Sample records for annual work plan

  1. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  2. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  3. Audubon NWR complex annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  4. Annual Habitat Work Plan Prime Hook National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge will begin developing its Comprehensive Conservation Plan in fiscal year 2005. This Annual Habitat Work Planning report will summarize accomplishments for...

  5. NWRS Region 1 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 1, Inventory and Monitoring Program (I present vision and...

  6. NWRS Region 8 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  7. NWRS Region 3 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 3, Inventory and Monitoring Program (I present vision and...

  8. NWRS Region 4 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 4, Inventory and Monitoring Program (I present vision and...

  9. Upper Souris National Wildlife Refuge annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Upper...

  10. Lostwood National Wildlife Refuge annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  11. Rainwater Basin Wetland Management District annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  12. Waubay National Wildlife Refuge Complex annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  13. Huron Wetland Management District annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Huron...

  14. Des Lacs National Wildlife Refuge annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Des...

  15. Lee Metcalf National Wildlife Refuge 2005 annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Lee...

  16. Bowdoin National Wildlife Refuge Complex 2005 annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  17. Arapaho National Wildlife Refuge 2005 annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  18. Boyer Chute National Wildlife Refuge 2005 annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Boyer...

  19. Kulm Wetland Management District annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Kulm...

  20. Tewaukon National Wildlife Refuge Complex annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  1. Annual Habitat Work Plan, North Mississippi Refuges Complex 2011

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2011 on Dahomey, Tallhatchie, Coldwater River Refuges and the Henson FSA Tract of the North MS Refuge...

  2. Annual Habitat Work Plan, North Mississippi Refuges Complex 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2005 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  3. Annual Habitat Work Plan, North Mississippi Refuges Complex 2008

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2008 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  4. NWRS Region 6 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 6, Inventory and Monitoring Program (I present vision and...

  5. Annual Habitat Work Plan, North Mississippi Refuges Complex 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2012 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  6. Annual Habitat Work Plan, North Mississippi Refuges Complex 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2004 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  7. Office of Inspector General fiscal year 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  8. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  9. System Summary of University Annual Work Plans, 2014-15

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future; (1) The Board of Governors' new Strategic Plan 2012-2025 is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's Annual Accountability Report provides yearly tracking for how the System is…

  10. Flint Hills National Wildlife Refuge : Annual habitat work plan (calendar year 2009)

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat management work plan for the calendar year of 2009 at Flint Hills National Wildlife Refuge. Management plans for each habitat type is included as well...

  11. Annual Habitat Work Plan Prime Hook National Wildlife Refuge 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is a plan that outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience. Wetland objectives...

  12. Combined Annual Habitat Work Plans, 2010-2012 : Fish Springs NWR

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This combined Annual Habitat Work Plan (AHWP) for Fish Springs National Wildlife Refuge provides a report on habitat management activities for years 2010- 2012 and...

  13. Lake Andes National Wildlife Refuge Complex annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Lake...

  14. Sand Lake National Wildlife Refuge/Wetland Management District annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Sand...

  15. Crescent Lake/North Platte National Wildlife Refuge Complex 2005 annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  16. Long Lake National Wildlife Refuge Complex annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Long...

  17. Devils Lake Wetland Management District Complex 2005 annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  18. National Wildlife Refuge System Region 7 Inventory and Monitoring Regional Annual Work Plan Fiscal Year 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 7 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  19. Region 1 National Wildlife Refuge System Inventory and Monitoring Program : Annual Work Plan : Fiscal Year 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 1 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  20. 2005 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Parker River Refuge is currently developing a Habitat Management Plan, and expects a draft HMP by summer of 2006. The Refuge finalized a master plan in 1986;...

  1. Annual Habitat Work Plan Seatuck National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan outlines management activities that include forest protection, grassland management, wetland restoration, wildlife nesting structures, invasive vegetation...

  2. Annual Habitat Work Plan Wertheim National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Management activities outlined in this plan include forest protection, grassland management, and wetland restoration, wildlife nesting structures and restoring...

  3. Annual Habitat Work Plan Conscience Point National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan outlines the goals and objectives for management of the refuge’s grasslands and wetlands that includes the recovery effort for Sandplain Gerardia, the...

  4. Annual Habitat Work Plan Prime Hook National Wildlife Refuge 2014

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — AHWP describes the habitat and wildlife responses to management actions and weather conditions of 2013 and planned habitat management strategies, prescriptions and...

  5. Annual Habitat Work Plan Chincoteague National Wildlife Refuge 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan provides specific goals and objectives for how the refuge will manage its wetlands, beach, uplands, invasive species and artificial nesting.

  6. 2008 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In 2006, Parker River NWR completed a Habitat Management Plan, which will guide the management of the wildlife and habitats on the Refuges for the next 15 years. The...

  7. 2009 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In 2006, Parker River NWR completed a Habitat Management Plan, which will guide the management of the wildlife and habitats on the Refuges for the next 15 years. The...

  8. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmon recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.

  9. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to

  10. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to

  11. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1990-01-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing

  12. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.

  13. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1989.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1988-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501. the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1989. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3 of the Program. The Work Plan includes schedules with key milestones for FY 1989 and beyond, and is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded projects discussed in the FY 1989 Work Plan are listed in Tables 1 and 2 according to their current status. Table 1 (pp. 3-11) lists completed, ongoing, and deferred projects. Table 2 (pp. 12-13) lists all projects which BPA plans to fund as ''new'' projects in FY 1989. ''Ongoing'' status indicates that the project started in FY 1988 or before, and that it was still being implemented by BPA at the end of FY 1988. &apos

  14. Inventory and Monitoring (I&M) Initiative FY 2012 Annual Report and FY 2013 Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual report describes implementation of the National Wildlife Refuge System's Inventory and Monitoring (I results from all eight regions and the I&M...

  15. Pocosin Lakes National Wildlife Refuge : 2006 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2006 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  16. Pocosin Lakes National Wildlife Refuge : 2009 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2009 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  17. Pocosin Lakes National Wildlife Refuge : 2004 Habitat Management Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2004 Annual Habitat Work Plan is an annual work plan that details incremental tasks in support of the Habitat Management Plan goals and objectives. The annual...

  18. 2006-07 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Parker River NWR recently completed a Habitat Management Plan, which will guide the management of the wildlife and habitats on the Refuges for the next 15 years. The...

  19. 2009-2010 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In 2006, Parker River NWR completed a Habitat Management Plan, which will guide the management of the wildlife and habitats on the Refuges for the next 15 years. The...

  20. 1988 Annual water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1987 Annual Water Management Report 1988 Annual Water Management Plan. Includes 1987 weather summary, water availability forecast, summary of 1987...

  1. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1987-1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide Bonneville Power Administration (BPA) in carrying out our responsibility to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gave BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife were affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for Program implementation during Fiscal Year (FY) 1988. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Program's Action Plan: to provide a solid, timely, and focused basis for budgeting and planning. Additionally, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3. It includes schedules with key milestones for FY 1988 through FY 1990. The Work Plan is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program.

  2. 7 CFR 23.6 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Plan of Work. 23.6 Section 23.6 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State Program § 23.6 Plan of Work. (a) A State Annual Plan of Work for carrying out the programs authorized under title V shall...

  3. 45 CFR 1176.5 - Annual plan.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Annual plan. 1176.5 Section 1176.5 Public Welfare... ENDOWMENT FOR THE HUMANITIES PART-TIME CAREER EMPLOYMENT § 1176.5 Annual plan. (a) An agencywide plan for promoting part-time employment opportunities will be developed annually. This plan will establish...

  4. 7 CFR 23.13 - Plan of Work.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Plan of Work. 23.13 Section 23.13 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded...

  5. Planning Annual Shutdown Inspection for BFB Boiler

    OpenAIRE

    Sorsa, Tatu

    2014-01-01

    The goal of this thesis was to create an illustrative guidebook of annual inspection planning for BFB boiler to help power plant operator when planning of annual inspection is topical. This thesis was made for Andritz Oy and it is based on inspection reports and experiences of BFB boiler’s maintenance and inspection staff. In this thesis it is shown how to plan an annual inspection for BFB boiler and thesis gives good tools and hints for operator to manage inspection from the beginning ...

  6. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice. SUMMARY: The Denali Commission....C. 3121). The Denali Commission Act requires that the Commission develop proposed work plans for future spending and that the annual Work Plan be published in the Federal Register, providing...

  7. 77 FR 67635 - Fiscal Year 2013 Draft Work Plan

    Science.gov (United States)

    2012-11-13

    ... Year 2013 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice. SUMMARY: The Denali Commission....C. 3121). The Act requires that the Commission develop proposed work plans for future spending and that the annual Work Plan be published in the Federal Register, providing an opportunity for a...

  8. 1986-87 Annual Trapping Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Trapping Plan for the 1986-87 trapping season at Clarence Cannon NWR outlines rules and regulations for the trapping of beaver, muskrat, raccoon,...

  9. Environmental Planning and Ecology Program Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  10. Work through the valley: plan.

    Science.gov (United States)

    Jones, Loretta; Meade, Barbara; Koegel, Paul; Lucas-Wright, Aziza; Young-Brinn, Angela; Terry, Chrystene; Norris, Keith

    2009-01-01

    This first of three chapters on the Valley stage, or main work of a Community-Partnered Participatory Research (CPPR) initiative, concerns the planning phase of the work cycle. The main goal of this phase is to develop an action plan, which clarifies the goals, methods, responsible individuals, and timeline for doing the work. Further, this chapter reviews approaches, such as creativity and use of humor, that help level the playing field and assure community co-leadership with academic partners in developing effective action plans.

  11. TWRS Systems Engineering Working Plan

    Energy Technology Data Exchange (ETDEWEB)

    Eiholzer, C.R.

    1994-09-16

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations.

  12. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm;

    2012-01-01

    trajectories. METHODS AND THEORY: An in-depth case study of patient trajectories at a Danish hospital and surrounding municipality using individual interviews with patients. Theory about trajectory and work by Strauss was included. RESULTS: Patients continuously took initiatives to organize their treatment...... and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. DISCUSSION: Work done by patients was invisible and not perceived as work....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  13. Radiological Work Planning and Procedures

    CERN Document Server

    Kurtz, J E

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In add...

  14. Polar Research Board annual report, 1987 and future plans

    Energy Technology Data Exchange (ETDEWEB)

    1988-12-31

    This annual report describes the Polar Research Board, its origin and objectives, its work and plans, and its principle activities and accomplishments during calendar year 1987. The Overview presents a concise summary of the various aspects of the Board`s program and of its responsibilities as US National Committee for the Scientific Committee on Antarctic Research (SCAR) of the International Council of Scientific Unins. Arctic and Antarctic activities are described.

  15. Polar Research Board annual report, 1987 and future plans

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    This annual report describes the Polar Research Board, its origin and objectives, its work and plans, and its principle activities and accomplishments during calendar year 1987. The Overview presents a concise summary of the various aspects of the Board's program and of its responsibilities as US National Committee for the Scientific Committee on Antarctic Research (SCAR) of the International Council of Scientific Unins. Arctic and Antarctic activities are described.

  16. 40 CFR 35.107 - Work plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Work plans. 35.107 Section 35.107... ASSISTANCE Environmental Program Grants Preparing An Application § 35.107 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional Administrator...

  17. 40 CFR 35.507 - Work plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Work plans. 35.507 Section 35.507... ASSISTANCE Environmental Program Grants for Tribes Preparing An Application § 35.507 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the...

  18. Informal work and formal plans

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Kousgaard, Marius Brostrøm

    2012-01-01

    INTRODUCTION: Formal pathways models outline that patients should receive information in order to experience a coherent journey but do not describe an active role for patients or their relatives. The aim of this is paper is to articulate and discuss the active role of patients during their cancer...... and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. DISCUSSION: Work done by patients was invisible and not perceived as work....... The patients' requests were not sufficiently supported in the professional organisation of work or formal planning. Patients' insertion and use of information in their trajectories challenged professional views and working processes. And the design of the formal pathway models limits the patients' active...

  19. Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan summarizes last years planned water management program and actual CY 1983 water events. A more detailed summary is available in the CY 1983 Annual Water...

  20. 7 CFR 25.403. - Ongoing 2-year work plan requirement.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Ongoing 2-year work plan requirement. 25.403. Section... COMMUNITIES Post-Designation Requirements § 25.403. Ongoing 2-year work plan requirement. (a) Each Empowerment Zone and Enterprise Community shall prepare and submit annually, work plans for the subsequent...

  1. Annual water management plan - 1983-1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  2. Annual water management plan 1994-1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  3. Annual Water Management Plan, Part II

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a schedule...

  4. Pocosin Lakes National Wildlife Refuge : 2006 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2006 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  5. Pocosin Lakes National Wildlife Refuge : 2004 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2004 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  6. Pocosin Lakes National Wildlife Refuge : 2000 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2000 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  7. Pocosin Lakes National Wildlife Refuge : 2002 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2002 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  8. Pocosin Lakes National Wildlife Refuge : 2003 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2003 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  9. Pocosin Lakes National Wildlife Refuge : 2001 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2001 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  10. Pocosin Lakes National Wildlife Refuge : 1999 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 1999 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  11. Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The primary goal of the annual water plan is to set a strategy for the most efficient use of the available water delivered to Stillwater WMA. For all practical...

  12. Annual Burn Plan FY 94 : Brussels District Mark Twain NWR

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual burn plan for the Brussels District of Mark Twain NWR provides proposals for the Calhoun Division and the Gilbert Lake Division. Each proposal includes a...

  13. Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The primary goal of the annual water plan is to set a strategy for the 'most efficient use of the available water delivered to Stillwater WMA. For all practical...

  14. Pocosin Lakes National Wildlife Refuge : 2005 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2005 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  15. Behavior Plan, Does It Work?

    Science.gov (United States)

    Gonzalez, Blanca M.; Brown, D.

    2015-01-01

    As educators, we are responsible for teaching academic skills. However, some students not only need to learn academic skills but they need behavior support, due to problematic behaviors that are happening in the school setting. In this article, we will learn more of what are the implications, requirements and best strategies for a behavior plan.…

  16. A Marketing Plan That Works

    Science.gov (United States)

    Sparks, Jack D.

    1976-01-01

    Olivet College's marketing plan included survey of students, alumni, townspeople, and doners and analysis of the college's customer appeal, prices, and product mix. The author reports that the marketing objectives are being met and discusses the rationale and problems of applying business marketing principles to education. (JT)

  17. Making Schools Work. 2010 Annual Report

    Science.gov (United States)

    New Mexico Public Education Department, 2010

    2010-01-01

    The New Mexico Public Education Department 2010 Annual Report was created as a way to reflect on the accomplishments in education that occurred under Governor Bill Richardson's administration from 2002-2010. In 2003, the Governor outlined a reform agenda and pledged his commitment to improve education in New Mexico. In the fall of 2003, Governor…

  18. Bottom Up Succession Planning Works Better.

    Science.gov (United States)

    Stevens, Paul

    Most succession planning practices are based on the premise that ambitious people have and want only one career direction--upwardly mobile. However, employees have 10 career direction options at any stage of their working lives. A minority want the career action requiring promotion. Employers with a comprehensive career planning support program…

  19. 2010 Cooperative Initial Attack Annual Operating Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objective of this plan is to provide a pre-approved system to coordinate efforts and exchange or utilize resources for the prevention, detection, and...

  20. A compliance focus on the 2006 OIG Work Plan.

    Science.gov (United States)

    Hammon, Marilyn

    2006-01-01

    To determine which areas of professional billing present the highest risk to your practice, it is recommended that physicians and their office staff review the Office of Inspector General's (OIG) annual Work Plan. The Work Plan details areas for increased scrutiny by the federal government due to a high rate of inappropriate billing, which has cost the Medicare program millions of dollars. The OIG's Work Plan for Fiscal Year 2006 identifies several new areas of investigation, but what is more curious is what is not on the OIG Work Plan for 2006. For the first time in several years, this year's Work Plan does not include investigations into evaluation and management services (E/M), including the controversial consultation codes. But don't let your guard down on E/M documentation as our local Medicare carrier has stated they will begin a widespread probe review into the hospital admit CPT code 99222. Documentation to support the billing of CPT 99222 must include a comprehensive history (including ten review of systems); a comprehensive examination of eight or more organ systems for the 1995 guidelines or two elements from each of nine systems of a 1997 multisystem exam; and moderate decision making. Medicare will also be requesting reviews on subsequent inpatient hospital care codes, CPT 99231, 99232 and 99233.

  1. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  2. Burn site groundwater interim measures work plan.

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Jonathan L. (North Wind, Inc., Idaho Falls, ID); Hall, Kevin A. (North Wind, Inc., Idaho Falls, ID)

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  3. 1989 Annual water management report 1990 Annual water management plan : Ruby Lake National Wildlife Refuge : Ruby Valley Nevada

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1989 Annual Water Management Report 1990 Annual Water Management Plan. Includes 1989 weather summary, water availability forecast, summary of 1989...

  4. Ruby Lake National Wildlife Refuge : Ruby Valley Nevada : 1992 Annual water management report 1993 Annual water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1992 Annual Water Management Report 1993 Annual Water Management Plan. Includes summary of 1992 weather, 1992 water levels, water availability forecast...

  5. 1990 Annual water management report 1991 Annual water management plan : Ruby Lake National Wildlife Refuge : Ruby Valley Nevada

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1990 Annual Water Management Report 1991 Annual Water Management Plan. Includes 1990 weather summary, water availability forecast, summary of 1990...

  6. Ruby Lake National Wildlife Refuge : Ruby Valley Nevada : 1991 Annual water management report 1992 Annual water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1991 Annual Water Management Report 1992 Annual Water Management Plan. Includes Ruby Lake 1991 weather summary, summary of 1991 water levels, water...

  7. ICDF Complex Remedial Action Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  8. Housekeeping category corrective action unit work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  9. Production, staff, working time and financial planning

    Directory of Open Access Journals (Sweden)

    Orlando Boiteux

    2009-07-01

    Full Text Available Aggregate planning can be a tool for coordinating the tactical decisions belonging to some functional areas of a company. This potential has been limited due to methodological and technical reasons, but nowadays it is possible to solve very sophisticated models integrating, with a high level of detail, a great number of decisions of several functional areas and that permit to include new management schemes. In this paper, a production, staff, working time and cash management model is introduced.

  10. Main points for 1991 family planning work.

    Science.gov (United States)

    1991-06-01

    The main points for 1991 Family Planning (FP) Work in China are discussed as follows: 1) strengthen leadership, 2) strengthen grass roots buildup, 3 intensify population plan management and improve the responsibility system, 4) strengthen publicity and promote population and FP education in rural areas, 5) strengthen and establish the legal system for FP management, 6) provide excellent contraceptive and birth control services, 7 perform inservice training conscientiously and technical secondary education earnestly, and 8) coordinate efforts among related departments. Leadership changes involve the 2 top leaders of the Communist Party Committees and governments at each level taking personal responsibility for the implementation of their local population plans and FP work. FP work must have a prominent place on all agendas. The FP service network needs to be accelerated in countries, townships, and villages and grass roots units strengthened in urban areas. Provinces, autonomous regions, and municipalities must work out their local population plans for 1991-95 and 1991-99 according to the national population target. Rational apportionment needs to be considered for prefectures and counties. The emphasis should be on timely and accurate feedback and statistical supervision. The 1990 national population census data should be used to inform everyone about the current population situation. Legal needs entail standardizing documentation and developing local laws and regulations within a comprehensive system. Improvements are needed in such areas as rules and regulations pertaining to the administration of charges for unplanned births, identification of disabled children and approval of the birth quota. Abortion and unplanned births are to be averted through prepregnancy management. The emphasis is on voluntary use of contraception by couples of childbearing age. Inservice training should improve the political, ideological, professional proficiency, and ability to

  11. New plan of strategy and organization. Annual report 1995; Ny strategisk plan og organisasjon. Aarsberetning 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The annual report from EFI (Norwegian Research Institute for Electricity) relates to an new strategic plan and organization of the institute. An example of this is the Research Council of Norway`s new R and D programme EFFEKT, which will be a major locomotive for research up to the year 2000. Topics are: EFI`s new strategic plan and organization; extracts from the Board`s annual report; extract from the accounts; diagnostic testing of circuit-breakers; breakdown and interruption statistics from the grid; power system reliability

  12. Wyoming Basin Rapid Ecoregional Assessment: Work Plan

    Science.gov (United States)

    Carr, Natasha B.; Garman, Steven L.; Walters, Annika; Ray, Andrea; Melcher, Cynthia P.; Wesner, Jeff S.; O’Donnell, Michael S.; Sherrill, Kirk R.; Babel, Nils C.; Bowen, Zachary H.

    2013-01-01

    The overall goal of the Rapid Ecoregional Assessments (REAs) being conducted for the Bureau of Land Management (BLM) is to provide information that supports regional planning and analysis for the management of ecological resources. The REA provides an assessment of baseline ecological conditions, an evaluation of current risks from drivers of ecosystem change, and a predictive capacity for evaluating future risks. The REA also may be used for identifying priority areas for conservation or restoration and for assessing the cumulative effects of a variety of land uses. There are several components of the REAs. Management Questions, developed by the BLM and partners for the ecoregion, identify the information needed for addressing land-management responsibilities. Conservation Elements represent regionally significant aquatic and terrestrial species and communities that are to be conserved and (or) restored. The REA also will evaluate major drivers of ecosystem change (Change Agents) currently affecting or likely to affect the status of Conservation Elements. We selected 8 major biomes and 19 species or species assemblages to be included as Conservation Elements. We will address the four primary Change Agents—development, fire, invasive species, and climate change—required for the REA. The purpose of the work plan for the Wyoming Basin REA is to document the selection process for, and final list of, Management Questions, Conservation Elements, and Change Agents. The work plan also presents the overall assessment framework that will be used to assess the status of Conservation Elements and answer Management Questions.

  13. Participatory planning intercultural: Reflections for social work

    Directory of Open Access Journals (Sweden)

    Esperanza Gómez Hernández

    2012-01-01

    Full Text Available Since the nineties, participatory planning has emerged as a linking strategy for various social, political, economic and cultural sectors that assessed it as a potential for building consensus in the making of local processes forsocial improvement. Similarly, it was legitimized as a setting for practice for professionals trained in the social sciences, mainly Social Work. This article, from a geopolitical and geo-cultural perspective, presents contextual elements that determined the configuration of participatory planning in Latin America. These elements shall be staged in order to redefine diversity and the intercultural perspective that has been linked to this mobilizing strategy, against the institutionalized discourse of development and for the emergence of crisis and ruptures with this social paradigm from other practices and worldviews of life in the territories.

  14. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  15. 1989 Annual water management plan : Ruby Lake National Wildlife Refuge : Ruby Valley Nevada

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1988 Annual Water Management Report 1989 Annual Water Management Plan. Includes 1988 weather summary, water availability forecast, summary of 1988...

  16. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  17. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  18. 77 FR 47373 - Fiscal Year 2012 Draft Work Plan; Correction

    Science.gov (United States)

    2012-08-08

    ... Year 2012 Draft Work Plan; Correction AGENCY: Denali Commission. ACTION: Notice; second correction..., concerning request for comments on the Draft Work Plan for Federal Fiscal Year 2012. This revision to Fiscal Year 2012 Work Plan is to provide clarifying edits. In particular, Section 304(b)(3) of the...

  19. 23 CFR 450.308 - Funding for transportation planning and unified planning work programs.

    Science.gov (United States)

    2010-04-01

    ... Federal planning funds. (f) Administrative requirements for UPWPs and simplified statements of work are... 23 Highways 1 2010-04-01 2010-04-01 false Funding for transportation planning and unified planning... TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning...

  20. 1993 Annual Water Management Plan: Mark Twain National Wildlife Refuge: Wapello District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 1993 Annual Mark Twain NWR- Wapello District Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose...

  1. Optimal Model and Solution of Railway Hub Shift Working Plan

    Institute of Scientific and Technical Information of China (English)

    He Shiwei; Zhu Songnian; Lin Boliang

    1996-01-01

    Aiming at decreasing the hub transportation costs, a railway hub shift working plan in terms of multicommodity network flow model is set up for considering the coordination of freight working, train working and locomotive working plans. The solution and the calculating results are also introduced.

  2. Training Planning and Working Memory in Third Graders

    Science.gov (United States)

    Goldin, Andrea Paula; Segretin, Maria Soledad; Hermida, Maria Julia; Paz, Luciano; Lipina, Sebastian Javier; Sigman, Mariano

    2013-01-01

    Working memory and planning are fundamental cognitive skills supporting fluid reasoning. We show that 2 games that train working memory and planning skills in school-aged children promote transfer to 2 different tasks: an attentional test and a fluid reasoning test. We also show long-term improvement of planning and memory capacities in…

  3. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) of riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.

  4. Designing a marketing plan that works.

    Science.gov (United States)

    Dienemann, J A; Wintz, L

    1992-01-01

    As healthcare organizations incorporate marketing strategies into daily operations, nurse executives find themselves involved in the process with varying degrees of comfort and success. The authors discuss the nurse executive's role and responsibilities for the success of a marketing plan and describe the importance of recognizing how far marketing has evolved within an organization in order to design a suitable plan successfully.

  5. Optimizing Rank of Landscape Planning Works of Urban Wetland Park

    Institute of Scientific and Technical Information of China (English)

    Qiao Li-fang; Zhang Yi-chuan; Qi An-guo; Li Xin-zheng

    2012-01-01

    Classifying and ranking the huge amounts of landscape planning works of urban wetland park is always difficult due to the multi-functions (ecological, leisure, educational and disaster prevention) of the urban wetland park. Therefore, an optimizing rank system is urgently needed. Analytic Hierarchy Process (AHP) and Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) models were used to rank the planning works of 30 urban wetland park based on four mainly factors, which included landscape ecological planning, landscape planning, ecological planning and economic planning. The study indicated that the AHP- TOPSIS model had good discrimination in the classification and ranking of landscape planning works of urban wetland park and it was also applicable to the planning works of other urban greenbelts.

  6. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Science.gov (United States)

    2010-01-01

    ... construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and construction work plans (CWPs) in form and substance as set forth in 7 CFR part 1710, subpart F. (b... 7 Agriculture 11 2010-01-01 2010-01-01 false Long-range engineering plans and construction...

  7. Reflexive Planning as Design and Work

    DEFF Research Database (Denmark)

    Lissandrello, Enza; Grin, John

    2011-01-01

    In recent years, planning theorists have advanced various interpretations of the notion of reflexivity, inspired by American pragmatism, complexity theory, hermeneutics, discursive and collaborative planning. Scholars agree that “reflexivity” has a strong temporal dimension: it not only aims...... to solve present planning problems, but to imagine and understand alternative trajectories for future action. This article explores the practical utility of reflexivity for planners, through a case study that focuses on a project to promote sustainable development in the Port of Amsterdam. Reflexivity...... in planning emerges as a new tool for generating critical knowledge and dialogue that can synthesise the perspectives of multiple actors in a common understanding, existing structural constraints and a collective imagination of alternative future possibilities. Such research highlights the potential...

  8. University of West Florida Work Plan, 2013-2014

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new Strategic Plan 2012-2025 is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's Annual Accountability Report provides yearly tracking for how the System is…

  9. Is the 2014 Office of Inspector General Work Plan keeping you up at night?

    Science.gov (United States)

    Schaum, Kathleen D

    2014-05-01

    Wound care providers should do everything possible to prevent becoming a target for OIG investigations, which will surely keep them up at night. The best way to get a good night’s sleep is to follow the most current coding, payment, coverage, and documentation regulations that pertain to your business. Then, consider the focus areas of the annual OIG Work Plan as “ a heads-up.” If you wish to read the entire 2014 OIG Work Plan, you can find it at http://www.oig.hhs.gov.

  10. Does California's Master Plan Still Work?

    Science.gov (United States)

    Burdman, Pamela

    2009-01-01

    For nearly 50 years, California's higher education system has been shaped by the tripartite division of the vaunted Master Plan. The 1960 document's bold vision of access and quality safeguarded a system of selective research universities (the University of California) and provided baccalaureate education through less-selective campuses (the…

  11. Low-temperature thermal energy storage program annual operating plan

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, H. W.; Eissenberg, D. M.

