WorldWideScience

Sample records for analysis project 1987-1997

  1. Assessment of Smolt Condition for Travel Time Analysis Project, 1987-1997 Project Review.

    Energy Technology Data Exchange (ETDEWEB)

    Schrock, Robin M.; Hans, Karen M.; Beeman, John W. [US Geological Survey, Western Fisheries Research Center, Columbia River Research Laboratory, Cook, WA

    1997-12-01

    The assessment of Smolt Condition for Travel Time Analysis Project (Bonneville Power Administration Project 87-401) monitored attributes of salmonid smolt physiology in the Columbia and Snake River basins from 1987 to 1997, under the Northwest Power Planning Council Fish and Wildlife Program, in cooperation with the Smolt Monitoring Program of the Fish Passage Center. The primary goal of the project was to investigate the physiological development of juvenile salmonids related to migration rates. The assumption was made that the level of smolt development, interacting with environmental factos such as flow, would be reflected in travel times. The Fish Passage Center applied the physiological measurements of smolt condition to Water Budget management, to regulate flows so as to decrease travel time and increase survival.

  2. The entry mode choice of EU leading companies (1987-1997)

    OpenAIRE

    Giampaolo Vitali

    1999-01-01

    The aim of the paper is to provide empirical evidence on the relationship between industrial structure and M&A process. We focus on the determining factors fostering a firm to choose controlling acquisitions or non-controlling ones. We use the Acquisitions and Divestments Database (ADD), a data-base collecting equity operations made by top-90 EU leaders in the period 1987-1997. A logit analysis shows some variables that increase the probability that the firm’s entry mode choice is a non-contr...

  3. Cambio tecnológico y crecimiento económico industrial. Impactos sobre la estructura ocupacional en la industria manufacturera colombiana (1987 - 1997.

    Directory of Open Access Journals (Sweden)

    Manuel Guillermo Bonilla

    2010-05-01

    Full Text Available Este ensayo investiga las tendencias más relevantes en las variables básicas del comportamiento económico, de cambio tecnológico e innovación en la estructura industrial colombiana, con énfasis en el efecto del crecimiento sectorial sobre los niveles de ocupación. El ensayo indaga sobre las capacidades sectoriales para la producción de innovación tecnológica asociadas con el desempeño de la productividad multifactorial y la evolución de empleo a lo largo del período 1987 - 1997. Constata si las grandes variaciones en el empleo se deben al aumento que pudieran experimentar algunas industrias en sus niveles de intensidad de capital, productividades factoriales y cambio tecnológico, aspectos relevantes al propósito de explicar las transformaciones sectoriales ocurridas en la estructura industrial colombiana a lo largo de los primeros años de la apertura económica.

  4. Determinantes políticos do déficit fiscal nos estados brasileiros (1987-1997

    Directory of Open Access Journals (Sweden)

    Cristiane Batista

    2010-02-01

    Full Text Available O objetivo do trabalho é analisar os determinantes do balanço fiscal nos estados brasileiros em um período de grande instabilidade da economia do país: as décadas de 1980 e 1990. O argumento principal do trabalho postula que, mesmo em um contexto de ajuste fiscal, fatores ligados à inclinação ideológica do chefe do poder Executivo estadual, à capacidade decisória do poder Legislativo nesse nível de governo, bem como a relação entre estados e governo federal são parâmetros fundamentais para o entendimento da situação fiscal da federação brasileira. A metodologia empregada para verificar o modelo teórico corresponde à análise econométrica de painel, também conhecida como séries agregadas (em inglês: pooled time series - cross section analysis, que nos permite considerar concomitantemente a dimensão espaço (estados e a dimensão tempo (ano. Na estimação dos parâmetros do modelo, seguimos o método "panel corrected standard error" (OLS com erro padrão corrigido, sugerido por Beck e Katz para análises de painel de dimensões similares às do presente trabalho. Nossos resultados corroboram a previsão da importância de se considerar as subunidades da federação. As análises que buscam explicar o desempenho da administração macroeconômica nacional não podem deixar de levar em conta a relevância das instituições subnacionais e seu impacto na estrutura de incentivos dos atores envolvidos nos processos decisórios.

  5. Russian Language Analysis Project

    Science.gov (United States)

    Serianni, Barbara; Rethwisch, Carolyn

    2011-01-01

    This paper is the result of a language analysis research project focused on the Russian Language. The study included a diverse literature review that included published materials as well as online sources in addition to an interview with a native Russian speaker residing in the United States. Areas of study include the origin and history of the…

  6. HSAPS market analysis project

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckner, Ronny; Aaberg, Rolf Jarle

    2006-12-15

    The H-SAPS (Hydrogen Stand-Alone Power System) project, an EU project within the ALTENER programme in the period 2002-2004, was initiated to determine the potential for the introduction of environmentally benign hydrogen technology in what is believed to be a near-term market, namely stand-alone power systems (SAPS). The objective of the project was to examine the technological, political, social and economical factors affecting the emergence of hydrogen technology in the stand-alone power system market today and in the future. The scope of the project was limited to small and medium sized stand-alone power systems, up to a few hundred kilowatts (kW) power rating and based on renewable energy as the primary energy source. The work was divided into five phases: (1) Inception, (2) Data collection and analysis, (3) Market analysis and barrier removal, (4) Dissemination, and (5) Final report. Separate reports were written on these topics, and later summarised this final report. The H-SAPS-project identified the following critical technical barriers (in prioritized order): (1) High costs of both electrolyser and fuel cell solutions, (2) Short lifetime warranties and little lifetime experience for PEM electrolysers and PEM fuel cells, (3) Low energy efficiency of the hydrogen energy system (critical for small systems), and (4) The need to develop easy-to-use and energy efficient gas and electricity control systems. One of the main conclusions from the project is that there is a need to focus on interim solutions, based on conventional energy technologies (e.g., internal combustion engines instead of fuel cells), in order for H-SAPS to compete in the near-term SAPS-market (author) (ml)

  7. HSAPS market analysis project

    International Nuclear Information System (INIS)

    The H-SAPS (Hydrogen Stand-Alone Power System) project, an EU project within the ALTENER programme in the period 2002-2004, was initiated to determine the potential for the introduction of environmentally benign hydrogen technology in what is believed to be a near-term market, namely stand-alone power systems (SAPS). The objective of the project was to examine the technological, political, social and economical factors affecting the emergence of hydrogen technology in the stand-alone power system market today and in the future. The scope of the project was limited to small and medium sized stand-alone power systems, up to a few hundred kilowatts (kW) power rating and based on renewable energy as the primary energy source. The work was divided into five phases: (1) Inception, (2) Data collection and analysis, (3) Market analysis and barrier removal, (4) Dissemination, and (5) Final report. Separate reports were written on these topics, and later summarised this final report. The H-SAPS-project identified the following critical technical barriers (in prioritized order): (1) High costs of both electrolyser and fuel cell solutions, (2) Short lifetime warranties and little lifetime experience for PEM electrolysers and PEM fuel cells, (3) Low energy efficiency of the hydrogen energy system (critical for small systems), and (4) The need to develop easy-to-use and energy efficient gas and electricity control systems. One of the main conclusions from the project is that there is a need to focus on interim solutions, based on conventional energy technologies (e.g., internal combustion engines instead of fuel cells), in order for H-SAPS to compete in the near-term SAPS-market (author) (ml)

  8. Project Planning: An Analysis

    Directory of Open Access Journals (Sweden)

    Dr.S.S.Riaz Ahamed

    2010-01-01

    Full Text Available The purpose of the Planning stage is to analyze the project in terms of work breakdown, cost, resources, and timing. At the end of this stage all team members should be clear on the sub tasks and deliverables with the project, the time constraints they are working too and the roles and responsibilities that are expected from them.Software Project Plan defines what the work is, and how this work can be completed. This plan is developed at the beginning of the software project and is continually refined and improved as the work rocesses. It can be useful to management as a frame work for review and control the process of developing the software. Additionally, the Software Project Plan can define each of the major tasks and estimate the time and resources that are required to complete these tasks.

  9. Weatherization Partnerships Project, Grant No. DE FG 0299EE27594, October 1, 1999 - December 31, 2000. Final Technical Report and FY 1999 version of 'Lessons learned the long way: Integrating utility, energy efficiency tasks with weatherization'

    Energy Technology Data Exchange (ETDEWEB)

    Power, Meg

    2002-11-01

    Includes reports on (1) the results of focus groups on managing utility residential efficiency [attitudes?] for low-income housing, and (2) low-income household energy consumption and expenditures patterns and weatherization opportunities 1987-1997, intensive analysis of R.E.C.S. data.

  10. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  11. Economic Analysis for Health Projects.

    OpenAIRE

    Hammer, Jeffrey S.

    1997-01-01

    The author applies to the health sector an approach to analyzing projects advocated in a recent paper by Devarajan, Squire, and Suthiwart-Narueput. In the health sector, a project evaluation should: 1) Establish a firm justification for public involvement. The author identifies a number of common failures in the markets for both health services and insurance but argues that this should be the starting place for economic analysis, not a reason to ignore economics; 2) Establish the counterfactu...

  12. Economic Analysis of World Bank Education Projects and Project Outcomes

    Science.gov (United States)

    Vawda, Ayesha Yaqub; Moock, Peter; Gittinger, J. Price; Patrinos, Harry Anthony

    2003-01-01

    This paper tests the hypothesis that World Bank education projects have a higher likelihood of being successful if at the time of appraisal, they underwent good quality economic analysis. Analysis shows a strong relationship between the quality of cost-benefit analysis and cost-effectiveness analysis and the quality of project outcomes. Economic…

  13. Projected principal component analysis in factor models

    OpenAIRE

    Fan, Jianqing; Liao, Yuan; Wang, Weichen

    2014-01-01

    This paper introduces a Projected Principal Component Analysis (Projected-PCA), which employees principal component analysis to the projected (smoothed) data matrix onto a given linear space spanned by covariates. When it applies to high-dimensional factor analysis, the projection removes noise components. We show that the unobserved latent factors can be more accurately estimated than the conventional PCA if the projection is genuine, or more precisely, when the factor loading matrices are r...

  14. Applying economic analysis to technical assistance projects

    OpenAIRE

    McMahon, Gary

    1997-01-01

    The author recommends using more quantitative economic analysis in appraising technical assistance loans and loan components. After giving a brief history of tecnhical assistance and the problems commonly associated with it, he describes classifications of technical assistance, proposes a new typology to be used for project appraisal, suggests methods for screening projects, and discusses different levels of economic analysis. He shows how the typology and economic analysis could be applied t...

  15. Project cost analysis under risk

    OpenAIRE

    Florica LUBAN; Daniela HINCU

    2010-01-01

    In this paper, an integrated approach based on Monte Carlo simulation and Six Sigma methodology is used to analyze the risk associated with a project's total cost. Monte Carlo simulation is applied to understand the variability in total cost caused by the probabilistic cost items. By Six Sigma methodology the range of variation of the project cost can be reduced by operating on the input factors with the greatest impact on total cost to cover the variation of 6 between the limits that were e...

  16. Starategic Stakeholder Analysis in Project Networks

    OpenAIRE

    Nassaj Ghayeshghoorshagh, Alireza

    2013-01-01

    Current technics of project stakeholder management are analyzing a dyadic relation and engagement with stakeholders based on their individual attributes. However in real world you can hardly find isolated relations. Based on Social Network Analysis (SNA) any change in one relation has ramifications on others. Therefore it can be said that the interaction of different actors and specially the project manager with the other actors need to be considered more. Those who implement project stakeho...

  17. Space Mission Human Reliability Analysis (HRA) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The purpose of this project is to extend current ground-based Human Reliability Analysis (HRA) techniques to a long-duration, space-based tool to more effectively...

  18. Supplement analysis, Southpoint power project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-16

    The Calpine Corporation applied to interconnect its proposed power plant with the Western Area Power Administration`s (Western) Parker-Davis project in western Arizona. Western, as a major electric transmission system owner is required by existing policies and regulations, to provide access to its transmission system, when requested by an eligible organization. The proposed interconnection would integrate a major source of new generation into the Parker-Davis system which would allow Calpine to supply its power to the electric wholesale market. Based on this application, Western`s proposed action is to enter into an interconnection agreement with Calpine.

  19. Small Sat Analysis Laboratory Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Develop Small Satellite Analysis Laboratory (SatLab): A simulation-of-simulations framework to integrate component and engineering simulations into a single larger...

  20. Kaqchikel Maya Language Analysis Project

    Science.gov (United States)

    Eddy de Pappa, Sarah

    2010-01-01

    The purpose of this analysis was to study the linguistic features of Kaqchikel, a Mayan language currently spoken in Guatemala and increasingly in the United States, in an effort to better prepare teachers of English as a second language (ESL) or English as a foreign language (EFL) to address the distinct needs of a frequently neglected and…

  1. Landsat 4-5 TM: 1987-1997

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — The Global Land Survey (GLS) datasets are a collection of orthorectified, cloud-minimized Landsat-type satellite images, providing near complete coverage of the...

  2. Institutional solutions to economic problems in mexico: 1987-1997

    OpenAIRE

    Juan Manuel Ortega Riquelme

    2004-01-01

    El autor efectúa un análisis respecto al manejo de la crisis económica vivida en México durante ese periodo, y cómo las acciones emprendidas por los actores relevantes: el gobierno, el empresariado y las organizaciones de la clase trabajadora, han permitido el reforzamiento de las instituciones y la generación de espacios permanentes de diálogo y de generación de compromisos tripartitos, lo que ha permitido generar estabilidad económica y fortalecer la institucionalidad democrática....

  3. The sensitivity analysis of population projections

    Directory of Open Access Journals (Sweden)

    Hal Caswell

    2015-10-01

    Full Text Available Background: Population projections using the cohort component method can be written as time-varyingmatrix population models. The matrices are parameterized by schedules of mortality, fertility,immigration, and emigration over the duration of the projection. A variety of dependentvariables are routinely calculated (the population vector, various weighted population sizes, dependency ratios, etc. from such projections. Objective: Our goal is to derive and apply theory to compute the sensitivity and the elasticity (proportional sensitivity of any projection outcome to changes in any of the parameters, where those changes are applied at any time during the projection interval. Methods: We use matrix calculus to derive a set of equations for the sensitivity and elasticity of any vector valued outcome ξ(t at time t to any perturbation of a parameter vector Ɵ(s at anytime s. Results: The results appear in the form of a set of dynamic equations for the derivatives that areintegrated in parallel with the dynamic equations for the projection itself. We show resultsfor single-sex projections and for the more detailed case of projections including age distributions for both sexes. We apply the results to a projection of the population of Spain, from 2012 to 2052, prepared by the Instituto Nacional de Estadística, and determine the sensitivity and elasticity of (1 total population, (2 the school-age population, (3 the population subject to dementia, (4 the total dependency ratio, and (5 the economicsupport ratio. Conclusions: Writing population projections in matrix form makes sensitivity analysis possible. Such analyses are a powerful tool for the exploration of how detailed aspects of the projectionoutput are determined by the mortality, fertility, and migration schedules that underlie theprojection.

  4. Cost analysis of center Cerknica project

    OpenAIRE

    Ćorić, Samir

    2007-01-01

    The thesis deals with the preparation of a detailed time schedule and financial plan, as well as detailed cost analysis of planned and as-built construction works during execution of the building under consideration. The first part consists of 4 chapters that deal with theoretical background which is used in subsequent chapters where the cost analysis is performed. The introduction presents the fundamentals of project management. Further, phases and special features of a constr...

  5. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  6. Research reactor job analysis - A project description

    International Nuclear Information System (INIS)

    Addressing the need of the improved training in nuclear industry, nuclear utilities established training program guidelines based on Performance-Based Training (PBT) concepts. The comparison of commercial nuclear power facilities with research and test reactors owned by the U.S. Department of Energy (DOE), made in an independent review of personnel selection, training, and qualification requirements for DOE-owned reactors pointed out that the complexity of the most critical tasks in research reactors is less than that in power reactors. The U.S. Department of Energy (DOE) started a project by commissioning Oak Ridge Associated Universities (ORAU) to conduct a job analysis survey of representative research reactor facilities. The output of the project consists of two publications: Volume 1 - Research Reactor Job Analysis: Overview, which contains an Introduction, Project Description, Project Methodology,, and. An Overview of Performance-Based Training (PBT); and Volume 2 - Research Reactor Job Analysis: Implementation, which contains Guidelines for Application of Preliminary Task Lists and Preliminary Task Lists for Reactor Operators and Supervisory Reactor Operators

  7. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  8. Projection Theory and Its Application into Media Discourse Analysis

    Institute of Scientific and Technical Information of China (English)

    邵宏

    2008-01-01

    Projection is a kind of logical-semantic relation which refers to the phenomenon that the secondary clause is projected through the primary clause, which instates it as a locution or an idea. Halliday conducts the basic research on projection from the functional perspective. Then Martin and Zeng try to develop Halliday's projection theory, resulting in a comprehensive framework of projection. Finally the projection theory is applied into the analysis of a sample media discourse. And projection theory is of great help in its application into media discourse analysis.

  9. Towards sentiment analysis application in housing projects

    Science.gov (United States)

    Mahadzir, Nurul Husna; Omar, Mohd Faizal; Nawi, Mohd Nasrun Mohd

    2016-08-01

    In becoming a develop nation by 2020, Malaysia Government realized the need in providing affordable house to the public. Since Second Malaysia Plan, government has implemented various affordable housing projects and it continues until recent Malaysia Plan. To measure the effectiveness of the initiatives taken, public opinion is necessary. A social media platform has been seen as the most effective mechanism to get information on people's thought and feeling towards certain issues. One of the best ways to extract emotions and thoughts from what people post in social media is through Sentiment Analysis (SA). There are three different levels of analysis: document level, sentence level and feature level. Most of previous research focused on the classification of sentiment at document or sentence level. Unfortunately, both document and sentence level does not discover what exactly people like or not. While the analysis based on feature, there exist accuracy problem when classifying the sentiment scores. This paper will propose a new framework that focuses on sentiment classification scores at feature level to overcome the uncertainty and accuracy issues on the result.

  10. Financial analysis of wind power projects

    International Nuclear Information System (INIS)

    In this work a financial assessment of the economic competitiveness of wind power projects in Argentina compared with other no CO2 emission sources, such as nuclear, was developed. Argentina has a market driven electrical grid system, and no greenhouse gas emissions penalty taxes, together with a very low natural gas cost and a sustained nuclear development program. For the financial analysis an average wind velocity source of 8 m/s, on several wind farms (from 2 machines to 60) built with new technology wind generators (750 kilowatts power, 900 dollar/kilowatt cost) operating over 20 years, was considered. The leveled cost obtained is decreasing while the number of machines is increasing, from 0,130 dollar/kilowatt-hour to 0,090 dollar/kilowatts-hour. This poor performance can be partially explained considering the higher interest rates in the argentine financial market (15%) than the ones in developed countries

  11. Analysis and projections of physics in Chile

    International Nuclear Information System (INIS)

    In the present work, an assessment of the Physics research capacity in Chile is presented. For this, the period between 2000 and June 2005 has been studied. In this period almost 200 physicists have contributed to scientific production in terms of ISI publications. Amongst these 200, ∼160 correspond to theoretical physicists and only ∼40 to experimental physicists; ∼178 are men and only ∼22 are women. A more detailed analysis shows that ∼160 physicists have at least one appearance in ISI publications per year considering the last 3 years. Ten years ago, a similar criteria (at least one appearance per year in ISI articles, considering mobile three-year periods), the number of active physicists in the Chilean community was estimated at 70. Therefore, the Chilean active physicists' community has doubled in 10 years. There exist 20 centres in which scientific research is developed: 18 university centres, a government institute and a private institute. As regards scientific productivity, both as related to disciplines or research areas, and well as in relation to research centres, it is found that, generally, scientific production, in a particular area in Physics or in a research centre, is directly related to the number of corresponding researchers; that is to say, the percentage of the national productivity in an area or research centre corresponds to its share in the total number of physicists in the country. A geographical analysis shows that 50% of the productivity corresponds to Santiago and 50% to the rest of the country. The impact of the different funds for research is assessed, also: FONDECYT, Presidential Chairs and large projects and centres of excellence. According to Physics researchers opinion, Fondo Nacional de Ciencia y TecnologIa (FONDECYT, National Fund fro Science and Technology) has become the best instrument to support researchi activities in Chile. However, the amount of projects awarded has practically not been increased, which is

  12. Project Management Maturity Analysis in the Serbian Energy Sector

    OpenAIRE

    Marko M. Mihic; Dejan C. Petrovic; Vladimir Lj. Obradovic; Aleksandar M. Vuckovic

    2015-01-01

    In this paper we will present an analysis of the current state of practice in project management in the energy sector in Serbia, wherein the mentioned analysis is based on the results of original research on project maturity in this field. This paper includes a literature review about the current situation in the Serbian energy system, the basic concepts and significance of the research of project maturity in organizations, the basic concepts related to the projects in the energy sector, as w...

  13. Analysis of Effectiveness Measures of Construction Project Success in Malaysia

    OpenAIRE

    Roshana Takim; Hamimah Adnan

    2009-01-01

    Project effectiveness measures are normally used by most researchers and practitioners to judge project performance and project success.  This paper provides an empirical analysis of measures of success in terms of effectiveness performance in the development of construction projects in Malaysia.  A survey was conducted in Malaysia among the four project stakeholders: the Government, private clients, consultants, and contractors.  In total 93 respondents completed the questionnaire. Lists of ...

  14. Lac Courte Oreilles Energy Analysis Project

    Energy Technology Data Exchange (ETDEWEB)

    Leslie Isham; Denise Johnson

    2009-04-01

    assessment and funding to do so will be sought. While we already are in ownership of a Hydro Dam it is currently not functioning to its full capacity we are seeking operation and maintenance firm proposals and funding sources. One of our biggest accomplishment this project gave us was our total Carbon Emissions 9989.45 tons, this will be the number that we will use to base our reductions from. It will help us achieve our goals we have set for ourselves in achieving the Kyoto Protocol and saving our Earth for our future generations. Another major accomplishment and lesson learned is we need to educate ourselves and our people on how to conserve energy to both impact the environment and our own budgets. The Lac Courte Oreilles (LCO) Energy Analysis Project will perform an energy audit to gather information on the Tribe's energy usage and determine the carbon emissions. By performing the audit we will be able to identify areas where conservation efforts are most viable and recommend policies that can be implemented. These steps will enable LCO to begin achieving the goals that have been set by the Tribal Governing Board and adopted through resolutions. The goals are to reduce emissions by 25% and to produce 25% of its energy using sustainable sources. The project objectives were very definitive to assist the Tribe in achieving its goals; reducing carbon emissions and obtaining a sustainable source of energy. The following were the outlined objectives: (1) Coordinate LCO's current and future conservation and renewable energy projects; (2) Establish working relationships with outside entities to share information and collaborate on future projects; (3) Complete energy audit and analyze LCO's energy load and carbon emissions; (4) Identify policy changes, education programs and conservation efforts which are appropriate for the LCO Reservation; and (5) Create a plan to identify the most cost effective renewable energy options for LCO.

  15. An approach to the economic analysis of water supply projects

    OpenAIRE

    Lovei, Laszlo

    1992-01-01

    Development economists are increasingly concerned about the correct approach to economic analysis of projects. By looking for a compromise between theory (which identifies ideals) and practice (which deals within the bounds of time and resource constraints), Lovei focuses on potential guidelines for economic appraisals of water supply projects. He summarizes theory and the current World Bank guidelines on the economic analysis of water supply projects; reviews the method of economic analysis ...

  16. Web Based Distributed Coastal Image Analysis System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This project develops Web based distributed image analysis system processing the Moderate Resolution Imaging Spectroradiometer (MODIS) data to provide decision...

  17. Analysis of technology transfer in CDM projects: An update

    International Nuclear Information System (INIS)

    The clean development mechanism (CDM) contributes to technology transfer by financing emission reduction projects using technologies not available in the host countries. This paper provides the most comprehensive analysis of technology transfer in the CDM to-date, covering 3296 registered and proposed projects. Roughly 36% of the projects accounting for 59% of the annual emission reductions claim to involve technology transfer. Technology transfer is more common for larger projects and projects with foreign participants. Technology transfer is very heterogeneous across project types and usually involves both knowledge and equipment. As the number of projects increases, technology transfer occurs beyond the individual projects. This is observed for several of the most common project types in China and Brazil with the result that the rate of technology transfer for new projects in those countries has fallen significantly.

  18. Project management service delivery using competency analysis

    OpenAIRE

    Ogunsemi, Deji; Oyediran, Olukayode; Rotimi, James; Ekundayo, Damilola

    2008-01-01

    Deciding the most capable amongst the range of construction professional(s), by virtue of their knowledge, skills and abilities to offer project management services, has become topical in Nigeria. This study therefore undertakes a competency analyses approach to determine which of the construction professions has the greatest potential for project management service delivery. Questionnaire survey of project owners and constructors' opinions provided data for the analyses. These were analysed ...

  19. Analysis of Effectiveness Measures of Construction Project Success in Malaysia

    Directory of Open Access Journals (Sweden)

    Roshana Takim

    2009-02-01

    Full Text Available Project effectiveness measures are normally used by most researchers and practitioners to judge project performance and project success.  This paper provides an empirical analysis of measures of success in terms of effectiveness performance in the development of construction projects in Malaysia.  A survey was conducted in Malaysia among the four project stakeholders: the Government, private clients, consultants, and contractors.  In total 93 respondents completed the questionnaire. Lists of effectiveness of success measures were identified for the respondents to identify their level of success criticality to the Malaysian construction projects. The data were analysed by means of statistical analysis i.e. ranking of variables based on the mean values, Analysis of Variance (ANOVA and factor analysis techniques. The first finding revealed that the level of success criticality with regards to project efficiency performance in the development of construction projects in Malaysia is according to the specific requirements and priorities of different project stakeholders. The second finding shows that effectiveness measures are related to the project ‘results’ achieved in the development of construction project. These are represented by the five principal factors namely: Learning and Exploitation; Client Satisfaction; Stakeholder Objectives; Operational Assurance and User Satisfaction.  It is anticipated that the findings reported in this paper could be important for future strategies and guidelines for the development of projects in Malaysia.

  20. Linguistic Analysis of Project Ownership for Undergraduate Research Experiences

    Science.gov (United States)

    Hanauer, D. I.; Frederick, J.; Fotinakes, B.; Strobel, S. A.

    2012-01-01

    We used computational linguistic and content analyses to explore the concept of project ownership for undergraduate research. We used linguistic analysis of student interview data to develop a quantitative methodology for assessing project ownership and applied this method to measure degrees of project ownership expressed by students in relation…

  1. Graduate Student Project: Employer Operations Management Analysis

    Science.gov (United States)

    Fish, Lynn A.

    2008-01-01

    Part-time graduate students at an Association to Advance Collegiate Schools of Business-accredited college complete a unique project by applying operations management concepts to their current employer. More than 92% of 368 graduates indicated that this experiential project was a positive learning experience, and results show a positive impact on…

  2. PWR Core 2 Project accident analysis

    International Nuclear Information System (INIS)

    The various operations required for receipt, handling, defueling and storage of spent Shippingport PWR Core 2 fuel assemblies have been evaluated to determine the potential accidents and their consequences. These operations will introduce approximately 16,500 kilograms of depleted natural uranium (as UO2), 139 kilograms of plutonium, 2.8 megacuries of mixed fission products, and 14 kilograms of Zircaloy-4 (cladding and hardware) into the 221-T Canyon Building. Event sequences for potential accidents that were considered included (1) leaking fuel assemblies, (2) fire and explosion, (3) loss of coolant or cooling capability, (4) dropped and/or damaged fuel assemblies, and extrinsic occurrences such as loss of services, missile impact, and natural occurrences (e.g., earthquake, tornado). Accident frequencies were determined by formal analysis to be very low. Accident consequences are greatly mitigated by the safety and containment features designed into the fuel modules and shipping cask, the long cooling time since reactor discharge, and the redundant safety features designed into the facilities, equipment, and operating procedures for the PWR Core 2 Project. Possible hazards associated with the handling of these fuels have been considered and adequate safeguards and storage constraints identified. The operations of M-160 cask unloading and module storage will not involve identifiable risks as great or significantly greater than those for comparable licensed nuclear facilities, nor will hazards or risks be significantly different from comparable past 221-T Plant programs. Therefore, it is concluded that the operations required for receipt, handling, and defueling of the M-160 cask and for the storage and surveillance of the PWR Core 2 fuel assemblies at the 221-T Canyon Building can be performed without undue risk to the safety of the involved personnel, the public, the environment or the facility

  3. Project SAFE. Scenario and system analysis

    International Nuclear Information System (INIS)

    This report describes the scenario analysis conducted within the SAFE project, which has resulted in a qualitative description of the SFR disposal system. The scenario report generally documents and justifies the selected system description model, selected scenario initiating events and conditions, the general selection of the type of quantitative evaluation models to be used and the information flow between models. The development of a system description model is done by groups of experts through a series of documented meetings, utilising the Interaction Matrix methodology. This methodology involves a systematic identification of processes and interactions between these processes occurring in the system and documented expert judgements of the relevance of these processes and interactions for the evolution of the system. The SFR disposal system is described by three coupled matrices: one for the repository vaults, one for the geosphere and one for the biosphere. The contents of the matrices have been audited against different international lists of FEPs (Features, Events, Processes) in order to ensure that all FEPs that are relevant are considered in the matrices. These lists of FEPs as well as experiences from past and recent SKB assessments have also been used in the selection of scenario initiating events and conditions. The system description in terms of interaction matrices cannot directly be used in the quantitative assessment. However, the system description can be used to point out the important interactions and how they should be treated in the quantitative analyses and to check that this is done. For this purpose an information flow diagram has been used. This diagram graphically displays the information exchange between the different analyses selected for the quantitative assessment of the evolution of the disposal system

  4. An ABC analysis for power generation project

    Directory of Open Access Journals (Sweden)

    Batool Hasani

    2013-07-01

    Full Text Available One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC method helps reduce some of the unnecessary overhead cost items and increase on some other cost components. This helps increase the relative efficiency of the system by reducing total cost of project.

  5. WGM Resonators for Proteomic Analysis Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Due to the extensive amounts of data generated from the genome sequencing projects, the focus of genomics has shifted from elucidating DNA sequence to the...

  6. Status of NINJA: the Numerical INJection Analysis project

    CERN Document Server

    Aylott, Benjamin; Boggs, William D; Boyle, Michael; Brady, Patrick R; Brown, Duncan A; Brügmann, Bernd; Buchman, Luisa T; Buonanno, Alessandra; Cadonati, Laura; Camp, Jordan; Campanelli, Manuela; Centrella, Joan; Chatterjis, Shourov; Christensen, Nelson; Chu, Tony; Diener, Peter; Dorband, Nils; Etienne, Zachariah B; Faber, Joshua; Fairhurst, Stephen; Farr, Benjamin; Fischetti, Sebastian; Guidi, Gianluca; Goggin, Lisa M; Hannam, Mark; Herrmann, Frank; Hinder, Ian; Husa, Sascha; Kalogera, Vicky; Keppel, Drew; Kidder, Lawrence E; Kelly, Bernard J; Krishnan, Badri; Laguna, Pablo; Lousto, Carlos O; Mandel, Ilya; Marronetti, Pedro; Matzner, Richard; McWilliams, Sean T; Matthews, Keith D; Mercer, R Adam; Mohapatra, Satyanarayan R P; Mroué, Abdul H; Nakano, Hiroyuki; Ochsner, Evan; Pan, Yi; Pekowsky, Larne; Pfeiffer, Harald P; Pollney, Denis; Pretorius, Frans; Raymond, Vivien; Reisswig, Christian; Rezzolla, Luciano; Rinne, Oliver; Robinson, Craig; Röver, Christian; Santamaría, Lucía; Sathyaprakash, Bangalore; Scheel, Mark A; Schnetter, Erik; Seiler, Jennifer; Shapiro, Stuart L; Shoemaker, Deirdre; Sperhake, Ulrich; Stroeer, Alexander; Sturani, Riccardo; Tichy, Wolfgang; Liu, Yuk Tung; van der Sluys, Marc; van Meter, James R; Vaulin, Ruslan; Vecchio, Alberto; Veitch, John; Viceré, Andrea; Whelan, John T; Zlochower, Yosef; 10.1088/0264-9381/26/11/114008

    2009-01-01

    The 2008 NRDA conference introduced the Numerical INJection Analysis project (NINJA), a new collaborative effort between the numerical relativity community and the data analysis community. NINJA focuses on modeling and searching for gravitational wave signatures from the coalescence of binary system of compact objects. We review the scope of this collaboration and the components of the first NINJA project, where numerical relativity groups shared waveforms and data analysis teams applied various techniques to detect them when embedded in colored Gaussian noise.

  7. Project management assets and project management performance outcomes: Exploratory factor analysis

    OpenAIRE

    Gita Mathur; Kam Jugdev; Tak Shing Fung

    2013-01-01

    Purpose – The purpose of this paper is to examine characteristics of project management assets and project management performance outcomes as a step towards exploring the link between assets being valuable, rare, inimitable, and having organizational support and the achievement of competitive advantage. Design/methodology/approach – This paper analyzes data from responses to an online survey by 198 North American Project Management Institute® members. Exploratory factor analysis is used to id...

  8. Claim Analysis of Construction Projects in Oman

    Directory of Open Access Journals (Sweden)

    Mohammed Al Mohsin

    2012-01-01

    Full Text Available Claims are one of the problems that  construction project may face. Claims might cause many affects such as payment delay, extension of time and work suspension. This paper aims to highlight claims in construction industry in Oman and factors affecting these claims, as a result of construction boom, claims get bigger attention due to the high effect on the main elements of construction management. Field study has been conducted to collect data required in claim concern. Data were collected through data collecting form designed for this purpose, collected data was for 45 projects with specific criteria. According to the analyzed data, it’s been shown that the average of claims in construction projects is 2.6 claims per project, most of these claims are: extension of time effect, solved in negotiation manner, occurred in lump sum contracts. Owners are the first party "as sources of claims" with 42% of research sample over other sources like consultants, contractor and contract documents.

  9. Project characteristics, project management software utilization and project performance: an impact analysis based on real project data

    OpenAIRE

    Robert Pellerin; Nathalie Perrier; Xavier Guillot; Pierre-Majorique Léger

    2013-01-01

    Project management software packages are increasingly used by companies. These tools require a substantial financial investment, hence the importance of identifying the real contribution of project management software packages to the realization of projects. However, studies on the impacts of software packages on the performance of engineering project management are rare and mostly based on perceptions. The objective of this study is to investigate, from real project data, the level of utiliz...

  10. Fuzzy Complexity Analysis with Conflict Resolution for Educational Projects

    OpenAIRE

    Kouroush Jenab; Samir Khoury,; Ahmad Sarfaraz

    2012-01-01

    Evaluative and comparative analysis among educational projects remains an issue for administration, program directors, instructors, and educational institutes. This study reports a fuzzy complexity model for educational projects, which has two primary aspects (technical aspects and transparency aspects). These aspects may not be measured precisely due to uncertain situations. Therefore, a fuzzy graph-based model to measure the relative complexity of educational projects is presented that uses...

  11. Construction Project Success ranking through the Data Envelopment Analysis

    Directory of Open Access Journals (Sweden)

    Mazyar Zahedi-Seresht

    2014-09-01

    Full Text Available The purpose of this paper is to rank construction projects' success in a post delivery phase. To attain this objective, a data envelopment analysis (DEA approach is used. The model's output is a project success index which is calculated based on five project success criteria. These criteria which are determined by a two-round Delphi questionnaire survey are time performance, cost performance, quality, HSE, and customer satisfaction. The input factors which have effects on the output measures are Organizational Sponsorship, Project Manager Competency, Customer Organization, Project Operational Environment and Organizational Experience. The tool adopted to determine these factors is questionnaire. This model is applied for 9 projects with different importance of output and input factors and the reasonable result is achieved for ranking these projects.

  12. PERFORMANCE ANALYSIS OF PROJECTS IMPLEMENTATION IN HEIS

    Directory of Open Access Journals (Sweden)

    Sergiu-Vlad PETCU

    2015-04-01

    Full Text Available According to the European Commission, Romania is still facing significant mismatch between the skills of graduates of tertiary education and the market needs. This paper is highly relevant for the future implementation of HEIs, since they have a strong economic role and they can significantly influence long-term national social and economical development. Romania did not manage to materialize community funds allocated for the 2007-2013 programming period to its full potential. Accordingly, the proposed thesis intends to analyse how Romanian HEIs were able to manage community resources attracted by grants and how the implemented projects achieved their set objectives. According to the data collected so far, the results will show that the performance of the projects is directly dependent on the proportion of fully dedicated staff in organizational design of the project. The originality of the undertaken study is that it starts from a realistic approach, according to which the rules of the game should be adapted, depending on the players (in our case – HEIs.

  13. Cost-Benefit analysis of the chosen capital project

    OpenAIRE

    Havelka, Tomáš

    2011-01-01

    Cost-benefit analysis (CBA) is considered as well known and valuable analytical tool providing information for coherent decision making process. Project or policy is assessed through the procedures within CBA framework and decision makers make judgments whether undertake project or policy or not upon calculated socio economic indicators.

  14. Socio-Cultural Analysis in IDB Projects: A Discussion Paper

    OpenAIRE

    William L. Partridge; María Clara Mejía

    2013-01-01

    This paper presents the principal issues related to socio-cultural analyses carried out in conjunction with IDB operations as a tool for maximizing project benefits to poor and excluded groups and for ensuring compliance with many of the Bank's safeguard policies. A companion manual to this paper contains checklists for applying socio-cultural analysis in specific project areas.

  15. Convention Center Management: A Systems Analysis & Design Course Project

    Science.gov (United States)

    Guidry, Brandi N.; Totaro, Michael W.

    2011-01-01

    A challenge faced by many instructors of systems analysis and design courses is the selection or development of projects that provide challenging, yet suitable, learning experiences for the students. Employing a system development project case in undergraduate MIS courses offers students a multitude of opportunities to experientially examine…

  16. Project-Based Language Learning: An Activity Theory Analysis

    Science.gov (United States)

    Gibbes, Marina; Carson, Lorna

    2014-01-01

    This paper reports on an investigation of project-based language learning (PBLL) in a university language programme. Learner reflections of project work were analysed through Activity Theory, where tool-mediated activity is understood as the central unit of analysis for human interaction. Data were categorised according to the components of human…

  17. TV News Analysis Project Motivates Broadcast Class.

    Science.gov (United States)

    Smith, James R.

    1980-01-01

    Describes the use of content analysis by a journalism class in studying television news. Indicates that the method is flexible, generates familiarity with quantitative approaches to the analysis of broadcast journalism, can result in increased awareness of the complexity of the broadcast news medium, and increases student motivation. (TJ)

  18. Automation of Safety Analysis with SysML Models Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This project was a small proof-of-concept case study, generating SysML model information as a side effect of safety analysis. A prototype FMEA Assistant was...

  19. Project risk simulation methods – a comparative analysis

    OpenAIRE

    Constanța-Nicoleta BODEA; Augustin PURNUȘ

    2012-01-01

    Effective risk management provides a solid basis for decisionmaking in projects, bringing important benefits. While the financial and economical crisis is present at the global level and the competition in the market is more and more aggressive, the interest in project risk management increases. The paper presents a comparative analysis of the effectiveness of two quantitative risk analysis methods, Monte Carlo simulation and the Three Scenario approach. Two experiments are designed based on ...

  20. Quick Spacecraft Thermal Analysis Tool Project

    Data.gov (United States)

    National Aeronautics and Space Administration — For spacecraft design and development teams concerned with cost and schedule, the Quick Spacecraft Thermal Analysis Tool (QuickSTAT) is an innovative software suite...

  1. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  2. Workforce Planning of Navigation Software Project Based on Competence Analysis

    Directory of Open Access Journals (Sweden)

    Shangfei Xie

    2011-03-01

    Full Text Available This paper introduces the quantitative research method for the personnel configuration of the software project by studying the effects of the overall competence of the developers in the vehicle navigation software project on the factors like project quality. The study shows the overall competence of the developers is related to the after-submission defect density, productivity and the average delay of software Version 0.99. Further, a quantitative formula of competence and competence is drawn on the basis of statistics; meanwhile, according to the research result an integer programming configuration method for the navigation software project personnel based on competence analysis is concluded.

  3. EU Funded Projects: from Financial to Economic Analysis

    Directory of Open Access Journals (Sweden)

    Andreea Lorena RADU

    2011-06-01

    Full Text Available Investment projects represent the basis of economic and social development of our country. The investment is a cost that will most influence the future, but it is necessary that this influence should be not only positive, but also should exceed the investment efforts. There could be different sources of financing the investment, but lately, European grants are more and more accessed by various economic agents or institutions. To obtain European financing, the project must fulfill certain conditions and must follow certain economic, social and environmental indicators. Also, for some financing lines, is required the economic analysis preparation, in order to demonstrate that the project benefits to society are important and cover the investments efforts. Thus, economic analysis studies the project influence on macro-economic or regional level, and evaluates its contribution to the welfare of the region or local community. The present paper aims to analyze the most important and available theoretical resources and to provide practical examples for carrying out the economic analysis. In conclusion, economic analysis is an useful tool for each project evaluation, but the biggest barriers to its development are the lack of valid data and the reduced Romanian experience. Under these conditions, input data can be incorrectly estimated, resulting illusory and subjective project data. For a proper projects selection based on indicators of economic assessment, it must be developed a national, complete and complex guide.

  4. Analysis of Project Success Criteria in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Oluwaseun Sunday Dosumu

    2013-02-01

    Full Text Available This paper examined the relative importance of the project success criteria in the Nigerian construction industry. It also determined the correlation among the project success criteria. Based on the literatures reviewed, the study proposed a framework for measuring project success in the construction industry. The respondents for the study were the government, private clients, consultants and contractors. Three hundred copies of questionnaires were distributed to capture data on the subject, but only 86 were returned and used for the study. The paper captured respondents that are resident in Lagos state, Nigeria and chosen by convenience from selected organizations used for the study. The data were analysed with SPSS 16 through the use of frequencies, mean scores, factor analysis and correlation. Factor analysis was employed because the mean scores showed that all the project success criteria were at least important. Nine principal components were finally merged into 4 through the factor analysis using the Varimax rotation with Keiser normalization. The study found out that all the project success criteria were important but their level of importance differs according to the factor analysis carried out. Therefore, it was concluded that there are four major components of construction project success in Nigeria- user-related factors, professionals’ factors, organisational factors and other minor factors. The minor factors were found to be related to both organizations and projects but were not highly rated by respondents for determining construction project success. The study also concludes that project success criteria goes beyond meeting cost, time and quality target, it includes users’ satisfaction, professionals’ fulfilment and achievement of organizational goals. The recommendation of the study was that for construction projects to be successful, attention must be paid to users’ related factors, professionals’ factors and

  5. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  6. Analysis and control of issues that delay pharmaceutical projects

    Directory of Open Access Journals (Sweden)

    Nallam Sai Nandeswara Rao

    2015-10-01

    Full Text Available Every project will have certain objectives and service levels to be achieved. The success of a project depends on several dimensions like time, cost/budget, quality, etc. and managing a project involves completing the project within time, within budget and with quality to satisfy the users. Because of the significance of health, pharmaceutical companies realized the importance of project management methods and techniques to make available the life saving drugs in time to the needy patients and hospitals. In literature, there is meager information about pharmaceutical project management oriented towards analysis of issues and factors that contribute to the failure or success of projects. This study attempts to analyse different issues that contribute to time delays in pharmaceutical product-based projects, group them under a finite set of prominent factors and identify remedial measures to control those delays. The feedback of project people of some big pharmaceutical firms of Indian sub-continent was collected for this purpose. Exploratory factor analysis (EFA has been used to reduce the reasons for time delays to a limited number of prominent factors and the EFA model has been further examined by confirmatory factor analysis (CFA for its validation. Remedial measures under each factor of time delays have been gathered and a framework designed to mitigate the time delays in pharmaceutical projects. The derived factors that delay the pharmaceutical projects include resource, monitoring & control, scheduling and planning problems. Important remedial measures like blended resource approach, estimation and forecast of shortage of labour and skills, regular quality training, etc. have been recommended.

  7. Cost-Benefit Analysis for Investment Decisions: Chapter 7 (Principles Underlying The Economic Analysis of Projects)

    OpenAIRE

    Glenn Jenkins; Chun-Yan Kuo; Arnold C. Harberger

    2011-01-01

    While the financial analysis of a project focuses on matters of interest to investors, bankers, public sector budgets, etc., an economic analysis deals with the impact of the project on the entire society. The primary difference between the economic and financial evaluation is that the former aggregates benefits and costs over all the country's residents to determine whether the project improves the level of economic welfare of the country as a whole while the latter conside'rs the project fr...

  8. Projection and analysis of nuclear components

    International Nuclear Information System (INIS)

    The classification and the types of analysis carried out in pipings for quality control and safety of nuclear power plants, are presented. The operation and emergency conditions with emphasis of possible simplifications of calculations are described. (author/M.C.K.)

  9. Radiological release analysis for the EFR project

    International Nuclear Information System (INIS)

    Tile safety approach of the European Fast Reactor project (EFR) requires to deal with certain hypothetical CDA and therefore to enhance the containment structure in order to mitigate the consequences. The analyses are performed in order to design a containment taking advantages of die inherent characteristics of the liquid metal fast reactor. Adequate computer codes describing the sequences which follow the core disruptive accident, are used. One of the main tool is the computer code CONTAIN-LMR. The goal of these analyses is to identify the most sensitive phenomena such as the overpressure due to sodium fire, to assess the involvement of some design parameters such as the leaktightness of the structures, the arrangement of the ventilation system- the effects of the implementation of filters or a retention chamber. The results of the calculations allow to propose a robust containment for EFR, and to verify that the radiological releases in the environment can be limited. The paper presents the safety approach of EFR adopted with regard to the accidents leading to a radiological source term, and the main design options retained for the containment of EFR. Then, the methods used to describe the phenomena and some representative calculations, will be presented. The main useful information and knowledge which derive from these studies for the designers conclude the paper. (author)

  10. ADP Analysis project for the Human Resources Management Division

    Science.gov (United States)

    Tureman, Robert L., Jr.

    1993-01-01

    The ADP (Automated Data Processing) Analysis Project was conducted for the Human Resources Management Division (HRMD) of NASA's Langley Research Center. The three major areas of work in the project were computer support, automated inventory analysis, and an ADP study for the Division. The goal of the computer support work was to determine automation needs of Division personnel and help them solve computing problems. The goal of automated inventory analysis was to find a way to analyze installed software and usage on a Macintosh. Finally, the ADP functional systems study for the Division was designed to assess future HRMD needs concerning ADP organization and activities.

  11. Economic impact analysis of independent power projects in British Columbia

    International Nuclear Information System (INIS)

    Independent power producer (IPP) projects have been active in British Columbia's (BC) regulated electricity market since the late 1980s. The 49 IPP projects developed in the province currently account for approximately 10 per cent of BC's electricity generation, and IPP development continues to expand in nearly every region. This study presented an economic impact analysis of IPP projects in BC. The economic impacts of IPP projects were divided into 2 categories: (1) existing IPP projects, and (2) potential IPP projects. The study showed that the total power potential supplied by BC IPP projects would increase from a current level of 5940 annual GWh to approximately 14,149 GWh. BC could also be generating a further 21,321 GWh of annual output to service demand domestically in addition to exporting to the United States. The value of capital investment in existing IPPs across BC was estimated at $2.8 billion. Capital investment in potential IPPs was estimated at $26.1 billion in 2009 constant dollars. Government revenues generated through the construction phase of potential IPP projects were estimated at $1.6 billion. IPP projects are expected to have a significant impact on First Nations groups, contribute to provincial energy self-sufficiency, and have little to no greenhouse gas (GHG) emissions. 25 refs., 19 tabs., 24 figs.

  12. RISK ANALYSIS FOR SHIP CONVERTING PROJECT ACCOMPLISHMENT (Case study of KRI KP Converting Project

    Directory of Open Access Journals (Sweden)

    Dimas Endro W

    2013-10-01

    Full Text Available Ship converting has become as prospective activity in ship building area. Operational and economical aspect are the most dominant rationale. Baseon a new fuction of converted ship, a task list which contain several jobs that must be done is listed. This accomplishment schedule not only contain a task list, but also duration for certain job title. In practical apllication job duration is maintained based on experience of project manager.  Further more, total accomplish duration is setted as time accomplishment for the project. This setted time has become reference for the project bid. Occasionaly, if accomplishment time which offered is strict, than schedule slip become as potencial nightmare. For this situation, project manager has had a cristal clearconsideration to select a proper decision wheter he will take the tender offer or not. practically, project mananger has layed on his experience to handle previous project and face  penalty if the project delayed. This paper focussed on how to measure tender offer based on risk analysis, specially for converted ship tender which has a strike time accomplishment.A new application method to analysis proposed tender based on time and penalty parameter has become a topic of this paper.

  13. Risk Analysis in Construction Projects: A Practical Selection Methodology

    OpenAIRE

    Alberto De Marco; Muhammad Jamaluddin Thaheem

    2013-01-01

    Project Risk Management (PRM) is gaining attention from researchers and practitioners in the form of sophisticated tools and techniques to help construction managers perform risk management. However, the large variety of techniques has made selecting an appropriate solution a complex and risky task in itself. Accordingly, this study proposes a practical framework methodology to assist construction project managers and practitioners in choosing a suitable risk analysis technique based on selec...

  14. Supersymmetry Parameter Analysis: SPA Convention and Project

    Energy Technology Data Exchange (ETDEWEB)

    Hinchliffe, I.; et al.

