WorldWideScience

Sample records for agency contract requirements

  1. 20 CFR 670.320 - What are the requirements for award of contracts and payments to Federal agencies?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What are the requirements for award of contracts and payments to Federal agencies? 670.320 Section 670.320 Employees' Benefits EMPLOYMENT AND... Funding and Selection of Service Providers § 670.320 What are the requirements for award of contracts and...

  2. Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

    Science.gov (United States)

    Paxton, Joseph; Tucker, Brian

    2010-01-01

    This paper will present a model that uses the Supply-Chain Operations Reference (SCOR) model as a foundation for a framework to illustrate the information needed throughout a product lifecycle to support a healthy supply chain management function and the subsequent contract requirements to enable it. It will also show where in the supply chain the information must be extracted. The ongoing case study used to exemplify the model is NASA's (National Aeronautics and Space Administration) Ares I program for human spaceflight. Effective supply chain management and contract requirements are ongoing opportunities for continuous improvement within government agencies, specifically development of systems for human spaceflight operations. Multiple reports from the Government Accountability Office (GAO) reinforce this importance. The SCOR model is a framework for describing a supply chain with process building blocks and business activities. It provides a set of metrics for measuring supply chain performance and best practices for continuously improving. This paper expands the application of the SCOR to also provide the framework for defining information needed from different levels of the supply chain and at different phases of the lifecycle. These needs can be incorporated into contracts to enable more effective supply chain management. Depending on the phase of the lifecycle, effective supply chain management will require involvement from different levels of the organization and different levels of the supply chain.

  3. Contracting and Performance in Agencies

    DEFF Research Database (Denmark)

    Bjørnholt, Bente; Houlberg Salomonsen, Heidi; Rennison, Betina Wolfgang

    As part of New Public Management (NPM), contracting represents a supplement to the traditional hierarchical and rule-based managing of relations between actors in order to improve performance (Fortin and van Hassel 2000; Greve and Ejersbo 2002; Drewry et al. 2005; Verhoest 2005). To various degrees...... higher goal attainment when agency head experience that the department balance dialogue and autonomy with some element of control in the process of internal contracting (Bjørnholt and Salomonsen 2011). This implies, that effective steering include a combination of decentralized management...... and how a balanced use of internal contracting leads to a better performance. These findings are then theoretically interpreted based upon a combination of literature on agencification as well as public management. We compare contracting across all Danish agencies based on a combination of survey...

  4. Defense Contract Audit Agency Compensation Audits

    National Research Council Canada - National Science Library

    1999-01-01

    .... The Defense Contract Audit Agency (DCAA) assists the administrative contracting officer in accomplishing that responsibility by determining whether the contractor's compensation system is sound, reliable, consistently applied, and results...

  5. 75 FR 29404 - Contract Reporting Requirements of Intrastate Natural Gas Companies

    Science.gov (United States)

    2010-05-26

    ...; Order No. 735] Contract Reporting Requirements of Intrastate Natural Gas Companies May 20, 2010. AGENCY... revises the contract reporting requirements for those natural gas pipelines that fall under the Commission's jurisdiction pursuant to section 311 of the Natural Gas Policy Act or section 1(c) of the Natural...

  6. Evaluation of the Defense Contract Audit Agency Audit Coverage of Tricare Contracts

    National Research Council Canada - National Science Library

    Brannin, Patricia

    2000-01-01

    Our objective was to evaluate the adequacy of the Defense Contract Audit Agency (DCAA) audit coverage of contracts for health care provided under TRICARE and the former Civilian Health Care and Medical Program of the Uniformed Services...

  7. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Science.gov (United States)

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime... the subcontract for any reason, the recipient must require the prime contractor to employ the six good...

  8. AGENCY CONTRACTS – EXISTING REGULATIONS IN ROMANIAN LAWS

    Directory of Open Access Journals (Sweden)

    Cristina Cojocaru

    2012-11-01

    Full Text Available Agency contracts are created as legal instruments with a highly important role for the business activity, given that they are the basis for professional intermediation. Regulations have changed in time, in an attempt to offer a better apprehension of the notion and applicability of this type of contract through the legislative framework. In Romanian law, this type of contract was regulated for the first time by Law no. 509 in 2002 on permanent commercial agents, law that was repealed when the new Civil Code came into force on October 1, 2011.

  9. 41 CFR 102-73.70 - Are Executive agencies required to acquire leased space by negotiation?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are Executive agencies required to acquire leased space by negotiation? 102-73.70 Section 102-73.70 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 73-REAL ESTATE ACQUISITION...

  10. Contracting between public agencies and private psychiatric inpatient facilities.

    Science.gov (United States)

    Fisher, W H; Dorwart, R A; Schlesinger, M; Davidson, H

    1991-08-01

    Purchasing human services through contracts with private providers has become an increasingly common practice over the past 20 years. Using data from a national survey of psychiatric inpatient facilities, this paper examines the extent to which psychiatric units in privately controlled general hospitals and private psychiatric specialty hospitals (N = 611) participate in contractual arrangements to provide services to governmental bodies. It also examines how the likelihood of such a practice is affected by hospital characteristics (general or specialty, for profit or nonprofit) and features of hospitals' environments, including the competitiveness of the market for psychiatric inpatient care and the population's need for services in the hospital's county. The findings indicate that nonprofit psychiatric specialty hospitals were more likely than other types of hospitals to enter into such contracts, and that forces such as local competition and need for services were not predictors of such involvement. Contracting was shown to have a significant impact on the level of referrals a hospital accepted, but these levels were also affected by competition and need. Among hospitals with public contracts, referral acceptance from public agencies was unaffected by these factors, but they did have a significant effect on referral acceptance by hospitals without public contracts. These data suggest that public agencies contracting for services with private hospitals may represent a means by which "public sector" patients may gain access to private providers. Further, this mechanism may impose sufficient structure and regulation on the acceptance of such patients that many concerns of hospital administrators regarding patients who are costly and difficult to treat and discharge can be allayed.

  11. 41 CFR 105-74.645 - Federal agency or agency.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Federal agency or agency. 105-74.645 Section 105-74.645 Public Contracts and Property Management Federal Property Management... Administration 74-GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Definitions § 105-74...

  12. 24 CFR 232.605 - Contract requirements.

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the...

  13. 48 CFR 732.111 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111... CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may... Agency-specific indefinite quantity contracts that are a combination of contract types. Rather than using...

  14. 78 FR 68829 - Information Collection Requirement; Defense Federal Acquisition Regulation Supplement; Contract...

    Science.gov (United States)

    2013-11-15

    ... DFARS 252.232-7007, Limitation of Government's Obligation. DFARS subpart 232.7, Contract [[Page 68830...; Defense Federal Acquisition Regulation Supplement; Contract Financing AGENCY: Defense Acquisition... and OMB Number: Defense Federal Acquisition Regulation Supplement (DFARS) Part 232, Contract Financing...

  15. 24 CFR 1715.4 - Contract requirements and revocation.

    Science.gov (United States)

    2010-04-01

    ... breach of contract. (b) For the purposes of this section: Damages incurred by the seller or lessor means... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Contract requirements and..., SALES PRACTICES AND STANDARDS Purchasers' Revocation Rights § 1715.4 Contract requirements and...

  16. [The Brazilian National Health Surveillance Agency performance evaluation at the management contract model].

    Science.gov (United States)

    Moreira, Elka Maltez de Miranda; Costa, Ediná Alves

    2010-11-01

    The Brazilian National Health Surveillance Agency (Anvisa) is supervised by the Ministry of Health by means of a management contract, a performance evaluation tool. This case study was aimed at describing and analyzing Anvisa's performance evaluation model based on the agency's institutional purpose, according to the following analytical categories: the management contract formalization, evaluation tools, evaluators and institutional performance. Semi-structured interviews and document analysis revealed that Anvisa signed only one management contract with the Ministry of Health in 1999, updated by four additive terms. The Collegiate Board of Directors and the Advisory Center for Strategic Management play the role of Anvisa's internal evaluators and an Assessing Committee, comprising the Ministry of Health, constitutes its external evaluator. Three phases were identified in the evaluation model: the structuring of the new management model (1999-2000), legitimation regarding the productive segment (2001-2004) and widespread legitimation (2005). The best performance was presented in 2000 (86.05%) and the worst in 2004 (40.00%). The evaluation model was shown to have contributed little towards the agency's institutional purpose and the effectiveness measurement of the implemented actions.

  17. 75 FR 39034 - Public Housing Annual Contributions Contract

    Science.gov (United States)

    2010-07-07

    ... Contributions Contract AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The... Contributions Contract (ACC) with certain requirements applicable to all project and other requirements... Contributions Contract. OMB Approval Number: 2577-New. Form Numbers: Certain information collections do not have...

  18. 48 CFR 811.404 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.404... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 811.404 Contract clause. When delivery is required by or on a particular date for f.o.b. destination contracts, the contracting officer...

  19. 42 CFR 422.107 - Special needs plans and dual-eligibles: Contract with State Medicaid Agency.

    Science.gov (United States)

    2010-10-01

    ... with State Medicaid Agency. 422.107 Section 422.107 Public Health CENTERS FOR MEDICARE & MEDICAID... Medicaid Agency. (a) Definition. For the purpose of this section, a contract with a State Medicaid agency means a formal written agreement between an MA organization and the State Medicaid agency documenting...

  20. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  1. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  2. 48 CFR 2432.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Unusual contract financing... DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 2432.114 Unusual contract financing. The Senior Procurement Executive is the agency head for the purpose of...

  3. 48 CFR 970.1103-4 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1103... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1103-4 Contract clause. Insert the clause at 48 CFR 52.211-5, Material Requirements, in solicitations and contracts. ...

  4. 48 CFR 12.503 - Applicability of certain laws to Executive agency contracts for the acquisition of commercial items.

    Science.gov (United States)

    2010-10-01

    ... laws to Executive agency contracts for the acquisition of commercial items. 12.503 Section 12.503... COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items and Commercially... acquisition of commercial items. (a) The following laws are not applicable to Executive agency contracts for...

  5. 48 CFR 212.503 - Applicability of certain laws to executive agency contracts for the acquisition of commercial items.

    Science.gov (United States)

    2010-10-01

    ... laws to executive agency contracts for the acquisition of commercial items. 212.503 Section 212.503... ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items 212.503 Applicability of certain laws to executive agency contracts for the acquisition of...

  6. 48 CFR 801.602-73 - Review requirements for scarce medical specialist contracts and contracts for health-care resources.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Review requirements for scarce medical specialist contracts and contracts for health-care resources. 801.602-73 Section 801.602... Responsibilities 801.602-73 Review requirements for scarce medical specialist contracts and contracts for health...

  7. 48 CFR 11.304 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... Section 11.304 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Acceptable Material 11.304 Contract clause. Insert the clause at 52.211-5, Material Requirements, in solicitations and contracts for supplies that are not commercial items. ...

  8. 41 CFR 301-53.5 - Are there exceptions to the mandatory use of contract city-pair fares and an agency's travel...

    Science.gov (United States)

    2010-07-01

    ... the mandatory use of contract city-pair fares and an agency's travel management service? 301-53.5 Section 301-53.5 Public Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY... the mandatory use of contract city-pair fares and an agency's travel management service? Yes, the...

  9. 48 CFR 811.204 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.204 Section 811.204 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Using and Maintaining Requirements Documents 811.204 Contract...

  10. 7 CFR 1468.21 - Contract requirements.

    Science.gov (United States)

    2010-01-01

    ... net environmental and societal benefits; (ii) Refund with interest any program payments received and... under the CFO contract; (v) Supply information as required by CCC to determine compliance with the...

  11. 22 CFR 226.47 - Contract administration.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Contract administration. 226.47 Section 226.47 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.47 Contract administration. A...

  12. 22 CFR 226.48 - Contract provisions.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Contract provisions. 226.48 Section 226.48 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.48 Contract provisions. The...

  13. 48 CFR 207.103 - Agency-head responsibilities.

    Science.gov (United States)

    2010-10-01

    ... agency. (ii) Written plans are not required in acquisitions for a final buy out or one-time buy. The terms “final buy out” and “one-time buy” refer to a single contract that covers all known present and future requirements. This exception does not apply to a multiyear contract or a contract with options or...

  14. A Study of Placing Army Requirements on Contract

    Science.gov (United States)

    2016-04-01

    the program office in an integrated product team fashion under the leadership of the program manager. The U.S. Army contracting command is a key... fashion 46 A STUDY OF PLACING ARMY REQUIREMENTS ON CONTRACT  Our requirements can be routinely changed by the Acquisition Center. The reason for... consulted .  No, processes were unclear and if there are/were process, they were not communicated well with Program Office and even among the ACC personnel

  15. 5 CFR 300.405 - Requirement for contract.

    Science.gov (United States)

    2010-01-01

    ... principles and equal opportunity laws. ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Requirement for contract. 300.405 Section... (GENERAL) Use of Commercial Recruiting Firms and Nonprofit Employment Services § 300.405 Requirement for...

  16. 76 FR 55217 - Procedures for Protests and Contracts Dispute

    Science.gov (United States)

    2011-09-07

    ... an alleged breach of that contract. A contract dispute does not require, as a prerequisite, the...-0840; Amdt. No. 17-1] RIN 2120-AJ82 Procedures for Protests and Contracts Dispute AGENCY: Federal... contract disputes brought against or by the FAA. It also adds a voluntary dispute avoidance and early...

  17. 48 CFR 1532.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 1532.102 Section 1532.102 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING General 1532.102 Description of contract financing methods. Progress payments based on a percentage or stage of completion are authorized for use as...

  18. 76 FR 2035 - Procedures for Protests and Contracts Dispute

    Science.gov (United States)

    2011-01-12

    ... an alleged breach of that contract. A contract dispute does not require, as a prerequisite, the...-0840; Notice No. 10-18] RIN 2120-AJ82 Procedures for Protests and Contracts Dispute AGENCY: Federal... brought against the FAA and contract disputes brought against or by the FAA. It would also add a voluntary...

  19. 75 FR 29547 - Federal Acquisition Regulation; Information Collection; Contract Financing

    Science.gov (United States)

    2010-05-26

    ...; Information Collection; Contract Financing AGENCIES: Department of Defense (DoD), General Services... previously approved information collection requirement concerning contract financing. Public comments are... substantially changed the statutory authorities for Government financing of contracts. Sections 2001(f) and 2051...

  20. 41 CFR 102-118.260 - Must my agency send all quotations, tenders, or contracts with a TSP to GSA?

    Science.gov (United States)

    2010-07-01

    ... quotations, tenders, or contracts with a TSP to GSA? 102-118.260 Section 102-118.260 Public Contracts and... REGULATION TRANSPORTATION 118-TRANSPORTATION PAYMENT AND AUDIT Use of Government Billing Documents Quotations, Tenders Or Contracts § 102-118.260 Must my agency send all quotations, tenders, or contracts with a TSP to...

  1. 30 CFR 285.436 - Can MMS require lease or grant contraction?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Can MMS require lease or grant contraction? 285... Administration Lease Or Grant Contraction § 285.436 Can MMS require lease or grant contraction? At an interval no more frequent than every 5 years, the MMS may review your lease or grant area to determine whether the...

  2. 76 FR 44089 - Agency Information Collection (Offer To Purchase and Contract of Sale) Activity Under OMB Review

    Science.gov (United States)

    2011-07-22

    ... Purchase and Contract of Sale) Activity Under OMB Review AGENCY: Veterans Benefits Administration... Management and Budget (OMB) for review and comment. The PRA submission describes the nature of the... Purchase and Contract of Sale, VA Form 26-6705. b. Credit Statement of Prospective Purchaser, VA Form 26...

  3. 14 CFR 151.49 - Performance of construction work: Contract requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Contract... § 151.49 Performance of construction work: Contract requirements. (a) Contract provisions. In addition to any other provisions necessary to ensure completion of the work in accordance with the grant...

  4. 7 CFR Exhibit C to Subpart E of... - FmHA or Its Successor Agency Under Public Law 103-354 Financed Contract

    Science.gov (United States)

    2010-01-01

    ... or Its Successor Agency Under Public Law 103-354 Financed Contract To: Area Director, Office of... 7 Agriculture 12 2010-01-01 2010-01-01 false FmHA or Its Successor Agency Under Public Law 103-354 Financed Contract C Exhibit C to Subpart E of Part 1901 Agriculture Regulations of the Department of...

  5. Fluor Daniel Hanford contract standards/requirements identification document

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, G.L.

    1997-04-24

    This document, the Standards/Requirements Identification Document (S/RID) for the Fluor Daniel Hanford Contract, represents the necessary and sufficient requirements to provide an adequate level of protection of the worker, public health and safety, and the environment.

  6. 48 CFR 215.404-74 - Fee requirements for cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Fee requirements for cost... NEGOTIATION Contract Pricing 215.404-74 Fee requirements for cost-plus-award-fee contracts. In developing a fee objective for cost-plus-award-fee contracts, the contracting officer shall— (a) Follow the...

