software capable of plotting the inspected configuration in 3D. The individual components of the system are currently being integrated into a whole. The results obtained to date demonstrate the approach to be fundamentally sound. (author)

  11. Feature-Learning-Based Printed Circuit Board Inspection via Speeded-Up Robust Features and Random Forest

    Directory of Open Access Journals (Sweden)

    Eun Hye Yuk

    2018-06-01

    Full Text Available With the coming of the 4th industrial revolution era, manufacturers produce high-tech products. As the production process is refined, inspection technologies become more important. Specifically, the inspection of a printed circuit board (PCB, which is an indispensable part of electronic products, is an essential step to improve the quality of the process and yield. Image processing techniques are utilized for inspection, but there are limitations because the backgrounds of images are different and the kinds of defects increase. In order to overcome these limitations, methods based on machine learning have been used recently. These methods can inspect without a normal image by learning fault patterns. Therefore, this paper proposes a method can detect various types of defects using machine learning. The proposed method first extracts features through speeded-up robust features (SURF, then learns the fault pattern and calculates probabilities. After that, we generate a weighted kernel density estimation (WKDE map weighted by the probabilities to consider the density of the features. Because the probability of the WKDE map can detect an area where the defects are concentrated, it improves the performance of the inspection. To verify the proposed method, we apply the method to PCB images and confirm the performance of the method.

  12. Post-Closure Inspection Report for Corrective Action Unit 90: Area 2 Bitcutter Containment, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Corrective Action Unit (CAU) 90, Area 2 Bitcutter Containment, is identified in the ''Federal Facility Agreement and Consent Order'' of 1996. The post-closure requirements for CAU 90 are described in Section VII.B.8.b of the Nevada Test Site ''Resource Conservation and Recovery Act'' Permit for a Hazardous Waste Management Facility Number NEV HW0021, dated November 2005. Post-closure activities consist of the following: Semiannual inspections of the site using inspection checklists; Photographic documentation; Field note documentation; and Preparation and submittal of an annual Post-Closure Inspection Report. This annual report covers the period of July 2006 to June 2007 and consists of a summary of the results of the inspections, copies of the inspection checklists and field notes, maintenance and repair records (if any), photographs, and conclusions and recommendations. The inspection checklists are provided in Appendix A, a copy of the field notes is provided in Appendix B, and copies of photographs taken during the inspections are provided in Appendix C

  13. Runway Inspection by RPAS

    Directory of Open Access Journals (Sweden)

    Stanislav Absolon

    2015-10-01

    Full Text Available This article discusses the use of the RPAS for the inspection of the airport operating areas. The paper compares the current process of the inspection of the airport operating areas by the airport staff with the possibilities which are offered by the use of the modern technology RPAS. The following text also describes how to inspect airport operating areas by the RPAS, specific technical possibilities and the applicable technical solutions. Furthermore there are variants of piloting the RPAS, comparing usable equipment, equipment for video recording and the possibility of using thermal imaging camera in the article.

  14. Post-Closure Inspection Report for Corrective Action Unit 90: Area 2 Bitcutter Containment, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2008-01-01

    Corrective Action Unit (CAU) 90, Area 2 Bitcutter Containment, is identified in the Federal Facility Agreement and Consent Order of 1996, as amended February 2008. The post-closure requirements for CAU 90 are described in Section VII.B.8.b of the Nevada Test Site Resource Conservation and Recovery Act Permit for a Hazardous Waste Management Facility Number NEV HW0021, dated November 2005. Post-closure activities consist of the following: (1) Semiannual inspections of the site using inspection checklists; (2) Photographic documentation; (3) Field note documentation; and (4) Preparation and submittal of an annual Post-Closure Inspection Report. This annual report covers the period of July 2007 to June 2008 and consists of a summary of the results of the inspections, copies of the inspection checklists and field notes, maintenance and repair records (if any), photographs, and conclusions and recommendations. The inspection checklists are provided in Appendix A, a copy of the field notes is provided in Appendix B, and copies of photographs taken during the inspections are provided in Appendix C

  15. RPII Inspection and Licensing Activities and Annual Inspection Programme for 2012

    International Nuclear Information System (INIS)

    2012-04-01

    The purpose of this document is to promote transparency in the activities of the RPII. It explains aspects of the internal workings of the Regulation and Information Management Division of the Institute to aid understanding of the processes and decisions of that Division which may impact on licensees and other interested parties. The objective of the report is to provide an overview of inspection activities of the RPII, to examine the evolution in licensee numbers and to outline the rationale in developing annual inspection programmes. All inspection activities are now carried out within the framework of a quality management system including; inspection planning, the training of inspectors, the conduct of inspections, as well as post inspection follow up and review. This report also provides an overview of the main features of the quality system

  16. Development of automated ultrasonic device for in-service inspection of ABWR pressure vessel bottom head

    International Nuclear Information System (INIS)

    Kojima, Y.; Matsuyama, A.

    1995-01-01

    An automated device and its controller have been developed for the bottom head weld examination of pressure vessel of Advanced Boiling Water Reactor (ABWR). The internal pump casings and the housings of control rod prevent a conventional ultrasonic device from scanning the required inspection zone. With this reason, it is required to develop a new device to examine the bottom head area of ABWR. The developed device is characterized by the following features. (1) Composed of a mother vehicle and a compact inspection vehicle. They are connected only by an electric wire without using the conventional arm mechanism. (2) The mother vehicle travels on a track and lift up the inspection vehicle to the vessel. (3) The mother vehicle can automatically attach the inspection vehicle to the bottom head, and detach the inspection vehicle from it. (4) Collision avoidance control function with a touch sensor is installed at the front of the inspection vehicle. The device was successfully demonstrated using a mock-up of reactor pressure vessel

  17. Report on follow-up for joint research of valuable resources recovery techniques from brackish water; Kansuichu no yuka shigen kaishu gijutsu ni kansuru kenkyu kyoryoku follow up hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This report describes follow-up for research and development on the recovery of valuable resources, such as magnesium, bromine and boron, contained in the brackish water for manufacture of common salt in the coastal region of Mexico. For the field survey, salt garden, irrigation plant and manufacturing plant of dinning salt were inspected. The optimum site was examined by assuming desalination plant and solar pond. The groundwater in coastal regions is progressively salified. Since the coastal region is a tourist resort with an round-trip area of whales, environmental protection is indispensable. For the joint research with invited researchers, the solar pond system and fresh water generation were studied. As a result, it was found that the solar pond system is an excellent method for keeping thermal energy in a low cost at the salt garden with abundant solar energy, and that the desalination system combined with distilling is the most suitable method. 7 refs., 8 figs., 1 tab.

  18. Pharmacotherapy follow-up: Role in active malaria surveillance in a travel medicine centre outside the transmission area in Brazil.

    Science.gov (United States)

    Pedro, R S; Brasil, P; Pina-Costa, A; Machado, C R; Damasceno, L S; Daniel-Ribeiro, C T; Guaraldo, L

    2017-12-01

    Malaria is a potentially severe disease, widespread in tropical and subtropical areas. Apart from parasite drug resistance, which receives the largest share of attention, several factors directly influence the response to antimalarial treatment such as incorrect doses, adverse drug events, lack of adherence to treatment, drug quality and drug-drug interactions. Pharmacotherapy follow-up can be used to monitor and improve the effectiveness of treatment, prevent drug-related problems and ensure patient safety. The aim of this study was to describe the results of the implementation of pharmacotherapy follow-up of patients with malaria seen at a reference centre for malaria diagnosis and treatment (CPD-Mal) located in the city of Rio de Janeiro, an area without malaria transmission. A descriptive study was conducted from January 2009 to September 2013 at the Instituto Nacional de Infectologia Evandro Chagas (INI) of the Fundação Oswaldo Cruz (Fiocruz). All malaria patients enrolled in the study were treated according to the Brazilian Malaria Therapy Guidelines. Data collected during pharmacotherapy follow-up were recorded in a standardized form. The variables included were age, gender, comorbidities, antimalarials and concomitant medications used, adverse drug reactions (ADR), clinical and parasitological cure times, and treatment outcomes classified as success, recurrence (recrudescence or relapse); and lost to follow-up. The ADR were classified by severity (DAIDS-NIH), organ system affected (WHO-ART) and likelihood to be caused by drugs (Naranjo scale). One hundred thirteen cases of malaria were included. Patients were aged between 13 and 66 years and the majority of them (75.2%) were male. Ninety-four ADR were observed, most classified as mild (85.1%), related to disorders of the gastrointestinal system (63.8%), such as nausea and vomiting, and assessed as "possibly" caused by the antimalarial drugs (91.5%). The majority of clinical (90.9%) and parasitological

  19. The follow-up time issue on small roundabouts

    Directory of Open Access Journals (Sweden)

    Janusz WOCH

    2008-01-01

    Full Text Available The follow-up time was investigated. The aim of this analysis was to create a formula that allows the follow-up time calculated using the most important external parameters. The studies were based on empirical data collected at small roundabouts localized on Upper Silesia. The follow-up time is the average time gap between two cars of the minor stream being queued and entered the same major stream gap one behind the other. Follow-up times were measured directly by observing traffic flow. Resulting follow-up times were analyzed to determine their dependence on parameters such as intersection layout, roundabouts diameter and left visibility. These parameters were tested using the conventional calculation method (regression analysis. The dependence of follow-up time was then integrated into the own capacity estimation method for small roundabouts localized on urban areas. One of the biggest advantages this dependence is that capacity and traffic flow on small roundabouts can be determined reliably and appropriately for actual situations. The new follow-up time values for all range of external diameters of small roundabout 26 (22 – 40 m have been presented in this article.

  20. Waste Calcining Facility remote inspection report

    International Nuclear Information System (INIS)

    Patterson, M.W.; Ison, W.M.

    1994-08-01

    The purpose of the Waste Calcining Facility (WCF) remote inspections was to evaluate areas in the facility which are difficult to access due to high radiation fields. The areas inspected were the ventilation exhaust duct, waste hold cell, adsorber manifold cell, off-gas cell, calciner cell and calciner vessel. The WCF solidified acidic, high-level mixed waste generated during nuclear fuel reprocessing. Solidification was accomplished through high temperature oxidation and evaporation. Since its shutdown in 1981, the WCFs vessels, piping systems, pumps, off-gas blowers and process cells have remained contaminated. Access to the below-grade areas is limited due to contamination and high radiation fields. Each inspection technique was tested with a mock-up in a radiologically clean area before the equipment was taken to the WCF for the actual inspection. During the inspections, essential information was obtained regarding the cleanliness, structural integrity, in-leakage of ground water, indications of process leaks, indications of corrosion, radiation levels and the general condition of the cells and equipment. In general, the cells contain a great deal of dust and debris, as well as hand tools, piping and miscellaneous equipment. Although the building appears to be structurally sound, the paint is peeling to some degree in all of the cells. Cracking and spalling of the concrete walls is evident in every cell, although the east wall of the off-gas cell is the worst. The results of the completed inspections and lessons learned will be used to plan future activities for stabilization and deactivation of the facility. Remote clean-up of loose piping, hand tools, and miscellaneous debris can start immediately while information from the inspections is factored into the conceptual design for deactivating the facility

  1. Conclusions with regard to the inspection goals of a system of material balance areas

    International Nuclear Information System (INIS)

    Gladitz, J.

    1989-01-01

    Starting from IAEA inspection goals in the control of individual material balance area, procedures of computation and estimation of inspection goals are derived for a system of material balance areas allowing for an optimal diversion strategy. By it the prerequisites were also developed to an evaluation of these goals for a State as a whole. (author)

  2. Serological Follow up in 50 Brucellosis Cases in a Rural Area

    Directory of Open Access Journals (Sweden)

    Semra Özgümüş

    2015-06-01

    Full Text Available Aim: Brucellosis is an endemic and zoonotic disease in livestock farming areas. Patients may exhibit relapses, reinfections and multi-system complications. Therefore, early diagnosis, appropriate treatment as well as serological follow-up are extremely important in the management of this disease. Methods: We aimed to investigate the demographic characteristics, clinical and laboratory findings and risk factors in 50 brucellosis cases (14 males, 36 females who were treated in Hakkari State Hospital. All patients were evaluated for post-treatment serological results. Results: The mean age of the patients was 35 years. The main clinical symptoms were arthralgia, fatigue, sweating, back pain, and headache. Fever, hepatomegaly, splenomegaly and arthritis were the most common signs. Anemia, high level of AST and ALT, leukopenia, thrombocytopenia, high sedimentation rate, and leukocytosis were found in laboratory tests. The Wright agglutination test was positive at titers of 1/160 in 18 cases, 1/320 in 22 cases, 1/640 in 3 cases, and 1/1280 in 7 cases. Twelve patients had relapse. One patient, who was a veterinarian, was infected via splashing live brucella vaccine into the eyes. Two women transmitted the disease to their babies through breast milk. At the end of the treatment, Wright agglutination test results were negative in all patients. Conclusion: The average duration of symptoms before the diagnosis was 4 months in our study. Therefore, brucellosis should be considered in all individuals who present with fever and arthralgia in endemic areas (The Medical Bulletin of Haseki 2015; 53:139-42

  3. A Facebook Follow-Up Strategy for Rural Drug-Using Women.

    Science.gov (United States)

    Dickson, Megan F; Staton-Tindall, Michele; Smith, Kirsten E; Leukefeld, Carl; Webster, J Matthew; Oser, Carrie B

    2017-06-01

    Facebook (FB) use has grown exponentially over the past decade, including in rural areas. Despite its popularity, FB has been underutilized as a research follow-up approach to maintain contact with research participants and may have advantages in less densely populated areas and among more hard-to-reach, at-risk groups. The overall goal of this study was to examine FB as a supplemental follow-up approach to other follow-up strategies with rural drug-using women. Face-to-face interviews were conducted with randomly selected women who completed baseline interviews in 3 rural jails in 1 state. Analyses focus on participants who were released from jail and were eligible for 3-month follow-up (n = 284). Bivariate analyses were used to examine differences between FB users and nonusers, and multivariate logistic regression models examined predictors of 3-month follow-up participation and being located for follow-up using FB. About two-thirds (64.4%) of participants were regular FB users. Bivariate analyses indicated that FB users were younger, more educated, and more likely to have used alcohol in the 30 days before incarceration but less likely to have a chronic health problem. Regression analyses indicated that rural FB users had more than 5 times the odds of being located for the 3-month follow-up interview, even after controlling for other variables. There were no significant predictors of being followed up using FB. Findings suggest that FB is widely used and well accepted among rural drug-using women. Among hard-to-reach populations, including those in rural, geographically isolated regions, FB serves as a method to improve participant follow-up. © 2016 National Rural Health Association.

  4. Periodic and in-service inspection programs

    International Nuclear Information System (INIS)

    Dinu, M.

    2000-01-01

    Periodic and in-service inspection programs for Cernavoda NPP consists of periodic inspections of CANDU NPP components CSAN N-285.4 and CSAN N-285.4, in-service inspections and repair and modifications general inspection. Periodic inspection program document (PIPD) determines the systems and components subject to inspection, the category of the inspection, techniques, areas and other details.The current status of the inspection programs is presented, including containment , erosion/corrosion, pressure vessel support and snubbers, main steam lines inspection programs. Qualification program in Cernavoda NPP involves equipment qualification in the on-site laboratory, yearly certification, special equipment qualification in the National Institute of Metrology. All procedures are approved by the ISCIR (regulatory body for pressure vessel and lifting equipment) and CNCAN (National Commission on Nuclear Activities Control). Qualification of the personnel is performed according to the ISCIR Technical prescription CR 11/82 for up to 3 year period. Final qualification and licensing is performed by CNCAN

  5. Post-Closure Inspection Report for Corrective Action Unit 453: Area 9 UXO Landfill Tonopah Test Range, Nevada, Calendar Year 2000; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    Post-closure monitoring requirements for the Area 9 Unexploded Ordnance Landfill (Corrective Action Unit[CAU] 453) (Figure 1) are described in Closure Report for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada, report number DOE/NV-284. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 5,1999. The CR (containing the Post-Closure Monitoring Plan) was approved by the NDEP on September 10,1999. Post-closure monitoring at CAU 453 consists of the following: (1) Site inspections done twice a year to evaluate the condition of the unit; (2) Verification that the site is secure; (3) Notice of any subsidence or deficiencies that may compromise the integrity of the unit; (4) Remedy of any deficiencies within 90 days of discovery; and (5) Preparation and submittal of an annual report. Site inspections were conducted on June 20, 2000 and November 21, 2000. Both site inspections were conducted after NDEP approval of the CR, and in accordance with the Post-Closure Monitoring Plan in the NDEP-approved CR. This report includes copies of the inspection checklists, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and inspection photographs are found in Attachment C

  6. Can follow-up controls improve the confidence of MR of the breast? A retrospective analysis of follow-up MR images of the breast

    International Nuclear Information System (INIS)

    Betsch, A.; Arndt, E.; Stern, W.; Claussen, C.D.; Mueller-Schimpfle, M.; Wallwiener, D.

    2001-01-01

    Purpose: To assess the change in diagnostic confidence between first and follow-up dynamic MR examination of the breast (MRM). Methods: The reports of a total of 175 MRM in 77 patients (mean age 50 years; 36-76) with 98 follow-up MRM were analyzed. All examinations were performed as a dynamic study (Gd-DTPA, 0.16 mmol/kg; 6-7 repetitive studies). The change in diagnostic confidence was retrospectively classified as follows: Controlled lesion vanished during follow-up (category I); diagnostic confidence increases during follow-up (II), more likely benign (IIa), more suspicious (IIb); no difference in diagnostic confidence (III). Long-term follow-up over an average of four years was obtained for 57 patients with category IIa/III findings. Results: In 98 follow-up examinations, only two lesions vanished (2%). In 77/98 cases a category IIa lesion was diagnosed, in 11 cases a category IIb lesion. In 8 cases (8%) there was no change in diagnostic confidence during follow-up. Lesions in category IIb underwent biopsy in 10/11 cases, in one case long-term follow-up proved a completely regredient inflammatory change. In 8/11 suspicious findings (IIb) a malignant tumor was detected. The mean time interval between first and follow-up MRM was 8 months for I-IIb lesions, and 4 months for category III lesions. In the longterm follow-up two patients with a category II a lesion developed a carcinoma in a different breast area after four and five years. Conclusion: MRM follow up increases the diagnostic confidence if the time interval is adequate (>4 months). A persistently or increasingly suspicious finding warrants biopsy. (orig.) [de

  7. Towards sustainability assessment follow-up

    Energy Technology Data Exchange (ETDEWEB)

    Morrison-Saunders, Angus, E-mail: a.morrison-saunders@murdoch.edu.au [Murdoch University (Australia); North-West University (South Africa); Pope, Jenny, E-mail: jenny@integral-sustainability.net [North-West University (South Africa); Integral Sustainability (Australia); Curtin University (Australia); Bond, Alan, E-mail: alan.bond@uea.ac.uk [North-West University (South Africa); University of East Anglia (United Kingdom); Retief, Francois, E-mail: francois.retief@nwu.ac.za [North-West University (South Africa)

    2014-02-15

    This paper conceptualises what sustainability assessment follow-up might entail for three models of sustainability assessment: EIA-driven integrated assessment, objectives-led integrated assessment and the contribution to sustainability model. The first two are characterised by proponent monitoring and evaluation of individual impacts and indicators while the latter takes a holistic view based around focused sustainability criteria relevant to the context. The implications of three sustainability challenges on follow-up are also examined: contested time horizons and value changes, trade-offs, and interdisciplinarity. We conclude that in order to meet these challenges some form of adaptive follow-up is necessary and that the contribution to sustainability approach is the best approach. -- Highlights: • We explore sustainability follow-up for three different sustainability models. • Long-time frames require adaptive follow-up and are a key follow-up challenge. • Other key challenges include interdisciplinarity, and trade-offs. • Sustainability follow-up should be a direction of travel and not an outcome. • Only the follow-up for contribution to sustainability model addresses sustainability challenges sufficiently.

  8. Towards sustainability assessment follow-up

    International Nuclear Information System (INIS)

    Morrison-Saunders, Angus; Pope, Jenny; Bond, Alan; Retief, Francois

    2014-01-01

    This paper conceptualises what sustainability assessment follow-up might entail for three models of sustainability assessment: EIA-driven integrated assessment, objectives-led integrated assessment and the contribution to sustainability model. The first two are characterised by proponent monitoring and evaluation of individual impacts and indicators while the latter takes a holistic view based around focused sustainability criteria relevant to the context. The implications of three sustainability challenges on follow-up are also examined: contested time horizons and value changes, trade-offs, and interdisciplinarity. We conclude that in order to meet these challenges some form of adaptive follow-up is necessary and that the contribution to sustainability approach is the best approach. -- Highlights: • We explore sustainability follow-up for three different sustainability models. • Long-time frames require adaptive follow-up and are a key follow-up challenge. • Other key challenges include interdisciplinarity, and trade-offs. • Sustainability follow-up should be a direction of travel and not an outcome. • Only the follow-up for contribution to sustainability model addresses sustainability challenges sufficiently

  9. One-year follow-up of single-visit approach to cervical cancer prevention based on visual inspection with acetic acid wash and immediate cryotherapy in rural Thailand.

    Science.gov (United States)

    Chumworathayi, B; Srisupundit, S; Lumbiganon, P; Limpaphayom, K K

    2008-01-01

    The aim is to evaluate 1) the visibility of cervical squamocolumnar junction (SCJ) after cryotherapy treatment and 2) to evaluate the effectiveness of cryotherapy treatment originally performed as part of a safety, acceptability, and feasibility (SAFE) demonstration project evaluating the SAFE of visual inspection with acetic acid (VIA) followed by immediate offer of cryotherapy among those who were tested positive and eligible for treatment. A total of 704 women presented at 1-year follow-up exam during which VIA was performed again by nurses. Six hundred and forty eight (92.0%) women received colposcopy and any kind of biopsy, if indicated, by trained physician colposcopists at a referral hospital. At 1 year, VIA nurses assessed 42 of 648 referred women (6.5%) as abnormal (test positive or suspected cancer). The SCJ was visible to the colposcopists in 91.7% (594/648) of the women. Among 42 women assessed as abnormal by the nurses, colposcopic findings were abnormal in 83.3% (35/42), with one low-grade squamous intraepithelial lesion, two high-grade squamous intraepithelial lesion (HSIL), and one adenocarcinoma confirmed later by biopsy. Among 606 VIA negative women, colposcopy was abnormal in only 23.4% (142/606), with two cases of HSIL confirmed later. Given that the SCJ was visible in the vast majority of women (91.7%) after cryotherapy, VIA could be used to provide follow-up for women previously treated. The disease negative rate after cryotherapy (no human papillomavirus infection, no cervical intraepithelial neoplasia, and no cancer) at 1 year after treatment was 85.5% (554/648).

  10. Loss to Follow-Up: Issues and Recommendations

    Science.gov (United States)

    Hoffman, Jeff; Munoz, Karen F.; Bradham, Tamala S.; Nelson, Lauri

    2011-01-01

    State coordinators of early hearing detection and intervention (EHDI) programs completed a strengths, weaknesses, opportunities, and threats, or SWOT, analysis that examined 12 areas within state EHDI programs. Related to how EHDI programs address loss to follow-up, 47 coordinators responded with 277 items, and themes were identified in each…

  11. Fusiform-shaped nodules along the internal carotid artery demonstrated by follow-up sonography within the dissected neck area in patients with oral cancer

    International Nuclear Information System (INIS)

    Hayashi, Takafumi; Katsura, Kouji; Taira, Shuhzou; Shingaki, Susumu; Hoshina, Hideyuki

    2004-01-01

    In order to distinguish benign from malignant nodules within the dissected neck area in patients with oral cancer during the follow-up period, we retrospectively evaluated the frequency and characteristic findings of fusiform-shaped nodules along the internal carotid artery observed by follow-up sonography. From 1997 to 2003, 52 patients with oral cancer, who underwent radical neck dissections, were enrolled in this study. The study cohort consisted of 33 males and 19 females ranging in age from 29 to 84 years (mean, 62.0 years). After neck dissection, every patient was examined repeatedly with sonography during the follow-up period at an interval of one month. CT and/or MRI were performed when clinically required. Any patient with recurrent neck mass was excluded from this study. In the 52 patients, fusiform-shaped nodules were observed in 10 patients (19%) by the follow-up sonography. The nodules were homogenously hypoechoic and the margin was well-demarcated except for the upper end. A hyperechoic core was clearly observed in every nodule, which showed a fatty density on post-contrast CT. On post-contrast MRI, the nodules enhanced markedly and the core showed hypointensity on fat saturated images. In conclusion, it was suggested that the fusiform-shaped nodules observed by follow-up sonography within the dissected neck area might be the superior cervical ganglion of sympathetic trunk. However, further studies are needed to disclose the true character of the nodules. (author)

  12. Processing ultrasonic inspection data from multiple scan patterns for turbine rotor weld build-up evaluations

    Science.gov (United States)

    Guan, Xuefei; Rasselkorde, El Mahjoub; Abbasi, Waheed; Zhou, S. Kevin

    2015-03-01

    The study presents a data processing methodology for weld build-up using multiple scan patterns. To achieve an overall high probability of detection for flaws with different orientations, an inspection procedure with three different scan patterns is proposed. The three scan patterns are radial-tangential longitude wave pattern, axial-radial longitude wave pattern, and tangential shear wave pattern. Scientific fusion of the inspection data is implemented using volume reconstruction techniques. The idea is to perform spatial domain forward data mapping for all sampling points. A conservative scheme is employed to handle the case that multiple sampling points are mapped to one grid location. The scheme assigns the maximum value for the grid location to retain the largest equivalent reflector size for the location. The methodology is demonstrated and validated using a realistic ring of weld build-up. Tungsten balls and bars are embedded to the weld build-up during manufacturing process to represent natural flaws. Flat bottomed holes and side drilled holes are installed as artificial flaws. Automatic flaw identification and extraction are demonstrated. Results indicate the inspection procedure with multiple scan patterns can identify all the artificial and natural flaws.

  13. Inspection of Emergency Arrangements

    International Nuclear Information System (INIS)

    2013-01-01

    The Working Group on Inspection Practices (WGIP) was tasked by the NEA CNRA to examine and evaluate the extent to which emergency arrangements are inspected and to identify areas of importance for the development of good inspection practices. WGIP members shared their approaches to the inspection of emergency arrangements by the use of questionnaires, which were developed from the requirements set out in IAEA Safety Standards. Detailed responses to the questionnaires from WGIP member countries have been compiled and are presented in the appendix to this report. The following commendable practices have been drawn from the completed questionnaires and views provided by WGIP members: - RBs and their Inspectors have sufficient knowledge and information regarding operator's arrangements for the preparedness and response to nuclear emergencies, to enable authoritative advice to be given to the national coordinating authority, where necessary. - Inspectors check that the operator's response to a nuclear emergency is adequately integrated with relevant response organisations. - Inspectors pay attention to consider the integration of the operator's response to safety and security threats. - The efficiency of international relations is checked in depth during some exercises (e.g. early warning, assistance and technical information), especially for near-border facilities that could lead to an emergency response abroad. - RB inspection programmes consider the adequacy of arrangements for emergency preparedness and response to multi-unit accidents. - RBs assess the adequacy of arrangements to respond to accidents in other countries. - The RB's role is adequately documented and communicated to all agencies taking part in the response to a nuclear or radiological emergency. - Inspectors check that threat assessments for NPPs have been undertaken in accordance with national requirements and that up-to-date assessments have been used as the basis for developing emergency plans for

  14. A portable solution to enable guided ultrasonic inspection

    International Nuclear Information System (INIS)

    Enenkel, Laurent; Buechler, Johannes; Poirier, Jerome; Jervis David

    2012-01-01

    This paper describes the development and application of an innovative ultrasonic (UT) inspection system, which is 100% guided and menu-driven to reduce human error and ensure both inspection accuracy and productivity in the reliable and accurate non-destructive testing (NDT) of shafts, tubes, pipes, and other components and structures. Set-up is menu-directed with the minimum of instrument-specific training, allowing the integral operating software to calculate all the ultrasonic parameters for each task according to the inspection procedure and create an easy-to-follow inspection plan, using either phased array or conventional UT. The operator then scans the work piece, with an encoded scanner, which ensures that the inspection plan is strictly followed. Inspection data is transmitted to a review station in the industry-accepted, non-proprietary DICONDE protocol, allowing advanced analysis tools, such as real time, volume corrected imaging, to allow easier and more reliable image interpretation. By using GEs Rhythm software platform, inspection data can be reviewed and shared, reports generated and inspection results archived for traceability, tracking or further analysis.

  15. A locomotive inspection robot for turbine building interior inspection in nuclear power plants

    International Nuclear Information System (INIS)

    Obama, M.; Ozaki, F.; Asano, K.

    1985-01-01

    A locomotive inspection robot, named Turbine Building Inspection System (TBIS), has been developed for turbine building interior inspections in nuclear power plants. This robot is made up of a vehicle, a telescopic support, turning head and a multijoint arm which has dual TV cameras and a diagnostic rod on its tip. The multijoint arm has 17 degrees of freedom and its length is 243 cm. Minimum and maximum heights for the multijoint arm shoulder are 1.5 meter and 4 meters respectively. The total degree of freedom in the combination of the multijoint arm, turning head and telescopic support is 19 and the area, it is capable of inspecting, is equal to the cylindrical dome whose height and diameter are 6.4 meters and 4.8 meters respectively. The design philosophy, hardware structure and operation method of the TBIS are described. 2 refs.; 10 figs

  16. Follow-up of a road building scheme in a fragile environment

    International Nuclear Information System (INIS)

    Gallardo, Amarilis Lucia Casteli Figueiredo; Sanchez, Luis E.

    2004-01-01

    Serra do Mar, in Southeastern Brazil, is an extremely diverse and rich environment characterized by intense rainfall and steep slopes covered by tropical rainforest. A number of roads, highways, railways, pipelines, and transmission lines cross this zone. A new highway that has been approved by the Sao Paulo State environment authorities is currently under construction. During the approval phase, the issue of ensuring proper implementation of mitigation measures arose as a significant concern. As a consequence, an innovative institutional arrangement has been set up for following-up, by which a multi-institutional multidisciplinary team performs weekly inspection tours, whereas the project owner hired its own consultant to oversee the construction, putting the contractor under strict scrutiny. Among the most significant issues addressed, the following are particularly relevant: (1) erosion and sediment yield; (2) river siltation; (3) slope stability; (4) excavated soil and rock disposal; (5) management of water pumped from tunneling; and (6) minimizing habitat loss. Results show that strict environmental supervision can effectively ensure that environmental impacts can be maintained within the limits of predicted impacts or legal requirements. Furthermore, this case showed that careful review of environmental impact studies and the establishment of detailed terms and conditions to be fulfilled by the proponent during the construction phase are necessary conditions for a successful follow-up

  17. OSE inspection of protection program operations field perspective of inspections

    International Nuclear Information System (INIS)

    Brown, R.W.; Martin, H.R.

    1987-01-01

    Protection Program Operations includes three functional areas: Physical Protection Systems, Protective Forces, and System Performance Testing. The Office of Security Evaluations (OSE) inspects field offices in these areas by evaluating programs relative to Standards and Criteria and by performing a variety of exercises and other types of tests to assure protective systems are effective and maintained at a proper level to meet the defined threat. Their perception of the OSE inspections has been positive. The approach taken by ID, with key areas/activities emphasized, during each phase of the field inspection process is described in this report. The most important areas for field offices to concentrate are: inspection preparations through self-evaluation, improving communications, assigning knowledgeable trusted agents, increasing awareness of facility procedures and operations, and assuring daily validations of inspected areas. Emphasis is placed on striving for a balance in reporting both positive and negative findings, and for consistency between ratings and the importance of report findings. OSE efforts to develop improved rating methodologies are encouraged

  18. GCP inspections in Germany and Europe following the implementation of the Directive 2001/20/EC

    Directory of Open Access Journals (Sweden)

    Hundt, Ferdinand

    2009-03-01

    Full Text Available Background: The implementation of the Clinical Trials Directive 2001/20/EC and the Good Clinical Practice Directive 2005/28/EC fundamentally restructured and harmonized the conduct of clinical trials in Europe. GCP inspections – which affect study sites, laboratories, sponsors and contract research organizations (CRO alike – make up an important part of these regulations. A common understanding of how these regulations apply in daily life is however not always ensured. Methods: A working group of the Clinical Research/Quality Assurance subcommittee of the German Association of Research-Based Pharmaceutical Companies (VFA was established to outline the regulatory requirements, the experience gathered with inspections by means of a survey and to set up guidance on how to manage an inspection. Results and conclusions: The survey, conducted with the help of 15 pharmaceutical companies within the VFA, included a total of 224 inspections (74 inspections in Germany, 150 from other European countries. Most frequent findings in and outside Germany were related to “documentation” (40.5% vs. 21.3%, “investigational new drugs” (16.2% vs. 14.7%, “drug safety” (13.5% vs. 8% and “application for a clinical trial authorization” (5.4% vs. 12%. From a German perspective, key findings of this working group were the necessity for a clear differentiation of responsibilities between national and federal as well as international authorities, a harmonization of inspection procedures and topics, and a clarification of whether pre-study/on-study and pre-approval/post-approval GCP inspections of the federal higher authority are included in the “Zentralstelle der Länder für Gesundheitsschutz bei Arzneimitteln und Medizinprodukten” (ZLG requirements. The survey illustrated, that inspections usually are conducted at the investigational site, and that most of the findings are well known and thus could be prevented by communicating and discussing

  19. Visual inspection technology of the narrow and small confined area for monitoring feederpipe support of pressure tube in calandria reactor

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Jae Wan; Lee, Nam Ho; Choi, Young Soo [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-12-01

    There are 760 feederpipes, which they are connected to inlet/outlet of the 380 pressure tube channels on the front of the calandria, in CANDU-type Reactor of Wolsung Nuclear Power Plant. As an ISI(In-Service Inspection) and PSI (Post-Service Inspection) requirements, maintenance activities of measuring the thickness of curvilinear part of feederpipe and inspecting the feederpipe support area within calandria are needed to ensure continued reliable operation of nuclear power plant. And ultrasonic probe is used to measure the thickness of curvilinear part of feederpipe, however workers are exposed to radioactivity irradiation during the measurement period. But, it is exposed to radioactivity irradiation during the measurement period. But, it is impossible to inspect feederpipe support area thoroughly because of narrow and confined accessibility, that is , an inspection space between the pressure tube channels is less than 100 mm and pipes in feederpipe support area are congested. And also, workers involved in inspecting feederpipe support area are under the jeopardy of high-level radiation exposure. Concerns about sliding home, which make the move of feederpipe connected to pressure tube channel smooth as pressure tube expands and contracts in its axial direction, stuck to feedeerpipe support and some of the structural components have made necessary the development of video inspection probe system with narrow and confined accessibility to observe and inspect feederpipe support area more close. Using video inspection probe system, it is possible to inspect and repair abnormality of feederpipe support connected to pressure tube channels of the calandria more accurate and quantative than naked eye. Therefore, that will do much for ensuring safety of CANDU-type nuclear power plant. 45 figs.,31 tabs. (Author)

  20. Paraquat induced lung injury: long-term follow-up of HRCT

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Tong; Kim, Hyun Cheol; Bae, Won Kyung; Kim, Il Young; Im, Han Hyek [Soonchunhyang Univ., Chunan (Korea, Republic of)

    2004-03-01

    To determine the long-term follow-up CT findings of paraquat-induced lung injury. Six patients who ingested paraquat underwent sequential follow-up CT scanning during a period of at least six months, and the results were analysed. Scans were obtained 1-6 (mean, 3.3) time during a 7-84 (mean, 25.7) months period, and the findings at 1-2 months, 3-12 months, 1-2 years, 2-3 years and more than above 7 years after poisoning were analyzed. We observed irregular-shaped areas of consolidation with traction bronchiectasis at 1-2 months (5/5), irregular-shaped consolidation and ground-glass opacity (5/5) at 3-12 months, and irregular-shaped consolidations/ground-glass opacity (4/5) and focal honeycombing (1/5) one year later. In the same patients, follow-up CT scans showed that some areas of focal consolidation could not be visualized and the radio-opacity of the lesions had decreased. The HRCT findings of paraquat-induced lung injury were irregular shaped areas of consolidation 1-2 months after ingestion, and irregular-shaped consolidation and ground-glass opacity or focal honeycombing 3-12 months later. At this thim slight improvement was observed.

  1. Quantification, validation, and follow-up of small bowel motility in Crohn's disease

    Science.gov (United States)

    Cerrolaza, Juan J.; Peng, Jennifer Q.; Safdar, Nabile M.; Conklin, Laurie; Sze, Raymond; Linguraru, Marius George

    2015-03-01

    The use of magnetic resonance enterography (MRE) has become a mainstay in the evaluation, assessment and follow up of inflammatory bowel diseases, such as Crohn's disease (CD), thanks to its high image quality and its non-ionizing nature. In particular, the advent of faster MRE sequences less sensitive to image-motion artifacts offers the possibility to obtain visual, structural and functional information of the patient's small bowel. However, the inherent subjectivity of the mere visual inspection of these images often hinders the accurate identification and monitoring of the pathological areas. In this paper, we present a framework that provides quantitative and objective motility information of the small bowel from free-breathing MRE dynamic sequences. After compensating for the breathing motion of the patient, we create personalized peristaltic activity maps via optical flow analysis. The result is the creation of a new set of images providing objective and precise functional information of the small bowel. The accuracy of the new method was also evaluated from two different perspectives: objective accuracy (1.1 ± 0.6 mm/s of error), i.e., the ability of the system to provide quantitative and accurate information about the motility of moving bowel landmarks, and subjective accuracy (avg. difference of 0.7 ± 0.7 in a range of 1 to 5), i.e., the degree of agreement with the subjective evaluation of an expert. Finally, the practical utility of the new method was successfully evaluated in a preliminary study with 32 studies of healthy and CD cases, showing its potential for the fast and accurate assessment and follow up of CD in the small bowel.

  2. New Swedish regulations in the area of plant inspection and in-service inspection

    International Nuclear Information System (INIS)

    Hansson, B.

    1998-01-01

    History and present status od Swedish regulations in the field of NPP inspection and in-service inspection are described. The presentation focuses on the development of regulations and establishing new ones. A description of different organisations involved is included

  3. IRSN-ANCCLI partnership. IRSN-ANCCLI seminar on decennial inspections of 900 MWe reactors - November 2010

    International Nuclear Information System (INIS)

    Rollinger, Francois; Delalonde, Jean-Claude; Hubert, F.; Paulmaz, X.; Tindillere, M.; Lheureux, Y.; Junker, R.; Sene, M.

    2010-11-01

    This seminar addressed the commitment of local information commissions (CLI) in the analysis and follow-up of the third decennial inspections of the French 900 MWe nuclear reactors. A first session addressed topics directly related to these inspections. Contributions proposed under the form of Power Point presentations by experts and representatives of the IRSN, EDF and CLIs addressed the following issues: safety re-examination of EDF 900 MWe reactors at the occasion of the third decennial inspection, activities of the IRSN related to skill management in nuclear power stations, implementation of the third decennial inspection of the unit 1 of the Fessenheim nuclear power station, the issue of follow-up by a local information commission after a decennial inspection. A second session addressed topics not related to decennial inspections and were proposed by Gravelines and Dampierre local information commissions: analysis of significant safety events, issues of skill management in nuclear power stations

  4. Inspection planning

    International Nuclear Information System (INIS)

    Korosec, D.; Levstek, M.F.

    2001-01-01

    Slovenian Nuclear Safety Administration (SNSA) division of nuclear and radiological safety inspection has developed systematic approach to their inspections. To be efficient in their efforts regarding regular and other types of inspections, in past years, the inspection plan has been developed. It is yearly based and organized on a such systematic way, that all areas of nuclear safety important activities of the licensee are covered. The inspection plan assures appropriate preparation for conducting the inspections, allows the overview of the progress regarding the areas to be covered during the year. Depending on the licensee activities and nature of facility (nuclear power plant, research reactor, radioactive waste storage, others), the plan has different levels of intensity of inspections and also their frequency. One of the basic approaches of the plan is to cover all nuclear and radiological important activities on such way, that all regulatory requests are fulfilled. In addition, the inspection plan is a good tool to improve inspection effectiveness based on previous experience and allows to have the oversight of the current status of fulfillment of planned inspections. Future improvement of the plan is necessary in the light of newest achievements on this field in the nuclear world, that means, new types of inspections are planned and will be incorporated into plan in next year.(author)

  5. Producing the Docile Body: Analysing Local Area Under-Performance Inspection (LAUI)

    Science.gov (United States)

    Clapham, Andrew

    2015-01-01

    Sir Michael Wilshaw, the head of the Office for Standards in Education (OfSTED), declared a "new wave" of Local Area Under-performance Inspections (LAUI) of schools "denying children the standard of education they deserve". This paper examines how the threat of LAUI played out over three mathematics lessons taught by a teacher…

  6. Focussed probes ultrasonic follow-up of actual flaw growth during fatigue testing

    International Nuclear Information System (INIS)

    Cinotti, C.; Dufresne, J.; Prot, A.C.; Touffait, A.M.; Saglio, R.

    1979-01-01

    A programme was undertaken to follow-up the growth of actual flaws purposely introduced during the welding process of five test specimens. The aim of this programme is to measure the actual size of the cracks which develop from the known defects during the fatigue testing. The sizing method is based on the use of focussed probes, which allow good accuracy and repeatability, as well as good sensitivity. Examples are given of the first results: sizing before testing, then step by step during the fatigue testing and also under compression. This last point is very important in view of the ultrasonic testing during periodic in-service inspection

  7. Full surface inspection methods regarding reinforcement corrosion of concrete structures

    International Nuclear Information System (INIS)

    Reichling, K.; Raupach, M.; Broomfield, J.; Gulikers, J.; L'Hostis, Valerie

    2013-01-01

    For reinforced concrete structures a localisation of all significant critical areas can only be done by a full surface inspection. The economic advantages are obvious: uncritical areas have not to be repaired expensively.The first step of the assessment should always be a visual inspection. The range of deterioration causes can be limited and the degree of deterioration may be estimated roughly. The inspection program can be adjusted to the requirements. By means of a full surface potential mapping areas with a high risk for chloride induced reinforcement corrosion can be localised, although no deteriorations are visually detectable at the concrete surface. In combination with concrete cover depth and resistivity measurements areas with corrosion promoting exposure conditions can be localised even if the reinforcement is not yet de-passivated. The following publication gives an overview about the essential full surface investigation methods to localise critical areas regarding corrosion of steel in concrete. The selection of methods is based on the inspection procedure given in reference 2. (authors)

  8. Assembly-line health check up in digitalized hospital.

    Science.gov (United States)

    Liu, Yalan; Yao, Bin; Zhang, Zigang

    2002-01-01

    The health check up flow of digital hospital can be consulted with the assembly line of industry factory. Because they have the following same features: highly specialized workstation, closeness and continuance, rhythm, balanced production, continuous production. The essential prerequisites are as the follows: The inspecting items and methods should be stable; advanced product mix and stable production design; standardized raw material, consumption, procedure, inspection method; there are lots of request for health inspection; the customers move at the least unit; the space arrangement should be reasonable; the time arrangement should be proportion. With the computer net, the digital inspection can achieves the raw material controlling accurately. The basis of check up line concerns about equipment, net and software, data collection, and personnel. The group technology is used in the health inspection flow design of the digital hospital in the field of items customers and zone redivided. The digital assembly linemic health inspect has the following stages: member registering, notice, check in, arrange order, time control, report, feedback and analysis. The assembly linemic has following advantages: increasing the productivity, the space utility, satisfaction of customer, fund returning, lowering the cost and ensuring the quality.

  9. Inspection of training activities by the NRC's Office of Inspection and Enforcement

    International Nuclear Information System (INIS)

    Ruhlman, W.A.

    1975-01-01

    New requirements in the Code of Federal Regulations, the issuance of new Regulatory Guides and ANSI Standards, have indicated the increased emphasis being placed on training by forces in the Nuclear Industry and the Nuclear Regulatory Commission. A brief description is presented of the functions of the Office of Inspection and Enforcement in the training areas. Three areas are examined: general inspection techniques; training inspection scope; and training inspection bases

  10. Autonomous navigation system for mobile robots of inspection

    International Nuclear Information System (INIS)

    Angulo S, P.; Segovia de los Rios, A.

    2005-01-01

    One of the goals in robotics is the human personnel's protection that work in dangerous areas or of difficult access, such it is the case of the nuclear industry where exist areas that, for their own nature, they are inaccessible for the human personnel, such as areas with high radiation level or high temperatures; it is in these cases where it is indispensable the use of an inspection system that is able to carry out a sampling of the area in order to determine if this areas can be accessible for the human personnel. In this situation it is possible to use an inspection system based on a mobile robot, of preference of autonomous navigation, for the realization of such inspection avoiding by this way the human personnel's exposure. The present work proposes a model of autonomous navigation for a mobile robot Pioneer 2-D Xe based on the algorithm of wall following using the paradigm of fuzzy logic. (Author)

  11. Nurse-Led Telephone Follow-up: Improving Options for Women With Endometrial Cancer

    NARCIS (Netherlands)

    Smits, A.; Lopes, A.; Das, N.; Bekkers, R.L.M.; Kent, E.; McCullough, Z.; Galaal, K.

    2015-01-01

    BACKGROUND: Nurse-led follow-up (NLFU) has been identified as a suitable means of follow-up care in cancer patients, and its acceptability has already been demonstrated in other areas of cancer care. OBJECTIVES: The objectives of this study were to evaluate the effect of NLFU on quality of life and

  12. Remote-Controlled Inspection Robot for Nuclear Facilities in Underwater Environment

    International Nuclear Information System (INIS)

    Yasuhiro Miwa; Syuichi Satoh; Naoya Hirose

    2002-01-01

    A remote-controlled inspection robot for nuclear facilities was developed. This is a underwater robot technology combined with inspection and flaw removal technologies. This report will describe the structure and performance of this robot. The inspection robot consists of two parts. The one is driving equipment, and the other is inspection and grinding units. It can swim in the tank, move around the tank wall, and stay on the inspection area. After that it starts inspection and flaw removal with a special grinding wheel. This technology had been developed to inspect some Radioactive Waste (RW) tanks in operating nuclear power plants. There are many RW tanks in these plants, which human workers can be hard to access because of a high level dose. This technology is too useful for inspection works of human-inaccessible areas. And also, in conventional inspection process, some worker go into the tank and set up scaffolding after full drainage and decontamination. It spends too much time for these preparations. If tank inspection and flaw removal can be performed in underwater, the outage period will be reduced. Remote-controlled process can be performed in underwater. This is the great advantage for plant owners. Since 1999 we have been applying this inspection robot to operating nuclear 11 facilities in Japan. (authors)

  13. Development and performance of inspection equipment for pressure tubes in Fugen

    International Nuclear Information System (INIS)

    Naruo, Kazuteru; Tanimoto, Ken-ichi; Ohta, Takeo; Nakamura, Takahisa; Imaizumi, Kiyoshi.

    1984-01-01

    The pressure tubes of Fugen are the important equipment as the many tubes compose the core, and since they are made of Zr-2.5% Nb alloy which has been used for the first time in Japan, they have become the object of monitoring (the follow-up investigation of the change of inside diameter, the presence of defects and so on) in addition to the in-service inspection. In this paper, on the inspection equipment for pressure tubes, that has been developed independently by the Power Reactor and Nuclear Fuel Development Corp. in order to carry out the ISI and monitoring, the course of development and the construction and the performance are reported, and the results of having used it for the fourth regular inspection of Fugen are described. The 10-year plan of the ISI and monitoring of pressure tubes is shown. The core of Fugen is composed of 224 pressure tubes, therefore, the inspection is carried out by sampling inspection. The monitoring is carried out on four tubes for the follow-up investigation and one tube that shows the severest operation history at the time of inspection. The equipment performs ultrasonic flaw detection, the measurement of inside diameter and the visual inspection of internal surface. (Kako, I.)

  14. Joint inspection of services for people with learning disabilities in Scotland: compliance or commitment?

    Directory of Open Access Journals (Sweden)

    Martin Campbell

    2006-10-01

    Full Text Available Purpose: The article describes the development of a practical model of joint, integrated inspection of managed care services for people with learning disabilities in Scotland. The model will give a reliable measure of the impact services are making to people's lives and the quality of service that individuals are actually receiving. Context of case: At present health, social services and education services for people with learning disabilities in Scotland are inspected separately, by up to nine different agencies. The first joint, integrated inspections of all services for people with learning disabilities in Scotland will take place in 2006. This is the first inspection of its kind in the UK, and the first to involve carers and people with learning disabilities on the inspection team. Data sources: Quality Outcome Indicators were developed in 21 different areas, or domains. Evidence based best practice, and evaluative data from previous inspections were the primary sources of data. Case description: This paper reviews the background and rationale for the integrated, joint inspection process. Strengths and constraints of this approach to inspection are discussed, including the crucial importance of commitment from services and from inspectors, rather than mere compliance with demands. Some guidance on how to fully involve staff, carers and services users in the inspection process is given. Conclusions and discussion: The model will produce data to inform decision-making for managers in integrated services and give services users clear information about how well local needs are being met, what areas need development, and what capacity the organisations have to improve. The model of inspection may be of interest to practitioners in a national and international context. The model will be evaluated, following the first joint inspection.

  15. CONTRACT FOLLOW UP TRAINING

    CERN Multimedia

    Technical Training; Tel. 74460

    2001-01-01

    SPL is organizing Training Sessions on the Contract Follow Up application. CFU is a Web based tool, developped and supported by the Administrative Information Services. It allows the creation of Divisional Requests and the follow up of their processing, from the Market Survey to the Invitation to Tender or Price Enquiry, approval by the Finance Committee, up to the actual signature of a Contract, acccording to the CERN Purchasing procedures. It includes a document management component. It also provides link with other AIS applications such as BHT and EDH. The course is primarily intended for DPOs, Contract Technical responsibles in the division and their assistants, but is beneficial to anybody involved in the follow up of such Purchasing Procedures. This course is free of charge, but application is necessary. The details of the course may be found at http://training.web.cern.ch/Training/ENSTEC/P2001/Bureautique/cfu4_f.htm General information of CFU may be found at http://ais.cern.ch/apps/cfu/ The dates of t...

  16. Pipelines inspection robots; Robos para inspecao de linhas de servico

    Energy Technology Data Exchange (ETDEWEB)

    Archila Diaz, John Faber; Dutra, Max Suell [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Lab. de Robotica

    2008-07-01

    One of the problems existing in the area of maintenance of systems for the transport of mass and / or energy is to examine the integrity of the lines of service in the basic infrastructure of cities and industries. For the development of maintenance, whether predictive, preventive or corrective is necessary to conduct the inspection of these lines. To carry out this task is necessary count on help of appropriate technological tools. The main tools for inspection of service lines come from the area of external inspection of pipelines and are also in development, the problem happens when we need to achieve internal or external failures in places of difficult access, and move the inspection equipment to places where it's going to fail. In these cases it is necessary to the use of mechatronic systems, more specifically robotic systems, which may be developed for inspection. This paper aims to present the main robotic systems used for inspection, especially for internal inspection of pipelines. These systems have been developed by the research groups in Brazil, Japan, and Belgium among others, giving up a classification of robots for inspection of pipelines and the main features necessary for its project. (author)

  17. Pipelines inspection robots; Robos para inspecao de linhas de servico

    Energy Technology Data Exchange (ETDEWEB)

    Archila Diaz, John Faber; Dutra, Max Suell [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Lab. de Robotica

    2008-07-01

    One of the problems existing in the area of maintenance of systems for the transport of mass and / or energy is to examine the integrity of the lines of service in the basic infrastructure of cities and industries. For the development of maintenance, whether predictive, preventive or corrective is necessary to conduct the inspection of these lines. To carry out this task is necessary count on help of appropriate technological tools. The main tools for inspection of service lines come from the area of external inspection of pipelines and are also in development, the problem happens when we need to achieve internal or external failures in places of difficult access, and move the inspection equipment to places where it's going to fail. In these cases it is necessary to the use of mechatronic systems, more specifically robotic systems, which may be developed for inspection. This paper aims to present the main robotic systems used for inspection, especially for internal inspection of pipelines. These systems have been developed by the research groups in Brazil, Japan, and Belgium among others, giving up a classification of robots for inspection of pipelines and the main features necessary for its project. (author)

  18. Follow-up of colorectal cancer patients: quality of life and attitudes towards follow-up

    NARCIS (Netherlands)

    Stiggelbout, A. M.; de Haes, J. C.; Vree, R.; van de Velde, C. J.; Bruijninckx, C. M.; van Groningen, K.; Kievit, J.

    1997-01-01

    The aims of our study were to assess the effect of follow-up on the quality of life of colorectal cancer patients and to assess the attitudes of patients towards follow-up as a function of patient characteristics. Patients who had been treated with curative intent were selected from four types of

  19. Post-Closure Inspection Report for Corrective Action Unit 424: Area 3 Landfill Complexes Tonopah Test Range, Nevada Calendar Year 2001; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2002-01-01

    Corrective Action Unit (CAU) 424, the Area 3 Landfill Complexes at Tonopah Test Range, consists of eight Corrective Action Sites (CASs), seven of which are landfill cells that were closed previously by capping. (The eighth CAS, A3-7, was not used as a landfill site and was closed without taking any corrective action.) Figure 1 shows the general location of the landfill cells. Figure 2 shows in more detail the location of the eight landfill cells. CAU 424 closure activities included removing small volumes of soil containing petroleum hydrocarbons, repairing cell covers that were cracked or had subsided, and installing above-grade and at-grade monuments marking the comers of the landfill cells. Post-closure monitoring requirements for CAU 424 are detailed in Section 5.0, Post-Closure Inspection Plan, contained in the Closure Report for Corrective Action Unit 424: Area 3 Landfill Complexes, Tonopah Test Range, Nevada, report number DOE/NV-283, July 1999. The Closure Report (CR) was approved by the Nevada Division of Environmental Protection (NDEP) in July 1999. The CR includes compaction and permeability results of soils that cap the seven landfill cells. As stated in Section 5.0 of the NDEP-approved CR, post-closure monitoring at CAU 424 consists of the following: (1) Site inspections conducted twice a year to evaluate the condition of the unit. (2) Verification that landfill markers and warning signs are in-place, intact, and readable. (3) Notice of any subsidence, erosion, unauthorized use, or deficiencies that may compromise the integrity of the landfill covers. (4) Remedy of any deficiencies within 90 days of discovery. (5) Preparation and submittal of an annual report. Site inspections were conducted on May 16, 2001, and November 6, 2001. The inspections were preformed after the NDEP approval of the CR. This report includes copies of the inspection checklist, photographs, recommendations, and conclusions. The Post-Closure Inspection Checklists are found in

  20. Microbial water quality in clean water tanks following inspection and cleaning

    DEFF Research Database (Denmark)

    Christensen, Sarah Christine Boesgaard; Esbjørn, Anne; Mollerup, Finn

    Increased bacterial counts are often registered in drinking water leaving clean water tanks after the tanks have been emptied, inspected and cleaned by flushing. To investigate the reason for the increased bacterial concentrations and consequently limit it, samples from two clean water tanks befo...... start-up of the tanks, which may indicate that a substantial part of the bacteria in the drinking water leaving the tanks originated from the sand filter. This was supported by 16S DNA analyses....

  1. Follow-up after rectal cancer

    DEFF Research Database (Denmark)

    Hovdenak Jakobsen, Ida; Juul, Therese; Bernstein, Inge

    2017-01-01

    BACKGROUND: The main treatment for non-metastatic rectal cancer (RC) is surgical resection. Late adverse effects that are highly prevalent and negatively impact patients' symptom burden and quality of life are: bowel-, urological and sexual dysfunctions; psychological distress; fear of recurrence....... As a consequence, the randomized controlled trial Follow-up after Rectal Cancer (FURCA) has been launched, testing the effect of a new patient-led, follow-up program. The aim of this paper is to describe the methodology used in the FURCA study and to report results from the development of the patient-led, follow......, or a control group following the current follow-up program with routine medicals. The primary outcomes are symptom burden and quality of life, measured by the Functional Assessment of Cancer Therapy - Colorectal (FACT-C) questionnaire. Other outcome and demographic data are collected as patient...

  2. Experts Complete IAEA Follow-up Review of Spanish Nuclear Regulatory Authority

    International Nuclear Information System (INIS)

    2011-01-01

    areas of inspection and public communication as a consequence of the lessons learned in 2008 from the event at the Asco Nuclear Power Plant; CSN's interactions at the highest level with licensees to discuss strategic planning and their investments in safety and human resources; and The establishment of formal frameworks for cooperation between the CSN and several governmental organizations, such as the Ministry of Health and the Ministry of Interior in the areas of radiation protection and security. Carmen Martinez Ten, President of CSN, said, 'I am proud that Spain is among the first countries to have received a full- scope IRRS mission and a follow-up. CSN has benefitted from the IRRS mission using the contribution from senior regulators which has resulted and will continue in further improvements in our regulatory framework.' The IRRS team also made recommendations and suggestions to further strengthen Spain's regulatory body, including: CSN should establish a formal policy on how to use technical advisory bodies for technical regulatory decisions; CSN should continue to work with relevant bodies to prepare for the disposal of spent fuel and high-level waste, taking into account the progress being made in the siting of a storage facility; and CSN should continue to work with relevant competent authorities and other bodies on regulatory aspects of security. Denis Flory, IAEA Deputy Director General for Nuclear Safety and Security, said, 'This mission is a clear example of the value of regulatory bodies participating in a senior peer review process offered by IAEA. A particularly important feature of these IRRS follow-up missions is to assess the effective implementation of the recommendations made. This mission to Spain also demonstrates clearly the mutual interest of IRRS missions: they encourage improvements in the host countries and serve as valuable sources of information for the reviewers themselves and for other regulatory bodies.' (IAEA)

  3. Occupational disease disclosed by preventive follow-up of former uranium ore miners

    International Nuclear Information System (INIS)

    Pacina, V.; Vich, Z.; Elterlein, E.

    1982-01-01

    The aim of preventive follow-up examinations of former employees of the concern Czechoslovak Uranium Mines is to determine possible health damage of chronically exposed workers in an area that can become manifest even following a long time after leaving the high-risk working environment. In a group of 1,139 persons that had undergone preventive follow-up examinations in the years 1977 to 1980 there were 63 cases of newly detected affections that were reported as occupational diseases, and other serious affections. The system of preventive follow-up examinations represents a significant contribution to the improvement of health care of the workers. (author)

  4. Follow-up in Childhood Functional Constipation

    DEFF Research Database (Denmark)

    Modin, Line; Walsted, Anne-Mette; Rittig, Charlotte Siggaard

    2016-01-01

    OBJECTIVES: Guidelines recommend close follow-up during treatment of childhood functional constipation. Only sparse evidence exists on how follow-up is best implemented. Our aim was to evaluate if follow-up by phone or self-management through web-based information improved treatment outcomes....... METHODS: In this randomized, controlled trial, conducted in secondary care, 235 children, aged 2-16 years, who fulfilled the Rome III criteria of childhood constipation, were assigned to one of three follow-up regimens: (I) control group (no scheduled contact), (II) phone group (2 scheduled phone contacts......: Improved self-management behavior caused by access to self-motivated web-based information induced faster short-term recovery during treatment of functional constipation. Patient empowerment rather than health care promoted follow-up might be a step towards more effective treatment for childhood...

  5. Inspection control and the environmental protection

    Directory of Open Access Journals (Sweden)

    Milkov Dragan L.

    2015-01-01

    Full Text Available Environmental protection is the task of many administrative bodies, but the activity of the environmental inspection is of special importance. According to the Law on Environmental Protection, inspection's tasks in this area belong to the competence of republican bodies, ie. Ministry of Agriculture and Environmental Protection. Autonomous province and local self-government have only delegated competence in this field, under condition that this is explicitly regulated in special laws. Environmental inspection's activity consists in preventive actions, certain prior - preparatory activities and the audit itself. In addition, following the intervention of the Inspector issue of the control may be corrective or repressive. According to the Law on Inspection Control and the Law on Environmental Protection, the inspectors have a number of powers and responsibilities, which enable them to ensure the lawful and proper conduct of individuals and legal entities.

  6. Follow-Up Testing

    Science.gov (United States)

    ... second should occur after 1 year on the gluten-free diet. After that, a celiac should receive follow-up ... test result is straightforward—a celiac on the gluten-free diet should have a negative test. The numerical value ...

  7. Diffusion-weighted imaging for the follow-up of patients after matrix-associated autologous chondrocyte transplantation

    International Nuclear Information System (INIS)

    Friedrich, Klaus M.; Mamisch, Tallal C.; Plank, Christina; Langs, Georg; Marlovits, Stefan; Salomonowitz, Erich; Trattnig, Siegfried; Welsch, Goetz

    2010-01-01

    Objective: To evaluate the use of diffusion-weighted imaging (DWI) for the assessment of cartilage maturation in patients after matrix-associated autologous chondrocyte transplantation (MACT). Materials and methods: Fifteen patients after MACT were examined by 3.0-T magnetic-resonance-tomography; the examination was up to 13 month after surgery in group 1, and later than 13 month after surgery in group 2. Both groups had a follow-up one-year later. DWI was acquired using a steady-state gradient-echo sequence. Mean values of the diffusion quotients of regions of interest within cartilage repair tissue and of reference regions were assessed. Each region-of-interest was subdivided into a deep, and a superficial area. Results: Mean diffusion quotients of cartilage repair tissues were 1.44 (baseline), and 1.44 (follow-up). Mean diffusion quotients of reference tissues were 1.29 (baseline) and 1.28 (follow-up). At the follow-up diffusion quotients of cartilage repair tissue were significantly higher than those of reference cartilage. In group 1 the diffusion quotients were significantly lower at the follow-up (1.45 versus 1.65); in group 2 no statistically significant differences between follow-up (1.39) and baseline (1.41) were found. Reference cartilages and cartilage repair tissues of group 2 showed a decrease of diffusion quotients from the deep to the superficial area being stable at the follow-up. In group 1 initially a significant increase (1.49 versus 1.78) of the diffusion quotients from deep to superficial area of the cartilage repair tissue was found changing into a decrease (1.65 versus 1.52) at the follow-up. Conclusions: DWI detected changes of diffusion within cartilage repair tissue that may reflect cartilage maturation. Changes in diffusity occurred up to two years after surgery and were stable later. Zonal variations within cartilage could be measured.

  8. High throughput web inspection system using time-stretch real-time imaging

    Science.gov (United States)

    Kim, Chanju

    Photonic time-stretch is a novel technology that enables capturing of fast, rare and non-repetitive events. Therefore, it operates in real-time with ability to record over long period of time while having fine temporal resolution. The powerful property of photonic time-stretch has already been employed in various fields of application such as analog-to-digital conversion, spectroscopy, laser scanner and microscopy. Further expanding the scope, we fully exploit the time-stretch technology to demonstrate a high throughput web inspection system. Web inspection, namely surface inspection is a nondestructive evaluation method which is crucial for semiconductor wafer and thin film production. We successfully report a dark-field web inspection system with line scan speed of 90.9 MHz which is up to 1000 times faster than conventional inspection instruments. The manufacturing of high quality semiconductor wafer and thin film may directly benefit from this technology as it can easily locate defects with area of less than 10 microm x 10 microm where it allows maximum web flow speed of 1.8 km/s. The thesis provides an overview of our web inspection technique, followed by description of the photonic time-stretch technique which is the keystone in our system. A detailed explanation of each component is covered to provide quantitative understanding of the system. Finally, imaging results from a hard-disk sample and flexible films are presented along with performance analysis of the system. This project was the first application of time-stretch to industrial inspection, and was conducted under financial support and with close involvement by Hitachi, Ltd.

  9. To inspect, to motivate - or to do both? A dilemma for on-farm inspection of animal welfare

    DEFF Research Database (Denmark)

    Anneberg, Inger; Vaarst, Mette; Sandøe, Peter

    2013-01-01

    offenders should be treated equally. On the other hand, it may be argued that an important component of inspections is to enter into dialogue with farmers. This may be based on a more forward-looking view aimed at motivating farmers to look after the welfare of the animals in their care. In European...... countries, authorities try to enforce animal welfare legislation through inspections followed up by penalties in instances where a lack of compliance is found. However, the fairness and efficiency, and ultimately the public acceptance of the system, critically depend on the performance of the individual...

  10. The value of gynecologic cancer follow-up

    DEFF Research Database (Denmark)

    Lajer, Henrik; Jensen, Mette B.; Kilsmark, Jannie

    2010-01-01

    that follow-up affects the women's quality of life. CONCLUSIONS:: The main purpose of follow-up after treatment of cancer is improved survival. Our review of the literature showed no evidence of a positive effect on survival in women followed up after primary treatment of endometrial or ovarian cancer......INTRODUCTION:: To explore the extent of evidence-based data and cost-utility of follow-up after primary treatment of endometrial and ovarian cancer, addressing perspectives of technology, organization, economics, and patients. METHODS:: Systematic literature searches according......:: None of the identified studies supported a survival benefit from hospital-based follow-up after completion of primary treatment of endometrial or ovarian cancer. The methods for follow-up were of low technology (gynecologic examination with or without ultrasound examination). Other technologies had...

  11. Post-Closure Inspection Report for the Tonopah Test Range, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2006 and includes inspection and repair activities completed at the following nine CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 404: Roller Coaster Lagoons and Trench (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 426: Cactus Spring Waste Trenches (TTR); CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR). Post-closure inspections were conducted on May 9, 2006, May 31, 2006, and November 15, 2006. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2006, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 400, CAU 407, CAU 426, CAU 453, and CAU 487 in 2006. During the May inspection of CAU 400, it was identified that the east and west sections of chickenwire fencing beyond the standard fencing were damaged; they were repaired in June 2006. Also in June 2006, the southeast corner fence post and one warning sign at CAU 407 were reinforced and reattached, the perimeter fencing adjacent to the gate at CAU 426 was tightened, and large animal

  12. Post-Closure Inspection Report for the Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-06-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2006 and includes inspection and repair activities completed at the following nine CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 404: Roller Coaster Lagoons and Trench (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 426: Cactus Spring Waste Trenches (TTR); CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR). Post-closure inspections were conducted on May 9, 2006, May 31, 2006, and November 15, 2006. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2006, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 400, CAU 407, CAU 426, CAU 453, and CAU 487 in 2006. During the May inspection of CAU 400, it was identified that the east and west sections of chickenwire fencing beyond the standard fencing were damaged; they were repaired in June 2006. Also in June 2006, the southeast corner fence post and one warning sign at CAU 407 were reinforced and reattached, the perimeter fencing adjacent to the gate at CAU 426 was tightened, and large animal

  13. Radiological follow-up of uncemented knee prostheses. Preliminary study

    International Nuclear Information System (INIS)

    Martin Hervas, C.; Gomez Barrena, E.; Marquez Moreno, I.; Calle Yuste, F.; Ordonez Parra, J.M.

    1993-01-01

    The preliminary results of a prospective study of 40 uncemented total knee prostheses (TKP) are presented following a radiological protocol with fluoroscopic control and follow-up of over 2 years. The prosthesis-bone interface and the components alignment were assessed. Several radiological signs were studied to assess this interface with respect to the fixing of the component, but they showed little clinical correlation. Statistical significance (p<0.05, chisquare) was found only in the observation of sclerosis in areas of support for the tibital tray as a reaction of the bone. This radiological follow-up is of interest to determine the evolution of the interface and position of the implant to prevent complications (especially loosening) in patients, particularly those under 60 years old, who represent the group that can most benefit from prosthetic systems with uncemented anchorage because of their life expectation and level of activity. Author

  14. Internet of things and bariatric surgery follow-up: Comparative study of standard and IoT follow-up.

    Science.gov (United States)

    Vilallonga, Ramon; Lecube, Albert; Fort, José Manuel; Boleko, Maria Angeles; Hidalgo, Marta; Armengol, Manel

    2013-09-01

    Follow-up of obese patient is difficult. There is no literature related to patient follow-up that incorporates the concept of Internet of Things (IoT), use of WiFi, Internet, or portable devices for this purpose. This prospective observational study commenced in June 2011. Patients were prospectively offered to participate in the IoT study group, in which they received a WiFi scale (Withing®, Paris) that provides instant WiFi data to the patient and surgeon. Other patients were admitted to the standard follow-up group at the outpatient clinic. A total of 33 patients were included in our study (ten in the IoT group). Twelve patients did not have WiFi at home, ten lacked of computer knowledge, and seven preferred standard for follow-up. All patients underwent different surgical procedures. There were no complications. Excess weight loss (EWL) was similar in both groups. More than 90% of patients were satisfied. In the IoT group, patients considered it valuable in saving time, and considered seeing their evolution graphics extremely motivating. IoT technology can monitor medical parameters remotely and collect data. A WiFi scale can facilitate preoperative and follow-up. Standard follow-up in a classical outpatient clinic setting with the surgeon was preferred globally.