    2005-05-05

    High-precision analyses of supersymmetry parameters aim atreconstructing the fundamental supersymmetric theory and its breakingmechanism. A well defined theoretical framework is needed whenhigher-order corrections are included. We propose such a scheme,Supersymmetry Parameter Analysis SPA, based on a consistent set ofconventions and input parameters. A repository for computer programs isprovided which connect parameters in different schemes and relate theLagrangian parameters to physical observables at LHC and high energy e+e-linear collider experiments, i.e., masses, mixings, decay widths andproduction cross sections for supersymmetric particles. In addition,programs for calculating high-precision low energy observables, thedensity of cold dark matter (CDM) in the universe as well as the crosssections for CDM search experiments are included. The SPA scheme stillrequires extended efforts on both the theoretical and experimental sidebefore data can be evaluated in the future at the level of the desiredprecision. We take here an initial step of testing the SPA scheme byapplying the techniques involved to a specific supersymmetry referencepoint.

  15. An analysis of project finance - a project example: Construction of the apartment complex Metuljček in Kamnik

    OpenAIRE

    Zagožen, Urška

    2007-01-01

    Bachelor thesis deals with technique of project financing of real estate projects and other financially extensive projects. Theoretical and practical analysis of project financing has been done on a practical case study. We defined the term project financing, criteria for project financing, participants, basic steps, risks and their distribution among the participants. We described a detailed view of factors that have a direct or indirect impact on the financial overview of an ...

  16. SUCCESS CONCEPT ANALYSIS APPLIED TO THE INFORMATION TECHNOLOGY PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cassio C. Montenegro Duarte

    2012-05-01

    Full Text Available This study evaluates the concept of success in project management that is applicable to the IT universe, from the classical theory associated with the techniques of project management. Therefore, it applies the theoretical analysis associated to the context of information technology in enterprises as well as the classic literature of traditional project management, focusing on its application in business information technology. From the literature developed in the first part of the study, four propositions were prepared for study which formed the basis for the development of the field research with three large companies that develop projects of Information Technology. The methodology used in the study predicted the development of the multiple case study. Empirical evidence suggests that the concept of success found in the classical literature in project management adjusts to the environment management of IT projects. Showed that it is possible to create the model of standard IT projects in order to replicate it in future derivatives projects, which depends on the learning acquired at the end of a long and continuous process and sponsorship of senior management, which ultimately results in its merger into the company culture.

  17. Economic analysis of projects of small hydro power stations

    International Nuclear Information System (INIS)

    By definition, economic analysis compares all benefits and costs associated with a project during its useful life. Costs include initial and recurring annual expenditures, whereas the benefits include revenues from the sale of electricity. Economic analysis of small hydro projects usually provides the basis for the final decision on whether or not to proceed with such investment. In general, the method used in the article includes the pay-back, the benefit/cost ratio, the net present value, the internal rate of return. (author). 7 tabs., 2 refs

  18. Comparative analysis of student self-reflections on course projects

    Science.gov (United States)

    Pomales-García, Cristina; Cortés Barreto, Kenneth

    2014-11-01

    This study presents the skills, experiences, and values identified in project self-reflections of 161 undergraduate engineering students. Self-reflections from two different engineering design courses, which provide experiences in project-based learning (PBL), are analysed through the content analysis methodology. Results show that 'application', 'true life', 'satisfaction', and 'communication' are the common keywords shared in the reflections. Multiple hypothesis tests to identify differences between courses, project types, years, and gender suggest that there are no significant differences between experiences, skills, and values self-reported by students who completed either a case study or an industry project. Based on research findings, recommendations will be provided to enhance the engineering curriculum based on PBL experiences to support the development of relevant professional skills and experiences.

  19. A sustainability analysis of the Brazilian multipurpose reactor project

    International Nuclear Information System (INIS)

    The project of a new research reactor in Brazil for radioisotope production, support of the nuclear energy program and scientific research has received a positive sign of the government and is starting to be developed by the Brazilian Commission of Nuclear Energy. International Atomic Energy Agency points out that the implementation of a new research reactor is a major undertaking for a country, requiring an analysis to identify to which extent the conditions of the national nuclear program are proper and adequate to lead to a sustainable research reactor life cycle. This paper introduces the Brazilian Multipurpose Reactor Project (RMB) and describes the sustainability analysis performed, which has shown that the national nuclear infrastructure presents a very favourable condition to the implementation of the RMB project as well as to provide a sustainable life cycle for this new research reactor. (author)

  20. Assessment of Transport Projects: Risk Analysis and Decision Support

    DEFF Research Database (Denmark)

    Salling, Kim Bang

    2008-01-01

    The subject of this thesis is risk analysis and decision support in the context of transport infrastructure assessment. During my research I have observed a tendency in studies of assessing transport projects of overlooking the substantial amount of uncertainties within the decision making process...... Monte Carlo simulation, being the technique behind the quantitative risk analysis of CBA-DK. The informed decision support is dealt with by a set of resulting accumulated descending graphs (ADG) which makes it possible for decision-makers to come to terms with their risk aversion given a specific...... transport projects, namely by moving from point estimates to interval results. The main focus of this Ph.D. study has been to develop a valid, flexible and functional decision support tool in which risk oriented aspects of project evaluation is implemented. Throughout the study six papers have been produced...

  1. Retrospective economic and financial analysis of the Laguna Verde Project

    International Nuclear Information System (INIS)

    The objective of this paper is to show, from an economic and financial point of view, the effects of the capital expenditure programme of the Laguna Verde Nuclear Power Plant Project on costs in terms of investment per kWh generated. An economic and a financial analysis are therefore included. Various investment periods and balanced costs are considered

  2. Managing Software Project Risks (Analysis Phase) with Proposed Fuzzy Regression Analysis Modelling Techniques with Fuzzy Concepts

    OpenAIRE

    Elzamly, Abdelrafe; Hussin, Burairah

    2014-01-01

    The aim of this paper is to propose new mining techniques by which we can study the impact of different risk management techniques and different software risk factors on software analysis development projects. The new mining technique uses the fuzzy multiple regression analysis techniques with fuzzy concepts to manage the software risks in a software project and mitigating risk with software process improvement. Top ten software risk factors in analysis phase and thirty risk management techni...

  3. Plutonium Finishing Plant Transition Project mission analysis report

    International Nuclear Information System (INIS)

    This report defines the mission for the Plutonium Finishing Plant Transition Project (PFPTP) using a systems engineering approach. This mission analysis will be the basis for the functional analysis which will further define and break down the mission statement into all of the detailed functions required to accomplish the mission. The functional analysis is then used to develop requirements, allocate those requirements to functions, and eventually be used to design the system. This report: presents the problem which will be addressed, defines PFP Transition Project, defines the overall mission statement, describes the existing, initial conditions, defines the desired, final conditions, identifies the mission boundaries and external interfaces, identifies the resources required to carry out the mission, describes the uncertainties and risks, and discusses the measures which will be used to determine success

  4. Risk analysis for renewable energy projects due to constraints arising

    Science.gov (United States)

    Prostean, G.; Vasar, C.; Prostean, O.; Vartosu, A.

    2016-02-01

    Starting from the target of the European Union (EU) to use renewable energy in the area that aims a binding target of 20% renewable energy in final energy consumption by 2020, this article illustrates the identification of risks for implementation of wind energy projects in Romania, which could lead to complex technical implications, social and administrative. In specific projects analyzed in this paper were identified critical bottlenecks in the future wind power supply chain and reasonable time periods that may arise. Renewable energy technologies have to face a number of constraints that delayed scaling-up their production process, their transport process, the equipment reliability, etc. so implementing these types of projects requiring complex specialized team, the coordination of which also involve specific risks. The research team applied an analytical risk approach to identify major risks encountered within a wind farm project developed in Romania in isolated regions with different particularities, configured for different geographical areas (hill and mountain locations in Romania). Identification of major risks was based on the conceptual model set up for the entire project implementation process. Throughout this conceptual model there were identified specific constraints of such process. Integration risks were examined by an empirical study based on the method HAZOP (Hazard and Operability). The discussion describes the analysis of our results implementation context of renewable energy projects in Romania and creates a framework for assessing energy supply to any entity from renewable sources.

  5. The CAVES Project - Exploring Virtual Data Concepts for Data Analysis

    CERN Document Server

    Bourilkov, D

    2004-01-01

    The Collaborative Analysis Versioning Environment System (CAVES) project concentrates on the interactions between users performing data and/or computing intensive analyses on large data sets, as encountered in many contemporary scientific disciplines. In modern science increasingly larger groups of researchers collaborate on a given topic over extended periods of time. The logging and sharing of knowledge about how analyses are performed or how results are obtained is important throughout the lifetime of a project. Here is where virtual data concepts play a major role. The ability to seamlessly log, exchange and reproduce results and the methods, algorithms and computer programs used in obtaining them enhances in a qualitative way the level of collaboration in a group or between groups in larger organizations. The CAVES project takes a pragmatic approach in assessing the needs of a community of scientists by building series of prototypes with increasing sophistication. In extending the functionality of existi...

  6. UMTRA project water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site

  7. The physics analysis tools project for the ATLAS experiment

    International Nuclear Information System (INIS)

    The Large Hadron Collider is expected to start colliding proton beams in 2009. The enormous amount of data produced by the ATLAS experiment (≅1 PB per year) will be used in searches for the Higgs boson and Physics beyond the standard model. In order to meet this challenge, a suite of common Physics Analysis Tools has been developed as part of the Physics Analysis software project. These tools run within the ATLAS software framework, ATHENA, covering a wide range of applications. There are tools responsible for event selection based on analysed data and detector quality information, tools responsible for specific physics analysis operations including data quality monitoring and physics validation, and complete analysis tool-kits (frameworks) with the goal to aid the physicist to perform his analysis hiding the details of the ATHENA framework. (authors)

  8. Severe accident analysis code SAMPSON improvement for IMPACT project

    International Nuclear Information System (INIS)

    SAMPSON is the integral code for severe accident analysis in detail with modular structure, developed in the IMPACT project. Each module can run independently and communications with multiple analysis modules supervised by the analysis control module makes an integral analysis possible. At the end of Phase 1 (1994-1997), demonstration simulation by combinations of up to 11 analysis modules had been performed and physical models in the code had been verified by separate-effect tests and validated by integral tests. Multi-dimensional mechanistic models and theoretical-based conservation equations have been applied, during Phase 2 (1998 - 2000). New models for Accident Management evaluation have been also developed. Verification and validation have been performed by analysing separate-effect tests and integral tests, while actual plant analyses are also being in progress. (author)

  9. Analysis of virtual communities supporting OSS projects using social network analysis

    OpenAIRE

    S. L. Toral; Martínez Torres, María del Rocío; Barrero, Federico

    2010-01-01

    This paper analyses the behaviour of virtual communities for Open Source Software (OSS) projects. The development of OSS projects relies on virtual communities, which are built on relationships among members, being their final objective sharing knowledge and improving the underlying project. This study addresses the interactive collaboration in these kinds of communities applying social network analysis (SNA). In particular, SNA techniques will be used to identify those members pl...

  10. Bayesian-network-based safety risk analysis in construction projects

    International Nuclear Information System (INIS)

    This paper presents a systemic decision support approach for safety risk analysis under uncertainty in tunnel construction. Fuzzy Bayesian Networks (FBN) is used to investigate causal relationships between tunnel-induced damage and its influential variables based upon the risk/hazard mechanism analysis. Aiming to overcome limitations on the current probability estimation, an expert confidence indicator is proposed to ensure the reliability of the surveyed data for fuzzy probability assessment of basic risk factors. A detailed fuzzy-based inference procedure is developed, which has a capacity of implementing deductive reasoning, sensitivity analysis and abductive reasoning. The “3σ criterion” is adopted to calculate the characteristic values of a triangular fuzzy number in the probability fuzzification process, and the α-weighted valuation method is adopted for defuzzification. The construction safety analysis progress is extended to the entire life cycle of risk-prone events, including the pre-accident, during-construction continuous and post-accident control. A typical hazard concerning the tunnel leakage in the construction of Wuhan Yangtze Metro Tunnel in China is presented as a case study, in order to verify the applicability of the proposed approach. The results demonstrate the feasibility of the proposed approach and its application potential. A comparison of advantages and disadvantages between FBN and fuzzy fault tree analysis (FFTA) as risk analysis tools is also conducted. The proposed approach can be used to provide guidelines for safety analysis and management in construction projects, and thus increase the likelihood of a successful project in a complex environment. - Highlights: • A systemic Bayesian network based approach for safety risk analysis is developed. • An expert confidence indicator for probability fuzzification is proposed. • Safety risk analysis progress is extended to entire life cycle of risk-prone events. • A typical

  11. Analysis of registered CDM projects: potential removal of evidenced bottlenecks

    Energy Technology Data Exchange (ETDEWEB)

    Agosto, D.; Bombard, P.; Gostinelli, F.

    2007-07-01

    The Clean Development Mechanism (CDM) has developed during its first period of implementation, a distinctive set of patterns. The authors thought of concentrating on the CDM analysis in order to highlight potential remedies or reasons for given bottlenecks. In order to establish a sort of extensive SWOT analysis for CDMs, all the 356 projects actually (November 2006) registered at UNFCCC were examined, together with all the about 1000 PDDs presented to the UNFCCC but not registered yet. The CDM projects have been studied trying to cluster projects according to relevant characteristics, both from a technical and an economic point of view. Chosen indicators are meant to identify: more convenient/more diffused energy system for a CDM; reasons for a geographical distribution of different types of projects; potentials for a future exploitation of lower used technologies in CDM. Conclusions are drawn and appropriate tables and graphs presented. (1) the Baseline Emission Factor, combined to economic patterns, is the pivotal factor that characterizes both choices of host country and technology; (2) some technologies can exploit appropriately CDM scheme, whilst other technologies, are constrained by it. (3) there are still some important weak points: grouping of non Annex I countries; crediting period; criteria for the evaluation of sustainable development. (auth)

  12. Detailed analysis of radon flux studies at Australian uranium projects

    International Nuclear Information System (INIS)

    The release of radon gas and radon progeny from uranium projects is a major issue during operation as well as for the design of rehabilitation works. In Australia, there have been a number of premining radon flux studies as part of the environmental investigation and potential development of recent uranium projects. There is also an increasing amount of operational data on radon fluxes and loads from various aspects of projects, such as tailings, waste rock and mills. Thus there exists much useful measured data which can be used to assess the design radon flux and load targets for rehabilitation. The main projects for which radon data exists includes Ranger, Olympic Dam, Beverley, Honeymoon, Jabiluka, Yeelirrie, Lake Way, Koongarra, Moline, Coronation Hill, Rockhole, Nabarlek, Rum Jungle, Port Pirie and Ben Lomond. To date, much of this data has not been systematically evaluated. The need to compile and assess this data is twofold. Firstly, to assess the loads released from uranium production as an input into life-cycle analyses of the nuclear fuel cycle, such as those undertaken by UNSCEAR and industry groups. Secondly, there is a need to set suitable design standards for radon flux for the rehabilitation of former and current uranium projects. This paper will present such a detailed compilation of radon fluxes and loads which can then be used as the basis for both life-cycle analyses as well as setting appropriate site-specific rehabilitation criteria for radon. The implications for former and current projects is then discussed as well as future data needs. Ultimately, there is a critical need for thorough baseline surveys prior to mining to ensure accurate assessments of changes to radon fluxes and loads. The data and analysis presented is considered applicable to all uranium projects in Australia, as well as being a useful model for considering such issues internationally

  13. The ALMA assembly, integration, and verification project: a retrospective analysis

    Science.gov (United States)

    Lopez, B.; Knee, L. B. G.; Jager, H.; Whyborn, N.; McMullin, J.; Murowinski, R.; Peck, A.; Corder, S.

    2014-08-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Assembly, Integration, and Verification (AIV) of the antennas was completed at the end of the year 2013, while the final optimization and complete expansion to validate all planned observing modes will continue. This paper compares the actually obtained results of the period 2008-2013 with the baselines that had been laid out in the early project-planning phase (2005-2007). First plans made for ALMA AIV had already established a two-phased project life-cycle: phase 1 for setting up necessary infrastructure and common facilities, and taking the first three antennas to the start of commissioning; and phase 2 focused on the steady state processing of the remaining units. Throughout the execution of the project this lifecycle was refined and two additional phases were added, namely a transition phase between phases 1 and 2, and a closing phase to address the project ramp-down. A sub-project called Accelerated Commissioning and Science Verification (ACSV) was carried out during the year 2009 in order to provide focus to the whole ALMA organization, and to accomplish the start-of-commissioning milestone. Early phases of CSV focused on validating the basic performance and calibration. Over time additional observing modes have been validated as capabilities expanded both in hardware and software. This retrospective analysis describes the originally presented project staffing plans and schedules, the underlying assumptions, identified risks and operational models, among others. For comparison actual data on staffing levels, the resultant schedule, additional risks identified and those that actually materialized, are presented. The

  14. Data analysis and management for the Uranium Resource Evaluation Project

    International Nuclear Information System (INIS)

    The Department of Energy has funded a large data collection effort with the purpose of determining the US uranium resources. This Uranium Resource Evaluation (URE) Project required a large data management effort which involved collection, retrieval, processing, display, and analysis of large volumes of data. Many of the characteristics of this data processing system are relevant to other applications, particularly where routine processing involves analyses for input into numerous technical reports. The URE Project computing system has a modular program structure which has enabled a straightforward interface with both special and general graphics and analysis packages such as SAS, BMDP, and SURFACE II. Other topics include cost-effective computing, data quality, report quality computer output, and test versus production program development

  15. A DST-based approach for construction project risk analysis

    OpenAIRE

    Taroun, A; J-B Yang

    2013-01-01

    Despite its huge potential in risk analysis, the Dempster–Shafer Theory of Evidence (DST) has not received enough attention in construction management. This paper presents a DST-based approach for structuring personal experience and professional judgment when assessing construction project risk. DST was innovatively used to tackle the problem of lacking sufficient information through enabling analysts to provide incomplete assessments. Risk cost is used as a common scale for measuring risk im...

  16. Analysis and dynamics on the Berkovich projective line

    OpenAIRE

    Rumely, Robert; Baker, Matthew

    2004-01-01

    This is a set of expanded lecture notes from the Berkovich Space seminar held at the University of Georgia during Spring, 2004. The purpose of the notes is to provide a non-technical introduction to Berkovich spaces, and to develop the foundations for analysis on the Berkovich projective line, with a view toward applications in dynamics. After describing the underlying topological space and the sheaf of functions on the Berkovich line, we introduce the Hsia kernel, the fundamental kernel for ...

  17. A Economic Analysis of the Akkar Plain Project

    OpenAIRE

    Chard, E. Douglas

    1981-01-01

    The purpose of this paper is to determine the economic feasibility of the Akkar Plain Agricultural Development Project. Data were collected at representative villages throughout the Akkar Plain in Syria. The data were used to establish the economic setting at the present time on the Akkar Plain and to establish a basis for determining the economic justification for the future planned developments. Methodology used was a farm budget analysis of a before development and after development situat...

  18. The CAVES Project - Exploring Virtual Data Concepts for Data Analysis

    OpenAIRE

    Bourilkov, Dimitri

    2004-01-01

    The Collaborative Analysis Versioning Environment System (CAVES) project concentrates on the interactions between users performing data and/or computing intensive analyses on large data sets, as encountered in many contemporary scientific disciplines. In modern science increasingly larger groups of researchers collaborate on a given topic over extended periods of time. The logging and sharing of knowledge about how analyses are performed or how results are obtained is important throughout the...

  19. SNF fuel retrieval sub project safety analysis document

    International Nuclear Information System (INIS)

    This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed

  20. SNF fuel retrieval sub project safety analysis document

    Energy Technology Data Exchange (ETDEWEB)

    BERGMANN, D.W.

    1999-02-24

    This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed.

  1. Severe accident analysis code Sampson for impact project

    Energy Technology Data Exchange (ETDEWEB)

    Hiroshi, Ujita; Takashi, Ikeda; Masanori, Naitoh [Nuclear Power Engineering Corporation, Advanced Simulation Systems Dept., Tokyo (Japan)

    2001-07-01

    Four years of the IMPACT project Phase 1 (1994-1997) had been completed with financial sponsorship from the Japanese government's Ministry of Economy, Trade and Industry. At the end of the phase, demonstration simulations by combinations of up to 11 analysis modules developed for severe accident analysis in the SAMPSON Code were performed and physical models in the code were verified. The SAMPSON prototype was validated by TMI-2 and Phebus-FP test analyses. Many of empirical correlation and conventional models have been replaced by mechanistic models during Phase 2 (1998-2000). New models for Accident Management evaluation have been also developed. (author)

  2. Severe accident analysis code Sampson for impact project

    International Nuclear Information System (INIS)

    Four years of the IMPACT project Phase 1 (1994-1997) had been completed with financial sponsorship from the Japanese government's Ministry of Economy, Trade and Industry. At the end of the phase, demonstration simulations by combinations of up to 11 analysis modules developed for severe accident analysis in the SAMPSON Code were performed and physical models in the code were verified. The SAMPSON prototype was validated by TMI-2 and Phebus-FP test analyses. Many of empirical correlation and conventional models have been replaced by mechanistic models during Phase 2 (1998-2000). New models for Accident Management evaluation have been also developed. (author)

  3. Best Estimate Analysis Methodology in the STARS Project at PSI

    International Nuclear Information System (INIS)

    The Project performed Best Estimate deterministic safety assessment of the Swiss nuclear power plants on behalf of the Swiss nuclear safety authority (HSK) and the utilities. The overall goal was to provide independent expertise in deterministic safety analysis to HSK and the utilities: - identification and quantification of safety margins in existing Swiss nuclear power plants, - technical input for safety related decisions based on timely and independent analysis. It described the tools and the philosophy of Best Estimate analysis in the STARS Project, the code development model and its assessment, code assessment and code applications. PSI had concluded that Best Estimate codes should be able to handle a wide variety of different transients, operational or unanticipated, in a numerically robust way, with a minimum of manipulation of qualified plant models. Validation and assessment of the adequacy of code models for the intended application was essential to justify the results of any Best Estimate analysis. This could be helped by: - easy access to relevant experimental data: a central, extensive data base (Separate Effects and Integral Test data) would help substantially; - easy access to plant data: these are essential for qualifying plant and code models; - assessment against experimental data, as it provides very valuable information for uncertainty methodologies. The application of uncertainty analysis to Best Estimate results is becoming important for decision-making, e.g. licensing, plant operation and configuration changes, etc

  4. Project development and commercialization of on-line analysis systems

    International Nuclear Information System (INIS)

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems are licensed to Australian companies, Amdel Ltd and Mineral Control Instrumentation Ltd. Both systems are used by industry worldwide, and are the market leaders for radioisotope gauges in their application field. The third system, the multiphase flow meter, was licensed in 1997 to Kvaerner FSSL Ltd of Aberdeen. This meter has even greater potential than the other two systems for economic benefit from its used and for numbers of installations. The on-line analysis systems have been developed to increase the productivity of the Australian mineral and energy industries, and to provide economic benefit to Australia. The economic benefit sought is predominantly improved process control based on use of the instrument, rather than from its sale. Sales of instruments are significant, however, with about A$80 million from the analysis systems and their derivatives since the 1970s. Some of the issues associated with the development of the on-line analysis system are outlined

  5. The EVEREST project: sensitivity analysis of geological disposal systems

    International Nuclear Information System (INIS)

    The main objective of the EVEREST project is the evaluation of the sensitivity of the radiological consequences associated with the geological disposal of radioactive waste to the different elements in the performance assessment. Three types of geological host formations are considered: clay, granite and salt. The sensitivity studies that have been carried out can be partitioned into three categories according to the type of uncertainty taken into account: uncertainty in the model parameters, uncertainty in the conceptual models and uncertainty in the considered scenarios. Deterministic as well as stochastic calculational approaches have been applied for the sensitivity analyses. For the analysis of the sensitivity to parameter values, the reference technique, which has been applied in many evaluations, is stochastic and consists of a Monte Carlo simulation followed by a linear regression. For the analysis of conceptual model uncertainty, deterministic and stochastic approaches have been used. For the analysis of uncertainty in the considered scenarios, mainly deterministic approaches have been applied

  6. Structure analysis of super-FRS dipoles for FAIR project

    International Nuclear Information System (INIS)

    The super fragment separator(super-FRS) of the FAIR project(facility for antiproton and ion research) consists of two superconducting coils. The maximum magnetic field is as high as 1.6 T, which results in large magnetic force. In order to assure the mechanical stability of the superconducting magnet, we conducted a 3D finite element analysis of its mechanical behavior.For numerical simulation and analysis of the phenomena inside the structure, the ADINA and TOSCA codes were chosen. The ADINA code is commonly used for numerical simulations of the structure analysis and the TOSCA code is professional software to calculate the magnetic field and Lorentz Forces. The results show that for the coil case is made of 316LN stainless steel cast, the structure with iron core and fixers in the middle of the long sides is reasonable with the maximal displacement of about 0.19 mm and the maximal effective stress of about 92 MPa. (authors)

  7. Results of the probabilistic volcanic hazard analysis project

    International Nuclear Information System (INIS)

    The Probabilistic Volcanic Hazard Analysis (PVHA) project, sponsored by the U.S. Department of Energy (DOE), has been conducted to assess the probability of a future volcanic event disrupting the potential repository at Yucca Mountain. The methodology for the PVHA project is summarized in Coppersmith and others (this volume). The judgments of ten earth scientists who were members of an expert panel were elicited to ensure that a wide range of approaches were considered. Each expert identified one or more approaches for assessing the hazard and they quantified their uncertainties in models and parameter values. Aggregated results are expressed as a probability distribution on the annual frequency of intersecting the proposed repository block. This paper presents some of the key results of the PVHA assessments. These results are preliminary; the final report for the study is planned to be submitted to DOE in April 1996

  8. UMTRA project water sampling and analysis plan, Maybell, Colorado

    International Nuclear Information System (INIS)

    This water sampling and analysis plan (WSAP) describes planned water sampling activities and provides the regulatory and technical basis for ground water sampling in 1994 at the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Maybell, Colorado. The WSAP identifies and justifies sampling locations, analytical parameters, and sampling frequencies at the site. The ground water data will be used for site characterization and risk assessment. The regulatory basis for the ground water and surface water monitoring activities is derived from the EPA regulations in 40 CFR Part 192 (1993) and the proposed EPA standards of 1987 (52 FR 36000). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. This WSAP also includes a summary and the results of water sampling activities from 1989 through 1992 (no sampling was performed in 1993)

  9. 100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT

    Energy Technology Data Exchange (ETDEWEB)

    HARRINGTON RA

    2010-01-15

    On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, to all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project delivery

  10. Cost-Benefit Analysis for Investment Decisions: Chapter 3 (The Financial Appraisal of Projects)

    OpenAIRE

    Glenn Jenkins; Chun-Yan Kuo; Arnold C. Harberger

    2011-01-01

    The financial analysis of a project helps determine the financial viability and sustainability of the project. Since the integrated project analysis begins with the financial analysis and then the economic analysis, the concepts and data ought to be organized in a consequential and consistent manner. The comparison of either financial or economic benefits with their corresponding costs requires that all relevant data should be organized into a project profile covering the duration of the proj...

  11. Accident consequence calculations for project W-058 safety analysis

    International Nuclear Information System (INIS)

    This document describes the calculations performed to determine the accident consequences for the W-058 safety analysis. Project W-058 is the replacement cross site transfer system (RCSTS), which is designed to transort liquid waste between the 200 W and 200 E areas. Calculations for RCSTS safety analyses used the same methods as the calculations for the Tank Waste Remediation System (TWRS) Basis for Interim Operation (BIO) and its supporting calculation notes. Revised analyses were performed for the spray and pool leak accidents since the RCSTS flows and pressures differ from those assumed in the TWRS BIO. Revision 1 of the document incorporates review comments

  12. Cost-benefit analysis for gas infrastructure projects

    OpenAIRE

    Keyaerts, Nico; Glachant, Jean-Michel

    2014-01-01

    QM-AI-14-003-EN-C QM-AI-14-003-EN-N • To reinvigorate the building of new gas infrastructure in Europe, the Euro­pean Union has introduced ‘projects of common interest’ (PCI) in its Energy Infrastructure Package. These PCIs will be evaluated and selected on the basis of systematic cost-benefit analysis (CBA), a method that is novel for the Euro­pean gas industry. A consistent gas-CBA method has to be designed by ENT­SOG, who published a preliminary draft method for public consultation o...

  13. Analysis of recent projections of electric power demand

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, Jr, D V

    1993-08-01

    This report reviews the changes and potential changes in the outlook for electric power demand since the publication of Review and Analysis of Electricity Supply Market Projections (B. Swezey, SERI/MR-360-3322, National Renewable Energy Laboratory). Forecasts of the following organizations were reviewed: DOE/Energy Information Administration, DOE/Policy Office, DRI/McGraw-Hill, North American Electric Reliability Council, and Gas Research Institute. Supply uncertainty was briefly reviewed to place the uncertainties of the demand outlook in perspective. Also discussed were opportunities for modular technologies, such as renewable energy technologies, to fill a potential gap in energy demand and supply.

  14. Stress analysis of HLW containers advanced test work Compas project

    International Nuclear Information System (INIS)

    The Compas project is concerned with the structural performance of metal overpacks which may be used to encapsulate vitrified high-level waste forms before disposal in deep geological repositories. This document describes the activities performed between June and August 1989 forming the advanced test work phase of this project. This is the culmination of two years' analysis and test work to demonstrate whether the analytical ability exists to model containers subjected to realistic loads. Three mild steel containers were designed and manufactured to be one-third scale models of a realistic HLW container, modified to represent the effect of anisotropic loading and to facilitate testing. The containers were tested under a uniform external pressure and all failed by buckling in the mid-body region. The outer surface of each container was comprehensively strain-gauged to provide strain history data at all positions of interest. In parallel with the test work, Compas project partners, from five different European countries, independently modelled the behaviour of each of the containers using their computer codes to predict the failure pressure and produce strain history data at a number of specified locations. The first axisymmetric container was well modelled but predictions for the remaining two non-axisymmetric containers were much more varied, with differences of up to 50% occurring between failure predictions and test data

  15. UMTRA project water sampling and analysis plan, Monument Valley, Arizona

    International Nuclear Information System (INIS)

    The Monument Valley Uranium Mill Tailings Remedial Action (UMTRA) Project site in Cane Valley is a former uranium mill that has undergone surface remediation in the form of tailings and contaminated materials removal. Contaminated materials from the Monument Valley (Arizona) UMTRA Project site have been transported to the Mexican Hat (Utah) UMTRA Project site for consolidation with the Mexican Hat tailings. Tailings removal was completed in February 1994. Three geologic units at the site contain water: the unconsolidated eolian and alluvial deposits (alluvial aquifer), the Shinarump Conglomerate (Shinarump Member), and the De Chelly Sandstone. Water quality analyses indicate the contaminant plume has migrated north of the site and is mainly in the alluvial aquifer. An upward hydraulic gradient in the De Chelly Sandstone provides some protection to that aquifer. This water sampling and analysis plan recommends sampling domestic wells, monitor wells, and surface water in April and September 1994. The purpose of sampling is to continue periodic monitoring for the surface program, evaluate changes to water quality for site characterization, and provide data for the baseline risk assessment. Samples taken in April will be representative of high ground water levels and samples taken in September will be representative of low ground water levels. Filtered and nonfiltered samples will be analyzed for plume indicator parameters and baseline risk assessment parameters

  16. Project X: competitive intelligence data mining and analysis

    Science.gov (United States)

    Gilmore, John F.; Pagels, Michael A.; Palk, Justin

    2001-03-01

    Competitive Intelligence (CI) is a systematic and ethical program for gathering and analyzing information about your competitors' activities and general business trends to further your own company's goals. CI allows companies to gather extensive information on their competitors and to analyze what the competition is doing in order to maintain or gain a competitive edge. In commercial business this potentially translates into millions of dollars in annual savings or losses. The Internet provides an overwhelming portal of information for CI analysis. The problem is how a company can automate the translation of voluminous information into valuable and actionable knowledge. This paper describes Project X, an agent-based data mining system specifically developed for extracting and analyzing competitive information from the Internet. Project X gathers CI information from a variety of sources including online newspapers, corporate websites, industry sector reporting sites, speech archiving sites, video news casts, stock news sites, weather sites, and rumor sites. It uses individual industry specific (e.g., pharmaceutical, financial, aerospace, etc.) commercial sector ontologies to form the knowledge filtering and discovery structures/content required to filter and identify valuable competitive knowledge. Project X is described in detail and an example competitive intelligence case is shown demonstrating the system's performance and utility for business intelligence.

  17. Sparse Regression by Projection and Sparse Discriminant Analysis

    KAUST Repository

    Qi, Xin

    2015-04-03

    © 2015, © American Statistical Association, Institute of Mathematical Statistics, and Interface Foundation of North America. Recent years have seen active developments of various penalized regression methods, such as LASSO and elastic net, to analyze high-dimensional data. In these approaches, the direction and length of the regression coefficients are determined simultaneously. Due to the introduction of penalties, the length of the estimates can be far from being optimal for accurate predictions. We introduce a new framework, regression by projection, and its sparse version to analyze high-dimensional data. The unique nature of this framework is that the directions of the regression coefficients are inferred first, and the lengths and the tuning parameters are determined by a cross-validation procedure to achieve the largest prediction accuracy. We provide a theoretical result for simultaneous model selection consistency and parameter estimation consistency of our method in high dimension. This new framework is then generalized such that it can be applied to principal components analysis, partial least squares, and canonical correlation analysis. We also adapt this framework for discriminant analysis. Compared with the existing methods, where there is relatively little control of the dependency among the sparse components, our method can control the relationships among the components. We present efficient algorithms and related theory for solving the sparse regression by projection problem. Based on extensive simulations and real data analysis, we demonstrate that our method achieves good predictive performance and variable selection in the regression setting, and the ability to control relationships between the sparse components leads to more accurate classification. In supplementary materials available online, the details of the algorithms and theoretical proofs, and R codes for all simulation studies are provided.

  18. Project development and commercialisation of on-line analysis systems

    International Nuclear Information System (INIS)

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects, usually lasting 7-10 years, has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems, licensed to Australian companies, are used world-wide. They are now the market leaders for radioisotope gauges in their application field. The third, the multiphase flow meter, was licensed in 1997 to an international company. This meter has even greater potential than the other two systems for economic benefit from its use and for numbers of installations. (author)

  19. Impact Analysis of Allocation of Resources by Project Manager on Success of Software Projects

    OpenAIRE

    Nair, T. R. Gopalakrishnan; V, Suma.; R, Shashi Kumar N.

    2014-01-01

    Generation Production of successful software project is one of the prime considerations of software industry. Engineering high quality software products is further influenced by several factors such as budget, schedule, resource constraints etc. A project manager is responsible for estimation and allocation of these resources in a project. Hence, role of project manager has a vital influence on success of the project. This research comprises of an empirical study of several projects developed...

  20. Multidimensional Projections for Visual Analysis of Social Networks

    Institute of Scientific and Technical Information of China (English)

    Rafael Messias Martins; Gabriel Faria Andery; Henry Heberle; Fernando Vieira Paulovich; Alneu de Andrade Lopes; Helio Pedrini; Rosane Minghim

    2012-01-01

    Visual analysis of social networks is usually based on graph drawing algorithms and tools.However,social networks are a special kind of graph in the sense that interpretation of displayed relationships is heavily dependent on context.Context,in its turn,is given by attributes associated with graph elements,such as individual nodes,edges,and groups of edges,as well as by the nature of the connections between individuals.In most systems,attributes of individuals and communities are not taken into consideration during graph layout,except to derive weights for force-based placement strategies.This paper proposes a set of novel tools for displaying and exploring social networks based on attribute and connectivity mappings.These properties are employed to layout nodes on the plane via multidimensional projection techniques.For the attribute mapping,we show that node proximity in the layout corresponds to similarity in attribute,leading to easiness in locating similar groups of nodes.The projection based on connectivity yields an initial placement that forgoes force-based or graph analysis algorithm,reaching a meaningful layout in one pass.When a force algorithm is then applied to this initial mapping,the final layout presents better properties than conventional force-based approaches.Numerical evaluations show a number of advantages of pre-mapping points via projections.User evaluation demonstrates that these tools promote ease of manipulation as well as fast identification of concepts and associations which cannot be easily expressed by conventional graph visualization alone.In order to allow better space usage for complex networks,a graph mapping on the surface of a sphere is also implemented.

  1. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  2. Solid waste integrated cost analysis model: 1991 project year report

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    The purpose of the City of Houston's 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA's Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  3. Hanford isotope project strategic business analysis yttrium-90 (Y-90)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The purpose of this analysis is to address the short-term direction for the Hanford yttrium-90 (Y-90) project. Hanford is the sole DOE producer of Y-90, and is the largest repository for its source in this country. The production of Y-90 is part of the DOE Isotope Production and Distribution (IP and D) mission. The Y-90 is ``milked`` from strontium-90 (Sr-90), a byproduct of the previous Hanford missions. The use of Sr-90 to produce Y-90 could help reduce the amount of waste material processed and the related costs incurred by the clean-up mission, while providing medical and economic benefits. The cost of producing Y-90 is being subsidized by DOE-IP and D due to its use for research, and resultant low production level. It is possible that the sales of Y-90 could produce full cost recovery within two to three years, at two curies per week. Preliminary projections place the demand at between 20,000 and 50,000 curies per year within the next ten years, assuming FDA approval of one or more of the current therapies now in clinical trials. This level of production would incentivize private firms to commercialize the operation, and allow the government to recover some of its sunk costs. There are a number of potential barriers to the success of the Y-90 project, outside the control of the Hanford Site. The key issues include: efficacy, Food and Drug Administration (FDA) approval and medical community acceptance. There are at least three other sources for Y-90 available to the US users, but they appear to have limited resources to produce the isotope. Several companies have communicated interest in entering into agreements with Hanford for the processing and distribution of Y-90, including some of the major pharmaceutical firms in this country.

  4. Hanford isotope project strategic business analysis yttrium-90 (Y-90)

    International Nuclear Information System (INIS)

    The purpose of this analysis is to address the short-term direction for the Hanford yttrium-90 (Y-90) project. Hanford is the sole DOE producer of Y-90, and is the largest repository for its source in this country. The production of Y-90 is part of the DOE Isotope Production and Distribution (IP and D) mission. The Y-90 is ''milked'' from strontium-90 (Sr-90), a byproduct of the previous Hanford missions. The use of Sr-90 to produce Y-90 could help reduce the amount of waste material processed and the related costs incurred by the clean-up mission, while providing medical and economic benefits. The cost of producing Y-90 is being subsidized by DOE-IP and D due to its use for research, and resultant low production level. It is possible that the sales of Y-90 could produce full cost recovery within two to three years, at two curies per week. Preliminary projections place the demand at between 20,000 and 50,000 curies per year within the next ten years, assuming FDA approval of one or more of the current therapies now in clinical trials. This level of production would incentivize private firms to commercialize the operation, and allow the government to recover some of its sunk costs. There are a number of potential barriers to the success of the Y-90 project, outside the control of the Hanford Site. The key issues include: efficacy, Food and Drug Administration (FDA) approval and medical community acceptance. There are at least three other sources for Y-90 available to the US users, but they appear to have limited resources to produce the isotope. Several companies have communicated interest in entering into agreements with Hanford for the processing and distribution of Y-90, including some of the major pharmaceutical firms in this country

  5. Highway Electrification And Automation Technologies - Regional Impacts Analysis Project: Phase I: Baseline Scenario Data Analysis

    OpenAIRE

    Scag; Path

    1993-01-01

    The Highway Electrification and Automation Technologies Regional Impacts Analysis Project addresses the transportation-related problems of freeway congestion, air pollution, and dependence on fossil fuels in southern California. This report presents a documentation of the basis for the impacts analysis. It contains sections on data collected, baseline forecast for 2025, and electrification and automation specification scenarios. This report constitutes the final report for Phase I of the proj...

  6. Accident consequence calculations for project W-058 safety analysis

    International Nuclear Information System (INIS)

    Accident consequence analyses have been performed for Project W-058, the Replacement Cross Site Transfer System. using the assumption and analysis techniques developed for the Tank Remediation Waste system Basis for Interim Operation. most potential accident involving the FISTS are bounded by the TWRS BIO analysis. However, the spray leak and pool leak scenarios require revised analyses since the RCSTS design utilizes larger diameter pipe and higher pressures than those analyzed in the TWRS BIO. Also the volume of diversion box and vent station are larger than that assumed for the valve pits in the TWRS BIO, which effects results of sprays or spills into the pits. the revised analysis for the spray leak is presented in Section 2, for the above ground spill in Section 3, for the presented in Section 2, for the above ground spill in Section 3, for the subsurface spill forming a pool in Section 4, and for the subsurface pool remaining subsurface in Section 5. The conclusion from these sections are summarized below

  7. The Victoria Project, Sri Lanka. Hydrological analysis for Victoria Dam

    Energy Technology Data Exchange (ETDEWEB)

    Piper, B.S. [GU Projects (United Kingdom); Sutcliffe, J.V. [Gibb (Sir Alexander) and Partners (United Kingdom); Parks, Y.P. [Institute of Hydrology (United Kingdom)

    1994-03-01

    The hydrological analyses described in this paper formed an important part of the studies for the Victoria Project of which the Victoria Dam is the major component. The purpose of the hydrological studies was to provide consistent sets of river flow and climate data at the sites of the major components of the project, and to provide flood estimates for sizing the spillway and river diversion works. This paper outlines the approach used in the overall study, and then concentrates on aspects of specific relevance to the Victoria Dam. The main hydrological characteristics of the upper Mahaweli basin are presented as an introduction to the overall water balance; the humid climate made the appraisal of flow records relatively simple. Time series modelling was used to fill gaps in the observed flow records used for reservoir operation studies. The spillway design flood was based on the probable maximum precipitation (PMP) derived by maximizing a historic storm in which rainfall approaching the PMP covered most of the basin. Construction floods of moderate return period were estimated from a dimensionless analysis of regional flood records. The main lessons to be drawn are that water balance methods are of particular value in these humid monsoon conditions, while the ratio of the PMP to the maximum recorded storm is lower than would be the case in more arid regions. (author)

  8. NGNP Project Regulatory Gap Analysis for Modular HTGRs

    Energy Technology Data Exchange (ETDEWEB)

    Wayne Moe

    2011-09-01

    The Next Generation Nuclear Plant (NGNP) Project Regulatory Gap Analysis (RGA) for High Temperature Gas-Cooled Reactors (HTGR) was conducted to evaluate existing regulatory requirements and guidance against the design characteristics specific to a generic modular HTGR. This final report presents results and identifies regulatory gaps concerning current Nuclear Regulatory Commission (NRC) licensing requirements that apply to the modular HTGR design concept. This report contains appendices that highlight important HTGR licensing issues that were found during the RGA study. The information contained in this report will be used to further efforts in reconciling HTGR-related gaps in the NRC licensing structure, which has to date largely focused on light water reactor technology.

  9. New Technologies for DNA analysis-A review of the READNA Project

    NARCIS (Netherlands)

    McGinn, Steven; Bauer, David; Brefort, Thomas; Dong, Liqin; El-Sagheer, Afaf; Elsharawy, Abdou; Evans, Geraint; Falk-Sörqvist, Elin; Forster, Michael; Fredriksson, Simon; Freeman, Peter; Freitag, Camilla; Fritzsche, Joachim; Gibson, Spencer; Gullberg, Mats; Gut, Marta; Heath, Simon; Heath-Brun, Isabelle; Heron, Andrew J; Hohlbein, Johannes; Ke, Rongqin; Lancaster, Owen; Le Reste, Ludovic; Maglia, Giovanni; Marie, Rodolphe; Mauger, Florence; Mertes, Florian; Mignardi, Marco; Moens, Lotte; Oostmeijer, Jelle; Out, Ruud; Pedersen, Jonas Nyvold; Persson, Fredrik; Picaud, Vincent; Rotem, Dvir; Schracke, Nadine; Sengenes, Jennifer; Stähler, Peer F; Stade, Björn; Stoddart, David; Teng, Xia; Veal, Colin D; Zahra, Nathalie; Bayley, Hagan; Beier, Markus; Brown, Tom; Dekker, Cees; Ekström, Björn; Flyvbjerg, Henrik; Franke, Andre; Guenther, Simone; Kapanidis, Achillefs N; Kaye, Jane; Kristensen, Anders; Lehrach, Hans; Mangion, Jonathan; Sauer, Sascha; Schyns, Emile; Tost, Jörg; van Helvoort, Joop M L M; van der Zaag, Pieter J; Tegenfeldt, Jonas O; Brookes, Anthony J; Mir, Kalim; Nilsson, Mats; Willcocks, Spike; Gut, Ivo G

    2015-01-01

    The REvolutionary Approaches and Devices for Nucleic Acid analysis (READNA) project received funding from the European Commission for 4 1/2 years. The objectives of the project revolved around technological developments in nucleic acid analysis. The project partners have discovered, created and deve

  10. Manage Stakeholders approach for analysis and risk assessment in the implementation of innovative projects

    OpenAIRE

    СУХОНОС, Марія Костянтинівна; Угоднікова, Олена Ігорівна

    2012-01-01

    The problem of innovation project risk management, notably Manage Stakeholder's risks, is consider in this article. The methodology of analysis and assessment Manage Stakeholder's risks in innovation projects is suggest

  11. GLobal Ocean Data Analysis Project (GLODAP) version 1.1 (NODC Accession 0001644)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The GLobal Ocean Data Analysis Project (GLODAP) is a cooperative effort to coordinate global synthesis projects funded through NOAA/DOE and NSF as part of the Joint...

  12. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  13. Project portfolio selection: Multi-criteria analysis and interactions between projects

    OpenAIRE

    BENAIJA, Khadija; Kjiri, Laila

    2015-01-01

    In the project portfolio management, the project selection phase presents the greatest interest. In this article, we focus on this important phase by proposing a new method of projects selection consisting of several steps. We propose as a first step, a classification of projects based on the three most important criteria namely the value maximization, risk minimization and strategic alignment. The second step is building alternatives portfolio by the portfolio managers taking into account th...

  14. Source-domain spectral EEG analysis of sports-related concussion via Measure Projection Analysis.

    Science.gov (United States)

    Balkan, Ozgur; Virji-Babul, Naznin; Miyakoshi, Makoto; Makeig, Scott; Garudadri, Harinath

    2015-08-01

    Here, we investigated EEG-based source-level spectral differences between adolescents with sports-related concussions and healthy age matched controls. We transformed resting state EEG collected in both groups to the source domain using Independent Component Analysis (ICA) and computed the component process power spectra. For group-level analysis in the source domain, we used a probabilistic framework, Measure Projection Analysis (MPA), that has advantages over parametric k-means clustering of brain sources. MPA revealed that some frontal brain sources in the concussed group had significantly more power in the beta band (pconcussion from healthy controls. PMID:26737184

  15. Value of Information Analysis Project Gnome Site, New Mexico

    International Nuclear Information System (INIS)

    The Project Gnome site in southeastern New Mexico was the location of an underground nuclear detonation in 1961 and a hydrologic tracer test using radionuclides in 1963. The tracer test is recognized as having greater radionuclide migration potential than the nuclear test because the tracer test radionuclides (tritium, 90Sr, 131I, and 137Cs) are in direct contact with the Culebra Dolomite aquifer, whereas the nuclear test is within a bedded salt formation. The tracer test is the topic here. Recognizing previous analyses of the fate of the Gnome tracer test contaminants (Pohll and Pohlmann, 1996; Pohlmann and Andricevic, 1994), and the existence of a large body of relevant investigations and analyses associated with the nearby Waste Isolation Pilot Plant (WIPP) site (summarized in US DOE, 2009), the Gnome Site Characterization Work Plan (U.S. DOE, 2002) called for a Data Decision Analysis to determine whether or not additional characterization data are needed prior to evaluating existing subsurface intrusion restrictions and determining long-term monitoring for the tracer test. Specifically, the Work Plan called for the analysis to weigh the potential reduction in uncertainty from additional data collection against the cost of such field efforts.

  16. Value of Information Analysis Project Gnome Site, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Greg Pohll; Jenny Chapman

    2010-01-01

    The Project Gnome site in southeastern New Mexico was the location of an underground nuclear detonation in 1961 and a hydrologic tracer test using radionuclides in 1963. The tracer test is recognized as having greater radionuclide migration potential than the nuclear test because the tracer test radionuclides (tritium, 90Sr, 131I, and 137Cs) are in direct contact with the Culebra Dolomite aquifer, whereas the nuclear test is within a bedded salt formation. The tracer test is the topic here. Recognizing previous analyses of the fate of the Gnome tracer test contaminants (Pohll and Pohlmann, 1996; Pohlmann and Andricevic, 1994), and the existence of a large body of relevant investigations and analyses associated with the nearby Waste Isolation Pilot Plant (WIPP) site (summarized in US DOE, 2009), the Gnome Site Characterization Work Plan (U.S. DOE, 2002) called for a Data Decision Analysis to determine whether or not additional characterization data are needed prior to evaluating existing subsurface intrusion restrictions and determining long-term monitoring for the tracer test. Specifically, the Work Plan called for the analysis to weigh the potential reduction in uncertainty from additional data collection against the cost of such field efforts.

