WorldWideScience

Sample records for antiretroviral procurement prices

  1. Factors influencing global antiretroviral procurement prices.

    Science.gov (United States)

    Wirtz, Veronika J; Forsythe, Steven; Valencia-Mendoza, Atanacio; Bautista-Arredondo, Sergio

    2009-11-18

    Antiretroviral medicines (ARVs) are one of the most costly parts of HIV/AIDS treatment. Many countries are struggling to provide universal access to ARVs for all people living with HIV and AIDS. Although substantial price reductions of ARVs have occurred, especially between 2002 and 2008, achieving sustainable access for the next several decades remains a major challenge for most low- and middle-income countries. The objectives of the present study were twofold: first, to analyze global ARV prices between 2005 and 2008 and associated factors, particularly procurement methods and key donor policies on ARV procurement efficiency; second, to discuss the options of procurement processes and policies that should be considered when implementing or reforming access to ARV programs. An ARV-medicines price-analysis was carried out using the Global Price Reporting Mechanism from the World Health Organization. For a selection of 12 ARVs, global median prices and price variation were calculated. Linear regression models for each ARV were used to identify factors that were associated with lower procurement prices. Logistic regression models were used to identify the characteristics of those countries which procure below the highest and lowest direct manufactured costs. Three key factors appear to have an influence on a country's ARV prices: (a) whether the product is generic or not; (b) the socioeconomic status of the country; (c) whether the country is a member of the Clinton HIV/AIDS Initiative. Factors which did not influence procurement below the highest direct manufactured costs were HIV prevalence, procurement volume, whether the country belongs to the least developed countries or a focus country of the United States President's Emergency Plan For AIDS Relief. One of the principal mechanisms that can help to lower prices for ARV over the next several decades is increasing procurement efficiency. Benchmarking prices could be one useful tool to achieve this.

  2. Can voluntary pooled procurement reduce the price of antiretroviral drugs? a case study of Efavirenz.

    Science.gov (United States)

    Kim, Sung Wook; Skordis-Worrall, Jolene

    2017-05-01

    : A number of strategies have aimed to assist countries in procuring antiretroviral therapy (ARV) at lower prices. In 2009, as the Global Fund to Fight AIDS, Tuberculosis and Malaria (GFATM) commenced a voluntary pooled procurement scheme, however, the impact of the scheme on ARV prices remains uncertain. This study aims to estimate the effect of VPP on drug prices using Efavirenz as a case study. This analysis uses WHO Global price report mechanism (GPRM) data from 2004 to 2013. Due to the highly skewed distribution of drug Prices, a generalized linear model (GLM) was used to conduct a difference-in-difference estimation of drug price changes over time. These analyses found that voluntary pooled procurement reduced both the ex-works price of generic Efavirenz and the incoterms price by 16.2 and 19.1%, respectively ( P <  0.001) in both cases). The year dummies were also statistically significant from 2006 to 2013 ( P <  0.001), indicating a strong decreasing trend in the price of Efavirenz over that period. Voluntary pooled procurement significantly reduced the price of 600 mg generic Efavirenz between 2009 and 2013. Voluntary pooled procurement therefore offers a potentially effective strategy for the reduction in HIV drug prices and the improvement of technical efficiency in HIV programming. Further work is required to establish if these findings hold also for other drugs. © The Author 2017. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com

  3. The pricing and procurement of antiretroviral drugs: an observational study of data from the Global Fund.

    Science.gov (United States)

    Vasan, Ashwin; Hoos, David; Mukherjee, Joia S; Farmer, Paul E; Rosenfield, Allan G; Perriëns, Joseph H

    2006-05-01

    The Purchase price report released in August 2004 by the Global Fund to Fight AIDS, Tuberculosis, and Malaria (Global Fund) was the first publication of a significant amount of real transaction purchase data for antiretrovirals (ARVs). We did an observational study of the ARV transaction data in the Purchase price report to examine the procurement behaviour of principal recipients of Global Fund grants in developing countries. We found that, with a few exceptions for specific products (e.g. lamivudine) and regions (e.g. eastern Europe), prices in low-income countries were broadly consistent or lower than the lowest differential prices quoted by the research and development sector of the pharmaceutical industry. In lower middle-income countries, prices were more varied and in several instances (lopinavir/ritonavir, didanosine, and zidovudine/lamivudine) were very high compared with the per capita income of the country. In all low- and lower middle-income countries, ARV prices were still significantly high given limited local purchasing power and economic strength, thus reaffirming the need for donor support to achieve rapid scale-up of antiretroviral therapy. However, the price of ARVs will have to decrease to render scale-up financially sustainable for donors and eventually for governments themselves. An important first step in reducing prices will be to make available in the public domain as much ARV transaction data as possible to provide a factual basis for discussions on pricing. The price of ARVs has considerable implications for the sustainability of human immunodeficiency virus/acquired immunodeficiency syndrome (HIV/AIDS) treatment in the developing world.

  4. Antiretroviral drug expenditure, pricing and judicial demand: an analysis of federal procurement data in Brazil from 2004–2011

    Science.gov (United States)

    2014-01-01

    Background Previous studies have described expenditures for antiretroviral (ARV) medicines in Brazil through 2005. While prior studies examined overall expenditures, they have not have analyzed drug procurement data in order to describe the role of court litigation on access and pricing. Methods ARV drug procurement from private sector sources for the years 2004–2011 was obtained through the general procurement database of the Brazilian Federal Government (SIASG). Procurement was measured in Defined Daily Doses (DDD) per 1000 persons-under-treatment per day. Expenditures and price per DDD were calculated and expressed in U.S. Dollars. Justifications for ARV purchases were examined in order to determine the relationship between health litigation and incorporation into Brazil’s national treatment guidelines. Results Drug procurement of ARVs from private sources underwent marked expansion in 2005, peaked in 2009, and stabilized to 2008 levels by 2011. Expenditures followed procurement curves. Medications which were procured for the first time after 2007 cost more than medicines which were introduced before 2007. Judicial actions initially resulted in purchases of newer medications for a select number of patients in Brazil but ultimately expanded availability to a larger population through incorporation into the national treatment guidelines. Conclusions Drug procurement and expenditures for ARVs in Brazil varied between 2004–2011. The procurement of some drugs from the private sector ceased after public manufacturers started producing them locally. Judicial demand has resulted in the incorporation of newer drugs into the national treatment guidelines. In order for the AIDS treatment program to remain sustainable, efforts should be pursued to reduce prices through generic drugs, price negotiation and other public health flexibilities such as compulsory licensing. PMID:24735589

  5. Price competition in procurement

    International Nuclear Information System (INIS)

    Keisler, J.M.; Buehring, W.A.

    1996-07-01

    When creating a private market to provide a public good, government agencies can influence the market's competitive characteristics. Markets have predictable, but often counterintuitive, behaviors. To succeed in applying available controls, and thereby reduce future costs, agencies must understand the behavior of the market. A model has been constructed to examine some issues in establishing competition for a structure in which there are economies of scale and government is obligated to purchase a fixed total quantity of a good. This model is used to demonstrate a way to estimate the cost savings from several alternative plans for a buyer exploring competitive procurement. The results are not and cannot be accurate for budgeting purposes; rather, they indicate the approximate magnitude of changes in cost that would be associated with changes in the market structure within which procurement occurs

  6. Antiretroviral procurement and supply chain management.

    Science.gov (United States)

    Ripin, David J; Jamieson, David; Meyers, Amy; Warty, Umesh; Dain, Mary; Khamsi, Cyril

    2014-01-01

    Procurement, the country-level process of ordering antiretrovirals (ARVs), and supply chain management, the mechanism by which they are delivered to health-care facilities, are critical processes required to move ARVs from manufacturers to patients. To provide a glimpse into the ARV procurement and supply chain, the following pages provide an overview of the primary stakeholders, principal operating models, and policies and regulations involved in ARV procurement. Also presented are key challenges that need to be addressed to ensure that the supply chain is not a barrier to the goal of universal coverage. This article will cover the steps necessary to order and distribute ARVs, including different models of delivery, key stakeholders involved, strategic considerations that vary depending on context and policies affecting them. The single drug examples given illustrate the complications inherent in fragmented supply and demand-driven models of procurement and supply chain management, and suggest tools for navigating these hurdles that will ultimately result in more secure and reliable ARV provision. Understanding the dynamics of ARV supply chain is important for the global health community, both to ensure full and efficient treatment of persons living with HIV as well as to inform the supply chain decisions for other public health products.

  7. Global strategies to reduce the price of antiretroviral medicines: evidence from transactional databases.

    Science.gov (United States)

    Waning, Brenda; Kaplan, Warren; King, Alexis C; Lawrence, Danielle A; Leufkens, Hubert G; Fox, Matthew P

    2009-07-01

    To estimate the impact of global strategies, such as pooled procurement arrangements, third-party price negotiation and differential pricing, on reducing the price of antiretrovirals (ARVs), which currently hinders universal access to HIV/AIDS treatment. We estimated the impact of global strategies to reduce ARV prices using data on 7253 procurement transactions (July 2002-October 2007) from databases hosted by WHO and the Global Fund to Fight AIDS, Tuberculosis and Malaria. For 19 of 24 ARV dosage forms, we detected no association between price and volume purchased. For the other five ARVs, high-volume purchases were 4-21% less expensive than medium- or low-volume purchases. Nine of 13 generic ARVs were priced 6-36% lower when purchased under the Clinton Foundation HIV/AIDS Initiative (CHAI). Fifteen of 18 branded ARVs were priced 23-498% higher for differentially priced purchases compared with non-CHAI generic purchases. However, two branded, differentially priced ARVs were priced 63% and 73% lower, respectively, than generic non-CHAI equivalents. Large purchase volumes did not necessarily result in lower ARV prices. Although current plans for pooled procurement will further increase purchase volumes, savings are uncertain and should be balanced against programmatic costs. Third-party negotiation by CHAI resulted in lower generic ARV prices. Generics were less expensive than differentially priced branded ARVs, except where little generic competition exists. Alternative strategies for reducing ARV prices, such as streamlining financial management systems, improving demand forecasting and removing barriers to generics, should be explored.

  8. Reserve price: Lessons learned from Brazilian electricity procurement auctions

    International Nuclear Information System (INIS)

    Rego, Erik Eduardo

    2013-01-01

    Auctions have been used in several formats in the electric energy industry. In general, regulators may be uncomfortable initiating a reverse auction at a higher-than-expected final price, fearing that participants may sell their energy at an excess profitability. Nevertheless, evidence from electricity procurement auctions conducted in Brazil supports the findings that these types of auctions have the opposite effect. By attracting a larger number of agents, these auctions can trigger stronger competition and lead to lower settlement pricing. Accordingly, the Brazilian cases examined in this article present significant evidence to support this directional theory. In fact, there are some cases of electricity procurement auctions that show that inadequate auction reserve pricing leads to inefficient outcomes and may also cause the auction to fail. On the other hand, auctions with adequate price caps have led to lower final clearing prices, thus contributing to reasonable final energy pricing. - Highlights: • Outcomes from Brazilian electricity procurement auctions were analyzed. • Cases of success and frustration after adopting (in)adequate reserve prices. • Setting different price caps per source is inefficient. • Higher-than-normal price cap is more effective than fine-tuning reserve prices

  9. Does Pharmaceutical Pricing Transparency Matter? Examining Brazil's Public Procurement System.

    Science.gov (United States)

    Kohler, Jillian Clare; Mitsakakis, Nicholas; Saadat, Faridah; Byng, Danalyn; Martinez, Martha Gabriela

    2015-08-04

    We review procurement and pricing transparency practices for pharmaceutical products. We specifically focus on Brazil and examine its approach to increasing pricing transparency, with the aim of determining the level of effectiveness in lower prices using a tool (Banco de Preços em Saúde, BPS) that only reveals purchase prices as compared to other tools (in other countries) that establish a greater degree of price transparency. A general report of Preços em Saúde (BPS) and Sistema Integrado de Administração de Serviços Gerais (SIASG) pricing data was created for 25 drugs that met specific criteria. To explore the linear time trend of each of the drugs, separate regression models were fitted for each drug, resulting in a total of 19 models. Each model controlled for the state variable and the interaction between state and time, in order to accommodate expected heterogeneity in the data. Additionally, the models controlled for procurement quantities and the effect they have on the unit price. Secondary analysis using mixed effects models was also carried out to account for the impact that institutions and suppliers may have upon the unit price. Adjusting for these predictor variables (procurement quantities, supplier, purchasing institution) was important to determine the sole effect that time has had on unit prices. A total of 2 x 19 = 38 models were estimated to explore the overall effect of time on changes in unit price. All statistical analyses were performed using the R statistical software, while the linear mixed effects models were fitted using the lme4 R package. The findings from our analysis suggest that there is no pattern of consistent price decreases within the two Brazilian states during the five-year period for which the prices were analyzed. While the BPS does allow for an increase in transparency and information on drug purchase prices in Brazil, it has not shown to lead to consistent reductions in drug purchase prices for some of the most

  10. Subcontractor procurement in construction: the interplay of price and trust

    NARCIS (Netherlands)

    Hartmann, Andreas; Caerteling, Jasper

    2010-01-01

    Purpose: The purpose of this paper is to examine the relative importance of price and trust and their interaction in subcontractor selection. By doing so, it aims to respond to the currently dominant view that trust-based procurement is the remedy to performance problems in construction. The paper

  11. Statistical Studies of Non-price Competition in the Structure of Public Procurement in the Russian Federation

    OpenAIRE

    Svetlana Aleksandrovna Sergeeva; Alexander Alexandrovich Arionchik

    2016-01-01

    The principle of securing competition is one of the basic principles of the contract system in public procurement in the Russian Federation. The law on the contract system in procurement stipulates that the contract system in procurement is aimed at creating equal conditions to ensure competition between the parties to procurement. An important aspect is that the competition for procurement should be based on compliance with the principle of fair price and non-price competition. The purpose o...

  12. THE IMPACT OF CENTRALIZATION, CORRUPTION AND INSTITUTIONAL QUALITY ON PROCUREMENT PRICES: AN APPLICATION TO PHARMACEUTICAL PURCHASING IN ITALY

    OpenAIRE

    Simona, Baldi; Davide, Vannoni

    2014-01-01

    This paper deals with the open issue about the choice between a centralized versus a decentralized public procurement strategy. Using a unique dataset on tender prices of selected drugs for hospital usage awarded by a sample of 52 Italian local health service providers (ASLs) between 2009 and 2012, we test which procurement system (centralized, decentralized or hybrid) performs better. Controlling for several covariates, we always find that centralized and hybrid procurers pay lower prices as...

  13. The impact of HTA and procurement practices on the selection and prices of medical devices.

    Science.gov (United States)

    Callea, Giuditta; Armeni, Patrizio; Marsilio, Marta; Jommi, Claudio; Tarricone, Rosanna

    2017-02-01

    Technological innovation in healthcare yields better health outcomes but also drives healthcare expenditure, and governments are struggling to maintain an appropriate balance between patient access to modern care and the economic sustainability of healthcare systems. Health Technology Assessment (HTA) and centralized procurement are increasingly used to govern the introduction and diffusion of new technologies in an effort to make access to innovation financially sustainable. However, little empirical evidence is available to determine how they affect the selection of new technologies and unit prices. This paper focuses on medical devices (MDs) and investigates the combined effect of various HTA governance models and procurement practices on the two steps of the MD purchasing process (i.e., selecting the product and setting the unit price). Our analyses are based on primary data collected through a national survey of Italian public hospitals. The Italian National Health Service is an ideal case study because it is highly decentralized and because regions have adopted different HTA governance models (i.e., regional, hospital-based, double-level or no HTA), often in combination with centralized regional procurement programs. Hence, the Italian case allows us to test the impact of different combinations of HTA models and procurement programs in the various regions. The results show that regional HTA increases the probability of purchasing the costliest devices, whereas hospital-based HTA functions more like a cost-containment unit. Centralized regional procurement does not significantly affect MD selection and is associated with a reduction in the MD unit price: on average, hospitals located in regions with centralized procurement pay 10.1% less for the same product. Hospitals located in regions with active regional HTA programs pay higher prices for the same device (+23.2% for inexpensive products), whereas hospitals that have developed internal HTA programs pay 8

  14. Pharmaceutical pricing in emerging markets: effects of income, competition, and procurement.

    Science.gov (United States)

    Danzon, Patricia M; Mulcahy, Andrew W; Towse, Adrian K

    2015-02-01

    This paper analyzes determinants of ex-manufacturer prices for originator and generic drugs across countries. We focus on drugs to treat HIV/AIDS, TB, and malaria in middle and low-income countries (MLICs), with robustness checks to other therapeutic categories and the full income range of countries. We examine the effects of per capita income, income dispersion, competition from originator and generic substitutes, and whether the drugs are sold to retail pharmacies versus tendered procurement by non-government organizations. The cross-national income elasticity of prices is 0.27 across the full income range of countries but is 0.0-0.10 between MLICs, implying that drugs are least affordable relative to income in the lowest income countries. Within-country income inequality contributes to relatively high prices in MLICs. Although generics are priced roughly 30% lower than originators on average, the variance is large. Additional generic competitors only weakly affect prices, plausibly because generic quality uncertainty leads to competition on brand rather than price. Tendered procurement that imposes quality standards attracts multinational generic suppliers and significantly reduces prices of originator and generic drugs, compared with their respective prices to retail pharmacies. © 2013 The Authors Health Economics Published by John Wiley & Sons Ltd.

  15. Study on Stochastic Optimal Electric Power Procurement Strategies with Uncertain Market Prices

    Science.gov (United States)

    Sakchai, Siripatanakulkhajorn; Saisho, Yuichi; Fujii, Yasumasa; Yamaji, Kenji

    The player in deregulated electricity markets can be categorized into three groups of GENCO (Generator Companies), TRNASCO (Transmission Companies), DISCO (Distribution Companies). This research focuses on the role of Distribution Companies, which purchase electricity from market at randomly fluctuating prices, and provide it to their customers at given fixed prices. Therefore Distribution companies have to take the risk stemming from price fluctuation of electricity instead of the customers. This entails the necessity to develop a certain method to make an optimal strategy for electricity procurement. In such a circumstance, this research has the purpose for proposing the mathematical method based on stochastic dynamic programming to evaluate the value of a long-term bilateral contract of electricity trade, and also a project of combination of the bilateral contract and power generation with their own generators for procuring electric power in deregulated market.

  16. Cost and price auditing: effectiveness in the procurement of defense services in Spain

    Directory of Open Access Journals (Sweden)

    José Aguado Romero

    Full Text Available Abstract Contract auditing, or cost and price auditing, has been applied in Spain as a means of determining prices in non-competitive defense contracts since 1989. Factors such as Spain's participation in international defense organizations, the characteristics of the defense market and the contractual legal framework for the procurement of defense goods and services help underscore the need for the Spanish Ministry of Defense to implement cost and price auditing. With the evolution of cost and price auditing in Spain in mind, this paper analyses the entire process, describes the audit procedures that are most commonly used today and assesses the main results achieved, in terms of financial savings. The results obtained show that cost and price auditing does indeed contribute to a more efficient use of public resources.

  17. Do national drug policies influence antiretroviral drug prices? Evidence from the Southern African Development community.

    Science.gov (United States)

    Liu, Yao; Galárraga, Omar

    2017-03-01

    The efficacy of low- and middle-income countries’ (LMIC) national drug policies in managing antiretroviral (ARV) pharmaceutical prices is not well understood. Though ARV drug prices have been declining in LMIC over the past decade, little research has been done on the role of their national drug policies. This study aims to (i) analyse global ARV prices from 2004 to 2013 and (ii) examine the relationship of national drug policies to ARV prices. Analysis of ARV drug prices utilized data from the Global Price Reporting Mechanism from the World Health Organization (WHO). Ten of the most common ARV drugs (first-line and second-line) were selected. National drug policies were also assessed for 12 countries in the South African Development Community (SADC), which self-reported their policies through WHO surveys. The best predictor of ARV drug price was generic status—the generic versions of 8 out of 10 ARV drugs were priced lower than branded versions. However, other factors such as transaction volume, HIV prevalence, national drug policies and PEPFAR/CHAI involvement were either not associated with ARV drug price or were not consistent predictors of price across different ARV drugs. In the context of emerging international trade agreements, which aim to strengthen patent protections internationally and potentially delay the sale of generic drugs in LMIC, this study shines a spotlight on the importance of generic drugs in controlling ARV prices. Further research is needed to understand the impact of national drug policies on ARV prices.

  18. Prices of second-line antiretroviral treatment for middle-income countries inside versus outside sub-Saharan Africa.

    Science.gov (United States)

    Simmons, Bryony; Hill, Andrew; Ford, Nathan; Ruxrungtham, Kiat; Ananworanich, Jintanat

    2014-01-01

    Antiretrovirals are available at low prices in sub-Saharan Africa, but these prices may not be consistently available for middle-income countries in other regions with large HIV epidemics. Over 30% of HIV infected people live in countries outside sub-Saharan Africa. Several key antiretrovirals are still on patent, with generic production restricted. We assessed price variations for key antiretroviral drugs inside versus outside sub-Saharan Africa. HIV drug prices used in national programmes (2010-2014) were extracted from the WHO Global Price Reporting Mechanism database for all reporting middle-income countries as classified by the World Bank. Treatment costs (branded and generic) were compared for countries inside sub-Saharan Africa versus those outside. Five key second-line antiretrovirals were analysed: abacavir, atazanavir, darunavir, lopinavir/ritonavir, raltegravir. Prices of branded antiretrovirals were significantly higher outside sub-Saharan Africa (psub-Saharan Africa versus $4689 (IQR $4075-5717) in non-African middle-income countries, an increase of 541%. However, when supplied by generic companies, most antiretrovirals were similarly priced between countries in sub-Saharan Africa and other regions. Pharmaceutical companies are selling antiretrovirals to non-African middle-income countries at prices 74-541% higher than African countries with similar gross national incomes. However, generic companies are selling most of these drugs at similar prices across regions. Mechanisms to ensure fair pricing for patented antiretrovirals across both African and non-African middle-income countries need to be improved, to ensure sustainable treatment access.

  19. Examining the production costs of antiretroviral drugs.

    Science.gov (United States)

    Pinheiro, Eloan; Vasan, Ashwin; Kim, Jim Yong; Lee, Evan; Guimier, Jean Marc; Perriens, Joseph

    2006-08-22

    To present direct manufacturing costs and price calculations of individual antiretroviral drugs, enabling those responsible for their procurement to have a better understanding of the cost structure of their production, and to indicate the prices at which these antiretroviral drugs could be offered in developing country markets. Direct manufacturing costs and factory prices for selected first and second-line antiretroviral drugs were calculated based on cost structure data from a state-owned company in Brazil. Prices for the active pharmaceutical ingredients (API) were taken from a recent survey by the World Health Organization (WHO). The calculated prices for antiretroviral drugs are compared with quoted prices offered by privately-owned, for-profit manufacturers. The API represents the largest component of direct manufacturing costs (55-99%), while other inputs, such as salaries, equipment costs, and scale of production, have a minimal impact. The calculated prices for most of the antiretroviral drugs studied fall within the lower quartile of the range of quoted prices in developing country markets. The exceptions are those drugs, primarily for second-line therapy, for which the API is either under patent, in short supply, or in limited use in developing countries (e.g. abacavir, lopinavir/ritonavir, nelfinavir, saquinavir). The availability of data on the cost of antiretroviral drug production and calculation of factory prices under a sustainable business model provide benchmarks that bulk purchasers of antiretroviral drugs could use to negotiate lower prices. While truly significant price decreases for antiretroviral drugs will depend largely on the future evolution of API prices, the present study demonstrates that for several antiretroviral drugs price reduction is currently possible. Whether or not these reductions materialize will depend on the magnitude of indirect cost and profit added by each supplier over the direct production costs. The ability to

  20. Optimal selling price and energy procurement strategies for a retailer in an electricity market

    International Nuclear Information System (INIS)

    Hatami, A.R.; Seifi, H.; Sheikh-El-Eslami, M.K.

    2009-01-01

    In an electricity market, the retailer sets up contracts with the wholesale side for purchasing electricity and with the customers for its selling. This paper proposes a mathematical method based on mixed-integer stochastic programming to determine the optimal sale price of electricity to customers and the electricity procurement policy of a retailer for a specified period. The retailer has multiple choices for electricity procurement, such as spot market, forward contracts, call options and self-production. Risk is considered and modeled by conditional value-at-risk methodology. Also, the competition between retailers is modeled using a market share function. A case study is illustrated to demonstrate the capability of the proposed method. (author)

  1. Evaluation of tendered prices of natural mineral water, juice and non-alcoholic beer (public procurement research

    Directory of Open Access Journals (Sweden)

    Nataša Pomazalová

    2011-01-01

    Full Text Available The purpose of this paper is to evaluate tender prices of chosen beverages according to public procurement based on secondary data analysis. The empirical results of analysis (t-test and F-test show that average annual prices of these beverages are different and collected data are not included in the same sample. Tender prices are different in each year of observed years, although are based on public tender. Important evidence is that for the public tenders in the abroad is obligatory use of the Czech public procurement law. According to this act the base evaluation criterion is the lowest offered price. Data were collected during the years 2005–2009. This study deals with empirical approach, variability of prices of chosen beverages based on public tenders between the Czech Republic (Ministry of Defence and local suppliers in Kosovo. Results show low variability of prices, which are based on public tender and legal approach, regulated public procurement. The research conclusion is the fact, that tender prices for piece of non-alcoholic beverage are less than 10 % from annual mean (pcs./CZK of tendered prices.

  2. Parallel imports of hospital pharmaceuticals: An empirical analysis of price effects from parallel imports and the design of procurement procedures in the Danish hospital sector

    OpenAIRE

    Hostenkamp, Gisela; Kronborg, Christian; Arendt, Jacob Nielsen

    2012-01-01

    We analyse pharmaceutical imports in the Danish hospital sector. In this market medicines are publicly tendered using first-price sealed-bid procurement auctions. We analyse whether parallel imports have an effect on pharmaceutical prices and whether the way tenders were organised matters for the competitive effect of parallel imports on prices. Our theoretical analysis shows that the design of the procurement rules affects both market structure and pharmaceutical prices. Parallel imports may...

  3. Reality check on Ontario electricity price procurement: a report from the trenches

    International Nuclear Information System (INIS)

    Rodger, J.M.; Wegiel, H.; Ferns, T.; Bystrin, A.

    2003-01-01

    The approaches taken to manage energy price risks from three different perspectives were presented. The first perspective presented was that of a law firm specializing in assisting a wide variety of clients constituting retailers and large industrial, institutional, and commercial users. The second perspective presented was that of Dofasco, the largest industrial electricity consumer in Ontario, followed by the perspective offered by Oakville Hydro, representing one of few municipally owned electricity retailers in Ontario. The first order of business, from the lawyer's viewpoint, is to identify relevant considerations for consumers and retailers, such as how do you intend to participate in the new market, what are the desired outcomes, the appetite for risk. The formulation of an approach should take the following into consideration: historical context versus new market reality, experience with electricity suppliers, and dilemma for consumers and retailers on how to level the playing field. The chosen approach was that of a request for proposals process for electricity price procurement. In the case of Dofasco, the introduction of the deregulated electricity market meant business risks, which it chose to address using an integrated risk management approach. Oakville Hydro explained its reasons for jumping into a trench: earn financial rewards and prevent brand equity erosion. Retail business must be kept simple through identifying, understanding and limiting the risks; and moving carefully but expeditiously. To mitigate the risks, it advocated getting the best legal and economics advice possible, looking for experienced partners, and not betting the shop.tabs., figs

  4. Antiretroviral purchasing and prescription practices in Mexico: constraints, challenges and opportunities

    OpenAIRE

    Chaumont, Claire; Bautista-Arredondo, Sergio; Calva, Juan José; Bahena-González, Roberto Isaac; Sánchez-Juárez, Gerda Hitz; González de Araujo-Muriel, Arturo; Magis-Rodríguez, Carlos; Hernández-Ávila, Mauricio

    2015-01-01

    Objective. This study examines the antiretroviral (ARV) market characteristics for drugs procured and prescribed to Mexico's Social Protection System in Health beneficiaries between 2008 and 2013, and compares them with international data. Materials and methods. Procurement information from the National Center for the Prevention and the Control of HIV/AIDS was analyzed to estimate volumes and prices of key ARV. Annual costs were compared with data from the World Health Organization's Global P...

  5. Prices paid for adult and paediatric antiretroviral treatment by low- and middle-income countries in 2012: high, low or just right?

    Science.gov (United States)

    Perriëns, Joseph H; Habiyambere, Vincent; Dongmo-Nguimfack, Boniface; Hirnschall, Gottfried

    2014-01-01

    A viable market for antiretroviral drugs in low- and middle-income countries is key to the continued scale-up of antiretroviral treatment. We describe the price paid by low- and middle-income countries for 10 first- and 7 second-line adult and paediatric treatment regimens from 2003 to 2012, and compare the price of their finished formulations with the price of their active pharmaceutical ingredients in 2005, 2007, 2010 and 2012. Between 2003 and 2012 the median price of adult first-line treatment regimens per treatment-year decreased from USD499 to USD122, and that of second-line regimens from USD2,934 to USD497. In 2005 adult formulations were sold for a price 170% higher than the cost of their active pharmaceutical ingredients. This margin had decreased to 28% in 2012. Between 2004 and 2013, the price of paediatric treatment per treatment-year decreased from USD585 to USD147 for first-line and from USD763 to USD288 for second-line treatment. In 2005, paediatric treatment regimens were sold at a price 231% higher than the cost of their active pharmaceutical ingredients. This margin remained high and was 195% in 2012. The prices paid for antiretroviral drugs by low- and middle-income countries decreased between 2003 and 2012. Although the margins on their sale decreased, there is likely still space for price reduction, especially for the more recent World Health Organization recommended adult first-line regimens and for paediatric treatment.

  6. Price-Based Acquisition. Issues and Challenges for Defense Department Procurement of Weapon Systems

    Science.gov (United States)

    2005-01-01

    requirement for cost or pricing data on proposals—even including the requirement for full TINA certifica- tion—were tepid at best.10 Yet another area of...sition University’s Acquisition Community Connection Web site (http://acc.dau.mil/ simplify/ev.php?ID=5944_201&ID2=DO_TOPIC): “Alpha Acquisition is a...as DoD’s increas- ingly broad and lax application of its statutory authority to grant TINA waivers. Critics argued that DoD was granting too many

  7. Does the Lowest Bid Price Evaluation Criterion Make for a More Efficient Public Procurement Selection Criterion? (Case of the Czech Republic

    Directory of Open Access Journals (Sweden)

    Ochrana František

    2015-06-01

    Full Text Available Through the institute of public procurement a considerable volume of financial resources is allocated. It is therefore in the interest of contracting entities to seek ways of how to achieve an efficient allocation of resources. Some public contract-awarding entities, along with some public-administration authorities in the Czech Republic, believe that the use of a single evaluation criterion (the lowest bid price results in a more efficient tender for a public contract. It was found that contracting entities in the Czech Republic strongly prefer to use the lowest bid price criterion. Within the examined sample, 86.5 % of public procurements were evaluated this way. The analysis of the examined sample of public contracts proved that the choice of an evaluation criterion, even the preference of the lowest bid price criterion, does not have any obvious impact on the final cost of a public contract. The study concludes that it is inappropriate to prefer the criterion of the lowest bid price within the evaluation of public contracts that are characterised by their complexity (including public contracts for construction works and public service contracts. The findings of the Supreme Audit Office related to the inspection of public contracts indicate that when using the lowest bid price as an evaluation criterion, a public contract may indeed be tendered with the lowest bid price, but not necessarily the best offer in terms of supplied quality. It is therefore not appropriate to use the lowest bid price evaluation criterion to such an extent for the purpose of evaluating work and services. Any improvement to this situation requires a corresponding amendment to the Law on Public Contracts and mainly a radical change in the attitude of the Office for the Protection of Competition towards proposed changes, as indicated within the conclusions and recommendations proposed by this study.

  8. Procurement with Specialized Firms

    NARCIS (Netherlands)

    Boone, J.; Schottmuller, C.

    2011-01-01

    This paper analyzes optimal procurement mechanisms in a setting where the procurement agency has incomplete information concerning the firms’ cost functions and cares about quality as well as price. Low type firms are cheaper than high type firms in providing low quality but more expensive when

  9. Procurement with specialized firms

    NARCIS (Netherlands)

    Boone, Jan; Schottmuller, C.

    2016-01-01

    We analyze optimal procurement mechanisms when firms are specialized. The procurement agency has incomplete information concerning the firms' cost functions and values high quality as well as low price. Lower type firms are cheaper (more expensive) than higher type firms when providing low (high)

  10. Defense Contract Audit Agency Reviews of Price Proposals

    National Research Council Canada - National Science Library

    1998-01-01

    .... Auditors perform field pricing reviews of contractor price proposals when procurement office information is insufficient to perform the cost or price analysis needed to negotiate contract prices...

  11. Conflicts in Public Procurement

    Directory of Open Access Journals (Sweden)

    Helena Lindskog

    2013-01-01

    Full Text Available During the last couple of years, there has been a tendency to include more and more political goals into public procurements, such as environmental and societal considerations. This can result in higher prices paid by the public sector compared with similar procurements in the private sector. The decision makers at local level are elected and should represent the interest of their communities and voters, which includes promoting regional/local companies and economic development. This task can sometimes get into conflict with public procurement law or the political goals of a central government. (original abstract

  12. Antiretroviral purchasing and prescription practices in Mexico: constraints, challenges and opportunities.

    Science.gov (United States)

    Chaumont, Claire; Bautista-Arredondo, Sergio; Calva, Juan José; Bahena-González, Roberto Isaac; Sánchez-Juárez, Gerda Hitz; González de Araujo-Muriel, Arturo; Magis-Rodríguez, Carlos; Hernández-Ávila, Mauricio

    2015-01-01

    This study examines the antiretroviral (ARV) market characteristics for drugs procured and prescribed to Mexico's Social Protection System in Health beneficiaries between 2008 and 2013, and compares them with international data. Procurement information from the National Center for the Prevention and the Control of HIV/AIDS was analyzed to estimate volumes and prices of key ARV. Annual costs were compared with data from the World Health Organization's Global Price Reporting Mechanism for similar countries. Finally, regimens reported in the ARV Drug Management, Logistics and Surveillance System database were reviewed to identify prescription trends and model ARV expenditures until 2018. Results show that the first-line ARV market is concentrated among a small number of patented treatments, in which prescription is clinically adequate, but which prices are higher than those paid by similar countries. The current set of legal and structural options available to policy makers to bring prices down is extremely limited. Different negotiation policies were not successful to decrease ARV high prices in the public health market. The closed list approach had a good impact on prescription quality but was ineffective in reducing prices. The Coordinating Commission for Negotiating the Price of Medicines and other Health Supplies also failed to obtain adequate prices. To maximize purchase efficiency, policy makers should focus on finding long-term legal and political safeguards to counter the high prices imposed by pharmaceutical companies.

  13. Public Procurement of Innovation Policy

    DEFF Research Database (Denmark)

    Rolfstam, Max; Petersen, Ole Helby

    2014-01-01

    Until recently, Danish policy interest in public procurement has mainly been driven by efficiency and cost-effectiveness concerns. Public-procurement policies have in general focused on the utilisation of economies of scale as a Means of achieving lower prices on goods and services. Attempts...... to develop mandatory procurement systems have also been gradually developing, while the focus on innovation has been relatively modest in Danish procurement policies until recently. This picture is currently changing, as several initiatives emphasising public procurement as a means of stimulating innovation...... have been launched. Whether this gradual change of focus in Danish procurement policies will make a deep and lasting impact on the role of public procurement as a driver for innovationis, however, yet an open question....

  14. Interactivity of marketing and procurement

    Directory of Open Access Journals (Sweden)

    Lazarević Dragan

    2007-01-01

    Full Text Available General conclusions regarding the close links between marketing and procurement side of the marketing process would be expressed as follows: Interactive link between marketing and procurement is just proportionate to a level of company's market orientation. Establishment of an interactive link between marketing and procurement fields would reflect on pricing. Besides price competition, establishment of an integral approach through comprehensive understanding of market relations, will set up conditions for company to meet customers' needs in the most optimal way. Therefore the total result will be advanced and a company with this kind of orientation can become a market leader.

  15. Data feature: Fuel procurement

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This document is a review of the effect of fuel costs on the procurement strategies of a utility and a conjecture that the same strategies may have an effect on the price of fuel. Factors affecting fuel costs are reviewed, and a number of procurement strategies taken to trim fuel costs are reviewed. The major trend is away from long-term enrichment contracts and into such strategies as: (1) Spot market purchases, (2) Inventory reduction, (3) Purchase of CIS material, and (4) Market-related contracts instead of base-escalated contracts

  16. Price

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The price terms in wheeling contracts very substantially, reflecting the differing conditions affecting the parties contracting for the service. These terms differ in the manner in which rates are calculated, the formulas used, and the philosophy underlying the accord. For example, and EEI study found that firm wheeling rates ranged from 20 cents to $1.612 per kilowatt per month. Nonfirm rates ranged from .15 mills to 5.25 mills per kilowatt-hour. The focus in this chapter is on cost-based rates, reflecting the fact that the vast majority of existing contracts are based on rate designs reflecting embedded costs. This situation may change in the future, but, for now, this fact can't be ignored

  17. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    evolves from a simple establishment of a contractual relationship to a central and strategic part of construction. The authors relate to cultural, ethical and social and behavioural sciences as the fundamental basis for analysis and understanding of the complexity and dynamics of the procurement system......‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which...

  18. 29 CFR 95.45 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Cost and price analysis. 95.45 Section 95.45 Labor Office of... Procurement Standards § 95.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...

  19. 49 CFR 19.45 - Cost and price analysis.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Cost and price analysis. 19.45 Section 19.45... Requirements Procurement Standards § 19.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price...

  20. Measuring the effect of Sustainable Public Procurement

    NARCIS (Netherlands)

    Zijp MC; Kok L; Valk E de; DMG; M&V; M&V

    2018-01-01

    Many purchasing services of the Dutch local and central governments, aim to include the effects of products and services on human health and the environment in the procurement process. Sustainable procurement (SP) encompasses more than just price and quality considerations. SP can result, for

  1. 40 CFR 30.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... competition when competitive bids or offers are not obtained; and basis for award cost or price. ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 30.46...

  2. 14 CFR 1260.146 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260.146... of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  3. 32 CFR 32.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 32.46... for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  4. 36 CFR 1210.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards...) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  5. 22 CFR 145.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... for lack of competition when competitive bids or offers are not obtained, and (c) basis for award cost or price. ...

  6. 2 CFR 215.46 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... NON-PROFIT ORGANIZATIONS (OMB CIRCULAR A-110) Post Award Requirements Procurement Standards § 215.46... of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  7. 24 CFR 84.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  8. 7 CFR 3019.46 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ...) Justification for lack of competition bids or offers are not obtained, and (c) Basis for award cost or price. ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement...

  9. Assessment of procurement methods used for executing ...

    African Journals Online (AJOL)

    Assessment of procurement methods used for executing maintenance works in Lagos state. ... Ethiopian Journal of Environmental Studies and Management ... Others are risk allocation, price competition and flexibility of contract. Finally, better ...

  10. Utility procurement policies in the USA

    International Nuclear Information System (INIS)

    Lurf, G.; Nikazmerad, N.M.

    1983-01-01

    The subject is discussed under the headings: introduction; market history (historical uranium demand and production in the USA); recent long-term contract activity (expected US reactor demand and uranium production; expected US reactor demand and contracted uranium supplies); utility procurement attitudes; impact of inventories on procurement; current regulatory environment (spot-market price vs average long-term contract price); embargo and imports; conclusion. (U.K.)

  11. Modeling HIV/AIDS drug price determinants in Brazil: is generic competition a myth?

    Science.gov (United States)

    Meiners, Constance; Sagaon-Teyssier, Luis; Hasenclever, Lia; Moatti, Jean-Paul

    2011-01-01

    Brazil became the first developing country to guarantee free and universal access to HIV/AIDS treatment, with antiretroviral drugs (ARVs) being delivered to nearly 190,000 patients. The analysis of ARV price evolution and market dynamics in Brazil can help anticipate issues soon to afflict other developing countries, as the 2010 revision of the World Health Organization guidelines shifts demand towards more expensive treatments, and, at the same time, current evolution of international legislation and trade agreements on intellectual property rights may reduce availability of generic drugs for HIV care. Our analyses are based on effective prices paid for ARV procurement in Brazil between 1996 and 2009. Data panel structure was exploited to gather ex-ante and ex-post information and address various sources of statistical bias. In-difference estimation offered in-depth information on ARV market characteristics which significantly influence prices. Although overall ARV prices follow a declining trend, changing characteristics in the generic segment help explain recent increase in generic ARV prices. Our results show that generic suppliers are more likely to respond to factors influencing demand size and market competition, while originator suppliers tend to set prices strategically to offset compulsory licensing threats and generic competition. In order to guarantee the long term sustainability of access to antiretroviral treatment, our findings highlight the importance of preserving and stimulating generic market dynamics to sustain developing countries' bargaining power in price negotiations undertaken with originator companies.