  15. Chapter 4. Assessment and inspection of nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    inspections: (1) Routine inspections performed mainly by site inspectors. They look whether the nuclear safety conditions and requirements are met. They also examine technical condition of nuclear equipment, performing surveillance testing of nuclear safety related equipment, observation of fulfilment of approved limits and conditions, selected operating procedures and programmes of quality assurance during construction and commissioning, operation and maintenance as well as in decommissioning nuclear installations. (2) Special inspections are focused on specific profession areas (such as fire safety, qualification and training of NPP personnel, etc.), especially on inspection of meeting specific requirements of nuclear safety. Team inspections are aimed at complex inspection of relevant nuclear equipment safety and they usually are being conducted simultaneously in several professional areas. The inspection of readiness of the nuclear installation for individual phases of commissioning is a typical example of a team inspection. This is the inspection of fulfilment of conditions imposed by UJD to the licensee to operate the nuclear power plant for issuing an approval to start up the unit after refuelling. Team inspections during operation are normally oriented to the areas, which are set based on long-term evaluation of results of nuclear installation's operator. (3) Extraordinary inspections are unplanned, evoked by unexpected operational events on nuclear installations, or the regulator responds by them to the situation in the organisation under supervision. In compliance with the 'Atomic Act' UJD performs inspections also during construction, reconstruction, repair and maintenance of nuclear installations in a form of participation of UJD inspectors at tests of selected equipment after its assembly is completed. The inspection activity of UJD has been performed by nuclear safety inspectors, the most of them having long-term experience in the relevant area. Inspectors

  16. Development of a swim-type ROV for narrow space inspection

    International Nuclear Information System (INIS)

    Okada, Satoshi; Otani, Kenichi; Kobayashi, Ryosuke; Ohno, Kazunori

    2017-01-01

    The swim-type remotely operated vehicle (ROV) for inspection of narrow spaces in nuclear power plants has been developed. Many structures are crowded in a confined space at regular intervals in the bottom area of a reactor. So, the thickness of the ROV shape is an important design point to ensure that the ROV can move in the space. The developed ROV has a three-dimensional swimming mechanism using six thrusters, three cameras for observing the position while moving and for making inspections easily, and a localization system. The localization system combines two elements: a gyroscope to detect the progression direction; and a slit laser that detects the progression distance using the optical cutting method. The localization method is called the modified inertial navigation (MIN) method and it was evaluated in a mock-up examination. The ROV was able to move smoothly using the MIN method and its position could be detected without making a mistake in the route followed. (author)

  17. Inspection during the starting-up phase of nuclear power plants in Spain

    International Nuclear Information System (INIS)

    Figueras Clavijo, J.M.

    1977-01-01

    At present a construction permit in the frame of the Spanish Nuclear Programme has been granted for seven nuclear power plants and three of these have reached an advanced construction stage. The first part of the paper deals with the technical procedures to be followed for commissioning a nuclear power plant according to the provisions of the 1972 regulations on nuclear and radioactive installations. The second part discusses the problems related to conduct of in-service inspections. (NEA) [fr

  18. A retrospective review of how nonconformities are expressed and finalized in external inspections of health-care facilities.

    Science.gov (United States)

    Hovlid, Einar; Høifødt, Helge; Smedbråten, Bente; Braut, Geir Sverre

    2015-09-23

    External inspections are widely used in health care as a means of improving the quality of care. However, the way external inspections affect the involved organization is poorly understood. A better understanding of these processes is important to improve our understanding of the varying effects of external inspections in different organizations. In turn, this can contribute to the development of more effective ways of conducting inspections. The way the inspecting organization states their grounds for noncompliant behavior and subsequently follows up to enforce the necessary changes can have implications for the inspected organization's change process. We explore how inspecting organizations express and state their grounds for noncompliant behavior and how they follow up to enforce improvements. We conducted a retrospective review, in which we performed a content analysis of the documents from 36 external inspections in Norway. Our analysis was guided by Donabedian's structure, process, and outcome model. Deficiencies in the management system in combination with clinical work processes was considered as nonconformity by the inspecting organizations. Two characteristic patterns were identified in the way observations led to a statement of nonconformity: one in which it was clearly demonstrated how deficiencies in the management system could affect clinical processes, and one in which this connection was not demonstrated. Two characteristic patterns were also identified in the way the inspecting organization followed up and finalized their inspection: one in which the inspection was finalized solely based on the documented changes in structural deficiencies addressed in the nonconformity statement, and one based on the documented changes in structural and process deficiencies addressed in the nonconformity statement. External inspections are performed to improve the quality of care. To accomplish this aim, we suggest that nonconformities should be grounded by

  19. What Facilitates "Patient Empowerment" in Cancer Patients During Follow-Up

    DEFF Research Database (Denmark)

    Jørgensen, Clara R; Thomsen, Thora G; Ross, Lone

    2018-01-01

    Empowerment is a concept of growing importance in cancer care, but little is known about cancer patients' experiences of empowerment during follow-up. To explore this area, a qualitative systematic literature review was conducted in PubMed, CINAHL, and PsycINFO. A total of 2,292 papers were...

  20. Rectal neoplasms. Postoperative follow-up

    International Nuclear Information System (INIS)

    Galano Urgelles, Rolando; Rodriguez Fernandez, Zenen; Casaus Prieto, Arbelio

    1997-01-01

    A study of 31 patients operated on for rectal neoplasms between September, 1989 and September, 1995 in SantiAug de Cuba was performed. Patients Webre followed-up during this period for the purpose of the study. There was a frank predominance of males and ages between 45 and 64, of the stage II and the groups BI and BII according to Dukes' classification. Most patients received 5-fluoracil, without tumor relapses. The current survival rate of the series was 76 % at the end of the investigation. It is recommended that all patients operated on for this segment be followed-up after the operation; to continue with cytostatic treatment using 5-fluoracil, and to emphasize the importance of the use of tumor markers during the follow-up, in addition to transrectal ultrasound, as well as to make an early diagnosis through mass screening methods

  1. Antinuclear antibodies in patients with polymorphic light eruption: a long-term follow-up study.

    Science.gov (United States)

    Tzaneva, S; Volc-Platzer, B; Kittler, H; Hönigsmann, H; Tanew, A

    2008-05-01

    Previous studies have shown elevated titres of antinuclear antibodies (ANA) in 2.9-19% of patients with polymorphic light eruption (PLE). A diagnosis of lupus erythematosus (LE) was finally established in some of these ANA-positive patients. To investigate whether the presence of ANA in patients with PLE merely represents an epiphenomenon or is associated with an increased risk of eventual progression to LE. We identified 472 patients with PLE who had received prophylactic photo(chemo)therapy between 1986 and 2003 and were routinely tested for the presence of ANA. All ANA-positive (ANA titre of>or=1:80) patients were asked to attend for a follow-up examination comprising a medical history, complete skin inspection and a detailed laboratory analysis including ANA and antibodies against extractable nuclear antigens. Of all the patients, 55 (11.7%) were found to be ANA positive on one or several occasions, and three (0.6%) also had antibodies to SS-A/Ro. Thirty-nine (71%) of all ANA-positive patients including all Ro+ subjects were available for follow-up after a median follow-up period of 8 years (interquartile range 5-11.5). Twenty-five patients showed persistence of ANA positivity with a median titre of 1:160 (range 1:80-1:640), whereas in 14 patients ANA titres had returned to normal levels. None of the patients revealed additional clinical, histopathological or laboratory abnormalities suggestive of LE. After a median follow-up period of 8 years none of the ANA-positive patients developed LE. Our findings indicate that PLE is a benign disease without tendency to progress to LE.

  2. 3He-MRI in follow-up of lung transplant recipients

    International Nuclear Information System (INIS)

    Gast, Klaus Kurt; Zaporozhan, Julia; Ley, Sebastian; Biedermann, Alexander; Knitz, Frank; Eberle, Balthasar; Schmiedeskamp, Joerg; Heussel, Claus-Peter; Mayer, Eckhard; Schreiber, Wolfgang Guenter; Thelen, Manfred; Kauczor, Hans-Ulrich

    2004-01-01

    The aim of this study was to evaluate the possible contribution of 3 He-MRI to detect obliterative bronchiolitis (OB) in the follow-up of lung transplant recipients. Nine single- and double-lung transplanted patients were studied by an initial and a follow-up 3 He-MRI study. Images were evaluated subjectively by estimation of ventilation defect area and quantitatively by individually adapted threshold segmentation and subsequent calculation of ventilated lung volume. Bronchiolitis obliterans syndrome (BOS) was diagnosed using pulmonary function tests. At 3 He-MRI, OB was suspected if ventilated lung volume had decreased by 10% or more at the follow-up MRI study compared with the initial study. General accordance between pulmonary function testing and 3 He-MRI was good, although subjective evaluation of 3 He-MRI underestimated improvement in ventilation as obtained by pulmonary function tests. The 3 He-MRI indicated OB in 6 cases. According to pulmonary function tests, BOS was diagnosed in 5 cases. All diagnoses of BOS were also detected by 3 He-MRI. In 2 of these 5 cases, 3 He-MRI indicated OB earlier than pulmonary function tests. The results support the hypothesis that 3 He-MRI may be sensitive for early detection of OB and emphasize the need for larger prospective follow-up studies. (orig.)

  3. Follow-up radiological surveillance, Marshall Islands

    International Nuclear Information System (INIS)

    Greenhouse, N.A.

    1978-01-01

    The political approvals have been given for the return of Bikini and Enewetak Atolls to their original inhabitants. These two regions, which comprised the Pacific Nuclear Testing Areas from 1946 to 1958, are now being repopulated by their original inhabitants and their families. Recent assessments of internal and external exposure pathways at Bikini and Enewetak have indicated that doses and dose commitments in excess of current radiation protection guidelines are possible or even likely for persons living in these areas. Rongelap and Utirik Atolls, which were downwind of the 1954 Bravo event, also received significant fallout; potential radiological problems exist in these areas as well. In view of this prospect, follow-up environmental monitoring and personnel monitoring programs are being established to maintain our cognizance of radiological conditions, and to make corrective action where necessary. The unexpected finding of detectable amounts (above background) of plutonium in the urine of individuals at Bikini and Rongelap Atolls also raises the possibility of radiological problems in the long term from environmentally-derived plutonium via pathways which are not completely understood. This finding adds further impetus to the surveillance programs for an area where real radiological concerns for the general public are already known to exist. The continuing environmental and personnel monitoring programs which this paper describes are a necessary part of the BNL radiological safety program in the Marshall Islands, which is designed to do the following: (1) elucidate the internal exposure pathways; (2) define the external radiation environment; (3) assess the doses and dose commitments from radioactivity in the environment; (4) provide the feedback necessary to improve existing predictive modelling of radiological trends; and (5) suggest actions which will minimize doses via the more significant pathways. (author)

  4. Shell Inspection History and Current CMM Inspection Efforts

    Energy Technology Data Exchange (ETDEWEB)

    Montano, Joshua Daniel [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-01-26

    The following report provides a review of past and current CMM Shell Inspection efforts. Calibration of the Sheffield rotary contour gauge has expired and the primary inspector, Matthew Naranjo, has retired. Efforts within the Inspection team are transitioning from maintaining and training new inspectors on Sheffield to off-the-shelf CMM technology. Although inspection of a shell has many requirements, the scope of the data presented in this report focuses on the inner contour, outer contour, radial wall thickness and mass comparisons.

  5. Inspection of the brazilian nuclear regulatory body in the area of radiotherapy. A critical analysis

    International Nuclear Information System (INIS)

    Brito, Ricardo Roberto de Azevedo

    2005-01-01

    The National Commission of Nuclear Energy (CNEN) is responsible in Brazil for the activities of licensing and control of radioactive installations in the radiotherapy medical area. The majority of these activities are developed by CNEN Co-ordination of Radioactive Installations (CORAD). One of the necessary stages for the development of licensing and control activities is the inspection of radiotherapy services (clinics and hospitals). Almost all of these inspections are carried out by CNEN Inst. of Radiation Protection and Dosimetry (IRD), through its Service of Medical Physics in Radiotherapy and Nuclear Medicine (SEFME). This work makes a survey of the main nonconformities found during ten years of inspections in radiotherapy services (1995 - 2004) and analyses the efficiency of these inspections in making the radiotherapy services develop their activities according to the norms in vigour in the country and adopt corrective actions against, at least, the nonconformities evidenced by CNEN inspectors. Additionally, it analyses the possibility of improvement and / or the optimisation of the process, through a procedure able to be unified and controlled, aiming a prompt communication to those involved in the licensing process (SEFME and CORAD) about the attendance by the radiotherapy services to the non-conformity items observed during the inspection. (author)

  6. Boiler inspection manipulator for Torness Power Station

    International Nuclear Information System (INIS)

    Carrey, R.T.A.; Yule, I.Y.; Sibson, S.; Playle, M.J.

    1996-01-01

    The Advanced Gas-cooled Reactors at Torness and Heysham 2 are provided with dedicated access for remote inspection equipment. These in-service inspection (ISI) accesses comprise 12 penetrations above the core for inspection of the above core area and boilers, 12 below core penetrations for inspection of the lower boiler area and access through any of the 8 gas circulator penetrations for inspection of the sub-diagrid area. This paper describes a manipulator which will access the reactor from above the core via any of the 8 peripheral penetrations. (UK)

  7. Use of volunteers' information to support proactive inspection of hydraulic structures

    Science.gov (United States)

    Cortes Arevalo, Juliette; Sterlacchini, Simone; Bogaard, Thom; Frigerio, Simone; Junier, Sandra; Schenato, Luca; van den Giesen, Nick

    2016-04-01

    Proactive management is particularly important to deal with the increasing occurrence of hydro-meteorological hazards in mountain areas were threats are often caused by multiple and sudden onset hazards such as debris flows. Citizen volunteers can be involved in supporting technicians on inspecting the structures' functional status. Such collaborative effort between managing organizations and local volunteers becomes more important under limited resources. To consider volunteers' information in support of proactive inspection of hydraulic structures, we developed a methodology applicable in day-to-day risk management. At first, in collaboration with technicians-in-charge, a data collection approach was developed for first level or pre-screening visual inspections that can be performed by volunteers. Methods comprise of a data collection exercise, an inspection forms and a learning session based on existent procedures in the FVG region and neighbouring regions. To systematically evaluate the individual inspection reports, we designed a support method by means of a multi-criteria method with fuzzy terms. The method allows the technicians-in-charge to categorize the reports in one of three levels, each corresponding with a course of action. To facilitate the evaluation of inspection reports, we transformed the decision support method into a prototype Web-GIS application. The design process of the Web-GIS framework followed a user-centred approach. The conceptual design incorporates four modules for managing the inspection reports: 1) Registered users, 2) Inspection planning; 3) Available reports and 4) Evaluation of reports. The development of the prototype focused on the evaluation module and was implemented based on standard and interoperable open source tools. Finally, we organized a workshop with technicians in the study area to test the decision support method and get insights about the usefulness of the Web-GIS framework. Participants that took part of the

  8. OSE inspection of computer security: Review

    International Nuclear Information System (INIS)

    Jaehne, E.M.

    1987-01-01

    The inspection process within the Department of Energy (DOE) serves the function of analyzing and reporting on the performance of security measures and controls in specific areas at sites throughout DOE. Three aspects of this process are discussed based on experience in computer security: Policy basis of performance inspections; Role and form of standards and criteria in inspections; and Conducting an inspection using the standards and criteria. Inspections are based on DOE and other applicable policy in each area. These policy statements have a compliance orientation in which the paper trail is often more clearly discernible than the security intention. The relationship of policy to performance inspections is discussed. To facilitate bridging the gap between the paper trail and the security intention defined by policy, standards and criteria were developed in each area. The consensus process and structure of the resulting product for computer security are discussed. Standards and criteria are inspection tools that support the site in preparing for an inspection and the inspector in conducting one. They form a systematic approach that facilitates consistency in the analysis and reporting of inspection results. Experience using the computer security standards and criteria is discussed

  9. Follow-up of rheumatic carditis using 67Ga-citrate imaging

    International Nuclear Information System (INIS)

    Calegaro, J.U.M.; Bae, S.H.; Prado, E.S.; Gomes, E.F.

    2002-01-01

    Aim: This study reports the follow -up of 25 patients (pts) with rheumatic carditis (9 male, 16 females; 4-29 years, mean 12,12) using 67-gallium citrate. Materials and Methods: the pts were divided in 2 groups: I- first attack (7pts, 2 males, with a mean follow-up of 5,65 years); II- recurrence (18 pts, 7 males, with a mean follow-up of 5,27 years).Images of the thorax and semi quantitative indexes were obtained 72 hours after intravenous injection of 37-74 MBq (1-2 mCi) of 67-gallium citrate, using a LFOV scintillation camera. 67-gallium uptake in the cardiac area was graded as mild, moderate or severe using the tracer uptake in the lung as a reference (normal up to 130%). Results: all pts in group I (2 severe, 2 moderate, and 3 mild carditis) had normal gallium uptake in up to 9 weeks after the institution of cortico therapy, with a better outcome in follow-up.In group II, 8 pts presented moderately active carditis (2 had good and 6 had a poor outcome) and 10 mildly active carditis (7 had good and 3 had poor outcome). The evolution of the disease was better in 8 pts that the reduction of 67- gallium uptake to normal limits occurred in up to 9 weeks, than in 9 pts that the scintigraphy was only normal after 10 weeks of therapy. Conclusion: normal gallium uptake in up to 9 weeks of treatment seems to be a good predictor of evolution in rheumatic carditis first attack or recurrence; in recurrence, reduction of 67-gallium uptake only after 10 weeks or increasing uptake seems to be worse predictors

  10. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Silvas, A. J. [National Security Technologies, LLC, Las Vegas, NV (United States). Nevada Test Site; Lantow, Tiffany A. [National Security Technologies, LLC, Las Vegas, NV (United States). Nevada Test Site

    2015-03-25

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.

  11. Non-Compliance and Follow-Up in Swedish Official and Private Animal Welfare Control of Dairy Cows

    Science.gov (United States)

    Hultgren, Jan; Röcklinsberg, Helena; Wahlberg, Birgitta

    2018-01-01

    Simple Summary In many cases, different animal welfare inspections are taking place at an animal farm over time, as the farmer has to comply with both the legislation and with various private standards. In this study, we compared official inspections carried out by CAB (the County Administrative Board, a governmental agency) with private inspections carried out by Arla Foods (a private company) on dairy farms in one Swedish county. For example, we looked at seasonal effects and compared the incidence of different non-compliances. This study shows that long time periods were sometimes allowed for correction, that follow-up systems are diverse, and that there were differences in the inspection result between CAB and Arla due to different focuses during the inspections. Dirty dairy cattle were, however, a common non-compliance found by both CAB and Arla. Tie-stall housing and winter season (Dec–Feb) were risk factors for non-compliance, while the risk was lower for both CAB and Arla to find non-compliances at organic farms compared to conventional farms. We conclude that the presence of both similarities and differences between different control systems underlines the need for transparency, predictability, and clarity of inspections. Abstract Farmers often have to comply with several sets of animal welfare regulations, since private standards have been developed in addition to legislation. Using an epidemiological approach, we analysed protocols from animal welfare inspections carried out in Swedish dairy herds by the County Administrative Board (CAB; official control of legislation) and by the dairy company Arla Foods (private control of Arlagården standard) during 2010–2013 in the county of Västra Götaland. CAB and Arla inspections were not carried out simultaneously. We aimed to identify common non-compliances, quantify risk factors of non-compliance, and investigate if non-compliances were based on animal-, resource-, or management-based requirements, as

  12. Container Inspection Utilizing 14 MeV Neutrons

    Science.gov (United States)

    Valkovic, Vladivoj; Sudac, Davorin; Nad, Karlo; Obhodas, Jasmina

    2016-06-01

    A proposal for an autonomous and flexible ship container inspection system is presented. This could be accomplished by the incorporation of an inspection system on various container transportation devices (straddle carriers, yard gentry cranes, automated guided vehicles, trailers). The configuration is terminal specific and it should be defined by the container terminal operator. This enables that no part of the port operational area is used for inspection. The inspection scenario includes container transfer from ship to transportation device with the inspection unit mounted on it. The inspection is performed during actual container movement to the container location. A neutron generator without associated alpha particle detection is used. This allows the use of higher neutron intensities (5 × 109 - 1010 n/s in 4π). The inspected container is stationary in the “inspection position” on the transportation device while the “inspection unit” moves along its side. The following analytical methods will be used simultaneously: neutron radiography, X-ray radiography, neutron activation analysis, (n, γ) and (n,n'γ) reactions, neutron absorption. and scattering, X-ray backscattering. The neutron techniques will utilize “smart collimators” for neutrons and gamma rays, both emitted and detected. The inspected voxel is defined by the intersection of the neutron generator and the detectors solid angles. The container inspection protocol is based on identification of discrepancies between the cargo manifest, elemental “fingerprint” and radiography profiles. In addition, the information on container weight is obtained during the container transport and screening by measuring of density of material in the container.

  13. Follow-up utterances in QA dialogue

    NARCIS (Netherlands)

    van Schooten, B.W.; op den Akker, Hendrikus J.A.

    2006-01-01

    The processing of user follow-up utterances by a QA system is a topic which is still in its infant stages, but enjoys growing interest in the QA community. In this paper, we discuss the broader issues related to handling follow-up utterances in a real-life "information kiosk" setting. With help of a

  14. The Follow-up IAEA International Mission on Remediation of Large Contaminated Areas Off-Site the Fukushima Daiichi Nuclear Power Plant, Tokyo and Fukushima Prefecture, Japan, 14-21 October 2013. Final Report

    International Nuclear Information System (INIS)

    2014-01-01

    In October 2011, the IAEA conducted an International Mission to Japan to support the remediation of large contaminated areas off-site TEPCO's Fukushima Daiichi Nuclear Power Plant (NPP). In response to the request made by the Government of Japan, in October 2013, the IAEA organized a follow-up International Mission on remediation of large contaminated areas off-site TEPCO's Fukushima Daiichi NPP (hereinafter referred to as the 'Follow-up Mission' or the 'Mission') with the main purpose of evaluating the progress of the on-going remediation works achieved since the previous mission in October 2011. The Follow-up Mission Team involved 13 international experts. Additionally, 3 experts of the Working Group 5 (Subgroup 5.2, Remediation) in charge of preparing the IAEA Report on TEPCO Fukushima Daiichi Accident accompanied the Mission as observers to obtain first-hand information for the report. The Follow-up Mission had the following three objectives: 1. To provide assistance to Japan in assessing the progress made with the remediation of the Special Decontamination Area (not included in the previous mission of 2011) and the Intensive Contamination Survey Areas; 2. To review remediation strategies, plans and works, in view of the advice provided by the previous mission on remediation of large contaminated off-site areas; and 3. To share its findings with the international community as lessons learned. The Mission was conducted through the assessment of information provided to the Team and by means of professional and open discussions with the relevant institutions in Japan, including national, prefectural and local institutions. The Japanese authorities provided comprehensive information on their remediation programme. The Mission Team visited the affected areas, including several sites where activities on remediation were conducted. The Team also visited some temporary storage sites for radioactive waste and soil generated in the remediation activities, as well as a

  15. Treatment and Follow Up

    Science.gov (United States)

    ... Close Celiac Disease Understanding Celiac Disease What is Celiac Disease? Symptoms Screening and Diagnosis Treatment and Follow-Up Dermatitis ... you find the right healthcare practitioner to discuss symptoms, diagnose, and ... Our nationwide Healthcare Practitioner Directory lists primary care ...

  16. Improving Neurodevelopmental Surveillance and Follow-up in Infants with Congenital Heart Disease.

    Science.gov (United States)

    Michael, Mark; Scharf, Rebecca; Letzkus, Lisa; Vergales, Jeffrey

    2016-01-01

    We hypothesize that neurodevelopmental surveillance of targeted patients with congenital heart disease during the admission for their cardiac surgery would improve neurodevelopmental assessment and outpatient follow-up rates. All patients under 12 months of age who were operated on between October 2013 and October 2014 and were considered at risk for neurodevelopmental delay in accordance with the 2012 American Heart Association Scientific Statement were included. A protocol was implemented to increase surveillance of targeted patients during the hospitalization for their cardiac surgery. A historical control cohort was used from a 6-month period that preceded initiation of the program from July 2012 to December 2012. Univariate analysis assessed the effects of patient demographics, anatomy, postoperative course, and distance from clinic on inpatient screening and follow-up to evaluate areas for future improvement. Neurodevelopmental surveillance in the post-protocol period increased from 21% to 82% (P neurodevelopmental surveillance of high risk patients. Individuals that were younger and in the hospital longer were more likely to be successfully seen and comply with outpatient follow-up than those not receiving inpatient risk assessment. Patients with single ventricle anatomy may benefit from a modified follow-up schedule to improve compliance rates. Travel distance has no effect on likelihood of outpatient cardiac neurodevelopmental follow-up. © 2016 Wiley Periodicals, Inc.

  17. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2012

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2013-01-28

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2012 and includes inspection and repair activities completed at the following CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 487: Thunderwell Site (TTR)

  18. Radiation-associated disease: disease incidence and cost effectiveness of follow-up

    International Nuclear Information System (INIS)

    Schramm, V.L. Jr.; Carroll, R.G.

    1979-01-01

    The organization, costs and outcome of a metropolitan area-wide recall campaign for patients irradiated for benign disease is documented. The campaign resulted in an increase in the number of thyroid malignancies discovered in both the irradiated and the nonirradiated population. The organization of the campaign cost $100,000. An estimated excess of 100 thyroid carcinomas were found in the 17 months following the campaign compared to the 17 months prior to the campaign in the Pittsburgh Standard Metropolitan Statistical Area. Of 150 patients who were radium exposed as infants and remained in the Pittsburgh area, 60% knew of their exposure only by direct hospital contact and were not reached by media public education. Seven of those 150 patients had thyroid carcinoma on 35 year follow-up, and 30% had some benign or malignant tumor

  19. Engineers find climbing techniques work well for dam inspections

    Energy Technology Data Exchange (ETDEWEB)

    O`Shea, M.; Graves, A. [Bureau of Reclamation, Denver, CO (United States)

    1996-10-01

    Climbing techniques adopted by the Bureau of Reclamation to inspect previously inaccessible or difficult to reach features at dams are described. Following the failure of the steel radial-arm gate at Folsom Dam, engineers mounted an effort to reach and inspect the dam`s seven other spillway gates. This close-up examination was performed to: (1) determine the condition of these gates; and (2) gather clues about the failure of the one gate. The access techniques described involved mountaineering techniques, as opposed to high scaling techniques, performed with dynamic and static nylon kermantle ropes.

  20. Timeliness of abnormal screening and diagnostic mammography follow-up at facilities serving vulnerable women.

    Science.gov (United States)

    Goldman, L Elizabeth; Walker, Rod; Hubbard, Rebecca; Kerlikowske, Karla

    2013-04-01

    Whether timeliness of follow-up after abnormal mammography differs at facilities serving vulnerable populations, such as women with limited education or income, in rural areas, and racial/ethnic minorities is unknown. We examined receipt of diagnostic evaluation after abnormal mammography using 1998-2006 Breast Cancer Surveillance Consortium-linked Medicare claims. We compared whether time to recommended breast imaging or biopsy depended on whether women attended facilities serving vulnerable populations. We characterized a facility by the proportion of mammograms performed on women with limited education or income, in rural areas, or racial/ethnic minorities. We analyzed 30,874 abnormal screening examinations recommended for follow-up imaging across 142 facilities and 10,049 abnormal diagnostic examinations recommended for biopsy across 114 facilities. Women at facilities serving populations with less education or more racial/ethnic minorities had lower rates of follow-up imaging (4%-5% difference, Pfacilities serving more rural and low-income populations had lower rates of biopsy (4%-5% difference, Pfacilities serving vulnerable populations had longer times until biopsy than those at facilities serving nonvulnerable populations (21.6 vs. 15.6 d; 95% confidence interval for mean difference 4.1-7.7). The proportion of women receiving recommended imaging within 11 months and biopsy within 3 months varied across facilities (interquartile range, 85.5%-96.5% for imaging and 79.4%-87.3% for biopsy). Among Medicare recipients, follow-up rates were slightly lower at facilities serving vulnerable populations, and among those women who returned for diagnostic evaluation, time to follow-up was slightly longer at facilities that served vulnerable population. Interventions should target variability in follow-up rates across facilities, and evaluate effectiveness particularly at facilities serving vulnerable populations.

  1. ROBOTIC TANK INSPECTION END EFFECTOR

    International Nuclear Information System (INIS)

    Rachel Landry

    1999-01-01

    The objective of this contract between Oceaneering Space Systems (OSS) and the Department of Energy (DOE) was to provide a tool for the DOE to inspect the inside tank walls of underground radioactive waste storage tanks in their tank farms. Some of these tanks are suspected to have leaks, but the harsh nature of the environment within the tanks precludes human inspection of tank walls. As a result of these conditions only a few inspection methods can fulfill this task. Of the methods available, OSS chose to pursue Alternating Current Field Measurement (ACFM), because it does not require clean surfaces for inspection, nor any contact with the Surface being inspected, and introduces no extra by-products in the inspection process (no coupling fluids or residues are left behind). The tool produced by OSS is the Robotic Tank Inspection End Effector (RTIEE), which is initially deployed on the tip of the Light Duty Utility Arm (LDUA). The RTEE combines ACFM with a color video camera for both electromagnetic and visual inspection The complete package consists of an end effector, its corresponding electronics and software, and a user's manual to guide the operator through an inspection. The system has both coarse and fine inspection modes and allows the user to catalog defects and suspected areas of leakage in a database for further examination, which may lead to emptying the tank for repair, decommissioning, etc.. The following is an updated report to OSS document OSS-21100-7002, which was submitted in 1995. During the course of the contract, two related sub-tasks arose, the Wall and Coating Thickness Sensor and the Vacuum Scarifying and Sampling Tool Assembly. The first of these sub-tasks was intended to evaluate the corrosion and wall thinning of 55-gallon steel drums. The second was retrieved and characterized the waste material trapped inside the annulus region of the underground tanks on the DOE's tank farms. While these sub-tasks were derived from the original intent

  2. Remote handling developments for inspection and repair of highly active reprocessing plant

    International Nuclear Information System (INIS)

    Jones, E.L.

    1988-01-01

    Having the capability to carry out regular and comprehensive inspection of active plant can have benefits beyond the need to satisfy the possible requirements of National Regulatory Authorities. Intermediate inspection can provide qualitative data on the state of the plant, whilst regular inspection can provide quantitative data on which to base predictive judgments. Information of this sort can allow confidence in predicting the actual life of the plant as opposed to the theoretical. The following paper addresses the areas of plant inspection and repair by reference to specific projects either already completed or at an advanced stage of development at BNFL's Sellafield reprocessing plant. (author)

  3. The clinical course of asymptomatic esophageal candidiasis incidentally diagnosed in general health inspection.

    Science.gov (United States)

    Lee, Sang Pyo; Sung, In-Kyung; Kim, Jeong Hwan; Lee, Sun-Young; Park, Hyung Seok; Shim, Chan Sup

    2015-01-01

    Esophageal candidiasis mostly occurs in the immunocompromised host. However, it may also affect healthy people and is frequently asymptomatic. The clinical significance of asymptomatic esophageal candidiasis (AEC) is still unclear. The aims of the study were to investigate the prevalence of AEC during health inspection and to identify its predisposing factors and clinical significance. A total of 49,497 subjects who underwent a health inspection that included upper endoscopy were enrolled. We retrospectively reviewed the subject's self-reporting questionnaires, medical records and endoscopic findings. We considered "long-term" follow-up to be >6 months with at least one more follow-up endoscopy. One hundred and seventy (0.4%) subjects were endoscopically diagnosed as esophageal candidiasis and 141 subjects were AEC. Multivariate analysis revealed that old age (≥60 years) was an independent risk factor for AEC (OR, 1.862, p = 0.005). The number of subjects with long-term follow-up was 79 (195.3 person-years). Among these, AEC of 64 subjects (81.0%) had disappeared on the follow-up endoscopy and was not recurrent. The other 15 subjects had AEC diagnosed more than once on the follow-up endoscopy, and 5 of them were spontaneously healed during the follow-up period. The remaining 10 subjects whose candidiasis was sustained up to the last endoscopy did not complain of symptoms during the follow-up period, and their endoscopic findings did not worsen. AEC is rare and old age is the only risk factor. AEC does not require medical care because it is a self-limited disease.

  4. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2008-01-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as

  5. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2008-06-01

    This report provides the results of the semiannual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2007 and includes inspection and repair activities completed at the following nine CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR); (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). In a letter from the Nevada Division of Environmental Protection (NDEP) dated December 5, 2006, NDEP concurred with the request to reduce the frequency of post-closure inspections of CAUs at TTR to an annual frequency. This letter is included in Attachment B. Post-closure inspections were conducted on May 15-16, 2007. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in May 2007, and the vegetation monitoring report is included in Attachment F. Maintenance and/or repairs were performed at CAU 453. Animal burrows observed during the annual inspection at CAU 453 were backfilled on August 1, 2007. At this time, the TTR post-closure site inspections should continue as

  6. Esophageal atresia: long-term interdisciplinary follow-up

    Directory of Open Access Journals (Sweden)

    Lidia B. Giúdici

    2016-07-01

    Full Text Available Background: We provide protocolized interdisciplinary follow-up to babies born with Esophageal Atresia (EA. There are few reports in Argentina about follow-up of EA patients.Objective: To describe outcomes in follow-up of EA patients at 1, 3 and 6 years old and to compare outcomes at age 1 with those at age 6.Methods: Prospective, longitudinal, analytic study of the cohort of babies born with EA, admitted to the follow-up program from 11/01/03 to 10/31/14. Follow-up includes: growth (weight > 10th centile, WHO, neurology-psychomotor development, audiology, vision, genetic, mental health, surgical reintervention, phonostomatology, language, pulmonology, re-hospitalization for clinical causes, lost to follow-up. Outcomes were described at age 1, 3 and 6. We included all EA patients who had reached age 1 at the start of this study.Results: 27 babies were admitted; 30% had long-gap EA; 18% presented VACTERL association; 23 children met inclusion criteria. Genetics  was assessed in 18 newborns (78%; a chromosomal map was performed in 11 babies; 3 had an abnormal karyotype. Mental health: 5/14 of the assessed children showed problems. Phonostomatology: 11 newborns checked (6 required treatment, 4 recovered at age 1. Pulmonologist evaluated 18 babies (7 with recurrent wheezing, 6 with moderate tracheomalacia. Gastroenterology and endoscopy: 80% presented gastroesophageal reflux (GER grade 3-4, and 50% showed a pathologic pHmetry. Lost to follow-up: age 1, 2 (8%; age 3, 3 (17%; age 6, 3 (23%. Normal outcomes observed are the following. Age 1 – growth: 81%; neurologic-psychomotor developmental index (NPDI: 76%; audiology: 95%; vision: 85%; language: 62%; re-hospitalization for clinical causes: 38%; surgical reinterventions: 47%. Age 3 – growth: 78%; NPDI: 50%; audiology: 93%; vision: 93%; language: 43%; re-hospitalization: 35%; surgical reinterventions: 14%. Age 6 – growth: 50%; NPDI: 30%; audiology: 90%; vision: 40%; language: 50%; re

  7. Use of mountaineering rope climbing techniques vs custom-built platforms for penstock inspections

    Energy Technology Data Exchange (ETDEWEB)

    Bechai, M.; Dmochowski, A.; Conlon, J.; Bhat, P.D. [Ontario Hydro, Toronto, ON (Canada); Henderson, D. [Remote Access Technology Inc., Dartmouth, NS (Canada)

    1998-12-01

    Ontario Hydro has developed an inspection and maintenance strategy that requires periodic inspections of their ageing penstocks. The utility has 149 operating penstocks distributed throughout the province. Ontario Hydro experienced problems ranging from minor deterioration to major failures requiring immediate and costly shut-down of entire stations. Three levels of the inspection and maintenance strategy are described. These are a routine external inspections, periodic internal and external inspections, and detailed inspection and assessment. Detailed inspection requires full access to all areas of the penstock, inside and outside, with detailed testing and analysis. Rope access techniques have been used successfully and cost effectively to gain access for close up observation and tactile contact allowing for evaluation and testing. Minor, quick repairs can also be carried out. It was noted that specially designed platforms will still be needed when extensive repairs and maintenance is required. 2 refs., 1 tab., 3 figs.

  8. Inspection activities of the Mexican regulatory body during the construction stage of the first unit of Laguna Verde Nuclear Power Plant

    International Nuclear Information System (INIS)

    Salgado Gonzalez, Julio Ricardo

    1996-01-01

    The paper addresses the regulatory framework established for the design, construction and operation of the NPP. The regulatory bases of the inspection program are mentioned.A summary of the inspection and reviewing activities carried out by the former Nuclear Safety Management Construction area during the construction stage, taking the year 1977 as the beginning of regular inspection activities for this construction stage, and up to the year 1987, when this one is considered as practically completed, and a stage of pre-operational tests has been started. Finally, the main inspection areas are described, and a summary is given of the classification of deficiencies detected during the inspections

  9. Packaging supplier inspection guide

    International Nuclear Information System (INIS)

    Stromberg, H.M.; Gregg, R.E.; Kido, C.; Boyle, C.D.

    1991-05-01

    This is document is a guide for conducting quality assurance inspections of transportations packaging suppliers, where suppliers are defined as designers, fabricators, distributors, users, or owners of transportation packaging. This document can be used during an inspection to determine regulatory compliance within the requirements of 10 Code of Federal Regulations, Part 71, Subpart H (10 CFR 71.101--71.135). The guidance described in this document provides a framework for an inspection. It provides the inspector with the flexibility to adapt the methods and concepts presented here to meet the needs of the particular facility being inspected. The guide was developed to ensure a structured and consistent approach for inspections. The method treats each activity at a supplier facility as a separate entity (or functional element), and combines the activities within the framework of an ''inspection tree.'' The method separates each functional element into several areas of performance and then identifies guidelines, based on regulatory requirements, to be used to qualitatively rate each area. This document was developed to serve as a field manual to facilitate the work of inspectors. 1 ref., 1 fig., 5 tabs

  10. Personality and cognitive decline in the Baltimore Epidemiologic Catchment Area follow-up study.

    Science.gov (United States)

    Hock, Rebecca S; Lee, Hochang Benjamin; Bienvenu, O Joseph; Nestadt, Gerald; Samuels, Jack F; Parisi, Jeanine M; Costa, Paul T; Spira, Adam P

    2014-09-01

    To determine the association between personality domains and 11-year cognitive decline in a sample from a population-based study. Data from Waves 3 (1993-1996) and 4 (2003-2004) of the Baltimore cohort of the Epidemiologic Catchment Area (ECA) study were used for analyses. The sample included 561 adults (mean age ± SD: 45.2 ± 10.78 years) who completed the NEO Personality Inventory-Revised prior to Wave 4. Participants also completed the Mini-Mental State Examination (MMSE) and immediate and delayed word recall tests at Wave 3, and at Wave 4, 10.9 ± 0.6 years later. In models adjusted for baseline cognitive performance, demographic characteristics, medical conditions, depressive symptoms, and psychotropic medication use, each 10-point increase in Neuroticism T-scores was associated with a 0.15-point decrease in MMSE scores (B = -0.15, 95% confidence interval [CI]: -0.30, -0.01), whereas each 10-point increase in Conscientiousness T-scores was associated with a 0.18-point increase on the MMSE (B = 0.18, 95% CI: 0.04, 0.32) and a 0.21-point increase in immediate recall (B = 0.21, 95% CI: 0.003, 0.41) between baseline and follow-up. Findings suggest that greater Neuroticism is associated with decline, and greater Conscientiousness is associated with improvement in performance on measures of general cognitive function and memory in adults. Further studies are needed to determine the extent to which personality traits in midlife are associated with clinically significant cognitive outcomes in older adults, such as mild cognitive impairment and dementia, and to identify potential mediators of the association between personality and cognitive trajectories. Copyright © 2014 American Association for Geriatric Psychiatry. Published by Elsevier Inc. All rights reserved.

  11. The Danish Cerebral Palsy Follow-up Program

    DEFF Research Database (Denmark)

    Rasmussen, Helle Mätzke; Nordbye-Nielsen, Kirsten; Møller-Madsen, Bjarne

    2016-01-01

    AIM OF DATABASE: The Danish Cerebral Palsy Follow-up Program is a combined follow-up program and national clinical quality database that aims to monitor and improve the quality of health care for children with cerebral palsy (CP). STUDY POPULATION: The database includes children with CP aged 0...... indicators in three of five regions in Denmark comprising 432 children with CP, corresponding to a coverage of 82% of the expected population. CONCLUSION: The Danish Cerebral Palsy Follow-up Program is currently under development as a national clinical quality database in Denmark. The database holds...

  12. The use of NPAR [Nuclear Plant Aging Research] results in plant inspection activities

    International Nuclear Information System (INIS)

    Gunther, W.; Taylor, J.

    1989-01-01

    The Nuclear Plant Aging Research (NPAR) Program is a hardware oriented research program which has produced a large data base of equipment and system operating, maintenance, and testing information. A review of the NRC Inspection Program and discussions with NRC inspection personnel have revealed several areas where NPAR research results would be valuable to the inspector. This paper describes the NPAR information which can enhance inspection activities, and provides alternatives for making these pertinent research results available to the inspectors. The NRC Inspection Program emphasis is on evaluating the performance of licensees by focusing on requirements and standards associated with administrative, managerial, engineering, and operational aspects of licensee activities. The Program recognizes that licensees may satisfy NRC requirements differently, and therefore expresses inspection guidance in the form of performance objectives and evaluation criteria. for the resident and regional inspectors, procedures have been written covering various subject areas, such as operations, maintenance, and surveillance. Some of these procedures contain guidance related to aging degradation. The types of information generated by NPAR which were found to be relevant to inspection needs include the following: functional indicators; failure modes, causes, effects; stresses which cause degradation; maintenance recommendations; inspection prioritization. 3 refs

  13. Visual inspection. Better than your eyes

    International Nuclear Information System (INIS)

    Jakobs, N.; Baumgartl, R.

    2005-01-01

    Ongoing improvements in the development of camera technologies and manipulator techniques permit an enhanced performance of inspection tasks in nuclear services. In areas of reduced dose rate it's possible to use small size high resolution CCD cameras instead of tube cameras. Underwater inspections may be performed by submarine instead of rigid manipulator systems. This allows the enlargement of inspection areas and the performance at reduced time and personnel dose rate. (author)

  14. Diffusion-weighted MR images and pineoblastoma. Diagnosis and follow-up

    International Nuclear Information System (INIS)

    Gasparetto, Emerson L.; Cruz Junior, L. Celso Hygino; Doring, Thomas M.; Domingues, Romeu C.; Araujo, Bertha; Dantas, Mario Alberto; Chimelli, Leila

    2008-01-01

    Pineoblastomas are uncommon pineal tumors, which demonstrate rapid growing and poor prognosis. We report the case of a 43-year-old man with an enhancing pineal region mass, which showed restriction of the diffusion on diffusion-weighted (DW) MR images. The surgical biopsy defined the diagnosis of pineoblastoma and the therapy was initiated with radiation and chemotherapy. Three months later, the follow-up MR imaging showed areas suggestive of necrosis and the DW images demonstrate no significant areas of restricted diffusion. The differential diagnosis of pineal region masses that could show restriction of diffusion is discussed. (author)

  15. Regulatory inspection of the egyptian gamma irradiator using a proposed inspection checklist

    International Nuclear Information System (INIS)

    Abdel-Ghani, A.H.

    2000-01-01

    Regulatory inspections are one of the most important elements of a regulatory programme. It shall be performed in all areas of the regulatory responsibility and during all phases of siting, design, construction, commissioning, operation, maintenance and decommissioning of an irradiator facility. The egyptian mega gamma irradiator operating since december 1979 has a Co-60 source of about 400 kilo curies and is used mainly for sterilization of medical supplies and pharmaceuticals and for preservation of some food stuffs. The constructor (Nordion international Inc.) recommended an extensive inspection programme. In accordance with the international and national (2.3) regulations as well as the licensing conditions, the competent authority (NCNSRC) shall perform regulatory inspections both announced and unannounced. In order to facilitate the inspection task and to harmonize the inspection reports a checklist for inspection is proposed which can be used also as an inspection report form

  16. 29 CFR 99.315 - Audit findings follow-up.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Audit findings follow-up. 99.315 Section 99.315 Labor Office... § 99.315 Audit findings follow-up. (a) General. The auditee is responsible for follow-up and corrective... include the reference numbers the auditor assigns to audit findings under § 99.510(c). Since the summary...

  17. Teleoperated mobile robot (KAEROT) for inspection in nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Byung-Soo; Kim, Chang-Hoi; Hwang, Suk-Young; Kim, Seung-Ho; Lee, Jong-Min [Korea Atomic Energy Research Inst., Taejon (Korea, Republic of)

    1994-12-31

    A teleoperated mobile robot, named as KAEROT, has been developed for inspection and maintenance in nuclear facilities. It is composed of the planetary wheel-type mobile unit and 5 DOF manipulator one. The mobile unit is able to climb up and down stairs with high stability. This paper presents the kinematic analysis of KAEROT and the stair climbing algorithm. The proposed algorithm consists of two parts; one is to generate the moving path, and the other is to calculate the angular velocity of each wheel to follow up the generated reference path. Simulations and experiments on the irregular stairs have been carried out with the developed mobile robot. The proposed algorithm is proved to be very effective for inspection in nuclear facilities. The inclination angle of robot is maintained below 30.8deg while it is climbing up the stairs of a slope of 25deg. (author).

  18. Teleoperated mobile robot (KAEROT) for inspection in nuclear facilities

    International Nuclear Information System (INIS)

    Kim, Byung-Soo; Kim, Chang-Hoi; Hwang, Suk-Young; Kim, Seung-Ho; Lee, Jong-Min

    1994-01-01

    A teleoperated mobile robot, named as KAEROT, has been developed for inspection and maintenance in nuclear facilities. It is composed of the planetary wheel-type mobile unit and 5 DOF manipulator one. The mobile unit is able to climb up and down stairs with high stability. This paper presents the kinematic analysis of KAEROT and the stair climbing algorithm. The proposed algorithm consists of two parts; one is to generate the moving path, and the other is to calculate the angular velocity of each wheel to follow up the generated reference path. Simulations and experiments on the irregular stairs have been carried out with the developed mobile robot. The proposed algorithm is proved to be very effective for inspection in nuclear facilities. The inclination angle of robot is maintained below 30.8deg while it is climbing up the stairs of a slope of 25deg. (author)

  19. Lifestyle habits and mortality from all and specific causes of death: 40-year follow-up in the Italian Rural Areas of the Seven Countries Study.

    Science.gov (United States)

    Menotti, A; Puddu, P E; Lanti, M; Maiani, G; Catasta, G; Fidanza, A Alberti

    2014-03-01

    Three lifestyle factors were investigated in a population study to explore their relationships with a long-term mortality. In a cohort of 1564 men aged 45-64 and examined in 1965 within the Italian Rural Areas of the Seven Countries Study, smoking habits, physical activity at work and eating habits (as derived from factor analysis) were determined. During the follow-up 693 men died in 20 years and 1441 in 40 years. In Cox proportional hazards models men smoking cigarettes (versus never smokers), those having a sedentary activity (versus the very active) and those following the Diet Score 1, indexing an unhealthy Diet (versus men with a Diet close to the healthy Mediterranean style) had highly significant hazards ratios (HR) in relations with 20- and 40-year mortality from all causes, coronary heart disease (CHD), cardiovascular disease (CVD) and cancer. HR for all causes in 40 years were 1.44 (95% confidence intervals, CI, 1.27 and 1.64) for smokers, 1.43 (CI 1.23 and 1.67) for sedentary people, and 1.31 (CI 1.15 and 1.50) for men with unhealthy diet. Larger HR were found for CHD, CVD and cancers deaths. Combination of 3 unhealthy risk factors versus their absence was associated with 4.8-year life loss in the 20-year follow-up and 10.7-year in the 40-year follow-up. Lifestyle behavior linked to physical activity and smoking and eating habits is strongly associated with mortality and survival in middle aged men during long-term follow-up.

  20. Appraising the value of independent EIA follow-up verifiers

    Energy Technology Data Exchange (ETDEWEB)

    Wessels, Jan-Albert, E-mail: janalbert.wessels@nwu.ac.za [School of Geo and Spatial Sciences, Department of Geography and Environmental Management, North-West University, C/O Hoffman and Borcherd Street, Potchefstroom, 2520 (South Africa); Retief, Francois, E-mail: francois.retief@nwu.ac.za [School of Geo and Spatial Sciences, Department of Geography and Environmental Management, North-West University, C/O Hoffman and Borcherd Street, Potchefstroom, 2520 (South Africa); Morrison-Saunders, Angus, E-mail: A.Morrison-Saunders@murdoch.edu.au [School of Geo and Spatial Sciences, Department of Geography and Environmental Management, North-West University, C/O Hoffman and Borcherd Street, Potchefstroom, 2520 (South Africa); Environmental Assessment, School of Environmental Science, Murdoch University, Australia. (Australia)

    2015-01-15

    Independent Environmental Impact Assessment (EIA) follow-up verifiers such as monitoring agencies, checkers, supervisors and control officers are active on various construction sites across the world. There are, however, differing views on the value that these verifiers add and very limited learning in EIA has been drawn from independent verifiers. This paper aims to appraise how and to what extent independent EIA follow-up verifiers add value in major construction projects in the developing country context of South Africa. A framework for appraising the role of independent verifiers was established and four South African case studies were examined through a mixture of site visits, project document analysis, and interviews. Appraisal results were documented in the performance areas of: planning, doing, checking, acting, public participating and integration with other programs. The results indicate that independent verifiers add most value to major construction projects when involved with screening EIA requirements of new projects, allocation of financial and human resources, checking legal compliance, influencing implementation, reporting conformance results, community and stakeholder engagement, integration with self-responsibility programs such as environmental management systems (EMS), and controlling records. It was apparent that verifiers could be more creatively utilized in pre-construction preparation, providing feedback of knowledge into assessment of new projects, giving input to the planning and design phase of projects, and performance evaluation. The study confirms the benefits of proponent and regulator follow-up, specifically in having independent verifiers that disclose information, facilitate discussion among stakeholders, are adaptable and proactive, aid in the integration of EIA with other programs, and instill trust in EIA enforcement by conformance evaluation. Overall, the study provides insight on how to harness the learning opportunities

  1. Appraising the value of independent EIA follow-up verifiers

    International Nuclear Information System (INIS)

    Wessels, Jan-Albert; Retief, Francois; Morrison-Saunders, Angus

    2015-01-01

    Independent Environmental Impact Assessment (EIA) follow-up verifiers such as monitoring agencies, checkers, supervisors and control officers are active on various construction sites across the world. There are, however, differing views on the value that these verifiers add and very limited learning in EIA has been drawn from independent verifiers. This paper aims to appraise how and to what extent independent EIA follow-up verifiers add value in major construction projects in the developing country context of South Africa. A framework for appraising the role of independent verifiers was established and four South African case studies were examined through a mixture of site visits, project document analysis, and interviews. Appraisal results were documented in the performance areas of: planning, doing, checking, acting, public participating and integration with other programs. The results indicate that independent verifiers add most value to major construction projects when involved with screening EIA requirements of new projects, allocation of financial and human resources, checking legal compliance, influencing implementation, reporting conformance results, community and stakeholder engagement, integration with self-responsibility programs such as environmental management systems (EMS), and controlling records. It was apparent that verifiers could be more creatively utilized in pre-construction preparation, providing feedback of knowledge into assessment of new projects, giving input to the planning and design phase of projects, and performance evaluation. The study confirms the benefits of proponent and regulator follow-up, specifically in having independent verifiers that disclose information, facilitate discussion among stakeholders, are adaptable and proactive, aid in the integration of EIA with other programs, and instill trust in EIA enforcement by conformance evaluation. Overall, the study provides insight on how to harness the learning opportunities

  2. Monitoring and inspection techniques for long term storage of higher activity waste packages

    International Nuclear Information System (INIS)

    Bolton, Gary

    2013-01-01

    In 2009, following recent changes in United Kingdom (UK) Government Policy, the Nuclear Decommissioning Authority (NDA) identified a knowledge gap in the area of long term interim storage of waste packages. A cross-industry Integrated Project Team (IPT) for Interim Storage was created with responsibility for delivering Industry Guidance on the storage of packaged Higher Activity Waste (HAW) for the current UK civil decommissioning and clean-up programmes. This included a remit to direct research and development projects via the NDA's Direct Research Portfolio (DRP) to fill the knowledge gap. The IPT for Interim Storage published Industry Guidance in 2012 which established a method to define generic package performance criteria and made recommendations on monitoring and inspection. The package performance method consists of the following steps; identification of the package safety function, identification of evolutionary processes that may affect safety function performance, determination of measurable indicators of these evolutionary processes and calibration of the indicators into package performance zones. This article provides an overview of three projects funded by the NDA's DRP that the UK National Nuclear Laboratory (NNL) have completed to address monitoring and inspection needs of waste packages in interim storage. (orig.)

  3. Development of bore tools for pipe inspection

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Kiyoshi; Nakahira, Masataka; Taguchi, Kou; Ito, Akira [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    In the International Thermonuclear Reactor (ITER), replacement and maintenance on in-vessel components requires that all cooling pipes connected be cut and removed, that a new component be installed, and that all cooling pipes be rewelded. After welding is completed, welded area must be inspected for soundness. These tasks require a new work concept for securing shielded area and access from narrow ports. Tools had to be developed for nondestructive inspection and leak testing to evaluate pipe welding soundness by accessing areas from inside pipes using autonomous locomotion welding and cutting tools. A system was proposed for nondestructive inspection of branch pipes and the main pipe after passing through pipe curves, the same as for welding and cutting tool development. Nondestructive inspection and leak testing sensors were developed and the basic parameters were obtained. In addition, the inspection systems which can move inside pipes and conduct the nondestructive inspection and the leak testing were developed. In this paper, an introduction will be given to the current situation concerning the development of nondestructive inspection and leak testing machines for the branch pipes. (author)

  4. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009

    International Nuclear Information System (INIS)

    2010-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2009 and includes inspection and repair activities completed at the following seven CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 426: Cactus Spring Waste Trenches (TTR); (5) CAU 453: Area 9 UXO Landfill (TTR); (6) CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR); and (7) CAU 487: Thunderwell Site (TTR). The annual post-closure inspections were conducted May 5-6, 2009. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2009, and the vegetation monitoring report is included in Attachment F. Maintenance was performed at CAU 453. Animal burrows observed during the annual inspection were backfilled, and a depression was restored to grade on June 25, 2009. Post-closure site inspections should continue as scheduled. Vegetation survey inspections have been conducted annually at CAUs 400, 404, 407, and 426. Discontinuation of vegetation surveys is recommended at the CAU 400 Bomblet Pit and CAU 426, which have been successfully revegetated. Discontinuation of vegetation surveys is also recommended at CAU 404, which has been changed to an administrative closure with no inspections

  5. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2010-05-28

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2009 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR) The annual post-closure inspections were conducted May 5–6, 2009. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2009, and the vegetation monitoring report is included in Attachment F. Maintenance was performed at CAU 453. Animal burrows observed during the annual inspection were backfilled, and a depression was restored to grade on June 25, 2009. Post-closure site inspections should continue as scheduled. Vegetation survey inspections have been conducted annually at CAUs 400, 404, 407, and 426. Discontinuation of vegetation surveys is recommended at the CAU 400 Bomblet Pit and CAU 426, which have been successfully revegetated. Discontinuation of vegetation surveys is also recommended at CAU 404, which has been changed to an administrative closure with no inspections required. Vegetation

  6. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2010

    International Nuclear Information System (INIS)

    2011-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2010 and includes inspection and repair activities completed at the following seven CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 426: Cactus Spring Waste Trenches (TTR); (5) CAU 453: Area 9 UXO Landfill (TTR); (6) CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR); and (7) CAU 487: Thunderwell Site (TTR).

  7. Follow-up of Antihypertensive Therapy Improves Blood Pressure Control: Results of HYT (HYperTension survey) Follow-up.

    Science.gov (United States)

    Fici, F; Seravalle, G; Koylan, N; Nalbantgil, I; Cagla, N; Korkut, Y; Quarti-Trevano, F; Makel, W; Grassi, G

    2017-09-01

    Although improved during the past few years, blood pressure control remains sub optimal. The impact of follow-up assessment on blood pressure control was evaluated in a group of patients of the HYT (HYperTension survey), treated with a combination of different dihydropyridine calcium-channel blockers (CCBs regimen) and inhibitors of renin-angiotensin-aldosterone system (RAAS) and with uncontrolled blood pressure. This was obtained assessing (a) the rate of blood pressure control at 3 and 6 months of follow-up in the whole group of patients, (b) the rate of blood pressure control and the average blood pressure values in subjects treated with different DHP-CCBs regimen. From the 4993 patients with uncontrolled blood pressure, (BP ≥ 140/90 or ≥140/85 in patients with diabetes), 3729 (mean age 61.2 ± 11.5 years), maintained CCBs regimen combined wih RAAS blockers and were evaluated at 3 and 6 months follow-up. At each visit BP (semiautomatic device, Omron-M6, 3 measurements), heart rate, adverse events and treatment persistence were collected. At 1st and 2nd follow-up the rate of controlled BP was 63.5 and 72.8% respectively (p blood pressure control; (b) there is no significant difference in the antihypertensive effect between different CCBs regimen; (c) lipophilic CCBs induce less ankle edema.

  8. Post-Closure Inspection Report for the Tonopah Test Range, Nevada: For Calendar Year 2017, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Alvarado, Juan; Matthews, Patrick

    2018-05-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). This report covers calendar year 2017 and includes visual inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Visual inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The annual post-closure inspections were conducted on May 23, 2017. No maintenance or repair issues were noted at CAU 400 and CAU 487. Maintenance items and subsequent repairs include the following: • CAU 407: A large animal burrow was observed in the southeast corner of the cover during the inspection. Two additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018. • CAU 424: CAS 03-08-002-A304 (Landfill Cell A3-4): A new monument was installed and the subsidence area was repaired on January 9, 2018. • CAU 424: CAS 03-08-002-A308 (Landfill Cell A3-8): Lava rock, used to mark the two eastern monument locations, was noted as missing during the inspection. The lava rock was replaced on January 9, 2018. • CAU 453: Five large animal burrows, located near the east–central portion of cover, was noted during the inspection. Eight additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018.

  9. Screening for cervical cancer among HIV-positive and HIV-negative women in Cameroon using simultaneous co-testing with careHPV DNA testing and visual inspection enhanced by digital cervicography: Findings of initial screening and one-year follow-up.

    Science.gov (United States)

    Cholli, Preetam; Bradford, Leslie; Manga, Simon; Nulah, Kathleen; Kiyang, Edith; Manjuh, Florence; DeGregorio, Geneva; Ogembo, Rebecca K; Orock, Enow; Liu, Yuxin; Wamai, Richard G; Sheldon, Lisa Kennedy; Gona, Philimon N; Sando, Zacharie; Welty, Thomas; Welty, Edith; Ogembo, Javier Gordon

    2018-01-01

    The World Health Organization (WHO)'s cervical cancer screening guidelines for limited-resource settings recommend sequential screening followed by same-day treatment under a "screen-and-treat" approach. We aimed to (1) assess feasibility and clinical outcomes of screening HIV-positive and HIV-negative Cameroonian women by pairing visual inspection with acetic acid and Lugol's iodine enhanced by digital cervicography (VIA/VILI-DC) with careHPV, a high-risk human papillomavirus (HR-HPV) nucleic acid test designed for low-resource settings; and (2) determine persistence of HR-HPV infection after one-year follow-up to inform optimal screening, treatment, and follow-up algorithms. We co-tested 913 previously unscreened women aged ≥30years and applied WHO-recommended treatment for all VIA/VILI-DC-positive women. Baseline prevalence of HR-HPV and HIV were 24% and 42%, respectively. On initial screen, 44 (5%) women were VIA/VILI-DC-positive, of whom 22 had HR-HPV infection, indicating 50% of women screened false-positive and would have been triaged for unnecessary same-day treatment. VIA/VILI-DC-positive women with HIV infection were three times more likely to be HR-HPV-positive than HIV-negative women (65% vs. 20%). All women positive for either VIA/VILI-DC or HR-HPV (n=245) were invited for repeat co-testing after one year, of which 136 (56%) returned for follow-up. Of 122 women who were HR-HPV-positive on initial screen, 60 (49%) re-tested negative, of whom 6 had received treatment after initial screen, indicating that 44% of initially HR-HPV-positive women spontaneously cleared infection after one year without treatment. Women with HIV were more likely to remain HR-HPV-positive on follow-up than HIV-negative women (61% vs. 22%, p<0.001). Treatment was offered to all VIA/VILI-DC positive women on initial screen, and to all women screening VIA/VILI-DC or HR-HPV positive on follow-up. We found careHPV co-testing with VIA/VILI-DC to be feasible and valuable in

  10. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Silvas, A. J.

    2014-03-03

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

  11. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2008

    International Nuclear Information System (INIS)

    2009-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2008 and includes inspection and repair activities completed at the following ten CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 404: Roller Coaster Lagoons and Trench (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 426: Cactus Spring Waste Trenches (TTR) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) CAU 487: Thunderwell Site (TTR)

  12. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2009-03-19

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2008 and includes inspection and repair activities completed at the following ten CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 404: Roller Coaster Lagoons and Trench (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 426: Cactus Spring Waste Trenches (TTR) CAU 427: Area 3 Septic Waste Systems 2, 6 (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) CAU 487: Thunderwell Site (TTR)

  13. Last experiences on ID BWR shroud inspection and the new developments to examine the below core plate areas

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, R.; Gonzalez, E.; Willke, A.; Yague, L. [TECNATOM SA, Madrid (Spain)

    2001-07-01

    In recent years, the owners of BWR type nuclear power plants have had to address new inspection requirements relating to the core shroud inside the reactor vessel, the aim of which is to contain the fuel assemblies and provide support for the structures located in the upper part of the reactor. The shroud consists of a cylinder measuring some 40-50 mm in thickness, manufactured from various sections of AISI-304 stainless steel and INCONEL, joined by vertical and circumferential welds. The appearance of unstable cracks in these welds would directly affect the structural integrity of the component and the safety of the plant. As regards access to the core shroud and to the surface to be examined, two alternatives might be considered: inspection from outside the component, moving along the so-called annulus between the reactor vessel wall and the component (OD inspection), or from the interior (ID inspection). With a view to addressing this problem, Tecnatom has in recent years launched several projects, grouped under the generic name TEIDE, in order to develop scanners and NDT techniques achieving the maximum inspection coverage of this component. The decision was taken to perform ID inspections, mainly because this type of scanners were not available at that time, and which provide the 4 following advantages. 1) Maximum inspected weld length. This avoids interference with the jet pumps and the systems present in the annulus and affecting OD inspections. Besides, the repairs performed on in-service core shrouds in all cases imply the addition of new fixed elements on their outer surface, since the fuel assembly space must be left free. 2) Reduction of inspection times and of unforeseen events: maintenance of planning schedules, reduction of personnel doses, reduced critical path time. 3) High inspection accuracy and repeatability. 4) Simplification of equipment positioning work (similar to the installation of fuel assemblies). As regards inspection techniques, the

  14. Tele consultation and tele follow up of thyroid cancer patients: A pilot study

    International Nuclear Information System (INIS)

    Pradhan, P.K.; Das, B.K.; Mohanty, B.N.; Mishra, S.K.

    2005-01-01

    their evaluation and admission could be finalised and instructions for withdrawal of thyroxin could be given to patients. Out of twenty follow up cases, only thirteen patients were required to come to SGPGIMS, Lucknow. Rest of the seven patients could be managed with instructions and need not travel to our Institution. Telemedicine has been utilised for follow up of patients in several areas. Gilmour et al emphasised the importance of telemedicine for diagnosis and management of dermatology cases referred from primary care. Fifty percent of patients could have been managed by single tele consultation without requirement of further specialist intervention. Alen et al reported the utilisation of telemedicine in cancer patients in rural areas. Redlick et al used telemedicine to evaluate patient and physician satisfaction with tele-consultations in follow up of burn cases and to assess the cost and benefit of tele-consultations. Patients were very satisfied with their tele-consultations and found them more economical and time efficient than in person visits. Telemedicine technology has been utilised for diagnosis of thyroid disorders. However, tele-consultation and tele-follow up of thyroid cancer patients before and after radioiodine therapy has never been utilised as per published literature. This telemedicine tool has strong potential for consultations of patients with thyroid cancer and monitoring them subsequently at timed interval following radioiodine treatment.In our pilot study 100% of patients consented and subsequently received radioiodine and 35% of follow up patients did not visit our Institution at Lucknow because of live interaction through telemedicine. The tele-consultation and tele-follow up of thyroid cancer patients provided great degree of patient satisfaction because of direct audio visual contact. Saving of travel expenses as well as inconvenience to travel such long distances could be achieved in 35% of cases. This is substantial both in terms of

  15. MR findings of neuro-Behcet's disease: initial and follow-up changes

    International Nuclear Information System (INIS)

    Kim, Hyun Beom; Chang, Ki Hyun; Kim, Hong Dae; Han, Moon Hee; Kang, Heung Sik; Lee, Joon Woo; Yu, In Kyu; Seong, Su Ok; Kim, Hyung Seok

    2000-01-01

    To evaluate the MR findings of neuro B ehcet's disease, and changes occurring during follow up. Brain MR imaging was performed in 19 patients in whom neuro-Behcet's disease had been clinically diagnosed. After treatment with corticosteroids and immunosuppressive agents, 23 follow-up MR images were obtained in 12 patients, and a total of 42 MR images were retrospectively reviewed by two radiologists. Of the 19 patients, 17 (89%) had parenchymal lesions, and the other two had dural venous sinus thrombosis. Among the 17 patients with parenchymal lesions, three showed leptomeningeal enhancement. A total of 72 parenchymal lesions were detected on initial MR images; 55 (76%) were patchy or nodular in shape and the lesion of the internal capsule appeared linear. Seventeen lesions (24%) in 12 patients were confluent. In order of frequency, the involved sites were the pons, midbrain, thalamus, basal ganglia, internal capsule, and frontal lobe. Thirteen lesions of 39 lesions detected on postcontrast images were enhanced, and a mass effect was seen in the area of 16 parenchymal lesions. Associated findings were microhemorrhage of the brain in two patients and spinal cord involvement in one. On short-term follow-up images obtained 1 week to 2 months after intensive treatment during the acute stage of the illness, the leptomeningeal enhancement seen in three patients had decreased and most parenchymal lesions showed improvement. Long-term follow-up images obtained 3 months to 3 years late showed that parenchymal lesions had relapsed in five patients, and brainstem atrophy had developed or progressed in five others. The most characteristic MR finding of neuro-Behcet's disease is multiple non-hemorrhagic lesions involving the brainstem. Leptomeningeal enhancement and dural venous sinus thrombosis may also be noted. On follow-up MR, the lesions may show either improvement or aggravation, and brainstem atrophy is not uncommon. (author)

  16. How Agencies Inspect. A Comparative Study of Inspection Policies in Eight Swedish Government Agencies

    International Nuclear Information System (INIS)

    Lindblom, Lars; Clausen, Jonas; Edvardsson, Karin; Hayenhielm, Madeleine; Hermansson, Helene; Nihlen, Jessica; Palm, Elin; Ruden, Christina; Wikman, Per; Hansson, Sven Ove

    2003-04-01

    Eight Swedish authorities with inspection tasks in the areas of health, safety, and environmental protection have been compared, namely the authorities responsible for nuclear safety, radiation protection, railway, marine and aviation safety, environmental protection, chemicals control, and health and safety on workplaces. Significant differences in inspection policies and practices between the authorities were found, such as: diverging definitions of supervision and inspection that complicate comparisons, different priority-setting principles for inspections, variations in inspection frequencies (between 13 and 0.03 inspections per company and year), different practices with respect to notifying companies before inspection visits, and in particular, large differences in the extent to which non-compliance with regulations is reported to legal authorities. It was concluded that these agencies have much to gain from increasing their cooperation in methods development, evaluation studies, and education of inspectors

  17. Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada, for Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-09-01

    This report presents data collected during the annual post-closure site inspection conducted at the Central Nevada Test Area Surface Corrective Action Unit (CAU) 417 in May 2007. The annual post-closure site inspection included inspections of the UC-1, UC-3, and UC-4 sites in accordance with the Post-Closure Monitoring Plan provided in the CAU 417 Closure Report (NNSA/NV 2001). The annual inspection conducted at the UC-1 Central Mud Pit (CMP) indicated the site and soil cover were in good condition. No new cracks or fractures were observed in the soil cover during the annual inspection. A crack on the west portion of the cover was observed during the last quarterly inspection in December 2006. This crack was filled with bentonite as part of the maintenance activities conducted in February 2007 and will be monitored during subsequent annual inspections. The vegetation on the soil cover was adequate but showing signs of the area's ongoing drought. No issues were identified with the CMP fence, gate, or subsidence monuments. New DOE Office of Legacy Management signs with updated emergency phone numbers were installed as part of this annual inspection, no issues were identified with the warning signs and monuments at the other two UC-1 locations. The annual subsidence survey was conducted at UC-1 CMP and UC-4 Mud Pit C as part of the maintenance activities conducted in February 2007. The results of the subsidence surveys indicate that the covers are performing as expected, and no unusual subsidence was observed. A vegetation survey of the UC-1 CMP cover and adjacent areas was conducted as part of the annual inspection in May 2007. The vegetation survey indicated that revegetation continues to be successful, although stressed due to the area's prevailing drought conditions. The vegetation should continue to be monitored to document any changes in the plant community and to identify conditions that could potentially require remedial action to maintain a viable

  18. How to share inspection practices internationally?

    International Nuclear Information System (INIS)

    Zerger, B.

    2009-01-01

    ASN strives to share practices with its foreign counterparts in order to develop and adopt best practice worldwide. With regard to inspection practices, the exchanges are made with AEN, in particular within the context of the Working Group on Inspection Practices (WGIP). As well as being very rewarding, the exchanges sometimes come up against marked differences in terms of inspection organisation and even in the meaning given to the inspections. The WGIP endeavors, however, to make inspection practice recommendations that are as functional and feasible as possible. (author)

  19. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  20. Chronic Heart Failure Follow-up Management Based on Agent Technology.