  7. 41 CFR 101-26.603 - Electronic items available from the Defense Logistics Agency.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Electronic items available from the Defense Logistics Agency. 101-26.603 Section 101-26.603 Public Contracts and Property... items available from the Defense Logistics Agency. Executive agencies shall satisfy their requirements...

  8. 78 FR 13743 - Department of State FY11 Service Contract Inventory

    Science.gov (United States)

    2013-02-28

    ... DEPARTMENT OF STATE [Public Notice 8207] Department of State FY11 Service Contract Inventory... Contract Inventory. SUMMARY: The Department of State has publically released its Service Contract Inventory... Act, Public Law 111-117, requires Department of State, and other civilian agencies, to submit an...

  9. Smart Contract Templates: essential requirements and design options

    OpenAIRE

    Clack, Christopher D.; Bakshi, Vikram A.; Braine, Lee

    2016-01-01

    Smart Contract Templates support legally-enforceable smart contracts, using operational parameters to connect legal agreements to standardised code. In this paper, we explore the design landscape of potential formats for storage and transmission of smart legal agreements. We identify essential requirements and describe a number of key design options, from which we envisage future development of standardised formats for defining and manipulating smart legal agreements. This provides a prelimin...

  10. 76 FR 4112 - Federal Acquisition Regulation; Submission for OMB Review; Contract Financing

    Science.gov (United States)

    2011-01-24

    ...; Submission for OMB Review; Contract Financing AGENCIES: Department of Defense (DOD), General Services... approved information collection requirement concerning contract financing. A notice was published in the... substantially changed the statutory authorities for Government financing of contracts. Sections 2001(f) and 2051...

  11. 48 CFR 41.204 - GSA areawide contracts.

    Science.gov (United States)

    2010-10-01

    ... service suppliers for the provision of service within the supplier's franchise territory or service area... a requirement for utility services within an area covered by an areawide contract shall acquire... administrative requirements of the agency, applicable rate schedules, technical information and detailed maps or...

  12. 77 FR 7242 - Agency Information Collection (Contract for Training and Employment): Activity Under OMB Review

    Science.gov (United States)

    2012-02-10

    ... Human Resources and Housing Branch, New Executive Office Building, Room 10235, Washington, DC 20503 (202... for Training and Employment): Activity Under OMB Review AGENCY: Veterans Benefits Administration... . Please refer to ``OMB Control No. 2900-0677.'' SUPPLEMENTARY INFORMATION: Title: Contract for Training...

  13. Supplier behaviour and public contracting in the English agency nursing market.

    Science.gov (United States)

    Lonsdale, Chris; Kirkpatrick, Ian; Hoque, Kim; de Ruyter, Alex

    2010-01-01

    The worldwide expansion in the use of private firms to deliver public services and infrastructure has promoted a substantial literature on public sector contract and relationship management. This literature is currently dominated by the notion that supplier relationships should be based upon trust. Less prominent are more sceptical approaches that emphasize the need to assiduously manage potential supplier exploitation and opportunism. This article addresses this imbalance by focusing upon the recent experience of the English National Health Service (NHS) in its dealings with its nursing agencies. Between 1997 and 2001, the NHS was subjected to considerable exploitation and opportunism. This forced managers to adopt a supply strategy based upon an assiduous use of e-auctions, framework agreements and quality audits. The article assesses the effectiveness of this strategy and reflects upon whether a more defensive approach to contract and relationship management offers a viable alternative to one based upon trust.

  14. 78 FR 80369 - Federal Acquisition Regulation; Service Contracts Reporting Requirements

    Science.gov (United States)

    2013-12-31

    ... (e.g., cost-reimbursement, time-and- materials, and labor-hour contracts), which already require... contract costs and labor can significantly fluctuate each year or how this type of labor can be comingled... of direct labor hours expended on the services performed is extremely concerning, particularly in a...

  15. Contract & agency labour: beyond self-regulation?

    OpenAIRE

    Cotton, Elizabeth

    2010-01-01

    A paper about the regulation of contract labour. Academic and legal aspects as well as case studies of global union federation work to organise and regulate contract labour in Thailand, Pakistan, Colombia, South Korea and at international level.

  16. Manufacturers’ Bids for WIC Infant Formula Rebate Contracts, 2003-2013

    OpenAIRE

    Oliveira, Victor; Davis, David

    2015-01-01

    The U.S. Department of Agriculture’s Special Supplemental Nutrition Program for Women, Infants, and Children (WIC) is the major purchaser of infant formula in the United States, and its mandatory rebate program saved WIC $1.9 billion in FY 2013. WIC State agencies are required by law to have competitively bid infant formula rebate contracts with infant formula manufacturers. Contracts are awarded to the manufacturer offering the WIC State agency the lowest net price (as determined by the manu...

  17. 78 FR 9865 - Air Carrier Contract Maintenance Requirements; Extension of Comment Period

    Science.gov (United States)

    2013-02-12

    .... FAA-2011-1136; Notice No. 12-07] RIN 2120-AJ33 Air Carrier Contract Maintenance Requirements... performing contract maintenance that are acceptable to the FAA and to include them in their maintenance... contract their maintenance. At the behest of several of their FAA-certificated air carrier members...

  18. 48 CFR 1352.237-72 - Security processing requirements-national security contracts.

    Science.gov (United States)

    2010-10-01

    ... requirements-national security contracts. 1352.237-72 Section 1352.237-72 Federal Acquisition Regulations... Provisions and Clauses 1352.237-72 Security processing requirements—national security contracts. As prescribed in 48 CFR 1337.110-70(d), use the following clause: Security Processing Requirements—National...

  19. 14 CFR 1204.403 - General requirements.

    Science.gov (United States)

    2010-01-01

    ... transaction has already been set-aside for small business by the contracting officer. (b) The appropriate... conferences and training sessions to inform small businesses of contracting opportunities with the Agency. (e) In accordance with Public Law 95-507, NASA will require contractors having contracts in excess of $1...

  20. Defense Threat Reduction Agency > Contracts > Contract Award Data

    Science.gov (United States)

    Integration Command Senior Enlisted Leader Media News News Archive Strategic Plan Videos Mission Research Support Center Contact Us FAQ Sheet Links Success Stories Contracts Business Opportunities Current Justifications & Approvals Careers Who We Are Our Values Strategic Recruiting Programs Professional

  1. Statutory Requirements of Teacher Contract Laws: A Comparison of the 50 States' Continuing Contract and Teacher Tenure Laws.

    Science.gov (United States)

    Gorkom, Kris Van

    This publication summarizes and compares legal provisions covering teacher tenure and contracts for each of the 50 states. The report is organized in three sections. Section 1 presents a summary comparison of the provisions of Washington's teacher contract law with corresponding statutory requirements of the other 49 states. Section 2 identifies…

  2. 75 FR 57906 - Membership of the Defense Contract Audit Agency Senior Executive Service Performance Review Boards

    Science.gov (United States)

    2010-09-23

    ... publication of this notice. FOR FURTHER INFORMATION CONTACT: Sandra L. Burrell, Chief, Human Resources Management Division, Defense Contract Audit Agency, 8725 John J. Kingman Road, Suite 2133, Fort Belvoir... following are the names and titles of DCAA career executives appointed to serve as members of the DCAA...

  3. 76 FR 59664 - Membership of the Defense Contract Audit Agency Senior Executive Service Performance Review Boards

    Science.gov (United States)

    2011-09-27

    ... Date: Upon publication of this notice. FOR FURTHER INFORMATION CONTACT: Sandra L. Burrell, Chief, Human Resources Management Division, Defense Contract Audit Agency, 8725 John J. Kingman Road, Suite 2133, Fort...(c)(4), the following are the names and titles of DCAA career executives appointed to serve as...

  4. 78 FR 32988 - Core Principles and Other Requirements for Designated Contract Markets; Correction

    Science.gov (United States)

    2013-06-03

    ... COMMODITY FUTURES TRADING COMMISSION 17 CFR Part 38 RIN 3038-AD09 Core Principles and Other... regarding Core Principles and Other Requirements for Designated Contract Markets by inserting a missing... regarding Core Principles and Other Requirements for Designated Contract Markets (77 FR 36612, June 19, 2012...

  5. 41 CFR 102-38.315 - Are we required to use Alternative Disputes Resolution for sales contracts?

    Science.gov (United States)

    2010-07-01

    ... Alternative Disputes Resolution for sales contracts? 102-38.315 Section 102-38.315 Public Contracts and... required to use Alternative Disputes Resolution for sales contracts? No, you are not required to use Alternative Disputes Resolution (ADR) for sales contracts. However, you are encouraged to use ADR procedures...

  6. Harmonizing formal requirements for cross-border sales contracts

    Directory of Open Access Journals (Sweden)

    Peter Winship

    2012-07-01

    Full Text Available Legal systems have different traditions about how to “prove” a contract for the sale of personal property. Most legal systems today permit the contract to be proved by any means but some States require that the agreement be concluded in or evidenced by writing. The United Nations Convention on Contracts for the International Sale of Goods adopts a freedom-of-form rule but authorizes a State to declare that the rule does not apply when the seller or buyer has its place of business in that State. This essay studies the consequences of such a declaration. The Convention text does not expressly state the consequences. The Convention’s travaux préparatoires suggest that this silence was deliberate. Doctrine and court opinions are divided on whether the writing formalities of the declaring State always apply or the formalities, if any, of the law applicable by virtue of the rules of private international law govern. In the absence of a consensus, this essay argues that the writing formalities of the declaring State apply. The argument is based on the policies implicit in the decision of non-declaring Contracting States to adhere to a Convention that allows certain Contracting States to opt out of the freedom-of-form rule. The result is consistent with recent private international law treaties that, while providing liberal rules that favor freedom of form, direct application of the fundamental policies not only of the forum but also of other jurisdictions.

  7. 41 CFR 102-192.120 - Must we have an agency mail manager?

    Science.gov (United States)

    2010-07-01

    ... mail manager? 102-192.120 Section 102-192.120 Public Contracts and Property Management Federal Property... MANAGEMENT Agency Mail Manager Requirements § 102-192.120 Must we have an agency mail manager? Yes, every Federal agency as defined in § 102-192.35 must have an agency mail manager. Agencies that are not “large...

  8. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  9. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  10. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    .... In anticipation of transitioning to the new contract payment system, the Defense Finance and Accounting Service and the Defense Contract Management Agency were attempting to close out as many contracts as possible...

  11. Virtual Leadership: The Influence of Transformational Leadership Style on Employee Satisfaction at the Defense Contract Management Agency

    Science.gov (United States)

    Johnson, Kevin A.

    2012-01-01

    The purpose of this quantitative correlational study was to examine the possible relationship between transformational leadership style behaviors and the influence it had on employee satisfaction. The information presented in this study involved virtual team members at the Defense Contract Management Agency, Navy Special Emphasis Operations. The…

  12. Procedures Manual: A Guide to Uniform Grant and Contract Management Standards and The Common Rule for Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments.

    Science.gov (United States)

    Conable, Sharon R.

    This manual has been compiled to provide consistent grant application and administrative procedures for state agencies which award grants or contracts to local governments. It provides a conceptual framework of information concerning the reporting, financial, contractual, and auditing requirements for recipients of Texas State Library grants…

  13. How to understand requirements of nuclear and defense welding contracts

    International Nuclear Information System (INIS)

    Dickinson, O.D.

    1986-01-01

    This paper presents a basic requirements control plan for contract documentation and software validation and maintenance for nuclear operation. The objective is designing an integrated configuration control plan of both old, new, large or small, critical and noncritical software programs. There are positive advantages to managing a planned requirements program for product delivery or business operations. A requirements baseline like this is preferable to many iterations of design effort in the maintenance of nonbaselined programs, documentation and software. The plan that applies program requirements needs to address different levels of criticality and define matching program requirements for those levels. The plan needs to describe old vs. new requirements and define scope/responsibility that is needed to support the design, development and completion of these program requirements. Presented are management goals, relative costs, quality assurance goals, and program assessment plans. Outlined is a set of program QA requirements and document/software functional requirements for planning of program; also presented are some criteria for criticality assessment to establish levels of contract documentation or software activity. The paper shows two examples of planning work on this configuration control plan. The integrated configuration control requirements plan can be computer based or paper based for activity. It is designed to cover existing or new requirements and to cover either no documentation or all documentation

  14. 41 CFR 300-70.1 - What are the requirements for reporting payments for employee travel and relocation?

    Science.gov (United States)

    2010-07-01

    ... Contracts and Property Management Federal Travel Regulation System GENERAL AGENCY REQUIREMENTS 70-AGENCY REPORTING REQUIREMENTS Requirement To Report Agency Payments for Employee Travel and Relocation § 300-70.1 What are the requirements for reporting payments for employee travel and relocation? Agencies (as...

  15. Performance contracting in central government in Denmark

    DEFF Research Database (Denmark)

    Kristiansen, Mads Bøge

    2015-01-01

    ) are observed across central government agencies, when the content of the performance contracts is compared. This makes it interesting to examine how variation in the content of the performance contracts across agencies can be explained? Based on a broad theoretical framework in which variation......This paper looks into performance contracting in Danish central government. Management by Objectives and Results (MBOR) was adopted in central government in Denmark during the 1980s and early 1990s. In 1991, performance contracts between parent ministries and their agencies were introduced...... in Danish central government. Since their introduction, performance contracts have become central elements in the steering and management of agencies in central government in Denmark, and today they are nearly universally adopted in central government. In Denmark, the Ministry of Finance is responsible...

  16. The distribution contracts: an Iberian approach

    Directory of Open Access Journals (Sweden)

    Sónia de Carvalho

    2016-12-01

    Full Text Available The contracts of commercial distribution are indispensable legal instruments to the development of the economic activity. The distribution, since the industrial revolution, acquired autonomy, given the necessity of specialized intermediation to distribute good and products. In this process, the structural organization of the distribution process suffered mutations, starting to assume a set of activities aiming at adjusting demand to supply, including, among others, clients canvassing, after-sales services, financing and assumption of risks, advisory services, promotion and advertising. The insufficiency of traditional contracts of purchase and sales and commission to satisfy the distributive needs caused by the industrial revolution will justify the development of new contractual schemes, such us agency contract, commercial concession and franchising. The obligation of the distributer to ensure the interests of the producer and to promote the distribution of the goods and services of the producer, in the context of a lasting relation of cooperation between the parts, through which the distributer is incorporated, with greater or minor intensity, in the producer distribution network, allowed us to sustain, as affirmed in the Portuguese and European literature, that distribution contracts could be framed in the same legal category. These contracts, as contracts that were shaped by praxis, do not have, with exception of agency contract, a legal framework in Portugal and Spain. It has been discussed in literature if agency contract legal framework can be applied, by analogy, to the contracts that fit in the legal category of distribution contracts. This paper aims at analyzing the legal framework of contracts of distribution in these legal systems, with the purpose to discuss the analogical application of the agency contract to these contracts.

  17. 75 FR 80571 - Core Principles and Other Requirements for Designated Contract Markets

    Science.gov (United States)

    2010-12-22

    ... Part II Commodity Futures Trading Commission 17 CFR Parts 1, 16, and 38 Core Principles and Other... CFR Parts 1, 16, and 38 RIN 3038-AD09 Core Principles and Other Requirements for Designated Contract... Principles 1. Subpart B--Designation as Contract Market 2. Subpart C--Compliance With Rules i. Proposed Sec...

  18. 75 FR 80685 - Contract Reporting Requirements of Intrastate Natural Gas Companies

    Science.gov (United States)

    2010-12-23

    ...; Order No. 735-A] Contract Reporting Requirements of Intrastate Natural Gas Companies Issued December 16... Storage Report for Intrastate Natural Gas and Hinshaw Pipelines. Order No. 735-A generally reaffirms the... reporting requirements for (1) intrastate natural gas pipelines \\2\\ providing interstate transportation...

  19. 41 CFR 301-71.1 - What is the purpose of an agency travel accounting system?

    Science.gov (United States)

    2010-07-01

    ... an agency travel accounting system? 301-71.1 Section 301-71.1 Public Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES AGENCY RESPONSIBILITIES 71-AGENCY TRAVEL ACCOUNTABILITY REQUIREMENTS General § 301-71.1 What is the purpose of an agency travel...

  20. 48 CFR 716.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  1. 3 CFR - Government Contracting

    Science.gov (United States)

    2010-01-01

    ... contract oversight could reduce such sums significantly. Government outsourcing for services also raises... a risk that taxpayer funds will be spent on contracts that are wasteful, inefficient, subject to... mission. In such cases, the agency must ensure that the risks associated with noncompetitive contracts are...

  2. 48 CFR 15.604 - Agency points of contact.

    Science.gov (United States)

    2010-10-01

    ... agency: upcoming solicitations; Broad Agency Announcements; Small Business Innovation Research programs; Small Business Technology Transfer Research programs; Program Research and Development Announcements; or... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 15.604 Agency points...

