  1. Yampa River Valley sub-area contingency plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    The Yampa River Valley sub-area contingency plan (Contingency Plan) has been prepared for two counties in northwestern Colorado: Moffat County and Routt County. The Contingency Plan is provided in two parts, the Contingency Plan and the Emergency Response Action Plan (ERAP). The Contingency Plan provides information that should be helpful in planning to minimize the impact of an oil spill or hazardous material incident. It contains discussions of planning and response role, hazards identification, vulnerability analysis, risk analysis, cleanup, cost recovery, training, and health and safety. It includes information on the incident command system, notifications, response capabilities, emergency response organizations, evacuation and shelter-in-place, and immediate actions.

  2. Hanford Facility contingency plan

    International Nuclear Information System (INIS)

    Sutton, L.N.; Miskho, A.G.; Brunke, R.C.

    1993-10-01

    The Hanford Facility Contingency Plan, together with each TSD unit-specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. This plan includes descriptions of responses to a nonradiological hazardous materials spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. This plan includes descriptions of responses for spills or releases as a result of transportation activities, movement of materials, packaging, and storage of hazardous materials

  3. Contingency planning: preparation of contingency plans

    DEFF Research Database (Denmark)

    Westergaard, J M

    2008-01-01

    . The risk of introducing disease pathogens into a country and the spread of the agent within a country depends on a number of factors including import controls, movement of animals and animal products and the biosecurity applied by livestock producers. An adequate contingency plan is an important instrument...... in the preparation for and the handling of an epidemic. The legislation of the European Union requires that all Member States draw up a contingency plan which specifies the national measures required to maintain a high level of awareness and preparedness and is to be implemented in the event of disease outbreak...

  4. Licensee safeguards contingency plans

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The Nuclear Regulatory Commission is amending its regulations to require that licensees authorized to operate a nuclear reactor (other than certain research and test reactors), and those authorized to possess strategic quantities of plutonium, uranium-233, or uranium-235 develop and implement acceptable plans for responding to threats, thefts, and industrial sabotage of licensed nuclear materials and facilities. The plans will provide a structured, orderly, and timely response to safeguards contingencies and will be an important segment of NRC's contingency planning programs. Licensee safeguards contingency plans will result in organizing licensee's safeguards resources in such a way that, in the unlikely event of a safeguards contingency, the responding participants will be identified, their several responsibilities specified, and their responses coordinated

  5. Appendix F - Sample Contingency Plan

    Science.gov (United States)

    This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).

  6. 30 CFR 282.26 - Contingency Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Contingency Plan. 282.26 Section 282.26 Mineral... § 282.26 Contingency Plan. (a) When required by the Director, a lessee shall include a Contingency Plan as part of its request for approval of a Delineation, Testing, or Mining Plan. The Contingency Plan...

  7. National Contingency Plan Subpart J

    Science.gov (United States)

    Subpart J of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating devices and substances that may be used to remove or control oil discharges.

  8. 49 CFR 1544.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1544.301 Section 1544.301... COMMERCIAL OPERATORS Threat and Threat Response § 1544.301 Contingency plan. Each aircraft operator must adopt a contingency plan and must: (a) Implement its contingency plan when directed by TSA. (b) Ensure...

  9. 300 Area Process Trenches Supplemental Information to the Hanford Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    R.A. Carlson

    1997-01-01

    The 300 Area Process Trenches are surface impoundments which were used to receive routine discharges of nonregulated process cooling water from operations in the 300 Area and dangerous waste from several research and development laboratories and the 300 Area Fuels Fabrication process. Discharges to the trenches ceased in 1994, and they were physically isolated in 1995. Remediation of the trenches is scheduled to begin during July 1997. Currently, there are no waste management activities required at the 300 Area Process Trenches and the unit does not present any significant hazards to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 300 Area Process Trenches, however, during remediation, exposure, spill, fire, and industrial hazards will exist. This contingency plan addresses the emergency organization, equipment and evacuation routes pertinent to the process trenches during remediation

  10. Developing standardized facility contingency plans

    International Nuclear Information System (INIS)

    Davidson, D.A.

    1993-01-01

    Texaco consists of several operating departments that are, in effect, independent companies. Each of these departments is responsible for complying with all environmental laws and regulations. This includes the preparation by each facility to respond to an oil spill at that location. For larger spills, however, management of the response will rest with corporate regional response teams. Personnel from all departments make up the regional teams. In 1990, Congress passed the Oil Pollution Act. In 1991, the US Coast Guard began developing oil spill response contingency plan regulations, which they are still working on. Meanwhile, four of the five west coast states have also passed laws requiring contingency plans. (Only Hawaii has chosen to wait and see what the federal regulations will entail). Three of the states have already adopted regulations. Given these laws and regulations, along with its corporate structure, Texaco addressed the need to standardize local facility plans as well as its response organization. This paper discusses how, by working together, the Texaco corporate international oil spill response staff and the Texaco western region on-scene commander developed: A standard contingency plan format crossing corporate boundaries and meeting federal and state requirements. A response organization applicable to any size facility or spill. A strategy to sell the standard contingency plan and response organization to the operating units

  11. 40 CFR 300.210 - Federal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... contingency plans under the national response system: The National Contingency Plan, RCPs, and ACPs. These... discharge under § 300.324, and to mitigate or prevent a substantial threat of such a discharge, from a vessel, offshore facility, or onshore facility operating in or near the area. (2) The areas of...

  12. 49 CFR 1542.301 - Contingency plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contingency plan. 1542.301 Section 1542.301..., DEPARTMENT OF HOMELAND SECURITY CIVIL AVIATION SECURITY AIRPORT SECURITY Contingency Measures § 1542.301 Contingency plan. (a) Each airport operator required to have a security program under § 1542.103(a) and (b...

  13. Network location theory and contingency planning

    Energy Technology Data Exchange (ETDEWEB)

    Hakimi, S L

    1983-08-01

    A brief survey of results in network location theory is first presented. Then, a systems view of contingency planning is described. Finally, some results in location theory are re-examined and it is shown that they are motivated by contingency planning considerations. Some new issues and problems in location theory are described, which, if properly tackled, will have a substantial impact on contingency planning in transportation.

  14. 40 CFR 264.53 - Copies of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 264.53... Contingency Plan and Emergency Procedures § 264.53 Copies of contingency plan. A copy of the contingency plan... called upon to provide emergency services. [Comment: The contingency plan must be submitted to the...

  15. Detailed oil spill contingency analysis in establishment of preparedness plans for exploration drilling in environmentally sensitive areas: an integrated management process

    Energy Technology Data Exchange (ETDEWEB)

    Spikkerud, Cathrine S.; Skeie, Geir Morten; Brude, Odd Willy; Gravir, Gjermund [DNV Managing Risk, Oslo (Norway)

    2008-07-01

    This paper describes the integrated management process leading up to a dynamic oil spill preparedness plan based on detailed analysis of oil spill contingency requirements and environmental risk in environmentally sensitive areas. Starting with a detailed environmental risk and oil spill contingency analysis, oil spill preparedness plans are developed. These plans are generic for the area possibly affected by an oil spill, and are developed in detail for environmental 'hot spots' that are highly challenging in terms of oil spill response. The detailed plans make use of detailed data sets on shoreline substrate sensitivities and cleanup methodology, photographic inventory, logistical issues and access to real-time incident data for important areas. This detailed approach ensures sufficient knowledge about the sensitive area in advance to provide fast and correct strategic and tactical operational recovery decisions. A final element of the integrated process is a web based GIS, providing all parties involved with one common situation overview, ensuring that the facts remain in focus throughout the operation and that those responsible for informing stake-holders have access to correct and timely updated information. (author)

  16. 40 CFR 265.53 - Copies of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Copies of contingency plan. 265.53... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.53 Copies of contingency plan. A copy of the contingency plan and all revisions to the plan must be: (a) Maintained at the facility; and (b...

  17. 40 CFR 265.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 265.54... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.54 Amendment of contingency plan. The contingency plan must be reviewed, and immediately amended, if necessary, whenever: (a) Applicable regulations...

  18. 40 CFR 264.54 - Amendment of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Amendment of contingency plan. 264.54 Section 264.54 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Contingency Plan and Emergency Procedures § 264.54 Amendment of contingency plan. The contingency plan must be...

  19. 78 FR 53113 - Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency...

    Science.gov (United States)

    2013-08-28

    ...] Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency Measures for... California to address Clean Air Act nonattainment area contingency measure requirements for the 1997 annual... Air Act Requirements for Contingency Measures III. Review of the Submitted San Joaquin Valley PM 2.5...

  20. 40 CFR 264.227 - Emergency repairs; contingency plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Emergency repairs; contingency plans... FACILITIES Surface Impoundments § 264.227 Emergency repairs; contingency plans. (a) A surface impoundment... days after detecting the problem. (c) As part of the contingency plan required in subpart D of this...

  1. 10 CFR 72.184 - Safeguards contingency plan.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Safeguards contingency plan. 72.184 Section 72.184 Energy... Protection § 72.184 Safeguards contingency plan. (a) The requirements of the licensee's safeguards contingency plan for responding to threats and radiological sabotage must be as defined in appendix C to part...

  2. Environmental aspects of contingency planning and spill response

    International Nuclear Information System (INIS)

    Hillman, S.O.

    1993-01-01

    Alyeska Pipeline Service Company has implemented an incident command system (ICS) for crisis management within the company for response to spills at all company facilities including the Valdez Marine Terminal. The system is also used by Alyeska acting as the initial response contractor for TAPS laden tankers within Prince William Sound. During the past three years, Alyeska has undertaken a complete review of the spill prevention and response plans for these areas. This poster session focuses on the environmental aspects of the response planning efforts. Information is available on contingency planning updates in the areas of dispersant use, burning as a response tool, bioremediation of marine oil spills, waste management, permitting, coastal resource and sensitive habitat data base, and wildlife protection and management. All of these subjects are addressed in the resource documents (RD) supplementing the contingency plans. The RD revisions have been a coordinated effort, involving operators, agencies, and the public through the citizen advisory group

  3. Radiological Contingency Planning for the Mars Science Laboratory Launch

    Energy Technology Data Exchange (ETDEWEB)

    Paul P. Guss

    2008-04-01

    This paper describes the contingency planning for the launch of the Mars Science Laboratory scheduled for the 21-day window beginning on September 15, 2009. National Security Technologies, LLC (NSTec), based in Las Vegas, Nevada, will support the U.S. Department of Energy (DOE) in its role for managing the overall radiological contingency planning support effort. This paper will focus on new technologies that NSTec’s Remote Sensing Laboratory (RSL) is developing to enhance the overall response capability that would be required for a highly unlikely anomaly. This paper presents recent advances in collecting and collating data transmitted from deployed teams and sensors. RSL is responsible to prepare the contingency planning for a range of areas from monitoring and assessment, sample collection and control, contaminated material release criteria, data management, reporting, recording, and even communications. The tools RSL has available to support these efforts will be reported. The data platform RSL will provide shall also be compatible with integration of assets and field data acquired with other DOE, National Space and Aeronautics and Space Administration (NASA), state, and local resources, personnel, and equipment. This paper also outlines the organizational structure for response elements in radiological contingency planning.

  4. Volcanic Eruption: Students Develop a Contingency Plan

    Science.gov (United States)

    Meisinger, Philipp; Wittlich, Christian

    2013-04-01

    , causing a blockage and afflux of the Rhine, which, due to the given conditions of a very narrow valley, would lead to excessive flooding affecting even the greater Rhine-Main-region. Not to mention the consequences of a pyroclastic flow, dropping volcanic bombs and further hazardous/disastrous consequences. In comparison to other "potentially active" or "active volcanoes", e.g. the Vesuvius, the Laacher See is scarcely monitored and according to recent publications poorly analyzed in terms of contingency and evacuation plans. This offers space for critical analysis and creative solutions to an existing problem. Short: We need geographers and their knowledge to provide help. Given these facts, the Laacher See could be the layout for a very interesting geography project bringing together previously gained knowledge and understanding of volcanic activities, their destructive powers, consequences and risks in case of an eruption in combination with their topographical characteristics. Your students thereby act the role of a geoscientist developing contingency plans and evacuation zones for the greater Laacher See area. This involves a detailed analysis of the topographical characteristics based on (classic) topographic maps or online via the use of a GIS (e.g. Google maps). In a second step students enlist the possible consequences they already know according to their range and copy them onto a transparency layer on the topographic map. Using such a layer technique students add population density, important topographic features and maybe even anticipated wind directions to their map. The information density and the specific layout of this map are thereby only determined by the student's previous knowledge, their personal abilities and skills and the amount of time provided. This offers the opportunities to even differentiate the task within your group and provide support adjusted to the individual students level. On the basis of their own thematic map your students should be

  5. Contingency planning in southern Africa: Events rather than processes?

    OpenAIRE

    Elias Mabaso; Siambabala B. Manyena

    2013-01-01

    With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork ...

  6. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 264.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The contingency...

  7. Contingency planning in southern Africa: Events rather than processes?

    Directory of Open Access Journals (Sweden)

    Elias Mabaso

    2013-09-01

    Full Text Available With the increasing frequency, magnitude and impact of disasters, there is growing focus on contingency planning as a tool for enhancing resilience. Yet, there is little empirical evidence that reflects on the practice of contingency planning systems within the context of disaster risk reduction. This article explores the practice of contingency planning in southern Africa, focussing on Malawi, Mozambique, Namibia, Zambia and Zimbabwe. A qualitative comparative analysis informed by fieldwork was used. The findings show that (1 there was a wide gap between theory and practice in contingency planning, (2 response activities rarely reflected projected scenarios and (3 resources were inadequate for effective contingency planning. We conclude that unless these issues are addressed, contingency planning is likely to remain a theoretical rather than a practical tool for building disaster-resilient communities in southern African countries. Although a generalisation cannot be made on the status of contingency planning and practice in southern Africa without a wider analysis of more examples, the findings may apply beyond the examined contexts and also offer insights into research gaps.

  8. Model for negotiation on contingency plans for distribution of natural gas; Modelo de negociacao para planos de contingencia energetica na area de gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Sobral, Marcos Felipe Falcao; Morais, Danielle Costa [Universidade Federal de Pernambuco (UFPE), Recife, PE (Brazil)

    2008-07-01

    The high consumption of Natural Gas (NG), the environmental and economic turbulences that occurred in recent years raises questions about the supply of the product in critical situations. Characteristic factors of natural gas, like the high cost of storage, show the need for the establishment of contingency plans that define what procedures should be adopted in the distribution of Natural Gas or redistribute among consumers in times of restriction of supply, substantial increase on demand or reduction in the ability of supply. These plans aim to define in advance the actions that will be adopted, providing business and consumer segments clear rules indicate the time to search for alternative sources in case of crisis. The current models can not yet address the problem of negotiation for the division of the product following the concepts proposed by the science of trading, making things like proportionality and envy-free are not observed. The aim of this study is to propose a model for distribution of quotas for supply of NG between different consumer segments. The proposed algorithm combines the procedures of Knaster, Steinhaus and Divide the Dollar, seeking an allocation that minimize the feeling of jealousy and provide an equitable distribution. (author)

  9. National Contingency Plan (NCP) Subpart J Product Schedule Fact Sheet

    Science.gov (United States)

    This section of the National Oil and Hazardous Substances Pollution Contingency Plan stipulates the criteria for listing and managing the use of dispersants and other chemical and biological agents used to mitigate oil spills.

  10. National contingency plan product schedule data base

    International Nuclear Information System (INIS)

    Putukian, J.; Hiltabrand, R.R.

    1993-01-01

    During oil spills there are always proposals by the technical community and industry to use chemical agents to help in oil spill cleanups. Federal Clean Water Act regulations require that any chemical agents that the federal on-scene coordinator (FOSC) wants to use for oil cleanup be listed on the US Environmental Protection Agency (EPA) National Contingency Plan (NCP) Product Schedule. Chemical countermeasures are among the most controversial, complex, and time-critical issues facing decision-making officials choosing response methods to use on coastal oil spills. There are situations in which dispersants are likely to be one of the most appropriate counter-measure strategies. Dispersants are most effective when applied to fresh oil, and their effectiveness dramatically decreases as the oil weathers, which can begin in as little as 24 hours. To logistically implement dispersant use, a decision would need to be made within roughly the first 4 hours after the release. Most of the information that the FOSC needs to make the determination to use a specific chemical agent exists in manuals, EPA bulletins, and the published literature. This information is not in an easy-to-use format under field emergency conditions. Hence the need to collect and disseminate the information in an automated data base. The sources for the information in this data base are the following. Published results of tests performed by Environment Canada; EPA bulletins associated with the NCP Product Schedule; Published results of tests by the chemical industry. The data base resides on a Macintosh computer and contains information about 70 NCP products, including dispersants, surface collecting agents, and biological additives. It contains information on physical properties, toxicity, heavy metal content, safety precautions, use conditions, etc

  11. 40 CFR 267.54 - When must I amend the contingency plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false When must I amend the contingency plan... STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.54 When must I amend the contingency plan? You must review, and immediately amend the contingency plan, if necessary, whenever: (a) The facility...

  12. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., STORAGE, AND DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The...

  13. Dengue Contingency Planning: From Research to Policy and Practice

    Science.gov (United States)

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J.; Sánchez Tejeda, Gustavo; Lloyd, Linda S.; Hakim, Lokman; Bowman, Leigh R.; Horstick, Olaf; Coelho, Giovanini

    2016-01-01

    Background Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Methodology/Principal findings Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Conclusions/Significance Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak

  14. Public education programme for nuclear contingency planning in Hong Kong

    International Nuclear Information System (INIS)

    Wong, M. C.; Li, S. W.

    2002-01-01

    Two nuclear power stations on the coast of southern China are situated some 50 kilometers to the northeast of Hong Kong. Although the stations are far away from Hong Kong, the construction and operation of the nuclear power stations have generated public anxiety locally, in particular, after the Chernobyl accident in 1986. A comprehensive contingency plan which takes into account such concerns of the public has been implemented in Hong Kong. Cooperation by the public is vital to the effective implementation of any contingency plan. Understanding of the basics of radiation protection as well as the contingency plan will help the public to appreciate the situation and react in a rational manner. A public education program to promote awareness of the contingency plan has been implemented in Hong Kong. In particular, a Virtual Exhibition Hall on radiation has been developed and launched in February 2002 for access by the public via Internet. A video and a set of web pages will be launched in the later part of 2002 to inform and educate the public on matters related to nuclear accident response in Hong Kong. This paper describes the public education programme in Hong Kong to promote public awareness and understanding of the nuclear contingency plan

  15. Environmental surveillance: An integral part of the spill contingency plan

    International Nuclear Information System (INIS)

    Salinas, J.; Bozzo, W.

    1993-01-01

    Typically, the initial response to spills is directed at containing, controlling, and stopping the flow of spilled materials. The primary goal of such a response is to limit the spread and further impact of spilled material, and to initiate timely cleanup and recovery of affected areas. Surveillance of actual spill impacts has often followed an after the fact approach, using only immediately available resources. Surveillance may occur quickly after a spill, but in most incidents its occurs as a follow-up action after initial response and containment have been achieved. Insufficient planning may produce spill surveillance that inadequately assesses impacts, fails to incorporate baseline data, and does not clearly identify a cleanup recovery and endpoint. The management and operations contractor for the US Dept. of Energy's Strategic Petroleum Reserve (SPR) conducts environmental surveillance activities in response to spill incidents when they occur at these facilities. These surveillance activities, when conducted as part of the response, are useful instruments in the initial assessment of spill incidents, management of spill response, containment, and cleanup activities, and for monitoring and documenting postspill impacts and recovery. An Environmental Surveillance Plan (ESP) incorporated in the SPR Spill Contingency Plan provides for initiation of environmental surveillance as part of the spill response. The ESP outlines, through alogic tree, conditions for activating the plan, key indicator parameters for evaluation, detailed methods for establishing surveillance stations, lists of key personnel, locations of equipment necessary to perform surveillance, and conditions for termination of environmental surveillance

  16. Implications of Contingency Planning Support for Weather and Icing Information

    Science.gov (United States)

    Vigeant-Langlois, Laurence; Hansman, R. John, Jr.

    2003-01-01

    A human-centered systems analysis was applied to the adverse aircraft weather encounter problem in order to identify desirable functions of weather and icing information. The importance of contingency planning was identified as emerging from a system safety design methodology as well as from results of other aviation decision-making studies. The relationship between contingency planning support and information on regions clear of adverse weather was investigated in a scenario- based analysis. A rapid prototype example of the key elements in the depiction of icing conditions was developed in a case study, and the implications for the components of the icing information system were articulated.

  17. Genesis Contingency Planning and Mishap Recovery: The Sample Curation View

    Science.gov (United States)

    Stansbery, E. K.; Allton, J. H.; Allen, C. C.; McNamara, K. M.; Calaway, M.; Rodriques, M. C.

    2007-01-01

    Planning for sample preservation and curation was part of mission design from the beginning. One of the scientific objectives for Genesis included collecting samples of three regimes of the solar wind in addition to collecting bulk solar wind during the mission. Collectors were fabricated in different thicknesses for each regime of the solar wind and attached to separate frames exposed to the solar wind during specific periods of solar activity associated with each regime. The original plan to determine the solar regime sampled for specific collectors was to identify to which frame the collector was attached. However, the collectors were dislodged during the hard landing making identification by frame attachment impossible. Because regimes were also identified by thickness of the collector, the regime sampled is identified by measuring fragment thickness. A variety of collector materials and thin films applied to substrates were selected and qualified for flight. This diversity provided elemental measurement in more than one material, mitigating effects of diffusion rates and/or radiation damage. It also mitigated against different material and substrate strengths resulting in differing effects of the hard landing. For example, silicon crystal substrates broke into smaller fragments than sapphire-based substrates and diamond surfaces were more resilient to flying debris damage than gold. The primary responsibility of the curation team for recovery was process documentation. Contingency planning for the recovery phase expanded this responsibility to include not only equipment to document, but also gather, contain and identify samples from the landing area and the recovered spacecraft. The team developed contingency plans for various scenarios as part of mission planning that included topographic maps to aid in site recovery and identification of different modes of transport and purge capability depending on damage. A clean tent, set-up at Utah Test & Training Range

  18. 40 CFR 267.53 - Who must have copies of the contingency plan?

    Science.gov (United States)

    2010-07-01

    ... contingency plan? 267.53 Section 267.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.53 Who must have copies of the contingency plan? (a) You must maintain a copy of the plan with all revisions at the facility; and...

  19. 77 FR 76815 - Handling of Animals; Contingency Plans

    Science.gov (United States)

    2012-12-31

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service 9 CFR Parts 2 and 3 [Docket No. APHIS-2006-0159] RIN 0579-AC69 Handling of Animals; Contingency Plans AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Final rule. SUMMARY: We are amending the Animal Welfare Act...

  20. The Chalk River Nuclear Laboratories contingency plan -a brief description

    International Nuclear Information System (INIS)

    White, J.M.

    1982-01-01

    A brief description of the contingency plan which deals with both the on-site and off-site consequences of a serious nuclear accident is given. The off-site consequences of different size releases and the subsequent action taken by employees, radiation protection experts, municipal, Provincial and Federal authorities is described and the interaction of the various groups is discussed. (author)

  1. Unit-Specific Contingency Plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-04-01

    This document is a supplement to DOE/RL-93-75, 'Hanford Contingency Plan.' It provides the unit-specific information needed to fully comply with the Washington Administrative Code. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins were four concrete internal surfaces, which contained radiologically and hazardous contaminated waste. The 183-H Basin area is a final status treatment, storage, and disposal unit undergoing Resource Conservation and Recovery Act modified post- closure care

  2. Proposed energy conservation contingency plan: emergency restrictions on advertising lighting. Authorities, need, rationale, and operation

    Energy Technology Data Exchange (ETDEWEB)

    1977-04-01

    The emergency restrictions on advertising lighting proposed in Energy Conservation Contingency Plan No. 5 of 1977 are presented. A statement is given on the need for rationale and operation of the Contingency Plan.

  3. Robustness via Run-Time Adaptation of Contingent Plans

    Science.gov (United States)

    Bresina, John L.; Washington, Richard; Norvig, Peter (Technical Monitor)

    2000-01-01

    In this paper, we discuss our approach to making the behavior of planetary rovers more robust for the purpose of increased productivity. Due to the inherent uncertainty in rover exploration, the traditional approach to rover control is conservative, limiting the autonomous operation of the rover and sacrificing performance for safety. Our objective is to increase the science productivity possible within a single uplink by allowing the rover's behavior to be specified with flexible, contingent plans and by employing dynamic plan adaptation during execution. We have deployed a system exhibiting flexible, contingent execution; this paper concentrates on our ongoing efforts on plan adaptation, Plans can be revised in two ways: plan steps may be deleted, with execution continuing with the plan suffix; and the current plan may be merged with an "alternate plan" from an on-board library. The plan revision action is chosen to maximize the expected utility of the plan. Plan merging and action deletion constitute a more conservative general-purpose planning system; in return, our approach is more efficient and more easily verified, two important criteria for deployed rovers.

  4. Defense plan of Hydro-Quebec for extreme contingencies

    International Nuclear Information System (INIS)

    Trudel, Guilles; Bernard, Serge; Portales, Esteban

    2000-01-01

    In the last years, Hydro-Quebec it undertook an important program to improve the dependability of their net of energy transport. They concentrated the efforts on increasing the capacity of the net resist in the event of carries to an extreme contingency caused in general by multiple incidents or for successive disconnection of the lines of energy transport. To neutralize these contingencies, Hydro-Quebec it adopted a series of special measures that are contained under the general title of Plan of Defense for Extreme Contingencies. The objective of this plan is to detect the incidents that surpass the capacity of the net. It is completely automatic and it is based mainly in: A system of automatic disconnection of generation and tele-shot of loads; A system of automatic maneuver (opening and closing) of inductances shunt of 735 kw; A system of disconnection of loads for low voltage; A system of disconnection of loads for low frequency. The present document summarizes the orientations that there is taking Hydro-Quebec to protect its net in the event of extreme contingencies and it describes the different automatism that they are adopts, in particular the system automatic disconnection of generation and tele-shot of loads (RPTC) that is one of the main components of the defense plan. The system RPTC detects the simultaneous loss of several lines directly in 15 substations of 735 kw. It understands four places of automatic disconnection of generation and a centralized system of tele-shot of loads

  5. Oil spill contingency planning in the Ivory coast

    International Nuclear Information System (INIS)

    Bender, K.; Jensen, S.K.; Ostergaerd, J.; Nogbou, P.

    1993-01-01

    The administrative center in charge of handling oil spill pollution situations on the Ivory Coast, West Africa, is named Centre Ivoirien Antipollution (CIAPOL). Its organizational structure has been reshuffled recently. CIAPOL now has three divisions: a laboratory division, a division for cleaning up oil and chemical pollution at sea, and an administrative division. The risk for oil pollution is known: within the past ten years five spills have been reported. All of these have been connected to operations relating to the refinery in Abidjan. More than 2,000 ships call at the port of Abidjan every year. Minor oil slicks are found almost permanently in the harbor and the lagoons around the harbor. Lumps of tar are rather common on the beaches all along the country's coast. This paper focuses on the background investigation in sensitive areas and risk analysis that led to a revision of the oil spill contingency plan, Plan Pollumar, and the recent purchase of oil spill cleanup equipment. The creation of a regional oil pollution response center at CIAPOL for all of the countries in West Africa, is proposed

  6. Contingency planning for nuclear emergencies in Hong Kong

    International Nuclear Information System (INIS)

    Wong, M. C.

    2002-01-01

    Two nuclear power stations on the coast of southern China are situated some 50 kilometers to the northeast of Hong Kong. Although the stations are far away from Hong Kong, the construction and operation of the nuclear power stations have generated public anxiety locally, in particular, after the Chernobyl accident in 1986. A comprehensive contingency plan which takes into account such concerns of the public has been implemented in Hong Kong. This plan not only aims to ensure a quick and timely response to mitigate the health impact of any accidental release but also targets to re-assure the public that the territory is not contaminated when appropriate. This paper describes the principal elements of the nuclear contingency plan in Hong Kong, namely, an extensive environmental radiation monitoring programme and a proactive public communication programme

  7. 40 CFR 51.152 - Contingency plans.

    Science.gov (United States)

    2010-07-01

    ... FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Prevention of Air Pollution Emergency... emission control actions to be taken at each episode stage. (Examples of emission control actions are set...: (1) Prompt acquisition of forecasts of atmospheric stagnation conditions and of updates of such...

  8. 10 CFR 72.186 - Change to physical security and safeguards contingency plans.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Change to physical security and safeguards contingency... contingency plans. (a) The licensee shall make no change that would decrease the safeguards effectiveness of... licensee safeguards contingency plan without prior approval of the Commission. A licensee desiring to make...

  9. Sweden; Financial Sector Assessment Program Update: Technical Note on Contingency Planning, Crisis Management and Bank Resolution

    OpenAIRE

    International Monetary Fund

    2011-01-01

    This abstract reviews the recommendations made in the FSAP Update for Sweden in the areas of contingency planning, crisis management, and bank resolution. Although Sweden crisis management fared well during the global financial crisis, its authorities are reviewing the framework for managing financial crises to incorporate crisis lessons. They recommend a domestic institutional framework, an effective cross-border cooperation, an emergency liquidity assistance (ELA), a deposit guarantee schem...

  10. Infrastructure Area Simplification Plan

    CERN Document Server

    Field, L.

    2011-01-01

    The infrastructure area simplification plan was presented at the 3rd EMI All Hands Meeting in Padova. This plan only affects the information and accounting systems as the other areas are new in EMI and hence do not require simplification.

  11. 75 FR 33747 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-06-15

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for... Notice of Intent to Delete the soils of Operable Unit 1 and the underlying ground water of the... National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Texas...

  12. 78 FR 16612 - National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public...

    Science.gov (United States)

    2013-03-18

    ... Hazardous Substances Pollution Contingency Plan (NCP) to broaden the technology, to include computer... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 300 [EPA-HQ-SFUND-2012-0738; FRL-9791-4] National Oil and Hazardous Substances Pollution Contingency Plan; Revision To Increase Public Availability of the...

  13. 78 FR 73449 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-12-06

    ... Substances Pollution Contingency Plan (NCP). This partial deletion pertains to the soil of 1,154 residential...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the Omaha Lead Superfund Site AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...

  14. 76 FR 70105 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List: Partial...

    Science.gov (United States)

    2011-11-10

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Partial Deletion of the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State... property PINs listed above. The deletion of these two parcels from the Site affects all surface soils...

  15. 76 FR 45483 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-07-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for... Contingency Plan (NCP). The EPA and the State of Texas, through the Texas Commission on Environmental Quality... Notice of Deletion for SMPA Superfund Site without prior Notice of Intent for Deletion because EPA views...

  16. 78 FR 11620 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2013-02-19

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List: Deletion of the Kerr... Substances Pollution Contingency Plan (NCP). EPA and the State of Illinois, through the Illinois... because we view this as a noncontroversial revision and anticipate no adverse comment. We have explained...

  17. 78 FR 45905 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-30

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Craig... Substances Pollution Contingency Plan (NCP). The EPA and the Commonwealth of Pennsylvania, through the... Craig Farm Drum Superfund Site without prior Notice of Intent to Delete because we view this as a...

  18. 76 FR 45484 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-07-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... PBL Superfund Site without prior Notice of Intent for Deletion because EPA views this as a...

  19. 77 FR 43567 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-07-25

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Fort... Contingency Plan (NCP). The EPA and the State of New Jersey, through the NJ Department of Environmental... Intent to Delete because we view this as a noncontroversial revision and anticipate no adverse comment...

  20. 78 FR 69360 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-11-19

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial... and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of California... Corp Air Station Superfund Site without prior Notice of Intent for Partial Deletion because EPA views...

  1. 76 FR 18136 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-04-01

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Norwood... amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... we view this as a noncontroversial revision and anticipate no adverse comment. We have explained our...

  2. 76 FR 50441 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-15

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of New Jersey, through the New Jersey... Deletion of the Sayreville Landfill Superfund Site without prior Notice of Intent to Delete because we view...

  3. 78 FR 48844 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-08-12

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Mosley... National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the State of Oklahoma... Deletion of the MRSL Superfund Site without prior Notice of Intent to Delete because we view this as a...

  4. 76 FR 20605 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2011-04-13

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). EPA and the State of Michigan, through the Michigan Department... Delete because we view this as a noncontroversial revision and anticipate no adverse comment. We have...

  5. 76 FR 70057 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-11-10

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Partial Deletion of the...). Refer to Figures 1 to 3 in the deletion docket to view the location of the two parcels being proposed... Substances Pollution Contingency Plan (NCP). This direct final partial deletion is being published by EPA...

  6. 75 FR 43115 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-07-23

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent to Partially..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... Intent for Partial Deletion because EPA views this as a noncontroversial revision and anticipates no...

  7. 75 FR 47521 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent...

    Science.gov (United States)

    2010-08-06

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List: Intent To Delete the... appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The EPA and the... Corporation (Markhams) Superfund Site without prior notice of intent to delete because we view this as a...

  8. 78 FR 47267 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-08-05

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Contingency Plan (NCP). The EPA and the State of Oklahoma, through the Oklahoma Department of Environmental... without prior Notice of Intent to Delete because we view this as a noncontroversial revision and...

  9. 78 FR 66325 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-11-05

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). The EPA and the State of South Carolina, through the South... because we view this as a noncontroversial revision and anticipate no adverse comment. We have explained...

  10. 78 FR 60809 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-10-02

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Substances Pollution Contingency Plan (NCP). EPA and the State of New York, through the New York State... Deletion of the Site without prior Notice of Intent to Delete because EPA views this as a noncontroversial...

  11. 76 FR 51316 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-18

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... Contingency Plan (NCP). The EPA and the Commonwealth of Puerto Rico, through the Puerto Rico Environmental... Site without prior Notice of Intent to Delete because we view this as a noncontroversial revision and...

  12. 78 FR 44512 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-24

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Sola... Pollution Contingency Plan (NCP). The EPA and the State of California, through the Regional Water Quality...., Inc. Superfund Site without prior Notice of Intent to Delete because we view this as a...

  13. 76 FR 32115 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-06-03

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Intent To Delete the... Substances Pollution Contingency Plan (NCP). The EPA and the State of Delaware, through the Delaware... Delete because EPA views this as a noncontroversial revision and anticipates no adverse comment. We have...

  14. 76 FR 81904 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-12-29

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Hipps..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan... of Intent to Delete because we view this as a noncontroversial revision and anticipate no adverse...

  15. 75 FR 54821 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent...

    Science.gov (United States)

    2010-09-09

    ... and Hazardous Substance Pollution Contingency Plan; National Priorities List; Intent for Partial... amended, is an Appendix of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). The... Superfund Site without prior Notice of Intent for Partial Deletion because EPA views this as a...

  16. 78 FR 45167 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-26

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the Cannon... Substances Pollution Contingency Plan (NCP). The EPA and the State of Massachusetts, through the...), Superfund Site without prior Notice of Intent to Delete because we view this as a noncontroversial revision...

  17. 77 FR 67783 - National Oil and Hazardous Substance Pollution Contingency Plan National Priorities List...

    Science.gov (United States)

    2012-11-14

    ... and Hazardous Substance Pollution Contingency Plan National Priorities List: Deletion of the Waste... and Hazardous Substances Pollution Contingency Plan (NCP). EPA and the State of Michigan, through the...-Holland Lagoons Superfund Site without prior Notice of Intent to Delete because we view this as a...

  18. 78 FR 60721 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-10-02

    ...] National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the... final Notice of Deletion of the Ludlow Sand & Gravel Superfund Site (Site), located in the Town of Paris..., as amended, is an appendix of the National Oil and Hazardous Substances Pollution Contingency Plan...

  19. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    Science.gov (United States)

    2012-05-22

    common PREREQ 1 Walkable Streets yes Planning, Desi gn, Construction, OaM Medium use areas. Plan careft,j!y to accommodate simftar functions in the...apjly the specific LEED·ND criteria. Pay special attention to roads that connect LSA ~ife support areas) to common Walkable Streets yes Planning... Walkable Streets  Intent: ►To promote transportation efficiency. ►To promote walking by providing: • Safe •Appealing •Comfortable street

  20. Year 2000 Contingency Planning and Cost Reporting at the Defense Finance and Accounting Service

    National Research Council Canada - National Science Library

    1998-01-01

    ...: complied with the requirements of the DoD Year 2000 Management Plan, prepared adequate Year 2000 system-level contingency plans, and reported complete and reliable Year 2000 system cost estimates...

  1. Getting help quickly: older people and community worker perspectives of contingency planning for falls management.

    Science.gov (United States)

    Charlton, Kimberly; Murray, Carolyn M; Kumar, Saravana

    2018-01-01

    Older people living in the community need to plan for getting help quickly if they have a fall. In this paper planning for falls is referred to as contingency planning and is not a falls prevention strategy but rather a falls management strategy. This research explored the perspectives of older people and community workers (CWs) about contingency planning for a fall. Using a qualitative descriptive approach, participants were recruited through a community agency that supports older people. In-depth interviews were conducted with seven older people (67-89 years of age) and a focus group was held with seven workers of mixed disciplines from the same agency. Older people who hadn't fallen were included but were assumed to be at risk of falls because they were in receipt of services. Thematic analysis and concept mapping combined the data from the two participant groups. Four themes including preconceptions about planning ahead for falling, a fall changes perception, giving, and receiving advice about contingency plans and what to do about falling. Both CWs and older people agree contingency planning requires understanding of individual identity and circumstances. CWs have limited knowledge about contingency planning and may be directive, informative, or conservative. Implications for Rehabilitation Falls can result in serious consequences for older people. There is an evidence-practice gap as availability of and access to contingency planning does not necessarily mean older people will use it in a falls emergency. Older people prefer community workers to be directive or informative about contingency planning options but they do want choice and control. Increased community workers knowledge of, and collaborative decision-making about, contingency planning may promote patient-centered services and assist in closing the evidence-practice gap.

  2. Contingency planning for rapid reduction of greenhouse gas emissions

    Directory of Open Access Journals (Sweden)

    Larsson, Nils K.

    2010-03-01

    Full Text Available The current and predicted levels of greenhouse gas (GHG emissions are, according to the best international scientific estimates, leading the world towards climate change that will have serious consequences for all countries. The problem is aggravated by the tendency of people and institutions not to take action until catastrophic consequences emerge. The history of crises in other sectors show us that reactions are likely to focus on ad-hoc reactions or using plans that are readily available, with negative results. However, the alternative of developing public plans for drastic and rapid reductions is not likely to gain support because of their radical nature. The author therefore proposes that large organizations with direct or indirect control over substantial GHG emissions should prepare private contingency plans for very rapid reductions in emissions, so that more rational and less destructive plans will be available when the appropriate moment comes for last-minute action. Examples of the type of specific plans that may be appropriate are suggested.

    Según las estimaciones científicas internacionales más optimistas, los niveles actuales y previstos de emisiones de gases de efecto invernadero (GEI están llevando al mundo hacia un cambio climático que tendrá graves consecuencias para todos los países. El problema se ve agravado por la tendencia de personas e instituciones a no tomar medidas hasta que no se perciben las catastróficas consecuencias. El historial de crisis ocurridas en otros sectores nos demuestra que las reacciones probablemente se centren en medidas ad hoc o en emplear planes que ya existían, pero sin resultados. Sin embargo, es poco probable que la alternativa al desarrollo de planes públicos para las reducciones drásticas y rápidas consiga el apoyo necesario, debido precisamente a su radicalidad. El autor recomienda por tanto que las grandes organizaciones que tengan control directo o indirecto sobre un

  3. Power plant construction lead times: The value of contingency planning

    International Nuclear Information System (INIS)

    Rubin, L.J.

    1985-01-01

    In this paper an analysis of two different approaches to the construction of a major power plant (nuclear) is presented. The analysis compares an accelerated, ''go-for-broke'' strategy-which has some risk of being delayed-with a more deliberate contingency construction schedule in terms of revenue requirements and costs of electricity. It is demonstrated that under a wide variety of circumstances there are important advantages to the contingency strategy, but that the magnitude of those advantages is sensitive to the character of the power system being examined and to the flexibility of the contingency approach

  4. Contingency planning at the flotilla level in the United States Coast Guard Auxiliary: flotilla 81-a case study.

    Science.gov (United States)

    Schooley, Shawn Erik

    2013-01-01

    This article presents a case study of United States Coast Guard Auxiliary Flotilla 81. Flotilla 81 created its first formal, single agency contingency plan. The research question addressed is "How can a flotilla successfully develop a contingency plan?" Five emergent themes are identified. They are offered as suggested promising practices for other flotillas in need of creating a contingency plan. Findings suggest successful contingency planning is a result of effective collaboration with community partners. Network management theory is a key to an effective contingency planning process.

  5. Criteria for selection of fuel cycle and major materials licenses needing radiological contingency plans. Regulatory report

    International Nuclear Information System (INIS)

    Fisher, F.D.

    1981-07-01

    Quantities of NRC-licensed radioisotopes requiring the licensee to develop and submit radiological contingency planning information to the NRC for review and approval are developed and presented as limiting possession limits and conditions of possession

  6. 76 FR 56294 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List

    Science.gov (United States)

    2011-09-13

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental relations, Penalties... error in processing the direct- final rule. The online Federal Document Management System (FDMS) did not...

  7. 76 FR 56362 - National Oil and Hazardous Substances Pollution Contingency Plan National Priorities List

    Science.gov (United States)

    2011-09-13

    ... and Hazardous Substances Pollution Contingency Plan National Priorities List AGENCY: Environmental... protection, Air pollution control, Chemicals, Hazardous Waste, Hazardous substances, Intergovernmental... processing the deletion notice. The online Federal Document Management System (FDMS) did not include required...

  8. 75 FR 44920 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-07-30

    ... State Registry of Inactive Hazardous Waste Disposal Sites as a ``Class 2 Inactive Hazardous Waste Site..., Chemicals, Hazardous waste, Hazardous substances, Intergovernmental relations, Natural resources, Oil... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Deletion of the SMS...

  9. 76 FR 510 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-01-05

    ..., Intergovernmental relations, Penalties, Reporting and recordkeeping requirements, Superfund, Water pollution control... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... Site is located in Albuquerque, Bernalillo County, New Mexico. After this deletion, this 62 acres will...