  12. Modeling HIV/AIDS drug price determinants in Brazil: is generic competition a myth?

    Directory of Open Access Journals (Sweden)

    Constance Meiners

    Full Text Available BACKGROUND: Brazil became the first developing country to guarantee free and universal access to HIV/AIDS treatment, with antiretroviral drugs (ARVs being delivered to nearly 190,000 patients. The analysis of ARV price evolution and market dynamics in Brazil can help anticipate issues soon to afflict other developing countries, as the 2010 revision of the World Health Organization guidelines shifts demand towards more expensive treatments, and, at the same time, current evolution of international legislation and trade agreements on intellectual property rights may reduce availability of generic drugs for HIV care. METHODS AND FINDINGS: Our analyses are based on effective prices paid for ARV procurement in Brazil between 1996 and 2009. Data panel structure was exploited to gather ex-ante and ex-post information and address various sources of statistical bias. In-difference estimation offered in-depth information on ARV market characteristics which significantly influence prices. Although overall ARV prices follow a declining trend, changing characteristics in the generic segment help explain recent increase in generic ARV prices. Our results show that generic suppliers are more likely to respond to factors influencing demand size and market competition, while originator suppliers tend to set prices strategically to offset compulsory licensing threats and generic competition. SIGNIFICANCE: In order to guarantee the long term sustainability of access to antiretroviral treatment, our findings highlight the importance of preserving and stimulating generic market dynamics to sustain developing countries' bargaining power in price negotiations undertaken with originator companies.

  13. Sustainable Procurement

    DEFF Research Database (Denmark)

    Telles, Pedro; Ølykke, Grith Skovgaard

    2017-01-01

    and within it how sustainable requirements have increased the level of compliance required, particularly regulatory compliance. Compliance was already present in previous EU public procurement frameworks, but its extent on Directive 2014/24/EU leads the authors to consider the current legal framework...

  14. Procurement Options for New Renewable Electricity Supply

    Energy Technology Data Exchange (ETDEWEB)

    Kreycik, C. E.; Couture, T. D.; Cory, K. S.

    2011-12-01

    State renewable portfolio standard (RPS) policies require utilities and load-serving entities (LSEs) to procure renewable energy generation. Utility procurement options may be a function of state policy and regulatory preferences, and in some cases, may be dictated by legislative authority. Utilities and LSEs commonly use competitive solicitations or bilateral contracting to procure renewable energy supply to meet RPS mandates. However, policymakers and regulators in several states are beginning to explore the use of alternatives, namely feed-in tariffs (FITs) and auctions to procure renewable energy supply. This report evaluates four procurement strategies (competitive solicitations, bilateral contracting, FITs, and auctions) against four main criteria: (1) pricing; (2) complexity and efficiency of the procurement process; (3) impacts on developers access to markets; and (4) ability to complement utility decision-making processes. These criteria were chosen because they take into account the perspective of each group of stakeholders: ratepayers, regulators, utilities, investors, and developers.

  15. A procurement decision support mechanism on multi-attribute fuzzy-interval auctions

    DEFF Research Database (Denmark)

    Franco de los Ríos, Camilo; Hougaard, Jens Leth; Nielsen, Kurt

    2016-01-01

    Procurement systems are the basis for assuring efficiency and fairness in organizations. Consequently, the development of procurement systems faces an ongoing challenge in designing trading systems that facilitate transparent competition on both price and multiple attributes, as well as ensuring...

  16. 40 CFR 30.45 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Cost and price analysis. 30.45 Section... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...

  17. 38 CFR 49.45 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Cost and price analysis... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...

  18. 14 CFR 1260.145 - Cost and price analysis.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Cost and price analysis. 1260.145 Section... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...

  19. 32 CFR 32.45 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Cost and price analysis. 32.45 Section 32.45... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...

  20. 43 CFR 12.945 - Cost and price analysis.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Cost and price analysis. 12.945 Section 12... Requirements § 12.945 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...

  1. 24 CFR 84.45 - Cost and price analysis.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Cost and price analysis. 84.45....45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various...

  2. 41 CFR 105-72.505 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Cost and price analysis... § 105-72.505 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...

  3. 22 CFR 145.45 - Cost and price analysis.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Cost and price analysis. 145.45 Section 145.45....45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various...

  4. Supply Chain Shipment Pricing Data

    Data.gov (United States)

    US Agency for International Development — This data set provides supply chain health commodity shipment and pricing data. Specifically, the data set identifies Antiretroviral (ARV) and HIV lab shipments to...

  5. 41 CFR 105-72.506 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards...) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  6. Access to hepatitis C virus treatment: Lessons from implementation of strategies for increasing access to antiretroviral treatment

    Directory of Open Access Journals (Sweden)

    Yibeltal Assefa

    2018-05-01

    Full Text Available At September’s 2017 United Nations General Assembly, a state-of-the-art HIV medicine was announced to be made available at just $75 per person per year. There have been a number of strategies that the global AIDS community and countries have utilized to reduce prices and make antiretrovirals (ARVs accessible for people living with HIV/AIDS. There appears to be an opportunity for the treatment of hepatitis C virus infection using direct-acting antivirals (DAAs to benefit from the often painful and laboured history of driving down the prices of ARVs. In general, the success of lowering prices for ARVs has stemmed from the politics needed to initially support generic entry into the on-patent market. The use of flexibilities present in the World Trade Organization’s Agreement on Trade-Related Aspects of Intellectual Property Rights (TRIPS have been used to overcome patent barriers, with the use of compulsory licenses and/or the threat of their use as instruments for strengthening the bargaining power in price negotiations.These strategies have been combined with new financing mechanisms that have promoted more effective procurement and price negotiations. Partnership among the different stakeholders has also been critical in this regard. Countries have also invested in their health systems and implemented several strategies to reduce stigma and discrimination to increase access to and improve utilization of ARVs. This article suggests that any future international initiatives to increase access to DAAs can learn from these lessons surrounding price reduction, improved financing, advocacy, as well as health systems strengthening and stigma reduction. Adopting and reconfiguring these strategies will also incur substantial savings in time, money and lives. Keywords: Acces to medicines, Hepatitis C virus, HIV, Antiretrovirals, Direct-acting antivirals

  7. 15 CFR 14.45 - Cost and price analysis.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Cost and price analysis. 14.45 Section... COMMERCIAL ORGANIZATIONS Post-Award Requirements Procurement Standards § 14.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with...

  8. 14 CFR 1274.506 - Cost and price analysis.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Cost and price analysis. 1274.506 Section... WITH COMMERCIAL FIRMS Procurement Standards § 1274.506 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every...

  9. 45 CFR 74.45 - Cost and price analysis.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Cost and price analysis. 74.45 Section 74.45... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Procurement Standards § 74.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in...

  10. 28 CFR 70.45 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Cost and price analysis. 70.45 Section 70... NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 70.45 Cost and price analysis. Some form of cost or price analysis must be made and documented in the procurement files in connection...

  11. 20 CFR 627.420 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... sources, unless it is demonstrated that the JTPA-funded alternative services or facilities would be more...) Each State and subrecipient shall conduct procurements in a manner which provides full and open... pricing practices between firms or organizations or between affiliated companies or organizations; (iv...

  12. 38 CFR 49.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 49.46... of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. (Authority: Pub. L. 104-156; 110 Stat. 1396) ...

  13. 36 CFR 1207.36 - Procurement.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Procurement. 1207.36 Section 1207.36 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... resonableness can be established on the basis of a catalog or market price of a commercial product sold in...

  14. Procurement Tracking System (PTS)

    Data.gov (United States)

    Office of Personnel Management — The Procurement Tracking System (PTS) is used solely by the procurement staff of the Office of the Inspector General (OIG) at the U.S. Office of Personnel Management...

  15. Discriminatory public procurement policies

    NARCIS (Netherlands)

    Ssennoga, Francis

    2010-01-01

    To achieve social economic objectives, governments usually institute discriminatory practices in their country’s public procurement framework. Discriminatory procurement is the practice by governments to favour their own domestic suppliers over foreign firms for advertised contracts. Favouring

  16. Public procurement process

    African Journals Online (AJOL)

    NESG Policy Brief: April 2017. Public ... transparency in public procurement; and greater concerns about efficiency, fairness, and equity. ... government enacted the Public Procurement Act (2007) [1] which provides legislative framework for.

  17. Procurement Career Management Handbook.

    Science.gov (United States)

    Department of the Treasury, Washington, DC.

    This handbook is the result of the Treasury Department's efforts to increase professionalism among its procurement employees nationwide through its Procurement Career Management Program. First, the scope and objectives of the Procurement Career Management Program are discussed. The remaining sections of the handbook deal with the following program…

  18. Providing insecticide treated bed nets in antiretroviral treatment ...

    African Journals Online (AJOL)

    HIV-replication.5-13 Mathematical models show that repeated ... antiretroviral treatment clinics in Malawi: a pilot ... related disease or AIDS.3 In addition, there are between 300 - ... and growing evidence of interactive pathology.1,2. HIV ..... by the HIV Unit and its partners. ... procurement and supply chain systems developed.

  19. Differences and similarities on the approaches of buyers from X and Y generations regarding sustainable procurement

    OpenAIRE

    Lacour, Maxime

    2016-01-01

    Responsible procurement has become a real challenge for companies following the current trends of Corporate Social Responsibility (CSR) and more and more ethic-oriented customers. Differing from the concept of green procurement this concept of responsible procurement supports the willingness of companies to have ethic and sustainable supplies. The usual criteria in procurement such as price performances innovation terms and time of payment have increasingly been coupled with more ethic-orient...

  20. Energy price risk management

    International Nuclear Information System (INIS)

    Evans, J.W.G.

    1998-01-01

    While long term, fixed price contracts for fuel procurement and export of excess power may lock in the economics of a CHP plant, these do not necessarily give the best pricing opportunities that may exist during the life of those contracts. A more prudent approach may be to vary the length of the contracts and markets are now developing in gas and electricity to assist in the management of such a portfolio. (Author)

  1. Long-term costs and health impact of continued global fund support for antiretroviral therapy.

    Directory of Open Access Journals (Sweden)

    John Stover

    Full Text Available BACKGROUND: By the end of 2011 Global Fund investments will be supporting 3.5 million people on antiretroviral therapy (ART in 104 low- and middle-income countries. We estimated the cost and health impact of continuing treatment for these patients through 2020. METHODS AND FINDINGS: Survival on first-line and second-line ART regimens is estimated based on annual retention rates reported by national AIDS programs. Costs per patient-year were calculated from country-reported ARV procurement prices, and expenditures on laboratory tests, health care utilization and end-of-life care from in-depth costing studies. Of the 3.5 million ART patients in 2011, 2.3 million will still need treatment in 2020. The annual cost of maintaining ART falls from $1.9 billion in 2011 to $1.7 billion in 2020, as a result of a declining number of surviving patients partially offset by increasing costs as more patients migrate to second-line therapy. The Global Fund is expected to continue being a major contributor to meeting this financial need, alongside other international funders and domestic resources. Costs would be $150 million less in 2020 with an annual 5% decline in first-line ARV prices and $150-370 million less with a 5%-12% annual decline in second-line prices, but $200 million higher in 2020 with phase out of stavudine (d4T, or $200 million higher with increased migration to second-line regimens expected if all countries routinely adopted viral load monitoring. Deaths postponed by ART correspond to 830,000 life-years saved in 2011, increasing to around 2.3 million life-years every year between 2015 and 2020. CONCLUSIONS: Annual patient-level direct costs of supporting a patient cohort remain fairly stable over 2011-2020, if current antiretroviral prices and delivery costs are maintained. Second-line antiretroviral prices are a major cost driver, underscoring the importance of investing in treatment quality to improve retention on first-line regimens.

  2. Affordability of adult HIV/AIDS treatment in developing countries: modelling price determinants for a better insight of the market functioning.

    Science.gov (United States)

    Sagaon-Teyssier, Luis; Singh, Sauman; Dongmo-Nguimfack, Boniface; Moatti, Jean-Paul

    2016-01-01

    This study aims to provide a landscape of the global antiretroviral (ARV) market by analyzing the transactional data on donor-funded ARV procurement between 2003 and 2015, and the ARV price determinants. The data were obtained from the Global Price Reporting Mechanism (GPRM) managed by the AIDS Medicines and Diagnostics Service of the WHO, and it consists of information that covers approximately 80% of the total donor-funded adult ARV transactions procurement. ExWorks prices and procured quantities were standardized according to the guidelines in terms of yearly doses. Descriptive statistics on quantities and prices show the main trends of the ARV market. Ordinary least squares estimation was carried out for the whole sample, then stratified according to the type of supplier (originator and generic) and controlled for time and geographical fixed-effects. Given that analyses were carried out on a public dataset on ARV transactional prices from the GPRM, ethics are respected and consent was not necessary. Originator medicines are on average the least expensive in the sub-Saharan Africa region, where at the same time, generic medicines are on average the most expensive. By contrast, originator medicines are the most expensive in Europe and Central Asia, and generic medicines are the least expensive. In fact, the data suggest mixed strategies by ARV suppliers to exploit opportunities for profit maximization and to adapt to the specific conditions of market competition in each region. Our results also suggest that the expiration of patents is not sufficient to boost additional developments in generic competition (at least in the ARV market) and that formal or informal agreements between generic firms may de facto slow down or even reverse long-term trends towards price decreases. Our findings provide an improved understanding of the ARV market that can help countries strengthen policy measures to increase their bargaining power in price negotiations and the use of TRIPS

  3. PRICE AND PRICING STRATEGIES

    OpenAIRE

    SUCIU Titus

    2013-01-01

    In individual companies, price is one significant factor in achieving marketing success. In many purchase situations, price can be of great importance to customers. Marketers must establish pricing strategies that are compatible with the rest of the marketing mix. Management should decide whether to charge the same price to all similar buyers of identical quantities of a product (a one-price strategy) or to set different prices (a flexible price strategy). Many organizations, especially retai...

  4. Evolution of antiretroviral drug costs in Brazil in the context of free and universal access to AIDS treatment.

    Science.gov (United States)

    Nunn, Amy S; Fonseca, Elize M; Bastos, Francisco I; Gruskin, Sofia; Salomon, Joshua A

    2007-11-13

    Little is known about the long-term drug costs associated with treating AIDS in developing countries. Brazil's AIDS treatment program has been cited widely as the developing world's largest and most successful AIDS treatment program. The program guarantees free access to highly active antiretroviral therapy (HAART) for all people living with HIV/AIDS in need of treatment. Brazil produces non-patented generic antiretroviral drugs (ARVs), procures many patented ARVs with negotiated price reductions, and recently issued a compulsory license to import one patented ARV. In this study, we investigate the drivers of recent ARV cost trends in Brazil through analysis of drug-specific prices and expenditures between 2001 and 2005. We compared Brazil's ARV prices to those in other low- and middle-income countries. We analyzed trends in drug expenditures for HAART in Brazil from 2001 to 2005 on the basis of cost data disaggregated by each ARV purchased by the Brazilian program. We decomposed the overall changes in expenditures to compare the relative impacts of changes in drug prices and drug purchase quantities. We also estimated the excess costs attributable to the difference between prices for generics in Brazil and the lowest global prices for these drugs. Finally, we estimated the savings attributable to Brazil's reduced prices for patented drugs. Negotiated drug prices in Brazil are lowest for patented ARVs for which generic competition is emerging. In recent years, the prices for efavirenz and lopinavir-ritonavir (lopinavir/r) have been lower in Brazil than in other middle-income countries. In contrast, the price of tenofovir is US$200 higher per patient per year than that reported in other middle-income countries. Despite precipitous price declines for four patented ARVs, total Brazilian drug expenditures doubled, to reach US$414 million in 2005. We find that the major driver of cost increases was increased purchase quantities of six specific drugs: patented lopinavir

  5. Evolution of antiretroviral drug costs in Brazil in the context of free and universal access to AIDS treatment.

    Directory of Open Access Journals (Sweden)

    Amy S Nunn

    2007-11-01

    Full Text Available Little is known about the long-term drug costs associated with treating AIDS in developing countries. Brazil's AIDS treatment program has been cited widely as the developing world's largest and most successful AIDS treatment program. The program guarantees free access to highly active antiretroviral therapy (HAART for all people living with HIV/AIDS in need of treatment. Brazil produces non-patented generic antiretroviral drugs (ARVs, procures many patented ARVs with negotiated price reductions, and recently issued a compulsory license to import one patented ARV. In this study, we investigate the drivers of recent ARV cost trends in Brazil through analysis of drug-specific prices and expenditures between 2001 and 2005.We compared Brazil's ARV prices to those in other low- and middle-income countries. We analyzed trends in drug expenditures for HAART in Brazil from 2001 to 2005 on the basis of cost data disaggregated by each ARV purchased by the Brazilian program. We decomposed the overall changes in expenditures to compare the relative impacts of changes in drug prices and drug purchase quantities. We also estimated the excess costs attributable to the difference between prices for generics in Brazil and the lowest global prices for these drugs. Finally, we estimated the savings attributable to Brazil's reduced prices for patented drugs. Negotiated drug prices in Brazil are lowest for patented ARVs for which generic competition is emerging. In recent years, the prices for efavirenz and lopinavir-ritonavir (lopinavir/r have been lower in Brazil than in other middle-income countries. In contrast, the price of tenofovir is US$200 higher per patient per year than that reported in other middle-income countries. Despite precipitous price declines for four patented ARVs, total Brazilian drug expenditures doubled, to reach US$414 million in 2005. We find that the major driver of cost increases was increased purchase quantities of six specific drugs

  6. Prices and Price Setting

    NARCIS (Netherlands)

    R.P. Faber (Riemer)

    2010-01-01

    textabstractThis thesis studies price data and tries to unravel the underlying economic processes of why firms have chosen these prices. It focuses on three aspects of price setting. First, it studies whether the existence of a suggested price has a coordinating effect on the prices of firms.

  7. Indonesia - Procurement Modernization

    Data.gov (United States)

    Millennium Challenge Corporation — The evaluation seeks to establish evidence on the possible effects of an intervention designed to modernize public procurement: effects on cost savings, performance...

  8. Public Procurement and Innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    be understood as a special case of innovation, where social processes – and consequently the institutions governing these social processes – need to be considered. This book contributes to our understanding with a detailed institutional analysis of the public procurement of innovation.......Max Rolfstam examines the increasing emphasis on public procurement as a means to stimulate innovation and the theoretical implications of this policy development. While ‘regular’ public procurement may be regarded as the outcome of anonymous market processes, public procurement of innovation must...

  9. Organ procurement: Spanish transplant procurement management.

    Science.gov (United States)

    Manyalich, Martí; Mestres, Carlos A; Ballesté, Chloë; Páez, Gloria; Valero, Ricard; Gómez, María Paula

    2011-06-01

    Transplantation is an accepted therapeutic option to save or improve the quality of life when organ failure occurs or tissue replacements are needed. However, the lack of organs is the major limitation. The deceased organ procurement organization and professionals provide the solution to this international problem. In this review, we identify the elements involved in the organ procurement management process to analyze the possibility of implementation of deceased organ procurement for a transplantation program. While the donation rates are subject to several negative factors including religious, economic, cultural, and legal issues, the existence of well-trained professionals may considerably increase them. Professional training in organ donation along with the establishment of a solid organizational system has been identified as the crucial factor in developing efficient organ donation and transplantation programs.

  10. IEA Task 24 Solar procurement 2000

    Energy Technology Data Exchange (ETDEWEB)

    Ellehauge, K.; Oestergaard, I. [Teknologisk Institut, Taastrup. SolEnergiCentret (Denmark); Gramkow, L. [Esbensen, Copenhagen (Denmark)

    2002-04-01

    The objective of the project is to develop and improve large procurements of solar heating systems in order to be able to place large orders with manufacturers and suppliers. The project work will be carried out as an international co-operation under IEA Task 24 with the title 'Solar Procurement'. By co-ordinating the effort between the 4-6 participating countries, the objective is to purchase at least 10,000 solar heating systems, of this amount 1,000-2,000 in Denmark. Such large orders make it possible for manufacturers and suppliers to deliver systems considerably cheaper, and it will be possible to develop systems for given specifications on output and efficiency. These co-ordinated large orders are expected to improve the price/efficiency conditions by up to 50%. The so called 'procurement process' (co-ordinated international procurement based on goal-oriented system development in co-operation between customers and suppliers/manufacturers) will in the project be followed up by information/marketing, education, financing schemes, service schemes, quality assurance and technical support. The project is divided into two main areas (IEA subtasks). 1: 'Procurement and Marketing' and 2: 'Creation of Tools'. Denmark has been requested to be the project manager of subtask 2, 'Creation of Tools'. (EHS)

  11. IEA Task 24 Solar procurement 2000

    International Nuclear Information System (INIS)

    Ellehauge, K.; Oestergaard, I.; Gramkow, L.

    2002-04-01

    The objective of the project is to develop and improve large procurements of solar heating systems in order to be able to place large orders with manufacturers and suppliers. The project work will be carried out as an international co-operation under IEA Task 24 with the title 'Solar Procurement'. By co-ordinating the effort between the 4-6 participating countries, the objective is to purchase at least 10,000 solar heating systems, of this amount 1,000-2,000 in Denmark. Such large orders make it possible for manufacturers and suppliers to deliver systems considerably cheaper, and it will be possible to develop systems for given specifications on output and efficiency. These co-ordinated large orders are expected to improve the price/efficiency conditions by up to 50%. The so called 'procurement process' (co-ordinated international procurement based on goal-oriented system development in co-operation between customers and suppliers/manufacturers) will in the project be followed up by information/marketing, education, financing schemes, service schemes, quality assurance and technical support. The project is divided into two main areas (IEA subtasks). 1: 'Procurement and Marketing' and 2: 'Creation of Tools'. Denmark has been requested to be the project manager of subtask 2, 'Creation of Tools'. (EHS)

  12. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laiho, Aki; Laine, Jari

    Procurement has to find further levers and advance its contribution to corporate goals continuously. This places pressure on its organization in order to facilitate its performance. Therefore, Procurement organizations constantly have to evolve in order to match these demands. A conceptual model...... is presented and results of a first case study discussed. The findings highlight the importance of taking a contingency perspective on Procurement organization, understanding the internal and internal contingency factors. From a theoretical perspective, it opens up insights that can be furthermore leveraged...... in future studies in the fields of hybrid procurement organizations, global sourcing organizations as well as international procurement offices (IPOs). From a practical standpoint, an assessment of external and internal contingencies provides the opportunity to consciously match organization to its...

  13. Optimizing antiretroviral product selection: a sample approach to improving patient outcomes, saving money, and scaling-up health services in developing countries.

    Science.gov (United States)

    Amole, Carolyn D; Brisebois, Catherine; Essajee, Shaffiq; Koehler, Erin; Levin, Andrew D; Moore, Meredith C; Brown Ripin, David H; Sickler, Joanna J; Singh, Inder R

    2011-08-01

    Over the last decade, increased funding to support HIV treatment programs has enabled millions of new patients in developing countries to access the medications they need. Today, although demand for antiretrovirals continues to grow, the financial crisis has severely constrained funding leaving countries with difficult choices on program prioritization. Product optimization is one solution countries can pursue to continue to improve patient care while also uncovering savings that can be used for further scale up or other health system needs. Program managers can make procurement decisions that actually reduce program costs by considering additional factors beyond World Health Organization guidelines when making procurement decisions. These include in-country product availability, convenience, price, and logistics such as supply chain implications and laboratory testing requirements. Three immediate product selection opportunities in the HIV space include using boosted atazanavir in place of lopinovir for second-line therapy, lamivudine instead of emtricitabine in both first-line and second-line therapy, and tenofovir + lamivudine over abacavir + didanosine in second-line therapy. If these 3 opportunities were broadly implemented in sub-Saharan Africa and India today, approximately $300 million of savings would be realized over the next 5 years, enabling hundreds of thousands of additional patients to be treated. Although the discussion herein is specific to antriretrovirals, the principles of product selection are generalizable to diseases with multiple treatment options and fungible commodity procurement. Identifying and implementing approaches to overcome health system inefficiencies will help sustain and may expand quality care in resource-limited settings.

  14. Brexit and government procurement

    OpenAIRE

    Dawar, Kamala

    2017-01-01

    This briefing paper looks at some of the legal issues that will affect the UK’s public procurement laws and policies following Brexit. For, once the UK revokes the European Communities Act 1972, it will no longer be obligated to follow the EU Procurement Directives, nor will it be subject to the commitments the EU has signed up to on behalf of the UK in the WTO Government Procurement Agreement (GPA) and in Preferential Trade Agreements (PTAs). Additionally, under the Devolution Settlement of ...

  15. Access to hepatitis C virus treatment: Lessons from implementation of strategies for increasing access to antiretroviral treatment.

    Science.gov (United States)

    Assefa, Yibeltal; Hill, Peter S; Williams, Owain D

    2018-05-01

    At September's 2017 United Nations General Assembly, a state-of-the-art HIV medicine was announced to be made available at just $75 per person per year. There have been a number of strategies that the global AIDS community and countries have utilized to reduce prices and make antiretrovirals (ARVs) accessible for people living with HIV/AIDS. There appears to be an opportunity for the treatment of hepatitis C virus infection using direct-acting antivirals (DAAs) to benefit from the often painful and laboured history of driving down the prices of ARVs. In general, the success of lowering prices for ARVs has stemmed from the politics needed to initially support generic entry into the on-patent market. The use of flexibilities present in the World Trade Organization's Agreement on Trade-Related Aspects of Intellectual Property Rights (TRIPS) have been used to overcome patent barriers, with the use of compulsory licenses and/or the threat of their use as instruments for strengthening the bargaining power in price negotiations. These strategies have been combined with new financing mechanisms that have promoted more effective procurement and price negotiations. Partnership among the different stakeholders has also been critical in this regard. Countries have also invested in their health systems and implemented several strategies to reduce stigma and discrimination to increase access to and improve utilization of ARVs. This article suggests that any future international initiatives to increase access to DAAs can learn from these lessons surrounding price reduction, improved financing, advocacy, as well as health systems strengthening and stigma reduction. Adopting and reconfiguring these strategies will also incur substantial savings in time, money and lives. Crown Copyright © 2018. Published by Elsevier Ltd. All rights reserved.

  16. Ukraine : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2001-01-01

    The main objectives of the country procurement assessment are to diagnose the public procurement system in Ukraine, assess compatibility of the country's laws, policies and procedures with international best practices, review compliance with the procurement laws and regulations and identify areas for improvement of the procurement system in Ukraine. With due recognition of the considerable...

  17. Croatia : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2005-01-01

    Based on the CPAR's analysis of the legislative framework, procurement practices, institutional capacity and the opportunity for corruption, the assessment found that the environment for conducting public procurement in Croatia is average. This report makes a series of recommendations designed to strengthen the public procurement environment of Croatia, including legislative reform, improving procurement procedures and practices, institutional reform, capacity building, and the development of...

  18. Fighting corruption in tactical procurement

    NARCIS (Netherlands)

    Obanda Wanyama, Peter

    2010-01-01

    Vast amount of public resources are spent on procurement. Effective public procurement yields additional budget space, hence it ought to be conducted with due diligence. However, public procurement most especially tactical procurement in local governments in Uganda is vulnerable to corruption. In

  19. Antiretroviral therapy: current drugs.

    Science.gov (United States)

    Pau, Alice K; George, Jomy M

    2014-09-01

    The rapid advances in drug discovery and the development of antiretroviral therapy is unprecedented in the history of modern medicine. The administration of chronic combination antiretroviral therapy targeting different stages of the human immunodeficiency virus' replicative life cycle allows for durable and maximal suppression of plasma viremia. This suppression has resulted in dramatic improvement of patient survival. This article reviews the history of antiretroviral drug development and discusses the clinical pharmacology, efficacy, and toxicities of the antiretroviral agents most commonly used in clinical practice to date. Published by Elsevier Inc.

  20. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laine, Jari; Mugurusi, Godfrey

    Procurement has to find further levers and advance its contribution to corporate goals continuously. This places pressure on its organization in order to facilitate its performance. Therefore, procurement organizations constantly have to evolve in order to match these demands. A conceptual model...... and external contingency factors and having a more detailed look at the structural dimensions chosen, beyond the well-known characteristics of centralization, formalization, participation, specialization, standardization and size. From a theoretical perspective, it opens up insights that can be leveraged...

  1. Sustainable Bridge Infrastructure Procurement

    DEFF Research Database (Denmark)

    Safi, Mohammed; Du, Guangli; Simonsson, Peter

    2016-01-01

    The lack of a flexible but systematic approach for integrating lifecycle aspects into bridge investment decisions is a major obstacle hindering the procurement of sustainable bridge infrastructures. This paper addresses this obstacle by introducing a holistic approach that agencies could use...... to procure the most “sustainable” (lifecycle-efficient) bridge through a fair design-build (D-B) tendering process, considering all the main aspects: life-cycle cost (LCC), service life-span, aesthetic demands and environmental impacts (LCA)....

  2. Drug procurement and management.

    Science.gov (United States)

    Salhotra, V S

    2003-03-01

    A strong drug procurement and management system under the RNTCP is critical to programme success. Significant improvements in manufacturing, inspection, supply, storage and quality control practices and procedures have been achieved due to an intensive RNTCP network. Drugs used in RNTCP are rifampicin, isoniazid, ethambutol, pyrazinamide and streptomycin. Patients of TB are categorised into I, II and III and each category has a different standarised treatment. Procurement, distribution system and quality assurance of drugs are narrated in brief in this article.

  3. Small Business Procurement Event

    Science.gov (United States)

    2014-08-13

    Small Business Procurement Event 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of the Navy,Office of Small Business Programs,720 Kennon...distribution unlimited 13. SUPPLEMENTARY NOTES NDIA 27th Navy Gold Coast Small Business Procurement Event, 12-13 Aug 2014, San Diego, CA. 14. ABSTRACT

  4. Fighting corruption in tactical procurement

    OpenAIRE

    Obanda Wanyama, Peter

    2010-01-01

    Vast amount of public resources are spent on procurement. Effective public procurement yields additional budget space, hence it ought to be conducted with due diligence. However, public procurement most especially tactical procurement in local governments in Uganda is vulnerable to corruption. In this thesis we analyze how tactical procurement can be managed to fight corruption and promote integrity in the decentralized context in local governments in Uganda. Specifically, we identify the mos...

  5. 13 CFR 124.507 - What procedures apply to competitive 8(a) procurements?

    Science.gov (United States)

    2010-01-01

    ... boundaries are eligible to submit offers. (3) Competition for all non-construction requirements. Except for... procedures. Procuring activities will conduct competitions among and evaluate offers received from... the Participant submitted its initial offer which includes price. (5) If the procuring activity...

  6. Enhancing medicine price transparency through price information mechanisms.

    Science.gov (United States)

    Hinsch, Michael; Kaddar, Miloud; Schmitt, Sarah

    2014-05-08

    Medicine price information mechanisms provide an essential tool to countries that seek a better understanding of product availability, market prices and price compositions of individual medicines. To be effective and contribute to cost savings, these mechanisms need to consider prices in their particular contexts when comparing between countries. This article discusses in what ways medicine price information mechanisms can contribute to increased price transparency and how this may affect access to medicines for developing countries. We used data collected during the course of a WHO project focusing on the development of a vaccine price and procurement information mechanism. The project collected information from six medicine price information mechanisms and interviewed data managers and technical experts on key aspects as well as observed market effects of these mechanisms.The reviewed mechanisms were broken down into categories including objective and target audience, as well as the sources, types and volumes of data included. Information provided by the mechanisms was reviewed according to data available on medicine prices, product characteristics, and procurement modalities. We found indications of positive effects on access to medicines resulting from the utilization of the reviewed mechanisms. These include the uptake of higher quality medicines, more favorable results from contract negotiations, changes in national pricing policies, and the decrease of prices in certain segments for countries participating in or deriving data from the various mechanisms. The reviewed mechanisms avoid the methodological challenges observed for medicine price comparisons that only use national price databases. They work with high quality data and display prices in the appropriate context of procurement modalities as well as the peculiarities of purchasing countries. Medicine price information mechanisms respond to the need for increased medicine price transparency and have the

  7. Photovoltaic procurement strategies: an assessment of supply issues

    Energy Technology Data Exchange (ETDEWEB)

    Posner, D.; Costello, D.

    1980-02-01

    This review report presents the results of an analysis of alternative approaches to the design of a federal photovoltaics procurement program. Advantages and disadvantages of large purchases at fixed prices and smaller purchases for testing and demonstrating the technology are presented. The objectives and possible impacts of these purchase programs on the photovoltaic industry are described. The reactions of the industry to alternative purchase programs were assessed using personal interviews with selected companies currently active in photovoltaics. The report begins with a review of the impacts of federal procurements on other innovations, including the electronics industry, and suggests the relation of these procurements to photovoltaics. The methodology for conducting the interviews is presented next. The results of the interviews are summarized into possible scenarios of future developments in the industry and into discussions of key issues in the design of a procurement program. An appendix on the current structure of the photovoltaic industry is provided.

  8. Evaluation of Electric Power Procurement Strategies by Stochastic Dynamic Programming

    Science.gov (United States)

    Saisho, Yuichi; Hayashi, Taketo; Fujii, Yasumasa; Yamaji, Kenji

    In deregulated electricity markets, the role of a distribution company is to purchase electricity from the wholesale electricity market at randomly fluctuating prices and to provide it to its customers at a given fixed price. Therefore the company has to take risk stemming from the uncertainties of electricity prices and/or demand fluctuation instead of the customers. The way to avoid the risk is to make a bilateral contact with generating companies or install its own power generation facility. This entails the necessity to develop a certain method to make an optimal strategy for electric power procurement. In such a circumstance, this research has the purpose for proposing a mathematical method based on stochastic dynamic programming and additionally considering the characteristics of the start-up cost of electric power generation facility to evaluate strategies of combination of the bilateral contract and power auto-generation with its own facility for procuring electric power in deregulated electricity market. In the beginning we proposed two approaches to solve the stochastic dynamic programming, and they are a Monte Carlo simulation method and a finite difference method to derive the solution of a partial differential equation of the total procurement cost of electric power. Finally we discussed the influences of the price uncertainty on optimal strategies of power procurement.

  9. How (not) to design procurement mechanisms: A laboratory experiment

    NARCIS (Netherlands)

    Onderstal, S.; van de Meerendonk, A.

    2008-01-01

    In this paper, we examine the relative performance of three commonly used procurement mechanisms: price-only auctions, scoring auctions, and benchmarking. We do so both in theory and in a laboratory experiment. We find that the auctions yield the same level of welfare, and welfare dominate

  10. Indonesia - Country Procurement Assessment Report : Reforming the Public Procurement System

    OpenAIRE

    World Bank

    2001-01-01

    The main objectives of the Country Procurement Assessment Review (CPAR) are to diagnose the public procurement system in Indonesia, assess actual compliance with the country's procurement laws and regulations on the ground, and identify reforms to improve the existing system in line with internationally accepted principles. Section 1 gives an overview. Section 2 describes Indonesia's exist...

  11. CORRELATES OF PROCUREMENT PERFORMANCE OF ...

    African Journals Online (AJOL)

    Osondu

    2013-02-22

    Feb 22, 2013 ... Purpose of this study is to investigate if procurement challenges, contractual procedures, designer's experience ... Design and Build, Project Management, Direct. Labour and ..... Government Procurement Performance in.

  12. Understanding public drug procurement in India: a comparative qualitative study of five Indian states.

    Science.gov (United States)

    Singh, Prabal Vikram; Tatambhotla, Anand; Kalvakuntla, Rohini; Chokshi, Maulik

    2013-01-01

    To perform an initial qualitative comparison of the different procurement models in India to frame questions for future research in this area; to capture the finer differences between the state models through 53 process and price parameters to determine their functional efficiencies. Qualitative analysis is performed for the study. Five states: Tamil Nadu, Kerala, Odisha, Punjab and Maharashtra were chosen to ensure heterogeneity in a number of factors such as procurement type (centralised, decentralised or mixed); autonomy of the procurement organisation; state of public health infrastructure; geography and availability of data through Right to Information Act (RTI). Data on procurement processes were collected through key informant analysis by way of semistructured interviews with leadership teams of procuring organisations. These process data were validated through interviews with field staff (stakeholders of district hospitals, taluk hospitals, community health centres and primary health centres) in each state. A total of 30 actors were interviewed in all five states. The data collected are analysed against 52 process and price parameters to determine the functional efficiency of the model. The analysis indicated that autonomous procurement organisations were more efficient in relation to payments to suppliers, had relatively lower drug procurement prices and managed their inventory more scientifically. The authors highlight critical success factors that significantly influence the outcome of any procurement model. In a way, this study raises more questions and seeks the need for further research in this arena to aid policy makers.

  13. Slovakia : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2001-01-01

    This update of the 1995 CPAR is based on the September 1999 PPA and the findings of the Bank CPAR mission to Slovakia in November 1999. The 1999 Public Procurement Act (PPA) is an improvement upon the previous PPAs in some respects, including the creation of an OPP, more detailed and clear procurement procedures, accreditation of procurement professionals, introduction of the Public Procu...

  14. Tanzania : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2003-01-01

    This Country Procurement Assessment Report (CPAR)intends to determine the compatibility of national procurement law, and practices, with the principles of economy, and with international procurement practices. This CPAR, the second of its kind in Tanzania, looks at the legislative framework, the performance of regulatory functions, the enforcement regime, and the capacity of public sector ...

  15. OAS :: Accountability :: Procurement

    Science.gov (United States)

    OAS, including its organizational structure, each organizational unit's staffing, vacant posts, and a list of procurement notices for formal bids, links to the performance contract and travel control Performance Contract reports from January 2013 to June 2017 may be found.) Travel Information and Control

  16. Procurement Sustainable Building Practice

    NARCIS (Netherlands)

    Schmid, P.

    1998-01-01

    Two aspects will be stressed in the frame of this topic: The Procurement Aspects and the Aspects of Conflict and Dispute Resolution. The Right for Environment - to introduce the following aspects - is not only the consequence of care-taking for Nature as an admirable phenomenon, but also as a source

  17. 7 CFR 550.47 - Cost and price analysis.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Cost and price analysis. 550.47 Section 550.47... OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements Procurement Standards § 550.47 Cost and price analysis. Some form of cost or price analysis shall...

  18. 45 CFR 2543.45 - Cost and price analysis.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Cost and price analysis. 2543.45 Section 2543.45... ORGANIZATIONS Post-Award Requirements Property Standards § 2543.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every...

  19. 41 CFR 51-2.7 - Fair market price.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Fair market price. 51-2.7... WHO ARE BLIND OR SEVERELY DISABLED § 51-2.7 Fair market price. (a) The Committee is responsible for determining fair market prices, and changes thereto, for commodities and services on the Procurement List. The...

  20. 40 CFR 35.6585 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Cost and price analysis. 35.6585... Response Actions Procurement Requirements Under A Cooperative Agreement § 35.6585 Cost and price analysis. (a) General. The recipient must conduct and document a cost or price analysis in connection with...

  1. Healthy Food Procurement Policies and Their Impact

    Science.gov (United States)

    Niebylski, Mark L.; Lu, Tammy; Campbell, Norm R. C.; Arcand, Joanne; Schermel, Alyssa; Hua, Diane; Yeates, Karen E.; Tobe, Sheldon W.; Twohig, Patrick A.; L’Abbé, Mary R.; Liu, Peter P.

    2014-01-01

    Unhealthy eating is the leading risk for death and disability globally. As a result, the World Health Organization (WHO) has called for population health interventions. One of the proposed interventions is to ensure healthy foods are available by implementing healthy food procurement policies. The objective of this systematic review was to evaluate the evidence base assessing the impact of such policies. A comprehensive review was conducted by searching PubMed and Medline for policies that had been implemented and evaluated the impact of food purchases, food consumption, and behaviors towards healthy foods. Thirty-four studies were identified and found to be effective at increasing the availability and purchases of healthy food and decreasing purchases of unhealthy food. Most policies also had other components such as education, price reductions, and health interventions. The multiple gaps in research identified by this review suggest that additional research and ongoing evaluation of food procurement programs is required. Implementation of healthy food procurement policies in schools, worksites, hospitals, care homes, correctional facilities, government institutions, and remote communities increase markers of healthy eating. Prior or simultaneous implementation of ancillary education about healthy eating, and rationale for the policy may be critical success factors and additional research is needed. PMID:24595213

  2. Woodfuel procurement strategies of district heating plants

    International Nuclear Information System (INIS)

    Roos, A.; Bohlin, F.; Hektor, B.; Hillring, B.