  3. Dual Support in Contract Workers' Triangular Employment Relationships

    Science.gov (United States)

    Buch, Robert; Kuvaas, Bard; Dysvik, Anders

    2010-01-01

    This study investigated the interplay between perceived investment in contract worker development by the "client" organization and contract workers' perceived organizational support from their temporary employment "agency." A study among 2021 contract workers from three temporary employment agencies in Norway showed that the…

  4. IAEA research contracts. Second annual report

    International Nuclear Information System (INIS)

    1962-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  5. IAEA research contracts. Second annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1962-07-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  6. 41 CFR 101-1.4902-2053 - GSA Form 2053, Agency Consolidated Requirements for GSA Regulations and Other External Issuances.

    Science.gov (United States)

    2010-07-01

    ...-2053 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.49-Illustrations of Forms § 101-1.4902-2053 GSA... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true GSA Form 2053, Agency...

  7. 26 CFR 1.6050M-1 - Information returns relating to persons receiving contracts from certain Federal executive agencies.

    Science.gov (United States)

    2010-04-01

    ... any other rule of contract law, express or implied, the amount of money or other property obligated... of this section— (1) Federal executive agency. The term “Federal executive agency” means— (i) Any... Commission. (2) Contract—(i) General rule. The term “contract” means an obligation of a Federal executive...

  8. 48 CFR 811.503 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.503... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Liquidated Damages 811.503 Contract clause. When the contracting... contracting officer must include the clause in 852.211-74, Liquidated damages, in the contract. ...

  9. 41 CFR 51-5.2 - Mandatory source requirement.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Mandatory source requirement. 51-5.2 Section 51-5.2 Public Contracts and Property Management Other Provisions Relating to... such as the Defense Logistics Agency and the General Services Administration, and certain commercial...

  10. 41 CFR 102-192.125 - What is the appropriate managerial level for an agency mail manager?

    Science.gov (United States)

    2010-07-01

    ... managerial level for an agency mail manager? 102-192.125 Section 102-192.125 Public Contracts and Property... ADMINISTRATIVE PROGRAMS 192-MAIL MANAGEMENT Agency Mail Manager Requirements § 102-192.125 What is the appropriate managerial level for an agency mail manager? The agency mail manager should be at a managerial...

  11. The use of managing agencies in decommissioning

    International Nuclear Information System (INIS)

    Nelson, R.L.

    1994-01-01

    On 1 April 1994 UKAEA Government Division was formed and one of its main responsibilities is the safe and cost effective management of the facilities which have already closed and the fuel reprocessing and radioactive waste management plant required to assist in the current programme of decommissioning. UKAEA Government Division, working on behalf of DTI, is intended to be a lean and efficient programme management and procurement organisation. Rather than build up its own project management capability it intends to use external resources for this function, obtained in future by competitive tendering. For each major facility undergoing decommissioning a Managing Agency has been, or will be, appointed to act on behalf of UKAEA Government Division. The responsibilities of each Managing Agency will be to assist in the definition of tasks, the commissioning of option studies and safety studies, the specification of individual contracts, management of the tendering processes and the subsequent management of the Implementation Contractors carrying out the decommissioning work, including the associated safety and training responsibilities. Teams involved in Managing Agency work require skills in project management, relevant technical issues, contract and safety management. (author)

  12. 48 CFR 970.1504 - Contract pricing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  13. 48 CFR 747.507 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 747.507 Section 747.507 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 747.507 Contract clauses. Contracting...

  14. Energy conservation. Federal shared energy savings contracting

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Milans, Flora H.; Kirk, Roy J.; Welker, Robert A.; Sparling, William J.; Butler, Sharon E.; Irwin, Susan W.

    1989-04-01

    A number of impediments have discouraged federal agencies from using shared energy savings contracts. As of November 30, 1988, only two federal agencies - the U.S. Postal Service (USPS) and the Department of the Army -had awarded such contracts even though they can yield significant energy and cost savings. The three major impediments we identified were uncertainty about the applicability of a particular procurement policy and practice, lack of management incentives, and difficulty in measuring energy and cost savings. To address the first impediment, the Department of Energy (DOE) developed a manual on shared energy savings contracting. The second impediment was addressed when the 100th Congress authorized incentives for federal agencies to enter into shared savings contracts. DOE addressed the third impediment by developing a methodology for calculating energy consumption and cost savings. However, because of differing methodological preferences, this issue will need to be addressed on a contract-by-contract basis. Some state governments and private sector firms are using performance contracts to reduce energy costs in their buildings and facilities. We were able to identify six states that were using performance contracts. Five have established programs, and all six states have projects under contract. The seven energy service companies we contacted indicated interest in federal shared energy savings contracting

  15. 29 CFR 4.107 - Federal contracts.

    Science.gov (United States)

    2010-07-01

    ... contracts to which any agency or instrumentality of the U.S. Government becomes a party pursuant to... distinction in this respect between such agencies and instrumentalities on the basis of their inclusion in or... corporate in form, or the fact that payment for the contract services is not made from appropriated funds...

  16. 48 CFR 745.106 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 745.106 Section 745.106 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 745.106 Contract clauses. (a) The contracting officer shall insert the...

  17. 48 CFR 1515.606-70 - Contracting methods.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contracting methods. 1515... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 1515.606-70 Contracting methods. The Department of Housing and Urban Development-Independent Agencies Appropriation Act...

  18. 48 CFR 842.101 - Contract audit responsibilities.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Audit Services 842.101 Contract audit responsibilities. (a) Contracting officers may use the support services of other agencies to the extent feasible. Examples of such services include: pre-award surveys; quality assurance and technical...

  19. Utility Energy Services Contracts: Enabling Documents

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-05-01

    Utility Energy Services Contracts: Enabling Documents provides materials that clarify the authority for Federal agencies to enter into utility energy services contracts (UESCs), as well as sample documents and resources to ease utility partnership contracting.

  20. 48 CFR 849.111-70 - Required review.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Required review. 849.111... MANAGEMENT TERMINATION OF CONTRACTS General Principles 849.111-70 Required review. (a) FAR 49.111 requires each agency to establish procedures, when necessary, for the administrative review of proposed...

  1. Corruption in PPPs, Incentives and Contract Incompleteness

    OpenAIRE

    Elisabetta Iossa; David Martimort

    2014-01-01

    In a public procurement setting, we discuss the desirability of completing contracts with state-contingent clauses providing for monetary compensations to the contractor when revenue shocks occur. Realized shocks are private information of the contractor and this creates agency costs of delegated service provision. Verifying the contractor’s messages on the shocks entails contracting costs that make incomplete contracts attractive, despite their higher agency costs. A public official (supervi...

  2. 77 FR 36611 - Core Principles and Other Requirements for Designated Contract Markets

    Science.gov (United States)

    2012-06-19

    ... vii. Sec. 38.156--Automated Trade Surveillance System viii. Sec. 38.157--Real-Time Market Monitoring...--Additional Requirements for Physical-Delivery Contracts iii. Sec. 38.253--Additional Requirements for Cash... Commission's oversight program, serving as a key tool for monitoring a DCM's compliance with the core...

  3. 77 FR 71458 - New International Mail Contract

    Science.gov (United States)

    2012-11-30

    ... Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a... Contracts 1. This document invites public comments on the request and addresses several related procedural... Reseller Expedited Package (GREP) contract (Contracts 1).\\1\\ It seeks to have the instant Contract included...

  4. 7 CFR 1466.21 - Contract requirements.

    Science.gov (United States)

    2010-01-01

    ... provisions of § 1466.26; (iii) Refund all program payments received on the transfer of the right and interest of the producer in land subject to the contract, unless the transferee of the right and interest... plan when the EQIP contract includes an animal waste management facility; (v) Implement a forest...

  5. 41 CFR 102-192.130 - What are your general responsibilities as an agency mail manager?

    Science.gov (United States)

    2010-07-01

    ... responsibilities as an agency mail manager? 102-192.130 Section 102-192.130 Public Contracts and Property... ADMINISTRATIVE PROGRAMS 192-MAIL MANAGEMENT Agency Mail Manager Requirements § 102-192.130 What are your general responsibilities as an agency mail manager? In addition to carrying out the responsibilities in Subparts B, C, D...

  6. Procurement of Contract Reconciliation Services by the Defense Logistics Agency

    National Research Council Canada - National Science Library

    1991-01-01

    The audit objective was to evaluate DLA's procedures for contracting with NSI to reconcile contracts before their transfer from the Defense Contract Administration Services Regions to the Defense Finance Center...

  7. Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

    Science.gov (United States)

    Paxton, Joe

    2010-01-01

    Enterprise Supply Chain Management consists of: Specifying suppliers to support inter-program and inter-agency efforts. Optimizing inventory levels and locations throughout the supply chain. Executing corrective actions to improve quality and lead time issues throughout the supply chain. Processing reported data to calculate and make visible supply chain performance (provide information for decisions and actions). Ensuring the right hardware and information is provided at the right time and in the right place. Monitoring the industrial base while developing, producing, operating and retiring a system. Seeing performance deep in the supply chain that could indicate issues affecting system availability and readiness.

  8. Moral hazard contracts: Does one size fit all?

    DEFF Research Database (Denmark)

    Koch, Alexander; Peyrache, Eloic

    2008-01-01

    We show that firms' practice of anonymous contracts ("one-size-fits-all") can be reconciled with standard agency theory if careers are marked by frequent transitions between employers, and agents have career concerns because complete long-term contracts are not feasible.......We show that firms' practice of anonymous contracts ("one-size-fits-all") can be reconciled with standard agency theory if careers are marked by frequent transitions between employers, and agents have career concerns because complete long-term contracts are not feasible....

  9. 77 FR 5280 - Service Contracts Inventory

    Science.gov (United States)

    2012-02-02

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0023] Service Contracts Inventory AGENCY: Nuclear...) is providing for public information its Inventory of Contracts for Services for Fiscal Year (FY) 2011. The inventory includes service contract actions over $25,000 that were awarded in FY 2011. ADDRESSES...

  10. 78 FR 10642 - Service Contracts Inventory

    Science.gov (United States)

    2013-02-14

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0029] Service Contracts Inventory AGENCY: Nuclear...) is providing for public information its Inventory of Contracts for Services for Fiscal Year (FY) 2012. The inventory includes service contract actions over $25,000 that were awarded in FY 2012. ADDRESSES...

  11. Contract engineers cut costs, and flexibility

    International Nuclear Information System (INIS)

    Bhargava, V.M.

    1991-01-01

    Today's rapid expansion of technology is an important reason for considering hiring contract engineering labor for your power plant because technical specialization is an important aspect of the contract engineering industry. This paper reports that another reason is addressing peak work loads. Any amount of technical assistance is available to assist in meeting schedules. Although a typical human resources department of a utility or architect/engineer may contain a few hundred active resumes, a contract engineering firm may have upwards of 40,000 resumes on file from all parts of the country. Because contract workers know that contract agencies keep abreast of client needs, they are more apt to forward updated resumes to such agencies. Used properly, a contract engineering company's services will augment the efforts of a human resources group and, in the case of some smaller companies, actually take the place of all internal recruiting efforts

  12. Improving Strategic Planning for Federal Public Health Agencies Through Collaborative Strategic Management

    Science.gov (United States)

    2013-03-01

    and Results Act (GPRA) was passed, requiring all federal agencies to engage in strategic planning and nudging them towards comprehensive strategic...involves the social- psychological process of sense making that leads to negotiations. This stage is when the individual partner organizations...expectations through informal bargaining and informal sense making Commitments For future action through formal legal contract or psychological contract

  13. 77 FR 71642 - New International Mail Contract

    Science.gov (United States)

    2012-12-03

    ... Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a... Services 3 contract. This document invites public comments on the request and addresses several related... Expedited Package Services (GEPS) 3 contract (Contract).\\1\\ The Notice was filed in accordance with 39 CFR...

  14. IAEA research contracts. First annual report

    International Nuclear Information System (INIS)

    1961-01-01

    The present volume is the first issue of what will become a regular annual publication by the Agency. It contains summaries of the final reports on all those contracts which have expired before 31 December 1960 with a few exceptions. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No.2, The investigation of electrophysiological responses of biological systems, in particular of nerve cells, to irradiation with small doses of X-ray and other types of ionizing radiation, Research Contract No.3, Investigation on the mode of the protective action of certain sulfhydryl compounds against radiation effects on the synthesis of deoxyribonucleic acid, using tritium-labelled thymidine, Research Contract No.6, Investigation and development of a new method of monitoring and dosimetry for low fluxes of fast neutrons, involving the use of a bubble chamber, Research Contract No.13, Effects of incorporated radioisotopes upon the stability of genetic materials, Research Contract No.16, Interrelationship of root absorption and leaf absorption of radioisotopes in herbaceous plants, Research Contract No. 23, The uptake of radioactive wastes by lowland rice from contaminated soils due to irrigation water and its decontamination, Research Contract No.28, Comparison between mutation rates induced by acute and chronic gamma irradiation

  15. IAEA research contracts. First annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1961-07-01

    The present volume is the first issue of what will become a regular annual publication by the Agency. It contains summaries of the final reports on all those contracts which have expired before 31 December 1960 with a few exceptions. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No.2, The investigation of electrophysiological responses of biological systems, in particular of nerve cells, to irradiation with small doses of X-ray and other types of ionizing radiation, Research Contract No.3, Investigation on the mode of the protective action of certain sulfhydryl compounds against radiation effects on the synthesis of deoxyribonucleic acid, using tritium-labelled thymidine, Research Contract No.6, Investigation and development of a new method of monitoring and dosimetry for low fluxes of fast neutrons, involving the use of a bubble chamber, Research Contract No.13, Effects of incorporated radioisotopes upon the stability of genetic materials, Research Contract No.16, Interrelationship of root absorption and leaf absorption of radioisotopes in herbaceous plants, Research Contract No. 23, The uptake of radioactive wastes by lowland rice from contaminated soils due to irrigation water and its decontamination, Research Contract No.28, Comparison between mutation rates induced by acute and chronic gamma irradiation.

  16. 75 FR 82095 - Service Contracts Inventory

    Science.gov (United States)

    2010-12-29

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0394] Service Contracts Inventory AGENCY: U.S. Nuclear...) is providing for public information its Inventory of Contracts for Services for Fiscal Year (FY) 2010. The inventory includes service contract actions over $25,000 that were awarded in FY 2010. ADDRESSES...

  17. 78 FR 55124 - Domestic Mail Contract

    Science.gov (United States)

    2013-09-09

    ... Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recent Postal Service filing seeking to add Parcel Select Contract 7 to the competitive product list. This... Postal Service filed a formal request and associated supporting information to add Parcel Select Contract...

  18. Report on Allegation of Unsatisfactory Conditions Regarding Actions by the Defense Contract Management Agency, Earned Value Management Center

    Science.gov (United States)

    2010-07-28

    object ivity of Defen se Contract Management Agency to carry ou t its ea rn ed va lue managemen t oversight responsibilities; and DCMA Response: Non...Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302...Earned Value Management Center Director advised us that the 2-week time frame was “standard operating procedure” for performing compliance reviews at

  19. 48 CFR 970.1170-2 - Contract provision.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract provision. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1170-2 Contract provision. The Contracting Officer shall insert the clause at 970.5211-1, Work authorization, in each...

  20. Choice of Contract Type and Other Policy Initiatives for Reducing Contract Prices

    Science.gov (United States)

    2013-09-01

    system franchise model). Assume that the contractor retained ownership of the design rights so that subsequent procurement lots are not open to...2 1. The Weapon System Franchise Model ..........................................................2 2. The Agency Problem and...40 2. Contracting for Time vs . Contracting for Performance ..............................41 B. Empirical Analysis of DoD Service

  1. 76 FR 31998 - Posting of Service Contract Inventory

    Science.gov (United States)

    2011-06-02

    ... OFFICE OF PERSONNEL MANAGEMENT Posting of Service Contract Inventory AGENCY: Office of Personnel... Web site an inventory of the services contracts exceeding $25,000 that were awarded by the agency in... 2010 Consolidated Appropriations Act, Public Law 111-117, and with a Memorandum from the Office of...

  2. Financial Management: Contracts Classified as Unreconcilable by the Defense Finance and Accounting Service Columbus (Contract DAAA09-81-G-2008-0031)

    National Research Council Canada - National Science Library

    Granetto, Paul J; Kornides, James L; Issel, John K; Knight, Clarence E., III; Frawley, John; Bennett, Karen M

    2005-01-01

    .... Defense Contract Management Agency (DCMA), Pittsburgh, Pennsylvania, personnel stated that the former Defense Contract Administration Services Region Philadelphia initially paid the contract until the payment function was transferred...

  3. 14 CFR 145.217 - Contract maintenance.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Contract maintenance. 145.217 Section 145...) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Operating Rules § 145.217 Contract maintenance. (a) A certificated repair station may contract a maintenance function pertaining to an article to an...

  4. 48 CFR 11.701 - Supply contracts.

    Science.gov (United States)

    2010-10-01

    ... DESCRIBING AGENCY NEEDS Variation in Quantity 11.701 Supply contracts. (a) A fixed-price supply contract may authorize Government acceptance of a variation in the quantity of items called for if the variation is... items in a fixed-price contract, within allowable variations, if any. If a contractor delivers a...

