WorldWideScience

Sample records for alternative work schedules

  1. Alternative Work Schedules Increase Employee Satisfaction.

    Science.gov (United States)

    Turney, John R.; Cohen, Stanley L.

    1983-01-01

    Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)

  2. Flexible Workplace Policies: Lessons from the Federal Alternative Work Schedules Act

    Science.gov (United States)

    Liechty, Janet M.; Anderson, Elaine A.

    2007-01-01

    This case study uses a feminist framework to examine the 7-year process by which the Federal Alternative Work Schedules Act (1978-1985) became law and the reasons for reenergized implementation in the 1990s. We analyze the legislative discourse for rationale in support of and opposition to this policy, connect findings to current flexible work…

  3. The Effect of Alternative Work Schedules (AWS) on Performance During Acquisition Based Testing at the U.S. Army Aberdeen Test Center

    Science.gov (United States)

    2014-09-01

    week Telework/ Telecommuting  “[t]he term ’telework’ or ’teleworking’ refers to a work flexibility arrangement under which an employee performs the...including: flextime, telecommuting , compressed work schedules and job sharing. All employees of KPMG are eligible to take advantage of the workplace...flextime, compressed work schedules and telecommuting (also known as virtual office at Kodak). Although Kodak, like ATC, has not analyzed data to

  4. Effects of industrialization on working schedules.

    Science.gov (United States)

    Kogi, K

    1976-12-01

    Recent increase in industrialization has resulted in attention being drawn to diversity of working schedules and their interrelation with content of work. The results of joint research revealed that adaptation to industrial jobs is made difficult because of urban conditions and modern work-control systems, such as workers in flexible-working-time systems who apparently favored regular daily working cycles. Long overtime work in smaller undertakings and the spread of shift systems are two important features of industrial work schedules, each being dominant among skilled and non-skilled jobs. Another important facet is the problem of intra-shift work-rest schedules significant for machine operations and vigilance tasks. It is suggested that phases of work that become intolerable are correlated with unnatural work rhythms. More emphasis should thus be laid on both phase-shifted work and non-self-governing work, the key factor being the relevance of attained data to real work in the whole course of schedules of work and rest.

  5. Prioritizing sleep for healthy work schedules

    Directory of Open Access Journals (Sweden)

    Takahashi Masaya

    2012-03-01

    Full Text Available Abstract Good sleep is advantageous to the quality of life. Sleep-related benefits are particularly helpful for the working class, since poor or inadequate amounts of sleep degrade work productivity and overall health. This review paper explores the essential role of sleep in healthy work schedules and primarily focuses on the timing of sleep in relation to the work period (that is, before, during and after work. Data from laboratory, field and modeling studies indicate that consistent amounts of sleep prior to work are fundamental to improved performance and alertness in the workplace. In addition, planned naps taken during work maintain appropriate levels of waking function for both daytime and night-time work. Clearly, sufficient sleep after work is vital in promoting recovery from fatigue. Recent data also suggest that the time interval between shifts should be adjusted according to the biological timing of sleep. Although sleep is more likely to be replaced by job and other activities in the real life, research shows that it is worthwhile to revise the work schedules in order to optimize sleep before, sometime during and after the work period. Therefore, we suggest establishing work-sleep balance, similar to work-life balance, as a principle for designing and improving work schedules.

  6. Parental Work Schedules and Adolescent Risky Behaviors

    Science.gov (United States)

    Han, Wen-Jui; Miller, Daniel P.; Waldfogel, Jane

    2010-01-01

    Using a large contemporary data set (the National Longitudinal Survey of Youth-Child Supplement), the authors examined the effects of parental work schedules on adolescent risky behaviors at age 13 or 14 and the mechanisms that might explain them. Structural equation modeling suggests mothers who worked more often at night spent significantly less…

  7. 5 CFR 610.121 - Establishment of work schedules.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Establishment of work schedules. 610.121 Section 610.121 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS HOURS OF DUTY Weekly and Daily Scheduling of Work Work Schedules § 610.121 Establishment of work schedules....

  8. Effects of Reinforcer Magnitude and Distribution on Preference for Work Schedules

    Science.gov (United States)

    Ward-Horner, John C.; Pittenger, Alexis; Pace, Gary; Fienup, Daniel M.

    2014-01-01

    When the overall magnitude of reinforcement is matched between 2 alternative work schedules, some students prefer to complete all of their work for continuous access to a reinforcer (continuous work) rather than distributed access to a reinforcer while they work (discontinuous work). We evaluated a student's preference for continuous work by…

  9. Withdrawing from Iraq: Alternative Schedules, Associated Risks, and Mitigating Strategies

    Science.gov (United States)

    2009-01-01

    Iraq and the mainte- nance of stability. There is no guarantee that Iran would cooperate, although it might do so if it believes it would gain influence...Shahery, Martha Dunigan, Keith Gierlack, Todd C. Helmus, Renny McPherson, and Olga Oliker. 52 Withdrawing from Iraq: Alternative Schedules, Associated...letter to the MNF-I, February 27, 2009a. ———, interview with ABC reporter Martha Raddatz, Baghdad, March 10, 2009b. The Office of the UN High Commissioner

  10. An Evaluation of the Sheridan County School District Alternative School Schedule, 1982-83.

    Science.gov (United States)

    Nelson, Steven R.

    During the 1982-83 school year, the Sheridan County School District implemented a 4-day school week alternative schedule. The alternative schedule was approved by the Wyoming State Board of Education on two conditions. First, the State Attorney General must affirm the State Board's right to permit alternative scheduling. Second, an outside…

  11. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  12. Optimal scheduling of logistical support for an emergency roadway repair work schedule

    Science.gov (United States)

    Yan, S.; Lin, C. K.; Chen, S. Y.

    2012-09-01

    The completion of every disaster rescue task performed by repair work teams relies on the in-time supply of materials to the rescue workers. Up to now, logistical support planning for emergency repair work in Taiwan has been done manually, which is neither effective nor efficient. To remedy the problem, this study presents a logistical support scheduling model for the given emergency repair work schedule. The objective is to minimize the short-term operating cost subject to time constraints and other related operating constraints. This model is formulated as an integer multiple-commodity network flow problem which is characterized as NP-hard. A heuristic algorithm, based on the problem decomposition and variable fixing techniques, is also proposed to efficiently solve this problem. Computational tests are performed using data from Taiwan's 1999 Chi-Chi earthquake. The results show that the model and the solution algorithm would be useful for the logistical support scheduling.

  13. Non-standard work schedules, gender, and parental stress

    Directory of Open Access Journals (Sweden)

    Mariona Lozano

    2016-02-01

    Full Text Available Background: Working non-standard hours changes the temporal structure of family life, constraining the time that family members spend with one another and threatening individuals' well-being. However, the empirical research on the link between stress and non-standard schedules has provided mixed results. Some studies have indicated that working non-standard hours is harmful whereas others have suggested that working atypical hours might facilitate the balance between family and work. Moreover, there is some evidence that the association between stress and non-standard employment has different implications for men and women. Objective: This paper examines the association between non-standard work schedules and stress among dual-earner couples with children. Two research questions are addressed. First, do predictability of the schedule and time flexibility moderate the link between non-standard work hours and stress? Second, do non-standard schedules affect men's and women's perceptions of stress differently? Methods: We use a sample of 1,932 working parents from the Canadian 2010 General Social Survey, which includes a time-use diary. A sequential logit regression analysis stratified by gender is employed to model two types of result. First, we estimate the odds of being stressed versus not being stressed. Second, for all respondents feeling stressed, we estimate the odds of experiencing high levels versus moderate levels of stress. Results: Our analysis shows that the link between non-standard working hours and perceived stress differs between mothers and fathers. First, fathers with non-standard schedules appear more likely to experience stress than those working standard hours, although the results are not significant. Among mothers, having a non-standard schedule is associated with a significantly lower risk of experiencing stress. Second, the analysis focusing on the mediating role of flexibility and predictability indicates that

  14. Fatigue Minimization Work Shift Scheduling for Air Traffic Controllers

    Directory of Open Access Journals (Sweden)

    Ta-Chung Wang

    2013-05-01

    Full Text Available It is common for Air Traffic Controllers to control air traffic during the night and to experience fatigue. Although fatigue is not the direct cause of aviation accidents, 21 percent of accidents are fatigue-related. Therefore countries and companies have tried to regulate work hours to avoid extreme fatigue, thus decreasing human error resulting from fatigue. However, these regulations may not reflect that actual fatigue variation and fatigue levels can be decreased still more by scheduling appropriately. This paper focuses on optimal work shift scheduling to reduce air traffic controller fatigue. First, a mathematical model is established to describe fatigue levels. The objective function is to reduce the fatigue peak produced by work shifts as much as possible. Various constraints, such as holidays and manpower requirements are considered. The optimization problem is then solved using integer programming. We take a sample schedule and draw conclusions by comparing our results with the original fatigue levels.

  15. Nonstandard Work Schedules and Partnership Quality : Quantitative and Qualitative Findings

    NARCIS (Netherlands)

    Mills, Melinda; Taht, Kadri; Täht, K.

    2010-01-01

    This article questions existing findings and provides new evidence about the consequences of nonstandard work schedules on partnership quality. Using quantitative couple data from The Netherlands Kinship Panel Study (NKPS) (N = 3,016) and semistructured qualitative interviews (N = 34), we found that

  16. 48 CFR 852.236-84 - Schedule of work progress.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Schedule of work progress. 852.236-84 Section 852.236-84 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS...., “Excavation”, “Floor Tile”, “Finish Carpentry”, etc., should be plotted along the vertical axis and...

  17. A Comparison of Dense-to-Lean and Fixed Lean Schedules of Alternative Reinforcement and Extinction

    Science.gov (United States)

    Hagopian, Louis P.; Toole, Lisa M.; Long, Ethan S.; Bowman, Lynn G.; Lieving, Gregory A.

    2004-01-01

    Behavior-reduction interventions typically employ dense schedules of alternative reinforcement in conjunction with operant extinction for problem behavior. After problem behavior is reduced in the initial treatment stages, schedule thinning is routinely conducted to make the intervention more practical in natural environments. In the current…

  18. Work and Work Alternatives for Disabled Young People.

    Science.gov (United States)

    Kuh, D.; And Others

    1988-01-01

    The study compared the past and current work and work alternatives experienced by 383 disabled young people (aged 16-25 years) and 152 able-bodied controls in East Devon, United Kingdom. Also compared were the aspirations and expectations of the disabled with those of their families and service providers. (Author/DB)

  19. 5 CFR 610.122 - Variations in work schedules for educational purposes.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Variations in work schedules for educational purposes. 610.122 Section 610.122 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS HOURS OF DUTY Weekly and Daily Scheduling of Work Work Schedules § 610.122...

  20. PHENIX Work Breakdown Structure. Cost and schedule review copy

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds are shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate shows Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.

  1. Helping Children Understand Routines and Classroom Schedules. What Works Briefs.

    Science.gov (United States)

    Ostrosky, M. M.; Jung, E. Y.; Hemmeter, M. L.; Thomas, D.

    Studies have documented that schedules and routines influence children's emotional, cognitive, and social development. Predictable and consistent schedules in preschool classrooms help children feel secure and comfortable. Also, schedules and routines help children understand the expectations of the environment and reduce the frequency of behavior…

  2. Nonstandard Maternal Work Schedules: Implications for African American Children's Early Language Outcomes

    Science.gov (United States)

    Odom, Erika C.; Vernon-Feagans, Lynne; Crouter, Ann C.

    2013-01-01

    In this study, observed maternal positive engagement and perception of work-family spillover were examined as mediators of the association between maternal nonstandard work schedules and children's expressive language outcomes in 231 African American families living in rural households. Mothers reported their work schedules when their child was 24…

  3. Demystifying Alternative Education: Considering What Really Works

    Science.gov (United States)

    Powell, Diane E.

    2003-01-01

    The effectiveness of alternative programs requires an understanding of both research and practice. Essential components of alternative educational programs must include opportunities to build and foster resilience in our youth. Program elements must be reflective of the quality and standards mandated by the "No Child Left Behind Act of 2001."…

  4. The Alternative Workplace: Changing Where and How People Work.

    Science.gov (United States)

    Apgar, Mahlon, IV

    1998-01-01

    Discusses the alternative workplace, the combination of nontraditional work practices, settings, and locations that is beginning to supplement traditional offices. Looks at myths and realities, options, advantages and disadvantages, and implementation of alternative workplaces. (JOW)

  5. Magnitude of Construction Cost and Schedule Overruns in Public Work Projects

    Directory of Open Access Journals (Sweden)

    Pramen P. Shrestha

    2013-01-01

    Full Text Available This study analyzed 363 Clark County Department of Public Works (CCDPW projects to determine construction cost and schedule overruns in various types and sizes of the projects. The sample projects were constructed from 1991 to 2008, with a total construction cost of $1.85 billion, equivalent to 2012 cost. A one-factor ANOVA test was conducted to determine whether construction cost and schedule overruns significantly varied based on types and sizes of the projects. The study showed that large, long-duration projects had significantly higher cost and schedule overruns than smaller, short-duration projects.

  6. Magnitude of Construction Cost and Schedule Overruns in Public Work Projects

    OpenAIRE

    Pramen P. Shrestha; Burns, Leslie A.; Shields, David R.

    2013-01-01

    This study analyzed 363 Clark County Department of Public Works (CCDPW) projects to determine construction cost and schedule overruns in various types and sizes of the projects. The sample projects were constructed from 1991 to 2008, with a total construction cost of $1.85 billion, equivalent to 2012 cost. A one-factor ANOVA test was conducted to determine whether construction cost and schedule overruns significantly varied based on types and sizes of the projects. The study showed that lar...

  7. Flexible Work Schedules: What Are We Trading off To Get Them?

    Science.gov (United States)

    Golden, Lonnie

    2001-01-01

    Flexible work schedules have more than doubled since 1985, but workers sometimes must be willing to increase their hours, work evening shifts, or switch to part-time status, self-employment, or certain occupations to get flexibility. Flexibility was less likely for nonwhite, female, unmarried, and less-educated workers. (Contains 38 notes and…

  8. The effect of alternative work arrangements on women's well-being: a demand-control model.

    Science.gov (United States)

    Kelloway, E K; Gottlieb, B H

    1998-01-01

    The growth of women's participation in the labor force and evidence of the conflict they experience between job and family demands have spurred many employers to introduce alternative work arrangements such as flextime, job sharing, and telecommuting. Drawing on data gained from a sample of women (N = 998) in two large Canadian organizations, this study evaluates two mediational models of the impact of alternative work arrangements on women's stress and family role competence. Specifically, it tests and finds support for the hypotheses that (a) work arrangements involving scheduling flexibility (telecommuting and flextime) promote these aspects of women's well-being by increasing their perceived control over their time, and (b) arrangements involving reduced hours of employment (part-time employment and job sharing) promote well-being by reducing perceived job overload. Discussion of these findings centers on their implications for employed women, their employers, and future research.

  9. Work-family conflict and enrichment from the perspective of psychosocial resources: comparing Finnish healthcare workers by working schedules.

    Science.gov (United States)

    Mauno, Saija; Ruokolainen, Mervi; Kinnunen, Ulla

    2015-05-01

    We examined work-family conflict (WFC) and work-family enrichment (WFE) by comparing Finnish nurses, working dayshifts (non-shiftworkers, n = 874) and non-dayshifts. The non-dayshift employees worked either two different dayshifts (2-shiftworkers, n = 490) or three different shifts including nightshifts (3-shiftworkers, n = 270). Specifically, we investigated whether different resources, i.e. job control, managers' work-family support, co-workers' work-family support, control at home, personal coping strategies, and schedule satisfaction, predicted differently WFC and WFE in these three groups. Results showed that lower managers' work-family support predicted higher WFC only among 3-shiftworkers, whereas lower co-workers' support associated with increased WFC only in non-shiftworkers. In addition, shiftworkers reported higher WFC than non-shiftworkers. However, the level of WFE did not vary by schedule types. Moreover, the predictors of WFE varied only very little across schedule types. Shiftwork organizations should pay more attention to family-friendly management in order to reduce WFC among shiftworkers.

  10. Efficient Work Team Scheduling: Using Psychological Models of Knowledge Retention to Improve Code Writing Efficiency

    Directory of Open Access Journals (Sweden)

    Michael J. Pelosi

    2014-12-01

    Full Text Available Development teams and programmers must retain critical information about their work during work intervals and gaps in order to improve future performance when work resumes. Despite time lapses, project managers want to maximize coding efficiency and effectiveness. By developing a mathematically justified, practically useful, and computationally tractable quantitative and cognitive model of learning and memory retention, this study establishes calculations designed to maximize scheduling payoff and optimize developer efficiency and effectiveness.

  11. Anatomy of Alternating Quantifier Satisfiability (Work in progress)

    DEFF Research Database (Denmark)

    Dung, Phan Anh; Bjørner, Nikolaj; Monniaux, David

    We report on work in progress to generalize an algorithm recently introduced in [10] for checking satisfiability of formulas with quantifier alternation. The algorithm uses two auxiliary procedures: a procedure for producing a candidate formula for quantifier elimination and a procedure for elimi...

  12. Filling the Holes: Work Schedulers as Job Crafters of Employment Practice in Long-Term Health Care.

    Science.gov (United States)

    Kossek, Ellen Ernst; Piszczek, Matthew M; Mcalpine, Kristie L; Hammer, Leslie B; Burke, Lisa

    2016-08-01

    Although work schedulers serve an organizational role influencing decisions about balancing conflicting stakeholder interests over schedules and staffing, scheduling has primarily been described as an objective activity or individual job characteristic. The authors use the lens of job crafting to examine how schedulers in 26 health care facilities enact their roles as they "fill holes" to schedule workers. Qualitative analysis of interview data suggests that schedulers expand their formal scope and influence to meet their interpretations of how to manage stakeholders (employers, workers, and patients). The authors analyze variations in the extent of job crafting (cognitive, physical, relational) to broaden role repertoires. They find evidence that some schedulers engage in rule-bound interpretation to avoid role expansion. They also identify four types of schedulers: enforcers, patient-focused schedulers, employee-focused schedulers, and balancers. The article adds to the job-crafting literature by showing that job crafting is conducted not only to create meaningful work but also to manage conflicting demands and to mediate among the competing labor interests of workers, clients, and employers.

  13. Filling the Holes: Work Schedulers as Job Crafters of Employment Practice in Long-Term Health Care

    Science.gov (United States)

    Kossek, Ellen Ernst; Piszczek, Matthew M.; Mcalpine, Kristie L.; Hammer, Leslie B.; Burke, Lisa

    2016-01-01

    Although work schedulers serve an organizational role influencing decisions about balancing conflicting stakeholder interests over schedules and staffing, scheduling has primarily been described as an objective activity or individual job characteristic. The authors use the lens of job crafting to examine how schedulers in 26 health care facilities enact their roles as they “fill holes” to schedule workers. Qualitative analysis of interview data suggests that schedulers expand their formal scope and influence to meet their interpretations of how to manage stakeholders (employers, workers, and patients). The authors analyze variations in the extent of job crafting (cognitive, physical, relational) to broaden role repertoires. They find evidence that some schedulers engage in rule-bound interpretation to avoid role expansion. They also identify four types of schedulers: enforcers, patient-focused schedulers, employee-focused schedulers, and balancers. The article adds to the job-crafting literature by showing that job crafting is conducted not only to create meaningful work but also to manage conflicting demands and to mediate among the competing labor interests of workers, clients, and employers.

  14. Work schedule influence on sleep habits in elementary and high school teachers according to chronotype

    Directory of Open Access Journals (Sweden)

    Jane Carla de Souza

    2014-09-01

    Full Text Available The influence of work schedule on sleep habits and quality, and daytime sleepiness according to individual preferences in sleep schedules was assessed in 131 elementary and high school teachers through questionnaires. Teachers who initiate classes around 7:00 hr wake up earlier and show more frequency of poor sleep quality than those who start classes in the afternoon. Between them, those who have a preference for intermediate or later hours for sleep are more irregular in their wake up schedules and increase their sleep duration on the weekend compared to those with earlier sleep preferences. On the other hand, working only in the afternoon seems to provide better sleep/awake conditions for teachers, because they keep the same sleep duration during the week and on the weekend, and they are diagnosed with less daytime sleepiness. Therefore, the discussion of school start times, originally proposed for adolescents, needs to be magnified to teachers, contributing to improvement of sleep habits and life quality in school environments.

  15. The Motherhood Wage Penalty Revisited: Experience, Heterogeneity, Work Effort, and Work-Schedule Flexibility.

    Science.gov (United States)

    Anderson, Deborah J.; Binder, Melissa; Krause, Kate

    2003-01-01

    Controlling for human capital inputs and unobserved heterogeneity explained 55-57% of the wage gap between mothers and nonmothers. Mothers faced the highest wage penalty at return to work. High school graduates suffered more prolonged, severe losses than women with lower or higher attainment. Their jobs were less likely to offer flexibility needed…

  16. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    the predominant scheduling method since it was introduced in the late 1950s. Over the years, CPM has proven to be a very powerful technique for planning, scheduling and controlling projects, which among other things is indicated by the development of a large number of CPM-based software applications available...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  17. Optimization for vehicle scheduling in iron and steel works based on semi-trailer swap transport

    Institute of Scientific and Technical Information of China (English)

    CHENG Yao-rong; LIANG Bo; ZHOU Mei-hua

    2010-01-01

    In order to solve internal logistics problems of iron and steel works,such as low transportation efficiency of cehicles and high transportation cost,the production process and traditional transportation style of iron and steel work were introduced.The internal transport tasks of iron and steel works were grouped based on cluster analysis according to demand time of the transportation. An improved vehicle scheduling model of semi-trailer swap transport among loading nodes and unloading nodes in one task group was set up.The algorithm was designed to silve the vehicle routing problem with simultaneous pick-up and delivery (CRPSPD)problem based on semi-trailer swap transport.A solving program was written by MATLAB software and the method to figure out the optimal path of each grouping was obtainde.The dropping and pulling transportation plan of the tractor wan designed.And an decerase the numbers of semi-trailer swap transport in iron and steel works was given.The results indicate that semi-trailer swap transport can steel works,and the total distance traveled reduces by 43.5%.The semi-trailer swap transport can help the iron and steel works develop the productiong in intension.

  18. Control over the Scheduling of Simulated Office Work Reduces the Impact of Workload on Mental Fatigue and Task Performance

    Science.gov (United States)

    Hockey, G. Robert J.; Earle, Fiona

    2006-01-01

    Two experiments tested the hypothesis that task-induced mental fatigue is moderated by control over work scheduling. Participants worked for 2 hr on simulated office work, with control manipulated by a yoking procedure. Matched participants were assigned to conditions of either high control (HC) or low control (LC). HC participants decided their…

  19. With 1,670 Students--Student Self-Scheduling Works Well for Us

    Science.gov (United States)

    Wall, F. Edward

    1976-01-01

    Chesterton High School, which has used both computer scheduling and student self-scheduling, finds the latter method produces the most satisfactory results. In response to Richard Tilwick's article in the November 1975 Bulletin (Student Self-Scheduling: An Unintentional Deception), F. Edward Wall explains why his students and teachers favor…

  20. 10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.

    Science.gov (United States)

    2010-01-01

    .... 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate... annually for State government fleets, including agencies thereof but excluding municipal fleets,...

  1. Diving pattern and work schedule of construction well divers in Taiwan.

    Science.gov (United States)

    Huang, K L; Lee, H C; Huang, G B; Lin, T F; Niu, K C; Liou, S H; Lin, Y C

    1998-01-01

    Construction well divers in Taiwan reportedly suffer a high prevalence of dysbaric osteonecrosis. We studied five divers working at the same construction site. We recorded their diving methods, diving depths, bottom times, work patterns, water temperatures, and heart rates. We also monitored gas bubbles in the subclavian vein in selected dives. A crude but effective hot-water system protected divers against hypothermia and allowed them to work in 24 degrees-27 degrees C water. Divers worked approximately 6.6 h a day and progressed approximately 3.0 m a day while excavating an average of 148 buckets of sand and rock each weighing 49.5 kg. The divers sustained a heart rate increase of 49%. Sixty percent of their equivalent single dive bottom times exceeded the U.S. Navy's no-decompression limits. Two cases of venous bubbles were detected, and one of these divers showed symptoms of decompression sickness. The prolonged bottom time and lack of a decompression schedule probably contributed to a risk of decompression sickness and dysbaric osteonecrosis.

  2. Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

    Science.gov (United States)

    Drummond, Mark; Fox, Mark; Tate, Austin; Zweben, Monte

    1992-01-01

    The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

  3. Shiftworking families: parents' working schedule and sleep patterns of adolescents attending school in two shifts

    Directory of Open Access Journals (Sweden)

    Biserka Radoševic-Vidacek

    2004-12-01

    Full Text Available OBJECTIVE: To explore whether parents' engagement in shift work affects the sleep habits of their adolescent children who attend school in two shifts. METHODS: The data were drawn from an extensive survey of sleep and daytime functioning of adolescents attending school one week in the morning and the other in the afternoon. The participants were 1,386 elementary and high school students (11-18 years old whose parents were both employed. The data were analyzed using MANOVA, with parents' work schedule, adolescents' gender and type of school as between-subject factors. RESULTS: Parents' working schedule significantly affected the sleep patterns of high school adolescents. When attending school in the morning, adolescents whose parents were both day workers woke up somewhat later than adolescents with one shiftworking parent. In addition, they slept longer than adolescents whose parents were both shift workers. On weekends, adolescents whose parents both worked during the day went to bed earlier than adolescents whose parents were both shiftworkers. They also had smaller bedtime delay on weekends with respect to both morning and afternoon shifts than adolescents for whom one or both parents worked shifts. A significant interaction between parents' working schedule, adolescents' gender and type of school was found for sleep extension on weekends after afternoon shift school. CONCLUSIONS: Parental involvement in shift work has negative effects on the sleep of high school adolescents. It contributes to earlier wake-up time and shorter sleep in a week when adolescents attend school in the morning, as well as to greater bedtime irregularity.OBJETIVO: Investigar se a ocupação de pais com o trabalho em turnos interfere nos hábitos de sono dos filhos adolescentes que freqüentam a escola em dois períodos distintos. MÉTODOS: Os dados foram coletados em uma extensa pesquisa sobre sono e atividades diurnas de adolescentes que freqüentavam a escola no

  4. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  5. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... for planning, scheduling and controlling projects. However, criticism has been raised on the CPM method, specifically in the case of construction projects, for deficient management of construction work and discontinuous flow of resources. Alternative scheduling techniques, often called repetitive or linear...... scheduling methods, have proven to be well suited for projects of a repetitive nature, such as building projects. As the repetitive or linear scheduling methods may include locations or places, they are also referred to by the comprehensive term of location-based scheduling (LBS), which is the concept...

  6. How To Create Alternative, Magnet, and Charter Schools That Work.

    Science.gov (United States)

    Barr, Robert D.; Parrett, William H.

    In the early 1970s, pessimism about public education in the United States was on the rise. To counter this outlook, researchers held a conference to identify public schools that were humane, caring, and effective, and from this conference arose a heightened awareness of alternative schools and their place in education. Subsequent years of…

  7. Personnel scheduling

    OpenAIRE

    Vanden Berghe, Greet

    2012-01-01

    Personnel scheduling can become a particularly difficult optimisation problem due to human factors. And yet: people working in healthcare, transportation and other round the clock service regimes perform their duties based on a schedule that was often manually constructed. The unrewarding manual scheduling task deserves more attention from the timetabling community so as to support computation of fair and good quality results. The present abstract touches upon a set of particular characterist...

  8. Optimizing Fire Department Operations Through Work Schedule Analysis, Alternative Staffing, and Nonproductive Time Reduction

    Science.gov (United States)

    2014-09-01

    calendar days provide opportunities for employee rest, recuperation, and leisure. Additionally, EDOs are evenly distributed among the employees...Pacifica—0% reduction in sick leave usage • Half Moon Bay—10% reduction in sick leave usage • Manhattan Beach—80% reduction is sick leave usage...and-file firefighters within the DFD are considered interchangeable during the planning and implementation phases of new policy rollouts. Alone, a

  9. Collaborative Work as an Alternative for Writing Research Articles

    Directory of Open Access Journals (Sweden)

    Nancy Emilce Carvajal Medina

    2014-04-01

    Full Text Available Academic writing in English in our context is a significant aspect that can be innovative when a convergence model of writing stages is used along with collaborative work. This article reports on a study aimed at analyzing how collaborative work relates to undergraduate electronics students’ academic writing development in English as a foreign language at a Colombian university, following some specific writing stages. Field notes, students’ artifacts, and semi-structured interviews were the instruments used to gather information. The results showed that writing is achievable if students can follow stages and receive feedback from the teacher. Additionally, collaborative work allowed students to write research articles in an easy and dynamic way.

  10. Jobs, Income, and Work: Ruinous Trends, Urgent Alternatives.

    Science.gov (United States)

    Sklar, Holly

    This book examines recent trends in the areas of jobs, income, and work. Among the trends discussed are the following: upward redistribution of wealth; persistent impoverishment; less disposable income; lower wages and higher education; union-free labor and increasing numbers of "disposable" workers; competition for global corporations…

  11. 77 FR 17457 - Work Group on Alternative Test Methods for Commercial Measuring Devices

    Science.gov (United States)

    2012-03-26

    ... National Institute of Standards and Technology Work Group on Alternative Test Methods for Commercial...: The National Institute of Standards and Technology (NIST) is forming a Work Group (WG) to examine alternative methods for testing the accuracy of commercial measuring devices including, but not limited...

  12. Numerical Studies On Bubble Pump With Alternate Working Fluids

    Directory of Open Access Journals (Sweden)

    L. Bruno Augustin

    2013-10-01

    Full Text Available The importance of energy conservation in the context of growing global population and dwindling fossil fuel resources cannot be overemphasized. Energy can be conserved by using it more efficiently. The energy spent for an application should be of the correct amount and type. It would make more sense to spend heat energy for heating rather than the high grade electricity as most of the electric power in the world is generated from driving heat engines, for which heat is supplied from the combustion of fossil fuels. At the same time, depletion of these conventional resources also poses a serious problem in meeting energy requirements. In this paper, the bubble pump, which is an integral part of diffusion- absorption refrigeration system, has been investigated numerically .A thermally driven bubble pump, which can be powered by solar thermal energy, is used to lift the liquid. The bubble pump runs on solar energy and reduces the amount of energy spent by replacing the compressor in conventional vapour absorption refrigeration system. As a result of the absence of any mechanical moving part, the refrigerator is silent and very reliable in addition to an economical and environmental friendly device. The concept of such a pump is already in existence but optimization studies are yet to be extensively investigated. This paper deals with the comparison of various parameters of the bubble pump using water and Nonane as the working fluid. Numerical simulation of the bubble pump is carried out using simple numerical equations which assume slug flow in the bubble pump. The mass flow rate, the sensible heating time and position of heating element are varied and the effect it has on diameter of the pipe, pumping ratio and the heat required is studied for both the working fluids

  13. Parental Involvement and Work Schedules: Time with Children in the United States, Germany, Norway, and the United Kingdom.

    Science.gov (United States)

    Hook, Jennifer L; Wolfe, Christina M

    2013-06-01

    We examine variation in parents' time with children by work schedule in two-parent families, utilizing time use surveys from the United States (2003), Germany (2001), Norway (2000), and the United Kingdom (2000) (N = 6,835). We find that American fathers working the evening shift spend more time alone with children regardless of mothers' employment status, whereas this association is conditional on mothers' employment in the United Kingdom and Germany. We find no evidence that Norwegian fathers working the evening shift spend more time alone with children. We conclude that a consequence of evening work often viewed as positive for children - fathers spending more time with children - is sensitive to both household employment arrangements and country context.

  14. Schedule Control, Supervisor Support and Work Engagement: A Winning Combination for Workers in Hourly Jobs?

    Science.gov (United States)

    Swanberg, Jennifer E.; McKechnie, Sharon P.; Ojha, Mamta U.; James, Jacquelyn B.

    2011-01-01

    The changing natures of both work and the lives of the U.S. workforce have created an array of challenges for organizations attempting to foster work engagement. To accommodate the work and family needs of an increasingly diverse workforce, many firms are offering flexible work solutions to employees. However, the distribution of these types of…

  15. Decommissioning Programme Management: reducing risk and cost while accelerating schedules through improved planning, Earned Value Management and safe work execution

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, S.E. [CH2M Hill International Nuclear Services (United States)

    2008-07-01

    CH2M HILL experience includes more than two decades of managing nuclear facilities and providing clean-up and operations support for commercial and government facilities worldwide. Our expertise ranges from decommissioning and defence sector businesses to nuclear technology development and innovation. Our approach places top priority on the safe execution of work while reducing both risk and cost. Our nuclear services include: programme management, nuclear safety analysis, radiological protection, radioactive waste management, nuclear remediation, nuclear materials and waste transportation management, nuclear safeguards and security services, and nuclear decontamination and decommissioning. This paper will discuss our approach which has resulted in a strong track record of accelerating schedules and reducing costs of major nuclear programmes, including Rocky Flats, Idaho, and our work at UKAEA sites. (author)

  16. Beating Time/Making Time: The Impact of Work Scheduling on Men's Family Roles.

    Science.gov (United States)

    Hood, Jane; Golden, Susan

    1979-01-01

    Case studies examine men's family situations. Attempts to beat time by working from noon to midnight result in unintended negative consequences for one family. For another, creation of a split-shift family when a wife returns to work brings a father closer to his children and wife. (Author)

  17. Non-standard work schedules and childbearing in the Netherlands: a mixed-method couple analysis

    NARCIS (Netherlands)

    K. Begall; M. Mills; H.B.G. Ganzeboom

    2014-01-01

    This study examined the effect of working at non-standard times on the transition to first and second childbirth. Using quantitative couple data from two waves of the Netherlands Kinship Panel Study (N = 742) and semi-structured qualitative interviews (N = 29), we found a lower probability of having

  18. Psychosocial aspects of work and health in the North Sea oil and gas industry. Pt. 5: offshore work/leave schedules: data analyses and review

    Energy Technology Data Exchange (ETDEWEB)

    Parkes, K.R.; Clark, M.J.

    1997-09-01

    The work described in this report draws on a variety of sources to examine the psychosocial implications of three-week offshore tours as compared with the more usual two-week tour duration. Little of the information currently available about the psychosocial environment offshore, and the mental and physical health of offshore employees, relates to personnel working three-week tours. The present study, intended as a preliminary exploration of responses to three-week offshore schedules, brings together the several different kinds of information. The report includes: A brief review of relevant literature; a comparison of different work/leave patterns in terms of the attitudes and preferences of offshore personnel (N=1462); Analysis of questionnaire data evaluating the reactions of offshore personnel (N=113) to plans to change from two-week to three-week tours; A pilot study of mood and sleep patterns among personnel working either a two-week or a three-week tour at the time of data collection; material from interviews with wives of offshore personnel, focusing on family issues associated with offshore employment, including work/leave cycles. (UK)

  19. A Quantitative Analysis of Response Elimination and Resurgence Using Rich, Lean, and Thinning Schedules of Alternative Reinforcement

    OpenAIRE

    Sweeney, Mary M.

    2012-01-01

    A common approach to the treatment of instrumental problem behavior is the introduction of an acceptable alternative source of reinforcement. However, when alternative reinforcement is removed or reduced, the target behavior tends to relapse. The relapse of a target response following the removal of alternative reinforcement has been termed resurgence. Shahan and Sweeney developed a quantitative model of resurgence based on behavioral momentum theory that captures both the disruptive and stre...

  20. A bio-economic approach to analyze the role of alternative seeding-harvesting schedules, water quality, stocking density and duration of cultivation in semi-intensive production of shrimp in Mexico

    Directory of Open Access Journals (Sweden)

    Margarita Estrada-Pérez

    2015-07-01

    Full Text Available We used a bio-economic model to analyze the role that alternative seeding-harvesting schedules, temperature, dissolved oxygen, stocking density, and duration of cultivation play in the economic performance of semi-intensive shrimp cultivation in Mexico. The highest production was predicted for the May-August schedule (1130-2300 kg ha-1, while the lowest yields were obtained for the March-June schedule (949-1300 kg ha-1. The highest net revenues were projected for the August-November schedule (US$354-1444 ha-1, while the lowest was projected for the May-August schedule (US$330-923 ha-1. The highest annual net revenues were predicted for the combination of the March-June and August-November schedules (US$1432-2562 ha-1. Sensitivity analysis indicated temperature and dissolved oxygen were the most important factors determining net revenues in March-June schedule. For the May-August and August-November schedules, stocking density was the most important factor. Duration of cultivation was the least sensitive variable. Break-even production analysis confirmed that the combination of the March-June and August-November schedules were more efficient from an economic perspective. We recommend test some ponds with higher stocking density in the March-June and August-November schedules, and in the latter case, seeding in June or July rather than August.

  1. Consider the OIG Work Plan in your 2012 internal audit schedules.

    Science.gov (United States)

    Schaum, Kathleen D

    2011-12-01

    Wound care professionals should conduct monthly internal audits of their business processes. In addition to auditing, the coding, payment, and coverage issues that are considered issues by the Medicare contractor that processes your claims and the Medicare contractors that audit your claims and payments, be sure to include the OIG Work Plan topics that pertain to your wound care business. Remember, if atopic is important enough to make the OIG Work Plan, it should be important enough to make your 2012 internal audit plan. Because the Medicare Trust Fund is important to all US citizens, everyone has a responsibility to assist in combating fraud, waste, abuse, and mismanagement in HHS programs. Therefore, the OIG Hotline accepts tips from all sources. To provide a tip to the OIG Hotline, see Table 1 for contact information.

  2. School Construction Scheduling.

    Science.gov (United States)

    Delaney, J. B.

    1983-01-01

    Explains that favorable market and working conditions influence the scheduling of school construction projects. Facility planners, architects, and contractors are advised to develop a realistic time schedule for the entire project. (MLF)

  3. 48 CFR 53.301-1093 - Standard Form 1093, Schedule of Withholdings Under the Davis-Bacon Act and/or the Contract Work...

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Standard Form 1093, Schedule of Withholdings Under the Davis-Bacon Act and/or the Contract Work Hours and Safety Standards Act... Withholdings Under the Davis-Bacon Act and/or the Contract Work Hours and Safety Standards Act. EC01MY91.076...

  4. Working Nonstandard Schedules and Variable Shifts in Low-Income Families: Associations with Parental Psychological Well-Being, Family Functioning, and Child Well-Being

    Science.gov (United States)

    Hsueh, JoAnn; Yoshikawa, Hirokazu

    2007-01-01

    Longitudinal data from the New Hope Project--an experimental evaluation of a work-based antipoverty program in Milwaukee, Wisconsin--was used to explore concurrent and lagged associations of nonstandard schedules and variable shifts with parental psychological well-being, regularity of family mealtimes, and child well-being among low-income…

  5. Association of Sleep Duration, Sleep Quality and Shift-Work Schedule in Relation to Hypertension Prevalence in Chinese Adult Males: A Cross-Sectional Survey

    Science.gov (United States)

    Lu, Kai; Chen, Jia; Wang, Li; Wang, Changying; Ding, Rongjing; Wu, Shouling; Hu, Dayi

    2017-01-01

    Background: Previous studies indicated that measurement of sleep only by duration and quality may be biased. This study aimed to investigate the interactive association of self-reported sleep duration, quality and shift-work schedule with hypertension prevalence in Chinese adult males. Methods: A total of 4519 Chinese adult males (≥18 years) were enrolled into the cross-sectional survey. Sleep attributes were measured from the responses to the standard Pittsburgh Sleep Quality Index and relevant questions in a structured questionnaire survey. The association of sleep duration, quality and shift-work schedule with hypertension prevalence was analyzed using multivariate logistic regression, considering the interaction between them or not. Results: Taking the potential interaction of the three aspects of sleep into consideration, only short sleep duration combined with poor sleep quality was found to be related to hypertension prevalence in Chinese adult males (odds ratio (OR): 1.74, 95% confidence interval (CI): 1.31–2.31), which could be modified by occasional and frequent shift-work schedule (OR: 1.43, 95% CI: 1.05–1.95; OR: 1.97, 95% CI: 1.40–2.79). Conclusions: Short sleep duration was not associated with the prevalence of hypertension in Chinese adult males unless poor sleep quality exists, which could be further modified by shift-work schedule. Assessment of sleep by measuring sleep duration only was not sufficient when exploring the association of sleep with hypertension. PMID:28230809

  6. Twelve-hour brain lithium concentration in lithium maintenance treatment of manic-depressive disorder: daily versus alternate-day dosing schedule

    DEFF Research Database (Denmark)

    Jensen, H.V.; Plenge, P; Stensgaard, A

    1996-01-01

    The 12-h brain lithium concentration was measured by lithium-7 magnetic resonance spectroscopy in ten manic-depressive patients receiving daily or alternate-day lithium carbonate treatment. The median dose of lithium carbonate was 800 mg in the daily treatment group and 1200 mg in the alternate......-day group. Median 12-h serum lithium concentration in the two groups was 0.86 mmol l-1 and 0.55 mmol l-1, respectively, while the corresponding concentration in brain was 0.67 mmol l-1 and 0.52 mmol l-1, respectively. The 12-h brain lithium concentration was independent of lithium dosing schedule (multiple...... linear regression), but correlated significantly with the 12-h serum lithium concentration (P = 0.003; B = 0.53, 95% c.l. 0.24-0.82; beta = 0.83). Thus at identical 12-h serum lithium concentrations the 12-h brain lithium concentration is similar with both treatment regimes. As the risk of manic...

  7. Dosing Schedules for Pneumococcal Conjugate Vaccine

    Science.gov (United States)

    2014-01-01

    Since second generation pneumococcal conjugate vaccines (PCVs) targeting 10 and 13 serotypes became available in 2010, the number of national policy makers considering these vaccines has steadily increased. An important consideration for a national immunization program is the timing and number of doses—the schedule—that will best prevent disease in the population. Data on disease epidemiology and the efficacy or effectiveness of PCV schedules are typically considered when choosing a schedule. Practical concerns, such as the existing vaccine schedule, and vaccine program performance are also important. In low-income countries, pneumococcal disease and deaths typically peak well before the end of the first year of life, making a schedule that provides PCV doses early in life (eg, a 6-, 10- and 14-week schedule) potentially the best option. In other settings, a schedule including a booster dose may address disease that peaks in the second year of life or may be seen to enhance a schedule already in place. A large and growing body of evidence from immunogenicity studies, as well as clinical trials and observational studies of carriage, pneumonia and invasive disease, has been systematically reviewed; these data indicate that schedules of 3 or 4 doses all work well, and that the differences between these regimens are subtle, especially in a mature program in which coverage is high and indirect (herd) effects help enhance protection provided directly by a vaccine schedule. The recent World Health Organization policy statement on PCVs endorsed a schedule of 3 primary doses without a booster or, as a new alternative, 2 primary doses with a booster dose. While 1 schedule may be preferred in a particular setting based on local epidemiology or practical considerations, achieving high coverage with 3 doses is likely more important than the specific timing of doses. PMID:24336059

  8. SURVEYS ON THE EXPECTATIONS AND ALTERNATIVES FOR THE FUTURE OF THE EXECUTIVE WORK

    Directory of Open Access Journals (Sweden)

    Daniela Degani

    2012-06-01

    Full Text Available Many cultural and behavioral changes have occurred in society in recent years, but with little consequence in the corporate labor relations. Despite the great technological evolution, we work mostly in the same way as a century ago. This study conducts surveys about the expectations and alternatives for the future of executive work and aims to assess the benefits and prerequisites for the adoption of differentiated working relationships to reconcile the interests of professionals, organizations and society. The methods used were a quantitative survey with executives and in-depth interviews with experts. The main conclusions were that the executive work will undergo profound changes in the near future, being the main difference the flexibility of times and places to work, creating greater autonomy and demanding from professionals and companies a new level of motivation, discipline, communication skills where there is no physical presence, clarity of purpose and values. This transformation will be gradual and the companies that come forward in the adoption of processes and competences that support differentiated relationships will gain competitive advantage.

