WorldWideScience

Sample records for analysis implementation plan

  1. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U.S. Department of Energy, Richland Operations Office (DOE-E) for implementation by B and W Hanford Company (BWC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. A status is provided for each recommendation in this document. BWHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and IUD 5480.7

  2. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480.7A. Additionally, one observation was provided. To date, four of the recommendations and the one observation have been completed. Actions identified for seven of the recommendations are currently in progress. Exemption requests will be transmitted to DOE-RL for three of the recommendations. Six of the recommendations are related to future shut down activities of the facility and the corrective actions are not being addressed as part of this plan. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process. Major Life Safety Code concerns have been corrected. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. BVMC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  3. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FRA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (B and WHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. To date, actions for five of the 11 items have been completed. Exemption requests will be transmitted to DOE-RL for two of the items. Corrective actions have been identified for the remaining four items. The completed actions address combustible loading requirements associated with the operation of the cells and support areas. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. B and WHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  4. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  5. Liquid effluent Sampling and Analysis Plan (SAP) implementation summary report

    International Nuclear Information System (INIS)

    Lueck, K.J.

    1995-01-01

    This report summarizes liquid effluent analytical data collected during the Sampling and Analysis Plan (SAP) Implementation Program, evaluates whether or not the sampling performed meets the requirements of the individual SAPs, compares the results to the WAC 173-200 Ground Water Quality Standards. Presented in the report are results from liquid effluent samples collected (1992-1994) from 18 of the 22 streams identified in the Consent Order (No. DE 91NM-177) requiring SAPs

  6. Enterprise resource planning in a large construction firm: Implementation analysis

    NARCIS (Netherlands)

    Voordijk, Johannes T.; van Leuven, Arjen; Laan, Albertus

    2003-01-01

    In most large Dutch construction firms, Enterprise Resource Planning (ERP) systems have replaced nonintegrated information systems with integrated and maintainable software. The implementation of ERP systems in such firms is a difficult task. So far, ERP implementations have yielded more failures

  7. Problems in implementation of the spatial plan of the Republic of Srpska until 2015: Quantitative analysis

    Directory of Open Access Journals (Sweden)

    Bijelić Branislav

    2017-01-01

    Full Text Available The implementation of spatial plans in the Republic of Srpska is certainly the weakest phase of the process of spatial planning in this entity. It is particularly evident in the case of the Spatial Plan of the Republic of Srpska until 2015 which is the highest strategic spatial planning document in the Republic of Srpska. More precisely, the implementation of spatial plans has been defined as the carrying out of spatial planning documents, i.e. planning propositions as defined in the spatial plans. For the purpose of this paper, a quantitative analysis of the implementation of the planning propositions envisioned by this document has been carried out. The difference between what was planned and what was implemented at the end of the planning period (ex-post evaluation of planning decisions is presented in this paper. The weighting factor is defined for each thematic field and planning proposition, where the main criterion for determining the weighting factor is the share of the planning proposition and thematic field in the estimated total costs of the plan (financial criterion. The paper has also tackled the issue of the implementation of the Spatial Plan of Bosnia and Herzegovina for the period 1981 - 2000, as well as of the Spatial Plan of the Republic of Srpska 1996 - 2001 - Phased Plan for the period 1996 - 2001, as the previous strategic spatial planning documents of the highest rank covering the area of the Republic of Srpska. The research results have proven primary hypothesis of the paper that the level of the implementation of Spatial Plan of the Republic of Srpska until 2015 is less than 10%.

  8. Comparative analysis of elements and models of implementation in local-level spatial plans in Serbia

    Directory of Open Access Journals (Sweden)

    Stefanović Nebojša

    2017-01-01

    Full Text Available Implementation of local-level spatial plans is of paramount importance to the development of the local community. This paper aims to demonstrate the importance of and offer further directions for research into the implementation of spatial plans by presenting the results of a study on models of implementation. The paper describes the basic theoretical postulates of a model for implementing spatial plans. A comparative analysis of the application of elements and models of implementation of plans in practice was conducted based on the spatial plans for the local municipalities of Arilje, Lazarevac and Sremska Mitrovica. The analysis includes four models of implementation: the strategy and policy of spatial development; spatial protection; the implementation of planning solutions of a technical nature; and the implementation of rules of use, arrangement and construction of spaces. The main results of the analysis are presented and used to give recommendations for improving the elements and models of implementation. Final deliberations show that models of implementation are generally used in practice and combined in spatial plans. Based on the analysis of how models of implementation are applied in practice, a general conclusion concerning the complex character of the local level of planning is presented and elaborated. [Project of the Serbian Ministry of Education, Science and Technological Development, Grant no. TR 36035: Spatial, Environmental, Energy and Social Aspects of Developing Settlements and Climate Change - Mutual Impacts and Grant no. III 47014: The Role and Implementation of the National Spatial Plan and Regional Development Documents in Renewal of Strategic Research, Thinking and Governance in Serbia

  9. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  10. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  11. Strategic Analysis and Plan for Implementing Telemedicine at Fort Greely

    National Research Council Canada - National Science Library

    Bolton, Karl

    2003-01-01

    .... To best accomplish this, a strategic analysis and business case analysis was conducted. Introspective strategic analysis tools revealed an organization that is capable of supporting a telemedicine program at Fort Greely...

  12. Planning with Citizens: Implementation of an e-Planning Platform and Analysis of Research Needs

    Directory of Open Access Journals (Sweden)

    Stefan Steiniger

    2016-06-01

    Full Text Available Citizen participation should be an essential part of an urban planning process if the needs of the local population are to be addressed. Citizen participation should also improve acceptance of private construction projects by residents that live in or near such development. A complementary form of citizen participation to public planning meetings is to permit citizen engagement via Web 2.0 technologies, which also has the potential to get citizens involved that are usually difficult to reach. We aim to build a social, i.e. participatory, planning platform that allows technology savvy citizens to inform themselves of future and ongoing development projects and to also discuss them online. In this work we discuss the functional needs and context-of-use constraints of such an e-planning platform. A conceptual model of the technical architecture is outlined and a prototype implementation is presented. This prototype is built on free and open source software components, including a social network, to enable platform adoption in other locations. Finally, we discuss the research needs that are to be addressed if the development of participatory e-planning platforms should advance.

  13. Environmental protection Implementation Plan

    International Nuclear Information System (INIS)

    Holland, R. C.

    1999-01-01

    This ''Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ''Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities

  14. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    Science.gov (United States)

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  15. Environmental protection implementation plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable

  16. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  17. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  18. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  19. Risk Prevention Strategies and the SWOT Analysis for the Implementation of the SMEs’ Business Plan

    Directory of Open Access Journals (Sweden)

    Ionica Oncioiu

    2014-10-01

    Full Text Available This theme is targeting the importance of implementing the business plan of a small and medium company that has as aim the creation of the added value through research and innovation in the management of human resources performance based on information technology domain. The objective is to increase the economic competitiveness and development of knowledge-based economy whereas by the implementation of the project, it increases the company‟s profitability, creating a competitive advantage resulting in innovative products, as well as the effectiveness of companies that use human resources evaluation platform. The need identified on the market to which the SMEs wish to answer by implementing the plan is represented by the nationwide lack of a complex solution covering both the evaluation and the management of human resources performances. The used methodology can be found in the analysis, developing a strategy for preventing financial, human, market, marketing - image risks and also the physical ones. With the SWOT analysis it was observed one of the strengths i.e. the existence of a single management system of employee performance that includes assessment specific features. In conclusion, there are no software solutions at national level, which would assess the human resources of an organization, following specific indicators of that organization, which could combine the assessment methods in order to achieve more a more efficient and versatile assessment.

  20. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  1. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  2. Planning and Implementing Total Quality Management in the Royal Australian Air Force: A Multiple Case Study Analysis

    Science.gov (United States)

    1990-09-01

    Make final presentations of PDCA story Evaluate team methods Evaluate project results Recommend follow-up activity Celebrate PDCA cycle completion...Ohio .0 A, N~vdfrpheme^ 1 (0ub~ Uhdo AFIT/GLM/LSM/90S-40 PLANNING AND IMPLEMENTING TOTAL QUALITY MANAGEMENT IN THE ROYAL AUSTRALIAN AIR FORCE: A MULTIPLE...Special AFIT/GLM/LSM/90S-40 PLANNING AND IMPLEMENTING TOTAL QUALITY MANAGEMENT IN THE ROYAL AUSTRALIAN AIR FORCE: A MULTIPLE CASE STUDY ANALYSIS THESIS

  3. How to Disable Mortal Loops of Enterprise Resource Planning (ERP) Implementation: A System Dynamics Analysis

    OpenAIRE

    Kaveh M. Cyrus; Davide Aloini; Samira Karimzadeh

    2018-01-01

    Successful Enterprise Resource Planning (ERP) implementation depends upon various factors known as critical success factors (CSFs). This study developed a system dynamics model of ERP implementation based on CSFs to discuss ERP implementation complexities, which identifies the effect of CSF interrelations on different aspects of ERP project failure. Based on the model hypothesis, CSF interrelations include many causal loop dependencies. Some of these causal loops are called mortal loops, beca...

  4. Partnership capacity for community health improvement plan implementation: findings from a social network analysis.

    Science.gov (United States)

    McCullough, J Mac; Eisen-Cohen, Eileen; Salas, S Bianca

    2016-07-13

    Many health departments collaborate with community organizations on community health improvement processes. While a number of resources exist to plan and implement a community health improvement plan (CHIP), little empirical evidence exists on how to leverage and expand partnerships when implementing a CHIP. The purpose of this study was to identify characteristics of the network involved in implementing the CHIP in one large community. The aims of this analysis are to: 1) identify essential network partners (and thereby highlight potential network gaps), 2) gauge current levels of partner involvement, 3) understand and effectively leverage network resources, and 4) enable a data-driven approach for future collaborative network improvements. We collected primary data via survey from n = 41 organizations involved in the Health Improvement Partnership of Maricopa County (HIPMC), in Arizona. Using the previously validated Program to Analyze, Record, and Track Networks to Enhance Relationships (PARTNER) tool, organizations provided information on existing ties with other coalition members, including frequency and depth of partnership and eight categories of perceived value/trust of each current partner organization. The coalition's overall network had a density score of 30 %, degree centralization score of 73 %, and trust score of 81 %. Network maps are presented to identify existing relationships between HIPMC members according to partnership frequency and intensity, duration of involvement in the coalition, and self-reported contributions to the coalition. Overall, number of ties and other partnership measures were positively correlated with an organization's perceived value and trustworthiness as rated by other coalition members. Our study presents a novel use of social network analysis methods to evaluate the coalition of organizations involved in implementing a CHIP in an urban community. The large coalition had relatively low network density but high

  5. Partnership capacity for community health improvement plan implementation: findings from a social network analysis

    Directory of Open Access Journals (Sweden)

    J. Mac McCullough

    2016-07-01

    Full Text Available Abstract Background Many health departments collaborate with community organizations on community health improvement processes. While a number of resources exist to plan and implement a community health improvement plan (CHIP, little empirical evidence exists on how to leverage and expand partnerships when implementing a CHIP. The purpose of this study was to identify characteristics of the network involved in implementing the CHIP in one large community. The aims of this analysis are to: 1 identify essential network partners (and thereby highlight potential network gaps, 2 gauge current levels of partner involvement, 3 understand and effectively leverage network resources, and 4 enable a data-driven approach for future collaborative network improvements. Methods We collected primary data via survey from n = 41 organizations involved in the Health Improvement Partnership of Maricopa County (HIPMC, in Arizona. Using the previously validated Program to Analyze, Record, and Track Networks to Enhance Relationships (PARTNER tool, organizations provided information on existing ties with other coalition members, including frequency and depth of partnership and eight categories of perceived value/trust of each current partner organization. Results The coalition’s overall network had a density score of 30 %, degree centralization score of 73 %, and trust score of 81 %. Network maps are presented to identify existing relationships between HIPMC members according to partnership frequency and intensity, duration of involvement in the coalition, and self-reported contributions to the coalition. Overall, number of ties and other partnership measures were positively correlated with an organization’s perceived value and trustworthiness as rated by other coalition members. Conclusions Our study presents a novel use of social network analysis methods to evaluate the coalition of organizations involved in implementing a CHIP in an urban community. The

  6. How to Disable Mortal Loops of Enterprise Resource Planning (ERP Implementation: A System Dynamics Analysis

    Directory of Open Access Journals (Sweden)

    Kaveh M. Cyrus

    2018-01-01

    Full Text Available Successful Enterprise Resource Planning (ERP implementation depends upon various factors known as critical success factors (CSFs. This study developed a system dynamics model of ERP implementation based on CSFs to discuss ERP implementation complexities, which identifies the effect of CSF interrelations on different aspects of ERP project failure. Based on the model hypothesis, CSF interrelations include many causal loop dependencies. Some of these causal loops are called mortal loops, because they may cause the failure of risk reduction efforts to a more severe failure in effect of lack of system thinking on CSFs interrelations. This study discusses how system thinking works as a leverage point for overcoming ERP implementation challenges.

  7. Conduct of operations implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  8. Environmental implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  9. Environmental implementation plan

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1994-01-01

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities

  10. Improving Treatment Plan Implementation in Schools: A Meta-Analysis of Single Subject Design Studies

    Science.gov (United States)

    Noell, George H.; Gansle, Kristin A.; Mevers, Joanna Lomas; Knox, R. Maria; Mintz, Joslyn Cynkus; Dahir, Amanda

    2014-01-01

    Twenty-nine peer-reviewed journal articles that analyzed intervention implementation in schools using single-case experimental designs were meta-analyzed. These studies reported 171 separate data paths and provided 3,991 data points. The meta-analysis was accomplished by fitting data extracted from graphs in mixed linear growth models. This…

  11. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  12. Kaizen planning, implementing and controlling

    CERN Document Server

    García-Alcaraz, Jorge Luis; Maldonado-Macías, Aidé Aracely

    2017-01-01

    This book reports a literature review on kaizen, its industrial applications, critical success factors, benefits gained, journals that publish about it, main authors (research groups) and universities. Kaizen is treated in this book in three stages: planning, implementation and control. The authors provide a questionnaire designed with activities in every stage, highlighting the benefits gained in each stage. The study has been applied to more than 400 managers and leaders in continuous improvement in Mexican maquiladoras. A univariate analysis is provided to the activities in every stage. Moreover, structural equation models associating those activities with the benefits gained are presented for a statistical validation. Such a relationship between activities and benefits helps managers to identify the most important factor affecting their benefits and financial income.

  13. Development and Use of Life-Cycle Analysis Capabilities To Evaluate, Select, and Implement Plans to Accelerate Hanford Site Cleanup

    International Nuclear Information System (INIS)

    Shay, Michael R.; Johnson, Wayne L.; Frey, Jeffrey A.

    2004-01-01

    Over the past year the U.S. Department of Energy (DOE) has made significant progress in developing and executing plans to transform and accelerate cleanup of the Hanford Site. Notable progress has been in the cleanup of the River Corridor, including the relocation of spent nuclear fuel to the Central Plateau, and the stabilization of plutonium materials. However, difficult work still remains. DOE has already accelerated the completion of the Environmental Management (EM) cleanup mission from 2070 to 2035 and believes its completion can be achieved even sooner by reducing excess conservatism, substantively changing technical strategy and management approach, and making new front-end investments. Work is well under way in the detailed planning, analyses and decision making required to implement and support the execution of the accelerated cleanup program at Hanford. Various cleanup, contract, and regulatory approaches are being explored. DOE has instituted a process that allows DOE to efficiently explore and test alternative cleanup approaches using a life-cycle model. This paper provides a means to share the planning approach and the life-cycle modeling and analysis tools used with other sites and interested parties. This paper will be of particular interest to analysts performing similar planning and evaluations at other sites as well as provide insight into the current status of Hanford's cleanup program and DOE's plans for the future

  14. Evaluating the Implementation of School Wellness Plans

    Science.gov (United States)

    Tavenner, Patricia Lynn; Tomlinson, Jaret W.

    2011-01-01

    This problem-based learning project addressed the need to improve the implementation of school wellness plans in Missouri. Student health and well-being are at the forefront of educational issues throughout our country. The project performed a discrepancy analysis through three components. The components consisted of developing a knowledge base…

  15. Environmental Implementation Plan - EIP introduction

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Due to the commitment and participation of more than 100 professionals from site environmental coordinators, customer improvements and total quality are being incorporated into the Environmental Implementation Plan (EIP). The EIP is now a living document that communicates an overview of site environmental programs and the facility plans that are designed to protect the environment and meet changing regulatory requirements. Continuous improvement of environmental programs is enhanced through planned quarterly self-assessments during the open-quotes Reflectionsclose quotes process. Through the sharing of noteworthy practices, lessons learned, and ideas for improvement, the EIP provides a framework for environmental professionals to promote cost effective solutions and program improvements through teamwork and communication. These efforts were initiated by the Central Environmental Committee Executive Committee (CECEC) and developed and coordinated by the EIP subcommittee. The EIP revision process is the baseline for a continuous improvement cycle. Although the EIP is a Westinghouse Savannah River Company (WSRC) document, the environmental-planning process involves and will benefit all site contractors. Together, we are committed to a open-quotes Partnership in Environmental Excellence.close quotes

  16. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  17. Schedule optimization study implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

  18. Individualized Career Plan (ICP): Implementation Manual.

    Science.gov (United States)

    Batsche, Catherine; And Others

    This implementation manual was designed to assist local education agency personnel implement the individualized career plan (ICP) concept in high schools. Questions commonly asked about the ICP are answered. Guidelines are then provided for implementing the four stages of the process: planning, developing, implementing, and evaluating/refining.…

  19. Implementation planning for industrial energy conservation: approach and methodology

    Energy Technology Data Exchange (ETDEWEB)

    Alston, T.G.; Falk, G.; Grogan, P.J.; Katz, D.; Tatar, J.

    1981-01-01

    Details of an industry-specific Conservation Technology Implementation Branch implementation plan is described in detail. CTIB has conducted implementation planning in the steel, pulp/paper, and agriculture/food processing industries, but in FY 1981, CTIB plans to conduct planning for the chemicals, petroleum refining, aluminum, glass, cement, and textile industries. Guidelines are presented for each contractor for each industry toward a common methodology in terms of approach, areas of analysis, assumptions, and reporting. The major parts of the CTIB plan are: an implementation study consisting of technology selection, market demand analysis, and policy analysis, and a plan consisting of a detailed description and schedule of future CTIB actions, followed by a recommended system for monitoring market results when the plan is implemented. (MCW)

  20. Approved Air Quality Implementation Plans in Region 10

    Science.gov (United States)

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  1. Developing and Implementing a Marketing Plan.

    Science.gov (United States)

    McCalmon, Byron G.

    1987-01-01

    A program focusing on recruitment of new freshmen at the University of Colorado at Boulder illustrates some major planning considerations in the development, implementation, and evaluation of a marketing plan. (MSE)

  2. Experiment! planning, implementing and interpreting

    CERN Document Server

    Andersson, Oivind

    2012-01-01

    Experiments are the most effective way to learn about the world. By cleverly interfering with something to see how it reacts we are able to find out how it works. In contrast to passive observation, experimenting provides us with data relevant to our research and thus less time and effort is spent separating relevant from irrelevant information. The art of experimentation is often learnt by doing, so an intuitive understanding of the experimental method usually evolves gradually through years of trial and error. This book speeds up the journey for the reader to becoming a proficient experimenter. Organized in two parts, this unique text begins by providing a general introduction to the scientific approach to experimentation. It then describes the processes and tools required, including the relevant statistical and experimental methods. Towards the end of the book a methodology is presented, which leads the reader through the three phases of an experiment: 'Planning', 'Data Collection', and 'Analysis and S...

  3. Spatial planning, infrastructure and implementation: Implications for ...

    African Journals Online (AJOL)

    Spatial planning, infrastructure and implementation: Implications for planning school curricula. ... Town and Regional Planning ... A matrix of knowledge and skills is produced, and the way these fields of study have been taken up in the undergraduate/honours planning programme at the University of the Witwatersrand is ...

  4. Maintenance Implementation Plan for B Plant

    International Nuclear Information System (INIS)

    Tritt, S.E.

    1993-04-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ''Nuclear Facilities'' (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation

  5. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Science.gov (United States)

    2010-10-01

    ... regulations. 600.1008 Section 600.1008 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL... Capacity Reduction Framework § 600.1008 Implementation plan and implementation regulations. (a) As soon as..., accounting, record keeping, and/or reporting. (e) NMFS will issue final implementation regulations and adopt...

  6. Coral Reef Protection Implementation Plan

    National Research Council Canada - National Science Library

    Lobel, Lisa

    2000-01-01

    This document identify policies and actions to implement the Department of Defense's responsibilities under Executive Order 13089 on Coral Reef Protection, and are a requirement of the interim Task...

  7. Savannah River Site Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  8. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  9. Savannah River Site environmental implementation plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  10. Gen IV Materials Handbook Implementation Plan

    International Nuclear Information System (INIS)

    Rittenhouse, P.; Ren, W.

    2005-01-01

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  11. Gen IV Materials Handbook Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Rittenhouse, P.; Ren, W.

    2005-03-29

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  12. Planning, implementation and analysis of an assessment method of an industrial engineering course grounded on problem based learning

    Directory of Open Access Journals (Sweden)

    Camila Pereira Pinto

    2015-06-01

    Full Text Available In a highly competitive market, companies need increasingly skilled human resources, especially when it comes to engineering. Universities, therefore, play an important role in this scenario, while training future professionals of the country. However, in this task, the institutions are faced with the challenge of attracting and working with young people of Generation Y, which have characteristics and needs that are not met by traditional teaching methods. Problem-Based Learning (PBL is an approach evolved in order to study and develop educational alternatives that meet the needs of businesses as well as the new student profile. In addition, actively teaching is not a simple task and becomes more complex when it refers to assess the knowledge gained through this method. Thus, this paper presents the planning, implementation and the assessment method adopted in a course of Industrial Engineering at the Federal University of Itajubá based on PBL. For this study it was adopted the action research method, in which the authors actively participated in all stages of the course, acting as facilitators in the course planning, implementation and monitoring. As a result, it is highlighted in this article, the benefits achieved by all involved through active learning, as well as the strengths and weaknesses of the method. Moreover, improvements are proposed for future courses.

  13. Waste generator services implementation plan

    International Nuclear Information System (INIS)

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999

  14. Waste generator services implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999.

  15. Chesapeake Bay Watershed Implementation Plans (WIPs)

    Science.gov (United States)

    This page provides an overview of Watershed Implementation Plans (WIP) and how they play an important role in restoring the Chesapeake Bay. The page also provides links to each jurisdiction's Phase I, II, and III WIP.

  16. SSA FITARA Common Baseline Implementation Plan

    Data.gov (United States)

    Social Security Administration — This document describes the agency's plan to implement the Federal Information Technology Acquisition Reform Act (FITARA) Common Baseline per OMB memorandum M-15-14.

  17. Planning and implementation of nuclear research programmes

    International Nuclear Information System (INIS)

    Lopes, J.L.

    1986-01-01

    The planning and implementation of nuclear research programmes in developed and developing countries is discussed. The main aspects of these programmes in USA, France, Japan, India and Brazil are reported. (M.W.O.) [pt

  18. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 5: Nuclear electric propulsion vehicle

    Science.gov (United States)

    1991-01-01

    The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  19. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    Energy Technology Data Exchange (ETDEWEB)

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  20. Oracle accrual plans from requirements to implementation

    Energy Technology Data Exchange (ETDEWEB)

    Rivera, Christine K [Los Alamos National Laboratory

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  1. EVENT PLANNING USING FUNCTION ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    Lori Braase; Jodi Grgich

    2011-06-01

    Event planning is expensive and resource intensive. Function analysis provides a solid foundation for comprehensive event planning (e.g., workshops, conferences, symposiums, or meetings). It has been used at Idaho National Laboratory (INL) to successfully plan events and capture lessons learned, and played a significant role in the development and implementation of the “INL Guide for Hosting an Event.” Using a guide and a functional approach to planning utilizes resources more efficiently and reduces errors that could be distracting or detrimental to an event. This integrated approach to logistics and program planning – with the primary focus on the participant – gives us the edge.

  2. RCRA implementation plan, FY 1993. Directive (Final)

    International Nuclear Information System (INIS)

    1992-04-01

    The FY'93 RCRA Implementation Plan defines national priority activities for the RCRA Subtitle C hazardous waste program, the RCRA compliance monitoring and enforcement program, and the RCRA Subtitle D municipal and industrial solid waste program. The plan continues the strategic management framework begun by EPA and the states in FY'92. The report includes facility priority setting and evaluation, permitting, corrective action, states as primary implementors of the RCRA program, waste minimization, biennial reporting system, capacity assurance plans, comprehensive state ground-water planning, compliance monitoring and enforcement, accountability, and municipal and industrial solid waste management

  3. Maintenance implementation plan for fuel supply shutdown

    International Nuclear Information System (INIS)

    Stephenson, R.L.

    1995-06-01

    This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ''MAINTENANCE MANAGEMENT PROGRAM'', that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan

  4. Defense Special Case Transuranic Waste Implementation Plan

    International Nuclear Information System (INIS)

    Pierce, G.D.

    1987-06-01

    The purpose of the Special Case Implementation Plan (SCIP) is to establish a comprehensive plan for the efficient long-term management and disposal of defense special case (SC) transuranic (TRU) waste. To fulfill this purpose, a review of SC waste management strategies (at both the site-specific and TRU program levels), waste characteristics and inventories, processing and transportation options, and disposal requirements was made. This review provides a plan for implementing policy decisions and useful information for making those decisions. The SCIP is intended to provide a baseline plant to which alternate plans can be compared. General potential alternatives are provided for future consideration when data concerning facility availability and costs are better defined. Milestones for the SC Implementation Plan are included which summarize each SC waste site. The cost of implementing the SC program has an upper limit of $89 million for the worst case scenario. The actual cost of implementation could be dramatically lower than the worst case figure. 15 refs., 3 figs., 12 tabs

  5. Implementation of local climate action plans

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2017-01-01

    The purpose of this article is to improve understanding of local climate action plans and their implementation and evaluation. It explores how goal definition and the choice of assessment metrics frame goal attainment and influence implementation behaviour. Using the Danish capital of Copenhagen...... for an in-depth case study, we map activities undertaken and assess implementation performance in terms of infrastructure changes and GHG emission reductions during the period from adoption of the first climate action plan in 2002 to the present day (2017). The study shows that while Copenhagen exhibits...... to system developments that inhibit further changes beyond the initial target period. The article concludes with a list of lessons learned for other cities that are in earlier stages of climate planning. Most importantly, the study points to the need for activity-related evaluation metrics, scope...

  6. NERSC Strategic Implementation Plan 2002-2006

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  7. 76 FR 1578 - Approval and Promulgation of Implementation Plans; New Mexico; Federal Implementation Plan for...

    Science.gov (United States)

    2011-01-11

    ... College Boulevard, Computer Science Building, Room 7103, Farmington, New Mexico 87402, (505) 326-3311. The... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New Mexico; Federal... State Implementation Plan (SIP) revision submitted by the State of New Mexico and promulgate a Federal...

  8. Indonesia and the BRICS: Implementing the BEPS Action Plan

    Directory of Open Access Journals (Sweden)

    Andrey Shelepov

    2017-12-01

    Full Text Available Tax base erosion and profit shifting (BEPS is a global problem. Finding solutions is a challenge for most countries. The global economic crisis led to a new environment and requirements for doing business. These requirements have been developed by two key international institutions: the Organisation for Economic Cooperation and Development (OECD and the Group of 20 (G20. This approach has engaged the developed and developing countries that are members of these institutions, as well as a significant number of partner countries. As a result, more than 100 countries have confirmed their commitment to the BEPS Action Plan. This article assesses the level of implementation of the BEPS Plan in Indonesia and in the BRICS countries of Brazil, Russia, India, China and South Africa. The author monitored their activities for 13 of the 15 actions (excluding Actions 11 and 15 and identifies several best practices that can be used by Russia. Monitoring considered implemented and planned actions, primarily amendments to and new norms in relevant national legislation, as well as the expected implementation time for all BEPS actions. In addition, the author assessed institutional environments created to implement the provisions of the Action Plan, consultation processes and mechanisms for informing stakeholders. Analysis shows that approaches to implementing the BEPS Action Plan differ among the six countries. Although several lag behind in terms of their implementation schedule, each country has demonstrated some efforts that can be considered best practices. Russia has succeeded the most in implementing the Action Plan

  9. Adaptation: resources now to plan and implement

    Energy Technology Data Exchange (ETDEWEB)

    Huq, Saleemul

    2011-11-15

    Wealthy nations have committed to support developing countries to establish National Adaptation Plans (NAPs) that identify long-term priorities for responding to climate change challenges. But how and when will this support be given? Past experience suggests that national adaptation planning in expectation of future international funding is fraught with difficulties. Contributors to fast-start climate finance should release funds to developing countries straight away. These funds must be sufficient to plan longer-term adaptation strategies as well as implement immediate priorities. Equally importantly, recipients of these funds must decide for themselves how best to spend it.

  10. Challenges of Implementing Participatory Urban Planning In ...

    African Journals Online (AJOL)

    This study examined the challenges of implementing participatory urban planning in. Tanzania. The study was carried out in the city of Dar es Salaam, particularly in the. Kibamba and Chamazi wards from Kinondoni and Temeke municipal councils, respectively. The study employed a descriptive case study using both ...

  11. Enterprise Resource Planning Implementation in Higher Education

    Science.gov (United States)

    Graham, James F.

    2009-01-01

    Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…

  12. Marketing Internships: A Planning and Implementation Guide.

    Science.gov (United States)

    Faught, Suzanne G.