    Science.gov (United States)

    Mohammadzadeh, Niloofar; Safdari, Reza

    2015-10-01

    Monitoring heart failure patients through continues assessment of sign and symptoms by information technology tools lead to large reduction in re-hospitalization. Agent technology is one of the strongest artificial intelligence areas; therefore, it can be expected to facilitate, accelerate, and improve health services especially in home care and telemedicine. The aim of this article is to provide an agent-based model for chronic heart failure (CHF) follow-up management. This research was performed in 2013-2014 to determine appropriate scenarios and the data required to monitor and follow-up CHF patients, and then an agent-based model was designed. Agents in the proposed model perform the following tasks: medical data access, communication with other agents of the framework and intelligent data analysis, including medical data processing, reasoning, negotiation for decision-making, and learning capabilities. The proposed multi-agent system has ability to learn and thus improve itself. Implementation of this model with more and various interval times at a broader level could achieve better results. The proposed multi-agent system is no substitute for cardiologists, but it could assist them in decision-making.

  1. 15-Year Follow-Up

    OpenAIRE

    Karjula, Salla; Morin-Papunen, Laure; Auvinen, Juha; Ruokonen, Aimo; Puukka, Katri; Franks, Stephen; Jarvelin, Marjo-Riitta; Tapanainen, Juha S.; Jokelainen, Jari; Miettunen, Jouko; Piltonen, Terhi T.

    2017-01-01

    Context: Polycystic ovary syndrome (PCOS) is associated with increased psychological distress, obesity and hyperandrogenism being suggested as key promoters. Objectives: To investigate the prevalence of anxiety/depression and their coexistence in women with PCOS/PCOS-related symptoms at ages 31 and 46. The roles of obesity, hyperandrogenism, and awareness of PCOS on psychological distress were also assessed. Design: Population-based follow-up. Setting: Northern Finland Birth Cohort 1966 with ...

  2. Peritoneal inclusion cysts: Changes on follow-up ultrasonography

    International Nuclear Information System (INIS)

    Kim, Jung Sik; Lee, Jin Hee; Lee, Hee Jung; Lee, Sung Moon; Woo, Seong Ku

    2003-01-01

    To evaluate the volume change of peritoneal inclusion cysts on the follow-up ultrasonography (US). From March 1995 to May 1999, thirty seven women with ultrasonographically diagnosed peritoneal inclusion cysts were included in this study. Six patients underwent surgery for several reasons. Follow-up ultrasonography was performed 70-456 days (mean=191 days) after initial US examination in 12 of the remaining 31 patient with no further treatment. US was performed with a 3.5 or 4 MHz transabdominal probe in all 18 patients who underwent either surgery or follow-up US, and additional tranvaginal US examination using a 5-7 MHz probe in 15 of 18 patients. The volume change of the cysts was recorded for each US examination. Three cysts (25%) (volume=170 cm 3 , 61 cm 3 , and 38 cm 3 , respectively) were completely resolved on the follow-up US while the other nine cysts showed a decreased volume in seven patients (58%) and increased volume in two patients (17%). Spontaneous regression of peritoneal inclusion cysts is more common than it is believed to be, and ultrasonography may be a useful follow-up examination for peritoneal inclusion cysts.

  3. Follow-up care for breast cancer survivors: improving patient outcomes

    Directory of Open Access Journals (Sweden)

    Chopra I

    2014-08-01

    Full Text Available Ishveen Chopra,1 Avijeet Chopra2 1Department of Pharmacy Administration, Duquesne University, Pittsburgh, PA, USA; 2Department of Molecular and Cell Biology, University of Connecticut, Storrs, CT, USA Background: Appropriate follow-up care is important for improving health outcomes in breast cancer survivors (BCSs and requires determination of the optimum intensity of clinical examination and surveillance, assessment of models of follow-up care such as primary care-based follow-up, an understanding of the goals of follow-up care, and unique psychosocial aspects of care for these patients. The objective of this systematic review was to identify studies focusing on follow-up care in BCSs from the patient's and physician's perspective or from patterns of care and to integrate primary empirical evidence on the different aspects of follow-up care from these studies. Methods: A comprehensive literature review and evaluation was conducted for all relevant publications in English from January 1, 1990 to December 31, 2013 using electronic databases. Studies were included in the final review if they focused on BCS’s preferences and perceptions, physician's perceptions, patterns of care, and effectiveness of follow-up care. Results: A total of 47 studies assessing the different aspects of follow-up care were included in the review, with a majority of studies (n=13 evaluating the pattern of follow-up care in BCSs, followed by studies focusing on BCS's perceptions (n=9 and preferences (n=9. Most of the studies reported variations in recommended frequency, duration, and intensity of follow-up care as well as frequency of mammogram screening. In addition, variations were noted in patient preferences for type of health care provider (specialist versus non-specialist. Further, BCSs perceived a lack of psychosocial support and information for management of side effects. Conclusion: The studies reviewed, conducted in a range of settings, reflect variations in

  4. Immunological follow-up of hydatid cyst cases

    Directory of Open Access Journals (Sweden)

    Bulut Vedat

    2001-01-01

    Full Text Available Hydatid disease is caused by Echinococcus granulosus. In this study, we aimed to investigate the benefit of monitoring cases with hydatid cyst by means of immune components in patients in a long-term follow-up after surgery. Eighty-four preoperative and postoperative serum samples from 14 cases undergoing surgery for hydatid disease were evaluated in terms of immune parameters, such as total and specific IgE, IgG, IgM, IgA and complement. Total and specific IgE were determined by ELISA. Specific IgG levels were measured by indirect hemaglutination.Total IgG, IgM, IgA and complement (C3 and C4 were detected by nephelometry. Imaging studies were also carried out during the follow-up. In none of the patients hydatid cysts were detected during the follow-up. Total IgE levels in the sera of the patients decreased to normal six months after surgery. Although specific IgE against echinococcal antigens decreased one year after operation, levels were still significantly high. There were no changes in the levels of anti-Echinococcus IgG and total IgG in follow-up period. Additionally, other parameters, such as IgA, IgM, C3 and C4, were not affected.

  5. Structured nursing follow-up: does it help in diabetes care?

    Science.gov (United States)

    Shani, Michal; Nakar, Sasson; Lustman, Alex; Lahad, Amnon; Vinker, Shlomo

    2014-01-01

    In 1995 Clalit Health Services introduced a structured follow-up schedule, by primary care nurses, of diabetic patients. This was supplementary care, given in addition to the family physician's follow-up care. This article aims to describe the performance of diabetes follow-up and diabetes control in patients with additional structured nursing follow-up care, compared to those patients followed only by their family physician. We randomly selected 2,024 type 2 diabetic subjects aged 40-76 years. For each calendar year, from 2005-2007, patients who were "under physician follow-up only" were compared to those who received additional structured nursing follow-up care. Complete diabetes follow-up parameters including: HbA1c, LDL cholesterol, microalbumin, blood pressure measurements and fundus examination. The average age of study participants was 60.7 years, 52% were females and 38% were from low socioeconomic status (SES). In 2005, 39.5% of the diabetic patients received structured nursing follow-up, and the comparable figures for 2006 and 2007 were 42.1% 49.6%, respectively. The intervention subjects tended to be older, from lower SES, suffered from more chronic diseases and visited their family physician more frequently than the control patients. Patients in the study group were more likely to perform a complete diabetes follow-up plan: 52.8% vs. 21.5% (2005; p nursing follow-up care were more likely to perform complete diabetes follow-up protocol. Our results reinforce the importance of teamwork in diabetic care. Further study is required to identify strategies for channeling the use of the limited resources to the patients who stand to benefit the most.

  6. Inspection of power and ground layers in PCB images

    Science.gov (United States)

    Bunyak, Filiz; Ercal, Fikret

    1998-10-01

    In this work, we present an inspection method for power and ground (P&G) layers of printed circuit boards (PCB) also called utility layers. Design considerations for the P&G layers are different than those of signal layers. Current PCB inspection approaches cannot be applied to these layers. P&G layers act as internal ground, neutral or power sources. P&G layers are predominantly copper with occasional pad areas (without copper) called clearance. Defect definition is based on the spacing between the holes that will be drilled in clearances and the surrounding copper. Overlap of pads of different sizes and shapes are allowed. This results in complex, hard to inspect clearances. Our inspection is based on identification of shape, size and position of the individual pads that contribute to an overlapping clearance and then inspection of each pad based on design rules and tolerances. Main steps of our algorithm are as follows: (1) extraction and preprocessing of clearance contours; (2) decomposition of contours into segments: corner detection and matching lines or circular arcs between two corners; (3) determination of the pads from partial contour information obtained in step (2), and (4) design rules checking for each detected pad.

  7. New methods for estimating follow-up rates in cohort studies

    Directory of Open Access Journals (Sweden)

    Xiaonan Xue

    2017-12-01

    Full Text Available Abstract Background The follow-up rate, a standard index of the completeness of follow-up, is important for assessing the validity of a cohort study. A common method for estimating the follow-up rate, the “Percentage Method”, defined as the fraction of all enrollees who developed the event of interest or had complete follow-up, can severely underestimate the degree of follow-up. Alternatively, the median follow-up time does not indicate the completeness of follow-up, and the reverse Kaplan-Meier based method and Clark’s Completeness Index (CCI also have limitations. Methods We propose a new definition for the follow-up rate, the Person-Time Follow-up Rate (PTFR, which is the observed person-time divided by total person-time assuming no dropouts. The PTFR cannot be calculated directly since the event times for dropouts are not observed. Therefore, two estimation methods are proposed: a formal person-time method (FPT in which the expected total follow-up time is calculated using the event rate estimated from the observed data, and a simplified person-time method (SPT that avoids estimation of the event rate by assigning full follow-up time to all events. Simulations were conducted to measure the accuracy of each method, and each method was applied to a prostate cancer recurrence study dataset. Results Simulation results showed that the FPT has the highest accuracy overall. In most situations, the computationally simpler SPT and CCI methods are only slightly biased. When applied to a retrospective cohort study of cancer recurrence, the FPT, CCI and SPT showed substantially greater 5-year follow-up than the Percentage Method (92%, 92% and 93% vs 68%. Conclusions The Person-time methods correct a systematic error in the standard Percentage Method for calculating follow-up rates. The easy to use SPT and CCI methods can be used in tandem to obtain an accurate and tight interval for PTFR. However, the FPT is recommended when event rates and

  8. POST-CLOSURE INSPECTION REPORT FOR THE TONOPAH TEST RANGE, NEVADA, FOR CALENDAR YEAR 2004

    Energy Technology Data Exchange (ETDEWEB)

    BECHTEL NEVADA

    2005-04-01

    This Post-Closure Inspection Report provides an analysis and summary of the semi-annual inspections conducted at the Tonopah Test Range (TTR) during Calendar Year 2004. The report includes the inspection and/or repair activities completed at the following nine Corrective Action Units (CAUs) located at TTR, Nevada: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 404: Roller Coaster Lagoons and Trench (TTR); (3) CAU 407: Roller Coaster RadSafe Area (TTR); (4) CAU 423: Area 3 Underground Discharge Point, Building 0360 (TTR) (5) CAU 424: Area 3 Landfill Complexes (TTR); (6) CAU 426: Cactus Spring Waste Trenches (TTR); (7) CAU 427: Area 3 Septic Waste Systems 2,6 (TTR); (8) CAU 453: Area 9 UXO Landfill (TTR); and (9) CAU 487: Thunderwell Site (TTR). Site inspections were conducted on July 7,2004, and November 9-10,2004. All inspections were conducted according to the post-closure plans in the approved Closure Reports (CRs). The post-closure inspection plan for each CAU is included in Appendix B, with the exception of CAU 400 and CAU 423. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. In addition, post-closure inspections are not currently required at CAU 423; however, the CR is being revised to include inspection requirements. The inspection checklists for each site inspection are included in Appendix C, the field notes are included in Appendix D, and the site photographs are included in Appendix E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2004, and the vegetation monitoring report is included in Appendix F. In addition, topographic survey results of two repaired landfill cells in CAU 424 are included in Appendix G. Maintenance and/or repairs were performed at the CAU 400 Five Points Landfill, CAU 407, CAU 424, CAU 427, and CAU 487. CAU 400 repairs included mending the fence, reseeding of a flood damaged area, and

  9. Comparing the effects of education using telephone follow-up and smartphone-based social networking follow-up on self-management behaviors among patients with hypertension.

    Science.gov (United States)

    Najafi Ghezeljeh, Tahereh; Sharifian, Sanaz; Nasr Isfahani, Mehdi; Haghani, Hamid

    2018-03-05

    Little is known about the benefits of social networks in the management of patients. The aim of this study was to compare the effects of self-management (SM) education using telephone follow-up and mobile phone-based social networking on SM behaviors among patients with hypertension. This randomized clinical trial was conducted with 100 patients. They were randomly allocated to four groups: (i) control, (ii) SM training without follow-up, (iii) telephone follow-up and (iv) smartphone-based social networking follow-up. The hypertension SM behavior questionnaire was used for data collection before and six weeks after the study. Those patients who underwent SM education training (with and without follow-up) had statistically significant differences from those in the control group in terms of SM behaviors (p social networking follow-up influenced SM behaviors among patients with hypertension.

  10. Can JWST Follow Up on Gravitational-Wave Detections?

    Science.gov (United States)

    Kohler, Susanna

    2016-02-01

    SearchIntegration time needed for JWSTs NIRCam to detect a kilonova at 200 Mpc, as a function of time since the merger. Different curves correspond to different NIRCam filters. Note that the total time for follow-up is overwhelmingly dominated by things like telescope slew time, rather than by this exposure time. [Bartos et al. 2016]In a recent study, a team of authors led by Imre Bartos (Columbia University) evaluatewhether JWST will be capable of catching these kilonovae if LIGO finds gravitational wave signals.Bartos and collaborators calculate that, given the sensitivity of the different filters on JWSTs Near-Infrared Camera, the instrument should easily be able to detect a kilonova 200 Mpc away (a typical distance at which LIGO might be able to find a neutron-star binary). But theres a catch: 10 deg2 is a really big sky area, and it would take JWST an unfeasible amount of time (days!) to fully cover it.The authors suggest insteadusing a targeted search. Since most mergers are expected to be in or near galaxies, JWST could specifically focus the follow-up search on known galaxies within the searcharea. This approach would bring the total search time down to 12.6 hours, which is within the realm of feasibility. And this time could be reduced even further by concentrating on galaxies most likely to host kilonovae, like those with high star-formation rates.The conclusion: if LIGO is able to detect gravitational waves, JWST will provide an excellent means to follow up on the detection in the attempt toidentify the source.CitationI. Bartos et al 2016 ApJ 816 61. doi:10.3847/0004-637X/816/2/61

  11. Radiation control in the nondestructive inspection

    International Nuclear Information System (INIS)

    Kariya, Yukihiro

    1982-01-01

    In the early days of radiation nondestructive inspection about ten years ago, the loss of radiation sources and careless radiation exposure gave the impression of radiography inspection being immediately slipshod management. In this problem, the peculiar nature of the business in this field is involved. In Nondestructive Inspection Co., Ltd., besides the safety management of radioisotopes, the radiation exposure control of personnel in the regular inspection of nuclear power plants has become increasingly important. The following matters are described: radiation utilization in nondestructive inspection (X- and #betta#-ray radiography, #betta#-ray leak test on shield), radiation control problems in nondestructive inspection business (the peculiar aspects of the business, the analysis of the incidents related with nondestructive inspection), and the practice of radiation control in nondestructive inspection in Nondestructive Inspection Co., Ltd. (Mori, K.)

  12. National screening program vs. standardized neurodevelopmental follow-up

    NARCIS (Netherlands)

    Maschke, Cornelia; Ellenrieder, Birte; Hecher, Kurt; Bartmann, Peter

    Background: Long-term follow-up is urgently needed to decide on the consequences of new therapies. Objective: This study assesses the use of a national child development screening program for a follow-up examination of a defined patient group. Patients and methods: Neurodevelopmental outcome of 139

  13. China's coal export and inspection

    International Nuclear Information System (INIS)

    Xiaodong Li

    1993-01-01

    With the development of world's business and trade, coal has become a large part of the import and export goods in the international market. The total amount of coal trade has risen a lot. China is rich in coal resources. According to the estimate made by some experts, the reserve which has been explored recently could be exploited hundreds of years. China's output of raw coal has risen a lot during the past forty years. China coal industry has developed rapidly since the 1980s. It is possible for China to become a big coal export country since it has rich resources and increasing output. The paper suggests four steps which must be taken to expand coal exports in China: improve the level of management and administration of coal mines so as to raise the economic benefit; the follow-up production capacity of the present mines must be enhanced rapidly; step up construction of new large-scale mines; and China's coal washing capacity must be improved speedily since the low capacity has seriously influenced the improvement of coal quality. The paper describes the inspection bureaus and companies that have developed to perform inspection of exports in order to guarantee the quality of export coal

  14. PWR vessel inspection performance improvements

    International Nuclear Information System (INIS)

    Blair Fairbrother, D.; Bodson, Francis

    1998-01-01

    A compact robot for ultrasonic inspection of reactor vessels has been developed that reduces setup logistics and schedule time for mandatory code inspections. Rather than installing a large structure to access the entire weld inspection area from its flange attachment, the compact robot examines welds in overlapping patches from a suction cup anchor to the shell wall. The compact robot size allows two robots to be operated in the vessel simultaneously. This significantly reduces the time required to complete the inspection. Experience to date indicates that time for vessel examinations can be reduced to fewer than four days. (author)

  15. Carcinoembryonic Antigen (CEA) in colorectal cancer follow-up

    NARCIS (Netherlands)

    Verberne, Charlotte

    2016-01-01

    Colorectal cancer follow-up aims to detect recurrent disease as soon as possible, since earlier detection of recurrent disease is associated with greater chances for cure. A part of follow-up is the measurement of Carcinoembryonic Antigen (CEA) in the blood of the patient. This tumor marker is

  16. Barriers to follow-up for pediatric cataract surgery in Maharashtra, India: How regular follow-up is important for good outcome. The Miraj Pediatric Cataract Study II

    Directory of Open Access Journals (Sweden)

    Parikshit Gogate

    2014-01-01

    Full Text Available Background: Regular follow up and amblyopia treatment are essential for good outcomes after pediatric cataract surgery. Aim: To study the regularity of follow-up after cataract surgery in children and to gauge the causes of poor compliance to follow up. Subjects: 262 children (393 cataracts who underwent cataract surgery in 2004-8. Materials and Methods: The children were identified and examined in their homes and a "barriers to follow-up" questionnaire completed. Demographic data collected, visual acuity estimated, and ocular examination performed. Statistical Analysis: SPSS version 19. Results: Of the 262 children, only 53 (20.6% had been regularly following up with any hospital, 209 (79.4% had not. A total of 150 (57.3% were boys and the average age was 13.23 years (Std Dev 5 yrs. Poor follow up was associated with the older age group ( P 1 line with regular follow-up. Conclusion: Regular follow-up is important and improves vision; eye care practitioners need to take special efforts to ensure better follow-up.

  17. Assessment of ASN inspections apart from BNI (Greater South West)

    International Nuclear Information System (INIS)

    Menechal, Ph.

    2008-01-01

    After having recalled recent evolutions of the ASN's organization (the French nuclear safety authority) and its basic missions (regulation elaboration, decisions, control of nuclear activities and installations, public information), the author presents the Bordeaux ASN's department which is in charge of the south-western part of France. He indicates and comments some data illustrating the performed actions and missions. He describes the objectives and procedures of inspection which may depend on the activity (external radiotherapy, interventional radiology, research laboratories). He assesses theses inspections in terms of radioprotection organization, of risk assessment and of definition of regulated areas, of personnel classification and dosimetric follow-on, of training of exposed personnel, of medical follow-on, of radioprotection control, of training of patients to radioprotection, of source management, and of waste and effluent management

  18. Nonimaging aspects of follow-up in breast cancer reconstruction.

    Science.gov (United States)

    Wood, W C

    1991-09-01

    Follow-up of patients with breast cancer is directed to the early detection of recurrent or metastatic disease and the detection of new primary breast cancer. The survival benefit of early detection is limited to some patients with local failure or new primary tumors. That imaging is not used in follow-up of patients who have had breast cancer reconstruction is related to possible interference with this putative benefit by the reconstructive procedure. Such follow-up is accomplished by the patient's own surveillance, clinical examination, and laboratory testing supplemented by imaging studies. Clinical follow-up trials of women who have undergone breast reconstructive surgery show no evidence that locally recurrent breast carcinoma is masked when compared with follow-up of women who did not undergo reconstructive procedures. Reshaping of the contralateral breast to match the reconstructed breast introduces the possibility of interference with palpation as well as mammographic distortion in some women. This is an uncommon practical problem except when complicated by fat necrosis.

  19. Follow-up care of children suffered from burns

    Directory of Open Access Journals (Sweden)

    Konstantin Aleksandrovich Afonichev

    2015-03-01

    Full Text Available Outcomes of III-VI AB degree burns in children,regardless of the nature of treatment in the acute andrecovery period, are the development of scar contractures and deformities of the joints. However, thecorrect organization of follow-up care and rehabilitation treatment can significantly reduce the severity and facilitates the full recovery of the affected segment. Based on the analysis of their own material, the author defines the early stage of rehabilitation in these patients before full maturation of scar tissue or before the formation of functionally significant joint contractures, and later period, when there are indications for surgical rehabilitation. In the early period, follow-up care is recommended in 1 month after discharge and then on a quarterly basis, and with the appearance of deformities - at least once in 2 months. At the2nd stage of rehabilitation, older children and children of secondary school age are subject to follow-up care at least 1 time per year of primary school age - atleast once in 6 months, preschool children - every3 months. The proposed assessment of scar tissuehelps to determine the terms of follow-up care. Usingthis scheme of follow-up care and appropriate treatment allowed the author to obtain excellent and goodresults in 87-90 % of cases at the stages of rehabilitaion.

  20. Environmental compliance in the petrochemical industry in the Sarnia area

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-04-01

    In February 2004, the Ontario Ministry of the Environment directed its Environmental SWAT Team to conduct a comprehensive inspection sweep of Sarnia's industrial sector to ensure that all facilities in that region were brought into compliance with environmental legislation. The primary focus was to inspect areas with the potential for future spills or unlawful discharges that could pose risks to human health or the environment. Legislative and regulatory gaps that could allow environmentally unsafe practices to exist at the facilities were also revealed. The inspection sweep involved comprehensive inspections of 35 petrochemical plant's air emissions, water discharges and spill prevention plans. SWAT officers examined waste management, laboratory operations and other areas that must meet environmental legislative requirements. Nearly all of the of facilities inspected during the sweep were found to be in non-compliance with one or more legislative or regulatory requirement. Common deficiencies included: no spill contingency or spill prevention plans; not having a Certificate of Approval for wastewater collection and treatment works or air emission control equipment; altering equipment, systems, processes, or structure contrary to the existing Certificate of Approval; and improper chemical handling, storage and identification. As a result of the inspection, 6 facilities were ordered to develop both a spill prevention plan and a spill contingency plan and 2 facilities were ordered to develop a spill prevention plan. SWAT officers have followed up to ensure that companies have taken appropriate corrective actions. The inspection revealed some of the sound practices undertaken at some facilities, such as containment; monitoring; prevention of discharge of contaminants to air or water; waste water and storm water treatment; contingency planning; and process hazard analysis of all key processes. refs., tabs., figs.

  1. Establishment of an inferior vena cava filter database and interventional radiology led follow-up - retrieval rates and patients lost to follow-up.

    Science.gov (United States)

    Klinken, Sven; Humphries, Charlotte; Ferguson, John

    2017-10-01

    To evaluate the rates of inferior vena cava (IVC) filter retrieval and the number of patient's lost to follow-up, before and after the establishment of an IVC filter database and interventional radiology (inserting physician) led follow-up. On the 1st of June 2012, an electronic interventional radiology database was established at our Institution. In addition, the interventional radiology team took responsibility for follow-up of IVC filters. Data were prospectively collected from the database for all patients who had an IVC filter inserted between the 1st June 2012 and the 31st May 2014. Data on patients who had an IVC filter inserted between the 1st of June 2009 to the 31st of May 2012 were retrospectively reviewed. Patient demographics, insertion indications, filter types, retrieval status, documented retrieval decisions, time in situ, trackable events and complications were obtained in the pre-database (n = 136) and post-database (n = 118) cohorts. Attempted IVC filter retrieval rates were improved from 52.9% to 72.9% (P = 0.001) following the establishment of the database. The number of patients with no documented decision (lost to follow-up) regarding their IVC filter reduced from 31 of 136 (23%) to 0 of 118 patients (P = database group (113 as compared to 137 days, P = 0.129). Following the establishment of an IVC filter database and interventional radiology led follow-up, we demonstrate a significant improvement in the attempted retrieval rates of IVC filters and the number of patient's lost to follow-up. © 2017 The Royal Australian and New Zealand College of Radiologists.

  2. Inspection of disposal canisters components

    International Nuclear Information System (INIS)

    Pitkaenen, J.

    2013-12-01

    This report presents the inspection techniques of disposal canister components. Manufacturing methods and a description of the defects related to different manufacturing methods are described briefly. The defect types form a basis for the design of non-destructive testing because the defect types, which occur in the inspected components, affect to choice of inspection methods. The canister components are to nodular cast iron insert, steel lid, lid screw, metal gasket, copper tube with integrated or separate bottom, and copper lid. The inspection of copper material is challenging due to the anisotropic properties of the material and local changes in the grain size of the copper material. The cast iron insert has some acoustical material property variation (attenuation, velocity changes, scattering properties), which make the ultrasonic inspection demanding from calibration point of view. Mainly three different methods are used for inspection. Ultrasonic testing technique is used for inspection of volume, eddy current technique, for copper components only, and visual testing technique are used for inspection of the surface and near surface area

  3. Strategic environmental safety inspection for the National disposal program. Description of the inspection volume. Documentation for the scoping team

    International Nuclear Information System (INIS)

    2015-01-01

    The Strategic environmental safety inspection for the National disposal program covers the following topics: Legal framework: determination of the requirement for an environmental inspection program, coordination of the scoping team into the overall context; environmental targets; approach for assessment and evaluation of environmental impact, description of the inspection targets for the strategic environmental inspection; consideration of alternatives.

  4. A follow-up of transients. Stage 1

    International Nuclear Information System (INIS)

    Enekull, Aa.; Wallner, B.

    1981-09-01

    A follow-up of the transients of temperature and pressure in the primary pressurized system of a nuclear power plant has been completed for the Barsebaeck-1 reactor. The investigation consists of the following steps:- the collation of transients - drawing up load data based on transients-analyses of stress - recommendations for future programs. It was found that the lifetime of the system will exceed 40 years excluding some of the pipes for feed water. The appendices give a detailed description of the transients.(G.B.)

  5. Automated PCB Inspection System

    Directory of Open Access Journals (Sweden)

    Syed Usama BUKHARI

    2017-05-01

    Full Text Available Development of an automated PCB inspection system as per the need of industry is a challenging task. In this paper a case study is presented, to exhibit, a proposed system for an immigration process of a manual PCB inspection system to an automated PCB inspection system, with a minimal intervention on the existing production flow, for a leading automotive manufacturing company. A detailed design of the system, based on computer vision followed by testing and analysis was proposed, in order to aid the manufacturer in the process of automation.

  6. Nurse-led telephone follow-up after total knee arthroplasty

    DEFF Research Database (Denmark)

    Szöts, Kirsten; Konradsen, Hanne; Solgaard, Søren

    2015-01-01

    AIM AND OBJECTIVES: To generate information on how telephone follow-up consultations, structured by nursing status according to the VIPS-model, functioned after total knee arthroplasty. The objectives were to unfold the content of the telephone follow-ups according to the structure for nursing...... status and to explore the patients' views of the telephone follow-ups. BACKGROUND: The length of stay in hospital following total knee arthroplasty has fallen markedly, and patients now have to be responsible for their recovery from a very early stage. After discharge, patients may experience a variety...... Telephone follow-up was valued by total knee arthroplasties patients as representing a holistic approach and providing adequate information, counselling and support after discharge to home. Three categories were identified with regard to the patients' views: 'A means for reflection and provision of adequate...

  7. Comparison of sampling strategies for tobacco retailer inspections to maximize coverage in vulnerable areas and minimize cost.

    Science.gov (United States)

    Lee, Joseph G L; Shook-Sa, Bonnie E; Bowling, J Michael; Ribisl, Kurt M

    2017-06-23

    In the United States, tens of thousands of inspections of tobacco retailers are conducted each year. Various sampling choices can reduce travel costs, emphasize enforcement in areas with greater non-compliance, and allow for comparability between states and over time. We sought to develop a model sampling strategy for state tobacco retailer inspections. Using a 2014 list of 10,161 North Carolina tobacco retailers, we compared results from simple random sampling; stratified, clustered at the ZIP code sampling; and, stratified, clustered at the census tract sampling. We conducted a simulation of repeated sampling and compared approaches for their comparative level of precision, coverage, and retailer dispersion. While maintaining an adequate design effect and statistical precision appropriate for a public health enforcement program, both stratified, clustered ZIP- and tract-based approaches were feasible. Both ZIP and tract strategies yielded improvements over simple random sampling, with relative improvements, respectively, of average distance between retailers (reduced 5.0% and 1.9%), percent Black residents in sampled neighborhoods (increased 17.2% and 32.6%), percent Hispanic residents in sampled neighborhoods (reduced 2.2% and increased 18.3%), percentage of sampled retailers located near schools (increased 61.3% and 37.5%), and poverty rate in sampled neighborhoods (increased 14.0% and 38.2%). States can make retailer inspections more efficient and targeted with stratified, clustered sampling. Use of statistically appropriate sampling strategies like these should be considered by states, researchers, and the Food and Drug Administration to improve program impact and allow for comparisons over time and across states. The authors present a model tobacco retailer sampling strategy for promoting compliance and reducing costs that could be used by U.S. states and the Food and Drug Administration (FDA). The design is feasible to implement in North Carolina. Use of

  8. INSPECT: a package of computer programs for planning and evaluating safeguards inspections

    International Nuclear Information System (INIS)

    Mullen, M.F.

    1980-01-01

    As part of the US Program of Technical Assistance to IAEA Safeguards, PNL has developed a package of computer programs, called INSPECT, that can be used in planning and evaluating safeguards inspections of various types of nuclear facilities. The programs are based on the statistical methods described in Part F of the IAEA Safeguards Technical Manual and can be used to calculate the variance components of the MUF (Material Unaccounted For) statistic, the variance components of the D (difference) statistic, attribute and variables sampling plans, and a measure of the effectiveness of the inspection plan. The paper describes the programs, reviews a number of applications, and indicates areas for future work

  9. Autonomous navigation system for mobile robots of inspection; Sistema de navegacion autonoma para robots moviles de inspeccion

    Energy Technology Data Exchange (ETDEWEB)

    Angulo S, P. [ITT, Metepec, Estado de Mexico (Mexico); Segovia de los Rios, A. [ININ, 52045 Ocoyoacac, Estado de Mexico (Mexico)]. e-mail: pedrynteam@hotmail.com

    2005-07-01

    One of the goals in robotics is the human personnel's protection that work in dangerous areas or of difficult access, such it is the case of the nuclear industry where exist areas that, for their own nature, they are inaccessible for the human personnel, such as areas with high radiation level or high temperatures; it is in these cases where it is indispensable the use of an inspection system that is able to carry out a sampling of the area in order to determine if this areas can be accessible for the human personnel. In this situation it is possible to use an inspection system based on a mobile robot, of preference of autonomous navigation, for the realization of such inspection avoiding by this way the human personnel's exposure. The present work proposes a model of autonomous navigation for a mobile robot Pioneer 2-D Xe based on the algorithm of wall following using the paradigm of fuzzy logic. (Author)

  10. Automatic examination of nuclear reactor vessels with focused search units. Status and typical application to inspections performed in accordance with ASME code

    International Nuclear Information System (INIS)

    Verger, B.; Saglio, R.

    1981-05-01

    The use of focused search units in nuclear reactor vessel examinations has significantly increased the capability of flaw indication detection and characterization. These search units especially allow a more accurate sizing of indications and a more efficient follow up of their history. In this aspect, they are a unique tool in the area of safety and reliability of installations. It was this type of search unit which was adopted to perform the examinations required within the scope of inservice inspections of all P.W.R. reactors of the French nuclear program. This paper summarizes the results gathered through the 4l examinations performed over the last five years. A typical application of focused search units in automated inspections performed in accordance with ASME code requirements on P.W.R. nuclear reactor vessels is then described

  11. Compliance with follow-up after cataract surgery in rural China.

    Science.gov (United States)

    Huang, Guofu; Crooms, Rita; Chen, Qianyun; Congdon, Nathan; He, Mingguang

    2012-04-01

    To evaluate reasons for non-compliance with post-cataract surgical follow-up in rural China, and assess the impact of incentives on improving compliance. Patients having undergone cataract surgery more than 3 months previously at cataract surgery training hospitals in Guangdong were invited by telephone and advertisements to a hospital-based study examination, with compensation for travel costs (US$7). Information on prior post-surgical follow up was collected by questionnaire at the hospital or by telephone. Logistic regression was used to assess predictors of post-operative attendance with or without compensation. Among 518 eligible patients, 426 (82.2%) underwent interviews and 342 (66.0%) attended the compensated study examination. Ninety nine participants (23.2%) reported previously returning for uncompensated follow-up ≥ 3 months post-operatively, and 225 (52.8%) had returned for any prior post-operative examination. Uncompensated follow-up at ≥ 3 months was associated with higher income (P = 0.037), and recalling instruction by a doctor to follow-up (P = 0.001), while age, gender, travel cost, and post-operative satisfaction and vision were not associated. Younger (P = 0.002) patients and those reporting being instructed to follow up (P = 0.008) were more likely to return for the compensated research examination. Among all interviewed subjects, only 170 (39.9%) reported knowing they were to return to hospital. Modest compensation, advertisements and telephone contact can increase medium-term follow-up rates after cataract surgery by three-fold. Better communication of specific targets for follow-up may improve follow-up compliance.

  12. Long-term follow-up of echolalia and question answering.

    OpenAIRE

    Foxx, R M; Faw, G D

    1990-01-01

    A long-term follow-up of echolalia and correct question answering was conducted for 6 subjects from three previously published studies. The follow-up periods ranged from 26 to 57 months. In a training site follow-up, subjects were exposed to baseline/posttraining conditions in which the original trainer and/or a novel person(s) presented trained and untrained questions. Four subjects displayed echolalia below baseline levels, and another did so in some assessments. Overall, echolalia was lowe...

  13. Studies of neurosonographic follow up images in intracranial cysts of neonat

    International Nuclear Information System (INIS)

    Oh, Ki Keun; Kim, Kyo Yun; Suh, Jung Ho; Lee, Chul

    1988-01-01

    Total 28 cases of intracranial cysts of high risk neonates were taken neurosonographic follow up study among 210 cases which has been done since April, 1986 through August, 1987. The results were as follows: 1. Intracranial cysts occurred in 28 cases among 210 high risk neonates taken on neurosonography. 2. There were no differences depending on sex of patients or the maturity of neonates. 3. 8 cases among 28 cases had intracranial cysts which were developed at previous hemorrhage sites and most cysts (6/8 cases) were developed on higher grade ICH, with which the higher grade of hemorrhage the much more enlarged and the more prolongation in cyst absorption. 4. 20 cases had developed cysts with no evidence of hemorrhage on initial neurosonography who had respiratory problem (4), sepsis (3), meningitis (1) and perinatal asphyxia (6) as other reports. 5. Subependymal area was the most common location of cysts (25/28 cases). 6. In following up the serial neurosonograms, the degree of resorption and remaining sequelae were different depending on the causes of size and location on cysts. Most of the smaller cysts less than 5mm were resolved in between 60-90 days. 7. The cysts resulted from initial ICH developed usually 7 days after, with findings of central echolucency, which followed by a thinner cyst wall. The smaller cysts resulted from non hemorrhagic origin and had the same progression in resolution. 8. In one case with perinatal asphyxia, the patient had similar ultrasonographic findings of brain edema initially which was followed by U/S manifestation of mixed echogenicity in the brain parenchyme with obliteration of gyrus and sulici in 1 week. Thereafter which was turned to multiple septated cystic leukoencephalomalacia in the 3 weeks follow up study

  14. Studies of neurosonographic follow up images in intracranial cysts of neonat

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Ki Keun; Kim, Kyo Yun; Suh, Jung Ho; Lee, Chul [College of Medicine, Yonsei University, Seoul (Korea, Republic of)

    1988-02-15

    Total 28 cases of intracranial cysts of high risk neonates were taken neurosonographic follow up study among 210 cases which has been done since April, 1986 through August, 1987. The results were as follows: 1. Intracranial cysts occurred in 28 cases among 210 high risk neonates taken on neurosonography. 2. There were no differences depending on sex of patients or the maturity of neonates. 3. 8 cases among 28 cases had intracranial cysts which were developed at previous hemorrhage sites and most cysts (6/8 cases) were developed on higher grade ICH, with which the higher grade of hemorrhage the much more enlarged and the more prolongation in cyst absorption. 4. 20 cases had developed cysts with no evidence of hemorrhage on initial neurosonography who had respiratory problem (4), sepsis (3), meningitis (1) and perinatal asphyxia (6) as other reports. 5. Subependymal area was the most common location of cysts (25/28 cases). 6. In following up the serial neurosonograms, the degree of resorption and remaining sequelae were different depending on the causes of size and location on cysts. Most of the smaller cysts less than 5mm were resolved in between 60-90 days. 7. The cysts resulted from initial ICH developed usually 7 days after, with findings of central echolucency, which followed by a thinner cyst wall. The smaller cysts resulted from non hemorrhagic origin and had the same progression in resolution. 8. In one case with perinatal asphyxia, the patient had similar ultrasonographic findings of brain edema initially which was followed by U/S manifestation of mixed echogenicity in the brain parenchyme with obliteration of gyrus and sulici in 1 week. Thereafter which was turned to multiple septated cystic leukoencephalomalacia in the 3 weeks follow up study.

  15. Audit Follow-up Tracking System (AFTS)

    Data.gov (United States)

    Office of Personnel Management — The Audit Follow-up Tracking System (AFTS) is used to track, monitor, and report on audits and open recommendations of the U.S. Office of Personnel Management (OPM)...

  16. Barrett's esophagus. Diagnosis, follow-up and treatment

    DEFF Research Database (Denmark)

    Bremholm, Lasse; Funch-Jensen, Peter; Eriksen, Jan

    2012-01-01

    gastroesophageal junction. The extent of the endoscopic findings is described by the Prague classification. The metaplasia is histologically confirmed by the presence of intestinal metaplasia. The diagnosis of BE can only be made by a combined macroscopic and microscopic examination. The histological description...... and it is not recommended outside controlled studies. Treatment of high grade dysplasia and carcinoma in situ is handled in departments treating esophageal cancer. Follow-up with endoscopy and biopsy can be offered. Follow-up endoscopy with biopsy can only be recommended after thorough information to the patients...

  17. Secondary Alveolar Bone Grafting in Patients Born With Unilateral Cleft Lip and Palate: A 20-Year Follow-up.

    Science.gov (United States)

    Jabbari, Fatemeh; Wiklander, Laila; Reiser, Erika; Thor, Andreas; Hakelius, Malin; Nowinski, Daniel

    2018-02-01

    To identify factors of oral health important for the final outcome, after secondary alveolar bone grafting in patients born with unilateral cleft lip and palate and compare occlusal radiographs with cone beam computed tomography (CBCT) in assessment of alveolar bone height. Observational follow-up study. Cleft Lip and Palate Team, Craniofacial Center, Uppsala University Hospital, Sweden. 40 nonsyndromic, Caucasian patients with unilateral complete cleft lip and palate. Clinical examination, CBCT, and occlusal radiographs. Alveolar bone height was evaluated according to Bergland index at a 20-year follow-up. The alveolar bone height in the cleft area was significantly reduced compared to a previously reported 10-year follow-up in the same cohort by total ( P = .045) and by subgroup with dental restoration ( P = .0078). This was positively correlated with the gingival bleeding index (GBI) ( r = 0.51, P = .0008) and presence of dental restorations in the cleft area ( r = 0.45, P = .0170). There was no difference in the Bergland index generated from scoring the alveolar bone height on occlusal radiographs as with the equivalent index on CBCT. Patients rehabilitated with complex dental restoration seems to be at higher risk for progression of bone loss in the cleft area. Supportive periodontal therapy should be implemented after complex dental restorations in cleft patients. Conventional occlusal radiographs provide an adequate image for evaluating postoperative bone height in clinical follow-up.

  18. Inspection of the brazilian nuclear regulatory body in the area of radiotherapy. A critical analysis; Inspecao do orgao regulador nuclear brasileiro na area de radioterapia. Uma analise critica

    Energy Technology Data Exchange (ETDEWEB)

    Brito, Ricardo Roberto de Azevedo

    2005-07-01

    The National Commission of Nuclear Energy (CNEN) is responsible in Brazil for the activities of licensing and control of radioactive installations in the radiotherapy medical area. The majority of these activities are developed by CNEN Co-ordination of Radioactive Installations (CORAD). One of the necessary stages for the development of licensing and control activities is the inspection of radiotherapy services (clinics and hospitals). Almost all of these inspections are carried out by CNEN Inst. of Radiation Protection and Dosimetry (IRD), through its Service of Medical Physics in Radiotherapy and Nuclear Medicine (SEFME). This work makes a survey of the main nonconformities found during ten years of inspections in radiotherapy services (1995 - 2004) and analyses the efficiency of these inspections in making the radiotherapy services develop their activities according to the norms in vigour in the country and adopt corrective actions against, at least, the nonconformities evidenced by CNEN inspectors. Additionally, it analyses the possibility of improvement and / or the optimisation of the process, through a procedure able to be unified and controlled, aiming a prompt communication to those involved in the licensing process (SEFME and CORAD) about the attendance by the radiotherapy services to the non-conformity items observed during the inspection. (author)

  19. International cooperation in production inspections

    International Nuclear Information System (INIS)

    Limousin, S.

    2009-01-01

    Nuclear pressure equipment, like the reactor pressure vessel or steam generators, are manufactured in many countries all around the world. As only few reactors were built in the 90's, most of the nuclear safety authorities have lost part of their know how in component manufacturing oversight. For these two reasons, vendor inspection is a key area for international cooperation. On the one hand, ASN has bilateral relationships with several countries (USA, Finland, China...) to fulfill specific purposes. On the other hand, ASN participates in international groups like the MDEP ( Multinational Design Evaluation Program). A MDEP working group dedicated to vendor inspection cooperation enables exchanges of informations (inspection program plan, inspection findings...) among the regulators. Join inspections are organized. International cooperation could lead in the long term to an harmonization of regulatory practices. (author)

  20. Usability improvement of x-ray food inspection equipment

    International Nuclear Information System (INIS)

    Ohira, Norihiro; Yamaguchi, Takashi; Ohara, Mamoru; Shimizu, Hideaki; Kamimura, Kunio; Saiki, Hideo

    2010-01-01

    To properly set up X-ray inspection equipment of foreign bodies in foods properly has become more and more complicated and time-consuming, because digital image processing used in it has more parameters for more precise inspecting. In this paper, it is reported some methods to lighten the work load of workers who set up the parameters. Using Statistical methods, we construct an auto setting lookup table for adjusting contrast and parameters of inspection algorithm. With the former we confirmed an expansion of a range of grey levels that include domain of foreign bodies in sample data. Furthermore, with we constructed in our former research, we can set automatically limit of parameters that judge input product's image to be not including foreign bodies. It is suitable for food inspection system, since users prefer severely inspecting of foreign products. (author)

  1. Magnetic resonance imaging in follow-up assessment of sciatica.

    Science.gov (United States)

    el Barzouhi, Abdelilah; Vleggeert-Lankamp, Carmen L A M; Lycklama à Nijeholt, Geert J; Van der Kallen, Bas F; van den Hout, Wilbert B; Jacobs, Wilco C H; Koes, Bart W; Peul, Wilco C

    2013-03-14

    Magnetic resonance imaging (MRI) is frequently performed during follow-up in patients with known lumbar-disk herniation and persistent symptoms of sciatica. The association between findings on MRI and clinical outcome is controversial. We studied 283 patients in a randomized trial comparing surgery and prolonged conservative care for sciatica and lumbar-disk herniation. Patients underwent MRI at baseline and after 1 year. We used a 4-point scale to assess disk herniation on MRI, ranging from 1 for "definitely present" to 4 for "definitely absent." A favorable clinical outcome was defined as complete or nearly complete disappearance of symptoms at 1 year. We compared proportions of patients with a favorable outcome among those with a definite absence of disk herniation and those with a definite, probable, or possible presence of disk herniation at 1 year. The area under the receiver-operating-characteristic (ROC) curve was used to assess the prognostic accuracy of the 4-point scores regarding a favorable or unfavorable outcome, with 1 indicating perfect discriminatory value and 0.5 or less indicating no discriminatory value. At 1 year, 84% of the patients reported having a favorable outcome. Disk herniation was visible in 35% with a favorable outcome and in 33% with an unfavorable outcome (P=0.70). A favorable outcome was reported in 85% of patients with disk herniation and 83% without disk herniation (P=0.70). MRI assessment of disk herniation did not distinguish between patients with a favorable outcome and those with an unfavorable outcome (area under ROC curve, 0.48). MRI performed at 1-year follow-up in patients who had been treated for sciatica and lumbar-disk herniation did not distinguish between those with a favorable outcome and those with an unfavorable outcome. (Funded by the Netherlands Organization for Health Research and Development and the Hoelen Foundation; Controlled Clinical Trials number, ISRCTN26872154.).

  2. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    International Nuclear Information System (INIS)

    2012-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

  3. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2012-02-21

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

  4. POST-CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 92: AREA 6 DECON POND FACILITY, NEVADA TEST SITE, NEVADA FOR CALENDAR YEAR 2005

    International Nuclear Information System (INIS)

    2006-01-01

    This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility, Nevada Test Site, Nevada. CAU 92 was closed in accordance with the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection (NDEP), 1995) and the Federal Facility Agreement and Consent Order of 1996. Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by the NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs): CAS 06-04-01, Decon Pad Oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in]) in a 24-hour period. This report covers calendar year 2005. Quarterly site inspections were performed in March, June, September, and December of 2005. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A. Five additional inspections were performed after precipitation events that exceeded 1.28 cm (0.50 in) within a 24-hour period during 2005. No significant changes in site conditions were noted during these inspections, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A. Precipitation records for 2005 are included in Appendix C

  5. Towards increasing the utility of follow-up in Canadian EIA

    International Nuclear Information System (INIS)

    Noble, Bram; Storey, Keith

    2005-01-01

    The importance of follow-up in the EIA process is clearly recognized in the Canadian Environmental Assessment Act (Act) in which, where it is considered appropriate, the responsible authority for a project will design a follow-up program and ensure its implementation. The Act is also explicit in recommending that the results of follow-up programs be used to improve the quality of environmental assessments (EAs). The purpose of this paper is to examine whether the specific requirements for follow-up under the Act in fact provide the best opportunity for such quality improvements. The definition of follow-up under the Act requires the verification of the accuracy of the environmental assessment and determination of the effectiveness of measures taken to mitigate the adverse environmental effects of a project. We argue that the Act, generally, and the requirements for follow-up specifically, adopts a negative perspective towards project effects by focusing on the mitigation of adverse effects and discourages the follow-up of important social or economic effects which are independent of project-related changes to the biophysical environment. Secondly, we argue that verification of accuracy places an unwarranted emphasis on 'what was expected' rather than on 'what was wanted' in terms of environmental outcomes. Using examples from Canadian experience, we illustrate the limitations of the current approach to follow-up and suggest that greater utility would be achieved by focusing on whether the environmental objectives of the project in question have been achieved

  6. Follow-up methods for retrospective cohort studies in New Zealand.

    Science.gov (United States)

    Fawcett, Jackie; Garrett, Nick; Bates, Michael N

    2002-01-01

    To define a general methodology for maximising the success of follow-up processes for retrospective cohort studies in New Zealand, and to illustrate an approach to developing country-specific follow-up methodologies. We recently conducted a cohort study of mortality and cancer incidence in New Zealand professional fire fighters. A number of methods were used to trace vital status, including matching with records of the New Zealand Health Information Service (NZHIS), pension records of Work and Income New Zealand (WINZ), and electronic electoral rolls. Non-electronic methods included use of paper electoral rolls and the records of the Registrar of Births Deaths and Marriages. 95% of the theoretical person-years of follow-up of the cohort were traced using these methods. In terms of numbers of cohort members traced to end of follow-up, the most useful tracing methods were fire fighter employment records, the NZHIS, WINZ, and the electronic electoral rolls. The follow-up process used for the cohort study was highly successful. On the basis of this experience, we propose a generic, but flexible, model for follow-up of retrospective cohort studies in New Zealand. Similar models could be constructed for other countries. Successful follow-up of cohort studies is possible in New Zealand using established methods. This should encourage the use of cohort studies for the investigation of epidemiological issues. Similar models for follow-up processes could be constructed for other countries.

  7. Periodical inspection in nuclear power stations

    International Nuclear Information System (INIS)

    1986-01-01

    Periodical inspection is presently being made of eight nuclear power plants in nuclear power stations. Up to the present time, in three of them, failures as follows have been observed. (1) Unit 3 (PWR) of the Mihama Power Station in The Kansai Electric Power Co., Inc. Nineteen heat-transfer tubes of the steam generators were plugged up due to failure. A fuel assembly with a failed spring fixture and in another the control-rod cluster with a failed control rod fixture were replaced. (2) Unit 2 (PWR) of the Oi Power Station in The Kansai Electric Power Co., Inc. Eight heat-transfer tubes of the heat exchangers were plugged up due to failure. (3) Unit 6 (BWR) of the Fukushima Nuclear Power Station I in The Tokyo Electric Power Co., Inc. A fuel assembly with leakage was replaced. (Mori, K.)

  8. Recent Ultrasonic Guided Wave Inspection Development Efforts

    International Nuclear Information System (INIS)

    Rose, Joseph L.; Tittmann, Bernhard R.

    2001-01-01

    The recognition of such natural wave guides as plates, rods, hollow cylinders, multi-layer structures or simply an interface between two materials combined with an increased understanding of the physics and wave mechanics of guided wave propagation has led to a significant increase in the number of guided wave inspection applications being developed each year. Of primary attention Is the ability to inspect partially hidden structures, hard to access areas, and treated or insulated structures. An introduction to some physical consideration of guided waves followed by some sample problem descriptions in pipe, ice detection, fouling detection in the foods industry, aircraft, tar coated structures and acoustic microscopy is presented in this paper. A sample problem in Boundary Element Modeling is also presented to illustrate the move in guided wave analysis beyond detection and location analysis to quantification

  9. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  10. Long-term follow-up results of percutaneous balloon mitral valvuloplasty in mitral stenosis with severe pulmonary hypertension

    International Nuclear Information System (INIS)

    Hu Haibo; Jiang Shiliang; Dai Ruping; Huang Lianjun; Xu Zhongying; Zhao Shihua; Zheng Hong; Ling Jian; Xie Ruolan

    2002-01-01

    Objective: To assess long-term results (more than 5-year) after percutaneous balloon mitral valvuloplasty (PBMV) on mitral stenosis (MS) with severe pulmonary hypertension. Methods: Thirty patients after PBMV underwent critical evaluations including echocardiography, chest film and clinical status throughout the follow-up period (6.4 +- 1.4 years). Results: Before and after PBMV and at follow-up, mean mitral valve areas were (1.19 +- 0.32) cm 2 vs (1.99 +- 0.45) cm 2 vs (1.44 +- 0.42) cm 2 respectively (P<0.01 respectively). Restenosis rate was 53.3% at the end of follow-up. There were twenty-eight (93.3%) patients who obtained at least I class (NYHA class) improvement in cardiac function shortly after PBMV. At the end of follow-up, twenty-two (73.3%) patients were still in class I or II without mitral re-operation or repeated valvuloplasty. Conclusions: Long-term follow-up results after PBMV in mitral stenosis with severe pulmonary hypertension was satisfied, and PBMV can be an excellent therapy to improve the clinical status of such patients

  11. Quality assurance inspections for shipping and storage containers

    Energy Technology Data Exchange (ETDEWEB)

    Stromberg, H.M.; Roberts, G.D.; Bryce, J.H. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)

    1996-04-01

    This is a guide for conducting quality assurance inspections of transportation packaging and dry spent fuel storage system suppliers. (Suppliers are defined as designers, fabricators, distributors, users or owners of those packaging and storage systems.) This guide may be used during inspection to determine regulatory compliance with 10 CFR, Part 71, Subpart H; 10 CFR, Part 72, Subpart G; 10 CFR, Part 21; and supplier`s quality assurance program commitments. It was developed to provide a structured, consistent approach to inspections. The guidance therein provides a framework for evaluation of transportation packaging and dry spent fuel storage systems quality assurance programs. Inspectors are provided with the flexibility to adapt the methods and concepts to meet inspection requirements for the particular facility. The method used in the guide treats each activity at a facility as a separate performance element and combines the activities within the framework of an ``inspection tree.``The method separates each performance element into several areas for inspection and identifies guidelines, based on regulatory requirements, to qualitatively evaluate each area. This guide also serves as a field manual to facilitate quality assurance inspection activities. This guide replaces an earlier one, NUREG/CR-5717 (Packing Supplier Inspection Guide). This replacement guide enhances the inspection activities for transportation packagings and adds the dry spent fuel storage system quality assurance inspection activities.

  12. Quality assurance inspections for shipping and storage containers

    International Nuclear Information System (INIS)

    Stromberg, H.M.; Roberts, G.D.; Bryce, J.H.

    1996-04-01

    This is a guide for conducting quality assurance inspections of transportation packaging and dry spent fuel storage system suppliers. (Suppliers are defined as designers, fabricators, distributors, users or owners of those packaging and storage systems.) This guide may be used during inspection to determine regulatory compliance with 10 CFR, Part 71, Subpart H; 10 CFR, Part 72, Subpart G; 10 CFR, Part 21; and supplier's quality assurance program commitments. It was developed to provide a structured, consistent approach to inspections. The guidance therein provides a framework for evaluation of transportation packaging and dry spent fuel storage systems quality assurance programs. Inspectors are provided with the flexibility to adapt the methods and concepts to meet inspection requirements for the particular facility. The method used in the guide treats each activity at a facility as a separate performance element and combines the activities within the framework of an ''inspection tree.''The method separates each performance element into several areas for inspection and identifies guidelines, based on regulatory requirements, to qualitatively evaluate each area. This guide also serves as a field manual to facilitate quality assurance inspection activities. This guide replaces an earlier one, NUREG/CR-5717 (Packing Supplier Inspection Guide). This replacement guide enhances the inspection activities for transportation packagings and adds the dry spent fuel storage system quality assurance inspection activities

  13. A mobile robot for remote inspection of radioactive waste

    International Nuclear Information System (INIS)

    Suh, Y. C.; Kim, C. H.; Cho, J. W.; Choi, Y. S.; Kim, S. H.

    2004-01-01

    Tele-operation and remote monitoring techniques are essential and important technologies for the inspection and maintenance of the radioactive waste. A mobile robot has been developed for the application of remote monitoring and inspection of nuclear facilities, where human access is limited because of the high-level radioactive environments. The mobile robot was designed with reconfigurable crawler type of wheels attached on the front and rear side in order to pass through the ditch. The extendable mast, mounted on the mobile robot, car be extended up to 8 m vertically. The robust controller for radiation is designed in focus on electric components to prevent abnormal operation in a highly radioactivated area during reactor operation. This robot system will enhance the reliability of nuclear power facilities, and cope with the unexpected radiation accident

  14. Eddy Currents Inspection of CANDU Steam Generator Tubes using Zetec's ZR-1 Robot. Experience in Romania

    International Nuclear Information System (INIS)

    Scott Hower; Luiza Vladu; Adrian Nichisov; Mihai Cretu

    2006-01-01

    Full text of publication follows: The commercial operation of Unit 1 of Cernavoda NPP started on 2 December, 1996. The unit's reactor type is PHWR-CANDU 6 (electrical capacity 706 MWe), using natural uranium. The nuclear fuel is manufactured in Romania. The Cernavoda nuclear power plant has four CANDU - design steam generators that have been in service since 1996. The paper introduces the new ZR-1 Robot System for Inspection and Maintenance/Repair from Zetec that combines the newest state-of-the-art robotics technology with Zetec experience - based innovation to address the needs for inspection and repair of steam generators. The multipurpose ZR-1 can be easily installed to perform the necessary eddy current inspection and remain installed ready for follow-up maintenance and repair. It has superior technical performances and a modular three axis motion of arm that enables 100% coverage of tube sheet. Automated, repeatable, and precise positioning of tool heads ensures accurate delivery and reducing costly rework and reduces inspection time by 30%. The modular, light weight, and portable design permits easy assembly and disassembly through small openings and it reduces setup/tear down time by 30%. The first deployment of the new ZR-1 Robot was made in September 2004 at the Cernavoda NPP inspection outage. The unit's reactor type is PHWR-CANDU 6 (electrical capacity 706 MWe), using natural uranium; the nuclear fuel is manufactured in Romania. The Cernavoda nuclear power plant Unit 1 has four CANDU - design steam generators that have been in service since 1996. The paper presents also the Zetec's field experience and customer experience with this system. It describes the equipment setup in Cernavoda's steam generators mock-up, functional tests and calibration. Finally, provides details on the execution of the inspection, options for standardizing the inspection techniques and conclusions. (authors)

  15. CRYOTHERAPY FOLLOWING VISUAL INSPECTION WITH ACETIC ACID AND LUGOL'S IODINE (VIA/VILI) IN KHWISERO, WESTERN KENYA: LESSON FROM THE FIELD AFFECTING POLICY AND PRACTICE.

    Science.gov (United States)

    Ngichabe, S K; Muthaura, P N; Murungi, C; Muyoka, J; Omenge, E; Muchiri, L

    2013-10-01

    Cervical cancer can be prevented and mortality/morbidity reduced by early detection and referral. Developing countries are likely to benefit from more cost effective methods of screening and treatment. Visual inspection with acetic acid and Lugol's iodine (VIA/VILI) offers a see and treat solution thus an affordable and efficient way to identify pre-malignant lesions. Immediate treatment with cryotherapy can be offered if pre-malignant lesions are found on visual inspection. Cryotherapyis a simple procedure that is curative for dysplasia; it is likely to benefit cervical dysplasia cases picked early in resource poor settings, however there are several factors that hinder patients' access to this noble technique. Determine hindrances to cryotherapy for patients following positive results of VIA/VILI after referral. Cross sectional Study Khwisero, Western Kenya. Women attending a medical camp, willing to get screened for cervical cancer. One hundred and nine patients were screened; seventy three (66.97%) were negative for VIA/VILI, twenty one (19.26%) were positive and referred for cryotherapy. Reasons for lack of follow up were financial constraints, lack of medical personnel at referral centres and poor access to the referral facilities.19.26% of women identified with positive lesions required intervention. No patient received cryotherapy following referral. There is urgent need for availability of cryotherapy machines and training of personnel who can perform cryotherapy at the primary care level. Regional studies on knowledge attitudes and practices about VIA/VILI and cryotherapy are required to provide reasons for the poor uptake of this procedure.

  16. Post-Closure Inspection Report for Corrective Action Unit 92: Area 6 Decon Pond Facility, Nevada Test Site, Nevada, for Calendar Year 2006

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility. CAU 92 was closed according to the ''Resource Conservation and Recovery Act'' (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection [NDEP], 1995) and the ''Federal Facility Agreement and Consent Order'' (FFACO) of 1996 (FFACO, 1996). Closure activities were completed on February 16, 1999, and the Closure Report (U.S. Department of Energy, Nevada Operations Office, 1999) was approved and a Notice of Completion issued by NDEP on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs), CAS 06-04-01, Decon Pad Oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02 requires post-closure inspections. Visual inspections of the cover and fencing at CAS 06-05-02 are performed quarterly. Additional inspections are conducted if precipitation occurs in excess of 1.28 centimeters (cm) (0.50 inches [in.]) in a 24-hour period. This report covers calendar year 2006. Quarterly site inspections were performed in March, June, September, and December of 2006. All observations indicated the continued integrity of the unit. No issues or concerns were noted, and no corrective actions were necessary. Copies of the inspection checklists and field notes completed during each inspection are included in Appendix A of this report, and photographs taken during the site inspections are included in Appendix B of this report. One additional inspection was performed after a precipitation event that exceeded 1.28 cm (0.50 in.) within a 24-hour period during 2006. No significant changes in site conditions were noted during this inspection, and no corrective actions were necessary. A copy of the inspection checklist and field notes completed during this additional inspection is included in Appendix A of this report. Precipitation records for 2006

  17. A Study on Adherence to Follow-up, Quality of Life, and Associated Factors Among Renal Transplant Recipients in China.

    Science.gov (United States)

    Zhao, L; Yan, J; Yang, G-L; Liu, Y

    Adherence to follow-up is vital for the medical surveillance of the postoperative blood concentration, but relatively little research has examined it, and there is less study on relationships between adherence to follow-up and quality of life (QoL). We investigated the status of adherence to follow-up and QoL and associated factors among kidney transplantation recipients in China. A cross-sectional study with the use of a Kidney Transplantation Recipient's Adherence to Follow-Up Questionnaire and a Quality of Life of Kidney Transplantation Recipients Questionnaire was conducted among 250 kidney transplantation recipients in Changsha, China, from January to March in 2015. The mean score for adherence to follow-up was 54.71 ± 6.46. Time after transplantation was the only factor affecting adherence to follow-up scores (β = -0.210; P adherence to follow-up, economic level, job status, donor source, and original disease affected with QoL. Adherence to follow-up decreases with time after transplantation, and better compliance is associated with better QoL in all areas. Improvements in adherence to follow-up, income and reimbursement, psychologic guidance, and social support may increase QoL of kidney transplantat recipients. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. Long-term follow-up of psilocybin-facilitated smoking cessation.

    Science.gov (United States)

    Johnson, Matthew W; Garcia-Romeu, Albert; Griffiths, Roland R

    2017-01-01

    A recent open-label pilot study (N = 15) found that two to three moderate to high doses (20 and 30 mg/70 kg) of the serotonin 2A receptor agonist, psilocybin, in combination with cognitive behavioral therapy (CBT) for smoking cessation, resulted in substantially higher 6-month smoking abstinence rates than are typically observed with other medications or CBT alone. To assess long-term effects of a psilocybin-facilitated smoking cessation program at ≥12 months after psilocybin administration. The present report describes biologically verified smoking abstinence outcomes of the previous pilot study at ≥12 months, and related data on subjective effects of psilocybin. All 15 participants completed a 12-month follow-up, and 12 (80%) returned for a long-term (≥16 months) follow-up, with a mean interval of 30 months (range = 16-57 months) between target-quit date (i.e., first psilocybin session) and long-term follow-up. At 12-month follow-up, 10 participants (67%) were confirmed as smoking abstinent. At long-term follow-up, nine participants (60%) were confirmed as smoking abstinent. At 12-month follow-up 13 participants (86.7%) rated their psilocybin experiences among the five most personally meaningful and spiritually significant experiences of their lives. These results suggest that in the context of a structured treatment program, psilocybin holds considerable promise in promoting long-term smoking abstinence. The present study adds to recent and historical evidence suggesting high success rates when using classic psychedelics in the treatment of addiction. Further research investigating psilocybin-facilitated treatment of substance use disorders is warranted.

  19. Ten-Year Follow-Up of Endovascular Aneurysm Treatment with Talent Stent-Grafts

    International Nuclear Information System (INIS)

    Pitton, Michael B.; Scheschkowski, Tobias; Ring, Markus; Herber, Sascha; Oberholzer, Katja; Leicher-Dueber, Annegret; Neufang, Achim; Schmiedt, Walther; Dueber, Christoph

    2009-01-01

    The purpose of this study was to evaluate the clinical results, complications, and secondary interventions during long-term follow-up after endovascular aneurysm repair (EVAR) and to investigate the impact of endoleak sizes on aneurysm shrinkage. From 1997 to March 2007, 127 patients (12 female, 115 male; age, 73.0 ± 7.2 years) with abdominal aortic aneurysms were treated with Talent stent-grafts. Follow-up included clinical visits, contrast-enhanced MDCT, and radiographs at 3, 6, and 12 months and then annually. Results were analyzed with respect to clinical outcome, secondary interventions, endoleak rate and management, and change in aneurysm size. There was no need for primary conversion surgery. Thirty-day mortality was 1.6% (two myocardial infarctions). Procedure-related morbidity was 2.4% (paraplegia, partial infarction of one kidney, and inguinal bleeding requiring surgery). Mean follow-up was 47.7 ± 34.2 months (range, 0-123 months). Thirty-nine patients died during follow-up; three of the deaths were related to aneurysm (aneurysm rupture due to endoleak, n = 1; secondary surgical reintervention n = 2). During follow-up, a total of 29 secondary procedures were performed in 19 patients, including 14 percutaneous procedures (10 patients) and 15 surgical procedures (12 patients), including 4 cases with late conversion to open aortic repair (stent-graft infection, n = 1; migration, endoleak, or endotension, n = 3). Overall mean survival was 84.5 ± 4.7 months. Mean survival and freedom from any event was 66.7 ± 4.5 months. MRI depicted significantly more endoleaks compared to MDCT (23.5% vs. 14.3%; P 10% of the aneurysm area were associated with reduced aneurysm shrinkage compared to no endoleaks or <10% endoleaks (Δ at 3 years, -1.8% vs. -12.0%; P < 0.05). In conclusion, endovascular aneurysm treatment with Talent stent-grafts demonstrated encouraging long-term results with moderate secondary intervention rates. Primary occlusion of all aortic side

  20. B Plant treatment, storage, and disposal (TSD) units inspection plan

    International Nuclear Information System (INIS)

    Beam, T.G.

    1996-01-01

    This inspection plan is written to meet the requirements of WAC 173-303 for operations of a TSD facility. Owners/operators of TSD facilities are required to inspection their facility and active waste management units to prevent and/or detect malfunctions, discharges and other conditions potentially hazardous to human health and the environment. A written plan detailing these inspection efforts must be maintained at the facility in accordance with Washington Administrative Code (WAC), Chapter 173-303, ''Dangerous Waste Regulations'' (WAC 173-303), a written inspection plan is required for the operation of a treatment, storage and disposal (TSD) facility and individual TSD units. B Plant is a permitted TSD facility currently operating under interim status with an approved Part A Permit. Various operational systems and locations within or under the control of B Plant have been permitted for waste management activities. Included are the following TSD units: Cell 4 Container Storage Area; B Plant Containment Building; Low Level Waste Tank System; Organic Waste Tank System; Neutralized Current Acid Waste (NCAW) Tank System; Low Level Waste Concentrator Tank System. This inspection plan complies with the requirements of WAC 173-303. It addresses both general TSD facility and TSD unit-specific inspection requirements. Sections on each of the TSD units provide a brief description of the system configuration and the permitted waste management activity, a summary of the inspection requirements, and details on the activities B Plant uses to maintain compliance with those requirements

  1. Pediatric vocal fold immobility: natural history and the need for long-term follow-up.

    Science.gov (United States)

    Jabbour, Jad; Martin, Timothy; Beste, David; Robey, Thomas

    2014-05-01

    IMPORTANCE The clinical course and outcomes of pediatric vocal fold immobility (VFI) vary widely in the literature, and follow-up in these patients varies accordingly. A better understanding of the natural history of pediatric VFI is crucial to improved management. OBJECTIVE To characterize the natural history of pediatric VFI, including symptoms and rates of resolution and surgical intervention. DESIGN, SETTING, AND PARTICIPANTS Retrospective review at an academically affiliated private pediatric otolaryngology practice in a metropolitan area of all patients seen between July 15, 2001, and September 1, 2012, with a diagnosis of complete or partial VFI. After elimination of 92 incomplete or duplicate files, 404 patient records were reviewed for demographic characteristics, etiologies, symptoms, follow-up, resolution, and interventions. Follow-up records were available for 362 patients (89.6%). MAIN OUTCOMES AND MEASURES Resolution of VFI confirmed by repeated laryngoscopy, length of follow-up, and surgical intervention rates. RESULTS Among the 404 patients, left VFI was present in 66.8%, right VFI in 7.9%, and bilateral VFI in 25.3%. Median (range) age at presentation was 2.9 (0-528.1) months. Major etiological categories included cardiac surgery in 68.8%, idiopathic immobility in 21.0%, and neurologic disease in 7.4%. At presentation, 61.4%experienced dysphonia, 54.0%respiratory symptoms, and 49.5%dysphagia. Tracheotomy was performed in 25.7%and gastrostomy in 40.8%. Median (range) duration of follow-up among the 89.6%of patients with follow-up was 17.2 (0.2-173.5) months. Resolution evidenced by laryngoscopy was found in 28.0%, with a median (range) time to resolution of 4.3 (0.4-38.7) months. In patients without laryngoscopic resolution, median follow-up was 26.0 months, and 28.9% reported symptomatic resolution. CONCLUSIONS AND RELEVANCE The natural history of pediatric VFI involves substantial morbidity, with lasting symptoms and considerable rates of surgical

  2. Value of routine timed barium esophagram follow-up in achalasia after myotomy.

    Science.gov (United States)

    Kachala, Stefan S; Rice, Thomas W; Baker, Mark E; Rajeswaran, Jeevanantham; Thota, Prashanthi N; Murthy, Sudish C; Blackstone, Eugene H; Zanoni, Andrea; Raja, Siva

    2018-03-08

    The value of routine timed barium esophagram (TBE) in longitudinal follow-up of achalasia after Heller myotomy is unknown. We prospectively prescribed a yearly follow-up TBE. Purposes were to characterize esophageal emptying over time after myotomy, identify preoperative TBE measures associated with follow-up TBE, and characterize follow-up TBE over time in relationship to reintervention. From March 1995 to April 2013, 635 patients underwent Heller myotomy for achalasia; 559 had at least 1 follow-up TBE. Temporal trends of 1335 follow-up TBEs in all nonreintervention and reintervention patients were assessed. Multivariable longitudinal analysis identified preoperative TBE measures associated with follow-up TBE. On average, TBE height and width at 1 and 5 minutes decreased approximately 50% and 60%, respectively, at first postoperative follow-up, and remained stable or slightly decreased for up to 5 years. Wider TBE width at 5 minutes was associated with greater follow-up TBE height and width at 1 minute. Of 118 patients undergoing reintervention, 64 (57%) had only 1 reintervention, with follow-up TBE returning to that of nonreintervention patients. Patients whose follow-up TBE remained abnormal underwent a further reintervention, some normalizing on subsequent TBE, and some not. Follow-up TBE is valuable postmyotomy, particularly if there is substantial esophageal dilatation preoperatively. Follow-up TBE reassures patients with stable or decreasing TBE measures, permitting decreased follow-up intensity. Reintervention should not be considered a myotomy failure, because a successful, single, nonsurgical reintervention often results in long-term successful palliation. More than 1 reintervention requires intensification of TBE follow-up, facilitating treatment planning. Copyright © 2018 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.