  17. Integrating multicriteria evaluation and stakeholders analysis for assessing hydropower projects

    International Nuclear Information System (INIS)

    The use of hydroelectric potential and the protection of the river ecosystem are two contrasting aspects that arise in the management of the same resource, generating conflicts between different stakeholders. The purpose of the paper is to develop a multi-level decision-making tool, able to support energy planning, with specific reference to the construction of hydropower plants in mountain areas. Starting from a real-world problem concerning the basin of the Sesia Valley (Italy), an evaluation framework based on the combined use of Multicriteria Evaluation and Stakeholders Analysis is proposed in the study. The results of the work show that the methodology is able to grant participated decisions through a multi-stakeholders traceable and transparent assessment process, to highlight the important elements of the decision problem and to support the definition of future design guidelines. - Highlights: • The paper concerns a multi-level decision-making tool able to support energy planning. • The evaluation framework is based on the use of AHP and Stakeholders Analysis. • Hydropower projects in the Sesia Valley (Italy) are evaluated and ranked in the study. • Environmental, economic, technical and sociopolitical criteria have been considered. • 42 stakeholder groups have been included in the evaluation

  18. The economics of project analysis: Optimal investment criteria and methods of study

    Science.gov (United States)

    Scriven, M. C.

    1979-01-01

    Insight is provided toward the development of an optimal program for investment analysis of project proposals offering commercial potential and its components. This involves a critique of economic investment criteria viewed in relation to requirements of engineering economy analysis. An outline for a systems approach to project analysis is given Application of the Leontief input-output methodology to analysis of projects involving multiple processes and products is investigated. Effective application of elements of neoclassical economic theory to investment analysis of project components is demonstrated. Patterns of both static and dynamic activity levels are incorporated.

  19. "A Note on New Product Project Selection Model: Empirical Analysis in Chemical Industry" (in Japanese)

    OpenAIRE

    Kenichi Kuwashima; Junichi Tomita

    2001-01-01

    By focusing its attention on one particular scoring method that is used to evaluate R&D projects, this paper seeks to specify empirically the factors that discriminate successful projects from failed projects in the Japanese chemical industry. Our statistical analysis revealed that when projects are evaluated in this industry, three factors, marketability, technology, and synergistic potential, tend to be valued by practitioners approximately in a 3:2:1 ratio. Although the project evaluations...

  20. Techno-economic analysis of nuclear project management in South Africa / Kit Fung Jeffrey Chan

    OpenAIRE

    Chan, Kit Fung Jeffrey

    2014-01-01

    This research report is a techno-economic analysis of the nuclear project management capacity in South Africa. It will focus on the project development phases of the nuclear expansion programme. The author has nuclear engineering training background and also currently involved in the Eskom new build programme (Medupi & Kusile) and the coal refurbishment projects. The following thinking philosophy is used to structure this research report: * Project management practise for nuclear projects glo...

  1. Project Method in Adult Education: Self-Experience Analysis

    OpenAIRE

    Lasmane, Ija

    2015-01-01

    The project methodhas swiftly gained ground in education and it has nowbecome integral to the education process offering new ways for modernizing the education environment.Implementing projects provides learning opportunities for all of the involved parties – students, teachers, school principals and parents. In this article the Author has analysed the characteristics of the project method and the differences between project-based adult learningand non-adult learning,and the impact ofglobaliz...

  2. Frequency of conflicts in construction project procurement: A correlation analysis

    OpenAIRE

    Martin O. Dada

    2013-01-01

    Conflicts occur on construction projects and may degenerate into unpleasant situations such as claims, lawsuits and project abandonment. This research investigated the frequency and correlates of conflicts in identified conflict centers on projects procured with either the traditional method or integrated methods. Conflicts were measured in terms of their frequencies of occurrence. Five internal conflict centers on construction projects were identified and used. Questionnaires were administer...

  3. Which territorial integration of participative renewable energies? Present status and analysis of French projects. Final report

    International Nuclear Information System (INIS)

    This study aimed at qualifying actors involved in projects (stakeholders, motivations, who decides what and how), at identifying the available resources (technical and financial abilities, project management abilities), at describing the mobilisation work and territorial dialogue processes, and at exploring how benefit distribution contributes to territorial dynamics. This study first identified participative renewable energy projects in France. A survey by questionnaire was then performed among project holders. Six projects have also been more deeply studied (a mix of solar and photovoltaic and wind energy, two wind farms located in two different regions, a solar photovoltaic project, a hydroelectric project, and a project on biomass from forest). After the methodology, the report defines what a participative renewable energy project is, proposes an overview of these projects in 2015, present the case studies, and proposes an analysis on the different aspects of the project process

  4. Evaluation of the Field Test of Project Information Packages: Volume III--Resource Cost Analysis.

    Science.gov (United States)

    Al-Salam, Nabeel; And Others

    The third of three volumes evaluating the first year field test of the Project Information Packages (PIPs) provides a cost analysis study as a key element in the total evaluation. The resource approach to cost analysis is explained and the specific resource methodology used in the main cost analysis of the 19 PIP field-test projects detailed. The…

  5. THE CAVES Project - Collaborative Analysis Versioning Environment System; THE CODESH Project - Collaborative Development Shell

    CERN Document Server

    Bourilkov, D

    2004-01-01

    A key feature of collaboration in science and software development is to have a {\\em log} of what and how is being done - for private use and reuse and for sharing selected parts with collaborators, which most often today are distributed geographically on an ever larger scale. Even better if this log is {\\em automatic}, created on the fly while a scientist or software developer is working in a habitual way, without the need for extra efforts. The {\\tt CAVES} and {\\tt CODESH} projects address this problem in a novel way, building on the concepts of {\\em virtual state} and {\\em virtual transition} to provide an automatic persistent logbook for sessions of data analysis or software development in a collaborating group. A repository of sessions can be configured dynamically to record and make available the knowledge accumulated in the course of a scientific or software endeavor. Access can be controlled to define logbooks of private sessions and sessions shared within or between collaborating groups.

  6. Justification of investment projects of biogas systems by the sensitivity analysis

    OpenAIRE

    Perebijnos Vasilij Ivanovich; Gavrish Valerij Ivanovich

    2015-01-01

    Methodical features of sensitivity analysis application for evaluation of biogas plants investment projects are shown in the article. Risk factors of the indicated investment projects have been studied. Methodical basis for the use of sensitivity analysis and calculation of elasticity coefficient has been worked out. Calculation of sensitivity analysis and elasticity coefficient of three biogas plants projects, which differ in direction of biogas transformation: use in co-generation plant, ap...

  7. The software analysis project for the Office of Human Resources

    Science.gov (United States)

    Tureman, Robert L., Jr.

    1994-01-01

    There were two major sections of the project for the Office of Human Resources (OHR). The first section was to conduct a planning study to analyze software use with the goal of recommending software purchases and determining whether the need exists for a file server. The second section was analysis and distribution planning for retirement planning computer program entitled VISION provided by NASA Headquarters. The software planning study was developed to help OHR analyze the current administrative desktop computing environment and make decisions regarding software acquisition and implementation. There were three major areas addressed by the study: current environment new software requirements, and strategies regarding the implementation of a server in the Office. To gather data on current environment, employees were surveyed and an inventory of computers were produced. The surveys were compiled and analyzed by the ASEE fellow with interpretation help by OHR staff. New software requirements represented a compilation and analysis of the surveyed requests of OHR personnel. Finally, the information on the use of a server represents research done by the ASEE fellow and analysis of survey data to determine software requirements for a server. This included selection of a methodology to estimate the number of copies of each software program required given current use and estimated growth. The report presents the results of the computing survey, a description of the current computing environment, recommenations for changes in the computing environment, current software needs, management advantages of using a server, and management considerations in the implementation of a server. In addition, detailed specifications were presented for the hardware and software recommendations to offer a complete picture to OHR management. The retirement planning computer program available to NASA employees will aid in long-range retirement planning. The intended audience is the NASA civil

  8. Estimation of Project Completion Time and Factors Analysis for Concurrent Engineering Project Management: A Simulation Approach

    OpenAIRE

    Huang, Enzhen; Chen, Shi-Jie

    2006-01-01

    Abstract In concurrent engineering projects, tasks are usually interdependent among each other that require much iteration before completion where the critical path method/program evaluation and review technique (CPM/PERT) may not be applicable to help estimate the project duration. In addition, carrying out a large-scaled project in a dynamic environment has to deal with various factors at the same time. W...

  9. UMTRA project water sampling and analysis plan, Gunnison, Colorado

    International Nuclear Information System (INIS)

    This water sampling and analysis plan summarizes the results of previous water sampling activities and the plan for water sampling activities for calendar year 1994. A buffer zone monitoring plan is included as an appendix. The buffer zone monitoring plan is designed to protect the public from residual contamination that entered the ground water as a result of former milling operations. Surface remedial action at the Gunnison Uranium Mill Tailings Remedial Action Project site began in 1992; completion is expected in 1995. Ground water and surface water will be sampled semiannually in 1994 at the Gunnison processing site (GUN-01) and disposal site (GUN-08). Results of previous water sampling at the Gunnison processing site indicate that ground water in the alluvium is contaminated by the former uranium processing activities. Background ground water conditions have been established in the uppermost aquifer (Tertiary gravels) at the Gunnison disposal site. The monitor well locations provide a representative distribution of sampling points to characterize ground water quality and ground water flow conditions in the vicinity of the sites. The list of analytes has been modified with time to reflect constituents that are related to uranium processing activities and the parameters needed for geochemical evaluation. Water sampling will be conducted at least semiannually during and one year following the period of construction activities, to comply with the ground water protection strategy discussed in the remedial action plan (DOE, 1992a)

  10. Discovery and New Frontiers Project Budget Analysis Tool

    Science.gov (United States)

    Newhouse, Marilyn E.

    2011-01-01

    The Discovery and New Frontiers (D&NF) programs are multi-project, uncoupled programs that currently comprise 13 missions in phases A through F. The ability to fly frequent science missions to explore the solar system is the primary measure of program success. The program office uses a Budget Analysis Tool to perform "what-if" analyses and compare mission scenarios to the current program budget, and rapidly forecast the programs ability to meet their launch rate requirements. The tool allows the user to specify the total mission cost (fixed year), mission development and operations profile by phase (percent total mission cost and duration), launch vehicle, and launch date for multiple missions. The tool automatically applies inflation and rolls up the total program costs (in real year dollars) for comparison against available program budget. Thus, the tool allows the user to rapidly and easily explore a variety of launch rates and analyze the effect of changes in future mission or launch vehicle costs, the differing development profiles or operational durations of a future mission, or a replan of a current mission on the overall program budget. Because the tool also reports average monthly costs for the specified mission profile, the development or operations cost profile can easily be validate against program experience for similar missions. While specifically designed for predicting overall program budgets for programs that develop and operate multiple missions concurrently, the basic concept of the tool (rolling up multiple, independently-budget lines) could easily be adapted to other applications.

  11. Repowering analysis: Hanford Generating Project (HGP), Task Order Number 6

    International Nuclear Information System (INIS)

    The Hanford Generating Project (HGP), owned by the Washington Public Power Supply System, consists of two low pressure steam turbines, generators, and associated equipment located adjacent to the Department of Energy's (DOE) N-Reactor. HGP has been able to produce approximately 800 MWe with low pressure steam supplied by N-Reactor. DOE has placed N-Reactor in cold standby status for an undetermined length of time. This results in the idling of the HGP since no alternative source of steam is available. Bonneville Power Administration contracted with Fluor Daniel, Inc. to investigate the feasibility and cost of constructing a new source of steam for (repowering) one of the HGP turbines. The steam turbine is currently operated with 135 psia steam. The turbines can be rebuilt to operate with 500 psia steam pressure by adding additional stages, buckets, nozzles, and diaphragms. Because of the low pressure design, this turbine can never achieve the efficiencies possible in new high pressure turbines by the presences of existing equipment reduces the capital cost of a new generating resource. Five repowering options were investigated in this study. Three cases utilizing gas turbine combined cycle steam generation equipment, one case utilizing a gas fired boiler, and a case utilizing a coal fired boiler. This report presents Fluor Daniel's analysis of these repowering options

  12. AN ANALYSIS ON EFFICIENT PROJECT-MANAGEMENT BY USING PRIMAVERA

    OpenAIRE

    Prof. P.K Gunjal*, Rajiv Kumar Goswami, Punit M Bedmutha

    2016-01-01

    Project Controlling uses the data of collection, recording and reporting information to bring Actual performance to planned performance. As larger the as more the complexity is in exchange information on timely basis gets reduce. As a result we see project don’t achieve its mission within allotted time and cost. Increasing the productivity in terms of material and human resource is called project management. To achieve desire result we are using Primavera a product of oracle. Primavera ...

  13. Guangzhou Green Trucks Pilot Project : Background Analysis Report

    OpenAIRE

    Clean Air Initiative for Asian Cities Center

    2010-01-01

    This document was devloped as it initiated a pilot project - dubbed Guangzhou Green Trucks Pilot Project in support of Guangzhou's efforts to improve air quality in preparation for the 2010 Asian Games. The goal of this project was to develop a proof of concept for a truck program in Guangdong Province, and possibly China, that aims to: Enhance the fuel economy of the truck fleet, Reduce b...

  14. Incorporating Asymmetric Dependency Patterns in the Evaluation of IS/IT projects Using Real Option Analysis

    Science.gov (United States)

    Burke, John C.

    2012-01-01

    The objective of my dissertation is to create a general approach to evaluating IS/IT projects using Real Option Analysis (ROA). This is an important problem because an IT Project Portfolio (ITPP) can represent hundreds of projects, millions of dollars of investment and hundreds of thousands of employee hours. Therefore, any advance in the…

  15. Data Analysis Algorithm Suitable for Structural Health Monitoring Based on Dust Network Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This proposed project will attempt to develop a data analysis system for structural health monitoring on space structures. The data analysis software will be a key...

  16. Practice curriculum analysis-project of resources optimum using into linear programming production planning

    OpenAIRE

    Victor I. Samarin

    2011-01-01

    The economics analysis structural project of linear programming optimum production solution is given for students’ individual work on Operation Research. The analysis of productivity varying indexes both for graphic and for tableau modify simplex solutions is considered.

  17. ANALYSIS OF TIME MANAGEMENT APPLIED TO A PROJECT OF OIL

    Directory of Open Access Journals (Sweden)

    Arielle Meireles Moreira

    2011-05-01

    Full Text Available Project management (PM efficient results in increased probability of success of activities and its completion as time, cost and scope planned. Since this triad (time, cost and scope is connected, any changes will affect within the scope and increase the cost of the project. This was a case study in a large company exploiting oil and gas. The research is focused on time management (TM in an oil project in order to examine the schedule of activities according to the time tool, the Gantt Chart in MS Project 2003 software. The study design was selected due to its long delay in implementation and lack of planning and managing this. By analyzing the Gantt Chart, activities were identified late. With this, the problems that caused delays were surveyed (the project documents and their parents questioned. Thus, it was proposed improvements to an effective control of time on the problems encountered.

  18. Gas quality analysis and evaluation program for project Gasbuggy

    International Nuclear Information System (INIS)

    Experimental results of the gas quality analysis program for Project Gasbuggy through August 1969 are presented graphically, addressing the questions raised by the preshot program goals. The chemical composition and the concentrations of tritium, krypton-85, carbon-14 and argon-37, 39 are presented as a function of time and gas production from the nuclear chimney. Chemically, the presence of CO2, CO and H2 served to dilute the formation gas and caused reactions which significantly altered the gas composition at early times. The radionuclide content of the chimney gas at reentry was some 800 pCi/cm3 of which about 80% was CH3T. Lesser quantities of tritium were observed as HT, C2H5T and C3H7T. The other major contaminant was Kr85 which was present at about one-fifth the level of CH3T. Small quantities of carbon-14 and argon-39 were also identified. The only other radionuclides identified in the gas were relatively short-lived rare gases. During the production testing, about two and one-half chimney volumes of gas at formation pressure were removed. This removal, accompanied by dilution, has reduced the radionuclide concentrations to about 7% of their levels at reentry. The production characteristics of the Gasbuggy environment prevented an adequate test of the effectiveness of chimney flushing. However, the rapid drawdown concept is supported by the available data as an effective means of reducing contaminant levels. The changes in composition during production or testing are seen to be consistent with a model involving a non-uniform gas influx rate and flow distribution over the chimney region. Mixing times are estimated to be on the order of a few days, so that increasing concentrations following a sudden gas influx can be explained. (author)

  19. Justification of investment projects of biogas systems by the sensitivity analysis

    Directory of Open Access Journals (Sweden)

    Perebijnos Vasilij Ivanovich

    2015-06-01

    Full Text Available Methodical features of sensitivity analysis application for evaluation of biogas plants investment projects are shown in the article. Risk factors of the indicated investment projects have been studied. Methodical basis for the use of sensitivity analysis and calculation of elasticity coefficient has been worked out. Calculation of sensitivity analysis and elasticity coefficient of three biogas plants projects, which differ in direction of biogas transformation: use in co-generation plant, application of biomethane as motor fuel and resulting carbon dioxide as marketable product, has been made. Factors strongly affecting projects efficiency have been revealed.

  20. Network theory-based analysis of risk interactions in large engineering projects

    International Nuclear Information System (INIS)

    This paper presents an approach based on network theory to deal with risk interactions in large engineering projects. Indeed, such projects are exposed to numerous and interdependent risks of various nature, which makes their management more difficult. In this paper, a topological analysis based on network theory is presented, which aims at identifying key elements in the structure of interrelated risks potentially affecting a large engineering project. This analysis serves as a powerful complement to classical project risk analysis. Its originality lies in the application of some network theory indicators to the project risk management field. The construction of the risk network requires the involvement of the project manager and other team members assigned to the risk management process. Its interpretation improves their understanding of risks and their potential interactions. The outcomes of the analysis provide a support for decision-making regarding project risk management. An example of application to a real large engineering project is presented. The conclusion is that some new insights can be found about risks, about their interactions and about the global potential behavior of the project. - Highlights: ► The method addresses the modeling of complexity in project risk analysis. ► Network theory indicators enable other risks than classical criticality analysis to be highlighted. ► This topological analysis improves project manager's understanding of risks and risk interactions. ► This helps project manager to make decisions considering the position in the risk network. ► An application to a real tramway implementation project in a city is provided.

  1. Project estimation and selection using the cost: Effectiveness analysis and multi-criteria analysis

    Directory of Open Access Journals (Sweden)

    Nikola Č. Petrović

    2012-07-01

    Full Text Available With the desintegration of the former Yugoslavia, the needs for military technique had been significantly reduced. The capacities that exceed the scope and the structure of these needs, for which an export-oriented production would be economically sustainable, should be redirected to the production of regular consumption products. Following the practice of developed countries with multinational character projects and cooperative production of complex military assets would increase the opportunities for such a redirection. That orientation would go in favor of the prevention-based defense policy which is the strategic orientation of our country. Moreover, self-reliance in the production is viable only for some weaponry and military equipment where the economy reaches a full production scale and for which there is a possibility of export. The aim of this study is to show the need for analyzing the socialeconomic sustainability of developing and producing complex weapons and military equipment in a joint venture with the countries in the region and beyond, without jeopardizing the security of the country's current and sustainable security. This analysis is a useful tool not only for rating the project's accceptability, but also for selecting the best alternative among several project variants. It is not possible to monetize entirely the effects of benefits for a society correlating with the introduction into service of complex combat systems; therefore, a cost benefit analysis and multicriteria analysis are used for the evaluation of investment profitability. In the context of the object and purpose of the research, the methods of analysis and synthesis are used as well as the investment evaluation method. A graphic illustration and four tables are given in order to clarify the author's views.

  2. Global Inventory and Analysis of Smart Grid Demonstration Projects

    Energy Technology Data Exchange (ETDEWEB)

    Mulder, W.; Kumpavat, K.; Faasen, C.; Verheij, F.; Vaessen, P [DNV KEMA Energy and Sustainability, Arnhem (Netherlands)

    2012-10-15

    As the key enabler of a more sustainable, economical and reliable energy system, the development of smart grids has received a great deal of attention in recent times. In many countries around the world the benefits of such a system have begun to be investigated through a number of demonstration projects. With such a vast array of projects it can be difficult to keep track of changes, and to understand which best practices are currently available with regard to smart grids. This report aims to address these issues through providing a comprehensive outlook on the current status of smart grid projects worldwide.

  3. ANALYSIS OF TIME MANAGEMENT APPLIED TO A PROJECT OF OIL

    OpenAIRE

    Arielle Meireles Moreira; Raquel Soares da Silva; Manuel Antonio Molina Palma

    2011-01-01

    Project management (PM) efficient results in increased probability of success of activities and its completion as time, cost and scope planned. Since this triad (time, cost and scope) is connected, any changes will affect within the scope and increase the cost of the project. This was a case study in a large company exploiting oil and gas. The research is focused on time management (TM) in an oil project in order to examine the schedule of activities according to the time tool, the Gantt Char...

  4. Integrated Modeling, Analysis, and Verification for Space Missions Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This project will further MBSE technology in fundamental ways by strengthening the link between SysML tools and framework engineering execution environments....

  5. Asymptotic distributions in the projection pursuit based canonical correlation analysis

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    In this paper, associations between two sets of random variables based on the projection pursuit (PP) method are studied. The asymptotic normal distributions of estimators of the PP based canonical correlations and weighting vectors are derived.

  6. Integrated Adaptive Analysis and Visualization of Satellite Network Data Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to develop a system that enables integrated and adaptive analysis and visualization of satellite network management data. Integrated analysis and...

  7. Big Rock Point: An Analysis of Project Estimate Performance

    International Nuclear Information System (INIS)

    The Big Rock Point Restoration Project is well into its third year of decommissioning and restoring the site to a green-field condition. Although the project has gone well and remains on schedule and within budget, much has been learned about decommissioning cost estimates versus actual costs, as well as areas in which the estimate appears adequate and in which the estimate is challenged. These items are briefly described in this report

  8. Analysis of Time Management Applied to a Project of Oil

    OpenAIRE

    Moreira, Arielle Meireles; da Silva, Raquel Soares; Palma, Manuel Antonio Molina

    2011-01-01

    Project management (PM) efficient results in increased probability of success of activities and itscompletion as time, cost and scope planned. Since this triad (time, cost and scope) is connected, anychanges will affect within the scope and increase the cost of the project. This was a case study in alarge company exploiting oil and gas. The research is focused on time management (TM) in an oilproject in order to examine the schedule of activities according to the time tool, the Gantt Chart in...

  9. Cross-analysis of Transversal Competences in Project Management

    OpenAIRE

    González-Marcos, Ana; Alba Elias, Fernando; ORDIERES MERE, JOAQUIN BIENVENIDO; Navaridas-Nalda, Fermín

    2014-01-01

    This paper presents a framework for project management competence assessment based on participant’s performance and contribution in a simulated environment. The proposed framework considers competence assessment through evidences and the participation of different roles. The system enforces the assessment of individual competences by means of a set of performance indicators. A specific case study is presented and the relationship between exhibited transversal competences and project qualit...

  10. Stochastic project networks temporal analysis, scheduling and cost minimization

    CERN Document Server

    Neumann, Klaus

    1990-01-01

    Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does no...

  11. Microcomputer model for an analysis of the financial feasibility of a mining project

    International Nuclear Information System (INIS)

    The model presented permits a simulation of the predicted profitability of a mining project at the stage of feasibility studies by making use of a simple individual computer, the Apple II. The model presented can be used to treat the following three areas: definition of the mode of financing the project and calculation of the financial flows which make it possible to evaluate the profitability of this project; analysis of sensitivity, which makes it possible to determine the most critical variables for the future of the project; analysis of the risk

  12. Generalized Geophysical Retrieval and Analysis Tool for Planetary Atmospheres Project

    Data.gov (United States)

    National Aeronautics and Space Administration — CPI proposes to develop an innovative, generalized retrieval algorithm and analysis tool (GRANT) that will facilitate analysis of remote sensing data from both...

  13. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  14. Alternative Nonvolatile Residue Analysis with Contaminant Identification Project

    Science.gov (United States)

    Loftin, Kathleen (Compiler); Summerfield, Burton (Compiler); Thompson, Karen (Compiler); Mullenix, Pamela (Compiler); Zeitlin, Nancy (Compiler)

    2015-01-01

    Cleanliness verification is required in numerous industries including spaceflight ground support, electronics, medical and aerospace. Currently at KSC requirement for cleanliness verification use solvents that environmentally unfriendly. This goal of this project is to produce an alternative cleanliness verification technique that is both environmentally friendly and more cost effective.

  15. Employment Opportunity Pilot Project: Analysis of Program Impacts

    OpenAIRE

    Randall Brown; John Burghardt; Edward Cavin; David Long; Charles Mallar; Rebecca Maynard; Charles Metcalf; Craig Thornton; Christine Whitebread

    1983-01-01

    The Employment Opportunity Pilot Project (EOPP) was instituted to determine whether a program that provided job-search assistance and subsidized employment and training could succeed in increasing the employment and, hence, reducing the welfare dependence of adults in low-income families with children.

  16. Adapting benchmarking to project management : an analysis of project management processes, metrics, and benchmarking process models

    OpenAIRE

    Emhjellen, Kjetil

    1997-01-01

    Since the first publication on benchmarking in 1989 by Robert C. Camp of “Benchmarking: The search for Industry Best Practices that Lead to Superior Performance”, the improvement technique benchmarking has been established as an important tool in the process focused manufacturing or production environment. The use of benchmarking has expanded to other types of industry. Benchmarking has past the doorstep and is now in early trials in the project and construction environment....

  17. New technologies for DNA analysis - a review of the READNA Project.

    Science.gov (United States)

    McGinn, Steven; Bauer, David; Brefort, Thomas; Dong, Liqin; El-Sagheer, Afaf; Elsharawy, Abdou; Evans, Geraint; Falk-Sörqvist, Elin; Forster, Michael; Fredriksson, Simon; Freeman, Peter; Freitag, Camilla; Fritzsche, Joachim; Gibson, Spencer; Gullberg, Mats; Gut, Marta; Heath, Simon; Heath-Brun, Isabelle; Heron, Andrew J; Hohlbein, Johannes; Ke, Rongqin; Lancaster, Owen; Le Reste, Ludovic; Maglia, Giovanni; Marie, Rodolphe; Mauger, Florence; Mertes, Florian; Mignardi, Marco; Moens, Lotte; Oostmeijer, Jelle; Out, Ruud; Pedersen, Jonas Nyvold; Persson, Fredrik; Picaud, Vincent; Rotem, Dvir; Schracke, Nadine; Sengenes, Jennifer; Stähler, Peer F; Stade, Björn; Stoddart, David; Teng, Xia; Veal, Colin D; Zahra, Nathalie; Bayley, Hagan; Beier, Markus; Brown, Tom; Dekker, Cees; Ekström, Björn; Flyvbjerg, Henrik; Franke, Andre; Guenther, Simone; Kapanidis, Achillefs N; Kaye, Jane; Kristensen, Anders; Lehrach, Hans; Mangion, Jonathan; Sauer, Sascha; Schyns, Emile; Tost, Jörg; van Helvoort, Joop M L M; van der Zaag, Pieter J; Tegenfeldt, Jonas O; Brookes, Anthony J; Mir, Kalim; Nilsson, Mats; Willcocks, James P; Gut, Ivo G

    2016-05-25

    The REvolutionary Approaches and Devices for Nucleic Acid analysis (READNA) project received funding from the European Commission for 41/2 years. The objectives of the project revolved around technological developments in nucleic acid analysis. The project partners have discovered, created and developed a huge body of insights into nucleic acid analysis, ranging from improvements and implementation of current technologies to the most promising sequencing technologies that constitute a 3(rd) and 4(th) generation of sequencing methods with nanopores and in situ sequencing, respectively. PMID:26514324

  18. Job and Task Analysis project at Brookhaven National Laboratory's high flux beam reactor

    International Nuclear Information System (INIS)

    The presenter discussed the Job and Task Analysis (JTA) project conducted at Brookhaven National Laboratory's High Flux Beam Reactor (HFBR). The project's goal was to provide JTA guidelines for use by DOE contractors, then, using the guidelines conduct a JTA for the reactor operator and supervisor positions at the HFBR. Details of the job analysis and job description preparation as well as details of the task selection and task analysis were given. Post JTA improvements to the HFBR training programs were covered. The presentation concluded with a listing of the costs and impacts of the project

  19. Analysis of Installed Measures and Energy Savings for Single-Family Residential Better Buildings Projects

    Energy Technology Data Exchange (ETDEWEB)

    Heaney, M. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Polly, B. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2015-04-30

    This report presents an analysis of data for residential single-family projects reported by 37 organizations that were awarded federal financial assistance (cooperative agreements or grants) by the U.S. Department of Energy’s Better Buildings Neighborhood Program.1 The report characterizes the energy-efficiency measures installed for single-family residential projects and analyzes energy savings and savings prediction accuracy for measures installed in a subset of those projects.

  20. Quantitative method of analysis of the impact of the set of risks on the investment project

    OpenAIRE

    Kotov Viktor Ivanovich

    2014-01-01

    This paper presents new quantitative procedure to estimate finance results of the set of risks influence on the investment projects. This procedure based on sensitive functions and fuzzy set theory. In result we have expectation of border deviation of the objective function of the investment project. There is example of telecommunication project risk-analysis. The advantages of this method over other procedures are discussed.

  1. Quantitative method of analysis of the impact of the set of risks on the investment project

    Directory of Open Access Journals (Sweden)

    Kotov Viktor Ivanovich

    2014-07-01

    Full Text Available This paper presents new quantitative procedure to estimate finance results of the set of risks influence on the investment projects. This procedure based on sensitive functions and fuzzy set theory. In result we have expectation of border deviation of the objective function of the investment project. There is example of telecommunication project risk-analysis. The advantages of this method over other procedures are discussed.

  2. Projecting Meat and Cereals Demand for China Based on a Meta-Analysis of Income Elasticities

    OpenAIRE

    Zhou; Yu, Xiaohua; Abler, David; Chen, Danhong

    2014-01-01

    There are many projections for China's food demand, and the projection results differ significantly from each other. Different values for income elasticities could be a major reason. This study projects meat and cereals demand for China based on a meta-analysis of the income elasticity estimates using a collection of 143 and 240 income elasticity estimates for cereals and meat products, respectively, from 36 primary studies. We find that income elasticities for most cereals (general cereals, ...

  3. Visual Exploration of High-Dimensional Data through Subspace Analysis and Dynamic Projections

    Energy Technology Data Exchange (ETDEWEB)

    Liu, S. [Scientific Computing and Imaging Institute, University of Utah; Wang, B. [Scientific Computing and Imaging Institute, University of Utah; Thiagarajan, Jayaraman J. [Lawrence Livermore National Laboratory; Bremer, Peer -Timo [Lawrence Livermore National Laboratory; Pascucci, Valerio [Scientific Computing and Imaging Institute, University of Utah

    2015-06-01

    We introduce a novel interactive framework for visualizing and exploring high-dimensional datasets based on subspace analysis and dynamic projections. We assume the high-dimensional dataset can be represented by a mixture of low-dimensional linear subspaces with mixed dimensions, and provide a method to reliably estimate the intrinsic dimension and linear basis of each subspace extracted from the subspace clustering. Subsequently, we use these bases to define unique 2D linear projections as viewpoints from which to visualize the data. To understand the relationships among the different projections and to discover hidden patterns, we connect these projections through dynamic projections that create smooth animated transitions between pairs of projections. We introduce the view transition graph, which provides flexible navigation among these projections to facilitate an intuitive exploration. Finally, we provide detailed comparisons with related systems, and use real-world examples to demonstrate the novelty and usability of our proposed framework.

  4. Analysis and Development of a Project Evaluation Process.

    Energy Technology Data Exchange (ETDEWEB)

    Coutant, Charles C.; Cada Glenn F.

    1985-01-01

    The Bonneville Power Administration has responsibility, assigned by the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (Public Law 96-501; 16 USC 839), for implementing the Columbia River Basin Fish and Wildlife Program of the Northwest Power Planning Council. One aspect of this responsibility is evaluation of project proposals and ongoing and completed projects. This report recommends formalized procedures for conducting this work in an accurate, professional, and widely respected manner. Recommendations and justifications are based largely on interviews with federal and state agencies and Indian tribes in the Northwest and nationally. Organizations were selected that have evaluation systems of their own, interact with the Fish and Wildlife Program, or have similar objectives or obligations. Perspective on aspects to be considered were obtained from the social science of evaluation planning. Examples of procedures and quantitative criteria are proposed. 1 figure, 2 tables.

  5. Practical Multi-Disciplinary Analysis Tools for Combustion Devices Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The use of multidisciplinary analysis (MDA) techniques for combustion device environment prediction, including complex fluid mixing phenomena, is now becoming...

  6. Practical Multi-Disciplinary Analysis Tools for Combustion Devices Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The use of multidisciplinary analysis (MDA) techniques for complex fluid/structure interaction phenomena is increasing as proven numerical and visualization...

  7. An Analysis of Random Projections in Cancelable Biometrics

    OpenAIRE

    Arpit, Devansh; Nwogu, Ifeoma; Srivastava, Gaurav; Govindaraju, Venu

    2014-01-01

    With increasing concerns about security, the need for highly secure physical biometrics-based authentication systems utilizing \\emph{cancelable biometric} technologies is on the rise. Because the problem of cancelable template generation deals with the trade-off between template security and matching performance, many state-of-the-art algorithms successful in generating high quality cancelable biometrics all have random projection as one of their early processing steps. This paper therefore p...

  8. CONSUMER POTENTIAL ANALYSIS OF FEASIBILITY CRITERIA OF GEOTHERMAL PROJECTS

    OpenAIRE

    Jenei, Tunde

    2012-01-01

    The University of Debrecen, Faculty of Engineering, has been conducting a research program in geothermal energy since 2008. This program enabled me to devise an analytical study of the monetary and non-monetary criteria of geothermal projects. The monetary criteria of a region or a location for geothermal energy production cover the investment costs of the surface installations and the cost of the drillings. Non-monetary criteria include the geological and geothermal evaluations of a reservoi...

  9. What Drives Natural Gas Consumption in Europe? Analysis and Projections

    OpenAIRE

    Özge Dilaver; Zafer Dilaver; Hunt, Lester C.

    2013-01-01

    Natural gas is an important fuel source for Europe and it is expected to remain so in the near future. The market power of suppliers is an important structural element of the European natural gas market and long-term investment and contracts necessitate reliable projections of natural gas demand. This research attempts to address this need. It investigates the impact of income, real natural gas prices and the underlying energy demand trend (UEDT) on OECD-Europe natural gas consumption by appl...

  10. Analysis of debt leveraging in private power projects

    International Nuclear Information System (INIS)

    As private power (non-utility generation) has grown to become a significant part of the electricity system, increasing concern about its financial implications has arisen. In many cases, the source of this concern has been the substantial reliance of these projects on debt financing. This study examines debt leveraging in private power projects. The policy debate on these issues has typically been conducted at a high level of generality. Critics of the private power industry assert that high debt leveraging confers an unfair competitive advantage by lowering the cost of capital, and that this leveraging is only possible because risks are shifted to the utility. Further, debt leveraging is claimed to be a threat to reliability. On the opposite side, it is argued that debt leveraging imposes costs and obligations not home by utilities, and so there is no financial advantage. The private producers also argue that on balance more risk is shifted away from utilities than to them, and that incentives for reliability are strong. In this study we examine the project finance mechanisms used in private power lending in detail, relying on a sample of actual loan documents. This review and its findings should be relevant to the further evolution of this debate. State regulatory commissions are likely to be interested in it, and Federal legislation to amend the Public Utility Holding Company Act (PUHCA) could require states to consider the implications of debt leveraging in relation to their oversight of utility power purchase programs

  11. Analysis of debt leveraging in private power projects

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.P. (Lawrence Berkeley Lab., CA (United States)); Meal, M.; Doerrer, S.; Morse, S. (Morse, Richard, Weisenmiller Associates, Inc., Oakland, CA (United States))

    1992-08-01

    As private power has grown to become a significant part of the electricity system, increasing concern about its financial implications has arisen. In many cases, the source of this concern has been the substantial reliance of these projects on debt financing. This study examines debt leveraging in private power projects. The policy debate on these issues has typically been conducted at a high level of generality. Critics of the private power industry assert that high debt leveraging confers an unfair competitive advantage by lowering the cost of capital. This leveraging is only possible because risks are shifted to the utility. Further, debt leveraging is claimed to be a threat to reliability. On the opposite side, it is argued that debt leveraging imposes costs and obligations not borne by utilities, and so there is no financial advantage. The private producers also argue that on balance more risk is shifted away from utilities than to them, and that incentives for reliability are strong. In this study we examine the project finance mechanisms used in private power lending in detail, relying on a sample of actual loan documents. This review and its findings should be relevant to the further evolution of this debate. State regulatory commissions are likely to be interested in it, and Federal legislation to amend the Public Utility Holding Company Act (PUHCA) could require states to consider the implications of debt leveraging in relation to their oversight of utility power purchase programs.

  12. Gender Differences in Science Interests: An Analysis of Science Fair Projects.

    Science.gov (United States)

    Lawton, Carol A.; Bordens, Kenneth S.

    Gender differences in science interests were examined in two studies of projects entered in a regional science fair in kindergarten through grade 12. A content analysis of 1,319 project topics and materials submitted to the Northeastern Indiana Regional Science and Engineering Fair from 1991 through 1993 showed that girls were more likely than…

  13. Experiential and Cooperative Learning: Using a Situation Analysis Project in Principles of Marketing

    Science.gov (United States)

    Munoz, Caroline; Huser, Ann

    2008-01-01

    In this article, the authors propose a semester-long experiential-learning project for introductory marketing students. The project requires an analysis of a product category, competition, and consumer base to support a new product proposal. The purpose is to (a) put into practice the concepts and definitions taught in an introductory marketing…

  14. Project Wild and the Dominant Western Paradigm: A Content Analysis Utilizing Deep Ecology.

    Science.gov (United States)

    Ingraham, Blake

    Environmental educators utilize activity guides as a primary method of diffusing environmental education material into educational settings. The most popular environmental education activity guide in use today is Project WILD. Project WILD has come under fire by various groups, especially animal rights groups. Accordingly, a content analysis study…

  15. Bifurcation Tools for Flight Dynamics Analysis and Control System Design Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The purpose of the project is the development of a computational package for bifurcation analysis and advanced flight control of aircraft. The development of...

  16. Summary of work in climate change, pest risk analysis, and biodiversity for Valdivia SANREM project

    OpenAIRE

    Garrett, Karen A.

    2008-01-01

    Metadata only record This presentation summarizes work in climate change, pest risk analysis, and biodiversity for Valdivia SANREM project LTRA-4 (Practices and Strategies for Vulnerable Agro-Ecosystems)

  17. High Performance Flow Analysis and Control Tools for Aerial Vehicles Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of the project is to develop an open architecture, computer aided analysis and control design toolbox for distributed parameter systems, in...

  18. Speciation Analysis of Radionuclides in the Environment - NSK-B SPECIATION project report 2009

    OpenAIRE

    Hou, Xiaolin; Aldahan, Ala; Possnert, Göran; Lujaniene, Galina; Lehto, Jukka; Skipperud, Lindis; Lind, Ole Christian; Salbu, Brit

    2009-01-01

    The second stage of the NKS-B project SPECIATION was complemented in 2008-2009, which mainly focus on three aspects: (1) Further improvement and development of methods for speciation analysis of radionuclides; (2) Investigation of speciation of some radionuclides in the environment (water, sediments, particles); and (3) Intercomparison excise for speciation analysis of radionu-clides in soil and sediment. This report summarizes the work completed in the project partners’ laboratories, Method ...

  19. On the use of risk and uncertainty analysis in conceptual stage of petroleum project

    OpenAIRE

    Supriyadi, Ricky Agus

    2013-01-01

    Several development scenarios are assessed in the conceptual stage of petroleum project. Among all of the alternatives, a scenario will be selected which forms the basis for further detail engineering and project execution. Uncertainties exist during this conceptual stage due to limited information. Therefore, risk and uncertainty analysis is required to review potential benefit and downside of each scenario. The result from this analysis forms a valuable input for decision maker. Hence, appr...

  20. Projections of revenues from CRBRP operation and CRBRP investment analysis

    International Nuclear Information System (INIS)

    The possible revenues from the operation of CRBRP have been projected for a range of pricing scenarios for the sale of its electrical generation output. In order to keep the cases analyzed to a manageable number, the probable highest and lowest electricity price cases appropriate for CRBRP were included so that all other feasible and acceptable arrangements which would produce revenue streams for the CRBRP would be bounded. Other cases selected represent scenarios which could apply to specific utilities within reasonable transmission distance from CRBRP in the surrounding NERC regions

  1. Surface Operations Data Analysis and Adaptation Tool Project

    Data.gov (United States)

    National Aeronautics and Space Administration — This effort undertook the creation of a Surface Operations Data Analysis and Adaptation (SODAA) tool to store data relevant to airport surface research and...

  2. Microfluidic Cytometer for Complete Blood Count Analysis Project

    Data.gov (United States)

    National Aeronautics and Space Administration — We will fabricate and test microfluidic designs for a micro-electromechanical system based complete blood count (CBC) analysis in separate modules and integrate...

  3. Extensible Data Set Architecture for Systems Analysis Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The process of aircraft design requires the integration of data from individual analysis of aerodynamic, structural, thermal, and behavioral properties of a flight...

  4. Development of a Wide-Spectrum Organic Analysis Instrument Project

    Data.gov (United States)

    National Aeronautics and Space Administration — In FY’13 we expanded our analysis of samples to include astromaterials and biological materials relevant to international space station (ISS) and human space...

  5. Microscopic Analysis and Modeling of Airport Surface Sequencing Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The complexity and interdependence of operations on the airport surface motivate the need for a comprehensive and detailed, yet flexible and validated analysis and...

  6. Infrascope: Full-Spectrum Phonocardiography with Automated Signal Analysis Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Using digital signal analysis tools, we will generate a repeatable output from the infrascope and compare it to the output of a traditional electrocardiogram, and...

  7. Simulation Approach to Mission Risk and Reliability Analysis Project

    Data.gov (United States)

    National Aeronautics and Space Administration — It is proposed to develop and demonstrate an integrated total-system risk and reliability analysis approach that is based on dynamic, probabilistic simulation. This...

  8. ATC Operations Analysis via Automatic Recognition of Clearances Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Recent advances in airport surface surveillance have motivated the creation of new tools and data sources for analysis of Air Traffic Control (ATC) operations. The...

  9. Vehicle Interior Noise Prediction Using Energy Finite Element Analysis Project

    Data.gov (United States)

    National Aeronautics and Space Administration — It is proposed to develop and implement a computational technique based on Energy Finite Element Analysis (EFEA) for interior noise prediction of advanced aerospace...

  10. Space Applications for Ensemble Detection and Analysis Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Ensemble Detection is both a measurement technique and analysis tool. Like a prism that separates light into spectral bands, an ensemble detector mixes a signal...

  11. Analysis and Development of UAV Operations in the NAS Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Aurora Flight Sciences, in collaboration with Air Network Simulation and Analysis, Inc. (ANSA), proposes to develop a simulation-based methodology to analyze and...

  12. Parallel Enhancements of the General Mission Analysis Tool Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The General Mission Analysis Tool (GMAT) is a state of the art spacecraft mission design tool under active development at NASA's Goddard Space Flight Center (GSFC)....

  13. Flexible Particle Filter Navigation System for Analysis and Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Odyssey Space Research proposes to develop a modular navigation software package to provide precise state information for offline analysis and real-time...

  14. Propulsion Test Support Analysis with GPU Computing Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The design, development and staging of tests to certify liquid rocket engines usually require high-fidelity structural, fluid and thermal support analysis. These...

  15. Design and Analysis Tools for Deployable Solar Array Systems Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Large, lightweight, deployable solar array structures have been identified as a key enabling technology for NASA with analysis and design of these structures being...

  16. Microscopic Analysis and Modeling of Airport Surface Sequencing Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Although a number of airportal surface models exist and have been successfully used for analysis of airportal operations, only recently has it become possible to...

  17. ATC Operations Analysis via Automatic Recognition of Clearances Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Recent advances in airport surface surveillance have motivated the creation of new tools for analysis of Air Traffic Control (ATC) operations, such as the Surface...

  18. Lesson Learned from AGILE and LARES ASI Projects About MATED Data Collection and Post Analysis

    Science.gov (United States)

    Carpentiero, Rita; Mrchetti, Ernesto; Natalucci, Silvia; Portelli, Claudio

    2012-07-01

    ASI has managed and collected data on project development of two scientific all-Italian missions: AGILE and LARES. Collection of the Model And Test Effectiveness Database (MATED) data, concerning Project, AIV (Assembly Integration and Verification) and NCR (Non Conformance Report) aspects has been performed by the Italian Space Agency (ASI), using available technical documentation of both AGILE e LARES projects. In this paper some consideration on the needs of 'real time' data collection is made, together with proposal of front end improvement of this tool. In addition a preliminary analysis of MATED effectiveness related to the above ASI projects will be presented in a bottom-up and post verification approach.

  19. SI Engine Trends: A Historical Analysis with Future Projections

    Energy Technology Data Exchange (ETDEWEB)

    Pawlowski, Alexander [University of Tennessee, Knoxville (UTK); Splitter, Derek A [ORNL

    2015-01-01

    It is well known that spark ignited engine performance and efficiency is closely coupled to fuel octane number. The present work combines historical and recent trends in spark ignition engines to build a database of engine design, performance, and fuel octane requirements over the past 80 years. The database consists of engine compression ratio, required fuel octane number, peak mean effective pressure, specific output, and combined unadjusted fuel economy for passenger vehicles and light trucks. Recent trends in engine performance, efficiency, and fuel octane number requirement were used to develop correlations of fuel octane number utilization, performance, specific output. The results show that historically, engine compression ratio and specific output have been strongly coupled to fuel octane number. However, over the last 15 years the sales weighted averages of compression ratios, specific output, and fuel economy have increased, while the fuel octane number requirement has remained largely unchanged. Using the developed correlations, 10-year-out projections of engine performance, design, and fuel economy are estimated for various fuel octane numbers, both with and without turbocharging. The 10-year-out projection shows that only by keeping power neutral while using 105 RON fuel will allow the vehicle fleet to meet CAFE targets if only the engine is relied upon to decrease fuel consumption. If 98 RON fuel is used, a power neutral fleet will have to reduce vehicle weight by 5%.

  20. Efficiency Analysis of Project Management Offices for Large-scale Information System Projects: Insights for Construction Megaprojects

    Directory of Open Access Journals (Sweden)

    Joong-Hoon Ko

    2015-08-01

    Full Text Available In this study, the efficiencies of Project Management Offices (PMOs in large-scale information system (IS projects are addressed by using data envelopment analysis. Moreover, the potential improvement levels for each input and output factors of inefficient PMOs are examined. The effects of performance levels of PMO functions on project outcomes with respect to efficiency levels are also analyzed. A total of forty-nine PMOs are analyzed for this study. The result shows that twenty-four PMOs are found to be efficient. As a result of analyzing the impact of efficiency on project performance depending on the functional levels of PMOs, those groups with a high degree of efficiency show higher outcomes compared with the groups with a low degree of efficiency regardless of the functional levels of PMOs. Furthermore, the gap in outcome between the groups with a high degree of efficiency and the groups with a low degree of efficiency is maintained at almost the same level, regardless of the functional levels of PMOs, with the exception of the case of practice management. This indicates that even those groups with a low degree of efficiency could expect high outcomes in terms of schedule and cost compliance if their level of practice management is high.

  1. Designing a Standard Model for Development and Execution of an Analysis Project Plan

    OpenAIRE

    Willis, Leslie T.

    2012-01-01

    Within the Operational Simulation and Analysis (OS and A) branch of the U.S. Army Armament Research, Development, and Engineering Center (ARDEC) at Picatinny Arsenal, there exists no standard model for development and execution of an Analysis Project Plan. A project plan is a formal document which, when agreed upon by parties involved, guides the execution and control of a project. Having such a plan is important to the OS and A branch and ARDEC as a whole because it documents decisions, faci...

  2. COST-BENEFIT ANALYSIS - TOOL FOR ALLOCATION OF FINANCIAL RESOURCES FOR MAJOR PROJECTS

    Directory of Open Access Journals (Sweden)

    EMILIA CLIPICI

    2013-05-01

    Full Text Available The judicious selection of investment projects, at the micro and macro level, with recognition of resource constraints and complementary involvement of the private sector, will lead to sustained economic growth, equitable development, poverty reduction and private sector growth. Cost-Benefit Analysis (CBA estimates and totals up the equivalent money value of the benefits and costs to the community of projects to establish whether they are worthwhile. This research enterprise proposes the study of the advantages of cost-benefit analysis and identify the several major principles that collectively describe the assumption base, objectives, analytical tasks, and merits of this important project assessment methodology.

  3. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2

    International Nuclear Information System (INIS)

    This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment

  4. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    BEVINS, R.R.

    2000-03-24

    This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment.

  5. Personality and personal projects: linking big five and PAC units of analysis.

    Science.gov (United States)

    Little, B R; Lecci, L; Watkinson, B

    1992-06-01

    This article examines the relationships between classical trait units as represented by the five-factor model (e.g., Digman, 1990) and personal action construct (PAC) units as measured by Personal Projects Analysis (Little, 1983). One hundred and forty-seven students were administered the NEO Personality Inventory (Costa & McCrae, 1985) and two components of Personal Projects methodology during their first term in university. Neuroticism and Conscientiousness were related to problematic and positive project systems, respectively, with these effects generalizing across the academic and interpersonal project domains. Extraversion and Agreeableness were also associated with positive evaluations of personal projects, particularly in the interpersonal domain. Openness was distinctively linked with project initiation and value congruency. We suggest theoretical and applied implications of using PAC methods to expand and refine the classical trait research agenda. PMID:1635052

  6. Concealed fault analysis based on the CT projection matrix

    Institute of Scientific and Technical Information of China (English)

    Yang Zhen; Yao Wenli; Ma Liuzhu; Wise Lucas

    2016-01-01

    This paper proposes the concept of projection curves based on the theory of CT image reconstruction to probe the internal structure of the working panel prior to formal mining of the working panel. As well as reducing costs, this method provides safe and efficient excavation of the working panel. According to the results of the numerical model and the actual working panel, the new method has been proven to be accurate in detecting the location of the fault that extends into the face. Concealed faults of the internal working panel, as well as the start and end points of the fault, can be detected by this method. Engineering practice has proven that the method is highly reliable, has a highly decisive impact on faults for coal mining, and can be used to guide the safe mining of the working panel.