  5. Nitric oxide is required for the insulin sensitizing effects of contraction in mouse skeletal muscle.

    Science.gov (United States)

    Zhang, Xinmei; Hiam, Danielle; Hong, Yet-Hoi; Zulli, Anthony; Hayes, Alan; Rattigan, Stephen; McConell, Glenn K

    2017-12-15

    People with insulin resistance or type 2 diabetes can substantially increase their skeletal muscle glucose uptake during exercise and insulin sensitivity after exercise. Skeletal muscle nitric oxide (NO) is important for glucose uptake during exercise, although how prior exercise increases insulin sensitivity is unclear. In the present study, we examined whether NO is necessary for normal increases in skeletal muscle insulin sensitivity after contraction ex vivo in mouse muscle. The present study uncovers, for the first time, a novel role for NO in the insulin sensitizing effects of ex vivo contraction, which is independent of blood flow. The factors regulating the increase in skeletal muscle insulin sensitivity after exercise are unclear. We examined whether nitric oxide (NO) is required for the increase in insulin sensitivity after ex vivo contractions. Isolated C57BL/6J mouse EDL muscles were contracted for 10 min or remained at rest (basal) with or without the NO synthase (NOS) inhibition (N G -monomethyl-l-arginine; l-NMMA; 100 μm). Then, 3.5 h post contraction/basal, muscles were exposed to saline or insulin (120 μU ml -1 ) with or without l-NMMA during the last 30 min. l-NMMA had no effect on basal skeletal muscle glucose uptake. The increase in muscle glucose uptake with insulin (57%) was significantly (P contraction (140% increase). NOS inhibition during the contractions had no effect on this insulin-sensitizing effect of contraction, whereas NOS inhibition during insulin prevented the increase in skeletal muscle insulin sensitivity post-contraction. Soluble guanylate cyclase inhibition, protein kinase G (PKG) inhibition or cyclic nucleotide phosphodiesterase inhibition each had no effect on the insulin-sensitizing effect of prior contraction. In conclusion, NO is required for increases in insulin sensitivity several hours after contraction of mouse skeletal muscle via a cGMP/PKG independent pathway. © 2017 The Authors. The Journal of Physiology

  6. 78 FR 18966 - Publication of Fiscal Year 2012 Service Contract Inventory

    Science.gov (United States)

    2013-03-28

    ... COURT SERVICES AND OFFENDER SUPERVISION AGENCY FOR THE DISTRICT OF COLUMBIA Publication of Fiscal Year 2012 Service Contract Inventory AGENCY: Court Services and Offender Supervision Agency for the District of Columbia. ACTION: Notice of Public Availability of FY 2012 Service Contract Inventory. SUMMARY...

  7. Contract Attorneys Course Deskbook. Volume 2

    Science.gov (United States)

    2007-06-21

    Fed. Cir. 1994) (upholding the contractor’s submission of a subcontractor’s claim pursuant to a court order). 24-16 d. No claim vs . Defective...Non-DOD contract vehicles (orders placed by DOD and contracts awarded or orders placed by non-DOD entities on behalf of DOD, including franchise ...the federal agencies concerning who took what rights in a patent. Some agencies took title to the patent, while others left ownership with the

  8. 76 FR 73564 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2011-11-29

    ... Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration AGENCIES... Procurement Data System (FPDS). Additionally, changes are proposed for the clauses requiring contractor registration in the Central Contractor Registration (CCR) database and DUNS number reporting. DATES: Interested...

  9. Planing contract between the State and the Environment and energy mastership Agency 2000-2006; Contrat de plan entre l'Etat et l'Agence de l'environnement et de la maitrise de l'energie 2000-2006

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This contract describes the mutual commitments between the French State and the ADEME (Agency for the Environment and the Energy Mastership) for 2000-2006. The subjects concerned are the domestic wastes management, the energy efficiency and the energy resources development, the air pollution decrease and the international agreements of the France. It presents the implementing and expected impacts of the action and research and development programs, the ADEME research policy, the contract management and the evaluation. (A.L.B.)

  10. Financial Management: Contracts Classified as Unreconcilable by the Defense Finance and Accounting Service Columbus (Contract No. F30602-81-C-0153)

    National Research Council Canada - National Science Library

    Granetto, Paul J; Kornides, James L; Issel, John K; Knight, Clarence E., III; Bennett, Karen M

    2005-01-01

    .... The Defense Contract Management Agency (DCMA) office in Orlando, Florida, administered the contract until October 7, 1985, when the responsibility for contract administration was transferred to the DCMA office in Palm Bay, Florida...

  11. 20 CFR 653.111 - State agency staffing requirements.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false State agency staffing requirements. 653.111 Section 653.111 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR SERVICES... ethnic characteristics in the work force shall be distributed in substantially the same proportion among...

  12. 36 CFR 51.78 - Will a concession contract require a franchise fee and will the franchise fee be subject to...

    Science.gov (United States)

    2010-07-01

    ... require a franchise fee and will the franchise fee be subject to adjustment? 51.78 Section 51.78 Parks... Concession Contract Provisions § 51.78 Will a concession contract require a franchise fee and will the franchise fee be subject to adjustment? (a) Concession contracts will provide for payment to the government...

  13. 77 FR 75452 - New International Mail Contract

    Science.gov (United States)

    2012-12-20

    ... Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recently-filed Postal Service request to enter into an additional international mail contract. This... contract (Agreement).\\1\\ The Postal Service seeks to have the Agreement included within the GEPS 3 product...

  14. Utility Energy Services Contracts: Enabling Documents

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Karen; Vasquez, Deb

    2017-01-01

    The Federal Energy Management Program's 'Utility Energy Service Contracts: Enabling Documents' provide legislative information and materials that clarify the authority for federal agencies to enter into utility energy service contracts, or UESCs.

  15. IAEA research contracts. Seventh annual report

    International Nuclear Information System (INIS)

    1967-01-01

    This volume is the seventh annual report and presents full summaries of 52 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1966. Including these, a total of 188 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation

  16. IAEA research contracts. Sixth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1966-04-01

    This volume is the sixth annual report and presents full summaries of 37 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1965. Including these, a total of 136 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology.

  17. IAEA research contracts. Seventh annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1967-05-01

    This volume is the seventh annual report and presents full summaries of 52 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1966. Including these, a total of 188 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation.

  18. IAEA research contracts. Sixth annual report

    International Nuclear Information System (INIS)

    1966-01-01

    This volume is the sixth annual report and presents full summaries of 37 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1965. Including these, a total of 136 summaries have been published in the various fields in which support is provided under the IAEA Research contract program. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology

  19. 48 CFR 1516.405-2 - Cost-plus-award-fee contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Cost-plus-award-fee... AGENCY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1516.405-2 Cost-plus-award-fee contracts. ...

  20. Defense Threat Reduction Agency > Contracts > Business Opportunities

    Science.gov (United States)

    History Documents US Underground Nuclear Test History Reports NTPR Radiation Exposure Reports Enewetak Atoll Cleanup Documents TRAC About Who We Are Our Values History Locations Our Leadership Director Support Center Contact Us FAQ Sheet Links Success Stories Contracts Business Opportunities Current

  1. 77 FR 75200 - New International Mail Contract

    Science.gov (United States)

    2012-12-19

    ... Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recently-filed Postal Service request to enter into an additional international mail contract. This... contract (Agreement).\\1\\ The Notice was filed in accordance with 39 CFR 3015.5. Notice at 1. The Postal...

  2. 48 CFR 750.7110-5 - Contract files.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract files. 750.7110-5 Section 750.7110-5 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT... Interests of the United States 750.7110-5 Contract files. The fully executed action memorandum indicating...

  3. The removal of the consideration requirement, and the consequent clarification on duress, for verbal modifications to Irish construction contracts

    OpenAIRE

    Mooney, Conor Francis Joseph

    2015-01-01

    peer-reviewed This thesis studies the consideration requirement for verbally-made contract variations in Irish construction contracts, and proposes how this specific circumstance can be best served by the law of contract. Construction is a complex and uncertain industry; and an effective construction industry is important and necessary for Ireland: it is a key driver of a functioning, developed economy, and it requires a sustainable level of activity to maintain infrastructu...

  4. 48 CFR 1553.232 - Contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract financing. 1553.232 Section 1553.232 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.232 Contract financing. ...

  5. 76 FR 54242 - Agency Information Collection Activities: Post-Award Contract Information

    Science.gov (United States)

    2011-08-31

    ... Governmentwide implementation of e-Government initiatives, it is commonplace within many of DHS's Components for... documentation, Government estimate of contract price, contract modifications, Small Business Administration... information requested is used by the Government's contracting officers and other acquisition personnel...

  6. Defense Threat Reduction Agency > Contracts > Business Opportunities >

    Science.gov (United States)

    Atmospheric Nuclear Test History Documents US Underground Nuclear Test History Reports NTPR Radiation Exposure Reports Enewetak Atoll Cleanup Documents TRAC About Who We Are Our Values History Locations Our Leadership Support Center Contact Us FAQ Sheet Links Success Stories Contracts Business Opportunities Current

  7. Defense Threat Reduction Agency > Contracts > Small Businesses

    Science.gov (United States)

    business program portfolio. We are responsible by law and regulation for activities that range from policy Support Center Contact Us FAQ Sheet Links Success Stories Contracts Business Opportunities Current Your Reporting Day Senior Executive Service Special Programs OFFICE OF SMALL BUSINESS PROGRAMS The

  8. 78 FR 73237 - Reports, Forms and Record Keeping Requirements Agency Information Collection Activity Under OMB...

    Science.gov (United States)

    2013-12-05

    ...-0088] Reports, Forms and Record Keeping Requirements Agency Information Collection Activity Under OMB... entities over which the agency exercises regulatory authority. Recent trends lead the agency to estimate.... Requesters are not required to keep copies of any records or reports [[Page 73238

  9. 7 CFR 400.208 - Term of the contract.

    Science.gov (United States)

    2010-01-01

    ... writing to the other party that the contract is not to be renewed. Any breach of the contract, or failure... 7 Agriculture 6 2010-01-01 2010-01-01 false Term of the contract. 400.208 Section 400.208..., DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE REGULATIONS Agency Sales and Service Contract-Standards for...

  10. Use of time and materials and cost reimbursement subcontracts for remedial actions under the alternative remedial contracting strategy contracts. Directive

    International Nuclear Information System (INIS)

    1992-01-01

    The directive is intended to establish agency guidance on the use of time and materials and cost reimbursement contracts for remedial actions in general and to provide specific instruction regarding the use of these approaches in subcontracting under the Alternative Remedial Contracting Strategy (ARCS) contracts

  11. 76 FR 16043 - Agency Information Collection (Department of Veterans Affairs Acquisition Regulations Clause 852...

    Science.gov (United States)

    2011-03-22

    ... contracts for the acquisition of non-personal health care services. It requires the bidder/offeror prior to... Acquisition Regulation Clause 52.207-3, Right of First Refusal of Employment. An agency may not conduct or...

  12. IAEA research contracts. Fourth annual report

    International Nuclear Information System (INIS)

    1964-01-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  13. IAEA research contracts. Fourth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-04-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  14. 41 CFR 101-42.304 - Special requirements for donation of certain hazardous materials.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Special requirements for... Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS UTILIZATION... is the responsibility of the Federal holding agency or State agency to properly store hazardous...

  15. 77 FR 73699 - International Mail Contract

    Science.gov (United States)

    2012-12-11

    ... POSTAL REGULATORY COMMISSION [Docket No. CP2013-24; Order No. 1566] International Mail Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recent Postal... Service also identifies differences between the two contracts, such as the addition of several articles...

  16. 77 FR 73062 - International Mail Contract

    Science.gov (United States)

    2012-12-07

    ... POSTAL REGULATORY COMMISSION [Docket No. CP2013-23; Order No. 1562] International Mail Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recent Postal.... The Postal Service also identifies differences between the two contracts, such as revisions to...

  17. 48 CFR 1536.201 - Evaluation of contracting performance.

    Science.gov (United States)

    2010-10-01

    ... performance. 1536.201 Section 1536.201 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY... Contracting for Construction 1536.201 Evaluation of contracting performance. (a) The Contracting Officer will... will file the form in the contractor performance evaluation files which it maintains. (e) The Quality...

  18. Covenant Violations and Dynamic Loan Contracting

    DEFF Research Database (Denmark)

    Freudenberg, Felix; Imbierowicz, Björn; Saunders, Anthony

    2017-01-01

    This paper examines the dynamic allocation of control rights in private debt contracts of firms. We show that a covenant violation in the prior loan contract implies a stigma for borrowers which results in stricter loan contract terms in subsequent new loan contracts. Our analyses reject...... potentially other explanations such as firm characteristics or agency problems between the lender and firm management, shareholders or public debtholders. After covenant violations in the prior contract, new loans have on average 18 bps higher spreads and include more of those covenant types which also have...

  19. 77 FR 72412 - International Mail Contract

    Science.gov (United States)

    2012-12-05

    ... POSTAL REGULATORY COMMISSION [Docket No. CP2013-22; Order No. 1557] International Mail Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recent Postal... Service also identifies differences between the two contracts, such as the deletion of an article, the...

  20. Defense Contract Audit Agency Reviews of Price Proposals

    National Research Council Canada - National Science Library

    1998-01-01

    .... Auditors perform field pricing reviews of contractor price proposals when procurement office information is insufficient to perform the cost or price analysis needed to negotiate contract prices...

  1. 48 CFR 1536.209 - Construction contracts with architect-engineer firms.

    Science.gov (United States)

    2010-10-01

    ... architect-engineer firms. 1536.209 Section 1536.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1536.209 Construction contracts with architect-engineer firms. (a...

  2. 78 FR 17205 - Notice of Availability of Service Contract Inventories

    Science.gov (United States)

    2013-03-20

    ... FEDERAL MARITIME COMMISSION Notice of Availability of Service Contract Inventories AGENCY: Federal Maritime Commission. ACTION: Notice of availability of service contract inventories. FOR FURTHER... Service Contract Inventory Analysis, the FY 2012 Service Contract Inventory, and the FY 2012 Service...

  3. 76 FR 43892 - Modifications of Certain Derivative Contracts

    Science.gov (United States)

    2011-07-22

    ... obligations under the derivative contract and the party to which the rights and obligations are transferred or... assigning its rights and obligations under the contract and the party to which the rights and obligations... Modifications of Certain Derivative Contracts AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Final...

  4. 75 FR 16641 - Swine Contract Library

    Science.gov (United States)

    2010-04-02

    ...-AB06 Swine Contract Library AGENCY: Grain Inspection, Packers and Stockyards Administration, USDA... Library (SCL). The statutory authority for the library lapsed on September 30, 2005. On October 5, 2006... maintenance of a library of marketing contracts offered by certain packers to producers for the purchase of...

  5. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  6. 76 FR 7522 - Federal Acquisition Regulation; Enhancing Contract Transparency

    Science.gov (United States)

    2011-02-10

    ... transparency while retaining the protection of information that should be considered in the contracting process... the need for transparency in Government contracting information and believe these recommendations... Regulation; Enhancing Contract Transparency AGENCY: Department of Defense (DoD), General Services...

  7. 13 CFR 126.700 - What are the performance of work requirements for HUBZone contracts?

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What are the performance of work... ADMINISTRATION HUBZONE PROGRAM Contract Performance Requirements § 126.700 What are the performance of work... meet the performance of work requirements set forth in § 125.6(c) of this chapter. (b) In addition to...

  8. 48 CFR 52.222-53 - Exemption from Application of the Service Contract Act to Contracts for Certain Services...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Certain Services-Requirements. 52.222-53 Section 52.222... from Application of the Service Contract Act to Contracts for Certain Services—Requirements. As... Act to Contracts for Certain Services—Requirements (FEB 2009) (a) The services under this contract are...

  9. An Analysis of the Acquisition Process for Simplified Acquisition of Base Engineering Requirements (SABER) Contracts and Its Potential Impact on Contractor Performance

    National Research Council Canada - National Science Library

    Heaps, Brian

    2001-01-01

    The Simplified Acquisition of Base Engineering Requirements (SABER) contract's main purpose is to expedite contract award of civil engineer requirements through the issuance of individual delivery orders...

  10. 48 CFR 1536.602 - Selection of firms for architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ... architect-engineer contracts. 1536.602 Section 1536.602 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 1536.602 Selection of firms for architect-engineer contracts. ...

  11. Role of the contract workforce in the oilpatch

    International Nuclear Information System (INIS)

    Wake, G.

    1999-01-01

    The role of a staffing agency such as the Design Group Staffing Services Inc. was described. The Agency was founded in 1976. Today, it is the dominant agency in western Canada that provides technical, industrial, information technology and office services to its customers in the petroleum industry including Bantrel, Syncrude, Suncor, Delta, Nova, TransAlta, PanCanadian. A series of overhead viewgraphs accompanied this presentation which dealt with the all aspects of the contract workforce. A contractor was described as being a temporary worker and not a company employee. A 1996 survey has shown that the largest reported users of contract personnel were petroleum and petrochemical industries. This is partly due to the cyclical aspect of the petroleum industry in western Canada. The advantages and disadvantages of contract workforce were also described. The main reason for using contract workers is to provide organizations with the flexibility to meet fluctuations in demand. Other advantages include the ability to meet deadlines, minimize training time, eliminate legal liabilities, and reduce payroll and administration costs. Two of the disadvantages are the potential for high turnover and loyalty issues. The procedures and legalities of hiring contractors were also described. The importance of clearly distinguishing between a contract of employment (an employee) and a contract for service (an independent contractor) was also emphasized. 2 figs

  12. 7 CFR 1717.608 - RUS approval of contracts.