    2003-01-01

    Woodfuel use in the Swedish district heating sector increased significantly from 1985 to 1999. This study analysed strategies and considerations concerning woodfuel procurement in district heating plants. Priorities and concerns in the industry involved an increased woodfuel share, ambitions to create an environmental image, cost minimisation, awareness about the role of energy policies for fuel choice, improvement of woodfuel quality and the ambition to maintain a competitive woodfuel market with several suppliers. Factor analysis yielded five dimensions in the woodfuel procurement strategies among the district heating companies: (1) increased woodfuel use; (2) import; (3) spot market woodfuel purchases; (4) focus on refined woodfuels; and (5) using price only when deciding whether to use woodfuels or other fuels. Five clusters were defined along the three strategy dimensions (1)-(3). The clusters differed concerning size, experiences from the introduction of woodfuels, perceptions about woodfuels and strategies employed to date. This paper describes different strategies that the district heating companies apply on the woodfuel market. The conclusion is that policies should consider this diversity in procurement strategies, mitigate their negative side-effects and assist to make them cost-effective. (author)

  3. PROCUREMENT AND CONTRACT MANAGEMENT

    CERN Multimedia

    Training & Development Group; Linda Orr-Easo; Tel. 72460; Nathalie Dumeaux; Tel. 78144

    2001-01-01

    We are pleased to announce the launch of a new training on: Procurement and Contract Management (This seminar will be run by CERN experts in French or in English) Level 1 The aim is to raise awareness of the key issues involved. Date : 8 June 2001 This level is open to everyone. Participants should register via our Web page as soon as possible. Level 2 To develop the skills needed to effectively manage contracts, from the Technical, Commercial and Legal aspects. Dates : Three days, Autumn 2001 This Level is open to those who are/will be more directly responsible for procurement and contract management. Participants should have followed Level 1. For a description of the seminar, please consult:   Level 1: http://training.web.cern.ch/Training/MANCO/P9798/9-cm_e.htm Level 2: http://training.web.cern.ch/Training/MANCO/P9798/9-cm2_e.htm

  4. Defense Primer: Procurement

    Science.gov (United States)

    2017-02-10

    Usually, incremental funding is used to mitigate peaks and valleys in annual budgets caused by the cost of one item significantly changing the...base defense budget . DOD uses these funds to buy several different types of materiel, including  new items easily recognizable as military...pursues a policy of full funding for procurement, meaning that the total estimated cost of each unit must be funded in the year it is budgeted . In a

  5. Designing flexible procurement systems

    OpenAIRE

    Hughes, Will

    1990-01-01

    The systems used for the procurement of buildings are organizational systems. They involve people in a series of strategic decisions, and a pattern of roles, responsibilities and relationships that combine to form the organizational structure of the project. To ensure effectiveness of the building team, this organizational structure needs to be contingent upon the environment within which the construction project takes place. In addition, a changing environment means that the organizational s...

  6. Procurement and participation opportunities

    International Nuclear Information System (INIS)

    Lovatt, D.

    1998-01-01

    The elements which drive the Sable Offshore Energy Project and its procurement processes were described. The project is privately financed, hence business practices must adhere to strict principles to be able to compete with alternative energy sources and to ensure success for all stakeholders including owners, contractors, suppliers and the business community. One of the objectives of the project is to adhere to the requirements of applicable legislation and not to compromise health, safety and environmental standards. To ensure this compliance by all concerned, the regulatory requirements are embedded in the contracting and procurement procedures. Details of the procurement cycle are described. A list of some of the successes that Nova Scotian companies have had in getting work on the project was provided as an illustration of the ingenuity and foresight of these companies to develop appropriate quality assurance and health, safety and environmental procedures, and to bring in the needed capacity and technology through the formation of joint ventures and alliances. The list of contracts represents more than 100 million dollars worth of work to date. 3 figs

  7. [Sustainability of Brazilian policy for access to antiretroviral drugs].

    Science.gov (United States)

    Grangeiro, Alexandre; Teixeira, Luciana; Bastos, Francisco I; Teixeira, Paulo

    2006-04-01

    The expense of acquiring antiretroviral drugs in Brazil has given rise to debate about the sustainability of the policy of universal access to AIDS medications, despite the evident benefits. The objective of this study was to analyze the evolution of the Ministry of Health's spending on acquiring antiretroviral drugs from 1998 to 2005, the determining factors and the medium-term sustainability of this policy (2006-2008). The study on the evolution of spending on antiretrovirals included analysis of their prices, the year-by-year expenditure, the number of patients utilizing the medication, the mean expenditure per patient and the strategies for reducing the prices maintained during this period. To analyze the sustainability of the policy for access to antiretrovirals, the cost of acquiring the drugs over the period from 2006 to 2008 was estimated, along with the proportion of gross domestic product and federal health expenditure represented by this spending. The data were collected from the Ministry of Health, the Brazilian Institute for Geography and Statistics (IBGE) and the Ministry of Planning. The expenditure on antiretrovirals increased by 66% in 2005, breaking the declining trend observed over the period from 2000 to 2004. The main factors associated with this increase were the weakening of the national generics industry and the unsatisfactory results from the process of negotiating with pharmaceutical companies. The Brazilian policy for universal access is unsustainable at the present growth rates of the gross domestic product, unless the country compromises its investments in other fields.

  8. Pro short-term procurement - U.S. utility

    International Nuclear Information System (INIS)

    Thompson, R.D.

    1990-01-01

    The author expresses the opinion that rather than focusing market discussions around short-term versus long-term procurement strategies, the parties need to be focusing on how long it is going to take to get to a predominantly market-based price both in uranium and enrichment. Long-term contracts are going to be around and will always be an important part of buyers' and sellers' strategies. It is evident that the annual term contract price renegotiations around the world are resulting in continually lower prices. When these price negotiations finally arrive in the range of the market price, a commodity market that resembles other energy commodity markets can be obtained

  9. Multicriteria analysis in public procurement

    Directory of Open Access Journals (Sweden)

    Dejan T. Tošev

    2012-07-01

    Full Text Available The public procurement is one of the most important processes in modern company daily business. The quality of that process and its realization affect the overall company success and reputation. For that purpose, the management is obliged to prepare and carry out the procurement process carefully. The process is based on multicriteria tendering and the purpose of this paper is to present the analytical and hierarchical procurement methods in order to minimize failing in the selection and decision making process.

  10. How is service procurement different from goods procurement? Exploring ex ante costs and ex post problems in IT procurement

    NARCIS (Netherlands)

    Wynstra, Finn; Rooks, Gerrit; Snijders, Chris

    2018-01-01

    Several studies suggest that, in practice, service procurement is more challenging than goods procurement. The underlying but largely implicit argument is that the procurement process for services involves higher buyer uncertainty and therefore requires extra efforts to mitigate this uncertainty.

  11. Corruption in emergency procurement.

    Science.gov (United States)

    Schultz, Jessica; Søreide, Tina

    2008-12-01

    Corruption in emergency procurement reduces the resources available for life-saving operations, lowers the quality of products and services provided, and diverts aid from those who need it most.(1) It also negatively influences public support for humanitarian relief, both in the affected country and abroad. This paper aims to unpack and analyse the following question in order to mitigate risk: how and where does corruption typically occur, and what can be done? Suggested strategies reflect a multi-layered approach that stresses internal agency control mechanisms, conflict-sensitive management, and the need for common systems among operators.

  12. Procurement Sustainability Tensions

    DEFF Research Database (Denmark)

    Fayezi, Sajad; Zomorrodi, Maryam; Bals, Lydia

    2018-01-01

    as stakeholder and institutional theory. Design/methodology/approach: The authors use a multiple case study approach. Data are collected through multiple interviews and archival data from eight case companies in Australia. Findings: The authors identify supply chain and company procurement sustainability...... of institutional distance, can characterize the manifestation of PSTs. Practical implications: The findings are instrumental for managers to make informed decisions when dealing with PSTs, and they pave the way for paradoxical leadership given the increasing importance of simultaneous development and balancing...

  13. Electricity procurement for large consumers based on Information Gap Decision Theory

    Energy Technology Data Exchange (ETDEWEB)

    Zare, Kazem; Moghaddam, Mohsen Parsa; Sheikh El Eslami, Mohammad Kazem [Tarbiat Modares University, P.O. Box 14115-111, Tehran (Iran)

    2010-01-15

    In the competitive electricity market, consumers seek strategies to meet their electricity needs at minimum cost and risk. This paper provides a technique based on Information Gap Decision Theory (IGDT) to assess different procurement strategies for large consumers. Supply sources include bilateral contracts, a limited self-generating facility, and the pool. It is considered that the pool price is uncertain and its volatility around the estimated value is modeled using an IGDT model. The proposed method does not minimize the procurement cost but assesses the risk aversion or risk-taking nature of some procurement strategies with regard to the minimum cost. Using this method, the robustness of experiencing costs higher than the expected one is optimized and the related strategy is determined. The proposed method deals with optimizing the opportunities to take advantage of low procurement costs or low pool prices. A case study is used to illustrate the proposed technique. (author)

  14. Electricity procurement for large consumers based on Information Gap Decision Theory

    International Nuclear Information System (INIS)

    Zare, Kazem; Moghaddam, Mohsen Parsa; Sheikh El Eslami, Mohammad Kazem

    2010-01-01

    In the competitive electricity market, consumers seek strategies to meet their electricity needs at minimum cost and risk. This paper provides a technique based on Information Gap Decision Theory (IGDT) to assess different procurement strategies for large consumers. Supply sources include bilateral contracts, a limited self-generating facility, and the pool. It is considered that the pool price is uncertain and its volatility around the estimated value is modeled using an IGDT model. The proposed method does not minimize the procurement cost but assesses the risk aversion or risk-taking nature of some procurement strategies with regard to the minimum cost. Using this method, the robustness of experiencing costs higher than the expected one is optimized and the related strategy is determined. The proposed method deals with optimizing the opportunities to take advantage of low procurement costs or low pool prices. A case study is used to illustrate the proposed technique.

  15. Strategy for the procurement of electronics for the LHC experiments

    CERN Document Server

    2002-01-01

    At its meeting on 14 March 2001 the Finance Committee requested the preparation of a document outlining the strategy for future procurement of electronics for the LHC experiments. The bulk of the electronics for the LHC experiments is based on custom-developed designs, the manufacturing of which will be contracted out to industry using the CERN purchasing procedures to ensure competitive prices. Analysis of on-going procurement activities for the electronics for the LHC experiments shows that in almost all cases the application of the CERN purchasing procedures has resulted in bids from a sufficient number of qualified companies to ensure competitive prices and a reasonable distribution of returns between CERN Member States. There is no reason to expect that this pattern will change significantly for the electronics that still remains to be purchased to complete the construction of the LHC experiments.

  16. Industry activities to resolve utility procurement issues

    International Nuclear Information System (INIS)

    Rosch, F.

    1993-01-01

    There are several industry organizations which are active in assisting the utilities in their equipment procurement enhancement. They include the Nuclear Management Resources Council (NUMARC), the Electric Power Research Institute (EPRI), and the Nuclear Procurement Issues Committee (NUPIC). The products include the NUMARC Procurement Initiatives, EPRI procurement related guidelines and databases, and NUPIC joint audits and commercial grade surveys. The industry procurement activities and products are reviewed, and their use by utilities to enhance their procurement process is related. 1 fig

  17. Uzbekistan : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2003-01-01

    Uzbekistan inherited the Soviet system for the procurement of goods, works and services for State needs. This system was suitable for a command economy but lacks the essential elements of competitiveness, transparency and accountability, which are the hallmarks of a market-based approach to government contracting. This Country Procurement Assessment Report (CPAR) comes at a time when a num...

  18. Economic analysis of the influence of milk market concentration on procurement efficiency in the defense system

    Directory of Open Access Journals (Sweden)

    Mihajlović Milan

    2016-01-01

    Full Text Available Increasing efficiency during realization of procurements in the defence system imposes the requirement to analyze the market, in order to detect all of its characteristics and to make conclusions which would benefit during planning of budgetary assets by one comprehensive process. Procuring milk and milk products represents a significant part of defence system's procurements which represents that a significant segment of the consumer standard of the Serbian Army, which implies the interest of authors to point to the significance of the concentration of the supply branch on the realization of procurements on the example of this market. The aim of this paper is to display the state and actual trends on the market of production and processing of milk, define methodological framework and point to the intensity and terms of competition and their influence on procurement criteria, especially price in the defence system of the Republic of Serbia.

  19. GOVERNMENT ELECTRONIC PURCHASING: AN ASSESSMENT OF BRAZILIAN STATE GOVERNMENTS' E-PROCUREMENT WEBSITES

    OpenAIRE

    Alves, Tomaz Rodrigo; Universidade de São Paulo; Souza, Cesar Alexandre; Universidade de São Paulo

    2011-01-01

    One of the electronic government applications that has been fast developing in Brazil is e-procurement. It’s a field that allows relatively objective measuring, regarding price cuts and savings generated by the reduction of bureaucracy. This research evaluated the quality of the e-procurement portals of the 26 Brazilian state governments and also the Federal District, considering primarily features that could be useful to suppliers. In order to do so, a scoring method was developed, in which ...

  20. Price fairness

    OpenAIRE

    Diller, Hermann

    2013-01-01

    Purpose – The purpose of this article is to integrate the various strands of fair price research into a concise conceptual model. Design/methodology/approach – The proposed price fairness model is based on a review of the fair pricing literature, incorporating research reported in not only English but also German. Findings – The proposed fair price model depicts seven components of a fair price: distributive fairness, consistent behaviour, personal respect and regard for the partner, fair dea...

  1. Did a local distribution company procure prudently during the California electricity crisis?

    International Nuclear Information System (INIS)

    Woo, C.-K.; Lloyd, Debra; Clayton, William

    2006-01-01

    To manage cost risk, prudent procurement of electric power requires that some portion of a buyer's energy demand be met through long-term contracting. Under cost-of-service regulation or performance-based regulation, a local distribution company (LDC) should be allowed to fully recover all prudently incurred power procurement costs. However, the regulatory test of prudence is an ex post review with the threat of disallowance. This paper presents an economic analysis of procurement prudence involving a small LDC, Bear Valley Electric Service (BVES), which serves a resort area in Southern California. The key findings are: (a) high and volatile prices and rolling blackouts characterized the market environment faced by the owner of BVES, Southern California Water Company (SCWC), at its signing of a 5-year fixed price contract; (b) SCWC was a price-taker with no incentive to act imprudently; (c) the contract was obtained via a competitive bidding process; (d) the contract price was comparable to the benchmark price of contemporaneous contracts; (e) the fixed price contract was economic when compared to available alternatives; and (f) despite (a)-(e), a negotiated settlement with the state regulator and a large user resulted in substantial disallowance. The policy implication is that a regulator should approve a prudent procurement plan proposed by an LDC to remove the unreasonable risk of an ex post review. If the LDC strictly adheres to the plan, the resulting electricity purchases are per se prudent and should entitle the LDC to full cost recovery

  2. Managing electricity procurement cost and risk by a local distribution company

    International Nuclear Information System (INIS)

    Chikeung Woo; Karimov, R.I.; Horowitz, I.

    2004-01-01

    A local electricity distribution company (LDC) can satisfy some of its future electricity requirements through self-generation and volatile spot markets, and the remainder through fixed-price forward contracts that will reduce its exposure to the inherent risk of spot-price volatility. A theoretical framework is developed for determining the forward-contract purchase that minimizes the LDCs expected procurement cost, subject to a cost-exposure constraint. The answers to the questions of ''What to buy?'' and ''How to buy?'' are illustrated using an example of a hypothetical LDC that is based on a municipal utility in Florida. It is shown that the LDCs procurement decision is consistent with least-cost procurement subject to a cost-exposure constraint, and that an internet-based multi-round auction can produce competitive price quotes for its desired forward purchase. (author)

  3. Managing electricity procurement cost and risk by a local distribution company

    International Nuclear Information System (INIS)

    Woo, C.-K.; Karimov, R.I.; Horowitz, Ira

    2004-01-01

    A local electricity distribution company (LDC) can satisfy some of its future electricity requirements through self-generation and volatile spot markets, and the remainder through fixed-price forward contracts that will reduce its exposure to the inherent risk of spot-price volatility. A theoretical framework is developed for determining the forward-contract purchase that minimizes the LDCs expected procurement cost, subject to a cost-exposure constraint. The answers to the questions of 'What to buy?' and 'How to buy?' are illustrated using an example of a hypothetical LDC that is based on a municipal utility in Florida. It is shown that the LDCs procurement decision is consistent with least-cost procurement subject to a cost-exposure constraint, and that an internet-based multi-round auction can produce competitive price quotes for its desired forward purchase

  4. Dynamic Pricing

    DEFF Research Database (Denmark)

    Sharifi, Reza; Anvari-Moghaddam, Amjad; Fathi, S. Hamid

    2017-01-01

    Dynamic pricing scheme, also known as real-time pricing (RTP), can be more efficient and technically beneficial than the other price-based schemes (such as flat-rate or time-of-use (TOU) pricing) for enabling demand response (DR) actions. Over the past few years, advantages of RTP-based schemes h...... of dynamic pricing can lead to increased willingness of consumers to participate in DR programs which in turn improve the operation of liberalized electricity markets.......Dynamic pricing scheme, also known as real-time pricing (RTP), can be more efficient and technically beneficial than the other price-based schemes (such as flat-rate or time-of-use (TOU) pricing) for enabling demand response (DR) actions. Over the past few years, advantages of RTP-based schemes...

  5. 22 CFR 226.45 - Cost and price analysis.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Cost and price analysis. 226.45 Section 226.45 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.45 Cost and price analysis. Some...

  6. A cross-sectional survey of the models in Bihar and Tamil Nadu, India for pooled procurement of medicines.

    Science.gov (United States)

    Chokshi, Maulik; Farooqui, Habib Hasan; Selvaraj, Sakthivel; Kumar, Preeti

    2015-01-01

    In India, access to medicine in the public sector is significantly affected by the efficiency of the drug procurement system and allied processes and policies. This study was conducted in two socioeconomically different states: Bihar and Tamil Nadu. Both have a pooled procurement system for drugs but follow different models. In Bihar, the volumes of medicines required are pooled at the state level and rate contracted (an open tender process invites bidders to quote for the lowest rate for the list of medicines), while actual invoicing and payment are done at district level. In Tamil Nadu, medicine quantities are also pooled at state level but payments are also processed at state level upon receipt of laboratory quality-assurance reports on the medicines. In this cross-sectional survey, a range of financial and non-financial data related to procurement and distribution of medicine, such as budget documents, annual reports, tender documents, details of orders issued, passbook details and policy and guidelines for procurement were analysed. In addition, a so-called ABC analysis of the procurement data was done to to identify high-value medicines. It was observed that Tamil Nadu had suppliers for 100% of the drugs on their procurement list at the end of the procurement processes in 2006, 2007 and 2008, whereas Bihar's procurement agency was only able to get suppliers for 56%, 59% and 38% of drugs during the same period. Further, it was observed that Bihar's system was fuelling irrational procurement; for example, fluconazole (antifungal) alone was consuming 23.4% of the state's drug budget and was being procured by around 34% of the districts during 2008-2009. Also, the ratios of procurement prices for Bihar compared with Tamil Nadu were in the range of 1.01 to 22.50. For 50% of the analysed drugs, the price ratio was more than 2, that is, Bihar's procurement system was procuring the same medicines at more than twice the prices paid by Tamil Nadu. Centralized

  7. (DeCentralization of Public Procurement at the Local Level in the EU

    Directory of Open Access Journals (Sweden)

    Boštjan BREZOVNIK

    2015-10-01

    Full Text Available The so-called decentralization of public procurement in EU Member States is accepted as the most suitable design of the public procurement system, often justifi ed by greater economic effi ciency and by the possibility of boosting the development of small and medium-sized enterprises, which act on the public procurement market as providers of goods, services and works. Despite the existence of highly decentralized public procurement systems which refl ect the decentralization of administrative systems, especially after the recession, there is a stronger tendency for centralization of public procurement in the EU. The so-called aggregation of demand by contracting authorities can be done in order to achieve economies of scale, including lower prices and transaction costs as well as to improve and professionalize the management of procurement procedures (as highlighted in the Directive 2014/24/EU by the European Parliament and the EU Council. However, even in the context of public procurement centralization, local contracting authorities (i.e., public administration authorities and organizations in Member States should be provided with a suffi ciently wide range of possible (centralized organizational structures and contractual (vertical and horizontal public-public partnerships which will allow them to select the most suitable and most economically effective organizational structure for the execution of public procurement.

  8. Applying e-procurement system in the healthcare: the EPOS paradigm

    Science.gov (United States)

    Ketikidis, Panayiotis H.; Kontogeorgis, Apostolos; Stalidis, George; Kaggelides, Kostis

    2010-03-01

    One of the goals of procurement is to establish a competitive price, while e-procurement utilises electronic commerce to identify potential sources of supply, to purchase goods and services, to exchange contractual information and to interact with suppliers. Extensive academic work has been extensively devoted to e-procurement in diverse industries. However, applying e-procurement in the healthcare sector remains unexplored. It lacks an efficient e-procurement mechanism that will enable hospitals and healthcare suppliers to electronically exchange contractual information, aided by the technologies of optimisation and business rules. The development and deployment of e-procurement requires a major effort in the coordination of complex interorganisational business process. This article presents an e-procurement optimised system (EPOS) for the healthcare marketplace, a complete methodological approach for deploying and operating such system, as piloted in public and private hospitals in three European countries (Greece, Spain and Belgium) and suppliers of healthcare items in the fourth country (Italy). The efficient e-procurement mechanism that EPOS suggests enables hospitals and pharmaceutical and medical equipment suppliers to electronically exchange contractual information.

  9. Proposed methodology for monitoring antiretroviral drugs price negotiations in Latin America and the Caribbean Propuesta de metodología para monitorear la negociación de precios de los medicamentos antirretrovirales en América Latina y el Caribe

    Directory of Open Access Journals (Sweden)

    Claudia G. S. Osorio-de-Castro

    2009-08-01

    Full Text Available OBJECTIVES: The spread of HIV/AIDS challenges governments to provide antiretroviral (ARV treatment at affordable prices, and various initiatives have been developed with that intent. In Latin America and the Caribbean, four subregional negotiations were conducted during 2002-2005 to reduce drug prices and thus broaden access to ARVs. Studies were carried out to monitor the negotiations, and the development of a monitoring methodology was recommended. The objective of the current study was to develop and describe a potential methodology for monitoring ARV price negotiations. METHODS: The study, carried out in 2006-2007, consisted of a design phase and validation phase. The design phase included an extensive literature review and development of a theoretical framework. Validation was performed using health professional consensus and pilot studies in three countries-Barbados, Honduras, and Peru-representing the Caribbean, Central American, and Andean subregions. RESULTS: The results included a detailed logic model and a 40-indicator framework. Both were tested in the field. Indicators were evaluated for feasibility, pertinence, and sensitivity, based on the outcome of the pilot study. CONCLUSIONS: This monitoring methodology is designed to help countries self-evaluate progress toward implementation of ARV price negotiations. The results of the pilot study indicate that its implementation in the field helped elucidate the ARV price negotiation process by identifying local conditions and indirectly measuring countries' negotiating capacities.OBJETIVO: La diseminación del VIH/sida exige de los gobiernos suministrar el tratamiento antirretroviral (ARV a precios asequibles y se han desarrollado varias iniciativas con ese fin. En América Latina y el Caribe se han realizado cuatro negociaciones subregionales entre 2002 y 2005 para reducir los precios de los medicamentos y así ampliar el acceso a los ARV. Se han realizado estudios para monitorear las

  10. 40 CFR 35.6565 - Procurement methods.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  11. Gas pricing in Europe. Pt. 1. Wholesale markets

    International Nuclear Information System (INIS)

    Donath, R.

    1996-01-01

    The article investigates gas pricing in the European procurement market and the wholesale markets of the most important EU consumer markets. It demonstrates that value-oriented pricing principles override cost-oriented pricing principles. For one thing, and independently of pricing principles, two- or three-part demand price systems or basic price systems are common. For another, the frequently encountered opportunities for the differentiation of prices show that as long as there is merely substitution competition instead of direct competition, gas suppliers have a certain degree of freedom in fixing their prices. By contrast, the introduction of direct competition in Great Britain has reduced suppliers' individual price fixing margins, because short-term supply and demand variations in the now created spot market are decisive for gas pricing. (orig.) [de

  12. Energy wood procurement in connection with conventional wood procurement; Energiapuun hankinnan organisointi muun puunhankinnan yhteydessae - PUUT02

    Energy Technology Data Exchange (ETDEWEB)

    Maekinen, P. [Finnish Forest Research Institute, Vantaa (Finland)

    2001-07-01

    The research consisted of two sub-projects. The present role of forestry associations in procurement of energy wood was investigated in the first sub- project. The possibilities and willingness of them to increase the energy wood procurement were also studied. The role of forest machine and forestry service entrepreneurs in procurement of energy wood was investigated in the second sub-project. The effects of energy wood procurement on the operation of the forest machine companies in general were also studied in this sub-project. The sub-project three studied the requirements of the customer companies for the energy wood suppliers. All the material of the sub-projects was collected by personal inquiries. According to the executive directors of the forestry associations the role of the forestry associations in energy wood procurement varied between a by-stander and active participant. Active forestry associations announced the companies for stands available for cutting. They told also that they directed the harvesting to correct sites and deliver stems at the roadside. The role of the forestry association was emphasised especially when the associations on the basis of a letter of attorney carried out the timber trade. It was estimated that in the near future the operation of forest machine entrepreneurs in harvesting of energy wood would increase significantly. From the employment and turnover point of view the role of harvesting of energy wood was not seen as a significant matter. On the other hand, that harvesting of energy wood impede the harvesting of commercial timber was seen as a more significant matter. In the future the end-users of energy wood would like to have more competition in the energy wood markets. However, the energy wood suppliers were desired to be relative large so that the reliability of deliveries could be ensured. Simultaneously as the end-users wanted to decrease the price of forest chips, the machine entrepreneurs estimated the price to

  13. PROMIS (Procurement Management Information System)

    Science.gov (United States)

    1987-01-01

    The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.

  14. Procurement Policy for Armored Vehicles

    National Research Council Canada - National Science Library

    Jolliffe, Richard B; Burton, Bruce A; Carros, Deborah L; Schaefer, Beth K; Truong, Linh; Palmer, Kevin A; Chun, Judy M; Smith, Jessica M; Abraham, Amanda M; Peters, Anthony R

    2007-01-01

    Congresswoman Louise M. Slaughter requested that the Inspector General (IG), DoD review the DoD procurement history for body armor and armored vehicles and determine whether officials properly followed contracting policies...

  15. Transfer Pricing

    DEFF Research Database (Denmark)

    Nielsen, Søren Bo

    2014-01-01

    Against a background of rather mixed evidence about transfer pricing practices in multinational enterprises (MNEs) and varying attitudes on the part of tax authorities, this paper explores how multiple aims in transfer pricing can be pursued across four different transfer pricing regimes. A MNE h...

  16. Gold prices

    OpenAIRE

    Joseph G. Haubrich

    1998-01-01

    The price of gold commands attention because it serves as an indicator of general price stability or inflation. But gold is also a commodity, used in jewelry and by industry, so demand and supply affect its pricing and need to be considered when gold is a factor in monetary policy decisions.

  17. Intervening in global markets to improve access to HIV/AIDS treatment: an analysis of international policies and the dynamics of global antiretroviral medicines markets

    Directory of Open Access Journals (Sweden)

    Hochstadt Jenny

    2010-05-01

    Full Text Available Abstract Background Universal access to antiretroviral therapy (ART in low- and middle-income countries faces numerous challenges: increasing numbers of people needing ART, new guidelines recommending more expensive antiretroviral (ARV medicines, limited financing, and few fixed-dose combination (FDC products. Global initiatives aim to promote efficient global ARV markets, yet little is known about market dynamics and the impact of global policy interventions. Methods We utilize several data sources, including 12,958 donor-funded, adult first-line ARV purchase transactions, to describe the market from 2002-2008. We examine relationships between market trends and: World Health Organization (WHO HIV/AIDS treatment guidelines; WHO Prequalification Programme (WHO Prequal and United States (US Food and Drug Administration (FDA approvals; and procurement policies of the Global Fund to Fight AIDS, Tuberculosis, and Malaria (GFATM, US President's Emergency Plan for AIDS Relief (PEPFAR and UNITAID. Results WHO recommended 7, 4, 24, and 6 first-line regimens in 2002, 2003, 2006 and 2009 guidelines, respectively. 2009 guidelines replaced a stavudine-based regimen ($88/person/year with more expensive zidovudine- ($154-260/person/year or tenofovir-based ($244-465/person/year regimens. Purchase volumes for ARVs newly-recommended in 2006 (emtricitabine, tenofovir increased >15-fold from 2006 to 2008. Twenty-four generic FDCs were quality-approved for older regimens but only four for newer regimens. Generic FDCs were available to GFATM recipients in 2004 but to PEPFAR recipients only after FDA approval in 2006. Price trends for single-component generic medicines mirrored generic FDC prices. Two large-scale purchasers, PEPFAR and UNITAID, together accounted for 53%, 84%, and 77% of market volume for abacavir, emtricitabine, and tenofovir, respectively, in 2008. PEPFAR and UNITAID purchases were often split across two manufacturers. Conclusions Global initiatives

  18. Intervening in global markets to improve access to HIV/AIDS treatment: an analysis of international policies and the dynamics of global antiretroviral medicines markets.

    Science.gov (United States)

    Waning, Brenda; Kyle, Margaret; Diedrichsen, Ellen; Soucy, Lyne; Hochstadt, Jenny; Bärnighausen, Till; Moon, Suerie

    2010-05-25

    Universal access to antiretroviral therapy (ART) in low- and middle-income countries faces numerous challenges: increasing numbers of people needing ART, new guidelines recommending more expensive antiretroviral (ARV) medicines, limited financing, and few fixed-dose combination (FDC) products. Global initiatives aim to promote efficient global ARV markets, yet little is known about market dynamics and the impact of global policy interventions. We utilize several data sources, including 12,958 donor-funded, adult first-line ARV purchase transactions, to describe the market from 2002-2008. We examine relationships between market trends and: World Health Organization (WHO) HIV/AIDS treatment guidelines; WHO Prequalification Programme (WHO Prequal) and United States (US) Food and Drug Administration (FDA) approvals; and procurement policies of the Global Fund to Fight AIDS, Tuberculosis, and Malaria (GFATM), US President's Emergency Plan for AIDS Relief (PEPFAR) and UNITAID. WHO recommended 7, 4, 24, and 6 first-line regimens in 2002, 2003, 2006 and 2009 guidelines, respectively. 2009 guidelines replaced a stavudine-based regimen ($88/person/year) with more expensive zidovudine- ($154-260/person/year) or tenofovir-based ($244-465/person/year) regimens. Purchase volumes for ARVs newly-recommended in 2006 (emtricitabine, tenofovir) increased >15-fold from 2006 to 2008. Twenty-four generic FDCs were quality-approved for older regimens but only four for newer regimens. Generic FDCs were available to GFATM recipients in 2004 but to PEPFAR recipients only after FDA approval in 2006. Price trends for single-component generic medicines mirrored generic FDC prices. Two large-scale purchasers, PEPFAR and UNITAID, together accounted for 53%, 84%, and 77% of market volume for abacavir, emtricitabine, and tenofovir, respectively, in 2008. PEPFAR and UNITAID purchases were often split across two manufacturers. Global initiatives facilitated the creation of fairly efficient markets

  19. Procurement engineering - the productivity factor

    Energy Technology Data Exchange (ETDEWEB)

    Bargerstock, S.B. (TENERA, L.P., Chattanooga, TN (United States))

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment. Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.

  20. The organization of organ procurement.

    Science.gov (United States)

    Prottas, J M

    1989-01-01

    The American organ procurement system has improved and matured in the last five years. At the same time, the basic challenges facing it have remained substantially the same because the moral and legal framework of the system has not changed. Success at organ procurement continues to depend on the voluntary cooperation of medical professionals and the families of potential organ donors. The generosity of the American public is so great that the primary challenge facing organ procurement agencies is obtaining cooperation from hospitals and medical professionals. This calls for a "marketing" orientation aimed at those hospitals and professionals who are most likely to treat potential donors. The last five years have seen a more general acceptance of this appreciation of the central task of organ procurement. As a result, the overall effectiveness of the system has improved, as measured by the number of organs procured on a per capita basis and by the number of multiorgan donors obtained. Much of this improvement can be attributed to the diffusion of organizational techniques and approaches, and this diffusion has been encouraged by the involvement of national organizations and public bodies in the organ procurement community. The system remains uneven in its effectiveness and further improvement is possible. It is also possible that the next general round of improvement will result from the application of businesslike information management and marketing techniques.

  1. Procurement engineering - the productivity factor

    International Nuclear Information System (INIS)

    Bargerstock, S.B.

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O ampersand M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment. Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O ampersand M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station

  2. Sustainable Procurement in Practice: Explaining the Degree of Sustainable Procurement from an Organisational Perspective

    NARCIS (Netherlands)

    J. Grandia (Jolien); S.M. Groeneveld (Sandra); B.S. Kuipers (Ben); A.J. Steijn (Bram)

    2013-01-01

    textabstractSustainable procurement is often used to reduce negative environmental impacts related to production and consumption. Several studies in the sustainable procurement literature have identified potential drivers of and barriers to sustainable procurement, which are often organisational in

  3. Individualization of antiretroviral therapy

    Directory of Open Access Journals (Sweden)

    Pavlos R

    2011-12-01

    Full Text Available Rebecca Pavlos, Elizabeth J PhillipsInstitute for Immunology and Infectious Diseases, Murdoch University, Murdoch, Western Australia, AustraliaAbstract: Antiretroviral therapy (ART has evolved considerably over the last three decades. From the early days of monotherapy with high toxicities and pill burdens, through to larger pill burdens and more potent combination therapies, and finally, from 2005 and beyond where we now have the choice of low pill burdens and once-daily therapies. More convenient and less toxic regimens are also becoming available, even in resource-poor settings. An understanding of the individual variation in response to ART, both efficacy and toxicity, has evolved over this time. The strong association of the major histocompatibility class I allele HLA-B*5701 and abacavir hypersensitivity, and its translation and use in routine HIV clinical practice as a predictive marker with 100% negative predictive value, has been a success story and a notable example of the challenges and triumphs in bringing pharmacogenetics to the clinic. In real clinical practice, however, it is going to be the exception rather than the rule that individual biomarkers will definitively guide patient therapy. The need for individualized approaches to ART has been further increased by the importance of non-AIDS comorbidities in HIV clinical practice. In the future, the ideal utilization of the individualized approach to ART will likely consist of a combined approach using a combination of knowledge of drug, virus, and host (pharmacogenetic and pharmacoecologic [factors in the individual's environment that may be dynamic over time] information to guide the truly personalized prescription. This review will focus on our knowledge of the pharmacogenetics of the efficacy and toxicity of currently available antiretroviral agents and the current and potential utility of such information and approaches in present and future HIV clinical care.Keywords: HIV

  4. Controlling fuel costs: Procurement strategies and regulatory standards

    International Nuclear Information System (INIS)

    Einhorn, H.A.; Levi, B.I.

    1992-01-01

    Since the oil price shocks and inflation of the 1970s, regulatory authorities and utilities have devoted considerable attention to controlling energy costs while maintaining reliable service. Although much of this concern has been directed towards capital cost containment, increasing scrutiny has been applied to a broad range of variable costs, especially to fuel procurement expenditures. With some 40% to 65% of the electric utility industry's annual operation and maintenance expenses paid to secure fuel supplies, even a small difference in fuel costs could have a substantial impact on costs to ratepayers. This increased attention to fuel cost containment can be expected to intensify as implementation of the 1990 amendments to the Clean Air Act affects fuel purchase decisions. To assure that fuel is purchased in a responsible and cost-effective manner, some state jurisdictions have initiated periodic reviews (audits) of the procurement practices that electric utilities follow when purchasing fuel. While a utility must demonstrate how it purchases fuel, there is wide variation in interest and scope of audits among jurisdictions. In this paper, the authors review: (1) the regulatory environment within which fuel procurement and audits occur, and (2) some particularly controversial issues that will receive increasing attention as the practice of conducting fuel procurement audits spreads

  5. The transformation of the tender evaluation process in public procurement in Poland

    Science.gov (United States)

    Plebankiewicz, E.; Kozik, R.

    2017-10-01

    Procedures regarding the evaluation of tenders have been changed since the public procurement law was enacted (it came into force in January 1, 1995). The contracting authority could apply both the criteria related to the qualities of the contractor and those related to the to the subject - matter of public contract. Two extensive amendments in 2001 and a government project introduced vital regulations and excluded the possibility of applying criteria related to the qualities of the contractor. Act of 29 January 2004 Public Procurement Law allowed to use price as the sole contract award criterion. The changes in the Law in 2014 restricted that possibility to the situation in which the subject matter of a contract is commonly available and has established quality standards. The Act of 22 June 2016 amending the Public Procurement Law Act and some other laws introduced the new criteria list and limited the importance of the price criterion in the certain situations. Instead of price, the cost can also be a criterion for tender evaluation. The cost criterion can be determined using life cycle costing. In the paper, based on contract notices of open tendering published in the Public Procurement Bulletin, the criteria of construction contract selection will be analysed. In particular the effectiveness of changes in the Procurement Law will be researched.

  6. PROCUREMENT INSOURCING VS. PROCUREMENT OUTSOURCING: EVIDENCE FROM SERBIA

    Directory of Open Access Journals (Sweden)

    Slobodan Acimovic

    2016-11-01

    Full Text Available One of the most important strategic decisions of a company is to choose whether to insource or outsource a particular group of activities or a business function. The trend of outsourcing those activities which do not form a part of the company core competences is becoming more and more present in business practice. The aim of the analysis within this paper is to review the mentioned trend from the position of organizing the company procurement activities. The analysis shows that there is no unique trend concerning outsourcing all logistics activities, which do not form a part of the company core competences. Unlike the majority of other logistics activities, which as non-basic, tend to be outsourced, procurement dominantly stays insourced. Finally, based on the empirical evidence obtained from a survey carried out among 52 companies in Serbia, it is concluded that even if procurement is outsourced, this trend is more present among service than production companies.

  7. THE BARRIERS OF IMPLEMENTING E-PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Corina Pop Sitar

    2011-01-01

    Full Text Available The concept of e-procurement has many different meanings ranging from shopping on theinternet (through reverse auction to collaborative initiatives taking place in virtualmeetings. There are many forms of e-procurement that can be found in the literature. In thispaper we define the most important forms of e-procurement. Next, we present the mainbarriers of implementing an e-procurement found in the literature. Furthermore, we presenta matrix with the main barriers of e-procurement classified in four main categories. Finally,we elaborated for managers some guidelines in order to overcome the barriers ofimplementing e-procurement.

  8. Analisis dan Perancangan Aplikasi Berbasis Web E-Procurement di PT Pillar Utama Contrindo

    Directory of Open Access Journals (Sweden)

    Sartika Kurniali

    2012-12-01

    Full Text Available The aim of this research is to analyze the current business process at the procurement department at PT Pillar Utama Contrindo as well as develop a web based e-procurement application prototype to supportprocurement process at the company. Interview, survey, as well as analysis and design to develop the prototype are used in the research. The research results in an e-procurement application prototype built to minimize errors on related document filling, help the company to get best price on their supply, and increase control. It can be concluded from the research that the protoype can be implemented to be a tool for the users to decide the best supplier, obtain the best price, and increase control in buying process at PT Pillar Utama Contrindo.

  9. Antiretroviral drug supply challenges in the era of scaling up ART in Malawi.

    Science.gov (United States)

    Schouten, Erik J; Jahn, Andreas; Ben-Smith, Anne; Makombe, Simon D; Harries, Anthony D; Aboagye-Nyame, Francis; Chimbwandira, Frank

    2011-07-06

    The number of people receiving antiretroviral treatment (ART) has increased considerably in recent years and is expected to continue to grow in the coming years. A major challenge is to maintain uninterrupted supplies of antiretroviral (ARV) drugs and prevent stock outs. This article discusses issues around the management of ARVs and prevention of stock outs in Malawi, a low-income country with a high HIV/AIDS burden, and a weak procurement and supply chain management system. This system for ARVs, paid for by the Global Fund to Fight AIDS, Tuberculosis and Malaria, and bypassing the government Central Medical Stores, is in place, using the United Nations Children's Fund's (UNICEF's) procurement services. The system, managed by a handful of people who spend limited time on supply management, is characterized by a centrally coordinated quantification based on verified data from all national ART clinics, parallel procurement through UNICEF, and direct distribution to ART clinics. The model worked well in the first years of the ART programme with a single first-line ARV regimen, but with more regimens becoming available (e.g., alternative first-line, second-line and paediatric regimens), it has become more difficult to administer. Managing supplies through a parallel system has the advantage that weaknesses in the national system have limited influence on the ARV procurement and supply chain management system. However, as the current system operates without a central warehouse and national buffer stock capacity, it diminishes the ability to prevent ARV stock outs. The process of ordering ARVs, from the time that estimates are made to the arrival of supplies in health facilities, takes approximately one year. Addressing the challenges involved in maintaining ARVs through an efficient procurement and supply chain management system that prevents ARV stock outs through the establishment of a dedicated procurement team, a central warehouse and/or national buffer stock is a

  10. Economic Regime identification and prediction in TAC SCM using sales and procurement information

    NARCIS (Netherlands)

    Hogenboom, F.P.; Ketter, W.; Dalen, van Jan; Kaymak, U.; Collins, J.; Gupta, Alok

    2009-01-01

    Our research is focused on the effects of the additionof procurement information (offer prices) to a sales-based economic regime model. This model is used for strategic, tactical, and operational decision making in dynamic supply chains. We evaluate the performance of the regime model through

  11. Identifying and predicting economic regimes in supply chains using sales and procurement information

    NARCIS (Netherlands)

    Hogenboom, F.P.; Ketter, W.; Dalen, van Jan; Kaymak, U.; Collins, J.; Gupta, Alok

    2009-01-01

    We investigate the effects of adding procurement information (component offer prices) to a sales-based economic regime model, which is used for strategic, tactical, and operational decision making in dynamic supply chains. The performance of the regime model is evaluated through experiments with the

  12. Transfer Pricing

    DEFF Research Database (Denmark)

    Rohde, Carsten; Rossing, Christian Plesner

    trade internally as the units have to decide what prices should be paid for such inter-unit transfers. One important challenge is to uncover the consequences that different transfer prices have on the willingness in the organizational units to coordinate activities and trade internally. At the same time...... the determination of transfer price will affect the size of the profit or loss in the organizational units and thus have an impact on the evaluation of managers‟ performance. In some instances the determination of transfer prices may lead to a disagreement between coordination of the organizational units...

