WorldWideScience

Sample records for antiretroviral procurement prices

  1. Compulsory licensing often did not produce lower prices for antiretrovirals compared to international procurement.

    Science.gov (United States)

    Beall, Reed F; Kuhn, Randall; Attaran, Amir

    2015-03-01

    Compulsory licensing has been widely suggested as a legal mechanism for bypassing patents to introduce lower-cost generic antiretrovirals for HIV/AIDS in developing countries. Previous studies found that compulsory licensing can reduce procurement prices for drugs, but it is unknown how the resulting prices compare to procurements through the Global Fund to Fight AIDS, Tuberculosis, and Malaria; UNICEF; and other international channels. For this study we systematically constructed a case-study database of compulsory licensing activity for antiretrovirals and compared compulsory license prices to those in the World Health Organization's (WHO's) Global Price Reporting Mechanism and the Global Fund's Price and Quality Reporting Tool. Thirty compulsory license cases were analyzed with 673 comparable procurements from WHO and Global Fund data. Compulsory license prices exceeded the median international procurement prices in nineteen of the thirty case studies, often with a price gap of more than 25 percent. Compulsory licensing often delivered suboptimal value when compared to the alternative of international procurement, especially when used by low-income countries to manufacture medicines locally. There is an ongoing need for multilateral and charitable actors to work collectively with governments and medicine suppliers on policy options. Project HOPE—The People-to-People Health Foundation, Inc.

  2. Can voluntary pooled procurement reduce the price of antiretroviral drugs? a case study of Efavirenz.

    Science.gov (United States)

    Kim, Sung Wook; Skordis-Worrall, Jolene

    2017-05-01

    : A number of strategies have aimed to assist countries in procuring antiretroviral therapy (ARV) at lower prices. In 2009, as the Global Fund to Fight AIDS, Tuberculosis and Malaria (GFATM) commenced a voluntary pooled procurement scheme, however, the impact of the scheme on ARV prices remains uncertain. This study aims to estimate the effect of VPP on drug prices using Efavirenz as a case study. This analysis uses WHO Global price report mechanism (GPRM) data from 2004 to 2013. Due to the highly skewed distribution of drug Prices, a generalized linear model (GLM) was used to conduct a difference-in-difference estimation of drug price changes over time. These analyses found that voluntary pooled procurement reduced both the ex-works price of generic Efavirenz and the incoterms price by 16.2 and 19.1%, respectively ( P <  0.001) in both cases). The year dummies were also statistically significant from 2006 to 2013 ( P <  0.001), indicating a strong decreasing trend in the price of Efavirenz over that period. Voluntary pooled procurement significantly reduced the price of 600 mg generic Efavirenz between 2009 and 2013. Voluntary pooled procurement therefore offers a potentially effective strategy for the reduction in HIV drug prices and the improvement of technical efficiency in HIV programming. Further work is required to establish if these findings hold also for other drugs. © The Author 2017. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com

  3. Price competition in procurement

    International Nuclear Information System (INIS)

    Keisler, J.M.; Buehring, W.A.

    1996-07-01

    When creating a private market to provide a public good, government agencies can influence the market's competitive characteristics. Markets have predictable, but often counterintuitive, behaviors. To succeed in applying available controls, and thereby reduce future costs, agencies must understand the behavior of the market. A model has been constructed to examine some issues in establishing competition for a structure in which there are economies of scale and government is obligated to purchase a fixed total quantity of a good. This model is used to demonstrate a way to estimate the cost savings from several alternative plans for a buyer exploring competitive procurement. The results are not and cannot be accurate for budgeting purposes; rather, they indicate the approximate magnitude of changes in cost that would be associated with changes in the market structure within which procurement occurs

  4. Antiretroviral procurement and supply chain management.

    Science.gov (United States)

    Ripin, David J; Jamieson, David; Meyers, Amy; Warty, Umesh; Dain, Mary; Khamsi, Cyril

    2014-01-01

    Procurement, the country-level process of ordering antiretrovirals (ARVs), and supply chain management, the mechanism by which they are delivered to health-care facilities, are critical processes required to move ARVs from manufacturers to patients. To provide a glimpse into the ARV procurement and supply chain, the following pages provide an overview of the primary stakeholders, principal operating models, and policies and regulations involved in ARV procurement. Also presented are key challenges that need to be addressed to ensure that the supply chain is not a barrier to the goal of universal coverage. This article will cover the steps necessary to order and distribute ARVs, including different models of delivery, key stakeholders involved, strategic considerations that vary depending on context and policies affecting them. The single drug examples given illustrate the complications inherent in fragmented supply and demand-driven models of procurement and supply chain management, and suggest tools for navigating these hurdles that will ultimately result in more secure and reliable ARV provision. Understanding the dynamics of ARV supply chain is important for the global health community, both to ensure full and efficient treatment of persons living with HIV as well as to inform the supply chain decisions for other public health products.

  5. Global strategies to reduce the price of antiretroviral medicines: evidence from transactional databases.

    Science.gov (United States)

    Waning, Brenda; Kaplan, Warren; King, Alexis C; Lawrence, Danielle A; Leufkens, Hubert G; Fox, Matthew P

    2009-07-01

    To estimate the impact of global strategies, such as pooled procurement arrangements, third-party price negotiation and differential pricing, on reducing the price of antiretrovirals (ARVs), which currently hinders universal access to HIV/AIDS treatment. We estimated the impact of global strategies to reduce ARV prices using data on 7253 procurement transactions (July 2002-October 2007) from databases hosted by WHO and the Global Fund to Fight AIDS, Tuberculosis and Malaria. For 19 of 24 ARV dosage forms, we detected no association between price and volume purchased. For the other five ARVs, high-volume purchases were 4-21% less expensive than medium- or low-volume purchases. Nine of 13 generic ARVs were priced 6-36% lower when purchased under the Clinton Foundation HIV/AIDS Initiative (CHAI). Fifteen of 18 branded ARVs were priced 23-498% higher for differentially priced purchases compared with non-CHAI generic purchases. However, two branded, differentially priced ARVs were priced 63% and 73% lower, respectively, than generic non-CHAI equivalents. Large purchase volumes did not necessarily result in lower ARV prices. Although current plans for pooled procurement will further increase purchase volumes, savings are uncertain and should be balanced against programmatic costs. Third-party negotiation by CHAI resulted in lower generic ARV prices. Generics were less expensive than differentially priced branded ARVs, except where little generic competition exists. Alternative strategies for reducing ARV prices, such as streamlining financial management systems, improving demand forecasting and removing barriers to generics, should be explored.

  6. An analysis of volumes, prices and pricing trends of the pediatric antiretroviral market in developing countries from 2004 to 2012.

    Science.gov (United States)

    Lee, Janice Soo Fern; Sagaon Teyssier, Luis; Dongmo Nguimfack, Boniface; Collins, Intira Jeannie; Lallemant, Marc; Perriens, Joseph; Moatti, Jean-Paul

    2016-03-15

    The pediatric antiretroviral (ARV) market is poorly described in the literature, resulting in gaps in understanding treatment access. We analyzed the pediatric ARV market from 2004 to 2012 and assessed pricing trends and associated factors. Data on donor funded procurements of pediatric ARV formulations reported to the Global Price Reporting Mechanism database from 2004 to 2012 were analyzed. Outcomes of interest were the volume and mean price per patient-year ARV formulation based on WHO ARV dosing recommendations for a 10 kg child. Factors associated with the price of formulations were assessed using linear regression; potential predictors included: country income classification, geographical region, market segment (originator versus generic ARVs), and number of manufacturers per formulation. All analyses were adjusted for type of formulations (single, dual or triple fixed-dose combinations (FDCs)) Data from 111 countries from 2004 to 2012 were included, with procurement of 33 formulations at a total value of USD 204 million. Use of dual and triple FDC formulations increased substantially over time, but with limited changes in price. Upon multivariate analysis, prices of originator formulations were found to be on average 72 % higher than generics (p market as represented by the GPRM database is small, and lacks price competition. It is dominated by generic drugs due to the lower prices offered and the practicality of FDC formulations. This market requires continued donor support and the current initiatives to protect it are important to ensure market viability, especially if new formulations are to be introduced in the future.

  7. Price dependent procurement decisions in one-period inventory problem

    OpenAIRE

    Polatoğlu, Hakan

    1989-01-01

    Ankara : The Department of Industrial Engineering and the Institute of Engineering and Sciences of Bilkent Univ., 1989. Thesis (Master's) -- Bilkent University, 1989. Includes bibliographical references leaves 40-41. In this work the classical newsboy model is extended by introducing a price dependent demand pattern. It is intended to obtain optimal procurement and pricing decisions for maximizing the expected profit. It is shown that, both decisions can be made simultaneously ...

  8. Procurement Prices Paid for Aircraft Weapons Systems for Foreign Military Sales

    National Research Council Canada - National Science Library

    Hendricks, Nancy

    1993-01-01

    The objective of the audit was to determine whether the prices paid to DoD contractors for aircraft weapons systems procured for FMS customers were reasonable, compared to the prices DoD paid for similar items...

  9. Cost and price auditing: effectiveness in the procurement of defense services in Spain

    OpenAIRE

    Romero,José Aguado; Hernández,Antonio M. López

    2016-01-01

    Abstract Contract auditing, or cost and price auditing, has been applied in Spain as a means of determining prices in non-competitive defense contracts since 1989. Factors such as Spain's participation in international defense organizations, the characteristics of the defense market and the contractual legal framework for the procurement of defense goods and services help underscore the need for the Spanish Ministry of Defense to implement cost and price auditing. With the evolution of cost a...

  10. Soaring antiretroviral prices, TRIPS and TRIPS flexibilities: a burning issue for antiretroviral treatment scale-up in developing countries.

    Science.gov (United States)

    Orsi, Fabienne; d'almeida, Cristina

    2010-05-01

    The achievement of significant reductions in the price of antiretroviral drugs constitutes one of the main economic pillars of antiretroviral treatment scale-up in developing countries. Today this economic pillar is threatened. The prohibitive prices of newer first-line and second-line regimens have created a watershed in relation to the prices of earlier first-line treatments. These price increases are closely related to the World Trade Organization's Agreement on the trade-related aspects of intellectual property rights (TRIPS) that imposes an important barrier to generic competition. Intellectual property flexibilities foreseen by the TRIPS agreement allow the manufacture and supply of affordable generic versions of new generations of antiretroviral under certain conditions. However, the capacity to supply a specified list of generics under such conditions is tight and the utilization of such flexibilities in their current form remains complex and unattractive. The TRIPS agreement currently constitutes a significant barrier to providing access to new antiretroviral at affordable prices in developing countries. If the debate on initiatives for increased flexibility of intellectual property rights does not become more extensive or obtain the overwhelming support of the international community, serious consequences are to be expected in terms of the fight against AIDS in most of the developing countries.

  11. PHARMACEUTICAL PRICING IN EMERGING MARKETS: EFFECTS OF INCOME, COMPETITION, AND PROCUREMENT

    Science.gov (United States)

    Danzon, Patricia M; Mulcahy, Andrew W; Towse, Adrian K

    2015-01-01

    This paper analyzes determinants of ex-manufacturer prices for originator and generic drugs across countries. We focus on drugs to treat HIV/AIDS, TB, and malaria in middle and low-income countries (MLICs), with robustness checks to other therapeutic categories and the full income range of countries. We examine the effects of per capita income, income dispersion, competition from originator and generic substitutes, and whether the drugs are sold to retail pharmacies versus tendered procurement by non-government organizations. The cross-national income elasticity of prices is 0.27 across the full income range of countries but is 0.0–0.10 between MLICs, implying that drugs are least affordable relative to income in the lowest income countries. Within-country income inequality contributes to relatively high prices in MLICs. Although generics are priced roughly 30% lower than originators on average, the variance is large. Additional generic competitors only weakly affect prices, plausibly because generic quality uncertainty leads to competition on brand rather than price. Tendered procurement that imposes quality standards attracts multinational generic suppliers and significantly reduces prices of originator and generic drugs, compared with their respective prices to retail pharmacies. ©2013 The Authors. Health Economics Published by John Wiley & Sons Ltd. PMID:24293058

  12. Cost and price auditing: effectiveness in the procurement of defense services in Spain

    Directory of Open Access Journals (Sweden)

    José Aguado Romero

    Full Text Available Abstract Contract auditing, or cost and price auditing, has been applied in Spain as a means of determining prices in non-competitive defense contracts since 1989. Factors such as Spain's participation in international defense organizations, the characteristics of the defense market and the contractual legal framework for the procurement of defense goods and services help underscore the need for the Spanish Ministry of Defense to implement cost and price auditing. With the evolution of cost and price auditing in Spain in mind, this paper analyses the entire process, describes the audit procedures that are most commonly used today and assesses the main results achieved, in terms of financial savings. The results obtained show that cost and price auditing does indeed contribute to a more efficient use of public resources.

  13. Mathematical Modelling of the Price Range in the Procurement of Ferrous Scrap by Metallurgical Enterprises

    Directory of Open Access Journals (Sweden)

    Tatyana Aleksandrovna Ivanova

    2018-03-01

    Full Text Available For metallurgical enterprises, it is important to understand the limits of the most probable values of prices and geographical area for procurement of ferrous scrap in the regions. In order to define the maximal scrap prices in the regions, the authors have developed a mathematical model of “auction purchases”. This model equally assesses price competition between scrap consumers. When setting the price, we consider the territorial imbalances between scrap supply and demand in the regions; costs for scrap transportation from supplier to consumer; price level for scrap in the “windows for exports”. We calculate the lowest price according to the “export parity”. The results of the calculations allow evaluating a range of regional prices and interregional flows of scrap. This approach is unnown in the published works of Russian and foreign researchers. For calculations, we have developed a special software. The following initial data were used: data on railroad transportation of ferrous scrap in the Russian Federation provided by JSC Russian Railways; handbooks of railway tariffs 10–01 between railway stations of the Russian Federation; statistical data on prices of 3A metal scrap in the “windows for exports”. The article presents the formal structure of the model of “auction procurement”, the algorithm of its implementation and the results of calculations. The price level calculated according to the model of “auction procurement” can be used in management practice as potentially highest level of price, which can be reached in the conditions of competition between consumers of scrap in a situation when the negotiations are impossible. The proposed mathematical model allows a metallurgical enterprise to prove and implement a differentiated approach to the formation of regional prices of scrap, and to define regions for scrap purchasing.

  14. Optimal selling price and energy procurement strategies for a retailer in an electricity market

    International Nuclear Information System (INIS)

    Hatami, A.R.; Seifi, H.; Sheikh-El-Eslami, M.K.

    2009-01-01

    In an electricity market, the retailer sets up contracts with the wholesale side for purchasing electricity and with the customers for its selling. This paper proposes a mathematical method based on mixed-integer stochastic programming to determine the optimal sale price of electricity to customers and the electricity procurement policy of a retailer for a specified period. The retailer has multiple choices for electricity procurement, such as spot market, forward contracts, call options and self-production. Risk is considered and modeled by conditional value-at-risk methodology. Also, the competition between retailers is modeled using a market share function. A case study is illustrated to demonstrate the capability of the proposed method. (author)

  15. Do national drug policies influence antiretroviral drug prices? Evidence from the Southern African Development community.

    Science.gov (United States)

    Liu, Yao; Galárraga, Omar

    2017-03-01

    The efficacy of low- and middle-income countries’ (LMIC) national drug policies in managing antiretroviral (ARV) pharmaceutical prices is not well understood. Though ARV drug prices have been declining in LMIC over the past decade, little research has been done on the role of their national drug policies. This study aims to (i) analyse global ARV prices from 2004 to 2013 and (ii) examine the relationship of national drug policies to ARV prices. Analysis of ARV drug prices utilized data from the Global Price Reporting Mechanism from the World Health Organization (WHO). Ten of the most common ARV drugs (first-line and second-line) were selected. National drug policies were also assessed for 12 countries in the South African Development Community (SADC), which self-reported their policies through WHO surveys. The best predictor of ARV drug price was generic status—the generic versions of 8 out of 10 ARV drugs were priced lower than branded versions. However, other factors such as transaction volume, HIV prevalence, national drug policies and PEPFAR/CHAI involvement were either not associated with ARV drug price or were not consistent predictors of price across different ARV drugs. In the context of emerging international trade agreements, which aim to strengthen patent protections internationally and potentially delay the sale of generic drugs in LMIC, this study shines a spotlight on the importance of generic drugs in controlling ARV prices. Further research is needed to understand the impact of national drug policies on ARV prices.

  16. Prices of second-line antiretroviral treatment for middle-income countries inside versus outside sub-Saharan Africa.

    Science.gov (United States)

    Simmons, Bryony; Hill, Andrew; Ford, Nathan; Ruxrungtham, Kiat; Ananworanich, Jintanat

    2014-01-01

    Antiretrovirals are available at low prices in sub-Saharan Africa, but these prices may not be consistently available for middle-income countries in other regions with large HIV epidemics. Over 30% of HIV infected people live in countries outside sub-Saharan Africa. Several key antiretrovirals are still on patent, with generic production restricted. We assessed price variations for key antiretroviral drugs inside versus outside sub-Saharan Africa. HIV drug prices used in national programmes (2010-2014) were extracted from the WHO Global Price Reporting Mechanism database for all reporting middle-income countries as classified by the World Bank. Treatment costs (branded and generic) were compared for countries inside sub-Saharan Africa versus those outside. Five key second-line antiretrovirals were analysed: abacavir, atazanavir, darunavir, lopinavir/ritonavir, raltegravir. Prices of branded antiretrovirals were significantly higher outside sub-Saharan Africa (psub-Saharan Africa versus $4689 (IQR $4075-5717) in non-African middle-income countries, an increase of 541%. However, when supplied by generic companies, most antiretrovirals were similarly priced between countries in sub-Saharan Africa and other regions. Pharmaceutical companies are selling antiretrovirals to non-African middle-income countries at prices 74-541% higher than African countries with similar gross national incomes. However, generic companies are selling most of these drugs at similar prices across regions. Mechanisms to ensure fair pricing for patented antiretrovirals across both African and non-African middle-income countries need to be improved, to ensure sustainable treatment access.

  17. A new entity for the negotiation of public procurement prices for patented medicines in Mexico.

    Science.gov (United States)

    Gómez-Dantés, Octavio; Wirtz, Veronika J; Reich, Michael R; Terrazas, Paulina; Ortiz, Maki

    2012-10-01

    As countries expand health insurance coverage, their expenditures on medicines increase. To address this problem, WHO has recommended that every country draw up a list of essential medicines. Although most medicines on the list are generics, in many countries patented medicines represent a substantial portion of pharmaceutical expenditure. To help control expenditure on patented medicines, in 2008 the Mexican Government created the Coordinating Commission for Negotiating the Price of Medicines and other Health Inputs (CCPNM), whose role, as the name suggests, is to enter into price negotiations with drug manufacturers for patented drugs on Mexico's list of essential medicines. Mexico's public expenditure on pharmaceuticals has increased substantially in the past decade owing to government efforts to achieve universal health-care coverage through Seguro Popular, an insurance programme introduced in 2004 that guarantees access to a comprehensive package of health services and medicines. Since 2008, the CCPNM has improved procurement practices in Mexico's public health institutions and has achieved significant price reductions resulting in substantial savings in public pharmaceutical expenditure. The CCPNM has successfully changed the landscape of price negotiation for patented medicines in Mexico. However, it is also facing challenges, including a lack of explicit indicators to assess CCPNM performance; a shortage of permanent staff with sufficient technical expertise; poor coordination among institutions in preparing background materials for the annual negotiation process in a timely manner; insufficient communication among committees and institutions; and a lack of political support to ensure the sustainability of the CCPNM.

  18. Comparative assessment of medicine procurement prices in the United Nations Relief and Works Agency for Palestine Refugees in the Near East (UNRWA).

    Science.gov (United States)

    Ewen, Margaret; Al Sakit, Maisa; Saadeh, Rawan; Laing, Richard; Vialle-Valentin, Catherine; Seita, Akihiro; Bunders, Joske

    2014-01-01

    The United Nations Relief and Works Agency for Palestine Refugees in the Near East (UNRWA), the main primary healthcare provider for 4.9 million Palestinian refugees, spent USD18.3 million on essential medicines dispensed free-of-charge through clinics in five areas of operation ('fields'): Gaza, Jordan, Lebanon, Syria, and the West Bank (2010). Faced with budget contraints and an increasing demand for medicines to treat chronic conditions, the objective of our study was to assess UNRWA's medicine procurement prices to see if savings could be possible. In July 2011, data was collected from UNRWA headquarters in Jordan. Price analyses focused on the top 80 medicines by value, accounting for 93% of pharmaceutical expenditure from the General Fund, with comparisons to international, regional and national references. Prices were also compared for the few medicines procured both through UNRWA's central tender (centrally) and by the fields directly (locally). Central procurement prices did not differ markedly from reference prices: median ratios of UNRWA prices to Management Sciences for Health's International Drug Price Indicator Guide, Jordan's Joint Procurement Department, Gulf Cooperation Council, and IDA Foundation bulk packs were 0.99, 1.00, 0.98 and 1.12 respectively. Applying the lowest comparator price to five comparatively higher priced medicines would yield savings of USD1.4 million. Local procurements were generally less cost-effective than central tender procurement, with notable differences across fields and medicines. Overall, UNRWA's procurement prices were competitive despite the relatively small quantities procured. Regular monitoring of procurement prices and quantities is needed in order to make informed decisions. Our evaluation also underscores the heavy burden of antidiabetic medicines and antimicrobials on UNRWA procurement expenditure.

  19. Reality check on Ontario electricity price procurement: a report from the trenches

    International Nuclear Information System (INIS)

    Rodger, J.M.; Wegiel, H.; Ferns, T.; Bystrin, A.

    2003-01-01

    The approaches taken to manage energy price risks from three different perspectives were presented. The first perspective presented was that of a law firm specializing in assisting a wide variety of clients constituting retailers and large industrial, institutional, and commercial users. The second perspective presented was that of Dofasco, the largest industrial electricity consumer in Ontario, followed by the perspective offered by Oakville Hydro, representing one of few municipally owned electricity retailers in Ontario. The first order of business, from the lawyer's viewpoint, is to identify relevant considerations for consumers and retailers, such as how do you intend to participate in the new market, what are the desired outcomes, the appetite for risk. The formulation of an approach should take the following into consideration: historical context versus new market reality, experience with electricity suppliers, and dilemma for consumers and retailers on how to level the playing field. The chosen approach was that of a request for proposals process for electricity price procurement. In the case of Dofasco, the introduction of the deregulated electricity market meant business risks, which it chose to address using an integrated risk management approach. Oakville Hydro explained its reasons for jumping into a trench: earn financial rewards and prevent brand equity erosion. Retail business must be kept simple through identifying, understanding and limiting the risks; and moving carefully but expeditiously. To mitigate the risks, it advocated getting the best legal and economics advice possible, looking for experienced partners, and not betting the shop.tabs., figs

  20. The role of discounts and loss leaders in medicine procurement in Austrian hospitals - a primary survey of official and actual medicine prices.

    Science.gov (United States)

    Vogler, Sabine; Zimmermann, Nina; Habl, Claudia; Mazag, Jan

    2013-07-04

    Knowledge about the prices of medicines used in hospitals, particularly the actually achieved ones, is scant. There are indications of large discounts and the provision of medicines cost-free to Austrian hospitals. The study aims to survey the official and actual prices of medicines procured by Austrian hospitals and to compare them to the out-patient prices. Primary price collection of the official hospital list prices and the actually achieved prices for 12 active ingredients as of the end of September 2009 in five general hospitals in Austria and analysis of the 15 most commonly used presentations. The official hospital list prices per unit differed considerably (from 1,500 Euro for an oncology medicine to 0.20 Euro for a generic cardiovascular medicine). For eight on-patent medicines (indications: oncology, anti-inflammatory, neurology-multiple sclerosis and blood) actual hospital medicine prices equaled the list prices (seven medicines) or were lower (one medicine) in four hospitals, whereas one hospital always reported higher actual prices due to the application of a wholesale mark-up. The actual hospital prices of seven medicines (cardiology and immunomodulation) were below the official hospital prices in all hospitals; of these all cardiovascular medicines were provided free-of-charge. Hospital prices were always lower than out-patient prices (pharmacy retail price net and reimbursement price). The results suggest little headroom for hospitals to negotiate price reductions for "monopoly products", i.e. medicines with no therapeutic alternative. Discounts and cost-free provision (loss leaders) appear to be granted for products of strategic importance for suppliers, e.g. cardiovascular medicines, whose treatment tends to be continued in primary care after discharge of the patient.

  1. Procurement with specialized firms

    DEFF Research Database (Denmark)

    Boone, Jan; Schottmüller, Christoph

    2016-01-01

    This paper analyzes optimal procurement mechanisms when firms are specialized. The procurement agency has incomplete information concerning the firms’ cost functions and values high quality as well as low price. Lower type firms are cheaper (more expensive) than higher type firms when providing l...

  2. Defense Contract Audit Agency Reviews of Price Proposals

    National Research Council Canada - National Science Library

    1998-01-01

    .... Auditors perform field pricing reviews of contractor price proposals when procurement office information is insufficient to perform the cost or price analysis needed to negotiate contract prices...

  3. Conflicts in Public Procurement

    Directory of Open Access Journals (Sweden)

    Helena Lindskog

    2013-01-01

    Full Text Available During the last couple of years, there has been a tendency to include more and more political goals into public procurements, such as environmental and societal considerations. This can result in higher prices paid by the public sector compared with similar procurements in the private sector. The decision makers at local level are elected and should represent the interest of their communities and voters, which includes promoting regional/local companies and economic development. This task can sometimes get into conflict with public procurement law or the political goals of a central government. (original abstract

  4. Trends in procurement costs for HIV commodities: a 7-year retrospective analysis of global fund data across 125 countries.

    Science.gov (United States)

    Wafula, Francis; Agweyu, Ambrose; Macintyre, Kate

    2014-04-01

    Nearly 40% of Global Fund money goes toward procurement. However, no analyses have been published to show how costs vary across regions and time, despite the availability of procurement data collected through the Global Fund's price and quality reporting system. We analyzed data for the 3 most widely procured commodities for the prevention, diagnosis, and treatment of HIV. These were male condoms, HIV rapid tests, and the antiretroviral (ARV) combination of lamivudine/nevirapine/zidovudine. The compared costs, first across time (2005-2012), then across regions, and finally, between individual procurement reported through the price and quality reporting and pooled procurement reported through the Global Fund's voluntary pooled procurement system. All costs were adjusted for inflation and reported in US dollars. There were 2337 entries from 578 grants in 125 countries. The procurement cost for the ARV dropped substantially over the period, whereas those for condoms and HIV tests remained relatively stable. None of the commodity prices increased. Regional variations were pronounced for HIV tests, but minimal for condoms and the ARV. The unit cost for the 3-table ARV combination, for instance, varied between US$0.15 and US$0.23 in South Asia and the Eastern Europe/Central Asia regions, respectively, compared with a range of $0.23 (South Asia)-$1.50 (Eastern Europe/Central Asia) for a single diagnostic test. Pooled procurement lowered costs for condoms but not the other commodities. We showed how global procurement costs vary by region and time. Such analyses should be done more often to identify and correct market insufficiencies.

  5. Public Procurement of Innovation Policy

    DEFF Research Database (Denmark)

    Rolfstam, Max; Petersen, Ole Helby

    2014-01-01

    Until recently, Danish policy interest in public procurement has mainly been driven by efficiency and cost-effectiveness concerns. Public-procurement policies have in general focused on the utilisation of economies of scale as a Means of achieving lower prices on goods and services. Attempts...

  6. Avoidable Software Procurements

    Science.gov (United States)

    2012-09-01

    2011. This memorandum expanded on the previous 2010 ban on the procurement of servers and 10 voice switching equipment to include construction...Autodesk products, at a discount of up to 10% off of the GSA price. CA Unicenter enterprise management software is available at 64% off; BPwin and Erwin

  7. Antiretroviral purchasing and prescription practices in Mexico: constraints, challenges and opportunities.

    Science.gov (United States)

    Chaumont, Claire; Bautista-Arredondo, Sergio; Calva, Juan José; Bahena-González, Roberto Isaac; Sánchez-Juárez, Gerda Hitz; González de Araujo-Muriel, Arturo; Magis-Rodríguez, Carlos; Hernández-Ávila, Mauricio

    2015-01-01

    This study examines the antiretroviral (ARV) market characteristics for drugs procured and prescribed to Mexico's Social Protection System in Health beneficiaries between 2008 and 2013, and compares them with international data. Procurement information from the National Center for the Prevention and the Control of HIV/AIDS was analyzed to estimate volumes and prices of key ARV. Annual costs were compared with data from the World Health Organization's Global Price Reporting Mechanism for similar countries. Finally, regimens reported in the ARV Drug Management, Logistics and Surveillance System database were reviewed to identify prescription trends and model ARV expenditures until 2018. Results show that the first-line ARV market is concentrated among a small number of patented treatments, in which prescription is clinically adequate, but which prices are higher than those paid by similar countries. The current set of legal and structural options available to policy makers to bring prices down is extremely limited. Different negotiation policies were not successful to decrease ARV high prices in the public health market. The closed list approach had a good impact on prescription quality but was ineffective in reducing prices. The Coordinating Commission for Negotiating the Price of Medicines and other Health Supplies also failed to obtain adequate prices. To maximize purchase efficiency, policy makers should focus on finding long-term legal and political safeguards to counter the high prices imposed by pharmaceutical companies.

  8. Price

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The price terms in wheeling contracts very substantially, reflecting the differing conditions affecting the parties contracting for the service. These terms differ in the manner in which rates are calculated, the formulas used, and the philosophy underlying the accord. For example, and EEI study found that firm wheeling rates ranged from 20 cents to $1.612 per kilowatt per month. Nonfirm rates ranged from .15 mills to 5.25 mills per kilowatt-hour. The focus in this chapter is on cost-based rates, reflecting the fact that the vast majority of existing contracts are based on rate designs reflecting embedded costs. This situation may change in the future, but, for now, this fact can't be ignored

  9. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    ‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which......, which gives the book a challenging contribution to the existing body of knowledge....

  10. 49 CFR 19.45 - Cost and price analysis.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Cost and price analysis. 19.45 Section 19.45... Requirements Procurement Standards § 19.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price...

  11. 29 CFR 95.45 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Cost and price analysis. 95.45 Section 95.45 Labor Office of... Procurement Standards § 95.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...

  12. 41 CFR 51-5.5 - Prices.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Prices. 51-5.5 Section 51.... (a) The prices for items on the Procurement List are fair market prices established by the Committee... revising the fair market prices for services on the Procurement List, upon request from the central...

  13. A Blueprint for Effective and Adaptable School District Procurement

    Science.gov (United States)

    Maas, Tricia; Lake, Robin

    2015-01-01

    In public education, procurement reform has been all but ignored in policy discussions and procurement policies have remained virtually untouched. But the high price of ignoring procurement is becoming clear to people trying to reform education on the ground. Often involving long, cumbersome processes and risk-averse central office cultures,…

  14. Sustainable Procurement

    DEFF Research Database (Denmark)

    Telles, Pedro; Ølykke, Grith Skovgaard

    2017-01-01

    and within it how sustainable requirements have increased the level of compliance required, particularly regulatory compliance. Compliance was already present in previous EU public procurement frameworks, but its extent on Directive 2014/24/EU leads the authors to consider the current legal framework...

  15. A method for understanding generic procurement of HIV medicines by developing countries with patent protection.

    Science.gov (United States)

    Beall, Reed F; Attaran, Amir

    2017-07-01

    Patent protection on medicines may frustrate access by blocking generic competition. Nevertheless, circumstances may still allow for generic procurement to occur anyway, especially for humanitarian cause. But to what extent does this occur? And which legal flexibilities may facilitate such procurement? We attempted to design a replicable methodology that involved linking antiretroviral (ARV) patent data (1260 patents for 12 medicines) from a World Intellectual Property Organization patent study on the 2013 World Health Organization's (WHO) Model List of Essential Medicines to all available matching procurement records in the WHO's Global Price Reporting Mechanism. We then cross-referenced these with lists of legal flexibilities which facilitate generic access where patents have been granted (e.g., supplier companies' patent non-enforcement policies, voluntary and compulsory licenses) to estimate plausible relevance. The patent data corresponded to 1924 generic procurement transactions (1.34 billion units) from 85 countries. While patents were relatively less common in these countries (the median coverage was 20%), over half (53%) of the generic procurements nevertheless aligned with patent protection in the exporting and/or importing country. The disproportionately high relevance of patents despite their lower numbers can be explained by their presence in key medicine-exporting countries and/or those with larger populations. We noted, however, that developing countries still seemed able to buy generic versions of these essential ARVs. A combination of legal flexibilities may have played important roles, but voluntary licensing agreements (VLs) between originator companies and generic ones appeared to align with the largest volumes of generic procurement where we estimated patent protection. If true, VLs may warrant proportionate attention from observers as a heavily relied upon international mechanism for facilitating generic access so that the implications can be

  16. Modeling HIV/AIDS drug price determinants in Brazil: is generic competition a myth?

    Science.gov (United States)

    Meiners, Constance; Sagaon-Teyssier, Luis; Hasenclever, Lia; Moatti, Jean-Paul

    2011-01-01

    Brazil became the first developing country to guarantee free and universal access to HIV/AIDS treatment, with antiretroviral drugs (ARVs) being delivered to nearly 190,000 patients. The analysis of ARV price evolution and market dynamics in Brazil can help anticipate issues soon to afflict other developing countries, as the 2010 revision of the World Health Organization guidelines shifts demand towards more expensive treatments, and, at the same time, current evolution of international legislation and trade agreements on intellectual property rights may reduce availability of generic drugs for HIV care. Our analyses are based on effective prices paid for ARV procurement in Brazil between 1996 and 2009. Data panel structure was exploited to gather ex-ante and ex-post information and address various sources of statistical bias. In-difference estimation offered in-depth information on ARV market characteristics which significantly influence prices. Although overall ARV prices follow a declining trend, changing characteristics in the generic segment help explain recent increase in generic ARV prices. Our results show that generic suppliers are more likely to respond to factors influencing demand size and market competition, while originator suppliers tend to set prices strategically to offset compulsory licensing threats and generic competition. In order to guarantee the long term sustainability of access to antiretroviral treatment, our findings highlight the importance of preserving and stimulating generic market dynamics to sustain developing countries' bargaining power in price negotiations undertaken with originator companies.

  17. Modeling HIV/AIDS drug price determinants in Brazil: is generic competition a myth?

    Directory of Open Access Journals (Sweden)

    Constance Meiners

    Full Text Available BACKGROUND: Brazil became the first developing country to guarantee free and universal access to HIV/AIDS treatment, with antiretroviral drugs (ARVs being delivered to nearly 190,000 patients. The analysis of ARV price evolution and market dynamics in Brazil can help anticipate issues soon to afflict other developing countries, as the 2010 revision of the World Health Organization guidelines shifts demand towards more expensive treatments, and, at the same time, current evolution of international legislation and trade agreements on intellectual property rights may reduce availability of generic drugs for HIV care. METHODS AND FINDINGS: Our analyses are based on effective prices paid for ARV procurement in Brazil between 1996 and 2009. Data panel structure was exploited to gather ex-ante and ex-post information and address various sources of statistical bias. In-difference estimation offered in-depth information on ARV market characteristics which significantly influence prices. Although overall ARV prices follow a declining trend, changing characteristics in the generic segment help explain recent increase in generic ARV prices. Our results show that generic suppliers are more likely to respond to factors influencing demand size and market competition, while originator suppliers tend to set prices strategically to offset compulsory licensing threats and generic competition. SIGNIFICANCE: In order to guarantee the long term sustainability of access to antiretroviral treatment, our findings highlight the importance of preserving and stimulating generic market dynamics to sustain developing countries' bargaining power in price negotiations undertaken with originator companies.

  18. Procurement Options for New Renewable Electricity Supply

    Energy Technology Data Exchange (ETDEWEB)

    Kreycik, C. E.; Couture, T. D.; Cory, K. S.

    2011-12-01

    State renewable portfolio standard (RPS) policies require utilities and load-serving entities (LSEs) to procure renewable energy generation. Utility procurement options may be a function of state policy and regulatory preferences, and in some cases, may be dictated by legislative authority. Utilities and LSEs commonly use competitive solicitations or bilateral contracting to procure renewable energy supply to meet RPS mandates. However, policymakers and regulators in several states are beginning to explore the use of alternatives, namely feed-in tariffs (FITs) and auctions to procure renewable energy supply. This report evaluates four procurement strategies (competitive solicitations, bilateral contracting, FITs, and auctions) against four main criteria: (1) pricing; (2) complexity and efficiency of the procurement process; (3) impacts on developers access to markets; and (4) ability to complement utility decision-making processes. These criteria were chosen because they take into account the perspective of each group of stakeholders: ratepayers, regulators, utilities, investors, and developers.

  19. 22 CFR 145.45 - Cost and price analysis.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Cost and price analysis. 145.45 Section 145.45....45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various...

  20. 14 CFR 1260.145 - Cost and price analysis.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Cost and price analysis. 1260.145 Section... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...

  1. 43 CFR 12.945 - Cost and price analysis.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Cost and price analysis. 12.945 Section 12... Requirements § 12.945 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...

  2. 40 CFR 30.45 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Cost and price analysis. 30.45 Section... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...

  3. 41 CFR 105-72.505 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Cost and price analysis... § 105-72.505 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...

  4. 7 CFR 3019.45 - Cost and price analysis.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Cost and price analysis. 3019.45 Section 3019.45... Standards § 3019.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...

  5. 38 CFR 49.45 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Cost and price analysis... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...

  6. 24 CFR 84.45 - Cost and price analysis.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Cost and price analysis. 84.45....45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various...

  7. 32 CFR 32.45 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Cost and price analysis. 32.45 Section 32.45... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...

  8. Supply Chain Shipment Pricing Data

    Data.gov (United States)

    US Agency for International Development — This data set provides supply chain health commodity shipment and pricing data. Specifically, the data set identifies Antiretroviral (ARV) and HIV lab shipments to...

  9. Note from the editor: [trade - procurement - labour standards

    NARCIS (Netherlands)

    Cremers, J.

    2014-01-01

    In this issue of CLR-News we report on the long track that was necessary to improve the EU procurement rules, in order to get rid of the lowest price dogma. Public procurement is about spending public money, and that is not a technical thing, as the business lobbyist are used to arguing, but a

  10. 28 CFR 70.45 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Cost and price analysis. 70.45 Section 70... NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 70.45 Cost and price analysis. Some form of cost or price analysis must be made and documented in the procurement files in connection...