  9. An educational alternative for improving working conditions in small and medium enterprises

    Directory of Open Access Journals (Sweden)

    Eliana Castro S

    2011-11-01

    Full Text Available Managing health and safety at work involves considering two internal processes common to all organizations: knowledge and human talent management. These two processes are affected by globalizing phenomena that have an effect at the economic, environmental, and occupational levels. This is especially true for countries like Colombia. Objective: to provide an educational alternative that contributes to knowledge management in SME’s in order to improve the working conditions and to support their innovation processes. Methodology: an exploratory and descriptive study. We start by analyzing the concepts related to the improvement of working conditions and experiences from previous projects involving the university-industry relationship. This is done from the systemic viewpoint that characterizes the ergonomics and interdisciplinary perspectives of the professional practice of industrial design. Result: the proposal was approved by regional institutions wishing to conduct a pilot study, and is based on principles establishing health promotion at the workplace. It also includes a methodology for affecting the technological core of companies and contributes to the empowerment of the personnel involved. Conclusion:it is mandatory that organizations express their support and commitment through a policy that facilitates the active participation of employees in these processes.

  10. Psychosocial aspects of work and health in the North Sea oil and gas industry. Pt. 3: Sleep, mood, and performance in relation to offshore shift rotation schedules. Pt. 4: The offshore environment in the mid-1990s: a survey of psychosocial factors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This report describes a study of offshore shift rotation patterns, the aim of which was to compare fixed-shift and rollover schedules in terms of sleep, mood, and cognitive performance. Two rollover patterns, night followed by days (7N + 7D) and days followed by nights (7D + 7N), and one fixed-shift pattern in which day and night shifts were worked on alternate tours (14D + 14N), were studied. Data were collected on four North Sea oil and gas platforms. For analysis purposes, the two-week work cycle was divided into three test phases, each covering three consecutive shifts. Prior to the first two phases, ``practice`` shifts (during which data were collected but not analysed) were scheduled, and phases were separated by one or two ``rest`` shifts (during which no data were collected). Assessments were carried out at the start, middle, and end of each test shift. (author)

  11. The Twenty-four Hour Workday: Proceedings of a Symposium on Variations in Work-Sleep Schedules

    Science.gov (United States)

    1980-10-01

    Md. Tray.: 1971, _j 393-395. .ndlauer,P., Carpentier,J., & Cazamian,P. (Eds.). Ergonomie du travail de nuit et des horaires alternants. Education...and between subjects and suggest that Gaillard’s conclusion may not -be true. 743 REM 0) 2 {3 i4 40[ REM E 0L ɘ U 730-Delta Hour !Igure :2. Comuter

  12. Does type of hospital ownership influence physicians' daily work schedules? An observational real-time study in German hospital departments

    Directory of Open Access Journals (Sweden)

    Schöffel Norman

    2009-05-01

    Full Text Available Abstract Background During the last two decades the German hospital sector has been engaged in a constant process of transformation. One obvious sign of this is the growing amount of hospital privatization. To date, most research studies have focused on the effects of privatization regarding financial outcomes and quality of care, leaving important organizational issues unexplored. Yet little attention has been devoted to the effects of privatization on physicians' working routines. The aim of this observational real-time study is to deliver exact data about physicians' work at hospitals of different ownership. By analysing working hours, further impacts of hospital privatization can be assessed and areas of improvement identified. Methods Observations were made by shadowing 100 physicians working in private, for-profit or non-profit as well as public hospital departments individually during whole weekday shifts in urban German settings. A total of 300 days of observations were conducted. All working activities were recorded, accurate to the second, by using a mobile personal computer. Results Results have shown significant differences in physicians' working activities, depending on hospital ownership, concerning working hours and time spent on direct and indirect patient care. Conclusion This is the first real-time analysis on differences in work activities depending on hospital ownership. The study provides an objective insight into physicians' daily work routines at hospitals of different ownership, with additional information on effects of hospital privatization.

  13. Does type of hospital ownership influence physicians' daily work schedules? An observational real-time study in German hospital departments

    Science.gov (United States)

    Mache, Stefanie; Scutaru, Cristian; Vitzthum, Karin; Quarcoo, David; Schöffel, Norman; Welte, Tobias; Klapp, Burghard F; Groneberg, David A

    2009-01-01

    Background During the last two decades the German hospital sector has been engaged in a constant process of transformation. One obvious sign of this is the growing amount of hospital privatization. To date, most research studies have focused on the effects of privatization regarding financial outcomes and quality of care, leaving important organizational issues unexplored. Yet little attention has been devoted to the effects of privatization on physicians' working routines. The aim of this observational real-time study is to deliver exact data about physicians' work at hospitals of different ownership. By analysing working hours, further impacts of hospital privatization can be assessed and areas of improvement identified. Methods Observations were made by shadowing 100 physicians working in private, for-profit or non-profit as well as public hospital departments individually during whole weekday shifts in urban German settings. A total of 300 days of observations were conducted. All working activities were recorded, accurate to the second, by using a mobile personal computer. Results Results have shown significant differences in physicians' working activities, depending on hospital ownership, concerning working hours and time spent on direct and indirect patient care. Conclusion This is the first real-time analysis on differences in work activities depending on hospital ownership. The study provides an objective insight into physicians' daily work routines at hospitals of different ownership, with additional information on effects of hospital privatization. PMID:19473487

  14. 76 FR 32409 - Medicare Program; Five-Year Review of Work Relative Value Units Under the Physician Fee Schedule

    Science.gov (United States)

    2011-06-06

    ... Medicine and Rehabilitation AATS American Association for Thoracic Surgery ACC American College of... ICU Intensive care unit IDTF Independent diagnostic testing facility IWPUT Intra-service work per...

  15. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 11: PEP, cost, schedules, and work breakdown structure dictionary

    Science.gov (United States)

    1979-01-01

    Cost scheduling and funding data are presented for the reference design of the power extension package. Major schedule milestones are correlated with current Spacelab flight dates. Funding distributions provide for minimum expenditure during the first year of the project.

  16. Distributed scheduling

    OpenAIRE

    Toptal, Ayşegül

    1999-01-01

    Ankara : Department of Industrial Engineering and the Institute of Engineering and Science of Bilkent Univ., 1999. Thesis (Master's) -- Bilkent University, 1999. Includes bibliographical references. Distributed Scheduling (DS) is a new paradigm that enables the local decisionmakers make their own schedules by considering local objectives and constraints within the boundaries and the overall objective of the whole system. Local schedules from different parts of the system are...

  17. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  18. Scheduling Supercomputers.

    Science.gov (United States)

    1983-02-01

    no task is scheduled with overlap. Let numpi be the total number of preemptions and idle slots of size at most to that are introduced. We see that if...no usable block remains on Qm-*, then numpi < m-k. Otherwise, numpi ! m-k-1. If j>n when this procedure terminates, then all tasks have been scheduled

  19. Turbo-alternator-compressor design for supercritical high density working fluids

    Science.gov (United States)

    Wright, Steven A.; Fuller, Robert L.

    2013-03-19

    Techniques for generating power are provided. Such techniques involve a thermodynamic system including a housing, a turbine positioned in a turbine cavity of the housing, a compressor positioned in a compressor cavity of the housing, and an alternator positioned in a rotor cavity between the turbine and compressor cavities. The compressor has a high-pressure face facing an inlet of the compressor cavity and a low-pressure face on an opposite side thereof. The alternator has a rotor shaft operatively connected to the turbine and compressor, and is supported in the housing by bearings. Ridges extending from the low-pressure face of the compressor may be provided for balancing thrust across the compressor. Seals may be positioned about the alternator for selectively leaking fluid into the rotor cavity to reduce the temperature therein.

  20. Specific schedule conditions for the formation of personnel of A or B category working in nuclear facilities. Option research center

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This document describes the specific dispositions relative to the Research Center, for the formation to the conventional and radiation risks prevention of personnel of A or B category working in nuclear facilities. The application domain, the applicable documents, the liability, the specificity of the Research Center and of the retraining, the Passerelle formation, are presented. (A.L.B.)

  1. Specific schedule conditions for the formation of personnel of A or B category working in nuclear facilities. Option nuclear reactor

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This document describes the specific dispositions relative to the nuclear reactor domain, for the formation to the conventional and radiation risks prevention of personnel of A or B category working in nuclear facilities. The application domain, the applicable documents, the liability, the specificity of the nuclear reactor and of the retraining, the Passerelle formation, are presented. (A.L.B.)

  2. Flexibility of oral cholera vaccine dosing-a randomized controlled trial measuring immune responses following alternative vaccination schedules in a cholera hyper-endemic zone.

    Directory of Open Access Journals (Sweden)

    Suman Kanungo

    2015-03-01

    Full Text Available BACKGROUND: A bivalent killed whole cell oral cholera vaccine has been found to be safe and efficacious for five years in the cholera endemic setting of Kolkata, India, when given in a two dose schedule, two weeks apart. A randomized controlled trial revealed that the immune response was not significantly increased following the second dose compared to that after the first dose. We aimed to evaluate the impact of an extended four week dosing schedule on vibriocidal response. METHODOLOGY/PRINCIPAL FINDINGS: In this double blind randomized controlled non-inferiority trial, 356 Indian, non-pregnant residents aged 1 year or older were randomized to receive two doses of oral cholera vaccine at 14 and 28 day intervals. We compared vibriocidal immune responses between these schedules. Among adults, no significant differences were noted when comparing the rates of seroconversion for V. cholerae O1 Inaba following two dose regimens administered at a 14 day interval (55% vs the 28 day interval (58%. Similarly, no differences in seroconversion were demonstrated in children comparing the 14 (80% and 28 day intervals (77%. Following 14 and 28 day dosing intervals, vibriocidal response rates against V. cholerae O1 Ogawa were 45% and 49% in adults and 73% and 72% in children respectively. Responses were lower for V. cholerae O139, but similar between dosing schedules for adults (20%, 20% and children (28%, 20%. CONCLUSIONS/SIGNIFICANCE: Comparable immune responses and safety profiles between the two dosing schedules support the option for increased flexibility of current OCV dosing. Further operational research using a longer dosing regimen will provide answers to improve implementation and delivery of cholera vaccination in endemic and epidemic outbreak scenarios.

  3. "Always work with a straight back": the fallacies of modern management and the alternative

    DEFF Research Database (Denmark)

    Petersen, Verner C.

    2005-01-01

    in mind-less and care-less behaviour by employees, while an alternative relying on self-organisation and value-based leadership might preserve and enhance insight, motivation and responsibility. Research limitations/implications - The paper is mainly a conceptual discussion using examples. Practical......Purpose - The purpose of this article is to show that the tools of modern management which are supposed to promote effectiveness, efficiency and responsible behaviour, may in fact contribute to the opposite, and to present the outline of an alternative based upon new ideas of self...

  4. New Ways of Working and Organization: Alternative Agrifood Movements and Agrifood Researchers

    Science.gov (United States)

    Friedland, William H.

    2010-01-01

    The remarkable growth of alternative agrifood movements--organics, fair trade, localism, Slow Food, farmers' markets, community-supported agriculture, food security, food safety, food sovereignty, anti-genetically modified organisms, animal welfare, and others--and their attraction to younger academic scholars offer a unique opportunity to explore…

  5. Assessing Life Skills in Young Working Adults--Part 1: The Development of an Alternative Instrument.

    Science.gov (United States)

    van der Wal, Rachel Jacoba; van der Wal, Ruurd

    2003-01-01

    A collage with pictorial and verbal stimuli to assess life skills of young workers was developed using a framework for alternative assessment and stimuli instruments. The instrument was evaluated using Bloom's taxonomy for the cognitive domain and Krathwohl et al.'s taxonomy for the affective domain. (Contains 16 references.) (SK)

  6. Symbolic Non-Violence in the Work of Teachers in Alternative Education Settings

    Science.gov (United States)

    Waters, Richard

    2017-01-01

    Patterns in analysis of research data on alternative education practices as well as on student and teacher experience in mainstream settings seem to support Pierre Bourdieu and Jean Claude Passeron's theory of symbolic violence. Data from teachers and students suggest that students from low socio-economic backgrounds often disengage from education…

  7. Myths or theories? Alternative beliefs about HIV and AIDS in South African working class communities.

    Science.gov (United States)

    Dickinson, David

    2013-09-01

    Despite three decades of public health promotion based on the scientific explanation of HIV/AIDS, alternative explanations of the disease continue to circulate. While these are seen as counter-productive to health education efforts, what is rarely analysed is their plurality and their tenacity. This article analyses the 'AIDS myths' collected by African HIV/AIDS workplace peer educators during an action research project. These beliefs about HIV/AIDS are organised, in this article, around core ideas that form the basis of 'folk' and 'lay theories' of HIV/AIDS. These constitute non-scientific explanations of HIV/AIDS, with folk theories drawing on bodies of knowledge that are independent of HIV/AIDS while lay theories are generated in response to the disease. A categorisation of alternative beliefs about HIV/AIDS is presented which comprises three folk theories - African traditional beliefs, Christian theology, and racial conspiracy - and three lay theories, all focused on avoiding HIV infection. Using this schema, the article describes how the plausibility of these alternative theories of HIV/AIDS lies not in their scientific validity, but in the robustness of the core idea at the heart of each folk or lay theory. Folk and lay theories of HIV/AIDS are also often highly palatable in that they provide hope and comfort in terms of prevention, cure, and the allocation of blame. This study argue that there is coherence and value to these alternative HIV/AIDS beliefs which should not be dismissed as ignorance, idle speculation or simple misunderstandings. A serious engagement with folk and lay theories of HIV/AIDS helps explain the continued circulation of alternative beliefs of HIV/AIDS and the slow uptake of behavioural change messages around the disease.

  8. 33 CFR 203.50 - Nonstructural alternatives to rehabilitation of flood control works.

    Science.gov (United States)

    2010-07-01

    ... rehabilitation of flood control works. 203.50 Section 203.50 Navigation and Navigable Waters CORPS OF ENGINEERS... DISASTER PROCEDURES Rehabilitation Assistance for Flood Control Works Damaged by Flood or Coastal Storm... of flood control works. (a) Authority. Under Public Law 84-99, the Chief of Engineers is...

  9. 77 FR 9882 - Arsenic Small Systems Compliance and Alternative Affordability Criteria Working Group; public...

    Science.gov (United States)

    2012-02-21

    ... Working Group; public meeting AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of public meeting. SUMMARY: EPA is holding an initial meeting of the Arsenic Small Systems Working Group to provide... Working Group composed of representatives from States, small publicly owned water systems, local...

  10. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable.

  11. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  12. Resource Minimization Job Scheduling

    Science.gov (United States)

    Chuzhoy, Julia; Codenotti, Paolo

    Given a set J of jobs, where each job j is associated with release date r j , deadline d j and processing time p j , our goal is to schedule all jobs using the minimum possible number of machines. Scheduling a job j requires selecting an interval of length p j between its release date and deadline, and assigning it to a machine, with the restriction that each machine executes at most one job at any given time. This is one of the basic settings in the resource-minimization job scheduling, and the classical randomized rounding technique of Raghavan and Thompson provides an O(logn/loglogn)-approximation for it. This result has been recently improved to an O(sqrt{log n})-approximation, and moreover an efficient algorithm for scheduling all jobs on O((OPT)^2) machines has been shown. We build on this prior work to obtain a constant factor approximation algorithm for the problem.

  13. Alternative Methodologies in Research Literature Review: Links between Clinical Work and MFT Effectiveness.

    Science.gov (United States)

    Addison, Shelia M.; Sandberg, Jonathan G.; Corby, Joy; Robila, Mihaela; Platt, Jason J.

    2002-01-01

    Reviews 15 years of clinical research in three family therapy (FT) journals that provide evidence for the effectiveness of marriage and family therapy. Considers designs that are being utilized in reports on the effectiveness of various models of FT. Makes connections between research and the everyday work of clinicians to make the work more…

  14. Alternative tools to mass production and human performance indicators in sheltered work centers of Valencian community (Spain

    Directory of Open Access Journals (Sweden)

    Juan A. Marin-Garcia

    2011-10-01

    Full Text Available Purpose: The most popular alternative systems to mass production at an academic level (lean manufacturing, agile manufacturing, flexible customization, mass customization... share many characteristics. Our article identifies an extensive set of alternative practices to mass production; analyzes the classification of practices in categories (Flow, TQM, TPM, Customer Relations, Supplier Relations and Human Resources Practices and analyzes the impact on several human performance indicators such as satisfaction, absenteeism, voluntary turnover, permanent contracts, knowledge, personal & social adjustment activities and integration of workers into ordinary companies. Design/methodology/approach: Survey in sheltered work centers. We use regression analysis in order to prove relations between explicative and criterion variables. Findings: The results of our research allow us to identify that human resource management and customer relationship practices have significant effects on job satisfaction, knowledge, integration into ordinary companies and personal and social adjustment. Research limitations/implications: Data came only from one industry; therefore the results would not be directly generalized to other contexts. Practical implications: Managers in Sheltered work centers can estimate the impact of the deployment of alternative tools to mass production. Originality/value: There are few papers relating lean manufacturing tools and human resources performance indicators. At the same time, there are very few research carried out in sheltered work centers context.

  15. Work and Rest Patterns and Psychomotor Vigilance Performance of Crewmemebers of the USS Jason Dunham: A Comparison of the 3/9 and 6/6 Watchstanding Schedules

    Science.gov (United States)

    2014-12-31

    schedule. This perspective, though, oversimplifies the problem of optimized shiftwork to a simple enumeration of the minimum number of people needed...J. C. (2013a). Fundamentals of Shiftwork Scheduling, 3rd Edition: Fixing Stupid . Miller, J. C. (2013b). Shiftwork: An annotated bibliography. 44

  16. An Analysis of Alternative Shore Activity Personnel Execution to Improve Productive Work

    Science.gov (United States)

    2014-06-01

    workplaces indicate the Navy’s desire to balance work and home life for its service members. Efficiency programs that have been tried in the past...In contrast to the hierarchy and market cultures, clan focuses on teamwork , employee involvement and corporate commitment to employees. Leaders can

  17. Alternate solutions for mine ventilation network to keep a pre-assigned fixed quantity in a working place

    Institute of Scientific and Technical Information of China (English)

    K A El-Nagdy; A M Shoaib

    2015-01-01

    In underground constructions, a good ventilation design not only delivers fresh air to establish good working environment, but also provides a scientific and reliable basis to prevent disasters. In emergency cases, unexpected closure of the main airways may occur, providing the workers with alternative airways is substantial. This is important not only to sustain personnel lives, but also to prevent the mine ventilation system from damage. In this research, alternate solutions were introduced in case of failure in the underground construction to keep a pre-assigned fixed quantity in a working place for mine ventilation network. Eight different collapse scenarios were proposed to study their effect on the air quantity distribution among the branches in the ventilation circuit. From these scenarios, it is found that providing a sufficient air quantity in the working places could be achieved through modification of the network topology and adjusting the values of the regulators pressure. It is also indicated that the distance between the collapse and working places has a great effect on the amount of air delivered to it. A reduction in the power consumption could be done by re-arrange the installed regulators and decreasing the number of nodes and branches inside the network. A relationship representing the effect of changing the network topology on the total network power consumption was deduced through regression analysis. It is found that the total network power is quadratic dependent on the number of regulators and number of branches while it is directly dependent on the regulator power.

  18. The Problem-Oriented Project Work (PPL) Alternative in Self-Diected Higher Education

    DEFF Research Database (Denmark)

    Andersen, Anders Siig; Heilesen, Simon

    2015-01-01

    ) a way of organizing undergraduate education into broad interdisciplinary programs; and (3) an interdisciplinary profile where double-major graduate programs allow students to design their own academic and professional profiles. The chapter first explains similarities and differences between PPL and some...... related concepts of SDL: problem-based learning (PBL), inquiry-based learning, and project learning. Secondly, it outlines the origins and development of Roskilde University and of PPL. Thirdly, it introduces and discusses the building blocks and workings of PPL: problem-orientation, interdisciplinarity...

  19. Why Doesn't The GRE or GPA Work in Selecting Graduate Students & What Alternatives Are There ?

    Science.gov (United States)

    Sedlacek, William

    2014-01-01

    The simplest response to the title of this paper is that the measures that are commonly employed in evaluating prospective graduate and professional students don’t work. That is, scores from the Graduate Record Examination (GRE) and prior grades (GPA) appear to have little validity in assessing postbaccalaureate student potential (Sternberg & Williams, 1997; Sedlacek, 1998, 2004; Bair & Haworth, 1999). Measurement problems such as restriction of range will discussed and the need to consider a multiverse statistical model presented. An alternative assessment system based on noncognitive variables will be presented and examples of its use with graduate and professional students discussed (Sedlacek, 2004, 2012, in press).

  20. Horizontal career changes as an alternative to premature exit from work.

    Science.gov (United States)

    Aleksandrowicz, Paula; Zieschang, Hanna; Bräunig, Dietmar; Jahn, Frauke

    2014-01-01

    Certain workplaces are called jobs with limited tenure. Due to physical or psychosocial risk factors, often coupled with qualification mismatches, workers cannot grow old in them. That may lead to premature exit into retirement, to a period of drawing a work incapacity pension or to a long spell of unemployment. A horizontal career change, which enables the worker to move on to a less burdening workplace while preserving social status, is a possible solution. The objective of the "Horizontal career change-a new job opportunity for older employees" project is to develop a model of career changes for workers employed in jobs with limited tenure and to implement it in the form of an information- and communication technology-based tool. Possible applications range from individual career planning, through institutionalized vocational reintegration, to personnel development in small and medium-sized enterprises.

  1. Instruction Scheduling Across Control Flow

    Directory of Open Access Journals (Sweden)

    Martin Charles Golumbic

    1993-01-01

    Full Text Available Instruction scheduling algorithms are used in compilers to reduce run-time delays for the compiled code by the reordering or transformation of program statements, usually at the intermediate language or assembly code level. Considerable research has been carried out on scheduling code within the scope of basic blocks, i.e., straight line sections of code, and very effective basic block schedulers are now included in most modern compilers and especially for pipeline processors. In previous work Golumbic and Rainis: IBM J. Res. Dev., Vol. 34, pp.93–97, 1990, we presented code replication techniques for scheduling beyond the scope of basic blocks that provide reasonable improvements of running time of the compiled code, but which still leaves room for further improvement. In this article we present a new method for scheduling beyond basic blocks called SHACOOF. This new technique takes advantage of a conventional, high quality basic block scheduler by first suppressing selected subsequences of instructions and then scheduling the modified sequence of instructions using the basic block scheduler. A candidate subsequence for suppression can be found by identifying a region of a program control flow graph, called an S-region, which has a unique entry and a unique exit and meets predetermined criteria. This enables scheduling of a sequence of instructions beyond basic block boundaries, with only minimal changes to an existing compiler, by identifying beneficial opportunities to cover delays that would otherwise have been beyond its scope.

  2. 新旧列车运行图交替期客车车底运用方案的编制%Passenger Train Stock Scheduling in Alternative Periods between the New Train Diagram and the Old One

    Institute of Scientific and Technical Information of China (English)

    吕苗苗; 倪少权

    2013-01-01

    以旧列车运行图中1列列车最多与新列车运行图中1列列车存在接续关系、新列车运行图中1列列车最多与旧列车运行图中1列列车存在接续关系、新列车运行图中所有列车必须有客车车底担当为约束条件,以新旧列车运行图交替期列车接续代价最小为目标函数,建立新旧列车运行图交替期客车车底运用方案优化模型,并设计基于蚁群算法的模型求解算法.以成都站执行新运行图时的数据(成都站为客车车底配属站)为例,采用本方法编制新旧列车运行图交替期客车车底运用方案,并与人工基于车底固定运用模式编制的方案对比,结果表明本方法编制的车底运用方案更优,验证了模型和算法的可行性和实用性.%One train in the old train diagram can connect no more than one train in the new train diagram,one train in the new train diagram can connect no more than one train in the old train diagram,and all trains in the new train diagram must be executed by passenger train stock.Taking those shown above as constraints,taking minimizing train connection costs in alternative periods as object function,the optimization model for passenger train stock scheduling in alternative periods is established.According to the characteristics of the model,the model solving algorithm is designed based on ant colony algorithm.Taking the data of Chengdu Station (Chengdu Station is the allocation station of passenger train stock) during the implementation of the new train diagram for example,passenger train stock scheduling in alternative periods is made by the method,and compared with man-made one which is based on the fixed scheduling mode of passenger train stock.Results show that the scheduling plan made by the proposed method is more optimized,and the feasibility and practicality of the model and algorithm are validated.

  3. Crafting a neo-Vygotskian approach to adult education in Portugal: Collaborative project work in an alternative curriculum.

    Directory of Open Access Journals (Sweden)

    Courela C.

    2014-09-01

    Full Text Available Collaborative project work facilitates social interactions among peers and between them and their teachers. It allows students to work in their zone of proximal development (ZPD, promoting their knowledge appropriation. It empowers adult students, allowing them to express their voices and their cultures. Inter-empowerment mechanisms are part of this process, facilitating the internalization of intra-empowerment mechanisms. Both of them shape students’ life trajectories of participation (César, 2013a. This work is part of the Interaction and Knowledge (IK project. During 12 years (1994/1995–2005/2006 we studied and promoted social interactions in formal educational scenarios. We assumed an interpretative paradigm and developed an action-research project (three-year alternative curriculum, 7th–9th grades and a 10-year follow up. The participants were the seven students who completed this course, their teachers, and other educational and social agents. Data collecting instruments included observation, interviews, informal conversations, tasks inspired by projective techniques, students’ protocols, and documents. Data treatment and analysis were based on a narrative content analysis. The results are mainly focused on one student: Ernesto. His legitimate participation in this course facilitated his inclusion in school and in society. It promoted his socio-cognitive and emotional development and allowed him to internalize intra-empowerment mechanisms. This enabled him to improve his life trajectory of participation.

  4. Multiuser Switched Diversity Scheduling Schemes

    CERN Document Server

    Shaqfeh, Mohammad; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback sys...

  5. Medicare Program; Merit-Based Incentive Payment System (MIPS) and Alternative Payment Model (APM) Incentive Under the Physician Fee Schedule, and Criteria for Physician-Focused Payment Models. Final rule with comment period.

    Science.gov (United States)

    2016-11-04

    The Medicare Access and CHIP Reauthorization Act of 2015 (MACRA) repeals the Medicare sustainable growth rate (SGR) methodology for updates to the physician fee schedule (PFS) and replaces it with a new approach to payment called the Quality Payment Program that rewards the delivery of high-quality patient care through two avenues: Advanced Alternative Payment Models (Advanced APMs) and the Merit-based Incentive Payment System (MIPS) for eligible clinicians or groups under the PFS. This final rule with comment period establishes incentives for participation in certain alternative payment models (APMs) and includes the criteria for use by the Physician-Focused Payment Model Technical Advisory Committee (PTAC) in making comments and recommendations on physician-focused payment models (PFPMs). Alternative Payment Models are payment approaches, developed in partnership with the clinician community, that provide added incentives to deliver high-quality and cost-efficient care. APMs can apply to a specific clinical condition, a care episode, or a population. This final rule with comment period also establishes the MIPS, a new program for certain Medicare-enrolled practitioners. MIPS will consolidate components of three existing programs, the Physician Quality Reporting System (PQRS), the Physician Value-based Payment Modifier (VM), and the Medicare Electronic Health Record (EHR) Incentive Program for Eligible Professionals (EPs), and will continue the focus on quality, cost, and use of certified EHR technology (CEHRT) in a cohesive program that avoids redundancies. In this final rule with comment period we have rebranded key terminology based on feedback from stakeholders, with the goal of selecting terms that will be more easily identified and understood by our stakeholders.

  6. Work.

    Science.gov (United States)

    Haines, Annette M.

    2003-01-01

    Draws upon Maria Montessori's writings to examine work as a universal human tendency throughout life. Discusses the work of adaptation of the infant, work of "psycho-muscular organism" for the preschooler, work of the imagination for the elementary child, community work of the adolescent, and work of the adult. Asserts that…

  7. From "does it work?" to "what is 'it'?": implications for voodoo, psychotherapy, pop-psychology, regular, and alternative medicine.

    Science.gov (United States)

    Mommaerts, Jean-Luc; Devroey, Dirk

    2013-01-01

    In this article, a "healing method" (HM) is defined as any method intended to improve health through non-somatic means. For many healing methods, especially within the realm of complementary and alternative medicine (CAM), there is mounting debate over the question "Does it work?" Indeed, this seems to be the primary question for most stakeholders. Yet in light of the well-documented effects of nonspecific factors, particularly empathy and placebo (EP), we contend that the basic question is: "What is 'it'?" Without answering this question, scientific progress is impossible, and research costs will spiral upwards without producing tangible results. Furthermore, it is impossible to characterize the potential side effects of healing methods without a full understanding of the underlying mechanisms through which they act. It is generally acknowledged that many healing methods are sociohistorical artifacts, based on underlying theoretical models that are divorced from established science. There is a need for healing method research that is accommodating of such methods' fluid nature while being congruent with accepted scientific practices. "It works" is no longer an adequate justification for any healing method, as "it" often turns out to be a combination of nonspecific factors.

  8. CMS multicore scheduling strategy

    Energy Technology Data Exchange (ETDEWEB)

    Perez-Calero Yzquierdo, Antonio [Madrid, CIEMAT; Hernandez, Jose [Madrid, CIEMAT; Holzman, Burt [Fermilab; Majewski, Krista [Fermilab; McCrea, Alison [UC, San Diego

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  9. 考虑班次约束的Job Shop等量分批调度算法%A Scheduling Algorithm to Equal Amount of Batches for Job Shop Considering the Constraint of Work-shifts

    Institute of Scientific and Technical Information of China (English)

    黄瑜岳; 李克清; 郑晓峰

    2013-01-01

    To solve the problem of multi-objective flexible job shop scheduling with many varieties and large amount of products, a novel multi-object heuristic scheduling algorithm base on equal amount of batches is proposed.The algorithm, which considered the constraint of work-shifts in factory, could obtain three scheduling results by using EDD, SPT and OSPT batch selecting strategy in the condition of machine selecting strategy using FIFS.As a result, the decision maker could choose the most appropriate scheduling solution according to the performance of the three kinds of scheduling results.Finally, An example showed that the algorithm is efficient and feasible.%为解决产品种类多、中小批量的多目标柔性作业车间调度问题,提出了一种基于等量分批方法的多目标柔性分批启发式调度算法.考虑了实际生产中的班次作息时间等约束,采用FIFS与EDD、SPT及OSPT策略相结合的多种分派规则,使得算法在优先调度空闲机床的情况下,根据不同的分派策略得出短批次优先、短订单优先、交货时间优先的三种调度结果,决策者可根据三种调度结果的性能选择最适合的调度方案.实例计算结果表明,该算法是高效、可行的.

  10. A Scheduling Problem for Hospital Operating Theatre

    CERN Document Server

    Sufahani, Suliadi F; Ismail, Zuhaimy

    2012-01-01

    This paper provides a classification of real scheduling problems. Various ways have been examined and described on the problem. Scheduling problem faces a tremendous challenges and difficulties in order to meet the preferences of the consumer. Dealing with scheduling problem is complicated, inefficient and time-consuming. This study aims to develop a mathematical model for scheduling the operating theatre during peak and off peak time. Scheduling problem is a well known optimization problem and the goal is to find the best possible optimal solution. In this paper, we used integer linear programming technique for scheduling problem in a high level of synthesis. In addition, time and resource constrained scheduling was used. An optimal result was fully obtained by using the software GLPK/AMPL. This model can be adopted to solve other scheduling problems, such as the Lecture Theatre, Cinemas and Work Shift.

  11. Scheduling the Secondary School.

    Science.gov (United States)

    Dempsey, Richard A.; Traverso, Henry P.

    This "how-to-do-it" manual on the intricacies of school scheduling offers both technical information and common sense advice about the process of secondary school scheduling. The first of six chapters provides an overview of scheduling; chapter 2 examines specific considerations for scheduling; chapter 3 surveys the scheduling models and their…

  12. The GBT Dynamic Scheduling System: A New Scheduling Paradigm

    Science.gov (United States)

    O'Neil, K.; Balser, D.; Bignell, C.; Clark, M.; Condon, J.; McCarty, M.; Marganian, P.; Shelton, A.; Braatz, J.; Harnett, J.; Maddalena, R.; Mello, M.; Sessoms, E.

    2009-09-01

    The Robert C. Byrd Green Bank Telescope (GBT) is implementing a new Dynamic Scheduling System (DSS) designed to maximize the observing efficiency of the telescope while ensuring that none of the flexibility and ease of use of the GBT is harmed and that the data quality of observations is not adversely affected. To accomplish this, the GBT DSS is implementing a dynamic scheduling system which schedules observers, rather than running scripts. The DSS works by breaking each project into one or more sessions which have associated observing criteria such as RA, Dec, and frequency. Potential observers may also enter dates when members of their team will not be available for either on-site or remote observing. The scheduling algorithm uses those data, along with the predicted weather, to determine the most efficient schedule for the GBT. The DSS provides all observers at least 24 hours notice of their upcoming observing. In the uncommon (DSS project, including the ranking and scheduling algorithms for the sessions, the scheduling probabilities generation, the web framework for the system, and an overview of the results from the beta testing which were held from June - September, 2008.

  13. Drilling works on the upper gateroad. An alternative in gateroad and tunnel excavation; Bohren auf der oberen Ebene. Eine wirtschaftliche Alternative im Streckenvortrieb im Bergbau und im Tunnelbau

    Energy Technology Data Exchange (ETDEWEB)

    Seelhoff, Guenther [GTA Maschinensysteme GmbH, Hamminkeln (Germany)

    2013-02-15

    If the use of machinery to drive gateroads and tunnels is restricted to the floor of the cross-section, the individual working steps of excavation and support have to be performed successively, so the advance rate will be determined by the duration of the individual working steps and the setting-up times for moving machines. For nearly all roadway and tunnel drives, however, it is also possible to carry out drilling works using mobile drill rigs suspended from the crown. The separation of working levels opens up many opportunities for performing working steps in parallel as a precondition for faster advance rates. The article summarises the state of development of the machinery available for driving roadways and galleries using roadheaders and drill and blast in mining as well as in conventional tunnel construction. (orig.)

  14. Minimally disruptive schedule repair for MCM missions

    Science.gov (United States)

    Molineaux, Matthew; Auslander, Bryan; Moore, Philip G.; Gupta, Kalyan M.

    2015-05-01

    Mine countermeasures (MCM) missions entail planning and operations in very dynamic and uncertain operating environments, which pose considerable risk to personnel and equipment. Frequent schedule repairs are needed that consider the latest operating conditions to keep mission on target. Presently no decision support tools are available for the challenging task of MCM mission rescheduling. To address this capability gap, we have developed the CARPE system to assist operation planners. CARPE constantly monitors the operational environment for changes and recommends alternative repaired schedules in response. It includes a novel schedule repair algorithm called Case-Based Local Schedule Repair (CLOSR) that automatically repairs broken schedules while satisfying the requirement of minimal operational disruption. It uses a case-based approach to represent repair strategies and apply them to new situations. Evaluation of CLOSR on simulated MCM operations demonstrates the effectiveness of case-based strategy. Schedule repairs are generated rapidly, ensure the elimination of all mines, and achieve required levels of clearance.

  15. Optimizing Music Learning: Exploring How Blocked and Interleaved Practice Schedules Affect Advanced Performance

    Science.gov (United States)

    Carter, Christine E.; Grahn, Jessica A.

    2016-01-01

    Repetition is the most commonly used practice strategy by musicians. Although blocks of repetition continue to be suggested in the pedagogical literature, work in the field of cognitive psychology suggests that repeated events receive less processing, thereby reducing the potential for long-term learning. Motor skill learning and sport psychology research offer an alternative. Instead of using a blocked practice schedule, with practice completed on one task before moving on to the next task, an interleaved schedule can be used, in which practice is frequently alternated between tasks. This frequent alternation involves more effortful processing, resulting in increased long-term learning. The finding that practicing in an interleaved schedule leads to better retention than practicing in a blocked schedule has been labeled the “contextual interference effect.” While the effect has been observed across a wide variety of fields, few studies have researched this phenomenon in a music-learning context, despite the broad potential for application to music practice. This study compared the effects of blocked and interleaved practice schedules on advanced clarinet performance in an ecologically valid context. Ten clarinetists were given one concerto exposition and one technical excerpt to practice in a blocked schedule (12 min per piece) and a second concerto exposition and technical excerpt to practice in an interleaved schedule (3 min per piece, alternating until a total of 12 min of practice were completed on each piece). Participants sight-read the four pieces prior to practice and performed them at the end of practice and again one day later. The sight-reading and two performance run-throughs of each piece were recorded and given to three professional clarinetists to rate using a percentage scale. Overall, whenever there was a ratings difference between the conditions, pieces practiced in the interleaved schedule were rated better than those in the blocked schedule

  16. Multiprocessor scheduling with rejection

    Energy Technology Data Exchange (ETDEWEB)

    Bartal, Y. [Tel-Aviv Univ. (Israel); Leonardi, S.; Marchetti-Spaccamela, A. [Universita di Roma (Italy); Sgall, J. [Mathematical Inst., Zitna (Czechoslovakia)] [and others

    1996-12-31

    We consider a version of multiprocessor scheduling with the special feature that jobs may be rejected for a certain penalty. An instance of the problem is given by m identical parallel machines and a set of n jobs, each job characterized by a processing time and a penalty. In the on-line version the jobs arrive one by one and we have to schedule or reject a job before we have any information about future jobs. The objective is to minimize the makespan of the schedule for accepted jobs plus the sum of the penalties of rejected jobs. The main result is a 1 + {phi} {approx} 2.618 competitive algorithm for the on-line version of the problem, where 0 is the golden ratio. A matching lower bound shows that this is the best possible algorithm working for all m. For fixed m we give improved bounds, in particular for m = 2 we give an optimal {phi} {approx} 1.618 competitive algorithm. For the off-line problem we present a fully polynomial approximation scheme for fixed m and an approximation algorithm which runs in time O(n log n) for arbitrary m and guarantees 2 - 1/m approximation ratio.

  17. Customer Appeasement Scheduling

    CERN Document Server

    Nikseresht, Mohammad R; Maheshwari, Anil

    2010-01-01

    Almost all of the current process scheduling algorithms which are used in modern operating systems (OS) have their roots in the classical scheduling paradigms which were developed during the 1970's. But modern computers have different types of software loads and user demands. We think it is important to run what the user wants at the current moment. A user can be a human, sitting in front of a desktop machine, or it can be another machine sending a request to a server through a network connection. We think that OS should become intelligent to distinguish between different processes and allocate resources, including CPU, to those processes which need them most. In this work, as a first step to make the OS aware of the current state of the system, we consider process dependencies and interprocess communications. We are developing a model, which considers the need to satisfy interactive users and other possible remote users or customers, by making scheduling decisions based on process dependencies and interproce...

  18. New VLBI2010 scheduling strategies and implications on the terrestrial reference frames.

    Science.gov (United States)

    Sun, Jing; Böhm, Johannes; Nilsson, Tobias; Krásná, Hana; Böhm, Sigrid; Schuh, Harald

    In connection with the work for the next generation VLBI2010 Global Observing System (VGOS) of the International VLBI Service for Geodesy and Astrometry, a new scheduling package (Vie_Sched) has been developed at the Vienna University of Technology as a part of the Vienna VLBI Software. In addition to the classical station-based approach it is equipped with a new scheduling strategy based on the radio sources to be observed. We introduce different configurations of source-based scheduling options and investigate the implications on present and future VLBI2010 geodetic schedules. By comparison to existing VLBI schedules of the continuous campaign CONT11, we find that the source-based approach with two sources has a performance similar to the station-based approach in terms of number of observations, sky coverage, and geodetic parameters. For an artificial 16 station VLBI2010 network, the source-based approach with four sources provides an improved distribution of source observations on the celestial sphere. Monte Carlo simulations yield slightly better repeatabilities of station coordinates with the source-based approach with two sources or four sources than the classical strategy. The new VLBI scheduling software with its alternative scheduling strategy offers a promising option with respect to applications of the VGOS.

  19. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    In a modern society, manpower can be both a scarce and an expensive resource. Skilled personnel is usually in high demand and accounts for a significant part of total expenses in many companies. When the work is divided in shifts, a roster is compiled to allocate these to the employees. The roste......In a modern society, manpower can be both a scarce and an expensive resource. Skilled personnel is usually in high demand and accounts for a significant part of total expenses in many companies. When the work is divided in shifts, a roster is compiled to allocate these to the employees....... The rostering process is non-trivial and especially when service is required around the clock, rostering may involve considerable effort from a designated planner. Therefore, in order to minimize costs and overstaffing, to maximize the utilization of available staff, and to ensure a high level of satisfaction...... among the employees, sophisticated scheduling methods are required. When approaching the day of operation, the detail level of the planning becomes finer. With a given allocation of shifts to employees, the focus is turned to tasks scheduling within those shifts. The objective is to assign as much work...

  20. Scheduling and routing Tactical Aerial Reconnaissance Vehicles

    OpenAIRE

    1990-01-01

    Approved for public release; distribution unlimited. In this thesis we study the Marine Corps Tactical Aerial Reconnaissance Vehicle routing and scheduling problem. the present method of routing and scheduling is presented, along with possible implications for routing and scheduling when future expansion of vehicle assets becomes available. A review of current literature is given and comparisons are drawn between our problem and recent work. A model for the problem, which we call the Multi...

  1. Dynamic Fractional Resource Scheduling vs. Batch Scheduling

    CERN Document Server

    Casanova, Henri; Vivien, Frédéric

    2011-01-01

    We propose a novel job scheduling approach for homogeneous cluster computing platforms. Its key feature is the use of virtual machine technology to share fractional node resources in a precise and controlled manner. Other VM-based scheduling approaches have focused primarily on technical issues or on extensions to existing batch scheduling systems, while we take a more aggressive approach and seek to find heuristics that maximize an objective metric correlated with job performance. We derive absolute performance bounds and develop algorithms for the online, non-clairvoyant version of our scheduling problem. We further evaluate these algorithms in simulation against both synthetic and real-world HPC workloads and compare our algorithms to standard batch scheduling approaches. We find that our approach improves over batch scheduling by orders of magnitude in terms of job stretch, while leading to comparable or better resource utilization. Our results demonstrate that virtualization technology coupled with light...