  3. The value of gynecologic cancer follow-up: evidence-based ignorance?

    Science.gov (United States)

    Lajer, Henrik; Jensen, Mette B; Kilsmark, Jannie; Albæk, Jens; Svane, Danny; Mirza, Mansoor R; Geertsen, Poul F; Reerman, Diana; Hansen, Kåre; Milter, Maya C; Mogensen, Ole

    2010-11-01

    To explore the extent of evidence-based data and cost-utility of follow-up after primary treatment of endometrial and ovarian cancer, addressing perspectives of technology, organization, economics, and patients. Systematic literature searches according to the recommendations of the Cochrane Handbook for Systematic Reviews of Interventions were conducted separately for each of the 4 perspectives. In addition, the organizational analysis included a nationwide questionnaire survey among all relevant hospital departments, and the operating costs were calculated. None of the identified studies supported a survival benefit from hospital-based follow-up after completion of primary treatment of endometrial or ovarian cancer. The methods for follow-up were of low technology (gynecologic examination with or without ultrasound examination). Other technologies had poor sensitivity and specificity in detecting recurrence. Small changes in applied technologies and organization lead to substantial changes in costs. Substantial differences especially in frequency and applied methods were found between departments. The literature review did not find evidence that follow-up affects the women's quality of life. The main purpose of follow-up after treatment of cancer is improved survival. Our review of the literature showed no evidence of a positive effect on survival in women followed up after primary treatment of endometrial or ovarian cancer. The conception of follow-up among physicians, patients, and their relatives therefore needs revision. Follow-up after treatment should have a clearly defined and evidence-based purpose. Based on the existing literature, this purpose should presently focus on other end points rather than early detection of relapse and improved survival. These end points could be quality of life, treatment toxicity, and economy.

  4. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  5. Clinical and radiological follow-up examinations following fractures of the Collum mandibulae

    International Nuclear Information System (INIS)

    Guss, K.

    1981-01-01

    All patients presented a fracture of the collum mandibulae, which had occurred between 1 and 10 years before treatment. The patients were exclusively treated conservatively. 57 of 67 patients did not indicate any subjective pain. 10 patients complained about pain and restricted movability. In only 22 cases no pathologic findings were obtained in the clinical follow-up examinations. In 33 patients the roentgenologic follow-up examination led to pathologic findings. Severe complications as disturbance of growth and formation of ankyloses, occurred only in one single case, due to a fracture of the mandibular joint in childhood. (orig./MG) [de

  6. 48 CFR 2427.305-2 - Follow-up by contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...

  7. Do OSHA Inspections Reduce Injuries? A Panel Analysis

    OpenAIRE

    Wayne B. Gray; John T. Scholz

    1991-01-01

    Using data on injuries and OSHA inspections for 6,842 large manufacturing plants between 1979 and 1985, we find evidence that OSHA inspections significantly reduce injuries. This effect comes exclusively from inspections that impose penalties, inspections which do not impose penalties appear to have no effect on injuries. Plants which are inspected (and penalized) in a given year experience a 22 percent decline in their injuries during the following few years. In our sample, total OSHA enforc...

  8. Boiler inspection manipulator for Torness Power Station

    International Nuclear Information System (INIS)

    Carrey, R.T.A.; Playle, M.J.

    1996-01-01

    In-service inspection at Torness Advanced Gas-cooled Reactor is achieved, via penetrations above and below the core area and boilers and through eight circulator penetrations for inspection of the sub-diagrid area. A manipulator is described which can access the area above the reactor core via any of these eight peripheral penetrations. The design and fabrication of the manipulator has led to innovation with a number of possible solutions being tendered. In reactor deployment of the successful design is expected in early 1997. (UK)

  9. Post-Closure Inspection and Monitoring Report for Corrective Action Unit 110: Area 3 WMD U-3ax/bl Crater, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    2006-08-01

    This Post-Closure Inspection and Monitoring Report provides the results and inspections and monitoring for Corrective Action Unit 110: Area 3 Waste Management Division U-3ax/bl Crater, Nevada Test Site, Nevada. This report includes an analysis and summary of the site inpsections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at Corrective Action Unit 110, for the annual period July 2005 thrugh June 2006.

  10. Flexible Visual Quality Inspection in Discrete Manufacturing

    OpenAIRE

    Petković, Tomislav; Jurić, Darko; Lončarić, Sven

    2013-01-01

    Most visual quality inspections in discrete manufacturing are composed of length, surface, angle or intensity measurements. Those are implemented as end-user configurable inspection tools that should not require an image processing expert to set up. Currently available software solutions providing such capability use a flowchart based programming environment, but do not fully address an inspection flowchart robustness and can require a redefinition of the flowchart if a small variation is int...

  11. The Kepler follow-up observation program

    DEFF Research Database (Denmark)

    Gautier...[], T.N.; Batalha, N.M.; Borucki, W. J.

    2010-01-01

    The Kepler Mission was launched on March 6, 2009 to perform a photometric survey of more than 100,000 dwarf stars to search for terrestrial-size planets with the transit technique. Follow-up observations of planetary candidates identified by detection of transit-like events are needed both...

  12. The Preliminary Review for the Cross-Cutting Issues in the US Nuclear Regulatory Inspection Framework

    International Nuclear Information System (INIS)

    Lee, Yong Suk; Jung, Dae Wook; Cho, Nam Chul

    2008-01-01

    The research for the development of risk-informed and performance-based regulatory inspection is ongoing in KINS. In the USNRC, the cross-cutting issue is one of the main components the risk-informed and performance-based regulatory inspection process as shown in figure 1, which is named as ROP (Reactor Oversight Process). The following three cross-cutting areas implicitly affect all of the safety cornerstones in ROP. In this study, the preliminary review for the inspection practices of cross-cutting issues in the US and Korean safety regulatory system were performed. The elements of the cross-cutting issues were recently modified to emphasize the importance of safety culture, and the graded approach was applied for the inspection of cross-cutting issues in USNRC. The graded approach for the inspection of cross-cutting issues will be also needed to Korean safety regulatory system in the future

  13. The Preliminary Review for the Cross-Cutting Issues in the US Nuclear Regulatory Inspection Framework

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Suk; Jung, Dae Wook [Future and Challenges Inc., Seoul (Korea, Republic of); Cho, Nam Chul [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2008-10-15

    The research for the development of risk-informed and performance-based regulatory inspection is ongoing in KINS. In the USNRC, the cross-cutting issue is one of the main components the risk-informed and performance-based regulatory inspection process as shown in figure 1, which is named as ROP (Reactor Oversight Process). The following three cross-cutting areas implicitly affect all of the safety cornerstones in ROP. In this study, the preliminary review for the inspection practices of cross-cutting issues in the US and Korean safety regulatory system were performed. The elements of the cross-cutting issues were recently modified to emphasize the importance of safety culture, and the graded approach was applied for the inspection of cross-cutting issues in USNRC. The graded approach for the inspection of cross-cutting issues will be also needed to Korean safety regulatory system in the future.

  14. In-service inspections of V-230 reactor

    International Nuclear Information System (INIS)

    Prepechal, J.

    1984-01-01

    It is stated that despite certain constraints the configuration of the WWER-440 is such that it allows to make in-service inspections on a fully satisfactory scale. Three factors are discussed whose existence is necessary for the implementation of in-service inspections. The program defining the scale of inspections is satisfactory with regard to the safety and reliability of reactor operation. Its further development must result in reducing time consumption and radiation burden of personnel. Regulations for the implementation and evaluation of inspections represent the weakest link in the system of in-service inspections. At present, various organizations are dealing with the said problem within international cooperation. Equipment for in-service inspections of WWER-440 reactors is relatively good. The most important knowledge is summed up gained from the ten pre-service and in-service inspections of reactors of this type made so far. (Z.M.)

  15. A formula for continued improvement: Audit follow-up

    International Nuclear Information System (INIS)

    Maday, J.H. Jr.

    1989-10-01

    In his book Management Audits, Allan J. Sayle states, ''QA standards stipulate that corrective action, required as a result of performing an audit, be followed up and closed out. There would, indeed, be little point in performing audits, requiring corrective action, or having a QA system at all if the auditee knows that the auditor will never verify that the corrective action has been efficaciously implemented.'' The QA auditor has an obligation to include follow-up in the overall audit planning. All too often the auditor will go to great lengths to plan and perform an audit only to have a recurring finding in the next audit. The proposed corrective action was only promissory and was not designed to stop the problem from recurring or to identify its root cause. Auditors do a disservice to the overall QA program and particularly to the customer when they fail to follow up and verify that an audit corrective action has been effectively implemented. In this paper, the techniques used by the quality assurance auditors at the Pacific Northwest Laboratory (PNL) will be presented. Although PNL is a research and development laboratory, the techniques outlined in this paper could be applied to any industry conducting quality assurance audits. Most important, they provide a formula for continued improvement by assuring that audit follow-up is timely, meaningful, and permanent

  16. Pediatric superficial scald burns--reassessment of our follow-up protocol.

    Science.gov (United States)

    Egro, Francesco M; O'Neill, Jennifer K; Briard, Robert; Cubison, Tania C S; Kay, Alan R; Estela, Catalina M; Burge, Timothy S

    2010-01-01

    The most common pediatric burn injury is a superficial scald. The current follow-up protocol for such burns includes review of the patient at 2 weeks postinjury and then 2 months later. The authors decided to review the protocol to assess the need for this second follow-up. A retrospective study reviewed the case notes of patients younger than 16 years at the time of their injury presenting with a scald over 5% TBSA. The progress of healing and scar development up to 5 years follow-up was assessed. This study showed that scalds healing within 2 weeks following injury rarely became hypertrophic. A prospective study was performed over a 10-month period. All children who suffered a superficial partial-thickness scald injury were included. At the 2-week appointment, the need for further follow-up was predicted. The accuracy of this prediction was assessed 2 months later. This study showed that an experienced member of the burns team could reliably predict at 2-week appointment those children who could be safely discharged with no subsequent need for scar management. This study suggests that it will be safe to modify the follow-up protocol, reducing the number of clinic attendances.

  17. Long-term follow-up of two interventional procedures for achalasia

    International Nuclear Information System (INIS)

    Cheng Yingsheng; Li Minghua; Shang Kezhong

    2005-01-01

    Objective: To observed the long-term follow-up of the two types of interventional procedure for achalasia. Methods: The study cohort was comprised of 140 patients of achalasia including 70 patients treated under fluoroscopy with pneumatic dilation (group A) and 70 with temporary partially covered metal stent dilation (group B). Results: One hundred and forty dilations were performed on the 70 patients of group A with complications of chest pain (n=35), reflux (n=18), and bleeding (n=8); 38 patients of relapsing dysphagia during a 12-month follow-up, and 50 patients out of 60 of recurrent dysphagia during a 36-month follow-up. Seventy partially covered expandable metal stents were temporarily placed in the 70 patients of group B and withdrawn after 3-7 days via gastroscopy with complications of chest pain (n=28), reflux (n=15), and bleeding (n=9); 7 patients out of 70 exhibited dysphagia relapse during a 12-month followup, and 9 out of 58 patients exhibited dysphagia relapse during a 36-month follow-up. All the stents were inserted and withdrawn successfully. The follow-up in groups A-B lasted for 12-96 months. Conclusion: Temporary partially covered metal stent dilation is one of the best methods of interventional procedure for achalasia in long-term follow-up. (authors)

  18. Pipe inspection using the BTX-II. Innovative technology summary report

    International Nuclear Information System (INIS)

    1999-05-01

    The US Department of Energy (DOE) continually seeks safer and more cost-effective remediation technologies for use in the decontamination and decommissioning (D and D) of nuclear facilities. In several of the buildings at the Fernald Site, there is piping that was used to transport process materials. As the demolition of these buildings occur, disposal of this piping has become a costly issue. Currently, all process piping is cut into ten-foot or less sections, the ends of the piping are wrapped and taped to prevent the release of any potential contaminants into the air, and the piping is placed in roll off boxes for eventual repackaging and shipment to the Nevada Test Site (NTS) for disposal. Alternatives that allow for the onsite disposal of process piping are greatly desired due to the potential for dramatic savings in current offsite disposal costs. No means is currently employed to allow for the adequate inspection of the interior of piping, and consequently, process piping has been assumed to be internally contaminated and thus routinely disposed of at NTS. The BTX-II system incorporates a high-resolution micro color camera with lightheads, cabling, a monitor, and a video recorder. The complete probe is capable of inspecting pipes with an internal diameter (ID) as small as 1.4 inches. By using readily interchangeable lightheads, the same system is capable of inspecting piping up to 24 inches in ID. The original development of the BTX system was for inspection of boiler tubes and small diameter pipes for build-up, pitting, and corrosion. However, the system is well suited for inspecting the interior of most types of piping and other small, confined areas. The report describes the technology, its performance, uses, cost, regulatory and policy issues, and lessons learned

  19. Pipe inspection using the pipe crawler. Innovative technology summary report

    International Nuclear Information System (INIS)

    1999-05-01

    The US Department of Energy (DOE) continually seeks safer and more cost-effective remediation technologies for use in the decontamination and decommissioning (D and D) of nuclear facilities. In several of the buildings at the Fernald Site, there is piping that was used to transport process materials. As the demolition of these buildings occur, disposal of this piping has become a costly issue. Currently, all process piping is cut into ten-foot or less sections, the ends of the piping are wrapped and taped to prevent the release of any potential contaminants into the air, and the piping is placed in roll off boxes for eventual repackaging and shipment to the Nevada Test Site (NTS) for disposal. Alternatives that allow for the onsite disposal of process piping are greatly desired due to the potential for dramatic savings in current offsite disposal costs. No means is currently employed to allow for the adequate inspection of the interior of piping, and consequently, process piping has been assumed to be internally contaminated and thus routinely disposed of at NTS. The BTX-II system incorporates a high-resolution micro color camera with lightheads, cabling, a monitor, and a video recorder. The complete probe is capable of inspecting pipes with an internal diameter (ID) as small as 1.4 inches. By using readily interchangeable lightheads, the same system is capable of inspecting piping up to 24 inches in ID. The original development of the BTX system was for inspection of boiler tubes and small diameter pipes for build-up, pitting, and corrosion. However, the system is well suited for inspecting the interior of most types of piping and other small, confined areas. The report describes the technology, its performance, uses, cost, regulatory and policy issues, and lessons learned

  20. Pipe inspection using the pipe crawler. Innovative technology summary report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    The US Department of Energy (DOE) continually seeks safer and more cost-effective remediation technologies for use in the decontamination and decommissioning (D and D) of nuclear facilities. In several of the buildings at the Fernald Site, there is piping that was used to transport process materials. As the demolition of these buildings occur, disposal of this piping has become a costly issue. Currently, all process piping is cut into ten-foot or less sections, the ends of the piping are wrapped and taped to prevent the release of any potential contaminants into the air, and the piping is placed in roll off boxes for eventual repackaging and shipment to the Nevada Test Site (NTS) for disposal. Alternatives that allow for the onsite disposal of process piping are greatly desired due to the potential for dramatic savings in current offsite disposal costs. No means is currently employed to allow for the adequate inspection of the interior of piping, and consequently, process piping has been assumed to be internally contaminated and thus routinely disposed of at NTS. The BTX-II system incorporates a high-resolution micro color camera with lightheads, cabling, a monitor, and a video recorder. The complete probe is capable of inspecting pipes with an internal diameter (ID) as small as 1.4 inches. By using readily interchangeable lightheads, the same system is capable of inspecting piping up to 24 inches in ID. The original development of the BTX system was for inspection of boiler tubes and small diameter pipes for build-up, pitting, and corrosion. However, the system is well suited for inspecting the interior of most types of piping and other small, confined areas. The report describes the technology, its performance, uses, cost, regulatory and policy issues, and lessons learned.

  1. Pipe inspection using the BTX-II. Innovative technology summary report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    The US Department of Energy (DOE) continually seeks safer and more cost-effective remediation technologies for use in the decontamination and decommissioning (D and D) of nuclear facilities. In several of the buildings at the Fernald Site, there is piping that was used to transport process materials. As the demolition of these buildings occur, disposal of this piping has become a costly issue. Currently, all process piping is cut into ten-foot or less sections, the ends of the piping are wrapped and taped to prevent the release of any potential contaminants into the air, and the piping is placed in roll off boxes for eventual repackaging and shipment to the Nevada Test Site (NTS) for disposal. Alternatives that allow for the onsite disposal of process piping are greatly desired due to the potential for dramatic savings in current offsite disposal costs. No means is currently employed to allow for the adequate inspection of the interior of piping, and consequently, process piping has been assumed to be internally contaminated and thus routinely disposed of at NTS. The BTX-II system incorporates a high-resolution micro color camera with lightheads, cabling, a monitor, and a video recorder. The complete probe is capable of inspecting pipes with an internal diameter (ID) as small as 1.4 inches. By using readily interchangeable lightheads, the same system is capable of inspecting piping up to 24 inches in ID. The original development of the BTX system was for inspection of boiler tubes and small diameter pipes for build-up, pitting, and corrosion. However, the system is well suited for inspecting the interior of most types of piping and other small, confined areas. The report describes the technology, its performance, uses, cost, regulatory and policy issues, and lessons learned.

  2. Chronic diseases and mortality among immigrants to Israel from areas contaminated by the Chernobyl disaster: a follow-up study.

    Science.gov (United States)

    Slusky, Danna A; Cwikel, Julie; Quastel, Michael R

    2017-05-01

    To examine six chronic diseases and all-cause mortality among immigrants to Israel from areas contaminated by the Chernobyl accident. The medical data were obtained from the two largest HMOs in Israel. In the assessment of chronic diseases, individuals were divided into three groups: less exposed (n = 480), more exposed (n = 359), and liquidators (n = 45) and in the mortality analysis, into two groups: less exposed (n = 792) and more exposed (n = 590). Compared to the less exposed, adults from the more exposed group had increased odds of respiratory disorders (OR = 2.34, 95% CI 1.21, 4.54) and elevated odds, with borderline significance, of ischemic heart disease (OR = 2.01, 95% CI 0.97, 4.20). In addition, the liquidators had increased odds of hypertension compared to the less exposed (OR = 2.64, 95% CI 1.24, 5.64). The Cox proportional-hazards model indicated no difference in the ratio of all-cause mortality between the exposed groups during the follow up period. Our study, conducted approximately two decades after the accident, suggests that exposure to radionuclides may be associated with increased odds of respiratory disorders and hypertension.

  3. Chilean model for long-term follow-up of phenylketonuria (PKU

    Directory of Open Access Journals (Sweden)

    Verónica Cornejo

    2014-07-01

    Full Text Available Chilean newborn screening program began in 1984 through of a covenant between the National Ministry of Health and the Chilean University through its Institute of Nutrition and Food Technology (INTA with the aim of implementing a pilot study for neonatal detection of phenylketonuria (PKU in Santiago’s central area. In 1989 a program for neonatal diagnosis of PKU and congenital hypothyroidism (HC was initiated by INTA along with Santiago´s occidental health ministry rural area, which covered 20% of newborn population. PKU and HC had an incidence of 1:14,640 and 1:2000 living newborns respectively. These findings allowed the establishment of a favorable cost/benefit ratio which validated the implementation of a program with National character. In 1992 the Chilean Ministry of Health ruled the initiation of PKU and HC newborn screening program and by 1998 the coverage across the country was achieved. INTA is the National Reference Center for confirmation and long term treatment for PKU and HC patients. A follow-up program consists of medical, nutritional, neurological and psychological outcome evaluations as well as periodic biochemical testing in order to guarantee normal patient growth and development. To date 184 children have been diagnosed with classic or moderate PKU, all of them follow a strict monitoring program.

  4. [Health management system in outpatient follow-up of kidney transplantation patients].

    Science.gov (United States)

    Zhang, Hong; Xie, Jinliang; Yao, Hui; Liu, Ling; Tan, Jianwen; Geng, Chunmi

    2014-07-01

    To develop a health management system for outpatient follow-up of kidney transplant patients. Access 2010 database software was used to establish the health management system for kidney transplantation patients in Windows XP operating system. Database management and post-operation follow-up of the kidney transplantation patients were realized through 6 function modules including data input, data query, data printing, questionnaire survey, data export, and follow-up management. The system worked stably and reliably, and the data input was easy and fast. The query, the counting and printing were convenient. Health management system for patients after kidney transplantation not only reduces the work pressure of the follow-up staff, but also improves the efficiency of outpatient follow-up.

  5. Citizen involvement in sustainability-centred environmental assessment follow-up

    International Nuclear Information System (INIS)

    Hunsberger, Carol A.; Gibson, Robert B.; Wismer, Susan K.

    2005-01-01

    In Canada, many project proponents and planners in the public and private sectors are required to forecast and minimize the adverse environmental effects of their undertakings. However, environmental assessments have traditionally been weak in the areas of planning and conducting effective monitoring, encouraging public participation, integrating social and ecological considerations, encouraging environmental rehabilitation and enhancement, and examining cumulative effects of multiple projects. This paper attempts to address these deficiencies together by drawing from theory and practice in citizen-based monitoring, in the interests of sustainable livelihoods, using local knowledge. Informed by case study research in several regions of Canada, the discussion focuses on opportunities for using citizen-based approaches to broad and continuing regional monitoring as a foundation for the project-centred work that is the usual concern of environmental assessment follow-up. Such approaches have advantages beyond the usual expectations of project-centred monitoring and beyond the conventional arguments for increasing local involvement in environmental assessments. However, there are also challenges including those of integrating local and conventional (or scientific) knowledge systems, addressing concerns about the credibility and biases of citizens and project proponents, ensuring attention to broader sustainability goals such as increased stewardship and civility, and developing practical ways of coordinating and funding integrated and participatory monitoring programs. The concluding recommendations call for a dramatically different approach to follow-up activities on the part of private and public project proponents, as well as novel thinking for environmental assessment practitioners

  6. Follow up of Graves' Opthalmopathy after radioiodine therapy

    International Nuclear Information System (INIS)

    Miah, M.S.R.; Paul, A. K.; Rahman, H.A.

    2002-01-01

    Graves' ophthalmopathy may first appear or worsen during or after treatment for hyperthyroidism. We followed up 158 Graves' hyperthyroid patients treated with radioiodine of which 49 had Grave's' ophthalmopathy during presentation in Nuclear Medicine Centre, Khulna during the period from 1995 to 2000. The aim of our study is to see the effect of radioiodine in Graves' ophthalmopathy. All the patients received radioiodine at fixed dose regime ranged from 7 mCi to 12 mCi. The duration of follow up was at least 12 months Graves' ophthalmopathy patients, 4 (4/49 i.e., 8.2%) showed exaggeration of ophthalmopathy and the rest (45/49 i.e., 91.8%) remained unchanged. None of ophthalmopathy developed among any of Graves' hyperthyroid or disappeared after radioiodine treatment during follow up period. From the study we concluded that eye changes in Graves' hyperthyroidism remain unchanged or exaggerated after radioiodine therapy and needs ophthalmologist care.(author)

  7. Identification of areas and time intervals for inservice inspections; Auswahl der Pruefbereiche und -intervalle fuer wiederkehrende Pruefungen

    Energy Technology Data Exchange (ETDEWEB)

    Metzner, K J [Preussische Elektrizitaets-AG (Preussenelektra), Hannover (Germany); Herter, K H [Stuttgart Univ. (Germany). Staatliche Materialpruefungsanstalt; Schoeckle, F [Amtec Messtechnischer Service, Lauffen (Germany)

    1998-11-01

    Inservice inspections are an important, redundant part of the overall concept for ensuring component integrity during NPP operation. Their efficiency however has to be considered in the context of measures creating required component quality (design and manufacture), and inspection and monitoring measures maintaining the quality of components. If an available system for inservice monitoring yields comprehensive information about real inservice loads (monitoring of the causes of degradation), inservice inspections can be designed to purposefully check the possibly resulting damaging modes and defects. If there is no or only low-level monitoring, the possible consequences of possibly damaging mechanisms that may be unknown should be checked by expanded inservice inspections plus, if necessary, unspecific, random inspections. For selection of inspection areas and determination of inspection intervals, use of design-based analyses which take into account conservative, specified loads and load frequencies (for operating modes and incidents) is not recommendable. The recommended approach is to take as a basis information on measured, real inservice loads together with information about the real quality status of components, derived from manufacturing data and service histories. The available information has to be scanned and processed so as to give a basis for new appraisal of hitherto applied NDE methods. (orig./CB) [Deutsch] Wiederkehrende Pruefungen sind ein wichtiger redundanter Teil der Gesamtmassnahmen zur Gewaehrleistung der Komponentenintegritaet waehrend des Betriebes von Kernkraftwerken. Ihre Wirksamkeit muss jedoch in enger Verbindung mit den die Komponentenqualitaet erzeugenden Massnahmen (Auslegung und Herstellung) und den die Komponentenqualitaet erhaltenden Ueberwachungmassnahmen waehrend des Betriebes gesehen werden. Wenn die vorhandene Betriebsueberwachung eine umfassende Kenntnis der bisherigen Betriebsbelastungen ermoeglicht (Ueberwachung der Ursachen

  8. Ultrasonic inspections of fuel alignment pins

    International Nuclear Information System (INIS)

    Rathgeb, W.; Schmid, R.

    1994-01-01

    As a remedy to the practical problem of defects in fuel alignment pins made of Inconel X750, an inspection technique has been developed which fully meets the requirements of detecting defects. The newly used fuel alignment pins made of austenite are easy to test and therefore satisfy the necessity of further inspections.For the fuel alignment pins of the upper core structure a safe and fast inspection technique was made available. The inspection sensitivity is high and it is possible to give quantitative directions concerning defect orientation and depth. After the required inspections had been concluded in 1989, a total of 18 inspections were carried out in various national and international nuclear power plants in the following years. During this time more than 6000 fuel alignment pines were examined.For the fuel alignment pins the inspection technique provided could increase the understanding of the defect process. This technique contributed to the development of an adaptive and economical repair strategy. ((orig.))

  9. Value of early follow-up CT in paediatric tuberculous meningitis

    International Nuclear Information System (INIS)

    Andronikou, Savvas; Wieselthaler, Nicky; Smith, Bruce; Douis, Hassan; Fieggen, A. Graham; Toorn, Ronald van; Wilmshurst, Jo

    2005-01-01

    The value of CT in the diagnosis of tuberculous meningitis (TBM) in children is well reported. Follow-up CT scanning for these patients is, however, not well described and, in particular, the value of early follow-up CT has not been addressed for children with TBM. To assess the value of early follow-up CT in children with TBM in identifying diagnostic, prognostic and therapeutically relevant features of TBM. A retrospective 4-year review of CT scans performed within 1 week and 1 month of initial CT in children with proven (CSF culture-positive) and probable TBM (CSF profile-positive but culture-negative) and comparison with initial CT for the diagnostic, prognostic and therapeutic CT features of TBM. The CT scans of 50 children were included (19 ''definite'' TBM; 31 ''probable'' TBM). Of these, 30 had CT scans performed within 1 week of the initial CT. On initial CT, 44 patients had basal enhancement. Only 24 patients had contrast medium-enhanced follow-up scans. Important findings include: 8 of 29 patients (who were not shunted) developed new hydrocephalus. New infarcts developed in 24 patients; 45% of those who did not have infarction initially developed new infarcts. Three of the six patients who did not show basal enhancement on initial scans developed this on the follow-up scans, while in seven patients with pre-existing basal enhancement this became more pronounced. Two patients developed hyperdensity in the cisterns on non-contrast medium scans. Eight patients developed a diagnostic triad of features. Three patients developed CT features of TBM where there was none on the initial scans. Early follow-up CT is useful in making a diagnosis of TBM by demonstrating features that were not present initially and by demonstrating more sensitive, obvious or additional features of TBM. In addition, follow-up CT is valuable as a prognostic indicator as it demonstrates additional infarcts which may have developed or become more visible since the initial study. Lastly

  10. Value of early follow-up CT in paediatric tuberculous meningitis

    Energy Technology Data Exchange (ETDEWEB)

    Andronikou, Savvas [University of Cape Town, Department of Radiology, Cape Town (South Africa); Wieselthaler, Nicky; Smith, Bruce; Douis, Hassan [Red Cross Children' s Hospital, Department of Paediatric Radiology, School of Child and Adolescent Health, Cape Town (South Africa); Fieggen, A. Graham; Toorn, Ronald van; Wilmshurst, Jo [Red Cross Children' s Hospital, Department of Paediatric Radiology, School of Child and Adolescent Health, Cape Town (South Africa); Red Cross Children' s Hospital, Department of Neurosciences, School of Child and Adolescent Health, Cape Town (South Africa)

    2005-11-01

    The value of CT in the diagnosis of tuberculous meningitis (TBM) in children is well reported. Follow-up CT scanning for these patients is, however, not well described and, in particular, the value of early follow-up CT has not been addressed for children with TBM. To assess the value of early follow-up CT in children with TBM in identifying diagnostic, prognostic and therapeutically relevant features of TBM. A retrospective 4-year review of CT scans performed within 1 week and 1 month of initial CT in children with proven (CSF culture-positive) and probable TBM (CSF profile-positive but culture-negative) and comparison with initial CT for the diagnostic, prognostic and therapeutic CT features of TBM. The CT scans of 50 children were included (19 ''definite'' TBM; 31 ''probable'' TBM). Of these, 30 had CT scans performed within 1 week of the initial CT. On initial CT, 44 patients had basal enhancement. Only 24 patients had contrast medium-enhanced follow-up scans. Important findings include: 8 of 29 patients (who were not shunted) developed new hydrocephalus. New infarcts developed in 24 patients; 45% of those who did not have infarction initially developed new infarcts. Three of the six patients who did not show basal enhancement on initial scans developed this on the follow-up scans, while in seven patients with pre-existing basal enhancement this became more pronounced. Two patients developed hyperdensity in the cisterns on non-contrast medium scans. Eight patients developed a diagnostic triad of features. Three patients developed CT features of TBM where there was none on the initial scans. Early follow-up CT is useful in making a diagnosis of TBM by demonstrating features that were not present initially and by demonstrating more sensitive, obvious or additional features of TBM. In addition, follow-up CT is valuable as a prognostic indicator as it demonstrates additional infarcts which may have developed or become more

  11. Implementation of large area CMOS image sensor module using the precision align inspection

    International Nuclear Information System (INIS)

    Kim, Byoung Wook; Kim, Toung Ju; Ryu, Cheol Woo; Lee, Kyung Yong; Kim, Jin Soo; Kim, Myung Soo; Cho, Gyu Seong

    2014-01-01

    This paper describes a large area CMOS image sensor module Implementation using the precision align inspection program. This work is needed because wafer cutting system does not always have high precision. The program check more than 8 point of sensor edges and align sensors with moving table. The size of a 2×1 butted CMOS image sensor module which except for the size of PCB is 170 mm×170 mm. And the pixel size is 55 μm×55 μm and the number of pixels is 3,072×3,072. The gap between the two CMOS image sensor module was arranged in less than one pixel size

  12. Implementation of large area CMOS image sensor module using the precision align inspection

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Byoung Wook; Kim, Toung Ju; Ryu, Cheol Woo [Radiation Imaging Technology Center, JBTP, Iksan (Korea, Republic of); Lee, Kyung Yong; Kim, Jin Soo [Nano Sol-Tech INC., Iksan (Korea, Republic of); Kim, Myung Soo; Cho, Gyu Seong [Dept. of Nuclear and Quantum Engineering, KAIST, Daejeon (Korea, Republic of)

    2014-12-15

    This paper describes a large area CMOS image sensor module Implementation using the precision align inspection program. This work is needed because wafer cutting system does not always have high precision. The program check more than 8 point of sensor edges and align sensors with moving table. The size of a 2×1 butted CMOS image sensor module which except for the size of PCB is 170 mm×170 mm. And the pixel size is 55 μm×55 μm and the number of pixels is 3,072×3,072. The gap between the two CMOS image sensor module was arranged in less than one pixel size.

  13. Cognitive evolution in hypertensive patients: a six-year follow-up

    Directory of Open Access Journals (Sweden)

    Vicario A

    2011-05-01

    Full Text Available Augusto Vicario1,2,3, Mildren A del Sueldo2,3, Judith M Zilberman2,3, Gustavo H Cerezo2,31Department of Internal Medicine, Cardiovascular Division, Hospital Español de Buenos Aires, Argentina; 2Argentine Federation of Cardiology, (AFC, Buenos Aires, Argentina; 3Research Group, Human Health Commission, CERTUS Foundation, Buenos Aires, Argentina Background: Several studies have examined the links between hypertension, vascular damage, and cognitive impairment. The functions most commonly involved seem to be those associated with memory and executive function.Aims: 1 to report the cognitive evolution in a cohort of hypertensive patients, 2 to identify the affected domains, and 3 to correlate the results obtained with blood pressure measurements.Materials and Methods: Observational 6-year follow-up cohort study including both males and females aged ≥65 and ≤80 years, and hypertensive patients under treatment. Patients with a history of any of the following conditions were excluded: stroke, transient ischemic attack, diabetes mellitus, atrial fibrillation, cardiac surgery, dementia, or depression. Four neurocognitive evaluations were performed (at baseline and every 2 years. The tests used evaluated memory and executive function domain. Blood pressure was measured on every cognitive evaluation.Results: Sixty patients were followed for 76.4 ± 2.8 months. The average age at baseline was 72.5 ± 4.2 and 77.9 ± 4.6 at 6 years (65% were women. Two patients were lost to follow up (3.3% and 8 patients died (13.3%.The density incidence for dementia was 0.6% patients per year (pt/y (n = 3 and for depression was 1.6% pt/y (n = 12. No changes were observed in either memory impairment or the Mini Mental State Examination (MMSE results (p = ns during follow-up. A progressive impairment of the executive function was shown regardless of the blood pressure measurements.Conclusion: 1 the incidence of dementia doubled to general population, 2 the initial memory

  14. 9 CFR 314.7 - Carcasses of livestock condemned on ante-mortem inspection not to pass through edible product areas.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Carcasses of livestock condemned on... DISPOSAL OF CONDEMNED OR OTHER INEDIBLE PRODUCTS AT OFFICIAL ESTABLISHMENTS § 314.7 Carcasses of livestock condemned on ante-mortem inspection not to pass through edible product areas. Carcasses of livestock which...

  15. Eddy current automatic inspection of heat exchangers in nuclear power stations

    International Nuclear Information System (INIS)

    Cazal, M.; Scopelliti, J.D.; Mendez, J.

    1997-01-01

    This presentation describes the eddy current tube inspection techniques for heavy heat exchangers in nuclear power stations. The purpose of these eddy current tests, is first to determine the integrity of the heat exchanger tubes, and to characterize the related types of defects in each case following to their analysis and cause determination and subsequent inspection planning. This task requires a group highly qualified personnel with high tech automate equipment. The organization of the group required a correct function and task assignment in order to achieve efficiency in scheduling, with simultaneous inspection to different components in a continuous base and uninterruptedly. A lead specialist is in charge of the group, which is set up by several shift supervisors, a qualified tele manipulator installation crew a number of qualified tele manipulator operators, and the specialist for data acquisition and certified eddy current signal evaluators plus some other support technicians and administrations helpers. In order to comply with inspection requirements, a bunch of technical procedures had to be developed. The following equipment is available nowadays: Zetec SM-13, SM-23 and SM-22 tele manipulators for inspection probes positioning, with different shapes and configuration (rotating probes, flexible probes for U-Bends, and magnetic saturation probes endowed with their own driving units) and remote data acquisition units identified as MIZ-18 A and MIZ-30, which are remotely operated from a mobile lab installed in a trailer, outside the reactor building. The available equipment allows a simultaneous inspection of three different plant components (two steam generators and a moderator heat exchanger). We are also in a position of performing eddy current tube inspection in more than a NSP at the same time. The Zetec Eddynet software is used in the manipulator operation and for the data acquisition and defect evaluation. This software operates within Windows

  16. Ultrasonic inspection of inpile tubes

    International Nuclear Information System (INIS)

    Boyd, D.M.; Bossi, H.

    1985-01-01

    The in-service inspection (ISI) of inpile tubes can be performed accurately and safely with a semiautomatic ultrasonic inspection system. The ultrasonic technique uses a set of multiple transducers to detect and size cracks, voids, and laminations radially and circumferentially. Welds are also inspected for defects. The system is designed to inspect stainless steel and Inconel tubes ranging from 53.8 mm (2.12 in.) to 101.6 mm (4 in.) inner diameter with wall thickness on the order of 5 mm. The inspection head contains seven transducers mounted in a surface-following device. Six angle-beam transducers generate shear waves in the tubes. Two of the six are oriented to detect circumferential cracks, and two detect axial cracks. Although each of these four transducers is used in the pulse-echo mode, they are oriented in aligned sets so pitch-catch operation is possible if desired. The remaining angle-beam transducers are angulated to detect flaws that are off axial or circumferential orientation. The seventh transducer is used for longitudinal inspection and detects and sizes laminar-type defects

  17. Summary report for 1990 inservice inspection (ISI) of SRS 100-L reactor tank

    International Nuclear Information System (INIS)

    Morrison, J.M.; Loibl, M.W.

    1991-01-01

    The integrity of the SRS reactor tanks is a key factor affecting their suitability for continued service since, unlike the external piping system and components, the tanks are virtually irreplaceable. Cracking in various areas of the process water piping systems has occurred beginning in about 1960 as a result of several degradation mechanisms, chiefly intergranular stress corrosion cracking (IGSCC) and chloride-induced transgranular cracking. The primary objective of this inspection was to determine if the accessible welds and selected portions of base metal in the L Reactor tank wall contain any indications of IGSCC. This inspection included areas in and beyond the weld HAZ, extending out as far as two to three inches from the centerline of the welds, plus selected areas of base metal at the intersection of the main tank vertical and mid-girth welds. No evidence of such degradation was found in any of the areas examined. Further, additional inspections were conducted of areas that had been damaged and repaired during original fabrication, and on a sample of areas containing linear indications observed during the 1986 visual inspection of the tank. No evidence of IGSCC or other service induced degradation was detected in these areas, either. The inspection was initially planned to cover a minimum of 60% of the accessible welds, plus repair areas and a sample of the indications from the 1986 visual inspection. Direction was received from DOE while the inspection was in progress to expand the scope to cover 100% of the accessible weld areas, and the plan was adjusted accordingly. Initial setup of the tank, which prior to inspection contained Mark 60B target assemblies and nearly a full charge of Mark 22 fuel assemblies, began on October 15, 1990. The inspection was completed on April 12, 1991

  18. Screening and Follow-Up Monitoring for Substance Use in Primary Care: An Exploration of Rural-Urban Variations.

    Science.gov (United States)

    Chan, Ya-Fen; Lu, Shou-En; Howe, Bill; Tieben, Hendrik; Hoeft, Theresa; Unützer, Jürgen

    2016-02-01

    Rates of substance use in rural areas are close to those of urban areas. While recent efforts have emphasized integrated care as a promising model for addressing workforce shortages in providing behavioral health services to those living in medically underserved regions, little is known on how substance use problems are addressed in rural primary care settings. To examine rural-urban variations in screening and monitoring primary care- based patients for substance use problems in a state-wide mental health integration program. This was an observational study using patient registry. The study included adult enrollees (n = 15,843) with a mental disorder from 133 participating community health clinics. We measured whether a standardized substance use instrument was used to screen patients at treatment entry and to monitor symptoms at follow-up visits. While on average 73.6 % of patients were screened for substance use, follow-up on substance use problems after initial screening was low (41.4 %); clinics in small/isolated rural settings appeared to be the lowest (13.6 %). Patients who were treated for a mental disorder or substance abuse in the past and who showed greater psychiatric complexities were more likely to receive a screening, whereas patients of small, isolated rural clinics and those traveling longer distances to the care facility were least likely to receive follow-up monitoring for their substance use problems. Despite the prevalent substance misuse among patients with mental disorders, opportunities to screen this high-risk population for substance use and provide a timely follow-up for those identified as at risk remained overlooked in both rural and urban areas. Rural residents continue to bear a disproportionate burden of substance use problems, with rural-urban disparities found to be most salient in providing the continuum of services for patients with substance use problems in primary care.

  19. Electrical and electronic subsystems of a nuclear waste tank annulus inspection system

    International Nuclear Information System (INIS)

    Evenson, R.J.

    1981-06-01

    The nuclear waste tank annulus inspection system is designed specifically for use at the Nuclear Regulatory Commission's Nuclear Fuel Services Facility at West Valley, New York. This system sends a television and photographic camera into the space between the walls of a double-shell nuclear waste tank to obtain images of the inner and outer walls at precisely known locations. The system is capable of inspecting a wall section 14 ft wide by 27 ft high. Due to the high temperature and radiation of the annulus environment, the operating life for the inspection device is uncertain, but is expected to be at least 100 h, with 1000 R/h at 82 0 C. The film camera is shielded with 1/2 in. of lead to minimize radiation fogging of the film during a 25-min picture taking excursion. The operation of the inspection system is semiautomated with remote manual prepositioning of the camera, followed by a computer controlled wall scan. This apparatus is currently set up to take an array of contiguous pictures, but is adaptable to other modes of operation

  20. Follow-up care of young childhood cancer survivors: attendance and parental involvement.

    Science.gov (United States)

    Vetsch, Janine; Rueegg, Corina S; Mader, Luzius; Bergstraesser, Eva; Rischewski, Johannes; Kuehni, Claudia E; Michel, Gisela

    2016-07-01

    Despite recommendations, only a proportion of long-term childhood cancer survivors attend follow-up care. We aimed to (1) describe the follow-up attendance of young survivors aged 11-17 years; (2) describe the parental involvement in follow-up, and (3) investigate predictors of follow-up attendance and parental involvement. As part of the Swiss Childhood Cancer Survivor Study, a follow-up questionnaire was sent to parents of childhood cancer survivors aged 11-17 years. We assessed follow-up attendance of the child, parents' involvement in follow-up, illness perception (Brief IPQ), and sociodemographic data. Clinical data was available from the Swiss Childhood Cancer Registry. Of 309 eligible parents, 189 responded (67 %; mean time since diagnosis 11.3 years, range 6.8-17.2) and 75 % (n = 141) reported that their child still attended follow-up. Of these, 83 % (n = 117) reported ≥1 visit per year and 17 % (n = 23) reported parents (92 %) reported being involved in follow-up (n = 130). In multivariable and Cox regression analyses, longer time since diagnosis (p = 0.025) and lower perceived treatment control (assessed by IPQ4: how much parents thought follow-up can help with late effects; p = 0.009) were associated with non-attendance. Parents' overall information needs was significantly associated with parental involvement in the multivariable model (p = 0.041). Educating survivors and their parents on the importance and effectiveness of follow-up care might increase attendance in the longer term.

  1. Radio Follow-up on All Unassociated Gamma-Ray Sources from the Third Fermi Large Area Telescope Source Catalog

    Energy Technology Data Exchange (ETDEWEB)

    Schinzel, Frank K. [National Radio Astronomy Observatory, P.O. Box O, Socorro, NM 87801 (United States); Petrov, Leonid [Astrogeo Center, Falls Church, VA 22043 (United States); Taylor, Gregory B. [Department of Physics and Astronomy, University of New Mexico, Albuquerque, NM 87131 (United States); Edwards, Philip G., E-mail: fschinze@nrao.edu [CSIRO Astronomy and Space Science, P.O. Box 76, Epping, 1710 NSW (Australia)

    2017-04-01

    The third Fermi Large Area Telescope γ -ray source catalog (3FGL) contains over 1000 objects for which there is no known counterpart at other wavelengths. The physical origin of the γ -ray emission from those objects is unknown. Such objects are commonly referred to as unassociated and mostly do not exhibit significant γ -ray flux variability. We performed a survey of all unassociated γ -ray sources found in 3FGL using the Australia Telescope Compact Array and Very Large Array in the range 4.0–10.0 GHz. We found 2097 radio candidates for association with γ -ray sources. The follow-up with very long baseline interferometry for a subset of those candidates yielded 142 new associations with active galactic nuclei that are γ -ray sources, provided alternative associations for seven objects, and improved positions for another 144 known associations to the milliarcsecond level of accuracy. In addition, for 245 unassociated γ -ray sources we did not find a single compact radio source above 2 mJy within 3 σ of their γ -ray localization. A significant fraction of these empty fields, 39%, are located away from the Galactic plane. We also found 36 extended radio sources that are candidates for association with a corresponding γ -ray object, 19 of which are most likely supernova remnants or H ii regions, whereas 17 could be radio galaxies.

  2. The Fermi GBM and LAT follow-up of GW150914

    Directory of Open Access Journals (Sweden)

    Bissaldi E.

    2017-01-01

    Here we present observations by the Fermi Gamma-Ray BurstMonitor (GBM [1] and by the Large Area Telescope (LAT [2] of the LIGO Gravitational Wave event GW150914, which has been associated to the merger of two stellar-mass BHs. We report the presence of a weak transient event in GBM data, close in time to the LIGO one. We discuss the characteristics of this GBM transient, which are consistent with a weak short GRB arriving at a large angle to the direction in which Fermi was pointing. Furthermore, we report LAT upper limits (ULs for GW150914, and we present the strategy for follow-up observations of GW events with the LAT.

  3. Eddy Currents Inspection of CANDU Steam Generator Tubes using Zetec's ZR-1 Robot. Experience in Romania

    Energy Technology Data Exchange (ETDEWEB)

    Scott Hower [Zetec Inc. (Romania); Luiza Vladu; Adrian Nichisov; Mihai Cretu [COMPCONTROL ING. (Romania)

    2006-07-01

    Full text of publication follows: The commercial operation of Unit 1 of Cernavoda NPP started on 2 December, 1996. The unit's reactor type is PHWR-CANDU 6 (electrical capacity 706 MWe), using natural uranium. The nuclear fuel is manufactured in Romania. The Cernavoda nuclear power plant has four CANDU - design steam generators that have been in service since 1996. The paper introduces the new ZR-1 Robot System for Inspection and Maintenance/Repair from Zetec that combines the newest state-of-the-art robotics technology with Zetec experience - based innovation to address the needs for inspection and repair of steam generators. The multipurpose ZR-1 can be easily installed to perform the necessary eddy current inspection and remain installed ready for follow-up maintenance and repair. It has superior technical performances and a modular three axis motion of arm that enables 100% coverage of tube sheet. Automated, repeatable, and precise positioning of tool heads ensures accurate delivery and reducing costly rework and reduces inspection time by 30%. The modular, light weight, and portable design permits easy assembly and disassembly through small openings and it reduces setup/tear down time by 30%. The first deployment of the new ZR-1 Robot was made in September 2004 at the Cernavoda NPP inspection outage. The unit's reactor type is PHWR-CANDU 6 (electrical capacity 706 MWe), using natural uranium; the nuclear fuel is manufactured in Romania. The Cernavoda nuclear power plant Unit 1 has four CANDU - design steam generators that have been in service since 1996. The paper presents also the Zetec's field experience and customer experience with this system. It describes the equipment setup in Cernavoda's steam generators mock-up, functional tests and calibration. Finally, provides details on the execution of the inspection, options for standardizing the inspection techniques and conclusions. (authors)

  4. Built-Up Area Detection from High-Resolution Satellite Images Using Multi-Scale Wavelet Transform and Local Spatial Statistics

    Science.gov (United States)

    Chen, Y.; Zhang, Y.; Gao, J.; Yuan, Y.; Lv, Z.

    2018-04-01

    Recently, built-up area detection from high-resolution satellite images (HRSI) has attracted increasing attention because HRSI can provide more detailed object information. In this paper, multi-resolution wavelet transform and local spatial autocorrelation statistic are introduced to model the spatial patterns of built-up areas. First, the input image is decomposed into high- and low-frequency subbands by wavelet transform at three levels. Then the high-frequency detail information in three directions (horizontal, vertical and diagonal) are extracted followed by a maximization operation to integrate the information in all directions. Afterward, a cross-scale operation is implemented to fuse different levels of information. Finally, local spatial autocorrelation statistic is introduced to enhance the saliency of built-up features and an adaptive threshold algorithm is used to achieve the detection of built-up areas. Experiments are conducted on ZY-3 and Quickbird panchromatic satellite images, and the results show that the proposed method is very effective for built-up area detection.

  5. Survival analysis with functional covariates for partial follow-up studies.

    Science.gov (United States)

    Fang, Hong-Bin; Wu, Tong Tong; Rapoport, Aaron P; Tan, Ming

    2016-12-01

    Predictive or prognostic analysis plays an increasingly important role in the era of personalized medicine to identify subsets of patients whom the treatment may benefit the most. Although various time-dependent covariate models are available, such models require that covariates be followed in the whole follow-up period. This article studies a new class of functional survival models where the covariates are only monitored in a time interval that is shorter than the whole follow-up period. This paper is motivated by the analysis of a longitudinal study on advanced myeloma patients who received stem cell transplants and T cell infusions after the transplants. The absolute lymphocyte cell counts were collected serially during hospitalization. Those patients are still followed up if they are alive after hospitalization, while their absolute lymphocyte cell counts cannot be measured after that. Another complication is that absolute lymphocyte cell counts are sparsely and irregularly measured. The conventional method using Cox model with time-varying covariates is not applicable because of the different lengths of observation periods. Analysis based on each single observation obviously underutilizes available information and, more seriously, may yield misleading results. This so-called partial follow-up study design represents increasingly common predictive modeling problem where we have serial multiple biomarkers up to a certain time point, which is shorter than the total length of follow-up. We therefore propose a solution to the partial follow-up design. The new method combines functional principal components analysis and survival analysis with selection of those functional covariates. It also has the advantage of handling sparse and irregularly measured longitudinal observations of covariates and measurement errors. Our analysis based on functional principal components reveals that it is the patterns of the trajectories of absolute lymphocyte cell counts, instead of

  6. Meeting increased demand for total knee replacement and follow-up: determining optimal follow-up.

    Science.gov (United States)

    Meding, J B; Ritter, M A; Davis, K E; Farris, A

    2013-11-01

    The strain on clinic and surgeon resources resulting from a rise in demand for total knee replacement (TKR) requires reconsideration of when and how often patients need to be seen for follow-up. Surgeons will otherwise require increased paramedical staff or need to limit the number of TKRs they undertake. We reviewed the outcome data of 16 414 primary TKRs undertaken at our centre to determine the time to re-operation for any reason and for specific failure mechanisms. Peak risk years for failure were determined by comparing the conditional probability of failure, the number of failures divided by the total number of TKRs cases, for each year. The median times to failure for the most common failure mechanisms were 4.9 years (interquartile range (IQR) 1.7 to 10.7) for femoral and tibial loosening, 1.9 years (IQR 0.8 to 3.9) for infection, 3.1 years (IQR 1.6 to 5.5) for tibial collapse and 5.6 years (IQR 3.4 to 9.3) for instability. The median time to failure for all revisions was 3.3 years (IQR 1.2 to 8.5), with an overall revision rate of 1.7% (n = 282). Results from our patient population suggest that patients be seen for follow-up at six months, one year, three years, eight years, 12 years, and every five years thereafter. Patients with higher pain in the early post-operative period or high body mass index (≥ 41 kg/m(2)) should be monitored more closely.

  7. Suicide risk among young children after the Great East Japan Earthquake: A follow-up study.

    Science.gov (United States)

    Fujiwara, Takeo; Yagi, Junko; Homma, Hiroaki; Mashiko, Hirobumi; Nagao, Keizo; Okuyama, Makiko

    2017-07-01

    On 11 March 2011, the Great East Japan Earthquake and subsequent tsunami hit East Japan. We aim to investigate the impact of trauma experiences related to the earthquake on suicide risk among young children, stratified by child sex. Participants at baseline were children who were exposed to the 2011 disaster at preschool age (affected area, n=198; unaffected area, n=82, total n=280). From July 2013 to May 2014, suicide risk was assessed using the Mini International Neuropsychiatric Interview for Children and Adolescents (MINI-KID) in a follow-up interview conducted by a child psychiatrist or psychologist (N=210, follow-up rate: 75%). Among young girls in the affected area, 12 out of 65 (18.5%) showed suicidal ideation, which is significantly higher than girls in the unaffected area (4.7%, p for chi-square=0.036). In the multivariate model adjusted for potential confounders and mediators, the odds ratio for 4 or more trauma experiences related to the earthquake was 5.74 (95% confidence interval: 0.83-39.6, p=0.076) compared to no trauma experience related to the earthquake. Among young boys, trauma exposure was not associated with suicidal ideation. Our findings showed that young girls who experienced earthquake-related trauma at preschool age had a higher suicidal ideation 3 years after the earthquake. Copyright © 2017. Published by Elsevier B.V.

  8. [Follow-up and treatment outcome of early anorexia nervosa].

    Science.gov (United States)

    Schulze, U; Neudörfl, A; Krill, A; Warnke, A; Remschmidt, H; Herpertz-Dahlmann, B

    1997-03-01

    In a two-center follow-up study on the early-onset form of anorexia nervosa, we reexamined 43 (74%) of 58 former patients who had developed anorexia nervosa at the age of 13 years or younger. In addition to make a standardized assessment of the eating disorder at follow-up we assessed psychiatric comorbidity with a structured interview based on the criteria of DSM-III-R and ICD-10. After an average follow-up period of 6.8 years, 8 (18%) of our former patients had an eating disorder not otherwise specified (EDNOS) and 4 (9%) still suffered from anorexia nervosa. 5 (11%) of the subjects had developed bulimia nervosa. In 3 cases (7%) we found both syndromes. 12 (28%) of our former patients had an additional psychiatric disorder. The results of our study indicate that the quality of outcome in patients with an early-onset form of anorexia nervosa does not differ from that in individuals with a later manifestation of the eating disorder. Factors of prognostic relevance were the existence of an eating disorder during the first year of life and the duration of the follow-up period.

  9. Refractive surgery for accommodative esotropia: 5-year follow-up.

    Science.gov (United States)

    Magli, Adriano; Forte, Raimondo; Gallo, Flavio; Carelli, Roberta

    2014-02-01

    To assess the long-term effectiveness and safety of refractive surgery with LASIK or photorefractive keratectomy (PRK) for treating accommodative esotropia in adults. All patients with accommodative esotropia treated with LASIK or PRK until December 2007 and with a minimum follow-up of 5 years were retrospectively included. LASIK was performed on 44 eyes of 22 patients (12 women, 10 men; mean age: 22.7 ± 2.9 years). Mean postoperative follow-up was 62.1 ± 3.2 months. PRK was performed on 16 eyes of 8 patients (4 women, 4 men; mean age: 23.7 ± 1.7 years). Mean postoperative follow-up was 61.3 ± 2.8 months. At the 5-year follow-up, the mean cycloplegic refraction was more hyperopic in the PRK group (0.3 ± 0.8 vs 0.06 ± 0.3 diopters, P = .01). Correction of esotropia to esophoria or orthotropia was present in 21 patients (95.4%) treated with LASIK and in all patients treated with PRK. Both LASIK and PRK were effective in the long-term reduction of accommodative esotropia. Copyright 2014, SLACK Incorporated.

  10. Caffeine use and dependence in adolescents: one-year follow-up.

    Science.gov (United States)

    Oberstar, Joel V; Bernstein, Gail A; Thuras, Paul D

    2002-01-01

    The objectives were to conduct a 1-year follow-up of daily caffeine-using adolescents to further describe caffeine dependence symptoms and to determine whether caffeine dependence is associated with other substance dependence disorders. Twenty-one of 36 (58.3%) adolescents who participated in a study of caffeine dependence returned for follow-up. The previous study was a case series of adolescents who consumed caffeine daily and met some Diagnostic and Statistical Manual of Mental Disorders (fourth edition) substance dependence criteria as applied to caffeine. At follow-up, caffeine consumption from beverages was 179.9 +/- 151.8 mg/day. Of the 21 teenagers, 23.8% (n = 5) met criteria for caffeine dependence. Four of these participants developed caffeine dependence during the follow-up period. Other substance dependence disorders were not overrepresented in the caffeine dependent group compared to the caffeine nondependent group. The most commonly reported withdrawal symptoms in dependent teenagers (at baseline and follow-up combined) were feeling drowsy/tired, fatigued, or sluggish/slowed down (83.3% each) and headache (75.0%). Caffeine dependence occurs in some adolescents who drink caffeine daily and is marked by symptoms similar to those found in adults.

  11. Follow-up Medical Care After Cancer Treatment

    Science.gov (United States)

    ... Data Conducting Clinical Trials Statistical Tools and Data Terminology Resources NCI Data Catalog Cryo-EM NCI's Role ... Questions to Ask About Cancer Research Follow-Up Medical Care Once you’re done with cancer treatment, ...

  12. Follow-up of permanent hearing impairment in childhood.

    Science.gov (United States)

    Della Volpe, A; De Lucia, A; Pastore, V; Bracci Laudiero, L; Buonissimo, I; Ricci, G

    2016-02-01

    Programmes for early childhood childhood hearing impairment identification allows to quickly start the appropriate hearing aid fitting and rehabilitation process; nevertheless, a large number of patients do not join the treatment program. The goal of this article is to present the results of a strategic review of the strengths, weaknesses, opportunities and threats connected with the audiologic/prosthetic/language follow-up process of children with bilateral permanent hearing impairment. Involving small children, the follow-up includes the involvement of specialised professionals of a multidisciplinary team and a complex and prolonged multi-faced management. Within the framework of the Italian Ministry of Health project CCM 2013 "Preventing Communication Disorders: a Regional Program for Early Identification, Intervention and Care of Hearing Impaired Children", the purpose of this analysis was to propose recommendations that can harmonise criteria for outcome evaluation and provide guidance on the most appropriate assessment methods to be used in the follow-up course of children with permanent hearing impairment. © Copyright by Società Italiana di Otorinolaringologia e Chirurgia Cervico-Facciale.

  13. Follow-Up Photometry of Kelt Transiting Planet Candidates

    Science.gov (United States)

    Stephens, Denise C.; Joner, Michael D.; Hintz, Eric G.; Martin, Trevor; Spencer, Alex; Kelt Follow-Up Network (FUN) Team

    2017-10-01

    We have three telescopes at BYU that we use to follow-up possible transiting planet canidates for the KELT team. These telescopes were used to collect data on Kelt-16b and Kelt-9b, which is the hottest known exoplanet. More recently we used the newest of these telescopes, a robotic 8-inch telescope on the roof of our building, to confirm the most recent Kelt planet that will be published soon. This research has been ideal for the teaching and training of undergraduate students in the art of photometric observing and data reduction. In this presentation I will highlight how we are using our membership in the Kelt team to further the educational objective of our undergraduate astronomy program, while contributing meaningful science to the ever growing field of exoplanet discovery. I will also highlight a few of the more interesting Kelt planets and the minimum telescope requirements for detecting these planets. I will then discuss the sensitivities required to follow-up future TESS candidates, which may be of interest to others interested in joining the TESS follow-up teams.

  14. Course of disease and follow-up in breast cancer

    International Nuclear Information System (INIS)

    Ebner, F.; Hackl, H.; Hoermann, M.; Schneider, G.

    1986-01-01

    Besides individual care, regular follow-up studies in breast cancer patients have different aims, relative to different tumor stages at presentation. In early stages emphasis has to be laid on detection of loco-regional recurrences, which will not reduce overall survival if diagnosed and treated early. In addition, treatment effects and changes in the activity of disease are evaluated. Radiographic studies for detection of distant metastases are justified if followed by proper treatment. Early diagnosis of cancer of the opposite breast and of such cancers that are associated with breast cancer (colon, ovaries, endometrium) is imperative. The aim of a regular follow-up in more advanced tumor stages is to monitor the extent of disease and to prevent complications (e.g. fractures, spinal cord compression). In familial breast cancer first degree relatives should be included in the follow-up plan. The patient's psychosocial needs, even if not verbalized, should not be neglected. (Author)

  15. Measles vaccine: a 27-year follow-up.

    LENUS (Irish Health Repository)

    Ramsay, M E

    1994-04-01

    In 1964, the Medical Research Council undertook a trial of measles vaccine in over 36,000 United Kingdom children; 9577 of whom received live vaccine, 10,625 received inactivated followed by live vaccines, and 16,328 acted as unvaccinated controls. Participants in this study have been followed to determine the long term protection from measles vaccine and follow-up data were available on 4194, 4638 and 274 respectively. During the 5-year period 1986-90, the protective efficacy of live measles vaccine has remained high at 87%, but the 95% confidence interval was wide (-43 to 99%) due to the small numbers of cases. Between 1976 and 1990, however, the overall efficacy of the live vaccine was 92% (95% confidence interval 86 to 95%) and there was no evidence of a decline in efficacy (P = 0.13) over the 15-year period. This study suggests that the protection from live measles vaccine persists for up to 27 years after vaccination, and that no change in the current United Kingdom measles immunization policy should be made on the grounds of waning immunity.

  16. Radiographic follow-up study of Little Leaguer's shoulder

    International Nuclear Information System (INIS)

    Kanematsu, Yoshiji; Iwase, Takenobu; Matsuura, Tetsuya; Suzue, Naoto; Sairyo, Koichi; Kashiwaguchi, Shinji; Iwame, Toshiyuki

    2015-01-01

    Little Leaguer's shoulder is a syndrome involving the proximal humeral epiphyseal plate. Conservative treatment usually resolves the symptoms. However, there are no reports of a radiographic follow-up study of this disease. The purpose of this study was to show the radiographic healing process of Little Leaguer's shoulder. A total of 19 male baseball players diagnosed as having Little Leaguer's shoulder were retrospectively evaluated. The mean age at first presentation was 12.7 years. External rotation anteroposterior radiographs of the shoulder were taken. All patients were treated with rest from throwing, and no throwing was recommended until remodeling was confirmed. Follow-up radiographs were taken at 1-month intervals to assess healing. All patients were observed until healing was confirmed radiographically, after which they returned to baseball. The mean follow-up period was 8.5 months. In addition to radiography, patients were asked whether they had any symptoms and whether they had been able to return to baseball. At the first examination, radiographs showed a wider epiphyseal plate of the throwing side compared with the asymptomatic contralateral shoulder. Healing was observed in all cases. Healing occurred first along the medial side and was then extended laterally. The mean time required for healing was 4.7 months. All patients were able to return to playing baseball at their pre-injury level of play and were asymptomatic when examined at the final follow-up. The healing process of Little Leaguer's shoulder advanced from medial to lateral, and healing was achieved about 5 months after initial examination. (orig.)

  17. 29 CFR 1903.7 - Conduct of inspections.

    Science.gov (United States)

    2010-07-01

    ... of § 1903.3, inspections shall take place at such times and in such places of employment as the Area... photographs related to the purpose of the inspection, employ other reasonable investigative techniques, and... trade secrets.) As used herein, the term employ other reasonable investigative techniques includes, but...

  18. Potential for ultrasonic inspection of heat exchanger tubes

    International Nuclear Information System (INIS)

    Ward, M.J.

    1980-01-01

    Preliminary results of a program to develop an ultrasonic inspection method for heat-exchanger tubes, to be used as alternative or complementary to eddy-curent testing were sufficiently promising to warrant further study. Problems were encountered in adapting a standard commercial transducer and a custom-made transducer to provide full 360 degree coverage of an area for in-service inspection, but it might be possible to overcome these problems. The results showed it might prove impossible to design a transducer to handle the tight U-bends in some heat exchangers. The most promising area of application for ultrasonic inspection was found to be around the tubesheet. (DN)

  19. MDEP Technical Report TR-VICWG-04. Technical Report: Assessment of Multinational Vendor Inspection of Valinox Nuclear

    International Nuclear Information System (INIS)

    2015-01-01

    -conformances) in the areas of Record Control, Control of Special Processes (Heat Treatment), Corrective Actions, and Auditing. By letter dated 10 October 2014, Valinox responded to the findings including the corrective actions taken. By letter dated 11 November 2014, NRC requested Valinox to provide additional information regarding the corrective actions. By letter dated 12 may 2015, Valinox provided the additional information requested. By letter dated 4 August 2015, NRC informed Valinox that it has completed its review and the Notice of Nonconformance and their follow-up request for additional information have been addressed

  20. Treatment of craniopharyngioma estimated by follow-up CT

    Energy Technology Data Exchange (ETDEWEB)

    Kubota, T.; Ito, H.; Aizumi, S.; Yamamoto, S.; (Kanazawa Univ. (Japan). School of Medicine)

    1981-12-01

    Follow-up CT scans were taken from 12 cases of craniopharyngiomas after various treatment. Preoperative CT findings of craniopharyngiomas could be classified into three types. Type 1 was a non-enhanced or a thinly ring-like enhanced large cystic mass. Type 2 was a thickly enhanced large cystic mass with small solid mass. Type 3 was a large solid mass. Postoperative follow-up CT findings were as follows: Type 1 had a favorable postoperative course because the tumor tissues of the thin cystic wall seemed to collapse only with the procedure of cystic fluid aspiration. Recurrence frequently took place in patients of Type 2 and 3 if the tumor couldn't be radically removed or radiotherapy was not given after partial resection. Radiotherapy was most effective in these cases.

  1. Treatment of craniopharyngioma estimated by follow-up CT

    International Nuclear Information System (INIS)

    Kubota, Toshihiko; Ito, Haruhide; Aizumi, Shinichi; Yamamoto, Shinjiro

    1981-01-01

    Follow-up CT scans were taken from 12 cases of craniopharyngiomas after various treatment. Preoperative CT findings of craniopharyngiomas could be classified into three types. Type 1 was a non-enhanced or a thinly ring-like enhanced large cystic mass. Type 2 was a thickly enhanced large cystic mass with small solid mass. Type 3 was a large solid mass. Postoperative follow-up CT findings were as follows: Type 1 had a favorable postoperative course because the tumor tissues of the thin cystic wall seemed to collapse only with the procedure of cystic fluid aspiration. Recurrence frequently took place in patients of Type 2 and 3 if the tumor couldn't be radically removed or radiotherapy was not given after partial resection. Radiotherapy was most effective in these cases. (author)

  2. Automated ultrasonic inspection using PULSDAT

    International Nuclear Information System (INIS)

    Naybour, P.J.

    1992-01-01

    PULSDAT (Portable Ultrasonic Data Acquisition Tool) is a system for recording the data from single probe automated ultrasonic inspections. It is one of a range of instruments and software developed by Nuclear Electric to carry out a wide variety of high quality ultrasonic inspections. These vary from simple semi-automated inspections through to multi-probe, highly automated ones. PULSDAT runs under the control of MIPS software, and collects data which is compatible with the GUIDE data display system. PULSDAT is therefore fully compatible with Nuclear Electric's multi-probe inspection systems and utilises all the reliability and quality assurance of the software. It is a rugged, portable system that can be used in areas of difficult access. The paper discusses the benefits of automated inspection and gives an outline of the main features of PULSDAT. Since April 1990 PULSDAT has been used in several applications within Nuclear Electric and this paper presents two examples: the first is a ferritic set-through nozzle and the second is an austenitic fillet weld. (Author)

  3. Intelligent Automated Nuclear Fuel Pellet Inspection System

    International Nuclear Information System (INIS)

    Keyvan, S.

    1999-01-01

    At the present time, nuclear pellet inspection is performed manually using naked eyes for judgment and decisionmaking on accepting or rejecting pellets. This current practice of pellet inspection is tedious and subject to inconsistencies and error. Furthermore, unnecessary re-fabrication of pellets is costly and the presence of low quality pellets in a fuel assembly is unacceptable. To improve the quality control in nuclear fuel fabrication plants, an automated pellet inspection system based on advanced techniques is needed. Such a system addresses the following concerns of the current manual inspection method: (1) the reliability of inspection due to typical human errors, (2) radiation exposure to the workers, and (3) speed of inspection and its economical impact. The goal of this research is to develop an automated nuclear fuel pellet inspection system which is based on pellet video (photographic) images and uses artificial intelligence techniques

  4. Follow-up of pineal cysts in children. Is it necessary?

    Energy Technology Data Exchange (ETDEWEB)

    Jussila, Miro-Pekka [Oulu University Hospital and University of Oulu, Department of Diagnostic Radiology, Oulu (Finland); Oulu University Hospital and University of Oulu, Department of Children and Adolescents, Oulu (Finland); Olsen, Paeivi [Oulu University Hospital and University of Oulu, Department of Children and Adolescents, Oulu (Finland); University of Oulu, PEDEGO Research Group, Medical Research Center, Oulu (Finland); Salokorpi, Niina [Oulu University Hospital and University of Oulu, Department of Neurosurgery, Oulu (Finland); University of Oulu, Medical Research Center, Oulu (Finland); Suo-Palosaari, Maria [Oulu University Hospital and University of Oulu, Department of Diagnostic Radiology, Oulu (Finland); University of Oulu, Medical Research Center, Oulu (Finland)

    2017-12-15

    Pineal cysts are common incidental findings in children undergoing magnetic resonance imaging (MRI). Several studies have suggested MRI follow-up if the cyst is larger than 10 mm. However, cysts do not usually change during follow-up. Prevalence, growth, and structure of the pineal cysts were analyzed to decide if follow-up MRI is necessary. A retrospective review between 2010 and 2015 was performed using 3851 MRI examinations of children aged 0-16 years to detect pineal cysts having a maximum diameter ≥ 10 mm. Eighty-one children with pineal cysts were identified and 79 of them had been controlled by MRI. Cysts were analyzed for the size, growth, and structure. A total of 1.8% of the children had a pineal cyst with a diameter ≥ 10 mm. Cysts were present in 48 girls (59.3%) and 33 boys (40.7%). Most pineal cysts (70/79) did not significantly grow during the follow-up (median 10 months, range 3-145 months). A total of 11.4% (9/79) of the cysts grew with the biggest change measured from the outer cyst wall sagittal anteroposterior dimension (mean 3.4 mm ± 1.7 mm). Only one cyst grew more than 5 mm. We found no factors correlating with the cyst growth among 9 cysts that grew > 2 mm. A majority of pineal cysts remained unchanged during the MRI follow-up. Results of this study suggest that routine MRI follow-up of pineal cysts is not necessary in the absence of unusual radiological characteristics or related clinical symptoms. (orig.)