  11. 45 CFR 74.45 - Cost and price analysis.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Cost and price analysis. 74.45 Section 74.45... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Procurement Standards § 74.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in...

  12. 14 CFR 1274.506 - Cost and price analysis.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Cost and price analysis. 1274.506 Section... WITH COMMERCIAL FIRMS Procurement Standards § 1274.506 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every...

  13. 22 CFR 226.45 - Cost and price analysis.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Cost and price analysis. 226.45 Section 226.45...-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with...

  14. 15 CFR 14.45 - Cost and price analysis.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Cost and price analysis. 14.45 Section... COMMERCIAL ORGANIZATIONS Post-Award Requirements Procurement Standards § 14.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with...

  15. 20 CFR 627.420 - Procurement.

    Science.gov (United States)

    2010-04-01

    ...; (vi) Specifying only a “brand name” product instead of allowing “an equal” product to be offered and... bids or proposals. A cost analysis is necessary when the offeror is required to submit the elements of... agency shall negotiate profit or program income as a separate element of the price for each procurement...

  16. 40 CFR 35.6565 - Procurement methods.

    Science.gov (United States)

    2010-07-01

    ... the business; and (iii) The procurement lends itself to a fixed-price contract and the selection of... advantage of; and (v) If there is a sound documented reason, the recipient may reject any or all bids. (c) Competitive proposals. The technique of competitive proposals is normally conducted with more than one source...

  17. 29 CFR 1470.36 - Procurement.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Procurement. 1470.36 Section 1470.36 Labor Regulations Relating to Labor (Continued) FEDERAL MEDIATION AND CONCILIATION SERVICE UNIFORM ADMINISTRATIVE... resonableness can be established on the basis of a catalog or market price of a commercial product sold in...

  18. E-Procurement Success

    National Research Council Canada - National Science Library

    Eaton, Jason

    2003-01-01

    .... Through review and analysis of various e-Procurement projects, factors attributing to successful implementation of e-Procurement systems will be deduced and provided as a useful guide for federal...

  19. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laiho, Aki; Laine, Jari

    in future studies in the fields of hybrid procurement organizations, global sourcing organizations as well as international procurement offices (IPOs). From a practical standpoint, an assessment of external and internal contingencies provides the opportunity to consciously match organization to its...

  20. Procurement Tracking System (PTS)

    Data.gov (United States)

    Office of Personnel Management — The Procurement Tracking System (PTS) is used solely by the procurement staff of the Office of the Inspector General (OIG) at the U.S. Office of Personnel Management...

  1. PRICE AND PRICING STRATEGIES

    OpenAIRE

    SUCIU Titus

    2013-01-01

    In individual companies, price is one significant factor in achieving marketing success. In many purchase situations, price can be of great importance to customers. Marketers must establish pricing strategies that are compatible with the rest of the marketing mix. Management should decide whether to charge the same price to all similar buyers of identical quantities of a product (a one-price strategy) or to set different prices (a flexible price strategy). Many organizations, especially retai...

  2. Indonesia - Procurement Modernization

    Data.gov (United States)

    Millennium Challenge Corporation — The evaluation seeks to establish evidence on the possible effects of an intervention designed to modernize public procurement: effects on cost savings, performance...

  3. Public Procurement and Innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Max Rolfstam examines the increasing emphasis on public procurement as a means to stimulate innovation and the theoretical implications of this policy development. While ‘regular’ public procurement may be regarded as the outcome of anonymous market processes, public procurement of innovation must...... be understood as a special case of innovation, where social processes – and consequently the institutions governing these social processes – need to be considered. This book contributes to our understanding with a detailed institutional analysis of the public procurement of innovation....

  4. Indonesia - Procurement Modernization Project

    Data.gov (United States)

    Millennium Challenge Corporation — The evaluation seeks to establish evidence on the possible effects of an intervention designed to modernize public procurement: effects on cost savings, performance...

  5. IEA Task 24 Solar procurement 2000

    Energy Technology Data Exchange (ETDEWEB)

    Ellehauge, K.; Oestergaard, I. [Teknologisk Institut, Taastrup. SolEnergiCentret (Denmark); Gramkow, L. [Esbensen, Copenhagen (Denmark)

    2002-04-01

    The objective of the project is to develop and improve large procurements of solar heating systems in order to be able to place large orders with manufacturers and suppliers. The project work will be carried out as an international co-operation under IEA Task 24 with the title 'Solar Procurement'. By co-ordinating the effort between the 4-6 participating countries, the objective is to purchase at least 10,000 solar heating systems, of this amount 1,000-2,000 in Denmark. Such large orders make it possible for manufacturers and suppliers to deliver systems considerably cheaper, and it will be possible to develop systems for given specifications on output and efficiency. These co-ordinated large orders are expected to improve the price/efficiency conditions by up to 50%. The so called 'procurement process' (co-ordinated international procurement based on goal-oriented system development in co-operation between customers and suppliers/manufacturers) will in the project be followed up by information/marketing, education, financing schemes, service schemes, quality assurance and technical support. The project is divided into two main areas (IEA subtasks). 1: 'Procurement and Marketing' and 2: 'Creation of Tools'. Denmark has been requested to be the project manager of subtask 2, 'Creation of Tools'. (EHS)

  6. IEA Task 24 Solar procurement 2000

    International Nuclear Information System (INIS)

    Ellehauge, K.; Oestergaard, I.; Gramkow, L.

    2002-04-01

    The objective of the project is to develop and improve large procurements of solar heating systems in order to be able to place large orders with manufacturers and suppliers. The project work will be carried out as an international co-operation under IEA Task 24 with the title 'Solar Procurement'. By co-ordinating the effort between the 4-6 participating countries, the objective is to purchase at least 10,000 solar heating systems, of this amount 1,000-2,000 in Denmark. Such large orders make it possible for manufacturers and suppliers to deliver systems considerably cheaper, and it will be possible to develop systems for given specifications on output and efficiency. These co-ordinated large orders are expected to improve the price/efficiency conditions by up to 50%. The so called 'procurement process' (co-ordinated international procurement based on goal-oriented system development in co-operation between customers and suppliers/manufacturers) will in the project be followed up by information/marketing, education, financing schemes, service schemes, quality assurance and technical support. The project is divided into two main areas (IEA subtasks). 1: 'Procurement and Marketing' and 2: 'Creation of Tools'. Denmark has been requested to be the project manager of subtask 2, 'Creation of Tools'. (EHS)

  7. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laine, Jari; Mugurusi, Godfrey

    in future studies in the fields of hybrid procurement organizations, global sourcing organizations as well as international procurement offices (IPOs). From a practical standpoint, an assessment of external and internal contingencies and their relation to specific structural dimensions that can be chosen...

  8. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laine, Jari; Mugurusi, Godfrey

    Procurement has to find further levers and advance its contribution to corporate goals continuously. This places pressure on its organization in order to facilitate its performance. Therefore, procurement organizations constantly have to evolve in order to match these demands. A conceptual model...... putting the structural elements in focus is derived from the analysis of two case companies, which extends the existing literature and opens new avenues for future research. The findings highlight the importance of taking a contingency perspective on procurement organization, understanding the internal...... in future studies in the fields of hybrid procurement organizations, global sourcing organizations as well as international procurement offices (IPOs). From a practical standpoint, an assessment of external and internal contingencies and their relation to specific structural dimensions that can be chosen...

  9. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laiho, Aki; Laine, Jari

    Procurement has to find further levers and advance its contribution to corporate goals continuously. This places pressure on its organization in order to facilitate its performance. Therefore, Procurement organizations constantly have to evolve in order to match these demands. A conceptual model...... is presented and results of a first case study discussed. The findings highlight the importance of taking a contingency perspective on Procurement organization, understanding the internal and internal contingency factors. From a theoretical perspective, it opens up insights that can be furthermore leveraged...... in future studies in the fields of hybrid procurement organizations, global sourcing organizations as well as international procurement offices (IPOs). From a practical standpoint, an assessment of external and internal contingencies provides the opportunity to consciously match organization to its...

  10. Long-term costs and health impact of continued global fund support for antiretroviral therapy.

    Directory of Open Access Journals (Sweden)

    John Stover

    Full Text Available BACKGROUND: By the end of 2011 Global Fund investments will be supporting 3.5 million people on antiretroviral therapy (ART in 104 low- and middle-income countries. We estimated the cost and health impact of continuing treatment for these patients through 2020. METHODS AND FINDINGS: Survival on first-line and second-line ART regimens is estimated based on annual retention rates reported by national AIDS programs. Costs per patient-year were calculated from country-reported ARV procurement prices, and expenditures on laboratory tests, health care utilization and end-of-life care from in-depth costing studies. Of the 3.5 million ART patients in 2011, 2.3 million will still need treatment in 2020. The annual cost of maintaining ART falls from $1.9 billion in 2011 to $1.7 billion in 2020, as a result of a declining number of surviving patients partially offset by increasing costs as more patients migrate to second-line therapy. The Global Fund is expected to continue being a major contributor to meeting this financial need, alongside other international funders and domestic resources. Costs would be $150 million less in 2020 with an annual 5% decline in first-line ARV prices and $150-370 million less with a 5%-12% annual decline in second-line prices, but $200 million higher in 2020 with phase out of stavudine (d4T, or $200 million higher with increased migration to second-line regimens expected if all countries routinely adopted viral load monitoring. Deaths postponed by ART correspond to 830,000 life-years saved in 2011, increasing to around 2.3 million life-years every year between 2015 and 2020. CONCLUSIONS: Annual patient-level direct costs of supporting a patient cohort remain fairly stable over 2011-2020, if current antiretroviral prices and delivery costs are maintained. Second-line antiretroviral prices are a major cost driver, underscoring the importance of investing in treatment quality to improve retention on first-line regimens.

  11. Fighting corruption in tactical procurement

    NARCIS (Netherlands)

    Obanda Wanyama, Peter

    2010-01-01

    Vast amount of public resources are spent on procurement. Effective public procurement yields additional budget space, hence it ought to be conducted with due diligence. However, public procurement most especially tactical procurement in local governments in Uganda is vulnerable to corruption. In

  12. Collaborative Procurement Initiative

    Science.gov (United States)

    GPP's Clean Energy Collaborative Procurement Initiative provides a platform for deploying clean energy technologies across multiple government and educational organizations for maximum impact on installed solar system capacity and local economic activity.

  13. Military Working Dog Procurements

    Science.gov (United States)

    2000-03-14

    1998 and 1999 showed that the Europeans did not have an advantage in the selection of their dogs . Officials of the 341st TRS offered two possible...DISTRIBUTION STATEMENT A Approved for Public Release Distribution Unlimited MILITARY WORKING DOG PROCUREMENTS Report No. D-2000-102 March 14...A . Report Title: Military Working Dog Procurements B. DATE Report Downloaded From the Internet: 03/28/99 C. Report’s Point of Contact: (Name

  14. Defense Primer: Procurement

    Science.gov (United States)

    2017-02-10

    capital assets, such as an F-35 Joint Strike Fighter or a Virginia-class submarine. Investment costs are distinguished from expenses, which are...procurement funds before a formal Milestone C approval. How else does DOD purchase goods and services? How does DOD procurement relate to defense...purchase services (e.g., research, architectural design, or cleaning services) and smaller goods (e.g., gauze or light bulbs) because such purchases

  15. Optimization of Freight Procurement.

    OpenAIRE

    Ndahi Mubiri, Gabriel

    2016-01-01

    Freight and logistics industries have seen a significant growth over the last decade, and this growth requires better and more optimized solutions. The present study aimed at examining strategies that could be used in the optimization of the procurement at Jomo Kenyatta International Airport. The study aimed at presenting an effective framework for addressing the challenges in procurement and optimizing the performance of the department. This was hoped to result in an effective perfor...

  16. Enhancing medicine price transparency through price information mechanisms.

    Science.gov (United States)

    Hinsch, Michael; Kaddar, Miloud; Schmitt, Sarah

    2014-05-08

    Medicine price information mechanisms provide an essential tool to countries that seek a better understanding of product availability, market prices and price compositions of individual medicines. To be effective and contribute to cost savings, these mechanisms need to consider prices in their particular contexts when comparing between countries. This article discusses in what ways medicine price information mechanisms can contribute to increased price transparency and how this may affect access to medicines for developing countries. We used data collected during the course of a WHO project focusing on the development of a vaccine price and procurement information mechanism. The project collected information from six medicine price information mechanisms and interviewed data managers and technical experts on key aspects as well as observed market effects of these mechanisms.The reviewed mechanisms were broken down into categories including objective and target audience, as well as the sources, types and volumes of data included. Information provided by the mechanisms was reviewed according to data available on medicine prices, product characteristics, and procurement modalities. We found indications of positive effects on access to medicines resulting from the utilization of the reviewed mechanisms. These include the uptake of higher quality medicines, more favorable results from contract negotiations, changes in national pricing policies, and the decrease of prices in certain segments for countries participating in or deriving data from the various mechanisms. The reviewed mechanisms avoid the methodological challenges observed for medicine price comparisons that only use national price databases. They work with high quality data and display prices in the appropriate context of procurement modalities as well as the peculiarities of purchasing countries. Medicine price information mechanisms respond to the need for increased medicine price transparency and have the

  17. Criteria in consultant selection: public procurement of architectural and engineering services

    Directory of Open Access Journals (Sweden)

    Josefin Sporrong

    2011-12-01

    Full Text Available The competence, commitment and attitudes of design consultants strongly influence the quality and costs of built facilities. However, in the selection of professional services it is often difficult to specify and assess non-price criteria related to both firms and individual consultants. Therefore, clients traditionally rely on long term relations or recommendations from clients or colleagues. Public procurement regulation, however, restricts the use of such informal data. This study seeks to understand how procurers act to reconcile these conflicting demands.An explorative questionnaire survey distributed to Swedish municipalities investigates which selection criteria and information sources are used, as well as perceived difficulties and shortcomings related to consultancy procurement. Results show a high focus on price or more easily measured non-price criteria. This might limit the ability of municipal officials to evaluate consultant competence, especially aspects related to design and execution of projects. Furthermore, personal information sources are widely used, indicating a conflict between procurement practice and existing regulation. Unexpectedly, procurement officials were generally satisfied with their procurement practice. However, managers and more experienced procurers tend to be more satisfied than other officials. Satisfaction also appears to be connected to the existence of a procurement policy and more advanced selection methods. Keywords: public procurement, selection, consultants, Sweden

  18. Optimizing antiretroviral product selection: a sample approach to improving patient outcomes, saving money, and scaling-up health services in developing countries.

    Science.gov (United States)

    Amole, Carolyn D; Brisebois, Catherine; Essajee, Shaffiq; Koehler, Erin; Levin, Andrew D; Moore, Meredith C; Brown Ripin, David H; Sickler, Joanna J; Singh, Inder R

    2011-08-01

    Over the last decade, increased funding to support HIV treatment programs has enabled millions of new patients in developing countries to access the medications they need. Today, although demand for antiretrovirals continues to grow, the financial crisis has severely constrained funding leaving countries with difficult choices on program prioritization. Product optimization is one solution countries can pursue to continue to improve patient care while also uncovering savings that can be used for further scale up or other health system needs. Program managers can make procurement decisions that actually reduce program costs by considering additional factors beyond World Health Organization guidelines when making procurement decisions. These include in-country product availability, convenience, price, and logistics such as supply chain implications and laboratory testing requirements. Three immediate product selection opportunities in the HIV space include using boosted atazanavir in place of lopinovir for second-line therapy, lamivudine instead of emtricitabine in both first-line and second-line therapy, and tenofovir + lamivudine over abacavir + didanosine in second-line therapy. If these 3 opportunities were broadly implemented in sub-Saharan Africa and India today, approximately $300 million of savings would be realized over the next 5 years, enabling hundreds of thousands of additional patients to be treated. Although the discussion herein is specific to antriretrovirals, the principles of product selection are generalizable to diseases with multiple treatment options and fungible commodity procurement. Identifying and implementing approaches to overcome health system inefficiencies will help sustain and may expand quality care in resource-limited settings.

  19. Photovoltaic procurement strategies: an assessment of supply issues

    Energy Technology Data Exchange (ETDEWEB)

    Posner, D.; Costello, D.

    1980-02-01

    This review report presents the results of an analysis of alternative approaches to the design of a federal photovoltaics procurement program. Advantages and disadvantages of large purchases at fixed prices and smaller purchases for testing and demonstrating the technology are presented. The objectives and possible impacts of these purchase programs on the photovoltaic industry are described. The reactions of the industry to alternative purchase programs were assessed using personal interviews with selected companies currently active in photovoltaics. The report begins with a review of the impacts of federal procurements on other innovations, including the electronics industry, and suggests the relation of these procurements to photovoltaics. The methodology for conducting the interviews is presented next. The results of the interviews are summarized into possible scenarios of future developments in the industry and into discussions of key issues in the design of a procurement program. An appendix on the current structure of the photovoltaic industry is provided.

  20. Access to hepatitis C virus treatment: Lessons from implementation of strategies for increasing access to antiretroviral treatment.

    Science.gov (United States)

    Assefa, Yibeltal; Hill, Peter S; Williams, Owain D

    2018-03-14

    At September's 2017 United Nations General Assembly, a state-of-the-art HIV medicine was announced to be made available at just $75 per person per year. There have been a number of strategies that the global AIDS community and countries have utilized to reduce prices and make antiretrovirals (ARVs) accessible for people living with HIV/AIDS. There appears to be an opportunity for the treatment of hepatitis C virus infection using direct-acting antivirals (DAAs) to benefit from the often painful and laboured history of driving down the prices of ARVs. In general, the success of lowering prices for ARVs has stemmed from the politics needed to initially support generic entry into the on-patent market. The use of flexibilities present in the World Trade Organization's Agreement on Trade-Related Aspects of Intellectual Property Rights (TRIPS) have been used to overcome patent barriers, with the use of compulsory licenses and/or the threat of their use as instruments for strengthening the bargaining power in price negotiations. These strategies have been combined with new financing mechanisms that have promoted more effective procurement and price negotiations. Partnership among the different stakeholders has also been critical in this regard. Countries have also invested in their health systems and implemented several strategies to reduce stigma and discrimination to increase access to and improve utilization of ARVs. This article suggests that any future international initiatives to increase access to DAAs can learn from these lessons surrounding price reduction, improved financing, advocacy, as well as health systems strengthening and stigma reduction. Adopting and reconfiguring these strategies will also incur substantial savings in time, money and lives. Crown Copyright © 2018. Published by Elsevier Ltd. All rights reserved.

  1. Sustainable Bridge Infrastructure Procurement

    DEFF Research Database (Denmark)

    Safi, Mohammed; Du, Guangli; Simonsson, Peter

    2016-01-01

    The lack of a flexible but systematic approach for integrating lifecycle aspects into bridge investment decisions is a major obstacle hindering the procurement of sustainable bridge infrastructures. This paper addresses this obstacle by introducing a holistic approach that agencies could use to p...... to procure the most “sustainable” (lifecycle-efficient) bridge through a fair design-build (D-B) tendering process, considering all the main aspects: life-cycle cost (LCC), service life-span, aesthetic demands and environmental impacts (LCA)....

  2. A procurement decision support mechanism on multi-attribute fuzzy-interval auctions

    DEFF Research Database (Denmark)

    Franco de los Ríos, Camilo; Hougaard, Jens Leth; Nielsen, Kurt

    2016-01-01

    Procurement systems are the basis for assuring efficiency and fairness in organizations. Consequently, the development of procurement systems faces an ongoing challenge in designing trading systems that facilitate transparent competition on both price and multiple attributes, as well as ensuring ...... the flexibility of the procurement process and its reliability for decision making under uncertainty....... sufficient flexibility for operational purposes. As multi-attribute auctions may specify transparent rules for the procurement game, they allow for less flexibility as they rely on precise scores. Here we propose a decision support methodology, based on multicriteria (out)ranking techniques, for enhancing...

  3. 41 CFR 51-2.7 - Fair market price.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Fair market price. 51-2.7... WHO ARE BLIND OR SEVERELY DISABLED § 51-2.7 Fair market price. (a) The Committee is responsible for determining fair market prices, and changes thereto, for commodities and services on the Procurement List. The...

  4. 40 CFR 35.6585 - Cost and price analysis.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Cost and price analysis. 35.6585... Response Actions Procurement Requirements Under A Cooperative Agreement § 35.6585 Cost and price analysis. (a) General. The recipient must conduct and document a cost or price analysis in connection with...

  5. 45 CFR 2543.45 - Cost and price analysis.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Cost and price analysis. 2543.45 Section 2543.45... ORGANIZATIONS Post-Award Requirements Property Standards § 2543.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every...

  6. Antiretroviral therapeutic drug monitoring

    African Journals Online (AJOL)

    Winnie

    A narrow therapeutic window. □ Good correlation between drug ... Antiretroviral therapeutic drug monitoring (TDM) is an additional monitoring tool to assist in the management of HIV-infected patients. Antiretroviral TDM is ... Antiretroviral TDM could play an important adjunctive role in our area. Clearly this will be a limited ...

  7. Woodfuel procurement strategies of district heating plants

    International Nuclear Information System (INIS)

    Roos, A.; Bohlin, F.; Hektor, B.; Hillring, B.

    2003-01-01

    Woodfuel use in the Swedish district heating sector increased significantly from 1985 to 1999. This study analysed strategies and considerations concerning woodfuel procurement in district heating plants. Priorities and concerns in the industry involved an increased woodfuel share, ambitions to create an environmental image, cost minimisation, awareness about the role of energy policies for fuel choice, improvement of woodfuel quality and the ambition to maintain a competitive woodfuel market with several suppliers. Factor analysis yielded five dimensions in the woodfuel procurement strategies among the district heating companies: (1) increased woodfuel use; (2) import; (3) spot market woodfuel purchases; (4) focus on refined woodfuels; and (5) using price only when deciding whether to use woodfuels or other fuels. Five clusters were defined along the three strategy dimensions (1)-(3). The clusters differed concerning size, experiences from the introduction of woodfuels, perceptions about woodfuels and strategies employed to date. This paper describes different strategies that the district heating companies apply on the woodfuel market. The conclusion is that policies should consider this diversity in procurement strategies, mitigate their negative side-effects and assist to make them cost-effective. (author)

  8. Healthy Food Procurement Policies and Their Impact

    Science.gov (United States)

    Niebylski, Mark L.; Lu, Tammy; Campbell, Norm R. C.; Arcand, Joanne; Schermel, Alyssa; Hua, Diane; Yeates, Karen E.; Tobe, Sheldon W.; Twohig, Patrick A.; L’Abbé, Mary R.; Liu, Peter P.

    2014-01-01

    Unhealthy eating is the leading risk for death and disability globally. As a result, the World Health Organization (WHO) has called for population health interventions. One of the proposed interventions is to ensure healthy foods are available by implementing healthy food procurement policies. The objective of this systematic review was to evaluate the evidence base assessing the impact of such policies. A comprehensive review was conducted by searching PubMed and Medline for policies that had been implemented and evaluated the impact of food purchases, food consumption, and behaviors towards healthy foods. Thirty-four studies were identified and found to be effective at increasing the availability and purchases of healthy food and decreasing purchases of unhealthy food. Most policies also had other components such as education, price reductions, and health interventions. The multiple gaps in research identified by this review suggest that additional research and ongoing evaluation of food procurement programs is required. Implementation of healthy food procurement policies in schools, worksites, hospitals, care homes, correctional facilities, government institutions, and remote communities increase markers of healthy eating. Prior or simultaneous implementation of ancillary education about healthy eating, and rationale for the policy may be critical success factors and additional research is needed. PMID:24595213

  9. PROCUREMENT AND CONTRACT MANAGEMENT

    CERN Multimedia

    Training & Development Group; Linda Orr-Easo; Tel. 72460; Nathalie Dumeaux; Tel. 78144

    2001-01-01

    We are pleased to announce the launch of a new training on: Procurement and Contract Management (This seminar will be run by CERN experts in French or in English) Level 1 The aim is to raise awareness of the key issues involved. Date : 8 June 2001 This level is open to everyone. Participants should register via our Web page as soon as possible. Level 2 To develop the skills needed to effectively manage contracts, from the Technical, Commercial and Legal aspects. Dates : Three days, Autumn 2001 This Level is open to those who are/will be more directly responsible for procurement and contract management. Participants should have followed Level 1. For a description of the seminar, please consult:   Level 1: http://training.web.cern.ch/Training/MANCO/P9798/9-cm_e.htm Level 2: http://training.web.cern.ch/Training/MANCO/P9798/9-cm2_e.htm

  10. Procurement and participation opportunities

    International Nuclear Information System (INIS)

    Lovatt, D.

    1998-01-01

    The elements which drive the Sable Offshore Energy Project and its procurement processes were described. The project is privately financed, hence business practices must adhere to strict principles to be able to compete with alternative energy sources and to ensure success for all stakeholders including owners, contractors, suppliers and the business community. One of the objectives of the project is to adhere to the requirements of applicable legislation and not to compromise health, safety and environmental standards. To ensure this compliance by all concerned, the regulatory requirements are embedded in the contracting and procurement procedures. Details of the procurement cycle are described. A list of some of the successes that Nova Scotian companies have had in getting work on the project was provided as an illustration of the ingenuity and foresight of these companies to develop appropriate quality assurance and health, safety and environmental procedures, and to bring in the needed capacity and technology through the formation of joint ventures and alliances. The list of contracts represents more than 100 million dollars worth of work to date. 3 figs

  11. Pro short-term procurement - U.S. utility

    International Nuclear Information System (INIS)

    Thompson, R.D.

    1990-01-01

    The author expresses the opinion that rather than focusing market discussions around short-term versus long-term procurement strategies, the parties need to be focusing on how long it is going to take to get to a predominantly market-based price both in uranium and enrichment. Long-term contracts are going to be around and will always be an important part of buyers' and sellers' strategies. It is evident that the annual term contract price renegotiations around the world are resulting in continually lower prices. When these price negotiations finally arrive in the range of the market price, a commodity market that resembles other energy commodity markets can be obtained

  12. Multicriteria analysis in public procurement

    Directory of Open Access Journals (Sweden)

    Dejan T. Tošev

    2012-07-01

    Full Text Available The public procurement is one of the most important processes in modern company daily business. The quality of that process and its realization affect the overall company success and reputation. For that purpose, the management is obliged to prepare and carry out the procurement process carefully. The process is based on multicriteria tendering and the purpose of this paper is to present the analytical and hierarchical procurement methods in order to minimize failing in the selection and decision making process.

  13. 32 CFR 553.11 - Procurement.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Procurement. 553.11 Section 553.11 National... CEMETERIES ARMY NATIONAL CEMETERIES § 553.11 Procurement. Cemetery supplies and services will be procured in accordance with the provisions of the Armed Services Procurement Regulation (ASPR) and the Army Procurement...

  14. Dynamic Pricing

    DEFF Research Database (Denmark)

    Sharifi, Reza; Anvari-Moghaddam, Amjad; Fathi, S. Hamid

    2017-01-01

    Dynamic pricing scheme, also known as real-time pricing (RTP), can be more efficient and technically beneficial than the other price-based schemes (such as flat-rate or time-of-use (TOU) pricing) for enabling demand response (DR) actions. Over the past few years, advantages of RTP-based schemes h...

  15. Corruption in emergency procurement.

    Science.gov (United States)

    Schultz, Jessica; Søreide, Tina

    2008-12-01

    Corruption in emergency procurement reduces the resources available for life-saving operations, lowers the quality of products and services provided, and diverts aid from those who need it most.(1) It also negatively influences public support for humanitarian relief, both in the affected country and abroad. This paper aims to unpack and analyse the following question in order to mitigate risk: how and where does corruption typically occur, and what can be done? Suggested strategies reflect a multi-layered approach that stresses internal agency control mechanisms, conflict-sensitive management, and the need for common systems among operators.

  16. Procuring complex performance

    DEFF Research Database (Denmark)

    Hartmann, A.; Roehrich, J.; Frederiksen, Lars

    2014-01-01

    – The transition towards PCP can be best described as a learning process which cumulates the knowledge and experience in the client-supplier interaction accompanied by changing contractual and relational capabilities. In public infrastructure this process is not initially motivated by the benefits of value co......-creation, but is politically driven. Practical implications – The study proposes three generic transition stages towards increased performance and infrastructural complexity moderated by contract duration. These stages may help managers of public agencies to identify the current procurement level and the contractual...... adopting a longitudinal perspective on these interactions in the transition towards PCP....

  17. Price fairness

    OpenAIRE

    Diller, Hermann

    2013-01-01

    Purpose – The purpose of this article is to integrate the various strands of fair price research into a concise conceptual model. Design/methodology/approach – The proposed price fairness model is based on a review of the fair pricing literature, incorporating research reported in not only English but also German. Findings – The proposed fair price model depicts seven components of a fair price: distributive fairness, consistent behaviour, personal respect and regard for the partner, fair dea...

  18. Electricity procurement for large consumers based on Information Gap Decision Theory

    International Nuclear Information System (INIS)

    Zare, Kazem; Moghaddam, Mohsen Parsa; Sheikh El Eslami, Mohammad Kazem

    2010-01-01

    In the competitive electricity market, consumers seek strategies to meet their electricity needs at minimum cost and risk. This paper provides a technique based on Information Gap Decision Theory (IGDT) to assess different procurement strategies for large consumers. Supply sources include bilateral contracts, a limited self-generating facility, and the pool. It is considered that the pool price is uncertain and its volatility around the estimated value is modeled using an IGDT model. The proposed method does not minimize the procurement cost but assesses the risk aversion or risk-taking nature of some procurement strategies with regard to the minimum cost. Using this method, the robustness of experiencing costs higher than the expected one is optimized and the related strategy is determined. The proposed method deals with optimizing the opportunities to take advantage of low procurement costs or low pool prices. A case study is used to illustrate the proposed technique.

  19. Strategy for the procurement of electronics for the LHC experiments

    CERN Document Server

    2002-01-01

    At its meeting on 14 March 2001 the Finance Committee requested the preparation of a document outlining the strategy for future procurement of electronics for the LHC experiments. The bulk of the electronics for the LHC experiments is based on custom-developed designs, the manufacturing of which will be contracted out to industry using the CERN purchasing procedures to ensure competitive prices. Analysis of on-going procurement activities for the electronics for the LHC experiments shows that in almost all cases the application of the CERN purchasing procedures has resulted in bids from a sufficient number of qualified companies to ensure competitive prices and a reasonable distribution of returns between CERN Member States. There is no reason to expect that this pattern will change significantly for the electronics that still remains to be purchased to complete the construction of the LHC experiments.

  20. Sustaining access to antiretroviral therapy in the less-developed world: lessons from Brazil and Thailand.

    Science.gov (United States)

    Ford, Nathan; Wilson, David; Costa Chaves, Gabriela; Lotrowska, Michel; Kijtiwatchakul, Kannikar

    2007-07-01

    ANTIRETROVIRAL ROLLOUT IN BRAZIL AND THAILAND: Brazil and Thailand are among few developing countries to achieve universal access to antiretroviral therapy. Three factors were critical to this success: legislation for free access to treatment; public sector capacity to manufacture medicines; and strong civil society action to support government initiatives to improve access. LOCAL PRODUCTION OF AFFORDABLE, NON-PATENTED DRUGS: Many older antiretroviral drugs are not patented in either country and affordable generic versions are manufactured by local pharmaceutical institutes. Developing countries were not required to grant patents on medicines until 2005, but under US government threats of trade sanctions, Thailand and Brazil began doing so at least ten years prior to this date. Brazil has used price negotiations with multi-national pharmaceutical companies to lower the price of newer patented antiretrovirals. However, the prices obtained by this approach remain unaffordable. Thailand recently employed compulsory licensing for two antiretrovirals, obtaining substantial price reductions, both for generic and brand products. Following Thailand's example, Brazil has issued its first compulsory license. Middle-income countries are unable to pay the high prices of multinational pharmaceutical companies. By relying on negotiations with companies, Brazil pays up to four times more for some drugs compared with prices available internationally. Compulsory licensing has brought treatment with newer antiretrovirals within reach in Thailand, but has resulted in pressure from industry and the US government. An informed and engaged civil society is essential to support governments in putting health before trade.

  1. Procurement Officer | IDRC - International Development Research ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    , provides Centre‑wide procurement and logistics services, including but not limited to, procuring goods and services in accordance with IDRC policy and standards; providing guidance, advice and support to ensure procurement processes are ...

  2. CORRELATES OF PROCUREMENT PERFORMANCE OF ...

    African Journals Online (AJOL)

    Osondu

    2013-02-22

    Feb 22, 2013 ... their project delivery. Construction Procurement Strategies in Use. There are various procurement methods in use in construction for project delivery in. Nigeria. Such strategies include Traditional,. Design and Build, Project Management, Direct. Labour and Labour-only. Studies of. Ogunsanmi, Iyagba and ...

  3. Economic analysis of the influence of milk market concentration on procurement efficiency in the defense system

    Directory of Open Access Journals (Sweden)

    Mihajlović Milan

    2016-01-01

    Full Text Available Increasing efficiency during realization of procurements in the defence system imposes the requirement to analyze the market, in order to detect all of its characteristics and to make conclusions which would benefit during planning of budgetary assets by one comprehensive process. Procuring milk and milk products represents a significant part of defence system's procurements which represents that a significant segment of the consumer standard of the Serbian Army, which implies the interest of authors to point to the significance of the concentration of the supply branch on the realization of procurements on the example of this market. The aim of this paper is to display the state and actual trends on the market of production and processing of milk, define methodological framework and point to the intensity and terms of competition and their influence on procurement criteria, especially price in the defence system of the Republic of Serbia.

  4. Did a local distribution company procure prudently during the California electricity crisis?

    International Nuclear Information System (INIS)

    Woo, C.-K.; Lloyd, Debra; Clayton, William

    2006-01-01

    To manage cost risk, prudent procurement of electric power requires that some portion of a buyer's energy demand be met through long-term contracting. Under cost-of-service regulation or performance-based regulation, a local distribution company (LDC) should be allowed to fully recover all prudently incurred power procurement costs. However, the regulatory test of prudence is an ex post review with the threat of disallowance. This paper presents an economic analysis of procurement prudence involving a small LDC, Bear Valley Electric Service (BVES), which serves a resort area in Southern California. The key findings are: (a) high and volatile prices and rolling blackouts characterized the market environment faced by the owner of BVES, Southern California Water Company (SCWC), at its signing of a 5-year fixed price contract; (b) SCWC was a price-taker with no incentive to act imprudently; (c) the contract was obtained via a competitive bidding process; (d) the contract price was comparable to the benchmark price of contemporaneous contracts; (e) the fixed price contract was economic when compared to available alternatives; and (f) despite (a)-(e), a negotiated settlement with the state regulator and a large user resulted in substantial disallowance. The policy implication is that a regulator should approve a prudent procurement plan proposed by an LDC to remove the unreasonable risk of an ex post review. If the LDC strictly adheres to the plan, the resulting electricity purchases are per se prudent and should entitle the LDC to full cost recovery

  5. A procurement decision support mechanism on multi-attribute fuzzy-interval auctions

    DEFF Research Database (Denmark)

    Franco de los Ríos, Camilo; Hougaard, Jens Leth; Nielsen, Kurt

    2016-01-01

    Procurement systems are the basis for assuring efficiency and fairness in organizations. Consequently, the development of procurement systems faces an ongoing challenge in designing trading systems that facilitate transparent competition on both price and multiple attributes, as well as ensuring...... sufficient flexibility for operational purposes. As multi-attribute auctions may specify transparent rules for the procurement game, they allow for less flexibility as they rely on precise scores. Here we propose a decision support methodology, based on multicriteria (out)ranking techniques, for enhancing...

  6. Managing electricity procurement cost and risk by a local distribution company

    International Nuclear Information System (INIS)

    Chikeung Woo; Karimov, R.I.; Horowitz, I.

    2004-01-01

    A local electricity distribution company (LDC) can satisfy some of its future electricity requirements through self-generation and volatile spot markets, and the remainder through fixed-price forward contracts that will reduce its exposure to the inherent risk of spot-price volatility. A theoretical framework is developed for determining the forward-contract purchase that minimizes the LDCs expected procurement cost, subject to a cost-exposure constraint. The answers to the questions of ''What to buy?'' and ''How to buy?'' are illustrated using an example of a hypothetical LDC that is based on a municipal utility in Florida. It is shown that the LDCs procurement decision is consistent with least-cost procurement subject to a cost-exposure constraint, and that an internet-based multi-round auction can produce competitive price quotes for its desired forward purchase. (author)

  7. Managing electricity procurement cost and risk by a local distribution company

    International Nuclear Information System (INIS)

    Woo, C.-K.; Karimov, R.I.; Horowitz, Ira

    2004-01-01

    A local electricity distribution company (LDC) can satisfy some of its future electricity requirements through self-generation and volatile spot markets, and the remainder through fixed-price forward contracts that will reduce its exposure to the inherent risk of spot-price volatility. A theoretical framework is developed for determining the forward-contract purchase that minimizes the LDCs expected procurement cost, subject to a cost-exposure constraint. The answers to the questions of 'What to buy?' and 'How to buy?' are illustrated using an example of a hypothetical LDC that is based on a municipal utility in Florida. It is shown that the LDCs procurement decision is consistent with least-cost procurement subject to a cost-exposure constraint, and that an internet-based multi-round auction can produce competitive price quotes for its desired forward purchase

  8. The prices people pay for medicines in Zimbabwe.

    Science.gov (United States)

    Gavaza, P; Simoyi, T; Makunike, B; Maponga, C C

    2009-01-01

    To collect, analyse and compare prices of medicines in different sectors and parts of the country and to compare them with the medicine prices in other countries. A prospective cross sectional study. Pharmacy outlets in Zimbabwe comprising 27 retail pharmacies, 23 dispensing doctors, eight public hospital pharmacies and seven municipal clinics. Median price ratios, 25th percentiles and 75th percentiles. Innovator brands in the private sector were priced 10 times the International References Prices (IRP) and more than three times the price of generic medicines. Dispensing doctors were charging the highest prices for medicines and the public sector had the least prices. The national procurement agency, NatPharm, procured medicines at prices slightly below the Management Sciences for Health (MSH) prices. Prices of medicines in the public sector were higher than average prices for medicines from seven other African countries. Medicine prices in Zimbabwe are high, a scenario that may compromise affordability and accessibility to medicines especially by the poor. Urgent steps are needed to reduce the level and effect of the high prices on the population, especially the poor.

  9. Gas pricing in Europe. Pt. 1. Wholesale markets

    International Nuclear Information System (INIS)

    Donath, R.