  10. 120-D-1 (100-D) Ponds supplemental information to the Hanford Facility Contingency Plan. Revision 2

    International Nuclear Information System (INIS)

    Petersen, S.W.; Zoric, J.P.

    1997-06-01

    This document is a supplement to the Hanford Facility Contingency Plan and provides the unit-specific information needed to fully comply with the Washington Administrative Code 173-303 for contingency plans. The 100-D ponds are unlined surface impoundments that were mainly used to dispose of nondangerous wastewater, The ponds are designated as a single treatment, storage, and/or disposal unit because of potential corrosive characteristics of the wastewater. No waste is currently present at the 100-D Ponds

  11. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Paulo Roberto Werneck de, E-mail: paulo@pwerneck.com [Universidade Federal Fluminense (UFF), Angra dos Reis, RJ (Brazil); Hora, Antonio Ferreira da, E-mail: dahora@vm.uff.br [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2015-07-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  12. Contingency planning for nuclear plants: an approach for use in industrial plants and hazardous products storage facilities

    International Nuclear Information System (INIS)

    Carvalho, Paulo Roberto Werneck de; Hora, Antonio Ferreira da

    2015-01-01

    The purpose of this paper is establishing a basic system model for the development of contingency plans for emergencies. This includes the identification of agents involved in aid and assistance planning, pointing out communication chains among them, the delegation of action coordination and control, as well as the composition and structure of crisis centers equipped with physical and technological resources, the development of emergency procedures, the training of the teams involved, drill planning, and a policy for interactions with community members and the media in the course of a crisis. This paper aims at proposing actions in case an emergency affects the surroundings areas to the accident site. The outlined propositions are not to be adopted only under nuclear or radiological emergencies, since Brazil has specific legislation for this purpose, as established in the Brazilian Nuclear Program Protection System (SIPRON), in addition to the structures and contingency plans currently implemented, validated and periodically tested. (author)

  13. Development of a unified federal/state coastal/inland oil and hazardous substance contingency plan for the state of Alaska

    International Nuclear Information System (INIS)

    Lautenberger, C.; Pearson, L.

    1993-01-01

    Passage of the US Oil Pollution Act (OPA) of 1990 expanded the existing federal planning and response framework in several ways. The OPA created a new requirement for facility and tank vessel response plans and creates an area-level planning and coordination structure to help supplement federal, regional, and local planning efforts. The OPA amended the existing Clean Water Act's section 311(j)(4), which establishes area committees and area contingency plans as primary components of this structure. In 1980, the Alaska legislature enacted legislation which defines the state's policies regarding oil spills. Following the 1989 Exxon Valdez spill, additional legislation was passed to expand and strengthen the state's oil spill program. Specifically, in 1989 the Senate Bill 261 required the Alaska Department of Environmental Conservation to develop, annually review, and revise the State Oil and Hazardous Substance Contingency Plans (State Master and Regional Plans). State regional plans serve as annexes to the State Master Plan. The coordinated and cooperative efforts by government agencies and local entities toward creating a unified federal/state, coastal/inland Oil and Hazardous Substance Contingency Plan are presented, along with the development and progress of unified area/regional contingency plans for Alaska. 3 figs

  14. Graded Approach to the Development of a Contingency Plan for On-Line Maintenance

    International Nuclear Information System (INIS)

    Chang, Hee Seung; Kim, Jung Wun; Song, Tae Young

    2012-01-01

    Many utilities perform preventive maintenance for safety systems during power operation to improve equipment reliability so as to focus on the work activities more easily and improve the quality of maintenance. Such a strategy can also reduce outage work activities, thus allowing resources to be utilized effectively. Preventive maintenance during power operation, known as on-line maintenance (OLM), requires an assessment and mitigation of risk, which can increase owing to out-of-service safety systems. One of the mitigation action plans is a contingency plan. EPRI recommends the development of a contingency plan for all planned system outages which include factors that strongly affect safety. The Korea Hydro and Nuclear Power Company (KHNP) undertook the preventive maintenance of the Essential Chilled Water System (ECWS) of a Westinghouse plant as a pilot OLM implementation. During the preparation of the work activities, a contingency plan was a pertinent issue during the discussions with regulators, especially regarding the scope and depth of the plan. This paper discusses the purpose of a contingency plan, including as examples some cases of US utilities, and proposes a graded approach to develop a contingency plan for OLM in consideration of the risks

  15. Contingency plan for deployment of the void fraction instrument in Tank 241-AY-102

    International Nuclear Information System (INIS)

    CONNER, J.M.

    1999-01-01

    High-heat producing sludge from tank 241-C-106 will be sluiced and transferred to tank 241-AY-102 beginning in October 1998. Safety analyses have postulated that after retrieval, the waste in 241-AY-102 may generate and retain unsafe levels of flammable gases (Noorani 1998, Pasamebmetoglu etal. 1997). Unsafe levels of retained gas are not expected, but cannot be ruled out because of the large uncertainty in the gas generation and retention rates. The Tank Waste Remediation System Basis for Interim Operation (Noorani 1998) identifies the need for a contingency plan to add void fraction monitoring to tank 241-AY-102 within 2 weeks of the identification of flammable gas buildup that would warrant monitoring. The Tank 241-C-106 Waste Retrieval Sluicing System Process Control Plan (Carothers et al. 1998) committed to providing a contingency plan for deployment of the void fraction instrument (VFI) in tank 241-AY-102. The VFI determines the local void fraction of the waste by compressing a waste sample captured in a gas-tight test chamber. The sample chamber is mounted on the end of a 76-cm (2.5-ft) arm that can be rotated from vertical to horizontal when the instrument is deployed. Once in the waste, the arm can be positioned horizontally and rotated to sample in different areas below the riser. The VFI is deployed using a crane. The VFI has been deployed previously in 241-AW, 241-AN, and 241-SY tank farms, most recently in tank 241-SY-101 in June and July 1998. An additional test in tank 241-SY-101 is planned in September 1998. Operating instructions for the VFI are included in the Void Fraction Instrument Operation and Maintenance Manual (Pearce 1994)

  16. 202-S Hexone Facility supplemental information to the Hanford Facility Contingency Plan

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-03-01

    This document is a unit-specific contingency plan for the 202-S Hexone Facility and is intended to be used as a supplement to the Hanford Facility Contingency Plan. This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of WAC 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units. The 202-S Hexone Facility is not used to process radioactive or nonradioactive hazardous material. Radioactive, dangerous waste material is contained in two underground storage tanks, 276-S-141 and 276-S-142. These tanks do not present a significant hazard to adjacent facilities, personnel, or the environment. Currently, dangerous waste management activities are not being applied at the tanks. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 202-S Hexone Facility

  17. Standard format and content for radiological contingency plans for fuel cycle and materials facilities. Regulatory report

    International Nuclear Information System (INIS)

    1981-07-01

    This report is issued as guidance to those fuel cycle and major materials licensees who are required by the NRC to prepare and submit a radiological contingency plan. This Standard Format has been prepared to help assure uniformity and completeness in the preparation of those plans

  18. Unit-specific contingency plan for the 183-H solar evaporation basins. Revision 1

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1996-03-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H solar evaporation basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  19. Unit-specific contingency plan for the 183-H Solar Evaporation Basins. Revision 2

    International Nuclear Information System (INIS)

    Zoric, J.P.

    1997-01-01

    This document is a supplement to the Hanford Facility Contingency Plan. It provides the unit-specific information needed to fully comply with the Washington Administrative Code, Chapter 173-303, ''Dangerous Waste Regulations,'' for contingency plans. General emergency and response information is contained in the Hanford Facility Contingency Plan and is not repeated in this supplement. The 183-H Solar Evaporation Basins are four concrete internal surfaces which contained radiologically- and hazardous-contaminated waste. The 183-H basins are currently empty, inactive and designated as a Resource Conservation and Recovery Act interim-status treatment, storage, and disposal unit undergoing closure. There is no dangerous waste management actively occurring. There is very little likelihood of any incidents that would present hazards to public health or the environment occurring at the 183-H basins

  20. Attenuation of the contingency detection effect in the extrastriate body area in autism spectrum disorder.

    Science.gov (United States)

    Okamoto, Yuko; Kitada, Ryo; Tanabe, Hiroki C; Hayashi, Masamichi J; Kochiyama, Takanori; Munesue, Toshio; Ishitobi, Makoto; Saito, Daisuke N; Yanaka, Hisakazu T; Omori, Masao; Wada, Yuji; Okazawa, Hidehiko; Sasaki, Akihiro T; Morita, Tomoyo; Itakura, Shoji; Kosaka, Hirotaka; Sadato, Norihiro

    2014-10-01

    Detection of the contingency between one's own behavior and consequent social events is important for normal social development, and impaired contingency detection may be a cause of autism spectrum disorder (ASD). To depict the neural underpinnings of this contingency effect, 19 adults with ASD and 22 control participants underwent functional MRI while imitating another's actions and their actions being imitated by the other. As the extrastriate body area (EBA) receives efference copies of one's own movements, we predicted that the EBA would show an atypical response during contingency detection in ASD. We manipulated two factors: the congruency of the executed and observed actions, and the order of action execution and observation. Both groups showed the congruency effect in the bilateral EBA during imitation. When action preceded observation, the left EBA of the control group showed the congruency effect, representing the response to being imitated, indicating contingency detection. The ASD group showed a reduced contingency effect in the left EBA. These results indicate that the function of the EBA in the contingency detection is altered in ASD. Copyright © 2014 Elsevier Ireland Ltd and the Japan Neuroscience Society. All rights reserved.

  1. Nonradioactive Dangerous Waste Landfill supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the Nonradioactive Dangerous Waste Landfill and is intended to be used as a supplement to DOE/RL-93-75, 'Hanford Facility Contingency Plan.' This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173-303 for certain Resource, Conservation and Recovery Act of 1976 waste management units. The Nonradioactive Dangerous Waste Landfill (located approximately 3.5 miles southeast of the 200 East Area at the Hanford Site) was used for disposal of nonradioactive dangerous waste from January 1975 to May 1985. Currently, there are no dangerous waste streams disposed in the Nonradioactive Dangerous Waste Landfill. Dangerous waste management activities are no longer required at the landfill. The landfill does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that incidents presenting hazards to public health or the environment would occur at the Nonradioactive Dangerous Waste Landfill

  2. Neither snow nor rain: contingency planning by a clinical reference laboratory courier service for weather related emergencies.

    Science.gov (United States)

    Bankson, Daniel D; Heim, Joseph A

    2014-01-01

    To optimize transportation processes, we present herein a contingency plan that coordinates interim measures used to ensure continued and timely services when climate based events might cause an interruption of the usual specimen transportation processes. As an example, we outline the implementation and effectiveness of a contingency plan for network laboratory courier automobile transportation during times of mountain pass highway closure. Data available from an approximately 3-year period from October 10, 2010 through August 29, 2013 revealed a total of 690 complete closures in the eastbound or westbound lanes of the Interstate-90 highway in the Snoqualmie Pass area in the state of Washington. Despite the frequency of closures, the Washington State Department of Transportation was effective in limiting the duration of closures. Road closures of less than 1 hour accounted for 58.7% of the total closures. No recorded closures prevented dispatched couriers from completing a prescheduled Snoqualmie Pass route. We identified no delays as being clinically significant, despite that there were 5 instances of delays greater than 4 hours. We implemented a contingency plan of aiding courier logistics during all times of pass closure. The plan includes an easy to interpret Condition Dashboard as a status indicator and a Decision Tree that references and summarizes information. Overall, the contingency plan allows for an objective, robust, proactive decision support system that has enabled operational flexibility and has contributed to continued safe, on-time specimen transportation; clients and courier and reference laboratory staff have appreciated these features and associated outcomes. Copyright© by the American Society for Clinical Pathology (ASCP).

  3. 40 CFR 109.5 - Development and implementation criteria for State, local and regional oil removal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Development and implementation criteria for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection of...

  4. Application of Planned Behavior Theory to Account for College Students' Occupational Intentions in Contingent Employment

    Science.gov (United States)

    Huang, Jie-Tsuen

    2011-01-01

    The purpose of this study was to apply Ajzen's (1991) theory of planned behavior to examine college students' intentions to engage in contingent employment. Data were collected from 845 students in 8 colleges and universities in Taiwan. The results of structural equation modeling analyses indicated that both attitude and subjective norms were…

  5. 76 FR 11350 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-03-02

    ..., Reporting and recordkeeping requirements, Superfund, Water pollution control, Water supply. Dated: February... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... Mexico, from the National Priorities List (NPL). The NPL, promulgated pursuant to section 105 of the...

  6. 75 FR 55479 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-09-13

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... . SUPPLEMENTARY INFORMATION: The portion of the site to be deleted from the NPL is the surface media (soil... further actions. List of Subjects in 40 CFR Part 300 Environmental protection, Air pollution control...

  7. 77 FR 31215 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-05-25

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Partial Deletion of the... the surface soil, unsaturated subsurface soil, surface water and sediments of Operable Unit (OU) 1...: The Environmental Protection Agency (EPA) Region 8 announces the deletion of Operable Unit (OU) 1--the...

  8. ANALISIS SENSITIVITAS LINGKUNGAN OSCP (OIL SPILL CONTINGENCY PLAN DI PESISIR SELATAN DELTA MAHAKAM, PROVINSI KALIMANTAN TIMUR

    Directory of Open Access Journals (Sweden)

    Mursalin Mursalin

    2014-07-01

    Full Text Available The research was one part of oil spill contingency plan (OSCP developed for Delta Mahakam area, where oil & gas exploration and exploitation linked with rich biodiversity supporting coastal community livelihood. Environmental sensitivity  analysis for OSCP only do two early stages of OSCP scope, which integrated with the dangers of coastal vulnerability. This analysis mapped environmental component from oil pollution become sensitivity rangking as an effort to support response development strategies and priorities for the coastal resources protection. The aims of this research were (1 to establish environment sensitivity rank and (2 to identify primary factor supporting the environmental sensitivity for OSCP in south Delta Mahakam area. The result of analysis showed environmenal sensitivity was 62.37% (517.52 km, its mean very high sensitivity. Then the high sensitivity criteria was 11.31% (94 km. The criteria of medium sensitivity was 11.92% (99 km. While for low sensitivity and very low sensitivity respectively were 1.78% (15 km and 12.64% (105 km. Based on Principal Component Analysis (PCA, 36.01%  variability was explained by axis of factor 1. The others variability 18.53% and 13.93% were explained by axis of the factor 2 and factor 3. Axis of factor 1 for coastal exposure (EK, oil residence index (OR, coastal type (TP, and biological resources (SH had a quite large linear combinations coefficient, amounted to 0.94 (EK&OR, 0.83 (TP and 0.75 (SH. This indicated a very high contribution for environmental sensitivity OSCP level drafting. On axis of factor 2, the linear coeffisien combinations for the resource utilization of port (PL was 0.83 and settlement (PM was 0.85. Axis of factor 3 contributed 0.75 and 0.66 on migas platform (PO and placement of passive fishing gear/catchment area (AT. However, the utilization of coastal resources for PL, PM, PO and AT were on axis of factor 2 and factor 3 had a considerable distance with its SI variable

  9. Thinking ahead about reproductive health: contingency planning and emergency preparedness in crisis situations (Iraq and West Africa).

    Science.gov (United States)

    DeLargy, Pamela; Alakbarov, Ramiz

    2004-09-01

    The United Nations Population Fund (UNFPA) coordinated efforts to integrate RH into contingency planning for the 2003 Iraq crisis and the 2003 regional response for displaced populations in West Africa. Using UNFPA's network of country offices in the Middle East, staff developed logistics plans, conducted workshops and pre-positioned RH supplies. Though refugee movements did not occur, the contingency planning enhanced the response capacity of UNFPA offices and made it possible to rapidly provide assistance inside Iraq. In West Africa, multi-country workshops and follow-up resulted in country-level and regional action plans useful during the renewed crises of 2003; scarce funding, however, limited their full implementation. UNFPA's experiences show that contingency planning requires committing resources for crises, some of which will not occur; new staff skills; and follow-up. Moreover, RH is considered by some to be additional to the core elements of contingency planning. RH's political sensitivity, particularly with certain donors, further complicated integrated planning.

  10. [Scientific basis of environmental health contingency planning for a coastal oil spill].

    Science.gov (United States)

    Kim, Young Min; Cheong, Hae Kwan; Kim, Jong Ho; Kim, Jong Hun; Ko, Kumsook; Ha, Mina

    2009-03-01

    This study presents a scientific basis for the establishment of an environmental health contingency plan for dealing with accidental coastal oil spills and suggests some strategies for use in an environmental health emergency. We reviewed the existing literature, and analyzed the various fundamental factors involved in response strategies for oil spill. Our analysis included data derived from Hebei Spirit oil spill and used air dispersion modeling. Spill amounts of more than 1,000 kl can affect the health of residents along the coast, especially those who belong to vulnerable groups. Almost 30% of South Korean population lives in the vicinity of the coast. The area that is at the highest risk for a spill and that has the greatest number of people at risk is the stretch of coastline from Busan to Tongyeong. The most prevalent types of oil spilt in Korean waters have been crude oil and bunker-C oil, both of which have relatively high specific gravity and contain volatile organic compounds, polycyclic aromatic hydrocarbons, and metals. In the case of a spill of more than 1,000 kl, it may be necessary to evacuate vulnerable and sensitive groups. The government should establish environmental health planning that considers the spill amount, the types of oil, and the distance between the spot of the accident and the coast, and should assemble a response team that includes environmental health specialists to prepare for the future oil spill.

  11. The management of acute risks. Oil spill contingency planning and response

    International Nuclear Information System (INIS)

    Monk, D.C.; Cormack, D.

    1992-01-01

    It is clear that the risks of environmental damage can be best minimized by preventing oil spills from occurring at all. Since absolute prevention is unrealistic, however, early detection is essential and aerial surveillance techniques are of great value in this connection. If spills do occur, proper contingency planning and clean-up techniques can minimize impacts, but will rarely avoid them completely if the spilled oil reaches the coastline. It is evident that a main priority should be to prevent spilled oil reaching the coastline. The way in which oil spill response strategy is implemented is discussed in detail. It is based on four key elements: the allocation of responsibilities; contingency planning; training and exercises; regular audit of plans and response mechanisms. A case study of the oil spill strategy employed at the Sullom Voe oil terminal in Shetland is used as an illustration. (UK)

  12. Contingency plan for the Oak Ridge National Laboratory liquid low-level waste system

    International Nuclear Information System (INIS)

    DePaoli, S.M.; Ferrada, J.J.; Abraham, T.J.; Brown, C.H.; Lin, K.H.

    1989-12-01

    Oak Ridge National Laboratory (ORNL) is one of the major Department of Energy (DOE) facilities that performs various research and development (R ampersand D) activities. Liquid low-level waste (LLLW) is generated in the course of this work. The primary objective of this task is to develop specific plans of action to be implemented, in the event that the storage space for the LLLW concentrate should approach the minimum value in the operational flexibility range or a problem should develop concerning storage space available for dilute LLLW. This report considers contingency plans/options in the light of six different scenarios, including ''normal operation'' and five others. Evaluation and prioritization of the options were carried out separately for each case. Brief discussions of these scenarios and contingency plans/options are presented. 20 refs., 14 figs., 14 tabs

  13. Disaster and Contingency Planning for Scientific Shared Resource Cores.

    Science.gov (United States)

    Mische, Sheenah; Wilkerson, Amy

    2016-04-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores ("cores") to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution's overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy.

  14. Disaster and Contingency Planning for Scientific Shared Resource Cores

    Science.gov (United States)

    Wilkerson, Amy

    2016-01-01

    Progress in biomedical research is largely driven by improvements, innovations, and breakthroughs in technology, accelerating the research process, and an increasingly complex collaboration of both clinical and basic science. This increasing sophistication has driven the need for centralized shared resource cores (“cores”) to serve the scientific community. From a biomedical research enterprise perspective, centralized resource cores are essential to increased scientific, operational, and cost effectiveness; however, the concentration of instrumentation and resources in the cores may render them highly vulnerable to damage from severe weather and other disasters. As such, protection of these assets and the ability to recover from a disaster is increasingly critical to the mission and success of the institution. Therefore, cores should develop and implement both disaster and business continuity plans and be an integral part of the institution’s overall plans. Here we provide an overview of key elements required for core disaster and business continuity plans, guidance, and tools for developing these plans, and real-life lessons learned at a large research institution in the aftermath of Superstorm Sandy. PMID:26848285

  15. A methodology to assist in contingency planning for protection of nuclear power plants against land vehicle bombs

    International Nuclear Information System (INIS)

    James, J.W.; Goldman, L.A.; Lobner, P.R.; Finn, S.P.; Koch, T.H.; Veatch, J.D.

    1989-04-01

    This report provides a methodology which could be used by operators of licensed nuclear power reactors to address issues related to contingency planning for a land vehicle bomb, should such a threat arise. The methodology presented in this report provides a structured framework for understanding factors to be considered in contingency planning for a land vehicle bomb including: (1) system options available to maintain a safe condition, (2) associated components and equipment, (3) preferred system options for establishing and maintaining a safe shutdown condition, and (4) contingency measures to preserve the preferred system options. Example applications of the methodology for a Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) are provided along with an example of contingency plan changes necessary for implementation of this methodology, a discussion of some contingency measures that can be used to limit land vehicle access, and a bibliography. 2 refs., 11 figs., 6 tabs

  16. Y2K compliance readiness and contingency planning.

    Science.gov (United States)

    Stahl, S; Cohan, D

    1999-09-01

    As the millennium approaches, discussion of "Y2K compliance" will shift to discussion of "Y2K readiness." While "compliance" focuses on the technological functioning of one's own computers, "readiness" focuses on the operational planning required in a world of interdependence, in which the functionality of one's own computers is only part of the story. "Readiness" includes the ability to cope with potential Y2K failures of vendors, suppliers, staff, banks, utility companies, and others. Administrators must apply their traditional skills of analysis, inquiry and diligence to the manifold imaginable challenges which Y2K will thrust upon their facilities. The SPICE template can be used as a systematic tool to guide planning for this historic event.

  17. Contingency plans for the ISEE-3 libration-point mission

    Science.gov (United States)

    Dunham, D. W.

    1979-01-01

    During the planning stage of the International Sun-Earth Explorer-3 (ISEE-3) mission, a recovery strategy was developed in case the Delta rocket underperformed during the launch phase. If a large underburn had occurred, the ISEE-3 spacecraft would have been allowed to complete one revolution of its highly elliptical earth orbit. The recovery plan called for a maneuver near perigee to increase the energy of the off-nominal orbit; a relatively small second maneuver would then insert the spacecraft into a new transfer trajectory toward the desired halo orbit target, and a third maneuver would place the spacecraft in the halo orbit. Results of the study showed that a large range of underburns could be corrected for a total nominal velocity deviation cost within the ISEE-3 fuel budget.

  18. The Peoples Liberation Army and Contingency Planning in China

    Science.gov (United States)

    2015-01-01

    protests; blocking traffic; or large-scale gatherings involving sporting events, commercial activities, or entertainment . During such events, the...holding large-scale exhibi- tions and cultural, sports , or other events. Recent examples where such plans appear to have been in place include the...pollution, and damage to the environment • public health incidents, which include epidemics, food safety and occu- pational hazards, animal diseases, and

  19. Standby Gasoline Rationing Plan. Contingency gasoline rationing regulations

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    The Economic Regulatory Administration issues final rules with respect to standby gasoline rationing. The plan is designed for and would be used only in the event of a severe gasoline shortage. The plan provides that eligibility for ration allotments will be primarily on the basis of motor vehicle registrations. DOE will mail government ration checks to the parties named in a national vehicle registration file to be maintained by DOE. Ration recipients may cash these checks for ration coupons at various designated coupon issuance points. Retail outlets and other suppliers will be required to redeem the ration coupons received in exchange for gasoline sold. Supplemental gas will be given to high-priority activities. A ration banking system will be established with two separate and distinct of ration accounts: retail outlets and other suppliers will open redemption accounts for the deposit of redeemed ration rights; and individuals or firms may open ration rights accounts, which will operate in much the same manner as monetary checking accounts. A white market will be permitted for the sale of transfer of ration rights. A percentage of the total ration rights to be issued will be reserved for distribution to the states as a State Ration Reserve, to be used by the states primarily for the relief of hardship. A National Ration Reserave will also be established. All sections of the Standby Gasoline Rationing Regulations are analyzed. (MCW)

  20. Resource Conservation and Recovery Act (RCRA) general contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    Skaggs, B.E.

    1993-11-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures herein can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  1. Resource Conservation and Recovery Act (RCRA) contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-08-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  2. Hanford 300 Area Development Plan

    International Nuclear Information System (INIS)

    Daly, K.S.; Seiler, S.W.; Hail, J.C.

    1991-09-01

    The purpose of the Hanford 300 Area Development Plan (Development Plan) is to guide the physical development of the 300 Area in accordance with US Department of Energy (DOE) Order 4320.1B (DOE 1991b) by performing the following: (1) Establishing a land use plan, setting land use categories that meet the needs of existing and proposed activities; (2) Coordinating existing, 5-yr, and long-range development plans and guiding growth in accordance with those plans; (3) Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities; (4) Identifying site development issues that need further analysis; Integrating program plans with development plans to ensure a logical progression of development; and, (6) Integrating DOE plans with local agency plans (i.e., city, country, state, and Tri-Cities Science and Technology Park plans)

  3. Contingency plans for chromium utilization. Publication NMAB-335

    International Nuclear Information System (INIS)

    1978-01-01

    The United States depends entirely on foreign sources for the critical material, chromium, making it very vulnerable to supply disruptions. This vulnerability results because chromium is essential for the fabrication of corrosion-resisting steels and high-temperature, oxidation-resisting alloys in applications that are vital to the nation's technological well-being; because no substitutes are known for these materials in those applications; and because the known, substantial deposits of chromite ore are only in a few geographical locations that could become inaccessible to the United States as a result of political actions. The effectiveness of programs such as stockpiling, conservation, and research and development for substitutes to reduce the impact of disruption of imports of chromite and ferrochromium are discussed. Alternatives for decreasing chromium consumption also are identified for chromium-containing materials in the areas of design, processing, and substitution

  4. Oil spill contingency planning for offshore oil fields - a new concept established for the Norwegian continental shelf

    International Nuclear Information System (INIS)

    Singsaas, I.; Reed, M.; Nygaard, T.; Sundnes, G.Jr.

    1998-01-01

    The development of a new concept for oil spill contingency planning to be used for offshore oil fields on the Norwegian continental shelf was discussed. The factors which are important in developing a good oil spill contingency plan include a good understanding of: (1) the fate, behaviour and weathering of the specific oil, (2) relevant oil spill scenarios, (3) drift and spreading of the oil, and (4) specific requirements for the effectiveness of the chosen response options. The oil spill contingency and response (OSCAR) model was used for quantitative comparison of alternative response options. 21 refs., 2 tabs., 7 figs

  5. Hanford 200 Areas Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas.

  6. Hanford 200 Areas Development Plan

    International Nuclear Information System (INIS)

    Rinne, C.A.; Daly, K.S.

    1993-08-01

    The purpose of the Hanford 200 Areas Development Plan (Development Plan) is to guide the physical development of the 200 Areas (which refers to the 200 East Area, 200 West Area, and 200 Area Corridor, located between the 200 East and 200 West Areas) in accordance with US Department of Energy (DOE) Order 4320.lB (DOE 1991a) by performing the following: Establishing a land-use plan and setting land-use categories that meet the needs of existing and proposed activities. Coordinating existing, 5-year, and long-range development plans and guiding growth in accordance with those plans. Establishing development guidelines to encourage cost-effective development and minimize conflicts between adjacent activities. Identifying site development issues that need further analysis. Integrating program plans with development plans to ensure a logical progression of development. Coordinate DOE plans with other agencies [(i.e., Washington State Department of Ecology (Ecology) and US Environmental Protection Agency (EPA)]. Being a support document to the Hanford Site Development Plan (DOE-RL 1990a) (parent document) and providing technical site information relative to the 200 Areas

  7. Defense Technology Area Plan.

    Science.gov (United States)

    1996-05-01

    Concepts for aircraft interior decon • Concepts for wide area/fixed site decon • Supercritical fluid-based decon for sensitive equipment; •Demo enzymatic ...and special purpose clothing; improved closure systems for ensembles; microencapsulated phase change materials for special purpose applications, and...development of microencapsulated phase change materials for heating and cooling in response to extreme temperature changes. Participants in this work are

  8. 190-C Facility <90 Day Storage Pad supplemental information to the Hanford facility contingency plan

    International Nuclear Information System (INIS)

    Little, N.C.

    1996-12-01

    The 190-C Facility <90 Day Storage Pad stores waste oils primarily contaminated with lead generated while draining equipment within the building of residual lubricating oils. Waste oils are packaged and stored in fifty-five gallon drums, or other containers permitted by the Site Specific Waste Management Instruction. Bechtel Hanford, Inc. (BHI) manual BHI-EE-02, Environmental Requirements Procedures, references this document. This document is to be used to demonstrate compliance with the contingency plan requirements in Washington Administrative Code, Chapter 173-303, Dangerous Waste Regulations, for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units (units). Refer to BHI-EE-02, for additional information

  9. Proposed energy conservation contingency plan: emergency restrictions on illuminated advertising and certain gas lighting. Economic impact analysis. Environmental impact assessment. Contingency plan No. 5

    Energy Technology Data Exchange (ETDEWEB)

    1976-09-01

    In the event of a severe energy supply disruption or in order to fulfill obligations of the U.S. under the International Energy Program, the President may implement one or more energy conservation contingency plans provided for in the Energy Policy and Conservation Act (EPCA) of 1975. This report describes the economic impact of restrictions on the use of illuminated advertising and certain gas lighting. The proposed plan would reduce demand for electricity and natural gas. The reduced demand for electricity would result in reduced demand for oil, natural gas, and other fuels used to generate electricity. Since oil and natural gas would be in short supply, the reduced use of these fuels in the generation of electricity could make supplies available to other industries. By contrast, the coal supply would not be affected by these conditions. However, the substitutability of coal for fuels in short supply (especially oil for electric generation) would tend to offset the impact of reduced demand for coal to generate electricity. Advertising expenditures would shift. Expenditures for illuminated outdoor signs would fall and expenditures for advertising in other media (e.g., radio, newspapers) would rise. No significant effect upon aggregate retail sales is anticipated. In summary, microeconomic effects of the measure are negligible and all effects are minor and/or beneficial. These effects are almost lost in the projected economic effects that would result from any severe supply interruption.

  10. Australian contingency plans for emergency animal disease control: the role of antigen/vaccine banks.

    Science.gov (United States)

    Tweddle, N E

    2004-01-01

    Vaccination is an important element of contingency plans for many animal diseases. The decision whether or not to use vaccine is complex, and must consider epidemiological, economic and social issues. Vaccines are rarely available in a country for emergency animal diseases unless a low pathogenicity strain of the agent is present or it is localised in carrier hosts. High quality commercial vaccine from overseas is often the preferred source of vaccine in an emergency, although less reliable sources may be used with additional safeguards. Alternatively, master seeds may be imported or developed for production within the country For contingency planning, diseases may be ranked according to the expected role of vaccine in the disease eradication strategy, with diseases for which vaccine is part of the initial response strategy receiving highest priority for action. A range of preparedness options is available, ranging from identifying producers of vaccine, obtaining permits for import and use from regulatory authorities, to establishing vaccine or antigen banks. Countries need to consider their individual situations and develop strategies to address the diseases of significance to them.

  11. 77 FR 30266 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford...

    Science.gov (United States)

    2012-05-22

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford Federal Direct Loan Program AGENCY: Federal Student Aid, Department of Education... announces the annual updates to the ICR plan formula for 2012. Under the William D. Ford Federal Direct Loan...

  12. 77 FR 20796 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford...

    Science.gov (United States)

    2012-04-06

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford Federal Direct Loan Program AGENCY: Federal Student Aid, Department of Education... announces the annual updates to the ICR plan formula for 2011. Under the William D. Ford Federal Direct Loan...

  13. A High Performance System With Explicit Incorporation of ATC Regulations to Generate Contingency Plans for UAVs with Lost Communication, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose a comprehensive and systematic contingency plan generation framework to deal with lost communication in UAVs. ATC regulations are explicitly incorporated...

  14. Contingency planning for oil spill response: A program of joint IMO/oil industry regional seminars

    International Nuclear Information System (INIS)

    Bavister, R.; Wonham, J.

    1993-01-01

    Cooperative efforts between the oil industry and governments at the national and local levels have resulted in a series of reports for both technical and general audiences on subjects relating to oil spills, as well as an ongoing series of government/industry regional seminars for senior executives. The seminars emphasize the crucial importance of joint government/industry attention to contingency planning. These activities, which are continuing, are organized under the auspices of an International Petroleum Industry Environmental Conservation Association working group, and the International Maritime Organization. Feedback is solicited from seminar participants for use in planning further seminars and to give the IMO a clear picture of follow up activities that have resulted from the seminars

  15. Contingency plan for the Lawrence Livermore National Laboratory, Site 300, hazardous waste operations

    International Nuclear Information System (INIS)

    Gonzalez, M.A.

    1983-01-01

    This contingency plan for hazardous waste release provides guidance for coordinating response efforts. With a goal to minimize hazards to human health and life; and protect livestock, wildlife, the environment, and property in the event of a fire, explosion, or any unplanned release of hazardous substances or mixtures to the air, water, or soil. In this document, hazardous waste includes all waste substances or mixtures that: contain any of the hazardous substances listed in the Resource Conservation and Recovery Act; have the characteristic of being toxic, flammable, reactive, corrosive, an irritant, and/or a strong sensitizer; are radioactive and are used in experiments at Site 300; or could have a significant effect on the environment. This Plan includes an overview of emergency response capabilities; and responsibilities assigned to both LLNL and non-LLNL emergency response personel

  16. Planning approaches for rurban areas

    DEFF Research Database (Denmark)

    Busck, Anne Gravsholt; Hidding, Marjan; Kristensen, Søren Bech Pilgaard

    2009-01-01

    ), Staffanstorp municipality (Sweden) and Werv-area (the Netherlands). All three areas belong to the rurban zone and are selected to exemplify pro-active planning. The analysis focuses on how the concept of compact city is perceived and implemented, how rurban areas are managed in order to avoid further urban...... encroachment, and how resilient green landscapes are ensured. The results reveal significant differences in approaches, reflecting variations in the public involvement in rurban areas development, the role of different administrative levels and the use of zonation. Variation in the use of zonation encapsulates...

  17. Resource Estimations in Contingency Planning for Foot-and-Mouth Disease

    Directory of Open Access Journals (Sweden)

    Anette Boklund

    2017-05-01

    Full Text Available Preparedness planning for a veterinary crisis is important to be fast and effective in the eradication of disease. For countries with a large export of animals and animal products, each extra day in an epidemic will cost millions of Euros due to the closure of export markets. This is important for the Danish husbandry industry, especially the swine industry, which had an export of €4.4 billion in 2012. The purposes of this project were to (1 develop an iterative tool with the aim of estimating the resources needed during an outbreak of foot-and-mouth disease (FMD in Denmark, (2 identify areas, which can delay the control of the disease. The tool developed should easily be updated, when knowledge is gained from other veterinary crises or during an outbreak of FMD. The stochastic simulation model DTU-DADS was used to simulate spread of FMD in Denmark. For each task occurring during an epidemic of FMD, the time and personnel needed per herd was estimated by a working group with expertise in contingency and crisis management. By combining this information, an iterative model was created to calculate the needed personnel on a daily basis during the epidemic. The needed personnel was predicted to peak within the first week with a requirement of approximately 123 (65–175 veterinarians, 33 (23–64 technicians, and 36 (26–49 administrative staff on day 2, while the personnel needed in the Danish Emergency Management Agency (responsible for the hygiene barrier and initial cleaning and disinfection of the farm was predicted to be 174 (58–464, mostly recruits. The time needed for surveillance visits was predicted to be the most influential factor in the calculations. Based on results from a stochastic simulation model, it was possible to create an iterative model to estimate the requirements for personnel during an FMD outbreak in Denmark. The model can easily be adjusted, when new information on resources appears from management of other crisis or

  18. State-of-the-art risk-based approach to spill contingency planning and risk management

    International Nuclear Information System (INIS)

    Schmidt Etkin, Dagmar; Reilly, Timothy; French McCay, Deborah

    2011-01-01

    The paper proposes incorporating a comprehensive examination of spill risk into risk management and contingency planning, and applying state-of-the-art modeling tools to evaluate various alternatives for appropriate spill response measures and optimize protective responses. The approach allows spill contingency planners and decision-makers to determine the types of spill scenarios that may occur in a particular location or from a particular source and calculate the probability distribution of the various scenarios. The spill probability information is useful in assessing and putting into perspective the various costs options for spill control systems that will be recommended ultimately. Using advanced modeling tools helps in estimating the potential environmental and socioeconomic consequences of each spill scenario based on location-specific factors over a range of stochastic possibilities, simulating spill scenarios and determining optimal responses and protection strategies. The benefits and costs of various response alternatives and variations in response time can be calculated and modeling tools for training and risk allocation/transfer purposes used.

  19. Effective communications system for a national oil spill contingency plan in Nigeria

    International Nuclear Information System (INIS)

    Adeyemi-Wilson, O.A.

    1991-01-01

    This paper describes what constitute an Effective Communications System for a National Oil Spill Contingency Plan. It discusses the system available in Nigeria for the oil exploration and producing companies, the Nigerian National Petroleum Corporation (NNPC) and the only oil spill response cooperative, the Clean Nigeria Associates (CNA). The Emergency Communications System which the companies had in place for some time, but is no longer functioning because of bureaucratic problems, is mentioned. The paper also mentioned the need to integrate the various separate systems already in use to provide effective communication for proper oil spill response. It recognizes the need for support from the Ministry of Communications and the two government agencies, NITEL and NET which provide telephone services in Nigeria. A proposed Effective Communications System for Nigeria is described

  20. Decision support tools for urban contingency policy: a scenario approach to risk management of the Vesuvio area in Naples, Italy

    NARCIS (Netherlands)

    Concilio, Grazia; Torrieri, Francesca

    2001-01-01

    Contingency management, in particular the management of unanticipated events outside the control of an ordinary planning system, has in the last 50years become an important andfrequently debated issue in the scientific literature on complex systems management underrisk conditions. The urban system

  1. 78 FR 33395 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013-William D. Ford...

    Science.gov (United States)

    2013-06-04

    ... DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013--William D. Ford Federal Direct Loan Program Catalog of Federal Domestic Assistance (CFDA) Number... free, at 1- 800-877-8339. SUPPLEMENTARY INFORMATION: Under the William D. Ford Federal Direct Loan...

  2. Analysis of the Contingency Contracting Support Plan within the Joint Planning Process Framework

    National Research Council Canada - National Science Library

    Anderson, Michael

    2003-01-01

    ...) flexibility and responsiveness. Current OPLANS at the Joint-level generally discuss how forces will be contractually supported in-theater, but are not specific enough within the framework of the Joint Planning Process (JPP...

  3. Hydrologic modeling as a tool for land management and contingency planning in the Calcasieu Sabine Basin. Volume 1

    International Nuclear Information System (INIS)

    Myers, J.; Meselhe, E.; Kheiashy, K.; Miller, R.; Douglas, C.

    2007-01-01

    The Calcasieu-Sabine Basin in southwest Louisiana contains approximately 126,518 hectares of wetlands, consisting of fresh marsh, intermediate marsh, brackish marsh and saline marsh. The hydrodynamics of the basin involves a combination of estuarine processes such as saltwater intrusion, response to water level fluctuations at an open boundary and lake dynamics. The basin is also affected by deep ship channels. As such, a robust, flexible and efficient numerical model is needed to incorporate all of these processes in an operational program. This study developed a hydrodynamic and salinity model for a portion of the basin that includes the lakes and marshes for the purpose of land management and contingency planning. The newly developed finite-difference hydrodynamic and salinity model is a combination of 1 and 2 dimensional computations and is intended for land, wildlife and habitat management. It can be used as a coastal restoration tool to evaluate the effectiveness of future and ongoing coastal restoration projects. The model was calibrated and validated against field measurements. It was shown to produce accurate simulations of the complex flow patterns of the Calcasieu-Sabine Basin along with information on salinity, water level fluctuations, velocities and discharges throughout the main channels and open water bodies within the area. It was concluded that the model provides a very useful planning and adaptive management tool to improve the understanding of the complex hydrology and salinity circulation pattern within the system. 5 refs., 4 tabs., 9 figs

  4. Contingency plan improvement for managing oil spills in the coastal waters of Thailand.

    Science.gov (United States)

    Singkran, Nuanchan

    2014-12-15

    The estimated risks of being impacted by oil spills in the coastal waters were used to improve the oil spill contingency plan of Thailand. Functional roles of local agencies are integrated into the plan. Intensive measures are suggested for the coastal provinces located in high-very high risk zones, whereas light and moderate measures are suggested for the coastal provinces located in low and moderate risk zones, respectively. The estimated percentage risks due to simulated oil slicks hitting the coast and/or important resources (PRoilspill) were used to guide the year-round water activities that should be carefully handled at a certain radius with a low-moderate PRoilspill, whereas they should be avoided at a certain radius with a high-very high PRoilspill. Important measures before, during, and post periods of an oil spill incident are suggested to prevent and monitor oil spill incidents and mitigate their impacts on the environment. Copyright © 2014 Elsevier Ltd. All rights reserved.