  7. Remote-Handled Low Level Waste Disposal Project Alternatives Analysis

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2010-10-01

    This report identifies, evaluates, and compares alternatives for meeting the U.S. Department of Energy’s mission need for management of remote-handled low-level waste generated by the Idaho National Laboratory and its tenants. Each alternative identified in the Mission Need Statement for the Remote-Handled Low-Level Waste Treatment Project is described and evaluated for capability to fulfill the mission need. Alternatives that could meet the mission need are further evaluated and compared using criteria of cost, risk, complexity, stakeholder values, and regulatory compliance. The alternative for disposal of remote-handled low-level waste that has the highest confidence of meeting the mission need and represents best value to the government is to build a new disposal facility at the Idaho National Laboratory Site.

  8. Performance Analysis of XCPC Powered Solar Cooling Demonstration Project

    Science.gov (United States)

    Widyolar, Bennett K.

    A solar thermal cooling system using novel non-tracking External Compound Parabolic Concentrators (XCPC) has been built at the University of California, Merced and operated for two cooling seasons. Its performance in providing power for space cooling has been analyzed. This solar cooling system is comprised of 53.3 m2 of XCPC trough collectors which are used to power a 23 kW double effect (LiBr) absorption chiller. This is the first system that combines both XCPC and absorption chilling technologies. Performance of the system was measured in both sunny and cloudy conditions, with both clean and dirty collectors. It was found that these collectors are well suited at providing thermal power to drive absorption cooling systems and that both the coinciding of available thermal power with cooling demand and the simplicity of the XCPC collectors compared to other solar thermal collectors makes them a highly attractive candidate for cooling projects.

  9. Hydrogen engine performance analysis project. Second annual report

    Energy Technology Data Exchange (ETDEWEB)

    Adt, Jr., R. R.; Swain, M. R.; Pappas, J. M.

    1980-01-01

    Progress in a 3 year research program to evaluate the performance and emission characteristics of hydrogen-fueled internal combustion engines is reported. Fifteen hydrogen engine configurations will be subjected to performance and emissions characterization tests. During the first two years, baseline data for throttled and unthrottled, carburetted and timed hydrogen induction, Pre IVC hydrogen-fueled engine configurations, with and without exhaust gas recirculation (EGR) and water injection, were obtained. These data, along with descriptions of the test engine and its components, the test apparatus, experimental techniques, experiments performed and the results obtained, are given. Analyses of other hydrogen-engine project data are also presented and compared with the results of the present effort. The unthrottled engine vis-a-vis the throttled engine is found, in general, to exhibit higher brake thermal efficiency. The unthrottled engine also yields lower NO/sub x/ emissions, which were found to be a strong function of fuel-air equivalence ratio. (LCL)

  10. A Project Risk Ranking Approach Based on Set Pair Analysis

    Institute of Scientific and Technical Information of China (English)

    Gao Feng; Chen Yingwu

    2006-01-01

    Set Pair Analysis (SPA) is a new methodology to describe and process system uncertainty. It is different from stochastic or fuzzy methods in reasoning and operation, and it has been applied in many areas recently. In this paper, the application of SPA in risk ranking is presented, which includes review of risk ranking, introduction of Connecting Degree (CD) that is a key role in SPA., Arithmetic and Tendency Grade (TG) of CDs, and a risk ranking approach proposed. Finally a case analysis is presented to illustrate the reasonability of this approach. It is found that this approach is very convenient to operate, while the ranking result is more comprehensible.

  11. Risk Analysis an Approach for Safety-related Projects at CERN

    CERN Document Server

    Balda, F

    2001-01-01

    In recent years Risk Analysis has become increasingly important for any kind of project for both personnel and equipment safety assessments. Many divisional projects must respect the rules imposed by the French regulatory authority (INB) and the requirements of applicable international standards. This document proposes a systematic approach for the setting up of a complete Risk Analysis, and it defines coherent steps to be undertaken in order to check the achievement of the project safety goals. Several techniques are discussed, and some ST projects to which they have been applied or are going to be applied are presented. The proposed Risk Analysis structure should be associated and adapted to the different stages of the design and allows the definition of safety requirements; it furthermore traces the guidelines for qualitative and quantitative assessments.

  12. Improving Australia's renewable energy project policy and planning: A multiple stakeholder analysis

    International Nuclear Information System (INIS)

    Renewable Energy (RE) is part of Australia's and the world's energy supply matrix with over A$100 billion spent annually on RE projects since 2007. Businesses seeking to invest in RE projects, particularly in the wind and solar energy sectors, may face an onerous collection of planning approvals and permitting processes that impede investment and implementation. In this study, we draw on international and domestic stakeholder inputs to a governmental inquiry in Australia to show how RE projects might be approved in shortened timeframes with reduced associated costs. The process mapping and stakeholder analysis demonstrates that RE supply projects can benefit from standardized approval processes and documentation, a 360° deep engagement with stakeholders, and expanded electricity grid access in resource areas, augmented through supportive public policy and planning frameworks. In addition, stakeholder objections to project approval and implementation streamlining were used to contrast the efficacy of the proposed changes in policy. -- Highlights: •Highlights the over A$200 billion spent annually on global RE projects. •Describes a typical two stage, multi-layered governance RE project approval process. •Exposes long 3 year and multi-million dollar cost approvals for RE projects. •Identifies multi-million dollar remote grid connections as an RE project impediment. •Outlines RE project policy and guidelines shortcomings and proposed improvements

  13. Groundwater flow analysis of Horonobe underground research laboratory project

    International Nuclear Information System (INIS)

    This report shows the process and the result of the research on the hydrogeological modeling and groundwater flow (GW) analyses of Horonobe Underground Research Laboratory (URL) Project until fiscal year 2004. In the report, Surface-based Investigation (Phase 1) of the project was divided into two phases; the investigation phase based on literature review and the borehole investigation phase. In the investigation phase based on literature review, the sensitivity analyses were carried out with the hydrogeological model built based on the considerable information from the literature review. The results showed that the sensitivities of recharge rate and hydraulic conductivity of the surface layer on hydraulic head and those of hydraulic conductivities of both Wakkanai formation and Koetoi formation on GW migration time were high. The results also showed that the GW flow system in and around the URL area was governed by the Shimizu river and Penke-ebekorobetsu river in the shallower zone (local GW flow system) and the Teshio river in the deeper zone (regional GW flow system). 'Regional scale' analytical domain was defined based on the results. In the borehole investigation phase, the results of both the in-situ hydraulic tests and the laboratory hydraulic tests were summarized as follows: The deeper it was, the lower the hydraulic conductivity was in the same layer, especially in Wakkanai formation. The hydraulic conductivity of the upper layer was lower than that of the lower layer in the same depth. The distribution of hydraulic conductivity was strongly related to that of fracture zone. The GW flow analyses based on newly developed geological model and the results of the hydraulic tests described above were performed. The GW flow analyses were verified by comparing with the measured hydraulic pressures in the boreholes. Besides, the behavior of saline GW was examined. Furthermore, the excavation of the URL shafts and tunnels was simulated. From the results

  14. A new metaphor for projection-based visual analysis and data exploration

    Science.gov (United States)

    Schreck, Tobias; Panse, Christian

    2007-01-01

    In many important application domains such as Business and Finance, Process Monitoring, and Security, huge and quickly increasing volumes of complex data are collected. Strong efforts are underway developing automatic and interactive analysis tools for mining useful information from these data repositories. Many data analysis algorithms require an appropriate definition of similarity (or distance) between data instances to allow meaningful clustering, classification, and retrieval, among other analysis tasks. Projection-based data visualization is highly interesting (a) for visual discrimination analysis of a data set within a given similarity definition, and (b) for comparative analysis of similarity characteristics of a given data set represented by different similarity definitions. We introduce an intuitive and effective novel approach for projection-based similarity visualization for interactive discrimination analysis, data exploration, and visual evaluation of metric space effectiveness. The approach is based on the convex hull metaphor for visually aggregating sets of points in projected space, and it can be used with a variety of different projection techniques. The effectiveness of the approach is demonstrated by application on two well-known data sets. Statistical evidence supporting the validity of the hull metaphor is presented. We advocate the hull-based approach over the standard symbol-based approach to projection visualization, as it allows a more effective perception of similarity relationships and class distribution characteristics.

  15. Sequence analysis and editing for bisulphite genomic sequencing projects

    OpenAIRE

    Carr, IM; Valleley, EMA; Cordery, SF; Markham, AF; Bonthron, DT

    2007-01-01

    Bisulphite genomic sequencing is a widely used technique for detailed analysis of the methylation status of a region of DNA. It relies upon the selective deamination of unmethylated cytosine to uracil after treatment with sodium bisulphite, usually followed by PCR amplification of the chosen target region. Since this two-step procedure replaces all unmethylated cytosine bases with thymine, PCR products derived from unmethylated templates contain only three types of nucleotide, in unequal prop...

  16. Small Explorer project: Submillimeter Wave Astronomy Satellite (SWAS). Mission operations and data analysis plan

    Science.gov (United States)

    Melnick, Gary J.

    1990-01-01

    The Mission Operations and Data Analysis Plan is presented for the Submillimeter Wave Astronomy Satellite (SWAS) Project. It defines organizational responsibilities, discusses target selection and navigation, specifies instrument command and data requirements, defines data reduction and analysis hardware and software requirements, and discusses mission operations center staffing requirements.

  17. Importance of criteria weights in composite appraisal of transport projects – a robustness analysis

    DEFF Research Database (Denmark)

    Jensen, Anders Vestergaard

    2010-01-01

    This paper presents a framework for estimating the robustness of appraisal of transport projects using composite appraisal methodology which makes use of both cost benefit analysis (CBA) and multi criteria analysis (MCA). The setting of criteria weights in MCA is often seen as the most subjective...

  18. On-Line Investment Analysis and Portfolio Management: Using Learning Outcome Statements To Design Projects.

    Science.gov (United States)

    Pettijohn, James B.; Ragan, Gay A.; Ragan, Kent P.

    2003-01-01

    Describes an Internet-based project to familiarize students with online investment analysis and stock portfolio management. Outlines a process for writing learning outcomes that address three levels of cognition: knowledge/comprehension, application/analysis, and synthesis/evaluation. (SK)

  19. Analysis Results for ARRA Projects: Enabling Fuel Cell Market Transformation (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, J.; Wipke, K.; Sprik, S.; Ramsden, T.; Ainscough, C.; Saur, G.

    2012-06-01

    This presentation discusses analysis results for American Recovery and Reinvestment Act early market fuel cell deployments and describes the objective of the project and its relevance to the Department of Energy Hydrogen and Fuel Cells Program; NREL's analysis approach; technical accomplishments including publication of a fourth set of composite data products; and collaborations and future work.

  20. A Principal Component Analysis of Project Management Construction Industry Competencies for the Ghanaian

    Directory of Open Access Journals (Sweden)

    Kamil Omoteso

    2011-03-01

    Full Text Available The study adopts a data reduction technique to examine the presence of any complex structure among a set of project management competency variables. A structured survey questionnaire was administered to 100 project managers to elicit relevant data, and this achieved a relatively high response rate of 54%. After satisfying all the necessary tests of reliability of the survey instrument, sample size adequacy and population matrix, the data was subjected to principal component analysis, resulting in the identification of six new thematic project management competency areas ; and were explained in terms of human resource management and project control; construction innovation and communication; project financial resources management; project risk and quality management; business ethics and; physical resources and procurement management. These knowledge areas now form the basis for lateral project management training requirements in the context of the Ghanaian construction industry. Key contribution of the paper is manifested in the use of the principal component analysis, which has rigorously provided understanding into the complex structure and the relationship between the various knowledge areas. The originality and value of the paper is embedded in the use of contextual-task conceptual knowledge to expound the six uncorrelated empirical utility of the project management competencies.

  1. Project SAPPHIRE uranium-beryllium dose rate analysis

    International Nuclear Information System (INIS)

    During a six-week period in the fall of 1994 a team of 31 US government and Y-12 personnel packaged and removed several thousand kilograms of material containing highly enriched uranium from the (former Soviet Union) Republic of Kazakhstan for interim storage at the Y-12 Plant in Oak Ridge, Tennessee. This classified mission, known as PROJECT SAPPHIRE, had been initiated at the request of the Kazakhstan government in order to rid itself of possible security problems. Planning for the mission included assurance of the health and safety of the team members, as well as compliance with all local, IAEA, and US government regulations regarding the handling, packaging, transportation, and storage of radioactive and fissile material. The mission classification restrictions were relaxed following the return of the team and material to the United States. The material to be removed, in the form of small billets and rods of uranium metal and uranium-beryllium alloy and oxide powder, was sealed by team members on site into two-liter steel cans. Two or three cans each were loaded into more than 400 IAEA certified fissile material shipping container, and each container was packed into a large steel drum for transport by US Air Force cargo planes to the United States

  2. Background analysis and status of the ANAIS dark matter project

    CERN Document Server

    Amaré, J; Cuesta, C; García, E; Ginestra, C; Martínez, M; Oliván, M A; Ortigoza, Y; de Solórzano, A Ortiz; Pobes, C; Puimedón, J; Sarsa, M L; Villar, J A; Villar, P

    2015-01-01

    ANAIS (Annual modulation with NaI Scintillators) is a project aiming to set up at the new facilities of the Canfranc Underground Laboratory (LSC), a large scale NaI(Tl) experiment in order to explore the DAMA/LIBRA annual modulation positive result using the same target and technique. Two 12.5 kg each NaI(Tl) crystals provided by Alpha Spectra took data at the LSC in the ANAIS-25 set-up. The comparison of the background model for the ANAIS-25 prototypes with the experimental results is presented. ANAIS crystal radiopurity goals have been achieved for Th-232 and U-238 chains, but a Pb-210 contamination out-of-equilibrium was identified, whose origin has been studied. The high light collection efficiency obtained with these prototypes allows to anticipate an energy threshold of the order of 1 keVee. A new detector, with improved performances, was received in March 2015 and very preliminary results are shown.

  3. The Soleil project. Reports and analysis of a fight

    International Nuclear Information System (INIS)

    The author reviews the long and winding path that has been followed to get the agreement for the construction of the Soleil synchrotron. This path took more than 10 years after the drawing of the first blueprint describing the synchrotron designed to take over the aging LURE (laboratory for the use of electromagnetic radiation) machine. The Soleil project is born in 1989 in LURE premises, it reached maturity in 1999 when it was stopped by a brutal and unexpected decision from the ministry of research. Stunned by the decision and fully aware of the usefulness of such a machine, the LURE's staff and the scientific community began a fight for the construction of Soleil. This fight took various aspects: regular information meetings, drawing a list of relevant arguments to counter those of the ministry, demonstrations in Paris, petition campaigns, press release... In 2000 a thorough assessment led by the OPECST (parliamentary office for the assessment of scientific and technological choices) recommended the construction of Soleil. The synchrotron was inaugurated in december 2006 by the French president 4 years after the beginning of the construction works. (A.C.)

  4. Work Project Report: Benchmark for 100 Gbps Ethernet network analysis

    CERN Document Server

    Moutidis, Iraklis

    2016-01-01

    During the Long Shutdown 2 (2018-2019) the LHCb experiment will be upgraded in order to reach extremely high precision on the main observable of the b and c-quarks sectors. In its current state the LHCb experiment has a readout rate of 1.1 MHz within a fixed latency, which causes the collision rate to be limited. The removal of this bottleneck is one of the main objectives of the LHCb upgrade. This will be achieved by implementing a trigger-less readout system where the functionality of the trigger will be executed by software. The trigger-less readout system must be able to handle large bandwidth such as 4 TBytes/s. For that reason the design of the system will include readout boards that can transmit information at the rate of 100 Gbits/s and a high throughput local area network [1]. The main goal of my project is to create an automatized benchmark for automatic launching, scheduling and analysing the performance of the readout boards and the network, in order to decide which manufacturer offers the best so...

  5. Work Project Report: Benchmark for 100 Gbps Ethernet network analysis

    CERN Document Server

    Moutidis, Iraklis

    2016-01-01

    During the Long Shutdown 2 (2018-2019) the LHCb experiment will be upgraded in order to reach extremely high precision on the main observable of the b and c-quarks sectors. In its current state the LHCb experiment has a readout rate of 1.1 MHz within a fixed latency, which causes the collision rate to be limited. The removal of this bottleneck is one of the main objectives of the LHCb upgrade. This will be achieved by implementing a trigger-less readout system where the functionality of the trigger will be executed by software. The trigger-less readout system must be able to handle large bandwidth such as 4 TBytes/s. For that reason the design of the system will include readout boards that can transmit information at the rate of 100 Gbits/s and a high throughput local area network [1]. The main goal of my project is to create an automatized benchmark for automatic launching, scheduling and analyzing the performance of the readout boards and the network, in order to decide which manufacturer offers the best so...

  6. Structuring Lecture Videos by Automatic Projection Screen Localization and Analysis.

    Science.gov (United States)

    Li, Kai; Wang, Jue; Wang, Haoqian; Dai, Qionghai

    2015-06-01

    We present a fully automatic system for extracting the semantic structure of a typical academic presentation video, which captures the whole presentation stage with abundant camera motions such as panning, tilting, and zooming. Our system automatically detects and tracks both the projection screen and the presenter whenever they are visible in the video. By analyzing the image content of the tracked screen region, our system is able to detect slide progressions and extract a high-quality, non-occluded, geometrically-compensated image for each slide, resulting in a list of representative images that reconstruct the main presentation structure. Afterwards, our system recognizes text content and extracts keywords from the slides, which can be used for keyword-based video retrieval and browsing. Experimental results show that our system is able to generate more stable and accurate screen localization results than commonly-used object tracking methods. Our system also extracts more accurate presentation structures than general video summarization methods, for this specific type of video. PMID:26357345

  7. UMTRA project water sampling and analysis plan, Naturita, Colorado

    International Nuclear Information System (INIS)

    Surface remedial action is scheduled to begin at the Naturita UMTRA Project processing site in the spring of 1994. No water sampling was performed during 1993 at either the Naturita processing site (NAT-01) or the Dry Flats disposal site (NAT-12). Results of previous water sampling at the Naturita processing site indicate that ground water in the alluvium is contaminated as a result of uranium processing activities. Baseline ground water conditions have been established in the uppermost aquifer at the Dry Flats disposal site. Water sampling activities scheduled for April 1994 include preconstruction sampling of selected monitor wells at the processing site, surface water sampling of the San Miguel River, sampling of several springs/seeps in the vicinity of the disposal site, and sampling of two monitor wells in Coke Oven Valley. The monitor well locations provide sampling points to characterize ground water quality and flow conditions in the vicinity of the sites. The list of analytes has been updated to reflect constituents related to uranium processing activities and the parameters needed for geochemical evaluation. Water sampling will be conducted annually at minimum during the period of construction activities

  8. Risk Analysis of the applied RFID system : Project Stolpen

    OpenAIRE

    Grunzke, Richard

    2007-01-01

    This thesis will be a risk analysis of a RFID-system for a logistical application. The system works as follows: Around Karlstad in Sweden there are three new weighing machines for lorries. The load weight will be measured for the police to control overweight and for logistical reasons such as issuing invoices and optimising the supply chain. The lorries do not have to stop to be weighed. They have to drive slowly over the weighing machine, so the loss of time is minimal. The lorries will be i...

  9. [Alaskan commodities irradiation project: An options analysis study

    International Nuclear Information System (INIS)

    The ninety-ninth US Congress commissioned a six-state food irradiation research and development program to evaluate the commercial potential of this technology. Hawaii, Washington, Iowa, Oklahoma and Florida as well as Alaska have participated in the national program; various food products including fishery products, red meats, tropical and citrus fruits and vegetables have been studied. The purpose of the Alaskan study was to review and evaluate those factors related to the technical and economic feasibility of an irradiator in Alaska. This options analysis study will serve as a basis for determining the state's further involvement in the development of food irradiation technology

  10. Safety analysis for the 233-S decontamination and decommissioning project

    International Nuclear Information System (INIS)

    Decommissioning of the 233-S Plutonium Concentration Facility (REDOX) is a proposed expedited response action that is regulated by the Comprehensive Environmental Response Compensation and Liability Act of 1980 and the Hanford Federal Facility Agreement and Consent Order. Due to progressive physical deterioration of this facility, a decontamination and decommissioning plan is being considered for the immediate future. This safety analysis describes the proposed actions involved in this D ampersand D effort; identifies the radioactive material inventories involved; reviews site specific environmental characteristics and postulates an accident scenario that is evaluated to identify resultant effects

  11. Project Rio Blanco: additional production testing and reservoir analysis

    International Nuclear Information System (INIS)

    Additional subsurface investigations of the Rio Blanco detonation region and adjacent reservoir have been underway since the last technical meeting at IAEA. The lowermost explosion cavity has been reentered and a production test from it was performed. A dry gas volume of 7.6 x 105 m3 (27 Mmscf) was withdrawn. Chemical and radiochemical analyses of this gas show that (1) the yield of the bottom explosive was 31 +- 2 kt; (2) the cavity/chimney volume was 2.4 x 104 m3 (8.4 x 105 ft3); (3) about 7 percent of the tritium produced is associated with the gas; and (4) a slight (approximately 0.1 percent) gas contribution from the middle explosion region was noted. The reservoir/chimney model implies an unstimulated reservoir flow capacity of 0.15 mdarcy-m (0.50 md-ft) connected to the bottom chimney region. A cavity radius of 21 +- 3 m (70 +- 10 ft) was deduced. Unstimulated reservoir production parameters were investigated in a well offset 190 m (625 ft) from the emplacement hole. Insufficient productivity was obtained in the Mesaverde formation (in which the bottom explosive was detonated) to evaluate reservoir properties. The productive sandstones in the Fort Union formation adjoining the top detonation region were individually evaluated. Their aggregate flow capacity was determined to be 0.14 +- 0.2 mdarcy-m (0.45 +- 0.08 md-ft). A numerical simulation model which incorporates these data is described. The lack of a high-permeability connection between the three explosion regions remains unexplained. The two chimney reentry wells have been cemented to the surface and abandoned. The offset well has been plugged in a way which preserves the option for additional subsurface investigation in the future. Project facilities have been removed and the site restored to conditions which minimize environmental impact

  12. FEBEX Project Post-mortem Analysis: Corrosion Study

    Energy Technology Data Exchange (ETDEWEB)

    Madina, V.; Azkarate, I.

    2004-07-01

    The partial dismantling of the FEBEX in situ test was carried out during de summer of 2002, following 5 years of continuous heating. The operation included the demolition of the concrete plug and the removal of the section of the test corresponding to the first heater. A large number of samples from all types of materials have been taken during the dismantling for subsequent analysis. Part of the samples collected were devoted to the analysis of the corrosion processes occurred during the first operational phase of the test. These samples comprised corrosion coupons from different metals installed for that purpose, sensors retrieved during the dismantling that were found severely corroded and bentonite in contact with those sensors. In addition, a corrosion study was performed on the heater extracted and on one section of liner surrounding it. All the analyses were carried out by the Fundacion INASMET (Spain). This report describes, in detail the studies carried out the different materials and the obtained results, as well as the drawn conclusions. (Author)

  13. Hanford Isotope Project strategic business analysis Cesium-137 (Cs-137)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The purpose of this business analysis is to address the beneficial reuse of Cesium 137 (Cs-137) in order to utilize a valuable national asset and possibly save millions of tax dollars. Food irradiation is the front runner application along with other uses. This business analysis supports the objectives of the Department of Energy National Isotope Strategy distributed in August 1994 which describes the DOE plans for the production and distribution of isotope products and services. As part of the Department`s mission as stated in that document. ``The Department of Energy will also continue to produce and distribute other radioisotopes and enriched stable isotopes for medical diagnostics and therapeutics, industrial, agricultural, and other useful applications on a businesslike basis. This is consistent with the goals and objectives of the National Performance Review. The Department will endeavor to look at opportunities for private sector to co-fund or invest in new ventures. Also, the Department will seek to divest from ventures that can more profitably or reliably be operated by the private sector.``

  14. Numerical modelling dam break analysis for water supply project

    International Nuclear Information System (INIS)

    Dam provides many benefits to the society, but it can also cause extensive damage to downstream area when it fails. Dam failure can cause extensive damage to properties and loss of human life due to short warning time available. In general, dam spillway was designed to drain the maximum discharge from the dam during the Probable Maximum Flood (PMF). The spillway is functioned to prevent the dam from failure due to overtopping, which can lead to the dam failure. Dam failure will result in large volume of water travelling at very high velocity to the downstream area of the dam. It can cause extensive property damage, destruction of important facilities, and significant loss of human life along the way. Due to the potential of high hazard it poses to the downstream area, a dam break analysis is considered very essential. This paper focuses into the dam failure analysis for Kahang Dam by prediction of breach flow hydrographs and generation of inundation map at downstream area. From the PMF scenario simulation, the maximum inflow is 525.12 m3/s and peak discharge from the dam during dam failure is 6188m3/s. The results are able to provide information for preparation of Emergency Response Plan (PMF), in which appropriate steps can be taken by relevant authorities to avoid significant loss of human lives.

  15. Hanford Isotope Project strategic business analysis Cesium-137 (Cs-137)

    International Nuclear Information System (INIS)

    The purpose of this business analysis is to address the beneficial reuse of Cesium 137 (Cs-137) in order to utilize a valuable national asset and possibly save millions of tax dollars. Food irradiation is the front runner application along with other uses. This business analysis supports the objectives of the Department of Energy National Isotope Strategy distributed in August 1994 which describes the DOE plans for the production and distribution of isotope products and services. As part of the Department's mission as stated in that document. ''The Department of Energy will also continue to produce and distribute other radioisotopes and enriched stable isotopes for medical diagnostics and therapeutics, industrial, agricultural, and other useful applications on a businesslike basis. This is consistent with the goals and objectives of the National Performance Review. The Department will endeavor to look at opportunities for private sector to co-fund or invest in new ventures. Also, the Department will seek to divest from ventures that can more profitably or reliably be operated by the private sector.''

  16. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification

    International Nuclear Information System (INIS)

    This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope

  17. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    BEVINS, R.R.

    2000-09-20

    This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope.

  18. Joint Implementation Analysis: A Case Study of the Japan-China Coke Dry Quenching (CDQ) Project

    Institute of Scientific and Technical Information of China (English)

    2000-01-01

    One of the key issues for "Joint Implementation" is how to define a plausible baseline, a necessary benchmark for calculating net Greenhouse Gases (GHGs) emission reductions through a comparative approach. Based on a thorough case study of the China-Japan Coke Dry Quenching (CDQ) project, the first approved pilot project in China under the "Activities Implemented Jointly" (AIJ) framework, the paper not only describes in detail the complete procedure of baseline definition of the case project, but also discusses its approach to baseline determination. Furthermore, cost-benefit analysis of GHGs mitigation is conducted according to the baseline. This empirical case study, based on real AIJ project data, will be beneficial for the development of future projects under Kyoto mechanisms such as "Clean Development Mechanism" and "Joint Implementation".

  19. Information Flow Through Stages of Complex Engineering Design Projects: A Dynamic Network Analysis Approach

    DEFF Research Database (Denmark)

    Parraguez, Pedro; Eppinger, Steven D.; Maier, Anja

    2015-01-01

    as those activities are implemented through the network of people executing the project. To address this gap, we develop a dynamic modeling method that integrates both the network of people and the network of activities in the project. We then employ a large dataset collected from an industrial setting......, consisting of project-related e-mails and activity records from the design and development of a renewable energy plant over the course of more than three years. Using network metrics for centrality and clustering, we make three important contributions: 1)We demonstrate a novel method for analyzing...... information flows between activities in complex engineering design projects; 2) we show how the network of information flows in a large-scale engineering project evolved over time and how network analysis yields several managerial insights; and 3) we provide a useful new representation of the engineering...

  20. Analysis of CPN-1 sigma models via projective structures

    International Nuclear Information System (INIS)

    This paper represents a study of projector solutions to the Euclidean CPN-1 sigma model in two dimensions and their associated surfaces immersed in the su(N) Lie algebra. Any solution for the CPN-1 sigma model defined on the extended complex plane with finite action can be written as a raising operator acting on a holomorphic one. Here the proof is formulated in terms rank-1 projectors so it is explicitly gauge invariant. We apply these results to the analysis of surfaces associated with the CPN-1 models defined using the generalized Weierstrass formula for immersion. We show that the surfaces are conformally parametrized by the Lagrangian density, with finite area equal to the action of the model, and express several other geometrical characteristics of the surface in terms of the physical quantities of the model. Finally, we provide necessary and sufficient conditions that a surface be related to a CPN-1 sigma model

  1. Cancer Genome Atlas Pan-cancer Analysis Project

    Directory of Open Access Journals (Sweden)

    Kun ZHANG

    2015-04-01

    Full Text Available Cancer can exhibit different forms depending on the site of origin, cell types, the different forms of genetic mutations which also affect cancer therapeutic effect. Although many genes have been demonstrated to change a direct result of the change in phenotype, however, many cancers lineage complex molecular mechanisms are still not fully elucidated. Therefore, The Cancer Genome Atlas (TCGA Research Network analyzed a large human tumors, in order to find the molecular changes in DNA, RNA, protein and epigenetic level, The results contain a wealth of data provides us with an opportunity for common, personality and new ideas throughout the cancer lineages form a whole description. Pan-cancer genome program first compares the 12 kinds of cancer types. Analysis of different tumor molecular changes and their functions, will tell us how effective treatment method is applied to a similar phenotype of the tumor.

  2. [Cancer Genome Atlas Pan-cancer Analysis Project].

    Science.gov (United States)

    Zhang, Kun; Wang, Hong

    2015-04-01

    Cancer can exhibit different forms depending on the site of origin, cell types, the different forms of genetic mutations which also affect cancer therapeutic effect. Although many genes have been demonstrated to change a direct result of the change in phenotype, however, many cancers lineage complex molecular mechanisms are still not fully elucidated. Therefore, The Cancer Genome Atlas (TCGA) Research Network analyzed a large human tumors, in order to find the molecular changes in DNA, RNA, protein and epigenetic level, The results contain a wealth of data provides us with an opportunity for common, personality and new ideas throughout the cancer lineages form a whole description. Pan-cancer genome program first compares the 12 kinds of cancer types. Analysis of different tumor molecular changes and their functions, will tell us how effective treatment method is applied to a similar phenotype of the tumor. PMID:25936886

  3. The present status of carbon 14 analysis and projects for beryllium 10 analysis at the Tandetron 1 accelerator, Nagoya University

    Energy Technology Data Exchange (ETDEWEB)

    Nakamura, Toshio; Oda, Hirotaka; Ikeda, Akiko; Niu, Etsuko [Nagoya Univ. (Japan)

    2001-02-01

    The operation experience in 1999 of the Tandetron accelerator age estimation system, Nagoya University, is reported, after the overview and the history of the accelerator is briefly described. Total number of carbon 14 environmental samples analyzed was 8567. The project of introducing new HVEE Tandetron for C-14 analysis, and modifying the present GIC Tandetron for Be-10 analysis is presented. Ion source shall be replaced, and the heavy ion detector shall be installed. Projected geological and archaeological studies using Be-10 are enumerated. (A. Yamamoto)

  4. PROJECT MANAGEMENT OF CULTURAL EVENTS IN A PUBLIC UNIVERSITY: ANALYSIS OF PRACTICES AND IMPROVEMENT PROPOSITIONS

    OpenAIRE

    Cláudia Fabiana Gohr; Luciano Costa Santos; Ângela Watte Schwingel,; Edson Talamini

    2013-01-01

    This article aims to describe the management practices used for conducting cultural events adopted by the Department of Culture of a public university, identifying critical points and providing the basis for developing a specific methodology for the organization. The research adopted a qualitative approach of analysis, both to identify practices with those responsible for project management and for conducting a case study of a project undertaken by the institution. For data collection we used...

  5. Decision Support System (DSS) for Construction Project Risk Analysis and Evaluation via Evidential Reasoning (ER)

    OpenAIRE

    Taroun, Abdulmaten

    2012-01-01

    This research explores the theory and practice of risk assessment and project evaluationand proposes novel alternatives. Reviewing literature revealed a continuous endeavourfor better project risk modelling and analysis. A number of proposals for improving theprevailing Probability-Impact (P-I) risk model can be found in literature. Moreover,researchers have investigated the feasibility of different theories in analysing projectrisk. Furthermore, various decision support systems (DSSs) are av...

  6. The Analysis of Several Models of Investment Value of Logistics Project Evaluation

    Directory of Open Access Journals (Sweden)

    Ke Qiu Cheng Zhou

    2013-01-01

    Full Text Available The study of the logistics project evaluation model features reviews the traditional value evaluation model. On the basis of this, using the fuzzy theory, we establish several logistics project evaluation models under fuzzy environment. The analysis of the respective characteristics and the comparison of the calculated results of the three models show that these models are important methods of investment value of logistics evaluation.

  7. A Comparative Analysis of Success by Project Level Characteristics in the Upward Bound Program

    OpenAIRE

    Le, Dat Quang

    2002-01-01

    A Comparative Analysis of Success by Project Level Characteristics in the Upward Bound Program by Dat Q. Le Gabriella Belli, Ph.D., Chair (Abstract) Data gathered by Mathematica Policy Research, Inc., contractor for the Department of Education were used to analyze successful project level characteristics of the Upward Bound program. Mathematica Policy Research, Inc. provided two data files for this study: a student data file and a grantees data file. The first data...

  8. Territorial Distribution Analysis of Projects of the Clean Development Mechanism: The Case of the Mexican States

    OpenAIRE

    Ariel Cruz Ramos; Alfredo Flores Delgado; Homar Zamorano Cervantes; Alejandro Ibarra-Yúnez

    2012-01-01

    This investigation classifies Mexican states according to their strength for attracting clean development mechanism (CDM) projects, as a means to promote economic development from donating Annex I countries of the Kyoto Protocol. We calculated that 46.5 per cent of all CDM projects are concentrated in the states of Jalisco, Coahuila, Puebla, Durango and Veracruz. The study classifies the 32 Mexican states using cluster analysis, based on three dimensions: potential to achieve gas reductions, ...

  9. STUDY OF TRENDS IN THE ANALYSIS OF EXPERTISE IN PROJECT MANAGEMENT THROUGH TECHNICAL BIBLIOMETRICS

    OpenAIRE

    Gustavo Moreira Calixto; Patricia Kuzmenko Furlan; Marly Monteiro de Carvalho

    2012-01-01

    The competency analysis focused on the skills of project management is an issue that has been debated both organizations and academia. This paper aims to conduct a study of the literature on skills within project management. The methodology consisted of the hybrid approach with techniques of bibliometrics and social networks, and search and selection of relevant publications on the basis of ISI Web of Knowledge (Web of Science). The result revealed 147 items aligned to the theme considering t...

  10. Analysis of Projects undertaken by Quantity Surveyors in Lagos State, Nigeria

    OpenAIRE

    Isaac Olaniyi, Aje; Olufisayo Adewumi, Adedokun; Olajide Timothy, Ibironke

    2015-01-01

    1209 Analysis of Projects undertaken by Quantity Surveyors in Lagos State, Nigeria Increasing cost of construction works coupled with insistent collapse of buildings stimulated the investigation of the skills required of the Quantity Surveyors cum their competencies. Due diligence study on the nature of construction projects undertaken were carried out and fifty-eight (58) senior/ associate partners, working in quantity surveying (Qs) firms completed the questionnaires out of Seventy...

  11. Analysis on the choice of the most suitable metal prices in a mining investment project

    International Nuclear Information System (INIS)

    The mineral price assigned in mining project design is critical to determining the economic feasibility of a project. Nevertheless, although it is not difficult to find literature about market metal prices, it is much more complicated to achieve a specific methodology for calculating the value or which justifications are appropriate to include. This study presents an analysis of various methods for selecting metal prices and investigates the mechanisms and motives underlying price selections. The results describe various attitudes adopted by the designers of mining investment project, and how the price can be determined not just by means of forecasting also by consideration of other relevant parameters. (Author)

  12. An associative and projective diagnosis focused on the analysis of statistical databases characteristic of academic education

    OpenAIRE

    Gheorghe Savoiu

    2015-01-01

    The paper presents a distinct manner of statistical analysis, defined by an original associative and projective diagnosis of a set of 10 academic study programmes of the University of Pitesti, generating 244 variables drawn from a larger study that is part of the POSDRU (HRD) contract 156/1.2/G/141632, part of the project known, in its abbreviated form, as NOVA-CURRICULA, a project co-funded by the European Social Fund through the Operational Programme Human Resources Development 2007-2013: “...

  13. Fault tree analysis of Project S-4404, Upgrade Canyon Exhaust System

    International Nuclear Information System (INIS)

    Project S-4404, Upgrade Canyon Exhaust Systems, is a $177 million project with the purpose of upgrading the Exhaust Systems for both F and H Canyon Facilities. This upgrade will replace major portions of the F and H-Canyon exhaust systems, downstream of their respective sand filters with higher capacity and more reliable systems. Because of the high cost, DOE requested Program Control ampersand Integration (PC ampersand I) to examine specific deletions to the project. PC ampersand I requested Nuclear Processes Safety Research (NPSR) to perform an analysis to compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed exhaust system and specific proposed exhaust system alternatives. The objective of this work was to perform an analysis and compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed project exhaust system and proposed project alternatives. Based on fault tree analysis, two conclusions are made. First, D ampersand D activities can be eliminated from the project with no significant decrease to exhaust system safety. Deletion of D ampersand D activities would result in a cost savings of $29 million. Second, deletion of DOE Order 6430.1A requirements regarding DBAs would decrease exhaust system safety by a factor of 12

  14. FEBEX II Project Post-mortem analysis EDZ assessment

    Energy Technology Data Exchange (ETDEWEB)

    Bazargan Sabet, B.; Shao, H.; Autio, J.; Elorza, F. J.

    2004-07-01

    Within the framework of the FEBEX II project a multidisciplinary team studied the mechanisms of creation of the potential damaged zone around the test drift. The research program includes laboratory and in situ investigations as well as the numerical modelling of the observed phenomena. Where laboratory investigations are concerned, the 14C-PMMA technique was applied to study the spatial distribution of porosity in the samples taken from the test drift wall. In addition complementary microscopy and scanning electron microscopy (SEM) studies were performed to make qualitative investigations on the pore apertures and minerals in porous regions. The results obtained with the PMMA method have not shown any clear increased porosity zone adjacent to the tunnel wall. The total porosity of the samples varied between 0.6-1.2%. The samples of unplugged region did not differ from the samples of plugged region. A clear increase in porosity to depths of 10-15 mm from the tunnel wall was detected in lamprophyre samples. According to the SEM/EDX analyses the excavation-disturbed zone in the granite matrix extended to depths of 1-3 mm from the wall surface. A few quartz grains were crushed and some micro fractures were found. Gas permeability tests were carried out on two hollow cylinder samples of about 1m long each taken on the granite wall perpendicular to the drift axis. The first sample was cored in the service area far from the heated zone and the second one at the level of the heater. The tests were performed at constant gas pressure by setting a steady state radial flow through a section of 1cm wide isolated by means of four mini-packers. The profile of the gas permeability according to the core length has been established. The results obtained for both considered samples have shown permeability ranging between 3.5 10-18 and 8.4 10-19m2, pointing out the absence of a marked damage. Acoustic investigations have been carried out with the objective of quantifying the

  15. Supersymmetry Parameter Analysis: SPA Convention andProject

    Energy Technology Data Exchange (ETDEWEB)

    Aguilar-Saavedra, J.A.; Ali, A.; Allanach, B.C.; Arnowitt, R.; Baer, H.A.; Bagger, J.A.; Balazs, C.; Barger, V.; Barnett, M.; Bartl, A.; Battaglia, M.; Bechtle, P.; Belanger, G.; Belyaev, A.; Berger, E.L.; Blair, G.; Boos, E.; Carena, M.; Choi, S.Y.; Deppisch, F.; De Roeck, A.; /Lisbon, IST /DESY /Cambridge U., DAMTP /Texas A-M /Florida State

    2005-12-02

    High-precision analyses of supersymmetry parameters aim at reconstructing the fundamental supersymmetric theory and its breaking mechanism. A well defined theoretical framework is needed when higher-order corrections are included. We propose such a scheme, Supersymmetry Parameter Analysis SPA, based on a consistent set of conventions and input parameters. A repository for computer programs is provided which connect parameters in different schemes and relate the Lagrangian parameters to physical observables at LHC and high energy e{sup +}e{sup -} linear collider experiments, i.e., masses, mixings, decay widths and production cross sections for supersymmetric particles. In addition, programs for calculating high-precision low energy observables, the density of cold dark matter (CDM) in the universe as well as the cross sections for CDM search experiments are included. The SPA scheme still requires extended efforts on both the theoretical and experimental side before data can be evaluated in the future at the level of the desired precision. We take here an initial step of testing the SPA scheme by applying the techniques involved to a specific supersymmetry reference point.

  16. Analysis of soil samples from OMRE decommissioning project

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, O.D.; Chapin, J.A.; Hine, R.E.; Mandler, J.W.; Orme, M.P.; Soli, G.A.

    1979-01-01

    In order to establish that the present Organic Moderated Reactor Experiment (OMRE) site does not exceed the criteria for radioactive contamination, samples obtained from the remainder of the facility that was not removed such as soil, concrete pads, various structural materials, and the leach pond area were analyzed to determine their radioactive content. The results of the analyses performed on soil samples are presented. Results of this study indicate that the activity at the OMRE decommissioned area is confined to localized areas (i.e., the leach pond area and reactor area). Comparisons of radionuclide concentrations measured in soil taken from the lip of the leach pond with concentrations in soil obtained outside the Idaho National Engineering Laboratory (INEL) site boundaries indicate that the concentration in the soil at the edge of the leach pond is at background levels. The vertical augering technique was determined to be the best approach for obtaining shallow soil samples at the INEL. Selection of this technique was based on ease of operation and analytical results. Less area is disturbed per sample than with the horizontal trenching and coring techniques. The radionuclide analysis of the samples shows the existence of a few regions in the reactor and leach pond areas that were still above INEL release criteria. These regions have been or are being further decontaminated.

  17. Decision Process Analysis on Project Priority Strategy: A Case Study of an ICT Design Firm

    Directory of Open Access Journals (Sweden)

    Vincent F. Yu

    2014-01-01

    Full Text Available Project priority strategy is the benchmarking of a corporate operation management strategy and in particular is used by a projects-based research and development firm in the complex competence environment of the information and communication technology (ICT industry. This research takes the variables of external environments and internal resources into account for a firm’s market, technology, and finance assets in order to present a decision process on a project priority strategy. This empirical study also addresses the key factors of the interaction between business on a project development’s supply chain: clients, the examined firm, and suppliers. The findings indicate that a profit-driven project can dominate the firm’s strategic operations and management from the resource-based view and analytic hierarchy process technique perspectives. At the same time, the analysis results contribute significant values to project decision management, which is highly recommended for small-medium enterprises conducting product/project development, project portfolio management, and strategic business management.

  18. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    International Nuclear Information System (INIS)

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical

  19. Analytical Master Plan for the analysis of the data from the electric utility rate demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    1978-06-01

    The Federal Energy Administration (now the US Department of Energy), in cooperation with state public utility commissions and participating utilities, has initiated 16 electric utility rate demonstration projects. The primary purpose of these projects was to evaluate experimentally the effects of time-of-use pricing of electricity for residential customers. The time-of-use rate most frequently employed was a time-of-day (TOD) rate. The method employed by the states to evaluate TOD rates was to select a subset of the residential population, place these people on TOD rates, and with special meters, monitor their temporal use of electricity. As might be expected, with the varying objectives of the states, available resources, and background in load management studies, a variety of approaches were employed, and a variety of data generated by the projects. Also, the received and expected analyses of the data vary considerably among the projects due to the differing interests of the states, available resources, and the composition of the project teams. The three purposes of this Analytical Master Plan (AMP) are: to ensure the data derived from the FEA projects and from related sources are subjected to econometric and statistical analysis that is both rigorous and as highly sophisticated as the state of the art will permit; to ensure that the results of the analysis are organized and displayed in a manner useful to utility and regulatory decision-makers; and to ensure that the analytical effort is conducted on a timely and professional basis. This report identifies the alternative analytical approaches, project specific analyses, project-pooled analyses and organization and management plan for completing the study. Synopses of all the demonstration projects are presented in the appendixes which are bound separately in Volume II.

  20. Project evaluation, sustainability and accountability: combining cost-benefit analysis (CBA) and multi-criteria analysis (MCA)

    OpenAIRE

    Sijtsma, F.J.

    2006-01-01

    General abstract Decision-makers in governments and businesses must choose among different project alternatives which, in varying degrees, contribute to sustainability. Decision-makers also have to account for their choices to a large audience or a broad range of stakeholders. This thesis is about the positive and negative aspects of using the main judgement-oriented evaluation tools of Cost-Benefit Analysis (CBA) and Multi Criteria Analysis (MCA) together in the context of sustainability and...

  1. Measuring efficiency of lean six sigma project implementation using data envelopment analysis at Nasa

    Directory of Open Access Journals (Sweden)

    David Meza

    2013-06-01

    Full Text Available Purpose: This study aims to review the implementation of the Lean Six Sigma project methodology in the Johnson Space Center (JSC business environment of National Aeronautics and Space Administration (NASA with an objective of evaluating performance of individual projects and to develop recommendation for strategies to improve operational efficiencies based on Data Envelopment Analysis (DEA.Design/methodology/approach: In this study, authors propose the Lean Six Sigma project performance evaluation model (LSS-PPEM based on Data DEA where Critical Success Factors (CSFs and Total Team Hours serve as inputs while Process Sigma and Cost avoidance are used as outputs. The CSFs are factors that critically affect the performance of LSS at JSC. Six of those are identified by the Black Belts through Analytical Hierarchical Process, and the values of those are decided by project leaders and Green Belts through survey. Eighteen LSS projects are evaluated, and their results are analyzed.Findings and Originality/value: Eventually, four out of the six CSFs are adopted for this study based upon Pearson correlation analysis, and those four include Project execution and follow up of results; Top management’s commitment and participation; The use of data analysis with easily obtainable data; Attention given to both long and short term targets. Using data between the years 2009 and 2011, seven of the eighteen projects are found to be efficient. The benchmark analysis and slack analysis are conducted to provide further recommendation for JSC managers. Three out of those seven efficient projects are most frequently used as an efficient peer.Practical implications: Traditionally, DEA has been considered as a data-driven approach. In this study, authors incorporate the survey-based CSFs into the DEA frame. Since many organizations may have different CSFs, the framework presented in this study can be easily applied to other organizations.Originality/value: This study

  2. Application and importance of cost-benefit analysis in energy efficiency projects implemented in public buildings: The case of Serbia

    OpenAIRE

    Đurovic Dejan M.; Obradovic Vladimir Lj.; Vuckovic Aleksandar M.; Mihic Marko M.; Petrovic Dejan C.

    2012-01-01

    The main objective of this paper is to present the advantages of using Cost-Benefit analysis in energy efficiency projects implemented in public buildings, and to prove the hypothesis that Cost-Benefit analysis boosts the effectiveness and efficiency of the said type of projects. The paper offers theoretical and practical explanation of the implementation of Cost-Benefit analysis in the relevant area. Since energy efficiency projects in public buildings usually represent a part of a bro...

  3. Six sigma project selections using fuzzy network-analysis and fuzzy MADM

    Directory of Open Access Journals (Sweden)

    Hassan Farsijani

    2015-01-01

    Full Text Available Six Sigma is a philosophy of unremitting improvement and excellence in all aspects. The concept is a satisfactory modification process tool through customers, continuous improvement and stakeholder participation. Six Sigma is considered as statistical analysis, assessment scales and customer-oriented production accomplishments and it leads to defect production reduction. This paper recommends an approach to select Six Sigma projects using fuzzy multiple attribute decision making techniques composed with another concoction tool. Through insightful quarrying of literature, rudimentary criteria for selecting Six Sigma projects were revealed. The fundamental criteria were identified consuming the fuzzy hypothesis test. Having identified the most indispensable criteria, the weight of criteria were determined. Appling FANP techniques. Having calculated the weights pertinent to criteria through three methods, SAW, TOPSIS, and Fuzzy VIKOR, Six Sigma projects were introduced and prioritized. Applying the three methods engendered various results, which required the application of an amalgamation technique, entitled as Borda and it helped to clarify the final project rate.

  4. Project management in mine actions using Multi-Criteria-Analysis-based decision support system

    Directory of Open Access Journals (Sweden)

    Marko Mladineo

    2014-12-01

    Full Text Available In this paper, a Web-based Decision Support System (Web DSS, that supports humanitarian demining operations and restoration of mine-contaminated areas, is presented. The financial shortage usually triggers a need for priority setting in Project Management in Mine actions. As part of the FP7 Project TIRAMISU, a specialized Web DSS has been developed to achieve a fully transparent priority setting process. It allows stakeholders and donors to actively join the decision making process using a user-friendly and intuitive Web application. The main advantage of this Web DSS is its unique way of managing a mine action project using Multi-Criteria Analysis (MCA, namely the PROMETHEE method, in order to select priorities for demining actions. The developed Web DSS allows decision makers to use several predefined scenarios (different criteria weights or to develop their own, so it allows project managers to compare different demining possibilities with ease.