    1996-01-01

    The article investigates gas pricing in the European procurement market and the wholesale markets of the most important EU consumer markets. It demonstrates that value-oriented pricing principles override cost-oriented pricing principles. For one thing, and independently of pricing principles, two- or three-part demand price systems or basic price systems are common. For another, the frequently encountered opportunities for the differentiation of prices show that as long as there is merely substitution competition instead of direct competition, gas suppliers have a certain degree of freedom in fixing their prices. By contrast, the introduction of direct competition in Great Britain has reduced suppliers' individual price fixing margins, because short-term supply and demand variations in the now created spot market are decisive for gas pricing. (orig.) [de

  10. Price Discrimination

    OpenAIRE

    Armstrong, M.

    2008-01-01

    This paper surveys recent economic research on price discrimination, both in monopoly and oligopoly markets. Topics include static and dynamic forms of price discrimination, and both final and input markets are considered. Potential antitrust aspects of price discrimination are highlighted throughout the paper. The paper argues that the informational requirements to make accurate policy are very great, and with most forms of price discrimination a laissez-faire policy may be the best availabl...

  11. Transfer Pricing

    OpenAIRE

    Larsen, Mads Grenaa; Nørgaard, Mads Frid; Hansen, Manjarita

    2013-01-01

    This project seeks to highlight some of the criticisms given towards the OECD Transfer Pricing Guidelines and the challenges Danish companies experience by pricing their goods and the problems this causes for trade. The project is based on a series of interviews that represent the different agents who are operating in Transfer Pricing business. These interviews, combined with the Transfer Pricing Guidelines, gives us the basis to analyse the challenges we want to clarify based on the hypothes...

  12. Gold prices

    OpenAIRE

    Joseph G. Haubrich

    1998-01-01

    The price of gold commands attention because it serves as an indicator of general price stability or inflation. But gold is also a commodity, used in jewelry and by industry, so demand and supply affect its pricing and need to be considered when gold is a factor in monetary policy decisions.

  13. (DeCentralization of Public Procurement at the Local Level in the EU

    Directory of Open Access Journals (Sweden)

    Boštjan BREZOVNIK

    2015-10-01

    Full Text Available The so-called decentralization of public procurement in EU Member States is accepted as the most suitable design of the public procurement system, often justifi ed by greater economic effi ciency and by the possibility of boosting the development of small and medium-sized enterprises, which act on the public procurement market as providers of goods, services and works. Despite the existence of highly decentralized public procurement systems which refl ect the decentralization of administrative systems, especially after the recession, there is a stronger tendency for centralization of public procurement in the EU. The so-called aggregation of demand by contracting authorities can be done in order to achieve economies of scale, including lower prices and transaction costs as well as to improve and professionalize the management of procurement procedures (as highlighted in the Directive 2014/24/EU by the European Parliament and the EU Council. However, even in the context of public procurement centralization, local contracting authorities (i.e., public administration authorities and organizations in Member States should be provided with a suffi ciently wide range of possible (centralized organizational structures and contractual (vertical and horizontal public-public partnerships which will allow them to select the most suitable and most economically effective organizational structure for the execution of public procurement.

  14. Applying e-procurement system in the healthcare: the EPOS paradigm

    Science.gov (United States)

    Ketikidis, Panayiotis H.; Kontogeorgis, Apostolos; Stalidis, George; Kaggelides, Kostis

    2010-03-01

    One of the goals of procurement is to establish a competitive price, while e-procurement utilises electronic commerce to identify potential sources of supply, to purchase goods and services, to exchange contractual information and to interact with suppliers. Extensive academic work has been extensively devoted to e-procurement in diverse industries. However, applying e-procurement in the healthcare sector remains unexplored. It lacks an efficient e-procurement mechanism that will enable hospitals and healthcare suppliers to electronically exchange contractual information, aided by the technologies of optimisation and business rules. The development and deployment of e-procurement requires a major effort in the coordination of complex interorganisational business process. This article presents an e-procurement optimised system (EPOS) for the healthcare marketplace, a complete methodological approach for deploying and operating such system, as piloted in public and private hospitals in three European countries (Greece, Spain and Belgium) and suppliers of healthcare items in the fourth country (Italy). The efficient e-procurement mechanism that EPOS suggests enables hospitals and pharmaceutical and medical equipment suppliers to electronically exchange contractual information.

  15. 49 CFR 19.46 - Procurement records.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Procurement records. 19.46 Section 19.46 Transportation Office of the Secretary of Transportation UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND... Requirements Procurement Standards § 19.46 Procurement records. Procurement records and files for purchases in...

  16. 7 CFR 2902.4 - Procurement programs.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Procurement programs. 2902.4 Section 2902.4..., DEPARTMENT OF AGRICULTURE GUIDELINES FOR DESIGNATING BIOBASED PRODUCTS FOR FEDERAL PROCUREMENT General § 2902.4 Procurement programs. (a) Integration into the Federal procurement framework. The Office of...

  17. Challenges in public procurement : an international perspective

    NARCIS (Netherlands)

    Thai, K.V.; Araujo, A.; Carter, R.Y.; Callender, G.; Telgen, Jan

    2005-01-01

    This collection of 20 papers from over 50 presented at the 2004 International Public Procurement Conference covers challenges in public procurement including public procurement reforms, balancing socio-economic goals, search for the perfect procurement system, public-private partnerships, public

  18. 7 CFR 3019.46 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Procurement records. 3019.46 Section 3019.46... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 3019.46 Procurement records. Procurement records and files for purchases in excess of the small...

  19. 40 CFR 30.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement records. 30.46 Section 30..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 30.46 Procurement records. Procurement records and files for purchases in excess of the small purchase threshold...

  20. 14 CFR 1260.146 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Procurement records. 1260.146 Section 1260... Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260.146 Procurement records. Procurement records and files for purchases in excess of the small purchase threshold...

  1. 45 CFR 74.46 - Procurement records.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Procurement records. 74.46 Section 74.46 Public..., AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Procurement Standards § 74.46 Procurement records. Procurement records and files for purchases in excess of the simplified acquisition threshold shall include...

  2. 32 CFR 203.13 - Procurement.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 2 2010-07-01 2010-07-01 false Procurement. 203.13 Section 203.13 National....13 Procurement. Procurements will be conducted as purchase orders in accordance with the FAR (48 CFR part 13). Under these procedures, procurements not exceeding $100,000 are reserved exclusively for...

  3. 32 CFR 32.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement records. 32.46 Section 32.46..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 32.46 Procurement records. Procurement records and files for purchases in excess of the simplified acquisition...

  4. 34 CFR 74.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Procurement records. 74.46 Section 74.46 Education Office of the Secretary, Department of Education ADMINISTRATION OF GRANTS AND AGREEMENTS WITH... Procurement Standards § 74.46 Procurement records. Procurement records and files for purchases in excess of...

  5. 7 CFR 1780.72 - Procurement methods.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following... procurement method for construction contracts. (a) Small purchase procedures. Small purchase procedures are...

  6. 38 CFR 49.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Procurement records. 49..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 49.46 Procurement records. Procurement records and files for purchases in excess of the small purchase threshold...

  7. 28 CFR 70.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Procurement records. 70.46 Section 70.46...-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 70.46 Procurement records. Procurement records and files for purchases in excess of the small purchase threshold must include the...

  8. 78 FR 5423 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-01-25

    ... FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Additions AGENCY: Committee... Procurement List. SUMMARY: The Committee is proposing to add products to the Procurement List that will be... have other severe disabilities. The following products are proposed for addition to the Procurement...

  9. 48 CFR 8.703 - Procurement list.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Procurement list. 8.703... Blind or Severely Disabled 8.703 Procurement list. The Committee maintains a Procurement List of all... Procurement List may be accessed at: http://www.abilityone.gov/index.html Questions concerning whether a...

  10. 14 CFR 1274.507 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Procurement records. 1274.507 Section 1274.507 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.507 Procurement records. Procurement records and files for...

  11. 29 CFR 95.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Procurement records. 95.46 Section 95.46 Labor Office of the... JURISDICTION OF FOREIGN GOVERNMENTS, AND INTERNATIONAL ORGANIZATIONS Post-Award Requirements Procurement Standards § 95.46 Procurement records. Procurement records and files for purchases in excess of the...

  12. 2 CFR 215.46 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Procurement records. 215.46 Section 215.46... NON-PROFIT ORGANIZATIONS (OMB CIRCULAR A-110) Post Award Requirements Procurement Standards § 215.46 Procurement records. Procurement records and files for purchases in excess of the small purchase threshold...

  13. 24 CFR 84.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Procurement records. 84.46 Section... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84.46 Procurement records. Procurement records and files for purchases in excess of the small purchase...

  14. Procurement Policy for Armored Vehicles

    National Research Council Canada - National Science Library

    Jolliffe, Richard B; Burton, Bruce A; Carros, Deborah L; Schaefer, Beth K; Truong, Linh; Palmer, Kevin A; Chun, Judy M; Smith, Jessica M; Abraham, Amanda M; Peters, Anthony R

    2007-01-01

    Congresswoman Louise M. Slaughter requested that the Inspector General (IG), DoD review the DoD procurement history for body armor and armored vehicles and determine whether officials properly followed contracting policies...

  15. PROMIS (Procurement Management Information System)

    Science.gov (United States)

    1987-01-01

    The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.

  16. Procurement engineering - the productivity factor

    International Nuclear Information System (INIS)

    Bargerstock, S.B.

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O ampersand M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment. Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O ampersand M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station

  17. Sustainable Procurement in Practice: Explaining the Degree of Sustainable Procurement from an Organisational Perspective

    NARCIS (Netherlands)

    J. Grandia (Jolien); S.M. Groeneveld (Sandra); B.S. Kuipers (Ben); A.J. Steijn (Bram)

    2013-01-01

    textabstractSustainable procurement is often used to reduce negative environmental impacts related to production and consumption. Several studies in the sustainable procurement literature have identified potential drivers of and barriers to sustainable procurement, which are often organisational in

  18. Controlling fuel costs: Procurement strategies and regulatory standards

    International Nuclear Information System (INIS)

    Einhorn, H.A.; Levi, B.I.

    1992-01-01

    Since the oil price shocks and inflation of the 1970s, regulatory authorities and utilities have devoted considerable attention to controlling energy costs while maintaining reliable service. Although much of this concern has been directed towards capital cost containment, increasing scrutiny has been applied to a broad range of variable costs, especially to fuel procurement expenditures. With some 40% to 65% of the electric utility industry's annual operation and maintenance expenses paid to secure fuel supplies, even a small difference in fuel costs could have a substantial impact on costs to ratepayers. This increased attention to fuel cost containment can be expected to intensify as implementation of the 1990 amendments to the Clean Air Act affects fuel purchase decisions. To assure that fuel is purchased in a responsible and cost-effective manner, some state jurisdictions have initiated periodic reviews (audits) of the procurement practices that electric utilities follow when purchasing fuel. While a utility must demonstrate how it purchases fuel, there is wide variation in interest and scope of audits among jurisdictions. In this paper, the authors review: (1) the regulatory environment within which fuel procurement and audits occur, and (2) some particularly controversial issues that will receive increasing attention as the practice of conducting fuel procurement audits spreads

  19. Transfer Pricing

    DEFF Research Database (Denmark)

    Rohde, Carsten; Rossing, Christian Plesner

    trade internally as the units have to decide what prices should be paid for such inter-unit transfers. One important challenge is to uncover the consequences that different transfer prices have on the willingness in the organizational units to coordinate activities and trade internally. At the same time...... the determination of transfer price will affect the size of the profit or loss in the organizational units and thus have an impact on the evaluation of managers‟ performance. In some instances the determination of transfer prices may lead to a disagreement between coordination of the organizational units...

  20. The transformation of the tender evaluation process in public procurement in Poland

    Science.gov (United States)

    Plebankiewicz, E.; Kozik, R.

    2017-10-01

    Procedures regarding the evaluation of tenders have been changed since the public procurement law was enacted (it came into force in January 1, 1995). The contracting authority could apply both the criteria related to the qualities of the contractor and those related to the to the subject - matter of public contract. Two extensive amendments in 2001 and a government project introduced vital regulations and excluded the possibility of applying criteria related to the qualities of the contractor. Act of 29 January 2004 Public Procurement Law allowed to use price as the sole contract award criterion. The changes in the Law in 2014 restricted that possibility to the situation in which the subject matter of a contract is commonly available and has established quality standards. The Act of 22 June 2016 amending the Public Procurement Law Act and some other laws introduced the new criteria list and limited the importance of the price criterion in the certain situations. Instead of price, the cost can also be a criterion for tender evaluation. The cost criterion can be determined using life cycle costing. In the paper, based on contract notices of open tendering published in the Public Procurement Bulletin, the criteria of construction contract selection will be analysed. In particular the effectiveness of changes in the Procurement Law will be researched.

  1. Petroleum price

    International Nuclear Information System (INIS)

    Chevallier, B.

    2009-01-01

    The 'AFTP' conference on 'petroleum prices' organized by Total last March, tries to explain the different aspects of the crisis we undergo for July 2007 and its consequential effects on the petroleum markets (supply, demand evolvements, impacts on reserves, prices, refining...). (O.M.)

  2. Energies prices

    International Nuclear Information System (INIS)

    2005-08-01

    This document offers a synthesis of the tariffs and the energies prices in august 2005 in Paris, compared with the years 2003 and 2004. This sectoral presentation (transports, houses, industry) provides thus statistics on the prices of fuels, heating, propane, coal, wood fuels, electric power and gas. (A.L.B.)

  3. Transfer Pricing

    DEFF Research Database (Denmark)

    Rohde, Carsten; Rossing, Christian Plesner

    trade internally as the units have to decide what prices should be paid for such inter-unit transfers. One important challenge is to uncover the consequences that different transfer prices have on the willingness in the organizational units to coordinate activities and trade internally. At the same time...

  4. Analisis dan Perancangan Aplikasi Berbasis Web E-Procurement di PT Pillar Utama Contrindo

    Directory of Open Access Journals (Sweden)

    Sartika Kurniali

    2012-12-01

    Full Text Available The aim of this research is to analyze the current business process at the procurement department at PT Pillar Utama Contrindo as well as develop a web based e-procurement application prototype to supportprocurement process at the company. Interview, survey, as well as analysis and design to develop the prototype are used in the research. The research results in an e-procurement application prototype built to minimize errors on related document filling, help the company to get best price on their supply, and increase control. It can be concluded from the research that the protoype can be implemented to be a tool for the users to decide the best supplier, obtain the best price, and increase control in buying process at PT Pillar Utama Contrindo.

  5. Transfer Pricing

    DEFF Research Database (Denmark)

    Nielsen, Søren Bo

    2014-01-01

    Against a background of rather mixed evidence about transfer pricing practices in multinational enterprises (MNEs) and varying attitudes on the part of tax authorities, this paper explores how multiple aims in transfer pricing can be pursued across four different transfer pricing regimes. A MNE has...... a production subsidiary in one country, from where it sells the produced good locally as well as to a sales subsidiary in a second country. The latter subsidiary is engaged in duopolistic competition with a local competitor. The MNE has two aims in setting the transfer price: strategic delegation and tax...... minimization. We examine the extent to which the four transfer pricing regimes we set up allow the MNE to pursue these aims. While neither strategic delegation nor tax minimization will be eliminated, trade-offs are inevitable, albeit to varying degree....

  6. Transfer Pricing

    DEFF Research Database (Denmark)

    Nielsen, Søren Bo

    2014-01-01

    a production subsidiary in one country, from where it sells the produced good locally as well as to a sales subsidiary in a second country. The latter subsidiary is engaged in duopolistic competition with a local competitor. The MNE has two aims in setting the transfer price: strategic delegation and tax......Against a background of rather mixed evidence about transfer pricing practices in multinational enterprises (MNEs) and varying attitudes on the part of tax authorities, this paper explores how multiple aims in transfer pricing can be pursued across four different transfer pricing regimes. A MNE has...... minimization. We examine the extent to which the four transfer pricing regimes we set up allow the MNE to pursue these aims. While neither strategic delegation nor tax minimization will be eliminated, trade-offs are inevitable, albeit to varying degree....

  7. The discovery and development of antiretroviral agents.

    Science.gov (United States)

    Lange, Joep M A; Ananworanich, Jintanat

    2014-01-01

    Since the discovery of HIV as the causative agent of AIDS in 1983/1984, remarkable progress has been made in finding antiretroviral drugs (ARVs) that are effective against it. A major breakthrough occurred in 1996 when it was found that triple drug therapy (HAART) could durably suppress viral replication to minimal levels. It was then widely felt, however, that HAART was too expensive and complex for low- and middle-income countries, and so, with the exception of a few of these countries, such as Brazil, a massive scale-up did not begin until the WHO launched its '3 by 5' initiative and sizeable funding mechanisms, such as the Global Fund to Fight AIDS, TB and Malaria and the US President's Emergency Plan for AIDS Relief (PEPFAR), came into existence. A pivotal enabler of the scale-up was a steady lowering of drug prices through entry of generic antiretrovirals, competition between generic manufacturers and the making of volume commitments. The WHO Prequalification of Medicines Programme and the Expedited Review Provision of the US Food and Drug Administration have been important for the assurance of quality standards. Antiretroviral drug development by research-based pharmaceutical companies continues, with several important innovative products, such as long-acting agents, in the pipeline.

  8. Framework agreements in public procurement

    DEFF Research Database (Denmark)

    Andrecka, Marta; Telles, Pedro

    2015-01-01

    Interview with Dr. Marta Andrecka, Postdoctoral Fellow at the Department of Law at the University of Aarhus, where she is currently working on a project called "Dealing with legal loopholes and uncertainties within EU public procurement law regarding framework agreements" sponsored by the Carlsberg...... Foundation. Before taking up her present position she carried out her doctoral research in Denmark and Australia and worked at law offices in both Poland and the UK. The topic for today’s talk is framework agreements, a relatively popular way of undertaking public procurement...

  9. URGENSI STUDI TENTANG PROCUREMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Yohanes Sogar Simamora

    2006-01-01

    Full Text Available Contractualization is kind of goverment activity in acquiring goods, services and infrastructure as well. Procurement contract has several important function especially in enhancing economic development in a state. In Indonesia, this kind of contract also has function in empowering micro economic scale. Since the aim of procurement study is to provide equal protection between public fund interest in one hand and privat sector in the other hand, general principle of contract law must be taken into consideration together with transparency as the most important principle in government contract.

  10. Gas prices and price process

    International Nuclear Information System (INIS)

    Groenewegen, G.G.

    1992-01-01

    On a conference (Gas for Europe in the 1990's) during the Gasexpo '91 the author held a speech of which the Dutch text is presented here. Attention is paid to the current European pricing methods (prices based on the costs of buying, transporting and distributing the natural gas and prices based on the market value, which is deducted from the prices of alternative fuels), and the transparency of the prices (lack of information on the way the prices are determined). Also attention is paid to the market signal transparency and gas-gas competition, which means a more or less free market of gas distribution. The risks of gas-to-gas competition for a long term price stability, investment policies and security of supply are discussed. Opposition against the Third Party Access (TPA), which is the program to implement gas-to-gas competition, is caused by the fear of natural gas companies for lower gas prices and lower profits. Finally attention is paid to government regulation and the activities of the European Commission (EC) in this matter. 1 fig., 6 ills., 1 tab

  11. Price increase

    CERN Multimedia

    2006-01-01

    Please take note that after five years of stable prices at Restaurant No 1 a price increase will come into force on 1st January 2006. This increase has been agreed after discussions between the CSR (Comité de Surveillance des Restaurants) and the catering company Novae and will reflect the inflation rate of the last few years. In addition, a new children's menu will be introduced, as well as 'Max Havelaar' fair-trade coffee at a price of 1.70 CHF.

  12. Price increase

    CERN Multimedia

    2005-01-01

    Please take note that after five years of stable prices at Restaurant No 1 a price increase will come into force on 1st January 2006. This increase has been agreed after discussions between the CSR (Comité de Surveillance des Restaurants) and the catering company Novae and will reflect the inflation rate of the last few years. In addition, a new children's menu will be introduced as well as 'Max Havelaar' fair-trade coffee at a price of 1.70 CHF.

  13. The (political) economics of antiretroviral treatment in developing countries.

    Science.gov (United States)

    Nattrass, Nicoli J

    2008-12-01

    Despite unprecedented international mobilisation to support universal provision of highly active antiretroviral therapy (HAART), national governments continue to play the key role in determining access to treatment. Whereas some AIDS-affected countries have performed as well as or better than expected given their level of development, institutional characteristics and demographic challenges (e.g. Thailand and Brazil), others (notably South Africa) have not. This article argues that the 'economics' of antiretroviral drug delivery is at heart a political-economy of access to treatment. It depends on commitment on the part of national governments to negotiate with pharmaceutical companies over patented antiretroviral drug prices, on their policy towards compulsory licensing, and on the approach they adopt to delivering HAART. Civil society has an important role to play in encouraging governments to become, and remain, committed to taking action to ensure sustainable and widespread access to HAART.

  14. Public Procurement of Innovation as Endogenous

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Public procurement used as an innovation policy instrument has attracted attention the last decade. It has been argued that public procurement can be used to stimulate innovation from the demand-side. This paper problematizes ‘demand’ understood as a problem defined by a public procurer given to ...... underlying mechanisms critical for success. Instead the paper views public procurement of innovation as an instrument of endogenous- exogenous knowledge conversion....

  15. [Characteristics of antiretroviral drugs].

    Science.gov (United States)

    Ribera, Esteban; Tuset, Montse; Martín, Maite; del Cacho, Elena

    2011-05-01

    As of November 2010, a total of 22 antiretroviral agents are marketed in Spain. These agents are divided into 6 classes according to their mechanism of action: 1) nucleos(t)ide reverse transcriptase inhibitors (NRTI) (abacavir, didanosine, emtricitabine, stavudine, lamivudine, zidovudine, and tenofovir), 2) non-nucleoside reverse transcriptase inhibitors (NNRTI) (efavirenz, etravirine, and nevirapine), 3) protease inhibitors (PI) (atazanavir, darunavir, fosamprenavir, indinavir, lopinavir, nelfinavir, ritonavir, saquinavir, tipranavir), 4) entry inhibitors (enfuvirtide), 5) coreceptor CCR5 inhibitors (maraviroc), and 6) integrase inhibitors (raltegravir). All 22 agents are indicated for the treatment of HIV-1 infection in combination with other antiretroviral drugs. Most have also proven to be active against HIV-2 (except the NNRTIs, enfuvirtide, and maraviroc) and some are active against hepatitis B virus (lamivudine, emtricitabine, and tenofovir). The present article reviews the main characteristics of the different antiretroviral agents and classes, namely, commercial presentations, paediatric and adult dosages, dose adjustments in renal and hepatic insufficiency, pharmacokinetics and interactions, mechanism of action, treatment indications, resistance, adverse effects, and safety during pregnancy and breastfeeding. Some of the characteristics of antiretrovirals are class-specific and common to other agents of the same class, and others are individual and different from those of other drugs in the same class. Knowledge of these characteristics enables us to prepare efficacious therapeutic regimens according to the specific requirements of the patient (tolerability, simplicity, adaptability to lifestyle) and clinical setting (naive, simplification, rescue, resistance). Copyright © 2010 Elsevier España, S.L. All rights reserved.

  16. INITIATING ANTIRETROVIRAL THERAPY

    African Journals Online (AJOL)

    annaline

    2005-09-02

    Sep 2, 2005 ... than if they had started ART immediately', because most patients will eventually fail therapy. Therefore I do ... deal with those who are suffering most. REFERENCES. 1. Cole S, Li R, Anastos K, Detels ... Antiretroviral therapy (ART) programmes are a part of the response to the massive mortality occurring in ...

  17. Freemium Pricing

    DEFF Research Database (Denmark)

    Runge, Julian; Wagner, Stefan; Claussen, Jörg

    Firms commonly run field experiments to improve their freemium pricing schemes. However, they often lack a framework for analysis that goes beyond directly measurable outcomes and focuses on longer term profit. We aim to fill this gap by structuring existing knowledge on freemium pricing...... into a stylized framework. We apply the proposed framework in the analysis of a field experiment that contrasts three variations of a freemium pricing scheme and comprises about 300,000 users of a software application. Our findings indicate that a reduction of free product features increases conversion as well...... as viral activity, but reduces usage – which is in line with the framework’s predictions. Additional back-of-the-envelope profit estimations suggest that managers were overly optimistic about positive externalities from usage and viral activity in their choice of pricing scheme, leading them to give too...

  18. 10 CFR 21.31 - Procurement documents.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Procurement documents. 21.31 Section 21.31 Energy NUCLEAR REGULATORY COMMISSION REPORTING OF DEFECTS AND NONCOMPLIANCE Procurement Documents § 21.31 Procurement documents. Each individual, corporation, partnership, dedicating entity, or other entity subject to the...

  19. 7 CFR 210.21 - Procurement.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement. 210.21 Section 210.21 Agriculture... Responsibilities § 210.21 Procurement. (a) General. State agencies and school food authorities shall comply with... the applicable Office of Management and Budget Circulars, concerning the procurement of all goods and...

  20. 77 FR 55195 - Procurement List; Additions

    Science.gov (United States)

    2012-09-07

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to the Procurement List. SUMMARY: This action adds services to the Procurement List that will be provided by nonprofit agencies employing...

  1. 75 FR 21246 - Procurement List; Addition

    Science.gov (United States)

    2010-04-23

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Addition AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Addition to the Procurement List. SUMMARY: This action adds to the Procurement List products to be furnished by a nonprofit agency employing persons who are...

  2. 75 FR 2510 - Procurement List: Proposed Additions

    Science.gov (United States)

    2010-01-15

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List: Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed Additions to Procurement List. SUMMARY: The Committee is proposing to add to the Procurement List services to be provided by nonprofit...

  3. 40 CFR 35.935-2 - Procurement.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement. 35.935-2 Section 35.935-2... ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-2 Procurement. The grantee and... respect to procurement for step 1, 2, or 3 work. The Regional Administrator will cause appropriate review...

  4. 45 CFR 2543.46 - Procurement records.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Procurement records. 2543.46 Section 2543.46 Public Welfare Regulations Relating to Public Welfare (Continued) CORPORATION FOR NATIONAL AND COMMUNITY... ORGANIZATIONS Post-Award Requirements Property Standards § 2543.46 Procurement records. Procurement records and...

  5. 77 FR 34025 - Procurement List; Addition

    Science.gov (United States)

    2012-06-08

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Addition AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Addition to the Procurement List. SUMMARY: This action adds a service to the Procurement List that will be provided by the nonprofit agency employing persons...

  6. 40 CFR 35.936 - Procurement.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement. 35.936 Section 35.936... ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.936 Procurement. (a) Sections 35.936 through 35.939 set forth policies and minimum standards for procurement of architectural or...

  7. 43 CFR 12.946 - Procurement records.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Procurement records. 12.946 Section 12.946 Public Lands: Interior Office of the Secretary of the Interior ADMINISTRATIVE AND AUDIT REQUIREMENTS AND... Requirements § 12.946 Procurement records. Procurement records and files for purchases in excess of the small...

  8. 78 FR 7412 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-02-01

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed Additions to the Procurement List. SUMMARY: The Committee is proposing to add products to the Procurement List that will be furnished by the...

  9. 78 FR 34351 - Procurement List; Additions

    Science.gov (United States)

    2013-06-07

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions AGENCY: Committee for Purchase from People Who are Blind or Severely Disabled. ACTION: Additions to the Procurement List. SUMMARY: This action adds services to the Procurement List that will be provided by nonprofit agencies employing...

  10. 78 FR 9386 - Procurement List; Addition

    Science.gov (United States)

    2013-02-08

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Addition AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Addition to the Procurement List. SUMMARY: This action adds a service to the Procurement List that will be provided by a nonprofit agency employing persons...

  11. 40 CFR 35.925-20 - Procurement.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement. 35.925-20 Section 35.925... Procurement. That the applicant has complied or will comply with the applicable provisions of §§ 35.935 through 35.939 with respect to procurement actions taken before the award of step 1, 2, or 3 grant...

  12. 78 FR 5423 - Procurement List; Additions

    Science.gov (United States)

    2013-01-25

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to the Procurement List. SUMMARY: This action adds products to the Procurement List that will be furnished by the nonprofit agency employing...

  13. 75 FR 6869 - Procurement List; Additions

    Science.gov (United States)

    2010-02-12

    ...; ] COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to the Procurement List. SUMMARY: This action adds to the Procurement List products and a service to be furnished by...

  14. 50 CFR 82.17 - Procurement.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Procurement. 82.17 Section 82.17 Wildlife... (MARINE MAMMAL PROTECTION ACT OF 1972) Administration § 82.17 Procurement. Grantees may use their own procurement regulations which reflect applicable State and local laws, rules, and regulations, provided that...

  15. 76 FR 9555 - Procurement List; Proposed Deletions

    Science.gov (United States)

    2011-02-18

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Deletions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed deletions from the Procurement...'Day Act (41 U.S.C. 46- 48c) in connection with the products proposed for deletion from the Procurement...

  16. 77 FR 2048 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-01-13

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed Additions to the Procurement List. SUMMARY: The Committee is proposing to add services to the Procurement List that will be provided by the...

  17. 77 FR 62220 - Procurement List; Additions

    Science.gov (United States)

    2012-10-12

    ... Procurement List; Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to the Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be furnished by nonprofit agencies employing persons who are blind or have other...

  18. 78 FR 59658 - Procurement List; Additions

    Science.gov (United States)

    2013-09-27

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to the Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be furnished by nonprofit agencies...

  19. 77 FR 77037 - Procurement List; Additions

    Science.gov (United States)

    2012-12-31

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to the Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be furnished by nonprofit agencies...

  20. 75 FR 2510 - Procurement List; Corrections

    Science.gov (United States)

    2010-01-15

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Corrections AGENCY: Committee for Purchase... published by the Committee in proposing to add to and delete from the Procurement List a product and... adding services to and deleting from the Procurement List products and services on January 11, 2010 (75...

  1. 7 CFR 3565.257 - Procurement actions.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...

  2. 77 FR 53180 - Procurement List; Additions

    Science.gov (United States)

    2012-08-31

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions AGENCY: Committee for Purchase from People who are Blind or Severely Disabled. ACTION: Additions to the Procurement List. SUMMARY: This action adds services to the Procurement List that will be provided by nonprofit agencies employing...

  3. 78 FR 56679 - Procurement List; Deletions

    Science.gov (United States)

    2013-09-13

    ... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Deletions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Deletions from the Procurement List. SUMMARY: This action deletes products from the Procurement List previously furnished by nonprofit agencies employing...

  4. 49 CFR 110.80 - Procurement.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Procurement. 110.80 Section 110.80 Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION... TRAINING AND PLANNING GRANTS § 110.80 Procurement. Project managers shall use procurement procedures and...

  5. 10 CFR 436.43 - Procurement planning.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...

  6. 76 FR 26279 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-05-06

    ...-service area; clean and sanitize food service equipment, utensil cleaning, and dishwashing; clean pots... additions to the Procurement List. SUMMARY: The Committee is proposing to add services to the Procurement... in this notice will be required to procure the services listed below from nonprofit agencies...

  7. Petroleum price

    International Nuclear Information System (INIS)

    Maurice, J.

    2001-01-01

    The oil market is the most volatile of all markets, with the exception of the Nasdaq. It is also the biggest commodity market in the world. Therefore one cannot avoid forecasting oil prices, nor can one expect to avoid the forecasting errors that have been made in the past. In his report, Joel Maurice draws a distinction between the short term and the medium-long term in analysing the outlook for oil prices. (author)

  8. Prices, availability and affordability of essential medicines in rural areas of Hubei Province, China.

    Science.gov (United States)

    Yang, Hao; Dib, Hassan H; Zhu, Minmin; Qi, Gang; Zhang, Xinping

    2010-05-01

    To investigate the availability of essential medicines and their prices in Hubei province. The survey assessed the prices and availability of essential medicines using the World Health Organization and Health Action International methodology. Data were collected from 18 public hospitals and 18 private pharmacies. At each facility the availability and prices of 39 innovator brand medicines and lowest-price generic equivalent medicines were collected. Medicine prices were compared with international reference prices to obtain a median price ratio (MPR). Daily incomes of low and average levels were used to assess the affordability of the medicines. Median availability in the public and private sectors was low (38.9% and 44.4% for lowest-price generics, respectively). The median MPRs of procurement prices for innovator brands and lowest-price generics in the public sector were 9.78 and 0.74 times the international reference prices; and the median MPRs of retail prices to patients for lowest-price generics in the public sector (1.04) were higher than those in the private sector (0.68). For most of the population, the medicine prices are affordable, but for those of low income they are not. The survey revealed low procurement prices but poor availability in the public sector. Various policy adjustments could increase the availability of essential medicines and reduce their prices for the low income population.

  9. Intervening in global markets to improve access to HIV/AIDS treatment: an analysis of international policies and the dynamics of global antiretroviral medicines markets.

    Science.gov (United States)

    Waning, Brenda; Kyle, Margaret; Diedrichsen, Ellen; Soucy, Lyne; Hochstadt, Jenny; Bärnighausen, Till; Moon, Suerie

    2010-05-25

    Universal access to antiretroviral therapy (ART) in low- and middle-income countries faces numerous challenges: increasing numbers of people needing ART, new guidelines recommending more expensive antiretroviral (ARV) medicines, limited financing, and few fixed-dose combination (FDC) products. Global initiatives aim to promote efficient global ARV markets, yet little is known about market dynamics and the impact of global policy interventions. We utilize several data sources, including 12,958 donor-funded, adult first-line ARV purchase transactions, to describe the market from 2002-2008. We examine relationships between market trends and: World Health Organization (WHO) HIV/AIDS treatment guidelines; WHO Prequalification Programme (WHO Prequal) and United States (US) Food and Drug Administration (FDA) approvals; and procurement policies of the Global Fund to Fight AIDS, Tuberculosis, and Malaria (GFATM), US President's Emergency Plan for AIDS Relief (PEPFAR) and UNITAID. WHO recommended 7, 4, 24, and 6 first-line regimens in 2002, 2003, 2006 and 2009 guidelines, respectively. 2009 guidelines replaced a stavudine-based regimen ($88/person/year) with more expensive zidovudine- ($154-260/person/year) or tenofovir-based ($244-465/person/year) regimens. Purchase volumes for ARVs newly-recommended in 2006 (emtricitabine, tenofovir) increased >15-fold from 2006 to 2008. Twenty-four generic FDCs were quality-approved for older regimens but only four for newer regimens. Generic FDCs were available to GFATM recipients in 2004 but to PEPFAR recipients only after FDA approval in 2006. Price trends for single-component generic medicines mirrored generic FDC prices. Two large-scale purchasers, PEPFAR and UNITAID, together accounted for 53%, 84%, and 77% of market volume for abacavir, emtricitabine, and tenofovir, respectively, in 2008. PEPFAR and UNITAID purchases were often split across two manufacturers. Global initiatives facilitated the creation of fairly efficient markets

  10. Intervening in global markets to improve access to HIV/AIDS treatment: an analysis of international policies and the dynamics of global antiretroviral medicines markets

    Directory of Open Access Journals (Sweden)

    Hochstadt Jenny

    2010-05-01

    Full Text Available Abstract Background Universal access to antiretroviral therapy (ART in low- and middle-income countries faces numerous challenges: increasing numbers of people needing ART, new guidelines recommending more expensive antiretroviral (ARV medicines, limited financing, and few fixed-dose combination (FDC products. Global initiatives aim to promote efficient global ARV markets, yet little is known about market dynamics and the impact of global policy interventions. Methods We utilize several data sources, including 12,958 donor-funded, adult first-line ARV purchase transactions, to describe the market from 2002-2008. We examine relationships between market trends and: World Health Organization (WHO HIV/AIDS treatment guidelines; WHO Prequalification Programme (WHO Prequal and United States (US Food and Drug Administration (FDA approvals; and procurement policies of the Global Fund to Fight AIDS, Tuberculosis, and Malaria (GFATM, US President's Emergency Plan for AIDS Relief (PEPFAR and UNITAID. Results WHO recommended 7, 4, 24, and 6 first-line regimens in 2002, 2003, 2006 and 2009 guidelines, respectively. 2009 guidelines replaced a stavudine-based regimen ($88/person/year with more expensive zidovudine- ($154-260/person/year or tenofovir-based ($244-465/person/year regimens. Purchase volumes for ARVs newly-recommended in 2006 (emtricitabine, tenofovir increased >15-fold from 2006 to 2008. Twenty-four generic FDCs were quality-approved for older regimens but only four for newer regimens. Generic FDCs were available to GFATM recipients in 2004 but to PEPFAR recipients only after FDA approval in 2006. Price trends for single-component generic medicines mirrored generic FDC prices. Two large-scale purchasers, PEPFAR and UNITAID, together accounted for 53%, 84%, and 77% of market volume for abacavir, emtricitabine, and tenofovir, respectively, in 2008. PEPFAR and UNITAID purchases were often split across two manufacturers. Conclusions Global initiatives

  11. Multi-market energy procurement for a large consumer using a risk-aversion procedure

    Energy Technology Data Exchange (ETDEWEB)

    Zare, Kazem [Tarbiat Modares University, Tehran, P.O. Box 14115-111 (Iran); Conejo, Antonio J. [Castilla-La Mancha University, Ciudad Real (Spain); Carrion, Miguel [Castilla-La Mancha University, Toledo (Spain); Moghaddam, Mohsen Parsa [Tarbiat Modares University, Tehran (Iran)

    2010-01-15

    This paper provides a technique to derive the bidding strategy in the day-ahead market of a large consumer that procures its electricity demand in both the day-ahead market and a subsequent adjustment market. Price uncertainty is modeled using concepts derived from information gap decision theory, which allows deriving robust decisions with respect to price volatility. Risk aversion is built implicitly within the proposed model. Correlations among prices in the day-ahead and the adjustment markets are properly modeled. The proposed technique is illustrated through a realistic case study. (author)

  12. Public Procurement of Innovation in Sweden

    DEFF Research Database (Denmark)

    Rolfstam, Max; Ågren, Robert

    2014-01-01

    of public procurement Sweden dropped many policy initiatives within this field. This was in part due to neo-liberal movements during the 1980s which in interaction with a distributed institutional setup led to the removal of incentives for a procuring authority to engage in public procurement of innovation....... Another contributing cause was poor policy guidance from the academia upon Sweden’s accession into the EU, which spread apprehension among procuring authorities. It is not until the last few years that Sweden has started to reengage in public procurement for innovation policy, by using predominantly...