    This planning and implementation guide is designed to assist marketing educators and others supportive of marketing education. It begins with definitions of vocabulary of related terminology and descriptions of the four models of internships presented in the guide: full-year, rotation-type format; 1-semester, rotation-type format; full-year format…

  13. NASA Education Implementation Plan 2015-2017

    Science.gov (United States)

    National Aeronautics and Space Administration, 2015

    2015-01-01

    The NASA Education Implementation Plan (NEIP) provides an understanding of the role of NASA in advancing the nation's STEM education and workforce pipeline. The document outlines the roles and responsibilities that NASA Education has in approaching and achieving the agency's and administration's strategic goals in STEM Education. The specific…

  14. Hygienic-sanitary working practices and implementation of a Hazard Analysis and Critical Control Point (HACCP plan in lobster processing industries

    Directory of Open Access Journals (Sweden)

    Cristina Farias da Fonseca

    2013-03-01

    Full Text Available This study aimed to verify the hygienic-sanitary working practices and to create and implement a Hazard Analysis Critical Control Point (HACCP in two lobster processing industries in Pernambuco State, Brazil. The industries studied process frozen whole lobsters, frozen whole cooked lobsters, and frozen lobster tails for exportation. The application of the hygienic-sanitary checklist in the industries analyzed achieved conformity rates over 96% to the aspects evaluated. The use of the Hazard Analysis Critical Control Point (HACCP plan resulted in the detection of two critical control points (CCPs including the receiving and classification steps in the processing of frozen lobster and frozen lobster tails, and an additional critical control point (CCP was detected during the cooking step of processing of the whole frozen cooked lobster. The proper implementation of the Hazard Analysis Critical Control Point (HACCP plan in the lobster processing industries studied proved to be the safest and most cost-effective method to monitor each critical control point (CCP hazards.

  15. Planning, implementing, and monitoring multiple-species habitat conservation plans.

    Science.gov (United States)

    Franklin, Janet; Regan, Helen M; Hierl, Lauren A; Deutschman, Douglas H; Johnson, Brenda S; Winchell, Clark S

    2011-03-01

    Despite numerous recommendations for various aspects of the design and monitoring of habitat conservation plans, there remains a need to synthesize existing guidelines into a comprehensive scheme and apply it to real-world conservation programs. We review tools for systematic conservation planning and elements for designing and implementing ecological monitoring in an adaptive management context. We apply principles of monitoring design to the San Diego Multiple Species Conservation Program (MSCP) in California, USA--one of the first multispecies habitat conservation plans, located in a landscape where high biodiversity and urban development converge. Tools for spatial conservation planning are aimed to conserve biodiversity, often in the context of a limited budget. In practice, these methods may not accommodate legislative mandates, budgetary uncertainties, and the range of implementation mechanisms available across consortia of stakeholders. Once a reserve is implemented, the question becomes whether it is effective at conserving biodiversity, and if not, what actions are required to make it effective. In monitoring plan development, status and threats should be used to prioritize species and communities that require management action to ensure their persistence. Conceptual models documenting the state of knowledge of the system should highlight the main drivers affecting status and trends of species or communities. Monitoring strategies require scientifically justified decisions based on sampling, response, and data design. Because the framework illustrated here tackles multiple species, communities, and threats at the urban-wildland interface, it will have utility for ecosystem managers struggling to design monitoring programs.

  16. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  17. Implementing Strategic Environmental Assessment of spatial planning tools

    Energy Technology Data Exchange (ETDEWEB)

    De Montis, Andrea, E-mail: andreadm@uniss.it

    2013-07-15

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage.

  18. Implementing Strategic Environmental Assessment of spatial planning tools

    International Nuclear Information System (INIS)

    De Montis, Andrea

    2013-01-01

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage

  19. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  20. Pacific Northwest Laboratory Maintenance Implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  1. Pacific Northwest Laboratory Maintenance Implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  2. [Municipal health policy planning and implementation].

    Science.gov (United States)

    Vilasbôas, Ana Luiza Queiroz; Paim, Jairnilson Silva

    2008-06-01

    Municipal health policy planning can include exemplary practices for expanding the population's access to health services. The current study seeks to analyze the limits and possibilities of planning practices for policy implementation by a municipal health department. The empirical data were analyzed based on a concept of planning practices and the theoretical link between the three spheres of government and the postulate of coherence. The use of unstructured strategic planning practices by the management team allowed a significant expansion in the supply of services to the population, but lacked the scope to overcome the limits imposed on the organization's governability by the health services funding model, characterized by strong induction from the federal level. The project was the most robust vertex in the government triangle and led to the development of initial expertise by the municipal management team, thereby ensuring a certain level of governability over the health project. The goals of increasing the supply of health services were constrained by the method's weakness and the organization's institutional insipience.

  3. Statistical Analysis Plan

    DEFF Research Database (Denmark)

    Ris Hansen, Inge; Søgaard, Karen; Gram, Bibi

    2015-01-01

    This is the analysis plan for the multicentre randomised control study looking at the effect of training and exercises in chronic neck pain patients that is being conducted in Jutland and Funen, Denmark. This plan will be used as a work description for the analyses of the data collected....

  4. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  5. WHC natural phenomena hazards mitigation implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrads, T.J.

    1996-09-11

    Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

  6. 78 FR 17157 - Approval of Air Quality Implementation Plans; Indiana; Disapproval of State Implementation Plan...

    Science.gov (United States)

    2013-03-20

    ... implementation plan (SIP) for the ArcelorMittal Burns Harbor facility in Porter County, Indiana. This revision... would amend 326 Indiana Administrative Code (IAC) 7-4-14, Porter County SO 2 Emission Limitations, by... remove the SO 2 emission limit on the blast furnace gas flare at ArcelorMittal Burns Harbor in Porter...

  7. Implementation plan for smart meters in Ontario

    International Nuclear Information System (INIS)

    2004-01-01

    This paper presents Ontario Energy Board's implementation plan to install 800,000 smart meters by December 31, 2007. The objective is to help consumers control their electricity bills through conservation and demand response. The three conditions that will change power consumption habits are price changes in response to demand and supply forces; the ability of consumers to see and respond to the price signals; and, a measurement of the response so that consumers get credit for their actions. This paper identifies the mandatory technical requirements for smart meters and the support operations of distributors. It sets priorities, identifies barriers and regulatory mechanisms for cost recovery. It also discusses options for ownership of the meters. 18 refs., 1 tab., 2 figs

  8. Hanford Tanks Initiative quality assurance implementation plan

    International Nuclear Information System (INIS)

    Huston, J.J.

    1998-01-01

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy's Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing

  9. Environment, safety, and health regulatory implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-21

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project`s environment, safety, and health (ES&H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project`s regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES&H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status.

  10. Environment, safety, and health regulatory implementation plan

    International Nuclear Information System (INIS)

    1993-01-01

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project's environment, safety, and health (ES ampersand H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project's regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES ampersand H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status

  11. NYIT Energy Advisory Service implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Tenen, G.B.

    1976-08-26

    The philosophic basis and proposed implementation of an energy outreach program were set forth in a proposal of December 5, 1975 and in a revised proposal and budget of March 22, 1976, submitted after consultation with ERDA officials. The objectives and scope of work for the initial ten-month period presently contracted, and for the balance of the proposed two-year program, are summarized in the ERDA document ''Project: Outreach Program for Energy Information Dissemination in Adjacent Areas of New York, New Jersey, and Connecticut''. A copy is included at the end of this report. The implementation plan set forth here specifies the nature and the time schedule of the work to be accomplished throughout the tem-month and the two-year periods. In order to disseminate information to target audiences, the institute will utilize various energy technology channels of communications, including, the Energy Information Center; NYIT Energy Hot Line; Metropolitan Regional Council Television Seminars; Referral Services; press releases; technical assisance teams; newspaper question-and-answer columns; traveling displays; contests; conferences; radio spots; volunteers; and Center for Energy Policy and Research Periodical. All energy topics are included, but priority in the short term will be given to energy management programs for small commercial/industrial plants; residential building insulation and weatherization; solar hot water heating and solar space heating systems; and heat pumps. (MCW)

  12. 40 CFR 85.1804 - Approval of Plan: Implementation.

    Science.gov (United States)

    2010-07-01

    ... manufacturer shall commence implementation of the approved plan. Notification of vehicle or engine owners shall... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Approval of Plan: Implementation. 85... (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1804 Approval of Plan...

  13. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  14. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  15. Road weather information system statewide implementation plan.

    Science.gov (United States)

    2014-03-01

    The objective of this project was to develop a plan for deploying a statewide RWIS to support both current NYSDOT operations and future MDSS applications. To develop the plan, various information and data sources were investigated, including the curr...

  16. Recommendation 93-5 implementation plan, May 1996

    Energy Technology Data Exchange (ETDEWEB)

    Pennington, L.D., Westinghouse Hanford

    1996-05-01

    On July 19, 1993, the Defense Nuclear Facilities Safety Board transmitted Recommendation 93-5 on the Hanford Waste Tank Characterization Studies to the Department of Energy. The recommendation was accepted on September 9, 1993. Recommendation 93-5 noted that there was insufficient tank waste technical information to ensure that Hanford Site wastes could be safely stored, that associated operations could be conducted safely, and that future disposal data requirements could be met. As a result the Board recommended that the characterization effort be upgraded and expedited. The original Implementation Plan was accepted by the Board in March 1994. This Implementation Plan revision presents a modified approach to achieve the original Implementation Plan objectives. The approach concentrates on actions necessary to ensure that wastes can be safely stored, that operations can be safely conducted, and that timely characterization information for the tank waste Disposal Program can be obtained. Since Recommendation 93-5 was issued, significant progress has been achieved in understanding tank safety- related phenomena, resolving tank safety issues, and enhancing the capability and efficiency of tank characterization. Reviewing this progress led to the realization that tank safety issues could not be resolved solely by accelerating sampling and analysis to improve the characterization of tank contents. The key to expediting resolution was to better understand safety-related phenomena that cause the safety issues. A revised characterization and safety strategy evolved. The characterization and safety strategy presented in this Implementation Plan revision builds on the improved understanding and significant progress made to date. The revision is multifaceted and consists of the key elements listed: (1) Maintain tanks in an interim configuration using safety controls and, where necessary, mitigative actions. (2) Upgrade and complete the Authorization Basis for the Tank Farms

  17. Managing Plan Implementation in the Asante Akyem South District ...

    African Journals Online (AJOL)

    Managing Plan Implementation in the Asante Akyem South District Assembly: Capacity Issues and Challenges. ... This paper uses a case study approach to appraise the capacity of the Asante Akyem South District Assembly (AASDA) in managing the implementation of its development plans. Using questionnaires and ...

  18. Spatial planning, infrastructure and implementation: Implications for ...

    African Journals Online (AJOL)

    and their spatial implications, to socio-political, governance and institutional dimensions, such as the ..... is a mere 3% compliance level, with only. 32 out of ...... tools. 3 IDP. 4 IPP. 2 Land management. 3 Regional Planning –. Integrated planning. Spatial Frameworks. Land use systems, infrastructure management. Regional ...

  19. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    International Nuclear Information System (INIS)

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company's (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees

  20. Proposed Department of Defense software metrics implementation plan

    Science.gov (United States)

    Fife, Dennis W.; Popelas, Judy M.; Springsteen, Beth

    1994-09-01

    This report presents a proposed plan for DOD implementation of software metrics in support of acquisition reform and improved software risk management. The report documents the concluding phase of a one-year task to assess software metrics and to determine how to improve their use in software acquisition, particularly of weapon system software. An earlier effort surveyed the state of development and use of software metrics in industry and defense organizations. This survey found (1) that industry is strongly committed to using software metrics in a corporate-wide approach to gain marketplace advantages, and (2) that defense contractors exhibit a state of evolution in metrics use that is comparable to that of strictly commercial companies, if not more mature. The overall vision of the proposed plan is to establish a department-wide, bottom-to-top corporate approach for collecting and using software metrics to improve analysis and decision-making in software acquisition and risk management. Acquisition reform and the need for improved risk management should provide more specific goals to address under this vision, comparable to industry's goals of marketplace benefits from using software metrics. The plan is framed as eight specific recommendations, including a list of future research and development work that would support their implementation.

  1. CSSP implementation plan for space plasma physics programs

    International Nuclear Information System (INIS)

    Baker, D.N.; Williams, D.J.; Johns Hopkins Univ., Laurel, MD)

    1985-01-01

    The Committee on Solar and Space Physics (CSSP) has provided NASA with guidance in the areas of solar, heliospheric, magnetospheric, and upper atmospheric research. The budgetary sitation confronted by NASA has called for a prioritized plane for the implementation of solar and space plasma physics programs. CSSP has developed the following recommendations: (1) continue implementation of both the Upper Atmosphere Research Satellite and Solar Optical Telescope programs; (2) initiate the International Solar Terrestrial Physics program; (3) plan for later major free-flying missions and carry out the technology development they require; (4) launch an average of one solar and space physics Explorer per yr beginning in 1990; (5) enhance current Shuttle/Spacelab programs; (6) develop facility-class instrumentation; (7) augment the solar terrestrial theory program by FY 1990; (8) support a compute modeling program; (9) strengthen the research and analysis program; and (10) maintain a stable suborbital program for flexible science objectives in upper atmosphere and space plasma physics

  2. Researching on quantitative project management plan and implementation method

    Science.gov (United States)

    Wang, Xin; Ren, Aihua; Liu, Xiangshang

    2017-08-01

    With the practice of high maturity process improvement, more and more attention has been paid to CMMI and other process improvement frameworks. The key to improve the process of high maturity is to quantify the process. At present, the method of improving the software process of high maturity is lack of specific introduction to the corresponding improvement link or process implementation. In this paper, based on the current improvement in the quantitative management of the framework and statistical analysis technical of the high maturity recommended for the enterprise to improve the process of planning and implementation methods. These methods provide quantitative process management for the enterprise, as well as quantitative management of the project to provide a systematic process, and finally evaluate the effectiveness of quantitative management projects. Finally, this method is used to verify the effectiveness of the framework in guiding the enterprise to improve the process of high maturity.

  3. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  4. Are Urban Stream Restoration Plans Worth Implementing?

    Science.gov (United States)

    Sarvilinna, Auri; Lehtoranta, Virpi; Hjerppe, Turo

    2017-01-01

    To manage and conserve ecosystems in a more sustainable way, it is important to identify the importance of the ecosystem services they provide and understand the connection between natural and socio-economic systems. Historically, streams have been an underrated part of the urban environment. Many of them have been straightened and often channelized under pressure of urbanization. However, little knowledge exists concerning the economic value of stream restoration or the value of the improved ecosystem services. We used the contingent valuation method to assess the social acceptability of a policy-level water management plan in the city of Helsinki, Finland, and the values placed on improvements in a set of ecosystem services, accounting for preference uncertainty. According to our study, the action plan would provide high returns on restoration investments, since the benefit-cost ratio was 15-37. Moreover, seventy-two percent of the respondents willing to pay for stream restoration chose "I want to conserve streams as a part of urban nature for future generations" as the most motivating reason. Our study indicates that the water management plan for urban streams in Helsinki has strong public support. If better marketed to the population within the watershed, the future projects could be partly funded by the local residents, making the projects easier to accomplish. The results of this study can be used in planning, management and decision making related to small urban watercourses.

  5. Management Planning Requirements for Implementing Office Automation.

    Science.gov (United States)

    McDole, Thomas L.

    To be successful in implementing office automation, office managers must consider more than the obvious question of which system to purchase. They must consider whether automation of their particular office and operations will yield benefits of a significant magnitude to warrant the expense of money, time, and energy needed to install and operate…

  6. Professional analysis in spatial planning

    Directory of Open Access Journals (Sweden)

    Andrej Černe

    2005-12-01

    Full Text Available Spatial analysis contributes to accomplishment of the three basic aims of spatial planning: it is basic element for setting spatial policies, concepts and strategies, gives basic information to inhabitants, land owners, investors, planners and helps in performing spatial policies, strategies, plans, programmes and projects. Analysis in planning are generally devoted to: understand current circumstances and emerging conditions within planning decisions; determine priorities of open questions and their solutions; formulate general principles for further development.

  7. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  8. ARM Unmanned Aerial Systems Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schmid, Beat [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ivey, Mark [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-11-01

    Recent advances in Unmanned Aerial Systems (UAS) coupled with changes in the regulatory environment for operations of UAS in the National Airspace increase the potential value of UAS to the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility. UAS include unmanned aerial vehicles (UAV) and tethered balloon systems (TBS). The roles UAVs and TBSs could play within the ARM Facility, particularly science questions they could help address, have been discussed in several workshops, reports, and vision documents, including: This document describes the implementation of a robust and vigorous program for use of UAV and TBS for the science missions ARM supports.

  9. Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    International Nuclear Information System (INIS)

    Latham, A.R.; Evans, R.B.

    1991-11-01

    DOE Order 5400.1, ''General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs

  10. Implementing post-trial access plans for HIV prevention research.

    Science.gov (United States)

    Paul, Amy; Merritt, Maria W; Sugarman, Jeremy

    2018-02-27

    Ethics guidance increasingly recognises that researchers and sponsors have obligations to consider provisions for post-trial access (PTA) to interventions that are found to be beneficial in research. Yet, there is little information regarding whether and how such plans can actually be implemented. Understanding practical experiences of developing and implementing these plans is critical to both optimising their implementation and informing conceptual work related to PTA. This viewpoint is informed by experiences with developing and implementing PTA plans for six large-scale multicentre HIV prevention trials supported by the HIV Prevention Trials Network. These experiences suggest that planning and implementing PTA often involve challenges of planning under uncertainty and confronting practical barriers to accessing healthcare systems. Even in relatively favourable circumstances where a tested intervention medication is approved and available in the local healthcare system, system-level barriers can threaten the viability of PTA plans. The aggregate experience across these HIV prevention trials suggests that simply referring participants to local healthcare systems for PTA will not necessarily result in continued access to beneficial interventions for trial participants. Serious commitments to PTA will require additional efforts to learn from future approaches, measuring the success of PTA plans with dedicated follow-up and further developing normative guidance to help research stakeholders navigate the complex practical challenges of realising PTA. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  11. Pinellas Plant FY1990 site specific implementation plan

    International Nuclear Information System (INIS)

    Klein, R.D.

    1990-02-01

    This Site Specific Implementation Plan describes the Corrective Action, Environmental Restoration, and Waste Management activities to be performed at the Pinellas Plant in FY1990 (October 1, 1989 to September 30, 1989). These FY1990 activities are described in the Pinellas Plant FY1991--95 Five-Year Plan. The information used to prepare this plan reflects the best estimate of the project scope, schedules, regulatory, and funding requirements at the time of plan preparation. The Environmental Restoration/Waste Management Five-Year Plan is a dynamic document and will be modified each year; the Site Specific Implementation Plan will, in turn, be modified each year to reflect new findings, information, and knowledge of the various projects. 4 figs., 11 tabs

  12. Enterprise resource planning in construction: An evaluation of recent implementations

    NARCIS (Netherlands)

    Leuven, A.; Voordijk, Johannes T.; Akintoye, A

    2001-01-01

    In a large number of construction firms, Enterprise Resource Planning (ERP) systems have replaced non-integrated information systems by integrated and maintainable software. The implementation of ERP systems in the construction industry is a difficult task. So far, ERP implementations have yielded

  13. Environmental implementation plan: Chapter 7, Groundwater protection

    International Nuclear Information System (INIS)

    Wells, D.

    1994-01-01

    The Savannah River Site (SRS) uses large quantities of groundwater for drinking, processing, and non-contact cooling. Continued industrial and residential growth along with additional agricultural irrigation in areas adjacent to SRS will increase the demand for groundwater. This increasing demand will require a comprehensive management system to ensure the needed quality and quantity of groundwater is available for all users. The Groundwater Protection Program and the Waste Management Program establish the overall framework for protecting this resource. Ground water under SRS is monitored extensively for radiological, hazardous, and water quality constituents. Groundwater quality is known to have been affected at 33 onsite locations, but none of the contaminant plumes have migrated offsite. Onsite and offsite drinking water supplies are monitored to ensure they are not impacted. The site has more than 1800 monitoring wells from which groundwater samples are analyzed for radiological and non-radiological constituents. SRS is complying with all applicable regulations related to groundwater protection, waste treatment, and waste disposal. The existing waste storage facilities are permitted or are being permitted. Existing hazardous- and mixed-waste storage facilities are being included in the site Resource Conservation and Recovery Act (RCRA) Part B Permit. Part B permitting has been initiated for many of the planned hazardous- and mixed-waste treatment and disposal facilities

  14. 78 FR 67327 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Revised...

    Science.gov (United States)

    2013-11-12

    ... Guidance for Developing Transportation Conformity State Implementation Plans (SIPs) for further background... consulted our document ``Guidance for Developing Transportation Conformity State Implementation Plans (SIPs...] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Revised Transportation...

  15. Update of the Used Fuel Dispositon Campaign Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    McMahon, Kevin A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bragg-Sitton, Shannon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Mackinnon, Robert James [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Saltzstein, Sylvia J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorenson, Ken B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Swift, Peter N. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Birkholzer, Jens T. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-10-01

    This Update to the Used Fuel Disposition Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program, building on work completed in this area since 2009. This implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclearfuel- and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to available funding and progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  16. Update of the used fuel disposition Campaign Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Birkholzer, Jens [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); MacKinnon, Robert [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McMahon, Kevin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Saltzstein, Sylvia [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorenson, Ken [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Swift, Peter [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-09-01

    This Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program The implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclear-fuel-and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  17. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  18. Resource recovery planning: an overview of the implementation process. [Guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Resource recovery increasingly is becoming a major concern of city officials. Cities that undertake effective resource-recovery programs can benefit in two ways. First, the volume of solid waste can be significantly reduced, thus prolonging the life of existing landfill sites. Second, resource recovery can produce revenues that will offset, at least in part, refuse collection and disposal costs. However, no city should undertake resource-recovery activities with the expectation that a profit will be made. Third, there is an increasing appreciation of the fact that the nation's resources are finite. City officials may begin considering resource recovery in anticipation that the recycling of consumed materials may become national policy. Successful implementation and management of resource-recovery facilities is a difficult and complex venture for city officials. This report outlines the critical components of the implementation process. The guide covers the issues of mixed waste recovery: large-scale, capital-investment projects that require precision planning and analysis of the financial, technical, and administrative considerations.

  19. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Directory of Open Access Journals (Sweden)

    Jinghuan He

    2015-01-01

    Full Text Available Since the 1980s China has experienced unprecedented urbanisation as a result of a series of reforms promoting rapid economic development. Shanghai, like the other big cities along China’s coastline, has witnessed extraordinary growth in its economy and population with industrial development and rural-to-urban migration generating extensive urban expansion. Shanghai’s GDP growth rate has been over 10 per cent for more than 15 years. Its population in 2013 was estimated at 23.47 million, which is double its size in 1979. The urban area enlarged by four times from 644 to 2,860 km2 between 1977 and 2010. Such demanding growth and dramatic changes present big challenges for urban planning practice in Shanghai. Plans have not kept up with development and the mismatch between the proposals in plans and the actual spatial development has gradually increased, reaching a critical level since 2000. The mismatch in the periurban areas is more notable than that in the existing urban area, but there has not been a systematic review of the relationship between plan and implementation. Indeed, there are few studies on the evaluation of plan implementation in China generally. Although many plans at numerous spatial levels are successively prepared and revised, only few of them have been evaluated in terms of their effectiveness and implementation.  This particularly demanding context for planning where spatial development becomes increasingly unpredictable and more difficult to influence presents an opportunity to investigate the role of plans under conditions of rapid urbanisation. The research project asks to what extent have spatial plans influenced the actual spatial development in the peri-urban areas of Shanghai? The research pays particular attention to the role of the Shanghai Master Plan 1999-2020 (Plan 1999. By answering the main research question this study seeks to contribute to a better understanding of present planning practice in Shanghai

  20. High performance computing and communications: FY 1996 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  1. 77 FR 51619 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2012-08-24

    ... Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four... Available Retrofit Technology for Four Corners Power Plant: Navajo Nation AGENCY: Environmental Protection...-fired power plant located on the Navajo Nation near Farmington, New Mexico, to achieve emissions...

  2. 75 FR 69373 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2010-11-12

    ... Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power... Available Retrofit Technology (BART) provision. The proposal was published in the Federal Register on... open houses and public hearings will occur in Shiprock, New Mexico on December 7, 2010, Farmington, New...

  3. Systems engineering implementation plan for the liquid effluents services program

    International Nuclear Information System (INIS)

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described

  4. Maintenance implementation plan for T Plant. Revision 2

    International Nuclear Information System (INIS)

    Ayers, W.S.

    1995-05-01

    This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 open-quotes Nuclear Facilitiesclose quotes. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP

  5. Challenges experienced by nurses in the implementation of a healthcare reform plan in Iran.

    Science.gov (United States)

    Salarvand, Shahin; Azizimalekabadi, Maryam; Jebeli, Azadeh Akbari; Nazer, Mohamadreza

    2017-04-01

    The Healthcare Reform Plan is counted as a plan for improving healthcare services in Iran. Undoubtedly pros and cons can be seen either in plan or implementation. This study was conducted to describe nurses' challenges in implementing healthcare reform in Iran. A qualitative method centered upon conventional content analysis was applied. We used purposive sampling and data saturation was obtained by 30 participants. Data were analyzed using MAXQDA software. Challenges experienced by nurses in the implementation of this reform include; unsuitable infrastructure, unfavorable vision, a complicated challenge, the necessity of monitoring, control plan outcomes, the impact on nurses, people's misconceptions and solutions. The Healthcare Reform Plan in Iran is a solution to establish equality in the health system, however, to eliminate these challenges, revision and appropriate foundation of infrastructures is called for.

  6. Implementation plan for HANDI 2000 TWRS master equipment list

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products

  7. Current Strategic Business Plan for the Implementation of Digital Systems.

    Science.gov (United States)

    Library of Congress, Washington, DC. National Library Service for the Blind and Physically Handicapped.

    This document presents a current strategic business plan for the implementation of digital systems and services for the free national library program operated by the National Library Service for the Blind and Physically Handicapped, Library of Congress, its network of cooperating regional and local libraries, and the United States Postal Service.…

  8. Guide of Ideas for Planning and Implementing Intergenerational Projects

    Science.gov (United States)

    Pinto, Teresa Almeida; Marreel, Iris; Hatton-Yeo, Alan

    2009-01-01

    "Guide of Ideas for Planning and Implementing Intergenerational Projects," is for all professionals that are or wish to be enrolled in the development of intergenerational activities. This "Guide" is the main product of the Project MATES--Mainstreaming Intergenerational Solidarity, co-financed by the Lifelong Learning…

  9. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Science.gov (United States)

    2010-10-01

    ... strategy for full deployment of its PTC system, describing the criteria that it will apply in identifying... well as non-safety business benefits that may accrue. (2) In the Technology Implementation Plan of its... employ all of the functionalities required by this subpart. (c) FRA review. Within 90 days of receipt of...

  10. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Master Implementation Sequencing Plan. 385.30 Section 385.30 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY... from the adaptive management program, including new information on costs and benefits; or (vii...

  11. 2016-2020 Strategic Plan and Implementing Framework

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-11-01

    The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

  12. Implementation of enterprise resource planning systems: a user perspective

    Science.gov (United States)

    Reitsma, E.; Hilletofth, P.; Mukhtar, U.

    2018-04-01

    The purpose of this study is to evaluate critical success factors (CSFs) for the implementation of an enterprise resource planning (ERP) system from a user perspective. Users play a vital role when implementing an ERP system, but their perspective has been neglected in the literature. A better understanding of their perspective promises to contribute to the design of more effective ERP systems, its implementation, and management. In order to identify the user perspective, a survey was conducted within three Pakistani companies that recently have implemented a new ERP system. The questionnaire was developed based on thirteen CSFs deduced from literature. Based on each CSF’s level of importance, they are ranked in order of importance and divided into three groups: most important, important and not important. Findings reveal that users believe that management should prioritize the following four CSFs when implementing an ERP system: education and training, strategic decision-making, communication, and business process alignment.

  13. High performance computing and communications: FY 1995 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  14. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  15. MRP (materiel requirements planning) II implementation: a case study.

    Science.gov (United States)

    Sheldon, D

    1994-05-01

    Manufacturing resource planning (MRP II) is a powerful and effective business planning template on which to build a continuous improvement culture. MRP II, when successfully implemented, encourages a disciplined yet nonthreatening environment centered on measurement and accountability. From the education that accompanies an MRP II implementation, the employees can better understand the vision and mission of the organization. This common goal keeps everyone's energy directed toward the same final objective. The Raymond Corporation is a major materiels handling equipment manufacturer headquartered in Greene, New York, with class "A" MRP II manufacturing facilities in Greene and Brantford, Ontario and an aftermark distribution facility in East Syracuse, New York. Prior to the implementation of MRP II in its Greene plant (from 1988 through 1990) good intentions and hard work were proving to be less than necessary to compete in the global market. Certified class "A" in February 1990. The Raymond Corporation has built a world-class organization from these foundations.

  16. EG and G Idaho Environmental Protection Implementation Plan (1990)

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, L.E.

    1990-11-01

    This report describes the EG G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy--Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  17. EG and G Idaho Environmental Protection Implementation Plan (1991)

    International Nuclear Information System (INIS)

    Graham, J.F.

    1991-11-01

    This report describes the EG ampersand G Idaho, Inc. strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy -- Field Office Idaho (DOE-ID) Environmental Protection Implementation Plan by detailing EG ampersand G Idaho Environmental Protection Program activities. This report describes the current status of the EG ampersand G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG ampersand G Idaho organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab

  18. EG and G Idaho Environmental Protection Implementation Plan (1991)

    Energy Technology Data Exchange (ETDEWEB)

    Graham, J.F.

    1991-11-01

    This report describes the EG G Idaho, Inc. strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy -- Field Office Idaho (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G Idaho organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  19. EG and G Idaho environmental protection implementation plan

    International Nuclear Information System (INIS)

    Stump, R.C.