  5. Technical Analysis of Projects Being Funded by the DOE Hydrogen Program

    Energy Technology Data Exchange (ETDEWEB)

    Edward G. Skolnik

    2006-02-10

    In July 2000, Energetics began a project in which we performed site-visit based technical analyses or evaluations on hydrogen R&D projects for the purpose of providing in-depth information on the status and accomplishments of these projects to the public, and especially to hydrogen stakeholders. Over a three year period, 32 site-visit analyses were performed. In addition two concepts gleaned from the site visits became subjects of in depth techno-economic analyses. Finally, Energetics produced a compilation document that contains each site-visit analysis that we have performed, starting in 1996 on other contracts through the end of Year One of the current project (July 2001). This included 21 projects evaluated on previous contracts, and 10 additional ones from Year One. Reports on projects visited in Years One and Two were included in their respective Annual Reports. The Year Two Report also includes the two In-depth Analyses and the Compilation document. Reports in Year three began an attempt to perform reviews more geared to hydrogen safety. This Final Report contains a summary of the overall project, all of the 32 site-visit analyses and the two In-depth Analyses.

  6. Benefit–cost analysis of non-marginal climate and energy projects

    International Nuclear Information System (INIS)

    Conventional benefit–cost analysis incorporates the normally reasonable assumption that the policy or project under examination is marginal. Among the assumptions this entails is that the policy or project is small, so the underlying growth rate of the economy does not change. However, this assumption may be inappropriate in some important circumstances, including in climate-change and energy policy. One example is global targets for carbon emissions, while another is a large renewable energy project in a small economy, such as a hydropower dam. This paper develops some theory on the evaluation of non-marginal projects, with empirical applications to climate change and energy. We examine the conditions under which evaluation of a non-marginal project using marginal methods may be wrong, and in our empirical examples we show that both qualitative and large quantitative errors are plausible. - Highlights: • This paper develops the theory of the evaluation of non-marginal projects. • It also includes empirical applications to climate change and energy. • We show when evaluation of a non-marginal project using marginal methods is wrong

  7. Elemental and Chemical State Analysis, XPS, for In-Situ Materials Analysis on Mars Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective in this project is the development of a monochromatic x-ray source for a small x-ray Photoelectron Spectrometer (XPS) suitable for NASA missions. This...

  8. MONTE CARLO SIMULATION APPLIED TO ECONOMIC AND FINANCIAL ANALYSIS OF AN AGRIBUSINESS PROJECT

    OpenAIRE

    Danilo Simões; Lucas Raul Scherrer

    2014-01-01

    In practice, all management decisions involving an organization, regardless of size, have uncertainties which lead to different levels of risk. Monte Carlo simulation allows risk analysis by designing probabilistic models. From a deterministic model of economic viability indicators, commonly used for decision investment projects, it was developed a probabilistic model with Monte Carlo method simulations in order to carry out economic and financial analysis of an agroindustrial ...

  9. Does risk management contribute to IT project success? A meta-analysis of empirical evidence

    NARCIS (Netherlands)

    de Bakker, K.F.C.; Boonstra, A.; Wortmann, J.C.

    2010-01-01

    The question whether risk management contributes to IT project success is considered relevant by people from both academic and practitioners' communities already for a long time. This paper presents a meta-analysis of the empirical evidence that either supports or opposes the claim that risk managem

  10. Substituted plan analysis in the environmental impact assessment of Yongchuan wastewater treatment project

    Institute of Scientific and Technical Information of China (English)

    FANG Jun-hua

    2006-01-01

    Substituted plan in the environmental impact assessment (EIA) mainly means the treatment technology and the substituted site of plant, and it also includes the many kinds of environment protection measures. This paper will make detailed analysis on the treatment technology, the substituted site of plant, the purpose of discharged water and the dispose of sludge in the Yongchuan wastewater treatment project.

  11. Technology Outlook for Australian Tertiary Education 2013-2018: An NMC Horizon Project Regional Analysis

    Science.gov (United States)

    Johnson, L.; Adams Becker, S.; Cummins, M.; Freeman, A.; Ifenthaler, D.; Vardaxis, N.

    2013-01-01

    The "Technology Outlook Australian Tertiary Education 2013-2018: An NMC Horizon Project Regional Analysis" reflects a collaborative research effort between the New Media Consortium (NMC) and Open Universities Australia to help inform Australian educational leaders about significant developments in technologies supporting teaching,…

  12. Civil Rights Project's Response to "Re-Analysis" of Charter School Study

    Science.gov (United States)

    Civil Rights Project / Proyecto Derechos Civiles, 2010

    2010-01-01

    The Civil Rights Project (CRP) was founded, in part, to bring rigorous social science inquiry to bear on the most pressing civil rights issues. On-going trends involving public school segregation have been a primary focus of the CRP's research, and the expanding policy emphasis on school choice prompted analysis of the much smaller--but…

  13. UMTRA Project water sampling and analysis plan, Salt Lake City, Utah. Revision 1

    International Nuclear Information System (INIS)

    This water sampling and analysis plan describes planned, routine ground water sampling activities at the US Department of Energy Uranium Mill Tailings Remedial Action Project site in Salt Lake City, Utah. This plan identifies and justifies sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring of ground water, sediments, and surface waters at monitoring stations on the site

  14. Spent nuclear fuel project - criteria document spent nuclear fuel final safety analysis report

    International Nuclear Information System (INIS)

    The criteria document provides the criteria and planning guidance for developing the Spent Nuclear Fuel (SNF) Final Safety Analysis Report (FSAR). This FSAR will support the US Department of Energy, Richland Operations Office decision to authorize the procurement, installation, installation acceptance testing, startup, and operation of the SNF Project facilities (K Basins, Cold Vacuum Drying Facility, and Canister Storage Building)

  15. Finite-time analysis of global projective synchronization on coloured networks

    Indian Academy of Sciences (India)

    Cai Guoliang; Jiang Shengqin; Cai Shuiming; Tian Lixin

    2016-03-01

    A novel finite-time analysis is given to investigate the global projective synchronization on coloured networks. Some less conservative conditions are derived by utilizing finite-time control techniques and Lyapunov stability theorem. In addition, two illustrative numerical simulations are provided to verify the effectiveness of the proposed theoretical results.

  16. 360-Degree Rhetorical Analysis of Job Hunting: A Four-Part, Multimodal Project

    Science.gov (United States)

    Ding, Huiling; Ding, Xin

    2013-01-01

    This article proposes the use of a four-component multimodal employment project that offers students a 360-degree understanding of the rhetorical situations surrounding job searches. More specifically, we argue for the use of the four deliverables of written resumes and cover letters, mock oral onsite interview, video resume analysis, and peer…

  17. On Power Relation in the Design of Language Research Project and the Analysis of Data

    Science.gov (United States)

    Zhang, Wei

    2009-01-01

    How to deal with the relationship between the researcher and the "researched" is a crucial thing in design of a language research project and the analysis of data. The paper mainly focuses the influence of power relations between the researcher and the "researched" people. To do social research "on, for and with" the…

  18. Regular High School education in focus: t he analysis of the Institutional Educational Development Project (PDPI

    Directory of Open Access Journals (Sweden)

    Valéria Moreira Rezende

    2012-01-01

    Full Text Available Set under the perspective of school culture studies, this research focuses on high school education inserted under the process of implementation of a quality program. This article aims at investigating what is conceived as regular high school quality in the extent of state public education of Minas Gerais, on the process of implementation of the Institutional Educational Development Project (Projeto de Desenvolvimento Pedagógico Institucional – PDPI as part of the Reference Schools Project (Projeto Escolas-Referência – PER instituted by the government of Minas Gerais. This research has taken as scope two public schoo from the countryside of the State of Minas Gerais, which have presented conceptions about education quality connected to the way they have received and implemented the project. School is therefore understood as a self-organized instance towards the production of formal and informal rules, which are peculiar to social organizations. Under this point of view, school is seen on the range of social contradictions that sometimes hamper, and other times promote the educational project. The research has included the following proceedings: documentary analysis, interviews, observation. Through the analysis, it was clear that the school and its subjects confronted a series of mismanagements on the implementation of the PDPI, which turned the dreamed school into a nightmare. The results have revealed that the dream is undone before a project that rhetorically proposes itself to redeem “education quality” when that is still undefined.

  19. HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT INCREASED LIQUID LEVEL ANALYSIS FOR 241-AP TANK FARMS

    Energy Technology Data Exchange (ETDEWEB)

    MACKEY TC; DEIBLER JE; JOHNSON KI; PILLI SP; KARRI NK; RINKER MW; ABATT FG; CARPENTER BG

    2007-02-16

    The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the SDT System at Hanford. The "Double-Shell Tank (DST) Integrity Project - DST Thermal and Seismic Project" is in support of Tri-Party Agreement Milestone M-48-14.

  20. Hanford Double-Shell Tank (DST) Thermal and Seismic Project-Increased Liquid Level Analysis For 241-AP Tank Farms

    International Nuclear Information System (INIS)

    The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the SDT System at Hanford. The 'Double-Shell Tank (DST) Integrity Project - DST Thermal and Seismic Project' is in support of Tri-Party Agreement Milestone M-48-14.

  1. ANALYSIS OF THE INCREASE OF CONSTRUCTION COSTS IN URBAN REGENERATION PROJECTS

    Directory of Open Access Journals (Sweden)

    Magdalena Apollo

    2015-11-01

    Full Text Available The subject of this paper is the analysis and evaluation of the reasons for construction costs increases in urban regeneration projects. The analysis considers major refurbishments of real estates’, as well as heavy repair and modernization of the road system. For the period mentioned, the costs from works and expenditure schedules were compared with the costs of additional works, which shows the percentage cost increase in relation to initial project budget assumptions of the case study. The analysis revealed that due to difficulties in assessing technical state of inhabited buildings, the investor and potential contractor should pay special attention to the character of issues presented in this paper, taking into account an increased risk of their occurrence.

  2. C.2 analysis of the environmental effects of the Nuclear Facilities Modernization project

    International Nuclear Information System (INIS)

    This analysis indicates that the potential impacts associated with the current/projected Mound tritium operations are adequately bounded by the existing environmental impacts analyzed in the FEIS. It also indicates that the incremental impacts of the NFM project will make a positive contribution to the overall impact of current/projected tritium operations. Except for minor and normal temporary conditions during the construction and demolition phases, the NFM project would measurably reduce the likelihood of adverse consequences to the environment. Relocation of the PE/PD laboratory operations from the SW/R Tritium Complex to the T Building will place these operations in a safer, state-of-the-art glovebox systems. Through the utilization of modern laboratory equipment and enhanced containment, the project will reduce the quantity of routine airborne tritium releases and volume of solid tritiated wastes resulting from routine PE/PD laboratory operations. The increased reliance placed on engineered safety aspects and stronger mitigative measures by the project will also reduce the risk associated with these operations by reducing both the probability and consequences of unusual occurrences involving uncontrolled tritium releases

  3. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    Directory of Open Access Journals (Sweden)

    Irhan Febijanto

    2013-12-01

    Full Text Available Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from carbon market to increase the economic feasibility. Procedure to register the project to United Nation for Climate Change Convention (UNFCCC as a Clean Development Mechanism project was explained in detail. Approved Consolidation Methodology (ACM 0002 Version 12.3.0 was used to calculate grid emission factor in Jawa-Bali-Madura the grid electricity system. It was calculated that the grid emission factor is 0.833 (t-CO2/MWh, and the carbon emission reduction generated for this project is 21,982 ton/year. From the analysis result, it can be proven that the additional revenue from carbon credit could increase the project IRR from 10.28% to 13.52%.

  4. A grounded theory approach to the analysis of sermons on poverty: Congregational projects as social capital

    Directory of Open Access Journals (Sweden)

    Hennie J.C. Pieterse

    2012-02-01

    Full Text Available This article reported on the second cycle (selective coding of grounded theory research of sermons on poverty in the South African context, with Matthew 25:31�46 as the sermon text. The problem which the author was researching pertained to the question: How do congregations in the Dutch Reformed Church (Nederduitse Gereformeerde Kerk and the Uniting Reformed Church handle the care for the poor in practice? A theoretical sample of congregations with outreach projects to the poor and humble was drawn. After the analysis of the sermons was conducted, the next question to be addressed was: What are the categories and properties of the projects by congregations as the how of the care for the poor? New thinking on the issue of preaching on poverty is necessary because homiletic literature in this field of preaching does not address the how question. The author therefore described a theoretical framework for the interpretation of the projects, as well as an anthropological view of the communication occurring on an equal footing, with the givers in the projects functioning as social capital and the receivers (the poor and humble as the participants with their own responsibility and freedom. The classification of the projects in categories showed that a wide variety of different types of projects to the poor have emerged from the sermons.

  5. Impact Analysis of Coastal Engineering Projects on Mangrove Wetland Area Change with Remote Sensing

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    In the past decades, two large scale coastal engineering projects have been carried out in the Deep Bay surrounded by Shenzhen City and Hong Kong Special Administrative Region. One project is Shenzhen River channel regulation and the other is the sea reclamation along the seashore on the Shenzhen side. The two projects are very close to the two national nature reserves, specifically Futian in Shenzhen and Mai Po in Hong Kong, which are important wetland ecosystems worldwide. This paper aims to identify and monitor the mangrove wetland changes with time series of Landsat Thematic Mapper images pre and post to the two engineering projects being launched. Coupled analysis of the image interpretation results and tidal data acquired at the same time in the context of the two works reveals that the mangrove wetland area has increased from year 1989 to 1994, and has changed little from year 1994 to 2002. Binary coding is applied to reveal the distribution image of mangrove at each phase, and the coding image shows that the construction of the two coastal engineering projects has caused frequent changes in mangrove spatial distribution. The study also shows that the change is not significant regarding to the precision of the method and the natural evolution of mangrove wetland, and the projects do not cause apparently influences upon the two national mangrove conservation zones at least for the research time period.

  6. Topic Analysis project in CS5604, Spring 2016: Extracting Topics from Tweets and Webpages for IDEAL

    OpenAIRE

    Mehta, Sneha; Vinayagam, Radha Krishnan

    2016-01-01

    This submission includes the project report, final presentation, LDA code, test datasets and its results. In the compressed folder, "TopicAnalysis-code.zip", we have included the LDA Scala source code (lda_v1.scala) for processing Tweets and a JAR file for web page analysis. The compressed folder, "TopicAnalysis-TestData&Results.zip" contains cleaned Tweet collections and web pages from the Obamacare collection. In the same folder, we have also included the topic results for each collection a...

  7. Electric Propulsion Requirements and Mission Analysis Under NASA's In-Space Propulsion Technology Project

    Science.gov (United States)

    Dudzinski, Leonard a.; Pencil, Eric J.; Dankanich, John W.

    2007-01-01

    The In-Space Propulsion Technology Project (ISPT) is currently NASA's sole investment in electric propulsion technologies. This project is managed at NASA Glenn Research Center (GRC) for the NASA Headquarters Science Mission Directorate (SMD). The objective of the electric propulsion project area is to develop near-term and midterm electric propulsion technologies to enhance or enable future NASA science missions while minimizing risk and cost to the end user. Systems analysis activities sponsored by ISPT seek to identify future mission applications in order to quantify mission requirements, as well as develop analytical capability in order to facilitate greater understanding and application of electric propulsion and other propulsion technologies in the ISPT portfolio. These analyses guide technology investments by informing decisions and defining metrics for technology development to meet identified mission requirements. This paper discusses the missions currently being studied for electric propulsion by the ISPT project, and presents the results of recent electric propulsion (EP) mission trades. Recent ISPT systems analysis activities include: an initiative to standardize life qualification methods for various electric propulsion systems in order to retire perceived risk to proposed EP missions; mission analysis to identify EP requirements from Discovery, New Frontiers, and Flagship classes of missions; and an evaluation of system requirements for radioisotope-powered electric propulsion. Progress and early results of these activities is discussed where available.

  8. The Analysis of the Components of Project-Based Learning on Social Network

    Directory of Open Access Journals (Sweden)

    Kuntida Thamwipat

    2012-12-01

    Full Text Available This research aims to analyze the components of project based learning on social network, case study of presentation skill course. The study was carried out with 98 representatives of 2nd– 3rdyear students of EducationalCommunications and Technology Department, 2ndsemester, academic year 2554, who was studying ETM 205 Presentation Skill. 5 point-rating scale questionnaire was used as the research tool for data collection for analyzing the obtained data which has the reliability as 0.94 and using the mean, Standard Deviation (S.D., factor analysis, varimax method in data analysis. The results can be concluded as follows: Ten components of project based learning on social network, case study of Presentation Skill course was divided into 3 steps following Ministry of Education’s framework as follows: 1 Pre-Project Stage consists of the 3rdcomponent: The introduction of presentation skill and sharing ideas through social network, the 5thcomponent: The learner preparation of pre-project stage, the 9thcomponent: Writing the schemes and skills development training and the 10thcomponent: The presentation skill training in group and individual 2 While / During-Project Stage consists of The 2ndcomponent: Roles and responsibilities during project stage and communication, the 6thcomponent: Readiness of performing duties of individual or group of people which communicate through social network and the 8thcomponent: Guidance and agreement which learner submit voluntarily 3 Post-Project Stage consists of the 1stcomponent: Evaluations, document management system, presentation, the 4thcomponent: Instructor evaluation, feedback, congratulations to learners who achieve successful project and the 7thcomponent: Multi-channel evaluation by regression equation or forecast equation concerning the analysis of the components of project learning management on social network, results as below:Y = .780(Factor 1 + .603(Factor 2 + .686(Factor 3 + .591(Factor 4 + .741

  9. Analysis of central enterprise architecture elements in models of six eHealth projects.

    Science.gov (United States)

    Virkanen, Hannu; Mykkänen, Juha

    2014-01-01

    Large-scale initiatives for eHealth services have been established in many countries on regional or national level. The use of Enterprise Architecture has been suggested as a methodology to govern and support the initiation, specification and implementation of large-scale initiatives including the governance of business changes as well as information technology. This study reports an analysis of six health IT projects in relation to Enterprise Architecture elements, focusing on central EA elements and viewpoints in different projects. PMID:25160162

  10. Shape analysis of mirrors for Pierre Auger Project using Ronchi test

    Czech Academy of Sciences Publication Activity Database

    Mandát, Dušan; Nožka, Libor; Hrabovský, Miroslav; Pech, Miroslav

    Sibiu : University "Lucian Blaga" of Sibiu and ARTENS, 2007 - (Pastrav, I.), s. 81-82 ISBN 978-973-739-456-9. [Danubia-Adria symposium of developments in experimental mechanics /24./. Sibiu (RO), 19.09.2007-22.09.2007] R&D Projects: GA MŠk(CZ) 1M06002; GA AV ČR KAN301370701 Institutional research plan: CEZ:AV0Z10100522 Keywords : shape analysis * mirrors * Pierre Auger Project * Ronchi test Subject RIV: BH - Optics, Masers, Lasers

  11. A COMPARISON OF STEPWISE AND FUZZY MULTIPLE REGRESSION ANALYSIS TECHNIQUES FOR MANAGING SOFTWARE PROJECT RISKS: ANALYSIS PHASE

    OpenAIRE

    Abdelrafe Elzamly; Burairah Hussin

    2014-01-01

    Risk is not always avoidable, but it is controllable. The aim of this study is to identify whether those techniques are effective in reducing software failure. This motivates the authors to continue the effort to enrich the managing software project risks with consider mining and quantitative approach with large data set. In this study, two new techniques are introduced namely stepwise multiple regression analysis and fuzzy multiple regression to manage the software risks. Two evaluation proc...

  12. Analysis expectation of investment projects in the conditions of maintenance of investment security companies: probabilistic approach

    Directory of Open Access Journals (Sweden)

    G.V. Berlyak

    2015-06-01

    Full Text Available Uncertainty in making investment and financial decisions arises both because there are many alternatives that can select an investor, and through him the uncontrollable state of the environment at the time of implementation of the decision. One of the stages of the economic analysis is the study now necessary volume of investment resources, possibly based on the analysis of performance indicators of investment security. Indicative analysis of investment security of the enterprise affect the size of the expectation of the realization of the investment project. It asked to rank performance given set of blocks and for each factor of influence on the state of expectations. Each of the proposed indicators of investment security value awarded, the amount of which, in compliance with established standards Raven 1. This means that the investor as a result of the investment project will receive the whole amount of the expectations. If at least one performance indicators does not meet the proposed standard, the amount of expectations reduced in proportion to the coefficient of influence. Based on the study the technique of reflection of financial and economic condition of the enterprise in terms of the analysis of performance indicators of investment security, in varying degrees, to judge the financial health of the enterprise and the availability of capital for current and future development, and to repay its debts, liabilities and also the possibility of realization of the investment project.

  13. PREPS2 - a PC-based computer program for performing economic analysis of capital projects

    International Nuclear Information System (INIS)

    In these times of increased spending to finance new capacity and to meet clean air act legislation, many electric utilities are giving a high priority to controlling capital expenditures at existing generating facilities. Determining the level of capital expenditures which are economically justified is very difficult; units which have higher capacity factors are worth more to the utility. Therefore, the utility can more readily justify higher capital expenditures to improve or maintain reliability and heat rate than on units with lower capacity factors. This paper describes a PC-based computer program (PREPS2) which performs an economic analysis of individual capital projects. The program incorporates tables which describe the worth to the system of making improvements in each unit. This computer program is currently being used by the six Southern Company operating companies to evaluate all production capital projects over $50,000. Approximately 500 projects representing about $300 million are being analyzed each year

  14. Low-Level Waste Vitrification Plant Project contracting strategy decision analysis report

    International Nuclear Information System (INIS)

    Ten basic contracting strategies were developed after a review of past strategies that had been used at the Hanford Site, other US Department of Energy (DOE) sites, other US government agencies, and in the private sector. As applicable to the Low-Level Waste Vitrification Plant (LLWVP) Project, each strategy was described and depicted in a schedule format to assess compatibility with the Hanford Federal Facility Agreement and Consent Order, al so known as the Tri-Party Agreement (Ecology et al. 1994) milestones, key decision points, and other project requirements. The-pro and con aspects of each strategy also were tabulated. Using this information as a basis, the LLWVP Project team members, along with representatives of Tank Waste Remediation System (TWRS) Engineering, TWRS Programs, and Procurement Materials Management, formed a Westinghouse Hanford Company (WHC) evaluation team to select the best strategy. Kepner-Tregoe decision analysis techniques were used in facilitated meetings to arrive at the best balanced choice

  15. Analysis of energy consumption, indoor climate, occupant satisfaction and overall evaluation of the project

    DEFF Research Database (Denmark)

    Zanghirella, Fabio; Thomsen, Kirsten Engelund; Knudsen, Henrik Nellemose;

    . Deliverable 23 Deliverable 23 is a deliverable produced as part of the final reporting of the project. It is meant to provide an overview of energy consumption analysis, indoor climate and occupants satisfaction investigations and an overall evaluation of the project. The distribution is public.......The idea of the project CLASS 1 is to use the strengthening of the energy requirements to boost and drive the technological developments and to prove the economic and environmental benefits of ultra-low energy buildings (50% below the new requirements in the Danish building regulations) integrated...... with biomass- and solar heating based renewable energy supply. In this context the objectives are to: 1. Optimise the integration of low-energy building technologies with supply (renewable and conventional) and distribution (heating and electricity) technologies. 2. Advance selected technologies within...

  16. Sensitivity analysis of socio-economic values of time for public transport projects

    DEFF Research Database (Denmark)

    Andersen, Jonas Lohmann Elkjær; Landex, Alex; Nielsen, Otto Anker

    2007-01-01

    The socio-economic time benefits of two light rail projects in Copenhagen are investigated using three different sets of values of time. The first set is the one the Ministry of Transport recommends for use in socio-economic analysis in Denmark; this is used as basis for comparison with the two...... other sets of values of time. The second set is the expected new recommended values of time that has the same time values for non-business travel. The third set is estimated from traffic modelling parameters and operates with different in-vehicle time values; the reason for this is thoroughly described...... supported by examples. Traffic modelling of the two light rail projects has been performed and the results are used to generate the time benefits. The time benefits for the two light rail projects using the expected new values of time will increase around 20% compared to the result when using the values...

  17. UMTRA project water sampling and analysis plan, Naturita, Colorado. Revision 1

    International Nuclear Information System (INIS)

    Planned, routine ground water sampling activities for calendar year 1995 to 1997 at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Naturita, Colorado, are described in this water sampling and analysis plan. The following plan identifies and justifies the sampling locations, analytical parameters, detection limits, sampling frequency, and specific rationale for each routine monitoring station at the site. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site

  18. Job task and functional analysis of the Division of Reactor Projects, office of Nuclear Reactor Regulation. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Morzinski, J.A.; Gilmore, W.; Hahn, H.A.

    1998-07-10

    A job task and functional analysis was recently completed for the positions that make up the regional Divisions of Reactor Projects. Among the conclusions of that analysis was a recommendation to clarify roles and responsibilities among site, regional, and headquarters personnel. As that analysis did not cover headquarters personnel, a similar analysis was undertaken of three headquarters positions within the Division of Reactor Projects: Licensing Assistants, Project Managers, and Project Directors. The goals of this analysis were to systematically evaluate the tasks performed by these headquarters personnel to determine job training requirements, to account for variations due to division/regional assignment or differences in several experience categories, and to determine how, and by which positions, certain functions are best performed. The results of this analysis include recommendations for training and for job design. Data to support this analysis was collected by a survey instrument and through several sets of focus group meetings with representatives from each position.

  19. Task analysis of nuclear-power-plant control-room crews: project approach methodology

    International Nuclear Information System (INIS)

    A task analysis of nuclear-power-plant control-room crews was performed by General Physics Corporation and BioTechnology, Inc., for the Office of Nuclear Regulatory Research. The task-analysis methodology used in the project is discussed and compared to traditional task-analysis and job-analysis methods. The objective of the project was to conduct a crew task analysis that would provide data for evaluating six areas: (1) human-engineering design of control rooms and retrofitting of current control rooms; (2) the numbers and types of control-room operators needed with requisite skills and knowledge; (3) operator qualification and training requirements; (4) normal, off-normal, and emergency operating procedures; (5) job-performance aids; and (6) communications. The data-collection approach focused on a generic structural framework for assembling the multitude of task data that were observed. The results of the data-collection effort were compiled in a coputerized task database. Six demonstrations for suitability analysis were subsequently conducted in each of the above areas and are described in this report

  20. Project estimation and selection using the cost: Effectiveness analysis and multi-criteria analysis

    OpenAIRE

    Nikola Č. Petrović; Branko N. Đedović; Dragana N. Petrović

    2012-01-01

    With the desintegration of the former Yugoslavia, the needs for military technique had been significantly reduced. The capacities that exceed the scope and the structure of these needs, for which an export-oriented production would be economically sustainable, should be redirected to the production of regular consumption products. Following the practice of developed countries with multinational character projects and cooperative production of complex military assets would increase the opportu...

  1. A MCDM Analysis of the Roşia Montană Gold Mining Project

    Directory of Open Access Journals (Sweden)

    Adriana Mihai

    2015-06-01

    Full Text Available The need and estimated utility for a structured analysis of the Roşia Montană gold exploitation project have been palpable in the Romanian public sphere during the last 15 years and there is a vast amount of conflicting information and opinions on the benefits and risks involved. This article provides a comprehensive decision analysis of the Roşia Montană project. Over 100 documents from the past years have been gathered regarding the Roşia Montană mining project, which cover the main official, formal and less formal documents covering the case and produced by a wide range of stakeholders. These were then analyzed while designing a multi-criteria tree including the relevant perspectives under which the most commonly discussed four alternatives were analyzed. The result of this can be translated into a valuable recommendation for the mining company and for the political decision-makers. If these stakeholders want the continuation of the project and its acceptance by civil society, the key challenge is to increase the transparency of the process and improve the credibility and legal aspects; if these aspects cannot be met, the decision-makers need to pay attention to the alternatives available for a sustainable development in the area.

  2. New Approaches to Transport Project Assessment: Reference Scenario Forecasting and Quantitative Risk Analysis

    DEFF Research Database (Denmark)

    Salling, Kim Bang

    2010-01-01

    This presentation sets out a new methodology for examining the uncertainties relating to transport decision making based on infrastructure appraisals. Traditional transport infrastructure projects are based upon cost-benefit analyses in order to appraise the projects feasibility. Recent research ....... Additionally, the handling of uncertainties is supplemented by making use of the principle of Optimism Bias, which depicts the historical tendency of overestimating transport related benefits (user demands i.e. travel time savings) and underestimating investment costs.......This presentation sets out a new methodology for examining the uncertainties relating to transport decision making based on infrastructure appraisals. Traditional transport infrastructure projects are based upon cost-benefit analyses in order to appraise the projects feasibility. Recent research...... however has proved that the point estimates derived from such analyses are embedded with a large degree of uncertainty. Thus, a new scheme was proposed in terms of applying quantitative risk analysis (QRA) and Monte Carlo simulation in order to represent the uncertainties within the cost-benefit analysis...

  3. Supplement analysis 2 of environmental impacts resulting from modifications in the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    The West Valley Demonstration Project, located in western New York, has approximately 600,000 gallons of liquid high-level radioactive waste (HLW) in storage in underground tanks. While corrosion analysis has revealed that only limited tank degradation has taken place, the failure of these tanks could release HLW to the environment. Congress requires DOE to demonstrate the technology for removal and solidification of HLW. DOE issued the Final Environmental Impact Statement (FEIS) in 1982. The purpose of this second supplement analysis is to re-assess the 1982 Final Environmental Impact Statement's continued adequacy. This report provides the necessary and appropriate data for DOE to determine whether the environmental impacts presented by the ongoing refinements in the design, process, and operations of the Project are considered sufficiently bounded within the envelope of impacts presented in the FEIS and supporting documentation

  4. Improving student critical thinking skills through a root cause analysis pilot project.

    Science.gov (United States)

    Tschannen, Dana; Aebersold, Michelle

    2010-08-01

    The Essentials of Baccalaureate Education for Professional Nursing Practice provides a framework for building the baccalaureate education for the twenty-first century. One of the exemplars included in the essentials toolkit includes student participation in an actual root cause analysis (RCA) or failure mode effects analysis. To align with this exemplar, faculty at the University of Michigan School of Nursing developed a pilot RCA project for the senior-level Leadership and Management course. While working collaboratively with faculty and unit liaisons at the University Health System, students completed an RCA on a nursing sensitive indicator (pain assessment or plan of care compliance). An overview of the pilot project, including the implementation process, is described. Each team of students identified root causes and recommendations for improvement on clinical and documentation practice within the context of the unit. Feedback from both the unit liaisons and the students confirmed the pilot's success. PMID:20509590

  5. An analysis of the inter-project knowledge transfer in the petrochemical industry

    Directory of Open Access Journals (Sweden)

    Marcelo Müller Beuren

    2015-02-01

    Full Text Available This paper presents a knowledge transfer (KT analysis in an operational project management environment of the petrochemical industry. The main objective of this paper is to identify the major barriers and to suggest improvements activities aiming to foster the KT process. To this end, interviews with members of the project department were conducted by means of a questionnaire. Results were analyzed to identify the most problematic barriers and to propose improvements. The study concluded that the greatest difficulties are related to the transfer of tacit knowledge between different teams. The main contribution of this paper is that it presents an analysis of an unexplored environment and it proposes an improvement of the adapted method for KT study, by using a relationship matrix between the questionnaire and the barriers, so that problems can be identified in an easier manner.

  6. Improving the problem analysis in cost-benefit analysis for transport projects : an explorative study

    NARCIS (Netherlands)

    Annema, J.A.; Mouter, N.

    2013-01-01

    Key actors (consultants, scientists and policy makers) in the Netherlands transport policy cost-benefit analysis (CBA) practice consider ‘problem analysis’ to be one of the important CBA substantive problems. Their idea is that a good-quality problem analysis can help to identify proper solutions, a

  7. An Analysis of Virtual Team Characteristics: A Model for Virtual Project Managers

    OpenAIRE

    Kathryn Cormican; Sandra Morley; Paul Folan

    2015-01-01

    An integrated model, created to guide project managers, is outlined for the implementation and management of virtual teams. This model is developed by means of an exploratory literature review and an empirical investigation of virtual team utilization in a multinational medical device manufacturer, which examines several factors critical to their success. A TOWS matrix is used to structure the results of the analysis and to identify future virtual team strategies for the organization. The stu...

  8. The Use of Personal Projects Analysis to Enhance Occupational Therapy Goal Identification

    OpenAIRE

    Mary Egan; Lori Scott-Lowery; Cynthia De Serres Larose; Liane Gallant; Chantal Jaillet

    2016-01-01

    Background: Client-centered occupational therapy begins with the identification of personally-relevant patient goals. This study aimed to determine whether the elicitation module of Personal Projects Analysis (PPA) could help patients in an acquired brain injury day hospital program identify more meaningful goals than those identified using the Canadian Occupational Performance Measure (COPM) alone. Method: Ten patients completed the COPM. They rated the importance of each goal and their c...

  9. An Elaboration and Analysis of Two Policy Implementation Frameworks to Better Understand Project Exile

    OpenAIRE

    Collins, Matthew Lloyd

    2002-01-01

    An Elaboration and Analysis of Two Policy Implementation Frameworks to Better Understand Project Exile Matthew Lloyd Collins (ABSTRACT) In 1997, on average every 40 to 45 hours criminals either shot or killed a victim in the City of Richmond, Virginia. This resulted in 122 firearm homicides in that year alone. This gun-related violent crime epidemic so terrorized law-abiding citizens that many of them became hostages in their own homes. In response to this horrifi...

  10. Multi-criteria analysis in transport project evaluation: an institutional approach

    OpenAIRE

    De Brucker, Klaas; MACHARIS, Cathy; Verbeke, Alain

    2011-01-01

    We demonstrate that multi-criteria analysis (MCA), though initially developed in the operations research field, can be usefully applied within the context of the stakeholder-driven or institutional approach to transport project evaluation. We first compare the features of the institutional and neoclassical approaches to economic evaluation. We then identify a number of conditions to be fulfilled for the institutional approach to result in a social optimum that is neutral from a distributional...

  11. Summary of the data collection and analysis process used for Temelin NPP PSA project

    International Nuclear Information System (INIS)

    The Temelin NPP is a WWER-1000/320 two unit plant under construction. This paper briefly discusses the characteristics of data sources that were used to estimate the initiating event frequencies, component reliability parameters, unavailabilities due to maintenance, common cause failure probabilities and human error probabilities in the frame of Temelin PSA Project covering Level 1 for both at power and non power modes of operation, external events and the Level 2 analysis. (authors)

  12. Review of research trend in international construction projects: a bibliometric analysis

    OpenAIRE

    Utama, Wahyudi P; Chan, Albert P.C.; Zahoor, Hafiz; Ran GAO

    2016-01-01

    This paper presents the latest research development in international construction project (ICP) domain from 1995 to 2014 as revealed in the construction management related journals. A systematic document retrieval method was employed to collect relevant articles. The identified papers were analyzed by using bibliometric analysis comprising the investigation of the number of publication, the main originators of the research contributions, their affiliations, the most cited papers, and the sour...

  13. An integrated pip stress analysis and pipe support design environment for the CANDU 3 project

    International Nuclear Information System (INIS)

    The promise of significant labour cost savings prompted AECL to automate the CANDU reactor piping systems design. By using a combination of commercial and AECL-developed computer-aided engineering software, the effort required to perform two key tasks, pipe stress analysis and support design, was reduced significantly. This paper describes the integrated piping design environment developed for the CANDU 3 project and benefits derived from its use

  14. REAL OPTIONS ANALYSIS – ASSESSMENT METHOD OF INVESTMENT PROJECTS IN GREEN ENERGY

    Directory of Open Access Journals (Sweden)

    MAFTEI DANIEL

    2014-10-01

    Full Text Available This article highlights the importance of real options as a evaluation method of investment in green energy. Article consider several theoretical and practical approaches, the analysis based on real options by many authors who have theorized and used this method. Each approach provides a operationalisation through a steps series of specific evaluation. This paper highlights the different views: academics, financiers, managers and facilitates the access to an accurate evaluation decisions of projects.

  15. IS ALL SUSTAINABLE DEVELOPMENT SUSTAINABLE? A COST-BENEFIT ANALYSIS OF SOME PROCUREMENT PROJECTS

    OpenAIRE

    Willis, K.G.

    2010-01-01

    This paper outlines sustainable procurement policy, which aims to benefit society and the economy and minimise damage to the environment. It uses cost-benefit analysis to evaluate a variety of sustainable procurement policies (road construction, video conferencing, LED traffic lights, and utilising unemployed people). It shows under what conditions sustainable procurement is likely to benefit the economy and society. The paper also reveals the impact of project life, the discount rate, and th...

  16. Peripheral Blood Lymphocyte Subsets in Adolescents: a Longitudinal Analysis from the REACH Project

    OpenAIRE

    Bret J. Rudy; Wilson, Craig M.; Durako, Stephen; Moscicki, Anna-Barbara; Muenz, Larry; Douglas, Steven D.

    2002-01-01

    Flow cytometry analysis of lymphocyte subset markers was performed for a group of sexually active, human immunodeficiency virus (HIV)-negative adolescents over a 2-year period to establish normative data. Data were collected in the REACH Project (Reaching for Excellence in Adolescent Care and Health), a multicenter, longitudinal study of HIV-positive and high-risk HIV-negative adolescents. Two- and three-color flow cytometry data were collected every 6 months for these subjects. We determined...

  17. The Project "Analysis of Psychological Practice" or: An Attempt at Connecting Psychology Critique and Practice Research

    OpenAIRE

    Renke Fahl; Morus Markard

    1999-01-01

    Using interviews and group discussions, researchers and students from the Free University of Berlin and psychological practitioners work together in a project called 'The Analysis of Psychological Practice', theoretically based on 'Critical Psychology'. The aim is to find out whether and how practitioners deal with the contradictions between experimental-statistical orientation of traditional academic psychology and the single-case-orientation of psychological practice. Can practitioners rela...

  18. SLUDGE TREATMENT PROJECT ENGINEERED CONTAINER RETRIEVAL AND TRANSFER SYSTEM PRELIMINARY DESIGN HAZARD ANALYSIS SUPPLEMENT 1

    Energy Technology Data Exchange (ETDEWEB)

    FRANZ GR; MEICHLE RH

    2011-07-18

    This 'What/If' Hazards Analysis addresses hazards affecting the Sludge Treatment Project Engineered Container Retrieval and Transfer System (ECRTS) NPH and external events at the preliminary design stage. In addition, the hazards of the operation sequence steps for the mechanical handling operations in preparation of Sludge Transport and Storage Container (STSC), disconnect STSC and prepare STSC and Sludge Transport System (STS) for shipping are addressed.

  19. Technology Outlook for STEM+ Education 2013-2018: An NMC Horizon Project Sector Analysis

    Science.gov (United States)

    Johnson, L.; Adams Becker, S.; Estrada, V.; Martín, S.

    2013-01-01

    The "Technology Outlook for STEM+ Education 2013-2018: An NMC Horizon Project Sector Analysis" reflects a collaborative research effort between the New Media Consortium (NMC), the Centro Superior para la Enseñanza Virtual (CSEV), the Departamento de Ingeniería Eléctrica, Electrónica y de Control at the Universidad Nacional de Educación a…

  20. CRITICAL ANALYSIS OF THE EXTREME PROGRAMMING (XP) PROJECT MANAGEMENT METHODOLOGY IN THE INFORMATION TECHNOLOGY FIELD

    OpenAIRE

    Ionel NĂFTĂNĂILĂ; Ivona ORZEA

    2009-01-01

    Extreme Programming represents a modern Project Management methodology, being a part of AGILE methodologies. The present paper has the purpose of making a critical analysis of the Extreme Programming (XP) from the point of view of advantages and disadvantages that it implies, both from a theoretical and practical approach. From the theoretical point of view the paper will present the main contributions in the Extreme Programming literature, analyzing in the same time the main characteristics ...

  1. Explodet Project:. Methods of Automatic Data Processing and Analysis for the Detection of Hidden Explosive

    Science.gov (United States)

    Lecca, Paola

    2003-12-01

    The research of the INFN Gruppo Collegato di Trento in the ambit of EXPLODET project for the humanitarian demining, is devoted to the development of a software procedure for the automatization of data analysis and decision taking about the presence of hidden explosive. Innovative algorithms of likely background calculation, a system based on neural networks for energy calibration and simple statistical methods for the qualitative consistency check of the signals are the main parts of the software performing the automatic data elaboration.

  2. Risk analysis based framework for project planning and maintenance optimization; Riskanalysbaserat ramverk foer projektplanering och underhaallsoptimering

    Energy Technology Data Exchange (ETDEWEB)

    Wallnerstroem, Carl Johan [KTH Royal Institute of Technology, Stockholm (Sweden)

    2012-12-15

    A shorter (equivalent to 4 months full time) postdoctoral project, supported by Elforsk, has been conducted by the research group RCAM, at the Royal Institute of Technology (KTH). The main objective is to develop and benefit from results of a completed doctoral project to provide continuity in the research. This report includes an introduction to the subject, a Swedish translation of a proposed risk analysis based framework for cost-effective resource allocation applied to power distribution systems including an example (also published as two English scientific papers), a brief Swedish summary of some other papers and a closure part which includes proposals for future research. There is an international tendency toward increased demand for both cost efficiency and high reliability of power distribution systems. To meet these demands, asset management methods, including reliability analyses, have been developed. These reliability analyses often utilize only mean values and hence do not take into consideration the consequences of severe events. This report proposes an analysis framework. The aim is to identify more risk categories, to allocate resources more cost-effectively and to be possible to adjust the level of complexity to be suitable to use within the organization of distribution system operators. The suggested framework is exemplified and evaluated by implementing it within the analyses of a real power distribution system. The main concept is to divide comprehensive projects into minor analyses and then, in a final step, compile the results. The proposed analysis framework can be used independently or combined with earlier proposed vulnerability methods. The latter provides a two-dimensional analysis framework. It is shown that totally different investment alternatives could be preferred depending on whether a traditional analysis method using average values is employed compared with the proposed analysis framework, which also considers severe system states

  3. HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT SEISMIC ANALYSIS OF HANFORD DOUBLE SHELL TANKS

    Energy Technology Data Exchange (ETDEWEB)

    MACKEY TC; RINKER MW; CARPENTER BG; HENDRIX C; ABATT FG

    2009-01-15

    M&D Professional Services, Inc. (M&D) is under subcontract to Pacific Northwest National Laboratories (PNNL) to perform seismic analysis of the Hanford Site Double-Shell Tanks (DSTs) in support of a project entitled Double-Shell Tank (DST) Integrity Project - DST Thermal and Seismic Analyses. The original scope of the project was to complete an up-to-date comprehensive analysis of record of the DST System at Hanford in support of Tri-Party Agreement Milestone M-48-14. The work described herein was performed in support of the seismic analysis of the DSTs. The thermal and operating loads analysis of the DSTs is documented in Rinker et al. (2004). Although Milestone M-48-14 has been met, Revision I is being issued to address external review comments with emphasis on changes in the modeling of anchor bolts connecting the concrete dome and the steel primary tank. The work statement provided to M&D (PNNL 2003) required that a nonlinear soil structure interaction (SSI) analysis be performed on the DSTs. The analysis is required to include the effects of sliding interfaces and fluid sloshing (fluid-structure interaction). SSI analysis has traditionally been treated by frequency domain computer codes such as SHAKE (Schnabel, et al. 1972) and SASSI (Lysmer et al. 1999a). Such frequency domain programs are limited to the analysis of linear systems. Because of the contact surfaces, the response of the DSTs to a seismic event is inherently nonlinear and consequently outside the range of applicability of the linear frequency domain programs. That is, the nonlinear response of the DSTs to seismic excitation requires the use of a time domain code. The capabilities and limitations of the commercial time domain codes ANSYS{reg_sign} and MSC Dytran{reg_sign} for performing seismic SSI analysis of the DSTs and the methodology required to perform the detailed seismic analysis of the DSTs has been addressed in Rinker et al (2006a). On the basis of the results reported in Rinker et al

  4. A directory of computer codes suitable for stress analysis of HLW containers - Compas project

    International Nuclear Information System (INIS)

    This document reports the work carried out for the Compas project which looked at the capabilities of various computer codes for the stress analysis of high-level nuclear-waste containers and overpacks. The report concentrates on codes used by the project partners, but also includes a number of the major commercial finite element codes. The report falls into two parts. The first part of the report describes the capabilities of the codes. This includes details of the solution methods used in the codes, the types of analysis which they can carry out and the interfacing with pre - and post - processing packages. This is the more comprehensive section of the report. The second part of the report looks at the performance of a selection of the codes (those used by the project partners). This look at how the codes perform in a number of test problems which require calculations typical of those encountered in the design and analysis of high-level waste containers and overpacks

  5. Object-oriented database design for the contaminant analysis automation project

    International Nuclear Information System (INIS)

    The Contaminant Analysis Automation project's automated soil analysis laboratory uses an Object-Oriented database for storage of runtime and archive information. Data which is generated by the processing of a sample, and is relevant for verification of the specifics of that process, is retained in the database. The database also contains intermediate results which are generated by one step of the process and used for decision making by later steps. The description of this database reveals design considerations of the objects used to model the behavior of the chemical laboratory and its components

  6. Integral Cost-Benefit Analysis of Maglev Rail Projects Under Market Imperfections

    Directory of Open Access Journals (Sweden)

    J. Paul Elhorst

    2008-07-01

    Full Text Available This article evaluates a new mode of high speed ground transportation, the magnetic levitation rail system (Maglev. The outcomes of this evaluation provide policy information on the interregional redistribution of employment and population and the national welfare improvement of two Dutch urban-conglomeration and two Dutch core-periphery projects. This article also compares the results of an integral cost- benefit analysis with those of a conventional cost-benefit analysis and concludes that the additional economic benefits due to market imperfections vary from –1% to +38% of the direct transport benefits, depending on the type of regions connected and the general condition of the economy.

  7. Market analysis - onshore wind energy. Investigation under the project IIe power production from wind energy

    International Nuclear Information System (INIS)

    As basis for the forthcoming discussion on the tender design, the Leipzig Institute for Energy GmbH (IE Leipzig) has worked out a market analysis for the development of onshore wind energy. This analysis with a focus for the years 2012-2014 provides the trends for development of wind energy from the viewing angles of system configuration, the expansion in ''wind farms'' and by location qualities. Moreover characteristics are derived for the development of wind energy projects from an actor survey. This survey collects - in contrast to the studies mentioned above - not claim to provide representative findings.

  8. Application and importance of cost-benefit analysis in energy efficiency projects implemented in public buildings: The case of Serbia

    Directory of Open Access Journals (Sweden)

    Đurovic Dejan M.

    2012-01-01

    Full Text Available The main objective of this paper is to present the advantages of using Cost-Benefit analysis in energy efficiency projects implemented in public buildings, and to prove the hypothesis that Cost-Benefit analysis boosts the effectiveness and efficiency of the said type of projects. The paper offers theoretical and practical explanation of the implementation of Cost-Benefit analysis in the relevant area. Since energy efficiency projects in public buildings usually represent a part of a broader portfolio of similar projects and their implementation demands allocation of substantial financial resources, communities are often be interested in achieving maximal economic and non-economic benefits. This paper aims to demonstrate that Cost-Benefit analysis can represent an excellent contribution when attempting to select the projects for implementation within a broader portfolio of energy efficiency projects in public buildings. This hypothesis was demonstrated by putting a greater emphasis on non-economic benefits and the costs arising from implementation of the aforementioned types of projects. In addition, a practical test of this hypothesis was performed through the implementation of an energy efficiency portfolio in public buildings, worth several tens of millions of dollars - the Serbian Energy Efficiency Project. The paper concludes that the use of Cost-Benefit analysis can help us to effectively evaluate and manage projects of this type aimed at achieving maximum benefits for the community in question.

  9. A COMPARISON OF STEPWISE AND FUZZY MULTIPLE REGRESSION ANALYSIS TECHNIQUES FOR MANAGING SOFTWARE PROJECT RISKS: ANALYSIS PHASE

    Directory of Open Access Journals (Sweden)

    Abdelrafe Elzamly

    2014-01-01

    Full Text Available Risk is not always avoidable, but it is controllable. The aim of this study is to identify whether those techniques are effective in reducing software failure. This motivates the authors to continue the effort to enrich the managing software project risks with consider mining and quantitative approach with large data set. In this study, two new techniques are introduced namely stepwise multiple regression analysis and fuzzy multiple regression to manage the software risks. Two evaluation procedures such as MMRE and Pred (25 is used to compare the accuracy of techniques. The model’s accuracy slightly improves in stepwise multiple regression rather than fuzzy multiple regression. This study will guide software managers to apply software risk management practices with real world software development organizations and verify the effectiveness of the new techniques and approaches on a software project. The study has been conducted on a group of software project using survey questionnaire. It is hope that this will enable software managers improve their decision to increase the probability of software project success.

  10. 网站项目的SWOT系统分析%SWOT Analysis of Website Project

    Institute of Scientific and Technical Information of China (English)

    曹艳琴

    2014-01-01

    This paper is a study of developing a website platform project through the author's study in APTECH for six months. It respectively analyzes the definition of SWOT analysis, simple rules of SWOT analysis and SWOT case analysis, and finally clarifies the limitations of SWOT analysis.%本论文是作者通过在北大青鸟培训学院半年的学习,具体开发一个网站平台项目所撰写的,分别讲述了SWOT分析的定义、SWOT分析法的简单规则、SWOT案例分析,最后阐明SWOT的局限性。

  11. 网站项目的SWOT系统分析%SWOT Analysis of Website Project

    Institute of Scientific and Technical Information of China (English)

    曹艳琴

    2014-01-01

    本论文是作者通过在北大青鸟培训学院半年的学习,具体开发一个网站平台项目所撰写的,分别讲述了SWOT分析的定义、SWOT分析法的简单规则、SWOT案例分析,最后阐明SWOT的局限性。%This paper is a study of developing a website platform project through the author's study in APTECH for six months. It respectively analyzes the definition of SWOT analysis, simple rules of SWOT analysis and SWOT case analysis, and finally clarifies the limitations of SWOT analysis.