  2. Automated Scheduling of Personnel to Staff Operations for the Mars Science Laboratory

    Science.gov (United States)

    Knight, Russell; Mishkin, Andrew; Allbaugh, Alicia

    2014-01-01

    Leveraging previous work on scheduling personnel for space mission operations, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] to the domain of scheduling personnel for operations of the Mars Science Laboratory. Automated scheduling of personnel is not new. We compare our representations to a sampling of employee scheduling systems available with respect to desired features. We described the constraints required by MSL personnel schedulers and how each is handled by the scheduling algorithm.

  3. An Efficient SJRR CPU Scheduling Algorithm

    Directory of Open Access Journals (Sweden)

    Saeeda Bibi

    2010-05-01

    Full Text Available CPU Scheduling is a vital discipline which helps us gain deep insight into the complex set of policies and mechanisms used to govern the order in which tasks are executed by the processor. This article proposes an efficient Shortest Job Round Robin (SJRR CPU Scheduling algorithm having better average waiting time (AWT and average turnaround time (ATT as compared to other CPU Scheduling techniques. The primary objective of this algorithm is to optimize system performance according to the criteria deemed most important by system designers. Included in this work, is a simulation that compares the proposed algorithms with some well known practices to CPU scheduling.

  4. Fair Scheduling in Networks Through Packet Election

    CERN Document Server

    Jagabathula, Srikanth

    2008-01-01

    We consider the problem of designing a fair scheduling algorithm for discrete-time constrained queuing networks. Each queue has dedicated exogenous packet arrivals. There are constraints on which queues can be served simultaneously. This model effectively describes important special instances like network switches, interference in wireless networks, bandwidth sharing for congestion control and traffic scheduling in road roundabouts. Fair scheduling is required because it provides isolation to different traffic flows; isolation makes the system more robust and enables providing quality of service. Existing work on fairness for constrained networks concentrates on flow based fairness. As a main result, we describe a notion of packet based fairness by establishing an analogy with the ranked election problem: packets are voters, schedules are candidates and each packet ranks the schedules based on its priorities. We then obtain a scheduling algorithm that achieves the described notion of fairness by drawing upon ...

  5. Widening the Schedulability Hierarchical Scheduling Systems

    DEFF Research Database (Denmark)

    Boudjadar, Jalil; David, Alexandre; Kim, Jin Hyun;

    2014-01-01

    This paper presents a compositional approach for schedula- bility analysis of hierarchical systems, which enables to prove more sys- tems schedulable by having richer and more detailed scheduling models. We use a lightweight method (statistical model checking) for design ex- ploration, easily...... assuring high confidence in the correctness of the model. A satisfactory design can be proved schedulable using the computation costly method (symbolic model checking). In order to analyze a hierar- chical scheduling system compositionally, we introduce the notion of a stochastic supplier modeling...... the supply of resources in each component. We specifically investigate two different techniques to widen the set of provably schedulable systems: 1) a new supplier model; 2) restricting the potential task offsets. We also provide a way to estimate the minimum resource supply (budget) that a component...

  6. Immunization Schedules for Adults

    Science.gov (United States)

    ... Everyone: Easy-to-read Schedules Infants and Children Preteens and Teens Adults Display Immunization Schedules and Quiz ... file Microsoft Word file Microsoft Excel file Audio/Video file Apple Quicktime file RealPlayer file Text file ...

  7. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Everyone: Easy-to-read Schedules Infants and Children Preteens and Teens Adults Display Immunization Schedules and Quiz ... file Microsoft Word file Microsoft Excel file Audio/Video file Apple Quicktime file RealPlayer file Text file ...

  8. Reinforcement learning in scheduling

    Science.gov (United States)

    Dietterich, Tom G.; Ok, Dokyeong; Zhang, Wei; Tadepalli, Prasad

    1994-01-01

    The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

  9. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  10. Batch Scheduling a Fresh Approach

    Science.gov (United States)

    Cardo, Nicholas P.; Woodrow, Thomas (Technical Monitor)

    1994-01-01

    The Network Queueing System (NQS) was designed to schedule jobs based on limits within queues. As systems obtain more memory, the number of queues increased to take advantage of the added memory resource. The problem now becomes too many queues. Having a large number of queues provides users with the capability to gain an unfair advantage over other users by tailoring their job to fit in an empty queue. Additionally, the large number of queues becomes confusing to the user community. The High Speed Processors group at the Numerical Aerodynamics Simulation (NAS) Facility at NASA Ames Research Center developed a new approach to batch job scheduling. This new method reduces the number of queues required by eliminating the need for queues based on resource limits. The scheduler examines each request for necessary resources before initiating the job. Also additional user limits at the complex level were added to provide a fairness to all users. Additional tools which include user job reordering are under development to work with the new scheduler. This paper discusses the objectives, design and implementation results of this new scheduler

  11. Specific schedule conditions for the formation of personnel of A or B category working in nuclear facilities. Option nuclear reactor-borne

    CERN Document Server

    Int. At. Energy Agency, Wien

    2002-01-01

    This document describes the specific dispositions relative to the nuclear reactor-borne domain, for the formation to the conventional and radiation risks prevention of personnel of A or B category working in nuclear facilities. The application domain, the applicable documents, the liability, the specificity of the nuclear reactor-borne and of the retraining, the Passerelle formation, are presented. (A.L.B.)

  12. Envelhecimento e trabalho: um desafio para a agenda da reabilitação Aging and work: a challenge for the rehabilitation schedule

    Directory of Open Access Journals (Sweden)

    Rosana F. Sampaio

    2012-04-01

    Full Text Available CONTEXTUALIZAÇÃO: O envelhecimento acelerado da população trabalhadora tem motivado o desenvolvimento de estudos que buscam manter boas condições de saúde, capacidade para o trabalho (CT, autonomia e integração social dos trabalhadores. OBJETIVOS: Apresentar o arcabouço teórico, as mensurações disponíveis e os modelos de promoção da CT. DISCUSSÃO: No campo da reabilitação, a sedimentação do modelo conceitual de CT tem função normativa e pode ser útil para avaliar o que é necessário para se classificar uma pessoa com perda temporária ou permanente da CT e definir um programa de reabilitação específico. O conceito pode ajudar ainda a determinar diferentes aspectos, internos e externos à pessoa, os quais podem contribuir para melhorar ou restaurar a sua capacidade para o trabalho. CONCLUSÃO: Para se aprofundar nas mensurações disponíveis, propor novas aferições e intervenções para promover a CT, além de potencializar seu uso como desfecho na reabilitação, é necessário assumir que os preditores se relacionam com o indivíduo, o trabalho e a vida fora do trabalho a partir de interações dinâmicas, que exigem métodos analíticos que deem conta da multidimensionalidade do constructo.BACKGROUND: The rapid aging of the workforce has motivated the development of studies that seek to maintain good health conditions, work ability, autonomy and the social integration of workers. OBJECTIVES: To present the theoretical framework, available measurements and models for promoting work ability. DISCUSSION: In the field of rehabilitation, the sedimentation of the conceptual model of the ability to work has a normative role and may be useful for assessing whether a person has a temporary or permanent loss of capacity as well as for defining a specific rehabilitation program. The concept may further help determine different aspects, both internal and external to the person, that could result in improved or restored work

  13. Garbage Collection Scheduling of Aperiodic Tasks

    Institute of Scientific and Technical Information of China (English)

    Ning Zhang; Guang-Ze Xiong

    2009-01-01

    In the previous work of garbage collection (GC) models, scheduling analysis was given based on an assumption that there were no aperiodic mutator tasks. However, it is not true in practical real-time systems. The GC algorithm which can schedule aperiodic tasks is proposed, and the variance of live memory is analyzed. In this algorithm, active tasks are deferred to be processed by GC until the states of tasks become inactive, and the saved sporadic server time can be used to schedule aperiodic tasks. Scheduling the sample task sets demonstrates that this algorithm in this paper can schedule aperiodic tasks and decrease GC work. Thus, the GC algorithm proposed is more flexible and portable.

  14. DSN Scheduling Engine

    Science.gov (United States)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  15. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  16. Routing and scheduling problems

    DEFF Research Database (Denmark)

    Reinhardt, Line Blander

    In today’s globalized society, transport contributes to our daily life in many different ways. The production of the parts for a shelf ready product may take place on several continents and our travel between home and work, vacation travel and business trips has increased in distance the last......, the effectiveness of the network is of importance aiming at satisfying as many costumer demands as possible at a low cost. Routing represent a path between locations such as an origin and destination for the object routed. Sometimes routing has a time dimension as well as the physical paths. This may...... to a destination on a predefined network, the routing and scheduling of vessels in a liner shipping network given a demand forecast to be covered, the routing of manpower and vehicles transporting disabled passengers in an airport and the vehicle routing with time windows where one version studied includes edge...

  17. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  18. Optimal Schedules in Multitask Motor Learning.

    Science.gov (United States)

    Lee, Jeong Yoon; Oh, Youngmin; Kim, Sung Shin; Scheidt, Robert A; Schweighofer, Nicolas

    2016-04-01

    Although scheduling multiple tasks in motor learning to maximize long-term retention of performance is of great practical importance in sports training and motor rehabilitation after brain injury, it is unclear how to do so. We propose here a novel theoretical approach that uses optimal control theory and computational models of motor adaptation to determine schedules that maximize long-term retention predictively. Using Pontryagin's maximum principle, we derived a control law that determines the trial-by-trial task choice that maximizes overall delayed retention for all tasks, as predicted by the state-space model. Simulations of a single session of adaptation with two tasks show that when task interference is high, there exists a threshold in relative task difficulty below which the alternating schedule is optimal. Only for large differences in task difficulties do optimal schedules assign more trials to the harder task. However, over the parameter range tested, alternating schedules yield long-term retention performance that is only slightly inferior to performance given by the true optimal schedules. Our results thus predict that in a large number of learning situations wherein tasks interfere, intermixing tasks with an equal number of trials is an effective strategy in enhancing long-term retention.

  19. Routing and scheduling problems

    DEFF Research Database (Denmark)

    Reinhardt, Line Blander

    be that the objects routed have an availability time window and a delivery time window or that locations on the path have a service time window. When routing moving transportation objects such as vehicles and vessels schedules are made in connection with the routing. Such schedules represent the time for the presence...... to a destination on a predefined network, the routing and scheduling of vessels in a liner shipping network given a demand forecast to be covered, the routing of manpower and vehicles transporting disabled passengers in an airport and the vehicle routing with time windows where one version studied includes edge...... of a connection between two locations. This could be an urban bus schedule where busses are routed and this routing creates a bus schedule which the passengers between locations use. In this thesis various routing and scheduling problems will be presented. The topics covered will be routing from an origin...

  20. 云环境下基于 SLA 的工作队列调配算法研究%A Cloud Environment Work Queue Scheduling Algorithm Based on SLA

    Institute of Scientific and Technical Information of China (English)

    甘泉; 郑均辉

    2015-01-01

    In cloud computing environment ,task scheduling and computing resources allocation is constrained by the SLA .Different tasks require different QoS ,so the work queue is classified with constraints of the SLA parameter .Task is allocated on the computing resources by reasonable assignment of work node in the resource level queue .%云计算环境下,工作任务的调度和计算资源的分配受到 SLA 的约束。不同的工作任务要求不同的 QoS ,采用具有 SLA 参数的约束条件,对任务划分优先级,形成优先级队列。在对该任务分配计算资源时,采用资源等级队列的方法,分配合理的工作节点已完成任务。

  1. 云环境下基于SLA的工作队列调配算法研究%A Work QUeUe SchedUling Algorithm Based on SLA Under CloUd Environment

    Institute of Scientific and Technical Information of China (English)

    王启明; 甘泉

    2016-01-01

    云计算环境下,工作任务的调度和计算资源的分配受到SLA的约束。不同的工作任务要求不同的QoS,采用具有SLA参数的约束条件,对任务划分优先级,形成优先级队列。在对该任务分配计算资源时,采用资源等级队列的方法,分配合理的工作节点已完成任务。%Under cloud computing environment,task scheduling and computing resources allocation is constrained by the SLA. Different tasks require different QoS,so the work queue is classified with constraints of the SLA parameter. Task is allocated on the computing resources by reasonable assignment of work node in the resource level queue.

  2. Changing Times: The Use of Reduced Work Time Options in the United States.

    Science.gov (United States)

    Olmsted, Barney

    1983-01-01

    This article addresses the increase in voluntary reduced work time arrangements that have developed in the United States in response to growing interest in alternatives to the standardized approach to scheduling. Permanent part-time employment, job sharing, and voluntary reduced work time plans are defined, described and, to a limited extent,…

  3. Visually Exploring Transportation Schedules.

    Science.gov (United States)

    Palomo, Cesar; Guo, Zhan; Silva, Cláudio T; Freire, Juliana

    2016-01-01

    Public transportation schedules are designed by agencies to optimize service quality under multiple constraints. However, real service usually deviates from the plan. Therefore, transportation analysts need to identify, compare and explain both eventual and systemic performance issues that must be addressed so that better timetables can be created. The purely statistical tools commonly used by analysts pose many difficulties due to the large number of attributes at trip- and station-level for planned and real service. Also challenging is the need for models at multiple scales to search for patterns at different times and stations, since analysts do not know exactly where or when relevant patterns might emerge and need to compute statistical summaries for multiple attributes at different granularities. To aid in this analysis, we worked in close collaboration with a transportation expert to design TR-EX, a visual exploration tool developed to identify, inspect and compare spatio-temporal patterns for planned and real transportation service. TR-EX combines two new visual encodings inspired by Marey's Train Schedule: Trips Explorer for trip-level analysis of frequency, deviation and speed; and Stops Explorer for station-level study of delay, wait time, reliability and performance deficiencies such as bunching. To tackle overplotting and to provide a robust representation for a large numbers of trips and stops at multiple scales, the system supports variable kernel bandwidths to achieve the level of detail required by users for different tasks. We justify our design decisions based on specific analysis needs of transportation analysts. We provide anecdotal evidence of the efficacy of TR-EX through a series of case studies that explore NYC subway service, which illustrate how TR-EX can be used to confirm hypotheses and derive new insights through visual exploration.

  4. Innovative scheduling to maintain clinical pharmacy services despite budget retrenchment.

    Science.gov (United States)

    Siegel, J; Schneider, P J; Moore, T D

    1984-02-01

    A process is described in which staff scheduling was adjusted to maintain pharmaceutical services while achieving a 7% cutback in personnel costs. The pharmacy department in a 1000-bed university hospital was unable to achieve the necessary cost savings through reductions in sick leave and overtime hours. The pharmacy administration developed a plan that required pharmacists to work four 10-hour shifts per week and resulted in reduced hours of service. The pharmacists objected and proposed an alternative plan in which clinical service was maintained for 16 hours on weekdays and 12 hours on weekends. Pharmacist teams worked one flexible shift per week. Pharmacists developed an innovative staffing plan that allowed them to maintain a high level of practice and acceptable working hours.

  5. Scheduling Algorithm for Complex Product Development

    Institute of Scientific and Technical Information of China (English)

    LIUMin; ZHANGLong; WUCheng

    2004-01-01

    This paper describes the Complex product development project scheduling problem (CPDPSP) with a great number of activities, complicated resource, precedence and calendar constraints. By the conversion of precedence constraint relations, the CPDPSP is simplified. Then, according to the predictive control principle, we propose a new scheduling algorithm Based on prediction (BoP-procedure). In order to get the problem characteristics coming from resource status and precedence constraints of the scheduling problem at the scheduling time, a sub-project is constructed on the basis of a sub-AoN (Activity on node) graph of the project. Then, we use the modified GDH-procedure to solve the sub-project scheduling problem and to obtain the maximum feasible active subset for determining the activity group which satisfies resource, precedence and calendar constraints and has the highest scheduling priority at the scheduling time. Additionaily, we make a great number of numerical computations and compare the performance of BoP-procedure algorithm with those of other scheduling algorithms. Computation results show that the BoP-procedure algorithm is more suitable for the CPDPSP. At last, we discuss briefly future research work in the CPDPSP.

  6. Improved MLWDF scheduler for LTE downlink transmission

    Science.gov (United States)

    Obinna Nnamani, Christantus; Anioke, Chidera Linda; Ikechukwu Ani, Cosmas

    2016-11-01

    In long-term evolution (LTE) downlink transmission, modified least weighted delay first (MLWDF) scheduler is a quality of service (QoS) aware scheduling scheme for real-time (RT) services. Nevertheless, MLWDF performs below optimal among the trade-off between strict delay and loss restraints of RT and non-RT traffic flows, respectively. This is further worsened with the implementation of hybrid automatic retransmission request (HARQ). As these restraints grow unabated with increasing number of user demands, the performance of MLWDF further reduces. In order to ameliorate this situation, there is a need to directly incorporate the variations in user demands and HARQ implementation as parameters to the MLWDF scheduler. In this work, an improvement to the MLWDF scheduler is proposed. The improvement entails adding two novel parameters that characterise user demand and HARQ implementation. The scheduler was tested using varying three classes of service in QoS class identifiers (QCIs) table standardised by Third Generation Partnership Project for LTE network to characterise different services. It was also tested on the basis of packet prioritisation. The proposed scheduler was simulated with LTE-SIM simulator and compared with the MLWDF and proportional fairness schedulers. In terms of delay, throughput and packet loss ratio; the proposed scheduler increased overall system performance.

  7. Recursive decision-making feedback extension (RDFE) for fuzzy scheduling scheme applied on electrical power control generation

    Energy Technology Data Exchange (ETDEWEB)

    Gracios-Marin, C.A.; Nuno-de-la-Parra, P.; Vega-Lebrum, Carlos [Universidad Popular Autonoma del Estado de Puebla, 21 Sur 1103 Col, Puebla, Pue, 72220 Santiago (Mexico); Munoz-Hernandez, G.A.; Estevez-Carreon, J. [Instituto Tecnologico de Puebla, Av. Tecnologico 420. Col. Maravillas, Puebla, Pue (Mexico); Diaz-Sanchez, A. [INAOE. - Luis Enrique Erro. No. 1, Tonantzintla, Puebla (Mexico)

    2009-07-15

    A new decision feedback extension (DFE) and an alternative application to schedule industrial processes are presented. The DFE is defined as a recursive decision feedback extension (RDFE), where the recursive part is developed to assign the probability of occurrence in the operation of a set of machines working together using an objective function of production. The fundaments of fuzzy factors and the principle of maximum membership function are used to develop the new extension. At last, RDFE is proposed to generate a fuzzy scheduler, which is used to apply an intelligent control scheme to a hydropower station. (author)

  8. Alternate operating scenarios for NDCX-II

    Energy Technology Data Exchange (ETDEWEB)

    Sharp, W.M., E-mail: wmsharp@lbl.gov [Lawrence Livermore National Laboratory, Livermore, CA, United States of America (United States); Friedman, A.; Grote, D.P.; Cohen, R.H.; Lund, S.M. [Lawrence Livermore National Laboratory, Livermore, CA, United States of America (United States); Vay, J.-L.; Waldron, W.L. [Lawrence Berkeley National Laboratory, Berkeley, CA, United States of America (United States)

    2014-01-01

    NDCX-II is a newly completed accelerator facility at LBNL, built to study ion-heated warm dense matter, as well as aspects of ion-driven targets and intense-beam dynamics for inertial-fusion energy. The baseline design calls for using 12 induction cells to accelerate 30–50 nC of Li{sup +} ions to 1.2 MeV. During commissioning, though, we plan to extend the source lifetime by extracting less total charge. Over time, we expect that NDCX-II will be upgraded to substantially higher energies, necessitating the use of heavier ions to keep a suitable deposition range in targets. For operational flexibility, the option of using a helium plasma source is also being investigated. Each of these options requires development of an alternate acceleration schedule. The schedules here are worked out with a fast-running 1-D particle-in-cell code ASP.

  9. "Working and Learning Alternation" Nursing Teaching Mode in Hospital%护理"工学交替"教学模式在医院的实践

    Institute of Scientific and Technical Information of China (English)

    邱艳华

    2012-01-01

    Objective: To explore practical effects of reformed nursing teaching mode "working and learning alternation" performed by hospital and school together. Method: On the foundation of meeting the requirement of major courses, corresponding class featured in hospital and clinical practice teaching, which centered on nursing practice teaching and guided by employment, were administered to students by hospital. Result: Nursing teaching mode "working and learning mode" could effectively help students accumulate clinical work experience, enhance personal communication skills, fully improve comprehensive quality of students and also the scores of nursing licensed exam. Conclusion: Nursing teaching mode "working and learning alternation" demonstrates remarkable advantages in improving students' comprehensive quality, master and application of the knowledge compared with traditional teaching mode of school.%目的:探讨学校与医院联合进行"工学交替"护理教学模式改革的实践效果.方法:医院以护理实践教学为中心,以就业为导向,在满足学校本专业课程的基础上,对学生进行具有医院特色的课堂教学及临床实践教学.结果:"工学交替"的护理教学模式有效促进了学生实际工作经验的积累,增强了学生的人际沟通技巧,全面提高了学生的综合素质,学生护理执业考试成绩大幅提高.结论:"工学交替"的护理教学模式相较于学校传统教学模式在学生的综合素质提高、知识的掌握及运用上都有明显优势.

  10. Interval Scheduling: A Survey

    NARCIS (Netherlands)

    Kolen, A.W.J.; Lenstra, J.K.; Papadimitriou, C.H.; Spieksma, F.C.R.

    2007-01-01

    In interval scheduling, not only the processing times of the jobs but also their starting times are given. This article surveys the area of interval scheduling and presents proofs of results that have been known within the community for some time. We first review the complexity and approximability o

  11. Job Schedules That Work for Students

    Science.gov (United States)

    Ben-Ishai, Liz

    2014-01-01

    The price tag on a college education is higher than ever--but not having a degree is even more costly, according to recent studies. However, for lower-income students, getting to a college degree isn't so simple. Student financial need after grant aid (commonly referred to as "unmet need") averages $6,000 for students, even at…

  12. Scheduling for Responsive Grids

    CERN Document Server

    Germain-Renaud, C; Moscicki,JT; Texier, R

    2008-01-01

    Grids are facing the challenge of seamless integration of the Grid power into everyday use. One critical component for this integration is responsiveness, the capacity to support on-demand computing and interactivity. Grid scheduling is involved at two levels in order to provide responsiveness: the policy level and the implementation level. The main contributions of this paper are as follows. First, we present a detailed analysis of the performance of the EGEE Grid with respect to responsiveness. Second, we examine two user-level schedulers located between the general scheduling layer and the application layer. These are the DIANE (distributed analysis environment) framework, a general-purpose overlay system, and a specialized, embedded scheduler for gPTM3D, an interactive medical image analysis application. Finally, we define and demonstrate a virtualization scheme, which achieves guaranteed turnaround time, schedulability analysis, and provides the basis for differentiated services. Both methods target a br...

  13. Concept of Indoor 3D-Route UAV Scheduling System

    DEFF Research Database (Denmark)

    Khosiawan, Yohanes; Nielsen, Izabela Ewa; Do, Ngoc Ang Dung

    2016-01-01

    The objective of the proposed concept is to develop a methodology to support Unmanned Aerial Vehicles (UAVs) operation with a path planning and scheduling system in 3D environments. The proposed 3D path-planning and scheduling allows the system to schedule UAVs routing to perform tasks in 3D indoor...... environment. On top of that, the multi-source productive best-first-search concept also supports efficient real-time scheduling in response to uncertain events. Without human intervention, the proposed work provides an automatic scheduling system for UAV routing problem in 3D indoor environment....

  14. Concept of Indoor 3D-Route UAV Scheduling System

    DEFF Research Database (Denmark)

    Khosiawan, Yohanes; Nielsen, Izabela Ewa; Do, Ngoc Ang Dung;

    2016-01-01

    environment. On top of that, the multi-source productive best-first-search concept also supports efficient real-time scheduling in response to uncertain events. Without human intervention, the proposed work provides an automatic scheduling system for UAV routing problem in 3D indoor environment.......The objective of the proposed concept is to develop a methodology to support Unmanned Aerial Vehicles (UAVs) operation with a path planning and scheduling system in 3D environments. The proposed 3D path-planning and scheduling allows the system to schedule UAVs routing to perform tasks in 3D indoor...

  15. LDRD Report: Scheduling Irregular Algorithms

    Energy Technology Data Exchange (ETDEWEB)

    Boman, Erik G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-10-01

    This LDRD project was a campus exec fellowship to fund (in part) Donald Nguyen’s PhD research at UT-Austin. His work has focused on parallel programming models, and scheduling irregular algorithms on shared-memory systems using the Galois framework. Galois provides a simple but powerful way for users and applications to automatically obtain good parallel performance using certain supported data containers. The naïve user can write serial code, while advanced users can optimize performance by advanced features, such as specifying the scheduling policy. Galois was used to parallelize two sparse matrix reordering schemes: RCM and Sloan. Such reordering is important in high-performance computing to obtain better data locality and thus reduce run times.

  16. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    drivers commuting to work in the morning in central Stockholm. The survey contains observations of choices between car and public transport travel alternatives, which differ in terms of departure time, monetary cost, and the distribution of travel time. We develop a discrete choice model to describe......-affine specifications to two benchmarks: The generalised exponential-exponential specification and the conventional α-β-γ specification. As could be expected, exponential preferences are difficult to estimate: The estimated parameters of H and W have large standard errors, and some types of models exhibit severe...

  17. Effects of Block Scheduling

    Directory of Open Access Journals (Sweden)

    William R. Veal

    1999-09-01

    Full Text Available This study examined the effects of a tri-schedule on the academic achievement of students in a high school. The tri-schedule consists of traditional, 4x4 block, and hybrid schedules running at the same time in the same high school. Effectiveness of the schedules was determined from the state mandated test of basic skills in reading, language, and mathematics. Students who were in a particular schedule their freshman year were tested at the beginning of their sophomore year. A statistical ANCOVA test was performed using the schedule types as independent variables and cognitive skill index and GPA as covariates. For reading and language, there was no statistically significant difference in test results. There was a statistical difference mathematics-computation. Block mathematics is an ideal format for obtaining more credits in mathematics, but the block format does little for mathematics achievement and conceptual understanding. The results have content specific implications for schools, administrations, and school boards who are considering block scheduling adoption.

  18. Use of Data Mining in Scheduler Optimization

    CERN Document Server

    Anderson, George; Nelwamondo, Fulufhelo V

    2010-01-01

    The operating system's role in a computer system is to manage the various resources. One of these resources is the Central Processing Unit. It is managed by a component of the operating system called the CPU scheduler. Schedulers are optimized for typical workloads expected to run on the platform. However, a single scheduler may not be appropriate for all workloads. That is, a scheduler may schedule a workload such that the completion time is minimized, but when another type of workload is run on the platform, scheduling and therefore completion time will not be optimal; a different scheduling algorithm, or a different set of parameters, may work better. Several approaches to solving this problem have been proposed. The objective of this survey is to summarize the approaches based on data mining, which are available in the literature. In addition to solutions that can be directly utilized for solving this problem, we are interested in data mining research in related areas that have potential for use in operat...

  19. Low-dose memantine induced working memory improvement in the allothetic place avoidance alternation task (APAAT in young adult male rats.

    Directory of Open Access Journals (Sweden)

    Malgorzata Julita Wesierska

    2013-12-01

    Full Text Available N-methyl-D-aspartate receptors (NMDAR are involved in neuronal plasticity. To assess their role simultaneously in spatial working memory and non-cognitive learning, we used NMDAR antagonists and the Allothetic Place Avoidance Alternation Task (APAAT. In this test rats should avoid entering a place where shocks were presented on a rotating arena which requires cognitive coordination for the segregation of stimuli. The experiment took place 30 min after intraperitoneal injection of memantine (5; 10; 20 mg/kg b.w.: MemL, MemM, MemH respectively and (+MK-801 (0.1; 0.2; 0.3 mg/kg b.w.: MK-801L, MK-801M, MK-801H respectively. Rats from the control group were intact or injected with saline (0.2 ml/kg. Over three consecutive days the rats underwent habituation, two avoidance training intervals with shocks, and a retrieval test. The shock sector was alternated daily. The after-effects of the agents were tested on Day21. Rats treated with low dose memantine presented a longer maximum time avoided and fewer entrances than the MemH, MK-801M, MK-801H and Control rats. The shocks per entrances ratio, used as an index of cognitive skill learning, showed skill improvement after D1, except for rats treated by high doses of the agents. The activity levels, indicated by the distance walked, were higher for the groups treated with high doses of the agents. On D21 the MK801H rats performed the memory task better than the MemH rats, whereas the rats’ activity depended on condition, not on the group factor. These results suggest that in naïve rats mild NMDAR blockade by low-dose memantine improves working memory related to a highly challenging task.

  20. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  1. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  2. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  3. CERN confirms LHC schedule

    CERN Multimedia

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  4. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  5. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  6. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  7. A SYNCHRONIZED PROCESS BASED SCHEDULING TO IMPROVE MAP/REDUCE EXECUTION STRATEGY

    Directory of Open Access Journals (Sweden)

    N. Barathi

    2014-11-01

    Full Text Available MapReduce is a widely used parallel computing framework for large scale data processing. The two major performance metrics in MapReduce are job execution time and cluster throughput. They can be seriously impacted by straggler machines. Speculative execution is a common approach for dealing with the straggler problem by simply backing up those slow running tasks on alternative machines. To improve speculative execution strategies MCP (Maximum Cost Performance can identify slow task and EWMA (Exponentially Weighted Moving Average to predict process speed and calculate task completion time. Multiple speculative execution strategies have been proposed, but there is a pitfall: incoming jobs are allocated to nodes present in server and fail to schedule process type allocate to node for processing. To overcome this process we proposed a new scheduling based speculative execution strategy. For scheduling we first calculate number of name node residing in server, minimum threshold of resources allocated to name node. We use minimum to avoid huge interaction among the name node when the competition for resources arises. To choose a proper work node for computing the task, we take both time scheduling and ability of work node to compute the task.

  8. A SYNCHRONIZED PROCESS BASED SCHEDULING TO IMPROVE MAP/REDUCE EXECUTION STRATEGY

    Directory of Open Access Journals (Sweden)

    N. Barathi

    2015-10-01

    Full Text Available MapReduce is a widely used parallel computing framework for large scale data processing. The two major performance metrics in MapReduce are job execution time and cluster throughput. They can be seriously impacted by straggler machines. Speculative execution is a common approach for dealing with the straggler problem by simply backing up those slow running tasks on alternative machines. To improve speculative execution strategies MCP (Maximum Cost Performance can identify slow task and EWMA (Exponentially Weighted Moving Average to predict process speed and calculate task completion time. Multiple speculative execution strategies have been proposed, but there is a pitfall: incoming jobs are allocated to nodes present in server and fail to schedule process type allocate to node for processing. To overcome this process we proposed a new scheduling based speculative execution strategy. For scheduling we first calculate number of name node residing in server, minimum threshold of resources allocated to name node. We use minimum to avoid huge interaction among the name node when the competition for resources arises. To choose a proper work node for computing the task, we take both time scheduling and ability of work node to compute the task.

  9. Feedback Scheduling of Priority-Driven Control Networks

    CERN Document Server

    Xia, Feng; Tian, Yu-Chu

    2008-01-01

    With traditional open-loop scheduling of network resources, the quality-of-control (QoC) of networked control systems (NCSs) may degrade significantly in the presence of limited bandwidth and variable workload. The goal of this work is to maximize the overall QoC of NCSs through dynamically allocating available network bandwidth. Based on codesign of control and scheduling, an integrated feedback scheduler is developed to enable flexible QoC management in dynamic environments. It encompasses a cascaded feedback scheduling module for sampling period adjustment and a direct feedback scheduling module for priority modification. The inherent characteristics of priority-driven control networks make it feasible to implement the proposed feedback scheduler in real-world systems. Extensive simulations show that the proposed approach leads to significant QoC improvement over the traditional open-loop scheduling scheme under both underloaded and overloaded network conditions.

  10. The robust schedule - A link to improved workflow

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    In today’s construction, there is a paramount focus on time, and on the scheduling and control of time. Everything is organized with respect to time. The construction project has to be completed within a fixed and often tight deadline. Otherwise a daily penalty often has to be paid. This pin......-down the contractors, and force them to rigorously adhere to the initial schedule. If delayed the work-pace or manpower has to be increased to observe the schedule. In attempt to improve productivity three independent site-mangers have been interviewed about time-scheduling. Their experiences and opinions have been...... analyzed and weaknesses in existing time scheduling have been found. The findings showed a negative side effect of keeping the schedule to tight. A too tight schedule is inflexible and cannot absorb variability in production. Flexibility is necessary because of the contractors interacting and dependable...

  11. A TQCS-based Scheduling Approach for Manufacturing Grid

    Institute of Scientific and Technical Information of China (English)

    LIU Li-lan; YU Tao; CAO Hong-wu; SHI Zhan-bei

    2004-01-01

    With Open Grid Service Architecture (OGSA) as system framework, and Globus Toolkit3.0 (GT3) as developing tools, Manufacturing Grid (MG) is proposed in this research to realize resource sharing and collaborative working among manufacturing resources, and task scheduling is one of the most critical components in this system. Nevertheless, the Globus Resource Allocation Manager (GRAM) does not provide scheduling system by default, and traditional performance-guided or economy-guided schedulers cannot satisfy our needs in MG. So, in this paper, a TQCS (Time, Quality, Cost, Service)-based scheduling approach is presented and the corresponding scheduler (Manufacturing Grid Task Scheduler, MGTS) is implemented with the functions of Global Process Planning (GPP) analyzing, resource discovery, resource selection, AHP (Analytic Hierarchy Process)-based resource mapping, and fault-tolerant handling. Furthermore, the application architecture is depicted at the end of the paper to illustrate the utilization of our scheduler.

  12. PAR Loop Schedule Review

    Energy Technology Data Exchange (ETDEWEB)

    Schaffer, Jr.; W.F.

    1958-04-30

    The schedule for the installation of the PAR slurry loop experiment in the South Facility of the ORR has been reviewed and revised. The design, fabrications and Installation is approximately two weeks behind schedule at this time due to many factors; however, indications are that this time can be made up. Design is estimated to be 75% complete, fabrication 32% complete and installation 12% complete.

  13. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  14. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    Science.gov (United States)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  15. Conception of Self-Construction Production Scheduling System

    Science.gov (United States)

    Xue, Hai; Zhang, Xuerui; Shimizu, Yasuhiro; Fujimura, Shigeru

    With the high speed innovation of information technology, many production scheduling systems have been developed. However, a lot of customization according to individual production environment is required, and then a large investment for development and maintenance is indispensable. Therefore now the direction to construct scheduling systems should be changed. The final objective of this research aims at developing a system which is built by it extracting the scheduling technique automatically through the daily production scheduling work, so that an investment will be reduced. This extraction mechanism should be applied for various production processes for the interoperability. Using the master information extracted by the system, production scheduling operators can be supported to accelerate the production scheduling work easily and accurately without any restriction of scheduling operations. By installing this extraction mechanism, it is easy to introduce scheduling system without a lot of expense for customization. In this paper, at first a model for expressing a scheduling problem is proposed. Then the guideline to extract the scheduling information and use the extracted information is shown and some applied functions are also proposed based on it.

  16. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  17. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  18. Force dynamics in fixed-ratio schedules.

    Science.gov (United States)

    Pinkston, Jonathan W; McBee, Lindsey N

    2014-03-01

    Fixed-ratio schedules are widely used in behavioral research. Although fixed-ratio schedules often conjure up relationships to work and effort, little is known about effort-related measures in these schedules. Early research had shown that force and effort of operant behavior vary systematically during the execution of ratio schedules, and the goal of the present study was to revisit early research on force dynamics in fixed-ratio schedules. Four rats earned sucrose by pressing an isometric force transducer. Presses produced sucrose after ten or twenty responses. In general, the force of responses increased then decreased systematically across the ratio. The possibility that decreases in force during ratio execution was due to a trade-off with the differential reinforcement of short inter-response times (IRT) was investigated in an additional condition where sucrose was made available according to a tandem fixed-ratio 19 inter-response (IRT)> t schedule. The tandem IRT requirement did not eliminate decreasing trends in force across the ratio; unexpectedly, the tandem requirement did eliminate increases in force early in the ratio, which may reflect sequence-level organization operating in the control of force dynamics.

  19. ALGORITHMIC CONSTRUCTION SCHEDULES IN CONDITIONS OF TIMING CONSTRAINTS

    Directory of Open Access Journals (Sweden)

    Alexey S. Dobrynin

    2014-01-01

    Full Text Available Tasks of time-schedule construction (JSSP in various fields of human activities have an important theoretical and practical significance. The main feature of these tasks is a timing requirement, describing allowed planning time periods and periods of downtime. This article describes implementation variations of the work scheduling algorithm under timing requirements for the tasks of industrial time-schedules construction, and service activities.

  20. Estimating demand schedules in hedonic analysis

    DEFF Research Database (Denmark)

    Panduro, Toke Emil; Jensen, Cathrine Ulla; Lundhede, Thomas;

    The hedonic pricing method has been used extensively to obtain implicit prices for availability of urban green space, but few hedonic studies have obtained households’ preference parameters. We estimate willingness to pay functions for park availability in Copenhagen using an approach that places...... an alternative path for estimation of demand schedules for public goods using hedonic data. The findings also stress the importance of paying attention to how public goods are defined when undertaking welfare economic policy analyses....

  1. An assessment of a days off decomposition approach to personnel scheduling

    NARCIS (Netherlands)

    Veldhoven, van Sophie; Post, Gerhard; Veen, van der Egbert; Curtois, Tim

    2013-01-01

    This paper studies a two-phase decomposition approach to solve the personnel scheduling problem. The first phase creates a days off schedule, indicating working days and days off for each employee. The second phase assigns shifts to the working days in the days off schedule. This decomposition is mo

  2. An assessment of a days off decomposition approach to personnel shift scheduling

    NARCIS (Netherlands)

    Veldhoven, van Sophie; Post, Gerhard; Veen, van der Egbert; Curtois, Tim

    2016-01-01

    This paper studies a two-phase decomposition approach to solving the personnel scheduling problem. The first phase creates a days-off-schedule, indicating working days and days off for each employee. The second phase assigns shifts to the working days in the days-off-schedule. This decomposition is

  3. Research on grading scheduling model of flexible job distributed work-shop%面向柔性作业分布式车间的分层调度模型研究

    Institute of Scientific and Technical Information of China (English)

    杨江波; 陈友玲; 曹楠

    2014-01-01

    针对多车间分布式制造系统调度优化问题,结合车间实际生产情况,提出一种基于目标级联法和遗传算法的层次调度模型。模型将生产调度过程划分为生产计划层、车间调度层和零件规划层,并将整体时间最短的优化目标划分到各个层次,通过层层优化达到时间最优后反馈至上层,以实现整体调度时间最优。以3个制造车间协调调度问题为例,验证了该模型在零件分配和零件的工艺路线选择上的合理性和有效性。%Aiming at the workshop distributed manufacturing system scheduling optimization problems, combined with the actual production situation, a hierarchical scheduling model based on analytical target cascading and genetic algo-rithms is proposed. The model divides the scheduling process into three parts:the planning layer, the workshop scheduling layer and the job planning layer, the whole time minimal as its target is divided into various levels, to achieve the overall optimal scheduling time. Taking a three job-shop system as an example to verify the proposed model could be used in jobs allocation and program the path of each job.

  4. Seal design alternatives study

    Energy Technology Data Exchange (ETDEWEB)

    Van Sambeek, L.L. [RE/SPEC Inc., Rapid City, SD (US); Luo, D.D.; Lin, M.S.; Ostrowski, W.; Oyenuga, D. [Parsons Brinckerhoff Quade & Douglas, Inc., San Francisco, CA (US)

    1993-06-01

    This report presents the results from a study of various sealing alternatives for the WIPP sealing system. Overall, the sealing system has the purpose of reducing to the extent possible the potential for fluids (either gas or liquid) from entering or leaving the repository. The sealing system is divided into three subsystems: drift and panel seals within the repository horizon, shaft seals in each of the four shafts, and borehole seals. Alternatives to the baseline configuration for the WIPP seal system design included evaluating different geometries and schedules for seal component installations and the use of different materials for seal components. Order-of-magnitude costs for the various alternatives were prepared as part of the study. Firm recommendations are not presented, but the advantages and disadvantages of the alternatives are discussed. Technical information deficiencies are identified and studies are outlined which can provide required information.

  5. Developing scheduling benchmark tests for the Space Network

    Science.gov (United States)

    Moe, Karen L.; Happell, Nadine; Brady, Sean

    1993-01-01

    A set of benchmark tests were developed to analyze and measure Space Network scheduling characteristics and to assess the potential benefits of a proposed flexible scheduling concept. This paper discusses the role of the benchmark tests in evaluating alternative flexible scheduling approaches and defines a set of performance measurements. The paper describes the rationale for the benchmark tests as well as the benchmark components, which include models of the Tracking and Data Relay Satellite (TDRS), mission spacecraft, their orbital data, and flexible requests for communication services. Parameters which vary in the tests address the degree of request flexibility, the request resource load, and the number of events to schedule. Test results are evaluated based on time to process and schedule quality. Preliminary results and lessons learned are addressed.

  6. Job Scheduling with Efficient Resource Monitoring in Cloud Datacenter

    Directory of Open Access Journals (Sweden)

    Shyamala Loganathan

    2015-01-01

    Full Text Available Cloud computing is an on-demand computing model, which uses virtualization technology to provide cloud resources to users in the form of virtual machines through internet. Being an adaptable technology, cloud computing is an excellent alternative for organizations for forming their own private cloud. Since the resources are limited in these private clouds maximizing the utilization of resources and giving the guaranteed service for the user are the ultimate goal. For that, efficient scheduling is needed. This research reports on an efficient data structure for resource management and resource scheduling technique in a private cloud environment and discusses a cloud model. The proposed scheduling algorithm considers the types of jobs and the resource availability in its scheduling decision. Finally, we conducted simulations using CloudSim and compared our algorithm with other existing methods, like V-MCT and priority scheduling algorithms.

  7. Job Scheduling with Efficient Resource Monitoring in Cloud Datacenter.

    Science.gov (United States)

    Loganathan, Shyamala; Mukherjee, Saswati

    2015-01-01

    Cloud computing is an on-demand computing model, which uses virtualization technology to provide cloud resources to users in the form of virtual machines through internet. Being an adaptable technology, cloud computing is an excellent alternative for organizations for forming their own private cloud. Since the resources are limited in these private clouds maximizing the utilization of resources and giving the guaranteed service for the user are the ultimate goal. For that, efficient scheduling is needed. This research reports on an efficient data structure for resource management and resource scheduling technique in a private cloud environment and discusses a cloud model. The proposed scheduling algorithm considers the types of jobs and the resource availability in its scheduling decision. Finally, we conducted simulations using CloudSim and compared our algorithm with other existing methods, like V-MCT and priority scheduling algorithms.