  5. Contingency planning for electronic health record-based care continuity: a survey of recommended practices.

    Science.gov (United States)

    Sittig, Dean F; Gonzalez, Daniel; Singh, Hardeep

    2014-11-01

    Reliable health information technology (HIT) in general, and electronic health record systems (EHRs) in particular are essential to a high-performing healthcare system. When the availability of EHRs are disrupted, alternative methods must be used to maintain the continuity of healthcare. We developed a survey to assess institutional practices to handle situations when EHRs were unavailable for use (downtime preparedness). We used literature reviews and expert opinion to develop items that assessed the implementation of potentially useful practices. We administered the survey to U.S.-based healthcare institutions that were members of a professional organization that focused on collaboration and sharing of HIT-related best practices among its members. All members were large integrated health systems. We received responses from 50 of the 59 (84%) member institutions. Nearly all (96%) institutions reported at least one unplanned downtime (of any length) in the last 3 years and 70% had at least one unplanned downtime greater than 8h in the last 3 years. Three institutions reported that one or more patients were injured as a result of either a planned or unplanned downtime. The majority of institutions (70-85%) had implemented a portion of the useful practices we identified, but very few practices were followed by all organizations. Unexpected downtimes related to EHRs appear to be fairly common among institutions in our survey. Most institutions had only partially implemented comprehensive contingency plans to maintain safe and effective healthcare during unexpected EHRs downtimes. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  6. A guide to contingency planning for oil spills on water. V. 2

    International Nuclear Information System (INIS)

    1997-01-01

    The movement of oil from the dominant production centres of the world to the world-wide market is primarily achieved by the use of tankers and pipelines. The global pattern of marine transport is well established as shown in Figure 1, below. While the environmental priority for all tanker operations is the prevention of spills, it is recognized that marine spills are a factor for which management must plan. This report, which is prepared for those managements in industry and government, describes the elements of the contingency planning process. It stresses the importance of cooperative activity between industry and government. It presents a consensus view of the IPIECA membership which is representative of the international oil industry. It reflects current informed thinking in the light of the extensive individual company and industry organization reviews that have taken place since the Exxon Valdez and other major incidents in 1989/90. This report has drawn freely on many of these reviews, some of which have been published. (UK)

  7. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  8. Carlsbad Area Office strategic plan

    International Nuclear Information System (INIS)

    1995-10-01

    This edition of the Carlsbad Area Office Strategic Plan captures the U.S. Department of Energy's new focus, and supercedes the edition issued previously in 1995. This revision reflects a revised strategy designed to demonstrate compliance with environmental regulations earlier than the previous course of action; and a focus on the selected combination of scientific investigations, engineered alternatives, and waste acceptance criteria for supporting the compliance applications. An overview of operations and historical aspects of the Waste Isolation Pilot Plant near Carlsbad, New Mexico is presented

  9. 216-A-29 Ditch supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-29 Ditch and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-A-29 Ditch is a surface impoundment that received nonregulated process and cooling water and other dangerous wastes primarily from operations of the Plutonium/Uranium Extraction Plant. Active between 1955 and 1991, the ditch has been physically isolated and will be closed. Because it is no longer receiving discharges, waste management activities are no longer required at the unit. The ditch does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 216-A-29 Ditch

  10. 216-U-12 Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-U-12 Crib and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-U-12 Crib is a landfill that received waste from the 291-U-1 Stack, 244-WR Vault, 244-U via tank C-5, and the UO 3 Plant. The crib pipeline was cut and permanently capped in 1988, and the crib has been backfilled. The unit will be closed under final facility standards. Waste management activities are no longer required at the unit. The crib does not present a significant hazard to adjacent units, personnel, or the environment. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 216-U-12 Crib

  11. 216-A-36B Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-36B Crib and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of the Washington Administrative Code, Chapter 173- 303 for certain Resource Conservation and Recovery Act of 1976 waste management units. The 216-A-36B Crib is a landfill that received ammonia scrubber waste from the 202-A Building (Plutonium/Uranium Extraction Plant) between 1966 and 1972. In 1982, the unit was reactivated to receive additional waste from Plutonium/Uranium Extraction operations. Discharges ceased in 1987, and the crib will be closed under final facility standards. Because the crib is not receiving discharges, waste management activities are no longer required. The crib does not present a significant hazard to adjacent units, personnel, or the environment. There is little likelihood that any incidents presenting hazards to public health or the environment would occur at the 216-A-36B Crib

  12. 105-DR Large Sodium Fire Facility Supplemental Information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-05-01

    This document is a unit-specific contingency plan for the 105-DR Large Sodium Fire Facility and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of Washington Administrative Code (WAC) 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units.The LSFF occupied the former ventilation supply fan room and was established to provide a means of investigating fire and safety aspects associated with large sodium or other metal alkali fires. The unit was used to conduct experiments for studying the behavior of molten alkali metals and alkali metal fires. This unit had also been used for the storage and treatment of alkali metal dangerous waste. Additionally, the Fusion Safety Support Studies programs sponsored intermediate-size safety reaction tests in the LSFF with lithium and lithium-lead compounds. The LSFF, which is a RCRA site, was partially clean closed in 1995 and is documented in 'Transfer of the 105-DR Large Sodium Fire Facility to Bechtel Hanford, Inc.' (BHI 1998). In summary, the 105-DR supply fan room (1720-DR) has been demolished, and a majority of the surrounding soils were clean-closed. The 117-DR Filter Building, 116-DR Exhaust Stack, 119- DR Sampling Building, and associated ducting/tunnels were not covered under this closure

  13. Contingency plans and successful response strategies for oil spills into rivers

    Energy Technology Data Exchange (ETDEWEB)

    Owens, Edward H. [Polaris Applied Sciences Inc., Bainbridge Island, WA (United States)]. E-mail: ehowens@polarisappliedsciences.com

    2003-07-01

    Oil spilled into a river enters a dynamic environment. An effective response can only succeed if the dynamics of the river system are understood and if the strategies and tactics are designed to match these conditions. Oil is transported downstream at the speed of the current, therefore, an estimate of the rate of movement is essential to identify effective intercept locations. Boom performance is affected by local surface water velocities as entrainment of oil typically begins when velocities exceed 0.4 m/s. However, boom configurations can be effective in current velocities as great as 2.5 m/s. Response operations can be successful if staging or control locations have been identified as part of contingency planning and if booms are deployed to take into account local surface current characteristics. Tracking and control of submerged or sunken oil is difficult and may not be practical. Recovery operations for sunken oil depend on the channel depth, current velocities, and on the distribution and concentration of the oil. (author)

  14. Using contingent choice methods to assess consumer preferences about health plan design.

    Science.gov (United States)

    Marquis, M Susan; Buntin, Melinda Beeuwkes; Kapur, Kanika; Yegian, Jill M

    2005-01-01

    American insurers are designing products to contain health care costs by making consumers financially responsible for their choices. Little is known about how consumers will view these new designs. Our objective is to examine consumer preferences for selected benefit designs. We used the contingent choice method to assess willingness to pay for six health plan attributes. Our sample included subscribers to individual health insurance products in California, US. We used fitted logistic regression models to explore how preferences for the more generous attributes varied with the additional premium and with the characteristics of the subscriber. High quality was the most highly valued attribute based on the amounts consumers report they are willing to pay. They were also willing to pay substantial monthly premiums to reduce their overall financial risk. Individuals in lower health were willing to pay more to reduce their financial risk than individuals in better health. Consumers may prefer tiered-benefit designs to those that involve overall increases in cost sharing. More consumer information is needed to help consumers better evaluate the costs and benefits of their insurance choices.

  15. A new wave-current online information system for oil spill contingency planning (WAVCIS)

    International Nuclear Information System (INIS)

    Stone, G.W.

    2001-01-01

    A Wave Current Information System (WAVCIS) for coastal Louisiana was presented. WAVCIS is an online oceanographic and meteorological observing system that provides many benefits to oil spill contingency planning. The system provides wave information such as wave height, period, direction of propagation, water level, surge, water column velocity profiles and meteorological conditions on a near real time basis. The information is gathered from several stations along Louisiana's coast in the Gulf of Mexico and is transmitted via cellular satellite telephone to a base station at Louisiana State University where it is then made available on the Internet. The database provides information regarding emergency response decision tools for agencies faced with decision making during storm threats or during coordination of an oil spill response operation. It also provides information needed for assisting operations support for offshore industries, commerce and trade. In addition, it can be used to obtain input boundary conditions for numerical modelling of surface and underwater oil and gas or mixtures of oil and gas. It was concluded that WAVCIS provides several benefits, including better cursory assessment of oil spill migration, precision numerical modeling of casts for oil spill trajectories, an important archived data set to assess trajectory modeling, and real-time environmental conditions for vessel operators using dispersants and in situ burning methods. 3 refs., 17 figs

  16. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2013-10-01

    Annex W plan may utilize strength, weakness, opportunity, threat ( SWOT ) and capability gap analysis techniques. The SWOT method allows the IPE to...accountability and performance, the authors contend that international military organizations will benefit by incorporating Phase Zero Contracting Operations...analytical areas, such as OPLAN analysis , logistics assessments, contracting, and similar professional disciplines. Of note, most organizations do

  17. Real-time laboratory exercises to test contingency plans for classical swine fever: experiences from two national laboratories.

    Science.gov (United States)

    Koenen, F; Uttenthal, A; Meindl-Böhmer, A

    2007-12-01

    In order to adequately and efficiently handle outbreaks of contagious diseases such as classical swine fever (CSF), foot and mouth disease or highly pathogenic avian influenza, competent authorities and the laboratories involved have to be well prepared and must be in possession of functioning contingency plans. These plans should ensure that in the event of an outbreak access to facilities, equipment, resources, trained personnel, and all other facilities needed for the rapid and efficient eradication of the outbreak is guaranteed, and that the procedures to follow are well rehearsed. It is essential that these plans are established during 'peace-time' and are reviewed regularly. This paper provides suggestions on how to perform laboratory exercises to test preparedness and describes the experiences of two national reference laboratories for CSF. The major lesson learnt was the importance of a well-documented laboratory contingency plan. The major pitfalls encountered were shortage of space, difficulties in guaranteeing biosecurity and sufficient supplies of sterile equipment and consumables. The need for a standardised laboratory information management system, that is used by all those involved in order to reduce the administrative load, is also discussed.

  18. 14 CFR 259.4 - Contingency plan for lengthy tarmac delays.

    Science.gov (United States)

    2010-01-01

    ... (AVIATION PROCEEDINGS) ECONOMIC REGULATIONS ENHANCED PROTECTIONS FOR AIRLINE PASSENGERS § 259.4 Contingency..., assurance that the air carrier will provide adequate food and potable water no later than two hours after... flights covered in paragraph (b)(2) of this section, and for the trigger point for food and water covered...

  19. 216-A-10 Crib supplemental information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-05-01

    This document is a unit-specific contingency plan for the 216-A-10 Crib. The Crib is a landfill that received process condensate from the 202-A building Plutonium/Uranium Extraction Plant from 1956 to 1987. The crib has not received waste since March 1987 and will be closed under final facility standards. Waste management activities are no longer required at the crib, and it does not present significant hazard to adjacent units, personnel or the environment. It is unlikely that any incidents presenting hazards to the public health or the environment would occur at the 216-A-10 Crib

  20. Science and Technology Business Area Strategic Plan

    National Research Council Canada - National Science Library

    Paul, Richard

    2000-01-01

    The S&T Business Area Strategic Plan has been updated to include lessons learned over the last two years, identifies areas that need to be reviewed further, addresses business opportunities and threats...

  1. An exploratory study of healthcare strategic planning in two metropolitan areas.

    Science.gov (United States)

    Begun, James W; Kaissi, Amer A

    2005-01-01

    Little is known about empirical variation in the extent to which healthcare organizations conduct formal strategic planning or the extent to which strategic planning affects performance. Structural contingency and complexity science theory offer differing interpretations of the value of strategic planning. Structural contingency theory emphasizes adaptation to achieve organizational fit with a changing environment and views strategic planning as a way to chart the organization's path. Complexity science argues that planning is largely futile in changing environments. Interviews of leaders in 20 healthcare organizations in the metropolitan areas of Minneapolis/St. Paul, Minnesota, and San Antonio, Texas, reveal that strategic planning is a common and valued function in healthcare organizations. Respondents emphasized the need to continuously update strategic plans, involve physicians and the governing board, and integrate strategic plans with other organizational plans. Most leaders expressed that strategic planning contributes to organizational focus, fosters stakeholder participation and commitment, and leads to achievement of strategic goals. Because the widespread belief in strategic planning is based largely on experience, intuition, and faith, we present recommendations for developing an evidence base for healthcare strategic planning.

  2. Contingency planning and risk analysis for water and tailings management at Ranger Uranium Mines

    International Nuclear Information System (INIS)

    McNally, P.E.

    1986-01-01

    This paper describes some of the more likely risks and contingency procedures associated with the extremely variable monsoonal climate of the Alligator Rivers region in the Northern Territory in relation to the Ranger Uranium Mine. The tailings management system is basically a large storage impoundment and a reticulation system that delivers tailings sludge and recycles supernatant water. It is a closed circuit within the water management system and is dealt with as an integral part of that system

  3. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  4. Engineering Task Plan for Tank 241-C-106 contingency chiller definitive design

    International Nuclear Information System (INIS)

    Rensink, G.E.; Kriskovich, J.R.

    1995-01-01

    This document identifies the scope, cost, schedule and responsible organizations for completing a design of a contingency ventilation inlet air cooling system for Tank 241-C-106. The air cooling system, described in Rensink (1995), consists of a chiller, cooling coils, and supporting equipment that, when installed will be capable of assuring that the waste temperatures in Tank 241-C-106 are maintained within acceptable limits for safe storage. The effort described herein is scheduled for completion by May 31, 1995 to support Performance Based Incentive (PBI) Milestone SI-2x

  5. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  6. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  7. Contingency plan for the Old Hydrofracture Facility tanks sluicing project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-10-01

    Lockheed Martin Energy Systems, Inc. (Energy Systems), plans to begin a sluicing (flushing) and pumping project to remove the contents from five inactive, underground storage tanks at the Old Hydrofracture Facility (OHF) at the Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. The tank contents will be transferred to the Melton Valley Storage Tanks, which are part of the active waste treatment system at ORNL. The purpose of the project is to minimize the risk of leaking the highly radioactive material to the environment. The five OHF tanks each contain a layer of sludge and a layer of supernatant. Based on a sampling project undertaken in 1995, the sludge in the tanks has been characterized as transuranic and mixed waste and the supernatants have been characterized as mixed waste. The combined radioactivity of the contents of the five tanks is approximately 29,500 Ci. This contingency plan is based on the preliminary design for the project and describes a series of potential accident/release scenarios for the project. It outlines Energy Systems' preliminary plans for prevention, detection, and mitigation. Prevention/detection methods range from using doubly contained pipelines to alarmed sensors and automatic pump cutoff systems. Plans for mitigation range from pumping leaked fluids from the built-in tank drainage systems and cleaning up spilled liquids to personnel evacuation

  8. Visits to Australia by nuclear powered or armed vessels: contingency planning for the accidental release of ionizing radiation

    International Nuclear Information System (INIS)

    1989-01-01

    The report refers to the adequacy of current contingency planning by the Australian Federal and Senate authorities to deal with the accidental release of ionizating radiation from visiting nuclear powered or armed vessels in Australian waters and ports. Much of the material was obtained in response to questions put in writing by the Senate Standing Committee to the Department of Defence, ANSTO and others. In addition, the report contains relevant information from Commonwealth documents as well as the Committee findings and recommendations. Issues considered include: types of visiting nuclear powered vessels, accident likelihood and consequences, differences between naval and land-based reactors, safety records. The persons or organizations who made submissions or appeared in all public hearings are listed in the appendixes, along with all visits to Australian ports by nuclear powered warships from 1976 to 1988

  9. Determinants of Willingness to Pay for an Urban Green Area: A Contingent Valuation Survey of College Students

    Directory of Open Access Journals (Sweden)

    Maria Bonaventura Forleo

    2015-06-01

    Full Text Available The aim of the study is to identify factors affecting young people’s willingness to pay (WTP for the conservation of an urban green area. A questionnaire survey, based on the Contingent Valuation method, was administered to a sample of students enrolled at the University of Molise (Italy. We examine the determinants of WTP for use and non-use values, visitors’ profiles, socioeconomic characteristics and environmental attitudes. We detect factors affecting WTP decisions through logistic regression analysis. Variables affecting the WTP differ from the environmental values and according to the visiting experience; socio-economic characteristics do not appear particularly significant; the main cause for zero bids is related to the perception of the green area as a public good. Our results highlight a growing tendency, in young generations, towards a more sustainable awareness, which we believe should be carefully nurtured through adequate policy instruments, so to enhance the quality of urban life.

  10. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  11. 300 Area Revitalization Project Management Plan

    International Nuclear Information System (INIS)

    Downey, H. D.

    1999-01-01

    The 300 Area Revitalization Team has been tasked with the responsibility to develop an integrated path forward for the 300 Area, as part of a commitment stemming from the 300 Area Disposition Workshop that was held on March 17, 1998. The integrated path forward that is needed must ensure that budget, schedule, and work scopes are complementary between the Programs that are involved in the 300Area. This Project Management Plan (PMP) defines the roles and responsibilities, and the overall approach, to development of a prioritized schedule for 300 Area activities that will achieve the end-state condition

  12. 78 FR 37741 - Approval and Promulgation of Implementation Plans; California; South Coast; Contingency Measures...

    Science.gov (United States)

    2013-06-24

    ... deliver: Marty Robin, Office of Air Planning (AIR- 2), U.S. Environmental Protection Agency Region 9, 75... INFORMATION CONTACT: Doris Lo, Air Planning Office (AIR-2), U.S. Environmental Protection Agency, Region 9... statute precludes a State from implementing such measures before they are triggered. See, e.g., LEAN v...

  13. Contingency Contracting within the Department of Defense: A Comparative Analysis

    National Research Council Canada - National Science Library

    McMillion, Chester

    2000-01-01

    .... The thesis compares and contrasts the regulations governing the contingency contracting operations, the organization structure, contingency contracting support plans, and the training requirements...

  14. 76 FR 51266 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2011-08-18

    ... which was selected in the ROD. The SDs hired M&S Ingenieria y Ciencia Asociados who prepared remedial... approved the Remedial Action Work Plan and M&S Ingenieria y Ciencia Asociados as the Settling Defendants...

  15. 300 Area Process Trenches Closure Plan

    International Nuclear Information System (INIS)

    Luke, S.N.

    1994-01-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the US Department of Energy, Richland Operations Office and has served as co-operator of the 300 Area Process Trenches, the waste management unit addressed in this closure plan. For the purposes of the Resource Conservation and Recovery Act, Westinghouse Hanford Company is identified as ''co-operator.'' The 300 Area Process Trenches Closure Plan (Revision 0) consists of a Resource Conservation and Recovery Act Part A Dangerous Waste Permit Application, Form 3 and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A Permit Application, Form 3 submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and six appendices. The 300 Area Process Trenches received dangerous waste discharges from research and development laboratories in the 300 Area and from fuels fabrication processes. This waste consisted of state-only toxic (WT02), corrosive (D002), chromium (D007), spent halogenated solvents (F001, F002, and F003), and spent nonhalogented solvent (F005). Accurate records are unavailable concerning the amount of dangerous waste discharged to the trenches. The estimated annual quantity of waste (item IV.B) reflects the total quantity of both regulated and nonregulated waste water that was discharged to the unit

  16. Contingency plan for the Old Hydrofracture Facility Tanks Sluicing Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-06-01

    This revised contingency plan addresses potential scenarios involving the release of radioactively contaminated waste from the Old Hydrofracture Facility Tanks Contents Removal project to the environment. The tanks are located at the Oak Ridge National Laboratory. The project involves sluicing the contents of the five underground tanks to mix the sludge and supernatant layers, and pumping the mixture to the Melton Valley Storage Tanks (MVST) for future processing. The sluicing system to be used for the project consists of a spray nozzle designated the open-quotes Borehole Miner,close quotes with an associated pump; in-tank submersible pumps to transfer tank contents from the sluice tanks to the recycle tank; high-pressure pumps providing slurry circulation and slurry transport to the MVST; piping; a ventilation system; a process water system; an instrumentation and control system centered around a programmable logic controller; a video monitoring system; and auxiliary equipment. The earlier version of this plan, which was developed during the preliminary design phase of the project, identified eight scenarios in which waste from the tanks might be released to the environment as a result of unanticipated equipment failure or an accident (e.g., vehicular accident). One of those scenarios, nuclear criticality, is no longer addressed by this plan because the tank waste will be isotopically diluted before sluicing begins. The other seven scenarios have been combined into three, and a fourth, Borehole Miner Failure, has been added as follows: (1) underground release from the tanks; (2) aboveground release or spill from the sluicing system, a tank riser, or the transfer pipeline; (3) release of unfiltered air through the ventilation system; and (4) Borehole Miner arm retraction failure. Methods for preventing, detecting, and responding to each release scenario are set out in the plan

  17. Temporal contingency

    Science.gov (United States)

    Gallistel, C.R.; Craig, Andrew R.; Shahan, Timothy A.

    2015-01-01

    Contingency, and more particularly temporal contingency, has often figured in thinking about the nature of learning. However, it has never been formally defined in such a way as to make it a measure that can be applied to most animal learning protocols. We use elementary information theory to define contingency in such a way as to make it a measurable property of almost any conditioning protocol. We discuss how making it a measurable construct enables the exploration of the role of different contingencies in the acquisition and performance of classically and operantly conditioned behavior. PMID:23994260

  18. Temporal contingency.

    Science.gov (United States)

    Gallistel, C R; Craig, Andrew R; Shahan, Timothy A

    2014-01-01

    Contingency, and more particularly temporal contingency, has often figured in thinking about the nature of learning. However, it has never been formally defined in such a way as to make it a measure that can be applied to most animal learning protocols. We use elementary information theory to define contingency in such a way as to make it a measurable property of almost any conditioning protocol. We discuss how making it a measurable construct enables the exploration of the role of different contingencies in the acquisition and performance of classically and operantly conditioned behavior. Copyright © 2013 Elsevier B.V. All rights reserved.

  19. Planning and management for health in periods of economic stringency and instability: a contingency approach.

    Science.gov (United States)

    van der Werff, A

    1986-01-01

    The mid-1970s marked the end of the longest period of uninterrupted economic growth in history, and initiated in Europe--and other parts of the world--a period of economic stagnation and instability. Along with the prosperity explosion of the past, the pattern of health problems has changed and is still changing. Moreover, the demand for health care has kept on rising, without much improvement of health status in general. Thus, there is a critical need to rethink policies, and to ensure that future changes occur within the limits of shrinking resources and the allotted time-span. In particular, the change in priorities envisaged by the Health for All 2000 (HFA 2000) strategies will need to take place against the background of an ageing population, social instability, and continuing development of new lifestyles and persistent economic scarcity. It is by analysing that background that this article seeks to make recommendations as to how health planning and management might successfully cope with the policy reorientation of the HFA 2000 strategy. The structure of this article is as follows. Firstly, the changes taking place in planning conditions will be reviewed, and form the basis of a framework for subsequent analysis of the planning environment. Following this framework, some of the conflicts likely to be faced in planning and management will be discussed, many of which are the consequence of economic stringency and instability. Also the requirements for an improvement of the effectiveness and efficiency of planning will be identified. Finally, a limited number of approaches to planning will be considered, for their appropriateness to the present-day economic circumstances. The point of view elucidated throughout is that there is no single solution which is 'best' under all circumstances. The conclusion, rather, is that the selection of particular theory or method of planning and management should depend both on the objectives of the decision maker and on the

  20. 75 FR 27464 - Special Reporting, Analysis and Contingent Resolution Plans at Certain Large Insured Depository...

    Science.gov (United States)

    2010-05-17

    ... FDIC is responsible for administering or enforcing. The FDIC also has authority to adopt regulations... strategies, strategies to mitigate systemic risks and overall planning for an orderly resolution in the..., describing means of preserving franchise value, maximizing recovery to creditors, and minimizing systemic...

  1. 100 area excavation treatability test plan

    International Nuclear Information System (INIS)

    1993-05-01

    This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Development and screening of remedial alternatives for the 100 Area, using existing data, have been completed and are documented in the 100 Area Feasibility Study, Phases 1 and 2 (DOE-RL 1992a). Based on the results of the FS, the Treatability Study Program Plan (DOE-RL 1992b) identifies and prioritizes treatability studies for the 100 Area. The data from the treatability study program support future focused FS, interim remedial measures (IRM) selection, operable unit final remedy selection, remedial design, and remedial actions. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992b). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications

  2. 10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans

    Science.gov (United States)

    2010-01-01

    ... area, or material access area; material control or material accounting indications of material missing... of the physical security and accounting system hardware that influence how the licensee will respond... assigned in a manner that precludes conflict in duties or responsibilities that would prevent the execution...

  3. 33 CFR 154.1030 - General response plan contents.

    Science.gov (United States)

    2010-07-01

    ... and health plan. (vi) List of acronyms and definitions. (vii) A geographic-specific appendix for each... the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (40 CFR part 300) and the Area Contingency Plan(s) (ACP) covering the area in which the facility operates. Facility owners or...

  4. LMHC/TWRS year 2000 equipment project renovation and contingency plan

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A program has been completed to assess, renovate and document tank farm field equipment year 2000 compliance. A communication plan has also been prepared (see section 8.0). The objective of the program was to assure that no adverse effects occur in tank farm operations as a result of equipment malfunction due to the advent of year 2000. The purposes of this document are to: describe the process used to assess field equipment; document items found to be compliant; document items found to be non-compliant including options for making the equipment year 2000 functional and/or tolerant; describe location and management of field equipment year 2000 documentation; assess overall vulnerability of TWRS field equipment with regard to year 2000 problems and describe plans to communicate year 2000 equipment review results and corrective actions

  5. 241-CX-70, 241-CX-71, and 241-CX-72 underground storage tanks at the strontium semiworks facility supplemental information to the Hanford Facility Contingency Plan

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-03-01

    This document is a unit-specific contingency plan for the underground storage tanks at the Strontium Semiworks Facility and is intended to be used as a supplement to the Hanford Facility Contingency Plan. This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of WAC 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units. Radioactive material is contained in three underground storage tanks: 241-CX-70, 241-CX-71, and 241-CX-72. Tank 241-CX-70 has been emptied, except for residual quantities of waste, and has been classified as an elementary neutralization tank under the RCRA. Tanks 241-CX-71 and 241-CX-72 contain radioactive and Washington State-only dangerous waste material, but do not present a significant hazard to adjacent facilities, personnel, or the environment. Currently, dangerous waste management activities are not being applied at the tanks. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the Strontium Semiworks Facility

  6. Risk management and contingency planning for year 2000 - key business decisions for the success of an organization

    International Nuclear Information System (INIS)

    McNeil, J.L.

    1998-01-01

    Factors that transformed Y2K, initially considered as primarily a computer problem, into a business problem are outlined. For example, many organizations have prioritized their inventory of information technology (IT) systems, but few have prioritized their suppliers or customers, or have even thought of what will happen if they cannot get products, or cannot get paid by their customers. Estimates at this time reveal that approximately 30 per cent of businesses will not be operational. This presents a significant risk to any organisation's bottom line. Add to this the status of the world as a whole, where other than about 12 major countries, the majority has not even began to remediate their Y2K problems, and we begin to get a true picture of the potential of major communications problems with subsidiaries, partners or suppliers. Consideration of these factors make it easy to see how Y2K is potentially a major business problem. Because of these risks, it is strongly urged that organizations perform risk management and contingency planning. An example of a risk management approach is presented

  7. Reduction of radiation area project plan

    International Nuclear Information System (INIS)

    1979-08-01

    This plan deals with the overall reduction of outdoor surface radiation areas under Rockwell's jurisdiction. Four basic alternatives are identified which will reduce and/or stabilize radiation areas until long-term disposal decisions are made: (1) continued routine surveillance and maintenance; (2) reduction or elimination of effluent discharges; (3) improved site stabilization; and (4) site removal. The four major transport mechanisms at Hanford that are the primary forces for contamination spread are identified as wind, animal transport, concentration and dispersal by plants, and transport resulting from human activities

  8. Resource Estimations in Contingency Planning for Foot-And-Mouth Disease

    DEFF Research Database (Denmark)

    Boklund, Anette; Sten, Mortensen; Holm Johansen, Maren

    Preparedness planning for a veterinary crisis is important to be fast and effective in the eradication of disease. For countries with a large export of animals and animal products, each extra day in an epidemic will cost millions of euros due to the closure of export markets. This is important....... It was estimated that the need for personnel would peak on day 7 with a requirement of approximately 170 veterinarians, 70 technicians and 45 administrative staff. However, the need for personnel in the Danish Emergency Management Agency (responsible for the hygiene barrier and initial cleaning and disinfection...

  9. 75 FR 26131 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List

    Science.gov (United States)

    2010-05-11

    ... included installation of fences, air and soil sample collection, decontamination of the residences, and... 1986 and completed in 1987. The primary contaminant of concern was asbestos. Soil borings and... following: (1) Installation of a two-foot soil cover on areas of exposed or minimally covered asbestos; (2...

  10. 77 FR 67777 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-11-14

    ... vegetable pickling waste, apple pulp, digester sludge, barrels of spent extracts, brine, the dewatering of... Michigan in Ottawa County. The Site consists of a site entrance, former lagoon area, dewatering lagoons... Company as a municipal garbage dump, liquid waste dewatering facility, and headquarters for its hauling...

  11. 78 FR 45064 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2013-07-26

    ... Group'') in June1988. The PRP Group removed the bulk contents of an underground tank, a septic tank, 3... contaminated groundwater prevent exposure to contaminants in the buildings, aboveground and underground tanks... water in the wet area prevent future wetlands contamination from surface water runoff and discharge...

  12. 75 FR 48867 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2010-08-12

    ... contaminated areas at the Rogers Road Site; Covering soil, debris and water meeting the criteria stated below... water. The grass cover was well-established and provided thorough coverage of the soil cover. The site... and soil cover to ensure it no longer presents a threat to human health or the environment. Eliminate...

  13. Identification of Decision Support Concepts for the Planning of Air Force Immediate Contingencies Operations

    Science.gov (United States)

    2010-03-01

    Richmond received severe damage because of soil 120 DRDC Valcartier CR 2010-353 conditions. Dikes were broken in the Richmond area and to...designed to be operat ional and st rategic) and all executed step by step but Department of enviroments (army, navy, concurrent activit ies and

  14. 77 FR 43529 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Science.gov (United States)

    2012-07-25

    ... health and the environment, which may result if the contamination associated with the Dix Area Sanitary... media (air, surface water, sediment, soil, and groundwater). During the evaluation of site risks...- dichloroethylene, 1,1,1-trichloroethane, ethylbenzene, nickel, mercury, cadmium, zinc, chromium, and manganese...

  15. 75 FR 53222 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List

    Science.gov (United States)

    2010-08-31

    ... 8 a.m.-4 p.m., Monday through Friday by appointment only; or, Thomas Public Library, 315 Martin... Powersville, Georgia, occupies approximately 15 acres in a predominantly rural area. From the early 1940s to... shown on the following tables. The cleanup goals for surface water were considered to be the same as...

  16. Incorporating creditors' seniority into contingent claim models: Applicarion to peripheral euro area countries

    OpenAIRE

    Gómez-Puig, Marta; Singh, Manish Kumar; Sosvilla Rivero, Simón, 1961-

    2018-01-01

    This paper highlights the role of multilateral creditors (i.e., the ECB, IMF, ESM etc.) and their preferred creditor status in explaining the sovereign default risk of peripheral euro area (EA) countries. Incorporating lessons from sovereign debt crises in general, and from the Greek debt restructuring in particular, we define the priority structure of sovereigns' creditors that is most relevant for peripheral EA countries in severe crisis episodes. This new priority structure of creditors, t...

  17. Contingency planning and emergency response in construction activities: Training the construction worker

    International Nuclear Information System (INIS)

    Jones, E.

    1987-01-01

    Construction activities have the potential for environmental and/or health impacts at Oak Ridge National Laboratory (ORNL) particularly as site cleanup and restoration plans are initiated. ORNL has instituted special training for all construction workers and related contractors. Individuals learn how construction activities at ORNL can potentially have adverse effects on the environment and their health, and to learn how to respond to potential chemical and radiation hazards. Workers are given a review of basic information on radiation and chemicals in a framework that emphasizes the situations in which workers or the environment may be exposed to potential risk. Specific instructions are presented on what to do when contamination is suspected, with identification of emergency procedures and response personnel. 5 refs., 1 fig

  18. Approach to downstream planning for nearshore response and sensitive areas protection outside Prince William Sound, Alaska

    International Nuclear Information System (INIS)

    DeCola, E.G.; Robertson, T.L.; Robertson, R.; Banta, J.

    2004-01-01

    This study assessed the need for an oil spill response plan for downstream coastal communities that could be affected by oil spilled from tankers travelling in Prince William Sound, Alaska. For the purpose of oil spill contingency planning, the State of Alaska has been divided into the Kodiak and Cook Inlet sub-areas that are at risk for downstream impacts from a Prince William Sound oil spill. The 1989 Exxon Valdez oil spill provided an example of a worst-case scenario oil spill from a tanker in Prince William Sound, but the oil spill planning system that has evolved in Alaska does not adequately plan for on oil spill that originates in one sub-area of the state, but impacts other sub-areas in the downstream spill path. This study analyzed the gaps that exist in the current response planning system in the Prince William Sound, Cook Inlet and Kodiak sub-areas. A method was proposed to improve the existing response plans so that emergency response teams are better prepared to manage cross-boundary oil spills originating in Prince William Sound. The proposed method focuses on nearshore response and sensitive areas protection for coastlines and communities that are at risk for oil spills from a tanker travelling the Trans-Alaska Pipeline System (TAPS). 11 refs., 3 figs

  19. Mixed Waste Focus Area program management plan

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal

  20. Planning urban megaprojects in the Gulf: The international consultancy firms in urban planning between global and contingent

    Directory of Open Access Journals (Sweden)

    Oula Aoun

    2016-06-01

    Full Text Available Driven by globalization and market openings, many architecture and engineering firms have become global. By focusing on the urban megaprojects in the Gulf, a particular cultural and political context, this paper argues that such firms have a major role in the rapid urban transformation of Gulf countries and act as transfer agents of an international knowledge in the urban planning domain. However, the transfer is adapted by several context-related characteristics, such as local governance, urban knowledge, and regulatory framework. This paper explores the procedural adaptation of these firms to the Gulf Cooperation Council (GCC in terms of internal structure, methodology, adopted tools, and interaction with the context. The level of learning that results from this transfer is also investigated.

  1. PETROBRAS Transportes (TRANSPETRO) contingency plan system; Metodologia SIE (Sistema Informatizado de Emergencia) aplicada no gerenciamento das contingencias

    Energy Technology Data Exchange (ETDEWEB)

    Berardinelli, Ricardo; Mendonca, Daniela [TRANSPETRO - PETROBRAS Transportes, Rio de Janeiro, RJ (Brazil). Coordenacao de Seguranca, Saude e Meio Ambiente de Dutos e Terminais; Morais, Lucia B.; Carvalho, Marcelo Tilio M. de [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil). Dept. de Informatica. Grupo de Tecnologia em Computacao Grafica (TECGRAF)

    2005-07-01

    This paper describes the PETROBRAS Transportes Emergency Response System, which was designed to improve the response to emergency situations. The plans are defined based on an evaluation of the organization of the emergency teams, the communication procedures, characterization of the installations, definition of accidental scenarios, environmental sensitivity maps; simulation of oil spill trajectories and dispersion behavior; geographical data of the area surrounding the installations; other conventional data related to the installations, including equipment available and the InfoPAE system. Plans include several scenarios as oil spills, gas, fire, explosion, hazardous materials which can be applied to terminals and pipelines. (author)

  2. 300 Area Process Trenches Postclosure Plan

    International Nuclear Information System (INIS)

    Badden, J.W.

    1998-05-01

    The 300 Area Process Trenches (300 APT) certified closure under a modified closure option and in compliance with Condition II.K.3 oft he Hartford Facility Dangerous Waste Permit (Penit) (Ecology 1994). Modified closure has been determined to be the appropriate closure option for this unit due to groundwater that remains contaminated from past operations at the 300 APT. Corrective actions required for dangerous waste constituents remaining in groundwater will occur pursuant to the 300 APT Resource Conservation and Recovery Act (RCRA) Final Status Facility Ground Water Monitoring Plan, the Hanford Site Wide Dangerous Waste Permit, and in conjunction with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) remedial actions at the 300-FF-5 Groundwater Operable Unit (OU) pursuant to the Record of Decision (ROD) (EPA 1996). This postclosure plan identifies the modified closure actions required at the unit under postclosure care. It contains a description of the unit, past closure actions, and postclosure care requirements subject to compliance under the Permit (condition II.K.3)

  3. 100 Area excavation treatability test plan

    International Nuclear Information System (INIS)

    1993-08-01

    This test plan documents the requirements for a treatability study on field radionuclide analysis and dust control techniques. These systems will be used during remedial actions involving excavation. The data from this treatability study will be used to support the feasibility study (FS) process. Excavation is one of the high-priority, near-term, treatability study needs identified in the program plan (DOE-RL 1992f). Excavation of contaminated soils and buried solid wastes is included in several of the alternatives identified in the 100 Area FS. Although a common activity, excavation has only been used occasionally at the Hanford Site for waste removal applications. The most recent applications are excavation of the 618-9 burial ground and partial remediation of the 316-5 process trenches (DOE-RL 1992a, 1992b). Both projects included excavation of soil and dust control (using water sprays). Excavation is a well-developed technology and equipment is readily available; however, certain aspects of the excavation process require testing before use in full-scale operations. These include the following: Measurement and control of excavation-generated dust and airborne contamination; verification of field analytical system capabilities; demonstration of soil removal techniques specific to the 100 Area waste site types and configurations. The execution of this treatability test may produce up to 500 yd 3 of contaminated soil, which will be used for future treatability tests. These tests may include soil washing with vitrification of the soil washing residuals. Other tests will be conducted if soil washing is not a viable alternative

  4. Future Contingents

    DEFF Research Database (Denmark)

    Øhrstrøm, Peter; Hasle., Per F. V.

    2015-01-01

    contingent statements. The problem of future contingents is interwoven with a number of issues in theology, philosophy, logic, semantics of natural language, computer science, and applied mathematics. The theological issue of how to reconcile the assumption of God's foreknowledge with the freedom and moral...... accountability of human beings has been a main impetus to the discussion and a major inspiration to the development of various logical models of time and future contingents. This theological issue is connected with the general philosophical question of determinism versus indeterminism. Within logic, the relation...... about the future. Finally, it should be mentioned that temporal logic has found a remarkable application in computer science and applied mathematics. In the late 1970s the first computer scientists realised the relevance of temporal logic for the purposes of computer science (see Hasle and Øhrstrøm 2004)....

  5. Future Contingents

    DEFF Research Database (Denmark)

    Øhrstrøm, Peter; Hasle., Per F. V.

    2011-01-01

    contingent statements. The problem of future contingents is interwoven with a number of issues in theology, philosophy, logic, semantics of natural language, computer science, and applied mathematics. The theological issue of how to reconcile the assumption of God's foreknowledge with the freedom and moral...... accountability of human beings has been a main impetus to the discussion and a major inspiration to the development of various logical models of time and future contingents. This theological issue is connected with the general philosophical question of determinism versus indeterminism. Within logic, the relation...... about the future. Finally, it should be mentioned that temporal logic has found a remarkable application in computer science and applied mathematics. In the late 1970s the first computer scientists realised the relevance of temporal logic for the purposes of computer science (see Hasle and Øhrstrøm 2004)....

  6. 78 FR 54835 - Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead...

    Science.gov (United States)

    2013-09-06

    ... 4] Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead... Troy 2008 Lead nonattainment area (hereafter referred to as the ``Troy Area'' or ``Area''). The Troy... submittal regarding the attainment plan based on Alabama's attainment demonstration for the Troy Area. The...

  7. Informal Planning in Depopulating Rural Areas : A resource-based view on informal planning practices

    NARCIS (Netherlands)

    Syssner, Josefina; Meijer, M.

    2017-01-01

    Planning research has increasingly recognised that planning in depopulating areas differs from planning in growth areas. Several studies have sought to identify planning theories and strategies that are capable of meeting the challenges presented by depopulating areas. However, most of these studies

  8. 100 Area soil washing treatability test plan

    International Nuclear Information System (INIS)

    1993-03-01

    This test plan describes specifications, responsibilities, and general methodology for conducting a soil washing treatability study as applied to source unit contamination in the 100 Area. The objective ofthis treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. The purpose of separating these fractions is to minimize the volume of soil requiring permanent disposal. It is anticipated that this treatability study will be performed in two phases of testing, a remedy screening phase and a remedy selection phase. The remedy screening phase consists of laboratory- and bench-scale studies performed by Battelle Pacific Northwest laboratories (PNL) under a work order issued by Westinghouse Hanford Company (Westinghouse Hanford). This phase will be used to provide qualitative evaluation of the potential effectiveness of the soil washing technology. The remedy selection phase, consists of pilot-scale testing performed under a separate service contract to be competitively bid under Westinghouse Hanford direction. The remedy selection phase will provide data to support evaluation of the soil washing technology in future feasibility studies for Interim Remedial Measures (IRMs) or final operable unit (OU) remedies. Performance data from these tests will indicate whether applicable or relevant and appropriate requirements (ARARs) or cleanup goals can be met at the site(s) by application of soil washing. The remedy selection tests wig also allow estimation of costs associated with implementation to the accuracy required for the Feasibility Study

  9. Study of the Model of Activating Contingency Plans within Disruptive Incidents by Stages%突发事件下分阶段启动应急预案模型研究

    Institute of Scientific and Technical Information of China (English)

    于辉; 江智慧

    2011-01-01

    经前期处置下,研究管理者面对突发事件应该何时启动前期处置方案和应急预案的问题.在完全没有突发事件持续时阎信息的条件下,利用局内决策理论与方法构建了企业何时启动前期处置方案和应急预案的分阶段启动模型,并利用"竞争比"说明该方案的有效性.在此基础上,进一步通过数值分析表明分阶段启动应急预案的重要意义.%The increased number of natural disasters has disrupted social and economic progress. Minimizing the impact of these disasters can bring stability to society. Emergency response systems have played an important role in achieving this goal. Since the "SARS" crisis in the year 2003, China has begun to focus on building emergency response systems. A national contingency plan system was established in 2004 according to the "Classification" rule. China initially formed a main emergency plan system,constituted by national overall emergency response plans, specific contingency plans, department emergency plans, local emergency plans, and contingency plans for enterprises with large-scale activities.Existing literature has focused on the importance of contingency plans, the assessment of contingency plans, and approaches to improving emergency preparedness. Few studies have addressed problems associated with the activation of contingency plans when the public administration is disrupted by natural disasters. This paper investigates how managers activate contingency plans at the predisposal stage and potential problems that may arise from disruption by natural disasters at this stage. Case studies are conducted and our analysis results show that activating contingency plans at the pre-disposition stage is effective at dealing with public crises caused by natural disasters. A mathematical model is constructed to provide information on when to activate contingency plans in different phases.Decision theories and methods are used to help propose an

  10. Public accountability in planning for new housing areas

    NARCIS (Netherlands)

    Kang, V.; Korthals Altes, W.K.