    Science.gov (United States)

    2010-01-01

    ... the contracts or arrangements, and regardless of whether or not a Federal power marketing agency is a party to any of them. (d) System management and maintenance contracts. RUS approval of contracts for the management and operation of a borrower's electric system or for the maintenance of the electric system is...

  13. 76 FR 51878 - Modifications of Certain Derivative Contracts; Correction

    Science.gov (United States)

    2011-08-19

    ...) * * * (1) Both the party transferring or assigning its rights and obligations under the derivative contract... Modifications of Certain Derivative Contracts; Correction AGENCY: Internal Revenue Service (IRS), Treasury... temporary regulations (TD 9538) that address when a transfer or assignment of certain derivative contracts...

  14. Planing contract between the State and the Environment and energy mastership Agency 2000-2006; Contrat de plan entre l'Etat et l'Agence de l'environnement et de la maitrise de l'energie 2000-2006

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This contract describes the mutual commitments between the French State and the ADEME (Agency for the Environment and the Energy Mastership) for 2000-2006. The subjects concerned are the domestic wastes management, the energy efficiency and the energy resources development, the air pollution decrease and the international agreements of the France. It presents the implementing and expected impacts of the action and research and development programs, the ADEME research policy, the contract management and the evaluation. (A.L.B.)

  15. Administration of Resale Stock Merchandise Contracts at the Defense Commissary Agency

    National Research Council Canada - National Science Library

    Young, Shelton

    1995-01-01

    ... and complied with, and to evaluate the effectiveness of related internal controls. Contract administration functions for the resale stock merchandise contracts were segregated among the service centers, regions, and commissary stores...

  16. IAEA research contracts. Fifth annual report

    International Nuclear Information System (INIS)

    1965-01-01

    This volume is the fifth annual report and presents full summaries of 26 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1964. In addition to the summaries describing more general work in 'Health physics and radiation protection', seven reports are included which describe work done under the Agency's first highly-coordinated programme in which various applications of Ca-47 in the fields of medicine and health physics were explored. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  17. IAEA research contracts. Fifth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1965-04-01

    This volume is the fifth annual report and presents full summaries of 26 final reports from contracts, sponsored under the Agency's Research Contract Programme, which were completed during 1964. In addition to the summaries describing more general work in 'Health physics and radiation protection', seven reports are included which describe work done under the Agency's first highly-coordinated programme in which various applications of Ca-47 in the fields of medicine and health physics were explored. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  18. Energy Savings Performance Contract Energy Sales Agreement Toolkit

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-14

    FEMP developed the Energy Savings Performance Contracting Energy Sales Agreement (ESPC ESA) Toolkit to provide federal agency contracting officers and other acquisition team members with information that will facilitate the timely execution of ESPC ESA projects.

  19. 23 CFR 635.105 - Supervising agency.

    Science.gov (United States)

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.105 Supervising agency. (a) The STD has responsibility... work with its own forces or by contract; provided the following conditions are met and the Division... compliance with subpart B of this part. (2) When the work is to be performed under a contract awarded by a...

  20. 22 CFR Appendix A to Part 226 - Contract Provisions

    Science.gov (United States)

    2010-04-01

    ... Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Pt. 226, App. A Appendix A to Part 226—Contract Provisions All contracts, awarded by... Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any...

  1. 77 FR 65577 - Notice of Continuation of Concession Contract

    Science.gov (United States)

    2012-10-29

    ... Continuation of Concession Contract AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: Pursuant to the terms of the listed concession contract, the National Park Service hereby gives public notice that it proposed to continue the concession contract listed below for a period not-to- exceed 1 year...

  2. 7 CFR 250.53 - Contract provisions.

    Science.gov (United States)

    2010-01-01

    ... the food service management company will ensure that its system of inventory management will not... recipient agency's fixed-price contract with a food service management company. Such provisions must also be... management company must credit the recipient agency for the value of all donated foods received for use in...

  3. 77 FR 38078 - Notice of Extension of Concession Contract

    Science.gov (United States)

    2012-06-26

    ... Extension of Concession Contract AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: Pursuant to the terms of the listed concession contract, the National Park Service hereby gives public notice... INFORMATION: The contract listed below will expire by its terms on October 31, 2013. Pursuant to 36 CFR 51.23...

  4. 48 CFR 1552.237-70 - Contract publication review procedures.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract publication review... journal article to the Project Officer, and one copy to the Contracting Officer. (d) If the Government has... AGENCY CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses...

  5. 41 CFR 51-7.3 - Ensuring environmental documents are actually considered in agency determinations.

    Science.gov (United States)

    2010-07-01

    ... contains requirements to ensure adequate consideration of environmental documents in agency decision-making... environmental documents as a part of their decision-making: (1) Action: Request. (2) Start of NEPA process: Upon... Property Management Other Provisions Relating to Public Contracts COMMITTEE FOR PURCHASE FROM PEOPLE WHO...

  6. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  7. 48 CFR 1516.303-76 - Fee on cost-sharing contracts by subcontractors.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Fee on cost-sharing... ENVIRONMENTAL PROTECTION AGENCY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 1516.303-76 Fee on cost-sharing contracts by subcontractors. (a) Subcontractors under prime cost...

  8. IAEA research contracts. Third annual report

    International Nuclear Information System (INIS)

    1963-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  9. IAEA research contracts. Third annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-04-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  10. Agile Contracts

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2014-01-01

    with “endless” re-negotiation of the requirements; you need a more flexible way to develop IS. A new way of coping with many changes is to use an agile development approach and a fixed budget and resources contract. This paper presents an example case. We analyse the case and design a guideline for how......When you have stable and non-ambiguous requirements then a classic contract for IS between a supplier and a public sector institution based on a requirements specification may be well suited. However, if you have to accept many changes or have ambiguous requirements then you may end up...... to implement a fixed budget and resources contract in the public sector. The guideline includes elements to cope with challenges in a tender process such as transparency, criteria for supplier selection, and live assessment of resource skills and capabilities, as well as achieving the flexibility for change...

  11. On Meta-norms as Use Policies Constraining Contracts and Contract Requirements

    NARCIS (Netherlands)

    King, T.C.; Dignum, M.V.; Van Riemsdijk, M.B.

    2013-01-01

    In multi-agent organizations, contractual obligations and prohibitions are important for governing autonomous agents. However, agents may only wish to participate in an organization if the contracts they engage in respect and satisfy their policies specifying how the agent may be used, we call these

  12. 76 FR 5431 - Publication of FY 2010 Service Contract Inventory

    Science.gov (United States)

    2011-01-31

    ... DEPARTMENT OF THE TREASURY Publication of FY 2010 Service Contract Inventory AGENCY: Departmental Offices, Treasury. ACTION: Notice of publication of Fiscal Year 2010 Service Contract Inventory. [[Page 5432

  13. 42 CFR 438.6 - Contract requirements.

    Science.gov (United States)

    2010-10-01

    ... specific to the enrolled population, by— (A) Eligibility category; (B) Age; (C) Gender; (D) Locality/region... adjustments for GME. (d) Enrollment discrimination prohibited. Contracts with MCOs, PIHPs, PAHPs, and PCCMs... activities); the Age Discrimination Act of 1975; the Rehabilitation Act of 1973; and the Americans with...

  14. 41 CFR 102-74.145 - What information must a Federal agency submit to GSA after the agency has identified a need for...

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What information must a Federal agency submit to GSA after the agency has identified a need for construction or alteration of a public building? 102-74.145 Section 102-74.145 Public Contracts and Property Management Federal Property Management Regulations System (Continued...

  15. Survey of extreme load design regulatory agency licensing requirements for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, J D

    1976-04-01

    Since 1965, when extreme load requirements began to be considered explicitly in nuclear power plant design, there has been a gradual divergence in requirements imposed by national regulatory agencies. However, nuclear plant safety is an international problem because of the potential international effects of any postulated plant failure. For this reason this paper has been prepared in an attempt to highlight the differences in national criteria currently used in the extreme load design of nuclear plant facilities. No attempt has been made to evaluate the relative merit of the criteria established by the various national regulatory agencies. This paper presents the results of a recent survey made of national atomic energy regulatory agencies and major nuclear steam supply design agencies, which requested a summary of current licensing criteria associated with earthquake, extreme wind (tornado), flood, airplane crash and accident (pipe break) loads applicable within the various national jurisdictions. Also presented are a number of comparisons which are meant to illustrate the differences in national regulatory criteria.

  16. Survey of extreme load design regulatory agency licensing requirements for nuclear power plants

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1976-01-01

    Since 1965, when extreme load requirements began to be considered explicitly in nuclear power plant design, there has been a gradual divergence in requirements imposed by national regulatory agencies. However, nuclear plant safety is an international problem because of the potential international effects of any postulated plant failure. For this reason this paper has been prepared in an attempt to highlight the differences in national criteria currently used in the extreme load design of nuclear plant facilities. No attempt has been made to evaluate the relative merit of the criteria established by the various national regulatory agencies. This paper presents the results of a recent survey made of national atomic energy regulatory agencies and major nuclear steam supply design agencies, which requested a summary of current licensing criteria associated with earthquake, extreme wind (tornado), flood, airplane crash and accident (pipe break) loads applicable within the various national jurisdictions. Also presented are a number of comparisons which are meant to illustrate the differences in national regulatory criteria. (Auth.)

  17. A Guide to Performance Contracting. A Presentation and Discussion of the Multiple Considerations Regarding Contracted Services in Local Education Agencies.

    Science.gov (United States)

    Adams, John W.; Kitchak, Karen H.

    This report provides a framework for evaluating the use of performance contracts. It serves as a working guide for those who are considering or are committed to performance contracts with public or private organizations. The topics cover (1) the theoretical basis and rationale of performance contracting, (2) the procurement model and the request…

  18. 48 CFR 47.205 - Availability of term contracts and basic ordering agreements for transportation or for...

    Science.gov (United States)

    2010-10-01

    ... TRANSPORTATION Contracts for Transportation or for Transportation-Related Services 47.205 Availability of term... is generally more economical and efficient for most agencies to make use of term contracts and basic... on behalf of other activities and agencies. For instance, GSA awards term contracts for services such...

  19. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  20. Requirements on a B2B e-contract language

    NARCIS (Netherlands)

    Angelov, S.; Grefen, P.W.P.J.

    2005-01-01

    Electronic contracts are the instrument to govern electronic trading relationships between business parties. A number of efforts exist in both the academic and industrial worlds to define an e-contract specification language. However, these efforts lack either universality or completeness. The main

  1. Fibroblast Cluster Formation on 3D Collagen Matrices Requires Cell Contraction-Dependent Fibronectin Matrix Organization

    Science.gov (United States)

    da Rocha-Azevedo, Bruno; Ho, Chin-Han; Grinnell, Frederick

    2012-01-01

    Fibroblasts incubated on 3D collagen matrices in serum or lysophosphatidic acid (LPA)-containing medium self-organize into clusters through a mechanism that requires cell contraction. However, in platelet-derived growth factor (PDGF)-containing medium, cells migrate as individuals and do not form clusters even though they constantly encounter each other. Here, we present evidence that a required function of cell contraction in clustering is formation of fibronectin fibrillar matrix. We found that in serum or LPA but not in PDGF or basal medium, cells organized FN (both serum and cellular) into a fibrillar, detergent-insoluble matrix. Cell clusters developed concomitant with FN matrix formation. FN fibrils accumulated beneath cells and along the borders of cell clusters in regions of cell-matrix tension. Blocking Rho kinase or myosin II activity prevented FN matrix assembly and cell clustering. Using siRNA silencing and function-blocking antibodies and peptides, we found that cell clustering and FN matrix assembly required α5β1 integrins and fibronectin. Cells were still able to exert contractile force and compact the collagen matrix under the latter conditions, which showed that contraction was not sufficient for cell clustering to occur. Our findings provide new insights into how procontractile (serum/LPA) and promigratory (PDGF) growth factor environments can differentially regulate FN matrix assembly by fibroblasts interacting with collagen matrices and thereby influence mesenchymal cell morphogenetic behavior under physiologic circumstances such as wound repair, morphogenesis and malignancy. PMID:23117111

  2. Fibroblast cluster formation on 3D collagen matrices requires cell contraction dependent fibronectin matrix organization.

    Science.gov (United States)

    da Rocha-Azevedo, Bruno; Ho, Chin-Han; Grinnell, Frederick

    2013-02-15

    Fibroblasts incubated on 3D collagen matrices in serum or lysophosphatidic acid (LPA)-containing medium self-organize into clusters through a mechanism that requires cell contraction. However, in platelet-derived growth factor (PDGF)-containing medium, cells migrate as individuals and do not form clusters even though they constantly encounter each other. Here, we present evidence that a required function of cell contraction in clustering is formation of fibronectin (FN) fibrillar matrix. We found that in serum or LPA but not in PDGF or basal medium, cells organized FN (both serum and cellular) into a fibrillar, detergent-insoluble matrix. Cell clusters developed concomitant with FN matrix formation. FN fibrils accumulated beneath cells and along the borders of cell clusters in regions of cell-matrix tension. Blocking Rho kinase or myosin II activity prevented FN matrix assembly and cell clustering. Using siRNA silencing and function-blocking antibodies and peptides, we found that cell clustering and FN matrix assembly required α5β1 integrins and fibronectin. Cells were still able to exert contractile force and compact the collagen matrix under the latter conditions, which showed that contraction was not sufficient for cell clustering to occur. Our findings provide new insights into how procontractile (serum/LPA) and promigratory (PDGF) growth factor environments can differentially regulate FN matrix assembly by fibroblasts interacting with collagen matrices and thereby influence mesenchymal cell morphogenetic behavior under physiologic circumstances such as wound repair, morphogenesis and malignancy. Copyright © 2012 Elsevier Inc. All rights reserved.

  3. 41 CFR 115-1.108 - Agency implementation and supplementation of FPMR.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Agency implementation and supplementation of FPMR. 115-1.108 Section 115-1.108 Public Contracts and Property Management Federal Property Management Regulations System (Continued) ENVIRONMENTAL PROTECTION AGENCY 1-INTRODUCTION...

  4. 41 CFR 301-75.205 - Is the interviewee required to submit a travel claim to us?

    Science.gov (United States)

    2010-07-01

    ... required to submit a travel claim to us? 301-75.205 Section 301-75.205 Public Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES AGENCY RESPONSIBILITIES 75... reimbursed, then he or she must submit a travel claim in accordance with your agency procedures in order to...

  5. 41 CFR 50-205.3 - Agreement with a State agency.

    Science.gov (United States)

    2010-07-01

    ..., consideration may be given to the State laws or regulations administered by the State agency providing safety... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Agreement with a State agency. 50-205.3 Section 50-205.3 Public Contracts and Property Management Other Provisions Relating to...

  6. 48 CFR 5416.203 - Fixed-price contracts with economic price adjustment.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Fixed-price contracts with economic price adjustment. 5416.203 Section 5416.203 Federal Acquisition Regulations System DEFENSE LOGISTICS AGENCY, DEPARTMENT OF DEFENSE TYPES OF CONTRACTS Fixed Price Contracts 5416.203 Fixed-price...

  7. Contract Audit Followup: Defense Contract Management Agency Santa Ana Office's Actions on Incurred Cost Audits

    National Research Council Canada - National Science Library

    2005-01-01

    This report addresses the DCMA Santa Ana District Office. DoD Directive 7640.2, "Policy for Follow-up on Contract Audit Reports," February 12, 1988, as amended August 16, 1995, implements OMB Circular A-50...

  8. 48 CFR 752.245-70 - Government property-USAID reporting requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Government property-USAID reporting requirements. 752.245-70 Section 752.245-70 Federal Acquisition Regulations System AGENCY FOR... recommendation, USAID contracts, except for those for commercial items, must contain the following preface and...

  9. 24 CFR 891.535 - Requirements for awarding construction contracts.

    Science.gov (United States)

    2010-04-01

    ... method of contract award under paragraph (c) of this section. In competitive bidding, sealed bids are... acceptance of such bid within a specified period after the opening, execute and deliver a contract in the... file) and that the bid is signed by a person authorized to bind the bidder. (4) Bidding shall be open...

  10. 48 CFR 937.7040 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 937.7040... CONTRACTING SERVICE CONTRACTING Protective Services Contracting 937.7040 Contract clauses. The contracting... services” in all protective services solicitations and contracts involving DOE-owned facilities requiring...

  11. 77 FR 6815 - Agency Information Collection Activities: Country of Origin Marking Requirements for Containers...