  8. Design and Implementation of a Two Level Scheduler for HADOOP Data Grids

    Directory of Open Access Journals (Sweden)

    Dr G. Sudha sadhasivam

    2010-03-01

    Full Text Available Hadoop is a large scale distributed processing infrastructure designed to handle data intensive applications. In a commercial large scale cluster framework, a scheduler distributes user jobs evenly among the cluster resources. The proposed work enhances Hadoop’s fair scheduler that queues the jobs for execution in a fine grained manner using task scheduling. In contrast, the proposed approach allows backfilling ofjobs submitted to the scheduler. Thus job level and task level scheduling is enabled by this approach. The jobs are fairly scheduled with fairness among users, pools and priority. The outcome of the proposed work is that short narrow jobs will be executed in the slot if sufficient resource is not available for larger jobs. Thus shorter jobs get executed faster by the scheduler when compared to the existing fair scheduling policy that schedules tasks based on their fairness of remaining execution time. This approach prevents the starvation of smaller jobs if sufficient resources are available.

  9. Scheduling IT Staff at a Bank: A Mathematical Programming Approach

    Directory of Open Access Journals (Sweden)

    M. Labidi

    2014-01-01

    Full Text Available We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules.

  10. Job shop scheduling problem based on DNA computing

    Institute of Scientific and Technical Information of China (English)

    Yin Zhixiang; Cui Jianzhong; Yang Yan; Ma Ying

    2006-01-01

    To solve job shop scheduling problem, a new approach-DNA computing is used in solving job shop scheduling problem. The approach using DNA computing to solve job shop scheduling is divided into three stands. Finally, optimum solutions are obtained by sequencing. A small job shop scheduling problem is solved in DNA computing, and the "operations" of the computation were performed with standard protocols, as ligation, synthesis, electrophoresis etc. This work represents further evidence for the ability of DNA computing to solve NP-complete search problems.

  11. How do employees prioritise when they schedule their own shifts?

    DEFF Research Database (Denmark)

    Nabe-Nielsen, Kirsten; Lund, Henrik; Hansen, Åse Marie

    2013-01-01

    of self-scheduling (n = 317). Intervention group participants were asked about their priorities when scheduling their own shifts succeeded by 17 items covering family/private life, economy, job content, health and sleep. At least half of the participants reported that they were giving high priority...... to their family life, having consecutive time off, leisure-time activities, rest between shifts, sleep, regularity of their everyday life, health and that the work schedule balanced. Thus, employees consider both their own and the workplace's needs when they have the opportunity to schedule their own shifts. Age...

  12. Class Schedules--Computer Loaded or Student Self-Scheduled?

    Science.gov (United States)

    Wall, Edward F.

    1979-01-01

    In the two-step process of student scheduling, the initial phase of course selection is the most important. At Chesterton High School in Indiana, student self-scheduling is preferred over computer loading. (Author/MLF)

  13. Realization of a Quantum Scheduling Algorithm Using Nuclear Magnetic Resonance

    Institute of Scientific and Technical Information of China (English)

    ZHANG Jing-Fu; DENG Zhi-Wei; PAN Yan-Na; LU Zhi-Heng

    2004-01-01

    The quantum scheduling algorithm proposed by Grover is generalized to extend its scope of applications. The generalized algorithm proposed here is realized on a nuclear magnetic resonance quantum computer. The experimental results show that the generalized algorithm can work efficiently in the case that Grover's scheduling algorithm is completely invalid, and represent the quantum advantages when qubits replace classical bits.

  14. Staff Scheduling within the Retail Business in Denmark

    DEFF Research Database (Denmark)

    Leedgaard, Jesper; Mortensen, Kim H.; Larsen, Allan

    2002-01-01

    Staff Scheduling within the retail business deals with the assignment of employees such as shop assistants to work tasks so that the right number of employees are available at any given times and the total staff costs are minimized. In this paper the retail staff scheduling problem is formulated...

  15. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms, l

  16. Childhood Vaccine Schedule

    Science.gov (United States)

    Skip Navigation Bar Home Current Issue Past Issues Childhood Vaccine Schedule Past Issues / Spring 2008 Table of Contents ... as pneumonia, blood infections, and bacterial meningitis Rotavirus vaccine (three ... in babies and young children 4 Months DTaP, Hib, IPV, PCV, RV 6 ...

  17. Round Robin Schedules.

    Science.gov (United States)

    Iannone, Michael A.

    1983-01-01

    Presented is a computer program written in BASIC that covers round-robin schedules for team matches in competitions. The program was originally created to help teams in a tennis league play one match against every other team. Part of the creation of the program involved use of modulo arithmetic. (MP)

  18. Personnel Scheduling in Laboratories

    NARCIS (Netherlands)

    Franses, Philip; Post, Gerhard; Burke, Edmund; De Causmaecker, Patrick

    2003-01-01

    We describe an assignment problem particular to the personnel scheduling of organisations such as laboratories. Here we have to assign tasks to employees. We focus on the situation where this assignment problem reduces to constructing maximal matchings in a set of interrelated bipartite graphs. We d

  19. Model Migration Schedules

    OpenAIRE

    1981-01-01

    This report draws on the fundamental regularity exhibited by age profiles of migration all over the world to develop a system of hypothetical model schedules that can be used in multiregional population analyses carried out in countries that lack adequate migration data.

  20. From schedule push to reality pull

    NARCIS (Netherlands)

    Reep, Frans van der

    2009-01-01

    The Internet is changing the way we organise work. It is shifting the requirement for what we call the ‘schedule push’ and the hierarchical organisation that it implies, and therefore it is removing the type of control that is conventionally used to match resources to tasks, and customer demand to s

  1. ALGORITHM FOR SOLVING EXTREME SCHEDULING PROBLEMS

    OpenAIRE

    Gennady A. Berketov

    2015-01-01

    The article considers the original algorithmfor solving the generalized problem ofscheduling theory, based on the branch and bound method. Task schedulingperform works (operations) and restrictions on resources used often occur with scheduling discrete manufacturing operations, optimizing network implementationschedules of scientific, economic or technical projects. Tools to solve suchproblems are included in the decisionsupport system ACS in many businesses.The effectiveness of the proposed ...

  2. The robust schedule - a link to improved workflow

    DEFF Research Database (Denmark)

    Lindhard, Søren Munch; Wandahl, Søren

    2012-01-01

    In today’s construction, there is a paramount focus on time, and on the scheduling and control of time. Everything is organized with respect to time. The construction project has to be completed within a fixed and often tight deadline. Otherwise a daily penalty often has to be paid. This pins down...... the contractors, and forces them to rigorously adhere to the initial schedule. If delayed the work-pace or manpower has to be increased to observe the schedule. In an attempt to improve productivity, three independent site-mangers have been interviewed about time-scheduling. Their experiences and opinions have...... been analyzed and weaknesses in existing time scheduling have been found. The findings showed a negative side effect of keeping the schedule too tight as it becomes inflexible and cannot absorb variability in production. Flexibility is necessary because of the contractors’ interacting and dependent...

  3. Where do we stand with fuzzy project scheduling?

    CERN Document Server

    Bonnal, Pierre; Lacoste, Germain

    2004-01-01

    Fuzzy project scheduling has interested several researchers in the past two decades; about 20 articles have been written on this issue. Contrary to stochastic project-scheduling approaches that are used by many project schedulers, and even if the axiomatic associated to the theory of probabilities is not always compatible with decision-making situations, fuzzy project-scheduling approaches that are most suited to these situations have been kept in the academic sphere. This paper starts by recalling the differences one can observe between uncertainty and imprecision. Then most of the published research works that have been done in this field are summarized. Finally, a framework for addressing the resource-constrained fuzzy project- scheduling problem is proposed. This framework uses temporal linguistic descriptors, which might become very interesting features to the project-scheduling practitioners.

  4. A reduced feedback proportional fair multiuser scheduling scheme

    KAUST Repository

    Shaqfeh, Mohammad

    2011-12-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed and ordered scheduling mechanism. A slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we propose a novel proportional fair multiuser switched-diversity scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the per-user feedback thresholds. We demonstrate by numerical examples that our reduced feedback proportional fair scheduler operates within 0.3 bits/sec/Hz from the achievable rates by the conventional full feedback proportional fair scheduler in Rayleigh fading conditions. © 2011 IEEE.

  5. The Effective Research of Implementing Talents' Training Mode with Work-study Alternation%工学交替人才培养模式实施的有效性研究

    Institute of Scientific and Technical Information of China (English)

    史金虎

    2012-01-01

    Talents' training mode with work-study alternation is one talents' training mode to complement alternation of study and work practice.Higher vocational education in five years can make full use of the characteristics of educational system,effectively driving the practice of work-study alternation,which plays an important role in cultivating eligible applicable talents.%工学交替人才培养模式是学习和工作实践交替进行的一种人才培养模式。五年制高职教育可充分利用学制特点,有效推动工学交替的实践,对培养合格的实用型人才具有重要的意义。

  6. Les effets conjoints du travail et des horaires alternants sur la santé des agents de surveillance des établissements pénitentiaires The effects of work content and working hours on the health of prison guards Los efectos combinados del trabajo y de los horarios alternantes sobre la salud de los guardianes de cárceles en los establecimientos penitenciarios

    Directory of Open Access Journals (Sweden)

    Pierre Pavageau

    2006-10-01

    Full Text Available Les préoccupations en santé publique révèlent le peu Notre étude vise à comparer les effets sur la santé de trois formes d’organisation temporelle (horaires traditionnels, factions de 6 heures et de 12 heures au sein d’établissements pénitentiaires français, et plus particulièrement auprès des personnels de surveillance. Des moyens d’investigation complémentaires (questionnaire, observations du travail, traitement statistique ont été mis en œuvre pour tenter de faire la part entre le poids des horaires et le poids du travail sur l’état de santé des agents. Si les personnels en factions de 12 heures présentent des résultats meilleurs que les personnels en 6 heures, c’est en particulier dû à des avantages dans la vie extra-professionnelle, bien que des signes certains de fatigue ne permettent pas de conclure significativement en faveur de telles modalités. Au-delà de l’alternance des horaires, le contenu du travail pèse de manière importante sur la santé des agents.The aim of our study is to compare the effects of three different forms of time organization (traditional 9 to 5 schedule, 6-hour shifts, and 12-hour shifts inside French prisons, and particularly on prison guard staff. Complementary means of investigation (questionnaire, work observations, statistical treatment were used to attempt to evaluate the difference between the effect of working hours and of the actual work on the guards’ health. Staff who worked 12-hour shifts had more positive results than staff who worked 6-hour shifts. This was mainly due to the advantages in their private lives. At the same time, some signs of fatigue prevent us from conclusively favouring this type of working rhythm. Beyond the alternation of schedules, the actual work content also has an important impact on the workers’ health.Nuestro estudio pretende comparar los efectos sobre la salud de tres formas de organización temporal (horarios tradicionales, turnos de

  7. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo [Technical Univ. of Lisbon (Portugal); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Center for Energy and Innovation Technologies (Austria); Bozchalui, Mohammed C. [NEC Laboratories American Inc., Irving, TX (United States); Sharma, Ratnesh [NEC Laboratories American Inc., Irving, TX (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbosa-Povoa, Ana [Technical Univ. of Lisbon (Portugal); Ferrao, Paulo [Technical Univ. of Lisbon (Portugal)

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  8. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...

  9. Scheduling support for transactional memory contention management

    DEFF Research Database (Denmark)

    Maldonado, Walther; Marler, Patrick; Felber, Pascal

    2010-01-01

    Transactional Memory (TM) is considered as one of the most promising paradigms for developing concurrent applications. TM has been shown to scale well on >multiple cores when the data access pattern behaves "well," i.e., when few conflicts are induced. In contrast, data patterns with frequent write......-management has been proposed for increasing TM efficiency under high-contention [2, 5, 19]. However, only user-level schedulers have been considered. In this work, we propose, implement and evaluate several novel kernel-level scheduling support mechanisms for TM contention management. We also investigate...... kernels. Our experimental evaluation demonstrates that lightweight kernel-level scheduling support significantly reduces the number of aborts while improving transaction throughput on various workloads....

  10. Gemcitabine and cisplatin in locally advanced and metastatic bladder cancer; 3- or 4-week schedule?

    DEFF Research Database (Denmark)

    Als, Anne Birgitte; Sengeløv, Lisa; Von Der Maase, Hans

    2008-01-01

    BACKGROUND: Chemotherapy with gemcitabine and cisplatin (GC) is an active regimen in advanced transitional cell carcinoma (TCC). Traditionally, GC has been administered as a 4-week schedule. However, an alternative 3-week schedule may be more feasible. Long-term survival data for the alternative 3...... intensity for gemcitabine was accordingly lower in the 4 week-schedule. The higher dose intensity of cisplatin in the 3-week schedule, did not lead to increased renal toxicity. In 13 patients with impaired renal function, cisplatin was split into 2 days, which was feasible and efficient. CONCLUSION...

  11. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  12. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  13. Continuous Media Tasks Scheduling Algorithm

    Directory of Open Access Journals (Sweden)

    Myungryun Yoo

    2016-03-01

    Full Text Available In this paper the authors propose modified proportional share scheduling algorithm considering the characteristics of continuous media such as its continuity and time dependency. Proposed scheduling algorithm shows graceful degradation of performance in overloaded situation and decreases the number of context switching. Proposed scheduling algorithm is evaluated using several numerical tests under various conditions, especially overloaded situation.

  14. Flexible Software for Flexible Scheduling

    Science.gov (United States)

    Economou, Frossie; Jenness, Tim; Tilanus, Remo P. J.; Hirst, Paul; Adamson, Andy J.; Rippa, Mathew; Delorey, Kynan K.; Isaak, Kate G.

    The JAC Observation Management Project (OMP) provides software for the James Clerk Maxwell (JCMT) and the United Kingdom Infrared (UKIRT) telescopes that manages the life-cycle of flexibly scheduled observations. Its aim is to increase observatory efficiency under flexible (queue) scheduled observing, without depriving the principal investigator (PI) of the flexibility associated with classical scheduling.

  15. Revisiting conjugate schedules.

    Science.gov (United States)

    MacAleese, Kenneth R; Ghezzi, Patrick M; Rapp, John T

    2015-07-01

    The effects of conjugate reinforcement on the responding of 13 college students were examined in three experiments. Conjugate reinforcement was provided via key presses that changed the clarity of pictures displayed on a computer monitor in a manner proportional to the rate of responding. Experiment 1, which included seven parameters of clarity change per response, revealed that responding decreased as the percentage clarity per response increased for all five participants. These results indicate that each participant's responding was sensitive to intensity change, which is a parameter of conjugate reinforcement schedules. Experiment 2 showed that responding increased during conjugate reinforcement phases and decreased during extinction phases for all four participants. Experiment 3 also showed that responding increased during conjugate reinforcement and further showed that responding decreased during a conjugate negative punishment condition for another four participants. Directions for future research with conjugate schedules are briefly discussed.

  16. Designing of Vague Logic Based 2-Layered Framework for CPU Scheduler

    Directory of Open Access Journals (Sweden)

    Supriya Raheja

    2016-01-01

    Full Text Available Fuzzy based CPU scheduler has become of great interest by operating system because of its ability to handle imprecise information associated with task. This paper introduces an extension to the fuzzy based round robin scheduler to a Vague Logic Based Round Robin (VBRR scheduler. VBRR scheduler works on 2-layered framework. At the first layer, scheduler has a vague inference system which has the ability to handle the impreciseness of task using vague logic. At the second layer, Vague Logic Based Round Robin (VBRR scheduling algorithm works to schedule the tasks. VBRR scheduler has the learning capability based on which scheduler adapts intelligently an optimum length for time quantum. An optimum time quantum reduces the overhead on scheduler by reducing the unnecessary context switches which lead to improve the overall performance of system. The work is simulated using MATLAB and compared with the conventional round robin scheduler and the other two fuzzy based approaches to CPU scheduler. Given simulation analysis and results prove the effectiveness and efficiency of VBRR scheduler.

  17. CMS Multicore Scheduling Strategy

    CERN Document Server

    Perez-Calero Yzquierdo, Antonio

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue Moores Law style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications. Also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multi-core jobs on the GRID based on the glideIn WMS submission infrastructure. We will present the individual components of the strategy, from special site specific queues used during provisioning of resources and implications to scheduling; to dynamic partitioning within a single pilot to allow to transition to multi-core or whole-node scheduling on site level without disallowing single-core jobs. In this presentation, we will present the experiences mad...

  18. CPU Scheduling Algorithms: A Survey

    Directory of Open Access Journals (Sweden)

    Imran Qureshi

    2014-01-01

    Full Text Available Scheduling is the fundamental function of operating system. For scheduling, resources of system shared among processes which are going to be executed. CPU scheduling is a technique by which processes are allocating to the CPU for a specific time quantum. In this paper the review of different scheduling algorithms are perform with different parameters, such as running time, burst time and waiting times etc. The reviews algorithms are first come first serve, Shortest Job First, Round Robin, and Priority scheduling algorithm.

  19. Visualization and Simulation in Scheduling

    Directory of Open Access Journals (Sweden)

    R. Čapek

    2008-01-01

    Full Text Available This paper deals with the representation of scheduling results and it introduces a new tool for visualization and simulation in time scheduling called VISIS. The purpose of this tool is to provide an environment for visualization, e.g. in production line scheduling. The simulation also proposes a way to simulate the influence of a schedule on a user defined system, e.g. for designing filters in digital signal processing. VISIS arises from representing scheduling results using the well-known Gantt chart. The application is implemented in the Matlab programming environment using Simulink and the Virtual Reality toolbox. 

  20. Alternative energies; Energies alternatives

    Energy Technology Data Exchange (ETDEWEB)

    Bonal, J.; Rossetti, P

    2007-07-01

    The earth took millions years to made the petroleum, the gas the coal and the uranium. Only a few centuries will be needed to exhaust these fossil fuels and some years to reach expensive prices. Will the wold continue on this way of energy compulsive consumption? The renewable energies and some citizen attitudes are sufficient to break this spiral. This book proposes to discuss these alternative energies. It shows that this attitude must be supported by the government. It takes stock on the more recent information concerning the renewable energies. it develops three main points: the electricity storage, the housing and the transports. (A.L.B.)

  1. Computerized Schedule Construction in College and University Physical Education Departments.

    Science.gov (United States)

    Hattlestad, Neil

    This paper describes the use of a computer in scheduling physical education classes and activities. The advantages of the computer are pointed out in terms of person hours of work saved for the school administrator. (JD)

  2. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  3. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Despite the holiday season affecting available manpower, many key internal milestones have been passed over the summer, thanks to the dedication and commitment of the team at point 5. In particular, the installation on, and within, YB0 has progressed steadily through several potentially difficult phases. The v36 planning contingency of lowering YB-1 and YB-1 wheels on schedule in October, before Tracker installation, will be executed in order to give more time to complete YB0 services work, whilst still being consistent with completion of heavy lowering by the end of 2007. Safety In the underground areas the peak level of activity and parallel work has been reached and this will continue for the coming months. Utmost vigilance is required of everybody working underground and this must be maintained. However, it is encouraging to note that the compliance with safety rules is, in general, good. More and more work will be carried out from scaffolding and mobile access platforms. (cherry-picke...

  4. On program restructuring, scheduling, and communication for parallel processor systems

    Energy Technology Data Exchange (ETDEWEB)

    Polychronopoulos, Constantine D.

    1986-08-01

    This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, these algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented. 69 refs., 74 figs., 14 tabs.

  5. Minimizing metastatic risk in radiotherapy fractionation schedules

    Science.gov (United States)

    Badri, Hamidreza; Ramakrishnan, Jagdish; Leder, Kevin

    2015-11-01

    Metastasis is the process by which cells from a primary tumor disperse and form new tumors at distant anatomical locations. The treatment and prevention of metastatic cancer remains an extremely challenging problem. This work introduces a novel biologically motivated objective function to the radiation optimization community that takes into account metastatic risk instead of the status of the primary tumor. In this work, we consider the problem of developing fractionated irradiation schedules that minimize production of metastatic cancer cells while keeping normal tissue damage below an acceptable level. A dynamic programming framework is utilized to determine the optimal fractionation scheme. We evaluated our approach on a breast cancer case using the heart and the lung as organs-at-risk (OAR). For small tumor α /β values, hypo-fractionated schedules were optimal, which is consistent with standard models. However, for relatively larger α /β values, we found the type of schedule depended on various parameters such as the time when metastatic risk was evaluated, the α /β values of the OARs, and the normal tissue sparing factors. Interestingly, in contrast to standard models, hypo-fractionated and semi-hypo-fractionated schedules (large initial doses with doses tapering off with time) were suggested even with large tumor α/β values. Numerical results indicate the potential for significant reduction in metastatic risk.

  6. Alternative additives; Alternative additiver

    Energy Technology Data Exchange (ETDEWEB)

    2007-08-15

    In this project a number of industrial and agricultural waste products have been characterised and evaluated in terms of alkali-getter performance. The intended use is for biomass-fired power stations aiming at reducing corrosion or slagging related problems. The following products have been obtained, characterised and evaluated: 1) Brewery draff 2) Danish de-gassed manure 3) Paper sludge 4) Moulding sand 5) Spent bleaching earth 6) Anorthosite 7) Sand 8) Clay-sludge. Most of the above alternative additive candidates are deemed unsuitable due to insufficient chemical effect and/or expensive requirements for pre-treatment (such as drying and transportation). 3 products were selected for full-scale testing: de-gassed manure, spent bleaching earth and clay slugde. The full scale tests were undertaken at the biomass-fired power stations in Koege, Slagelse and Ensted. Spent bleaching earth (SBE) and clay sludge were the only tested additive candidates that had a proven ability to react with KCl, to thereby reduce Cl-concentrations in deposits, and reduce the deposit flux to superheater tubes. Their performance was shown to nearly as good as commercial additives. De-gassed manure, however, did not evaluate positively due to inhibiting effects of Ca in the manure. Furthermore, de-gassed manure has a high concentration of heavy metals, which imposes a financial burden with regard to proper disposal of the ash by-products. Clay-sludge is a wet clay slurring, and drying and transportation of this product entails substantial costs. Spent bleaching does not require much pre-treatment and is therefore the most promising alternative additive. On the other hand, bleaching earth contains residual plant oil which means that a range of legislation relating to waste combustion comes into play. Not least a waste combustion fee of 330 DKK/tonne. For all alternative (and commercial) additives disposal costs of the increase ash by-products represents a significant cost. This is

  7. Application of a hybrid generation/utility assessment heuristic to a class of scheduling problems

    Science.gov (United States)

    Heyward, Ann O.

    1989-01-01

    A two-stage heuristic solution approach for a class of multiobjective, n-job, 1-machine scheduling problems is described. Minimization of job-to-job interference for n jobs is sought. The first stage generates alternative schedule sequences by interchanging pairs of schedule elements. The set of alternative sequences can represent nodes of a decision tree; each node is reached via decision to interchange job elements. The second stage selects the parent node for the next generation of alternative sequences through automated paired comparison of objective performance for all current nodes. An application of the heuristic approach to communications satellite systems planning is presented.

  8. Batch Scheduling of Recurrent Applications for Energy Savings on Mobile Phones

    OpenAIRE

    Marina, Mahesh; Calder, Matthew

    2010-01-01

    Recurrent applications that mostly run in the background are a significant source of power consumption on battery-limited mobile phones. We highlight the pitfalls of scheduling such applications independently without awareness of each other's schedules. We illustrate the significant energy savings that can be achieved via batch scheduling of recurrent mobile phone applications. We then present our on-going work on developing a general batch scheduling framework for such applications and also ...

  9. A study of the impact of scheduling parameters in heterogeneous computing environments

    Energy Technology Data Exchange (ETDEWEB)

    Powers, Sarah S [ORNL

    2014-01-01

    This paper describes a tool for exploring system scheduler parameter settings in a heterogeneous computing environment. Through the coupling of simulation and optimization techniques, this work investigates optimal scheduling intervals, the impact of job arrival prediction on scheduling, as well as how to best apply fair use policies. The developed simulation framework is quick and modular, enabling decision makers to further explore decisions in real-time regarding scheduling policies or parameter changes.

  10. SCHEDULING PROBLEMS-AN OVERVIEW

    Institute of Scientific and Technical Information of China (English)

    Asmuliardi MULUK; Hasan AKPOLAT; Jichao XU

    2003-01-01

    There seems to be a significant gap between the theoretical and the practical aspects of scheduling problems in the job shop environment. Theoretically, scheduling systems are designed on the basis of an optimum approach to the scheduling model. However in the practice, the optimum that is built into the scheduling applications seems to face some challenges when dealing with the dynamic character of a scheduling system, for instance machine breakdown or change of orders. Scheduling systems have become quite complex in the past few years. Competitive business environments and shorter product life cycles are the imminent challenges being faced by many companies these days.These challenges push companies to anticipate a demand driven supply chain in their business environment. A demand-driven supply chain incorporates the customer view into the supply chain processes. As a consequence of this, scheduling as a core process of the demand-driven supply chain must also reflect the customer view. In addition, other approaches to solving scheduling problems, for instance approaches based on human factors, prefer the scheduling system to be more flexible in both design and implementation. After discussion of these factors, the authors propose the integration of a different set of criteria for the development of scheduling systems which not only appears to have a better flexibility but also increased customer-focus.

  11. A GRASP for Next Generation Sapphire Image Acquisition Scheduling

    Directory of Open Access Journals (Sweden)

    Yang Wang

    2016-01-01

    Full Text Available This paper investigates an image acquisition scheduling problem for a Canadian surveillance-of-space satellite named Sapphire that takes images of deep space Earth-orbiting objects. For a set of resident space objects (RSOs that needs to be imaged within the time horizon of one day, the Sapphire image acquisition scheduling (SIAS problem is to find a schedule that maximizes the “Figure of Merit” of all the scheduled RSO images. To address the problem, we propose an effective GRASP heuristic that alternates between a randomized greedy constructive procedure and a local search procedure. Experimental comparisons with the currently used greedy algorithm are presented to demonstrate the merit of the proposed algorithm in handling the SIAS problem.

  12. Schedulability of Herschel revisited using statistical model checking

    DEFF Research Database (Denmark)

    David, Alexandre; Larsen, Kim Guldstrand; Legay, Axel

    2015-01-01

    Schedulability analysis is a main concern for several embedded applications due to their safety-critical nature. The classical method of response time analysis provides an efficient technique used in industrial practice. However, the method is based on conservative assumptions related to execution...... to obtain some guarantee on the (un)schedulability of the model even in the presence of undecidability. Two methods are considered: symbolic model checking and statistical model checking. Since the model uses stop-watches, the reachability problem becomes undecidable so we are using an over......-approximation technique. We can safely conclude that the system is schedulable for varying values of BCET. For the cases where deadlines are violated, we use polyhedra to try to confirm the witnesses. Our alternative method to confirm non-schedulability uses statistical model-checking (SMC) to generate counter...

  13. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  14. Further Evaluation of the Use of Multiple Schedules for Behavior Maintained by Negative Reinforcement.

    Science.gov (United States)

    Campos, Claudia; Leon, Yanerys; Sleiman, Andressa; Urcuyo, Beatriz

    2017-03-01

    One potential limitation of functional communication training (FCT) is that after the functional communication response (FCR) is taught, the response may be emitted at high rates or inappropriate times. Thus, schedule thinning is often necessary. Previous research has demonstrated that multiple schedules can facilitate schedule thinning by establishing discriminative control of the communication response while maintaining low rates of problem behavior. To date, most applied research evaluating the clinical utility of multiple schedules has done so in the context of behavior maintained by positive reinforcement (e.g., attention or tangible items). This study examined the use of a multiple schedule with alternating Fixed Ratio (FR 1)/extinction (EXT) components for two individuals with developmental disabilities who emitted escape-maintained problem behavior. Although problem behavior remained low during all FCT and multiple schedule phases, the use of the multiple schedule alone did not result in discriminated manding.

  15. Asymptotically Optimal Downlink Scheduling over Markovian Fading Channels

    CERN Document Server

    Ouyang, Wenzhuo; Shroff, Ness B

    2011-01-01

    We consider the scheduling problem in downlink wireless networks with heterogeneous, Markov-modulated, ON/OFF channels. It is well-known that the performance of scheduling over fading channels heavily depends on the accuracy of the available Channel State Information (CSI), which is costly to acquire. Thus, we consider the CSI acquisition via a practical ARQ-based feedback mechanism whereby channel states are revealed at the end of only scheduled users' transmissions. In the assumed presence of temporally-correlated channel evolutions, the desired scheduler must optimally balance the exploitation-exploration trade-off, whereby it schedules transmissions both to exploit those channels with up-to-date CSI and to explore the current state of those with outdated CSI. In earlier works, Whittle's Index Policy had been suggested as a low-complexity and high-performance solution to this problem. However, analyzing its performance in the typical scenario of statistically heterogeneous channel state processes has remai...

  16. Request-Driven Schedule Automation for the Deep Space Network

    Science.gov (United States)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol

    2010-01-01

    The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

  17. Behavioral momentum and accumulation of mass in multiple schedules.

    Science.gov (United States)

    Craig, Andrew R; Cunningham, Paul J; Shahan, Timothy A

    2015-05-01

    Behavioral momentum theory suggests that the relation between a discriminative-stimulus situation and reinforcers obtained in that context (i.e., the Pavlovian stimulus-reinforcer relation) governs persistence of operant behavior. Within the theory, a mass-like aspect of behavior has been shown to be a power function of predisruption reinforcement rates. Previous investigations of resistance to change in multiple schedules, however, have been restricted to examining response persistence following protracted periods of stability in reinforcer rates within a discriminative situation. Thus, it is unclear how long a stimulus-reinforcer relation must be in effect prior to disruption in order to affect resistance to change. The present experiment examined resistance to change of pigeon's key pecking following baseline conditions where reinforcer rates that were correlated with discriminative-stimulus situations changed. Across conditions, one multiple-schedule component arranged either relatively higher rates or lower rates of variable-interval food delivery, while the other component arranged the opposite rate. These schedules alternated between multiple-schedule components across blocks of sessions such that reinforcer rates in the components were held constant for 20, 5, 3, 2, or 1 session(s) between alternations. Resistance to extinction was higher in the component that most recently was associated with higher rates of food delivery in all conditions except when schedules alternated daily or every other day. These data suggest that resistance to change in multiple schedules is related to recently experienced reinforcer rates but only when multiple-schedule components are associated with specific reinforcer rates for several sessions.

  18. The LSST OCS scheduler design

    Science.gov (United States)

    Delgado, Francisco; Schumacher, German

    2014-08-01

    The Large Synoptic Survey Telescope (LSST) is a complex system of systems with demanding performance and operational requirements. The nature of its scientific goals requires a special Observatory Control System (OCS) and particularly a very specialized automatic Scheduler. The OCS Scheduler is an autonomous software component that drives the survey, selecting the detailed sequence of visits in real time, taking into account multiple science programs, the current external and internal conditions, and the history of observations. We have developed a SysML model for the OCS Scheduler that fits coherently in the OCS and LSST integrated model. We have also developed a prototype of the Scheduler that implements the scheduling algorithms in the simulation environment provided by the Operations Simulator, where the environment and the observatory are modeled with real weather data and detailed kinematics parameters. This paper expands on the Scheduler architecture and the proposed algorithms to achieve the survey goals.

  19. Littoral Combat Ship Crew Scheduling

    Science.gov (United States)

    2015-03-01

    package DON Department of the Navy F&R Fix and Relax GAMS General Algebraic Modeling System LCS Littoral Combat Ship LCSRON Littoral Combat Ship...but that can be acceptable depending on the scheduler needs. F&R produces superior long-term schedules when compared to a similar-length RH schedule...LEFT BLANK 29 IV. MODEL IMPLEMENTATION LCSS is implemented with the General Algebraic Modeling System (GAMS) using the GAMS/CPLEX (GAMS, 2014

  20. Software Schedules Missions, Aids Project Management

    Science.gov (United States)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  1. Cloud Task Scheduling for Load Balancing based on Intelligent Strategy

    Directory of Open Access Journals (Sweden)

    Arabi E. keshk

    2014-04-01

    Full Text Available Cloud computing is a type of parallel and distributed system consisting of a collection of interconnected and virtual computers. With the increasing demand and benefits of cloud computing infrastructure, different computing can be performed on cloud environment. One of the fundamental issues in this environment is related to task scheduling. Cloud task scheduling is an NP-hard optimization problem, and many meta-heuristic algorithms have been proposed to solve it. A good task scheduler should adapt its scheduling strategy to the changing environment and the types of tasks. In this paper a cloud task scheduling policy based on ant colony optimization algorithm for load balancing compared with different scheduling algorithms has been proposed. Ant Colony Optimization (ACO is random optimization search approach that will be used for allocating the incoming jobs to the virtual machines. The main contribution of our work is to balance the system load while trying to minimizing the make span of a given tasks set. The load balancing factor, related to the job finishing rate, is proposed to make the job finishing rate at different resource being similar and the ability of the load balancing will be improved. The proposed scheduling strategy was simulated using Cloudsim toolkit package. Experimental results showed that, the proposed algorithm outperformed scheduling algorithms that are based on the basic ACO or Modified Ant Colony Optimization (MACO.

  2. Advance Resource Provisioning in Bulk Data Scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Balman, Mehmet

    2012-10-01

    Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improve the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.

  3. A Component Analysis of Schedule Thinning during Functional Communication Training

    Science.gov (United States)

    Betz, Alison M.; Fisher, Wayne W.; Roane, Henry S.; Mintz, Joslyn C.; Owen, Todd M.

    2013-01-01

    One limitation of functional communication training (FCT) is that individuals may request reinforcement via the functional communication response (FCR) at exceedingly high rates. Multiple schedules with alternating periods of reinforcement and extinction of the FCR combined with gradually lengthening the extinction-component interval can…

  4. The Shrewsbury Plan: Flexible Scheduling/Extended Day. A Report.

    Science.gov (United States)

    Laplante, John Guy

    This publication describes the development and operation of the scheduling plan developed by the Shrewsbury, Massachusetts, school system. The plan, designed to maximize the use of available facilities and to expand the curriculum offering, combines a fifty-hour instructional week, alternative learning opportunities throughout the community, an…

  5. OUTLOOK ON VARIOUS SCHEDULING APPROACHES IN HADOOP

    Directory of Open Access Journals (Sweden)

    P. Amuthabala

    2016-02-01

    Full Text Available MapReduce is used for processing and generating sets large data .A open source framework of MapReduce is Hadoop [1]. MapReduce and Hadoop represent a good alternative for efficient large scale data processing and advanced analytics in an enterprise. In Heterogeneous computing, map or schedule a processor to a single core or different type of processors to a single core or a processor to many cores or many processors to many cores. So the usage of heterogeneous multi-core processors for the efficient performance in map reduce environments is increasing. Therefore the single heterogeneous multi-core processors consists of small and big cores where small cores provide power efficient and big-cores provide high-performance , which includes Inductive Logic Programming and Multilayer Perception to be extracted dynamically. This paper addresses various scheduling approaches that helps in improving the performance in heterogeneous environment. The outcome of this paper shows that traditional approaches used in Hadoop suffers from various issues. This paper will encourage in addressing those issues and discusses various scheduling approaches which helps in big data analysis.

  6. Family Roles as Moderators of the Relationship between Schedule Flexibility and Stress

    Science.gov (United States)

    Jang, Soo Jung; Zippay, Allison; Park, Rhokeun

    2012-01-01

    Employer initiatives that address the spillover of work strain onto family life include flexible work schedules. This study explored the mediating role of negative work-family spillover in the relationship between schedule flexibility and employee stress and the moderating roles of gender, family workload, and single-parent status. Data were drawn…

  7. Collaborative Work as an Alternative for Writing Research Articles (El trabajo colaborativo como alternativa para la escritura de artículos investigativos)

    Science.gov (United States)

    Carvajal Medina, Nancy Emilce; Roberto Flórez, Eliana Edith

    2014-01-01

    Academic writing in English in our context is a significant aspect that can be innovative when a convergence model of writing stages is used along with collaborative work. This article reports on a study aimed at analyzing how collaborative work relates to undergraduate electronics students' academic writing development in English as a foreign…

  8. "¡Todos Somos Indios!" Revolutionary Imagination, Alternative Modernity, and Transnational Organizing in the Work of Silko, Tamez, and Anzaldúa

    OpenAIRE

    Adamson, Joni

    2012-01-01

    This essay builds on Shari Huhndorf’s analysis of the “significant implications” of Leslie Marmon Silko’s Almanac of the Dead for Indigenous Studies by setting the novel into the context of María Josefina Saldaña-Portillo’s analysis of how Zapatista organizing activities in Chiapas, Mexico, reshaped the “revolutionary imagination in the Americas” and helped to construct an “alternative modernity” that disrupts the empty signifier of “authentic” indigenous identity. The essay juxtaposes Silko’...

  9. Improved Quantum Genetic Algorithm in Application of Scheduling Engineering Personnel

    Directory of Open Access Journals (Sweden)

    Huaixiao Wang

    2014-01-01

    Full Text Available To verify the availability of the improved quantum genetic algorithm in solving the scheduling engineering personnel problem, the following work has been carried out: the characteristics of the scheduling engineering personnel problem are analyzed, the quantum encoding method is proposed, and an improved quantum genetic algorithm is applied to address the issue. Taking the low efficiency and the bad performance of the conventional quantum genetic algorithm into account, a universal improved quantum genetic algorithm is introduced to solve the scheduling engineering personnel problem. Finally, the examples are applied to verify the effectiveness and superiority of the improved quantum genetic algorithm and the rationality of the encoding method.

  10. A distributed scheduling algorithm for heterogeneous real-time systems

    Science.gov (United States)

    Zeineldine, Osman; El-Toweissy, Mohamed; Mukkamala, Ravi

    1991-01-01

    Much of the previous work on load balancing and scheduling in distributed environments was concerned with homogeneous systems and homogeneous loads. Several of the results indicated that random policies are as effective as other more complex load allocation policies. The effects of heterogeneity on scheduling algorithms for hard real time systems is examined. A distributed scheduler specifically to handle heterogeneities in both nodes and node traffic is proposed. The performance of the algorithm is measured in terms of the percentage of jobs discarded. While a random task allocation is very sensitive to heterogeneities, the algorithm is shown to be robust to such non-uniformities in system components and load.

  11. Reinforcement and punishment effects in concurrent schedules: A test of two models

    OpenAIRE

    Farley, Joseph

    1980-01-01

    The joint effects of punishment and reinforcement on the pigeon's key-peck response were examined in three choice experiments conducted to compare predictions of Farley and Fantino's (1978) subtractive model with those made by Deluty's (1976) and Deluty and Church's (1978) model of punishment. In Experiment 1, the addition of equal punishment schedules to both alternatives of a concurrent reinforcement schedule enhanced the preference exhibited for the more frequent reinforcement alternative....

  12. Scheduling Broadcasts in a Network of Timelines

    KAUST Repository

    Manzoor, Emaad A.

    2015-05-12

    Broadcasts and timelines are the primary mechanism of information exchange in online social platforms today. Services like Facebook, Twitter and Instagram have enabled ordinary people to reach large audiences spanning cultures and countries, while their massive popularity has created increasingly competitive marketplaces of attention. Timing broadcasts to capture the attention of such geographically diverse audiences has sparked interest from many startups and social marketing gurus. However, formal study is lacking on both the timing and frequency problems. In this thesis, we introduce, motivate and solve the broadcast scheduling problem of specifying the timing and frequency of publishing content to maximise the attention received. We validate and quantify three interacting behavioural phenomena to parametrise social platform users: information overload, bursty circadian rhythms and monotony aversion, which is defined here for the first time. Our analysis of the influence of monotony refutes the common assumption that posts on social network timelines are consumed piecemeal independently. Instead, we reveal that posts are consumed in chunks, which has important consequences for any future work considering human behaviour over social network timelines. Our quantification of monotony aversion is also novel, and has applications to problems in various domains such as recommender list diversification, user satiation and variety-seeking consumer behaviour. Having studied the underlying behavioural phenomena, we link schedules, timelines, attention and behaviour by formalising a timeline information exchange process. Our formulation gives rise to a natural objective function that quantifies the expected collective attention an arrangement of posts on a timeline will receive. We apply this formulation as a case-study on real-data from Twitter, where we estimate behavioural parameters, calculate the attention potential for different scheduling strategies and, using the

  13. Biomonitoring of physiological status and cognitive performance of underway submariners undergoing a novel watch-standing schedule

    Science.gov (United States)

    Duplessis, C. A.; Cullum, M. E.; Crepeau, L. J.

    2005-05-01

    Submarine watch-standers adhere to a 6 hour-on, 12 hour-off (6/12) watch-standing schedule, yoking them to an 18-hr day, engendering circadian desynchronization and chronic sleep deprivation. Moreover, the chronic social crowding, shift work, and confinement of submarine life provide additional stressors known to correlate with elevated secretory immunoglobulin A (sIgA) and cortisol levels, reduced performance, immunologic dysfunction, malignancies, infections, gastrointestinal illness, coronary disease, anxiety, and depression. We evaluated an alternative, compressed, fixed work schedule designed to enhance circadian rhythm entrainment, sleep hygiene, performance, and health on 10 underway submariners, who followed the alternative and 6/12 schedules for approximately 2 weeks each. We measured subjects" sleep, cognitive performance, and salivary biomarker levels. Pilot analysis of the salivary data on one subject utilizing ELISA suggests elevated biomarker levels of stress. Average PM cortisol levels were 0.2 μg/L (normal range: nondetectable - 0.15 μg/L), and mean sIgA levels were 562 μg/ml (normal range: 100-500 μg/ml). Future research exploiting real-time salivary bioassays, via fluorescent polarimetry technology, identified by the Office of Naval Research (ONR) as a future Naval requirement, allows researchers to address correlations between stress-induced elaboration of salivary biomarkers with physiological and performance decrements, thereby fostering insight into the underway submariner"s psychoimmunological status. This may help identify strategies that enhance resilience to stressors. Specifically, empirically-based modeling can identify optimal watch-standing schedules and stress-mitigating procedures -- within the operational constraints of the submarine milieu and the mission --that foster improved circadian entrainment and reduced stress reactivity, enhancing physiological health, operational performance, safety, and job satisfaction.

  14. Probabilistic Anonymity and Admissible Schedulers

    CERN Document Server

    Garcia, Flavio D; Sokolova, Ana

    2007-01-01

    When studying safety properties of (formal) protocol models, it is customary to view the scheduler as an adversary: an entity trying to falsify the safety property. We show that in the context of security protocols, and in particular of anonymizing protocols, this gives the adversary too much power; for instance, the contents of encrypted messages and internal computations by the parties should be considered invisible to the adversary. We restrict the class of schedulers to a class of admissible schedulers which better model adversarial behaviour. These admissible schedulers base their decision solely on the past behaviour of the system that is visible to the adversary. Using this, we propose a definition of anonymity: for all admissible schedulers the identity of the users and the observations of the adversary are independent stochastic variables. We also develop a proof technique for typical cases that can be used to proof anonymity: a system is anonymous if it is possible to `exchange' the behaviour of two...

  15. Astronaut Office Scheduling System Software

    Science.gov (United States)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  16. Alternative Medicine and Your Child

    Science.gov (United States)

    ... 1- to 2-Year-Old Complementary and Alternative Medicine KidsHealth > For Parents > Complementary and Alternative Medicine A ... works. previous continue How CAM Differs From Traditional Medicine CAM is frequently distinguished by its holistic methods, ...