  5. Construction appraisal team inspection results on welding and nondestructive examination activities

    International Nuclear Information System (INIS)

    Wu, P.C.S.; Shaaban, H.I.

    1987-09-01

    This report summarizes data and findings on deficiencies and discrepancies in welding and nondestructive examination (NDE) activities identified by the US Nuclear Regulatory Commission Construction Appraisal Team (CAT) during its inspection of 11 plants. The CAT reviewed selected welds and NDE packages in its inspection of the following plant areas: piping and pipe supports and/or restraints; modification and installation of reactor internals; electrical installations and electrical supports; instrumentation tubing and supports; heating, ventilation, and air conditioning (HVAC) systems and supports; fabrication and erection of structural steel; fabrication of refueling cavity and spent fuel pool liner; containment liner and containment penetrations; and fire protection systems. The CAT inspected both structural welds and pressure-retaining welds and reviewed welder qualification test records and welding procedure documents for code compliance. The NDE activities that were evaluated included visual examination, magnetic particle examination, liquid penetrant examination, ultrasonic examination, and radiographic examination of welds. 4 refs., 14 figs., 15 tabs

  6. Risk informed in-service inspection and testing in Spain

    International Nuclear Information System (INIS)

    Bros, Juan; Marcelles, Ignacio

    2002-01-01

    The Spanish nuclear regulatory authority, the Consejo de Seguridad Nuclear (CSN), requires the use of codes and standards in force in the country of origin of the plant technology. For this reason, the in-service inspection and testing programs applied at Spanish nuclear power plants basically adhere to the requirements of the ASME XI and ASME OM Codes. It is not surprising that when the earliest developments aimed at drawing up risk informed inservice inspection and testing programs were initiated within the framework of ASME, the Spanish industry should follows such developments very closely. In fact, persons within the Spanish nuclear industry joined different ASME committees involved in the development and approval of the various code cases encompassing these developments. Developments specific to the Spanish nuclear power plants were initiated at a time when the aforementioned reference documentation was in a very advanced stage of development/approval. Two clearly differentiated lines of work got under way: On the one hand, and as regards risk informed in-service testing programs, the American standards were used as the sole reference. In the case of risk informed in-service inspection programs, the Spanish nuclear power plant-owning utilities and the Consejo de Seguridad Nuclear decided to draw up a Spanish guideline that, although using the ASME developments as a reference, would have its own specific characteristics. In relation to the above, and referring to the chronology of the events, the activities performed to date in Spain are described

  7. EA follow-up in the Ghanaian mining sector: Challenges and opportunities

    International Nuclear Information System (INIS)

    Appiah-Opoku, Seth; Bryan, Hobson C.

    2013-01-01

    Environmental assessment (EA) follow-up provides a means for monitoring and evaluating the implementation of environmental impact studies. It is integral to the success or failure of a project or program. In spite of its importance, very little attention is given to the need for follow-up programs in most jurisdictions in Africa. Using a case study in the Ghanaian mining sector, this paper explores the challenges and opportunities within the country's EA process for an effective follow-up program. The paper is based on informal interviews, content analysis of relevant publications, official EA documents, and internet searches. The authors suggest a standard EA follow-up program to be formalized as an integral part of Ghana's environmental assessment policy. They also propose a follow-up process that harnesses existing opportunities within the country's EA system. This approach can be replicated in other African countries

  8. Bone marrow edema syndrome of the foot: one year follow-up with MR imaging

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez-Canton, Guillermo; Casado, Oscar; Capelastegui, Ana; Astigarraga, Elena; Larena, Jose Alejandro; Merino, Amaya [OSATEK, Unidades de Resonancia Magnetica, Dr. Areilza 12-16, 48011, Bilbao, Basque Country (Spain)

    2003-05-01

    To describe the MR findings of bone marrow edema syndrome (BMES) of the foot and its evolution at 1 year follow-up.Design and patients Twenty-five of 32 patients with disabling foot and ankle pain unrelated to trauma diagnosed as BMES when MR imaging demonstrated a bone marrow edema pattern in one or more bones without any radiological or underlying clinical cause, were re-evaluated by MR imaging 1 year later. On the initial MR examinations an average of 4.7 individual bones were involved by bone marrow edema. Soft tissue edema was present in every patient and joint effusion in 10 patients. MR imaging at 1 year showed resolution of bone edema in 18 patients (72%), partial improvement in five (20%) and no improvement in two (8%). Six patients (24%) developed similar symptoms in the other foot during follow-up. Ten of 17 available plain radiographs showed some loss of radiodensity. Further bone marrow edema developed in bones of the same foot that were initially normal, or in uninvolved distant bone marrow areas in the same affected bone, in six of seven patients on follow-up MR imaging. The evolution of the MR findings of BMES of the foot is to complete resolution or partial improvement at 1 year in the majority of cases. Migration to the other foot occurs in up to a quarter of patients. (orig.)

  9. Bone marrow edema syndrome of the foot: one year follow-up with MR imaging

    International Nuclear Information System (INIS)

    Fernandez-Canton, Guillermo; Casado, Oscar; Capelastegui, Ana; Astigarraga, Elena; Larena, Jose Alejandro; Merino, Amaya

    2003-01-01

    To describe the MR findings of bone marrow edema syndrome (BMES) of the foot and its evolution at 1 year follow-up.Design and patients Twenty-five of 32 patients with disabling foot and ankle pain unrelated to trauma diagnosed as BMES when MR imaging demonstrated a bone marrow edema pattern in one or more bones without any radiological or underlying clinical cause, were re-evaluated by MR imaging 1 year later. On the initial MR examinations an average of 4.7 individual bones were involved by bone marrow edema. Soft tissue edema was present in every patient and joint effusion in 10 patients. MR imaging at 1 year showed resolution of bone edema in 18 patients (72%), partial improvement in five (20%) and no improvement in two (8%). Six patients (24%) developed similar symptoms in the other foot during follow-up. Ten of 17 available plain radiographs showed some loss of radiodensity. Further bone marrow edema developed in bones of the same foot that were initially normal, or in uninvolved distant bone marrow areas in the same affected bone, in six of seven patients on follow-up MR imaging. The evolution of the MR findings of BMES of the foot is to complete resolution or partial improvement at 1 year in the majority of cases. Migration to the other foot occurs in up to a quarter of patients. (orig.)

  10. Apparatus For Eddy-Current Inspection Of Bolts

    Science.gov (United States)

    Amos, Jay M.

    1994-01-01

    Eddy-current apparatus for inspection of bolts, studs, and other threaded fasteners detects flaws in threads, shanks, and head fillets. With help of apparatus, technician quickly inspects fasteners of various dimensions. Accommodates fasteners with diameters from 0.190 in. to 1 in. and with lengths up to 5 in. Basic design modified to accommodate fasteners of other sizes.

  11. Extended heart failure clinic follow-up in low-risk patients

    DEFF Research Database (Denmark)

    Schou, Morten; Gustafsson, Finn; Videbaek, Lars

    2013-01-01

    BackgroundOutpatient follow-up in specialized heart failure clinics (HFCs) is recommended by current guidelines and implemented in most European countries, but the optimal duration of HFC programmes has not been established. Nor is it known whether all or only high-risk patients, e.g. identified...... by NT-proBNP, might benefit from an extended HFC follow-up.Methods and resultsIn a multi-centre setting, we randomly assigned 921 clinically stable systolic heart failure (HF) outpatients on optimal medical therapy to undergo either an extended follow-up in the HFC (n = 461) or referral back...

  12. Colon neoplasms. Postoperative follow-up

    International Nuclear Information System (INIS)

    Galano Urgelles, Rolando; Rodriguez Fernandez, Zenen; Casaus Prieto, Arbelio

    1997-01-01

    A longitudinal and prospective study of 69 patients operated on for colon cancer was carried out during 6 years. Patients Webre folloWebd-up for the purpose of the study. The analysis evidenced that the most frequent age group ranged betWeben 65 and 74 years and that there was a predominance of females, as Webll as of stages II and III b and groups BI and BII according to Dukes' classification. Certain relapses resulting in re operations Webre detected. 5-fluoracil was used as a therapeutic agent, while the highest survival rate was attained in patients presenting with tumors in 0, I, II, and III a stages from groups A, BI, and CI of Dukes, or in those who complied with the cytostatic treatment. Survival outcomes Webre higher than the ones reported. Recommendations include to encourage mass screening in those risk groups at primary care level in order to detect early the entity, and thus improve the surgical outcomes and the results of postoperative follow-up

  13. Post-Closure Inspection and Monitoring Report for Corrective Action Unit 110: Area 3 WMD U-3ax/bl Crater, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2006-08-01

    This Post-Closure Inspection and Monitoring Report (PCIMR) provides the results of inspections and monitoring for Corrective Action Unit (CAU) 110, Area 3 WMD [Waste Management Division] U-3ax/bl Crater. This PCIMR includes an analysis and summary of the site inspections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at CAU 110, for the annual period July 2005 through June 2006. Site inspections of the cover were performed quarterly to identify any significant changes to the site requiring action. The overall condition of the cover, cover vegetation, perimeter fence, and UR warning signs was good. Settling was observed that exceeded the action level as specified in Section VILB.7 of the Hazardous Waste Permit Number NEV HW009 (Nevada Division of Environmental Protection, 2000). This permit states that cracks or settling greater than 15 centimeters (6 inches) deep that extend 1.0 meter (m) (3 feet [ft]) or more on the cover will be evaluated and repaired within 60 days of detection. Along the east edge of the cover (repaired previously in August 2003, December 2003, May 2004, October 2004), an area of settling was observed during the December 2005 inspection to again be above the action level, and required repair. This area and two other areas of settling on the cover that were first observed during the December 2005 inspection were repaired in February 2006. The semiannual subsidence surveys were done in September 2005 and March 2006. No significant subsidence was observed in the survey data. Monument 5 shows the greatest amount of subsidence (-0.015 m [-0.05 ft] compared to the baseline survey of 2000). This amount is negligible and near the resolution of the survey instruments; it does not indicate that subsidence is occurring on the cover. Soil moisture results obtained to date indicate that the CAU 110 cover is performing as expected. Time Domain Reflectometry (TDR) data indicated an increase in soil moisture (1

  14. Post-Closure Inspection and Monitoring Report for Corrective Action Unit 110: Area 3 WMD U-3ax/bl Crater, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2006-01-01

    This Post-Closure Inspection and Monitoring Report (PCIMR) provides the results of inspections and monitoring for Corrective Action Unit (CAU) 110, Area 3 WMD [Waste Management Division] U-3ax/bl Crater. This PCIMR includes an analysis and summary of the site inspections, repairs and maintenance, meteorological information, and soil moisture monitoring data obtained at CAU 110, for the annual period July 2005 through June 2006. Site inspections of the cover were performed quarterly to identify any significant changes to the site requiring action. The overall condition of the cover, cover vegetation, perimeter fence, and UR warning signs was good. Settling was observed that exceeded the action level as specified in Section VILB.7 of the Hazardous Waste Permit Number NEV HW009 (Nevada Division of Environmental Protection, 2000). This permit states that cracks or settling greater than 15 centimeters (6 inches) deep that extend 1.0 meter (m) (3 feet [ft]) or more on the cover will be evaluated and repaired within 60 days of detection. Along the east edge of the cover (repaired previously in August 2003, December 2003, May 2004, October 2004), an area of settling was observed during the December 2005 inspection to again be above the action level, and required repair. This area and two other areas of settling on the cover that were first observed during the December 2005 inspection were repaired in February 2006. The semiannual subsidence surveys were done in September 2005 and March 2006. No significant subsidence was observed in the survey data. Monument 5 shows the greatest amount of subsidence (-0.015 m [-0.05 ft] compared to the baseline survey of 2000). This amount is negligible and near the resolution of the survey instruments; it does not indicate that subsidence is occurring on the cover. Soil moisture results obtained to date indicate that the CAU 110 cover is performing as expected. Time Domain Reflectometry (TDR) data indicated an increase in soil moisture (1

  15. Electronic Whiteboards and Intensive Care Unit follow up

    DEFF Research Database (Denmark)

    Østergaard, Kija Lin; Brandrup, Morten

    -ended dry-erase whiteboard (make-up-your-own-sentences). In conclusion the primary feature in the two subjects is to optimize communication/collaboration and information between ICU and general wards in the transition. To make it a long term solution the content of such a support would need involvement...... of the end-users in the design process (Participatory Design). Hence these two findings, this review is setting the stage for further research on how electronic whiteboards can support the initial follow up when patients are transferred from an ICU to a general ward.......This paper is reviewing the existing literature on Intensive Care Unit (ICU) Outreach, in-hospital follow up 24 hours after the transition to a general ward from an ICU. It also touches upon the use of Electronic Whiteboards in a hospital setting and how the electronic whiteboards might support...

  16. Analytical framework and tool kit for SEA follow-up

    International Nuclear Information System (INIS)

    Nilsson, Mans; Wiklund, Hans; Finnveden, Goeran; Jonsson, Daniel K.; Lundberg, Kristina; Tyskeng, Sara; Wallgren, Oskar

    2009-01-01

    Most Strategic Environmental Assessment (SEA) research and applications have so far neglected the ex post stages of the process, also called SEA follow-up. Tool kits and methodological frameworks for engaging effectively with SEA follow-up have been conspicuously missing. In particular, little has so far been learned from the much more mature evaluation literature although many aspects are similar. This paper provides an analytical framework and tool kit for SEA follow-up. It is based on insights and tools developed within programme evaluation and environmental systems analysis. It is also grounded in empirical studies into real planning and programming practices at the regional level, but should have relevance for SEA processes at all levels. The purpose of the framework is to promote a learning-oriented and integrated use of SEA follow-up in strategic decision making. It helps to identify appropriate tools and their use in the process, and to systematise the use of available data and knowledge across the planning organization and process. It distinguishes three stages in follow-up: scoping, analysis and learning, identifies the key functions and demonstrates the informational linkages to the strategic decision-making process. The associated tool kit includes specific analytical and deliberative tools. Many of these are applicable also ex ante, but are then used in a predictive mode rather than on the basis of real data. The analytical element of the framework is organized on the basis of programme theory and 'DPSIR' tools. The paper discusses three issues in the application of the framework: understanding the integration of organizations and knowledge; understanding planners' questions and analytical requirements; and understanding interests, incentives and reluctance to evaluate

  17. Eddy currents inspection of CANDU steam generator' tubes using Zetec's ZR-1 Robot: experience in Romania

    Energy Technology Data Exchange (ETDEWEB)

    Hower, S. [Zetec Inc., Quebec, Quebec (Canada); Serban, M. [CNE-Prod U1 Cernavoda (Romania); Vladu, L. [Compcontrol Ing., Bucharest (Romania)

    2006-07-01

    'Full text:' The paper introduces the new ZR-1 Robot System for Inspection and Maintenance/Repair from Zetec that combines the newest state-of-the-art robotics technology with Zetec experience-based innovation to address the needs for inspection and repair of steam generators. The multipurpose ZR-1 can be easily installed to perform the necessary eddy current inspection and remain installed ready for follow-up maintenance and repair. It has superior technical performances and a modular three axis motion of arm that enables 100% coverage of tube sheet. Automated, repeatable, and precise positioning of toolheads, ensures accurate delivery and reducing costly rework and reduces inspection time by 30%. The modular, lightweight, and portable design permits easy assembly and disassembly through small openings and it reduces setup/tear down time by 30%. The first deployment of the new ZR-1 Robot was made in September 2004 at the Cernavoda NPP inspection outage. The Cernavoda plant has four Advanced 600 MW CANDU-design generators that have been in service since 1996. The paper presents also the Zetec's filed experience and customer experience with this system. It describes the equipment setup in Cernavoda's generator mock-up, functional testes and calibration. Finally, provides details on the execution of the inspection, options for standardizing the inspection techniques and conclusions. (author)

  18. NRC Information Notice No. 91-29, Supplement 1: Deficiencies identified during electrical distribution system functional inspections

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1993-01-01

    During multidiscipline inspections such as safety system functional inspections (SSFIs) or safety system outage modification inspections (SSOMIs), the NRC identified a number of deficiencies related to the electrical distribution system (EDS). As a result of these deficiencies, the NRC developed the EDSFI to specifically evaluate the EDS. Since 1989, the NRC has performed over 50 EDSFIs, and found design weaknesses in the following generic areas: (1) undervoltage relay setpoints for degraded grid conditions; (2) interrupting capacity of fault protection devices; (3) improper coordination of fault protection devices; (4) analysis of emergency diesel generator (EDG) capacity to power safety-related loads during postulated accidents; and (5) EDG mechanical interfaces. Each of these issues are discussed

  19. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    International Nuclear Information System (INIS)

    Matthews, Patrick; Petrello, Jaclyn

    2016-01-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

  20. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, Patrick [Navarro, Las Vegas, NV (United States); Petrello, Jaclyn [Navarro, Las Vegas, NV (United States)

    2016-03-01

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.

  1. Container inspection in the port container terminal by using 14 MeV neutrons

    Energy Technology Data Exchange (ETDEWEB)

    Valkovic, Vladivoj [Institute Ruder Boskovic, Zagreb (Croatia); Kvinticka 62, Zagreb (Croatia); Sudac, Davorin; Nad, Karlo; Obhodas, Jasmina [Ruder Boskovic Institute, Bijenicka c.54, Zagreb (Croatia)

    2015-07-01

    A proposal for an autonomous and flexible ship container inspection system is presented. This could be accomplished by the incorporation of inspection system on the container transportation devices (straddle carriers, yard gentry cranes automated guided vehicles, trailers). This configuration is terminal specific and it will be decided by container terminal operator. In such a way no part of port operational area will be used for inspection. The inspection scenario will include container transfer from ship to transportation device with inspection unit mounted on it, inspection during container movement to the container location. A neutron generator without associated alpha particle detection will be used. This will allow the use of higher neutron intensity (5x10{sup 9} - 10{sup 10} n/s in 4π). The inspected container will be stationary in the 'inspection position' on the transportation device while the 'inspection unit' will move along its side. Following analytical methods will be used simultaneously: neutron radiography, X-ray radiography, neutron activation analysis, (n,γ) and (n,n'γ) reactions, neutron absorption, and scattering, X-ray backscattering, Neutron techniques will take the advantage of using 'smart collimators' for neutrons and gammas, both emitted and detected. The inspected voxel will be defined by intersections/union of neutron generator and detectors solid angles. The container inspection protocol will be based on identification of discrepancies between its cargo manifest and its elemental 'fingerprint' and radiography profiles. In addition, the information on container weight will be obtained during the container transport and foreseen screening from the measurement of density of material in the container. (authors)

  2. Advanced In-Service Inspection Approaches Applied to the Phenix Fast Breeder Reactor

    International Nuclear Information System (INIS)

    Guidez, J.; Martin, L.; Dupraz, R.

    2006-01-01

    The safety upgrading of the Phenix plant undertaken between 1994 and 1997 involved a vast inspection programme of the reactor, the external storage drum and the secondary sodium circuits in order to meet the requirements of the defence-in-depth safety approach. The three lines of defence were analysed for every safety related component: demonstration of the quality of design and construction, appropriate in-service inspection and controlling the consequences of an accident. The in-service reactor block inspection programme consisted in controlling the core support structures and the high-temperature elements. Despite the fact that limited consideration had been given to inspection constraints during the design stage of the reactor in the 1960's, as compared to more recent reactor projects such as the European Fast Reactor (EFR), all the core support line elements were able to be inspected. The three following main operations are described: Ultrasonic inspection of the upper hangers of the main vessel, using small transducers able to withstand temperatures of 130 deg. C, Inspection of the conical shell supporting the core dia-grid. A specific ultrasonic method and a special implementation technique were used to control the under sodium structure welds, located up to several meters away from the scan surface. Remote inspection of the hot pool structures, particularly the core cover plug after partial sodium drainage of the reactor vessel. Other inspections are also summarized: control of secondary sodium circuit piping, intermediate heat exchangers, primary sodium pumps, steam generator units and external storage drum. The pool type reactor concept, developed in France since the 1960's, presents several favourable safety and operational features. The feedback from the Phenix plant also shows real potential for in-service inspection. The design of future generation IV sodium fast reactors will benefit from the experience acquired from the Phenix plant. (authors)

  3. GRB follow-up observations in the East-Asian region

    International Nuclear Information System (INIS)

    Tamagawa, T.; Urata, Y.; Tokyo Institute of Technology, Tokyo; Huang, K. Y.; Ip, W.H.; Qiu, Y.; Hu, J.Y.; Zhou, Xn.; Onda, K.; Tokyo Univ. of Sciences, Tokyo; Makishima, K.; Tokyo Univ., Tokyo

    2005-01-01

    In 2004, we established a Japan-Taiwan-China collaboration for GBR study in the East-Asian region. This serves as a valuable addiction to the world-wide optical and infrared follow-up network, because the East-Asia region would otherwise be blank. We have been carrying out imaging and spectroscopy follow-up observations at Lulin (Taiwan), Kiso (Japan), WIDGET (Japan) and Xinglong (China). From Xinglong and Kiso, we can locate candidates and obtain early time spectra for afterglows. While WIDGET provides early time observations before the bursts, the high-time resolution for multi-band light curves can be obtained at Lulin. With the data from these sites, we can obtain detailed information about the light curve and redshift of GRBs, which are important to understand the mechanism of the afterglows. Up to March 2005, ten follow-up observations have been provided by this East-Asia cooperation. Two optical afterglows were detected, GRB 040924 and GRB 041006. The results of the two detected afterglows are reported in this paper

  4. GRB follow-up observations in the East-Asian region

    Energy Technology Data Exchange (ETDEWEB)

    Tamagawa, T. [RIKEN, Saitama (Japan); Urata, Y. [RIKEN, Saitama (Japan); Tokyo Institute of Technology, Tokyo (Japan). Department of Physics; Huang, K. Y.; Ip, W.H. [National Centre University, Tokyo (Japan). Institute of Astronomy; Qiu, Y.; Hu, J.Y.; Zhou, Xn. [Chinese Academy of Sciences, Beijing (China). National Astronomical Observatoires; Onda, K. [RIKEN, Saitama (Japan); Tokyo Univ. of Sciences, Tokyo (Japan). Department of Physics; Makishima, K. [RIKEN, Saitama (Japan); Tokyo Univ., Tokyo (Japan). Department of Physics

    2005-07-15

    In 2004, we established a Japan-Taiwan-China collaboration for GBR study in the East-Asian region. This serves as a valuable addiction to the world-wide optical and infrared follow-up network, because the East-Asia region would otherwise be blank. We have been carrying out imaging and spectroscopy follow-up observations at Lulin (Taiwan), Kiso (Japan), WIDGET (Japan) and Xinglong (China). From Xinglong and Kiso, we can locate candidates and obtain early time spectra for afterglows. While WIDGET provides early time observations before the bursts, the high-time resolution for multi-band light curves can be obtained at Lulin. With the data from these sites, we can obtain detailed information about the light curve and redshift of GRBs, which are important to understand the mechanism of the afterglows. Up to March 2005, ten follow-up observations have been provided by this East-Asia cooperation. Two optical afterglows were detected, GRB 040924 and GRB 041006. The results of the two detected afterglows are reported in this paper.

  5. Thermographic inspection of pipes, tanks, and containment liners

    Energy Technology Data Exchange (ETDEWEB)

    Renshaw, Jeremy B., E-mail: jrenshaw@epri.com; Muthu, Nathan [Electric Power Research Institute, 1300 West WT Harris Blvd., Charlotte, NC 28262 (United States); Lhota, James R.; Shepard, Steven M., E-mail: sshepard@thermalwave.com [Thermal Wave Imaging, 845 Livernois St., Ferndale, MI 48220 (United States)

    2015-03-31

    Nuclear power plants are required to operate at a high level of safety. Recent industry and license renewal commitments aim to further increase safety by requiring the inspection of components that have not traditionally undergone detailed inspected in the past, such as tanks and liners. NEI 09-14 requires the inspection of buried pipes and tanks while containment liner inspections are required as a part of license renewal commitments. Containment liner inspections must inspect the carbon steel liner for defects - such as corrosion - that could threaten the pressure boundary and ideally, should be able to inspect the surrounding concrete for foreign material that could be in contact with the steel liner and potentially initiate corrosion. Such an inspection requires a simultaneous evaluation of two materials with very different material properties. Rapid, yet detailed, inspection results are required due to the massive size of the tanks and containment liners to be inspected. For this reason, thermal NDE methods were evaluated to inspect tank and containment liner mockups with simulated defects. Thermographic Signal Reconstruction (TSR) was utilized to enhance the images and provide detailed information on the sizes and shapes of the observed defects. The results show that thermographic inspection is highly sensitive to the defects of interest and is capable of rapidly inspecting large areas.

  6. Planning and programming of pre-operational and in-service inspections

    International Nuclear Information System (INIS)

    Udaondo, M.S.

    1984-01-01

    After a brief mention of the actual scope of in-service inspection work, conclusions are presented that relate to the preparations for inspections, making use of experience acquired since 1972 at 11 nuclear power plants in Spain which have commissioned such studies from one particular organization, and analyses are given of the advantages to be gained therefrom. Three different aspects of preparations for inspections are considered: (a) man-hour estimates and the duration of in-service inspections; (b) the sequence of action during a pre-operational inspection (assuming a typical functional organization) from definition of the codes of practice and standards applicable up to the issue of the final report and the schedule for distribution of the annual work load to be invested in a typical project, as a result of combining the two previous estimates, and (c) the documentary aspect of preparations for an inspection during a scheduled outage, as related to the various documents to be drawn up and their contents. Reference is made to the general training to be given to the staff in charge of inspection activities so as to provide them with information on, and a perspective of, the in-service inspection jobs required. (author)

  7. Neonatal follow-up program: Where do we stand?

    Science.gov (United States)

    2012-01-01

    Neonatal follow-up program (NFP) is becoming the corner stone of standard, high quality care provided to newborns at risk of future neuorodevelopmental delay. Most of the recognized neonatal intensive care units in the developed countries are adopting NFP as part of their mandatory care for the best long term outcome of high risk infants, especially very low birth weight (VLBW) infants. Unfortunately, in the developing and in underdeveloped countries, such early detection and intervention programs are rarely existing, mainly because of the lack of awareness of and exposure to such programs in spite of the increasing numbers of surviving sick newborns due to advancement in neonatal care in these countries. This is a review article to explore the Neonatal follow-up programs looking at historical development, benefts and aims, and standard requirements for successful program development that can be adopted in our countries. In conclusion, proper Neonatal follow-up programs are needed to improve neonatal outcome. Therefore all professionals working in the feld of neonatal care in developing countries should cooperate to create such programs for early detection and hence early intervention for any adverse long term outcome in high-risk newborn infants PMID:27493326

  8. Development of Wall Thinning Distinction Method using the Multi-inspecting UT Data of Carbon Steel Piping

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Kyeong Mo; Yun, Hun; Lee, Chan Kyoo [KEPCO E and C, Yongin (Korea, Republic of)

    2012-05-15

    To manage the wall thinning of carbon steel piping in nuclear power plants, the utility of Korea has performed thickness inspection for some quantity of pipe components during refueling outages and determined whether repair or replacement after evaluating UT (Ultrasonic Test) data. When the existing UT data evaluation methods, such as Band, Blanket, PTP (Point to Point) Methods, are applied to a certain pipe component, unnecessary re-inspecting situations may be generated even though the component does not thinned. In those cases, economical loss caused by repeated inspection and problems of maintaining the pipe integrity followed by decreasing of newly inspected components may be generated. EPRI (Electric Power Research Institute) in USA has suggested several statistical methods, TPM (Total Point Method), LSS (Least Square Slope) Method, etc. to distinguish whether multiple inspecting components have thinned or not. This paper presents the analysis results for multiple inspecting components over three times based on both NAM (Near Area of Minimum) Method developed by KEPCO-E and C and the other methods suggested by EPRI.

  9. 2015 annual report of the managing director of the CEA general and nuclear inspection for nuclear safety and radiation protection

    International Nuclear Information System (INIS)

    2016-08-01

    After an introduction by the managing director of the CEA general and nuclear inspection about activities and events of 2015, this report proposes some key figures and indicators to illustrate these activities and events. The next parts discuss, present and comment how a culture of safety is at the heart of the continuous progress approach by the CEA. The next chapters propose overviews and comments of lessons learned from nuclear inspections within the frame of audit programme or within the frame of centres' safety audits, and from reactive inspections. The last parts address the follow-up of recommendations, and progress orientations and perspectives

  10. Exercise-Induced Ventricular Fibrillation: Seven Years Follow-Up

    Directory of Open Access Journals (Sweden)

    Gökmen Gemici

    2011-11-01

    Full Text Available We present a 7-year follow-up of a 55-year-old male who experienced ventricular fibrillation during the recovery period of exercise testing and refused implantation of an ICD. Normal left ventricular systolic function was found on echocardiographic examination, and coronary angiography revealed only a side branch disease with a vessel diameter of less than 2 millimeters. The patient was discharged on metoprolol and ASA in addition to his previous treatment with lisinopril and simvastatin. Outpatient cardiac evaluation by repeated 24-hour ECG monitorizations (Holter revealed normal findings. On follow up visits every six months for the past seven years, the patient was found to be asymptomatic.

  11. Loss to follow-up in an international, multicentre observational study

    DEFF Research Database (Denmark)

    Mocroft, A; Kirk, O; Aldins, P

    2008-01-01

    OBJECTIVE: The aim of this work was to assess loss to follow-up (LTFU) in EuroSIDA, an international multicentre observational cohort study. METHODS: LTFU was defined as no follow-up visit, CD4 cell count measurement or viral load measurement after 1 January 2006. Poisson regression was used...

  12. Taste disorders after tonsillectomy: a long-term follow-up.

    Science.gov (United States)

    Heiser, Clemens; Landis, Basile N; Giger, Roland; Cao Van, Helene; Guinand, Nils; Hörmann, Karl; Stuck, Boris A

    2012-06-01

    In a former study, taste disturbances after tonsillectomy seemed to be more frequent than expected. Eight percent of patients reported subjective taste disorders 6 months after tonsillectomy. Fifteen patients from the initial trial, who reported taste disorders after tonsillectomy, were contacted again for this long-term follow-up. A telephone interview using the same questionnaire addressing the current self-estimate of taste function was performed. At 32 ± 10 months following surgery, two (0.9%) patients still reported suffering from taste disturbance. This long-term follow-up study shows that dysgeusia following tonsillectomy occurs in approximately 1% of patients. These data should be considered when patients are informed about complications after tonsillectomy. Copyright © 2012 The American Laryngological, Rhinological, and Otological Society, Inc.

  13. Nut consumption and incidence of metabolic syndrome after 6-year follow-up: the SUN (Seguimiento Universidad de Navarra, University of Navarra Follow-up) cohort.

    Science.gov (United States)

    Fernández-Montero, Alejandro; Bes-Rastrollo, Maira; Beunza, Juan J; Barrio-Lopez, Maria Teresa; de la Fuente-Arrillaga, Carmen; Moreno-Galarraga, Laura; Martínez-González, Miguel Angel

    2013-11-01

    To assess the long-term relationship between tree nut consumption and the risk of developing metabolic syndrome (MetS). Nut consumption was collected using a validated 136-item FFQ. The MetS was defined according to the International Diabetes Federation and American Heart Association/National Heart, Lung, and Blood Institute harmonizing definition. The association between nut consumption and MetS was assessed with logistic regression models adjusting for potential confounders. We compared the incidence of MetS between extreme categories of nut intake (> or = 2 servings/week v. never/almost never) after 6 years of follow-up. The SUN Project (Seguimiento Universidad de Navarra, University of Navarra Follow-up) is a prospective cohort study, formed of Spanish university graduates. Information is gathered by mailed questionnaires collected biennially. Nut consumption and MetS information was collected by self-reported data. Participants (n 9887) initially free of MetS or diabetes and followed up for a minimum of 6 years were included. We observed 567 new cases of MetS during follow-up. Participants who consumed nuts > or = 2 servings/week presented a 32% lower risk of developing MetS than those who never/almost never consumed (adjusted OR = 0.68, 95% CI 0.50, 0.92). The inverse association was stronger among participants who were health professionals. Nut consumption was significantly associated with lower risk of developing MetS after a 6-year follow-up period in a cohort of Spanish graduates.

  14. An optimal inspection strategy for randomly failing equipment

    International Nuclear Information System (INIS)

    Chelbi, Anis; Ait-Kadi, Daoud

    1999-01-01

    This paper addresses the problem of generating optimal inspection strategies for randomly failing equipment where imminent failure is not obvious and can only be detected through inspection. Inspections are carried out following a condition-based procedure. The equipment is replaced if it has failed or if it shows imminent signs of failure. The latter state is indicated by measuring certain predetermined control parameters during inspection. Costs are associated with inspection, idle time and preventive or corrective actions. An optimal inspection strategy is defined as the inspection sequence minimizing the expected total cost per time unit over an infinite span. A mathematical model and a numerical algorithm are developed to generate an optimal inspection sequence. As a practical example, the model is applied to provide a machine tool operator with a time sequence for inspecting the cutting tool. The tool life time distribution and the trend of one control parameter defining its actual condition are supposed to be known

  15. Patients highly value routine follow-up of skin cancer and cutaneous melanoma

    DEFF Research Database (Denmark)

    Themstrup, Lotte; Jemec, Gregor E; Lock-Andersen, Jørgen

    2013-01-01

    INTRODUCTION: Skin cancer follow-up is a substantial burden to outpatient clinics. Few studies have investigated patients' views on skin cancer follow-up and cutaneous melanoma. The objective was to investigate patients' perceived benefits and the impact of follow-up. MATERIAL AND METHODS...

  16. [Testicular cancer: a model to optimize the radiological follow-up].

    Science.gov (United States)

    Stebler, V; Pauchard, B; Schmidt, S; Valerio, M; De Bari, B; Berthold, D

    2015-05-20

    Despite being rare cancers, testicular seminoma and non-seminoma play an important role in oncology: they represent a model on how to optimize radiological follow-up, aiming at a lowest possible radiation exposure and secondary cancer risk. Males diagnosed with testicular cancer undergo frequently prolonged follow-up with CT-scans with potential toxic side effects, in particular secondary cancers. To reduce the risks linked to ionizing radiation, precise follow-up protocols have been developed. The number of recommended CT-scanners has been significantly reduced over the last 10 years. The CT scanners have evolved technically and new acquisition protocols have the potential to reduce the radiation exposure further.

  17. Risk-adapted treatment and follow-up management in childhood-onset craniopharyngioma.

    Science.gov (United States)

    Müller, Hermann L

    2016-05-01

    Craniopharyngiomas are rare embryonic malformations of the sellar/parasellar region with low histological grade. Here, we review findings on the diagnosis, treatment, clinical course, follow-up, and prognosis of craniopharyngioma patients. Clinical manifestations develop from increased intracranial pressure, anterior visual pathway damage, and hypothalamic/pituitary deficiencies. If the tumor is favorably localized (no anatomical involvement with the hypothalamic and optical structures) therapy of choice is complete resection, meticulously performed to preserve hypothalamic and optic functions. In patients with unfavorable tumor involvement, optimal therapy is limited hypothalamus-sparing surgical strategy, followed by judicious irradiation dosage to minimize recurrences and progression. Surgical lesions and/or anatomical involvement of posterior hypothalamic areas result in serious sequelae, mainly hypothalamic syndrome. Craniopharyngioma is a chronic disease and must be managed as such, providing ongoing care of pediatric and adult patients by experienced multidisciplinary teams in the context of multicenter trials.

  18. Experts Complete IAEA Follow-up Review of Australia's Nuclear Regulatory Authority

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: Nuclear and radiation safety experts today concluded an eight-day mission to review the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA), the country's nuclear regulator. At the request of the Australian Government, the International Atomic Energy Agency (IAEA) assembled a peer-review team of five regulatory experts from as many nations and three IAEA staff members to conduct a follow-up assessment of an Integrated Regulatory Review Service (IRRS) mission conducted in 2007. This follow-up IRRS mission examined ARPANSA's progress in acting upon the recommendations and suggestions made during the 2007 IRRS mission and reviewed the areas of significant regulatory changes since that review. Both reviews covered safety regulatory aspects of all facilities and activities regulated by ARPANSA. IRRS team leader Kaare Ulbak, Chief Advisor of Denmark's National Institute of Radiation Protection, said: ''ARPANSA should be commended for the significant amount of efforts in addressing all the findings identified in the 2007 mission and for inviting this follow-up review.'' The review team found that ARPANSA has made significant progress toward improving its regulatory activities, as most of the findings identified in the 2007 report have been effectively addressed and therefore can be considered closed. Complementing the ARPANSA strengths identified during the 2007 mission, the 2011 IRRS team noted the following strengths: Response to the Tepco Fukushima Dai-ichi accident; High level of in-house technical expertise in radiation safety; Recognition of the need and willingness to re-organize ARPANSA; Timely development of the national sealed source register in good coordination with other relevant organizations; and Creation of the Australian clinical dosimetry service and the national dose reference levels database. The 2011 IRRS team also made recommendations and suggestions to further strengthen ARPANSA's regulatory system, including: Making full

  19. Strategy of Risk-Informed Inspection for Secondary Systems in NPPs

    International Nuclear Information System (INIS)

    Kim, So Young; Heo, Gyun Young

    2012-01-01

    Recently, unexpected accidents such as large-scale blackout have been occurred due to increasing demand of electricity. The unplanned trips have great influence over the economics although they rarely affect the safety of system. Because the cost for inspection and maintenance is limited, it is beneficial not only economically to take follow-up action in a timely manner to prevent plant trip but also in safety by protecting against the risk which is occurred from trip. In nuclear power plants (NPPs), the importance about risk-informed service such as inspection, maintenance and replacement is becoming on the rise. Risk-informed techniques such as in-service test, in-service inspection, design guide change and etc. are already used in nuclear field but these techniques are applied focusing on primary system for safety-related regulatory issues. It is needed to consider the optimization of inspection informed risk for entire plant including secondary system which is not applied enough. The study about risk-based inspection for boilers in thermal power field is in progress actively, but not for turbine cycle, which is similar with nuclear industry. Today, the most of inspections or tests for turbine cycle are time-based maintenance, being performed on time. It is required to perform condition-based maintenance by evaluating risk analyzing both of probability and consequence simultaneously about damage mechanisms that can be predicted by equipment or devices configuring the secondary system. Probability of failure (POF) is analyzed in terms of materials' ageing mechanisms, but consequence of failure (COF) should be evaluated in terms of thermohydraulic condition then it is needed to check power loss and period of maintenance. This paper is going to propose the idea to quantify the consequence of failure using the fault tree and simulation for secondary system, and propose quantitative risk-informed inspection by these approaches

  20. Northeast Inspection Services, Inc. boresonic inspection system evaluation

    International Nuclear Information System (INIS)

    Nottingham, L.D.; Sabourin, P.F.; Presson, J.H.

    1993-04-01

    Turbine rotor reliability and remaining life assessment are continuing concerns to electric utilities. Over the years, boresonic inspection and evaluation have served as primary components in rotor remaining life assessment. Beginning with an evaluation of TREES by EPRI in 1982, a series of reports that document the detection and sizing capabilities of several boresonic systems have been made available. These studies should provide utilities with a better understanding of system performance and lead to improved reliability when predicting rotor remaining life. In 1990, the procedures followed for evaluating rotor boresonic performance capabilities were changed to transfer a greater portion of the data analysis function to the participating vendor. This change from previous policy was instituted so that the evaluation results would better reflect the ''final answer'' that a vendor would provide in a real rotor inspection and also to reduce the cost of an evaluation. Among the first vendors to participate in the new performance demonstration was Northeast Inspection Services, Inc. (NISI). The tests reported herein were conducted by NISI personnel under the guidelines of the new plan. Details of the new evaluation plan are also presented. Rotor bore blocks containing surface-connected fatigue cracks, embedded glass beads, and embedded radial-axial oriented disks were used in the evaluation. Data were collected during twenty-five independent passes through the blocks. The evaluation consisted of statistical characterization of the detection capabilities, flaw sizing and location accuracy, and repeatability of the inspection system. The results of the evaluation are included in this report

  1. MRI of penile fracture: diagnosis and therapeutic follow-up

    International Nuclear Information System (INIS)

    Uder, Michael; Gohl, Dietrich; Takahashi, Masahide; Kramann, Bernhard; Schneider, Guenther

    2002-01-01

    A rupture of corpus cavernosum (CC) is a rare injury of the erect penis. The present study describes the role of MRI for diagnosis and follow-up of this injury. Four patients with clinically suspected acute penile fractures underwent MRI. Imaging findings were confirmed at surgery. In three patients, follow-up MRI was also available at 1, 6 and 16 weeks after surgical repair. In all patients pre-contrast T1-weighted images (T1WI) clearly disclosed ruptures of CC, which depicted as discontinuity of low signal intensity of the tunica albuginea (TA). Concomitant subcutaneous haematoma were well visualised both on T1-weighted (T1WI) and T2-weighted images, whereas haematoma in CC were optimally demonstrated on contrast-enhanced T1WI. On follow-up MRI all fractures presented similar healing process. Shortly after the repair, the tunical suture showed an increase in signal intensity on pre-contrast T1WI and was strongly enhanced with the administration of contrast material. Then the tear site gradually recovered low signal intensity on all spin-echo sequences by 4 months after surgery. These serial findings may suggest the formation of vascularised granulation tissue during cicatrisation. Magnetic resonance imaging is of great value for the diagnosis and follow-up in patients with penile fracture. (orig.)

  2. Hanford Facility resource conservation and recovery act permit general inspection plan

    International Nuclear Information System (INIS)

    Beagles, D.B.

    1995-12-01

    The Hanford Facility Resource Conservation and Recovery Act Permit, General Inspection Requirements, includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 Areas and the banks of the Columbia River. This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility

  3. Safety inspection guide, Mod III (a systematic approach to conducting a safety inspection)

    International Nuclear Information System (INIS)

    Davidson, J.E.

    1977-06-01

    This guide was developed as a comprehensive/systematic approach to the problem of performing a safety inspection. Five basic sections (categories) are considered in the guide: physical work place; machines/mechanical equipment; hazardous materials/processes/environments; energy sources; and management hazard . control factors. The basic concept is that one starts evaluating hazard potentials from the physical work place and continues considering other elements as they are added to the physical work place. This approach provides a better understanding of the interfaces of each section to the entire group. The guide is supported by an Area Safety Inspection Result form to record defects or conditions found, the evaluation (best estimate) of the urgency or priority for correcting deficiencies or areas of noncompliance, and the status of corrective action. Additionally, the guide serves as an educational tool in accident prevention for supervisors and employees

  4. MR imaging follow-up studies in patients with aplastic anemia

    International Nuclear Information System (INIS)

    Tscholakoff, D.; Herold, C.; Pongracz, I.; Hinterberger, W.; Kier, P.; Chott, A.; Imhof, H.

    1988-01-01

    Eight patients with aplastic anemia underwent MR imaging of the pelvis and thoracolumbar spine before and during treatment. Bone marrow patterns on MR images were correlated with stem-cell and peripheral-blood cell counts and Prussian blue stain of bone marrow (to estimate iron overload). Before treatment, two different bone marrow patterns were observed. Three patients had diffuse, homogeneous high signal intensity throughout the bone marrow, indicating fatty replacement of hematopoietic bone marrow. Bone marrow stains were negative for iron overload. Follow-up studies in these three patients showed multiple areas of hypointense foci in the bone marrow at the time when stem cell and blood cell counts returned to normal. The remaining five patients displayed inhomogeneous signal distribution (hypointense foci on T1-weighted images) in the bone marrow on the first and following MR studies. All five patients did not respond to therapy and had multiple transfusions. Bone marrow signal intensities (correlated to a phantom) were similar in patients with recovery of hematopoietic bone marrow and patients with hemochromatosis

  5. Line-scan inspection of conifer seedlings

    Science.gov (United States)

    Rigney, Michael P.; Kranzler, Glenn A.

    1993-05-01

    Almost two billion conifer seedlings are produced in the U.S. each year to support reforestation efforts. Seedlings are graded manually to improve viability after transplanting. Manual grading is labor-intensive and subject to human variability. Our previous research demonstrated the feasibility of automated tree seedling inspection with machine vision. Here we describe a system based on line-scan imaging, providing a three-fold increase in resolution and inspection rate. A key aspect of the system is automatic recognition of the seedling root collar. Root collar diameter, shoot height, and projected shoot and root areas are measured. Sturdiness ratio and shoot/root ratio are computed. Grade is determined by comparing measured features with pre-defined set points. Seedlings are automatically sorted. The precision of machine vision and manual measurements was determined in tests at a commercial forest nursery. Manual measurements of stem diameter, shoot height, and sturdiness ratio had standard deviations three times those of machine vision measurements. Projected shoot area was highly correlated (r2 equals 0.90) with shoot volume. Projected root area had good correlation (r2 equals 0.80) with root volume. Seedlings were inspected at rates as high as ten per second.

  6. Development of video probe system for inspection of feeder pipe support in calandria reactor

    International Nuclear Information System (INIS)

    Cho, Jai Wan; Lee, Nam Ho; Choi, Young Soo

    2000-07-01

    There are 760 feederpipes, which they are connected to inlet/outlet of the 380 pressure tube channels on the front of the calandria, in CANDU-type Reactor of Wolsung Nuclear Power Plant. As an ISI(In-Service Inspection) and PSI (Post- Service Inspection) requirements, maintenance activities of measuring the thickness of curvilinear part of feederpipe and inspecting the feederpipe support area within calandria are needed to ensure continued reliable operation of nuclear power plant. And untrasonic probe is used to measure the thickness of curvilinear part of feederpipe, however workers are exposed to radioactivity irradiation during the measurement period. But, it is impossible to inspect feederpipe support area thoroughlv because of narrow and confined accessibility, that is, an inspection space between the pressure tube channels is less than 100mm and pipes in feederpipe support area are congested. And also, workers involved in inspecting feederpipe support area are under the jeopardy of high-level radiation exposure. Concerns about sliding home, which make the move of feederpipe connected to pressure tube channel smooth as pressure tube expands and contracts in its axial direction, stuck to feederpipe support and some of the structural components have made necessary the development of video inspection probe system with narrow and confined accessibility to observe and inspect feederpipe support area more close. Using video inspection probe system, it is possible to inspect and repair abnormality of feederpipe support connected to pressure tube channels of the calandria more accurate and quantative than naked eye. Therefore, that will do much for ensuring safety of CANDU-type nuclear power plant

  7. Engaging patients via mobile phone technology to assist follow-up after hospitalization in Quito, Ecuador.

    Science.gov (United States)

    Maslowsky, Julie; Valsangkar, Bina; Chung, Jennifer; Rasanathan, Jennifer; Cruz, Freddy Trujillo; Ochoa, Marco; Chiriboga, Monica; Astudillo, Fernando; Heisler, Michele; Merajver, Sofia

    2012-05-01

    Disease management following hospital discharge is difficult in most low-resourced areas, posing a major obstacle to health equity. Although mobile phones are a ubiquitous and promising technology to facilitate healthcare access, few studies have tested the acceptability and feasibility of patients themselves using the devices for assisting linkages to healthcare services. We hypothesized that patients would use mobile phones to help manage postdischarge problems, if given a communication protocol. We developed a mobile phone-based program and investigated its acceptability and feasibility as a method of delivering posthospitalization care. A consecutive cohort of adult patients in a public hospital in Quito, Ecuador was enrolled over a 1-month period. A hospital-based nurse relayed patients' discharge instructions to a community-based nurse. Patients corresponded with this nurse via text messaging and phone calls according to a protocol to initiate and participate in follow-up. Eighty-nine percent of eligible patients participated. Ninety-seven percent of participants completed at least one contact with the nurse; 81% initiated contact themselves. Nurses completed 262 contacts with 32 patients, clarifying discharge instructions, providing preventive education, and facilitating clinic appointments. By this method, 87% of patients were successfully linked to follow-up appointments. High levels of patient participation and successful delivery of follow-up services indicate the mobile phone program's acceptability and feasibility for facilitating posthospitalization follow-up. Patients actively used mobile phones to interact with nurses, enabling the provision of posthospitalization medical advice and facilitate community-based care via mobile phone.

  8. PWR reactor vessel in-service-inspection according to RSEM

    International Nuclear Information System (INIS)

    Algarotti, Marc; Dubois, Philippe; Hernandez, Luc; Landez, Jean Paul

    2006-01-01

    customers, specific techniques and tools were developed whenever deemed necessary: manipulators, probes, pusher-pullers, transducers and software products. NDT systems allow all kinds of remote-controlled acquisition and data processing. Intercontrole has performed more than 280 reactor vessel pre- and in-service inspections in France and abroad: Reactor vessel examinations in France since 1974, including more than 240 vessel pre- and in-service inspections; PSI and first ISI of Daya Bay (China) RPV. The contract for the Daya Bay first 10-year RPV ISI, to be carried out in 2005 for the unit 2 and in 2006 for the Unit 1 has been awarded; Reactor vessel examination in accordance with ASME Sections V and XI since 1981, which includes 41 reactor vessel inspections; ISI of KRSKO (Slovenia) RPV (full and partial scope), following ASME code requirements. Every year Intercontrole performs the inspection of more than 10 RPV worldwide. The paper has the following sections: Nuclear services experience; NDE capabilities and experience; Customer requirements for PWR reactor vessel in-service-inspection according to RSEM; Intercontrole solutions to comply with customer expectations; MIS manipulator; Data acquisition system; Analysis process and tools; Computer simulation. In conclusion, up to October 2005 Intercontrole successfully performed four RPV full ten-year RSEM In-Service Inspections with its new MIS. Each time the Vessel Occupation Time was lower than expected (from 10 to 20%). This proved the efficiency of the concept (manipulator + SaphirPLUS data acquisition system + Civacuve analysis software)

  9. Long-term follow-up of functional hypothalamic amenorrhea and prognostic factors.

    Science.gov (United States)

    Falsetti, Leopoldo; Gambera, Alessandro; Barbetti, Lorena; Specchia, Cristina

    2002-02-01

    This study evaluated the prognosis of functional hypothalamic amenorrhea (FHA) and the predictive factors of recovery, through a long-term follow-up. Ninety-three women affected by FHA underwent a follow-up for an average period of 8.1 yr (range 7-9 yr). At the end of the follow-up, 65 (70.7%) patients recovered. Statistical analysis showed that there was no association between recovery and anamnestic causes of FHA or with the echographic ovarian morphology but identified the predictive factors of recovery as the basal body mass index (BMI), the basal cortisol, and androstenedione plasma levels. A higher basal BMI and A, and lower cortisol values are positive prognostic factors for the recovery. Also the BMI, acquired during the follow-up, is important for FHA resolution: in fact, in recovered women the BMI increased or remained stable, whereas in nonrecovered women it decreased or remained stable. At the end of the follow-up, 52 (74.3%) patients treated with hormone replacement therapy and 8 (80%) with no therapy recovered, but only 5 (41.7%) with oral contraceptive pills recovered.

  10. Cytokines as a predictor of clinical response following hip arthroscopy: minimum 2-year follow-up.

    Science.gov (United States)

    Shapiro, Lauren M; Safran, Marc R; Maloney, William J; Goodman, Stuart B; Huddleston, James I; Bellino, Michael J; Scuderi, Gaetano J; Abrams, Geoffrey D

    2016-08-01

    Hip arthroscopy in patients with osteoarthritis has been shown to have suboptimal outcomes. Elevated cytokine concentrations in hip synovial fluid have previously been shown to be associated with cartilage pathology. The purpose of this study was to determine whether a relationship exists between hip synovial fluid cytokine concentration and clinical outcomes at a minimum of 2 years following hip arthroscopy. Seventeen patients without radiographic evidence of osteoarthritis had synovial fluid aspirated at time of portal establishment during hip arthroscopy. Analytes included fibronectin-aggrecan complex as well as a multiplex cytokine array. Patients completed the modified Harris Hip Score, Western Ontario and McMaster Universities Arthritis Index and the International Hip Outcomes Tool pre-operatively and at a minimum of 2 years following surgery. Pre and post-operative scores were compared with a paired t-test, and the association between cytokine values and clinical outcome scores was performed with Pearson's correlation coefficient with an alpha value of 0.05 set as significant. Sixteen of seventeen patients completed 2-year follow-up questionnaires (94%). There was a significant increase in pre-operative to post-operative score for each clinical outcome measure. No statistically significant correlation was seen between any of the intra-operative cytokine values and either the 2-year follow-up scores or the change from pre-operative to final follow-up outcome values. No statistically significant associations were seen between hip synovial fluid cytokine concentrations and 2-year follow-up clinical outcome assessment scores for those undergoing hip arthroscopy.

  11. Conceptual design of EAST flexible in-vessel inspection system

    International Nuclear Information System (INIS)

    Peng, X.B.; Song, Y.T.; Li, C.C.; Lei, M.Z.; Li, G.

    2010-01-01

    Remote handling technology, especially the flexible in-vessel inspection system (FIVIS) without breaking the working condition of the vacuum vessel, has been identified as one major challenge on the maintenance for the future tokamak fusion reactor. The FIVIS introduced here is specially developed for EAST superconducting tokamak that has actively cooled plasma facing components (PFCs). It aims flexible close-up inspection of EAST PFCs to help the understanding of operation issues that could occur in the vacuum vessel. This paper resumes the preliminary work of the FIVIS project, including the requirement analysis and the development of the conceptual design. The FIVIS consists out of a long reach multi-articulated manipulator and a process tool. The manipulator has a modular design for its subsystems and can reach all areas of the first wall in the distance of 15 mm and in the range of ±90 o along toroidal direction. It will be folded and hidden in the designated horizontal port during plasma discharge period.

  12. Phased array concept for the ultrasonic inservice inspection of the spherical bottom of BWR-pressure vessels

    International Nuclear Information System (INIS)

    Brekow, G.; Wuestenberg, H.; Moehrle, W.; Schulz, E.

    1989-01-01

    The spherical bottom of BWR-pressure vessels contains holes for the nozzles of control rods and instrumentation. Up to now the detectable areas for the ultrasonic inspection are the accessible ligaments between the nozzles with an orientation parallel and transverse to the manipulator rails. Some licensing authorities demand an inspection technique capable of reliably detecting significant crack initiation in all critical areas near the cladding of the spherical inner surface. By order and in cooperation with the HEW we have developed a computer controlled equipment with two ultrasonic probes containing four linear arrays and a digitized A-scan storage for documentation and evaluation of inspection results. The manipulator guided probe movement in the paths between the nozzles of the spherical bottom is controlled by a computer program. This program determines for each array system and for each coupling position the beam angle as a function of the variable skewing angle to realize detection conditions suited to possible crack positions at the longitudinal, transverse and diagonal ligaments between the nozzles for control rods and instrumentation. (orig./HP)

  13. An Explosion Aftershock Model with Application to On-Site Inspection

    Science.gov (United States)

    Ford, Sean R.; Labak, Peter

    2016-01-01

    An estimate of aftershock activity due to a theoretical underground nuclear explosion is produced using an aftershock rate model. The model is developed with data from the Nevada National Security Site, formerly known as the Nevada Test Site, and the Semipalatinsk Test Site, which we take to represent soft-rock and hard-rock testing environments, respectively. Estimates of expected magnitude and number of aftershocks are calculated using the models for different testing and inspection scenarios. These estimates can help inform the Seismic Aftershock Monitoring System (SAMS) deployment in a potential Comprehensive Test Ban Treaty On-Site Inspection (OSI), by giving the OSI team a probabilistic assessment of potential aftershocks in the Inspection Area (IA). The aftershock assessment, combined with an estimate of the background seismicity in the IA and an empirically derived map of threshold magnitude for the SAMS network, could aid the OSI team in reporting. We apply the hard-rock model to a M5 event and combine it with the very sensitive detection threshold for OSI sensors to show that tens of events per day are expected up to a month after an explosion measured several kilometers away.

  14. POST-CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 91: AREA 3 U3 fi INJECTION WELL, NEVADA TEST SITE, NEVADA FOR THE PERIOD NOVEMBER 2003 - OCTOBER 2004

    International Nuclear Information System (INIS)

    2005-01-01

    This Post-Closure Inspection and Monitoring report provides an analysis and summary of inspections, meteorological information, and neutron soil moisture monitoring for Corrective Action Unit (CAU) 91: Area 3 U-3fi Injection Well, Nevada Test Site (NTS), Nevada. This report covers the annual period November 2003 through October 2004. Site inspections of CAU 91 are performed every six months to identify any significant changes that could impact the proper operation of the waste disposal unit. Inspection results for the current period indicate that the overall condition of the concrete pad, perimeter fence, and warning signs is good

  15. Inspection program for U.S. research reactors

    International Nuclear Information System (INIS)

    Isaac, Patrick J.

    2010-01-01

    This paper presents an established program for inspection of nuclear research reactors to ensure that systems and techniques are in accordance with regulatory requirements and to provide protection for the health and safety of the public. The inspection program, implemented from the time a facility gets licensed, remains in effect through operations, shutdown, decommissioning, and until the license is terminated. The program establishes inspection methodology for operating, safeguards, and decommissioning activities. Using a performance- based approach, inspectors focus their attention on activities important to safety. Inspection procedures allow the inspectors to assess facility safety and compliance to applicable requirements. A well designed inspection program is an integral part of the mechanism to ensure that the level of performance in the strategic areas of reactor safety, radiation safety, and safeguards is acceptable and provides adequate protection of public health and safety. (author)

  16. Exploration of Postoperative Follow-up Strategies for Early Staged NSCLC Patients on the Basis of Follow-up Result of 416 Stage I NSCLC Patients after Lobectomy

    Directory of Open Access Journals (Sweden)

    Liang DAI

    2018-03-01

    Full Text Available Background and objective Currently, there is no consensus on the follow-up strategy (follow-up time interval and content of non-small cell lung cancer (NSCLC in the world, and the relevant clinical evidence is also very limited. In this study, we aimed to summarize the recurrence/metastasis sites and timings of stage I NSCLC patients based on their follow-up data, aiming to provide a basis of follow-up time interval and content for this group of patients. Methods We retrospectively analyzed the 416 stage I NSCLC patients that underwent continuous anatomic lobectomy between Jan. 2000 to Oct. 2013 in our prospective lung cancer database. According to the recurrence/metastasis sites and timings, the long term follow-up time interval and content were explored. Results The 5-yr disease free survival (DFS and overall survival (OS in the whole group were 82.4% and 85.4%, respectively. There were 76 cases (18.3% had recurrence/metastasis during follow-up, among which the most frequent site was pulmonary metastasis (21 cases, 5.0%, followed by brain metastasis (20 cases, 4.8%, bone metastasis (12 cases, 2.9%, and mediastinal lymph node metastasis (12 cases, 2.9%. Among the factors that could influence recurrence/metastasis, patients with pT2a suffered from a higher recurrence/metastasis rate compared to patients with pT1 (P=0.006, with 5-yr DFS being 73.8% and 87.3%, respectively (P=0.002, and the 5-yr OS being 77.7% and 90.3%, respectively (P=0.011. Conclusion The commonest recurrence/metastasis sites of stage I NSCLC after anatomic lobectomy are lung, brain and mediastinal lymph nodes, the risk of recurrence/metastasis within 2 years were equal to that between 3 years and 5 years. The follow-up frequencies and content within 2 years could be adjusted according to T stages.

  17. Effects of EAP follow-up on prevention of relapse among substance abuse clients.

    Science.gov (United States)

    Foote, A; Erfurt, J C

    1991-05-01

    Clients entering an employee assistance program (EAP) of a large manufacturing plant in 1985 who were assessed as having an alcohol or drug abuse problem (N = 325) were randomized into an experimental "special follow-up" group and a control "regular care" group. The regular care group received follow-up only as needed (following the usual practice of the EAP), while a follow-up counselor was hired to make routine contacts with the special follow-up group. Study intake continued through 1985, and follow-up continued through the end of 1986. Data collected on study subjects included EAP participation data, absenteeism, number of hospitalizations, health care claims paid and disability claims paid. The major study hypothesis was that EAP clients randomly allocated to special follow-up would show better results than regular care clients (i.e., would have fewer relapses, better job attendance and lower health benefit utilization during the follow-up year). The follow-up intervention was incompletely implemented due to a variety of organizational problems. Differences between the two groups on the six outcome measures were not statistically significant, although clients in the special follow-up group did show better results than clients in the regular care group on the three measures related to substance abuse. Differences on these three measures were marginally significant in regression analyses after controlling for the effects of number of follow-up visits, age, race and chronicity.

  18. Review of retention strategies in longitudinal studies and application to follow-up of ICU survivors.

    Science.gov (United States)

    Tansey, Catherine M; Matté, Andrea L; Needham, Dale; Herridge, Margaret S

    2007-12-01

    To review the literature on retention strategies in follow-up studies and their relevance to critical care and to comment on the Toronto experience with the acute respiratory distress syndrome (ARDS) and severe acute respiratory syndrome (SARS) follow-up studies. Literature review and two cohort studies in a tertiary care hospital in Toronto, Canada. ARDS and SARS patients. Review articles from the social sciences and medicine are summarized and our own experience with two longitudinal studies is drawn upon to elucidate strategies that can be successfully used to attenuate participant drop-out from longitudinal studies. Three key areas for retention of subjects are identified from the literature: (a) respect for patients: respect for their ideas and their time commitment to the research project; (b) tracking: collect information on many patient contacts at the initiation of the study and outline tracking procedures for subjects lost to follow-up; and (c) study personnel: interpersonal skills must be reinforced, flexible working hours mandated, and support offered. Our 5-year ARDS and 1-year SARS study retention rates were 86% and 91%, respectively, using these methods. Strategies to reduce patient attrition are time consuming but necessary to preserve internal and external validity. When the follow-up system is working effectively, researchers can acquire the necessary data to advance knowledge in their field and patients are satisfied that they have an important role to play in the research project.

  19. Hanford Facility Resource Conservation and Recovery Act Permit General Inspection Plan

    International Nuclear Information System (INIS)

    Beagles, D.S.

    1995-02-01

    This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility. RCRA includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 areas and the banks of the Columbia River. This plan meets the RCRA requirements and also provides for scheduling of inspections and defines general and specific items to be noted during the inspections

  20. Headache: an important factor associated with muscle soreness/pain at the two-year follow-up point among patients with major depressive disorder.

    Science.gov (United States)

    Hung, Ching-I; Liu, Chia-Yih; Yang, Ching-Hui; Wang, Shuu-Jiun

    2016-01-01

    No study has compared the associations of headache, anxiety, and depression at baseline with muscle soreness or pain (MS/P) at baseline and at the two-year follow-up point among outpatients with major depressive disorder (MDD). This study aimed to investigate the above issue. This study enrolled 155 outpatients with MDD at baseline, and 131 attended a two-year follow-up appointment. At baseline, migraine was diagnosed based on the International Classification of Headache Disorders, 2(nd) edition. MDD and anxiety disorders were diagnosed using the Structured Clinical Interview for DSM-IV-TR. The visual analog scale was used to evaluate the intensities of headache and MS/P in the neck, shoulder, back, upper limbs, and lower limbs. Depression and anxiety were evaluated using the Hospital Anxiety and Depression Scale. Multiple linear regressions were used to compare the associations of these factors with MS/P. Compared with anxiety disorders, migraine was more strongly associated with MS/P in all areas at baseline and in the upper and lower limbs at follow-up. Headache intensity at baseline was the factor most strongly associated with MS/P in all areas at baseline and follow-up after controlling for depression and anxiety. Headache intensity at baseline predicted MS/P at baseline and follow-up. Migraine and headache intensity are important factors related to MS/P at baseline and follow-up among patients with MDD. Integrating depression and headache treatment might be indicated to improve MS/P.

  1. Nuclear reactor vessel inspection apparatus

    International Nuclear Information System (INIS)

    Blackstone, E.G.; Lofy, R.A.; Williams, L.P.

    1979-01-01

    Apparatus for the in situ inspection of a nuclear reactor vessel to detect the location and character of flaws in the walls of the vessel, in the welds joining the various sections of the vessel, in the welds joining attachments such as nozzles, elbows and the like to the reactor vessel and in such attachments wherein an inspection head carrying one or more ultrasonic transducers follows predetermined paths in scanning the various reactor sections, welds and attachments

  2. Adherence to Follow-Up Recommendations by Triathlon Competitors Receiving Event Medical Care.

    Science.gov (United States)

    Joslin, Jeremy D; Lloyd, Jarem B; Copeli, Nikoli; Cooney, Derek R

    2017-01-01

    Introduction . We sought to investigate triathlete adherence to recommendations for follow-up for participants who received event medical care. Methods . Participants of the 2011 Ironman Syracuse 70.3 (Syracuse, NY) who sought evaluation and care at the designated finish line medical tent were contacted by telephone approximately 3 months after the initial encounter to measure adherence with the recommendation to seek follow-up care after event. Results . Out of 750 race participants, 35 (4.6%) athletes received event medical care. Of these 35, twenty-eight (28/35; 80%) consented to participate in the study and 17 (61%) were available on telephone follow-up. Of these 17 athletes, 11 (11/17; 65%) of participants reported that they had not followed up with a medical professional since the race. Only 5 (5/17; 29%) confirmed that they had seen a medical provider in some fashion since the race; of these, only 2 (2/17; 12%) sought formal medical follow-up resulting from the recommendation whereas the remaining athletes merely saw their medical providers coincidentally or as part of routine care. Conclusion . Only 2 (2/17; 12%) of athletes who received event medical care obtained postrace follow-up within a one-month time period following the race. Event medical care providers must be aware of potential nonadherence to follow-up recommendations.

  3. Adherence to Follow-Up Recommendations by Triathlon Competitors Receiving Event Medical Care

    Directory of Open Access Journals (Sweden)

    Jeremy D. Joslin

    2017-01-01

    Full Text Available Introduction. We sought to investigate triathlete adherence to recommendations for follow-up for participants who received event medical care. Methods. Participants of the 2011 Ironman Syracuse 70.3 (Syracuse, NY who sought evaluation and care at the designated finish line medical tent were contacted by telephone approximately 3 months after the initial encounter to measure adherence with the recommendation to seek follow-up care after event. Results. Out of 750 race participants, 35 (4.6% athletes received event medical care. Of these 35, twenty-eight (28/35; 80% consented to participate in the study and 17 (61% were available on telephone follow-up. Of these 17 athletes, 11 (11/17; 65% of participants reported that they had not followed up with a medical professional since the race. Only 5 (5/17; 29% confirmed that they had seen a medical provider in some fashion since the race; of these, only 2 (2/17; 12% sought formal medical follow-up resulting from the recommendation whereas the remaining athletes merely saw their medical providers coincidentally or as part of routine care. Conclusion. Only 2 (2/17; 12% of athletes who received event medical care obtained postrace follow-up within a one-month time period following the race. Event medical care providers must be aware of potential nonadherence to follow-up recommendations.

  4. Machine vision system for remote inspection in hazardous environments

    International Nuclear Information System (INIS)

    Mukherjee, J.K.; Krishna, K.Y.V.; Wadnerkar, A.

    2011-01-01

    Visual Inspection of radioactive components need remote inspection systems for human safety and equipment (CCD imagers) protection from radiation. Elaborate view transport optics is required to deliver images at safe areas while maintaining fidelity of image data. Automation of the system requires robots to operate such equipment. A robotized periscope has been developed to meet the challenge of remote safe viewing and vision based inspection. (author)

  5. 10 CFR 76.121 - Inspections.

    Science.gov (United States)

    2010-01-01

    ... shall provide rent-free office space for the exclusive use of Commission inspection personnel upon... provided regular plant employees, following proper identification and compliance with applicable access...

  6. Impact factors on expansion of built-up areas in Zhejiang Province, China

    Science.gov (United States)

    Liu, Dong; Zhu, Qiankun; Li, Yan; Gong, Fang

    2017-10-01

    Built-up areas are the results of human activities. Not only are they the real reflection of human and society activities, but also one of the most important input parameters for the simulation of biogeochemical cycle. Therefore, it is very necessary to map the distribution of built-up areas and monitor their changes by using new technologies and methods at high spatiotemporal resolution. By combining technologies of GIS (Geographic Information System) and RS (Remote Sensing), this study mainly explored the expansion and driving factors of built-up areas at the beginning of the 21st century in Zhejiang Province, China. Firstly, it introduced the mapping processes of LULC (Land Use and Land Cover) based on the method which combined object-oriented method and binary decision tree. Then, it analyzed the expansion features of built-up areas in Zhejiang from 2000 to 2005 and 2005 to 2010. In addition to these, potential driving factors on the expansion of built-up areas were also explored, which contained physical geographical factors, railways, highways, rivers, urban centers, elevation, and slop. Results revealed that the expansions of built-up areas in Zhejiang from 2000 to 2005 and from 2005 to 2010 were very obvious and they showed high levels of variation in spatial heterogeneity. Except those, increased built-up areas with distance to railways, highways, rivers, and urban centers could be fitted with power function (y = a*xb ), with minimum R2 of 0.9507 for urban centers from 2000 to 2005; the increased permillages of built-up areas to mean elevation and mean slop could be fitted with exponential functions (y = a*ebx), with minimum R2 of 0.6657 for mean slop from 2005 to 2010. Besides, government policy could also impact expansion of built-up areas. In a nutshell, a series of conclusions were obtained through this study about the spatial features and driving factors of evolution of built-up areas in Zhejiang from 2000 to 2010.