  13. Greening Non-Product-Related Procurement

    DEFF Research Database (Denmark)

    Mosgaard, Mette; Riisgaard, Henrik; Huulgaard, Rikke Dorothea

    2013-01-01

    -related procurement. Taking a network approach focusing on resources, actors and activities, three ways of utilising the drivers of non-product-related procurement are suggested: 1) Increase the focus on the extremely concentrated procurement markets such as the on-line catalogues of wholesalers; 2) Create a closer......Green procurement in Denmark is developing with a new strategy with special emphasis on non-product-related procurement; i.e., all products that are not directly transformed into the product produced by the company, for example cleaning detergents and office supplies. Three earlier strategies...... are well described in literature: Green supply chain management in the business-to-business area, green public procurement, and, finally green private consumption. The latest strategy with special emphasis on non-product-related procurement makes sense from a macro-level perspective: the small...

  14. Pro short-term procurement - Broker/trader

    International Nuclear Information System (INIS)

    Hoellen, E.E.

    1990-01-01

    The author presents his opinion on the issue of short-term versus long-term procurement of uranium and enrichment and the impact on reliability of supply. The progression of the market has been one of increasing commoditization. Utility buyers have moved towards purchasing uranium on the spot market and linking long-term contracts to spot-market pricing. There is some logic to the argument that utilities and the industry in general would be best served by this approach. Inventories would be worked off much more quickly, and unnecessary supply would be shut off until prices recovered to profitable levels. The result would be a healthier market with no detriment to the reliability of supply

  15. Marketplace pricing

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    As discussed in this chapter, interest in marketplace pricing has been increasing in recent years, reflecting the societal trend toward substituting competition for regulation where appropriate. Competition is valuable because it encourages utilities to make efficient decisions with a minimum of regulatory intervention. It enhances efficiency through the incentive for innovation by the regulated companies and by increasing the likelihood they will come forward with proposals for better services, lower prices or both. Ultimately, consumers are beneficiaries. Marketplace pricing is emblematic of the view that the degree of regulation should reflect the degree of market power, that workably competitive markets should be allowed to operate with as little regulatory interference as possible. The Edison Electric Institute has made perhaps the most detailed proposal on marketplace pricing. It and others perceive numerous benefits from this method of pricing transmission services. Given the undeniable market power resulting from line ownership, FERC has emphasized the need to find a workably competitive market before approving such proposals. The ability to make this distinction without a full-blown antitrust review for every transaction is questionable, and FERC has yet to provide generic guidance. Finally, FERC's legal ability to depart from cost-based standards is questionable

  16. USING E-CATALOG SYSTEM TO REDUCE COST IN PROCUREMENT OF DRUGS

    Directory of Open Access Journals (Sweden)

    Hery Suliantoro

    2016-06-01

    Full Text Available The price of drugs in Indonesia is still relatively expensive in both the government and private sectors. A survey conducted in 2004 showed that the price of patented drugs in Indonesia is 22 to 26 times higher than the International Reference Price (IRP. As for generic drugs, though cheaper than patented drugs, the price is still nine times higher than the IRP. To overcome these problems, the government facilitated the procurement of generic drugs by using the e-Catalog. But not all hospitals can purchases drugs through the e-Catalog, some still use the conventional methods to supply the needs of medicine where the prices are more expensive than the prices of the e-Catalog. The case studies carry out in one of private hospital, and selection of items examined using Kraljic Portfolio Matrix. After doing research, the selected item that is on strategic items is Omeprazole. The price difference is due to different contract system. In the conventional way, the contract made between the Hospital and the main distributor. While,  the e-Catalog way, contracts made directly to the pharmaceutical factory through the framework contract with government (LKPP. In the future, the conventional way must be abandoned, because through the e-Catalog, procurement is more efficient, thereby reducing time and costs.

  17. Selection of procurement systems in the South African construction industry: An exploratory study

    Directory of Open Access Journals (Sweden)

    W. D. Thwala

    2012-12-01

    Full Text Available Purpose of this paper: Procurement systems are vital in ensuring the successful implementation of construction projects precisely in all the phases of any particular project. Therefore, this paper aims to investigate in a systematic manner the factors that influence the selection of a procurement system in the South African construction industry. Research methodology: An extensive theory and literature review of procurement systems was conducted. The literature reviewed included a sample of case studies of procurement systems successfully implemented in completed building and civil engineering projects in South Africa. A questionnaire using a four-round Delphi survey method was used to conduct the empirical study in order to obtain participants' opinions about factors influencing the selection of procurement systems as well as the utility value of various procurement systems on each factor as identified. Finally, data analysis of both qualitative and quantitative techniques was performed using the Statistical Package for Social Sciences (SPSS. Findings: After qualitative analysis, findings of the literature reviewed suggest that factors that influence the selection of procurement systems cut across all the phases of the project as identified in this paper. Therefore, these factors are categorically classified into internal and external factors. Factors from the internal environment were further classified into client characteristics and project characteristics, with client characteristics comprising of variables such as clients' level of knowledge and control, political and social consideration, familiarity of procurement systems, competition, funding arrangement, government public/private sector projects and risk allocation whereas project characteristics comprise of factors (variables such as size and technical complexity of the project, influence of the project life cycle, expedited project delivery, time, quality and price certainty. Factors

  18. Electricity pricing

    International Nuclear Information System (INIS)

    Wijayatunga, P.D.C.

    1994-01-01

    Electricity pricing in most countries, especially in the developing world, has been determined by traditional accounting criteria where it raises revenue requirements to cover the operating costs and a return on past and future capital investments in possible power systems. The use of economic principles to improve the total economic efficiency in the electricity industry is discussed. Basic marginal cost theory, long run marginal costing (LRMC) cost categories and rating periods, marginal capacity costs, marginal energy costs, consumer costs, short run marginal costing (SRMC), marginal cost of fuel, marginal cost of network losses, market clearing price, value of unserved energy and network quality of supply cost are discussed

  19. Analysis of the Impact of Transparency, Corruption, Openness in Competition and Tender Procedures on Public Procurement in the Czech Republic

    Directory of Open Access Journals (Sweden)

    František Ochrana

    2014-01-01

    Full Text Available This study analyses the impact of transparency and openness to competition in public procurement in the Czech Republic. The problems of the Czech procurement market have been demonstrated on the analysis of a sample of contracts awarded by local government entities. From among a set of factors influencing the efficiency of public procurement, we closely analyse transparency, resilience against corruption, openness, effective administrative award procedure, and formulation of appropriate evaluation criteria for selecting the most suitable bid. Some assumptions were confirmed, including a positive effect of open procedures on the level of competition on the supply side as well as the dominant use of price criteria only. The latter case is probably often caused by low skills of workers at the contracting entities, as well as the lack of resources in public budgets. However, we have to reject the persistent legend of “undershooting” tender prices and subsequently increasing the final prices of public contracts. Increases of final prices are very limited. Based on the results of the analyses presented, we argue that the main problem of the Czech public procurement market lies in a rather low competence of administrators who are not able to use non-price criteria more often.

  20. PROCUREMENT IN THE SUPPLY CHAIN: AN ELEMENT OF HOTEL PRODUCT COMPETITIVENESS

    Directory of Open Access Journals (Sweden)

    Edna Mrnjavac

    2016-12-01

    organization is essential for the application of the supply-chain principles, but it can also have the opposite effect. The principles of supply chain organization and management are present in all investigated hotels, but to varying degrees. While obtaining the lowest price is singled out as the primary goal of procurement, the need to take into account other elements, such as the quality of procurement, products and services, is also emphasized because this makes it possible to create a hotel product that guests will be satisfied with. Conclusion: The presence of supply-chain elements in hotel procurement correlates with the size of the hotel enterprise, but not with the type of hotel or its location (type of tourist destination. The organizational basis of stand-alone hotels is better suited for the development of supply chains. Their less-formal business organization and decentralized procurement provide a suitable environment for focusing on and effectively managing the business process to enhance product quality. In contrast, centralized procurement embedded in the more rigid organization of hotel enterprises contains a number of barriers that go against the supply chain concept. Partly for this reason, the primary goal of hotel enterprises is price, while quality is only a secondary goal. Networked supply-chain structures are present in both cases, and high on the list of procurement goals is the importance of building sound relationships with prominent suppliers. Also important is that procurement organized in this way focuses on the long term; the supplier market and procurement terms are analyzed periodically and, if necessary, changes are made regarding suppliers and supplier relationships.

  1. Energy prices

    International Nuclear Information System (INIS)

    2002-08-01

    This document gives in a series of tables, a synthesis of the main energy tariffs and prices in use in France and their evolution during the 2000-2002 era both in the residential and in the industry sectors: automotive fuels, domestic fuel oil, steam for district heating, propane, coal, wood, electricity, gas, heavy fuel oil. (J.S.)

  2. Energy prices

    International Nuclear Information System (INIS)

    2002-01-01

    This folder gives a synthesis of the main energy tariffs and prices ruling in France in 2000, 2001 and 2002 for automotive fuels, domestic fuel oil, district heating steam, propane, coal, wood, electricity, natural gas and heavy fuel, both for accommodations and for the industry. (J.S.)

  3. Effects of procurement practices on quality of medical device or service received: a qualitative study comparing countries.

    Science.gov (United States)

    Lingg, Myriam; Wyss, Kaspar; Durán-Arenas, Luis

    2016-08-08

    We know little about how procurement of a high-risk medical device (HRMD) affects clinical practice and outcomes. In health systems in high-income countries, and specifically those that maintain a national arthroplasty registry, procurement decisions are frequently guided by long-term clinical results, with the goal of ensuring at least standard quality of HRMDs. But in countries like Mexico, decision-making is often dominated by lowest acquisition price. We set out to study the impact of procurement for orthopaedic HRMDs on clinical procedures and outcomes. We based our qualitative study on 59 in-depth interviews with stakeholders from Mexico, Switzerland, Germany, and UK: orthopaedic specialists, government officials, other experts, and social security system managers or administrators. We took a healthcare delivery approach to capturing and comparing factors that affected the regulations of HRMDs and procurement processes, and to understanding connections between procurement and clinical practice. Our findings demonstrate for procurement processes that the three European countries compared to Mexico don't have similar concerns with regards to their procurement processes. Deficiencies of procurement regulations and practices identified from representatives in Mexico were almost absent in European countries. We identified three areas of deficiency: 1) HRMD regulations based on insufficiently robust clinical evidence (mainly noted by European countries); 2) Follow-up on Health Technology Assessments is inadequate (noted by Mexico) and methodology not always good enough (noted by European countries); and, 3) Lowest-acquisition price often guides procurement decisions and thus may not align with needs of clinical procedures (noted by Mexico and some European countries). Procurement processes for orthopaedic HRMDs may have an impact on clinical procedures and outcomes. A favourable approach is one where orthopaedic specialists are parties to the procurement process

  4. 13 CFR 124.511 - How is fair market price determined for an 8(a) contract?

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false How is fair market price determined for an 8(a) contract? 124.511 Section 124.511 Business Credit and Assistance SMALL BUSINESS... that does not have a satisfactory procurement history, from a price or cost analysis. This analysis may...

  5. Patients' adherence to antiretroviral therapy at Antiretroviral Therapy ...

    African Journals Online (AJOL)

    Adherence is the most important factor influencing successful antiretroviral therapy. Long term success with antiretroviral therapy (ART) requires taking 95% of medication. Less than 95% adherence can result in less than optimal therapeutic response and drug resistance. The aim of this study was to determine the ...

  6. Antiretroviral drug supply challenges in the era of scaling up ART in Malawi.

    Science.gov (United States)

    Schouten, Erik J; Jahn, Andreas; Ben-Smith, Anne; Makombe, Simon D; Harries, Anthony D; Aboagye-Nyame, Francis; Chimbwandira, Frank

    2011-07-06

    The number of people receiving antiretroviral treatment (ART) has increased considerably in recent years and is expected to continue to grow in the coming years. A major challenge is to maintain uninterrupted supplies of antiretroviral (ARV) drugs and prevent stock outs. This article discusses issues around the management of ARVs and prevention of stock outs in Malawi, a low-income country with a high HIV/AIDS burden, and a weak procurement and supply chain management system. This system for ARVs, paid for by the Global Fund to Fight AIDS, Tuberculosis and Malaria, and bypassing the government Central Medical Stores, is in place, using the United Nations Children's Fund's (UNICEF's) procurement services. The system, managed by a handful of people who spend limited time on supply management, is characterized by a centrally coordinated quantification based on verified data from all national ART clinics, parallel procurement through UNICEF, and direct distribution to ART clinics. The model worked well in the first years of the ART programme with a single first-line ARV regimen, but with more regimens becoming available (e.g., alternative first-line, second-line and paediatric regimens), it has become more difficult to administer. Managing supplies through a parallel system has the advantage that weaknesses in the national system have limited influence on the ARV procurement and supply chain management system. However, as the current system operates without a central warehouse and national buffer stock capacity, it diminishes the ability to prevent ARV stock outs. The process of ordering ARVs, from the time that estimates are made to the arrival of supplies in health facilities, takes approximately one year. Addressing the challenges involved in maintaining ARVs through an efficient procurement and supply chain management system that prevents ARV stock outs through the establishment of a dedicated procurement team, a central warehouse and/or national buffer stock is a

  7. Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction

    Science.gov (United States)

    Trusaji, Wildan; Akbar, Muhammad; Sukoyo; Irianto, Dradjad

    2018-03-01

    In making bearing procurement analysis, price and its reliability must be considered as decision criteria, since price determines the direct cost as acquisition cost and reliability of bearing determine the indirect cost such as maintenance cost. Despite the indirect cost is hard to identify and measured, it has high contribution to overall cost that will be incurred. So, the indirect cost of reliability must be considered when making bearing procurement analysis. This paper tries to explain bearing evaluation method with the total cost of ownership analysis to consider price and maintenance cost as decision criteria. Furthermore, since there is a lack of failure data when bearing evaluation phase is conducted, reliability prediction method is used to predict bearing reliability from its dynamic load rating parameter. With this method, bearing with a higher price but has higher reliability is preferable for long-term planning. But for short-term planning the cheaper one but has lower reliability is preferable. This contextuality can give rise to conflict between stakeholders. Thus, the planning horizon needs to be agreed by all stakeholder before making a procurement decision.

  8. Access price regulation facilitates strategic transfer pricing

    OpenAIRE

    Fjell, Kenneth; Foros, Øystein

    2005-01-01

    Access price regulation is used in telecommunications to prevent that a vertically integrated firm, that controls an essential input, raises the rivals` costs. When the authorities remove the access price as a strategic tool, they at the same time make it optimal for the vertically integrated firm to reorganize from centralized pricing to decentralized pricing in order to use the transfer price as an alternative strategic device. To implement access price regulation, authorities use accountin...

  9. Contracting Out Government Procurement Functions: An Analysis

    National Research Council Canada - National Science Library

    Lamm, David; Yoder, Cory

    2008-01-01

    ...)), asked the Naval Postgraduate School (NPS) to analyze the contracting out of procurement functions currently being accomplished by Navy, Marine Corps, and other Department of Defense (DOD) Activities...

  10. The International Experience in Public Procurement

    Directory of Open Access Journals (Sweden)

    Pysmenna Mariia S.

    2017-11-01

    Full Text Available The article is aimed at generalizing the foreign experience of implementing public procurement, analyzing peculiarities of organizational, normative and procedural provision of public procurement in the Member States of the European Union. The relevance of the research topic is due to the need to harmonize the procurement policy of the Government of Ukraine with the international legal framework and with broad political objectives within the European integration strategy. The organizational framework and principles of implementing public procurement in the EU Member States were analyzed. Special attention was paid to normative provision of public procurement by the EU Member States; peculiarities of the use of national or harmonized rules of public procurement in accordance with the amount of the procurement contract; restrictions and conditions for public authorities in the selection of applicants for bidding. Five types of public procurement procedures used in the EU have been characterized, namely: open procedure, limited procedure, negotiation procedure, competitive dialog, electronic auctions. The need to address the social and legal aspects of public procurement in international practice has been substantiated and the possibilities for resolving these problems have been presented.

  11. PUBLIC PROCUREMENT SYSTEM IN RUSSIA

    Directory of Open Access Journals (Sweden)

    Alla V. Trofimovskaya

    2013-01-01

    Full Text Available This article contains information on the theoretical-methodological research of the Institute of public procurement. The focus is on the consideration of the implementation of the priority tasks for the state contract system and the role in their solving that regional level of management can play. Opportunities in the sphere of state regulation, that Moscow, as the subject of the Federation, has, are educed in the article. The problem of transformation the existing contractual mechanisms for the formation of the model of public contract system, is studied.

  12. The need for sensemaking and negotiation in procurement situations

    NARCIS (Netherlands)

    Hoezen, Mieke; Volker, L.; Javernick-Will, A.; Chinowsky, P.

    2012-01-01

    Since most of the infrastructure projects are being built with public money, public procurement regulations apply. Compared to regular partnerships, it is hard to develop trust in procurement situations. Inspired by transaction costs economics, procurement processes are still considered as

  13. 48 CFR 752.225-71 - Local procurement.

    Science.gov (United States)

    2010-10-01

    ... 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods... currency of the cooperating country. (b) All locally-financed procurements must be covered by source/origin...

  14. 77 FR 69381 - Designation of Product Categories for Federal Procurement

    Science.gov (United States)

    2012-11-19

    ... services in critical and industrial product cleaning and the other was from an individual citizen. The... procurement program: Agricultural spray adjuvants; animal cleaning products; deodorants; dethatcher products... when purchasing products and services. Other Preferred Procurement Programs. Federal procurement...

  15. Economic theory and the application of incentive contracts to procure operating reserves

    International Nuclear Information System (INIS)

    Wang, L.; Yu, C.W.; Wen, F.S.

    2007-01-01

    The ancillary services market plays an important role in the operation of an electricity market, especially for achieving a high level of reliability. Among all ancillary services, operating reserve is an important research focus, with the attention mainly on the optional procurement and pricing methods. These methods differ in many aspects, including the objective, allocation of risks, and feasibility. In this paper, a new approach is proposed to analyze the users' reserve procurement problem and a novel reserve trade mechanism is developed between electricity users and the retailer of the market. First, the differences between the procurement of operating reserve in decentralized and centralized ways are analyzed. The comparison of the equilibrium solutions reveals that the centralized procurement that results in a systemic optimal solution is better than the decentralized procurement that results in a Nash equilibrium solution. Furthermore, an incentive contract based on a Principal-agent model, that is able to induce a systemic optimality as well as a Pareto equilibrium and manage risks at the same time is designed. The proposed model is equitable and beneficial to all participants. An example is served to illustrate the features of the model and the methodology. (author)

  16. 32 CFR 21.670 - Procurement contract.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement contract. 21.670 Section 21.670 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.670 Procurement contract. A legal...

  17. public procurement, governance and economic growth

    African Journals Online (AJOL)

    GRACE

    (2003: 2), ―strong procurement management in the public sector is a tool for achieving political, economic and social goals‖. Thus .... professionalism in the public sector procurement system (Section 4, PPA, 2007). The functions and powers of the ..... K., Bose, N. and Haque, M.E. (2004). Public Expenditures, Bureaucratic.

  18. International Research Study of Public Procurement

    NARCIS (Netherlands)

    Telgen, Jan; Harland, C.; Callender, G.; Harland, C.; Nassimbeni, G.; Schneller, E.

    2012-01-01

    In this chapter we examine the specific issue of public procurement, its importance to local, regional, national, and international economies as evidenced in a unique international comparative research study – the International Research Study of Public Procurement (IRSPP). First the public

  19. 48 CFR 2903.104 - Procurement integrity.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Procurement integrity. 2903.104 Section 2903.104 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL IMPROPER BUSINESS PRACTICES AND PERSONAL CONFLICTS OF INTEREST Safeguards 2903.104 Procurement integrity. ...

  20. 75 FR 47550 - Procurement List; Additions

    Science.gov (United States)

    2010-08-06

    ...--Macintosh Apple NSN: MR 473--Fresh Linen NPA: Industries for the Blind, Inc., West Allis, WI Contracting... Service, 5777 S. Aviation Blvd., N. Charleston, SC NPA: Goodwill Industries of Lower South Carolina, Inc... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be...

  1. Assessment of procurement methods used for executing ...

    African Journals Online (AJOL)

    traditional contract, cost reimbursement contract and measured term contracts, are the most commonly adopted procurement methods in Lagos state for maintenance works. Time duration, cost of project and quality level required, are the major factors influencing the choice of procurement methods. Others are risk allocation, ...

  2. 42 CFR 495.348 - Procurement standards.

    Science.gov (United States)

    2010-10-01

    ... unfair competitive advantage, contractors that develop or draft grant applications, or contract... the material, product or service to be procured. In competitive procurements, such a description must... small businesses, minority-owned firms, and women's business enterprises, whenever possible. Grantees of...

  3. 76 FR 19751 - Procurement List; Addition

    Science.gov (United States)

    2011-04-08

    ... who otherwise face significant barriers to employment. These employees will be paid service contract... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Addition AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Addition to the Procurement List. SUMMARY: This action...

  4. 20 CFR 435.44 - Procurement procedures.

    Science.gov (United States)

    2010-04-01

    .../offeror must fulfill and all other factors to be used in evaluating bids or proposals. (iii) A description... offer is received in response to a solicitation. (3) The procurement, which is expected to exceed the... procurement. (5) A proposed contract modification changes the scope of a contract or increases the contract...

  5. 29 CFR 95.44 - Procurement procedures.

    Science.gov (United States)

    2010-07-01

    ... must fulfill and all other factors to be used in evaluating bids or proposals. (iii) A description... offer is received in response to a solicitation. (3) The procurement, which is expected to exceed the... procurement. (5) A proposed contract modification changes the scope of a contract or increases the contract...

  6. 36 CFR 1210.44 - Procurement procedures.

    Science.gov (United States)

    2010-07-01

    ... factors to be used in evaluating bids or proposals. (iii) A description, whenever practicable, of... or only one bid or offer is received in response to a solicitation. (3) The procurement, which is... bid procurement. (5) A proposed contract modification changes the scope of a contract or increases the...

  7. 32 CFR 32.44 - Procurement procedures.

    Science.gov (United States)

    2010-07-01

    ... factors to be used in evaluating bids or proposals. (iii) A description, whenever practicable, of... competition or only one bid or offer is received in response to a solicitation. (3) The procurement, which is... under a sealed bid procurement. (5) A proposed contract modification changes the scope of a contract or...

  8. 2 CFR 215.44 - Procurement procedures.

    Science.gov (United States)

    2010-01-01

    ... competition. (ii) Requirements which the bidder/offeror must fulfill and all other factors to be used in... or only one bid or offer is received in response to a solicitation. (3) The procurement, which is... bid procurement. (5) A proposed contract modification changes the scope of a contract or increases the...

  9. 77 FR 27737 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-05-11

    ... Attendant service tasks as post cleaning of eating utensils, compartmented trays, beverage containers...; provide equipment cleaning service, perform facility maintenance and sanitation; provide trash and garbage... additions to the Procurement List. SUMMARY: The Committee is proposing to add services to the Procurement...

  10. 78 FR 45183 - Procurement List Additions

    Science.gov (United States)

    2013-07-26

    ... Requirement as aggregated by the General Services Administration. NSN: 7920-00-NIB-0564--Towel, Cleaning, Non... Procurement List. SUMMARY: This action adds a products and services to the Procurement List that will be... presented to it concerning capability of qualified nonprofit agencies to provide the products and services...

  11. Sales analysis as a basis for optimising gas procurement; Absatzanalyse als Grundlage optimierter Gasbeschaffung

    Energy Technology Data Exchange (ETDEWEB)

    Jungblut, Ralf [RWE Vertrieb AG, Dortmund (Germany). Produktmanagement, Marketing und Datenmanagement

    2012-01-15

    German energy suppliers are finding themselves in an increasingly difficult situation in the gas market. With the natural gas glut subsiding and global demand picking up, gas prices are expected to rise over the long term. Counter to the global trend, gas demand in Germany is expected to decrease. Furthermore, short-term fluctuations in economic activity with a potential for impacting on the demand for and price level of natural gas may pose significant economic risks. A detailed knowledge of one's own sales portfolio is therefore extremely important when it comes to gas procurement.

  12. ONLINE PROCUREMENT IN SME`s

    Directory of Open Access Journals (Sweden)

    Daniela ICHIM

    2017-12-01

    Full Text Available E-Marketplaces are new business places for buying, selling products and services in many industries to support customers. The emergence of business-to-business (B2B in the online environment has opened up opportunities for effective online transactions between businesses. Research in this area is not enough to offer only fragmented perspectives in this area. Therefore, the targeted research problem was designed to investigate how business performance of online B2B purchases can be analyzed. The proposed study focuses on the online procurement in. Specifically, they try to answer questions such as: Does site, product, and vendor characteristics affect the online procurement in? Does online buying experience influence online procurement by? Participants are that use the Internet to procure products or services. Study respondents were SME managers who believe that online procurement will save time, money and effort, reducing costs.

  13. Impact of price deregulation policy on the affordability of essential medicines for women's health: a panel data analysis.

    Science.gov (United States)

    Liu, Junjie; Wang, Liming; Liu, Chenxi; Zhang, Xinping

    2017-12-01

    A new policy which required deregulation on prices of off-patent medicines for women's health during procurement was introduced in China in September 2015. The current study examines this policy's impact on the affordability of essential medicines for women's health. Based on product-level panel data, a fixed effect regression model is employed by using procurement records from Hubei Centralist Tender for Drug Purchase platform. In the model, Affordability was measured with prices. The Competition consists of two parts: generic competition and therapeutic class competition which are measured with generic competitors and therapeutic substitutes. Instrument variable is used to deal with endogeneity. The policy helped control prices of essential medicines for women's health. Generic competition helped control prices, however, therapeutic class competition caused higher prices. The new policy helped enhance the affordability of essential medicines for women's health as expected, which provides empirical evidence on price deregulation. Besides, generic competition is important in price control despite strict regulatory system in China.

  14. MARKET ECONOMICS PRICING PARTICULARS

    Directory of Open Access Journals (Sweden)

    V. I. Parshin

    2011-01-01

    Full Text Available The price performs several economic functions: accounting, stimulation, distribution, demand and offer balancing, serving as production site rational choice criterion, information. Most important pricing principles are: price scientific and purpose-aimed substantiation, single pricing and price control process. Pricing process factors are external, internal, basic (independent on money-market, market-determined and controlling. Different pricing methods and models are to be examined, recommendations on practical application of those chosen are to be written.

  15. Energy prices and taxes

    International Nuclear Information System (INIS)

    2004-01-01

    Energy Prices and Taxes contains a major international compilation of energy prices at all market levels: import prices, industry prices and consumer prices. The statistics cover main petroleum products, gas, coal and electricity, giving for imported products an average price both for importing country and country of origin. Every issue includes full notes on sources and methods and a description of price mechanisms in each country

  16. Traditional Procurement is too Slow

    Directory of Open Access Journals (Sweden)

    Ann Kong

    2012-11-01

    Full Text Available This paper reports on an exploratory interview survey of construction project participants aimed at identifying the reasons for the decrease in use of the traditional, lump-sum, procurement system in Malaysia. The results show that most people believe it is too slow. This appears to be in part due to the contiguous nature of the various phase and stages of the process and especially the separation of the design and construction phases. The delays caused by disputes between the various parties are also seen as a contributory factor - the most prominent cause being the frequency of variations, with design and scope changes being a particular source of discontent. It is concluded that an up scaling of the whole of the time related reward/penalty system may be the most appropriate measure for the practice in future.

  17. What Is the Status of Indonesian E-Procurement?

    Directory of Open Access Journals (Sweden)

    Achmad Nurmandi

    2013-08-01

    Full Text Available E-procurement is an important intrument to prevent corruption in goods and services procurement budget. Indonesia has been implementing the e-procurement project since 2008 based on Presidential Decree. President has stipulating annual order (presidential instruction has to be obey by all ministries and local governments to procure their budget through r-procurement mechanism. However, untill 2012 fiscal year, this research found that only around 10.26% of central government institution procurement budget, including ministries and 21,10% of local government procurement budget did procure through e-procurement method. This research concluded that regulation, leadership and procurement intitution are challanging factors to make “status quo” e-procurement.

  18. Intellectual property rights, market competition and access to affordable antiretrovirals.

    Science.gov (United States)

    Pascual, Fernando

    2014-01-01

    The number of patients receiving antiretroviral therapy (ART) has increased from around half a million in 2003 to almost 10 million in only 10 years, and will continue to increase in the coming years. Over 16 million more are eligible to start ART according to the last World Health Organization (WHO) guidelines. The demand is also switching from the less expensive antiretrovirals (ARVs) that allowed such scale-up to newer more expensive ones with fewer side effects or those that can be used by people who have developed resistance to first-line treatment. However, patents on these new drugs can delay robust generic competition and, consequently, price reduction made possible by economies of scale. Various ways to address this issue have been envisaged or implemented, including the use of the flexibilities available under the Agreement on Trade-Related Aspects of Intellectual Property Rights (TRIPS), systematic widespread voluntary licensing, of which the Medicines Patent Pool (MPP) is an example, and the application of different prices in different countries, called tiered pricing. This paper helps explain the impact of patents on market competition for ARVs and analyses various approaches available today to minimize this impact.

  19. Environmental Criteria in the Spanish Public Works Procurement Process.

    Science.gov (United States)

    Fuentes-Bargues, José Luis; González-Cruz, Mª Carmen; González-Gaya, Cristina

    2017-02-18

    Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group of countries, known as "Green 7", in the European Union. Environmental criteria is the fourth criterion in importance, but its weight in the global of the process is much lower than other criteria such as price, memory of the construction process and the delivery time. National administrations use environmental criteria more frequently because they have more resources and staff training about environmental issues. Environmental criteria are more used in the tendering of civil projects and works whose budget exceeds ten million euro due to the environmental impact of these kind and/or size of projects.

  20. Environmental Criteria in the Spanish Public Works Procurement Process

    Directory of Open Access Journals (Sweden)

    José Luis Fuentes-Bargues

    2017-02-01

    Full Text Available Green Public Procurement (GPP is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group of countries, known as “Green 7”, in the European Union. Environmental criteria is the fourth criterion in importance, but its weight in the global of the process is much lower than other criteria such as price, memory of the construction process and the delivery time. National administrations use environmental criteria more frequently because they have more resources and staff training about environmental issues. Environmental criteria are more used in the tendering of civil projects and works whose budget exceeds ten million euro due to the environmental impact of these kind and/or size of projects.

  1. Price discrimination in essential medicines: evidence from International Drug Price Indicator Guide data.

    Science.gov (United States)

    Hanlon, Michael; Zhang, Raymond

    2013-03-01

    Few data are available on what donors, governments and other implementing organisations pay for the medicines they procure. To partly address this shortcoming, we analyse transactions of pharmaceuticals on the WHO's essential medicines list. Our objective was to identify the determinants of prices paid for these drugs. We used data from the 2008 version of the International Drug Price Indicator Guide. We normalised transactions by representing their value as a 'price per daily dose'. We used a mixed-effects regression model to quantify the impact of observable characteristics on prices paid. We present evidence of first-degree price discrimination in the market for essential medicines. We find that as a country's per capita wealth doubles, prices paid for the same pharmaceutical increase by 33%. These data indicate that purchasing agents from wealthier countries pay more for essential medicines, all factors constant. This behaviour is not a form of development assistance for health but rather is indicative of inefficient markets in which buyers' lack of information enables suppliers to charge higher prices than they could otherwise.

  2. Microeconomics of the Productivity, Price Indicators and Farm Incomes. Analytical Approach

    Directory of Open Access Journals (Sweden)

    Włodzimierz Rembisz

    2011-07-01

    Full Text Available The paper develops a farm producer behavior type model to analyze the impact of a input productivity and price change on farm incomes. The theoretical analysis shows the consequences of the balance between the increase of production factor prices and their productivity improvement in the condition of stable procurement price for the farm producers income. The cost effect of the production factors price increment and its neutralization by productivity (TFP-type growth is examined as well as some aspects of the inputs shares (returns and costs in the produce value. The article argues that labor input productivity as an endogenous factor, is an essential for farm incomes growth assuming the specified type of the farm producer utility function (its equations and variables as well as no the compensative procurement price change conditions. Some empirical evidence is attached however more work in that respect is foreseen.

  3. Clinical laboratory test prices in Zimbabwe: A case of profiteering?

    Science.gov (United States)

    Musarurwa, C; Nyamayaro, T; Mujaji, W B; Matarira, H T; Gomo, Z A R

    2012-01-01

    To compare the prices charged for clinical laboratory tests in Zimbabwean institutions with those of similar institutions abroad. An online analytical cross sectional study was conducted. An online survey. We did an online survey of clinical laboratories that published prices of the tests offered on their websites. We also extracted price information from documents published by fees regulatory authorities. Laboratory test prices for independent institutions, Laboratory test prices for State institutions. Overally for all countries, laboratory test prices were lower in state laboratories compared to the independent laboratories. In Zimbabwe, state laboratories generally charged about 50% of the independent laboratory tariff for most tests. However prices from both Zimbabwean institutions were generally much higher than those of the comparison countries (United Kingdom, South Africa, India, United States of America and New Zealand). Prices of laboratory tests are indeed higher in Zimbabwean institutions compared to other centres abroad. These higher prices could be attributed to challenges in consumable procurement logistics. We also present measures that could be put in place to reduce the costs and therefore prices.

  4. Towards the procurement of the ITER divertor

    International Nuclear Information System (INIS)

    Merola, M.; Tivey, R.; Martin, A.; Pick, M.

    2006-01-01

    The procurement of the ITER divertor is planned to start in 2009. On the basis of the present common understanding of the sharing of the ITER components, the Japanese Participating Team (JAPT) will supply the outer vertical target, the Russian Federation (RF) PT the dome liner and will perform the high heat flux testing, the EU PT will supply the inner vertical targets and the cassette bodies, including final assembly of the divertor plasma-facing components (PFCs). The manufacturing of the PFCs of the ITER divertor represents a challenging endeavor due to the high technologies which are involved, and due to the unprecedented series production. To mitigate the associated risks, special arrangements need to be put in place prior to and during procurement to ensure quality and to keep to the time schedule. Before procurement can start, an ITER review of the qualification and production capability of each candidate PT is planned. Well in advance of the assumed start of the procurement, each PT which would like to contribute to the divertor PFC procurement, should first demonstrate its technical qualification to carry out the procurement with the required quality, and in an efficient and timely manner. Appropriate precautions, like subdivision of the procurement into stages, are also to be adopted during the procurement phase to mitigate the consequences of possible unexpected manufacturing problems. In preparation for writing the procurement specification for the vertical targets, the topic of setting acceptance criteria is also being addressed. This activity has the objective of defining workable acceptance criteria for the PFC armour joints. A complete set of analyses is also in progress to assess the latest design modifications against the design requirements. This task includes neutronic, shielding, thermo-mechanical and electromagnetic analyses. More than half of the ITER plasma parameters that must be measured and the related diagnostics are located in the

  5. 41 CFR 51-2.8 - Procurement list.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Procurement list. 51-2.8... WHO ARE BLIND OR SEVERELY DISABLED § 51-2.8 Procurement list. (a) The Committee maintains a Procurement List which includes the commodities and services which shall be procured by Government departments...

  6. 41 CFR 105-72.506 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Procurement records. 105... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards § 105-72.506 Procurement records. Procurement records and files for purchases in excess of the small...

  7. 14 CFR 1212.705 - Assistant Administrator for Procurement.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Assistant Administrator for Procurement... ACT-NASA REGULATIONS NASA Authority and Responsibilities § 1212.705 Assistant Administrator for Procurement. The Assistant Administrator for Procurement is responsible for developing appropriate procurement...

  8. 22 CFR 226.49 - USAID-Specific procurement requirements

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false USAID-Specific procurement requirements 226.49... TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.49 USAID-Specific procurement requirements Procurement requirements which are applicable to USAID because of statute...

  9. Price adjustment clauses : report.

    Science.gov (United States)

    2012-10-01

    Price adjustment mechanisms exist to account for fluctuations in commodity or labor prices and have : been used for highway construction in 47 states. They are useful in stabilizing bid prices in times of : economic uncertainty and preventing default...

  10. Industry Analysis for Body Armor Procurement

    National Research Council Canada - National Science Library

    Foust, Coleen; Jenson, Christopher

    2006-01-01

    .... In addition, the Office of Management and Budget has required that each agency create strategic sourcing initiatives, monitor the cost savings and report the results to the Office of Federal Procurement Policy...

  11. Standard Procurement System Use and User Satisfaction

    National Research Council Canada - National Science Library

    2001-01-01

    The audit was performed in response to concerns expressed by the Chairman, House of Representatives Committee on Budget that DoD was not effectively spending Federal funds to acquire the Standard Procurement System (SPS...

  12. 76 FR 76952 - Procurement List Additions

    Science.gov (United States)

    2011-12-09

    ... published notices of proposed additions to the Procurement List. After consideration of the material.... 1018--Scrubber, Non Scratch, Tub and Shower. NPA: Industries for the Blind, Inc., West Allis, WI...

  13. ASSESSMENT OF PROCUREMENT METHODS USED FOR ...

    African Journals Online (AJOL)

    Osondu

    2012-10-08

    Adenuga, 2005). The statement of the problem. Building maintenance is a key factor in the construction industry contributing to overall client satisfaction and project success and the procurement of these services are to be critically.

  14. Government Procurement Agreements and Telecommunications Business

    Directory of Open Access Journals (Sweden)

    Shin-Won Kang

    2001-12-01

    Full Text Available The opening of the telecommunications market is acceleration due to the world trends of deregulation and privatization under the WTO basic telecommunications agreements. Diversification of services and fast and efficient equipment procurement are becoming necessary conditions for the survival of telecommunications operators. However, the issue here is that telecommunications operators are still bound by the GPA (Government Procurement Agreement based on conditions of monopoly even though the procurement market in Korean is open substantially since 1997. Under such conditions, the continued application of the GPA on telecommunications operator who is highly competitive may result in a negative impact on the telecommunications business and quality of telecommunications service by undermining the autonomy of operator and decreasing operator’s procurement competitiveness. Therefore, this study examines the GPA and the issues raised by the agreement, and also attempts to suggest revisions or means of abrogating the unfair GPA with regards to the development and deregulation of the telecommunications business.

  15. 24 CFR 84.84 - Procurement standards.

    Science.gov (United States)

    2010-04-01

    ... unfair competitive advantage, contractors that develop or draft specifications, requirements, statements... competitive procurements, such a description shall not contain features which unduly restrict competition. (B... recipients to utilize small businesses, minority-owned firms, and women's business enterprises, whenever...

  16. Federal Procurement Data System - FPDS API

    Data.gov (United States)

    General Services Administration — The Federal Procurement Data System (FPDS) Next Generation has been re-engineered as a real-time federal enterprise information system. Web services based on SOAP...