    2015-01-01

    Planning new housing areas involves balancing many interests and local authorities must make decisions in a way that is accountable. Formal accountability is organised differently in plan-led and development-led planning systems. In plan-led systems, accountability relates to the question of whether

  11. Evaluating the role of collaborative planning in BC's Parks and Protected Areas Management Planning process

    OpenAIRE

    Ronmark, Tracy

    2005-01-01

    BC's protected areas system has recently doubled in size as a result of land use planning across the province. Managing protected areas to meet many goals requires thoughtful planning that involves stakeholder participation and dispute resolution through the plan development and implementation stages. This research identifies the best practices for planning and evaluates protected areas management planning processes based on those criteria. Evaluative criteria were developed from a literature...

  12. 78 FR 7340 - Approval and Promulgation of Implementation Plans; Idaho: Sandpoint PM10 Nonattainment Area...

    Science.gov (United States)

    2013-02-01

    ... particles can affect the heart and lungs and cause serious health effects. People with heart or lung... that contingency measures take effect if an area fails to meet RFP requirements or fails to attain the...

  13. Kirtland's Warbler Wildlife Management Area Comprehensive Conservation Plan

    Data.gov (United States)

    Department of the Interior — The Comprehensive Conservation Plan (CCP) for Kirtland’s Warbler Wildlife Management Area (WMA) was signed on September 10, 2009, completing a planning process that...

  14. 7 CFR 1940.959 - Area plan.

    Science.gov (United States)

    2010-01-01

    ..., and time lines based on a realistic assessment of the area, including, but not limited to, the... possibilities for industrial recruitment in the area; (5) The potential for development of tourism in the area... expansion of existing businesses; and (7) The potential to produce value-added agricultural products in the...

  15. Geographic Response Information Network : a new tool to manage community information for oil spill contingency planning and response operations

    Energy Technology Data Exchange (ETDEWEB)

    Munger, M.; Bryant, T. [Cook Inlet Regional Citizen' s Advisory Council, Kenai, AK (United States); Haugstad, E.; Kwietniak, J. [Tesora Alaska Petroleum, Kenai, AK (United States); DeCola, E.; Robertson, T. [Nuka Research and Planning Group, Seldovia, AK (United States)

    2006-07-01

    This paper described the Geographic Response Information Network (GRIN) project which was launched to address some of the logistical challenges that often complicate oil spill and emergency response operations. The objective of the project was to develop a computer-based tool for incident logistics to organize maps and data related to oil spills, safety, public relations and basic community resources. In addition to its use for oil spill response planning, the data available can be useful for all-hazards emergency response planning. Early prototypes of the GRIN used PowerPoint slides to organize basic information about coastal communities in Alaska. With time, hyper text markup language (html) was used as the programming format because it can be more readily hyper-linked. Currently, GRIN is organized as a web page with the following 5 categories of information: general, liaison, public information, logistics and safety. There are several sub-headings under each category, such as location, people, economy, subsistence and transportation. This general information allows incident management personnel to obtain a community profile to better understand the cultural, social and economic basis of the community. The GRIN prototype was developed for the Kodiak urban area, but it may be expanded in the future to include other coastal communities in Alaska. 3 refs., 6 figs.

  16. Geographic Response Information Network : a new tool to manage community information for oil spill contingency planning and response operations

    International Nuclear Information System (INIS)

    Munger, M.; Bryant, T.; Haugstad, E.; Kwietniak, J.; DeCola, E.; Robertson, T.

    2006-01-01

    This paper described the Geographic Response Information Network (GRIN) project which was launched to address some of the logistical challenges that often complicate oil spill and emergency response operations. The objective of the project was to develop a computer-based tool for incident logistics to organize maps and data related to oil spills, safety, public relations and basic community resources. In addition to its use for oil spill response planning, the data available can be useful for all-hazards emergency response planning. Early prototypes of the GRIN used PowerPoint slides to organize basic information about coastal communities in Alaska. With time, hyper text markup language (html) was used as the programming format because it can be more readily hyper-linked. Currently, GRIN is organized as a web page with the following 5 categories of information: general, liaison, public information, logistics and safety. There are several sub-headings under each category, such as location, people, economy, subsistence and transportation. This general information allows incident management personnel to obtain a community profile to better understand the cultural, social and economic basis of the community. The GRIN prototype was developed for the Kodiak urban area, but it may be expanded in the future to include other coastal communities in Alaska. 3 refs., 6 figs

  17. Protected areas system planning and monitoring

    NARCIS (Netherlands)

    Vreugdenhil, D.

    2003-01-01

    The Vth World Parks Congress to be held in Durban, South Africa, September 8-17, 2003 will evaluate progress in protected areas conservation and stipulate strategic policies for the coming decade. Most countries of the world have at least a collection of protected areas, and have signed the

  18. Contingency proportion systematically influences contingency learning.

    Science.gov (United States)

    Forrin, Noah D; MacLeod, Colin M

    2018-01-01

    In the color-word contingency learning paradigm, each word appears more often in one color (high contingency) than in the other colors (low contingency). Shortly after beginning the task, color identification responses become faster on the high-contingency trials than on the low-contingency trials-the contingency learning effect. Across five groups, we varied the high-contingency proportion in 10% steps, from 80% to 40%. The size of the contingency learning effect was positively related to high-contingency proportion, with the effect disappearing when high contingency was reduced to 40%. At the two highest contingency proportions, the magnitude of the effect increased over trials, the pattern suggesting that there was an increasing cost for the low-contingency trials rather than an increasing benefit for the high-contingency trials. Overall, the results fit a modified version of Schmidt's (2013, Acta Psychologica, 142, 119-126) parallel episodic processing account in which prior trial instances are routinely retrieved from memory and influence current trial performance.

  19. Analyzing Contingency Contracting Purchases for Operation Iraqi Freedom (Unrestricted Version)

    National Research Council Canada - National Science Library

    Baldwin, Laura H; Ausink, John A; Campbell, Nancy F; Drew, John G; Roll, Jr, Charles R

    2008-01-01

    ...) in an effort to determine the size and extent of contractor support, and how plans for and the organization and execution of contingency contracting activities might be improved so that Contingency...

  20. Application of operational contingency analysis as a tool to reduce loss in the energy and utility area; Aplicacao da analise de contingencia operacional como ferramenta de minimizacao de perdas na area de energia e utilidades

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Adriano Francisco dos; Alvarenga, Zenilton Galhano; Grijo, Fabio Becalli [ArcelorMittal Tubarao, ES (Brazil). Dept. de Producao de Gusa e Energia

    2009-11-01

    All new implementation of activities and equipment needs special attention regarding programming, preparation and operations performance, service and necessary interventions in order to achieve success considering operation, safety and environment. The real challenge in order to realize this change is to guarantee for the costumers the minimum interference, once it is performed on an operational routine basis. The energy distribution area from ArcelorMittal Tubarao (IGC-D) has a very important operational tool to succeed on this task: the operational contingency analysis. The objective of this paper is showing how the operational contingency analysis has been used as a tool to help IGC-D operation on preventing interruptions on supplying the internal costumers as well as keeping the maximum efficiency at the plant. (author)

  1. Facility effluent monitoring plan determinations for the 400 Area facilities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-09-01

    This Facility Effluent Monitoring Plan determination resulted from an evaluation conducted for the Westinghouse Hanford Company 400 Area facilities on the Hanford Site. The Facility Effluent Monitoring Plan determinations have been prepared in accordance with A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans. Two major Westinghouse Hanford Company facilities in the 400 Area were evaluated: the Fast Flux Test Facility and the Fuels Manufacturing and examination Facility. The determinations were prepared by Westinghouse Hanford Company. Of these two facilities, only the Fast Flux Test Facility will require a Facility Effluent Monitoring Plan. 7 refs., 5 figs., 4 tabs

  2. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  3. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  4. Strategic planning in Brazilian protected areas: Uses and adjustments.

    Science.gov (United States)

    Barreto, Cristiane Gomes; Drummond, José Augusto L

    2017-09-15

    Management plans for protected areas commonly use strategic planning tools in their drafting. It is proposed that the adequate use of the instruments of planning and management of protected areas can improve their strategic competitiveness, providing greater financial and administrative independence, enabling them to be economically sustainable organizations. This study evaluated the application of concepts and strategy formulation, strategy principles and competitiveness, organizational diagnosis, strategic maps, scenarios, and other strategic planning instruments used for conservation management in Brazil. 25 management plans of 25 different protected areas were selected and studied, with special attention to the indicators used in each plan. Results indicate that there is a high suitability for the application of SP tools to the universe of protected areas, although management plans did not take full advantage of these tools. We also found that the broader use of these tools did not guarantee greater managerial effectiveness. We suggest that other governance variables beyond planning strategies must be improved, to ensure a better performance of protected areas. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. Planning of Low-rise Urban Housing Areas

    DEFF Research Database (Denmark)

    Svensson, O.

    In many countries industrialization of house building has led to the building of large, monotonous housing areas with high-rise construction. In Denmark, however, smaller, varied housing areas with low-rise construction and urban features have become predominant. This report contains guidelines...... for the planning of such housing areas....

  6. Facility effluent monitoring plan determinations for the 200 Area facilities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-11-01

    The following facility effluent monitoring plan determinations document the evaluations conducted for the Westinghouse Hanford Company 200 Area facilities (chemical processing, waste management, 222-S Laboratory, and laundry) on the Hanford Site in south central Washington State. These evaluations determined the need for facility effluent monitoring plans for the 200 Area facilities. The facility effluent monitoring plan determinations have been prepared in accordance with A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438 (WHC 1991). The Plutonium/Uranium Extraction Plant and UO 3 facility effluent monitoring plan determinations were prepared by Los Alamos Technical Associates, Richland, Washington. The Plutonium Finishing Plant, Transuranic Waste Storage and Assay Facility, T Plant, Tank Farms, Low Level Burial Grounds, and 222-S Laboratory determinations were prepared by Science Applications International Corporation of Richland, Washington. The B Plant Facility Effluent Monitoring Plan Determination was prepared by ERCE Environmental Services of Richland, Washington

  7. Walking path-planning method for multiple radiation areas

    International Nuclear Information System (INIS)

    Liu, Yong-kuo; Li, Meng-kun; Peng, Min-jun; Xie, Chun-li; Yuan, Cheng-qian; Wang, Shuang-yu; Chao, Nan

    2016-01-01

    Highlights: • Radiation environment modeling method is designed. • Path-evaluating method and segmented path-planning method are proposed. • Path-planning simulation platform for radiation environment is built. • The method avoids to be misled by minimum dose path in single area. - Abstract: Based on minimum dose path-searching method, walking path-planning method for multiple radiation areas was designed to solve minimum dose path problem in single area and find minimum dose path in the whole space in this paper. Path-planning simulation platform was built using C# programming language and DirectX engine. The simulation platform was used in simulations dealing with virtual nuclear facilities. Simulation results indicated that the walking-path planning method is effective in providing safety for people walking in nuclear facilities.

  8. 2: Local area networks as a multiprocessor treatment planning system

    International Nuclear Information System (INIS)

    Neblett, D.L.; Hogan, S.E.

    1987-01-01

    The creation of a local area network (LAN) of interconnected computers provides an environment of multi computer processors that adds a new dimension to treatment planning. A LAN system provides the opportunity to have two or more computers working on the plan in parallel. With high speed interprocessor transfer, events such as the time consuming task of correcting several individual beams for contours and inhomogeneities can be performed simultaneously; thus, effectively creating a parallel multiprocessor treatment planning system

  9. Estimation of conservation value of myrtle (Myrtus communis using a contingent valuation method: a case study in a Dooreh forest area, Lorestan Province, Iran

    Directory of Open Access Journals (Sweden)

    Neda Amiri

    2015-11-01

    Full Text Available Background: Around 2000 plant species occur naturally in Lorestan Province of which 250 species are medicinal and myrtle is one of them. Myrtle is a shrub whose leaves and fruits have medicinal value and thus, if managed and harvested properly, could produce sustained economic benefits. In recent years, however, over half of the myrtle site areas was destroyed, due to inappropriate management and excessive harvesting practices. Thus, coming up with a practical harvesting approach along with identifying those factors damaging the sites, seems to be very crucial. Methods: In our investigation, we calculated the conservation value per hectare of myrtle in the Dooreh forest area in Lorestan Province. Using the Contingent Valuation (CV and Double Bounded Dichotomous Choice (DBDC methods, we determined the willingness to pay (WTP for myrtle conservation. The WTP was estimated with a logit model for which indices were obtained based on a maximum precision criterion. Results: The results showed that 86.67 per cent of people were willing to pay for the conservation of these myrtle sites. Average monthly WTP per family was calculated as $0.79. The annual conservation value in terms of WTP for the preservation of the myrtle sites in Dooreh was estimated as $102,525. Among the variables of the model presented, education had a positive impact, while the amount proposed for payment and family size had a negative impact on the WTP. Conclusions: Our estimate of the value of myrtle conservation should provide justification for policy makers and decision making bodies of natural resources to implement policies in order to conserve the natural sites of this species more effectively. Keywords: Conservation value, Myrtle, Contingent valuation method, Double Bounded Dichotomous method, Logit model

  10. Monetizing the social benefits of landfill mining: Evidence from a Contingent Valuation survey in a rural area in Greece.

    Science.gov (United States)

    Damigos, Dimitris; Menegaki, Maria; Kaliampakos, Dimitris

    2016-05-01

    Despite the emerging global attention towards promoting waste management policies that reduce environmental impacts and conserve natural resources, landfilling still remains the dominant waste management practice in many parts of the world. Owing to this situation, environmental burdens are bequeathed to and large amounts of potentially valuable materials are lost for future generations. As a means to undo these adverse effects a process known as landfill mining (LFM) could be implemented provided that economic feasibility is ensured. So far, only a few studies have focused on the economic feasibility of LFM from a private point of view and even less studies have attempted to economically justify the need for LMF projects from a social point of view. This paper, aiming to add to the limited literature in the field, presents the results of a survey conducted in a rural district in Greece, by means of the Contingent Valuation method (CVM) in order to estimate society's willingness to pay for LFM programs. According to the empirical survey, more than 95% of the respondents recognize the need for LFM programs. Nevertheless, only one-fourth of the respondents are willing to pay through increased taxes for LFM, owing mainly to economic depression and unemployment. Those who accept the increased tax are willing to pay about €50 per household per year, on average, which results in a mean willingness to pay (WTP) for the entire population under investigation of around €12 per household per year. The findings of this research work provide useful insights about the 'dollar-based' benefits of LFM in the context of social cost-benefit analysis of LFM projects. Yet, it is evident that further research is necessary. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. 300 Area waste acid treatment system closure plan. Revision 1

    International Nuclear Information System (INIS)

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan

  12. 300 Area waste acid treatment system closure plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.

  13. Mississippi National River and Recreation Area Water Trail Plan.

    Science.gov (United States)

    2017-05-05

    The Water Trail Plan describes the current conditions of and future plans for the Mississippi National River and Recreation Area (NRRA), a 72-mile stretch of the Mississippi River running through the Twin Cities region of Minnesota. In 2012, the NRRA...

  14. Puget Sound area electric reliability plan

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    Various conservation, load management, and fuel switching programs were considered as ways to reduce or shift system peak load. These programs operate at the end-use level, such as residential water heat. Figure D-1a shows what electricity consumption for water heat looks like on normal and extreme peak days. Load management programs, such as water heat control, are designed to reduce electricity consumption at the time of system peak. On the coldest day in average winter, system load peaks near 8:00 a.m. In a winter with extremely cold weather, electricity consumption increases fr all hours, and the system peak shifts to later in the morning. System load shapes in the Puget Sound area are shown in Figure D-1b for a normal winter peak day (February 2, 1988) and extreme peak day (February 3, 1989). Peak savings from any program are calculated to be the reduction in loads on the entire system at the hour of system peak. Peak savings for all programs are measured at 8:00 a.m. on a normal peak day and 9:00 a.m. on an extreme peak day. On extremely cold day, some water heat load shifts to much later in the morning, with less load available for shedding at the time of system peak. Models of hourly end-use consumption were constructed to simulate the impact of conservation, land management, and fuel switching programs on electricity consumption. Javelin, a time-series simulating package for personal computers, was chosen for the hourly analysis. Both a base case and a program case were simulated. 15 figs., 7 tabs.

  15. Williamsport Area Community College Long Range Planning: The Long Range Plan, Update 1987.

    Science.gov (United States)

    Williamsport Area Community Coll., PA.

    This update to Williamsport Area Community College's (WACC's) 1984-89 long-range plan offers a status report on each of the plan's 78 objectives, reassigns responsibility for specific objectives to make the plan responsive to the current organizational structure of the college, and offers 11 new objectives for the 1986-87 academic year. After…

  16. Proposed plan for remedial action at the chemical plant area of the Weldon Spring site

    International Nuclear Information System (INIS)

    1992-11-01

    This proposed plan addresses the management of contaminated material at the chemical plant area of the Weldon Spring site and nearby properties in St. Charles County, Missouri. The site consists of a chemical plant area and a noncontiguous limestone quarry, both of which are radioactively and chemically contaminated as a result of past processing and disposal activities. Explosives were produced at the chemical plant in the 1940s, and uranium and thorium materials were processed in the 1950s and 1960s. Various liquid, sludge, and solid wastes were disposed of at the Chemical plant area and in the quarry during that time. The Weldon Spring site is listed on the National Priorities List (NPL) of the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE) is conducting cleanup activities at the site under its Environmental Restoration and Waste Management Program. The proposed plan is organized as follows: Chapter 2 presents the history and setting of the Weldon Spring site and briefly describes the contaminated material at the chemical plant area. Chapter 3 defines the scope of the remedial action and its role in the Weldon Spring Site Remedial Action Project. Chapter 4 summarizes the risks associated with possible exposures to site contaminants in the absence of remedial action and identifies proposed cleanup levels for soil. Chapter 5 briefly describes the final alternatives considered for the remedial action. Chapter 6 summarizes the evaluation of final alternatives for managing the contaminated material, identifies the currently preferred alternative, and discusses a possible contingency remedy to provide treatment flexibility. Chapter 7 presents the community's role in this action. Chapter 8 is a list of the references cited in this proposed plan

  17. Contingency Teaching during Close Reading

    Science.gov (United States)

    Fisher, Douglas; Frey, Nancy

    2015-01-01

    12 teachers were interviewed and observed as they engaged students in close reading. We analyzed their responses and instruction to determine the scaffolds that were used as well as the contingency teaching plans they implemented when students were unable to understand the text.

  18. China National Scenic Area and Its Planning Characteristics

    Institute of Scientific and Technical Information of China (English)

    Jia; Jianzhong; Deng; Wugong; Li; Caige

    2016-01-01

    Thirty years since the foundation of China’s scenic area system, a comparatively comprehensive structural system, legal system, and management system have been established in this field, which has protected precious landscape resources and made remarkable achievements. The planning of scenic areas has its own attributes and technical characteristics, which attaches great importance to establishing a functional structure that combines the three systems of sightseeing, tourism services, and social management of local residents. Moreover, with the development of scenic areas, the planning will lay more emphasis on the connection between different levels, give full play to the comprehensive function of scenic areas, pay attention to the research on village and town planning within the area, and learn from the experience of national parks in foreign countries.

  19. China National Scenic Area and Its Planning Characteristics

    Institute of Scientific and Technical Information of China (English)

    Jia Jianzhong; Deng Wugong; Li Caige

    2016-01-01

    Thirty years since the foundation of China's scenic area system,a comparatively comprehensive structural system,legal system,and management system have been established in this field,which has protected precious landscape resources and made remarkable achievements.The planning of scenic areas has its own attributes and technical characteristics,which attaches great importance to establishing a functional structure that combines the three systems of sightseeing,tourism services,and social management of local residents.Moreover,with the development of scenic areas,the planning will lay more emphasis on the connection between different levels,give full play to the comprehensive function of scenic areas,pay attention to the research on village and town planning within the area,and learn from the experience of national parks in foreign countries.

  20. Dynamic Contingency Analysis Tool

    Energy Technology Data Exchange (ETDEWEB)

    2016-01-14

    The Dynamic Contingency Analysis Tool (DCAT) is an open-platform and publicly available methodology to help develop applications that aim to improve the capabilities of power system planning engineers to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. Outputs from the DCAT will help find mitigation solutions to reduce the risk of cascading outages in technically sound and effective ways. The current prototype DCAT implementation has been developed as a Python code that accesses the simulation functions of the Siemens PSS/E planning tool (PSS/E). It has the following features: It uses a hybrid dynamic and steady-state approach to simulating the cascading outage sequences that includes fast dynamic and slower steady-state events. It integrates dynamic models with protection scheme models for generation, transmission, and load. It models special protection systems (SPSs)/remedial action schemes (RASs) and automatic and manual corrective actions. Overall, the DCAT attempts to bridge multiple gaps in cascading-outage analysis in a single, unique prototype tool capable of automatically simulating and analyzing cascading sequences in real systems using multiprocessor computers.While the DCAT has been implemented using PSS/E in Phase I of the study, other commercial software packages with similar capabilities can be used within the DCAT framework.

  1. Study on Planning Standards for Urban Renewal Areas in Shenzhen

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    The paper starts from the origin and evolution of city planning standards of Shenzhen before analyzing the new demands for the standards by the development of city renewal amid city transition,and establishes a primary framework for the planning standards and requirements.In addition,on the basis of comparing with the formulation of planning standards of Hong Kong,Shanghai,and Changsha,the paper carries out a discussion on the formulation ideas and main contents of the planning standards for the urban renewal areas in Shenzhen.Moreover,the paper also analyzes the standards for renewal objects,scope,mode,functions guidance,development control,and public facilities,all of which are quite heated issues and key elements in the process of formulation and approval of renewal planning,in order to improve the institutional structure of the City Planning Standards and Requirements of Shenzhen and meet the government’s demand in realizing a refined management.

  2. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site

  3. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy's Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  4. Comprehensive work plan and health and safety plan for the 7500 Area Contamination Site sampling at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Burman, S.N.; Landguth, D.C.; Uziel, M.S.; Hatmaker, T.L.; Tiner, P.F.

    1992-05-01

    As part of the Environmental Restoration Program sponsored by the US Department of Energy`s Office of Environmental Restoration and Waste Management, this plan has been developed for the environmental sampling efforts at the 7500 Area Contamination Site, Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee. This plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division of ORNL and will be implemented by ORNL/MAD. Major components of the plan include (1) a quality assurance project plan that describes the scope and objectives of ORNL/MAD activities at the 7500 Area Contamination Site, assigns responsibilities, and provides emergency information for contingencies that may arise during field operations; (2) sampling and analysis sections; (3) a site-specific health and safety section that describes general site hazards, hazards associated with specific tasks, personnel protection requirements, and mandatory safety procedures; (4) procedures and requirements for equipment decontamination and responsibilities for generated wastes, waste management, and contamination control; and (5) a discussion of form completion and reporting required to document activities at the 7500 Area Contamination Site.

  5. 77 FR 12644 - Submission of U.S. Carrier and Airport Tarmac Delay Contingency Plans to Department of...

    Science.gov (United States)

    2012-03-01

    ... (Enforcement Office) will be establishing an electronic submission system to enable covered airlines and... also contain a description of how the carrier will: (1) Provide adequate food, potable water, restroom... complaint reporting system, where covered airlines and airports will submit their required plans. The...

  6. 77 FR 27267 - Submission of U.S. Carrier and Airport Tarmac Delay Contingency Plans to Department of...

    Science.gov (United States)

    2012-05-09

    ... also contain a description of how the carrier will: (1) Provide adequate food, potable water, restroom... , similar to the Department's current disability complaint reporting system, to enable covered U.S. airlines... to use the tarmac delay plan filing system, covered U.S. airlines and airports will need to register...

  7. Economic valuation of the ecosystem services provided by a protected area in the Brazilian Cerrado: application of the contingent valuation method.

    Science.gov (United States)

    Resende, F M; Fernandes, G W; Andrade, D C; Néder, H D

    2017-11-01

    Considering that the economic valuation of ecosystem services is a useful approach to support the conservation of natural areas, we aimed to estimate the monetary value of the benefits provided by a protected area in southeast Brazil, the Serra do Cipó National Park. We calculated the visitor's willingness to pay to conserve the ecosystems of the protected area using the contingent valuation method. Located in a region under intense anthropogenic pressure, the Serra do Cipó National Park is mostly composed of rupestrian grassland ecosystems, in addition to other Cerrado physiognomies. We conducted a survey consisting of 514 interviews with visitors of the region and found that the mean willingness to pay was R$ 7.16 year-1, which corresponds to a total of approximately R$ 716,000.00 year-1. We detected that per capita income, the household size, the level of interest in environmental issues and the place of origin influenced the likelihood that individuals are willing to contribute to the conservation of the park, as well as the value of the stated willingness to pay. This study conveys the importance of conserving rupestrian grassland and other Cerrado physiognomies to decision makers and society.

  8. The South Carolina National Guard Secure Area Duty Officer Program: A Reserve Component Active Shooter Contingency Case Study

    Science.gov (United States)

    2017-12-01

    statistics —military bases had become, “in essence, Gun-Free Zones (GFZ).”35 In fact, military regulations do authorize firearms for personal...conspicuous statistics , it was clear to the TWG that the status quo of the DHS plan was not a viable option to meet the intent of the SC TAG, nor ethically...permit. SADOP instructors issue the SADOP PSIC exam that covers topics taught in the introductory , fundamentals, and SADOP doctrine and policy lessons

  9. ATIPS: Automatic Travel Itinerary Planning System for Domestic Areas.

    Science.gov (United States)

    Chang, Hsien-Tsung; Chang, Yi-Ming; Tsai, Meng-Tze

    2016-01-01

    Leisure travel has become a topic of great interest to Taiwanese residents in recent years. Most residents expect to be able to relax on a vacation during the holidays; however, the complicated procedure of travel itinerary planning is often discouraging and leads them to abandon the idea of traveling. In this paper, we design an automatic travel itinerary planning system for the domestic area (ATIPS) using an algorithm to automatically plan a domestic travel itinerary based on user intentions that allows users to minimize the process of trip planning. Simply by entering the travel time, the departure point, and the destination location, the system can automatically generate a travel itinerary. According to the results of the experiments, 70% of users were satisfied with the result of our system, and 82% of users were satisfied with the automatic user preference learning mechanism of ATIPS. Our algorithm also provides a framework for substituting modules or weights and offers a new method for travel planning.

  10. 300 Area waste acid treatment system closure plan

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999

  11. 300 Area waste acid treatment system closure plan

    Energy Technology Data Exchange (ETDEWEB)

    LUKE, S.N.

    1999-05-17

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.

  12. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  13. Real-time laboratory exercises to test contingency plans for classical swine fever: experiences from two national laboratories

    DEFF Research Database (Denmark)

    Koenen, K.; Uttenthal, Åse; Meindl-Böhmer, A.

    2007-01-01

    In order to adequately and efficiently handle outbreaks of contagious diseases such as classical swine fever (CSF), foot and mouth disease or highly pathogenic avian influenza, competent authorities and the laboratories involved have to be well prepared and must be in possession of functioning....... It is essential that these plans are established during ‘peace-time’ and are reviewed regularly. This paper provides suggestions on how to perform laboratory exercises to test preparedness and describes the experiences of two national reference laboratories for CSF. The major lesson learnt was the importance...

  14. Evaluation and analysis of emergency maintenance due by third party action's, formulation and execution of contingency plans

    Energy Technology Data Exchange (ETDEWEB)

    Torres Vega, Raul; Nunez Ribera, Gary [TRANSIERRA S.A., Santa Cruz (Bolivia)

    2009-07-01

    In September 2008, in the Yacuiba - Rio Grande Gas Pipeline (GASYRG) located in the south of Bolivia, atypical situations took place. Due to the political events and the social mobilizations in which the country was, a series of third party actions developed putting in risk the facilities of the gas pipeline. These actions resulted in the rupture of a 1 inch instrumentation pipe, causing a leak witch some time caught fire and caused an interruption of the transportation service in that section of the pipeline, later on, another action derived in safety valve shut down causing a total pipeline shut down. In addition to these events we experience a fuel shortage, road blocks and a telephone communication system failure. In spite of these obstacles the maintenance activities were realized and emergency repairs put back in operating conditions the gas pipeline, task that was accomplished in a very short time, taking in account the situation. Later analysis, including all the adverse elements of the situation, result in the adoption of a series of measures and plans directed to mitigate the risk associated to this type of events, such as Mutual Aid Plans with fellow companies and institutions, fortification of the patrimonial security, stock material handling for emergency repairs, etc. (author)

  15. Age and area predict patterns of species richness in pumice rafts contingent on oceanic climatic zone encountered.

    Science.gov (United States)

    Velasquez, Eleanor; Bryan, Scott E; Ekins, Merrick; Cook, Alex G; Hurrey, Lucy; Firn, Jennifer

    2018-05-01

    The theory of island biogeography predicts that area and age explain species richness patterns (or alpha diversity) in insular habitats. Using a unique natural phenomenon, pumice rafting, we measured the influence of area, age, and oceanic climate on patterns of species richness. Pumice rafts are formed simultaneously when submarine volcanoes erupt, the pumice clasts breakup irregularly, forming irregularly shaped pumice stones which while floating through the ocean are colonized by marine biota. We analyze two eruption events and more than 5,000 pumice clasts collected from 29 sites and three climatic zones. Overall, the older and larger pumice clasts held more species. Pumice clasts arriving in tropical and subtropical climates showed this same trend, where in temperate locations species richness (alpha diversity) increased with area but decreased with age. Beta diversity analysis of the communities forming on pumice clasts that arrived in different climatic zones showed that tropical and subtropical clasts transported similar communities, while species composition on temperate clasts differed significantly from both tropical and subtropical arrivals. Using these thousands of insular habitats, we find strong evidence that area and age but also climatic conditions predict the fundamental dynamics of species richness colonizing pumice clasts.

  16. 25 CFR 39.501 - What is an emergency or unforeseen contingency?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is an emergency or unforeseen contingency? 39.501... EQUALIZATION PROGRAM Contingency Fund § 39.501 What is an emergency or unforeseen contingency? An emergency or unforeseen contingency is an event that meets all of the following criteria: (a) It could not be planned for...

  17. Carlsbad Area Office strategic plan, March 1995. Revision 1

    International Nuclear Information System (INIS)

    1995-03-01

    This edition of the Carlsbad Area Office Strategic Plan captures the US Department of Energy's (DOE's) new focus, and supersedes the edition issued previously (DOE, 1993a). This revision reflects: a revised strategy designed to demonstrate compliance with environmental regulations earlier than the previous course of action; and a focus on establishment of standardized transuranic waste characterization and acceptance criteria for disposal facilities

  18. 1325-N Liquid Waste Disposal Facility Supplemental Information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-03-01

    The 1325-N Liquid Waste Disposal Facility located at the 100-N Area of the Hanford Site started receiving part of the N Reactor liquid radioactive effluent flow in 1983. In September 1985, the 1325-N Facility became the primary liquid waste disposal system for the N Reactor. The facility is located approximately 60 feet above and 2000 feet east of the shore of the Columbia River. Waste stream discharges were ceased in April 1991.Specific information on types of waste discharged to 1325-N are contained within the Part A, Form 3, Permit application of this unit

  19. 40 CFR 51.1012 - Requirement for contingency measures.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Requirement for contingency measures... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1012 Requirement for contingency measures... contingency measures to be undertaken if the area fails to make reasonable further progress, or fails to...

  20. Experimental area plans for an advanced hadron facility

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, E.W.; Macek, R.J.; Tschalear, C.

    1986-01-01

    A brief overview is presented of the current plans for an experimental area for a new advanced hadron facility for the exploration of nuclear and particle physics. The facility, LAMPF II, is presently visualized as consisting of the LAMPF linac sending 800 MeV protons to a 6 GeV booster ring followed by a 45 GeV main ring. Two experimental areas area planned. The first is intended to provide neutrinos via a pair of pulsed focusing horns. The other is designed to accommodate secondary beams that span the range of useful energies up to GeV/c. Beam specification goals are discussed with respect to source brightness, beam purity, and beam-line acceptance and length. The various beam lines are briefly described. Production cross sections and rates are estimated for antiproton production. Problems of thermal energy deposition in both components and targets and of effectiveness of particle separators are discussed. 9 refs. (LEW)

  1. Experimental area plans for an advanced hadron facility

    International Nuclear Information System (INIS)

    Hoffman, E.W.; Macek, R.J.; Tschalear, C.

    1986-01-01

    A brief overview is presented of the current plans for an experimental area for a new advanced hadron facility for the exploration of nuclear and particle physics. The facility, LAMPF II, is presently visualized as consisting of the LAMPF linac sending 800 MeV protons to a 6 GeV booster ring followed by a 45 GeV main ring. Two experimental areas area planned. The first is intended to provide neutrinos via a pair of pulsed focusing horns. The other is designed to accommodate secondary beams that span the range of useful energies up to GeV/c. Beam specification goals are discussed with respect to source brightness, beam purity, and beam-line acceptance and length. The various beam lines are briefly described. Production cross sections and rates are estimated for antiproton production. Problems of thermal energy deposition in both components and targets and of effectiveness of particle separators are discussed. 9 refs

  2. Exercise ASKARI SERPENT: enabling clinical data collection during exercises and operations to support future contingency planning and assurance of category-based reporting systems.

    Science.gov (United States)

    Parsons, Iain T; Wheatley, R J; Carter, P

    2016-02-01

    Exercise ASKARI SERPENT (Ex AS) is a British Army exercise that provides primary healthcare (PHC) to Kenyan civilians in support of local health authorities. It is conducted in partnership with the Kenya Defence Force Medical Services (KDFMS). Accurate epidemiological data is critical in planning the exercise and for any future short-notice contingency operations in similar environments. This paper reports epidemiological data for Ex AS using a novel data collection system. PHC on Ex AS was delivered by trained and validated combat medical technicians (CMTs) using a set of Read-coded protocols. The CMTs were also directly supported and supervised by medical officers and nurses. A total of 3093 consultations were conducted over a 16-day period. Of these, 2707 (87.5%) consultations fell within the remit of the CMT protocols, with only 386 consultations (12.5%) being conducted exclusively by the medical officers or nurses. A Read-coded matrix built on CMT protocols is a simple and useful tool, particularly in civilian populations, for collecting morbidity data with the vast majority of conditions accounted for in the protocols. It is anticipated that such a system can better inform training, manning, medical material and pharmaceutical procurement than current category-based morbidity surveillance systems such as EPINATO (NATO epidemiological data). There is clear advantage to directly linking data capture to treatment algorithms. Accuracy, both in terms of numbers and condition, is likely improved. Data is also captured contemporaneously rather than after indeterminate time. Read coding has the added benefit of being an established electronic standard. In addition, the system would support traditional reporting methods such as EPINATO by providing increased assurance. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  3. The economic value of transportation energy contingency planning: An objective model for analyzing the economics of domestic renewable energy for supply augmentation

    Science.gov (United States)

    Shaten, Richard Jay

    1998-12-01

    Petroleum provides 90% of transportation energy needs. Domestic production is decreasing and global demand is increasing. Risk of escalating prices and supply interruptions are compounded by environmental and military externalities and lost opportunities from the failure to develop alternative domestic resources. Within the context of "energy contingency planning" municipalities should evaluate crisis mitigation strategies. Supply augmentation using domestic renewable fuels is proposed to avert future financial liabilities. A method for calculating the economic value of this strategy is demonstrated. An objective function and associated constraints represent the cost of preparing for each of three possible scenarios: status quo, inflationary and crisis. Constraints ensure that municipal fuel needs are met. Environmental costs may be included. Optimal solutions determine the fuel supply mix for each scenario. A 3 x 3 matrix presents the range of actual costs resulting from preparing for each scenario and subsequent three possible outcomes. The distribution of probabilities of the outcomes is applied to the cost matrix and an "expected value" of preparing for each scenario is calculated. An unanticipated crisis outcome results in. The expected value of the cost of preparing for a crisis is cast as an insurance premium against potential economic liability. Policy makers accept the crisis preparation fuel mix if: (a) they agree with the calculated penalty cost, or (b) they accept the burden of the insurance premium. Green Bay Wisconsin was chosen as a sample municipality. Results show that a perceived 10% chance of crisis requires an annual tax of 4.00 per household to avert economic impacts of 50 million. At a perceived 50% chance of crisis preparing for the crisis would begin to save the municipality money.

  4. Plutonium Focus Area research and development plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The Department of Energy (DOE) committed to a research and development program to support the technology needs for converting and stabilizing its nuclear materials for safe storage. The R and D Plan addresses five of the six material categories from the 94-1 Implementation Plan: plutonium (Pu) solutions, plutonium metals and oxides, plutonium residues, highly enriched uranium, and special isotopes. R and D efforts related to spent nuclear fuel (SNF) stabilization were specifically excluded from this plan. This updated plan has narrowed the focus to more effectively target specific problem areas by incorporating results form trade studies. Specifically, the trade studies involved salt; ash; sand, slag, and crucible (SS and C); combustibles; and scrub alloy. The plan anticipates possible disposition paths for nuclear materials and identifies resulting research requirements. These requirements may change as disposition paths become more certain. Thus, this plan represents a snapshot of the current progress and will continue to be updated on a regular basis. The paper discusses progress in safeguards and security, plutonium stabilization, special isotopes stabilization, highly-enriched uranium stabilization--MSRE remediation project, storage technologies, engineered systems, core technology, and proposed DOE/Russian technology exchange projects.

  5. Plutonium Focus Area research and development plan. Revision 1

    International Nuclear Information System (INIS)

    1996-11-01

    The Department of Energy (DOE) committed to a research and development program to support the technology needs for converting and stabilizing its nuclear materials for safe storage. The R and D Plan addresses five of the six material categories from the 94-1 Implementation Plan: plutonium (Pu) solutions, plutonium metals and oxides, plutonium residues, highly enriched uranium, and special isotopes. R and D efforts related to spent nuclear fuel (SNF) stabilization were specifically excluded from this plan. This updated plan has narrowed the focus to more effectively target specific problem areas by incorporating results form trade studies. Specifically, the trade studies involved salt; ash; sand, slag, and crucible (SS and C); combustibles; and scrub alloy. The plan anticipates possible disposition paths for nuclear materials and identifies resulting research requirements. These requirements may change as disposition paths become more certain. Thus, this plan represents a snapshot of the current progress and will continue to be updated on a regular basis. The paper discusses progress in safeguards and security, plutonium stabilization, special isotopes stabilization, highly-enriched uranium stabilization--MSRE remediation project, storage technologies, engineered systems, core technology, and proposed DOE/Russian technology exchange projects

  6. Innovation in Management Plans for Community Conserved Areas: Experiences from Australian Indigenous Protected Areas

    Directory of Open Access Journals (Sweden)

    Jocelyn Davies

    2013-06-01

    Full Text Available Increasing attention to formal recognition of indigenous and community conserved areas (ICCAs as part of national and/or global protected area systems is generating novel encounters between the customary institutions through which indigenous peoples and local communities manage these traditional estates and the bureaucratic institutions of protected area management planning. Although management plans are widely considered to be important to effective management of protected areas, little guidance has been available about how their form and content can effectively reflect the distinctive socio-cultural and political characteristics of ICCAs. This gap has been particularly apparent in Australia where a trend to rapidly increased formal engagement of indigenous people in environmental management resulted, by 2012, in 50 indigenous groups voluntarily declaring their intent to manage all or part of their estates for conservation in perpetuity, as an indigenous protected area (IPA. Development and adoption of a management plan is central to the process through which the Australian Government recognizes these voluntary declarations and invests resources in IPA management. We identified four types of innovations, apparent in some recent IPA plans, which reflect the distinctive socio-cultural and political characteristics of ICCAs and support indigenous people as the primary decision makers and drivers of knowledge integration in IPAs. These are (1 a focus on customary institutions in governance; (2 strategic planning approaches that respond to interlinkages of stewardship between people, place, plants, and animals; (3 planning frameworks that bridge scales by considering values and issues across the whole of an indigenous people's territory; and (4 varied communication modes appropriate to varied audiences, including an emphasis on visual and spatial modes. Further research is warranted into how governance and management of IPAs, and the plans that

  7. The planning of areas near nuclear power stations

    International Nuclear Information System (INIS)

    1977-01-01

    During the past five years national physical planning has been initiated by the Swedish Parliament. Guidelines have been given to the communities how to consider national interests when drawing up local planning and how to produce maps and descriptions of the planning. For the planning of the areas near the nuclear power stations the municipalities have certain guidelines from The Nuclear Power Inspectorate and The National Institute of Radiation Protection. It is advised to keep a low population density near the power plants, to avoid the type of harbour or industry which could have disturbing effects on the power plant and also to avoid to concentrate people, who are difficult to move from the area in case of an accident (i.e., homes for old people, maternity homes and prisons). The plants on the East Coast, Forsmark and Oskarshamn, are located in wooded areas with a very low population density. On the West Coast, near Ringhals and Barsebaeck, the population density is higher, and there is one village with about 2,000 inhabitants, situated at a distance of two (2) km from the Ringhals power plant. The Control Boards are now reluctant to concentrate more people in this village, where schools and shops were earlier planned for 3,000 inhabitants. The building activity near power plants is regulated by law. New buildings are prohibited within a distance of two (2) km from the plants. Some exeptions can be granted by the County Administrative Board after guidance from the Central Board. In a zone reaching 10 kilometers from the power plants there are no regulations by law about new buildings, except the earlier mentioned guidelines from the Central Boards to maintain a low population. (L.E.)

  8. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    International Nuclear Information System (INIS)

    Loll, C.M.