    Science.gov (United States)

    2012-02-09

    ... Activities: Country of Origin Marking Requirements for Containers or Holders AGENCY: U.S. Customs and Border... information collection requirement concerning Country of Origin Marking Requirements for Containers or Holders...: Title: Country of Origin Marking Requirements for Containers or Holders. OMB Number: 1651-0057. Form...

  12. 77 FR 23490 - Agency Information Collection Activities: Country of Origin Marking Requirements for Containers...

    Science.gov (United States)

    2012-04-19

    ... Activities: Country of Origin Marking Requirements for Containers or Holders AGENCY: U.S. Customs and Border... of Origin Marking Requirements for Containers or Holders. This is a proposed extension of an... Requirements for Containers or Holders. [[Page 23491

  13. Autonomy of State Agencies

    DEFF Research Database (Denmark)

    Hansen, Morten Balle; Niklasson, Birgitta; Roness, Paul

    agencies in four Nordic countries: Denmark, Finland, Norway and Sweden. By using survey data from more than 500 state agencies in the four countries, the article analyses whether there is indeed a Scandinavian style of autonomy and result control and assesses which structural, cultural, and environmental......NPM-doctrines states that ideal-type agencies should have a high level of managerial autonomy, while being controlled through result-based control instruments, like performance contracts. In this article, the authors present a first preliminary attempt to comparatively analyze the autonomy of state...... variables might explain similarities and differences in the autonomy of agencies....

  14. 42 CFR 435.136 - State agency implementation requirements for one-time notice and annual review system.

    Science.gov (United States)

    2010-10-01

    ...-time notice and annual review system. 435.136 Section 435.136 Public Health CENTERS FOR MEDICARE... agency implementation requirements for one-time notice and annual review system. An agency must— (a...) Establish an annual review system to identify individuals who meet the requirements of § 435.135 (a) or (c...

  15. 48 CFR 1552.242-72 - Financial administrative contracting officer.

    Science.gov (United States)

    2010-10-01

    ... Administrative Contracting Officer (FACO) is responsible for performing certain post-award functions related to the financial aspects of this contract when the EPA is the cognizant federal agency. These functions...) Negotiate advance agreements applicable to treatment of costs and to Independent Research & Development/Bid...

  16. 75 FR 52013 - Notice of Extension of Concession Contract

    Science.gov (United States)

    2010-08-24

    ... DEPARTMENT OF THE INTERIOR National Park Service Notice of Extension of Concession Contract AGENCY: National Park Service, Interior. ACTION: Public notice. DATES: Effective Date: January 1, 2013. FOR FURTHER... contract for a period of two years through December 31, 2014. SUPPLEMENTARY INFORMATION: The listed...

  17. Store-operated calcium entry is required for sustained contraction and Ca2+ oscillations of airway smooth muscle.

    Science.gov (United States)

    Chen, Jun; Sanderson, Michael J

    2017-05-15

    Airway hyper-responsiveness in asthma is driven by excessive contraction of airway smooth muscle cells (ASMCs). Agonist-induced Ca 2+ oscillations underlie this contraction of ASMCs and the magnitude of this contraction is proportional to the Ca 2+ oscillation frequency. Sustained contraction and Ca 2+ oscillations require an influx of extracellular Ca 2+ , although the mechanisms and pathways mediating this Ca 2+ influx during agonist-induced ASMC contraction are not well defined. By inhibiting store-operated calcium entry (SOCE) or voltage-gated Ca 2+ channels (VGCCs), we show that SOCE, rather than Ca 2+ influx via VGCCs, provides the major Ca 2+ entry pathway into ASMCs to sustain ASMCs contraction and Ca 2+ oscillations. SOCE may therefore serve as a potential target for new bronchodilators to reduce airway hyper-responsiveness in asthma. Asthma is characterized by airway hyper-responsiveness: the excessive contraction of airway smooth muscle. The extent of this airway contraction is proportional to the frequency of Ca 2+ oscillations within airway smooth muscle cells (ASMCs). Sustained Ca 2+ oscillations require a Ca 2+ influx to replenish Ca 2+ losses across the plasma membrane. Our previous studies implied store-operated calcium entry (SOCE) as the major pathway for this Ca 2+ influx. In the present study, we explore this hypothesis, by examining the effects of SOCE inhibitors (GSK7975A and GSK5498A) as well as L-type voltage-gated Ca 2+ channel inhibitors (nifedipine and nimodipine) on airway contraction and Ca 2+ oscillations and SOCE-mediated Ca 2+ influx in ASMCs within mouse precision-cut lung slices. We found that both GSK7975A and GSK5498A were able to fully relax methacholine-induced airway contraction by abolishing the Ca 2+ oscillations, in a manner similar to that observed in zero extracellular Ca 2+ ([Ca 2+ ] e ). In addition, GSK7975A and GSK5498A inhibited increases in intracellular Ca 2+ ([Ca 2+ ] i ) in ASMCs with depleted Ca 2+ -stores in

  18. 76 FR 28128 - Reports, Forms, and Record Keeping Requirements; Agency Information Collection Activity Under OMB...

    Science.gov (United States)

    2011-05-13

    ... information (106 agencies x 8 hours each = 848 hours total). These 8 hours will be expended on internal agency... the questionnaire, and speaking with the researchers should follow-up contacts be required. Personnel...

  19. Contracts and the institutional environment for electricity reform

    International Nuclear Information System (INIS)

    Danielsen, A.L.; Gupta, N.K.; Klein, P.G.

    1999-01-01

    Recent law and economics literature suggests that courts and administrative agencies should allow utilities to renegotiate supply contracts signed prior to restructuring, as an attractive alternative to continued regulatory oversight or possible bankruptcy. The central issue is whether contracting parties have a legal duty to fulfill their obligations under all circumstances without modification

  20. DOD Electronic Commerce (EC)/Electronic Data Interchange (EDI) in contracting report

    Science.gov (United States)

    1993-12-01

    Use of Electronic Commerce (EC)/Electronic Data Interchange (EDI) to support Department of Defense (DoD) procurement processes has been under consideration for some time. A 1988 Deputy Secretary of Defense memo calls for maximum use of EDI, based on 10 years of DoD EDI investigation and experiments. In 1990, Defense Management Review Decision 941 stated, 'The strategic goal of DoD's current efforts is to provide the department with the capability to initiate, conduct, and maintain its external business related transactions and internal logistics, contracting, and financial activities without requiring the use of hard copy media.' The EC in Contracting PAT membership reflected a broad cross section of Military Services and Defense Agencies working on a full-time basis for 60 days. The diversity of the EC in Contracting PAT ensured that the needs and concerns of all DoD components were addressed during the creation of the report. The resultant plan, therefore, represents a comprehensive approach for implementing EC throughout the DoD.

  1. Alternative staffing services. Contract transcription.

    Science.gov (United States)

    Tessier, C

    1992-03-01

    Contract medical transcription services can be of great assistance in meeting the demands for transcription, without jeopardizing patient, physician, or institutional confidentiality. You simply must require the contract service to provide at least the same degree of protection and preservation of confidentiality that you should require inhouse. To achieve this you must make these requirements explicit, comprehensive, comprehensible, believable, and enforceable. Discuss the requirements with prospective contractors. Review them at least annually with existing contractors and when contracts are due for renewal. Be sure to specify the consequence of breaching confidentiality, and if there are breaches, enforce the terms of the contract. Consult your institution's legal counsel both in developing the contract and in enforcing its provisions. Take into consideration your department's and institution's policies, AHIMA's statement on confidentiality, as well as local, state, and federal laws. Above all, never lose sight of the patient. Ultimately, it is not patient information that you are obligated to protect. It is the patient.

  2. Political corruption in the execution of public contracts

    OpenAIRE

    Chiappinelli, Olga

    2016-01-01

    This paper presents a novel theory of corruption in public procurement. It considers an agency setting of contract execution where the principal is a politician who can commit to a contract auditing policy. It is found that a benevolent politician, by choosing a sufficiently strict auditing, deters the contracting firm from padding costs, conversely, a selfish politician chooses a relatively lax auditing in order to create an incentive for cost-padding, and engages in corruption with the firm...

  3. 48 CFR 1552.214-71 - Contract award-other factors-formal advertising.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract award-other factors-formal advertising. 1552.214-71 Section 1552.214-71 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Texts of Provisions and Clauses 1552.214-71 Contract...

  4. Networks and informal contract law

    NARCIS (Netherlands)

    Tjong Tjin Tai, Eric; Brownsword, Roger; van Gestel, Rob A.J.; Micklitz, Hans-W.

    2017-01-01

    It is often argued that formal contract law cannot treat networks correctly. An analysis of networks in an informal contract law system shows that informal contract law is no panacea. Remaining problems require a different approach to legal regulation and contract practice.

  5. 41 CFR 102-118.25 - Does GSA still require my agency to submit its overall transportation policies for approval?

    Science.gov (United States)

    2010-07-01

    ... Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 118-TRANSPORTATION PAYMENT AND AUDIT General Introduction... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does GSA still require...

  6. 48 CFR 32.005 - Consideration for contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 32.005 Section 32.005 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING 32.005 Consideration for contract financing. (a) Requirement. When a contract financing clause is included at the inception of a contract, there shall be no...

  7. 41 CFR 101-39.103 - Agency appeals.

    Science.gov (United States)

    2010-07-01

    ...-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.1-Establishment, Modification, and Discontinuance of Interagency Fleet... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Agency appeals. 101-39.103 Section 101-39.103 Public Contracts and Property Management Federal Property Management...

  8. 41 CFR 109-38.203 - Agency identification.

    Science.gov (United States)

    2010-07-01

    ... Administrative Services, Logistics Management Division, Headquarters, using DOE Form 4250.2, “Requisition for... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Agency identification. 109-38.203 Section 109-38.203 Public Contracts and Property Management Federal Property Management...

  9. 77 FR 12925 - Federal Acquisition Regulation; Proper Use and Management of Cost-Reimbursement Contracts

    Science.gov (United States)

    2012-03-02

    ...-Reimbursement Contracts AGENCIES: Department of Defense (DoD), General Services Administration (GSA), and... addresses the use and management of cost- reimbursement contracts. DATES: Effective Date: April 2, 2012 FOR...-reimbursement contracts in the following three areas: 1. Circumstances when cost-reimbursement contracts are...

  10. Ranking Performance Measures in Multi-Task Agencies

    DEFF Research Database (Denmark)

    Christensen, Peter Ove; Sabac, Florin; Tian, Joyce

    2010-01-01

    We derive sufficient conditions for ranking performance evaluation systems in multi-task agency models (using both optimal and linear contracts) in terms of a second-order stochastic dominance (SSD) condition on the likelihood ratios. The SSD condition can be replaced by a variance-covariance mat......We derive sufficient conditions for ranking performance evaluation systems in multi-task agency models (using both optimal and linear contracts) in terms of a second-order stochastic dominance (SSD) condition on the likelihood ratios. The SSD condition can be replaced by a variance...

  11. 26 CFR 1.817-5 - Diversification requirements for variable annuity, endowment, and life insurance contracts.

    Science.gov (United States)

    2010-04-01

    ... issuer or holder of the variable contract must agree to make such adjustments or pay such amounts as may... quarter because of a discrepancy between the value of its assets and the diversification requirements unless such discrepancy exists immediately after the acquisition of any asset and such discrepancy is...

  12. 76 FR 2747 - Reports, Forms and Recordkeeping Requirements, Agency Information Collection Activity Under OMB...

    Science.gov (United States)

    2011-01-14

    ... entities over which the agency exercises regulatory authority. Recent trends lead the agency to estimate... confidential business information provisions of 49 CFR Part 512. Requesters are not required to keep copies of any records or reports submitted to us. As a result, the cost imposed to keep records would be zero...

  13. 48 CFR 301.603-72 - FAC-C and HHS SAC certification requirements.

    Science.gov (United States)

    2010-10-01

    ... HUMAN SERVICES GENERAL HHS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and... retention of certification, including the requirement to earn continuous learning points (CLPs). FAC-C... to employees for the first time at a department or agency.) (c) The FAC-C certification is based on...

  14. Federal Research and Development Contract Trends and the Supporting Industrial Base, 2000-2014

    Science.gov (United States)

    2016-04-30

    Homeland Security, and government-wide services contracting trends; sourcing policy and cost estimation methodologies; and recent U.S. Army modernization ...been fears that the sharp downturn in federal contract obligations would disproportionately impact the R&D contracting portfolios within individual...329 - contracting portfolios , and the industrial base that supports those efforts, within each R&D contracting agency. The main finding of this

  15. Evaluation Report on Defense Contract Audit Agency Audits of Requests for Equitable Adjustment

    National Research Council Canada - National Science Library

    1997-01-01

    Contractors may submit requests for equitable adjustment (REAs) of costs or prices as proposals under the Federal Acquisition Regulation governing contract modifications or as claims under the Contract Disputes Act...

  16. Optimal Long-Term Financial Contracting

    OpenAIRE

    Peter M. DeMarzo; Michael J. Fishman

    2007-01-01

    We develop an agency model of financial contracting. We derive long-term debt, a line of credit, and equity as optimal securities, capturing the debt coupon and maturity; the interest rate and limits on the credit line; inside versus outside equity; dividend policy; and capital structure dynamics. The optimal debt-equity ratio is history dependent, but debt and credit line terms are independent of the amount financed and, in some cases, the severity of the agency problem. In our model, the ag...

  17. Range Flight Safety Requirements

    Science.gov (United States)

    Loftin, Charles E.; Hudson, Sandra M.

    2018-01-01

    The purpose of this NASA Technical Standard is to provide the technical requirements for the NPR 8715.5, Range Flight Safety Program, in regards to protection of the public, the NASA workforce, and property as it pertains to risk analysis, Flight Safety Systems (FSS), and range flight operations. This standard is approved for use by NASA Headquarters and NASA Centers, including Component Facilities and Technical and Service Support Centers, and may be cited in contract, program, and other Agency documents as a technical requirement. This standard may also apply to the Jet Propulsion Laboratory or to other contractors, grant recipients, or parties to agreements to the extent specified or referenced in their contracts, grants, or agreements, when these organizations conduct or participate in missions that involve range flight operations as defined by NPR 8715.5.1.2.2 In this standard, all mandatory actions (i.e., requirements) are denoted by statements containing the term “shall.”1.3 TailoringTailoring of this standard for application to a specific program or project shall be formally documented as part of program or project requirements and approved by the responsible Technical Authority in accordance with NPR 8715.3, NASA General Safety Program Requirements.

  18. 78 FR 16678 - Agency Information Collection Activities; Proposed Collection; Comment Request; Requirements...

    Science.gov (United States)

    2013-03-18

    ... (44 U.S.C. 3501-3520), Federal Agencies must obtain approval from the Office of Management and Budget... packages and advertisements bear one of four required warning statements. Section 3(b)(3)(A) of the...

  19. Notice Requirements in Federal Acquisition Contracts.

    Science.gov (United States)

    1985-01-01

    oo o e o e *4 16 Development of the Court of Claims Dootrine....48 2. Impact of the Contract Disputes Act............ 56 3. Estoppel ...contractor elects Disputes Clause procedures, the waiver doctrine of Maney and Tapper is now a dead letter. 3. Estoppel Even though the government may...tative might give rise to a situation where the doctrine of equitable estoppel would preclude enforcement of the appeal period limitation. Prior to

  20. How Can We Best Achieve Contracting Unity of Effort in the CENTCOM Area of Responsibility?

    OpenAIRE

    Torres, Isaac; Ross, Marvin

    2013-01-01

    Approved for public release; distribution is unlimited. The purpose of this research is to investigate how to better achieve contracting unity of effort in the U.S. Central Command area of operations and the implications for other combatant commands in similar contingency situations. In the U.S. Central Command area of operations, numerous contracting agencies operate in Afghanistan, each with its own contract authority, but these agencies have little synchronization and no common operatin...

  1. 76 FR 33028 - Agency Information Collection (Requirements for Interest Rate Reduction Refinancing Loans...

    Science.gov (United States)

    2011-06-07

    ... (Requirements for Interest Rate Reduction Refinancing Loans) Activity Under OMB Review AGENCY: Veterans Benefits...: Requirements for Interest Rate Reduction Refinancing Loans. OMB Control Number: 2900-0601. Type of Review..., insured, or direct loan with a new loan at a lower interest rate provided that the veteran still owns the...

  2. An Analysis of Army Contract Administration With Regard to Contracting Officers Representatives

    Science.gov (United States)

    2016-09-01

    TO CONTRACTING OFFICER’S REPRESENTATIVES September 2016 By: Tanya V. Peel Angel R. Acevedo Advisors : Karen Landale Matthew Kremer...among contracting personnel and CORs requires improvement, staff levels need to be increased to support contract administration, managers nominate CORs...Landale, Lead Advisor Matthew Kremer, Support Advisor Brad Naegle Academic Associate Graduate School of Business and Public

  3. Agency Theory

    DEFF Research Database (Denmark)

    Linder, Stefan; Foss, Nicolai Juul

    Agency theory studies the problems and solutions linked to delegation of tasks from principals to agents in the context of conflicting interests between the parties. Beginning from clear assumptions about rationality, contracting and informational conditions, the theory addresses problems of ex...... ante (“hidden characteristics”) as well as ex post information asymmetry (“hidden action”), and examines conditions under which various kinds of incentive instruments and monitoring arrangements can be deployed to minimize the welfare loss. Its clear predictions and broad applicability have allowed...... agency theory to enjoy considerable scientific impact on social science; however, it has also attracted considerable criticism....