  17. Food Price Spikes, Price Insulation, and Poverty

    OpenAIRE

    Anderson, Kym; Ivanic, Maros; Martin, Will

    2013-01-01

    This paper has two purposes. It first considers the impact on world food prices of the changes in restrictions on trade in staple foods during the 2008 world food price crisis. Those changes -- reductions in import protection or increases in export restraints -- were meant to partially insulate domestic markets from the spike in international prices. The authors find that this insulation a...

  18. Data Analytics in Procurement Fraud Prevention

    OpenAIRE

    Lanclos, Joseph; Phillips, Thurman; Naval Postgraduate School Acquisition Research Program

    2014-01-01

    No PDF Available. Annual Acquisition Research Symposium The purpose of this research project is to explore the viability of detecting anomalies through using data analytics software as a tool in procurement fraud prevention and to analyze its potential policy implications on federal procurement stakeholders. According to a survey conducted in 2012 by the Association of Certified Fraud Examiners, organizations lose an estimated 5% of their revenues to fraud each year. In order to relate ...

  19. The procurement process in the hotel industry

    OpenAIRE

    Pavia, Nadia; Ivanovic, Sasa

    2007-01-01

    Procurement has a vital role in the hotel industry, with hotel performance depending largely upon how well it operates. This role consists of ensuring the continuous supply of a hotel and its departments with the materials and equipment required to operate a hotel, enable its warehousing and transportation divisions to function properly and ensure the sales of the prepared services. The organisational structure of a hotel and its procurement department needs to be designed in such a way that ...

  20. Multidimensional procurement auctions with unknown weights

    DEFF Research Database (Denmark)

    Greve, Thomas

    This paper studies the consequences of holding a procurement auction when the principal chooses not to show its preferences. My paper extends the procurement auction model of Che (1993) to a situation where both the principal and the agents have private information. Thus, unknown parameters of bo...... gives rise to an analysis of a principal that can not fully commit to the outcome induced by the scoring rule. Therefore, my result apply to contract theory and it’s problems with imperfect commitment....

  1. Pricing and Trust

    DEFF Research Database (Denmark)

    Huck, Steffen; Ruchala, Gabriele K.; Tyran, Jean-Robert

    We experimentally examine the effects of flexible and fixed prices in markets for experience goods in which demand is driven by trust. With flexible prices, we observe low prices and high quality in competitive (oligopolistic) markets, and high prices coupled with low quality in non-competitive...... (monopolistic) markets. We then introduce a regulated intermediate price above the oligopoly price and below the monopoly price. The effect in monopolies is more or less in line with standard intuition. As price falls volume increases and so does quality, such that overall efficiency is raised by 50%. However...

  2. Procurement management in scientific research and production project

    International Nuclear Information System (INIS)

    Wan Yi

    2008-01-01

    To meet the requirement of development trend of scientific research and production, it is necessary to incorporate the modern procurement management theory in the whole procurement process for the items used in scientific research and production.This paper provided some suggestions to improve the procurement management by introducing the experiences in the application of the modern procurement management methods in the procurement of parts production. (author)

  3. Donor selection criteria and procurement

    International Nuclear Information System (INIS)

    Agcaoili, N.R.

    1999-01-01

    Donor selection is one of the most important aspects of tissue banking practice. Without a good donor selection criteria, the results of any effort of trying to preserve tissues will have disastrous outcome for the recipient of these tissues. While with a very good and strict donor selection the Tissue Bank can guarantee safe and effective tissue allografts. There are significant aspects in the history and physical examination of the donor that must be emphasized. A donor exclusion criteria has also been formulated together with a list of all the needed laboratory examinations to eliminate possible diseases that may be transferred from the donor. The methods of procurement of tissue allografts from living and cadaver donors will be described. The limitations and advantages of each will be taken.There are also special restrictions that are important in the practice of removing the tissues from the donors. All the necessary equipment should be ready and the potential risk on the personnel should be known to all doing Tissue Banking

  4. An evaluation of transit procurement training.

    Science.gov (United States)

    Noland, Robert B; Weiner, Marc D; Klein, Nicholas J; Puniello, Orin D

    2017-04-01

    We evaluated a training course called "Orientation to Transit Procurement", designed and conducted by the National Transit Institute. This course is designed to provide Federal Transit Administration (FTA) grantees an overview of regulations and best practices related to the procurement process. Our objective in conducting the evaluation was to understand how transit agency staff made changes in procurement practices in response to the course training. The evaluation was mixed mode: an Internet survey followed by in-depth interviews with a small group of respondents. Survey respondents were also provided with an open-ended question providing us with additional context for our evaluation. Results show that the training is substantially successful at meeting the goal of improving procurement practices at transit agencies; indeed, most respondents report making changes at their agencies as the proximate result of the training. This was at odds with our exploration of knowledge of procurement topics, as most respondents gave inaccurate answers on multiple-choice "knowledge questions". This may have been due to question structure or, more likely, the nature of online surveys. Suitable training on the procurement of information technology was also a main concern. The lack of training in this area is indicative of the broader challenge facing public transit agencies in how to incorporate new forms of technology into their existing practices and bureaucratic structures. Copyright © 2016 Elsevier Ltd. All rights reserved.

  5. Bioanalysis, metabolism & clinical pharmacology of antiretroviral drugs

    NARCIS (Netherlands)

    Heine, R. ter

    2009-01-01

    The aims of all studies described in this thesis were to develop new bioanalytical and more patient friendly methods for studying the clinical pharmacology of antiretroviral drugs and to ultimately improve antiretroviral treatment.

  6. Competitive Pricing by a Price Leader

    OpenAIRE

    Abhik Roy; Dominique M. Hanssens; Jagmohan S. Raju

    1994-01-01

    We examine the problem of pricing in a market where one brand acts as a price leader. We develop a procedure to estimate a leader's price rule, which is optimal given a sales target objective, and allows for the inclusion of demand forecasts. We illustrate our estimation procedure by calibrating this optimal price rule for both the leader and the follower using data on past sales and prices from the mid-size sedan segment of the U.S. automobile market. Our results suggest that a leader-follow...

  7. Predicting Global Fund grant disbursements for procurement of artemisinin-based combination therapies

    Directory of Open Access Journals (Sweden)

    O'Brien Megan E

    2008-10-01

    Full Text Available Abstract Background An accurate forecast of global demand is essential to stabilize the market for artemisinin-based combination therapy (ACT and to ensure access to high-quality, life-saving medications at the lowest sustainable prices by avoiding underproduction and excessive overproduction, each of which can have negative consequences for the availability of affordable drugs. A robust forecast requires an understanding of the resources available to support procurement of these relatively expensive antimalarials, in particular from the Global Fund, at present the single largest source of ACT funding. Methods Predictive regression models estimating the timing and rate of disbursements from the Global Fund to recipient countries for each malaria grant were derived using a repeated split-sample procedure intended to avoid over-fitting. Predictions were compared against actual disbursements in a group of validation grants, and forecasts of ACT procurement extrapolated from disbursement predictions were evaluated against actual procurement in two sub-Saharan countries. Results Quarterly forecasts were correlated highly with actual smoothed disbursement rates (r = 0.987, p Conclusion This analysis derived predictive regression models that successfully forecasted disbursement patterning for individual Global Fund malaria grants. These results indicate the utility of this approach for demand forecasting of ACT and, potentially, for other commodities procured using funding from the Global Fund. Further validation using data from other countries in different regions and environments will be necessary to confirm its generalizability.

  8. Trends in medicines procurement by the Brazilian federal government from 2006 to 2013.

    Directory of Open Access Journals (Sweden)

    Tatiana Chama Borges Luz

    Full Text Available The costs of medicines pose a growing burden on healthcare systems worldwide. A comprehensive understanding of current procurement processes provides strong support for the development of effective policies. This study examined Brazilian Federal Government pharmaceutical procurement data provided by the Integrated System for the Administration of General Services (SIASG database, from 2006 to 2013. Medicine purchases were aggregated by volume and expenditure for each year. Data on expenditure were adjusted for inflation using the Extended National Consumer Price Index (IPCA for December 31, 2013. Lorenz distribution curves were used to study the cumulative proportion of purchased therapeutic classes. Expenditure variance analysis was performed to determine the impact of each factor, price and/or volume, on total expenditure variation. Annual expenditure on medicines increased 2.72 times, while the purchased volume of drugs increased 1.99 times. A limited number of therapeutic classes dominated expenditure each year. Drugs for infectious diseases drove the increase in expenditures from 2006 to 2009 but were replaced by antineoplastic and immunomodulating agents beginning in 2010. Immunosuppressants (L04, accounted for one third of purchases since 2010, showing the most substantial growth in expenditures during the period (250-fold increase. The overwhelming price-related increase in expenditures caused by these medicines is bound to have a relevant impact on the sustainability of the pharmaceutical supply system. We observed increasing trends in expenditures, especially in specific therapeutic classes. We propose the development and implementation of better medicine procurement systems, and strategies to allow for monitoring of product price, effectiveness, and safety. This must be done with ongoing assessment of pharmaceutical innovations, therapeutic value and budget impact.

  9. Launch of the "MICE Procurement" website for your future events

    CERN Document Server

    The MICE Office team

    2014-01-01

    The number of MICE (Meeting, Incentive, Conference and Event) requests is on the increase and our hotel offer is constantly being developed.   The MICE Office has decided to create a dedicated website in order to offer the best possible service to its users. This site is accessible from the FP webpage (MICE Procurement) using your NICE login. It gives you access to the list of the establishments which have a contract with CERN, grouped by geographic area/star rating, and all related information. The establishments listed on this website can accommodate your local events, organised by CERN or in partnership with an institution. They were selected following a market survey and as a result of a price enquiry in accordance with CERN's Purchasing Rules. We offer a number of standard packages, but we will try to respond to any specific requirements. On the same site you can also access a longer list of hotels (also accessible via the GS website) for which prices and conditions have been nego...

  10. A robust internet-based auction to procure electricity forwards

    International Nuclear Information System (INIS)

    Woo, C.K.; Lloyd, D.; Borden, M.; Warrington, R.; Baskette, C.

    2004-01-01

    Securing forward contracts to manage procurement-cost risk is an intuitively appealing and economically reasonable strategy for a load-serving local distribution company (LDC) in today's volatile electricity marketplace. However, knowing what to buy does not guarantee least-cost implementation. The forward-contract price quoted by a prospective seller may not be the 'best deal' that an LDC could have obtained, especially when the forward contract desired by the LDC is not actively traded. This paper reports the results from five internet-based auctions for electricity forward contracts with non-firm delivery and varying hourly quantities held monthly by a Florida municipal utility (MU) from September 2002 to January 2003. The results confirm that a multi-round auction design is robust in realizing competitive price offers made by credit-worthy sellers, time-efficient contracting, and consistent cost savings to the MU. Thus, the Anglo-Dutch auction described herein is a reasonable substitute for generation ownership by an LDC. (author)

  11. Strategies for price reduction of HIV medicines under a monopoly situation in Brazil

    Directory of Open Access Journals (Sweden)

    Gabriela Costa Chaves

    2015-01-01

    Full Text Available ABSTRACT OBJECTIVE To analyze Government strategies for reducing prices of antiretroviral medicines for HIV in Brazil. METHODS Analysis of Ministry of Health purchases of antiretroviral medicines, from 2005 to 2013. Expenditures and costs of the treatment per year were analyzed and compared to international prices of atazanavir. Price reductions were estimated based on the terms of a voluntary license of patent rights and technology transfer in the Partnership for Productive Development Agreement for atazanavir. RESULTS Atazanavir, a patented medicine, represented a significant share of the expenditures on antiretrovirals purchased from the private sector. Prices in Brazil were higher than international references, and no evidence was found of a relationship between purchase volume and price paid by the Ministry of Health. Concerning the latest strategy to reduce prices, involving local production of the 200 mg capsule, the price reduction was greater than the estimated reduction. As for the 300 mg capsule, the amounts paid in the first two years after the Partnership for Productive Development Agreement were close to the estimated values. Prices in nominal values for both dosage forms remained virtually constant between 2011 (the signature of the Partnership for Productive Development Agreement, 2012 and 2013 (after the establishment of the Partnership. CONCLUSIONS Price reduction of medicines is complex in limited-competition environments. The use of a Partnership for Productive Development Agreement as a strategy to increase the capacity of local production and to reduce prices raises issues regarding its effectiveness in reducing prices and to overcome patent barriers. Investments in research and development that can stimulate technological accumulation should be considered by the Government to strengthen its bargaining power to negotiate medicines prices under a monopoly situation.

  12. Strategies for price reduction of HIV medicines under a monopoly situation in Brazil.

    Science.gov (United States)

    Chaves, Gabriela Costa; Hasenclever, Lia; Osorio-de-Castro, Claudia Garcia Serpa; Oliveira, Maria Auxiliadora

    2015-01-01

    To analyze Government strategies for reducing prices of antiretroviral medicines for HIV in Brazil. Analysis of Ministry of Health purchases of antiretroviral medicines, from 2005 to 2013. Expenditures and costs of the treatment per year were analyzed and compared to international prices of atazanavir. Price reductions were estimated based on the terms of a voluntary license of patent rights and technology transfer in the Partnership for Productive Development Agreement for atazanavir. Atazanavir, a patented medicine, represented a significant share of the expenditures on antiretrovirals purchased from the private sector. Prices in Brazil were higher than international references, and no evidence was found of a relationship between purchase volume and price paid by the Ministry of Health. Concerning the latest strategy to reduce prices, involving local production of the 200 mg capsule, the price reduction was greater than the estimated reduction. As for the 300 mg capsule, the amounts paid in the first two years after the Partnership for Productive Development Agreement were close to the estimated values. Prices in nominal values for both dosage forms remained virtually constant between 2011 (the signature of the Partnership for Productive Development Agreement), 2012 and 2013 (after the establishment of the Partnership). Price reduction of medicines is complex in limited-competition environments. The use of a Partnership for Productive Development Agreement as a strategy to increase the capacity of local production and to reduce prices raises issues regarding its effectiveness in reducing prices and to overcome patent barriers. Investments in research and development that can stimulate technological accumulation should be considered by the Government to strengthen its bargaining power to negotiate medicines prices under a monopoly situation.

  13. Strategies for price reduction of HIV medicines under a monopoly situation in Brazil

    Science.gov (United States)

    Chaves, Gabriela Costa; Hasenclever, Lia; Osorio-de-Castro, Claudia Garcia Serpa; Oliveira, Maria Auxiliadora

    2016-01-01

    ABSTRACT OBJECTIVE To analyze Government strategies for reducing prices of antiretroviral medicines for HIV in Brazil. METHODS Analysis of Ministry of Health purchases of antiretroviral medicines, from 2005 to 2013. Expenditures and costs of the treatment per year were analyzed and compared to international prices of atazanavir. Price reductions were estimated based on the terms of a voluntary license of patent rights and technology transfer in the Partnership for Productive Development Agreement for atazanavir. RESULTS Atazanavir, a patented medicine, represented a significant share of the expenditures on antiretrovirals purchased from the private sector. Prices in Brazil were higher than international references, and no evidence was found of a relationship between purchase volume and price paid by the Ministry of Health. Concerning the latest strategy to reduce prices, involving local production of the 200 mg capsule, the price reduction was greater than the estimated reduction. As for the 300 mg capsule, the amounts paid in the first two years after the Partnership for Productive Development Agreement were close to the estimated values. Prices in nominal values for both dosage forms remained virtually constant between 2011 (the signature of the Partnership for Productive Development Agreement), 2012 and 2013 (after the establishment of the Partnership). CONCLUSIONS Price reduction of medicines is complex in limited-competition environments. The use of a Partnership for Productive Development Agreement as a strategy to increase the capacity of local production and to reduce prices raises issues regarding its effectiveness in reducing prices and to overcome patent barriers. Investments in research and development that can stimulate technological accumulation should be considered by the Government to strengthen its bargaining power to negotiate medicines prices under a monopoly situation. PMID:26759969

  14. Price Reversal Pattern of ARV Drugs: A Transaction-Cost Approach Digression

    Directory of Open Access Journals (Sweden)

    Frank LORNE

    2015-05-01

    Full Text Available A price reversal pattern of ARV drugs was noted across lower and middle income countries in that the lower-income countries have higher prices relative to higher-income countries based on a 2008-2009 Summary Report by World Health Organization. The transaction costs affecting AVR drug pricing can be broadly classified into two kinds: One between the final users and the opinion/knowledge experts, and the other between the opinion/knowledge experts and the manufacturers. Economist’s version of price discrimination needs to be modified by including transaction costs. Transaction costs also point to institution creditability factors that will affect NGO procurement.

  15. Cornea procurement, preservation and transplantation

    International Nuclear Information System (INIS)

    Hudson Silva

    1999-01-01

    Our experience on this subject is 40 years and we have seen the developments everywhere during this total period. Cornea procurement has been an unsurmountable problem in a large number of countries, mostly due to social and cultural reasons. The requirements for a simple eye bank to manage the supply for a local hospital are minimal. What is the most important is the donor base. In Sri Lanka nurtured in the traditions of Theravada Buddhism the donor base was easy to prepare. We had no difficulties with Christians and Hindus. For Muslims there are Fatwas in favour of donating eyes. But we always found them to be a reluctant group. But in predominantly Muslim countries, it is imperative that social workers should take up this issue, so those thousands may be helped. In all areas where attempts are made to procure comeas, it is important to have a day-and-night service available at short notice to collect any eyes offered. A trained technician with sterilised instruments to obtain eyes and blood sample must be available at a convenient location preferably in a large hospital. Even in places where the supply is infrequent, it is essential to have the readily-sterilised instruments to proceed to a donor site at short notice. To get eyes, general publicity in mass media alone is not sufficient. Such publicity makes people aware of the need for donor eyes and where a technician/doctor is available. What is more important is to canvass personally after a person has died For this purpose trained social workers may be employed, or the technician can do the motivation, as we do in Sri Lanka. Once eyes are removed, it is essential to pay careful attention to the appearance of the cadaver. It should not (and need not) cause any deformity as such event has a profound negative effect on the campaign. Many different preservation methods have been used over the years. Mc Carey-Kaufmann (MK) medium has been the standard for many years, and gives a life span of 4-5 days. The formula

  16. Heterogeneity and option pricing

    NARCIS (Netherlands)

    Benninga, Simon; Mayshar, Joram

    2000-01-01

    An economy with agents having constant yet heterogeneous degrees of relative risk aversion prices assets as though there were a single decreasing relative risk aversion pricing representative agent. The pricing kernel has fat tails and option prices do not conform to the Black-Scholes formula.

  17. Regulation of Pharmaceutical Prices

    DEFF Research Database (Denmark)

    Kaiser, Ulrich; Mendez, Susan J.; Rønde, Thomas

    On April 1, 2005, Denmark changed the way references prices, a main determinant of reimbursements for pharmaceutical purchases, are calculated. The previous reference prices, which were based on average EU prices, were substituted to minimum domestic prices. Novel to the literature, we estimate t...

  18. PUBLIC PROCUREMENT IN GHANA: THE IMPLEMENTATION CHALLENGES TO THE PUBLIC PROCUREMENT LAW 2003 (ACT 663

    Directory of Open Access Journals (Sweden)

    Ameyaw, Collins

    2012-08-01

    Full Text Available The purpose of this study was to identify various implementation bottlenecks to the Ghana Public Procurement Law 2003 (Act 663. The study adopted multiple research approaches, including; review of relevant literature, interviews and questionnaire survey of 49 District Assemblies and Metropolitan and Municipal Assemblies in the Ashanti and Brong Ahafo Regions of Ghana. The study identified low capacity of procurement professionals, low interaction between procurement entities and Public Procurement Authority (PPA, deliberate controlling of competition, non-compliance with provisions of the law, splitting of contracts into smaller lots, lack of funds and non-cooperativeness of suppliers, as the major challenges militating against the implementation of the Public Procurement Law.

  19. Networking for knowledge capacity building of procurement professionals in Ghana

    Directory of Open Access Journals (Sweden)

    Kissi Ernest

    2016-12-01

    Full Text Available The role of public procurement professionals in achieving value for money in public procurement activities is widely acknowledged around the globe. This has inspired the organisation of training programmes and workshops for procurement professionals, particularly those in developing countries in order to hone their knowledge and skills for proper management of government projects. This paper sought to explore the opportunities in networking for knowledge capacity building of procurement professionals in Ghana. The study adopted quantitative research methods for both data collection and analysis. The paper revealed that professional networking can offer procurement professionals the opportunity to acquire new knowledge from external professionals, know global trends about procurement practice, and obtain new information from other institutions about procurement. It is recommended that a platform that can support a network of procurement professionals in Ghana should be developed in order to ensure effective interaction and communication among procurement professionals for their capacity building.

  20. Application of Derivatives Market for Controlling Risks of Commodity Prices

    Directory of Open Access Journals (Sweden)

    Rasuolė Drazdauskienė

    2015-05-01

    Full Text Available The issue of raw milk procurement cost level and fluctuation which inhibits strengthening negotiating positions of dairy product fabricants and probability of them staying competitive in the European Union, is examined. Scientific literature that analyzes risks of staple prices is overviewed in the article. The paper provides statistical data representing the situation of Lithuania in contrast with European Union rates. Global usage of prospective transactions and their possible influence on price regulation are analyzed. After examining statistical data and academic literature, conclusions are provided.

  1. Value-based pricing

    OpenAIRE

    Netseva-Porcheva Tatyana

    2010-01-01

    The main aim of the paper is to present the value-based pricing. Therefore, the comparison between two approaches of pricing is made - cost-based pricing and value-based pricing. The 'Price sensitively meter' is presented. The other topic of the paper is the perceived value - meaning of the perceived value, the components of perceived value, the determination of perceived value and the increasing of perceived value. In addition, the best company strategies in matrix 'value-cost' are outlined. .

  2. Human resources needs for universal access to antiretroviral therapy in South Africa: A time and motion study

    NARCIS (Netherlands)

    J.A.C. Hontelez (Jan); M.L. Newell (Marie Louise); R.M. Bland (Ruth); K. Munnelly (Kristen); R.J. Lessells (Richard ); T. Bärnighausen (Till)

    2012-01-01

    textabstractBackground: Although access to life-saving treatment for patients infected with HIV in South Africa has improved substantially since 2004, treating all eligible patients (universal access) remains elusive. As the prices of antiretroviral drugs have dropped over the past years,

  3. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    Science.gov (United States)

    Nelson, E A S; Bloom, David E; Mahoney, Richard T

    2014-01-01

    The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. To determine realistic targets for VPA and VPB. Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs.

  4. Donor and procurement related issues in vascularized composite allograft transplantation.

    Science.gov (United States)

    McDiarmid, Sue V

    2013-12-01

    To understand the unique requirements of vascularized composite allograft (VCA) donation and procurement practices and the integral role of the established nationwide organ procurement organizations in organ procurement. The recent issuance of a Final Rule (July 2013) by the United States Secretary of Health that redefines VCAs as organs rather than tissues, opens up the potential to formalize policies and procedures, under the auspices of the Organ Procurement and Transplantation Network, that can improve VCA donation, procurement practices, develop allocation algorithms and provide transparent oversight. Improved VCA donation rates, procurement procedures and broader sharing nationwide of VCA donors will have important implications in advancing the emerging field of VCA transplantation.

  5. When to start antiretroviral therapy

    DEFF Research Database (Denmark)

    Lundgren, Jens D; Babiker, Abdel G; Gordin, Fred M

    2013-01-01

    Strategies for use of antiretroviral therapy (ART) have traditionally focused on providing treatment to persons who stand to benefit immediately from initiating the therapy. There is global consensus that any HIV+ person with CD4 counts less than 350 cells/μl should initiate ART. However, it rema...

  6. the moralities of antiretroviral treatment

    African Journals Online (AJOL)

    the moralities of antiretroviral treatment. Klaus Fiedler. AIDS - a moral issue. When HIV I AIDS was discovered in 1984 and began to spread all over the world, it was a moral ... may have to perform) and it has increased the number of working days lost due to attendance .... the other side, moral issues are addressed in detail.

  7. Upping The Emergency Management Ante: The Role Of Private Sector Collaboration In Emergency Management And Whether State Procurement And Emergency Management Laws Are Built To Collaborate

    Science.gov (United States)

    2016-03-01

    emergency exceptions allow the potential for bribery and kickback opportunities for public officials.164 States’ laws recognize this exception and...it is in these “no-bid” rapid emergency procurement situations that the aforesaid price-inflation, corruption, bribery and fraud vulnerabilities can

  8. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2010-01-01

    Aim: The aim of the paper is to present, analyse and identify learning from two case studies of innovative procurement in Facilities Management (FM) concerning the establishments of partnerships between clients and providers. Approach and methodology: A major study of FM best practice covering 36...... municipal buildings and sports facilities in parts of the city of Copenhagen. Each of the case studies has involved both the client and the provider side of the collaboration. The paper presents, compare and analyze the two cases regarding intentions, procurement methods, forms of collaborations...... strong requirements on the management style and company culture. Limitations of the research: The research is only based on two case studies, which obviously limits the possibility to generalize the results. Practical applications: The research presents two specific examples of innovative procurement...

  9. Higher Education Prices and Price Indexes. 1978 Supplement.

    Science.gov (United States)

    Halstead, D. Kent; Hickson, Lenel

    The 1978 supplement to the basic study, Higher Education Prices and Price Indexes, presents higher education price index data for fiscal years 1971 through 1978. A price index series measures the effects of price change, and price change only, on a fixed group of items. The indexes reported here measure price changes from 1967, the reference date.…

  10. Price strategy and pricing strategy: terms and content identification

    OpenAIRE

    Panasenko Tetyana

    2015-01-01

    The article is devoted to the terminology and content identification of seemingly identical concepts "price strategy" and "pricing strategy". The article contains evidence that the price strategy determines the direction, principles and procedure of implementing the company price policy and pricing strategy creates a set of rules and practical methods of price formation in accordance with the pricing strategy of the company.

  11. Exporter Price Premia?

    DEFF Research Database (Denmark)

    Jäkel, Ina Charlotte; Sørensen, Allan

    This paper provides new evidence on manufacturing firms' output prices: in Denmark, on average, exported varieties are sold at a lower price (i.e. a negative exporter price premium) relative to only domestically sold varieties. This finding stands in sharp contrast to previous studies, which have...... found positive exporter price premia. We also document that the exporter price premium varies substantially across products (both in terms of sign and magnitude). We show that in a standard heterogeneous firms model with heterogeneity in quality as well as production efficiency there is indeed no clear......-cut prediction on the sign of the exporter price premium. However, the model unambiguously predicts a negative exporter price premium in terms of quality-adjusted prices, i.e. prices per unit of quality. This prediction is broadly borne out in the Danish data: while the magnitude of the premium varies across...

  12. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2011-01-01

    A major study of facilities management best practice covering 36 cases from the Nordic countries in Europe shows, that the most outstanding examples of innovation in FM are initiated from the demand side and involves new forms of procurement with long term contracts. This paper considers in depth......-called operational partnerships with private providers concerning all municipal buildings and sports facilities in parts of a city. Each of the case studies has involved both the client and the provider side of the collaboration. The cases show that an essential element in a successful procurement and partnership...

  13. Sustainable Procurement in the United Nations

    DEFF Research Database (Denmark)

    Lund-Thomsen, Peter; Costa, Nives

    2011-01-01

    This paper deals with the integration of economic, social and environmental criteria into the purchasing practices of the United Nations (UN) system--also known as the UN engagement in sustainable procurement (SP). We argue that the debates about the pros and cons of the UN engaging in SP...... are highly contested among UN procurement officers and member states. However, so far the debate has mostly been based on assumptions about how the implementation of SP might affect developing country stakeholders. In fact, very few academic studies have been made of the economic, social and environmental...

  14. Federal Procurement Metrication Appropriateness and Methods.

    Science.gov (United States)

    1982-09-18

    8217D-R123 243 FEDERAL PROCUREMENT NETRICATION AiPPROPRIATENESS AND- i/i METHODS(U) SCIENCE MANAGEMENT CORP UASHINGTON DC M A COELLA 18 SEP 82 NRC-358i... Science Management Corporation FEDERAL PROCUREMENT METRICATION APPROPRIATENESS AND METHODS (FINAL REPORT) DTICSEL.C T ED fDISMhIUTION STATEMENT A LM...reflect the views of the U.S. Metric Board. Acce5Sion For NTTS GRA&I DTTC ’ri% Q is Diet Special Science Management CoRoration 1120 Connecticut Avenue

  15. Spare parts classification and procurement program

    International Nuclear Information System (INIS)

    Adlon, K.L.; Hassaballa, M.M.

    1986-01-01

    The cost benefits have been demonstrated for an integrated program, which is currently being implemented for two PWR stations with two 1100-MW units each. The component classification efforts reduced the number of safety-related components in several systems. Furthermore, the knowledge of the component specific function has contributed to the reduction of many safety-related parts per component, in addition to ensuring the procurement of parts to the correct safety level. The use of qualified commercial grade parts and components with their lower cost and reasonable procurement lead time compared to their 10 CFR 21 counterparts has a pronounced economic effect on the utility balance sheets

  16. Flexible procurement systems is key to supply chain sustainability

    Directory of Open Access Journals (Sweden)

    Surajit Bag

    2016-04-01

    Full Text Available Background: In this dynamic business environment, manufacturers are focusing primarily on delivery performance and competitive pricing to win orders. It is essential that manufacturers adopt flexible procurement systems (FPSs in such an uncertain environment for business sustainability. Objectives: The purpose of the study is to identify the elements of FPSs and model the interrelationships between elements of FPSs and, finally, to understand how FPSs are linked with supply chain sustainability. Method: Besides providing a brief conceptual review of FPSs, the study largely illustrates the use of an innovative multi-criteria decision-making approach called total interpretive structural modelling (TISM. Results: The total interpretive structural modelling–based model evaluates the causality and illustrates elements with interpretation of relations and suggests that bottom-level elements are vital for sustainability in FPSs and avert risks. Secondly, strategic sourcing is positively influencing supplier integration. Thirdly, supplier integration positively influences supplier responsiveness. Fourthly, skills of flexible procurement workforce positively influence supplier integration. Fifthly, it is found that supplier integration positively influences flexible transportation. The sixth finding suggests that supplier integration positively influences eco-friendly packaging. The seventh finding highlights that supplier integration positively influences ISO 14001 certifications. The eighth finding explains that supplier responsiveness positively influences customer satisfaction. It is also observed that flexible transport reduces operational cost and environmental costs. The second last finding explains eco-friendly packaging and reduction in environmental cost by careful selection of packing material and chemicals. Lastly, it is found that ISO 14001/environmental certifications reduce environmental costs by greening suppliers and pressurises them

  17. Flexible procurement systems is key to supply chain sustainability

    Directory of Open Access Journals (Sweden)

    Surajit Bag

    2016-01-01

    Full Text Available Background: In this dynamic business environment, manufacturers are focusing primarily on delivery performance and competitive pricing to win orders. It is essential that manufacturers adopt flexible procurement systems (FPSs in such an uncertain environment for business sustainability.Objectives: The purpose of the study is to identify the elements of FPSs and model the interrelationships between elements of FPSs and, finally, to understand how FPSs are linked with supply chain sustainability.Method: Besides providing a brief conceptual review of FPSs, the study largely illustrates the use of an innovative multi-criteria decision-making approach called total interpretive structural modelling (TISM.Results: The total interpretive structural modelling–based model evaluates the causality and illustrates elements with interpretation of relations and suggests that bottom-level elements are vital for sustainability in FPSs and avert risks. Secondly, strategic sourcing is positively influencing supplier integration. Thirdly, supplier integration positively influences supplier responsiveness. Fourthly, skills of flexible procurement workforce positively influence supplier integration. Fifthly, it is found that supplier integration positively influences flexible transportation. The sixth finding suggests that supplier integration positively influences eco-friendly packaging. The seventh finding highlights that supplier integration positively influences ISO 14001 certifications. The eighth finding explains that supplier responsiveness positively influences customer satisfaction. It is also observed that flexible transport reduces operational cost and environmental costs. The second last finding explains eco-friendly packaging and reduction in environmental cost by careful selection of packing material and chemicals. Lastly, it is found that ISO 14001/environmental certifications reduce environmental costs by greening suppliers and pressurises them to

  18. Pricing structures in US coal supply contracts

    Science.gov (United States)

    Kacker, Kanishka

    The subject of my dissertation is the study of coal procurement by electric utilities in the US over 2 decades, from 1979 to 2000. Energy markets are typically characterized by severe contracting problems. Buyers and sellers therefore employ various instruments, such as contract length or complex pricing arrangements, to restrict these problems. Relationship specific investment, wherein buyers make investments specific to their suppliers, has been advanced as a prominent explanation for contractual length. Investment decisions are however endogenous in length or pricing, making causal identification of the role of investment specificity difficult. In my first chapter, I attempt a resolution. I use the 1990 Clean Air Act Amendment as an exogenous shifter of the extent of relationship specific investment. A key feature of the Amendment's design helps me define a difference-in-difference model arguably free of the endogeneity issues discussed above. I find that the plants forced into switching - Phase I plants located in the US Midwest - are more likely to choose fixed price contracts than those that were not. Further they also write contracts of shorter terms, with the reduction being approximately 30%. Considerably little is known about the performance implications of contractual choices. These form the basis for Chapter 2. Here I find prices to be lower, by between 5% to 20% of the total transaction price, but the probability of renegotiation higher, under fixed price contracts than under escalator or cost-plus contracts. Contract choices appear consistent with a trade-off between establishing incentives ex-ante and lowering negotiation costs ex-post, with relationship specific investments in particular making such a trade-off compelling. Chapter 3 considers the regulatory environment these utilities were subject to. Both incentive based regulation as well as the restructuring of electricity generation are smaller in comparison to relationship specific investment

  19. BIM-Based E-Procurement: An Innovative Approach to Construction E-Procurement

    Directory of Open Access Journals (Sweden)

    António Aguiar Costa

    2015-01-01

    Full Text Available This paper presents an innovative approach to e-procurement in construction, which uses building information models (BIM to support the construction procurement process. The result is an integrated and electronic instrument connected to a rich knowledge base capable of advanced operations and able to strengthen transaction relationships and collaboration throughout the supply chain. The BIM-based e-procurement prototype has been developed using distinct existing electronic solutions and an IFC server and was tested in a pilot case study, which supported further discussions of the results of the research.

  20. BIM-Based E-Procurement: An Innovative Approach to Construction E-Procurement

    Science.gov (United States)

    2015-01-01

    This paper presents an innovative approach to e-procurement in construction, which uses building information models (BIM) to support the construction procurement process. The result is an integrated and electronic instrument connected to a rich knowledge base capable of advanced operations and able to strengthen transaction relationships and collaboration throughout the supply chain. The BIM-based e-procurement prototype has been developed using distinct existing electronic solutions and an IFC server and was tested in a pilot case study, which supported further discussions of the results of the research. PMID:26090518

  1. BIM-Based E-Procurement: An Innovative Approach to Construction E-Procurement.

    Science.gov (United States)

    Aguiar Costa, António; Grilo, António

    2015-01-01

    This paper presents an innovative approach to e-procurement in construction, which uses building information models (BIM) to support the construction procurement process. The result is an integrated and electronic instrument connected to a rich knowledge base capable of advanced operations and able to strengthen transaction relationships and collaboration throughout the supply chain. The BIM-based e-procurement prototype has been developed using distinct existing electronic solutions and an IFC server and was tested in a pilot case study, which supported further discussions of the results of the research.

  2. Regional Logistics of Procurement of the Ferrous Scrap by the Iron-and-Steel Companies of the Russian Federation

    Directory of Open Access Journals (Sweden)

    Tatiana Aleksandrovna Ivanova

    2017-03-01

    Full Text Available The article discusses the relevant problem of iron-and-steel companies saving on purchasing the scrap metal. The analysis of the current state of the ferrous scrap market in the Russian Federation, trends of its development, led the authors to an opportunity to reduce the cost for purchasing scrap trough the optimal distribution of the regions between Russian iron-and-steel companies where they purchase ferrous scrap. The optimization of the regional structure of the scrap procurement taking into account the regional volumes of its generation and consumption results from using the linear programming methods applying three variants of the problem statement: minimizing the total cost of the scrap delivery to the factory, minimizing the total cost of the scrap at the “export parity” price with delivery, minimizing the total cost of the scrap at the actual prices with delivery. The authors have developed software for performing the calculations. The source are the database of the JSC Russian Railways, which provides information about the transportation of the ferrous scrap between stations of the Russian Federation by railroad; railway rates guide between railway stations of the Russian Federation; statistical data on the prices for scrap metal of the type 3A in “export windows”; actual purchasing prices for the scrap of the 3A type for the range of separate companies of the Russian Federation for several years. As a result, the authors have obtained the optimal regional structure of scrap purchasing for customers in the Russian Federation. We have formulated the recommendations for individual companies regarding the optimal routes of the procurement with scrap. The study has confirmed the possibility to decrease expanses for purchasing the scrap metal for all iron-and-steel factories of the Russian Federation through the optimization of the regional structure of procurement. It is also has allowed to estimate the possibility to cut expenses

  3. Minimising the expectation value of the procurement cost in electricity markets based on the prediction error of energy consumption

    OpenAIRE

    Yamaguchi, Naoya; Hori, Maiya; Ideguchi, Yoshinari

    2018-01-01

    In this paper, we formulate a method for minimising the expectation value of the procurement cost of electricity in two popular spot markets: {\\it day-ahead} and {\\it intra-day}, under the assumption that expectation value of unit prices and the distributions of prediction errors for the electricity demand traded in two markets are known. The expectation value of the total electricity cost is minimised over two parameters that change the amounts of electricity. Two parameters depend only on t...

  4. Procurement strategies for combined multiorgan and composite tissues for transplantation.

    Science.gov (United States)

    Datta, Néha; Yersiz, Hasan; Kaldas, Fady; Azari, Kodi

    2015-04-01

    The purpose of this article is to identify the unique aspects of combined multiorgan and vascularized composite allograft (VCA) procurement from deceased donors and outline the steps essential for success. Transplantation of nonsolid organ composite tissues is becoming a viable option for reconstruction of massive tissue defects. With the United Network for Organ Sharing designation of VCAs as organs, placing them under the domain of the Organ Procurement and Transplantation Network, a systematic method for combined solid organ and VCA procurement is required. Several centers have reported experience with successful procurement strategies including sequential and simultaneous retrievals. The published literature describing donor screening, sequence of procurement with relation to solid organs and allocation is reviewed. With the 2013 classification of VCAs as organs, the Organ Procurement and Transplantation Network and United Network for Organ Sharing are better suited to aligning procurement and allocation policies. As VCA transplantation becomes more commonplace, protocol guidelines will ensure smooth integration with existing procurement infrastructure.