  12. Performance analysis for waste repositories in the nordic countries. Report for project AFA-1.2

    International Nuclear Information System (INIS)

    The Nordic Nuclear Safety Research (NKS) project (AFA-1) focused on safety in the final disposal of long-lived low and medium level radioactive waste and its sub project (AFA-1.2), where this report has been produced, is dealing with the performance analysis of the engineered barrier system (near-field) of the repositories for low-and medium level wastes. The topic intentionally excludes the discussion of the characteristics of the geological host medium. Therefore a more generic discussion of the features of performance analysis is possible independent of the fact that different host media are considered in the Nordic countries. The different waste management systems existing and planned in the Nordic countries are shortly described in the report. In the report main emphasis is paid on the general repositories. Some of the phenomena and interactions relevant for a generic type of repository are discussed as well. Among the different approaches for the development of scenarios for safety and performance analyses one particular method - the Rock Engineering System (RES) - was chosen to be demonstratively tested in a brainstorming session, where the possible interactions and their safety significance were discussed employing a simplified and generic Nordic repository system as the reference system. As an overall impression, the AFA-project group concludes that the use of the RES approach is very easy to learn even during a short discussion session. The use of different ways to indicate the safety significance of various interactions in a graphical user interface increases the clarity. Within the project a simple software application was developed employing a generally available spread sheet programme. The developed tool allows an easy opportunity to link the cell specific comments readily available for the 'reader' of the obtained results. A short review of the performance analyses carried out in the Nordic countries for actual projects concerning repositories for

  13. The need for complementary hydraulic analysis in post-restoration monitoring of river restoration projects

    Directory of Open Access Journals (Sweden)

    T. A. Endreny

    2011-03-01

    Full Text Available River restoration design methods are incrementally improved by studying and learning from monitoring data in previous projects. In this paper, we report post-restoration monitoring data for a Natural Channel Design (NCD restoration project along 1600 m (10 channel wavelengths of the Batavia Kill in the Catskill Mountains, NY, implemented in 2001 and 2002. The NCD project used a reference-reach to determine channel form, empirical relations between the project site and reference site bankfull dimensions to size channel geometry, and hydraulic and sediment computations to test channel capacity and sediment stability. In addition 12 cross-vanes and 48 j-hook vanes used in NCD for river training were installed to protect against bank erosion and maintain scour pools for fish habitat. Changes in pool depths were monitored with surveys from 2002–2004, and then after the channel-altering April 2005 flood. Aggradation in pools was attributed to cross-vane arms not concentrating flow in the center of the channel, which subsequently caused flow splitting and 4 partial point bar avulsions during the 2005 flood. Hydrodynamic simulation at the 18 m3s−1 bankfull flow suggested avulsions occurred where vanes allowed erosive bank scour to initiate the avulsion cut, and once the flow was split, the diminished in-channel flow caused more aggradation in the pools. In this project post-restoration monitoring had detected aggradation and considered it a problem. The lesson for the larger river restoration community is monitoring protocol should include complementary hydraulic and sediment analysis to comprehend potential consequences and develop preventative maintenance. River restoration and monitoring teams should be trained in robust hydraulic and sediment analytical methods that help them extend project restoration goals.

  14. 'HESPERIA' HORIZON 2020 project: High Energy Solar Particle Events foRecastIng and Analysis

    Science.gov (United States)

    Malandraki, Olga; Klein, Karl-Ludwig; Vainio, Rami; Agueda, Neus; Nunez, Marlon; Heber, Bernd; Buetikofer, Rolf; Sarlanis, Christos; Crosby, Norma; Bindi, Veronica; Murphy, Ronald; Tyka, Allan J.; Rodriguez, Juan

    2016-04-01

    Solar energetic particles (SEPs) are of prime interest for fundamental astrophysics. However, due to their high energies they are a space weather concern for technology in space as well as human space exploration calling for reliable tools with predictive capabilities. The two-year EU HORIZON 2020 project HESPERIA (High Energy Solar Particle Events foRecastIng and Analysis, http://www.hesperia-space.eu/) will produce two novel operational SEP forecasting tools based upon proven concepts (UMASEP, REleASE). At the same time the project will advance our understanding of the physical mechanisms that result into high-energy SEP events through the systematic exploitation of the high-energy gamma-ray observations of the FERMI mission and other novel published datasets (PAMELA, AMS), together with in situ SEP measurements near 1 AU. By using multi-frequency observations and performing simulations, the project will address the chain of processes from particle acceleration in the corona, particle transport in the magnetically complex corona and interplanetary space to their detection near 1 AU. Furthermore, HESPERIA will explore the possibility of incorporating the derived results into future innovative space weather services. Publicly available software to invert neutron monitor observations of relativistic SEPs to physical parameters, giving information on the high-energy processes occurring at or near the Sun during solar eruptions, will be provided for the first time. The results of this inversion software will complement the space-borne measurements at adjacent higher energies. In order to achieve these goals HESPERIA will exploit already existing large datasets that are stored into databases built under EU FP7 projects NMDB and SEPServer. The structure of the HESPERIA project, its main objectives and forecasting operational tools, as well as the added value to SEP research will be presented and discussed. Acknowledgement: This project has received funding from the

  15. Open Plot Project: an open-source toolkit for 3-D structural data analysis

    Directory of Open Access Journals (Sweden)

    S. Tavani

    2011-05-01

    Full Text Available In this work we present the Open Plot Project, an open-source software for structural data analysis, including a 3-D environment. The software includes many classical functionalities of structural data analysis tools, like stereoplot, contouring, tensorial regression, scatterplots, histograms and transect analysis. In addition, efficient filtering tools are present allowing the selection of data according to their attributes, including spatial distribution and orientation. This first alpha release represents a stand-alone toolkit for structural data analysis.

    The presence of a 3-D environment with digitalising tools allows the integration of structural data with information extracted from georeferenced images to produce structurally validated dip domains. This, coupled with many import/export facilities, allows easy incorporation of structural analyses in workflows for 3-D geological modelling. Accordingly, Open Plot Project also candidates as a structural add-on for 3-D geological modelling software.

    The software (for both Windows and Linux O.S., the User Manual, a set of example movies (complementary to the User Manual, and the source code are provided as Supplement. We intend the publication of the source code to set the foundation for free, public software that, hopefully, the structural geologists' community will use, modify, and implement. The creation of additional public controls/tools is strongly encouraged.

  16. Applying rigorous decision analysis methodology to optimization of a tertiary recovery project

    International Nuclear Information System (INIS)

    This paper reports that the intent of this study was to rigorously look at all of the possible expansion, investment, operational, and CO2 purchase/recompression scenarios (over 2500) to yield a strategy that would maximize net present value of the CO2 project at the Rangely Weber Sand Unit. Traditional methods of project management, which involve analyzing large numbers of single case economic evaluations, was found to be too cumbersome and inaccurate for an analysis of this scope. The decision analysis methodology utilized a statistical approach which resulted in a range of economic outcomes. Advantages of the decision analysis methodology included: a more organized approach to classification of decisions and uncertainties; a clear sensitivity method to identify the key uncertainties; an application of probabilistic analysis through the decision tree; and a comprehensive display of the range of possible outcomes for communication to decision makers. This range made it possible to consider the upside and downside potential of the options and to weight these against the Unit's strategies. Savings in time and manpower required to complete the study were also realized

  17. Analysis of projected water availability with current basin management plan, Pajaro Valley, California

    Science.gov (United States)

    Hanson, Randall T.; Lockwood, Brian; Schmid, Wolfgang

    2014-01-01

    The projection and analysis of the Pajaro Valley Hydrologic Model (PVHM) 34 years into the future using MODFLOW with the Farm Process (MF-FMP) facilitates assessment of potential future water availability. The projection is facilitated by the integrated hydrologic model, MF-FMP that fully couples the simulation of the use and movement of water from precipitation, streamflow, runoff, groundwater flow, and consumption by natural and agricultural vegetation throughout the hydrologic system at all times. MF-FMP allows for more complete analysis of conjunctive-use water-resource systems than previously possible with MODFLOW by combining relevant aspects of the landscape with the groundwater and surface-water components. This analysis is accomplished using distributed cell-by-cell supply-constrained and demand-driven components across the landscape within “water-balance subregions” (WBS) comprised of one or more model cells that can represent a single farm, a group of farms, watersheds, or other hydrologic or geopolitical entities. Analysis of conjunctive use would be difficult without embedding the fully coupled supply-and-demand into a fully coupled simulation, and are difficult to estimate a priori.

  18. Multi-factor Analysis Model for Improving Profit Management Using Excel in Shellfish Farming Projects

    Institute of Scientific and Technical Information of China (English)

    Zhuming; ZHAO; Changlin; LIU; Xiujuan; SHAN; Jin; YU

    2013-01-01

    By using a farm’s data in Yantai City and the theory of Cost-Volume-Profit analysis and the financial management methods,this paper construct a multi-factor analysis model for improving profit management using Excel 2007 in Shellfish farming projects and describes the procedures to construct a multi-factor analysis model.The model can quickly calculate the profit,improve the level of profit management,find out the breakeven point and enhance the decision-making efficiency of businesses etc.It is also a thought of the application to offer suggestions for government decisions and economic decisions for corporations as a simple analysis tool.While effort has been exerted to construct a four-variable model,some equally important variables may not be discussed sufficiently due to limitation of the paper’s space and the authors’knowledge.All variables can be listed in EXCEL 2007 and can be associated in a logical way to manage the profit of shellfish farming projects more efficiently and more practically.

  19. Wind-electric icemaking project: Analysis and dynamometer testing. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Holz, R.; Gervorgian, V.; Drouilhet, S.; Muljadi, E.

    1998-07-01

    The wind/hybrid systems group at the National Renewable Energy Laboratory has been researching the most practical and cost-effective methods for producing ice from off-grid wind-electric power systems. The first phase of the project, conducted in 1993--1994, included full-scale dynamometer and field testing of two different electric ice makers directly connected to a permanent magnet alternator. The results of that phase were encouraging and the second phase of the project was launched in which steady-state and dynamic numerical models of these systems were developed and experimentally validated. The third phase of the project was the dynamometer testing of the North Star ice maker, which is powered by a 12-kilowatt Bergey Windpower Company, Inc., alternator. This report describes both the second and third project phases. Also included are detailed economic analyses and a discussion of the future prospects of wind-electric ice-making systems. The main report is contained in Volume 1. Volume 2 consists of the report appendices, which include the actual computer programs used in the analysis and the detailed test results.

  20. The Use of Personal Projects Analysis to Enhance Occupational Therapy Goal Identification

    Directory of Open Access Journals (Sweden)

    Mary Egan

    2016-01-01

    Full Text Available Background: Client-centered occupational therapy begins with the identification of personally-relevant patient goals. This study aimed to determine whether the elicitation module of Personal Projects Analysis (PPA could help patients in an acquired brain injury day hospital program identify more meaningful goals than those identified using the Canadian Occupational Performance Measure (COPM alone. Method: Ten patients completed the COPM. They rated the importance of each goal and their confidence that they could attain each goal. During the next session, using the elicitation module of PPA, they identified personal projects just prior to their brain injuries, current personal projects, and future desired personal projects. They were then invited to revise their COPM goals and re-rate them for importance and confidence. Results: Following completion of the elicitation module of PPA, seven participants changed at least one goal. Of the goals that were changed, half were revised to include the mention of another person. There were no significant changes in average goal importance or perceived attainability. Occupational therapists reported that the elicitation module of PPA helped them get to know their patients better and identify potential therapeutic occupations. Discussion: The elicitation module of PPA may help people develop goals that are more embedded in their social contexts.

  1. Review of U.S. ESCO industry market trends: An empirical analysis of project data

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, Charles A.; Hopper, Nicole C.; Osborn, Julie G.; Singer, Terry E.

    2003-03-01

    This article summarizes a comprehensive empirical analysis of U.S. Energy Service Company (ESCO) industry trends and performance. We employ two parallel analytical approaches: a comprehensive survey of firms to estimate total industry size and a database of {approx}1500 ESCO projects, from which we report target markets and typical project characteristics, energy savings and customer economics. We estimate that industry investment for energy-efficiency related services reached US $2 billion in 2000 following a decade of strong growth. ESCO activity is concentrated in states with high economic activity and strong policy support. Typical projects save 150-200 MJ/m2/year and are cost-effective with median benefit/cost ratios of 1.6 and 2.1 for institutional and private sector projects. The median simple payback time is 7 years among institutional customers; 3 years is typical in the private sector. Reliance on DSM incentives has decreased since 1995. Preliminary evidence suggests that state enabling policies have boosted the industry in medium-sized states. ESCOs have proven resilient in the face of restructuring and will probably shift toward selling ''energy solutions,'' with energy efficiency part of a package. We conclude that a private sector energy-efficiency services industry that targets large commercial and industrial customers is viable and self-sustaining with appropriate policy support both financial and non-financial.

  2. Review of US ESCO industry market trends: an empirical analysis of project data

    International Nuclear Information System (INIS)

    This comprehensive empirical analysis of US energy service company (ESCO) industry trends and performance employs two parallel analytical approaches: a survey of firms to estimate total industry size, and a database of ∼1500 ESCO projects, from which we report target markets and typical project characteristics, energy savings and customer economics. We estimate that industry investment for energy-efficiency related services reached US$2 billion in 2000 following a decade of strong growth. ESCO activity is concentrated in states with high economic activity and strong policy support. Typical projects save 150-200 MJ/m2/year and are cost-effective with median benefit/cost ratios of 1.6 and 2.1 for institutional and private sector projects. The median simple payback time (SPT) is 7 years among institutional customers; 3 years is typical in the private sector. Reliance on DSM incentives has decreased since 1995. Preliminary evidence suggests that state enabling policies have boosted the industry in medium-sized states. ESCOs have proven resilient in the face of restructuring and will probably shift toward selling 'energy solutions', with energy efficiency part of a package. We conclude that appropriate policy support - both financial and non-financial - can 'jump-start' a viable private-sector energy-efficiency services industry that targets large institutional and commercial/industrial customers

  3. Hybrid approach in statistical bias correction of projected precipitation for the frequency analysis of extreme events

    Science.gov (United States)

    Um, Myoung-Jin; Kim, Hanbeen; Heo, Jun-Haeng

    2016-08-01

    A general circulation model (GCM) can be applied to project future climate factors, such as precipitation and atmospheric temperature, to study hydrological and environmental climate change. Although many improvements in GCMs have been proposed recently, projected climate data are still required to be corrected for the biases in generating data before applying the model to practical applications. In this study, a new hybrid process was proposed, and its ability to perform bias correction for the prediction of annual precipitation and annual daily maxima, was tested. The hybrid process in this study was based on quantile mapping with the gamma and generalized extreme value (GEV) distributions and a spline technique to correct the bias of projected daily precipitation. The observed and projected daily precipitation values from the selected stations were analyzed using three bias correction methods, namely, linear scaling, quantile mapping, and hybrid methods. The performances of these methods were analyzed to find the optimal method for prediction of annual precipitation and annual daily maxima. The linear scaling method yielded the best results for estimating the annual average precipitation, while the hybrid method was optimal for predicting the variation in annual precipitation. The hybrid method described the statistical characteristics of the annual maximum series (AMS) similarly to the observed data. In addition, this method demonstrated the lowest root mean squared error (RMSE) and the highest coefficient of determination (R2) for predicting the quantiles of the AMS for the extreme value analysis of precipitation.

  4. UMTRA Project water sampling and analysis plan, Canonsburg, Pennsylvania. Revision 1

    International Nuclear Information System (INIS)

    Surface remedial action was completed at the US Department of Energy (DOE) Canonsburg and Burrell Uranium Mill Tailings Remedial Action (UMTRA) Project sites in southwestern Pennsylvania in 1985 and 1987, respectively. The Burrell disposal site, included in the UMTRA Project as a vicinity property, was remediated in conjunction with the remedial action at Canonsburg. On 27 May 1994, the Nuclear Regulatory Commission (NRC) accepted the DOE final Long-Term Surveillance Plan (LTSP) (DOE, 1993) for Burrell thus establishing the site under the general license in 10 CFR section 40.27 (1994). In accordance with the DOE guidance document for long-term surveillance (DOE, 1995), all NRC/DOE interaction on the Burrell site's long-term care now is conducted with the DOE Grand Junction Projects Office in Grand Junction, Colorado, and is no longer the responsibility of the DOE UMTRA Project Team in Albuquerque, New Mexico. Therefore, the planned sampling activities described in this water sampling and analysis plan (WSAP) are limited to the Canonsburg site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring at the Canonsburg site for calendar years 1995 and 1996. Currently, the analytical data further the site characterization and demonstrate that the disposal cell's initial performance is in accordance with design requirements

  5. Wind-electric icemaking project: Analysis and dynamometer testing. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Holz, R; Gervorgian, V; Drouilhet, S; Muljadi, E

    1998-07-01

    The wind/hybrid systems group at the National Renewable Energy Laboratory has been researching the most practical and cost-effective methods for producing ice from off-grid wind-electric power systems. The first phase of the project, conducted in 1993--1994, included full-scale dynamometer and field testing of two different electric ice makers directly connected to a permanent magnet alternator. The results of that phase were encouraging and the second phase of the project was launched in which steady-state and dynamic numerical models of these systems were developed and experimentally validated. The third phase of the project was the dynamometer testing of the North Star ice maker, which is powered by a 12-kilowatt Bergey Windpower Company, Inc., alternator. This report describes both the second and third project phases. Also included are detailed economic analyses and a discussion of the future prospects of wind-electric ice-making systems. The main report is contained in Volume 1. Volume 2 consists of the report appendices, which include the actual computer programs used in the analysis and the detailed test results.

  6. Stakeholders of Voluntary Forest Carbon Offset Projects in China: An Empirical Analysis

    Directory of Open Access Journals (Sweden)

    Derong Lin

    2015-01-01

    Full Text Available Climate change is one of the defining challenges facing the planet. Voluntary forest carbon offset project which has the potential to boost forest carbon storage and mitigate global warming has aroused the global concern. The objective of this paper is to model the game situation and analyze the game behaviors of stakeholders of voluntary forest carbon offset projects in China. A stakeholder model and a Power-Benefit Matrix are constructed to analyze the roles, behaviors, and conflicts of stakeholders including farmers, planting entities, communities, government, and China Green Carbon Foundation. The empirical analysis results show that although the stakeholders have diverse interests and different goals, a win-win solution is still possible through their joint participation and compromise in the voluntary forest carbon offset project. A wide governance structure laying emphasis on benefit balance, equality, and information exchanges and being regulated by all stakeholders has been constructed. It facilitates the agreement among the stakeholders with conflicting or different interests. The joint participation of stakeholders in voluntary forest carbon offset projects might change the government-dominated afforestation/reforestation into a market, where all participators including government are encouraged to cooperate with each other to improve the condition of fund shortage and low efficiency.

  7. Review of US ESCO industry market trends: an empirical analysis of project data

    International Nuclear Information System (INIS)

    This comprehensive empirical analysis of US energy service company (ESCO) industry trends and performance employs two parallel analytical approaches: a survey of firms to estimate total industry size, and a database of ∼1500 ESCO projects, from which we report target markets and typical project characteristics, energy savings and customer economics. We estimate that industry investment for energy-efficiency related services reached US$2 billion in 2000 following a decade of strong growth. ESCO activity is concentrated in states with high economic activity and strong policy support. Typical projects save 150-200 MJ/m2/year and are cost-effective with median benefit/cost ratios of 1.6 and 2.1 for institutional and private sector projects. The median simple payback time (SPT) is 7 years among institutional customers; 3 years is typical in the private sector. Reliance on DSM incentives has decreased since 1995. Preliminary evidence suggests that state enabling policies have boosted the industry in medium-sized states. ECSOs have proven resilient in the face of restructuring and will probably shift toward selling 'energy solutions', with energy efficiency part of a package. We conclude that appropriate policy support - both financial and non-financial - can 'jump-start' a viable private-sector energy-efficiency services industry that targets large institutional and commercial/industrial customers. (author)

  8. Analysis model for the physical dimension in the environmental studies of electric transmission projects

    International Nuclear Information System (INIS)

    This study makes a description and analysis of the physical aspects of the environment, which are contemplated, in the environmental studies of the projects of high voltage for electric transmission lines. Its meaning and out reach are defined in this projects, in its different phases of implementation; that is in the stages of design, construction and operation, making proposals to improve the adequate incorporation of physical dimension in the environmental activities. A very important aspect, worked out in the investigation, has to do with the way as this dimension is described in the real terms of reference for EIA of the Ministry of Environment; that is why it is analysed and some elements are proposed which are to correct and to articulate properly the information in these studies, because some problems were found in the articulation and contents of the physical aspects in the studies of environmental impact (EIA). Another very important aspect, which was obtained with this research, is the methodological proposal for the integration of the components of the physical dimension in which synthesis units are defined in different scales for the integration of those components. These facts will facilitate a better understanding of the natural processes in the areas of influence of the projects and a better understanding of the reciprocal relations between the project and the physical surroundings. In the process of searching a methodology for integration of the components of the physical dimension it is hoped that the studies be more congruent from the environmental point of view

  9. The Fog Remote Sensing and Modeling (FRAM) field project: visibility analysis and remote sensing of fog

    Science.gov (United States)

    Gultepe, I.; Minnis, P.; Milbrandt, J.; Cober, S. G.; Nguyen, L.; Flynn, C.; Hansen, B.

    2008-08-01

    The main objective of this work is to describe a research project on fog and visibility, and to summarize the results. The Fog Remote Sensing and Modeling (FRAM) project was designed to focus on 1) development of microphysical parameterizations for model applications, 2) development of remote sensing methods for fog nowcasting/forecasting, 3) understanding of issues related to instrument capabilities and improvement of the analysis, and 4) integration of model data with observations. The FRAM was conducted over three regions of Canada and US. These locations were: 1) Center for Atmospheric Research Experiments (CARE), Egbert, Ontario 2005-2006, 2) Lunenburg, Nova Scotia June of 2006 and 2007, and 3) U.S. Department Of Energy (DOE) ARM Climate Research Facility at Barrow, Alaska, US during the Indirect and Semi-Direct Aerosol Campaign (ISDAC) field program April of 2008; FRAM C, FRAM-L, and ISDAC-FRAM-B, respectively. FRAM-C was undertaken in a continental fog environment while FRAM-L was in a marine environment. The FRAM-B was undertaken to study ice fog conditions. During the project, numerous in-situ measurements were obtained, including droplet and aerosol spectra, precipitation, and visibility. Analysis of satellite microphysical retrievals and visibility parameterizations suggested that improved scientific understanding of fog formation can lead to better forecasting/nowcasting skills benefiting both aviation and public forecasting applications.

  10. Final Hazard Classification and Auditable Safety Analysis for the 105-F Building Interim Safe Storage Project

    International Nuclear Information System (INIS)

    The auditable safety analysis (ASA) documents the authorization basis for the partial decommissioning and facility modifications to place the 105-F Building into interim safe storage (ISS). Placement into the ISS is consistent with the preferred alternative identified in the Record of Decision (58 FR). Modifications will reduce the potential for release and worker exposure to hazardous and radioactive materials, as well as lower surveillance and maintenance (S ampersand M) costs. This analysis includes the following: A description of the activities to be performed in the course of the 105-F Building ISS Project. An assessment of the inventory of radioactive and other hazardous materials within the 105-F Building. Identification of the hazards associated with the activities of the 105-F Building ISS Project. Identification of internally and externally initiated accident scenarios with the potential to produce significant local or offsite consequences during the 105-F Building ISS Project. Bounding evaluation of the consequences of the potentially significant accident scenarios. Hazard classification based on the bounding consequence evaluation. Associated safety function and controls, including commitments. Radiological and other employee safety and health considerations

  11. Hydrodynamic Modeling Analysis to Support Nearshore Restoration Projects in a Changing Climate

    Directory of Open Access Journals (Sweden)

    Zhaoqing Yang

    2014-01-01

    Full Text Available To re-establish the intertidal wetlands with full tidal exchange and improve salmonid rearing habitat in the Skagit River estuary, State of Washington, USA, a diked agriculture farm land along the Skagit Bay front is proposed to be restored to a fully functional tidal wetland. The complex and dynamic Skagit River estuarine system calls for the need of a multi-facet and multi-dimensional analysis using observed data, numerical and analytical methods. To assist the feasibility study of the restoration project, a hydrodynamic modeling analysis was conducted using a high-resolution unstructured-grid coastal ocean model to evaluate the hydrodynamic response to restoration alternatives and to provide guidance to the engineering design of a new levee in the restoration site. A set of parameters were defined to quantify the hydrodynamic response of the nearshore restoration project, such as inundation area, duration of inundation, water depth and salinity of the inundated area. To assist the design of the new levee in the restoration site, the maximum water level near the project site was estimated with consideration of extreme high tide, wind-induced storm surge, significant wave height and future sea-level rise based on numerical model results and coastal engineering calculation.

  12. Managing Large Scale Project Analysis Teams through a Web Accessible Database

    Science.gov (United States)

    O'Neil, Daniel A.

    2008-01-01

    Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.

  13. A Critical Analysis of Climate Change Factors and its Projected Future Values in Delta State, Nigeria

    Directory of Open Access Journals (Sweden)

    Emaziye, P. O., R. N. Okoh

    2012-06-01

    Full Text Available The study focused on the critical analysis of climate change factors (temperature and rainfall and its projected future values in the state. The main objective was to determine the trends of climate change factors (temperature and rainfall. And the specific objective was to determine the projected future trends of climate change factors in the state. Multistage sampling procedure was used in the random selection of states, local government, communities and rural households for the research study. Annual mean time series data of temperature and rainfall were collected from Nigerian Meteorological Agency (NIMET. Data were also obtained from structure questionnaire survey. The collected data were analyzed using descriptive statistics, trend analysis and growth model. The study reveals that there were increasing trends of temperature values and decreasing rainfall values in the state. But their projected future values witnessed an increasing trend. The increasing trends in temperature values may lead to a situation were crops will be smothered by excessive heat thereby reducing food production in the state. The study therefore recommends that meteorological station units should be established in the rural farming households in the state where accessibility is extremely difficult. This will make available meteorological data (information to the reach of the poor rural farming household for the attainment of food production.

  14. Human Reliability Analysis in Frame of Probabilistic Safety Assessment Projects in Czech Republic

    International Nuclear Information System (INIS)

    Human reliability analysis has proved to be a very important part of probabilistic safety analysis all over the world. It has been also an integral part of both Probabilistic Safety Level-1 studies developed in Czech Republic - Nuclear Power Plant Dukovany Probabilistic Safety Assessment and Nuclear Power Plant Temelin Probabilistic Safety Assessment and most of their consequent applications. The methodology used in human reliability analysis in frame of these studies is described in the first part of the paper. In general, the methodology is based on the well-known and most frequently used methods Technique for Human Error Rate Prediction and ASEP. The up-to-date decision tree method is used to address procedure-driven operator's interventions during plant response to initiating event. Some interesting results of human reliability analysis performed for Nuclear Power Plant Dukovany are described in the second part of the paper. The recommendations resulting from the analysis led to the standardization of some, up to that time, non-standard operator's actions and to the development of procedures for them. Generally, the procedures were found to be deficient from several points of view, what contributed to the decision to develop quite new emergency procedures for Nuclear Power Plant Dukovany. The human reliability analysis projects going on or planned for the very next future are described in the final part of the paper. safety analysis; risk assessment; reliability; nuclear power plants; human factors; errors; Czech Republic; operators; emergencies;

  15. Development of severe accident Analysis Code SAMPSON in super simulator IMPACT' project

    Energy Technology Data Exchange (ETDEWEB)

    Morii, Tadashi; Ujita, Hiroshi; Vierow, Karen; Naitoh, Masanori [Advanced Simulation Systems Department, Nuclear Power Engineering Corporation, Tokyo (Japan); Yamagishi, Makoto

    1999-07-01

    The Four years of the IMPACT, 'Integrated Modular Plant Analysis and Computing Technology', project Phase 1 have been completed. At the end of Phase 1, the Basic Single-, Two-, Multi-Phase Flow Analysis Modules of Various Coordinates have been parallelized. The physical models in the Boiling Transition Analysis Code and the Fluid-Structure Interaction Analysis Code have been completed and verified by comparison with basic experimental results. The verification study of the code was conducted in two steps. First, each analysis module was run independently and analysis results were compared against separate-effect experiment data. Verification analyses included: CORA-13 (FZK) for the Core Heat-up Module; VI-3 of HI/VI Test (ORNL) for the FP Release from Fuel Module; KROTOS-37 (JRC-ISPRA) for the Molten Core Relocation Module; Water Spread Test (UCSB) for the Debris Spreading Model and Benard's Melting Test for Natural Convection Model in the Debris Cooling Module; Hydrogen Burning Test (NUPEC) for the Ex- Vessel Thermal Hydraulics Module; PREMIX, PM10 (FZK) for the Steam Explosion Module; and SWISS-2 (SNL) for the Debris-Concrete Interaction Module. All comparison showed good agreement. Second, with the Simulation Supervisory Module, these analysis modules were executed concurrently in the parallel environment to demonstrate the code capability and integrity. (J.P.N.)

  16. HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT SEISMIC ANALYSIS OF HANFORD DOUBLE SHELL TANKS

    Energy Technology Data Exchange (ETDEWEB)

    MACKEY, T.C.

    2006-03-17

    M&D Professional Services, Inc. (M&D) is under subcontract to Pacific Northwest National Laboratory (PNNL) to perform seismic analysis of the Hanford Site double-shell tanks (DSTs) in support of a project entitled ''Double-Shell Tank (DSV Integrity Project--DST Thermal and Seismic Analyses)''. The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the DST system at Hanford in support of Tri-Party Agreement Milestone M-48-14, The work described herein was performed in support of the seismic analysis of the DSTs. The thermal and operating loads analysis of the DSTs is documented in Rinker et al. (2004). The work statement provided to M&D (PNNL 2003) required that the seismic analysis of the DSTs assess the impacts of potentially non-conservative assumptions in previous analyses and account for the additional soil mass due to the as-found soil density increase, the effects of material degradation, additional thermal profiles applied to the full structure including the soil-structure response with the footings, the non-rigid (low frequency) response of the tank roof, the asymmetric seismic-induced soil loading, the structural discontinuity between the concrete tank wall and the support footing and the sloshing of the tank waste. The seismic analysis considers the interaction of the tank with the surrounding soil and the effects of the primary tank contents. The DSTs and the surrounding soil are modeled as a system of finite elements. The depth and width of the soil incorporated into the analysis model are sufficient to obtain appropriately accurate analytical results. The analyses required to support the work statement differ from previous analysis of the DSTs in that the soil-structure interaction (SSI) model includes several (nonlinear) contact surfaces in the tank structure, and the contained waste must be modeled explicitly in order to capture the fluid-structure interaction behavior between the primary

  17. Superdeformed band in the $N = Z+4$ nucleus $^{40}$Ar: A projected shell model analysis

    CERN Document Server

    Yang, Ying-Chun; Sun, Yang; Guidry, Mike

    2015-01-01

    It has been debated whether the experimentally-identified superdeformed rotational band in $^{40}$Ar [E. Ideguchi, et al., Phys. Lett. B 686 (2010) 18] has an axially or triaxially deformed shape. Projected shell model calculations with angular-momentum-projection using an axially-deformed basis are performed up to high spins. Our calculated energy levels indicate a perfect collective-rotor behavior for the superdeformed yrast band. However, detailed analysis of the wave functions reveals that the high-spin structure is dominated by mixed 0-, 2-, and 4-quasiparticle configurations. The calculated electric quadrupole transition probabilities reproduce well the known experimental data and suggest a reduced, but still significant, collectivity in the high spin region. The deduced triaxial deformation parameters are small throughout the entire band, suggesting that triaxiality is not very important for this superdeformed band.

  18. Social network analysis of a project-based introductory physics course

    Science.gov (United States)

    Oakley, Christopher

    2016-03-01

    Research suggests that students benefit from peer interaction and active engagement in the classroom. The quality, nature, effect of these interactions is currently being explored by Physics Education Researchers. Spelman College offers an introductory physics sequence that addresses content and research skills by engaging students in open-ended research projects, a form of Project-Based Learning. Students have been surveyed at regular intervals during the second semester of trigonometry-based course to determine the frequency of interactions in and out of class. These interactions can be with current or past students, tutors, and instructors. This line of inquiry focuses on metrics of Social Network analysis, such as centrality of participants as well as segmentation of groups. Further research will refine and highlight deeper questions regarding student performance in this pedagogy and course sequence.

  19. Incremental dynamical downscaling for probabilistic analysis based on multiple GCM projections

    Science.gov (United States)

    Wakazuki, Y.; Rasmussen, R.

    2015-12-01

    A dynamical downscaling method for probabilistic regional-scale climate change projections was developed to cover the inherent uncertainty associated with multiple general circulation model (GCM) climate simulations. The climatological increments estimated by GCM results were statistically analyzed using the singular vector decomposition. Both positive and negative perturbations from the ensemble mean with the magnitudes of their standard deviations were extracted and added to the ensemble mean of the climatological increments. The analyzed multiple modal increments were utilized to create multiple modal lateral boundary conditions for the future climate regional climate model (RCM) simulations by adding them to reanalysis data. The incremental handling of GCM simulations realized approximated probabilistic climate change projections with the smaller number of RCM simulations. For the probabilistic analysis, three values of a climatological variable simulated by RCMs for a mode were analyzed under an assumption of linear response to the multiple modal perturbations.

  20. Grid Databases for Shared Image Analysis in the MammoGrid Project

    CERN Document Server

    Amendolia, S R; Hauer, T; Manset, D; McClatchey, R; Odeh, M; Reading, T; Rogulin, D; Schottlander, D; Solomonides, T

    2004-01-01

    The MammoGrid project aims to prove that Grid infrastructures can be used for collaborative clinical analysis of database-resident but geographically distributed medical images. This requires: a) the provision of a clinician-facing front-end workstation and b) the ability to service real-world clinician queries across a distributed and federated database. The MammoGrid project will prove the viability of the Grid by harnessing its power to enable radiologists from geographically dispersed hospitals to share standardized mammograms, to compare diagnoses (with and without computer aided detection of tumours) and to perform sophisticated epidemiological studies across national boundaries. This paper outlines the approach taken in MammoGrid to seamlessly connect radiologist workstations across a Grid using an "information infrastructure" and a DICOM-compliant object model residing in multiple distributed data stores in Italy and the UK

  1. Madagascar: open-source software project for multidimensional data analysis and reproducible computational experiments

    Directory of Open Access Journals (Sweden)

    Sergey Fomel

    2013-11-01

    Full Text Available The Madagascar software package is designed for analysis of large-scale multidimensional data, such as those occurring in exploration geophysics. Madagascar provides a framework for reproducible research. By “reproducible research” we refer to the discipline of attaching software codes and data to computational results reported in publications. The package contains a collection of (a computational modules, (b data-processing scripts, and (c research papers. Madagascar is distributed on SourceForge under a GPL v2 license https://sourceforge.net/projects/rsf/. By October 2013, more than 70 people from different organizations around the world have contributed to the project, with increasing year-to-year activity. The Madagascar website is http://www.ahay.org/.

  2. Projected photovoltaic energy impacts on US CO2 emissions: an integrated energy environmental-economic analysis

    International Nuclear Information System (INIS)

    The potential role of photovoltaic technologies in reducing carbon dioxide (CO2) emissions in the USA was evaluated using an energy-environment-economic systems model. With a range of assumptions about future scenarios up to 2030, the model results provide an objective quantitative assessment of the prospects for photovoltaics in a competitive market. With the projected improvements in cost and efficiency, photovoltaics will compete favourably as a general source of electricity supply to the grid by about 2010 in southwestern USA. This analysis indicates that photovoltaics has the potential to reach a total installed capacity of 140 GW by the year 2030, and to displace a cumulative 450 million metric tons of carbon emissions from 1995 to 2030. At the projected 2030 capacity, photovoltaics could displace over 64 million metric tons of carbon emissions a year. Under constraints on carbon emissions, photovoltaics becomes more cost effective and would further reduce carbon emissions from the US energy system. (author)

  3. Partial signal space projection for artefact removal in MEG measurements: a theoretical analysis

    International Nuclear Information System (INIS)

    Standard methods for artefact removal in MEG or EEG measurements consist of rejection of either corrupted epochs or signal space projection (SSP). We propose to combine the two methods by applying SSP only in corrupted epochs and thus using both temporal and spatial information. This partial signal space projection necessarily results in smaller variances for the source localization. Formulae for dipole localization errors as a function of fraction of corrupted epochs are derived and verified in Monte Carlo simulations of MEG measurements corrupted with eye artefacts. A theoretical analysis of various measuring devices, classes of artefact and locations of dipole of interest shows that the proposed method leads to significant improvement for frontal signal dipoles and for 30-80% corrupted epochs. (author)

  4. UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6

    International Nuclear Information System (INIS)

    This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years

  5. Using offsets to mitigate environmental impacts of major projects: A stakeholder analysis.

    Science.gov (United States)

    Martin, Nigel; Evans, Megan; Rice, John; Lodhia, Sumit; Gibbons, Philip

    2016-09-01

    Global patterns of development suggest that as more projects are initiated, business will need to find acceptable measures to conserve biodiversity. The application of environmental offsets allows firms to combine their economic interests with the environment and society. This article presents the results of a multi-stakeholder analysis related to the design of offsets principles, policies, and regulatory processes, using a large infrastructure projects context. The results indicate that business was primarily interested in using direct offsets and other compensatory measures, known internationally as indirect offsets, to acquit their environmental management obligations. In contrast, the environmental sector argued that highly principled and scientifically robust offsets programs should be implemented and maintained for enduring environmental protection. Stakeholder consensus stressed the importance of offsets registers with commensurate monitoring and enforcement. Our findings provide instructive insights into the countervailing views of offsets policy stakeholders. PMID:27173891

  6. Methods, apparatuses, and computer-readable media for projectional morphological analysis of N-dimensional signals

    Science.gov (United States)

    Glazoff, Michael V.; Gering, Kevin L.; Garnier, John E.; Rashkeev, Sergey N.; Pyt'ev, Yuri Petrovich

    2016-05-17

    Embodiments discussed herein in the form of methods, systems, and computer-readable media deal with the application of advanced "projectional" morphological algorithms for solving a broad range of problems. In a method of performing projectional morphological analysis, an N-dimensional input signal is supplied. At least one N-dimensional form indicative of at least one feature in the N-dimensional input signal is identified. The N-dimensional input signal is filtered relative to the at least one N-dimensional form and an N-dimensional output signal is generated indicating results of the filtering at least as differences in the N-dimensional input signal relative to the at least one N-dimensional form.

  7. QR Codes in the Library: Are They Worth the Effort? Analysis of a QR Code Pilot Project

    OpenAIRE

    Andrew M. Wilson

    2012-01-01

    The literature is filled with potential uses for Quick Response (QR) codes in the library. Setting, but few library QR code projects have publicized usage statistics. A pilot project carried out in the Eda Kuhn Loeb Music Library of the Harvard College Library sought to determine whether library patrons actually understand and use QR codes. Results and analysis of the pilot project are provided, attempting to answer the question as to whether QR codes are worth the effort for libraries.

  8. Development of debris coolability analysis module in severe accident analysis code SAMPSON for IMPACT project

    International Nuclear Information System (INIS)

    Debris coolability in the lower plenum of the reactor pressure vessel is an important factor for the evaluation of in-vessel debris retention. The debris coolability analysis module has been developed to predict more mechanistically the safety margin of the present reactor vessels in a severe accident. The module calculates debris spreading and cooling through melting and solidification in combination with the temperature distribution of the vessel wall and it evaluates the wall failure. Debris spreading is solved by the explicit method on a quasi-three-dimensional scheme and debris coolability is solved on the basis of natural convection analysis with melting and solidification. The calculated results for spreading were compared with the results from a water spreading experiment on the floor and the results for coolability were compared with those from an n-octadecane melting experiment in the rectangular vessel. The comparisons showed the capability for predictions of the spearhead transportation in the debris spreading process and of the melting front transportation and time evolution of the fluid temperature in the melting process. The module provides a good tool for the prediction of the reactor pressure vessel safety margin in a severe accident through the analysis of debris spreading and coolability. (author)

  9. Development of debris coolability analysis module in severe accident analysis code SAMPSON for IMPACT project

    Energy Technology Data Exchange (ETDEWEB)

    Ujita, Hiroshi [Advanced Simulation Systems Department, Nuclear Power Engineering Cooperation, Tokyo (Japan); Hidaka, Masataka; Susuki, Akira; Ishida, Naoyuki

    1999-10-01

    Debris coolability in the lower plenum of the reactor pressure vessel is an important factor for the evaluation of in-vessel debris retention. The debris coolability analysis module has been developed to predict more mechanistically the safety margin of the present reactor vessels in a severe accident. The module calculates debris spreading and cooling through melting and solidification in combination with the temperature distribution of the vessel wall and it evaluates the wall failure. Debris spreading is solved by the explicit method on a quasi-three-dimensional scheme and debris coolability is solved on the basis of natural convection analysis with melting and solidification. The calculated results for spreading were compared with the results from a water spreading experiment on the floor and the results for coolability were compared with those from an n-octadecane melting experiment in the rectangular vessel. The comparisons showed the capability for predictions of the spearhead transportation in the debris spreading process and of the melting front transportation and time evolution of the fluid temperature in the melting process. The module provides a good tool for the prediction of the reactor pressure vessel safety margin in a severe accident through the analysis of debris spreading and coolability. (author)

  10. Analysis of projected water availability with current basin management plan, Pajaro Valley, California

    Science.gov (United States)

    Hanson, R. T.; Lockwood, B.; Schmid, Wolfgang

    2014-11-01

    The projection and analysis of the Pajaro Valley Hydrologic Model (PVHM) 34 years into the future using MODFLOW with the Farm Process (MF-FMP) facilitates assessment of potential future water availability. The projection is facilitated by the integrated hydrologic model, MF-FMP that fully couples the simulation of the use and movement of water from precipitation, streamflow, runoff, groundwater flow, and consumption by natural and agricultural vegetation throughout the hydrologic system at all times. MF-FMP allows for more complete analysis of conjunctive-use water-resource systems than previously possible with MODFLOW by combining relevant aspects of the landscape with the groundwater and surface-water components. This analysis is accomplished using distributed cell-by-cell supply-constrained and demand-driven components across the landscape within “water-balance subregions” (WBS) comprised of one or more model cells that can represent a single farm, a group of farms, watersheds, or other hydrologic or geopolitical entities. Analysis of conjunctive use would be difficult without embedding the fully coupled supply-and-demand into a fully coupled simulation, and are difficult to estimate a priori. The analysis of projected supply and demand for the Pajaro Valley indicate that the current water supply facilities constructed to provide alternative local sources of supplemental water to replace coastal groundwater pumpage, but may not completely eliminate additional overdraft. The simulation of the coastal distribution system (CDS) replicates: 20 miles of conveyance pipeline, managed aquifer recharge and recovery (MARR) system that captures local runoff, and recycled-water treatment facility (RWF) from urban wastewater, along with the use of other blend water supplies, provide partial relief and substitution for coastal pumpage (aka in-lieu recharge). The effects of these Basin Management Plan (BMP) projects were analyzed subject to historical climate variations

  11. Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Evan; Mathew, Paul

    2009-04-01

    Buildings rarely perform as intended, resulting in energy use that is higher than anticipated. Building commissioning has emerged as a strategy for remedying this problem in non-residential buildings. Complementing traditional hardware-based energy savings strategies, commissioning is a 'soft' process of verifying performance and design intent and correcting deficiencies. Through an evaluation of a series of field projects, this report explores the efficacy of an emerging refinement of this practice, known as monitoring-based commissioning (MBCx). MBCx can also be thought of as monitoring-enhanced building operation that incorporates three components: (1) Permanent energy information systems (EIS) and diagnostic tools at the whole-building and sub-system level; (2) Retro-commissioning based on the information from these tools and savings accounting emphasizing measurement as opposed to estimation or assumptions; and (3) On-going commissioning to ensure efficient building operations and measurement-based savings accounting. MBCx is thus a measurement-based paradigm which affords improved risk-management by identifying problems and opportunities that are missed with periodic commissioning. The analysis presented in this report is based on in-depth benchmarking of a portfolio of MBCx energy savings for 24 buildings located throughout the University of California and California State University systems. In the course of the analysis, we developed a quality-control/quality-assurance process for gathering and evaluating raw data from project sites and then selected a number of metrics to use for project benchmarking and evaluation, including appropriate normalizations for weather and climate, accounting for variations in central plant performance, and consideration of differences in building types. We performed a cost-benefit analysis of the resulting dataset, and provided comparisons to projects from a larger commissioning 'Meta-analysis' database. A

  12. The Version 2 Global Precipitation Climatology Project (GPCP) Monthly Precipitation Analysis (1979-Present)

    Science.gov (United States)

    Adler, Robert F.; Huffman, George J.; Chang, Alfred; Ferraro, Ralph; Xie, Ping-Ping; Janowiak, John; Rudolf, Bruno; Schneider, Udo; Curtis, Scott; Bolvin, David

    2003-01-01

    The Global Precipitation Climatology Project (GPCP) Version 2 Monthly Precipitation Analysis is described. This globally complete, monthly analysis of surface precipitation at 2.5 degrees x 2.5 degrees latitude-longitude resolution is available from January 1979 to the present. It is a merged analysis that incorporates precipitation estimates from low-orbit-satellite microwave data, geosynchronous-orbit-satellite infrared data, and rain gauge observations. The merging approach utilizes the higher accuracy of the low-orbit microwave observations to calibrate, or adjust, the more frequent geosynchronous infrared observations. The data set is extended back into the premicrowave era (before 1987) by using infrared-only observations calibrated to the microwave-based analysis of the later years. The combined satellite-based product is adjusted by the raingauge analysis. This monthly analysis is the foundation for the GPCP suite of products including those at finer temporal resolution, satellite estimate, and error estimates for each field. The 23-year GPCP climatology is characterized, along with time and space variations of precipitation.

  13. Visual Analysis of Multi-Run Spatio-Temporal Simulations Using Isocontour Similarity for Projected Views.

    Science.gov (United States)

    Fofonov, Alexey; Molchanov, Vladimir; Linsen, Lars

    2016-08-01

    Multi-run simulations are widely used to investigate how simulated processes evolve depending on varying initial conditions. Frequently, such simulations model the change of spatial phenomena over time. Isocontours have proven to be effective for the visual representation and analysis of 2D and 3D spatial scalar fields. We propose a novel visualization approach for multi-run simulation data based on isocontours. By introducing a distance function for isocontours, we generate a distance matrix used for a multidimensional scaling projection. Multiple simulation runs are represented by polylines in the projected view displaying change over time. We propose a fast calculation of isocontour differences based on a quasi-Monte Carlo approach. For interactive visual analysis, we support filtering and selection mechanisms on the multi-run plot and on linked views to physical space visualizations. Our approach can be effectively used for the visual representation of ensembles, for pattern and outlier detection, for the investigation of the influence of simulation parameters, and for a detailed analysis of the features detected. The proposed method is applicable to data of any spatial dimensionality and any spatial representation (gridded or unstructured). We validate our approach by performing a user study on synthetic data and applying it to different types of multi-run spatio-temporal simulation data. PMID:26561458

  14. Federal Education Research and Development for Children and Adolescents: An Analysis of FY 1975 Project Data. Final Report.

    Science.gov (United States)

    Harrell, Adele V.; And Others

    The results of an analysis of the Social Research Group's Fiscal Year 1975 project data as it relates to several educational research and development (R&D) issues are summarized in this report. There are four main chapters. Chapter I covers the R&D projects included in the Interagency Research Information System (IRIS) and reports what kind of…

  15. An analysis of the impact of the thermonuclear pilot project ITER on industry and research in Austria

    International Nuclear Information System (INIS)

    An analysis of the influence of the thermonuclear pilot project ITER on Austrian research and industrial activities is presented in terms of the following subjects: fusion research history, ITER technique, security, nuclear fusion, ITER (reactor, project specifications for quotations), possibilities for Austrian companies and fusion research in Austria. (nevyjel)

  16. Use of Social Network Analysis in Early Phases of ICT Projects

    Directory of Open Access Journals (Sweden)

    Libor Mesicek

    2012-07-01

    Full Text Available According to results of our surveys in 2011 the ICT project managers operating in the Czech Republic would like to have wider possibility of influencing the selection of team members in their projects.The article focuses on the psychological and the sociological aspects of the ICT project teams’ structure, analyzing the existing social networks within a company as well as the concept of the team roles when setting up the project team by mapping the existing relationships among the team members and the possible personality divergence of each employee.The first part of the article summarizes the important milestones for mapping the social networks, the possibility of mapping the network of social relationships, communication channels and relationships in the company, it is focusing on the differences between a team and a work group and the consequences on their functioning.The article represents two surveys results. First one took place among 36 ICT project managers and the second one among visitors of international conference Systems integration 2011. Based on these results, we are presenting a brief description of process design that supports and is important for the ICT team leader’s nominations, as well as for the ICT team members, respecting their relationship structure, results of past cooperation and psychological team roles.The process includes a mapping of a subset of social networks, recommendations of competent managers for the approved project charters based on the output of the analysis, progress and outcomes of finished projects and other relevant business information. The following stage carries the selection and recommendation for individual leaders in regards of the appropriate team members. To ensure the continuous process improvement and preservation of knowledge for the next cycle, the last part is completed by the feedback and evaluation. The proposed process cycle should stress the importance of psychological and

  17. NODC Standard Product: C-CAP Coastal Change Analysis Project - St. Croix estuary region (1985 - 1992) (NODC Accession 0090142)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Coastal Change Analysis Project St. Croix Estuary Region CD-ROM data set uses Landsat Thematic Mapper (TM) imagery from 1985 to 1992 to provide a regional...