  13. NASA Procurement Career Development Program

    Science.gov (United States)

    1987-01-01

    The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.

  14. The influence of the PFI on waste management pricing

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    This report analyses the pricing mechanisms generated within the waste management sector under the Private Finance Initiative (PFI) and compares them with the cost-plus pricing mechanisms. The background to the research is traced, and the influence of the PFI on service procurement, the incentives to use PFI, the procurement process, and the allocation of contractual risk are discussed. The PFI pricing mechanisms are described, and a case study of a hypothetical local authority involved in the tender for integrated waste management services is created to illustrate the pricing mechanisms under the PFI, comparisons with traditional pricing, and a quantitative analysis. A non-PFI model, a PFI 20 year model, and PFI 25 year model are presented in the appendix.

  15. The influence of the PFI on waste management pricing

    International Nuclear Information System (INIS)

    2000-01-01

    This report analyses the pricing mechanisms generated within the waste management sector under the Private Finance Initiative (PFI) and compares them with the cost-plus pricing mechanisms. The background to the research is traced, and the influence of the PFI on service procurement, the incentives to use PFI, the procurement process, and the allocation of contractual risk are discussed. The PFI pricing mechanisms are described, and a case study of a hypothetical local authority involved in the tender for integrated waste management services is created to illustrate the pricing mechanisms under the PFI, comparisons with traditional pricing, and a quantitative analysis. A non-PFI model, a PFI 20 year model, and PFI 25 year model are presented in the appendix

  16. URGENSI STUDI TENTANG PROCUREMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Yohanes Sogar Simamora

    2006-01-01

    Full Text Available Contractualization is kind of goverment activity in acquiring goods, services and infrastructure as well. Procurement contract has several important function especially in enhancing economic development in a state. In Indonesia, this kind of contract also has function in empowering micro economic scale. Since the aim of procurement study is to provide equal protection between public fund interest in one hand and privat sector in the other hand, general principle of contract law must be taken into consideration together with transparency as the most important principle in government contract.

  17. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  18. Public Procurement of Innovation in Sweden

    DEFF Research Database (Denmark)

    Rolfstam, Max; Ågren, Robert

    2014-01-01

    Sweden is often thought of as a country with a strong tradition for using public procurement as a means to stimulate innovation. Early on, Sweden recognized and developed procedures for using public procurement as a technologydevelopment tool. After a period where emphasis was put on this aspect ...... government authorities to engage in public procurement for innovation, and by issuing guidance on the topic.......Sweden is often thought of as a country with a strong tradition for using public procurement as a means to stimulate innovation. Early on, Sweden recognized and developed procedures for using public procurement as a technologydevelopment tool. After a period where emphasis was put on this aspect...... of public procurement Sweden dropped many policy initiatives within this field. This was in part due to neo-liberal movements during the 1980s which in interaction with a distributed institutional setup led to the removal of incentives for a procuring authority to engage in public procurement of innovation...

  19. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  20. Petroleum price

    International Nuclear Information System (INIS)

    Chevallier, B.

    2009-01-01

    The 'AFTP' conference on 'petroleum prices' organized by Total last March, tries to explain the different aspects of the crisis we undergo for July 2007 and its consequential effects on the petroleum markets (supply, demand evolvements, impacts on reserves, prices, refining...). (O.M.)

  1. public procurement, governance and economic growth

    African Journals Online (AJOL)

    GRACE

    Development (OECD) sees public procurement ―as a strategic policy lever to advance ... financial markets and provision of advisory services to businesses and government. ... Procurement established by the Section 3 of the Act. The BPP is the ... present annual reports to the Minister on the public procurement processes;.

  2. 78 FR 37525 - Procurement List; Deletions

    Science.gov (United States)

    2013-06-21

    .... Contracting Activity: Dept of the Air Force, FA7014 AFDW A7KI, Andrews AFB, MD. Service Type/Location: Laundry... Procurement List. SUMMARY: This action deletes products and services from the Procurement List that were... products and services listed below are no longer suitable for procurement by the Federal Government under...

  3. 22 CFR 226.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement records. 226.46 Section 226.46 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.46 Procurement records...

  4. 10 CFR 436.43 - Procurement planning.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...

  5. 10 CFR 21.31 - Procurement documents.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Procurement documents. 21.31 Section 21.31 Energy NUCLEAR REGULATORY COMMISSION REPORTING OF DEFECTS AND NONCOMPLIANCE Procurement Documents § 21.31 Procurement documents. Each individual, corporation, partnership, dedicating entity, or other entity subject to the...

  6. 7 CFR 225.17 - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ...) Procurements by public sponsors comply with applicable State or local laws and the standards set forth in 7 CFR part 3016; and (2) Procurements by private nonprofit sponsors comply with standards set forth in 7 CFR... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement standards. 225.17 Section 225.17...

  7. 10 CFR 603.1300 - Procurement contract.

    Science.gov (United States)

    2010-01-01

    ... Used in this Part § 603.1300 Procurement contract. A Federal Government procurement contract. It is a... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy... Government and a State, a local government, or other non-government entity when the principal purpose of the...

  8. 32 CFR 37.1330 - Procurement contract.

    Science.gov (United States)

    2010-07-01

    ... REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in This Part § 37.1330 Procurement contract. A Federal Government procurement contract. It is a legal instrument which, consistent with 31 U.S... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement contract. 37.1330 Section 37.1330...

  9. Tanzania : Country Procurement Assessment Report, Executive Summary

    OpenAIRE

    World Bank

    2004-01-01

    This Country Procurement Assessment Report (CPAR)intends to determine the compatibility of national procurement law, and practices, with the principles of economy, and with international procurement practices. This CPAR, the second of its kind in Tanzania, looks at the legislative framework, the performance of regulatory functions, the enforcement regime, and the capacity of public sector ...

  10. 76 FR 43988 - Procurement List; Additions

    Science.gov (United States)

    2011-07-22

    ... this work, based on applicable experience. Finally, the purpose of the JWOD Act and the responsibility... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be...

  11. 7 CFR 1780.72 - Procurement methods.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  12. 76 FR 26279 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-05-06

    ...-service area; clean and sanitize food service equipment, utensil cleaning, and dishwashing; clean pots... additions to the Procurement List. SUMMARY: The Committee is proposing to add services to the Procurement... in this notice will be required to procure the services listed below from nonprofit agencies...

  13. Competitive Procurement and Asset Specificity

    NARCIS (Netherlands)

    Sorana, V.

    2003-01-01

    This paper studies the effects of asset specificity on the performance of procurement auctions with subcontracting and asset sales.The analysis highlights the role of several asset features like transfer costs, type of alternative uses and maintenance requirements.It is argued that, if bargaining

  14. Organ procurement: let's presume consent

    OpenAIRE

    Moustarah, F

    1998-01-01

    IN WINNING FIRST PRIZE in the Logie Medical Ethics Essay Contest in 1997, Dr. Fady Moustarah made a strong and compelling argument in favour of presumed consent in the procurement of donor organs. He stressed that a major education campaign will be needed when such a policy is adopted lest some people begin to regard physicians as "organ vultures."

  15. Pakistan : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2000-01-01

    This report analyzes Pakistan's procurement system, and presents an extensive set of recommendations for strengthening same. It reviews the legal, and regulatory framework, as well as the mandatory registration and/or pre-qualification of suppliers, and contractors, and negotiation practices, and, analyzes bidding document issues for recommendation. Human resources development, auditing pr...

  16. The view of Japanese utilities on uranium procurement

    International Nuclear Information System (INIS)

    Kishida, Tetsuji

    1991-01-01

    Since Japan is entirely dependent on imports to meet its demand for uranium, its foremost consideration is security of supply. From this point of view, the long-term strategy for uranium procurement followed by the Japanese Government and utilities can be summarized in four points; diversification of supply sources, long term contracts, holding of sufficient inventory and self-supply (ie. involvement in exploration activity and mine development). Under this basic strategy, Japanese utilities have made decisions on which suppliers they buy uranium from, and which purchasing method to adopt, based on the principles of securing stable sources of supply and stable prices. This position is reviewed and discussed. (author)

  17. Gas prices and price process

    International Nuclear Information System (INIS)

    Groenewegen, G.G.

    1992-01-01

    On a conference (Gas for Europe in the 1990's) during the Gasexpo '91 the author held a speech of which the Dutch text is presented here. Attention is paid to the current European pricing methods (prices based on the costs of buying, transporting and distributing the natural gas and prices based on the market value, which is deducted from the prices of alternative fuels), and the transparency of the prices (lack of information on the way the prices are determined). Also attention is paid to the market signal transparency and gas-gas competition, which means a more or less free market of gas distribution. The risks of gas-to-gas competition for a long term price stability, investment policies and security of supply are discussed. Opposition against the Third Party Access (TPA), which is the program to implement gas-to-gas competition, is caused by the fear of natural gas companies for lower gas prices and lower profits. Finally attention is paid to government regulation and the activities of the European Commission (EC) in this matter. 1 fig., 6 ills., 1 tab

  18. Multi-market energy procurement for a large consumer using a risk-aversion procedure

    International Nuclear Information System (INIS)

    Zare, Kazem; Conejo, Antonio J.; Carrion, Miguel; Moghaddam, Mohsen Parsa

    2010-01-01

    This paper provides a technique to derive the bidding strategy in the day-ahead market of a large consumer that procures its electricity demand in both the day-ahead market and a subsequent adjustment market. Price uncertainty is modeled using concepts derived from information gap decision theory, which allows deriving robust decisions with respect to price volatility. Risk aversion is built implicitly within the proposed model. Correlations among prices in the day-ahead and the adjustment markets are properly modeled. The proposed technique is illustrated through a realistic case study. (author)

  19. Multi-market energy procurement for a large consumer using a risk-aversion procedure

    Energy Technology Data Exchange (ETDEWEB)

    Zare, Kazem [Tarbiat Modares University, Tehran, P.O. Box 14115-111 (Iran); Conejo, Antonio J. [Castilla-La Mancha University, Ciudad Real (Spain); Carrion, Miguel [Castilla-La Mancha University, Toledo (Spain); Moghaddam, Mohsen Parsa [Tarbiat Modares University, Tehran (Iran)

    2010-01-15

    This paper provides a technique to derive the bidding strategy in the day-ahead market of a large consumer that procures its electricity demand in both the day-ahead market and a subsequent adjustment market. Price uncertainty is modeled using concepts derived from information gap decision theory, which allows deriving robust decisions with respect to price volatility. Risk aversion is built implicitly within the proposed model. Correlations among prices in the day-ahead and the adjustment markets are properly modeled. The proposed technique is illustrated through a realistic case study. (author)

  20. Price increase

    CERN Multimedia

    2006-01-01

    Please take note that after five years of stable prices at Restaurant No 1 a price increase will come into force on 1st January 2006. This increase has been agreed after discussions between the CSR (Comité de Surveillance des Restaurants) and the catering company Novae and will reflect the inflation rate of the last few years. In addition, a new children's menu will be introduced, as well as 'Max Havelaar' fair-trade coffee at a price of 1.70 CHF.

  1. Price increase

    CERN Multimedia

    2005-01-01

    Please take note that after five years of stable prices at Restaurant No 1 a price increase will come into force on 1st January 2006. This increase has been agreed after discussions between the CSR (Comité de Surveillance des Restaurants) and the catering company Novae and will reflect the inflation rate of the last few years. In addition, a new children's menu will be introduced as well as 'Max Havelaar' fair-trade coffee at a price of 1.70 CHF.

  2. Freemium Pricing

    DEFF Research Database (Denmark)

    Runge, Julian; Wagner, Stefan; Claussen, Jörg

    Firms commonly run field experiments to improve their freemium pricing schemes. However, they often lack a framework for analysis that goes beyond directly measurable outcomes and focuses on longer term profit. We aim to fill this gap by structuring existing knowledge on freemium pricing...... into a stylized framework. We apply the proposed framework in the analysis of a field experiment that contrasts three variations of a freemium pricing scheme and comprises about 300,000 users of a software application. Our findings indicate that a reduction of free product features increases conversion as well...... as viral activity, but reduces usage – which is in line with the framework’s predictions. Additional back-of-the-envelope profit estimations suggest that managers were overly optimistic about positive externalities from usage and viral activity in their choice of pricing scheme, leading them to give too...

  3. Petroleum price

    International Nuclear Information System (INIS)

    Maurice, J.

    2001-01-01

    The oil market is the most volatile of all markets, with the exception of the Nasdaq. It is also the biggest commodity market in the world. Therefore one cannot avoid forecasting oil prices, nor can one expect to avoid the forecasting errors that have been made in the past. In his report, Joel Maurice draws a distinction between the short term and the medium-long term in analysing the outlook for oil prices. (author)

  4. Pro short-term procurement - Broker/trader

    International Nuclear Information System (INIS)

    Hoellen, E.E.

    1990-01-01

    The author presents his opinion on the issue of short-term versus long-term procurement of uranium and enrichment and the impact on reliability of supply. The progression of the market has been one of increasing commoditization. Utility buyers have moved towards purchasing uranium on the spot market and linking long-term contracts to spot-market pricing. There is some logic to the argument that utilities and the industry in general would be best served by this approach. Inventories would be worked off much more quickly, and unnecessary supply would be shut off until prices recovered to profitable levels. The result would be a healthier market with no detriment to the reliability of supply

  5. Selection of procurement systems in the South African construction industry: An exploratory study

    Directory of Open Access Journals (Sweden)

    W. D. Thwala

    2012-12-01

    Full Text Available Purpose of this paper: Procurement systems are vital in ensuring the successful implementation of construction projects precisely in all the phases of any particular project. Therefore, this paper aims to investigate in a systematic manner the factors that influence the selection of a procurement system in the South African construction industry. Research methodology: An extensive theory and literature review of procurement systems was conducted. The literature reviewed included a sample of case studies of procurement systems successfully implemented in completed building and civil engineering projects in South Africa. A questionnaire using a four-round Delphi survey method was used to conduct the empirical study in order to obtain participants' opinions about factors influencing the selection of procurement systems as well as the utility value of various procurement systems on each factor as identified. Finally, data analysis of both qualitative and quantitative techniques was performed using the Statistical Package for Social Sciences (SPSS. Findings: After qualitative analysis, findings of the literature reviewed suggest that factors that influence the selection of procurement systems cut across all the phases of the project as identified in this paper. Therefore, these factors are categorically classified into internal and external factors. Factors from the internal environment were further classified into client characteristics and project characteristics, with client characteristics comprising of variables such as clients' level of knowledge and control, political and social consideration, familiarity of procurement systems, competition, funding arrangement, government public/private sector projects and risk allocation whereas project characteristics comprise of factors (variables such as size and technical complexity of the project, influence of the project life cycle, expedited project delivery, time, quality and price certainty. Factors

  6. Experience with the source evaluation board method of procuring technical components for the Fermilab Main Injector

    International Nuclear Information System (INIS)

    Harding, D.J.; Collins, J.P.; Kobliska, G.R.; Chester, N.S.; Pewitt, E.G.; Fowler, W.B.

    1993-01-01

    Fermilab has adopted the Source Evaluation Board (SEB) method for procuring certain major technical components of the Fermilab Main Injector. The SEB procedure is designed to ensure the efficient and effective expenditure of Government funds at the same time that it optimizes the opportunity for attainment of project objectives. A qualitative trade-off is allowed between price and technical factors. The process involves a large amount of work and is only justified for a very limited number of procurements. Fermilab has gained experience with the SEB process in awarding subcontracts for major subassemblies of the Fermilab Main Injector dipoles

  7. PROCUREMENT IN THE SUPPLY CHAIN: AN ELEMENT OF HOTEL PRODUCT COMPETITIVENESS

    Directory of Open Access Journals (Sweden)

    Edna Mrnjavac

    2016-12-01

    organization is essential for the application of the supply-chain principles, but it can also have the opposite effect. The principles of supply chain organization and management are present in all investigated hotels, but to varying degrees. While obtaining the lowest price is singled out as the primary goal of procurement, the need to take into account other elements, such as the quality of procurement, products and services, is also emphasized because this makes it possible to create a hotel product that guests will be satisfied with. Conclusion: The presence of supply-chain elements in hotel procurement correlates with the size of the hotel enterprise, but not with the type of hotel or its location (type of tourist destination. The organizational basis of stand-alone hotels is better suited for the development of supply chains. Their less-formal business organization and decentralized procurement provide a suitable environment for focusing on and effectively managing the business process to enhance product quality. In contrast, centralized procurement embedded in the more rigid organization of hotel enterprises contains a number of barriers that go against the supply chain concept. Partly for this reason, the primary goal of hotel enterprises is price, while quality is only a secondary goal. Networked supply-chain structures are present in both cases, and high on the list of procurement goals is the importance of building sound relationships with prominent suppliers. Also important is that procurement organized in this way focuses on the long term; the supplier market and procurement terms are analyzed periodically and, if necessary, changes are made regarding suppliers and supplier relationships.

  8. Bioanalysis, metabolism & clinical pharmacology of antiretroviral drugs

    NARCIS (Netherlands)

    Heine, R. ter

    2009-01-01

    The aims of all studies described in this thesis were to develop new bioanalytical and more patient friendly methods for studying the clinical pharmacology of antiretroviral drugs and to ultimately improve antiretroviral treatment.

  9. Analysis of the Impact of Transparency, Corruption, Openness in Competition and Tender Procedures on Public Procurement in the Czech Republic

    Directory of Open Access Journals (Sweden)

    František Ochrana

    2014-01-01

    Full Text Available This study analyses the impact of transparency and openness to competition in public procurement in the Czech Republic. The problems of the Czech procurement market have been demonstrated on the analysis of a sample of contracts awarded by local government entities. From among a set of factors influencing the efficiency of public procurement, we closely analyse transparency, resilience against corruption, openness, effective administrative award procedure, and formulation of appropriate evaluation criteria for selecting the most suitable bid. Some assumptions were confirmed, including a positive effect of open procedures on the level of competition on the supply side as well as the dominant use of price criteria only. The latter case is probably often caused by low skills of workers at the contracting entities, as well as the lack of resources in public budgets. However, we have to reject the persistent legend of “undershooting” tender prices and subsequently increasing the final prices of public contracts. Increases of final prices are very limited. Based on the results of the analyses presented, we argue that the main problem of the Czech public procurement market lies in a rather low competence of administrators who are not able to use non-price criteria more often.

  10. Marketplace pricing

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    As discussed in this chapter, interest in marketplace pricing has been increasing in recent years, reflecting the societal trend toward substituting competition for regulation where appropriate. Competition is valuable because it encourages utilities to make efficient decisions with a minimum of regulatory intervention. It enhances efficiency through the incentive for innovation by the regulated companies and by increasing the likelihood they will come forward with proposals for better services, lower prices or both. Ultimately, consumers are beneficiaries. Marketplace pricing is emblematic of the view that the degree of regulation should reflect the degree of market power, that workably competitive markets should be allowed to operate with as little regulatory interference as possible. The Edison Electric Institute has made perhaps the most detailed proposal on marketplace pricing. It and others perceive numerous benefits from this method of pricing transmission services. Given the undeniable market power resulting from line ownership, FERC has emphasized the need to find a workably competitive market before approving such proposals. The ability to make this distinction without a full-blown antitrust review for every transaction is questionable, and FERC has yet to provide generic guidance. Finally, FERC's legal ability to depart from cost-based standards is questionable

  11. Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction

    Science.gov (United States)

    Trusaji, Wildan; Akbar, Muhammad; Sukoyo; Irianto, Dradjad

    2018-03-01

    In making bearing procurement analysis, price and its reliability must be considered as decision criteria, since price determines the direct cost as acquisition cost and reliability of bearing determine the indirect cost such as maintenance cost. Despite the indirect cost is hard to identify and measured, it has high contribution to overall cost that will be incurred. So, the indirect cost of reliability must be considered when making bearing procurement analysis. This paper tries to explain bearing evaluation method with the total cost of ownership analysis to consider price and maintenance cost as decision criteria. Furthermore, since there is a lack of failure data when bearing evaluation phase is conducted, reliability prediction method is used to predict bearing reliability from its dynamic load rating parameter. With this method, bearing with a higher price but has higher reliability is preferable for long-term planning. But for short-term planning the cheaper one but has lower reliability is preferable. This contextuality can give rise to conflict between stakeholders. Thus, the planning horizon needs to be agreed by all stakeholder before making a procurement decision.

  12. Electricity pricing

    International Nuclear Information System (INIS)

    Wijayatunga, P.D.C.

    1994-01-01

    Electricity pricing in most countries, especially in the developing world, has been determined by traditional accounting criteria where it raises revenue requirements to cover the operating costs and a return on past and future capital investments in possible power systems. The use of economic principles to improve the total economic efficiency in the electricity industry is discussed. Basic marginal cost theory, long run marginal costing (LRMC) cost categories and rating periods, marginal capacity costs, marginal energy costs, consumer costs, short run marginal costing (SRMC), marginal cost of fuel, marginal cost of network losses, market clearing price, value of unserved energy and network quality of supply cost are discussed

  13. Ethics and regulation in organ procurement research.

    Science.gov (United States)

    Ackerman, Terrence F; Winsett, Rebecca P

    2002-12-01

    This article explores the role of ethics and regulation in human research conducted by organ procurement agencies; basic ethical principles for human research are outlined. Organ procurement agencies are not required to observe federal regulations; however, voluntary adherence will ensure that procurement research is conducted according to current standards of ethical practice. Although most organ procurement research will qualify for exempt status, this determination should be made by an institutional review board. Even if studies qualify for exempt status, there is a moral presumption that informed consent should be sought, unless certain narrow conditions for waiver of consent are satisfied. Finally, when future research utilizing organ procurement records is anticipated, procurement coordinators should provide sufficiently detailed information to families about such plans to permit their advance informed consent to research activities.

  14. Access to antiretroviral drugs and AIDS management in Senegal.

    Science.gov (United States)

    Desclaux, Alice; Ciss, Mounirou; Taverne, Bernard; Sow, Papa S; Egrot, Marc; Faye, Mame A; Lanièce, Isabelle; Sylla, Omar; Delaporte, Eric; Ndoye, Ibrahima

    2003-07-01

    Description and analysis of the Senegalese Antiretroviral Drug Access Initiative (ISAARV), the first governmental highly active antiretroviral therapy (HAART) treatment programme in Africa, launched in 1998. ISAARV was initially an experimental project designed to evaluate the feasibility, efficacy and acceptability of HAART in an African context. It was based on four principles: collective definition of the strategy, with involvement of the health professionals who would be called on to execute the programme; matching the objectives to available means (gradual enrollment according to drug availability); monitoring by several research programmes; and ongoing adaptation of treatment and follow-up according to the latest international recommendations. Persons qualifying for antiretroviral (ARV) therapy are selected on the basis of immunological and clinical criteria, regardless of economic and social considerations. A system of subsidies was created to favor access to ARV. Following the ARV price reductions that occurred in November 2000, 100% subsidies were created for the poorest participants. Optimal adherence was ensured by monthly follow-up by pharmacists and support groups held by social workers and patient associations. The chosen supply and distribution system allowed drug dispensing to be strictly controlled. The ISAARV programme demonstrates that HAART can be successfully prescribed in Africa. This experience has served as the basis for the creation of a national treatment programme in Senegal planned to treat 7000 patients by 2006.

  15. Evolution in public procurement and the impact of e-procurement platforms: A case study

    OpenAIRE

    Leal, Pedro Manuel Mariano

    2010-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics The aim of this project is to understand the evolution that occurred in the public procurement due to the new Public Contracts Code that changed the procurement procedures and forced public entities to use electronic procurement platforms. This work is a contribution to the understanding of the main procurement changes with this ...

  16. Services procurement under the WTO’s agreement on government procurement: whither market access?

    OpenAIRE

    Shingal, Anirudh

    2010-01-01

    This paper studies the government procurement of services from foreign suppliers by conducting a statistical analysis of data submitted by Japan and Switzerland to the WTO's Committee on Government Procurement. Using several metrics, the paper examines if the WTO’s Agreement on Government Procurement (GPA) has led to greater market access for foreign suppliers in services procurement. Our results indicate that despite the GPA, the proportions of services contracts awarded to foreigners have d...

  17. Infrastructure procurement skills gap amongst procurement personnel in Nigeria’s public sector

    OpenAIRE

    Mahamadu, A.-M. ed; Manu, P.; Booth, C.; Olomolaiye, P.; Coker, A.; Ibrahim, A. ed; Lamond, J.

    2018-01-01

    Purpose - Procurement of public infrastructure that is fit for purpose partly depends on the competencies of procurement personnel. In many developing countries in Sub-Saharan Africa, including Nigeria, there is a deficit in the quantity and quality of infrastructure and their procurement is further riddled with deficiencies in the capacity of public procuring entities. It is, however, unclear from the extant literature, what are the critical skills development needs of public personnel invol...

  18. Information Technology Procurement Authorization (ITPA) Tracking System

    Data.gov (United States)

    Office of Personnel Management — Information Technology Procurement Authorization (ITPA) Tracking System is used for gathering consistent data from U.S. Office of Personnel Management (OPM) program...

  19. Contracting Out Government Procurement Functions: An Analysis

    National Research Council Canada - National Science Library

    Lamm, David; Yoder, Cory

    2008-01-01

    ...)), asked the Naval Postgraduate School (NPS) to analyze the contracting out of procurement functions currently being accomplished by Navy, Marine Corps, and other Department of Defense (DOD) Activities...

  20. The International Experience in Public Procurement

    Directory of Open Access Journals (Sweden)

    Pysmenna Mariia S.

    2017-11-01

    Full Text Available The article is aimed at generalizing the foreign experience of implementing public procurement, analyzing peculiarities of organizational, normative and procedural provision of public procurement in the Member States of the European Union. The relevance of the research topic is due to the need to harmonize the procurement policy of the Government of Ukraine with the international legal framework and with broad political objectives within the European integration strategy. The organizational framework and principles of implementing public procurement in the EU Member States were analyzed. Special attention was paid to normative provision of public procurement by the EU Member States; peculiarities of the use of national or harmonized rules of public procurement in accordance with the amount of the procurement contract; restrictions and conditions for public authorities in the selection of applicants for bidding. Five types of public procurement procedures used in the EU have been characterized, namely: open procedure, limited procedure, negotiation procedure, competitive dialog, electronic auctions. The need to address the social and legal aspects of public procurement in international practice has been substantiated and the possibilities for resolving these problems have been presented.

  1. Risk Management in Public Procurement Process

    Directory of Open Access Journals (Sweden)

    Ioana Manea

    2010-12-01

    Full Text Available Public procurement represents an important part of the current economy reality. Throughout the procurement process, due to the effect of the interaction among the components of the public procurement system, certain actions with significant negative effects on its optimal operation may occur. Risks may turn into certainty either because of a simple error in the development and administration of the procurement process, or because of a deliberate deviation from the existing legal provisions. Therefore, there is an imperative for the implementation of certain risk-avoiding measures, as well as of measures aiming to reduce their negative effects in case of their occurrence.

  2. When to start antiretroviral therapy

    DEFF Research Database (Denmark)

    Lundgren, Jens D; Babiker, Abdel G; Gordin, Fred M

    2013-01-01

    Strategies for use of antiretroviral therapy (ART) have traditionally focused on providing treatment to persons who stand to benefit immediately from initiating the therapy. There is global consensus that any HIV+ person with CD4 counts less than 350 cells/μl should initiate ART. However, it rema...

  3. PUBLIC PROCUREMENT SYSTEM IN RUSSIA

    Directory of Open Access Journals (Sweden)

    Alla V. Trofimovskaya

    2013-01-01

    Full Text Available This article contains information on the theoretical-methodological research of the Institute of public procurement. The focus is on the consideration of the implementation of the priority tasks for the state contract system and the role in their solving that regional level of management can play. Opportunities in the sphere of state regulation, that Moscow, as the subject of the Federation, has, are educed in the article. The problem of transformation the existing contractual mechanisms for the formation of the model of public contract system, is studied.

  4. International overview of hospital procurement.

    Science.gov (United States)

    Ferrier, Maud; Lariviere, David; Laurent, Claire; Roque, Eric

    2011-01-01

    This article was written by four French hospital director students at the Ecole des Hautes Etudes en Santé Publique (EHESP-School of Public Health) from a study conducted jointly with students at the Grenoble School of Management to present an international overview of hospital procurement methods in ten countries. An analysis of these methods showed that there was a general trend towards group purchasing, with some common aims in terms of costs and performance and some differences in legislation (competition), size of the public sector and centralization or decentralization.

  5. Price projections of feedstocks for biofuels and biopower in the U.S

    International Nuclear Information System (INIS)

    Langholtz, Matthew; Graham, Robin; Eaton, Laurence; Perlack, Robert; Hellwinkel, Chad; De La Torre Ugarte, Daniel G.

    2012-01-01

    The economic availability of biomass resources is a critical component in evaluating the commercial viability of biofuels. To evaluate projected farmgate prices and grower payments needed to procure 295 million dry Mg (325 million dry tons) of biomass in the U.S. by 2022, this research employs POLYSYS, an economic model of the U.S. agriculture sector. A price-run simulation suggests that a farmgate price of $58.42 Mg −1 ($53.00 dry ton −1 ) is needed to procure this supply, while a demand-run simulation suggests that prices of $34.56 and $71.61 Mg −1 ($30.00 and $62.00 dry ton −1 ) in are needed in 2012 and 2022, respectively, to procure the same supply, under baseline yield assumptions. Grower payments are reported as farmgate price minus resource-specific harvest costs. - Highlights: ► We model biomass prices needed to meet projected demand for biofuels and biopower. ► Combined projected demand is 295 million dry Mg of biomass by 2022. ► A farmgate price of $58.42 Mg −1 in 2022 meets demand under a price-run scenario. ► A farmgate price of $71.61 Mg −1 in 2022 meets demand under a demand-run scenario. ► Higher farmgate prices incentivize adoption of dedicated crops.

  6. 48 CFR 752.225-71 - Local procurement.

    Science.gov (United States)

    2010-10-01

    ... 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods... currency of the cooperating country. (b) All locally-financed procurements must be covered by source/origin...

  7. Economic theory and the application of incentive contracts to procure operating reserves

    International Nuclear Information System (INIS)

    Wang, L.; Yu, C.W.; Wen, F.S.

    2007-01-01

    The ancillary services market plays an important role in the operation of an electricity market, especially for achieving a high level of reliability. Among all ancillary services, operating reserve is an important research focus, with the attention mainly on the optional procurement and pricing methods. These methods differ in many aspects, including the objective, allocation of risks, and feasibility. In this paper, a new approach is proposed to analyze the users' reserve procurement problem and a novel reserve trade mechanism is developed between electricity users and the retailer of the market. First, the differences between the procurement of operating reserve in decentralized and centralized ways are analyzed. The comparison of the equilibrium solutions reveals that the centralized procurement that results in a systemic optimal solution is better than the decentralized procurement that results in a Nash equilibrium solution. Furthermore, an incentive contract based on a Principal-agent model, that is able to induce a systemic optimality as well as a Pareto equilibrium and manage risks at the same time is designed. The proposed model is equitable and beneficial to all participants. An example is served to illustrate the features of the model and the methodology. (author)

  8. public procurement, governance and economic growth

    African Journals Online (AJOL)

    GRACE

    (2003: 2), ―strong procurement management in the public sector is a tool for achieving political, economic and social goals‖. Thus .... professionalism in the public sector procurement system (Section 4, PPA, 2007). The functions and powers of the ..... K., Bose, N. and Haque, M.E. (2004). Public Expenditures, Bureaucratic.

  9. 75 FR 47550 - Procurement List; Additions

    Science.gov (United States)

    2010-08-06

    ...--Macintosh Apple NSN: MR 473--Fresh Linen NPA: Industries for the Blind, Inc., West Allis, WI Contracting... Service, 5777 S. Aviation Blvd., N. Charleston, SC NPA: Goodwill Industries of Lower South Carolina, Inc... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be...

  10. 75 FR 22745 - Procurement List Additions

    Science.gov (United States)

    2010-04-30

    ... General Services Administration. Services Service Type/Location: Laundry Services, Alaska VA Healthcare... Procurement List. SUMMARY: This action adds to the Procurement List products and services to be furnished by... concerning capability of qualified nonprofit agencies to provide the products and services and impact of the...

  11. 76 FR 80345 - Procurement List; Additions

    Science.gov (United States)

    2011-12-23

    ... ARMY, W6QL ECC MIAMI DIV, MIAMI, FL. Service Type/Location: Industrial Laundry Service, Bureau of... Procurement List. SUMMARY: This action adds services to the Procurement List that will be provided by... concerning capability of qualified nonprofit agencies to provide the services and impact of the additions on...

  12. 78 FR 48656 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-08-09

    ... Oceanic and Atmospheric Administration, Boulder, CO. Service Type/Location: Laundry Service, US Coast... Additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the... required to procure the products and services listed below from nonprofit agencies employing persons who...

  13. 77 FR 27736 - Procurement List Additions

    Science.gov (United States)

    2012-05-11

    ... Research Laboratory, Washington, DC. Service Type/Location: Laundry, Refurbishment, and Warehouse Services... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be... products and services and impact of the additions on the current or most recent contractors, the Committee...

  14. 77 FR 29596 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-05-18

    .../Location: Laundry Service, Veterans Administration Medical Center (VAMC), (offsite: 1809 W 2nd Avenue... Additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the... identified in this notice will be required to procure the products and services listed below from nonprofit...

  15. 75 FR 14576 - Procurement List Additions

    Science.gov (United States)

    2010-03-26

    ... Inspection Service, Minneapolis, MN. M.R. Laundry Products NSN: MR 1103--Heavy Duty Laundry Bag. NSN: MR 1104... procurement list. SUMMARY: This action adds to the Procurement List products and services to be furnished by... products and services and impact of the additions on the current or most recent contractors, the Committee...

  16. 22 CFR 226.44 - Procurement procedures.

    Science.gov (United States)

    2010-04-01

    ... Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.44 Procurement procedures. (a... and assistance, as appropriate, of such organizations as the Small Business Administration and the...

  17. 42 CFR 457.940 - Procurement standards.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Procurement standards. 457.940 Section 457.940... Integrity § 457.940 Procurement standards. (a) A State must submit to CMS a written assurance that title XXI... public or private payment rates for comparable services for comparable populations, consistent with...

  18. International Research Study of Public Procurement

    NARCIS (Netherlands)

    Telgen, Jan; Harland, C.; Callender, G.; Harland, C.; Nassimbeni, G.; Schneller, E.

    2012-01-01

    In this chapter we examine the specific issue of public procurement, its importance to local, regional, national, and international economies as evidenced in a unique international comparative research study – the International Research Study of Public Procurement (IRSPP). First the public

  19. 7 CFR 210.21 - Procurement.

    Science.gov (United States)

    2010-01-01

    ... Responsibilities § 210.21 Procurement. (a) General. State agencies and school food authorities shall comply with... violation of law are to be referred to the local, State, or Federal authority that has proper jurisdiction... title are followed. A school food authority may use its own procurement procedures which reflect...

  20. 7 CFR 220.16 - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ... nature. Matters concerning violation of law are to be referred to the local, State or Federal authority... § 3016.60(b) and (c) of this title are followed. The school food authority may use its own procurement procedures which reflect applicable State and local laws and regulations, provided that procurements made...

  1. 78 FR 45183 - Procurement List Additions

    Science.gov (United States)

    2013-07-26

    ... Requirement as aggregated by the General Services Administration. NSN: 7920-00-NIB-0564--Towel, Cleaning, Non... Procurement List. SUMMARY: This action adds a products and services to the Procurement List that will be... presented to it concerning capability of qualified nonprofit agencies to provide the products and services...

  2. How does procurement capability maturity affect e-Procurement adoption and leverage purchasing in supply chain

    Directory of Open Access Journals (Sweden)

    Pongpanga Pongsuwan

    2016-11-01

    Full Text Available This study refers to the research model of Batenburg (2008 which defined procurement functions to six maturity dimensions; strategy, processes, control, organization, information, e-Technology as the starting point and indicates twenty two items to support capability maturity measurement which is called “Procurement Competitive Capability Maturity”(PCCM. This model is used for a company to assess current practices of procurement function and perceives the level of its capabilities. The data collection is from a survey of fifty-two selected procurement organizations in Southeast Asia (SEA countries; from Thailand, Vietnam, Philippines, Indonesia, Malaysia and Singapore. The objective of this study is to demonstrate the significant value of industry type, size of spending and centralized/decentralized procurement that affect procurement capability maturity. The results show that the industry has no relation to the capability maturity; the size of procurement spend has a positive relation to the capability maturity; and the centralized procurement has higher capability maturity than the decentralized. Moreover, this study extends the knowledge of e-Procurement and digital context to leverage procurement processes and visible procurement integration in an organization and across the supply chain.

  3. The transition to flexible, sales-oriented procurement: new paradigms for gas distribution; Der Uebergang zur vertriebsorientierten strukturierten Beschaffung. Neue Paradigmen fuer den Gasvertrieb

    Energy Technology Data Exchange (ETDEWEB)

    Alkadi, Ari [energie quader GmbH, Darmstadt (Germany); Bollheimer, Thomas [Stadtwerke Frankental GmbH, Frankenthal (Germany)

    2011-05-15

    Gas-to-gas competition is hitting public utilities with vehemence. In the past only newcomers and independent dealers profited from prices in the trading markets. Now public utilities have also begun to adopt flexible gas procurement policies. This article uses the example of Stadtwerke Frankenthal GmbH (SWiFT) to illustrate the transition to a flexible procurement policy and outline the new paradigms involved.

  4. Measuring effects of public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Underway for quite some time now has been the discussion on using public procurement as a means to stimulate innovation. However - with some exceptions this has been mainly a conceptual discussion vastly surpassed a corresponding development of appropriate monitoring tools. Also, even if both...... qualitative and quantitative studies have been made, they tend to lack connection to the underlying mechanisms envisaged in the conceptual and/or case based literature. A challenge in this endeavour prevails in the nature of how public procurement of innovation works. Some of the effects rendered may...... about the usefulness of public procurement of innovation are at all realistic and feasible in practice. After reviewing different currently available means to measure both public procurement of innovation measures, as well as public procurement of innovation, the paper outlines a case-based approach...

  5. Public Procurement of Innovation as Endogenous

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Public procurement used as an innovation policy instrument has attracted attention the last decade. It has been argued that public procurement can be used to stimulate innovation from the demand-side. This paper problematizes ‘demand’ understood as a problem defined by a public procurer given...... to potential suppliers to solve. By drawing on a cross-case analysis of two similar projects the paper attempts to explicate an understanding of the role of public procurement of innovation not primarily as a ‘demand-side innovation instrument’, as such thinking might run the risk of ignoring important...... underlying mechanisms critical for success. Instead the paper views public procurement of innovation as an instrument of endogenous- exogenous knowledge conversion....

  6. ONLINE PROCUREMENT IN SME`s

    Directory of Open Access Journals (Sweden)

    Daniela ICHIM

    2017-12-01

    Full Text Available E-Marketplaces are new business places for buying, selling products and services in many industries to support customers. The emergence of business-to-business (B2B in the online environment has opened up opportunities for effective online transactions between businesses. Research in this area is not enough to offer only fragmented perspectives in this area. Therefore, the targeted research problem was designed to investigate how business performance of online B2B purchases can be analyzed. The proposed study focuses on the online procurement in. Specifically, they try to answer questions such as: Does site, product, and vendor characteristics affect the online procurement in? Does online buying experience influence online procurement by? Participants are that use the Internet to procure products or services. Study respondents were SME managers who believe that online procurement will save time, money and effort, reducing costs.

  7. Decentralized Procurement in Light of Strategic Inventories

    DEFF Research Database (Denmark)

    Frimor, Hans; Arya, Anil; Mittendorf, Brian

    2015-01-01

    The centralization versus decentralization choice is perhaps the quintessential organizational structure decision. In the operations realm, this choice is particularly critical when it comes to the procurement function. Why firms may opt to decentralize procurement has been often studied and conf......The centralization versus decentralization choice is perhaps the quintessential organizational structure decision. In the operations realm, this choice is particularly critical when it comes to the procurement function. Why firms may opt to decentralize procurement has been often studied...... and confirmed to be a multifaceted choice. This paper complements existing studies by detailing the trade-offs in the centralization versus decentralization decision in light of firm's decision to cede procurement choices to its individual devisions can help moderate inventory levels and provide a natural salve...