    1989-11-01

    This report describes the EG ampersand G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.0 Additionally, this report is intended to supplement the Department of Energy -- Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG ampersand G Idaho Environmental Protection Program activities. This report describes the current status of the EG ampersand G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG ampersand G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 3 figs., 1 tab

  20. 75 FR 70888 - Finding of Substantial Inadequacy of Implementation Plan; Call for Utah State Implementation Plan...

    Science.gov (United States)

    2010-11-19

    ..., he said he was aware that Colorado was in the process of revising its malfunction rule, that he would... the effort to adopt a new rule in Utah. Mr. Sprott also said that while he wanted to complete a rule... entitled ``Contingency Plan for FGD Systems During Downtime as a Function of PSD,'' from Edward E. Reich to...

  1. Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2014-12-01

    Full Text Available This paper proposes a planning support concept (PSC to implementation of sustainable parking development projects (SPDP in ancient Mediterranean cities. It is conceptualized by the logic of decision support systems and a multicriteria analysis approach. The purpose of the concept is to support setting of implementation priorities for subprojects (construction of new and/or improvement of existing parking within a SPDP. Analysing the existing and a planned state of parking within the city a goal tree is established. Subprojects are defined accordingly. Objectives from the last hierarchy level within the goal tree are used as criteria for assessment of defined subprojects. Representatives of stakeholders provided criteria weights by application of AHP and SAW methods. PROMETHEE II was used for priority ranking and PROMETHEE V ensured a definition of project’s implementation phases. The result of the presented concept is the implementation plan for such projects. The concept is tested on the city of Trogir.

  2. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  3. Standard Review Plan Update and Development Program. Implementing Procedures Document

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  4. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    Science.gov (United States)

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  5. Plan for implementing EPA standards for UMTRA sites

    International Nuclear Information System (INIS)

    1984-01-01

    This plan is designed to be a generic presentation on methodology that will be followed in implementing the EPA standards. Its applicability covers 24 inactive uranium mill tailings sites and approximately 8000 vicinity properties, no two of which are alike. This diversity dictates the more general approach of this plan. In practice, however, site-specific application will be implemented and will require extensive consultation with the appropriate state or tribe and the NRC. In addition, information concerning relevant Federal, state, or tribal standards and regulations will be considered along with any data that may assist in the evaluations. Throughout this process, DOE will encourage state and tribal participation to ensure that compliance with the EPA standards will be achieved

  6. EPOS Thematic Core Service Anthropogenic Hazards: Implementation Plan

    Science.gov (United States)

    Orlecka-Sikora, Beata; Lasocki, Stanislaw; Grasso, Jean Robert; Schmittbuhl, Jean; Styles, Peter; Kwiatek, Grzegorz; Sterzel, Mariusz; Garcia, Alexander

    2015-04-01

    EPOS Thematic Core Service ANTHROPOGENIC HAZARDS (TCS AH) aims to integrate distributed research infrastructures (RI) to facilitate and stimulate research on anthropogenic hazards (AH) especially those associated with the exploration and exploitation of geo-resources. The innovative element is the uniqueness of the integrated RI which comprises two main deliverables: (1) Exceptional datasets, called "episodes", which comprehensively describe a geophysical process; induced or triggered by human technological activity, posing hazard for populations, infrastructure and the environment, (2) Problem-oriented, bespoke services uniquely designed for the discrimination and analysis of correlations between technology, geophysical response and resulting hazard. These objectives will be achieved through the Science-Industry Synergy (SIS) built by EPOS WG10, ensuring bi-directional information exchange, including unique and previously unavailable data furnished by industrial partners. The Episodes and services to be integrated have been selected using strict criteria during the EPOS PP. The data are related to a wide spectrum of inducing technologies, with seismic/aseismic deformation and production history as a minimum data set requirement and the quality of software services is confirmed and referenced in literature. Implementation of TCS AH is planned for four years and requires five major activities: (1) Strategic Activities and Governance: will define and establish the governance structure to ensure the long-term sustainability of these research infrastructures for data provision through EPOS. (2) Coordination and Interaction with the Community: will establish robust communication channels within the whole TCS AH community while supporting global EPOS communication strategy. (3) Interoperability with EPOS Integrated Core Service (ICS) and Testing Activities: will coordinate and ensure interoperability between the RIs and the ICS. Within this modality a functional e

  7. A personalized care plan in chronic care: implementation and evaluation

    Science.gov (United States)

    Engels, Jeanny; Rebel, Marjolein; Boshuizen, Doortje

    2012-01-01

    Purpose Implementation and evaluation of a personalized care plan for approximately 350 people with (an increased risk of) cardiovascular disease in ten general practices in the Netherlands. Context The ‘Healthy Vessels’ (‘Vitale Vaten’) care standard of 2009 describes the optimum care for people with (an increased risk of) cardiovascular disease and is based on the Chronic Care Model. New: working with a personalized care plan, with detailed attention for the promotion of self-management and shared decision-making (SDM). This requires patients to adopt a more active attitude, with a more coaching role from care providers. Vilans has developed the personalized care plan for cardiovascular disease (the booklet ‘Zorgplan Vitale Vaten’) and the personalized care plan for diabetes and for COPD in 2011. In 2011 Vilans also started with the development of a general care plan for patients with multi morbidity diseases. Data sources Patients: quantitative survey with a written questionnaire sent to approximately 75 patients. Baseline and end points for 40 patients, plus in-depth interviews with eight patients. Care providers Quantitative survey with a written questionnaire sent to 45 care providers. Baseline and end points for 22 care providers, plus in-depth interviews with 10 care providers. Case description The personalized care plan is produced by a shared decision-making process and consists of: A prioritised list of the patient’s SMART objectives A personalized plan for achieving those objectives Agreements concerning what the patient will do himself/herself and the support or advice needed Agreements concerning contact to review the progress (how and when) The patient or the care provider notes the plan in the patient’s booklet (the ‘Zorgplan Vitale Vaten’=‘Healthy Vessels Care Plan’). This booklet also contains information about the risk factors for cardiovascular disease, the importance of the patient adopting an active role, measurement

  8. The emergency plan implementing procedures for HANARO facility

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jong Tai; Khang, Byung Oui; Lee, Goan Yup; Lee, Moon [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-04-01

    The radiological emergency plan implementing procedures of HANARO (High-flux Advanced Neutron Application Reactor) facility is prepared based on the Korea Atomic Law, the Civil Defence Law, Disaster Protection Law and the emergency related regulatory guides such as Guidance for Evolution of Radiation Emergency Plans in Nuclear Research Facilities (KAERI/TR-956/98, Feb.1998) and the emergency plan of HANARO. These procedures is also prepared to ensure adequate response activities to the rediological events which would cause a significant risk to the KAERI staffs and the public nea to the site. Periodic trainning and exercise for the reactor operators and emergency staffs will reduce accident risks and the release of radioactivities to the environment. 61 refs., 81 tabs. (Author)

  9. 76 FR 17801 - Approval and Promulgation of Implementation Plans; New York Reasonable Further Progress Plans...

    Science.gov (United States)

    2011-03-31

    ... inventory (controlled) VOC NOX VOC NOX Point 10.7 174.4 19.8 178.9 Area 445.4 77.6 413.6 84.4 Non-Road... daily point, area, non-road and on- road emissions are identified in the inventory. New York's 2008... Promulgation of Implementation Plans; New York Reasonable Further Progress Plans, Emissions Inventories...

  10. 75 FR 48864 - Approval and Promulgation of Air Quality Implementation Plans; MN

    Science.gov (United States)

    2010-08-12

    ... Hospital performed an air quality analysis to address the facility's impact on the SO 2 NAAQS. The facility... Promulgation of Air Quality Implementation Plans; MN AGENCY: Environmental Protection Agency (EPA). ACTION... (SIP) for sulfur dioxide (SO 2 ). The Minnesota Pollution Control Agency (MPCA) submitted the SIP...

  11. 77 FR 57863 - Approval and Promulgation of Implementation Plans; State of Montana; State Implementation Plan...

    Science.gov (United States)

    2012-09-18

    ... YELP mean or refer to Yellowstone Energy Limited Partnership. Table of Contents I. Background II. Basis..., in a presentation for the 2010 annual Community Modeling and Analysis System conference, Anderson et... (CMAS) 2010 Annual Conference, (October 11-15, 2010) can be found at http://www.cmascenter.org...

  12. Electronic Health Record Implementation: A SWOT Analysis

    Directory of Open Access Journals (Sweden)

    Leila Shahmoradi

    2017-12-01

    Full Text Available Electronic Health Record (EHR is one of the most important achievements of information technology in healthcare domain, and if deployed effectively, it can yield predominant results. The aim of this study was a SWOT (strengths, weaknesses, opportunities, and threats analysis in electronic health record implementation. This is a descriptive, analytical study conducted with the participation of a 90-member work force from Hospitals affiliated to Tehran University of Medical Sciences (TUMS. The data were collected by using a self-structured questionnaire and analyzed by SPSS software. Based on the results, the highest priority in strength analysis was related to timely and quick access to information. However, lack of hardware and infrastructures was the most important weakness. Having the potential to share information between different sectors and access to a variety of health statistics was the significant opportunity of EHR. Finally, the most substantial threats were the lack of strategic planning in the field of electronic health records together with physicians’ and other clinical staff’s resistance in the use of electronic health records. To facilitate successful adoption of electronic health record, some organizational, technical and resource elements contribute; moreover, the consideration of these factors is essential for HER implementation.

  13. Electronic Health Record Implementation: A SWOT Analysis.

    Science.gov (United States)

    Shahmoradi, Leila; Darrudi, Alireza; Arji, Goli; Farzaneh Nejad, Ahmadreza

    2017-10-01

    Electronic Health Record (EHR) is one of the most important achievements of information technology in healthcare domain, and if deployed effectively, it can yield predominant results. The aim of this study was a SWOT (strengths, weaknesses, opportunities, and threats) analysis in electronic health record implementation. This is a descriptive, analytical study conducted with the participation of a 90-member work force from Hospitals affiliated to Tehran University of Medical Sciences (TUMS). The data were collected by using a self-structured questionnaire and analyzed by SPSS software. Based on the results, the highest priority in strength analysis was related to timely and quick access to information. However, lack of hardware and infrastructures was the most important weakness. Having the potential to share information between different sectors and access to a variety of health statistics was the significant opportunity of EHR. Finally, the most substantial threats were the lack of strategic planning in the field of electronic health records together with physicians' and other clinical staff's resistance in the use of electronic health records. To facilitate successful adoption of electronic health record, some organizational, technical and resource elements contribute; moreover, the consideration of these factors is essential for HER implementation.

  14. COMPARATIVE ANALYSIS AND IMPLEMENTATION OF ...

    African Journals Online (AJOL)

    Main functionalities of the system will be implemented as a web-enabled geographic information system (GIS) application based on open-source technologies and object-oriented software development methodology using unified modeling language. Pilot implementation is done based on spatial data of three selected ...

  15. Looking to the future: Framing the implementation of interprofessional education and practice with scenario planning.

    Science.gov (United States)

    Forman, Dawn; Nicol, Pam; Nicol, Paul

    2015-01-01

    Adapting to interprofessional education and practice requires a change of perspective for many health professionals. We aimed to explore the potential of scenario planning to bridge the understanding gap and framing strategic planning for interprofessional education (IPE) and practice (IPP), as well as to implement innovative techniques and technology for large-group scenario planning. A full-day scenario planning workshop incorporating innovative methodology was designed and offered to participants. The 71 participants included academics from nine universities, as well as service providers, government, students and consumer organisations. The outcomes were evaluated by statistical and thematic analysis of a mixed method survey questionnaire. The scenario planning method resulted in a positive response as a means of collaboratively exploring current knowledge and broadening entrenched attitudes. It was perceived to be an effective instrument for framing strategy for the implementation of IPE/IPP, with 81 percent of respondents to a post-workshop survey indicating they would consider using scenario planning in their own organisations. The scenario planning method can be used by tertiary academic institutions as a strategy in developing, implementing and embedding IPE, and for the enculturation of IPP in practice settings.

  16. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  17. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  18. Human Factors Standards and implementation plan for waste management programs

    Energy Technology Data Exchange (ETDEWEB)

    Banks, W.W.

    1993-04-01

    The Department of Energy (DOE) is dedicated to assuring safety and public confidence by conducting a thorough assessment and upgrade of its nuclear policies and procedures. To ensure that DOE field operations protect the health and safety of employees, the general public and the environment, new operational procedures, standards, and implementation plans are both required and forthcoming from DOE Headquarters, NE-74. Part of this effort requires the establishment and integration of human factors engineering design standards and implementation methods to reduce the probability of human error, human injury and radiological exposure. Human Factors professionals work to assure that technology is designed and utilized safely and efficiently to serve the needs and capabilities of the people who must use this technology. The primary goal of human factors engineering is to ensure compatibility and congruence between the people, equipment, tasks, procedures and training so as to minimize human error and assure that ``total systems performance and reliability`` are achieved.

  19. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  20. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  1. Strategies and Exemplars for Public Outreach Events: Planning, Implementation, Evaluation

    Science.gov (United States)

    Cobb, W. H.; Buxner, S.; Shipp, S. S.; Shebby, S.

    2015-12-01

    IntroductionEach year the National Aeronautics and Space Administration (NASA) sponsors a variety of public outreach events to share information with educators, students, and the general public. These events are designed to increase interest in and awareness of the mission and goals of NASA. Planning and implementation best practices gleaned from the NASA SMD Education's review of large-scale events, "Best Practices in Outreach Events" will be shared. Outcomes from an event, i C Ceres, celebrating the Dawn mission's arrival at dwarf planet Ceres that utilized these strategies will be shared. Best practices included can be pertinent for all event organizers and evaluators regardless of event size. BackgroundThe literature review focused on identifying evaluations of large-scale public outreach events—and, within these evaluations, identifying best practices. The following criteria for identifying journal articles and reports to potentially include: Public, science-related events open to adults and children. Events with more than 1,000 attendees. Events that occurred during the last 5 years. Evaluations that included information on data collected from visitors and/or volunteers. Evaluations that specified the type of data collected, methodology, and associated results. Planning and Implementation Best PracticesThe literature review revealed key considerations for planning and of large-scale events implementing events. A summary of related best practices is presented below. 1) Advertise the event 2) Use and advertise access to scientists 3) Recruit scientists using these findings 4) Ensure that the event is group and particularly child friendly 5) Target specific event outcomes Best Practices Informing Real-world Planning, Implementation and EvaluationDawn mission's collaborative design of a series of events, i C Ceres, including in-person, interactive events geared to families and live presentations will be shared. Outcomes and lessons learned will be imparted

  2. Implementation of a National Trauma Research Action Plan (NTRAP).

    Science.gov (United States)

    Bulger, Eileen M; Rasmussen, Todd E; Jurkovich, Gregory J; Fabian, Timothy C; Kozar, Rosemary A; Coimbra, Raul; Costantini, Todd W; Ficke, James; Malhotra, Ajai K; Price, Michelle A; Smith, Sharon L; Cioffi, William G; Stewart, Ronald M

    2018-01-24

    Traumatic injury is a significant public health problem and the leading cause of death under age 44 in the United States. Federal investment in research funding is needed to address this issue and minimize death and disability. This report seeks to lay out a strategy for the development and implementation of a National Trauma Research Action Plan as described in the 2016 report by the National Academies of Sciences, Engineering, and Medicine (NASEM) entitled, Integrating Military and Civilian Trauma Systems to Achieve Zero Preventable Deaths after Injury.

  3. West Valley demonstration project: Implementation of the kerosene mitigation plan

    International Nuclear Information System (INIS)

    Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.

    1987-05-01

    An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab

  4. Implementation plan for the Operations Center Upgrade project

    International Nuclear Information System (INIS)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed

  5. Hanford Remedial Action Environmental Impact Statement, Richland, Washington. Implementation Plan

    International Nuclear Information System (INIS)

    1995-06-01

    This implementation plan was prepared in compliance in compliance with 10 CFR 1021. It includes the following sections: introduction; purpose and need for departmental action; scope, content, and alternatives for the HRA EIS; public participation process; schedule for preparation of the HRA EIS; anticipated environmental reviews and consultations; and contractor disclosure statement. The following appendices are also included: notice of intent, federal register notice for extension of public scoping period, proposed annotated outline for the draft HRA EIS, summary of final report for the Hanford Future Site Uses Working Group, and summary of comments and responses from the public scoping process

  6. Radiological planning and implementation for nuclear-facility decommissioning

    International Nuclear Information System (INIS)

    Valentine, A.M.

    1982-01-01

    The need and scope of radiological planning required to support nuclear facility decommissioning are issues addressed in this paper. The role of radiation protection engineering and monitoring professionals during project implementation and closeout is also addressed. Most of the discussion focuses on worker protection considerations; however, project support, environmental protection and site release certification considerations are also covered. One objective is to identify radiological safety issues that must be addressed. The importance of the issues will vary depending on the type of facility being decommissioned; however, by giving appropriate attention to these issues difficult decommissioning projects can be accomplished in a safer manner with workers and the public receiving minimal radiation exposures

  7. SRS ES and H Standards Compliance Program Implementation Plan

    International Nuclear Information System (INIS)

    Hearn, W.H.

    1993-01-01

    On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB's initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the U.S. Department of Energy (DOE), called for three actions: identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; assessment of the adequacy of those standards for protecting public health and safety; and determination of the extent to which they have and are being implemented. The purpose of this Implementation Plan is to define the single program for all sitewide and facility 90-2 ES and H Standards Compliance efforts, which will satisfy the HQ Implementation Plan, avoid duplicate efforts, be as simple and achievable as possible, include cost-saving innovations, use a graded approach based on facility hazards and future needs of facilities, and support configuration control for facility requirements. The Defense Waste Processing Facility (DWPF) has been designated a pilot facility for the 90-2 program and has progressed with their facility program ahead of the site-level program. The DWPF, and other Government-Owned Contractor-Operated (GOCO) facilities that progress on an enhanced schedule, will serve as pilot facilities for the site-level program. The lessons learned with their requirement identifications, and their assessments of the adequacy of and their compliance with these requirements will be used to improve the efficiency of the site-level and subsequent programs

  8. A strategic approach for Water Safety Plans implementation in Portugal.

    Science.gov (United States)

    Vieira, Jose M P

    2011-03-01

    Effective risk assessment and risk management approaches in public drinking water systems can benefit from a systematic process for hazards identification and effective management control based on the Water Safety Plan (WSP) concept. Good results from WSP development and implementation in a small number of Portuguese water utilities have shown that a more ambitious nationwide strategic approach to disseminate this methodology is needed. However, the establishment of strategic frameworks for systematic and organic scaling-up of WSP implementation at a national level requires major constraints to be overcome: lack of legislation and policies and the need for appropriate monitoring tools. This study presents a framework to inform future policy making by understanding the key constraints and needs related to institutional, organizational and research issues for WSP development and implementation in Portugal. This methodological contribution for WSP implementation can be replicated at a global scale. National health authorities and the Regulator may promote changes in legislation and policies. Independent global monitoring and benchmarking are adequate tools for measuring the progress over time and for comparing the performance of water utilities. Water utilities self-assessment must include performance improvement, operational monitoring and verification. Research and education and resources dissemination ensure knowledge acquisition and transfer.

  9. Tank Waste Remediation System Tank Waste Analysis Plan. FY 1995

    International Nuclear Information System (INIS)

    Haller, C.S.; Dove, T.H.

    1994-01-01

    This documents lays the groundwork for preparing the implementing the TWRS tank waste analysis planning and reporting for Fiscal Year 1995. This Tank Waste Characterization Plan meets the requirements specified in the Hanford Federal Facility Agreement and Consent Order, better known as the Tri-Party Agreement

  10. 77 FR 47535 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2012-08-09

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District... final action to approve revisions to the Sacramento Metropolitan Air Quality Management District portion of the California State Implementation Plan (SIP). This revision concerns the definition of volatile...

  11. 77 FR 47581 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2012-08-09

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District... approve revisions to the Sacramento Metropolitan Air Quality Management District (SMAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the definition of volatile organic...

  12. 76 FR 12945 - Instructions for Implementing Climate Change Adaptation Planning in Accordance With Executive...

    Science.gov (United States)

    2011-03-09

    .../administration/eop/ceq/initiatives/adaptation . DATES: The Instructions for Implementing Climate Change... Change Adaptation Planning are available at: http://www.whitehouse.gov/administration/eop/ceq/initiatives... COUNCIL ON ENVIRONMENTAL QUALITY Instructions for Implementing Climate Change Adaptation Planning...

  13. Planning and implementing school oral health programs: A scoping review

    Directory of Open Access Journals (Sweden)

    Kuldeep Singh Shekhawat

    2016-01-01

    Full Text Available Introduction: Most school oral health programs (SOHPs focus on either oral health education or preventive aspects of oral health. This scoping review emphasizes the significance of the knowledge application to design and implement SOHP which is more industrious and result oriented. Aim: To highlight, those school dental health programs which have approached the school oral health from all possible planes, i.e., education, prevention, treatment needs, and follow-up. Materials and Methods: Document 11 of WHO information series on school health for planning the intervention was utilized to obtain the initial benchmark for “best practices.” Electronic database MEDLINE, Cochrane central register of controlled trials, Cochrane Database of Systematic Reviews, Database of Abstracts of Reviews of Effects, and SCOPUS were searched. Our search strategy included a 3 staged extraction. The first based on the title, the second was based on abstracts and the third stage was based on the full text. Hand search of the key journals was also done. Results: A total of four studies were finally selected and studied to indicate the best practices of the programs. Conclusion: Public health dentistry should now focus on SOHP planning and implementation in terms of management. We need to expand our horizons beyond clinical outcome and short-term goals to accumulate knowledge.

  14. Implementation Plan for a Common Nordic Retail Market

    Energy Technology Data Exchange (ETDEWEB)

    2010-09-15

    For several years NordREG has been working to promote and facilitate a common Nordic end user market. Given the political support that was expressed at the meeting of the Nordic energy ministers in the autumn of 2009, the work has become even more concrete. With this implementation plan, NordREG outlines what should be done, by whom and when in order to create a common Nordic end user market over the coming years. As the plan shows the need for contributed efforts from all stakeholders will be vital in the coming years in order to make a reality of the plans of creating a common Nordic end user market. The transition from national retail markets to a single Nordic market will take a great deal of work from regulators, DSOs, suppliers and TSOs. The benefits that a single Nordic end user market will bring will however make it worthwhile. In the long run, the integrated Nordic end user market will be a more efficient solution than keeping the four national markets. This is also a step towards the integration of European markets. The process of creating a single Nordic market also brings a unique opportunity to find new efficient solutions on different issues. Hence, the goal is not only to integrate the Nordic end user markets, but rather to develop a more customer oriented market with a high degree of competition between the suppliers

  15. Implementation of enhanced dynamic wedges in pinnacle treatment planning system

    International Nuclear Information System (INIS)

    Alaei, Parham; Higgins, Patrick D.; Gerbi, Bruce J.

    2005-01-01

    Enhanced dynamic wedges (EDW) provide many advantages over traditional hard wedges for linear accelerator treatments. Along with these advantages comes the responsibility of ensuring that this complex technology delivers the correct dose to patients. This involves determining the enhanced dynamic wedge factors for various field sizes and depths for use in the hand calculation of monitor units (MUs). The accurate representation of dynamic wedges in the treatment planning computer must also be ensured. This is required so that the final isodose distributions are correct and the MUs calculated by the treatment planning computer match those determined by hand calculation. We have commissioned and implemented the use of EDW in the Pinnacle radiation therapy planning system. The modeled dose profiles agree with the measured ones with a maximum difference of 2%. The MUs generated by Pinnacle are also within 2% of those calculated independently. The process of data collection and verification, beam modeling, and a discussion of a potential pitfall encountered in this process are presented in this paper

  16. 76 FR 15 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2011-01-03

    ... Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking and Trading... revisions to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking and...

  17. The Effects of Organizational Characteristics on Enterprise Resource Planning Implementation Success and Perceived Organizational Performance

    Directory of Open Access Journals (Sweden)

    Yaşar AKÇA

    2014-06-01

    Full Text Available The aim of this study is to demonstrate the effects of organizational characteristics on Enterprise Resource Planning (ERP system implementation success and organizational performance. For this purpose, data obtained from 236 firms through surveys were analyzed using correlation, factor and regression analysis. The results were as follows; (1 While top management support had a statistically significant and positive effect on ERP implementation success, it had no significant effect on perceived organizational performance. (2 Organizational consensus had a statistically significant effect on neither ERP implementation success nor organizational performance. (3 The effect of training on ERP implementation success and organizational performance was positive. (4 Although information intensity didn’t have an effect on ERP implementation success, it had a statistically significant and positive effect on organizational performance

  18. Implementation of the robustness analysis methodology for decenal planning in the expansion of electric sector; Aplicacao da metodologia de analise de robustez ao planejamento decenal de expansao do setor eletrico

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Renata de Azevedo Moreira da

    2008-05-15

    The objective of this dissertation is to develop an application from one of the techniques of 'soft' operational research, the Robustness Analysis, to the problem of decision making under uncertainty, as part of the planning of the electricity expansion planning process in Brazil. Initially are shown desirable characteristics of a methodology that will complement the traditional methods used in determining the expansion of the sector. Departing from the Decenal Plan for Power Expansion (2007/2016), an analysis of the different trends that can occur during the planning process is presented, so as to facilitate the visualization of the consequences of uncertainties that may change the schedule of the planned expansion and also help the interaction between actors working in the expansion planning of electricity generation. (author)

  19. Waste sampling and characterization facility (WSCF) maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Heinemann, J.L.

    1997-08-13

    This Maintenance Implementation Plan (MIP) is written to satisfy the requirements of the US Department of Energy (DOE) Order 4330.4B, Maintenance Management Program that specifies the general policy and objectives for the establishment of the DOE controlled maintenance programs. These programs provide for the management and performance of cost effective maintenance and repair of the DOE property, which includes facilities. This document outlines maintenance activities associated with the facilities operated by Waste Management Hanford, Inc. (WMH). The objective of this MIP is to provide baseline information for the control and execution of WMH Facility Maintenance activities relative to the requirements of Order 4330.4B, assessment of the WMH maintenance programs, and actions necessary to maintain compliance with the Order. Section 2.0 summarizes the history, mission and description of the WMH facilities. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy for implementing the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, listing the objective of each element, a discussion of the WMH compliance methodology, and current implementation requirements with references to WMH and HNF policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 is a schedule for specific improvements in support of this MIP.

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  1. Candidate functions for advanced technology implementation in the Columbus mission planning environment

    Science.gov (United States)

    Loomis, Audrey; Kellner, Albrecht

    1988-01-01

    The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

  2. 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program

    International Nuclear Information System (INIS)

    Knepp, A. J.

    1999-01-01

    The 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program (Implementation Plan) addresses approximately 700 soil waste sites (and associated structures such as pipelines) resulting from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs,burial grounds) in the 200 Areas and assigned to the Environmental Restoration Program. The Implementation Plan outlines the framework for implementing assessment activities in the 200 Areas to ensure consistency in documentation, level of characterization, and decision making. The Implementation Plan also consolidates background information and other typical work plan materials, to serve as a single referenceable source for this type of information

  3. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  4. Y-12 Site environmental protection program implementation plan (EPPIP)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

  5. Y-12 Site environmental protection program implementation plan (EPPIP)

    International Nuclear Information System (INIS)

    1996-11-01

    The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually

  6. Nurse manager succession planning: a concept analysis.

    Science.gov (United States)

    Titzer, Jennifer L; Shirey, Maria R

    2013-01-01

    The current nursing leadership pipeline is inadequate and demands strategic succession planning methods. This article provides concept clarification regarding nurse manager succession planning. Attributes common to succession planning include organizational commitment and resource allocation, proactive and visionary leadership approach, and a mentoring and coaching environment. Strategic planning, current and future leadership analysis, high-potential identification, and leadership development are succession planning antecedents. Consequences of succession planning are improved leadership and organizational culture continuity, and increased leadership bench strength. Health care has failed to strategically plan for future leadership. Developing a strong nursing leadership pipeline requires deliberate and strategic succession planning. © 2013 Wiley Periodicals, Inc.

  7. Increasing In-Service Teacher Implementation of Classroom Management Practices through Consultation, Implementation Planning, and Participant Modeling

    Science.gov (United States)

    Hagermoser Sanetti, Lisa M.; Williamson, Kathleen M.; Long, Anna C. J.; Kratochwill, Thomas R.

    2018-01-01

    Numerous evidence-based classroom management strategies to prevent and respond to problem behavior have been identified, but research consistently indicates teachers rarely implement them with sufficient implementation fidelity. The purpose of this study was to evaluate the effectiveness of implementation planning, a strategy involving logistical…

  8. Nurse manager succession planning: A cost-benefit analysis.

    Science.gov (United States)

    Phillips, Tracy; Evans, Jennifer L; Tooley, Stephanie; Shirey, Maria R

    2018-03-01

    This commentary presents a cost-benefit analysis to advocate for the use of succession planning to mitigate the problems ensuing from nurse manager turnover. An estimated 75% of nurse managers will leave the workforce by 2020. Many benefits are associated with proactively identifying and developing internal candidates. Fewer than 7% of health care organisations have implemented formal leadership succession planning programmes. A cost-benefit analysis of a formal succession-planning programme from one hospital illustrates the benefits of the programme in their organisation and can be replicated easily. Assumptions of nursing manager succession planning cost-benefit analysis are identified and discussed. The succession planning exemplar demonstrates the integration of cost-benefit analysis principles. Comparing the costs of a formal nurse manager succession planning strategy with the status quo results in a positive cost-benefit ratio. The implementation of a formal nurse manager succession planning programme effectively reduces replacement costs and time to transition into the new role. This programme provides an internal pipeline of future leaders who will be more successful than external candidates. Using an actual cost-benefit analysis equips nurse managers with valuable evidence depicting succession planning as a viable business strategy. © 2017 John Wiley & Sons Ltd.

  9. Participatory System Dynamics Modeling: Increasing Stakeholder Engagement and Precision to Improve Implementation Planning in Systems.