  7. Nimh Treatment Study of ADHD Follow-Up

    Directory of Open Access Journals (Sweden)

    J Gordon Millichap

    2004-04-01

    Full Text Available The effects of changes in medication use between 14 and 24 months follow-up on effectiveness (symptom ratings and growth (height and weight measures were analyzed, comparing 4 groups of patients, in the Multimodal Treatment Study of ADHD (MTA reported by the MTA Cooperative Group.

  8. SAFIRE - a robotic inspection system for CANDU feeders

    Energy Technology Data Exchange (ETDEWEB)

    Buckingham, R. [OC Robotics, Bristol (United Kingdom)

    2011-07-01

    The condition of primary circuit feeder pipes in CANDU reactors is relevant to the commercial viability and plant life. One known wear mechanism is external fretting between feeder pipes and adjacent services or support structures, particularly within the Upper Feeder Cabinet (UFC). Fretting leads to wall thinning which must not exceed certain agreed limits. Chafe shields have been added to protect the feeder pipes. Regular inspections are required of the chafe shields, feeder pipes and other structures that may cause feeder damage. Historically, the dose received by inspectors conducting this work has been significant. For this reason Ontario Power Generation has invested in a remotely operated robot system to conduct visual inspections within the UFC. This system, called SAFIRE for 'Snake-Arm Feeder Inspection Robot Equipment' has been deployed at Pickering during 2010 and 2011 and has been used to inspect areas that are extremely difficult to inspect with existing manual techniques. The 2011 scope of work included inspection of a total of 660 feeder pipes in three UFC quadrants, in two reactors. The full scope was completed over a one-month period in Autumn 2011 in which SAFIRE was used during 23, twelve hour shifts. This included two periods each of 72 hours of continuous operation using multiple teams of operators. SAFIRE is remote controlled delivery system for multiple cameras to record still images and video. The main system elements include a snake-arm robot mounted on a mobile vehicle. It can be controlled from up to 500m away using a fibre/copper connection. The snake-arm is 2.2m long, 25mm wide and has 18 degrees of freedom. It is designed to snake between the rows of feeder pipes to inspect feeder/hanger interfaces, both above and below the feeder cabinet catwalks. Future upgrades offer the potential to add additional tools to increase functionality. This paper describes the SAFIRE development process from inception to operational experience

  9. SAFIRE - a robotic inspection system for CANDU feeders

    International Nuclear Information System (INIS)

    Buckingham, R.

    2011-01-01

    The condition of primary circuit feeder pipes in CANDU reactors is relevant to the commercial viability and plant life. One known wear mechanism is external fretting between feeder pipes and adjacent services or support structures, particularly within the Upper Feeder Cabinet (UFC). Fretting leads to wall thinning which must not exceed certain agreed limits. Chafe shields have been added to protect the feeder pipes. Regular inspections are required of the chafe shields, feeder pipes and other structures that may cause feeder damage. Historically, the dose received by inspectors conducting this work has been significant. For this reason Ontario Power Generation has invested in a remotely operated robot system to conduct visual inspections within the UFC. This system, called SAFIRE for 'Snake-Arm Feeder Inspection Robot Equipment' has been deployed at Pickering during 2010 and 2011 and has been used to inspect areas that are extremely difficult to inspect with existing manual techniques. The 2011 scope of work included inspection of a total of 660 feeder pipes in three UFC quadrants, in two reactors. The full scope was completed over a one-month period in Autumn 2011 in which SAFIRE was used during 23, twelve hour shifts. This included two periods each of 72 hours of continuous operation using multiple teams of operators. SAFIRE is remote controlled delivery system for multiple cameras to record still images and video. The main system elements include a snake-arm robot mounted on a mobile vehicle. It can be controlled from up to 500m away using a fibre/copper connection. The snake-arm is 2.2m long, 25mm wide and has 18 degrees of freedom. It is designed to snake between the rows of feeder pipes to inspect feeder/hanger interfaces, both above and below the feeder cabinet catwalks. Future upgrades offer the potential to add additional tools to increase functionality. This paper describes the SAFIRE development process from inception to operational experience gained

  10. Intramyocardial bone marrow mononuclear cell transplantation in ischemic heart failure: Long-term follow-up.

    Science.gov (United States)

    Lehtinen, Miia; Pätilä, Tommi; Kankuri, Esko; Lauerma, Kirsi; Sinisalo, Juha; Laine, Mika; Kupari, Markku; Vento, Antti; Harjula, Ari

    2015-07-01

    Long-term results regarding treatment of chronic ischemic heart failure with bone marrow mononuclear cells (BMMCs) have been few. We received encouraging results at the 1-year follow-up of patients treated with combined coronary artery bypass grafting (CABG) and BMMCs, so we decided to extend the follow-up. The study patients had received injections of BMMCs or vehicle into the myocardial infarction border area during CABG in a randomized and double-blind manner. We could contact 36 of the 39 patients recruited for the original study. Pre-operatively and after an extended follow-up period, we performed magnetic resonance imaging, measured pro-B-type amino-terminal natriuretic peptide, reviewed patient records from the follow-up period, and determined current quality of life with the Medical Outcomes Study Short-Form 36 (SF-36) Health Survey. The median follow-up time was 60.7 months (interquartile range [IQR], 45.1-72.6 months). No statistically significant difference was detected in change of pro-B-type amino-terminal natriuretic peptide values or in quality of life between groups. The median change in left ventricular ejection fraction was 4.9% (IQR, -2.1% to 12.3%) for controls and 3.9% (IQR, -5.2% to 10.2%) for the BMMC group (p = 0.647). Wall thickening in injected segments increased by a median of 17% (IQR, -5% to 30%) for controls and 15% (IQR, -12% to 19%) for BMMC patients (p = 0.434). Scar size in injected segments increased by a median of 2% (IQR, -7% to 19%) for controls but diminished for BMMC patients, with a median change of -17% (IQR, -30% to -6%; p = 0.011). In the treatment of chronic ischemic heart failure, combining intramyocardial BMMC therapy with CABG fails to affect cardiac function but can sustainably reduce scar size, even in the long-term. Copyright © 2015 International Society for Heart and Lung Transplantation. Published by Elsevier Inc. All rights reserved.

  11. Congenital arterioportal fistulas: radiological treatment and color Doppler US follow-up

    Energy Technology Data Exchange (ETDEWEB)

    Teplisky, Dario; Tincani, Eliana Uruena; Lipsich, Jose; Sierre, Sergio [Department of Interventional Radiology, Pichincha 1890, Buenos Aires (Argentina)

    2012-11-15

    Congenital intrahepatic arterioportal fistulas (APFs) are a rare cause of portal hypertension in children. Doppler US is a useful diagnostic imaging modality. Transarterial embolization is a minimally invasive and effective therapy allowing occlusion of the fistula and restoration of liver hemodynamics. To describe the clinical and radiologic findings, percutaneous treatment and role of D-US in the postembolization follow-up of children with APF. Between 2002 and 2011, four children with APF were treated. Initial diagnosis and follow-up was performed with D-US and confirmed by arteriography, followed by endovascular embolization in all patients. D-US demonstrated abnormal arterioportal communications in all patients. Six endovascular procedures were performed in these four children. In two children, no residual fistula was seen on D-US after the first procedure and symptoms resolved. In the other two children, D-US demonstrated residual flow through the fistula, with resolution of pathological D-US findings and symptoms after the second endovascular procedure. All four children were successfully treated and asymptomatic at the end of follow-up. The mean follow-up was 24 months. Interventional radiology has a key role in the treatment of congenital APF. D-US is a noninvasive and effective tool for the diagnosis and follow-up of these patients. (orig.)

  12. What Happens Next? Follow-Up From the Children's Toddler School Program

    OpenAIRE

    Akshoomoff, Natacha; Stahmer, Aubyn C.; Corsello, Christina; Mahrer, Nicole E.

    2010-01-01

    This study was a follow-up of a group of 29 children diagnosed with autism spectrum disorders at age 2 who attended an inclusive toddler program until age 3. Children ranged in age from 4 to 12 years at the time of the parent survey and follow-up testing. The majority of children were placed in a special education (noninclusive) preschool class, but among the children who were in elementary school at the time of follow-up, 63% were in general education classroom placement. Diagnoses of autism...

  13. Inspection of licensee activities in emergency planning

    International Nuclear Information System (INIS)

    Van Binnebeek, J.J.; Gutierrez Ruiz, Luis Miguel; Bouvrie, E. des; Aro, Ilari; Gil, J.; Balloffet, Yves; Forsberg, Staffan; Klonk, H.; Lang, Hans-Guenter; Fichtinger, G.; Warren, T.; Manzella, P.; Gallo, R.; Koizumi, Hiroyoshi; Johnson, M.; Pittermann, P.

    1998-01-01

    The CNRA believes that safety inspections are a major element in the regulatory authority's efforts to ensure the safe operation of nuclear facilities. Considering the importance of these issues, the Committee has established a special Working Group on Inspection Practices (WGIP). The purpose of WGIP, is to facilitate the exchange of information and experience related to regulatory safety inspections between CNRA Member countries Following discussions at several meetings on the topic of what is expected by the regulatory body regarding inspection criteria, WGIP proposed putting together a compilation of Member countries practices on regulatory inspection practices with respect to licensee emergency planning. CNRA approved this task and this report. Information was collected from a questionnaire which was issued in 1996. The report presents information on regulatory inspection activities with respect to emergency planning in NEA Member countries. The focus of the report is on the third section. It reviews the similarities and differences in inspection practices to evaluate compliance with the requirements over which the regulatory body (RB) has jurisdiction

  14. Pressure vessel integrity and weld inspection procedure

    International Nuclear Information System (INIS)

    Solomon, K.A.; Okrent, D.; Kastenberg, W.E.

    1975-01-01

    The primary objective of this paper is to develop a simple methodology which, when coupled with existing observations on pressure vessel behavior, provides an inter-relation between pressure vessel integrity, and the parameters of the in-service inspection program, including inspection sample size, frequency and efficiency. A modified Markov process is employed and a computer code was written to obtain numerical results. The Markov process mathematically describes the following physical events. In a nuclear reactor pressure vessel weld, some defects may exist prior to the zeroth inspection (i.e., prior to vessel operation). During the zeroth inspection and repair processes, some of these defects are removed. During the first cycle of vessel operation, the existing defects may grow and some new defects may be generated. Those defects that are found at the first (and succeeding) inspection interval and warrant repair, are repaired. The above process continues through several operating cycles to the end of vessel life. During any inspection, only a portion of the welds may be inspected, and with less than perfect efficiency

  15. IAEA Concludes Follow-up Review of Malaysia Rare Earth Plant IAEA Concludes Follow-up Review of Malaysia Rare Earth Plant

    International Nuclear Information System (INIS)

    2014-01-01

    In its preliminary observations, the follow-up mission found that good progress had been made in implementing the recommendations of the 2011 mission, and noted that the radiological risks of the Lynas plant are low because of the very low level of radioactivity of the materials handled. The team also noted that Malaysia is actively updating its regulations in accordance with the most recent IAEA safety standards. The IAEA team gave some advice for further progress in specific areas. For example: The waste management plan should be based on realistic scenarios including, if considered appropriate, the identification of a final disposal site. Environmental monitoring activities should be optimised to ensure resources are focused on the most important areas, including enhancing monitoring of liquid discharges. The basis of the financial fund to be paid by Lynas for long-term waste management and decommissioning should be communicated more clearly. The AELB and Lynas are encouraged to maintain a proactive approach to relations with the media, public and other stakeholders, on an ongoing basis, to address continuing widespread misconceptions about the plant and radiation issues in general. Rare earths are elements used in many high-technology applications, from mobile phones to wind turbines. Since the ore from which they are refined also usually contains naturally occurring radioactive materials such as thorium or uranium, the process results in very low-level radioactive waste that must be managed safely. The IAEA mission's final report will be submitted to the Malaysian government at the end of October, and will be made public

  16. The value of gynecologic cancer follow-up: evidence-based ignorance?

    DEFF Research Database (Denmark)

    Lajer, Henrik; Jensen, Mette B; Kilsmark, Jannie

    2010-01-01

    To explore the extent of evidence-based data and cost-utility of follow-up after primary treatment of endometrial and ovarian cancer, addressing perspectives of technology, organization, economics, and patients.......To explore the extent of evidence-based data and cost-utility of follow-up after primary treatment of endometrial and ovarian cancer, addressing perspectives of technology, organization, economics, and patients....

  17. Balloon catheter dilatation in esophageal achalasia: long term follow-up

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Cheol Yong; Park, Hyun Mee; Kim, So Eun; Lee, Shin Hyung; Kim, Seung Hyeon; Lee, Chang Joon [National Medical Center, Seoul (Korea, Republic of)

    1994-12-15

    To evaluate the clinical efficacy of balloon catheter dilatation in the treatment of esophageal achalasia. Seven patients(three males and four females) with esopha-geal achalasia were treated with balloon catheter dilatation. Balloon catheters of variable sizes were used depending on patient's conditions. The patients were followed up over a period of 12-39 months. Balloon catheter dilatation in esophageal achalasia was successful in all patients without esophageal perforation. All patients were relieved from dysphagia. Recurrence was not found in 5 patients on long term follow-up study, but was seen in 2 patients after 18 and 21 months, respectively. Balloon catheter dilatation was a safe and effective method in the treatment of esophageal achalasia with low recurrence rate of 29% on follow-up study.

  18. Balloon catheter dilatation in esophageal achalasia: long term follow-up

    International Nuclear Information System (INIS)

    Shin, Cheol Yong; Park, Hyun Mee; Kim, So Eun; Lee, Shin Hyung; Kim, Seung Hyeon; Lee, Chang Joon

    1994-01-01

    To evaluate the clinical efficacy of balloon catheter dilatation in the treatment of esophageal achalasia. Seven patients(three males and four females) with esopha-geal achalasia were treated with balloon catheter dilatation. Balloon catheters of variable sizes were used depending on patient's conditions. The patients were followed up over a period of 12-39 months. Balloon catheter dilatation in esophageal achalasia was successful in all patients without esophageal perforation. All patients were relieved from dysphagia. Recurrence was not found in 5 patients on long term follow-up study, but was seen in 2 patients after 18 and 21 months, respectively. Balloon catheter dilatation was a safe and effective method in the treatment of esophageal achalasia with low recurrence rate of 29% on follow-up study

  19. Group anxiety management: effectiveness, perceived helpfulness and follow-up.

    Science.gov (United States)

    Cadbury, S; Childs-Clark, A; Sandhu, S

    1990-05-01

    An evaluation was conducted on out-patient cognitive-behavioural anxiety management groups. Twenty-nine clients assessed before and after the group and at three-month follow-up showed significant improvement on self-report measures. A further follow-up on 21 clients, conducted by an independent assessor at an average of 11 months, showed greater improvement with time. Clients also rated how helpful they had found non-specific therapeutic factors, and specific anxiety management techniques. 'Universality' was the most helpful non-specific factor, and 'the explanation of anxiety' was the most helpful technique.

  20. Danish offshore wind. Key environmental issues - a follow-up

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-02-15

    This follow-up to the Danish environmental monitoring programme on large-scale offshore wind power builds on the result of the former programme of 2006 and focuses on updated knowledge on harbour porpoises, water birds and fish communities, and on the cumulative effects of wind farms. The scientific quality of the projects in this follow-up has been assessed by experts from the International Advisory Panel of Experts on Marine Ecology (IAPEME), who have commented on the results in an independent evaluation which is reproduced in this publication. (LN)

  1. Benchmarking EUV mask inspection beyond 0.25 NA

    International Nuclear Information System (INIS)

    Goldberg, Kenneth A.; Mochi, Iacopo; Anderson, Erik H.; Rekawa, Seno B.; Kemp, Charles D.; Huh, S.; Han, H.-S.; Naulleau, P.; Gunion, R.F.

    2008-01-01

    The SEMATECH Berkeley Actinic Inspection Tool (AIT) is an EUV-wavelength mask inspection microscope designed for direct aerial image measurements, and pre-commercial EUV mask research. Operating on a synchrotron bending magnet beamline, the AIT uses an off-axis Fresnel zoneplate lens to project a high-magnification EUV image directly onto a CCD camera. We present the results of recent system upgrades that have improved the imaging resolution, illumination uniformity, and partial coherence. Benchmarking tests show image contrast above 75% for 100-nm mask features, and significant improvements and across the full range of measured sizes. The zoneplate lens has been replaced by an array of user-selectable zoneplates with higher magnification and NA values up to 0.0875, emulating the spatial resolution of a 0.35-NA 4 x EUV stepper. Illumination uniformity is above 90% for mask areas 2-(micro)m-wide and smaller. An angle-scanning mirror reduces the high coherence of the synchrotron beamline light source giving measured σ values of approximately 0.125 at 0.0875 NA

  2. Targeted In-service Inspections Using Risk Insights

    International Nuclear Information System (INIS)

    Kulat, S.; Montgomery, B.; Robin Graybeal, M.

    2012-01-01

    This paper includes a discussion of the historical background and rationale for development of a targeted In-service Inspection (ISI) program using risk insights, known as Risk-Informed In-service Inspection (RI-ISI). RI-ISI programs are optimized inspection programs which target specific welds for inspection based upon potential degradation mechanisms and consequences of failure. Inspections are performed on those welds that are the highest contributors to plant risk. Additionally the inspections are tailored to detect the specific postulated degradation mechanisms. As a result, the numbers of inspections are reduced along with the associated cost and radiation exposure, while maintaining or improving the level of quality and safety. Provided in this paper are the basic principles of RI-ISI program development, and a summary of the impact of the implementation of such programs. For example, implementation of a Risk-Informed In-service Inspection program results in a reduction of both cost and radiation exposure. Cost savings are estimated at between USD 1,000,000 and USD 2,300,000 per unit per ten year interval for a Class 1 and2 RI-ISI application. Cost savings are estimated based on average cost per weld of USD 7600 for examination, including the following activities: erection and removal of scaffolding, removal and replacement of insulation, removal and replacement of interferences, weld preparation, examination, documentation, craft support. Reduction in radiation exposure is estimated at 75% to 90% for a Class 1 and2 RI-ISI application. Reduction in radiation exposure is due to the following factors: number of welds selected for examination decreases by 60% to 75%, surface examinations essentially eliminated, within a given risk category, welds can be selected for examination based on additional factors such as the minimization of radiation exposure.(author).

  3. Therapeutic abortion follow-up study.

    Science.gov (United States)

    Margolis, A J; Davison, L A; Hanson, K H; Loos, S A; Mikkelsen, C M

    1971-05-15

    To determine the long-range psychological effects of therapeutic abortion, 50 women (aged from 13-44 years), who were granted abortions between 1967 and 1968 Because of possible impairment of mental and/or physical health, were analyzed by use of demographic questionnaires, psychological tests, and interviews. Testing revealed that 44 women had psychiatric problems at time of abortion. 43 patients were followed for 3-6 months. The follow-up interviews revealed that 29 patients reacted positively after abortion, 10 reported no significant change and 4 reacted negatively. 37 would definitely repeat the abortion. Women under 21 years of age felt substantially more ambivalent and guilty than older patients. A study of 36 paired pre- and post-abortion profiles showed that 15 initially abnormal tests had become normal. There was a significant increase in contraceptive use among the patients after the abortion, but 4 again became pregnant and 8 were apparently without consistent contraception. It is concluded that the abortions were therapeutic, but physicians are encouraged to be aware of psychological problems in abortion cases. Strong psychological and contraceptive counselling should be exercised.

  4. Dormaier and Chester Butte 2007 Follow-up Habitat Evaluation Procedures Report.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul R.

    2008-01-01

    Follow-up habitat evaluation procedures (HEP) analyses were conducted on the Dormaier and Chester Butte wildlife mitigation sites in April 2007 to determine the number of additional habitat units to credit Bonneville Power Administration (BPA) for providing funds to enhance, and maintain the project sites as partial mitigation for habitat losses associated with construction of Grand Coulee Dam. The Dormaier follow-up HEP survey generated 482.92 habitat units (HU) or 1.51 HUs per acre for an increase of 34.92 HUs over baseline credits. Likewise, 2,949.06 HUs (1.45 HUs/acre) were generated from the Chester Butte follow-up HEP analysis for an increase of 1,511.29 habitat units above baseline survey results. Combined, BPA will be credited with an additional 1,546.21 follow-up habitat units from the Dormaier and Chester Butte parcels.

  5. [One year follow-up after stroke. A preliminary feasibility study in the Józsefváros district of Budapest].

    Science.gov (United States)

    Szocs, Ildikó; Szatmári, Szabolcs; Fekete, Klára; Orbán-Kis, Károly; Vastagh, Ildikó; Folyovich, András; Ajtay, András; Bereczki, Dániel

    2012-03-30

    Stroke is a major public health issue in Hungary with considerable regional differences in mortality. We have limited information to explain such regional differences. To assess these differences, we would need comparative followup studies optimally carried out by personal contact with the patient or the carer. According to several epidemiological studies, follow-up can be carried out with significantly lower cost and similar efficiency by telephone contact or regular mail. In this pilot study we intend to assess: 1. the efficacy of telephone follow-up one year after stroke in this geographical region 2. whether the efficacy of follow-up can be further increased with questionnaires sent out by regular mail 3. whether telephone and mail-based assessment is sufficient to perform a larger population based study. We included 135 patients hospitalized consecutively for acute cerebrovascular disease (stroke or TIA) by the Department of Neurology, Semmelweis University in January and February of 2008. Based on residence, patients were divided into three groups: those living in the least wealthy district of Budapest (i.e. District-8); those living in other districts of the city; and those living in suburban areas. One year after the hospital treatment follow-up was possible by telephone in 76%. Further 12 patients could be contacted by questionnaire sent out by regular mail. Efficacy of follow-up was altogether 84%. Even in this small group of patients, we have found a tendency for more severe strokes (p=0.06) and higher acute case fatality (32% vs. 5%, p=0.029) in residents of District-8 of Budapest compared to those residing in more wealthy districts of the city and in suburban areas. Survival rate one year after stroke or TIA was only 39% in those living in District-8, 66% in those living in other districts and 75% in suburban dwellers (p=0.006). Telephone and mail-based questionnaires are insufficient for follow-up in these regions even when applied in combination

  6. Integration of design and inspection

    Science.gov (United States)

    Simmonds, William H.

    1990-08-01

    Developments in advanced computer integrated manufacturing technology, coupled with the emphasis on Total Quality Management, are exposing needs for new techniques to integrate all functions from design through to support of the delivered product. One critical functional area that must be integrated into design is that embracing the measurement, inspection and test activities necessary for validation of the delivered product. This area is being tackled by a collaborative project supported by the UK Government Department of Trade and Industry. The project is aimed at developing techniques for analysing validation needs and for planning validation methods. Within the project an experimental Computer Aided Validation Expert system (CAVE) is being constructed. This operates with a generalised model of the validation process and helps with all design stages: specification of product requirements; analysis of the assurance provided by a proposed design and method of manufacture; development of the inspection and test strategy; and analysis of feedback data. The kernel of the system is a knowledge base containing knowledge of the manufacturing process capabilities and of the available inspection and test facilities. The CAVE system is being integrated into a real life advanced computer integrated manufacturing facility for demonstration and evaluation.

  7. Strategies to reduce PWR inspection time

    International Nuclear Information System (INIS)

    Guerra, J.; Gonzalez, E.

    2001-01-01

    During last few years, a constant reduction in inspection time was clearly demanded by most nuclear plant owners. This requirement has to be accomplished without any impact in inspection quality that, in general, has also to be improved. All this in a market with increasing competition that forces price reductions. Under these new demands from our customers, Tecnatom reoriented its development efforts to improve his products and services to meet this challenges. Two of our main inspection activities that have clear impact in outage duration are Steam Generator and Vessel inspections. This paper describes the improvements made in these two activities as an example of the reorientation of our development efforts with a focus on the technical improvements made on the software and robotic tools applied as in the data acquisition and analysis systems. In the Steam Generator inspections, new robots with dual guide tubes are commonly used. New eddy current instruments and software were developed to keep up with the data rates produced by the faster acquisition system. Use of automatic analysis software is also helping to improve speed while reducing cost and improving overall job quality. Production rates are close to double from the previous inspection system. (author)

  8. Clinical and radiological follow-ups on onlays and overlays from student courses

    International Nuclear Information System (INIS)

    Amann, W.

    1982-01-01

    45 patients, whose teeth had been given onlays/overlays in student courses, were followed-up. The following values were measured: plaque index, sulcus bleeding index, clinical depth of the sulcus and the clinical findings for D (decayed) according to the DMF index for the maintained surfaces as well as for the control surfaces; beyond this eye tooth contact in lateral protrusion, lack of contact, approximal contact and approximal spatial orientation were evaluated. Bite wing pictures were taken and evaluated for the comprehension of iatrogenic marginal imperfections, for the control of the dentine in the area of the cervical edge of the filling and for the evaluation of the control surfaces. The maintained approximal surfaces were divided according to the degree of marginal imperfection into four imperfection groups. The data which were collected into a study list were evaluated statistically. (TRV) [de

  9. Utility of MRI in the follow-up of pyogenic spinal infection in children

    International Nuclear Information System (INIS)

    Wang, Qiuyan; Babyn, Paul; Branson, Helen; Davila, Jorge; Mueller, Edrise L.; Tran, Dat

    2010-01-01

    MRI is used at an increasing rate in evaluation of pediatric spinal infections both at the time of diagnosis and in follow-up. However, the impact of MRI in follow-up has been rarely evaluated to date. To evaluate serial follow-up spinal MRI changes compared to clinical outcome and assess their impact on clinical management. All pediatric (<18 years) patients with pyogenic spinal infection over a 9-year period with at least one follow-up after treatment were included. Atypical infections were excluded. We examined 35 whole-spine and 16 localized spinal scans from 17 patients (2 months to 16 years, 9F:8 M) who had 51 follow-ups done 2 weeks to 4.75 years after baseline. Seven children (41%) younger than 3 years underwent 33 follow-ups (65%); most required GA or sedation. Short-term follow-up scans demonstrated epidural and/or paraspinal soft-tissue changes correlating with clinical status and laboratory findings in all cases. However, MRI showed that bone and/or disc abnormalities continued and progressed in some cases despite clinical improvement. Long-term follow-up scans showed bone, disc and soft-tissue changes 1-3 years after baseline, despite children being symptom free. Extension of antibiotics occurred in 47% of children partly based on follow-up MRI. Epidural and paraspinal soft-tissue changes correlated with children's clinical symptoms. Progression of bone and disc changes can manifest despite adequate clinical response. Long-term or serial routine follow-ups were not necessary. Management should be made based on clinical response. (orig.)

  10. Attitudes among healthcare professionals towards ICT and home follow-up in chronic heart failure care.

    Science.gov (United States)

    Gund, Anna; Lindecrantz, Kaj; Schaufelberger, Maria; Patel, Harshida; Sjöqvist, Bengt Arne

    2012-11-28

    eHealth applications for out-of-hospital monitoring and treatment follow-up have been advocated for many years as a promising tool to improve treatment compliance, promote individualized care and obtain a person-centred care. Despite these benefits and a large number of promising projects, a major breakthrough in everyday care is generally still lacking. Inappropriate organization for eHealth technology, reluctance from users in the introduction of new working methods, and resistance to information and communication technology (ICT) in general could be reasons for this. Another reason may be attitudes towards the potential in out-of-hospital eHealth applications. It is therefore of interest to study the general opinions among healthcare professionals to ICT in healthcare, as well as the attitudes towards using ICT as a tool for patient monitoring and follow-up at home. One specific area of interest is in-home follow-up of elderly patients with chronic heart failure (CHF). The aim of this paper is to investigate the attitudes towards ICT, as well as distance monitoring and follow-up, among healthcare professionals working with this patient group. This paper covers an attitude survey study based on responses from 139 healthcare professionals working with CHF care in Swedish hospital departments, i.e. cardiology and medicine departments. Comparisons between physicians and nurses, and in some cases between genders, on attitudes towards ICT tools and follow-up at home were performed. Out of the 425 forms sent out, 139 were collected, and 17 out of 21 counties and regions were covered in the replies. Among the respondents, 66% were nurses, 30% physicians and 4% others. As for gender, 90% of nurses were female and 60% of physicians were male. Internet was used daily by 67% of the respondents. Attitudes towards healthcare ICT were found positive as 74% were positive concerning healthcare ICT today, 96% were positive regarding the future of healthcare ICT, and 54% had high

  11. Early Primary Care Provider Follow-up and Readmission After High-Risk Surgery

    Science.gov (United States)

    Brooke, Benjamin S.; Stone, David H.; Cronenwett, Jack L.; Nolan, Brian; DeMartino, Randall R.; MacKenzie, Todd A.; Goodman, David C.; Goodney, Philip P.

    2014-01-01

    IMPORTANCE Follow-up with a primary care provider (PCP) in addition to the surgical team is routinely recommended to patients discharged after major surgery despite no clear evidence that it improves outcomes. OBJECTIVE To test whether PCP follow-up is associated with lower 30-day readmission rates after open thoracic aortic aneurysm (TAA) repair and ventral hernia repair (VHR), surgical procedures known to have a high and low risk of readmission, respectively. DESIGN, SETTING, AND PARTICIPANTS In a cohort of Medicare beneficiaries discharged to home after open TAA repair (n = 12 679) and VHR (n = 52 807) between 2003 to 2010, we compared 30-day readmission rates between patients seen and not seen by a PCP within 30 days of discharge and across tertiles of regional primary care use. We stratified our analysis by the presence of complications during the surgical (index) admission. MAIN OUTCOMES AND MEASURES Thirty-day readmission rate. RESULTS Overall, 2619 patients (20.6%) undergoing open TAA repair and 4927 patients (9.3%) undergoing VHR were readmitted within 30 days after surgery. Complications occurred in 4649 patients (36.6%) undergoing open TAA repair and 4528 patients (8.6%) undergoing VHR during their surgical admission. Early follow-up with a PCP significantly reduced the risk of readmission among open TAA patients who experienced perioperative complications, from 35.0% (without follow-up) to 20.4% (with follow-up) (P < .001). However, PCP follow-up made no significant difference in patients whose hospital course was uncomplicated (19.4% with follow-up vs 21.9% without follow-up; P = .31). In comparison, early follow-up with a PCP after VHR did not reduce the risk of readmission, regardless of complications. In adjusted regional analyses, undergoing open TAA repair in regions with high compared with low primary care use was associated with an 18% lower likelihood of 30-day readmission (odds ratio, 0.82; 95% CI, 0.71–0.96; P = .02), whereas no significant

  12. 46 CFR 153.812 - Inspection for Certificate of Inspection.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Inspection for Certificate of Inspection. 153.812... CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Testing and Inspection § 153.812 Inspection for Certificate of Inspection. The rules governing the...

  13. [A follow-up study of six years' outcome of children with asthma in urban area of Beijing].

    Science.gov (United States)

    Tian, C Y; Sha, L; Liu, C H; Luo, Y Q; Li, S; Zhao, M Y; Wang, W; Chen, Y Z

    2018-03-02

    Objective: To understand the outcome of asthma in children from urban area of Beijing and the factors associated with the outcome. Methods: A total of 497 children with asthma diagnosed in the epidemiological survey of childhood asthma in urban area of Beijing in 2010 were selected in this study. Telephone follow-up was conducted in 2016 to obtain information about asthma attack, emergency visit, hospitalization, medication and disease control, and data of comorbidities of allergic diseases from 1 year earlier. Enumeration data were compared using chi-square test, measurement data were compared by rank sum test. The multi-factor logistic regression analysis was employed for the relationship between the related factors and asthma, Kaplan-Meier survival analysis and COX regression was employed to understand the relationship between the related factors and the course of the disease. Results: Questionnaires were conducted in 366 children, of whom 66.7% (244/366) were male, and 33.3% (122/366) were female.Compared with 2010, the rate of asthma attack and emergency room visits in children in last 12 months were significantly lower (19.1%(70/366) vs . 57.1%(284/497), and 3.0% (11/366) vs .19.7% (98/497), χ(2)=125.910 and 53.352, both P0.05). The number of children with clinical remission (2 years and above) was 75.4% (276/366). The number of children without remission within 2 years was 24.6% (90/366). The majority of children without remission were less than 12 years old boys (52.4% (33/63) vs . 30.9% (56/181) , χ(2)=9.273, Pasthma (68.9%(62/90)) was higher than that of children with remission (51.8%(143/276), 17.0%(47/276), and 54.7%(151/276), respectively, χ(2)=7.013, 7.079, 5.608, respectively, all P3-6 years old vs . 0-3 years old), OR= 2.630(>6 years old vs . 0-3 years old), χ(2)=18.512, 31.371, 6.510, all Pasthma remission. COX regression analysis showed that the use of control drugs ( HR =0.705 (0.515-0.964), χ(2)=4.795, Pasthma in children in Beijing city in

  14. Neuro-Behcet's disease: initial and follow-up MR imaging findings

    International Nuclear Information System (INIS)

    Kim, Chan Sung; Choi, Sun Seob; Lee, Ha Jong; Ha, Dong Ho; Lee, Yong Il

    1998-01-01

    The purpose of this study was to evaluate initial and follow-up MR imaging(MRI) findings of neuro-Behcet's disease. MRI of seven clinically diagnosed cases of neuro-Behcet's disease were retrospectively analysed in terms of involved site, pattern, signal intensity, contrast enhancement pattern and changes seen on follow-up. Using a 0.35T or 1.0T unit T2-and T1-weighted spin-echocontrast-enhanced images were obtained in six patients. Follow-up MRI after steroid therapy lastion between two weeks and 16 months was performed in six patients. Lesions involved the midbrain(6/7), pons(5/7), thalamus(4/7), medulla oblongata(3/7), tegmentum(3/7), internal capsule(3/7), middle cerebellar peduncle(2/7), dentate nucleus(1/7), basal ganglia(1/7) and temporal lobe(1/7). They were 1-3cm in size, and their shape was ill-defined and patchy. Inhomogeneous high and low signal-intensity was seen on T2-weighted and T1-weighted images, respectively. In two of six cases there was focal mild patchy enhancement. Euring follow-up lasting for between two weeks and 16 months after steroid therapy, the lesions decreased in extent(n=3D5) or disappeared(n=3D1), and in the brainstem, focal brain atrophy occurred in three cases. Although MRI findings of neuro-Behcet's disease are nonspecific, common involvement of the brainstem, tegmentum and internal capsule, as well as improvement on follow-up MRI, may be helpful diagnostic indicators of this condition.=20

  15. A Follow-Up Study of the Deaf.

    Science.gov (United States)

    Reich, P. A.; Reich, C. M.

    Followed up through interviews and questionnaires were 278 former students, average age 28 years, of two residential schools and one day school for the deaf in Ontario. Data was collected on the degree of hearing loss, use of a hearing aid, educational and occupational history, social integration, methods of communication, and attitudes toward…

  16. Field experience of cleanliness inspection for secondary-side in PWR steam generators

    International Nuclear Information System (INIS)

    Ding Xunshen

    1997-05-01

    The mechanical cleaning and TV inspection technology for secondary-side in steam generators of Daya Bay Nuclear Power Plant has been used for preventing the heat transfer tubes from damage caused by residues in steam generator and foreign objects. A lancing has been used for steam generators. The high-pressure jet sent from the central lane to the inside of the bundle has two objectives: (a) the mechanical energy in the jet breaks up the deposit, and (b) the particles are then carried to the periphery of the generator, where they are collected by a water circulation system. The TV inspection consists of the inspection before lancing and after lancing. The former includes the inspection of outer tube lane and central tube lane, and the extraction of foreign objects; the latter includes the inspection of inter tube area, outer tube lane and central tube lane, and the extraction of foreign objects. Video cassette are visualized by a specialist who is qualified to realize a map representative of the cleanliness state of the tubesheet, and to judge if it is or not acceptable. The TV inspection obtained a cleanliness conclusion according to acceptance criteria. So, it is important to work out cleanliness acceptance criteria suit for every operation stages. The site practices shown that after lancing, although hard deposit existed and height of hard deposit in some local place exceeded 5 mm, but the sludge remaining on tubesheet was less. If we can conduct periodic lancing to steam generator, the increase rate of hard deposit will be small. (7 refs., 12 figs.)

  17. Control of the Saclay CEA's base nuclear installations - Inspection n. INS-2010-CEASAC-0006 31 May 2010-4 June 2010 - Safety management

    International Nuclear Information System (INIS)

    2010-01-01

    This document reports an inspection dedicated to safety management, and performed by the ASN (the French Nuclear Safety Authority) on several nuclear installations present on the CEA's Saclay site. The inspected installations have been the INBs (base nuclear installations) number 35 (STEL), 40 (Osiris), 49 (LHA), 50 (LECI), 77 (Poseidon) and 101 (Orphee), and four departments (CCSIMN, USL2TI, SP2S and DANS) involved in safety or in charge of it. The report describes the requested corrective actions about the quality of the internal diagnosis, about the follow-up of actions and directives, about internal authorizations, about the follow-up of commitments, about second level control, about the management of the return on experience, about interesting events, about the control of subcontractors. Some additional information requests are also formulated

  18. Nuclear Experts Complete IAEA Follow-up Review of German Regulatory System

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: Nuclear safety experts concluded a seven-day mission to review the German Regulatory System, conducted from 4-10 September in Bonn, Stuttgart and Berlin. At the request of the Government of the Federal Republic of Germany, the International Atomic Energy Agency assembled a peer-review team of six high-level regulatory experts from six nations (Finland, France, the Netherlands, Switzerland, the UK, the US and three IAEA senior staff members) to conduct a follow-up assessment of an Integrated Regulatory Review Service (IRRS) mission conducted in 2008. This follow-up IRRS mission examined the progress in acting upon the recommendations and suggestions made during the 2008 IRRS mission and reviewed the areas of significant regulatory changes since that review at both the Federal Ministry of Environment, Nature Conservation and Nuclear Safety (BMU) and the Ministry of Environment of the federal state of Baden-Wurttemberg (UM BW). The first mission reviewed Germany's regulatory framework against IAEA Safety Standards and fostered the exchange of information and experience on safety regulation. This is a peer review based on IAEA Standards. It is not an inspection, nor an audit. The scope of the mission was limited to the safety regulation of nuclear power plants. IRRS team leader, Mr. McCree, of the US Nuclear Safety Commission (USNRC), said, ''This was an important IRRS mission, particularly given the recent Fukushima Daiichi Nuclear Power Plant accident and the related insights which underscore the importance of having an independent, credible nuclear safety regulator.'' ''The IRRS team identified several strengths of the German nuclear safety regulators, including the prompt and coordinated incident response activities of BMU and UM BW to the Fukushima accident. Some suggestions were also made to further strengthen nuclear safety regulations concerning the future work of BMU,'' he said. The review team found that important progress has been made toward

  19. Follow-up of breast cancer by bone scintigraphy

    International Nuclear Information System (INIS)

    Garcia N, E.; Castro, F.; Miranda, R.; Leon, L.; Bustamante, G.; Escobar, M.

    2004-01-01

    Full text: Breast cancer is one of the most common cancers in women. It is the second most widespread cancer in Mexican women. Among the several methods for diagnosis and follow up of the disease, tumor markers like CA-53 have high sensitivity and specificity. Bone scan is a useful method in the detection of bone metastases. In comparison to other diagnostic modalities, bone scan is more sensitive and less expensive for detection of early bone abnormalities and hence to select an appropriate treatment for better prognosis. In our country, in about 70% of cases diagnosis of breast cancer is made when the disease is in an advanced state - states III and IV. The aim of this study was to evaluate the follow up of breast cancer by bone scans and to correlate these findings with the stage of the disease and other diagnostic modalities. The work was carried out at Mexican General Hospital. A total of 350 patients with breast tumor were included; bone scans were performed in all patients at the time of clinical diagnosis and at every 6 months for a period of 1 to 5 years using an Elscint APEX SP6 HR gamma camera coupled with ultra high resolution collimator. Scan was performed 2-3 hours after intravenous administration of 555-925 MBq of Tc-99m methyl diphosphonate. Tumor classification was made according to TNM criteria. Serum levels of alkaline phosphates, carcino-embrionic antigen (CEA) and Ca 53 were also measured on the same day. Fifty-one patients confirmed to have a diagnosis of benign breast were excluded from the study group. Of the remaining 299 patients, 89 (39%) were between 41 years to 50 years, 69 between 51 to 60 years. The clinical stage most commonly observed was stage III (n=164, 54%) followed by stage II (25%). In 59.5% of patients, scintigraphy showed bone metastasis. Four patients with bone metastases showed regression and 42 (14%) with negative scans became positive on follow up bone scans. Ninety-three patients were free of bone metastases during all

  20. Improved plant availability by advanced condition based inspections

    International Nuclear Information System (INIS)

    Hulshof, Harry J.M.; Noteboom, Jan W.; Welberg, Paul G.M.; Bruijn, Leo E.

    2004-01-01

    An industrial plant has to operate safely, reliably and efficiently at the lowest possible cost. Plant availability plays an important role regarding economic life optimisation. Industrial installations that are under pressure and are operating at high temperatures have a limited life due to creep and fatigue. It is, therefore, of critical importance to know the location of any possible weak spots in the installation. To avoid safety risks, unplanned plant shutdown and, as a consequence, high costs for unavailability, cycling and repair, periodic inspections and strain measurements are recommended. A Speckle Image Correlation Analysis (SPICA) system enables on-stream measurement of deformation due to creep in critical areas like the heat-affected zone in welds. Plant management and operators use the strain measurements to take action when necessary and, consequently, prevent failures. In those plants that have been provided with SPICA-technology for some years plant availability has improved significantly as a result. Another important development for yielding improved availability concerns steam drums. During some 20 years, KEMA has been performing automated ultrasonic steam drum inspections from outside. The Dutch authorities accepted this methodology in this period as an alternative (rather than an addition) after several pilot projects. An advantage of this inspection methodology is the possibility to record of the inspection results and possibility of thus trending these data. The resulting reduction of through time appeared a major benefit for plant owners. Since the authorities adopted the RBI approach during the last 10 years, another advantage of the inspection methodology became apparent: complete scanning and recording of the inspection data of circumferential and longitudinal (butt and fillet) welds, inspection of nozzle welds and inner radius as well as corrosion mapping has been covering all higher risk areas in these drums. This enhanced inspection

  1. Improved plant availability by advanced condition based inspections

    Energy Technology Data Exchange (ETDEWEB)

    Hulshof, Harry J.M.; Noteboom, Jan W; Welberg, Paul G.M.; Bruijn, Leo E

    2004-06-01

    An industrial plant has to operate safely, reliably and efficiently at the lowest possible cost. Plant availability plays an important role regarding economic life optimisation. Industrial installations that are under pressure and are operating at high temperatures have a limited life due to creep and fatigue. It is, therefore, of critical importance to know the location of any possible weak spots in the installation. To avoid safety risks, unplanned plant shutdown and, as a consequence, high costs for unavailability, cycling and repair, periodic inspections and strain measurements are recommended. A Speckle Image Correlation Analysis (SPICA) system enables on-stream measurement of deformation due to creep in critical areas like the heat-affected zone in welds. Plant management and operators use the strain measurements to take action when necessary and, consequently, prevent failures. In those plants that have been provided with SPICA-technology for some years plant availability has improved significantly as a result. Another important development for yielding improved availability concerns steam drums. During some 20 years, KEMA has been performing automated ultrasonic steam drum inspections from outside. The Dutch authorities accepted this methodology in this period as an alternative (rather than an addition) after several pilot projects. An advantage of this inspection methodology is the possibility to record of the inspection results and possibility of thus trending these data. The resulting reduction of through time appeared a major benefit for plant owners. Since the authorities adopted the RBI approach during the last 10 years, another advantage of the inspection methodology became apparent: complete scanning and recording of the inspection data of circumferential and longitudinal (butt and fillet) welds, inspection of nozzle welds and inner radius as well as corrosion mapping has been covering all higher risk areas in these drums. This enhanced inspection

  2. The positive effect of posterolateral lumbar spinal fusion is preserved at long-term follow-up: a RCT with 11-13 year follow-up

    DEFF Research Database (Denmark)

    Andersen, Thomas; Videbaek, Tina S; Hansen, Ebbe S

    2008-01-01

    outcome parameter. RESULTS: Follow-up was 83% of the original study population (107 patients). Average follow-up time was 12 years (range 11-13 years). DPQ-scores were significantly lower than preoperatively in both groups (P ... had retired due to low back pain had poorer outcome than patients retired for other reasons, best outcome was seen in patients still at work (P = 0.01 or less in all questionnaires, except SF-36 MCS P = 0.08). DISCUSSION: Improvement in functional outcome is preserved for 10 or more years after...

  3. Electronic Detection of Delayed Test Result Follow-Up in Patients with Hypothyroidism.

    Science.gov (United States)

    Meyer, Ashley N D; Murphy, Daniel R; Al-Mutairi, Aymer; Sittig, Dean F; Wei, Li; Russo, Elise; Singh, Hardeep

    2017-07-01

    Delays in following up abnormal test results are a common problem in outpatient settings. Surveillance systems that use trigger tools to identify delayed follow-up can help reduce missed opportunities in care. To develop and test an electronic health record (EHR)-based trigger algorithm to identify instances of delayed follow-up of abnormal thyroid-stimulating hormone (TSH) results in patients being treated for hypothyroidism. We developed an algorithm using structured EHR data to identify patients with hypothyroidism who had delayed follow-up (>60 days) after an abnormal TSH. We then retrospectively applied the algorithm to a large EHR data warehouse within the Department of Veterans Affairs (VA), on patient records from two large VA networks for the period from January 1, 2011, to December 31, 2011. Identified records were reviewed to confirm the presence of delays in follow-up. During the study period, 645,555 patients were seen in the outpatient setting within the two networks. Of 293,554 patients with at least one TSH test result, the trigger identified 1250 patients on treatment for hypothyroidism with elevated TSH. Of these patients, 271 were flagged as potentially having delayed follow-up of their test result. Chart reviews confirmed delays in 163 of the 271 flagged patients (PPV = 60.1%). An automated trigger algorithm applied to records in a large EHR data warehouse identified patients with hypothyroidism with potential delays in thyroid function test results follow-up. Future prospective application of the TSH trigger algorithm can be used by clinical teams as a surveillance and quality improvement technique to monitor and improve follow-up.

  4. An audit of follow-up chest radiography after coronary artery bypass graft

    Energy Technology Data Exchange (ETDEWEB)

    Karthik, S. [Department of Cardiothoracic Surgery, Yorkshire Heart Centre, Leeds General Infirmary, Leeds (United Kingdom); O' Regan, D.J. [Department of Cardiothoracic Surgery, Yorkshire Heart Centre, Leeds General Infirmary, Leeds (United Kingdom)]. E-mail: regan@leedsth.nhs.uk

    2006-07-15

    AIM: To investigate the clinical value and audit chest radiography, which is currently undertaken as part of routine practice, in the follow-up of coronary artery bypass graft (CABG) patients. MATERIAL AND METHODS: Six hundred and sixty-six first time CABG patients were identified from the Patient Analysis and Tracking System database representing the work of a single surgeon between February 2001 and September 2005. The data regarding the clinical and radiological findings on follow-up were collected from the follow-up clinic letters and case notes. Any need for re-admission/intervention was also noted. RESULTS: Of the 666 patients, 11 died and a further 10 either refused or failed to arrive for follow-up. Chest radiography was undertaken in 645 patients. Only 13 patients (2%) were found to have an abnormality on chest radiography. In all cases this was a pleural effusion that was confirmed on clinical examination in seven patients (53.9%) patients. Only one patient needed re-admission and intervention. In this case the effusion had been noted on clinical examination. Seven patients were discharged and the remaining five were followed up with repeat chest radiography before discharge. Seventy-four patients had a respiratory complication postoperatively, but only three had any evidence of an effusion on follow-up. CONCLUSION: The diagnostic yield of a routine chest radiography in a CABG follow-up clinic is low (2%) and the need for intervention is rare and is determined by clinical examination. The practice of routine radiography in this group of patients has now stopped and follow-up audit will be conducted in 12 months.

  5. Post-Discharge Follow-Up Visits and Hospital Utilization

    Data.gov (United States)

    U.S. Department of Health & Human Services — Analysis reported in Post-Discharge Follow-Up Visits and Hospital Utilization by Medicare Patients, 2007-2010, published in Volume 4, Issue 2 of Medicare and...

  6. Post-Closure Inspection Report for Corrective Action Unit 427: Septic Waste Systems 2 and 6 Tonopah Test Range, Nevada Calendar Year 2000; TOPICAL

    International Nuclear Information System (INIS)

    K. B. Campbell

    2001-01-01

    Post-closure inspection requirements for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit[CAU] 427) (Figure 1) are described in Closure Report for Corrective Action Unit 427. Area 3 Septic Waste Systems 2 and 6. Tonopah Test Range, Nevada, report number DOE/NV-561. The Closure Report (CR) was submitted to the Nevada Division of Environmental Protection (NDEP) on August 16, 1999. The CR (containing the Post-Closure Inspection Plan) was approved by the NDEP on August 27, 1999. The annual post-closure inspection at CAU 427 consists of the following: Verification of the presence of all leachfield and septic tank below-grade markers; Verification that the warning signs are in-place, intact, and readable; and Visual observation of the soil and asphalt cover for indications of subsidence, erosion, and unauthorized use. The site inspections were conducted on June 20, 2000, and November 21, 2000. All inspections were made after NDEP approval of the CR and were conducted in accordance with the Post-Closure Inspection Plan in the NDEP-approved CR. No maintenance or repairs were conducted at the site. This report includes copies of inspection checklists, photographs, recommendations, and conclusions. Copies of the Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachments C

  7. Posttreatment follow-up of radiation oncology patients in a managed care environment

    International Nuclear Information System (INIS)

    Steinberg, Michael L.; Rose, Christopher M.

    1996-01-01

    Purpose: Health care delivery in the United States is in the midst of a structural revolution called managed care. Demands for cost control within the managed care environment force radiation oncologists to defend the need and obligation to follow their patients. Methods and Materials: We have analyzed this follow-up requirement from six potential justifications: patient care, medical-legal, quality assurance, outcome measurement, cost, and improvement of care. Results: Practical recommendations for discussing the need for follow-up with the medical directors and primary care physicians of managed care entities are given. Follow-up without valid documentation of benefit is hard to justify in this era of managed care. Conclusions: Collaborative follow-up between the referring physician, the treating radiation oncologist, and the other oncologic specialists will allow for outcome measurement and improvement in practice without driving up cost or exposing the patient to undue risk.

  8. FY04 Inspection Results for Wet Uruguay Fuel in L-Basin

    Energy Technology Data Exchange (ETDEWEB)

    VORMELKER, PHILIP

    2005-09-01

    The 2004 visual inspection of four Uruguay nuclear fuel assemblies stored in L-Basin was completed. This was the third inspection of this wet stored fuel since its arrival in the summer of 1998. Visual inspection photographs of the fuel from the previous and the recent inspections were compared and no evidence of significant corrosion was found on the individual fuel plate photographs. Fuel plates that showed areas of pitting in the cladding during the original receipt inspection were also identified during the 2004 inspection. However, a few pits were found on the non-fuel aluminum clamping plates that were not visible during the original and 2001 inspections.

  9. Follow-up skeletal surveys for nonaccidental trauma: can a more limited survey be performed?

    Energy Technology Data Exchange (ETDEWEB)

    Harlan, Susan R. [University of Utah School of Medicine, Department of Radiology, Salt Lake City, UT (United States); Nixon, G.W.; Prince, Jeffrey S. [Primary Children' s Medical Center, Department of Medical Imaging, Salt Lake City, UT (United States); Campbell, Kristine A.; Hansen, Karen [University of Utah School of Medicine, Department of Pediatrics, Salt Lake City, UT (United States)

    2009-09-15

    Studies have demonstrated the value of the follow-up skeletal survey in identifying additional fractures, clarifying indeterminate findings, and improving dating of skeletal injuries in victims of physical abuse. To determine whether a more limited follow-up survey could yield the same radiologic data as a full follow-up survey. The study cohort comprised 101 children who had follow-up surveys that met our inclusion criteria. Consensus readings of both original and follow-up surveys were performed by two pediatric radiologists. These results were compared to determine additional findings from the follow-up surveys. Limited skeletal survey protocols were evaluated to determine whether they would detect the same fractures seen with a complete osseous survey. In the 101 children 244 fractures were identified on the initial osseous survey. Follow-up surveys demonstrated new information in 38 children (37.6%). A 15-view limited follow-up survey identified all additional information seen on the complete follow-up survey. Our data demonstrate that a 15-view limited follow-up skeletal survey could be performed without missing clinically significant new fractures and still allow proper identification of confirmed fractures or normal findings. A limited survey would decrease radiation dose in children. (orig.)

  10. Follow-up skeletal surveys for nonaccidental trauma: can a more limited survey be performed?

    International Nuclear Information System (INIS)

    Harlan, Susan R.; Nixon, G.W.; Prince, Jeffrey S.; Campbell, Kristine A.; Hansen, Karen

    2009-01-01

    Studies have demonstrated the value of the follow-up skeletal survey in identifying additional fractures, clarifying indeterminate findings, and improving dating of skeletal injuries in victims of physical abuse. To determine whether a more limited follow-up survey could yield the same radiologic data as a full follow-up survey. The study cohort comprised 101 children who had follow-up surveys that met our inclusion criteria. Consensus readings of both original and follow-up surveys were performed by two pediatric radiologists. These results were compared to determine additional findings from the follow-up surveys. Limited skeletal survey protocols were evaluated to determine whether they would detect the same fractures seen with a complete osseous survey. In the 101 children 244 fractures were identified on the initial osseous survey. Follow-up surveys demonstrated new information in 38 children (37.6%). A 15-view limited follow-up survey identified all additional information seen on the complete follow-up survey. Our data demonstrate that a 15-view limited follow-up skeletal survey could be performed without missing clinically significant new fractures and still allow proper identification of confirmed fractures or normal findings. A limited survey would decrease radiation dose in children. (orig.)

  11. Long-term follow-up after bariatric surgery in a national cohort.

    Science.gov (United States)

    Thereaux, J; Lesuffleur, T; Païta, M; Czernichow, S; Basdevant, A; Msika, S; Millat, B; Fagot-Campagna, A

    2017-09-01

    Lifelong medical follow-up is mandatory after bariatric surgery. The aim of this study was to assess the 5-year follow-up after bariatric surgery in a nationwide cohort of patients. All adult obese patients who had undergone primary bariatric surgery in 2009 in France were included. Data were extracted from the French national health insurance database. Medical follow-up (medical visits, micronutrient supplementation and blood tests) during the first 5 years after bariatric surgery was assessed, and compared with national and international guidelines. Some 16 620 patients were included in the study. The percentage of patients with at least one reimbursement for micronutrient supplements decreased between the first and fifth years for iron (from 27.7 to 24.5 per cent; P bariatric surgery is poor, especially for young men with poor early follow-up. © 2017 BJS Society Ltd Published by John Wiley & Sons Ltd.

  12. Follow-up of AECL employees involved in the decontamination of NRU in 1958

    International Nuclear Information System (INIS)

    Werner, M.M.; Myers, D.K.; Morrison, D.P.

    1982-09-01

    In May 1958 the NRU reactor hall was badly contaminated by a damaged fuel rod that broke apart during its removal from the reactor. Radioactive fission products were spread around the reactor hall and into adjacent areas when a piece of the fuel rod fell into the maintenance pit and burned. AECL staff and others completed the decontamination in 2 1/2 months. This paper reports the results of a follow-up study of the AECL participants. No statistically significant increases in deaths from cancer or other diseases were found in this group

  13. Motivators and barriers to uptake of post-operative voluntary medical male circumcision follow-up in Yala division, Siaya County, Kenya.

    Science.gov (United States)

    Abunah, Bonface; Onkoba, Rueben; Nyagero, Josephat; Muhula, Samuel; Omondi, Edward; Guyah, Bernard; Omondi, Gregory Barnabas

    2016-01-01

    Follow-up visits are recommended to all voluntary medical male circumcision clients (VMMC), however, adherence is variable. High lost-to-follow-up cases limit knowledge about clinical status of clients and adverse events. This study sought to establish Motivators and Barriers to the Uptake of VMMC post-operative follow-up services in Siaya County, Kenya. 277 clients from five VMMC sites in Yala were recruited immediately post-operation to participate in a telephone interview between the 21st and 31st day post-surgery during which a semi-structured questionnaire was administered. Descriptive and inferential statistics was used to analyse quantitative information using SPSS while responses from open ended questions were grouped into themes, sieved out, coded and analyzed. 137(49.5%) of the 277 participants utilized the follow-up services. Health education (31.4%) and emergency reviews/adverse events (24.1%) were the main motivation for returning for follow-up while occupational and other engagements (29.7%) and presumption of healing (24.6%) were the main barriers. Type of facility attended (p=0.0173), satisfaction with the discharge process (p=0.0150) and residency in Yala (p<0.001) were statistically significant to the respondents' return for follow-up. 85(62.0%) of the participants returned on the 7th day, 9(6.6%) returned after 7 days, and 43(31.4%) returned before 7 days. VMMC health education should include and emphasize the benefits of follow-up care to the clients and the providers should address the barriers to accessing follow-up services. Our results will inform the programme on areas identified to improve care for VMMC clients and reduce subsequent lost-to-follow-up cases.

  14. Seven-year follow-up of percutaneous closure of patent foramen ovale.

    Science.gov (United States)

    Mirzada, Naqibullah; Ladenvall, Per; Hansson, Per-Olof; Johansson, Magnus Carl; Furenäs, Eva; Eriksson, Peter; Dellborg, Mikael

    2013-12-01

    Observational studies favor percutaneous closure of patent foramen ovale (PFO) over medical treatment to reduce recurrent stroke while randomized trials fail to demonstrate significant superiority of percutaneous PFO closure. Few long-term studies are available post PFO closure. This study reports long-term clinical outcomes after percutaneous PFO closure. Between 1997 and 2006, 86 consecutive eligible patients with cerebrovascular events, presumably related to PFO, underwent percutaneous PFO closure. All 86 patients were invited to a long-term follow-up, which was carried out during 2011 and 2012. Percutaneous PFO closure was successfully performed in 85 of 86 patients. The follow-up rate was 100%. No cardiovascular or cerebrovascular deaths occurred. Two patients (both women) died from lung cancer during follow-up. Follow-up visits were conducted for 64 patients and the remaining 20 patients were followed up by phone. The mean follow-up time was 7.3 years (5 to 12.4 years). Mean age at PFO closure was 49 years. One patient had a minor stroke one month after PFO closure and a transient ischemic attack (TIA) two years afterwards. One other patient suffered from a TIA six years after closure. No long-term device-related complications were observed. Percutaneous PFO closure was associated with very low risk of recurrent stroke and is suitable in most patients. We observed no mortality and no long-term device-related complications related to PFO closure, indicating that percutaneous PFO closure is a safe and efficient treatment even in the long term.

  15. Passive versus active follow-up to investigate the efficacy of primary prevention programs

    Directory of Open Access Journals (Sweden)

    Högel, Josef

    2005-04-01

    Full Text Available Before general application of a primary prevention program its efficacy has to be demonstrated. For this purpose a randomized controlled trial with active or passive follow-up may be conducted. In the last 5 years, the ratio of controlled trials with passive versus those with active follow-up was 1:13. However, under certain circumstances a passive follow-up may be more appropriate and useful to overcome the drawbacks of an active follow-up, as e.g. high costs and many drop-outs. In a randomized controlled trial, a passive follow-up is based on the reporting of cases by physicians or hospitals instead of actively following up all study participants individually. The statistical evaluation can be carried out using a one-sample chi2-test. Advantages and limitations are discussed. A passive follow-up may be advantageous in situations with low incidence, large number of participants, complete ascertainment of conditions with obligatory notification or effective disease registries and should be preferred in such a context.

  16. Common QA/QM Criteria for Multinational Vendor Inspection

    International Nuclear Information System (INIS)

    2014-01-01

    This VICWG document provides the 'Common QA/QM Criteria' which will be used in Multinational Vendor Inspection. The 'Common QA/QM Criteria' provides the basic consideration when performing the Vendor Inspection. These criteria has been developed in conformity with International Codes and Standards such as IAEA, ISO and so on that MDEP member countries adopted. The purpose of the VICWG is to establish areas of co-operation in the Vendor Inspection practices among MDEP member countries as described in the MDEP issue-specific Terms of Reference (ToR). As part of this, from the beginning, a survey was performed to understand and to identify areas of commonality and differences between regulatory practices of member countries in the area of vendor inspection. The VICWG also collaborated by performing Witnessed Inspections and Joint Inspections. Through these activities, it was recognized that member countries commonly apply the IAEA safety standard (GS-R-3) to the vendor inspection criteria, and almost ail European member countries apply the ISO standard (ISO9001). In the US, the NRC regulatory requirement in 10 CFR, Part 50, Appendix B is used. South Korea uses the same criteria as in the US. As a result of the information obtained, a comparison table between codes and standards (IAEAGS-R-3, ISO 9001:2008.10CFR50 Appendix Band ASME NQA-1) has been developed in order to inform the development of 'Common QA/QM Criteria'. The result is documented in Table 1, 'MDEP CORE QA/QM Requirement and Comparison between Codes and Standards'. In addition, each country's criteria were compared with the US 10CFR50 Appendix B as a template. Table 2 shows VICWG Survey on Quality Assurance Program Requirements. Through these activities above, we considered that the core requirements should be consistent with both IAEA safety standard and ISO standard, and considered that the common requirements in the US 10CFR50 Appendix B used to the survey

  17. Remote inspection of steam turbine blades

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    During the past five years Reinhart and Associates, Inc. has been involved in remote examination of L-0 and L-1 steam turbine blade rows of in-place LP turbines using visual and eddy current techniques. These tests have concentrated on the trailing edge and blade-to-rotor attachment (Christmas tree) areas. These remote nondestructive examinations were performed through hand access ports of the inner shell. Since the remote scanning system was in a prototype configuration, the inspection was highly operator-dependent. Refinement of the scanning equipment would considerably improve the efficiency of the test; however, the feasibility of remote in-place inspection of turbine blades was established. To further improve this technology, and to provide for remote inspection of other areas of the blade and additional turbine designs, EPRI is funding a one-year project with Reinhart and Associates, Inc. This project will develop a new system that employs state-of-the-art multifrequency eddy current techniques, a miniature charged coupled device (CCD) television camera, and remote positioning equipment. Project results from the first six months are presented

  18. Usage Inspection of KN-12 Spent Fuel Transport Cask

    International Nuclear Information System (INIS)

    Lee, J. C.; Seo, K. S.; Bang, K. S.; Cho, I. J.; Kim, D. H.; Min, D. K.

    2007-03-01

    The usage inspection of the KN-12 spent nuclear fuel transport package was performed to receive the license for reuse. According to the Korea Atomic Energy Act, all type B transport package should receive and pass the usage inspection every five years. The KN-12 transport cask was designed to transport twelve spent PWR fuel assemblies under wet and dry conditions. The cask was developed and licensed in 2002 in accordance with the Korea and the IAEA's safe transport regulations. The areas of usage inspection include: visual inspection, nondestructive weld inspection, load test, maximum operating pressure test, leakage test, shielding test, thermal test, external surface contamination test. In the results of the usage inspection, the damage or defect could not found out and the performance of the cask was maintained according to the requirements of the regulation. Therefore, the usage inspection was successfully performed to acquire the license for the reuse

  19. MINAC, A new radiographic inspection capability

    International Nuclear Information System (INIS)

    Lapides, M.E.; Schonberg, R.

    1983-01-01

    In service, radiographic inspection of thick section, metallic components has historically been limited to the capabilities of radioisotopic sources such as cobalt and iridium. Although practical in many applications, these sources tend to be restricted by output intensity, by resolution obtainable, and by the physical size and weight of necessary transport shielding. In nuclear plant applications, any radiography is also frequently inhibited by the presence of a radiation background from activated corrosion products on the inspection object which may fog the film before the desired exposure is achieved. In recognition of these limitations and the need for improved capability in the conduct of mandated ten-year inspection of U.S. nuclear plant components such as reactor coolant pumps, pressure vessel nozzles and valve bodies, the Electric Power Research Institute (EPRI) undertook the development of a high energy, X-ray device appropriate for in service inspection of thick section (up to approximately 30 cm of steel) components. The development was conducted by Schonberg Radiation (U.S.A). The product, MINAC, a miniaturized linear accelerator system, has been in use in many plant inspections since April 1981. This paper describes the development and typical applications of MINAC

  20. Follow up of test areas with FSS liners. Gaerstad and Sofielund landfills; Uppfoeljning av provytor med taetskikt av FSA. Gaerstad deponi och Sofielunds deponi

    Energy Technology Data Exchange (ETDEWEB)

    Laendell, Maerta; Carling, Maria; Haakansson, Karsten; Myrhede, Elke; Svensson, Bo

    2009-03-19

    carbon dioxide in the pore gas. It was not possible to quantify the magnitude of the decomposition, although results of measurements of organic content in the material suggest that decomposition is limited. Effects of decomposition on the function of the liner have not been observed. The runoff water from the liner surface contains high concentrations of metals, nutrients and organic carbon compared to the Swedish EPA's threshold values for surface water. This water corresponds to that which will eventually reach a watercourse, lake, etc, possibly after treatment. The concentrations have decreased during the follow-up period. In summary, the liner composed of the FSS mixture is judged to function well as regards permeability and durability. The investigated test areas are only 3-4 years old, and further follow-up studies of permeability, durability, and properties of the runoff water should provide valuable information. Concentrations in the runoff water have not stabilized. It would be of particular interest to investigate if the permeability can meet the requirements for hazardous waste landfills and to verify the trend towards lower concentrations in the runoff water

  1. Increasing Follow-up Outcomes of At-Risk Alcohol Patients Using Motivational Interviewing.

    Science.gov (United States)

    Wagner, Andrew J; Garbers, Rachael; Lang, Ann; Borgert, Andrew J; Fisher, Mason

    2016-01-01

    Our trauma division implemented a screening, brief intervention, and referral to treatment (SBIRT) program in 2009 and has maintained more than 92% screening rate for all inpatient admissions since inception. Brief interventions are proven to be more likely to effect and reinforce change if a follow-up contact is made with patients. This led to discussion regarding whether identified patients were more likely to follow up with our SBIRT wellness specialist using motivational interviewing or with our partners, exercise physiology, who use traditional interviewing techniques. We retrospectively reviewed more than 3,000 inpatient admissions in which screening for at-risk alcohol use were positive. Fifty-one percent of identified patients were referred for wellness specialist consultation with a follow-up rate of 52% compared with a follow-up rate of only 21% in the exercise physiology group. Motivational interviewing is more effective in encouraging at-risk alcohol users to participate in follow-up care.

  2. Recurrent inspection of tubes

    International Nuclear Information System (INIS)

    Andersson, S.

    1984-01-01

    Recommendations concerning the selection of areas for the inspection of tubes have been outlined. The aim is to focus the control on the regions which are important for the safety and where damage is supposed to take place. The number of zones will depend on the risk factors as judged by experts. The localizing will be based upon probable damaging mechanisms. A certain number of areas should be chosen at random. (G.B.)

  3. Follow-up of pulmonary perfusion recovery after embolism

    International Nuclear Information System (INIS)

    Palla, A.; Donnamaria, V.; Petruzzelli, S.; Giuntini, C.

    1986-01-01

    Blood flow recovery in a group of 69 patients with pulmonary embolism was followed by serial lung scans over a six month period. Each patient underwent perfusion lung scan at diagnosis then 7, 30 and 180 days later; i.v. heparin was systematically administered for one week after diagnosis, followed by oral warfarin for six months. Blood flow impairment was evaluated by assessing the total number of unperfused lung segments (ULS), as calculated on both lateral views at each scan. The number of ULS was significantly reduced at each interval (P<0.001), ranging from 8.4±3.3 at diagnosis to 3.6±2.7 six months later; most of the recovery (79%) occurred within the first month. No patient had complete restoration of pulmonary blood flow during the whole follow-up period. No difference was found between the number of ULS in right lung versus that in left lung at each interval. Recovery of blood flow was heavily affected by coexisting cardiac or pulmonary disease. In fact, those patients with underlying cardiopulmonary disease (49.2% of the total) showed significantly smaller perfusion improvement after six months (P<0.001). Eight patients (6 with and 2 without cardiopulmonary disease) had clinical and scintigraphic evidence of recurrent embolism during the follow-up period

  4. Factors associated with intentions to adhere to colorectal cancer screening follow-up exams

    Directory of Open Access Journals (Sweden)

    Ishibashi Teruo

    2006-11-01

    Full Text Available Abstract Background To increase adherence rate to recommendations for follow-up after abnormal colorectal cancer (CRC screening results, factors that inhibit and facilitate follow-up must be identified. The purpose of this study was to identify the factors associated with intention to adhere to CRC screening follow-up exams. Methods During a 4-week period in October 2003, this survey was conducted with 426 subjects participating in a community-based CRC screening program in Nagano, Japan. Study measures included intention to adhere to recommendation for clinical follow-up in the event of an abnormal fecal occult blood test (FOBT result, perceived susceptibility and severity of CRC, perceived benefits and barriers related to undergoing follow-up examination, social support, knowledge of CRC risk factors, health status, previous CRC screening, personality and social demographic characteristics. Univariate and multivariate logistic regression analyses on intention to adhere to recommendations for follow-up were performed. Results Among the 288 individuals analyzed, approximately 74.7% indicated that they would definitely adhere to recommendations for follow-up. After controlling for age, gender, marital status, education, economic status, trait anxiety, bowel symptoms, family history of CRC, and previous screening FOBT, analyses revealed that lower levels of perceived barriers, higher levers of perceived benefits and knowledge of CRC risk factors were significantly associated with high intention respectively. Conclusion The results of this study suggest that future interventions should focus on reducing modifiable barriers by clarifying misperceptions about follow-up, promoting the acceptance of complete diagnostic evaluations, addressing psychological distress, and making follow-up testing more convenient and accessible. Moreover, educating the public regarding the risk factors of CRC and increasing understanding of the benefits of follow-up is

  5. 46 CFR 153.30 - Special area endorsement.