  17. Improved Quantum Genetic Algorithm in Application of Scheduling Engineering Personnel

    OpenAIRE

    Huaixiao Wang; Ling Li; Jianyong Liu; Yong Wang; Chengqun Fu

    2014-01-01

    To verify the availability of the improved quantum genetic algorithm in solving the scheduling engineering personnel problem, the following work has been carried out: the characteristics of the scheduling engineering personnel problem are analyzed, the quantum encoding method is proposed, and an improved quantum genetic algorithm is applied to address the issue. Taking the low efficiency and the bad performance of the conventional quantum genetic algorithm into account, a universal improved q...

  18. Balancing Life and the Mission: Compressed Scheduling in Law Enforcement

    Science.gov (United States)

    2010-03-01

    preventable disruption impacts the workforce, and creates unintended consequences for the agency and its managers. The phrase “ sausage making ” is often...compressed work schedule offers each agency and its employees many advantages. It makes the most efficient use of the available workforce to accomplish...schedule decreases attrition of a workforce. This makes the workforce much more stable while significantly reducing training costs caused by a high

  19. Work in the vicinity of the Ferney customs

    CERN Multimedia

    2005-01-01

    The Public Works and Housing Department of the Canton of Geneva and Geneva International Airport have scheduled large-scale work on the runway which passes over the Ferney tunnel. Although most of the work will be done at night, special traffic arrangements will be in force for the various phases of the work. The first phase of work will commence in mid-August and will last 14 weeks. The only change on the Route de Ferney will be that the lane reserved for taxis and buses will be closed. However, there will be single-lane alternating traffic on the Route Douanière, with traffic lights at the tunnel entrance. The second phase of work will start in November 2005. The traffic arrangements on the Route de Ferney will be the same, except that the lanes will be diverted laterally. There will continue to be single-lane alternating traffic on the Route Douanière. Three other phases of work are scheduled, lasting until June 2007.

  20. Ant Colony Optimisation for Backward Production Scheduling

    Directory of Open Access Journals (Sweden)

    Leandro Pereira dos Santos

    2012-01-01

    Full Text Available The main objective of a production scheduling system is to assign tasks (orders or jobs to resources and sequence them as efficiently and economically (optimised as possible. Achieving this goal is a difficult task in complex environment where capacity is usually limited. In these scenarios, finding an optimal solution—if possible—demands a large amount of computer time. For this reason, in many cases, a good solution that is quickly found is preferred. In such situations, the use of metaheuristics is an appropriate strategy. In these last two decades, some out-of-the-shelf systems have been developed using such techniques. This paper presents and analyses the development of a shop-floor scheduling system that uses ant colony optimisation (ACO in a backward scheduling problem in a manufacturing scenario with single-stage processing, parallel resources, and flexible routings. This scenario was found in a large food industry where the corresponding author worked as consultant for more than a year. This work demonstrates the applicability of this artificial intelligence technique. In fact, ACO proved to be as efficient as branch-and-bound, however, executing much faster.

  1. When greediness fails: examples from stochastic scheduling

    NARCIS (Netherlands)

    Uetz, Marc

    2003-01-01

    The purpose of this paper is to present examples for the sometimes surprisingly different behavior of deterministic and stochastic scheduling problems. In particular, it demonstrates some seemingly counterintuitive properties of optimal scheduling policies for stochastic machine scheduling problems.

  2. Bulletin publication schedule

    CERN Document Server

    Publications Section, DG-CO Group

    2011-01-01

    The final edition (Nos 51-52/2011 and 1-2-3/2012) of the Bulletin this year will be published on Friday 16 December and will cover events at CERN from 19 December 2011 to 19 January 2012. Announcements for publication in this issue should reach the Communication Group or the Staff Association, as appropriate, by noon on Tuesday 13 December. Bulletin publication schedule for 2012 The table below lists the 2012 publication dates for the paper version of the Bulletin and the corresponding deadlines for the submission of announcements. Please note that all announcements must be submitted by 12.00 noon on Tuesdays at the latest.   Bulletin No. Week number Submission of announcements (before 12.00 midday) Bulletin Web version Bulletin Printed version 4-5   Tuesday 17 January Fridays 20 and 27 January Wednesday25 January 6-7   Tuesday 31 January Fridays 3 and 10 February Wednesday 8 February 8-9 Tuesday 14 February Fridays 17 and 24 february Wednesday 22 Februa...

  3. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  4. Optimal Deadline Scheduling with Commitment

    CERN Document Server

    Chen, Shiyao; He, Ting

    2011-01-01

    We consider an online preemptive scheduling problem where jobs with deadlines arrive sporadically. A commitment requirement is imposed such that the scheduler has to either accept or decline a job immediately upon arrival. The scheduler's decision to accept an arriving job constitutes a contract with the customer; if the accepted job is not completed by its deadline as promised, the scheduler loses the value of the corresponding job and has to pay an additional penalty depending on the amount of unfinished workload. The objective of the online scheduler is to maximize the overall profit, i.e., the total value of the admitted jobs completed before their deadlines less the penalty paid for the admitted jobs that miss their deadlines. We show that the maximum competitive ratio is $3-2\\sqrt{2}$ and propose a simple online algorithm to achieve this competitive ratio. The optimal scheduling includes a threshold admission and a greedy scheduling policies. The proposed algorithm has direct applications to the chargin...

  5. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction and Schedule After nearly seven months of concentrated effort, the installation of services on YB0 moved off the CMS critical path in late November. In line with v36 planning provisions, the additional time needed to finish this challeng¬ing task was accommodated by reducing sequential dependencies between assembly tasks, putting more tasks (especially heavy logistic movements) in parallel with activities on, or within, the central wheel. Thus the lowering of wheels YB-1 and YB -2 and of disk YE-3 is already complete, the latter made possible, in the shadow of YB0 work, by inverting the order of the 3 endcap disks in the surface building. Weather conditions permitting, the Tracker will be transported to point 5 during CMS week for insertion in EB before CERN closes. The lowering of the last two disks will take place mid- and end-of January, respectively. Thus central beampipe installation can be confidently planned to start in February as foreseen, allowing closure of CMS in time for CRA...

  6. Space Surveillance Network Scheduling Under Uncertainty: Models and Benefits

    Science.gov (United States)

    Valicka, C.; Garcia, D.; Staid, A.; Watson, J.; Rintoul, M.; Hackebeil, G.; Ntaimo, L.

    2016-09-01

    Advances in space technologies continue to reduce the cost of placing satellites in orbit. With more entities operating space vehicles, the number of orbiting vehicles and debris has reached unprecedented levels and the number continues to grow. Sensor operators responsible for maintaining the space catalog and providing space situational awareness face an increasingly complex and demanding scheduling requirements. Despite these trends, a lack of advanced tools continues to prevent sensor planners and operators from fully utilizing space surveillance resources. One key challenge involves optimally selecting sensors from a network of varying capabilities for missions with differing requirements. Another open challenge, the primary focus of our work, is building robust schedules that effectively plan for uncertainties associated with weather, ad hoc collections, and other target uncertainties. Existing tools and techniques are not amenable to rigorous analysis of schedule optimality and do not adequately address the presented challenges. Building on prior research, we have developed stochastic mixed-integer linear optimization models to address uncertainty due to weather's effect on collection quality. By making use of the open source Pyomo optimization modeling software, we have posed and solved sensor network scheduling models addressing both forms of uncertainty. We present herein models that allow for concurrent scheduling of collections with the same sensor configuration and for proactively scheduling against uncertain ad hoc collections. The suitability of stochastic mixed-integer linear optimization for building sensor network schedules under different run-time constraints will be discussed.

  7. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  8. Sleep and alertness during alternating monophasic and polyphasic rest-activity cycles.

    Science.gov (United States)

    Porcú, S; Casagrande, M; Ferrara, M; Bellatreccia, A

    1998-07-01

    People involved in shift work often have to face altered patterns of sleep and wakefulness. This is particularly true for schedules involving night shifts and/or fragmentation of duty periods throughout the 24-hr day. In such conditions, it can be difficult to obtain satisfactory periods of sleep, and sleepiness on duty is a frequent and dangerous occurrence. The aim of this study was to evaluate sleep and wakefulness periods of subjects whose work schedule was characterized by an alternation of 2 hours of activity and 4 hours of rest (sleep allowed), repeated 4 times throughout the 24-hr day. This schedule was alternated with 24 hours off duty. Nine healthy male volunteers were monitored by means of ambulatory polysomnography while attending their 24-hr rest-activity schedule. Sleep periods were visually scored according to standard criteria. Wake periods were visually scored using both 30 s and 5 s epochs in order to reveal episodes of drowsiness and/or microsleep. Results showed that total sleep time was substantially reduced as compared to the usual 7-8 hour monophasic nocturnal sleep. Subjects did not sleep during the first rest period (11.00-15.00). Time in sleep linearly increased in the course of the 3 remaining rest periods. Normal sleep stage distribution was substantially spared only in the last rest period (3.00-7.00 a.m.). With regard to duty periods, only a few microsleeps were detected and their number did not significantly vary across the four 2-hr activity periods. In conclusion, this rest-activity schedule, despite the considerable sleep reduction, allowed maintaining good levels of vigilance as shown by the virtual absence of EEG microsleeps. Whether future research will prove that this regimen does not cause an impairment of performance, it should be a suitable strategy for the management of continuous operations.

  9. The linear system theory's account of behavior maintained by variable-ratio schedules.

    Science.gov (United States)

    McDowell, J J; Wixted, J T

    1988-01-01

    The mathematical theory of linear systems, which has been used successfully to describe behavior maintained by variable-interval schedules, is extended to describe behavior maintained by variable-ratio schedules. The result of the analysis is a pair of equations, one of which expresses response rate on a variable-ratio schedule as a function of the mean ratio requirement (n) that the schedule arranges. The other equation expresses response rate on a variable-ratio schedule as a function of reinforcement rate. Both equations accurately describe existing data from variable-ratio schedules. The theory accounts for two additional characteristics of behavior maintained by variable-ratio schedules; namely, the appearance of strained, two-valued (i.e., zero or very rapid) responding at large ns, and the abrupt cessation of responding at a boundary n. The theory also accounts for differences between behavior on variable-interval and variable-ratio schedules, including (a) the occurrence of strained responding on variable-ratio but not on variable-interval schedules, (b) the abrupt cessation of responding on occurrence of higher response rates on variable-ratio than on variable-interval schedules. Furthermore, given data from a series of variable-interval schedules and from a series of concurrent variable-ratio variable-interval schedules, the theory permits quantitative prediction of many properties of behavior on single-alternative variable-ratio schedules. The linear system theory's combined account of behavior on variable-interval and variable-ratio schedules is superior to existing versions of six other mathematical theories of variable-interval and variable-ratio responding. PMID:3279150

  10. Scheduling the Belgian soccer league.

    OpenAIRE

    Goossens, Dries; Spieksma, Frederik

    2009-01-01

    Any sports league needs a schedule of play, and such a schedule can be important, as it may influence the outcome of the sports competition itself and since it may have an impact on the interests of all parties involved. As in many other sports leagues and countries, the interest for Belgian soccer has increased over the last years. This paper describes our experiences in scheduling the highest Belgian soccer league. We describe how we automated and improved the way in which the calendar is ...

  11. A visual representation system for the scheduling and management of projects

    NARCIS (Netherlands)

    Pollalis, S.N.

    1992-01-01

    A VISUAL SCHEDULING AND MANAGEMENT SYSTEM (VSMS) This work proposes a new system for the visual representation of projects that displays the quantities of work, resources and cost. This new system, called Visual Scheduling and Management System, has a built-in hierarchical system to provide differen

  12. Dynamic Scheduling for Cloud Reliability using Transportation Problem

    Directory of Open Access Journals (Sweden)

    P. Balasubramanie

    2012-01-01

    Full Text Available Problem statement: Cloud is purely a dynamic environment and the existing task scheduling algorithms are mostly static and considered various parameters like time, cost, make span, speed, scalability, throughput, resource utilization, scheduling success rate and so on. Available scheduling algorithms are mostly heuristic in nature and more complex, time consuming and does not consider reliability and availability of the cloud computing environment. Therefore there is a need to implement a scheduling algorithm that can improve the availability and reliability in cloud environment. Approach: We propose a new algorithm using modified linear programming problem transportation based task scheduling and resource allocation for decentralized dynamic cloud computing. The Main objective is to improve the reliability of cloud computing environment by considering the resources available and it’s working status of each Cluster periodically and maximizes the profit for the cloud providers by minimizing the total cost for scheduling, allocation and execution cost and minimizing total turn-around, total waiting time and total execution time. Our proposed algorithm also utilizes task historical values such as past success rate, failure rate of task in each Cluster and previous execution time and total cost for various Clusters for each task from Task Info Container (TFC for tasks scheduling resource allocation for near future. Results: Our approach TP Scheduling (Transpotation Problem based responded for various tasks assigned by clients in poisson arrival pattern and achieved the improved reliability in dynamic decentralized cloud environment. Conclusion: With our proposed TP Scheduling algorithn we improve the Reliability of the decentralized dynamic cloud computing.

  13. Aplastic Anemia: Alternative Immunosuppressive Treatments and Eltrombopag. A report from the 2014 EBMT Educational Meeting from the Severe Aplastic Anaemia and Infectious Diseases Working Parties.

    Science.gov (United States)

    Risitano, Antonio M

    2015-01-25

    Acquired idiopathic AA is the most typical form of immune-mediated bone marrow failure; the standard treatment of AA for patients who lack a transplant option is immunosuppressive treatment (IST). The standard IST regimen is horse anti-thymocyte globuline (h-ATG) combined with cyclosporine A (CsA), which results in a long term survival around 65-70%. In the past two decades several efforts have been made to improve these results, however results were quite disappointing. Indeed, the addition of a third immunosuppressive agent (micophenolate and sirolimus) on the h-ATG/CsA platform has not resulted in any benefit. Furthermore, the use of anti-lymphocyte agents other than h-ATG (rabbit-ATG, cyclophosphamide, alemtuzumab) has not reproduced the positive outcome seen with standard h-ATG + CsA, irrespective of a more pronounced lymphocyte depletion observed with these alternative compounds. Thus, at least with the strategies tested so far, the strengthening of IST has not led to improved results. More recently, the use of the thrombopoietin mimetic agent eltrombopag has emerged as a possible option to rescue patients failing IST. Nowadays the protection and/or stimulation of residual hematopoietic stem cells by eltrombopag seem an interesting strategy which, once combined with IST, may improve its clinical efficacy. Prospective studies which combine h-ATG and CsA with eltrombopag are currently ongoing in the United States and in Europe, eventually aiming to establish the best non-transplant treatment of AA in the new millennium.

  14. Workload-aware VM Scheduling on Multicore Systems

    Directory of Open Access Journals (Sweden)

    Insoon Jo

    2011-11-01

    Full Text Available In virtualized environments, performance interference between virtual machines (VMs is a key challenge. In order to mitigate resource contention, an efficient VM scheduling is positively necessary.In this paper, we propose a workload-aware VM scheduler on multi-core systems, which finds a systemwide mapping of VMs to physical cores. Our work aims not only at minimizing the number of used hosts,but at maximizing the system throughput. To achieve the first goal, our scheduler dynamically adjusts a set of used hosts. To achieve the second goal, it maps each VM on a physical core where the physical core and its host most sufficiently meet the resource requirements of the VM. Evaluation demonstrates that our scheduling ensures efficient use of data center resources.

  15. Aircraft nonlinear optimal control using fuzzy gain scheduling

    Science.gov (United States)

    Nusyirwan, I. F.; Kung, Z. Y.

    2016-10-01

    Fuzzy gain scheduling is a common solution for nonlinear flight control. The highly nonlinear region of flight dynamics is determined throughout the examination of eigenvalues and the irregular pattern of root locus plots that show the nonlinear characteristic. By using the optimal control for command tracking, the pitch rate stability augmented system is constructed and the longitudinal flight control system is established. The outputs of optimal control for 21 linear systems are fed into the fuzzy gain scheduler. This research explores the capability in using both optimal control and fuzzy gain scheduling to improve the efficiency in finding the optimal control gains and to achieve Level 1 flying qualities. The numerical simulation work is carried out to determine the effectiveness and performance of the entire flight control system. The simulation results show that the fuzzy gain scheduling technique is able to perform in real time to find near optimal control law in various flying conditions.

  16. Ergonomic workforce scheduling under complex worker limitation and task requirements:

    Directory of Open Access Journals (Sweden)

    Tanuchporn Wongwien

    2012-11-01

    Full Text Available The ergonomic workforce scheduling problem (WPS is addressed in this paper. Unlike its previous related works, theproblem considers realistic worker limitation and task requirements that include heterogeneous workforce with limited taskflexibility, varying worker team sizes, and pre-defined task operation schedules. Its main objective is to find a daily rotatingwork schedule solution using a minimum number of workers such that all workers’ ergonomics hazard exposures do notexceed a permissible limit. Initially, the ergonomic WPS is explained. Its mathematical model and approximation procedure toobtain the workforce schedule solution are described. From the results of the computation experiment, it can be concludedthat the approximation procedure is both efficient and effective in solving large-sized ergonomic workforce schedulingproblems.

  17. The Single And Multi Project Approach To Planning And Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2008-01-01

    The fragmentation of the construction industry in Denmark is reflected in the organisation of construction projects, which typically involves a large number of subcontractors. The main contractor, being responsible for the planning and scheduling of construction work, is thus faced......, reallocations of subcontracting resources lead to project interruptions which counteract on the overall productivity of the single construction project. Thus, there is a planning and scheduling conflict between the operational multi project management of the subcontracting firm and the management of single...... projects carried out by the management on site. This paper explains the single and multi project perspective on construction planning and scheduling represented by the main and the subcontractors and further, it describes how the prevailing scheduling method of today, i.e. the critical path method, conduce...

  18. Mixed Criticality Scheduling for Industrial Wireless Sensor Networks

    Science.gov (United States)

    Jin, Xi; Xia, Changqing; Xu, Huiting; Wang, Jintao; Zeng, Peng

    2016-01-01

    Wireless sensor networks (WSNs) have been widely used in industrial systems. Their real-time performance and reliability are fundamental to industrial production. Many works have studied the two aspects, but only focus on single criticality WSNs. Mixed criticality requirements exist in many advanced applications in which different data flows have different levels of importance (or criticality). In this paper, first, we propose a scheduling algorithm, which guarantees the real-time performance and reliability requirements of data flows with different levels of criticality. The algorithm supports centralized optimization and adaptive adjustment. It is able to improve both the scheduling performance and flexibility. Then, we provide the schedulability test through rigorous theoretical analysis. We conduct extensive simulations, and the results demonstrate that the proposed scheduling algorithm and analysis significantly outperform existing ones. PMID:27589741

  19. A greedy double swap heuristic for nurse scheduling

    Directory of Open Access Journals (Sweden)

    Murphy Choy

    2012-10-01

    Full Text Available One of the key challenges of nurse scheduling problem (NSP is the number of constraints placed on preparing the timetable, both from the regulatory requirements as well as the patients’ demand for the appropriate nursing care specialists. In addition, the preferences of the nursing staffs related to their work schedules add another dimension of complexity. Most solutions proposed for solving nurse scheduling involve the use of mathematical programming and generally considers only the hard constraints. However, the psychological needs of the nurses are ignored and this resulted in subsequent interventions by the nursing staffs to remedy any deficiency and often results in last minute changes to the schedule. In this paper, we present a staff preference optimization framework solved with a greedy double swap heuristic. The heuristic yields good performance in speed at solving the problem. The heuristic is simple and we will demonstrate its performance by implementing it on open source spreadsheet software.

  20. Energy Constrained Hierarchical Task Scheduling Algorithm for Mobile Grids

    Directory of Open Access Journals (Sweden)

    Arjun Singh

    2014-05-01

    Full Text Available In mobile grids, scheduling the computation tasks and the communication transactions onto the target architecture is the important problem when a mobile grid environment and a pre-selected architecture are given. Even though the scheduling problem is a traditional topic, almost all previous work focuses on maximizing the performance through the scheduling process. The algorithms developed this way are not suitable for real-time embedded applications, in which the main objective is to minimize the energy consumption of the system under tight performance constraints. This paper entails an energy constrained hierarchical task scheduling algorithm for Mobile Grids to minimize the power consumption of the mobile nodes. The task is rescheduled when the mobile node moves beyond the transmission range. The performance is estimated based on the average delay and packet delivery ratio based on nodes and flows. The performance metrics are analysed using NS-2 simulator.

  1. A Greedy Double Swap Heuristic for Nurse Scheduling

    CERN Document Server

    Choy, Murphy

    2012-01-01

    One of the key challenges of nurse scheduling problem (NSP) is the number of constraints placed on preparing the timetable, both from the regulatory requirements as well as the patients' demand for the appropriate nursing care specialists. In addition, the preferences of the nursing staffs related to their work schedules add another dimension of complexity. Most solutions proposed for solving nurse scheduling involve the use of mathematical programming and generally considers only the hard constraints. However, the psychological needs of the nurses are ignored and this resulted in subsequent interventions by the nursing staffs to remedy any deficiency and often results in last minute changes to the schedule. In this paper, we present a staff preference optimization framework which is solved with a greedy double swap heuristic. The heuristic yields good performance in speed at solving the problem. The heuristic is simple and we will demonstrate its performance by implementing it on open source spreadsheet soft...

  2. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  3. The GBT Dynamic Scheduling System

    Science.gov (United States)

    McCarty, M. T.; Balser, D. S.; Braatz, J.; Clark, M. H.; Condon, J.; Creager, R. E.; Maddalena, R. J.; Marganian, P.; O'Neil, K.; Sessoms, E.; Shelton, A. L.

    2012-09-01

    The Robert C. Byrd Green Bank Telescope (GBT) Dynamic Scheduling System (DSS), in use since September, 2009, was designed to maximize observing efficiency while preserving telescope flexibility and data quality without creating undue adversity for the observers. Using observing criteria; observer availability and qualifications for remote observing; three-dimensional weather forecasts; and telescope state, the DSS software optimally schedules observers 24 to 48 hours in advance for a telescope that has a wide-range of capabilities and a geographical location with variable weather patterns. The DSS project was closed October 28, 2011 and will now enter a continuing maintenance and enhancement phase. Recent improvements include a new resource calendar for incorporating telescope maintenance activities, a sensitivity calculator that leverages the scheduling algorithms to facilitate consistent tools for proposal preparation, improved support for monitoring observations, scheduling of high frequency continuum and spectral line observations for both sparse and fully sampled array receivers, and additional session parameters for observations having special requirements.

  4. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  5. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  6. Batch Delivery Scheduling with Multiple Decentralized Manufacturers

    Directory of Open Access Journals (Sweden)

    Shi Li

    2014-01-01

    Full Text Available This paper addresses an integrated decision on production scheduling and delivery operations, which is one of the most important issues in supply chain scheduling. We study a model in which a set of jobs ordered by only one customer and a set of decentralized manufacturers located at different locations are considered. Specifically, each job must be assigned to one of the decentralized manufacturers to process on its single machine facility. Then, the job is delivered to the customer directly in batch without intermediate inventory. The objective is to find a joint schedule of production and distribution to optimize the customer service level and delivery cost. In our work, we discuss this problem considering two different situations in terms of the customer service level. In the first one, the customer service is measured by the maximum arrival time, while the customer service is measured by the total arrival time in the second one. For each situation, we develop a dynamic programming algorithm to solve, respectively. Moreover, we identify a special case for the latter situation by introducing its corresponding solutions.

  7. Schedule of conditions for the personnel formation of category A or B working in nuclear facilities; Cahier des charges pour la formation du personnel de categorie A ou B travaillant dans les installations nucleaires

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This document describes the main provisions concerning the formation and the radiation and conventional risks protection of A or B category personnel, working in nuclear facilities. It contents the application domain, the applicable documents, the liability, the formation organizations, the formation to the risk prevention, the retraining and the Passerelles formations. (A.L.B.)

  8. Comparison of alternative versions of the job demand-control scales in 17 European cohort studies: the IPD-Work consortium

    Directory of Open Access Journals (Sweden)

    Fransson Eleonor I

    2012-01-01

    Full Text Available Abstract Background Job strain (i.e., high job demands combined with low job control is a frequently used indicator of harmful work stress, but studies have often used partial versions of the complete multi-item job demands and control scales. Understanding whether the different instruments assess the same underlying concepts has crucial implications for the interpretation of findings across studies, harmonisation of multi-cohort data for pooled analyses, and design of future studies. As part of the 'IPD-Work' (Individual-participant-data meta-analysis in working populations consortium, we compared different versions of the demands and control scales available in 17 European cohort studies. Methods Six of the 17 studies had information on the complete scales and 11 on partial scales. Here, we analyse individual level data from 70 751 participants of the studies which had complete scales (5 demand items, 6 job control items. Results We found high Pearson correlation coefficients between complete scales of job demands and control relative to scales with at least three items (r > 0.90 and for partial scales with two items only (r = 0.76-0.88. In comparison with scores from the complete scales, the agreement between job strain definitions was very good when only one item was missing in either the demands or the control scale (kappa > 0.80; good for job strain assessed with three demand items and all six control items (kappa > 0.68 and moderate to good when items were missing from both scales (kappa = 0.54-0.76. The sensitivity was > 0.80 when only one item was missing from either scale, decreasing when several items were missing in one or both job strain subscales. Conclusions Partial job demand and job control scales with at least half of the items of the complete scales, and job strain indices based on one complete and one partial scale, seemed to assess the same underlying concepts as the complete survey instruments.

  9. A system simulation model applied to the production schedule of a fish processing facility

    Directory of Open Access Journals (Sweden)

    Carla Roberta Pereira

    2012-11-01

    Full Text Available The simulation seeks to import the reality to a controlled environment, where it is possible to study it behavior, under several conditions, without involving physical risks and/or high costs. Thus, the system simulation becomes a useful and powerful technique in emergence markets, as the tilapiculture sector that needs to expand its business. The main purpose of this study was the development of a simulation model to assist the decisions making of the production scheduling of a fish processing facility. It was applied, as research method, the case study and the modeling/simulation, including in this set the SimuCAD methodology and the development phases of a simulation model. The model works with several alternative scenarios, testing different working shifts, types of flows and production capacity, besides variations of the ending inventory and sales. The result of this research was a useful and differentiated model simulation to assist the decision making of the production scheduling of fish processing facility studied.

  10. 75 FR 39629 - FOIA Fee Schedule Update

    Science.gov (United States)

    2010-07-12

    ... 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of... Information Act (FOIA) Fee Schedule Update pursuant to 10 CFR 1703.107(b)(6) of the Board's regulations. DATES... update the FOIA Fee Schedule once every 12 months. The previous Fee Schedule Update was published in...

  11. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board... publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to the Board's regulations... General Manager will update the FOIA Fee Schedule once every 12 months. The previous Fee Schedule...

  12. Gain scheduling using the youla parameterization

    DEFF Research Database (Denmark)

    Niemann, H.H.; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector theta cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector theta has been derived by using the Youla parameterization...

  13. FMDP reactor alternative summary report: Volume 4, Evolutionary LWR alternative

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    Significant quantities of weapons-usable fissile materials [primarily plutonium and highly enriched uranium (HEU)] have become surplus to national defense needs both in the United States and Russia. These stocks of fissile materials pose significant dangers to national and international security. The dangers exist not only in the potential proliferation of nuclear weapons but also in the potential for environmental, safety, and health (ES&H) consequences if surplus fissile materials are not properly managed. The purpose of this report is to provide schedule, cost, and technical information that will be used to support the Record of Process (ROD). Following the screening process, DOE/MD via its national laboratories initiated a more detailed analysis activity to further evaluate each of the ten plutonium disposition alternatives that survived the screening process. Three ``Alternative Teams,`` chartered by DOE and comprised of technical experts from across the DOE national laboratory complex, conducted these analyses. One team was chartered for each of the major disposition classes (borehole, immobilization, and reactors). During the last year and a half, the Fissile Materials Disposition Program (FMDP) Reactor Alternative Team (RxAT) has conducted extensive analyses of the cost, schedule, technical maturity, S&S, and other characteristics of reactor-based plutonium disposition. The results of the RxAT`s analyses of the existing LWR, CANDU, and partially complete LWR alternatives are documented in Volumes 1-3 of this report. This document (Volume 4) summarizes the results of these analyses for the ELWR-based plutonium disposition option.

  14. Modelling a Nurse Shift Schedule with Multiple Preference Ranks for Shifts and Days-Off

    Directory of Open Access Journals (Sweden)

    Chun-Cheng Lin

    2014-01-01

    Full Text Available When it comes to nurse shift schedules, it is found that the nursing staff have diverse preferences about shift rotations and days-off. The previous studies only focused on the most preferred work shift and the number of satisfactory days-off of the schedule at the current schedule period but had few discussions on the previous schedule periods and other preference levels for shifts and days-off, which may affect fairness of shift schedules. As a result, this paper proposes a nurse scheduling model based upon integer programming that takes into account constraints of the schedule, different preference ranks towards each shift, and the historical data of previous schedule periods to maximize the satisfaction of all the nursing staff's preferences about the shift schedule. The main contribution of the proposed model is that we consider that the nursing staff’s satisfaction level is affected by multiple preference ranks and their priority ordering to be scheduled, so that the quality of the generated shift schedule is more reasonable. Numerical results show that the planned shifts and days-off are fair and successfully meet the preferences of all the nursing staff.

  15. Integrating job scheduling and constrained network routing

    DEFF Research Database (Denmark)

    Gamst, Mette

    2010-01-01

    This paper examines the NP-hard problem of scheduling jobs on resources such that the overall profit of executed jobs is maximized. Job demand must be sent through a constrained network to the resource before execution can begin. The problem has application in grid computing, where a number...... of geographically distributed resources connected through an optical network work together for solving large problems. A number of heuristics are proposed along with an exact solution approach based on Dantzig-Wolfe decomposition. The latter has some performance difficulties while the heuristics solve all instances...

  16. Capability of the Maximax&Maximin selection operator in the evolutionary algorithm for a nurse scheduling problem

    Science.gov (United States)

    Ramli, Razamin; Tein, Lim Huai

    2016-08-01

    A good work schedule can improve hospital operations by providing better coverage with appropriate staffing levels in managing nurse personnel. Hence, constructing the best nurse work schedule is the appropriate effort. In doing so, an improved selection operator in the Evolutionary Algorithm (EA) strategy for a nurse scheduling problem (NSP) is proposed. The smart and efficient scheduling procedures were considered. Computation of the performance of each potential solution or schedule was done through fitness evaluation. The best so far solution was obtained via special Maximax&Maximin (MM) parent selection operator embedded in the EA, which fulfilled all constraints considered in the NSP.

  17. Alternative metrics

    Science.gov (United States)

    2012-11-01

    As the old 'publish or perish' adage is brought into question, additional research-impact indices, known as altmetrics, are offering new evaluation alternatives. But such metrics may need to adjust to the evolution of science publishing.

  18. An Improved Round Robin Scheduling Algorithm for CPU scheduling

    Directory of Open Access Journals (Sweden)

    Rakesh Kumar yadav

    2010-07-01

    Full Text Available There are many functions which are provided by operating system like process management, memory management, file management, input/outputmanagement, networking, protection system and command interpreter system. In these functions, the process management is most important function because operating system is a system program that means at the runtime process interact with hardware. Therefore, we can say that for improving the efficiency of a CPU we need to manage all process. For managing the process we use various types scheduling algorithm. There are many algorithm are available for CPU scheduling. But all algorithms have its own deficiency and limitations. In this paper, I proposed a new approach for round robin scheduling algorithm which helps to improve the efficiency of CPU.

  19. An Optimized Round Robin Scheduling Algorithm for CPU Scheduling

    Directory of Open Access Journals (Sweden)

    Ajit Singh

    2010-10-01

    Full Text Available The main objective of this paper is to develop a new approach for round robin scheduling which help to improve the CPU efficiency in real time and time sharing operating system. There are many algorithms available for CPU scheduling. But we cannot implemented in real time operating system because of high context switch rates, large waiting time, large response time, large trn around time and less throughput. The proposed algorithm improves all the drawback of simple round robin architecture. The author have also given comparative analysis of proposed with simple round robin scheduling algorithm. Therefore, the author strongly feel that the proposed architecture solves all the problem encountered in simple round robin architecture by decreasing the performance parameters to desirable extent and thereby increasing the system throughput.

  20. Design Principles and Algorithms for Air Traffic Arrival Scheduling

    Science.gov (United States)

    Erzberger, Heinz; Itoh, Eri

    2014-01-01

    This report presents design principles and algorithms for building a real-time scheduler of arrival aircraft based on a first-come-first-served (FCFS) scheduling protocol. The algorithms provide the conceptual and computational foundation for the Traffic Management Advisor (TMA) of the Center/terminal radar approach control facilities (TRACON) automation system, which comprises a set of decision support tools for managing arrival traffic at major airports in the United States. The primary objective of the scheduler is to assign arrival aircraft to a favorable landing runway and schedule them to land at times that minimize delays. A further objective of the scheduler is to allocate delays between high-altitude airspace far away from the airport and low-altitude airspace near the airport. A method of delay allocation is described that minimizes the average operating cost in the presence of errors in controlling aircraft to a specified landing time. This report is a revision of an earlier paper first presented as part of an Advisory Group for Aerospace Research and Development (AGARD) lecture series in September 1995. The authors, during vigorous discussions over the details of this paper, felt it was important to the air-trafficmanagement (ATM) community to revise and extend the original 1995 paper, providing more detail and clarity and thereby allowing future researchers to understand this foundational work as the basis for the TMA's scheduling algorithms.

  1. A Hybrid Bacterial Foraging Algorithm For Solving Job Shop Scheduling Problems

    OpenAIRE

    Narendhar, S.; T Amudha

    2012-01-01

    Bio-Inspired computing is the subset of Nature-Inspired computing. Job Shop Scheduling Problem is categorized under popular scheduling problems. In this research work, Bacterial Foraging Optimization was hybridized with Ant Colony Optimization and a new technique Hybrid Bacterial Foraging Optimization for solving Job Shop Scheduling Problem was proposed. The optimal solutions obtained by proposed Hybrid Bacterial Foraging Optimization algorithms are much better when compared with the solution...

  2. A FAST AND ELITIST BI-OBJECTIVE EVOLUTIONARY ALGORITHM FOR SCHEDULING INDEPENDENT TASKS ON HETEROGENEOUS SYSTEMS

    OpenAIRE

    2010-01-01

    To meet the increasing computational demands, geographically distributed resources need to be logically coupled to make them work as a unified resource. In analyzing the performance of such distributed heterogeneous computing systems scheduling a set of tasks to the available set of resources for execution is highly important. Task scheduling being an NP-complete problem, use of metaheuristics is more appropriate in obtaining optimal solutions. Schedules thus obtained can be evaluated using s...

  3. SOFIA's Choice: Automating the Scheduling of Airborne Observations

    Science.gov (United States)

    Frank, Jeremy; Norvig, Peter (Technical Monitor)

    1999-01-01

    This paper describes the problem of scheduling observations for an airborne telescope. Given a set of prioritized observations to choose from, and a wide range of complex constraints governing legitimate choices and orderings, how can we efficiently and effectively create a valid flight plan which supports high priority observations? This problem is quite different from scheduling problems which are routinely solved automatically in industry. For instance, the problem requires making choices which lead to other choices later, and contains many interacting complex constraints over both discrete and continuous variables. Furthermore, new types of constraints may be added as the fundamental problem changes. As a result of these features, this problem cannot be solved by traditional scheduling techniques. The problem resembles other problems in NASA and industry, from observation scheduling for rovers and other science instruments to vehicle routing. The remainder of the paper is organized as follows. In 2 we describe the observatory in order to provide some background. In 3 we describe the problem of scheduling a single flight. In 4 we compare flight planning and other scheduling problems and argue that traditional techniques are not sufficient to solve this problem. We also mention similar complex scheduling problems which may benefit from efforts to solve this problem. In 5 we describe an approach for solving this problem based on research into a similar problem, that of scheduling observations for a space-borne probe. In 6 we discuss extensions of the flight planning problem as well as other problems which are similar to flight planning. In 7 we conclude and discuss future work.

  4. Scheduling of semiconductor product line based on constant work in process release system%基于固定在制品数投料系统的半导体生产线调度

    Institute of Scientific and Technical Information of China (English)

    赵奇; 吴智铭

    2007-01-01

    为优化半导体生产系统,针对半导体生产线的特点,建立基于在制品数(Work in Process,WIP)水平控制投料的数学模型.通过仿真试验,得出不同WIP水平对生产线性能的影响;比较固定在制品数(CONstant WIP,CONWIP)投料系统与固定时间间隔投料(CONstant Release Interval,CONRIN)系统之间的性能差异.在不停线的情况下,对增加生产品种的生产线进行分析,得出一些关于影响WIP水平因素的定性规律.

  5. Maternal Nutrition and Four-Alternative Choice

    Science.gov (United States)

    Davison, Michael; Krageloh, Christian U.; Fraser, Mhoyra; Breier, Bernhard H.

    2007-01-01

    Two groups of 10 male rats were trained to nose poke for food pellets at four alternatives that provided differing rates of pellet delivery on aperiodic schedules. After a fixed number of pellets had been delivered, 5, 10 or 20 in different conditions of the experiment, a 10-s blackout occurred, and the locations of the differing rates of pellet…

  6. Dynamic scheduling and analysis of real time systems with multiprocessors

    Directory of Open Access Journals (Sweden)

    M.D. Nashid Anjum

    2016-08-01

    Full Text Available This research work considers a scenario of cloud computing job-shop scheduling problems. We consider m realtime jobs with various lengths and n machines with different computational speeds and costs. Each job has a deadline to be met, and the profit of processing a packet of a job differs from other jobs. Moreover, considered deadlines are either hard or soft and a penalty is applied if a deadline is missed where the penalty is considered as an exponential function of time. The scheduling problem has been formulated as a mixed integer non-linear programming problem whose objective is to maximize net-profit. The formulated problem is computationally hard and not solvable in deterministic polynomial time. This research work proposes an algorithm named the Tube-tap algorithm as a solution to this scheduling optimization problem. Extensive simulation shows that the proposed algorithm outperforms existing solutions in terms of maximizing net-profit and preserving deadlines.

  7. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Ravn, Anders P.;

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact ...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way.......Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...

  8. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  9. A Disk Scheduling Algorithm: SPFF

    Institute of Scientific and Technical Information of China (English)

    HU Ming

    2005-01-01

    We put forward an optimal disk schedule with n disk requests and prove its optimality mathematically. Generalizing the idea of an optimal disk schedule, we remove the limit of n requests and, at the same time, consider the dynamically arrival model of disk requests to obtain an algorithm, shortest path first-fit first (SPFF). This algorithm is based on the shortest path of disk head motion constructed by all the pendent requests. From view of the head-moving distance, it has the stronger globality than SSTF. From view of the head-moving direction, it has the better flexibility than SCAN. Therefore, SPFF keeps the advantage of SCAN and, at the same time, absorbs the strength of SSTF. The algorithm SPFF not only shows the more superiority than other scheduling polices, but also have higher adjustability to meet the computer system's different demands.

  10. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington.

  11. Feature-based telescope scheduler

    Science.gov (United States)

    Naghib, Elahesadat; Vanderbei, Robert J.; Stubbs, Christopher

    2016-07-01

    Feature-based Scheduler offers a sequencing strategy for ground-based telescopes. This scheduler is designed in the framework of Markovian Decision Process (MDP), and consists of a sub-linear online controller, and an offline supervisory control-optimizer. Online control law is computed at the moment of decision for the next visit, and the supervisory optimizer trains the controller by simulation data. Choice of the Differential Evolution (DE) optimizer, and introducing a reduced state space of the telescope system, offer an efficient and parallelizable optimization algorithm. In this study, we applied the proposed scheduler to the problem of Large Synoptic Survey Telescope (LSST). Preliminary results for a simplified model of LSST is promising in terms of both optimality, and computational cost.

  12. Practice expenses in the MFS (Medicare fee schedule): the service-class approach.

    Science.gov (United States)

    Latimer, E A; Kane, N M

    1995-01-01

    The practice expense component of the Medicare fee schedule (MFS), which is currently based on historical charges and rewards physician procedures at the expense of cognitive services, is due to be changed by January 1, 1998. The Physician Payment Review Commission (PPRC) and others have proposed microcosting direct costs and allocating all indirect costs on a common basis, such as physician time or work plus direct costs. Without altering the treatment of direct costs, the service-class approach disaggregates indirect costs into six practice function costs. The practice function costs are then allocated to classes of services using cost-accounting and statistical methods. This approach would make the practice expense component more resource-based than other proposed alternatives.

  13. Scheduling to Minimize Energy and Flow Time in Broadcast Scheduling

    CERN Document Server

    Moseley, Benjamin

    2010-01-01

    In this paper we initiate the study of minimizing power consumption in the broadcast scheduling model. In this setting there is a wireless transmitter. Over time requests arrive at the transmitter for pages of information. Multiple requests may be for the same page. When a page is transmitted, all requests for that page receive the transmission simulteneously. The speed the transmitter sends data at can be dynamically scaled to conserve energy. We consider the problem of minimizing flow time plus energy, the most popular scheduling metric considered in the standard scheduling model when the scheduler is energy aware. We will assume that the power consumed is modeled by an arbitrary convex function. For this problem there is a $\\Omega(n)$ lower bound. Due to the lower bound, we consider the resource augmentation model of Gupta \\etal \\cite{GuptaKP10}. Using resource augmentation, we give a scalable algorithm. Our result also gives a scalable non-clairvoyant algorithm for minimizing weighted flow time plus energ...

  14. Maintenance of residual renal function 10 years after the start of hemodialysis: the advantage of tailored schedules?

    Science.gov (United States)

    Piccoli, G B; Burdese, M; Mezza, E; Consiglio, V; Mangiarotti, G; Thea, A; Bermond, F; Gai, M; Lanfranco, G; Jeantet, A; Segoloni, G P

    2004-03-01

    Maintenance of residual renal clearance is a clinical advantage, protecting against the long-term effects of uremia: although demonstrated in peritoneal dialysis, the strategies in hemodialysis are less clear. This case suggests that dialysis schedules individualized on the basis of renal clearances may help preserve residual function. SB is a 58 year-old male who started dialysis in emergency (creatinine 30.7 mg/dL) in 1993. He had a history of gout, small shrunken kidneys and moderate hypertension. The clinical diagnosis was vasculointerstitial nephropathy. Eighteen months after starting hemodialysis on a conventional thrice weekly schedule, the patient was switched to 2 sessions/week (creatinine clearance increased to 6 ml/min). Thereafter, clearances were checked in alternate months and treatment was tailored to an equivalent renal clearance > or =12 ml/min (1-2 sessions, 2-3.30 hours/week). Ten years after beginning dialysis, he is on a twice weekly schedule (3.30 hours), is normotensive, works full-time and does not want to go on a transplant waiting list.

  15. Intelligent Scheduling for Underground Mobile Mining Equipment.

    Directory of Open Access Journals (Sweden)

    Zhen Song

    Full Text Available Many studies have been carried out and many commercial software applications have been developed to improve the performances of surface mining operations, especially for the loader-trucks cycle of surface mining. However, there have been quite few studies aiming to improve the mining process of underground mines. In underground mines, mobile mining equipment is mostly scheduled instinctively, without theoretical support for these decisions. Furthermore, in case of unexpected events, it is hard for miners to rapidly find solutions to reschedule and to adapt the changes. This investigation first introduces the motivation, the technical background, and then the objective of the study. A decision support instrument (i.e. schedule optimizer for mobile mining equipment is proposed and described to address this issue. The method and related algorithms which are used in this instrument are presented and discussed. The proposed method was tested by using a real case of Kittilä mine located in Finland. The result suggests that the proposed method can considerably improve the working efficiency and reduce the working time of the underground mine.