  18. The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Hoen, Ben [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Cappers, Peter [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Thayer, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sethi, Gautam [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2009-12-01

    This report uses statistical analysis to evaluate the impact of wind power projects on property values, and fails to uncovers conclusive evidence of the existence of any widespread property value impacts.

  19. Sampling and analysis plan for the preoperational environmental survey for the immobilized low activity waste (ILAW) project W-465

    International Nuclear Information System (INIS)

    This document provides a detailed description of the Sampling and Analysis Plan for the Preoperational Survey to be conducted at the Immobilized Low Activity Waste (ILAW) Project Site in the 200 East Area

  20. Analysis of the effects of Stillwater NWR proposed water management on Newlands Project Operations and Truckee River listed species

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — In response to a change in Stillwater NWR Complex purposes, an analysis was performed to evaluate potential impacts to endangered species and Newlands Project...

  1. Speciation analysis of radionuclides in the environment - NSK-B SPECIATION project report 2009

    International Nuclear Information System (INIS)

    The second stage of the NKS-B project SPECIATION was complemented in 2008-2009, which mainly focus on three aspects: (1) Further improvement and development of methods for speciation analysis of radionuclides; (2) Investigation of speciation of some radionuclides in the environment (water, sediments, particles); and (3) Intercomparison excise for speciation analysis of radionuclides in soil and sediment. This report summarizes the work completed in the project partners' laboratories. Method developments include: Development of an rapid and in-suit separation method for the speciation analysis of 129I in seawater samples; Development of a simple method for the speciation analysis of 129I in fresh water and seawater samples; Development of an on-line HPLC-ICP-MS method for the direct speciation analysis of 127I in water and leachate samples; Speciation of radionuclides in water includes: Speciation of 129I and 127I in time-series precipitation samples collected in Denmark 2001-2006 and its application for the investigation of geochemistry and atmospheric chemistry of iodine, Speciation of radionuclides in Ob and Yenisey Rivers, and Speciation of 129I and 127I in Lake Heimdalen water. Speciation of radionuclides in soils and sediments includes: Sequential extraction of radionuclides in sediments and of trace elements in soil samples. Sequential extraction of radionuclides in aerosols and particles has also been performed. Furthermore, sorption experiments have been performed to investigate the association of Pu, Am and Cs with different geological materials. The intercomparison exercises included sequential extraction of Pu, 137Cs, U, Th, and 129I in one soil and one sediment standard reference materials (NIST-4354, IAEA-375) and Pu in sediment collected from the Lake Heimdalen, Norway. (author)

  2. Fuel integrity project: analysis of light water reactor fuel rods test results

    International Nuclear Information System (INIS)

    BNFL Nuclear Sciences and Technology Services and COGEMA LOGISTICS started in the year 2000 a joint project known as FIP (Fuel Integrity Project) with the aim of developing realistic methods by which the response of LWR fuel under impact accident conditions could be evaluated. To this end BNFL organised tests on both unirradiated and irradiated fuel pin samples and COGEMA LOGISTICS took responsibility for evaluating the test results. Interpretation of test results included simple mechanical analysis as well as simulation by Finite Element Analysis. The first tests that were available for analysis were an irradiated 3 point bending commissioning trial and a lateral irradiated hull compression test, both simulating the loading during a 9 m lateral regulatory drop. The bending test span corresponded roughly to a fuel pin intergrid distance. The outcome of the test was a failure starting at about 35 mm lateral deflection and a few percent of total deformation. Calculations were carried out using the ANSYS code employing a shell and brick model. The hull lateral compaction test corresponds to a conservative compression by neighbouring pins at the upper end of the fuel pin. In this pin region there are no pellets inside. The cladding broke initially into two and later into four parts, all of which were rather similar. Initial calculations were carried out with LS-DYNA3D models. The models used were optimised in meshing, boundary conditions and material properties. The calculation results compared rather well with the test data, in particular for the detailed ANSYS approach of the 3 point bending test, and allowed good estimations of stresses and deformations under mechanical loading as well as the derivation of material rupture criteria. All this contributed to the development of realistic numerical analysis methods for the evaluation of LWR fuel rod behaviour under both normal and accident transport conditions. This paper describes the results of the 3 point bending

  3. Speciation analysis of radionuclides in the environment - NSK-B SPECIATION project report 2009

    Energy Technology Data Exchange (ETDEWEB)

    Hou, X. (Technical Univ. of Denmark, Risoe National Lab. for Sustainable Energy, Roskilde (Denmark)); Aldahan, A. (Uppsala Univ., Dept. of Earth Science (Sweden)); Possnert, G. (Uppsala Univ., Tandem Lab. (Sweden)); Lujaniene, G. (Univ. of Helsinki, Lab. of Radiochemistry (Finland)); Lehto, J. (Institute of Physics (Lithuania)); Skipperud, L.; Lind, O.C.; Salbu, B. (Norwegian Univ. of Life Sciences, Isotope Lab., AAs (Norway))

    2009-10-15

    The second stage of the NKS-B project SPECIATION was complemented in 2008-2009, which mainly focus on three aspects: (1) Further improvement and development of methods for speciation analysis of radionuclides; (2) Investigation of speciation of some radionuclides in the environment (water, sediments, particles); and (3) Intercomparison excise for speciation analysis of radionuclides in soil and sediment. This report summarizes the work completed in the project partners' laboratories. Method developments include: Development of an rapid and in-suit separation method for the speciation analysis of 129I in seawater samples; Development of a simple method for the speciation analysis of 129I in fresh water and seawater samples; Development of an on-line HPLC-ICP-MS method for the direct speciation analysis of 127I in water and leachate samples; Speciation of radionuclides in water includes: Speciation of 129I and 127I in time-series precipitation samples collected in Denmark 2001-2006 and its application for the investigation of geochemistry and atmospheric chemistry of iodine, Speciation of radionuclides in Ob and Yenisey Rivers, and Speciation of 129I and 127I in Lake Heimdalen water. Speciation of radionuclides in soils and sediments includes: Sequential extraction of radionuclides in sediments and of trace elements in soil samples. Sequential extraction of radionuclides in aerosols and particles has also been performed. Furthermore, sorption experiments have been performed to investigate the association of Pu, Am and Cs with different geological materials. The intercomparison exercises included sequential extraction of Pu, 137Cs, U, Th, and 129I in one soil and one sediment standard reference materials (NIST-4354, IAEA-375) and Pu in sediment collected from the Lake Heimdalen, Norway. (author)

  4. An Analysis of Virtual Team Characteristics: A Model for Virtual Project Managers

    Directory of Open Access Journals (Sweden)

    Kathryn Cormican

    2015-04-01

    Full Text Available An integrated model, created to guide project managers, is outlined for the implementation and management of virtual teams. This model is developed by means of an exploratory literature review and an empirical investigation of virtual team utilization in a multinational medical device manufacturer, which examines several factors critical to their success. A TOWS matrix is used to structure the results of the analysis and to identify future virtual team strategies for the organization. The study demonstrates that a structured approach is essential to ensure that the benefits resulting from virtual teamwork are maximized.

  5. Risk Analysis Simulation Model of Economic Evaluation in Hydroelectric Engineering Project

    Directory of Open Access Journals (Sweden)

    Li Cunbin

    2012-07-01

    Full Text Available In this study, we propose a risk analysis simulation model for economic evaluation of hydroelectric engineering project. This model takes annual energy outputs as risk elements. It submits to Pearson-III distribution similar with the annual runoff. Take data from three typical years to estimate the distribution parameters and then yearly benefits can be simulated in given period. By discounting all the annual benefits to their present values and summing them up, the total benefit present value is worked out. Simulating the process for a large number of times, the probability distribution is obtained. And the Net Present Value (NPV distribution can be figured out as well.

  6. The process of life-cycle cost analysis on the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    The Estimating Services Department of the Fernald Environmental Restoration Management Corporation (FERMCO) is formalizing the process of life-cycle cost analysis (LCCA) for the Fernald Environmental Management Project (FEMP). The LCCA process is based on the concepts, principles, and guidelines described by applicable Department of Energy's (DOE) orders, pertinent published literature, and the National Bureau of Standards handbook 135. LCC analyses will be performed following a ten-step process on the FEMP at the earliest possible decision point to support the selection of the least-cost alternatives for achieving the FERMCO mission

  7. Fire hazards analysis for the replacement cross-site transfer system, project W-058

    International Nuclear Information System (INIS)

    The fire hazards analysis assess the risk from fire and determines compliance with the applicable criteria of DOE 5480.7A, DOE 6430.1A, and RLID 5480.7. (Project W-058 will provide encased pipelines to connect the SY Tank Farms in 200 West Area with the tank farms in 200 East Area via an interface with the 244-A lift station. Function of the cross-site transfer system will be to transfer radioactive waste from the SY Tank Farm to treatment, storage, and disposal facilities in 200 East Area.)

  8. Social network analysis aided product development project management: IC Substrates case study

    Directory of Open Access Journals (Sweden)

    Yee Min Chen

    2011-04-01

    Full Text Available This paper proposes the social network analysis (SNA, to study interaction among various activities in a product development process (PDP. The implementation of SNA helps to measure the properties of information flow and identifies PDP activities and limitations. The findings of an exploratory research project which explores the potential of SNA, as an improve tool for visually mapping and analyzing the stakeholders relationships found across the IC substrates design/manufacturing’s PDP of the Unimicron Technology Corp. From the findings, the authors prescribe the necessary SNA recommendations to improve the social conditions within the PDP.

  9. ASEAN-India and ASEAN-Korea FTA: Global Trade Analysis Project

    Directory of Open Access Journals (Sweden)

    Ana Shohibul Manshur Al Ahmad

    2014-04-01

    Full Text Available The aim of this research is to investigate the effects of the free trade agreement between ASEAN-India (AIFTA and ASEAN-Korea (AKFTA. The Computable General Equilibrium (CGE model was applied in this paper with a Global Trade Analysis Project (GTAP database version 8. The GTAP simulations results show that AIFTA provides a greater positive impact than the AKFTA for each region. The greater improvement in terms of welfare, GDP, trade and investment is generated under the AIFTA scheme. Implication of this research is required of any reallocation of resources shared by each country heading on sectors which have a comparative advantage.

  10. Peculiarities of emotional sphere in orphans: analysis through projective drawing test

    Directory of Open Access Journals (Sweden)

    Vetoshkina S.A.

    2015-06-01

    Full Text Available The article provides an analysis of the foreign and national literature in the area of formation and functioning of the orphans’ emotional sphere. The specific conditions in which the development of this category of children occurs ("deprivation" and "non-maternal care" are regarded as a determinant of deviation in the emotional status of children brought up in institutions. The article also contains preliminary data of the author's own research, aimed at studying of features of orphans’ emotional sphere with the help of drawing projective techniques, which are further compared to the data obtained in foreign studies.

  11. Life-cycle cost and financial analysis of energy components in mass housing projects – A case project in sub-urban India

    Directory of Open Access Journals (Sweden)

    Shagufta Sajid Mumtaaz Sayed

    2015-12-01

    Full Text Available Environmental concern based designs are becoming essential in urban India. Shift of population from rural to urban cities is leading to the associated burden of mass housing facilities. The paper discusses the economic feasibility of using energy conservation green components by performing their life cycle cost analysis (LCCA in large mass housing projects. A total of six components including solar applications have been evaluated for a case project placed in Mumbai suburban location in India. LCCA is performed from the projections of Wholesale price indices and wholesale market price fluctuations of the commodities. Labour cost projections are performed from minimum wages provided by the ministry. For calculation of savings, exponential increase in electricity tariff is considered. The capital cost of energy components contributes in the range of 5–7% to the conventional built up area cost. LCCA suggests that the significant share of cost is related to maintenance, repair and replacement activities of all components. Financial analysis results suggest that the components provide a payback of 11 years at 8% discounting rate and 7 years at non discounted values. The results of this study are expected to benefit investors in mass housing projects for their financial and budgetary decision making in implementing energy efficient based design.

  12. Incorporating socio-environmental considerations into project assessment models using multi-criteria analysis: A case study of Sri Lankan hydropower projects

    International Nuclear Information System (INIS)

    Before commissioning any energy projects, conducting robust assessments of different options in terms of their economic and socio-environmental impacts is important for successful project implementation. Yet, there is currently a lack of tools that simultaneously assess sustainability impacts; instead, they are often investigated separately, which gives decision makers somehow disintegrated information. Thus the main objective of this study is to examine how to incorporate socio-environmental considerations into project assessment models. The multi-criteria analysis is applied to the case study of Sri Lankan hydropower projects as an illustrative example. The estimated quantitative relationship between economic, environmental and social impacts of hydropower development is presented in this study. Such estimation, using sustainability indicators of hydropower projects, enables us to understand marginal trade-offs among economic, environmental and social objectives of hydropower development. Hence, this would provide an overview of potential impacts of different scenarios that are designed to be implemented and indicate an optimum mix of hydropower generation. - Highlights: • This study provides an effective hydropower project evaluation method using the MCA. • The proposed tool shows the quantitative relationship explicitly. • Marginal trade-offs between sustainability objectives are presented

  13. Statistical Projections for Multi-resolution, Multi-dimensional Visual Data Exploration and Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Hoa T. [Univ. of Utah, Salt Lake City, UT (United States); Stone, Daithi [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Bethel, E. Wes [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-01-01

    An ongoing challenge in visual exploration and analysis of large, multi-dimensional datasets is how to present useful, concise information to a user for some specific visualization tasks. Typical approaches to this problem have proposed either reduced-resolution versions of data, or projections of data, or both. These approaches still have some limitations such as consuming high computation or suffering from errors. In this work, we explore the use of a statistical metric as the basis for both projections and reduced-resolution versions of data, with a particular focus on preserving one key trait in data, namely variation. We use two different case studies to explore this idea, one that uses a synthetic dataset, and another that uses a large ensemble collection produced by an atmospheric modeling code to study long-term changes in global precipitation. The primary findings of our work are that in terms of preserving the variation signal inherent in data, that using a statistical measure more faithfully preserves this key characteristic across both multi-dimensional projections and multi-resolution representations than a methodology based upon averaging.

  14. UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344.

  15. SPATIAL ANALYSIS BASED HEALTH AND SAFETY RISK ASSESSMENT FOR LINEAR CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    H. Atay

    2012-07-01

    Full Text Available This paper describes an on-going study that aims to develop a web-based spatial decision support system model for proactive health and safety management in linear construction projects. Currently, health and safety management is usually performed reactively instead of proactive management since hazard identification and risk assessment is mostly performed on paper based documents that are not effectively used at site. This leads to accidents and fatalities at construction sites. The proposed system automatically identifies the spatial risks according to the topographic and layout map of the site, project specification and health and safety regulations by means of spatial analysis. It enables the workers and management personnel to access the possible hazards and thematic risk map of any portion of the construction site for linear projects. Finally, the described approach provides the proposed mitigation measures for the identified hazards. The developed system is expected to raise awareness in H&S among workers and engineers, and increase participation of workers to health and safety management.

  16. Hawaii Energy Strategy Project 2: Fossil Energy Review. Task IV. Scenario development and analysis

    Energy Technology Data Exchange (ETDEWEB)

    Yamaguchi, N.D.; Breazeale, K. [ed.

    1993-12-01

    The Hawaii Energy Strategy (HES) Program is a seven-project effort led by the State of Hawaii Department of Business, Economic Development & Tourism (DBEDT) to investigate a wide spectrum of Hawaii energy issues. The East-West Center`s Program on Resources: Energy and Minerals, has been assigned HES Project 2, Fossil Energy Review, which focuses on fossil energy use in Hawaii and the greater regional and global markets. HES Project 2 has four parts: Task I (World and Regional Fossil Energy Dynamics) covers petroleum, natural gas, and coal in global and regional contexts, along with a discussion of energy and the environment. Task II (Fossil Energy in Hawaii) focuses more closely on fossil energy use in Hawaii: current utilization and trends, the structure of imports, possible future sources of supply, fuel substitutability, and energy security. Task III`s emphasis is Greenfield Options; that is, fossil energy sources not yet used in Hawaii. This task is divided into two sections: first, an in-depth {open_quotes}Assessment of Coal Technology Options and Implications for the State of Hawaii,{close_quotes} along with a spreadsheet analysis model, which was subcontracted to the Environmental Assessment and Information Sciences Division of Argonne National Laboratory; and second, a chapter on liquefied natural gas (LNG) in the Asia-Pacific market and the issues surrounding possible introduction of LNG into the Hawaii market.

  17. UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1

    International Nuclear Information System (INIS)

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344

  18. Spatial Analysis Based Health and Safety Risk Assessment for Linear Construction Projects

    Science.gov (United States)

    Atay, H.; Toz, G.

    2012-07-01

    This paper describes an on-going study that aims to develop a web-based spatial decision support system model for proactive health and safety management in linear construction projects. Currently, health and safety management is usually performed reactively instead of proactive management since hazard identification and risk assessment is mostly performed on paper based documents that are not effectively used at site. This leads to accidents and fatalities at construction sites. The proposed system automatically identifies the spatial risks according to the topographic and layout map of the site, project specification and health and safety regulations by means of spatial analysis. It enables the workers and management personnel to access the possible hazards and thematic risk map of any portion of the construction site for linear projects. Finally, the described approach provides the proposed mitigation measures for the identified hazards. The developed system is expected to raise awareness in H&S among workers and engineers, and increase participation of workers to health and safety management.

  19. Spent nuclear fuel project, Cold Vacuum Drying Facility human factors engineering (HFE) analysis: Results and findings

    International Nuclear Information System (INIS)

    This report presents the background, methodology, and findings of a human factors engineering (HFE) analysis performed in May, 1998, of the Spent Nuclear Fuels (SNF) Project Cold Vacuum Drying Facility (CVDF), to support its Preliminary Safety Analysis Report (PSAR), in responding to the requirements of Department of Energy (DOE) Order 5480.23 (DOE 1992a) and drafted to DOE-STD-3009-94 format. This HFE analysis focused on general environment, physical and computer workstations, and handling devices involved in or directly supporting the technical operations of the facility. This report makes no attempt to interpret or evaluate the safety significance of the HFE analysis findings. The HFE findings presented in this report, along with the results of the CVDF PSAR Chapter 3, Hazards and Accident Analyses, provide the technical basis for preparing the CVDF PSAR Chapter 13, Human Factors Engineering, including interpretation and disposition of findings. The findings presented in this report allow the PSAR Chapter 13 to fully respond to HFE requirements established in DOE Order 5480.23. DOE 5480.23, Nuclear Safety Analysis Reports, Section 8b(3)(n) and Attachment 1, Section-M, require that HFE be analyzed in the PSAR for the adequacy of the current design and planned construction for internal and external communications, operational aids, instrumentation and controls, environmental factors such as heat, light, and noise and that an assessment of human performance under abnormal and emergency conditions be performed (DOE 1992a)

  20. YUCCA MOUNTAIN SITE CHARACTERIZATIONS PROJECT TUNNEL BORING MACHINE (TBM) SYSTEM SAFETY ANALYSIS

    International Nuclear Information System (INIS)

    The purpose of this analysis is to systematically identify and evaluate hazards related to the tunnel boring machine (TBM) used in the Exploratory Studies Facility (ESF) at the Yucca Mountain Site Characterization Project. This process is an integral part of the systems engineering process; whereby safety is considered during planning, design, testing, and construction. Since the TBM is an ''as built'' system, the MandO is conducting the System Safety Analysis during the construction or assembly phase of the TBM. A largely qualitative approach was used since a radiological System Safety Analysis is not required. The risk assessment in this analysis characterizes the accident scenarios associated with the TBM in terms of relative risk and includes recommendations for mitigating all identified risks. The priority for recommending and implementing mitigation control features is: (1) Incorporate measures to reduce risks and hazards into the system/subsystem/component design, (2) add safety features and capabilities to existing designs, and (3) develop procedures and conduct training to increase worker awareness of potential hazards, on methods to reduce exposure to hazards, and on the actions required to avoid accidents or correct hazardous conditions. The scope of this analysis is limited to the TBM during normal operations, excluding hazards occurring during assembly and test of the TBM or maintenance of the TBM equipment

  1. Project development for mining-metallurgical complexes for production of uranium concentrates - an analysis and a methodology

    International Nuclear Information System (INIS)

    Activities comprising the development of a project for a mining-metallurgical complex for production of uranium concentrates, from sampling and evaluation of an orebody until plant start-up, are analyzed. The analysis of the orebody, characterization of the ore, bench scale and pilot plant metallurgical studies, environmental studies and economic analyses of the project are described. The mining project and mine preparation and engineering and construction of the plant are reviewed in less detail. The estimated time lapse for the development of a typical project under ideal conditions is 66 months. A bar diagram is included showing an approximate timetable for each activity. (author)

  2. Economic analysis and risk control on project investment of nuclear technology

    International Nuclear Information System (INIS)

    Chinese government had put forward the policy of developing nuclear power in an active way, which will provide vital strategy for energy security, economic development and environment protection. While confronting vital opportunity and challenge of nuclear power development in China, economics is turning to be the foundation of its competition ability in electricity market. To reflect the distinctive economic characteristics of nuclear technology during overall operation life-cycle, an inland nuclear site was taken as conference on project investment for comprehensive analysis between nuclear technologies of AP1000 and M310+ on this paper. According to detailed calculations and analysis, the generation cost and wholesale price of AP1000 are superior to M310+ nuclear technology, and both nuclear technologies had market competition ability comparing with coal power, even on consideration of exterior social cost of spent fuel management and decommissioning. (authors)

  3. Economic Analysis in the Pacific Northwest Land Resources Project: Theoretical Considerations and Preliminary Results

    Science.gov (United States)

    Morse, D. R. A.; Sahlberg, J. T.

    1977-01-01

    The Pacific Northwest Land Resources Inventory Demonstration Project i s an a ttempt to combine a whole spectrum of heterogeneous geographic, institutional and applications elements in a synergistic approach to the evaluation of remote sensing techniques. This diversity is the prime motivating factor behind a theoretical investigation of alternative economic analysis procedures. For a multitude of reasons--simplicity, ease of understanding, financial constraints and credibility, among others--cost-effectiveness emerges as the most practical tool for conducting such evaluation determinatIons in the Pacific Northwest. Preliminary findings in two water resource application areas suggest, in conformity with most published studies, that Lands at-aided data collection methods enjoy substantial cost advantages over alternative techniques. The pntential for sensitivity analysis based on cost/accuracy tradeoffs is considered on a theoretical plane in the absence of current accuracy figures concerning the Landsat-aided approach.

  4. Smoke gas analysis by Fourier transform infrared spectroscopy. The SAFIR project

    Energy Technology Data Exchange (ETDEWEB)

    Hakkarainen, T. [ed.] [VTT Building Technology, Espoo (Finland). Building Physics, Building Services and Fire Technology

    1999-07-01

    The determination of toxic components from fire gases is difficult because the environment is hot, reactions are often temperature dependent, and a lot of soot may be produced. Due to the different properties of the gas components, a different timeconsuming procedure for each species has traditionally been used. The use of FTIR (Fourier Transform InfraRed) spectrometers as a continuous monitoring technique overcomes many of the problems in smoke gas analyses. FTIR offers an opportunity to set up a calibration and prediction method for each gas showing a characteristic spectral band in the infra-red region of the spectrum. The objective of this project was to further develop the FTIR gas analysis of smoke gases to be an applicable and reliable method for the determination of toxic components in combustion gases related to fire test conditions. The project included the following tasks: small scale and large scale sampling; analysis, calibration and software techniques; the verification of the method; and an interlaboratory trial. The optimum probe design, filter parameters and the most suitable sampling lines in terms of flow rate, diameter, construction material and operating temperature have been specified. The gas adsorption onto the filter and the soot have been measured. In the large scale, special concern was given to the probe design and the effects of the probe location in relation to the fire source as well as practical considerations of the sampling line length. Quantitative calibration and prediction methods have been constructed for different components present in smoke gases. Recommendations on how to deal with interferents, non-linearities and outliers have been provided and a verification method for the spectrometer for unexpected variations and for the different models have been described. FTIR measurement procedures in different fire test scenarios have been studied using the recommendations of this project for measurement techniques and analysis

  5. Wind power projects in the CDM: Methodologies and tools for baselines, carbon financing and sustainability analysis

    International Nuclear Information System (INIS)

    The report is intended to be a guidance document for project developers, investors, lenders, and CDM host countries involved in wind power projects in the CDM. The report explores in particular those issues that are important in CDM project assessment and development - that is, baseline development, carbon financing, and environmental sustainability. It does not deal in detail with those issues that are routinely covered in a standard wind power project assessment. The report tests, compares, and recommends methodologies for and approaches to baseline development. To present the application and implications of the various methodologies and approaches in a concrete context, Africa's largest wind farm-namely the 60 MW wind farm located in Zafarana, Egypt- is examined as a hypothetical CDM wind power project The report shows that for the present case example there is a difference of about 25% between the lowest (0.5496 tCO2/MWh) and the highest emission rate (0.6868 tCO2/MWh) estimated in accordance with these three standardized approaches to baseline development according to the Marrakesh Accord. This difference in emission factors comes about partly as a result of including hydroelectric power in the baseline scenario. Hydroelectric resources constitute around 21% of the generation capacity in Egypt, and, if excluding hydropower, the difference between the lowest and the highest baseline is reduced to 18%. Furthermore, since the two variations of the 'historical' baseline option examined result in the highest and the lowest baselines, by disregarding this baseline option altogether the difference between the lowest and the highest is reduced to 16%. The ES3-model, which the Systems Analysis Department at Risoe National Laboratory has developed, makes it possible for this report to explore the project-specific approach to baseline development in some detail. Based on quite disaggregated data on the Egyptian electricity system, including the wind power production

  6. Impact analysis of government investment on water projects in the arid Gansu Province of China

    Science.gov (United States)

    Wang, Zhan; Deng, Xiangzheng; Li, Xiubin; Zhou, Qing; Yan, Haiming

    In this paper, we introduced three-nested Constant Elasticity of Substitution (CES) production function into a static Computable General Equilibrium (CGE) Model. Through four levels of factor productivity, we constructed three nested production function of land use productivity in the conceptual modeling frameworks. The first level of factor productivity is generated by the basic value-added land. On the second level, factor productivity in each sector is generated by human activities that presents human intervention to the first level of factor productivity. On the third level of factor productivity, water allocation reshapes the non-linear structure of transaction among first and second levels. From the perspective of resource utilization, we examined the economic efficiency of water allocation. The scenario-based empirical analysis results show that the three-nested CES production function within CGE model is well-behaved to present the economy system of the case study area. Firstly, water scarcity harmed economic production. Government investment on water projects in Gansu thereby had impacts on economic outcomes. Secondly, huge governmental financing on water projects bring depreciation of present value of social welfare. Moreover, water use for environment adaptation pressures on water supply. The theoretical water price can be sharply increased due to the increasing costs of factor inputs. Thirdly, water use efficiency can be improved by water projects, typically can be benefited from the expansion of water-saving irrigation areas even in those expanding dry area in Gansu. Therefore, increasing governmental financing on water projects can depreciate present value of social welfare but benefit economic efficiency for future generation.

  7. RASOR Project: Rapid Analysis and Spatialisation of Risk, from Hazard to Risk using EO data

    Science.gov (United States)

    Rossi, Lauro; Rudari, Roberto

    2016-04-01

    Over recent decades, there has been a dramatic rise in disasters, and their impact on human populations. Escalation in complexities in our societies is making risks increasingly difficult to understand and changing the ways in which hazards interact with each other. The Rapid Analysis and Spatialisation and Of Risk (RASOR) project developed a multi-hazard risk analysis platform to support the full cycle of disaster management. RASOR provides up-to-date hazard information across floods and geohazards, up-to-date exposure data from known sources and newly-generated EO-based data, and characterised quantitatively their vulnerabilities. RASOR also adapts the newly-developed 12m resolution global TanDEM-X Digital Elevation Model (DEM) to risk management applications, using it as a base layer to develop specific disaster scenarios. RASOR overlays archived and near real-time very high resolution optical and radar satellite data, combined with in situ data for both global and local applications. A scenario-driven query system allows users to project situations into the future and model multi-hazard risk both before and during an event. Applications with regards to different case study sites are presented in order to illustrate the platform potential.

  8. Ocean thermal energy conversion cold water pipe preliminary design project. Task 2. Analysis for concept selection

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-04-01

    The successful performance of the CWP is of crucial importance to the overall OTEC system; the pipe itself is considered the most critical part of the entire operation. Because of the importance the CWP, a project for the analysis and design of CWP's was begun in the fall of 1978. The goals of this project were to study a variety of concepts for delivering cold water to an OTEC plant, to analyze and rank these concepts based on their relative cost and risk, and to develop preliminary design for those concepts which seemed most promising. Two representative platforms and sites were chosen: a spar buoy of a Gibbs and Cox design to be moored at a site off Punta Tuna, Puerto Rico, and a barge designed by APL/Johns Hopkins University, grazing about a site approximately 200 miles east of the coast of Brazil. The approach was to concentrate on the most promising concepts and on those which were either of general interest or espoused by others (e.g., steel and concrete concepts). Much of the overall attention, therefore, focused on analyzing rigid and compliant wall design, while stockade (except for the special case of the FRP stockade) and bottom-mounted concepts received less attention. A total of 67 CWP concepts were initially generated and subjected to a screening process. Of these, 16 were carried through design analysis, costing, and ranking. Study results are presented in detail. (WHK)

  9. The WEST project mechanical analysis of the divertor structure according to the nuclear construction code

    Energy Technology Data Exchange (ETDEWEB)

    Larroque, S., E-mail: sebastien.larroque@cea.fr [CEA Cadarache, IRFM, F-13108 Saint-Paul-lez-Durance (France); Portafaix, C. [ITER Organization, 13108 Saint-Paul-lez-Durance (France); Saille, A.; Doceul, L.; Bucalossi, J.; Samaille, F.; Freslon, S. de [CEA Cadarache, IRFM, F-13108 Saint-Paul-lez-Durance (France)

    2014-10-15

    Highlights: • Divertor structure is mainly loaded by electromagnetical forces. • A simplified FEM analysis give the stresses in the structure. • RCCM criteria are required for the sizing. • Refined finite element models are used for local overstresses. - Abstract: The Tore Supra tokamak is being transformed in an x-point divertor fusion device in the frame of the WEST project, launched in support to the ITER tungsten divertor strategy. The installation of coils inside the vacuum vessel led to the design of a divertor supporting platform able to meet the project requirements and the associated electromagnetic loads. This paper illustrates the design, the method and the results of the thermomechanical elastic stress analyses performed in 2012. The validation of the integrity of the structure is based on the compliance with RCCMR design criteria (even though these Design and Construction rules for Mechanical Components of nuclear installations are not required for such experimental fusion device). Several 3D analyses are performed with the ANSYS code. The major one is a global analysis of half structure which determinates the stresses in the main part of the components. It gives an idea of the areas which needs local analyses. It also provides the interface loads for junction studies or simplified local model.

  10. Performance Refactoring of Instrumentation, Measurement, and Analysis Technologies for Petascale Computing: the PRIMA Project

    Energy Technology Data Exchange (ETDEWEB)

    Malony, Allen D. [Department of Computer and Information Science, University of Oregon; Wolf, Felix G. [Juelich Supercomputing Centre, Forschungszentrum Juelich

    2014-01-31

    The growing number of cores provided by today’s high-end computing systems present substantial challenges to application developers in their pursuit of parallel efficiency. To find the most effective optimization strategy, application developers need insight into the runtime behavior of their code. The University of Oregon (UO) and the Juelich Supercomputing Centre of Forschungszentrum Juelich (FZJ) develop the performance analysis tools TAU and Scalasca, respectively, which allow high-performance computing (HPC) users to collect and analyze relevant performance data – even at very large scales. TAU and Scalasca are considered among the most advanced parallel performance systems available, and are used extensively across HPC centers in the U.S., Germany, and around the world. The TAU and Scalasca groups share a heritage of parallel performance tool research and partnership throughout the past fifteen years. Indeed, the close interactions of the two groups resulted in a cross-fertilization of tool ideas and technologies that pushed TAU and Scalasca to what they are today. It also produced two performance systems with an increasing degree of functional overlap. While each tool has its specific analysis focus, the tools were implementing measurement infrastructures that were substantially similar. Because each tool provides complementary performance analysis, sharing of measurement results is valuable to provide the user with more facets to understand performance behavior. However, each measurement system was producing performance data in different formats, requiring data interoperability tools to be created. A common measurement and instrumentation system was needed to more closely integrate TAU and Scalasca and to avoid the duplication of development and maintenance effort. The PRIMA (Performance Refactoring of Instrumentation, Measurement, and Analysis) project was proposed over three years ago as a joint international effort between UO and FZJ to accomplish

  11. Performance Refactoring of Instrumentation, Measurement, and Analysis Technologies for Petascale Computing. The PRIMA Project

    Energy Technology Data Exchange (ETDEWEB)

    Malony, Allen D. [Univ. of Oregon, Eugene, OR (United States). Dept. of Computer and Information Science; Wolf, Felix G. [Wilhelm-Johnen-Strasse, Julich (Germany). Forschungszentrum Julich GmbH

    2014-01-31

    The growing number of cores provided by today’s high-­end computing systems present substantial challenges to application developers in their pursuit of parallel efficiency. To find the most effective optimization strategy, application developers need insight into the runtime behavior of their code. The University of Oregon (UO) and the Juelich Supercomputing Centre of Forschungszentrum Juelich (FZJ) develop the performance analysis tools TAU and Scalasca, respectively, which allow high-­performance computing (HPC) users to collect and analyze relevant performance data – even at very large scales. TAU and Scalasca are considered among the most advanced parallel performance systems available, and are used extensively across HPC centers in the U.S., Germany, and around the world. The TAU and Scalasca groups share a heritage of parallel performance tool research and partnership throughout the past fifteen years. Indeed, the close interactions of the two groups resulted in a cross-­fertilization of tool ideas and technologies that pushed TAU and Scalasca to what they are today. It also produced two performance systems with an increasing degree of functional overlap. While each tool has its specific analysis focus, the tools were implementing measurement infrastructures that were substantially similar. Because each tool provides complementary performance analysis, sharing of measurement results is valuable to provide the user with more facets to understand performance behavior. However, each measurement system was producing performance data in different formats, requiring data interoperability tools to be created. A common measurement and instrumentation system was needed to more closely integrate TAU and Scalasca and to avoid the duplication of development and maintenance effort. The PRIMA (Performance Refactoring of Instrumentation, Measurement, and Analysis) project was proposed over three years ago as a joint international effort between UO and FZJ to

  12. HTGR reactor physics, thermal-hydraulics and depletion uncertainty analysis: a proposed IAEA coordinated research project

    International Nuclear Information System (INIS)

    The continued development of High Temperature Gas Cooled Reactors (HTGRs) requires verification of HTGR design and safety features with reliable high fidelity physics models and robust, efficient, and accurate codes. The predictive capability of coupled neutronics/thermal hydraulics and depletion simulations for reactor design and safety analysis can be assessed with sensitivity analysis and uncertainty analysis methods. In order to benefit from recent advances in modeling and simulation and the availability of new covariance data (nuclear data uncertainties) extensive sensitivity and uncertainty studies are needed for quantification of the impact of different sources of uncertainties on the design and safety parameters of HTGRs. Uncertainty and sensitivity studies are an essential component of any significant effort in data and simulation improvement. In February 2009, the Technical Working Group on Gas-Cooled Reactors recommended that the proposed IAEA Coordinated Research Project (CRP) on the HTGR Uncertainty Analysis in Modeling be implemented. In the paper the current status and plan are presented. The CRP will also benefit from interactions with the currently ongoing OECD/NEA Light Water Reactor (LWR) UAM benchmark activity by taking into consideration the peculiarities of HTGR designs and simulation requirements. (author)

  13. Rapid, reliable geodetic data analysis for hazard response: Results from the Advanced Rapid Imaging and Analysis (ARIA) project

    Science.gov (United States)

    Owen, S. E.; Simons, M.; Hua, H.; Yun, S.; Cruz, J.; Webb, F.; Rosen, P. A.; Fielding, E. J.; Moore, A. W.; Polet, J.; Liu, Z.; Agram, P. S.; Lundgren, P.

    2013-12-01

    ARIA is a joint JPL/Caltech coordinated project to automate InSAR and GPS imaging capabilities for scientific understanding, hazard response, and societal benefit. Geodetic imaging's unique ability to capture surface deformation in high spatial and temporal resolution allows us to resolve the fault geometry and distribution of slip associated with earthquakes in high spatial & temporal detail. In certain cases, it can be complementary to seismic data, providing constraints on location, geometry, or magnitude that is difficult to determine with seismic data alone. In addition, remote sensing with SAR provides change detection and damage assessment capabilities for earthquakes, floods and other disasters that can image even at night or through clouds. We have built an end-to-end prototype geodetic imaging data system that forms the foundation for a hazard response and science analysis capability that integrates InSAR, high-rate GPS, seismology, and modeling to deliver monitoring, science, and situational awareness products. This prototype incorporates state-of-the-art InSAR and GPS analysis algorithms from technologists and scientists. The products have been designed and a feasibility study conducted in collaboration with USGS scientists in the earthquake and volcano science programs. We will present results that show the capabilities of this data system in terms of latency, data processing capacity, quality of automated products, and feasibility of use for analysis of large SAR and GPS data sets and for earthquake response activities.

  14. Macroalgae Analysis A National GIS-based Analysis of Macroalgae Production Potential Summary Report and Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Roesijadi, Guritno; Coleman, Andre M.; Judd, Chaeli; Van Cleve, Frances B.; Thom, Ronald M.; Buenau, Kate E.; Tagestad, Jerry D.; Wigmosta, Mark S.; Ward, Jeffrey A.

    2011-12-01

    The overall project objective is to conduct a strategic analysis to assess the state of macroalgae as a feedstock for biofuels production. The objective in FY11 is to develop a multi-year systematic national assessment to evaluate the U.S. potential for macroalgae production using a GIS-based assessment tool and biophysical growth model developed as part of these activities. The initial model development for both resource assessment and constraints was completed and applied to the demonstration areas. The model for macroalgal growth was extended to the EEZ off the East and West Coasts of the United States, and a plan to merge the findings for an initial composite assessment was developed. In parallel, an assessment of land-based, port, and offshore infrastructure needs based on published and grey literature was conducted. Major information gaps and challenges encountered during this analysis were identified. Also conducted was an analysis of the type of local, state, and federal requirements that pertain to permitting land-based facilities and nearshore/offshore culture operations

  15. A Parametric Analysis of Project Management Performance to Enhance Software Development Process

    OpenAIRE

    R., Shashikumar N.; Nair, T. R. Gopalakrishnan; V, Suma.

    2014-01-01

    Project Management process plays a significant role in effective development of software projects. Key challenges in the project management process are the estimation of time, cost, defect count, and subsequently selection of apt developers. Therefore precise estimation of above stated factors decides the success level of a project. This paper provides an empirical study of several projects developed in a service oriented software company in order to comprehend the project management process....

  16. IMPORTANCE OF EARNED VALUE METHOD (EVA) IN THE PERFORMANCE ANALYSIS OF PROJECTS

    OpenAIRE

    MARGARITA JANESKA; DEJAN ZDRAVESKI; MARJAN ANGELESKI

    2016-01-01

    The economics of the projects is an important process in the project management. Effective control of projects is based on appropriate methods for monitoring, and the entire project, the timetable, cost, quality and risk. Unlike accounting aspects in project management are looking for information that allow insight into the status and trends of financial progress of the project. Such information provide a method of earned value. It is a key component for assessing the actual perfo...

  17. The analysis of MS Project Server platform for managing of human resources in multiproject environment

    OpenAIRE

    Kadunc, Boštjan

    2009-01-01

    Effective project management requires qualified project managers, who must have complete control over their projects, so they can perform fluently. For easier and more effective project management, we can use various software solutions. In my graduation thesis I focused on working with resources - detecting and resolving their over-allocation. For their regulation I have used Microsoft Office Project Professional 2007 in connection with Microsoft Office Project Server 2007. My goal wa...

  18. The STABALID project: Risk analysis of stationary Li-ion batteries for power system applications

    International Nuclear Information System (INIS)

    This work presents a risk analysis performed to stationary Li-ion batteries within the framework of the STABALID project. The risk analysis had as main objective analysing the variety of hazards and dangerous situations that might be experienced by the battery during its life cycle and providing useful information on how to prevent or manage those undesired events. The first task of the risk analysis was the identification of all the hazards (or risks) that may arise during the battery life cycle. Afterwards, the hazards identified were mapped in the different stages of the battery life cycle and two analyses were performed for each stage: an internal problem analysis and an external peril analysis. For both, the dangerous phenomena and the undesirable events resulting from each hazard was evaluated in terms of probability of occurrence and severity. Then, a risk assessment was carried out according to a predefined risk matrix and a preliminary set of risk mitigation measures were proposed to reduce their probability of occurrence and/or their severity level. The results obtained show that it is possible to reduce the probability of occurrence/severity of all the risks associated to the battery life cycle to acceptable or tolerable levels. - Highlights: • Methodology for a detailed risk analysis of stationary Li-ion batteries. • Various hazards and dangerous situations are analysed with high detail. • Useful information on how to prevent or manage the undesired events is provided. • Measures to reduce probability of occurrence/severity of the risks are presented

  19. Solid waste integrated cost analysis model: 1991 project year report. Part 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    The purpose of the City of Houston`s 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA`s Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  20. Thermal Analysis of a Dry Storage Concept for Capsule Dry Storage Project

    International Nuclear Information System (INIS)

    There are 1,936 cesium (Cs) and strontium (Sr) capsules stored in pools at the Waste Encapsulation and Storage Facility (WESF). These capsules will be moved to dry storage on the Hanford Site as an interim measure to reduce risk. The Cs/Sr Capsule Dry Storage Project is conducted under the assumption that the capsules will eventually be moved to the repository at Yucca Mountain, and the design criteria include requirements that will facilitate acceptance at the repository. The storage system must also permit retrieval of capsules in the event that vitrification of the capsule contents is pursued. The Capsule Advisory Panel (CAP) was created by the Project Manager for the Hanford Site Capsule Dry Storage Project (CDSP). The purpose of the CAP is to provide specific technical input to the CDSP; to identify design requirements; to ensure design requirements for the project are conservative and defensible; to identify and resolve emerging, critical technical issues, as requested; and to support technical reviews performed by regulatory organizations, as requested. The CAP will develop supporting and summary documents that can be used as part of the technical and safety bases for the CDSP. The purpose of capsule dry storage thermal analysis is to: (1) Summarize the pertinent thermal design requirements sent to vendors, (2) Summarize and address the assumptions that underlie those design requirements, (3) Demonstrate that an acceptable design exists that satisfies the requirements, (4) Identify key design features and phenomena that promote or impede design success, (5) Support other CAP analyses such as corrosion and integrity evaluations, and (6) Support the assessment of proposed designs. It is not the purpose of this report to optimize or fully analyze variations of postulated acceptable designs. The present evaluation will indicate the impact of various possible design features, but not systematically pursue design improvements obtainable through analysis

  1. Thermal Analysis of a Dry Storage Concept for Capsule Dry Storage Project

    Energy Technology Data Exchange (ETDEWEB)

    JOSEPHSON, W S

    2003-09-04

    There are 1,936 cesium (Cs) and strontium (Sr) capsules stored in pools at the Waste Encapsulation and Storage Facility (WESF). These capsules will be moved to dry storage on the Hanford Site as an interim measure to reduce risk. The Cs/Sr Capsule Dry Storage Project is conducted under the assumption that the capsules will eventually be moved to the repository at Yucca Mountain, and the design criteria include requirements that will facilitate acceptance at the repository. The storage system must also permit retrieval of capsules in the event that vitrification of the capsule contents is pursued. The Capsule Advisory Panel (CAP) was created by the Project Manager for the Hanford Site Capsule Dry Storage Project (CDSP). The purpose of the CAP is to provide specific technical input to the CDSP; to identify design requirements; to ensure design requirements for the project are conservative and defensible; to identify and resolve emerging, critical technical issues, as requested; and to support technical reviews performed by regulatory organizations, as requested. The CAP will develop supporting and summary documents that can be used as part of the technical and safety bases for the CDSP. The purpose of capsule dry storage thermal analysis is to: (1) Summarize the pertinent thermal design requirements sent to vendors, (2) Summarize and address the assumptions that underlie those design requirements, (3) Demonstrate that an acceptable design exists that satisfies the requirements, (4) Identify key design features and phenomena that promote or impede design success, (5) Support other CAP analyses such as corrosion and integrity evaluations, and (6) Support the assessment of proposed designs. It is not the purpose of this report to optimize or fully analyze variations of postulated acceptable designs. The present evaluation will indicate the impact of various possible design features, but not systematically pursue design improvements obtainable through analysis

  2. DOE responses to Ecology review comments for ''Sampling and analysis plans for the 100-D Ponds voluntary remediation project''

    International Nuclear Information System (INIS)

    The Sampling and Analysis Plan describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds at the Hanford Reservation. This report contains responses by the US Department of Energy to Ecology review for ''Sampling and Analysis Plan for the 100-D Ponds Voluntary Remediation Project.''

  3. YUCCA MOUNTAIN SITE CHARACTERIZATION PROJECT EAST-WEST DRIFT SYSTEM SAFETY ANALYSIS

    International Nuclear Information System (INIS)

    The purpose of this analysis is to systematically identify and evaluate hazards related to the design of the Yucca Mountain Project Exploratory Studies Facility (ESF) East-West Cross Drift. This analysis builds upon prior ESF System Safety Analyses and incorporates TS Main Drift scenarios, where applicable, into the East-West Drift scenarios. This System Safety Analysis (SSA) focuses on the personnel safety and health hazards associated with the engineered design of the East-West Drift. The analysis also evaluates other aspects of the East-West Drift, including purchased equipment (e.g., scientific mapping platform) or Systems/Structures/Components (SSCs) and out-of-tolerance conditions. In addition to recommending design mitigation features, the analysis identifies the potential need for procedures, training, or Job Safety Analyses (JSAs). The inclusion of this information in the SSA is intended to assist the organization(s) (e.g., constructor, Safety and Health, design) responsible for these aspects of the East-West Drift in evaluating personnel hazards and augment the information developed by these organizations. The SSA is an integral part of the systems engineering process, whereby safety is considered during planning, design, testing, and construction. A largely qualitative approach is used which incorporates operating experiences and recommendations from vendors, the constructor and the operating contractor. The risk assessment in this analysis characterizes the scenarios associated with East-West Drift SSCs in terms of relative risk and includes recommendations for mitigating all identified hazards. The priority for recommending and implementing mitigation control features is: (1) Incorporate measures to reduce risks and hazards into SSC designs. (2) Add safety features and capabilities to existing designs. (3) Develop procedures and conduct training to increase worker awareness of potential hazards, reduce exposure to hazards, and inform personnel of the

  4. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  5. Reduced order models for thermal analysis : final report : LDRD Project No. 137807.

    Energy Technology Data Exchange (ETDEWEB)

    Hogan, Roy E., Jr.; Gartling, David K.