  4. Agency Theory

    DEFF Research Database (Denmark)

    Linder, Stefan; Foss, Nicolai Juul

    2015-01-01

    Agency theory studies the problems and solutions linked to delegation of tasks from principals to agents in the context of conflicting interests between the parties. Beginning from clear assumptions about rationality, contracting, and informational conditions, the theory addresses problems of ex...... ante (‘hidden characteristics’) as well as ex post information asymmetry (‘hidden action’), and examines conditions under which various kinds of incentive instruments and monitoring arrangements can be deployed to minimize the welfare loss. Its clear predictions and broad applicability have allowed...... agency theory to enjoy considerable scientific impact on social science; however, it has also attracted considerable criticism....

  5. IAEA research contracts. Ninth annual report

    International Nuclear Information System (INIS)

    1969-01-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation

  6. IAEA research contracts. Ninth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1969-06-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation.

  7. 41 CFR 102-37.125 - What are some donations that do not require GSA's approval?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are some donations... PROPERTY 37-DONATION OF SURPLUS PERSONAL PROPERTY Holding Agency § 102-37.125 What are some donations that do not require GSA's approval? (a) Some donations of surplus property that do not require GSA's...

  8. 41 CFR 302-3.419 - For what property will my agency pay property management services?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false For what property will my agency pay property management services? 302-3.419 Section 302-3.419 Public Contracts and Property....419 For what property will my agency pay property management services? Your agency will only pay for...

  9. 41 CFR 101-42.404 - Special requirements for the sale of hazardous materials.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Special requirements for... Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS UTILIZATION... special storage and handling. It is the responsibility of the holding agency to properly store hazardous...

  10. Determining the optimal mix of federal and contract fire crews: a case study from the Pacific Northwest.

    Science.gov (United States)

    Geoffrey H. Donovan

    2006-01-01

    Federal land management agencies in the United States are increasingly relying on contract crews as opposed to agency fire crews. Despite this increasing reliance on contractors, there have been no studies to determine what the optimal mix of contract and agency fire crews should be. A mathematical model is presented to address this question and is applied to a case...

  11. 48 CFR 32.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.114 Unusual contract financing. Any contract financing arrangement that deviates from this part is unusual contract financing...

  12. 76 FR 63581 - Certainty of Terms of Service Contracts and NVOCC Service Arrangements

    Science.gov (United States)

    2011-10-13

    ... Terms of Service Contracts and NVOCC Service Arrangements AGENCY: Federal Maritime Commission. ACTION... regarding certainty of terms of service contracts and non-vessel- operating common carrier service... flexibility if they decide to use long-term contracts that adjust based on a freight rate index that reflects...

  13. Civilian Agency Industry Working Group EVM World Update

    Science.gov (United States)

    Kerby, Jerald

    2013-01-01

    Objectives include: Promote the use of standards ]based, objective, and quantitative systems for managing projects and programs in the federal government. Understand how civilian agencies in general, manage their projects and programs. Project management survey expected to go out soon to civilian agencies. Describe how EVM and other best practices can be applied by the government to better manage its project and programs irrespective of whether work is contracted out or the types of contracts employed. Develop model policies aimed at project and program managers that are transportable across the government.

  14. 48 CFR 39.107 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer...

  15. 41 CFR 101-39.101-1 - Agency cooperation.

    Science.gov (United States)

    2010-07-01

    ...-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.1-Establishment, Modification, and Discontinuance of Interagency Fleet... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Agency cooperation. 101-39.101-1 Section 101-39.101-1 Public Contracts and Property Management Federal Property Management...

  16. Performance-based contracting for maintaining transportation assets with emphasis on bridges

    Directory of Open Access Journals (Sweden)

    Alsharqawi Mohammed

    2017-01-01

    Full Text Available With a large number of aging transportation infrastructure assets in North America and the growing problem of deterioration across the globe, managing these assets have been the subject of ongoing research. There is an overwhelming amount of maintenance and rehabilitation works to be done and selecting a suitable maintenance, repair or replacement (MRR strategy is one of the most challenging tasks for decision makers. Limited budget and resources are even making the decision making process more challenging. Maintaining infrastructure to the highest possible condition while investing the minimal amount of money has promoted innovative contracting approaches. Transportation agencies have increased private sector involvement through long term performance-based maintenance contracts or what is called Performance-Based Contracting. PBC is a type of contract that pays a contractor based on the results achieved, not on the methods for performing the maintenance work. By looking into the literature, it is observed that agencies are expanding the amount of contracting they do in order to maintain and achieve a better standard of infrastructure facilities. Therefore, the objective of this paper is to study and review performance-based contracting for transportation infrastructure with emphasis on bridge assets.

  17. 76 FR 72452 - International Mail Contract

    Science.gov (United States)

    2011-11-23

    ... POSTAL REGULATORY COMMISSION [Docket No. R2012-4; Order No. 981] International Mail Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recently-filed Postal Service request to enter into an additional bilateral agreement with HongKong Post Group...

  18. 41 CFR 301-73.201 - What method of payment may be used for contract passenger transportation service?

    Science.gov (United States)

    2010-07-01

    ... Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES AGENCY RESPONSIBILITIES 73-TRAVEL PROGRAMS Contract Passenger Transportation Services § 301-73.201 What... contractor-issued travel charge card(s), or your agency centrally billed or other established account, or a...

  19. Employee contract issues for dermatologists.

    Science.gov (United States)

    Brown, Christopher E; Indest, George F

    2013-12-01

    Employees and employers routinely face negotiating and preparing physician employment contracts. It is important for both sides to know and understand the basic information on what a comprehensive employment contract for a dermatologist should contain. There are various employment contract provisions from both the employee's perspective and the employer's perspective that must be considered when preparing physician employment contracts. This article provides basic advice and recommendations on requirements that should be included in such contracts. It suggests legal pitfalls that can be avoided through various contract clauses.

  20. 48 CFR 833.215 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 833.215 Section 833.215 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 833.215 Contract clause. The contracting...

  1. 48 CFR 947.7002 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 947.7002 Section 947.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT TRANSPORTATION Foreign Travel 947.7002 Contract clause. When foreign travel may be required under the contract...

  2. 48 CFR 432.412 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clause. 432.412 Section 432.412 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Advance Payments for Non-Commercial Items 432.412 Contract clause. The decision...

  3. Exploring the characteristics of nursing agencies in South Africa

    Directory of Open Access Journals (Sweden)

    Omolola I. Olojede

    2015-05-01

    Full Text Available Background: Nursing agencies are temporary employment service providers or labour brokers that supply nurses to health establishments. Objective: This study was conducted to determine the characteristics of nursing agencies and their relationship with clients in the health sector. Methods: During 2011, a cross-sectional national survey of 106 nursing agencies was conducted. After obtaining informed consent, telephone interviews were conducted with a representative of the selected nursing agency using a pretested structured questionnaire. Questions focused on the following: ownership, date of establishment, province of operation, distribution of clients across private and public health facilities; existence of a code of conduct; nature of the contractual relationship between nursing agencies and their clients, and numbers and cadres of nurses contracted. The survey data were analysed using STATA® 12. Results: Fifty-two nursing agencies participated in the survey, representing a 49% response rate. The study found that 32 nursing agencies (62% served private-sector clients only, which included private hospitals, homes for elderly people, patients in private homes, and private industry/company clinics, and only four (8% of the agencies served the public sector only. Twenty-seven percent of nursing agencies provided services to homes for elderly individuals. Nursing agencies were more likely to have contracts with private-sector clients (84% than with public-sector clients (16% (p = 0.04. Although 98% of nursing agencies reported that they had a code of conduct, the proportion was higher for private-sector clients (73% compared to public-sector clients (27%. In terms of quality checks and monitoring, 81% of agencies agreed with a statement that they checked the nursing council registration of nurses, 82% agreed with a statement that they requested certified copies of a nurse's qualifications. Only 21% indicated that they conducted reference checks

  4. 48 CFR 432.113 - Customary contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 432.113 Section 432.113 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 432.113 Customary contract financing. The contracting officer may determine the necessity for customary contract financing. The...

  5. Management of transport and handling contracts

    CERN Document Server

    Rühl, I

    2004-01-01

    This paper shall outline the content, application and management strategies for the various contracts related to transport and handling activities. In total, the two sections Logistics and Handling Maintenance are in charge of 27 (!) contracts ranging from small supply contracts to big industrial support contracts. The activities as well as the contracts can generally be divided into four main topics "Vehicle Fleet Management"; "Supply, Installation and Commissioning of Lifting and Hoisting Equipment"; "Equipment Maintenance" and "Industrial Support for Transport and Handling". Each activity and contract requires different approaches and permanent adaptation to the often changing CERN's requirements. In particular, the management and the difficulties experienced with the contracts E072 "Maintenance of lifting and hoisting equipment", F420 "Supply of seven overhead traveling cranes for LHC" and S090/S103 "Industrial support for transport and handling" will be explained in detail.

  6. 78 FR 7858 - Publication of Fiscal Year 2012 Service Contract Inventory

    Science.gov (United States)

    2013-02-04

    ... DEPARTMENT OF THE TREASURY Publication of Fiscal Year 2012 Service Contract Inventory AGENCY: Departmental Offices, Treasury. ACTION: Notice of publication of Fiscal Year 2012 Service Contract Inventory. SUMMARY: The Department of the Treasury will make available to the public at http://www.treasury.gov/about...

  7. 48 CFR 904.7201 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 904.7201... MATTERS Public Affairs 904.7201 Contract clause. The contracting officer shall insert the clause at 952.204-75, Public Affairs, in solicitations and contracts that require the contractor to release...

  8. 48 CFR 1646.201 - Contract Quality Policy.

    Science.gov (United States)

    2010-10-01

    ... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality... ensure that services acquired under the FEHB contract conform to the contract's quality and audit... assurance program required by the contract and will acknowledge in writing whether or not the system is...

  9. 75 FR 31699 - Indian Self-Determination Act Contracts and Annual Funding Agreements-Appeal Procedures

    Science.gov (United States)

    2010-06-04

    ... Indian Self-Determination Act Contracts and Annual Funding Agreements--Appeal Procedures AGENCIES: Bureau... Contract Disputes Act, 41 U.S.C. 601-613. Effective January 6, 2007, Congress abolished the Interior Board... technical amendments to their joint regulations governing contracts and annual funding agreements under the...

  10. 76 FR 52952 - Student Services Contract EP-11-D-000403 Yin Gu; Transfer of Data

    Science.gov (United States)

    2011-08-24

    ... will enable Student Services Contract EP-11-D-000403 Yin Gu to fulfill the obligations of the contract... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2011-0038; FRL-8884-1] Student Services Contract EP-11... Business Information (CBI) by the submitter, will be transferred to Student Services Contract EP- 11-D...

  11. 48 CFR 852.222-70 - Contract Work Hours and Safety Standards Act-nursing home care contract supplement.

    Science.gov (United States)

    2010-10-01

    ... Safety Standards Act-nursing home care contract supplement. 852.222-70 Section 852.222-70 Federal...—nursing home care contract supplement. As prescribed in 822.305, for nursing home care requirements, insert the following clause: Contract Work Hours and Safety Standards Act—Nursing Home Care Contract...

  12. 48 CFR 53.111 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contract clause. 53.111... AND FORMS FORMS General 53.111 Contract clause. Contracting officers shall insert the clause at 52.253-1, Computer Generated Forms, in solicitations and contracts that require the contractor to submit...

  13. 48 CFR 432.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 432.114 Unusual contract financing. The HCA is authorized to approve unusual contract financing. The signed determination and finding...

  14. 48 CFR 1332.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 1332.114 Unusual contract financing. The designee authorized to approve unusual contract financing arrangements is set forth in CAM...

  15. Contracting for Public Services

    DEFF Research Database (Denmark)

    Greve, Carsten

    strategic purchasing understanding markets communicating the contracting decision designing and drafting the contract the role of the consumer the regulation of service provision Illustrated throughout with practitioner case-studies from a range of OECD countries, this book presents an important new......Insightful and comprehensive and covering new subjects like globalization and IT, this text, international in its approach, provides a thorough introduction to the key phases of the contracting process and the skills required by managers in its implementation. These include: policy for contracting...

  16. 48 CFR 5.504 - Use of advertising agencies.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Use of advertising... ACQUISITION PLANNING PUBLICIZING CONTRACT ACTIONS Paid Advertisements 5.504 Use of advertising agencies. (a) General. Basic ordering agreements may be placed with advertising agencies for assistance in producing and...

  17. 75 FR 50950 - Federal Speculative Position Limits for Referenced Energy Contracts and Associated Regulations

    Science.gov (United States)

    2010-08-18

    ..., section 4a(a) of the Act authorized the Commission to establish position limits for contracts traded on or... Position Limits for Referenced Energy Contracts and Associated Regulations AGENCY: Commodity Futures... and option contracts based on a limited set of exempt commodities,\\1\\ namely certain energy...

  18. 48 CFR 32.007 - Contract financing payments.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract financing... GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING 32.007 Contract financing payments. (a)(1) Unless... section, the due date for making contract financing payments by the designated payment office is the 30th...

  19. 75 FR 16821 - Housing Finance Agency Risk-Sharing Program

    Science.gov (United States)

    2010-04-02

    ...The proposed information collection requirement described below has been submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal. Section 542(c) of the Risk Sharing Program authorizes qualified Housing Finance Agencies (HFAs) to underwrite and process loans. HUD provides full mortgage insurance on affordable multifamily housing project processed by HFAs under this program. Qualified HFAs are vested with the maximum amount of processing responsibilities. By entering into Risk-Sharing Agreement with HUD, HFAs contract to reimburse HUD for a portion of the loss from any defaults that occur while HUD insurance is in force.

  20. 41 CFR 101-1.107 - Agency consultation regarding FPMR.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Agency consultation regarding FPMR. 101-1.107 Section 101-1.107 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.1-Regulation...

  1. 77 FR 65169 - Extension of Certain Timber Sale Contracts; Finding of Substantial Overriding Public Interest

    Science.gov (United States)

    2012-10-25

    ... that are in breach, or (6) contracts when the purchaser's processing facility has not operated during... DEPARTMENT OF AGRICULTURE Forest Service Extension of Certain Timber Sale Contracts; Finding of Substantial Overriding Public Interest AGENCY: Forest Service, USDA. ACTION: Notice of contract extensions...

  2. 48 CFR 32.113 - Customary contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 32.113 Section 32.113 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.113 Customary contract financing. The solicitation must specify the customary contract financing offerors may...

  3. Safety and health education and training of contract workers in nuclear power plants

    International Nuclear Information System (INIS)

    Matsumoto, Akikuni; Hara, Hisayuki; Nawata, Kazumitsu

    2008-01-01

    Nuclear power plants have used many contract workers. Their safety and health conditions are very important in Japan. Several amendments, which deregulate temporary personnel service and employment agency markets, have been done in recent years. The number of contract and temporary help agency workers have been rapidly increasing especially since the 1990s. As a result, ensuring the level of safety and health education and training of workers becomes a serious problem. This paper examines the possibility that the level of safety training of the contract workers is less than that of the direct-hire employees in nuclear power plants. We show that (1) the use of contract workers could be less efficient for ensuring the level of safety training, and (2) nuclear power plants still use contract workers in some situations in spite of the loss of efficiency. We also study legislations and past cases relating to nuclear power generation. We find that there are some structural problems that might make the contract workers less trained. (author)

  4. 48 CFR 32.103 - Progress payments under construction contracts.

    Science.gov (United States)

    2010-10-01

    ... REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.103... to be withheld shall be made by the contracting officer on a case-by-case basis. Such decisions will... other factors. Upon completion of all contract requirements, retained amounts shall be paid promptly...

  5. 78 FR 14415 - Publication of Fiscal Year 2012 Service Contract Inventory Analysis

    Science.gov (United States)

    2013-03-05

    ... DEPARTMENT OF THE TREASURY Publication of Fiscal Year 2012 Service Contract Inventory Analysis AGENCY: Departmental Offices, Treasury. ACTION: Notice of publication of Fiscal Year 2012 Service Contract Inventory: Analysis of the FY 2012 Inventory and Planned Analysis of 2013. SUMMARY: The Department...

  6. 48 CFR 32.104 - Providing contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 32.104 Section 32.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.104 Providing contract financing. (a) Prudent contract financing can be a useful working tool in Government...

  7. Analysis of Developed Country's Export Contract and Contract Risk and Development of Sample Contract and Guide

    International Nuclear Information System (INIS)

    Lee, D. S.; Oh, K. B.; Chung, W. S.; Lee, K. S.; Yun, S. W.; Lee, J. H.; Lee, B. W.; Kim, H. J.; Yang, M. H.