    1979-01-01

    The LTTES program operating plans for FY 1978 are described in terms of general program objectives and the technical activities being implemented to achieve these objectives. The program structure provides emphasis on several principal thrusts; namely, seasonal thermal storage, daily/short-term thermal storage, and waste heat recovery and reuse. A work breakdown structure (WBS) organizes the efforts being carried out in-house or through subcontract within each thrust area. Fiscal data are summarized in respect to thrust area, individual efforts, and funding source.

  12. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  13. Reduced waste generation technical work plan

    Energy Technology Data Exchange (ETDEWEB)

    1987-05-01

    The United States Department of Energy has established policies for avoiding plutonium losses to the waste streams and minimizing the generation of wastes produced at its nuclear facilities. This policy is evidenced in DOE Order 5820.2, which states Technical and administrative controls shall be directed towards reducing the gross volume of TRU waste generated and the amount of radioactivity in such waste.'' To comply with the DOE directive, the Defense Transuranic Waste Program (DTWP) supports and provides funding for specific research and development tasks at the various DOE sites to reduce the generation of waste. This document has been prepared to give an overview of current and past Reduced Waste Generation task activities which are to be based on technical and cost/benefit factors. The document is updated annually, or as needed, to reflect the status of program direction. Reduced Waste Generation (RWG) tasks encompass a wide range of goals which are basically oriented toward (1) avoiding the generation of waste, (2) changing processes or operations to reduce waste, (3) converting TRU waste into LLW by sorting or decontamination, and (4) reducing volumes through operations such as incineration or compaction.

  14. 1991-92 Annual Trapping Plan: Mark Twain National Wildlife Refuge, Clarence Cannon National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Trapping Plan for the 1991-1992 trapping season at Mark Twain and Clarence Cannon NWRs outlines rules and regulations for the trapping of beaver and...

  15. 1989-90 Annual Trapping Plan: Mark Twain National Wildlife Refuge, Clarence Cannon National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Trapping Plan for the 1989-90 trapping season at Mark Twain and Clarence Cannon NWRs outlines rules and regulations for the trapping of beaver and...

  16. 1990-91 Annual Trapping Plan: Mark Twain National Wildlife Refuge, Clarence Cannon National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Trapping Plan for the 1990-91 trapping season at Mark Twain and Clarence Cannon NWRs outlines rules and regulations for the trapping of beaver and...

  17. Crescent Lake/North Platte National Wildlife Refuge Complex annual habitat management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Crescent Lake/North Platte National Wildlife Refuge Complex Annual Habitat Management Plan provides a year long vision and specific guidance on managing habitats...

  18. CASI Work Plan: Calendar Year 2013

    Science.gov (United States)

    2013-02-15

    8, July 2012, http://acwc.sdp.sirsi.net/client/search/asset/1007740 BIM ( Building Information Model ) is the process of generating and managing...AWRA American Water Resources Association AWWA American Water Works Association BIM Building Information Model BO Biological Opinion C&D Construction...issues. Publications and Presentations Emerging Challenges and Opportunities in Building Information Modeling for the US Army Installation

  19. Marine radioecology. Annual report 1996. Project plan 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The project plan for the EKO-1 project states that `the main aim of the EKO-1 project is to enable faster and better assessments to be made of the effects of releases of radionuclides into the marine environment`. To meet this goal the main parts of the project were defined as follows: Model work - Identifying parameters of main interest including estimating and validating the values of these parameters; Research - Field studies, environments typical for various Nordic regions, environments with special physical or chemical characteristics. Laboratory studies; Dissemination of information - Seminars, reports, articles. During the project period emphasis has also been put on quality issues concerning sampling and analysis. The project work has progressed in accordance with project plans in 1996 and within the set budget. In modelling a parameter sensitivity analysis was carried out for a radiological assessment model used for the prediction of doses to man from dumping of radioactive waste in the Kara Sea. Doses to man were found to be generally dominated by contributions from long-lived transuranic radionuclides (plutonium and americium) which associate readily with sediments. Sediment related processes and parameters show therefore high sensitivities, especially at long distances (e.g. Barents Sea). Within the EKO-1 project there has been emphasis on encouraging the Nordic aspect of sediment research in spite of the limitations set by nationally run sampling projects. The EKO-1 project has managed this by e.g.: Organizing exchange of samples for analysis links with the EKO-2.3 project (`Limnic systems`). (EG) 52 refs.

  20. Work hazard prevention plans; Plan de prevencion de riesgos laborales

    Energy Technology Data Exchange (ETDEWEB)

    Albertos Campos, F.

    2009-07-01

    The prevention of industrial risks is a constantly evolving discipline that has changed considerable in the last 25 years. The Cofrentes Nuclear Power Plants has always been operated with a clear policy favoring prevention by supporting the principle of its integration, i. e., that the hierarchical functional organization of the company make sure that industrial risk prevention is effective and that health and safety standards are met. The historical evolution of occupational safety in the Cofrentes Nuclear Power Plant shows a a clear trend towards improvement and is the results of many years of hard work and effort by the plants own and contractor personnel in the field of industrial risk prevention. (Author)

  1. The Action Plan Against Repetitive Work - An Industrial Relation Strategy for Improving the Working Environment

    DEFF Research Database (Denmark)

    Hasle, Peter; Møller, Niels

    2001-01-01

    indicates that a measurable reduction of repetitive work has been achieved, while recognizing the the new management strategies focusing on human resources development have also played an important role. These results are used to suggest that - under certain conditions - a combination of state regulation......The Danish Action Plan against Repetitive Work is presented and discussed as a possible new strategy for regulating repetitive work as well as other complicated working environment problems. The article is based on an empirical evaluation ot the Action Plan. The asseessment of the Action Plan...... and industrial relation agreements can be used to regulate other working environment problems....

  2. Individualism-Collectivism: Links to Occupational Plans and Work Values

    Science.gov (United States)

    Hartung, Paul J.; Fouad, Nadya A.; Leong, Frederick T. L.; Hardin, Erin E.

    2010-01-01

    Individualism-collectivism (IC) constitutes a cultural variable thought to influence a wide variety of variables including career planning and decision making. To examine this possibility, college students (216 women, 106 men, 64% racial-ethnic minorities) responded to measures of IC, occupational plans, and work values. Multivariate analysis of…

  3. Annual Water Management Plan White River National Wildlife Refuge 1991

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule...

  4. Annual Water Management Plan Wheeler National Wildlife Refuge 1997

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  5. Annual Water Management Plan Wheeler National Wildlife Refuge 1998

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  6. Annual Water Management Plan Wheeler National Wildlife Refuge 2000

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  7. Annual Water Management Plan Wheeler National Wildlife Refuge 1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  8. Annual Water Management Plan White River National Wildlife Refuge 1990

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule...

  9. 75 FR 70625 - Annual Funding Notice for Defined Benefit Plans

    Science.gov (United States)

    2010-11-18

    ... liabilities or assets for the year, as well as a projection to the end of such plan year of the effect of the... difficult to find meaning in the phrase ``a projection to the end of such year'' if ``current plan year'' is... service; an offer by the plan for a temporary period to permit participants to retire at benefit...

  10. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  11. Annual research plan, 1983-84. [Organic compounds derived from fossil substances

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-05-01

    The National Institute for Petroleum and Energy Research (NIPER) resulted from efforts by the Department of Energy (DOE) to ensure the continuity of the unique energy research capabilities that had been developed at the Bartlesville Energy Technology Center (BETC) over the past 65 years. This was accomplished by a Cooperative Agreement between DOE and IIT Research Institute (IITRI). The agreement to operate NIPER for the five fiscal years 1984-88 became effective October 1, 1983. The NIPER Annual Research Plan for 1983-84 consists of eight projects in the Base Program and 13 projects in the Optional Program. A sampling of potential Work for Others projects is also presented. The Base Program consists of five EOR and three Fundamental Petroleum Chemistry projects. The Optional Program has three EOR projects, one Unconventional Gas Recovery project, five APT projects, and four Advanced Utilization Research projects.

  12. 1997 annual ground control operating plan for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    This plan presents background information and a working guide to assist Mine Operations and Engineering in developing strategies for addressing ground control issues at the Waste Isolation Pilot Plant (WIPP). With the anticipated receipt of waste in late 1997, this document provides additional detail to Panel 1 activities and options. The plan also serves as a foundation document for development and revision of the annual long-term ground control plan. Section 2.0 documents the current status of all underground excavations with respect to location, geology, geometry, age, ground support, operational use, projected life, and physical conditions. Section 3.0 presents the methods used to evaluate ground conditions, including visual observations of the roof, ribs, and floor, inspection of observation holes, and review of instrumentation data. Section 4.0 lists several ground support options and specific applications of each. Section 5.0 discusses remedial ground control measures that have been implemented to date. Section 6.0 presents projections and recommendations for ground control actions based on the information in Sections 2.0 through 5.0 of this plan and on a rating of the critical nature of each specific area. Section 7.0 presents a summary statement, and Section 8.0 includes references. Appendix A provides an overview and critique of ground control systems that have been, or may be, used at the site. Because of the dynamic nature of the underground openings and associated geotechnical activities, this plan will be revised as additional data are incorporated.

  13. DETERMINING THE EDUCATION NEEDS OF TEACHERS IN THE PREPATION OF ANNUAL, UNITE AND DAILY PLANS

    Directory of Open Access Journals (Sweden)

    Gizem BAKAY

    2007-12-01

    Full Text Available This research prepared for establish teachers needs for prepare annual, unite and daily plan. Duringthe research, we use collage teachers and we prepared this survey for collect datas and to determine their needs. We use SPSSprograme with percentage tecnique (% for analyze datas. At the result, in this collage teachers need education for prepareannual and unite plans and they aren’t need any training for prepare daily plan

  14. Agricultural planning of annual plants under demand, maturation, harvest, and yield risk

    OpenAIRE

    Çömden, Nihan; Tan, Barış

    2012-01-01

    In this study we present a planning methodology for a firm whose objective is to match the random supply of annual premium fruits and vegetables from a number of contracted farms and the random demand from the retailers during the planning period. The supply uncertainty is due to the uncertainty of the maturation time, harvest time, and yield. The demand uncertainty is the uncertainty of weekly demand from the retailers. We provide a planning methodology to determine the farm areas and the se...

  15. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  16. SNL/CA Environmental Planning and Ecology Program Annual Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2007-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  17. Annual report on contractor work force restructuring, fiscal year 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This report summarizes work force restructuring and community transition activities at all sites. It outlines work force restructuring activity for FY 1997, changing separation patterns, cost savings and separation costs, program assessment, activities to mitigate restructuring impacts, community transition activities, status of displaced workers, lessons learned, and emerging issues in worker and community transition. Work force restructuring and community transition activities for defense nuclear sites are summarized, as are work force restructuring activities at non-defense sites.

  18. Sandia SWiFT Site Safe Work Planning Manual.

    Energy Technology Data Exchange (ETDEWEB)

    White, Jonathan

    2016-02-01

    The Department of Energy's Scaled Wind Farm Technology (SWiFT) facility provides research site with multiple wind turbines at a scale useful for the experimental study of wake dynamics, advanced rotor development, turbine control, and advanced sensing for production-scale wind farms. Safety of workers and the public is the top and overriding priority at SWiFT. Central to safe operations are formal planning processes . This manual provides an overview of test planning and work planning processes and requirements in adherence with the Sandia corporate Engineered Safety Work Planning and Control process. It is required reading for all SWiFT site staff, Sandia workers, and collaborators who oversee, conduct, or participate in test activities or who are involved in modifying Sandia SWiFT site assets.

  19. C-Division annual review and operating plan, August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Morse, N.R.

    1990-11-01

    The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

  20. 1995 Annual Water Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 1995 Water Management Plan for Muscatatuck NWR begins by summarizing the 1994 Water Management Program. Management results for moist soil units, green tree...

  1. Modoc National Wildlife Refuge annual water management plan 1981

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The content of this plan includes water source, existing water supplies, problems, resume of water management for 1980, recommended water management for 1981, and...

  2. Modoc National Wildlife Refuge annual water management plan 1982

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The content of this plan includes water source, existing water supplies, problems, resume of water management for 1981, recommended water management for 1982, and...

  3. Corrective measures evaluation work plan : Tijeras Arroyo Groundwater : revision 0.

    Energy Technology Data Exchange (ETDEWEB)

    Wymore, Ryan A.; Collins, Sue S.; Skelly, Michael Francis; Koelsch, Michael C.

    2004-12-01

    This document, which is prepared as directed by the Compliance Order on Consent (COOC) issued by the New Mexico Environment Department, outlines a process to evaluate remedial alternatives to identify a corrective measure for the Sandia National Laboratories Tijeras Arroyo Groundwater (TAG). The COOC provides guidance for implementation of a Corrective Measures Evaluation (CME) for TAG. This Work Plan documents an initial screening of remedial technologies and presents a list of possible remedial alternatives for those technologies that passed the screening. This Work Plan outlines the methods for evaluating these remedial alternatives and describes possible site-specific evaluation activities necessary to estimate remedy effectiveness and cost. These methods will be reported in the CME Report. This Work Plan outlines the CME Report, including key components and a description of the corrective measures process.

  4. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    Energy Technology Data Exchange (ETDEWEB)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-12-31

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites` input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves.

  5. Savannah River Site Approved Site Treatment Plan, 1998 Annual Update

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B. [Westinghouse Savannah River Company, AIKEN, SC (United States); Berry, M.

    1998-03-01

    The U.S. Department of Energy, Savannah River Operations Office (DOE- SR),has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume I. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore,pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021.Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW.The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  6. Savannah River Site Approved Site Treatment Plan, 1998 Annual Update

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B.

    1999-04-20

    The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  7. Savannah River Site approved site treatment plan, 2000 annual update

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B.

    2000-04-20

    The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

  8. Final work plan for targeted sampling at Webber, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2006-05-01

    This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

  9. Tank waste remediation system multi-year work plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  10. Review of Taxation Work in 2005 and Plans for 2006

    Institute of Scientific and Technical Information of China (English)

    State Administration of Taxation

    2006-01-01

    @@ In 2005,China's total tax revenue topped 3.0866 trillion Yuan (excluding tariffs and agricultural taxes), up 20%and 514.8 billion Yuan over 2004 and exceeding 3 trillion Yuan for the first time. During the 10th five-year plan period,the total tax revenue remitted into the state coffer amounts to 10.9217 trillion Yuan, with an average annual increase of 19.5%; and the revenue in the fifth year more than doubles that in the first year. The fast and steady growth of the tax revenue in pace with the economic growth has greatly enhanced the country's financial strength and provided solid financial guarantee for the country's efforts to build a well-off society in an all-round way.

  11. Review of Taxation Work in 2005 and Plans for 2006

    Institute of Scientific and Technical Information of China (English)

    State; Administration; of; Taxation

    2006-01-01

      In 2005,China's total tax revenue topped 3.0866 trillion Yuan (excluding tariffs and agricultural taxes), up 20%and 514.8 billion Yuan over 2004 and exceeding 3 trillion Yuan for the first time. During the 10th five-year plan period,the total tax revenue remitted into the state coffer amounts to 10.9217 trillion Yuan, with an average annual increase of 19.5%; and the revenue in the fifth year more than doubles that in the first year. The fast and steady growth of the tax revenue in pace with the economic growth has greatly enhanced the country's financial strength and provided solid financial guarantee for the country's efforts to build a well-off society in an all-round way.……

  12. 5 CFR 2638.706 - Agency's written plan for annual ethics training.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Agency's written plan for annual ethics training. 2638.706 Section 2638.706 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS OFFICE OF GOVERNMENT ETHICS AND EXECUTIVE AGENCY ETHICS PROGRAM RESPONSIBILITIES Executive Agency...

  13. Technical Work Plan for: Fracture and Lithophysal Studies

    Energy Technology Data Exchange (ETDEWEB)

    n

    2006-09-11

    The primary objective of the work scope described in this technical work plan (TWP) is to enhance the descriptions of fracture and lithophysal parameters for the repository host horizon (RHH) over the repository footprint utilizing a predictive model. This work is planned to address U.S. Nuclear Regulatory Commission (NRC) additional information needs (AINs) associated with the Structural Deformation and Seismicity (SDS) Key Technical Issues (KTI) agreement SDS 3.03 (Schlueter 2000 [DIRS 166615]). The results of the planned work are expected to enhance the technical basis and confirm the results of the fracture analyses presented in ''Drift Degradation Analysis'' (BSC 2004 [DIRS 166107], Section 6.1.6). This model is not intended to provide an alternative for the unsaturated zone and saturated zone flow and transport models currently used by the Yucca Mountain Project (YMP). Nor are the outputs of this model intended to address the SDS 3.03 AINs related to the unsaturated zone and saturated zone flow and transport models.

  14. Planning and Evaluating Educational Work in Slovene Preschools

    Directory of Open Access Journals (Sweden)

    Marcela Batistič Zorec

    2012-01-01

    Full Text Available The present article examines the changes in Slovene preschools subsequent to Slovenia’s independence in 1991. In the socialist period, the national education programme for preschools was highly structured, goaland content-oriented and subject to schoolization. The Curriculum for Preschools (1999 brought conceptual changes towards education “based on the child” and the process approach, as well as giving more autonomy to preschool teachers and their assistants. In the empirical study, we examine changes in planning and evaluating educational work compared to the past. The results show that the majority of professional workers have reduced the high level of structure and rigidity in planning, and that there is better cooperation between preschool teachers and teachers’ assistants. Unlike in the past, most professional workers regularly evaluate their educational work. As the data was gathered in two phases, before and after the training of professional workers in the Reggio Emilia concept, we also search for the (probably indirect influencesof this training. We conclude that after the training the participation of children in planning and evaluating educational work is higher.

  15. 20 CFR 411.450 - What is an Individual Work Plan?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false What is an Individual Work Plan? 411.450... PROGRAM Requirements For Individual Work Plans § 411.450 What is an Individual Work Plan? An individual work plan (IWP) is a required written document signed by an employment network (EN) (other than a...

  16. Plans that Work: (Excerpt from "Before Crisis Hits: Building a Strategic Crisis Plan")

    Science.gov (United States)

    Smith, Larry L.; Millar, Dan P.

    2005-01-01

    There are close to 1,200 community colleges in the United States, and their level of crisis preparation ranges from very thorough to not prepared at all. A survey of American Association of Community Colleges membership found a number of community colleges that not only had good crisis plans but were proud of the work that had gone into them and…

  17. 7 CFR 1710.252 - Construction work plans-power supply borrowers.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Construction work plans-power supply borrowers. 1710... LOANS AND GUARANTEES Construction Work Plans and Related Studies § 1710.252 Construction work plans..., environmental and other studies and plans needed to support the construction of facilities, when such cost...

  18. Proceedings of the Thirteenth Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    Wardrip, S. C.

    1982-01-01

    Proceedings of an annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting are summarized. A transparent view of the state-of-the-art, an opportunity to express needs, a view of important future trends, and a review of relevant past accomplishments were considered for PTTI managers, systems engineers, and program planner. Specific aims were: to provide PTTI users with new and useful applications, procedures, and techniques; to allow the PTTI researcher to better assess fruitful directions for research efforts.

  19. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  20. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  1. Natural family planning works in a Bukidnon town.

    Science.gov (United States)

    Toledo, R

    1983-01-01

    Natural family planning is being actively promoted in a pineapple plantation of the Philippine Packing Corporation (PPC) located in northern Bukidnon province. Prospective acceptors attend 4 seminars which cover sex education and instruction on natural family planning methods. The goal of the program is family life and marriage enrichment rather than family size limitation. Thus, there is no target number of acceptors. Early acceptors used the basal body temperature method, but this was subsequently replaced by the sympto-thermal method. Participants report that the close observation of physical changes required by the natural family planning method has enabled them to be more aware of their bodies and more appreciative of themselves. Laypersons work closely with acceptor couples. There are 6 fulltime grassroots motivators and 23 camp motivators. Affiliated with the Family Life Commission of the Catholic Bishops Conference of the Philippines, the program is also supported by the Phillips Memorial Hospital and is part of the PPC's barrio assistance program. The corporation actively supports self-help projects in the plantation areas.

  2. Will a Quota Plan for Asylum Seekers Plan Work —and Why Not?

    DEFF Research Database (Denmark)

    Seeberg, Peter

    2015-01-01

    The article describes the recent situation in the Mediterranean, where the number of asylum seekers arriving from countries south and east of the Mediterranean Sea is increasing significantly. The European Commission has suggested a plan, “A European Agenda on Migration”, which will redistribute...... the EU-Commission of a mandatory quota plan for asylum seekers will not work, because too many states will pretend, that the problem does not really belong to them. They fear that accepting a system according to which each state has to accept a fixed quota of asylum seekers in a recent context might...

  3. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  4. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  5. 45 CFR 261.63 - When is a State's Work Verification Plan due?

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false When is a State's Work Verification Plan due? 261... When is a State's Work Verification Plan due? (a) Each State must submit its interim Work Verification Plan for validating work activities reported in the TANF Data Report and, if applicable, the...

  6. 76 FR 14995 - Comment Request for Information Collection for Work-Flex Plan Submission and Reporting...

    Science.gov (United States)

    2011-03-18

    ... Request for Information Collection for Work-Flex Plan Submission and Reporting Requirements; Extension... data about the Work Flex Plan Submission and Reporting Requirements. A copy of the proposed information... five years pursuant to a Work-Flex Plan submitted by a state. Under Work-Flex, governors are...

  7. Hutton Lake NWR, Mortenson Lake NWR, and Bamforth Lake NWR : Annual water management plans, 2004 water use report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Water use reports for 2004 and annual water management plans for 2005 for Mortenson Lake National Wildlife Refuge, Hutton Lake National Wildlife Refuge, and Bamforth...

  8. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2012-07-15

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining

  9. 2017 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Stacy R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-02-01

    The 2017 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base has been prepared in accordance with the “Letter of Agreement Between Department of Energy, National Nuclear Security Administration, Sandia Field Office (DOE/NNSA/SFO) and 377th Air Base Wing (ABW), Kirtland Air Force Base (KAFB) for Terrestrial Sampling” (signed January 2017), Sandia National Laboratories, New Mexico (SNL/NM). The Letter of Agreement requires submittal of an annual terrestrial sampling plan.

  10. Repository-Based Software Engineering Program: Working Program Management Plan

    Science.gov (United States)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  11. Generating technology assessment. Phase I work plan, Task 1 report

    Energy Technology Data Exchange (ETDEWEB)

    1979-10-15

    A plan of work outlining information to assess electric generating technologies is presented. Projections are made of realistic and understandable engineering and cost assessments of nonnuclear electrical generating technologies. A computer-based method of producing such engineering and cost estimates for use by EIA's Coal and Electric Power Analysis Division is to be developed and implemented. Technologies and processes to be assessed are: all nonnuclear conventional and nonconventional (coal gasification, advanced combustion turbines, atmospheric fluidized bed combustion, fuel cells, geothermal, solar thermal and photovoltaics, biomass conversion to electricity, ocean thermal, wind, and MHD). Engineering specifications recommended for determination are listed. Compatibility of the technologies are to be assessed with EIA models: MEFS, LEAP, and NCM.

  12. 75 FR 37790 - Lauryl Sulfate Salts; Antimicrobial Registration Review Final Work Plan and Proposed Registration...

    Science.gov (United States)

    2010-06-30

    ... AGENCY Lauryl Sulfate Salts; Antimicrobial Registration Review Final Work Plan and Proposed Registration.... SUMMARY: This notice announces the availability of EPA's final work plan and proposed registration review... with the posting of a summary document, containing a preliminary work plan, for public comment....

  13. 7 CFR 1710.209 - Approval requirements for load forecast work plans.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Approval requirements for load forecast work plans... LOANS AND GUARANTEES Load Forecasts § 1710.209 Approval requirements for load forecast work plans. (a... utility plant of $500 million or more must maintain an approved load forecast work plan. RUS...

  14. 75 FR 57782 - Registration Review; Pesticide Dockets Opened for Review and Comment; Amended Work Plan for...

    Science.gov (United States)

    2010-09-22

    ... AGENCY Registration Review; Pesticide Dockets Opened for Review and Comment; Amended Work Plan for... announcing the availability of an amended final work plan for the registration review of the pesticide..., EPA is announcing the availability of an amended final work plan for the registration review...

  15. Annual Conference of China City Planning 2012 & First Meeting of Second Editorial Board of China City Planning Review Held in Kunmin

    Institute of Scientific and Technical Information of China (English)

    QIAN Fang

    2012-01-01

    <正>On Oct. 17, 2012, the Annual Conferenceof China City Planning 2012 that was cohosted by Urban Planning Society of China (UPSC) and Kunming Municipal Government, in collaboration with the Department of Housing and Urban-Rural Development of Yunnan, and sponsored by Kunming Planning Bureau was launched in Yunnan Convention Center, with the theme of "Di-versity and Inclusiveness" WANG Guang-tao, Chairman of Environment Protection and Resources Conservation

  16. 77 FR 30266 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford...

    Science.gov (United States)

    2012-05-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford Federal... the ICR plan formula for 2012. Under the William D. Ford Federal Direct Loan (Direct Loan)...

  17. 77 FR 20796 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford...

    Science.gov (United States)

    2012-04-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford Federal... the ICR plan formula for 2011. Under the William D. Ford Federal Direct Loan (Direct Loan)...

  18. Proceedings of the 7th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    1975-01-01

    The Proceedings contain the papers presented at the Seventh Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting and the edited record of the discussion period following each paper. This meeting provided a forum to promote more effective, efficient, economical and skillful applications of PTTI technology to the many problem areas to which PTTI offers solutions. Specifically the purpose of the meeting is to: disseminate, coordinate, and exchange practical information associated with precise time and frequency; acquaint systems engineers, technicians and managers with precise time and frequency technology and its applications; and review present and future requirements for PTTI.

  19. The 22nd Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    Sydnor, Richard L. (Editor)

    1990-01-01

    Papers presented at the 22nd Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting are compiled. The following subject areas are covered: Rb, Cs, and H-based frequency standards and cryogenic and trapped-ion technology; satellite laser tracking networks, GLONASS timing, intercomparison of national time scales and international telecommunications; telecommunications, power distribution, platform positioning, and geophysical survey industries; military communications and navigation systems; and dissemination of precise time and frequency by means of GPS, GLONASS, MILSTAR, LORAN, and synchronous communication satellites.