  8. Sales analysis as a basis for optimising gas procurement; Absatzanalyse als Grundlage optimierter Gasbeschaffung

    Energy Technology Data Exchange (ETDEWEB)

    Jungblut, Ralf [RWE Vertrieb AG, Dortmund (Germany). Produktmanagement, Marketing und Datenmanagement

    2012-01-15

    German energy suppliers are finding themselves in an increasingly difficult situation in the gas market. With the natural gas glut subsiding and global demand picking up, gas prices are expected to rise over the long term. Counter to the global trend, gas demand in Germany is expected to decrease. Furthermore, short-term fluctuations in economic activity with a potential for impacting on the demand for and price level of natural gas may pose significant economic risks. A detailed knowledge of one's own sales portfolio is therefore extremely important when it comes to gas procurement.

  9. Human resources needs for universal access to antiretroviral therapy in South Africa: a time and motion study

    NARCIS (Netherlands)

    Hontelez, J.A.C.; Newell, M.L.; Bland, R.M.; Munnelly, K.; Lessells, R.J.; Barnighausen, T.

    2012-01-01

    ABSTRACT: BACKGROUND: Although access to life-saving treatment for patients infected with HIV patients in South Africa has improved substantially since 2004, treating all eligible patients (universal access) remains elusive. As the prices of antiretroviral drugs have dropped over the past years,

  10. Framework for Structuring Procurement Contracts

    Directory of Open Access Journals (Sweden)

    Lena Borg

    2014-12-01

    Full Text Available The aim of this paper is to propose a new framework for structuring contract types and payment methods. Concerning procurement contracts, the first important new feature of this framework is a stepwise structure with three main steps in the contract design: (1 what will be procured—should the contract only include construction, or should it include both construction and operation/maintenance (2 who will do the detailed design of the premise and (3 how many contractors will the client use? The second important new feature of this framework is that both step 2 and step 3 include a continuum of alternatives. Concerning payment methods, the new framework is primarily based on how the specific risks of the project are shared. These frameworks can be useful for policy formulation in that they can help to avoid some problematic ways of formulating policies.

  11. Traditional Procurement is too Slow

    Directory of Open Access Journals (Sweden)

    Ann Kong

    2012-11-01

    Full Text Available This paper reports on an exploratory interview survey of construction project participants aimed at identifying the reasons for the decrease in use of the traditional, lump-sum, procurement system in Malaysia. The results show that most people believe it is too slow. This appears to be in part due to the contiguous nature of the various phase and stages of the process and especially the separation of the design and construction phases. The delays caused by disputes between the various parties are also seen as a contributory factor - the most prominent cause being the frequency of variations, with design and scope changes being a particular source of discontent. It is concluded that an up scaling of the whole of the time related reward/penalty system may be the most appropriate measure for the practice in future.

  12. Impact of price deregulation policy on the affordability of essential medicines for women's health: a panel data analysis.

    Science.gov (United States)

    Liu, Junjie; Wang, Liming; Liu, Chenxi; Zhang, Xinping

    2017-12-01

    A new policy which required deregulation on prices of off-patent medicines for women's health during procurement was introduced in China in September 2015. The current study examines this policy's impact on the affordability of essential medicines for women's health. Based on product-level panel data, a fixed effect regression model is employed by using procurement records from Hubei Centralist Tender for Drug Purchase platform. In the model, Affordability was measured with prices. The Competition consists of two parts: generic competition and therapeutic class competition which are measured with generic competitors and therapeutic substitutes. Instrument variable is used to deal with endogeneity. The policy helped control prices of essential medicines for women's health. Generic competition helped control prices, however, therapeutic class competition caused higher prices. The new policy helped enhance the affordability of essential medicines for women's health as expected, which provides empirical evidence on price deregulation. Besides, generic competition is important in price control despite strict regulatory system in China.

  13. World uranium resources and Japan's status on its procurement

    International Nuclear Information System (INIS)

    Imaizumi, Tsunemasa

    1979-01-01

    The features of uranium are that it is not versatile in use, that its substitutes as nuclear fuel cannot be found, that it cannot be used as fuel unless the processing is made, that it has the nuclear fission property, and that there is some time limit in its value. Therefore uranium lacks charm as the object of resource industries. The market of uranium started as military procurement, and its effects still remain now in some extent. Many mines were closed when the oversupply and the rapid drop of price of uranium occurred once, and such fear is felt even now. The relationship between the suppliers and the consumers of uranium is one to one correspondence, accordingly the mutual cooperation is necessary. One problem is that the intervention by governments into uranium market is unavoidable. In order to bring up the sound and stable market, the obstructing factors must be eliminated. The uranium resources in the free world are about 4.4 million tons. The import of uranium resources is carried out according to the long term procurement contracts. For the consumer countries, there are the risk of embargo, the problems related to the cartel, and the restriction based on nuclear non-proliferation. The trade by establishing the multi-lateral organization, the independent development of foreign mines, and the exploration of resources in Japan are discussed. (Kako, I.)

  14. Environmental Criteria in the Spanish Public Works Procurement Process

    Directory of Open Access Journals (Sweden)

    José Luis Fuentes-Bargues

    2017-02-01

    Full Text Available Green Public Procurement (GPP is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group of countries, known as “Green 7”, in the European Union. Environmental criteria is the fourth criterion in importance, but its weight in the global of the process is much lower than other criteria such as price, memory of the construction process and the delivery time. National administrations use environmental criteria more frequently because they have more resources and staff training about environmental issues. Environmental criteria are more used in the tendering of civil projects and works whose budget exceeds ten million euro due to the environmental impact of these kind and/or size of projects.

  15. Towards the procurement of the ITER divertor

    International Nuclear Information System (INIS)

    Merola, M.; Tivey, R.; Martin, A.; Pick, M.

    2006-01-01

    The procurement of the ITER divertor is planned to start in 2009. On the basis of the present common understanding of the sharing of the ITER components, the Japanese Participating Team (JAPT) will supply the outer vertical target, the Russian Federation (RF) PT the dome liner and will perform the high heat flux testing, the EU PT will supply the inner vertical targets and the cassette bodies, including final assembly of the divertor plasma-facing components (PFCs). The manufacturing of the PFCs of the ITER divertor represents a challenging endeavor due to the high technologies which are involved, and due to the unprecedented series production. To mitigate the associated risks, special arrangements need to be put in place prior to and during procurement to ensure quality and to keep to the time schedule. Before procurement can start, an ITER review of the qualification and production capability of each candidate PT is planned. Well in advance of the assumed start of the procurement, each PT which would like to contribute to the divertor PFC procurement, should first demonstrate its technical qualification to carry out the procurement with the required quality, and in an efficient and timely manner. Appropriate precautions, like subdivision of the procurement into stages, are also to be adopted during the procurement phase to mitigate the consequences of possible unexpected manufacturing problems. In preparation for writing the procurement specification for the vertical targets, the topic of setting acceptance criteria is also being addressed. This activity has the objective of defining workable acceptance criteria for the PFC armour joints. A complete set of analyses is also in progress to assess the latest design modifications against the design requirements. This task includes neutronic, shielding, thermo-mechanical and electromagnetic analyses. More than half of the ITER plasma parameters that must be measured and the related diagnostics are located in the

  16. Energy prices and taxes

    International Nuclear Information System (INIS)

    2004-01-01

    Energy Prices and Taxes contains a major international compilation of energy prices at all market levels: import prices, industry prices and consumer prices. The statistics cover main petroleum products, gas, coal and electricity, giving for imported products an average price both for importing country and country of origin. Every issue includes full notes on sources and methods and a description of price mechanisms in each country

  17. MARKET ECONOMICS PRICING PARTICULARS

    Directory of Open Access Journals (Sweden)

    V. I. Parshin

    2011-01-01

    Full Text Available The price performs several economic functions: accounting, stimulation, distribution, demand and offer balancing, serving as production site rational choice criterion, information. Most important pricing principles are: price scientific and purpose-aimed substantiation, single pricing and price control process. Pricing process factors are external, internal, basic (independent on money-market, market-determined and controlling. Different pricing methods and models are to be examined, recommendations on practical application of those chosen are to be written.

  18. Mexico - The Federal Procurement System : Challenges and Opportunities

    OpenAIRE

    World Bank

    2007-01-01

    The World Bank carried out the first country procurement assessment review (CPAR) jointly with the Government in 2001, focusing on the features and performance of the federal procurement system. Based on the action plan included in the 2001 CPAR, the government reformed federal procurement laws and regulations in 2005 and furthered the development of Government Procurement Electronic Syste...

  19. 75 FR 49481 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2010-08-13

    ... added to the Procurement List: Services Service Type/Locations: Laundry Service, Atlanta VA Medical...: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities and deletes a service from the Procurement List previously furnished by such agency. DATES...

  20. 78 FR 21916 - Procurement List; Addition And Deletions

    Science.gov (United States)

    2013-04-12

    ..., the following service is added to the Procurement List: Service Service Type/Location: Laundry Service...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...

  1. 22 CFR 201.23 - Procurement under private sector procedures.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement under private sector procedures... § 201.23 Procurement under private sector procedures. (a) General requirements. Procurements under private sector procedures will normally be carried out by importers using negotiated procurement...

  2. Microeconomics of the Productivity, Price Indicators and Farm Incomes. Analytical Approach

    Directory of Open Access Journals (Sweden)

    Włodzimierz Rembisz

    2011-07-01

    Full Text Available The paper develops a farm producer behavior type model to analyze the impact of a input productivity and price change on farm incomes. The theoretical analysis shows the consequences of the balance between the increase of production factor prices and their productivity improvement in the condition of stable procurement price for the farm producers income. The cost effect of the production factors price increment and its neutralization by productivity (TFP-type growth is examined as well as some aspects of the inputs shares (returns and costs in the produce value. The article argues that labor input productivity as an endogenous factor, is an essential for farm incomes growth assuming the specified type of the farm producer utility function (its equations and variables as well as no the compensative procurement price change conditions. Some empirical evidence is attached however more work in that respect is foreseen.

  3. Local and Regional Food Aid Procurement: An Assessment of Experience in Africa and Elements of Good Donor Practice

    OpenAIRE

    Tschirley, David L.; del Castillo, Anne Marie

    2008-01-01

    This Policy Synthesis is a summary of a longer report that discusses the procurement of food aid within the country or region where it is needed. Referred to as local and regional procurement – LRP – this practice has become a major element in multilateral food aid response over the past decade1. The paper examines the relevance and the rationale for using LRP, reviews the efficiency of World Food Program (WFP) LRP activities in Africa relative to inkind food aid and to prices in the markets ...

  4. 78 FR 38953 - Procurement List Additions

    Science.gov (United States)

    2013-06-28

    ... Blind or Severely Disabled published notices of proposed additions to the Procurement List. After... Punch, Paper, Desktop, 3-Hole, Adjustable, 11 sheet capacity, Metallic Base, Black Grip. Coverage: A...

  5. 78 FR 12295 - Procurement List; Additions

    Science.gov (United States)

    2013-02-22

    ... published notices of proposed additions to the Procurement List. After consideration of the material..., 508 Compliant, 12 Digit, Portable, Desktop, Battery Operated NPA: MidWest Enterprises for the Blind...

  6. Standard Procurement System Use and User Satisfaction

    National Research Council Canada - National Science Library

    2001-01-01

    The audit was performed in response to concerns expressed by the Chairman, House of Representatives Committee on Budget that DoD was not effectively spending Federal funds to acquire the Standard Procurement System (SPS...

  7. Federal Procurement Data System - FPDS API

    Data.gov (United States)

    General Services Administration — The Federal Procurement Data System (FPDS) Next Generation has been re-engineered as a real-time federal enterprise information system. Web services based on SOAP...

  8. 78 FR 40727 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-07-08

    ... for addition to the Procurement List for production by the nonprofit agencies listed: Products Towel.... 12/BX Cleaner, Brake Parts NSN: 6850-01-167-0678--17 oz. NPA: The Lighthouse for the Blind, St. Louis...

  9. 78 FR 35874 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-06-14

    ... proposed for addition to the Procurement List for production by the nonprofit agencies listed: Products... Cleaner NPA: Winston-Salem Industries for the Blind, Inc., Winston-Salem, NC Contracting Activity: Defense...

  10. Industry Analysis for Body Armor Procurement

    National Research Council Canada - National Science Library

    Foust, Coleen; Jenson, Christopher

    2006-01-01

    .... In addition, the Office of Management and Budget has required that each agency create strategic sourcing initiatives, monitor the cost savings and report the results to the Office of Federal Procurement Policy...

  11. Turning the Kaleidoscope: Five Perspectives on Procurement

    DEFF Research Database (Denmark)

    Munkgaard Møller, Morten; Vammen, Søren

    Purpose of this paper The purpose of the paper is to provide a conceptual foundation to enhance the body of knowledge related to procurement and sourcing through a framework consisting of five perspectives. The perspectives are: (1) Strategic, (2) Organizational, (3) Capability, (4) Supplier......, and a (5) Customer Perspectives. The aim is to develop a holistic perspective of procurement by applying these five essential, but very different perspectives in order to achieve a holistic picture of the function. Design/methodology/approach The foundation is derived from various well-established theories...... within the five perspectives. Specifically, procurement was viewed from the perspective of organizational theory, network theory, resource/knowledge based views of the firm, transaction cost theory and various theories within the strategic field of research Findings By viewing procurement through...

  12. ASSESSMENT OF PROCUREMENT METHODS USED FOR ...

    African Journals Online (AJOL)

    Osondu

    2012-10-08

    Oct 8, 2012 ... client/or representatives so as to arrive at a tender figure and other ... client have a great influence on maintenance procurement. ... satisfaction and project success and the ... Construction Industries, and Hotels) top the list.

  13. Government Procurement Agreements and Telecommunications Business

    Directory of Open Access Journals (Sweden)

    Shin-Won Kang

    2001-12-01

    Full Text Available The opening of the telecommunications market is acceleration due to the world trends of deregulation and privatization under the WTO basic telecommunications agreements. Diversification of services and fast and efficient equipment procurement are becoming necessary conditions for the survival of telecommunications operators. However, the issue here is that telecommunications operators are still bound by the GPA (Government Procurement Agreement based on conditions of monopoly even though the procurement market in Korean is open substantially since 1997. Under such conditions, the continued application of the GPA on telecommunications operator who is highly competitive may result in a negative impact on the telecommunications business and quality of telecommunications service by undermining the autonomy of operator and decreasing operator’s procurement competitiveness. Therefore, this study examines the GPA and the issues raised by the agreement, and also attempts to suggest revisions or means of abrogating the unfair GPA with regards to the development and deregulation of the telecommunications business.

  14. The World Bank Group and Public Procurement--An Independent Evaluation : Volume 1. Building Procurement Capacity and Systems

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  15. Medicine prices, availability, and affordability in 36 developing and middle-income countries: a secondary analysis.

    Science.gov (United States)

    Cameron, A; Ewen, M; Ross-Degnan, D; Ball, D; Laing, R

    2009-01-17

    WHO and Health Action International (HAI) have developed a standardised method for surveying medicine prices, availability, affordability, and price components in low-income and middle-income countries. Here, we present a secondary analysis of medicine availability in 45 national and subnational surveys done using the WHO/HAI methodology. Data from 45 WHO/HAI surveys in 36 countries were adjusted for inflation or deflation and purchasing power parity. International reference prices from open international procurements for generic products were used as comparators. Results are presented for 15 medicines included in at least 80% of surveys and four individual medicines. Average public sector availability of generic medicines ranged from 29.4% to 54.4% across WHO regions. Median government procurement prices for 15 generic medicines were 1.11 times corresponding international reference prices, although purchasing efficiency ranged from 0.09 to 5.37 times international reference prices. Low procurement prices did not always translate into low patient prices. Private sector patients paid 9-25 times international reference prices for lowest-priced generic products and over 20 times international reference prices for originator products across WHO regions. Treatments for acute and chronic illness were largely unaffordable in many countries. In the private sector, wholesale mark-ups ranged from 2% to 380%, whereas retail mark-ups ranged from 10% to 552%. In countries where value added tax was applied to medicines, the amount charged varied from 4% to 15%. Overall, public and private sector prices for originator and generic medicines were substantially higher than would be expected if purchasing and distribution were efficient and mark-ups were reasonable. Policy options such as promoting generic medicines and alternative financing mechanisms are needed to increase availability, reduce prices, and improve affordability.

  16. Best Value Procurement - The Practical Approach

    OpenAIRE

    Storteboom, Arnoud

    2017-01-01

    Traditional procurement methods leave much room for improving risk management and value creation. However, Best Value Procurement (BVP) is designed to increase project value by mitigating risks and increasing the transparency by underscoring the pre-award phase. This shift in paradigm is reached by following a sequence of elements with the principles of transparency, performance information measuring and contractor clarification. The BVP philosophy is developed in the USA. Following is ...

  17. Empirical Analysis of Competition in Procurement Auctions

    OpenAIRE

    Tukiainen, Janne

    2008-01-01

    A vast amount of public services and goods are contracted through procurement auctions. Therefore it is very important to design these auctions in an optimal way. Typically, we are interested in two different objectives. The first objective is efficiency. Efficiency means that the contract is awarded to the bidder that values it the most, which in the procurement setting means the bidder that has the lowest cost of providing a service with a given quality. The second objective is to maximize ...

  18. Multidimensional procurement auctions with unknown weights

    DEFF Research Database (Denmark)

    Greve, Thomas

    This paper studies the consequences of holding a procurement auction when the principal chooses not to show its preferences. My paper extends the procurement auction model of Che (1993) to a situation where both the principal and the agents have private information. Thus, unknown parameters of bo...... gives rise to an analysis of a principal that can not fully commit to the outcome induced by the scoring rule. Therefore, my result apply to contract theory and it’s problems with imperfect commitment....

  19. International public procurement: From scant facts to hard data

    OpenAIRE

    Cernat, Lucian; Kutlina-Dimitrova, Zornitsa

    2015-01-01

    Public procurement is a negotiating area gaining in importance at multilateral and bilateral level, as evidenced by a brief review of procurement provisions in existing trade agreements. The size of procurement spending stands in most developed economies at double-digit percentage points of GDP. However, despite the size and importance of these markets, the factual information available to trade negotiators remains scarce. Although public procurement patterns (e.g. size of procurement markets...

  20. What Is the Status of Indonesian E-Procurement?

    OpenAIRE

    Achmad Nurmandi

    2013-01-01

    E-procurement is an important intrument to prevent corruption in goods and services procurement budget. Indonesia has been implementing the e-procurement project since 2008 based on Presidential Decree. President has stipulating annual order (presidential instruction) has to be obey by all ministries and local governments to procure their budget through r-procurement mechanism. However, untill 2012 fiscal year, this research found that only around 10.26% of central government institution proc...

  1. The Malaysian Public Procurement's Prevalent System and its Weaknesses

    OpenAIRE

    Rohana Othman; Husein Zakaria; Norlaili Nordin; Zamzam Shahidan; Kamaruzaman Jusoff

    2010-01-01

    Problem statement: This study examined the public procurement system as prevalent in the Malaysian government system of administration. Various aspects of public procurement are outlined including types and the processes that entail public procurement. This study also highlighted the weaknesses in the manual public procurement processes that are opened to potential abuse and mismanagement resulting in corruption. This study places the Malaysian Government public procurement system under the s...

  2. Procurement management in scientific research and production project

    International Nuclear Information System (INIS)

    Wan Yi

    2008-01-01

    To meet the requirement of development trend of scientific research and production, it is necessary to incorporate the modern procurement management theory in the whole procurement process for the items used in scientific research and production.This paper provided some suggestions to improve the procurement management by introducing the experiences in the application of the modern procurement management methods in the procurement of parts production. (author)

  3. Combined antiretroviral and anti- tuberculosis drug resistance ...

    African Journals Online (AJOL)

    these epidemics, many challenges remain.[3] Antiretroviral and anti-TB drug resistance pose considerable threats to the control of these epidemics.[4,5]. The breakdown in HIV/TB control within prisons is another emerging threat.[6,7] We describe one of the first reports of combined antiretroviral and anti-TB drug resistance ...

  4. Preliminary investigation of adherence to antiretroviral therapy ...

    African Journals Online (AJOL)

    Treatment of HIV with highly active antiretroviral therapy (HAART) has resulted in declining morbidity and mortality rates from HIV-associated diseases, but concerns regarding access and adherence are growing. To determine the adherence level and the reasons for non-adhering to antiretroviral therapy (ART) among ...

  5. NEW DRUGS NEW TARGETS AND NOVEL ANTIRETROVIRALS

    African Journals Online (AJOL)

    2005-11-02

    Nov 2, 2005 ... Highly active antiretroviral therapy (HAART) has to date been based on use of a triple combination of drugs chosen from three classes of antiretrovirals (ARVs), nucleoside reverse transcriptase inhibitors (NRTIs), non-nucleoside reverse transcriptase inhibitors (NNRTIs) and protease inhibitors (PIs).

  6. An evaluation of transit procurement training.

    Science.gov (United States)

    Noland, Robert B; Weiner, Marc D; Klein, Nicholas J; Puniello, Orin D

    2017-04-01

    We evaluated a training course called "Orientation to Transit Procurement", designed and conducted by the National Transit Institute. This course is designed to provide Federal Transit Administration (FTA) grantees an overview of regulations and best practices related to the procurement process. Our objective in conducting the evaluation was to understand how transit agency staff made changes in procurement practices in response to the course training. The evaluation was mixed mode: an Internet survey followed by in-depth interviews with a small group of respondents. Survey respondents were also provided with an open-ended question providing us with additional context for our evaluation. Results show that the training is substantially successful at meeting the goal of improving procurement practices at transit agencies; indeed, most respondents report making changes at their agencies as the proximate result of the training. This was at odds with our exploration of knowledge of procurement topics, as most respondents gave inaccurate answers on multiple-choice "knowledge questions". This may have been due to question structure or, more likely, the nature of online surveys. Suitable training on the procurement of information technology was also a main concern. The lack of training in this area is indicative of the broader challenge facing public transit agencies in how to incorporate new forms of technology into their existing practices and bureaucratic structures. Copyright © 2016 Elsevier Ltd. All rights reserved.

  7. Donor selection criteria and procurement

    International Nuclear Information System (INIS)

    Agcaoili, N.R.

    1999-01-01

    Donor selection is one of the most important aspects of tissue banking practice. Without a good donor selection criteria, the results of any effort of trying to preserve tissues will have disastrous outcome for the recipient of these tissues. While with a very good and strict donor selection the Tissue Bank can guarantee safe and effective tissue allografts. There are significant aspects in the history and physical examination of the donor that must be emphasized. A donor exclusion criteria has also been formulated together with a list of all the needed laboratory examinations to eliminate possible diseases that may be transferred from the donor. The methods of procurement of tissue allografts from living and cadaver donors will be described. The limitations and advantages of each will be taken.There are also special restrictions that are important in the practice of removing the tissues from the donors. All the necessary equipment should be ready and the potential risk on the personnel should be known to all doing Tissue Banking

  8. Strategies for price reduction of HIV medicines under a monopoly situation in Brazil

    Science.gov (United States)

    Chaves, Gabriela Costa; Hasenclever, Lia; Osorio-de-Castro, Claudia Garcia Serpa; Oliveira, Maria Auxiliadora

    2016-01-01

    ABSTRACT OBJECTIVE To analyze Government strategies for reducing prices of antiretroviral medicines for HIV in Brazil. METHODS Analysis of Ministry of Health purchases of antiretroviral medicines, from 2005 to 2013. Expenditures and costs of the treatment per year were analyzed and compared to international prices of atazanavir. Price reductions were estimated based on the terms of a voluntary license of patent rights and technology transfer in the Partnership for Productive Development Agreement for atazanavir. RESULTS Atazanavir, a patented medicine, represented a significant share of the expenditures on antiretrovirals purchased from the private sector. Prices in Brazil were higher than international references, and no evidence was found of a relationship between purchase volume and price paid by the Ministry of Health. Concerning the latest strategy to reduce prices, involving local production of the 200 mg capsule, the price reduction was greater than the estimated reduction. As for the 300 mg capsule, the amounts paid in the first two years after the Partnership for Productive Development Agreement were close to the estimated values. Prices in nominal values for both dosage forms remained virtually constant between 2011 (the signature of the Partnership for Productive Development Agreement), 2012 and 2013 (after the establishment of the Partnership). CONCLUSIONS Price reduction of medicines is complex in limited-competition environments. The use of a Partnership for Productive Development Agreement as a strategy to increase the capacity of local production and to reduce prices raises issues regarding its effectiveness in reducing prices and to overcome patent barriers. Investments in research and development that can stimulate technological accumulation should be considered by the Government to strengthen its bargaining power to negotiate medicines prices under a monopoly situation. PMID:26759969

  9. Strategies for price reduction of HIV medicines under a monopoly situation in Brazil

    Directory of Open Access Journals (Sweden)

    Gabriela Costa Chaves

    2015-01-01

    Full Text Available ABSTRACT OBJECTIVE To analyze Government strategies for reducing prices of antiretroviral medicines for HIV in Brazil. METHODS Analysis of Ministry of Health purchases of antiretroviral medicines, from 2005 to 2013. Expenditures and costs of the treatment per year were analyzed and compared to international prices of atazanavir. Price reductions were estimated based on the terms of a voluntary license of patent rights and technology transfer in the Partnership for Productive Development Agreement for atazanavir. RESULTS Atazanavir, a patented medicine, represented a significant share of the expenditures on antiretrovirals purchased from the private sector. Prices in Brazil were higher than international references, and no evidence was found of a relationship between purchase volume and price paid by the Ministry of Health. Concerning the latest strategy to reduce prices, involving local production of the 200 mg capsule, the price reduction was greater than the estimated reduction. As for the 300 mg capsule, the amounts paid in the first two years after the Partnership for Productive Development Agreement were close to the estimated values. Prices in nominal values for both dosage forms remained virtually constant between 2011 (the signature of the Partnership for Productive Development Agreement, 2012 and 2013 (after the establishment of the Partnership. CONCLUSIONS Price reduction of medicines is complex in limited-competition environments. The use of a Partnership for Productive Development Agreement as a strategy to increase the capacity of local production and to reduce prices raises issues regarding its effectiveness in reducing prices and to overcome patent barriers. Investments in research and development that can stimulate technological accumulation should be considered by the Government to strengthen its bargaining power to negotiate medicines prices under a monopoly situation.

  10. Cost-savings accruable to removing value added tax from antiretrovirals in the South African private health sector

    Directory of Open Access Journals (Sweden)

    Varsha Bangalee

    2017-10-01

    Full Text Available Background: Despite the important and essential role that medicines play in any society, all medicines, including those identified as essential, are uniformly subjected to 14% value added tax (VAT, regardless of their therapeutic value in the private healthcare sector of South Africa. The aim of this article is to demonstrate the potential cost-saving attained from the removal of VAT from the private sector pricing of essential medicines, using antiretroviral treatment as an example. Methods: An empirical analysis was undertaken to illustrate the potential cost-saving achieved by removing VAT from the Single Exit Price and the dispensing fee of essential medicines. This outcome was demonstrated by applying the methodology to an adult fixed dose combination 1st line antiretroviral regimen as well as to a group of 3rd line antiretroviral medicines. Results: The potential saving for the lowest priced generic and originator 1st line antiviral regimen accrued to ZAR 693.84 and ZAR 1085.04 over a year respectively. Regarding the 3rd line antiretroviral drugs, results yielded an annual saving of ZAR 1678.68 (darunavir, ZAR5741.04 (maraviroc and ZAR 159.48 (rilpivirine. Conclusions: Lobbying for the removal of VAT from the supply chain of medicines should be intensified. Policy development to monitor and recover lost government revenue through the removal of taxes should be explored.

  11. HIV drug resistance early warning indicators in cohorts of individuals starting antiretroviral therapy between 2004 and 2009: World Health Organization global report from 50 countries.

    Science.gov (United States)

    Bennett, Diane E; Jordan, Michael R; Bertagnolio, Silvia; Hong, Steven Y; Ravasi, Giovanni; McMahon, James H; Saadani, Ahmed; Kelley, Karen F

    2012-05-01

    The World Health Organization developed a set of human immunodeficiency virus drug resistance (HIVDR) early warning indicators (EWIs) to assess antiretroviral therapy clinic and program factors associated with HIVDR. EWIs are monitored by abstracting data routinely recorded in clinical records, and the results enable clinics and program managers to identify problems that should be addressed to minimize preventable emergence of HIVDR in clinic populations. As of June 2011, 50 countries monitored EWIs, covering 131 686 patients initiating antiretroviral treatment between 2004 and 2009 at 2107 clinics. HIVDR prevention is associated with patient care (appropriate prescribing and patient monitoring), patient behavior (adherence), and clinic/program management efforts to reduce treatment interruptions (follow up, retention on first-line ART, procurement and supply management of antiretroviral drugs). EWIs measure these factors and the results have been used to optimize patient and population treatment outcomes.

  12. The Compensative Effects of Tobacco Leaf Price Changes on Tax Revenue in China

    OpenAIRE

    Cai, Hailong; Kinnucan, Henry W.

    2009-01-01

    Tobacco production in China is influenced by a government-set procurement price for tobacco leaf, and an excise tax on tobacco leaf revenue. This study examines the increase in the procurement price needed to keep tax revenue constant in the face of a 50% reduction in the tax rate. This “compensative effect” is important because reductions in the tax rate are contemplated and tobacco tax revenue is a major source of funding for rural communities. Based on an equilibrium-displacement model of ...

  13. The logical underpinnings and benefits of pooled pharmaceutical procurement: a pragmatic role for our public institutions?

    Science.gov (United States)

    Huff-Rousselle, Maggie

    2012-11-01

    Multi-national pharmaceutical companies have long operated across national boundaries, and exercised significant leverage because of the breadth and depth of their market control. The goals of public health can be better served by redressing the imbalance in market leverage between supply and demand. Consolidation of purchasing power across borders, as well as within countries across organizational entities, is one means to addressing this imbalance. In those existing pooled procurement models that consolidate purchasing across national boundaries, benefits have included: 1) reductions in unit purchase prices; 2) improved quality assurance; 3) reduction or elimination of procurement corruption; 4) rationalized choice through better-informed selection and standardization; 5) reduction of operating costs and administrative burden; 6) increased equity between members; 7) augmented practical utility in the role of the host institutions (regional or international) administering the system; and finally, 8) increased access to essential medical products within each participating country. Many barriers to implementation of a multi-country pooled procurement system are eliminated when the mechanism is established within a regional or international institution, especially where participating countries are viewed (and view themselves) as clients/members of the institution, so that they have some sense of ownership over the procurement mechanism. This review article is based on two literature reviews, conducted between 2007 and 2009 (including publications from 1996 through 2009), and interviews with key informants. Copyright © 2012 Elsevier Ltd. All rights reserved.

  14. Predicting Global Fund grant disbursements for procurement of artemisinin-based combination therapies

    Directory of Open Access Journals (Sweden)

    O'Brien Megan E

    2008-10-01

    Full Text Available Abstract Background An accurate forecast of global demand is essential to stabilize the market for artemisinin-based combination therapy (ACT and to ensure access to high-quality, life-saving medications at the lowest sustainable prices by avoiding underproduction and excessive overproduction, each of which can have negative consequences for the availability of affordable drugs. A robust forecast requires an understanding of the resources available to support procurement of these relatively expensive antimalarials, in particular from the Global Fund, at present the single largest source of ACT funding. Methods Predictive regression models estimating the timing and rate of disbursements from the Global Fund to recipient countries for each malaria grant were derived using a repeated split-sample procedure intended to avoid over-fitting. Predictions were compared against actual disbursements in a group of validation grants, and forecasts of ACT procurement extrapolated from disbursement predictions were evaluated against actual procurement in two sub-Saharan countries. Results Quarterly forecasts were correlated highly with actual smoothed disbursement rates (r = 0.987, p Conclusion This analysis derived predictive regression models that successfully forecasted disbursement patterning for individual Global Fund malaria grants. These results indicate the utility of this approach for demand forecasting of ACT and, potentially, for other commodities procured using funding from the Global Fund. Further validation using data from other countries in different regions and environments will be necessary to confirm its generalizability.

  15. Trends in medicines procurement by the Brazilian federal government from 2006 to 2013.

    Science.gov (United States)

    Chama Borges Luz, Tatiana; Garcia Serpa Osorio-de-Castro, Claudia; Magarinos-Torres, Rachel; Wettermark, Bjorn

    2017-01-01

    The costs of medicines pose a growing burden on healthcare systems worldwide. A comprehensive understanding of current procurement processes provides strong support for the development of effective policies. This study examined Brazilian Federal Government pharmaceutical procurement data provided by the Integrated System for the Administration of General Services (SIASG) database, from 2006 to 2013. Medicine purchases were aggregated by volume and expenditure for each year. Data on expenditure were adjusted for inflation using the Extended National Consumer Price Index (IPCA) for December 31, 2013. Lorenz distribution curves were used to study the cumulative proportion of purchased therapeutic classes. Expenditure variance analysis was performed to determine the impact of each factor, price and/or volume, on total expenditure variation. Annual expenditure on medicines increased 2.72 times, while the purchased volume of drugs increased 1.99 times. A limited number of therapeutic classes dominated expenditure each year. Drugs for infectious diseases drove the increase in expenditures from 2006 to 2009 but were replaced by antineoplastic and immunomodulating agents beginning in 2010. Immunosuppressants (L04), accounted for one third of purchases since 2010, showing the most substantial growth in expenditures during the period (250-fold increase). The overwhelming price-related increase in expenditures caused by these medicines is bound to have a relevant impact on the sustainability of the pharmaceutical supply system. We observed increasing trends in expenditures, especially in specific therapeutic classes. We propose the development and implementation of better medicine procurement systems, and strategies to allow for monitoring of product price, effectiveness, and safety. This must be done with ongoing assessment of pharmaceutical innovations, therapeutic value and budget impact.

  16. Trends in medicines procurement by the Brazilian federal government from 2006 to 2013.

    Directory of Open Access Journals (Sweden)

    Tatiana Chama Borges Luz

    Full Text Available The costs of medicines pose a growing burden on healthcare systems worldwide. A comprehensive understanding of current procurement processes provides strong support for the development of effective policies. This study examined Brazilian Federal Government pharmaceutical procurement data provided by the Integrated System for the Administration of General Services (SIASG database, from 2006 to 2013. Medicine purchases were aggregated by volume and expenditure for each year. Data on expenditure were adjusted for inflation using the Extended National Consumer Price Index (IPCA for December 31, 2013. Lorenz distribution curves were used to study the cumulative proportion of purchased therapeutic classes. Expenditure variance analysis was performed to determine the impact of each factor, price and/or volume, on total expenditure variation. Annual expenditure on medicines increased 2.72 times, while the purchased volume of drugs increased 1.99 times. A limited number of therapeutic classes dominated expenditure each year. Drugs for infectious diseases drove the increase in expenditures from 2006 to 2009 but were replaced by antineoplastic and immunomodulating agents beginning in 2010. Immunosuppressants (L04, accounted for one third of purchases since 2010, showing the most substantial growth in expenditures during the period (250-fold increase. The overwhelming price-related increase in expenditures caused by these medicines is bound to have a relevant impact on the sustainability of the pharmaceutical supply system. We observed increasing trends in expenditures, especially in specific therapeutic classes. We propose the development and implementation of better medicine procurement systems, and strategies to allow for monitoring of product price, effectiveness, and safety. This must be done with ongoing assessment of pharmaceutical innovations, therapeutic value and budget impact.

  17. Cornea procurement, preservation and transplantation

    International Nuclear Information System (INIS)

    Hudson Silva

    1999-01-01

    Our experience on this subject is 40 years and we have seen the developments everywhere during this total period. Cornea procurement has been an unsurmountable problem in a large number of countries, mostly due to social and cultural reasons. The requirements for a simple eye bank to manage the supply for a local hospital are minimal. What is the most important is the donor base. In Sri Lanka nurtured in the traditions of Theravada Buddhism the donor base was easy to prepare. We had no difficulties with Christians and Hindus. For Muslims there are Fatwas in favour of donating eyes. But we always found them to be a reluctant group. But in predominantly Muslim countries, it is imperative that social workers should take up this issue, so those thousands may be helped. In all areas where attempts are made to procure comeas, it is important to have a day-and-night service available at short notice to collect any eyes offered. A trained technician with sterilised instruments to obtain eyes and blood sample must be available at a convenient location preferably in a large hospital. Even in places where the supply is infrequent, it is essential to have the readily-sterilised instruments to proceed to a donor site at short notice. To get eyes, general publicity in mass media alone is not sufficient. Such publicity makes people aware of the need for donor eyes and where a technician/doctor is available. What is more important is to canvass personally after a person has died For this purpose trained social workers may be employed, or the technician can do the motivation, as we do in Sri Lanka. Once eyes are removed, it is essential to pay careful attention to the appearance of the cadaver. It should not (and need not) cause any deformity as such event has a profound negative effect on the campaign. Many different preservation methods have been used over the years. Mc Carey-Kaufmann (MK) medium has been the standard for many years, and gives a life span of 4-5 days. The formula

  18. Launch of the "MICE Procurement" website for your future events

    CERN Multimedia

    The MICE Office team

    2014-01-01

    The number of MICE (Meeting, Incentive, Conference and Event) requests is on the increase and our hotel offer is constantly being developed.   The MICE Office has decided to create a dedicated website in order to offer the best possible service to its users. This site is accessible from the FP webpage (MICE Procurement) using your NICE login. It gives you access to the list of the establishments which have a contract with CERN, grouped by geographic area/star rating, and all related information. The establishments listed on this website can accommodate your local events, organised by CERN or in partnership with an institution. They were selected following a market survey and as a result of a price enquiry in accordance with CERN's Purchasing Rules. We offer a number of standard packages, but we will try to respond to any specific requirements. On the same site you can also access a longer list of hotels (also accessible via the GS website) for which prices and conditions have been nego...

  19. A robust internet-based auction to procure electricity forwards

    International Nuclear Information System (INIS)

    Woo, C.K.; Lloyd, D.; Borden, M.; Warrington, R.; Baskette, C.

    2004-01-01

    Securing forward contracts to manage procurement-cost risk is an intuitively appealing and economically reasonable strategy for a load-serving local distribution company (LDC) in today's volatile electricity marketplace. However, knowing what to buy does not guarantee least-cost implementation. The forward-contract price quoted by a prospective seller may not be the 'best deal' that an LDC could have obtained, especially when the forward contract desired by the LDC is not actively traded. This paper reports the results from five internet-based auctions for electricity forward contracts with non-firm delivery and varying hourly quantities held monthly by a Florida municipal utility (MU) from September 2002 to January 2003. The results confirm that a multi-round auction design is robust in realizing competitive price offers made by credit-worthy sellers, time-efficient contracting, and consistent cost savings to the MU. Thus, the Anglo-Dutch auction described herein is a reasonable substitute for generation ownership by an LDC. (author)

  20. Tuberculosis drug issues: prices, fixed-dose combination products and second-line drugs.

    Science.gov (United States)

    Laing, R O; McGoldrick, K M

    2000-12-01

    Access to tuberculosis drugs depends on multiple factors. Selection of a standard list of TB drugs to procure is the first step. This paper reviews the advantages and disadvantages of procuring and using fixed-dose combination (FDC) products for both the intensive and continuation phases of treatment. The major advantages are to prevent the emergence of resistance, to simplify logistic management and to reduce costs. The major disadvantage is the need for the manufacturers to assure the quality of these FDCs by bioavailability testing. The paper reports on the inclusion of second-line TB drugs in the 1999 WHO Essential Drug List (EDL). The need to ensure that these drugs are used within established DOTS-Plus programs is stressed. The price of TB drugs is determined by many factors, including producer prices, local taxes and duties as well as mark-ups and fees. TB drug prices for both the public and private sectors from industrialized and developing countries are reported. Price trends over time are also reported. The key findings of this study are that TB drug prices have generally declined in developing countries while they have increased in developed countries, both for the public and private sectors. Prices vary between countries, with the US paying as much as 95 times the price paid in a specific developing country. The prices of public sector first-line TB drugs vary little between countries, although differences do exist due to the procurement methods used. The price of tuberculin, a diagnostic agent, has increased dramatically in the US, with substantial inter-country variations in price. The paper suggests that further research is necessary to identify the reasons for the price disparities and changes over time, and suggests methods which can be used by National Tuberculosis Programme managers to ensure availability of quality assured TB drugs at low prices.

  1. Pricing and Trust

    DEFF Research Database (Denmark)

    Huck, Steffen; Ruchala, Gabriele K.; Tyran, Jean-Robert

    -competitive (monopolistic) markets. We then introduce a regulated intermediate price above the oligopoly price and below the monopoly price. The effect in monopolies is more or less in line with standard intuition. As price falls volume increases and so does quality, such that overall efficiency is raised by 50%. However......We experimentally examine the effects of flexible and fixed prices in markets for experience goods in which demand is driven by trust. With flexible prices, we observe low prices and high quality in competitive (oligopolistic) markets, and high prices coupled with low quality in non...