    1994-01-01

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures

  9. Chemical Spill Prevention, Control, and Countermeasures Plan: 100 Areas

    Energy Technology Data Exchange (ETDEWEB)

    Chien, Y.M.

    1989-06-01

    The purpose of this Chemical Spill Prevention, Control, and Countermeasures (SPCC) Plan is to identify the chemical spill control practices, procedures, and containment devices Westinghouse Hanford Company (Westinghouse Hanford) employs to prevent a reportable quantity (RQ) of a hazardous substance (as defined in 40 CFR Part 302) from being released to the environment. The chemical systems and chemical storage facilities in the 100 Areas are described. This document traces the ultimate fate of accidental chemical spills at the 100 Areas. Also included in the document destinations, spill containment devices, and systems surveillance frequencies. 2 tabs.

  10. Chemical Spill Prevention, Control, and Countermeasures Plan: 100 Areas

    International Nuclear Information System (INIS)

    Chien, Y.M.

    1989-06-01

    The purpose of this Chemical Spill Prevention, Control, and Countermeasures (SPCC) Plan is to identify the chemical spill control practices, procedures, and containment devices Westinghouse Hanford Company (Westinghouse Hanford) employs to prevent a reportable quantity (RQ) of a hazardous substance (as defined in 40 CFR Part 302) from being released to the environment. The chemical systems and chemical storage facilities in the 100 Areas are described. This document traces the ultimate fate of accidental chemical spills at the 100 Areas. Also included in the document destinations, spill containment devices, and systems surveillance frequencies. 2 tabs

  11. 200 Area Liquid Effluent Facilities -- Quality assurance program plan

    International Nuclear Information System (INIS)

    Fernandez, L.

    1995-01-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance and management controls used by the 200 Area Liquid Effluent Facilities (LEF) to perform its activities in accordance with DOE Order 5700.6C. The 200 Area LEF consists of the following facilities: Effluent Treatment Facility (ETF); Treated Effluent Disposal Facility (TEDF); Liquid Effluent Retention facility (LERF); and Truck Loading Facility -- (Project W291). The intent is to ensure that all activities such as collection of effluents, treatment, concentration of secondary wastes, verification, sampling and disposal of treated effluents and solids related with the LEF operations, conform to established requirements

  12. The 300 area waste acid treatment system closure plan

    International Nuclear Information System (INIS)

    Luke, S.N.

    1996-01-01

    The 300 Area Waste Acid Treatment System (WATS) is located within operable units 300-FF-2 (source) and 300-FF-5 (groundwater), as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) . Operable units 300-FF-2 and 300-FF-5 are scheduled to be remediated using the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Remedial Investigation/Feasibility Study (RI/FS) process. Thus, any remediation of the 300 Area WATS with respect to contaminants not produced by those facilities and soils and groundwater will be deferred to the CERCLA RI/FS process. Final closure activities will be completed in 3 phases and certified in accordance with the 300 Area WATS closure plan by the Washington State Department of Ecology (Ecology) and the U.S. Environmental Protection Agency (EPA). It is anticipated that the 300 Area WATS closure would take 2 years to complete

  13. ATIPS: Automatic Travel Itinerary Planning System for Domestic Areas

    Directory of Open Access Journals (Sweden)

    Hsien-Tsung Chang

    2016-01-01

    Full Text Available Leisure travel has become a topic of great interest to Taiwanese residents in recent years. Most residents expect to be able to relax on a vacation during the holidays; however, the complicated procedure of travel itinerary planning is often discouraging and leads them to abandon the idea of traveling. In this paper, we design an automatic travel itinerary planning system for the domestic area (ATIPS using an algorithm to automatically plan a domestic travel itinerary based on user intentions that allows users to minimize the process of trip planning. Simply by entering the travel time, the departure point, and the destination location, the system can automatically generate a travel itinerary. According to the results of the experiments, 70% of users were satisfied with the result of our system, and 82% of users were satisfied with the automatic user preference learning mechanism of ATIPS. Our algorithm also provides a framework for substituting modules or weights and offers a new method for travel planning.

  14. ATIPS: Automatic Travel Itinerary Planning System for Domestic Areas

    Science.gov (United States)

    2016-01-01

    Leisure travel has become a topic of great interest to Taiwanese residents in recent years. Most residents expect to be able to relax on a vacation during the holidays; however, the complicated procedure of travel itinerary planning is often discouraging and leads them to abandon the idea of traveling. In this paper, we design an automatic travel itinerary planning system for the domestic area (ATIPS) using an algorithm to automatically plan a domestic travel itinerary based on user intentions that allows users to minimize the process of trip planning. Simply by entering the travel time, the departure point, and the destination location, the system can automatically generate a travel itinerary. According to the results of the experiments, 70% of users were satisfied with the result of our system, and 82% of users were satisfied with the automatic user preference learning mechanism of ATIPS. Our algorithm also provides a framework for substituting modules or weights and offers a new method for travel planning. PMID:26839529

  15. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  16. Family planning management for the migrant population in sending areas. Urban family planning programme.

    Science.gov (United States)

    1997-02-01

    This brief article was adapted from a report by the Longchang County Government, Sichuan Province, China, at the National Conference on Urban Family Planning Programs. The Longchang County family planning program has shifted emphasis since 1990 toward management of out-migrant workers. Overpopulation in the family planning region resulted in each person having about one-sixth of an acre (0.6 mu) of land. There were about 200,000 surplus rural workers. 75,000 migrants left the region in 1995, of which 70,300 had signed birth control contracts and had received family planning certificates. Family planning township agencies in Longchang County increased their IEC and counseling services for migrants and their families. The Longchang County family planning program maintained family planning contacts in receiving areas in order to obtain pregnancy and birth information on the migrant population. During 1991-95 the number of unplanned births declined from 1394 to 71, and 97% of the births were planned.

  17. 18 CFR 141.51 - FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report.

    Science.gov (United States)

    2010-04-01

    ..., Annual Electric Balancing Authority Area and Planning Area Report. 141.51 Section 141.51 Conservation of...) § 141.51 FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report. (a) Who... Policies Act, 16 U.S.C. 2602, operating a balancing authority area, and any group of electric utilities...

  18. Strategic Planning for the Development of the Danube Area

    Directory of Open Access Journals (Sweden)

    ANTONIO VALENTIN TACHE

    2014-12-01

    Full Text Available The article includes concepts, information, methodologies of spatial planning focused on the Danube carried out within the European projects "Donauregionen" and "Donauregionen+", financed by the European Union through the South East Europe Transnational Cooperation Programme. The article proposes solutions for solving problems related to the opportunities offered by the Danube as an important corridor to support the economic growth and competitiveness of functional regions in the Danube area. The current situation in the Danube River riparian land-use planning policies involves (a creating the spatial concept of the Danube area interregional level, b developing integrated strategies to develop sectoral strategies embodied in the Danube area, the Transdanube strategy and development strategies for the Danube region as a whole. In this general scheme, indicators have been proposed, designed on four main areas (natural conditions, housing and human resources, technical infrastructure and transport, and economy. Based on the analyses conducted in the project, five Danube sub-regions and 19 Transdanube regions were established. Using the forecasting methodology proposed in the “Donauregionen+” project, three types of scenarios were developed for each sub-region: pessimistic, realistic and optimistic. All these scenarios have resulted in GIS cartograms, based on groups of territorial indicators that highlight the socio-economic development capacity of the Danube sub-regions.

  19. Climate change and protected area policy and planning in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Scott, D. [Canada Research Chairs, Ottawa, ON (Canada); Waterloo Univ., ON (Canada). Dept. of Geography; Lemieux, C. [Waterloo Univ., ON (Canada). Dept. of Geography

    2005-10-01

    Challenges concerning climate change for agencies involved the management of Canada's protected areas were reviewed. Most protected areas have been designed to represent specific natural features, species and ecological communities, and are the most common and most important strategy for biodiversity conservation. It remains undecided whether adaptation should be a matter of responding to climate change as it manifests, or whether initiatives should be taken in advance to anticipate the potential effects of climate change. There are growing concerns that emergency adaptation will be less effective and more costly than anticipatory or precautionary adaptation over the long-term. Species extinction could result. It was noted that the northward shift of species from the United States will meet Parks Canada's existing definition of alien species in need of management interventions. The conservation objectives of individual protected areas would also be affected by projected biome and species changes, particularly as each of Canada's national parks is responsible for protecting ecosystems representative of the natural region within which it is located. All 6 vegetation change scenarios examined in a recent study projected the eventual loss of boreal forest in the Prince Albert National Park, suggesting that the park's current mandate to protect the ecological integrity of the area would no longer be viable. An overview of the policy and planning implications of climate change for protected areas in Canada was presented using examples from national and provincial park systems. A portfolio of climate change adaptation options in conservation literature was reviewed. Recommended strategies included system planning and policy development; active, adaptive ecosystem management; research and monitoring; and capacity building and awareness. It was concluded that governments will need to make major new investments in protected area establishment, personnel

  20. Savannah River Site plan for performing maintenance in Federal Facility Agreement areas (O and M Plan)

    International Nuclear Information System (INIS)

    Morris, D.R.

    1996-01-01

    The Savannah River Site was placed on the National Priority List (NPL) in December 1989 and became subject to comprehensive remediation in accordance with CERCLA. The FFA, effective August 16, 1993, establishes the requirements for Site investigation and remediation of releases and potential releases of hazardous substances, and interim status corrective action for releases of hazardous wastes or hazardous constituents. It was determined that further direction was needed for the Operating Departments regarding operation and maintenance activities within those areas listed in the FFA. The Plan for Performing Maintenance (O and M Plan) provides this additional direction. Section 4.0 addresses the operation and maintenance activities necessary for continued operation of the facilities in areas identified as RCRA/CERCLA Units or Site Evaluation Areas. Certain types of the O and M activity could be construed as a remedial or removal action. The intent of this Plan is to provide direction for conducting operation and maintenance activities that are not intended to be remedial or removal actions. The Plan identifies the locations of the units and areas, defines intrusive O and M activities, classifies the intrusive activity as either minor or major, and identifies the requirements, approvals, and documentation necessary to perform the activity in a manner that is protective of human health and the environment; and minimizes any potential impact to any future removal and remedial actions

  1. Groundwater monitoring plan for the 300 Area process trenches

    Energy Technology Data Exchange (ETDEWEB)

    Lindberg, J.W.; Chou, C.J.; Johnson, V.G.

    1995-05-23

    This document describes the groundwater monitoring program for the Hanford Site 300 Area Process Trenches (300 APT). The 300 APT are a Resource Conservation and Recovery Act of 1976 (RCRA) regulated unit. The 300 APT are included in the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit No. WA890008967, and are subject to final-status requirements for groundwater monitoring. This document describes a compliance monitoring program for groundwater in the uppermost aquifer system at the 300 APT. This plan describes the 300 APT monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the 300 APT. This plan will be used to meet groundwater monitoring requirements from the time the 300 APT becomes part of the Permit and through the postclosure care period until certification of final closure.

  2. Defense Infrastructure: Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations

    Science.gov (United States)

    2016-09-01

    supporting documentation for reviews that the U.S. Forces-Afghanistan conducted beginning in November 2011 of planned or ongoing contingency ...12 Contingency basing includes the planning , designing, constructing, operating, managing, and transitioning or closing of a non-enduring location...2016). Background Definition of “ Contingency Construction” Project Page 7 GAO-16-406 Defense Infrastructure statutory authority

  3. Tanks focus area multiyear program plan - FY96-FY98

    International Nuclear Information System (INIS)

    1995-07-01

    The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary

  4. Abbreviated sampling and analysis plan for planning decontamination and decommissioning at Test Reactor Area (TRA) facilities

    International Nuclear Information System (INIS)

    1994-10-01

    The objective is to sample and analyze for the presence of gamma emitting isotopes and hazardous constituents within certain areas of the Test Reactor Area (TRA), prior to D and D activities. The TRA is composed of three major reactor facilities and three smaller reactors built in support of programs studying the performance of reactor materials and components under high neutron flux conditions. The Materials Testing Reactor (MTR) and Engineering Test Reactor (ETR) facilities are currently pending D/D. Work consists of pre-D and D sampling of designated TRA (primarily ETR) process areas. This report addresses only a limited subset of the samples which will eventually be required to characterize MTR and ETR and plan their D and D. Sampling which is addressed in this document is intended to support planned D and D work which is funded at the present time. Biased samples, based on process knowledge and plant configuration, are to be performed. The multiple process areas which may be potentially sampled will be initially characterized by obtaining data for upstream source areas which, based on facility configuration, would affect downstream and as yet unsampled, process areas. Sampling and analysis will be conducted to determine the level of gamma emitting isotopes and hazardous constituents present in designated areas within buildings TRA-612, 642, 643, 644, 645, 647, 648, 663; and in the soils surrounding Facility TRA-611. These data will be used to plan the D and D and help determine disposition of material by D and D personnel. Both MTR and ETR facilities will eventually be decommissioned by total dismantlement so that the area can be restored to its original condition

  5. 77 FR 52754 - Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning Area

    Science.gov (United States)

    2012-08-30

    ...-FF03E00000] Draft Midwest Wind Energy Multi-Species Habitat Conservation Plan Within Eight-State Planning... our planning partners, intend to prepare the Midwest Wind Energy Multi-Species Habitat Conservation... decommissioning of wind energy facilities within all or portions of the eight-State planning area. Activities...

  6. 300 Area Process Trenches Modified Closure/Postclosure Plan

    International Nuclear Information System (INIS)

    1997-09-01

    This chapter provides a brief summary of the contents of each chapter of this plan for the closure of the 300 Area Process Trenches (300 APT) treatment, storage, and/or disposal unit. It also provides background information for this unit and discusses how its closure will be integrated with the remedial action for the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 300- FF-1 Operable Unit. The 300 APT is located within the 300 Area of the Hanford Site. This area contained reactor fuel fabrication facilities and research and development laboratories. The 300 APT was constructed and began operations in 1975 as the 316-5 Process Trenches. Effluent was discharged to the trenches by way of the 300 Area process sewer system, which has been the sole source of effluent for the 300 APT. The 316-5 Process Trenches gained Resource Conservation and Recovery Act of 1976 (RCRA) interim status as the 300 APT TSD unit on November 11, 1985. The unit has been administratively closed to discharges of dangerous waste since 1985

  7. Mountainous areas and decentralized energy planning: Insights from Greece

    International Nuclear Information System (INIS)

    Katsoulakos, Nikolas M.; Kaliampakos, Dimitris C.

    2016-01-01

    Mountainous areas have particular characteristics, whose influence on energy planning is explored in this paper, through a suitably tailored methodology applied to the case of Greece. The core element of the methodology is a linear optimization model with a “total cost” objective function, which includes financial, as well as external costs and benefits. Altitude proves to have decisive influence on energy optimization results, because it affects energy demand. The improvement of local energy systems provides greater socioeconomic benefits in mountainous settlements, due to the high shares of renewables and energy efficiency interventions in the optimal solutions. Energy poverty can be alleviated by redesigning local energy systems and the structure of the energy market. However, spatial and aesthetic restrictions, presented often in mountainous settlements, may affect the operational costs of energy systems, which is a crucial parameter for confronting energy poverty. Furthermore, the study indicates that it could be better to electrify remote areas, far from electricity grids, by decentralized systems than by grid expansion. The results of this study and the assumptions made about the way in which energy market should function, could be utilized for reconsidering energy policy measures, aiming at supporting sensitive societies to improve their development perspectives. - Highlights: •The influence of mountains' characteristics on energy planning was analyzed. •Optimal energy solutions present differentiations with respect to altitude. •Greater socioeconomic benefits by energy optimization in mountainous areas. •Remoteness favors the development of decentralized energy systems. •The study is based on data from Greece.

  8. Mobile contingency unit

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Sergio O. da; Magalhaes, Milton P. de [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Junqueira, Rodrigo A.; Torres, Carlos A.R. [PETROBRAS Transporte S/A (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    This paper is aimed at presenting what is already a reality in TRANSPETRO in the area covered by OSBRA, a pipeline that carries by-products to the Mid-West region of Brazil. In order to meet the needs of covering occasional accidents, TRANSPETRO counts on a standardized system of emergency management. It is a great challenge to secure an efficient communication along the 964 km of extension, considering that there are shadow zones where it is not possible to use conventional means of communication such as mobile telephony and internet. It was in this context that the Mobile Contingency Unit Via Satellite - MCU was developed, to extend the communication facilities existing in fixed installations to remote places, mainly the pipeline right of ways. In case of emergency, simulation and work in the pipeline right of way, MCU is fully able to provide the same data, voice, closed-circuit TV and satellite video conference facilities that are available in any internal area of the PETROBRAS system. (author)

  9. Collective proposal of Contingency Plan as an alternative for management risks to socioenvironmental disasters within Network Management Risk of Córrego Dantas (REGER-CD), Nova Friburgo, State of Rio de Janeiro, Brazil

    Science.gov (United States)

    Freitas, Leonardo; Luiza Coelho Netto, Ana

    2017-04-01

    An extreme rainfall event took place in the Mountainous Region of the state of Rio de Janeiro in January 2011, causing a catastrophic landslide that resulted in more than 900 deaths and 350 people disappearances. Precipitation events associated with landslides are common in this region and climate change tends to increase the frequency of intense rains and, consequently, landslides. At the same time, the vulnerability of communities has increased as a result of disorderly urban growth. Despite that, before 2011 communities and public power were not prepared to disaster management..After the 2011 event, public authorities try to established policies to reduce these vulnerabilities. One of the communities where the government acted was Córrego Dantas. However, the actions in this place were carried out in a top-down model, without discussion with population. As a consequence, the performance of public power has amplified social vulnerabilities. Highlight for the truculent removal of residents; resettlement in geographically isolated housing complexes; and the establishment of urbanization policies that go against the interests of the residents. The construction of the Córrego d'Aantas Disaster Risk Management Network (REGER-CD), including residents of affected communities, researchers, NGO members and representatives of the public power, is one way to respond these questions. Within this network, the construction of a proposal for a collective contingency plan, articulated with the municipal contingency plan, is generating residents' empowerment, greater adaptation to risks and reducing the vulnerability of Disasters and mass movements

  10. Fluid management plan for the Project Shoal Area Offsites Subproject

    International Nuclear Information System (INIS)

    1996-08-01

    The US Department of Energy, Nevada Operations Office (DOE/NV) has initiated the Offsites Subproject to characterize the hazards posed to human health and the environment as a result of underground nuclear testing activities at facilities other than the Nevada Test Site (NTS). A primary Subproject objective is to gather adequate data to characterize the various Subproject sites through the collection of surface and subsurface soil samples and by drilling several wells for the collection of groundwater data. The Project Shoal Area (PSA) is one of the Subproject's Nevada sites and is subject to the requirements set forth in the Federal Facility Compliance Agreement and Consent Order (FFACO) (DOE, 1996a). In accordance with the FFACO, a Corrective Action Investigation Plan (CAIP) has been developed for work at the PSA (designated as Corrective Action Unit Number 416). This Fluid Management Plan (FMP) provides guidance for the management of fluids generated from wells constructed at the PSA. Long-term monitoring and future activities at the site, if required, will be set forth in additional documents as required by the FFACO. The ultimate method for disposition of fluids generated by site operations depends upon sample analysis and process knowledge in relation to fluid management criteria. Section 2 describes well site operations; Section 3 discusses fluid management criteria; Section 4 includes the fluid monitoring program; Section 5 presents the fluid management strategy; Section 6 provides for fluid management during routine well monitoring; and Section 7 contains reporting criteria

  11. Puget Sound area electric reliability plan: Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin

  12. Characterization plan for Solid Waste Storage Area 6

    International Nuclear Information System (INIS)

    Boegly, W.J. Jr.; Dreier, R.B.; Huff, D.D.; Kelmers, A.D.; Kocher, D.C.; Lee, S.Y.; O'Donnell, F.R.; Pin, F.G.; Smith, E.D.

    1985-12-01

    Solid Waste Storage Area 6 (SWSA-6) is the only currently operating low-level radioactive waste (LLW) shallow land burial facility at the Oak Ridge National Laboratory. The US Department of Energy (DOE) recently issued DOE Order 5820.2, which provides new policy and guidelines for the management of radioactive wastes. To ensure that SWSA-6 complies with this Order it will be necessary to establish whether sufficient data on the geology, hydrology, soils, and climatology of SWSA-6 exist, and to develop plans to obtain any additional information required. It will also be necessary to establish a source term from the buried waste and provide geochemical information for hydrologic and dosimetric calculations. Where data gaps exist, methodology for obtaining this information must be developed. The purpose of this Plan is to review existing information on SWSA-6 and develop cost estimates and schedules for obtaining any required additional information. Routine operation of SWSA-6 was initiated in 1973, and it is estimated that about 29,100 m 3 (1,000,000 ft 3 ) of LLW containing about 250,000 Ci of radioactivity have been buried through 1984. Since SWSA-6 was sited prior to enactment of current disposal regulations, a detailed site survey of the geologic and hydrologic properties of the site was not performed before wastes were buried. However, during the operation of SWSA-6 some information on site characteristics has been collected

  13. Rapid Automated Mission Planning System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed innovation is an automated UAS mission planning system that will rapidly identify emergency (contingency) landing sites, manage contingency routing, and...

  14. 10 CFR 63.161 - Emergency plan for the geologic repository operations area through permanent closure.

    Science.gov (United States)

    2010-01-01

    ... Planning Criteria § 63.161 Emergency plan for the geologic repository operations area through permanent... 10 Energy 2 2010-01-01 2010-01-01 false Emergency plan for the geologic repository operations area... may occur at the geologic repository operations area, at any time before permanent closure and...

  15. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...

  16. Thomas Aquinas on Contingency of Nature

    Czech Academy of Sciences Publication Activity Database

    Dvořák, Petr

    2008-01-01

    Roč. 5, č. 2 (2008), s. 185-196 ISSN 1214-8407 R&D Projects: GA AV ČR(CZ) IAA900090602 Institutional research plan: CEZ:AV0Z90090514 Keywords : Thomas Aquinas * determinism * contingency Subject RIV: AA - Philosophy ; Religion

  17. 78 FR 35957 - Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska...

    Science.gov (United States)

    2013-06-14

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAKF030.16100000.DO0000.LXSILCYK0000] Notice of Intent To Prepare a Resource Management Plan for the Central Yukon Planning Area Alaska and... management. 8. The RMP will be consistent with the Bureau's H-1601-1 Land Use Planning Handbook, Appendix C...

  18. 77 FR 40081 - Gulf of Mexico, Outer Continental Shelf (OCS), Western Planning Area (WPA) and Central Planning...

    Science.gov (United States)

    2012-07-06

    ... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management Gulf of Mexico, Outer Continental Shelf (OCS), Western Planning Area (WPA) and Central Planning Area (CPA), Oil and Gas Lease Sales for 2012-2017 AGENCY: Bureau of Ocean Energy Management (BOEM), Interior. ACTION: Notice of availability...

  19. Financial Management: DoD Process for Reporting Contingent Legal Liabilities

    National Research Council Canada - National Science Library

    Granetto, Paul J; Marsh, Patricia A; Peek, Marvin L; Brittingham, Scott S; Baidridge, Denise E; Egu, Charles O; Schenck, Kristy M; Adams, Carl L; Reiser, Cheri L

    2006-01-01

    ... contingent liabilities should read this report. It identifies areas where DoD and its Components have not fully complied with Federal financial accounting standards and are not consistent in computing and disclosing contingent legal liabilities...

  20. Groundwater screening evaluation/monitoring plan: 200 Area Treated Effluent Disposal Facility (Project W-049H). Revision 1

    International Nuclear Information System (INIS)

    Barnett, D.B.; Davis, J.D.; Collard, L.B.; Freeman, P.B.; Chou, C.J.

    1995-05-01

    This report consists of the groundwater screening evaluation required by Section S.8 of the State Waste Discharge Permit for the 200 Area TEDF. Chapter 1.0 describes the purpose of the groundwater monitoring plan. The information in Chapter 2.0 establishes a water quality baseline for the facility and is the groundwater screening evaluation. The following information is included in Chapter 2.0: Facility description;Well locations, construction, and development data; Geologic and hydrologic description of the site and affected area; Ambient groundwater quality and current use; Water balance information; Hydrologic parameters; Potentiometric map, hydraulic gradients, and flow velocities; Results of infiltration and hydraulic tests; Groundwater and soils chemistry sampling and analysis data; Statistical evaluation of groundwater background data; and Projected effects of facility operation on groundwater flow and water quality. Chapter 3.0 defines, based on the information in Chapter 2.0, how effects of the TEDF on the environment will be evaluated and how compliance with groundwater quality standards will be documented in accordance with the terms and conditions of the permit. Chapter 3.0 contains the following information: Media to be monitored; Wells proposed as the point of compliance in the uppermost aquifer; Basis for monitoring well network and evidence of monitoring adequacy; Contingency planning approach for vadose zone monitoring wells; Which field parameters will be measured and how measurements will be made; Specification of constituents to be sampled and analyzed; and Specification of the sampling and analysis procedures that will be used. Chapter 4.0 provides information on how the monitoring results will be reported and the proposed frequency of monitoring and reporting. Chapter 5.0 lists all the references cited in this monitoring plan. These references should be consulted for additional or more detailed information

  1. Contingencies of Value

    DEFF Research Database (Denmark)

    Strandvad, Sara Malou

    2014-01-01

    Based on a study of the admission test at a design school, this paper investigates the contingencies of aesthetic values as these become visible in assessment practices. Theoretically, the paper takes its starting point in Herrnstein Smith’s notion of ‘contingencies of values’ and outlines...... a pragmatist ground where cultural sociology and economic sociology meet. Informed by the literature on cultural intermediaries, the paper discusses the role of evaluators and the devices which accompany them. Whereas studies of cultural intermediaries traditionally apply a Bourdieusian perspective, recent......, the paper does not accept this storyline. As an alternative, the paper outlines the contingencies of values which are at play at the admission test, composed of official assessment criteria and scoring devices together with conventions within the world of design, and set in motion by interactions...

  2. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Science.gov (United States)

    2011-01-20

    ... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...

  3. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Science.gov (United States)

    2011-04-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO--0315-696; 8145-8B90-SZM] Dog... Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan and Environmental Impact Statement (Plan/DEIS). The Plan...

  4. Improving the key biodiversity areas approach for effective conservation planning

    CSIR Research Space (South Africa)

    Knight, AT

    2007-03-01

    Full Text Available The key biodiversity areas (KBA) approach aims to identify globally important areas for species conservation. Although a similar methodology has been used successfully to identify important Bird Areas, the authors have identified five limitations...

  5. 78 FR 63481 - Therapeutic Area Standards Initiative Project Plan; Availability

    Science.gov (United States)

    2013-10-24

    ... disadvantages of current and emerging alternatives for the exchange of regulated study data, and (2) issuing a... primary document for guiding all major aspects of FDA's multi-year initiative to develop and implement TA... is announcing the availability of the TA Project Plan. This TA Project Plan will be the primary...

  6. Area-based initiatives - Engines of planning and policy innovation?

    DEFF Research Database (Denmark)

    Agger, Annika; Norvig Larsen, Jacob

    studies of local planning culture change are discussed. Main findings are that during the past two decades a general change in planning culture has developed gradually, triggered by urban regeneration full scale experimentation with place-based approaches. Second, planners as well as public administrators...... and development in planning culture turns out to be a more substantial result than the reduction of social exclusion and economic deprivation. The paper analyses all available official evaluation studies of Danish place-based urban policy initiatives from mid-1990s through 2010. In addition to this, recent...... attitude towards the involvement of local citizens and stakeholders is significantly transformed. While earlier, public participation in planning was mostly restricted to what was lawfully mandatory, the new turn in planning culture demonstrates a practice that goes much further in involving citizens...

  7. Application of the double-contingency principle within BNFL

    International Nuclear Information System (INIS)

    Strafford, P.I.D.

    1995-01-01

    Historically, the double-contingency principle has been used for criticality assessment within British Nuclear Fuels plc (BNFL). This paper outlines what is understood by the double-contingency principle to illustrate how it is applied in criticality safety assessments and to highlight various problem areas that are encountered and, where possible, how they might be solved

  8. State and Urban Area Homeland Security Plans and Exercises: Issues for the 110th Congress

    National Research Council Canada - National Science Library

    Reese, Shawn

    2007-01-01

    ... for both terrorist attacks and natural disasters. Two potential activities that Congress might choose to focus on are the certification of state and urban area homeland security plans and the conduct of exercises to test the plans...

  9. State and Urban Area Homeland Security Plans and Exercises: Issues for the 109th Congress

    National Research Council Canada - National Science Library

    Reese, Shawn

    2006-01-01

    ... for both terrorist attacks and natural disasters. Two potential activities that Congress might choose to focus on are the certification of state and urban area homeland security plans, and the conduct of exercises to test the plans...

  10. Contingent valuation and incentives

    Science.gov (United States)

    Patricia A. Champ; Nicholas E. Flores; Thomas C. Brown; James Chivers

    2002-01-01

    We empirically investigate the effect of the payment mechanism on contingent values by asking a willingness-to-pay question with one of three different payment mechanisms: individual contribution, contribution with provision point, and referendum. We find statistical evidence of more affirmative responses in the referendum treatment relative to the individual...

  11. Supervisory Styles: A Contingency Framework

    Science.gov (United States)

    Boehe, Dirk Michael

    2016-01-01

    While the contingent nature of doctoral supervision has been acknowledged, the literature on supervisory styles has yet to deliver a theory-based contingency framework. A contingency framework can assist supervisors and research students in identifying appropriate supervisory styles under varying circumstances. The conceptual study reported here…

  12. Contingency diagrams as teaching tools

    OpenAIRE

    Mattaini, Mark A.

    1995-01-01

    Contingency diagrams are particularly effective teaching tools, because they provide a means for students to view the complexities of contingency networks present in natural and laboratory settings while displaying the elementary processes that constitute those networks. This paper sketches recent developments in this visualization technology and illustrates approaches for using contingency diagrams in teaching.

  13. 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program

    International Nuclear Information System (INIS)

    Knepp, A. J.

    1999-01-01

    The 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program (Implementation Plan) addresses approximately 700 soil waste sites (and associated structures such as pipelines) resulting from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs,burial grounds) in the 200 Areas and assigned to the Environmental Restoration Program. The Implementation Plan outlines the framework for implementing assessment activities in the 200 Areas to ensure consistency in documentation, level of characterization, and decision making. The Implementation Plan also consolidates background information and other typical work plan materials, to serve as a single referenceable source for this type of information

  14. Lake Mead National Recreational Area air tour management plan and planning and National Environmental Policy Act scoping document

    Science.gov (United States)

    2004-04-19

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Lake Mead National Recreation Area (LAME) pursuant to the National Parks Air Tour ...

  15. State and Urban Area Homeland Security Strategy v3.0: Evolving Strategic Planning

    National Research Council Canada - National Science Library

    Chen, Darren

    2006-01-01

    This thesis proposes to overhaul the state and urban area homeland security strategy program by improving the strategic planning process guidance and assistance and strategy review in collaboration...

  16. Readiness Assessment Plan, Hanford 200 areas treated effluent disposal facilities

    International Nuclear Information System (INIS)

    Ulmer, F.J.

    1995-01-01

    This Readiness Assessment Plan documents Liquid Effluent Facilities review process used to establish the scope of review, documentation requirements, performance assessment, and plant readiness to begin operation of the Treated Effluent Disposal system in accordance with DOE-RLID-5480.31, Startup and Restart of Facilities Operational Readiness Review and Readiness Assessments

  17. Stormwater Pollution Prevention Plan TA-60 Roads and Grounds Facility and Associated Sigma Mesa Staging Area

    Energy Technology Data Exchange (ETDEWEB)

    Sandoval, Leonard Frank [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-02-01

    This Stormwater Pollution Prevention Plan (SWPPP) is applicable to operations at the Technical Area -60 (TA-60) Roads and Grounds Facility and Associated Sigma Mesa Staging Area off Eniwetok Drive, in Los Alamos County, New Mexico.

  18. 75 FR 64675 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Science.gov (United States)

    2010-10-20

    ...'s Approval of the El Paso Section 110(a)(1) Maintenance Plan for the 1997 8-Hour Ozone Standard... BPA State Implementation Plan (SIP), a 1997 8-hour ozone maintenance plan that includes a 2021 Motor... the 1997 8-hour ozone standard for the El Paso 1997 8-hour attainment area. DATES: Effective Date...

  19. A Planning Model for the Development of Programs for Abused and Neglected Children in Rural Areas.

    Science.gov (United States)

    Chamberlain, William A.

    Described are planning steps involved in developing programs for abused and neglected children in rural areas. Among barriers cited are economic factors and resistance to social planning. Emphasized is the need for congruence among local and regional agencies and organizations. Analyzed are six planning stages: entry, in which consultants gain…

  20. Special Analysis: Disposal Plan for Pit 38 at Technical Area 54, Area G

    Energy Technology Data Exchange (ETDEWEB)

    French, Sean B. [Los Alamos National Laboratory; Shuman, Rob [URS Coporation

    2012-06-26

    been made to utilize the remaining disposal capacity within MDA G to the greatest extent possible. One approach for doing this has been to dispose of low-activity waste from cleanup operations at LANL in the headspace of selected disposal pits. Waste acceptance criteria (WAC) for the material placed in the headspace of pits 15, 37, and 38 have been developed (LANL, 2010) and the impacts of placing waste in the headspace of these units has been evaluated (LANL, 2012a). The efforts to maximize disposal efficiency have taken on renewed importance because of the disposal demands placed on MDA G by the large volumes of waste that are being generated at LANL by cleanup efforts. For example, large quantities of waste were recently generated by the retrieval of waste formerly disposed of at TA-21, MDA B. A portion of this material has been disposed of in the headspace of pit 38 in compliance with the WAC developed for that disposal strategy; a large amount of waste has also been sent to off-site facilities for disposal. Nevertheless, large quantities of MDA B waste remain that require disposal. An extension of pit 38 was proposed to provide the disposal capacity that will be needed to dispose of institutional waste and MDA B waste through 2013. A special analysis was prepared to evaluate the impacts of the pit extension (LANL, 2012b). The analysis concluded that the disposal unit could be extended with modest increases in the exposures projected for the Area G performance assessment and composite analysis, as long as limits were placed on the radionuclide concentrations in the waste that is placed in the headspace of the pit. Based, in part, on the results of the special analysis, the extension of pit 38 was approved and excavation of the additional disposal capacity was started in May 2012. The special analysis presented here uses performance modeling to identify a disposal plan for the placement of waste in pit 38. The modeling uses a refined design of the disposal unit and

  1. Special Analysis: Disposal Plan for Pit 38 at Technical Area 54, Area G

    International Nuclear Information System (INIS)

    French, Sean B.; Shuman, Rob

    2012-01-01

    have been made to utilize the remaining disposal capacity within MDA G to the greatest extent possible. One approach for doing this has been to dispose of low-activity waste from cleanup operations at LANL in the headspace of selected disposal pits. Waste acceptance criteria (WAC) for the material placed in the headspace of pits 15, 37, and 38 have been developed (LANL, 2010) and the impacts of placing waste in the headspace of these units has been evaluated (LANL, 2012a). The efforts to maximize disposal efficiency have taken on renewed importance because of the disposal demands placed on MDA G by the large volumes of waste that are being generated at LANL by cleanup efforts. For example, large quantities of waste were recently generated by the retrieval of waste formerly disposed of at TA-21, MDA B. A portion of this material has been disposed of in the headspace of pit 38 in compliance with the WAC developed for that disposal strategy; a large amount of waste has also been sent to off-site facilities for disposal. Nevertheless, large quantities of MDA B waste remain that require disposal. An extension of pit 38 was proposed to provide the disposal capacity that will be needed to dispose of institutional waste and MDA B waste through 2013. A special analysis was prepared to evaluate the impacts of the pit extension (LANL, 2012b). The analysis concluded that the disposal unit could be extended with modest increases in the exposures projected for the Area G performance assessment and composite analysis, as long as limits were placed on the radionuclide concentrations in the waste that is placed in the headspace of the pit. Based, in part, on the results of the special analysis, the extension of pit 38 was approved and excavation of the additional disposal capacity was started in May 2012. The special analysis presented here uses performance modeling to identify a disposal plan for the placement of waste in pit 38. The modeling uses a refined design of the disposal unit

  2. 40 CFR 51.902 - Which classification and nonattainment area planning provisions of the CAA shall apply to areas...

    Science.gov (United States)

    2010-07-01

    ... area planning provisions of the CAA shall apply to areas designated nonattainment for the 8-hour NAAQS? 51.902 Section 51.902 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Implementation of 8-hour Ozone National Ambient Air Quality Standard § 51.902 Which classification and...

  3. Social Sensorimotor Contingencies

    OpenAIRE

    Bütepage, Judith

    2016-01-01

    As the field of robotics advances, more robots are employed in our everyday environment. Thus, the implementation of robots that can actively engage in physical collaboration and naturally interact with humans is of high importance. In order to achieve this goal, it is necessary to study human interaction and social cognition and how these aspects can be implemented in robotic agents. The theory of social sensorimotor contingencies hypothesises that many aspects of human-human interaction de...

  4. Functional and planning structures of education institutions areas

    OpenAIRE

    Соколова, Юлія Віталіївна; Ковальська, Гелена Леонідівна

    2014-01-01

    The article discusses the main aspects of functional and planning organization of the education institutions. The features of the schools stationing in the city structure and its future extension are also defined. The major functional subdivisions are considered and the role of each of it in the education institution structure is investigated. The ratio of the functional zones depending on the specialization of educational institution is determined. The advantages of the functional zone coope...

  5. Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    International Nuclear Information System (INIS)

    Lewis, Michael G.

    2016-01-01

    This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

  6. Quality Assurance Project Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Michael G. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-10-01

    This quality assurance project plan describes the technical requirements and quality assurance activities of the environmental data collection/analyses operations to close Central Facilities Area Sewage treatment Plant Lagoon 3 and the land application area. It describes the organization and persons involved, the data quality objectives, the analytical procedures, and the specific quality control measures to be employed. All quality assurance project plan activities are implemented to determine whether the results of the sampling and monitoring performed are of the right type, quantity, and quality to satisfy the requirements for closing Lagoon 3 and the land application area.

  7. 200 Area effluent treatment facility process control plan 98-02

    International Nuclear Information System (INIS)

    Le, E.Q.

    1998-01-01

    This Process Control Plan (PCP) provides a description of the background information, key objectives, and operating criteria defining Effluent Treatment Facility (ETF) Campaign 98-02 as required per HNF-IP-0931 Section 37, Process Control Plans. Campaign 98-62 is expected to process approximately 18 millions gallons of groundwater with an assumption that the UP-1 groundwater pump will be shut down on June 30, 1998. This campaign will resume the UP-1 groundwater treatment operation from Campaign 97-01. The Campaign 97-01 was suspended in November 1997 to allow RCRA waste in LERF Basin 42 to be treated to meet the Land Disposal Restriction Clean Out requirements. The decision to utilize ETF as part of the selected interim remedial action of the 200-UP-1 Operable Unit is documented by the Declaration of the Record of Decision, (Ecology, EPA and DOE 1997). The treatment method was chosen in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), the Hanford Federal Facility Agreement and Consent Order (known as the Tri-Party Agreement or TPA), and to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP)

  8. Are master plans effective in limiting development in China's disaster-prone areas?

    OpenAIRE

    Kim, Saehoon; Rowe, Peter G.

    2013-01-01

    The effectiveness of urban master plans in limiting development in a disaster-prone area of China was empirically investigated by measuring cities’ land-cover changes against their master plans. If a master plan serves as guidance for urban polices that reduce property loss from earthquakes, floods, landslides,land subsidence, and rises in sea level, it will substantially limit urban development in areas at risk from environmental hazards. An environmental risk map weighted toward valuable...

  9. Groundwater Monitoring Plan for the Z-Area Saltstone Facility

    International Nuclear Information System (INIS)

    Wells, D.

    2002-01-01

    Groundwater monitoring has been conducted at the Z-Area Saltstone Disposal Facility since 1987. At that time, groundwater monitoring was not required by the industrial landfill regulations, but a modest monitoring program was required by the operating permit. In 1996 SRS proposed a program based on direct push sampling. This program called for biennial direct push sampling within 25 feet of each waste-containing cell with additional samples being taken in areas where excessive cracking had been observed. The direct push proposal was accepted by The South Carolina Department of Health and Environmental Control (SCDHEC). The Industrial Solid Waste Landfill Regulations were revised in 1998 and now include requirements for groundwater monitoring. The major elements of those regulations and their application at Z-Area are discussed. These are a point of compliance, groundwater protection standards, the groundwater monitoring system, sampling and analysis, and data evaluation and reporting

  10. Wilmington Area Planning Council, New Castle County, Delaware and Cecil County, Maryland : a performance-based approach to integrating congestion management into the metropolitan planning process

    Science.gov (United States)

    2009-04-01

    The Wilmington Area Planning Council takes an objectives-driven, performance-based approach to its metropolitan transportation planning, including paying special attention to integrating its Congestion Management Process into its planning efforts. Th...

  11. Consolidation of Contingency Data and Its Use in Computer Graphics to Plan Bare Base Facility Construction at a Forward Operating Location.

    Science.gov (United States)

    1983-09-01

    a number of Harvest Eagle kits positioned in Europe and the Pacific theaters (12). Harvest Bare, a prepackaged kit of prefabricated expandable...Environmental Studies. San Diego University. Ecological Assessment of Vandenberg Air Force Base, California. Volume III. Environ- mental Planning System

  12. Social Area Analysis in Program Evaluation and Planning.

    Science.gov (United States)

    Piasecki, Joseph R.; Kamis-Gould, Edna

    1981-01-01

    Social area analysis (SAA) is defined, and its conceptual roots and principal applications identified. The utility of SAA is assessed by reviewing use of demographic data among several disciplines. Authors review seminal and recent contributions to the field. Ecological fallacies and other problematic facets of SAA are considered. (Author/DWH)

  13. Puget Sound Area Electric Reliability Plan : Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, and during certain conditions, there is more demand for power in the Puget Sound area than the transmission system and existing generation can reliably supply. This high demand, called peak demand occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both.