  20. College of Saint Benedict: A Planning Model That Works

    Science.gov (United States)

    Escher, Sister Firmin

    1976-01-01

    This Catholic college for women in St. Joseph, Minnesota, is adopting components of systematic institutional development in its planning and budgeting. Four programs are integrated: institutional research, the management information system, management development, and management planning. (LBH)

  1. Interim measure work plan/design for Agra, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2008-11-18

    This Interim Measure Work Plan/Design (IMWP/D) is supplemental to the Argonne document Interim Measure Conceptual Design for Remediation of Source Area Contamination at Agra, Kansas. The IMWP/D includes information required by Kansas Department of Health and Environment (KDHE) Policy BER-RS-029, Policy and Scope of Work for Interim Measures. Specific to Policy BER-RS-029 is the requirement for several documents that will ensure that an adequate amount and type of data are collected for implementation of the IMWP/D and that data quality and safe conditions are prevailed. Such information is included in the IMWP/D as follows: Appendix A: Data Acquisition Plan--Design Testing Requirements; Appendix B: Basis of Design; Appendix C: Permits; Appendix D: Quality Assurance Project Plan; Appendix E: Health and Safety Plan; and Appendix F: Operations, Maintenance, and Monitoring Schedule. The proposed remedial technology for this project is the installation of five large-diameter boreholes (LDBs) in a source area that has been identified on the property formerly used for grain storage by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The goal of the LDB technology is the remediation of the source area by removal of mass quantities of contaminated soil from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. Secondary to the soil remediation is the remediation of groundwater at and adjacent to the source areas. The LDB technology serves the following purposes: (1) The physical removal of contaminated soil from the identified source area. (2) Replacement of less permeable native materials (silty clay, clayey silt, and silty sand) with more permeable materials to facilitate the capture of volatilized contaminants in the vertical borehole. (3) Removal of contaminants volatilized by air sparging (AS) and extracted from the

  2. Final Work Plan: Phase I Investigation at Bladen, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division. Applied Geosciences and Environmental Management Section; Yan, Eugene [Argonne National Lab. (ANL), Argonne, IL (United States). Environmental Science Division

    2014-07-01

    The village of Bladen is a town of population approximately 237 in the northwest part of Webster County, Nebraska, 30 mi southwest of Hastings and 140 mi southwest of Lincoln, Nebraska. In 2000, the fumigant-related compound carbon tetrachloride was detected in public water supply well PWS 68-1, at a trace level. Low-level contamination, below the maximum contamination level (MCL) of 5.0 μg/L, has been detected intermittently in well PWS 68-1 since 2000, including in the last sample taken in July 2013. In 2006, the village installed a new well, PWS 2006-1, that remains free of contamination. Because the carbon tetrachloride found in well PWS 68-1 might be linked to historical use of fumigants containing carbon tetrachloride at grain storage facilities, including its former facility in Bladen, the CCC/USDA is proposing an investigation to (1) delineate the source and extent of the carbon tetrachloride contamination potentially associated with its former facility, (2) characterize pathways and controlling factors for contaminant migration in the subsurface, and (3) establish a basis for estimating potential health and environmental risks. The work will be performed in accordance with the Intergovernmental Agreement established between the NDEQ and the Farm Service Agency of the USDA. The site investigation at Bladen will be implemented in phases, so that data collected and interpretations developed during each phase can be evaluated to determine if a subsequent phase of investigation is warranted and, if warranted, to provide effective guidance for the subsequent investigation activities. This Work Plan identifies the specific technical objectives and defines the scope of work proposed for the Phase I investigation by compiling and evaluating historical data. The proposed investigation activities will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research

  3. Chestnut Ridge Borrow Area Waste Pile work plan

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R. (Oak Ridge Y-12 Plant, TN (United States))

    1991-08-01

    The US Department of Energy (DOE), through its contractor Martin Marietta Energy Systems, Inc., has constructed a storage facility, the Chestnut Ridge Borrow Area Waste Pile (CRBAWP), for mercury-contaminated soil excavated from the Oak Ridge Civic Center properties and the Oak Ridge Sewer Line Beltway. Excavation of the soil from the Civic Center began in September 1984 and was completed in early 1985. Similar soils from other areas of the city were added to the pile until 1987. Approximately 3000 yd{sup 3} are stored at the present time. An Interim Status RCRA permit was initially sought for this facility. Samples from the waste pile passed the Extraction Procedure Toxicity Test (EP Tox). The Tennessee Department of Health and Environment (now the Tennessee Department of Conservation-TDC) denied the permit based on their conclusion that the waste was not a RCRA-regulated waste. On September 25, 1990 the Toxicity Characteristic Leaching Procedure (TCLP) superseded the EP Tox test. TCLP tests are not proposed to satisfy a request by TDC and to make a final determination of the nature of the soils in order to close the CRBAWP as a solid waste disposal facility under Tennessee State rule 1200-1-7-.04. The objectives of this work are to summarize existing site information and detail actions necessary to sample and characterize soils from the waste pile as hazardous or nonhazardous per the Toxicity Characteristic Leaching Procedure (TCLP). Within the scope of this plan, a site investigation will be discussed; a field sampling plan will be described in terms of sampling locations, procedures, and quality assurance; and ancillary activities such as waste management, data management, and health and safety will be outlines. 15 refs., 7 figs., 2 tabs.

  4. Studies in swarm intelligence techniques for annual crop planning problem in a new irrigation scheme

    Directory of Open Access Journals (Sweden)

    Adewumi, Aderemi Oluyinka

    2013-11-01

    Full Text Available Annual crop planning (ACP is an NP-Hard type optimisation problem in agricultural planning. It involves finding optimal solutions for the seasonal allocations of a limited amount of agricultural land among the various competing crops that need to be grown on it. This study investigates the effectiveness of employing three relatively new Swarm Intelligence (SI techniques in determining solutions to an ACP problem at a new irrigation scheme. The SI metaheuristics studied include Cuckoo Search (CS, Firefly Algorithm (FA, and Glow-worm Swarm Optimisation (GSO. The solutions determined by these SI techniques are compared against the solutions of Genetic Algorithm (GA, another population-based metaheuristic technique. This helps to determine the relative merits of the solutions found by the SI techniques. The results show that the SI algorithms delivered solutions superior to those of GA in determining solutions to the ACP problem at a new irrigation scheme.

  5. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  6. Final work plan for targeted investigation at Hilton, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-08-28

    This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

  7. Parents as Role Models: Parental Behavior Affects Adolescents' Plans for Work Involvement

    Science.gov (United States)

    Wiese, Bettina S.; Freund, Alexandra M.

    2011-01-01

    This study (N = 520 high-school students) investigates the influence of parental work involvement on adolescents' own plans regarding their future work involvement. As expected, adolescents' perceptions of parental work behavior affected their plans for own work involvement. Same-sex parents served as main role models for the adolescents' own…

  8. How Medicare Prescription Drug Coverage Works with a Medicare Advantage Plan or Medicare Cost Plan

    Science.gov (United States)

    ... plans . Medicare drug plans are run by insurance companies and other private companies approved by Medicare. Each plan can vary in ... Plan (PDP). • Medicare HMO Plans —You must use network providers for ... or call Social Security at 1-800-772-1213. TTY users ...

  9. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, H.T.

    1998-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP). This MAPAR provides a status on specific DARHT facility design- and construction-related mitigation actions that have been initiated in order to fulfill DOE`s commitments under the DARHT MAP. The functions of the DARHT MAP are to (1) document potentially adverse environmental impacts of the Phased Containment Option delineated in the Final EIS, (2) identify commitments made in the Final EIS and ROD to mitigate those potential impacts, and (3) establish Action Plans to carry out each commitment (DOE 1996). The DARHT MAP is divided into eight sections. Sections 1--5 provide background information regarding the NEPA review of the DARHT project and an introduction to the associated MAP. Section 6 references the Mitigation Action Summary Table which summaries the potential impacts and mitigation measures; indicates whether the mitigation is design-, construction-, or operational-related; the organization responsible for the mitigation measure; and the projected or actual completion data for each mitigation measure. Sections 7 and 8 discuss the Mitigation Action Plan Annual Report and Tracking System commitment and the Potential Impacts, Commitments, and Action Plans respectively. Under Section 8, potential impacts are categorized into five areas of concern: General Environment, including impacts to air and water; Soils, especially impacts affecting soil loss and contamination; Biotic Resources, especially impacts affecting threatened and endangered species; Cultural/Paleontological Resources, especially impacts affecting the archeological site known as Nake`muu; and Human Health and Safety, especially impacts pertaining to noise and radiation. Each potential impact includes a brief statement of the nature of the impact and its cause(s). The commitment

  10. Final work plan for targeted investigation at Inman, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-11-05

    In 1997, low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5 {micro}g/L) were detected in groundwater at Inman, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1997 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Inman from 1954 to 1965. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Inman is located in southwest McPherson County, approximately 10 mi southwest of the city of McPherson (Figure 1.1). To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation at Inman, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA. For this work plan, Argonne compiled historical data related to the previous investigations and grain storage operations at Inman. Through a review of documents acquired from all available sources, other potential contaminant source areas (in addition to the former CCC/USDA facility) have been identified as (1) the commercial grain storage structures northwest of Inman, along the railroad right-of-way, and (2) small former private grain storage facilities west of Main Street and near the former CCC/USDA facility at the southern edge of Inman (Figure 1.2). Previous investigations and the potential source areas are discussed in Section 2.

  11. 324 Building life cycle dose estimates for planned work

    Energy Technology Data Exchange (ETDEWEB)

    Landsman, S.D.; Peterson, C.A.; Thornhill, R.E.

    1995-09-01

    This report describes a tool for use by organizational management teams to plan, manage, and oversee personnel exposures within their organizations. The report encompasses personnel radiation exposures received from activities associated with the B-Cell Cleanout Project, Surveillance and Maintenance Project, the Mk-42 Project, and other minor activities. It is designed to provide verifiable Radiological Performance Reports. The primary area workers receive radiation exposure is the Radiochemical Engineering Complex airlock. Entry to the airlock is necessary for maintenance of cranes and other equipment, and to set up the rail system used to move large pieces of equipment and shipping casks into and out of the airlock. Transfers of equipment and materials from the hot cells in the complex to the airlock are required to allow dose profiles of waste containers, shuffling of waste containers to allow grouting activities to go on, and to allow maintenance of in-cell cranes. Both DOE and the Pacific Northwest Laboratory (PNL) are currently investing in state-of-the-art decontamination equipment. Challenging goals for exposure reduction were established for several broad areas of activity. Exposure estimates and goals developed from these scheduled activities will be compared against actual exposures for scheduled and unscheduled activities that contributed to exposures received by personnel throughout the year. Included in this report are life cycle exposure estimates by calendar year for the B-Cell Cleanout project, a three-year estimate of exposures associated with Surveillance and Maintenance, and known activities for Calendar Year (CY) 1995 associated with several smaller projects. These reports are intended to provide a foundation for future dose estimates, by year, requiring updating as exposure conditions change or new avenues of approach to performing work are developed.

  12. Planning the annual cycle in groups of cadet combat sports perfection

    Directory of Open Access Journals (Sweden)

    Ananchenko Konstantin

    2016-08-01

    Full Text Available Within a large training cycle in conditions of high general level of stress the authors recommend optimal implementation of planning undulating dynamics of cadets’ combat exercise stress. The article proves the efficiency of one-cycle construction of training highly- qualified single-combat cadets at the stage of maximal realization of sporting possibilities, which includes both features of traditional cycles (preparatory, competitional, transitional and module-sectional composition of training. It scientifically substantiates, that the choice of those or other types of microcycles which present the structure of mesocycles is determined by a few basic factors which must be necessarily taken into account while planning the training process of sportsmen of different qualification. It is suggested to use certain varieties of microcycles in the practice of preparation of single combat cadets. It is substantiated that accounting in planning the annual cycle in groups of sporting perfection of students of the educed types of microcycles for every type of single combats is an actual task of further scientific research.

  13. 40 CFR 35.4140 - What must be included in my group's work plan?

    Science.gov (United States)

    2010-07-01

    ... Tag § 35.4140 What must be included in my group's work plan? (a) Your scope of work must clearly... 40 Protection of Environment 1 2010-07-01 2010-07-01 false What must be included in my group's work plan? 35.4140 Section 35.4140 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS...

  14. Florida Gulf Coast University Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  15. University of North Florida Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  16. Florida Gulf Coast University Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  17. University of North Florida Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  18. Florida Atlantic University Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  19. University of West Florida Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  20. New College of Florida Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  1. University of Central Florida Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  2. Florida Polytechnic University Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  3. Florida Atlantic University Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  4. Florida Atlantic University Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  5. University of North Florida Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  6. University of Florida Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  7. New College of Florida Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  8. University of South Florida Tampa Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  9. Florida A&M University Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  10. Florida A&M University Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  11. University of Central Florida Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  12. Florida Polytechnic University Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  13. Florida State University Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  14. University of West Florida Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  15. Florida International University Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  16. Florida State University Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  17. Florida International University Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  18. Florida Gulf Coast University Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  19. University of Central Florida Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  20. University of South Florida System Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  1. University of Florida Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  2. New College of Florida Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  3. Florida International University Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  4. Florida State University Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  5. USF Sarasota-Manatee Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  6. University of Florida Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  7. On the socioeconomic benefits of family planning work.

    Science.gov (United States)

    Yang, D

    1991-01-01

    The focus of this article is on 1) the intended socioeconomic benefit of Chinese family planning (FP) versus the benefit of the maternal production sector, 2) the estimated costs of FP work, 3) and the principal ways to lower FP costs. Marxian population theory, which is ascribed to in socialist China, states that population and socioeconomic development are interconnected and must adapt to each other and that an excessively large or small population will upset the balance and retard development. Malthusians believe that large populations reduce income, and Adam Smith believed that more people meant a larger market and more income. It is believed that FP will bring socioeconomic benefits to China. The socioeconomic benefit of material production is the linkage between labor consumption and the amount of labor usage with the fruits and benefits of labor. FP invests in human, material, and financial resources to reduce the birth rate and the absolute number of births. The investment is recouped in population. The increased national income generated from a small outlay to produce an ideal population would be used to improve material and cultural lives. FP brings economic benefits and accelerates social development (ecological balances women's emancipation and improvement in the physical and mental health of women and children, improvement in cultural learning and employment, cultivation of socialist morality and new practices, and stability). In computing FP cost, consideration is given to total cost and unit cost. Cost is dependent on the state budget allocation, which was 445.76 million yuan in 1982 and was doubled by 1989. World Bank figures for 1984 affixed the FP budget in China at 979.6 million US dollars, of which 80% was provided by China. Per person, this means 21 cents for central, provincial, prefecture, and country spending, 34 cents for rural collective set-ups, 25 cents for child awards, and various subsidies, 15 cents for sterilization, and 5 cents for

  8. Site Characterization Work Plan for Gasbuggy, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2000-12-14

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation

  9. Proceedings of the 23rd Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    Sydnor, Richard L. (Editor)

    1992-01-01

    A compilation of technical papers, from the 23rd annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting, is presented. Papers were given in the following categories: (1) developments in rubidium, cesium, and hydrogen-based frequency standards, and in cryogenic and trapped-ion technology; (2) international and transnational applications of PTTI technology with emphasis on satellite laser tracking networks, GLONASS timing, comparison of national time scales and international communications; (3) applications of PTTI technology to the telecommunications, power distribution, platform positioning, and geophysical survey industries; (4) applications of PTTI technology to evolving military communications and navigation systems; and (5) dissemination of precise time and frequency by means of GPS, GLONASS, MILSTAR, Loran, and synchronous communications satellites.

  10. The 26th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    Sydnor, Richard (Editor)

    1995-01-01

    This document is a compilation of technical papers presented at the 26th Annual PTTI Applications and Planning Meeting. Papers are in the following categories: (1) Recent developments in rubidium, cesium, and hydrogen-based frequency standards, and in cryogenic and trapped-ion technology; (2) International and transnational applications of Precise Time and Time Interval technology with emphasis on satellite laser tracking, GLONASS timing, intercomparison of national time scales and international telecommunications; (3) Applications of Precise Time and Time Interval technology to the telecommunications, power distribution, platform positioning, and geophysical survey industries; (4) Applications of PTTI technology to evolving military communications and navigation systems; and (5) Dissemination of precise time and frequency by means of GPS, GLONASS, MILSTAR, LORAN, and synchronous communications satellites.

  11. 27th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    Sydnor, Richard L. (Editor)

    1996-01-01

    This document is a compilation of technical papers presented at the 27th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting, held November 29 - December 1, 1995 at San Diego, CA. Papers are in the following categories: Recent developments in rubidium, cesium, and hydrogen-based frequency standards; and in cryogenic and trapped-ion technology; International and transnational applications of PTTI technology with emphasis on satellite laser tracking, GLONASS timing, intercomparison of national time scales and international telecommunications; Applications of PTTI technology to the telecommunications, power distribution, platform positioning, and geophysical survey industries; Applications of PTTI technology to evolving military communications and navigation systems; and Dissemination of precise time and frequency by means of Global Positioning System (GPS), Global Satellite Navigation System (GLONASS), MILSTAR, LORAN, and synchronous communications satellites.

  12. Regulatory Technology Development Plan - Sodium Fast Reactor. Mechanistic Source Term - Trial Calculation. Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    Grabaskas, David [Argonne National Lab. (ANL), Argonne, IL (United States); Bucknor, Matthew [Argonne National Lab. (ANL), Argonne, IL (United States); Jerden, James [Argonne National Lab. (ANL), Argonne, IL (United States); Brunett, Acacia J. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-02-01

    The overall objective of the SFR Regulatory Technology Development Plan (RTDP) effort is to identify and address potential impediments to the SFR regulatory licensing process. In FY14, an analysis by Argonne identified the development of an SFR-specific MST methodology as an existing licensing gap with high regulatory importance and a potentially long lead-time to closure. This work was followed by an initial examination of the current state-of-knowledge regarding SFR source term development (ANLART-3), which reported several potential gaps. Among these were the potential inadequacies of current computational tools to properly model and assess the transport and retention of radionuclides during a metal fuel pool-type SFR core damage incident. The objective of the current work is to determine the adequacy of existing computational tools, and the associated knowledge database, for the calculation of an SFR MST. To accomplish this task, a trial MST calculation will be performed using available computational tools to establish their limitations with regard to relevant radionuclide release/retention/transport phenomena. The application of existing modeling tools will provide a definitive test to assess their suitability for an SFR MST calculation, while also identifying potential gaps in the current knowledge base and providing insight into open issues regarding regulatory criteria/requirements. The findings of this analysis will assist in determining future research and development needs.

  13. Semi-Annual Report on Work Supporting the International Forum for Reactor Aging Management (IFRAM)

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Leonard J.; Brenchley, David L.

    2011-11-30

    During the first six months of this project, Pacific Northwest National Laboratory has provided planning and leadership support for the establishment of the International Forum for Reactor Aging Management (IFRAM). This entailed facilitating the efforts of the Global Steering Committee to prepare the charter, operating guidelines, and other documents for IFRAM. It also included making plans for the Inaugural meeting and facilitating its success. This meeting was held on August 4 5, 2011, in Colorado Springs, Colorado. Representatives from Asia, Europe, and the United States met to share information on reactor aging management and to make plans for the future. Professor Tetsuo Shoji was elected chairperson of the Leadership Council. This kick-off event transformed the dream of an international forum into a reality. On August 4-5, 2011, IFRAM began to achieve its mission. The work completed successfully during this period was built upon important previous efforts. This included the development of a proposal for establishing IFRAM and engaging experts in Asia and Europe. The proposal was presented at Engagement workshops in Seoul, Korea (October 2009) and Petten, The Netherlands (May 2010). Participants in both groups demonstrated strong interest in the establishment of IFRAM. Therefore, the Global Steering Committee was formed to plan and carry out the start-up of IFRAM in 2011. This report builds on the initial activities and documents the results of activities over the last six months.

  14. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  15. Planning for the Future: An Investigation of Work-Bound Rural Youth

    Science.gov (United States)

    Hutchins, Bryan C.; Meece, Judith L.; Byun, Soo-yong; Farmer, Thomas W.

    2012-01-01

    The purpose of this study was to explore the postsecondary educational and occupational expectations of work-bound rural youth. Three groups of work-bound youth were identified (work-bound, work-bound with future educational plans, and work-bound but unsure/undecided about postsecondary education), and each group was compared to college-bound…

  16. 77 FR 29317 - Fiscal Year 2012 Draft Work Plan

    Science.gov (United States)

    2012-05-17

    ... Appropriation funding. Sustainability Policy All energy construction grants will proceed after business plans... sustainable economy, and to build and ensure the operation and maintenance of Alaska's basic infrastructure... following general principles: In FY 2012 no project specific earmarks were directed. The Energy and...

  17. Do Early Outs Work Out? Teacher Early Retirement Incentive Plans.

    Science.gov (United States)

    Brown, Herb R.; Repa, J. Theodore

    1993-01-01

    School districts offer teacher early retirement incentive plans (TERIPs) as an opportunity to hire less expensive teachers, reduce fringe benefits costs, and eliminate teaching positions. Discusses reasons for teachers to accept TERIP, and describes a computer model that allows school officials to calculate and compare costs incurred if an…

  18. ESU Plan of Work 2011: More Money for Our Education

    Science.gov (United States)

    European Students' Union (NJ1), 2011

    2011-01-01

    Following signals across Europe the European Students' Union (ESU) will focus its next working year on defending education as a public good, and a public responsibility. Since the very start of the new ESU team in July 2010 the ESU elected representatives have been working to develop a new political vision for the next ESU working year, that both…

  19. 78 FR 33395 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013-William D. Ford...

    Science.gov (United States)

    2013-06-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013--William D. Ford Federal...- 800-877-8339. SUPPLEMENTARY INFORMATION: Under the William D. Ford Federal Direct Loan (Direct...

  20. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  1. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  2. Strengthening the European region of IUHPE -- Work Plan of IUHPE/EURO for 2008--10.

    Science.gov (United States)

    Pyykkö, Mika; Koskenkorva, Satu

    2008-09-01

    The commentary presents the Work Plan of the IUHPE European Region for 2008-10. The plan has been put together after a comprehensive discussion and review of the results of a survey of IUPHE European Region members. The result is a plan that provides overarching and future-oriented support for the development of the activities in the region. The main strategies of the new IUHPE/EURO Work Plan include: 1. effective working of the Regional Committee; 2. supporting and engaging IUHPE members; 3. advocacy and partnership building; 4. strengthening communications; and 5. follow-up and evaluation.

  3. Work-Plan Heroes: Student Strategies in Lower-Secondary Norwegian Classrooms

    Science.gov (United States)

    Dalland, Cecilie P.; Klette, Kirsti

    2014-01-01

    This article explores how individualized teaching methods, such as the use of work plans, create new student strategies in Norwegian lower secondary classrooms. Work plans, which are frequently set up as instructional tools in Norwegian classrooms, outline different types of tasks and requirements that the students are supposed to do during a…

  4. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

  5. Simple Analysis of the university counsellors’ daily work and planning

    Institute of Scientific and Technical Information of China (English)

    Chen Juan

    2014-01-01

    Summary:Counsellor act as the backbone effect in students’ ideological and political work, who specialized in students’Ideological education and behavior management, and they are important component in teaching staff.

  6. Emergency preparedness exercises and information. Annual report 1996. Project plans 1997; Beredskapsoevelser og informasjonsutveksling. Aarsrapport 1996. Plan 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    EKO-4, Emergency preparedness exercises and information exchange, consists of two sub projects. In EKO-4.1, Exercises and scenario development, a functional exercise on dose calculation has been arranged and followed up by a seminar. In addition, a seminar for intercomparison of Nordic dispersion models has been arranged bases on results from the international full scale experiment ETEX-1. Both arrangements showed to be useful for the nuclear emergency preparedness in the Nordic countries and contributed to better knowledge about the different models. Such arrangements also strengthen the personal networks. In EKO-4.1, a survey on available tools for scenario development for national and regional exercises in the Nordic country is going on. The needs from the exercise planners point of view will be focused before further development is suggested. In EKO-4.2, Nordic system for exchange of data and information, the working group has evaluated different technical solutions. The results have been presented in a report. The work with implementing the system has been delayed but it will continue next year in close co-operation with the Nordic authorities working group on emergency preparedness (NEP). A new version of the nuclear emergency preparedness handbook has been published. There is a need for further revisions and these are planned for 1997. With the new revision, the handbook will be made available on WWW. (EG).

  7. Work plan for the Sangamon River basin, Illinois

    Science.gov (United States)

    Stamer, J.K.; Mades, Dean M.

    1983-01-01

    The U.S. Geological Survey, in cooperation with the Division of Water Resources of the Illinois Department of Transportation and other State agencies, recognizes the need for basin-type assessments in Illinois. This report describes a plan of study for a water-resource assessment of the Sangamon River basin in central Illinois. The purpose of the study would be to provide information to basin planners and regulators on the quantity, quality, and use of water to guide management decisions regarding basin development. Water quality and quantity problems in the Sangamon River basin are associated primarily with agricultural and urban activities, which have contributed high concentrations of suspended sediment, nitrogen, phosphorus, and organic matter to the streams. The impact has resulted in eutrophic lakes, diminished capacity of lakes to store water, low concentrations of dissolved oxygen, and turbid stream and lake waters. The four elements of the plan of study include: (1) determining suspended sediment and nutrient transport, (2) determining the distribution of selected inorganic and organic residues in streambed sediments, (3) determining the waste-load assimilative capacity of the Sangamon River, and (4) applying a hydraulic model to high streamflows. (USGS)

  8. APA guidelines: their importance and a plan to keep them current: 2013 annual report of the Policy and Planning Board.

    Science.gov (United States)

    2014-01-01

    When guidelines are approved by APA, they become association policy, and it is imperative that they remain current. The revision of guidelines poses several challenges to the association. These challenges range from the availability and allocation of resources to support the complicated processes involved in developing and updating these policies to the lack of a clearly defined process that includes identification of tasks, assignments of responsibilities, and so forth. For this reason, the APA Board of Directors asked the Policy and Planning Board (P&P) to work with the boards of the four directorates (i.e., the Education Directorate, the Practice Directorate, the Public Interest Directorate, and the Science Directorate) to create a proposal that would (a) make recommendations with regard to how the review and revision of guidelines documents might best be accomplished in accordance with the APA Strategic Plan and existing policies and procedures and (b) make suggestions regarding the association resources that might be required. The Board of Directors approved the proposed review process in December 2013.

  9. Final Work Plan: Phase I investigation at Eustis, Nebraska

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, Lorraine M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2013-05-01

    The village of Eustis is located in the northeast corner of Frontier County, Nebraska (Figure 1.1), near Interstate 80 and approximately 190 mi west of Lincoln. From 1950 to 1964, the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility at the southeastern edge of Eustis. During this time, commercial grain fumigants containing carbon tetrachloride were in common use to preserve grain in storage. In July 2011, the Nebraska Department of Health and Human Services (NDHHS) calculated a running annual average concentration of carbon tetrachloride in groundwater from one of the Eustis public water supply wells (PWS 70-1) at 5.24 μg/L, exceeding the maximum contaminant level (MCL) of 5.0 μg/L. The running average value was calculated on the basis of results (4.01-6.87 μg/L) from four groundwater sampling events in 2011 for well PWS 70-1 (NDHHS 2011). On January 16, 2012, the village placed well PWS 70-1 on backup/standby status for emergency use only (Village of Eustis 2012). This results of this groundwater sampling are presented here.

  10. Environmental Release Prevention and Control Plan (ERP and CP) annual review and update for 1993

    Energy Technology Data Exchange (ETDEWEB)

    Jannik, G.T. [comp.; Mamatey, A.; Arnett, M.

    1993-10-05

    In the Environmental Release Prevention and Control Plan (ERP and CP), WSRC made a commitment to conduct the following follow-up activities and actions: (1) Complete the action items developed in response to the findings and recommendation of the Environmental Release Prevention Taskteam (WSRC-RP-92-356). (2) Complete all batch and continuous release procedure revisions to incorporate the attributes that WSRC senior management required of each procedure. (3) DOE-SR Assistance Managers and WSRC counterparts to reach consensus and closure on the identified engineered solutions documented in the ERP and CP, develop and drive implementation of facility changes per the agreements. (4) Continue to analyze releases and monitor performance in accordance with the ERP and CP, and utilize the ALARA Release Guides Committee to drive improvements. (5) Conduct annual re-evaluations of the cost benefit analyses of the identified engineered solutions, and identify new options and alternatives for each outfall in response to site mission and facility changes. This report documents the efforts that have been completed over the past year in response to these commitments.

  11. Predicting College Women's Career Plans: Instrumentality, Work, and Family

    Science.gov (United States)

    Savela, Alexandra E.; O'Brien, Karen M.

    2016-01-01

    This study examined how college women's instrumentality and expectations about combining work and family predicted early career development variables. Specifically, 177 undergraduate women completed measures of instrumentality (i.e., traits such as ambition, assertiveness, and risk taking), willingness to compromise career for family, anticipated…

  12. [To develop the family planning work deeply through following the working method of "taking three as the keys"].

    Science.gov (United States)

    1982-11-29

    In recent years family planning work in China's Rongcheng County has been accomplished through "sudden attacks" on the problem, and although these concentrated work efforts have been successful, nevertheless there have been deleterious effects, e.g., a drain on the leadership such that work is affected, overburdened hospital workloads that lead to surgical mistakes, and pressure on the people's spirits. In order to ameliorate the situation, longterm planning was proposed in 1981 "to take three as the keys," i.e., to take propaganda education as the key in its relationship to economic measures, to take birth control as the key in its relationship to abortion, and to take longterm work as the key in its relationship to shortterm work. In 1981 Roncheng County increased its propaganda education efforts by making family planning the subject of numerous meetings, radio broadcasts, recordings, posters, and drama. It also emphasized positive education (i.e., teaching the good qualities of life conduct) and commended good people and good deeds. Family planning work also strengthened political education, making people aware of the policy of 1 child per family. Due to a sudden rise in unplanned 2nd pregnancies in Roncheng County, the number of abortions was high, so scientific knowledge of contraceptive use was widely disseminated to all fertile women. In order to make family planning function on a continous basis, one must grasp surely and carefully the primary work of organizations at all levels and be systematic in follow-ups. The results of "taking three as the keys" include: for the first 6 months of 1982 the single child rate was 95.63%; contraceptive use was more effective, causing the abortion rate to drop 10.3% from a comparable period in 1981; and 99.52% of 1-child-couples applied for Single Child Certificates.