  2. Transformation of fraud activities in procurement system in Indonesia

    Science.gov (United States)

    Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.

    2017-03-01

    E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.

  3. Networking for knowledge capacity building of procurement professionals in Ghana

    Directory of Open Access Journals (Sweden)

    Kissi Ernest

    2016-12-01

    Full Text Available The role of public procurement professionals in achieving value for money in public procurement activities is widely acknowledged around the globe. This has inspired the organisation of training programmes and workshops for procurement professionals, particularly those in developing countries in order to hone their knowledge and skills for proper management of government projects. This paper sought to explore the opportunities in networking for knowledge capacity building of procurement professionals in Ghana. The study adopted quantitative research methods for both data collection and analysis. The paper revealed that professional networking can offer procurement professionals the opportunity to acquire new knowledge from external professionals, know global trends about procurement practice, and obtain new information from other institutions about procurement. It is recommended that a platform that can support a network of procurement professionals in Ghana should be developed in order to ensure effective interaction and communication among procurement professionals for their capacity building.

  4. 7 CFR 1000.50 - Class prices, component prices, and advanced pricing factors.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Class prices, component prices, and advanced pricing... advanced pricing factors. Class prices per hundredweight of milk containing 3.5 percent butterfat, component prices, and advanced pricing factors shall be as follows. The prices and pricing factors described...

  5. PUBLIC PROCUREMENT IN GHANA: THE IMPLEMENTATION CHALLENGES TO THE PUBLIC PROCUREMENT LAW 2003 (ACT 663

    Directory of Open Access Journals (Sweden)

    Ameyaw, Collins

    2012-08-01

    Full Text Available The purpose of this study was to identify various implementation bottlenecks to the Ghana Public Procurement Law 2003 (Act 663. The study adopted multiple research approaches, including; review of relevant literature, interviews and questionnaire survey of 49 District Assemblies and Metropolitan and Municipal Assemblies in the Ashanti and Brong Ahafo Regions of Ghana. The study identified low capacity of procurement professionals, low interaction between procurement entities and Public Procurement Authority (PPA, deliberate controlling of competition, non-compliance with provisions of the law, splitting of contracts into smaller lots, lack of funds and non-cooperativeness of suppliers, as the major challenges militating against the implementation of the Public Procurement Law.

  6. Competitive Pricing by a Price Leader

    OpenAIRE

    Abhik Roy; Dominique M. Hanssens; Jagmohan S. Raju

    1994-01-01

    We examine the problem of pricing in a market where one brand acts as a price leader. We develop a procedure to estimate a leader's price rule, which is optimal given a sales target objective, and allows for the inclusion of demand forecasts. We illustrate our estimation procedure by calibrating this optimal price rule for both the leader and the follower using data on past sales and prices from the mid-size sedan segment of the U.S. automobile market. Our results suggest that a leader-follow...

  7. ACCOUNTING ASPECTS OF PRICING AND TRANSFER PRICING

    Directory of Open Access Journals (Sweden)

    TÜNDE VERES

    2011-01-01

    Full Text Available The pricing methods in practice need really complex view of the business situation and depend on the strategy and market position of a company. The structure of a price seems simple: cost plus margin. Both categories are special area in the management accounting. Information about the product costs, the allocation methodologies in cost accounting, the analyzing of revenue and different level of the margin needs information from accounting system. This paper analyzes the pricing methods from management accounting aspects to show out the role of the accounting system in the short term and long term pricing and transfer pricing decisions.

  8. Price Reversal Pattern of ARV Drugs: A Transaction-Cost Approach Digression

    Directory of Open Access Journals (Sweden)

    Frank LORNE

    2015-05-01

    Full Text Available A price reversal pattern of ARV drugs was noted across lower and middle income countries in that the lower-income countries have higher prices relative to higher-income countries based on a 2008-2009 Summary Report by World Health Organization. The transaction costs affecting AVR drug pricing can be broadly classified into two kinds: One between the final users and the opinion/knowledge experts, and the other between the opinion/knowledge experts and the manufacturers. Economist’s version of price discrimination needs to be modified by including transaction costs. Transaction costs also point to institution creditability factors that will affect NGO procurement.

  9. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    Directory of Open Access Journals (Sweden)

    E A S Nelson

    Full Text Available BACKGROUND: The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA and Vaccine Procurement Baseline (VPB are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP that governments spend on their own vaccine procurement. OBJECTIVE: To determine realistic targets for VPA and VPB. METHODS: Organization for Economic Co-Operation and Development (OECD and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC countries disbursed (as % of GDP in current US$ for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. FINDINGS: In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013% and United Kingdom (0.0085% disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024% and Canada (0.008% made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. CONCLUSIONS: Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a vaccine procurement; and b immunization programs.

  10. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    Science.gov (United States)

    Nelson, E A S; Bloom, David E; Mahoney, Richard T

    2014-01-01

    The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. To determine realistic targets for VPA and VPB. Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs.

  11. Application of Derivatives Market for Controlling Risks of Commodity Prices

    Directory of Open Access Journals (Sweden)

    Rasuolė Drazdauskienė

    2015-05-01

    Full Text Available The issue of raw milk procurement cost level and fluctuation which inhibits strengthening negotiating positions of dairy product fabricants and probability of them staying competitive in the European Union, is examined. Scientific literature that analyzes risks of staple prices is overviewed in the article. The paper provides statistical data representing the situation of Lithuania in contrast with European Union rates. Global usage of prospective transactions and their possible influence on price regulation are analyzed. After examining statistical data and academic literature, conclusions are provided.

  12. Diagnostics of Procurement Activity of Industrial Enterprise

    OpenAIRE

    Veretennikova Anna B.

    2012-01-01

    The importance of procurement activity of industrial enterprise is substantiated in the article. The results of the critical analysis of the existing approaches to procurement effectiveness evaluating are presented. The main directions of diagnostics of procurement activity of industrial enterprise such as the quality of the organization and the resources, the effectiveness and efficiency, security of logistics operations.В статье обоснована актуальность диагностирования закупочной деятельнос...

  13. Heterogeneity and option pricing

    NARCIS (Netherlands)

    Benninga, Simon; Mayshar, Joram

    2000-01-01

    An economy with agents having constant yet heterogeneous degrees of relative risk aversion prices assets as though there were a single decreasing relative risk aversion pricing representative agent. The pricing kernel has fat tails and option prices do not conform to the Black-Scholes formula.

  14. Organ procurement after euthanasia: Belgian experience.

    Science.gov (United States)

    Ysebaert, D; Van Beeumen, G; De Greef, K; Squifflet, J P; Detry, O; De Roover, A; Delbouille, M-H; Van Donink, W; Roeyen, G; Chapelle, T; Bosmans, J-L; Van Raemdonck, D; Faymonville, M E; Laureys, S; Lamy, M; Cras, P

    2009-03-01

    Euthanasia was legalized in Belgium in 2002 for adults under strict conditions. The patient must be in a medically futile condition and of constant and unbearable physical or mental suffering that cannot be alleviated, resulting from a serious and incurable disorder caused by illness or accident. Between 2005 and 2007, 4 patients (3 in Antwerp and 1 in Liège) expressed their will for organ donation after their request for euthanasia was granted. Patients were aged 43 to 50 years and had a debilitating neurologic disease, either after severe cerebrovascular accident or primary progressive multiple sclerosis. Ethical boards requested complete written scenario with informed consent of donor and relatives, clear separation between euthanasia and organ procurement procedure, and all procedures to be performed by senior staff members and nursing staff on a voluntary basis. The euthanasia procedure was performed by three independent physicians in the operating room. After clinical diagnosis of cardiac death, organ procurement was performed by femoral vessel cannulation or quick laparotomy. In 2 patients, the liver, both kidneys, and pancreatic islets (one case) were procured and transplanted; in the other 2 patients, there was additional lung procurement and transplantation. Transplant centers were informed of the nature of the case and the elements of organ procurement. There was primary function of all organs. The involved physicians and transplant teams had the well-discussed opinion that this strong request for organ donation after euthanasia could not be waived. A clear separation between the euthanasia request, the euthanasia procedure, and the organ procurement procedure is necessary.

  15. Regulation of Pharmaceutical Prices

    DEFF Research Database (Denmark)

    Kaiser, Ulrich; Mendez, Susan J.; Rønde, Thomas

    On April 1, 2005, Denmark changed the way references prices, a main determinant of reimbursements for pharmaceutical purchases, are calculated. The previous reference prices, which were based on average EU prices, were substituted to minimum domestic prices. Novel to the literature, we estimate...... the joint eects of this reform on prices and quantities. Prices decreased more than 26 percent due to the reform, which reduced patient and government expenditures by 3.0 percent and 5.6 percent, respectively, and producer revenues by 5.0 percent. The prices of expensive products decreased more than...

  16. Gas price and oil price: a new level of competition; Gaspreis und Oelpreis. Eine neue Stufe des Wettbewerbs

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, Wolfgang; Poepperl, Claudia [Energie Consulting GmbH, Kehl (Germany)

    2012-01-15

    With a marked delay relative to electricity the gas market has now too come under the reign of competition. The dissociation of gas prices from oil prices was not only the result of successive deregulation but was also catalysed by the drop in demand attending the economic slump in 2008 and 2009. In response to the changing market environment the procurement processes of industrial and commercial customers have undergone lasting changes in the course of the past three years. At the same time, fierce competition has developed between the two energy carriers crude oil and natural gas.

  17. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2010-01-01

    strong requirements on the management style and company culture. Limitations of the research: The research is only based on two case studies, which obviously limits the possibility to generalize the results. Practical applications: The research presents two specific examples of innovative procurement......Aim: The aim of the paper is to present, analyse and identify learning from two case studies of innovative procurement in Facilities Management (FM) concerning the establishments of partnerships between clients and providers. Approach and methodology: A major study of FM best practice covering 36...

  18. Greening Non-Product-Related Procurement

    DEFF Research Database (Denmark)

    Mosgaard, Mette; Riisgaard, Henrik; Huulgaard, Rikke Dorothea

    2013-01-01

    link to the strategy for greening private consumption, as similarities exist and the purchasers lean on their private experiences when purchasing non-product related items; and finally, 3) Intensify the efforts in product categories in which strict normative legislation makes management more motivated....... environmental benefits of millions of procurement decisions do add up to large environmental improvement potentials. Thus, non-product-related procurement focuses on the similarities in the purchases made across different sectors. Explorative interviews with purchasers in Danish companies form the basis...

  19. Spare parts classification and procurement program

    International Nuclear Information System (INIS)

    Adlon, K.L.; Hassaballa, M.M.

    1986-01-01

    The cost benefits have been demonstrated for an integrated program, which is currently being implemented for two PWR stations with two 1100-MW units each. The component classification efforts reduced the number of safety-related components in several systems. Furthermore, the knowledge of the component specific function has contributed to the reduction of many safety-related parts per component, in addition to ensuring the procurement of parts to the correct safety level. The use of qualified commercial grade parts and components with their lower cost and reasonable procurement lead time compared to their 10 CFR 21 counterparts has a pronounced economic effect on the utility balance sheets

  20. Vascularized Composite Allografts: Procurement, Allocation, and Implementation.

    Science.gov (United States)

    Rahmel, Axel

    Vascularized composite allotransplantation is a continuously evolving area of modern transplant medicine. Recently, vascularized composite allografts (VCAs) have been formally classified as 'organs'. In this review, key aspects of VCA procurement are discussed, with a special focus on interaction with the procurement of classical solid organs. In addition, options for a matching and allocation system that ensures VCA donor organs are allocated to the best-suited recipients are looked at. Finally, the different steps needed to promote VCA transplantation in society in general and in the medical community in particular are highlighted.

  1. Sustainable Procurement in the United Nations

    DEFF Research Database (Denmark)

    Lund-Thomsen, Peter; Costa, Nives

    2011-01-01

    are highly contested among UN procurement officers and member states. However, so far the debate has mostly been based on assumptions about how the implementation of SP might affect developing country stakeholders. In fact, very few academic studies have been made of the economic, social and environmental......This paper deals with the integration of economic, social and environmental criteria into the purchasing practices of the United Nations (UN) system--also known as the UN engagement in sustainable procurement (SP). We argue that the debates about the pros and cons of the UN engaging in SP...

  2. Controlled procurement for nuclear power plants

    International Nuclear Information System (INIS)

    MacFarlane, I.S.

    1985-01-01

    A method is presented for establishing a controlled materials management system that facilitates materials procurement at nuclear power plants. This method is based on the determination of informational data requirements, appropriate input and approvals, and extent of administrative controls. Implementation of the techniques described herein will ensure that the accuracy of important procurement information is not compromised by unauthorized initial input or changes and/or failure to maintain the information. Needed material can thus be ordered through the materials management system with a high degree of confidence that the correct items are ordered, with minimal internal lead time and minimum delays during the receiving process

  3. ORIGINAL ARTICLES Antiretroviral treatment for children

    African Journals Online (AJOL)

    Kaplan-Meier survival estimate for 407 children at 1 year was. 84% (95% ... highly active antiretroviral therapy (HAART) to 3 million people living with HIV I AIDS in ... 5 Furthermore, improvements in growth and body composition parameters,.

  4. ORIGINAL ARTICLES Estimation of adult antiretroviral treatment ...

    African Journals Online (AJOL)

    workplace treatment programmes (WPTPs) and NGO ..... Our analysis also demonstrates significant inequality .... paying for their own treatment outside of DMPs,15 which may ... of antiretroviral coverage in men and women and to develop.

  5. One TV, One Price?

    OpenAIRE

    Jean Imbs; Haroon Mumtaz; Morten O. Ravn; Hélène Rey

    2009-01-01

    We use a unique dataset on television prices across European countries and regions to investigate the sources of differences in price levels. Our findings are as follows: (i) Quality is a crucial determinant of price differences. Even in an integrated economic zone as Europe, rich economies tend to consume higher quality goods. This effect accounts for the lion’s share of international price dispersion. (ii) Sizable international price differentials subsist even for the same television sets. ...

  6. Value-based pricing

    OpenAIRE

    Netseva-Porcheva Tatyana

    2010-01-01

    The main aim of the paper is to present the value-based pricing. Therefore, the comparison between two approaches of pricing is made - cost-based pricing and value-based pricing. The 'Price sensitively meter' is presented. The other topic of the paper is the perceived value - meaning of the perceived value, the components of perceived value, the determination of perceived value and the increasing of perceived value. In addition, the best company strategies in matrix 'value-cost' are outlined. .

  7. Flexible procurement systems is key to supply chain sustainability

    Directory of Open Access Journals (Sweden)

    Surajit Bag

    2016-04-01

    Full Text Available Background: In this dynamic business environment, manufacturers are focusing primarily on delivery performance and competitive pricing to win orders. It is essential that manufacturers adopt flexible procurement systems (FPSs in such an uncertain environment for business sustainability. Objectives: The purpose of the study is to identify the elements of FPSs and model the interrelationships between elements of FPSs and, finally, to understand how FPSs are linked with supply chain sustainability. Method: Besides providing a brief conceptual review of FPSs, the study largely illustrates the use of an innovative multi-criteria decision-making approach called total interpretive structural modelling (TISM. Results: The total interpretive structural modelling–based model evaluates the causality and illustrates elements with interpretation of relations and suggests that bottom-level elements are vital for sustainability in FPSs and avert risks. Secondly, strategic sourcing is positively influencing supplier integration. Thirdly, supplier integration positively influences supplier responsiveness. Fourthly, skills of flexible procurement workforce positively influence supplier integration. Fifthly, it is found that supplier integration positively influences flexible transportation. The sixth finding suggests that supplier integration positively influences eco-friendly packaging. The seventh finding highlights that supplier integration positively influences ISO 14001 certifications. The eighth finding explains that supplier responsiveness positively influences customer satisfaction. It is also observed that flexible transport reduces operational cost and environmental costs. The second last finding explains eco-friendly packaging and reduction in environmental cost by careful selection of packing material and chemicals. Lastly, it is found that ISO 14001/environmental certifications reduce environmental costs by greening suppliers and pressurises them

  8. Management of Contracts for F110 Engine Procurements

    National Research Council Canada - National Science Library

    Granetto, Paul

    2001-01-01

    This audit was performed in response to an allegation to the Defense Hotline that the Wright-Patterson Air Force Base Procurement Contracting Office made poor procurement decisions on F110 aircraft engine contracts...

  9. GPP Webinar: Solar Procurement Templates and Tools for Higher Education

    Science.gov (United States)

    Green Power Partnership webinar on solar procurement for Higher Education which features various tools and templates that schools can use to shape and manage the solar procurement process to a successful outcome.

  10. Design of reactive power procurement in deregulated electricity market

    African Journals Online (AJOL)

    user

    novel reactive power procurement model is proposed, which ensure secure and ..... The simulation is performed in the Matlab. .... focus of this paper is a reactive procurement market model, which is a basically two-step optimization process.

  11. 76 FR 37069 - Procurement List; Proposed Additions and Deletion

    Science.gov (United States)

    2011-06-24

    ... Certification The following products and service are proposed for addition to Procurement List for production by... following product is proposed for deletion from the Procurement List: Product Detergent, Laundry NSN: 7930...

  12. Minimising the expectation value of the procurement cost in electricity markets based on the prediction error of energy consumption

    OpenAIRE

    Yamaguchi, Naoya; Hori, Maiya; Ideguchi, Yoshinari

    2018-01-01

    In this paper, we formulate a method for minimising the expectation value of the procurement cost of electricity in two popular spot markets: {\\it day-ahead} and {\\it intra-day}, under the assumption that expectation value of unit prices and the distributions of prediction errors for the electricity demand traded in two markets are known. The expectation value of the total electricity cost is minimised over two parameters that change the amounts of electricity. Two parameters depend only on t...

  13. ACCOUNTING ASPECTS OF PRICING AND TRANSFER PRICING

    OpenAIRE

    TÜNDE VERES

    2011-01-01

    The pricing methods in practice need really complex view of the business situation and depend on the strategy and market position of a company. The structure of a price seems simple: cost plus margin. Both categories are special area in the management accounting. Information about the product costs, the allocation methodologies in cost accounting, the analyzing of revenue and different level of the margin needs information from accounting system. This paper analyzes the pricing methods from m...

  14. Regional trade agreements & procurement rules : facilitators or hindrances?

    OpenAIRE

    ANDERSON, Robert D.; MÜLLER, Anna Caroline; PELLETIER, Philippe

    2015-01-01

    This Working Paper considers the significance of government procurement chapters in regional trade agreements (RTAs), both in their own right and vis-à-vis the WTO Agreement on Government Procurement (GPA). The paper finds, inter alia, that: (i) a strong complementarity exists between government procurement trade commitments and general goods and services trade commitments, making integration of procurement commitments in a more general system such as the WTO Agreements desirable; (ii) govern...

  15. Innovation public procurement in Russia: problems of institutional arrangements

    Directory of Open Access Journals (Sweden)

    Korytcev Maxim, A.

    2015-12-01

    Full Text Available The paper explores the problems of public procurement in innovation sphere in Russia, its institutional organization. In international practice, some strategies of innovation stimulation (by public procurement are developing. There is necessity to use more elements of these strategies in Russian National Procurement System. The active National Public Procurement System has no enough effective methods and instruments for stimulating innovation development now.

  16. Effects of Procurement Related Factors on Construction Project ...

    African Journals Online (AJOL)

    Several Literatures in construction management support the view that procurements have impacts on project performance. Aim of this study is to investigate the effects of procurement related factors of procurement selection criteria, tendering methods and variation orders on project performance. Purpose of the study is to ...

  17. 7 CFR 235.9 - Procurement and property management standards.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management standards. 235.9... Procurement and property management standards. (a) Requirements. State agencies shall comply with the requirements of 7 CFR part 3016 concerning the procurement of supplies, equipment and other services with State...

  18. 41 CFR 101-26.507-2 - Procurement time schedule.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedule. 101-26.507-2 Section 101-26.507-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...

  19. 7 CFR 248.21 - Procurement and property management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management. 248.21 Section... Provisions § 248.21 Procurement and property management. (a) Requirements. State agencies shall comply with the requirements of 7 CFR part 3016 for procurement of supplies, equipment and other services with...

  20. 41 CFR 101-26.501-5 - Procurement time schedules.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedules. 101-26.501-5 Section 101-26.501-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...

  1. 76 FR 78248 - Procurement List; Addition and Deletions

    Science.gov (United States)

    2011-12-16

    .... Service Type/Location: Laundry Service, Stratton Medical Center, 113 Holland Ave, Albany, NY. [[Page 78249...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...

  2. Greening Operations Management: An Online Sustainable Procurement Course for Practitioners

    Science.gov (United States)

    Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian

    2009-01-01

    In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…

  3. Nepal : Electronic Government Procurement Readiness Assessment and Roadmap

    OpenAIRE

    World Bank

    2007-01-01

    The assessment focused on the degree of readiness of Government of Nepal's (GoN's) current public procurement environment for making a transition from a traditional paper-based, manual procurement transaction processing and communication to electronic government procurement (e-GP). Some 20 public and private sector organizations, involved in a wide range of functions that relate to public...

  4. Maldives : Electronic Government Procurement Readiness Assessment and Roadmap

    OpenAIRE

    World Bank

    2007-01-01

    The assessment focuses on the degree of readiness of Government of The Maldives's (GoTM's) current public procurement environment for making a transition from traditional paper-based, manual methods of procurement transaction processing and communication to electronic government procurement (e-GP). The e-GP Assessment was discussed individually with informed respondents in the public and p...

  5. Study on Comparative Efficiencies in Vaccine Procurement Mechanisms

    OpenAIRE

    Bumpas, Janet

    2008-01-01

    Vaccinations are amongst the most cost-effective public health interventions. Vaccine procurement is a complex issue that interweaves the domains of public health, commodity security, ethics, and procurement. Its cross-disciplinary nature means that neither a straightforward analysis stemming from just one discipline nor a cookie-cutter application of World Bank procurement principles of e...

  6. 32 CFR 22.205 - Distinguishing assistance from procurement.

    Science.gov (United States)

    2010-07-01

    ... procurement contract, is the appropriate instrument, based on the following: (a) Purpose. (1) The grants... purpose is acquisition, then the grants officer shall judge that a procurement contract is the appropriate... 32 National Defense 1 2010-07-01 2010-07-01 false Distinguishing assistance from procurement. 22...

  7. Procurement maturity, alignment and performance: a Dutch hospital case comparison.

    NARCIS (Netherlands)

    Plomp, M.; Batenburg, R.

    2009-01-01

    Procurement is an important supporting business function, with which competitive advantage can potentially be achieved. In this paper, the relation between maturity and alignment in procurement on the one hand, and procurement performance on the other, is investigated in the case study setting of

  8. Procurement Maturity, Alignment and Performance: a Dutch Hospital Case Comparison

    NARCIS (Netherlands)

    Plomp, M.G.A.; Batenburg, R.S.

    2009-01-01

    Procurement is an important supporting business function, with which competitive advantage can potentially be achieved. In this paper, the relation between maturity and alignment in procurement on the one hand, and procurement performance on the other, is investigated in the case study setting of

  9. 41 CFR 101-26.602-4 - Procurement of coal.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  10. Exporter Price Premia?

    DEFF Research Database (Denmark)

    Jäkel, Ina Charlotte; Sørensen, Allan

    This paper provides new evidence on manufacturing firms' output prices: in Denmark, on average, exported varieties are sold at a lower price (i.e. a negative exporter price premium) relative to only domestically sold varieties. This finding stands in sharp contrast to previous studies, which have...... found positive exporter price premia. We also document that the exporter price premium varies substantially across products (both in terms of sign and magnitude). We show that in a standard heterogeneous firms model with heterogeneity in quality as well as production efficiency there is indeed no clear......-cut prediction on the sign of the exporter price premium. However, the model unambiguously predicts a negative exporter price premium in terms of quality-adjusted prices, i.e. prices per unit of quality. This prediction is broadly borne out in the Danish data: while the magnitude of the premium varies across...

  11. The global pediatric antiretroviral market: analyses of product availability and utilization reveal challenges for development of pediatric formulations and HIV/AIDS treatment in children

    Directory of Open Access Journals (Sweden)

    Jambert Elodie

    2010-10-01

    Full Text Available Abstract Background Important advances in the development and production of quality-certified pediatric antiretroviral (ARV formulations have recently been made despite significant market disincentives for manufacturers. This progress resulted from lobbying and innovative interventions from HIV/AIDS activists, civil society organizations, and international organizations. Research on uptake and dispersion of these improved products across countries and international organizations has not been conducted but is needed to inform next steps towards improving child health. Methods We used information from the World Health Organization Prequalification Programme and the United States Food and Drug Administration to describe trends in quality-certification of pediatric formulations and used 7,989 donor-funded, pediatric ARV purchase transactions from 2002-2009 to measure uptake and dispersion of new pediatric ARV formulations across countries and programs. Prices for new pediatric ARV formulations were compared to alternative dosage forms. Results Fewer ARV options exist for HIV/AIDS treatment in children than adults. Before 2005, most pediatric ARVs were produced by innovator companies in single-component solid and liquid forms. Five 2-in1 and four 3-in-1 generic pediatric fixed-dose combinations (FDCs in solid and dispersible forms have been quality-certified since 2005. Most (67% of these were produced by one quality-certified manufacturer. Uptake of new pediatric FDCs outside of UNITAID is low. UNITAID accounted for 97-100% of 2008-2009 market volume. In total, 33 and 34 countries reported solid or dispersible FDC purchases in 2008 and 2009, respectively, but most purchases were made through UNITAID. Only three Global Fund country recipients reported purchase of these FDCs in 2008. Prices for pediatric FDCs were considerably lower than liquids but typically higher than half of an adult FDC. Conclusion Pediatric ARV markets are more fragile than

  12. The global pediatric antiretroviral market: analyses of product availability and utilization reveal challenges for development of pediatric formulations and HIV/AIDS treatment in children.

    Science.gov (United States)

    Waning, Brenda; Diedrichsen, Ellen; Jambert, Elodie; Bärnighausen, Till; Li, Yun; Pouw, Mieke; Moon, Suerie

    2010-10-17

    Important advances in the development and production of quality-certified pediatric antiretroviral (ARV) formulations have recently been made despite significant market disincentives for manufacturers. This progress resulted from lobbying and innovative interventions from HIV/AIDS activists, civil society organizations, and international organizations. Research on uptake and dispersion of these improved products across countries and international organizations has not been conducted but is needed to inform next steps towards improving child health. We used information from the World Health Organization Prequalification Programme and the United States Food and Drug Administration to describe trends in quality-certification of pediatric formulations and used 7,989 donor-funded, pediatric ARV purchase transactions from 2002-2009 to measure uptake and dispersion of new pediatric ARV formulations across countries and programs. Prices for new pediatric ARV formulations were compared to alternative dosage forms. Fewer ARV options exist for HIV/AIDS treatment in children than adults. Before 2005, most pediatric ARVs were produced by innovator companies in single-component solid and liquid forms. Five 2-in1 and four 3-in-1 generic pediatric fixed-dose combinations (FDCs) in solid and dispersible forms have been quality-certified since 2005. Most (67%) of these were produced by one quality-certified manufacturer. Uptake of new pediatric FDCs outside of UNITAID is low. UNITAID accounted for 97-100% of 2008-2009 market volume. In total, 33 and 34 countries reported solid or dispersible FDC purchases in 2008 and 2009, respectively, but most purchases were made through UNITAID. Only three Global Fund country recipients reported purchase of these FDCs in 2008. Prices for pediatric FDCs were considerably lower than liquids but typically higher than half of an adult FDC. Pediatric ARV markets are more fragile than adult markets. Ensuring a long-term supply of quality, well

  13. Price strategy and pricing strategy: terms and content identification

    OpenAIRE

    Panasenko Tetyana

    2015-01-01

    The article is devoted to the terminology and content identification of seemingly identical concepts "price strategy" and "pricing strategy". The article contains evidence that the price strategy determines the direction, principles and procedure of implementing the company price policy and pricing strategy creates a set of rules and practical methods of price formation in accordance with the pricing strategy of the company.

  14. 45 CFR 2541.360 - Procurement.

    Science.gov (United States)

    2010-10-01

    ... foster greater economy and efficiency, grantees and subgrantees are encouraged to enter into State and... procured, and when necessary, shall set forth those minimum essential characteristics and standards to... grantee or subgrantee desires to have the review accomplished after a solicitation has been developed, the...

  15. 20 CFR 437.36 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... greater economy and efficiency, grantees and subgrantees are encouraged to enter into State and local... procured, and when necessary, must set forth those minimum essential characteristics and standards to which... desires to have the review accomplished after a solicitation has been developed, SSA may still review the...

  16. Online Reverse Auctions for Procurement of Services

    NARCIS (Netherlands)

    U.L. Radkevitch (Uladzimir)

    2008-01-01

    textabstractOnline reverse auctions, in which a buyer seeks to select a supplier and suppliers compete for contracts by bidding online, revolutionized corporate procurement early this century. Shortly after they had been pioneered by General Electric, many companies rushed to adopt reverse auctions

  17. 21 CFR 1403.36 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... be a selection criteria provided its application leaves an appropriate number of qualified firms... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Procurement. 1403.36 Section 1403.36 Food and.... No employee, officer or agent of the grantee or subgrantee shall participate in selection, or in the...

  18. Procurement of medical equipment in Sweden

    Directory of Open Access Journals (Sweden)

    Heikki Terio

    2010-02-01

    Full Text Available In many hospitals in Sweden the importance of technology management is already accepted and accepted since the hospital managements have recognised that technology is an integral part of all major policy and planning decisions. Today’s medical devices are technically complex and sometimes a system of interacting devices is required to achieve the desired clinical function. If the hospitals want to use the latest, modern technology, then they need to make substantial investments in both equipment and competence. Complex technology, large investments and need of highly qualii ed personnel to handle the medical devices are factors that indicate a need of well-dei ned procurement process as an essential part of the total health technology management system that should be used in a hospital. In such a procurement process, carefully prepared planning of technology investments can reduce the running costs and costs for maintenance substantially. In addition, a well-dei ned procurement process contributes to increase the patient safety. In Karolinska University Hospital goods and services are purchased for more than 20% of the hospital’s €1.2 billion turnover. It is therefore very important that the procurement is carried out ef ectively.

  19. 78 FR 59658 - Procurement List; Additions

    Science.gov (United States)

    2013-09-27

    ... Accordingly, the following products and services are added to the Procurement List: Products Laundry Net... ADMINISTRATION, BOULDER, CO. Service Type/Location: Laundry Service, US Coast Guard Base, Portsmouth, VA. NPA... GUARD, BASE PORTSMOUTH, PORTSMOUTH, VA Service Type/Location: Laundry Service, Federal Bureau of Prisons...

  20. Pre-commercial procurement : regulatory effectiveness?

    NARCIS (Netherlands)

    Apostol, Anca Ramona

    2014-01-01

    Is public procurement of research and development (‘R&D’) services the key to European Union (‘EU’)’s sustainable welfare? Is it being regulated in accordance with economic prescripts for effectiveness? Is the regulatory and policy setting clear and comprehensive in order to stimulate a widespread

  1. 78 FR 34351 - Procurement List; Additions

    Science.gov (United States)

    2013-06-07

    .... ADDRESSES: Committee for Purchase from People Who are Blind or Severely Disabled, 1401 S. Clark Street... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions AGENCY: Committee for Purchase from People Who are Blind or Severely Disabled. ACTION: Additions to the...

  2. 78 FR 53734 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-08-30

    ...: Committee for Purchase From People Who Are Blind or Severely Disabled, 1401 S Clark Street, Suite 10800... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  3. 78 FR 77105 - Procurement List; Proposed Addition

    Science.gov (United States)

    2013-12-20

    ... People Who Are Blind or Severely Disabled, 1401 S. Clark Street, Suite 10800, Arlington, Virginia, 22202... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Addition AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  4. 78 FR 50040 - Procurement List, Proposed Additions

    Science.gov (United States)

    2013-08-16

    ... People Who Are Blind or Severely Disabled, 1401 S Clark Street, Suite 10800, Arlington, Virginia, 22202... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List, Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  5. 78 FR 19248 - Procurement List; Proposed Addition

    Science.gov (United States)

    2013-03-29

    ... Purchase From People Who Are Blind or Severely Disabled, 1401 S. Clark Street, Suite 10800, Arlington... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Addition AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  6. Organ procurement from executed prisoners in China.

    Science.gov (United States)

    Sharif, A; Singh, M Fiatarone; Trey, T; Lavee, J

    2014-10-01

    Organ procurement from executed prisoners in China is internationally condemned, yet this practice continues unabated in 2014. This is despite repeated announcements from Chinese authorities that constructive measures have been undertaken to conform to accepted ethical standards. While there is unanimous agreement on the unethical nature of using organs from executed prisoners, due to its limitations on voluntary and informed consent, there is insufficient coverage of forced organ procurement from prisoners of conscience without consent. Strategies to influence positive change in China over the last few decades have failed to bring this practice to an end. While organ donation and transplantation services in China have undergone considerable structural changes in the last few years, fundamental attempts to shift practice to ethically sourced organs have floundered. In this article, we discuss the organ trade in China, reflect upon organ procurement from executed prisoners (including both capital prisoners and prisoners of conscience) and provide an overview of contradictory Chinese efforts to halt forced organ procurement from executed prisoners. Finally, we highlight current actions being taken to address this issue and offer comprehensive recommendations to bring this ethically indefensible practice to an immediate end. © Copyright 2014 The American Society of Transplantation and the American Society of Transplant Surgeons.

  7. Issues in organ procurement, allocation, and transplantation.

    Science.gov (United States)

    Nierste, Deborah

    2013-01-01

    Organ transplantation extends lives and improves health but presents complex ethical dilemmas for nurses caring for donors, recipients, and their families. This article overviews organ procurement and allocation, discusses ethical dilemmas in transplantation, and offers strategies from professional and biblical perspectives for coping with moral distress and maintaining compassionate care.

  8. 77 FR 70738 - Procurement List Additions

    Science.gov (United States)

    2012-11-27

    ... Fire Fighters, Metal NSN: CBFF0053--Nameplate, Navy Fire Fighters, 2 Line, Metal NSN: CBFF0054--Collar, Brass, Navy Fire Fighters, Metal NSN: CBFF0055--Shorts, Navy Fire Fighters, Physical Training, Small... following products are added to the Procurement List: PRODUCTS: NSN: CBFF0001--Shirt, Navy Fire Fighters...

  9. SMEs cooperate to meet social procurement conditions

    NARCIS (Netherlands)

    Oden, Petra

    2015-01-01

    A growing amount of (semi) public organizations in the Netherlands write tenders with mandatory social conditions. It is important for SMEs to focus on social procurement in their business strategy. SMEs should be proactive and try to affect the conditions (semi) public organizations write in their

  10. 76 FR 57719 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-09-16

    ... proposed for addition to the Procurement List for production by the nonprofit agencies listed: Products NSN: 7930-00-NIB-0583--Refills, Bathroom Cleaner and Deodorizer, Cartridge Concentrate. NSN: 7930-00-NIB-0584--Starter Kit, Bathroom Cleaner and Deodorizer, Cartridge Concentrate. NSN: 7930-00-NIB-0585...

  11. 78 FR 12296 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-02-22

    ... services are proposed for addition to the Procurement List for production by the nonprofit agencies listed... and Trailer Wash, 55 GL NSN: 7930-00-NIB-0649--Cleaner/Degreaser, Heavy Duty, Biodegradable, Car and Trucks, 5 GL NSN: 7930-00-NIB-0650--Cleaner/Degreaser, Heavy Duty, Biodegradable, Car and Trucks, 55 GL...

  12. Procurement Officer | IDRC - International Development Research ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... efficient, and ethical and provide the best possible value to the IDRC; supporting the ... procurement processes are perceived by suppliers as fair, open and ethical; ... while ensuring to protect confidential information;; analyses, negotiates and ... and knowledge, and interpret, assess and communicate current IDRC policy, ...

  13. 78 FR 73504 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-12-06

    ... Logistics Support Detachment, Undisclosed Location*, Ft. Belvoir, VA. NPA: MVLE, Inc., Springfield, VA. Contracting Activity: Directorate of Contracting Procurement Logistics Support Detachment, Fort Belvoir, VA.... Lineback, Director, Business Operations. [FR Doc. 2013-29139 Filed 12-5-13; 8:45 am] BILLING CODE 6353-01-P ...

  14. 77 FR 60969 - Procurement List; Additions

    Science.gov (United States)

    2012-10-05

    ... Are Blind or Severely Disabled published a notice for additions to the Procurement List with the... Committee for Purchase From People Who Are Blind or Severely Disabled published notices of proposed..., Phoenix, AZ. Service Type/Location: Custodial and Grounds Maintenance Services, Austin Courthouse, 501...

  15. Pricing structures in US coal supply contracts

    Science.gov (United States)

    Kacker, Kanishka

    The subject of my dissertation is the study of coal procurement by electric utilities in the US over 2 decades, from 1979 to 2000. Energy markets are typically characterized by severe contracting problems. Buyers and sellers therefore employ various instruments, such as contract length or complex pricing arrangements, to restrict these problems. Relationship specific investment, wherein buyers make investments specific to their suppliers, has been advanced as a prominent explanation for contractual length. Investment decisions are however endogenous in length or pricing, making causal identification of the role of investment specificity difficult. In my first chapter, I attempt a resolution. I use the 1990 Clean Air Act Amendment as an exogenous shifter of the extent of relationship specific investment. A key feature of the Amendment's design helps me define a difference-in-difference model arguably free of the endogeneity issues discussed above. I find that the plants forced into switching - Phase I plants located in the US Midwest - are more likely to choose fixed price contracts than those that were not. Further they also write contracts of shorter terms, with the reduction being approximately 30%. Considerably little is known about the performance implications of contractual choices. These form the basis for Chapter 2. Here I find prices to be lower, by between 5% to 20% of the total transaction price, but the probability of renegotiation higher, under fixed price contracts than under escalator or cost-plus contracts. Contract choices appear consistent with a trade-off between establishing incentives ex-ante and lowering negotiation costs ex-post, with relationship specific investments in particular making such a trade-off compelling. Chapter 3 considers the regulatory environment these utilities were subject to. Both incentive based regulation as well as the restructuring of electricity generation are smaller in comparison to relationship specific investment

  16. Valuation Struggles over Pricing

    DEFF Research Database (Denmark)

    Pallesen, Trine

    2016-01-01

    of creating political markets, and political prices, here understood as market distortion. This paper studies the ‘politics’ of pricing by following the adoption of the first feed-in tariff in France. Pricing as a way of achieving non-economic ends, such as climate mitigation, brings the values of several...... public goods into play, all the while prompting a translation of these values into a single price. Following the struggles over the pricing of wind power in the early 2000s, the study illustrates that rather than a pollution of the market sphere by that of politics, a politics of pricing can be observed...

  17. Forward Commitment Procurement : A practical methodology that helps to manage risk in procuring innovative goods and services

    NARCIS (Netherlands)

    Whyles, G.; Meerveld, H. van; Nauta, N.J.

    2015-01-01

    The Forward Commitment Procurement (FCP) is a Public Procurement of Innovation (PPI) methodology. It was specifically designed to both provide a practical methodology for procurers to follow and to manage the perceived risk of the customer and supplier in innovation investments. The paper describes

  18. Improving adherence to antiretroviral therapy

    Directory of Open Access Journals (Sweden)

    Nischal K

    2005-01-01

    Full Text Available Antiretroviral therapy (ART has transformed HIV infection into a treatable, chronic condition. However, the need to continue treatment for decades rather than years, calls for a long-term perspective of ART. Adherence to the regimen is essential for successful treatment and sustained viral control. Studies have indicated that at least 95% adherence to ART regimens is optimal. It has been demonstrated that a 10% higher level of adherence results in a 21% reduction in disease progression. The various factors affecting success of ART are social aspects like motivation to begin therapy, ability to adhere to therapy, lifestyle pattern, financial support, family support, pros and cons of starting therapy and pharmacological aspects like tolerability of the regimen, availability of the drugs. Also, the regimen′s pill burden, dosing frequency, food requirements, convenience, toxicity and drug interaction profile compared with other regimens are to be considered before starting ART. The lack of trust between clinician and patient, active drug and alcohol use, active mental illness (e.g. depression, lack of patient education and inability of patients to identify their medications, lack of reliable access to primary medical care or medication are considered to be predictors of inadequate adherence. Interventions at various levels, viz. patient level, medication level, healthcare level and community level, boost adherence and overall outcome of ART.

  19. The problems of accountable and analytical procuring of enterprise management

    Directory of Open Access Journals (Sweden)

    Kovalova Tatiana Volodymyrivna

    2016-02-01

    Full Text Available This article investigated main aspects of accountable and analytical procuring of enterprise management. It was found essence of accountable and analytical procuring of enterprise management, purpose, functions and tasks. It was determined main elements and essence of accountable and analytical information taking into consideration needs of modern management. In the article are exposed structural elements of accountable and analytical procuring. It was formed conceptual approaches of building accountable and analytical procuring of enterprise management. It was analyzed main problems of improving accountable and analytical informational procuring of taking managerial decisions with the aim of solving economic problems due to current situation of national economy.