  16. 护士分层管理及弹性排班在心外科护理工作中的应用与探索%Exploration and Application of Nurse Hierarchical Management and Flexible Scheduling in Cardiac Surgery in Nursing Work

    Institute of Scientific and Technical Information of China (English)

    袁利琴; 李丹; 李玲

    2016-01-01

    Objective To investigate the application of lfexible scheduling mode based on the hierarchical management of nurses in nursing work in cardiac surgery.Methods To implement APN scheduling, to equip with different levels of nurses in each period, both to avoid single class, and ensure the levels of nurses high-low match.Results The complaint of nursing from patients and doctors was reduced, the degree of satisfaction about patient was increased, thelevel of tension and fear about low seniority nurses were reduced. ConclusionThe use of the nurse hierarchical and lfexible schedulingmaximized the efifciency and effectiveness of nursing work.It has played a positive role in meeting the needs of patients, ensuring the safety of patients and improving the quality of nursing.At the same time,the reduction of the work pressure of low seniority nurses achieved remarkable results.%目的:探讨护士分层管理基础上的弹性排班模式在心外科护理工作中的应用效果。方法实施APN排班,在每个上班时段配备不同层级的护士,既避免单人单班,又保证护士层级上的高-低搭配。结果来自患者及医生方面的护理投诉减少;患者满意度提高;低年资护士工作紧张恐惧感降低。结论通过护士分层使用及弹性排班,实现了护理工作效率和效果最大化,对满足患者需求,保障患者安全及提高护理质量起到了积极的作用;同时对降低低年资护士工作压力取得了明显效果。

  17. Dynamic Task-Scheduling in Grid Computing using Prioritized Round Robin Algorithm

    Directory of Open Access Journals (Sweden)

    Sunita Bansal

    2011-03-01

    Full Text Available Over the years, grid computing has emerged as one of the most viable and scalable alternatives to high performance supercomputing, tapping into computing power of the order of Gigaflops. However, the inherent dynamicity in grid computing has made it extremely difficult to come up with near-optimal solutions to efficiently schedule tasks in grids. The present paper proposes a novel grid-scheduling heuristic that adaptively and dynamically schedules tasks without requiring any prior information on the workload of incoming tasks. The approach models the grid system in the form of a state-transition diagram, employing a prioritized round-robin algorithm with task replication to optimally schedule tasks, using prediction information on processor utilization of individual nodes. Simulations, comparing the proposed approach with the round-robin heuristic, have shown the given heuristic to be more effective in scheduling tasks as compared to the latter.

  18. Efficient Qos Based Resource Scheduling Using PAPRIKA Method for Cloud Computing

    Directory of Open Access Journals (Sweden)

    Hilda Lawrance

    2013-03-01

    Full Text Available Cloud computing is increasingly been used in enterprises and business markets for serving demanding jobs. The performance of resource scheduling in cloud computing is important due to the increase in number of users, services and type of services. Resource scheduling is influenced by many factors such as CPU speed, memory, bandwidth etc. Therefore resource scheduling can be modeled as a multi criteria decision making problem. This study proposes an efficient QoS based resource scheduling algorithm using potentially all pair-wise rankings of all possible alternatives (PAPRIKA. The tasks are arranged based on the QoS parameters and the resources are allocated to the appropriate tasks based on PAPRIKA method and user satisfaction. The scheduling algorithm was simulated with cloudsim tool package. The experiment shows that, the algorithm reduces task completion time and improves resource utility rate.

  19. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  20. BEE COLONIES APPLIED TO MULTIPROCESSOR SCHEDULING

    OpenAIRE

    Butt, Nouman

    2009-01-01

    In order to achieve the high performance, we need to have an efficient scheduling of a parallelprogram onto the processors in multiprocessor systems that minimizes the entire executiontime. This problem of multiprocessor scheduling can be stated as finding a schedule for ageneral task graph to be executed on a multiprocessor system so that the schedule length can be minimize [10]. This scheduling problem is known to be NP- Hard.In multi processor task scheduling, we have a number of CPU’s on ...

  1. Susceptibility of optimal train schedules to stochastic disturbances of process times

    DEFF Research Database (Denmark)

    Larsen, Rune; Pranzo, Marco; D’Ariano, Andrea;

    2013-01-01

    This work focuses on the stochastic evaluation of train schedules computed by a microscopic scheduler of railway operations based on deterministic information. The research question is to assess the degree of sensitivity of various rescheduling algorithms to variations in process times (running...... and dwell times). In fact, the objective of railway traffic management is to reduce delay propagation and to increase disturbance robustness of train schedules at a network scale. We present a quantitative study of traffic disturbances and their effects on the schedules computed by simple and advanced...

  2. Study on Cloud Computing Resource Scheduling Strategy Based on the Ant Colony Optimization Algorithm

    Directory of Open Access Journals (Sweden)

    Lingna He

    2012-09-01

    Full Text Available In order to replace the traditional Internet software usage patterns and enterprise management mode, this paper proposes a new business calculation mode- cloud computing, resources scheduling strategy is the key technology in cloud computing, Based on the study of cloud computing system structure and the mode of operation, The key research for cloud computing the process of the work scheduling and resource allocation problems based on ant colony algorithm , Detailed analysis and design of the specific implementation for cloud resources scheduling . And in CloudSim simulation environment and simulation experiments, the results show that the algorithm has better scheduling performance and load balance than general algorithm.

  3. Ear Infection Treatment: Do Alternative Therapies Work?

    Science.gov (United States)

    ... in books and magazines. They include chiropractic adjustments, homeopathy, herbal eardrops and others. Perhaps you're seeking ... infection treatments have been studied with mixed results. Homeopathy. A controversial treatment for ear infection, homeopathy involves ...

  4. Magnetostrictive Alternator

    Science.gov (United States)

    Dyson, Rodger; Bruder, Geoffrey

    2013-01-01

    This innovation replaces the linear alternator presently used in Stirling engines with a continuous-gradient, impedance-matched, oscillating magnetostrictive transducer that eliminates all moving parts via compression, maintains high efficiency, costs less to manufacture, reduces mass, and eliminates the need for a bearing system. The key components of this new technology are the use of stacked magnetostrictive materials, such as Terfenol-D, under a biased magnetic and stress-induced compression, continuous-gradient impedance-matching material, coils, force-focusing metallic structure, and supports. The acoustic energy from the engine travels through an impedancematching layer that is physically connected to the magnetostrictive mass. Compression bolts keep the structure under compressive strain, allowing for the micron-scale compression of the magnetostrictive material and eliminating the need for bearings. The relatively large millimeter displacement of the pressure side of the impedance-matching material is reduced to micron motion, and undergoes stress amplification at the magnetostrictive interface. The alternating compression and expansion of the magnetostrictive material creates an alternating magnetic field that then induces an electric current in a coil that is wound around the stack. This produces electrical power from the acoustic pressure wave and, if the resonant frequency is tuned to match the engine, can replace the linear alternator that is commonly used.

  5. Growing Alternatives

    DEFF Research Database (Denmark)

    Bagger-Petersen, Mai Corlin

    2014-01-01

    From 2014, Anhui Province will pilot a reform of the residential land market in China, thus integrating rural Anhui in the national housing market. In contrast, artist and activist Ou Ning has proposed the Bishan time money currency, intending to establish an alternative economic circuit in Bishan...

  6. Alternative Treatments

    Science.gov (United States)

    ... triglyceride (fat) produced by processing coconut oil or palm kernel oil. The body breaks down caprylic acid into substances called “ketone bodies.” The theory behind Axona is that the ketone bodies derived from caprylic acid may provide an alternative energy source for brain cells that have lost ...

  7. A Metaheuristic Scheduler for Time Division Multiplexed Network-on-Chip

    DEFF Research Database (Denmark)

    Sørensen, Rasmus Bo; Sparsø, Jens; Pedersen, Mark Ruvald;

    2014-01-01

    This paper presents a metaheuristic scheduler for inter-processor communication in multi-processor platforms using time division multiplexed (TDM) networks on chip (NOC). Compared to previous works, the scheduler handles a broader and more general class of platforms. Another contribution, which has...

  8. The Effects of Varying Schedules of Incentive Delivery on Technical Training.

    Science.gov (United States)

    Pritchard, Robert D.; And Others

    The research reported here was initiated and designed to assess the impact of various schedules of incentive delivery (schedules of reinforcement) on performance and attitudes in an Air Force-related setting. Civilian subjects matching the characteristics of Air Force trainees were hired to work for four weeks, one week under each of four…

  9. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1996-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the US Department of Energy (DOE). This document contains the planned 1996 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project.

  10. A scheduling model for astronomy

    Science.gov (United States)

    Solar, M.; Michelon, P.; Avarias, J.; Garces, M.

    2016-04-01

    Astronomical scheduling problem has several external conditions that change dynamically at any time during observations, like weather condition (humidity, temperature, wind speed, opacity, etc.), and target visibility conditions (target over the horizon, Sun/Moon blocking the target). Therefore, a dynamic re-scheduling is needed. An astronomical project will be scheduled as one or more Scheduling Blocks (SBs) as an atomic unit of astronomical observations. We propose a mixed integer linear programming (MILP) solution to select the best SBs, favors SBs with high scientific values, and thus maximizing the quantity of completed observation projects. The data content of Atacama Large Millimeter/Submillimeter Array (ALMA) projects of cycle 0 and cycle 1 were analyzed, and a synthetic set of tests of the real instances was created. Two configurations, one of 5000 SBs in a 3 months season and another 10,000 SBs a 6 months season were created. These instances were evaluated with excellent results. Through the testing it is showed that the MILP proposal has optimal solutions.

  11. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    Dynamic models of congestion so far rely on exogenous scheduling preferences of travelers, based for example on disutility of deviation from a preferred departure or arrival time for a trip. This paper provides a more fundamental view in which travelers derive utility just from consumption and le...

  12. The CHI 2013 interactive schedule

    DEFF Research Database (Denmark)

    Satyanarayan, Arvind; Strazzulla, Daniel; Klokmose, Clemens Nylandsted

    2013-01-01

    is available. The CHI'13 Interactive Schedule helps attendees navigate this wealth of video content in order to identify events they would like to attend. It consists of a number of large display screens throughout the conference venue which cycle through a video playlist of events. Attendees can interact...

  13. Cooperation in Networks and Scheduling

    NARCIS (Netherlands)

    van Velzen, S.

    2005-01-01

    This thesis deals with various models of cooperation in networks and scheduling. The main focus is how the benefits of this cooperation should be divided among the participating individuals. A major part of this analysis is concerned with stability of the cooperation. In addition, allocation rules a

  14. From Schedule Push to Reality Pull: Reality Pull prefers Retail

    NARCIS (Netherlands)

    Reep, Frans van der

    2005-01-01

    The Internet is changing the way we organise work. It is shifting the requirement for what we call the ‘schedule push’ and the hierarchical organisation that it implies, and therefore it is removing the type of control that is conventionally used to match resources to tasks, and customer demand to s

  15. Verification and optimization of a PLC control schedule

    NARCIS (Netherlands)

    Brinksma, Ed; Mader, Angelika; Fehnker, Ansgar

    2002-01-01

    We report on the use of model checking techniques for both the verification of a process control program and the derivation of optimal control schedules. Most of this work has been carried out as part of a case study for the EU VHS project (Verification of Hybrid Systems), in which the program for a

  16. Standardization of Alternative Fuels. Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-08-15

    March 2003 the Executive Committee of the International Energy Agency's Implementing Agreement on Advanced Motor fuels (IEA/AMF) decided to continue annex XXVII 'Standardization of alternative fuels' with a second phase. The purpose of the second phase was to go further in the contacts with the International Organization for Standardization (ISO) as well as the European Committee for Standardization (CEN) and their technical committees, to better understand their needs and to investigate how IEA/AMF could contribute to their work. It was also scheduled to put forward proposals on how IEA/AMF could cooperate with CEN and ISO and their technical committees (TC: s), primarily ISO/TC 28 'Petroleum Products and Lubricants' and CEN/TC 19 'Petroleum Products, Lubricants and Related Products'. The main part of the work in IEA/AMF annex XXVII phase two has focused on personal contacts within CEN/TC 19 and ISO/TC 28, but also on data and information collection from websites and written information. Together with the analysis of this information, the internal organization of a cooperation between IEA/AMF and ISO/TC 28 and of a cooperation between IEA/AMF and CEN/TC 19 have also been discussed and analysed.

  17. 78 FR 73471 - Refuge Alternatives for Underground Coal Mines

    Science.gov (United States)

    2013-12-06

    ... Coal Mines AGENCY: Mine Safety and Health Administration, Labor. ACTION: Request for information...) on Refuge Alternatives for Underground Coal Mines. This extension gives interested parties additional... Alternatives for Underground Coal Mines. The RFI comment period was originally scheduled to close on October...

  18. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... Everyone: Easy-to-read Schedules Infants and Children Preteens and Teens Adults Display Immunization Schedules and Quiz ... file Microsoft Word file Microsoft Excel file Audio/Video file Apple Quicktime file RealPlayer file Text file ...

  19. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  20. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  1. Web-Enabled Framework for Real-Time Scheduler Simulator: A Teaching Too

    Directory of Open Access Journals (Sweden)

    C. Yaashuwanth

    2010-01-01

    Full Text Available Problem statement: A Real-Time System (RTS is one which controls an environment by receiving data, processing it, and returning the results quickly enough to affect the functioning of the environment at that time. The main objective of this research was to develop an architectural model for the simulation of real time tasks to implement in distributed environment through web, and to make comparison between various scheduling algorithms. The proposed model can be used for preprogrammed scheduling policies for uniprocessor systems. This model provided user friendly Graphical User Interface (GUI. Approach: Though a lot of scheduling algorithms have been developed, just a few of them are available to be implemented in real-time applications. In order to use, test and evaluate a scheduling policy it must be integrated into an operating system, which is a complex task. Simulation is another alternative to evaluate a scheduling policy. Unfortunately, just a few real-time scheduling simulators have been developed to date and most of them require the use of a specific simulation language. Results: Task ID, deadline, priority, period, computation time and phase are the input task attributes to the scheduler simulator and chronograph imitating the real-time execution of the input task set and computational statistics of the schedule are the output. Conclusion: The Web-enabled framework proposed in this study gave the developer to evaluate the schedulability of the real time application. Numerous benefits were quoted in support of the Web-based deployment. The proposed framework can be used as an invaluable teaching tool. Further, the GUI of the framework will allow for easy comparison of the framework of existing scheduling policies and also simulate the behavior and verify the suitability of custom defined schedulers for real-time applications.

  2. Throughput versus Fairness: Channel-Aware Scheduling in Multiple Antenna Downlink

    Directory of Open Access Journals (Sweden)

    Sezgin Aydin

    2009-01-01

    Full Text Available Abstract Channel aware and opportunistic scheduling algorithms exploit the channel knowledge and fading to increase the average throughput. Alternatively, each user could be served equally in order to maximize fairness. Obviously, there is a tradeoff between average throughput and fairness in the system. In this paper, we study four representative schedulers, namely the maximum throughput scheduler (MTS, the proportional fair scheduler (PFS, the (relative opportunistic round robin scheduler (ORS, and the round robin scheduler (RRS for a space-time coded multiple antenna downlink system. The system applies TDMA based scheduling and exploits the multiple antennas in terms of spatial diversity. We show that the average sum rate performance and the average worst-case delay depend strongly on the user distribution within the cell. MTS gains from asymmetrical distributed users whereas the other three schedulers suffer. On the other hand, the average fairness of MTS and PFS decreases with asymmetrical user distribution. The key contribution of this paper is to put these tradeoffs and observations on a solid theoretical basis. Both the PFS and the ORS provide a reasonable performance in terms of throughput and fairness. However, PFS outperforms ORS for symmetrical user distributions, whereas ORS outperforms PFS for asymmetrical user distribution.

  3. Throughput versus Fairness: Channel-Aware Scheduling in Multiple Antenna Downlink

    Directory of Open Access Journals (Sweden)

    2009-03-01

    Full Text Available Channel aware and opportunistic scheduling algorithms exploit the channel knowledge and fading to increase the average throughput. Alternatively, each user could be served equally in order to maximize fairness. Obviously, there is a tradeoff between average throughput and fairness in the system. In this paper, we study four representative schedulers, namely the maximum throughput scheduler (MTS, the proportional fair scheduler (PFS, the (relative opportunistic round robin scheduler (ORS, and the round robin scheduler (RRS for a space-time coded multiple antenna downlink system. The system applies TDMA based scheduling and exploits the multiple antennas in terms of spatial diversity. We show that the average sum rate performance and the average worst-case delay depend strongly on the user distribution within the cell. MTS gains from asymmetrical distributed users whereas the other three schedulers suffer. On the other hand, the average fairness of MTS and PFS decreases with asymmetrical user distribution. The key contribution of this paper is to put these tradeoffs and observations on a solid theoretical basis. Both the PFS and the ORS provide a reasonable performance in terms of throughput and fairness. However, PFS outperforms ORS for symmetrical user distributions, whereas ORS outperforms PFS for asymmetrical user distribution.

  4. HOW GOOD IS A DENSE SHOP SCHEDULE?

    Institute of Scientific and Technical Information of China (English)

    陈礴; 俞文(鱼此)

    2001-01-01

    In this paper, we study a class of simple and easy-to-construct shop schedules, known as dense schedules. We present tight bounds on the maximum deviation in makespan of dense flow-shop and job-shop schedules from their optimal ones. For dense open-shop schedules, we do the same for the special case of four machines and thus add a stronger supporting case for proving a standing conjecture.

  5. Opportunistic splitting for scheduling using a score-based approach

    KAUST Repository

    Rashid, Faraan

    2012-06-01

    We consider the problem of scheduling a user in a multi-user wireless environment in a distributed manner. The opportunistic splitting algorithm is applied to find the best group of users without reporting the channel state information to the centralized scheduler. The users find the best among themselves while requiring just a ternary feedback from the common receiver at the end of each mini-slot. The original splitting algorithm is modified to handle users with asymmetric channel conditions. We use a score-based approach with the splitting algorithm to introduce time and throughput fairness while exploiting the multi-user diversity of the network. Analytical and simulation results are given to show that the modified score-based splitting algorithm works well as a fair scheduling scheme with good spectral efficiency and reduced feedback. © 2012 IEEE.

  6. Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-05-23

    This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

  7. Optimal physicians schedule in an Intensive Care Unit

    Science.gov (United States)

    Hidri, L.; Labidi, M.

    2016-05-01

    In this paper, we consider a case study for the problem of physicians scheduling in an Intensive Care Unit (ICU). The objective is to minimize the total overtime under complex constraints. The considered ICU is composed of three buildings and the physicians are divided accordingly into six teams. The workload is assigned to each team under a set of constraints. The studied problem is composed of two simultaneous phases: composing teams and assigning the workload to each one of them. This constitutes an additional major hardness compared to the two phase's process: composing teams and after that assigning the workload. The physicians schedule in this ICU is used to be done manually each month. In this work, the studied physician scheduling problem is formulated as an integer linear program and solved optimally using state of the art software. The preliminary experimental results show that 50% of the overtime can be saved.

  8. Real-time and dynamic schedule optimization of construction projects on the basis of lean construction

    Institute of Scientific and Technical Information of China (English)

    QI Shen-jun; DING Lie-yun; LUO Han-bin; DONG Xiao-yan

    2007-01-01

    Lean construction has been newly applied to construction industry. The best performance of a project can be achieved through the precise definition of construction product, rational work break structure, lean supply chain, decrease of resources waste, objective control and so forth. Referring to the characteristics of schedule planning of construction projects and lean construction philosophy, we proposed optimizing methodology of real-time and dynamic schedule of construction projects based on lean construction. The basis of the methodology is process reorganization and lean supply in construction enterprises. The traditional estimating method of the activity duration is fuzzy and random; however, a newly proposed lean forecasting method employs multi-components linear-regression, back-propagation artificial neural networks and learning curve. Taking account of the limited resources and the fixed duration of a project, the optimizing method of the real-time and dynamic schedule adopts the concept of resource driving. To optimize the schedule of a construction project timely and effectively, an intellectualized schedule management system was developed. It can work out the initial schedule, optimize the real-time and dynamic schedule, and display the schedule with the Gant Chart, the net-work graph and the space-time line chart. A case study was also presented to explain the proposed method.

  9. Throughput Optimal Scheduling with Feedback Cost Reduction

    CERN Document Server

    Karaca, Mehmet; Ercetin, Ozgur; Alpcan, Tansu; Boche, Holger

    2012-01-01

    It is well known that opportunistic scheduling algorithms are throughput optimal under full knowledge of channel and network conditions. However, these algorithms achieve a hypothetical achievable rate region which does not take into account the overhead associated with channel probing and feedback required to obtain the full channel state information at every slot. We adopt a channel probing model where $\\beta$ fraction of time slot is consumed for acquiring the channel state information (CSI) of a single channel. In this work, we design a joint scheduling and channel probing algorithm named SDF by considering the overhead of obtaining the channel state information. We analytically prove that when the number of users in the network is greater than 3, then SDF algorithm can achieve $1+\\epsilon$ of the full rate region achieved when all users are probed. We also demonstrate numerically in a realistic simulation setting that this rate region can be achieved by probing only less than 50% of all channels in a CDM...

  10. A Market-Based Approach to Multi-factory Scheduling

    Science.gov (United States)

    Vytelingum, Perukrishnen; Rogers, Alex; MacBeth, Douglas K.; Dutta, Partha; Stranjak, Armin; Jennings, Nicholas R.

    In this paper, we report on the design of a novel market-based approach for decentralised scheduling across multiple factories. Specifically, because of the limitations of scheduling in a centralised manner - which requires a center to have complete and perfect information for optimality and the truthful revelation of potentially commercially private preferences to that center - we advocate an informationally decentralised approach that is both agile and dynamic. In particular, this work adopts a market-based approach for decentralised scheduling by considering the different stakeholders representing different factories as self-interested, profit-motivated economic agents that trade resources for the scheduling of jobs. The overall schedule of these jobs is then an emergent behaviour of the strategic interaction of these trading agents bidding for resources in a market based on limited information and their own preferences. Using a simple (zero-intelligence) bidding strategy, we empirically demonstrate that our market-based approach achieves a lower bound efficiency of 84%. This represents a trade-off between a reasonable level of efficiency (compared to a centralised approach) and the desirable benefits of a decentralised solution.

  11. Prediction based proactive thermal virtual machine scheduling in green clouds.

    Science.gov (United States)

    Kinger, Supriya; Kumar, Rajesh; Sharma, Anju

    2014-01-01

    Cloud computing has rapidly emerged as a widely accepted computing paradigm, but the research on Cloud computing is still at an early stage. Cloud computing provides many advanced features but it still has some shortcomings such as relatively high operating cost and environmental hazards like increasing carbon footprints. These hazards can be reduced up to some extent by efficient scheduling of Cloud resources. Working temperature on which a machine is currently running can be taken as a criterion for Virtual Machine (VM) scheduling. This paper proposes a new proactive technique that considers current and maximum threshold temperature of Server Machines (SMs) before making scheduling decisions with the help of a temperature predictor, so that maximum temperature is never reached. Different workload scenarios have been taken into consideration. The results obtained show that the proposed system is better than existing systems of VM scheduling, which does not consider current temperature of nodes before making scheduling decisions. Thus, a reduction in need of cooling systems for a Cloud environment has been obtained and validated.

  12. Prediction Based Proactive Thermal Virtual Machine Scheduling in Green Clouds

    Directory of Open Access Journals (Sweden)

    Supriya Kinger

    2014-01-01

    Full Text Available Cloud computing has rapidly emerged as a widely accepted computing paradigm, but the research on Cloud computing is still at an early stage. Cloud computing provides many advanced features but it still has some shortcomings such as relatively high operating cost and environmental hazards like increasing carbon footprints. These hazards can be reduced up to some extent by efficient scheduling of Cloud resources. Working temperature on which a machine is currently running can be taken as a criterion for Virtual Machine (VM scheduling. This paper proposes a new proactive technique that considers current and maximum threshold temperature of Server Machines (SMs before making scheduling decisions with the help of a temperature predictor, so that maximum temperature is never reached. Different workload scenarios have been taken into consideration. The results obtained show that the proposed system is better than existing systems of VM scheduling, which does not consider current temperature of nodes before making scheduling decisions. Thus, a reduction in need of cooling systems for a Cloud environment has been obtained and validated.

  13. Scheduling multirobot operations in manufacturing by truncated Petri nets

    Science.gov (United States)

    Chen, Qin; Luh, J. Y.

    1995-08-01

    Scheduling of operational sequences in manufacturing processes is one of the important problems in automation. Methods of applying Petri nets to model and analyze the problem with constraints on precedence relations, multiple resources allocation, etc. have been available in literature. Searching for an optimum schedule can be implemented by combining the branch-and-bound technique with the execution of the timed Petri net. The process usually produces a large Petri net which is practically not manageable. This disadvantage, however, can be handled by a truncation technique which divides the original large Petri net into several smaller size subnets. The complexity involved in the analysis of each subnet individually is greatly reduced. However, when the locally optimum schedules of the resulting subnets are combined together, it may not yield an overall optimum schedule for the original Petri net. To circumvent this problem, algorithms are developed based on the concepts of Petri net execution and modified branch-and-bound process. The developed technique is applied to a multi-robot task scheduling problem of the manufacturing work cell.

  14. Weirton Steel Corporation logistics and integrated scheduling. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Guzzetta, M.B. [comp.

    1996-06-01

    In order to remain competitive in the changing steel market, US steel producers restructured by taking on foreign and domestic partners, closing facilities and/or trimming work forces, and modernizing their steel making facilities. However, very little was done to develop production management technology to complement these changes. The Logistics and Integrated Scheduling program (LIS) was undertaken to address this issue. LIS is an information management system that delivers better customer service, better quality materials, and a just-in-time delivery system. It involves three major components: (1) material marking and sensing: advanced R&D applied to determining cost effective, feasible solutions to passive inventory; (2) material inventory and tracking: advanced technology applied to managing inventory movement; (3) planning and scheduling: beginning with annual production plans, order management, and operational constraints, the ability to build integrated schedules capable of pull through and push through scheduling for various plant capability levels and location configurations with rapid turnaround capability. LIS provides accurate, automated tracking of material flows throughout the mill, the collection and analysis of production data, and automated schedule optimization.

  15. An Integrated Expert System for Linear Scheduling Heavy Earthmoving Operations

    Directory of Open Access Journals (Sweden)

    Nizar Markiz

    2016-01-01

    Full Text Available Heavy earthmoving operations are repetitive in nature and vulnerable to time-related restraints and uncertainties. Therefore, at the conceptual stage, scheduling these operations can take a linear form, known as linear schedule or line of balance (LOB. In such type of work, generating a preliminary line of balance for variable sequencing of activities is crucial. In this paper, an integrated expert system for determining preliminary linear schedules for heavy earthmoving operations at the conceptual stage is presented. The proposed system incorporates numerous factors that influence the analysis of earthmoving operations, which include geological and topographical parameters used to determine productivity rates at the conceptual stage. Also, the proposed system is capable of automatically generating a line of balance based on a stochastic scheduling technique via the metaheuristic simulated annealing intelligent approach to incorporate randomness and uncertainties in performing the associated activities. A parametric analysis is conducted in order to quantify the system’s degree of accuracy. An actual case project is then utilized to illustrate its numerical capabilities. Generating accurate linear schedules for heavy earthmoving operations at the conceptual design stage is anticipated to be of major significance to infrastructure project stakeholders, engineers, and construction managers by detecting schedule’s conflicts early in order to enhance overall operational logistics.

  16. Optimization of Daily Flight Training Schedules

    Science.gov (United States)

    2014-03-01

    training syllabus . 14. SUBJECT TERMS Scheduling, optimization, flight training, Advance Strike Training, pilot 15. NUMBER OF...SKEDSOs that can help them increase throughput of students in the advanced strike training syllabus . vi THIS PAGE INTENTIONALLY LEFT BLANK vii...instructor pilots with student naval aviators to achieve syllabus events. The schedule is built manually each day by squadron scheduling officers (SKEDSOs

  17. 19 CFR 122.63 - Scheduled airlines.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Scheduled airlines. 122.63 Section 122.63 Customs... AIR COMMERCE REGULATIONS Clearance of Aircraft and Permission To Depart § 122.63 Scheduled airlines... scheduled airlines covered by this subpart. (a) Clearance at other than airport of final departure....

  18. Response Strength in Extreme Multiple Schedules

    Science.gov (United States)

    McLean, Anthony P.; Grace, Randolph C.; Nevin, John A.

    2012-01-01

    Four pigeons were trained in a series of two-component multiple schedules. Reinforcers were scheduled with random-interval schedules. The ratio of arranged reinforcer rates in the two components was varied over 4 log units, a much wider range than previously studied. When performance appeared stable, prefeeding tests were conducted to assess…

  19. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River Basin Commission. ACTION: Notice... Regulations--Water Supply Charges to revise the schedule of water charges. DATES: The Commission will hold a... the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please contact...

  20. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board... publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to the Board's regulations..., the Board's General Manager will update the FOIA Fee Schedule once every 12 months. The previous...

  1. Rate-optimal scheduling of recursive DSP algorithms based on the scheduling-range chart

    NARCIS (Netherlands)

    Heemstra de Groot, Sonia M.; Herrmann, Otto E.

    1990-01-01

    A method for rate-optimal scheduling of recursive DSP algorithms is presented. The approach is based on the determination of the scheduling window of each operation and the construction of a scheduling-range chart. The information in the chart is used during scheduling to optimize some quality crite

  2. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  3. Building Better Nurse Scheduling Algorithms

    CERN Document Server

    Aickelin, Uwe

    2008-01-01

    The aim of this research is twofold: Firstly, to model and solve a complex nurse scheduling problem with an integer programming formulation and evolutionary algorithms. Secondly, to detail a novel statistical method of comparing and hence building better scheduling algorithms by identifying successful algorithm modifications. The comparison method captures the results of algorithms in a single figure that can then be compared using traditional statistical techniques. Thus, the proposed method of comparing algorithms is an objective procedure designed to assist in the process of improving an algorithm. This is achieved even when some results are non-numeric or missing due to infeasibility. The final algorithm outperforms all previous evolutionary algorithms, which relied on human expertise for modification.

  4. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  5. Scheduling and adaptation of London's future water supply and demand schemes under uncertainty

    Science.gov (United States)

    Huskova, Ivana; Matrosov, Evgenii S.; Harou, Julien J.; Kasprzyk, Joseph R.; Reed, Patrick M.

    2015-04-01

    The changing needs of society and the uncertainty of future conditions complicate the planning of future water infrastructure and its operating policies. These systems must meet the multi-sector demands of a range of stakeholders whose objectives often conflict. Understanding these conflicts requires exploring many alternative plans to identify possible compromise solutions and important system trade-offs. The uncertainties associated with future conditions such as climate change and population growth challenge the decision making process. Ideally planners should consider portfolios of supply and demand management schemes represented as dynamic trajectories over time able to adapt to the changing environment whilst considering many system goals and plausible futures. Decisions can be scheduled and adapted over the planning period to minimize the present cost of portfolios while maintaining the supply-demand balance and ecosystem services as the future unfolds. Yet such plans are difficult to identify due to the large number of alternative plans to choose from, the uncertainty of future conditions and the computational complexity of such problems. Our study optimizes London's future water supply system investments as well as their scheduling and adaptation over time using many-objective scenario optimization, an efficient water resource system simulator, and visual analytics for exploring key system trade-offs. The solutions are compared to Pareto approximate portfolios obtained from previous work where the composition of infrastructure portfolios that did not change over the planning period. We explore how the visual analysis of solutions can aid decision making by investigating the implied performance trade-offs and how the individual schemes and their trajectories present in the Pareto approximate portfolios affect the system's behaviour. By doing so decision makers are given the opportunity to decide the balance between many system goals a posteriori as well as

  6. Bayesian Optimisation Algorithm for Nurse Scheduling

    CERN Document Server

    Li, Jingpeng

    2008-01-01

    Our research has shown that schedules can be built mimicking a human scheduler by using a set of rules that involve domain knowledge. This chapter presents a Bayesian Optimization Algorithm (BOA) for the nurse scheduling problem that chooses such suitable scheduling rules from a set for each nurses assignment. Based on the idea of using probabilistic models, the BOA builds a Bayesian network for the set of promising solutions and samples these networks to generate new candidate solutions. Computational results from 52 real data instances demonstrate the success of this approach. It is also suggested that the learning mechanism in the proposed algorithm may be suitable for other scheduling problems.

  7. Grouping Based Job Scheduling Algorithm Using Priority Queue and Hybrid Algorithm in Grid Computing

    Directory of Open Access Journals (Sweden)

    Pinky Rosemarry

    2013-01-01

    Full Text Available Grid computing enlarge with computing platform which is collection of heterogeneous computing resources connected by a network across dynamic and geographically dispersed organization to form a distributed high performance computing infrastructure. Grid computing solves the complex computing problems amongst multiple machines. Grid computing solves the large scale computational demands in a high performance computing environment. The main emphasis in the grid computing is given to the resource management and the job scheduler .The goal of the job scheduler is to maximize the resource utilization and minimize the processing time of the jobs. Existing approaches of Grid scheduling doesn’t give much emphasis on the performance of a Grid scheduler in processing time parameter. Schedulers allocate resources to the jobs to be executed using the First come First serve algorithm. In this paper, we have provided an optimize algorithm to queue of the scheduler using various scheduling methods like Shortest Job First, First in First out, Round robin. The job scheduling system is responsible to select best suitable machines in a grid for user jobs. The management and scheduling system generates job schedules for each machine in the grid by taking static restrictions and dynamic parameters of jobs and machinesinto consideration. The main purpose of this paper is to develop an efficient job scheduling algorithm to maximize the resource utilization and minimize processing time of the jobs. Queues can be optimized byusing various scheduling algorithms depending upon the performance criteria to be improved e.g. response time, throughput. The work has been done in MATLAB using the parallel computing toolbox.

  8. Taking the lag out of jet lag through model-based schedule design.

    Directory of Open Access Journals (Sweden)

    Dennis A Dean

    2009-06-01

    Full Text Available Travel across multiple time zones results in desynchronization of environmental time cues and the sleep-wake schedule from their normal phase relationships with the endogenous circadian system. Circadian misalignment can result in poor neurobehavioral performance, decreased sleep efficiency, and inappropriately timed physiological signals including gastrointestinal activity and hormone release. Frequent and repeated transmeridian travel is associated with long-term cognitive deficits, and rodents experimentally exposed to repeated schedule shifts have increased death rates. One approach to reduce the short-term circadian, sleep-wake, and performance problems is to use mathematical models of the circadian pacemaker to design countermeasures that rapidly shift the circadian pacemaker to align with the new schedule. In this paper, the use of mathematical models to design sleep-wake and countermeasure schedules for improved performance is demonstrated. We present an approach to designing interventions that combines an algorithm for optimal placement of countermeasures with a novel mode of schedule representation. With these methods, rapid circadian resynchrony and the resulting improvement in neurobehavioral performance can be quickly achieved even after moderate to large shifts in the sleep-wake schedule. The key schedule design inputs are endogenous circadian period length, desired sleep-wake schedule, length of intervention, background light level, and countermeasure strength. The new schedule representation facilitates schedule design, simulation studies, and experiment design and significantly decreases the amount of time to design an appropriate intervention. The method presented in this paper has direct implications for designing jet lag, shift-work, and non-24-hour schedules, including scheduling for extreme environments, such as in space, undersea, or in polar regions.

  9. Simplified Scheduling for Underwater Acoustic Networks

    Directory of Open Access Journals (Sweden)

    Wouter van Kleunen

    2013-01-01

    Full Text Available The acoustic propagation speed under water poses significant challenges to the design of underwater sensor networks and their medium access control protocols. Similar to the air, scheduling transmissions under water has significant impact on throughput, energy consumption, and reliability. In this paper we present an extended set of simplified scheduling constraints which allows easy scheduling of underwater acoustic communication. We also present two algorithms for scheduling communications, i.e. a centralized scheduling approach and a distributed scheduling approach. The centralized approach achieves the highest throughput while the distributed approach aims to minimize the computation and communication overhead. We further show how the centralized scheduling approach can be extended with transmission dependencies to reduce the end-to-end delay of packets. We evaluate the performance of the centralized and distributed scheduling approaches using simulation. The centralized approach outperforms the distributed approach in terms of throughput, however we also show the distributed approach has significant benefits in terms of communication and computational overhead required to setup the schedule. We propose a novel way of estimating the performance of scheduling approaches using the ratio of modulation time and propagation delay. We show the performance is largely dictated by this ratio, although the number of links to be scheduled also has a minor impact on the performance.

  10. Study on shift schedule saving energy of automatic transmission of ground vehicles

    Institute of Scientific and Technical Information of China (English)

    龚捷; 赵丁选; 陈鹰; 陈宁

    2004-01-01

    To improve ground vehicle efficiency, shift schedule energy saving was proposed for the ground vehicle automatic transmission by studying the function of the torque converter and transmission in the vehicular drivetrain. The shift schedule can keep the torque converter working in the high efficiency range under all the working conditions except in the low efficiency range on the left when the transmission worked at the lowest shift, and in the low efficiency range on the right when the transmission worked at the highest shift. The shift quality key factors were analysed. The automatic trans-mission's bench-test adopting this shift schedule was made on the automatic transmission's test-bed. The experimental results showed that the shift schedule was correct and that the shift quality was controllable.

  11. Study on shift schedule saving energy of automatic transmission of ground vehicles

    Institute of Scientific and Technical Information of China (English)

    龚捷; 赵丁选; 陈鹰; 陈宁

    2004-01-01

    To improve ground vehicle efficiency,shift schedule energy saving was proposed for the ground vehicle automatic transmission by studying the function of the torque converter and transmission in the vehicular drivetrain.The shift schedule can keep the torque converter working in the high efficiency range under all the working conditions except in the low efficiency range on the left when the transmission worked at the lowest shift,and in the low efficiency range on the right when the transmission worked at the highest shift.The shift quality key factors were analysed.The automatic transmission's bench-test adopting this shift schedule was made on the automatic transmission's test-bed.The experimental results showed that the shift schedule was correct and that the shift quality was controllable.

  12. Routine environmental monitoring schedule, calendar year 1995

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995.

  13. Reactive Scheduling in Multipurpose Batch Plants

    Science.gov (United States)

    Narayani, A.; Shaik, Munawar A.

    2010-10-01

    Scheduling is an important operation in process industries for improving resource utilization resulting in direct economic benefits. It has a two-fold objective of fulfilling customer orders within the specified time as well as maximizing the plant profit. Unexpected disturbances such as machine breakdown, arrival of rush orders and cancellation of orders affect the schedule of the plant. Reactive scheduling is generation of a new schedule which has minimum deviation from the original schedule in spite of the occurrence of unexpected events in the plant operation. Recently, Shaik & Floudas (2009) proposed a novel unified model for short-term scheduling of multipurpose batch plants using unit-specific event-based continuous time representation. In this paper, we extend the model of Shaik & Floudas (2009) to handle reactive scheduling.

  14. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    (schedules expected to perform well after some degree of modification when the environment changes). This thesis presents two fundamentally different approaches for scheduling job shops facing machine breakdowns. The first method is called neighbourhood based robustness and is based on an idea of minimising...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...... suboptimal when it is implemented and subjected to the uncertainty of the real world. For this reason it is very important to find methods capable of creating robust schedules (schedules expected to perform well after a minimal amount of modification when the environment changes) or flexible schedules...

  15. Project scheduling with resources constraints: application in the equipment production for the oil industry; Scheduling de projetos com restricao de recursos: aplicacao na producao de equipamentos para a industria de petroleo

    Energy Technology Data Exchange (ETDEWEB)

    Cruz, Carolina A.O.; Ferreira Filho, Virgilio J.M. [Universidade Federal do Rio de Janeiro (UFRJ), Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia (COPPE)

    2008-07-01

    One of the essential steps in the main scope Project Management is the Time Management made by the planning and control of the project schedule. In this work is presented the resource constrained scheduling problem beyond its mathematical formulation and a review of papers about this issue. In sequence is presented a practical example of this model considering a simplified model of an engineering project schedule of oil production equipment. The results obtained with the model application are shown and the conclusions about the work with resource constrained scheduling problems. (author)

  16. Preemptive scheduling of parallel jobs on multiprocessors

    Energy Technology Data Exchange (ETDEWEB)

    Deng, Xiaotie; Gu, Nian; Brecht, T. [York Univ., North York (Canada); KaiCheng Lu [TsingHua Univ., Beijing (China)

    1996-12-31

    We study the problem of processor scheduling for parallel jobs. We prove that, for jobs with a single phase of parallelism, an algorithm can achieve a mean response time within 2 - 2/n+1 times the optimum. This is extended to jobs with multiple phases of parallelism and to interactive jobs (with phases during which the job has no CPU requirements) for a solution within 4 - 4/n+1 times the optimum. Comparing with previous work, our assumption that job execution times are unknown prior to their completion is more realistic, our multi-phased job model is more general, and our approximation ratio (for jobs with a single phase of parallelism) is better and cannot be improved.

  17. Evaluation of alternative containers to determining the working width of fertilizer spreaders Coletores alternativos para a determinação da largura de trabalho de distribuidores de fertilizantes sólidos a lanço

    Directory of Open Access Journals (Sweden)

    Marcelo A. Primo

    2008-09-01

    Full Text Available Farmers have difficult of determining the evenness of transverse distribution and the working width, due the tests with this aim require equipments and complex methodologies. So, this study evaluates some alternative containers with the aim to allow a more accessible adjustment of the full width of the solid fertilizer spreaders. Four different containers were tested: i standard container constructed in accordance with ISO 5690/1; ii container of polyethylene (plastic trays with screen shading to prevent the ricochet of material; iii containers composed by boxes of long-life milk, and iv containers composed by flowerpots (number 3.5. Also, three different spreaders were used for the tests. Alternative containers showed greater retention of particles than the standardized containers. The full width of work obtained for the coefficients of variation of 12.5; 15; 17.5 and 20%, ranged due the containers in the different pathways. The flowerpots of polyethylene showed similar results to the standardized containers. The heights of the containers were more important for its efficiency than its area of collection.Os ensaios de largura de trabalho e uniformidade de distribuição são de difícil execução para o agricultor por exigirem equipamentos, recursos e métodos complexos. Portanto, este trabalho teve como objetivo avaliar coletores alternativos para tornar mais acessível a regulagem e a avaliação de distribuidores de fertilizantes sólidos a lanço. Foram utilizados quatro diferentes conjuntos de coletores: i coletores construídos segundo a norma ISO 5690/1; ii coletores de polietileno (bandejas plásticas com tela de sombreamento para evitar o ricochete de material; iii coletores formados por caixas de leite longa vida, e iv coletores formados por vasos de polietileno (número 3,5. Também foram utilizados três diferentes distribuidores para as avaliações. Os coletores alternativos apresentaram maior retenção de partículas que os

  18. Alternative Energies

    Energy Technology Data Exchange (ETDEWEB)

    Planting, A.; De saint Jacob, Y.; Verwijs, H.; Belin, H.; Preesman, L.