  5. GPP Webinar: Solar Procurement Templates and Tools for Higher Education

    Science.gov (United States)

    Green Power Partnership webinar on solar procurement for Higher Education which features various tools and templates that schools can use to shape and manage the solar procurement process to a successful outcome.

  6. BIM Implementation and Project Coordination In Design-Built Procurement

    NARCIS (Netherlands)

    Aibinu, Ajibade A.; Papadonikolaki, E.

    2016-01-01

    Various procurement methods have been proposed as being more appropriate for implementing BIM. Simultaneously, BIM implementation affects the project coordination. Whereas many approaches to BIM implementation have considered integrated procurement, not all are applicable to various local markets.

  7. Innovation public procurement in Russia: problems of institutional arrangements

    Directory of Open Access Journals (Sweden)

    Korytcev Maxim, A.

    2015-12-01

    Full Text Available The paper explores the problems of public procurement in innovation sphere in Russia, its institutional organization. In international practice, some strategies of innovation stimulation (by public procurement are developing. There is necessity to use more elements of these strategies in Russian National Procurement System. The active National Public Procurement System has no enough effective methods and instruments for stimulating innovation development now.

  8. Drug Pricing Reforms

    DEFF Research Database (Denmark)

    Kaiser, Ulrich; Mendez, Susan J.; Rønde, Thomas

    2015-01-01

    Reference price systems for prescription drugs have found widespread use as cost containment tools. Under such regulatory regimes, patients co-pay a fraction of the difference between pharmacy retail price of the drug and a reference price. Reference prices are either externally (based on drug...... prices in other countries) or internally (based on domestic drug prices) determined. In a recent study, we analysed the effects of a change from external to internal reference pricing in Denmark in 2005, finding that the reform led to substantial reductions in prices, producer revenues, and expenditures...... for patients and the health insurance system. We also estimated an increase in consumer welfare but the size effect depends on whether or not perceived quality differences between branded and other drugs are taken into account....

  9. Natural gas pricing

    International Nuclear Information System (INIS)

    Freedenthal, C.

    1993-01-01

    Natural gas pricing is the heart and soul of the gas business. Price specifically affects every phase of the industry. Too low a price will result in short supplies as seen in the mid-1970s when natural gas was scarce and in tight supply. To fully understand the pricing of this energy commodity, it is important to understand the total energy picture. In addition, the effect and impact of world and US economies, and economics in general are crucial to understanding natural gas pricing. The purpose of this presentation will be to show the parameters going into US natural gas pricing including the influence of the many outside industry factors like crude oil and coal pricing, market drivers pushing the gas industry, supply/demand parameters, risk management for buyers and sellers, and other elements involved in pricing analysis

  10. PRICES IN COMPETITIVE SYSTEM

    Directory of Open Access Journals (Sweden)

    VADUVA MARIA

    2017-08-01

    Full Text Available Regularities of competitive market determine rules for determining prices and their dynamics. Orientation prices to competition (competitive pricing is the strategy most frequently used in countries with market economies and especially for exports. Moreover, in an economy dominated by market competition it cannot be ignored without certain risks the prices resulting from competition between products bidders. Companies that use this type of strategy seek to maintain a level of prices linked to that charged by other competitors (or exporting producers generally no longer covering production costs or demand, relying on the assumption that the average market price is a reasonable basis of costs. But the way how practical guidance and reporting to the competition in every price strategy, will be determined by the company's market position, by the available power and enjoyed prestige, objectives and prospects of its market share etc. according to these elements, there may be several versions of pricing strategies oriented to competitors.

  11. Greening Operations Management: An Online Sustainable Procurement Course for Practitioners

    Science.gov (United States)

    Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian

    2009-01-01

    In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…

  12. Effects of Procurement Related Factors on Construction Project ...

    African Journals Online (AJOL)

    Several Literatures in construction management support the view that procurements have impacts on project performance. Aim of this study is to investigate the effects of procurement related factors of procurement selection criteria, tendering methods and variation orders on project performance. Purpose of the study is to ...

  13. Procurement maturity, alignment and performance: a Dutch hospital case comparison.

    NARCIS (Netherlands)

    Plomp, M.; Batenburg, R.

    2009-01-01

    Procurement is an important supporting business function, with which competitive advantage can potentially be achieved. In this paper, the relation between maturity and alignment in procurement on the one hand, and procurement performance on the other, is investigated in the case study setting of

  14. 41 CFR 101-26.602-4 - Procurement of coal.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  15. PROCUREMENT ADJUDICATION AND THE RIGHTS OF ...

    African Journals Online (AJOL)

    UKZN

    In the last few years there has been increasing interest in the process of public procurement. The emphasis is often on the flaws of the tender processes, such as corruption and disregard for the rule of law, and there is seldom sufficient attention paid to the consequences of the flawed tenders on the rights of the beneficiaries ...

  16. 10 CFR 603.1300 - Procurement contract.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms... the more detailed definition of the term “contract” at 48 CFR 2.101. ...

  17. EFFECTS OF PROCUREMENT RELATED FACTORS ON ...

    African Journals Online (AJOL)

    Osondu

    2013-03-04

    Mar 4, 2013 ... of the market, government policies, government as major client, regulating feasibility, technology feasibility amongst other variables. All these above factors can influence the selection of an appropriate procurement method that can also affect project performance. Tendering Method Related Factors.

  18. 76 FR 34064 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-06-10

    ... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed..., Party, Birthday, Sports-Theme, 8pc. NPA: Winston-Salem Industries for the Blind, Inc., Winston-Salem, NC...

  19. 49 CFR 19.44 - Procurement procedures.

    Science.gov (United States)

    2010-10-01

    ... specific features of “brand name or equal” descriptions that bidders are required to meet when such items...) The procurement, which is expected to exceed the small purchase threshold, specifies a “brand name... and Attachment A. (4) Section 1241(b)(1) of 46 U.S.C. and 46 CFR part 381, Cargo Preference—U.S. Flag...

  20. Issues in organ procurement, allocation, and transplantation.

    Science.gov (United States)

    Nierste, Deborah

    2013-01-01

    Organ transplantation extends lives and improves health but presents complex ethical dilemmas for nurses caring for donors, recipients, and their families. This article overviews organ procurement and allocation, discusses ethical dilemmas in transplantation, and offers strategies from professional and biblical perspectives for coping with moral distress and maintaining compassionate care.

  1. 77 FR 65365 - Procurement List; Additions

    Science.gov (United States)

    2012-10-26

    ... 10800, 1421 Jefferson Davis Highway, Arlington, Virginia 22202-3259. FOR FURTHER INFORMATION CONTACT...-8506) in connection with the products proposed for addition to the Procurement List. End of...: 6650-00-NIB-0053--Flat Top 8x35, Trifocal, Polycarbonate, Clear NSN: 6650-00-NIB-0054--Lenses...

  2. Online Reverse Auctions for Procurement of Services

    NARCIS (Netherlands)

    U.L. Radkevitch (Uladzimir)

    2008-01-01

    textabstractOnline reverse auctions, in which a buyer seeks to select a supplier and suppliers compete for contracts by bidding online, revolutionized corporate procurement early this century. Shortly after they had been pioneered by General Electric, many companies rushed to adopt reverse auctions

  3. 13 CFR 143.36 - Procurement.

    Science.gov (United States)

    2010-01-01

    ... appropriate analysis to determine the most economical approach. (5) To foster greater economy and efficiency... member of his immediate family, (iii) His or her partner, or (iv) An organization which employs, or is.... Consideration should be given to consolidating or breaking out procurements to obtain a more economical purchase...

  4. 45 CFR 1183.36 - Procurement.

    Science.gov (United States)

    2010-10-01

    ... appropriate analysis to determine the most economical approach. (5) To foster greater economy and efficiency... member of his immediate family, (iii) His or her partner, or (iv) An organization which employs, or is.... Consideration should be given to consolidating or breaking out procurements to obtain a more economical purchase...

  5. 44 CFR 13.36 - Procurement.

    Science.gov (United States)

    2010-10-01

    ... consolidating or breaking out procurements to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the... partner, or (iv) An organization which employs, or is about to employ, any of the above, has a financial...

  6. 21 CFR 1403.36 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... appropriate analysis to determine the most economical approach. (5) To foster greater economy and efficiency... member of his immediate family, (iii) His or her partner, or (iv) An organization which employs, or is.... Consideration should be given to consolidating or breaking out procurements to obtain a more economical purchase...

  7. 22 CFR 135.36 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees..., (iii) His or her partner, or (iv) An organization which employs, or is about to employ, any of the... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where...

  8. 45 CFR 1157.36 - Procurement.

    Science.gov (United States)

    2010-10-01

    ... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees..., (iii) His or her partner, or (iv) An organization which employs, or is about to employ, any of the... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where...

  9. 24 CFR 85.36 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... consolidating or breaking out procurements to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the... partner, or (iv) An organization which employs, or is about to employ, any of the above, has a financial...

  10. 45 CFR 602.36 - Procurement.

    Science.gov (United States)

    2010-10-01

    ... appropriate analysis to determine the most economical approach. (5) To foster greater economy and efficiency... immediate family, (iii) His or her partner, or (iv) An organization which employs, or is about to employ.... Consideration should be given to consolidating or breaking out procurements to obtain a more economical purchase...

  11. 45 CFR 1174.36 - Procurement.

    Science.gov (United States)

    2010-10-01

    ... appropriate analysis to determine the most economical approach. (5) To foster greater economy and efficiency... member of his immediate family, (iii) His or her partner, or (iv) An organization which employs, or is.... Consideration should be given to consolidating or breaking out procurements to obtain a more economical purchase...

  12. 28 CFR 66.36 - Procurement.

    Science.gov (United States)

    2010-07-01

    ... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees..., (iii) His or her partner, or (iv) An organization which employs, or is about to employ, any of the... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where...

  13. 10 CFR 600.236 - Procurement.

    Science.gov (United States)

    2010-01-01

    ... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees..., (iii) His or her partner, or (iv) An organization which employs, or is about to employ, any of the... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where...

  14. 29 CFR 97.36 - Procurement.

    Science.gov (United States)

    2010-07-01

    ... consolidating or breaking out procurements to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the... partner, or (iv) An organization which employs, or is about to employ, any of the above, has a financial...

  15. 49 CFR 18.36 - Procurement.

    Science.gov (United States)

    2010-10-01

    ... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees..., (iii) His or her partner, or (iv) An organization which employs, or is about to employ, any of the... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where...

  16. Pre-commercial procurement : regulatory effectiveness?

    NARCIS (Netherlands)

    Apostol, Anca Ramona

    2014-01-01

    Is public procurement of research and development (‘R&D’) services the key to European Union (‘EU’)’s sustainable welfare? Is it being regulated in accordance with economic prescripts for effectiveness? Is the regulatory and policy setting clear and comprehensive in order to stimulate a widespread

  17. 76 FR 40341 - Procurement List; Additions

    Science.gov (United States)

    2011-07-08

    ...-Wagner-O'Day Act (41 U.S.C. 46- 48c) in connection with the products and services proposed for addition...: Janitorial Services, Mustang Armed Force Reserve Center (AFRC), Mustang, OK. Norman Armed Force Reserve... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions...

  18. 78 FR 68823 - Procurement List Deletions

    Science.gov (United States)

    2013-11-15

    ...'Day Act (41 U.S.C. 8501-8506) in connection with the products and services deleted from the... Center, Chicago, IL. Service Type/Location: Janitorial/Custodial Service, Gamelin USARC, 10 Asylum Road... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List Deletions...

  19. 77 FR 75616 - Procurement List; Additions

    Science.gov (United States)

    2012-12-21

    ... the objectives of the Javits-Wagner-O'Day Act (41 U.S.C. 8501-8506) in connection with the services... Center, Detroit, MI Service Type/Location: Contract Closeout Service, Architect of the Capitol... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions...

  20. 78 FR 17641 - Procurement List Additions

    Science.gov (United States)

    2013-03-22

    ...-Wagner-O'Day Act (41 U.S.C. 8501-8506) in connection with the products and service proposed for addition.../Location: Information Technology (IT) Service, Defense Manpower Data Center (DMDC), Defense Human Resources... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List Additions...

  1. 78 FR 63967 - Procurement List; Additions

    Science.gov (United States)

    2013-10-25

    ... objectives of the Javits-Wagner-O'Day Act (41 U.S.C. 8501-8506) in connection with the services proposed for... Procurement List: Services Service Type/Location: Base Supply Center Service, Georgia National Guard, Clay... Road, Commerce City, CO NPA: North Metro Community Services for Developmentally Disabled, Westminster...

  2. 78 FR 41916 - Procurement List Addition

    Science.gov (United States)

    2013-07-12

    ... the objectives of the Javits-Wagner-O'Day Act (41 U.S.C. 8501-8506) in connection with the service..., El Paso Service Processing Center, 8915 Montana Avenue, El Paso, TX. NPA: Mavagi Enterprises, Inc... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List Addition...

  3. 78 FR 53734 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-08-30

    ...: Committee for Purchase From People Who Are Blind or Severely Disabled, 1401 S Clark Street, Suite 10800..., Telephone: (703) 603-7740, Fax: (703) 603-0655, or email [email protected]One.gov . SUPPLEMENTARY... Procurement List for production by the nonprofit agency listed: Products: NSN: 6645-00-NIB-0141--Clock, Wall...

  4. public procurement, governance and economic growth

    African Journals Online (AJOL)

    GRACE

    development of African countries. The paper proffers sound public procurement practices as a panacea to the ailing economies of Africa's developing countries as this would help curb corruption, reduce wastage, enhance the effectiveness of government spending, ensure infrastructural development, enhance the welfare of ...

  5. Decentralized Procurement in Light of Strategic Inventories

    DEFF Research Database (Denmark)

    Arya, Anil; Frimor, Hans; Mittendorf, Brian

    2014-01-01

    and confirmed to be a multifaceted choice. This paper complements existing studies by detailing the trade-offs in the centralization versus decentralization decision in light of firm's decision to cede procurement choices to its individual devisions can help moderate inventory levels and provide a natural salve...

  6. 22 CFR 228.40 - Local procurement.

    Science.gov (United States)

    2010-04-01

    ... businesses, dealers or producers, with payment normally being in the currency of the cooperating country... with subpart F of this part, local procurement is eligible for USAID financing only in the following... the value of the transaction is estimated not to exceed the local currency equivalent of $100,000...

  7. 76 FR 55882 - Procurement List; Addition

    Science.gov (United States)

    2011-09-09

    ... sale and delivery. This will maximize employment for individuals with the most barriers to competitive.... Therefore, employment opportunities for people who are blind or severely disabled are maximized through the... PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Addition AGENCY: Committee for Purchase From...

  8. 22 CFR 145.44 - Procurement procedures.

    Science.gov (United States)

    2010-04-01

    ... competition. (ii) Requirements which the bidder/offeror must fulfill and all other factors to be used in... limitation and is to be awarded without competition or only one bid or offer is received in response to a... than the apparent low bidder under a sealed bid procurement. (5) A proposed contract modification...

  9. 14 CFR 1274.505 - Procurement procedures.

    Science.gov (United States)

    2010-01-01

    ... the bidder/offeror must fulfill and all other factors to be used in evaluating bids or proposals. (iii... awarded without competition or only one bid or offer is received in response to a solicitation. (3) The... the apparent low bidder under a sealed bid procurement. (5) A proposed contract modification changes...

  10. 34 CFR 74.44 - Procurement procedures.

    Science.gov (United States)

    2010-07-01

    ... which the bidder/offeror must fulfill and all other factors to be used in evaluating bids or proposals... without competition or only one bid or offer is received in response to a solicitation. (3) The... bidder under a sealed bid procurement. (5) A proposed contract modification changes the scope of a...

  11. 38 CFR 49.44 - Procurement procedures.

    Science.gov (United States)

    2010-07-01

    ...) Requirements, which the bidder/offeror must fulfill, and all other factors to be used in evaluating bids or... received in response to a solicitation. (3) The procurement, which is expected to exceed the small purchase... contract modification changes the scope of a contract or increases the contract amount by more than the...

  12. 14 CFR 1260.144 - Procurement procedures.

    Science.gov (United States)

    2010-01-01

    ... factors to be used in evaluating bids or proposals. (iii) A description, whenever practicable, of... be awarded without competition or only one bid or offer is received in response to a solicitation. (3... apparent low bidder under a sealed bid procurement. (5) A proposed contract modification changes the scope...

  13. 7 CFR 3019.44 - Procurement procedures.

    Science.gov (United States)

    2010-01-01

    ... other factors to be used in evaluating bids or proposals. (iii) A description, whenever practicable, of... without competition or only one bid or offer is received in response to a solicitation. (3) The... bidder under a sealed bid procurement. (5) A proposed contract modification changes the scope of a...

  14. 22 CFR 518.44 - Procurement procedures.

    Science.gov (United States)

    2010-04-01

    ... must fulfill and all other factors to be used in evaluating bids or proposals. (iii) A description... without competition or only one bid or offer is received in response to a solicitation. (3) The... bidder under a sealed bid procurement. (5) A proposed contract modification changes the scope of a...

  15. 22 CFR 226.44 - Procurement procedures.

    Science.gov (United States)

    2010-04-01

    ... factors to be used in evaluating bids or proposals. (iii) A description, whenever practicable, of... is to be awarded without competition or only one bid or offer is received in response to a... the apparent low bidder under a sealed bid procurement. (5) A proposed contract modification changes...

  16. 28 CFR 70.44 - Procurement procedures.

    Science.gov (United States)

    2010-07-01

    ... which the bidder/offeror must fulfill and all other factors to be used in evaluating bids or proposals... is to be awarded without competition or only one bid or offer is received in response to a... the apparent low bidder under a sealed bid procurement. (5) A proposed contract modification changes...

  17. 15 CFR 14.44 - Procurement procedures.

    Science.gov (United States)

    2010-01-01

    ... fulfill and all other factors to be used in evaluating bids or proposals. (iii) A description, whenever... without competition or only one bid or offer is received in response to a solicitation. (3) The... the apparent low bidder under a sealed bid procurement. (5) A proposed contract modification changes...

  18. 78 FR 73504 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-12-06

    ... Logistics Support Detachment, Undisclosed Location*, Ft. Belvoir, VA. NPA: MVLE, Inc., Springfield, VA. Contracting Activity: Directorate of Contracting Procurement Logistics Support Detachment, Fort Belvoir, VA.... Lineback, Director, Business Operations. [FR Doc. 2013-29139 Filed 12-5-13; 8:45 am] BILLING CODE 6353-01-P ...

  19. Organ procurement from executed prisoners in China.

    Science.gov (United States)

    Sharif, A; Singh, M Fiatarone; Trey, T; Lavee, J

    2014-10-01

    Organ procurement from executed prisoners in China is internationally condemned, yet this practice continues unabated in 2014. This is despite repeated announcements from Chinese authorities that constructive measures have been undertaken to conform to accepted ethical standards. While there is unanimous agreement on the unethical nature of using organs from executed prisoners, due to its limitations on voluntary and informed consent, there is insufficient coverage of forced organ procurement from prisoners of conscience without consent. Strategies to influence positive change in China over the last few decades have failed to bring this practice to an end. While organ donation and transplantation services in China have undergone considerable structural changes in the last few years, fundamental attempts to shift practice to ethically sourced organs have floundered. In this article, we discuss the organ trade in China, reflect upon organ procurement from executed prisoners (including both capital prisoners and prisoners of conscience) and provide an overview of contradictory Chinese efforts to halt forced organ procurement from executed prisoners. Finally, we highlight current actions being taken to address this issue and offer comprehensive recommendations to bring this ethically indefensible practice to an immediate end. © Copyright 2014 The American Society of Transplantation and the American Society of Transplant Surgeons.

  20. How Effective Affirmative Tender Procurements Assist Women ...

    African Journals Online (AJOL)

    How Effective Affirmative Tender Procurements Assist Women Entrepreneurs Operating in Small Business in South Africa. ... Gender and Behaviour ... The South African Women Entrepreneurship Network was also established as a buying basket to lobby all women to speak in one voice when conducting businesses.

  1. Airline Price Discrimination

    OpenAIRE

    Stacey, Brian

    2015-01-01

    Price discrimination enjoys a long history in the airline industry. Borenstein (1989) discusses price discrimination through frequent flyer programs from 1985 as related to the Piedmont-US Air merger, price discrimination strategies have grown in size and scope since then. From Saturday stay over requirements to varying costs based on time of purchase, the airline industry is uniquely situated to enjoy the fruits of price discrimination.

  2. An Analysis of Bid Evaluation Procedures of Contemporary Models for Procurement in Pakistan

    Science.gov (United States)

    2016-12-01

    one company . In this procedure, contracting agency does not have to announce or advertise the procurement (Turkish Public Procurement Law , 2002...prosper them according to the related laws in Turkish public procurement system. This rule can only be used to support the local companies . There is...Commonwealth Procurement Rules. (2014). Public Procurement Law of Australia . Consult Australia . (2015). Economic benefits of better procurement

  3. Optimal combined purchasing strategies for a risk-averse manufacturer under price uncertainty

    Directory of Open Access Journals (Sweden)

    Qiao Wu

    2015-09-01

    Full Text Available Purpose: The purpose of our paper is to analyze optimal purchasing strategies when a manufacturer can buy raw materials from a long-term contract supplier and a spot market under spot price uncertainty. Design/methodology/approach: This procurement model can be solved by using dynamic programming. First, we maximize the DM’s utility of the second period, obtaining the optimal contract quantity and spot quantity for the second period. Then, maximize the DM’s utility of both periods, obtaining the optimal purchasing strategy for the first period. We use a numerical method to compare the performance level of a pure spot sourcing strategy with that of a mixed strategy. Findings: Our results show that optimal purchasing strategies vary with the trend of contract prices. If the contract price falls, the total quantity purchased in period 1 will decrease in the degree of risk aversion. If the contract price increases, the total quantity purchased in period 1 will increase in the degree of risk aversion. The relationship between the optimal contract quantity and the degree of risk aversion depends on whether the expected spot price or the contract price is larger in period 2. Finally, we compare the performance levels between a combined strategy and a spot sourcing strategy. It shows that a combined strategy is optimal for a risk-averse buyer. Originality/value: It’s challenging to deal with a two-period procurement problem with risk consideration. We have obtained results of a two-period procurement problem with two sourcing options, namely contract procurement and spot purchases. Our model incorporates the buyer’s risk aversion factor and the change of contract prices, which are not addressed in early studies.

  4. Regulation of Pharmaceutical Prices

    DEFF Research Database (Denmark)

    Kaiser, Ulrich; Méndez, Susan J.; Rønde, Thomas

    2014-01-01

    Reference prices constitute a main determinant of patient health care reimbursement in many countries. We study the effects of a change from an "external" (based on a basket of prices in other countries) to an "internal" (based on comparable domestic products) reference price system. We find...

  5. Regulation of Pharmaceutical Prices

    DEFF Research Database (Denmark)

    Kaiser, Ulrich; Méndez, Susan J.; Rønde, Thomas

    Reference prices constitute a main determinant of patient health care reimbursement in many countries. We study the effects of a change from an "external" (based on a basket of prices in other countries) to an "internal" (based on comparable domestic products) reference price system. We find...

  6. Price control and macromarketing

    Directory of Open Access Journals (Sweden)

    Kancir Rade

    2003-01-01

    Full Text Available Price control at macro level is part of integral macro marketing strategic control system, or more precisely, part of social marketing mix control. Price impact is direct, if it is regarded in the context of needs satisfaction, and indirect, within the context of resource allocation. These two patterns of price impact define control mechanism structuring. Price control in sense of its direct impact at process of need satisfaction should comprise qualitative and quantitative level of needs satisfaction at a given price level and its structure, informational dimension of price and different disputable forms of corporate pricing policies. Control of price allocation function is based at objectives of macro marketing system management in the area of resource allocation and the role of price as allocator in contemporary market economies. Control process is founded, on one hand, at theoretical models of correlation between price and demand in different market structures, and on the other hand, at complex limits that price as allocator has, and which make whole control process even more complex because of reduction of the degree of determinism in functioning of contemporary economic systems. Control of price allocation function must be continuous and dynamic process if it is to provide for convergence with environmental changes and if it is to provide for placing control systems at micro marketing levels in the function of socially valid objectives.

  7. Simulating Price-Taking

    Science.gov (United States)

    Engelhardt, Lucas M.

    2015-01-01

    In this article, the author presents a price-takers' market simulation geared toward principles-level students. This simulation demonstrates that price-taking behavior is a natural result of the conditions that create perfect competition. In trials, there is a significant degree of price convergence in just three or four rounds. Students find this…

  8. OPTIMIZING HOTEL DYNAMIC PRICES

    Directory of Open Access Journals (Sweden)

    A. M. Bandalouski

    2016-01-01

    Full Text Available An approach to solvе a problem of determining optimal dynamic prices for hotel rooms is suggested. It includes selection of input parameters for the succeeding mathematical analysis, disaggregation of the demand into several categories, demand forecasting, simulation of demand- price relations, and a mathematical programming model for price optimization.

  9. Forward Commitment Procurement : A practical methodology that helps to manage risk in procuring innovative goods and services

    NARCIS (Netherlands)

    Whyles, G.; Meerveld, H. van; Nauta, N.J.

    2015-01-01

    The Forward Commitment Procurement (FCP) is a Public Procurement of Innovation (PPI) methodology. It was specifically designed to both provide a practical methodology for procurers to follow and to manage the perceived risk of the customer and supplier in innovation investments. The paper describes

  10. Analyzing the effects of past prices on reference price formation

    OpenAIRE

    van Oest, R.D.; Paap, R.

    2004-01-01

    textabstractWe propose a new reference price framework for brand choice. In this framework, we employ a Markov-switching process with an absorbing state to model unobserved price recall of households. Reference prices result from the prices households are able to remember. Our model can be used to learn how many prices observed in the past are used for reference price formation. Furthermore, we learn to what extent households have sufficient price knowledge to form an internal reference price...

  11. The problems of accountable and analytical procuring of enterprise management

    Directory of Open Access Journals (Sweden)

    Kovalova Tatiana Volodymyrivna

    2016-02-01

    Full Text Available This article investigated main aspects of accountable and analytical procuring of enterprise management. It was found essence of accountable and analytical procuring of enterprise management, purpose, functions and tasks. It was determined main elements and essence of accountable and analytical information taking into consideration needs of modern management. In the article are exposed structural elements of accountable and analytical procuring. It was formed conceptual approaches of building accountable and analytical procuring of enterprise management. It was analyzed main problems of improving accountable and analytical informational procuring of taking managerial decisions with the aim of solving economic problems due to current situation of national economy.

  12. Internet resource pricing models

    CERN Document Server

    Xu, Ke; He, Huan

    2013-01-01

    This brief guides the reader through three basic Internet resource pricing models using an Internet cost analysis. Addressing the evolution of service types, it presents several corresponding mechanisms which can ensure pricing implementation and resource allocation. The authors discuss utility optimization of network pricing methods in economics and underline two classes of pricing methods including system optimization and entities' strategic optimization. The brief closes with two examples of the newly proposed pricing strategy helping to solve the profit distribution problem brought by P2P

  13. Value-based pricing

    Directory of Open Access Journals (Sweden)

    Netseva-Porcheva Tatyana

    2010-01-01

    Full Text Available The main aim of the paper is to present the value-based pricing. Therefore, the comparison between two approaches of pricing is made - cost-based pricing and value-based pricing. The 'Price sensitively meter' is presented. The other topic of the paper is the perceived value - meaning of the perceived value, the components of perceived value, the determination of perceived value and the increasing of perceived value. In addition, the best company strategies in matrix 'value-cost' are outlined. .

  14. Cost-savings accruable to removing value added tax from antiretrovirals in the South African private health sector

    Directory of Open Access Journals (Sweden)

    Varsha Bangalee

    2017-10-01

    Full Text Available Background: Despite the important and essential role that medicines play in any society, all medicines, including those identified as essential, are uniformly subjected to 14% value added tax (VAT, regardless of their therapeutic value in the private healthcare sector of South Africa. The aim of this article is to demonstrate the potential cost-saving attained from the removal of VAT from the private sector pricing of essential medicines, using antiretroviral treatment as an example. Methods: An empirical analysis was undertaken to illustrate the potential cost-saving achieved by removing VAT from the Single Exit Price and the dispensing fee of essential medicines. This outcome was demonstrated by applying the methodology to an adult fixed dose combination 1st line antiretroviral regimen as well as to a group of 3rd line antiretroviral medicines. Results: The potential saving for the lowest priced generic and originator 1st line antiviral regimen accrued to ZAR 693.84 and ZAR 1085.04 over a year respectively. Regarding the 3rd line antiretroviral drugs, results yielded an annual saving of ZAR 1678.68 (darunavir, ZAR5741.04 (maraviroc and ZAR 159.48 (rilpivirine. Conclusions: Lobbying for the removal of VAT from the supply chain of medicines should be intensified. Policy development to monitor and recover lost government revenue through the removal of taxes should be explored.

  15. Poverty and price transmission

    DEFF Research Database (Denmark)

    Elleby, Christian

    A key parameter determining the welfare impact from a world market shock is the transmission elasticity which measures the average domestic response to an international price change. Many studies have estimated price transmission elasticities for a large number of countries but the variation...... in these estimates is so far largely unexplored. This paper proposes a model which explains a country's domestic price response to world market shocks in terms of its demand structure. The model delivers two testable predictions; price transmission is increasing in per capita food expenditure and in income...... inequality. The empirical analysis of price changes during the food crises confirms these predictions with a caveat. I find significant inverse U-shaped relationships between domestic food price growth in 2007-8 and 2010-11 and per capita food expenditure. Unequal countries also experienced higher price...

  16. EIA and green procurement: Opportunities for strengthening their coordination

    International Nuclear Information System (INIS)

    Uttam, Kedar; Faith-Ell, Charlotta; Balfors, Berit

    2012-01-01

    EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: ► This paper identifies opportunities to link EIA and green procurement. ► Pre-decision phase of EIA could be appropriate for planning green procurement. ► Future research should investigate the mechanism for establishing the link.

  17. HIV drug resistance early warning indicators in cohorts of individuals starting antiretroviral therapy between 2004 and 2009: World Health Organization global report from 50 countries.

    Science.gov (United States)

    Bennett, Diane E; Jordan, Michael R; Bertagnolio, Silvia; Hong, Steven Y; Ravasi, Giovanni; McMahon, James H; Saadani, Ahmed; Kelley, Karen F

    2012-05-01

    The World Health Organization developed a set of human immunodeficiency virus drug resistance (HIVDR) early warning indicators (EWIs) to assess antiretroviral therapy clinic and program factors associated with HIVDR. EWIs are monitored by abstracting data routinely recorded in clinical records, and the results enable clinics and program managers to identify problems that should be addressed to minimize preventable emergence of HIVDR in clinic populations. As of June 2011, 50 countries monitored EWIs, covering 131 686 patients initiating antiretroviral treatment between 2004 and 2009 at 2107 clinics. HIVDR prevention is associated with patient care (appropriate prescribing and patient monitoring), patient behavior (adherence), and clinic/program management efforts to reduce treatment interruptions (follow up, retention on first-line ART, procurement and supply management of antiretroviral drugs). EWIs measure these factors and the results have been used to optimize patient and population treatment outcomes.

  18. Pricing and availability of some essential child specific medicines in Odisha.

    Science.gov (United States)

    Swain, Trupti Rekha; Rath, Bandana; Dehury, Suhasini; Tarai, Anjali; Das, Priti; Samal, Rajashree; Samal, Satyajit; Nayak, Harshavardhan

    2015-01-01

    Continuous availability of affordable medicines in appropriate formulations is essential to reduce morbidity and mortality in children. Odisha an eastern Indian state records very high mortality of children. The study aims at documenting the availability and prices paid for purchasing essential child-specific medicines. The survey of 34 essential medicines was conducted in six randomly selected districts of Odisha. Data were collected from medicine outlets of the public, private, and other sector (Nongovernmental Organization [NGO]/mission sectors) of six randomly selected districts, using WHO/Health Action International medicine price collection methodology. For each medicine surveyed, data were collected on the highest and lowest-priced formulations available in each facility. Both public sector and other sector health facilities procure only one brand of medicines, mean percentage availability of medicines being 17% and 21.8%, respectively. In the private sector, the mean percentage availability of the high and lowest-priced medicines for a particular drug product was 10.8% and 38.5%, respectively. The public sector procurement price is 48% lower than international reference prices. In the private sector, high-priced, and low-priced products are sold at 1.83 and 1.46 times the international reference price, respectively. Substantial price variation was observed for some medicines across individual outlets. Medicines were found to cost 2.08 times their international reference price in NGO/mission sector facilities. The availability of children's medicines in public sector facilities of Odisha state is poor. Medicines for children cost relatively high in both private and NGO sectors compared to the international reference price. The availability medicines should be improved on an urgent basis to improve access of medicines for children of Odisha.

  19. Customer Markets and Price Sensitivity.

    OpenAIRE

    Nishimura, Kiyohiko G

    1989-01-01

    This paper investigates the behavior of prices in customer markets of the Phelps-Winter type under uncertainty. It is shown that the responsiveness of prices to short-run demand and cost changes depends crucially on whether the marginal customer is price risk averse or price risk loving. If he is price risk averse (loving), then the customer market price is less (more) flexible than the monopoly price. Competition makes the customer market price more rigid (flexible) if the marginal customer ...

  20. An overview of European good practices in public procurement

    Directory of Open Access Journals (Sweden)

    Ada POPESCU

    2016-06-01

    Full Text Available Public procurement has always been a major source of corruption in Europe, as acknowledged by national and European officials, by NGOs and by representatives of civil society. Too often, public procurement serves the personal interests of corrupt officials rather than the best interest of the community. During the last decade, anti-corruption efforts have increasingly focused on public procurement corruption. Most European countries, including European Union members, have tried to eliminate public procurement corruption by implementing new legal rules to ensure compliance with public procurement standards and by prosecuting offenders. After surveying a variety of good practices for eliminating corruption in public procurement in Europe, this paper concludes that the new rules have produced mixed results, with the most unfavourable outcomes occurring in Central and Eastern European countries where public procurement corruption is more virulent than elsewhere in Europe.

  1. Transportation Service Procurement Bid Construction Problem from Less Than Truckload Perspective

    Directory of Open Access Journals (Sweden)

    Fang Yan

    2018-01-01

    Full Text Available This paper presents mixed integer programming for a transportation service procurement bid construction problem from a less than full truckload perspective, in which the bidders (carriers generate their best bid (package using a bundled price to maximize their utility and increase the chance of winning the business. The models are developed from both the carriers and shippers perspectives to establish a relationship between the quoted price and the likelihood of winning to assist the carriers in balancing the potential benefits and the possibility of winning the bid. An intelligent algorithm based on Particle Swarm Optimization is then designed to solve the proposed model and hypothetical data sets are used to test the effectiveness and efficiency of the proposed model and algorithm.

  2. E-PROCUREMENT AS AN INSTRUMENT FOR HOTEL SUPPLY CHAIN MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Lidija Pulevska IVANOVSKA

    2007-06-01

    Full Text Available The flow of goods, services, and information in the hotel industry, should be designed in a way that enables efficient transformation of raw materials into finished products or services with values. Procurement technology plays a vital role in the hotel business, because hotels usually purchase a large quantity of supplies for maintaining daily operations and quality. Today, a major goal of a hotel’s supply chain management is to efficiently apply information technology to its procurement systems. Moving away from traditional offline purchase processing to online sequencing presents significant savings, improved productivity and enhanced operational efficiencies. Better communication between hotels and suppliers and support services may provide more favourable price offerings and related activities for the hotels customers. This article elaborates the e-procurement as a very useful instrument for the hotel supply chain management following the approach of Kothari et al.

  3. Managing EEE part standardisation and procurement

    Science.gov (United States)

    Serieys, C.; Bensoussan, A.; Petitmangin, A.; Rigaud, M.; Barbaresco, P.; Lyan, C.

    2002-12-01

    This paper presents the development activities in space components selection and procurement dealing with a new data base tool implemented at Alcatel Space using TransForm softwaa re configurator developed by Techform S.A. Based on TransForm, Access Ingenierie has devv eloped a software product named OLG@DOS which facilitate the part nomenclatures analyses for new equipment design and manufacturing in term of ACCESS data base implementation. Hi-Rel EEE part type technical, production and quality information are collected and compiled usingproduction data base issued from production tools implemented for equipment definition, description and production based on Manufacturing Resource Planning (MRP II Control Open) and Parametric Design Manager (PDM Work Manager). The analysis of any new equipment nomenclature may be conducted through this means for standardisation purpose, cost containment program and management procurement activities as well as preparation of Component reviews as Part Approval Document and Declared Part List validation.

  4. Particularities of the Public Procurement Contentious

    Directory of Open Access Journals (Sweden)

    Vasilica Negruţ

    2013-05-01

    Full Text Available Abstract: The paper with the above mentioned title approaches an issue current not only for juridical research, but also for practical activities. This study resumes an issue approached by other authors as well, but highlighting some particulars of the contentious business of public acquisitions using analysis, observation and case study. Thus, based on the regulations prior to coming into force of the Emergency Ordinance no. 34/2006, I have performed a brief analysis of the means availab legality of a procedure of awarding the public procurement contract. At the same time, in this study we aim at clarifying the aspects related to the legal nature of the documents prior to concluding the publi contracts used by the contracting authority and also the legal conditions applicable to public procurement contracts concluded following the awarding procedure.

  5. Collaborative procurement for developing a sustainable campus

    Science.gov (United States)

    Nifa, Faizatul Akmar Abdul; Rahim, Syukran Abdul; Rani, Wan Nurul Mardiah Wan Mohd; Ismail, Mohd. Noorizhar

    2016-08-01

    It is particularly challenging to achieve sustainability in campus universities, where a high volume of users and activities has made it more imperative to promote green buildings that reduce energy and water consumption while having a minimal carbon footprint. At present, the frameworks for sustainable campus have seldom focused on the project procurement method which would improve construction team integration in developing the physical aspect of campus development. Therefore, in response to that challenge, this paper investigates how the delivery team, responsible for the design and construction of a project, can be integrated to work together more efficiently and more using the collaborative procurement method known as partnering. This paper reports part of a previous research and sets the base for ongoing research on the critical factors in partnering for sustainable campus development. The outcome or result of this study will meet and support the requirement for construction, maintenance, and operation process for universities towards sustainable building/campus in the future.

  6. Corruption and Incompetence in Public Procurement

    OpenAIRE

    Estache, Antonio; Foucart, Renaud

    2016-01-01

    We study a game where inefficiencies in public procurement managed by politicians comefrom two sources: corruption (moral hazard) and incompetence (adverse selection). We characterizethe respective impact of judicial and accounting courts on the cost effectiveness ofprocurement and the level of corruption. Although improving the quality of both courts mattersas a direct deterrent of corruption, it may also indirectly decrease the quality of the poolof politicians and hence deteriorates the co...