  13. When Planning Results in Loss of Control: Intention-Based Reflexivity and Working-Memory

    Directory of Open Access Journals (Sweden)

    Nachshon eMeiran

    2012-05-01

    Full Text Available In this review, the authors discuss the seemingly paradoxical loss of control associated with states of high readiness to execute a plan, termed intention-based reflexivity. The review suggests that the neuro-cognitive systems involved in the preparation of novel plans are different than those involved in preparation of practiced plans (i.e., those that have been executed beforehand. When the plans are practiced, intention based reflexivity depends on the prior availability of response codes in long-term memory. When the plans are novel, reflexivity is observed when the plan is pending and the goal has not yet been achieved. Intention-based reflexivity also depends on the availability of working memory limited resources and the motivation to prepare. Reflexivity is probably related to the fact that, unlike reactive control (once a plan is prepared, proactive control tends to be relatively rigid.

  14. When planning results in loss of control: intention-based reflexivity and working-memory

    Science.gov (United States)

    Meiran, Nachshon; Cole, Michael W.; Braver, Todd S.

    2012-01-01

    In this review, the authors discuss the seemingly paradoxical loss of control associated with states of high readiness to execute a plan, termed “intention-based reflexivity.” The review suggests that the neuro-cognitive systems involved in the preparation of novel plans are different than those involved in preparation of practiced plans (i.e., those that have been executed beforehand). When the plans are practiced, intention-based reflexivity depends on the prior availability of response codes in long-term memory (LTM). When the plans are novel, reflexivity is observed when the plan is pending and the goal has not yet been achieved. Intention-based reflexivity also depends on the availability of working-memory (WM) limited resources and the motivation to prepare. Reflexivity is probably related to the fact that, unlike reactive control (once a plan is prepared), proactive control tends to be relatively rigid. PMID:22586382

  15. Single-shell tank closure work plan. Revision A

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  16. CAS Leaders Convene to Review Previous Work and Plan Future

    Institute of Scientific and Technical Information of China (English)

    2004-01-01

    @@ The 2004 enlarged summer session of the Leading Group of the Communist Party of China (CPC) at CAS was held July 26-31. It came amid a nationwide campaign to study the important thought of the Three Represents and the scientific approach to development advanced by the CPC Central Committee. The meeting coincided with a crucial moment for the development of CAS, as the Academy is about to kick off the third phase of work for the trial implementation of its Knowledge Innovation Program (KIP). A wide range of issues were discussed at this highly efficient and pragmatic meeting, which is expected to significantly influence the development of CAS.

  17. Functional Behavioral Assessments and Behavior Support Plans for Work-Based Learning

    Science.gov (United States)

    Kittelman, Angus; Wagner Bromley, Katherine; Mazzotti, Valerie L.

    2016-01-01

    Work experiences are linked to positive post-school outcomes for youth and young adults with disabilities. Unfortunately, students who struggle to manage conflict and challenges in work settings have a difficult time maintaining employment. Though ecological assessments are used to create supported work plans surrounding socially inappropriate…

  18. 75 FR 7256 - Denali Commission Fiscal Year 2010 Draft Work Plan

    Science.gov (United States)

    2010-02-18

    ... design team has included a professional architect/engineering firm and representatives from a diversity... independent Federal agency based on an innovative Federal-State partnership designed to provide critical... outlined in the FY 2010 Work Plan. Conceptual Planning/Design for Bulk 949,370. Fuel and RPSU. Sub-total...

  19. Parental influence on work and family plans of adolescents of different ethnic backgrounds in the Netherlands

    NARCIS (Netherlands)

    de Valk, H.A.G.

    2008-01-01

    This paper examined the work and family plans of adolescents from five different ethnic origins. The way in which parents influence these plans was studied by using a representative sample of secondary school pupils (N = 52,000) in The Netherlands. Results showed that substantial proportions of adol

  20. 77 FR 43237 - Genome in a Bottle Consortium-Work Plan Review Workshop

    Science.gov (United States)

    2012-07-24

    ... National Institute of Standards and Technology Genome in a Bottle Consortium--Work Plan Review Workshop.... SUMMARY: NIST announces the Genome in a Bottle Consortium meeting to be held on Thursday and Friday, August 16 and 17, 2012. The Genome in a Bottle Consortium is planning to develop the reference...

  1. Refining the Commission's Work Plan on Student Success: A Progress Report. Report 10-23

    Science.gov (United States)

    Wilson, Stacy; Fuller, Ryan; Trott, Marcia

    2010-01-01

    Among its planning and coordinating responsibilities, the California Postsecondary Education Commission is required by state law to assess the ongoing effectiveness of postsecondary education in meeting societal, educational, and workforce needs. At its September 28-29 meeting, the Commission supported staff's proposed work plan to transition from…

  2. Jiangxi Copper Group Plans to Start up Opencast Mining Improvement Work

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    <正>Jiangxi Copper Group recently expresses that it prepares to start up opencast mining improvement work in Dexing Fujiawu Mine Area. When it achieves the production, its production scale will achieve 15,000 tons of daily mining, and annually produce on average copper concentrate, which includes 22,265 tons of copper,

  3. FY2004 Progress Summary and FY2005 Program Plan Statement of Work and Deliverables

    Energy Technology Data Exchange (ETDEWEB)

    Meier, W; Bibeau, C

    2006-01-23

    FY2004 progress summary and FY2005 program plan statement of work and deliverables for development of high average power diode-pumped solid state lasers, and complementary technologies for applications in energy and defense.

  4. Evaluation of black-billed magpies as monitors of environmental contamination : Work plan 1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Preliminary proposal and work plan for the project "Evaluation of Black-billed Magpies as Indicators of Environmental Contamination at the Rocky Mountain Arsenal"....

  5. Big Lake National Wildlife Refuge : Annual Water Management Plan : Calendar Year 1991

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Big Lake National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  6. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-14

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

  7. Site Characterization Work Plan for Gnome-Coach Site, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-02-13

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective

  8. Didactical-methodical aspects of planning the educative work at the Macedonian educational system

    OpenAIRE

    Mirascieva, Snezana

    2010-01-01

    This paper is about one new didactical- methodical approach in the planning of the educational work at the educational institutions in Macedonia which is in function of the professional development of the teaching staff. The paper presents a new practice which is introduced at the educational system in Republic of Macedonia, and which refers on two key questions like integrated planning of the educational work and ecology education at the educational institutions on three levels: pre-school, ...

  9. Commentary: improving the quality and effectiveness of IUHPE communications: work plan 2007--2010.

    Science.gov (United States)

    Perry, Martha W; Mittelmark, Maurice B

    2008-06-01

    The article presents the work plan of the IUHPE Communications portfolio during the present term of the Vice-President for communications in the IUHPE Board of Trustees (2007-10). The plan has been put together after a comprehensive review of the existing IUHPE communications areas. The result is a plan that aims to provide overarching support for the development of the organisation. In the plan, existing IUHPE communication tools are strengthened to respond better to today's communications' aims and objectives; while new tools are designed to make an impact through all communications' channels. The quality and effectiveness of these tools will contribute to shape a sustainable communications strategy and priorities.

  10. Guide for Accredited Private School Education Planning and Results Reporting. Requirements for Three-Year Education Plans for 2007/08-2009/10 and Annual Education Results Reports for November 2007

    Science.gov (United States)

    Online Submission, 2007

    2007-01-01

    The Guide to Accredited Private School Education Planning and Results Reporting, 2007-2010 provides the provincial requirements for: 1) Private school authority three-year education plans for 2007-2010. These plans cover the 2007/08, 2008/09 and 2009/10 school years. 2) Private school authority annual education results report for the 2006/07…

  11. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    Energy Technology Data Exchange (ETDEWEB)

    Wells, J.L.

    1997-03-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  12. The work plan for the newly created IUHPE Vice President for Strategy and Governance.

    Science.gov (United States)

    Sparks, Michael

    2008-12-01

    The position of Vice President for Strategy and Governance was created at the first full meeting of the International Union for Health Promotion and Education Board of Trustees in June 2007 in Vancouver, Canada. Specific duties were developed for the position and the newly elected Vice President developed a work plan for the period of 2007-10. This paper describes the responsibilities of the newly created Vice Presidency and the work plan developed to meet those responsibilities. The key action areas for the focus of the work of the Vice President for Strategy and Governance include: finalising the rewritten Strategic Directions for 2008-10; developing Strategic Directions for 2010-16; developing and implementing processes to improve the strategic coordination and reporting of work plans across the organisation; and broad responsibility for eliciting and working with the organisation to respond to governance issues.

  13. Learners’ processes during pre-task planning and Working Memory Capacity

    Directory of Open Access Journals (Sweden)

    Maria da Gloria Tavares

    2016-01-01

    Full Text Available http://dx.doi.org/10.5007/2175-8026.2016v69n1p79 The present study is part of a larger scale research (Guará-Tavares, 2011, 2013 that investigates the relationship among working memory capacity, pre-task planning, and L2 speech performance. The aim of the study was to analyze 1 what processes learners engage during pre-task planning, and 2 whether higher and lower working memory spans engage in different processes during pre-task planning. Learners’ processes were accessed by means of think aloud protocols and a retrospective interview. Working memory capacity was measured by the Speaking Span Test. Results show that learners engage mainly in organization of ideas, rehearsal, lexical searches, and monitoring.. Moreover, higher spans employ significantly more metacognitive strategies during planning when compared to lower spans.

  14. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  15. Understanding work-related social media use: An extension of theory of planned behavior.

    NARCIS (Netherlands)

    van Zoonen, W.; Verhoeven, J.W.M.; Elving, W.J.L.

    2014-01-01

    This study examines the motives of employees to engage in work related social media use - i.e. the use of personal social media accounts to communicate about work-related issues. The theory of planned behavior (TPB) was used to explain this behavior. Because social media can enable users to express

  16. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    Pentecost, E.D.; Vinikour, W.S. [Argonne National Lab., IL (United States)

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods.

  17. Tewaukon National Wildlife Refuge Complex: 1991 Annual Water Management Plan and 1990 Use Report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is the water use report/management plan for Tewaukon National Wildlife Refuge Complex for 1991-1990. The plan includes discussion on water rights,...

  18. Tewaukon National Wildlife Refuge Complex: 1995 Annual Water Management Plan and 1994 Use Report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is the water use report/management plan for Tewaukon National Wildlife Refuge Complex for 1995-1994. The plan includes discussion on water rights,...

  19. Bioconversion of plant biomass to ethanol. Annual report and revised research plan, January 1977--January 1978

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, R.E.; Bellamy, W.D.; Su, T.M.

    1978-03-23

    The objective of this research is to demonstrate on a laboratory scale the technical feasibility of the direct microbial conversion of pretreated wood to ethanol. During the first year of this contract, we investigated the feasibility of biologically delignifying wood with C. pruinosum and directly fermenting the pretreated wood to ethanol with a mixed culture. Bench-top fermentations of a thermophilic bacillus growing on glucose and of a mixed culture of thermophilic sporocytophaga (US) and a thermophilic bacillus growing on microcrystalline and amorphous cellulose were evaluated for growth and ethanol production. In the mixed culture fermentation of amorphous and microcrystalline cellulose, the specific rate of substrate depletion was calculated to be 0.087 hr/sup -1/ and 0.0346 hr/sup -1/, respectively. However, defining the growth requirements of C. pruinosum and sporocytophaga (US) proved more difficult than originally anticipated. In order to achieve the program objectives within the contract period, a revised research plan was developed based upon chemical pretreatment and the direct fermentation of pretreated hardwood to ethanol. In place of the biological delignification pretreatment step, we have substituted a chemically supplemented steam pretreatment step to partially delignify wood and to enhance its accessibility to microbial utilization. Clostridium thermocellum, which ferments cellulose directly to ethanol and acetic acid, has replaced the mixed culture fermentation stage for ethanol production. Research on the production of ethanol from xylose by the thermophilic bacillus ZB-B2 is retained as one means of utilizing the hemicellulose fraction of hardwood. Work on the genetic improvement of the ethanol yields of both cultures by suppressing acetic acid production is also retained. The rationale, experimental approach, and economic considerations of this revised research plan are also presented.

  20. Advanced reactors transition FY 1997 multi-year work plan WBS 7.3

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1996-09-27

    This document describes in detail the work to be accomplised in FY 1997 and the out-years for the Advanced Reactors Transition (WBS 7.3) under the management of the Babcock & Wilcox Hanford Company. This document also includes specific milestones and funding profiles. Based upon the Fiscal Year 1997 Multi-Year Work Plan, the Department of Energy will provide authorization to perform the work described.

  1. U.S. Department of Energy Office of Inspector General fiscal year 1999 annual performance plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    This plan is published pursuant to requirements of the Government Performance and Results Act of 1993. The plan outlines the goals, objectives, and strategies that the Office of Inspector General intends to implement and execute in FY 1999. The plan also includes the details of this office`s efforts to continually improve customer service.

  2. Annual report of the Summit Members' Working Group on Controlled Thermonuclear Fusion (Fusin Working Group (FWG))

    Energy Technology Data Exchange (ETDEWEB)

    none,

    1987-04-01

    The Summit Members' Working Group on Controlled Thermonuclear Fusion (Fusion Working Group (FWG)) was established in 1983 in response to the Declaration of the Heads of State and Government at the Versailles Economic Summit meeting of 1982, and in response to the subsequent report of the Working Group in Technology, Growth and Employment (TGE) as endorsed at the Williamsburg Summit meeting, 1983. This document contains the complete written record of each of the three FWG meetings which include the minutes, lists of attendees, agendas, statements, and summary conclusions as well as the full reports of the Technical Working Party. In addition, there is a pertinent exchange of correspondence between FWG members on the role of the Technical Working Party and a requested background paper on the modalities associated with a possible future ETR project.

  3. The interplay between women's life course work patterns and financial planning for later life.

    Science.gov (United States)

    Berger, Ellie D; Denton, Margaret A

    2004-01-01

    In order to gain a comprehensive understanding of the interplay between women's life course work patterns and their financial planning for later life, we examined data from semi-structured interviews with retired women (n = 28) aged 59 to 92. The majority of women disrupted their careers at some point in time, for an average of 14 years, primarily for child-rearing responsibilities. We found that financial preparedness and income security in later life are structured by women's life course work patterns. However, individuals also have the ability to shape their own lives and many of the women took the initiative to acquire financial knowledge irrespective of their work situation. Financial-planning advice that participants gave to future generations of older women was also explored and centred on the importance of saving, avoiding debt, maintaining financial independence, and planning ahead.

  4. Corrective measures evaluation work plan : Technical Area V Groundwater : revision 0.

    Energy Technology Data Exchange (ETDEWEB)

    Lebow, Patrick S.; Dettmers, Dana L.; Hall, Kevin A.

    2004-12-01

    This document, which is prepared as directed by the Compliance Order on Consent (COOC) issued by the New Mexico Environment Department, identifies and outlines a process to evaluate remedial alternatives to identify a corrective measure for the Sandia National Laboratories/New Mexico Technical Area (TA)-V Groundwater. The COOC provides guidance for implementation of a Corrective Measures Evaluation (CME) for the TA-V Groundwater. This Work Plan documents an initial screening of remedial technologies and presents a list of possible remedial alternatives for those technologies that passed the screening. This Work Plan outlines the methods for evaluating these remedial alternatives and describes possible site-specific evaluation activities necessary to estimate remedy effectiveness and cost. These methods will be reported in the CME Report. This Work Plan outlines the CME Report, including key components and a description of the corrective measures process.

  5. Spatial working memory and planning ability: contrasts between schizophrenia and bipolar I disorder.

    Science.gov (United States)

    Badcock, Johanna C; Michiel, Patricia T; Rock, Danny

    2005-12-01

    Working memory may be conceptualized as a multi-component system involving the active maintenance and manipulation of stored information in the service of planning/guiding behaviour. Impaired spatial working memory is a robust finding in schizophrenia patients which has been related to an impairment in frontostriatal connectivity. The purpose of this study was to examine the specificity of this impairment by comparing the mnemonic and executive aspects of working memory performance in schizophrenia and bipolar disorder with psychotic features, focusing particularly on the functional dynamics between task components. Twenty-four patients with schizophrenia, 14 patients with bipolar I disorder (manic phase) and 33 healthy control subjects were assessed using the Cambridge Neuropsychological Test Automated Battery (CANTAB): including the spatial working memory (between search errors and strategy scores) spatial span (storage capacity) and spatial planning (Stockings of Cambridge: accuracy and latency) tasks. Both patient groups were impaired on the spatial span task, which requires the maintenance and retrieval of stored information. In contrast, only schizophrenia patients showed a significant deficit in between search errors, which requires both maintenance and manipulation of information in working memory. That is, they exhibited both a mnemonic and an executive dysfunction. Spatial span was particularly important to accurate planning ability in bipolar patients. In contrast, in patients with schizophrenia poor spatial working memory was a significant predictor of planning impairments, consistent with failures in goal selection, evaluation and/or execution. Furthermore, initial planning time was positively correlated with the latency to complete a planning sequence. This pattern of slow cognitive processing in schizophrenia patients only, resembled that reported previously in patients with basal ganglia disorders. These findings are discussed in terms of a possible

  6. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  7. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  8. Stock-based vs. fleet-based evaluation of the multi-annual management plan for the cod stocks in the Baltic Sea

    DEFF Research Database (Denmark)

    Bastardie, Francois; Vinther, Morten; Nielsen, J. Rasmus

    2010-01-01

    This study evaluated the EU 2008 multi-annual plan for Baltic cod stock recovery. The plan combines harvest control rules that set TACs with reductions in direct effort (E) and fishing mortality (F). Performance and robustness of the plan are tested with a management strategy evaluation model (MS....... Medium term economic evaluation of fishery performance shows an initial reduction in profit with effort and TAC reductions, but profit is always positive. (C) 2009 Elsevier B.V. All rights reserved.......This study evaluated the EU 2008 multi-annual plan for Baltic cod stock recovery. The plan combines harvest control rules that set TACs with reductions in direct effort (E) and fishing mortality (F). Performance and robustness of the plan are tested with a management strategy evaluation model (MSE...

  9. The attitudes of social work students toward end-of-life care planning.

    Science.gov (United States)

    Kwon, Sung Ae; Kolomer, Stacey; Alper, Jamie

    2014-01-01

    This study examined the attitudes of social work students toward end-of-life care planning, as well as their degree of willingness to engage in this area of social work practice. Factors associated with their attitudes were measured through structured surveys completed by 102 social work students (N = 102) at a school of social work in the southeast. Results indicated that these social work students tended to have positive attitudes toward end-of-life care planning in general. Moreover, these attitudes were positively associated with preference for pain relief treatment, higher levels of comfort when discussing death, more emphasis on self-determination, and apprehension of conflicts of self-determination. The results of this study underscored the increased societal need for recognition of personal preferences in end-of-life care, higher levels of comfort when discussing death, and an increased commitment of social workers' to maintaining the ethical principle of the client's right to self-determination in end-of-life planning. While this is not surprising, it points to a continuing need to re-assess where the field stands in its preparation of social work professionals who will work closely with people who are dying and their families.

  10. Inventory and Monitoring (I&M) Initiative FY 2013 Annual Report and FY 2014 Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This report describes implementation of the National Wildlife Refuge System's I results from all eight regions and the I&M Branch of the Natural Resource Program...

  11. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-22

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  12. Indoor climate, psychosocial work environment and symptoms in open-plan offices

    DEFF Research Database (Denmark)

    Pejtersen, J; Allermann, L; Kristensen, T S

    2006-01-01

    -plan offices, whereas eight buildings had a mixture of cellular, multi-person and open-plan offices. A total of 2301 occupants, corresponding to a response rate of 72%, completed a retrospective questionnaire. The questionnaire comprised questions concerning environmental perceptions, mucous membrane......-person and cellular offices. The association between psychosocial factors and office size was weak. Open-plan offices may not be suited for all job types. PRACTICAL IMPLICATION: Open-plan offices may be a risk factor for adverse environmental perceptions and symptoms.......To study the indoor climate, the psychosocial work environment and occupants' symptoms in offices a cross-sectional questionnaire survey was made in 11 naturally and 11 mechanically ventilated office buildings. Nine of the buildings had mainly cellular offices; five of the buildings had mainly open...

  13. International Energy Agency (IEA) Working Party on Energy Conservation Research and Development. Annual report, 1976--1977

    Energy Technology Data Exchange (ETDEWEB)

    1977-08-01

    This annual report of the IEA Working Party on energy conservation described briefly the background and objectives of each project area, the status of its implementing agreement, its organizational structure, and current activities. The Committee on Energy R and D has established 15 working areas: biomass conversion; coal technology; conservation R and D; energy R and D strategy; fusion; geothermal; high-temperature reactors for process heat; hydrogen; nuclear safety; ocean thermal energy conversion; radioactive waste management; small solar power systems; solar energy; wave power; and wind power. Presently, the Working Party has implementing agreements and is working in 7 areas: buildings and community systems; building complexes; ekistics; combustion; energy cascading; heat pumps; and heat transfer. (MCW)

  14. Final work plan : investigation of potential contamination at the former USDA facility in Ramona, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work that will be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Ramona, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential source areas on the property, (2) determine the vertical and horizontal extent of potential contamination, and (3) provide recommendations for future actions, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the United States Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy. Under the Intergovernmental Agreement, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. The Master Work Plan was approved by the KDHE. It contains materials common to investigations at locations in Kansas and should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Ramona.

  15. Consider the OIG Work Plan in your 2012 internal audit schedules.

    Science.gov (United States)

    Schaum, Kathleen D

    2011-12-01

    Wound care professionals should conduct monthly internal audits of their business processes. In addition to auditing, the coding, payment, and coverage issues that are considered issues by the Medicare contractor that processes your claims and the Medicare contractors that audit your claims and payments, be sure to include the OIG Work Plan topics that pertain to your wound care business. Remember, if atopic is important enough to make the OIG Work Plan, it should be important enough to make your 2012 internal audit plan. Because the Medicare Trust Fund is important to all US citizens, everyone has a responsibility to assist in combating fraud, waste, abuse, and mismanagement in HHS programs. Therefore, the OIG Hotline accepts tips from all sources. To provide a tip to the OIG Hotline, see Table 1 for contact information.

  16. Stillwater National Wildlife Refuge and Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — An estimated 70,000 acre feet(AF) of water are needed annually to maintain 14,000 acres of marsh currently administered by the Stillwater NWR. The 1993 water...

  17. 7 CFR 1710.251 - Construction work plans-distribution borrowers.

    Science.gov (United States)

    2010-01-01

    ...) Transmission and substation facilities required to support the distribution system; (6) Distribution equipment... 7 Agriculture 11 2010-01-01 2010-01-01 false Construction work plans-distribution borrowers. 1710...—distribution borrowers. (a) All distribution borrowers must maintain a current CWP approved by their board...

  18. Work plan for defining a standard inventory estimate for wastes stored in Hanford site underground tanks

    Energy Technology Data Exchange (ETDEWEB)

    Kupfer, M.J.

    1995-09-29

    This work plan addresses the methodology for defining a tank waste database that will provide a best basis estimate of waste characteristics for each underground storage tank. The resulting database is expected to be in place in a network accessible electronic form by September 1996.

  19. The Interplay between Women's Life Course Work Patterns and Financial Planning for Later Life

    Science.gov (United States)

    Berger, Ellie D.; Denton, Margaret A.

    2004-01-01

    In order to gain a comprehensive understanding of the interplay between women's life course work patterns and their financial planning for later life, we examined data from semi-structured interviews with retired women (n = 28) aged 59 to 92. The majority of women disrupted their careers at some point in time, for an average of 14 years, primarily…

  20. Small Wars 2.0: A Working Paper on Land Force Planning After Iraq and Afghanistan

    Science.gov (United States)

    2011-02-01

    specific brand of small war — i.e., neo-classical COIN in the Near East and South Asia. This move relies on four questionable assumptions: 1...Afghanistan Small Wars 2.0: A Working Paper on Land Force Planning After Iraq and Afghanistan indefinitely. While the current full-spectrum mantra cham

  1. A social survey on the noise impact in open-plan working environments in China.

    Science.gov (United States)

    Zhang, Mei; Kang, Jian; Jiao, Fenglei

    2012-11-01

    The aim of this study is to reveal noise impact in open-plan working environments in China, through a series of questionnaire surveys and acoustic measurements in typical open-plan working environments. It has been found that compared to other physical environmental factors in open-plan working environments, people are much less satisfied with the acoustic environment. The noise impact in the surveyed working environments is rather significant, in terms of sound level inside the office, understanding of colleagues' conversation, and the use of background music such as music players. About 30-50% of the interviewees think that various noise sources inside and outside offices are 'very disturbing' and 'disturbing', and the most annoying sounds include noises from outside, ventilation systems, office equipment, and keyboard typing. Using higher panels to separate work space, or working in enclosed offices, are regarded as effective improvement measures, whereas introducing natural sounds to mask unwanted sounds seems to be not preferable. There are significant correlations between the evaluation of acoustic environment and office symptoms, including hypersensitivity to loud sounds, easily getting tired and depression. There are also significant correlations between evaluation of various acoustics-related factors and certain statements relating to job satisfaction, including sensitivity to noise, as well as whether conversations could be heard by colleagues.

  2. Maintaining professional confidence--monitoring work with obese schoolchildren with support of an action plan.

    Science.gov (United States)

    Müllersdorf, Maria; Zuccato, Linda Martinson; Nimborg, Jennie; Eriksson, Henrik

    2010-03-01

    School nurses meet obese children in their everyday work. Although school nurses acknowledge the importance of getting hold of school children's obesity, they seem to lack strategies enabling them to handle the delicacy of the problem. The aim of this study was to describe how school nurses perceive their work with obese children with support of an action plan. Qualitative in-depth interviews were performed with six school nurses working in a municipality, where an action plan for the work with obese school-age children had been implemented. The transcribed data was analysed by a manifest content analysis. The results showed that the informants perceived having a key role in the obesity work, which they experienced as meaningful, but full of pitfalls. They found themselves suitable for the task, but perceived lacking deeper knowledge about specific modes of work such as motivational conversation. As the task was considered delicate, there were great demands for guidelines, education and cooperation. The action plan served as support for maintaining professional confidence throughout the process, but there was room for improvements.

  3. Third Annual National Leadership Development Seminar for State Directors of Vocational Education. Articulation of Vocational Education Planning with Comprehensive State Planning.

    Science.gov (United States)

    Ward, Darrell L., Comp.; Kazarian, Edward N., Comp.

    More than 100 state directors and other leaders from 45 states, the District of Columbia, and Puerto Rico attended a 3-day inservice leadership development seminar to exchange information and examine coordinated state planning as it relates to programing in vocational-technical education. Seminar activities included group work sessions, a…

  4. Family planning education: working with target groups in the South Pacific.

    Science.gov (United States)

    Winn, M

    1992-07-01

    Family planning education programs are commonly designed by expert educators who are far removed, in location and experience, from their target audiences. Educators operate on the premise that their job is simply to develop strategies to successfully transfer their knowledge to the target audience. Judgements are often colored by a determination not to offend local sensibilities, which can lead educators to uncritically adopt the local wisdom about what is and is not culturally acceptable. A proper exploration of sexuality is absent from most family planning programs. Usual features of expert-designed family planning programs are an admonishment about people having too many children (the stick), a clear rationale for having fewer children (the carrot), the provision of detailed contraceptive information (the means), and the encouragement of individuals to exercise some personal control over their fertility (the ends). This standard model, although widely used throughout the Pacific, was not adopted by the Family Planning Federation of Australia in its regional family planning education work. The Federation, in conjunction with the independent Family Planning Association in the South Pacific, has taken a more participatory, learner-focused approach that values the contribution of the audience in all phases of the program. There is a huge need to target men, particularly young, unmarried men. The Federation found that not only did Pacific men want to view and discuss the women's documentary video Taboo Talk about family planning issues, they wanted their own men's version. The Federation soon discovered that attempts to meet the requests can easily flounder on the issue of language. The Federation has worked with the target audience to develop a lexicon of acceptable words for reproductive health education.