    2009-03-15

    In two articles, one interview and one column attention is paid to alternative energies. The article 'A new light on saving energy' discusses the option to save energy by modernising lighting systems in urban areas. The column 'View from Paris' focuses on investment decisions in France with regard to renewable energy and energy savings. The article 'Europe turns a blind eye to big battery' discusses developments in batteries to store energy. The interview concerns fuel cell expert and formerly President of UTC Power Jan van Dokkum. The last article gives a brief overview of the European Energy Research Alliance (EERA) and the challenges this alliance will have to face with regard to climate change and energy security.

  19. The impact of alternative dispatch intervals on operating reserve requirements for variable generation

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, Michael [National Renewable Energy Lab. (NREL), Boulder, CO (United States); King, Jack [RePPAE LLC, Wexford, PA (United States); Beuning, Stephen [Xcel Energy, Denver, CO (United States); Kirby, Brendan

    2011-07-01

    In the Western Interconnection of the United States, an energy imbalance market (EIM) has been proposed. This would effectively pool the variability of load, wind, and solar generation, and other deviations in generation schedules. The proposed market would perform an economic dispatch every 5 minutes. If implemented, this would be a significant change from the hourly scheduling and dispatch that occurs throughout most of the West. We analyze the impact of alternative scheduling and dispatch intervals on three types of reserves: regulation, following/spin, and following/non-spin. We compare the existing practice of hourly scheduling and dispatch with a 40-minute advance notification with 30-minute and 10-minute scheduling and dispatch. We also analyze the impact of alternative notification periods such as 30-minute scheduling/dispatch with 10, 30, and 40-minute notifications. We find that moving from a 60-minute dispatch to a 10-minute dispatch results in a 70% saving on deployed regulation. (orig.)

  20. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo;

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker cons...... consumption and the impact on the remaining network and the customer service level. The model is applied to 4 real cases from Maersk Line. Solutions are comparable or superior to those chosen by operations managers. Cost savings of up to 58% may be achieved....

  1. Scheduling of an aircraft fleet

    Science.gov (United States)

    Paltrinieri, Massimo; Momigliano, Alberto; Torquati, Franco

    1992-01-01

    Scheduling is the task of assigning resources to operations. When the resources are mobile vehicles, they describe routes through the served stations. To emphasize such aspect, this problem is usually referred to as the routing problem. In particular, if vehicles are aircraft and stations are airports, the problem is known as aircraft routing. This paper describes the solution to such a problem developed in OMAR (Operative Management of Aircraft Routing), a system implemented by Bull HN for Alitalia. In our approach, aircraft routing is viewed as a Constraint Satisfaction Problem. The solving strategy combines network consistency and tree search techniques.

  2. Effect of pulse irrigation scheduling with hybrid station controller on fruit yield and quality of Nagpur mandarin (citrus reticulate blanco

    Directory of Open Access Journals (Sweden)

    Parameshwar Sidramappa Shirgure

    2013-01-01

    Full Text Available The hybrid station controller based automatic pulse irrigation scheduling field experiment was conducted on 10-12 years old bearing Nagpur mandarin (Citrus reticulata Blanco at National Research Center for Citrus, Nagpur during 2008-2011. The objective was to study the automatic daily irrigation scheduling as well as alternate day based on time schedule and potential evapo-transpiration through the drip irrigation. The treatments were consisted of Automatic daily irrigation daily with 60 minute interval three times (I1; Automatic irrigation daily with 90 minute interval two times (I2; Automatic irrigation at alternate day with 120 minute three times (I3; and Automatic irrigation at alternate day with 180 minute two times (I4 with six replications in Randomized Block Design. The automatic hybrid station controller E-6 (Rain Bird, USA was used for micro-irrigation schedule setting the time for each treatment based on the water need of the plant and average open pan evaporation. The various scheduling treatment timings were programmed in A, B and C programs of the hybrid station controller. The sustainable production of Nagpur mandarin is possible with drip irrigation using automatic scheduling daily or on alternate days.  The water use in October varied from 65.0-72.4 liters/day/plant and during May-June it was 133.0 - 147.7 liters/day/plant. Drip irrigation was scheduled to maintain automatically the soil moisture status above 25% (wet basis during fruit growing period. The leaf nutrient status was high with automatic alternate day drip irrigation schedule. The canopy temperature was positively influenced with automatic drip irrigation schedules.  The Nagpur mandarin fruit yield was highest (30.91 tones/ha with irrigation on alternate day 120 minutes three times, followed by irrigation scheduled with 90 minutes interval two times daily (30.11 tones/ha. Fruit weight (154.7 g, TSS (10.22 0Brix and juice percent (40.77% was found with automatic

  3. KASS v.2.2. scheduling software for construction

    Directory of Open Access Journals (Sweden)

    Krzemiński Michał

    2016-01-01

    Full Text Available The paper presents fourth version of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System. KASS software is designed for construction scheduling, specially form flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building production. The minimal time, the minimal slack of brigades, the minimal slacks of the chosen working brigade and costs of the transfer operation of working fronts are included in operational research criteria between work centers. It is possible to enter data into the program both by hand as well as to load the Excel from files, similarly is with results, they are presented on-screen as well as a possibility of enrolling them in the file exists Excel. An element is very valid for it since allows for further simple processing of received results. In providing software for performing operational research calculations a technique of the complete review and simulation technology are being exploited. Described algorithms a program is using which will stay in the article as well as shown computational examples will remain.

  4. IOPS advisor: Research in progress on knowledge-intensive methods for irregular operations airline scheduling

    Science.gov (United States)

    Borse, John E.; Owens, Christopher C.

    1992-01-01

    Our research focuses on the problem of recovering from perturbations in large-scale schedules, specifically on the ability of a human-machine partnership to dynamically modify an airline schedule in response to unanticipated disruptions. This task is characterized by massive interdependencies and a large space of possible actions. Our approach is to apply the following: qualitative, knowledge-intensive techniques relying on a memory of stereotypical failures and appropriate recoveries; and quantitative techniques drawn from the Operations Research community's work on scheduling. Our main scientific challenge is to represent schedules, failures, and repairs so as to make both sets of techniques applicable to the same data. This paper outlines ongoing research in which we are cooperating with United Airlines to develop our understanding of the scientific issues underlying the practicalities of dynamic, real-time schedule repair.

  5. Voltage scheduling for low power/energy

    Science.gov (United States)

    Manzak, Ali

    2001-07-01

    Power considerations have become an increasingly dominant factor in the design of both portable and desk-top systems. An effective way to reduce power consumption is to lower the supply voltage since voltage is quadratically related to power. This dissertation considers the problem of lowering the supply voltage at (i) the system level and at (ii) the behavioral level. At the system level, the voltage of the variable voltage processor is dynamically changed with the work load. Processors with limited sized buffers as well as those with very large buffers are considered. Given the task arrival times, deadline times, execution times, periods and switching activities, task scheduling algorithms that minimize energy or peak power are developed for the processors equipped with very large buffers. A relation between the operating voltages of the tasks for minimum energy/power is determined using the Lagrange multiplier method, and an iterative algorithm that utilizes this relation is developed. Experimental results show that the voltage assignment obtained by the proposed algorithm is very close (0.1% error) to that of the optimal energy assignment and the optimal peak power (1% error) assignment. Next, on-line and off-fine minimum energy task scheduling algorithms are developed for processors with limited sized buffers. These algorithms have polynomial time complexity and present optimal (off-line) and close-to-optimal (on-line) solutions. A procedure to calculate the minimum buffer size given information about the size of the task (maximum, minimum), execution time (best case, worst case) and deadlines is also presented. At the behavioral level, resources operating at multiple voltages are used to minimize power while maintaining the throughput. Such a scheme has the advantage of allowing modules on the critical paths to be assigned to the highest voltage levels (thus meeting the required timing constraints) while allowing modules on non-critical paths to be assigned

  6. Greedy Maximal Scheduling in Wireless Networks

    CERN Document Server

    Li, Qiao

    2010-01-01

    In this paper we consider greedy scheduling algorithms in wireless networks, i.e., the schedules are computed by adding links greedily based on some priority vector. Two special cases are considered: 1) Longest Queue First (LQF) scheduling, where the priorities are computed using queue lengths, and 2) Static Priority (SP) scheduling, where the priorities are pre-assigned. We first propose a closed-form lower bound stability region for LQF scheduling, and discuss the tightness result in some scenarios. We then propose an lower bound stability region for SP scheduling with multiple priority vectors, as well as a heuristic priority assignment algorithm, which is related to the well-known Expectation-Maximization (EM) algorithm. The performance gain of the proposed heuristic algorithm is finally confirmed by simulations.

  7. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    overlap of the design and construction processes. Consequently, the overall scheduling is primarily based on intuition and personal experiences, rather than well founded figures of the specific project. Finally, the overall schedule is comprehensive and complex, and consequently, difficult to overview......The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  8. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  9. Steps Toward Optimal Competitive Scheduling

    Science.gov (United States)

    Frank, Jeremy; Crawford, James; Khatib, Lina; Brafman, Ronen

    2006-01-01

    This paper is concerned with the problem of allocating a unit capacity resource to multiple users within a pre-defined time period. The resource is indivisible, so that at most one user can use it at each time instance. However, different users may use it at different times. The users have independent, se@sh preferences for when and for how long they are allocated this resource. Thus, they value different resource access durations differently, and they value different time slots differently. We seek an optimal allocation schedule for this resource. This problem arises in many institutional settings where, e.g., different departments, agencies, or personal, compete for a single resource. We are particularly motivated by the problem of scheduling NASA's Deep Space Satellite Network (DSN) among different users within NASA. Access to DSN is needed for transmitting data from various space missions to Earth. Each mission has different needs for DSN time, depending on satellite and planetary orbits. Typically, the DSN is over-subscribed, in that not all missions will be allocated as much time as they want. This leads to various inefficiencies - missions spend much time and resource lobbying for their time, often exaggerating their needs. NASA, on the other hand, would like to make optimal use of this resource, ensuring that the good for NASA is maximized. This raises the thorny problem of how to measure the utility to NASA of each allocation. In the typical case, it is difficult for the central agency, NASA in our case, to assess the value of each interval to each user - this is really only known to the users who understand their needs. Thus, our problem is more precisely formulated as follows: find an allocation schedule for the resource that maximizes the sum of users preferences, when the preference values are private information of the users. We bypass this problem by making the assumptions that one can assign money to customers. This assumption is reasonable; a

  10. Improved health-related quality of life of patients with metastatic renal cell carcinoma treated with a 2 weeks on and 1 week off schedule of sunitinib.

    Science.gov (United States)

    Miyake, Hideaki; Harada, Ken-ichi; Miyazaki, Akira; Fujisawa, Masato

    2015-03-01

    The objective of this study was to investigate the significance of changes from the standard dosing schedule of sunitinib, which is 4 weeks of treatment and 2 weeks off (schedule 4/2), to an alternative schedule with 2 weeks of treatment and 1 week off (schedule 2/1), after encountering dose-limiting toxicity in 45 consecutive Japanese patients with metastatic renal cell carcinoma (mRCC). Despite a definitively improved relative dose intensity of sunitinib by changing from schedule 4/2 to 2/1, this difference was not significant. Adverse events (AEs) occurred in all patients on both schedules 4/2 and 2/1; however, the proportion of patients experiencing AEs ≥ grade 3 on schedule 2/1 was significantly lower than that on schedule 4/2. Quality of life (QOL) analysis using SF-36 revealed that all eight scores during schedule 2/1 were more favorable than those during schedule 4/2, and there were significant differences in 2 of the 8 scores between these two schedules. Furthermore, multivariate analyses, which were performed to evaluate the contribution of several AEs on schedule 2/1 to the improvement of each score in SF-36, revealed that fatigue had independent impacts on two scores, despite the lack of an independent association between any scores and the remaining AEs examined. These findings suggest that schedule 2/1 is the optimal dosing schedule of sunitinib against mRCC that balances efficacy and toxicity, since treatment on schedule 2/1 resulted in a markedly improved QOL compared with that on schedule 4/2 by relieving the profile of sunitinib-related AEs.

  11. Two-Dimensional Scheduling: A Review

    Directory of Open Access Journals (Sweden)

    Zhuolei Xiao

    2013-07-01

    Full Text Available In this study, we present a literature review, classification schemes and analysis of methodology for scheduling problems on Batch Processing machine (BP with both processing time and job size constraints which is also regarded as Two-Dimensional (TD scheduling. Special attention is given to scheduling problems with non-identical job sizes and processing times, with details of the basic algorithms and other significant results.

  12. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  13. Overlap Algorithms in Flexible Job-shop Scheduling

    Directory of Open Access Journals (Sweden)

    Celia Gutierrez

    2014-06-01

    Full Text Available The flexible Job-shop Scheduling Problem (fJSP considers the execution of jobs by a set of candidate resources while satisfying time and technological constraints. This work, that follows the hierarchical architecture, is based on an algorithm where each objective (resource allocation, start-time assignment is solved by a genetic algorithm (GA that optimizes a particular fitness function, and enhances the results by the execution of a set of heuristics that evaluate and repair each scheduling constraint on each operation. The aim of this work is to analyze the impact of some algorithmic features of the overlap constraint heuristics, in order to achieve the objectives at a highest degree. To demonstrate the efficiency of this approach, experimentation has been performed and compared with similar cases, tuning the GA parameters correctly.

  14. Idaho National Engineering Laboratory Environmental Restoration Program Schedule Contingency Evaluation Report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This report represents the schedule contingency evaluation done on the FY-93 Major System Acquisition (MSA) Baseline for the Idaho National Engineering Laboratory`s (INEL) Environmental Restoration Program (EPP). A Schedule Contingency Evaluation Team (SCET) was established to evaluate schedule contingency on the MSA Baseline for the INEL ERP associated with completing work within milestones established in the baseline. Baseline schedules had been established considering enforceable deadlines contained in the Federal Facilities Agreement/Consent Order (FFA/CO), the agreement signed in 1992, by the State of Idaho, Department of Health & Welfare, the U.S. Environmental Protection Agency, Region 10, and the U.S. Department of Energy, Idaho Operations Office. The evaluation was based upon the application of standard schedule risk management techniques to the specific problems of the INEL ERP. The schedule contingency evaluation was designed to provided early visibility for potential schedule delays impacting enforceable deadlines. The focus of the analysis was on the duration of time needed to accomplish all required activities to achieve completion of the milestones in the baseline corresponding to the enforceable deadlines. Additionally, the analysis was designed to identify control of high-probability, high-impact schedule risk factors.

  15. GRID SCHEDULING USING ENHANCED ANT COLONY ALGORITHM

    Directory of Open Access Journals (Sweden)

    P. Mathiyalagan

    2010-10-01

    Full Text Available Grid computing is a high performance computing used to solve larger scale computational demands. Task scheduling is a major issue in grid computing systems. Scheduling of tasks is the NP hard problem. The heuristic approach provides optimal solution for NP hard problems .The ant colony algorithm provides optimal solution. The existing ant colony algorithm takes more time to schedule the tasks. In this paper ant colony algorithm improved by enhancing pheromone updating rule such that it schedules the tasks efficiently and better resource utilization. The simulation results prove that proposed method reduces the execution time of tasks compared to existing ant colony algorithm.

  16. Flexible Personnel Scheduling in the Parallel Environment

    Institute of Scientific and Technical Information of China (English)

    XU Ben-zhu; ZHANG Xing-ling

    2014-01-01

    In the view of staff shortages and the huge inventory of products in the current market, we put forward a personnel scheduling model in the target of closing to the delivery date considering the parallelism. Then we designed a scheduling algorithm based on genetic algorithm and proposed a flexible parallel decoding method which take full use of the personal capacity. Case study results indicate that the flexible personnel scheduling considering the order-shop scheduling, machine automatic capabilities and personnel flexible in the target of closing to the delivery date optimize the allocation of human resources, then maximize the efficiency.

  17. Network-Aware HEFT Scheduling for Grid

    Directory of Open Access Journals (Sweden)

    Muhammad Murtaza Yousaf

    2014-01-01

    Full Text Available We present a network-aware HEFT. The original HEFT does not take care of parallel network flows while designing its schedule for a computational environment where computing nodes are physically at distant locations. In the proposed mechanism, such data transfers are stretched to their realistic completion time. A HEFT schedule with stretched data transfers exhibits the realistic makespan of the schedule. It is shown how misleading a schedule can be if the impact of parallel data transfers that share a bottleneck is ignored. A network-aware HEFT can be used to yield a benefit for Grid applications.

  18. Three Algorithms for Flexible Flow-shop Scheduling

    Directory of Open Access Journals (Sweden)

    T. P. Hong

    2007-01-01

    Full Text Available Scheduling is an important process widely used in manufacturing, production, management, computer science, and so on. Appropriate scheduling can reduce material handling costs and time. Finding good schedules for given sets of jobs can thus help factory supervisors effectively control job flows and provide solutions for job sequencing. In simple flow shop problems, each machine operation center includes just one machine. If at least one machine center includes more than one machine, the scheduling problem becomes a flexible flow-shop problem. Flexible flow shops are thus generalization of simple flow shops. In this paper, we propose three algorithms to solve flexible flow-shop problems of more than two machine centers. The first one extends Sriskandarajah and Sethi’s method by combining both the LPT and the search-and-prune approaches to get a nearly optimal makespan. It is suitable for a medium-sized number of jobs. The second one is an optimal algorithm, entirely using the search-and-prune technique. It can work only when the job number is small. The third one is similar to the first one, except that it uses Petrov’s approach (PT to deal with job sequencing instead of search-and-prune. It can get a polynomial time complexity, thus being more suitable for real applications than the other two. Experiments are also made to compare the three proposed algorithms. A trade-off can thus be achieved between accuracy and time complexity.

  19. An Estimation of Distribution Algorithm for Nurse Scheduling

    CERN Document Server

    Aickelin, Uwe

    2008-01-01

    Schedules can be built in a similar way to a human scheduler by using a set of rules that involve domain knowledge. This paper presents an Estimation of Distribution Algorithm (eda) for the nurse scheduling problem, which involves choosing a suitable scheduling rule from a set for the assignment of each nurse. Unlike previous work that used Genetic Algorithms (ga) to implement implicit learning, the learning in the proposed algorithm is explicit, i.e. we identify and mix building blocks directly. The eda is applied to implement such explicit learning by building a Bayesian network of the joint distribution of solutions. The conditional probability of each variable in the network is computed according to an initial set of promising solutions. Subsequently, each new instance for each variable is generated by using the corresponding conditional probabilities, until all variables have been generated, i.e. in our case, a new rule string has been obtained. Another set of rule strings will be generated in this way, ...

  20. Mathematical programming approach to multidimensional mechanism design for single machine scheduling

    NARCIS (Netherlands)

    Duives, Jelle; Uetz, Marc

    2011-01-01

    We consider an optimal mechanism design problem for single machine scheduling that has been proposed by Heydenreich et al. in 2008. There, an example was presented to show that the 2-dimensional mechanism design problem does not satisfy a condition called IIA - independence of irrelevant alternative

  1. Scheduling and location issues in transforming service fleet vehicles to electric vehicles

    DEFF Research Database (Denmark)

    Mirchandani, Pitu; Madsen, Oli B.G.; Adler, Jonathan

    . In particular, the paper addresses the optimization and analysis of infrastructure design alternatives dealing with (1) the number of battery-exchange stations, (2) their locations, (3) the recharging capacity and inventory management of batteries at each facility, and (4) routing and scheduling of the fleet...

  2. Functional Communication Training without Extinction Using Concurrent Schedules of Differing Magnitudes of Reinforcement in Classrooms

    Science.gov (United States)

    Davis, Dawn H.; Fredrick, Laura D.; Alberto, Paul A.; Gama, Roberto

    2012-01-01

    This study investigated the effects of functional communication training (FCT) implemented with concurrent schedules of differing magnitudes of reinforcement in lieu of extinction to reduce inappropriate behaviors and increase alternative mands. Participants were four adolescent students diagnosed with severe emotional and behavior disorders…

  3. Prediction Based Proactive Thermal Virtual Machine Scheduling in Green Clouds

    OpenAIRE

    Supriya Kinger; Rajesh Kumar; Anju Sharma

    2014-01-01

    Cloud computing has rapidly emerged as a widely accepted computing paradigm, but the research on Cloud computing is still at an early stage. Cloud computing provides many advanced features but it still has some shortcomings such as relatively high operating cost and environmental hazards like increasing carbon footprints. These hazards can be reduced up to some extent by efficient scheduling of Cloud resources. Working temperature on which a machine is currently running can be taken as a crit...

  4. Web-Based Requesting and Scheduling Use of Facilities

    Science.gov (United States)

    Yeager, Carolyn M.

    2010-01-01

    Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.

  5. Mothers' Night Work and Children's Behavior Problems

    Science.gov (United States)

    Dunifon, Rachel; Kalil, Ariel; Crosby, Danielle A.; Su, Jessica Houston

    2013-01-01

    Many mothers work in jobs with nonstandard schedules (i.e., schedules that involve work outside of the traditional 9-5, Monday through Friday schedule); this is particularly true for economically disadvantaged mothers. In the present article, we used longitudinal data from the Fragile Families and Child Wellbeing Survey (n = 2,367 mothers of…

  6. Performance under Competitive and Self-Competitive Fixed-Interval Schedules of Reinforcement

    Science.gov (United States)

    Saville, Bryan K.

    2009-01-01

    Participants completed blocks of trials under simple (i.e., work-alone), competitive, and self-competitive fixed-interval 20-s schedules of reinforcement. In general, response rates were highest during competition and lowest while working alone. In addition, whereas participants emitted responses at a constant rate while working alone, competitive…

  7. Looking for an Alternative.

    Science.gov (United States)

    Kennedy, Jack

    1999-01-01

    Argues that high school newspapers might do well to create stronger ties with alternative weeklies. Discusses issues of niche marketing, alternative content, and alternative presentation. Notes that high school papers could learn a lot from alternative newspapers. (SR)

  8. Emergency response nurse scheduling with medical support robot by multi-agent and fuzzy technique.

    Science.gov (United States)

    Kono, Shinya; Kitamura, Akira

    2015-08-01

    In this paper, a new co-operative re-scheduling method corresponding the medical support tasks that the time of occurrence can not be predicted is described, assuming robot can co-operate medical activities with the nurse. Here, Multi-Agent-System (MAS) is used for the co-operative re-scheduling, in which Fuzzy-Contract-Net (FCN) is applied to the robots task assignment for the emergency tasks. As the simulation results, it is confirmed that the re-scheduling results by the proposed method can keep the patients satisfaction and decrease the work load of the nurse.

  9. Conditioned reinforcement dynamics in three-link chained schedules.

    Science.gov (United States)

    Williams, B A

    1997-01-01

    In two experiments rats were trained on three-link concurrent-chains schedules of reinforcement. In Experiment 1, additional entries to one terminal link were added during one of the middle links to a baseline schedule that was otherwise equal for the two chains, and, depending on the condition, these additional terminal-link presentations ended either in food or in no food. When food occurred, preference was always in favor of the chain with the additional terminal-link presentations (which also entailed a higher rate of reinforcement). When no food occurred at the end of the additional terminal links, the outcome depended on the nature of the stimuli associated with these additional terminal links. When stimuli different from the reinforced baseline terminal links were used for the no-food terminal links, preference was against the choice alternative that led to the extra periods of extinction. When the same stimulus was used for the two kinds of terminal links, preference was near indifference, that is, significantly greater than when different stimuli were used. In Experiment 2, rats learned repeated reversals of a simultaneous discrimination under a three-link concurrent-chains schedule, in which the food or no-food choice outcomes were delayed until the end of the chain. Different conditions were defined by the point in the chain at which differential stimuli occurred. When the middle and terminal links provided no differential stimuli, discrimination was acquired more slowly than when differential stimuli occurred in both links. When differential stimuli occurred in the middle but not the terminal links, acquisition rates were intermediate. Both experiments together show that the effects of stimuli in a chain schedule are due partly to the time to food correlated with the stimuli and partly to the time to the next conditioned reinforcer in the sequence.

  10. Optimal Restoration Scheduling of Damaged Networks Under Uncertain Environment by Using Improved Genetic Algorithm

    Institute of Scientific and Technical Information of China (English)

    Hitoshi FURUTA; Ken ISHIBASHI; Koichiro NAKATSU; Shun HOTTA

    2008-01-01

    The purpose of this research is to propose an early restoration for lifeline systems after earthquake disasters. The previous researches show that the optimization of the restoration schedule by using genetic algorithm (GA) is powerful. However, those are not considering the uncertain environment after earthquake disasters. The circumstances of the damage at devastated areas are very changeable due to the aftershock,fire disaster and bad weather. In addition, the restoring works may delay by unexpected accidents. Therefore,it is necessary to obtain the restoration schedule which has robustness, because the actual restoring works could not progress smoothly under the uncertain environment. GA considering uncertainty (GACU) can treat various uncertainties involved, but it is difficult to obtain the robust schedule. In this study, an attempt is made to develop a decision support system of the optimal restoration scheduling by using the improved GACU.

  11. The role of the production scheduling system in rescheduling

    Science.gov (United States)

    Kalinowski, K.; Grabowik, C.; Kempa, W.; Paprocka, I.

    2015-11-01

    The paper presents the rescheduling problem in the context of cooperation between production scheduling system (PSS) and other units in an integrated manufacturing environment - decision makers and software systems. The main aim is to discuss the PSS functionality for maximizing automation of the rescheduling process, reducing the response time and improving the quality of generated solutions. PSSs operate in the meeting of tactical and operational level of planning and control, and play an important role in the production preparation and control. On the basis of information about orders, technology and production system state (e.g. resources availability) they prepare and/or update a detailed plan of production flow - a schedule. All necessary data for scheduling and rescheduling are usually collected in other systems both from organizational and technical production preparation, e.g. ERP, PLM, MES, CAPP or others, as well as they are entered directly by the decision- makers/operators. Data acquired in this way are often incomplete and inconsistent. Therefore the existing rescheduling software works according to interactive method - rather support but does not replace the human decision maker in tasks planning. When rescheduling, due to the limited amount of time to make a decision this interaction is particularly important. An additional problem arises in data acquisition, in the process of data exchanging between systems or in the identification of new data sources and their processing. Different approaches to rescheduling were characterized, including those solutions, where all these operations are carried out by an autonomous system and those in which scheduling is performed only upon request from the outside, for the newly created scheduling data representing the current state of the production system.

  12. 10 CFR 51.15 - Time schedules.

    Science.gov (United States)

    2010-01-01

    ... REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) § 51.15 Time... 10 Energy 2 2010-01-01 2010-01-01 false Time schedules. 51.15 Section 51.15 Energy NUCLEAR... NEPA review in accordance with any time schedule established under this section. (b) As specified in...

  13. Dishabituation Produces Interactions during Multiple Schedules

    Science.gov (United States)

    McSweeney, Frances K.; Kowal, Benjamin P.; Murphy, Eric S.; Isava, Duane M.

    2004-01-01

    McSweeney and Weatherly (1998) argued that differential habituation to the reinforcer contributes to the behavioral interactions observed during multiple schedules. The present experiment confirmed that introducing dishabituators into one component of a multiple schedule increases response rate in the other, constant, component. During baseline,…

  14. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru;

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource...

  15. NEW NONSTANDARD JOB SHOP SCHEDULING ALGORITHM

    Institute of Scientific and Technical Information of China (English)

    XIE Zhiqiang; YE Guangjie; ZHANG Dali; TAN Guangyu

    2008-01-01

    Considering the complex constraint between operations in nonstandard job shop scheduling problem (NJSSP), critical path of job manufacturing tree is determined according to priority scheduling function constructed. Operations are divided into dependent operations and independent operations with the idea of subsection, and corresponding scheduling strategy is put forward according to operation characteristic in the segment and the complementarities of identical function machines. Forward greedy rule is adopted mainly for dependent operations to make operations arranged in the right position of machine selected, then each operation can be processed as early as possible, and the total processing time of job can be shortened as much as possible. For independent operations optimum scheduling rule is adopted mainly, the inserting position of operations will be determined according to the gap that the processing time of operations is subtracted from idle time of machine, and the operation will be inserted in the position with minimal gap. Experiments show, under the same conditions, the result that operations are scheduled according to the object function constructed, and the scheduling strategy adopted is better than the result that operations are scheduled according to efficiency scheduling algorithm.

  16. Unrelated Machine Scheduling with Stochastic Processing Times

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc

    2016-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous processors and a certain degree of uncertainty about the processing times of jobs. In this paper we address both, and study for the first time a scheduling problem that combines the classical unrelated

  17. Downlink Scheduling in Long Term Evolution

    Directory of Open Access Journals (Sweden)

    Anwar Hossain

    2015-06-01

    Full Text Available This is an investigated research article on resource block scheduling of Long Term Evolution (LTE. LTE is one of the evolutions of the Universal Mobile Telecommunication System (UMTS. It provides internet access to mobile users through smart phone, laptop and other android devices. LTE offers a high speed data and multimedia services. It supports data rates up to 100 Mbps in the downlink and 50 Mbps in the uplink transmission. Our research investigation was aim to the downlink scheduling. We have considered The Best CQI scheduling algorithm and the Round Robin scheduling algorithm. The implementation, analysis and comparison of these scheduling algorithms have been performed through MATLAB simulator. We have analyzed the impact of the scheduling schemes on the throughput and the fairness of both scheduling schemes. Here we have proposed a new scheduling algorithm that achieves a compromise between the throughput and the fairness. Orthogonal Frequency Division Multiplexing (OFDM has been adopted as the downlink transmission scheme. We have considered the impact of the channel delay on the throughput. In addition, MIMO transceiver systems have been implemented to increase the throughput

  18. Scheduling in high performance buffered crossbar switches

    NARCIS (Netherlands)

    Mhamdi, L.

    2007-01-01

    High performance routers are the basic building blocks of the Internet. Most high performance routers built today use crossbars and a centralized scheduler. Due to their high scheduling complexity, crossbar-based routers are not scalable and cannot keep pace with the explosive growth of the Internet

  19. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling approa

  20. 37 CFR 2.85 - Classification schedules.

    Science.gov (United States)

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Classification schedules. 2..., DEPARTMENT OF COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Classification § 2.85 Classification schedules. (a) International classification system. Section 6.1 of this chapter sets forth the...

  1. Scheduling parameters in flexible manufacturing cells

    NARCIS (Netherlands)

    Slomp, J.; Gaalman, G.J.C.; Ahmad, M.M.; Sullivan, W.G.; Migliore, H.; Randhawa, S.

    1998-01-01

    The existence of a well-designed scheduling procedure is a major condition for an effective integration of a flexible manufacturing cell (FMC) in the material flow of a firm. This paper shows the presence and relative importance of three parameter types in the scheduling of operations on a flexible

  2. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  3. 5 CFR 293.511 - Retention schedule.

    Science.gov (United States)

    2010-01-01

    ... RECORDS Employee Medical File System Records § 293.511 Retention schedule. (a) Temporary EMFS records must... accordance with General Records Schedule (GRS) 1, item 21, issued by the National Archives and Records Administration (NARA). (b) Occupational Medical Records considered to be long-term records must be maintained...

  4. On green routing and scheduling problem

    CERN Document Server

    Touati, Nora

    2012-01-01

    The vehicle routing and scheduling problem has been studied with much interest within the last four decades. In this paper, some of the existing literature dealing with routing and scheduling problems with environmental issues is reviewed, and a description is provided of the problems that have been investigated and how they are treated using combinatorial optimization tools.

  5. On green routing and scheduling problem

    OpenAIRE

    Touati, Nora; Jost, Vincent

    2011-01-01

    The vehicle routing and scheduling problem has been studied with much interest within the last four decades. In this paper, some of the existing literature dealing with routing and scheduling problems with environmental issues is reviewed, and a description is provided of the problems that have been investigated and how they are treated using combinatorial optimization tools.

  6. Shaping Academic Task Engagement with Percentile Schedules

    Science.gov (United States)

    Athens, Elizabeth S.; Vollmer, Timothy R.; St. Peter Pipkin, Claire C.

    2007-01-01

    The purpose of this study was to examine the use of percentile schedules as a method of quantifying the shaping procedure in an educational setting. We compared duration of task engagement during baseline measurements for 4 students to duration of task engagement during a percentile schedule. As a secondary purpose, we examined the influence on…

  7. Performance analysis of active schedules in identical parallel machine

    Institute of Scientific and Technical Information of China (English)

    Changjun WANG; Yugeng XI

    2007-01-01

    Active schedule is one of the most basic and popular concepts in production scheduling research. For identical parallel machine scheduling with jobs' dynamic arrivals, the tight performance bounds of active schedules under the measurement of four popular objectives are respectively given in this paper. Similar analysis method and conclusions can be generalized to static identical parallel machine and single machine scheduling problem.

  8. Overcoming barriers to scheduling embedded generation to support distribution networks

    Energy Technology Data Exchange (ETDEWEB)

    Wright, A.J.; Formby, J.R.

    2000-07-01

    Current scheduling of embedded generation for distribution in the UK is limited and patchy. Some DNOs actively schedule while others do none. The literature on the subject is mainly about accommodating volatile wind output, and optimising island systems, for both cost of supply and network stability. The forthcoming NETA will lower prices, expose unpredictable generation to imbalance markets and could introduce punitive constraint payments on DNOs, but at the same time create a dynamic market for both power and ancillary services from embedded generators. Most renewable generators either run as base load (e.g. waste ) or according to the vagaries of the weather (e.g. wind, hydro), so offer little scope for scheduling other than 'off'. CHP plant is normally heat- led for industrial processes or building needs, but supplementary firing or thermal storage often allow considerable scope for scheduling. Micro-CHP with thermal storage could provide short-term scheduling, but tends to be running anyway during the evening peak. Standby generation appears to be ideal for scheduling, but in practice operators may be unwilling to run parallel with the network, and noise and pollution problems may preclude frequent operation. Statistical analysis can be applied to calculate the reliability of several generators compared to one; with a large number of generators such as micro-CHP reliability of a proportion of load is close to unity. The type of communication for generation used will depend on requirements for bandwidth, cost, reliability and whether it is bundled with other services. With high levels of deeply embedded, small-scale generation using induction machines, voltage control and black start capability will become important concerns on 11 kV and LV networks. This will require increased generation monitoring and remote control of switchgear. Examples of cost benefits from scheduling are given, including deferred reinforcement, increased exports on non

  9. Scheduler Vulnerabilities and Attacks in Cloud Computing

    CERN Document Server

    Zhou, Fangfei; Desnoyers, Peter; Sundaram, Ravi

    2011-01-01

    In hardware virtualization a hypervisor provides multiple Virtual Machines (VMs) on a single physical system, each executing a separate operating system instance. The hypervisor schedules execution of these VMs much as the scheduler in an operating system does, balancing factors such as fairness and I/O performance. As in an operating system, the scheduler may be vulnerable to malicious behavior on the part of users seeking to deny service to others or maximize their own resource usage. Recently, publically available cloud computing services such as Amazon EC2 have used virtualization to provide customers with virtual machines running on the provider's hardware, typically charging by wall clock time rather than resources consumed. Under this business model, manipulation of the scheduler may allow theft of service at the expense of other customers, rather than merely reallocating resources within the same administrative domain. We describe a flaw in the Xen scheduler allowing virtual machines to consume almost...

  10. Approximation algorithm for multiprocessor parallel job scheduling

    Institute of Scientific and Technical Information of China (English)

    陈松乔; 黄金贵; 陈建二

    2002-01-01

    Pk|fix|Cmax problem is a new scheduling problem based on the multiprocessor parallel job, and it is proved to be NP-hard problem when k≥3. This paper focuses on the case of k=3. Some new observations and new techniques for P3|fix|Cmax problem are offered. The concept of semi-normal schedulings is introduced, and a very simple linear time algorithm Semi-normal Algorithm for constructing semi-normal schedulings is developed. With the method of the classical Graham List Scheduling, a thorough analysis of the optimal scheduling on a special instance is provided, which shows that the algorithm is an approximation algorithm of ratio of 9/8 for any instance of P3|fix|Cmax problem, and improves the previous best ratio of 7/6 by M.X.Goemans.

  11. Human choice under schedules of negative reinforcement.

    Science.gov (United States)

    Alessandri, Jérôme; Cançado, Carlos R X

    2015-12-01

    The generalized matching equation provides a good description of response allocation in concurrent schedules of positive reinforcement in nonhumans as well as in humans. The present experiment was conducted to further investigate the allocation of responding under concurrent schedules of negative reinforcement (i.e., timeouts from pressing a force cell) in humans. Each of three participants was exposed to different reinforcement ratios (9:1, 1:1 and 1:9) in the terminal links of a concurrent-chains schedule of negative reinforcement. The allocation of responding under this schedule was well described by the generalized matching equation, for each participant. These results replicate previous findings obtained with nonhumans and humans under concurrent schedules of positive reinforcement. In addition, they extend the results reported by Alessandri and Rivière (2013) showing that human behavior maintained by timeouts from an effortful response is sensitive to changes in relative reinforcement ratios as well as relative delays of reinforcement.

  12. Dynamic Scheduling of Flexible Job Shops

    Institute of Scientific and Technical Information of China (English)

    SHAHID Ikramullah Butt; SUN Hou-fang

    2007-01-01

    Aim of this research is to minimize makespan in the flexible job shop environment by the use of genetic algorithms and scheduling rules.Software is developed using genetic algorithms and scheduling rules based on certain constraints such as non-preemption of jobs,recirculation,set up times,non-breakdown of machines etc.Purpose of the software is to develop a schedule for flexible job shop environment,which is a special case of job shop scheduling problem.Scheduling algorithm used in the software is verified and tested by using MT10 as benchmark problem,presented in the flexible job shop environment at the end.LEKIN(R) software results are also compared with results of the developed software by the use of MT10 benchmark problem to show that the latter is a practical software and can be used successfully at BIT Training Workshop.

  13. Practical Experiences With Torque Meta-Scheduling In The Czech National Grid

    Directory of Open Access Journals (Sweden)

    Simon Toth

    2012-01-01

    Full Text Available The Czech National Grid Infrastructure went through a complex transition inthe last year. The production environment has been switched from a commercialbatch system PBSPro, which was replaced by an open source alternative Torquebatch system.This paper concentrates on two aspects of this transition. First, we will presentour practical experience with Torque being used as a production ready batchsystem. Our modified version of Torque, with all the necessary PBSPro ex-clusive features re-implemented and further extended with new features likecloud-like behaviour, was deployed across the entire production environment,covering the entire Czech Republic for almost a full year.In the second part, we will present our work on meta-scheduling. This in-volves our work on distributed architecture and cloud-grid convergence. Thedistributed architecture was designed to overcome the limitations of a centralserver setup, which was originally used and presented stability and performanceissues. While this paper does not discuss the inclusion of cloud interfaces intogrids, it does present the dynamic infrastructure, which is a requirement forsharing the grid infrastructure between a batch system and a cloud gateway.We are also inviting everyone to try out our fork of the Torque batch system,which is now publicly available.

  14. Development of Milestone Schedules for Selected Logistics Support Directorate Programs. Appendix A. Part 2. Task Summaries.

    Science.gov (United States)

    1987-09-15

    0/ TIPO SCHEDULE: DV CONDUCT A PERFORMANCE DEMONSTRATION PRIOR TO TECHNICAL TEST CODE NUMBER: NONE (TT) I AND USER TEST (UT) I. RESPONSIBILITY...NONDEVELOPMENT ITEM EVALUATION PLAN CODE NUMBER: NONE (NEP) FOR MARKET SURVEY. RESPONSIBILITY: PA & T DURATION: 44.00 WORK DAYS .2 CFP COMP SCHEDULE: NDII THE...NONE BASED UPON THE MARKET SURVEY. THESE FINDINGS SERVE AS THE RESPONSIBILITY: ROY & ILS BASIS FOR THE IN-PROCESS REVIEW (IPR) DECISION TO PURSUE

  15. Reliability Level of in the Production Schedule Design in the Construction Company

    OpenAIRE

    Velina Yordanova

    2013-01-01

    A reliable production schedule is an important prerequisite for the achievement of good economic results on the part of the construction enterprise and for ensuring rhythmical and effective work in its functioning. In this respect in the present article there are considered the peculiarities of the production schedule, which we believe it is necessary to consider during its development. Taking into consideration the characteristics of construction production there is made an attempt at propos...

  16. Smart self-scheduling of Gencos with thermal and energy storage units under price uncertainty

    OpenAIRE

    Soroudi, Alireza

    2013-01-01

    This paper provides a self-scheduling tool for price taker Gencos. This methodology is based on Robust Optimization (RO) to deal with the uncertainties of market price values in the day-ahead electricity pool market. The Genco is assumed to be the entity who decides about the operating schedules of its thermal units and Compressed Air Energy Storage units. The benefits of Genco brought by smart grid technology and energy storage systems are investigated in this work. The applicability of the ...

  17. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  18. Hybrid scheduling mechanisms for Next-generation Passive Optical Networks based on network coding

    Science.gov (United States)

    Zhao, Jijun; Bai, Wei; Liu, Xin; Feng, Nan; Maier, Martin

    2014-10-01

    Network coding (NC) integrated into Passive Optical Networks (PONs) is regarded as a promising solution to achieve higher throughput and energy efficiency. To efficiently support multimedia traffic under this new transmission mode, novel NC-based hybrid scheduling mechanisms for Next-generation PONs (NG-PONs) including energy management, time slot management, resource allocation, and Quality-of-Service (QoS) scheduling are proposed in this paper. First, we design an energy-saving scheme that is based on Bidirectional Centric Scheduling (BCS) to reduce the energy consumption of both the Optical Line Terminal (OLT) and Optical Network Units (ONUs). Next, we propose an intra-ONU scheduling and an inter-ONU scheduling scheme, which takes NC into account to support service differentiation and QoS assurance. The presented simulation results show that BCS achieves higher energy efficiency under low traffic loads, clearly outperforming the alternative NC-based Upstream Centric Scheduling (UCS) scheme. Furthermore, BCS is shown to provide better QoS assurance.

  19. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  20. Implementation Learning and Forgetting Curve to Scheduling in Garment Industry

    Science.gov (United States)

    Muhamad Badri, Huda; Deros, Baba Md; Syahri, M.; Saleh, Chairul; Fitria, Aninda

    2016-02-01

    The learning curve shows the relationship between time and the cumulative number of units produced which using the mathematical description on the performance of workers in performing repetitive works. The problems of this study is level differences in the labors performance before and after the break which affects the company's production scheduling. The study was conducted in the garment industry, which the aims is to predict the company production scheduling using the learning curve and forgetting curve. By implementing the learning curve and forgetting curve, this paper contributes in improving the labors performance that is in line with the increase in maximum output 3 hours productive before the break are 15 unit product with learning curve percentage in the company is 93.24%. Meanwhile, the forgetting curve improving maximum output 3 hours productive after the break are 11 unit product with the percentage of forgetting curve in the company is 92.96%. Then, the obtained 26 units product on the productive hours one working day is used as the basic for production scheduling.