    Science.gov (United States)

    Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E

    2016-11-01

    Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.

  10. 77 FR 24399 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year...

    Science.gov (United States)

    2012-04-24

    ... Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year Emissions Inventory AGENCY... approve the ozone 2002 base year emissions inventory, portion of the state implementation plan (SIP... technology (RACT), contingency measures, a 2002 base- year emissions inventory and other planning SIP...

  11. Integrating guideline development and implementation: analysis of guideline development manual instructions for generating implementation advice.

    Science.gov (United States)

    Gagliardi, Anna R; Brouwers, Melissa C

    2012-07-23

    Guidelines are important tools that inform healthcare delivery based on best available research evidence. Guideline use is in part based on quality of the guidelines, which includes advice for implementation and has been shown to vary. Others hypothesized this is due to limited instructions in guideline development manuals. The purpose of this study was to examine manual instructions for implementation advice. We used a directed and summative content analysis approach based on an established framework of guideline implementability. Six manuals identified by another research group were examined to enumerate implementability domains and elements. Manuals were similar in content but lacked sufficient detail in particular domains. Most frequently this was Accomodation, which includes information that would help guideline users anticipate and/or overcome organizational and system level barriers. In more than one manual, information was also lacking for Communicability, information that would educate patients or facilitate their involvement in shared decision making, and Applicability, or clinical parameters to help clinicians tailor recommendations for individual patients. Most manuals that direct guideline development lack complete information about incorporating implementation advice. These findings can be used by those who developed the manuals to consider expanding their content in these domains. It can also be used by guideline developers as they plan the content and implementation of their guidelines so that the two are integrated. New approaches for guideline development and implementation may need to be developed. Use of guidelines might be improved if they included implementation advice, but this must be evaluated through ongoing research.

  12. Plan for implementing EPA standards for UMTRA sites

    International Nuclear Information System (INIS)

    1984-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), authorizes the Department of Energy (DOE) to undertake remedial actions at 24 DOE designated processing sites. The term ''processing site,'' by statutory definition, means the inactive uranium mill or processing site and any other real property or improvement which is in the vicinity of the mill or processing site and is determined to be contaminated with residual radioactive materials derived from the mill or processing site. For purposes of this document, the inactive mill or processing site is referred to as the ''processing site'' and the other real property or improvement in the vicinity of such site is referred to as a 'vicinity property.'' The purpose of the remedial actions is to stabilize and control the uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner. Remedial actions undertaken by DOE are to be accomplished: With the full participation of the affected states and Indian tribes, in accordance with standards issued by the Environmental Protection Agency (EPA), and with the concurrence of the Nuclear Regulatory Commission (NRC). This plan is designed to be a generic presentation on methodology that will be followed in implementing the EPA standards. 5 refs., 1 tab

  13. Implementation plan for WRAP Module 1 operational readiness review

    International Nuclear Information System (INIS)

    Irons, L.G.

    1994-01-01

    The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR

  14. Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3

    International Nuclear Information System (INIS)

    Meldrom, C.A.

    1996-03-01

    This document outlines the Maintenance Implementation Plan (MIP) for the Plutonium Finishing Plant (PFP) located at the Hanford site at Richland, Washington. This MIP describes the PFP maintenance program relative to DOE order 4330.4B. The MIP defines the key actions needed to meet the guidelines of the Order to produce a cost-effective and efficient maintenance program. A previous report identified the presence of significant quantities of Pu-bearing materials within PFP that pose risks to workers. PFP's current mission is to develop, install and operate processes which will mitigate these risks. The PFP Maintenance strategy is to equip the facility with systems and equipment able to sustain scheduled PFP operations. The current operating run is scheduled to last seven years. Activities following the stabilization operation will involve an Environmental Impact Statement (EIS) to determine future plant activities. This strategy includes long-term maintenance of the facility for safe occupancy and material storage. The PFP maintenance staff used the graded approach to dictate the priorities of the improvement and upgrade actions identified in Chapter 2 of this document. The MIP documents PFP compliance to the DOE 4330.4B Order. Chapter 2 of the MIP follows the format of the Order in addressing the eighteen elements. As this revision is a total rewrite, no sidebars are included to highlight changes

  15. Systems Engineering Implementation Plan for Single-Shell Tanks (SST) Retrieval Projects

    International Nuclear Information System (INIS)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-01-01

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor

  16. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-30

    ...] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of...

  17. 75 FR 958 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; 2002 Base Year Emission...

    Science.gov (United States)

    2010-01-07

    ... control measures, projection year emission inventories, motor vehicle emissions budgets, and contingency... Promulgation of Air Quality Implementation Plans; Maryland; 2002 Base Year Emission Inventory, Reasonable Further Progress Plan, Contingency Measures, Reasonably Available Control Measures, and Transportation...

  18. An evaluation of Mexican transportation planning, finance, implementation, and construction processes.

    Science.gov (United States)

    2009-10-01

    This research examined the legal, financial, institutional and policy processes that Mexico uses to plan, finance, : construct, and implement its transportation network. It documents through twelve case studies the state of the : practice in planning...

  19. Implementation of Logic Flow in Planning and Production Control

    Directory of Open Access Journals (Sweden)

    Ulewicz Robert

    2016-03-01

    Full Text Available The article presents the results of analysis, the use of continuous flow of logic at the stage of production planning and control of the company producing furniture. The concept of continuous flow tends to regulate the flow of materials in a manner that provides the shortest flow path without unnecessary activities (Muda is a Japanese word meaning waste, a constant takt and defined throughput at constant resource requirements for the so-called transfer of material through the whole process. In the study Glenday’d sieve method was used to identify the correct area, which requires the value stream mapping, and areas called excessive complexity, which do not provide added value. The use of Glenday’s sieve method made it possible to identify areas in which it must be improve production capacity.

  20. 76 FR 18650 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Science.gov (United States)

    2011-04-05

    ... reasonable further progress (RFP) plan, contingency measures, and other planning State Implementation Plan... to attain the 1997 annual PM 2.5 NAAQS. DATES: Effective Date: This final rule is effective on May 5... Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental...

  1. Cost-effectiveness analysis of the national implementation of integrated community case management and community-based health planning and services in Ghana for the treatment of malaria, diarrhoea and pneumonia.

    Science.gov (United States)

    Escribano Ferrer, Blanca; Hansen, Kristian Schultz; Gyapong, Margaret; Bruce, Jane; Narh Bana, Solomon A; Narh, Clement T; Allotey, Naa-Korkor; Glover, Roland; Azantilow, Naa-Charity; Bart-Plange, Constance; Sagoe-Moses, Isabella; Webster, Jayne

    2017-07-05

    Ghana has developed two main community-based strategies that aim to increase access to quality treatment for malaria, diarrhoea and suspected pneumonia: the integrated community case management (iCCM) and the community-based health planning and services (CHPS). The aim of the study was to assess the cost-effectiveness of these strategies under programme conditions. A cost-effectiveness analysis was conducted. Appropriate diagnosis and treatment given was the effectiveness measure used. Appropriate diagnosis and treatment data was obtained from a household survey conducted 2 and 8 years after implementation of iCCM in the Volta and Northern Regions of Ghana, respectively. The study population was carers of children under-5 years who had fever, diarrhoea and/or cough in the last 2 weeks prior to the interview. Costs data was obtained mainly from the National Malaria Control Programme (NMCP), the Ministry of Health, CHPS compounds and from a household survey. Appropriate diagnosis and treatment of malaria, diarrhoea and suspected pneumonia was more cost-effective under the iCCM than under CHPS in the Volta Region, even after adjusting for different discount rates, facility costs and iCCM and CHPS utilization, but not when iCCM appropriate treatment was reduced by 50%. Due to low numbers of carers visiting a CBA in the Northern Region it was not possible to conduct a cost-effectiveness analysis in this region. However, the cost analysis showed that iCCM in the Northern Region had higher cost per malaria, diarrhoea and suspected pneumonia case diagnosed and treated when compared to the Volta Region and to the CHPS strategy in the Northern Region. Integrated community case management was more cost-effective than CHPS for the treatment of malaria, diarrhoea and suspected pneumonia when utilized by carers of children under-5 years in the Volta Region. A revision of the iCCM strategy in the Northern Region is needed to improve its cost-effectiveness. Long-term financing

  2. Planning and Analysis swimmers training in the basic stage

    OpenAIRE

    Willner, Jiří

    2013-01-01

    Title: Planning and Analysis swimmers training in the basic stage Objectives: The aim is to experimentally apply an annual training plan developed based on previous training to a selected swimmers in the basic stage in given conditions. Subject to monitoring and recording are general indicators of training, diagnostic techniques swimming styles and selected functional indicators. Through track record at selected competitions we have verified the effectiveness and validity of the implemented p...

  3. Energy Efficiency/Renewable Energy Programs in State Implementation Plans - Guidance Documents

    Science.gov (United States)

    final document that provides guidance to States and local areas on quantifying and including emission reductions from energy efficiency and renewable energy measures in State Implementation Plans (SIPS).

  4. Marketing: Realistic Tips for Planning and Implementation in Special Libraries.

    Science.gov (United States)

    Kassel, Amelia

    2002-01-01

    Discusses the need for special libraries to have a marketing plan in order to increase support and plan for the future. Topics include finding the time; budgets and marketing; promoting library services; the use of outside consultants; making market planning a continuous process; and marketing efforts at product shows. (LRW)

  5. The Global Geostationary Wildfire ABBA: Current Implementation and Future Plans

    Science.gov (United States)

    Prins, E.; Schmidt, C. C.; Hoffman, J.; Brunner, J.; Hyer, E. J.; Reid, J. S.

    2012-12-01

    The Wild Fire Automated Biomass Burning Algorithm (WF_ABBA), developed at the Cooperative Institute for Meteorological Satellite Studies (CIMSS), has a long legacy of operational near real-time wildfire detection and characterization in the Western Hemisphere. The first phase of the global geostationary WF_ABBA was made operational at NOAA NESDIS in 2009 and currently includes diurnal active fire monitoring from GOES-East, GOES-South America, GOES-West, Meteosat-9 and MTSAT-1R/-2. This allows for near global active fire monitoring with coverage of Europe, Africa, Southeast Asia and the Western Pacific utilizing distinct geostationary sensors and a consistent algorithm. Version 6.5.006 of the WF_ABBA was specifically designed to address the capabilities and limitations of diverse geostationary sensors and requests from the global fire monitoring and user community. This presentation will provide an overview of version 6.5.006 of the global WF_ABBA fire product including the new fire and opaque cloud mask and associated metadata. We will demonstrate the WF_ABBA showing examples from around the globe with a focus on the capabilities and plans for integrating new geostationary platforms with coverage of Eastern Europe and Asia (INSAT-3D, Korean COMS, Russian GOMS Elektro-L MSU-GS). We are also preparing for future fire monitoring in the Western Hemisphere, Europe, and Africa utilizing the next generation GOES-R Imager and Meteosat Third Generation Flexible Combined Imager (MTG - FCI). The goal is to create a globally consistent long-term fire product utilizing the capabilities of each of these unique operational systems and a common fire detection algorithm. On an international level, development of a global geostationary fire monitoring system is supported by the IGOS GOFC/GOLD Fire Implementation Team. This work also generally supports Committee on Earth Observation Satellites (CEOS) activities and the Group on Earth Observations (GEO).

  6. Efficacy of recent state implementation plans for 8-hour ozone.

    Science.gov (United States)

    Pegues, Andrew H; Cohan, Daniel S; Digar, Antara; Douglass, Catherine; Wilson, Robyn S

    2012-02-01

    The development of state implementation plans (SIPs) for attainment of criteria pollutant standards is an integral component of air quality management in the United States. However, the content and efficacy of SIPs have rarely been examined systematically. Here, 20 SIPs developed in response to the 1997 8-hr ozone standard are reviewed as case studies of attainment efforts at the state level. Comparison of observed and model predicted ozone concentrations shows the US Environmental Protection Agency (EPA) recommended modeled attainment test to be a somewhat conservative predictor of attainment. Among 12 SIPs for regions that sought attainment by 2009, the test correctly predicted attainment and nonattainment in four and five regions, respectively; in the other three regions, attainment was observed despite predictions of nonattainment. However weight-of-evidence determinations and deviations from the recommended modeled attainment test methodology led five of these SIPs to predict attainment that was not in fact observed by 2009; three of those regions achieved attainment in 2010. Ozone and NO2 concentrations declined across much of the United States during the period covered by the SIPs, with rates of improvement strongly correlated with the initial pollution levels and hence greatest in nonattainment regions. However at monitors with mid-range levels of ozone initially, rates of reduction were largely independent of the initial attainment status of the region. This is consistent with thefact that apart from California, the majority of ozone precursor reductions documented by SIPs resulted from federal measures rather than from state or local controls specific to the nonattainment regions.

  7. The Operation “Big Saturn”: Plan and Implementation Opportunities

    Directory of Open Access Journals (Sweden)

    Ochirov Utash Borisovich

    2015-11-01

    Full Text Available The article analyzes the plan of one of the most important operations of a radical turning point in the course of the Great Patriotic War. Initially, the plan, conceived as the development of Operation “Uranus” and resulted in the encirclement of the 6th Army headed by Field Marshall Paulus at Stalingrad, was called “Saturn”. However, after creating a shortened version of the name “Small Saturn”, it was called “Big Saturn”. The main purpose of “Saturn” was to conduct the strategic offensive with the help of four or five armies from middle Don and Chir towards Rostov-on-Don to withdraw the enemy Army Group “Don” and Army Group “A” from the Caucasus. The enemy army groups consisted of almost a third of the units of the Wehrmacht and its allies, who fought against the Soviet Union and their defeat or delay on the Taman Peninsula where there was no port capacity for rapid evacuation of such a large group of people, equipment and supplies, could significantly change the balance of forces on the Eastern front. Unfortunately, the Сhief of the General Staff of the Red Army Alexander Vasilevsky, who was initially in charge of the “Saturn” operation as the representative of Stavka (General Headquarters, was appointed by Stalin in late November as a coordinator of the Soviet troops, achieving the encirclement of the surrounded Paulus’s grouping. Vasilevsky, using his authority, managed to transfer a significant part of the strategic reserves from the middle Don direction firstly to the Stalingrad direction and then to the Kotelnikovsky direction against unlocking grouping of Manstein. The analysis of the forces of the Stalingrad Front, given in the article, shows that there were enough troops to repulse an attack. The transferred strategic reserves proved to be redundant, and their offensive on Rostov failed, while their usage according to the plan “Saturn” would have led to undeniable success. As a result, Manstein

  8. 400 area secondary cooling water sampling and analysis plan

    Energy Technology Data Exchange (ETDEWEB)

    Penn, L.L.

    1996-10-29

    This is a total rewrite of the Sampling and Analysis Plan in response to, and to ensure compliance with, the State Waste Discharge Permit ST 4501 issued on July 31, 1996. This revision describes changes in facility status and implements requirements of the permit.

  9. MRP (materiel requirements planning) II: successful implementation the hard way.

    Science.gov (United States)

    Grubbs, S C

    1994-05-01

    Many manufacturing companies embark on MRP II implementation projects as a method for improvement. In spite of an increasing body of knowledge regarding successful implementations, companies continue to attempt new approaches. This article reviews an actual implementation, featuring some of the mistakes made and the efforts required to still achieve "Class A" performance levels.

  10. Key factors in the successful implementation of enterprise resource planning system

    Directory of Open Access Journals (Sweden)

    Farajollah Rahnavard

    2014-04-01

    Full Text Available Enterprise Resource Planning Systems (ERP are considered as the newest and most effective tools of enterprise resource planning and include an interconnected information, management and engineering system that meets all the needs of an organization. ERP implementation is costly and time-consuming and makes fundamental change in the process, if not implemented correctly it will cause challenges in most parts of the organization and will certainly fail. Therefore, the identification of key success factors in implementing ERP helps organizations avoid the loss of the project. This research aims to identify key success factors for ERP by examining 185 managers, professionals, experts of the Information and Communication Technology Institute associated with the Ministry of Communications and Information Technology of Iran. A questionnaire was used to collect data. Findings from exploratory factor analysis indicate that five factors: 1 user friendliness, flexible and consistency 2 establishment of project management; 3 alignment with user needs; 4 Management of organizational changes, and 5 observing the principles of successful implementation of ERP affect the institute and the corresponding suggestions are proposed consistent with these findings.

  11. Used fuel disposition campaign international activities implementation plan.

    Energy Technology Data Exchange (ETDEWEB)

    Nutt, W. M. (Nuclear Engineering Division)

    2011-06-29

    expertise from those countries with more mature programs. The U.S. fuel cycle is a once through fuel cycle involving the direct disposal of UNF, as spent nuclear fuel, in a geologic repository (previously identified at Yucca Mountain, Nevada), following at most a few decades of storage (wet and dry). The geology at Yucca Mountain, unsaturated tuff, is unique among all countries investigating the disposal of UNF and HLW. The decision by the U.S. Department of Energy to no longer pursue the disposal of UNF at Yucca Mountain and possibly utilize very long term storage (approaching 100 years or more) while evaluating future fuel cycle alternatives for managing UNF, presents a different UNF and HLW management R&D portfolio that has been pursued in the U.S. In addition, the research and development activities managed by OCRWM have been transferred to DOE-NE. This requires a reconsideration of how the UFDC will engage in cooperative and collaborative activities with other countries. This report presents the UFDC implementation plan for international activities. The DOE Office of Civilian Radioactive Waste Management (OCRWM) has cooperated and collaborated with other countries in many different 'arenas' including the Nuclear Energy Agency (NEA) within the Organization for Economic Co-operation and Development (OECD), the International Atomic Energy Agency (IAEA), and through bilateral agreements with other countries. These international activities benefited OCRWM through the acquisition and exchange of information, database development, and peer reviews by experts from other countries. DOE-NE cooperates and collaborates with other countries in similar 'arenas' with similar objectives and realizing similar benefits. However the DOE-NE focus has not typically been in the area of UNF and HLW management. This report will first summarize these recent cooperative and collaborative activities. The manner that the UFDC will cooperate and collaborate in the future is

  12. Strategic planning and security analysis

    International Nuclear Information System (INIS)

    DePasquale, S.

    1991-01-01

    Nuclear security master planning is a deliberative process, founded on the premise that the broad scope of security must be analyzed before any meaningful determinations may be reached on an individual security aspect. This paper examines the analytical process required in developing a Security Master Plan. It defines a four stage process concluding with the selection of security measures encompassing physical security, policy and procedure considerations and guard force deployment. The final product orchestrates each security measure in a complementary and supportive configuration

  13. High performance computing and communications: FY 1997 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A provides a detailed look at HPCC Program activities within each agency.

  14. Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System ; Step 1: Review and Critique of Implementation Plans.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Bunn, Amoret

    2000-12-01

    The Draft Biological Opinion on Operation of the Federal Columbia River Power System calls for the development of 1- and 5-year implementation plans. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards (i.e., biological objectives) in a timely manner. To develop implementation plans the key tasks and sequences of steps must be determined. Those responsible for specific tasks must be identified and they must understand what they need to do. There must be assurances that the resources (human, physical, and fiscal) to complete the tasks are available. Motivation and incentive systems should be set up. Systems to coordinate efforts and guide activity must be devised and installed. An information management system must be designed to manage and analyze data and ensure that appropriate data are collected. This will aid managers in assessing whether individual activities or actions are tracking with stated goals and objectives. Training programs to improve managerial and worker capability in making and implementing plans should be designed. Managerial leadership to guide the efforts of all individuals in achieving the goals of the anadromous and resident fish recovery must be developed. It is the entire process of managing fish recovery in relationship to the Biological Opinion that will guide, coordinate, motivate, and control work and determine the effectiveness and efficiency of plan implementation.

  15. A Quadrant Analysis on the Effectiveness of Planning and Control in Urban Housing Development in Selangor

    Directory of Open Access Journals (Sweden)

    Hamizah Yakob

    2016-01-01

    Full Text Available The current planning mechanisms which are development plan and planning control were recognised as important tools in housing planning process. However, the weaknesses involved in the preparation of development plans and its implementation through development control may impose constraints on housing development. The objective of this paper is to evaluate whether the housing planning and control activities practiced require improvement in terms of the level of effectiveness of its implementation by the LPAs and PCs in Selangor using Quadrant Analysis. It was found that three activities; location, compliance and difficulties need high attention to achieve effective housing planning control.

  16. 75 FR 953 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; 2002 Base Year Emission...

    Science.gov (United States)

    2010-01-07

    .... The budgets are identical to the projected 2008 on-road mobile source emission inventories. Because... Promulgation of Air Quality Implementation Plans; Maryland; 2002 Base Year Emission Inventory, Reasonable... Maryland State Implementation Plan (SIP) to meet the 2002 base year emissions inventory, the reasonable...

  17. 75 FR 20922 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Transportation...

    Science.gov (United States)

    2010-04-22

    ... with the January 2009, ``Guidance for Developing Transportation Conformity State Implementation Plans... Promulgation of Air Quality Implementation Plans; New Mexico; Transportation Conformity Requirement for... Transportation Conformity? II. What Is the Background for This Action? III. What Did the State Submit and How Did...

  18. Qualitative evaluation of radiopharmaceuticals preparation and implementation of a quality improvement plan

    International Nuclear Information System (INIS)

    Malzac, D.; Gonzales, E.; Goutain-Majorel, C.; Pascal-Ortiz, D.

    2010-01-01

    Purpose: the aim of this study is to evaluate the quality of radiopharmaceuticals preparation. The results allowed the implementation of a quality improvement planning. Conclusions: the qualitative evaluation of the radiopharmaceuticals preparation and the implementation of a quality improvement planning allowed to improve the quality of this preparation, to optimize the methods of working and to reduce the technician irradiation. (N.C.)

  19. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  20. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2009-0573; FRL-9146-5] Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental... South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan...

  1. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... the California State Implementation Plan; South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the...

  2. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Science.gov (United States)

    2011-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9457-6] California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of Direct Final Rule... Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143...

  3. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-08-29

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... rule. SUMMARY: EPA is proposing approval of a permitting rule submitted for the South Coast Air Quality Management District (District) portion of the California State Implementation Plan (SIP). The State is...

  4. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  5. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9670-9] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  6. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0276; FRL-9139-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  7. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-22

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...

  8. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... the Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP) under the Clean Air Act. On April 8, 2009, and...

  9. 75 FR 42018 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Science.gov (United States)

    2010-07-20

    ... face fines and suits for not implementing air pollution prevention plans in 1997, even though they were... within the areas covered by the plan; include provisions for the implementation of part C, Prevention of... requirements result in lower VOC and NO X emissions from new cars and light duty trucks, including sport...

  10. 77 FR 58072 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Science.gov (United States)

    2012-09-19

    ... Standard On December 30, 2011, EPA determined that the South Coast extreme ozone nonattainment area had... Implementation Plan Revision; South Coast AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule..., EPA is proposing to find that the California State Implementation Plan (SIP) for the Los Angeles-South...

  11. 77 FR 3928 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Consumer and Commercial...

    Science.gov (United States)

    2012-01-26

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Virginia; Consumer...: EPA is approving a State Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia... industrial (AIM) coatings, adhesives and sealants, and asphalt paving operations within the Northern Virginia...

  12. 76 FR 69214 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Consumer and Commercial...

    Science.gov (United States)

    2011-11-08

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Virginia; Consumer...: EPA is proposing to approve a State Implementation Plan (SIP) revision submitted by the Commonwealth..., architectural and industrial (AIM) coatings, adhesives and sealants, and asphalt paving operations within the...

  13. 77 FR 15263 - Approval and Promulgation of Implementation Plans; New Jersey; Motor Vehicle Enhanced Inspection...

    Science.gov (United States)

    2012-03-15

    ..., Periodic Inspection Program for Diesel Emissions, and Self- Inspection of Certain Classes of Motor Vehicles... Promulgation of Implementation Plans; New Jersey; Motor Vehicle Enhanced Inspection and Maintenance Program... 12, 2010, to the New Jersey State Implementation Plan (SIP) pertaining to New Jersey's motor vehicle...

  14. 78 FR 19128 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Particulate Matter Standards

    Science.gov (United States)

    2013-03-29

    ... Promulgation of Air Quality Implementation Plans; Ohio; Particulate Matter Standards AGENCY: Environmental... conditional approval of specified provisions of the Ohio state implementation plan (SIP) to a full approval... emission limitation exemption for jet engine testing. Pursuant to a state commitment underlying a previous...

  15. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    Science.gov (United States)

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  16. 77 FR 64445 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC...

    Science.gov (United States)

    2012-10-22

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2012-0541; FRL 9733-5] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC Adjusted Standard AGENCY... Illinois State Implementation Plan (SIP) an adjusted standard for the Greif Packaging, LLC facility located...

  17. 77 FR 64422 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC...

    Science.gov (United States)

    2012-10-22

    ... Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC Adjusted Standard AGENCY... State Implementation Plan (SIP) an adjusted standard for the Greif Packaging, LLC facility located at 5... submitted an Adjusted Standard for the Greif Packaging, LLC facility located at 5 S 220 Frontenac Road in...

  18. 76 FR 28181 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Sunland Park Section...

    Science.gov (United States)

    2011-05-16

    ... and are adjacent to El Paso, Texas, and Ciudad Juarez, Mexico, or what is commonly referred to as the... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Sunland... revision to the New Mexico State Implementation Plan (SIP). The submitted revision consists of a...

  19. 75 FR 53613 - Notice of Data Availability Supporting Federal Implementation Plans To Reduce Interstate...

    Science.gov (United States)

    2010-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 51, 52, 72, 78, and 97 [EPA-HQ-OAR-2009-0491; FRL-9194-9] RIN 2060-AP50 Notice of Data Availability Supporting Federal Implementation Plans To Reduce... rulemaking may be found in a previously published notice: Federal Implementation Plans To Reduce Interstate...

  20. 75 FR 81484 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-12-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0012; FRL-9243-1] Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... State Implementation Plan (SIP) that create and amend the Emissions Banking and Trading of Allowances...

  1. 75 FR 69909 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-11-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0012; FRL-9226-3] Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... four revisions to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking...

  2. 77 FR 71145 - Approval and Promulgation of Implementation Plans; New Mexico; New Source Review (NSR...

    Science.gov (United States)

    2012-11-29

    .... EPA's policy is that all comments received will be included in the public docket without change and... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New Mexico; New Source Review...) State Implementation Plan (SIP) for New Mexico. Among the changes, EPA is proposing to approve are the...

  3. 77 FR 15052 - National Ocean Council-National Ocean Policy Draft Implementation Plan

    Science.gov (United States)

    2012-03-14

    ... QUALITY National Ocean Council--National Ocean Policy Draft Implementation Plan AGENCY: Council on... essential to public health and national security. Next, public comments on the draft Implementation Plan... Executive Order 13547 establishing a National Policy for the Stewardship of the Ocean, our Coasts, and the...

  4. 78 FR 28550 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter Counties...

    Science.gov (United States)

    2013-05-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2013-0021;EPA-R05-OAR-2013-0022; FRL-9812-3] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter... Porter State Implementation Plans (SIPs) for the 1997 8-hour ozone standard, and the 1997 annual fine...

  5. 77 FR 24440 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year...

    Science.gov (United States)

    2012-04-24

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2010-0021(b); FRL-9661-9] Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year Emissions Inventory AGENCY... 2002 base year emissions inventory portion of the state implementation plan (SIP) revision submitted by...

  6. 77 FR 42686 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; the 2002 Base Year...

    Science.gov (United States)

    2012-07-20

    ... Promulgation of Air Quality Implementation Plans; Maryland; the 2002 Base Year Inventory AGENCY: Environmental... matter (PM 2.5 ) 2002 base year emissions inventory portion of the Maryland State Implementation Plan... National Ambient Air Quality Standard (NAAQS) SIP. EPA is proposing to approve the 2002 base year PM 2.5...

  7. 77 FR 71111 - Approval and Promulgation of Air Quality Implementation Plans; State of Florida; Regional Haze...

    Science.gov (United States)

    2012-11-29

    ... the State of Florida on April 13, 2012, to the EPA for parallel processing. Florida submitted this... submitted by the State of Florida on April 13, 2012, to the EPA for parallel processing. Florida re... Promulgation of Air Quality Implementation Plans; State of Florida; Regional Haze State Implementation Plan...

  8. Principal component analysis implementation in Java

    Science.gov (United States)

    Wójtowicz, Sebastian; Belka, Radosław; Sławiński, Tomasz; Parian, Mahnaz

    2015-09-01

    In this paper we show how PCA (Principal Component Analysis) method can be implemented using Java programming language. We consider using PCA algorithm especially in analysed data obtained from Raman spectroscopy measurements, but other applications of developed software should also be possible. Our goal is to create a general purpose PCA application, ready to run on every platform which is supported by Java.

  9. Strategic Planning: Contextual Factors that Facilitated and/or Challenged the Implementation of Strategic Planning in Two Nonprofit Organizations

    Science.gov (United States)

    Masilamony, Davadhasan

    2010-01-01

    As the nonprofit sector continues to grow in size and importance in American society, successful organizations proactively initiate strategic planning so they can be more responsive to changing circumstances, underlying trends, and shifting demands. At times, however, organizations develop elaborate plans that are never implemented. Unfortunately,…

  10. ECOWindS Joint Action Plan - Guidelines for Implementation

    DEFF Research Database (Denmark)

    2015-01-01

    The Joint Action Plan (JAP) is a deliverable of the European Clusters for Offshore Wind Servicing (ECOWindS) project Work Package 4 (WP4) “Joint Action Plan”. It presents a plan of action or a roadmap for research, development, and innovation (RDI) for the Offshore Wind Service (OWS) industry...

  11. An Examination of Family Physicians Plan Implementation in Rural ...

    African Journals Online (AJOL)

    Background: Family physician plan (FPP) and referral system (RS) is one of the major plans in Iran's health system with the aim of increasing the accountability in the health market, enhancing the public's access to the health services, lowering the unnecessary costs and equitable distribution of health across the society.