  5. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  6. University of South Florida St. Petersburg Work Plan Presentation for 2014-15 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  7. University of South Florida--System Work Plan Presentation for 2012-13 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2012

    2012-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  8. University of South Florida Sarasota-Manatee Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  9. University of South Florida St. Petersburg Work Plan Presentation for 2013-14 Board of Governors Review

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2013

    2013-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' new "Strategic Plan 2012-2025" is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's "Annual Accountability Report" provides yearly tracking for how…

  10. Annual Water Management Plan Parts I and II : Mark Twain National Wildlife Refuge : Brussels District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mark Twain National Wildlife Refuge Water Management Plan aims to develop a practical schedule for water management on the Calhoun, Batchtown and Gilbert Lake...

  11. Colorado geothermal commercialization planning. Semi-annual progress report, January 1, 1979-June 30, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Coe, B.A.

    1979-01-01

    The potential for developing the geothermal resources of Colorado is detailed. Constraints that are limiting geothermal energy development are described. Area development plans, an institutional analysis, and the outreach program are presented. (MHR)

  12. Deputy Inspector General for audit services. FY 1998 annual performance plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-30

    This plan outlines the audie strategies that the Deputy Inspector General for Audit Services intends to implement and execute in Fiscal Year (FY) 1998. The plan also includes the details of efforts to improve customer service and to implement the Inspector General`s streamlining initiatives. The FY 1997/1998 Strategic Plan emphasizes six key issue areas: Financial Management, Contract Administration, Program Management, Environmental Quality, Infrastructure and Administrative Safeguards. These issue areas were chosen to ensure that the Inspector General`s audit, inspection, and investigative functions are focused to assist the Department to reach its goals, pursue its strategies, and monitor its success indicators. This plan also establishes goals, objectives, and performance measures, which are discussed in detail in Appendix I.

  13. Developing a health and safety plan for hazardous field work in remote areas.

    Science.gov (United States)

    Gochfeld, Michael; Volz, Conrad D; Burger, Joanna; Jewett, Stephen; Powers, Charles W; Friedlander, Barry

    2006-12-01

    Developing health and safety plans (HASPs) is a common feature of occupational safety and health for many workplaces. Formal HASPs are a requirement for hazardous waste work, requiring the anticipation and identification of hazards and embodying the training, equipping, and evaluation of workers. Aside from OSHA, there are relatively few manuals or examples and virtually no papers that provide practical guidance in what a HASP should cover or how to create and implement one. Moreover, existing guidance refers to spatially circumscribed worksites. This article details development of a HASP to cover field researchers and ship personnel conducting scientific research in a remote area of the world (Amchitka Island in the western Aleutians), hundreds of kilometers from the nearest emergency room. It required characterizing the kinds of work to be performed and anticipating the hazards that could be encountered. It illustrates the meshing of a general HASP with a ship safety plan, a dive safety plan, and specialized topics, including stop-work authority, rock climbing, firearms, vehicle safety, and communication strategy. Remote area operations are a growing challenge facing the profession. An expedition of this sort requires extensive planning and experienced safety personnel and cannot rely on luck to ensure the safe return of participants.

  14. Northeast Artificial Intelligence Consortium Annual Report 1987. Volume 2, Part B. Discussing, Using, and Recognizing Plans

    Science.gov (United States)

    1989-03-01

    1978. Williams. B.C. Qualitative Analysis of MOS Circuits. Artificial Inteligence . 1984. 24.. Wilson. K. From Association to Structure. Amsterdam:North...D-A208 378 RADC-TR-88-324, Vol II (of nine), Part B Interim Report March 1969 4. NORTHEAST ARTIFICIAL INTELLIGENCE CONSORTIUM ANNUAL REPORT 1987...II (of nine), Part B 6a. NAME OF PERFORMING ORGANIZATION 6b. OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION Northeast Artificial (ff ’aolicbl

  15. Northeast Artificial Intelligence Consortium Annual Report. Volume 2. 1988 Discussing, Using, and Recognizing Plans (NLP)

    Science.gov (United States)

    1989-10-01

    Encontro Portugues de Inteligencia Artificial (EPIA), Oporto, Portugal, September 1985. [15] N. J. Nilsson. Principles Of Artificial Intelligence. Tioga...FI1 F COPY () RADC-TR-89-259, Vol II (of twelve) Interim Report October 1969 AD-A218 154 NORTHEAST ARTIFICIAL INTELLIGENCE CONSORTIUM ANNUAL...7a. NAME OF MONITORING ORGANIZATION Northeast Artificial Of p0ilcabe) Intelligence Consortium (NAIC) Rome_____ Air___ Development____Center

  16. The effects of moderate heat stress and open-plan office noise distraction on office work

    DEFF Research Database (Denmark)

    Witterseh, Thomas; Wyon, David; Clausen, Geo

    2002-01-01

    Thirty subjects clothed for comfort at 22 deg.C performed simulated office work for 3 hours at 22/26/30 deg.C (7.4 g/kg dry air, i.e. 45/35/28 %RH) in quiet and recorded open-plan office noise (55 dBA) conditions. Warmth decreased perceived air quality (P......Thirty subjects clothed for comfort at 22 deg.C performed simulated office work for 3 hours at 22/26/30 deg.C (7.4 g/kg dry air, i.e. 45/35/28 %RH) in quiet and recorded open-plan office noise (55 dBA) conditions. Warmth decreased perceived air quality (P...

  17. 77 FR 24440 - Approval and Promulgation of Air Quality Implementation Plans; North Carolina; Annual Emissions...

    Science.gov (United States)

    2012-04-24

    ... Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4..., Chief, Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management...-8960. Such deliveries are only accepted during the Regional Office's normal hours of operation....

  18. Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B.

    2001-04-30

    The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  19. 78 FR 48159 - Preliminary 2012 Effluent Guidelines Program Plan and 2011 Annual Effluent Guidelines Review Report

    Science.gov (United States)

    2013-08-07

    ... captured and included as part of the comment that is placed in the public docket and made available on the... delist from the effluent guidelines plan the rulemaking for the Coalbed Methane Extraction subcategory... Regenerated Cellulose Manufacturers (previously categorized as Plastics Molding and Forming (40 CFR Part...

  20. Project Work Plan: Hanford 100-D Area Treatability Demonstration - In Situ Biostimulation for Reducing Barrier

    Energy Technology Data Exchange (ETDEWEB)

    Fruchter, Jonathan S.; Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.

    2006-05-31

    This work plan supports a new, integrated approach to accelerate cleanup of chromium in the Hanford 100 Areas. This new approach will provide supplemental treatment upgradient of the ISRM barrier by directly treating chromium and other oxidizing species in groundwater (i.e., nitrate and dissolved oxygen), thereby increasing the longevity of the ISRM barrier and protecting the ecological receptors and human health at the river boundary.

  1. Knowledge co-production and boundary work to promote implementation of conservation plans.

    Science.gov (United States)

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  2. A preliminary model of work during initial examination and treatment planning appointments.

    Science.gov (United States)

    Irwin, J Y; Torres-Urquidy, M H; Schleyer, T; Monaco, V

    2009-01-10

    Objective This study's objective was to formally describe the work process for charting and treatment planning in general dental practice to inform the design of a new clinical computing environment.Methods Using a process called contextual inquiry, researchers observed 23 comprehensive examination and treatment planning sessions during 14 visits to 12 general US dental offices. For each visit, field notes were analysed and reformulated as formalised models. Subsequently, each model type was consolidated across all offices and visits. Interruptions to the workflow, called breakdowns, were identified.Results Clinical work during dental examination and treatment planning appointments is a highly collaborative activity involving dentists, hygienists and assistants. Personnel with multiple overlapping roles complete complex multi-step tasks supported by a large and varied collection of equipment, artifacts and technology. Most of the breakdowns were related to technology which interrupted the workflow, caused rework and increased the number of steps in work processes.Conclusion Current dental software could be significantly improved with regard to its support for communication and collaboration, workflow, information design and presentation, information content, and data entry.

  3. Report of the GRAPPA-OMERACT Psoriatic Arthritis Working Group from the GRAPPA 2015 Annual Meeting.

    Science.gov (United States)

    Orbai, Ana-Maria; Mease, Philip J; de Wit, Maarten; Kalyoncu, Umut; Campbell, Willemina; Tillett, William; Eder, Lihi; Elmamoun, Musaab; FitzGerald, Oliver; Gladman, Dafna D; Goel, Niti; Gossec, Laure; Lindsay, Chris A; Steinkoenig, Ingrid; Helliwell, Philip S; McHugh, Neil J; Strand, Vibeke; Ogdie, Alexis

    2016-05-01

    The GRAPPA-OMERACT psoriatic arthritis (PsA) working group is in the process of updating the PsA core domain set to improve and standardize the measurement of PsA outcomes. Work streams comprise literature reviews of domains and outcome measurement instruments, an international qualitative research project with PsA patients to generate domains important to patients, outcome measurement instrument assessment, conduct of domain consensus panels with patients and physicians, and evidence-based selection of instruments. Patient research partners are involved in each of the projects. The working group will present findings and seek endorsement for the new PsA core domain set, outcome measurement set, and research agenda at the OMERACT meeting in May 2016.

  4. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  5. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integration of environment, safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning...

  6. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integration of environment... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning...

  7. 77 FR 50165 - Escape and Evacuation Plans for Surface Coal Mines, Surface Facilities and Surface Work Areas of...

    Science.gov (United States)

    2012-08-20

    ... Administration. Title: Escape and Evacuation Plans for Surface Coal Mines, Surface Facilities ] and Surface Work... Safety and Health Administration Escape and Evacuation Plans for Surface Coal Mines, Surface Facilities and Surface Work Areas of Underground Coal Mines AGENCY: Mine Safety and Health Administration,...

  8. Aging and Faculty Distribution of Their Work Effort. ASHE 1986 Annual Meeting Paper.

    Science.gov (United States)

    Lawrence, Janet H.; Blackburn, Robert T.

    The relative impact of the aging process, pervasive changes in higher education, and career socialization experiences on college faculty members' distributions of work effort was studied. Secondary analyses were completed on the following surveys: the Carnegie Commission on Higher Education Survey (1969) and the Survey of the American…

  9. Intrinsic Satisfactions from Academic Versus Other Professional Work: A Comparative Analysis. ASHE Annual Meeting 1981 Paper.

    Science.gov (United States)

    Bess, James L.

    Recent theories of professional work satisfaction are reviewed and applied to the college or university professor. Additionally, the professional satisfactions available to the academic person are compared with those of professionals in other occupations. The following theories of job satisfaction are examined: job facets theory, expectancy…

  10. Interim Report on ISO TC 163 Working Group 3. Annual progress report

    Energy Technology Data Exchange (ETDEWEB)

    Fairey, Philip [Florida Solar Energy Center, Cocoa, FL (United States)

    2009-04-02

    This reports cover the initial year efforts of the International Standards Organization (ISO) to develop international standards for rating the energy performance of buildings. The author of this report is a participant in this effort. This report summarizes the activities of the ISO Working Group charged with development of these standards and makes recommendations to the sponsors for future U.S. involvement in this ISO effort.

  11. ERDA Interlaboratory Working Group for Data Exchange (IWGDE). Annual report for fiscal year 1976

    Energy Technology Data Exchange (ETDEWEB)

    Merrill, D.; Austin, D. (eds.)

    1976-09-01

    The activities of the ERDA IWGDE (Interlaboratory Working Group for Data Exchange) during fiscal year 1976 are discussed. The IWGDE was created in response to an evident need for increased sharing of resources among ERDA installations. During fiscal year 1976 it was supported through funds allocated to the Energy Analysis and Assessment programs of seven multipurpose ERDA national laboratories. Principal accomplishments included the interlaboratory exchange of socio-economic, environmental, demographic, and energy-related data bases, liaison development through interlaboratory meetings, creation of a national index of energy-related models and data bases, and definition and partial implementation of a computer-independent standard for exchange of data via magnetic tape.

  12. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    Energy Technology Data Exchange (ETDEWEB)

    SCHULTZ, E.A.

    1998-10-01

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  13. Basic problems and advances in the area of planning enterprises for working nonmetal mineral fields

    Energy Technology Data Exchange (ETDEWEB)

    Tudor, Gh.; Bucur, S.; Gavriliu, M.; Rusu, A.; Tamas, V.

    1980-01-01

    An examination is made of the problems and achievements in the area of planning enterprises for working fields of calcium, feldspar, kaolin, graphite, asbestos, rock salt, dolomite associated with the improvement in the economy of production, reduction in the consumption of energy and scarce materials. The developed program for improving the efficiency of production of nonmetal mineral stipulates an improvement in labor productivity, more efficient and more complete use of reserves, decrease in the volume of construction operations, improvement in the technology of extraction, increase in the degree of automation of processes, more skillful planning of the surface equipment for extraction and enrichment, reduction in the dimensions of designs of the units designed for enrichment and extraction, improvement in the efficient consumption of electricity with the help of a new system of power and distribution, reduction in consumption of fuel by the use of less expensive. A description is made of the different examples making it possible to achieve advances in these areas.

  14. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  15. Effects of Individual Differences in Working Memory on Plan Presentational Choices

    Directory of Open Access Journals (Sweden)

    Nava Tintarev

    2016-11-01

    Full Text Available This paper addresses research questions that are central to the area of visualization interfaces for decision support: RQ1 whether individual user differences in working memory should be considered when making choosing how to present visualizations; RQ2 how to present the visualization to support effective decision making and processing; and RQ3 how to evaluate the effectiveness of presentational choices. These questions are addressed in the context of presenting plans, or sequences of actions, to users. The experiments are conducted in several domains, and the findings are relevant to applications such as semi-autonomous systems in logistics. That is, scenarios that require the attention of humans who are likely to be interrupted, and require good performance but are not time critical. Following a literature review of different types of individual differences in users that have been found to affect the effectiveness of presentational choices, we consider specifically the influence of individuals' working memory (RQ1. The review also considers metrics used to evaluate presentational choices, and types of presentational choices considered. As for presentational choices (RQ2, we consider a number of variants including interactivity, aggregation, layout, and emphasis. Finally, to evaluate the effectiveness of plan presentational choices (RQ3 we adopt a layered-evaluation approach and measure performance in a dual task paradigm, involving both task interleaving and evaluation of situational awareness. This novel methodology for evaluating visualizations is employed in a series of experiments investigating presentational choices for a plan. A key finding is that emphasizing steps (by highlighting borders can improve effectiveness on a primary task, but only when controlling for individual variation in working memory.

  16. The 24th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    Sydnor, Richard L.

    1993-01-01

    A compilation of technical papers presented at the 24th Precise Time and Time Interval (PTTI) Applications and Planning Meeting held in Dec. 1992 is presented. Papers are in the following categories: recent developments in rubidium, cesium, and hydrogen-based frequency standards, and in cryogenic and trapped-ion technology; international and transnational applications of PTTI technology with emphasis on satellite laser tracking networks, GLONASS timing, intercomparison of national time scales, and international telecommunications; applications of PTTI technology to the telecommunications, power distribution, and platform positioning, and geophysical survey industries; applications of PTTI technology to evolving military communications and navigation systems; and dissemination of precise time and frequency by means of GPS, GLONASS, MILSTAR, Loran, and synchronous communications satellites.

  17. KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan

    Science.gov (United States)

    Starr, A. Scott; Applegate, Joe

    2014-01-01

    This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.

  18. Current Work in Energy Analysis (Energy Analysis Program -1996 Annual Report)

    Energy Technology Data Exchange (ETDEWEB)

    Energy Analysis Program

    1998-03-01

    This report describes the work that Environmental Energy Technologies Division of Lawrence Berkeley National Laboratory has been doing most recently. One of our proudest accomplishments is the publication of Scenarios of U.S. Carbon Reductions, an analysis of the potential of energy technologies to reduce carbon emissions in the U.S. This analysis played a key role in shaping the U.S. position on climate change in the Kyoto Protocol negotiations. Our participation in the fundamental characterization of the climate change issue by the IPCC is described. We are also especially proud of our study of ''leaking electricity,'' which is stimulating an international campaign for a one-watt ceiling for standby electricity losses from appliances. This ceiling has the potential to save two-thirds of the 5% of U.S. residential electricity currently expended on standby losses. The 54 vignettes contained in the following pages summarize results of research. activities ranging in scale from calculating the efficacy of individual lamp ballasts to estimating the cost-effectiveness of the national ENERGY STAR{reg_sign} labeling program, and ranging in location from a scoping study of energy-efficiency market transformation in California to development of an energy-efficiency project in the auto parts industry in Shandong Province, China. These are the intellectual endeavors of a talented team of researchers dedicated to public service.

  19. The Impact of Appearance Management Training, Work Status, and Plans after High School on Opinions Regarding Appearance at Work and School

    Science.gov (United States)

    Freeburg, Beth Winfrey; Arnett, Sally E.

    2010-01-01

    The purpose of this study was to measure the effect of appearance management training, work status, and plans after high school on students' opinions about appearance at school and at work. A nonprobability sample of 132 high school juniors and seniors in a consumer education class were administered the Appearance Management Survey before and…

  20. Preparedness strategy and procedures. Annual report 1996. Plans for 1997; Beredskabsstrategi og -procedure. Aarsrapport 1996. Planer for 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    EKO-3 Preparedness Strategy and Procedures, a title that covers the subjects - collection, quality assurance, and the use of data in a preparedness situation. The term data is used here in its widest sense covering measurements, samples, radioecological background information, etc. The following sub-projects are part of EKO-3: EKO-3.1 Mobile measurements; EKO-3.2 Quality Assurance in sampling and analysis; EKO-3.3 Operational intervention levels; EKO-3.4 Measurement strategy, basis for decisions, and interventions in agriculture. EKO-3.1 which was the first started project is more or less completed. The sub-project will, however, continue with reference to a common NKS-EU follow-up exercise on RESUME-95 in 1998 - RESUME-98. In 1996 most funds has been given to EKO-3.2. The different parts of the project have been launched and the first of them are approaching their conclusion, this is the case for for example Quality assurance in gamma spectroscopy with accreditation as a goal. For 1997 a number of `typical` Nordic scenarios is planned. EKO-3.4 too has proceeded as planned in 1996. Also in this project the work has partly been on planning. The project work proceeds well and a draft version of the final report is expected ultimo 1996. (EG).

  1. Revitalizing communities together: the shared values, goals, and work of education, urban planning, and public health.

    Science.gov (United States)

    Cohen, Alison Klebanoff; Schuchter, Joseph W

    2013-04-01

    Inequities in education, the urban environment, and health co-exist and mutually reinforce each other. Educators, planners, and public health practitioners share commitments to place-based, participatory, youth-focused, and equitable work. They also have shared goals of building community resilience, social capital, and civic engagement. Interdisciplinary programs that embody these shared values and work towards these shared goals are emerging, including school-based health centers, full-service community schools, community health centers, Promise Neighborhoods, and Choice Neighborhoods. The intersection of these three fields represents an opportunity to intervene on social determinants of health. More collaborative research and practice across public health, education, and planning should build from the shared values identified to continue to address these common goals.

  2. 1995 Annual Report and Five Year (1995-1999) Strategic Investment Plan

    Science.gov (United States)

    1996-08-01

    benzoic, toluic, salicylic acids and isomers). This applied research project builds on the basic work begun with USEPA-RSKERL support (Barcelona...recycle by evaporation and distillation has been used in uranium operations at Y-12. Savannah River Site has recovered and reconcentrated nitric acid as...DFSS DMMF DNA Benzene Bureau of Land Management Benzene, Toluene, Ethylbenzene, and Xylene Chromic Acid Anodizing Clean Air Act Amendments

  3. Large capacity, multi-fuel, and high temperature working fluid heaters to optimize CSP plant cost, complexity and annual generation

    Science.gov (United States)

    Peterseim, J. H.; Viscuso, L.; Hellwig, U.; McIntyre, P.

    2016-05-01

    This paper analyses the potential to optimize high temperature fluid back-up systems for concentrating solar power (CSP) plants by investigating the cost impact of component capacity and the impact of using multiple fuels on annual generation. Until now back-up heaters have been limited to 20MWth capacity but larger units have been realised in other industries. Installing larger units yields economy-of-scale benefits through improved manufacturing, optimised transport, and minimized on-site installation work. Halving the number of back-up boilers can yield cost reduction of 23% while minimizing plant complexity and on-site construction risk. However, to achieve these benefits it is important to adapt the back-up heaters to the plant's requirements (load change, capacity, minimum load, etc.) and design for manufacture, transport and assembly. Despite the fact that biomass availability is decreasing with increasing direct normal irradiance (DNI), some biomass is available in areas suitable for CSP plants. The use of these biomass resources is beneficial to maximise annual renewable energy generation, substitute natural gas, and use locally/seasonally available biomass resources that may not be used otherwise. Even small biomass quantities of only 50,000 t/a can increase the capacity factor of a 50MWe parabolic trough plant with 7h thermal energy storage from 40 to 49%. This is a valuable increase and such a concept is suitable for new plants and retrofit applications. However, similar to the capacity optimisation of back-up heaters, various design criteria have to be considered to ensure a successful project.

  4. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  5. Determination of the learning needs of doctors working in the Mountain Plan in Cienfuegos province.

    Directory of Open Access Journals (Sweden)

    Manuel Fernández Urquiza

    2003-12-01

    Full Text Available Introduction: It is of great importance for the country´s educational strategy the constant studying of the staff already formed either technically or professionally . The actions within the Post graduate subsystem have been growing in organisation and maturity. The learning are determined and priorised taking into account the improving principles of the determination of the health personnel needs, the population needs and their level of satisfaction. Objectives: To carry out the diagnosis of the professional´s learning needs who are working at hospitals and consultations offices at the Turquino Plan in Cienfuegos province. Method: It is a qualitative research . The universe is formed by the staff working at the 2 hospitals and the 18 consultation offices at the Turquino Plan in Cienfuegos. The methods used are: Observation, Interviews to experts, Surveys and Group Dynamics. The techniques were applied taking into consideration David Leyva´s deductive model and Peter Park Investigation in Action. Results: learning needs were identified derived from professional competence . The Infrastructure problems that limit such competence was also defined

  6. Plan for improving the organizational climate variables that affect work performance in a state enterprise

    Directory of Open Access Journals (Sweden)

    Bibiana Cubillos Rivera

    2014-07-01

    Full Text Available This investigation presents an analysis on the assessments of organizational climate and work performance of a state enterprise. From this analytical process and based on the results obtained in interviews applied to the managers of the organization, as well as in the theoretical review of these two variables and their relationship to each other, those aspects of organizational climate that most affect the results of the staff are determined. An improvement plan is proposed for the organization, focused on two strategies that directly affect work performance through the intervention of the organizational climate variables that affect it negatively, thus ensuring that this, in turn, is reflected in the scope of both individual and corporate goals. This will also check that, from the area of human management, it can directly influence the strategy of the organizations, ceasing to be seen as an area of support and showing that it can be fully aligned with the mission, vision and in the overall organizational planning.

  7. 78 FR 66071 - Proposed Information Collection; Slope and Shaft Sinking Plans (Pertains to Surface Work Areas of...

    Science.gov (United States)

    2013-11-04

    ... Safety and Health Administration Proposed Information Collection; Slope and Shaft Sinking Plans (Pertains to Surface Work Areas of Underground Coal Mines) AGENCY: Mine Safety and Health Administration, Labor... information collection for Slope and Shaft Sinking Plans, 30 CFR 77.1900. DATES: All comments must...

  8. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    Energy Technology Data Exchange (ETDEWEB)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  9. Factors affecting planned return to work after trauma: A prospective descriptive qualitative and quantitative study.

    Science.gov (United States)

    Folkard, S S; Bloomfield, T D; Page, P R J; Wilson, D; Ricketts, D M; Rogers, B A

    2016-12-01

    The use of patient reported outcome measures (PROMs) in trauma is limited. The aim of this pilot study is to evaluate qualitative responses and factors affecting planned return to work following significant trauma, for which there is currently a poor evidence base. National ethical approval was obtained for routine prospective PROMs data collection, including EQ-5D, between Sept 2013 and March 2015 for trauma patients admitted to the Sussex Major Trauma Centre (n=92). 84 trauma patients disclosed their intended return to work at discharge. Additional open questions asked 'things done well' and 'things to be improved'. EQ-5D responses were valued using the time trade-off method. Statistical analysis between multiple variables was completed by ANOVA, and with categorical categories by Chi squared analysis. Only 18/68 of patients working at admission anticipated returning to work within 14days post-discharge. The injury severity scores (ISS) of those predicting return to work within two weeks and those predicting return to work longer than two weeks were 14.17 and 13.59, respectively. Increased physicality of work showed a trend towards poorer return to work outcomes, although non-significant in Chi-squared test in groups predicting return in less than or greater than two weeks (4.621, p=0.2017ns). No significant difference was demonstrated in the comparative incomes of patients with different estimated return to work outcomes (ANOVA r(2)=0.001, P=0.9590ns). EQ-5D scores were higher in those predicting return to work within two weeks when compared to greater than two weeks. Qualitative thematic content analysis of open responses was possible for 66/92 of respondents. Prominent positive themes were: care, staff, professionalism, and communication. Prominent negative themes were: food, ward response time, and communication. This pilot study highlights the importance of qualitative PROMs analysis in leading patient-driven improvements in trauma care. We provide standard

  10. The Timmons Savings Plan: A Working Document on a Plan to Encourage Families to Save for College.

    Science.gov (United States)

    Tierney, Michael L.

    The Timmons Savings Plan, which encourages families to save toward college costs, is analyzed. This plan allows for periodic (non-tax deductible) contributions to an account administered by the U.S. Department of the Treasury. The amount deposited would be matched by the federal government in exchange for the government's earning the interest on…

  11. Social Work Discharge Planning in Acute Care Hospitals in Israel: Clients' Evaluation of the Discharge Planning Process and Adequacy

    Science.gov (United States)

    Soskolne, Varda; Kaplan, Giora; Ben-Shahar, Ilana; Stanger, Varda; Auslander, Gail. K.

    2010-01-01

    Objective: To examine the associations of patients' characteristics, hospitalization factors, and the patients' or family assessment of the discharge planning process, with their evaluation of adequacy of the discharge plan. Method: A prospective study. Social workers from 11 acute care hospitals in Israel provided data on 1426 discharged…

  12. HAZWOPER work plan and site safety and health plan for the Alpha characterization project at the solid waste storage area 4 bathtubbing trench at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This work plan/site safety and health plan is for the alpha sampling project at the Solid Waste Storage Area 4 bathtubbing trench. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division and associated ORNL environmental, safety, and health support groups. This activity will fall under the scope of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER). The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. Work will be conducted in accordance with requirements as stipulated in the ORNL HAZWOPER Program Manual and applicable ORNL; Martin Marietta Energy Systems, Inc.; and U.S. Department of Energy policies and procedures. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project. Unforeseeable site conditions or changes in scope of work may warrant a reassessment of the stated protection levels and controls. All adjustments to the plan must have prior approval by the safety and health disciplines signing the original plan.

  13. 华盛顿核安全峰会工作计划%Work Plan of Washington Nuclear Security Summit

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    @@ This Work Plan supports the Communiqué of the Washington Nuclear Security Summit.It constitutes a political commitlnent bv the participating states to catty out,on a voluntary basis,applicable portions of this Work Plan,consistent with respective national laws and intemational obligations,in all aspects of the storage,use,transportation and disposal of uclear materials and in preventing non-state actors from obtaining the information required to use such materials for malicious purposes.

  14. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  15. Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure.