  20. Potential fraudulent behaviors in e-procurement implementation in Indonesia

    Science.gov (United States)

    Huda, S. N.; Setiani, N.; Pulungan, R.; Winarko, E.

    2017-03-01

    Corruptions in public procurement have occurred in various parts of the world, especially in developing countries. Implementation of SPSE (electronic procurement system) as the e-procurement system in Indonesia is based on the government’s intentions towards clean and good governance by fighting corruption, collusion, and nepotism. Procurement in Indonesia is carried out through SPSE, which is developed by LKPP (Government Policy on Procurement of Goods/Services). Although this system has brought many positive effects, there are still found many practices of fraud occurring in the implementation of the system. In this paper, we try to identify these practices and then to systematically categorize and analyze them.

  1. Optimal combined purchasing strategies for a risk-averse manufacturer under price uncertainty

    Directory of Open Access Journals (Sweden)

    Qiao Wu

    2015-09-01

    Full Text Available Purpose: The purpose of our paper is to analyze optimal purchasing strategies when a manufacturer can buy raw materials from a long-term contract supplier and a spot market under spot price uncertainty. Design/methodology/approach: This procurement model can be solved by using dynamic programming. First, we maximize the DM’s utility of the second period, obtaining the optimal contract quantity and spot quantity for the second period. Then, maximize the DM’s utility of both periods, obtaining the optimal purchasing strategy for the first period. We use a numerical method to compare the performance level of a pure spot sourcing strategy with that of a mixed strategy. Findings: Our results show that optimal purchasing strategies vary with the trend of contract prices. If the contract price falls, the total quantity purchased in period 1 will decrease in the degree of risk aversion. If the contract price increases, the total quantity purchased in period 1 will increase in the degree of risk aversion. The relationship between the optimal contract quantity and the degree of risk aversion depends on whether the expected spot price or the contract price is larger in period 2. Finally, we compare the performance levels between a combined strategy and a spot sourcing strategy. It shows that a combined strategy is optimal for a risk-averse buyer. Originality/value: It’s challenging to deal with a two-period procurement problem with risk consideration. We have obtained results of a two-period procurement problem with two sourcing options, namely contract procurement and spot purchases. Our model incorporates the buyer’s risk aversion factor and the change of contract prices, which are not addressed in early studies.

  2. Public perspectives on biospecimen procurement: what biorepositories should consider.

    Science.gov (United States)

    L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M

    2013-06-01

    Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.

  3. EIA and green procurement: Opportunities for strengthening their coordination

    International Nuclear Information System (INIS)

    Uttam, Kedar; Faith-Ell, Charlotta; Balfors, Berit

    2012-01-01

    EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: ► This paper identifies opportunities to link EIA and green procurement. ► Pre-decision phase of EIA could be appropriate for planning green procurement. ► Future research should investigate the mechanism for establishing the link.

  4. EIA and green procurement: Opportunities for strengthening their coordination

    Energy Technology Data Exchange (ETDEWEB)

    Uttam, Kedar, E-mail: kedar@kth.se [Department of Land and Water Resources Engineering, Royal Institute of Technology, Stockholm (Sweden); Faith-Ell, Charlotta, E-mail: charlotta.faith-ell@WSPGroup.se [WSP Sweden (Sweden); Balfors, Berit, E-mail: balfors@kth.se [Department of Land and Water Resources Engineering, Royal Institute of Technology, Stockholm (Sweden)

    2012-02-15

    EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: Black-Right-Pointing-Pointer This paper identifies opportunities to link EIA and green procurement. Black-Right-Pointing-Pointer Pre-decision phase of EIA could be appropriate for planning green procurement. Black-Right-Pointing-Pointer Future research should investigate the mechanism for establishing the link.

  5. PRICES IN COMPETITIVE SYSTEM

    Directory of Open Access Journals (Sweden)

    VADUVA MARIA

    2017-08-01

    Full Text Available Regularities of competitive market determine rules for determining prices and their dynamics. Orientation prices to competition (competitive pricing is the strategy most frequently used in countries with market economies and especially for exports. Moreover, in an economy dominated by market competition it cannot be ignored without certain risks the prices resulting from competition between products bidders. Companies that use this type of strategy seek to maintain a level of prices linked to that charged by other competitors (or exporting producers generally no longer covering production costs or demand, relying on the assumption that the average market price is a reasonable basis of costs. But the way how practical guidance and reporting to the competition in every price strategy, will be determined by the company's market position, by the available power and enjoyed prestige, objectives and prospects of its market share etc. according to these elements, there may be several versions of pricing strategies oriented to competitors.

  6. Retail Price Model

    Science.gov (United States)

    The Retail Price Model is a tool to estimate the average retail electricity prices - under both competitive and regulated market structures - using power sector projections and assumptions from the Energy Information Administration.

  7. Natural gas pricing

    International Nuclear Information System (INIS)

    Freedenthal, C.

    1993-01-01

    Natural gas pricing is the heart and soul of the gas business. Price specifically affects every phase of the industry. Too low a price will result in short supplies as seen in the mid-1970s when natural gas was scarce and in tight supply. To fully understand the pricing of this energy commodity, it is important to understand the total energy picture. In addition, the effect and impact of world and US economies, and economics in general are crucial to understanding natural gas pricing. The purpose of this presentation will be to show the parameters going into US natural gas pricing including the influence of the many outside industry factors like crude oil and coal pricing, market drivers pushing the gas industry, supply/demand parameters, risk management for buyers and sellers, and other elements involved in pricing analysis

  8. Drug Pricing Reforms

    DEFF Research Database (Denmark)

    Kaiser, Ulrich; Mendez, Susan J.; Rønde, Thomas

    2015-01-01

    Reference price systems for prescription drugs have found widespread use as cost containment tools. Under such regulatory regimes, patients co-pay a fraction of the difference between pharmacy retail price of the drug and a reference price. Reference prices are either externally (based on drug...... prices in other countries) or internally (based on domestic drug prices) determined. In a recent study, we analysed the effects of a change from external to internal reference pricing in Denmark in 2005, finding that the reform led to substantial reductions in prices, producer revenues, and expenditures...... for patients and the health insurance system. We also estimated an increase in consumer welfare but the size effect depends on whether or not perceived quality differences between branded and other drugs are taken into account....

  9. Monitoring What Governments “Give for” and “Spend on” Vaccine Procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline

    OpenAIRE

    Nelson, E. A. S.; Bloom, David E.; Mahoney, Richard T.

    2014-01-01

    BACKGROUND: The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of...

  10. NUKEM adjusts price definitions

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This article is the October-November 1994 market report, providing trading volume and prices in the Uranium market. During this period, there were five deals in the spot concentrates market, five deals in the medium and long-term market, one deal in the conversion market, and two deals in the enrichment market. Restricted prices strengthened while unrestricted prices held steady. Price re-definitions were also announced

  11. Delegating Pricing Decisions

    OpenAIRE

    Pradeep Bhardwaj

    2001-01-01

    An outstanding problem in marketing is why some firms in a competitive market delegate pricing decisions to agents and other firms do not. This paper analyzes the impact of competition on the delegation decision and, in turn, the impact of delegation on prices and incentives. The theory builds on the simplest framework of competition in two dimensions: prices and (sales agents') effort. Specifically, we are interested in answering the following questions: (1) Does competition affect the price...

  12. E-PROCUREMENT AS AN INSTRUMENT FOR HOTEL SUPPLY CHAIN MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Lidija Pulevska IVANOVSKA

    2007-06-01

    Full Text Available The flow of goods, services, and information in the hotel industry, should be designed in a way that enables efficient transformation of raw materials into finished products or services with values. Procurement technology plays a vital role in the hotel business, because hotels usually purchase a large quantity of supplies for maintaining daily operations and quality. Today, a major goal of a hotel’s supply chain management is to efficiently apply information technology to its procurement systems. Moving away from traditional offline purchase processing to online sequencing presents significant savings, improved productivity and enhanced operational efficiencies. Better communication between hotels and suppliers and support services may provide more favourable price offerings and related activities for the hotels customers. This article elaborates the e-procurement as a very useful instrument for the hotel supply chain management following the approach of Kothari et al.

  13. Platelet count kinetics following interruption of antiretroviral treatment

    DEFF Research Database (Denmark)

    Zetterberg, Eva; Neuhaus, Jacqueline; Baker, Jason V

    2013-01-01

    To investigate the mechanisms of platelet kinetics in the Strategies for Management of Antiretroviral Therapy (SMART) study that demonstrated excess mortality with CD4 guided episodic antiretroviral therapy (ART) drug conservation compared with continuous treatment viral suppression. Follow...

  14. The association between HIV, antiretroviral therapy, and gestational diabetes mellitus

    NARCIS (Netherlands)

    Soepnel, Larske M; Norris, Shane A; Schrier, Verena J M M; Browne, Joyce L; Rijken, Marcus J; Gray, Glenda; Klipstein-Grobusch, Kerstin

    2017-01-01

    OBJECTIVES: The widespread, chronic use of antiretroviral therapy raises questions concerning the metabolic consequences of HIV infection and treatment. Antiretroviral therapy, and specifically protease inhibitors, has been associated with hyperglycemia. As pregnant women are vulnerable to

  15. Transportation Service Procurement Bid Construction Problem from Less Than Truckload Perspective

    Directory of Open Access Journals (Sweden)

    Fang Yan

    2018-01-01

    Full Text Available This paper presents mixed integer programming for a transportation service procurement bid construction problem from a less than full truckload perspective, in which the bidders (carriers generate their best bid (package using a bundled price to maximize their utility and increase the chance of winning the business. The models are developed from both the carriers and shippers perspectives to establish a relationship between the quoted price and the likelihood of winning to assist the carriers in balancing the potential benefits and the possibility of winning the bid. An intelligent algorithm based on Particle Swarm Optimization is then designed to solve the proposed model and hypothetical data sets are used to test the effectiveness and efficiency of the proposed model and algorithm.

  16. Price competition on graphs

    NARCIS (Netherlands)

    Soetevent, A.R.

    2010-01-01

    This paper extends Hotelling's model of price competition with quadratic transportation costs from a line to graphs. I propose an algorithm to calculate firm-level demand for any given graph, conditional on prices and firm locations. One feature of graph models of price competition is that spatial

  17. Press point on prices

    International Nuclear Information System (INIS)

    Schilansky, J.L.

    2005-06-01

    This document presents information and statistical data on the prices of the crude oils, refining and petroleum products, at the date of the 28 June 2005: evolution of the barrel price, supply and demand, geo-policy, consumption, diesel and gasoline, prices at the service station. (A.L.B.)

  18. Price control and macromarketing

    Directory of Open Access Journals (Sweden)

    Kancir Rade

    2003-01-01

    Full Text Available Price control at macro level is part of integral macro marketing strategic control system, or more precisely, part of social marketing mix control. Price impact is direct, if it is regarded in the context of needs satisfaction, and indirect, within the context of resource allocation. These two patterns of price impact define control mechanism structuring. Price control in sense of its direct impact at process of need satisfaction should comprise qualitative and quantitative level of needs satisfaction at a given price level and its structure, informational dimension of price and different disputable forms of corporate pricing policies. Control of price allocation function is based at objectives of macro marketing system management in the area of resource allocation and the role of price as allocator in contemporary market economies. Control process is founded, on one hand, at theoretical models of correlation between price and demand in different market structures, and on the other hand, at complex limits that price as allocator has, and which make whole control process even more complex because of reduction of the degree of determinism in functioning of contemporary economic systems. Control of price allocation function must be continuous and dynamic process if it is to provide for convergence with environmental changes and if it is to provide for placing control systems at micro marketing levels in the function of socially valid objectives.

  19. Simulating Price-Taking

    Science.gov (United States)

    Engelhardt, Lucas M.

    2015-01-01

    In this article, the author presents a price-takers' market simulation geared toward principles-level students. This simulation demonstrates that price-taking behavior is a natural result of the conditions that create perfect competition. In trials, there is a significant degree of price convergence in just three or four rounds. Students find this…

  20. Dutch house price fundamentals

    NARCIS (Netherlands)

    Haffner, M.E.A.; de Vries, P.

    2009-01-01

    This paper discusses house price developments in the Netherlands, specifically focussing on the question whether current house prices in the Dutch owner-occupied market are likely to decrease. We analyse three aspects of the question based on a literature review: (1) whether there is a house price

  1. Analyzing the effects of past prices on reference price formation

    OpenAIRE

    van Oest, R.D.; Paap, R.

    2004-01-01

    textabstractWe propose a new reference price framework for brand choice. In this framework, we employ a Markov-switching process with an absorbing state to model unobserved price recall of households. Reference prices result from the prices households are able to remember. Our model can be used to learn how many prices observed in the past are used for reference price formation. Furthermore, we learn to what extent households have sufficient price knowledge to form an internal reference price...

  2. Collaborative procurement for developing a sustainable campus

    Science.gov (United States)

    Nifa, Faizatul Akmar Abdul; Rahim, Syukran Abdul; Rani, Wan Nurul Mardiah Wan Mohd; Ismail, Mohd. Noorizhar

    2016-08-01

    It is particularly challenging to achieve sustainability in campus universities, where a high volume of users and activities has made it more imperative to promote green buildings that reduce energy and water consumption while having a minimal carbon footprint. At present, the frameworks for sustainable campus have seldom focused on the project procurement method which would improve construction team integration in developing the physical aspect of campus development. Therefore, in response to that challenge, this paper investigates how the delivery team, responsible for the design and construction of a project, can be integrated to work together more efficiently and more using the collaborative procurement method known as partnering. This paper reports part of a previous research and sets the base for ongoing research on the critical factors in partnering for sustainable campus development. The outcome or result of this study will meet and support the requirement for construction, maintenance, and operation process for universities towards sustainable building/campus in the future.

  3. Green related practices for construction procurement

    Science.gov (United States)

    Bidin, Z. A.; Bohari, A. A. M.; Rais, S. L. A.; Saferi, M. M.

    2018-04-01

    Environment degradation issue has been a worldwide problem and various efforts have been done to minimise the problem. Construction sectors are pointed as one of the major contributors to its construction activities. Green-oriented procurement [GP] is considered as an environmental strategy to integrate the environmental practices into the construction delivery. Thus, this paper reviews the concept of GP and the practices related to it. The outcome of this research findings provides a basis for understanding the concept of GP and the further development of GP. The listed GP practices identified from this paper can serve as guidelines for industry practitioners to design, implement, and benchmarking the green practices in their procurement delivery.

  4. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2011-01-01

    A major study of facilities management best practice covering 36 cases from the Nordic countries in Europe shows, that the most outstanding examples of innovation in FM are initiated from the demand side and involves new forms of procurement with long term contracts. This paper considers in depth......-called operational partnerships with private providers concerning all municipal buildings and sports facilities in parts of a city. Each of the case studies has involved both the client and the provider side of the collaboration. The cases show that an essential element in a successful procurement and partnership...... is that the client allows the providers freedom to plan their activities. Thereby the providers can optimize the use of their productive capacity and utilize their competences with incentives to profit from such improvements. A major challenge is to balance the risks between the client and provider and to create...

  5. Internet resource pricing models

    CERN Document Server

    Xu, Ke; He, Huan

    2013-01-01

    This brief guides the reader through three basic Internet resource pricing models using an Internet cost analysis. Addressing the evolution of service types, it presents several corresponding mechanisms which can ensure pricing implementation and resource allocation. The authors discuss utility optimization of network pricing methods in economics and underline two classes of pricing methods including system optimization and entities' strategic optimization. The brief closes with two examples of the newly proposed pricing strategy helping to solve the profit distribution problem brought by P2P

  6. Value-based pricing

    Directory of Open Access Journals (Sweden)

    Netseva-Porcheva Tatyana

    2010-01-01

    Full Text Available The main aim of the paper is to present the value-based pricing. Therefore, the comparison between two approaches of pricing is made - cost-based pricing and value-based pricing. The 'Price sensitively meter' is presented. The other topic of the paper is the perceived value - meaning of the perceived value, the components of perceived value, the determination of perceived value and the increasing of perceived value. In addition, the best company strategies in matrix 'value-cost' are outlined. .

  7. Antiretroviral therapy programme on control of HIV transmission in ...

    African Journals Online (AJOL)

    Antiretroviral therapy programme on control of HIV transmission in Morogoro municipality, Tanzania: A challenge for development. ... The government and partners should improve access to ART services to enable many PLHIV to access the services. Key words: Antiretroviral Therapy, Highly Active Antiretroviral Treatment, ...

  8. Public Procurement: A performance management perspective

    OpenAIRE

    Klevensparr, Johan

    2016-01-01

    Purpose - The purpose of this thesis is to explore what performance indicators that exist within public procurement in defence sector context and how such performance indicators can be categorized.   Methodology - For the purpose of this thesis, an abductive approach was applied. This thesis is characterized as an exploratory multimethod qualitative research, which emphasize a single case study and a comprehensive research literature review. The empirical data was collected using semi-structu...

  9. Socially Responsible Award of the Procurement Contracts

    OpenAIRE

    Hristina Blagoycehva

    2013-01-01

    With the Europe 2020 strategy the EU has set itself, under conditions of a changing world, the goal of becoming an intelligent, sustainable and inclusive economy. Under the current conditions of budget constraints and economic difficulties the conventional mechanisms for promoting social justice and social cohesion are insufficient. Through the inclusion of social criteria in the awarding of public procurement there can be guaranteed the compliance with social insurance legislation, furthered...

  10. Volatile behaviour of enrichment uranium in the total nuclear fuel price

    International Nuclear Information System (INIS)

    Arnaiz, J.; Inchausti, J. M.; Tarin, F.

    2004-01-01

    In this article the historical high volatile behaviour of the total nuclear fuel price is evaluated quantitatively and it is concluded that it has been due mainly to the fluctuations of the price of the principal components of enriched uranium (concentrates and enrichment). In order to avoid the negative effects of this volatiles behaviour as far as possible, a basic strategy in the uranium procurement activities is recommended (union of buyers, diversification of supplier, stock management, optimisation of contract portfolio and suitable currency management that guarantees a reliable uranium supply at reasonable prices. These guidelines are those that ENUSA has been following on behalf of the Spanish Utilities in the Commission of Uranium Procurement (CAU in Spanish). (Author) 11 refs

  11. Innovation, Procurement and Construction Industry Development

    Directory of Open Access Journals (Sweden)

    Geard de Valence

    2010-12-01

    Full Text Available The implications for analysis of innovation in construction of theoretical developments in industrial organisation are considered in this research, as an attempt to outline a new approach to construction innovation incorporating the ideas found in knowledge based, technology centred models. The paper firstly summarises characteristics of the construction industry, focusing on their effects on innovation, before surveying some of the ideas about the sources of innovation and the expansion and application of knowledge. Construction can be seen as an industry with limited scope for knowledge externalities, where the procurement methods used by the industry’s clients do not pay for innovation. The following discussion uses recent developments in the research on the economics of innovation and industrial organization theory, such as research intensity and the endogenous sunk costs in competitive, fragmented, low research intensity industries. The effects on R&D of procurement methods and on industry structure are discussed, with a focus on the appropriability of innovations and the role of the client on the Heathrow Terminal 5 project. The paper concludes that the procurement methods used for building and construction projects appears to be a determining factor in the level of innovation in the construction industry

  12. New harvesting technology in forest fuel procurement

    Energy Technology Data Exchange (ETDEWEB)

    Raitila, J. (VTT Technical Research Centre of Finland, Jyvaeskylae (Finland)), Email: jyrki.raitila@vtt.fi; Kaerhae, K. (Metsaeteho Oy, Helsinki (Finland)), Email: kalle.karha@metsateho.fi; Jylhae, P. (Finnish Forest Research Inst., Kannus (Finland)), Email: paula.jylha@metla.fi; Laitila, J. (Finnish Forest Research Inst., Joensuu (Finland)), Email: juha.laitila@metla.fi

    2009-07-01

    In order to increase the use of forest fuels, a regional development project was launched in the fall of 2008. The co-ordinator of the project is Metsaekeskus Keski-Suomi (Forestry Centre of Central Finland), while VTT (Technical Research Centre of Finland) is in charge of research and technical development. The aim of this project is to enhance energy wood procurement from early thinnings, to develop the supply chains of pine stump extraction, and to reduce storage losses of energy wood at roadside landings and at terminals. The results of a pre-feasibility study on the first-generation feller-bundler (Fixteri) by Metsaeteho Oy and the Finnish Forest Research Institute indicates that whole-tree bundling might enable undercutting of the current costs of separate procurement of pulp-wood and energy wood from first-thinning stands. The greatest cost-saving potential lies in small-diameter (d{sub 1.3} = 7-10 cm) first-thinning stands, which are currently relatively unprofitable sites for conventional pulpwood procurement based on single-tree harvesting. Preliminary tests of seasoning of whole-tree bundles have been very encouraging. In some cases the moisture content of energy wood bundles has decreased from 55 % to 25 % after about year of seasoning at the roadside (two summers). One of the most promising devices for pine stump harvesting was developed by Karelian Puu ja Metalli Oy. (orig.)

  13. Paid organ procurement: pragmatic and ethical viewpoints.

    Science.gov (United States)

    Daar, A S

    2004-09-01

    None of the familiar arguments against paid organ procurement really works. Most arguments spring from revulsion that arises from the abuses of the practice rather than the act itself. This has not stopped official condemnation. However, the evidence we have at present is that such condemnation, aimed at correcting a perceived moral wrong rather than at abuses of a practice (the correction of which might actually bring some moral good), has utterly failed, and many more countries including the United States now harbor paid organ procurement. We can try to develop and articulate a truly compelling moral argument against paid organ procurement or we can try to minimize the harm that comes out of this practice. Since it is unlikely that all countries will agree on a standardized approach in such a muddled field, the best way may be to let every country decide on what is best for itself. Some may want to ban the practice using legislation. Others may want to try regulating the practice, knowing full well that they cannot stop it and that turning a blind eye to the practice, or simply condemning it, does no good whatsoever and actually increases the harm because everything is done underground, with middlemen and mafia-like organizations making a lot of money out of a lot of misery. Some countries may choose to find other, more innovative solutions. We call attention to an important resolution dealing with this subject at the December 2002 ethics and transplantation congress in Munich.

  14. MODELLING OF FINANCIAL EFFECTIVENESS AND COMPARATIVE ANALYSIS OF PUBLIC-PRIVATE PARTNERSHIP PROJECTS AND PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Kuznetsov Aleksey Alekseevich

    2017-10-01

    following methods were applied in the research: general scientific theoretical methods, such as idealization and formalization; general scientific experimental methods, such as modelling of objects under study. Results: the main result of this research is development of modelling for comparative analysis of PPP projects and traditional public procurement. This enables us to estimate the “price-quality” ratio and, based on it, analyze critical parameters of the project. Conclusions: despite the objective complexity of the analysis of effectiveness of PPP projects both individually and especially when compared with traditional forms of public procurement, there is a relatively simple way to perform such an analysis by means of modelling and comparison of cash flows of all parties of the PPP process. Proposed model makes the criteria for PPP projects effectiveness more intuitive for interpretation while preserving all key parameters. The relative simplicity of the analysis, calculation of limiting values, and interpretation of the results make the model a useful practical tool both for bodies of the public sector and potential private investors.

  15. The Informing Needs of Procurement Officers in Israel

    Directory of Open Access Journals (Sweden)

    Yahel Giat

    2017-06-01

    Full Text Available Aim/Purpose: To develop and introduce a questionnaire that investigates the informing needs, information-seeking behavior, and supplier selection of procurement officers in Israel. The questionnaire’s internal consistency reliability is given. Additionally, we describe the demographic description of the procurement officers in Israel. Background: Procurement science is an important field that affects firms’ profits in the private sector and is significant to growth, innovation, sustainability, and welfare in the public sector. There is little research about the informing needs of procurement officers in general and particularly in Israel. Methodology: A quantitative questionnaire that is sent to all the procurement officers in Israel’s procuring association. Contribution: The questionnaire that is developed in this paper may be used by other researchers and practitioners to evaluate the information needs of procurement officers. Findings: The typical procurement officer is male, with a bachelor degree and is digitally proficient. Recommendations for Practitioners: The procuring side can use the questionnaire to develop better tools for obtaining information efficiently. The supplying side can use this knowledge to improve its exposure to potential customers and address its customer’s needs better. Recommendation for Researchers: The questionnaire can address theoretical questions such as how digital literacy affects the procuring process and provide empirical findings about active research areas such as supplier selection and information-seeking behavior. Future Research: Future research will examine the relationship between the various variables and demographic features to understand why specific information needs and information-seeking behaviors arise.

  16. Government procurement of peak capacity in the New Zealand electricity market

    International Nuclear Information System (INIS)

    Poletti, Steve

    2009-01-01

    This paper analyzes the impact of government procurement of reserve electricity generation capacity on the long-run equilibrium in the electricity market. The approach here is to model the electricity market in a context where the supply companies have market power. The model is then used to analyze the impact of government direct supply of peak capacity on the market. We find that the firms build less peak-generation capacity when the government procures peak generating capacity. The long-run equilibrium with N firms and government capacity of K G results in an increase of total peak generation capacity of K G /(N+1) compared to the long-run equilibrium with no government capacity. Supply disruptions of baseline capacity during the peak time period are also considered. It is found that peak prices do not go up any further with (anticipated) supply disruptions. Instead the entire cost of the extra peakers is borne by customers on traditional meters and off-peak customers who face real-time pricing. (author)

  17. A theoretical analysis of procurement auctions for tertiary control in Germany

    International Nuclear Information System (INIS)

    Mueller, Gernot; Rammerstorfer, Margarethe

    2008-01-01

    As far as energy policy is concerned, the design of the regulatory framework for energy transmission and distribution is a key issue. Consequently, also the embodiment of balancing power markets drives mainly the effectiveness of political implications for the energy sector. Initially, tertiary control in Germany was solely offered by transmission system operators of the respective power control areas and their associated power plant. The recast of the Energy Industry Act of 2005 led in last consequence to a common procurement auction for the supply of tertiary control, which starts on December 1, 2006. Admittedly, the reform has fallen short of expectations so far, first concerning the intensification of market entry of tertiary control providers as well as the desired decline of the price level. Hence, this article examines the effects of the changeover on observable demand charges. In order to identify attributes of the common procurement auction for tertiary control hampering market entry of providers, giving stimuli to collusion and strategic behavior, reducing intensity of competition and encouraging an upswing of prices, we analyze the design under an auction theoretical approach and deduce empirically whether structural components of the auction design have to be touched up again

  18. What Canada could learn from U.S. defence procurement: Issues, best practices and recommendations

    Directory of Open Access Journals (Sweden)

    Anessa L. Kimball

    2015-04-01

    Full Text Available Despite differences in scale, Canada and the U.S. face common challenges in military procurement and there is much Canada can learn as both countries pursue reforms. The U.S. employs a system of systems approach, based on requirements, resource allocation and acquisition. The process begins with the Joint Capabilities and Development System, focused on identifying and prioritizing needs and assessing alternatives. This is followed by the Planning, Programming, Budgeting and Execution System, which leads to the creation of a budget and provides guidance for the project’s execution. The third and final step is the Defense Acquisition System, which oversees the development and purchase of the new equipment. While deceptively simple in summary, U.S. defence procurement is dogged by problems — particularly cost overruns, a surfeit of key players and delayed schedules which degrade troops’ performance in the field. Additionally, the defence products market is restricted, inevitably limiting competition, encouraging misbehaviour on the part of business and driving up prices. The DoD is in the midst of consultations with contractors and Congress is undertaking an effort to rewrite acquisition laws. But the most pressing questions remain: Does a best procurement practice exist? If so, what criteria define it? In light of Canada’s new Defence Procurement Strategy (DPS, some lessons are clear. Further analysis is needed to figure out whether reforms can succeed in so narrow a marketplace. More attention must be paid to shaping contracts and clarifying expectations about sticking to schedules. And Ottawa must think carefully about the military’s needs, as it pushes ahead with the DPS. In surveying change at the DoD, this brief draws pointed conclusions to which Canada’s defence planners must pay heed, if they’re to leave the military stronger than they found it.

  19. Value-based procurement of medical devices: Application to devices for mechanical thrombectomy in ischemic stroke.

    Science.gov (United States)

    Trippoli, Sabrina; Caccese, Erminia; Marinai, Claudio; Messori, Andrea

    2018-03-01

    In the acute ischemic stroke, endovascular devices have shown promising clinical results and are also likely to represent value for money, as several modeling studies have shown. Pharmacoeconomic evaluations in this field, however, have little impact on the procurement of these devices. The present study explored how complex pharmacoeconomic models that evaluate effectiveness and cost can be incorporated into the in-hospital procurement of thrombectomy devices. As regards clinical modeling, we extracted outcomes at three months from randomized trials conducted for four thrombectomy devices, and we projected long-term results using standard Markov modeling. In estimating QALYs, the same model was run for the four devices. As regards economic modeling, we firstly estimated for each device the net monetary benefit (NMB) per patient (threshold = $60,000 per QALY); then, we simulated a competitive tender across the four products by determining the tender-based score (on a 0-to-100 scale). Prices of individual devices were obtained from manufacturers. Extensive sensitivity testing was applied to our analyses. For the four devices (Solitaire, Trevo, Penumbra, Solumbra), QALYs were 1.86, 1.52, 1,79, 1.35, NMB was $101,824, $83,546, $101,923, $69,440, and tender-based scores were 99.70, 43.43, 100, 0, respectively. Sensitivity analysis confirmed findings from base-case. Our results indicate that, in the field of thrombectomy devices, incorporating the typical tools of cost-effectiveness into the processes of tenders and procurement is feasible. Bridging the methodology of cost-effectiveness with the every-day practice of in-hospital procurement can contribute to maximizing the health returns that are generated by in-hospital expenditures for medical devices. Copyright © 2018 Elsevier B.V. All rights reserved.

  20. Delivery of antiretroviral treatment services in India: Estimated costs incurred under the National AIDS Control Programme.

    Science.gov (United States)

    Agarwal, Reshu; Rewari, Bharat Bhushan; Shastri, Suresh; Nagaraja, Sharath Burugina; Rathore, Abhilakh Singh

    2017-04-01

    Competing domestic health priorities and shrinking financial support from external agencies necessitates that India's National AIDS Control Programme (NACP) brings in cost efficiencies to sustain the programme. In addition, current plans to expand the criteria for eligibility for antiretroviral therapy (ART) in India will have significant financial implications in the near future. ART centres in India provide comprehensive services to people living with HIV (PLHIV): those fulfilling national eligibility criteria and receiving ART and those on pre-ART care, i.e. not on ART. ART centres are financially supported (i) directly by the NACP; and (ii) indirectly by general health systems. This study was conducted to determine (i) the cost incurred per patient per year of pre-ART and ART services at ART centres; and (ii) the proportion of this cost incurred by the NACP and by general health systems. The study used national data from April 2013 to March 2014, on ART costs and non-ART costs (human resources, laboratory tests, training, prophylaxis and management of opportunistic infections, hospitalization, operational, and programme management). Data were extracted from procurement records and reports, statements of expenditure at national and state level, records and reports from ART centres, databases of the National AIDS Control Organisation, and reports on use of antiretroviral drugs. The analysis estimates the cost for ART services as US$ 133.89 (?8032) per patient per year, of which 66% (US$ 88.66, ?5320) is for antiretroviral drugs and 34% (US$ 45.23, ?2712) is for non-ART recurrent expenditure, while the cost for pre-ART care is US$ 33.05 (?1983) per patient per year. The low costs incurred for patients in ART and pre-ART care services can be attributed mainly to the low costs of generic drugs. However, further integration with general health systems may facilitate additional cost saving, such as in human resources.

  1. 2016 Status Report on Major Equipment Procurement

    Directory of Open Access Journals (Sweden)

    David Perry

    2017-09-01

    Full Text Available The Department of National Defence made some progress in procurement in 2016 despite obstacles that included a continued drop in spending, the advent of a new federal Liberal government and uncertainty over the outcome of the Defence Policy Review. Four trends affected defence acquisitions in 2016. These include an ongoing slippage in recapitalizing the Canadian Armed Forces, some encouraging moves made on the shipbuilding and fighter jet files, mixed progress on implementing the 2014 Defence Procurement Strategy, and uncertainty over the Defence Policy Review. It is also too early to tell how the Trudeau government’s Policy on Results, known as the “deliverology” approach, will play out for defence procurement. However, Budget 2016’s major focus was not on defence, and it shifted some funding for capital equipment to a new endpoint of 2045. This suggests that delay in the overall defence procurement program continues. While the Liberals kept their pledge to make investment in the Royal Canadian Navy a priority, they also made good last year on a negative promise – not to purchase the F-35 stealth fighter bomber. However, further slowing things is the Liberals’ refusal to launch a competition to replace it until the Defence Policy Review is published. The government has made this situation more fraught with its intention to buy 18 Boeing Super Hornet fighter jets as interim aircraft, since Liberal policy requires the Royal Canadian Air Force to be capable of meeting both NORAD’s and NATO’s operational needs simultaneously. Prior to the release of the new defence policy, both the interim and permanent fighter aircraft projects lacked adequate funding. They were among several large projects that have been approved, but have not yet moved to the contract stage, and whose budgets were inadequate to move forward. Adding to this mix is the fact that a government-wide effort initiated in 2014 to streamline the defence procurement

  2. Health and federal budgetary effects of increasing access to antiretroviral medications for HIV by expanding Medicaid.

    Science.gov (United States)

    Kahn, J G; Haile, B; Kates, J; Chang, S

    2001-09-01

    OBJECTIVES. This study modeled the health and federal fiscal effects of expanding Medicaid for HIV-infected people to improve access to highly active antiretroviral therapy. A disease state model of the US HIV epidemic, with and without Medicaid expansion, was used. Eligibility required a CD4 cell count less than 500/mm3 or viral load greater than 10,000, absent or inadequate medication insurance, and annual income less than $10,000. Two benefits were modeled, "full" and "limited" (medications, outpatient care). Federal spending for Medicaid, Medicare, AIDS Drug Assistance Program, Supplemental Security Income, and Social Security Disability Insurance were assessed. An estimated 38,000 individuals would enroll in a Medicaid HIV expansion. Over 5 years, expansion would prevent an estimated 13,000 AIDS diagnoses and 2600 deaths and add 5,816 years of life. Net federal costs for all programs are $739 million (full benefits) and $480 million (limited benefits); for Medicaid alone, the costs are $1.43 and $1.17 billion, respectively. Results were sensitive to awareness of serostatus, highly active antiretroviral therapy cost, and participation rate. Strategies for federal cost neutrality include Medicaid HIV drug price reductions as low as 9% and private insurance buy-ins. Expansion of the Medicaid eligibility to increase access to antiretroviral therapy would have substantial health benefits at affordable costs.

  3. Optimal Sizing of Energy Storage Systems for the Energy Procurement Problem in Multi-Period Markets under Uncertainties

    Directory of Open Access Journals (Sweden)

    Ryusuke Konishi

    2018-01-01

    Full Text Available In deregulated electricity markets, minimizing the procurement costs of electricity is a critical problem for procurement agencies (PAs. However, uncertainty is inevitable for PAs and includes multiple factors such as market prices, photovoltaic system (PV output and demand. This study focuses on settlements in multi-period markets (a day-ahead market and a real-time market and the installation of energy storage systems (ESSs. ESSs can be utilized for time arbitrage in the day-ahead market and to reduce the purchasing/selling of electricity in the real-time market. However, the high costs of an ESS mean the size of the system needs to be minimized. In addition, when determining the size of an ESS, it is important to identify the size appropriate for each role. Therefore, we employ the concept of a “slow” and a “fast” ESS to quantify the size of a system’s role, based on the values associated with the various uncertainties. Because the problem includes nonlinearity and non-convexity, we solve it within a realistic computational burden by reformulating the problem using reasonable assumptions. Therefore, this study identifies the optimal sizes of ESSs and procurement, taking into account the uncertainties of prices in multi-period markets, PV output and demand.

  4. ANALYSIS OF THE FOREIGN GOVERNMENT AND CORPORATE PROCUREMENT MANAGEMENT EXPERIENCE

    Directory of Open Access Journals (Sweden)

    Vladimir Vladimirovich Savchenko

    2016-01-01

    Full Text Available This article presents a synthesis of the experience of foreign government and corporate procurement management. Set out key aspects of the organization of procurement for government and corporate needs, disclosed issues of centralization and decentralization of procurement, as well as given clarifi cation of the concept of "procurement management system" and structured the main elements that make up this system. The purpose / goal. The purpose of the work is to study the nature and characteristics of the functioning of government and corporate experience in procurement management, identifying problems and prospects of its development. Methodology. To perform this work were used legal, comparative and statistical analysis methods. Results. As part of the presentation of the present article the author has examined the nature, objectives and stages of public and corporate procurement management.

  5. 7 CFR 1131.53 - Announcement of class prices, component prices, and advanced pricing factors.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Announcement of class prices, component prices, and advanced pricing factors. 1131.53 Section 1131.53 Agriculture Regulations of the Department of Agriculture... class prices, component prices, and advanced pricing factors. See § 1000.53. ...

  6. 7 CFR 1005.53 - Announcement of class prices, component prices, and advanced pricing factors.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Announcement of class prices, component prices, and advanced pricing factors. 1005.53 Section 1005.53 Agriculture Regulations of the Department of Agriculture... class prices, component prices, and advanced pricing factors. See § 1000.53. ...

  7. 7 CFR 1124.53 - Announcement of class prices, component prices, and advanced pricing factors.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Announcement of class prices, component prices, and advanced pricing factors. 1124.53 Section 1124.53 Agriculture Regulations of the Department of Agriculture... Announcement of class prices, component prices, and advanced pricing factors. See § 1000.53. ...

  8. 7 CFR 1126.53 - Announcement of class prices, component prices, and advanced pricing factors.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Announcement of class prices, component prices, and advanced pricing factors. 1126.53 Section 1126.53 Agriculture Regulations of the Department of Agriculture... class prices, component prices, and advanced pricing factors. See § 1000.53. ...

  9. 7 CFR 1032.53 - Announcement of class prices, component prices, and advanced pricing factors.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Announcement of class prices, component prices, and advanced pricing factors. 1032.53 Section 1032.53 Agriculture Regulations of the Department of Agriculture... class prices, component prices, and advanced pricing factors. See § 1000.53. ...

  10. 7 CFR 1030.53 - Announcement of class prices, component prices, and advanced pricing factors.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Announcement of class prices, component prices, and advanced pricing factors. 1030.53 Section 1030.53 Agriculture Regulations of the Department of Agriculture... of class prices, component prices, and advanced pricing factors. See § 1000.53. ...

  11. 7 CFR 1033.53 - Announcement of class prices, component prices, and advanced pricing factors.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Announcement of class prices, component prices, and advanced pricing factors. 1033.53 Section 1033.53 Agriculture Regulations of the Department of Agriculture... class prices, component prices, and advanced pricing factors. See § 1000.53. ...

  12. 7 CFR 1001.53 - Announcement of class prices, component prices, and advanced pricing factors.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Announcement of class prices, component prices, and advanced pricing factors. 1001.53 Section 1001.53 Agriculture Regulations of the Department of Agriculture... class prices, component prices, and advanced pricing factors. See § 1000.53. ...

  13. 7 CFR 1007.53 - Announcement of class prices, component prices, and advanced pricing factors.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Announcement of class prices, component prices, and advanced pricing factors. 1007.53 Section 1007.53 Agriculture Regulations of the Department of Agriculture... class prices, component prices, and advanced pricing factors. See § 1000.53. ...

  14. 7 CFR 1006.53 - Announcement of class prices, component prices, and advanced pricing factors.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 9 2010-01-01 2009-01-01 true Announcement of class prices, component prices, and advanced pricing factors. 1006.53 Section 1006.53 Agriculture Regulations of the Department of Agriculture... class prices, component prices, and advanced pricing factors. See § 1000.53. ...

  15. Antiretroviral therapy programme outcomes in Tshwane district ...

    African Journals Online (AJOL)

    Objectives. To ascertain patient retention on ART after 5 years on treatment in one district of Gauteng Province, SA, establish the number of patients ... A retrospective cohort study of patients initiated on highly active antiretroviral therapy (HAART) between January and March .... ferred-out patients from the total of 381 leaves.

  16. The discovery and development of antiretroviral agents

    NARCIS (Netherlands)

    Lange, Joep M. A.; Ananworanich, Jintanat

    2014-01-01

    Since the discovery of HIV as the causative agent of AIDS in 1983/1984, remarkable progress has been made in finding antiretroviral drugs (ARVs) that are effective against it. A major breakthrough occurred in 1996 when it was found that triple drug therapy (HAART) could durably suppress viral

  17. Perceived stigma and highly active antiretroviral treatment ...

    African Journals Online (AJOL)

    Perceived stigma and highly active antiretroviral treatment adherence among persons living with HIV/AIDS in the University of Port Harcourt Teaching Hospital. ... Data on socio-demographic characteristics, stigma and adherence to drug regimen were collected using a validated self-administered questionnaire. Data were ...