    Science.gov (United States)

    2010-10-01

    ... endorsement. The Coast Guard endorses the Certificate of Inspection of a United States ship allowing it to operate in special areas if the ship owner— (a) Requests the endorsement following the procedures in § 153... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CERTAIN BULK DANGEROUS CARGOES SHIPS CARRYING...

  6. Inspection of aging aircraft: A manufacturer's perspective

    Science.gov (United States)

    Hagemaier, Donald J.

    1992-01-01

    Douglas, in conjunction with operators and regulators, has established interrelated programs to identify and address issues regarding inspection of aging aircraft. These inspection programs consist of the following: Supplemental Inspection Documents; Corrosion Prevention and Control Documents; Repair Assessment Documents; and Service Bulletin Compliance Documents. In addition, airframe manufacturers perform extended airframe fatigue tests to deal with potential problems before they can develop in the fleet. Lastly, nondestructive inspection (NDI) plays a role in all these programs through the detection of cracks, corrosion, and disbonds. However, improved and more cost effective NDI methods are needed. Some methods such as magneto-optic imaging, electronic shearography, Diffractor-Sight, and multi-parameter eddy current testing appear viable for near-term improvements in NDI of aging aircraft.

  7. Follow-up of CRNL employees involved in the NRX reactor clean-up

    International Nuclear Information System (INIS)

    Werner, M.M.; Myers, D.K.; Morrison, D.P.

    1982-07-01

    Data available to date on the mortality of continuing and retired employees of the Chalk River Nuclear Laboratories are consistent with the Σhealthy workerΣ effect that has been observed in similar studies at other nuclear facilities. Because of an accident at the NRX research reactor in December 1952, the reactor was largely dismantled and rebuilt in 1953-54. These operations involved appreciable radiation exposures to a number of employees. The follow-up of the 850 on-site AECL staff involved in the clean-up has indicated that there were no unusual patterns in the mortality of this group when compared with those of the general population of Ontario

  8. Comfort monitoring? Environmental assessment follow-up under community-industry negotiated environmental agreements

    International Nuclear Information System (INIS)

    Noble, Bram; Birk, Jasmine

    2011-01-01

    Negotiated environmental agreements are becoming common practice in the mining industry. In principle, negotiated environmental agreements are said to respond to many of the shortcomings of environmental impact assessment by providing for improved follow-up of project impacts through, among other things, data provision, engaging stakeholders in the monitoring and management of project impacts, and building capacity at the local level to deal with project-induced environmental change. In practice, however, little is known about the efficacy of follow-up under negotiated environmental agreements between proponents and communities and the demonstrated value added to project impact management. This paper examines follow-up practice under negotiated environmental agreements with a view to understanding whether and how community-based monitoring under privatized agreements actually contributes to improved follow-up and impact management. Based on lessons emerging from recent experiences with environmental agreements in Canada's uranium industry, we show that follow-up under negotiated agreements may be described as 'comfort monitoring'. While such monitoring does improve community-industry relations and enhance corporate image, it does little to support effects-based management. If follow-up under negotiated agreements is to be credible over the long term, there is a need to ensure that monitoring results are useful for, and integrated with, regulatory-based monitoring and project impact management practices.

  9. Critical Care Follow-up Clinics: A Scoping Review of Interventions and Outcomes.

    Science.gov (United States)

    Lasiter, Sue; Oles, Sylwia K; Mundell, James; London, Susan; Khan, Babar

    2016-01-01

    The purpose of this scoping review is to identify evidence describing benefits of interventions provided in intensive care unit (ICU) survivor follow-up clinics. Advances in ICU treatments have increased the number of survivors who require specialized care for ICU-related sequelae. Intensive care unit survivor follow-up clinics exist, yet little is known about the nature and impact of interventions provided in such clinics. A scoping review of publications about in-person post-ICU follow-up care was undertaken. Ten databases were searched yielding 111 relevant unique publication titles and abstracts. Sample heterogeneity supported using a scoping review method. After excluding nonrelated publications, 33 reports were fully reviewed. Twenty international publications were included that described ICU follow-up clinic interventions and/or outcomes. Authors discussed very diverse interventions in 15 publications, and 9 reported some level of intervention effectiveness. Evidence was strongest that supported the use of prospective diaries as an intervention to prevent or improve psychological symptoms, whereas evidence to support implementation of other interventions was weak. Although ICU follow-up clinics exist, evidence for interventions and effectiveness of treatments in these clinics remains underexplored. Intensive care unit survivor follow-up clinics provide a venue for further interdisciplinary intervention research that could lead to better health outcomes for ICU survivors.

  10. Pediatric Systemic Lupus Erythematosus: Learning From Longer Follow Up to Adulthood

    Directory of Open Access Journals (Sweden)

    Giorgio Costagliola

    2018-05-01

    Full Text Available Background: Pediatric systemic lupus erythematosus (pSLE is a rare condition, representing approximately 10% of SLE cases. The aim of this study was to identify variables to improve the diagnostic awareness and management of pSLE patients.Methods: This retrospective study included 25 patients diagnosed with pSLE and followed at the University of Pisa. We collected data about clinical profile at disease onset and during a long-term follow-up, including disease activity, organ damage development, and treatments received.Results: The mean patient age at disease onset was 14.6 ± 1.6 years, and the mean follow-up period was 14.17 ± 8.04 years. The most common initial manifestations were arthritis, malar rash, and cytopenias. The median time to diagnosis since the first symptoms was 6 months, and was significantly longer in patients with hematological onset (54 months. During follow-up, the number of patients with renal involvement showed a significant increase, from 36% at diagnosis to 72.2% after 10 years of disease evolution. Patients who developed chronic organ damage maintained a higher time-averaged disease activity during follow-up and received a significantly higher dose of corticosteroids.Conclusion: Patients with immune cytopenia represent a group deserving strict clinical follow-up for the risk of evolution to SLE. Intense surveillance of renal function, early treatment and steroid-sparing strategies should be strongly considered in the management of pSLE patients.

  11. Ultrasonic inspection development at HEDL

    International Nuclear Information System (INIS)

    Day, C.K.; Mech, S.J.; Michaels, T.E.; Dixon, N.E.

    1978-01-01

    Ultrasonic testing methods and equipment are being developed to support preservice and in-service inspection of selected FFTF welds. A digital computer system is employed in the analysis of both simulated FFTF pipe sections and plate specimens containing fatigue cracks. It is anticipated that test evaluation standards containing fatigue cracks will partially eliminate questions formerly associated with weld test calibration producers by providing natural cracks which follow grain boundaries and stress patterns resembling piping situ conditions. Studies have revealed that commercial transducers may satisfy LMFBR ultrasonic pipe inspection applications: The test system evaluation included transducers and wedge coupling and fluid coupling materials which exhibited acceptable performance at temperatures to 2300C. Results are presented that demonstrate the feasibility of ultrasonic inspection of components immersed in sodium at temperatures to 2600C. (UK)

  12. 33 CFR 164.80 - Tests, inspections, and voyage planning.

    Science.gov (United States)

    2010-07-01

    ... searchlights. (5) Terminal gear. Visual inspection of tackle; of connections of bridle and towing pendant, if.... (2) Terminal gear. Visual inspection of tackle; of connections of bridle and towing pendant, if... under-keel and vertical clearances (air-gaps) for all bridges, ports, and berthing areas; (v) Pre...

  13. Holography for fast reactor inspection

    International Nuclear Information System (INIS)

    Tozer, B.A.

    1980-01-01

    Holography, an optical process whereby an image of the original subject can be reconstructed in three dimensions, is being developed for use as an optical inspection tool. With a potential information storage density of 10 16 bits/m 2 , the ability to reconstruct in 3 dimensions, a depth of field of up to 8 metres, extremely wide angle of view, and potentially diffraction limited resolution, holography should be invaluable for the optical recording of fast reactors during construction, and the inspection of optically accessible regions during operation, or maintenance down-times. The photographic emulsions used for high resolution holography are fine-grained and fog only very slowly when subjected to γ-radiation, so that inspection of highly radio-active regions and components can be effected satisfactorily. Some of the practical limitations affecting holography are described and ways of overcoming them discussed. Some preliminary results are presented. (author)

  14. Poolside inspection, repair and reconstitution of LWR fuel elements

    International Nuclear Information System (INIS)

    1993-03-01

    The purpose of the meeting was to review the state of the art in the area of poolside inspection, repair and reconstitution of light water fuel elements. In the present publication it appears that techniques of inspection, repair and reconstitution of fuel elements have been developed by fuel suppliers and are now routinely and successfully applied in many countries. For the first time, the subject of control rod poolside examination was dealt with, poolside inspection and repair of a MOX assembly were reported and the inspection and repair of WWER assemblies were examined. Compared to the results of the previous meeting, present developments in the area aim now at reaching better economics, better reliability, reduction of personal doses and waste volume. Thirty-six participants representing twelve countries attended the meeting. Fifteen papers were presented in two sessions. An abstract was prepared for each of these papers. Refs, figs, tabs, diagrams, pictures and photos

  15. The role of the follow-up chest radiograph in suspected non-accidental injury

    Energy Technology Data Exchange (ETDEWEB)

    Anilkumar, Adikesavalu; Fender, Laura J; Broderick, Nigel J; Somers, John M; Halliday, Katharine E [Nottingham University Hospital NHS Trust, Department of Radiology, Queen' s Medical Centre, Nottingham (United Kingdom)

    2006-03-15

    Rib fractures in children under the age of 2 years have a strong correlation with non-accidental injury (NAI). Follow-up radiographs can improve detection. To evaluate the value of the follow-up chest radiograph in suspected non-accidental injury. The study included all children less than 2 years of age who were investigated for suspected NAI in our institution between January 1998 and October 2003. Prior to January 2000, only selected patients were asked to attend for a follow-up chest radiograph. From January 2000 onwards all children were asked to reattend. Of 200 children included in the study, 59 (29.5%) reattended for a follow-up chest radiograph. The follow-up film provided useful additional information in 7 (12%) of the 59 children. In two children rib fractures were noted only on the follow-up chest radiograph. In a further two patients additional rib fractures were noted. Additional dating information was obtained for two patients. For one child both additional fractures and dating information were noted. The follow-up chest radiograph provides useful information in children with suspected NAI and it is recommended that it should be included routinely in the imaging investigations of these children. (orig.)

  16. The role of the follow-up chest radiograph in suspected non-accidental injury

    International Nuclear Information System (INIS)

    Anilkumar, Adikesavalu; Fender, Laura J.; Broderick, Nigel J.; Somers, John M.; Halliday, Katharine E.

    2006-01-01

    Rib fractures in children under the age of 2 years have a strong correlation with non-accidental injury (NAI). Follow-up radiographs can improve detection. To evaluate the value of the follow-up chest radiograph in suspected non-accidental injury. The study included all children less than 2 years of age who were investigated for suspected NAI in our institution between January 1998 and October 2003. Prior to January 2000, only selected patients were asked to attend for a follow-up chest radiograph. From January 2000 onwards all children were asked to reattend. Of 200 children included in the study, 59 (29.5%) reattended for a follow-up chest radiograph. The follow-up film provided useful additional information in 7 (12%) of the 59 children. In two children rib fractures were noted only on the follow-up chest radiograph. In a further two patients additional rib fractures were noted. Additional dating information was obtained for two patients. For one child both additional fractures and dating information were noted. The follow-up chest radiograph provides useful information in children with suspected NAI and it is recommended that it should be included routinely in the imaging investigations of these children. (orig.)

  17. 10-year follow-up of calcifying odontogenic cyst in the periapical region of vital maxillary central incisor.

    Science.gov (United States)

    de Carvalhosa, Artur Aburad; de Araújo Estrela, Cyntia Rodrigues; Borges, Alvaro Henrique; Guedes, Orlando Aguirre; Estrela, Carlos

    2014-10-01

    Radiographic images may lead to misinterpretations of lesions of endodontic and nonendodontic origin. This report describes a case of a 10-year follow-up of a calcifying odontogenic cyst (COC) in the periapical region of a vital maxillary central incisor in a 9-year-old boy. The patient revealed a history of a swelling in the periapical area of tooth #9. The patient denied any dental trauma or history of pain. Clinical examination revealed no mobility, but there was discrete discomfort when horizontal pressure was applied. Pulp vitality was present in all maxillary anterior teeth. Radiographs revealed an oval radiolucent lesion in the periapical region of maxillary central incisor. The therapeutic option was enucleation of the periapical lesion and histologic examination of the specimen. Microscopic findings suggested the diagnosis of a COC. At a follow-up visit 10 years after surgery, panoramic and periapical radiographs showed new bone formation; the patient did not have any pain, and pulp vitality was maintained in all teeth in this area. A COC should be part of the differential diagnosis of other jaw lesions, such as apical periodontitis. The definitive diagnosis of a COC can only be made after microscopic evaluation of the specimen. The follow-up is a helpful reference because it confirms the survival of pulp tissue and no recurrence of the COC. Copyright © 2014 American Association of Endodontists. Published by Elsevier Inc. All rights reserved.

  18. Genealogical databases as a tool for extending follow-up in clinical reviews.

    Science.gov (United States)

    Ho, Thuy-Van; Chowdhury, Naweed; Kandl, Christopher; Hoover, Cindy; Robinson, Ann; Hoover, Larry

    2016-08-01

    Long-term follow-up in clinical reviews often presents significant difficulty with conventional medical records alone. Publicly accessible genealogical databases such as Ancestry.com provide another avenue for obtaining extended follow-up and added outcome information. No previous studies have described the use of genealogical databases in the follow-up of individual patients. Ancestry.com, the largest genealogical database in the United States, houses extensive demographic data on an increasing number of Americans. In a recent retrospective review of esthesioneuroblastoma patients treated at our institution, we used this resource to ascertain the outcomes of patients otherwise lost to follow-up. Additional information such as quality of life and supplemental treatments the patient may have received at home was obtained through direct contact with living relatives. The use of Ancestry.com resulted in a 25% increase (20 months) in follow-up duration as well as incorporation of an additional 7 patients in our study (18%) who would otherwise not have had adequate hospital chart data for inclusion. Many patients within this subset had more advanced disease or were remotely located from our institution. As such, exclusion of these outliers can impact the quality of subsequent outcome analysis. Online genealogical databases provide a unique resource of public information that is acceptable to institutional review boards for patient follow-up in clinical reviews. Utilization of Ancestry.com data led to significant improvement in follow-up duration and increased the number of patients with sufficient data that could be included in our retrospective study. © 2016 ARS-AAOA, LLC.

  19. Light transmission and air used for inspection of glovebox gloves

    International Nuclear Information System (INIS)

    Castro, Julio M.; Steckle, Warren P. Jr.; Macdonald, John M.

    2002-01-01

    Various materials used for manufacturing the glovebox gloves are translucent material such as hypalon, rubbers, and neoprene. This means that visible light can be transmitted through the inside of the material. Performing this test can help to increase visualization of the integrity of the glove. Certain flaws such as pockmarks, foreign material, pinholes, and scratches could be detected with increased accuracy. An analysis was conducted of the glovebox gloves obscure polymer material using a inspection light table. The fixture is equipped with a central light supply and small air pump to inflate the glove and test for leak and stability. A glove is affixed to the fixture for 360-degree inspection. Certain inspection processes can be performed: (1) Inspection for pockmarks and thin areas within the gloves; (2) Observation of foreign material within the polymer matrix; and (3) Measurements could be taken for gloves thickness using light measurements. This process could help reduce eyestrain when examining gloves and making a judgment call on the size of material thickness in some critical areas. Critical areas are fingertips and crotch of fingers.

  20. [Follow-up of newborns with hypoxic-ischaemic encephalopathy].

    Science.gov (United States)

    Martínez-Biarge, M; Blanco, D; García-Alix, A; Salas, S

    2014-07-01

    Hypothermia treatment for newborn infants with hypoxic-ischemic encephalopathy reduces the number of neonates who die or have permanent neurological deficits. Although this therapy is now standard of care, neonatal hypoxic-ischaemic encephalopathy still has a significant impact on the child's neurodevelopment and quality of life. Infants with hypoxic-ischaemic encephalopathy should be enrolled in multidisciplinary follow-up programs in order to detect impairments, to initiate early intervention, and to provide counselling and support for families. This article describes the main neurodevelopmental outcomes after term neonatal hypoxic-ischaemic encephalopathy. We offer recommendations for follow-up based on the infant's clinical condition and other prognostic indicators, mainly neonatal neuroimaging. Other aspects, such as palliative care and medico-legal issues, are also briefly discussed. Copyright © 2013 Asociación Española de Pediatría. Published by Elsevier Espana. All rights reserved.

  1. Radiosurgery of craniopharyngiomas. Results of long-term follow-up

    International Nuclear Information System (INIS)

    Kida, Yoshihisa; Hasegawa, Toshinori; Yoshimoto, Masayuki; Koike, Johzi; Kobayashi, Tatsuya

    2007-01-01

    Long-term follow-up results of craniopharyngiomas after radiosurgery are reported. Among 125 cases of craniopharyngioma, long-term follow-up more than 6 months is obtained in 108 cases. Majority of the cases have had surgical excision before radiosurgery. The tumors, 19 mm in mean diameter were treated with the mean maximum dose of 22.1 Gy and with the marginal dose of 11.6 Gy. The final radiological outcomes during 63 months of mean follow-up showed 9 complete responses (CRs), 61 partial responses (PRs), 1 minor response (MR), 19 no changes (NCs) and 18 PGs, indicating the response rate of 65% and the control rate of 83% respectively. Neurological and endocrinological signs were improved in 18%, unchanged in 53% and worsened in 15% of cases, meanwhile 8% of the patients were dead. Small and solid tumors were the best indication for radiosurgery due to excellent tumor control as well as no adverse effects. They may have a good chance for complete remission. In conclusion a sufficient tumor resection with microsurgery is required and subsequent radiosurgery is most adequate for treating craniopharyngiomas. (author)

  2. Comparison radiographic and automated ultrasonic inspection of pipeline tie-in welds

    International Nuclear Information System (INIS)

    Connelly, T.; Gross, B.

    2007-01-01

    In recent years the use of automated ultrasonic inspection (AUT) for pipeline girth welds has seen rapid growth and is now used almost exclusively for all gas metal arc welding (GMAW) girth weld inspection. The following paper reviews some of the major features of ultrasonic inspection by comparison to conventional Film Radiography (RT) and reviews the use of ultrasonic inspection for pipeline and tie-in welds. (author)

  3. Intensive follow-up for women with breast cancer: review of clinical, economic and patient's preference domains through evidence to decision framework.

    Science.gov (United States)

    Lafranconi, Alessandra; Pylkkänen, Liisa; Deandrea, Silvia; Bramesfeld, Anke; Lerda, Donata; Neamțiu, Luciana; Saz-Parkinson, Zuleika; Posso, Margarita; Rigau, David; Sola, Ivan; Alonso-Coello, Pablo; Martinez-Zapata, Maria José

    2017-10-19

    ). Furthermore, intensive follow-up, as opposed to less intensive follow-up, is not likely to be cost-effective. Less intensive follow-up appears to be justified and can be recommended over intensive follow-up. Resources could thus be mobilised to other aspects of breast cancer care, or other areas of healthcare.

  4. Inspection device in liquid

    International Nuclear Information System (INIS)

    Nagaoka, Etsuo.

    1996-01-01

    The present invention provides an inspection device in PWR reactor core in which inspection operations are made efficient by stabilizing a posture of the device in front-to-back, vertical and left-to-right directions by a simple structure. When the device conducts inspection while running in liquid, the front and the back directions of the device main body are inspected using a visual device while changing the posture by operating a front-to-back direction propulsion device and a right-to-left direction propulsion device, and a vertical direction propulsion device against to rolling, pitching and yawing of the device main body. In this case, a spherical magnet moves freely in the gravitational direction in a vibration-damping fluid in a non-magnetic spherical shell following the change of the posture of the device main body, in which the vibrations due to the movement of the spherical magnet is settled by the vibration-damping fluid thereby stabilizing the posture of the device main body. At a typical inspection posture, the settling effect is enhanced by the attraction force between the spherical magnets in the spherical shell and each of magnetic force-attracted magnetic members disposed to the outer circumference of the shell, and the posture of the device main body can be confirmed in front-to-back, right-to-left and vertical directions by each of the posture confirming magnetic sensors. (N.H.)

  5. Usage Inspection of KN-12 Spent Fuel Transport Cask

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J. C.; Seo, K. S.; Bang, K. S.; Cho, I. J.; Kim, D. H.; Min, D. K

    2007-03-15

    The usage inspection of the KN-12 spent nuclear fuel transport package was performed to receive the license for reuse. According to the Korea Atomic Energy Act, all type B transport package should receive and pass the usage inspection every five years. The KN-12 transport cask was designed to transport twelve spent PWR fuel assemblies under wet and dry conditions. The cask was developed and licensed in 2002 in accordance with the Korea and the IAEA's safe transport regulations. The areas of usage inspection include: visual inspection, nondestructive weld inspection, load test, maximum operating pressure test, leakage test, shielding test, thermal test, external surface contamination test. In the results of the usage inspection, the damage or defect could not found out and the performance of the cask was maintained according to the requirements of the regulation. Therefore, the usage inspection was successfully performed to acquire the license for the reuse.

  6. Follow-up of young road accident victims.

    Science.gov (United States)

    Gillies, Marjorie L; Barton, Joanne; Di Gallo, Alain

    2003-10-01

    The aim of this study was to follow-up a group of children and young people previously examined for psychological sequelae following road traffic accidents. The group was assessed 18-month postaccident to assess the severity of continuing symptoms and examine any emergence of delayed onset of posttraumatic stress reactions. Participants (N = 31) completed the Revised Impact of Event Scale and the Child Posttraumatic Stress Reaction Index. Parents completed the Child Behavior Check-List and participated in a semistructured interview. Symptoms of PTSD were noted in a quarter of participants as was delayed onset of symptoms. The role of avoidance in symptom reporting and continuing disorder is discussed.

  7. CYSTINURIA - A TEN-YEAR FOLLOW-UP OF THE PATIENTS

    Directory of Open Access Journals (Sweden)

    Anđelka Slavković

    2001-09-01

    Full Text Available In the period from 1991 to 2001 there were four patients followed up who suffered from cystinuria and cystine calcinosis. The therapy consisting of the cystine dilution in the urine by a great taking-in of liquids and the urine alkalization was combined with alphamercaptopropione glycine and captoprile that bind cystine as well as a respective diet. Alphamercaptopropione glycine leads to the reduction of the already-formed calculus and their easier treatment in the case of a possible need for extracorporeal lithotripsy (ESWEL. During the ten-year follow-up of a small series of patients there were no complications related to the medicament treatment.

  8. FY 1999 research cooperation project - the research cooperation on the protection of biodiversity and sustainable use, etc. Follow-up; 1999 nendo seibutsu tayosei hozen to jizokuteki riyo nado ni kansuru kenkyu kyoryoku. Follow up

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The follow-up for the research cooperation for Indonesia, Malaysia and Thailand was conducted to make it possible that developing countries themselves protect biological resources in the tropical area, etc. and make the sustainable use of biological resources using bio-technology. In Indonesia, the follow-up was to be made for proceeding with the joint study for 'The study on the plant utilization technology - search for useful plant ingredients' reported by Professor Koshimizu, Kinki University. In Malaysia, considering that equipment is enough installed there and research leaders are very excellent, it is considered that the country is suitable for the partner of future joint research on microorganisms with Japan. Moreover, the merit in joint study is the cooperation in study of information system and culture collection. In Thailand, Japan told them that the study theme has to be made smaller toward the culture collection rich in content and the search for useful plants/bacteria. (NEDO)

  9. FY 1999 research cooperation project - the research cooperation on the protection of biodiversity and sustainable use, etc. Follow-up; 1999 nendo seibutsu tayosei hozen to jizokuteki riyo nado ni kansuru kenkyu kyoryoku. Follow up

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    The follow-up for the research cooperation for Indonesia, Malaysia and Thailand was conducted to make it possible that developing countries themselves protect biological resources in the tropical area, etc. and make the sustainable use of biological resources using bio-technology. In Indonesia, the follow-up was to be made for proceeding with the joint study for 'The study on the plant utilization technology - search for useful plant ingredients' reported by Professor Koshimizu, Kinki University. In Malaysia, considering that equipment is enough installed there and research leaders are very excellent, it is considered that the country is suitable for the partner of future joint research on microorganisms with Japan. Moreover, the merit in joint study is the cooperation in study of information system and culture collection. In Thailand, Japan told them that the study theme has to be made smaller toward the culture collection rich in content and the search for useful plants/bacteria. (NEDO)

  10. Determining prestressing forces for inspection of prestressed concrete containments

    International Nuclear Information System (INIS)

    1990-07-01

    General Design Criterion 53, ''Provisions for Containment Testing and Inspection,'' of Appendix A, ''General Design Criteria for Nuclear Power Plants,'' to 10 CFR Part 50, ''Domestic Licensing of Production and Utilization Facilities,'' requires, in part, that the reactor containment be designed to permit (1) periodic inspection of all important areas and (2) an appropriate surveillance program. Regulatory Guide 1.35, ''Inservice Inspection of Ungrouted Tendons in Prestressed Concrete Containment Structures,'' describes a basis acceptable to the NRC staff for developing an appropriate inservice inspection and surveillance program for ungrouted tendons in prestressed concrete containment structures of light-water-cooled reactors. This guide expands and clarifies the NRC staff position on determining prestressing forces to be used for inservice inspections of prestressed concrete containment structures

  11. Long-term adherence to follow-up after treatment of cervical intraepithelial neoplasia

    DEFF Research Database (Denmark)

    Barken, Sidsel S; Lynge, Elsebeth; Andersen, Erik S.

    2013-01-01

    OBJECTIVE: To measure adherence to annual follow-up among women treated for cervical intraepithelial neoplasia. DESIGN: Prospective, population-based, register study. SETTING: Denmark, 1996-2007. POPULATION: All women treated for cervical intraepithelial neoplasia with conization. METHODS: Treated...... was poor in Denmark. Our findings suggest that because of this poor adherence, recommendations for long-term annual follow-up after treatment of cervical intraepithelial neoplasia may not be highly effective. Shorter follow-up schedules using highly sensitive tests appear attractive....

  12. Inspection of austenitic welds with ultrasonic phased array technology

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, A.; Fernandez, F. [Tecnatom (Spain); Dutruc, R.; Ferriere, R. [Metalscan (France)

    2011-07-01

    This series of slides presents the use of ultrasonic phased array technology in the inspection of austenitic welds. The inspection from outside surface (the inspection is performed in contact using wedges to couple the probe to the outer surface of the component) shows that longitudinal wave is the most adequate for perpendicular scans and transversal ultrasonic wave is the most adequate for parallel scans. Detection and length sizing are performed optimally in perpendicular scans. The inspection from inside surface shows: -) Good results in the detection of defects (Sizing has met the requirements imposed by the Authority of the Russian Federation); -) The new design of the mechanical equipment and of the numerous ultrasonic beams refracted by the array probes has increased the volume inspected. The design of the mechanical equipment has also allowed new areas to be inspected (example a piping weld that was not accessible from the outer surface; -) The ultrasonic procedure and Inspection System developed have been validated by the Authority of the Russian Federation. Phase array technique supplies solutions to solve accessibility concerns and improve the ultrasonic inspections of nuclear components

  13. Evaluation of the feasibility for detecting hidden corrosion damage in multi-layer gusset plates using multiple inspection techniques

    International Nuclear Information System (INIS)

    Cobb, Adam C.; Duffer, Charles E.; Light, Glenn M.

    2014-01-01

    Gusset plates are used to connect the members in truss bridges and they are usually inspected using calipers or conventional thickness measurement ultrasonic testing (UT) devices. The damage mechanism of particular concern in gusset plates is corrosion and the regions most susceptible to corrosion damage are on the gusset interior surface where it intersects the chord, diagonal, and vertical members from water collecting at the interfaces. For heavily loaded gusset plates, one or more shingle plates are used to reinforce the gusset plate, creating a multi-layer structure. While the areas with corrosion damage remain near the members on the gusset plate, the shingle plates cover the gusset plate and greatly limit the surface access to the gusset plate, making UT thickness measurement impractical. Because of the critical nature of the gussets, a viable inspection strategy for multi-layer gusset assemblies must be developed. The premise of this research and development effort was to develop viable, field-deployable inspection approaches for this problem area. This paper presents three separate inspection approaches: two ultrasonic-based techniques and one radiographic approach. Each of these techniques was evaluated on a mock-up specimen provided by the Federal Highway Administration (FHWA) that is representative of gusseted connection from a truss bridge

  14. Evaluation of the feasibility for detecting hidden corrosion damage in multi-layer gusset plates using multiple inspection techniques

    Energy Technology Data Exchange (ETDEWEB)

    Cobb, Adam C.; Duffer, Charles E.; Light, Glenn M. [Southwest Research Institute, 6220 Culebra Road, San Antonio, TX 78238-5166 (United States)

    2014-02-18

    Gusset plates are used to connect the members in truss bridges and they are usually inspected using calipers or conventional thickness measurement ultrasonic testing (UT) devices. The damage mechanism of particular concern in gusset plates is corrosion and the regions most susceptible to corrosion damage are on the gusset interior surface where it intersects the chord, diagonal, and vertical members from water collecting at the interfaces. For heavily loaded gusset plates, one or more shingle plates are used to reinforce the gusset plate, creating a multi-layer structure. While the areas with corrosion damage remain near the members on the gusset plate, the shingle plates cover the gusset plate and greatly limit the surface access to the gusset plate, making UT thickness measurement impractical. Because of the critical nature of the gussets, a viable inspection strategy for multi-layer gusset assemblies must be developed. The premise of this research and development effort was to develop viable, field-deployable inspection approaches for this problem area. This paper presents three separate inspection approaches: two ultrasonic-based techniques and one radiographic approach. Each of these techniques was evaluated on a mock-up specimen provided by the Federal Highway Administration (FHWA) that is representative of gusseted connection from a truss bridge.

  15. Evaluation of robotic inspection systems at nuclear power plants

    International Nuclear Information System (INIS)

    White, J.R.; Eversole, R.E.; Farnstrom, K.A.; Harvey, H.W.; Martin, H.L.

    1984-03-01

    This report presents and demonstrates a cost-effective approach for robotics application (CARA) to surveillance and inspection work in existing nuclear power plants. The CARA was developed by the Remote Technology Corporation to systematically determine the specific surveillance/inspection tasks, worker hazards, and access or equipment placement restraints in each of the many individual rooms or areas at a power plant. Guidelines for designing inspection robotics are included and are based upon the modular arrangement of commercially-available sensors and other components. Techniques for maximizing the cost effectiveness of robotics are emphasized in the report including: selection of low-cost robotic components, minimal installation work in plant areas, portable systems for common use in different areas, and standardized robotic modules. Factors considered as benefits are reduced radiation exposure, lower man-hours, shorter power outage, less waste material, and improved worker safety concerns. A partial demonstration of the CARA methodology to the Sequoyah (PWR) and Browns Ferry (BWR) Plants is provided in the report along with specific examples of robotic installations in high potential areas

  16. Surface crack detection by magnetic particle inspection

    International Nuclear Information System (INIS)

    Goebbels, K.

    1988-01-01

    For ferromagnetic materials magnetic particle inspection is without doubt the most sensitive method to detect surface cracks and the least sensitive method referring to disturbing boundary conditions. Up to now the technique is based on experiments, experience, on empirical facts and on a subjective evaluation. This contribution for the first time presents a concept which allows the objective, reproducible as well as reliable magnetic particle inspection: Modelling of testing based on Maxwell's equations by finite element calculation; objective setting of test-parameters and their surveillance, handling systems, illumination and sensors, image processing and fully automated evaluation. Economy and safety of magnetic particle inspection are strongly improved by this procedure. (orig./HP) [de

  17. [Gender dysphoria in children and adolescents - treatment guidelines and follow-up study].

    Science.gov (United States)

    Meyenburg, Bernd; Kröger, Anne; Neugebauer, Rebecca

    2015-01-01

    Treatment guidelines for transidentity in children and adolescents are presently under discussion. We present an overview of the various treatment modalities. Further, follow-up data on children and adolescents referred for gender-identity problems are presented. Of the 84 patients seen for the first time more than 3 years before follow-up, 37 mailed in the completed questionnaires. In addition, 33 patients agreed to answer some short follow-up questions. We assessed steps of treatment, gender role, psychopathology, and psychotherapy. We compared differences in psychopathology in patients with vs. without gender role change and in patients with intense vs. less intense psychotherapy. A total of 22 patients had completely changed gender role, and some had started hormonal treatment und sex reassignment surgery. Most patients were satisfied with the treatment results. All patients showed less psychopathology on follow-up, independent of role change or intensity of psychotherapy. In general, the patients reported little psychopathology. Our follow-up results support the present treatment approach. In patients with little psychopathology, low-frequency supportive treatment appears sufficient to obtain safe judgement on hormonal of surgical treatment.

  18. The prevalence and influencing factors for child neglect in a rural area of Anhui province: a 2-year follow-up study.

    Science.gov (United States)

    Zhao, F; Bi, L; Chen, M-C; Wu, Y-L; Sun, Y-H

    2018-02-01

    The purpose of the current study was to identify the change of prevalence and influencing factors for child neglect in a rural area of Anhui province through the 2-year follow-up study. Longitudinal study with 2-year follow-up. Analyses were based on data from a longitudinal study, performed in five elementary schools and three secondary schools in Changfeng County. A total of 816 children aged between 7 and 16 years completed the three assessments during the period of 2009-2011. Generalized estimating equations (GEEs) were applied to identify the influencing factors of child neglect. The prevalence of child neglect was 67.8%, 56.6%, and 57.7% at the three assessments, respectively. There were 272 children (33.3%) having consistently experiencing neglect during three assessments and 106 (13.0%) children had not suffered from neglect during three assessments. Among 553 participants who experienced neglect at the first assessment, 105 (19.0%) children no longer met the diagnosis at the next two assessments. Fifty-two children who did not suffer from neglect at the first assessment experienced neglect at the final assessment. The results of GEEs showed that child neglect was clearly associated with age (odds ratio [OR] = 0.95, 95% confidence interval [CI] = 0.92-0.99, P = 0.016), male gender (OR = 1.20, 95% CI = 1.00-1.43, P = 0.047), siblings (OR = 1.26, 95% CI = 1.03-1.55, P = 0.028), parental marital disruption (OR = 2.02, 95% CI = 1.09-3.78, P = 0.027), left-behind status (OR = 1.26, 95% CI = 1.06-1.49, P = 0.008), severe family dysfunction (OR = 1.46, 95% CI = 1.03-2.07, P = 0.035), quality of life (OR = 0.98, 95% CI = 0.98-0.99, P child neglect across the three assessments. Additionally, some sociodemographic, psychosocial and family risk factors of child neglect were identified, which will be helpful for child neglect prevention strategies development and implementation in China. Copyright © 2017 The Royal Society for

  19. Right ventricular reduction for repair of functional tricuspid valve regurgitation: one-year follow up.

    Science.gov (United States)

    Ouda, Ahmed; Matschke, Klaus; Ghazy, Tamer; Speiser, Uwe; Alexiou, Konstantin; Tugtekin, Sems-Malte; Schoen, Steffen; Kappert, Utz

    2013-09-01

    The study aim was to assess the impact of reducing the right ventricular (RV) cavity in order to optimize the outcome of tricuspid valve (TV) repair in cases of functional tricuspid regurgitation (FTR) with dilated right ventricle. Between May 2007 and February 2010, a total of 17 patients (six males, 11 females; mean age 69.5 +/- 10.1 years; mean logistic EuroSCORE 24 +/- 13%) with severe FTR and severe RV dilation were included. Echocardiography and magnetic resonance imaging (MRI) were performed for geometric assessment of the right ventricle. Intraoperatively, the lateral RV free wall was plicated to reduce the RV cavum to approximate the papillary muscles and decrease tethering of the TV; a conventional ring annuloplasty was then performed. Follow up included echocardiography and MRI at one month and one year postoperatively. The mean operative time was 157 +/- 30 min, and the cross-clamp time 63 13 min. Postoperatively, the mean bleeding volume was 486 +/- 455 ml, the rethoracotomy rate 5.9%, intensive therapy unit (ITU) stay 6.0 +/- 4.4 days, and hospital stay 19.0 +/- 8.8 days. In-hospital mortality was 17.6%. The mean follow up was 14.4 +/- 2.4 months. The one-year follow up revealed a survival of 82.3%, a slight decrease in RV ejection fraction (from 33.5 +/- 4.2% to 31.7 +/- 5.7%; p = 0.13), a significant reduction in the RV end-diastolic volume index (from 160 +/- 15.6 to 128 +/- 10 ml/m2; p = 0.0001), a reduction in TV tenting area (from 3.3 +/- 0.9 to 0.9 +/- 0.3 cm2; p = 0.0001), and a significant reduction in the ratio of TR jet to right atrial surface area (from 54.8 +/- 8.2% to 14.1 +/- 3.5%; p = 0.0001). In cases of FTR, RV dilation may be considered as a correctable factor at subvalvular level to optimize the outcome of TV repair.

  20. Primary cemented total hip arthroplasty: 10 years follow-up

    Directory of Open Access Journals (Sweden)

    Nath Rajendra

    2010-01-01

    Full Text Available Background: Primary cemented total hip arthroplasty is a procedure for non-traumatic and traumatic affections of the hip. Long term follow-up is required to assess the longevity of the implant and establish the procedure. Indo-Asian literature on long term result of total hip arthroplasty is sparse. We present a 10-year follow-up of our patients of primary cemented total hip arthroplasty. Materials and Methods: We operated 31 hips in 30 patients with primary cemented total hip arthroplasty. We followed the cases for a minimum period of 10 years with a mean follow-up period of 12.7 years. The mean age of the patients was 60.7 years (range 37-82 yrs male to female ratio was 2:1. The clinical diagnoses included - avascular necrosis of femoral head (n=15, sero positive rheumatoid arthritis (n=5, seronegative spondylo-arthropathy (n=4, neglected femoral neck fractures (n=3, healed tubercular arthritis (n=2 and post traumatic osteoarthritis of hip (n=2. The prostheses used were cemented Charnley′s total hip (n=12 and cemented modular prosthesis (n=19. The results were assessed according to Harris hip score and radiographs taken at yearly intervals. Results: The mean follow-up is 12.7 yrs (range 11-16 yrs Results in all operated patients showed marked improvement in Harris hip score from preoperative mean 29.2 to 79.9 at 10 years or more followup. However, the non-inflammatory group showed more sustained long term improvement as compared to the inflammatory group, as revealed by the Harris hip score. Mean blood loss was 450ml (±3.7 ml, mean transfusion rate was 1.2 units (±.3. The complications were hypotension (n=7, shortening> 1.5 cm (n=9, superficial infection (n=2 and malposition of prosthesis (n=1. Conclusion: The needs of Indian Asian patients, vary from what is discussed in literature. The pain tolerance is greater than western population and financial constraints are high. Thus revision surgery among Indian-Asian patients is less compared

  1. POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 417: CENTRAL NEVADA TEST AREA - SURFACE, HOT CREEK VALLEY, NEVADA; FOR CALENDAR YEAR 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-04-01

    Corrective Action Unit (CAU) 417, Central Nevada Test Area - Surface, is located in Hot Creek Valley in northern Nye County, Nevada, and consists of three areas commonly referred to as UC-1, UC-3, and UC-4. CAU 417 consists of 34 Corrective Action Sites (CASs) which were closed in 2000 (U. S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, 2001). Three CASs at UC-1 were closed in place with administrative controls. At CAS 58-09-01, Central Mud Pit (CMP), a vegetated soil cover was constructed over the mud pit. At the remaining two sites CAS 58-09-02, Mud Pit and 58-09-05, Mud Pits (3), aboveground monuments and warning signs were installed to mark the CAS boundaries. Three CASs at UC-3 were closed in place with administrative controls. Aboveground monuments and warning signs were installed to mark the site boundaries at CAS 58-09-06, Mud Pits (5), CAS 58-25-01, Spill and CAS 58-10-01, Shaker Pad Area. Two CASs that consist of five sites at UC-4 were closed in place with administrative controls. At CAS 58-09-03, Mud Pits 9, an engineered soil cover was constructed over Mud Pit C. At the remaining three sites in CAS 58-09-03 and at CAS 58-10-05, Shaker Pad Area, aboveground monuments and warning signs were installed to mark the site boundaries. The remaining 26 CASs at CAU 417 were either clean-closed or closed by taking no further action. Quarterly post-closure inspections are performed at the CASs that were closed in place at UC-I, UC-3, and UC-4. During calendar year 2005, site inspections were performed on March 15, June 16, September 22, and December 7. The inspections conducted at the UC-1 CMP documented that the site was in good condition and continued to show integrity of the cover unit. No new cracks or fractures were observed until the December inspection. A crack on the west portion of the cover showed evidence of lateral expansion; however, it is not at an actionable level. The crack will be sealed by filling with

  2. Treatment of active acne with an Er:Glass (1.54 microm) laser: a 2-year follow-up study.

    Science.gov (United States)

    Angel, Sylvie; Boineau, Dominique; Dahan, Serge; Mordon, Serge

    2006-12-01

    To investigate the effects of the 1.54 microm wavelength on active lesions of the face and of the back at the 2-year follow-up. A 1.54 microm erbium:glass laser (Aramis, Quantel Medical, France) was used in combination with contact cooling set at +5 degrees C to treat acne on the face with the following parameters (3 ms, four pulses, 10 J/cm2, 2 Hz, cumulative fluence: 40 J/cm2). The laser spots were adjacent (maximum overlap: 20%) and delivered in rows in order to cover the entire area. Four treatments were performed at 4-week intervals in 25 patients with acne severity greater than 3 on the Burton scale. Acne lesion counts (papules, pustules, nodules, comedones) were performed prior to each treatment, and at 2, 4, 12, 18 and 24 months after the final treatment. Among the 25 patients, three were lost to follow-up, four were retreated. So, 18 patients had acne lesions counts 2 years after the fourth treatment. The mean percent reduction was 71% at the 6-month follow-up, 79% at the 1-year follow-up and 73% at the 2-year follow-up. No side effects were reported. All patients commented that their skin was less prone to oiliness. Biopsies taken after treatment showed progressive rarefaction and miniaturization of sebaceous glands and pilosebaceous follicles without morphologic damage to epidermal and dermal structures. Active acne can be successfully treated by selective dermal heating with a 1.54 microm erbium:glass laser coupled to contact cooling, with no related side effects. Furthermore, this longer follow-up study demonstrates long-term acne clearing. Combined treatments with medications (oral or topical) or light (targeting Propionibacterium acnes) may also improve acne clearance.

  3. Advanced inspection technology for non intrusive inspection (NII) program

    International Nuclear Information System (INIS)

    Zamir Mohamed Daud

    2003-01-01

    In the current economic environment, plants and facilities are under pressure to introduced cost saving as well as profit maximising measures. Among the many changes in the way things are run is a move towards Risk Based Inspection (RBI), with an emphasis on longer operating periods between shutdowns as well as to utilise components to their maximum capability. Underpinning and RBI program requires good data from an effective online inspections program, which would not require the shutdown of critical components. One methodology of online inspection is known as Non Intrusive Inspection (NII), an inspection philosophy with the objective of replacing internal inspection of a vessel by doing Non Destructive Testing (NDT) and inspections externally. To this end, a variety of advanced NDT techniques are needed to provide accurate online measurements. (Author)

  4. Patterns of Failure Following Multimodal Treatment for Medulloblastoma: Long-Term Follow-up Results at a Single Institution.

    Science.gov (United States)

    Lee, Dong Soo; Cho, Jaeho; Kim, Se Hoon; Kim, Dong-Seok; Shim, Kyu Won; Lyu, Chuhl Joo; Han, Jung Woo; Suh, Chang-Ok

    2015-10-01

    The purpose of this study is to investigate the long-term results and appropriateness of radiation therapy (RT) for medulloblastoma (MB) at a single institution. We analyzed the clinical outcomes of 106 patients with MB who received RT between January 1992 and October 2009. The median age was 7 years (range, 0 to 50 years), and the proportion of M0, M1, M2, and M3 stages was 60.4%, 8.5%, 4.7%, and 22.6%, respectively. The median total craniospinal irradiation (CSI) and posterior fossa tumor bed dose in 102 patients (96.2%) treated with CSI was 36 Gy and 54 Gy, respectively. The median follow-up period in survivors was 132 months (range, 31 to 248 months). A gradual improvement in survival outcomes was observed, with 5-year overall survival rates of 61.5% in 1990s increasing to 73.6% in 2000s. A total of 29 recurrences (27.4%) developed at the following sites: five (17.2%) in the tumor bed; five (17.2%) in the posterior fossa other than the tumor bed; nine (31%) in the supratentorium; and six (20.7%) in the spinal subarachnoid space only. The four remaining patients showed multiple site recurrences. Among 12 supratentorial recurrences, five cases recurred in the subfrontal areas. Although the frequency of posterior fossa/tumor bed recurrences was significantly high among patients treated with subtotal resection, other site (other intracranial/spinal) recurrences were more common among patients treated with gross tumor removal (p=0.016). There was no case of spinal subarachnoid space relapse from desmoplastic/extensive nodular histological subtypes. Long-term follow-up results and patterns of failure confirmed the importance of optimal RT dose and field arrangement. More tailored multimodal strategies and proper CSI technique may be the cornerstones for improving treatment outcomes in MB patients.

  5. Socioeconomic position and participation in baseline and follow-up visits

    DEFF Research Database (Denmark)

    Bender, Anne M; Jørgensen, Torben; Hansen, Bodil Helbech

    2012-01-01

    Background:The aim of this paper was to identify the extent of socioeconomic inequality in participation at baseline and follow-up visits.Design:The Inter99 study is a randomized intervention with the aim of investigating the effects of an individualized lifestyle consultation on ischaemic heart ...... inequality in participation at baseline and follow-up visits. Effort should be made to increase participation in individualized lifestyle interventions among persons of low socioeconomic position. Otherwise, the consequence may be increased socioeconomic inequality in IHD....

  6. The photothermal camera - a new non destructive inspection tool

    International Nuclear Information System (INIS)

    Piriou, M.

    2007-01-01

    The Photothermal Camera, developed by the Non-Destructive Inspection Department at AREVA NP's Technical Center, is a device created to replace penetrant testing, a method whose drawbacks include environmental pollutants, industrial complexity and potential operator exposure. We have already seen how the Photothermal Camera can work alongside or instead of conventional surface inspection techniques such as penetrant, magnetic particle or eddy currents. With it, users can detect without any surface contact ligament defects or openings measuring just a few microns on rough oxidized, machined or welded metal parts. It also enables them to work on geometrically varied surfaces, hot parts or insulating (dielectric) materials without interference from the magnetic properties of the inspected part. The Photothermal Camera method has already been used for in situ inspections of tube/plate welds on an intermediate heat exchanger of the Phenix fast reactor. It also replaced the penetrant method for weld inspections on the ITER vacuum chamber, for weld crack detection on vessel head adapter J-welds, and for detecting cracks brought on by heat crazing. What sets this innovative method apart from others is its ability to operate at distances of up to two meters from the inspected part, as well as its remote control functionality at distances of up to 15 meters (or more via Ethernet), and its emissions-free environmental cleanliness. These make it a true alternative to penetrant testing, to the benefit of operator and environmental protection. (author) [fr

  7. Hyperfunctioning thyroid cancer: a five-year follow-up.

    Science.gov (United States)

    Azevedo, Monalisa Ferreira; Casulari, Luiz Augusto

    2010-02-01

    Differentiated thyroid cancer rarely occurs in association with hyperfunctioning nodules. We describe a case of a 47-year-old woman who developed symptoms of hyperthyroidism associated with a palpable thyroid nodule. Thyroid scintigraphy showed an autonomous nodule, and fine-needle aspiration biopsy was suggestive of papillary carcinoma. Laboratorial findings were consistent with the diagnosis of hyperthyroidism. The patient underwent thyroidectomy and a papillary carcinoma of 3.0 x 3.0 x 2.0 cm, follicular variant, was described by histological examination. The surrounding thyroid tissue was normal. Postoperatively, the patient received 100 mCi of (131)I, and whole body scans detected only residual uptake. No evidence of metastasis was detected during five years of follow-up. Hot thyroid nodules rarely harbor malignancies, and this case illustrated that, when a carcinoma occurs the prognosis seems to be very good with no evidence of metastatic dissemination during a long-term follow-up.

  8. A follow-up study by CT and MRI in 3 cases of Japanese encephalitis

    International Nuclear Information System (INIS)

    Shoji, H.; Murakami, T.; Murai, I.; Kida, H.; Sato, Y.; Kojima, K.; Abe, T.; Okudera, T.

    1990-01-01

    A follow-up study by CT and MRI in 3 cases of Japanese encephalitis (JE) was performed. Neurologically dementia, forced laughing, tetraplegia and parkinsonism were observed as sequelae. In the CT and MR scans about 3 years after the onset of JE, low-density areas (LDAs) or abnormal signal intensities had remained in the thalamus and basal ganglia. The abnormalities were also found in the brain stem. When the main lesions shown by CT and MRI were compared with those of the acute stage, T2-weighted MRI clearly revealed multiple small areas with high signal intensities, although the ones at the acute stage had showed diffuse abnormal signals. These findings may be useful in helping to identity a long time after the onset. (orig.)

  9. POST CLOSURE INSPECTION AND MONITORING REPORT FOR CORRECTIVE ACTION UNIT 417: CENTRAL NEVADA TEST AREA - SURFACE, HOT CREEK VALLEY, NEVADA, FOR CALENDAR YEAR 2004

    Energy Technology Data Exchange (ETDEWEB)

    BECHTEL NEVADA; NNSA NEVADA SITE OFFICE

    2005-04-01

    This post-closure inspection and monitoring report has been prepared according to the stipulations laid out in the Closure Report (CR) for Corrective Action Unit (CAU) 417, Central Nevada Test Area (CNTA)--Surface (U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office [NNSA/NV], 2001), and the Federal Facility Agreement and Consent Order (FFACO, 1996). This report provides an analysis and summary of site inspections, subsidence surveys, meteorological information, and soil moisture monitoring data for CAU 417, which is located in Hot Creek Valley, Nye County, Nevada. This report covers Calendar Year 2004. Inspections at CAU 417 are conducted quarterly to document the physical condition of the UC-1, UC-3, and UC-4 soil covers, monuments, signs, fencing, and use restricted areas. The physical condition of fencing, monuments, and signs is noted, and any unusual conditions that could impact the integrity of the covers are reported. The objective of the soil moisture monitoring program is to monitor the stability of soil moisture conditions within the upper 1.2 meters (m) (4 feet [ft]) of the UC-1 Central Mud Pit (CMP) cover and detect changes that may be indicative of moisture movement exceeding the cover design performance expectations.

  10. Laparoscopic splenectomy in pediatric age: long-term follow-up.

    Science.gov (United States)

    Ates, Ufuk; Tastekin, Nil Y; Gollu, Gulnur; Ergun, Ergun; Yagmurlu, Aydin

    2017-12-01

    In the last century, with the advancement of the diagnostic procedures, hematologic disorders in pediatric age group have been increased dramatically. In parallel with this increase, splenectomy procedures have also been popularized with different techniques and surgical outcomes. Laparoscopic splenectomy (LS) in the pediatric age group is generally accepted as a technically demanding procedure, which needs experience. The purpose of this study is to present the long-term follow-up results of a case series of children who underwent LS for a variety of hematologic disorders, evaluate possible complications and outcomes. All patients who were admitted to the clinic and who were scheduled for LS from 2005 to 2016 were considered for this study. The study parameters were grouped in four categories including socio-demographic data, preoperative evaluation, clinical follow-up and complications. There were 24 male (48.9%) and 25 (51.1%) female patients. The median age and body weight for the study group was 12 years and 35 kg. Most common indications for LS were thalassemia (13; 26.5%) and hereditary spherocytosis (12; 24.4%). As a technical standpoint, 2 patients (4%) underwent singleport LS surgery. The mean time for LS surgeries was found as 80 minutes. The total intraoperative complication rate was 4% (2/57). The mean time for hospital stay was 5 days. Mean follow-up period was 6.4 years (range: 6 months-16 years). There was no long-term complication. Bilirubin levels and need for blood transfusion significantly decreased in the long term follow-up period (p <0.05). LS is a powerful tool in the hands of an experienced surgeon. It's a safe and effective procedure in children with hematologic disorders resulting in shorter length of stay and lower complication rates. Sociedad Argentina de Pediatría

  11. TESS Follow-up Observing Programs at the University of Wyoming

    Science.gov (United States)

    Jang-Condell, Hannah; Kasper, David; Kar, Aman; Sorber, Rebecca; Hancock, Daniel A.; Leuquire, Jacob D.; Suhaimi, Afiq; Kobulnicky, Henry A.; Pierce, Michael; Pilachowski, Catherine A.

    2018-06-01

    The Transiting Exoplanet Survey Satellite (TESS), launched in Spring 2018, will detect thousands of new exoplanet candidates. These candidates will need to be vetted by ground-based observatories to rule out false positives. The Observatories at the University of Wyoming are well-positioned to take active roles in TESS Follow-Up Observing Program (TFOP) Working Groups. The 0.6-m Red Buttes Observatory has already demonstrated its capability to do precision photometric monitoring of transiting exoplanet targets as a participant in the Kilodegree Extremely Little Telescope Follow-Up Network (KELT-FUN). A new echelle spectrograph, Fiber High-Resolution Echelle (FHiRE), being built for the 2.3-m Wyoming InfraRed Observatory (WIRO), will enable precision radial velocity measurements of exoplanet candidates. Over 180 nights/year at both observatories will be available to our team to undertake follow-up observations of TESS Objects of Interest (TOIs). We anticipate making significant contributions to new exoplanet discoveries in the era of TESS.

  12. Complications and Follow-up after Unprotected Carotid Artery Stenting

    International Nuclear Information System (INIS)

    Hauth, Elke A.M.; Drescher, Robert; Jansen, Christian; Gissler, H. Martin; Schwarz, Michael; Forsting, Michael; Jaeger, Horst J.; Mathias, Klaus D.

    2006-01-01

    Purpose. This prospective study was undertaken to determine the success rate, complications, and outcome of carotid artery stenting (CAS) without the use of cerebral protection devices. Methods. During 12 months, 94 high-grade stenoses of the carotid artery in 91 consecutive patients were treated. Sixty-six (70%) of the stenoses were symptomatic and 28 (30%) were asymptomatic. Results. In all 94 carotid stenoses CAS was successfully performed. During the procedure and within the 30 days afterwards, there were 2 deaths and 3 major strokes in the 66 symptomatic patients, resulting in a combined death and stroke rate of 5 of 66 (7%). Only one of these complications, a major stroke, occurred during the procedure. In the 6-month follow-up, one additional major stroke occurred in a originally symptomatic patient resulting in a combined death and stroke rate of 6 of 66 (10%) for symptomatic patients at 6 months. No major complications occurred in asymptomatic patients during the procedure or in the 6-month follow-up period. At 6 months angiographic follow-up the restenosis rate with a degree of >50% was 3 of 49 (6%) and the rate with a degree of ≥70% was 1 of 49 (2%). Conclusions. Cerebral embolization during CAS is not the only cause of the stroke and death rate associated with the procedure. The use of cerebral protection devices during the procedure may therefore not prevent all major complications following CAS

  13. Nuclear fuel pellet inspection system

    International Nuclear Information System (INIS)

    Ahmed, H.J.; Beatty, J.M.; Kugler, R.W.

    1992-01-01

    At least one axially extending linear portion of the peripheral surface of the pellet is optically sensed, a set of digital values representative of the pellet surface is generated, and the set is compared to a predetermined standard. Groups of adjacent locations on the surface of the pellet having values greater or less than the predetermined standard are identified, and the pellet is rejected, when a flawed area exceeds a predetermined size. During inspection, the pellet is moved axially through an inspection station by parallel support rolls, spaced by a distance less than the pellet diameter. The rolls are rotated upward and outward from each other, rotating the pellet, and chain dogs are positioned between the spaced rolls for engaging a pellet and moving it along the rolls. The pellet is rejected if its peripheral surface area is too great, and a reference pellet may be used. (author)

  14. Development of ultrasonic immersion inspection technique for spent fuel canisters

    International Nuclear Information System (INIS)

    Schankula, J.J.

    1982-07-01

    This report summarizes ultrasonic nondestructive testing development for metal matrix supported spent fuel disposal canisters. The work has concentated in two areas: inspection for lack of bond at the shell/matrix interface and inspection for voids in the matrix. The capabilities and limitations of these techniques have been fully established. Unbonded areas as small as 4 mm in diameter and voids 6 mm in diameter, 25 mm deep in the matrix, can readily be detected

  15. Profile and pattern of follow-ups of psychiatry outpatients at Christian Medical College, Ludhiana

    Directory of Open Access Journals (Sweden)

    Mamta Singla

    2015-01-01

    Full Text Available Context: As psychiatric illness requires long-term treatment, some patients are lost to follow-up. Aims: The present study aimed to find the follow-up pattern of psychiatric patients attending psychiatry outpatient department (OPD and to determine the correlation of follow-up with socio-demographic profile and diagnosis, if any. Settings and Design: This study was a retrospective data analysis study carried out at the OPD of Psychiatry, Christian Medical College and Hospital, Ludhiana. Subjects and Methods: New cases attending the OPD from April 2010 to March 2011 were included in this study. The data were scrutinized 1 year after the initial assessment. Socio-demographic data, diagnosis and follow-up information were obtained from the files. The collected data were statistically analyzed. Statistical Analysis Used: Chi-square and P value. Results: 53.1% of the patients dropped out after first visit, 29.4% patients had 1-3 follow-up, 14.9% had 4-10 follow-ups and only 2.6% had more than 10 follow-ups. Correlation between follow-up and various socio-demographic variables such as age, gender, place of living or distance from hospital, occupation, religion and marital status was not statistically significant. It was, however, seen that cognitive disorders, conversion disorder, mental retardation, and patients in which diagnosis was deferred, had more dropout rate after first visit. Conclusions: In our study 53.1% of the patients did not attend follow-up at all and only 2.6% had more than 10 follow ups. Correlation between follow-up and various socio-demographic variables was not statistically significant. Patients in which diagnosis was deferred had more drop out rate than patients who had a diagnosis and the difference was statistically significant.

  16. Mortality in acromegaly: a 20-year follow-up study.

    Science.gov (United States)

    Ritvonen, Elina; Löyttyniemi, Eliisa; Jaatinen, Pia; Ebeling, Tapani; Moilanen, Leena; Nuutila, Pirjo; Kauppinen-Mäkelin, Ritva; Schalin-Jäntti, Camilla

    2016-06-01

    It is unclear whether mortality still is increased in acromegaly and whether there are gender-related differences. We dynamically assessed outcome during long-term follow-up in our nationwide cohort. We studied standardized mortality ratios (SMRs) relative to the general population and causes of death in acromegaly (n=333) compared with age- and gender-matched controls (n=4995). During 20 (0-33) years follow-up, 113 (34%) patients (n=333, 52% women) and 1334 (27%) controls (n=4995) died (P=0.004). SMR (1.9, 95% CI: 1.53-2.34, Pacromegaly. Overall distribution of causes of death (Pacromegaly, but not in controls, causes of deaths shifted from 44% cardiovascular and 28% cancer deaths during the first decade, to 23% cardiovascular and 35% cancer deaths during the next two decades. In acromegaly, cancer deaths were mostly attributed to pancreatic adenocarcinoma (n=5), breast (n=4), lung (n=3) and colon (n=3) carcinoma. In acromegaly, men were younger than women at diagnosis (median 44.5 vs 50 years, Pacromegaly, men are younger at diagnosis and death than women. Compared with controls, mortality is increased during 20 years of follow-up, especially in women. Causes of deaths shift from predominantly cardiovascular to cancer deaths. © 2016 Society for Endocrinology.

  17. Plant inspection tours with mobile data logging system

    International Nuclear Information System (INIS)

    Roesser, U.

    2006-01-01

    The MDE Mobile Data Logging System has been introduced in a number of German power plants for efficient logging, evaluation, and quality-assured documentation of data recorded on plant inspection tours by means of pocket PCs instead of slips of paper. It will be installed in other nuclear power plants in the near future. The MDE system is composed of the pocket PCs for logging data during plant inspection tours, the associated docking stations installed in the respective areas of application, one PC or, if necessary, several PCs with the appropriate user software, and the associated network links. To install the software in the power plant, lists of rooms and measurement stations as well as other positions on an inspection course are transmitted to the MDE system. When the system has been commissioned, inspection tours are planned in accordance with past experience and optimized in the computer. User experience is taken into account in program updates. New functions improve user comfort and ease of evaluation. Additions to the MDE software, and applications in other areas, are tentatively planned and will be implemented as the need arises. (orig.)

  18. Follow-up CT Evaluation of the Mural Changes in Active Takayasu Arteritis

    International Nuclear Information System (INIS)

    Kim, Sang Young; Park, Jae Hyung; Chung, Jin Wook; Kim, Hyo Cheol; Lee, Whal; So, Young Ho; Jae, Hwan Jun

    2007-01-01

    We wanted to evaluate the mural changes by CT on the follow-up examination of patients with active Takayasu arteritis. The study included 18 patients, (4 males and 14 females), with active Takayasu arteritis. A total of 44 CT examinations were done during the follow-up period (mean: 55.6 months). At the time of the last follow-up CT, the disease, on the basis of the erythrocyte sedimentation rate (ESR), was found to be inactive in five patients and the disease was active and persistent in 13 patients. The thickness and CT attenuation of the aortic wall on the precontrast, arterial and venous phases were measured on the initial and the follow-up CT examinations. The ratio of the mural attenuation over that of the back muscle on the initial CT was compared with the ratio found on the follow-up CT. The initial CT findings included high density and calcifications of the aortic wall in the precontrast images and a thickened wall with enhancements in the arterial and the venous phases. A low-attenuation ring was demonstrated in the venous phase in 15 patients (83%). On the follow-up evaluation, the mean mural thickness decreased significantly from 4.1 mm to 2.4 mm. The mean mural attenuation ratio in the venous phase decreased significantly from 1.9 to 1.3 (p 0.001). The low attenuation ring was identified in seven patients (39%) who had only with active, persistent Takayasu arteritis. The mural changes demonstrated by the follow-up CT evaluations for the patients with active Takayasu arteritis included a decrease of the mural thickness and enhancement, disappearance of the low-attenuation ring on the venous phase, and an increase of the mural attenuation and calcification on the precontrast phase

  19. Calculation of frequency of optimal inspection in non-notice inspection game

    International Nuclear Information System (INIS)

    Kumakura, Shinichi; Gotoh, Yoshiki; Kikuchi, Masahiro

    2011-01-01

    We consider a non-notice inspection game between an inspection party, who verifies absence of diversion of nuclear materials and misuse of nuclear facility, and a facility operator, who tries them in a nuclear facility. In the game, the payoff for each player, inspection party and facility operator, is composed of various elements (parameters) such as facility type, a type of nuclear material, number of inspection and others. Their payoffs consist of profits and costs (minus profit). Because of random nature by non-notice inspection, its deterrence effect and inspection number could have the potential to affect their payoffs. In this paper, their payoffs taking into consideration of the inspection environment above are represented as a function of inspection number. Then, the optimal number is calculated from a condition on their payoffs for number of inspection. Comparable statics analysis is performed in order to observe the change of inspection number which is equilibrium point by changing these parameters including deterrence effect, because the number derived depends on each parameter within the inspection environment. Based on the analysis results, necessary conditions to reduce the inspection number keeping inspection effect are pointed out. (author)

  20. Polyurethane-Coated Breast Implants Revisited: A 30-Year Follow-Up

    Directory of Open Access Journals (Sweden)

    Nikki Castel

    2015-03-01

    Full Text Available BackgroundPolyurethane coating of breast implants has been shown to reduce capsular contracture in short-term follow-up studies. This 30-year study is the longest examination of the use of polyurethane-coated implants and their correlation with capsular contracture.MethodsThis study evaluates the senior surgeon's (F.D.P. experience with the use of polyurethane-coated implants in aesthetic breast augmentation in 382 patients over 30 years. Follow-up evaluations were conducted for six months after surgery. After the six-month follow-up period, 76 patients returned for reoperation. The gross findings, histology, and associated capsular contracture were noted at the time of explantation.ResultsNo patient during the six-month follow-up period demonstrated capsular contracture. For those who underwent reoperation for capsular contracture, Baker II/III contractures were noted nine to 10 years after surgery and Baker IV contractures were noted 12 to 21 years after surgery. None of the explanted implants had macroscopic evidence of polyurethane, which was only found during the first five years after surgery. The microscopic presence of polyurethane was noted in all capsules up to 30 years after the original operation.ConclusionsAn inverse correlation was found between the amount of polyurethane coating on the implant and the occurrence of capsular contracture. Increasingly severe capsular contracture was associated with a decreased amount of polyurethane coating on the surface of the implants. No contracture occurred in patients whose implants showed incomplete biodegradation of polyurethane, as indicated by the visible presence of polyurethane coating. We recommend research to find a non-toxic, non-biodegradable synthetic material as an alternative to polyurethane.

  1. Accidental exposure to biological material in healthcare workers at a university hospital: Evaluation and follow-up of 404 cases.

    Science.gov (United States)

    Gutierrez, Eliana Battaggia; Lopes, Marta Heloísa; Yasuda, Maria Aparecida Shikanai

    2005-01-01

    The care and follow-up provided to healthcare workers (HCWs) from a large teaching hospital who were exposed to biological material between 1 August 1998 and 31 January 2002 is described here. After exposure, the HCW is evaluated by a nurse and doctor in an emergency consultation and receives follow-up counselling. The collection of 10 ml of blood sample from each HCW and its source patient, when known, is made for immunoenzymatic testing for HIV, HBV and HCV. Evaluation and follow-up of 404 cases revealed that the exposures were concentrated in only a few areas of the hospital; 83% of the HCWs exposed were seen by a doctor responsible for the prophylaxis up to 3 h after exposure. Blood was involved in 76.7% (309) of the exposures. The patient source of the biological material was known in 80.7% (326) of the exposed individuals studied; 80 (24.5%) sources had serological evidence of infection with 1 or more agents: 16.2% were anti-HCV positive, 3.8% were HAgBs positive and 10.9% were anti-HIV positive. 67% (273) of the study population completed the proposed follow-up. No confirmed seroconversion occurred. In conclusion, the observed adherence to the follow-up was quite low, and measures to improve it must be taken. Surprisingly, no difference in adherence to the follow-up was observed among those exposed HCW at risk, i.e. those with an infected or unknown source patient. Analysis of post-exposure management revealed excess prescription of antiretroviral drugs, vaccine and immunoglobulin. Infection by HCV is the most important risk of concern, in our hospital, in accidents with biological material.

  2. What Happens Next? Follow-Up From the Children's Toddler School Program.

    Science.gov (United States)

    Akshoomoff, Natacha; Stahmer, Aubyn C; Corsello, Christina; Mahrer, Nicole E

    2010-10-01

    This study was a follow-up of a group of 29 children diagnosed with autism spectrum disorders at age 2 who attended an inclusive toddler program until age 3. Children ranged in age from 4 to 12 years at the time of the parent survey and follow-up testing. The majority of children were placed in a special education (noninclusive) preschool class, but among the children who were in elementary school at the time of follow-up, 63% were in general education classroom placement. Diagnoses of autism spectrum disorders remained stable, socialization skills remained a weakness, and child-related parental stress remained high despite average cognitive and language skills in the majority of children. Social skill development and support remained a service need.

  3. Contract Report for Usage Inspection of KN-12 Transport Cask

    International Nuclear Information System (INIS)

    Lee, J. C.; Seo, K. S.; Bang, K. S.; Cho, I. J.; Kim, D. H.; Min, D. K.

    2007-03-01

    The usage inspection of the KN-12 spent nuclear fuel transport package was performed to receive the license for reuse. According to the Korea Atomic Energy Act, all type B transport package should receive and pass the usage inspection every five years. The KN-12 transport cask was designed to transport twelve spent PWR fuel assemblies under wet and dry conditions. The cask was developed and licensed in 2002 in accordance with the Korea and the IAEA's safe transport regulations. The areas of usage inspection include: visual inspection, nondestructive weld inspection, load test, maximum operating pressure test, leakage test, shielding test, thermal test, external surface contamination test. In the results of the usage inspection, the damage or defect could not found out and the performance of the cask was maintained according to the requirements of the regulation. Therefore, the usage inspection was successfully performed to acquire the license for the reuse

  4. Increased Risk of Clinically Significant Gallstones following an Appendectomy: A Five-Year Follow-Up Study.

    Directory of Open Access Journals (Sweden)

    Shiu-Dong Chung

    Full Text Available Although the vermiform appendix is commonly considered a vestigial organ, adverse health consequences after an appendectomy have garnered increasing attention. In this study, we investigated the risks of gallstone occurrence during a 5-year follow-up period after an appendectomy, using a population-based dataset. We used data from the Taiwan Longitudinal Health Insurance Database 2005. The exposed cohort included 4916 patients who underwent an appendectomy. The unexposed cohort was retrieved by randomly selecting 4916 patients matched with the exposed cohort in terms of sex, age, and year. We individually tracked each patient for a 5-year period to identify those who received a diagnosis of gallstones during the follow-up period. Cox proportional hazard regressions were performed for the analysis. During the 5-year follow-up period, the incidence rate per 1000 person-years was 4.71 for patients who had undergone an appendectomy, compared to a rate of 2.59 for patients in the unexposed cohort (p<0.001. Patients who had undergone an appendectomy were independently associated with a 1.79 (95% CI = 1.29~2.48-fold increased risk of being diagnosed with gallstones during the 5-year follow-up period. We found that among female patients, the adjusted hazard ratio of gallstones was 2.25 (95% CI = 1.41~3.59 for patients who underwent an appendectomy compared to unexposed patients. However, for male patients, we failed to observe an increased hazard for gallstones among patients who underwent an appendectomy compared to unexposed patients. We found an increased risk of a subsequent gallstone diagnosis within 5 years after an appendectomy.