    2010-09-01

    This LDRD Senior's Council Project is focused on the development, implementation and evaluation of Reduced Order Models (ROM) for application in the thermal analysis of complex engineering problems. Two basic approaches to developing a ROM for combined thermal conduction and enclosure radiation problems are considered. As a prerequisite to a ROM a fully coupled solution method for conduction/radiation models is required; a parallel implementation is explored for this class of problems. High-fidelity models of large, complex systems are now used routinely to verify design and performance. However, there are applications where the high-fidelity model is too large to be used repetitively in a design mode. One such application is the design of a control system that oversees the functioning of the complex, high-fidelity model. Examples include control systems for manufacturing processes such as brazing and annealing furnaces as well as control systems for the thermal management of optical systems. A reduced order model (ROM) seeks to reduce the number of degrees of freedom needed to represent the overall behavior of the large system without a significant loss in accuracy. The reduction in the number of degrees of freedom of the ROM leads to immediate increases in computational efficiency and allows many design parameters and perturbations to be quickly and effectively evaluated. Reduced order models are routinely used in solid mechanics where techniques such as modal analysis have reached a high state of refinement. Similar techniques have recently been applied in standard thermal conduction problems e.g. though the general use of ROM for heat transfer is not yet widespread. One major difficulty with the development of ROM for general thermal analysis is the need to include the very nonlinear effects of enclosure radiation in many applications. Many ROM methods have considered only linear or mildly nonlinear problems. In the present study a reduced order model is

  6. Evaluation of the Safety Analysis Report for the Waste Isolation Pilot Plant Project

    International Nuclear Information System (INIS)

    The Safety Analysis Report (SAR) for the Waste Isolation Pilot Plant (WIPP) Project was first published by the US Department of Energy (DOE), WIPP Project Office (WPO) in 1980. Since that time a total of eight amendments to this Report have been published. As part of its independent evaluation of the WIPP Project for the State of New Mexico, the Environmental Evaluation Group (EEG) maintains a continuing technical assessment of the information in this Report and its amendments. Beginning with the initial publication, and following the amendments, the EEG prepares detailed written comments and recommendations which are submitted to the WPO for consideration in future amendments. The WPO has made many substantial changes to the SAR in response to the EEG's comments. On frequent occasions, meetings between the two groups have been held in an effort to reach an accord on some of the more controversial issues. These meetings generally have been very constructive, but several important areas of conflict remain. In many instances, these areas represent changes which are to be considered by the WPO at some future date, rather than irreconcilable issues. The most important issues remaining to be resolved are included in the discussions of this report, and could be summarized as follows: (1) An amendment of the topical content to be more in accord with the DOE Order 5481.1A and AL 5481.1A. (2) Substantial revisions of the classification of components, structures and systems, and related quality assurance. (3) Revisions to the site geological and hydrologic data based on studies agreed to between DOE and the State

  7. Fuel Cycle Analysis Framework Base Cases for the IAEA/INPRO GAINS Collaborative Project

    Energy Technology Data Exchange (ETDEWEB)

    Brent Dixon

    2012-09-01

    Thirteen countries participated in the Collaborative Project GAINS “Global Architecture of Innovative Nuclear Energy Systems Based on Thermal and Fast Reactors Including a Closed Fuel Cycle”, which was the primary activity within the IAEA/INPRO Program Area B: “Global Vision on Sustainable Nuclear Energy” for the last three years. The overall objective of GAINS was to develop a standard framework for assessing future nuclear energy systems taking into account sustainable development, and to validate results through sample analyses. This paper details the eight scenarios that constitute the GAINS framework base cases for analysis of the transition to future innovative nuclear energy systems. The framework base cases provide a reference for users of the framework to start from in developing and assessing their own alternate systems. Each base case is described along with performance results against the GAINS sustainability evaluation metrics. The eight cases include four using a moderate growth projection and four using a high growth projection for global nuclear electricity generation through 2100. The cases are divided into two sets, addressing homogeneous and heterogeneous scenarios developed by GAINS to model global fuel cycle strategies. The heterogeneous world scenario considers three separate nuclear groups based on their fuel cycle strategies, with non-synergistic and synergistic cases. The framework base case analyses results show the impact of these different fuel cycle strategies while providing references for future users of the GAINS framework. A large number of scenario alterations are possible and can be used to assess different strategies, different technologies, and different assumptions about possible futures of nuclear power. Results can be compared to the framework base cases to assess where these alternate cases perform differently versus the sustainability indicators.

  8. Self-Correlation Analysis of R Coronae Borealis Stars: A Pilot Project

    Science.gov (United States)

    Percy, J. R.; Bandara, K.; Fernie, J. D.; Cottrell, P. L.; Skuljan, L.

    2004-12-01

    R. Coronae Borealis (RCB) stars are peculiar yellow supergiant stars which suddenly and unpredictably decrease in brightness by up to several magnitudes, then slowly return to normal. Most (perhaps all) RCB stars also pulsate, and the pulsations may be related to the ejection of the dust clouds which produce the fadings. As a pilot project, we have applied self-correlation analysis to two datasets: long-term photometry of R CrB itself by J. D. Fernie, and long-term photometry of several southern RCB stars by P. L. Cottrell, L. Skuljan, and their colleagues. Self-correlation is a simple form of time series analysis which displays the cycle-to-cycle behavior of a variable star, averaged over a dataset. It is especially useful for semi-regular variables. Generally, the seasonal pulsation time scales and amplitudes which we derive are in agreement with Fourier analysis of the same datasets. In the case of R CrB, we confirm that there is apparent mode-switching from season to season.

  9. Project W-320 Tank 106-C waste retrieval study analysis session report

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, J.W.

    1998-03-25

    This supporting document has been prepared to make the Kaiser Engineers Hanford Company Project W-320 Tank 106-C Waste Retrieval Study Analysis Session Report readily retrievable. This facilitated session was requested by Westinghouse Hanford Company (WHC) to review the characterization data and select the best alternatives for a double-shell receiver tank and for a sluicing medium for Tank 106-C waste retrieval. The team was composed of WHC and Kaiser Engineers Hanford Company (KEH) personnel knowledgeable about tank farm operations, tank 106-C requirements, tank waste characterization and analysis, and chemical processing. This team was assembled to perform a structured decision analysis evaluation and recommend the best alternative-destination double-shell tank between tanks 101-AY and 102-AY, and the best alternative sluicing medium among dilute complexant (DC), dilute noncomplexant (DNC), and water. The session was facilitated by Richard Harrington and Steve Bork of KEH and was conducted at the Bookwalter Winery in Richland from 7:30 a.m. to 4:00 p.m. from July 27 through July 29, 1993. Attachment 1 (Scope Statement Sheet) identifies the team members, scope, objectives, and deliverables for the session.

  10. The Barselina Project Phase 4 Summary report. Ignalina Unit 2 Probabilistic Safety Analysis

    International Nuclear Information System (INIS)

    The Barselina Project was initiated in the summer of 1991. The project is a multilateral co-operation between Lithuania, Russia and Sweden. The long range objective is to establish common perspectives and unified bases for assessment of severe accident risks and needs for remedial measures for the RBMK reactors. The Swedish BWR Barsebaeck is used as reference plant and the Lithuanian RBMK Ignalina as application plant. During phase 3, from March, 1993 to June, 1994, a full scope Probabilistic Safety Analysis (PSA) model of the Ignalina Nuclear Power Plant unit 2 (INPP-2) was developed to identify possible safety improvement of risk importance. The probabilistic methodology was applied on a plant specific basis for a channel type reactor of RBMK design. To increase the realism of the risk model a set of deterministic analyses were performed and plant/RBMK-specific data bases were developed and used. A general concept for analysing this type of reactor was developed. During phase 4, July 1994 to September 1996, the PSA was further developed, taking into account plant changes, improved modeling methods and extended plant information concerning dependencies (area events, dynamic effects, electrical and signal dependencies). The updated model is quantified and new results and conclusions are evaluated

  11. The Project "Analysis of Psychological Practice" or: An Attempt at Connecting Psychology Critique and Practice Research

    Directory of Open Access Journals (Sweden)

    Renke Fahl

    1999-11-01

    Full Text Available Using interviews and group discussions, researchers and students from the Free University of Berlin and psychological practitioners work together in a project called 'The Analysis of Psychological Practice', theoretically based on 'Critical Psychology'. The aim is to find out whether and how practitioners deal with the contradictions between experimental-statistical orientation of traditional academic psychology and the single-case-orientation of psychological practice. Can practitioners relate to 'scientific' psychology at all? How do they deal with the contradiction that psychological practitioners are expected to cure psychological problems without having the possibility to change objective conditions with reference to which alone psychological problems are understandable? How are 'official' academic or clinical theories and individual or team-related experiences combined? What can we learn from the explication and development of a 'social-subjective knowledge of the context and contradictions' of professional practitioners of psychology? We discuss theoretical foundations and problems in the empirical development of the project, and resent - from our workshop - three examples or dimensions of our work: life problems, problems of and alternatives to traditional diagnostics, and common sense normative ideas in the guise of psychological theories.

  12. Stress analysis of HLW containers. Preliminary ring test exercise Compas project

    International Nuclear Information System (INIS)

    This document describes the series of experiments and associated calculations performed as the Compas preliminary ring test exercise. A number of mild steel rings, representative of sections through HLW containers, some notched and pre-cracked, were tested in compression right up to and beyond their ultimate load. The Compas project partners independently modelled the behaviour of these rings using their finite element codes. Four different ring types were tested, and each test was repeated three times. For three of the ring types, the three test repetitions gave identical results. The fourth ring, which was not modelled by the partners, had a 4 mm thick layer of weld metal deposited on its surface. The three tests on this ring did not give identical results and suggested that the effect of welding methods should be addressed at a later stage of the project. Fracture was not found to be a significant cause of ring failure. The results of the ring tests were compared with the partners predictions, and additionally some time was spent assessing where the use of the codes could be improved. This exercise showed that the partners codes have the ability to produce results within acceptable limits. Most codes were unable to model stable crack growth. There were indications that some codes would not be able to cope with a significantly more complex three-dimensional analysis

  13. Preliminary safety analysis report for project 89-GEB-610 Plutonium Finishing Plant instrumentation upgrade. Revision 1

    International Nuclear Information System (INIS)

    This document consists of an analysis of the MICON system upgrade. This project shall install a Micon Co. distributed process monitor and control system with Sparc Sun workstation operator interfaces. The Sparc workstations are housed in consoles custom designed to human factors specifications. The distributed control system (DCS) shall have the installed capacity to monitor and control all related instruments and equipment presently connected to the panels in the PFP Power Control Room 321A as listed in the input/output list. This also includes all devices monitored and controlled by the 2736-ZB Allen Bradley programmable logic controller. The system has since assumed the control and monitoring responsibilities for Projects B- 680H ''Low Level Waste Treatment Facility'' and C-031H ''PFP Liquid Effluent Facilities''. Part of the new en's change area in Building 234-5ZA, Room 712, has been remodeled to house two consoles and one supervisor console. Local control units containing the microprocontrollers and the input/output interface circuit boards shall be wired to the instrumentation and controlled equipment. These units communicate with the Sparc workstations via a redundant data communications highway and shall be strategic, throughout the PFP facility. The DCS has already been purchased from Micon Co., located in Houston Texas, presently on site

  14. Analysis on the integration in the educational system of the ICT: institutional projects and permanent training

    Directory of Open Access Journals (Sweden)

    Javier Rodríguez Torres

    2012-11-01

    Full Text Available Throughout this work we wanted to analyze some of the speeches that are implicit or explicit in teacher training on curriculum integration of ICT. This task responds to the discovery of the interests and values that guide rational action and the principles that serve as a framework to develop proposals with ICT and its impact on the professional development of teachers in a school.  We approach the realization of institutional projects for integration into the educational system of ICT and its impact and consequences of teacher education. Projects designed by the agencies and institutions of national and regional level, where analysis and reflection on the role of ICT in education, and more specifically, teacher education does not require addressing the role of these resources from the perspective of innovation and improvement. This is because the dominant discourses in relation to the integration of ICT in education, associate without more, technology and innovation. When this issue is more complex, given the implications that such discourses have on their teaching practices.

  15. Future Arctic marine access: analysis and evaluation of observations, models, and projections of sea ice

    Directory of Open Access Journals (Sweden)

    T. S. Rogers

    2013-02-01

    Full Text Available There is an emerging need for regional applications of sea ice projections to provide more accuracy and greater detail to scientists, national, state and local planners, and other stakeholders. The present study offers a prototype for a comprehensive, interdisciplinary study to bridge observational data, climate model simulations, and user needs. The study's first component is an observationally based evaluation of Arctic sea ice trends during 1980–2008, with an emphasis on seasonal and regional differences relative to the overall pan-Arctic trend. Regional sea ice loss has varied, with a significantly larger decline of winter maximum (January–March extent in the Atlantic region than in other sectors. A lead–lag regression analysis of Atlantic sea ice extent and ocean temperatures indicates that reduced sea ice extent is associated with increased Atlantic Ocean temperatures. Correlations between the two variables are greater when ocean temperatures lag rather than lead sea ice. The performance of 13 global climate models is evaluated using three metrics to compare sea ice simulations with the observed record. We rank models over the pan-Arctic domain and regional quadrants and synthesize model performance across several different studies. The best performing models project reduced ice cover across key access routes in the Arctic through 2100, with a lengthening of seasons for marine operations by 1–3 months. This assessment suggests that the Northwest and Northeast Passages hold potential for enhanced marine access to the Arctic in the future, including shipping and resource development opportunities.

  16. Power Production Analysis of the OE Buoy WEC for the CORES Project

    DEFF Research Database (Denmark)

    Lavelle, John; Kofoed, Jens Peter

    below. This may then be used to estimate the yearly power production of the device at the test site location or another location, by using the long-term wave statistics for the given site. Additionally, the power production for a given scale of device may be estimated by applying the appropriate scaling...... which a total of 39 hours of power production data was collected. A data acquisition system was used to sample the sensors on board and the generator shaft power time-series data was used in the analysis here. A wave-rider buoy, located at the site of OE Buoy and operated by the Marine Institute Ireland...... difficult to determine the efficiency function. The Equimar project deliverable 4.2 (3) describes a method for analysing and presenting the power production data in order to determine the yearly power production of the device at a given location and quantify its uncertainty. The limited amount of power...

  17. Speciation Analysis of Radionuclides in the Environment - NSK-B SPECIATION project report 2009

    DEFF Research Database (Denmark)

    Hou, Xiaolin; Aldahan, Ala; Possnert, Göran;

    , sediments, particles); and (3) Intercomparison excise for speciation analysis of radionu-clides in soil and sediment. This report summarizes the work completed in the project partners’ laboratories, Method developments include: Development of an rapid and in-suit separation method for the speciation....... Speciation of radionuclides in soils and sediments includes: Sequential extraction of radionuclides in sediments and of trace elements in soil samples. Sequential extraction of radionuclides in aerosols and particles has also been performed. Further-more, sorption experiments have been performed to...... investigate the association of Pu, Am and Cs with different geological materials. The intercomparison exercises included sequential extraction of Pu, 137Cs, U, Th, and 129I in one soil and one sediment standard reference materials (NIST-4354, IAEA-375) and Pu in sediment collected from the Lake Heimdalen...

  18. AEP Ohio gridSMART Demonstration Project Real-Time Pricing Demonstration Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Widergren, Steven E.; Subbarao, Krishnappa; Fuller, Jason C.; Chassin, David P.; Somani, Abhishek; Marinovici, Maria C.; Hammerstrom, Janelle L.

    2014-02-01

    This report contributes initial findings from an analysis of significant aspects of the gridSMART® Real-Time Pricing (RTP) – Double Auction demonstration project. Over the course of four years, Pacific Northwest National Laboratory (PNNL) worked with American Electric Power (AEP), Ohio and Battelle Memorial Institute to design, build, and operate an innovative system to engage residential consumers and their end-use resources in a participatory approach to electric system operations, an incentive-based approach that has the promise of providing greater efficiency under normal operating conditions and greater flexibility to react under situations of system stress. The material contained in this report supplements the findings documented by AEP Ohio in the main body of the gridSMART report. It delves into three main areas: impacts on system operations, impacts on households, and observations about the sensitivity of load to price changes.

  19. Structural equation modeling analysis of factors influencing architects' trust in project design teams

    Institute of Scientific and Technical Information of China (English)

    DING Zhi-kun; NG Fung-fai; WANG Jia-yuan

    2009-01-01

    This paper describes a structural equation modeling (SEM) analysis of factors influencing architects' trust in project design teams. We undertook a survey of architects, during which we distributed 193 questionnaires in 29 A-level architectural We used Amos 6.0 for SEM to identify significant personal construct based factors affecting interpersonal trust. The results show that only social interaction between architects significantly affects their interpersonal trust. The explained variance of trust is not very high in the model. Therefore, future research should add more factors into the current model. The practical implication is that team managers should promote the social interactions between team members such that the interpersonal trust level between team members can be improved.

  20. Nondestructive analysis of advanced materials nonlinear behavior using digital projection moiré

    Science.gov (United States)

    Pourvais, Y.; Asgari, P.; Moradi, A. R.; Rahmani, O.

    2014-06-01

    In this paper we use digital projection moiré (DPM) method to analyze the non-linear behavior of sandwich beams with compliant foam core. These cores are highly flexible with respect to the face sheets and their behavior is associated with localized effects in the form of localized displacements and stresses, which in turn influence the overall behavior of sandwich beams. In this study we compare the results of three point bending with Finite Element Analysis (FEA) results that are obtained from the ABAQUS finite element code. We have shown that DPM experimental results are in good agreement with FEA simulations. It is suggested that the presented method can be used as a simple, advantageous and user friendly whole-field testing technique for many applications in evaluation of composite materials and sandwich structures.

  1. Information Technology Project Portfolio and Strategy Alignment Assessment Based on Data Envelopment Analysis

    Directory of Open Access Journals (Sweden)

    Marisa Analía Sánchez

    2012-11-01

    Full Text Available Recent researches have shown that companies face considerable difficulties in assessing the strategy value contribution of Information Technology (IT investments. One of the major obstacles to achieving strategy alignment is that organizations find extremely difficult to link and quantify the IT investments benefits with strategic goals. The aim of this paper is to define an approach to assess portfolio-strategy alignment. To this end a formal specification of Kaplan and Norton Strategy Map is developed utilizing Unified Modeling Language (UML. The approach uses the Strategy Map as a framework for defining the portfolio value contribution and Data Envelopment Analysis (DEA is used as the methodology for measuring efficiency of project portfolios.DOI:10.5585/gep.v3i2.66

  2. Analog Readout and Analysis Software for the Ultra-High Rate Germanium (UHRGe) Project

    International Nuclear Information System (INIS)

    High-resolution high-purity germanium (HPGe) spectrometers are needed for Safeguards applications such as spent fuel assay and uranium hexafluoride cylinder verification. In addition, these spectrometers would be applicable to other high-rate applications such as non-destructive assay of nuclear materials using nuclear resonance fluorescence. Count-rate limitations of today's HPGe technologies, however, lead to concessions in their use and reduction in their efficacy. Large-volume, very high-rate HPGe spectrometers are needed to enable a new generation of nondestructive assay systems. The Ultra-High Rate Germanium (UHRGe) project is developing HPGe spectrometer systems capable of operating at unprecedented rates, 10 to 100 times those available today. This report documents current status of developments in the analog electronics and analysis software.

  3. Analog Readout and Analysis Software for the Ultra-High Rate Germanium (UHRGe) Project

    Energy Technology Data Exchange (ETDEWEB)

    Fast, James E.; Aguayo Navarrete, Estanislao; Evans, Allan T.; VanDevender, Brent A.; Rodriguez, Douglas C.; Wood, Lynn S.

    2011-09-01

    High-resolution high-purity germanium (HPGe) spectrometers are needed for Safeguards applications such as spent fuel assay and uranium hexafluoride cylinder verification. In addition, these spectrometers would be applicable to other high-rate applications such as non-destructive assay of nuclear materials using nuclear resonance fluorescence. Count-rate limitations of today's HPGe technologies, however, lead to concessions in their use and reduction in their efficacy. Large-volume, very high-rate HPGe spectrometers are needed to enable a new generation of nondestructive assay systems. The Ultra-High Rate Germanium (UHRGe) project is developing HPGe spectrometer systems capable of operating at unprecedented rates, 10 to 100 times those available today. This report documents current status of developments in the analog electronics and analysis software.

  4. Project thematic analysis of a Master Program in eLearning from a gender perspective

    OpenAIRE

    Lourdes Guàrdia; Marcelo Maina; Albert Sangrà

    2012-01-01

    Final dissertation projects at UOC’s Master's Program in Education and ICT (eLearning), mainly developed by teachers and trainers, become an illustrative and fascinating collection of papers that aim to make proposals for introducing ICT in education. A thematic analysis, from the perspective of gender, provides interesting data that reveal trends and behaviours regarding the integration of ICT in education, where increasingly, men and women show similarities despite the identified stereotype...

  5. Wind power projects in the CDM: Methodologies and tools for baselines, carbon financing and substainability analysis

    DEFF Research Database (Denmark)

    Ringius, L.; Grohnheit, Poul Erik; Nielsen, Lars Henrik;

    2002-01-01

    the highest and the lowest baselines, by disregarding this baseline option altogether the difference between the lowest and the highest is reduced to 16%. The ES3-model, which the Systems Analysis Department at Risø National Laboratory has developed,makes it possible for this report to explore the project......-specific approach to baseline development in some detail. Based on quite disaggregated data on the Egyptian electricity system, including the wind power production profile of Zafarana, the emissionrates estimated by runs with 1 hour time-steps of the simulation tool ES3 range from 0.590 tCO2/MWh to 0.610 tCO2/MWh...

  6. Final report on LDRD project: Simulation/optimization tools for system variability analysis

    Energy Technology Data Exchange (ETDEWEB)

    R. L. Bierbaum; R. F. Billau; J. E. Campbell; K. D. Marx; R. J. Sikorski; B. M. Thompson; S. D. Wix

    1999-10-01

    >This work was conducted during FY98 (Proposal Number 98-0036) and FY99 (Proposal Number 99-0818) under the auspices of the Sandia National Laboratories Laboratory-Directed Research and Development (LDRD) program. Electrical simulation typically treats a single data point in the very large input space of component properties. For electrical simulation to reach its full potential as a design tool, it must be able to address the unavoidable variability and uncertainty in component properties. Component viability is strongly related to the design margin (and reliability) of the end product. During the course of this project, both tools and methodologies were developed to enable analysis of variability in the context of electrical simulation tools. Two avenues to link relevant tools were also developed, and the resultant toolset was applied to a major component.

  7. Tools to Improve the Process of Engineering Design: An Analysis of Team Configuration and Project Support

    OpenAIRE

    Smith, Paige Elizabeth

    2004-01-01

    The purpose of this research was to determine how team design and project management (planning and tracking) affected planning and design performance and the people involved in the process. A laboratory study was conducted to evaluate three factors: team design (individuals versus groups of three), project support (no project support versus manual project support versus automated project support), and the engineering design life-cycle, which includes conceptual design, preliminary design, an...

  8. ANALYSIS OF THE POSSIBILITY FOR ESTABLISHING PROJECT MANAGEMENT OFFICE (PMO) IN COMPANIES IN SERBIA

    OpenAIRE

    Dragana Milin; Slobodan Morača; Nikola Radaković; Sabahudin Jašarević; Miodrag Hadžistević

    2012-01-01

    Project Management Office (PMO) is an organizational unit established to help project managers, project teams and the various levels of management in carrying out the principles of project management. The research was carried out in Serbia, in 2011, with the aim to establish which methodologies and techniques are used for project m anagement, and which of them are used the most frequently. Furthermore, the need for establishment of PMOs in Serbia is discussed. These offices should help in est...

  9. The AAL project: automated monitoring and intelligent analysis for the ATLAS data taking infrastructure

    Science.gov (United States)

    Kazarov, A.; Lehmann Miotto, G.; Magnoni, L.

    2012-06-01

    The Trigger and Data Acquisition (TDAQ) system of the ATLAS experiment at CERN is the infrastructure responsible for collecting and transferring ATLAS experimental data from detectors to the mass storage system. It relies on a large, distributed computing environment, including thousands of computing nodes with thousands of application running concurrently. In such a complex environment, information analysis is fundamental for controlling applications behavior, error reporting and operational monitoring. During data taking runs, streams of messages sent by applications via the message reporting system together with data published from applications via information services are the main sources of knowledge about correctness of running operations. The flow of data produced (with an average rate of O(1-10KHz)) is constantly monitored by experts to detect problem or misbehavior. This requires strong competence and experience in understanding and discovering problems and root causes, and often the meaningful information is not in the single message or update, but in the aggregated behavior in a certain time-line. The AAL project is meant at reducing the man power needs and at assuring a constant high quality of problem detection by automating most of the monitoring tasks and providing real-time correlation of data-taking and system metrics. This project combines technologies coming from different disciplines, in particular it leverages on an Event Driven Architecture to unify the flow of data from the ATLAS infrastructure, on a Complex Event Processing (CEP) engine for correlation of events and on a message oriented architecture for components integration. The project is composed of 2 main components: a core processing engine, responsible for correlation of events through expert-defined queries and a web based front-end to present real-time information and interact with the system. All components works in a loose-coupled event based architecture, with a message broker

  10. The AAL project: automated monitoring and intelligent analysis for the ATLAS data taking infrastructure

    International Nuclear Information System (INIS)

    The Trigger and Data Acquisition (TDAQ) system of the ATLAS experiment at CERN is the infrastructure responsible for collecting and transferring ATLAS experimental data from detectors to the mass storage system. It relies on a large, distributed computing environment, including thousands of computing nodes with thousands of application running concurrently. In such a complex environment, information analysis is fundamental for controlling applications behavior, error reporting and operational monitoring. During data taking runs, streams of messages sent by applications via the message reporting system together with data published from applications via information services are the main sources of knowledge about correctness of running operations. The flow of data produced (with an average rate of O(1-10KHz)) is constantly monitored by experts to detect problem or misbehavior. This requires strong competence and experience in understanding and discovering problems and root causes, and often the meaningful information is not in the single message or update, but in the aggregated behavior in a certain time-line. The AAL project is meant at reducing the man power needs and at assuring a constant high quality of problem detection by automating most of the monitoring tasks and providing real-time correlation of data-taking and system metrics. This project combines technologies coming from different disciplines, in particular it leverages on an Event Driven Architecture to unify the flow of data from the ATLAS infrastructure, on a Complex Event Processing (CEP) engine for correlation of events and on a message oriented architecture for components integration. The project is composed of 2 main components: a core processing engine, responsible for correlation of events through expert-defined queries and a web based front-end to present real-time information and interact with the system. All components works in a loose-coupled event based architecture, with a message broker

  11. Site Productivity and Forest Carbon Stocks in the United States: Analysis and Implications for Forest Offset Project Planning

    OpenAIRE

    Smith, James E.; Coeli M. Hoover

    2012-01-01

    The documented role of United States forests in sequestering carbon, the relatively low cost of forest-based mitigation, and the many co-benefits of increasing forest carbon stocks all contribute to the ongoing trend in the establishment of forest-based carbon offset projects. We present a broad analysis of forest inventory data using site quality indicators to provide guidance to managers planning land acquisition for forest-based greenhouse gas mitigation projects. Specifically, we summariz...

  12. Environmental risk analysis for accidental emissions. Recommendations of the YMPAeRI project; Haeirioepaeaestoejen ympaeristoeriskianalyysi. YMPAeRI-hankkeen suositukset

    Energy Technology Data Exchange (ETDEWEB)

    Wessberg, N.; Seppaelae, J.; Molarius, R.; Koskela, S.; Pennanen, J.; Silvo, K.; Kekoni, P.

    2006-07-01

    The management of accidental emissions is risk management where risk analysis plays a major role. Risks are identified and assessed in risk analysis. The most valuable results of risk analysis are the proposals for actions to improve risk management. The topic of this report is the environmental risk assessment of accidental emissions in industrial sites. Environmental risk analysis for accidental emission is an essential part of corporate environmental risk management. However, there have not been harmonious ecommendations of how environmental risks should be assessed and how environmental risk analysis should be made. In the YMPAeRI project such guidelines was created and terminology was clarified. Co-operation between Safety Technology Authority, Finnish Environment Institute and VTT, as well as interviews and workshops, offered a forum for different interests, opinions and experiences to come together in the YMPAeRI project. Authorities, consultants, certification bodies and companies could influence the process. Recommendations were made based on this interactive process. Guidelines made in the project show what environmental risk analysis should include and how the process of risk analysis should go. They are strongly based on industrial safety's risk analysis techniques and traditions. Consequence matrix and risk matrix also provide guidelines to the decision making of risk tolerability and acceptance. The YMPAeRI recommendations will be tested in reality in the future. The most important parts of the guidelines, the checklist of environmental risk analysis, the consequence matrix and risk matrix will be updated in the internet of environmental administration. (orig.)

  13. Tourism Chains and Pro-Poor Tourism Development: An Actor-Network Analysis of a Pilot Project in Costa Rica

    OpenAIRE

    Duim, van der, V.R.; Caalders, J.D.A.D.

    2008-01-01

    This paper analyses a pilot project in Costa Rica aimed to examine and improve the market linkages of 24 small-scale tourism initiatives to tour operators in Costa Rica and the Netherlands. It links pro-poor tourism and the concept of tourism chain to actor-network theory. The analysis shows that the tangible results in terms of pro-poor tourism of the project itself were meagre, as, initially, only three and later only one out of 24 projects was included in the tourism chain. However, the an...

  14. The numerical simulation and analysis of three-dimensional seawater intrusion and protection projects in porous media

    Institute of Scientific and Technical Information of China (English)

    2009-01-01

    For the three-dimensional seawater intrusion and protection system, the model of dynamics of fluids in porous media and the modified upwind finite difference fractional steps schemes are put forward. Based on the numerical simulation of the practical situation in the Laizhou Bay Area of Shandong Province, predictive numerical simulation and analysis of the consequence of protection projects, underground dams, tidal barrage projects and the applied modular form of project adjustment have been finished. By using the theory and techniques of differential equation prior estimates, the convergence results have been got.

  15. Low-Cost Mapping and Publishing Methods for Landscape Architectural Analysis and Design in Slum-Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Jörg Rekittke

    2011-10-01

    Full Text Available The research project “Grassroots GIS” focuses on the development of low-cost mapping and publishing methods for slums and slum-upgrading projects in Manila. In this project smartphones, collaborative mapping and 3D visualization applications are systematically employed to support landscape architectural analysis and design work in the context of urban poverty and urban informal settlements. In this paper we focus on the description of the developed methods and present preliminary results of this work-in-progress.

  16. Collection and analysis of high-resolution elevation data for the Lincoln Lidar Project, Lincoln, Nebraska, 2004

    Science.gov (United States)

    Stoker, Jason M.; Greenlee, Susan K.; Gesch, Dean B.; Hubl, Erik J.; Axmann, Ryan N.

    2005-01-01

    The Lincoln Lidar Project was a partnership developed between the U.S. Geological Survey National Center for Earth Resources Observations and Science (EROS), Lancaster County and the city of Lincoln, Nebraska. This project demonstrated a successful planning, collection, analysis and integration of high-resolution elevation information using Light Detection and Ranging, (Lidar) data. This report describes the partnership developed to collect local Lidar data and transform the data into information useable at local to national levels. This report specifically describes project planning, quality assurance, processing, transforming raw Lidar points to useable data layers, and visualizing and disseminating the raw and final products.

  17. Mexsyco project: representation of power plan control-instrumentation functions. Bibliographical analysis and conclusions

    International Nuclear Information System (INIS)

    The study covered in this paper is designed to review the current situation in terms of functional analysis, in order to find a functional analysis method for mechanical parts able to serve as a substrate for expressing operating safety constraints, time-related performance or any other tag of function description. This paper comprises three parts: The first is devoted to general notions of the formats used by the various functional analyses. It attempts to explain the three types of format: behavioural, structural and functional. It tackles the notions of trees and bottom-up and top-down approaches. It proposes examining the link between the expected functions of the systems and the hardware supporting these functions. It attempts to make a distinction between ''operators'' and ''operands'' enabling the notion of object to be linked to that of the three types of format seen above. It ends with a reminder of the distinction between semi-formal and formal. The second part analyses the current situation of functional analysis of the mechanical and control-instrumentation parts of power production plants, through a bibliographical search. The results of this second part are however disappointing. The purpose of the third part of the study is a prototype format built up from the considerations of the first two parts. This format meets our requirements better than those of the bibliographical analysis, but it could doubtless be improved: application of this format to RCV highlights its advantages, but also underlines the improvements needed. Given the deadlines of the Mexsyco project, the decision was taken to suspend development of this format for the time being and use a method currently being produced and based on use of the current functional breakdown (basic plant systems) and of a modular tree-structure representation of the control-instrumentation of a basic plant system. (author). 12 refs., 4 annexes

  18. ICDE project report on collection and analysis of common-cause failures of centrifugal pumps

    International Nuclear Information System (INIS)

    Several member countries of OECD/NEA decided to establish the International Common-Cause Failure Data Exchange (ICDE) Project to encourage multilateral co-operation in the collection and analysis of data relating to Common-Cause Failure (CCF) events. The project was initiated in August 1994 in Sweden and was discussed at meetings in both Sweden and France in 1995. A coding benchmark exercise was defined which was evaluated at meetings held in Germany and in the US in 1996. Subsequently, the exchange of centrifugal pump data was defined; the first phase of this exchange was evaluated at meetings in Switzerland and in France in 1997. The objectives of the ICDE Project are: - to collect and analyse CCF events in the long term so as to better understand such events, their causes, and their prevention, - to generate qualitative insights into the root causes of CCF events which can then be used to derive approaches or mechanisms for their prevention or for mitigating their consequences, - to establish a mechanism for the efficient feedback of experience gained on CCF phenomena, including the development of defences against their occurrence, such as indicators for risk based inspections. The ICDE Project is envisaged as including all possible events of interest, comprising complete, partial and incipient CCF events, called 'ICDE events' in the following. The Project covers the key components of the main safety systems, like centrifugal pumps, diesel generators, motor operated valves, power operated relief valves, safety relief valves, check valves, RPS circuit breakers, batteries and transmitters. Data are collected in an MS ACCESS based databank implemented and maintained at ES-Konsult, Sweden, by NEA appointed clearinghouse. The databank is regularly updated. The clearinghouse and the project group operate it. In the modelling of common-cause failures in systems consisting of several redundant components, two kinds of events are distinguished: a) Unavailability of a

  19. Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop

    Energy Technology Data Exchange (ETDEWEB)

    Galarowicz, James

    2014-01-06

    In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project team’s work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA

  20. ANALYSIS OF THE POSSIBILITY FOR ESTABLISHING PROJECT MANAGEMENT OFFICE (PMO IN COMPANIES IN SERBIA

    Directory of Open Access Journals (Sweden)

    Dragana Milin

    2012-09-01

    Full Text Available Project Management Office (PMO is an organizational unit established to help project managers, project teams and the various levels of management in carrying out the principles of project management. The research was carried out in Serbia, in 2011, with the aim to establish which methodologies and techniques are used for project m anagement, and which of them are used the most frequently. Furthermore, the need for establishment of PMOs in Serbia is discussed. These offices should help in establishing a standardized methodology (at the organization level and thus overcome the obviou s poor use of any project management methodology at all.

  1. An Analysis Of The Recommended Knowledge For The Software Project Management Discipline

    OpenAIRE

    Araujo, Jonathan

    2014-01-01

    According to the PMBOK (Project Management Body of Knowledge), project management is “the application of knowledge, skills, tools, and techniques to project activities to meet the project requirements” [1]. Project Management has proven to be one of the most important disciplines at the moment of determining the success of any project [2][3][4]. Given that many of the activities covered by this discipline can be said that are “horizontal” for any kind of domain, the importance of acknowledge ...

  2. Stakeholder Analysis as a Medium to Aid Change in Information System Reengineering Projects

    Directory of Open Access Journals (Sweden)

    Jean Davison

    2004-04-01

    Full Text Available The importance of involving stakeholders within a change process is well recognised, and successfully managed change is equally important. Information systems development and redesign is a form of change activity involving people and social issues and therefore resistance to change may occur. A stakeholder identification and analysis (SIA technique has been developed as an enhancement to PISO® (Process Improvement for Strategic Objectives, a method that engages the users of a system in the problem solving and reengineering of their own work-based problem areas. The SIA technique aids the identification and analysis of system stakeholders, and helps view the projected outcome of system changes and their effect on relevant stakeholders with attention being given to change resistance to ensure smooth negotiation and achieve consensus. A case study is presented here describing the successful implementation of a direct appointment booking system for patients within the National Health Service in the UK, utilising the SIA technique, which resulted in a feeling of empowerment and ownership of the change of those involved.

  3. Can molecular projected density of states (PDOS be systematically used in electronic conductance analysis?

    Directory of Open Access Journals (Sweden)

    Tonatiuh Rangel

    2015-06-01

    Full Text Available Using benzenediamine and benzenedithiol molecular junctions as benchmarks, we investigate the widespread analysis of the quantum transport conductance in terms of the projected density of states (PDOS onto molecular orbitals (MOs. We first consider two different methods for identifying the relevant MOs: (1 diagonalization of the Hamiltonian of the isolated molecule and (2 diagonalization of a submatrix of the junction Hamiltonian constructed by considering only basis elements localized on the molecule. We find that these two methods can lead to substantially different MOs and hence PDOS. Furthermore, within Method 1, the PDOS can differ depending on the isolated molecule chosen to represent the molecular junction (e.g., with or without dangling bonds; within Method 2, the PDOS depends on the chosen basis set. We show that these differences can be critical when the PDOS is used to provide a physical interpretation of the conductance (especially when its value is small, as it happens typically at zero bias. In this work, we propose a new approach in an attempt to reconcile the two traditional methods. Although some improvements were achieved, the main problems remain unsolved. Our results raise more general questions and doubts on a PDOS-based analysis of the conductance.

  4. UMTRA Project water sampling and analysis plan, Gunnison, Colorado: Revision 1

    International Nuclear Information System (INIS)

    This water sampling and analysis plan summarizes the results of previous water sampling activities and the plan for future water sampling activities, in accordance with the Guidance Document for Preparing Sampling and Analysis Plans for UMTRA Sites. A buffer zone monitoring plan for the Dos Rios Subdivision is included as an appendix. The buffer zone monitoring plan was developed to ensure continued protection to the public from residual contamination. The buffer zone is beyond the area depicted as contaminated ground water due to former milling operations. Surface remedial action at the Gunnison Uranium Mill Tailings Remedial Action Project site began in 1992; completion is expected in 1995. Ground water and surface water will be sampled semiannually at the Gunnison processing site and disposal site. Results of previous water sampling at the Gunnison processing site indicate that ground water in the alluvium is contaminated by the former uranium processing activities. Background ground water conditions have been established in the uppermost aquifer at the Gunnison disposal site. The monitor well locations provide a representative distribution of sampling points to characterize ground water quality and ground water flow conditions in the vicinity of the sites. The list of analytes has been modified with time to reflect constituents that are related to uranium processing activities and the parameters needed for geochemical evaluation

  5. Sampling and analysis plan for the 100-D Ponds voluntary remediation project

    International Nuclear Information System (INIS)

    This Sampling and Analysis Plan (SAP) describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds Resource Conservation and Recovery Act (RCRA) treatment, storage, and/or disposal (TSD) unit. This SAP includes the Field Sampling Plan (FSP) presented in Section 2.0, and the Quality Assurance Project Plan (QAPjP) described in Section 3.0. The FSP defines the sampling and analytical methodologies to be performed, and the QAPjP provides or includes information on the requirements for precision, accuracy, representativeness, comparability, and completeness of the analytical data. This sampling and analysis plan was developed using the Environmental Protection Agency's Seven-Step Data Quality Objectives (DQO) Guidance (EPA, 1994). The purpose of the DQO meetings was (1) to identify the contaminants of concern and their cleanup levels under the Washington State Model Toxics Control Act (MTCA, WAC-173-340) Method B, and (2) to determine the number and locations of samples necessary to verify that the 100-D Ponds meet the cleanup criteria. The data collected will be used to support RCRA closure of this TSD unit

  6. Analysis and Projection of the Relationship between Industrial Structure and Land Use Structure in China

    Directory of Open Access Journals (Sweden)

    Qin Jin

    2014-12-01

    Full Text Available Based on the computable general equilibrium (CGE modelling method, this research analyzes the relationship between industrial structure and land use structure in China. The results show that our model is feasible, and the simulation results are of a certain stability. Under the scenario analysis and projection of the relationship between the industrial structure and land use structure of the thirty-one provinces in China from 2010 to 2020, the proportions of secondary and tertiary industry in each province have been increasing; correspondingly, the proportion of agriculture has been decreasing. This means that the industrial structure of China is changing. As for land use, in general, the trend is similar to the industrial structure changes. The transformation of the structure of industrial development and land use has driven economic structure changes in China. The economic structure has an inclination to transform from agriculture to both secondary and tertiary industry. Along with industrial transformation, the cultivated land in China shows a trend of continuous decline. Empirical analysis results indicate that a decrease of cultivated land is acceptable under the scenario of economic growth in the next ten years. This shows a possibility that the economic efficiency of land use for cultivation and business services will decline, and more attention ought to be paid to increasing the economic efficiency of land use.

  7. Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the §1603 Treasury Grant Program

    Energy Technology Data Exchange (ETDEWEB)

    Steinberg, Daniel [National Renewable Energy Lab. (NREL), Golden, CO (United States); Porro, Gian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Goldberg, Marshall [MRG & Associates, Nevada City, CA (United States)

    2012-04-09

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the §1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the §1603 grant program.

  8. Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the §1603Treasury Grant Program

    Energy Technology Data Exchange (ETDEWEB)

    Steinberg, Daniel [National Renewable Energy Lab. (NREL), Golden, CO (United States); Porro, Gian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Goldberg, Marshall [MRG and Associates, New York, NY (United States)

    2012-04-01

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the §1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the §1603 grant program.

  9. Preliminary Analysis of the Jobs and Economic Impacts of Renewable Energy Projects Supported by the ..Section..1603 Treasury Grant Program

    Energy Technology Data Exchange (ETDEWEB)

    Steinberg, D.; Porro, G.; Goldberg, M.

    2012-04-01

    This analysis responds to a request from the Department of Energy Office of Energy Efficiency and Renewable Energy to the National Renewable Energy Laboratory (NREL) to estimate the direct and indirect jobs and economic impacts of projects supported by the Section 1603 Treasury grant program. The analysis employs the Jobs and Economic Development Impacts (JEDI) models to estimate the gross jobs, earnings, and economic output supported by the construction and operation of the large wind (greater than 1 MW) and solar photovoltaic (PV) projects funded by the Section 1603 grant program.

  10. Guidelines for retrospective safety analysis. Prepared for DRIVE II Project V2002 Horizontal Project for the Evaluation of Safety HOPES.

    OpenAIRE

    Oppe, S.

    1994-01-01

    This report contains the following contributions: Concepts and definitions (Oppe, S); Traffic in its social context (Chaloupka, C and Risser, R); The checklist as a retrospective safety tool (Chaloupka, C and Risser, R); Experimental design (Kulmala, R); Evaluation of the traffic process and its safety effects (Oppe, S); Methods for process evaluation (Steyvers, FJJM); Methods for product evaluation (Oppe, S); Accident analysis (Oppe, S); Time related models (Oppe, S); Behavioural models (Ste...

  11. ANALYSIS OF PROJECTED FREQUENCY AND INTENSITY CHANGES OF PRECIPITATION IN THE CARPATHIAN REGION

    Directory of Open Access Journals (Sweden)

    KIS ANNA

    2015-03-01

    Full Text Available Precipitation is the major atmospheric source of surface water, thus, in order to build appropriate adaptation strategies for various economic sections related to water resources it is essential to provide projections for precipitation tendencies as exact as possible. Extreme precipitation events are especially important from this point of view since they may result in different environmental, economical, and/or even human health damages. Excessive precipitation for instance may induce floods, flash-floods, landslides, traffic accidents. On the other hand, lack of precipitation is not favorable either: long dry periods affect agricultural production quite negatively, and hence, food safety can be threatened. Several precipitation-related indices (i.e., describing drought or intensity, exceeding different percentile-based or absolute threshold values are analyzed for the Carpathian region for 1961–2100. For this purpose 11 completed regional climate model simulations are used from the ENSEMBLES database. Before the thorough analysis, a percentile-based bias correction method was applied to the raw data, for which the homogenized daily gridded CarpatClim database (1961–2010 served as a reference. Absolute and relative seasonal mean changes of climate indices are calculated for two future time periods (2021–2050 and 2071–2100 and for three subregions within the entire Carpathian region, namely, for Slovakia, Hungary and Romania. According to our results, longer dry periods are estimated for the summer season, mainly in the southern parts of the domain, while precipitation intensity is likely to increase. Heavy precipitation days and high percentile values are projected to increase, especially, in winter and autumn.

  12. Hydrologic analysis of the proposed Badger-Beaver Creeks Artificial-Recharge Project : Morgan County, Colorado

    Science.gov (United States)

    Burns, Alan W.

    1980-01-01

    A hydrologic analysis of the proposed Badger-Beaver Creeks artificial-recharge project in Morgan County, Colo., was made with the aid of three digital computer models: A canal-distribution model, a ground-water flow model, and a stream-aquifer model. Statistical summaries of probable diversions from the South Platte River based on a 27-year period of historical flows indicate that an average-annual diversion of 96,000 acre-feet and a median-annual diversion of 43,000 acre-feet would be available. Diversions would sustain water in ponds for waterfowl habitat for an average of about five months per year, with a miximum pond surface area of about 300 acres with the median diversions and a maximum pond surface area of about 1,250 acres at least one-half of the years with the historic diversions. If the annual diversion were 43,000 acre-feet, recharge to the two alluvial aquifers would raise water levels sufficiently to create flowing streams in the channels of Beaver and Badger Creeks while allowing an increase in current ground-water pumping. The only area of significant waterlogging would be along the proposed delivery canal on the west edge of Badger Creek valley. If the total water available were diverted, the aquifer system could not transmit the water fast enough to the irrigation areas to avoid considerable waterlogging in the recharge areas. The impact of the proposed project on the South Platte River basin would be minimal once the ground-water system attained steady-state conditions, but that may take decades with a uniform diversion of the 43,000 acre-feet annually. (USGS)

  13. The need for complementary hydraulic analysis in post-restoration monitoring of river restoration projects

    OpenAIRE

    T. A. Endreny; M. M. Soulman

    2011-01-01

    River restoration design methods are incrementally improved by studying and learning from monitoring data in previous projects. In this paper, we report post-restoration monitoring data for a Natural Channel Design (NCD) restoration project along 1600 m (10 channel wavelengths) of the Batavia Kill in the Catskill Mountains, NY, implemented in 2001 and 2002. The NCD project used a reference-reach to determine channel form, empirical relations between the project site and reference site bankful...

  14. Use of Social Network Analysis in Early Phases of ICT Projects

    OpenAIRE

    Libor Mesicek; Jiri Svoboda

    2012-01-01

    According to results of our surveys in 2011 the ICT project managers operating in the Czech Republic would like to have wider possibility of influencing the selection of team members in their projects.The article focuses on the psychological and the sociological aspects of the ICT project teams’ structure, analyzing the existing social networks within a company as well as the concept of the team roles when setting up the project team by mapping the existing relationships among the team member...

  15. The Cycle life analysis as a tool for sustainability in water treatment projects

    OpenAIRE

    González Benítez, María Margarita; Guardino Ferré, Ramón; Calderon Iglesias, Ruben; Gràcia Villar, Santos

    2014-01-01

    The Life Cycle Assessment (LCA) is a standardised tool for sustainability, recognized in many international forums, applicable to water treatment projects, but not usually applied to this type of projects. The LCA should be included into this type of projects since it allows making strategic decisions from the study of sustainability at different stages of the project, compares water purification technologies and its phases, and allows optimizing processes and determining the overall impact o...

  16. ANALYSIS OF PROJECT PORTFOLIO MANAGEMENT MATURITY: THE CASE OF A SMALL FINANCIAL INSTITUTION

    OpenAIRE

    Karoline Doro Alves Carneiro; Cristina Dai Prá Martens

    2012-01-01

    This study explores the implementation of project portfolio management in the organizational context. The objective is to analyze the methodology of project portfolio management adopted by an organization based in the project portfolio management maturity model proposed by Rad and Levin (2006). We developed an exploratory case study in a small financial institution that experienced problems with the implementation of its methodology in project portfolio management. As a result of study, we fo...

  17. Analysis of the efficiency of some international projects in Ukraine for future of nuclear energy

    International Nuclear Information System (INIS)

    The report presents the review of the status and perspectives for nuclear energy development in Ukraine. The role of certain projects for young experts is evaluated - among these projects the basic one is the IAEA Technical Co-operation Project UKR/4/006 Strategy for Nuclear Energy Development, as well as projects of the Ukrainian Nuclear Society and the Institute of Nuclear and Energy Law. (authors)

  18. An analysis of European riverine flood risk and adaptation measures under projected climate change

    Science.gov (United States)

    Bouwer, Laurens; Burzel, Andreas; Holz, Friederike; Winsemius, Hessel; de Bruijn, Karind

    2015-04-01

    There is increasing need to assess costs and benefits of adaptation at scales beyond the river basin. In Europe, such estimates are required at the European scale in order to set priorities for action and financing, for instance in the context of the EU Adaptation Strategy. The goal of this work as part of the FP7 BASE project is to develop a flood impact model that can be applied at Pan-European scale and that is able to project changes in flood risk due to climate change and socio-economic developments, and costs of adaptation. For this research, we build upon the global flood hazard estimation method developed by Winsemius et al. (Hydrology and Earth System Sciences, 2013), that produces flood inundation maps at different return period, for present day (EU WATCH) and future climate (IPCC scenarios RCP4.5 and 8.5, for five climate models). These maps are used for the assessment of flood impacts. We developed and tested a model for assessing direct economic flood damages by using large scale land use maps. We characterise vulnerable land use functions, in particular residential, commercial, industrial, infrastructure and agriculture, using depth-damage relationships. Furthermore, we apply up to NUTS3 level information on Gross Domestic Product, which is used as a proxy for relative differences in maximum damage values between different areas. Next, we test two adaptation measures, by adjusting flood protection levels and adjusting damage functions. The results show the projected changes in flood risk in the future. For example, on NUTS2 level, flood risk increases in some regions up to 179% (between the baseline scenario 1960-1999 and time slice 2010-2049). On country level there are increases up to 60% for selected climate models. The conference presentation will show the most relevant improvements in damage modelling on the continental scale, and results of the analysis of adaptation measures. The results will be critically discussed under the aspect of major

  19. Project Evaluation: Validation of a Scale and Analysis of Its Predictive Capacity

    Science.gov (United States)

    Fernandes Malaquias, Rodrigo; de Oliveira Malaquias, Fernanda Francielle

    2014-01-01

    The objective of this study was to validate a scale for assessment of academic projects. As a complement, we examined its predictive ability by comparing the scores of advised/corrected projects based on the model and the final scores awarded to the work by an examining panel (approximately 10 months after the project design). Results of…

  20. Economic and Social Impact Analysis of Agroforestry Development Projects in Villarica Diadi and Norzagaray

    OpenAIRE

    delos Angeles, Marian S.

    1983-01-01

    To achieve the objectives of agroforestry development projects, this study has identified several conditions such as input provision to agriculture and forestry components, organization building, land tenure security, human resource development, technology extension, production and marketing. Hence, necessary to resource conservation projects is the acknowledgment of the intertwined relationships between the physical, economic and institutional considerations in project implementation.