  16. Three Year Work Plan (2007--10) of the IUHPE Northern Part of the Western Pacific Region.

    Science.gov (United States)

    Nakahara, Toshitaka

    2008-09-01

    The article presents the work plan of the Vice President for the Northern Part of the Western Pacific Region of the IUHPE. The highlights of the plan include, firstly, the organization of the First Asia-Pacific Conference on Health Promotion and Health Education, which will take place in July 2009. Secondly, the plan proposes the establishment of a liaison office and an Internet journal to facilitate collaboration among individuals, groups and organizations working in health promotion and education in this culturally and linguistically diverse region.

  17. Measurement and Basic Physics Committee of the U.S. Cross-Section Evaluation Working Group annual report 1997

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D.L. [ed.] [comp.] [Argonne National Lab., IL (United States); McLane, V. [ed.] [comp.] [Brookhaven National Lab., Upton, NY (United States)

    1997-10-01

    The Cross-Section Evaluation Working Group (CSEWG) is a long-standing committee charged with responsibility for organizing and overseeing the US cross-section evaluation effort. It`s main product is the official US evaluated nuclear data file, ENDF. In 1992 CSEWG added the Measurements Committee to its list of standing committees and subcommittees. This action was based on a recognition of the importance of experimental data in the evaluation process as well as the realization that measurement activities in the US were declining at an alarming rate and needed considerable encouragement to avoid the loss of this resource. The mission of the Committee is to maintain contact with experimentalists in the Us and to encourage them to contribute to the national nuclear data effort. Improved communication and the facilitation of collaborative activities are among the tools employed in achieving this objective. In 1994 the Committee was given an additional mission, namely, to serve as an interface between the applied interests represented in CSEWG and the basic nuclear science community. Accordingly, its name was changed to the Measurement and Basic Physics Committee. The present annual report is the third such document issued by the Committee. It contains voluntary contributions from several laboratories in the US. Their contributions were submitted to the Chairman for compilation and editing.

  18. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  19. Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

  20. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  1. Site observational work plan for the UMTRA Project site at Falls City, Texas

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

  2. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    Science.gov (United States)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  3. Remedial Investigation Work Plan for J-Field, Aberdeen Proving Ground, Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, P.; Biang, R.; Dolak, D.; Dunn, C.; Haffenden, R.; Martino, L.; Patton, T.; Wang, Y.; Yuen, C.

    1995-03-01

    The purpose of an RI/FS is to characterize the nature and extent of the risks posed by contaminants present at a site and to develop and evaluate options for remedial actions. The overall objective of the RI is to provide a comprehensive evaluation of site conditions, types and quantities of contaminants present, release mechanisms and migration pathways, target populations, and risks to human health and the environment. The information developed during the RI provides the basis for the design and implementation of remedial actions during the FS. The purpose of this RI Work Plan is to define the tasks that will direct the remedial investigation of the J-Field site at APG.

  4. Measurement and Basic Physics Committee of the US cross-section evaluation working group. Annual report 1996

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D.L. [Argonne National Lab., IL (United States); McLane, V. [Brookhaven National Labs, Upton, NY (United States)

    1996-11-01

    The Cross-Section Evaluation Working Group (CSEWG) is a long-standing committee charged with the responsibility for organizing and overseeing the U.S. cross-section evaluation effort. It`s main product is the official U.S. evaluated nuclear data file, ENDF. The current version of this file is Version VI. All evaluations included in ENDF are reviewed and approved by CSEWG and issued by the U.S. Nuclear Data Center, Brookhaven National Laboratory. CSEWG is comprised of volunteers from the U.S. nuclear data community who possess expertise in evaluation methodologies and who collectively have been responsible for producing most of the evaluations included in ENDF. In 1992 CSEWG added the Measurements Committee to its list of standing committees and subcommittees. This action was based on a recognition of the importance of experimental data in the evaluation process as well as the realization that measurement activities in the U.S. were declining at an alarming rate and needed all possible encouragement to avoid the loss of this resource. The mission of the Committee is to maintain a network of experimentalists in the U.S. that would provide needed encouragement to the national nuclear data measurement effort through improved communication and facilitation of collaborative activities. In 1994, an additional charge was added to the responsibilities of this Committee, namely, to serve as an interface between the more applied interests represented in CSEWG and the basic nuclear science community. This annual report is the second such document issued by the Committee. It contains voluntary contributions from eleven laboratories in the U.S. which have been prepared by members of the Committee and submitted to the Chairman for compilation and editing. It is hoped that the information provided here on the work that is going on at the reporting laboratories will prove interesting and stimulating to the readers.

  5. It's that time of year again: have you read the 2013 Office of Inspector General work plan?

    Science.gov (United States)

    Schaum, Kathleen D

    2012-12-01

    The Work Plan is useful because it gives providers a preview of many of the OIG’s enforcement priorities planned for fiscal year 2013.Wound care providers should take advantage of this opportunity to determine how to focus their compliance program activities over the next 12 months.Wound care providers should read the Work Plan for Fiscal Year 2013 for further information and references about the OIG issues. The Work Plan will help you to identify corporate compliance risk areas that you should audit and for which you should create/upgrade policies. Be sure to read the document and take a proactive approach by conducting internal audits to identify areas of improvement that you can make before you receive an external audit.

  6. Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-03-12

    This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e

  7. Work plan for conducting an ecological risk assessment at J-Field, Aberdeen Proving Ground, Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Hlohowskyj, I.; Hayse, J.; Kuperman, R. [Argonne National Lab., IL (United States). Environmental Assessment Div.] [and others

    1995-03-01

    The Environmental Management Division of Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation and feasibility study (RI/FS) of the J-Field area at APG pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. J-Field is within the Edgewood Area of APG in Harford County, Maryland, and activities at the Edgewood Area since World War II have included the development, manufacture, testing, and destruction of chemical agents and munitions. The J-Field site was used to destroy chemical agents and munitions by open burning and open detonation. This work plan presents the approach proposed to conduct an ecological risk assessment (ERA) as part of the RI/FS program at J-Field. This work plan identifies the locations and types of field studies proposed for each area of concern (AOC), the laboratory studies proposed to evaluate toxicity of media, and the methodology to be used in estimating doses to ecological receptors and discusses the approach that will be used to estimate and evaluate ecological risks at J-Field. Eight AOCs have been identified at J-Field, and the proposed ERA is designed to evaluate the potential for adverse impacts to ecological receptors from contaminated media at each AOC, as well as over the entire J-Field site. The proposed ERA approach consists of three major phases, incorporating field and laboratory studies as well as modeling. Phase 1 includes biotic surveys of the aquatic and terrestrial habitats, biological tissue sampling and analysis, and media toxicity testing at each AOC and appropriate reference locations. Phase 2 includes definitive toxicity testing of media from areas of known or suspected contamination or of media for which the Phase 1 results indicate toxicity or adverse ecological effects. In Phase 3, the uptake models initially developed in Phase 2 will be finalized, and contaminant dose to each receptor from all complete pathways will be estimated.

  8. Effects of acoustic environment on work in private office rooms and open-plan offices - longitudinal study during relocation.

    Science.gov (United States)

    Kaarlela-Tuomaala, A; Helenius, R; Keskinen, E; Hongisto, V

    2009-11-01

    The aim was to determine how the perceived work environment, especially acoustic environment, and its effects differed in private office rooms and in open-plan offices. The subjects consisted of 31 workers who moved from private office rooms to open-plan offices and who answered the questionnaire before and after the relocation. Private office rooms were occupied only by one person while open-plan offices were occupied by more than 20 persons. Room acoustical descriptors showed a significant reduction in speech privacy after relocation. The noise level averaged over the whole work day did not change but the variability of noise level reduced significantly. Negative effects of acoustic environment increased significantly, including increased distraction, reduced privacy, increased concentration difficulties and increased use of coping strategies. Self-rated loss of work performance because of noise doubled. Cognitively demanding work and phone conversations were most distracted by noise. The benefits that are often associated with open-plan offices did not appear: cooperation became less pleasant and direct and information flow did not change. Nowadays, most office workers, independent of job type, are located in open-plan offices without the individual needs of privacy, concentration and interaction being analysed. This intervention study consisted of professional workers. Their work tasks mainly required individual efforts, and interaction between other workers was not of primary concern, although necessary. The results suggest that the open-plan office is not recommended for professional workers. Similar intervention studies should also be made for other job types.

  9. Final Rules for Grandfathered Plans, Preexisting Condition Exclusions, Lifetime and Annual Limits, Rescissions, Dependent Coverage, Appeals, and Patient Protections Under the Affordable Care Act. Final rules.

    Science.gov (United States)

    2015-11-18

    This document contains final regulations regarding grandfathered health plans, preexisting condition exclusions, lifetime and annual dollar limits on benefits, rescissions, coverage of dependent children to age 26, internal claims and appeal and external review processes, and patient protections under the Affordable Care Act. It finalizes changes to the proposed and interim final rules based on comments and incorporates subregulatory guidance issued since publication of the proposed and interim final rules.

  10. College and University Planning -- 1969. Selected Papers from Society for College and University Planning Annual Conference. (4th, Houston, Texas, August 17-20, 1969.)

    Science.gov (United States)

    Mayer, Frederick W., Ed.; Schmult, Carl V., Jr., Ed.

    Six major conference papers cover selected planning activities for eight institutions of higher education. Discussed are academic planning for the University of Houston; circulation, parking, and landscape planning for the University of California at Irvine; planning office organization and staffing at Harvard and Ohio State Universities; building…

  11. Theoretical Antecedents of Standing at Work: An Experience Sampling Approach Using the Theory of Planned Behavior

    Directory of Open Access Journals (Sweden)

    M. Renée Umstattd Meyer

    2016-09-01

    Full Text Available Time spent sitting has been associated with an increased risk of diabetes, cancer, obesity, and mental health impairments. However, 75% of Americans spend most of their days sitting, with work-sitting accounting for 63% of total daily sitting time. Little research examining theory-based antecedents of standing or sitting has been conducted. This lack of solid groundwork makes it difficult to design effective intervention strategies to decrease sitting behaviors. Using the Theory of Planned Behavior (TPB as our theoretical lens to better understand factors related with beneficial standing behaviors already being practiced, we examined relationships between TPB constructs and time spent standing at work among “positive deviants” (those successful in behavior change. Experience sampling methodology (ESM, 4 times a day (midmorning, before lunch, afternoon, and before leaving work for 5 consecutive workdays (Monday to Friday, was used to assess employees’ standing time. TPB scales assessing attitude (α = 0.81–0.84, norms (α = 0.83, perceived behavioral control (α = 0.77, and intention (α = 0.78 were developed using recommended methods and collected once on the Friday before the ESM surveys started. ESM data are hierarchically nested, therefore we tested our hypotheses using multilevel structural equation modeling with Mplus. Hourly full-time university employees (n = 50; 70.6% female, 84.3% white, mean age = 44 (SD = 11, 88.2%in full-time staff positions with sedentary occupation types (time at desk while working ≥6 hours/day participated. A total of 871 daily surveys were completed. Only perceived behavioral control (β = 0.45, p < 0.05 was related with work-standing at the event-level (model fit: just fit; mediation through intention was not supported. This is the first study to examine theoretical antecedents of real-time work-standing in a naturalistic field setting among positive deviants. These relationships should be further

  12. MEASUREMENT AND BASIC PHYSICS COMMITTEE OF THE U.S. CROSS-SECTION EVALUATION WORKING GROUP, ANNUAL REPORT 1997

    Energy Technology Data Exchange (ETDEWEB)

    SMITH,D.L.; MCLANE,V.

    1998-10-20

    The Cross-Section Evaluation Working Group (CSEWG) is a long-standing committee charged with responsibility for organizing and overseeing the US cross-section evaluation effort. Its main product is the official US evaluated nuclear data file, ENDF. The current version of this file is Version VI. All evaluations included in ENDF, as well as periodic modifications and updates to the file, are reviewed and approved by CSEWG and issued by the US Nuclear Data Center, Brookhaven National Laboratory. CSEWG is comprised of volunteers from the US nuclear data community who possess expertise in evaluation methodologies and who collectively have been responsible for producing most of the evaluations included in ENDF. In 1992 CSEWG added the Measurements Committee to its list of standing committees and subcommittees. This action was based on a recognition of the importance of experimental data in the evaluation process as well as the realization that measurement activities in the US were declining at an alarming rate and needed considerable encouragement to avoid the loss of this resource. The mission of the Committee is to maintain contact with experimentalists in the US and to encourage them to contribute to the national nuclear data effort. Improved communication and the facilitation of collaborative activities are among the tools employed in achieving this objective. In 1994 the Committee was given an additional mission, namely, to serve as an interface between the applied interests represented in CSEWG and the basic nuclear science community. Accordingly, its name was changed to the Measurement and Basic Physics Committee. The present annual report is the third such document issued by the Committee. It contains voluntary contributions from several laboratories in the US. Their contributions were submitted to the Chairman for compilation and editing.

  13. An Integrated Work Force Planning Strategy For The Health Services 2009 - 2012

    OpenAIRE

    Department of Health and Children

    2009-01-01

    Workforce planning identifies the composition of the workforce required to deliver health service goals. It encompasses a range of human resource activities aimed at the short, medium and long-term. Workforce planning that is integrated with service and financial planning offers the best opportunity for linking human resource decisions to the strategic goals for the health services. Systems and structures are required to support and develop workforce planning activities

  14. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC {section}7901 et seq.) and the U.S. Environmental Protection Agency`s Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts.

  15. Planning and Social Systems: Organizations as a Special Case. A CRUSK-ISR Working Paper.

    Science.gov (United States)

    Crowfoot, James E.

    This paper attempts to provide a broad theoretical framework for understanding planning in organizations and other social systems; and it identifies the key conditions, processes, and structures of social systems in the planning concept. While other frameworks exist that detail singular aspects of planning as it actually occurs and describe…

  16. Work.

    Science.gov (United States)

    Haines, Annette M.

    2003-01-01

    Draws upon Maria Montessori's writings to examine work as a universal human tendency throughout life. Discusses the work of adaptation of the infant, work of "psycho-muscular organism" for the preschooler, work of the imagination for the elementary child, community work of the adolescent, and work of the adult. Asserts that…

  17. Publication planning 101.

    Science.gov (United States)

    Sismondo, Sergio; Nicholson, Scott Howard

    2009-01-01

    Publication planning is the sub-industry to the pharmaceutical industry that does the organizational and practical work of shaping pharmaceutical companies' data and turning it into medical journal articles. Its main purpose is to create and communicate scientific information to support the marketing of products. This report is based mostly on information presented at the 2007 annual meeting of the International Society of Medical Planning Professionals, including a workshop entitled "Publication Planning 101/201", attended by one of us. We provide some analysis of the role of publication planning in medical publishing, and its implications for the structuring of medical knowledge.

  18. The Palau AHEC--academizing the public health work plan: capacity development and innovation in Micronesia.

    Science.gov (United States)

    Dever, Greg; Finau, Sitaleki; Kuartei, Stevenson; Durand, A Mark; Rykken, David; Yano, Victor; Untalan, Pedro; Withy, Kelley; Tellei, Patrick; Baravilala, Wame; Pierantozzi, Sandra; Tellei, Jullie

    2005-03-01

    The Palau Area Health Education Center (AHEC)--a program of the University of Hawaii's John A. Burns School of Medicine (JABSOM) and based at Palau Community College--was established in 2001 in response to the recommendations of the 1998 Institute of Medicine (IOM) report--Pacific Partnerships for Health--Charting a New Course for the 21st Century1. One of IOM's core recommendations was to promote the training of the primary health care workforce among the U.S.-Associated Pacific Islands. Since its inception in 2001, the Palau AHEC has coordinated overall 37 postgraduate and undergraduate courses in General Practice and Public Health taught by the University of Auckland Faculty of Medicine and Health Sciences and the Fiji School of Medicine's School of Public Health and Primary Care (SPH&PC) in Palau, Yap State, and the Republic of the Marshall Islands. Currently 139 physicians, nurses, health administrators, and environmental health workers are registered as active students in Palau (58), Yap State (22), and the RMI (59). Notably, the Palau AHEC and the SPH&PC have worked in an innovative partnership with the Palau Ministry of Health to operationalize the MOH's public health work plan to implement a comprehensive community health survey of all 4,376 households in Palau, interviewing 79% of the total population, to determine Palau's health indicators. To accomplish this, the SPH&PC developed and taught a curriculum for Palau physicians and public health nurses on how to design the survey, gather, and analyze data in order to develop and implement appropriately responsive intervention and treatment programs to address Palau's old and newer morbidities. In early FY2005, two other Micronesian AHECs--the Yap State and Commonwealth of the Northern Mariana Islands AHECs--were funded through JABSOM administered grants which will also address the primary care training needs of Micronesia's remote and isolated health workforce.

  19. Site health and safety plan/work plan for further characterization of waste drums at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Abston, J.P.; Burman, S.N.; Jones, D.L.

    1995-10-01

    The health and safety plan/work plan describes a strategy for characterizing the contents of 172 liquid waste and 33 solid waste drums. It also addresses the control measures that will be taken to (1) prevent or minimize any adverse impact on the environment or personnel safety and health and (2) meet standards that define acceptable management of hazardous and radioactive materials and wastes. When writing this document, the authors considered past experiences, recommendations, and best management practices to minimize possible hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or unplanned releases of hazardous or radioactive materials to air, soil, or surface water.

  20. Operable Unit 7-13/14 in situ thermal desorption treatability study work plan

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, P.; Nickelson, D.; Hyde, R.

    1999-05-01

    This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.

  1. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS).

  2. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

  3. Selected Works in Water Supply, Water Conservation and Water Quality Planning.

    Science.gov (United States)

    1981-05-01

    Reuse of water (unspecified) 3. Flushinb toilet with greywater 4. Reduce amount of water used per shower and/or bath 5. Reduce frequency of showers and/or...government, and has held training seminars on water supply and water conservation planning and on water reuse . A water supply and conservation...Planning 9 Water Reuse 9 Water Demand Forecast and Analysis 9 Drought Management 10 Water Conservation in Water Supply Planning 10 Urban Water Supply 11

  4. Technical Work Plan for: Near Field Environment: Engineered System: Radionuclide Transport Abstraction Model Report

    Energy Technology Data Exchange (ETDEWEB)

    J.D. Schreiber

    2006-12-08

    This technical work plan (TWP) describes work activities to be performed by the Near-Field Environment Team. The objective of the work scope covered by this TWP is to generate Revision 03 of EBS Radionuclide Transport Abstraction, referred to herein as the radionuclide transport abstraction (RTA) report. The RTA report is being revised primarily to address condition reports (CRs), to address issues identified by the Independent Validation Review Team (IVRT), to address the potential impact of transport, aging, and disposal (TAD) canister design on transport models, and to ensure integration with other models that are closely associated with the RTA report and being developed or revised in other analysis/model reports in response to IVRT comments. The RTA report will be developed in accordance with the most current version of LP-SIII.10Q-BSC and will reflect current administrative procedures (LP-3.15Q-BSC, ''Managing Technical Product Inputs''; LP-SIII.2Q-BSC, ''Qualification of Unqualified Data''; etc.), and will develop related Document Input Reference System (DIRS) reports and data qualifications as applicable in accordance with prevailing procedures. The RTA report consists of three models: the engineered barrier system (EBS) flow model, the EBS transport model, and the EBS-unsaturated zone (UZ) interface model. The flux-splitting submodel in the EBS flow model will change, so the EBS flow model will be validated again. The EBS transport model and validation of the model will be substantially revised in Revision 03 of the RTA report, which is the main subject of this TWP. The EBS-UZ interface model may be changed in Revision 03 of the RTA report due to changes in the conceptualization of the UZ transport abstraction model (a particle tracker transport model based on the discrete fracture transfer function will be used instead of the dual-continuum transport model previously used). Validation of the EBS-UZ interface model

  5. Planning sentences while doing other things at the same time: effects of concurrent verbal and visuospatial working memory load.

    Science.gov (United States)

    Klaus, Jana; Mädebach, Andreas; Oppermann, Frank; Jescheniak, Jörg D

    2017-04-01

    This study investigated to what extent advance planning during sentence production is affected by a concurrent cognitive load. In two picture-word interference experiments in which participants produced subject-verb-object sentences while ignoring auditory distractor words, we assessed advance planning at a phonological (lexeme) and at an abstract-lexical (lemma) level under visuospatial or verbal working memory (WM) load. At the phonological level, subject and object nouns were found to be activated before speech onset with concurrent visuospatial WM load, but only subject nouns were found to be activated with concurrent verbal WM load, indicating a reduced planning scope as a function of type of WM load (Experiment 1). By contrast, at the abstract-lexical level, subject and object nouns were found to be activated regardless of type of concurrent load (Experiment 2). In both experiments, sentence planning had a more detrimental effect on concurrent verbal WM task performance than on concurrent visuospatial WM task performance. Overall, our results suggest that advance planning at the phonological level is more affected by a concurrently performed verbal WM task than advance planning at the abstract-lexical level. Also, they indicate an overlap of resources allocated to phonological planning in speech production and verbal WM.

  6. IGE Evaluation: Perspectives and a Plan. Working Paper No. 183. Report.

    Science.gov (United States)

    Romberg, Thomas A.

    This paper outlines a plan to assess the effectiveness of individually guided education (IGE) in American elementary schools. The evaluation plan is based on a framework that identifies variables and relationships among variables in four categories: IGE support system components, pupil and staff background, means of instruction, and pupil and…

  7. Planning, Management and Evaluation: Realizing PIC Potential. Private Industry Council Guide. Working Draft.

    Science.gov (United States)

    National Alliance of Business, Inc., Washington, DC.

    This Planning, Management, and Evaluation (PME) guide was developed by the National Alliance of Business as part of its program of management assistance for Private Industry Councils (PICs). The guide is a tool which PICs can use to improve their capability to plan, manage, and evaluate the programs which they administer, and to establish locally…

  8. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    ROGERS, P.M.

    2000-06-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  9. Work Plan for: "Investigation of Noise, Durability, Permeability and Friction Performance Trends for Asphaltic Pavement Surface Types," PPRC Strategic Plan Item 4.16

    OpenAIRE

    Harvey, John T

    2005-01-01

    The central purpose of this research is to support the Caltrans Quiet Pavement Pilot Program. The research conforms with FHWA guidance provided to State DOTs that conduct tire/pavement noise research. The broader purpose of this research is to support the Caltrans Quieter Pavements Road Map and Work Plan, with goals and objectives that address quiet as well as permeable asphalt surfaces for pavements. Results from this research will identify best practice for selecting asphaltic surf...

  10. Aespoe Hard Rock Laboratory. Planning Report for 2010

    Energy Technology Data Exchange (ETDEWEB)

    2010-05-15

    This report presents the planned activities for the year 2010. The report is revised annually and details the programme carried out in the Aespoe Hard Rock Laboratory as described in SKB's Research, Development and Demonstration Programme 2007, and serves as a basis for the management of the laboratory. The role of the Planning Report is to present the plans and scope of work for each project. Thereby the Status Reports may concentrate on work in progress and refers to this Planning Report for scope of work over the year. Background information on the projects is given in the Annual Report as well as findings and results

  11. Aespoe Hard Rock Laboratory. Planning Report for 2009

    Energy Technology Data Exchange (ETDEWEB)

    2009-02-15

    This report presents the planned activities for the year 2009. The report is revised annually and details the programme carried out in the Aespoe Hard Rock Laboratory as described in SKB's Research, Development and Demonstration Programme 2007, and serves as a basis for the management of the laboratory. The role of the Planning Report is to present the plans and scope of work for each project. Thereby the Status Reports may concentrate on work in progress and refers to this Planning Report for scope of work over the year. Background information on the projects is given in the Annual Report as well as findings and results.

  12. Working together on automated vehicle guidance AVG : preliminary business plan, abridged version.

    NARCIS (Netherlands)

    Awareness (ed.)

    1998-01-01

    This plan describes the questions which will have to be answered in the short term, and the action which need to be taken in a phased and structured manner to gain insight into the potential of automated vehicle guidance (AVG).

  13. The association between psychosocial work environment, attitudes towards older workers (ageism) and planned retirement

    DEFF Research Database (Denmark)

    Thorsen, Sannie; Rugulies, Reiner; Løngaard, Katja

    2012-01-01

    The aim of this study was to examine the association between psychosocial factors (in particular ageism) at the workplace and older workers' retirement plans, while taking health and workability of the employee into account.......The aim of this study was to examine the association between psychosocial factors (in particular ageism) at the workplace and older workers' retirement plans, while taking health and workability of the employee into account....

  14. Analysing Individual Income Tax Planning in Colleges and Universities---Based on the Normal Wage Income and Annual Salary of One-time Bonus Tax

    Institute of Scientific and Technical Information of China (English)

    LI Xiao-hua

    2013-01-01

    Paying personal income tax is related to the vital interests of each faculty. In order to improve the faculty’s enthusiasm for work, it's very essential to make a plan for paying personal income tax.Based on the method of paying personal income tax, this essay gives a strategic analysis of tax planning with a combination of the university faculty’s actual salary situation.

  15. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    Energy Technology Data Exchange (ETDEWEB)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baseline and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.

  16. [Gerontosocial work in the context of Russian culture and recommendations of Madrid International Plan of Action on Ageing].

    Science.gov (United States)

    Danilova, R I; Golubeva, E Iu

    2007-01-01

    The definition of gerontosocial work adopted in the majority of the European countries in the context of the Russian culture and priority trends of the Madrid International Plan of Action on Ageing has been discussed. In the article the interaction and differences between terms being used in social work with the elderly people in Russia have been showed; tasks and peculiarities of gerontosocial work have been defined. Peculiarities of interaction between personnel and elderly patients have been studied; the increasing requirements to the professionalism of gerontosocial workers have been proved.

  17. Integrated Program of Experimental Diagnostics at the NNSS. An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2010-09-01

    This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories’ (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3-year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

  18. Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002)

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

    2002-01-25

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation

  19. The career intentions, work-life balance and retirement plans of dental undergraduates at the University of Bristol.

    Science.gov (United States)

    Puryer, J; Patel, A

    2016-02-26

    Aim To investigate the career intentions, work-life balance and retirement plans of dental undergraduates at the University of Bristol in 2015.Method Cross-sectional survey of 210 clinical undergraduates using an anonymous self-report questionnaire.Results The response rate was 79%. The majority (81.7%) were 'satisfied' or 'extremely satisfied' with their choice of career. The majority (78.7%) felt men and women are equally likely to succeed in dentistry, although 42.9% felt men had an advantage over women with regards to career success. The majority (81.6%) intend on working within general practice, 11.3% within hospital dental services and 2.1% within community dental services. The majority (70.5%) intend to specialise within dentistry. Only 1.8% of participants intend on providing only National Health Service (NHS) dental treatment whereas the 86.5% would provide both NHS and private dental treatment. Fifteen years after qualifying, 52.2% plan to work part-time, and 37.8% intend on retiring at the age of 60 or below. The majority (86.6%) felt that childcare should be shared equally between both parents. Female students intend to take more time out of their career to concentrate on childcare and felt that having a child would affect their career more than males.Conclusion The anticipated career plans, work-life balance and retirement plans of undergraduates change over time, and further research should be carried out to monitor future career intentions of dental students in order to help with dental workforce planning.

  20. 77 FR 64311 - Potential Market Impact of the Proposed Fiscal Year 2014 Annual Materials Plan; National Defense...

    Science.gov (United States)

    2012-10-19

    ... Security, Office of Strategic Industries and Economic Security, 1401 Constitution Avenue NW., Room 3876... Economic Security, Bureau of Industry and Security, U.S. ] Department of Commerce, Telephone: (202) 482... Bureau of Industry and Security Potential Market Impact of the Proposed Fiscal Year 2014 Annual...

  1. Nagra annual report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Ammann, M. (ed.)

    2008-07-01

    This annual report issued by the Swiss National Cooperative for the Disposal of Radioactive Waste reviews the co-operative's activities in the year 2007 and presents an overview of developments in energy policy, planning procedures and funding plans. The selection of sites for the disposal of radioactive wastes in Switzerland is discussed. Various technical questions are briefly addressed and work being carried out in the rock laboratories in the Swiss Alps and Jura mountains is discussed. International co-operation is reviewed and public relations issues are discussed. Finally, organisational structures are described and the financial details for the year 2007 are presented. The report is completed with an appendix containing the co-operative's organigram, waste inventories and listings of publications, addresses and a short glossary.