  18. Dual antiretroviral therapy for HIV infection.

    Science.gov (United States)

    Soriano, Vicente; Fernandez-Montero, Jose Vicente; Benitez-Gutierrez, Laura; Mendoza, Carmen de; Arias, Ana; Barreiro, Pablo; Peña, José M; Labarga, Pablo

    2017-08-01

    For two decades, triple combinations of antiretrovirals have been the standard treatment for HIV infection. The challenges of such lifelong therapy include long-term side effects, high costs and reduced drug adherence. The recent advent of more potent and safer antiretrovirals has renewed the interest for simpler HIV regimens. Areas covered: We discuss the pros and cons of dual antiretroviral therapies in both drug-naïve and in treatment-experienced patients with viral suppression (switch strategy). Expert opinion: Some dual antiretroviral regimens are safe and efficacious, particularly as maintenance therapy. At this time, combinations of dolutegravir plus rilpivirine represent the best dual regimen. Longer follow-up and larger study populations are needed before supporting dolutegravir plus lamivudine. In contrast, dual therapy based on maraviroc is less effective. Although dual regimens with boosted protease inhibitors plus either lamivudine or raltegravir may be effective, they are penalized by metabolic side effects and risk for drug interactions. The newest dual regimens could save money, reduce toxicity and spare drug options for the future. For the first time in HIV therapeutics, less can be more. Dual therapy switching has set up a new paradigm in HIV treatment that uses induction-maintenance.

  19. Insulin resistance induced by antiretroviral drugs: Current ...

    African Journals Online (AJOL)

    Treatment with highly active antiretroviral therapy (HAART) has improved the prognosis of patients with AIDS, but it has also increased the incidence of various metabolic disorders, in particular insulin resistance accompanied by dyslipidaemia, hyperglycaemia and lipodystrophy. This is often accompanied by frank type 2 ...

  20. CROI 2016: Advances in Antiretroviral Therapy.

    Science.gov (United States)

    Taylor, Barbara S; Olender, Susan A; Tieu, Hong-Van; Wilkin, Timothy J

    2016-01-01

    The 2016 Conference on Retroviruses and Opportunistic Infections highlighted exciting advances in antiretroviral therapy, including important data on investigational antiretroviral drugs and clinical trials. Clinical trials demonstrated benefits from a long-acting injectable coformulation given as maintenance therapy, examined intravenous and subcutaneous administration of a monoclonal antibody directed at the CD4 binding site of HIV-1, and provided novel data on tenofovir alafenamide. Several studies focused on the role of HIV drug resistance, including the significance of minority variants, transmitted drug resistance, use of resistance testing, and drug class-related resistance. Novel data on the HIV care continuum in low- and middle-income settings concentrated on differentiated HIV care delivery models and outcomes. Data on progress toward reaching World Health Organization 90-90-90 targets as well as outcomes related to expedited initiation of HIV treatment and adherence strategies were presented. Results from a trial in Malawi showed reduced rates of mother-to-child transmission among HIV-infected women who initiated antiretroviral therapy prior to pregnancy, and several studies highlighted the effect of antiretroviral therapy in pediatric populations. A special session was dedicated to the findings of studies of Ebola virus disease and treatment during the outbreak in West Africa.

  1. Arbitrage Pricing, Capital Asset Pricing, and Agricultural Assets

    OpenAIRE

    Louise M. Arthur; Colin A. Carter; Fay Abizadeh

    1988-01-01

    A new asset pricing model, the arbitrage pricing theory, has been developed as an alternative to the capital asset pricing model. The arbitrage pricing theory model is used to analyze the relationship between risk and return for agricultural assets. The major conclusion is that the arbitrage pricing theory results support previous capital asset pricing model findings that the estimated risk associated with agricultural assets is low. This conclusion is more robust for the arbitrage pricing th...

  2. Price strategy and pricing strategy: terms and content identification

    Directory of Open Access Journals (Sweden)

    Panasenko Tetyana

    2015-11-01

    Full Text Available The article is devoted to the terminology and content identification of seemingly identical concepts "price strategy" and "pricing strategy". The article contains evidence that the price strategy determines the direction, principles and procedure of implementing the company price policy and pricing strategy creates a set of rules and practical methods of price formation in accordance with the pricing strategy of the company.

  3. Public Procurement and the Development of the Swedish Telecommunications Market

    OpenAIRE

    Lindskog, Helena

    2008-01-01

    This thesis describes and analyses public procurement and its processes in general against the framework of industrial marketing and purchasing. In particular, it focuses on the public procurement of telecommunications (“telecom”) and its effects on the de-monopolization and development of the Swedish telecom market based on empirical material from three case studies, interviews and publicly available written sources. Public procurement is a significant part of any country’s economy. There is...

  4. Routines and Communities of Practice in Public Environmental Procurement Processes

    OpenAIRE

    Larsen, Katarina; Svane, Örjan

    2005-01-01

    Environmental procurement has received increasing attention as a policy tool promoting change towards sustainable consumption and production. The successful implementation of public environmental procurement policy requires the establishment of new routines for user-producer-supplier relationships that enable the integration of environmental aspects. The aim of the study is to analyse the roles of different communities of practice and learning patterns in environmental procurement processes. ...

  5. Improving the effectiveness of public entities procurement practices

    OpenAIRE

    2013-01-01

    M. Com. (Business Management) The media and the Auditor General have extensively reported on the ineffective and unethical conduct of public sector employees regarding the procurement of goods and services. The Auditor General’s report demonstrates that there is evidence that public sector procurement processes are less than adequate to achieve constitutional procurement goals, which are to conduct processes that are fair, equitable, transparent, competitive and cost-effective The delivery...

  6. Considerations regarding procurement activities in institutions of local authority

    OpenAIRE

    Mãdãlina ALBU

    2013-01-01

    Objectives which they propose a public authority requires, among others, providing the necessary resources, including the material occupy a large proportion. This is done through the public procurement system. The procurement is part of the legal and economic reality of the Romanian society and covers all rules and actions on public spending and the application launched by public bodies meets the proposed offer of an operator. This paper presents an analysis of the public procurement system i...

  7. Sustainable Public Procurement : a new policy paradigm in France ?

    OpenAIRE

    Le Velly, Ronan

    2010-01-01

    The purpose of this paper is to explore the “new paradigm” of sustainable public procurement in France, that is, its cognitive and normative frameworks. Firstly, the author shows that the newness of this paradigm has to do with the identification of sustainable procurement as a stake in its own right. Next, he shows that the good practices associated with sustainable procurement are also new (close relationships with suppliers, systematic thought about what is needed, innovative methods of co...

  8. Opportunities for public procurement procedures efficiency and optimization improvement

    OpenAIRE

    Junevičius, Algis; Ereminaitė, Simona

    2010-01-01

    Public procurement is one of the most actual problems of economics and a potential instrument of successful public policy, which can control money flows and manipulate the appearance of corruption opportunities. Procurement practices are relatively new in the public sector, but everyone knows the complicated regulation and coordination of this process. Despite the fact that society often discus about public procurement problems, the regulation of this process requires an in-depth evaluation b...

  9. STS pricing policy

    Science.gov (United States)

    Lee, C. M.; Stone, B.

    1982-01-01

    In 1977 NASA published Shuttle Reimbursement Policies for Civil U.S. Government, DOD and Commercial and Foreign Users. These policies were based on the principle of total cost recovery over a period of time with a fixed flat price for initial period to time to enhance transition. This fixed period was to be followed with annual adjustments thereafter, NASA is establishing a new price for 1986 and beyond. In order to recover costs, that price must be higher than the initial fixed price through FY 1985. NASA intends to remain competitive. Competitive posture includes not only price, but other factors such as assured launch, reliability, and unique services. NASA's pricing policy considers all these factors.

  10. Target Price Accuracy

    Directory of Open Access Journals (Sweden)

    Alexander G. Kerl

    2011-04-01

    Full Text Available This study analyzes the accuracy of forecasted target prices within analysts’ reports. We compute a measure for target price forecast accuracy that evaluates the ability of analysts to exactly forecast the ex-ante (unknown 12-month stock price. Furthermore, we determine factors that explain this accuracy. Target price accuracy is negatively related to analyst-specific optimism and stock-specific risk (measured by volatility and price-to-book ratio. However, target price accuracy is positively related to the level of detail of each report, company size and the reputation of the investment bank. The potential conflicts of interests between an analyst and a covered company do not bias forecast accuracy.

  11. Farmgate Private Standards and Price Premium: Evidence From the GlobalGAP Scheme in Kenya's French Beans Marketing

    OpenAIRE

    Kariuki, Isaac Maina; Loy, Jens-Peter; Herzfeld, Thomas

    2012-01-01

    The proliferation of private quality and assurance schemes in international trade is defining market access in high value chains. The prime concern for small-scale producers is whether price premiums are realizable due to compliance. Using French beans marketing, the authors find that GlobalGAP certification, produce traceability, number of suppliers, competition for supplies, direct procurement, a good road network, and supply contracts have positive farmgate price effects for smallholders. ...

  12. 15 CFR 14.46 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ... FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND...

  13. 22 CFR 518.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award... selection, (b) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  14. 43 CFR 12.946 - Procurement records.

    Science.gov (United States)

    2010-10-01

    ... With Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations Post-Award...) Justification for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  15. 49 CFR 19.46 - Procurement records.

    Science.gov (United States)

    2010-10-01

    ... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award... selection, (b) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  16. 7 CFR 550.48 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements... selection; (b) Justification for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  17. 77 FR 51522 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-08-24

    ..., Barricade, Yellow, ``CAUTION'', Premium Grade, 3''W x 1000'L COVERAGE: A-List for the Total Government... Contract OFC, Fort Belvoir, VA Patricia Briscoe, Deputy Director, Business Operations (Pricing and...

  18. Pricing of new vaccines

    OpenAIRE

    Lee, Bruce Y; McGlone, Sarah M

    2010-01-01

    New vaccine pricing is a complicated process that could have substantial long-standing scientific, medical and public health ramifications. Pricing can have a considerable impact on new vaccine adoption and, thereby, either culminate or thwart years of research and development and public health efforts. Typically, pricing strategy consists of the following eleven components: (1) Conduct a target population analysis; (2) Map potential competitors and alternatives; (3) Construct a vaccine targe...

  19. Land Prices and Fundamentals

    OpenAIRE

    Koji Nakamura; Yumi Saita

    2007-01-01

    This paper examines the long-term relationship between macro economic fundamentals and the weighted-average land price indicators, which are supposed to be more appropriate than the official land price indicators when analyzing their impacts on the macro economy. In many cases, we find the cointegrating relationships between the weighted-average land price indicators and the discounted present value of land calculated based on the macro economic fundamentals indicators. We also find that the ...

  20. Introduction to pricing issues

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This chapter provides an overview of pricing issues the proper pricing of transmission services is essential to efficient operation of the grid. Wheeling rights have little meaning if capacity on existing lines is scarce and there is no incentive to build new lines. Depending on the type of transmission pricing policies FERC adopts, the Commission may be able to encourage more voluntary wheeling service, and to influence decisions to build or upgrade the supply of facilities

  1. Cost and Price Collaboration

    Science.gov (United States)

    2016-04-30

    described below which relies on questionnaires administered to subject matter experts in both cost analysis and price analysis to determine the value of...additional reports or data that the price analyst used in determining their final negotiated position. The cost analyst section of the questionnaire...an analysis at the individual element level rather than at a total price level to determine the major changes from the awarded contract to the new

  2. Economic risks of the system of state and municipal procurement

    Directory of Open Access Journals (Sweden)

    Belokrylova Olga, S.

    2015-12-01

    Full Text Available In the paper the audit of economic risks at all stages of procurement for state and municipal needs from both customers and bidders is carried out on the basis of the implementation of the integrated approach . Stages in the procurement under a single contract system, which is characterized by the high economic risks are planning, supplier selection, conclusion and execution of the contract. A number of the measures according to the localization of economic risks are offered, in particular the implementation of compliance programs, which institutionalize the compliance by the organization, anti-corruption legislation; increasing qualification of specialists in public procurement and increased control through centralization of procurement.

  3. Challenges of public procurement in EU funded projects

    Directory of Open Access Journals (Sweden)

    Marko Šostar

    2017-01-01

    Full Text Available Membership in the European Union implies adjustment of EU projects to the rules of Structural Funds, but also adoption of legal regulations, thus influencing the process of implementation of the public procurement in EU funded projects. Each successful applicant who expressed the need for procurement of goods, services and works of a certain value, must respect the principles of public procurement. Irregularities in the procurement process can lead to the failure of returning the EU funds even several years after the end of the project. Therefore, the knowledge and proper implementation of public procurement is the main precondition for the correct implementation of each project. In order to obtain information about the current absorption capacity of the public procurement liable parties, and to identify key obstacles that stakeholders face in procurement procedures, the research was conducted by surveying 30 entities that are subject of public procurement in Croatia. Research results imply the poor quality of public procurement in the implemented projects, which often results in financial corrections, disapproving project reports, etc.

  4. Critical factors for sustainable food procurement in zoological collections.

    Science.gov (United States)

    Hanson, Jonathan H

    2015-01-01

    Food procurement can play an important role in sustainable food supply chain management by zoos, linking organizational operations to the biodiversity conservation and sustainability mission of zoological collections. This study therefore examines the critical factors that shape sustainable food procurement in zoo and aquariums. Using a web-based survey data was collected from 41 members of the British and Irish Association of Zoos and Aquariums (BIAZA). This included information on the sustainable food procurement practices of these institutions for both their human and animal food supply chains, as well as profile information and data on the factors contributing to and inhibiting sustainable procurement practices. Zoological collections operated by charities, and those with a certified sustainability standard, were found to have significantly higher levels of sustainable food procurement. Zoos and aquariums whose human food operations were not contracted to an external party were also found to have significantly higher levels of sustainable food procurement in their human food supply chain. The most important drivers of sustainable food procurement were cost savings, adequate financial support and improved product quality. The highest ranking barriers were higher costs, other issues taking priority and a lack of alternative suppliers. The results suggest that a number of critical factors shape sustainable food procurement in zoological collections in the British Isles. Financial factors, such as cost savings, were important considerations. The significance of mission-related factors, such as charity status, indicated that core values held by zoos and aquariums can also influence their food procurement practices. © 2015 Wiley Periodicals, Inc.

  5. THE EFFECTIVENESS OF BUDGET ALLOCATION IN PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Irina Yu. Fedorova

    2015-01-01

    Full Text Available This article deals with the problem of budget allocation in the state order inRussia. Assesses the effectiveness of the financial mechanism of the public procurement business entities, purchasing activities are regulated by Federal Law №44-FZ and №223-FZ. The dynamics of financing the procurement process and reveal its features by using the most common methods of procurement through competitive bidding and without bidding. Identifies the causes of inefficient spending budget as a result of the non-competitive procurement methods by certain categories of business entities. 

  6. Playing the game of public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Given the emergence and diffusion of policies aiming at promoting the utilisation of public procurement as an innovation policy instrument, it is remarkable that very little scholarly attention has been given to the teaching of public procurement of innovation. This paper sets out to contribute...... towards mending this gap, by discussing some considerations made in the context of the development and set up of a university course in public procurement of innovation. A major challenge for such an endeavour is how to bring the complexities of real-life public procurement into a university class...

  7. E-Procurement and the U.S. Military

    National Research Council Canada - National Science Library

    Doe, David

    2002-01-01

    .... Meanwhile, companies worldwide are undergoing transformation as they harness the power of Internet-enabled tools, One significant aspect of industry's transformation is electronic or e-procurement...

  8. 75 FR 1355 - Procurement List Additions and Deletions

    Science.gov (United States)

    2010-01-11

    .../Location: Janitorial Services, Jamestown Service Center, 8430 Country Club Street, Jamestown, ND. NPA..., the following products and services are deleted from the Procurement List: Products Business Cards NSN...

  9. SCAlING UP THE USE OF ANTIRETROVIRAlS IN THE PUBLIC ...

    African Journals Online (AJOL)

    2003-08-01

    Aug 1, 2003 ... access also has to grapple with the challenge of ensuring that people take drugs ... scaling up procurement: provision of affordable drugs, and ... outside government. ... South Africa provide useful models for the design of an.

  10. Development of modified rational buyer auction for procurement of ancillary services utilizing participation matrix

    International Nuclear Information System (INIS)

    Jamalzadeh, R.; Ardehali, M.M.; Rashidinejad, M.

    2008-01-01

    The rational buyer auction is based on a simultaneous auction that is the redesigned auction mechanism for ancillary services by the California independent system operator (CAISO). The incentive for the rational buyer auction is CAISO's intent to adopt a common sense rule of substituting higher-quality lower-cost services for lower-quality higher-cost services, when it results in reduced total procurement cost. For the purposes of designing a desirable auction where the minimum cost for the objective function as well as prevention of price reversal are achieved, either the payment cost in marginal pricing auction must be lowered or price reversal in rational buyer auction must be avoided. The objectives of this study are (a) to develop a newly proposed 'modified rational buyer' auction that does not allow price reversal and (b) to propose and validate a solution procedure that is based on participation matrix and discrete programming. The validation of the proposed solution procedure is accomplished through examination of two case studies available in the literature. Based on the first case study data, it is shown that the newly developed modified rational buyer auction avoids price reversal occurrence, while the total payment of ISO is increased by 5.8%, as compared with rational buyer auction. Also in comparison with marginal pricing auction, the ISO payment is lowered by 38.8%, when the newly developed modified rational buyer auction is utilized. For future work, it is recommended that the application of the modified rational buyer auction to joint dispatch of energy and ancillary services is investigated

  11. 1988 coal price negotiation

    Energy Technology Data Exchange (ETDEWEB)

    Senmura, Akira

    1988-12-01

    In the negotiation on raw coal price for 1988, which began at the end of 1987, Australia requested price rise of 4 - 5 dollars for the reason of rise of Australian dollars, conditions of mines, price drop in the past five years, and world supply/demand of coal. Japan insisted to maintain the price of preceding year. The talk ended in a dead lock which could last a long time. Negotiation on the Canadian coal price also encountered difficulties but an agreement was obtained in March as Japan accepted the increased price. After which, Japan and Australia agreed to raise the price by 2.90 dollars and an increase over last year. Producing countries also requested a wide price rise as 7.50 dollars for general coal, making in this area very difficult to progress. Finally, they agreed to raise the price by 6.30 dollars and the electric power utility in Japan responded by importing of U.S. coal, which has a lower heat output but is also cheaper. It depends on Australia for 70% of coal supply but started to diversify the source. 3 tabs.

  12. Are internet prices sticky?

    OpenAIRE

    Lünnemann, Patrick; Wintr, Ladislav

    2006-01-01

    This paper studies the behaviour of Internet prices. It compares price rigidities on the Internet and in traditional brick-and-mortar stores and provides a cross-country perspective. The data set covers a broad range of items typically sold over the Internet. It includes more than 5 million daily price quotes downloaded from price comparison web sites in France, Germany, Italy, the UK and the US. The following results emerge from our analysis. First, and contrary to the recent findings for co...

  13. Regulation of Pharmaceutical Prices

    DEFF Research Database (Denmark)

    Kaiser, Ulrich; Méndez, Susan J.; Rønde, Thomas

    2014-01-01

    Reference prices constitute a main determinant of patient health care reimbursement in many countries. We study the effects of a change from an "external" (based on a basket of prices in other countries) to an "internal" (based on comparable domestic products) reference price system. We find...... that while our estimated consumer compensating variation is small, the reform led to substantial reductions in list and reference prices as well as co-payments, and to sizeable decreases in overall producer revenues, health care expenditures, and co-payments. These effects differ markedly between branded...

  14. Regulation of Pharmaceutical Prices

    DEFF Research Database (Denmark)

    Kaiser, Ulrich; Méndez, Susan J.; Rønde, Thomas

    Reference prices constitute a main determinant of patient health care reimbursement in many countries. We study the effects of a change from an "external" (based on a basket of prices in other countries) to an "internal" (based on comparable domestic products) reference price system. We find...... that while our estimated consumer compensating variation is small, the reform led to substantial reductions in list and reference prices as well as co-payments, and to sizeable decreases in overall producer revenues, health care expenditures, and co-payments. These effects differ markedly between branded...

  15. Alternative pricing methodologies

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    With the increased interest in competitive market forces and growing recognition of the deficiencies in current practices, FERC and others are exploring alternatives to embedded cost pricing. A number of these alternatives are discussed in this chapter. Marketplace pricing, discussed briefly here, is the subject of the next chapter. Obviously, the pricing formula may combine several of these methodologies. One utility of which the authors are aware is seeking a price equal to the sum of embedded costs, opportunity costs, line losses, value of service, FERC's percentage adder formula and a contract service charge

  16. Affordable HIV drug-resistance testing for monitoring of antiretroviral therapy in sub-Saharan Africa.

    Science.gov (United States)

    Inzaule, Seth C; Ondoa, Pascale; Peter, Trevor; Mugyenyi, Peter N; Stevens, Wendy S; de Wit, Tobias F Rinke; Hamers, Raph L

    2016-11-01

    Increased provision of antiretroviral therapy in sub-Saharan Africa has led to a growing number of patients with therapy failure and acquired drug-resistant HIV, driving the demand for more costly further lines of antiretroviral therapy. In conjunction with accelerated access to viral load monitoring, feasible and affordable technologies to detect drug-resistant HIV could help maximise the durability and rational use of available drug regimens. Potential low-cost technologies include in-house Sanger and next-generation sequencing in centralised laboratories, and point mutation assays and genotype-free systems that predict response to antiretroviral therapy at point-of-care. Strengthening of centralised high-throughput laboratories, including efficient systems for sample referral and results delivery, will increase economies-of-scale while reducing costs. Access barriers can be mitigated by standardisation of in-house assays into commercial kits, use of polyvalent instruments, and adopting price-reducing strategies. A stepwise rollout approach should improve feasibility, prioritising WHO-recommended population-based surveillance and management of complex patient categories, such as patients failing protease inhibitor-based antiretroviral therapy. Implementation research, adaptations of existing WHO guidance, and political commitment, will be key to support the appropriate investments and policy changes. In this Personal View, we discuss the potential role of HIV drug resistance testing for population-based surveillance and individual patient management in sub-Saharan Africa. We review the strengths and challenges of promising low-cost technologies and how they can be implemented. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Determinants of contractor pricing strategy

    OpenAIRE

    Moses, O. Douglas

    1988-01-01

    This paper investigates pricing strategies used by major defense contractors. Two pricing strategies are identified and discussed: penetration, which calls for a relatively low initial price followed by little reduction in price over time, and skimming, which calls for a relatively high initial price coupled with greater reduction in price over time. It is argued that contractor pricing strategy will depend on features of the defense program under consideration and featur...

  18. Customizing Prices in Online Markets

    OpenAIRE

    Werner Reinartz

    2002-01-01

    Dynamic pricing is the dynamic adjustment of prices to consumers depending on the value these customers attribute to a good. Underlying the concept of dynamic pricing is what marketers call price customization. Price customization is the charging of different prices to end consumers based on a discriminatory variable. Internet technology will serve as a great enabling tool for making dynamic pricing accessible to many industries.

  19. A Procurement Performance Model for Construction Frameworks

    Directory of Open Access Journals (Sweden)

    Terence Y M Lam

    2015-07-01

    Full Text Available Collaborative construction frameworks have been developed in the United Kingdom (UK to create longer term relationships between clients and suppliers in order to improve project outcomes. Research undertaken into highways maintenance set within a major county council has confirmed that such collaborative procurement methods can improve time, cost and quality of construction projects. Building upon this and examining the same single case, this research aims to develop a performance model through identification of performance drivers in the whole project delivery process including pre and post contract phases. A priori performance model based on operational and sociological constructs was proposed and then checked by a pilot study. Factor analysis and central tendency statistics from the questionnaires as well as content analysis from the interview transcripts were conducted. It was confirmed that long term relationships, financial and non-financial incentives and stronger communication are the sociological behaviour factors driving performance. The interviews also established that key performance indicators (KPIs can be used as an operational measure to improve performance. With the posteriori performance model, client project managers can effectively collaboratively manage contractor performance through procurement measures including use of longer term and KPIs for the contract so that the expected project outcomes can be achieved. The findings also make significant contribution to construction framework procurement theory by identifying the interrelated sociological and operational performance drivers. This study is set predominantly in the field of highways civil engineering. It is suggested that building based projects or other projects that share characteristics are grouped together and used for further research of the phenomena discovered.

  20. Postmortem sperm procurement: a legal perspective.

    Science.gov (United States)

    Kahan, S E; Seftel, A D; Resnick, M I

    1999-06-01

    Postmortem sperm procurement with subsequent artificial insemination has become a technically feasible method for posthumous conception. A variety of legal questions exist involving the rights and relationships of the deceased, his family and his issue. We addressed these questions and designed a workable protocol for postmortem sperm procurement. MEDLINE, WESTLAW and LEXIS medical literature, and case law searches were conducted. United States and international case law, United States (federal and state) statutes, Uniform Law Commissions Acts, and law review commentaries and articles were reviewed. While postmortem sperm procurement is being requested throughout the United States, no standard protocol or procedural guidelines have been established by federal or state statute. Furthermore, the courts have not yet addressed this specific scenario in reported case law. Statutes and case law do address related factual scenarios and issues, including property rights in human bodies, rules governing transplantation of human organs/body parts, rights of parties in in vivo sperm bank donations and responsibilities of parents to the conceptus of artificial insemination. A workable protocol can be established by analyzing case law and statutes addressing factually similar scenarios. Urologists must focus on the express intent of the decedent and limit any postmortem sperm retrieval to the specific requests made by the decedent. Decedent requests should be documented in writing. The decedent must be competent and of majority age. In the absence of decedent expressed affirmative directive calling for sperm retrieval, no other relative or guardian may authorize this retrieval. Issues regarding the legitimacy and inheritance rights of the conceptus will most consistently be addressed when explicitly provided for in the will of the decedent.

  1. Green Component Procurement Collaboration for Improving Supply Chain Management in the High Technology Industries: A Case Study from the Systems Perspective

    Directory of Open Access Journals (Sweden)

    Min-Ren Yan

    2016-01-01

    Full Text Available The impacts of high technology industries have been growing increasingly to technological innovations and global economic developments, while the concerns in sustainability are calling for facilitating green materials and cleaner production in the industrial value chains. Today’s manufacturing companies are not striving for individual capacities but for the effective working with green supply chains. However, in addition to environmental and social objectives, cost and economic feasibility has become one of the most critical success factors for improving supply chain management with green component procurement collaboration, especially for the electronics OEM (original equipment manufacturing companies whose procurement costs often make up a very high proportion of final product prices. This paper presents a case study from the systems perspective by using System Dynamics simulation analysis and statistical validations with empirical data. Empirical data were collected from Taiwanese manufacturing chains—among the world’s largest manufacturing clusters of high technology components and products—and their global green suppliers to examine the benefits of green component procurement collaborations in terms of shared costs and improved shipping time performance. Two different supply chain collaboration models, from multi-layer ceramic capacitor (MLCC and universal serial bus 3.0 (USB 3.0 cable procurements, were benchmarked and statistically validated. The results suggest that the practices of collaborative planning for procurement quantity and accurate fulfillment by suppliers are significantly related to cost effectiveness and shipping time efficiency. Although the price negotiation of upstream raw materials for the collaborative suppliers has no statistically significant benefit to the shipping time efficiency, the shared cost reduction of component procurement is significantly positive for supply chain collaboration among green

  2. EXAMINATION OF ETHICAL PROCUREMENT THROUGH ENTERPRISE EXAMPLES

    Directory of Open Access Journals (Sweden)

    Beáta Sz. G. Pató

    2016-06-01

    Full Text Available Today’s business world is affected by the 21st century’s processes, like globalization, fluent online attendance, digitalization and their direct consequence depersonalisation. The authors are motivated by these facts and want to vivify the „old fashioned” correct business models and find the indispensable parameter of the well-functioning economy, in one word today’s equivalent of „honorable gentlemen”. The assumed key to success could be useful for the for-profit sector because not only profit can be the impelling in the professional life of a corporation. The human value added is one of the most important keystones of thrift. The aim to establish a balance between economic and ethical behaviour of corporations has been enounced serving the interest of all participants, consumers, corporations and society. The before natural thought values seem nowadays to turn into something different or to be neglected. As a consequence the question has been raised, if society has the force to establish and improve Ethics, will it be able to destroy it as well?! The main focus of the research is therefore the mapping of criteria and marks which belong to on the competitive market successful enterprises whose procurement decisions are ethical as well. These marks can be formal or informal. The results of the research show well that there are parameters of a company, for example, a code of conduct within guidelines concerning the procurement or procedure manuals in which also ethical issues appear in a formal way. From another point of view there are informal signs like customs arising from the corporate culture, daily routine or just human behaviour and convincement of the management and procurement employees that also support the ethical performance of the company. The results of the research can serve as best practice for the other enterprises too in their daily appearance on the market. Particularly in that area the company’s most important

  3. The New EU Public Procurement Directives

    DEFF Research Database (Denmark)

    , transparency requirements, competitive dialogue, framework agreements, use of social and environmental criteria, Partnering and Public Private Partnerships and concessions. This book contains contributions based on presentations given by a number of the international and Danish speakers at the conference.......31 March 2004 the EU adopted two new public procurement directives: one for the public sector (2004/18/EC) and one for utilities (2004/17/EC). The new directives aim at simplification and modernisation of the previously existing directives including adaptation to electronic purchasing techniques...

  4. Debating Organ Procurement Policy Without Illusions.

    Science.gov (United States)

    Hippen, Benjamin

    2015-10-01

    In this perspective, I review and critique claims that the transplant waiting list overstates the demand for kidneys and correct a few mischaracterizations of some structural barriers to increasing rates of transplantation. The solutions to the shortage of organs proffered by opponents of financial incentives fail to account for a panoply of clinical, regulatory, and financial realities of transplantation centers in the United States in ways that undermine the thesis that a trial of financial incentives for organ procurement is not warranted at this time. I conclude with some personal pessimistic reflections on the progress of this debate. Copyright © 2015 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  5. Stopping Illicit Procurement: Lessons from Global Finance

    Energy Technology Data Exchange (ETDEWEB)

    Hund, Gretchen; Kurzrok, Andrew J.

    2014-06-19

    Government regulators and the financial sector cooperate to combat money laundering and terrorist financing. This information-sharing relationship is built upon a strong legislative foundation and effective operational procedures. As with money-laundering and terrorist financing, halting the illicit procurement of dual-use commodities requires close coordination between government and industry. However, many of the legal and operational features present in financial threat cooperation do not exist in the export control realm. This article analyzes the applicability of financial industry cooperative measures to nonproliferation.

  6. Relating price strategies and price-setting practices

    NARCIS (Netherlands)

    Ingenbleek, P.T.M.; Lans, van der I.A.

    2013-01-01

    Purpose - This article addresses the relationship between price strategies and price-setting practices. The first derive from a normative tradition in the pricing literature and the latter from a descriptive tradition. Price strategies are visible in the market, whereas price-setting practices are

  7. Study on Comparison of Bidding and Pricing Behavior Distinction between Estimate Methods

    Science.gov (United States)

    Morimoto, Emi; Namerikawa, Susumu

    The most characteristic trend on bidding and pricing behavior distinction in recent years is the increasing number of bidders just above the criteria for low-price bidding investigations. The contractor's markup is the difference between the bidding price and the execution price. Therefore, the contractor's markup is the difference between criteria for low-price bidding investigations price and the execution price in the public works bid in Japan. Virtually, bidder's strategies and behavior have been controlled by public engineer's budgets. Estimation and bid are inseparably linked in the Japanese public works procurement system. The trial of the unit price-type estimation method begins in 2004. On another front, accumulated estimation method is one of the general methods in public works. So, there are two types of standard estimation methods in Japan. In this study, we did a statistical analysis on the bid information of civil engineering works for the Ministry of Land, Infrastructure, and Transportation in 2008. It presents several issues that bidding and pricing behavior is related to an estimation method (several estimation methods) for public works bid in Japan. The two types of standard estimation methods produce different results that number of bidders (decide on bid-no bid strategy) and distribution of bid price (decide on mark-up strategy).The comparison on the distribution of bid prices showed that the percentage of the bid concentrated on the criteria for low-price bidding investigations have had a tendency to get higher in the large-sized public works by the unit price-type estimation method, comparing with the accumulated estimation method. On one hand, the number of bidders who bids for public works estimated unit-price tends to increase significantly Public works estimated unit-price is likely to have been one of the factors for the construction companies to decide if they participate in the biddings.

  8. Intranational Price Convergence and Price Stickiness

    DEFF Research Database (Denmark)

    Bergman, Ulf Michael; Heebøll, Christian; Hansen, Niels Lynggaard

    2017-01-01

    We show that estimates of the half-life of deviations from LOOP are biased when not taking into account the precision when aggregating over types of goods. Using a comprehensive dataset with monthly price data for 124 homogeneous products across regions in Denmark over the period 1997–2010 we find...... a large positive aggregation bias. On average, we find that the half-life is 8.4 months when taking the bias into account compared to 28.7 months when applying the standard method. The heterogeneity in estimated half-life can be explained by price stickiness, distance between regions and whether the good...

  9. Stochastic energy procurement of large electricity consumer considering photovoltaic, wind-turbine, micro-turbines, energy storage system in the presence of demand response program

    International Nuclear Information System (INIS)

    Nojavan, Sayyad; Aalami, Habib allah

    2015-01-01

    Highlights: • A stochastic energy procurement cost function in presence of DRP is proposed. • The load, price and output power of PV and wind uncertainties are modeled. • Four case studies are used to assess the effects of ESS and DRP on SEPP. • Case 4 is considered the effects of ESS and DRP simultaneously. • The expected energy procurement cost of case 4 is lower than cases 1, 2 and 3. - Abstract: This paper proposes a stochastic energy procurement problem (SEPP) for large electricity consumer (LEC) with multiple energy procurement sources (EPSs) considering the effects of demand response program (DRP) and energy storage system (ESS). The EPSs contain power market (PM), bilateral contracts (BCs), micro-turbines (MTs), and renewable energy sources (RESs). Moreover, the RESs include photovoltaic (PV) systems and wind-turbines (WT). The ESS and DRP are incorporated in the SEPP by the LEC’s decision-maker to reduce the expected energy procurement cost (EEPC). Meanwhile, the uncertainty models of market price, load and RES output power are considered in the SEPP formulation. The error of forecasting of market price, load, temperature and radiation of PV systems are modeled using the normal distribution for generating the related scenarios. Also, the weibull distribution is used to generate variable wind speed scenarios for WT output power uncertainty modeling. Furthermore, the fast forward selection based on Kantorovich distance approach is used for the scenarios reduction. Finally, the influences of ESS and DRP on EEPC are investigated, and four case studies are used to illustrate the capability of the proposed SEPP. The obtained results demonstrate the efficiency of the proposed stochastic program

  10. Prices and availability of locally produced and imported medicines in Ethiopia and Tanzania.

    Science.gov (United States)

    Ewen, M; Kaplan, W; Gedif, T; Justin-Temu, M; Vialle-Valentin, C; Mirza, Z; Regeer, B; Zweekhorst, M; Laing, R

    2017-01-01

    To assess the effect of policies supporting local medicine production to improve access to medicines. We adapted the WHO/HAI instruments measuring medicines availability and prices to differentiate local from imported products, then pilot tested in Ethiopia and Tanzania. In each outlet, prices were recorded for all products in stock for medicines on a country-specific list. Government procurement prices were also collected. Prices were compared to an international reference and expressed as median price ratios (MPR). The Ethiopian government paid more for local products (median MPR = 1.20) than for imports (median MPR = 0.84). Eight of nine medicines procured as both local and imported products were cheaper when imported. Availability was better for local products compared to imports, in the public (48% vs. 19%, respectively) and private (54% vs. 35%, respectively) sectors. Patient prices were lower for imports in the public sector (median MPR = 1.18[imported] vs. 1.44[local]) and higher in the private sector (median MPR = 5.42[imported] vs. 1.85[local]). In the public sector, patients paid 17% and 53% more than the government procurement price for local and imported products, respectively. The Tanzanian government paid less for local products (median MPR = 0.69) than imports (median MPR = 1.34). In the public sector, availability of local and imported products was 21% and 32% respectively, with patients paying slightly more for local products (median MPR = 1.35[imported] vs. 1.44[local]). In the private sector, local products were less available (21%) than imports (70%) but prices were similar (median MPR = 2.29[imported] vs. 2.27[local]). In the public sector, patients paid 135% and 65% more than the government procurement price for local and imported products, respectively. Our results show how local production can affect availability and prices, and how it can be influenced by preferential purchasing and mark-ups in the public

  11. The World Bank Group and Public Procurement--An Independent Evaluation : Volume 2: Achieving Development Effectiveness through Procurement in Bank Financial Assistance

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  12. The European Union Joint Procurement Agreement for cross-border health threats: what is the potential for this new mechanism of health system collaboration?

    Science.gov (United States)

    Azzopardi-Muscat, Natasha; Schroder-Bäck, Peter; Brand, Helmut

    2017-01-01

    The Joint Procurement Agreement (JPA) is an innovative instrument for multi-country procurement of medical countermeasures against cross-border health threats. This paper aims to assess its potential performance. A literature review was conducted to identify key features of successful joint procurement programmes. Documentary analysis and a key informants' interview were carried out to analyse the European Union (EU) JPA. Ownership, equity, transparency, stable central financing, standardisation, flexibility and gradual development were identified as important prerequisites for successful establishment of multi-country joint procurement programmes in the literature while security of supply, favourable prices, reduction of operational costs and administrative burden and creation of professional expert networks were identified as desirable outcomes. The EU JPA appears to fulfil the criteria of ownership, transparency, equity, flexibility and gradual development. Standardisation is only partly fulfilled and central EU level financing is not provided. Security of supply is an important outcome for all EU Member States (MS). Price savings, reduction in administrative burden and creation of professional networks may be particularly attractive for the smaller MS. The JPA has the potential to increase health system collaboration and efficiency at EU level provided that the incentives for sustained commitment of larger MS are sufficiently attractive.

  13. Price learning during grocery shopping

    DEFF Research Database (Denmark)

    Jensen, Birger Boutrup

    Many attempts have been made to measure consumers' price knowledge for groceries. However, the results have varied considerably and conflict with results of reference price research. This is the first study to examine price knowledge before, during, and after store visit, thus enabling a study...... of what consumers learn about prices during grocery shopping. Three measures of price knowledge corresponding to different levels of price information processing were applied. Results indicate that price learning does take place and that episodic price knowledge after store exit is far more widespread...... than expected. Consequently, a new view of how consumer price knowledge evolves during grocery shopping is presented....

  14. Assessing Asset Pricing Anomalies

    NARCIS (Netherlands)

    W.A. de Groot (Wilma)

    2017-01-01

    markdownabstractOne of the most important challenges in the field of asset pricing is to understand anomalies: empirical patterns in asset returns that cannot be explained by standard asset pricing models. Currently, there is no consensus in the academic literature on the underlying causes of

  15. Poverty and price transmission

    DEFF Research Database (Denmark)

    Elleby, Christian

    A key parameter determining the welfare impact from a world market shock is the transmission elasticity which measures the average domestic response to an international price change. Many studies have estimated price transmission elasticities for a large number of countries but the variation in t...

  16. Essays on asset pricing

    NARCIS (Netherlands)

    Nazliben, Kamil

    2015-01-01

    The dissertation consists of three chapters that represent separate papers in the area of asset pricing. The first chapter studies investors optimal asset allocation problem in which mean reversion in stock prices is captured by explicitly modeling transitory and permanent shocks. The second chapter

  17. Pricing transmission services

    International Nuclear Information System (INIS)

    Haaden, E.

    1995-01-01

    The price structure for transmission of electric power through the main lines in Sweden is analyzed. After deregulation of the electricity market, the main transmission lines are owned by a separate national company, with no interests from the power producers. Comparisons are made to ideal marginal price structures. 6 refs

  18. Selecting Lower Priced Items.

    Science.gov (United States)

    Kleinert, Harold L.; And Others

    1988-01-01

    A program used to teach moderately to severely mentally handicapped students to select the lower priced items in actual shopping activities is described. Through a five-phase process, students are taught to compare prices themselves as well as take into consideration variations in the sizes of containers and varying product weights. (VW)

  19. Petroleum: Price trends

    International Nuclear Information System (INIS)

    Babusiaux, Denis; Pierru, Axel

    2010-01-01

    The Organization of Petroleum-Exporting Countries (OPEC), some political leaders and financiers have mainly attributed the price spike of oil in 2008 - followed by a just as spectacular drop in prices - to the speculative moves made by financial investors on the futures market instead of to market fundamentals

  20. Pricing Mechanism in Information Goods

    OpenAIRE

    Li, Xinming; Wang, Huaqing

    2018-01-01

    We study three pricing mechanisms' performance and their effects on the participants in the data industry from the data supply chain perspective. A win-win pricing strategy for the players in the data supply chain is proposed. We obtain analytical solutions in each pricing mechanism, including the decentralized and centralized pricing, Nash Bargaining pricing, and revenue sharing mechanism.