  5. Post-Closure Inspection and Monitoring Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2006-01-01

    This report provides a summary and analysis of visual site inspections and soil gas sampling results for Corrective Action Unit (CAU) 342, Area 23 Mercury Fire Training Pit. CAU 342 is identified in the Federal Facility Agreement and Consent Order of 1996 and consists of Corrective Action Site 23-56-01, Former Mercury Fire Training Pit. This report covers calendar years 2004 and 2005. Visual site inspections were conducted on May 20 and November 14, 2004, and May 17 and November 15, 2005. No significant findings were observed during these inspections. The site was in good condition, and no repair activities were required. Soil gas samples were collected on November 29, 2005, for analysis of volatile organic compounds (VOCs) and semivolatile organic compounds (SVOCs), and samples were collected on December 1, 2005, for analysis of base gases. Base gas concentrations in the monitoring well show a high concentration of carbon dioxide and a low concentration of oxygen, which is an indication of biodegradation of total petroleum hydrocarbons (TPH) in the soil. Results for VOCs and SVOCs are unchanged, with VOCs below or near laboratory method detection limits and no SVOCs detected above laboratory method detection limits. Post-closure monitoring was required for six years after closure of the site. Therefore, since 2005 was the sixth year of monitoring, the effectiveness of natural attenuation of the TPH-impacted soil by biodegradation was evaluated. The base gas concentrations indicate that biodegradation of TPH in the soil is occurring; therefore, it is recommended that monitoring be discontinued. Visual site inspections should continue to be performed biannually to ensure that the signs are in place and readable and that the use restriction has been maintained. The results of the site inspections will be documented in a letter report and submitted annually

  6. Feasibility of an EIS Follow-up Program

    International Nuclear Information System (INIS)

    Nelson, I.C.; Jaquish, R.E.; Watson, D.G.

    1982-12-01

    The proposed level of an EIS Follow-up Program is believed to be feasible and that it can and should be implemented. Guidance to authors should result in fewer, but more important, commitments for mitigating adverse environmental impacts. Selecting the significant commitments from Records of Decisions published since July 1, 1979 for tracking to satisfaction should result in conformance with regulations, orders, and the intent of the NEPA

  7. 29 CFR 1956.84 - Location of plan for inspection and copying.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Location of plan for inspection and copying. 1956.84... PLANS Illinois § 1956.84 Location of plan for inspection and copying. A copy of the plan may be inspected and copied during normal business hours at the following locations: Office of State Programs, U.S...

  8. Report on the Regulatory Experience of Risk-Informed In-service Inspection of Nuclear Power Plant Components and Common Views (consensus document)

    International Nuclear Information System (INIS)

    2004-08-01

    The present report represents the work product of the activities conducted by the Task Force. The TF performed a review and inventory of the existing approaches to risk-informed inservice inspection and testing, and completed its work in 1999 with a Current Practices Document 2, titled Report on risk-informed in-service inspection and in-service testing (EUR 19153 EN). In November 2001, the NRWG held a Special session on risk-informed applications, with emphasis on risk-informed inservice inspection, where results and experiences from pilot studies on risk-informed inservice inspection (RI-ISI), performed in several European countries, were presented and discussed. As a follow-up in May 2002, the TF was reconvened with the objectives to analyse from the regulatory point of view key aspects associated with the application of risk-informed inservice inspection, and to go beyond a state of the art report, presenting a series of recommendations of good practices or common positions reached by the regulators represented in the Task Force. (author)

  9. 2016 Annual Inspection and Radiological Survey Results for the Piqua, Ohio, Decommissioned Reactor Site, July 2016

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, Brian [USDOE Office of Legacy Management, Washington, DC (United States); Miller, Michele [Navarro Research and Engineering, Oak Ridge, TN (United States)

    2016-07-01

    This report presents the findings of the annual inspection and radiological survey of the Piqua, Ohio, Decommissioned Reactor Site (site). The decommissioned nuclear power demonstration facility was inspected and surveyed on April 15, 2016. The site, located on the east bank of the Great Miami River in Piqua, Ohio, was in fair physical condition. There is no requirement for a follow-up inspection, partly because City of Piqua (City) personnel participated in a March 2016 meeting to address reoccurring safety concerns. Radiological survey results from 104 locations revealed no removable contamination. One direct beta activity reading in a floor drain on the 56-foot level (1674 disintegrations per minute [dpm]/100 square centimeters [cm2]) exceeded the minimum detectable activity (MDA). Beta activity has been detected in the past at this floor drain. The reading was well below the action level of 5000 dpm/100 cm2.

  10. Schizophrenia: a five-year follow-up of patient outcome following psycho-education for caregivers.

    LENUS (Irish Health Repository)

    McWilliams, S

    2012-01-01

    There is evidence that psycho-education courses for caregivers of individuals with schizophrenia improve the short-term outcome of the condition. However, most of the outcome studies are limited to two-year follow-up.

  11. POST-CLOSURE INSPECTION REPORT FOR CORRECTIVE ACTION UNIT 92: AREA 6 DECON PAD FACILITY, NEVADA. TEST SITE NEVADA, FOR THE PERIOD JANUARY 2004 - DECEMBER 2004

    International Nuclear Information System (INIS)

    BECHTEL NEVADA

    2005-01-01

    This Post-Closure Inspection Report provides an analysis and summary of inspections for Corrective Action Unit (CAU) 92, Area 6 Decon Pond Facility, Nevada Test Site, Nevada. CAU 92 was closed in accordance with the Resource Conservation and Recovery Act (RCRA) Part B Operational Permit (Nevada Division of Environmental Protection, 1995) and the Federal Facility Agreement and Consent Order of 1996 on May 11, 1999. CAU 92 consists of two Corrective Action Sites (CASs): CAS 06-04-01, Decon Pad oil/Water Separator; and CAS 06-05-02, Decontamination Pond (RCRA). Both CASs have use restrictions; however, only CAS 06-05-02, Decontamination Pond (RCRA), requires post-closure inspections. CAS 06-04-01, Decon Pad Oil/Water Separator, is located inside the fence at the Building 6-605 compound. This report covers the annual period January 2004 through December 2004

  12. FOLLOW-UP DATA ON 179 DANISH CHILDREN AFTER THEIR FIRST PYELONEPHRITIS

    DEFF Research Database (Denmark)

    Breinbjerg, Anders; Kamperis, Konstantinos; Frøkjær, Jørgen

    Introduction: Controversy exists regarding follow-up investigations in children diagnosed with their first pyelonephritis. In our centre children with upper urinary tract infections are subjected to a DMSA or MAG3 scan to assess renal parenchymal damage app. 6 months following the UTI. We aimed...... to analyse follow-up data on 179 consecutive Danish children after their first pyelonephritis. Material and methods:We examined the records of children diagnosed with their first upper UTI confirmed by urine culture during the years 2011-2013.We collected data on the clinical course of the pyelonephritis...

  13. 38 CFR 41.315 - Audit findings follow-up.

    Science.gov (United States)

    2010-07-01

    ... include audit findings from multiple years, it shall include the fiscal year in which the finding... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Audit findings follow-up... (CONTINUED) AUDITS OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Auditees § 41.315 Audit...

  14. School Nurse Inspections Improve Handwashing Supplies

    Science.gov (United States)

    Ramos, Mary M.; Schrader, Ronald; Trujillo, Rebecca; Blea, Mary; Greenberg, Cynthia

    2013-01-01

    BACKGROUND Handwashing in the school setting is important for infectious disease control, yet maintaining adequate handwashing supplies is often made difficult by lack of funds, limited staff time, and student vandalism. This study measured the availability of handwashing supplies for students in New Mexico public schools and determined the impact of scheduled school nurse inspections on the availability of handwashing supplies. METHODS Participating school districts in New Mexico were matched by size and randomized into intervention and control groups. Baseline inspections were conducted in November 2008 followed by 2 subsequent bimonthly inspections. For each student bathroom, the presence or absence of soap and either paper towels or hand dryers was indicated on an inspection checklist. The intervention group reported findings to the New Mexico Department of Health (NMDOH) and to school administrative and custodial staff requesting that any identified problems be addressed. The control group reported inspection findings to the NMDOH only. Descriptive analyses were conducted to determine the proportion of bathrooms with soap and either paper towels or hand dryers. Comparisons were made between the intervention schools and the control schools at baseline and during the intervention period. RESULTS The intervention group had significantly higher probability of bathrooms being supplied with soap (p school nurse inspections of hand hygiene supplies, with reporting to appropriate school officials, can improve the availability of handwashing supplies for students. PMID:21592131

  15. Follow-up of basal cell carcinomas: an audit of current practice.

    Science.gov (United States)

    Mc Loone, N M; Tolland, J; Walsh, M; Dolan, O M

    2006-07-01

    Follow-up of patients after treatment of basal cell carcinoma (BCC) allows for monitoring of recurrence and detection of new tumours, but adds a significant burden to outpatient clinics. At the skin tumour clinic in the dermatology department, the Royal Hospitals, Belfast, all patients are reviewed for 2 years after surgical excision of a low-risk primary BCC. An audit was undertaken to determine the quality of data set recorded relating to prognostic factors for BCCs to determine the rate of recurrence and number of new primary tumours detected and to determine the completeness of follow-up by patients. Patients who had primary BCCs treated by excision were identified from a database held at the clinic. Medical charts were reviewed to determine data recorded about lesions, the number of recurrent BCCs and new tumours detected, and the number of patients completing follow-up. Between January 1999 and December 2000, 114 patients had 121 primary BCCs excised. BCC location and size were recorded in 100% and 35% of cases, respectively. Histological type was stated for morphoeic or multifocal lesions. Two years of follow-up was completed by 53% of patients and 1 year by 78% of patients. The rate of recurrence was low, with 2 BCC recurring within 2 years of excision. The risk of developing a new BCC was 11.6% in the first year and 6.3% in the second year. Follow-up of patients after excision of a low-risk BCC at the clinic has been reduced to 1 year. A proforma has been developed to encourage documentation of prognostic factors.

  16. Breast cancer follow-up: from the perspective of health professionals and patients

    NARCIS (Netherlands)

    Kwast, A.B.G.; Drossaert, Constance H.C.; Siesling, Sabine

    2013-01-01

    Increased breast cancer incidence and better survival have raised the number of patients requiring follow-up care. Despite guidelines, there is controversy about appropriate breast cancer follow-up. Therefore, semi-structured interviews were conducted in two hospitals with 23 patients and 18 health

  17. Actinic Mask Inspection at the ALS Initial Design Review

    International Nuclear Information System (INIS)

    Barty, A; Chapman, H; Sweeney, D; Levesque, R; Bokor, J; Gullikson, E; Jong, S; Liu, Y; Yi, M; Denbeaux, G; Goldberg, K; Naulleau, P; Denham, P; Rekawa, S; Baston, P; Tackaberry, R; Barale, P

    2003-01-01

    This report is the first milestone report for the actinic mask blank inspection project conducted at the VNL, which forms sub-section 3 of the Q1 2003 mask blank technology transfer program at the VNL. Specifically this report addresses deliverable 3.1.1--design review and preliminary tool design. The goal of this project is to design an actinic mask inspection tool capable of operating in two modes: high-speed scanning for the detection of multilayer defects (inspection mode), and a high-resolution aerial image mode in which the image emulates the imaging illumination conditions of a stepper system (aerial image or AIM mode). The purpose and objective of these two modes is as follows: (1) Defect inspection mode--This imaging mode is designed to scan large areas of the mask for defects EUV multilayer coatings. The goal is to detect the presence of multilayer defects on a mask blank and to store the co-ordinates for subsequent review in AIM mode, thus it is not essential that the illumination and imaging conditions match that of a production stepper. Potential uses for this imaging mode include: (a) Correlating the results obtained using actinic inspection with results obtained using other non-EUV defect inspection systems to verify that the non-EUV scanning systems are detecting all critical defects; (b) Gaining sufficient information to associate defects with particular processes, such as various stages of the multilayer deposition or different modes of operation of the deposition tool; and (c) Assessing the density and EUV impact of surface and multilayer anomalies. Because of the low defect density achieved using current multilayer coating technology it is necessary to be able to efficiently scan large areas of the mask in order to obtain sufficient statistics for use in cross-correlation experiments. Speed of operation as well as sensitivity is therefore key to operation in defect inspection mode. (2) Aerial Image Microscope (AIM) mode--In AIM mode the tool is

  18. Patients’ follow-up using biomechanical analysis of rehabilitation exercises

    Directory of Open Access Journals (Sweden)

    Bruno Bonnechère

    2017-03-01

    Full Text Available Thanks to the evolution of game controllers video games are becoming more and more popular in physical rehabilitation. The integration of serious games in rehabilitation has been tested for various pathologies. Parallel to this clinical research, a lot of studies have been done in order to validate the use of these game controllers for simple biomechanical evaluation. Currently, it is thus possible to record the motions performed by the patients during serious gaming exercises for later analysis. Therefore, data collected during the exercises could be used for monitoring the evolution of the patients during long term rehabilitation. Before using the parameters extracted from the games to assess patients’ evolution two important aspects must be verified: the reproducibility of measurement and a possible effect of learning of the task to be performed. Ten healthy adults played 9 sessions of specific games developed for rehabilitation over a 3-weeks period. Nineteen healthy children played 2 sessions to study the influence of age. Different parameters were extracted from the games: time, range of motion, reaching area. Results of this study indicates that it is possible to follow the evolution of the patients during the rehabilitation process. The majority of the learning effect occurred during the very first session. Therefore, in order to allow proper regular monitoring, the results of this first session should not be included in the follow-up of the patient.

  19. Inspection Qualification Centre in NPP 'Kozloduy'

    International Nuclear Information System (INIS)

    Mikhovski, M.

    2000-01-01

    In May 1999 according to the working plan of the IAEA project RER 4/020 and the decision of the NPP the Inspection Qualification Centre (IQC) has been established in order to provide examination services in the NPP. During year 1999 IVC (AEA Technology) in the framework of the DTI project provides consulting and technical assistance to the NPP, IQC, Bulgarian Academy of Sciences and Regulatory Authorities in setting up the IQC infrastructure. Now IQC work as an independent inspection body B type. The IQC activities for the period 1999-2000 are presented and further tasks are outlined

  20. From themes to hypotheses: following up with quantitative methods.

    Science.gov (United States)

    Morgan, David L

    2015-06-01

    One important category of mixed-methods research designs consists of quantitative studies that follow up on qualitative research. In this case, the themes that serve as the results from the qualitative methods generate hypotheses for testing through the quantitative methods. That process requires operationalization to translate the concepts from the qualitative themes into quantitative variables. This article illustrates these procedures with examples that range from simple operationalization to the evaluation of complex models. It concludes with an argument for not only following up qualitative work with quantitative studies but also the reverse, and doing so by going beyond integrating methods within single projects to include broader mutual attention from qualitative and quantitative researchers who work in the same field. © The Author(s) 2015.

  1. Factors relating to participation in follow-up to the 45 and up study in Aboriginal and non-Aboriginal individuals

    Directory of Open Access Journals (Sweden)

    Lina Gubhaju

    2016-05-01

    Full Text Available Abstract Background This study aimed to characterise the factors relating to participation in a postal follow-up study in Aboriginal and non-Aboriginal individuals, given the need to quantify potential biases from loss to follow-up and the lack of evidence regarding postal surveys among Aboriginal people. Methods The first 100,000 participants from the Sax Institute’s 45 and Up Study, a large scale cohort study, were posted a follow-up questionnaire gathering general demographic, health and risk factor data, emphasising Social, Economic and Environmental Factors (“The SEEF Study”. For each variable of interest, percentages of those invited who went on to participate in follow-up were tabulated separately for Aboriginal and non-Aboriginal participants and age- and sex-adjusted participation rate ratios (aPRR were calculated. Results Of the 692 Aboriginal and 97,178 non-Aboriginal invitees to the study, 314 Aboriginal (45 % and 59,175 non-Aboriginal (61 % individuals responded. While Aboriginal people were less likely to respond than non-Aboriginal people (aPRR 0.72, 95 % CI 0.66–0.78, factors related to response were similar. Follow-up study participants were more likely than non-participants to have university versus no educational qualifications (1.6, 1.3–2.0 [Aboriginal]; 1.5, 1.5–1.5 [non-Aboriginal] and an annual income of ≥70,000 versus < $20,000 (1.6, 1.3–2.0; 1.2, 1.2–1.3 [χ 2 = 7.7; p = 0.001]. Current smokers (0.55, 0.42–0.72; 0.76, 0.74–0.77 [χ 2 = 7.14; p = 0.03], those reporting poor self-rated health (0.68, 0.47–0.99; 0.65, 0.61–0.69, poor quality of life (0.63, 0.41–0.97; 0.61, 0.57–0.66 and very high psychological distress (0.71, 0.68–0.75 [non-Aboriginal] were less likely than other cohort members to respond. Conclusions Relatively large numbers of Aboriginal and non-Aboriginal individuals participated in the first 45 and Up Study follow-up suggesting that postal surveys

  2. Outcomes using wedge stem with full hydroxiapatite coverage with a minimum of 5 years' follow-up.

    Science.gov (United States)

    Godoy-Monzon, D; Buttaro, M; Comba, F; Zanotti, G; Piccaluga, F; Neira-Borrajo, I

    Total Hip Arthroplsty (THA) using uncemented stems is a popular practice in the last decades. The implant survivorship is crtitical and a less than 10% revision at 10 years is been propesed for commercialization and use. To analyse the clinicoradiological results of an uncemented hydroxiapatite covered wedge stem with a 5 years minimum follow up. Prospective study, patients aged from 21-75years were included. All patients received an Element stem (Exactech) and uncemented cup with crosslink poly and 32 mm metal head, and posterior approach with piriformis retention was used. Scheduled clinical and radiographic evaluation at 3 weeks, 3-6 month, year and subsequent years using Harris Hip Score and Merle d'Aubigné Postel. Intraoperative and during follow up complications were recorded. One hundred and fourteen total hip replacements in 104 patients: 54 females and 50 males (52%/48%). Follow-up of 5.7 years (range, 5-6.2years). Average age 56.8years (range, 42-75years). Clinical evaluation the Merle d'Aubigné score improved 6.8 points and from the initianl Harris Hip Score 47.3 to 93.1 points at last follow up. Radiographic evaluation shows osteointegration in all stems. And in 6 cases (5.3% at 3 months subsidence was detected, average 1.4 mm (range 0-2.6 mm) with no clinical manifestation, 3 cases of subsidence were associated to intraoperative fractures (1 greater trochanter and 2 in the calcar area, all resolved with wire cerclaje). Subjective evaluation: 86 cases (82.6%) excellent, 9 patients (8.6%) good, 6 cases (5.9%) satisfactory and 3 cases (2.9%) poor. All poor results linked to the intraoperative complications. No patient lost during follow up period. No femoral pain dislocation or aseptic or loosening detected. All implants were in situ at last follow up. The radiological results confirm the benefits of this type of stem with good osteointegration. The clinical and subjective results are promising. With good surgical technical and without complications the

  3. Mortality in an extended follow-up of British coal workers

    International Nuclear Information System (INIS)

    MacCalman, L; Miller, B G

    2009-01-01

    The Pneumoconiosis Field Research (PFR) programme was established in the 1950s, to evaluate effects of coal mining exposures on the health and mortality of British coal workers. Surveys of working miners were carried out at 5-yearly intervals, initially in 24 collieries but later concentrating on 10, collecting detailed work histories and health information for each recruit. Here we report on cause-specific mortality in a cohort of almost 18,000 men from 10 British collieries, followed up for periods up to 47 years, yielding over 516,000 life-years of follow-up. External analyses compared cause-specific death rates in the cohort to those of the population of the regions in which the collieries were situated, using Standardised Mortality Ratios (SMRs). The causes investigated included lung cancer, stomach cancer, non-malignant respiratory disorders and cardiovascular disorders. SMRs showed evidence of an initial healthy worker effect diminishing over time. Several causes, including non-malignant respiratory disease and lung cancer, showed a significant deficit of mortality at the start of the study period with an excess in the latter part of the follow-up period. In these results, effects of working conditions are likely to be confounded with smoking habits. Overall, we believe our results may be generalised to the British coal industry since nationalisation.

  4. Relapse after methylprednisolone oral minipulse therapy in childhood vitiligo: A 12-month follow-up study

    Directory of Open Access Journals (Sweden)

    Imran Majid

    2013-01-01

    Full Text Available Background: Oral minipulse (OMP therapy with methylprednisolone is presently one of the most common oral treatments used for progressive vitiligo in children. The treatment is usually given for a period of 6 months during which majority of patients are reported to go into remission. However, there are no follow-up studies to comment upon what happens to the disease after OMP therapy is withdrawn. Aim of the study: To document the incidence of relapse over a period of 1 year after OMP therapy is stopped in children with vitiligo. Materials and Methods: The study was conducted in 180 patients of childhood vitiligo (<15 years of age who had been on OMP therapy with oral methylprednisolone for at least 6 months and who had achieved a complete remission of their disease during the treatment period. The enrolled patients were followed up for a period of 1 year and examined clinically for any sign of reactivation of their disease over either the old lesions or at any new area of the body. Results: Forty-two patients were lost and could not complete the follow-up period of 1 year. Out of the 138 patients available at the end of 1 year, relapse was observed in 48 patients (34.8%. Rest of 90 patients remained in remission over the follow-up period of 1 year. Relapse was more common in patients below 10 years of age (47.4% as compared with older children (25.9%. Conclusion: Relapse after using methylprednisolone OMP therapy in children with vitiligo is quite common especially in younger age groups. Studies are needed to see whether these relapses could be avoided by giving the treatment for a period longer than 6 months.

  5. 29 CFR 1956.64 - Location of plan for inspection and copying.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Location of plan for inspection and copying. 1956.64... PLANS New Jersey § 1956.64 Location of plan for inspection and copying. A copy of the plan may be inspected and copied during normal business hours at the following locations: Office of State Programs, U.S...

  6. The Status and Inspection of Bottom Mounted Instrumentation Nozzle in Korea

    International Nuclear Information System (INIS)

    Doh, Euisoon; Kim, Yoonwon; Kim, Jaeyoon; Lee, Tacksu; Lee, Changhun

    2012-01-01

    The PWSCC Cracking of Alloy 600 material has been issued since CRDM Penetration cracking of Bugey in France in 1990's. And J-groove weld cracking of CRDM at Oconee and PCR Nozzle cracking at Wolf Creek in USA were raising concern of the integrity for Dissimilar Metal Weld of Alloy 600. BMI(Bottom Mounted Instrumentation) Nozzle cracks were found at Takahama unit 1 in Japan and South Texas Project unit 1 in USA in 2003. And recent cracks of Reactor Head Vent line at Yonggwang unit 3 in Korea are enough to cause worry about the integrity for BMI Nozzles in Korea. BMI inspections of Westinghouse type plant were performed by KPS for Kori unit 1 in 2006, Ulchin unit 2 in 2007, and Kori unit 3 in 2008. The first inspection of OCR-1000 plant was carried out on May 2011 at Yonggwang unit 3. KPS developed the inspection technique of OCR-1000 plant for End Effector Module and controller, a quarterly actual sized Bottom head Mock up, Inspection probes meeting the regulatory guide lines and typical configuration of OCR-1000 plant. Two specimens with actual PWSCC cracks were used to demonstrate the Inspection technique of Detection and Sizing. and the quarterly actual sized Bottom head Mock up was very meaningful to check the Interference during the inspection by narrow gap between newly developments led to a successful inspection of the BMI Inspection. And the inspection was concurrently performed with 10 year Reactor Vessel ICI without hurting any critical path of the outage. This BMI inspection is contributing to keep Operational Safety of plants by prevention of Leakage at BMI nozzle and weld. And performing 10 Year ISI for BMI nozzle is very effective to prevent BMI nozzle Break by detecting PWSCC Initiation per PFM Sensitivity study

  7. Agile machining and inspection thrust area team-on-machine probing / compatibility assessment of Parametric Technology Corporation (PTC) pro/CMM DMIS with Zeiss DMISEngine.

    Energy Technology Data Exchange (ETDEWEB)

    Wade, James Rokwel; Tomlinson, Kurt; Bryce, Edwin Anthony

    2008-09-01

    The charter goal of the Agile Machining and Inspection Thrust Area Team is to identify technical requirements, within the nuclear weapons complex (NWC), for Agile Machining and Inspection capabilities. During FY 2008, the team identified Parametric Technology Corporation (PTC) Pro/CMM as a software tool for use in off-line programming of probing routines--used for measurement--for machining and turning centers. The probing routine would be used for in-process verification of part geometry. The same Pro/CMM program used on the machine tool could also be employed for program validation / part verification using a coordinate measuring machine (CMM). Funding was provided to determine the compatibility of the Pro/CMM probing program with CMM software (Zeiss DMISEngine).

  8. Clinical and ultrasound results after aortic valve replacement: intermediate-term follow-up with the St. Jude Medical prosthesis.

    Science.gov (United States)

    Montalescot, G; Thomas, D; Drobinski, G; Evans, J I; Vicaut, E; Chatellier, G; Whyte, R I; Busquet, P; Bejean-Lebuisson, A; Grosgogeat, Y

    1989-07-01

    Mortality, morbidity, quality of life, and left ventricular (LV) function were evaluated in 49 patients after aortic valve replacement with the St. Jude prosthesis. Total follow-up was 2577 patient-months; survivors were followed-up for 4 to 7 years by clinical examination and echocardiography. The actuarial survival rate at 6 years was 79.6%, and there were no valve-related deaths. The linearized rates for thromboembolism and hemorrhage were 0.93% and 3.26% per patient-year, respectively. In 34% of the survivors the quality of life was poor. In the first three postoperative months, patients with aortic stenosis (n = 12) had a significant decrease in the muscle cross-sectional area (p less than 0.01) and patients with aortic regurgitation (n = 11) had decreases in both LV end-diastolic diameter (p less than 0.05) and cross-sectional area (p less than 0.001). All of these results were maintained at 5 years without modification of LV systolic function. Despite the good overall results, six patients deteriorated and had major LV dilatation. Multivariate logistic regression analysis identified two independent preoperative variables associated with a poor outcome defined as death of LV dysfunction (p less than 0.05): age and end-diastolic diameter. Thus meticulous follow-up showed a high incidence of hemorrhage and a poor quality of life in many of the survivors. It was concluded that in high-risk patients (age and end-diastolic diameter) surgery should probably be considered earlier.

  9. Double-Shell Tank Visual Inspection Changes Resulting from the Tank 241-AY-102 Primary Tank Leak

    International Nuclear Information System (INIS)

    Girardot, Crystal L.; Washenfelder, Dennis J.; Johnson, Jeremy M.; Engeman, Jason K.

    2013-01-01

    As part of the Double-Shell Tank (DST) Integrity Program, remote visual inspections are utilized to perform qualitative in-service inspections of the DSTs in order to provide a general overview of the condition of the tanks. During routine visual inspections of tank 241-AY-102 (AY-102) in August 2012, anomalies were identified on the annulus floor which resulted in further evaluations. In October 2012, Washington River Protection Solutions, LLC determined that the primary tank of AY-102 was leaking. Following identification of the tank AY-102 probable leak cause, evaluations considered the adequacy of the existing annulus inspection frequency with respect to the circumstances of the tank AY-102 1eak and the advancing age of the DST structures. The evaluations concluded that the interval between annulus inspections should be shortened for all DSTs, and each annulus inspection should cover > 95 percent of annulus floor area, and the portion of the primary tank (i.e., dome, sidewall, lower knuckle, and insulating refractory) that is visible from the annulus inspection risers. In March 2013, enhanced visual inspections were performed for the six oldest tanks: 241-AY-101, 241-AZ-101,241-AZ-102, 241-SY-101, 241-SY-102, and 241-SY-103, and no evidence of leakage from the primary tank were observed. Prior to October 2012, the approach for conducting visual examinations of DSTs was to perform a video examination of each tank's interior and annulus regions approximately every five years (not to exceed seven years between inspections). Also, the annulus inspection only covered about 42 percent of the annulus floor

  10. Automated detection of follow-up appointments using text mining of discharge records.

    Science.gov (United States)

    Ruud, Kari L; Johnson, Matthew G; Liesinger, Juliette T; Grafft, Carrie A; Naessens, James M

    2010-06-01

    To determine whether text mining can accurately detect specific follow-up appointment criteria in free-text hospital discharge records. Cross-sectional study. Mayo Clinic Rochester hospitals. Inpatients discharged from general medicine services in 2006 (n = 6481). Textual hospital dismissal summaries were manually reviewed to determine whether the records contained specific follow-up appointment arrangement elements: date, time and either physician or location for an appointment. The data set was evaluated for the same criteria using SAS Text Miner software. The two assessments were compared to determine the accuracy of text mining for detecting records containing follow-up appointment arrangements. Agreement of text-mined appointment findings with gold standard (manual abstraction) including sensitivity, specificity, positive predictive and negative predictive values (PPV and NPV). About 55.2% (3576) of discharge records contained all criteria for follow-up appointment arrangements according to the manual review, 3.2% (113) of which were missed through text mining. Text mining incorrectly identified 3.7% (107) follow-up appointments that were not considered valid through manual review. Therefore, the text mining analysis concurred with the manual review in 96.6% of the appointment findings. Overall sensitivity and specificity were 96.8 and 96.3%, respectively; and PPV and NPV were 97.0 and 96.1%, respectively. of individual appointment criteria resulted in accuracy rates of 93.5% for date, 97.4% for time, 97.5% for physician and 82.9% for location. Text mining of unstructured hospital dismissal summaries can accurately detect documentation of follow-up appointment arrangement elements, thus saving considerable resources for performance assessment and quality-related research.

  11. Diffusion-weighted MR imaging in postoperative follow-up: Reliability for detection of recurrent cholesteatoma

    Energy Technology Data Exchange (ETDEWEB)

    Cimsit, Nuri Cagatay [Marmara University Hospital, Department of Radiology, Istanbul (Turkey); Engin Sitesi Peker Sokak No:1 D:13, 34330 Levent, Istanbul (Turkey)], E-mail: cagataycimsit@gmail.com; Cimsit, Canan [Goztepe Education and Research Hospital, Department of Radiology, Istanbul (Turkey); Istanbul Goztepe Egitim ve Arastirma Hastanesi, Radyoloji Klinigi, Goztepe, Istanbul (Turkey)], E-mail: ccimsit@ttmail.com; Baysal, Begumhan [Goztepe Education and Research Hospital, Department of Radiology, Istanbul (Turkey); Istanbul Goztepe Egitim ve Arastirma Hastanesi, Radyoloji Klinigi, Goztepe, Istanbul (Turkey)], E-mail: begumbaysal@yahoo.com; Ruhi, Ilteris Cagatay [Goztepe Education and Research Hospital, Department of ENT, Istanbul (Turkey); Istanbul Goztepe Egitim ve Arastirma Hastanesi, KBB Klinigi, Goztepe, Istanbul (Turkey)], E-mail: cruhi@yahoo.com; Ozbilgen, Suha [Goztepe Education and Research Hospital, Department of ENT, Istanbul (Turkey); Istanbul Goztepe Egitim ve Arastirma Hastanesi, KBB Klinigi, Goztepe, Istanbul (Turkey)], E-mail: sozbilgen@yahoo.com; Aksoy, Elif Ayanoglu [Acibadem Bakirkoy Hospital, Department of ENT, Istanbul (Turkey); Acibadem Hastanesi, KBB Boeluemue, Bakirkoey, Istanbul (Turkey)], E-mail: elifayanoglu@yahoo.com

    2010-04-15

    Introduction: Cholesteatoma is a progressively growing process that destroy the neighboring bony structures and treatment is surgical removal. Follow-up is important in the postoperative period, since further surgery is necessary if recurrence is present, but not if granulation tissue is detected. This study evaluates if diffusion-weighted MR imaging alone can be a reliable alternative to CT, without use of contrast agent for follow-up of postoperative patients in detecting recurrent cholesteatoma. Materials and methods: 26 consecutive patients with mastoidectomy reporting for routine follow-up CT after mastoidectomy were included in the study, if there was loss of middle ear aeration on CT examination. MR images were evaluated for loss of aeration and signal intensity changes on diffusion-weighted sequences. Surgical results were compared with imaging findings. Results: Interpretation of MR images were parallel with the loss of aeration detected on CT for all 26 patients. Of the 26 patients examined, 14 were not evaluated as recurrent cholesteatoma and verified with surgery (NPV: 100%). Twelve patients were diagnosed as recurrent cholesteatoma and 11 were surgically diagnosed as recurrent cholesteatoma (PPV: 91.7%). Four of these 11 patients had loss of aeration size greater than the high signal intensity area on DWI, which were surgically confirmed as granulation tissue or fibrosis accompanying recurrent cholesteatoma. Conclusion: Diffusion-weighted MR for suspected recurrent cholesteatoma is a valuable tool to cut costs and prevent unnecessary second-look surgeries. It has the potential to become the MR sequence of choice to differentiate recurrent cholesteatoma from other causes of loss of aeration in patients with mastoidectomy.

  12. The role of independent inspection in verification activities

    International Nuclear Information System (INIS)

    Fuerste, W.

    1982-01-01

    Independent inspection has its origin in the early Middle Ages, when kings prescribed to textile manufacturers a quality control by authorized inspectors. Independent inspection became more important with respect to the safety of workers in the industrial era beginning in the 18th century, when the high-pressure steam engines were introduced and many accidents and explosions of steam boilers occurred. Nowadays, independent inspection is of utmost importance, because the safety of the public is endangered by industrial plants located near highly populated areas. To better understand the role of independent inspection, the paper reviews its historical development in Europe from the Middle Ages to the 20th century. Most of the independent inspection associations in European countries were established after the second half of the 19th century and began with the surveillance of steam boilers. Nowadays, organizations like the TUEVs (Technical Inspection Agencies) in the Federal Republic of Germany perform expertise and inspection on behalf of the government in various fields of industrial safety. To show how independent inspection is involved in quality assurance, the methods practised in the United States of America and the Federal Republic of Germany are compared and future trends discussed. For developing countries starting with nuclear energy, it is important to consider the information and recommendations regarding independent inspection and its regulation as laid down in a number of publications in the IAEA NUSS Programme. (author)

  13. Importance of a Patient Dosimetry and Clinical Follow-up Program in the Detection of Radiodermatitis After Long Percutaneous Coronary Interventions

    International Nuclear Information System (INIS)

    Vano, Eliseo; Escaned, Javier; Vano-Galvan, Sergio; Fernandez, Jose M.; Galvan, Carmen

    2013-01-01

    Complex percutaneous interventions often require high radiation doses likely to produce skin radiation injuries. We assessed the methodology used to select patients with potential skin injuries in cardiac procedures and in need of clinical follow-up. We evaluated peak skin dose and clinical follow-up in a case of radiodermatitis produced during a total occlusion recanalization. This prospective study followed CIRSE and ACC/AHA/SCAI recommendations for patient radiation dose management in interventional procedures carried out in a university hospital with a workload of 4200 interventional cardiac procedures per year. Patient dose reports were automatically transferred to a central database. Patients exceeding trigger levels for air kerma area product (500 Gy cm 2 ) and cumulative skin dose (5 Gy) were counseled and underwent follow-up for early detection of skin injuries, with dermatologic support. The Ethical Committee and the Quality Assurance and Radiation Safety Committee approved the program. During 2010, a total of 13 patients (3.0/1,000 that year) received dose values exceeding trigger levels in the cardiovascular institute. Only one patient, who had undergone two consecutive procedures resulting in 970 Gy cm 2 and 13.0 Gy as cumulative skin dose, showed signs of serious radiodermatitis that resolved in 3.7 months. The remaining patients did not manifest skin lesions during follow-up, and whenever patient examination was not feasible as part of the follow-up, neither patients nor families reported any skin injuries. Peak skin dose calculation and close clinical follow-up were feasible and appropriate, with a moderate additional workload for the staff and satisfaction for the patient.

  14. Methodological guide for the follow-up and elaboration of performance assessments of a methanization plant

    International Nuclear Information System (INIS)

    Bastide, Guillaume

    2014-06-01

    This guide aims at giving indications required for a good implementation of an exploitation follow-up of a methanization plant. More precisely, it aims at foreseeing equipment necessary to the follow-up of installation construction, at preparing the operator to the follow-up and command of his installation, at elaborating operation assessments and performance interpretations, at proposing solutions and/or improvements. The described follow-up process can be applied to all the process stages (from receipt to by-product valorization), and addresses technical as well as economic aspects. Thus, four types of assessments are made: technical, energetic, environmental, and social-economic. This guide comprises five parts: a presentation of follow-up objectives (information to be looked for, benefits and drawbacks, follow-up level to be implemented), the follow-up methodology, follow-up assessments (what they are and how to elaborate them), practical sheets (practical presentation of techniques, typical Excel spreadsheets), and a glossary which explains the main technical terms

  15. Research and development of environment measuring laser radar. 6. Follow-up; Kankyo keisokuyo laser radar no kenkyu kaihatsu. 6. Follow up

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    In an effort to extend cooperation for reducing pollution in urban areas in the Asia-Pacific Region, a laser radar system was constructed in the city of Djakarta, Indonesia, in 1996, and a follow-up started in fiscal 1997. The aim is to collect information necessary for atmospheric environment improvement through observing pollutant distribution and movement in the upper atmospheric layers over the city. Mie-scattering lidar (laser infrared radar) observation has uninterruptedly been on since the summer of 1997, the system collecting data about Djakarta's atmospheric boundary structure throughout the year. The data indicate great changes in the atmospheric boundary structure between the dry and rainy seasons. The result of intensified observation conducted in the dry season shows that the altitude that the mixed layer reaches in the inland region is higher in the daytime and lower in the nighttime. It is necessary to compare the result with atmospheric pollution data collected on the ground surface and determine the relationship between the behavior of pollutants and the circulation of land-and-sea breeze. The data of September, 1997, reveal an aerosol layer at altitudes of 2km and higher, and this is attributed to forest fires. The result of intensified observation conducted in the dry season of 1998 is also stated. (NEDO)

  16. Factors Associated with Adherence to Follow-up Colposcopy

    Science.gov (United States)

    Fish, Laura J.; Moorman, Patricia G.; Wordlaw-Stintson, Lashawn; Vidal, Adriana; Smith, Jennifer S.; Hoyo, Cathrine

    2013-01-01

    Background: Understanding the gaps in knowledge about human papilloma virus (HPV) infection, transmission, and health consequences and factors associated with the knowledge gap is an essential first step for the development of interventions to improve adherence to follow-up among women with abnormal Pap smears. Purpose: To examine the relationship…

  17. Follow-up of conservatively treated sleep apnoea patients

    African Journals Online (AJOL)

    Health of School Children: Treatment of /ntestinal. Helminths and Schistosomiasis (WHO/GDS/IPI/GTD 92.1). Geneva: WHO, 1992. Accepted 17 June 1994. Follow-up of conservatively treated sleep apnoea patients. P. R. Bartel, J. Verster, P. J. Becker. Polysomnograms have been recorded at our laboratory since 1985 for ...

  18. Pathology Residents Comprise Inspection Team for a CAP Self-Inspection

    Directory of Open Access Journals (Sweden)

    Stacy G. Beal MD

    2017-03-01

    Full Text Available We report our experience at the University of Florida in which residents and fellows served as the inspection team for a College of American Pathologists (CAP self-inspection. We aimed to determine whether the CAP self-inspection could serve as a learning opportunity for pathology residents and fellows. To prepare for the inspection, we provided a series of 4 lunchtime seminars covering numerous laboratory management topics relating to inspections and laboratory quality. Preparation for the inspection began approximately 4 months prior to the date of the inspection. The intent was to simulate a CAP peer inspection, with the exception that the date was announced. The associate residency program director served as the team leader. All residents and fellows completed inspector training provided by CAP, and the team leader completed the team leader training. A 20 question pre- and posttest was administered; additionally, an anonymous survey was given after the inspection. The residents’ and fellows’ posttest scores were an average of 15% higher than on the pretest ( P < .01. The surveys as well as subjective comments were overwhelmingly positive. In conclusion, the resident’s and fellow’s experience as an inspector during a CAP self-inspection was a useful tool to learn accreditation and laboratory management.

  19. Conduct of inspections for plant modifications, event investigations and operability decisions. Proceedings of an International Workshop

    International Nuclear Information System (INIS)

    1995-01-01

    groups were established including, 2 for Plant Modifications, 3 on Event Investigation, and 1 on Operability Decisions. Each of these groups met 3 times during the Workshop, reviewing the issues. The Plant Modification groups discussed various topics regarding regulatory concerns such as; who should assess, what should be assessed, inspection guidelines, etc. The groups were able to reach a consensus in many areas and established a set of guidelines for each issue. The Event Investigation groups looked at such regulatory concerns as: reporting criteria, performing investigations, expertise required by the inspectors, follow-up actions, etc. Group discussions were not able to go into in-depth analysis, but considered the various issues and derived areas of consensus within the different countries. The Operability Decisions group was able to review the fundamental concepts involved with operability and look at many of the issues brought up by the participants. Conclusions were reached in the primary areas of interest including; operability determination, technical specifications, and maintenance and testing. The workshop has shown the extreme diversity of methods utilised throughout the world, which reveals a token of wealth and adaptability of nuclear inspection within the topics considered. As a result of the Workshop, a very comprehensive, structured and beneficial list of elements to be considered, was drawn for each topic. These lists can be utilised in order to develop and extend each issue for detailed work preparation. In spite of differences or organisation, structure, culture, economic situation, etc., all regulatory bodies represented at the Workshop, share a common understanding of the nuclear safety principles. It is inherently the utility or licensee who has responsibility for safety, but it is apparent that the regulatory body constitutes a de facto safety barrier. One important issue revealed during the Workshop, indicated that there is a prevalent need by

  20. Conduct of inspections for plant modifications, event investigations and operability decisions. Proceedings of an International Workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    groups were established including, 2 for Plant Modifications, 3 on Event Investigation, and 1 on Operability Decisions. Each of these groups met 3 times during the Workshop, reviewing the issues. The Plant Modification groups discussed various topics regarding regulatory concerns such as; who should assess, what should be assessed, inspection guidelines, etc. The groups were able to reach a consensus in many areas and established a set of guidelines for each issue. The Event Investigation groups looked at such regulatory concerns as: reporting criteria, performing investigations, expertise required by the inspectors, follow-up actions, etc. Group discussions were not able to go into in-depth analysis, but considered the various issues and derived areas of consensus within the different countries. The Operability Decisions group was able to review the fundamental concepts involved with operability and look at many of the issues brought up by the participants. Conclusions were reached in the primary areas of interest including; operability determination, technical specifications, and maintenance and testing. The workshop has shown the extreme diversity of methods utilised throughout the world, which reveals a token of wealth and adaptability of nuclear inspection within the topics considered. As a result of the Workshop, a very comprehensive, structured and beneficial list of elements to be considered, was drawn for each topic. These lists can be utilised in order to develop and extend each issue for detailed work preparation. In spite of differences or organisation, structure, culture, economic situation, etc., all regulatory bodies represented at the Workshop, share a common understanding of the nuclear safety principles. It is inherently the utility or licensee who has responsibility for safety, but it is apparent that the regulatory body constitutes a de facto safety barrier. One important issue revealed during the Workshop, indicated that there is a prevalent need by

  1. Follow up Evaluation of Air Force Blood Donors Screening Positive for Chagas Disease

    Science.gov (United States)

    2017-10-05

    59 MDW/SGVU SUBJECT: Professional Presentation Approval 31 JULY2017 Your paper, entitled Follow-up Evaluation of Air Force Blood Donors Screening...PUBLISHED OR PRESENTED: Follow-up Evaluation of Air Force Blood Donors Screening Positive for Chagas Disease 7. FUNDING RECEIVED FOR THIS STUDY? 0...PREVIOUS EDITIONS ARE OBSOLETE 50. DATE Page 3 of 3 Pages Follow-up Evaluation of Air Force Blood Donors Screening Positive for Chagas Disease

  2. Association of Cancer Incidence and Duration of Residence in Geothermal Heating Area in Iceland: An Extended Follow-Up.

    Directory of Open Access Journals (Sweden)

    Adalbjorg Kristbjornsdottir

    Full Text Available Residents of geothermal areas have higher incidence of non-Hodgkin's lymphoma, breast cancer, prostate cancer, and kidney cancers than others. These populations are exposed to chronic low-level ground gas emissions and various pollutants from geothermal water. The aim was to assess whether habitation in geothermal areas and utilisation of geothermal water is associated with risk of cancer according to duration of residence.The cohort obtained from the census 1981 was followed to the end of 2013. Personal identifier was used in record linkage with nation-wide emigration, death, and cancer registries. The exposed population, defined by community codes, was located on young bedrock and had utilised geothermal water supply systems since 1972. Two reference populations were located by community codes on older bedrock or had not utilised geothermal water supply systems for as long a period as had the exposed population. Adjusted hazard ratio (HR, 95% confidence intervals (CI non-stratified and stratified on cumulative years of residence were estimated in Cox-model.The HR for all cancer was 1.21 (95% CI 1.12-1.30 as compared with the first reference area. The HR for pancreatic cancer was 1.93 (1.22-3.06, breast cancer, 1.48 (1.23-1.80, prostate cancer 1.47 (1.22-1.77, kidney cancer 1.46 (1.03-2.05, lymphoid and haematopoietic tissue 1.54 (1.21-1.97, non-Hodgkin´s lymphoma 2.08 (1.38-3.15 and basal cell carcinoma of the skin 1.62 (1.35-1.94. Positive dose-response relationship was observed between incidence of cancers and duration of residence, and between incidence of cancer and degree of geothermal/volcanic activity in the comparison areas.The higher cancer incidence in geothermal areas than in reference areas is consistent with previous findings. As the dose-response relationships were positive between incidence of cancers and duration of residence, it is now more urgent than before to investigate the chemical and physical content of the geothermal

  3. Association of Cancer Incidence and Duration of Residence in Geothermal Heating Area in Iceland: An Extended Follow-Up.

    Science.gov (United States)

    Kristbjornsdottir, Adalbjorg; Aspelund, Thor; Rafnsson, Vilhjalmur

    2016-01-01

    Residents of geothermal areas have higher incidence of non-Hodgkin's lymphoma, breast cancer, prostate cancer, and kidney cancers than others. These populations are exposed to chronic low-level ground gas emissions and various pollutants from geothermal water. The aim was to assess whether habitation in geothermal areas and utilisation of geothermal water is associated with risk of cancer according to duration of residence. The cohort obtained from the census 1981 was followed to the end of 2013. Personal identifier was used in record linkage with nation-wide emigration, death, and cancer registries. The exposed population, defined by community codes, was located on young bedrock and had utilised geothermal water supply systems since 1972. Two reference populations were located by community codes on older bedrock or had not utilised geothermal water supply systems for as long a period as had the exposed population. Adjusted hazard ratio (HR), 95% confidence intervals (CI) non-stratified and stratified on cumulative years of residence were estimated in Cox-model. The HR for all cancer was 1.21 (95% CI 1.12-1.30) as compared with the first reference area. The HR for pancreatic cancer was 1.93 (1.22-3.06), breast cancer, 1.48 (1.23-1.80), prostate cancer 1.47 (1.22-1.77), kidney cancer 1.46 (1.03-2.05), lymphoid and haematopoietic tissue 1.54 (1.21-1.97), non-Hodgkin´s lymphoma 2.08 (1.38-3.15) and basal cell carcinoma of the skin 1.62 (1.35-1.94). Positive dose-response relationship was observed between incidence of cancers and duration of residence, and between incidence of cancer and degree of geothermal/volcanic activity in the comparison areas. The higher cancer incidence in geothermal areas than in reference areas is consistent with previous findings. As the dose-response relationships were positive between incidence of cancers and duration of residence, it is now more urgent than before to investigate the chemical and physical content of the geothermal water

  4. Contract Report for Usage Inspection of KN-12 Transport Cask

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J. C.; Seo, K. S.; Bang, K. S.; Cho, I. J.; Kim, D. H.; Min, D. K

    2007-03-15

    The usage inspection of the KN-12 spent nuclear fuel transport package was performed to receive the license for reuse. According to the Korea Atomic Energy Act, all type B transport package should receive and pass the usage inspection every five years. The KN-12 transport cask was designed to transport twelve spent PWR fuel assemblies under wet and dry conditions. The cask was developed and licensed in 2002 in accordance with the Korea and the IAEA's safe transport regulations. The areas of usage inspection include: visual inspection, nondestructive weld inspection, load test, maximum operating pressure test, leakage test, shielding test, thermal test, external surface contamination test. In the results of the usage inspection, the damage or defect could not found out and the performance of the cask was maintained according to the requirements of the regulation. Therefore, the usage inspection was successfully performed to acquire the license for the reuse.

  5. Integration of process-oriented control with systematic inspection in FRAMATOME-FBFC fuel manufacturing

    International Nuclear Information System (INIS)

    Kopff, G.

    2000-01-01

    process control method, with follow-up of process and product variables, combines the high reliability level obtained by systematic inspection with the continuous improvement approach authorised by process oriented control. (author)

  6. T171. REDUCED FRONTAL CORTICAL THICKNESS AND SURFACE IN A 10 YEARS FOLLOW-UP OF EARLY ONSET PSYCHOSIS

    Science.gov (United States)

    Ilzarbe, Daniel; de la Serna, Elena; Baeza, Inmaculada; Pariente, Jose; Fortea, Adriana; Redondo, Marina; Bargallo, Nuria; Castro-Fornieles, Josefina; Sugranyes, Gisela

    2018-01-01

    Abstract Background Structural volume loss of cortical gray matter over time in schizophrenia has been widely reported (Vita et al. 2012), and may be more pronounced when the disorder has an onset prior to age 18 (Early Onset Psychosis, EOP; Arango et al. 2008). More recently, studies have focused on measures of cortical morphology. The single study in EOP so far has identified greater loss of cortical thickness (CTH) in patients with schizophrenia over time (van Haren et al. 2011), whereas to our knowledge, no so far study has examined measures of surface area (SA) in EOP following a longitudinal design. We set out to examine measures of both CTH and SA in a sample of EOP at 10-year-follow-up. Methods Patients with EOP were recruited at first episode, matched by sex and age with healthy controls (HC) and re-assessed at 10 years. Subjects were evaluated clinically and structural T1 volumes were acquired using magnetic resonance imaging at baseline and 10-year-follow-up. Images were preprocessed, segmented and analysed with FreeSurfer. Quality control procedure was carried out by two raters. Images were segmented and CTH and SA values were extracted for each parcellation employing Desikan-Killiany Atlas; these were grouped in frontal, occipital, temporal, parietal and cingulate lobes so as to reduce multiple comparisons. When group or group by time effects were detected, parcellations were individually examined. A linear mixed model was built using Stata IC 13.1 to evaluate the effect of group and time on CTH and SA, including hemisphere as fixed effects and correcting by total intracranial volume and setting a critical p-value of .05. Results Thirty-nine subjects completed the follow-up. After removing 9 due to poor quality T1 images (technical problems, excess of movement), 28 subjects were finally included (13 EOP, 15 HC). There were no significant differences in age (EOP=26.9 ± 0.6 vs HC=27.2 ± 0.3 at follow-up) or sex distribution (%female: EOP=43% vs HC=38

  7. Radiographic follow-up study of Little Leaguer's shoulder

    Energy Technology Data Exchange (ETDEWEB)

    Kanematsu, Yoshiji; Iwase, Takenobu [Tokushima National Hospital, Department of Orthopaedic Surgery, Tokushima (Japan); Matsuura, Tetsuya; Suzue, Naoto; Sairyo, Koichi [University of Tokushima Graduate School, Department of Orthopedics, Institute of Health Bioscience, Tokushima (Japan); Kashiwaguchi, Shinji [Japan Community Health Care Organization, Tokyo Shinjuku Medical Center, Department of Orthopaedic Surgery, Tokyo (Japan); Iwame, Toshiyuki [Tokushima Prefectural Central Hospital, Department of Orthopaedic Surgery, Tokushima (Japan)

    2015-01-15

    Little Leaguer's shoulder is a syndrome involving the proximal humeral epiphyseal plate. Conservative treatment usually resolves the symptoms. However, there are no reports of a radiographic follow-up study of this disease. The purpose of this study was to show the radiographic healing process of Little Leaguer's shoulder. A total of 19 male baseball players diagnosed as having Little Leaguer's shoulder were retrospectively evaluated. The mean age at first presentation was 12.7 years. External rotation anteroposterior radiographs of the shoulder were taken. All patients were treated with rest from throwing, and no throwing was recommended until remodeling was confirmed. Follow-up radiographs were taken at 1-month intervals to assess healing. All patients were observed until healing was confirmed radiographically, after which they returned to baseball. The mean follow-up period was 8.5 months. In addition to radiography, patients were asked whether they had any symptoms and whether they had been able to return to baseball. At the first examination, radiographs showed a wider epiphyseal plate of the throwing side compared with the asymptomatic contralateral shoulder. Healing was observed in all cases. Healing occurred first along the medial side and was then extended laterally. The mean time required for healing was 4.7 months. All patients were able to return to playing baseball at their pre-injury level of play and were asymptomatic when examined at the final follow-up. The healing process of Little Leaguer's shoulder advanced from medial to lateral, and healing was achieved about 5 months after initial examination. (orig.)

  8. The depression in women in pregnancy and postpartum period: A follow-up study.

    Science.gov (United States)

    Kirkan, Tulay Sati; Aydin, Nazan; Yazici, Esra; Aslan, Puren Akcali; Acemoglu, Hamit; Daloglu, Ali Gokhan

    2015-06-01

    This was a follow-up study to determine postpartum depression (PPD) and its causes in a population previously evaluated in the first trimester of pregnancy. The study sample consisted of pregnant women who were evaluated in the first trimester and 360 women who were re-evaluated in the postpartum period. Detailed sociodemographic data were obtained from the women, and depression was assessed with the Edinburgh Postpartum Depression scale (EPDS) and Structured Clinical Interview for Diagnostic and Statistical Manual of Mental Disorders (DSM) Axis I Disorders (SCID-I). In this follow-up study, the prevalence of PPD was 35% (n = 126). A depressive disorder in the first trimester of pregnancy, previous mental disorder, somatic disorder, exposure to domestic violence during pregnancy, baby's staying in the incubator and not breastfeeding were predictors of PPD. Exposure to violence and a history of previous depression predicted depression both in pregnancy and in the postpartum period. Depression rates are high in Eastern Turkey. Exposure to violence during pregnancy and the existence of a previous mental disorder were risk factors for perinatal depression in this study. Performing screening tests can identify women at risk of pregnancy-related depression. Prevention programs should be established in areas where the prevalence of depression is high. © The Author(s) 2014.

  9. Getting the most from the sleeve: the importance of post-operative follow-up.

    Science.gov (United States)

    Keren, Dean; Matter, Ibrahim; Rainis, Tova; Lavy, Alexandra

    2011-12-01

    Bariatric approach to obesity provides substantial weight loss and comorbidity resolution. Our unique service includes pre- and postoperative visits to the Health and Nutrition Clinic headed by a specialist in gastroenterology and nutrition. We compared patients attending regular clinic routine with those who were lost to follow-up with regard to anthropometry, comorbidity, quality of life, and food tolerance and determined who benefited most from the operation. A retrospective review was performed on patients 30 months after undergoing sleeve gastrectomy. Body mass index was used to report weight loss. Bariatric Analysis and Reporting Outcome System (BAROS) and Food Tolerance Score were (FTS) completed by all patients at the 30-month follow-up visit and compared between two groups (group I-30 months of active postoperative follow-up; group II-without). A total of 119 patients participated in the study. For groups I and II, the mean percentage of excess BMI loss at 30 months was 82.08 ± 9.83 and 74.88 ± 8.75, respectively, with better comorbidity improvement in group I. BAROS scores were 7.62 ± 0.72 and 6.92 ± 0.92. FTS was 24.30 ± 2.09 and 22.55 ± 2.27, respectively. From our experience, getting the most from the sleeve is attributed to two main factors: surgery and nutrition. Surgery results in optimal restriction and improved satiety, whereas nutrition relies on a professional medical team providing constant, ongoing patient support throughout all the bariatric process stages. These teams of surgeons and gastroenterologists specializing in nutrition, working side by side, each in their area of specialty, are the main pillars leading to the success of the sleeve.

  10. Report of Radioisotope Inspection Technical Committee

    International Nuclear Information System (INIS)

    Otani, H.

    1980-01-01

    For the purpose of unifying the method of performance test for the routine management of the performance of RI equipments, the check-up of performance at the time of purchasing the equipments or research works, the Committee has continued the investigation on the method of performance test on RI equipments. Now, the definite plans have been decided regarding the method of performance test on radioisotope monitoring instruments and the measuring instruments for RI samples, therefore they are reported hereinafter. As for the radioisotope monitoring instruments, Curie meter, area monitor, water monitor, gas monitor and hand, foot and cloth monitor were taken up, and the items of inspection, the purposes, the testing methods, the expression of measured results and their evaluation were discussed. The accuracy of measurement of absolute radio-activity is important in Curie meter, the stability of continuous monitoring is important in general monitors, and the limit of measurement is important in the hand, foot and cloth monitor. As for the measuring instruments for radioactive materials, the efficiency of counting, linearity and stability were taken up as the items of performance test, and other matters to which attention should be paid were added. These were described, dividing into well type scintillation counter and liquid scintillation counter. (Kako, I.)

  11. Recovery From Anorexia Nervosa and Bulimia Nervosa at 22-Year Follow-Up.

    Science.gov (United States)

    Eddy, Kamryn T; Tabri, Nassim; Thomas, Jennifer J; Murray, Helen B; Keshaviah, Aparna; Hastings, Elizabeth; Edkins, Katherine; Krishna, Meera; Herzog, David B; Keel, Pamela K; Franko, Debra L

    2017-02-01

    The course of eating disorders is often protracted, with fewer than half of adults achieving recovery from anorexia nervosa or bulimia nervosa. Some argue for palliative management when duration exceeds a decade, yet outcomes beyond 20 years are rarely described. This study investigates early and long-term recovery in the Massachusetts General Hospital Longitudinal Study of Anorexia and Bulimia Nervosa. Females with DSM-III-R/DSM-IV anorexia nervosa or bulimia nervosa were assessed at 9 and at 20 to 25 years of follow-up (mean [SD] = 22.10 [1.10] years; study initiated in 1987, last follow-up conducted in 2013) via structured clinical interview (Longitudinal Interval Follow-Up Evaluation of Eating Disorders [LIFE-EAT-II]). Seventy-seven percent of the original cohort was re-interviewed, and multiple imputation was used to include all surviving participants from the original cohort (N = 228). Kaplan-Meier curves estimated recovery by 9-year follow-up, and McNemar test examined concordance between recovery at 9-year and 22-year follow-up. At 22-year follow-up, 62.8% of participants with anorexia nervosa and 68.2% of participants with bulimia nervosa recovered, compared to 31.4% of participants with anorexia nervosa and 68.2% of participants with bulimia nervosa by 9-year follow-up. Approximately half of those with anorexia nervosa who had not recovered by 9 years progressed to recovery at 22 years. Early recovery was associated with increased likelihood of long-term recovery in anorexia nervosa (odds ratio [OR] = 10.5; 95% CI, 3.77-29.28; McNemar χ²₁ = 31.39; P bulimia nervosa (OR = 1.0; 95% CI, 0.49-2.05; McNemar χ²₁ = 0; P = 1.0). At 22 years, approximately two-thirds of females with anorexia nervosa and bulimia nervosa were recovered. Recovery from bulimia nervosa happened earlier, but recovery from anorexia nervosa continued over the long term, arguing against the implementation of palliative care for most individuals with eating disorders. © Copyright

  12. 10 CFR 50.70 - Inspections.

    Science.gov (United States)

    2010-01-01

    ... rent-free office space for the exclusive use of the Commission inspection personnel. Heat, air... provided regular plant employees, following proper identification and compliance with applicable access..., is not announced or otherwise communicated by its employees or contractors to other persons at the...

  13. Retrospective Dosimetry and Clinical Follow-up Programme of Chernobyl Accident Clean-up Workers in Latvia

    International Nuclear Information System (INIS)

    Mironova-Ulmane, N.; Pavlenko, A.; Zvagule, T.; Karner, T.; Bruvere, R.; Volrate, A.

    2001-01-01

    Full text: About 6500 Latvian inhabitants were recruited for clean-up works at Chernobyl Nuclear Power Plant during 1986-1991. Absorbed doses for them are usually unknown, because only less then half of the clean-up workers cohort had officially documented external exposure. Clinical investigations show high morbidity rate of clean-up workers compared with general population. The results of Electronic Spin Resonance (ESR) dose reconstruction (doses absorbed in the tooth enamel) for the clean-up workers were always higher as documented of exposure doses of physical measurements. In many cases more than half of total absorbed dose is due to 90 Sr accumulated in teeth. Most of the clean-up workers have poli-symptomatic sicknesses that exhibit tendency to progress, and their morbidity exceeds that observed in general population. ESR dosimetry programs and clinical follow-up improved existing knowledge in the field of radiation medicine. These data will help to develop and apply the proper treatment and rehabilitation procedures for clean-up workers. (author)

  14. Bladder dysfunction in multiple sclerosis: a 6-year follow-up study.

    Science.gov (United States)

    Kisic Tepavcevic, Darija; Pekmezovic, Tatjana; Dujmovic Basuroski, Irena; Mesaros, Sarlota; Drulovic, Jelena

    2017-03-01

    Bladder dysfunction (BD) is the most common autonomic disturbance in multiple sclerosis, but often overlooked and undertreated. The purpose of this longitudinal study was to explore the changes in the frequency of BD symptoms in MS cohort after a period of 3 and 6 years of follow-up, as well as to investigate the correlations between the presence of BD symptoms and both clinical characteristics and the health-related quality of life (HRQoL) at each subsequent point of estimation. The study population comprises a cohort of 93 patients with MS (McDonald's criteria, 2001). At each time point (baseline, and at the 3- and 6-year follow-up) of estimation, Expanded Disability Status Scale, Hamilton Rating Scale for Depression, Fatigue Severity Scale, Szasz Sexual Functioning Scale and HRQoL (measured by MSQoL-54) were assessed. The proportion of patients with at least one symptom of BD significantly increased over time, for both men and women (from 48.1% at baseline to 51.9% after 3 years and to 71.4% after 6 years of follow-up for males and from 45.5% at baseline to 50.0% after 3 years and to 66.7% after 6 years of follow-up for females). The most common BD problem was urgency of urination. The presence of BD was statistically significantly associated with higher level of physical disability, sexual dysfunction and HRQoL at each point of follow-up, for both men and women. Our results suggested outstanding frequency of BD in patients with MS, with increasing tendency over time.

  15. Clinical follow-up of unilateral, fixed dental prosthesis on maxillary implants.

    Science.gov (United States)

    Wahlström, Monica; Sagulin, Gun-Britt; Jansson, Leif E

    2010-11-01

    The aims of the present study were to evaluate (1) the success rate of unilateral maxillary fixed dental prosthesis (FDPs) on implants in patients at a periodontal clinic referred for periodontal treatment, (2) the prevalence of varying mechanical and biological complications and (3) effects of potential risk factors on the success rate. Fifty consecutive patients were invited to participate in a follow-up. The patients had received FDPs on implants between November 2000 and December 2003 after treatment to achieve optimal peridontal health, and the FDPs had been in function for at least 3 years. A questionnaire was sent to the patients before the follow-up examination. Forty-six patients with 116 implants were examined. The follow-up comprised clinical and radiographic examinations and evaluations of treatment outcome. Before implant treatment, 13% of the teeth were extracted; of these, 80% were extracted due to periodontal disease. No implants had been lost before implant loading. One implant in one patient fractured after 3 years of functional loading and three implants in another patient after 6.5 years. The most frequent mechanical complications were veneer fractures and loose bridge screws. Patients with peri-implant mucositis had significantly more bleeding on probing around teeth and implants. Patients with peri-implantitis at the follow-up had more deep periodontal pockets around their remaining teeth compared with individuals without peri-implantitis, but these differences were not significant. Smokers had significantly fewer teeth, more periodontal pockets ≥ 4mm and a tendency towards greater marginal bone loss at the follow-up, compared with non-smokers. In the short term, overloading and bruxism seem more hazardous for implant treatment, compared with a history of periodontitis.

  16. 48 CFR 52.246-9 - Inspection of Research and Development (Short Form).

    Science.gov (United States)

    2010-10-01

    ... Clauses 52.246-9 Inspection of Research and Development (Short Form). As prescribed in 46.309, insert the following clause: Inspection of Research and Development (Short Form) (APR 1984) The Government has the... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Inspection of Research and...

  17. 48 CFR 52.246-7 - Inspection of Research and Development-Fixed-Price.

    Science.gov (United States)

    2010-10-01

    ... Clauses 52.246-7 Inspection of Research and Development—Fixed-Price. As prescribed in 46.307(a), insert the following clause: Inspection of Research and Development—Fixed-Price (AUG 1996) (a) The Contractor... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Inspection of Research and...

  18. THE PREEMPTION RIGHT REGARDING THE TRANSACTIONS OF AGRICULTURAL LANDS LOCATED OUTSIDE THE BUILT-UP AREAS

    Directory of Open Access Journals (Sweden)

    Simona Chirică

    2015-11-01

    Full Text Available The sale of agricultural lands located out-side the built-up areas has been recently limited through the obligation to follow the preemption procedure based on Law no. 17/2014, as subsequently amended (”Law 17”2 on the regulation measures for sale of agricultural lands located out-side the built-up areas and for the amendment of Law no. 268/2011 on the privatization of companies holding in administration public or private State owned agricultural lands and the establishment of the State Domains Agency. The preemptors are: (i the joint owners, (ii the lessees, (iii the neighboring owners, (iv Romanian State, through State Domain Agency. The preemption procedure commence with posting by the seller of its sale offer at the competent city hall and ends with the issuance of the positive/negative sale approval or, as the case may be, the conclusion of the sale agreement with one of the pre-emptors.

  19. Sexual dysfunction in multiple sclerosis: A 6-year follow-up study.

    Science.gov (United States)

    Kisic-Tepavcevic, Darija; Pekmezovic, Tatjana; Trajkovic, Goran; Stojsavljevic, Nebojsa; Dujmovic, Irena; Mesaros, Sarlota; Drulovic, Jelena

    2015-11-15

    Sexual dysfunction (SD) is a common but often overlooked and undertreated symptom in multiple sclerosis (MS). The purpose of our longitudinal study was to explore the changes in the level of sexual functioning in MS cohort after a period of 3 and 6 years of follow-up, as well as to investigate the predictors of changes in SD during the period of observation. The study population comprise a cohort of 93 patients with MS (McDonald's criteria, 2001) who were assessed at three time points during the study (baseline, and at the 3- and 6-year follow-up). The presence and severity of SD was quantified by Szasz sexual functioning scale. Independent predictors of the ordinal-scaled measure of sexual problems were identified using a generalized linear mixed regression models. The number of reported SD symptoms increased markedly for both genders during the whole period of observation. Duration of follow-up, age, level of physical disability, depression and fatigue were identified as independent prognostic factors for deterioration of sexual functioning in patients with MS during the 6-year follow-up. Our study provides insight into dynamics of change in sexual function among patients with MS and predictors of change, over the period of 6 years. Copyright © 2015 Elsevier B.V. All rights reserved.

  20. Patient Satisfaction With an Early Smartphone-Based Cosmetic Surgery Postoperative Follow-Up.

    Science.gov (United States)

    Pozza, Edoardo Dalla; D'Souza, Gehaan F; DeLeonibus, Anthony; Fabiani, Brianna; Gharb, Bahar Bassiri; Zins, James E

    2017-12-13

    While prevalent in everyday life, smartphones are also finding increasing use as a medical care adjunct. The use of smartphone technology as a postoperative cosmetic surgery adjunct for care has received little attention in the literature. The purpose of this effort was to assess the potential efficacy of a smartphone-based cosmetic surgery early postoperative follow-up program. Specifically, could smartphone photography provided by the patient to the plastic surgeon in the first few days after surgery allay patient's concerns, improve the postoperative experience and, possibly, detect early complications? From August 2015 to March 2016 a smartphone-based postoperative protocol was established for patients undergoing cosmetic procedures. At the time of discharge, the plastic surgeon sent a text to the patient with instructions for the patient to forward a postoperative photograph of the operated area within 48 to 72 hours. The plastic surgeon then made a return call/text that same day to review the patient's progress. A postoperative questionnaire evaluated the patients' postoperative experience and satisfaction with the program. A total of 57 patients were included in the study. Fifty-two patients responded to the survey. A total of 50 (96.2%) patients reported that the process improved the quality of their postoperative experience. The protocol allowed to detect early complications in 3 cases. The physician was able to address and treat the complications the following day prior to the scheduled clinic follow up. The smartphone can be effectively utilized by the surgeon to both enhance the patient's postoperative experience and alert the surgeon to early postoperative problems. 4. © 2017 The American Society for Aesthetic Plastic Surgery, Inc. Reprints and permission: journals.permissions@oup.com