  7. ORIGINAL ARTICLES Estimation of adult antiretroviral treatment ...

    African Journals Online (AJOL)

    ORIGINAL ARTICLES. 661. Estimation of adult antiretroviral treatment coverage in. South Africa. Muhammad Aarif Adam, Leigh F Johnson. Death notification statistics confirm that AIDS is dramatically affecting mortality in South Africa.1 Demographic and epidemiological models suggest that antiretroviral treatment is.

  8. Antiretroviral therapy during the neonatal period

    African Journals Online (AJOL)

    2015-05-04

    May 4, 2015 ... Initiation of combination antiretroviral therapy (cART) at 6–9 weeks of age has been shown to reduce early infant mortality by 76% and HIV progression by 75% compared with cART deferred until clinical or CD4 criteria were met.1 In the landmark Children with HIV Early Antiretroviral. Therapy (CHER) trial ...

  9. Accessing antiretroviral therapy for children: Caregivers' voices ...

    African Journals Online (AJOL)

    Despite efforts to scale up access to antiretroviral therapy (ART), particularly at primary health care (PHC) facilities, antiretroviral therapy (ART) continues to be out of reach for many human immunodeficiency virus (HIV)-positive children in sub-Saharan Africa. In resource limited settings decentralisation of ART is required to ...

  10. Combined antiretroviral and anti- tuberculosis drug resistance ...

    African Journals Online (AJOL)

    these epidemics, many challenges remain.[3] Antiretroviral and anti-TB drug resistance pose considerable threats to the control of these epidemics.[4,5]. The breakdown in HIV/TB control within prisons is another emerging threat.[6,7] We describe one of the first reports of combined antiretroviral and anti-TB drug resistance ...

  11. Preliminary investigation of adherence to antiretroviral therapy ...

    African Journals Online (AJOL)

    Treatment of HIV with highly active antiretroviral therapy (HAART) has resulted in declining morbidity and mortality rates from HIV-associated diseases, but concerns regarding access and adherence are growing. To determine the adherence level and the reasons for non-adhering to antiretroviral therapy (ART) among ...

  12. Innovation, Procurement and Construction Industry Development

    Directory of Open Access Journals (Sweden)

    Geard de Valence

    2010-12-01

    Full Text Available The implications for analysis of innovation in construction of theoretical developments in industrial organisation are considered in this research, as an attempt to outline a new approach to construction innovation incorporating the ideas found in knowledge based, technology centred models. The paper firstly summarises characteristics of the construction industry, focusing on their effects on innovation, before surveying some of the ideas about the sources of innovation and the expansion and application of knowledge. Construction can be seen as an industry with limited scope for knowledge externalities, where the procurement methods used by the industry’s clients do not pay for innovation. The following discussion uses recent developments in the research on the economics of innovation and industrial organization theory, such as research intensity and the endogenous sunk costs in competitive, fragmented, low research intensity industries. The effects on R&D of procurement methods and on industry structure are discussed, with a focus on the appropriability of innovations and the role of the client on the Heathrow Terminal 5 project. The paper concludes that the procurement methods used for building and construction projects appears to be a determining factor in the level of innovation in the construction industry

  13. Target Price Accuracy

    Directory of Open Access Journals (Sweden)

    Alexander G. Kerl

    2011-04-01

    Full Text Available This study analyzes the accuracy of forecasted target prices within analysts’ reports. We compute a measure for target price forecast accuracy that evaluates the ability of analysts to exactly forecast the ex-ante (unknown 12-month stock price. Furthermore, we determine factors that explain this accuracy. Target price accuracy is negatively related to analyst-specific optimism and stock-specific risk (measured by volatility and price-to-book ratio. However, target price accuracy is positively related to the level of detail of each report, company size and the reputation of the investment bank. The potential conflicts of interests between an analyst and a covered company do not bias forecast accuracy.

  14. Value-based procurement of medical devices: Application to devices for mechanical thrombectomy in ischemic stroke.

    Science.gov (United States)

    Trippoli, Sabrina; Caccese, Erminia; Marinai, Claudio; Messori, Andrea

    2018-03-01

    In the acute ischemic stroke, endovascular devices have shown promising clinical results and are also likely to represent value for money, as several modeling studies have shown. Pharmacoeconomic evaluations in this field, however, have little impact on the procurement of these devices. The present study explored how complex pharmacoeconomic models that evaluate effectiveness and cost can be incorporated into the in-hospital procurement of thrombectomy devices. As regards clinical modeling, we extracted outcomes at three months from randomized trials conducted for four thrombectomy devices, and we projected long-term results using standard Markov modeling. In estimating QALYs, the same model was run for the four devices. As regards economic modeling, we firstly estimated for each device the net monetary benefit (NMB) per patient (threshold = $60,000 per QALY); then, we simulated a competitive tender across the four products by determining the tender-based score (on a 0-to-100 scale). Prices of individual devices were obtained from manufacturers. Extensive sensitivity testing was applied to our analyses. For the four devices (Solitaire, Trevo, Penumbra, Solumbra), QALYs were 1.86, 1.52, 1,79, 1.35, NMB was $101,824, $83,546, $101,923, $69,440, and tender-based scores were 99.70, 43.43, 100, 0, respectively. Sensitivity analysis confirmed findings from base-case. Our results indicate that, in the field of thrombectomy devices, incorporating the typical tools of cost-effectiveness into the processes of tenders and procurement is feasible. Bridging the methodology of cost-effectiveness with the every-day practice of in-hospital procurement can contribute to maximizing the health returns that are generated by in-hospital expenditures for medical devices. Copyright © 2018 Elsevier B.V. All rights reserved.

  15. The Informing Needs of Procurement Officers in Israel

    Directory of Open Access Journals (Sweden)

    Yahel Giat

    2017-06-01

    Full Text Available Aim/Purpose: To develop and introduce a questionnaire that investigates the informing needs, information-seeking behavior, and supplier selection of procurement officers in Israel. The questionnaire’s internal consistency reliability is given. Additionally, we describe the demographic description of the procurement officers in Israel. Background: Procurement science is an important field that affects firms’ profits in the private sector and is significant to growth, innovation, sustainability, and welfare in the public sector. There is little research about the informing needs of procurement officers in general and particularly in Israel. Methodology: A quantitative questionnaire that is sent to all the procurement officers in Israel’s procuring association. Contribution: The questionnaire that is developed in this paper may be used by other researchers and practitioners to evaluate the information needs of procurement officers. Findings: The typical procurement officer is male, with a bachelor degree and is digitally proficient. Recommendations for Practitioners: The procuring side can use the questionnaire to develop better tools for obtaining information efficiently. The supplying side can use this knowledge to improve its exposure to potential customers and address its customer’s needs better. Recommendation for Researchers: The questionnaire can address theoretical questions such as how digital literacy affects the procuring process and provide empirical findings about active research areas such as supplier selection and information-seeking behavior. Future Research: Future research will examine the relationship between the various variables and demographic features to understand why specific information needs and information-seeking behaviors arise.

  16. Pricing public transport services

    OpenAIRE

    Jansson, Jan Owen; Holmgren, Johan; Ljungberg, Anders

    2015-01-01

    This chapter aims at outlining pricing policy for public transport that maximizes the social surplus, that is, the sum of the producer surplus and the consumer surplus, while internalizing possible system-external costs. It starts by presenting the door-to-door transport cost as a key concept in price theory for public transport, and then first principles of optimal pricing valid for all modes of public transport are laid down. These principles are applied to urban (short-distance) public tra...

  17. Pricing of new vaccines

    OpenAIRE

    Lee, Bruce Y; McGlone, Sarah M

    2010-01-01

    New vaccine pricing is a complicated process that could have substantial long-standing scientific, medical and public health ramifications. Pricing can have a considerable impact on new vaccine adoption and, thereby, either culminate or thwart years of research and development and public health efforts. Typically, pricing strategy consists of the following eleven components: (1) Conduct a target population analysis; (2) Map potential competitors and alternatives; (3) Construct a vaccine targe...

  18. 2016 Status Report on Major Equipment Procurement

    Directory of Open Access Journals (Sweden)

    David Perry

    2017-09-01

    Full Text Available The Department of National Defence made some progress in procurement in 2016 despite obstacles that included a continued drop in spending, the advent of a new federal Liberal government and uncertainty over the outcome of the Defence Policy Review. Four trends affected defence acquisitions in 2016. These include an ongoing slippage in recapitalizing the Canadian Armed Forces, some encouraging moves made on the shipbuilding and fighter jet files, mixed progress on implementing the 2014 Defence Procurement Strategy, and uncertainty over the Defence Policy Review. It is also too early to tell how the Trudeau government’s Policy on Results, known as the “deliverology” approach, will play out for defence procurement. However, Budget 2016’s major focus was not on defence, and it shifted some funding for capital equipment to a new endpoint of 2045. This suggests that delay in the overall defence procurement program continues. While the Liberals kept their pledge to make investment in the Royal Canadian Navy a priority, they also made good last year on a negative promise – not to purchase the F-35 stealth fighter bomber. However, further slowing things is the Liberals’ refusal to launch a competition to replace it until the Defence Policy Review is published. The government has made this situation more fraught with its intention to buy 18 Boeing Super Hornet fighter jets as interim aircraft, since Liberal policy requires the Royal Canadian Air Force to be capable of meeting both NORAD’s and NATO’s operational needs simultaneously. Prior to the release of the new defence policy, both the interim and permanent fighter aircraft projects lacked adequate funding. They were among several large projects that have been approved, but have not yet moved to the contract stage, and whose budgets were inadequate to move forward. Adding to this mix is the fact that a government-wide effort initiated in 2014 to streamline the defence procurement

  19. Alternative pricing methodologies

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    With the increased interest in competitive market forces and growing recognition of the deficiencies in current practices, FERC and others are exploring alternatives to embedded cost pricing. A number of these alternatives are discussed in this chapter. Marketplace pricing, discussed briefly here, is the subject of the next chapter. Obviously, the pricing formula may combine several of these methodologies. One utility of which the authors are aware is seeking a price equal to the sum of embedded costs, opportunity costs, line losses, value of service, FERC's percentage adder formula and a contract service charge

  20. Modeling Asset Price Dynamics

    Directory of Open Access Journals (Sweden)

    Ranasinghe P. K. C. Malmini

    2008-09-01

    Full Text Available We model the price prediction in Sri Lankan stock market using Ising model and some recent developments in statistical physics techniques. In contrast to usual agent-models, the influence does not flow inward from the surrounding neighbors to the centre, but spreads outward from the center to the neighbors. Monte Carlo simulations were used to study this problem. The analysis was based on All share price index, Milanka price index in Colombo Stock Exchange and Simulated Price Process. The monthly and daily influences of the above indices to the Sri Lankan economy were also investigated. The model thus describes the spread of opinions traders.

  1. Determinants of contractor pricing strategy

    OpenAIRE

    Moses, O. Douglas

    1988-01-01

    This paper investigates pricing strategies used by major defense contractors. Two pricing strategies are identified and discussed: penetration, which calls for a relatively low initial price followed by little reduction in price over time, and skimming, which calls for a relatively high initial price coupled with greater reduction in price over time. It is argued that contractor pricing strategy will depend on features of the defense program under consideration and featur...

  2. Availability, price and affordability of cardiovascular medicines: a comparison across 36 countries using WHO/HAI data.

    Science.gov (United States)

    van Mourik, Maaike S M; Cameron, Alexandra; Ewen, Marg; Laing, Richard O

    2010-06-09

    The global burden of cardiovascular disease (CVD) continues to rise. Successful treatment of CVD requires adequate pharmaceutical management. The aim was to examine the availability, pricing and affordability of cardiovascular medicines in developing countries using the standardized data collected according to the World Health Organization/Health Action International methodology. The following medicines were included: atenolol, captopril, hydrochlorothiazide, losartan and nifedipine. Data from 36 countries were analyzed. Outcome measures were percentage availability, price ratios to international reference prices and number of day's wages needed by the lowest-paid unskilled government worker to purchase one month of chronic treatment. Patient prices were adjusted for inflation and purchasing power, procurement prices only for inflation. Data were analyzed for both generic and originator brand products and the public and private sector and summarized by World Bank Income Groups. For all measures, there was great variability across surveys. The overall availability of cardiovascular medicines was poor (mean 26.3% in public sector, 57.3% private sector). Procurement prices were very competitive in some countries, whereas others consistently paid high prices. Patient prices were generally substantially higher than international references prices; some countries, however, performed well. Chronic treatment with anti-hypertensive medication cost more than one day's wages in many cases. In particular when monotherapy is insufficient, treatment became unaffordable. The results of this study emphasize the need of focusing attention and financing on making chronic disease medicines accessible, in particular in the public sector. Several policy options are suggested to reach this goal.

  3. Optimal Sizing of Energy Storage Systems for the Energy Procurement Problem in Multi-Period Markets under Uncertainties

    Directory of Open Access Journals (Sweden)

    Ryusuke Konishi

    2018-01-01

    Full Text Available In deregulated electricity markets, minimizing the procurement costs of electricity is a critical problem for procurement agencies (PAs. However, uncertainty is inevitable for PAs and includes multiple factors such as market prices, photovoltaic system (PV output and demand. This study focuses on settlements in multi-period markets (a day-ahead market and a real-time market and the installation of energy storage systems (ESSs. ESSs can be utilized for time arbitrage in the day-ahead market and to reduce the purchasing/selling of electricity in the real-time market. However, the high costs of an ESS mean the size of the system needs to be minimized. In addition, when determining the size of an ESS, it is important to identify the size appropriate for each role. Therefore, we employ the concept of a “slow” and a “fast” ESS to quantify the size of a system’s role, based on the values associated with the various uncertainties. Because the problem includes nonlinearity and non-convexity, we solve it within a realistic computational burden by reformulating the problem using reasonable assumptions. Therefore, this study identifies the optimal sizes of ESSs and procurement, taking into account the uncertainties of prices in multi-period markets, PV output and demand.

  4. Relating price strategies and price-setting practices

    NARCIS (Netherlands)

    Ingenbleek, P.T.M.; Lans, van der I.A.

    2013-01-01

    Purpose - This article addresses the relationship between price strategies and price-setting practices. The first derive from a normative tradition in the pricing literature and the latter from a descriptive tradition. Price strategies are visible in the market, whereas price-setting practices are

  5. Intranational Price Convergence and Price Stickiness

    DEFF Research Database (Denmark)

    Bergman, Ulf Michael; Heebøll, Christian; Hansen, Niels Lynggaard

    2017-01-01

    We show that estimates of the half-life of deviations from LOOP are biased when not taking into account the precision when aggregating over types of goods. Using a comprehensive dataset with monthly price data for 124 homogeneous products across regions in Denmark over the period 1997–2010 we find...... a large positive aggregation bias. On average, we find that the half-life is 8.4 months when taking the bias into account compared to 28.7 months when applying the standard method. The heterogeneity in estimated half-life can be explained by price stickiness, distance between regions and whether the good...

  6. Procurement challenges in the South African public sector

    Directory of Open Access Journals (Sweden)

    Intaher M. Ambe

    2012-11-01

    Full Text Available This article reports on an exploration of challenges experienced in the field of procurement within the South African public sector. To institute procurement best practices, a supply chain management system was adopted in South Africa in 2003. The procurement process was granted constitutional status and has been used to address past inequitable policies and practices. It promotes aims which are, arguably, secondary to the primary aim of procurement. For the exploration, a conceptual analytical approach was employed and some of the key guiding pillars of public procurement in South Africa divulged. The challenges restraining effective and efficient implementation of public procurement are also revealed. The article concludes by recommending the development of competency through customised (separate training materials and programmes, the involvement of stakeholders in the bidding process and the employment of good strategic sourcing practices.

  7. Corporate Social Responsibility and Sustainability in Danish Public Procurement

    DEFF Research Database (Denmark)

    Andrecka, Marta

    2017-01-01

    understand the continuously developing concepts of SPP, as well as to identify the drivers and barriers that promote or hinder its further implementation. This article firstly deals with the relationship between the concepts of sustainability, Corporate Social Responsibility (CSR) and public procurement....... Secondly, as Denmark has been known as a pioneer in sustainable development, including implementation of it in public purchasing this article focuses on recent developments in the areas of CSR and sustainable public procurement in Denmark, and analyses relevant Danish Public Procurement Complaints Board......The new EU Procurement Directives reinforced the importance of sustainable development by facilitating the strategic use of public procurement to achieve broader societal goals and as such offer significant new opportunities for sustainable public procurement. The task of today is to better...

  8. The global pediatric antiretroviral market: analyses of product availability and utilization reveal challenges for development of pediatric formulations and HIV/AIDS treatment in children

    Directory of Open Access Journals (Sweden)

    Jambert Elodie

    2010-10-01

    Full Text Available Abstract Background Important advances in the development and production of quality-certified pediatric antiretroviral (ARV formulations have recently been made despite significant market disincentives for manufacturers. This progress resulted from lobbying and innovative interventions from HIV/AIDS activists, civil society organizations, and international organizations. Research on uptake and dispersion of these improved products across countries and international organizations has not been conducted but is needed to inform next steps towards improving child health. Methods We used information from the World Health Organization Prequalification Programme and the United States Food and Drug Administration to describe trends in quality-certification of pediatric formulations and used 7,989 donor-funded, pediatric ARV purchase transactions from 2002-2009 to measure uptake and dispersion of new pediatric ARV formulations across countries and programs. Prices for new pediatric ARV formulations were compared to alternative dosage forms. Results Fewer ARV options exist for HIV/AIDS treatment in children than adults. Before 2005, most pediatric ARVs were produced by innovator companies in single-component solid and liquid forms. Five 2-in1 and four 3-in-1 generic pediatric fixed-dose combinations (FDCs in solid and dispersible forms have been quality-certified since 2005. Most (67% of these were produced by one quality-certified manufacturer. Uptake of new pediatric FDCs outside of UNITAID is low. UNITAID accounted for 97-100% of 2008-2009 market volume. In total, 33 and 34 countries reported solid or dispersible FDC purchases in 2008 and 2009, respectively, but most purchases were made through UNITAID. Only three Global Fund country recipients reported purchase of these FDCs in 2008. Prices for pediatric FDCs were considerably lower than liquids but typically higher than half of an adult FDC. Conclusion Pediatric ARV markets are more fragile than

  9. The global pediatric antiretroviral market: analyses of product availability and utilization reveal challenges for development of pediatric formulations and HIV/AIDS treatment in children.

    Science.gov (United States)

    Waning, Brenda; Diedrichsen, Ellen; Jambert, Elodie; Bärnighausen, Till; Li, Yun; Pouw, Mieke; Moon, Suerie

    2010-10-17

    Important advances in the development and production of quality-certified pediatric antiretroviral (ARV) formulations have recently been made despite significant market disincentives for manufacturers. This progress resulted from lobbying and innovative interventions from HIV/AIDS activists, civil society organizations, and international organizations. Research on uptake and dispersion of these improved products across countries and international organizations has not been conducted but is needed to inform next steps towards improving child health. We used information from the World Health Organization Prequalification Programme and the United States Food and Drug Administration to describe trends in quality-certification of pediatric formulations and used 7,989 donor-funded, pediatric ARV purchase transactions from 2002-2009 to measure uptake and dispersion of new pediatric ARV formulations across countries and programs. Prices for new pediatric ARV formulations were compared to alternative dosage forms. Fewer ARV options exist for HIV/AIDS treatment in children than adults. Before 2005, most pediatric ARVs were produced by innovator companies in single-component solid and liquid forms. Five 2-in1 and four 3-in-1 generic pediatric fixed-dose combinations (FDCs) in solid and dispersible forms have been quality-certified since 2005. Most (67%) of these were produced by one quality-certified manufacturer. Uptake of new pediatric FDCs outside of UNITAID is low. UNITAID accounted for 97-100% of 2008-2009 market volume. In total, 33 and 34 countries reported solid or dispersible FDC purchases in 2008 and 2009, respectively, but most purchases were made through UNITAID. Only three Global Fund country recipients reported purchase of these FDCs in 2008. Prices for pediatric FDCs were considerably lower than liquids but typically higher than half of an adult FDC. Pediatric ARV markets are more fragile than adult markets. Ensuring a long-term supply of quality, well

  10. Development of modified rational buyer auction for procurement of ancillary services utilizing participation matrix

    International Nuclear Information System (INIS)

    Jamalzadeh, R.; Ardehali, M.M.; Rashidinejad, M.

    2008-01-01

    The rational buyer auction is based on a simultaneous auction that is the redesigned auction mechanism for ancillary services by the California independent system operator (CAISO). The incentive for the rational buyer auction is CAISO's intent to adopt a common sense rule of substituting higher-quality lower-cost services for lower-quality higher-cost services, when it results in reduced total procurement cost. For the purposes of designing a desirable auction where the minimum cost for the objective function as well as prevention of price reversal are achieved, either the payment cost in marginal pricing auction must be lowered or price reversal in rational buyer auction must be avoided. The objectives of this study are (a) to develop a newly proposed 'modified rational buyer' auction that does not allow price reversal and (b) to propose and validate a solution procedure that is based on participation matrix and discrete programming. The validation of the proposed solution procedure is accomplished through examination of two case studies available in the literature. Based on the first case study data, it is shown that the newly developed modified rational buyer auction avoids price reversal occurrence, while the total payment of ISO is increased by 5.8%, as compared with rational buyer auction. Also in comparison with marginal pricing auction, the ISO payment is lowered by 38.8%, when the newly developed modified rational buyer auction is utilized. For future work, it is recommended that the application of the modified rational buyer auction to joint dispatch of energy and ancillary services is investigated. (author)

  11. Price learning during grocery shopping

    DEFF Research Database (Denmark)

    Jensen, Birger Boutrup

    Many attempts have been made to measure consumers' price knowledge for groceries. However, the results have varied considerably and conflict with results of reference price research. This is the first study to examine price knowledge before, during, and after store visit, thus enabling a study...... of what consumers learn about prices during grocery shopping. Three measures of price knowledge corresponding to different levels of price information processing were applied. Results indicate that price learning does take place and that episodic price knowledge after store exit is far more widespread...... than expected. Consequently, a new view of how consumer price knowledge evolves during grocery shopping is presented....

  12. Petroleum: Price trends

    International Nuclear Information System (INIS)

    Babusiaux, Denis; Pierru, Axel

    2010-01-01

    The Organization of Petroleum-Exporting Countries (OPEC), some political leaders and financiers have mainly attributed the price spike of oil in 2008 - followed by a just as spectacular drop in prices - to the speculative moves made by financial investors on the futures market instead of to market fundamentals

  13. Assessing Asset Pricing Anomalies

    NARCIS (Netherlands)

    W.A. de Groot (Wilma)

    2017-01-01

    markdownabstractOne of the most important challenges in the field of asset pricing is to understand anomalies: empirical patterns in asset returns that cannot be explained by standard asset pricing models. Currently, there is no consensus in the academic literature on the underlying causes of

  14. Price Discrimination in Academic Journals.

    Science.gov (United States)

    Joyce, Patrick; Merz, Thomas E.

    1985-01-01

    Analysis of price discrimination (charging different prices to different customers for same product) for 89 academic journals in 6 disciplines reveals: incidence of price discrimination rose between 1974 and 1984, increase in mean institutional (library) subscription price exceeded increase in mean individual subscription price. Journal list…

  15. Economic risks of the system of state and municipal procurement

    Directory of Open Access Journals (Sweden)

    Belokrylova Olga, S.

    2015-12-01

    Full Text Available In the paper the audit of economic risks at all stages of procurement for state and municipal needs from both customers and bidders is carried out on the basis of the implementation of the integrated approach . Stages in the procurement under a single contract system, which is characterized by the high economic risks are planning, supplier selection, conclusion and execution of the contract. A number of the measures according to the localization of economic risks are offered, in particular the implementation of compliance programs, which institutionalize the compliance by the organization, anti-corruption legislation; increasing qualification of specialists in public procurement and increased control through centralization of procurement.

  16. Australian Naval Procurement Cycles: Lessons for Other Small Countries

    National Research Council Canada - National Science Library

    Hall, Peter; Wylie, Robert

    2008-01-01

    Defence procurement agencies in smaller countries face a difficult challenge when seeking to acquire new weapons systems that are either intrinsically complex or idiosyncratically tailored to local needs...

  17. THE EFFECTIVENESS OF BUDGET ALLOCATION IN PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Irina Yu. Fedorova

    2015-01-01

    Full Text Available This article deals with the problem of budget allocation in the state order inRussia. Assesses the effectiveness of the financial mechanism of the public procurement business entities, purchasing activities are regulated by Federal Law №44-FZ and №223-FZ. The dynamics of financing the procurement process and reveal its features by using the most common methods of procurement through competitive bidding and without bidding. Identifies the causes of inefficient spending budget as a result of the non-competitive procurement methods by certain categories of business entities. 

  18. Critical factors for sustainable food procurement in zoological collections.

    Science.gov (United States)

    Hanson, Jonathan H

    2015-01-01

    Food procurement can play an important role in sustainable food supply chain management by zoos, linking organizational operations to the biodiversity conservation and sustainability mission of zoological collections. This study therefore examines the critical factors that shape sustainable food procurement in zoo and aquariums. Using a web-based survey data was collected from 41 members of the British and Irish Association of Zoos and Aquariums (BIAZA). This included information on the sustainable food procurement practices of these institutions for both their human and animal food supply chains, as well as profile information and data on the factors contributing to and inhibiting sustainable procurement practices. Zoological collections operated by charities, and those with a certified sustainability standard, were found to have significantly higher levels of sustainable food procurement. Zoos and aquariums whose human food operations were not contracted to an external party were also found to have significantly higher levels of sustainable food procurement in their human food supply chain. The most important drivers of sustainable food procurement were cost savings, adequate financial support and improved product quality. The highest ranking barriers were higher costs, other issues taking priority and a lack of alternative suppliers. The results suggest that a number of critical factors shape sustainable food procurement in zoological collections in the British Isles. Financial factors, such as cost savings, were important considerations. The significance of mission-related factors, such as charity status, indicated that core values held by zoos and aquariums can also influence their food procurement practices. © 2015 Wiley Periodicals, Inc.

  19. Challenges of public procurement in EU funded projects

    Directory of Open Access Journals (Sweden)

    Marko Šostar

    2017-01-01

    Full Text Available Membership in the European Union implies adjustment of EU projects to the rules of Structural Funds, but also adoption of legal regulations, thus influencing the process of implementation of the public procurement in EU funded projects. Each successful applicant who expressed the need for procurement of goods, services and works of a certain value, must respect the principles of public procurement. Irregularities in the procurement process can lead to the failure of returning the EU funds even several years after the end of the project. Therefore, the knowledge and proper implementation of public procurement is the main precondition for the correct implementation of each project. In order to obtain information about the current absorption capacity of the public procurement liable parties, and to identify key obstacles that stakeholders face in procurement procedures, the research was conducted by surveying 30 entities that are subject of public procurement in Croatia. Research results imply the poor quality of public procurement in the implemented projects, which often results in financial corrections, disapproving project reports, etc.

  20. Price Formation by Bargaining and Posted Prices

    NARCIS (Netherlands)

    Kultti, K.K.

    1997-01-01

    We study markets with two types of agents. Sellers have an indivisible good for sale, and their reservation value is zero. Buyers are randomly matched with sellers, and they value the good at unity. Sellers may be matched with any positive number of buyers, and they may choose to determine the price

  1. Oil prices and the stock prices of alternative energy companies

    International Nuclear Information System (INIS)

    Henriques, Irene; Sadorsky, Perry

    2008-01-01

    Energy security issues coupled with increased concern over the natural environment are driving factors behind oil price movements. While it is widely accepted that rising oil prices are good for the financial performance of alternative energy companies, there has been relatively little statistical work done to measure just how sensitive the financial performance of alternative energy companies are to changes in oil prices. In this paper, a four variable vector autoregression model is developed and estimated in order to investigate the empirical relationship between alternative energy stock prices, technology stock prices, oil prices, and interest rates. Our results show technology stock prices and oil prices each individually Granger cause the stock prices of alternative energy companies. Simulation results show that a shock to technology stock prices has a larger impact on alternative energy stock prices than does a shock to oil prices. These results should be of use to investors, managers and policy makers. (author)

  2. Value based pricing: the least valued pricing strategy

    OpenAIRE

    Hoenen, Bob

    2017-01-01

    Pricing has been one of the least researched topics in marketing, although within these pricing strategies: cost-plus pricing is considered as the leading pricing strategy worldwide. Why should companies use such an unprofitable strategy, where fighting for a higher market share due to low prices is more a rule than exception? VBP is one of the most underestimated strategies by organizations. The definition of VBP is: 'value pricing applies to products that have the potential of being differe...

  3. Green Component Procurement Collaboration for Improving Supply Chain Management in the High Technology Industries: A Case Study from the Systems Perspective

    Directory of Open Access Journals (Sweden)

    Min-Ren Yan

    2016-01-01

    Full Text Available The impacts of high technology industries have been growing increasingly to technological innovations and global economic developments, while the concerns in sustainability are calling for facilitating green materials and cleaner production in the industrial value chains. Today’s manufacturing companies are not striving for individual capacities but for the effective working with green supply chains. However, in addition to environmental and social objectives, cost and economic feasibility has become one of the most critical success factors for improving supply chain management with green component procurement collaboration, especially for the electronics OEM (original equipment manufacturing companies whose procurement costs often make up a very high proportion of final product prices. This paper presents a case study from the systems perspective by using System Dynamics simulation analysis and statistical validations with empirical data. Empirical data were collected from Taiwanese manufacturing chains—among the world’s largest manufacturing clusters of high technology components and products—and their global green suppliers to examine the benefits of green component procurement collaborations in terms of shared costs and improved shipping time performance. Two different supply chain collaboration models, from multi-layer ceramic capacitor (MLCC and universal serial bus 3.0 (USB 3.0 cable procurements, were benchmarked and statistically validated. The results suggest that the practices of collaborative planning for procurement quantity and accurate fulfillment by suppliers are significantly related to cost effectiveness and shipping time efficiency. Although the price negotiation of upstream raw materials for the collaborative suppliers has no statistically significant benefit to the shipping time efficiency, the shared cost reduction of component procurement is significantly positive for supply chain collaboration among green

  4. EXAMINATION OF ETHICAL PROCUREMENT THROUGH ENTERPRISE EXAMPLES

    Directory of Open Access Journals (Sweden)

    Beáta Sz. G. Pató

    2016-06-01

    Full Text Available Today’s business world is affected by the 21st century’s processes, like globalization, fluent online attendance, digitalization and their direct consequence depersonalisation. The authors are motivated by these facts and want to vivify the „old fashioned” correct business models and find the indispensable parameter of the well-functioning economy, in one word today’s equivalent of „honorable gentlemen”. The assumed key to success could be useful for the for-profit sector because not only profit can be the impelling in the professional life of a corporation. The human value added is one of the most important keystones of thrift. The aim to establish a balance between economic and ethical behaviour of corporations has been enounced serving the interest of all participants, consumers, corporations and society. The before natural thought values seem nowadays to turn into something different or to be neglected. As a consequence the question has been raised, if society has the force to establish and improve Ethics, will it be able to destroy it as well?! The main focus of the research is therefore the mapping of criteria and marks which belong to on the competitive market successful enterprises whose procurement decisions are ethical as well. These marks can be formal or informal. The results of the research show well that there are parameters of a company, for example, a code of conduct within guidelines concerning the procurement or procedure manuals in which also ethical issues appear in a formal way. From another point of view there are informal signs like customs arising from the corporate culture, daily routine or just human behaviour and convincement of the management and procurement employees that also support the ethical performance of the company. The results of the research can serve as best practice for the other enterprises too in their daily appearance on the market. Particularly in that area the company’s most important

  5. The New EU Public Procurement Directives

    DEFF Research Database (Denmark)

    31 March 2004 the EU adopted two new public procurement directives: one for the public sector (2004/18/EC) and one for utilities (2004/17/EC). The new directives aim at simplification and modernisation of the previously existing directives including adaptation to electronic purchasing techniques......, transparency requirements, competitive dialogue, framework agreements, use of social and environmental criteria, Partnering and Public Private Partnerships and concessions. This book contains contributions based on presentations given by a number of the international and Danish speakers at the conference....

  6. The New EU Public Procurement Directives

    DEFF Research Database (Denmark)

    . On 4-5 November 2004 the Copenhagen Business School organised a European research conference on the new directives. The conference focused on a number of topics which are of particular interest within the field of procurement law in EU these years, including ECJ case law, utilities, electronic auctions......, transparency requirements, competitive dialogue, framework agreements, use of social and environmental criteria, Partnering and Public Private Partnerships and concessions. This book contains contributions based on presentations given by a number of the international and Danish speakers at the conference....

  7. Stopping Illicit Procurement: Lessons from Global Finance

    Energy Technology Data Exchange (ETDEWEB)

    Hund, Gretchen; Kurzrok, Andrew J.

    2014-06-19

    Government regulators and the financial sector cooperate to combat money laundering and terrorist financing. This information-sharing relationship is built upon a strong legislative foundation and effective operational procedures. As with money-laundering and terrorist financing, halting the illicit procurement of dual-use commodities requires close coordination between government and industry. However, many of the legal and operational features present in financial threat cooperation do not exist in the export control realm. This article analyzes the applicability of financial industry cooperative measures to nonproliferation.

  8. THE INCREASE OF COMPETITION IN RUSSIAN PUBLIC PROCUREMENT: THE SEARCH FOR SOLUTIONS IN THE RULES OF PROCEDURES

    Directory of Open Access Journals (Sweden)

    Dmitry Sergeevich Khvalynsky

    2015-09-01

    Full Text Available The procurement activities of Russian government and municipal customers often arises the problem of choosing between splitting contracts in order to increase competition or attraction of large suppliers, known for the quality performance of its obligations, but not involved in petty trading. In order to solve the above problems the paper gives analysis of the effectiveness of the English auction used in Russian public procurement. One of the problems of the model is marked inability to complete the account the capacity of participants. In particular, participants are bidding solely on pre-formed combinations of goods, works and services under the contract. However, often there are situations when the price of goods, works and services depends on its number and combinations. Considering the above, the author offers a rebidding per unit stage or the transition to the use of auctions multiobject auctions recently developed by foreign researchers.

  9. Stochastic energy procurement of large electricity consumer considering photovoltaic, wind-turbine, micro-turbines, energy storage system in the presence of demand response program

    International Nuclear Information System (INIS)

    Nojavan, Sayyad; Aalami, Habib allah

    2015-01-01

    Highlights: • A stochastic energy procurement cost function in presence of DRP is proposed. • The load, price and output power of PV and wind uncertainties are modeled. • Four case studies are used to assess the effects of ESS and DRP on SEPP. • Case 4 is considered the effects of ESS and DRP simultaneously. • The expected energy procurement cost of case 4 is lower than cases 1, 2 and 3. - Abstract: This paper proposes a stochastic energy procurement problem (SEPP) for large electricity consumer (LEC) with multiple energy procurement sources (EPSs) considering the effects of demand response program (DRP) and energy storage system (ESS). The EPSs contain power market (PM), bilateral contracts (BCs), micro-turbines (MTs), and renewable energy sources (RESs). Moreover, the RESs include photovoltaic (PV) systems and wind-turbines (WT). The ESS and DRP are incorporated in the SEPP by the LEC’s decision-maker to reduce the expected energy procurement cost (EEPC). Meanwhile, the uncertainty models of market price, load and RES output power are considered in the SEPP formulation. The error of forecasting of market price, load, temperature and radiation of PV systems are modeled using the normal distribution for generating the related scenarios. Also, the weibull distribution is used to generate variable wind speed scenarios for WT output power uncertainty modeling. Furthermore, the fast forward selection based on Kantorovich distance approach is used for the scenarios reduction. Finally, the influences of ESS and DRP on EEPC are investigated, and four case studies are used to illustrate the capability of the proposed SEPP. The obtained results demonstrate the efficiency of the proposed stochastic program

  10. Where are we now: assessing the price, availability and affordability of essential medicines in Delhi as India plans free medicine for all.

    Science.gov (United States)

    Kotwani, Anita

    2013-07-25

    Inequitable access to medicines is a major weakness in the Indian health care system. Baseline data needed to develop effective public health policy and provide equitable access to essential medicines. The present survey was conducted to investigate the price, availability, and affordability of fifty essential medicines in the public and private sector in Delhi, India using standardized WHO/HAI methodology. Data on procurement price and availability was collected (July-October 2011) from three public healthcare providers: the federal (central) government, state government and Municipal Corporation of Delhi (MCD). Data on price and availability of medicines was collected from private retail and chain pharmacies of a leading corporate house. Prices were compared to an international reference price (expressed as median price ratio-MPR). The procurement price of surveyed medicines was 0.53-0.82 times the international reference price-IRP. However, the overall mean availability of surveyed medicines in facilities under state government and MCD was 41.3% and 23.2%, respectively. The overall mean availability of medicines in three tertiary care facilities operated by the federal government was 49.3%. Availability of generic medicines was much higher in the private sector. Off-patented medicines, like diazepam, diclofenac, and doxycycline had the highest MPRs. The price ratio between procurement and retail was as high as 28 (range 11-28) for certain medicines. Seven-day treatment with a popular brand of amoxicillin+clavulanic acid or one inhaler each of budesonide and salbutamol cost 2.3 and 1.4 days' wages for the lowest paid government worker. A majority of India's population cannot afford these prices. This study revealed that procurement prices of surveyed medicines were reasonable in comparison to IRP. However, variation in procurement prices of certain medicines by different public procurement agencies was noted. Availability of medicines was very poor in public

  11. Prospects for oil prices

    International Nuclear Information System (INIS)

    Stevens, P.

    1992-01-01

    The basic argument presented is that the oil price is set in an administrated market. The administration is undertaken by the controllers of excess capacity to produce crude oil. The extent to which the administrated price matches the market price is a function, first, of the strength and effectiveness of the market controller and, secondly, of the state of supply and demand and expectations in the market. Currently, the market is operating close to capacity, what limited excess capacity exists is located mainly in Saudi Arabia and the Saudi Arabians appear to be following a low price objective. While the Saudi Arabians pursue volume, the short term project, in the balance of a political upheaval, is that oil prices will remain below the $21 per barrel agreed in July 1990. There is a view that Saudi Arabia would take quick action to reverse a price collapse, but attention is drawn to previous miscalculations with respect to price collapse. Should political circumstances allow the return of Iraq to the oil market, then excess capacity within the Gulf members of OPEC will return and control will be much more difficult. (UK)

  12. Prospects for oil prices

    International Nuclear Information System (INIS)

    Caddy, P.