  12. Planning new basic guideline to the radiological risk. Content, radiological criteria and implementation

    International Nuclear Information System (INIS)

    Calvin Cuartero, M.; Vega Riber, R. de la; Martin Calvarro, J. M.

    2011-01-01

    The most important aspects of the Basic Guideline focus on their area of planning, groups of potential radiological emergencies in the type of activity associated with the levels of response planning and responsible organizations, structure and functions for each level, radiological criteria, implementation and maintenance of the effectiveness of the level of response plans abroad.

  13. 76 FR 38023 - Approval and Promulgation of Implementation Plans and Designations of Areas for Air Quality...

    Science.gov (United States)

    2011-06-29

    ...) plan, contingency measures, and other planning State Implementation Plan (SIP) revisions related to... NAAQS. DATES: Effective Date: This final rule is effective on July 29, 2011. ADDRESSES: EPA has..., Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street...

  14. 75 FR 18061 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Control of Air Pollution...

    Science.gov (United States)

    2010-04-09

    ... Promulgation of Air Quality Implementation Plans; Texas; Control of Air Pollution From Motor Vehicles AGENCY... School Bus Program, amend the Texas Emissions Reduction Plan (TERP), and amend the Locally Enforced Motor... Process B. Texas Clean School Bus Program C. The Texas Emissions Reduction Plan (TERP) D. Locally Enforced...

  15. The feasibility of implementing an integrated management plan of the Okavango Delta, Botswana

    Science.gov (United States)

    Magole, L.

    Both the Okavango River Panhandle Management Plan (ORPMP) and the Okavango Delta Management Plan (ODMP) represent attempts at different times by different environmental resources management authorities to tackle issues of environmental degradation, growing pressure on land and water resources of the Okavango Delta as well as conflict over management and use of the resources. This paper reviews the two plans with a view to find out if the conceptual framework they follow would have a bearing on their implementabilty. It is concluded that both plans have implementation challenges. The ORPMP fails to be implemented for rather conventional reasons such as lack of stakeholder involvement. The ODMP on the other hand was developed following an integrated water resources planning concept. However, implementing of this plan in an integrated manner is problematic due to centralized and not integrated national planning, adoption of a sectoral approach by government agencies, and low capacity of the relevant local authorities for integrated management of resources.

  16. DEVELOPMENT AND IMPROVEMENT OF BUSINESS HIGHER EDUCATION THROUGH IMPLEMENTATION OF STUDENTS LEARNING OUTCOMES ASSESSMENT PLAN (SLOAP

    Directory of Open Access Journals (Sweden)

    Zoran Ivanovski

    2013-03-01

    Full Text Available This study presents new vision how to upgrade business higher education at the Faculty of Economics at University of Tourism and Management in Skopje (UTMS. This paper is result of analyses of best practices of leading higher education institutions as well authors experience in higher education and business education and practice. The UTMS is orientated to introduce best practices and objective standards in order to offer high-quality business education for its students. UTMS has mission for permanent implementation of quality improvement measures as a way to achieve high professional and academic standards and become part of prosperous and respective Universities. In order to achieve this goal, UTMS plan to use additional measures, outcomes assessment as a way to measure institutional effectiveness, as well as effective technique for identifying where changes and improvements are necessary. UTMS has developed Students Learning Outcomes Assessment Plan (SLOAP as a way to reach this goal.Based on permanent analysis of students needs as well as business sector suggestions about desirable level of knowledge, skills and competence of the students from Faculty of Economics, gained from conducted evaluations, UTMS decide to make additional improvement and development of business education. This process have 4 phases: 1 evaluation of students attitude towards curricula and the instructors efficiency, 2preparation of the SLOAP (Student Learning Outcomes Assessment Plan document, 3 implementation of two direct measures from the SLOAP through assessment analysis and action planning, and 4 monitoring changes and improvements made as a result of action planning.The first phase was completed in spring semester 2012, as well as second one with development of Comprehensive Exam and Capstone Course as direct measures. Complete SLOAP also has indirect measures like student satisfaction inventory, course evaluations, alumni, and employers’ surveys, and a

  17. The practical implementation of enterprise balanced scorecard analysis system

    Directory of Open Access Journals (Sweden)

    Pollack G.A.

    2017-01-01

    Full Text Available The use of balanced scorecard system requires to use some measurable key performance indicators in every part of an enterprise activity, not only for the enterprise itself and its subdivisions, but for every employee. These actions need the introduction/application of a corporate information system. In this work we suggest the most commonly used Russian software “1C: Enterprise Platform” (Accounting system of enterprise. We present the practical implementation of the system of real-time monitoring, analysis and control for the implementation of actions concerned with financial component of the enterprise-balanced scorecard. The formed module (expansion can be applied in pattern “1C: ERP” (Enterprise Recourse Planning. The conclusion is made about the possibility of the above information system expansion for the implementation of all components of the enterprise balanced scorecard system.

  18. Integrating guideline development and implementation: analysis of guideline development manual instructions for generating implementation advice

    Science.gov (United States)

    2012-01-01

    Background Guidelines are important tools that inform healthcare delivery based on best available research evidence. Guideline use is in part based on quality of the guidelines, which includes advice for implementation and has been shown to vary. Others hypothesized this is due to limited instructions in guideline development manuals. The purpose of this study was to examine manual instructions for implementation advice. Methods We used a directed and summative content analysis approach based on an established framework of guideline implementability. Six manuals identified by another research group were examined to enumerate implementability domains and elements. Results Manuals were similar in content but lacked sufficient detail in particular domains. Most frequently this was Accomodation, which includes information that would help guideline users anticipate and/or overcome organizational and system level barriers. In more than one manual, information was also lacking for Communicability, information that would educate patients or facilitate their involvement in shared decision making, and Applicability, or clinical parameters to help clinicians tailor recommendations for individual patients. Discussion Most manuals that direct guideline development lack complete information about incorporating implementation advice. These findings can be used by those who developed the manuals to consider expanding their content in these domains. It can also be used by guideline developers as they plan the content and implementation of their guidelines so that the two are integrated. New approaches for guideline development and implementation may need to be developed. Use of guidelines might be improved if they included implementation advice, but this must be evaluated through ongoing research. PMID:22824094

  19. Developing a Robust Strategy for Implementing a Water Resources Master Plan in Lima, Peru

    Science.gov (United States)

    Kalra, N.; Groves, D.; Bonzanigo, L.; Molina-Perez, E.

    2015-12-01

    Lima, the capital of Peru, faces significant water stress. It is the fifth largest metropolitan area in Latin America, and the second largest desert city in the world. The city has developed a Master Plan of major investment projects to improve water reliability until 2040. Yet key questions remain. Is the Master Plan sufficient for ensuring reliability in the face of deeply uncertain future climate change and demand? How do uncertain budget and project feasibility conditions shape Lima's options? How should the investments in the plan be prioritized, and can some be delayed? Lima is not alone in facing these planning challenges. Governments invest billions of dollars annually in long-term projects. Yet deep uncertainties pose formidable challenges to making near-term decisions that make long-term sense. The World Bank has spearheaded a community of practice on methods for Decision Making Under Deep Uncertainty (DMU). This pilot project in Peru is the first in-depth application of DMU techniques to water supply planning in a developing country. It builds on prior analysis done in New York, California, and for the Colorado River, yet shows how these methods can be applied in regions which do not have as advanced data or tools available. The project combines three methods in particular -- Robust Decision Making, Decision Scaling, and Adaptive Pathways -- to help Lima implement its Master Plan in a way that is robust, no-regret, and adaptive. It was done in close partnership with SEDAPAL, the water utility company in Lima, and in coordination with other national WRM and meteorological agencies. This talk will: Present the planning challenges Lima and other cities face, including climate change Describe DMU methodologies and how they were applied in collaboration with SEDAPAL Summarize recommendations for achieving long-term water reliability in Lima Suggest how these methodologies can benefit other investment projects in developing countries.

  20. The essential ingredients of successful strategic planning and its implementation

    OpenAIRE

    DeRoth, Laszlo

    1990-01-01

    The strategic planning process initiated by the Pew Foundation through the Pritchard Report became a major preoccupation of all of the 31 faculties of veterinary medicine in the United States and Canada. It is proposed that, in order to be successful in the strategic planning process, three determinants related to perception, to personality, and to psychosocial behavior are necessary ingredients. First, the professional program should evolve in a team-spirited milieu which can inspire future ...

  1. Scenario Planning Implementation : A Case of a Malaysian Organisation

    OpenAIRE

    Lim, Lee Chin

    2007-01-01

    In this dynamic and ever changing era, uncertainties are inevitable. A successful organisation is one that is able to address the uncertainties in a world that is complex and unpredictable. Scenario planning is a strategic management tool that offers an alternative approach to planning in a world where linear logic does not prevail (Geons, 2001). It is a method for learning about the future by understanding the uncertainties and driving forces affecting an organisation’s future. Its core bene...

  2. Industrial Implementation of Models for Joint Production and Maintenance Planning

    OpenAIRE

    Macchi, Marco; Pozzetti, Alessandro; Fumagalli, Luca

    2014-01-01

    Part 2: Knowledge Discovery and Sharing; International audience; The paper aims at investigating the industrial applicability of models for joint production and maintenance planning. Scientific community has paid attention to this issue for decades and more recently many researchers proposed models to optimize such kind of planning. Nevertheless each scientific work is based on its peculiarities and hypothesis, which might prevent the applicability within different industrial contexts. This i...

  3. An appraisal of adaptive management planning and implementation in ecological restoration

    DEFF Research Database (Denmark)

    Nagarkar, Mita; Raulund-Rasmussen, Karsten

    2016-01-01

    Adaptive management has been defined and redefined in the context of natural resource management, yet there are few examples of its successful application in ecological restoration. Although the 2009 Delta Reform Act now legally requires adaptive management for all restoration efforts in the Sacr......Adaptive management has been defined and redefined in the context of natural resource management, yet there are few examples of its successful application in ecological restoration. Although the 2009 Delta Reform Act now legally requires adaptive management for all restoration efforts...... in the Sacramento-San Joaquin Delta, in California, USA, projects in this region still encounter problems with implementation. We used a comparative case study analysis to examine adaptive management planning and implementation both in and around the Delta, assessing not only why adaptive management is not yet well...... implemented, but also what changes can be made to facilitate the adaptive management approach without sacrificing scientific rigor. Adaptive management seems to be directly and indirectly affected by a variety of challenges and convoluted by ambiguity in both planning documents and practitioner...

  4. UMTRA water sampling and analysis plan, Lakeview, Oregon

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of this document is to provide background, guidance, and justification for water sampling activities for the Lakeview, Oregon, Uranium Mill Tailings Remedial Action (UMTRA) processing and disposal sites. This water sampling and analysis plan will form the basis for groundwater sampling and analysis work orders (WSAWO) to be implemented during 1993. Monitoring at the former Lakeview processing site is for characterization purposes and in preparation for the risk assessment, scheduled for the fall of 1993. Compliance monitoring was conducted at the disposal site. Details of the sampling plan are discussed in Section 5.0

  5. Evaluation of complete streets policy implementation by metropolitan planning organizations.

    Science.gov (United States)

    2015-09-01

    Over the last ten years, communities around the country have begun to implement comprehensive reforms : designed to ensure that roadway users of all ages and abilities can safely utilize the transportation system. : This complete streets policy frame...

  6. Planning and Analysis Needs for Pupil Transportation.

    Science.gov (United States)

    Stanley Associates, Edmonton (Alberta).

    This study was initiated to determine the pupil transportation planning and analysis needs of Alberta school systems and, based on these needs, to define an action plan for the development of an information or analytical package that would assist school boards with their pupil transportation activities. Based on the data collected from indepth…

  7. Implementation of the Every Newborn Action Plan: Progress and lessons learned.

    Science.gov (United States)

    Kinney, Mary V; Cocoman, Olive; Dickson, Kim E; Daelmans, Bernadette; Zaka, Nabila; Rhoda, Natasha R; Moxon, Sarah G; Kak, Lily; Lawn, Joy E; Khadka, Neena; Darmstadt, Gary L

    2015-08-01

    Progress in reducing newborn mortality has lagged behind progress in reducing maternal and child deaths. The Every Newborn Action Plan (ENAP) was launched in 2014, with the aim of achieving equitable and high-quality coverage of care for all women and newborns through links with other global and national plans and measurement and accountability frameworks. This article aims to assess country progress and the mechanisms in place to support country implementation of the ENAP. A country tracking tool was developed and piloted in October-December 2014 to collect data on the ENAP-related national milestones and implementation barriers in 18 high-burden countries. Simultaneously, a mapping exercise involving 47 semi-structured interviews with partner organizations was carried out to frame the categories of technical support available in countries to support care at and around the time of birth by health system building blocks. Existing literature and reports were assessed to further supplement analysis of country progress. A total of 15 out of 18 high-burden countries have taken concrete actions to advance newborn health; four have developed specific action plans with an additional six in process and a further three strengthening newborn components within existing plans. Eight high-burden countries have a newborn mortality target, but only three have a stillbirth target. The ENAP implementation in countries is well-supported by UN agencies, particularly UNICEF and WHO, as well as multilateral and bilateral agencies, especially in health workforce training. New financial commitments from development partners and the private sector are substantial but tracking of national funding remains a challenge. For interventions with strong evidence, low levels of coverage persists and health information systems require investment and support to improve quality and quantity of data to guide and track progress. Some of the highest burden countries have established newborn health

  8. An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals

    Science.gov (United States)

    Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi

    2017-01-01

    Objectives: To assess the implementation and evaluation phases of strategic plans in selected hospitals. Methods: We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Results: Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital’s priorities was the most important advantage of a strategic plan. Conclusion: There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning. PMID:29085637

  9. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  10. Strategic planning, implementation, and evaluation processes in hospital systems: a survey from Iran.

    Science.gov (United States)

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2014-09-28

    Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. All the investigated hospitals had a strategic plan. The obtained percentages for the items "the rate of the compliance to requirements" and "the quantity of planning facilitators" (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved.

  11. Nitrate Waste Treatment Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory; Martinez, Patrick Thomas [Los Alamos National Laboratory; Garcia, Terrence Kerwin [Los Alamos National Laboratory

    2017-07-05

    This plan is designed to outline the collection and analysis of nitrate salt-bearing waste samples required by the New Mexico Environment Department- Hazardous Waste Bureau in the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit).

  12. 75 FR 72719 - Approval and Promulgation of Implementation Plans; Idaho

    Science.gov (United States)

    2010-11-26

    ..., Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds. Dated....) or amended 05/22/2003 \\1\\ Soil Vapor 58.01.01.210. Extraction (58- 0101-0102). 2001 IBR of 58.01.01... cannot be said of Idaho's plan that it `will cause no degradation of air quality' '' and ``Idaho has made...

  13. Planning for Success: Successful Implementation of Middle Level Reorganization.

    Science.gov (United States)

    Williamson, Ronald; Johnston, J. Howard

    Drawing on the experience of public schools in Ann Arbor, Michigan, this document details a planning model and process of middle level reorganization. Following an examination of the impetus for change and how recent changes in the nation's economy, demographics, and family structure have shaped the context for educational change, collaborative…

  14. An Examination of Family Physicians Plan Implementation in Rural ...

    African Journals Online (AJOL)

    Razieh Mirzaeian

    the strengths and weaknesses of the Family Physician Plan in the Iranian villages based on the perspectives of the family physicians, managers, employees and clients in the health system in. 2014. Subjects and ...... 19.4. Lack of proper link between the physician and the middle and assistant personnel. 41.9. 25.8. 21. 11.3 ...

  15. Waste feed delivery program systems engineering implementation plan

    International Nuclear Information System (INIS)

    O'Toole, S.M.; Hendel, B.J.

    1998-01-01

    This document defines the systems engineering processes and products planned by the Waste Feed Delivery Program to develop the necessary and sufficient systems to provide waste feed to the Privatization Contractor for Phase 1. It defines roles and responsibilities for the performance of the systems engineering processes and generation of products

  16. Implementation application Concerto in ANAV for planning design modifications

    International Nuclear Information System (INIS)

    Alonso, S.; Llona, S.

    2014-01-01

    The aim of this paper is to describe the process of implementation in ANAV of this methodology in engineering design, which has improved the results in the execution of projects by reducing multitasking, task synchronization and resources without detailed and fixed schedules. (Author)

  17. Carbon Offset Forestry: Forecasting Ecosystem Effects (COFFEE) Project Implementation Plan

    Science.gov (United States)

    COFFEE will evaluate the environmental impacts of implementing various COF practices by using the amount of total ecosystem C (TEC) sequestered in forests as the integrative response metric. These evaluations will be done for current-climate and future-climate scenarios and will...

  18. Typical School Personnel Developing and Implementing Basic Behavior Support Plans

    Science.gov (United States)

    Strickland-Cohen, M. Kathleen; Horner, Robert H.

    2015-01-01

    We evaluated the ability of typical school personnel with basic behavioral training to develop and implement function-based supports for students with mild to moderate problem behaviors. Descriptive results indicated that following four 1-hr training sessions, 13 participants were able to (a) identify interventions that were and were not…

  19. Strategic Goals Implementation Plan V3.0

    Science.gov (United States)

    2009-01-01

    Service amputees . (Jun 08) (DDR&E) Ensure expeditious execution of appropriated funding to implement construction/renovation of facilities consistent...leadership vacuum . HCI/Admin In collaboration with Military Services and Defense Agencies, identify key leadership positions and provide expanded

  20. Richland Operations Office (DOE-RL) Implementation Plan for DOE Order 435.1

    International Nuclear Information System (INIS)

    FRITZ, D.W.

    2000-01-01

    The U.S. Department of Energy issued U.S. Department of Energy Order 435.1, Radioactive Waste Management, and U.S. Department of Energy Manual 435.1-1, Radioactive Waste Management Manual, on July 9, 1999, to replace U.S. Department of Energy Order 5820.2A. Compliance is required by July 9, 2000, where compliance is defined as ''implementing the requirements, or an approved implementation, or corrective action plan'' (refer to Manual, Introduction, paragraph four). This implementation plan identifies the status of each requirement for U.S. Department of Energy, Richland Operations Office Site contractors, and provides the plan, cost, and length of time required for achieving full implementation. The U.S. Department of Energy, Richland Operations Office contractors (Fluor Hanford, Incorporated, DynCorp Tri-Cities Services, Bechtel Hanford, Inc., and Pacific Northwest National Laboratory) conducted a line-by-line review of DOE Order 435.1 and associated manuals to determine which requirements were new, and which requirements already are used for compliance with the previous DOE Order 5820.2A or other requirements. The Gap Analysis for DOE Order 435.1 (HNF-5465) identified compliance gaps, along with other issues that would impact efforts for achieving compliance. The gap analysis also contained a series of assumptions made by the various projects in determining compliance status. The details and section-by-section analysis are contained in Appendix A. Some of the DOE Order 435.1 requirements invoke sections of other DOE Orders not incorporated in various U.S. Department of Energy, Richland Operations Office contracts (refer to Section 2.0, Table 2-1). Those additional DOE Orders are identified by contractor and will be left for evaluation in accordance with each contractor's requirements. No attempt was made to evaluate all of those orders at this time, although in many cases, contractors follow a similar older DOE Order, which is cited in the Appendix. In some areas

  1. Context and implementation: A concept analysis towards conceptual maturity.

    Science.gov (United States)

    Pfadenhauer, Lisa Maria; Mozygemba, Kati; Gerhardus, Ansgar; Hofmann, Bjørn; Booth, Andrew; Lysdahl, Kristin Bakke; Tummers, Marcia; Burns, Jacob; Rehfuess, Eva Annette

    2015-01-01

    Context and implementation of health interventions have received increasing attention over the past decade, in particular with respect to their influence on the effectiveness and reach of complex interventions. The underlying concepts are both considered partially mature, limiting their operationalization in research and practice. We conducted systematic literature searches and pragmatic utility (PU) concept analyses to provide a state-of-the-art assessment of the concepts of "context" and "implementation" in the health sciences to create a common understanding for their use within systematic reviews and HTA. We performed two separate searches, one for context (EMBASE, MEDLINE) and the other for implementation (Google Scholar) to identify relevant models, theories and frameworks. 17 publications on context and 35 articles on implementation met our inclusion criteria. PU concept analysis comprises three guiding principles: selection of the literature, organization and structuring of the literature, and asking analytic questions of the literature. Both concepts were analyzed according to four features of conceptual maturity, i.e., consensual definitions, clear characteristics, fully described preconditions and outcomes, and delineated boundaries. Context and implementation are highly intertwined, with both concepts influencing and interacting with each other. Context is defined as a set of characteristics and circumstances that surround the implementation effort. Implementation is conceptualized as a planned and deliberately initiated effort with the intention to put an intervention into practice. The concept of implementation presents largely consensual definitions and relatively well-defined boundaries, while distinguishing features, preconditions and outcomes are not yet fully articulated. In contrast, definitions of context vary widely, and boundaries with neighbouring concepts, such as setting and environment, are blurred; characteristics, preconditions and

  2. The essential ingredients of successful strategic planning and its implementation.

    Science.gov (United States)

    Deroth, L

    1990-09-01

    The strategic planning process initiated by the Pew Foundation through the Pritchard Report became a major preoccupation of all of the 31 faculties of veterinary medicine in the United States and Canada. It is proposed that, in order to be successful in the strategic planning process, three determinants related to perception, to personality, and to psychosocial behavior are necessary ingredients. First, the professional program should evolve in a team-spirited milieu which can inspire future veterinarians to work in teams. Second, all channels of communication should be kept open. Third, passion and enthusiasm should be the prevailing and all-encompassing characteristics of faculty endeavors. Team-spirit, communication and enthusiasm are the essential ingredients which will be needed to confront the challenges facing the profession, to look towards the future with tremendous hope, and to embrace the 21st century with eagerness.

  3. Space physics strategy: Implementation study. Volume 2: Program plan

    Science.gov (United States)

    1991-01-01

    In June, 1989, the Space Science and Applications Advisory Committee (SSAAC) authorized its Space Physics Subcommittee (SPS) to prepare a plan specifying the future missions, launch sequence, and encompassing themes of the Space Physics Division. The plan, now complete, is the product of a year-long study comprising two week-long workshops - in January and June 1990 - assisted by pre-workshop, inter-workshop, and post-workshop preparation and assessment activities. The workshops engaged about seventy participants, drawn equally from the Division's four science disciplines: cosmic and heliospheric physics, solar physics, magnetosphere physics, and ionosphere-thermosphere-mesospheric physics. An earlier report records the outcome of the first workshop; this is the report of the final workshop.

  4. Information Center Planning and Implementation Guide. Part B. Revision

    Science.gov (United States)

    1986-10-20

    Plan (IMP) a. Approval b. Funding .0 w~Ne- V. Hardware Availability a. PRIME MINI ( PRIMOS /UNIX) b. INTEL MICRO (UNLX) c. MICRO (MS-DOS) d. DA MINI e...FroiucLs Ab wii is cxplutt kno%.ILUJ. 01 ;,)I Lij-t",,-&st,. EzoJL zo1 OViijbic on Ux. int-i . levi um.irar.Imc. IKcticcg vr wil ’~V L;AC10-JIL’j t..rc

  5. Strategic and Operational Plan Implementation of Seaports (Utilization Jeddah Port

    Directory of Open Access Journals (Sweden)

    Akram Elentably

    2015-12-01

    Full Text Available The Port of Jeddah (Port released the initial version of this Strategic Plan in 2006. It was developed by Port staff, along with input, as a five-year rolling plan designed to guide the Port’s future development while keeping in mind the needs of our tenants, local community members and stakeholders, and the nation. This is the second update to the Strategic Plan since its initial release. While the Port’s overarching principles – commitment to environmental stewardship, addressing tenant needs, goods movement, economic development, and security – have remained largely unchanged, it is important for us to adapt our strategies to meet the challenges of an ever changing local and global environment. The Port is among the world’s premier ports and is a critical hub for global trade. This prominence brings with it responsibilities and expectations for the highest possible standards for efficiency, safety and security, and environmental leadership. The Port is the nation’s busiest container port and part of the world’s busiest port complex, handling 3.7 million twenty-foot equivalent units in 2013. Global trade and goods movement is Western kingdom of Saudi Arabia’s strongest industries in terms of jobs and economic activity. The Port of Jeddah powers these industries, handling almost more than a quarter of the cargo that enters the kingdom of Saudi Arabia annually. Through the Port’s activities, a lot of jobs are created in western kingdom of Saudi Arabia and over five hundred thousand nationwide. In order to maintain our position among the world’ the kingdom of Saudi Arabia premier ports, the Port is continually addressing the demands for providing modern and efficient cargo handling terminals as well as transportation and infrastructure projects. Protecting one of the nation’s most vital economic hubs is also an ongoing challenge. Finally, promoting a sustainable “grow green” philosophy and ensuring that we are the leader

  6. Practical Team-Based Learning from Planning to Implementation.

    Science.gov (United States)

    Whitley, Heather P; Bell, Edward; Eng, Marty; Fuentes, David G; Helms, Kristen L; Maki, Erik D; Vyas, Deepti

    2015-12-25

    Team-based learning (TBL) helps instructors develop an active teaching approach for the classroom through group work. The TBL infrastructure engages students in the learning process through the Readiness Assessment Process, problem-solving through team discussions, and peer feedback to ensure accountability. This manuscript describes the benefits and barriers of TBL, and the tools necessary for developing, implementing, and critically evaluating the technique within coursework in a user-friendly method. Specifically, the manuscript describes the processes underpinning effective TBL development, preparation, implementation, assessment, and evaluation, as well as practical techniques and advice from authors' classroom experiences. The paper also highlights published articles in the area of TBL in education, with a focus on pharmacy education.

  7. Providing Feasible Implementation Support: Direct Training and Implementation Planning in Consultation

    Science.gov (United States)

    Collier-Meek, Melissa A.; Sanetti, Lisa M. H.; Boyle, Ashley M.

    2016-01-01

    To deliver interventions completely and consistently (i.e., with adequate treatment integrity) and, thus, have a positive impact on student outcomes, implementers, such as teachers and paraprofessionals, often require support. To efficiently deliver implementation support, school psychologists could embed research-based strategies into their…

  8. Mechatronic Systems Analysis, Design and Implementation

    CERN Document Server

    Boukas, El-Kébir

    2012-01-01

    This book deals with the analysis, the design and the implementation of the mechatronic systems. Classical and modern tools are developed for the analysis and the design for such systems. Robust control, H-Infinity and guaranteed cost control theory are also used for analysis and design of mechatronic systems. Different controller such as state feedback, static output feedback and dynamic output feedback controllers are used to stabilize mechatronic systems. Heuristic algorithms are provided to solve the design of the classical controller such as PID, phase lead, phase lag and phase lead-lag controllers while linear matrix inequalities (LMI) algorithms are provided for finding solutions to the state feedback, static output feedback and dynamic output feedback controllers. The theory presented in the different chapters of the volume is applied to numerical examples to show the usefulness of the theoretical results. Some case studies are also provided to show how the developed concepts apply for real system. Em...

  9. 75 FR 50708 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Transportation Conformity...

    Science.gov (United States)

    2010-08-17

    ... developed under section 175A of the Act for the following transportation-related criteria pollutants: Ozone... interagency consultation. Our review used the document ``Guidance for Developing Transportation Conformity... Promulgation of Air Quality Implementation Plans; Indiana; Transportation Conformity Consultation Requirement...

  10. 76 FR 72844 - Approval and Promulgation of Air Quality Implementation Plans: South Carolina; Negative...

    Science.gov (United States)

    2011-11-28

    ..., disproportionate human health or environmental effects, using practicable and legally permissible methods, under... Available Control Technology for the Portion of York County, South Carolina,'' ``Negative Declaration for...] Approval and Promulgation of Air Quality Implementation Plans: South Carolina; Negative Declarations for...

  11. 78 FR 62455 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia...

    Science.gov (United States)

    2013-10-22

    ..., but not limited to, regulatory structure, monitoring, modeling, legal authority, and adequate... approve two State Implementation Plan (SIP) revisions submitted by the District of Columbia (hereafter... for monitoring, basic program requirements and legal authority that are designed to assure attainment...

  12. 76 FR 5276 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-01-31

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the... protection, Air pollution control, Incorporation by reference, Intergovernmental relations, Nitrogen dioxide...

  13. 78 FR 6740 - Revisions to the California State Implementation Plan, San Joaquin Valley United Air Pollution...

    Science.gov (United States)

    2013-01-31

    ... the California State Implementation Plan, San Joaquin Valley United Air Pollution Control District... revisions to the San Joaquin Valley United Air Pollution Control District (SJVUAPCD) portion of the... CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference...

  14. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct... Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD...

  15. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-10-25

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... limited disapproval of revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of.... * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management District. (1) Rule 1159...

  16. 77 FR 66780 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-11-07

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Control Measure for Architectural Coatings,'' CARB, October 2007. 4. ``Improving Air Quality with Economic...

  17. 76 FR 44493 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... approve revisions to the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan...

  18. 76 FR 70888 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-16

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Management District--SCAQMD) (1) Rule 1143, ``Consumer Paint Thinners & Multi-purpose Solvents...

  19. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan Air Quality...

  20. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion of...

  1. 78 FR 45114 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-07-26

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... the Antelope Valley Air Quality Management District (AVAQMD) portion of the California State... for the South Coast Air Quality Management District (SCAQMD). The Antelope Valley Air Pollution...

  2. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Butte County Air Quality Management...

  3. 75 FR 61367 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-10-05

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Measure for Architectural Coatings,'' CARB, October 2007. 4. ``Improving Air Quality with Economic...

  4. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-08-29

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... to the Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the..., Sacramento Metropolitan Air Quality Management District, Rule 214 (Federal New Source Review), Rule 203...

  5. 75 FR 40726 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION... Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD...

  6. 78 FR 9016 - Approval and Promulgation of Air Quality Implementation Plans; Massachusetts; Revisions to Fossil...

    Science.gov (United States)

    2013-02-07

    ... Promulgation of Air Quality Implementation Plans; Massachusetts; Revisions to Fossil Fuel Utilization and..., inspection, maintenance and testing requirements for certain fossil fuel utilization facilities, rename and... fossil fuel utilization facility regulation, source registration regulation, and new industrial...

  7. Key practices for implementing geospatial technologies for a planning and environment linkages (PEL) approach

    Science.gov (United States)

    2008-07-01

    This report presents three case studies that illustrate how geographic information systems (GIS) have been used to implement the Federal Highway Administrations (FHWA) Planning and Environment Linkages (PEL) approach. The PEL approach provides inf...

  8. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  9. 76 FR 28942 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2011-05-19

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District... Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State... proposed modifications by adding a definition for ``Federal Major Modifications'' which incorporates the...

  10. 76 FR 11082 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Oxides of Nitrogen Budget...

    Science.gov (United States)

    2011-03-01

    ... Promulgation of Air Quality Implementation Plans; Ohio; Oxides of Nitrogen Budget Trading Program; Technical... concerning 240 allowances under the Nitrogen Oxides Budget Trading Program added to the SIP by EPA rulemaking... EPA approve rule revisions [[Page 11083

  11. Strategic Enterprise Architecture Design and Implementation Plan for the Montana Department of Transportation

    Science.gov (United States)

    2016-08-01

    The purpose of this research report is to develop a Strategic Enterprise Architecture (EA) Design and Implementation Plan for the Montana Department of Transportation (MDT). Information management systems are vital to maintaining the States transp...

  12. 77 FR 3386 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Clean Vehicles Program

    Science.gov (United States)

    2012-01-24

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Clean Vehicles Program AGENCY: Environmental... vehicles (LEV II). The Clean Air Act (CAA) contains specific authority allowing any state to adopt new... CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference...

  13. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial... Quality Management District (AVAQMD) and Imperial County Air Pollution Control District (ICAPCD) portions... Technology (RACT),'' adopted on February 23, 2010. * * * * * (G) Antelope Valley Air Quality Management...

  14. 76 FR 41745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2011-07-15

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... Valley Unified Air Pollution Control District portion of the California State Implementation Plan (SIP... Valley Unified Air Pollution Control District (SJVUAPCD) Rule 4682, Polystyrene, Polyethylene, and...

  15. 75 FR 50730 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Transportation Conformity...

    Science.gov (United States)

    2010-08-17

    ... Promulgation of Air Quality Implementation Plans; Indiana; Transportation Conformity Consultation Requirement... consists of transportation conformity criteria and procedures related to interagency consultation and... meet a requirement of the Clean Air Act and Transportation Conformity regulations. DATES: Comments must...

  16. 78 FR 67952 - Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP...

    Science.gov (United States)

    2013-11-13

    ...] Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP--Memorandum... agreement (MOA) establishing transportation conformity criteria and procedures related to interagency.... This action streamlines the conformity process to allow direct consultation among agencies at the...

  17. 77 FR 59100 - Approval and Promulgation of Implementation Plans; Alabama: General and Transportation Conformity...

    Science.gov (United States)

    2012-09-26

    ... Promulgation of Implementation Plans; Alabama: General and Transportation Conformity & New Source Review... (SMC) Rule. The SIP revision also changes the State's general and transportation conformity regulations... federal general and transportation conformity regulations into the SIP. Alabama's May 2, 2011, SIP...

  18. 78 FR 78310 - Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity...

    Science.gov (United States)

    2013-12-26

    ...] Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity Memorandum of... Resources. This submission adopts a memorandum of agreement establishing transportation conformity criteria...-related control measures and mitigation measures. This proposed action streamlines the conformity process...

  19. 78 FR 68005 - Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP...

    Science.gov (United States)

    2013-11-13

    ...] Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP--Memorandum... transportation conformity criteria and procedures related to interagency consultation and enforceability of... conformity process to allow direct consultation among agencies at the Federal, state and local levels. This...

  20. 76 FR 34630 - Approval and Promulgation of Implementation Plans; New Hampshire: Prevention of Significant...

    Science.gov (United States)

    2011-06-14

    ... Promulgation of Implementation Plans; New Hampshire: Prevention of Significant Deterioration; Greenhouse Gas... Deterioration (PSD) program to establish appropriate emission thresholds for determining which new stationary... Protection Agency, EPA New England Regional Office, Office of Ecosystem Protection, 5 Post Office Square...

  1. 77 FR 60907 - Approval and Promulgation of Implementation Plans; Vermont: Prevention of Significant...

    Science.gov (United States)

    2012-10-05

    ... Promulgation of Implementation Plans; Vermont: Prevention of Significant Deterioration; Greenhouse Gas... February 14, 2011. The SIP revision modifies Vermont's Prevention of Significant Deterioration (PSD... at the U.S. Environmental Protection Agency, EPA New England Regional Office, Office of Ecosystem...

  2. 77 FR 5700 - Approval and Promulgation of Implementation Plans; New Hampshire: Prevention of Significant...

    Science.gov (United States)

    2012-02-06

    ... Promulgation of Implementation Plans; New Hampshire: Prevention of Significant Deterioration; Greenhouse Gas... revision modifies New Hampshire's Prevention of Significant Deterioration (PSD) program to establish... of Ecosystem Protection, Air Permits, Toxics, and Indoor Programs Unit, 5 Post Office Square--Suite...

  3. Implementation Plan for Chemical Industry R&D Roadmap for Nanomaterials by Design

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2006-04-01

    The purpose of this effort is to develop an implementation plan to realize the vision and goals identified in the Chemical Industry R&D Roadmap for Nanomaterials By Design: From Fundamentals to Function.

  4. 75 FR 37727 - Disapproval of California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution...

    Science.gov (United States)

    2010-06-30

    ... California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution Control District AGENCY... to the Monterey Bay Unified Air Pollution Control District (MBUAPCD) portion of the California State... Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations...

  5. 75 FR 13468 - Disapproval of California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution...

    Science.gov (United States)

    2010-03-22

    ... California State Implementation Plan Revisions, Monterey Bay Unified Air Pollution Control District AGENCY... to the Monterey Bay Unified Air Pollution Control District (MBAPCD) portion of the California State... CFR Part 52 Environmental protection, Air pollution control, Intergovernmental relations, Nitrogen...

  6. 77 FR 71109 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-11-29

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... pollution control, Incorporation by reference, Intergovernmental relations, Ozone, Reporting and...) Incorporation by reference. (A) San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD). (1) The...

  7. 77 FR 5709 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-02-06

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the... pollution control, Incorporation by reference, Intergovernmental relations, Nitrogen dioxide, Ozone...

  8. 77 FR 31499 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-05-29

    ... Atmospheric Pollution. Those revisions were submitted to EPA by the Puerto Rico Environmental Quality Board on...] Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of Puerto Rico; Administrative Changes AGENCY: Environmental Protection Agency (EPA). ACTION: Withdrawal of...

  9. We have the programme, what next? Planning the implementation of an injury prevention programme.

    Science.gov (United States)

    Donaldson, Alex; Lloyd, David G; Gabbe, Belinda J; Cook, Jill; Finch, Caroline F

    2017-08-01

    The impact of any injury prevention programme is a function of the programme and its implementation. However, real world implementation of injury prevention programmes is challenging. Lower limb injuries (LLIs) are common in community Australian football (community-AF) and it is likely that many could be prevented by implementing exercise-based warm-up programmes for players. This paper describes a systematic, evidence-informed approach used to develop the implementation plan for a LLI prevention programme in community-AF in Victoria, Australia. An ecological approach, using Step 5 of the Intervention Mapping health promotion programme planning protocol, was taken. An implementation advisory group was established to ensure the implementation plan and associated strategies were relevant to the local context. Coaches were identified as the primary programme adopters and implementers within an ecological system including players, other coaches, first-aid providers, and club and league administrators. Social Cognitive Theory was used to identify likely determinants of programme reach, adoption and implementation among coaches (eg, knowledge, beliefs, skills and environment). Diffusion of Innovations theory, the Implementation Drivers framework and available research evidence were used to identify potential implementation strategies including the use of multiple communication channels, programme resources, coach education and mentoring. A strategic evidence-informed approach to implementing interventions will help maximise their population impact. The approach to implementation planning described in this study relied on an effective researcher-practitioner partnership and active engagement of stakeholders. The identified implementation strategies were informed by theory, evidence and an in-depth understanding of the implementation context. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  10. Caribou conservation and recovery in Ontario: development and implementation of the Caribou Conservation Plan

    Directory of Open Access Journals (Sweden)

    Ted (E.R. Armstrong

    2012-03-01

    Full Text Available The range of Ontario’s woodland caribou (Rangifer tarandus caribou (forest-dwelling ecotype has receded northward substantially over many decades, leading to its current Threatened designation. Ontario released its Caribou Conservation Plan (CCP in the fall of 2009. This policy responded to public input and recommendations from the Ontario Woodland Caribou Recovery Team and the Caribou Science Review Panel, and outlines conservation and recovery actions to conserve and recover caribou. Within an adaptive management framework, the CCP builds upon a recent history of managing at large landscape scales in Ontario to implement a range management approach as the basis for recovery actions. These commitments and actions include enhanced research and monitoring, improved caribou habitat planning at the landscape scale, an integrated range analysis approach using advanced assessment tools to evaluate thresholds of habitat amount, arrangement and disturbance, the assessment of probability of persistence, consideration of cumulative effects, meeting forest management silvicultural performance requirements, consideration of caribou recovery implications when managing other wildlife, an initial focus on the southern edge of caribou distribution where threats are most significant, improved outreach and stewardship, and consideration of Aboriginal Traditional Knowledge in recovery actions. Implementation of the CCP signifies a long-term provincial commitment to caribou recovery, initially focusing on identified priorities within the CCP.

  11. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne [Idaho National Lab. (INL), Idaho Falls, ID (United States); Honma, George [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-03-01

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical information is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.

  12. Managing Water for African Cities Johannesburg City Implementation Plan Environmental Component Appraisal Report

    OpenAIRE

    Damhaug, T.

    2000-01-01

    Årsliste 2000 This is an appraisal of the environmental component of the Johannesburg City Implementation Plan under the Habitat guided programme "Managing Water for African Cities". The objective of this appraisal was to ensure the conformity of the plan with the objectives of the Regional Project and South Africa's needs and to explore the availability of domestic resources (human, institutional, and financial) required for efficient project implementation. The environmental component wi...

  13. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  14. Research on Evaluation of Conservation Planning Implementation of Nanshe Historic Village in Dongguan City

    Science.gov (United States)

    Yubin, Luo

    2017-10-01

    Conservation planning plays an important role in the protection and development of historic villages. The evaluation of conservation planning is helpful to find out the problems existing in the village protection work which helps to improve the conservation planning system. The paper briefly summarizes the conservation planning background of Nanshe historic village in Dongguan city, Guangdong province, China. The conservation planning guided the protection work of Nanshe village since 2002. It evaluates four aspects of the conservation planning implementation and effect such as protection and utilization of the ancient buildings, roadway repair, landscape and basic sanitation facilities improvement by ways of field research and questionnaire survey. There are only nineteen ancient buildings repaired and the rest of them are part of repaired or not repaired. Most of the roadways are well preserved. Only four of them are partly repaired or not repaired. Most of the villagers like to chat under the ancient banyan trees. Conservation Planning pays not much attention to the needs of the residents. Although conservation planning of Nanshe village developed the near, middle and long term target it actually took 14 years to carry out the near target. It enhances the social awareness of Nanshe village and the sense of belongings of the villagers. Most of the villagers are satisfied with the implementation of the conservation planning. Meanwhile, the paper exposes the conservation planning is too idealistic. It lacks of implementation details and the three phases of the investment funds and pays not much attention to the needs of residents.

  15. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  16. 78 FR 72608 - Approval and Promulgation of Implementation Plans; State of Missouri

    Science.gov (United States)

    2013-12-03

    ... Implementation Plan (SIP) submitted by the State of Missouri which revises the written reporting requirements for.... Mail or Hand Delivery or Courier: Amy Bhesania, Environmental Protection Agency, Air Planning and... available, e.g., CBI or other information whose disclosure is restricted by statute. Certain other material...

  17. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2011-12-06

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of..., Regulatory Planning and Review The Office of Management and Budget (OMB) has exempted this regulatory action...

  18. The Development and Implementation of a Minority Recruitment Plan: Process, Strategy and Results.

    Science.gov (United States)

    Oliver, John; Brown, Lester B.

    1988-01-01

    The planning process and results of a three-year minority student recruitment process in a school of social work are described, including effective tasks and strategies. The recruitment and retention effort consisted of six phases: gauging the environment, preinitiation, program planning and development, implementation, evaluation, and…

  19. 75 FR 48895 - Approval and Promulgation of Air Quality Implementation Plans; MN

    Science.gov (United States)

    2010-08-12

    ... Promulgation of Air Quality Implementation Plans; MN AGENCY: Environmental Protection Agency (EPA). ACTION... Plan (SIP) for sulfur dioxide (SO 2 ). The Minnesota Pollution Control Agency submitted the SIP... request would revise SIP requirements applicable to Saint Mary's Hospital, located in Rochester, Minnesota...

  20. 78 FR 12238 - Approval and Promulgation of Air Quality Implementation Plans; Charlotte, Raleigh/Durham and...

    Science.gov (United States)

    2013-02-22

    ... include compressed natural gas and electric vehicles. d. Employee commute options programs. NC DENR... Promulgation of Air Quality Implementation Plans; Charlotte, Raleigh/Durham and Winston-Salem Carbon Monoxide... maintenance plan update for CO, showing continued attainment of the 8-hour CO National Ambient Air Quality...

  1. 77 FR 66548 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Science.gov (United States)

    2012-11-06

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California... Plan, San Joaquin Valley Unified Air Pollution Control District's Rule 4352, Solid Fuel Fired Boilers...

  2. 77 FR 26475 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-05-04

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Eastern... Quality Management District (AVAQMD), Eastern Kern Air Pollution Control District (EKAPCD), and Santa... Plan (SIP). We are proposing to approve revisions to local rules that define terms used in other air...

  3. Facilitating food-related planning : Applying metacognition, cue-monitoring, and implementation intentions

    NARCIS (Netherlands)

    Verhoeven, A.A.C.

    2015-01-01

    Implementation intentions are specific if-then plans that can successfully change unwanted habits by linking the critical cue triggering the unwanted behavior to a healthier alternative. For example, in order to consume fewer unhealthy snacks while watching television, a plan could be formulated

  4. 76 FR 49391 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Rules Update

    Science.gov (United States)

    2011-08-10

    ... comments. FOR FURTHER INFORMATION CONTACT: Christos Panos, Environmental Engineer, Attainment Planning and... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2008-0448; FRL-9450-2] Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Rules Update AGENCY: Environmental Protection...

  5. 75 FR 73026 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Clean Air Interstate Rule

    Science.gov (United States)

    2010-11-29

    ... Engineer, Attainment Planning and Maintenance Section, Air Programs Branch (AR- 18J), Environmental... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2009-0515; FRL-9232-4] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Clean Air Interstate Rule AGENCY: Environmental...

  6. 76 FR 2293 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Gopher Resource, LLC

    Science.gov (United States)

    2011-01-13

    ... CONTACT: Andy Chang, Environmental Engineer, Attainment Planning and Maintenance Section, Air Programs... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2010-0675; FRL-9250-9] Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Gopher Resource, LLC AGENCY: Environmental...

  7. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1985-01-01

    This document is the second annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first annual report as necessary (DOE/RW-0003, 1984). Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. The generic approach that the Department plans to follow in deploying FIS facilities is also described

  8. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1986-12-01

    This document is the third annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first and second annual reports, as necessary. Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. A generic description of the approach that the Department plans to follow in deploying FIS facilities is also described

  9. Implementing the Bayesian paradigm in risk analysis

    International Nuclear Information System (INIS)

    Aven, T.; Kvaloey, J.T.

    2002-01-01

    The Bayesian paradigm comprises a unified and consistent framework for analyzing and expressing risk. Yet, we see rather few examples of applications where the full Bayesian setting has been adopted with specifications of priors of unknown parameters. In this paper, we discuss some of the practical challenges of implementing Bayesian thinking and methods in risk analysis, emphasizing the introduction of probability models and parameters and associated uncertainty assessments. We conclude that there is a need for a pragmatic view in order to 'successfully' apply the Bayesian approach, such that we can do the assignments of some of the probabilities without adopting the somewhat sophisticated procedure of specifying prior distributions of parameters. A simple risk analysis example is presented to illustrate ideas

  10. Experiments Planning, Analysis, and Optimization

    CERN Document Server

    Wu, C F Jeff

    2011-01-01

    Praise for the First Edition: "If you . . . want an up-to-date, definitive reference written by authors who have contributed much to this field, then this book is an essential addition to your library."-Journal of the American Statistical Association Fully updated to reflect the major progress in the use of statistically designed experiments for product and process improvement, Experiments, Second Edition introduces some of the newest discoveries-and sheds further light on existing ones-on the design and analysis of experiments and their applications in system optimization, robustness, and tre

  11. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... California State Implementation Plan; South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District portion of the California State Implementation... Submittal A. What rule did the State submit? We are approving South Coast Air Quality Management District...

  12. 78 FR 32131 - Revision to the Washington State Implementation Plan; Tacoma-Pierce County Nonattainment Area

    Science.gov (United States)

    2013-05-29

    ... Washington State Implementation Plan; Tacoma- Pierce County Nonattainment Area AGENCY: Environmental... was submitted to meet Clean Air Act (CAA) requirements related to the Tacoma-Pierce County... rules help implement the recommendations of the Tacoma-Pierce County Clean Air Task Force, an advisory...

  13. 78 FR 4804 - Revision to the Washington State Implementation Plan; Tacoma-Pierce County Nonattainment Area

    Science.gov (United States)

    2013-01-23

    ... Washington State Implementation Plan; Tacoma- Pierce County Nonattainment Area AGENCY: Environmental... Tacoma-Pierce County nonattainment area for the 2006 fine particulate matter (PM 2.5 ) National Ambient... Rules.'' The updated PSCAA rules help implement the recommendations of the Tacoma-Pierce County Clean...

  14. School Counselor Lead Initial Individual Career and Academic Plan Implementation Design

    Science.gov (United States)

    Moeder-Chandler, Markus

    2017-01-01

    In Fall of 2014 for Fountain-Fort Carson School District #8 undertook a revamping of graduation and state-mandated ICAP requirements for implementation for the graduating class of 2021. This design and implementation process included numerous stakeholders and several years of planning from Fall of 2014 to Spring of 2017. The design and…

  15. 75 FR 14116 - Approval of Implementation Plans of Wisconsin: Nitrogen Oxides Reasonably Available Control...

    Science.gov (United States)

    2010-03-24

    ... Implementation Plans of Wisconsin: Nitrogen Oxides Reasonably Available Control Technology AGENCY: Environmental... revisions incorporate provisions related to the implementation of nitrogen oxides (NO X ) Reasonably... sources of oxides of nitrogen. ``RACT'' is defined as the lowest emission limitation that a particular...

  16. 75 FR 64155 - Approval of Implementation Plans of Wisconsin: Nitrogen Oxides Reasonably Available Control...

    Science.gov (United States)

    2010-10-19

    ...-9205-8] Approval of Implementation Plans of Wisconsin: Nitrogen Oxides Reasonably Available Control..., 2009. These revisions incorporate provisions related to the implementation of nitrogen oxides (NO X... entitled, ``Guideline for Determining the Applicability of Nitrogen Oxide Requirements Under Section 182(f...

  17. 78 FR 5140 - Approval and Promulgation of Air Quality Implementation Plans; Colorado; Revisions to New Source...

    Science.gov (United States)

    2013-01-24

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Air Quality Implementation Plans; Colorado; Revisions to New Source Review Rules AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY... Colorado air quality permits; the revisions also implement other minor administrative changes and...

  18. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...

  19. Planning to break habits : Efficacy, mechanisms, and boundary conditions of implementation intentions targeting unhealthy snacking habits

    NARCIS (Netherlands)

    Adriaanse, M.A.

    2010-01-01

    Having strong goal intentions is generally not sufficient to ensure actual goal-directed behavior. However, when goal intentions are furnished with a specific type of planning, called ‘implementation intentions’, the likelihood of successful goal-striving substantially increases. Implementation

  20. 77 FR 26441 - Approval and Promulgation of Implementation Plans; North Carolina; Charlotte; Ozone 2002 Base...

    Science.gov (United States)

    2012-05-04

    ... Promulgation of Implementation Plans; North Carolina; Charlotte; Ozone 2002 Base Year Emissions Inventory... final action to approve the ozone 2002 base year emissions inventory portion of the state implementation... Air Act (CAA or Act). EPA will take action on the South Carolina submission for the ozone 2002 base...

  1. 77 FR 45304 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; The 2002 Base Year...

    Science.gov (United States)

    2012-07-31

    ... Promulgation of Air Quality Implementation Plans; Virginia; The 2002 Base Year Inventory AGENCY: Environmental... particulate matter (PM 2.5 ) 2002 base year emissions inventory portion of the Virginia State Implementation... base year PM 2.5 emissions inventory in accordance with the requirements of the Clean Air Act (CAA...

  2. The implementation of electronic services: planned or organic growth?

    Directory of Open Access Journals (Sweden)

    John Cole

    2005-11-01

    Full Text Available The literature on innovation suggests that projects are successful when rigorous project management is mixed judiciously with 'organic' development. This paper argues that organic growth can play a substantial role in the implementation of electronic services in healthcare settings. Evidence for organic growth is presented, based on a study of email use. Methods are presented for investigating email use in health service settings in the National Health Service (NHS in Bradford, England. Geographical information systems (GIS outputs and social network analyses are presented. The results demonstrate a fivefold increase in the use of email over a 13-month period, which is shown to be largely independent of the growth in the number of organisations using the network. They also demonstrate a marked increase in the complexity of the patterns of email use over the period.

  3. Global Precipitation Measurement (GPM) Ground Validation (GV) Science Implementation Plan

    Science.gov (United States)

    Petersen, Walter A.; Hou, Arthur Y.

    2008-01-01

    For pre-launch algorithm development and post-launch product evaluation Global Precipitation Measurement (GPM) Ground Validation (GV) goes beyond direct comparisons of surface rain rates between ground and satellite measurements to provide the means for improving retrieval algorithms and model applications.Three approaches to GPM GV include direct statistical validation (at the surface), precipitation physics validation (in a vertical columns), and integrated science validation (4-dimensional). These three approaches support five themes: core satellite error characterization; constellation satellites validation; development of physical models of snow, cloud water, and mixed phase; development of cloud-resolving model (CRM) and land-surface models to bridge observations and algorithms; and, development of coupled CRM-land surface modeling for basin-scale water budget studies and natural hazard prediction. This presentation describes the implementation of these approaches.

  4. Updated action plan for the implementation of measures as a consequence of the Fukushima reactor accident

    International Nuclear Information System (INIS)

    2014-01-01

    The action plan of the German government concerning the measures following the Fukushima reactor accident include the decision on the future of nuclear power in Germany, safety analyses, investigations and measures for nuclear power plants in a national frame, investigations in an international frame, planning for the implementation of CNS (Convention on nuclear safety) topics 1-3, i.e. measures to increase the robustness in German nuclear power plants, and the planning of implementation of further measures (CNS topics 4-6).

  5. Internal marketing within a health care organization: developing an implementation plan.

    Science.gov (United States)

    Hallums, A

    1994-05-01

    This paper discusses how the concept of internal marketing can be applied within a health care organization. In order to achieve a market orientation an organization must identify the needs and wants of its customers and how these may change in the future. In order to achieve this, internal marketing is a necessary step to the implementation of the organizations marketing strategy. An outline plan for the introduction of an internal marketing programme within an acute hospital trust is proposed. The plan identifies those individuals and departments who should be involved in the planning and implementation of the programme. The benefits of internal marketing to the Trust are also considered.

  6. Springfield/L-COG Energy Plan Implementation Program, Internal Energy Management Project: Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Lane Council of Governments (Or.); Tumidaj, Les

    1985-09-01

    The Internal Energy Management Project was developed as a component of the Springfield/L-COG Energy Plan Implementation Program. The project also took advantage of the ground work laid by the Lane Council of Governments through the Lane County Electric Energy Planning Program. This program, conducted in 1982 and 1983, developed detailed recommendations for Lane County cities concerning energy management and planning. Based on these recommendations, many jurisdictions committed themselves to implement energy management programs. Initially, the participating cities included Springfield, Veneta, Oakridge, Creswell, and Lowell. Two other local governments - Florence and Lane County - requested assistance once the project commenced.

  7. Development Plans in Turkey and a Managerial Analysis on Education (1963-2013 Years)

    Science.gov (United States)

    Çakir, Rahman

    2015-01-01

    The purpose of this study is that to evaluate nine educational management plans between the years 1963-2013 and one plan in the process of implementation educational management. Document analysis technique from the qualitative research methods was used in this research. Data was analyzed as three stages: description, analysis and interpretation.…

  8. Analysis of Development Plans from Communications Perspective

    Directory of Open Access Journals (Sweden)

    Zohreh Shahghasemi

    2016-12-01

    Full Text Available The movement towards the goals of "Vision plan 1404" needs the perception of the requirements to prepare plans for achieving the favorite objectives of development. With the advent of the information age, the rules of development policy-making strongly have changed in the world and also unique opportunities areprovided by variables of communications for countries that have been in early stages of development. Based on this, considering the communications in macro-level and in the political, social, economic and cultural development plans is important and necessary. This requires a review and pathology of previous plans and evaluation of their strengths and weaknesses for preparing of more comprehensive future plans. Themain question of this study is: what is the approach of development plans to communications section after Islamic revolution?  Which aspects of communications are considered, and what aspects are ignored?  This study analyzes five development plans after the revolution, by using of qualitative content analysis. Results show that in all five-year plans the focus was on hardware and quantitative dimensions of communication development and media, but qualitative and content aspects, such as the right to universal access to information, freedom to obtain and disseminate information within the constitution, freedom of speech and press, a move towards the information society and knowledge-based, also other dimensions of communications such as human, traditional and social communication has been less considered. In the fourth development plan that is "knowledge" – centered, new fields of communications has been studied comprehensively in comparison to other plans. According to these approaches and new scientific and experimental perspectives, this paper suggests further engagement in communications necessity for development policy-making.

  9. Implementing the leadership development plans of faculty education fellows: a structured approach.

    Science.gov (United States)

    Goldman, Ellen F; Wesner, Marilyn; Karnchanomai, Ornpawee; Haywood, Yolanda

    2012-09-01

    The literature about medical education faculty fellowship programs, which have grown in popularity, quantifies program characteristics, provides exemplars, and reports on delivery strategies. Evaluation is generally limited to satisfaction measures, with a few longitudinal studies of postprogram achievements, but none on the process of making these changes.The authors describe the development of faculty members' postfellowship leadership plans and a structured process to support plan implementation. They also compare the implementation of initiatives specified in individual leadership development plans of two cohorts of faculty. The participants were graduates of a fellowship program at the George Washington University School of Medicine and Health Sciences. One cohort participated in a structured process of monthly reciprocal peer coaching, followed by journaling and quarterly interviews with the program director; a second cohort functioned as a comparison with no structured process supporting them. (Study years are not provided because they could inadvertently lead to the identification of the participants.) Despite similar implementation challenges expressed by both cohorts, the cohort participating in the structured process implemented 23% more of their planned initiatives, including 2 times as many educational leadership initiatives and 3.5 times as many initiatives related to developing new curriculum. The combination of plan development, reciprocal peer coaching, journaling, and interview discussions provided faculty with focus, structure, and personal support. This structured process supporting leadership plan development and implementation can be easily transferred to other fellowship programs in medical education, adapted for use with residents and fellows, and used in similar development programs.

  10. Implementing Strategic Planning Capabilities Within the Mars Relay Operations Service

    Science.gov (United States)

    Hy, Franklin; Gladden, Roy; Allard, Dan; Wallick, Michael

    2011-01-01

    Since the Mars Exploration Rovers (MER), Spirit and Opportunity, began their travels across the Martian surface in January of 2004, orbiting spacecraft such as the Mars 2001 Odyssey orbiter have relayed the majority of their collected scientific and operational data to and from Earth. From the beginning of those missions, it was evident that using orbiters to relay data to and from the surface of Mars was a vastly more efficient communications strategy in terms of power consumption and bandwidth compared to direct-to-Earth means. However, the coordination between the various spacecraft, which are largely managed independently and on differing commanding timelines, has always proven to be a challenge. Until recently, the ground operators of all these spacecraft have coordinated the movement of data through this network using a collection of ad hoc human interfaces and various, independent software tools. The Mars Relay Operations Service (MaROS) has been developed to manage the evolving needs of the Mars relay network, and specifically to standardize and integrate the relay planning and coordination data into a centralized infrastructure. This paper explores the journey of developing the MaROS system, from inception to delivery and acceptance by the Mars mission users.

  11. France's Climate Plan. Implementation of the Grenelle Environment

    International Nuclear Information System (INIS)

    2010-01-01

    This report discusses the greenhouse gas emission reduction objectives by 2020 set by the French government within the frame of the 'Grenelle de l'Environnement' and also in compliance with France's commitments within international agreements and conferences, and indicates the share of each sector for these reductions (housing and office building, industry, energy, transports). This report first recalls the conclusions of the IPCC, indicates the observed evolutions and tendencies in the case of France, and describes the expected impacts of climate change. It gives an overview of the French climate policy and presents the methodology adopted to update the Climate Plan (scenarios, global assessment, assessment of the impact of some specific measures, cost assessment). Then, it describes French emission evolutions (globally and per sector) according to two scenarios by 2020. Global and transverse policies and measures are discussed, as well as those per sector (housing and office building, transport, industry, agriculture and forests, energy, wastes, public authorities and local communities, information and education). A global method of assessment of scenarios is presented, and an assessment of policies and measures is reported. A sensitivity study of the impact of the present crisis on France's emissions is also reported. The Kyoto protocol mechanism is described as well as the adaptation process

  12. Spatial analysis and planning under imprecision

    CERN Document Server

    Leung, Y

    1988-01-01

    The book deals with complexity, imprecision, human valuation, and uncertainty in spatial analysis and planning, providing a systematic exposure of a new philosophical and theoretical foundation for spatial analysis and planning under imprecision. Regional concepts and regionalization, spatial preference-utility-choice structures, spatial optimization with single and multiple objectives, dynamic spatial systems and their controls are analyzed in sequence.The analytical framework is based on fuzzy set theory. Basic concepts of fuzzy set theory are first discussed. Many numerical examples and emp

  13. Implementation of ways to effectively integrate health into local environmental planning

    DEFF Research Database (Denmark)

    Jakobsen, Mette Winge

    2015-01-01

    -2013) included testing of the implementation models, capacity building and expert consultation. The intervention was evaluated in 2012 and 2014 in relation to the most effective mechanisms in relation use of HIA tools, sustainable procedures for integrating a health concern and ensuring HiAP. Evaluation results...... relationship and common language for health relevant for environmental planning. Also, early involvement increased ownership. Simple tools, improving existing planning processes and creating common language for health were key learnings to ensure effective implementation of a health concern in a local planning...... process. Also, proactive approach instead of reactive is preferred. Key messages HIA is useful to improve existing planning procedures together with systematic cross-sectoral collaboration in the planning process to ensure health in all policies HIA is not directly applicable for effectively integrating...

  14. 76 FR 57845 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley; Attainment Plan for...

    Science.gov (United States)

    2011-09-16

    ... equipment and paints. \\1\\ California plans sometimes use the term Reactive Organic Gases (ROG) for VOC. These terms are essentially synonymous. For simplicity, we use the term VOC to mean either VOC or ROG...

  15. Iowa in motion : aviation system plan : implementing Iowa's state transportation plan

    Science.gov (United States)

    1999-09-14

    Iowa's system of airports provides a variety of services vital to the state's economy and is an integral part of Iowa's overall transportation system. This 1999 Iowa Aviation System Plan (IASP) addresses issues concerning the state's investment in av...

  16. MDOT implementation plan for GPS technology in planning, design, and construction delivery

    Science.gov (United States)

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  17. MDOT implementation plan for global positioning systems (GPS) technology in planning, design, and construction delivery.

    Science.gov (United States)

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  18. 76 FR 16167 - Approval and Promulgation of Implementation Plans; Oklahoma; Regional Haze State Implementation...

    Science.gov (United States)

    2011-03-22

    ...; nitrogen dioxide; ozone; lead; particulate matter; and sulfur dioxide. The plan developed by a state is... precursors (e.g., SO 2 , nitrogen oxides (NO X ), and in some cases, ammonia (NH 3 ) and volatile organic... BART. 40 CFR 51.308(e). \\9\\ In American Corn Growers Ass'n v. EPA, 291 F.3d 1 (DC Cir. 2002), the U.S...

  19. The requirements for implementing Sustainable Development Goals (SDGs) and for planning and implementing Integrated Territorial Investments (ITI) in mining areas

    Science.gov (United States)

    Florkowska, Lucyna; Bryt-Nitarska, Izabela

    2018-04-01

    The notion of Integrated Territorial Investments (ITI) appears more and more frequently in contemporary regional development strategies. Formulating the main assumptions of ITI is a response to a growing need for a co-ordinated, multi-dimensional regional development suitable for the characteristics of a given area. Activities are mainly aimed at improving people's quality of life with their significant participation. These activities include implementing the Sustainable development Goals (SDGs). Territorial investments include, among others, projects in areas where land and building use is governed not only by general regulations (Spatial Planning and Land Development Act) but also by separate legal acts. This issue also concerns areas with active mines and post-mining areas undergoing revitalization. For the areas specified above land development and in particular making building investments is subject to the requirements set forth in the Geological and Mining Law and in the general regulations. In practice this means that factors connected with the present and future mining impacts must be taken into consideration in planning the investment process. This article discusses the role of proper assessment of local geological conditions as well as the current and future mining situation in the context of proper planning and performance of the Integrated Territorial Investment programme and also in the context of implementing the SDGs. It also describes the technical and legislative factors which need to be taken into consideration in areas where mining is planned or where it took place in the past.

  20. Water quality, compliance, and health outcomes among utilities implementing Water Safety Plans in France and Spain.

    Science.gov (United States)

    Setty, Karen E; Kayser, Georgia L; Bowling, Michael; Enault, Jerome; Loret, Jean-Francois; Serra, Claudia Puigdomenech; Alonso, Jordi Martin; Mateu, Arnau Pla; Bartram, Jamie

    2017-05-01

    Water Safety Plans (WSPs), recommended by the World Health Organization since 2004, seek to proactively identify potential risks to drinking water supplies and implement preventive barriers that improve safety. To evaluate the outcomes of WSP application in large drinking water systems in France and Spain, we undertook analysis of water quality and compliance indicators between 2003 and 2015, in conjunction with an observational retrospective cohort study of acute gastroenteritis incidence, before and after WSPs were implemented at five locations. Measured water quality indicators included bacteria (E. coli, fecal streptococci, total coliform, heterotrophic plate count), disinfectants (residual free and total chlorine), disinfection by-products (trihalomethanes, bromate), aluminum, pH, turbidity, and total organic carbon, comprising about 240K manual samples and 1.2M automated sensor readings. We used multiple, Poisson, or Tobit regression models to evaluate water quality before and after the WSP intervention. The compliance assessment analyzed exceedances of regulated, recommended, or operational water quality thresholds using chi-squared or Fisher's exact tests. Poisson regression was used to examine acute gastroenteritis incidence rates in WSP-affected drinking water service areas relative to a comparison area. Implementation of a WSP generally resulted in unchanged or improved water quality, while compliance improved at most locations. Evidence for reduced acute gastroenteritis incidence following WSP implementation was found at only one of the three locations examined. Outcomes of WSPs should be expected to vary across large water utilities in developed nations, as the intervention itself is adapted to the needs of each location. The approach may translate to diverse water quality, compliance, and health outcomes. Copyright © 2017 Elsevier GmbH. All rights reserved.

  1. Understanding what asthma plans mean: a linguistic analysis of terminology used in published texts.

    Science.gov (United States)

    Ring, Nicola; Pinnock, Hilary; Wilson, Caroline; Hoskins, Gaylor; Jepson, Ruth; Wyke, Sally; Sheikh, Aziz

    2011-06-01

    To identify from the literature what terms are used for 'asthma plans', with what meaning, and in what context(s). Linguistic analysis of a selected body of asthma literature from 1989-2009. A wide range of asthma plan terminology was evident, with terms such as 'action plans', 'self-management plans' and 'treatment plans' being applied inconsistently and synonymously. For individual patients the term 'asthma plan' can describe a clinically-determined list of prescribed medication, an agreed plan to guide self-management of changing symptoms, or a more holistic 'living with asthma' plan. In some contexts the term 'asthma plan' was also used to describe an organisational system of care, which causes further ambiguity. Within the literature, a plethora of terms is used inconsistently and with varied meaning. This is a potential, but previously unrecognised, barrier to asthma plan implementation. A taxonomy of asthma plans and a standardised definitions of terms is required.

  2. Implementation of Theeuropeanwater Framework Directive In France: New Challenges For River Basin Organisat Ion, Planning and Participation

    Science.gov (United States)

    Allain, S.

    The European Water Framework Directive (2000/60/EC) establishes a system of participatory river basin planning for national and international basins. The French institutional framework for water management is already very close to this system: the 1964 Water Law actually set up basin bodies, the Agences de l'Eau ("Water Agencies"), at the level of large river basins, and multipartite basin commissions, the Comités de Bassin ("River Basin Authorities"), in order to monitor the Agences de l'Eau's policies; besides, the 1992 Water Law created a planning procedure at this level, the Schéma Directeur d'Aménagement et de Gestion des Eaux (SDAGE : "General Water Management Plan"), aiming to determine general orientations for the management of water resources and having to be defined by the Comités de Bassin. At first glance therefore, the implementation of the European Water Framework Directive should not raise a lot of problems in France. However, a quick analysis of the current situation shows that it is not so obvious : if the French Water Policy set up two basin organisations, neither of them deals concretely with the management of the water resources, and the implementation of water management plans depends on many stakeholders; the SDAGE itself only partially meets the demands of the Directive, regarding e. g. the economic analysis; finally, in spite of the creation of multipartite basin commissions, the public participation is very restricted. Such an analysis leads to pay more attention to the relations to establish between organisation, planning and participation at the level of large river basins. An analysis of other elements of the French institutional framework can help us in this way : another planning procedure was actually created by the 1992 Water Law, the Schéma d'Aménagement et de Gestion des Eaux (SAGE : "Water Management Plan"), aiming to fix general objectives to manage the water resources at the level of small river basins, and having to be

  3. Analysis of sustainable urban mobility plans

    Directory of Open Access Journals (Sweden)

    Pantić Marijana B.

    2016-01-01

    Full Text Available Solving traffic problems, rather than in a conventional manner, i.e. through the construction of infrastructure and customization requirements, began to be implemented in a different way, by applying measures to motivate users to -use passenger car less, and that more of their daily activities are reached by nonmotorized modes of movement. Sustainable urban transport plans (SUP were introduced in legislation of the EU, strategic documents that help create a better quality of life in cities. For the purposes of this study, a review of the literature related to existing plans of some major European cities was carried out, as well as small, focusing on cities of the surroundings. On this basis, the similarities and differences were ephasized in proposed measures to reach the goals of sustainable development of transportation systems. In conclusion recommendations are given on the possibility of use of experiences and applications in all the individual local communities.

  4. Issues and dilemmas in preparation and implementation of the spatial plan of the municipality

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2012-01-01

    Full Text Available Disadvantages of the Serbian planning system and dilemmas about the role of spatial planning in Serbia mainly is reflected at the local level of spatial planning. The focus of the spatial plan of the municipality from the strategic to regulatory role has been shifted by the changes of legal basis. In this paper the key issues and dilemmas in the practice of preparation and implementation of the spatial plan of the municipality in Serbia are pointed out. The review of the three key issues of importance for the direct implementation of planning solutions and concepts: identification of the construction zone, the establishment of rules for the protection, arrangement and construction of physical (natural, landscape and functional entities and settlements, and elaboration of arrangement scheme for the settlement are presented. It has still not made clear what the arrangement scheme for the settlement should represent, so that in practice there is wide variety of schemes, usually completely unenforceable. Good examples of arrangement schemes elaboration within spatial plan of the municipality have been presented and analyzed. Suggestions for improving the content of the strategic and regulatory elements of the spatial plan of the municipality, as well as recommendations to the basic content of the arrangement scheme for settlement as a part of this spatial plan are proposed.

  5. Smart meter implementation plan : report of the Board to the Minister

    International Nuclear Information System (INIS)

    2005-01-01

    This report provides detailed information about Ontario's smart meter implementation plan. The smart metering system will measure how much electricity a customer uses on an hourly basis, with data being transferred daily to local electricity distributors. Energy prices will vary according to the time of day when energy was being consumed, a system that supports current methods of charging larger customers. The plan proposes that all new and existing customers in Ontario have some type of smart meter by 2010 as part of a two-phased plan. Customers will receive timely information on consumption, and distributors will offer variable pricing plans. It was advised that costs be included in the distribution rate immediately upon installation of smart meters. Detailed information on implementation, smart metering costs, minimum requirements, and non-commodity time of use rates were presented. Critical tasks for establishing a framework for implementation included: ministerial approval of the plan; identification of a program coordinator; the establishment of a correct regulatory framework; a vendor approval process requiring appropriate permissions for radio frequency licences; technology pilots on behalf of distributors to assure adequate adaptation and the development of procedures concerning procurement, internal schedules and deployment; coordination between government, regulatory bodies and distributors towards the establishment of communication strategies, implementation plans and distributor approaches. 5 tabs., 6 figs

  6. Comparative Analysis of Competitive Strategy Implementation

    OpenAIRE

    Maina A. S. Waweru

    2011-01-01

    This paper presents research findings on Competitive Strategy Implementation which compared the levels of strategy implementation achieved by different generic strategy groups, comprising firms inclined towards low cost leadership, differentiation or dual strategic advantage. The study sought to determine the preferences for use of implementation armaments and compared how such armaments related to the level of implementation achieved. Respondents comprised 71 top executives from 59 companies...

  7. Adaptive path planning: Algorithm and analysis

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Pang C.

    1993-03-01

    Path planning has to be fast to support real-time robot programming. Unfortunately, current planning techniques are still too slow to be effective, as they often require several minutes, if not hours of computation. To alleviate this problem, we present a learning algorithm that uses past experience to enhance future performance. The algorithm relies on an existing path planner to provide solutions to difficult tasks. From these solutions, an evolving sparse network of useful subgoals is learned to support faster planning. The algorithm is suitable for both stationary and incrementally-changing environments. To analyze our algorithm, we use a previously developed stochastic model that quantifies experience utility. Using this model, we characterize the situations in which the adaptive planner is useful, and provide quantitative bounds to predict its behavior. The results are demonstrated with problems in manipulator planning. Our algorithm and analysis are sufficiently general that they may also be applied to task planning or other planning domains in which experience is useful.

  8. Planned change or emergent change implementation approach and nurses' professional clinical autonomy.

    Science.gov (United States)

    Luiking, Marie-Louise; Aarts, Leon; Bras, Leo; Grypdonck, Maria; van Linge, Roland

    2017-11-01

    Nurses' clinical autonomy is considered important for patients' outcome and influenced by the implementation approach of innovations. Emergent change approach with participation in the implementation process is thought to increase clinical autonomy. Planned change approach without this participation is thought not to increase clinical autonomy. Evidence of these effects on clinical autonomy is however limited. To examine the changes in clinical autonomy and in personal norms and values for a planned change and emergent change implementation of an innovation, e.g. intensive insulin therapy. Prospective comparative study with two geographically separated nurses' teams on one intensive care unit (ICU), randomly assigned to the experimental conditions. Data were collected from March 2008 to January 2009. Pre-existing differences in perception of team and innovation characteristics were excluded using instruments based on the innovation contingency model. The Nursing Activity Scale was used to measure clinical autonomy. The Personal Values and Norms instrument was used to assess orientation towards nursing activities and the Team Learning Processes instrument to assess learning as a team. Pre-implementation the measurements did not differ. Post-implementation, clinical autonomy was increased in the emergent change team and decreased in the planned change team. The Personal Values and Norms instrument showed in the emergent change team a decreased hierarchic score and increased developmental and rational scores. In the planned change team the hierarchical and group scores were increased. Learning as a team did not differ between the teams. In both teams there was a change in clinical autonomy and orientation towards nursing activities, in line with the experimental conditions. Emergent change implementation resulted in more clinical autonomy than planned change implementation. If an innovation requires the nurses to make their own clinical decisions, an emergent change

  9. Effect of Organizational Culture Factors on Knowledge Management Processes Implementation in Technology & Deputy Tax Planning Agency

    Directory of Open Access Journals (Sweden)

    Hamid Rahimian

    2011-10-01

    Full Text Available This research was a case study to evaluate the effect of organizational culture on knowledge management processes implementation in Technology & Deputy Tax Planning Agency was done by Survey Method. Population of the study was experts in Technology & Deputy Tax planning of the organization. Research tools included two questionnaires: the organizational culture profile and the processes of knowledge management. The first questionnaire has surveyed the seven components of organizational culture (competitiveness, social responsibility, supportiveness, innovation, emphasis on rewards, performance orientation, and stability. The second has explored six processes such as creation, capture, organization, storage, dissemination and application of knowledge. The results of this research showed that according to the experts the components of organizational culture and knowledge management were in the intermediate level. Between each of the seven components of organizational culture was 70% positive and significant relationship with knowledge management processes. Also, among each of the seven components of organizational culture was positive and significant relationship with knowledge management processes. Regression analysis gave the same result that only two components of social responsibility and performance orientation in predicting the changing role of knowledge management processes have been effective.

  10. Technical and organisational aspects in enterprise resource planning systems implementation: lessons from a Spanish public hospital

    Science.gov (United States)

    Escobar-Rodriguez, Tomas; Escobar-Pérez, Bernabe; Monge-Lozano, Pedro

    2014-09-01

    Public resources should always be managed efficiently, more so in times of crisis. Due to the specific characteristics of the healthcare sector, there is a need for special attention, especially in regards to hospitals. Administrators need useful tools to be able to efficiently manage available resources, such as enterprise resource planning (ERP) systems. Therefore, an analysis of the effects of their implementation and use in hospitals is valuable. This study has two purposes. One is to analyse the role ERP systems play in aiding the integration of hospital data, with focus on user satisfaction as well as possible resistance to change. The other purpose is to analyse the effects of implanting and using ERP systems in the hospital environment and identifying how certain variables influence the process, especially the existence of different organisational cultures. Results indicate that clinical information has become notably more integrated, despite the lack of flow in the economic-financial area. The heterogeneous nature of the different groups, clinical (Medical, Nursing) and non-clinical (Economic-Financial, Accounting), had a negative influence on the implementation process, and limited the integration of information as well as the system's performance.

  11. 77 FR 35873 - Approval, Disapproval and Promulgation of Air Quality Implementation Plan; Utah; Maintenance Plan...

    Science.gov (United States)

    2012-06-15

    ... provisions; (3) removal of budgets for sources other than on-road mobile sources; (4) changes to the trigger... removal from the maintenance plan of the budgets for area, on-road mobile, and point sources. D. Section... Standard for Salt Lake and Davis Counties AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...

  12. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  13. Stakeholders’ Perception on National Heatwave Plans and Their Local Implementation in Belgium and The Netherlands

    Directory of Open Access Journals (Sweden)

    Joris Adriaan Frank van Loenhout

    2016-11-01

    Full Text Available National heatwave plans are aimed at reducing the avoidable human health consequences due to heatwaves, by providing warnings as well as improving communication between relevant stakeholders. The objective of this study was to assess the perceptions of key stakeholders within plans in Belgium and The Netherlands on their responsibilities, the partnerships, and the effectiveness of the local implementation in Brussels and Amsterdam. Key informant interviews were held with stakeholders that had an important role in development of the heatwave plan in these countries, or its implementation in Brussels or Amsterdam. Care organisations, including hospitals and elderly care organisations, had a lack of familiarity with the national heatwave plan in both cities, and prioritised heat the lowest. Some groups of individuals, specifically socially isolated individuals, are not sufficiently addressed by the current national heatwave plans and most local plans. Stakeholders reported that responsibilities were not clearly described and that the national plan does not describe tasks on a local level. We recommend to urgently increase awareness on the impact of heat on health among care organisations. More emphasis needs to be given to the variety of heat-risk groups. Stakeholders should be involved in the development of updates of the plans.

  14. Stakeholders' Perception on National Heatwave Plans and Their Local Implementation in Belgium and The Netherlands.

    Science.gov (United States)

    van Loenhout, Joris Adriaan Frank; Rodriguez-Llanes, Jose Manuel; Guha-Sapir, Debarati

    2016-11-10

    National heatwave plans are aimed at reducing the avoidable human health consequences due to heatwaves, by providing warnings as well as improving communication between relevant stakeholders. The objective of this study was to assess the perceptions of key stakeholders within plans in Belgium and The Netherlands on their responsibilities, the partnerships, and the effectiveness of the local implementation in Brussels and Amsterdam. Key informant interviews were held with stakeholders that had an important role in development of the heatwave plan in these countries, or its implementation in Brussels or Amsterdam. Care organisations, including hospitals and elderly care organisations, had a lack of familiarity with the national heatwave plan in both cities, and prioritised heat the lowest. Some groups of individuals, specifically socially isolated individuals, are not sufficiently addressed by the current national heatwave plans and most local plans. Stakeholders reported that responsibilities were not clearly described and that the national plan does not describe tasks on a local level. We recommend to urgently increase awareness on the impact of heat on health among care organisations. More emphasis needs to be given to the variety of heat-risk groups. Stakeholders should be involved in the development of updates of the plans.

  15. Process evaluation of discharge planning implementation in healthcare using normalization process theory

    OpenAIRE

    Nordmark, Sofi; Zingmark, Karin; Lindberg, Inger

    2016-01-01

    Background Discharge planning is a care process that aims to secure the transfer of care for the patient at transition from home to the hospital and back home. Information exchange and collaboration between care providers are essential, but deficits are common. A wide range of initiatives to improve the discharge planning process have been developed and implemented for the past three decades. However, there are still high rates of reported medical errors and adverse events related to failures...

  16. IMPLEMENTING FRANCHISING INTO A BUSINESS. : Based on my own business plan.

    OpenAIRE

    Krzyzaniak, Patryk

    2016-01-01

    The aim of the thesis is to successfully implement a business system based on franchising into the author's own business. The thesis will provide information about the actual busi-ness plan, theoretical and practical investigation on how franchising would efficiently work in the Finnish market, basic principles of cooperation on a franchise basis, categories of fran-chising (in general and in cooperation with the author's business plan), advantages and dis-advantages of having franchising as ...

  17. Pre-implementation studies of a workforce planning tool for nurse staffing and human resource management in university hospitals.

    Science.gov (United States)

    van Oostveen, Catharina J; Ubbink, Dirk T; Mens, Marian A; Pompe, Edwin A; Vermeulen, Hester

    2016-03-01

    To investigate the reliability, validity and feasibility of the RAFAELA workforce planning system (including the Oulu patient classification system - OPCq), before deciding on implementation in Dutch hospitals. The complexity of care, budgetary restraints and demand for high-quality patient care have ignited the need for transparent hospital workforce planning. Nurses from 12 wards of two university hospitals were trained to test the reliability of the OPCq by investigating the absolute agreement of nursing care intensity (NCI) measurements among nurses. Validity was tested by assessing whether optimal NCI/nurse ratio, as calculated by a regression analysis in RAFAELA, was realistic. System feasibility was investigated through a questionnaire among all nurses involved. Almost 67 000 NCI measurements were performed between December 2013 and June 2014. Agreement using the OPCq varied between 38% and 91%. For only 1 in 12 wards was the optimal NCI area calculated judged as valid. Although the majority of respondents was positive about the applicability and user-friendliness, RAFAELA was not accepted as useful workforce planning system. Nurses' performance using the RAFAELA system did not warrant its implementation. Hospital managers should first focus on enlarging the readiness of nurses regarding the implementation of a workforce planning system. © 2015 John Wiley & Sons Ltd.

  18. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    International Nuclear Information System (INIS)

    Burgard, K.G.; Schaus, P.S.; Rossi, H.

    1998-01-01

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control

  19. 77 FR 4510 - Air Quality Implementation Plans; Kentucky; Attainment Plan for the Kentucky Portion of the...

    Science.gov (United States)

    2012-01-30

    ... precursors. The main chemical precursors associated with fine particle formation are SO 2 , NO X , volatile..., metals, and sea salt).'' 40 CFR 51.1000. The PM 2.5 Implementation Rule requires states to identify and... emissions are precursors to the formation of secondary organic aerosol, and significant progress has been...

  20. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste storage

    International Nuclear Information System (INIS)

    Kaspar, J.R.; Latray, D.A.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  1. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    International Nuclear Information System (INIS)

    Wecks, M.D.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  2. Recertification analysis and inspection planning for environmental test facilities

    Science.gov (United States)

    Rebeck, K. J.; Danna, R.; Miller, G. S.; Hollingsworth, R. T.

    1984-01-01

    Program development and implementation for recertification of pressure vessels used at NASA facilities are outlined, together with inspection procedures. The recertification is carried out in three phases: analysis, inspection planning, and long term inspection plans and management. A data base was developed for each piece of equipment and the associated performance parameters. Either documentation was obtained or NDT was performed on the vessels to confirm design and Code compliance. A Failure Modes and Effects Analysis technique was used to target recurring inspection items and guidelines were drawn up for inspections of parts and systems and intervals between inspections. The steps taken in establishing the program are considered applicable in both research and industrial situations.

  3. Academic Staff’s View Points on the Implementation of Lesson Plan

    Directory of Open Access Journals (Sweden)

    Leila Bazrafkan

    2009-02-01

    Full Text Available Background and purpose: Lesson plan is considered a vital component of the teacher training and successful teachers are in variably good planners and thinkers. The present study was conducted to survey the academic staff’s views about lesson plan in Shiraz University of Medical Sciences in 2001. Moreover, considering the finding of the study there was an attempt to seek the experts’ views on how to perform lesson plan practically through forming a focus group.Methods: This is a descriptive study indicating the attitudes of 152 academic staff about lesson plan. The data were collected using a questionnaire. The findings of the first stage was followed by forminga focus group in the second stage. Ten authorities and experts in the field were selected. They were interviewed on how to perform lesson plans in Shiraz university of Medical Sciences in three sessions. It was concluded that the main barrier for designing and performing the lesson plan is the academic staff’s lack of awareness about its advantages.Results: Of the population under the study, 30% were females and 70% males. The majority of the academic staff (126 individuals, 85.1% believes that they need a lesson plan in their field and thatthe implementation of lesson plan contributes to the improvement of education. 70.9% (1.5 of them believe that lesson plan does not limit the educational process. Some of their coworkers (51.5% consider lesson plan as necessary and are ready to cooperate in this way. 44.6% of them (42 state that designing a lesson plan somehow conforms to our country’s educational system. The majority of them (75.8% state that they know the “must learns” but believe that there is no sufficient education about lesson plan. The experts in the focus group presented their  recommendations with regard to lesson plan as follows:1- Continual education of the academic staff; 2- Compilations of logbook;3- Application of those sections with lesson plan; 4- Compulsory

  4. Tank waste remediation system privatization infrastructure program configuration management implementation plan

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program's products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control

  5. The contexts of implementing the enterprise resource planning system : in small and medium company

    OpenAIRE

    Zhang, Haicheng

    2012-01-01

    The purpose of this thesis is to discover the feasibility of the enterprise resource planning system (ERP) in small and medium companies (SMEs). In this thesis, the researcher will analyze the small and medium companies; adopt the environment, risk and ERP implementation life cycle. And study case, researcher will also compare the ERP system implementing in two different size companies. These can be important parts in the thesis. The cases are from Finnish brew manufacture group-Hartwall and ...

  6. IMPLEMENTATION OF THE EU NOISE DIRECTIVE IN PROCESS OF URBAN PLANNING IN POLAND

    Directory of Open Access Journals (Sweden)

    J. Kwiecień

    2013-05-01

    The main aim of this article is to introduce the influence of acoustic climate on the urban space planning in Poland through the implementation of the provisions of Directive 2002/49/WE of the European Parliament and the Council of Europe from 25 June 2002. Moreover, in the stages of an LLUP implementations have been suggested the use of a Strategic Noise Map, being a tool for assisting the process of environmental noise level assessment in Poland.

  7. Development and Implementation of South Asia’s First Heat-Health Action Plan in Ahmedabad (Gujarat, India

    Directory of Open Access Journals (Sweden)

    Kim Knowlton

    2014-03-01

    Full Text Available Recurrent heat waves, already a concern in rapidly growing and urbanizing South Asia, will very likely worsen in a warming world. Coordinated adaptation efforts can reduce heat’s adverse health impacts, however. To address this concern in Ahmedabad (Gujarat, India, a coalition has been formed to develop an evidence-based heat preparedness plan and early warning system. This paper describes the group and initial steps in the plan’s development and implementation. Evidence accumulation included extensive literature review, analysis of local temperature and mortality data, surveys with heat-vulnerable populations, focus groups with health care professionals, and expert consultation. The findings and recommendations were encapsulated in policy briefs for key government agencies, health care professionals, outdoor workers, and slum communities, and synthesized in the heat preparedness plan. A 7-day probabilistic weather forecast was also developed and is used to trigger the plan in advance of dangerous heat waves. The pilot plan was implemented in 2013, and public outreach was done through training workshops, hoardings/billboards, pamphlets, and print advertisements. Evaluation activities and continuous improvement efforts are ongoing, along with plans to explore the program’s scalability to other Indian cities, as Ahmedabad is the first South Asian city to address heat-health threats comprehensively.

  8. Development and Implementation of South Asia’s First Heat-Health Action Plan in Ahmedabad (Gujarat, India)

    Science.gov (United States)

    Knowlton, Kim; Kulkarni, Suhas P.; Azhar, Gulrez Shah; Mavalankar, Dileep; Jaiswal, Anjali; Connolly, Meredith; Nori-Sarma, Amruta; Rajiva, Ajit; Dutta, Priya; Deol, Bhaskar; Sanchez, Lauren; Khosla, Radhika; Webster, Peter J.; Toma, Violeta E.; Sheffield, Perry; Hess, Jeremy J.

    2014-01-01

    Recurrent heat waves, already a concern in rapidly growing and urbanizing South Asia, will very likely worsen in a warming world. Coordinated adaptation efforts can reduce heat’s adverse health impacts, however. To address this concern in Ahmedabad (Gujarat, India), a coalition has been formed to develop an evidence-based heat preparedness plan and early warning system. This paper describes the group and initial steps in the plan’s development and implementation. Evidence accumulation included extensive literature review, analysis of local temperature and mortality data, surveys with heat-vulnerable populations, focus groups with health care professionals, and expert consultation. The findings and recommendations were encapsulated in policy briefs for key government agencies, health care professionals, outdoor workers, and slum communities, and synthesized in the heat preparedness plan. A 7-day probabilistic weather forecast was also developed and is used to trigger the plan in advance of dangerous heat waves. The pilot plan was implemented in 2013, and public outreach was done through training workshops, hoardings/billboards, pamphlets, and print advertisements. Evaluation activities and continuous improvement efforts are ongoing, along with plans to explore the program’s scalability to other Indian cities, as Ahmedabad is the first South Asian city to address heat-health threats comprehensively. PMID:24670386

  9. Fossil energy materials program implementation plan for fiscal years 1986 through 1990

    Energy Technology Data Exchange (ETDEWEB)

    Bradley, R.A.; Carlson, P.T. (comps.)

    1986-04-01

    This program implementation for the Department of Energy Advanced Research and Technology Development (AR and TD) Fossil Energy Materials Program reviews the technical issues and the materials research and development needs of fossil energy technologies. The status and plans for research and development activities in the AR and TD Fossil Energy Materials Program to meet those needs are presented. Detailed information about these plans is provided for FY 1986 through FY 1988, and long-range plans are described for FY 1989 and 1990.

  10. Kinematic analysis for the implementation of landslide mitigation measures

    Science.gov (United States)

    Delmonaco, Giuseppe; Margottini, Claudio; Spizzichino, Daniele

    2010-05-01

    The present work is finalised at the implementation of a landslide risk mitigation master plan of the ancient citadel of Machu Picchu. After the warning launched in March 2001, by the scientific community on potential collapse of the citadel from a near-disastrous landslide event different studies have been promoted to reconstruct landslide activity and suggest landslide risk mitigation measures for the protection and conservation of Machu Picchu cultural heritage. A site-scale analysis has been implemented following the application and integration of geomechanical classifications, ambient noise measurements and structural and kinematical analysis. The geology of the area is characterized by granitoid bodies that had been emplaced in the axial zones of the main rift system that are now exposed at the highest altitudes, together with country rocks (Precambrian and Lower Paleozoic metamorphics) originally constituting the rift ‘roots'. The bedrock of the Inca citadel of Machu Picchu is mainly composed by granite and subordinately granodiorite. This is mainly located in the lower part of the slopes. Superficially, the granite is jointed in blocks with variable dimensions, promoted by local structural setting. Single blocks vary from 10-1 to about 200 m3. Soil cover, widely outcropping in the area, is mainly composed by individual blocks and subordinately by coarse materials originated by chemical and physical weathering of minerals. Regional tectonic uplift and structural setting rule the general morphological features of the area and as a consequence, landslide type and evolution. Rock falls, rock slides, debris flows and debris slides are the main landslide typologies affecting the citadel slopes. In the last mission in May 2009, elastic and deformation rock parameters have been collected using a passive seismic innovative technique based on natural microtremor measurements and geostructural scan lines elaboration. A landslide zoning of the citadel has been

  11. Risk analysis in oil spill response planning

    International Nuclear Information System (INIS)

    Chernoplekov, A.N.; Alexandrov, A.A.

    2005-01-01

    Tiered response is a basic approach to emergency plans, including oil spill response (OSR). This paper delineates a huge set of accidental scenarios within a certain tier of response generated by a computer during risk assessment. Parameters such as the amount of oil spilled, duration of discharge and types of losses should be provided in OSR scenarios. Examples of applications include offshore installations, sub sea or onshore pipelines, and localized onshore facilities. The paper demonstrates how to use risk analysis results for delineating all likely spills into groups that need a specific tier response. The best world practices and Russian regulatory approaches were outlined and compared. Corresponding algorithms were developed and their application in pipelines was presented. The algorithm combines expert's skills and spill trajectory modeling with the net environmental benefit analysis principle into the incident specific emergency response planning. 9 refs., 13 tabs., 2 figs

  12. Tool to address green roof widespread implementation effect in flood characteristics for water management planning

    Directory of Open Access Journals (Sweden)

    R. Tassi

    2015-06-01

    Full Text Available In the last decades, new approaches were adopted to manage stormwater as close to its source as possible through technologies and devices that preserve and recreate natural landscape features. Green Roofs (GR are examples of these devices that are also incentivized by city's stormwater management plans. Several studies show that GR decreases on-site runoff from impervious surfaces, however, the analysis of the effect of widespread implementation of GR in the flood characteristics at the urban basin scale in subtropical areas are little discussed, mainly because of the absence of data. Thereby, this paper shows results related to the monitoring of an extensive modular GR under subtropical weather conditions, the development of a rainfall–runoff model based on the modified Curve Number (CN and SCS Triangular Unit Hydrograph (TUH methods and the analysis of large-scale impact of GR by modelling different basins. The model was calibrated against observed data and showed that GR absorbed almost all the smaller storms and reduced runoff even during the most intense rainfall. The overall CN was estimated in 83 (consistent with available literature with the shape of hydrographs well reproduced. Large-scale modelling (in basins ranging from 0.03 ha to several square kilometers showed that the widespread use of GRs reduced peak flows (volumes around 57% (48% at source and 38% (32% at the basin scale. Thus, this research validated a tool for the assessment of structural management measures (specifically GR to address changes in flood characteristics in the city's water management planning. From the application of this model it was concluded that even if the efficiency of GR decreases as the basin scale increase they still provide a good option to cope with urbanization impact.

  13. Assessment of emergency response planning and implementation in the aftermath of major natural disasters and technological accidents

    International Nuclear Information System (INIS)

    Milligan, Patricia A.; Jones, Joseph; Walton, F.; Smith, J.D.

    2008-01-01

    Emergency planning around nuclear power plants represents some of the most mature and well developed emergency planning in the United States. Since the implementation of NUREG-0654 / FEMA-REP-1, Rev. 1, A Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants (NRC, 1980a) the licensees, local, and State agencies have developed detailed Radiological Emergency Response Programs. An important component of these plans is the evacuation of the population in the event of a general emergency condition at the plant. In January 2005, the U.S. Nuclear Regulatory Commission (NRC) published the landmark report, 'Identification and Analysis of Factors Affecting Emergency Evacuations' (NUREG/CR 6864/), which represented the most comprehensive investigation of public evacuations in the United States in more than 15 years. Since the completion of this research, several high profile evacuations have occurred, including Hurricane Katrina in New Orleans, Hurricane Rita in Houston, as well as major wildfires across the western U.S. The NRC commissioned an update to its 2005 evacuation case study publication to evaluate the evacuation experience of the selected communities (e.g., timeliness, related injuries, hazard avoidance); the level of preplanning that was in place for the affected areas and extent that the pre planned requirements were implemented during the emergency response; the critical factors contributing to the efficiency of or impediments to the evacuations (e.g., training, drills, preparedness, experience, resources, facilities, and organizational structure); and additional factors that may have contributed to less than satisfactory public response (i.e., availability of personal transportation, use of public transportation, lack of availability of shelters, etc.). The comprehensive report will be published in fall of 2008 as NUREG/CR-6981, Assessment of Emergency Response Planning and

  14. Problems of Implementation of Strategic Plans for Secondary Schools' Improvement in Anambra State

    Science.gov (United States)

    Chukwumah, Fides Okwukweka; Ezeugbor, Carol Obiageli

    2015-01-01

    This study investigated the extent of problems of strategic plans implementation for secondary schools' improvement in Anambra State, Nigeria for quality education provision. The study used a descriptive survey design paradigm. Respondents comprised 217 principals. There was no sampling. All the principals were used. Data were collected using…

  15. 77 FR 12724 - Approval and Promulgation of Implementation Plans; Georgia; Macon; Fine Particulate Matter 2002...

    Science.gov (United States)

    2012-03-02

    ... categories (i.e., point, area, nonroad mobile and on-road mobile). This inventory often forms the basis of... Emissions Inventory AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA... emissions inventory, portion of the State Implementation Plan (SIP) revision submitted by the State of...

  16. 77 FR 59156 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; The Washington County...

    Science.gov (United States)

    2012-09-26

    ... (i.e., point, area, nonroad mobile and on-road mobile). The 2002 emissions inventory was based on... Promulgation of Air Quality Implementation Plans; Maryland; The Washington County 2002 Base Year Inventory... approve the fine particulate matter (PM 2.5 ) 2002 base year emissions inventory portion of the State of...

  17. 77 FR 50964 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia; the 2002...

    Science.gov (United States)

    2012-08-23

    ...., point, area, nonroad mobile and on-road mobile). The 2002 emissions inventory was based on data... Promulgation of Air Quality Implementation Plans; District of Columbia; the 2002 Base Year Inventory AGENCY... particulate matter (PM 2.5 ) 2002 base year emissions inventory portion of the District of Columbia State...

  18. 77 FR 61513 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; The 2002 Base Year...

    Science.gov (United States)

    2012-10-10

    ..., on-road mobile sources, and biogenic sources. The pollutants that comprise the inventory are nitrogen... Promulgation of Air Quality Implementation Plans; Maryland; The 2002 Base Year Emissions Inventory for the... fine particulate matter (PM 2.5 ) 2002 base year emissions inventory portion of the Maryland State...

  19. 77 FR 73313 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; The 2002 Base Year...

    Science.gov (United States)

    2012-12-10

    ... (i.e., point, area, nonroad mobile and on-road mobile). The 2002 emissions inventory was based on... Promulgation of Air Quality Implementation Plans; Maryland; The 2002 Base Year Inventory for the Baltimore, MD... approve the fine particulate matter (PM 2.5 ) 2002 base year emissions inventory portion of the State of...

  20. 77 FR 6467 - Approval and Promulgation of Implementation Plans; Alabama, Georgia, and Tennessee: Chattanooga...

    Science.gov (United States)

    2012-02-08

    ...., point, area, nonroad mobile and on-road mobile). This inventory often forms the basis of data that are...; Particulate Matter 2002 Base Year Emissions Inventory AGENCY: Environmental Protection Agency (EPA). ACTION... 2.5 ) 2002 base year emissions inventory portion of the State Implementation Plan (SIP) revisions...

  1. 77 FR 65630 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia; The 2002...

    Science.gov (United States)

    2012-10-30

    ...- road mobile sources, and biogenic sources. The pollutants that comprise the inventory are nitrogen... Promulgation of Air Quality Implementation Plans; District of Columbia; The 2002 Base Year Emissions Inventory... is approving the fine particulate matter (PM 2.5 ) 2002 base year emissions inventory portion of the...

  2. 78 FR 14020 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; the 2002 Base Year...

    Science.gov (United States)

    2013-03-04

    ... inventory includes emissions estimates that cover the general source categories of point sources, non-road... Promulgation of Air Quality Implementation Plans; Delaware; the 2002 Base Year Emissions Inventory for the...) on April 3, 2008. The SIP revision pertains to the 2002 base year emissions inventory for the...

  3. 77 FR 12487 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Fine Particulate Matter 2002...

    Science.gov (United States)

    2012-03-01

    ... categories (i.e., point, area, nonroad mobile and on-road mobile). This inventory often forms the basis of... Emissions Inventory AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA... emissions inventory, portion of the State Implementation Plan (SIP) revision submitted by the State of...

  4. 77 FR 60626 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; The 2002 Base Year...

    Science.gov (United States)

    2012-10-04

    ..., on- road mobile sources, and biogenic sources. The pollutants that comprise the inventory are... Promulgation of Air Quality Implementation Plans; Virginia; The 2002 Base Year Emissions Inventory for the... fine particulate matter (PM 2.5 ) 2002 base year emissions inventory portion of the Virginia State...

  5. 77 FR 29540 - Approval and Promulgation of Implementation Plans; Portion of York County, SC Within Charlotte...

    Science.gov (United States)

    2012-05-18

    ...., point, area, non-road mobile and on-road mobile). This inventory often forms the basis of data that are... 1997 8-Hour Ozone Nonattainment Area; Ozone 2002 Base Year Emissions Inventory AGENCY: Environmental... ozone 2002 base year emissions inventory portion of the state implementation plan (SIP) revision...

  6. 77 FR 1873 - Approval and Promulgation of Implementation Plans; Georgia; Rome; Fine Particulate Matter 2002...

    Science.gov (United States)

    2012-01-12

    ... and on-road mobile). This inventory often forms the basis of data that are updated with more recent... Emissions Inventory AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA... emissions inventory portion of the State Implementation Plan (SIP) revision submitted by the State of...

  7. 76 FR 71886 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Science.gov (United States)

    2011-11-21

    ... the California State Implementation Plan, Placer County Air Pollution Control District and Sacramento... Pollution Control District (PCAPCD) and Sacramento Metropolitan Air Quality Management District (SMAQMD... Guidelines for Miscellaneous Metal and Plastic Parts Coatings,'' EPA-453/R-08-003, September 2008. 7...

  8. 78 FR 40940 - Lacey Act Implementation Plan; Definitions for Exempt and Regulated Articles

    Science.gov (United States)

    2013-07-09

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service 7 CFR Part 357 [Docket No. APHIS-2009-0018] RIN 0579-AD11 Lacey Act Implementation Plan; Definitions for Exempt and Regulated Articles AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Interim final rule. SUMMARY: In...

  9. 76 FR 11963 - Updating Cross-References for the Oklahoma State Implementation Plan

    Science.gov (United States)

    2011-03-04

    ...-References for the Oklahoma State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION... cross-references in the regulatory text in light of this recodification. DATES: Effective Date: These... no longer cross-reference to the portions of the state PSD program. Therefore, EPA is correcting this...

  10. 78 FR 42480 - Approval and Promulgation of Implementation Plans; Washington: Puget Sound Clean Air Agency...

    Science.gov (United States)

    2013-07-16

    ... Promulgation of Implementation Plans; Washington: Puget Sound Clean Air Agency Regulatory Updates AGENCY... Sound Clean Air Agency (PSCAA or PS Clean Air) regulations approved by the PSCAA Board in 2003, 2004... Environmental protection, Air pollution control, Incorporation by reference, Volatile organic compounds. Dated...

  11. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  12. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  13. 78 FR 59249 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-26

    ...] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...'s Designee. (i) Incorporation by Reference. (A) South Coast Air Quality Management District. (1...

  14. 75 FR 46880 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0503; FRL-9183-5] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  15. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-02-28

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Mojave Desert Air Quality Management...

  16. 77 FR 39181 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-07-02

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) AGENCY: Environmental Protection Agency (EPA... Air Quality Management District. (1) Rule 1165, ``Glass Melting Furnaces,'' amended on August 25, 2008...

  17. 78 FR 56639 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-13

    ...] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); does...

  18. 78 FR 30768 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-05-23

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  19. 76 FR 38589 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0383; FRL-9428-1] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... the Antelope Valley Air Quality Management District (AVAQMD) portion of the California State...

  20. 77 FR 74372 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-12-14

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... of South Coast Air Quality Management District (SCAQMD) Rule 317, ``Clean Air Act Non- Attainment Fee... of Appeals for the District of Columbia Circuit. South Coast Air Quality Management District v. EPA...

  1. 77 FR 53773 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-09-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9711-2] Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  2. 77 FR 11992 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-02-28

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... limited disapproval of revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of...,'' Northeast States for Coordinated Air Use Management, December 2000. B. Does the rule meet the evaluation...

  3. 78 FR 5305 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-01-25

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  4. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-28

    ... California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District (SCAQMD) portion of the California State...) * * * (411) * * * (i) * * * (F) South Coast Air Quality Management District. (1) Rule 463, ``Organic Liquid...

  5. 75 FR 32293 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California... submit regulations that control the primary and secondary National Ambient Air Quality Standards (NAAQS...

  6. 78 FR 25011 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-04-29

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  7. 76 FR 50128 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-12

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... not a ``significant regulatory action'' subject to review by the Office of Management and Budget under...

  8. 77 FR 13495 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-03-07

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...

  9. 75 FR 46845 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California..., this action: Is not a ``significant regulatory action'' subject to review by the Office of Management...

  10. 76 FR 29182 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0030; FRL-9308-4] Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... the Mojave Desert Air Quality Management District (MDAQMD) portion of the California State...

  11. 78 FR 49925 - Revisions to California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air...: EPA is taking direct final action to approve revisions to the Antelope Valley Air Quality Air Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions of the...

  12. 77 FR 58076 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-09-19

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Standards (NAAQS). The revisions to the primary and secondary Lead NAAQS were to provide increased...

  13. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0394; FRL-9845-4] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  14. 76 FR 78871 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0897; FRL-9499-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  15. 77 FR 12493 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of.... * * * * * (c) * * * (378) * * * (i) * * * (E) Feather River Air Quality Management District. (1) Rule 3.22...

  16. 78 FR 63934 - Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management...

    Science.gov (United States)

    2013-10-25

    ...] Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management District... California for the El Dorado County Air Quality Management District (EDAQMD) portion of the California SIP... 24, 1987 Federal Register, May 25, 1988, U.S. EPA, Air Quality Management Division, Office of Air...

  17. 76 FR 40303 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-08

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... limited disapproval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of... designated nonattainment for the fine particulate matter (PM2.5) National Ambient Air Quality Standards...

  18. 75 FR 25798 - Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0286; FRL-9138-7] Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California State...

  19. 78 FR 37757 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-06-24

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Index rather than on 1-hour ozone forecasted values; (b) forecast criteria for allowing a...

  20. 76 FR 41744 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9432-1] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  1. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California... Governor's Designee. (i) Incorporation by reference. (A) South Coast Air Quality Management District. (1...

  2. 77 FR 1895 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-01-12

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve South Coast Air Quality Management District (SCAQMD) Rule 317, ``Clean Air Act Non- Attainment Fee... Air Quality Management District There are two 1-hour ozone nonattainment areas within the jurisdiction...

  3. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM...

  4. 76 FR 29153 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... approve revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of the California... approving with the dates that they were adopted by the Mojave Desert Air Quality Management District (MDAQMD...

  5. 77 FR 32398 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... action: Is not a ``significant regulatory action'' subject to review by the Office of Management and...

  6. 78 FR 18244 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-26

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...'' subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October...

  7. 76 FR 24372 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Update to Materials...

    Science.gov (United States)

    2011-05-02

    ... Emissions From Industrial Process Operations New Castle County.'' 12. Regulation 1112 ``Control of Nitrogen Oxide Emissions.'' 13. Regulation 1113 ``Open Burning'' (except sections 1.0, 2.0, and 7.0). 14... the State Implementation Plans.'' 25. Regulation 1139 ``Nitrogen Oxides (NO X ) Budget Trading Program...

  8. 76 FR 52278 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Update to Materials...

    Science.gov (United States)

    2011-08-22

    ... Regulation. Solid Air Fresheners and Toilet and Urinal Care Products. 26.11.32.11 Innovative Products-- 6/18... of Air Quality Implementation Plans; Maryland; Update to Materials Incorporated by Reference AGENCY... available for public inspection at the National Archives and Records Administration (NARA), the Air and...

  9. 75 FR 34964 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Amendment to...

    Science.gov (United States)

    2010-06-21

    ..., (4) air fresheners, (5) adhesives, (6) bait station insecticides, and (7) fragrances. 6. Establishes... Promulgation of Air Quality Implementation Plans; Pennsylvania; Amendment to Consumer Products and... under the Clean Air Act (CAA). DATES: Written comments must be received on or before July 21, 2010...

  10. 76 FR 62004 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    Science.gov (United States)

    2011-10-06

    ... establishes lower VOC limits for Double Phase Aerosol Air Fresheners and establishes new limits for Multi... are proposing to approve today contains a more stringent limit for Double Phase Aerosol Air Fresheners... the California State Implementation Plan, California Air Resources Board--Consumer Products AGENCY...

  11. 78 FR 24992 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia; Volatile...

    Science.gov (United States)

    2013-04-29

    .../30/11 4/29/13 [Insert page number where the Title Changed. Solid Air Fresheners document begins]. And... Promulgation of Air Quality Implementation Plans; District of Columbia; Volatile Organic Compounds Emissions... and the negative declarations in accordance with the requirements of the Clean Air Act (CAA). DATES...

  12. Clinical implementation of coverage probability planning for nodal boosting in locally advanced cervical cancer

    DEFF Research Database (Denmark)

    Ramlov, Anne; Assenholt, Marianne S; Jensen, Maria F

    2017-01-01

    PURPOSE: To implement coverage probability (CovP) for dose planning of simultaneous integrated boost (SIB) of pathologic lymph nodes in locally advanced cervical cancer (LACC). MATERIAL AND METHODS: CovP constraints for SIB of the pathological nodal target (PTV-N) with a central dose peak...

  13. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  14. 40 CFR 52.1977 - Content of approved State submitted implementation plan.

    Science.gov (United States)

    2010-07-01

    ..., except (6)(c) (10/14/99) 252-0210Consequences of Control Strategy Implementation Plan Failures, except (1...-0170Oxygenated Gasoline Blending (10/14/99) 258-0180Registration (10/14/99) 258-0190CAR, Distributor and Retail Outlet Operating Permits (10/14/99) 258-0200Owners of Gasoline at Terminals, Distributors and Retail...

  15. 78 FR 40966 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport...

    Science.gov (United States)

    2013-07-09

    ... Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport of Fine Particulate Matter..., 2009, to address interstate transport for the 2006 PM 2.5 NAAQS. Based on EPA's evaluation of the State... 2.5 and Interstate Transport regarding noninterference with other states' programs for PSD for the...

  16. 78 FR 15664 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport...

    Science.gov (United States)

    2013-03-12

    ... Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport of Fine Particulate Matter... Order Reviews I. Background A. 2006 PM 2.5 NAAQS and Interstate Transport Section 110(a)(2)(D)(i) of the CAA identifies four distinct elements related to the evaluation of impacts of interstate transport of...

  17. 77 FR 12482 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Science.gov (United States)

    2012-03-01

    ... Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY... incorporates the National Ambient Air Quality Standards (NAAQS) for Pb promulgated by EPA in 2008. DATES: This... FR 66964) and codified at 40 CFR 50.16, ``National primary and secondary ambient air quality...

  18. 75 FR 65572 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards... apply to Ohio's SIP. Incorporating the air quality standards into Ohio's SIP helps assure that...

  19. 78 FR 19990 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2013-04-03

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards; Correction AGENCY... approved revisions to Ohio regulations that consolidated air quality standards in a new chapter of rules... State's air quality standards into Ohio Administrative Code (OAC) 3745-25 and modifying an assortment of...

  20. Description and Rationale for the Planning, Monitoring, and Implementation (PMI) Model: Rationale.

    Science.gov (United States)

    Cort, H. Russell

    The rationale for the Planning, Monitoring, and Implementation Model (PMI) is the subject of this paper. The Superintendent of the District of Columbia Public Schools requested a model for systematic evaluation of educational programs to determine their effectiveness. The school system's emphasis on objective-referenced instruction and testing,…

  1. Description and Rationale for the Planning, Monitoring, and Implementation (PMI) Model: Description.

    Science.gov (United States)

    Ford, Valeria A.

    The design of the Planning, Monitoring, and Implementation Model (PMI) and the aspects of the model that make it useful in public schools are the topics of this paper. After the objectives of a program or operation have been identified, the model specifies three additional pieces of information that are needed for an evaluation: inputs, processes,…

  2. 77 FR 37359 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-06-21

    ... develop and incorporate food waste emission factors to more accurately characterize the VOC emissions from... the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC... Emission Reductions from 7-8-11 11-18-11 Greenwaste Composting Operations. SJVUAPCD 4566 Organic Material...

  3. Reciprocal Peer Coaching: A Critical Contributor to Implementing Individual Leadership Plans

    Science.gov (United States)

    Goldman, Ellen; Wesner, Marilyn; Karnchanomai, Ornpawee

    2013-01-01

    Billions of dollars are spent annually on programs to develop organizational leaders, yet the effectiveness of these programs is poorly understood. Scholars advise that value is enhanced by the development of individual leadership plans at program completion, followed by implementation experience with subsequent coaching and reflection. The…

  4. 76 FR 16358 - Approval and Promulgation of Air Quality Implementation Plans; Connecticut, Maine, New Hampshire...

    Science.gov (United States)

    2011-03-23

    ... enforceable emission limits on ozone precursors; any judgment about whether those emission limits discharge... attainment demonstration modeling efforts conducted by the Ozone Transport Commission. Connecticut, Maine... Implementation Plans; Connecticut, Maine, New Hampshire and Rhode Island; Infrastructure SIPs for the 1997 Ozone...

  5. 77 FR 235 - Approval and Promulgation of Air Quality Implementation Plans; Colorado; Procedural Rules...

    Science.gov (United States)

    2012-01-04

    ... Promulgation of Air Quality Implementation Plans; Colorado; Procedural Rules; Conflicts of Interest AGENCY... of Colorado's procedural rules as adopted by the Air Quality Control Commission (Commission) on... of This Action EPA is proposing to fully approve Section 1.11 of Colorado's procedural rules, adopted...

  6. 77 FR 65627 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Deferral for CO2

    Science.gov (United States)

    2012-10-30

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2012-0169; FRL-9745-5] Approval and Promulgation of Air Quality Implementation Plans; Virginia; Deferral for CO2 Emissions From Bioenergy and other Biogenic Sources Under the Prevention of Significant Deterioration Program AGENCY: Environmental Protection...

  7. 78 FR 58184 - Approval and Promulgation of Implementation Plans; North Carolina; Removal of Stage II Gasoline...

    Science.gov (United States)

    2013-09-23

    ...] Approval and Promulgation of Implementation Plans; North Carolina; Removal of Stage II Gasoline Vapor... measures for new and upgraded gasoline dispensing facilities in the State. The September 18, 2009, SIP... .0953), entitled Vapor Return Piping for Stage II Vapor Recovery, for all new or improved gasoline tanks...

  8. 76 FR 40246 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Control of Gasoline...

    Science.gov (United States)

    2011-07-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2006-0976; FRL-9430-5] Approval and Promulgation of Air Quality Implementation Plans; Ohio; Control of Gasoline Volatility; Correction AGENCY... a gasoline Reid Vapor Pressure (RVP) limit of 7.8 pounds per square inch (psi) for gasoline sold in...

  9. 78 FR 34966 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Removal of Gasoline...

    Science.gov (United States)

    2013-06-11

    ... Promulgation of Air Quality Implementation Plans; Wisconsin; Removal of Gasoline Vapor Recovery From Southeast... specifically installed at gasoline dispensing facilities (GDF) and capture the refueling fuel vapors at the gasoline pump nozzle. The system carries the vapors back to the underground storage tank at the GDF to...

  10. 78 FR 34303 - Approval and Promulgation of Implementation Plans; North Carolina; Removal of Stage II Gasoline...

    Science.gov (United States)

    2013-06-07

    ... Promulgation of Implementation Plans; North Carolina; Removal of Stage II Gasoline Vapor Recovery Program..., 2009, for the purpose of removing Stage II vapor control requirements for new and upgraded gasoline... Piping for Stage II Vapor Recovery, for all new or improved gasoline tanks. In addition, rule 15A-02D...

  11. 78 FR 65875 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Removal of Gasoline...

    Science.gov (United States)

    2013-11-04

    ...] Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Removal of Gasoline Vapor... Administrative Code, Chapter NR 420 Control of Organic Compound Emissions from Petroleum and Gasoline Sources... FROM PETROLEUM AND GASOLINE SOURCES. NR 420.01 as published in the (Wisconsin) Register, February, 1990...

  12. Implementability Of Municipal Transport Master Plan Of Bandipur Inner Ring Road Tanahun Nepal

    Directory of Open Access Journals (Sweden)

    Anjay Kumar Mishra

    2017-08-01

    Full Text Available The overall objective of this study is to assess the implementability of Municipal Transport Master Plan with the assessment of Bandipur Inner Ring Road. Various literatures were reviewed to assess the planning adopted approaches and implementability related with the transportation master plan. Data were collected through Questionnaire survey Interviews and Focus Group Discussions. Technical Survey was also conducted for assessing compliance level of technical parameters of ring road. Traffic Count Survey and Household Survey were carried out to analyze the traffic situation of ring road. Possible budget allocation and possible budget requirement for ring road were calculated for five years FY 201617 to FY 202021 and determined the possible financial gap. Results were assessed with the indicators of implementability rational legitimate feasible politically viable and socially acceptable. The result showed that still 2.64km section of ring road is earthen where total length of road is 3.9km. Just 500m lined and 460m dry side drain is constructed throughout the ring road. It complies 70.59 technical parameters of Village Road Standards and only 6.25 of Urban Road Standards but 510 vehicles including motorcycle 567 PCU run on this road per day from two sides. The road is found overloaded. MTMP report has just prepared in municipality and 93 of total respondents has accepted that MTMP is prepared adopting Participatory and Bottom Up planning Approach. MTMP is implementable by generating internal revenue.

  13. 78 FR 18849 - Disapproval of Implementation Plan Revisions; State of California; South Coast VMT Emissions...

    Science.gov (United States)

    2013-03-28

    ... the Los Angeles-South Coast Air Basin Area (``South Coast'') \\2\\ as ``extreme'' nonattainment for the... AGENCY 40 CFR Part 52 Disapproval of Implementation Plan Revisions; State of California; South Coast VMT... the Clean Air Act for the Los Angeles-South Coast Air Basin 1-hour and 8-hour ozone nonattainment...

  14. 77 FR 12491 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0020; FRL-9634-3] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and San... Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air Pollution...

  15. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-02-14

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0064; FRL-9777-7] Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State...

  16. 78 FR 23492 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Particulate Matter Air...

    Science.gov (United States)

    2013-04-19

    ... by the Indiana Department of Environmental Management (IDEM) on January 30, 2013, to revise the... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2013-0083; FRL-9804-6] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Particulate Matter Air Quality Standards AGENCY...

  17. 78 FR 78726 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Volatile Organic Compound...

    Science.gov (United States)

    2013-12-27

    ... request from the Indiana Department of Environmental Management to revise its volatile organic compound... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2012-0453; FRL-9904-35-Region 5] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Volatile Organic Compound Emission...

  18. 78 FR 37118 - Approval and Promulgation of Air Quality Implementation Plans; Charlotte, Raleigh/Durham and...

    Science.gov (United States)

    2013-06-20

    ... the core maintenance area exists; c. alternative fuel vehicle programs to include compressed natural... Promulgation of Air Quality Implementation Plans; Charlotte, Raleigh/Durham and Winston-Salem Carbon Monoxide... (CO), showing continued attainment of the 8-hour CO national ambient air quality standard for the...

  19. 76 FR 63574 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Miscellaneous Metal and...

    Science.gov (United States)

    2011-10-13

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2010-1001; FRL-9478-5] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Miscellaneous Metal and Plastic Parts Surface... Indiana's miscellaneous metal and plastic parts surface coating rules. These rules are approvable because...

  20. Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms

    Science.gov (United States)

    Zeng, Yajun

    2010-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…