  2. Nagra annual report 2008

    Energy Technology Data Exchange (ETDEWEB)

    Ammann, M. (ed.)

    2009-07-01

    This annual report issued by the Swiss National Co-operative for the Disposal of Radioactive Waste, Nagra, reviews the co-operative's activities in the year 2008 and presents an overview of developments in energy policy, planning procedures and funding plans. Energy policy and the selection of sites for the disposal of radioactive wastes in Switzerland are discussed. Various technical questions are briefly addressed and work being carried out in the rock laboratories in the Swiss Alps and Jura mountains is discussed. International co-operation is reviewed and public relations issues are discussed. Finally, organisational structures are described and Nagra's financial details for the year 2008 are presented and discussed. The report is completed with an appendix containing the co-operative's organigram, waste inventories and listings of publications, addresses and a short glossary.

  3. Walking the Torque: Proposed Work Plan for Energy-Efficiency Policy Opportunities for Electric Motor-Driven Systems

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Electric motor-driven system is the largest single energy end use accounting for more than 40% of global electricity consumption. This paper sets out an ambitious but achievable target with the global work plan to improve the energy efficiency of electric motor-driven system by 10% to 15% based on the finding of working paper ''Energy-Efficiency Policy Opportunities for Electric Motor-Driven Systems (Waide et al., 2011)''. If governments commit to the proposed work plan immediately and maintain resourcing levels, this could be achieved by 2030 and it would be equivalent to reducing total global electricity use by around 5%. The proposed work plan of this paper is to align regulatory settings within a globally applicable scheme. The IEA believes this target can only be achieved through global co-operation leading to aligned national policy settings that countries can unlock the economies of scale that will result from using more energy efficient EMDS.

  4. Where 'Ignoring Delete Lists' Works: Local Search Topology in Planning Benchmarks

    CERN Document Server

    Hoffmann, J

    2011-01-01

    Between 1998 and 2004, the planning community has seen vast progress in terms of the sizes of benchmark examples that domain-independent planners can tackle successfully. The key technique behind this progress is the use of heuristic functions based on relaxing the planning task at hand, where the relaxation is to assume that all delete lists are empty. The unprecedented success of such methods, in many commonly used benchmark examples, calls for an understanding of what classes of domains these methods are well suited for. In the investigation at hand, we derive a formal background to such an understanding. We perform a case study covering a range of 30 commonly used STRIPS and ADL benchmark domains, including all examples used in the first four international planning competitions. We *prove* connections between domain structure and local search topology -- heuristic cost surface properties -- under an idealized version of the heuristic functions used in modern planners. The idealized heuristic function is c...

  5. Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

    Science.gov (United States)

    Drummond, Mark; Fox, Mark; Tate, Austin; Zweben, Monte

    1992-01-01

    The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

  6. Inventory and Monitoring (I&M) Initiative FY 2012 Annual Report and FY 2013 Work Plan Regional Appendices

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — These are the regional detailed summaries that step-down from the I results from all eight regions and the I&M Branch of the Natural Resource Program Center have...

  7. Inventory and Monitoring (I&M) Initiative FY 2013 Annual Report and FY 2014 Work Plan Regional Appendices

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — These regional appendices describes implementation of the National Wildlife Refuge System's I results from all eight regions and the I&M Branch of the Natural...

  8. Liquid effluents 1994 fiscal year work plan: WBS 1.2.2.1

    Energy Technology Data Exchange (ETDEWEB)

    Ashworth, F.L. Jr.

    1993-08-01

    The program mission is to manage current and future liquid effluent streams in a safe, responsible, cost effective and legally compliant manner. This is achieved through planning and integration, public and stakeholder interaction, definition of requirements for generators and provision of timely treatment, storage, disposal capability, and waste minimization of waste streams where applicable.

  9. Promoting and Expanding Apprenticeship: A Strategic Plan for Preparing America's Work Force of Tomorrow (Phase I).

    Science.gov (United States)

    Employment and Training Administration (DOL), Washington, DC. Office of Work-Based Learning.

    A strategic plan to strengthen and expand the nation's existing apprenticeship system contains three components: apprenticeship promotion and marketing, national registration and tracking system, and quality. Efforts to promote apprenticeship must involve a two-pronged strategy that seeks both to develop new programs and expose potential program…

  10. Developing strategic marketing plans that really work a toolkit for public libraries

    CERN Document Server

    Kendrick, Terry

    2006-01-01

    Many government and other reports stress the need to get public libraries back into the lives of potential users, and this requires significant marketing effort on the part of the libraries. This book de-mystifies the marketing planning process and sets it in the context of modern public library services.

  11. Announcement from the General Office of the State Council about Issuing the "2009 Work Plan for Energy Saving and Emission Reduction"

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    @@ The announcement from General Office of the State Council about Issuing the "2009 Work Plan for Energy Saving and Emission Reduction" on July 19, 2009, requested that governments in all provinces, autonomous regions and municipalities, ministries and commissions under the State Council, departments directly under the State Council must strictly implement the work plan.

  12. 21st Century jobs initiative - building the foundations for a 21st Century economy. Appendix A, cluster working group initiative business plans

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The business and community leaders who participated in a four-month long series of working groups developed business plans for initiatives which would lead to further growth and competitiveness of each of the industrial clusters. This appendix contains those business plans as they stood at the end of the working group session mid-September, 1995.

  13. The space shuttle payload planning working groups. Volume 10: Space technology

    Science.gov (United States)

    1973-01-01

    The findings and recommendations of the Space Technology group of the space shuttle payload planning activity are presented. The elements of the space technology program are: (1) long duration exposure facility, (2) advanced technology laboratory, (3) physics and chemistry laboratory, (4) contamination experiments, and (5) laser information/data transmission technology. The space technology mission model is presented in tabular form. The proposed experiments to be conducted by each test facility are described. Recommended approaches for user community interfacing are included.

  14. Teachers' Perceptions of Their Working Conditions: How Predictive of Planned and Actual Teacher Movement?

    Science.gov (United States)

    Ladd, Helen F.

    2011-01-01

    This quantitative study examines the relationship between teachers' perceptions of their working conditions and their intended and actual departures from schools. Based on rich administrative data for North Carolina combined with a 2006 statewide survey administered to all teachers in the state, the study documents that working conditions are…

  15. Informal work and formal plans: articulating the active role of patients in cancer trajectories

    DEFF Research Database (Denmark)

    Dalsted, Rikke Juul; Hølge-Hazelton, Bibi; Brostrøm Kousgaard, Marius;

    2012-01-01

    and care. They initiated processes in the trajectories, and acquired information, which they used to form their trajectories. Patients presented problems to the healthcare professionals in order to get proper help when needed. Discussion: Work done by patients was invisible and not perceived as work...

  16. Preservice and Inservice Teachers' Challenges in the Planning of Practical Work in Physics

    Science.gov (United States)

    Nivalainen, Ville; Asikainen, Mervi A.; Sormunen, Kari; Hirvonen, Pekka E.

    2010-01-01

    Practical work in school science plays many essential roles that have been discussed in the literature. However, less attention has been paid to how teachers learn the different roles of practical work and to the kind of challenges they face in their learning during laboratory courses designed for teachers. In the present study we applied the…

  17. Working Alliance in Patients with Severe Mental Illness Who Need a Crisis Intervention Plan

    NARCIS (Netherlands)

    A. Ruchlewska (Asia); A.M. Kamperman (Astrid); M. van der Gaag (Mark); A.I. Wierdsma (André); C.L. Mulder (Niels)

    2016-01-01

    textabstractWorking alliance has been characterized as an important predictor of positive treatment outcomes. We examined whether illness insight, psychosocial functioning, social support and locus of control were associated with working alliance as perceived by both patient and clinician. We assess

  18. Can Planning Time Compensate for Individual Differences in Working Memory Capacity?

    Science.gov (United States)

    Nielson, Katharine B.

    2014-01-01

    Language learners with high working memory capacity have an advantage, all other factors being equal, during the second language acquisition (SLA) process; therefore, identifying a pedagogical intervention that can compensate for low working memory capacity would be advantageous to language learners and instructors. Extensive research on the…

  19. Annual Trapping Proposal 1985

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Trapping Plan for the 1984-1985 trapping season at Clarence Cannon NWR outlines rules and regulations for the trapping of beaver and muskrat on the...

  20. 2010 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-01-01

    This annual report includes: an overview of Western; approaches for future hydropower and transmission service; major achievements in FY 2010; FY 2010 customer Integrated Resource Planning, or IRP, survey; and financial data.

  1. Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts.

  2. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

  3. Engineering task plan for the annual revision of the rotary mode core sampling system safety equipment list

    Energy Technology Data Exchange (ETDEWEB)

    BOGER, R.M.

    1999-05-13

    This Engineering Task Plan addresses an effort to provide an update to the RMCS Systems 3 and 4 SEL and DCM in order to incorporate the changes to the authorization basis implemented by HNF-SD-WM-BIO-001, Rev. 0 (Draft), Addendum 5 , Safety Analysis for Rotary Mode Core Sampling. Responsibilities, task description, cost estimate, and schedule are presented.

  4. Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

  5. Maximizing engagement in the American Psychological Association and its affiliated professional associations: 2012 annual report of the Policy and Planning Board.

    Science.gov (United States)

    2013-01-01

    APA Bylaws Article XI.7 requires that the Policy and Planning Board report annually by publication to the membership and review the structure and function of the Association as a whole every fifth year. This report offers a framework for how to strategically and systematically provide a range of high-value engagement opportunities across membership cohorts and activities. The first section provides a selected overview of literature related to engagement and offers some general considerations for incorporating research into evaluating and refining member engagement activities. Next, survey findings on why individuals join membership organizations are reviewed. Finally, 10 engagement domains as a framework for designing, evaluating, and monitoring the impact of engagement initiatives and activities are presented.

  6. Fiscal Year 2014 United States Army Corps of Engineers -Civil Works Annual Financial Report: Maintaining Readiness Through Fiscal Responsibility

    Science.gov (United States)

    2014-01-01

    Compensation Act benefits. The Department of the Army (DA) actuarial liability for workers’ compensation benefits is developed by the Department of...Works) 3 Message from the USACE Chief Financial Officer 5 Management’s Discussion and Analysis 7 Civil Works Program Principal Financial Statements...and responsive development and management of the Nation’s water resources; (2) protect, restore, and manage the aquatic environment; and (3) provide

  7. Role of conservation in planning for an energy emergency: home and work-place energy use

    Energy Technology Data Exchange (ETDEWEB)

    Carlsmith, R S

    1980-06-01

    Prospects for making substantial reductions in energy consumption in the residential, commercial, and industrial sectors are discussed. Steps to deal with an emergency and with preparations that can be started now to reduce our vulnerability are described. A large amount of energy conservation has occurred since 1973. As a result, 1980 consumption will be about 83 EJ instead of 104 EJ. Much of this energy conservation has come about from increased efficiency, as indicated by the fact that the energy/GNP ratio has dropped from 64 MJ/1972 dollar in 1973 to 58 MJ/1972 dollar in 1979. Higher energy prices have been and will continue to be the principal driving force for conservation. However, there are a number of serious barriers. Because of these barriers Congress has promulgated a program of encouraging conservation through regulations, financial measures, and information programs. Some of the most important are energy performance standards for new buildings, assistance in retrofitting residential buildings, and grants for institutional buildings. The planning for emergency situations remains incomplete. Proposed emergency measures (with the exception of gasoline rationing) focus largely on reduction of nonessential uses of energy. The potential reductions achievable by such measures would fall far short of the requirements in a serious emergency such as a cutoff of all imports from the mid-east. There remains an urgent need for detailed planning of allocation, distribution, pricing, and enforcement procedures for a major emergency.

  8. Waste management plan for pipeline construction works: basic guideline for its preparation

    Energy Technology Data Exchange (ETDEWEB)

    Serricchio, Claudio; Caldas, Flaviana V. [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Souza, Izabel C.A. de; Araujo, Ronaldo G. de [TELSAN, Rio de Janeiro, RJ (Brazil); Souza, Tania Mara [IMC-SASTE, Sao Paulo,SP (Brazil); Veronez, Fernanda A. [Bourscheid, Porto Alegre, RS (Brazil)

    2009-07-01

    During the stage of implementation of the land pipes enterprise, one of the main environmental aspects to be considered was the creation of solid and liquid waste. To mitigate the possible impacts to the environment, the main adopted mitigate measure was the implementation of a Waste Management Plan - WMP. Thus, the management of waste from pipes construction has the challenge of a great variety of stages and phases for the implementation of pipes and the diversity of local situations related to the topographic and hydro-geologic conditions. Considering the peculiarity of the pipes activities, this article proposes the elaboration of a Basic Guide to be used as reference for the creation of WMP's for similar enterprises, using as foundation the data from the three Gas Pipelines: Cabiunas - Vitoria; Vitoria - Cacimbas and Cacimbas - Catu. After the analysis of the three mentioned enterprises, it was verified that the waste management generated on the building and assembling of the land pipes normally occurs in accord with previous planning, but there's no systematization for the waste to be better recycled and reutilized, thus mitigating their creation. (author)

  9. Virtual reality based support system for layout planning and programming of an industrial robotic work cell.

    Science.gov (United States)

    Yap, Hwa Jen; Taha, Zahari; Dawal, Siti Zawiah Md; Chang, Siow-Wee

    2014-01-01

    Traditional robotic work cell design and programming are considered inefficient and outdated in current industrial and market demands. In this research, virtual reality (VR) technology is used to improve human-robot interface, whereby complicated commands or programming knowledge is not required. The proposed solution, known as VR-based Programming of a Robotic Work Cell (VR-Rocell), consists of two sub-programmes, which are VR-Robotic Work Cell Layout (VR-RoWL) and VR-based Robot Teaching System (VR-RoT). VR-RoWL is developed to assign the layout design for an industrial robotic work cell, whereby VR-RoT is developed to overcome safety issues and lack of trained personnel in robot programming. Simple and user-friendly interfaces are designed for inexperienced users to generate robot commands without damaging the robot or interrupting the production line. The user is able to attempt numerous times to attain an optimum solution. A case study is conducted in the Robotics Laboratory to assemble an electronics casing and it is found that the output models are compatible with commercial software without loss of information. Furthermore, the generated KUKA commands are workable when loaded into a commercial simulator. The operation of the actual robotic work cell shows that the errors may be due to the dynamics of the KUKA robot rather than the accuracy of the generated programme. Therefore, it is concluded that the virtual reality based solution approach can be implemented in an industrial robotic work cell.

  10. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  11. Pluri annual indicative plan of the investments in the gas sector; Plan indicatif pluriannuel des investissements dans le secteur du gaz Periode 2006-2015

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-03-15

    This indicative plan constitutes the first report to the Parliament. It is a prospective document for the period 2006-2015 containing: a forecast of the gas demand increase, a description of main investments decided in matter of gas infrastructures, a diagnostic concerning the adequation between the supplying capacities in natural gas and the national needs, a series of recommendations on the State tools to guarantee the national supplying security and on the investment. The four parts deal with the stakes and perspectives of the national natural gas supplying, the demand evolution, the offer evolution and the equilibrium offer. (A.L.B.)

  12. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    Energy Technology Data Exchange (ETDEWEB)

    L. O. Nelson

    2003-09-01

    This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

  13. Summary of some Recent Work on Financial Planning for Decommissioning of Nuclear Research Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lindskog, Staffan (Swedish Nuclear Power Inspectorate, Stockholm (Sweden)); Sjoeblom, Rolf (Tekedo AB, Nykoeping (Sweden))

    2008-06-15

    The new European Union Environmental Liability Directive (ELD) together with the new standard and the increased awareness of the implications of the statements on Environmental liabilities in the IFRS/IA high-light the need for appropriate planning for decommissioning including cost estimations and waste fund management. These new regulations and standards are in some respects more stringent than the strictly nuclear rules. Consequently, The Swedish Nuclear Power Inspectorate has sought communication with non-nuclear actors in the area, including the participation in the recent meeting Environmental Economics and Investment Assessment 11, 27-30 May, 2008, Cadiz, Spain. The present compilation of publications on decommissioning and associated cost calculations in Sweden was prompted by these contacts. The compilation comprises 14 reports published during the last four years

  14. The evidence base for oxygen for chronic refractory breathlessness: issues, gaps, and a future work plan.

    Science.gov (United States)

    Johnson, Miriam J; Abernethy, Amy P; Currow, David C

    2013-04-01

    Breathlessness or "shortness of breath," medically termed dyspnea, is a common and distressing symptom featuring strongly in advanced lung, cardiac, and neuromuscular diseases; its prevalence and intensity increase as death approaches. However, despite the increasing understanding in the genesis of breathlessness, as well as an increasing portfolio of treatment options, breathlessness is still difficult to manage and engenders helplessness in caregivers and health care professionals and fear for patients. Although hypoxemia does not appear to be the dominant driver for breathlessness in advanced disease, the belief that oxygen is important for the relief of acute, chronic, and acute-on-chronic shortness of breath is firmly embedded in the minds of patients, caregivers, and health care professionals. This article presents current understanding of the use of oxygen for treating refractory breathlessness in advanced disease. The objective is to highlight what is still unknown, set a research agenda to resolve these questions, and highlight methodological issues for consideration in planned studies.

  15. Gaps in the evidence base of opioids for refractory breathlessness. A future work plan?

    Science.gov (United States)

    Johnson, Miriam J; Abernethy, Amy P; Currow, David C

    2012-03-01

    Breathlessness or "shortness of breath," medically termed dyspnea, remains a devastating problem for many people and those who care for them. As a treatment intervention, administration of opioids to relieve breathlessness is an area where progress has been made with the development of an evidence base. As evidence in support of opioids has accumulated, so has our collective understanding about trial methodology, research collaboration, and infrastructure that is crucial to generate reliable research results for palliative care clinical settings. Analysis of achievements to date and what it takes to accomplish these studies provides important insights into knowledge gaps needing further research and practical insight into design of pharmacological and nonpharmacological intervention trials in breathlessness and palliative care. This article presents the current understanding of opioids for treating breathlessness, what is still unknown as priorities for future research, and highlights methodological issues for consideration in planned studies.

  16. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  17. Perspective: The missing link in academic career planning and development: pursuit of meaningful and aligned work.

    Science.gov (United States)

    Lieff, Susan J

    2009-10-01

    Retention of faculty in academic medicine is a growing challenge. It has been suggested that inattention to the humanistic values of the faculty is contributing to this problem. Professional development should consider faculty members' search for meaning, purpose, and professional fulfillment and should support the development of an ability to reflect on these issues. Ensuring the alignment of academic physicians' inner direction with their outer context is critical to professional fulfillment and effectiveness. Personal reflection on the synergy of one's strengths, passions, and values can help faculty members define meaningful work so as to enable clearer career decision making. The premise of this article is that an awareness of and the pursuit of meaningful work and its alignment with the academic context are important considerations in the professional fulfillment and retention of academic faculty. A conceptual framework for understanding meaningful work and alignment and ways in which that framework can be applied and taught in development programs are presented and discussed.

  18. Making Investments in Dryland Development Work: Participatory Scenario Planning in the Makanya Catchment, Tanzania

    Directory of Open Access Journals (Sweden)

    Elin I. Enfors

    2008-12-01

    Full Text Available The agro-ecosystems of semi-arid and dry sub-humid SSA are inherently dynamic. At this point in time they are also experiencing a series of complex social-ecological changes that make their future even more uncertain. To ensure that development investments made today in the small-scale farming systems that dominate these regions make sense also in a long-term perspective they should benefit the local communities over a range of potential futures. We applied a participatory scenario planning approach to a smallholder farming community in semi-arid Tanzania, exploring four alternative development trajectories for the area, to increase the robustness of current investments in small-scale water system technologies. We found that water system technologies will be important across a number of possible futures, but that the most relevant target of these innovations, e.g., staple- versus cash-crop production, or individual- versus community-managed systems, differs. We argue that building capacity for experimentation among farmers is key to upgrading their farming systems, as this will generate benefits over a range of alternative futures. Furthermore, we found it to be essential across a range of scenarios to analyze the system-level impact of proposed interventions for successful investments in water system technologies. We conclude that although the method presents some challenges, participatory scenario planning is a useful tool for integrating research and development projects in the larger context, asit increases the understanding of events and processes that may either challenge the project or provide opportunities for it.

  19. Working Together to Make a Difference in Rural America: North Central Regional Center for Rural Development, 2010 Annual Report

    Science.gov (United States)

    North Central Regional Center for Rural Development, 2011

    2011-01-01

    The North Central Regional Center for Rural Development (NCRCRD) is one of four regional centers in the United States that have worked to improve the quality of life in rural communities for nearly 40 years. With funding from the USDA National Institute of Food and Agriculture and the land-grant universities in our 12-state region, the NCRCRD…

  20. Comparison of Cognitive Change after Working Memory Training and Logic and Planning Training in Healthy Older Adults.

    Science.gov (United States)

    Goghari, Vina M; Lawlor-Savage, Linette

    2017-01-01

    Recent attention has focused on the benefits of cognitive training in healthy adults. Many commercial cognitive training programs are available given the attraction of not only bettering one's cognitive capacity, but also potentially preventing age-related declines, which is of particular interest to older adults. The issue of whether cognitive training can improve performance within cognitive domains not trained (i.e., far transfer) is controversial, with meta-analyses of cognitive training both supporting and falsifying this claim. More support is present for the near transfer (i.e., transfer in cognitive domain trained) of cognitive training; however, not in all studies. To date, no studies have compared working memory training to training higher-level processes themselves, namely logic and planning. We studied 97 healthy older adults above the age of 65. Healthy older adults completed either an 8-week web-based cognitive training program on working memory or logic and planning. An additional no-training control group completed two assessments 8-weeks apart. Participants were assessed on cognitive measures of near and far transfer, including working memory, planning, reasoning, processing speed, verbal fluency, cognitive flexibility, and creativity. Participants improved on the trained tasks from the first day to last day of training. Bayesian analyses demonstrated no near or far transfer effects after cognitive training. These results support the conclusion that performance-adaptive computerized cognitive training may not enhance cognition in healthy older adults. Our lack of findings could be due to a variety of reasons, including studying a cohort of healthy older adults that were performing near their cognitive ceiling, employing a training protocol that was not sufficient to produce a change, or that no true findings exist. Research suggests numerous study factors that can moderate the results. In addition, the role of psychological variables, such as

  1. Final work plan : indoor air and ambient air sampling near the former CCC/USDA grain storage facility in Everest, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M. (Environmental Science Division)

    2010-05-24

    The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at the western edge of Everest, Kansas, from the early 1950s to the early 1970s. Sampling by the Kansas Department of Health and Environment (KDHE) in 1997 resulted in the detection of carbon tetrachloride in one domestic well (the Nigh well) northwest of the former facility. On behalf of the CCC/USDA, Argonne National Laboratory subsequently conducted a series of investigations to characterize the contamination (Argonne 2003, 2006a,b,c). Automatic, continuous monitoring of groundwater levels began in 2002 and is ongoing at six locations. The results have consistently indicated groundwater flow toward the north-northwest from the former CCC/USDA property to the Nigh property, then west-southwest from the Nigh property to the intermittent creek. Sitewide periodic groundwater and surface water sampling with analysis for volatile organic compounds (VOCs) began in 2008. Argonne's combined data indicate no significant downgradient extension of contamination since 2000. At present, the sampling is annual, as approved by the KDHE (2009) in response to a plan developed for the CCC/USDA (Argonne 2009). This document presents a plan for collecting indoor air samples in homes located along and adjacent to the defined extent of the carbon tetrachloride contamination. The plan was requested by the KDHE. Ambient air samples to represent the conditions along this pathway will also be taken. The purpose of the proposed work is to satisfy KDHE requirements and to collect additional data for assessing the risk to human health due to the potential upward migration of carbon tetrachloride and its primary degradation product (chloroform) into homes located in close proximity to the former grain storage facility, as well as along and within 100 ft laterally from the currently defined plume emanating from the former Everest facility. Investigation of the indoor air

  2. The Power to Persuade: A Working Paper in the Micropolitics of Educational Planning.

    Science.gov (United States)

    O'Brien, Peter W.

    1987-01-01

    This working paper focuses on the educational planner as a bureaucratic actor. To explain planner influence or lack of influence in the policymaking process, practitioners need to explore the micropolitics of organizations and understand individual, organizational, and situational forces demanding their engagement. Planners need an engaged…

  3. Translated and annotated version of the 2015-2020 National Mental Health Work Plan of the People's Republic of China.

    Science.gov (United States)

    Xiong, Wei; Phillips, Michael R

    2016-02-25

    The following document is a translation of the 2015-2020 National Mental Health Work Plan of the People's Republic of China which was issued by the General Office of China's State Council on June 4, 2015. The original Chinese version of the document is available at the official government website: http://www.gov.cn/gongbao/content/2015/content_2883226.htm The translators have added annotations at the end of the document that provide background information to help contextualize content that may be unclear to readers unfamiliar with China and explain their decisions when translating terms that can have multiple interpretations.

  4. Proceedings of the 22nd Annual DoD/DOE Seismic Research Symposium: Planning for Verification of and Compliance with the Comprehensive Nuclear-Test-Ban Treaty (CTBT)

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, James W., LTC [Editor

    2000-09-15

    These proceedings contain papers prepared for the 22nd Annual DoD/DOE Seismic Research Symposium: Planning for Verification of and Compliance with the Comprehensive Nuclear-Test-Ban Treaty (CTBT), held 13-15 September 2000 in New Orleans, Louisiana. These papers represent the combined research related to ground-based nuclear explosion monitoring funded by the National Nuclear Security Administration (NNSA), Defense Threat Reduction Agency (DTRA), Air Force Technical Applications Center (AFTAC), Department of Defense (DoD), US Army Space and Missile Defense Command, Defense Special Weapons Agency (DSWA), and other invited sponsors. The scientific objectives of the research are to improve the United States capability to detect, locate, and identify nuclear explosions. The purpose of the meeting is to provide the sponsoring agencies, as well as potential users, an opportunity to review research accomplished during the preceding year and to discuss areas of investigation for the coming year. For the researchers, it provides a forum for the exchange of scientific information toward achieving program goals, and an opportunity to discuss results and future plans. Paper topics include: seismic regionalization and calibration; detection and location of sources; wave propagation from source to receiver; the nature of seismic sources, including mining practices; hydroacoustic, infrasound, and radionuclide methods; on-site inspection; and data processing.

  5. The Impact of Population Information: Implications for the 1980's. Proceedings of the Annual Conference, Association for Population/Family Planning Libraries and Information Centers--International (12th, Philadelphia, Pennsylvania, April 23-26, 1979).

    Science.gov (United States)

    Helde, Joan P., Ed.; Stanley, Janet, Ed.

    Papers, workshop sessions, and official business of the Association for Population/Family Planning Libraries and Information Centers (APLIC) are presented in the proceedings of this annual conference. The presidential address by Richard Hankinson is followed by the keynote address, in which Ansley J. Coale discusses Malthus and the population…

  6. SU-E-T-367: Evaluate the Dosimetric Impacts On Patient Specific Treatment Plans Due to Set Up Uncertainties During LINAC Annual QA and Commission

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, V; Wang, B [James Graham Brown Cancer Center, University of Louisville, Louisville, KY (United States); Shi, C [Saint Vincent Medical Center, Bridgeport, CT (United States)

    2015-06-15

    Purpose: To quantify the dosimetric impact on patient’s specific treatment plans due to set up uncertainties during LINAC commission and annual QA and to determine the maximum set up uncertainty allowance range. Methods: A 60×60×60 cm{sup 3} solid water cube was created in Varian Eclipse TPS. Beam data profiles (crossline and diagonal) and PDDs for field sizes ranging from 2×2 cm{sup 2} to 40×40 cm{sup 2} were simulated. Three main uncertainty scenarios were purposely introduced for gantry position tilts (0–5°), source axis distance changes (100–105 cm), and iso-center position shifts (0–5 mm) during the simulation. A gamma analysis was used to compare the correct simulated profiles with the profiles for each scenario. Two static IMRT treatment plans (H&N and GYN) with tumors at 5 cm and 15 cm depths were compared using similar set up uncertainties. Results: A gamma analysis using ±3%/±3mm with 90% passing rate criteria is included to show the passing rate for each scenario. Crossline and diagonal profiles showed a gamma passing rating of ≥ 90% at depth ≤10 cm for these scenarios: gantry tilted from 0–5°, SAD changed from 100–105 cm, and iso-center shifted ≤ 4 mm. From 10 to 20 cm depths, all three scenarios failed with gamma passing ≤ 90% excepted for diagonal profiles at Gantry =2°, SAD =1 cm, and iso-center =1 mm off center. Diagonal profiles showed a higher gamma passing rating compared to crossline profiles for all three scenarios. PDD differences also increased as depth increased. For patient’s specific treatment plans, maximum uncertainties allowed to obtain a ≥90% gamma passing rating are: gantry tilts ±1 degree, SAD shifts ±2 cm, and iso-center moves ±3 mm. Conclusion: This study validated AAPM TG 142 recommendations on the mechanical and dosimetry uncertainties and provided proofs on maximum acceptance tolerances for LINAC annual QA and commission.

  7. New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, L. O.

    2007-06-12

    This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

  8. Expectations and Reality: Why an enterprise software system didn't work as planned

    CERN Document Server

    Greenwood, David

    2011-01-01

    Over two decades, we and other research groups have found that ethnographic and social analyses of work settings can provide insights useful to the process of system analysis and design. Despite this, ethnographic and social analyses have not been widely assimilated into industry practice. Practitioners tend to address sociotechnical factors in an ad-hoc manner, often post-implementation, once system use or outcome has become problematic. In response to this, we have developed a lightweight qualitative approach to provide insights to ameliorate problematic system deployments. Unlike typical ethnographies and social analyses of work activity that inform systems analysis and design; we argue that analysis of intentional and structural factors to inform system deployment and integration can have a shorter time duration and yet can provide actionable insights. We evaluate our approach using a case study of a problematic enterprise document manage-ment system within a multinational systems engineering organization...

  9. A social work plan to promote HIV testing: A social marketing approach.

    Science.gov (United States)

    Morgan-Siebe, J P

    2017-03-01

    Many people living with human immunodeficiency virus (HIV) do not know that they are infected. It is important for infected persons to get tested for HIV in order to be diagnosed and medically treated. HIV has no known cure, but it can be controlled and sometimes prevented with proper medical care. The social work profession has ideal positioning to be extraordinarily helpful in work that promotes HIV testing, leading to reducing then eliminating new HIV diagnoses. Social marketing interventions, along with audience segmenting are explained. Specific attention is given to two separate subjects-minority health disparities and impulsive and/or sensation seeking sex practices-to showcase the versatility of social marketing in the promotion of HIV testing. Further ideas about how social workers can participate in these interprofessional social marketing campaigns are provided.

  10. Higgs Working Group Report of the Snowmass 2013 Community Planning Study

    CERN Document Server

    Dawson, S; Logan, H; Qian, J; Tully, C; Van Kooten, R; Ajaib, A; Anastassov, A; Anderson, I; Bake, O; Barger, V; Barklow, T; Batell, B; Battaglia, M; Berge, S; Blondel, A; Bolognesi, S; Brau, J; Brownson, E; Cahill-Rowley, M; Calancha-Paredes, C; Chen, C -Y; Chou, W; Clare, R; Cline, D; Craig, N; Cranmer, K; de Gruttola, M; Elagin, A; Essig, R; Everett, L; Feng, E; Fujii, K; Gainer, J; Gao, Y; Gogoladze, I; Gori, S; Goncalo, R; Graf, N; Grojean, C; Guindon, S; Han, T; Hanson, G; Harnik, R; Heinemann, B; Heinemeyer, S; Heintz, U; Hewett, J; Ilchenko, Y; Ismail, A; Jain, V; Janot, P; Kawada, S; Kehoe, R; Klute, M; Kotwal, A; Krueger, K; Kukartsev, G; Kumar, K; Kunkle, J; Lewis, I; Li, Y; Linssen, L; Lipeles, E; Lipton, R; Liss, T; List, J; Liu, T; Liu, Z; Low, I; Ma, T; Mackenzie, P; Mellado, B; Melnikov, K; Moortgat-Pick, G; Mourou, G; Narain, M; Nielsen, J; Okada, N; Okawa, H; Olsen, J; Onyisi, P; Parashar, N; Peskin, M; Petriello, F; Plehn, T; Pollard, C; Potter, C; Prokofiev, K; Rauch, M; Rizzo, T; Robens, T; Rodriguez, V; Roloff, P; Ruiz, R; Sanz, V; Sayre, J; Shafi, Q; Shaughnessy, G; Sher, M; Simon, F; Solyak, N; Stupak, J; Su, S; Tanabe, T; Tajima, T; Telnov, V; Tian, J; Thomas, S; Thomson, M; Un, C; Velasco, M; Wagner, C; Wang, S; Whitbeck, A; Yao, W; Yokoya, H; Zenz, S; Zerwas, D; Zhang, Y; Zhou, Y

    2013-01-01

    This report summarizes the work of the Energy Frontier Higgs Boson working group of the 2013 Community Summer Study (Snowmass). We identify the key elements of a precision Higgs physics program and document the physics potential of future experimental facilities as elucidated during the Snowmass study. We study Higgs couplings to gauge boson and fermion pairs, double Higgs production for the Higgs self-coupling, its quantum numbers and $C\\!P$-mixing in Higgs couplings, the Higgs mass and total width, and prospects for direct searches for additional Higgs bosons in extensions of the Standard Model. Our report includes projections of measurement capabilities from detailed studies of the Compact Linear Collider (CLIC), a Gamma-Gamma Collider, the International Linear Collider (ILC), the Large Hadron Collider High-Luminosity Upgrade (HL-LHC), Very Large Hadron Colliders up to 100 TeV (VLHC), a Muon Collider, and a Triple-Large Electron Positron Collider (TLEP).

  11. The City Image and the Local Public Administration: a Working Tool in Urban Planning

    Directory of Open Access Journals (Sweden)

    Marius Cristian NEACȘU

    2009-10-01

    Full Text Available  The goal of this study consist of identifyingand testing in operational terms the concept of cityimage in the decision-making processes, both asfar as the urban planning and the future policies oflocal and regional development are concerned or inthe management of public spaces. It is well-knownthe fact that the simple series of statistical dataand the models based upon them do not sketchout a complete image regarding the urban reality,the perception of habitants at a micro-scale levelabout habituation conditions, illustrated by thecity image, presenting itself as a barometer of thedysfunctionalities encountered in the city. Thus, thepractical implications of this concept based on anew vision in the philosophy of the managementof urban spaces are likely to be interestingenough. Using this tool in the policies and in theactivity of public administration, in urbanism etc.,complementarily to statistical analyses, shouldaccompany any type of local development policyin order to enhance life quality and to transmit acertain life style, well appreciated by the residentswhich should bestow the city distinctiveness anda particular status in the regional and nationalhierarchy. The conceptual scheme of this studyis based on three elements: theory (what doesthe city image represent?, method (how could wemap at a micro-scale level?, case study (whichare the results and the tests of the applicability inthe city of Ploieşti.

  12. Intentions of hospital nurses to work with computers: based on the theory of planned behavior.

    Science.gov (United States)

    Shoham, Snunith; Gonen, Ayala

    2008-01-01

    The purpose of this study was to determine registered nurses' attitudes related to intent to use computers in the hospital setting as a predictor of their future behavior. The study was further aimed at identifying the relationship between these attitudes and selected sociological, professional, and personal factors and to describe a research model integrating these various factors. The study was based on the theory of planned behavior. A random sample of 411 registered nurses was selected from a single large medical center in Israel. The study tool was a Likert-style questionnaire. Nine different indices were used: (1) behavioral intention toward computer use; (2) general attitudes toward computer use; (3) nursing attitudes toward computer use; (4) threat involved in computer use; (5) challenge involved in computer use; (6) organizational climate; (7) departmental climate; (8) attraction to technological innovations/innovativeness; (9) self-efficacy, ability to control behavior. Strong significant positive correlations were found between the nurses' attitudes (general attitudes and nursing attitudes), self-efficacy, innovativeness, and intentions to use computers. Higher correlations were found between departmental climate and attitudes than between organizational climate and attitudes. The threat and challenge that are involved in computer use were shown as important mediating variables to the understanding of the process of predicting attitudes and intentions toward using computers.

  13. Putting PhDs to work: career planning for today's scientist.

    Science.gov (United States)

    Hobin, Jennifer A; Clifford, Philip S; Dunn, Ben M; Rich, Susan; Justement, Louis B

    2014-01-01

    Individual development plans (IDPs) have been promoted nationally as a tool to help research trainees explore career opportunities and set career goals. Despite the interest in IDPs from a policy perspective, there is little information about how they have been used. The authors examined IDP awareness and use, the benefits of creating an IDP, and ways to facilitate its use by administering a survey to current or former postdoctoral researchers via the National Postdoctoral Association (NPA) and University of Alabama at Birmingham email lists; individuals belonging to Federation of American Societies for Experimental Biology member societies who mentored postdocs; and postdoctoral administrators at member institutions of the Association of American Medical Colleges and the NPA. Although most postdoctoral administrators (>80%) were familiar with IDPs, less than 50% of postdocs and only 20% of mentors were aware of IDPs. For those postdocs and mentors who reported creating an IDP, the process helped postdocs to identify the skills and abilities necessary for career success and facilitated communication between postdocs and their mentors. Despite the fact that creating an IDP benefits postdocs and mentors, IDP use will likely remain low unless institutions and research mentors encourage trainees to engage in this process.

  14. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    Energy Technology Data Exchange (ETDEWEB)

    D. Vandel

    2003-09-01

    This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

  15. Interactive production planning and ergonomic assessment with Digital Human Models--introducing the Editor for Manual Work Activities (ema).

    Science.gov (United States)

    Fritzsche, Lars; Leidholdt, Wolfgang; Bauer, Sebastian; Jäckel, Thomas; Moreno, Adrian

    2012-01-01

    The aging workforce is a risk factor for manufacturing industries that contain many jobs with high physical workloads. Thus, ergonomic risk factors have to be avoided in early phases of production planning. This paper introduces a new tool for simulating manual work activities with 3D human models, the so-called emaΦ. For the most part, the emaΦ software is based on a unique modular approach including a number of complex operations that were theoretically developed and empirically validated by means of motion capturing technologies. Using these modules for defining the digital work process enables the production planner to compile human simulations more accurately and much quicker compared to any of the existing modeling tools. Features of the emaΦ software implementation, such as ergonomic evaluation and MTM-time analyses, and the workflow for practical application are presented.

  16. Inhibition, flexibility, working memory and planning in autism spectrum disorders with and without comorbid ADHD-symptoms

    Directory of Open Access Journals (Sweden)

    Schmidt Martin H

    2008-01-01

    Full Text Available Abstract Background Recent studies have not paid a great deal of attention to comorbid attention-deficit/hyperactivity disorder (ADHD symptoms in autistic children even though it is well known that almost half of children with autism spectrum disorder (ASD suffer from hyperactivity, inattention and impulsivity. The goal of this study was to evaluate and compare executive functioning (EF profiles in children with ADHD and in children with ASD with and without comorbid ADHD. Methods Children aged 6 to 18 years old with ADHD (n = 20 or ASD (High-Functioning autism or Asperger syndrome with (n = 20 and without (n = 20 comorbid ADHD and a typically developing group (n = 20 were compared on a battery of EF tasks comprising inhibition, flexibility, working memory and planning tasks. A MANOVA, effect sizes as well as correlations between ADHD-symptomatology and EF performance were calculated. Age- and IQ-corrected z scores were used. Results There was a significant effect for the factor group (F = 1.55; dF = 42; p = .02. Post-hoc analysis revealed significant differences between the ADHD and the TD group on the inhibition task for false alarms (p = .01 and between the ADHD group, the ASD+ group (p = .03, the ASD- group (p = .02 and the TD group (p = .01 for omissions. Effect sizes showed clear deficits of ADHD children in inhibition and working memory tasks. Participants with ASD were impaired in planning and flexibility abilities. The ASD+ group showed compared to the ASD- group more problems in inhibitory performance but not in the working memory task. Conclusion Our findings replicate previous results reporting impairment of ADHD children in inhibition and working memory tasks and of ASD children in planning and flexibility abilities. The ASD + group showed similarities to the ADHD group with regard to inhibitory but not to working memory deficits. Nevertheless the heterogeneity of these and previous results shows that EF assessment is not useful for

  17. Regulating Customs – the 12th Annual International Conference of the SIEF Working group “The Ritual Year”, Findhorn (Scotland, 8–12 January 2016 (Scientific Life

    Directory of Open Access Journals (Sweden)

    Thomas McKean

    2016-04-01

    Full Text Available The 12th annual international conference of the SIEF Working group “The Ritual Year” took place in Findhorn, Morayshire, Scotland, 8–12 January 2016 under the general title “Regulating Customs”. The academic event was organized by Thomas McKean, with Frances Wilkins, Athanasios Barbalexis and Marlene Hugoson on the committee, under the auspices of the Elphinstone Institute, University of Aberdeen. The very venue of the conference, The Findhorn Foundation, apart from giving the scholars an opportunity to experience the local Scottish atmosphere, was most interesting from an ethnographic, religious, and folkloric point of view. The Foundation was established in 1964 as a place for spiritual growth; it has its own complex history (https://www.findhorn.org/, with many events related to the ritual year integrated into its calendar

  18. RISMC advanced safety analysis working plan: FY2015 - FY2019. Light Water Reactor Sustainability Program

    Energy Technology Data Exchange (ETDEWEB)

    Szilard, Ronaldo H; Smith, Curtis L

    2014-09-01

    In this report, the Advanced Safety Analysis Program (ASAP) objectives and value proposition is described. ASAP focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. The set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. As part of the discussion, we have identified three sets of stakeholders, the nuclear industry, the Department of Energy (DOE), and associated oversight organizations. These three groups would benefit from ASAP in different ways. For example, within the DOE complex, the possible applications that are seen include the safety of experimental reactors, facility life extension, safety-by-design in future generation advanced reactors, and managing security for the storage of nuclear material. This report provides information in five areas: (1) A value proposition (“why is this important?”) that will make the case for stakeholder’s use of the ASAP research and development (R&D) products; (2) An identification of likely end users and pathway to adoption of enhanced tools by the end-users; (3) A proposed set of practical and achievable “use case” demonstrations; (4) A proposed plan to address ASAP verification and validation (V&V) needs; and (5) A proposed schedule for the multi-year ASAP.

  19. Yakima Hatchery Experimental Design : Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig; Knudsen, Curtis; Marshall, Anne

    1991-08-01

    This progress report details the results and status of Washington Department of Fisheries' (WDF) pre-facility monitoring, research, and evaluation efforts, through May 1991, designed to support the development of an Experimental Design Plan (EDP) for the Yakima/Klickitat Fisheries Project (YKFP), previously termed the Yakima/Klickitat Production Project (YKPP or Y/KPP). This pre- facility work has been guided by planning efforts of various research and quality control teams of the project that are annually captured as revisions to the experimental design and pre-facility work plans. The current objective are as follows: to develop genetic monitoring and evaluation approach for the Y/KPP; to evaluate stock identification monitoring tools, approaches, and opportunities available to meet specific objectives of the experimental plan; and to evaluate adult and juvenile enumeration and sampling/collection capabilities in the Y/KPP necessary to measure experimental response variables.

  20. Constructing a ladder of transnational partnership working in support of marine spatial planning: thoughts from the Irish Sea.

    Science.gov (United States)

    Kidd, Sue; McGowan, Lynne

    2013-09-15

    This paper adds to the growing body of literature on partnerships and Marine Spatial Planning (MSP) by constructing a ladder of transnational partnership working which can act as an aid to partnership development. The first part draws upon partnership working and co-management literature and identifies 5 levels of transnational partnership working: Information Sharing; Administration Sharing; Agreed Joint Rules; Combined Organisation; and Combined Constitution and illustrates what these might entail with reference to established maritime partnerships. The second part of the paper then explores how these generic levels may be used to structure transnational partnership development in a particular marine setting. This draws upon the outputs of two Irish Sea Transnational Partnership Working events which were funded by the UK's Economic and Social Research Council, and in particular on the exploration of motivations for collaboration which was a key point of discussion. In conclusion the paper considers the strengths and weaknesses of the ladder and how it may be enhanced and used more widely to better understand and analyse existing transnational partnership activity and guide the development of new transnational partnerships in support of MSP.

  1. Health and Safety Work Plan for Sampling Colloids in Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    Marsh, J.D.; McCarthy, J.F.

    1994-01-01

    This Work Plan/Site Safety and Health Plan (SSHP) and the attached work plan are for the performance of the colloid project at WAG 5. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division (ESD) and associated ORNL environmental, safety, and health support groups. The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.

  2. Seasonal Predator Management Plan to Increase Suck Production on Horicon NWR

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Horicon National Wildlife Refuge was directed by the 1985 Annual Work Plan Advice to increase mallard and redhead production on the refuge. The limiting factor on...

  3. Computer aided planning of open cast coal. Planificacion informatizada cielo abierto carbon

    Energy Technology Data Exchange (ETDEWEB)

    Ochoa Ester, J.L.; San Miguel, J.M. (Hullera Vasco Leonesa, Madrid (Spain))

    1988-01-01

    The paper describes the planning, highly automated, and obtaining the functions relating costs with ashes and ratios, allowing to select the best working. It is remarkable for its versatility for manual design studies and the high degree of automatism reached in Planning and the getting of results oriented toward the Annual Plan definition and decision making in the future exploitation.

  4. Making the 2007-2010 Action Plan work for women in family medicine in the Asia Pacific

    Directory of Open Access Journals (Sweden)

    Coles Jan

    2010-01-01

    Full Text Available Abstract The Wonca Working Party for Women and Family Medicine (WWPWFM was organized in 2001 with the following objectives: to identify the key issues for women doctors; to review Wonca policies and procedures for equity and transparency; to provide opportunities to network at meetings and through the group's listserve and website; and to promote women doctors' participation in Wonca initiatives. In October 2008, at the Asia Pacific Regional conference, the Wonca Working Party on Women in Family Medicine (WWPWFM held a preconference day and conference workshops, building on the success and commitment to initiatives which enhance women's participation in Wonca developed in Ontario, Canada (2006 and at the Singapore World Congress (2007. At this meeting fifty women workshopped issues for women in Family Medicine in the Asia Pacific. Using the Action Plan formulated in Singapore (2007 the participants identified key regional issues and worked towards a solution. Key issues identified were professional issues, training in family medicine and women's health. Solutions were to extend the understanding of women's contributions to family medicine, improved career pathways for women in family medicine and improving women's participation in practices, family medicine organizations and academic meetings.

  5. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

  6. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  7. Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    SAIC

    2011-04-01

    The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

  8. Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Benioff, P.; Biang, C.; Haffenden, R.; Goyette, M.; Martino, L.; Patton, T.; Yuen, C.

    1995-05-01

    The purpose of the feasibility study is to gather sufficient information to develop and evaluate alternative remedial actions to address contamination at J-Field in compliance with the NCP, CERCLA, and SARA. This FS Work Plan summarizes existing environmental data for each AOC and outlines the tasks to be performed to evaluate and select remedial technologies. The tasks to be performed will include (1) developing remedial action objectives and identifying response actions to meet these objectives; (2) identifying and screening remedial action technologies on the basis of effectiveness, implementability, and cost; (3) assembling technologies into comprehensive alternatives for J-Field; (4) evaluating, in detail, each alternative against the nine EPA evaluation criteria and comparing the alternatives to identify their respective strengths and weaknesses; and (5) selecting the preferred alternative for each operable unit.

  9. FY 1991 environmental research programs for the Nevada Operations Office: Work plan and quarterly reports, first and second quarter reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-05-01

    The work carried out on behalf of the DOE by the Desert Research Institute (DRI) includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to stat and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. This document contains the Work Plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

  10. Role of Surgical Services in Profitability of Hospitals in California: An Analysis of Office of Statewide Health Planning and Development Annual Financial Data.

    Science.gov (United States)

    Moazzez, Ashkan; de Virgilio, Christian

    2016-10-01

    With constant changes in health-care laws and payment methods, profitability, and financial sustainability of hospitals are of utmost importance. The purpose of this study is to determine the relationship between surgical services and hospital profitability. The Office of Statewide Health Planning and Development annual financial databases for the years 2009 to 2011 were used for this study. The hospitals' characteristics and income statement elements were extracted for statistical analysis using bivariate and multivariate linear regression. A total of 989 financial records of 339 hospitals were included. On bivariate analysis, the number of inpatient and ambulatory operating rooms (ORs), the number of cases done both as inpatient and outpatient in each OR, and the average minutes used in inpatient ORs were significantly related with the net income of the hospital. On multivariate regression analysis, when controlling for hospitals' payer mix and the study year, only the number of inpatient cases done in the inpatient ORs (β = 832, P = 0.037), and the number of ambulatory ORs (β = 1,485, 466, P = 0.001) were significantly related with the net income of the hospital. These findings suggest that hospitals can maximize their profitability by diverting and allocating outpatient surgeries to ambulatory ORs, to allow for more inpatient surgeries.

  11. Pluri-annual planning of power generation investments. 2005-2015 era; Programmation pluriannuelle des investissements de production electrique. Periode 2005-2015

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The pluri-annual planning of power generation investments (PPI) is provided by article 6 of the law from February 10, 2000 relative to the modernization and development of the electric utility. The PPI is the concrete translation of the energy policy and aims to identify the necessary investments with respect to the security of power supplies and beyond the already known commitments. In the framework of market deregulation and respect of competition, the PPI is limited to the identification of such investments but not to their realization. This document, which corresponds to the 2005 exercise, is the second report to the Parliament. It stresses on the following points: the mastery of power demand and the demand scenarios, the level of accepted risk, the carrying out of the development of renewable energy sources (5 GW by 2010 and 12.5 GW by 2016 for wind power, and 6 TWh more for biomass by 2016), the start-up of an EPR reactor in 2012, the investment needs for classical thermal power plants (+2.6 GW of diesel fuel power plants and +500 MW of combustion turbines as decided by EdF), the development of production means in 2 regions with specific needs: Provence-Alpes-Cote d'Azur and Bretagne (Brittany), and also in insular areas (Corsica and overseas territories), and the reflexions to carry on in continuation of the PPI. (J.S.)

  12. Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

    1993-07-01

    This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

  13. Financial planning working capital ventures using software «analyzer bdds» sold on the basis of selection of optimal bond portfolio

    Directory of Open Access Journals (Sweden)

    N.J. Timofeeva

    2011-05-01

    Full Text Available This article examines the financial planning of working capital organizations, in particular presented a software implementation of the algorithm analyzes the budget forecast working capital, identify and take advantage of temporarily free money using a model of a decision on the choice of the optimal bond portfolio, consistent with the free flow of liquidity of the enterprise.

  14. [Quality of life, work management, and career planning as a primary care technology in the Unified National Health System in São Paulo State, Brazil].

    Science.gov (United States)

    Lacaz, Francisco Antonio de Castro; Vieira, Nelson Passagem; Cortizo, Carlos Tato; Junqueira, Virgínia; dos Santos, Ana Paula Lopes; Santos, Fabio Souza

    2010-02-01

    This article discusses the concept of quality of life in and at work, linked to health work management based on the evaluation of a work management instrument: the Career, Job, and Wage Plan. The aim was to analyze the plan as a work management technology in primary care in the Unified National Health System (SUS). The article discusses the plan in three municipalities in São Paulo State, Brazil: São Paulo, Guarulhos, and Campinas, in compliance with guidelines issued by the National Health Council in 2006, and using a qualitative survey conducted in 2007-2008. The study presents the findings from research in eight municipalities, based on interviews with managers, users (represented by Health Councils), and health workers and health sector trade unionists. The article concludes that this is still an incipient public management policy issue, with limited command by users, trade unionists, and health workers in the target municipalities, heavily populated 'hub cities' in the health regions.

  15. FY 1991 environmental research programs for the DOE Field Office, Nevada: Work plan and quarterly reports, fourth quarter report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-10-01

    This research includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which required DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. In accordance with specific contract requirements for each activity, DRI will produce summary, status and final reports and, in some cases, journal articles which will present the results of specific research efforts. This document contains the work plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

  16. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

  17. 浅谈施工图阶段的场地规划设计%A Brief Talk On Site Planning Design In Working Drawing Phase

    Institute of Scientific and Technical Information of China (English)

    李晓庆

    2012-01-01

    Site planning design is an important content of architecture and city planning specialty. The author states the design content in site drawing phase combining with actual work from the aspects of planning and design.%场地规划设计是建筑学与城市规划专业在工作中的重要内容,也是实际工程中的重要环节。笔者从规划设计角度,结合实际工作,阐述了场地施工图阶段设计的主要内容。

  18. Annual Report 1997

    Energy Technology Data Exchange (ETDEWEB)

    Golnik, N.; Mika, J.R.; Wieteska, K. [eds.

    1998-12-31

    This Annual Report of the Institute of Atomic Energy describes the results of the research works carried out at the Institute at 1997. As in the preceding years the authors of the individual scientific reports published in this Annual Report are fully responsible for their content and layout. The Report contains the information on other activities of the Institute as well. (author)

  19. Report to the parliament. Pluri-annual planning of power production investments; Rapport au parlement. Programmation pluriannuelle des investissements de production electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-01-01

    The article 6 of the law from February 10, 2000, relative to the modernization and development of the electric utility, schedules a pluri-annual planning of the production investments (PPI) which represents a concrete translation of the energy policy in the domain of electricity. The PPI will allow to reach the energy policy goals using a balanced development of the national production means in terms of primary energy sources, techniques of production and geographical distribution of investments. This document is the first PPI report to the parliament. It is based on the scheme of energy collective services and on a provisional status made by the manager of the transportation network (RTE). In 2010, renewable energies should cover 21% of the French electricity needs. This ratio will be reached mainly thanks to the development of wind power (7000 to 14000 MW of installed power, which represents 20 to 35 TWh of additional production). Hydro-power should be increased of 8 TWh max, depending on the public policies implemented, and biomass will have a significant contribution too. On the other hand, actions of mastery of the electricity demand will have to be implemented. From 2008 onward, the decommissioning of several power plants will impose to find new solutions to satisfy the peak power needs. The covering of consumption peaks requires a correlation study of the power peaks at the European scale. Finally, the situation of non-interconnected areas and of areas with fragile supply has been carefully considered. The creation of new power production means must be envisaged in most of these areas. (J.S.)

  20. Final work plan : supplemental upward vapor intrusion investigation at the former CCC/USDA grain storage facility in Hanover, Kansas.

    Energy Technology Data Exchange (ETDEWEB)

    LaFreniere, L. M.; Environmental Science Division

    2008-12-15

    The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility at the northeastern edge of the city of Hanover, Kansas, from 1950 until the early 1970s. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In February 1998, trace to low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5.0 {micro}g/L) were detected in two private wells near the former grain storage facility at Hanover, as part of a statewide USDA private well sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. In 2007, the CCC/USDA conducted near-surface soil sampling at 61 locations and also sampled indoor air at nine residences on or adjacent to its former Hanover facility to address the residents concerns regarding vapor intrusion. Low levels of carbon tetrachloride were detected at four of the nine homes. The results were submitted to the KDHE in October 2007 (Argonne 2007). On the basis of the results, the KDHE requested sub-slab sampling and/or indoor air sampling (KDHE 2007). This Work Plan describes, in detail, the proposed additional scope of work requested by the KDHE and has been developed as a supplement to the comprehensive site investigation work plan that is pending (Argonne 2008). Indoor air samples collected previously from four homes at Hanover were shown to contain the carbon tetrachloride at low concentrations (Table 2.1). It cannot be concluded from these previous data that the source of the detected carbon tetrachloride is vapor intrusion attributable to former grain storage operations of the CCC/USDA at Hanover. The technical objective of the vapor intrusion investigation described here is to assess the risk to human health due to the potential for upward migration of carbon tetrachloride and