    1992-01-01

    It is argued that the wave in oil prices which occurred in 1991, although appearing to suggest price instability, in fact shows the opposite. Steady oscillation between a low price level that leads to new customers and a high price that encourages customers to switch to alternatives is a sign of a stable market. This relative stability was achieved against the background of the political upheaval in the USSR and Eastern Europe and its unpredictable consequences. Such political uncertainties to one side, the difficulties of assessing demand trends in the light of the imponderables of the state of the world economy and the weather are stressed. Despite these problems, the view is expressed that correct reading of signals up the supply chain by producers should ensure continued relative price stability. This is not to say that prices will stay exactly the same, just that they will be bound within a trading range set by anticipated consumer and producer responses to the fluctuating prices. (UK)

  13. Pricing of new vaccines.

    Science.gov (United States)

    Lee, Bruce Y; McGlone, Sarah M

    2010-08-01

    New vaccine pricing is a complicated process that could have substantial long-standing scientific, medical, and public health ramifications. Pricing can have a considerable impact on new vaccine adoption and, thereby, either culminate or thwart years of research and development and public health efforts. Typically, pricing strategy consists of the following ten components: 1. Conduct a target population analysis; 2. Map potential competitors and alternatives; 3. Construct a vaccine target product profile (TPP) and compare it to projected or actual TPPs of competing vaccines; 4. Quantify the incremental value of the new vaccine's characteristics; 5. Determine vaccine positioning in the marketplace; 6. Estimate the vaccine price-demand curve; 7. Calculate vaccine costs (including those of manufacturing, distribution, and research and development); 8. Account for various legal, regulatory, third party payer, and competitor factors; 9. Consider the overall product portfolio; 10. Set pricing objectives; 11. Select pricing and pricing structure. While the biomedical literature contains some studies that have addressed these components, there is still considerable room for more extensive evaluation of this important area.

  14. Estimating railway infrastructure project cost from transferring nominal price to real price by considering the working time possessions

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Salling, Kim Bang

    construction project, the new line to the fixed link across Fehmarn Belt, is introduced where it is shown that the non-material cost is about 19% of the total expenditure. By assuming three sets of track blocking scenarios with the same amount of construction works it is proven that given an optimal track......The purpose of the paper is to estimate railway project construction cost based on the nominal market price. Currently, estimation of project costs within railway infrastructure procurement is particularly challenging due to; 1) construction costs highly depend on possession timeframes and duration...

  15. Price Discrimination and Market Power

    OpenAIRE

    Shane Carbonneau; Preston McAfee; Hugo Mialon; Sue Mialon

    2004-01-01

    If there is price discrimination, at least one of the prices is not equal to marginal cost. Therefore, if there is price discrimination, there must be market power. While this logic is sound, it has led many policymakers to believe that price discrimination and market power are positively correlated. We present a model where measured price discrimination can be low while market power is high, and price discrimination can be high while market power is low, thus demonstrating that there is no t...

  16. Rationing-Based Price Discrimination

    OpenAIRE

    Ruhai Wu; Xianjun Geng; Andrew B. Whinston

    2006-01-01

    This paper provides a theory of rationing where rationing functions as an effective mechanism for second degree price discrimination by a monopoly seller. When a seller charges multiple prices on homogenous products to all consumers, supply at the lowest price is limited and rationed among consumers. The supply shortage differentiates products sold at the lowest price and those sold at a higher price. When high-valuation consumers identify themselves at the higher price, the seller may extrac...

  17. Risk Pricing in Construction Tenders - How, Who, What

    Directory of Open Access Journals (Sweden)

    Marcus Tower

    2012-11-01

    Full Text Available Construction projects are most commonlyprocured in Australia by means of a traditionaldesign–tender–build model, whereby design islargely completed then contractors submittenders in a competitive environment.Construction contractors must consider riskswithin their tenders. This paper reports theresearch findings into pricing for risk incompetitive tenders by constructioncontractors. The research is based onstructured interviews with 10 contractingpersonnel; supplemented by 23 responses ofconstruction personnel from an online survey.Two common methods to price for risk are atrade-by-trade basis or an overall percentageor lump sum addition to the base estimate.Experience and intuition plays a significant rolein pricing for risk in tenders and the numberand type of people involved varies with projectsize, with greater involvement as project sizeincreases. The most significant risks priced intenders were: availability of resources; designor documentation errors; incomplete design;buildability issues; and inclement weather. Themost significant project factors considered bycontractors when pricing for risk in tenders are:value of liquidated damages; type ofcontract/procurement; completeness ofdocumentation; project complexity; and currentworkload. These risks and project factors areprimarily those over which the contractor haslimited or no control.

  18. US utility uranium procurement: goals and tactics

    International Nuclear Information System (INIS)

    Warner, Jim

    1991-01-01

    This paper summarizes and attempts to explain the results of a survey sent to 37 US utilities asking them two questions: What are the goals of your uranium procurement strategy? and what are the tactics you use in achieving those goals? The results are presented in a summary fashion to protect individual company proprietary information. This paper is directed particularly to non-US uranium market participants as an aid to gain further insight into ''the US market'' and to understand how the potential cumulative market responses of US utilities may influence their procurement plans. Out of 37 utilities surveyed, 25 responded. Some utilities were interviewed over the telephone. Some responses were as short as one paragraph, while others were 1 to 5 pages in length. The format was chosen to encourage original responses. The range of responses could be used in the future as a basis for a multiple-choice type survey to form a more statistically representative sample. The responses are summarized for each of the two questions. (author)

  19. The role of procurement in liabilities management

    International Nuclear Information System (INIS)

    Nicol, R.D.

    1998-01-01

    The new United Kingdom Atomic Energy Authority (UKAEA) has as its primary purpose the management of the liabilities left from the nuclear R and D programme. When it was set up in its present form in 1994 (as UKAEA Government Division) it had as its core functions programme management and procurement. It aimed to be involved in project implementation and operations only in so far as it needed to be for purposes of control as nuclear site licensee, or where otherwise this represented best value for money for the taxpayer. This paper describes how the clear definition and split of client and contractor roles has enabled UKAEA to promote the development of a competitive market in decommissioning, to the benefit of the taxpayer and industry. The importance of procurement at the various stages of planning and implementation are explained, along with some of the initiatives UKAEA has taken to improve client-contractor relationships. It is argued that UKAEA's approach has helped to define the boundaries of what is permissible in contractorization within the terms of a nuclear site licence. (author)

  20. Valuation Struggles over Pricing

    DEFF Research Database (Denmark)

    Pallesen, Trine

    2016-01-01

    Public policies such as feed-in tariffs have been widely introduced to stimulate the development of renewable energies, and sustain a decarbonisation of the electricity sector. Proponents argue that these governance instruments safeguard public goods such as the climate – yet they are accused...... of creating political markets, and political prices, here understood as market distortion. This paper studies the ‘politics’ of pricing by following the adoption of the first feed-in tariff in France. Pricing as a way of achieving non-economic ends, such as climate mitigation, brings the values of several...

  1. Inflated medicine prices in Vietnam: a qualitative study.

    Science.gov (United States)

    Nguyen, Tuan Anh; Knight, Rosemary; Mant, Andrea; Razee, Husna; Brooks, Geoffrey; Dang, Thu Ha; Roughead, Elizabeth Ellen

    2017-06-01

    One third of the world's population lacks regular access to essential medicines partly because of the high cost of medicines. In Vietnam, the cost to patients of medicines was 47 times the international reference price for originator brands and 11 times the price for generic equivalents in the public sector. In this article, we report the results of a qualitative study conducted to identify the principal reasons for inflated medicine prices in Vietnam.Between April 2008 and December 2009, 29 semi-structured interviews were conducted with staff from pharmaceutical companies, private pharmacies, the Ministry of Health, and the Ministry of Finance of Vietnam. Study participants were recruited using a combination of purposive and snowball sampling techniques. Interviews were recorded, transcribed and coded using NVivo8® software and analyzed using a framework of structure-conduct-performance (SCP).Participants attributed high prices of originator medicines to a monopoly of supply. The prices of generic medicines were also considered to be excessive, reportedly due to the need to recoup the cost of financial inducements paid to prescribers and procurement officers. These inducements constituted a dominant cost component of the end price of generic medicines. Poor market intelligence about current world prices, as well as failure to achieve economies of scale because of unwarranted duplication in pharmaceutical production and distribution system were also factors contributing to high prices. This was reported to be further compounded by multiple layers in the supply chain and unregulated retail mark-ups.To address these problems a multifaceted approach is needed encompassing policy and legislative responses. Policy options include establishing effective monitoring of medicine quality assurance, procurement, distribution and use. Rationalization of the domestic pharmaceutical production and distribution system to achieve economies of scale is also required. Appropriate

  2. Assistive technology pricing in Australia: is it efficient and equitable?

    Science.gov (United States)

    Summers, Michael P; Verikios, George

    2018-02-01

    Objective To examine available systematically collected evidence regarding prices for assistive technology (AT; e.g. disability aids and equipment) in Australia with other comparable countries. Issues of appropriate AT pricing are coming to the fore as a consequence of efforts to move to consumer-centric purchasing decisions with the National Disability Insurance Scheme (NDIS) and also in the recent aged care reforms. Methods We identified and present three sets of AT price comparisons. Two comparisons were based solely on the lowest prices advertised on the internet, and one comparison examined recommended retail prices. Variables essential to ensuring accurate comparisons, as well as significant supply-chain issues were also examined and considered in the analyses. Results The first internet-only price comparison found that overall AT prices were 38% higher in Australia compared to other countries, but did not factor in shipping and other related costs that are essential to include given that most AT is imported. The second internet-only price comparison found that overall Australian prices were 24% lower when shipping and related costs were included. The recommended retail price comparisons found that Australian prices were between 14% and 27% lower. Prices for internet-only retailers (those with no bricks-and-mortar presence) are consistently lower for all products than those sold by retailers with actual shop-fronts. Further, there is no evidence of suppliers earning supranormal profits in Australia. Conclusions The results indicate that AT prices in Australia are efficient and equitable, with no significant indicators of market failure which would require government intervention. Efforts to reduce prices through the excessive use of large-scale government procurement programs are likely to reduce diversity and innovation in AT and raise AT prices over time. Open markets and competition with centralised tracking of purchases and providers to minimise possible

  3. Procurement process in a manufacturing company in international environment

    OpenAIRE

    Skála, Ondřej

    2008-01-01

    The diploma thesis deals with procurement process and ensuring of sources in a manufacturing company. The thesis is split into two parts. The first theoretical one deals with importance of procurement in creating economic value in a company, defines procurement, its goals and factors influencing it, describes procurement process, i.e. strategic sourcing, operational purchasing, procurement controlling, supplier relationship management, and procurement process support by IS/ICT. The second pra...

  4. Optimised Selection and use of Project Procurement Strategy in ...

    African Journals Online (AJOL)

    Like every other procurement selection exercise, the process adopt in-depth construction industry tested parameters for appraising and advising on the most suitable procurement strategy based on eight project success criteria. The project organisation accepted both the innovation to adopt the process for change and the ...

  5. 48 CFR 2901.603-72 - Administrative procurement management reviews.

    Science.gov (United States)

    2010-10-01

    ... Authority, and Responsibilities 2901.603-72 Administrative procurement management reviews. (a) The Senior... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Administrative procurement management reviews. 2901.603-72 Section 2901.603-72 Federal Acquisition Regulations System DEPARTMENT OF...

  6. U.S. Hardwood sawmill log procurement practices

    Science.gov (United States)

    Adrienn Andersch; Iris Montague; Urs Buehlmann; Janice K. Wiedenbeck

    2015-01-01

    U.S. hardwood sawmill log procurement practices are evolving because of the recent economic recession, market and supply chain shifts, and changing landowner objectives, among other factors. The objective of this study was to characterize the log procurement practices of hardwood sawmills and to characterize the role that log brokers play in supplying the sawmill...

  7. Public procurement process: global practices and the Nigerian ...

    African Journals Online (AJOL)

    Public procurement has evolved as a powerful tool to deliver public goods and facilitate economic development. Sustained interest in public procurement gained momentum in the 1990s as governments at all levels came under increasing pressures to provide more public goods with less resources. Indeed, all ...

  8. Surgical resident perspective on deceased donor organ procurement.

    Science.gov (United States)

    Osband, Adena J; Laskow, David A

    2015-06-01

    Deceased donor organ procurement provides unparalleled opportunity for surgical residents with extensive surgical exposure. We hypothesize that surgical residents regard organ donation positively and organ procurement enhances their education. We conducted an institutional review board approved anonymous national survey to evaluate organ procurement experiences and attitudes of general surgical residents. Three hundred ninety-seven residents representing all postgraduate years responded, with 97% completion rate. Organ procurement increased with training level (92% seniors vs. 53% interns). Over 85% agree organ procurement is a good educational and operative experience, and 73% believe that it will benefit their future surgical career. About 68% agree that organ procurement provided knowledge of anatomy and exposures; under 10% felt organ procurement could be duplicated with simulation. Presence of transplant program did not affect attitudes or experience. Eighty-eight percent women versus77% men plan to donate their own organs. Results indicate that surgical residents value organ procurement, and it remains an essential encounter that applies to general surgery. Copyright © 2015 Elsevier Inc. All rights reserved.

  9. Effect of Ethics and Integrity on Good Public Procurement System ...

    African Journals Online (AJOL)

    This study aimed at exposing the effect of ethics and integrity on good public procurement system in Nigeria. Data for the study were collected through a structured questionnaire administered on eighty-two (82) officers of the Bureau for Public Procurement in Abuja, Nigeria. The data generated were analysed with the ...

  10. Good Governance in Public Procurement: A South African Case Study

    African Journals Online (AJOL)

    In this article good governance in public procurement, with particular reference to accountability is discussed. The principle of providing adequate remedies in public procurement is put under the spotlight. This is done with reference to the decision in Steenkamp NO v Provincial Tender Board, Eastern Cape. In this case the ...

  11. Procurement of intermediary services: Interpreters in the Netherlands

    NARCIS (Netherlands)

    Felsö, F.

    2008-01-01

    This paper reports on the procurement of intermediary services in interpreters to approximately one third of all public clients in The Netherlands. The procurement has lead to a smooth transition from public to a private organization and the new intermediary performs to the satisfaction of its

  12. Public sector procurement and black economic empowerment in ...

    African Journals Online (AJOL)

    South Africa's public sector procurement facility is envisaged as one of the key tools to remedy past injustices in that country in which blacks were disadvantaged. Section 217 of the country's Constitution makes express provision for a procurement policy providing for the preferential allocation of contracts and the ...

  13. Procurement under the Uncitral model law: a southern Africa ...

    African Journals Online (AJOL)

    The stages for opening up procurement markets, referred to by Yukins and Schooner, is discussed and it is concluded that the states in SADC is still in the initial stages of opening its public procurement markets for regional competition. Although COMESA is not yet in full compliance with all four the stages great strides have ...

  14. The Dutch system of legal protection in public procurement procedures

    NARCIS (Netherlands)

    van Heeswijck, Arthur

    2015-01-01

    The legal protection of entrepreneurs in public procurement procedures has been a point of concern to the European Union legislator, leading to the adoption of well-known the Remedies Directives. This article examines the conformity of the Dutch system of judicial protection in the procurement field

  15. Correlates of Procurement Performance of Traditional and Labour ...

    African Journals Online (AJOL)

    Correlates of procurement performance of Traditional and Labour- only methods are investigated. Purpose of this study is to investigate if procurement challenges, contractual procedures, designer's experience, building type and final contract sum have influences on the performance of both methods. 120 questionnaires ...

  16. The impact of preferential procurement in South African construction ...

    African Journals Online (AJOL)

    The impact of preferential procurement in South African construction industry. ... The outcome of this study shows that there are problems in the implementation of PPPFA during tendering and procurement processes and procedures for achieving success in government projects. Key words: HDIs, PPPFA, Policies, ...

  17. The EU Public Procurement regime - Does It Work?

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Ulff-Møller; Hansen, Lars Gottlieb

    2001-01-01

    Has the Single Market for public procurement had the expected effects after six years in progress? The following article attempts to answer this question by first presenting alternative theoretical approaches to analysing the EU liberalisation of the public procurement market and then confronting...

  18. 48 CFR 1323.404-70 - DOC affirmative procurement program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOC affirmative procurement program. 1323.404-70 Section 1323.404-70 Federal Acquisition Regulations System DEPARTMENT OF..., OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials 1323.404-70 DOC affirmative procurement...

  19. Public procurement, governance and economic growth: some policy ...

    African Journals Online (AJOL)

    Public procurement, governance and economic growth: some policy recommendations for Africa's growth and development. ... International Journal of Development and Management Review ... The paper presents an analytical insight into the link between public procurement, governance and economic growth. It shows that ...

  20. 22 CFR 201.22 - Procurement under public sector procedures.

    Science.gov (United States)

    2010-04-01

    ... bids. The invitation for bids and every attachment and amendment thereto shall be in the English... procurement. Purchasing by brand or trade name or by a restrictive specification (proprietary procurement) may... by operating personnel, can be achieved through standardizing on a particular brand; (2...

  1. Public procurement of innovation in construction : A design science approach

    NARCIS (Netherlands)

    Lenderink, B.; Halman, J. I.M.; Voordijk, J. T.

    2016-01-01

    The inclusion of innovation as a policy objective in public procurement has increased significantly at public organizations over the last years. However, public organizations often struggle with how they should stimulate innovation through public procurement as there are many different ways possible

  2. Procurement strategy formation : (re-)designing rail infrastructure project alliances

    NARCIS (Netherlands)

    Plantinga, Henrico; Dorée, André

    2016-01-01

    Purpose – The purpose of this paper is to provide insights into the reasoning behind the development of new procurement approaches by public sector clients. Design/methodology/approach – A case study approach focuses on a procurement development process by a public sector client. It investigates the

  3. 78 FR 75912 - Procurement List; Addition and Deletion

    Science.gov (United States)

    2013-12-13

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Addition to and deletion from the Procurement List. SUMMARY: This action adds a service to the Procurement...: General Services Administration, Fort Worth, TX Deletion On 11/1/2013 (78 FR 65618), the Committee for...

  4. 78 FR 17641 - Procurement List; Proposed Addition and Deletion

    Science.gov (United States)

    2013-03-22

    ... Addition and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed Addition to and Deletion from the Procurement List. SUMMARY: The Committee is proposing to add a..., Washington, DC Deletion The following product is proposed for deletion from the Procurement List: Product...

  5. 78 FR 27369 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2013-05-10

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and Deletion from the Procurement List. SUMMARY: This action adds products to the Procurement..., Philadelphia, PA. Deletion On 4/5/2013 (78 FR 20622-20623), the Committee for Purchase From People Who Are...

  6. 76 FR 27999 - Procurement List; Addition and Deletion

    Science.gov (United States)

    2011-05-13

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Addition to and Deletion from the Procurement List. SUMMARY: This action adds a service to the Procurement... USA ROCK ISL Arsenal, Rock Island, IL. [[Page 28000

  7. 76 FR 5142 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2011-01-28

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement.... Contracting Activity: Department of Transportation, Federal Aviation Administration, Jamaica, NY. Deletion On...

  8. Corruption in Public Procurement: Finding the Right Indicators

    NARCIS (Netherlands)

    Ferwerda, J.; Deleanu, I.S.; Unger, B.

    2017-01-01

    Red flags are widely used to minimize the risk of various forms of economic misconduct, among which corruption in public procurement. Drawing on criminal investigations, the literature has developed several indicators of corruption in public procurements and has put them forward as viable risk

  9. Corruption in Public Procurement : Finding the Right Indicators

    NARCIS (Netherlands)

    Ferwerda, Joras; Deleanu, Ioana; Unger, Brigitte

    2017-01-01

    Red flags are widely used to minimize the risk of various forms of economic misconduct, among which corruption in public procurement. Drawing on criminal investigations, the literature has developed several indicators of corruption in public procurements and has put them forward as viable risk

  10. 19 CFR 162.11 - Authority to procure warrants.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false Authority to procure warrants. 162.11 Section 162.11 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) INSPECTION, SEARCH, AND SEIZURE Search Warrants § 162.11 Authority to procure...

  11. 77 FR 38775 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2012-06-29

    ... each meal service, providing cashier services; cleaning and sanitizing food service equipment and... proposing to add products and services to the Procurement List that will be furnished by nonprofit agencies... Government identified in this notice will be required to procure the products and services listed below from...

  12. Implementing Sustainable Public Procurement : an organisational change perspective

    NARCIS (Netherlands)

    J. Grandia (Jolien)

    2015-01-01

    markdownabstractFor the execution of policies, as well as for its own operations, governments procure goods and services, ranging from paper and pencils to fighter planes, cleaning services and public road works. In the European Union public procurement represents 16% of the gross domestic product.

  13. The procurement of NHS dental services--a guide.

    Science.gov (United States)

    Jones, C L; Rooney, E

    2009-05-23

    This paper gives an overview of the strategic background for procurement of NHS primary care dental services and an outline of the processes involved in procurement. The main aim is to bring procurement to the attention of a wider audience of dental practitioners and provide advice for potential primary care dental service providers. The move towards local procurement of healthcare services, including primary care dental services, has been shaped by a number of strategic Government publications and is supported by law. In line with other public bodies, the NHS is subject to the European Union and international rules regarding procurement and awarding contracts. Primary Care Trust (PCT) Dental Service Commissioners have to ensure that their procurement strategy is transparent and non-discriminatory so that all providers have an equal opportunity to compete for contracts. In order to successfully tender for future service provision contracts, dental practitioners not only need to be aware of the process of procurement and its associated legal requirements. It is also important that they have a grasp of the expectations of PCTs. Commissioning services via procurement is set to become more commonplace and it is likely, in time, that competition for some contracts will increase in intensity. The importance of researching proposals thoroughly and adopting a professional, businesslike approach to tendering cannot be understated as this maximises chance of success in the new commissioning environment.

  14. The availability, pricing and affordability of three essential asthma medicines in 52 low- and middle-income countries.

    Science.gov (United States)

    Babar, Zaheer-Ud-Din; Lessing, Charon; Mace, Cécile; Bissell, Karen

    2013-11-01

    Almost 300 million people suffer from asthma, yet many in low- and middle-income countries have difficulty accessing essential asthma medicines. Availability, price and affordability of medicines are likely to affect access. Very few studies have included asthma medicines, particularly inhaled corticosteroids, in these countries. Reflections about international reference prices (IRPs) are generally absent from pricing studies, yet some IRPs may be masking the extent of access problems. Our objective was to determine the availability, pricing and affordability of beclometasone, budesonide and salbutamol, the three asthma medicines on the World Health Organization's Model List of Essential Medicines (EML) in selected low- and middle-income countries and to reflect on the appropriateness of using IRPs. A cross-sectional pricing survey was conducted in 52 countries. Data were collected on country demographics including national currency, $US exchange rate and daily wage of the lowest-paid unskilled government worker. Pricing and availability data were collected for salbutamol, beclometasone and budesonide in two private retail pharmacies, the national procurement centre and a main public hospital. Availability was particularly poor for corticosteroids, and worse in national procurement centres and main hospitals. The surveyed strength of beclometasone was only on the EML of ten countries. Considerable variability was found in pricing and affordability across countries. Procurement systems appeared largely inefficient when Asthma Drug Facility prices were applied as references. Some countries appear to be subsidising asthma medicines, making them free or less expensive for patients, while other countries are applying very high margins, which can significantly increase the price for patients unless a reimbursement system exists. Findings raise important policy concerns. Availability of inhaled corticosteroids is poor; many EMLs are not updated; IRPs can be misleading

  15. Price of military uranium

    International Nuclear Information System (INIS)

    Klimenko, A.V.

    1998-01-01

    The theoretical results about optimum strategy of use of military uranium confirmed by systems approach accounts are received. The numerical value of the system approach price of the highly enriched military uranium also is given

  16. The price of pollution

    International Nuclear Information System (INIS)

    Bleijenberg, A.N.; Davidson, M.D.; Wit, R.

    1998-06-01

    The market does not create a price for environmental pollution for the simple reason that there is no market for the environment. What can be done is to calculate shadow prices for environmental pollution, which is achieved by calculating the price that would arise if there would be a market for the environment. In applying this method, it generally proves to be necessary to base calculations on government environmental targets. Using available research data, the method is used to calculate shadow prices for a number of key pollutants. The present report is based on the CE studies 'Schaduwprijzen Prioriterings Methodiek (SPM)' (1997), commissioned by ICI Holland BV, and 'De prijs van Milieuvervuiling' (1997), commissioned by KNP BT Packaging

  17. Market News Price Dataset

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Real-time price data collected by the Boston Market News Reporter. The NOAA Fisheries' "Fishery Market News" began operations in New York City on February 14, 1938....

  18. AKRO: Standard Prices

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Standard prices are generated for cost recovery programs in the Individual Fishing Quota (IFQ) halibut and sablefish, BSAI Rationalized crab, and Central Gulf of...

  19. Essays on Derivatives Pricing

    DEFF Research Database (Denmark)

    Kokholm, Thomas

    . With the existence of a liquid market for derivatives with variance as underlying, such as VIX options, VIX futures and a well-developed over-the-counter market for options on variance swaps, it is important to consider models that are able to fit these markets while consistently pricing vanilla options...... financial models, and most importantly, to be aware of their limitations. Following that belief, this thesis consists of three independent and self-contained papers, all dealing with topics in derivatives pricing. The first paper considers the pricing of traffic light options, which are appropriate...... the market for multivariate credit instruments, we take a step back and focus on single-name default modeling and introduce two new model classes for modeling of the default time of a company. Finally, in the third paper we propose a consistent pricing model for index and volatility derivatives...

  20. The role and duties of client in public procurement management

    Directory of Open Access Journals (Sweden)

    Joković Radomir V.

    2015-01-01

    Full Text Available Public procurement is given great importance in all developed countries. The subject of this paper is to present the application of basic concepts of project management from the standpoint of public procurement in the higher education institution. Previous research, by examining the literature of domestic and foreign authors, and analysis of project performance management model is defined by the public procurement in the higher education institution whose application can improve overall process performance lrojekta and contribute to economic and efficient implementation of planned activities and time for reaching the goals. One of the objectives of model application of project management procurement at a higher education institution is to identify and determine the type and quantity of goods, uspuga, works, studies of conditions that influence their purchase, as well as finding ways of ensuring that goods, services, papers are available on the project in due time. This paper presents a model of project management public procurement in the higher education institution.

  1. Innovation and Public Procurement: Terminology, Concepts, and Applications

    DEFF Research Database (Denmark)

    Obwegeser, Nikolaus; Müller, Sune Dueholm

    2018-01-01

    differentiates between literature streams on (1) innovations in the public procurement process, (2) innovation of public services by means of procurement, and (3) the use of public procurement as a tool for demand-side innovation policy-making. For each of these streams of literature, different focus areas...... are often using ambiguous wording and have not yet reached consensus on the terminology and concepts involved. This state of affairs leads to research fragmentation and lack of knowledge convergence. For the purpose of contributing to knowledge synthesis and consolidation, this article provides a structured...... review of the literature on innovation in public procurement. From categorizing publications based on innovation drivers, concepts, and research approaches, the emerging structure of the field is described and synthesized into a framework of innovation in public procurement. The proposed framework...

  2. Access to paediatric essential medicines: a survey of prices, availability, affordability and price components in Shaanxi Province, China.

    Directory of Open Access Journals (Sweden)

    Xiao Wang

    Full Text Available OBJECTIVE: To evaluate the prices and availability of paediatric essential medicines in Shaanxi Province, China. METHODS: Price and availability data for 28 paediatric essential medicines were collected from 60 public hospitals and 60 retail pharmacies in six areas of Shaanxi Province using a standardised methodology developed by the World Health Organization and Health Action International, during November to December 2012. Affordability was measured as the number of days' wages required for the lowest-paid unskilled government worker to purchase standard treatments for common conditions. Data on medicine price components were collected from hospitals, wholesalers and distributors to obtain price mark-ups. FINDINGS: The mean availabilities of originator brands (OBs and lowest-priced generics (LPGs were 10.8% and 27.3% in the public hospitals and 11.9% and 20.6% in the private pharmacies. The public procurement and retail prices were 2.25 and 2.59 times the international reference prices (IRPs for three OBs, and 0.52 and 0.93 times for 20 LPGs. In the private sector, the final prices for OBs and LPGs were 3.89 and 1.25 times their IRPs. The final price in the private sector was 2.7% lower than in the public sector for OBs, and 14.1% higher for LPGs. Generally, standard treatments cost less than 1 day's wages in both sectors. Distribution mark-ups applied to brand salbutamol in Xi'an was 65.5%, and up to 185.3% for generic. Cumulative mark-ups for LPGs in Ankang were also high, from 33% to 50%. The manufacturer's selling price is the largest contributor to the final price in both areas. CONCLUSIONS: The government should approve a list of national paediatric essential medicines. The availability, price and affordability of these should be improved in both public hospitals and private pharmacies to enable children to obtain effective treatment. Measures should be taken to improve the efficiency of the centralised medicine purchasing system.

  3. New product pricing

    International Nuclear Information System (INIS)

    Wilkinson, V.K.

    1981-01-01

    One of the most uncertain elements in budget planning is estimating production costs of items that have heretofore only been produced in prototype configurations and quantities. This paper examines the design and development of a mathematical model which computes appropriate prices for new and unique products. The resulting model offers a producer a fair return on his investment and the consumer a fair purchase price

  4. Navy Acquisition Executive's Management Oversight and Procurement Authority Category I and II Programs

    National Research Council Canada - National Science Library

    2007-01-01

    .... This report discusses the management oversight and procurement authority within the Navy. Two other reports discussed the management oversight and procurement authority within the Army and Air Force...

  5. Procurement Practices for the Composite Armored Vehicle and Composite Affordability Initiative Programs

    National Research Council Canada - National Science Library

    Granetto, Paul

    1999-01-01

    The audit objective was to determine whether violations of procurement regulations occurred regarding procurement of selected components of the Army Crusader vehicle and the Joint Strike Fighter aircraft...

  6. International Government-Procurement Obligations of the United States: An Overview

    National Research Council Canada - National Science Library

    Tatelman, Todd B

    2005-01-01

    .... The most notable agreements are contained in the World Trade Organization (WTO) Agreement on Government Procurement and the procurement chapter of the North American Free Trade Agreement (NAFTA...

  7. Analyzing the effects of past prices on reference price formation

    NARCIS (Netherlands)

    R.D. van Oest (Rutger); R. Paap (Richard)

    2004-01-01

    textabstractWe propose a new reference price framework for brand choice. In this framework, we employ a Markov-switching process with an absorbing state to model unobserved price recall of households. Reference prices result from the prices households are able to remember. Our model can be used to

  8. Price Recall, Bertrand Paradox and Price Dispersion With Elastic Demand

    NARCIS (Netherlands)

    Carvalho, M.

    2009-01-01

    This paper studies the consequence of an imprecise recall of the price by the consumers in the Bertrand price competition model for a homogeneous good. It is shown that firms can exploit this weakness and charge prices above the competitive price. This markup increases for rougher recall of the

  9. Why do stumpage prices increase more than lumber prices?

    Science.gov (United States)

    William G. Luppold; John E. Baumgras; John E. Baumgras

    1998-01-01

    Every sawmiller who has been in business more than 5 years realizes that hardwood stumpage prices tend to increase faster than lumber prices, decreasing the margin between these two prices. Although increases in stumpage versus lumber prices are readily apparent, the reason for the decrease in the margin is not. Recent research findings indicate that the stumpage/...

  10. Forecasting Day-Ahead Electricity Prices : Utilizing Hourly Prices

    NARCIS (Netherlands)

    E. Raviv (Eran); K.E. Bouwman (Kees); D.J.C. van Dijk (Dick)

    2013-01-01

    textabstractThe daily average price of electricity represents the price of electricity to be delivered over the full next day and serves as a key reference price in the electricity market. It is an aggregate that equals the average of hourly prices for delivery during each of the 24 individual

  11. DEMAND AND PRICES

    Directory of Open Access Journals (Sweden)

    VĂDUVA MARIA

    2014-08-01

    Full Text Available Studying the consumer’s behavior by the ordinal approach of utility with the help of indifference curves allows us to deduce the two “movement laws of demand” in this chapter: the demand for a “normal” good is decreasing function of its price and an increasing function of income. We will use the elasticity concept to measure the intensity of the relation that is established between the demand, on the one hand, and prices or income, on the other hand: elasticity – price, direct and crossed, and elasticity – income. We can classify the goods in many categories, depending on the values that this elasticity takes. The demand elasticity can be determined depending on price and income. It reflects the proportion in which the demand for different products changes with the modification of the consumers’ income, the other factors remaining constant. The elasticity compared to the income is a demonstration of legality from the consumer’s sphere, which determines a certain hierarchy of the needs of each population category in a certain level of income. The movement of prices orients both the options and decisions of producers, namely the most useful productions and the most efficient investments, as well as the consumers’ options and decisions on the most advantageous buying of goods and services that they need. The prices appear as a “signal system” coordinating and making coherence the economic agents’ decisions – producers, consumers and population.

  12. Procurement and production of biofuels - a Finnish example of private entrepreneurship

    International Nuclear Information System (INIS)

    Tuomi, S.

    1997-01-01

    A conference paper. In Finland, heating entrepreneurship, i.e. supplying customers with heat energy from wood raw material, is a new form of rural enterprise. The entrepreneur is mainly responsible for supplying heat energy to municipal real estates in the form of chipped wood. He procures the fuel and supervises the heating plant and is paid on the basis of the amount of heat generated. The price of the supplied heat is usually bound to the price of light fuel oil, but agreements based on the price development of district heat and chips are also used. At the end of 1996 there were 36 examples of heating enterprises in Finland and about 20 new ones are planned to start in 1997. Twenty-nine of the operational targets supplied by heating-energy entrepreneurs were single-building heating plants and seven were district heating plants, all using oil for additional or reserve energy. Heating entrepreneurship provides extra income, especially for farmers, who have otherwise unmarketable potential fuelwood in their wood lot, underutilized timber harvesting equipment, experience of using fuel chips, and lack of supplementary income opportunities. 1 figure, 6 tabs

  13. Estimating the commodity market price of risk for energy prices

    International Nuclear Information System (INIS)

    Kolos, Sergey P.; Ronn, Ehud I.

    2008-01-01

    The purpose of this paper is to estimate the ''market price of risk'' (MPR) for energy commodities, the ratio of expected return to standard deviation. The MPR sign determines whether energy forward prices are upward- or downward-biased predictors of expected spot prices. We estimate MPRs using spot and futures prices, while accounting for the Samuelson effect. We find long-term MPRs generally positive and short-term negative, consistent with positive energy betas and hedging, respectively. In spot electricity markets, MPRs in Day-Ahead Prices agree with short-dated futures. Our results relate risk premia to informed hedging decisions, and futures prices to forecast/expected prices. (author)

  14. Delivered Pricing, FOB Pricing, and Collusion in Spatial Markets

    OpenAIRE

    Maria Paz Espinosa

    1992-01-01

    This article examines price discrimination and collusion in spatial markets. The problem is analyzed in the context of a repeated duopoly game. I conclude that the prevailing pricing systems depend on the structural elements of the market. Delivered pricing systems emerge in equilibrium in highly monopolistic and highly competitive industries, while FOB is used in intermediate market structures. The fact driving this result is that delivered pricing policies allow spatial price discrimination...

  15. Forecasting Day-Ahead Electricity Prices: Utilizing Hourly Prices

    OpenAIRE

    Raviv, Eran; Bouwman, Kees E.; van Dijk, Dick

    2013-01-01

    This discussion paper led to a publication in 'Energy Economics' , 2015, 50, 227-239. The daily average price of electricity represents the price of electricity to be delivered over the full next day and serves as a key reference price in the electricity market. It is an aggregate that equals the average of hourly prices for delivery during each of the 24 individual hours. This paper demonstrates that the disaggregated hourly prices contain useful predictive information for the daily average ...

  16. The influence of public procurement policies on the implementation of procurement best practices in South African universities

    Directory of Open Access Journals (Sweden)

    Winnie Dlamini

    2012-11-01

    Full Text Available The relationship between public procurement policies and procurement best practices (PBPs in higher education institutions is inevitable. Higher education institutions (HEIs in South Africa play a crucial role in contributing to the economic, social and environmental development of the country. Hence the implementation of PBPs has a key role in creating a competitive advantage for higher education. The purpose of this article is to determine the influence of public procurement policies on the implementation of PBPs in the public HEIs in South Africa. The article employs a theoretical review of related literature on public procurement and PBPs. The article articulates that public procurement policies influence the implementation of PBPs in public HEIs in South Africa.

  17. Direct procurement of wound management products.

    Science.gov (United States)

    Jenkins, Trevor

    2014-03-01

    This article describes a collaborative project between Bedfordshire Community Health Services and Primary Care Trusts/Clinical Commissioning Groups to improve provision of dressings to nurses for the patients they treat. Commissioners have facilitated a transformational approach and encouraged development of efficient systems of increased cost-effectiveness rather than a transactional approach based on opportunistic cost improvement plans. Reconfiguration to direct procurement from GP prescribing has reduced wastage, released nurse time from processes to spend on clinical contact time with patients, increased efficiency, and reduced prescription workload for GPs, all without adverse effects on expenditure. Establishing a wound care products formulary placed control under the nurses treating patients and facilitated decision-making based on cost-effectiveness in clinical use. Nurses now manage 60% of expenditure in the local community health economy, and this is increasing. Relationships with the dressings manufacturing industry have also changed in a positive, constructive direction.

  18. Press point on the prices

    International Nuclear Information System (INIS)

    Schilansky, J.L.

    2005-11-01

    To analyze the prices situation of the motor fuels, the authors present the mechanisms of the prices formation (markets, crude oils price and margins) and the market context (distribution, taxes, french energy policy). They discuss then the impacts of the round table of the 16 September 2005 at Bercy, facing the increase of the motor fuels prices. (A.L.B.)

  19. Faculty Awareness of Textbook Prices.

    Science.gov (United States)

    Sommer, Robert; And Others

    1988-01-01

    Reports that variation in textbook prices is not correlated with textbook quality as judged by instructors and that university faculty are less price conscious when selecting textbooks than are community college faculty. States that, if faculty had greater access to price information, textbook prices would decrease. Makes recommendations for…

  20. Prices in the two Germanies

    NARCIS (Netherlands)

    Dietzenbacher, E; Wagener, HJ

    Comparative evaluations across economic systems are often hampered by the typical valuation problem, that is, market prices have a different meaning than planned prices. This paper considers prices in the two Germanies and the widely accepted hypothesis that East German prices did not reflect