  14. Contingency Management of Health Care Organizations: It Depends.

    Science.gov (United States)

    Olden, Peter C

    Managers in health care organizations (HCOs) must perform many processes and activities, such as planning goals, designing organization structure, leading people, motivating employees, making decisions, and resolving conflict. How they do all this strongly affects the performance and outcomes of their organizations and themselves. Some managers develop a usual way of performing their jobs and achieve some success with a preferred method of leading or a favorite approach to motivating. However, their success will be limited if they always rely on a standard "1-size-fits-all" approach. This is because contingency factors influence the effectiveness of a given approach to managing. The "best" approach depends on contingency factors, including the situation and the people involved. Managers should choose an approach to fit with the changing contingency factors. This article explains why and how managers should develop a contingency approach to managing HCOs. The development of contingency theory is briefly described. Practical application of contingency management is explained for leading, motivating, decision making, and resolving conflict. By using a contingency approach, managers can be more effective when managing their HCOs.

  15. Carlsbad Area Office Waste Isolation Division Transition Plan

    International Nuclear Information System (INIS)

    1994-01-01

    In October 1993, the US Department of Energy (DOE) announced the Revised Test Strategy for the Waste Isolation Pilot Plant (WIPP). The new strategy involves conducting additional radioactive waste tests in laboratories instead of the underground at the WIPP. It will likely result in an acceleration of regulatory compliance activities needed for a disposal decision, which could result in permanent disposal of transuranic waste earlier than the previous test program and regulatory compliance strategy. The Revised Test Strategy changes the near-term program activities for the WIPP site. The revised strategy deletes radioactive waste tests at the WIPP, prior to completing all activities for initiating disposal operations, and consequently the need to maintain readiness to receive waste in the near-term. However, the new strategy enables the DOE to pursue an earlier disposal decision, supported by an accelerated regulatory compliance strategy. With the new strategy, the WIPP must prepare for disposal operations in early 1998. This Westinghouse Waste Isolation Division (WID) Transition Plan addresses the WID programmatic, budgetary, and personnel changes to conform to the Revised Test Strategy, and to support the accelerated compliance strategy and earlier disposal operations at the WIPP

  16. 77 FR 16447 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Science.gov (United States)

    2012-03-21

    ... County, Western Mojave Desert, South Coast Air Basin, Eastern Kern County, and San Diego County. DATES... April 30, 2004 final rule, we designated the Western Mojave Desert area as a moderate nonattainment area... reclassification of several areas for the 1997 8-hour ozone standard. See 75 FR 24409 (May 5, 2010). The Western...

  17. 300 area solvent evaporator interim status closure plan: Revision 2

    International Nuclear Information System (INIS)

    1989-02-01

    This document describes activities for the closure of a hazardous waste tank treatment facility operated by the US Department of Energy-Richland Operations Office (DOE-RL) and co-operated by the Westinghouse Hanford Company (WHC). This treatment facility was a solvent evaporator located in the 300 Area of the Hanford Site, from 1975 to 1985 on behalf of DOE-RL. The 300 Area Solvent Evaporator (300 ASE) was a modified load lugger (dumpster) in which solvent wastes were evaporated. Some of the solvents were radioactively contaminated because they came from a degreaser which processed bare uranium metal billets from the N Reactor Fuel Manufacturing Facility. The waste was composed of perchloroethylene, trichloroethylene, 1,1,1-trichloroethane, ethyl acetate/bromine solution, paint shop solvents and possibly some used oil. Also, small amounts of uranium, copper, zirconium and possibly beryllium were present in the degreaser solvents as particulates. Radioactive and non-radioactive solvents were not segregated in the 300 ASE, and the entire mixture was regarded as mixed waste

  18. Tanks focus area multiyear program plan FY97-FY99

    International Nuclear Information System (INIS)

    1996-08-01

    The U.S. Department of Energy (DOE) continues to face a major tank remediation problem with approximately 332 tanks storing over 378,000 ml of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Most of the tanks have significantly exceeded their life spans. Approximately 90 tanks across the DOE complex are known or assumed to have leaked. Some of the tank contents are potentially explosive. These tanks must be remediated and made safe. How- ever, regulatory drivers are more ambitious than baseline technologies and budgets will support. Therefore, the Tanks Focus Area (TFA) began operation in October 1994. The focus area manages, coordinates, and leverages technology development to provide integrated solutions to remediate problems that will accelerate safe and cost-effective cleanup and closure of DOE's national tank system. The TFA is responsible for technology development to support DOE's four major tank sites: Hanford Site (Washington), INEL (Idaho), Oak Ridge Reservation (ORR) (Tennessee), and Savannah River Site (SRS) (South Carolina). Its technical scope covers the major functions that comprise a complete tank remediation system: safety, characterization, retrieval, pretreatment, immobilization, and closure

  19. A/M Area Vadose Zone Monitoring Plan (U)

    International Nuclear Information System (INIS)

    Kupar, J.; Jarosch, T.R.; Jackson, D.G. Jr.; Looney, B.B.; Jerome, K.M.; Riha, B.D.; Rossabi, J.; Van Pelt, R.S.

    1998-03-01

    Characterization and monitoring data from implementation and the first two and one half years of vadose zone remediation operations indicate that this activity has substantially improved the performance of the A/M Area Groundwater Corrective Action Program. During this period, vadose zone remediation removed approximately 225, 000 lbs (100,000 Kg) of chlorinated solvents (CVOCs) from the subsurface. Further, vadose zone remediation system operation increased the overall CVOC removal rate of the A/M Area Groundwater Corrective Action by 300% to 500% during this period versus the groundwater pump and treat system along. Various support activities have been performed to support operation and documentation of performance of the vadose zone remediation system. These activities address performance of existing systems (contaminant distributions, zone of influence, and process monitoring data), evaluation of suspect sources, evaluation of alternative/enhancement technologies, and initial development of remediation goals. In particular, the most recent A/M vadose zone remediation support activities (described in WSRC-RP-97-109) were completed and the results provide key documentation about system performance

  20. B Plant Complex generator dangerous waste storage areas inspection plan: Revision 1

    International Nuclear Information System (INIS)

    Beam, T.G.

    1994-01-01

    This document contains the inspection plan for the <90 day dangerous/mixed waste storage areas and satellite accumulation areas at B Plant Complex. This inspection plan is designed to comply with all applicable federal, state and US Department of Energy-Richland Operations Office training requirements. In particular, the requirements of WAC 173-303 ''Dangerous Waste Regulations'' are met by this inspection plan. This inspection plan is designed to provide B Plant Complex with the records and documentation showing that the waste storage and handling program is in compliance with applicable regulations. The plan also includes the requirements for becoming a qualified inspector of waste storage areas and the responsibilities of various individuals and groups at B Plant Complex

  1. 300 Area Treated Effluent Disposal Facility permit reopener run plan

    International Nuclear Information System (INIS)

    Olander, A.R.

    1995-01-01

    The 300 Area Treated Effluent Disposal Facility (TEDF) is authorized to discharge treated effluent to the Columbia River by National Pollutant Discharge Elimination System permit WA-002591-7. The letter accompanying the final permit noted the following: EPA recognizes that the TEDF is a new waste treatment facility for which full scale operation and effluent data has not been generated. The permit being issued by EPA contains discharge limits that are intended to force DOE's treatment technology to the limit of its capability.'' Because of the excessively tight limits the permit contains a reopener clause which may allow limits to be renegotiated after at least one year of operation. The restrictions for reopening the permit are as follows: (1) The permittee has properly operated and maintained the TEDF for a sufficient period to stabilize treatment plant operations, but has nevertheless been unable to achieve the limitation specified in the permit. (2) Effluent data submitted by the permittee supports the effluent limitation modifications(s). (3) The permittee has submitted a formal request for the effluent limitation modification(s) to the Director. The purpose of this document is to guide plant operations for approximately one year to ensure appropriate data is collected for reopener negotiations

  2. Underground test area subproject waste management plan. Revision No. 1

    International Nuclear Information System (INIS)

    1996-08-01

    The Nevada Test Site (NTS), located in southern Nevada, was the site of 928 underground nuclear tests conducted between 1951 and 1992. The tests were performed as part of the Atomic Energy Commission and U.S. Department of Energy (DOE) nuclear weapons testing program. The NTS is managed by the DOE Nevada Operations Office (DOE/NV). Of the 928 tests conducted below ground surface at the NTS, approximately 200 were detonated below the water table. As an unavoidable consequence of these testing activities, radionuclides have been introduced into the subsurface environment, impacting groundwater. In the few instances of groundwater sampling, radionuclides have been detected in the groundwater; however, only a very limited investigation of the underground test sites and associated shot cavities has been conducted to date. The Underground Test Area (UGTA) Subproject was established to fill this void and to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the NTS. One of its primary objectives is to gather data to characterize the deep aquifer underlying the NTS

  3. Alternative Forms of Fit in Contingency Theory.

    Science.gov (United States)

    Drazin, Robert; Van de Ven, Andrew H.

    1985-01-01

    This paper examines the selection, interaction, and systems approaches to fit in structural contingency theory. The concepts of fit evaluated may be applied not only to structural contingency theory but to contingency theories in general. (MD)

  4. NOAA ESRI Grid - sediment size predictions model in New York offshore planning area from Biogeography Branch

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset represents sediment size predictions from a sediment spatial model developed for the New York offshore spatial planning area. The model also includes...

  5. NOAA ESRI Grid - depth predictions bathymetry model in New York offshore planning area from Biogeography Branch

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset represents depth predictions from a bathymetric model developed for the New York offshore spatial planning area. The model also includes...

  6. Transportation Management Area Planning Certification Review Primer: Revised January 18, 2018

    Science.gov (United States)

    2018-01-18

    This primer outlines key concepts and expectations of a Transportation Management Area (TMA) Planning Certification Review. Reflecting on the collective experiences of past Certification Reviews, this includes references to relevant laws and regulati...

  7. NOAA ESRI Shapefile - sediment composition class predictions in New York offshore planning area from Biogeography Branch

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset represents sediment composition class predictions from a sediment spatial model developed for the New York offshore spatial planning area. The...

  8. 200 area liquid effluent facility quality assurance program plan. Revision 1

    International Nuclear Information System (INIS)

    Sullivan, N.J.

    1995-01-01

    Direct revision of Supporting Document WHC-SD-LEF-QAPP-001, Rev. 0. 200 Area Liquid Effluent Facilities Quality Assurance Program Plan. Incorporates changes to references in tables. Revises test to incorporate WHC-SD-LEF-CSCM-001, Computer Software Configuration Management Plan for 200 East/West Liquid Effluent Facilities

  9. Associate Directorate Environmental Management Infrastructure Plan for Area G and Area L Domes

    International Nuclear Information System (INIS)

    Stevens, Patrice Ann; Baumer, Andrew Ronald

    2016-01-01

    Technical Area 54, at Los Alamos National Laboratory (LANL) is situated in the east-central portion of the Laboratory on the Mesita del Buey between Pajarito Canyon to the south and Canada del Buey to the north. TA-54 includes four MDAs designated as G, H, J, and L; a waste characterization, container storage, and transfer facility; active TRU waste and MLLW waste storage and low-level waste (LLW) disposal operations at Area G; active hazardous and mixed low-level (MLLW) waste storage operations at Area L; and administrative and support areas. MDA J has previously under-gone closure. Area G is a waste management and disposal area, used for the disposal and storage of radioactive wastes since 1957. Since August 2015, Area G has been in warm standby and provides minimal operations to support safety, compliance, and nitrate salt remediation. Located within Area G, MDA G covers 63-acres. MDA G contains 334 active and inactive waste management units, which include 36 pits, 294 shafts, and 4 trenches. In 1971, Area G began use for the retrievable storage of TRU waste. There are two pits, four trenches and 60 shafts that contain retrievable TRU waste. Thirty-three of the shafts contain TRU waste that may present unique problems for retrieval. In 1986, segregation of MLLW was initiated at Area G for treatment and temporary storage or for off-site disposal. Area G is the only active LLW disposal facility at the Laboratory. Current operations at Area G include storage and characterization of TRU and mixed TRU waste destined for off-site disposal at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico and the storage of MLLW destined for off-site treatment and/or disposal. Several above-ground container storage units (CSUs) are currently used for storage of containerized MLLW and/or mixed TRU wastes. These consist of asphalt pads and associated fabric domes or other structures. As defined by the Consent Order, MDA G contains 229 of the 334 subsurface waste

  10. Associate Directorate Environmental Management Infrastructure Plan for Area G and Area L Domes

    Energy Technology Data Exchange (ETDEWEB)

    Stevens, Patrice Ann [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Baumer, Andrew Ronald [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-09-26

    Technical Area 54, at Los Alamos National Laboratory (LANL) is situated in the east-central portion of the Laboratory on the Mesita del Buey between Pajarito Canyon to the south and Cañada del Buey to the north. TA-54 includes four MDAs designated as G, H, J, and L; a waste characterization, container storage, and transfer facility; active TRU waste and MLLW waste storage and low-level waste (LLW) disposal operations at Area G; active hazardous and mixed low-level (MLLW) waste storage operations at Area L; and administrative and support areas. MDA J has previously under-gone closure. Area G is a waste management and disposal area, used for the disposal and storage of radioactive wastes since 1957. Since August 2015, Area G has been in warm standby and provides minimal operations to support safety, compliance, and nitrate salt remediation. Located within Area G, MDA G covers 63-acres. MDA G contains 334 active and inactive waste management units, which include 36 pits, 294 shafts, and 4 trenches. In 1971, Area G began use for the retrievable storage of TRU waste. There are two pits, four trenches and 60 shafts that contain retrievable TRU waste. Thirty-three of the shafts contain TRU waste that may present unique problems for retrieval. In 1986, segregation of MLLW was initiated at Area G for treatment and temporary storage or for off-site disposal. Area G is the only active LLW disposal facility at the Laboratory. Current operations at Area G include storage and characterization of TRU and mixed TRU waste destined for off-site disposal at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico and the storage of MLLW destined for off-site treatment and/or disposal. Several above-ground container storage units (CSUs) are currently used for storage of containerized MLLW and/or mixed TRU wastes. These consist of asphalt pads and associated fabric domes or other structures. As defined by the Consent Order, MDA G contains 229 of the 334 subsurface waste

  11. Underground Test Area Activity Communication/Interface Plan, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro, Las Vegas, NV (United States); Rehfeldt, Kenneth [Navarro, Las Vegas, NV (United States)

    2016-10-01

    The purpose of this plan is to provide guidelines for effective communication and interfacing between Underground Test Area (UGTA) Activity participants, including the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) and its contractors. This plan specifically establishes the following: • UGTA mission, vision, and core values • Roles and responsibilities for key personnel • Communication with stakeholders • Guidance in key interface areas • Communication matrix

  12. Contingent Conspiracies: Art, Philosophy, Science

    DEFF Research Database (Denmark)

    Wilson, Alexander

    2013-01-01

    The question of whether creativity comes from being “open” or “closed” to contingent processes, deeply intersects art-historical discourse on authorship, style, technique and practice: from the Greek notion of the Daimon, through commedia dell'arte’s improvised styles and romanticism’s investment......, Hegel) contain a deeper tension between contingency and necessity, often revealed in correlate discussions of the sublime. But as artists find themselves returning again to a concern or care for contingency (a thread running through Heidegger, Levinas and Derrida) or the question how to conspire...... with contingency (Negarestani), they do so today with a new paradigm of scientific knowledge at their disposal. For science too has increasingly been forced to respond to the notion of contingency. Progressively discovering the ubiquity of non-linear dynamics, deterministic chaos and emergent complexity...

  13. Corrective action plan for CAU Number 339: Area 12 Fleet Operations, Steam Cleaning Discharge Area, Nevada Test Site

    International Nuclear Information System (INIS)

    1997-05-01

    The purpose of this Corrective Action Plan (CAP) is to provide the method for implementing the corrective action alternative as provided in the Corrective Action Decision Document (CADD). Detailed information of the site history and results of previous characterizations can be found in the Work Plan, the Preliminary Investigation Report, and the Phase 2 Characterization Report. Previous characterization investigations were completed as a condition of the Temporary Water Pollution Control Permit issued by the Nevada Division of Environmental Protection (NDEP) on July 14, 1992. The scope of this report is to prepare a CAP based upon the selected remedial alternative for closure of the Area 12, Building 12-16 Fleet Operations steam cleaning discharge area. The effluent discharge area has been impacted by volatile organic compounds (VOCs) and total petroleum hydrocarbons (TPH) as oil. The maximum hydrocarbon and VOC concentrations detected in the Preliminary and Phase 2 Site Characterization Investigations are summarized

  14. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  15. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  16. Accounting protesting and warm glow bidding in Contingent Valuation surveys considering the management of environmental goods--an empirical case study assessing the value of protecting a Natura 2000 wetland area in Greece.

    Science.gov (United States)

    Grammatikopoulou, Ioanna; Olsen, Søren Bøye

    2013-11-30

    Based on a Contingent Valuation survey aiming to reveal the willingness to pay (WTP) for conservation of a wetland area in Greece, we show how protest and warm glow motives can be taken into account when modeling WTP. In a sample of more than 300 respondents, we find that 54% of the positive bids are rooted to some extent in warm glow reasoning while 29% of the zero bids can be classified as expressions of protest rather than preferences. In previous studies, warm glow bidders are only rarely identified while protesters are typically identified and excluded from further analysis. We test for selection bias associated with simple removal of both protesters and warm glow bidders in our data. Our findings show that removal of warm glow bidders does not significantly distort WTP whereas we find strong evidence of selection bias associated with removal of protesters. We show how to correct for such selection bias by using a sample selection model. In our empirical sample, using the typical approach of removing protesters from the analysis, the value of protecting the wetland is significantly underestimated by as much as 46% unless correcting for selection bias. Copyright © 2013 Elsevier Ltd. All rights reserved.

  17. Contingent post-closure plan, hazardous waste management units at selected maintenance facilities, US Army National Training Center, Fort Irwin, California

    International Nuclear Information System (INIS)

    1992-01-01

    The National Training Center (NTC) at Fort Irwin, California, is a US Army training installation that provides tactical experience for battalion/task forces and squadrons in a mid- to high-intensity combat scenario. Through joint exercises with US Air Force and other services, the NTC also provides a data source for improvements of training doctrines, organization, and equipment. To meet the training and operational needs of the NTC, several maintenance facilities provide general and direct support for mechanical devices, equipment, and vehicles. Maintenance products used at these facilities include fuels, petroleum-based oils, lubricating grease, various degreasing solvents, antifreeze (ethylene glycol), transmission fluid, brake fluid, and hydraulic oil. Used or spent petroleum-based products generated at the maintenance facilities are temporarily accumulated in underground storage tanks (USTs), collected by the NTC hazardous waste management contractor (HAZCO), and stored at the Petroleum, Oil, and Lubricant (POL) Storage Facility, Building 630, until shipped off site to be recovered, reused, and/or reclaimed. Spent degreasing solvents and other hazardous wastes are containerized and stored on-base for up to 90 days at the NTC's Hazardous Waste Storage Facility, Building 703. The US Environmental Protection Agency (EPA) performed an inspection and reviewed the hazardous waste management operations of the NTC. Inspections indicated that the NTC had violated one or more requirements of Subtitle C of the Resource Conservation and Recovery Act (RCRA) and as a result of these violations was issued a Notice of Noncompliance, Notice of Necessity for Conference, and Proposed Compliance Schedule (NON) dated October 13, 1989. The following post-closure plan is the compliance-based approach for the NTC to respond to the regulatory violations cited in the NON

  18. Safety plan for the cooperative telerobotic retrieval system equipment development area

    Energy Technology Data Exchange (ETDEWEB)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A).

  19. Safety plan for the cooperative telerobotic retrieval system equipment development area

    International Nuclear Information System (INIS)

    Haney, T.J.; Jessmore, J.J.

    1995-07-01

    This plan establishes guidelines to minimize safety risks for the cooperative telerobotic retrieval project at the North Boulevard Annex (NBA). This plan has the dual purpose of minimizing safety risks to workers and visitors and of securing sensitive equipment from inadvertent damage by nonqualified personnel. This goal will be accomplished through physical control of work zones and through assigned responsibilities for project personnel. The scope of this plan is limited to establishing the working zone boundaries and entry requirements, and assigning responsibilities for project personnel. This plan does not supersede current safety organization responsibilities for the Landfill Stabilization Focus Area Transuranic (LSFA TRU) Arid outlined in the Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program; Tenant Manual; Idaho Falls Building Emergency Control Plan;; applicable Company Procedures; the attached Interface Agreement (Appendix A)

  20. 78 FR 16792 - Designation of Areas for Air Quality Planning Purposes; State of California; Imperial Valley...

    Science.gov (United States)

    2013-03-19

    ... (see, e.g., the PM 10 area designations in 40 CFR 81.305 for Coso Junction planning area, Owens Valley..., this action: Is not ``significant regulatory actions'' subject to review by the Office of Management..., 1999); Is not economically significant regulatory actions based on health or safety risks subject to...

  1. 78 FR 4804 - Revision to the Washington State Implementation Plan; Tacoma-Pierce County Nonattainment Area

    Science.gov (United States)

    2013-01-23

    ... Washington State Implementation Plan; Tacoma- Pierce County Nonattainment Area AGENCY: Environmental... Tacoma-Pierce County nonattainment area for the 2006 fine particulate matter (PM 2.5 ) National Ambient... Rules.'' The updated PSCAA rules help implement the recommendations of the Tacoma-Pierce County Clean...

  2. Review of Defence Plans in Europe: Current Status, Strengths and Opportunities

    DEFF Research Database (Denmark)

    De Boeck, Steven; Van Hertem, Dirk; Das, Kaushik

    2016-01-01

    interconnected, a contingency in one area can affect the whole power system and possibly lead to a wide area black out. Therefore adequate defence plans need to be designed and in place to handle these situations. This paper starts with an overview of the terminology used in defence plans. Subsequently...... the current status of defence plans in Europe and the preferred sequence of actions to mitigate contingencies, is given based on a survey conducted among several European TSOs. Furthermore his paper gives an overview of how the ongoing changes with renewables, phasor measurement units (PMUs), power flow...

  3. 78 FR 44494 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Science.gov (United States)

    2013-07-24

    .... See Sierra Club v. EPA, 375 F.3d 537 (7th Cir.2004). The remaining applicable Part D requirements for... PM 10 precursor in the secondary formation of atmospheric ammonium nitrates, which are a significant... insignificant contributor to secondary particulate formation in the Sacramento PM 10 nonattainment area...

  4. 75 FR 13710 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Science.gov (United States)

    2010-03-23

    ... only at the hard copy location (e.g., copyrighted material), and some may not be publicly available in either location (e.g., CBI). To inspect the hard copy materials, please schedule an appointment during... at established state and local air monitoring stations (SLAMS) in the nonattainment area and entered...

  5. Remediation plan for contaminated areas by naturally occurring radioactivity materials in Syrian Petroleum Company oil fields

    International Nuclear Information System (INIS)

    Shweikani, R.; Al-Masri, M. S.; Awad, I.

    2006-01-01

    The present report contains a detailed plan for remediation of areas contaminated with naturally occurring radioactive materials in the syrian Petroleum Company Oil fields. This plan includes a description of the contaminated areas and the procedures that will be followed before and during the execution of the project in addition to the final radiation surveys according to the Syrian regulations. In addition, responsibilities of the main personnel who will carry out the work have been defined and the future monitoring program of the remediated areas was determined. (author)

  6. Remediation plan for contaminated areas by naturally occurring radioactivity materials in Syrian petroleum company oil fields

    International Nuclear Information System (INIS)

    Shwekani, R.; Al-Masri, M.S.; Awad, I.

    2005-08-01

    The present report contains a detailed plan for remediation of areas contaminated with naturally occurring radioactive materials in the Syrian petroleum company oil fields. This plan includes a description of the contaminated areas and the procedures that will be followed before and during the execution of the project in addition to the final radiation surveys according to the Syrian regulations. In addition, responsibilities of the main personnel who will carry out the work have been defined and the future monitoring program of the remediated areas was determined. (author)

  7. Contingency Valuation of Croatian Arboretum Opeka

    Directory of Open Access Journals (Sweden)

    Stjepan Posavec

    2012-12-01

    Full Text Available Background and Purpose: Social aspects of forestry have always been an important factor of forest usage and management, and therefore have significant influence on its sustainability. Non-wood forest functions such as recreation, tourism, aesthetic and educational factors influence development of rural areas. Contingent valuation method has rarely been used for evaluation of protected forest areas. The aim of the article is to estimate the amount of money visitors are willing to pay for nature’s resources preservation in the arboretum Opeka in the North-West Croatia. Material and Methods: Opeka Arboretum is situated in the Vinica municipality in northern Croatia. Located in a large park surrounding a manor, Opeka arboretum, with its 65 hectares is the largest of the three arboretums existing in Croatia today. The arboretum was founded in 1860 by the Count Marko Bombelles. Contingent valuation is a survey-based economic technique for the non-market valuation of resources, such as environmental preservation or the impact of contamination. It is also the approach that can generally be used to include what is usually referred to as the passive use component of the economic value of environmental goods. Results and Conclusion: Willingness to pay for visitor’s use of the arboretum has been investigated using the survey and contingency valuation method on a sample of 53 respondents. Research results present high preference for arboretum benefits such as beauty of landscape, cultural and historical significance, recreation and health but low willingness to pay.

  8. Closure plan for the Test Area North-726 chromate water storage and Test Area North-726A chromate treatment units

    International Nuclear Information System (INIS)

    Smith, P.J.; Van Brunt, K.M.

    1992-11-01

    This document describes the proposed plan for closure of the Test Area North-726 chromate water storage and Test Area North-726A chromate treatment units at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act interim status closure requirements. The location, size, capacity, and history of the units are described, and their current status is discussed. The units will be closed by treating remaining waste in storage, followed by thorough decontamination of the systems. Sufficient sampling and analysis, and documentation of all activities will be performed to demonstrate clean closure

  9. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2008-01-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells

  10. PLANNING IN ALL ITS (DISGUISES: SPHERES OF GOVERNMENT, FUNCTIONAL AREAS AND AUTHORITY

    Directory of Open Access Journals (Sweden)

    Jeannie van Wyk

    2012-12-01

    Full Text Available The Constitution determines that the legislative and executive powers regarding 'regional planning and development', 'urban and rural development', 'provincial planning' and 'municipal planning' are divided among the three spheres of government. Yet the boundaries between these items listed in Schedules 4 and 5 of the Constitution are opaque and their precise content is not always apparent. Overlaps, conflicts and uncertainty may occur. In a number of landmark decisions the courts have provided content to these different functional areas. Clarity on what 'municipal planning' comprises leads to more certainty on the content of the other planning areas. Draft legislation such as the Spatial Planning and Land Use Management Bill (B14-2012 can also assist in adding substance to a demarcation of these different functional areas. Yet uncertainties still remain, occasioned by constitutional provisions such as sections 100, 139(1 and 155(6-(7, that permit intervention by national and provincial government in provinces and municipalities respectively, as well as the support and monitoring by provincial government in respect of municipalities. Few clear solutions are immediately apparent. The role of the constitutional principles of co-operative government where uncertainty and conflict exist is examined, especially where no veto of one sphere over another is possible. Principles of interpretation can also assist in delineating the boundaries of the different functional areas. It seems, however, that the courts will find themselves having to address the remaining inconsistencies.

  11. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2008-09-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  12. Real time uncertainty in fiscal planning and debt accumulation in the euro area

    OpenAIRE

    Paloviita, Maritta

    2012-01-01

    This study explores real time uncertainty in euro area fiscal policies since the late 1990s. Using real time data from the OECD Economic Outlook publications we investigate the impact of real time uncertainty on fiscal planning and debt accumulation separately for two country groups in the euro area: countries in geographical periphery (Greece, Ireland, Italy, Portugal and Spain) and other euro area countries (Austria, Belgium, Finland, France, Germany and the Netherlands). The results indica...

  13. 77 FR 58962 - Approval and Promulgation of Implementation Plans; Arizona; Nogales PM10

    Science.gov (United States)

    2012-09-25

    ... and proposed action on this plan. Then, we provided a brief description of the location and geography... moderate PM 10 nonattainment areas as applied to the Nogales NA, given the area's air quality is influenced... contingency measures, among other requirements, continue to apply to PM 10 nonattainment areas even if the...

  14. Assessing climate change-robustness of protected area management plans-The case of Germany.

    Science.gov (United States)

    Geyer, Juliane; Kreft, Stefan; Jeltsch, Florian; Ibisch, Pierre L

    2017-01-01

    Protected areas are arguably the most important instrument of biodiversity conservation. To keep them fit under climate change, their management needs to be adapted to address related direct and indirect changes. In our study we focus on the adaptation of conservation management planning, evaluating management plans of 60 protected areas throughout Germany with regard to their climate change-robustness. First, climate change-robust conservation management was defined using 11 principles and 44 criteria, which followed an approach similar to sustainability standards. We then evaluated the performance of individual management plans concerning the climate change-robustness framework. We found that climate change-robustness of protected areas hardly exceeded 50 percent of the potential performance, with most plans ranking in the lower quarter. Most Natura 2000 protected areas, established under conservation legislation of the European Union, belong to the sites with especially poor performance, with lower values in smaller areas. In general, the individual principles showed very different rates of accordance with our principles, but similarly low intensity. Principles with generally higher performance values included holistic knowledge management, public accountability and acceptance as well as systemic and strategic coherence. Deficiencies were connected to dealing with the future and uncertainty. Lastly, we recommended the presented principles and criteria as essential guideposts that can be used as a checklist for working towards more climate change-robust planning.

  15. Planning of Agro-Tourism Development, Specific Location in Green Open Space Sarbagita Area, Bali Province

    Science.gov (United States)

    Lanya, I.; Subadiyasa, N.; Sardiana, K.; Ratna Adi, G. P.

    2018-02-01

    Tourism development has a negative impact on agricultural land in Bali, resulted in the transfer of rice field of 800 ha/year. Subak rice field area as a world cultural heritage, requires conservation strategy, increasing economic and environmental value, through integrated agriculture development with tourism. Tourism destination planning in the form of tourist destination (TD) and tourism object (TO) by raising local genius, at specific location, is expected to preserve nature and culture, as well as the economic value of the region. Research Methods: (1) identification of agrarian cultures, (2) field survey, (3) mapping of site specific TD/TO plans, and (4) compile documents of agro-tourism road map based on local genius. Seven subak areas in the green open space area have the potential to develop new TD/TO, namely: (1) Gedon2Subak in Tanah Lot area, is developed for the preservation of agriculture, the implementation of the zoning plan of the sacred, madya and nista areas, (2) the Kerdung and Penatih Subak areas, developed for urban farming in Denpasar City, (3) Cangi south Subak area, built for agro-tourism plasmanutfah banana and Cemagi Let Subak area developed agro-tourism food crops and horticulture, (4) Erjeruk Subak area, developed tourism plasmanutfah coconut.

  16. Transition plan: Project C-018H, 200-E Area Effluent Treatment Facility

    International Nuclear Information System (INIS)

    Connor, M.D.

    1994-01-01

    The purpose of this transition plan is to ensure an orderly transfer of project information to operations to satisfy Westinghouse Hanford Company (WHC) operational requirements and objectives, and ensure safe and efficient operation of Project C-018H, the 200-E Area Effluent Treatment Facility (ETF). This plan identifies the deliverables for Project C-018H upon completion of construction and turnover to WHC for operations, and includes acceptance criteria to objectively assess the adequacy of the contract deliverables in relation to present requirements. The scope of this plan includes a general discussion of the need for complete and accurate design basis documentation and design documents as project deliverables. This plan also proposes that a configuration management plan be prepared to protect and control the transferred design documents and reconstitute the design basis and design requirements, in the event that the deliverables and project documentation received from the contractor are less than adequate at turnover

  17. Planning a tourism landscape in geosite area: Sipiso-piso waterfall

    Science.gov (United States)

    Vinky Rahman, N.; Ginting, Nurlisa; Subhilhar; Narisa, Nindya

    2018-03-01

    Landscape is one of the valuable assets in tourism, especially in rural tourism. Good landscape planning can be increasing the tourism in one place. In Geopark area, landscape planning is also necessary, and it is because geopark area is also a landscape. This paper aims to create a landscape planning concept in Sipiso-Piso Waterfall that can be used to improve the tourism in Sipiso-piso Waterfall. The method that used in this paper is a qualitative method that is used interviews with related stakeholders like, local figure, government, and academic, and field observation in the study area. The data obtained would be analyzed with four elements of landscape namely, open space, pedestrian path, street circulation, and street furniture. The result shows that the four elements of landscape in Sipiso-Piso Waterfall is still not proper and needs improvement.

  18. Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-01-01

    This Quality Assurance Plan (QAP) is concerned with design and construction (Sect. 2) and characterization and monitoring (Sect. 3). The basis for Sect. 2 is the Quality Assurance Plan for the Design and Construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee, and the basis for Sect. 3 is the Environmental Restoration Quality Program Plan. Combining the two areas into one plan gives a single, overall document that explains the requirements and from which the individual QAPs and quality assurance project plans can be written. The Waste Area Grouping (WAG) 6 QAP establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 project. Quality Assurance (QA) activities are subject to requirements detailed in the Martin Marietta Energy Systems, Inc. (Energy Systems), QA Program and the Environmental Restoration (ER) QA Program, as well as to other quality requirements. These activities may be performed by Energy Systems organizations, subcontractors to Energy Systems, and architect-engineer (A-E) under prime contract to the US Department of Energy (DOE), or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems quality requirements for the project. The WAG 6 QAP will be supplemented by subproject QAPs that will identify additional requirements pertaining to each subproject

  19. Contingency Analysis Post-Processing With Advanced Computing and Visualization

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yousu; Glaesemann, Kurt; Fitzhenry, Erin

    2017-07-01

    Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability and accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.

  20. Field assessment of a model tuberculosis outbreak response plan for low-incidence areas

    Directory of Open Access Journals (Sweden)

    Pascopella Lisa

    2007-10-01

    Full Text Available Abstract Background For a regional project in four low-incidence states, we designed a customizable tuberculosis outbreak response plan. Prior to dissemination of the plan, a tuberculosis outbreak occurred, presenting an opportunity to perform a field assessment of the plan. The purpose of the assessment was to ensure that the plan included essential elements to help public health professionals recognize and respond to outbreaks. Methods We designed a semi-structured questionnaire and interviewed all key stakeholders involved in the response. We used common themes to assess validity of and identify gaps in the plan. A subset of participants provided structured feedback on the plan. Results We interviewed 11 public health and six community stakeholders. The assessment demonstrated that (1 almost all of the main response activities were reflected in the plan; (2 the plan added value by providing a definition of a tuberculosis outbreak and guidelines for communication and evaluation. These were areas that lacked written protocols during the actual outbreak response; and (3 basic education about tuberculosis and the interpretation and use of genotyping data were important needs. Stakeholders also suggested adding to the plan questions for evaluation and a section for specific steps to take when an outbreak is suspected. Conclusion An interactive field assessment of a programmatic tool revealed the value of a systematic outbreak response plan with a standard definition of a tuberculosis outbreak, guidelines for communication and evaluation, and response steps. The assessment highlighted the importance of education and training for tuberculosis in low-incidence areas.

  1. Comparison of accuracy in predicting emotional instability from MMPI data: fisherian versus contingent probability statistics

    Energy Technology Data Exchange (ETDEWEB)

    Berghausen, P.E. Jr.; Mathews, T.W.

    1987-01-01

    The security plans of nuclear power plants generally require that all personnel who are to have access to protected areas or vital islands be screened for emotional stability. In virtually all instances, the screening involves the administration of one or more psychological tests, usually including the Minnesota Multiphasic Personality Inventory (MMPI). At some plants, all employees receive a structured clinical interview after they have taken the MMPI and results have been obtained. At other plants, only those employees with dirty MMPI are interviewed. This latter protocol is referred to as interviews by exception. Behaviordyne Psychological Corp. has succeeded in removing some of the uncertainty associated with interview-by-exception protocols by developing an empirically based, predictive equation. This equation permits utility companies to make informed choices regarding the risks they are assuming. A conceptual problem exists with the predictive equation, however. Like most predictive equations currently in use, it is based on Fisherian statistics, involving least-squares analyses. Consequently, Behaviordyne Psychological Corp., in conjunction with T.W. Mathews and Associates, has just developed a second predictive equation, one based on contingent probability statistics. The particular technique used in the multi-contingent analysis of probability systems (MAPS) approach. The present paper presents a comparison of predictive accuracy of the two equations: the one derived using Fisherian techniques versus the one thing contingent probability techniques.

  2. Comparison of accuracy in predicting emotional instability from MMPI data: fisherian versus contingent probability statistics

    International Nuclear Information System (INIS)

    Berghausen, P.E. Jr.; Mathews, T.W.

    1987-01-01

    The security plans of nuclear power plants generally require that all personnel who are to have access to protected areas or vital islands be screened for emotional stability. In virtually all instances, the screening involves the administration of one or more psychological tests, usually including the Minnesota Multiphasic Personality Inventory (MMPI). At some plants, all employees receive a structured clinical interview after they have taken the MMPI and results have been obtained. At other plants, only those employees with dirty MMPI are interviewed. This latter protocol is referred to as interviews by exception. Behaviordyne Psychological Corp. has succeeded in removing some of the uncertainty associated with interview-by-exception protocols by developing an empirically based, predictive equation. This equation permits utility companies to make informed choices regarding the risks they are assuming. A conceptual problem exists with the predictive equation, however. Like most predictive equations currently in use, it is based on Fisherian statistics, involving least-squares analyses. Consequently, Behaviordyne Psychological Corp., in conjunction with T.W. Mathews and Associates, has just developed a second predictive equation, one based on contingent probability statistics. The particular technique used in the multi-contingent analysis of probability systems (MAPS) approach. The present paper presents a comparison of predictive accuracy of the two equations: the one derived using Fisherian techniques versus the one thing contingent probability techniques

  3. Resource estimations in contingency planning for FMD

    DEFF Research Database (Denmark)

    Boklund, Anette; Sten, Mortensen; Holm Johansen, Maren

    Based on results from a stochastic simulation model, it was possible to create a simple model in excel to estimate the requirements for personnel and materiel during an FMD outbreak in Denmark. The model can easily be adjusted, when new information on resources appears from management of other cr...

  4. Continuity and Contingency in USAF Posture Planning

    Science.gov (United States)

    2016-01-01

    2007, and Daniel Gardner, Future Babble: Why Pundits Are Hedgehogs and Foxes Know Best, New York: Plume, 2012. 32 or demands considered most...New York: Harper Collins, 1997; and Gabriel Kolko, Anatomy of a War: Vietnam, the United States and the Modern Historical Experience, New York: The...Getler, “ Anatomy of a Failed Mission,” Washington Post, April 27, 1980. 202 Bacevich, 2005, p. 105. 203 Bacevich, 2005, pp. 106–17. Reagan also used

  5. Strategic optimization model and area planning for oil spill response; Modelo de otimizacao estrategico e de planejamento de area para resposta a derramamentos de oleo

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Luiz Rodolfo Tinoco Aboim; Ferreira Filho, Virgilio Jose Martins [Universidade Federal do Rio de Janeiro (UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE). Programa de Engenharia de Producao

    2004-07-01

    This paper deals with strategic aspect of the oil spill response problem, that is, with the problem of deciding where to locate adequate capability to respond to potential oil spills. In addition to locational considerations, the strategic oil spill response problem generally calls for decisions concerning the proper levels and types of equipment to be stockpiled, as well as for policies regarding the allocation of such capability among points of high oil spill potential. The oil spill optimization models can contribute with contingency plans that are prepared by responsible parties . It is described one model that address current legal requirements, in particular, the time-phasing of response, and the use of this model as a decision support by responsible parties. (author)

  6. Corrective action investigation plan for CAU Number 453: Area 9 Landfill, Tonopah Test Range

    International Nuclear Information System (INIS)

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) contains the environmental sample collection objectives and criteria for conducting site investigation activities at the Area 9 Landfill, Corrective Action Unit (CAU) 453/Corrective Action (CAS) 09-55-001-0952, which is located at the Tonopah Test Range (TTR). The TTR, included in the Nellis Air Force Range, is approximately 255 kilometers (140 miles) northwest of Las Vegas, Nevada. The Area 9 Landfill is located northwest of Area 9 on the TTR. The landfill cells associated with CAU 453 were excavated to receive waste generated from the daily operations conducted at Area 9 and from range cleanup which occurred after test activities

  7. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-03-01

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is

  8. Recognition of management structure and spatial planning in Tehran metropolitan area

    Directory of Open Access Journals (Sweden)

    Manijeh Lalehpour

    2016-06-01

    Full Text Available Metropolitan areas are concentrated and dense areas filled settlements and include a central urban region with its surrounding residences. Severity and complexity of issues in metropolitan areas along with intricacy and quantity of influential factors in these areas necessitate novel approaches and innovative solutions for comprehensive strategies and management coordination of land use in these regions. The present study has taken this approach to investigate management structure and spatial planning in Tehran metropolitan area. The study takes parameters like political and management decentralization, elements affecting urban management based on the sources of power and province and finally spatial domain of urban management into account. Findings revealed that decentralization in national management and political structure has limited tasks and authority of urban management. In this regard, a closer look at management structure and spatial planning of Tehran metropolitan are demonstrates that the government and its element dominate policy making, planning and spatial management of the city and inherent position of municipality and city council suffer weaknesses in their role as urban management. Results from investigating official tasks in urban management elements and their spatial domain reveals lack of coordination and Fragmentation in management structure and spatial planning in the region. The paper attempts to discuss these Fragmentation in the fields of management, function, politics and domains.