  1. Pheromone based alternative route planning

    Directory of Open Access Journals (Sweden)

    Liangbing Feng

    2016-08-01

    Full Text Available In this work, we propose an improved alternative route calculation based on alternative figures, which is suitable for practical environments. The improvement is based on the fact that the main traffic route is the road network skeleton in a city. Our approach using nodes may generate a higher possibility of overlapping. We employ a bidirectional Dijkstra algorithm to search the route. To measure the quality of an Alternative Figures (AG, three quotas are proposed. The experiment results indicate that the improved algorithm proposed in this paper is more effective than others.

  2. Renovation work at Restaurant 1

    CERN Multimedia

    2006-01-01

    Due to the age of the present kitchen and freeflow installations in Restaurant 1, essential renovation work is due to be carried out. The work is scheduled to last from September 2006 to May 2007. Work on the self-service area of the restaurant will commence in November. Every effort will be made to minimise the inconvenience caused to users of the restaurant and we thank you in advance for your co-operation during this period.

  3. Visitor schedule management system- an intelligent decision support system

    CERN Document Server

    Nidhra, Srinivas; Ethiraj, Vinay Sudha

    2012-01-01

    Travelling salesman problem is a problem which is of high interest for researchers, industry professionals, and academicians. Visitor or salesman used to face lot of problems with respect to scheduling based on meeting top ranked clients. Even excel sheet made the work tedious. So these flaws propelled us to design an intelligent decision support system. This paper reports the problem definition we tried to address and possible solution to this problem. We even explained the project design and implementation of our visitor schedule management system.. Our system made a major contribution in terms of valuable resources such as time and satisfying high ranked clients efficiently. We used optimization via mathematical programming to solve these issues.

  4. Acceleration schedules for a recirculating heavy-ion accelerator

    Energy Technology Data Exchange (ETDEWEB)

    Sharp, W.M.; Grote, D.P.

    2002-05-01

    Recent advances in solid-state switches have made it feasible to design programmable, high-repetition-rate pulsers for induction accelerators. These switches could lower the cost of recirculating induction accelerators, such as the ''small recirculator'' at Lawrence Livermore National Laboratory (LLNL), by substantially reducing the number of induction modules. Numerical work is reported here to determine what effects the use of fewer pulsers at higher voltage would have on the beam quality of the LLNL small recirculator. Lattices with different numbers of pulsers are examined using the fluid/envelope code CIRCE, and several schedules for acceleration and compression are compared for each configuration. For selected schedules, the phase-space dynamics is also studied using the particle-in-cell code WARP3d.

  5. Opportunistic Scheduling in Heterogeneous Networks: Distributed Algorithms and System Capacity

    CERN Document Server

    Kampeas, Dor-Joseph; Gurewitz, Omer

    2012-01-01

    In this work, we design and analyze novel distributed scheduling algorithms for multi-user MIMO systems. In particular, we consider algorithms which do not require sending channel state information to a central processing unit, nor do they require communication between the users themselves, yet, we prove their performance closely approximates that of a centrally-controlled system, which is able to schedule the strongest user in each time-slot. Possible application include, but are not limited to, modern 4G networks such as 3GPP LTE, or random access protocols. The analysis is based on a novel application of the Point-Process approximation, enabling the examination of non-homogeneous cases, such as non-identically distributed users, or handling various QoS considerations, which to date had been open.

  6. Schedule Optimization Study, Hanford RI/FS Program

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    A Schedule Optimization Study (SOS) of the US Department of Energy (DOE) Hanford Site Remedial Investigation/Feasibility Study (RI/FS) Program was conducted by an independent team of professionals from other federal agencies and the private sector experienced in environmental restoration. This team spent two weeks at Hanford in September 1992 examining the reasons for the lengthy RI/FS process at Hanford and developing recommendations to expedite the process. The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit RI/FS Work Plan. This report documents the study called for in the August 29, 1991, Dispute Resolution Committee Decision Statement. Battelle's Environmental Management Operations (EMO) coordinated the effort for DOE's Richland Field Office (RL).

  7. Automated problem scheduling and reduction of synchronization delay effects

    Science.gov (United States)

    Saltz, Joel H.

    1987-01-01

    It is anticipated that in order to make effective use of many future high performance architectures, programs will have to exhibit at least a medium grained parallelism. A framework is presented for partitioning very sparse triangular systems of linear equations that is designed to produce favorable preformance results in a wide variety of parallel architectures. Efficient methods for solving these systems are of interest because: (1) they provide a useful model problem for use in exploring heuristics for the aggregation, mapping and scheduling of relatively fine grained computations whose data dependencies are specified by directed acrylic graphs, and (2) because such efficient methods can find direct application in the development of parallel algorithms for scientific computation. Simple expressions are derived that describe how to schedule computational work with varying degrees of granularity. The Encore Multimax was used as a hardware simulator to investigate the performance effects of using the partitioning techniques presented in shared memory architectures with varying relative synchronization costs.

  8. Optimisation of Resource Scheduling in VCIM Systems Using Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    Son Duy Dao

    2012-11-01

    Full Text Available The concept of Virtual Computer-Integrated Manufacturing (VCIM has been proposed for one and a half decade with purpose of overcoming the limitation of traditional Computer-Integrated Manufacturing (CIM as it only works within an enterprise. VCIM system is a promising solution for enterprises to survive in the globally competitive market because it can exploit effectively locally as well as globally distributed resources. In this paper, a Genetic Algorithm (GA based approach for optimising resource scheduling in the VCIM system is proposed. Firstly, based on the latest concept of VCIM system, a class of resource scheduling problems in the system is modelled by using agent-based approach. Secondly, GA with new strategies of handling constraint, chromosome encoding, crossover and mutation is developed to search for optimal solution for the problem. Finally, a case study is given to demonstrate the robustness of the proposed approach.

  9. Towards host-to-host meeting scheduling negotiation

    Directory of Open Access Journals (Sweden)

    Rani Megasari

    2015-03-01

    Full Text Available This paper presents a different scheme of meeting scheduling negotiation among a large number of personnel in a heterogeneous community. This scheme, named Host-to-Host Negotiation, attempts to produce a stable schedule under uncertain personnel preferences. By collecting information from hosts’ inter organizational meeting, this study intends to guarantee personnel availability. As a consequence, personnel’s and meeting’s profile in this scheme are stored in a centralized manner. This study considers personnel preferences by adapting the Clarke Tax Mechanism, which is categorized as a non manipulated mechanism design. Finally, this paper introduces negotiation strategies based on the conflict handling mode. A host-to-host scheme can give notification if any conflict exist and lead to negotiation process with acceptable disclosed information. Nevertheless, a complete negotiation process will be more elaborated in the future works.

  10. Evolutionary based system for production scheduling in foundry

    Directory of Open Access Journals (Sweden)

    A. Stawowy

    2008-10-01

    Full Text Available This work presents a development of a capable-to-promise system for companies that operate under the hybrid make-to-order and maketo-stock strategy in a lot-sizing and flowshop environment. Proposed system simultaneously considers planning and scheduling processesin order to achieve the optimality. Optimisation engine is based on an advanced evolutionary algorithm. Information available in ERPsystem from different production units and stages, the optimization module, and customer requests are integrated via Internet using XMLlanguage as a data exchange standard.The details on key elements of the system and a software architecture are given. Practical application of the system is illustrated on the example of production scheduling for an iron castings foundry.

  11. A Bayesian Optimisation Algorithm for the Nurse Scheduling Problem

    CERN Document Server

    Jingpeng, Li

    2008-01-01

    A Bayesian optimization algorithm for the nurse scheduling problem is presented, which involves choosing a suitable scheduling rule from a set for each nurses assignment. Unlike our previous work that used Gas to implement implicit learning, the learning in the proposed algorithm is explicit, ie. Eventually, we will be able to identify and mix building blocks directly. The Bayesian optimization algorithm is applied to implement such explicit learning by building a Bayesian network of the joint distribution of solutions. The conditional probability of each variable in the network is computed according to an initial set of promising solutions. Subsequently, each new instance for each variable is generated, ie in our case, a new rule string has been obtained. Another set of rule strings will be generated in this way, some of which will replace previous strings based on fitness selection. If stopping conditions are not met, the conditional probabilities for all nodes in the Bayesian network are updated again usin...

  12. Minimizing Tardy Jobs in a Single Machine Scheduling Problem with Fuzzy Processing Times and Due Dates

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    The optimality of a fuzzy logic alternative to the usual treatment of uncertainties in a scheduling system using fuzzy numbers is examined formally. Processing times and due dates are fuzzified and presented by fuzzy numbers. With introducing the necessity measure, we compare fuzzy completion times of jobs with fuzzy due dates to decide whether jobs are tardy. The object is to minimize the numbers of tardy jobs.The efficient solution method for this problem is proposed. And deterministic counterpart of this single machine scheduling problem is a special case of fuzzy version.

  13. Proposing New Heuristic Approaches for Preventive Maintenance Scheduling

    Directory of Open Access Journals (Sweden)

    majid Esmailian

    2013-08-01

    Full Text Available The purpose of preventive maintenance management is to perform a series of tasks that prevent or minimize production breakdowns and improve reliability of production facilities. An important objective of preventive maintenance management is to minimize downtime of production facilities. In order to accomplish this objective, personnel should efficiently allocate resources and determine an effective maintenance schedule. Gopalakrishnan (1997 developed a mathematical model and four heuristic approaches to solve the preventive maintenance scheduling problem of assigning skilled personnel to work with tasks that require a set of corresponding skills. However, there are several limitations in the prior work in this area of research. The craft combination problem has not been solved because the craft combination is assumed as given. The craft combination problem concerns the computation of all combinations of assigning multi skilled workers to accomplishment of a particular task. In fact, determining craft combinations is difficult because of the exponential number of craft combinations that are possible. This research provides a heuristic approach for determining the craft combination and four new heuristic approach solution for the preventive maintenance scheduling problem with multi skilled workforce constraints. In order to examine the new heuristic approach and to compare the new heuristic approach with heuristic approach of Gopalakrishnan (1997, 81 standard problems have been generated based on the criterion suggested by from Gopalakrishnan (1997. The average solution quality (SQ of the new heuristic approaches is 1.86% and in old heuristic approaches is 8.32%. The solution time of new heuristic approaches are shorter than old heuristic approaches. The solution time of new heuristic approaches is 0.78 second and old heuristic approaches is 6.43 second, but the solution time of mathematical model provided by Gopalakrishnan (1997 is 152 second.

  14. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Since the lowering of YB0 in February, less spectacular but nonetheless crucial progress has been made along the critical path to CMS completion. The YB0 has been aligned with the beamline to a fraction of a mm, and the HCAL has been fully installed. Cabling scaffolding for YB0 services has been built and one half (-z end) of the ECAL barrel has been installed. The YB0 services installation has begun, with two of the major technical challenges delaying bulk installation, namely PP1 detailed design, manufacture and installation plus Tracker cooling pipe insulation, now apparently solved. Significant difficulties in detailed design, integration and procurement of cable ducts remain. Despite this, the design of the +end is close to complete, and Tracker power cable installation on two sectors of the +end is well advanced. A new master schedule, v36.0, is being prepared to account for the updated actual situation at point 5 and for the revised LHC machine planning. Safety The enormous amount of...

  15. Downlink Scheduling for Multiclass Traffic in LTE

    Directory of Open Access Journals (Sweden)

    Madan Ritesh

    2009-01-01

    Full Text Available We present a design of a complete and practical scheduler for the 3GPP Long Term Evolution (LTE downlink by integrating recent results on resource allocation, fast computational algorithms, and scheduling. Our scheduler has low computational complexity. We define the computational architecture and describe the exact computations that need to be done at each time step (1 milliseconds. Our computational framework is very general, and can be used to implement a wide variety of scheduling rules. For LTE, we provide quantitative performance results for our scheduler for full buffer, streaming video (with loose delay constraints, and live video (with tight delay constraints. Simulations are performed by selectively abstracting the PHY layer, accurately modeling the MAC layer, and following established network evaluation methods. The numerical results demonstrate that queue- and channel-aware QoS schedulers can and should be used in an LTE downlink to offer QoS to a diverse mix of traffic, including delay-sensitive flows. Through these results and via theoretical analysis, we illustrate the various design tradeoffs that need to be made in the selection of a specific queue-and-channel-aware scheduling policy. Moreover, the numerical results show that in many scenarios strict prioritization across traffic classes is suboptimal.

  16. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  17. Observing of chain-schedule stimuli.

    Science.gov (United States)

    Slezak, Jonathan M; Anderson, Karen G

    2014-06-01

    A classical-conditioning account of the processes maintaining behavior under chained schedules entails a backward transmission of conditioned-reinforcement effects. Assessing this process in traditional chain schedules is limited because the response maintained by stimulus onset accompanied by each link in a chain schedule may also be maintained by the primary reinforcer. In the present experiment, an observing response was used to measure the conditioned-reinforcing effects of stimuli associated with a three-link chain variable-time (VT) food schedule, and resistance-to-change tests (extinction and prefeeding) were implemented to examine if a backward transmission of reinforcement effects occur. Four pigeons served as subjects. Observing was maintained by the production of stimuli correlated with links of a three-link chain VT schedule with the middle-link stimulus maintaining the highest rate of observing, followed by the initial-link stimulus and the terminal-link stimulus maintaining the lowest observing rate. Results from resistance-to-change tests of extinction and prefeeding were not supportive of a backward transmission of reinforcement effects and in general, the pattern of resistance-to-change was forward. Based on past and current research, it appears that a backward pattern of relative rate decreases in responses maintained by stimuli correlated with a chain schedule due to disruption (i.e., extinction and prefeeding) is not a ubiquitous process that is evident within different chain-schedule arrangements.

  18. STATUS OF SCHEDULE TRIBES IN ANDHRA PRADESH

    Directory of Open Access Journals (Sweden)

    Dr. P. Subramanyachary

    2013-01-01

    Full Text Available Schedule Tribes (ST’s are Indian population groups that are explicitly recognized by the constitution of India order 1950. The order lists 744 tribes across 22 states in its first schedule. In Andhra Pradesh 33 types of Schedule Tribes are living in 8 districts. ST’s are 6.6% are in total population of Andhra Pradesh. They have rich heritage along with their innocent life style. As they are living in hill areas and forests they have some peculiar characters like indications of primitive traits, distinctive culture, and shyness of contact with other communities, geographical isolation, backwardness etc. So, for their development central and state governments are implementing different programmes and schemes since 1951. After the Ministry of Tribal affairs were constituted in 1999, there is more focus on development of Schedule Tribes in Indian society especially in Andhra Pradesh. The persisting problems like low literacy and high drop-outs, inadequate health services, lack of nutrition food, extreme poverty, and ineffective implementation of schemes etc are putting them away from economic development. Hence, there should be more commitment by both central and state government and local bodies to develop Schedule Tribes in the society. As literacy is 37% NGO’s and other voluntary organizations have to play key role to bring awareness among schedule tribes regarding programs and scheme for their development. Awareness and participation of Schedule Tribes in the implementation of policies leads to prosperity of ST community in the state as well as country.

  19. Development and use of schedules in education of elementary school children with ASD

    Directory of Open Access Journals (Sweden)

    Sharova Y.A.

    2015-09-01

    Full Text Available The work on preparedness for education of elementary school students with autism disorders can be greatly facilitated by the use of the methods that allow to structure child's knowledge about necessary changes. The use of schedules greatly facilitates the process of education, guiding and work on children's adaptation. The article describes stages of the work on inclusion and use of general and individual schedules in two groups of children with intellectual disabilities and autism spectrum disorders in preschool classes. This work was conducted in the Center for Psychological, Medical and Social Support to Children and Adolescents of the Moscow State University of Psychology and Education. The article contains examples of the use schedules to increase independence and to reduce anxiety in children with autism spectrum disorders.

  20. Comparative Study of Job Burnout Among Critical Care Nurses With Fixed and Rotating Shift Schedules

    DEFF Research Database (Denmark)

    Shamali, Mahdi; Shahriari, Mohsen; Babaii, Atye

    2015-01-01

    BACKGROUND: Nurses, as health care providers, are insurmountably obliged to the practice of shift work. Literature has reported shift working as one of the inducing factors of burnout. Despite numerous studies in this area, there are inconsistencies on the relationship between shift working...... and burnout among nurses, especially in those who work in critical care settings. OBJECTIVES: The aim of this study was to compare the occupational burnout in critical care nurses with and without fixed shift schedules. PATIENTS AND METHODS: In this comparative study, 130 nurses with rotating shift schedule...... and 130 nurses with fixed shift schedule from six university hospitals were selected using stratified random sampling. Maslach burnout inventory was used for data collection. Independent samples t-test, chi-square and one-way ANOVA tests were used to analyze the data. RESULTS: Most of the participants...

  1. An Optimal Transportation Schedule of Mobile Equipment

    Directory of Open Access Journals (Sweden)

    S. Guillén-Burguete

    2012-10-01

    Full Text Available Motivated by a problem faced by road construction companies, we develop a new model to obtain an optimaltransportation schedule of mobile machines which have to travel to execute tasks. In this problem, each task ischaracterized by the location where it is to be executed, a work-content in terms of machine-time units, and one ormore time intervals within which it can be performed. The machines can be transported from one location to anotherat any time, thus the problem has an indefinite number of variables. However, this indefinite number of variables canbe reduced to a definite one because, as we prove, the problem has an optimal solution in which the arrivals ofmachines occur only at certain time instants. The objective is to minimize the total transportation cost such that all thetasks are executed within their time intervals. The constraints ensuring that the tasks are processed within theirprescribed time intervals are nonlinear; nevertheless, due to the sets of the possible arrival times of the machinesforming bounded convex polyhedra, our problem can be transformed into a mixed integer linear program by the samedevice used in the decomposition principle of Dantzig-Wolfe.

  2. Scheduling of Multiple Chillers in Trigeneration Plants

    Directory of Open Access Journals (Sweden)

    Chris Underwood

    2015-10-01

    Full Text Available The scheduling of both absorption cycle and vapour compression cycle chillers in trigeneration plants is investigated in this work. Many trigeneration plants use absorption cycle chillers only but there are potential performance advantages to be gained by using a combination of absorption and compression chillers especially in situations where the building electrical demand to be met by the combined heat and power (CHP plant is variable. Simulation models of both types of chillers are developed together with a simple model of a variable-capacity CHP engine developed by curve-fitting to supplier’s data. The models are linked to form an optimisation problem in which the contribution of both chiller types is determined at a maximum value of operating cost (or carbon emission saving. Results show that an optimum operating condition arises at moderately high air conditioning demands and moderately low power demand when the air conditioning demand is shared between both chillers, all recovered heat is utilised, and the contribution arising from the compression chiller results in an increase in CHP power generation and, hence, engine efficiency.

  3. Integration of process planning and production scheduling with particle swarm optimization (PSO) algorithm and fuzzy inference systems

    Science.gov (United States)

    Yang, Yahong; Zhao, Fuqing; Hong, Yi; Yu, Dongmei

    2005-12-01

    Integration of process planning with scheduling by considering the manufacturing system's capacity, cost and capacity in its workshop is a critical issue. The concurrency between them can also eliminate the redundant process and optimize the entire production cycle, but most integrated process planning and scheduling methods only consider the time aspects of the alternative machines when constructing schedules. In this paper, a fuzzy inference system (FIS) in choosing alternative machines for integrated process planning and scheduling of a job shop manufacturing system is presented. Instead of choosing alternative machines randomly, machines are being selected based on the machines reliability. The mean time to failure (MTF) values is input in a fuzzy inference mechanism, which outputs the machine reliability. The machine is then being penalized based on the fuzzy output. The most reliable machine will have the higher priority to be chosen. In order to overcome the problem of un-utilization machines, sometimes faced by unreliable machine, the particle swarm optimization (PSO) have been used to balance the load for all the machines. Simulation study shows that the system can be used as an alternative way of choosing machines in integrated process planning and scheduling.

  4. Optimal radiotherapy dose schedules under parametric uncertainty

    Science.gov (United States)

    Badri, Hamidreza; Watanabe, Yoichi; Leder, Kevin

    2016-01-01

    We consider the effects of parameter uncertainty on the optimal radiation schedule in the context of the linear-quadratic model. Our interest arises from the observation that if inter-patient variability in normal and tumor tissue radiosensitivity or sparing factor of the organs-at-risk (OAR) are not accounted for during radiation scheduling, the performance of the therapy may be strongly degraded or the OAR may receive a substantially larger dose than the allowable threshold. This paper proposes a stochastic radiation scheduling concept to incorporate inter-patient variability into the scheduling optimization problem. Our method is based on a probabilistic approach, where the model parameters are given by a set of random variables. Our probabilistic formulation ensures that our constraints are satisfied with a given probability, and that our objective function achieves a desired level with a stated probability. We used a variable transformation to reduce the resulting optimization problem to two dimensions. We showed that the optimal solution lies on the boundary of the feasible region and we implemented a branch and bound algorithm to find the global optimal solution. We demonstrated how the configuration of optimal schedules in the presence of uncertainty compares to optimal schedules in the absence of uncertainty (conventional schedule). We observed that in order to protect against the possibility of the model parameters falling into a region where the conventional schedule is no longer feasible, it is required to avoid extremal solutions, i.e. a single large dose or very large total dose delivered over a long period. Finally, we performed numerical experiments in the setting of head and neck tumors including several normal tissues to reveal the effect of parameter uncertainty on optimal schedules and to evaluate the sensitivity of the solutions to the choice of key model parameters.

  5. 78 FR 58264 - Refuge Alternatives for Underground Coal Mines

    Science.gov (United States)

    2013-09-23

    ... Coal Mines AGENCY: Mine Safety and Health Administration, Labor. ACTION: Request for information...) on Refuge Alternatives for Underground Coal Mines. This extension gives interested parties additional... for Underground Coal Mines. The RFI comment period had been scheduled to close on October 7, 2013....

  6. Remuneracion alternativa para los profesores (Alternative Teacher Compensation). ERIC Digest.

    Science.gov (United States)

    Goorian, Brad

    Legislators and school districts are reviewing alternative compensation plans in an effort to attract and retain qualified teachers. Limited merit-pay based plans have been abandoned, and the single salary schedule remains in place nationwide. A tight labor pool, greater scrutiny by legislatures, and new laws create pressures to raise salaries…

  7. Schedule Uncertainty Control: A Literature Review

    Science.gov (United States)

    Jun-yan, Liu

    Risk control on project schedule is one of the focus problems in the academic circle and the practical area all the time. Lots of research about risk control on project schedule have been fulfilled and many achievements have appeared in recent several decades. The literature on the techniques of schedule uncertainty control was reviewed. A summary analysis on those chievements is presented such as CPM, PERT, MC, BBN, and so on and in light of that summary analysis a deep discussion in terms of advantages and disadvantages of existing research has been analyzed, so that researchers can continue to refine their research.

  8. Multiprocessor Scheduling Using Parallel Genetic Algorithm

    Directory of Open Access Journals (Sweden)

    Nourah Al-Angari

    2012-07-01

    Full Text Available Tasks scheduling is the most challenging problem in the parallel computing. Hence, the inappropriate scheduling will reduce or even abort the utilization of the true potential of the parallelization. Genetic algorithm (GA has been successfully applied to solve the scheduling problem. The fitness evaluation is the most time consuming GA operation for the CPU time, which affect the GA performance. The proposed synchronous master-slave algorithm outperforms the sequential algorithm in case of complex and high number of generations problem.

  9. NEWS OF THE NATIONAL IMMUNIZATION SCHEDULE

    Directory of Open Access Journals (Sweden)

    O. V. Shamsheva

    2014-01-01

    Full Text Available The article presents the changes Immunization Schedule Russia introduced in 2014. In new Schedule now is the vaccination against pneumococcal disease for all children of 2 months with revaccination at 4 and 15 months old; excluded from the Schedule second revaccination against tuberculosis. At risk groups to be vaccinated against the flu, entered pregnant women and persons subject to military conscription. Recommendations on use of vaccines containing relevant antigens for the Russian Federation, to provide maximum effectiveness of immunization and vaccines that do not contain preservatives in children under 1 year of age. Offered to create a council of experts in the field of vaccinology and vaccine prevention

  10. Proposed Schedule for Fenton Hill Experiments

    Energy Technology Data Exchange (ETDEWEB)

    Albright, James N. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Brown, Donald W. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    1990-10-22

    To help in planning Fenton Hill experimental operations in concert with preparations for the Long-Term Flow Test (LTFT) next summer, the following schedule is proposed. This schedule fits some of the realities of the next few months, including the Laboratory closure during the Holidays, the seismic monitoring tests in Roswell, and the difficulties of operating during the winter months. Whenever possible, cyclic pumping operations during the colder months will be scheduled so that the pump will be on during the late evening and early morning hours to prevent freezeup.

  11. Scheduling and Subcontracting under Parallel Machines

    Institute of Scientific and Technical Information of China (English)

    CHEN Rong-jun; TANG Guo-chun

    2012-01-01

    In this paper,we study a model on joint decisions of scheduling and subcontracting,in which jobs(orders) can be either processed by parallel machines at the manufacturer in-house or subcontracted to a subcontractor.The manufacturer needs to determine which jobs should be produced in-house and which jobs should be subcontracted.Furthermore,it needs to determine a production schedule for jobs to be produced in-house.We discuss five classical scheduling objectives as production costs.For each problem with different objective functions,we give optimality conditions and propose dynamic programming algorithms.

  12. New schedulability analysis for WiDom

    OpenAIRE

    Vahabi, Maryam; Andersson, Björn

    2010-01-01

    WiDom is a wireless prioritized medium access control (MAC) protocol which offers a very large number of priority levels. Hence, it brings the potential for employing non-preemptive static-priority scheduling and schedulability analysis for a wireless channel assuming that the overhead of WiDom is modeled properly. One schedulability analysis for WiDom has already been proposed but recent research has created a new version of WiDom with lower overhead (we call it: WiDo...

  13. Concurrent Scheduling of Event-B Models

    CERN Document Server

    Boström, Pontus; Sere, Kaisa; Waldén, Marina; 10.4204/EPTCS.55.11

    2011-01-01

    Event-B is a refinement-based formal method that has been shown to be useful in developing concurrent and distributed programs. Large models can be decomposed into sub-models that can be refined semi-independently and executed in parallel. In this paper, we show how to introduce explicit control flow for the concurrent sub-models in the form of event schedules. We explore how schedules can be designed so that their application results in a correctness-preserving refinement step. For practical application, two patterns for schedule introduction are provided, together with their associated proof obligations. We demonstrate our method by applying it on the dining philosophers problem.

  14. Simultaneous scheduling of machines and mobile robots

    DEFF Research Database (Denmark)

    Dang, Vinh Quang; Nielsen, Izabela Ewa

    2013-01-01

    This paper deals with the problem of simultaneously scheduling machines and a number of autonomous mobile robots in a flexible manufacturing system (FMS). Besides capability of transporting materials between machines, the considered mobile robots are different from other material handling devices...... in terms of their advanced ability to perform tasks at machines by using their manipulation arms. The mobile robots thus have to be scheduled in relation to scheduling of machines so as to increase the efficiency of the overall system. The performance criterion is to minimize time required to complete all...

  15. Bridging the Gap Between Planning and Scheduling

    Science.gov (United States)

    Smith, David E.; Frank, Jeremy; Jonsson, Ari K.; Norvig, Peter (Technical Monitor)

    2000-01-01

    Planning research in Artificial Intelligence (AI) has often focused on problems where there are cascading levels of action choice and complex interactions between actions. In contrast. Scheduling research has focused on much larger problems where there is little action choice, but the resulting ordering problem is hard. In this paper, we give an overview of M planning and scheduling techniques, focusing on their similarities, differences, and limitations. We also argue that many difficult practical problems lie somewhere between planning and scheduling, and that neither area has the right set of tools for solving these vexing problems.

  16. Electrical engineering of engineers 2. Alternative current engineering, loci diagrams, transformers, multiphase systems. A lecture and working book for the basic study. 8 ed.; Elektrotechnik fuer Ingenieure 2. Wechselstromtechnik, Ortskurven, Transformator, Mehrphasensysteme. Ein Lehr- und Arbeitsbuch fuer das Grundstudium

    Energy Technology Data Exchange (ETDEWEB)

    Weissgerber, Wilfried

    2013-05-01

    The book under consideration covers the basics and calculation methods of the alternating current technology, the transformer, loci diagrams as well as three-phase systems. The book is dedicated to the students of engineering and natural sciences, electrical engineering, technical informatics and physics at higher institutes of applied sciences, technical colleges, universities and universities of cooperative education.

  17. A Data Scheduling and Management Infrastructure for the TEAM Network

    Science.gov (United States)

    Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.; Unwin, R.

    2009-04-01

    TEAM protocols with the logistical scheduling needs of each TEAM Site. For example, each TEAM protocol defines when data must be collected (e.g. time of day, number of times per year, during which seasons, etc) as well as where data must be collected (from which sampling units, which trees, etc). Each TEAM Site has a limited number of resources and must create plans that will both satisfy the requirements of the protocols as well as be logistically feasible for their TEAM Site. With 15 TEAM Sites (and many more coming soon) the schedules of each TEAM Site must be communicated to the Network Office to ensure data are being collected as scheduled and to address the many problems when working in difficult environments like Tropical Forests. The Sampling Schedule provides built-in proposal and approval functionality to ensure that the TEAM Sites are and the Network office are in sync as well as provides the capability to modify schedules when needed. The Data Management Framework The Data Management framework is a three-tier data ingestion, edit and review application for protocols defined in the TEAM network. The data ingestion framework provides online web forms for field personnel to submit and edit data collected at TEAM Sites. These web forms will be accessible from the TEAM content management site. Once the data is securely uploaded, cured, processed and approved, it will be made publicly available for consumption by the scientific community. The Data Management framework, when combined with the Sampling Scheduler provides a closed loop Data Scheduling and Management infrastructure. All information starting from data collection plan, tools to input, modify and curate data, review and run QA/QC tests, as well as verify data are collected as planed are included. Finally, TEAM Network data are available for download via the Data Query and Download Application. This application utilizes a Google Maps custom interface to search, visualize, and download TEAM Network data

  18. Does "grief work" work?

    NARCIS (Netherlands)

    Stroebe, M; Stroebe, W

    1991-01-01

    This article challenges the long-standing belief in the necessity of "grief work" for adjustment to bereavement. Evidence is offered from a prospective study of 30 widows and 30 widowers that indicates that grief work is not always as essential for adjustment to bereavement as theorists and clinicia

  19. Working together to improve usability

    DEFF Research Database (Denmark)

    Nørgaard, Mie; Hornbæk, Kasper

    2010-01-01

    In theory, usability work is an important and well-integrated activity in developing software. In practice, collaboration on improving usability is ridden with challenges relating to conflicting professional goals, tight project schedules, and unclear usability findings. The authors study those...

  20. Taming Time with Flexible Work.

    Science.gov (United States)

    Stamps, David

    1995-01-01

    Because of increasing incidence of burnout among midlevel managers, many companies are reducing workload schedules, an arrangement that would have been unthinkable 10 years ago. Surveys have made the case that flexible work arrangements increase employee happiness and, therefore, productivity. (JOW)

  1. Optimization of project payment schedules with Nash equilibrium model and genetic algorithm

    Institute of Scientific and Technical Information of China (English)

    DENG Ze-min; GAO Chun-ping; LI Zhong-xue

    2007-01-01

    To minimize the deviations of the net present values of project payment for both the owner and the client and optimize project payment schedules, a Nash equilibrium model based on game theory was set up and a genetic algorithm was developed to work out the Nash equilibrium solution with a two-stage backward inductive approach that requires the client responds to the owner's payment schedule with an activity schedule so as to maximize the client's net present value of cash flows. A case study demonstrated that a payment schedule at the Nash equilibrium position enables both the owner and the client to gain their desirable interests, thus is a win-win solution for both parties. Despite the computation time of the proposed algrithm in need of improving, combining Nash equilibrium and genetic algorithm into a complete-information dynamic-game model is a promising method for project management optimization.

  2. Resources Scheduling System for Collaborative Design in Ontology and Multi-agents

    Directory of Open Access Journals (Sweden)

    Liu Dianting

    2013-01-01

    Full Text Available A core issue of collaborative design is scheduling of design resources. In the collaborative design based on network, design resources often have some traits such as half-structured, distributed, isomerized and so on. Therefore, a kind of resources scheduling system based on the technology of ontology and the technology of multi-agents in collaborative design is proposed in this paper. The ontology models of design resources, and the algorithm of resources scheduling, and the function of each agent in system, and the flow of collaborative work among all agents are elaborated, and the software system of resources scheduling is studied and designed in this paper. The testing results show that the principle and method proposed in this paper are correct, and convenient in operation, and strong in practical application, and have high value in application and popularization.

  3. Ease crowding by adjusting physician schedules, adding a second rounding team.

    Science.gov (United States)

    2015-07-01

    A new study highlights how schedule changes among inpatient providers on the upper floors can impact crowding and boarding in the ED. Using Lean Six Sigma (LSS) management techniques, investigators at Penn State Hershey Children's Hospital in Hershey, PA, discovered that by adding an extra inpatient rounding team, discharge times could be accelerated, resulting in improved throughput without increasing length of stay or readmission rates. Data show that the scheduling adjustments enabled the hospital to slash 90 minutes off discharge times when compared with usual care. The scheduling changes enabled the hospital to discharge 45% more patients per day without increasing length-of-stay or readmission rates. To make the schedule changes, a core group of seven inpatient physicians needed to agree to work an extra two or three "on service" weeks per year. Investigators acknowledge that implementing this type of intervention requires culture change, which can be very difficult initially.

  4. Uncertainty management by relaxation of conflicting constraints in production process scheduling

    Science.gov (United States)

    Dorn, Juergen; Slany, Wolfgang; Stary, Christian

    1992-01-01

    Mathematical-analytical methods as used in Operations Research approaches are often insufficient for scheduling problems. This is due to three reasons: the combinatorial complexity of the search space, conflicting objectives for production optimization, and the uncertainty in the production process. Knowledge-based techniques, especially approximate reasoning and constraint relaxation, are promising ways to overcome these problems. A case study from an industrial CIM environment, namely high-grade steel production, is presented to demonstrate how knowledge-based scheduling with the desired capabilities could work. By using fuzzy set theory, the applied knowledge representation technique covers the uncertainty inherent in the problem domain. Based on this knowledge representation, a classification of jobs according to their importance is defined which is then used for the straightforward generation of a schedule. A control strategy which comprises organizational, spatial, temporal, and chemical constraints is introduced. The strategy supports the dynamic relaxation of conflicting constraints in order to improve tentative schedules.

  5. Multi-trip vehicle routing and scheduling problem with time window in real life

    Science.gov (United States)

    Sze, San-Nah; Chiew, Kang-Leng; Sze, Jeeu-Fong

    2012-09-01

    This paper studies a manpower scheduling problem with multiple maintenance operations and vehicle routing considerations. Service teams located at a common service centre are required to travel to different customer sites. All customers must be served within given time window, which are known in advance. The scheduling process must take into consideration complex constraints such as a meal break during the team's shift, multiple travelling trips, synchronisation of service teams and working shifts. The main objective of this study is to develop a heuristic that can generate high quality solution in short time for large problem instances. A Two-stage Scheduling Heuristic is developed for different variants of the problem. Empirical results show that the proposed solution performs effectively and efficiently. In addition, our proposed approximation algorithm is very flexible and can be easily adapted to different scheduling environments and operational requirements.

  6. Susceptibility of optimal train schedules to stochastic disturbances of process times

    DEFF Research Database (Denmark)

    Larsen, Rune; Pranzo, Marco; D’Ariano, Andrea;

    2013-01-01

    This work focuses on the stochastic evaluation of train schedules computed by a microscopic scheduler of railway operations based on deterministic information. The research question is to assess the degree of sensitivity of various rescheduling algorithms to variations in process times (running...... and dwell times). In fact, the objective of railway traffic management is to reduce delay propagation and to increase disturbance robustness of train schedules at a network scale. We present a quantitative study of traffic disturbances and their effects on the schedules computed by simple and advanced...... rescheduling algorithms. Computational results are based on a complex and densely occupied Dutch railway area; train delays are computed based on accepted statistical distributions, and dwell and running times of trains are subject to additional stochastic variations. From the results obtained on a real case...

  7. A fuzzy pert approach to evaluate plant construction project scheduling risk under uncertain resources capacity

    Directory of Open Access Journals (Sweden)

    Hsian Jong Hsiau

    2009-07-01

    Full Text Available A plant construction project always involves lots of activities. Precise information about the activities duration is unfortunately unavailable due to the uncertain resources capacity. The fuzzy program evaluation and review technique (PERT has been widely applied to solve the fuzzy project scheduling problem. This paper presents an extended fuzzy PERT approach with four major improvement aspects to support the construction project scheduling management: 1 Evaluate operation fuzzy times based on available working volumes, resources quantity and fuzzy capacity of resources, 2 Adopting a maximal alpha_i-level cut method to compare the fuzzy precedent activities times to determine the reasonable earliest starting times of each activity, 3 Using fuzzy algebra method instead of fuzzy subtraction method to compute the fuzzy latest starting times and 4 Developing a project scheduling risk index (PSRI to assist the decision maker to evaluate the project scheduling risk. Simulations experiments are conducted and demonstrated satisfactory results.

  8. The Application of Bayesian Optimization and Classifier Systems in Nurse Scheduling

    CERN Document Server

    Li, Jingpeng

    2008-01-01

    Two ideas taken from Bayesian optimization and classifier systems are presented for personnel scheduling based on choosing a suitable scheduling rule from a set for each persons assignment. Unlike our previous work of using genetic algorithms whose learning is implicit, the learning in both approaches is explicit, i.e. we are able to identify building blocks directly. To achieve this target, the Bayesian optimization algorithm builds a Bayesian network of the joint probability distribution of the rules used to construct solutions, while the adapted classifier system assigns each rule a strength value that is constantly updated according to its usefulness in the current situation. Computational results from 52 real data instances of nurse scheduling demonstrate the success of both approaches. It is also suggested that the learning mechanism in the proposed approaches might be suitable for other scheduling problems.

  9. Alternative medicine - pain relief

    Science.gov (United States)

    Alternative medicine refers to treatments that are used instead of conventional (standard) ones. If you use an alternative ... with conventional medicine or therapy, it is considered complementary therapy. There are many forms of alternative medicine. Acupuncture ...

  10. A Technique: Generating Alternative Thoughts

    Directory of Open Access Journals (Sweden)

    Serkan AKKOYUNLU

    2013-03-01

    Full Text Available Introduction: One of the basic techniques of cognitive therapy is examination of automatic thoughts and reducing the belief in them. By employing this, we can overcome the cognitive bias apparent in mental disorders. Despite this view, according to another cognitive perspective in a given situation, there are distinct cognitive representations competing for retrieval from memory just like positive and negative schemas. In this sense generating or strengthening alternative explanations or balanced thoughts that explain the situation better than negative automatic thoughts is one of the important process goals of cognitive therapy.Objective: Aim of this review is to describe methods used to generate alternative/balanced thoughts that are used in examining automatic thoughts and also a part of automatic thought records. Alternative/balanced thoughts are the summary and end point of automatic thought work. In this text different ways including listing alternative thoughts, using examining the evidence for generating balanced thoughts, decatastrophizing in anxiety and a meta-cognitive method named two explanations are discussed. Different ways to use this technique as a homework assignment is also reviewed. Remarkable aspects of generating alternative explanations and realistic/balanced thoughts are also reviewed and exemplified using therapy transcripts. Conclusion: Generating alternative explanations and balanced thoughts are the end point and important part of therapy work on automatic thoughts. When applied properly and rehearsed as homework between sessions, these methods may lead to improvement in many mental disorders

  11. Physician Fee Schedule Carrier Specific Files

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) has condensed all 56 Physician Fee Schedule (PFS) carrier specific pricing files into one zip file. It is...

  12. 29 CFR 1952.173 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ...) Inservice training plans for enforcement personnel will be developed within 18 months of plan approval. (f... Inspection Scheduling System will be fully implemented and in operation March 31, 1975....

  13. The GBT Dynamic Scheduling System: An Update

    Science.gov (United States)

    Clark, M. H.; Balser, D. S.; Braatz, J.; Condon, J.; Creager, R. E.; McCarty, M. T.; Maddalena, R. J.; Marganian, P.; O'Neil, K.; Sessoms, E.; Shelton, A. L.

    2011-07-01

    The Robert C. Byrd Green Bank Telescope's (GBT) Dynamic Scheduling System (DSS), in production use since September 2009, was designed to maximize observing efficiency while maintaining the GBT's flexibility, improving data quality, and minimizing any undue adversity for the observers. Using observing criteria, observer availability and qualifications, three-dimensional weather forecasts, and telescope state, the DSS software is capable of optimally scheduling observers 24 to 48 hours in advance on a telescope having a wide-range of capabilities in a geographical location with variable weather patterns. Recent improvements for the GBT include an expanded frequency coverage (0.390-90 GHz), proper treatment of fully sampled array receivers, increasingly diverse observing criteria, the ability to account for atmospheric instability from clouds, and new tools for scheduling staff to control and interact with generated schedules and the underlying database.

  14. NASA Deep Space Network Operations Scheduling

    Science.gov (United States)

    Enari, D. M.

    The functioning of the Deep Space Network Operations Scheduling, Jet Propulsion Laboratory, CA is reviewed. The primary objectives of the Operations Scheduling are: to schedule the worldwide global allocation of ground communications, tracking facilities, and equipment; and to provide deep space telecommunications for command, tracking, telemetry, and control in support of flight mission operations and tests. Elements of the earth set are Deep Space Stations (DSS) which provide the telecommunications link between the earth and spacecraft; NASA Communications Network; Network Data Processing Area; Network Operations Control Area which provides operational direction to the DSS; Mission Control and Computing systems; and Mission Support areas which provide flight control of the spacecraft. Elements of the space set include mission priorities and requirements which determine the spacecraft queue for allocating network resources. Scheduling is discussed in terms of long-range (3 years), mid-range (8 weeks), and short-range (2 weeks).

  15. Onboard Autonomous Scheduling Intelligence System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Scheduling the daily activities of the crew on a human space mission is currently a cumbersome job performed by a large team of operations experts on the ground....

  16. Individualized Project Physics in a Modular Schedule.

    Science.gov (United States)

    Cange, Francis

    1985-01-01

    Project Physics is taught at Gibault High School (Waterloo, IL) using a modular schedule and learning activity packets. A description of the course, instructional strategies used, and the learning activity packets is provided. (JN)

  17. Oversubscribed Mission Scheduler Conflict Resolution System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The allocation and scheduling of limited communication assets to an increasing number of satellites and other spacecraft remains a complex and challenging problem....

  18. Home Appliance Load Scheduling with SEMIAH

    DEFF Research Database (Denmark)

    Jacobsen, Rune Hylsberg; Ghasem Azar, Armin; Zhang, Qi;

    2015-01-01

    The European research project SEMIAH aims at designing a scalable infrastructure for residential demand response. This paper presents the progress towards a centralized load scheduling algorithm for controlling home appliances taking power grid constraints and satisfaction of consumers into account....

  19. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  20. Hanford Site Environmental Surveillance Master Sampling Schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2000-01-27

    This document contains the CY2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed.