WorldWideScience

Sample records for annual operating plan

  1. 2010 Cooperative Initial Attack Annual Operating Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objective of this plan is to provide a pre-approved system to coordinate efforts and exchange or utilize resources for the prevention, detection, and...

  2. C-Division annual review and operating plan, August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Morse, N.R.

    1990-11-01

    The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

  3. Low-temperature thermal energy storage program annual operating plan

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, H. W.; Eissenberg, D. M.

    1979-01-01

    The LTTES program operating plans for FY 1978 are described in terms of general program objectives and the technical activities being implemented to achieve these objectives. The program structure provides emphasis on several principal thrusts; namely, seasonal thermal storage, daily/short-term thermal storage, and waste heat recovery and reuse. A work breakdown structure (WBS) organizes the efforts being carried out in-house or through subcontract within each thrust area. Fiscal data are summarized in respect to thrust area, individual efforts, and funding source.

  4. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  5. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  6. 1997 annual ground control operating plan for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    This plan presents background information and a working guide to assist Mine Operations and Engineering in developing strategies for addressing ground control issues at the Waste Isolation Pilot Plant (WIPP). With the anticipated receipt of waste in late 1997, this document provides additional detail to Panel 1 activities and options. The plan also serves as a foundation document for development and revision of the annual long-term ground control plan. Section 2.0 documents the current status of all underground excavations with respect to location, geology, geometry, age, ground support, operational use, projected life, and physical conditions. Section 3.0 presents the methods used to evaluate ground conditions, including visual observations of the roof, ribs, and floor, inspection of observation holes, and review of instrumentation data. Section 4.0 lists several ground support options and specific applications of each. Section 5.0 discusses remedial ground control measures that have been implemented to date. Section 6.0 presents projections and recommendations for ground control actions based on the information in Sections 2.0 through 5.0 of this plan and on a rating of the critical nature of each specific area. Section 7.0 presents a summary statement, and Section 8.0 includes references. Appendix A provides an overview and critique of ground control systems that have been, or may be, used at the site. Because of the dynamic nature of the underground openings and associated geotechnical activities, this plan will be revised as additional data are incorporated.

  7. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  8. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  9. Planning Annual Shutdown Inspection for BFB Boiler

    OpenAIRE

    Sorsa, Tatu

    2014-01-01

    The goal of this thesis was to create an illustrative guidebook of annual inspection planning for BFB boiler to help power plant operator when planning of annual inspection is topical. This thesis was made for Andritz Oy and it is based on inspection reports and experiences of BFB boiler’s maintenance and inspection staff. In this thesis it is shown how to plan an annual inspection for BFB boiler and thesis gives good tools and hints for operator to manage inspection from the beginning ...

  10. 1988 Annual water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1987 Annual Water Management Report 1988 Annual Water Management Plan. Includes 1987 weather summary, water availability forecast, summary of 1987...

  11. FY 1994 Annual Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

  12. 45 CFR 1176.5 - Annual plan.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Annual plan. 1176.5 Section 1176.5 Public Welfare... ENDOWMENT FOR THE HUMANITIES PART-TIME CAREER EMPLOYMENT § 1176.5 Annual plan. (a) An agencywide plan for promoting part-time employment opportunities will be developed annually. This plan will establish...

  13. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  14. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2015-01-01

    This paper investigates sales and operations planning (S&OP) at four Scandinavian industrial food producers in order to explore how the use of S&OP might help leaders to deal with the challenges set by the planning environment. Variables connected to the product and market, e.g., frequency of new...

  15. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...

  16. Operation plan : Alviso System

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the operation plan for ponds A2W, A3W, A7, A14, and A16 in the Alviso System at San Francisco Bay NWR Complex. Operating instructions for both winter and...

  17. Audubon NWR complex annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  18. 1986-87 Annual Trapping Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Trapping Plan for the 1986-87 trapping season at Clarence Cannon NWR outlines rules and regulations for the trapping of beaver, muskrat, raccoon,...

  19. Office of Inspector General fiscal year 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  20. Operations planning with VERT.

    Science.gov (United States)

    Moeller, G L; Digman, L A

    1981-01-01

    The Venture Evaluation and Review Technique (VERT) is a computerized, mathematically oriented network-based simulation technique designed to analyze risk existing in three parameters of most concern to managers in new projects or ventures--time, cost, and performance. As such, the VERT technique is more powerful than techniques such as GERT, which are basically time and cost oriented. VERT has been successfully utilized to assess the risks involved in new ventures and projects, in the estimation of future capital requirements, in control monitoring, and in the overall evaluation of ongoing projects, programs, and systems. It has been helpful to management in cases where there is a requirement to make decisions with incomplete or inadequate information about the alternatives. An example describing the application of VERT to an operational planning problem--the evaluation of electric power generating methods--is illustrated.

  1. Environmental Planning and Ecology Program Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  2. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  3. Conduct of operations implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  4. Country Operational Plan and Reporting System

    Data.gov (United States)

    US Agency for International Development — This web-based information system allows for the annual entry and updating of Emergency Plan COPs, annual and semiannual program results, and budget information by...

  5. Annual Report on SPR Operation in 2002

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    1 Information of operation SPR is operated for 2 727.983 h in 2002, the reactor’s rated power is 3.5 MW,and the total releasedenergy is 397.831 MW d Times of reactor’s operation and non-plan shut-down are 20 and 37,respectively. The pH and resistivity of primary loop water is 5.8 and 66.7×10~4Ω·cm, respectively;

  6. Annual Habitat Work Plan Prime Hook National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge will begin developing its Comprehensive Conservation Plan in fiscal year 2005. This Annual Habitat Work Planning report will summarize accomplishments for...

  7. Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan summarizes last years planned water management program and actual CY 1983 water events. A more detailed summary is available in the CY 1983 Annual Water...

  8. Synchronizing Federal Operational Planning for National Catastrophes

    Science.gov (United States)

    2010-03-01

    63 1. Ireland: The Planning Uber -Department .............................. 63 2. Canada: Collaboration with Muscle...The Planning Uber -Department The Ireland National Government makes a clear distinction between planning and operations. The Minister of Defense (MOD...the federal planning system. The Irish model of an “ Uber -Department” for planning and the Canadian model of a department in charge of both operations

  9. Proceedings 16th Annual Meeting, Aquatic Plant Control Research Planning and Operations Review Held at St. Paul, Minnesota on 17-19 November 1981.

    Science.gov (United States)

    1982-06-01

    34 Aquatic Botany, Vol 3, pp 239-255. Chapin, F. S. 1980. "The Mineral Nutrition of Wild Plants," Annual Review of Ecology and Systematics , Vol 11, pp 233-260...biology and host specificity. This population was later identified as P. diminutalis (Snellen) (Figure 1) by Dr. D. Ferguson, Systematics Entomology...of many mats were heavily damaged. REFERENCES Agassiz, D. 1981. "Further Introduced China Mark Moths ( Lepidoptera : Pyralidae) New to Britain

  10. 77 FR 43488 - Continuity of Operations Plan

    Science.gov (United States)

    2012-07-25

    ... Energy Regulatory Commission 18 CFR Part 376 Continuity of Operations Plan AGENCY: Federal Energy... pertaining to its Continuity of Operations Plan to allow the Commission the discretion to better address not... Operations Plan and any suspension of Commission operations; the length of time that the Continuity...

  11. LANL continuity of operations plan

    Energy Technology Data Exchange (ETDEWEB)

    Senutovitch, Diane M [Los Alamos National Laboratory

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may

  12. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ... Federal Energy Regulatory Commission 18 CFR Part 376 Continuity of Operations Plan AGENCY: Federal Energy... Continuity of Operations Plan regulations to revise its hierarchy of delegation of Commission authority... Rule revises the Commission's Continuity of Operations Plan (COOP) regulations to incorporate...

  13. Proceedings, 15th Annual Meeting, Aquatic Plant Control Research Planning and Operations Review, held 17-20 November 1980, Savannah, Georgia.

    Science.gov (United States)

    1981-10-01

    Resources Management Branch (RRMB), Office, Chief of Engineers (OCE) 9:15 a.m. Establishment of the APC Operacions Support Center at the 9:0Jacksonville...Cardarelli (1976). Since pesticidal chemicals are not soluble in plastic matrices , it was believed that no operable release mechanism was possible. However...University of Akron, Akron, Ohio. 288 _ _ _ _ _ _ _ __ _ _ _ _ ,1 -1_ _ _ _ _ Insecticide work began with thermoplastic matrices in 1975. It was

  14. Annual water management plan - 1983-1984

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  15. Annual water management plan 1994-1995

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Arapahoe National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  16. Annual Water Management Plan, Part II

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan is to establish a schedule...

  17. Annual Report on SPR Operation in 2011

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    1 Information of operation Operation person: present chief operators are 11 persons, operators are 6 persons; new chief operators are 3 persons, new operator is 1 person; training chief operators are 3 persons, training operators are 1 persons;

  18. NWRS Region 1 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 1, Inventory and Monitoring Program (I present vision and...

  19. NWRS Region 8 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 8, Inventory and Monitoring Program (I present vision and...

  20. NWRS Region 3 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 3, Inventory and Monitoring Program (I present vision and...

  1. NWRS Region 4 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 4, Inventory and Monitoring Program (I present vision and...

  2. Upper Souris National Wildlife Refuge annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Upper...

  3. Lostwood National Wildlife Refuge annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  4. Rainwater Basin Wetland Management District annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  5. Waubay National Wildlife Refuge Complex annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  6. Huron Wetland Management District annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Huron...

  7. Des Lacs National Wildlife Refuge annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Des...

  8. Lee Metcalf National Wildlife Refuge 2005 annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Lee...

  9. Bowdoin National Wildlife Refuge Complex 2005 annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  10. Arapaho National Wildlife Refuge 2005 annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  11. Boyer Chute National Wildlife Refuge 2005 annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Boyer...

  12. Kulm Wetland Management District annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Kulm...

  13. Tewaukon National Wildlife Refuge Complex annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  14. Annual Habitat Work Plan, North Mississippi Refuges Complex 2011

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2011 on Dahomey, Tallhatchie, Coldwater River Refuges and the Henson FSA Tract of the North MS Refuge...

  15. Annual Habitat Work Plan, North Mississippi Refuges Complex 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2005 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  16. Annual Habitat Work Plan, North Mississippi Refuges Complex 2008

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2008 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  17. Pocosin Lakes National Wildlife Refuge : 2006 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2006 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  18. Pocosin Lakes National Wildlife Refuge : 2004 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2004 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  19. Pocosin Lakes National Wildlife Refuge : 2000 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2000 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  20. Pocosin Lakes National Wildlife Refuge : 2002 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2002 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  1. Pocosin Lakes National Wildlife Refuge : 2003 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2003 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  2. Pocosin Lakes National Wildlife Refuge : 2001 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2001 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  3. Pocosin Lakes National Wildlife Refuge : 1999 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 1999 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  4. Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The primary goal of the annual water plan is to set a strategy for the most efficient use of the available water delivered to Stillwater WMA. For all practical...

  5. NWRS Region 6 Inventory & Monitoring FY 2011 Annual Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual work plan for U.S. Fish and Wildlife Service, National Wildlife Refuge System, Region 6, Inventory and Monitoring Program (I present vision and...

  6. Annual Habitat Work Plan, North Mississippi Refuges Complex 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2012 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  7. Annual Burn Plan FY 94 : Brussels District Mark Twain NWR

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual burn plan for the Brussels District of Mark Twain NWR provides proposals for the Calhoun Division and the Gilbert Lake Division. Each proposal includes a...

  8. Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The primary goal of the annual water plan is to set a strategy for the 'most efficient use of the available water delivered to Stillwater WMA. For all practical...

  9. Annual Habitat Work Plan, North Mississippi Refuges Complex 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat work plan outlines tasks to be completed in FY 2004 on Dahomey, Tallhatchie, Coldwater River Refuges of the North MS Refuge Complex. Report also...

  10. Pocosin Lakes National Wildlife Refuge : 2005 Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 2005 Annual Water Management Plan for Pocosin Lakes National Wildlife Refuge is used as aguide to manage the refuge's 4 lakes and 5 moist soil units, for...

  11. ICDF Complex Operations Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  12. FY 1999 annual work plan for infrastructure program WBS 6

    Energy Technology Data Exchange (ETDEWEB)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  13. Operation plan : Baumberg Complex Pond System

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Operations Plan describes the management activities required to meet the overall goals and objectives described in the Initial Stewardship Plan (ISP) and the...

  14. National Ignition Facility (NIF) operations procedures plan

    Energy Technology Data Exchange (ETDEWEB)

    Mantrom, D.

    1998-05-06

    The purpose of this Operations Procedures Plan is to establish a standard procedure which outlines how NIF Operations procedures will be developed (i.e , written, edited, reviewed, approved, published, revised) and accessed by the NIF Operations staff who must use procedures in order to accomplish their tasks. In addition, this Plan is designed to provide a guide to the NIF Project staff to assist them in planning and writing procedures. Also, resource and scheduling information is provided.

  15. 75 FR 57553 - Indexing the Annual Operating Revenues of Railroads

    Science.gov (United States)

    2010-09-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... indexing methodology insures that railroads are classified based on real business expansion and not...

  16. 76 FR 52384 - Indexing the Annual Operating Revenues of Railroads

    Science.gov (United States)

    2011-08-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... indexing methodology insures that railroads are classified based on real business expansion and not...

  17. 77 FR 34125 - Indexing the Annual Operating Revenues of Railroads

    Science.gov (United States)

    2012-06-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF TRANSPORTATION Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... indexing methodology insures that railroads are classified based on real business expansion and not...

  18. 78 FR 21007 - Indexing the Annual Operating Revenues of Railroads

    Science.gov (United States)

    2013-04-08

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF TRANSPORTATION Surface Transportation Board Indexing the Annual Operating Revenues of Railroads The Surface... indexing methodology insures that railroads are classified based on real business expansion and not...

  19. Quayside Operations Planning Under Uncertainty

    DEFF Research Database (Denmark)

    Iris, Cagatay; Jin, Jian Gang; Lee, Der-Hong

    The quayside operation problem is one of the key components in the management system for a container terminal. This work focuses on three important problems that represent a bottleneck on terminal operations: Berth Allocation Problem (BAP), Quay Crane Assignment and Scheduling Problems (QCASP......).The state-of-art models mostly rely on forecasted, deterministic vessel arrivals, and they mostly assume that uniform QC operations is maintained. However, in reality, these parameters are mostly random. In this study, we present a stochastic programming approach based on a decomposition algorithm to solve...

  20. System Summary of University Annual Work Plans, 2014-15

    Science.gov (United States)

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future; (1) The Board of Governors' new Strategic Plan 2012-2025 is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's Annual Accountability Report provides yearly tracking for how the System is…

  1. Collaborative planning of operations in industrial symbiosis

    DEFF Research Database (Denmark)

    Herczeg, Gabor; Akkerman, Renzo

    2014-01-01

    Industrial symbiosis (IS) is cooperation between companies to achieve collective benefits by supplying and reusing industrial waste to substitute virgin resources in production. In this paper, we investigate the IS phenomenon from a supply chain management perspective. We propose a collaborative...... planning model to coordinate master planning of operations of waste suppliers and buyers. Furthermore, we analyze planning decisions related to IS when waste exchange is combined with virgin resource procurement. We demonstrate that conditions of virgin resource procurement affect the economic feasibility...

  2. 1989 Annual water management report 1990 Annual water management plan : Ruby Lake National Wildlife Refuge : Ruby Valley Nevada

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1989 Annual Water Management Report 1990 Annual Water Management Plan. Includes 1989 weather summary, water availability forecast, summary of 1989...

  3. Ruby Lake National Wildlife Refuge : Ruby Valley Nevada : 1992 Annual water management report 1993 Annual water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1992 Annual Water Management Report 1993 Annual Water Management Plan. Includes summary of 1992 weather, 1992 water levels, water availability forecast...

  4. 1990 Annual water management report 1991 Annual water management plan : Ruby Lake National Wildlife Refuge : Ruby Valley Nevada

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1990 Annual Water Management Report 1991 Annual Water Management Plan. Includes 1990 weather summary, water availability forecast, summary of 1990...

  5. Ruby Lake National Wildlife Refuge : Ruby Valley Nevada : 1991 Annual water management report 1992 Annual water management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1991 Annual Water Management Report 1992 Annual Water Management Plan. Includes Ruby Lake 1991 weather summary, summary of 1991 water levels, water...

  6. Kalispel Resident Fish Project- Kalispel Tribal Hatchery Operations and Maintenance, 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kalispel Tribe, Department of Natural Resources

    1998-01-01

    In 1996, construction activities commenced on a largemouth bass hatchery located on the Kalispel Indian Reservation. The major construction activities were complete as of October 1997. Of the six objectives identified in the 1997 Annual Operating Plan two objectives were fully achieved: the assembly of the life support system, and the preparation of the hatchery Operations and Maintenance Manual. The remaining four objectives were not fully achieved due to the hatchery not being completed before the spawning season (spring).

  7. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  8. ICD Complex Operations and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  9. New heuristics for planning operating rooms.

    NARCIS (Netherlands)

    Molina-Pariente, J.M.; Hans, E.W.; Framinan, J.M.; Gomez-Cia, T.

    2015-01-01

    We tackle the operating room planning problem of the Plastic Surgery and Major Burns Specialty of the University Hospital “Virgen del Rocio” in Seville (Spain). The decision problem is to assign an intervention date and an operating room to a set of surgeries on the waiting list, minimizing access t

  10. National Security Technology Incubator Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-04-30

    This report documents the operations plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The operation plan includes detailed descriptions of the structure and organization, policies and procedures, scope, tactics, and logistics involved in sustainable functioning of the NSTI program. Additionally, the operations plan will provide detailed descriptions of continuous quality assurance measures based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Forms that assist in operations of NSTI have been drafted and can be found as an attachment to the document.

  11. Polar Research Board annual report, 1987 and future plans

    Energy Technology Data Exchange (ETDEWEB)

    1988-12-31

    This annual report describes the Polar Research Board, its origin and objectives, its work and plans, and its principle activities and accomplishments during calendar year 1987. The Overview presents a concise summary of the various aspects of the Board`s program and of its responsibilities as US National Committee for the Scientific Committee on Antarctic Research (SCAR) of the International Council of Scientific Unins. Arctic and Antarctic activities are described.

  12. Polar Research Board annual report, 1987 and future plans

    Energy Technology Data Exchange (ETDEWEB)

    1988-01-01

    This annual report describes the Polar Research Board, its origin and objectives, its work and plans, and its principle activities and accomplishments during calendar year 1987. The Overview presents a concise summary of the various aspects of the Board's program and of its responsibilities as US National Committee for the Scientific Committee on Antarctic Research (SCAR) of the International Council of Scientific Unins. Arctic and Antarctic activities are described.

  13. Annual procurement operations report, FY 1977

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-01

    Several agencies were merged into the new Department of Energy on October 1, 1977. These agencies included the Energy Research and Development Administration, Federal Energy Administration, part of the Bureau of Mines, and parts of the Naval Petroleum Reserve establishment. This is a report of the activities of the procurement groups of these agencies during Fiscal Year 1977. The efforts detailed in this report were seminal to the energy program. New technologies; new industries; new products; and new professions are under development. The direction is now set for future energy commercialization. Procurement's role consists of giving the direction for and ensuring the proper application of sound business practices that result in the proper and economical placement of energy contracts and their efficient and timely completion. Procurement Operations' role is to make this happen on assigned programs. It is hoped that this report will convey the scope of the effort involved in this endeavor, and give persons within the Department of Energy a more accurate concept of what is taking place in Procurement Operations.

  14. Kennedy Space Center Orion Processing Team Planning for Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis

  15. New plan of strategy and organization. Annual report 1995; Ny strategisk plan og organisasjon. Aarsberetning 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The annual report from EFI (Norwegian Research Institute for Electricity) relates to an new strategic plan and organization of the institute. An example of this is the Research Council of Norway`s new R and D programme EFFEKT, which will be a major locomotive for research up to the year 2000. Topics are: EFI`s new strategic plan and organization; extracts from the Board`s annual report; extract from the accounts; diagnostic testing of circuit-breakers; breakdown and interruption statistics from the grid; power system reliability

  16. Planning, Management, and Economics of Airport Operation

    Science.gov (United States)

    Wiley, J.

    1972-01-01

    An overview of the role of the airport in the transportation complex and in the community is presented. The establishment of the airport including its requirements in regional planning and the operation of the airport as a social and economic force are discussed.

  17. 36 CFR 228.106 - Operator's submission of surface use plan of operations.

    Science.gov (United States)

    2010-07-01

    ... supplemental plan of operations is submitted. The supplemental plan of operations need only address those... surface use plan of operations. 228.106 Section 228.106 Parks, Forests, and Public Property FOREST SERVICE....106 Operator's submission of surface use plan of operations. (a) General. No permit to drill on...

  18. 30 CFR 780.13 - Operation plan: Blasting.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Blasting. 780.13 Section 780.13... Operation plan: Blasting. (a) Blasting plan. Each application shall contain a blasting plan for the proposed... methods to be applied in controlling the adverse effects of blasting operations. (b) Monitoring...

  19. 1989 Annual water management plan : Ruby Lake National Wildlife Refuge : Ruby Valley Nevada

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Ruby Lake NWR 1988 Annual Water Management Report 1989 Annual Water Management Plan. Includes 1988 weather summary, water availability forecast, summary of 1988...

  20. Flint Hills National Wildlife Refuge : Annual habitat work plan (calendar year 2009)

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Annual habitat management work plan for the calendar year of 2009 at Flint Hills National Wildlife Refuge. Management plans for each habitat type is included as well...

  1. 1993 Annual Water Management Plan: Mark Twain National Wildlife Refuge: Wapello District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 1993 Annual Mark Twain NWR- Wapello District Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose...

  2. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  3. Analysis and evaluation of operational data. Annual report, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The United States Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) has published reports of its activities since 1984. The first report covered January through June of 1984, and the second report covered July through December of 1984. After those first two semiannual reports, AEOD published annual reports of its activities from 1985 through 1993. Beginning with report for 1986, AEOD Annual Reports have been published as NUREG-1272. Beginning with the report for 1987, NUREG-1272 has been published in two parts, No. 1 covering power reactors and No. 2 covering nonreactors (changed to `nuclear materials` with the 1993 report). AEOD changed its annual report from a calendar year (CY) to a fiscal year report, and added part No. 3 covering technical training, beginning with the combined Annual Report for CY 1994 and fiscal year 1995, NUREG-1272, Vol. 9, Nos. 1-3. This report, NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in applications other than power reactores. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the fiscal year 1996 operating experience of the nuclear power industry from the NRC perspective. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission. Throughout these reports, whenever information is presented for a calendar year, it is so designated. Fiscal year information is designated by the four digits of the fiscal year.

  4. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) of riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.

  5. Savannah River Site Approved Site Treatment Plan, 1998 Annual Update

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B. [Westinghouse Savannah River Company, AIKEN, SC (United States); Berry, M.

    1998-03-01

    The U.S. Department of Energy, Savannah River Operations Office (DOE- SR),has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume I. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore,pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021.Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW.The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  6. 14 CFR 136.13 - Helicopter performance plan and operations.

    Science.gov (United States)

    2010-01-01

    ... TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS COMMERCIAL AIR TOURS AND NATIONAL PARKS AIR TOUR MANAGEMENT National Air Tour Safety Standards § 136.13 Helicopter performance plan and operations. (a) Each operator must complete a performance plan before...

  7. Automated transit planning, operation, and applications

    CERN Document Server

    Liu, Rongfang

    2016-01-01

    This book analyzes the successful implementations of automated transit in various international locations, such as Paris, Toronto, London, and Kuala Lumpur, and investigates the apparent lack of automated transit applications in the urban environment in the United States. The book begins with a brief definition of automated transit and its historical development. After a thorough description of the technical specifications, the author highlights a few applications from each sub-group of the automated transit spectrum. International case studies display various technologies and their applications, and identify vital factors that affect each system and performance evaluations of existing applications. The book then discusses the planning and operation of automated transit applications at both macro and micro levels. Finally, the book covers a number of less successful concepts, as well as the lessons learned, allow ng readers to gain a comprehensive understanding of the topic.

  8. National volcanic ash operations plan for aviation

    Science.gov (United States)

    ,; ,

    2007-01-01

    The National Aviation Weather Program Strategic Plan (1997) and the National Aviation Weather Initiatives (1999) both identified volcanic ash as a high-priority informational need to aviation services. The risk to aviation from airborne volcanic ash is known and includes degraded engine performance (including flameout), loss of visibility, failure of critical navigational and operational instruments, and, in the worse case, loss of life. The immediate costs for aircraft encountering a dense plume are potentially major—damages up to $80 million have occurred to a single aircraft. Aircraft encountering less dense volcanic ash clouds can incur longer-term costs due to increased maintenance of engines and external surfaces. The overall goal, as stated in the Initiatives, is to eliminate encounters with ash that could degrade the in-flight safety of aircrews and passengers and cause damage to the aircraft. This goal can be accomplished by improving the ability to detect, track, and forecast hazardous ash clouds and to provide adequate warnings to the aviation community on the present and future location of the cloud. To reach this goal, the National Aviation Weather Program established three objectives: (1) prevention of accidental encounters with hazardous clouds; (2) reduction of air traffic delays, diversions, or evasive actions when hazardous clouds are present; and (3) the development of a single, worldwide standard for exchange of information on airborne hazardous materials. To that end, over the last several years, based on numerous documents (including an OFCMsponsored comprehensive study on aviation training and an update of Aviation Weather Programs/Projects), user forums, and two International Conferences on Volcanic Ash and Aviation Safety (1992 and 2004), the Working Group for Volcanic Ash (WG/VA), under the OFCM-sponsored Committee for Aviation Services and Research, developed the National Volcanic Ash Operations Plan for Aviation and Support of the

  9. [From national strategic plans to operational implementation: opportunities and risks].

    Science.gov (United States)

    Etchepare, M

    2013-01-01

    Currently, all countries in Africa are - to various degrees - involved in reform and planning programs, either because they chose to or at the behest of international institutions working with them. Here we present an operational definition of a strategic plan and then analyze the factors that promote and constrain the planning process and the implementation of the plan thus developed.

  10. Planning and Conducting Offensive Counterinformation Operations

    Science.gov (United States)

    2002-04-01

    doctrine calls this special information operations (SIO)) which precludes timely data sharing and collaboration amongst the proper experts, planners, and...is classified as special information operations. Offensive information operations are conducted across the range of military operations while...Operations RF Radio Frequency ROE Rules of Engagement SecDef Secretary of Defense SIO Special Information Operations SOF Special Operations Force

  11. Simulation-based decision support for evaluating operational plans

    Directory of Open Access Journals (Sweden)

    Johan Schubert

    2015-12-01

    Full Text Available In this article, we describe simulation-based decision support techniques for evaluation of operational plans within effects-based planning. Using a decision support tool, developers of operational plans are able to evaluate thousands of alternative plans against possible courses of events and decide which of these plans are capable of achieving a desired end state. The objective of this study is to examine the potential of a decision support system that helps operational analysts understand the consequences of numerous alternative plans through simulation and evaluation. Operational plans are described in the effects-based approach to operations concept as a set of actions and effects. For each action, we examine several different alternative ways to perform the action. We use a representation where a plan consists of several actions that should be performed. Each action may be performed in one of several different alternative ways. Together these action alternatives make up all possible plan instances, which are represented as a tree of action alternatives that may be searched for the most effective sequence of alternative actions. As a test case, we use an expeditionary operation with a plan of 43 actions and several alternatives for these actions, as well as a scenario of 40 group actors. Decision support for planners is provided by several methods that analyze the impact of a plan on the 40 actors, e.g., by visualizing time series of plan performance. Detailed decision support for finding the most influential actions of a plan is presented by using sensitivity analysis and regression tree analysis. Finally, a decision maker may use the tool to determine the boundaries of an operation that it must not move beyond without risk of drastic failure. The significant contribution of this study is the presentation of an integrated approach for evaluation of operational plans.

  12. Ontological Models to Support Planning Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. However, the major...

  13. Ontological Models to Support Planning Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. A fundamental requirement...

  14. Combined Annual Habitat Work Plans, 2010-2012 : Fish Springs NWR

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This combined Annual Habitat Work Plan (AHWP) for Fish Springs National Wildlife Refuge provides a report on habitat management activities for years 2010- 2012 and...

  15. Lake Andes National Wildlife Refuge Complex annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Lake...

  16. Sand Lake National Wildlife Refuge/Wetland Management District annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Sand...

  17. Crescent Lake/North Platte National Wildlife Refuge Complex 2005 annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  18. Long Lake National Wildlife Refuge Complex annual habitat work plan 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for Long...

  19. Devils Lake Wetland Management District Complex 2005 annual habitat work plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual habitat management plan outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience for...

  20. National Wildlife Refuge System Region 7 Inventory and Monitoring Regional Annual Work Plan Fiscal Year 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 7 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  1. Region 1 National Wildlife Refuge System Inventory and Monitoring Program : Annual Work Plan : Fiscal Year 2012

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The annual work plan for Region 1 discusses the goals and objectives of the Inventory and Monitoring (I&M) program for fiscal year 2012. The introduction...

  2. 1991-92 Annual Trapping Plan: Mark Twain National Wildlife Refuge, Clarence Cannon National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Trapping Plan for the 1991-1992 trapping season at Mark Twain and Clarence Cannon NWRs outlines rules and regulations for the trapping of beaver and...

  3. 1989-90 Annual Trapping Plan: Mark Twain National Wildlife Refuge, Clarence Cannon National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Trapping Plan for the 1989-90 trapping season at Mark Twain and Clarence Cannon NWRs outlines rules and regulations for the trapping of beaver and...

  4. 1990-91 Annual Trapping Plan: Mark Twain National Wildlife Refuge, Clarence Cannon National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Annual Trapping Plan for the 1990-91 trapping season at Mark Twain and Clarence Cannon NWRs outlines rules and regulations for the trapping of beaver and...

  5. Crescent Lake/North Platte National Wildlife Refuge Complex annual habitat management plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Crescent Lake/North Platte National Wildlife Refuge Complex Annual Habitat Management Plan provides a year long vision and specific guidance on managing habitats...

  6. Annual Report of 49-2 SPR Operation in 2012

    Institute of Scientific and Technical Information of China (English)

    ZHANG; Ya-dong; NIU; Sheng-li

    2012-01-01

    <正>1 Information of operation and production Operation person: present chief operators are 13 persons, operators are 4 persons; new chief operators are 3 persons, new operator is 1 person; training chief operators are 0 persons, training operators are 0 persons; transferred chief operator is 1 person; transferred operator is 0 person. Operation data:

  7. Health sector operational planning and budgeting processes in Kenya-"never the twain shall meet".

    Science.gov (United States)

    Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine

    2016-07-01

    Operational planning is considered an important tool for translating government policies and strategic objectives into day-to-day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top-down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local-level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd.

  8. Nez Perce Tribal Hatchery Complex; Operations and Maintenance and 2005 Annual Operation Plan, 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Harty, Harold R.; Lundberg, Jeffrey H.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-02-01

    The Nez Perce Tribal Hatchery (NPTH) responds directly to a need to mitigate for naturally-reproducing salmon in the Clearwater River subbasin. The overall goal is to produce and release fish that will survive to adulthood, spawn in the Clearwater River subbasin and produce viable offspring that will support future natural production and genetic integrity. Several underlying purposes of fisheries management will be maintained through this program: (1) Protect, mitigate, and enhance Columbia River subbasin anadromous fish resources. (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater River subbasin. (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project completion. (4) Sustain long-term fitness and genetic integrity of targeted fish populations. (5) Keep ecological and genetic impacts to non-target populations within acceptable limits. (6) Promote Nez Perce Tribal Management of Nez Perce Tribal hatchery Facilities and production areas within Nez Perce Treaty lands. Nez Perce Tribal Hatchery is a supplementation program that will rear and release spring, fall, and early-fall stocks of chinook salmon. Two life stages of spring chinook salmon will be released: parr and presmolts. Fall and early-fall chinook salmon will be released as subyearling smolts. The intent of NPTHC is to use conventional hatchery and Natural Rearing Enhancement Systems (NATURES) techniques to develop, increase and restore natural populations of spring and fall chinook salmon in the Clearwater River subbasin.

  9. Nez Perce Tribal Hatchery Complex; Operations and Maintenance and 2004 Annual Operation Plan, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Harty, Harold R.; Penney, Aaron K.; Larson, Roy Edward (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    The Nez Perce Tribal Hatchery (NPTH) responds directly to a need to mitigate for naturally-reproducing salmon in the Clearwater River subbasin. The overall goal is to produce and release fish that will survive to adulthood, spawn in the Clearwater River subbasin and produce viable offspring that will support future natural production and genetic integrity. Several underlying purposes of fisheries management will be maintained through this program: (1) Protect, mitigate, and enhance Columbia River subbasin anadromous fish resources. (2) Develop, reintroduce, and increase natural spawning populations of salmon within the Clearwater River subbasin. (3) Provide long-term harvest opportunities for Tribal and non-Tribal anglers within Nez Perce Treaty lands within four generations (20 years) following project completion. (4) Sustain long-term fitness and genetic integrity of targeted fish populations. (5) Keep ecological and genetic impacts to non-target populations within acceptable limits. (6) Promote Nez Perce Tribal Management of Nez Perce Tribal hatchery Facilities and production areas within Nez Perce Treaty lands. Nez Perce Tribal Hatchery is a supplementation program that will rear and release spring, fall, and early-fall stocks of chinook salmon. Two life stages of spring chinook salmon will be released: parr and presmolts. Fall and early-fall chinook salmon will be released as subyearling smolts. The intent of NPTHC is to use conventional hatchery and Natural Rearing Enhancement Systems (NATURES) techniques to develop, increase and restore natural populations of spring and fall chinook salmon in the Clearwater River subbasin.

  10. Microeconomics, Private Security, and the Significance to Operational Planning

    Science.gov (United States)

    2013-05-23

    MICROECONOMICS , PRIVATE SECURITY, AND THE SIGNIFICANCE TO OPERATIONAL PLANNING A Monograph by MAJ Kevin S. Clarke United... MICROECONOMICS , PRIVATE SECURITY, AND THE SIGNIFICANCE TO OPERATIONAL PLANNING 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER...of microeconomic principles of supply-demand theory by looking at specific conceptual variables to determine the relationship and influence on the

  11. Annual research plan, 1983-84. [Organic compounds derived from fossil substances

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-05-01

    The National Institute for Petroleum and Energy Research (NIPER) resulted from efforts by the Department of Energy (DOE) to ensure the continuity of the unique energy research capabilities that had been developed at the Bartlesville Energy Technology Center (BETC) over the past 65 years. This was accomplished by a Cooperative Agreement between DOE and IIT Research Institute (IITRI). The agreement to operate NIPER for the five fiscal years 1984-88 became effective October 1, 1983. The NIPER Annual Research Plan for 1983-84 consists of eight projects in the Base Program and 13 projects in the Optional Program. A sampling of potential Work for Others projects is also presented. The Base Program consists of five EOR and three Fundamental Petroleum Chemistry projects. The Optional Program has three EOR projects, one Unconventional Gas Recovery project, five APT projects, and four Advanced Utilization Research projects.

  12. 2005 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Parker River Refuge is currently developing a Habitat Management Plan, and expects a draft HMP by summer of 2006. The Refuge finalized a master plan in 1986;...

  13. Annual Water Management Plan White River National Wildlife Refuge 1991

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule...

  14. Annual Water Management Plan Wheeler National Wildlife Refuge 1997

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  15. Annual Water Management Plan Wheeler National Wildlife Refuge 1998

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  16. Annual Water Management Plan Wheeler National Wildlife Refuge 2000

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  17. Annual Water Management Plan Wheeler National Wildlife Refuge 1999

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Wheeler National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule of...

  18. Annual Water Management Plan White River National Wildlife Refuge 1990

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The White River National Wildlife Refuge Water Management Plan has been developed to meet the station objectives. The purpose of this plan is to establish a schedule...

  19. Running PILOT: operational challenges and plans for an Antarctic Observatory

    Science.gov (United States)

    McGrath, Andrew; Saunders, Will; Gillingham, Peter; Ward, David; Storey, John; Lawrence, Jon; Haynes, Roger

    2008-07-01

    We highlight the operational challenges and planned solutions faced by an optical observatory taking advantage of the superior astronomical observing potential of the Antarctic plateau. Unique operational aspects of an Antarctic optical observatory arise from its remoteness, the polar environment and the unusual observing cycle afforded by long continuous periods of darkness and daylight. PILOT is planned to be run with remote observing via satellite communications, and must overcome both limited physical access and data transfer. Commissioning and lifetime operations must deal with extended logistics chains, continual wintertime darkness, extremely low temperatures and frost accumulation amidst other challenging issues considered in the PILOT operational plan, and discussed in this presentation.

  20. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, H.T.

    1998-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP). This MAPAR provides a status on specific DARHT facility design- and construction-related mitigation actions that have been initiated in order to fulfill DOE`s commitments under the DARHT MAP. The functions of the DARHT MAP are to (1) document potentially adverse environmental impacts of the Phased Containment Option delineated in the Final EIS, (2) identify commitments made in the Final EIS and ROD to mitigate those potential impacts, and (3) establish Action Plans to carry out each commitment (DOE 1996). The DARHT MAP is divided into eight sections. Sections 1--5 provide background information regarding the NEPA review of the DARHT project and an introduction to the associated MAP. Section 6 references the Mitigation Action Summary Table which summaries the potential impacts and mitigation measures; indicates whether the mitigation is design-, construction-, or operational-related; the organization responsible for the mitigation measure; and the projected or actual completion data for each mitigation measure. Sections 7 and 8 discuss the Mitigation Action Plan Annual Report and Tracking System commitment and the Potential Impacts, Commitments, and Action Plans respectively. Under Section 8, potential impacts are categorized into five areas of concern: General Environment, including impacts to air and water; Soils, especially impacts affecting soil loss and contamination; Biotic Resources, especially impacts affecting threatened and endangered species; Cultural/Paleontological Resources, especially impacts affecting the archeological site known as Nake`muu; and Human Health and Safety, especially impacts pertaining to noise and radiation. Each potential impact includes a brief statement of the nature of the impact and its cause(s). The commitment

  1. 75 FR 70625 - Annual Funding Notice for Defined Benefit Plans

    Science.gov (United States)

    2010-11-18

    ... liabilities or assets for the year, as well as a projection to the end of such plan year of the effect of the... difficult to find meaning in the phrase ``a projection to the end of such year'' if ``current plan year'' is... service; an offer by the plan for a temporary period to permit participants to retire at benefit...

  2. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmon recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.

  3. Annual Report of 49-2 SPR Operation in 2013

    Institute of Scientific and Technical Information of China (English)

    WANG; Yi-wei; ZHANG; Ya-dong; YANG; Xiao; ZHU; Lei

    2013-01-01

    1 Information of operation and production Operation person:present chief operators are 12 persons,operators are 3 persons;new chief operators are 0 persons,new operator is 0 person;training chief operators are 0 persons,training operators

  4. SYSTEM PLANNING WITH THE HANFORD WASTE OPERATIONS SIMULATOR

    Energy Technology Data Exchange (ETDEWEB)

    CRAWFORD TW; CERTA PJ; WELLS MN

    2010-01-14

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  5. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  6. 30 CFR 784.23 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ..., land surveyor, with assistance from experts in related fields such as landscape architecture. ... caused by the proposed operations, if the facility or feature was shown under 30 CFR 783.24 and...

  7. Annual Habitat Work Plan Seatuck National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan outlines management activities that include forest protection, grassland management, wetland restoration, wildlife nesting structures, invasive vegetation...

  8. Sand and gravel mine operations and reclamation planning using microcomputers

    Energy Technology Data Exchange (ETDEWEB)

    Ariffin, J.B.

    1990-02-01

    The purpose of this study is to focus on the application of microcomputers, also known as personal computers, in planning for sand and gravel mine operations and reclamation at a site in Story County, Iowa. This site, called the Arrasmith Pit, is operated by Martin Marietta Aggregates, Inc. The Arrasmith site, which encompasses an area of about 25 acres, is a relatively small site for aggregate mining. However, planning for the concurrent mine operation and reclamation program at this site is just as critical as with larger sites and the planning process is the same.

  9. DETERMINING THE EDUCATION NEEDS OF TEACHERS IN THE PREPATION OF ANNUAL, UNITE AND DAILY PLANS

    Directory of Open Access Journals (Sweden)

    Gizem BAKAY

    2007-12-01

    Full Text Available This research prepared for establish teachers needs for prepare annual, unite and daily plan. Duringthe research, we use collage teachers and we prepared this survey for collect datas and to determine their needs. We use SPSSprograme with percentage tecnique (% for analyze datas. At the result, in this collage teachers need education for prepareannual and unite plans and they aren’t need any training for prepare daily plan

  10. Agricultural planning of annual plants under demand, maturation, harvest, and yield risk

    OpenAIRE

    Çömden, Nihan; Tan, Barış

    2012-01-01

    In this study we present a planning methodology for a firm whose objective is to match the random supply of annual premium fruits and vegetables from a number of contracted farms and the random demand from the retailers during the planning period. The supply uncertainty is due to the uncertainty of the maturation time, harvest time, and yield. The demand uncertainty is the uncertainty of weekly demand from the retailers. We provide a planning methodology to determine the farm areas and the se...

  11. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  12. SNL/CA Environmental Planning and Ecology Program Annual Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2007-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  13. Power Sources Planning,Construction and Operation

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    @@The year 2000 was a year when China's national economical and social development witnessed tremendous achievements, and China's electric power industry successfully realized the objectives set at the beginning of the year 2000. In 2000, the nationwide electricity generation fulfilled 1368.5 TWh, an increase of 10.975% on the basis of yearon-year; the newly commissioned generating capacity reached 20,553 MW. With annual newly commissioned generating capacity exceeding 10,000 MW consecutively for thirteen years, the nationwide total installed generating capacity hit 319,320.9 MW by the end of 2000, striding onto the new step of 300,000 MW. The nationwide total installed generating capacity and electricity generation and their mixes in 2000 are listed in Table 1.

  14. A planning concept incorporating the knowledge of both planning and operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, M.M.; Nepomuceno, L.; Teixeira, J.C.F.; Santos Junior, A. [Universidade Estadual de Campinas, SP (Brazil)

    1994-12-31

    In this paper, the electrical operation planning problem and the available technological possibilities for the improvement of planner`s work process are analyzed. The importance of the expert`s experience in efficient operation plans production is pointed out. The useful knowledge in planning and operating environments and their automation by Artificial Intelligence techniques are evaluated. Finally, conception of a decision-making support system allowing the interaction of storage expertise with analysis programs proposed, in order to improve the planning process. (author) 15 refs., 4 figs.

  15. Optimizing Long-Term Capital Planning for Special Operations Forces

    Science.gov (United States)

    2015-06-01

    portfolio. The goal of this thesis is to improve the LRCPT by developing proof-of- principle optimization models for long-range capital planning. We...Operations Forces (SOF) capability gaps in the future. This thesis presents three proof-of- principle long-range capital planning models designed to...RECOMMENDATIONS We formulated and analyzed three proof-of- principle optimization models for capital planning: the Binary Knapsack (BK) model, the

  16. 1997 Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  17. Setting the right incentives for global planning and operations

    NARCIS (Netherlands)

    Norde, Henk; Ozen, Ulas; Slikker, Marco

    2016-01-01

    We study incentive issues seen in a firm performing global planning and manufacturing, and local demand management. The stochastic demands in local markets are best observed by the regional business units, and the firm relies on the business units’ forecasts for planning of global manufacturing oper

  18. Operational workforce planning for check-in counters at airports

    DEFF Research Database (Denmark)

    Stolletz, Raik

    2010-01-01

    This paper addresses operation models for workforce planning for check-in systems at airports. We characterize different tasks of the hierarchical workforce planning problem with time-dependent demand. A binary linear programming formulation is developed for the fortnightly tour scheduling problem...

  19. Robust Planning for Effects-Based Operations

    Science.gov (United States)

    2006-06-01

    Force assets such as the Predator and Global Hawk 21 instead of the tactical uses of MAVs. The Air Force outlines its planning doctrine in Air Force...of UAVs. We have ISR UAVs (for example a Global Hawk), which we consider to be very good at performing ISR and have long range. We also model strike...ISR tasks per time-period for strike UAVs (A"isr) 2 ISR tasks per time-period for ISR UAVs (-y) 4 Figure 3-5. We solved the problem using Xpress Mosel

  20. Walla Walla River Fish Passage Operations Program, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2006-02-01

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2004-2005 project year, there were 590 adult summer steelhead, 31 summer steelhead kelts (Oncorhynchus mykiss), 70 adult bull trout (Salvelinus confluentus); 80 adult and 1 jack spring Chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway video counting window between December 13, 2004, and June 16, 2005. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. In addition, the old ladder trap was operated by ODFW in order to enumerate fish passage. Of the total, 143 adult summer steelhead and 15 summer steelhead kelts were enumerated at the west ladder at Nursery Bridge Dam during the video efforts between February 4 and May 23, 2005. Operation of the Little Walla Walla River

  1. Annual Habitat Work Plan Wertheim National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Management activities outlined in this plan include forest protection, grassland management, and wetland restoration, wildlife nesting structures and restoring...

  2. Annual Habitat Work Plan Conscience Point National Wildlife Refuge 2005

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan outlines the goals and objectives for management of the refuge’s grasslands and wetlands that includes the recovery effort for Sandplain Gerardia, the...

  3. 1995 Annual Water Management Plan : Muscatatuck National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The 1995 Water Management Plan for Muscatatuck NWR begins by summarizing the 1994 Water Management Program. Management results for moist soil units, green tree...

  4. Modoc National Wildlife Refuge annual water management plan 1981

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The content of this plan includes water source, existing water supplies, problems, resume of water management for 1980, recommended water management for 1981, and...

  5. Modoc National Wildlife Refuge annual water management plan 1982

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The content of this plan includes water source, existing water supplies, problems, resume of water management for 1981, recommended water management for 1982, and...

  6. Annual Habitat Work Plan Prime Hook National Wildlife Refuge 2014

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — AHWP describes the habitat and wildlife responses to management actions and weather conditions of 2013 and planned habitat management strategies, prescriptions and...

  7. Annual Habitat Work Plan Chincoteague National Wildlife Refuge 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This plan provides specific goals and objectives for how the refuge will manage its wetlands, beach, uplands, invasive species and artificial nesting.

  8. Annual Habitat Work Plan Prime Hook National Wildlife Refuge 2004

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is a plan that outlines working habitat objectives for wetland habitats based on refuge purposes, professional judgment and experience. Wetland objectives...

  9. 2008 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In 2006, Parker River NWR completed a Habitat Management Plan, which will guide the management of the wildlife and habitats on the Refuges for the next 15 years. The...

  10. 2009 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In 2006, Parker River NWR completed a Habitat Management Plan, which will guide the management of the wildlife and habitats on the Refuges for the next 15 years. The...

  11. Operation Eclipse; Appreciation and Outline Plan

    Science.gov (United States)

    1945-04-25

    operation will1 be .made at’ the first opportunity to the .responsible Local Allied llilitary Coriander . ’ Telecorxiunications Sj^stems closed dorm on...34; Droi/ision of POL, etc., of Specialist personnel viicn they arrive in G3RI.i’ii’’IY, will be under ta,ken by the local Ground Force Coriander until

  12. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  13. INTELLIGENCE CYCLE PLANNING IN MILITARY COALITION OPERATIONS

    Directory of Open Access Journals (Sweden)

    Catalin ANTON

    2015-04-01

    Full Text Available Abstract A long list of allied or coalition type military actions against entities declared as aggressors, failed or terrorist states/organizations has been recorded for the past 25 years. To reach an end state for any action planned by the military or established at any decagon making level, usually the political one, all information must be shared throughout all coalition/ allied components. That is mainly done by specialized elements that play the role of primary structures in charge of analyzing all information necessary for the military commander’s decision-making process. In this context, the article aims to outline the importance of the decision-making process for military commandants, as part of large /important coalition / allied structures and the level of training required of the latter to use the intelligence cycle to fulfill their main mission in their area of responsibility.

  14. Disruption management - operations research between planning and execution

    DEFF Research Database (Denmark)

    Clausen, Jens; Larsen, Jesper; Larsen, Allan

    2001-01-01

    For a large number of applications Operations Research has a proven track record: it can deliver high quality solutions for planning problems. Important examples can be found in the airline industry, logistics and production management. This report will describe real-world examples of a novel way...... of applying Operations Research: As plans have to be adjusted to take last minute changes into consideration, OR can play an active role in such a situation by producing, maybe even in a pro-actively role, alternative plans. This type of activity is called Disruption Management....

  15. Campaign Planning/Operational Art, Primer AY 07: Joint Advanced Warfighting School (JAWS) Joint Operation Planning Process

    Science.gov (United States)

    2007-01-01

    Counterintelligence; Civilian Internees CIA Central Intelligence Agency CIAP Command Intelligence Architecture Plan CID Criminal Investigation...MILGP Military Group (assigned to American Embassy in host nation) MIO Maritime Intercept Operations MIW Mine Warfare MLRS

  16. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to

  17. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to

  18. Cyber Defense Planning: Operating on Unconventional Terrain

    Science.gov (United States)

    2012-09-01

    envisioned. They’ll also discover (Continued on page 8) 7Army Communicator Figure 1 U. S. Cyber Command as the Tier 1 CND -SP Report Documentation Page...the Tier 1 CND - SP. As of late 2009, no COCOM other than USSTRATCOM had created their own CND -SP, instead hiring DISA as the CND - SP for their...headquarters’ cyber positions. This and many others decisions have lead to a situation where, unless CND -SP actions crossed into operational chan- nels

  19. The Philae Lander: Science planning and operations

    Science.gov (United States)

    Moussi, Aurélie; Fronton, Jean-François; Gaudon, Philippe; Delmas, Cédric; Lafaille, Vivian; Jurado, Eric; Durand, Joelle; Hallouard, Dominique; Mangeret, Maryse; Charpentier, Antoine; Ulamec, Stephan; Fantinati, Cinzia; Geurts, Koen; Salatti, Mario; Bibring, Jean-Pierre; Boehnhardt, Hermann

    2016-08-01

    Rosetta is an ambitious mission launched in March 2004 to study comet 67P/Churyumov-Gerasimenko. It is composed of a space probe (Rosetta) and the Philae Lander. The mission is a series of premieres: among others, first probe to escort a comet, first time a landing site is selected with short turnaround time, first time a lander has landed on a comet nucleus. In November 2014, once stabilized on the comet, Philae has performed its "First Science Sequence". Philae's aim was to perform detailed and innovative in-situ experiments on the comet's surface to characterize the nucleus by performing mechanical, chemical and physical investigations on the comet surface. The main contribution to the Rosetta lander by the French space agency (CNES) is the Science Operation and Navigation Center (SONC) located in Toulouse. Among its tasks is the scheduling of the scientific activities of the 10 lander experiments and then to provide it to the Lander Control Center (LCC) located in DLR Cologne. The teams in charge of the Philae activity scheduling had to cope with considerable constraints in term of energy, data management, asynchronous processes and co-activities or exclusions between instruments. Moreover the comet itself, its environment and the landing conditions remained unknown until separation time. The landing site was selected once the operational sequence was already designed. This paper will explain the specific context of the Rosetta lander mission and all the constraints that the lander activity scheduling had to face to fulfill the scientific objectives specified for Philae. A specific tool was developed by CNES and used to design the complete sequence of activities on the comet with respect to all constraints. The baseline scenario for the lander operation will also be detailed as well as the sequence performed on the comet to highlight the difficulties and challenges that the operational team faced.

  20. Campaign Planning for Peace Enforcement Operations

    Science.gov (United States)

    1994-05-17

    Security Council shall duly take account of failure to comply with such provisional measures . Article 41 The Security Council may decide what measures not...Disputes," gives the Security Council broad measures in which to encourage a peaceful settlement. 10 This chapter is the basis for UN PK operations...has been used independently (Libya, in 1986), and as a means to avoid the commitment of ground troops (Bosnia). This has its advntages , but one must

  1. Planning and Operation of Commercial Application Center

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Kim, Kye Ryung; Lee, Tae Joon; Lee, Jae Hyeong; Park, Je Won; Lee, Jae Sang

    2003-06-15

    The objectives of this R and D project are as follows : First, transferring developed technologies to outside companies and operating technology market to vitalize technology transactions, Second, developing commercial application projects to transfer technologies for commercial purposes and to solve interface problems in commercial applications, Third, enhancing commercial utilizations of developed accelerator and beam utilization technologies, Finally. preparing infra-structures for the development of over 30 venture- businesses based on achieved technologies through the Proton Engineering Frontier Project.

  2. Nevada Experiments and Operations Program (N Program) Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nattrass, L.; Anastasio, M.R.

    2000-02-01

    This plan briefly describes the Lawrence Livermore National Laboratory (LLNL) institutional structure and how Nevada Experiments and Operations Program (N Program's) organization fits within this structure, roles and responsibilities, and management processes that govern N Program activities. This plan also serves as the Integrated Safety Management (ISM) Implementation Plan for N Program work. This plan applies to all work performed by and for LLNL that falls under the oversight of DOE/NV except LLNL activities in support of the Yucca Mountain Project Office (YMPO).

  3. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    Energy Technology Data Exchange (ETDEWEB)

    Richard P. Wells

    2007-03-23

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year.

  4. 36 CFR 9.37 - Plan of operations approval.

    Science.gov (United States)

    2010-07-01

    ..., natural catastrophe, acts of God, etc., for inspection shall not be included when computing either this... determination regarding the impact of this operation and cumulative impacts of all proposed and existing... Preservations Act of 1966 as implemented by 36 CFR part 800. (f) Approval of each plan of operations...

  5. 22 CFR Appendix I to Part 211 - Operational Plan

    Science.gov (United States)

    2010-04-01

    ... should cover enough time for a program to become fully operational and to permit evaluation of its... shall be transmitted to the CCC.) F. Local Currency Programs (Public Law 480, Title II Section 203... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Operational Plan I Appendix I to Part...

  6. Enhancing Cassini Operations & Science Planning Tools

    Science.gov (United States)

    Castello, Jonathan

    2012-01-01

    The Cassini team uses a variety of software utilities as they manage and coordinate their mission to Saturn. Most of these tools have been unchanged for many years, and although stability is a virtue for long-lived space missions, there are some less-fragile tools that could greatly benefit from modern improvements. This report shall describe three such upgrades, including their architectural differences and their overall impact. Emphasis is placed on the motivation and rationale behind architectural choices rather than the final product, so as to illuminate the lessons learned and discoveries made.These three enhancements included developing a strategy for migrating Science Planning utilities to a new execution model, rewriting the team's internal portal for ease of use and maintenance, and developing a web-based agenda application for tracking the sequence of files being transmitted to the Cassini spacecraft. Of this set, the first two have been fully completed, while the agenda application is currently in the early prototype stage.

  7. Savannah River Site Approved Site Treatment Plan, 1998 Annual Update

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B.

    1999-04-20

    The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  8. Savannah River Site approved site treatment plan, 2000 annual update

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B.

    2000-04-20

    The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

  9. Application of Grid Planning Method in Drilling-Blasting Operations

    OpenAIRE

    Dambov, Risto; Spasovski, Orce

    2012-01-01

    The problem occurs almost every day in operation and causes troubles to mining engineers. The right performance of drilling-blasting work is important for the successful operation of the entire excavation. The aim of the paper is to point out the importance of planning and how it can contribute to the right organization and make drilling-blasting and other mining activities in mine operations easier. Defining the activities and practical example that has been given are carried out by the u...

  10. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  11. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  12. Electric power annual 1994. Volume 2, Operational and financial data

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-28

    This year, the annual is published in two volumes. Volume I focused on US electric utilities and contained final 1994 data on net generation, fossil fuel consumption, stocks, receipts, and cost. This Volume II presents annual 1994 summary statistics for the electric power industry, including information on both electric utilities and nonutility power producers. Included are preliminary data for electric utility retail sales of electricity, associated revenue, and average revenue per kilowatthour of electricity sold (based on form EIA-861) and for electric utility financial statistics, environmental statistics, power transactions, and demand- side management. Final 1994 data for US nonutility power producers on installed capacity and gross generation, as well as supply and disposition information, are also provided in Volume II. Technical notes and a glossary are included.

  13. Health planning for remote petrochemical field operations

    Energy Technology Data Exchange (ETDEWEB)

    Krieger, G.R.; Balge, M.Z.

    1995-12-31

    Occupational/Public Health Services are becoming increasingly required in projects that involve the extended presence of expatriates in remote underdeveloped areas of the world. These ``expats`` are defined as individuals living and working in the environment who are not indigenous to the area. Under this definition, workers who are resistant to a ``local`` strain of malaria and then relocate to another geographic within the same country can also be considered as ``biologic expatriates`` since their resistance profile for certain tropical diseases is not reflective of their new environment. Unlike a major infrastructure project in the industrialized world, project planners in remote areas of the developing world should be expected to make significant long term medical and environmental commitments. US companies have extensive experience in the business of large-scale development projects, e.g. oil and gas pipelines and well field development; however, these projects represent major long-term in-country commitments with potentially large labor forces and substantial and sustained impacts on local health and safety resources. The initial structuring of health and safety programs will, therefore, have long-term ramifications on the project both during construction and ``routine`` operations since the multi-national companies are increasingly expected to develop and maintain self-sustaining health, safety and environmental programs.

  14. A dynamic programming model for optimal planning of aquifer storage and recovery facility operations

    Science.gov (United States)

    Uddameri, V.

    2007-01-01

    Aquifer storage recovery (ASR) is an innovative technology with the potential to augment dwindling water resources in regions experiencing rapid growth and development. Planning and design of ASR systems requires quantifying how much water should be stored and appropriate times for storage and withdrawals within a planning period. A monthly scale planning model has been developed in this study to derive optimal (least cost) long-term policies for operating ASR systems and is solved using a recursive deterministic dynamic programming approach. The outputs of the model include annual costs of operation, the amount of water to be imported each month as well as the schedule for storage and extraction. A case study modeled after a proposed ASR system for Mustang Island and Padre Island service areas of the city of Corpus Christi is used to illustrate the utility of the developed model. The results indicate that for the assumed baseline demands, the ASR system is to be kept operational for a period of 4 months starting from May through August. Model sensitivity analysis indicated that increased seasonal shortages can be met using ASR with little additional costs. For the assumed cost structure, a 16% shortage increased the costs by 1.6%. However, the operation time of ASR increased from 4 to 8 months. The developed dynamic programming model is a useful tool to assess the feasibility of evaluating the use of ASR systems during regional-scale water resources planning endeavors.

  15. 5 CFR 2638.706 - Agency's written plan for annual ethics training.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Agency's written plan for annual ethics training. 2638.706 Section 2638.706 Administrative Personnel OFFICE OF GOVERNMENT ETHICS GOVERNMENT ETHICS OFFICE OF GOVERNMENT ETHICS AND EXECUTIVE AGENCY ETHICS PROGRAM RESPONSIBILITIES Executive Agency...

  16. Tool for Military Logistics Planning of Peace Support Operations: The OTAS Planning Tool

    NARCIS (Netherlands)

    Merrienboer, S.A. van

    1998-01-01

    Within the research group Operations Research Studies Army of the TNO Physics and Electronics Laboratory the OTAS planning tool is developed for the Royal Netherlands Armed Forces. This paper gives a general and brief description of the tool.

  17. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1990-01-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing

  18. Operational planning of refineries; Planejamento operacional de refinarias

    Energy Technology Data Exchange (ETDEWEB)

    Sinay, Maria Cristina Fogliatti de [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil); Bueno, Catia [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    The activities integration that compose the petroleum logistic chain makes more complex its planning which is normally done in a joined level, using operation research models in order to find optimized solutions. When this integrated planning is repassed to the companies and its constitutes parts (mainly refinery) uncertainness are generated about the solution that will be adopted in case of new restrictions appear. Then, the purpose of this work is propose a procedure that is capable to adequate and specifies optimized solutions presented by corporative model to refinery operations, using 'What-if' and deterministic simulation technique with optimization. To achieve this objective will be analysed typical activities in refineries and basic principles to their operational planning. (author)

  19. The United States national volcanic ash operations plan for aviation

    Science.gov (United States)

    Albersheim, Steven; Guffanti, Marianne

    2009-01-01

    Volcanic-ash clouds are a known hazard to aviation, requiring that aircraft be warned away from ash-contaminated airspace. The exposure of aviation to potential hazards from volcanoes in the United States is significant. In support of existing interagency operations to detect and track volcanic-ash clouds, the United States has prepared a National Volcanic Ash Operations Plan for Aviation to strengthen the warning process in its airspace. The US National Plan documents the responsibilities, communication protocols, and prescribed hazard messages of the Federal Aviation Administration, National Oceanic and Atmospheric Administration, US Geological Survey, and Air Force Weather Agency. The plan introduces a new message format, a Volcano Observatory Notice for Aviation, to provide clear, concise information about volcanic activity, including precursory unrest, to air-traffic controllers (for use in Notices to Airmen) and other aviation users. The plan is online at http://www.ofcm.gov/p35-nvaopa/pdf/FCM-P35-2007-NVAOPA.pdf. While the plan provides general operational practices, it remains the responsibility of the federal agencies involved to implement the described procedures through orders, directives, etc. Since the plan mirrors global guidelines of the International Civil Aviation Organization, it also provides an example that could be adapted by other countries.

  20. Annual Report of Radioactive Waste Facilities Operation in 2013

    Institute of Scientific and Technical Information of China (English)

    DU; Hong-ming; GAO; Zhi-gang; LIU; Fu-guo

    2013-01-01

    301,a section of Department of Radiochemistry,which manages 15 facilities and undertakes the administrative tasks of radioactive waste,is the important guarantee of scientific research production and safety in CIAE.1 The safe operation of the radioactive waste management facilities In 2013,in order to ensure the operation safety,we formulated the inspection regulations,which included regular operation inspection,week safety inspection from the leaders of the section and

  1. Planning of operation & maintenance using risk and reliability based methods

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Operation and maintenance (OM) of offshore wind turbines contributes with a substantial part of the total levelized cost of energy (LCOE). The objective of this paper is to present an application of risk- and reliability-based methods for planning of OM. The theoretical basis is presented...... and illustrated by an example, namely for planning of inspections and maintenance of wind turbine blades. A life-cycle approach is used where the total expected cost in the remaining lifetime is minimized. This maintenance plan is continuously updated during the lifetime using information from previous...... inspections and from condition monitoring with time intervals between inspections and maintenance / repair options as the decision parameters....

  2. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    Science.gov (United States)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  3. UMTS network planning, optimization, and inter-operation with GSM

    CERN Document Server

    Rahnema, Moe

    2008-01-01

    UMTS Network Planning, Optimization, and Inter-Operation with GSM is an accessible, one-stop reference to help engineers effectively reduce the time and costs involved in UMTS deployment and optimization. Rahnema includes detailed coverage from both a theoretical and practical perspective on the planning and optimization aspects of UMTS, and a number of other new techniques to help operators get the most out of their networks. Provides an end-to-end perspective, from network design to optimizationIncorporates the hands-on experiences of numerous researchersSingle

  4. Annualized TASAR Benefit Estimate for Alaska Airlines Operations

    Science.gov (United States)

    Henderson, Jeffrey

    2015-01-01

    The Traffic Aware Strategic Aircrew Request (TASAR) concept offers onboard automation for the purpose of advising the pilot of traffic compatible trajectory changes that would be beneficial to the flight. A fast-time simulation study was conducted to assess the benefits of TASAR to Alaska Airlines. The simulation compares historical trajectories without TASAR to trajectories developed with TASAR and evaluated by controllers against their objectives. It was estimated that between 8,000 and 12,000 gallons of fuel and 900 to 1,300 minutes could be saved annually per aircraft. These savings were applied fleet-wide to produce an estimated annual cost savings to Alaska Airlines in excess of $5 million due to fuel, maintenance, and depreciation cost savings. Switching to a more wind-optimal trajectory was found to be the use case that generated the highest benefits out of the three TASAR use cases analyzed. Alaska TASAR requests peaked at four to eight requests per hour in high-altitude Seattle center sectors south of Seattle-Tacoma airport.

  5. Marine radioecology. Annual report 1996. Project plan 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The project plan for the EKO-1 project states that `the main aim of the EKO-1 project is to enable faster and better assessments to be made of the effects of releases of radionuclides into the marine environment`. To meet this goal the main parts of the project were defined as follows: Model work - Identifying parameters of main interest including estimating and validating the values of these parameters; Research - Field studies, environments typical for various Nordic regions, environments with special physical or chemical characteristics. Laboratory studies; Dissemination of information - Seminars, reports, articles. During the project period emphasis has also been put on quality issues concerning sampling and analysis. The project work has progressed in accordance with project plans in 1996 and within the set budget. In modelling a parameter sensitivity analysis was carried out for a radiological assessment model used for the prediction of doses to man from dumping of radioactive waste in the Kara Sea. Doses to man were found to be generally dominated by contributions from long-lived transuranic radionuclides (plutonium and americium) which associate readily with sediments. Sediment related processes and parameters show therefore high sensitivities, especially at long distances (e.g. Barents Sea). Within the EKO-1 project there has been emphasis on encouraging the Nordic aspect of sediment research in spite of the limitations set by nationally run sampling projects. The EKO-1 project has managed this by e.g.: Organizing exchange of samples for analysis links with the EKO-2.3 project (`Limnic systems`). (EG) 52 refs.

  6. Liquid and Gaseous Waste Operations Project Annual Operating Report CY 1999

    Energy Technology Data Exchange (ETDEWEB)

    Maddox, J.J.; Scott, C.B.

    2000-03-01

    A total of 5.77 x 10 7 gallons (gal) of liquid waste was decontaminated by the Process Waste Treatment Complex (PWTC) - Building 3544 ion exchange system during calendar year (CY) 1999. This averaged to 110 gpm throughout the year. An additional 3.94 x 10 6 gal of liquid waste (average of 8 gpm throughout the year) was decontaminated using the zeolite treatment system due to periods of high Cesium levels in the influent wastewater. A total of 6.17 x 10 7 gal of liquid waste (average of 118 gpm throughout the year) was decontaminated at Building 3544 during the year. During the year, the regeneration of the ion exchange resins resulted in the generation of 8.00 x 10 3 gal of Liquid Low-Level Waste (LLLW) concentrate and 9.00 x 10 2 gal of LLLW supernate. See Table 1 for a monthly summary of activities at Building 3544. Figure 1 shows a diagram of the Process Waste Collection and Transfer System and Figure 2 shows a diagram of the Building 3544 treatment process. Figures 3, 4 5, and 6 s how a comparison of operations at Building 3544 in 1997 with previous years. Figure 7 shows a comparison of annual rainfall at Oak Ridge National Laboratory (ORNL) since 1995.

  7. Annual Sustainability Report FY 2014. Incorporates NREL Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rukavina, Frank [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-07-01

    NREL's Sustainability Program is responsible for upholding all executive orders, federal regulations, U.S. Department of Energy (DOE) orders, and goals related to sustainable and resilient facility operations. But NREL continues to expand sustainable practices above and beyond the laboratory's regulations and requirements to ensure that the laboratory fulfills its mission into the future, leaves the smallest possible legacy footprint, and models sustainable operations and behaviors on national, regional, and local levels. The report, per the GRI reporting format, elaborates on multi-year goals relative to executive orders, achievements, and challenges; and success stories provide specific examples. A section called 'Sustaining NREL's Future Through Integration' provides insight into how NREL is successfully expanding the adoption of renewable energy technologies through integration.

  8. Orbital Express mission operations planning and resource management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-04-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less labor-power rises. Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Like a tow-truck delivering gas to a car on the road, the "servicing" satellite of OE had to find the "client" from several kilometers away, connect directly to the client, and transfer fluid (or a battery) autonomously, while on earth-orbit. The mission met 100% of its success criteria, and proved that autonomous satellite servicing is now a reality for space operations. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. As the constraints for execution could change weekly, daily, and even hourly, the tools used create the mission execution plans needed to be flexible and adaptable to many different kinds of changes. At the same time, the hard constraints of the plans needed to be maintained and satisfied. The Automated Scheduling and Planning Environment (ASPEN) tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, an overview of the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the NASA's Earth Observing One mission's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  9. Operational research models in warehouse design and planning

    OpenAIRE

    Geraldes, Carla A. S.; Carvalho, Sameiro; Pereira, Guilherme

    2010-01-01

    The design and operation of a warehouse involve many challenging decision problems. In this paper, a literature review on warehousing models is presented. Authors start with a hierarchy of decision problems encountered in setting up warehouse design and planning processes. Next, some operational research decision models and solution algorithms supporting decision making at each discussed level are presented. The aim is to link academic researchers and warehouse practitioners, explaining what ...

  10. Capacity planning in operations producing heavy plate cut shapes

    Directory of Open Access Journals (Sweden)

    R. Lenort

    2009-07-01

    Full Text Available The present approach to capacity planning in operations producing heavy metal shapes causes problems in fulfilling the required financial and volume indexes in production, as well as in meeting the work order completion dates. The article represents the methodology for optimal production scheduling in operations producing heavy plate cut shapes, which significantly eliminates the above-mentioned problems. The methodology is based on the application Generalized Assignment Problem (GAP.

  11. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.

  12. The CONSERT operations planning process for the Rosetta mission

    Science.gov (United States)

    Rogez, Yves; Puget, Pascal; Zine, Sonia; Hérique, Alain; Kofman, Wlodek; Altobelli, Nicolas; Ashman, Mike; Barthélémy, Maud; Biele, Jens; Blazquez, Alejandro; Casas, Carlos M.; Sitjà, Marc Costa; Delmas, Cédric; Fantinati, Cinzia; Fronton, Jean-François; Geiger, Bernhard; Geurts, Koen; Grieger, Björn; Hahnel, Ronny; Hoofs, Raymond; Hubault, Armelle; Jurado, Eric; Küppers, Michael; Maibaum, Michael; Moussi-Souffys, Aurélie; Muñoz, Pablo; O'Rourke, Laurence; Pätz, Brigitte; Plettemeier, Dirk; Ulamec, Stephan; Vallat, Claire

    2016-08-01

    The COmet Nucleus Sounding Experiment by Radio wave Transmission (CONSERT / Rosetta) has been designed to sound the interior of the comet 67P/Churyumov-Gerasimenko. This instrument consists of two parts: one onboard Rosetta and the other one onboard Philae. A good CONSERT science measurement sequence requires joint operations of both spacecrafts in a relevant geometry. The geometric constraints to be fulfilled involve the position and the orientation of both Rosetta and Philae. At the moment of planning the post-landing and long-term science operations for Rosetta instruments, the actual comet shape and the landing location remained largely unknown. In addition, the necessity of combining operations of Rosetta spacecraft and Philae spacecraft makes the planning process for CONSERT particularly complex. In this paper, we present the specific methods and tools we developed, in close collaboration with the mission and the science operation teams for both Rosetta and Philae, to identify, rank and plan the operations for CONSERT science measurements. The presented methods could be applied to other missions involving joint operations between two platforms, on a complex shaped object.

  13. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    Science.gov (United States)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  14. Operations of and Future Plans for the Pierre Auger Observatory

    CERN Document Server

    Abraham, J; Aglietta, M; Aguirre, C; Ahn, E J; Allard, D; Allekotte, I; Allen, J; Alvarez-Muñiz, J; Ambrosio, M; Anchordoqui, L; Andringa, S; Anzalone, A; Aramo, C; Arganda, E; Argirò, S; Arisaka, K; Arneodo, F; Arqueros, F; Asch, T; Asorey, H; Assis, P; Aublin, J; Ave, M; Avila, G; Bäcker, T; Badagnani, D; Barber, K B; Barbosa-Ademarlaudo, F; Barroso, S L C; Baughman, B; Bauleo, P; Beatty, J J; Beau, T; Becker, B R; Becker, K H; Bellétoile, A; Bellido, J A; BenZvi, S; Bérat, C; Bernardini, P; Bertou, X; Biermann, P L; Billoir, P; Blanch-Bigas, O; Blanco, F; Bleve, C; Blümer, H; Boháčová, M; Boncioli, D; Bonifazi, C; Bonino, R; Borodai, N; Brack, J; Brogueira, P; Brown, W C; Bruijn, R; Buchholz, P; Bueno, A; Burton, R E; Busca, N G; Caballero-Mora, K S; Caramete, L; Caruso, R; Carvalho, W; Castellina, A; Catalano, O; Cazon, L; Cester, R; Chauvin, J; Chiavassa, A; Chinellato, J A; Chou, A; Chudoba, J; Chye, J; Clay, R W; Colombo, E; Conceição, R; Connolly, B; Contreras, F; Coppens, J; Cordier, A; Cotti, U; Coutu, S; Covault, C E; Creusot, A; Criss, A; Cronin, J; Curutiu, A; agoret-Campagne, S; Dallier, R; Daumiller, K; Dawson, B R; de Almeida, R M; De Domenico, M; De Donato, C; De Jong, S J; De La Vega, G; Junior, W J M de Mello; Neto, J R T de Mello; De Mitri, I; De Souza, V; de Vries, K D; Decerprit, G; Del Peral, L; Deligny, O; Della Selva, A; Fratte, C Delle; Dembinski, H; DiGiulio, C; Diaz, J C; Diep, P N; Dobrigkeit, C; D'Olivo, J C; Dong, P N; Dorofeev, A; Anjos, J C dos; Dova, M T; D'Urso, D; Dutan, I; Duvernois, M A; Engel, R; Erdmann, M; Escobar, C O; Etchegoyen, A; Luis, P Facal San; Falcke, H; Farrar, G; Fauth, A C; Fazzini, N; Ferrer, F; Ferrero, A; Fick, B; Filevich, A; Filipčič, A; Fleck, I; Fliescher, S; Fracchiolla, C E; Fraenkel, E D; Fulgione, W; Gamarra, R F; Gambetta, S; García, B; GarcíaGámez, D; Garcia-Pinto, D; Garrido, X; Gelmini, G; Gemmeke, H; Ghia, P L; Giaccari, U; Giller, M; Glass, H; Goggin, L M; Gold, M S; Golup, G; Albarracin, F Gomez; Berisso, M Gómez; Gonçalves, P; Amaral, M Gonçalves do; González, D; Gonzalez, J G; Góra, D; Gorgi, A; Gouffon, P; Gozzini, S R; Grashorn, E; Grebe, S; Grigat, M; Grillo, A F; Guardincerri, Y; Guarino, F; Guedes, G P; Gutiérrez, J; Hague, J D; Halenka, V; Hansen, P; Harari, D; Harmsma, S; Harton, J L; Haungs, A; Healy, M D; Hebbeker, T; Hebrero, G; Heck, D; Holmes, V C; Homola, P; Hörandel, J R; Horneffer, A; Hrabovský, M; Huege, T; Hussain, M; Iarlori, M; Insolia, A; Ionita, F; Italiano, A; Jiraskova, S; Kaducak, M; Kampert, K H; Karova, T; Kasper, P; Kégl, B; Keilhauer, B; Kemp, E; Kieckhafer, R M; Klages, H O; Kleifges, M; Kleinfeller, J; Knapik, R; Knapp, J; Koang, D -H; Krieger, A; Krömer, O; Kruppke-Hansen, D; Kühn, F; Kuempel, D; Kulbartz, K; Kunka, N; Kusenko, A; LaRosa, G; Lachaud, C; Lago, B L; Lautridou, P; Leão, M S A B; Lebrun, D; Lebrun, P; Lee, J; de Oliveira, M A Leigui; Lemiere, A; Letessier-Selvon, A A; Leuthold, M; Lhenry-Yvon, I; López, R; Agüera, A Lopez; Louedec, K; Bahilo, J Lozano; Lucero, A; Lyberis, H; Maccarone, M C; Macolino, C; Maldera, S; Mandat, D; Mantsch, P; Mariazzi, A G; Maris, I C; Falcon, H R Marquez; Martello, D; Bravo, O Martínez; Mathes, H J; Matthews, J; Matthews, J A J; Matthiae, G; Maurizio, D; Mazur, P O; McEwen, M; McNeil, R R; Medina-Tanco, G; Melissas, M; Melo, D; Menichetti, E; Menshikov, A; Meyhandan, R; Micheletti, M I; Miele, G; Miller, W; Miramonti, L; Mollerach, S; Monasor, M; Ragaigne, D Monnier; Montanet, F; Morales, B; Morello, C; Moreno, J C; Morris, C; Mostafá, M; Moura, C A; Müller, S; Muller, M A; Mussa, R; Navarra, G; Navarro, J L; Navas, S; Necesal, P; Nellen, L; Newman-Holmes, C; Newton, D; Nhung, P T; Nierstenhoefer, N; Nitz, D; Nosek, D; Nožka, L; Nyklicek, M; Oehlschläger, J; Olinto, A; Oliva, P; Olmos-Gilbaja, V M; Ortiz, M; Pacheco, N; Selmi-Dei, D Pakk; Palatka, M; Pallotta, J; Parente, G; Parizot, E; Parlati, S; Pastor, S; Patel, M; Paul, T; Pavlidou, V; Payet, K; Pech, M; Pȩkala, J; Pepe, I M; Perrone, L; Pesce, R; Petermann, E; Petrera, S; Petrinca, P; Petrolini, A; Petrov, Y; Petrovic, J; Pfendner, C; Piegaia, R; Pierog, T; Pimenta, M; Pinto, T; Pirronello, V; Pisanti, O; Platino, M; Pochon, J; Ponce, V H; Pontz, M; Privitera, P; Prouza, M; Quel, E J; Rautenberg, J; Ravel, O; Ravignani, D; Redondo, A; Revenu, B; Rezende, F A S; Rídky, J; Riggi, S; Risse, M; Rivière, C; Rizi, V; Robledo, C; Rodríguez, G; Martino, J Rodriguez; Rojo, J Rodriguez; Rodriguez-Cabo, I; Rodríguez-Frías, M D; Ros, G; Rosado, J; Rossler, T; Roth, M; Rouillé-d'Orfeuil, B; Roulet, E; Rovero, A C; Salamida, F; Salazar, H; Salina, G; Sánchez, F; Santander, M; Santo, C E; Santos, E M; Sarazin, F; Sarkar, S; Sato, R; Scharf, N; Scherini, V; Schieler, H; Schiffer, P; Schmidt, A; Schmidt, F; Schmidt, T; Scholten, O; Schoorlemmer, H; Schovancova, J; Schovánek, P; Schroeder, F; Schulte, S; Schüssler, F; Schuster, D; Sciutto, S J; Scuderi, M; Segreto, A; Semikoz, D; Settimo, M; Shellard, R C; Sidelnik, I; Siffert, B B; Sigl, G; Śmiałkowski, A; Šmída, R; Smith, B E; Snow, G R; Sommers, P; Sorokin, J; Spinka, H; Squartini, R; Strazzeri, E; Stutz, A; Suárez, F; Suomijärvi, T; Supanitsky, A D; Sutherland, M S; Swain, J; Szadkowski, Z; Tamashiro, A; Tamburro, A; Tarutina, T; Taşcuau, O; Tcaciuc, R; Tcherniakhovski, D; Tegolo, D; Thao, N T; Thomas, D; Ticona, R; Tiffenberg, J; Timmermans, C; Tkaczyk, W; Peixoto, C J Todero; Tomé, B; Tonachini, A; Torres, I; Travnicek, P; Tridapalli, D B; Tristram, G; Trovato, E; Tueros, M; Ulrich, R; Unger, M; Urban, M; Galicia, J F Valdés; Valiño, I; Valore, L; VandenBerg, A M; Vázquez, J R; Vázquez, R A; Veberič, D; Velarde, A; Venters, T; Verzi, V; Videla, M; Villaseñor, L; Vorobiov, S; Voyvodic, L; Wahlberg, H; Wahrlich, P; Wainberg, O; Warner, D; Watson, A A; Westerhoff, S; Whelan, B J; Wieczorek, G; Wiencke, L; Wilczyńska, B; Wilczyński, H; Wileman, C; Winnick, M G; Wu, H; Wundheiler, B; Yamamoto, T; Younk, P; Yuan, G; Yushkov, A; Zas, E; Zavrtanik, D; Zavrtanik, M; Zaw, I; Zepeda, A; Ziolkowski, M

    2009-01-01

    Technical reports on operations and features of the Pierre Auger Observatory, including ongoing and planned enhancements and the status of the future northern hemisphere portion of the Observatory. Contributions to the 31st International Cosmic Ray Conference, Lodz, Poland, July 2009.

  15. An Analysis of Current Operational Contract Support Planning Doctrine

    Science.gov (United States)

    2015-09-01

    analysis of doctrine and planning assets . The activities include interviews with various contracting and logistics professionals. F. RESEARCH...doctrine typically neglects the tangible and intangible capabilities that using OCS in missions brings to the operational and combatant commander. While... measuring the maturity of a process in practice within an organization through the issuing of surveys and measuring the responses. The model used

  16. Educational Trends Shaping School Planning, Design, Construction, Funding and Operation

    Science.gov (United States)

    Stevenson, Kenneth R.

    2010-01-01

    What does the future hold for educators and facilities professionals when it comes to planning, building, funding, and operating school facilities? No one can absolutely know beforehand. However, there are many, many indicators of where public education in the United States may well be destined. These indicators take the form of already occurring…

  17. Test plans of the high temperature test operation at HTTR

    Energy Technology Data Exchange (ETDEWEB)

    Sakaba, Nariaki; Nakagawa, Shigeaki; Takada, Eiji [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment] [and others

    2003-03-01

    HTTR plans a high temperature test operation as the fifth step of the rise-to-power tests to achieve a reactor outlet coolant temperature of 950 degrees centigrade in the 2003 fiscal year. Since HTTR is the first HTGR in Japan which uses coated particle fuel as its fuel and helium gas as its coolant, it is necessary that the plan of the high temperature test operation is based on the previous rise-to-power tests with a thermal power of 30 MW and a reactor outlet coolant temperature at 850 degrees centigrade. During the high temperature test operation, reactor characteristics, reactor performances and reactor operations are confirmed for the safety and stability of operations. This report describes the evaluation result of the safety confirmations of the fuel, the control rods and the intermediate heat exchanger for the high temperature test operation. Also, problems which were identified during the previous operations are shown with their solution methods. Additionally, there is a discussion on the contents of the high temperature test operation. As a result of this study, it is shown that the HTTR can safely achieve a thermal power of 30 MW with the reactor outlet coolant temperature at 950 degrees centigrade. (author)

  18. Space Station assembly sequence planning - An engineering and operational challenge

    Science.gov (United States)

    Kaidy, James T.; Bastedo, William G.

    1988-01-01

    This paper discusses the Space Station assembly sequence planning and development process. It presents the planning methodologies from both historial and current perspectives. It is shown that planning the assembly sequence is a new and unique challenge and its solution requires the simultaneous satisfaction of many diverse variables and constants. The considerations which influence the development of the assembly sequence include launch vehicle integration and lift capabilities, on-orbit assembly flight operations, vehicle flight dynamics, spacecraft system capabilities and resource availability. Many of these considerations are described in this paper. In addition, the examples presented demonstrate the current process for assembly sequence planning and show many of the complex trade-offs that must be performed.

  19. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  20. Phase Zero Contracting Operations (PZCO) -- Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2012-05-02

    Tier Model ( TTM ) ........................... 15  A.  Credentialed Contract Planners Integrated with Operations Planners...Planners The Three-tier Model ( TTM ) was published to address the challenges inherent in contracting in complex military operations (Yoder, 2004). The...Contingency Contracting, Expeditionary Contracting, Humanitarian Aid, Disaster Relief, Advanced Planning, Three-tier Model , YTTM, APEX, JOPES, JCASO

  1. Application of reliability worth concepts in power system operational planning

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J.C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Silva, A.M. Leite da [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Pereira, M.V.F. [Power System Research (PSR), Inc., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work describes the application of a new methodology for calculating total system interruption costs in power system operational planning. Some important operational aspects are discussed: chronological load curves, customer damage functions for each consumer class, maintenance scheduling and non-exponential repair times. It is also presented the calculation of the probability distribution of the system interruption cost to improve the decision making process associated with alternative operational strategies. The Brazilian Southeastern system is used to illustrate all previous applications. (author) 24 refs., 8 figs., 4 tabs.

  2. Liquid and Gaseous Waste Operations Department annual operating report, CY 1992

    Energy Technology Data Exchange (ETDEWEB)

    Gillespie, M.A.; Maddox, J.J.; Scott, C.B.

    1993-03-01

    A total of 6.05 x 10{sup 7} gal of liquid waste was decontaminated by the Process Waste Treatment Plant (PWTP) ion exchange system during CY 1992. This averaged to 115 gpm throughout the year. When necessary, a wastewater sidestream of 50--80 gpm was treated through the use of a natural zeolite treatment system. An additional 8.00 x 10{sup 6} gal (average of 15 gpm throughout the year) were treated by the zeolite system. Therefore, the average total flow treated at the PWTP for CY 1992 was 130 gpm. In mid-June, the zeolite system was repiped to allow it the capability to treat the ion exchange system`s discharge due to rising Cs problems in the wastewater. While being used to treat the ion exchange system`s discharge, it cannot treat a sidestream of wastewater. During the year, the regeneration of the cation exchange resins resulted in the generation of 7.83 x 10{sup 3} gal of liquid low-level waste (LLLW) concentrate and 1.15 x 10{sup 4} gal of LLLW evaporator feed. The head-end softening process (precipitation/clarification) generated 604 drums (4.40 x 10{sup 3} ft{sup 3}) of solid low-level waste sludge. The zeolite treatment system generated approximately 8.40 x 10{sup 2} ft{sup 3} of spent zeolite resin, which was turned over to the Solid Waste Operations Department for disposal. See Table 1 for a monthly summary of activities at the PWTP. Figures 1, 2, 3, and 4 show a comparison of operations at the PWTP in 1992 with previous years. Figure 5 shows a comparison of annual rainfall at Oak Ridge National Laboratory (ORNL) since 1987. A total of 1.55 x 10{sup 8} gal of liquid waste (average of 294 gpm throughout the year) was treated at the Nonradiological Wastewater Treatment Plant (NRWTP). Of this amount, 1.40 x 10{sup 7} gal were treated by the precipitation/clarification process for removal of heavy metals. Twenty-five boxes (1.60 x 10{sup 3} ft{sup 3}) of solid sludge generated by the precipitation/clarification process were removed from the filter press room.

  3. Liquid and Gaseous Waste Operations Department annual operating report, CY 1992

    Energy Technology Data Exchange (ETDEWEB)

    Gillespie, M.A.; Maddox, J.J.; Scott, C.B.

    1993-03-01

    A total of 6.05 x 10[sup 7] gal of liquid waste was decontaminated by the Process Waste Treatment Plant (PWTP) ion exchange system during CY 1992. This averaged to 115 gpm throughout the year. When necessary, a wastewater sidestream of 50--80 gpm was treated through the use of a natural zeolite treatment system. An additional 8.00 x 10[sup 6] gal (average of 15 gpm throughout the year) were treated by the zeolite system. Therefore, the average total flow treated at the PWTP for CY 1992 was 130 gpm. In mid-June, the zeolite system was repiped to allow it the capability to treat the ion exchange system's discharge due to rising Cs problems in the wastewater. While being used to treat the ion exchange system's discharge, it cannot treat a sidestream of wastewater. During the year, the regeneration of the cation exchange resins resulted in the generation of 7.83 x 10[sup 3] gal of liquid low-level waste (LLLW) concentrate and 1.15 x 10[sup 4] gal of LLLW evaporator feed. The head-end softening process (precipitation/clarification) generated 604 drums (4.40 x 10[sup 3] ft[sup 3]) of solid low-level waste sludge. The zeolite treatment system generated approximately 8.40 x 10[sup 2] ft[sup 3] of spent zeolite resin, which was turned over to the Solid Waste Operations Department for disposal. See Table 1 for a monthly summary of activities at the PWTP. Figures 1, 2, 3, and 4 show a comparison of operations at the PWTP in 1992 with previous years. Figure 5 shows a comparison of annual rainfall at Oak Ridge National Laboratory (ORNL) since 1987. A total of 1.55 x 10[sup 8] gal of liquid waste (average of 294 gpm throughout the year) was treated at the Nonradiological Wastewater Treatment Plant (NRWTP). Of this amount, 1.40 x 10[sup 7] gal were treated by the precipitation/clarification process for removal of heavy metals. Twenty-five boxes (1.60 x 10[sup 3] ft[sup 3]) of solid sludge generated by the precipitation/clarification process were removed from the filter

  4. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1996 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rowan, Gerald D.

    1997-06-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinook and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996.

  5. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  6. IBM PC/IX operating system evaluation plan

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros

    1984-01-01

    An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.

  7. Hinode/EIS science planning and operations tools

    Science.gov (United States)

    Rainnie, Jonn A.

    2016-07-01

    We present the design, implementation and maintenance of the suite of software enabling scientists to design and schedule Hinode/EIS1 operations. The total of this software is the EIS Science Planning Tools (EISPT), and is predominately written in IDL (Interactive Data Language), coupled with SolarSoft (SSW), an IDL library developed for solar missions. Hinode is a multi-instrument and wavelength mission designed to observe the Sun. It is a joint Japan/UK/US consortium (with ESA and Norwegian involvement). Launched in September 2006, its principal scientific goals are to study the Sun's variability and the causes of solar activity. Hinode operations are coordinated at ISAS (Tokyo, Japan). A daily Science Operations meeting is attended by the instrument teams and the spacecraft team. Nominally, science plan uploads cover periods of two or three days. When the forthcoming operations have been agreed, the necessary spacecraft operations parameters are created. These include scheduling for spacecraft pointing and ground stations. The Extreme UV Imaging Spectrometer (EIS) instrument, led by the UK (the PI institute is MSSL), is designed to observe the emission spectral lines of the solar atmosphere. Observations are composed of reusable, hierarchical components, including lines lists (wavelengths of spectral lines), rasters (exposure times, line list, etc.) and studies (defines one or more rasters). Studies are the basic unit of "timeline" scheduling. They are a useful construct for generating more complex sequences of observations, reducing the planning burden. Instrument observations must first be validated. An initial requirement was that operations be shared equally by the 3 main EIS teams (Japan, UK and US). Hence, a major design focus of the software was "Remote Operations", whereby any scientist in any location can run the software, schedule a science plan and send it to the spacecraft commanding team. It would then be validated and combined with the science

  8. Operations planning for agricultural harvesters using ant colony optimization

    Directory of Open Access Journals (Sweden)

    A. Bakhtiari

    2013-07-01

    Full Text Available An approach based on ant colony optimization for the generation for optimal field coverage plans for the harvesting operations using the optimal track sequence principle B-patterns was presented. The case where the harvester unloads to a stationary facility located out of the field area, or in the field boundary, was examined. In this operation type there are capacity constraints to the load that a primary unit, or a harvester in this specific case, can carry and consequently, it is not able to complete the task of harvesting a field area and therefore it has to leave the field area, to unload, and return to continue the task one or more times. Results from comparing the optimal plans with conventional plans generated by operators show reductions in the in-field nonworking distance in the range of 19.3-42.1% while the savings in the total non-working distance were in the range of 18-43.8%. These savings provide a high potential for the implementation of the ant colony optimization approach for the case of harvesting operations that are not supported by transport carts for the out-of-the-field removal of the crops, a practice case that is normally followed in developing countries, due to lack of resources.

  9. Proceedings of the Thirteenth Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    Wardrip, S. C.

    1982-01-01

    Proceedings of an annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting are summarized. A transparent view of the state-of-the-art, an opportunity to express needs, a view of important future trends, and a review of relevant past accomplishments were considered for PTTI managers, systems engineers, and program planner. Specific aims were: to provide PTTI users with new and useful applications, procedures, and techniques; to allow the PTTI researcher to better assess fruitful directions for research efforts.

  10. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny

    2008-01-01

    The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

  11. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1995 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rowan, Gerald D.

    1996-05-01

    The Confederated Tribes of the Umatilla Indian Reservoir (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead, fall chinook and coho salmon. Personnel from the ODFW Eastern Oregon Fish Pathology Laboratory in La Grande took samples of tissues and reproductive fluids from Umatilla River summer steelhead and coho salmon broodstock for monitoring and evaluation purposes. Coded-wire tag recovery information was accessed to determine the contribution of Umatilla river releases to ocean, Columbia River and Umatilla River fisheries.

  12. Westinghouse Hanford Company operational environmental monitoring annual report, CY 1992

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, J.W.; Johnson, A.R.; McKinney, S.M.; Perkins, C.J.

    1993-07-01

    This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1992 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State in 1992. Surveillance activities included sampling and analyses of ambient air, surface water, groundwater, sediments, soil, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and to control the impacts of nuclear facilities and waste sites on the workers and the local environment. Additionally, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although impacts from nuclear facilities are still seen on the Hanford Site and are slightly elevated when compared to offsite, these impacts are less than in previous years.

  13. The optimization of operating parameters on microalgae upscaling process planning.

    Science.gov (United States)

    Ma, Yu-An; Huang, Hsin-Fu; Yu, Chung-Chyi

    2016-03-01

    The upscaling process planning developed in this study primarily involved optimizing operating parameters, i.e., dilution ratios, during process designs. Minimal variable cost was used as an indicator for selecting the optimal combination of dilution ratios. The upper and lower mean confidence intervals obtained from the actual cultured cell density data were used as the final cell density stability indicator after the operating parameters or dilution ratios were selected. The process planning method and results were demonstrated through three case studies of batch culture simulation. They are (1) final objective cell densities were adjusted, (2) high and low light intensities were used for intermediate-scale cultures, and (3) the number of culture days was expressed as integers for the intermediate-scale culture.

  14. GIS Methodology for Planning Planetary-Rover Operations

    Science.gov (United States)

    Powell, Mark; Norris, Jeffrey; Fox, Jason; Rabe, Kenneth; Shu, I-Hsiang

    2007-01-01

    A document describes a methodology for utilizing image data downlinked from cameras aboard a robotic ground vehicle (rover) on a remote planet for analyzing and planning operations of the vehicle and of any associated spacecraft. Traditionally, the cataloging and presentation of large numbers of downlinked planetary-exploration images have been done by use of two organizational methods: temporal organization and correlation between activity plans and images. In contrast, the present methodology involves spatial indexing of image data by use of the computational discipline of geographic information systems (GIS), which has been maturing in terrestrial applications for decades, but, until now, has not been widely used in support of exploration of remote planets. The use of GIS to catalog data products for analysis is intended to increase efficiency and effectiveness in planning rover operations, just as GIS has proven to be a source of powerful computational tools in such terrestrial endeavors as law enforcement, military strategic planning, surveying, political science, and epidemiology. The use of GIS also satisfies the need for a map-based user interface that is intuitive to rover-activity planners, many of whom are deeply familiar with maps and know how to use them effectively in field geology.

  15. Microgrids and distributed generation systems: Control, operation, coordination and planning

    Science.gov (United States)

    Che, Liang

    Distributed Energy Resources (DERs) which include distributed generations (DGs), distributed energy storage systems, and adjustable loads are key components in microgrid operations. A microgrid is a small electric power system integrated with on-site DERs to serve all or some portion of the local load and connected to the utility grid through the point of common coupling (PCC). Microgrids can operate in both grid-connected mode and island mode. The structure and components of hierarchical control for a microgrid at Illinois Institute of Technology (IIT) are discussed and analyzed. Case studies would address the reliable and economic operation of IIT microgrid. The simulation results of IIT microgrid operation demonstrate that the hierarchical control and the coordination strategy of distributed energy resources (DERs) is an effective way of optimizing the economic operation and the reliability of microgrids. The benefits and challenges of DC microgrids are addressed with a DC model for the IIT microgrid. We presented the hierarchical control strategy including the primary, secondary, and tertiary controls for economic operation and the resilience of a DC microgrid. The simulation results verify that the proposed coordinated strategy is an effective way of ensuring the resilient response of DC microgrids to emergencies and optimizing their economic operation at steady state. The concept and prototype of a community microgrid that interconnecting multiple microgrids in a community are proposed. Two works are conducted. For the coordination, novel three-level hierarchical coordination strategy to coordinate the optimal power exchanges among neighboring microgrids is proposed. For the planning, a multi-microgrid interconnection planning framework using probabilistic minimal cut-set (MCS) based iterative methodology is proposed for enhancing the economic, resilience, and reliability signals in multi-microgrid operations. The implementation of high-reliability microgrids

  16. Annual report on the KSRS seismic array operation

    Energy Technology Data Exchange (ETDEWEB)

    Jun, Myung Soon; Kang, Ik Bum; Chi, Heon Cheol; Jeon, Jeong Soo; Shin, In Chul [Korea Institute of Geology Mining and Materials, Taejon (Korea, Republic of)

    1996-12-01

    At 41st GSE meeting on August of 1995, Wonju KSRS was selected as one of 50 primary stations of IMS under CTBT. At 44th GSE meeting on May of 1996, KIGAM was designated as Korea NDC to interface and exchange data with IDC and other countries` NDC, ever since, Wonju KSRS data has been continuously transmitted in near-real time to IDC in Arlington, U.S.A. About 158 countries including Korea has agreed to CTBT and signed up to pass CTBT at the last UN General Assembly on September of 1996. On November 19 and 20, 1996, one meeting, in which each 10 representatives on behalf of Government of Korea and U.S.A. attended, was held to discuss about the transfer of primary responsibility for the operation and maintenance of Wonju KSRS from the Government of U.S.A. to the Government of Korea in Seoul. In this meeting, it was decided that real estates, including areas, buildings, and facilities, related to Wonju KSRS will be returned to Korea but all equipment including 19 SP, 6 LP, 1 BB seismometers will be retained by U.S.A. and KIGAM and AFTAC was designated as Executive agency for Korea and U.S.A., respectively, to jointly operate and maintain Wonju KSRS and work as cooperating agency. Wonju KSRS data are used to estimate the location and magnitude of events in Korean peninsula and around the World. F/K analysis with beam forming and filtering are usually used to determine apparent velocity and azimuth prior to the location of events. LocSAT software based on Geiger`s iterative method, is applied to Wonju KSRS data to locate events. After comparing the results from IDC and data of Wonju KSRS to estimate magnitude of the events, the following equation is obtained ; magnitude(mb) = - 6.29325 + log(A/T) + 2.56676 log({Delta}). (author). 3 refs., 4 maps, 13 tabs., 39 figs.

  17. Lake Billy Shaw Operations and Maintenance, Final Annual Report 2000.

    Energy Technology Data Exchange (ETDEWEB)

    Dodson, Guy; Pero, Vincent (Shoshone-Paiute Tribes of the Duck Valley Reservation. Dept. of Habitat, Parks, Fish and Game.)

    2002-01-01

    Lake Billy Shaw is a newly constructed earthen dam reservoir with a surface area of 430 acres. Construction on the dam and structures was complete in November of 1998. The fish screen structures were complete in December of 1998, with initial filling in May 1999. Upon initial filling, dam structures, monitoring wells, fish screen structures, and lake level were monitored daily, with recordings being taken three times/week. During June 1999 the water to the lake was turned off in order to complete additional construction work on the lake. This work included installation of culverts around the perimeter road, installation of boat launches, finish work on the spillway structure, pumphouse and well protection and planting 4 trees along the entrance to the boat launch area. The water was turned on again in late September 1999 with all structures having been checked, fish screens greased and maintained and well levels being monitored. In 2000 the Operations and Maintenance portion of the project began with monitoring of piezometers, water levels, biological monitoring, riparian plantings, protection of shorelines, and maintenance of structures and appurtances.

  18. Space Station Operations Would Extend Until at Least 2024 Under Obama Plan

    Science.gov (United States)

    Showstack, Randy

    2014-01-01

    An 8 January decision by the White House to propose an extension of the International Space Station's (ISS) operation until at least 2024 would allow for increased research on board the floating laboratory, a longer planning horizon for commercial activities, and a continuation of international cooperation in space, administration officials said. The proposal, which has received initial support from some key members of Congress, would be the second extension for ISS under the Obama administration and would accommodate increased research related to long-duration human space flight, Earth science, and other areas. ISS, which in the United States is authorized under the NASA Authorization Act of 2010, was last extended in 2010 and costs about $3 billion annually to operate.

  19. Hutton Lake NWR, Mortenson Lake NWR, and Bamforth Lake NWR : Annual water management plans, 2004 water use report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Water use reports for 2004 and annual water management plans for 2005 for Mortenson Lake National Wildlife Refuge, Hutton Lake National Wildlife Refuge, and Bamforth...

  20. Lessons Learned for Planning and Estimating Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn

    2011-01-01

    Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

  1. 2017 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Stacy R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-02-01

    The 2017 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base has been prepared in accordance with the “Letter of Agreement Between Department of Energy, National Nuclear Security Administration, Sandia Field Office (DOE/NNSA/SFO) and 377th Air Base Wing (ABW), Kirtland Air Force Base (KAFB) for Terrestrial Sampling” (signed January 2017), Sandia National Laboratories, New Mexico (SNL/NM). The Letter of Agreement requires submittal of an annual terrestrial sampling plan.

  2. Science observation and operation plans of BepiColombo MMO

    Science.gov (United States)

    Murakami, Go; Fujimoto, Masaki

    2016-04-01

    BepiColombo is an ESA-JAXA joint mission to Mercury with the aim to understand the process of planetary formation and evolution as well as to understand similarities and differences between the magnetospheres of Mercury and Earth. The baseline mission consists of two spacecraft, i.e. the Mercury Planetary Orbiter (MPO) and the Mercury Magnetospheric Orbiter (MMO). The two orbiters will be launched in 2017 by an Ariane-5 and arrive at Mercury in 2024. JAXA is responsible for the development and operations of MMO, while ESA is responsible for the development and operations of MPO as well as the launch, transport, and the insertion of two spacecraft into their dedicated orbits. Being a spin-stabilized spacecraft, MMO has much less constraint for plasma observations and is expected to extract essential elements of space plasma physics that become visible in the Hermean environment. However, MMO has large constraints on science operations, such as thermal issue and limited telemetry rate. Due to the thermal issue each science instrument cannot always be turned on. In addition, due to the low telemetry rate in average, only a part (~20-30%) of science mission data with high resolution can be downlinked. Therefore, in order to maximize the scientific results and outcomes to be achieved by MMO, we must optimize the science observation and downlink plans in detail. In this paper, we summarize the basic plans and strategies of MMO science operations.

  3. Hazardous-waste analysis plan for LLNL operations

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, R.S.

    1982-02-12

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan will address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste.

  4. Runway Operations Planning: A Two-Stage Heuristic Algorithm

    Science.gov (United States)

    Anagnostakis, Ioannis; Clarke, John-Paul

    2003-01-01

    The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, can also be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. This paper introduces a two stage heuristic algorithm for solving the Runway Operations Planning (ROP) problem. In the first stage, sequences of departure class slots and runway crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program with a Branch & Bound algorithm implementation. Preliminary results from this implementation of the two-stage algorithm on real-world traffic data are presented.

  5. 76 FR 49841 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Science.gov (United States)

    2011-08-11

    ... process, procedures for joint evaluation and sharing of information regarding the respective transmission... data and information between neighboring transmission planning regions at least annually. 9. Finally... of power flows over an interconnected transmission system. In particular, the...

  6. Decision support for simulation-based operation planning

    Science.gov (United States)

    Schubert, Johan; Hörling, Pontus

    2016-05-01

    In this paper, we develop methods for analyzing large amounts of data from a military ground combat simulation system. Through a series of processes, we focus the big data set on situations that correspond to important questions and show advantageous outcomes. The result is a decision support methodology that provides commanders with results that answer specific questions of interest, such as what the consequences for the Blue side are in various Red scenarios or what a particular Blue force can withstand. This approach is a step toward taking the traditional data farming methodology from its analytical view into a prescriptive operation planning context and a decision making mode.

  7. Annual Conference of China City Planning 2012 & First Meeting of Second Editorial Board of China City Planning Review Held in Kunmin

    Institute of Scientific and Technical Information of China (English)

    QIAN Fang

    2012-01-01

    <正>On Oct. 17, 2012, the Annual Conferenceof China City Planning 2012 that was cohosted by Urban Planning Society of China (UPSC) and Kunming Municipal Government, in collaboration with the Department of Housing and Urban-Rural Development of Yunnan, and sponsored by Kunming Planning Bureau was launched in Yunnan Convention Center, with the theme of "Di-versity and Inclusiveness" WANG Guang-tao, Chairman of Environment Protection and Resources Conservation

  8. 77 FR 30266 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford...

    Science.gov (United States)

    2012-05-22

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2012; William D. Ford Federal... the ICR plan formula for 2012. Under the William D. Ford Federal Direct Loan (Direct Loan)...

  9. 77 FR 20796 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford...

    Science.gov (United States)

    2012-04-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2011; William D. Ford Federal... the ICR plan formula for 2011. Under the William D. Ford Federal Direct Loan (Direct Loan)...

  10. Annual International Conference of the German Operations Research Society (GOR) University of Augsburg

    CERN Document Server

    Borgwardt, Karl-Heinz; Klein, Robert; Tuma, Axel

    2009-01-01

    This book contains 93 selected papers from the symposium "Operations Research 2008" which was held from September 3-5, 2008 at the University of Augsburg, Germany. The international conference, which also serves as the annual meeting of the German Operations Research Society (GOR), attracted 580 participants from more than thirty countries. The general theme "Operations Research and Global Business" stresses the important role of Operations Research in improving decisions in the increasingly complex global business environment. Operations Research represents one of the most successful instruments for organizing business processes, as many applications in areas like supply chain management or financial management show. The book gives a broad overview of the various facets of Operations Research: mathematical methods such as optimization, forecasting, data analysis or game theory and their applications in business, economics and social life.

  11. Proceedings of the 7th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    1975-01-01

    The Proceedings contain the papers presented at the Seventh Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting and the edited record of the discussion period following each paper. This meeting provided a forum to promote more effective, efficient, economical and skillful applications of PTTI technology to the many problem areas to which PTTI offers solutions. Specifically the purpose of the meeting is to: disseminate, coordinate, and exchange practical information associated with precise time and frequency; acquaint systems engineers, technicians and managers with precise time and frequency technology and its applications; and review present and future requirements for PTTI.

  12. The 22nd Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    Sydnor, Richard L. (Editor)

    1990-01-01

    Papers presented at the 22nd Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting are compiled. The following subject areas are covered: Rb, Cs, and H-based frequency standards and cryogenic and trapped-ion technology; satellite laser tracking networks, GLONASS timing, intercomparison of national time scales and international telecommunications; telecommunications, power distribution, platform positioning, and geophysical survey industries; military communications and navigation systems; and dissemination of precise time and frequency by means of GPS, GLONASS, MILSTAR, LORAN, and synchronous communication satellites.

  13. 36 CFR 9.40 - Supplementation or revision of plan of operations.

    Science.gov (United States)

    2010-07-01

    ... of plan of operations. 9.40 Section 9.40 Parks, Forests, and Public Property NATIONAL PARK SERVICE... revision of plan of operations. (a) A proposal to supplement or revise an approved plan of operations may... to address conditions not previously contemplated by notifying the appropriate party in writing...

  14. Studies in swarm intelligence techniques for annual crop planning problem in a new irrigation scheme

    Directory of Open Access Journals (Sweden)

    Adewumi, Aderemi Oluyinka

    2013-11-01

    Full Text Available Annual crop planning (ACP is an NP-Hard type optimisation problem in agricultural planning. It involves finding optimal solutions for the seasonal allocations of a limited amount of agricultural land among the various competing crops that need to be grown on it. This study investigates the effectiveness of employing three relatively new Swarm Intelligence (SI techniques in determining solutions to an ACP problem at a new irrigation scheme. The SI metaheuristics studied include Cuckoo Search (CS, Firefly Algorithm (FA, and Glow-worm Swarm Optimisation (GSO. The solutions determined by these SI techniques are compared against the solutions of Genetic Algorithm (GA, another population-based metaheuristic technique. This helps to determine the relative merits of the solutions found by the SI techniques. The results show that the SI algorithms delivered solutions superior to those of GA in determining solutions to the ACP problem at a new irrigation scheme.

  15. Planning Pharmacies: An Operational Method to Find the Best Location

    Directory of Open Access Journals (Sweden)

    Simona Tondelli

    2014-05-01

    Full Text Available The theme of the spatial distribution of the pharmacies on the territory is closely connected to urban planning and to services supply. In Italy, the regulatory change that took place in 2012, triggered partly by the need to adhere more to a constantly changing economic system, has led to a revision of the existing situation, consisting both on the method to quantify the pharmacies distribution and on the efficiency of the service. If Law 27/2012 has effectively allowed municipalities to increase the number of pharmacies that they can settle on the municipal territory, it has also started a process of rethinking the logic of pharmacies location and of their catchment areas. In this framework, the present paper aims to discuss the merits of a regulatory evolutions that sparked the process of liberalization of locations, integrating the law guidelines and goals with an operating logic process, usable and useful to translate goals into planning actions in a continuous dialogue between law and territory, constraints and opportunities, equity and accessibility of the care services. Following this logic operations, we have investigated the urban context of Castelfranco Emilia, assuming the location of new offices on the basis of pharmaceutical analyzes.

  16. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  17. Hungry Horse Mitigation Plan; Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam, 1990-2003 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.; Marotz, Brian L. (Montana Department of Fish, Wildlife and Parks, Helena, MT); DosSantos, Joseph M. (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

    2003-04-01

    In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is one of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and

  18. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    Energy Technology Data Exchange (ETDEWEB)

    D. Shanklin

    2006-07-19

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.

  19. The Operation “Big Saturn”: Plan and Implementation Opportunities

    Directory of Open Access Journals (Sweden)

    Ochirov Utash Borisovich

    2015-11-01

    Full Text Available The article analyzes the plan of one of the most important operations of a radical turning point in the course of the Great Patriotic War. Initially, the plan, conceived as the development of Operation “Uranus” and resulted in the encirclement of the 6th Army headed by Field Marshall Paulus at Stalingrad, was called “Saturn”. However, after creating a shortened version of the name “Small Saturn”, it was called “Big Saturn”. The main purpose of “Saturn” was to conduct the strategic offensive with the help of four or five armies from middle Don and Chir towards Rostov-on-Don to withdraw the enemy Army Group “Don” and Army Group “A” from the Caucasus. The enemy army groups consisted of almost a third of the units of the Wehrmacht and its allies, who fought against the Soviet Union and their defeat or delay on the Taman Peninsula where there was no port capacity for rapid evacuation of such a large group of people, equipment and supplies, could significantly change the balance of forces on the Eastern front. Unfortunately, the Сhief of the General Staff of the Red Army Alexander Vasilevsky, who was initially in charge of the “Saturn” operation as the representative of Stavka (General Headquarters, was appointed by Stalin in late November as a coordinator of the Soviet troops, achieving the encirclement of the surrounded Paulus’s grouping. Vasilevsky, using his authority, managed to transfer a significant part of the strategic reserves from the middle Don direction firstly to the Stalingrad direction and then to the Kotelnikovsky direction against unlocking grouping of Manstein. The analysis of the forces of the Stalingrad Front, given in the article, shows that there were enough troops to repulse an attack. The transferred strategic reserves proved to be redundant, and their offensive on Rostov failed, while their usage according to the plan “Saturn” would have led to undeniable success. As a result, Manstein

  20. ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 2009

    Energy Technology Data Exchange (ETDEWEB)

    FORSYTHE, HOWARD S

    2010-04-14

    This Annual Report presents the data and evaluates the progress of the three-component remedy implemented for remediation of groundwater contamination at Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory Site. Overall, each component is achieving progress toward the goal of total plume remediation. In situ bioremediation operations in the hot spot continue to operate as planned. Progress toward the remedy objectives is being made, as evidenced by continued reduction in the amount of accessible residual source and decreases in downgradient contaminant flux, with the exception of TAN-28. The injection strategy is maintaining effective anaerobic reductive dechlorination conditions, as evidenced by complete degradation of trichloroethene and ethene production in the biologically active wells. In the medial zone, the New Pump and Treat Facility operated in standby mode. Trichloroethene concentrations in the medial zone wells are significantly lower than the historically defined concentration range of 1,000 to 20,000 μg/L. The trichloroethene concentrations in TAN-33, TAN-36, and TAN-44 continue to be below 200 μg/L. Monitoring in the distal zone wells outside and downgradient of the plume boundary demonstrate that some plume expansion has occurred, but less than the amount allowed in the Record of Decision Amendment. Additional data need to be collected for wells in the monitored natural attenuation part of the plume to confirm that the monitored natural attenuation part of the remedy is proceeding as predicted in the modeling.

  1. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1989.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1988-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501. the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1989. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3 of the Program. The Work Plan includes schedules with key milestones for FY 1989 and beyond, and is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded projects discussed in the FY 1989 Work Plan are listed in Tables 1 and 2 according to their current status. Table 1 (pp. 3-11) lists completed, ongoing, and deferred projects. Table 2 (pp. 12-13) lists all projects which BPA plans to fund as ''new'' projects in FY 1989. ''Ongoing'' status indicates that the project started in FY 1988 or before, and that it was still being implemented by BPA at the end of FY 1988. &apos

  2. Kalispel Resident Fish Project: Kalispel Tribal Hatchery Operations and Maintenance, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bluff, Stanley

    2000-12-01

    No Annual Production Goals were achieved for the year. The Kalispel Hatchery experienced two episodes of brood fish mortality. The first due to a standpipe malfunction and the second attributed to gas bubble disease caused by elevated Total Dissolved Gases (TDG's) in the reservoir. To date, the hatchery has 29 brood fish in the raceway and ready to spawn. If all things go well this spring, hatchery operations should be well underway next year.

  3. Liquid and Gaseous Waste Operations Department Annual Operating Report, CY 1993

    Energy Technology Data Exchange (ETDEWEB)

    Maddox, J.J.; Scott, C.B.

    1994-02-01

    This report summarizes the activities of the waste management operations section of the liquid and gaseous waste operations department at ORNL for 1993. The process waste, liquid low-level waste, gaseous waste systems activities are reported, as well as the low-level waste solidification project. Upgrade activities is the various waste processing and treatment systems are summarized. A maintenance activity overview is provided, and program management, training, and other miscellaneous activities are covered.

  4. Planning Matters: Response Operations following the 30 September 2009 Sumatran Earthquake

    Science.gov (United States)

    Comfort, L. K.; Cedillos, V.; Rahayu, H.

    2009-12-01

    Response operations following the 9/30/2009 West Sumatra earthquake tested extensive planning that had been done in Indonesia since the 26 December 2004 Sumatran Earthquake and Tsunami. After massive destruction in Aceh Province in 2004, the Indonesian National Government revised its national disaster management plans. A key component was to select six cities in Indonesia exposed to significant risk and make a focused investment of resources, planning activities, and public education to reduce risk of major disasters. Padang City was selected for this national “showcase” for disaster preparedness, planning, and response. The question is whether planning improved governmental performance and coordination in practice. There is substantial evidence that disaster preparedness planning and training initiated over the past four years had a positive effect on Padang in terms of disaster risk reduction. The National Disaster Management Agency (BNPB, 10/28/09) reported the following casualties: Padang City: deaths, 383; severe injuries, 431, minor injuries, 771. Province of West Sumatra: deaths, 1209; severe injuries, 67; minor injuries, 1179. These figures contrasted markedly with the estimated losses following the 2004 Earthquake and Tsunami when no training had been done: Banda Aceh, deaths, 118,000; Aceh Province, dead/missing, 236,169 (ID Health Ministry 2/22/05). The 2004 events were more severe, yet the comparable scale of loss was significantly lower in the 9/30/09 earthquake. Three factors contributed to reducing disaster risk in Padang and West Sumatra. First, annual training exercises for tsunami warning and evacuation had been organized by national agencies since 2004. In 2008, all exercises and training activities were placed under the newly established BNPB. The exercise held in Padang in February, 2009 served as an organizing framework for response operations in the 9/30/09 earthquake. Public officers with key responsibilities for emergency operations

  5. 77 FR 24440 - Approval and Promulgation of Air Quality Implementation Plans; North Carolina; Annual Emissions...

    Science.gov (United States)

    2012-04-24

    ... Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4..., Chief, Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management...-8960. Such deliveries are only accepted during the Regional Office's normal hours of operation....

  6. Office for Analysis and Evaluation of Operational Data. Annual report, 1994-FY 95

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-07-01

    The United States Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) has published reports of its activities since 1984. The first report covered January through June of 1984, and the second report covered July through December 1984. Since those first two semiannual reports, AEOD has published annual reports of its activities from 1985 through 1993. Beginning with the report for 1986, AEOD Annual Reports have been published as NUREG-1272. Beginning with the report for 1987, NUREG-1272 has been published in two parts, No. 1 covering power reactors and No. 2 covering nonreactors (changed to {open_quotes}nuclear materials{close_quotes} with the 1993 report). The 1993 AEOD Annual Report was NUREG-1272, Volume 8. AEOD has changed its annual report from a calendar year to a fiscal year report to be consistent with the NRC Annual Report and to conserve staff resources. NUREG-1272, Volume 9, No. 1 and No. 2, therefore, are combined calendar year 1994 (1994) and fiscal year 1995 (FY 95) reports which describe activities conducted between January 1, 1994, and September 30, 1995. Certain data which have historically been reported on a calendar year basis, however, are complete through calendar year 1995. Throughout this report, whenever information is presented for fiscal year 1995, it is designated as FY 95 data. Calendar year information is always designated by the four digits of the calendar year. This report, NUREG-1272, Volume 9, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective. NUREG-1272, Vol. 9, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in non-power reactor applications. A new part has been added, NUREG-1272, Volume 9, No. 3, which covers technical training and presents the activities of the Technical Training Center in FY 95 in support of the NRC`s mission.

  7. Implementation plan for WRAP Module 1 operational readiness review

    Energy Technology Data Exchange (ETDEWEB)

    Irons, L.G.

    1994-11-04

    The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR.

  8. Implementing Strategic Planning Capabilities Within the Mars Relay Operations Service

    Science.gov (United States)

    Hy, Franklin; Gladden, Roy; Allard, Dan; Wallick, Michael

    2011-01-01

    Since the Mars Exploration Rovers (MER), Spirit and Opportunity, began their travels across the Martian surface in January of 2004, orbiting spacecraft such as the Mars 2001 Odyssey orbiter have relayed the majority of their collected scientific and operational data to and from Earth. From the beginning of those missions, it was evident that using orbiters to relay data to and from the surface of Mars was a vastly more efficient communications strategy in terms of power consumption and bandwidth compared to direct-to-Earth means. However, the coordination between the various spacecraft, which are largely managed independently and on differing commanding timelines, has always proven to be a challenge. Until recently, the ground operators of all these spacecraft have coordinated the movement of data through this network using a collection of ad hoc human interfaces and various, independent software tools. The Mars Relay Operations Service (MaROS) has been developed to manage the evolving needs of the Mars relay network, and specifically to standardize and integrate the relay planning and coordination data into a centralized infrastructure. This paper explores the journey of developing the MaROS system, from inception to delivery and acceptance by the Mars mission users.

  9. Screening family planning needs: an operations research project in Guatemala

    Directory of Open Access Journals (Sweden)

    Burkhart Marianne

    2004-05-01

    Full Text Available Abstract Background Public sector health care providers in rural Guatemala have infrequently offered family planning information and services in routine visits. This operations research project tested a strategy to modify certain practices that prevent health workers from proactively screening clients' needs and meeting them. Methods The research design was quasi-experimental with a pretest-posttest-follow-up comparison group design. Health districts, which comprise health centers and posts, were purposively assigned to intervention or comparison groups to assure comparability of the two groups. The strategy was based on a job-aid designed to guide health workers in screening clients' reproductive intentions and family planning needs, help them to offer contraceptive methods if the woman expressed interest, and facilitate the provision of the method chosen at the time of the visit. The strategy was implemented at intervention sites during a period of six months. Upon completion of post-intervention measurements, the strategy was scaled up to the comparison sites, and a follow-up assessment was conducted nine months later. Results were evaluated by conducting three rounds of exit interviews with women exposed to the risk of unwanted pregnancy. Results Study results showed a two to five-fold increase in providers' screening of clients' reproductive intentions. The proportion of clients who received information about contraceptives increased from 8% at the baseline to 42% immediately post-intervention, and 36% at the follow-up survey. The intervention also proved successful in improving the role service providers play in offering women a chance to ask questions and assisting women in making a selection. The proportion of women who received a method, referral or appointment increased and remained high in the intervention group, although no change was seen in the comparison group after their participation in the strategy. Conclusion The easy

  10. Planning the annual cycle in groups of cadet combat sports perfection

    Directory of Open Access Journals (Sweden)

    Ananchenko Konstantin

    2016-08-01

    Full Text Available Within a large training cycle in conditions of high general level of stress the authors recommend optimal implementation of planning undulating dynamics of cadets’ combat exercise stress. The article proves the efficiency of one-cycle construction of training highly- qualified single-combat cadets at the stage of maximal realization of sporting possibilities, which includes both features of traditional cycles (preparatory, competitional, transitional and module-sectional composition of training. It scientifically substantiates, that the choice of those or other types of microcycles which present the structure of mesocycles is determined by a few basic factors which must be necessarily taken into account while planning the training process of sportsmen of different qualification. It is suggested to use certain varieties of microcycles in the practice of preparation of single combat cadets. It is substantiated that accounting in planning the annual cycle in groups of sporting perfection of students of the educed types of microcycles for every type of single combats is an actual task of further scientific research.

  11. Annual Review of Aircraft Accident Data. US Carrier Operations Calendar Year 1997

    Science.gov (United States)

    2002-01-24

    U.S. AIR CARRIER OPERATIONS 1987 - 1997 Number of Accidents by Segements of Aviation Involved Accidents S135 N135 N135 S121 Total and and and and Year...planning/decision 1 1 Lack of familiarity with geographic area 1 0 Proper alignment 1 1 Raising of flaps 1 0 Refueling 1 0 Self-induced pressure 1 0

  12. Integrated Hatchery Operations Team: Policies and Procedures for Columbia Basin Anadromous Salmonid Hatcheries, 1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Integrated Hatchery Operations Team (Northwest Power Planning Council, Portland, OR)

    1995-01-01

    This document outlines regional policies and procedures for hatchery operations in the Columbia River Basin. The purpose of these policies is to provide regional guidelines by which all anadromous fish hatcheries will be operated. These policies will be adopted by the fisheries co-managers, and will provide guidance to operate hatcheries in an efficient and biologically sound manner. The hatchery policies presented in this manual are not intended to establish production priorities. Rather, the intent is to guide hatchery operations once production numbers are established. Hatchery operations discussed in this report include broodstock collection, spawning, incubation of eggs, fish rearing and feeding, fish release, equipment maintenance and operations, and personnel training. Decisions regarding production priorities must be provided by fishery managers through a comprehensive plan that addresses both natural and hatchery fish production. The Integrated Hatchery Operations Team is a multi-agency group called for by the Northwest Power Planning Council. This team was directed to develop new basinwide policies for managing and operating all existing and future anadromous fish hatcheries in the Columbia River Basin. The parties pledge to confer with each other and to use their authorities and resources to accomplish these mutually acceptable hatchery practices.

  13. 30 CFR 250.111 - Who oversees operations under my welding plan?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Who oversees operations under my welding plan... § 250.111 Who oversees operations under my welding plan? A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that each welder...

  14. Savannah River Reactor Operation: Indices of risk for emergency planning

    Energy Technology Data Exchange (ETDEWEB)

    O' Kula, K.R.; East, J.M.

    1990-10-01

    Periodically it is necessary to re-examine the implications of new source terms for neighboring offsite populations as Probabilistic Risk Assessment (PRA) and Severe Accident studies mature, and lead to a better understanding of the progression of hypothetical core melt accidents in the Savannah River Site (SRS) reactors. In this application multiple-system failure, low-frequency events, and consequently higher radiological source terms than from normal operation or design basis accidents (DBAs) are considered. Measures of consequence such as constant dose vs distance, boundary doses, and health effects to close-in populations are usually examined in this context. A set of source terms developed for the Safety Information Document (SID) for support of the Reactor Operation Environmental Impact Statement (EIS) forms the basis for the revised risk evaluation discussed herein. The intent of this review is not to completely substantiate the sufficiency of the current Emergency Planning Zone (EPZ). However, the two principal measures (200-rem red-bone marrow dose vs distance and 300-rem thyroid dose vs distance) for setting an EPZ are considered. Additional dose-at-distance calculations and consideration of DBA doses would be needed to complete a re-evaluation of the current EPZ. These subject areas are not addressed in the current document. Also, this report evaluates the sensitivity of individual risk estimates to the extent of offsite evacuation assumed from a K reactor severe accident and compares these risks to the Draft DOE Safety Guidelines. 14 refs., 8 figs., 4 tabs.

  15. 42 CFR 457.750 - Annual report.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Annual report. 457.750 Section 457.750 Public..., Reporting, and Evaluation § 457.750 Annual report. (a) Report required for each Federal fiscal year. A State... State's assessment of the operation of the State plan. (b) Contents of annual report. In the...

  16. Operation REDWING Commander Task Group 7.3, Operation Plan Number 1-56.

    Science.gov (United States)

    1956-01-24

    9 Decoder 1955 indicates for each unit a two digit numbal which is to be appended to the designation SNF in order to identify the ship _ or unit for...Center) XWAJALEIN D-3_ Annex D to OTG 7.3 No -1-56 SEARCH AND RESCUE PLAN b. Comunications . An specified in reference (b) and Annex E of this-Operation...satisfactory comunications should be employed to transmit CONFIDENTIAL traffic when necessary to transmit visually in the clear. a, Vessels having three or

  17. Proceedings of the 23rd Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    Sydnor, Richard L. (Editor)

    1992-01-01

    A compilation of technical papers, from the 23rd annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting, is presented. Papers were given in the following categories: (1) developments in rubidium, cesium, and hydrogen-based frequency standards, and in cryogenic and trapped-ion technology; (2) international and transnational applications of PTTI technology with emphasis on satellite laser tracking networks, GLONASS timing, comparison of national time scales and international communications; (3) applications of PTTI technology to the telecommunications, power distribution, platform positioning, and geophysical survey industries; (4) applications of PTTI technology to evolving military communications and navigation systems; and (5) dissemination of precise time and frequency by means of GPS, GLONASS, MILSTAR, Loran, and synchronous communications satellites.

  18. The 26th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    Sydnor, Richard (Editor)

    1995-01-01

    This document is a compilation of technical papers presented at the 26th Annual PTTI Applications and Planning Meeting. Papers are in the following categories: (1) Recent developments in rubidium, cesium, and hydrogen-based frequency standards, and in cryogenic and trapped-ion technology; (2) International and transnational applications of Precise Time and Time Interval technology with emphasis on satellite laser tracking, GLONASS timing, intercomparison of national time scales and international telecommunications; (3) Applications of Precise Time and Time Interval technology to the telecommunications, power distribution, platform positioning, and geophysical survey industries; (4) Applications of PTTI technology to evolving military communications and navigation systems; and (5) Dissemination of precise time and frequency by means of GPS, GLONASS, MILSTAR, LORAN, and synchronous communications satellites.

  19. 27th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    Sydnor, Richard L. (Editor)

    1996-01-01

    This document is a compilation of technical papers presented at the 27th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting, held November 29 - December 1, 1995 at San Diego, CA. Papers are in the following categories: Recent developments in rubidium, cesium, and hydrogen-based frequency standards; and in cryogenic and trapped-ion technology; International and transnational applications of PTTI technology with emphasis on satellite laser tracking, GLONASS timing, intercomparison of national time scales and international telecommunications; Applications of PTTI technology to the telecommunications, power distribution, platform positioning, and geophysical survey industries; Applications of PTTI technology to evolving military communications and navigation systems; and Dissemination of precise time and frequency by means of Global Positioning System (GPS), Global Satellite Navigation System (GLONASS), MILSTAR, LORAN, and synchronous communications satellites.

  20. Office of Analysis and Evaluation of Operational Data 1989 annual report, Power reactors

    Energy Technology Data Exchange (ETDEWEB)

    None

    1990-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1989. The report is published in two separate parts. This document, NUREG-1272, Vol. 4, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. This report also compiles the status of staff actions resulting from previous Incident Investigation Team (IIT) reports. 16 figs., 9 tabs.

  1. Burns Interagency Fire Zone : Fire Danger Operating and Preparedness Plan 2010

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the Fire Danger Operating and Preparedness Plan for the Burns Interagency Fire Zone. This plan provides a method to calculate the preparedness and dispatch...

  2. 40 CFR 141.804 - Aircraft water system operations and maintenance plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Aircraft water system operations and... § 141.804 Aircraft water system operations and maintenance plan. (a) Each air carrier must develop and implement an aircraft water system operations and maintenance plan for each aircraft water system that...

  3. Replanning Using Hierarchical Task Network and Operator-Based Planning

    Science.gov (United States)

    Wang, X.; Chien, S.

    1997-01-01

    In order to scale-up to real-world problems, planning systems must be able to replan in order to deal with changes in problem context. In this paper we describe hierarchical task network and operatorbased re-planning techniques which allow adaptation of a previous plan to account for problems associated with executing plans in real-world domains with uncertainty, concurrency, changing objectives.

  4. 78 FR 33395 - Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013-William D. Ford...

    Science.gov (United States)

    2013-06-04

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Annual Updates to the Income Contingent Repayment (ICR) Plan Formula for 2013--William D. Ford Federal...- 800-877-8339. SUPPLEMENTARY INFORMATION: Under the William D. Ford Federal Direct Loan (Direct...

  5. Gas Hydrate Research Site Selection and Operational Research Plans

    Science.gov (United States)

    Collett, T. S.; Boswell, R. M.

    2009-12-01

    In recent years it has become generally accepted that gas hydrates represent a potential important future energy resource, a significant drilling and production hazard, a potential contributor to global climate change, and a controlling factor in seafloor stability and landslides. Research drilling and coring programs carried out by the Ocean Drilling Program (ODP), the Integrated Ocean Drilling Program (IODP), government agencies, and several consortia have contributed greatly to our understanding of the geologic controls on the occurrence of gas hydrates in marine and permafrost environments. For the most part, each of these field projects were built on the lessons learned from the projects that have gone before them. One of the most important factors contributing to the success of some of the more notable gas hydrate field projects has been the close alignment of project goals with the processes used to select the drill sites and to develop the project’s operational research plans. For example, IODP Expedition 311 used a transect approach to successfully constrain the overall occurrence of gas hydrate within the range of geologic environments within a marine accretionary complex. Earlier gas hydrate research drilling, including IODP Leg 164, were designed primarily to assess the occurrence and nature of marine gas hydrate systems, and relied largely on the presence of anomalous seismic features, including bottom-simulating reflectors and “blanking zones”. While these projects were extremely successful, expeditions today are being increasingly mounted with the primary goal of prospecting for potential gas hydrate production targets, and site selection processes designed to specifically seek out anomalously high-concentrations of gas hydrate are needed. This approach was best demonstrated in a recently completed energy resource focused project, the Gulf of Mexico Gas Hydrate Joint Industry Project Leg II (GOM JIP Leg II), which featured the collection of a

  6. SSI`s International Development Co-operation (SIUS). Annual report 1998

    Energy Technology Data Exchange (ETDEWEB)

    Szendroe, G.; Grapengiesser, S.; Johansson, Gunnar

    1999-04-01

    SSI`s International Development Co-operation (SIUS), the Swedish program for radiation protection work in Central and Eastern Europe, has since its start in 1992 been granted SEK 109 million by the Swedish government. The projects are accessed, planned and performed in close co-operation with partner organisations in Eastern Europe. This report presents the financial status and a summary of the projects, their status and distribution over the countries and project areas. The presentation is updated as of December 1998

  7. Annual Summary Report Calendar Year 2000 for the 100-HR-3, 100-KR-4, and 100-NR-2 Operable Units and Pump-and-Treat Operations

    Energy Technology Data Exchange (ETDEWEB)

    G. B. Mitchem

    2001-08-22

    This annual progress and performance evaluation report discusses the groundwater remedial actions in the 100 Area, including the interim actions at the 100-HR-3 and 100-KR-4 Operable Units, and also discusses the expedited response action in the 100-NR-2 operable unit.

  8. Mitigation for the Construction and Operation of Libby Dam, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2002-09-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.

  9. Development and Evaluation of an Intuitive Operations Planning Process

    Science.gov (United States)

    2006-03-01

    flip chart with paper, talc (for creating overlays), pens and pencils, etc. The planning teams used the laptops, whiteboards, flipcharts and talc for...working together to determine structure and composition (ORBAT) of the armored BG 0:06 Putting info on flip chart 1 0:07 Cmdr leaves to go planning 0

  10. Heuristics in Global Combat Logistics Force Operational Planning

    Science.gov (United States)

    2010-03-01

    maximizes deployed battle group on-station-time and endurance. The author presents a heuristic algorithm extension to the legacy CLF planning tool to plan...for completion, and can require 5 minutes to an hour just to find an initial feasible solution. On the contrary, a heuristic algorithm can provide initial feasible solutions in a matter of seconds.

  11. 25 CFR 171.500 - How does BIA determine the annual operation and maintenance assessment rate for the irrigation...

    Science.gov (United States)

    2010-04-01

    ... maintenance assessment rate for the irrigation facility servicing my farm unit? 171.500 Section 171.500 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND... annual operation and maintenance assessment rate for the irrigation facility servicing my farm unit?...

  12. MSFC Doppler Lidar Science experiments and operations plans for 1981 airborne test flight

    Science.gov (United States)

    Fichtl, G. H.; Bilbro, J. W.; Kaufman, J. W.

    1981-01-01

    The flight experiment and operations plans for the Doppler Lidar System (DLS) are provided. Application of DLS to the study of severe storms and local weather penomena is addressed. Test plans involve 66 hours of flight time. Plans also include ground based severe storm and local weather data acquisition.

  13. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    Science.gov (United States)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  14. 77 FR 37283 - General Provisions; Operating and Strategic Business Planning; Effective Date

    Science.gov (United States)

    2012-06-21

    ... From the Federal Register Online via the Government Publishing Office FARM CREDIT ADMINISTRATION 12 CFR Part 618 RIN 3052-AC66 General Provisions; Operating and Strategic Business Planning... Credit System institution to adopt an operational and strategic business plan to include, among...

  15. Environmental Protection Department Operations and Regulatory Affairs Division LLNL NESHAPs 2005 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Larson, J; Peterson, S R; Wilson, K; Bowen, B; MacQueen, D; Wegrecki, A

    2006-06-19

    This annual report is prepared pursuant to the National Emission Standards for Hazardous Air Pollutants (NESHAPs; Title 40 Code of Federal Regulations [CFR] Part 61, Subpart H). Subpart H governs radionuclide emissions to air from Department of Energy (DOE) facilities. NESHAPs limits the emission of radionuclides to the ambient air from DOE facilities to levels resulting in an annual effective dose equivalent (EDE) of 10 mrem (100 {micro}Sv) to any member of the public. The EDEs for the Lawrence Livermore National Laboratory (LLNL) site-wide maximally exposed members of the public from operations in 2005 are summarized here. Livermore site: 0.0065 mrem (0.065 {micro}Sv) (41% from point source emissions, 59% from diffuse source emissions). The point source emissions include gaseous tritium modeled as tritiated water vapor as directed by EPA Region IX; the resulting dose is used for compliance purposes. Site 300: 0.018 mrem (0.18 {micro}Sv) (48% from point source emissions, 52% from diffuse source emissions). The EDEs were calculated using the EPA-approved CAP88-PC air dispersion/dose-assessment model, except for doses for two diffuse sources that were estimated using measured radionuclide concentrations and dose coefficients. Specific inputs to CAP88-PC for the modeled sources included site-specific meteorological data and source emissions data, the latter variously based on continuous stack effluent monitoring data, stack flow or other release-rate information, ambient air monitoring data, and facility knowledge.

  16. Environmental Release Prevention and Control Plan (ERP and CP) annual review and update for 1993

    Energy Technology Data Exchange (ETDEWEB)

    Jannik, G.T. [comp.; Mamatey, A.; Arnett, M.

    1993-10-05

    In the Environmental Release Prevention and Control Plan (ERP and CP), WSRC made a commitment to conduct the following follow-up activities and actions: (1) Complete the action items developed in response to the findings and recommendation of the Environmental Release Prevention Taskteam (WSRC-RP-92-356). (2) Complete all batch and continuous release procedure revisions to incorporate the attributes that WSRC senior management required of each procedure. (3) DOE-SR Assistance Managers and WSRC counterparts to reach consensus and closure on the identified engineered solutions documented in the ERP and CP, develop and drive implementation of facility changes per the agreements. (4) Continue to analyze releases and monitor performance in accordance with the ERP and CP, and utilize the ALARA Release Guides Committee to drive improvements. (5) Conduct annual re-evaluations of the cost benefit analyses of the identified engineered solutions, and identify new options and alternatives for each outfall in response to site mission and facility changes. This report documents the efforts that have been completed over the past year in response to these commitments.

  17. Use of sales and operations planning in small and medium-sized enterprises

    Directory of Open Access Journals (Sweden)

    Michał Adamczak

    2013-03-01

    Full Text Available Background: Increasing competitiveness in the market, customer expectations related to the shortening of the deadlines and the reduction of prices of products and services force companies to improve the efficiency of internal processes. The integration of planning process is one of possible ways to achieve this aim. The integration of planning processes by the use of SOP model (Sales and Operations Planning is a method to implement this idea. The study allowed to identify ways to implement the process of sales and operations planning in small and medium-sized enterprises. Material and methods: The study was conducted in companies from different industries. The research method was in-depth interviews conducted with managers of companies or persons occupying management positions in the organizational process of implementing sales and operations planning. Results: During the survey, 10 companies were asked about the use of sales and operations planning, its elements and organizational aspects of its development, by the company. Conclusions: The use of sales and operations plan is closely dependent on the size of the company and its localization in the supply chain. Small enterprises are not interested in the integration of the planning process due to the small scale of operations and the centralization of decision-making process. Medium-sized enterprises, due to the increased complexity of the processes of planning, see the benefits of their integration in the SOP model.

  18. Office for Analysis and Evaluation of Operational Data 1990 annual report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1990. The report is published in two separate parts. This document NUREG-1272, Vol. 5, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol.5, No. 2, covers nonreactors and presents a review of the events and concerns during 1990 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. Each volume contains a list of the AEOD reports issued for 1980 through 1990. 9 figs., 8 tabs.

  19. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.

  20. Office for Analysis and Evaluation of Operational Data. 1992 annual report: Nonreactors: Volume 7, No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued for 1981--1992.

  1. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.

  2. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.

  3. Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation, 2007-2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Merz, Norm [Kootenai Tribe of Idaho

    2009-02-18

    The overarching goals of the 'Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation' Project (BPA Project No.2002-011-00) are to: (1) assess abiotic and biotic factors (i.e., geomorphologic, hydrological, aquatic and riparian/floodplain communities) in determining a definitive composition of ecological integrity, (2) develop strategies to assess and mitigate losses of ecosystem functions, and (3) produce a regional operational loss assessment framework. To produce a scientifically defensible, repeatable, and complete assessment tool, KTOI assembled a team of top scientists in the fields of hydrology, hydraulics, ornithology, entomology, statistics, and river ecology, among other expertise. This advisory team is known as the Research Design and Review Team (RDRT). The RDRT scientists drive the review, selection, and adaptive management of the research designs to evaluate the ecologic functions lost due to the operation of federal hydropower facilities. The unique nature of this project (scientific team, newest/best science, adaptive management, assessment of ecological functions, etc.) has been to work in a dynamic RDRT process. In addition to being multidisciplinary, this model KTOI project provides a stark contrast to the sometimes inflexible process (review, re-review, budgets, etc.) of the Columbia River Basin Fish and Wildlife Program. The project RDRT is assembled annually, with subgroups meeting as needed throughout the year to address project issues, analyses, review, and interpretation. Activities of RDRT coordinated and directed the selection of research and assessment methodologies appropriate for the Kootenai River Watershed and potential for regional application in the Columbia River Basin. The entire RDRT continues to meet annually to update and discuss project progress. RDRT Subcontractors work in smaller groups throughout the year to meet project objectives. Determining the extent to

  4. Emergency preparedness exercises and information. Annual report 1996. Project plans 1997; Beredskapsoevelser og informasjonsutveksling. Aarsrapport 1996. Plan 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    EKO-4, Emergency preparedness exercises and information exchange, consists of two sub projects. In EKO-4.1, Exercises and scenario development, a functional exercise on dose calculation has been arranged and followed up by a seminar. In addition, a seminar for intercomparison of Nordic dispersion models has been arranged bases on results from the international full scale experiment ETEX-1. Both arrangements showed to be useful for the nuclear emergency preparedness in the Nordic countries and contributed to better knowledge about the different models. Such arrangements also strengthen the personal networks. In EKO-4.1, a survey on available tools for scenario development for national and regional exercises in the Nordic country is going on. The needs from the exercise planners point of view will be focused before further development is suggested. In EKO-4.2, Nordic system for exchange of data and information, the working group has evaluated different technical solutions. The results have been presented in a report. The work with implementing the system has been delayed but it will continue next year in close co-operation with the Nordic authorities working group on emergency preparedness (NEP). A new version of the nuclear emergency preparedness handbook has been published. There is a need for further revisions and these are planned for 1997. With the new revision, the handbook will be made available on WWW. (EG).

  5. COMPARISON OF TWO METHODS OF OPERATING THEATRE PLANNING: APPLICATION IN BELGIAN HOSPITAL

    Institute of Scientific and Technical Information of China (English)

    Sondes CHAABANE; Nadine MESKENS; Alain GUINET; Marius LAURENT

    2008-01-01

    Operating Theatre is the centre of the hospital management's efforts. It constitutes the most expensive sector with more than 10% of the intended operating budget of the hospital. To reduce the costs while maintaining a good quality of care, one of the solutions is to improve the existent planning and scheduling methods by improving the services and surgical specialty coordination or finding the best estimation of surgical case durations. The other solution is to construct an effective surgical case plan and schedule. The operating theatre planning and scheduling is the two important steps, which aim to make a surgical case programming with an objective of obtaining a realizable and efficient surgical case schedule. This paper focuses on the first step, the operating theatre planning problem. Two planning methods are introduced and compared. Real data of a Belgian university hospital "Tivoli" are used for the experiments.

  6. Benefits to blood banks of a sales and operations planning process.

    Science.gov (United States)

    Keal, Donald A; Hebert, Phil

    2010-12-01

    A formal sales and operations planning (S&OP) process is a decision making and communication process that balances supply and demand while integrating all business operational components with customer-focused business plans that links high level strategic plans to day-to-day operations. Furthermore, S&OP can assist in managing change across the organization as it provides the opportunity to be proactive in the face of problems and opportunities while establishing a plan for everyone to follow. Some of the key outcomes from a robust S&OP process in blood banking would include: higher customer satisfaction (donors and health care providers), balanced inventory across product lines and customers, more stable production rates and higher productivity, more cooperation across the entire operation, and timely updates to the business plan resulting in better forecasting and fewer surprises that negatively impact the bottom line.

  7. An Operational Framework for Insecticide Resistance Management Planning.

    Science.gov (United States)

    Chanda, Emmanuel; Thomsen, Edward K; Musapa, Mulenga; Kamuliwo, Mulakwa; Brogdon, William G; Norris, Douglas E; Masaninga, Freddie; Wirtz, Robert; Sikaala, Chadwick H; Muleba, Mbanga; Craig, Allen; Govere, John M; Ranson, Hilary; Hemingway, Janet; Seyoum, Aklilu; Macdonald, Michael B; Coleman, Michael

    2016-05-01

    Arthropod vectors transmit organisms that cause many emerging and reemerging diseases, and their control is reliant mainly on the use of chemical insecticides. Only a few classes of insecticides are available for public health use, and the increased spread of insecticide resistance is a major threat to sustainable disease control. The primary strategy for mitigating the detrimental effects of insecticide resistance is the development of an insecticide resistance management plan. However, few examples exist to show how to implement such plans programmatically. We describe the formulation and implementation of a resistance management plan for mosquito vectors of human disease in Zambia. We also discuss challenges, steps taken to address the challenges, and directions for the future.

  8. Procurement planning in oil refining industries considering blending operations

    DEFF Research Database (Denmark)

    Oddsdottir, Thordis Anna; Grunow, Martin; Akkerman, Renzo

    2013-01-01

    the problems due to discrepancies between a non-linear and a linearized formulation. The proposed model covers realistic settings by allowing the blending of crude oil in storage tanks, by modeling storage tanks and relevant processing units individually, and by handling more crude oil types and quality...... parameters than in previous literature. The developed approach is tested using historical data from Statoil A/S as well as through a comprehensive numerical analysis. The approach generates a feasible procurement plan within acceptable computation time, is able to quickly adjust an existing plan to take...

  9. Ganges Valley Aerosol Experiment: Science and Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Kotamarthi, VR

    2010-06-21

    emissions; and dust. The extended AMF deployment will enable measurements under different regimes of the climate and aerosol abundance—in the wet monsoon period with low aerosol loading; in the dry, hot summer with aerosols dispersed throughout the atmospheric column; and in the cool, dry winter with aerosols confined mostly to the boundary later and mid-troposphere. Each regime, in addition, has its own distinct radiative and atmospheric dynamic drivers. The aircraft operational phase will assist in characterizing the aerosols at times when they have been observed to be at the highest concentrations. A number of agencies in India will collaborate with the proposed field study and provide support in terms of planning, aircraft measurements, and surface sites. The high concentration of aerosols in the upper Ganges Valley, together with hypotheses involving several possible mechanisms with direct impacts on the hydrologic cycle of the region, gives us a unique opportunity to generate data sets that will be useful both in understanding the processes at work and in providing answers regarding the effects of aerosols on climate in a region where the perturbation is the highest.

  10. Big Lake National Wildlife Refuge : Annual Water Management Plan : Calendar Year 1991

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Big Lake National Wildlife Refuge Water Management Plan has been developed to meet the station objectives set forth in the Master Plan. The purpose of this plan...

  11. Rocketdyne Propulsion and Power DOE Operations annual site environmental report 1997

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, K.S. [ed.

    1998-11-23

    This annual report discusses environmental monitoring at two manufacturing and test sites operated in the Los Angeles area by Rocketdyne Propulsion and Power of Boeing North American, Inc. These are identified as Area 4 of the SSFL and the De Soto site. These sites have been used for research and development (R and D), engineering, and testing in a broad range of technical fields primarily in energy research and nuclear reactor technology. The De Soto site had research and development laboratories involved with nuclear research. This work was terminated in 1995 and only D and D activities will have potential for impact on the environment. Since 1956, Area 4 has been used for work with nuclear materials, including fabricating nuclear reactor fuels, testing nuclear reactors, and dissembling used fuel elements. This work ended in 1988 and subsequent efforts have been directed toward decommissioning and decontamination of the former nuclear facilities. The primary purpose of this report is to present information on environmental and effluent monitoring of DOE-sponsored activities to the regulatory agencies responsible for oversight. Information presented here concentrates on Area 4 at SSFL, which is the only area at SSFL where DOE operations were performed.

  12. Guide for Developing High-Quality School Emergency Operations Plans

    Science.gov (United States)

    Office of Safe and Healthy Students, US Department of Education, 2013

    2013-01-01

    Each school day, our nation's schools are entrusted to provide a safe and healthy learning environment for approximately 55 million elementary and secondary school students in public and nonpublic schools. In collaboration with their local government and community partners, schools can take steps to plan for these potential emergencies through the…

  13. 77 FR 25577 - General Provisions; Operating and Strategic Business Planning

    Science.gov (United States)

    2012-05-01

    ... strategies or actions that extend beyond its marketplace and labor market; Develop marketing plans unless it... is, on equal opportunity and on decision-making unbiased by race, sex, or other inappropriate... characteristics. They stated that asking this information of potential employees or borrowers or making...

  14. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  15. Guide for Accredited Private School Education Planning and Results Reporting. Requirements for Three-Year Education Plans for 2007/08-2009/10 and Annual Education Results Reports for November 2007

    Science.gov (United States)

    Online Submission, 2007

    2007-01-01

    The Guide to Accredited Private School Education Planning and Results Reporting, 2007-2010 provides the provincial requirements for: 1) Private school authority three-year education plans for 2007-2010. These plans cover the 2007/08, 2008/09 and 2009/10 school years. 2) Private school authority annual education results report for the 2006/07…

  16. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  17. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1987-1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide Bonneville Power Administration (BPA) in carrying out our responsibility to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gave BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife were affected by the development and operation of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for Program implementation during Fiscal Year (FY) 1988. BPA's Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) reflects the primary goals of the Program's Action Plan: to provide a solid, timely, and focused basis for budgeting and planning. Additionally, BPA's Work Plan provides a means to judge progress and the success of Program implementation. This Work Plan has been organized and written to meet the specific needs of the Council's Action Plan, as described in Action Items 10.1-10.3. It includes schedules with key milestones for FY 1988 through FY 1990. The Work Plan is organized to address the Action Items assigned to BPA in Section 1400 of the 1987 Program.

  18. Tracking Trajectory Planning of Space Manipulator for Capturing Operation

    Directory of Open Access Journals (Sweden)

    Panfeng Huang

    2008-11-01

    Full Text Available On-orbit rescuing uncontrolled spinning satellite (USS using space robot is a great challenge for future space service. This paper mainly present a trajectory planning method of space manipulator that can track, approach and catch the USS in free-floating situation. According to the motion characteristics of USS, we plan a spiral ascending trajectory for space manipulator to approach towards USS in Cartesian space. However, it is difficult to map this trajectory into the joint space and realize feasible motion in joint space because of dynamics singularities and dynamics couple of space robot system. Therefore, we utilize interval algorithm to handle these difficulties. The simulation study verifies that the spiral ascending trajectory can been realized. Moreover, the motion of manipulator is smooth and stable, the disturbance to the base is so limited that the attitude control can compensate it.

  19. Mission Continuity Planning: Strategically Assessing and Planning for Threats to Operations.

    Science.gov (United States)

    Qayoumi, Mohammad H.

    This book covers the principles of risk and risk management and offers a framework for analyzing the significant, often unforeseen threats facing higher education institutions today. It examines the critical elements of a disaster preparedness plan and addresses business continuity and mission continuity planning. The book also provides tools for…

  20. Operations Research in a New Spanish Air Force Planning System

    Science.gov (United States)

    1991-06-01

    8. Gomez-Coll, Gen. Carlos. " Politica Area a corto y medio plazo," Revista de Aeronautica y Astronautica 569, pages 553-558 (May 1988). 9. Howard...Department of the Air Force. Basic Aerospace Doctrine of the United States Air Force. AFM 1-1. Washington: HQ USAF, March 1984. 5. Editorial. " Politica de...Defensa y Planeamiento Militar," Revista de Aeronautica y Astronautica 565 (January 1988). 6. Ferguson, Lt. Gen. Thomas R. "Requirements Planning

  1. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2013-10-01

    analytical frameworks—the Three-Tier Model ( TTM ) and three pillars for integrative success—to identify shortfalls and recom- mendations for...planning and execution phases (Yoder, 2011). Phase Zero Contracting Operations—The Three-Tier Model The TTM has specific personnel credentials in three...Fleischer » Keywords: Contingency, Expeditionary Contracting, Planning, Integrated Planner and Executor (IPE) Model , Adaptive Planning and

  2. Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, J.; Garrow, L.

    2009-05-26

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries

  3. Continuity of operations planning in college athletic programs: The case for incorporating Federal Emergency Management Guidelines.

    Science.gov (United States)

    Hall, Stacey A; Allen, Brandon L; Phillips, Dennis

    2016-01-01

    College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.

  4. 47{sup th} Annual meeting on nuclear technology (AMNT 2016). Key Topics / Enhanced safety and operation excellence

    Energy Technology Data Exchange (ETDEWEB)

    Bohnstedt, Angelika [Karlsruher Institut fuer Technologie (KIT), Eggenstein-Leopoldshafen (Germany). Programm Nukleare Entsorgung, Sicherheit und Strahlenforschung (NUSAFE); Baumann, Erik [AREVA GmbH, Erlangen (Germany). Radiation Protection

    2016-12-15

    Summary report on the Key Topic 'Enhanced Safety and Operation Excellence' Focus Session 'Radiation Protection' of the 47{sup th} Annual Meeting on Nuclear Technology (AMNT 2016) held in Hamburg, 10 to 12 May 2016. Other Sessions of AMNT 2016 have been and will be covered in further issues of atw.

  5. Fiscal Year 2009 Annual Report for Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater

    Energy Technology Data Exchange (ETDEWEB)

    Forsythe, Howard S.

    2010-04-10

    This annual report summarizes maintenance, monitoring, and inspection activities performed to implement the selected remedy for Waste Area Group 3, Operable Unit 3-14, Tank Farm soil and groundwater at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Results from monitoring perched water and groundwater at the Idaho Nuclear Technology and Engineering Center are also presented.

  6. Planning guide biomass conversion plants consisting of concrete. Planning, dimensioning and operation; Planungshilfe Biogasanlagen aus Beton. Planung, Bemessung, Ausfuehrung

    Energy Technology Data Exchange (ETDEWEB)

    Middel, Matthias (ed.)

    2013-08-01

    In recent years, the construction of biomass conversion plants for the production of clean energy experienced a boom. This boom will still continue for some years. The operation of biomass conversion plants imposes high demands on the construction. Simultaneously, the operators of biomass conversion plants expect a long trouble-free service life of their plants. Biogas plants consisting of concrete meet these requirements, if these are carefully planned and performed. The book under consideration provides the necessary expertise for this.

  7. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    KIRKBRIDE, R.A.

    2000-04-19

    This document updates the operating scenario and plans for feed delivery to BNFL Inc. of retrieval and waste from single-shell tanks, and the overall process flowsheets for Phases 1 and 2 of the River Protection Project. The plans and flowsheets are updated with the most recent guidance from ORP and tank-by-tank inventory. The results provide the technical basis for the RTP-2 planning effort. Sensitivity cases were run to evaluate the effect of changes on key parameters.

  8. Robust, Multi-layered Plan Execution and Revision for Operation of a Network of Communication Antennas

    Science.gov (United States)

    Chien, S. A.; Hill, R. W., Jr.; Govindjee, A.; Wang, X.; Estlin, T.; Griesel, M. A.; Lam, R.; Fayyad, K. V.

    1996-01-01

    This paper describes a hierarchical scheduling, planning, control, and execution monitoring architecture for automating operations of a worldwide network of communications antennas. The purpose of this paper is to describe an architecture for automating the process of capturing spacecraft data.

  9. Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    In this report unified ideas are presented about what the Office of International Health Programs does, what the individual contributions are, and how the organization connects to the Department of Energy. The planning efforts have focused on the office`s three areas of responsibility: Europe, Japan, and the Marshall Islands. Common to each technical program area are issues related to the following: health of populations exposed to radiation incidents and the associated medical aspects of exposure; dose reconstruction; training; and public involvement. Each of the program areas, its customers, and primary customer interests are described.

  10. Implementation plan for the Operations Center Upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed.

  11. Operable Unit C Remedial Investigation Sampling and Analysis Plan

    Science.gov (United States)

    1994-05-02

    RI will be brought to the attention of the Well Abandonmetnt Team so they can be properly decommissioned . 1.3 Updates to the OU C RI SAP As the current...OUcsA•2I•r2944a 5.1-7 TABLE 5.1-2. (Continued) DATA QUALITY OBJECTIVES FOR PFR 65 Problen Statenent If hazardous materials were disposed at PRL 65, the...Summary: Decommissioning plans for BW-6, BW-16, and boring DEB-C1 (possible conduits for contaminant migration) should be provided. Response: Text has been

  12. Plans for a German Grid Operations and Support Centre

    Science.gov (United States)

    Reißer, Sabin

    The German grid initiative D-Grid brings together various scientific and commercial projects in fields like medicine, engineering, banking, meteorology using the same grid infrastructure. In this infrastructure, which comprises more than 30 computing centres, three middleware stacks (gLite, Globus and Unicore) are deployed and used by the various communities. This variety of applications as well as of middleware calls for well organised operations and support. The German Grid Operations and Support Centre (GOSC) aim to answer this challenge and also provides an uplink to international activities like EGI. The GOSC will provide middleware services like reference installations for the various middleware flavours. It will manage the national grid operations (regional monitoring, SLA enforcement) and will be responsible for providing VO and user services, like application support and a helpdesk.

  13. Lessons learned from the Hubble Space Telescope planning and scheduling system implementation and operation

    Science.gov (United States)

    Ruitberg, Edward O.; Ondrus, Paul J.

    1990-01-01

    The major challenge of the NASA Hubble Space Telescope (HST) Ground System has been the implementation of the planning and scheduling system. This paper describes the operational flow of HST from science proposals to the actual execution of science observations on board the HST. The paper provides a collection of lessons learned over the 10 years that have covered the definition, development, test, and initial operation of HST's planning and scheduling system.

  14. 22 CFR 506.4 - Annual goals and timetables.

    Science.gov (United States)

    2010-04-01

    ... Foreign Relations BROADCASTING BOARD OF GOVERNORS PART-TIME CAREER EMPLOYMENT PROGRAM § 506.4 Annual goals and timetables. A Board-wide plan for promoting part-time employment opportunities will be developed annually by the Office of Personnel after consultation with the operating elements. This plan...

  15. Environmental Protection Department, Operations and Regulatory Affairs Division, LLNL NESHAPs 2006 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Larson, J; Peterson, S; Wilson, K R

    2007-06-20

    NESHAPs limits the emission of radionuclides to the ambient air from DOE facilities to levels resulting in an annual effective dose equivalent (EDE) of 10 mrem (100 {micro}Sv) to any member of the public. The EDEs for the Lawrence Livermore National Laboratory (LLNL) site-wide maximally exposed members of the public from operations in 2006 are summarized here. Livermore site: 0.0045 mrem (0.045 {micro}Sv) (36% from point source emissions, 64% from diffuse source emissions). The point source emissions include gaseous tritium modeled as tritiated water vapor as directed by the U.S. Environmental Protection Agency (EPA) Region IX; the resulting dose is used for compliance purposes. Site 300: 0.016 mrem (0.16 {micro}Sv) (87.5% from point source emissions, 12.5% from diffuse source emissions). The EDEs were calculated using the EPA-approved CAP88-PC air dispersion/dose-assessment model, except for doses for two diffuse sources that were estimated using measured radionuclide concentrations and dose coefficients. Specific inputs to CAP88-PC for the modeled sources included site-specific meteorological data and source emissions data, the latter variously based on continuous stack effluent monitoring data, stack flow or other release-rate information, ambient air monitoring data, and facility knowledge.

  16. 30 CFR 780.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... showing that the risk of harm to the environment or to public health or safety is not significant during... Section 780.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS...

  17. 30 CFR 784.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... showing that the risk of harm to the environment or to public health or safety is not significant during... Section 784.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS...

  18. 76 FR 30280 - General Provisions; Operating and Strategic Business Planning

    Science.gov (United States)

    2011-05-25

    ... eligible and creditworthy borrowers includes men and women from a variety of racial and ethnic backgrounds... consists of producers who operate within local food systems, which typically involve small farmers... to the 2007 U.S. Census of Agriculture, most farms that sell directly to consumers are small...

  19. 36 CFR 9.36 - Plan of operations.

    Science.gov (United States)

    2010-07-01

    ... engineer shall be marked with a permanent ground monument acceptable to the Superintendent, shall contain... regulations; (16) Background information, including: (i) A description of the natural, cultural, social and... indirect effects of the operations on the unit's natural, cultural, social, and economic environment;...

  20. Georgia-Pacific: Crossett Mill Identifies Heat Recovery Projects and Operational Improvements that May Save $9.6 Million Annually

    Energy Technology Data Exchange (ETDEWEB)

    2003-11-01

    An assessment team conducted a mill-wide energy survey at Georgia-Pacific's Crossett, Arkansas mill to update a previous pinch analysis. Three heat recovery projects were identified that could reduce annual costs by $4.8 million and reduce natural gas use by 1,845,000 x 106 Btu. The overall payback period for the heat recovery projects would be less than 1 year. Furthermore, by implementing operational improvements, the mill could save $4.8 million more annually and 1,500,000 x 106 Btu in natural gas.

  1. Tewaukon National Wildlife Refuge Complex: 1991 Annual Water Management Plan and 1990 Use Report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is the water use report/management plan for Tewaukon National Wildlife Refuge Complex for 1991-1990. The plan includes discussion on water rights,...

  2. Tewaukon National Wildlife Refuge Complex: 1995 Annual Water Management Plan and 1994 Use Report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This document is the water use report/management plan for Tewaukon National Wildlife Refuge Complex for 1995-1994. The plan includes discussion on water rights,...

  3. Probabilistic tools for planning and operating power systems with distributed energy storage

    DEFF Research Database (Denmark)

    Klöckl, Bernd; Papaefthymiou, George; Pinson, Pierre

    2008-01-01

    Stochastic energy flows are an increasingly important phenomenon in today's power system planning and operation. They are – among other reasons – caused by large amounts of stochastic generation such as wind. The inclusion of energy storage devices, distributed in future systems (distributed energy...... owners are either the grid operators, the generation owners, or the energy traders. For the grid operators being the DES owners, storage operation will have to be integrated into the planning of the system, therefore multivariate nonparametric time series analysis and synthesis methods have to be applied...... to recorded data of stochastic energy resources. Together with suited storage models, the implications of DES on the planning of the system can then be assessed. For the producers or traders being the owners of the DES, the topic to be addressed is the real-time operation of each storage device in the power...

  4. Inventory and Monitoring (I&M) Initiative FY 2012 Annual Report and FY 2013 Work Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This annual report describes implementation of the National Wildlife Refuge System's Inventory and Monitoring (I results from all eight regions and the I&M...

  5. WP3 Prototype development for operational planning tool

    DEFF Research Database (Denmark)

    Kristoffersen, Trine; Meibom, Peter; Apfelbeck, J.

    of electricity load and wind power production, and to cover forced outages of power plants and transmission lines. Work has been carried out to include load uncertainty and forced outages in the two main components of the Wilmar Planning tool namely the Scenario Tree Tool and the Joint Market Model. This work...... is documented in chapter 1 and 2. The inclusion of load uncertainty and forced outages in the Scenario Tree Tool enables calculation of the demand for reserve power depending on the forecast horizon. The algorithm is given in Section 3.1. The design of a modified version of the Joint Market Model enabling....... Further, the methodology to identify extreme events on the basis of the existing tools is described. Within the SUPWIND consortium there has been an interest in using the Joint Market Model to model smaller parts of a power system but with more detailed representation of the transmission and distribution...

  6. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    KIRKBRIDE, R.A.

    1999-05-04

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.

  7. U.S. Department of Energy Office of Inspector General fiscal year 1999 annual performance plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    This plan is published pursuant to requirements of the Government Performance and Results Act of 1993. The plan outlines the goals, objectives, and strategies that the Office of Inspector General intends to implement and execute in FY 1999. The plan also includes the details of this office`s efforts to continually improve customer service.

  8. Operations of and Future Plans for the Pierre Auger Observatory

    Energy Technology Data Exchange (ETDEWEB)

    Abraham, : J.; Abreu, P.; Aglietta, M.; Aguirre, C.; Ahn, E.J.; Allard, D.; Allekotte, I.; Allen, J.; Alvarez-Muniz, J.; Ambrosio, M.; Anchordoqui, L.

    2009-06-01

    These are presentations to be presented at the 31st International Cosmic Ray Conference, in Lodz, Poland during July 2009. It consists of the following presentations: (1) Performance and operation of the Surface Detectors of the Pierre Auger Observatory; (2) Extension of the Pierre Auger Observatory using high-elevation fluorescence telescopes (HEAT); (3) AMIGA - Auger Muons and Infill for the Ground Array of the Pierre Auger Observatory; (4) Radio detection of Cosmic Rays at the southern Auger Observatory; (5) Hardware Developments for the AMIGA enhancement at the Pierre Auger Observatory; (6) A simulation of the fluorescence detectors of the Pierre Auger Observatory using GEANT 4; (7) Education and Public Outreach at the Pierre Auger Observatory; (8) BATATA: A device to characterize the punch-through observed in underground muon detectors and to operate as a prototype for AMIGA; and (9) Progress with the Northern Part of the Pierre Auger Observatory.

  9. Planning, Investment, Construction and Operation of Rail Transit in Beijing

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    In Beijing, the rail transit firstly came into existence in the mid 1960s and was officially put into operation for civil use in the early 1980s. It has entered a period of rapid development since 2001, with thanks to the coming of the Olympic Games in 2008, and has been playing a more and more important role in the passenger transport of Beijing since then on, as a key part of the public transportation. Based on a resume on the evolution of rail transit development in Beijing, this paper analyzes the mechanism of policy-making, the mode of investment and financing, the procedure of construction, and the management of operation of rail transit, all of which ensure its rapid development and effective performance.

  10. 4TH Marine Division Operation Plan Number 49-44

    Science.gov (United States)

    1944-12-26

    The SFCP irill then designate the letter to be keyed by beacon during tuning. (c) If other means of Corn fail, spots may be transmitted by manually ...provisions of Staff Officer’s Field Manual for Amphibious Operations. 2. The Division Shore Party will be comprised of units or elements thereof as...Annex "Ain to Division administrativo Order Nio, 43-44, (Reviej)) . (4) Repai~, section to provide 2d, 3d and 4th echelon mainteniaince for Engineer

  11. Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)

    Science.gov (United States)

    Qureshi, Rizwan Hamid; Hughes, Steven P.

    2014-01-01

    The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

  12. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  13. Motion and operation planning of robotic systems background and practical approaches

    CERN Document Server

    Gomez-Barvo, Fernando

    2015-01-01

    This book addresses the broad multi-disciplinary topic of robotics, and presents the basic techniques for motion and operation planning in robotics systems. Gathering contributions from experts in diverse and wide ranging fields, it offers an overview of the most recent and cutting-edge practical applications of these methodologies. It covers both theoretical and practical approaches, and elucidates the transition from theory to implementation. An extensive analysis is provided, including humanoids, manipulators, aerial robots and ground mobile robots. ‘Motion and Operation Planning of Robotic Systems’ addresses the following topics: *The theoretical background of robotics. *Application of motion planning techniques to manipulators, such as serial and parallel manipulators. *Mobile robots planning, including robotic applications related to aerial robots, large scale robots and traditional wheeled robots. *Motion planning for humanoid robots. An invaluable reference text for graduate students and researche...

  14. Mitigation for the Construction and Operation of Libby Dam, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James L.; Marotz, Brian L.; DeShazer, Jay (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2003-06-01

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to ''protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries...'' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May, 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to

  15. A Test Platform for Planned Field Operations Using LEGO Mindstorms NXT

    Directory of Open Access Journals (Sweden)

    Gareth Edwards

    2013-11-01

    Full Text Available Testing agricultural operations and management practices associated with different machinery, systems and planning approaches can be both costly and time-consuming. Computer simulations of such systems are used for development and testing; however, to gain the experience of real-world performance, an intermediate step between simulation and full-scale testing should be included. In this paper, a potential common framework using the LEGO Mindstorms NXT micro-tractor platform is described in terms of its hardware and software components. The performance of the platform is demonstrated and tested in terms of its capability of supporting decision making on infield operation planning. The proposed system represents the basic measures for developing a complete test platform for field operations, where route plans, mission plans, multiple-machinery cooperation strategies and machinery coordination can be executed and tested in the laboratory.

  16. Cautious but committed: moving toward adaptive planning and operation strategies for renewable energy's wildlife implications.

    Science.gov (United States)

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned-creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  17. Using Critical Problem Solving to Plan Inter-Organisational Co-operation in e-Customs

    NARCIS (Netherlands)

    Ponisio, M.L.; Eck, van P.A.T.; Riemens, L.

    2008-01-01

    The purpose of this paper is to present a systematic approach to plan assessment of electronic co-operation between customs organisations of different countries (e-Customs). Thorough assessment is of paramount importance, as co-operation in electronic networks usually requires considerable up-front

  18. CARES: Carbonaceous Aerosol and Radiative Effects Study Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zaveri, RA; Shaw, WJ; Cziczo, DJ

    2010-07-12

    The CARES field campaign is motivated by the scientific issues described in the CARES Science Plan. The primary objectives of this field campaign are to investigate the evolution and aging of carbonaceous aerosols and their climate-affecting properties in the urban plume of Sacramento, California, a mid-size, mid-latitude city that is located upwind of a biogenic volatile organic compound (VOC) emission region. Our basic observational strategy is to make comprehensive gas, aerosol, and meteorological measurements upwind, within, and downwind of the urban area with the DOE G-1 aircraft and at strategically located ground sites so as to study the evolution of urban aerosols as they age and mix with biogenic SOA precursors. The NASA B-200 aircraft, equipped with the High Spectral Resolution Lidar (HSRL), digital camera, and the Research Scanning Polarimeter (RSP), will be flown in coordination with the G-1 to characterize the vertical and horizontal distribution of aerosols and aerosol optical properties, and to provide the vertical context for the G-1 and ground in situ measurements.

  19. Collaborative task planning for an internet based multi-operator multi-robot system

    Institute of Scientific and Technical Information of China (English)

    GAO Sheng; ZHAO Jie; CAI He-gao

    2005-01-01

    In an Internet based multi-operator and multi-robot system (IMOMR), operators have to work collaboratively to overcome the constraints of space and time. Inherently, the activities among them can be defined as a computer-supported cooperative work (CSCW). As a practical application of CSCW, a collaborative task planning system (CTPS) for IMOMR is proposed in this paper on the basis of Petri nets. Its definition, components design, and concrete implementation are given in detail, respectively. As a result, a clear collaboration mechanism of multiple operators in an IMOMR is obtained to guarantee their task planning.

  20. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L.; Tuffner, Francis K.; Hadley, Mark D.; Kreyling, Sean J.; Schneider, Kevin P.

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  1. Stochastic Methods for Planning and Operating Power Systems with Large Amounts of Wind and Solar Power: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, M.; Donohoo, P.; O' Malley, M.

    2012-09-01

    Wind and solar generators differ in their generation characteristics than conventional generators. The variable output and imperfect predictability of these generators face a stochastic approach to plan and operate the power system without fundamentally changing the operation and planning problems. This paper overviews stochastic modeling challenges in operations, generation planning, and transmission planning, with references to current industry and academic work. Different stochastic problem formulations, including approximations, are also discussed.

  2. Stock-based vs. fleet-based evaluation of the multi-annual management plan for the cod stocks in the Baltic Sea

    DEFF Research Database (Denmark)

    Bastardie, Francois; Vinther, Morten; Nielsen, J. Rasmus

    2010-01-01

    This study evaluated the EU 2008 multi-annual plan for Baltic cod stock recovery. The plan combines harvest control rules that set TACs with reductions in direct effort (E) and fishing mortality (F). Performance and robustness of the plan are tested with a management strategy evaluation model (MS....... Medium term economic evaluation of fishery performance shows an initial reduction in profit with effort and TAC reductions, but profit is always positive. (C) 2009 Elsevier B.V. All rights reserved.......This study evaluated the EU 2008 multi-annual plan for Baltic cod stock recovery. The plan combines harvest control rules that set TACs with reductions in direct effort (E) and fishing mortality (F). Performance and robustness of the plan are tested with a management strategy evaluation model (MSE...

  3. ’Winning the War’: Planning for Integrated, Synchronized, and Simultaneous Operations

    Science.gov (United States)

    2004-01-01

    environment that would permit the reestablishment of the legitimate government of President Aristide, . . . “neutralize the Haitian Army ( FAdH ) and to...know’ requirement. 47 Ibid., 16. 19 airport. The plan envisioned airborne, amphibious, and air assaults to neutralize the FAdH and police, secure...special operations task force (JSOTF) capturing the FAdH headquarters in Port Au Prince.48 After the initial operations, the Joint Special Operations

  4. 46{sup th} Annual meeting on nuclear technology (AMNT 2015). Key topic / Enhanced safety and operation excellence / Sustainable reactor operation management - safe, efficient, valuable

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, Erwin [E.ON Kernkraft GmbH, Global Unit Next Generation, Hannover (Germany)

    2015-08-15

    Summary report on the following Topical Session of the 46{sup th} Annual Conference on Nuclear Technology (AMNT 2015) held in Berlin, 5 to 7 May 2015: - Sustainable Reactor Operation Management - Safe, Efficient, Valuable (Erwin Fischer) The other Sessions of the Key Topics - ''Outstanding Know-How and Sustainable Innovations'', - ''Enhanced Safety and Operation Excellence'' and - ''Decommissioning Experience and Waste Management Solutions'' have been covered in atw 7 (2015) and will be covered in further issues of atw.

  5. Stillwater National Wildlife Refuge and Stillwater Wildlife Management Area Annual Water Management Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — An estimated 70,000 acre feet(AF) of water are needed annually to maintain 14,000 acres of marsh currently administered by the Stillwater NWR. The 1993 water...

  6. Predicting changes in blood flow in patient-specific operative plans for treating aortoiliac occlusive disease.

    Science.gov (United States)

    Wilson, Nathan M; Arko, Frank R; Taylor, Charles A

    2005-07-01

    Traditionally, a surgeon will select a procedure for a particular patient on the basis of past experience with patients with a similar state of disease. The experience gained from this patient will be selectively used when treating the next patient with similar symptoms. This article describes a surgical planning system that was developed to enable a vascular surgeon to create and test alternative operative plans prior to surgery for a given patient. One-dimensional and three-dimensional hemodynamic (i.e., blood flow) simulations were performed for rest and exercise for operative plans for two aorto-femoral bypass patients and compared with actual postoperative data. The information obtained from one-dimensional (volume flow distribution and pressure losses) and three-dimensional (flow, pressure, and wall shear stress) hemodynamic simulations may be clinically relevant to vascular surgeons planning interventions.

  7. Predicting Correct Body Posture based on Theory of Planned Behavior in Iranian Operating Room Nurses

    OpenAIRE

    BAHAREH ABEDI; RABIOLLAH FARMANBAR1; SAEED OMIDI; MAHDI JAHANGIR BLOURCHIAN

    2015-01-01

    Due to the importance of correct posture for preventing musculoskeletal disorders, the purpose of this study was to evaluate Theory of Planned Behavior in Predicting correct Body Posture in operating room nurses.In this cross-sectional study, participants (n=100) were nurses from five hospitals located in northern Iran. Participants completed demographic data and theory of planned behavior construct Questionnaires. In addition, the researcher checked the Body Posture of nurses by Rapid Entire...

  8. Information Operations Versus Civilian Marketing and Advertising: A Comparative Analysis to Improve IO Planning and Strategy

    Science.gov (United States)

    2008-03-01

    OPERATIONS VERSUS CIVILIAN MARKETING AND ADVERTISING : A COMPARATIVE ANALYSIS TO IMPROVE IO PLANNING AND STRATEGY by Dan Chilton March 2008...tactics may be much more suited to achieve this through the use of civilian marketing and advertising fundamentals to organize, plan, and execute IO...strategy. The objective of this work is to analyze and develop the concept of utilizing civilian advertising and marketing fundamentals for

  9. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  10. Annual Water Management Plan Parts I and II : Mark Twain National Wildlife Refuge : Brussels District

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The Mark Twain National Wildlife Refuge Water Management Plan aims to develop a practical schedule for water management on the Calhoun, Batchtown and Gilbert Lake...

  11. Colorado geothermal commercialization planning. Semi-annual progress report, January 1, 1979-June 30, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Coe, B.A.

    1979-01-01

    The potential for developing the geothermal resources of Colorado is detailed. Constraints that are limiting geothermal energy development are described. Area development plans, an institutional analysis, and the outreach program are presented. (MHR)

  12. 2006-07 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Parker River NWR recently completed a Habitat Management Plan, which will guide the management of the wildlife and habitats on the Refuges for the next 15 years. The...

  13. 2009-2010 Annual Habitat Work Plan : Parker River National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In 2006, Parker River NWR completed a Habitat Management Plan, which will guide the management of the wildlife and habitats on the Refuges for the next 15 years. The...

  14. Deputy Inspector General for audit services. FY 1998 annual performance plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-30

    This plan outlines the audie strategies that the Deputy Inspector General for Audit Services intends to implement and execute in Fiscal Year (FY) 1998. The plan also includes the details of efforts to improve customer service and to implement the Inspector General`s streamlining initiatives. The FY 1997/1998 Strategic Plan emphasizes six key issue areas: Financial Management, Contract Administration, Program Management, Environmental Quality, Infrastructure and Administrative Safeguards. These issue areas were chosen to ensure that the Inspector General`s audit, inspection, and investigative functions are focused to assist the Department to reach its goals, pursue its strategies, and monitor its success indicators. This plan also establishes goals, objectives, and performance measures, which are discussed in detail in Appendix I.

  15. APA guidelines: their importance and a plan to keep them current: 2013 annual report of the Policy and Planning Board.

    Science.gov (United States)

    2014-01-01

    When guidelines are approved by APA, they become association policy, and it is imperative that they remain current. The revision of guidelines poses several challenges to the association. These challenges range from the availability and allocation of resources to support the complicated processes involved in developing and updating these policies to the lack of a clearly defined process that includes identification of tasks, assignments of responsibilities, and so forth. For this reason, the APA Board of Directors asked the Policy and Planning Board (P&P) to work with the boards of the four directorates (i.e., the Education Directorate, the Practice Directorate, the Public Interest Directorate, and the Science Directorate) to create a proposal that would (a) make recommendations with regard to how the review and revision of guidelines documents might best be accomplished in accordance with the APA Strategic Plan and existing policies and procedures and (b) make suggestions regarding the association resources that might be required. The Board of Directors approved the proposed review process in December 2013.

  16. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2004-01-01

    Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of

  17. Northeast Artificial Intelligence Consortium Annual Report 1987. Volume 2, Part B. Discussing, Using, and Recognizing Plans

    Science.gov (United States)

    1989-03-01

    1978. Williams. B.C. Qualitative Analysis of MOS Circuits. Artificial Inteligence . 1984. 24.. Wilson. K. From Association to Structure. Amsterdam:North...D-A208 378 RADC-TR-88-324, Vol II (of nine), Part B Interim Report March 1969 4. NORTHEAST ARTIFICIAL INTELLIGENCE CONSORTIUM ANNUAL REPORT 1987...II (of nine), Part B 6a. NAME OF PERFORMING ORGANIZATION 6b. OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION Northeast Artificial (ff ’aolicbl

  18. Northeast Artificial Intelligence Consortium Annual Report. Volume 2. 1988 Discussing, Using, and Recognizing Plans (NLP)

    Science.gov (United States)

    1989-10-01

    Encontro Portugues de Inteligencia Artificial (EPIA), Oporto, Portugal, September 1985. [15] N. J. Nilsson. Principles Of Artificial Intelligence. Tioga...FI1 F COPY () RADC-TR-89-259, Vol II (of twelve) Interim Report October 1969 AD-A218 154 NORTHEAST ARTIFICIAL INTELLIGENCE CONSORTIUM ANNUAL...7a. NAME OF MONITORING ORGANIZATION Northeast Artificial Of p0ilcabe) Intelligence Consortium (NAIC) Rome_____ Air___ Development____Center

  19. The Role of the Media in The Operational Deception Plan for Operation Desert Storm

    Science.gov (United States)

    1992-04-01

    Schwarzkopf. 60 John M,Broger, "Schwarzkoi0f’s War Plan Based on Deception Los Anodeles Times, 28 Feb. 1991, Sec. A, p. 16. 61 Tim Wqiner.awR’ceotlon Decoys...1991, p. Iz. 117 For one example of this, see Mike Tharp , ’Desert B!:-1..., U.S. News & World Recort, 18 Feb. 1991 p. 14. The article Iieteo a town...It or Not News Media are Needed.’ Air Force Times, 19 Aug. 1991, p. 63. Tharp Mike. ’Desert Bloom.’ U.S. News & World Report, 18 Feb. 1991, p. l4o

  20. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  1. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.

    2011-01-01

    In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow

  2. Applying the Art of Systems and Organizational Architecting in Order to Implement Operational Design into Marine Corps Planning Doctrine

    Science.gov (United States)

    2011-09-01

    Making Process OEF Operation Enduring Freedom OIF Operational Iraqi Freedom OPORDS Operational Orders RSE Rapid Systems Engineering TTPs Tactics...and Complexity, A Platform for Designing Business Architecture and elements of Rapid Systems Engineering ( RSE ) as applied by Professor Gary Langford...planning process combines elements of business design (Gharajedaghi, 2006) and RSE (Langford, 2006) to create a more robust design-planning continuum

  3. Systemic Operational Design: Improving Operational Planning for the Netherlands Armed Forces

    Science.gov (United States)

    2006-05-25

    This methodology is called Soft Systems Methodology . His methodology is a structured way of thinking in which not only a perceived problematic...Many similarities exist between Systemic Operational Design and Soft Systems Methodology , their epistemology is related. Furthermore, they both have...Systems Thinking: Managing Chaos and Complexity. Boston: Butterworth Heinemann, 1999. Checkland, Peter, and Jim Scholes. Soft Systems Methodology in

  4. Facility Safety Plan B360 Complex Biohazardous Operations CMLS-412r0

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, G

    2007-01-08

    This Addendum to the Facility Safety Plan (FSP) 360 Complex describes the safety requirements for the safe conduct of all biohazardous research operations in all buildings within the 360 complex program areas. These requirements include all the responsibilities and authorities of building personnel, operational hazards, and environmental concerns and their controls. In addition, this Addendum prescribes facility-specific training requirements and emergency controls, as well as maintenance and quality assurance requirements for ES&H-related building systems.

  5. Identification of Decision Support Concepts for the Planning of Air Force Immediate Contingencies Operations

    Science.gov (United States)

    2010-03-01

    Identification of Decision Support Concepts for the Planning of Air Force Immediate Contingencies Operations 1 March 2010 Anet Greenley , Sylvain...K2K 3G7 Project Manager: Anet Greenley , 613-290-0751 Contract number (in full): W7701-054996/009/QCL (W7701-8-3522NP) Contract Scientific...Operations 1 March 2010 Anet Greenley , Sylvain Pronovost, Dennis Kelleher, John Graham, Peter Race and Patrick Lachance. CAE Professional Services 1135

  6. Foresight for commanders: a methodology to assist planning for effects-based operations

    Science.gov (United States)

    Davis, Paul K.; Kahan, James P.

    2006-05-01

    Looking at the battlespace as a system of systems is a cornerstone of Effects-Based Operations and a key element in the planning of such operations, and in developing the Commander's Predictive Environment. Instead of a physical battleground to be approached with weapons of force, the battlespace is an interrelated super-system of political, military, economic, social, information and infrastructure systems to be approached with diplomatic, informational, military and economic actions. A concept that has proved useful in policy arenas other than defense, such as research and development for information technology, addressing cybercrime, and providing appropriate and cost-effective health care, is foresight. In this paper, we provide an overview of how the foresight approach addresses the inherent uncertainties in planning courses of action, present a set of steps in the conduct of foresight, and then illustrate the application of foresight to a commander's decision problem. We conclude that foresight approach that we describe is consistent with current doctrinal intelligence preparation of the battlespace and operational planning, but represents an advance in that it explicitly addresses the uncertainties in the environment and planning in a way that identifies strategies that are robust over different possible ground truths. It should supplement other planning methods.

  7. Condition-based dynamic maintenance operations planning and grouping. Application to commercial heavy vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Bouvard, K., E-mail: keomany.bouvard@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France); Artus, S., E-mail: samuel.artus@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Berenguer, C., E-mail: christophe.berenguer@utt.f [Universite de technologie de Troyes - Institut Charles Delaunay and UMR CNRS 6279 - 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Cocquempot, V., E-mail: vincent.cocquempot@univ-lille1.f [Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France)

    2011-06-15

    This paper aims at presenting a method to optimize the maintenance planning for a commercial heavy vehicle. Such a vehicle may be considered as a multi-components system. Grouping maintenance operations related to each component reduces the global maintenance cost of the system. Classically, the optimization problem is solved using a priori reliability characteristics of components. Two types of methods may be used, i.e. static or dynamic methods. Static methods provide a fixed maintenance planning, whereas dynamic methods redefine the groups of maintenance operations at each decision time. Dynamic procedures can incorporate component information such as component states or detected failures. For deteriorating systems, reliability characteristics of each component may be estimated thanks to deterioration models and may be updated when a degradation measure is available. This additional information on degradation features allows to better follow the real state of each component and to improve the maintenance planning.

  8. Advanced software development workstation: Object-oriented methodologies and applications for flight planning and mission operations

    Science.gov (United States)

    Izygon, Michel

    1993-01-01

    The work accomplished during the past nine months in order to help three different organizations involved in Flight Planning and in Mission Operations systems, to transition to Object-Oriented Technology, by adopting one of the currently most widely used Object-Oriented analysis and Design Methodology is summarized.

  9. Plan for the Startup of HA-21I Furnace Operations at the Plutonium Finishing Plant (PFP)

    Energy Technology Data Exchange (ETDEWEB)

    WILLIS, H.T.

    2000-02-17

    Achievement of Thermal Stabilization mission elements require the installation and startup of three additional muffle furnaces for the thermal stabilization of plutonium and plutonium bearing materials at the Plutonium Finishing Plant (PFP). The release to operate these additional furnaces will require an Activity Based Startup Review. The conduct of the Activity Based Startup Review (ABSR) was approved by Fluor Daniel Hanford on October 15, 1999. This plan has been developed with the objective of identifying those activities needed to guide the controlled startup of five furnaces from authorization to unrestricted operations by adding the HA-211 furnaces in an orderly and safe manner after the approval to Startup has been given. The Startup Plan provides a phased approach that bridges the activities between the completion of the Activity Based Startup Review authorizing the use of the three additional furnaces and the unrestricted operation of the five thermal stabilization muffle furnaces. The four phases are: (1) the initiation of five furnace operations using three empty (simulated full) boat charges from HA-211 and two full charges from HC-21C; (2) three furnace operations (one full charge from HA-211 and two full charges from HC-21C); (3) four furnace operations (two full charges from HA-211 and two full charges from HC-21C); and (4) integrated five furnace operations and unrestricted operations. Phase 1 of the Plan will be considered as the cold runs. This Plan also provides management oversight and administrative controls that are to be implemented until unrestricted operations are authorized. It also provides a formal review process for ensuring that all preparations needed for full five furnace operations are completed and formally reviewed prior to proceeding to the increased activity levels associated with five furnace operations. Specific objectives include: (1) To ensure that activities are conducted in a safe manner. (2) To provide supplemental

  10. Using operations research to plan the british columbia registered nurses' workforce.

    Science.gov (United States)

    Lavieri, Mariel S; Regan, Sandra; Puterman, Martin L; Ratner, Pamela A

    2008-11-01

    The authors explore the power and flexibility of using an operations research methodology known as linear programming to support health human resources (HHR) planning. The model takes as input estimates of the future need for healthcare providers and, in contrast to simulation, compares all feasible strategies to identify a long-term plan for achieving a balance between supply and demand at the least cost to the system. The approach is illustrated by using it to plan the British Columbia registered nurse (RN) workforce over a 20-year horizon. The authors show how the model can be used for scenario analysis by investigating the impact of decreasing attrition from educational programs, changing RN-to-manager ratios in direct care and exploring how other changes might alter planning recommendations. In addition to HHR policy recommendations, their analysis also points to new research opportunities.

  11. New problem with sales, inventories, and operations planning in a supply chain environment

    Science.gov (United States)

    Thomas, Andre; Lamouri, Samir

    2000-10-01

    The highest level of planning and control system is necessary, because production and logistics systems are not so flexible to follow, from day to day, sales evolutions. The companies are therefore held to standardize the good practices concerning the elaboration of their Sales, Inventories and Operations Planning (SIOP). The SIOP makes it possible to implement the strategic objectives defined by Top Management at the time of the Business Plan. It is the link between sales and manufacturing planning. The objectives of each of those depend on the specificity of their trade: the Sales Department will go for a maximum sales whereas Production will endeavor to keep industrial cost prices as low as possible while the Finance Department will try to optimize the use of available funds. There are several tools for this optimization: Graphical method and linear programming. Today, the economic context requires robust optimization.

  12. Proceedings of the 31. annual British Columbia mine reclamation symposium : rejuvenation through reclamation and operating for closure

    Energy Technology Data Exchange (ETDEWEB)

    Price, W.; Dixon, B.; Fraser, C.; Freberg, M.; Davidson, S.; Hart, B.; Jarman, P.; Wambolt, T.; Hamaguchi, B.; Howell, C.; Bellefontaine, K.; Bose, S. (eds.)

    2007-07-01

    This annual symposium fosters the exchange of information on mine reclamation, including metal mines, coal mines, placer operations, sand and gravel operations and quarry operations. The presentations addressed a wide variety of environmental and reclamation issues associated with mine development as well as the rehabilitation of lands disturbed by resource exploration. Studies have shown that it is possible to minimize or eliminate environmental damage in all types of terrain by using appropriate remedial methods such as revegetation, reforestation, soil conservation, resloping, and recontouring of the soil to return the ecosystem to a natural self-sustaining state. Revegetation and reforestation efforts usually involve the selection of appropriate species that will adapt to climatic and local soil conditions. The conference featured 23 presentations, of which 3 have been catalogued separately for inclusion in this database. refs., tabs., figs.

  13. Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B.

    2001-04-30

    The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  14. 78 FR 48159 - Preliminary 2012 Effluent Guidelines Program Plan and 2011 Annual Effluent Guidelines Review Report

    Science.gov (United States)

    2013-08-07

    ... captured and included as part of the comment that is placed in the public docket and made available on the... delist from the effluent guidelines plan the rulemaking for the Coalbed Methane Extraction subcategory... Regenerated Cellulose Manufacturers (previously categorized as Plastics Molding and Forming (40 CFR Part...

  15. Heat pumps: planning, optimisation, operation and maintenance; Waermepumpen. Planung - Optimierung - Betrieb - Wartung

    Energy Technology Data Exchange (ETDEWEB)

    Kunz, P. [Kunz-Beratungen, Dietlikon (Switzerland); Afjei, T. [Fachhochschule Nordwestschweiz, Institut fuer Energie am Bau, Muttenz (Switzerland); Betschart, W.; Prochaska, V. [Hochschule Luzern, Technik und Architektur, Horw (Switzerland); Hubacher, P. [Hubacher Engineering, Engelburg (Switzerland); Loehrer, R. [Scheco AG, Winterthur (Switzerland); Mueller, A. [Mueller und Pletscher AG, Winterthur (Switzerland)

    2008-01-15

    This handbook issued by the Swiss Federal Office of Energy (SFOE) in co-operation with a trade publication takes a look at the planning, optimisation, operation and maintenance of heat pumps. First of all, the basics of heat pump technology, heat pump components and refrigerants are discussed. Then, heat sources and heat distribution are looked at, followed by chapters on the integration of heat pumps into heating systems and noise protection topics. The definition of projects, commissioning and operation of heat pump systems are then discussed. Examples of installations round off the handbook.

  16. Industrial Fuel Gas Demonstration Plant Program. Demonstration plant operation plan (Deliverable No. 38)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    The Demo Plant Operating Plan is composed of the following sequence of events starting with the training or personnel, familiarizing of the personnel with the plant and completing the long-term run in the following sequences: inspection during construction, plant completion, shakedown of equipment, process unit startup, shakedown of process units, variable run operation and a turnaround. During the construction period, technical personnel from DRC, MLGW and IGT will be at the plant site becoming familiar with the equipment, its installation and all of the auxiliaries so that on completion of construction they will be well grounded on the plant detail and its configuration. At the same time the supervisory operating personnel will have hands on training the gasifier operation at the IGT pilot plant to develop a field for gasifier operation. As a plant sections are completed, they will be checked out in accordance with the contractor and operator (client) procedure as outlined. Subsequent to this, various vendor designs and furnished equipment will be checked out operating-wise and a performance test run if feasible. The actual startup of the plant will be subsequential with the support areas as utilities, coal handling and waste treatment being placed in operation first. Subsequent to this the process units will be placed in operation starting from the rear of the process train and working forward. Thus the downstream units will be operating before the reactor is run on coal. The reactor will be checked out on coke operation.

  17. Optimal dimensioning of low-energy district heating networks with operational planning

    DEFF Research Database (Denmark)

    Tol, Hakan; Svendsen, Svend

    2012-01-01

    former study the performance of in-house heating systems was investigated for changing levels of supply temperature with consideration given both to current high-heat demand and future low-heat demand value of an existing settlement. The over-dimensions obtained at in-house heating systems originally...... in design stage resulted in satisfaction of heat demand of the house in low temperature operation. In this paper the operational planning of the low-energy DH systems was investigated to reduce the dimensions of the distribution network with consideration given both to current high-heat and future low......-heat demand situations. The operational planning was based on boosting (increasing) the supply temperature at peak-demand situations which occur rarely over a year period. Hence optimal pipe dimensions of low-energy DH systems were investigated based on the dynamic response of in-house heating systems...

  18. Science and Technology Operations Annual Evaluation of PNNL Environment, Health and Safety, and Facility Operations Performance for FY 1999

    Energy Technology Data Exchange (ETDEWEB)

    CHRISTENSEN, R.F.

    2000-01-24

    The framework required by P450 5 is clearly in place and includes regular interaction with DOE-RL. There is also a good balance between contractor DOE and other external oversight interactions. The integrated assessment program is fully capable of uncovering weaknesses in performance (e.g. compliance) This point is evidenced by the fact that the contractor has identified most if not all issues prior to that of external sources. However there are also areas for improvement. Self assessments need to be better connected to overall strategy. Varying levels of maturity across management systems exist regarding there ability to assess deployment. There is a need to improve the ability to prioritize and respond to identified opportunities for improvement. There is also a need to improve the integration of assessment results from multiple Self-Assessment plans as well as to improve the integration of the performance of assessments. Finally the partnership between DOE-RL and Battelle must continue to improve DOE RL s development of an appraisal plan early in the fiscal year working in close conjunction with the contractor can further strengthen the assessment program and help ensure that there is the right balance between contractor and external oversight activities and that such activities are focused toward appropriate issues.

  19. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Don

    2014-04-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will have passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy’s (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE’s Light Water Reactor Sustainability [LWRS] Program and EPRI’s Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to “establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.” This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.

  20. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.; Clancey, William J.; McDonald, Aaron; Toschlog, Jason; Tucker, Tyson; Khan, Ahmed; Madrid, Steven (Eric)

    2011-01-01

    In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

  1. Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    Energy Technology Data Exchange (ETDEWEB)

    Durling, R L; Price, D E; Spero, K K

    2005-06-06

    For over ten years, the Counterproliferation Analysis and Planning System (CAPS) at Lawrence Livermore National Laboratory (LLNL) has been a planning tool used by U.S. combatant commands for mission support planning against foreign programs engaged in the manufacture of weapons of mass destruction (WMD). CAPS is endorsed by the Secretary of Defense as the preferred counterproliferation tool to be used by the nation's armed services. A sister system, the Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging CAPS expertise designed to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented.

  2. Vulnerability And Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    Energy Technology Data Exchange (ETDEWEB)

    Durling, Jr., R L; Price, D E; Spero, K K

    2005-01-03

    For over ten years, the Counterproliferation Analysis and Planning System (CAPS) at Lawrence Livermore National Laboratory (LLNL) has been a planning tool used by U.S. combatant commands for mission support planning against foreign programs engaged in the manufacture of weapons of mass destruction (WMD). CAPS is endorsed by the Secretary of Defense as the preferred counterproliferation tool to be used by the nation's armed services. A sister system, the Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging CAPS expertise designed to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities is presented.

  3. Plan for the design, development, and implementation, and operation of the National Water Information System

    Science.gov (United States)

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  4. Optimal mechanical harvester route planning for sugarcane f ield operations using particle swarm optimization

    Directory of Open Access Journals (Sweden)

    Woraya Neungmatcha

    2015-06-01

    Full Text Available Since current agricultural production systems such as the sugarcane supply system in the sugar industry are developing towards larger and more complicated systems, there is consequently increasing use of agricultural machinery. Even though mechanization can help to increase the sugarcane yield, if the mechanical operation efficiency is low, then higher harvest costs and machinery shortages will occur. Global route planning for mechanical harvesters is one of the most important problems in the field of sugarcane harvesting and transporting operations. Improved efficiency and realistic implementation can be achieved by applying advanced planning methods for the execution of field operations, especially considering the field accessibility aspect. To address this issue, participative research was undertaken with a sugar milling company to produce and implement a mixed integer programming model that represents the mechanical harvester route plan. Particle swarm optimization was applied to find a solution to the model, leading to potential cost savings versus schedules produced manually by the mill officer. The model was also applied to explore regional planning options for a more integrated harvesting and transport system.

  5. Nagra annual report 2008

    Energy Technology Data Exchange (ETDEWEB)

    Ammann, M. (ed.)

    2009-07-01

    This annual report issued by the Swiss National Co-operative for the Disposal of Radioactive Waste, Nagra, reviews the co-operative's activities in the year 2008 and presents an overview of developments in energy policy, planning procedures and funding plans. Energy policy and the selection of sites for the disposal of radioactive wastes in Switzerland are discussed. Various technical questions are briefly addressed and work being carried out in the rock laboratories in the Swiss Alps and Jura mountains is discussed. International co-operation is reviewed and public relations issues are discussed. Finally, organisational structures are described and Nagra's financial details for the year 2008 are presented and discussed. The report is completed with an appendix containing the co-operative's organigram, waste inventories and listings of publications, addresses and a short glossary.

  6. Fiscal Year 1996 Annual Report and Five-Year (1996-2000) Strategic Investment Plan

    Science.gov (United States)

    1996-03-01

    metabolites (e.g. formate, acetate, propionate, as well as, benzoic, toluic, salicylic acids and isomers). This applied research project builds on the...distillation has been used in uranium operations at Y-12. Savannah River Site has recovered and reconcentrated nitric acid as part of their operation...Ethylbenzene, and Xylene Chromic Acid Anodizing Clean Air Act Amendments Clean Agile Manufacturing of Energetics California Air Resources Board

  7. Annual Report (1994) and Five-Year (1994-1998) Strategic Investment Plan.

    Science.gov (United States)

    1994-09-01

    Stripper for Powder and Electrodeposition Coatings (A) 190 Alternative Process to Acid Cleaning/Degreasing of Depleted Uranium 125 (A/DOE/AF) Cadmium...metabolites (e.g. formate, acetate, propionate ..... as well as, benzoic, toluic, salicylic acids and isomers). This applied research project builds on... uranium operations at Y-12. Savannah River Site has recovered and reconcentrated nitric acid as part of their operation. Pacific Northwest

  8. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program; Satellite Facilities Operation and Maintenance, 2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2006-01-01

    There were 2 acclimation periods at the Catherine Creek Acclimation Facility (CCAF) in 2005. During the early acclimation period, 130,748 smolts were delivered from Lookingglass Hatchery (LGH) on 7 March. This group contained progeny of both the captive (53%) and conventional broodstock programs. The size of the fish at delivery was 23.9 fish/lb. Volitional releases began 14 March 2005 and ended 27 March with an estimated total (based on PIT tag detections of 3,187) of 29,402 fish leaving the raceways. This was 22.5% of the total fish delivered. Fish remaining in the raceways after volitional release were forced out. Hourly detections of PIT-tagged fish showed that most of the fish left around 1900 hours. The size of the fish just before the volitional release was 23.9 and the size of the fish remaining just before the forced release was 23.2 fish/lb. The total mortality for the acclimation period was 204 (0.16%). The total number of fish released from the acclimation facility during the early period was 130,544. During the second acclimation period 59,100 smolts were delivered from LGH on 28 March. This group was comprised entirely of progeny from the conventional broodstock program. The size of the fish at delivery was 21.8 fish/lb. Volitional releases began 3 April 2005 and ended with a force out emergency release on 7 April. The size of the fish just before the volitional release was 21.8. The total mortality for the acclimation period was 64 (0.11 %). The total number of fish released from the acclimation facility during the late period was 59,036. There was only 1 planned acclimation period at the Upper Grande Ronde Acclimation Facility (UGRAF) in 2005. During the early acclimation period 105,418 smolts were delivered from LGH on 8 March. This group was comprised entirely of progeny from the conventional broodstock program. The size of the fish at delivery was 21.0 fish/lb. There was no volitional release in 2005 due to freezing air and water conditions

  9. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449&D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit.

  10. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  11. Using model based systems engineering for the development of the Large Synoptic Survey Telescope's operational plan

    Science.gov (United States)

    Selvy, Brian M.; Claver, Charles; Willman, Beth; Petravick, Don; Johnson, Margaret; Reil, Kevin; Marshall, Stuart; Thomas, Sandrine; Lotz, Paul; Schumacher, German; Lim, Kian-Tat; Jenness, Tim; Jacoby, Suzanne; Emmons, Ben; Axelrod, Tim

    2016-08-01

    We† provide an overview of the Model Based Systems Engineering (MBSE) language, tool, and methodology being used in our development of the Operational Plan for Large Synoptic Survey Telescope (LSST) operations. LSST's Systems Engineering (SE) team is using a model-based approach to operational plan development to: 1) capture the topdown stakeholders' needs and functional allocations defining the scope, required tasks, and personnel needed for operations, and 2) capture the bottom-up operations and maintenance activities required to conduct the LSST survey across its distributed operations sites for the full ten year survey duration. To accomplish these complimentary goals and ensure that they result in self-consistent results, we have developed a holistic approach using the Sparx Enterprise Architect modeling tool and Systems Modeling Language (SysML). This approach utilizes SysML Use Cases, Actors, associated relationships, and Activity Diagrams to document and refine all of the major operations and maintenance activities that will be required to successfully operate the observatory and meet stakeholder expectations. We have developed several customized extensions of the SysML language including the creation of a custom stereotyped Use Case element with unique tagged values, as well as unique association connectors and Actor stereotypes. We demonstrate this customized MBSE methodology enables us to define: 1) the rolls each human Actor must take on to successfully carry out the activities associated with the Use Cases; 2) the skills each Actor must possess; 3) the functional allocation of all required stakeholder activities and Use Cases to organizational entities tasked with carrying them out; and 4) the organization structure required to successfully execute the operational survey. Our approach allows for continual refinement utilizing the systems engineering spiral method to expose finer levels of detail as necessary. For example, the bottom-up, Use Case

  12. User-oriented data acquisition chain task planning algorithm for operationally responsive space satellite

    Institute of Scientific and Technical Information of China (English)

    Hao Chen; Jun Li; Ning Jing

    2016-01-01

    With the development of operational y responsive space (ORS) and on-board processing techniques, the end users can receive the observation data from the ORS satel ite directly. To satisfy the demand for reducing the requirements-tasking-effects cycle from one day to hours, the various resources of the whole data acquisition chain (including satel ites, ground stations, data processing centers, users, etc.) should be taken into an overal consideration, and the traditional batch task planning mode should be transformed into the user-oriented task planning mode. Con-sidering there are many approaches for data acquisition due to the new techniques of ORS satel ite, the data acquisition chain task planning problem for ORS satel ite can be seen as the multi-modal route planning problem. Thereby, a framework is presented using label-constrained shortest path technique with the conflict resolution. To apply this framework to solve the ORS satel ite task planning problem, the preprocessing and the conflict resolution strategies are discussed in detail. Based on the above work, the user-oriented data acquisition chain task planning algorithm for ORS satel ite is proposed. The exact solution can be obtained in polynomial time using the proposed algorithm. The simulation experiments validate the feasibility and the adaptability of the pro-posed approach.

  13. 49 CFR 244.15 - Subjects to be addressed in a Safety Integration Plan not involving an amalgamation of operations.

    Science.gov (United States)

    2010-10-01

    ... ACQUISITIONS OF CONTROL Safety Integration Plans § 244.15 Subjects to be addressed in a Safety Integration Plan... 49 Transportation 4 2010-10-01 2010-10-01 false Subjects to be addressed in a Safety Integration Plan not involving an amalgamation of operations. 244.15 Section 244.15 Transportation...

  14. Forest operations planning by using RTK-GPS based digital elevation model

    Directory of Open Access Journals (Sweden)

    Neşe Gülci

    2015-07-01

    Full Text Available Having large proportion of forests in mountainous terrain in Turkey, the logging methods that not only minimize operational costs but also minimize environmental damages should be determined in forest operations planning. In a case where necessary logging equipment and machines are available, ground slope is the most important factor in determining the logging method. For this reason, accurate, up to date, and precise ground slope data is very crucial in the success of forest operations planning. In recent years, high-resolution Digital Elevation Models (DEM can be generated for forested areas by using Real Time Kinematic (RTK GPS method and these DEMs can be used to develop precise slope maps. In this study, high-resolution DEM was developed by RTK-GPS method to generate precise slope map in a sample area. Then, the slope map was classified into slope classes specified by IUFRO in order to assist forest operations planning. According to the results, logging methods that are suitable for very steep and steep terrain conditions (i.e. skyline logging, cable pulling, and chute systems should be preferred in 48.1% of the study area. It was also found that logging methods that are suitable for terrain with medium slope (i.e. skidding and cable pulling and gentle slope (i.e. skidding and mobile winch should be preferred in 34.1% and 17.8% of the study area, respectively.

  15. Annual Treatment Operation Report of Radioactive Liquid Waste in Temporary Storage in 2015

    Institute of Scientific and Technical Information of China (English)

    LI; Wei; DU; Guang-fei; WANG; Jian-xin; SHAO; Yan-jiang; DU; Hong-ming

    2015-01-01

    This project was officially approved in 2011.2015was the 4th running year that to treat the radioactive liquid waste in the temporary storage.According to the project plan,all work had been completed.The financial accounts and audit had been finished.The main task included the cement

  16. Reliability-Based Planning of Inspection, Operation and Maintenance for Offshore Oil & Gas Structures and Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2011-01-01

    Reliability-based cost-optimal planning of inspection, maintenance and operation has many applications. In this paper applications for planning of inspections for oil & gas jacket structures and of operation and maintenance of offshore wind turbines are described and illustrated by examples....

  17. Measurement of Lake Roosevelt Biota in Relation to Reservoir Operations; 1991 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Janelle R.; McDowell, Amy C.; Scholz, Allan T.

    1995-08-01

    The purpose of this study was to collect biological data from Lake Roosevelt to be used in the design of a computer model that would predict biological responses to reservoir operations as part of the System Operation Review program. Major components of the Lake Roosevelt model included: quantification of impacts to phytoplankton, zooplanktons, benthic invertebrates, and fish caused by reservoir drawdowns and low water retention times; quantification of number, distribution, and use of fish food organisms in the reservoir by season; determination of seasonal growth of fish species as related to reservoir operations, prey abundance and utilization; and quantification of entrainment levels of zooplankton and fish as related to reservoir operations and water retention times. This report summarized the data collected on Lake Roosevelt for 1991 and includes limnological, zooplankton, benthic macroinvertebrate, fishery, and reservoir operation data. Discussions cover reservoir operation affect upon zooplankton, benthic macroinvertebrates, and fish. Reservoir operations brought reservoir elevations to a low of 1,221.7 in April, the result of power operations and a flood control shift from Dworshak Dam, in Idaho, to Grand Coulee Dam. Water retention times were correspondingly low reaching a minimum of 14.7 days on April 27th.

  18. Operational planning using Climatological Observations for Maritime Prediction and Analysis Support Service (COMPASS)

    Science.gov (United States)

    O'Connor, Alison; Kirtman, Benjamin; Harrison, Scott; Gorman, Joe

    2016-05-01

    The US Navy faces several limitations when planning operations in regard to forecasting environmental conditions. Currently, mission analysis and planning tools rely heavily on short-term (less than a week) forecasts or long-term statistical climate products. However, newly available data in the form of weather forecast ensembles provides dynamical and statistical extended-range predictions that can produce more accurate predictions if ensemble members can be combined correctly. Charles River Analytics is designing the Climatological Observations for Maritime Prediction and Analysis Support Service (COMPASS), which performs data fusion over extended-range multi-model ensembles, such as the North American Multi-Model Ensemble (NMME), to produce a unified forecast for several weeks to several seasons in the future. We evaluated thirty years of forecasts using machine learning to select predictions for an all-encompassing and superior forecast that can be used to inform the Navy's decision planning process.

  19. Optimal Planning and Operation Management of a Ship Electrical Power System with Energy Storage System

    DEFF Research Database (Denmark)

    Anvari-Moghaddam, Amjad; Dragicevic, Tomislav; Meng, Lexuan

    2016-01-01

    for the proposed plan is derived based on the solution from a mixed-integer nonlinear programming (MINLP) problem. Simulation results showed that including well-sized energy storage options together with optimal operation management of generating units can improve the economic operation of the test system while...... problems to shipboard systems where some means of generation and storage are also schedulable. First, the question of whether or how much energy storage to include into the system is addressed. Both the storage power rating in MW and the capacity in MWh are optimized. Then, optimal operating strategy......Next generation power management at all scales is highly relying on the efficient scheduling and operation of different energy sources to maximize efficiency and utility. The ability to schedule and modulate the energy storage options within energy systems can also lead to more efficient use...

  20. Applying 3D-printing technology in planning operations of cancer patients

    Science.gov (United States)

    Kashapov, L. N.; N, A. N. Rudyk A.; Kashapov, R. N.

    2014-12-01

    The purpose of this work was creation 3D model of the front part of the skull of the patient and evaluates the effectiveness of its use in the planning of the operation. To achieve this goal was chosen an operation to remove a tumor of the right eyelid, germinate in the zygomatic bone. 3D printing was performed at different peripheral devices using the method of layering creating physical objects by a digital 3D model as well as the recovery model of the skull with the entire right malar bone for fixation on her titanium frame to maintain the eyeball in a fixed state.

  1. Planning Considerations for a Future Operational Campaign in NATO’s Central Region

    Science.gov (United States)

    1992-01-31

    scale military operations. At the same time, many of these alternatives are not covered by extant military plans and NATO planners will face a tabula ... rasa from which to draw guidance. Moreover, many of these options fall outside traditional military missions or do not lend themselves strictly to the...systems and information, logistics capabilities, or transportation assets. On the other hand, if the United States desires a more positive role in the

  2. Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    JANIN, L.F.

    2000-08-30

    This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

  3. Congenital hip disease in adults: terminology, classification, pre-operative planning and management.

    Science.gov (United States)

    Karachalios, T; Hartofilakidis, G

    2010-07-01

    This paper reviews the current knowledge relating to the management of adult patients with congenital hip disease. Orthopaedic surgeons who treat these patients with a total hip replacement should be familiar with the arguments concerning its terminology, be able to recognise the different anatomical abnormalities and to undertake thorough pre-operative planning in order to replace the hip using an appropriate surgical technique and the correct implants and be able to anticipate the clinical outcome and the complications.

  4. The 24th Annual Precise Time and Time Interval (PTTI) Applications and Planning Meeting

    Science.gov (United States)

    Sydnor, Richard L.

    1993-01-01

    A compilation of technical papers presented at the 24th Precise Time and Time Interval (PTTI) Applications and Planning Meeting held in Dec. 1992 is presented. Papers are in the following categories: recent developments in rubidium, cesium, and hydrogen-based frequency standards, and in cryogenic and trapped-ion technology; international and transnational applications of PTTI technology with emphasis on satellite laser tracking networks, GLONASS timing, intercomparison of national time scales, and international telecommunications; applications of PTTI technology to the telecommunications, power distribution, and platform positioning, and geophysical survey industries; applications of PTTI technology to evolving military communications and navigation systems; and dissemination of precise time and frequency by means of GPS, GLONASS, MILSTAR, Loran, and synchronous communications satellites.

  5. Bioconversion of plant biomass to ethanol. Annual report and revised research plan, January 1977--January 1978

    Energy Technology Data Exchange (ETDEWEB)

    Brooks, R.E.; Bellamy, W.D.; Su, T.M.

    1978-03-23

    The objective of this research is to demonstrate on a laboratory scale the technical feasibility of the direct microbial conversion of pretreated wood to ethanol. During the first year of this contract, we investigated the feasibility of biologically delignifying wood with C. pruinosum and directly fermenting the pretreated wood to ethanol with a mixed culture. Bench-top fermentations of a thermophilic bacillus growing on glucose and of a mixed culture of thermophilic sporocytophaga (US) and a thermophilic bacillus growing on microcrystalline and amorphous cellulose were evaluated for growth and ethanol production. In the mixed culture fermentation of amorphous and microcrystalline cellulose, the specific rate of substrate depletion was calculated to be 0.087 hr/sup -1/ and 0.0346 hr/sup -1/, respectively. However, defining the growth requirements of C. pruinosum and sporocytophaga (US) proved more difficult than originally anticipated. In order to achieve the program objectives within the contract period, a revised research plan was developed based upon chemical pretreatment and the direct fermentation of pretreated hardwood to ethanol. In place of the biological delignification pretreatment step, we have substituted a chemically supplemented steam pretreatment step to partially delignify wood and to enhance its accessibility to microbial utilization. Clostridium thermocellum, which ferments cellulose directly to ethanol and acetic acid, has replaced the mixed culture fermentation stage for ethanol production. Research on the production of ethanol from xylose by the thermophilic bacillus ZB-B2 is retained as one means of utilizing the hemicellulose fraction of hardwood. Work on the genetic improvement of the ethanol yields of both cultures by suppressing acetic acid production is also retained. The rationale, experimental approach, and economic considerations of this revised research plan are also presented.

  6. Using Micro-Synchrophasor Data for Advanced Distribution Grid Planning and Operations Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, Emma [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kiliccote, Sila [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); McParland, Charles [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Roberts, Ciaran [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-07-01

    This report reviews the potential for distribution-grid phase-angle data that will be available from new micro-synchrophasors (µPMUs) to be utilized in existing distribution-grid planning and operations analysis. This data could augment the current diagnostic capabilities of grid analysis software, used in both planning and operations for applications such as fault location, and provide data for more accurate modeling of the distribution system. µPMUs are new distribution-grid sensors that will advance measurement and diagnostic capabilities and provide improved visibility of the distribution grid, enabling analysis of the grid’s increasingly complex loads that include features such as large volumes of distributed generation. Large volumes of DG leads to concerns on continued reliable operation of the grid, due to changing power flow characteristics and active generation, with its own protection and control capabilities. Using µPMU data on change in voltage phase angle between two points in conjunction with new and existing distribution-grid planning and operational tools is expected to enable model validation, state estimation, fault location, and renewable resource/load characterization. Our findings include: data measurement is outstripping the processing capabilities of planning and operational tools; not every tool can visualize a voltage phase-angle measurement to the degree of accuracy measured by advanced sensors, and the degree of accuracy in measurement required for the distribution grid is not defined; solving methods cannot handle the high volumes of data generated by modern sensors, so new models and solving methods (such as graph trace analysis) are needed; standardization of sensor-data communications platforms in planning and applications tools would allow integration of different vendors’ sensors and advanced measurement devices. In addition, data from advanced sources such as µPMUs could be used to validate models to improve

  7. Role of Surgical Services in Profitability of Hospitals in California: An Analysis of Office of Statewide Health Planning and Development Annual Financial Data.

    Science.gov (United States)

    Moazzez, Ashkan; de Virgilio, Christian

    2016-10-01

    With constant changes in health-care laws and payment methods, profitability, and financial sustainability of hospitals are of utmost importance. The purpose of this study is to determine the relationship between surgical services and hospital profitability. The Office of Statewide Health Planning and Development annual financial databases for the years 2009 to 2011 were used for this study. The hospitals' characteristics and income statement elements were extracted for statistical analysis using bivariate and multivariate linear regression. A total of 989 financial records of 339 hospitals were included. On bivariate analysis, the number of inpatient and ambulatory operating rooms (ORs), the number of cases done both as inpatient and outpatient in each OR, and the average minutes used in inpatient ORs were significantly related with the net income of the hospital. On multivariate regression analysis, when controlling for hospitals' payer mix and the study year, only the number of inpatient cases done in the inpatient ORs (β = 832, P = 0.037), and the number of ambulatory ORs (β = 1,485, 466, P = 0.001) were significantly related with the net income of the hospital. These findings suggest that hospitals can maximize their profitability by diverting and allocating outpatient surgeries to ambulatory ORs, to allow for more inpatient surgeries.

  8. DIII-D research operations. Annual report, October 1, 1991--September 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Baker, D. [ed.

    1993-05-01

    This report discusses the research on the following topics: DIII-D program overview; divertor and boundary research program; advanced tokamak studies; tokamak physics; operations; program development; support services; contribution to ITER physics R&D; and collaborative efforts.

  9. 1995 Annual Report and Five Year (1995-1999) Strategic Investment Plan

    Science.gov (United States)

    1996-08-01

    benzoic, toluic, salicylic acids and isomers). This applied research project builds on the basic work begun with USEPA-RSKERL support (Barcelona...recycle by evaporation and distillation has been used in uranium operations at Y-12. Savannah River Site has recovered and reconcentrated nitric acid as...DFSS DMMF DNA Benzene Bureau of Land Management Benzene, Toluene, Ethylbenzene, and Xylene Chromic Acid Anodizing Clean Air Act Amendments

  10. The 14th Annual Conference on Manual Control. [digital simulation of human operator dynamics

    Science.gov (United States)

    1978-01-01

    Human operator dynamics during actual manual control or while monitoring the automatic control systems involved in air-to-air tracking, automobile driving, the operator of undersea vehicles, and remote handling are examined. Optimal control models and the use of mathematical theory in representing man behavior in complex man machine system tasks are discussed with emphasis on eye/head tracking and scanning; perception and attention allocation; decision making; and motion simulation and effects.

  11. Visual analysis of uncertainties in ocean forecasts for planning and operation of off-shore structures

    KAUST Repository

    Hollt, Thomas

    2013-02-01

    We present a novel integrated visualization system that enables interactive visual analysis of ensemble simulations used in ocean forecasting, i.e, simulations of sea surface elevation. Our system enables the interactive planning of both the placement and operation of off-shore structures. We illustrate this using a real-world simulation of the Gulf of Mexico. Off-shore structures, such as those used for oil exploration, are vulnerable to hazards caused by strong loop currents. The oil and gas industry therefore relies on accurate ocean forecasting systems for planning their operations. Nowadays, these forecasts are based on multiple spatio-temporal simulations resulting in multidimensional, multivariate and multivalued data, so-called ensemble data. Changes in sea surface elevation are a good indicator for the movement of loop current eddies, and our visualization approach enables their interactive exploration and analysis. We enable analysis of the spatial domain, for planning the placement of structures, as well as detailed exploration of the temporal evolution at any chosen position, for the prediction of critical ocean states that require the shutdown of rig operations. © 2013 IEEE.

  12. Comparative analysis of operational forecasts versus actual weather conditions in airline flight planning, volume 2

    Science.gov (United States)

    Keitz, J. F.

    1982-01-01

    The impact of more timely and accurate weather data on airline flight planning with the emphasis on fuel savings is studied. This volume of the report discusses the results of Task 2 of the four major tasks included in the study. Task 2 compares various catagories of flight plans and flight tracking data produced by a simulation system developed for the Federal Aviation Administrations by SRI International. (Flight tracking data simulate actual flight tracks of all aircraft operating at a given time and provide for rerouting of flights as necessary to resolve traffic conflicts.) The comparisons of flight plans on the forecast to flight plans on the verifying analysis confirm Task 1 findings that wind speeds are generally underestimated. Comparisons involving flight tracking data indicate that actual fuel burn is always higher than planned, in either direction, and even when the same weather data set is used. Since the flight tracking model output results in more diversions than is known to be the case, it was concluded that there is an error in the flight tracking algorithm.

  13. Sampling and analysis plan for the site characterization of the waste area Grouping 1 groundwater operable unit at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-11-01

    Waste Area Grouping (WAG) 1 at Oak Ridge National Laboratory (ORNL) includes all of the former ORNL radioisotope research, production, and maintenance facilities; former waste management areas; and some former administrative buildings. Site operations have contaminated groundwater, principally with radiological contamination. An extensive network of underground pipelines and utilities have contributed to the dispersal of contaminants to a known extent. In addition, karst geology, numerous spills, and pipeline leaks, together with the long and varied history of activities at specific facilities at ORNL, complicate contaminant migration-pathway analysis and source identification. To evaluate the extent of contamination, site characterization activity will include semiannual and annual groundwater sampling, as well as monthly water level measurements (both manual and continuous) at WAG 1. This sampling and analysis plan provides the methods and procedures to conduct site characterization for the Phase 1 Remedial Investigation of the WAG 1 Groundwater Operable Unit.

  14. Sandia Strategic Plan 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    Sandia embarked on its first exercise in corporate strategic planning during the winter of 1989. The results of that effort were disseminated with the publication of Strategic Plan 1990. Four years later Sandia conducted their second major planning effort and published Strategic Plan 1994. Sandia`s 1994 planning effort linked very clearly to the Department of Energy`s first strategic plan, Fueling a Competitive Economy. It benefited as well from the leadership of Lockheed Martin Corporation, the management and operating contractor. Lockheed Martin`s corporate success is founded on visionary strategic planning and annual operational planning driven by customer requirements and technology opportunities. In 1996 Sandia conducted another major planning effort that resulted in the development of eight long-term Strategic Objectives. Strategic Plan 1997 differs from its predecessors in that the robust elements of previous efforts have been integrated into one comprehensive body. The changes implemented so far have helped establish a living strategic plan with a stronger business focus and with clear deployment throughout Sandia. The concept of a personal line of sight for all employees to this strategic plan and its objectives, goals, and annual milestones is becoming a reality.

  15. Measurement of Lake Roosevelt Biota in Relation to Reservoir Operations; 1992 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, Janelle R.; McDowell, Amy C.

    1996-01-01

    The purpose of this research project is to collect data to model resident fish requirements for Lake Roosevelt as part of the Bonneville Power Administration (BPA), Bureau of Reclamation (BoR), and U.S. Army Corps of Engineer`s (ACE) System Operation Review. The System Operation Review (SOR) is a tri-agency team functioning to review the use and partitioning of Columbia Basin waters. User groups of the Columbia have been defined as power, irrigation, flood control, anadromous fish, resident fish, wildlife, recreation, water quality, navigation, and cultural resources. Once completed the model will predict biological responses to different reservoir operation strategies. The model being developed for resident fish is based on Montana Department of Fish, Wildlife, and Parks model for resident fish requirements within Hungry Horse and Libby Reservoirs. While the Montana model predicts fish growth based on the impacts of reservoir operation and flow conditions on primary and secondary production levels, the Lake Roosevelt model will also factor in the affects of water retention time on zooplankton production levels and fish entrainment. Major components of the Lake Roosevelt model include: (1) quantification of impacts to zooplankton, benthic invertebrates, and fish caused by reservoir drawdowns and low water retention times; (2) quantification of number, distribution, and use of fish food organisms in the reservoir by season; (3) determination of seasonal growth of fish species as related to reservoir operations, prey abundance and utilization; and (4) quantification of entrainment levels of fish as related to reservoir operations and water retention times. This report contains the results of the resident fish system operation review program for Lake Roosevelt from January through December 1992.

  16. Nagra annual report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Ammann, M. (ed.)

    2008-07-01

    This annual report issued by the Swiss National Cooperative for the Disposal of Radioactive Waste reviews the co-operative's activities in the year 2007 and presents an overview of developments in energy policy, planning procedures and funding plans. The selection of sites for the disposal of radioactive wastes in Switzerland is discussed. Various technical questions are briefly addressed and work being carried out in the rock laboratories in the Swiss Alps and Jura mountains is discussed. International co-operation is reviewed and public relations issues are discussed. Finally, organisational structures are described and the financial details for the year 2007 are presented. The report is completed with an appendix containing the co-operative's organigram, waste inventories and listings of publications, addresses and a short glossary.

  17. Approach to Issues in Planning and Operation of Railway BOT Projects

    Institute of Scientific and Technical Information of China (English)

    Zhao Xianghong; Chen Min

    2009-01-01

    As an internationally popular mode of public infrastructures' investment,construction and operation,BOT (build-operate-transfer) has been successfully applied in some countries and regions of the world for their infrastructures' construction and playing an important role in promoting the construction of public infrastructures.The Ministry of Railways clearly proposed in its Suggestions for Implementation of Encouraging,Supporting and Guiding Participation of Non-public-owned Economy in Railway Construction and Operation that it was necessary to study and take for reference multiple modes of public infrastructures'investment,construction and operation including BOT.It is more complicated and risky for the process of planning and operation of BOT projects.The paper takes for reference the domestic and foreign experiences in the operation of BOT projects,analyzes the issues that will arise such as risk control in implementing railway BOT projects,employment of professional consultants,financing coordination,tariff making,non-commercial subsidy,as well as operation and management,and puts forward corresponding suggestions for these issues.

  18. Impact of climate change on operations and planning of Hydro-Quebec's generation system

    Energy Technology Data Exchange (ETDEWEB)

    Raymond, M.P.; Houle, B.; Robert, S. [Hydro-Quebec, Montreal, PQ (Canada)

    2008-07-01

    Hydraulic resources currently account for more than 95 per cent of Hydro-Quebec's generation capacity. Hydro-Quebec also plans to purchase more wind power in the future. However, the utility wind and hydroelectric resources will be affected by climatic change in the future. This paper outlined research needed by hydroelectric and water resource managers in order to accurately determine the impacts of climatic change. Parameters included changes in annual and seasonal distribution as well as changes in the variability of natural inflows. The research will be used to determine the configuration of new projects as well as the refurbishment and replacement of existing infrastructure. Load profiles for the future indicate that electricity use will change, with less heating needed in winter, and more air conditioning required in summer months. The Delta method was used to determine impacts of future inflows and hydrological regimes. A case study of climate change impacts and management strategies for the Outardes River system up to the year 2050 was presented. The study showed that higher inflows are expected to produce more energy. Maintenance planning and flood control techniques were also discussed. The study showed that the effects of climate change on each of Hydro-Quebec's systems is expected to follow a similar pattern to the Outardes system. tabs., figs.

  19. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  20. Constructing Hongqiao Hub and Serving Regional Economy:Planning and Operation of Hongqiao Comprehensive Transportation Hub

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Taking Hongqiao Integrated Transportation Hub Project as a case, this paper introduces its origin, orientation, development programming, planning and design, road planning, information system planning, air-rail integrated transportation planning, disaster prevention planning, and so on.

  1. CT pre-operative planning of a new semi-implantable bone conduction hearing device

    Energy Technology Data Exchange (ETDEWEB)

    Law, Eric K.C.; Bhatia, Kunwar S.S. [Prince of Wales Hospital, The Chinese University of Hong Kong, Department of Imaging and Interventional Radiology, Hong Kong, SAR (China); Tsang, Willis S.S.; Tong, Michael C.F. [Prince of Wales Hospital, The Chinese University of Hong Kong, Department of Otorhinolaryngology, Head and Neck Surgery, Hong Kong, SAR (China); Shi, Lin [The Chinese University of Hong Kong, Department of Medicine and Therapeutics, Hong Kong, SAR (China); The Chinese University of Hong Kong, Chow Yuk Ho Technology Center for Innovative Medicine, Hong Kong, SAR (China)

    2016-06-15

    Accommodating a novel semi-implantable bone conduction hearing device within the temporal bone presents challenges for surgical planning. This study describes the utility of CT in pre-operative assessment of such an implant. Retrospective review of pre-operative CT, clinical and surgical records of 16 adults considered for device implantation. Radiological suitability was assessed on CT using 3D simulation software. Antero-posterior (AP) dimensions of the mastoid bone and minimum skull thickness were measured. CT planning results were correlated with operative records. Eight and five candidates were suitable for device placement in the transmastoid and retrosigmoid positions, respectively, and three were radiologically unsuitable. The mean AP diameter of the mastoid cavity was 14.6 mm for the transmastoid group and 4.6 mm for the retrosigmoid group (p < 0.05). Contracted mastoid and/or prior surgery were predisposing factors for unsuitability. Four transmastoid and five retrosigmoid positions required sigmoid sinus/dural depression and/or use of lifts due to insufficient bone capacity. A high proportion of patients being considered have contracted or operated mastoids, which reduces the feasibility of the transmastoid approach. This finding combined with the complex temporal bone geometry illustrates the importance of careful CT evaluation using 3D software for precise device simulation. (orig.)

  2. National Ignition Facility start-up/operations engineering and special equipment construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Huddleston, P C

    1998-05-08

    This document sets forth the responsibilities, interfaces, guidelines, rules, policy, and regulations for all workers involved in the S/O and SE construction, installation, and acceptance testing. This document is enforced from the first day that S/O and SE workers set foot on the NIF construction site until the end of the Project at Critical Decision 4. This document is applicable only to site activities, which are defined as those that occur within the perimeter of the fenced-off NIF construction zone and the Target Chamber Assembly Area (Helipad). The associated Special Equipment laydown and construction support areas listed in Appendix B are not under this plan; their safety provisions are discussed in the Appendix. Prototype and other support activities, such as the Amplifier Laboratory and Frame Assembly Unit assembly area, are not included in this plan. After completion of the Operational Readiness Review, the Facility Safety Procedure, Operational Safety Requirements, and Operational Safety Procedures are the governing safety documents for the operating facility. The S/O and SE project elements are required to implement measures that create a universal awareness of and promote safe job practices at the site. This includes all Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory, Sandia National Laboratories, University of Rochester, supplement labor organization, and subcontractor employees; visitors; and guests serving the S/O and SE effort.

  3. Operation of the solvent-refined-coal pilot plant, Wilsonville, Alabama. Annual technical report, January-December 1980

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, H.E.

    1981-08-01

    The plant was in operation for the equivalent of 247 days, an on-stream factor of 67.7%. Kentucky 9 coals from the Lafayette, Dotiki and Fies mines were processed. During 1980, the operating conditions and equipment were adjusted to evaluate potential process improvements. These experiments produced significant results in the following areas: Operating V103 High Pressure Separator in the hot mode; varying T102 Vacuum Column operating temperature; adding light SRC (LSRC), a product of the third stage of the Critical Solvent Deashing (CSD) unit, to the process solvent; investigating the effects of the chlorine content of the feed coal on corrosion in the process vessels; evaluating the effects of adding sodium carbonate on corrosion rates; operating under conditions of low severity; i.e., low reactor temperature and long residence time; and testing an alternate CSD deashing solvent. A series of simulation runs investigating the design operating conditions for a planned 6000 ton per day SRC-I demonstation plant were also completed. Numerous improvements were made in the CSD processing area, and the components for a hydrotreating unit were installed.

  4. Seasonal variation in female mate choice and operational sex ratio in wild populations of an annual fish, Austrolebias reicherti.

    Science.gov (United States)

    Passos, Carlos; Tassino, Bettina; Reyes, Federico; Rosenthal, Gil G

    2014-01-01

    The intensity of mating competition and the potential benefits for female of mating with certain males can be influenced by several extrinsic factors, such that behavioral decisions can be highly context-dependent. Short-lived species with a single reproductive season are a unique model to study context-sensitive mating decisions. Through exhaustive sampling in the field and simultaneous choice tests in the laboratory, we evaluated operational sex ratio (OSR) and female mate choice at the beginning and end of the reproductive season in the annual killifish Austrolebias reicherti. We found seasonal change in both OSR and female mate choice. At the start of the reproductive season the OSR did not deviate from parity, and females preferred larger males. Later in the reproductive season, while the proportion of males in the ponds decreased, females became unselective with respect to male size. The particular biological cycle of annual killifish, where both life expectancy and mating opportunities decline sharply over a short timescale, could account for the seasonal change in female choice. Reduction in choosiness could arise from diminished reproductive prospects due to a decline in male availability. Moreover, as the end of the season approaches, any benefits of choosiness are presumably reduced: a female's fitness will be higher if she mates with any male than if she forgoes reproduction and dies. Future work will disentangle the mechanisms underlying seasonal changes in mating preferences, notably direct responses to demographic factors, environmental cues, or intrinsic changes during development.

  5. Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

    Science.gov (United States)

    Equils, Douglas J.

    2008-01-01

    Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of

  6. Tier One Performance Screen Initial Operational Test and Evaluation: 2012 Annual Report

    Science.gov (United States)

    2014-05-01

    Adaptive Personality Assessment System (TAPAS), for an initial operational test and evaluation ( IOT &E), beginning administration to applicants in 2009...selection and classification purposes. The Information / Communications Technology Literacy Test (ICTL) has also been incorporated into the IOT &E. The...classification SECURITY CLASSIFICATION OF 19. LIMITATION OF ABSTRACT Unclassified Unlimited 20. NUMBER OF PAGES 110 21. RESPONSIBLE

  7. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  8. FY 2013 INL SITE SUSTAINABILITY PLAN WITH THE FY 2012 ANNUAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Ernest L. Fossum; Steve A. Birrer

    2012-12-01

    It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

  9. FY 2012 INL SITE SUSTAINABILITY PLAN WITH THE FY 2011 ANNUAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Ernest L. Fossum; Steve A. Birrer

    2012-01-01

    It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy, Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

  10. INL FY 2011 SITE SUSTAINABILITY PLAN WITH THE FY 2010 ANNUAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Ernest L. Fossum; Steve A. Birrer

    2010-12-01

    It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 'Strengthening Federal Environmental, Energy, and Transportation Management,' the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B 'Departmental Energy, Renewable energy, and Transportation Management' and were also identified in DOE Order 450.1A, 'Environmental Protection Program.' These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).

  11. Preparedness strategy and procedures. Annual report 1996. Plans for 1997; Beredskabsstrategi og -procedure. Aarsrapport 1996. Planer for 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    EKO-3 Preparedness Strategy and Procedures, a title that covers the subjects - collection, quality assurance, and the use of data in a preparedness situation. The term data is used here in its widest sense covering measurements, samples, radioecological background information, etc. The following sub-projects are part of EKO-3: EKO-3.1 Mobile measurements; EKO-3.2 Quality Assurance in sampling and analysis; EKO-3.3 Operational intervention levels; EKO-3.4 Measurement strategy, basis for decisions, and interventions in agriculture. EKO-3.1 which was the first started project is more or less completed. The sub-project will, however, continue with reference to a common NKS-EU follow-up exercise on RESUME-95 in 1998 - RESUME-98. In 1996 most funds has been given to EKO-3.2. The different parts of the project have been launched and the first of them are approaching their conclusion, this is the case for for example Quality assurance in gamma spectroscopy with accreditation as a goal. For 1997 a number of `typical` Nordic scenarios is planned. EKO-3.4 too has proceeded as planned in 1996. Also in this project the work has partly been on planning. The project work proceeds well and a draft version of the final report is expected ultimo 1996. (EG).

  12. A test case of computer aided motion planning for nuclear maintenance operation

    Energy Technology Data Exchange (ETDEWEB)

    Schmitzberger, E.; Bouchet, J.L. [Electricite de France (EDF), Dept. Surveillance Diagnostic Maintenance, 78 - Chatou (France); Schmitzberger, E. [Institut National Polytechnique, CRAN, 54 - Vandoeuvre les Nancy (France)

    2001-07-01

    Needs for improved tools for nuclear power plant maintenance preparation are expressed by EDF engineering. These are an easier and better management of logistics constraints such as free spaces for motions or handling tasks. The lack of generic or well suited tools and the specificity of nuclear maintenance operation have led EDF R and D to develop its own motion planning tools in collaboration with LAAS-CNRS, Utrecht University and the software publisher CADCENTRE within the framework of the three years Esprit LTR project MOLOG. EDF users needs will be summed up in the first part of the paper under the title ''Motion feasibility studies for maintenance operation'' and then compared to the current industrial offer in the ''Software's background'''s part. The definition and objectives ''Towards motion planning tools'' follows. It explains why maintenance preparation pertains to automatic motion planning and how it makes studies much simpler. The ''MOLOG's Benchmark and first result'''s part describes the test-case used to evaluate the MOLOG project and gives an outlook at the results obtained so far. (author)

  13. Office for Analysis and Evaluation of Operational Data 1992 annual report: Power reactors. Volume 7, No. 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1993-07-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance, measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from such sources as licensee event report% diagnostic evaluations, and reports to the NRC`s Operations Center. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Each volume contains a list of the AEOD reports issued for 1984--1992.

  14. Office for Analysis and Evaluation of Operational Data 1994-FY 95 annual report. Volume 9, Number 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during CY 1994 and FY 1995. The report is published in three parts. NUREG-1272, Vol. 9, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 9, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from 1980 through FY 1995. NUREG-1272, Vol. 9, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission.

  15. Yearly power system planning program (YPSPP)

    Energy Technology Data Exchange (ETDEWEB)

    Zeljko, M. [Energy Institute `Hrvoje Pozar`, Zagreb, (Croatia)

    1997-12-31

    Development of a computer program designed for planning the annual operation of an electric power generating system is described. The program is planned in four modules, i.e. load forecasting, hydro scheduling, maintenance scheduling, and production costing. Individual modules communicate by way of a common database designed in ORACLE. The program has been in use during the past two years for the centralized planning of the annual operation of the Croatian electric power system. Further improvements planned include addition of a man-machine interface, and graphic presentation of input data. 2 refs., 2 figs.

  16. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  17. 100-OL-1 Operable Unit Field Portable X-Ray Fluorescence (XRF) Analyzer Pilot Study Plans

    Energy Technology Data Exchange (ETDEWEB)

    Bunn, Amoret L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fritz, Brad G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wellman, Dawn M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-07-01

    A pilot study is being conducted to support the approval of the Remedial Investigation/Feasibility Study (RI/FS) Work Plan to evaluate the 100-OL-1 Operable Unit (OU) pre-Hanford orchard lands. Based on comments received by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology, the pilot study will evaluate the use of field portable X-ray fluorescence (XRF) spectrometry measurements for evaluating lead and arsenic concentrations on the soil surface as an indicator of past use of lead arsenate pesticide residue in the OU. The work will be performed in the field during the summer of 2014, and assist in the planning for the characterization activities in the RI/FS.

  18. 100-OL-1 Operable Unit Field Portable X-Ray Fluorescence (XRF) Analyzer Pilot Study Plans

    Energy Technology Data Exchange (ETDEWEB)

    Bunn, Amoret L.; Fritz, Brad G.; Wellman, Dawn M.

    2014-07-15

    A pilot study is being conducted to support the approval of the Remedial Investigation/Feasibility Study (RI/FS) Work Plan to evaluate the 100-OL-1 Operable Unit (OU) pre-Hanford orchard lands. Based on comments received by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology, the pilot study will evaluate the use of field portable X-ray fluorescence (XRF) spectrometry measurements for evaluating lead and arsenic concentrations on the soil surface as an indicator of past use of lead arsenate pesticide residue in the OU. The work will be performed in the field during the summer of 2014, and assist in the planning for the characterization activities in the RI/FS.

  19. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.

  20. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Sellman, Jake; Dykstra, Tim [Shoshone-Paiute Tribes

    2009-05-11

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality

  1. Planned Operation of Tritium Recovery System Based on Investigation of LHD Exhaust System

    Science.gov (United States)

    Asakura, Yamato; Suzuki, Naoyuki

    To understand the conditions of exhaust gas treatment at the transition point between the Large Helical Device (LHD) vacuum pumping system and the exhaust gas tritium recovery system, the gas flow rate and hydrogen concentration were measured. Simultaneous measurement of the exhaust gas flow rate and hydrogen concentration was made possible by applying two types of hydrogen monitors: a thermal conductivity sensor and a combustible gas sensor. The obtained results have led to remodeling of the LHD vacuum pumping system and an optimised plan of operation for the tritium recovery system.

  2. Discussion of Planning and Operating of Chongming Qianwei Village's Nongjiale tourism site

    Science.gov (United States)

    Guo, Qingqing; Liu, Min

    According to the sufficient market research the paper put forward the Construction and operation of Chongming Qianwei village Nongjiale tour website completed the Building program of this Business Website. Through needs analysis and feasibility analysis, this paper proposed business model for the target system, transaction mode, revenue model and competitive edge. Opening of the bridge which contact Shanghai and Chongming, coming of the shanghai expo; will bring the growth of passenger traffic of chongming's tourism industry. This article is based on this background, discussing the exploitation and plan of tour website of ChongMing, Enhancing the Popularity and Competitiveness of Chongming's Tourism.

  3. INL SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS

    Energy Technology Data Exchange (ETDEWEB)

    JOLLEY, WENDELL L

    2008-02-05

    On November 9, 2002, the U.S. Environmental Protection Agency, the U.S. Department of Energy, and the Idaho Department of Environmental Quality approved the 'Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites', which required a Site-wide institutional controls plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. This revision identifies and consolidates the institutional controls and operations and maintenance requirements into a single document.

  4. Essays on strategy: hostage rescue planning; maritime theater nuclear capability; strategic psychological operations

    Energy Technology Data Exchange (ETDEWEB)

    Brauer, R.F.; Thomas, R.E.; Kriesel, M.E.

    1985-01-01

    The essays in the volume won recognition in the 1984 Joint Chiefs of Staff Strategy Essay Competition. The volume contains three essays. The author of the first essay considers the requirements for successful planning of hostage rescues, specifically reviewing the Son Tay raid, the Mayaguez crisis, the Entebbe rescue, and the Iranian hostage rescue attempt. The author of the second essay looks at the US Navy's capability for maritime theater nuclear warfare, identifying problems and recommending improvements. The author of the third essay finds the United States lacking a national-level mechanism for coordinating military psychological operations and proposes a way to remedy the problem.

  5. Final Rules for Grandfathered Plans, Preexisting Condition Exclusions, Lifetime and Annual Limits, Rescissions, Dependent Coverage, Appeals, and Patient Protections Under the Affordable Care Act. Final rules.

    Science.gov (United States)

    2015-11-18

    This document contains final regulations regarding grandfathered health plans, preexisting condition exclusions, lifetime and annual dollar limits on benefits, rescissions, coverage of dependent children to age 26, internal claims and appeal and external review processes, and patient protections under the Affordable Care Act. It finalizes changes to the proposed and interim final rules based on comments and incorporates subregulatory guidance issued since publication of the proposed and interim final rules.

  6. Westinghouse Hanford Company operational environmental monitoring annual report, calendar year 1994

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, J.; Fassett, J.W.; Johnson, A.R.; Johnson, V.G.; Markes, B.M.; McKinney, S.M.; Moss, K.J.; Perkins, C.J.; Richterich, L.R.

    1995-08-01

    This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1994 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

  7. Wolf Management Operational Plan Game Management Unit 15A Northern Portion of the Kenai National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this operational plan is to establish a wolf management strategy for the Kenai National Wildlife Refuge that will be jointly implemented by the Fish...

  8. US Department of Energy Nevada Operations Office annual site environmental report, 1992. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Black, S.C.; Latham, A.R.; Townsend, Y.E. [eds.

    1993-09-01

    This report contains the environmental monitoring and assessment results for the Nevada Test Site for 1992. Monitoring and surveillance on and around the NTS by DOE contractors and Site user organizations during 1992 indicated that underground nuclear testing operations were conducted in compliance with regulations, i.e., the dose the maximally exposed offsite individual could have received was less than 0.15 percent of the guideline for air exposure. All 1992 nuclear events took place during the first three quarters of the calendar year prior to the Congressional testing moratorium. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from test operations was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. Using the CAP88-PC model and NTS radionuclide emissions data, the calculated maximum effective dose equivalent offsite would have been 0.012 mrem. Any person receiving this dose was also exposed to 78 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped to EPA-approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Non-NTS support facilities complied with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

  9. Development of BIM Execution Plan for BIM Model Management during the Pre-Operation Phase: A Case Study

    Directory of Open Access Journals (Sweden)

    Yu-Cheng Lin

    2016-02-01

    Full Text Available Building information modeling (BIM technologies use precise geometry and relevant data to enhance and improve the maintenance performance of facilities integrated with 3D object-oriented computer aided design (CAD. Although most owners agree on the potential benefits of integrating BIM technologies with facility management (FM, they must overcome many problems to plan and develop effective BIM execution plans for FM implementation. This study proposes and develops a BIM execution plan for BIM model management for FM during the pre-operation phase. Through the application of the proposed BIM execution plan, BIM can be effectively implemented during the operation and maintenance phases. In order to verify the proposed methodology and demonstrate its effectiveness in practice, the BIM execution plan is then applied in a selected case study of a building project in Taiwan. The combined results demonstrate that the proposed BIM execution plan is an effective approach for operation and maintenance management. The advantage of the proposed BIM execution plan lies not only in improving the efficiency of maintenance management work when integrated with BIM technologies, but also in maximizing the value and benefits of BIM to support maintenance management. Finally, limitations, difficulties, and suggestions are summarized for further development of the BIM execution plan for BIM model management during the pre-operation phase.

  10. Is science the driving force in the operation of environmental regimes? : a case study of the Mediterranean Action Plan

    NARCIS (Netherlands)

    Frantzi, Sofia; Lovett, Jon C.

    2008-01-01

    This study examines the role of science in the operation of environmental regimes using the Barcelona Convention/Mediterranean Action Plan (MAP) as a case study. The ‘epistemic communities’ theory suggests that emergence of the Mediterranean Action Plan was largely driven by scientific experts. In o

  11. College and University Planning -- 1969. Selected Papers from Society for College and University Planning Annual Conference. (4th, Houston, Texas, August 17-20, 1969.)

    Science.gov (United States)

    Mayer, Frederick W., Ed.; Schmult, Carl V., Jr., Ed.

    Six major conference papers cover selected planning activities for eight institutions of higher education. Discussed are academic planning for the University of Houston; circulation, parking, and landscape planning for the University of California at Irvine; planning office organization and staffing at Harvard and Ohio State Universities; building…

  12. Operational Planning of Low-Energy District Heating Systems Connected to Existing Buildings

    DEFF Research Database (Denmark)

    Tol, Hakan; Svendsen, Svend

    2012-01-01

    -energy houses in a traditional DH network, the aim in this paper was given to reduce the dimensions of the low-energy DH network as much as possible. Hence, the performance analyses of the inhouse radiator heating systems equipped in existing buildings were carried out for low temperatures of supply and return......This article focuses on low-energy District Heating (DH) systems operating in low-temperatures such as 55°C in terms of supply and 25°C in terms of return in connection with existing buildings. Since the heat loss from the network has a significant impact in case of supplying heat to low....... The response of the radiator heating systems at different levels of supply temperature was used to form the operational planning of the low-energy DH system, which determined the design parameters of the low-energy DH network in terms of overall mass flow requirement and the return temperature from...

  13. Operational plans for life science payloads - From experiment selection through postflight reporting

    Science.gov (United States)

    Mccollum, G. W.; Nelson, W. G.; Wells, G. W.

    1976-01-01

    Key features of operational plans developed in a study of the Space Shuttle era life science payloads program are presented. The data describes the overall acquisition, staging, and integration of payload elements, as well as program implementation methods and mission support requirements. Five configurations were selected as representative payloads: (a) carry-on laboratories - medical emphasis experiments, (b) mini-laboratories - medical/biology experiments, (c) seven-day dedicated laboratories - medical/biology experiments, (d) 30-day dedicated laboratories - Regenerative Life Support Evaluation (RLSE) with selected life science experiments, and (e) Biomedical Experiments Scientific Satellite (BESS) - extended duration primate (Type I) and small vertebrate (Type II) missions. The recommended operational methods described in the paper are compared to the fundamental data which has been developed in the life science Spacelab Mission Simulation (SMS) test series. Areas assessed include crew training, experiment development and integration, testing, data-dissemination, organization interfaces, and principal investigator working relationships.

  14. Metropolis Parking Problems and Management Planning Solutions for Traffic Operation Effectiveness

    Directory of Open Access Journals (Sweden)

    Yuejun Liu

    2012-01-01

    Full Text Available Advances in mobility are clearly illustrated by the rapid development of urbanization and motorization in developing countries. Following the dramatic incensement of traffic demand, the parking problem has been becoming much more seriously important in many metropolises. With the aim of seeking solutions as to how the parking system could operate more efficiently by using new technologies and new methodologies, this paper discusses the application of geographic information system into the parking planning and management for traffic operation effectiveness in metropolis. The concentration of this paper includes the characteristics of parking demand and the causations of parking problems, especially the basic parking principle and strategies for solving parking problems from the perspective of geographic information system are discussed in enough detail in this paper.

  15. PMU Frequency Data Processing for A Planned Islanding Operation in Bornholm

    DEFF Research Database (Denmark)

    (PMU) system in Bornholm during the planned islanding operation first, as it has high time resolution and it is synchronized to Global Position System (GPS). However, there were some problems with the PMU system during the islanding period, which made the data not as complete as expected. This paper...... describes the problems and provides proposals for a data processing procedure to ensure that the improved frequency data are acceptable for statistics analysis. The proposed data processing procedure is described and evaluated. Furthermore, this paper provides a reference for future PMU data acquisition...... and processing. Individually, section I in the paper generally describes the background for islanding operation and the Bornholm system. Section II introduces the installed PMU measurement system, followed by section III, which describes the PMU original frequency data, the problems during the acquisition...

  16. Stochastic Dynamic Programming Applied to Hydrothermal Power Systems Operation Planning Based on the Convex Hull Algorithm

    Directory of Open Access Journals (Sweden)

    Bruno H. Dias

    2010-01-01

    Full Text Available This paper presents a new approach for the expected cost-to-go functions modeling used in the stochastic dynamic programming (SDP algorithm. The SDP technique is applied to the long-term operation planning of electrical power systems. Using state space discretization, the Convex Hull algorithm is used for constructing a series of hyperplanes that composes a convex set. These planes represent a piecewise linear approximation for the expected cost-to-go functions. The mean operational costs for using the proposed methodology were compared with those from the deterministic dual dynamic problem in a case study, considering a single inflow scenario. This sensitivity analysis shows the convergence of both methods and is used to determine the minimum discretization level. Additionally, the applicability of the proposed methodology for two hydroplants in a cascade is demonstrated. With proper adaptations, this work can be extended to a complete hydrothermal system.

  17. Investigating the efficacy of an intelligent operation planning and support tool for acute healthcare contexts.

    Science.gov (United States)

    Wickramasinghe, Nilmini; Kent, Bridie; Moghimi, Fatemeh Hoda; Nguyen, Lemai; Redley, Bernice; Taylor, Nyree; Muhammed, Imran; Botti, Mari

    2013-01-01

    Nurses are the largest group of healthcare professionals in hospitals providing 24-hour care to patients. Hence, nurses are pivotal in coordinating and communicating patient care information in the complex network of healthcare professionals, services and other care processes. Yet, despite nurses' central role in health care delivery, intelligent systems have historically rarely been designed around nurses' operational needs. This could explain the poor integration of technologies into nursing work processes and consequent rejection by nursing professionals. The complex nature of acute care delivery in hospitals and the frequently interrupted patterns of nursing work suggest that nurses require flexible intelligent systems that can support and adapt to their variable workflow patterns. This study is designed to explore nurses' initial reactions to a new intelligent operational planning and support tool (IOPST) for acute healthcare. The following reports on the first stage of a longitudinal project to use an innovative approach involving nurses in the development of the IOPST; from conceptualization to implementation.

  18. Department of Energy’s ARM Climate Research Facility External Data Center Operations Plan Located At Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Cialella, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Gregory, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Lazar, K. [Brookhaven National Lab. (BNL), Upton, NY (United States); Liang, M. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ma, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tilp, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Wagener, R. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-05-01

    The External Data Center (XDC) Operations Plan describes the activities performed to manage the XDC, located at Brookhaven National Laboratory (BNL), for the Department of Energy’s Atmospheric Radiation Measurement (ARM) Climate Research Facility. It includes all ARM infrastructure activities performed by the Data Management and Software Engineering Group (DMSE) at BNL. This plan establishes a baseline of expectation within the ARM Operations Management for the group managing the XDC.

  19. Research and technology operating plan summary: Fiscal year 1975 research and technology program. [space programs, energy technology, and aerospace sciences

    Science.gov (United States)

    1975-01-01

    Summaries are presented of Research and Technology Operating Plans currently in progress throughout NASA. Citations and abstracts of the operating plans are presented along with a subject index, technical monitor index, and responsible NASA organization index. Research programs presented include those carried out in the Office of Aeronautics and Space Technology, Office of Energy Programs, Office of Applications, Office of Space Sciences, Office of Tracking and Data Acquisition, and the Office of Manned Space Flight.

  20. NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning

  1. Using GOMS and Bayesian plan recognition to develop recognition models of operator behavior

    Science.gov (United States)

    Zaientz, Jack D.; DeKoven, Elyon; Piegdon, Nicholas; Wood, Scott D.; Huber, Marcus J.

    2006-05-01

    Trends in combat technology research point to an increasing role for uninhabited vehicles in modern warfare tactics. To support increased span of control over these vehicles human responsibilities need to be transformed from tedious, error-prone and cognition intensive operations into tasks that are more supervisory and manageable, even under intensely stressful conditions. The goal is to move away from only supporting human command of low-level system functions to intention-level human-system dialogue about the operator's tasks and situation. A critical element of this process is developing the means to identify when human operators need automated assistance and to identify what assistance they need. Toward this goal, we are developing an unmanned vehicle operator task recognition system that combines work in human behavior modeling and Bayesian plan recognition. Traditionally, human behavior models have been considered generative, meaning they describe all possible valid behaviors. Basing behavior recognition on models designed for behavior generation can offers advantages in improved model fidelity and reuse. It is not clear, however, how to reconcile the structural differences between behavior recognition and behavior modeling approaches. Our current work demonstrates that by pairing a cognitive psychology derived human behavior modeling approach, GOMS, with a Bayesian plan recognition engine, ASPRN, we can translate a behavior generation model into a recognition model. We will discuss the implications for using human performance models in this manner as well as suggest how this kind of modeling may be used to support the real-time control of multiple, uninhabited battlefield vehicles and other semi-autonomous systems.

  2. Annual cycle solar energy utilization with seasonal storage. Part 8. Study on periodic steady state of the annual cycle energy system at a practical operation; Kisetsukan chikunetsu ni yoru nenkan cycle taiyo energy riyo system ni kansuru kenkyu. 8

    Energy Technology Data Exchange (ETDEWEB)

    Tanaka, H.; Okumiya, M. [Nagoya University, Nagoya (Japan)

    1997-11-25

    A study was made of the periodic steady state of the annual cycle solar energy system with seasonal heat storage at a practical operation. Cold heat in winter and warm heat in summer are stored in the seasonal storage tank, and these are each used in shift until when demand for cold/warm heat appears. Moreover, gap in quantity of cold/warm heat going in/out of the heat storage tank during a year is filled by natural energy such as solar energy, so that the system can be operated in annual cycles. Studies were conducted of the periodic unsteady term and the problem on lowering of performance during the term such as the periodic unsteady term of water temperature inside the seasonal heat storage tank and temperature of the soil around the storage tank, and the level of lowering of performance during the term, necessity of additional operation/control at the start of operation and aged deterioration of the system. Within the assumption, even if starting operation in any time of the year, the system could show the performance almost expected from the first operation year with no additional system operation and control required only at the start of operation. It is thought that the heat source selection control of heat pump largely contributes to this. 4 refs., 5 figs., 3 tabs.

  3. Operation planning of electrical power systems; Planeacion de operacion de sistemas electricos de potencia

    Energy Technology Data Exchange (ETDEWEB)

    Rivas, Elena [ed.] [Instituto de Investigaciones Electricas, Temixco, Morelos (Mexico)

    1999-07-01

    The development of a software that has facilitated and improved considerably the planning tasks, besides diminishing the production costs is presented. The software denominated Hydrothermal Coordination (HTC)(Coordinacion Hidrotermica (CHT)), was developed in the Instituto de Investigaciones Electricas (IIE), with this software the plan of short term operation of the generating units is determined. The software analyzes mathematically a great number of options regarding to the allocation of generation units and selects very close solutions, in cost, to the optimal one. It constitutes in addition an information system that stores the relevant data of each unit, useful for decision making. [Spanish] Se presenta el desarrollo de un software que ha facilitado y mejorado considerablemente las tareas de planeacion, ademas de disminuir los costos de produccion. El paquete denominado Coordinacion Hidrotermica (CHT), fue desarrollado en el Instituto de Investigaciones Electricas (IIE); con el se determina el plan de operacion a corto plazo de las unidades generadoras. El paquete analiza matematicamente un gran numero de opciones en lo que se refiere a la asignacion de unidades de generacion y selecciona soluciones muy cercanas, en costo, a la optima. Constituye ademas un sistema de informacion que almacena los datos relevantes de cada unidad, utiles para la toma de decisiones.

  4. Task Allocation and Path Planning for Collaborative Autonomous Underwater Vehicles Operating through an Underwater Acoustic Network

    Directory of Open Access Journals (Sweden)

    Yueyue Deng

    2013-01-01

    Full Text Available Dynamic and unstructured multiple cooperative autonomous underwater vehicle (AUV missions are highly complex operations, and task allocation and path planning are made significantly more challenging under realistic underwater acoustic communication constraints. This paper presents a solution for the task allocation and path planning for multiple AUVs under marginal acoustic communication conditions: a location-aided task allocation framework (LAAF algorithm for multitarget task assignment and the grid-based multiobjective optimal programming (GMOOP mathematical model for finding an optimal vehicle command decision given a set of objectives and constraints. Both the LAAF and GMOOP algorithms are well suited in poor acoustic network condition and dynamic environment. Our research is based on an existing mobile ad hoc network underwater acoustic simulator and blind flooding routing protocol. Simulation results demonstrate that the location-aided auction strategy performs significantly better than the well-accepted auction algorithm developed by Bertsekas in terms of task-allocation time and network bandwidth consumption. We also demonstrate that the GMOOP path-planning technique provides an efficient method for executing multiobjective tasks by cooperative agents with limited communication capabilities. This is in contrast to existing multiobjective action selection methods that are limited to networks where constant, reliable communication is assumed to be available.

  5. 26 CFR 1.125-3 - Effect of the Family and Medical Leave Act (FMLA) on the operation of cafeteria plans.

    Science.gov (United States)

    2010-04-01

    ...) on the operation of cafeteria plans. 1.125-3 Section 1.125-3 Internal Revenue INTERNAL REVENUE... operation of cafeteria plans. The following questions and answers provide guidance on the effect of the Family and Medical Leave Act (FMLA), 29 U.S.C. 2601 et seq., on the operation of cafeteria plans:...

  6. Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

  7. Employing Multiple Unmanned Aerial Vehicles for Co-Operative Path Planning

    Directory of Open Access Journals (Sweden)

    Durdana Habib

    2013-05-01

    Full Text Available In this paper, we work to develop a path planning solution for a group of Unmanned Aerial Vehicles (UAVs using a Mixed Integer Linear Programming (MILP approach. Co‐operation among team members not only helps reduce mission time, it makes the execution more robust in dynamic environments. However, the problem becomes more challenging as it requires optimal resource allocation and is NP‐hard. Since UAVs may be lost or may suffer significant damage during the course of the mission, plans may need to be modified in real‐time as the mission proceeds. Therefore, multiple UAVs have a better chance of completing a mission in the face of failures. Such military operations can be treated as a variant of the Multiple Depot Vehicle Routing Problem (MDVRP. The proposed solution must be such that m UAVs start from multiple source locations to visit n targets and return to a set of destination locations such that (1 each target is visited exactly by one of the chosen UAVs (2 the total distance travelled by the group is minimized and (3 the number of targets that each UAV visits may not be less than K or greater than L.

  8. Operational Readiness Review Plan for the Radioisotope Thermoelectric Generator Materials Production Tasks

    Science.gov (United States)

    Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.

    1990-04-19

    In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.

  9. A modularized framework for sales and operations planning with focus on process industries

    Directory of Open Access Journals (Sweden)

    Sayeh Noroozi

    2016-01-01

    Full Text Available This paper suggests a modularized sales and operations planning (S&OP framework, consisting of content and process. The framework’s content is based on a typology of decoupling points in which the effect of decoupling points on the decision variables in S&OP is studied. The framework’s process takes a step back and addresses the need for a more elaborate design to precede the operational use of S&OP content for different production contexts. The framework supports both process industries (PIs and discrete manufacturing industries (DIs, and recognizes their specific requirements and reflects them in their S&OP. The differentiating characteristics of PIs and DIs are emphasized through three different decoupling points, namely: discretization decoupling point, control mode decoupling point, and customer order decoupling point. The suggested framework aims to fill the gap in the literature regarding the lack of aggregate planning processes that match the PIs’ specific requirements by reflecting the differentiating characteristics of PIs in S&OP.

  10. Use of the Homeland-Defense Operational Planning System (HOPS) for Emergency Management

    Energy Technology Data Exchange (ETDEWEB)

    Durling, Jr., R L; Price, D E

    2005-12-16

    The Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging Lawrence Livermore National Laboratory's expertise in weapons systems and in sparse information analysis to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented.

  11. Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    Energy Technology Data Exchange (ETDEWEB)

    Price, D E; Durling, R L

    2005-10-10

    The Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging Lawrence Livermore National Laboratory's expertise in weapons systems and in sparse information analysis to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented.

  12. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  13. Macro-FF: Improving AI Planning with Automatically Learned Macro-Operators

    CERN Document Server

    Botea, A; Mueller, M; Schaeffer, J; 10.1613/jair.1696

    2011-01-01

    Despite recent progress in AI planning, many benchmarks remain challenging for current planners. In many domains, the performance of a planner can greatly be improved by discovering and exploiting information about the domain structure that is not explicitly encoded in the initial PDDL formulation. In this paper we present and compare two automated methods that learn relevant information from previous experience in a domain and use it to solve new problem instances. Our methods share a common four-step strategy. First, a domain is analyzed and structural information is extracted, then macro-operators are generated based on the previously discovered structure. A filtering and ranking procedure selects the most useful macro-operators. Finally, the selected macros are used to speed up future searches. We have successfully used such an approach in the fourth international planning competition IPC-4. Our system, Macro-FF, extends Hoffmanns state-of-the-art planner FF 2.3 with support for two kinds of macro-operato...

  14. Ptolemy operations at the surface of a comet, from planning to reality

    Science.gov (United States)

    Morse, A. D.; Andrews, D. J.; Morgan, G. H.; Sheridan, S.; Barber, S. J.; Wright, I. P.

    2016-08-01

    Ptolemy is a Gas Chromatograph-Isotope Ratio-Mass Spectrometer (GC-IR-MS) aboard the Philae lander element of the Rosetta mission to comet 67P/Churyumov-Gerasimenko. Developed to determine the chemical and stable light isotopic composition of cometary material, Ptolemy was conceived as a highly flexible instrument able to accommodate changes in operational functionality via software modification. This was considered essential to allow for different modes of operation not only in response to rapid/unexpected changes and opportunities, but also to longer-term shifts in priorities as the overall mission plan (and indeed cometary science in general) changed during the decades from initial concept to landing. Against the backdrop of events of the Philae landing, this paper describes the methods of instrument operation and rational behind them used to achieve the Ptolemy scientific results during the period 12-14th November 2014. In particular we demonstrate the importance of a flexible modular approach to the instrument architecture enabling complex instrument operations, especially in a situation where the environment of exploration is effectively unknown and some of the engineering solutions were being tested in the field for the first time.

  15. Assessing interdependent operational, tactical and strategic risks for improved utility master plans.

    Science.gov (United States)

    Luís, Ana; Lickorish, Fiona; Pollard, Simon

    2015-05-01

    Risk management plays a key role in water utilities. Although risk tools are well-established at operational levels, approaches at the strategic level are rarely informed by systemic assessments of the water supply and lack a long-term perspective. Here, we report a baseline strategic risk analysis, founded on a systemic analysis of operational risks developed 'bottom-up' and validated in a large water utility. Deploying an action-oriented research method, supported by semi- structured interviews with in-house water utility risk experts, deep connections are established between operational risk and strategic risk that surpass those existing elsewhere in the sector. Accessible presentational formats - influence diagrams, risk "heat-maps" and supporting narratives are used to promote Board-level risk discussions, and characterise a baseline set of strategic risks core to forward utility master planning. Uniquely, the influence of operational events, exposures and potential harms, together with the mitigating measures in place to mediate these risks are linked to corporate objectives on business sustainability, profitability, water quality, water quantity, supply disruption and reputation.

  16. US Department of Energy Nevada Operations Office annual site environmental report: 1993. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Black, S.C.; Glines, W.M.; Townsend, Y.E. [eds.

    1994-09-01

    Monitoring and surveillance on and around the Nevada Test Site (NTS) by DOE contractors and NTS user organizations during 1993 indicated that operations on the NTS were conducted in compliance with applicable federal and DOE guidelines, i.e., the dose the maximally exposed offsite individual could have received was less than 0.04 percent of the 10 mrem per year guide for air exposure. No nuclear tests were conducted due to the moratorium. All discharges of radioactive liquids remained onsite in containment ponds, and there was no indication of potential migration of radioactivity to the offsite area through groundwater. Surveillance around the NTS indicated that airborne radioactivity from diffusion, evaporation of effluents, or resuspension was not detectable offsite, and no measurable net exposure to members of the offsite population was detected through the offsite dosimetry program. Using the CAP88-PC model and NTS radionuclide emissions data, the calculated effective dose equivalent to the maximally exposed individual offsite would have been 0.004 mrem. Any person receiving this dose would also have received 97 mrem from natural background radiation. There were no nonradiological releases to the offsite area. Hazardous wastes were shipped offsite to approved disposal facilities. Compliance with the various regulations stemming from the National Environmental Policy Act is being achieved and, where mandated, permits for air and water discharges and waste management have been obtained from the appropriate agencies. Support facilities at off-NTS locations compiled with the requirements of air quality permits and state or local wastewater discharge and hazardous waste permits.

  17. Umatilla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Loffink, Ken; Duke, Bill

    2008-12-31

    adult Pacific lamprey was trapped and released above the Westland ladder this year. The Threemile Dam west bank juvenile bypass was opened on March 11, 2008 in conjunction with water deliveries and continued through the summer. West Extension Irrigation District (WEID) discontinued diverting live flow on June 24, 2008 but the bypass remained open throughout the project year. The juvenile trap was not operated this project year.

  18. Umatilla River Fish Passage Operations Program, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2004-03-01

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 17, 2002 to September 29, 2003. A total of 3,080 summer steelhead (Oncorhynchus mykiss); 1716 adult, 617 jack, and 1,709 subjack fall chinook (O. tshawytscha); 3,820 adult and 971 jack coho (O. kisutch); and 3,607 adult and 135 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 6 summer steelhead and 330 adult and 49 jack spring chinook were hauled upstream from Threemile Dam. There were 2,882 summer steelhead; 1161 adult, 509 jack and 1,546 subjack fall chinook; 3,704 adult and 915 jack coho; and 2,406 adult and 31 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 109 summer steelhead; 532 adult and 32 jack fall chinook; and 560 adult and 28 jack spring chinook were collected for brood. In addition, 282 spring chinook were collected for the outplanting efforts in the Walla Walla Basin. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 159 days between January 27 and July 4, 2003. During that period, fish were bypassed back to the river 145 days and were trapped 11 days. An estimated 205 pounds of juvenile fish were transported from Westland to the Umatilla River boat ramp (RM 0.5). Approximately 82% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was opened on September 16, 2002. and continued until November 1, 2002. The bypass was reopened March 3, 2003 and ran until July 3, 2003. The juvenile trap was operated by the Umatilla Passage Evaluation

  19. Umatilla River Fish Passage Operations Program, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zimmerman, Brian C. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2003-02-01

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, Oregon is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 22, 2001 to September 12, 2002. A total of 5,519 summer steelhead (Oncorhynchus mykiss); 1,146 adult, 1,158 jack, and 970 subjack fall chinook (O. tshawytscha); 22,792 adult and 80 jack coho (O. kisutch); and 5,058 adult and 188 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 261 adult and 14 jack spring chinook were hauled upstream from Threemile Dam for release. There were 5,359 summer steelhead; 622 adult, 1,041 jack and 867 subjack fall chinook; 22,513 adult and 76 jack coho; and 4,061 adult and 123 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. In addition, 110 summer steelhead; 462 adult and 24 jack fall chinook; and 560 adult and 28 jack spring chinook were collected for brood. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 141 days between February 22 and July 12, 2002. During that period, fish were bypassed back to the river 134 days and were trapped 5 days. An estimated 200 pounds of juvenile fish were transported from Westland. Approximately 90% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was opened August 16, 2002. The bypass was run until October 31, 2001 with the exception of the period from August 29 to September 16. The bypass was reopened March 7, 2002 and ran until July 8. The juvenile trap was operated from July 8 to July 12 by the Umatilla Passage Evaluation project.

  20. Umatilla River Fish Passage Operations Program, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2005-08-01

    . The juvenile bypass ran at the 5 cfs level until the initiation of Phase I on August 15, 2004. The juvenile trap was operated by the Oregon Department of Fish and Wildlife (ODFW) under the Evaluation of Umatilla Juvenile Salmonid Outmigration Project.