  9. Tethered Satellite System Contingency Investigation Board

    Science.gov (United States)

    1992-11-01

    The Tethered Satellite System (TSS-1) was launched aboard the Space Shuttle Atlantis (STS-46) on July 31, 1992. During the attempted on-orbit operations, the Tethered Satellite System failed to deploy successfully beyond 256 meters. The satellite was retrieved successfully and was returned on August 6, 1992. The National Aeronautics and Space Administration (NASA) Associate Administrator for Space Flight formed the Tethered Satellite System (TSS-1) Contingency Investigation Board on August 12, 1992. The TSS-1 Contingency Investigation Board was asked to review the anomalies which occurred, to determine the probable cause, and to recommend corrective measures to prevent recurrence. The board was supported by the TSS Systems Working group as identified in MSFC-TSS-11-90, 'Tethered Satellite System (TSS) Contingency Plan'. The board identified five anomalies for investigation: initial failure to retract the U2 umbilical; initial failure to flyaway; unplanned tether deployment stop at 179 meters; unplanned tether deployment stop at 256 meters; and failure to move tether in either direction at 224 meters. Initial observations of the returned flight hardware revealed evidence of mechanical interference by a bolt with the level wind mechanism travel as well as a helical shaped wrap of tether which indicated that the tether had been unwound from the reel beyond the travel by the level wind mechanism. Examination of the detailed mission events from flight data and mission logs related to the initial failure to flyaway and the failure to move in either direction at 224 meters, together with known preflight concerns regarding slack tether, focused the assessment of these anomalies on the upper tether control mechanism. After the second meeting, the board requested the working group to complete and validate a detailed integrated mission sequence to focus the fault tree analysis on a stuck U2 umbilical, level wind mechanical interference, and slack tether in upper tether

  10. Field Sampling Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    International Nuclear Information System (INIS)

    Lewis, Michael George

    2016-01-01

    This field sampling plan describes sampling of the soil/liner of Lagoon 3 at the Central Facilities Area Sewage Treatment Plant. The lagoon is to be closed, and samples obtained from the soil/liner will provide information to determine if Lagoon 3 and the land application area can be closed in a manner that renders it safe to human health and the environment. Samples collected under this field sampling plan will be compared to Idaho National Laboratory background soil concentrations. If the concentrations of constituents of concern exceed the background level, they will be compared to Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals and Resource Conservation and Recovery Act levels. If the concentrations of constituents of concern are lower than the background levels, Resource Conservation and Recovery Act levels, or the preliminary remediation goals, then Lagoon 3 and the land application area will be closed. If the Resource Conservation and Recovery Act levels and/or the Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals are exceeded, additional sampling and action may be required.

  11. Field Sampling Plan for Closure of the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Michael George [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-10-01

    This field sampling plan describes sampling of the soil/liner of Lagoon 3 at the Central Facilities Area Sewage Treatment Plant. The lagoon is to be closed, and samples obtained from the soil/liner will provide information to determine if Lagoon 3 and the land application area can be closed in a manner that renders it safe to human health and the environment. Samples collected under this field sampling plan will be compared to Idaho National Laboratory background soil concentrations. If the concentrations of constituents of concern exceed the background level, they will be compared to Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals and Resource Conservation and Recovery Act levels. If the concentrations of constituents of concern are lower than the background levels, Resource Conservation and Recovery Act levels, or the preliminary remediation goals, then Lagoon 3 and the land application area will be closed. If the Resource Conservation and Recovery Act levels and/or the Comprehensive Environmental Response, Compensation, and Liability Act preliminary remediation goals are exceeded, additional sampling and action may be required.

  12. 78 FR 46598 - Notice of Availability of the Draft Rob Jaggers Camping Area Business Plan and Expanded Amenity...

    Science.gov (United States)

    2013-08-01

    ... Availability of the Draft Rob Jaggers Camping Area Business Plan and Expanded Amenity Fee Schedule for the Fort... the Draft Rob Jaggers Camping Area Business Plan and Expanded Amenity Fee Schedule. The Rob Jaggers... comments will be considered, the BLM must receive written comments on the Draft Business Plan by December...

  13. 78 FR 40764 - Notice of Intent To Amend the California Desert Conservation Area Plan for the Needles Field...

    Science.gov (United States)

    2013-07-08

    ... for sale in the 1980 CDCA Plan, as amended, and a plan amendment is required to process a direct sale... anticipates that the EA will consider both a plan amendment and possible subsequent sales of the Federal...] Notice of Intent To Amend the California Desert Conservation Area Plan for the Needles Field Office and...

  14. 78 FR 4868 - Notice of Intent To Amend the California Desert Conservation Area Plan and Prepare an Associated...

    Science.gov (United States)

    2013-01-23

    ... specifically identified for sale in the CDCA Plan, as amended, and a plan amendment is therefore required to.... The BLM anticipates that the EA will consider both a plan amendment and the subsequent sale of the...] Notice of Intent To Amend the California Desert Conservation Area Plan and Prepare an Associated...

  15. 77 FR 60718 - Notice of Intent To Prepare an Amendment to the California Desert Conservation Area Plan and...

    Science.gov (United States)

    2012-10-04

    ... above is currently not available for sale under the 1980 CDCA Plan as amended, and a plan amendment is required to process a direct sale. This plan amendment will be limited to an analysis of whether the public...; CACA-53705] Notice of Intent To Prepare an Amendment to the California Desert Conservation Area Plan...

  16. Louisiana Speaks Regional Plan Vision New Growth Areas, UTM Zone 15N NAD83, Louisiana Recovery Authority (2007), [louisiana_speaks_vision_new_growth_areas

    Data.gov (United States)

    Louisiana Geographic Information Center — This GIS shapefile data illustrates new growth areas included in the Louisiana Speaks Regional Plan Vision. New growth areas include a mix of industrial, single...

  17. Louisiana Speaks Regional Plan Vision New Town Center Growth Areas, UTM Zone 15N NAD83, Louisiana Recovery Authority (2007), [louisiana_speaks_vision_new_town_growth_areas

    Data.gov (United States)

    Louisiana Geographic Information Center — This GIS shapefile data illustrates town center new growth areas included in the Louisiana Speaks Regional Plan Vision. Town center new growth areas include local...

  18. Closure plan for the M-Area settling basin and vicinity at the Savannah River Plant

    International Nuclear Information System (INIS)

    Colven, W.P.; Pickett, J.B.

    1985-07-01

    The areas addressed in this closure plan include a process sewer line, surface impoundment (settling basin), overflow ditch, seepage area, and a Carolina Bay known as Lost Lake. Since it is proposed that the basin and vicinity be closed with the hazardous wastes placed and stabilized in the basin, it will be closed pursuant to regulations for closing a hazardous waste landfill. No free liquids will remain in the impoundment after closure is completed

  19. Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4

    International Nuclear Information System (INIS)

    A. M. Tyson

    2006-01-01

    This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project

  20. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  1. Family planning among women in urban and rural areas in Serbia

    Directory of Open Access Journals (Sweden)

    Antić Ljiljana

    2013-01-01

    Full Text Available Introduction. Family planning is an important aspect of population policy at the state level, because the demographic trends in Serbia are very unfavorable. Objective. The objective of this study was to examine the differences in family planning between the women in rural and urban areas of Serbia. Methods. This study represents the secondary analysis of the National Health Survey of the population in Serbia from 2006, which was conducted as a cross sectional study, on a representative sample of the population. Results. The respondents who used condoms as a method of contraception, were often younger, better educated, had better financial status, lived in Vojvodina, and had no children. Conclusion. Our study showed that there were differences in terms of family planning between the women of urban and rural areas, however, these differences could be explained by differences in age and education. [Projekat Ministarstva nauke Republike Srbije, br. 175025: National Health Survey of the Population of Serbia

  2. An Investigation of Southwestern Area Principals and the Enactment of Crisis Plans in High Schools

    Science.gov (United States)

    Parker, Kerry L.

    2012-01-01

    The purpose of this study was to identify what southwestern area high school principals reported as the enactment of school crisis plans as described in the Center for Mental Health in Schools at UCLA (CMHS, 2008), "Resource Aid: Responding to a Crisis at School." The conceptual framework guiding the study was an adaptation of the Crisis…

  3. Designing a strategic plan development approach for integrated area development projects

    NARCIS (Netherlands)

    de Kort, Inge

    2009-01-01

    Increasingly, it has become evident that spatial problems can no longer be resolved in isolation, but should be solved in conjunction with other development-related issues. Interest in integrated area development is growing, and a more integrated planning approach is desired. In this design-based

  4. 78 FR 72036 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Science.gov (United States)

    2013-12-02

    ... maintenance plan to the year 2025 and updating the sub-area motor vehicle emission budgets (MVEBs) for... taking? III. Why is EPA taking these actions? IV. What are the effects of these actions? V. Final Action... design values Location County Monitor ID 2008 2009 2010 2008-2010 Lincoln County Replacing Iron Station...

  5. 78 FR 45152 - Approval and Promulgation of Implementation Plans and Designation of Areas; North Carolina...

    Science.gov (United States)

    2013-07-26

    ... North Carolina SIP meets the requirements of section 182(b)(5) applicable for purposes of redesignation...] Approval and Promulgation of Implementation Plans and Designation of Areas; North Carolina; Redesignation... supplemented on March 28, 2013, the State of North Carolina, through the North Carolina Department of...

  6. 75 FR 47619 - Notice of Availability of the Proposed California Desert Conservation Area Plan Amendment and...

    Science.gov (United States)

    2010-08-06

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-48668, 49502, 49503, 49504, LLCAD09000.L51010000.FX0000, LVRWB09B2400] Notice of Availability of the Proposed California Desert Conservation Area Plan Amendment and Final Environmental Impact Statement for the Ivanpah Solar Electric Generating...

  7. 200 West Area Ash Pit Demolition Site closure plan. Revision 1

    International Nuclear Information System (INIS)

    Ruck, F.R.

    1994-01-01

    The Ash Pit Demolition Site had two known demolition events, the first occurred in November of 1984, and the second occurred in June of 1986. These demolition events were a form of thermal treatment for discarded explosive chemical products. Because the Ash Pit Demolition Site will no longer be used for this thermal activity, the site will be closed. Closure will be conducted pursuant to the requirements of the Washington State Department of Ecology (Ecology) ''Dangerous Waste Regulations'', Washington Administrative Code (WAC) 173-303-610 and 40 Code of Federal Regulations (CFR) 270.1. The 200 West Area Ash Pit Demolition Site Closure Plan consists of a Part A, Form 3, Dangerous Waste Permit Application (Revision 4) and a closure plan. An explanation of the Part A, Form 3, submitted with this closure plan is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and five appendices. This closure plan presents a description of the Ash,Pit Demolition Site, the history of the waste treated, and the approach that will be followed to close the Ash Pit Demolition Site. Because there were no radioactively contaminated chemicals involved in the demolitions, the information on radionuclides is provided for ''information only''. Remediation of any radioactive contamination is not within the scope of this closure plan. Only dangerous constituents derived from Ash Pit Demolition Site operations will be addressed in this closure plan in accordance with WAC 173-303-610(2)(b)(i)

  8. Interim Corrective Measures Work Plan for the Expanded Bioventing System Eglin Main Base Old Fire Training Area

    National Research Council Canada - National Science Library

    1997-01-01

    This interim corrective measures work plan (ICM work plan) presents the scope for an expanded bioventing system for in situ treatment of fuel-contaminated soils at the Eglin Main Base Old Fire Training Area (old Eglin FTA...

  9. Concept and Planning of Site Preparation for Radioactive Waste Disposal in Jawa and Surrounding Area

    International Nuclear Information System (INIS)

    Heru Sriwahyuni; Sastrowardoyo, Pratomo B.; Teddy Sumantri; Dewi Susilowati; Hendra Adhi Pratama; Syarmufni, A.

    2008-01-01

    Concept and planning for radioactive waste disposal in Jawa and surrounding area have been done. These activities were part of the investigation for preparation of repository location in Jawa. In this report, the summary of previous sitting activities, the waste inventory in Radioactive Waste Technology Centre, and list of important factors for sitting on radioactive waste disposal location. Several potential areas such as Karawang, Subang, Majalengka, Rembang, Tuban, Madura will be the focus for next activities. The result will be part of activities report regarding the preparation of repository location in Jawa and surrounding area, that will be used as recommendation prior to radioactive waste management policy. (author)

  10. Land use-based landscape planning and restoration in mine closure areas.

    Science.gov (United States)

    Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke

    2011-05-01

    Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.

  11. Land Use-Based Landscape Planning and Restoration in Mine Closure Areas

    Science.gov (United States)

    Zhang, Jianjun; Fu, Meichen; Hassani, Ferri P.; Zeng, Hui; Geng, Yuhuan; Bai, Zhongke

    2011-05-01

    Landscape planning and restoration in mine closure areas is not only an inevitable choice to sustain mining areas but also an important path to maximize landscape resources and to improve ecological function in mine closure areas. The analysis of the present mine development shows that many mines are unavoidably facing closures in China. This paper analyzes the periodic impact of mining activities on landscapes and then proposes planning concepts and principles. According to the landscape characteristics in mine closure areas, this paper classifies available landscape resources in mine closure areas into the landscape for restoration, for limited restoration and for protection, and then summarizes directions for their uses. This paper establishes the framework of spatial control planning and design of landscape elements from "macro control, medium allocation and micro optimization" for the purpose of managing and using this kind of special landscape resources. Finally, this paper applies the theories and methods to a case study in Wu'an from two aspects: the construction of a sustainable land-use pattern on a large scale and the optimized allocation of typical mine landscape resources on a small scale.

  12. 300 Area Integrated Field-Scale Subsurface Research Challenge (IFRC) Field Site Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Freshley, Mark D.

    2008-12-31

    Pacific Northwest National Laboratory (PNNL) has established the 300 Area Integrated Field-Scale Subsurface Research Challenge (300 Area IFRC) on the Hanford Site in southeastern Washington State for the U.S. Department of Energy’s (DOE) Office of Biological and Environmental Research (BER) within the Office of Science. The project is funded by the Environmental Remediation Sciences Division (ERSD). The purpose of the project is to conduct research at the 300 IFRC to investigate multi-scale mass transfer processes associated with a subsurface uranium plume impacting both the vadose zone and groundwater. The management approach for the 300 Area IFRC requires that a Field Site Management Plan be developed. This is an update of the plan to reflect the installation of the well network and other changes.

  13. Navigated transcranial magnetic stimulation in preoperative planning for the treatment of motor area cavernous angiomas

    Science.gov (United States)

    Paiva, Wellingson Silva; Fonoff, Erich Talamoni; Marcolin, Marco Antonio; Bor-Seng-Shu, Edson; Figueiredo, Eberval Gadelha; Teixeira, Manoel Jacobsen

    2013-01-01

    Since the introduction of microscopic techniques, radical surgery for cavernous angiomas has become a recommended treatment option. However, the treatment of motor area cavernous angioma represents a great challenge for the surgical team. Here, we describe an approach guided by frameless neuronavigation and preoperative functional mapping with transcranial magnetic stimulation (TMS), for surgical planning. We used TMS to map the motor cortex and its relationship with the angioma. We achieved complete resection of the lesions in the surgeries, while avoiding areas of motor response identified during the preoperative mapping. We verified the complete control of seizures (Engel class 1A) in the patients with previous refractory epilepsy. Postsurgery, one patient was seizure-free without medication, and two patients required only one medication for seizure control. Thus, navigated TMS appears to be a useful tool, in preoperative planning for cavernous angiomas of the motor area. PMID:24353424

  14. Reimaanlok: A National Framework for Conservation Area Planning in the Marshall Islands

    Directory of Open Access Journals (Sweden)

    Nicole Baker

    2011-01-01

    Full Text Available The development of Reimaanlok, a national framework for the planning and establishment of community-based conservation areas in the Marshall Islands, is outlined. A team composed of international experts and local resource management professionals selected and modified an ecoregional planning approach, defined key concepts, selected conservation features and targets, compiled biogeographical information from scientific and local knowledge and carried out a national-level ecological gap assessment. Past development of community-based fisheries and conservation plans was reviewed and the lessons learned informed the development of a robust community-based planning process for the design and establishment of conservation areas on individual atolls, integrating ecosystem based management (EBM theory, traditional knowledge and management, and the particular socio-economic needs of island communities. While specific geographic, historical, cultural and economic characteristics of the Marshall Islands have created a framework that is unique, several aspects of this process offer ideas for national strategic conservation planning in other Small Island Developing States where there is a paucity of scientific data, significant and increasing threats, and where decision-making about the use of natural resources occurs primarily at the local level.

  15. Inevitability, contingency, and epistemic humility.

    Science.gov (United States)

    Kidd, Ian James

    2016-02-01

    This paper offers an epistemological framework for the debate about whether the results of scientific enquiry are inevitable or contingent. I argue in Sections 2 and 3 that inevitabilist stances are doubly guilty of epistemic hubris--a lack of epistemic humility--and that the real question concerns the scope and strength of our contingentism. The latter stages of the paper-Sections 4 and 5-address some epistemological and historiographical worries and sketch some examples of deep contingencies to guide further debate. I conclude by affirming that the concept of epistemic humility can usefully inform critical reflection on the contingency of the sciences and the practice of history of science. Copyright © 2015 Elsevier Ltd. All rights reserved.

  16. Waste analysis plan for the 200 area effluent treatment facility and liquid effluent retention facility

    International Nuclear Information System (INIS)

    Ballantyne, N.A.

    1995-01-01

    This waste analysis plan (WAP) has been prepared for startup of the 200 Area Effluent Treatment Facility (ETF) and operation of the Liquid Effluent Retention Facility (LERF), which are located on the Hanford Facility, Richland, Washington. This WAP documents the methods used to obtain and analyze representative samples of dangerous waste managed in these units, and of the nondangerous treated effluent that is discharged to the State-Approved Land Disposal System (SALDS). Groundwater Monitoring at the SALDS will be addressed in a separate plan

  17. Proposed plan for the K-Area Bingham Pump Outage Pit (643-1G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1997-06-01

    This Proposed Plan is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this Proposed Plan is to describe the preferred remedial alternative for addressing the K-Area Bingham Pump Outage Pit (643-1G) (K BPOP) located at the Savannah River Site (SRS) in Aiken, South Carolina and to solicit public comments on the preferred alternative

  18. Contingent Employment in the Netherlands

    OpenAIRE

    Pot, F.; Koene, Bas; Paauwe, Jaap

    2001-01-01

    textabstractIn the last decade the Dutch labour market has demonstrated an admirable capacity to generate jobs. Consequently, the unemployment rate has significantly decreased. However, the newly generated jobs are a-typical in the sense that they are not full-time jobs based on open-ended contracts. Instead, the job growth has relied on the growth of part-time and contingent jobs. While the creation of part-time jobs seems to be employee-driven, contingent employment, in contrast, seems to b...

  19. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    Energy Technology Data Exchange (ETDEWEB)

    Childs, Allen B.

    2002-02-01

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public

  20. Spatial planning for a green economy: National-level hydrologic ecosystem services priority areas for Gabon.

    Science.gov (United States)

    Goldstein, Joshua Howard; Tallis, Heather; Cole, Aaron; Schill, Steven; Martin, Erik; Heiner, Michael; Paiz, Marie-Claire; Aldous, Allison; Apse, Colin; Nickel, Barry

    2017-01-01

    Rapidly developing countries contain both the bulk of intact natural areas and biodiversity, and the greatest untapped natural resource stocks, placing them at the forefront of "green" economic development opportunities. However, most lack scientific tools to create development plans that account for biodiversity and ecosystem services, diminishing the real potential to be sustainable. Existing methods focus on biodiversity and carbon priority areas across large geographies (e.g., countries, states/provinces), leaving out essential services associated with water supplies, among others. These hydrologic ecosystem services (HES) are especially absent from methods applied at large geographies and in data-limited contexts. Here, we present a novel, spatially explicit, and relatively simple methodology to identify countrywide HES priority areas. We applied our methodology to the Gabonese Republic, a country undergoing a major economic transformation under a governmental commitment to balance conservation and development goals. We present the first national-scale maps of HES priority areas across Gabon for erosion control, nutrient retention, and groundwater recharge. Priority sub-watersheds covered 44% of the country's extent. Only 3% of the country was identified as a priority area for all HES simultaneously, highlighting the need to conserve different areas for each different hydrologic service. While spatial tradeoffs occur amongst HES, we identified synergies with two other conservation values, given that 66% of HES priority areas intersect regions of above average area-weighted (by sub-watersheds) total forest carbon stocks and 38% intersect with terrestrial national parks. Considering implications for development, we identified HES priority areas overlapping current or proposed major roads, forestry concessions, and active mining concessions, highlighting the need for proactive planning for avoidance areas and compensatory offsets to mitigate potential conflicts

  1. Spatial planning for a green economy: National-level hydrologic ecosystem services priority areas for Gabon.

    Directory of Open Access Journals (Sweden)

    Joshua Howard Goldstein

    Full Text Available Rapidly developing countries contain both the bulk of intact natural areas and biodiversity, and the greatest untapped natural resource stocks, placing them at the forefront of "green" economic development opportunities. However, most lack scientific tools to create development plans that account for biodiversity and ecosystem services, diminishing the real potential to be sustainable. Existing methods focus on biodiversity and carbon priority areas across large geographies (e.g., countries, states/provinces, leaving out essential services associated with water supplies, among others. These hydrologic ecosystem services (HES are especially absent from methods applied at large geographies and in data-limited contexts. Here, we present a novel, spatially explicit, and relatively simple methodology to identify countrywide HES priority areas. We applied our methodology to the Gabonese Republic, a country undergoing a major economic transformation under a governmental commitment to balance conservation and development goals. We present the first national-scale maps of HES priority areas across Gabon for erosion control, nutrient retention, and groundwater recharge. Priority sub-watersheds covered 44% of the country's extent. Only 3% of the country was identified as a priority area for all HES simultaneously, highlighting the need to conserve different areas for each different hydrologic service. While spatial tradeoffs occur amongst HES, we identified synergies with two other conservation values, given that 66% of HES priority areas intersect regions of above average area-weighted (by sub-watersheds total forest carbon stocks and 38% intersect with terrestrial national parks. Considering implications for development, we identified HES priority areas overlapping current or proposed major roads, forestry concessions, and active mining concessions, highlighting the need for proactive planning for avoidance areas and compensatory offsets to mitigate

  2. 75 FR 60680 - Designation of Areas for Air Quality Planning Purposes; State of Arizona; Pinal County; PM10

    Science.gov (United States)

    2010-10-01

    ... the Apache Junction area within Pinal County; and the Hayden/Miami planning area, which includes the... the Hayden/ Miami PM 10 nonattainment area into two separate PM 10 nonattainment areas. See 72 FR... Apache Reservation lies in the existing Hayden PM 10 nonattainment area. The rest of the Pinal County...

  3. Transuranic Storage Area (TSA)-2 container storage unit RCRA closure plan

    International Nuclear Information System (INIS)

    Lodman, D.W.; Spry, M.J.; Nolte, E.P.; Barry, G.A.

    1992-11-01

    This document describes the proposed plans for closure of the Transuranic Storage Area (TSA)-2 container storage unit at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. The location, size, capacity, history, and current status of the unit are described. Future plans for the unit include incorporating the earthen-covered portion of the TSA-2 pad into a TSA retrieval enclosure along with the TSA-1 and TSAR pads, and closure of the portion of the TSA-2 pad under the Air Support Weather Shield (ASWS-2). This plan addresses closure of the ASWS-2 by decontaminating structures and equipment that may have contacted the waste. Sufficient sampling and documentation of all closure activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  4. Emerging practices of wind farm planning in a dense bird migration area

    DEFF Research Database (Denmark)

    Clausen, Niels-Erik; Mortensen, N.G.; Hansen, J.C.

    2003-01-01

    The objective of this paper is to present part of The Wind Atlas for Egypt project aiming at developing a firm basis for planning and utilization of the vast wind energy resources available in Egypt. The project should recommend a common planning framework for wind farm development in Egypt...... is briefly introduced. As a case study to illustrate the planning process a 60 MW wind farm located at the Gulf of El-Zayt at the Gulf of Suez in Egypt will be analysed. This area is chosen for its very high wind energy potential and the high concentration of migrating birds during spring and autumn. During...... the site selection and layout of a wind farm the balancing of interests and land use will be described....

  5. Closure plan for the M-Area settling basin and vicinity at the Savannah River Plant

    International Nuclear Information System (INIS)

    Colven, W.P.; Pickett, J.B.; Muska, C.F.; Boone, L.F.

    1988-03-01

    The closure plan for the M-Area settling basin and vicinity was originally submitted to the South Carolina Department of Health and Environmental Control (SCDHEC) Bureau of Solid and Hazardous Waste Management in September 1984. The plan was revised in July and November 1985 in response to SCDHEC comments. After public comment in April through July 1986, the closure plan was conditionally approved by SCDHEC in March 1987. The conditions included (1) providing a temporary wastewater treatment facility to process the water remaining in the basin, (2) using a burn box to limit ash emissions from burning in the basin, (3) obtaining SCDHEC approval prior to operating the leach field, and (4) completing all closure activities within three years of the startup date

  6. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  7. Contingency Theories of Leadership: A Study.

    Science.gov (United States)

    Saha, Sunhir K.

    1979-01-01

    Some of the major contingency theories of leadership are reviewed; some results from the author's study of Fiedler's contingency model are reported; and some thoughts for the future of leadership research are provided. (Author/MLF)

  8. 78 FR 1149 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Science.gov (United States)

    2013-01-08

    ... pollution control regulations and other permanent and enforceable regulations. Based on our review of the... would, therefore, be adequate to ensure prompt correction of a violation and comply with the contingency...)(2)). List of Subjects 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation...

  9. Tanjung Enim IV coal exploration project. Volume III. Preliminary mining plan for South Arahan area

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Based on the results of the survey carried out at Tanjung Enim in South Sumatra, a mining plan in the South Arahan area was studied. The plan was studied with geological structure, coal quality and social basement facilities as restriction conditions, with the mining amount, selling price and land transportation expenses as fluctuation factors, and using the optimum mining area determination method (pit optimizer), etc. The results of the survey were classified into the following 11 items: 1) assumptions; 2) pit optimization; 3) pit design; 4) long term scheduling; 5) detailed scheduling; 6) waste dumping; 7) mining equipment model case simulation; 8) mine facilities; 9) mine economics; 10) investigation of coal transportation; 11) conclusion. In 1), study was made on geological modeling, coal quality data and mining economics. (NEDO)

  10. Consideration of Environmental Factors in Planning and Development of Urban Areas

    Science.gov (United States)

    Kustysheva, I.

    2017-11-01

    Environmental factors, in varying degrees, always have a direct influence on the urban environment formation and the provision of favorable and safe conditions for the life of the population. Their role in the planning and development of urban areas remains an integral part of the management of such areas. Management should be aimed at improving the efficiency of use of the territories and ecological environment improvement. Planning must be done with the consideration of identified ecological processes in cities on the basis of the information about their occurrence in the past and present. Currently, cities face a multitude of problems that require urgent and immediate solutions. One of the most important issues is the poor state of the urban environment, so the environmental factors remain one of the most critical problems that should be considered by the authorities while implementing the urban areas’ development plans. The article discusses the role of environmental factors in the management and planning of urban territories by the example of the city of Tobolsk.

  11. Louisiana Speaks Regional Plan Community Growth Options: Vacant, Developed, and Constrained Areas; UTM 15N NAD83; LRA (2007); [developable

    Data.gov (United States)

    Louisiana Geographic Information Center — This GIS raster data set illustrates vacant, developed, and constrained areas for the 35 parishes in the Louisiana Speaks Regional Plan South Louisiana study area....

  12. Breakdown concepts for contingency tables

    NARCIS (Netherlands)

    Kuhnt, S.

    2010-01-01

    Loglinear Poisson models are commonly used to analyse contingency tables. So far, robustness of parameter estimators as well as outlier detection have rarely been treated in this context. We start with finite-sample breakdown points. We yield that the breakdown point of mean value estimators

  13. Lessons in Contingent, Recursive Humility

    Science.gov (United States)

    Vagle, Mark D.

    2011-01-01

    In this article, the author argues that critical work in teacher education should begin with teacher educators turning a critical eye on their own practices. The author uses Lesko's conception of contingent, recursive growth and change to analyze a lesson he observed as part of a phenomenological study aimed at understanding more about what it is…

  14. Job satisfaction and contingent employment

    NARCIS (Netherlands)

    de Graaf-Zijl, M.

    2012-01-01

    This paper analyses job satisfaction as an aggregate of satisfaction with several job aspects, with special focus on the influence of contingent-employment contracts. Fixed-effect analysis is applied on a longitudinal sample of Dutch employees in four work arrangements: regular, fixed-term, on-call

  15. A Profile of Contingent Workers.

    Science.gov (United States)

    Polivka, Anne E.

    1996-01-01

    Based on data from the supplement to the February 1995 Current Population Survey, contingent workers were more likely to be female, black, young, enrolled in school, and employed in services and construction industries than were noncontingent workers. More than 10% were teachers. (Author)

  16. How Precarious Is Contingent Work?

    DEFF Research Database (Denmark)

    Scheuer, Steen

    2015-01-01

    agree. This study focuses on a number of non-pay conditions for contingent employees, compared to permanent staff, under the assumption that these conditions are cumulatively negative. The article is based on utilizes a survey of app.4,900 employees (response rate 57%), asking questions concerning...

  17. National Laboratory Planning: Developing Sustainable Biocontainment Laboratories in Limited Resource Areas

    OpenAIRE

    Yeh, Kenneth B.; Adams, Martin; Stamper, Paul D.; Dasgupta, Debanjana; Hewson, Roger; Buck, Charles D.; Richards, Allen L.; Hay, John

    2016-01-01

    Strategic laboratory planning in limited resource areas is essential for addressing global health security issues. Establishing a national reference laboratory, especially one with BSL-3 or -4 biocontainment facilities, requires a heavy investment of resources, a multisectoral approach, and commitments from multiple stakeholders. We make the case for donor organizations and recipient partners to develop a comprehensive laboratory operations roadmap that addresses factors such as mission and r...

  18. Project Work Plan: Hanford 100-D Area Treatability Demonstration - In Situ Biostimulation for Reducing Barrier

    Energy Technology Data Exchange (ETDEWEB)

    Fruchter, Jonathan S.; Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.

    2006-05-31

    This work plan supports a new, integrated approach to accelerate cleanup of chromium in the Hanford 100 Areas. This new approach will provide supplemental treatment upgradient of the ISRM barrier by directly treating chromium and other oxidizing species in groundwater (i.e., nitrate and dissolved oxygen), thereby increasing the longevity of the ISRM barrier and protecting the ecological receptors and human health at the river boundary.

  19. 300 Area dangerous waste tank management system: Compliance plan approach. Final report

    International Nuclear Information System (INIS)

    1996-03-01

    In its Dec. 5, 1989 letter to DOE-Richland (DOE-RL) Operations, the Washington State Dept. of Ecology requested that DOE-RL prepare ''a plant evaluating alternatives for storage and/or treatment of hazardous waste in the 300 Area...''. This document, prepared in response to that letter, presents the proposed approach to compliance of the 300 Area with the federal Resource Conservation and Recovery Act and Washington State's Chapter 173-303 WAC, Dangerous Waste Regulations. It also contains 10 appendices which were developed as bases for preparing the compliance plan approach. It refers to the Radioactive Liquid Waste System facilities and to the radioactive mixed waste

  20. Program plan for the development of Solid Waste Storage Area 7 at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Lomenick, T.F.; Gonzales, S.; Byerly, D.W.

    1984-02-01

    The need for additional waste-burial facilities for low-level radwastes generated at Oak Ridge National Laboratory mandates development of a program to identify and evaluate an acceptable new Solid Waste Storage Area (SWSA 7). Provisions of this program include plans for identifying and evaluating SWSA 7 as well as plans for the necessary technical efforts for designing and monitoring a waste-burial facility. The development of the program plan is in accordance with general procedures issued by ORNL, and if adhered to, should meet proposed criteria and guidelines issued by such organizations as the Nuclear Regulatory Commission, the Environmental Protection Agency, the Department of Energy, and the Tennessee Department of Health. The major parts of the program include plans for (1) the acquisition of data necessary for geotechnical evaluation of a site, (2) the engineering design and construction of a facility which would be compatible with the geology and the classification and particular character of the wastes to be disposed, and (3) a monitoring system for achieving health and safety standards and environmental protection. The objective of the program, to develop SWSA 7, can only be achieved through sound management. Plans provided in this program which will ensure successful management include quality assurance, corrective measures, safety analysis, environmental impact statements, and schedule and budget

  1. Partners in flight bird conservation plan for the Upper Great Lakes Plain (Physiographic Area 16)

    Science.gov (United States)

    Knutson, M.G.; Butcher, G.; Fitzgerald, J.; Shieldcastle, J.

    2001-01-01

    1 November 2001. Conservation of bird habitats is a major focus of effort by Partners in Flight, an international coalition of agencies, citizens, and other groups dedicated to 'keeping common birds common'. USGS worked on a planning team to publish a bird conservation plan for the Upper Great Lakes Plain ecoregion (PIF 16), which includes large portions of southern Wisconsin, southern Michigan and parts of Minnesota, Iowa, Illinois, Indiana, and Ohio. The conservation plan outlines specific habitat restoration and bird population objectives for the ecoregion over the next decade. The plan provides a context for on-the-ground conservation implementation by the US Fish and Wildlife Service, the USDA Natural Resources Conservation Service, the US Forest Service, states, and conservation groups. Citation: Knutson, M. G., G. Butcher, J. Fitzgerald, and J. Shieldcastle. 2001. Partners in Flight Bird Conservation Plan for The Upper Great Lakes Plain (Physiographic Area 16). USGS Upper Midwest Environmental Sciences Center in cooperation with Partners in Flight, La Crosse, Wisconsin. Download from website: http://www.blm.gov/wildlife/pifplans.htm. The Upper Great Lakes Plain covers the southern half of Michigan, northwest Ohio, northern Indiana, northern Illinois, southern Wisconsin, and small portions of southwest Minnesota and northwest Iowa. Glacial moraines and dissected plateaus are characteristic of the topography. Broadleaf forests, oak savannahs, and a variety of prairie communities are the natural vegetation types. A oDriftless Areao was not glaciated during the late Pleistocene and emerged as a unique area of great biological diversity. Priority bird species for the area include the Henslow's Sparrow, Sedge Wren, Bobolink, Golden-winged Warbler, Cerulean Warbler, Black-billed Cuckoo, and Red-headed Woodpecker. There are many large urban centers in this area whose growth and sprawl will continue to consume land. The vast majority of the presettlement forest and

  2. 48 CFR 18.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contingency operation. 18... METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 18.201 Contingency operation. (a) Contingency operation is defined in 2.101. (b) Micro-purchase threshold. The threshold...

  3. 48 CFR 218.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contingency operation. 218... Flexibilities 218.201 Contingency operation. (1) Selection, appointment, and termination of appointment... in a contingency contracting force. See 201.603-2(2). (2) Policy for unique item identification...

  4. New Approach for forest inventory estimation and timber harvesting planning in mountain areas: the SLOPE project

    Science.gov (United States)

    Prandi, F.; Magliocchetti, D.; Poveda, A.; De Amicis, R.; Andreolli, M.; Devigili, F.

    2016-06-01

    Forests represent an important economic resource for mountainous areas being for a few region and mountain communities the main form of income. However, wood chain management in these contexts differs from the traditional schemes due to the limits imposed by terrain morphology, both for the operation planning aspects and the hardware requirements. In fact, forest organizational and technical problems require a wider strategic and detailed level of planning to reach the level of productivity of forest operation techniques applied on flatlands. In particular, a perfect knowledge of forest inventories improves long-term management sustainability and efficiency allowing a better understanding of forest ecosystems. However, this knowledge is usually based on historical parcel information with only few cases of remote sensing information from satellite imageries. This is not enough to fully exploit the benefit of the mountain areas forest stocks where the economic and ecological value of each single parcel depends on singletree characteristics. The work presented in this paper, based on the results of the SLOPE (Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas) project, investigates the capability to generate, manage and visualize detailed virtual forest models using geospatial information, combining data acquired from traditional on-the-field laser scanning surveys technologies with new aerial survey through UAV systems. These models are then combined with interactive 3D virtual globes for continuous assessment of resource characteristics, harvesting planning and real-time monitoring of the whole production.

  5. New Approach for forest inventory estimation and timber harvesting planning in mountain areas: the SLOPE project

    Directory of Open Access Journals (Sweden)

    F. Prandi

    2016-06-01

    Full Text Available Forests represent an important economic resource for mountainous areas being for a few region and mountain communities the main form of income. However, wood chain management in these contexts differs from the traditional schemes due to the limits imposed by terrain morphology, both for the operation planning aspects and the hardware requirements. In fact, forest organizational and technical problems require a wider strategic and detailed level of planning to reach the level of productivity of forest operation techniques applied on flatlands. In particular, a perfect knowledge of forest inventories improves long-term management sustainability and efficiency allowing a better understanding of forest ecosystems. However, this knowledge is usually based on historical parcel information with only few cases of remote sensing information from satellite imageries. This is not enough to fully exploit the benefit of the mountain areas forest stocks where the economic and ecological value of each single parcel depends on singletree characteristics. The work presented in this paper, based on the results of the SLOPE (Integrated proceSsing and controL systems fOr sustainable forest Production in mountain arEas project, investigates the capability to generate, manage and visualize detailed virtual forest models using geospatial information, combining data acquired from traditional on-the-field laser scanning surveys technologies with new aerial survey through UAV systems. These models are then combined with interactive 3D virtual globes for continuous assessment of resource characteristics, harvesting planning and real-time monitoring of the whole production.

  6. Spatial and sectoral planning support to sustainable territorial and tourism development of protected mountain areas in Serbia

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2014-01-01

    Full Text Available The starting point for easier resolution of conflicts between conservation and development should be the application of the concept of protected areas of natural heritage as social-ecological systems. This is also the precondition for attainment of strategic planning coordination for protected mountain areas (PMA. The objective of the paper is to provide the insight into the effectiveness of strategic planning support - spatial and sectoral planning - to sustainable territorial and tourism development of PMA in Serbia. The study area comprises Kopaonik and Đerdap National Parks, and Stara Planina Nature Park. This paper evaluates the effectiveness of strategic planning for PMA by means of analysis and evaluation of spatial plans, Strategic Environmental Assessment (SEA and sector plans in tourism for the study area. The effectiveness of spatial planning is checked based on the analysis and evaluation of sustainability of zoning and land-use regimes, and of tourism development proposed by spatial plans for the study area. The conclusion is that it is necessary to apply holistic approach to sector planning for nature conservation and tourism development, and to apply SEA for tourism planning as well. Reduction of the spatial coverage of PMA and spatial differentiation of protected zones from the ones planned for intensive development is recommended.

  7. Air defense planning for an area with the use of very short range air defense sets

    Directory of Open Access Journals (Sweden)

    Tadeusz Pietkiewicz

    2017-12-01

    Full Text Available This paper presents a heuristic method of planning the deployment of very short-range anti-air missile and artillery sets (VSHORAD around an area (‘protected area’ in order to protect it. A function dependent on the distance between the earliest feasible points of destroying targets and the centre of the protected area was taken as an objective function. This is a different indicator from those commonly used in the literature, and based on the likelihood of a defense zone penetration by means of an air attack (MAA: the kill probability of the MAA and the probability of area losses. The model constraints resulted directly from the restrictions imposed by real air defense systems and the nature of the area being defended. This paper assumes that the VSHORAD system operates as a part of a general, superordinate air defense command and control system based on the idea of network-centric warfare, which provides the VSHORAD system with a recognized air picture, air defense plans, and combat mission specifications. The presented method has been implemented. The final part of the paper presents the computational results. Keywords: optimal planning, air defense system, area installation protection, deployment of very short range anti-air missile and artillery sets (VSHORAD

  8. Toward an Institutional-Contingency View of School Organization.

    Science.gov (United States)

    Talbert, Joan E.

    Based on an institutional-contingency view, this study focuses on ways in which public and private school sectors in six San Francisco area counties embody different organizational logistics and authority principles, including rational-legal, traditional, and local-market. Results suggest that, among other characteristics, nonreligious private…

  9. Alternative Approaches to the Analysis of Multidimensional Contingency Tables

    Directory of Open Access Journals (Sweden)

    Iva Pecáková

    2011-12-01

    Full Text Available The practical analyses of interactions between categorical variables in various areas (such as public opinion research or marketing research are often only applications of chi-square tests in two-way contingency tables. However, in many situations it is impossible to use large-sample approximations to sampling distributions when theiradequacy can be in doubt. It is known, that these approximations may be very poor when the contingency table contains very small expected frequencies. However, recent work has shown that these approximations can be very poor when the contingency table contains both small and large expected frequencies. Of course, the rule of thumb of a minimum expected frequency is not met either in the case of sparse table. The article deals with alternative approaches to the data analysis in such cases. It points out other possibilities and shows that thanks to the development of computer technology exact methods previously only difficult usable are available for this purpose.

  10. 77 FR 55224 - Notice of Availability of the Proposed Imperial Sand Dunes Recreation Area Management Plan and...

    Science.gov (United States)

    2012-09-07

    ... Availability of the Proposed Imperial Sand Dunes Recreation Area Management Plan and California Desert... California Desert Conservation Area (CDCA) Plan Amendment/Final Environmental Impact Statement (EIS), for the.... District Court in September 2006. Portions of the biological opinion for the Peirson's milkvetch were also...

  11. 75 FR 27286 - McKelvie Geographic Area Range Allotment Management Planning on the Samuel R. McKelvie National...

    Science.gov (United States)

    2010-05-14

    ... range allotment management planning on the McKelvie Geographic Area, Samuel R. McKelvie National Forest... DEPARTMENT OF AGRICULTURE Forest Service McKelvie Geographic Area Range Allotment Management Planning on the Samuel R. McKelvie National Forest, Bessey Ranger District in Nebraska AGENCY: Forest...

  12. 75 FR 4102 - Folsom Lake State Recreation Area and Folsom Power House State Historic Park General Plan...

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Folsom Lake State Recreation Area and Folsom Power House State Historic Park General Plan/Resource Management Plan AGENCY: Bureau of Reclamation... review and comment a joint Final EIS/EIR for the Folsom Lake State Recreation Area and Folsom Power House...

  13. The state of art of contingency and emergency plans for oil spill in the Brazilian ports and terminals; O estado da arte dos planos de emergencia e contingencia para derramamento de oleo nos portos e terminais brasileiros

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Sergio R.; Wasserman, Julio C.; Lima, Gilson B.A. [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2008-07-01

    Brazilian legislation establishes that the potentially polluting activities, as is the case of the ports and terminals, possess plans of emergency for spilling in order to prevent impacts to the physical, socio cultural and of the work environment. The Federal Law n. 9966, of April 2000, known as the 'Law of the Oil' established the basic principles, to be obeyed for the companies, for harmful or dangerous oil movement and other substances in ports, terminals, platforms and ships in waters under national jurisdiction. The Law defines that the emergency plans are a set of measures that determine the responsibilities and the actions to be unchained after an incident immediately, as well as define the human resources, material and adequate equipment to the prevention, has controlled and combat to the pollution of waters. The CONAMA n. 398, of June of 2008, create a standardization of those procedures, so that there is an integration among the several emergency plans in a certain area. This article has for objective to accomplish a diagnosis in the several institutional programs of emergency to identify the current situation in the organized and terminal ports specialized in liquid barns, evaluating, when possible, it rationality of support logistic, the organization of operational administration and integration. (author)

  14. The state of art of contingency and emergency plans for oil spill in the Brazilian ports and terminals; O estado da arte dos planos de emergencia e contingencia para derramamento de oleo nos portos e terminais brasileiros

    Energy Technology Data Exchange (ETDEWEB)

    Barros, Sergio R; Wasserman, Julio C; Lima, Gilson B.A. [Universidade Federal Fluminense (UFF), Niteroi, RJ (Brazil)

    2008-07-01

    Brazilian legislation establishes that the potentially polluting activities, as is the case of the ports and terminals, possess plans of emergency for spilling in order to prevent impacts to the physical, socio cultural and of the work environment. The Federal Law n. 9966, of April 2000, known as the 'Law of the Oil' established the basic principles, to be obeyed for the companies, for harmful or dangerous oil movement and other substances in ports, terminals, platforms and ships in waters under national jurisdiction. The Law defines that the emergency plans are a set of measures that determine the responsibilities and the actions to be unchained after an incident immediately, as well as define the human resources, material and adequate equipment to the prevention, has controlled and combat to the pollution of waters. The CONAMA n. 398, of June of 2008, create a standardization of those procedures, so that there is an integration among the several emergency plans in a certain area. This article has for objective to accomplish a diagnosis in the several institutional programs of emergency to identify the current situation in the organized and terminal ports specialized in liquid barns, evaluating, when possible, it rationality of support logistic, the organization of operational administration and integration. (author)

  15. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2007-09-01

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure

  16. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    International Nuclear Information System (INIS)

    NSTec Environmental Management

    2007-01-01

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure

  17. A conservation planning approach to mitigate the impacts of leakage from protected area networks.

    Science.gov (United States)

    Bode, Michael; Tulloch, Ayesha I T; Mills, Morena; Venter, Oscar; Ando, Amy W

    2015-06-01

    Protected area networks are designed to restrict anthropogenic pressures in areas of high biodiversity. Resource users respond by seeking to replace some or all of the lost resources from locations elsewhere in the landscape. Protected area networks thereby perturb the pattern of human pressures by displacing extractive effort from within protected areas into the broader landscape, a process known as leakage. The negative effects of leakage on conservation outcomes have been empirically documented and modeled using homogeneous descriptions of conservation landscapes. Human resource use and biodiversity vary greatly in space, however, and a theory of leakage must describe how this heterogeneity affects the magnitude, pattern, and biodiversity impacts of leakage. We combined models of household utility, adaptive human foraging, and biodiversity conservation to provide a bioeconomic model of leakage that accounts for spatial heterogeneity. Leakage had strong and divergent impacts on the performance of protected area networks, undermining biodiversity benefits but mitigating the negative impacts on local resource users. When leakage was present, our model showed that poorly designed protected area networks resulted in a substantial net loss of biodiversity. However, the effects of leakage can be mitigated if they are incorporated ex-ante into the conservation planning process. If protected areas are coupled with nonreserve policy instruments such as market subsidies, our model shows that the trade-offs between biodiversity and human well-being can be further and more directly reduced. © 2014 Society for Conservation Biology.

  18. Socioeconomic issues for the Bear River Watershed Conservation Land Area Protection Plan

    Science.gov (United States)

    Thomas, Catherine Cullinane; Huber, Christopher; Gascoigne, William; Koontz, Lynne

    2012-01-01

    The Bear River Watershed Conservation Area is located in the Bear River Watershed, a vast basin covering fourteen counties across three states. Located in Wyoming, Utah, and Idaho, the watershed spans roughly 7,500 squares miles: 1,500 squares miles in Wyoming; 2,700 squares miles in Idaho; and 3,300 squares miles in Utah (Utah Division of Water Resources, 2004). Three National Wildlife Refuges are currently contained within the boundary of the BRWCA: the Bear River Migratory Bird Refuge in Utah, the Bear Lake National Wildlife Refuge in Idaho, and the Cokeville Meadows National Wildlife Refuge in Wyoming. In 2010, the U.S. Fish and Wildlife Service conducted a Preliminary Project Proposal and identified the Bear River Watershed Conservation Area as having high-value wildlife habitat. This finding initiated the Land Protection Planning process, which is used by the U.S. Fish and Wildlife Service to study land conservation opportunities including adding lands to the National Wildlife Refuge System. The U.S. Fish and Wildlife Service proposes to include part of the Bear River Watershed Conservation Area in the Refuge System by acquiring up to 920,000 acres of conservation easements from willing landowners to maintain landscape integrity and habitat connectivity in the region. The analysis described in this report provides a profile of the social and economic conditions in the Bear River Watershed Conservation Area and addresses social and economic questions and concerns raised during public involvement in the Land Protection Planning process.

  19. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2001-01-01

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  20. Study on the methods of rational analysis about the area of the Planning of Sea Usage of Regional Construction

    Science.gov (United States)

    Ya-Juan, Li; Tian-Yu, Mao; Mingjing-Tian

    2018-03-01

    The Planning of Sea Usage of Regional Construction is a new area, and the rational analysis about the area of which is one of its difficulties. Based on “Urban land classification and land use planning and construction standards”, the land use control index method study the rationality of the sea usage area of the whole region, by accumulating for specific land use indicators for each land type within the planning area. This paper, takeing the project named “caofeidian integrated service area” for example, make a little study on the land use control index method used by the sea usage demonstration of the planning of sea usage of regional construction. The study will be good for improving the technical methods of rational analysis about the area of the planning of sea usage of regional construction.

  1. Tsunami evacuation analysis, modelling and planning: application to the coastal area of El Salvador

    Science.gov (United States)

    Gonzalez-Riancho, Pino; Aguirre-Ayerbe, Ignacio; Aniel-Quiroga, Iñigo; Abad Herrero, Sheila; González Rodriguez, Mauricio; Larreynaga, Jeniffer; Gavidia, Francisco; Quetzalcoalt Gutiérrez, Omar; Álvarez-Gómez, Jose Antonio; Medina Santamaría, Raúl

    2014-05-01

    Advances in the understanding and prediction of tsunami impacts allow the development of risk reduction strategies for tsunami-prone areas. Conducting adequate tsunami risk assessments is essential, as the hazard, vulnerability and risk assessment results allow the identification of adequate, site-specific and vulnerability-oriented risk management options, with the formulation of a tsunami evacuation plan being one of the main expected results. An evacuation plan requires the analysis of the territory and an evaluation of the relevant elements (hazard, population, evacuation routes, and shelters), the modelling of the evacuation, and the proposal of alternatives for those communities located in areas with limited opportunities for evacuation. Evacuation plans, which are developed by the responsible authorities and decision makers, would benefit from a clear and straightforward connection between the scientific and technical information from tsunami risk assessments and the subsequent risk reduction options. Scientifically-based evacuation plans would translate into benefits for the society in terms of mortality reduction. This work presents a comprehensive framework for the formulation of tsunami evacuation plans based on tsunami vulnerability assessment and evacuation modelling. This framework considers (i) the hazard aspects (tsunami flooding characteristics and arrival time), (ii) the characteristics of the exposed area (people, shelters and road network), (iii) the current tsunami warning procedures and timing, (iv) the time needed to evacuate the population, and (v) the identification of measures to improve the evacuation process, such as the potential location for vertical evacuation shelters and alternative routes. The proposed methodological framework aims to bridge the gap between risk assessment and risk management in terms of tsunami evacuation, as it allows for an estimation of the degree of evacuation success of specific management options, as well as

  2. Planning of Green Space Ecological Network in Urban Areas: An Example of Nanchang, China.

    Science.gov (United States)

    Li, Haifeng; Chen, Wenbo; He, Wei

    2015-10-15

    Green space plays an important role in sustainable urban development and ecology by virtue of multiple environmental, recreational, and economic benefits. Constructing an effective and harmonious urban ecological network and maintaining a sustainable living environment in response to rapid urbanization are the key issues required to be resolved by landscape planners. In this paper, Nanchang City, China was selected as a study area. Based on a series of landscape metrics, the landscape pattern analysis of the current (in 2005) and planned (in 2020) green space system were, respectively, conducted by using FRAGSTATS 3.3 software. Considering the actual situation of the Nanchang urban area, a "one river and two banks, north and south twin cities" ecological network was constructed by using network analysis. Moreover, the ecological network was assessed by using corridor structure analysis, and the improvement of an ecological network on the urban landscape was quantitatively assessed through a comparison between the ecological network and green space system planning. The results indicated that: (1) compared to the green space system in 2005, the planned green space system in 2020 of the Nanchang urban area will decline in both districts (Changnan and Changbei districts). Meanwhile, an increase in patch density and a decrease in mean patch size of green space patches at the landscape level implies the fragmentation of the urban green space landscape. In other words, the planned green space system does not necessarily improve the present green space system; (2) the ecological network of two districts has high corridor density, while Changnan's ecological network has higher connectivity, but Changbei's ecological network is more viable from an economic point of view, since it has relatively higher cost efficiency; (3) decrease in patch density, Euclidean nearest neighbor distance, and an increase in mean patch size and connectivity implied that the ecological network

  3. An optimized field coverage planning approach for navigation of agricultural robots in fields involving obstacle areas

    DEFF Research Database (Denmark)

    Hameed, Ibahim; Bochtis, D.; Sørensen, C.A.

    2013-01-01

    -field obstacle areas, the headland paths generation for the field and each obstacle area, the implementation of a genetic algorithm to optimize the sequence that the field robot vehicle will follow to visit the blocks, and an algorithmically generation of the task sequences derived from the farmer practices......Technological advances combined with the demand of cost efficiency and environmental considerations lead farmers to review their practices towards the adoption of new managerial approaches including enhanced automation. The application of field robots is one of the most promising advances among....... This approach has proven that it is possible to capture the practices of farmers and embed these practices in an algorithmic description providing a complete field area coverage plan in a form prepared for execution by the navigation system of a field robot....

  4. Protected Areas' Impacts on Brazilian Amazon Deforestation: Examining Conservation-Development Interactions to Inform Planning.

    Science.gov (United States)

    Pfaff, Alexander; Robalino, Juan; Herrera, Diego; Sandoval, Catalina

    2015-01-01

    Protected areas are the leading forest conservation policy for species and ecoservices goals and they may feature in climate policy if countries with tropical forest rely on familiar tools. For Brazil's Legal Amazon, we estimate the average impact of protection upon deforestation and show how protected areas' forest impacts vary significantly with development pressure. We use matching, i.e., comparisons that are apples-to-apples in observed land characteristics, to address the fact that protected areas (PAs) tend to be located on lands facing less pressure. Correcting for that location bias lowers our estimates of PAs' forest impacts by roughly half. Further, it reveals significant variation in PA impacts along development-related dimensions: for example, the PAs that are closer to roads and the PAs closer to cities have higher impact. Planners have multiple conservation and development goals, and are constrained by cost, yet still conservation planning should reflect what our results imply about future impacts of PAs.

  5. Prognosis: The Plan of Integrated Tourism Area of Kapuk Naga Beach, Tangerang, West Java

    Directory of Open Access Journals (Sweden)

    Kuswaji Dwi Priyono

    2004-01-01

    Full Text Available This paper  tries to analyze of prognosis of the Integrated Tourism Area Planning of Kapuknnaga Beach (KWTPK Tangerang Regency West Java. The two method applied to compose the prognosis are extrapolation and indication. The extrapolation is based on the local area infomation data of contemporary knowledge in the past and presence, while the indication method utilizes the whole interrelation activities programmed with the possible consequences. Land function transformation effects of KWTPK will cause environmental destroy as annual flsh flood, salt water intrusion and polution of urban’s industry sewage. As further effect there is a raising of turbidity and nitrition degree of sedimentation which make coral-ridge degradation toward annihilation. The coral-ridge annihilation will cause the sea waves power collide with the seashore area directly which threatens KWTPK.

  6. Systematic Layout Planning of a Radiology Reporting Area to Optimize Radiologists' Performance.

    Science.gov (United States)

    Benitez, Guilherme Brittes; Fogliatto, Flavio Sanson; Cardoso, Ricardo Bertoglio; Torres, Felipe Soares; Faccin, Carlo Sasso; Dora, José Miguel

    2018-04-01

    Optimizing radiologists' performance is a major priority for managers of health services/systems, since the radiologists' reporting activity imposes a severe constraint on radiology productivity. Despite that, methods to optimize radiologists' reporting workplace layout are scarce in the literature. This study was performed in the Radiology Division (RD) of an 850-bed University-based general hospital. The analysis of the reporting workplace layout was carried out using the systematic layout planning (SLP) method, in association with cluster analysis as a complementary tool in early stages of SLP. Radiologists, architects, and hospital managers were the stakeholders consulted for the completion of different stages of the layout planning process. A step-by-step description of the proposed methodology to plan an RD reporting layout is presented. Clusters of radiologists were defined using types of exams reported and their frequency of occurrence as clustering variables. Sectors with high degree of interaction were placed in proximity in the new RD layout, with separation of noisy and quiet areas. Four reporting cells were positioned in the quiet area, grouping radiologists by subspecialty, as follows: cluster 1-abdomen; cluster 2-musculoskeletal; cluster 3-neurological, vascular and head & neck; cluster 4-thoracic and cardiac. The creation of reporting cells has the potential to limit unplanned interruptions and enhance the exchange of knowledge and information within cells, joining radiologists with the same expertise. That should lead to improvements in productivity, allowing managers to more easily monitor radiologists' performance.

  7. The research on regional conservation planning of urban historical and cultural areas based on GIS

    Science.gov (United States)

    Li, Shangli; Xu, Jian; Li, Qian

    2017-06-01

    With the rapid economic development and the growth of population happening in the urban historical and cultural areas, heritage and historical buildings along with their natural and artificial surrounding environments are suffering constructive destruction. Due to the lack of precise partition of protection region and construction control region in the local cultural relics protection law, traditional regional conservation planning cannot engaged with the urban controllability detailed planning very well. According to the several protection regulations about heritage and historical buildings from latest laws, we choose Baxian Temple area to study on the improvments of traditional regional conservation planning. The technical methods of this study mainly rely on GIS, which can complete the fundamental work of each stage. With the analytic hierarchy process(AHP), the comprehensive architectural value assessments can be calculated according to the investigation results. Based on the calculation results and visual corridor analysis, the precise range of protection region and construction control region can be decided and the specific protection measures can be formulated.

  8. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern

    International Nuclear Information System (INIS)

    2000-01-01

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  9. Environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This document presents an Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG 6) at Oak Ridge National Laboratory (ORNL). This document updates a draft monitoring plan developed in 1993. The draft plan was never finalized awaiting resolution of the mechanisms for addressing RCRA concerns at a site where the CERCLA process resulted in a decision to defer action, i.e., postpone closure indefinitely. Over the past two years the Tennessee Department of Environment and Conservation (TDEC), US Department of Energy (DOE), and US Environmental Protection Agency (EPA) Region IV, have agreed that RCRA authority at the site will be maintained through a post- closure permit; ''closure'' in this case referring to deferred action. Both a Revised Closure Plan (DOE 1995a) and a Post-Closure Permit Application (DOE 1995b) have been developed to document this agreement; relevant portions of the EMP will be included in the RCRA Post-Closure Permit Application. As the RCRA issues were being negotiated, DOE initiated monitoring at WAG 6. The purpose of the monitoring activities was to (1) continue to comply with RCRA groundwater quality assessment requirements, (2) install new monitoring equipment, and (3) establish the baseline conditions at WAG 6 against which changes in contaminant releases could be measured. Baseline monitoring is scheduled to end September 30, 1995. Activities that have taken place over the past two years are summarized in this document

  10. Underground Test Area Project Waste Management Plan (Rev. No. 2, April 2002)

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) initiated the UGTA Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada Test Site (NTS). The UGTA Project investigation sites have been grouped into Corrective Action Units (CAUs) in accordance with the most recent version of the Federal Facility Agreement and Consent Order. The primary UGTA objective is to gather data to characterize the groundwater aquifers beneath the NTS and adjacent lands. The investigations proposed under the UGTA program may involve the drilling and sampling of new wells; recompletion, monitoring, and sampling of existing wells; well development and hydrologic/ aquifer testing; geophysical surveys; and subsidence crater recharge evaluation. Those wastes generated as a result of these activities will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NV waste minimization and pollution prevention objectives. This Waste Management Plan provides a general framework for all Underground Test Area (UGTA) Project participants to follow for the characterization, storage/accumulation, treatment, and disposal of wastes generated by UGTA Project activities. The objective of this waste management plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Attachment 1 to this plan is the Fluid Management Plan and details specific strategies for management of fluids produced under UGTA operations

  11. Decontamination and inspection plan for Phase 3 closure of the 300 area waste acid treatment system

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    This decontamination and inspection plan (DIP) describes decontamination and verification activities in support of Phase 3 closure of the 300 Area Waste Acid Treatment System (WATS). Phase 3 is the third phase of three WATS closure phases. Phase 3 attains clean closure conditions for WATS portions of the 334 and 311 Tank Farms (TF) and the 333 and 303-F Buildings. This DIP also describes designation and management of waste and debris generated during Phase 3 closure activities. Information regarding Phase 1 and Phase 2 for decontamination and verification activities closure can be found in WHC-SD-ENV-AP-001 and HNF-1784, respectively. This DIP is provided as a supplement to the closure plan (DOE/RL-90-11). This DIP provides the documentation for Ecology concurrence with Phase 3 closure methods and activities. This DIP is intended to provide greater detail than is contained in the closure plan to satisfy Ecology Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 requirement that closure documents describe the methods for removing, transporting, storing, and disposing of all dangerous waste at the unit. The decontamination and verification activities described in this DIP are based on the closure plan and on agreements reached between Ecology and the U.S. Department of Energy, Richland Operations Office (DOE-RL) during Phase 3 closure activity workshops and/or project manager meetings (PMMs)

  12. Facility effluent monitoring plan for the 300 Area Fuels Fabrication Facility

    International Nuclear Information System (INIS)

    Nickels, J.M.; Brendel, D.F.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP- 0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring system by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years. The Fuel Fabrication Facility in the Hanford 300 Area supported the production reactors from the 1940's until they were shut down in 1987. Prior to 1987 the Fuel Fabrication Facility released both airborne and liquid radioactive effluents. In January 1987 the emission of airborne radioactive effluents ceased with the shutdown of the fuels facility. The release of liquid radioactive effluents have continued although decreasing significantly from 1987 to 1990

  13. WIPP Sampling and Analysis Plan for Solid Waste Management Units and Areas of Concern

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2000-05-23

    This Sampling and Analysis Plan (SAP) has been prepared to fulfill requirements of Module VII, Section VII.M.2 and Table VII.1, requirement 4 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED [New Mexico Environment Department], 1999a). This SAP describes the approach for investigation of the Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. This SAP addresses the current Permit requirements for a RCRA Facility Investigation(RFI) investigation of SWMUs and AOCs. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the RFI specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI work plan and report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can beentered either before or after a RFI work plan. According to NMED's guidance, a facility can prepare a RFI work plan or SAP for any SWMU or AOC (NMED, 1998).

  14. Fuzzy-set based contingency ranking

    International Nuclear Information System (INIS)

    Hsu, Y.Y.; Kuo, H.C.

    1992-01-01

    In this paper, a new approach based on fuzzy set theory is developed for contingency ranking of Taiwan power system. To examine whether a power system can remain in a secure and reliable operating state under contingency conditions, those contingency cases that will result in loss-of-load, loss-of generation, or islanding are first identified. Then 1P-1Q iteration of fast decoupled load flow is preformed to estimate post-contingent quantities (line flows, bus voltages) for other contingency cases. Based on system operators' past experience, each post-contingent quantity is assigned a degree of severity according to the potential damage that could be imposed on the power system by the quantity, should the contingency occurs. An approach based on fuzzy set theory is developed to deal with the imprecision of linguistic terms

  15. Identification of soil erosion risk areas for conservation planning in different states of India.

    Science.gov (United States)

    Sharda, V N; Mandal, Debashis; Ojasvi, P R

    2013-03-01

    Assessment of soil erosion risks, especially in the developing countries, is a challenging task mainly due to non-availability or insufficiency of relevant data. In this paper, the soil erosion risks have been estimated by integrating the spatial data on potential erosion rates and soil loss tolerance limits for conservation planning at state level in India. The erosion risk classes have been prioritized based upon the difference between the prevailing erosion rates and the permissible erosion limits. The analysis revealed that about 50% of total geographical area (TGA) of India, falling in five priority erosion risk classes, requires different intensity of conservation measures though about 91% area suffers from potential erosion rates varying from 40 t ha(-1) yr(-1). Statewise analysis indicated that Andhra Pradesh, Maharashtra and Rajasthan share about 75% of total area under priority Class 1 (6.4 M ha) though they account for only 19.4% of the total area (36.2 M ha) under very severe potential erosion rate category (> 40 t ha(-1)yr(-1)). It was observed that about 75% of total geographical area (TGA) in the states of Bihar, Gujarat, Haryana, Kerala and Punjab does not require any specific soil conservation measure as the potential erosion rates are well within the tolerance limits. The developed methodology can be successfully employed for prioritization of erosion risk areas at watershed, region or country level.

  16. Evolving protected-area impacts in Panama: impact shifts show that plans require anticipation

    International Nuclear Information System (INIS)

    Haruna, Akiko; Pfaff, Alexander; Van den Ende, Sander; Joppa, Lucas

    2014-01-01

    Protected areas (PAs) are the leading forest conservation policy, so accurate evaluation of future PA impact is critical in conservation planning. Yet by necessity impact evaluations use past data. Here we argue that forward-looking plans should blend such evaluations with anticipation of shifts in threats. Applying improved methods to evaluate past impact, we provide rigorous support for that conceptual approach by showing that PAs’ impacts on deforestation shifted with land use. We study the Republic of Panama, where species-dense tropical forest faces real pressure. Facing variation in deforestation pressure, the PAs’ impacts varied across space and time. Thus, if shifts in pressure levels and patterns could be anticipated, that could raise impact. (paper)

  17. Tanks Focus Area Alternative Salt Processing Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, Harry D.

    2000-05-15

    In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA)to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

  18. Tanks Focus Area Alternative Salt Processing Research and Development Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harmon, Harry D.

    2000-11-30

    In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA) to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

  19. Contingency Operations of Americas Next Moon Rocket, Ares V

    Science.gov (United States)

    Jaap, John; Richardson, Lea

    2010-01-01

    and cause of a partially separated payload shroud. Other mitigations are really alternate missions; example, an engine out on during ascent resulted in insufficient propellant for the lunar mission, but the on-orbit vehicle stack is otherwise perfect and can pursue an alternate mission, such as a high ballistic trajectory to test the high-speed atmospheric reentry of Orion. Evaluation and presentation of contingency operations at this early stage of the development of the Ares V rocket will improve the design of the vehicle and lay the groundwork for the exhaustive contingency planning which must be done after the vehicle is built as preparations for operations.

  20. Effective operational oil spill response planning

    International Nuclear Information System (INIS)

    Meyers, R.J.

    1991-01-01

    An operational Contingency Plan is one of the single most important aspects of effective oil spill response operations. It is a spill control game plan. A thorough contingency plan provides a set of guidelines that can be used to help direct all phases of spill response activities. More than simple a compilation of lists and rosters, the contingency plan reflects strategic and philosophical elements of spill response that help to ensure a viable response to any spill incident. Facilities and oil carrying vessels should have well maintained contingency plans with these features. This paper describes the requirement for effective oil spill response pans and the training required to exercise them

  1. Counterfactual reasoning for regretted situations involving controllable versus uncontrollable events: the modulating role of contingent self-esteem.

    Science.gov (United States)

    Wilkinson, Meredith R; Ball, Linden J; Alford, David

    2015-01-01

    We report a study that examined the modulating impact of contingent self-esteem on regret intensity for regretted outcomes associated with controllable versus uncontrollable events. The Contingent Self-Esteem Scale (e.g., Kernis & Goldman, 2006) was used to assess the extent to which a person's sense of self-worth is based on self and others' expectations. We found that there was an influence of self-esteem contingency for controllable but not for uncontrollable regret types. For controllable regret types individuals with a high contingent (i.e., unstable) self-esteem reported greater regret intensity than those with a low contingent (i.e., stable) self-esteem. We interpret this finding as reflecting a functional and adaptive role of high contingent self-esteem in terms of mobilizing the application of counterfactual reasoning and planning mechanisms that can enable personal expectations to be achieved in the future.

  2. Counterfactual Reasoning for Regretted Situations Involving Controllable Versus Uncontrollable Events: The Modulating Role of Contingent Self-Esteem

    Science.gov (United States)

    Wilkinson, Meredith R.; Ball, Linden J.; Alford, David

    2015-01-01

    We report a study that examined the modulating impact of contingent self-esteem on regret intensity for regretted outcomes associated with controllable versus uncontrollable events. The Contingent Self-Esteem Scale (e.g., Kernis & Goldman, 2006) was used to assess the extent to which a person’s sense of self-worth is based on self and others’ expectations. We found that there was an influence of self-esteem contingency for controllable but not for uncontrollable regret types. For controllable regret types individuals with a high contingent (i.e., unstable) self-esteem reported greater regret intensity than those with a low contingent (i.e., stable) self-esteem. We interpret this finding as reflecting a functional and adaptive role of high contingent self-esteem in terms of mobilizing the application of counterfactual reasoning and planning mechanisms that can enable personal expectations to be achieved in the future. PMID:25883697

  3. Gulf of Mexico Sales 142 and 143: Central and western planning areas

    International Nuclear Information System (INIS)

    1992-11-01

    This environmental impact statement (EIS) addresses two proposed Federal actions, lease Sales 142 and 143, that will offer for lease Gulf of Mexico Outer Continental Shelf (OCS) areas that may contain economically recoverable oil and gas resources. The lease sales are proposed for 1993 and include lease blocks in the Central Gulf of Mexico Planning Area (CPA) and Western Gulf of Mexico Planning Area (WPA). Up to 10,099 blocks will be available for lease under the two proposed actions; only a small percentage is expected to be actually leased. On average, 401 blocks in the Central Gulf and 264 blocks in the Western Gulf have been leased in individual Gulf of Mexico OCS lease sales since 1984. Of the blocks that will be leased as a result of the two proposed actions, only a portion will be drilled and result in subsequent production. The scoping process was used to obtain information and comments on the proposed actions and the potential environmental effects from diverse interests, including the affected States, Federal agencies, the petroleum industry, environmental and public interest groups, and concerned individuals. The input from these sources aided in the identification of significant issues, possible alternatives to the proposed actions, and potential mitigating measures

  4. Groundwater Monitoring Plan for the Z-Area Saltstone Disposal Facility, Revision 3

    International Nuclear Information System (INIS)

    WELLS, DANIEL

    2005-01-01

    Groundwater monitoring has been conducted at the Z-Area Saltstone Disposal Facility since 1987. At that time, groundwater monitoring was not required by the industrial landfill regulations, but a modest monitoring program was required by the operating permit. At the time of the 1996 permit renewal, it was determined that a more robust monitoring program was needed. The draft permit required new monitoring wells within 25 feet of each active disposal cell. As an alternative, SRS proposed a program based on direct push sampling. This program called for biennial direct push sampling within 25 feet of each waste-containing cell with additional samples being taken in areas where excessive cracking had been observed. The direct push proposal was accepted by The South Carolina Department of Health and Environmental Control (SCDHEC), and was incorporated by reference into the Z-Area Saltstone Industrial Solid Waste Permit, No.025500-1603. The Industrial Solid Waste Landfill Regulations were revised in 1998 and now include specific requirements for groundwater monitoring. SRS's plan for complying with those regulations is discussed below. The plan calls for a return to traditional monitoring with permanent wells. It also proposes a more technically sound monitoring list based on the actual composition of saltstone

  5. Gulf of Mexico Sales 142 and 143: Central and western planning areas

    International Nuclear Information System (INIS)

    1992-11-01

    This environmental impact statement (EIS) addresses two proposed Federal actions, lease Sales 142 and 143, that will offer for lease Gulf of Mexico Outer Continental Shelf (OCS) areas that may contain economically recoverable oil and gas resources. The lease sales are proposed for 1993 and include lease blocks in the Central Gulf of Mexico Planning Area (CPA) and Western Gulf of Mexico Planning Area (WPA). Up to 10,099 blocks will be available for lease under the two proposed actions; only a small percentage is expected to be actually leased. On average, 401 blocks in the Central Gulf and 264 blocks in the Western Gulf have been leased in individual Gulf of Mexico OCS lease sales since 1984. Of the blocks that will be leased as a result of the two proposed actions, only a portion will be drilled and result in subsequent production. The scoping process was used to obtain information and comments on the proposed actions and the potential environmental effects from diverse interests, including the affected States, Federal agencies, the petroleum industry, environmental and public interest groups, and concerned individuals. This volume, Volume 2, reports on impacts from Sales 142 and 143

  6. [How to carry out work on family planning after adopting production responsibility systems in rural areas].

    Science.gov (United States)

    Xiao, S H

    1982-05-29

    After the Third Meeting of the Eleventh People's Congress, the entire responsibility for agricultural production was transferred to a lower level. Peasants in various areas have adopted the so called production responsibility system, and the phenomenon of an increased population rate has also appeared in some areas. In this article, the author discusses how to solve these problems created by the new situation. The 1st step is try to control population growth through socialist propaganda education, administrative measures, economic incentives and punishments, and family planning work. The 2nd step is to popularize the practice of having only 1 child per household in the rural areas. The 2nd and 3rd child in each family should be controlled and prohibited. This policy formulated by the Central Government should be carried out thoroughly. Families which follow the policy and have only 1 child should be encouraged with economic rewards, and those families which have 2 or more children should be punished economically. The 3rd step is to establish a national work team to be in charge of family planning and birth control. There should be an ideological unity among the nation's leadership. Party members and cadres should establish themselves as good examples for the people so that the population control work may become successful.

  7. Web Application for Coastal Area Planning through Analysis of Landslide and Soil Consumption

    Science.gov (United States)

    Panizzoni, Giulio; Debiasi, Alberto; Eccher, Matteo; De Amicis, Raffaele

    2016-04-01

    Global warming and rapid climatic changes are producing dramatic effects on coastal area of Mediterranean countries. Italian coastal areas are one of the most urbanized zones of the south western Europe and the extensive use of soil is causing a consistent impact on the hydrogeological context. Moreover, soil consumption combined with extreme meteorological events, facilitates the occurrence of hazardous landslide events. Environmental policy makers and data managers in territorial planning need to face such emergency situation with appropriate tools. We present an application service with the aim of advising user through environmental analysis of Landslide and Soil Consumption impact. This service wants also to improve the sharing of environmental harmonized datasets/metadata across different organizations and the creation of a collaborative environment where the stakeholders and environmental experts can share their data and work cooperatively. We developed a set of processing services providing functionalities to assess impact of landslide on territory and impact of land take and soil sealing. Among others, the service is able to evaluate environmental impacts of landslide events on Cultural Heritage sites. We have also designed a 3D WebGL client customized to execute the processing services and visualize their outputs. It provides high usability in terms of navigation and data visualization. In this way the service provides not only a Spatial Data Infrastructure to access and visualize data but a complete Decision Support Systems for a more effective environmental planning of coastal area.

  8. Contingent factors affecting network learning

    OpenAIRE

    Peters, Linda D.; Pressey, Andrew D.; Johnston, Wesley J.

    2016-01-01

    To increase understanding of the impact of individuals on organizational learning processes, this paper explores the impact of individual cognition and action on the absorptive capacity process of the wider network. In particular this study shows how contingent factors such as social integration mechanisms and power relationships influence how network members engage in, and benefit from, learning. The use of cognitive consistency and sensemaking theory enables examination of how these conting...

  9. Municipal community gardens in the metropolitan area of Milano. Assessment and planning criteria

    Directory of Open Access Journals (Sweden)

    Giulio Senes

    2016-06-01

    Full Text Available A community garden (CG can generally be defined as a piece of land gardened collectively by a group of people that grow their produce on shared lots that have been divided into smaller plots. Some gardens are grown collectively, are divided into different plots for individual and family use; CGs are usually located in urban or peri-urban areas. As a growing portion of the urban open space network, CGs are contributing to land preservation, access to open space, and sustainable re-use of vacant land. They promote healthy communities and provide food security for many. In this context, the object of the study are the municipal community gardens (MCGs, a specific typology of CGs provided for land-use planning legislation and practice as an urban service with social function, made available to the community by the municipalities and assigned to be cultivated to citizens (usually seniors/retired people. In particular, the study aimed: i to evaluate the presence of MCGs in the città metropolitana di Milano (the former province of Milano; and ii to define criteria for new MCGs settlement, using existing geo-database and geographical information system to make it replicable in other settings. For the first topic the 133 municipalities of the former province of Milano (excluded the city of Milano were analysed. Only 59 municipalities had presence of MCGs. The average area per capita of MCGs is 0.68 sq.m/inhab. (if we exclude Rodano, an outlier with 35 sq.m/inhab.. An overlay with land use map has permitted to define the relationships between the MCGs and their surrounding territory. The major part of MCGs are included in urban or suburban areas. For the second goal, the land area to be allocated for new MCGs was assessed for each municipality, comparing area of existing MCGs and a minimum required area (calculated on the basis of the inhabitants number. Finally a method was proposed to locate the new MCGs areas. Criteria used to identify suitable areas

  10. Revised ground-water monitoring compliance plan for the 300 area process trenches

    Energy Technology Data Exchange (ETDEWEB)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.; Carlile, J.V.M.; Freshley, M.D.; Liikala, T.L.; Mitchell, P.J.; Olsen, K.B.; Rieger, J.T.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.

  11. The South African fruit fly action plan: area-wide suppression and exotic species surveillance

    Energy Technology Data Exchange (ETDEWEB)

    Barnes, Brian N., E-mail: barnesb@arc.agric.z [ARC Infruitec-Nietvoorbij Institute for Fruit, Vine and Wine, Stellenbosch (South Africa); Venter, Jan-Hendrik, E-mail: janhendrikv@nda.agric.z [Directorate Plant Health, Pretoria (South Africa)

    2006-07-01

    Two species of tephritid fruit flies of economic importance, Mediterranean fruit fly (Medfly, Ceratitis capitata [Wiedemann]) and Natal fruit fly (C. rosa Karsch) cause economic losses in the South African deciduous fruit industry of approximately US$3 million per annum. A third species, marula fruit fly, C. cosyra (Walker), causes damage to citrus and sub-tropical fruits in the north-eastern part of the country. In 1999 a sterile insect technique (SIT) programme against Medfly was initiated over 10,000 ha of table grapes with a goal of cost-effective, ecologically compatible suppression of Medfly. The SIT programme was extended to two other fruit production areas in 2004. Although results in all three SIT areas have been mixed, populations of wild Medflies, as well as associated pesticide usage and control costs, have been reduced since the start of sterile fly releases. Reasons for the partial degree of success and the relatively slow expansion of Medfly SIT to other areas include economic, operational and cultural factors, as well as certain fruit production practices. Before fruit fly-free areas can be created, deficiencies in the ability to mass-rear Natal fruit fly need to be overcome so that an SIT programme against this species can be initiated. Any fruit fly suppression or eradication campaign will be severely compromised by any introductions into South Africa of exotic fruit fly species. The risk of such introductions is increasing as trade with and travel to the country increases. A Plant Health Early Warning Systems Division has been initiated to formulate fruit fly detection and action plans. Melon fly (Bactrocera cucurbitae [Coquillett]), Asian fruit fly (B. invadens Drew, Tsurutu and White) and peach fruit fly (B. zonata [Saunders]), which are all well established in parts of Africa and/or Indian Ocean islands, have been identified as presenting the highest risk for entering and becoming established in South Africa. An exotic fruit fly surveillance

  12. The South African fruit fly action plan: area-wide suppression and exotic species surveillance

    International Nuclear Information System (INIS)

    Barnes, Brian N.; Venter, Jan-Hendrik

    2006-01-01

    Two species of tephritid fruit flies of economic importance, Mediterranean fruit fly (Medfly, Ceratitis capitata [Wiedemann]) and Natal fruit fly (C. rosa Karsch) cause economic losses in the South African deciduous fruit industry of approximately US$3 million per annum. A third species, marula fruit fly, C. cosyra (Walker), causes damage to citrus and sub-tropical fruits in the north-eastern part of the country. In 1999 a sterile insect technique (SIT) programme against Medfly was initiated over 10,000 ha of table grapes with a goal of cost-effective, ecologically compatible suppression of Medfly. The SIT programme was extended to two other fruit production areas in 2004. Although results in all three SIT areas have been mixed, populations of wild Medflies, as well as associated pesticide usage and control costs, have been reduced since the start of sterile fly releases. Reasons for the partial degree of success and the relatively slow expansion of Medfly SIT to other areas include economic, operational and cultural factors, as well as certain fruit production practices. Before fruit fly-free areas can be created, deficiencies in the ability to mass-rear Natal fruit fly need to be overcome so that an SIT programme against this species can be initiated. Any fruit fly suppression or eradication campaign will be severely compromised by any introductions into South Africa of exotic fruit fly species. The risk of such introductions is increasing as trade with and travel to the country increases. A Plant Health Early Warning Systems Division has been initiated to formulate fruit fly detection and action plans. Melon fly (Bactrocera cucurbitae [Coquillett]), Asian fruit fly (B. invadens Drew, Tsurutu and White) and peach fruit fly (B. zonata [Saunders]), which are all well established in parts of Africa and/or Indian Ocean islands, have been identified as presenting the highest risk for entering and becoming established in South Africa. An exotic fruit fly surveillance

  13. Suited Contingency Ops Food - 2

    Science.gov (United States)

    Glass, J. W.; Leong, M. L.; Douglas, G. L.

    2014-01-01

    The contingency scenario for an emergency cabin depressurization event may require crewmembers to subsist in a pressurized suit for up to 144 hours. This scenario requires the capability for safe nutrition delivery through a helmet feed port against a 4 psi pressure differential to enable crewmembers to maintain strength and cognition to perform critical tasks. Two nutritional delivery prototypes were developed and analyzed for compatibility with the helmet feed port interface and for operational effectiveness against the pressure differential. The bag-in-bag (BiB) prototype, designed to equalize the suit pressure with the beverage pouch and enable a crewmember to drink normally, delivered water successfully to three different subjects in suits pressurized to 4 psi. The Boa restrainer pouch, designed to provide mechanical leverage to overcome the pressure differential, did not operate sufficiently. Guidelines were developed and compiled for contingency beverages that provide macro-nutritional requirements, a minimum one-year shelf life, and compatibility with the delivery hardware. Evaluation results and food product parameters have the potential to be used to improve future prototype designs and develop complete nutritional beverages for contingency events. These feeding capabilities would have additional use on extended surface mission EVAs, where the current in-suit drinking device may be insufficient.

  14. Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    International Nuclear Information System (INIS)

    1995-08-01

    US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure

  15. Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure.

  16. Strategic urban planning. Industrial area development in The Netherlands, to direct or to interact?

    NARCIS (Netherlands)

    de Graaf, Robin S.

    2005-01-01

    The first element in this research question is 'interaction'. It addresses the interaction in the planning process between the planning team stakeholders and between the planning team and non-planning team stakeholders.

  17. Transuranic Storage Area (TSA)-3 container storage unit RCRA closure plan

    International Nuclear Information System (INIS)

    Barry, G.A.; Lodman, D.L.; Spry, M.J.; Poor, K.J.

    1992-11-01

    This document describes the proposed plan for closure of the Transuranic Storage Area (TSA)-3 container storage unit at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. The location, size, capacity, history, and current status of the unit are described. The unit will be closed by decontaminating structures and equipment that may have contacted waste. Sufficient sampling and documentation of all activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  18. Cook Inlet Planning Area oil and gas lease sale 149: Final environmental impact statement. Volume 2

    International Nuclear Information System (INIS)

    1996-01-01

    This environmental impact statement discusses a proposed oil and gas lease sale in the Cook Inlet Planning Area, analyzes its potential effects on the environment, describes alternatives, presents major issues determined through the scoping process and staff analyses, and evaluates potential mitigating measures. During the Draft Environmental Impact Statement comment period, written statements and oral testimonies were provided by various governmental agencies, organizations, businesses, and individuals. This report contains a review and analysis of comments received on the above issues. Appendices are included which contain resource estimates and various issues relating to oil spills

  19. Beaufort Sea planning area oil and gas Lease Sale 170. Final environmental impact statement

    International Nuclear Information System (INIS)

    1998-02-01

    This environmental impact statement (EIS) assesses Lease Sale 170 proposed for August 1998 and comprised of 363 lease blocks in the Beaufort Sea planning area. The analysis addresses the significant environmental and socioeconomic concerns identified in the scoping process. Scoping consisted of input from State and Federal agencies, the petroleum industry, Native groups, environmental and public interest groups, and concerned individuals. The potential effects expected from the interaction between environmental resources and OCS-related activities were determined with respect to available scientific information and traditional knowledge. This EIS incorporates information from the Final EIS for the Beaufort Sea OCS Sale 144 (USD01, MMS, 1996a)

  20. Statement of Basis/Proposed Plan for the P-Area Burning Rubble Pit (131-P)

    International Nuclear Information System (INIS)

    Bland, T.

    2002-01-01

    The Statement of Basis/Proposed Plan (SB/PP) is being issued by the United States Department of Energy (USDOE), which functions as the lead agency for Savannah River Site (SRS) remedial activities, with concurrence by the United States Environmental Protection Agency (USEPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this SB/PP is to describe the preferred remedial alternatives for the P-Area Burning/Rubble Pit (131-P) (PBRP) Operable Unit (OU) and to provide for public involvement in the decision-making process