    2008-10-01

    This paper aimed at developing legal support for the non nuclear power plant industry's export. This study aids establishing government policy and promoting export of non nuclear power plant industry. This paper treated analysis of contractual risk and caution before entering into contract. To promote continuing export result, governmental and legal aids and guide will be required continuously. This study showed risks related with export contract and explained export control acts and procedures

  8. THE REQUIRED FORM OF A PRE-CONTRACT ALLOWING FOR A COURT JUDGMENT TO STAND FOR A SALE CONTRACT

    Directory of Open Access Journals (Sweden)

    Delia Narcisa THEOHARI

    2017-05-01

    Full Text Available A bilateral promissory agreement for sale needs no notarial deed to constitute, in case of non-fulfillment, grounds for the delivery of a judgment which takes the place of a sale contract, a private agreement being sufficient whereas the judgment itself represents the sale contract and both the substantive and formal conditions are therefore satisfied.

  9. 77 FR 67584 - Air Carrier Contract Maintenance Requirements

    Science.gov (United States)

    2012-11-13

    ... many, including air carriers lowering costs by employing fewer maintenance personnel and reducing their... make accurate risk assessments. B. History In May 1996, employees of SabreTech, a contract maintenance...-certificated repair facilities, and the air carriers' outsourcing of maintenance. In each of those reports...

  10. 48 CFR 36.214 - Special procedures for price negotiation in construction contracting.

    Science.gov (United States)

    2010-10-01

    ... price negotiation in construction contracting. 36.214 Section 36.214 Federal Acquisition Regulations... negotiation in construction contracting. (a) Agencies shall follow the policies and procedures in part 15 when... scope of the work. If negotiations reveal errors in the Government estimate, the estimate shall be...

  11. Are flexible contracts bad for workers? Evidence from job satisfaction data

    OpenAIRE

    Green, C; Heywood, J S

    2007-01-01

    If workers can choose between permanent and flexible contracts, compensating wage differentials should arise to equalize on-the-job utility in the two types of contracts. Estimating job satisfaction using the British Household Panel Survey shows that agency and casual contracts are associated with routinely lower satisfaction. This results because the low job satisfaction associated with less job security is not offset by higher compensation or other job characteristics. Job security is suffi...

  12. 41 CFR 102-192.155 - What should our agency-wide mail management policy statement cover?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What should our agency-wide mail management policy statement cover? 102-192.155 Section 102-192.155 Public Contracts and... REGULATION ADMINISTRATIVE PROGRAMS 192-MAIL MANAGEMENT Other Agency Responsibilities § 102-192.155 What...

  13. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  14. 42 CFR 414.422 - Terms of contracts.

    Science.gov (United States)

    2010-10-01

    ...)(i) of the Act, if applicable to such subcontractor. (g) Breach of contract. (1) Any deviation from... requirements, constitutes a breach of contract. (2) In the event a contract supplier breaches its contract, CMS... 42 Public Health 3 2010-10-01 2010-10-01 false Terms of contracts. 414.422 Section 414.422 Public...

  15. Toward a General Theory of Commitment, Renegotiation and Contract Incompleteness : (II) Commitment Problem and Optimal Incentive Schemes in Agency with Bilateral Moral Hazard

    OpenAIRE

    Suzuki, Yutaka

    1998-01-01

    This paper investigates the characteristics of the optimal incentive contracts when the principal is also a productive agent. In this bilateral moral hazard framework, the two requirements should be satisfied in designing an incentive scheme. One is the agent's incentive provision and the other is the principal's incentive provision. Because of the trade off between these two incentive provisions, only the second best is obtainable if the incentive contract should be based only on the total o...

  16. Incomplete contracting theory in empirical accounting research

    NARCIS (Netherlands)

    van Lent, L.A.G.M.

    1999-01-01

    In three essays, the implications of the costly contracting approach in accounting are investigated. First, the consequences of changing the set of acceptable accounting techniques in the banking and insurance industry are examined. The regulations imposed by a government agency alter the

  17. Comprehensive Maintenance of CCTV System at Bangi Complex, Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Hasif Mohamad; Mohd Hazri Mohd Salleh; Mohd Ghazali Bachol

    2015-01-01

    Control of Closed Circuit Camera (CCTV) is a security monitoring system used to monitor an area using the method of monitoring of video. The use of CCTV allows the operator to monitor the area that has been equipped with CCTV cameras from a control center is provided. CCTV system has proved effective in terms of facilitating the task of monitoring, save costs, and improves safety. Recognizing the high requirements to ensure the system is running without interruption, the PIA has implemented a comprehensive maintenance program on all CCTV complex is located in Bangi, Malaysia Nuclear Agency at a cost of RM 95,000.00 for the year. This paper will report on the implementation of a comprehensive maintenance contract CCTV and discuss the problems faced during the contract period. (author)

  18. Comprehensive Maintenance of CCTV System at Bangi Complex Malaysian Nuclear Agency

    International Nuclear Information System (INIS)

    Hasif Mohamad; Mohd Hazri Mohd Salleh; Mohd Ghazali Bachol

    2015-01-01

    Control of Closed Circuit Camera (CCTV) is a security monitoring system used to monitor an area using the method of monitoring of video. The use of CCTV allows the operator to monitor the area that has been equipped with CCTV cameras from a control center is provided. CCTV system has proved effective in terms of facilitating the task of monitoring, save costs, and improves safety. Recognizing the high requirements to ensure the system is running without interruption, the PIA has implemented a comprehensive maintenance program on all CCTV complex is located in Bangi, Malaysia Nuclear Agency at a cost of RM 95,000.00 for the year. This paper will report on the implementation of a comprehensive maintenance contract CCTV and discuss the problems faced during the contract period. (author)

  19. 48 CFR 632.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Unusual contract financing. 632.114 Section 632.114 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 632.114 Unusual contract financing. The...

  20. Impact of hazardous waste risks and liabilities on the contracting process

    International Nuclear Information System (INIS)

    Gleason, G.L.

    1991-01-01

    Hazardous waste risks include the following: (1) An emerging environmental cleanup industry that differs significantly from traditional engineering; (2) The inability to predict and control the subsurface environment; (3) The implementation of new and often untested technologies; (4) The statutory imposition of strict, joint and several, as well as retroactive, liability; (5) The lack of insurance and other risk-transfer mechanisms to protect against losses; (6) Costly and time consuming litigation to determine liability; and (7) Others. The liabilities associated with the risks inherent in hazardous waste cleanup directly impact hazardous waste contracting. Contract negotiations become onerous during discussions of liability, indemnification, and issues surrounding scope of work and other clauses. Other impacts include (1) Defensive engineering; (2) Lack of incentive to implement innovative technologies; (3) Increased costs to cover risks. Required client indemnification is a necessary and responsible risks management practice, regardless of whether the client is a federal or private client. Federal government indemnification authorities, as well as private contract indemnification mechanisms, will be explained and analyzed. Conflict of interest concerns are also of critical importance in the hazardous waste market, particularly due to concerns over the complexity of the litigation surrounding hazardous waste sites and the need to ensure unbiased results. Other examples of hazardous waste risk management impacts on contracting in the following market sectors will also be provided: (1) U.S. Environmental Protection Agency; (2) Department of Defense; (3) Department of Energy; and (4) Private sector contracts

  1. 76 FR 41056 - Amendment to Rule Filing Requirements for Dually-Registered Clearing Agencies

    Science.gov (United States)

    2011-07-13

    ... potential legal uncertainty and market disruption caused by delays that could result from the requirement... and market disruptions. Specifically, one clearing agency subject to the Deemed Registered Provision... Changes that relate primarily to its futures clearing operations to the routine Commission approval...

  2. 48 CFR 2432.908 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... Section 2432.908 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Prompt Payment 2432.908 Contract clauses. (c)(1) The... other than the submission of an invoice or voucher, e.g., directly from proceeds of property sales. [71...

  3. Auditability In The U.S. Navy: A Knowledge Assessment Of The Contracting Workforce

    Science.gov (United States)

    2016-12-01

    contracts, purchasing, management , marketing , quantitative methods or organization and management , a Baccalaureate degree, and one year of contracting...and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2...maximum 200 words) The Department of Defense (DOD) has some problems in its contracting workforce that make the department susceptible to

  4. European contract law and the capabilities approach: on distributive responsibility for contract law

    NARCIS (Netherlands)

    Tjon Soei Len, L.; Weidtmann, N.; Hölzchen, Y.M.; Hawa, B.

    2012-01-01

    This paper argues that the normative requirements of Nussbaum’s capabilities approach extend to contract law (and private law more broadly). Contract law is part of a society’s basic structure, i.e. the responsibility bearing structure that is to secure and enhance individuals’ basic capabilities.

  5. 41 CFR 102-75.145 - Is GSA required to review each report of excess?

    Science.gov (United States)

    2010-07-01

    ... landholding agency, in writing, whether the report is acceptable or other information is needed within 15... review each report of excess? 102-75.145 Section 102-75.145 Public Contracts and Property Management... Is GSA required to review each report of excess? Yes, GSA must review each report of excess to...

  6. 48 CFR 432.007 - Contract financing payments.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING 432.007 Contract financing payments. The HCA may prescribe, on a case-by-case basis, a shorter period for financing payments. [61 FR 53646, Oct. 15, 1996. Redesignated...

  7. Food and drink serving contract

    Directory of Open Access Journals (Sweden)

    Veselinović Janko

    2012-01-01

    Full Text Available Food and drink catering service is almost as old as the civilization itself. Even though this vocation is a part of the catering activity, Serbian law does not foresee this contract section as personalized. Key legal sources for this kind of contract are business customs. Food and drink serving contract is a mixed-type contract and its legal nature is very interesting due to its complexity. Specific for this contract is the fact that it is not an ordinary service, but also an activity which requires a degree of culinary skills, knowledge of customs of other nations, as well as other skills. The very category of a good professional in business economy / hospitality industry is very dynamic, as it needs to be evaluated according to all given circumstances, which may be rather unpredictable. By considering the legal nature, but also the rights and obligations of the contracting parties, we tried to point to the questions that require a special attention. Legal sources that indirectly refer to food and drink serving contracts were taken into account. Apart from the Law on Obligatory Relations, we also considered here the Law on Tourism also pointing to the comparative law and jurisprudence.

  8. 29 CFR 4.110 - What contracts are covered.

    Science.gov (United States)

    2010-07-01

    ...'Hara Service Contract Act Covered Contracts Generally § 4.110 What contracts are covered. The Act... mean that the contract is not within the coverage of the Act. The amount of the contract is not determinative of the Act's coverage, although the requirements are different for contracts in excess of $2,500...

  9. 48 CFR 32.908 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ..., Prompt Payment for Fixed-Price Architect-Engineer Contracts, in solicitations and contracts that contain the clause at 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts. (1) As authorized in... specify a period longer than 7 days for constructive acceptance or constructive approval, if required to...

  10. The Historically Black College as Social Contract, Social Capital, and Social Equalizer.

    Science.gov (United States)

    Brown, M. Christopher, II; Davis, James Earl

    2001-01-01

    Historically black colleges and universities (HBCUs) enjoy a unique social contract in the national history, acting as social agencies for society by providing equal educational opportunity and attainment for all students. This social contract brokered between the nation and African Americans is realized through social capital or distribution and…

  11. 48 CFR 2832.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Unusual contract financing... Contracting Requirements CONTRACT FINANCING Non-Commercial Item Purchase Financing 2832.114 Unusual contract financing. The HCA, or designee at a level not lower than the BPC, is the official authorized to approve...

  12. 48 CFR 970.0808-3 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0808... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Required sources of supplies and services 970.0808-3 Contract clause. The contracting officer shall insert the clause at 970.5208-1, Printing, in all...

  13. 48 CFR 32.501-3 - Contract price.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract price. 32.501-3... REQUIREMENTS CONTRACT FINANCING Progress Payments Based on Costs 32.501-3 Contract price. (a) For the purpose of making progress payments and determining the limitation on progress payments, the contract price...

  14. 48 CFR 3.1004 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... applicable posters; and (ii) Insert the website link(s) or other contact information for obtaining the agency... Contract clauses. (a) Insert the clause at FAR 52.203-13, Contractor Code of Business Ethics and Conduct... or will be performed entirely outside the United States, insert the clause at FAR 52.203-14, Display...

  15. 78 FR 72109 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2013-12-02

    ... continues negotiations on an operations, maintenance and replacement transfer contract with the Navajo... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... individual contract actions may be published in the Federal Register and in newspapers of general circulation...

  16. 78 FR 46365 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2013-07-31

    ..., Colorado, New Mexico, Texas, Utah, and Wyoming: Contracts for extraordinary maintenance and replacement... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... individual contract actions may be published in the Federal Register and in newspapers of general circulation...

  17. 78 FR 72111 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2013-12-02

    ...: Reclamation continues negotiations on an operations, maintenance and replacement transfer contract with the... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... individual contract actions may be published in the Federal Register and in newspapers of general circulation...

  18. 48 CFR 32.105 - Uses of contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Uses of contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.105 Uses of contract financing. (a) Contract financing methods covered in this part are intended to be self-liquidating through...

  19. 41 CFR 102-80.30 - What are Federal agencies' responsibilities concerning lead?

    Science.gov (United States)

    2010-07-01

    ... agencies' responsibilities concerning lead? 102-80.30 Section 102-80.30 Public Contracts and Property... PROPERTY 80-SAFETY AND ENVIRONMENTAL MANAGEMENT Safety and Environmental Management Lead § 102-80.30 What are Federal agencies' responsibilities concerning lead? Federal agencies have the following...

  20. Super Energy Savings Performance Contracts: Federal Energy Management Program (FEMP) Program Overview (revision)

    International Nuclear Information System (INIS)

    Pitchford, P.

    2001-01-01

    This four-page publication describes the U.S. Department of Energy's (DOE's) streamlined energy savings performance contracting, or ''Super ESPC,'' process, which is managed by DOE's Federal Energy Management Program (FEMP). Under a Super ESPC, a qualifying energy service company (ESCO) from the private sector pays for energy efficiency improvements or advanced renewable energy technologies (e.g., photovoltaic systems, wind turbines, or geothermal heat pumps, among others) for a facility of a government agency. The ESCO is then repaid over time from the agency's resulting energy cost savings. Delivery orders under these contracts specify the level of performance (energy savings) and the repayment schedule; the contract term can be up to 25 years, although many Super ESPCs are for about 10 years or less

  1. 77 FR 4053 - Agency Information Collection Activities: Post-Award Contract Information

    Science.gov (United States)

    2012-01-26

    ... technological collection techniques or other forms of information technology, e.g., permitting electronic... Acquisition Regulation (FAR) (48 CFR chapter 1). Source selection documentation, Government estimate of... information that is collected are identified in pertinent sections of FAR 4.803, Contents of contract files...

  2. Engineering and Statistical Research Institute contract reports to May, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Thuns, A; Morrison, B A

    1983-06-01

    The purpose of this publication is to provide information on certain Canadian agricultural research contracts which are completed, published and available for loan. These contracts reports are documentation of research contracted out to non-federal government agencies, universities or individuals. Reports on contracts under the control of the Engineering and Statistical Research Institute are written by the contractor, and are reviewed by the scientific authority. Some reports date back to 1973, when the initial contracting program began. The first program was called DREAM (Development, Research, and Evaluation in Agricultural Mechanization). In 1977-78, projects under the Energy in Agriculture program were added. This was the beginning of the AERD (Agricultural Enginering Research and Development) program. In 1981, energy research had expanded and came under a separate progam called ERDAF (Energy Research and Development in Agriculture and Food). The remaining contract work stayed with the AERD program. This publication lists only contracts completed having final reports, and available contract reports with separate listings sorted by contract file number, title, author or subject.

  3. 75 FR 15453 - Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract

    Science.gov (United States)

    2010-03-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Proposed Repayment Contract. SUMMARY: The Bureau of Reclamation will be initiating negotiations with the...

  4. The contract - introduction

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    The contract is the last and final step of project planning and the first step of project implementation. The contract has to specify in detail and to the point, as concisely as possible, the complete scope of supplies and work, define all technical particulars and requirements, put forward the conditions of legal, regulatory, administrative and financial procedure, prepare for operating and maintenance instructions to be issued after commissioning. In short, the contract is expected to be a reliable instrument during the manufacturing and construction period as well as a guide-book to assist the owner afterwards in the operation and maintenance of the plant. (orig./FW) [de

  5. 48 CFR 42.302 - Contract administration functions.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Office Functions 42... officer. (5) Negotiate forward pricing rate agreements (see 15.407-3). (6) Negotiate advance agreements..., packaging, and packing. (38) Ensure contractor compliance with contractual quality assurance requirements...

  6. Analisys of IT outsourcing contracts at the TCU (Federal Court of Accounts and of the legislation that governs these contracts in the Brazilian Federal Public administration

    Directory of Open Access Journals (Sweden)

    Graziela Ferreira Guarda

    2015-09-01

    Full Text Available Information technology (IT outsourcing has for a long time been a major trend in business and government. Accountability of IT outsourcing contracts in the public administration is recognized as an important factor contributing to government transparency and public services quality, given the legislation governing these contracts and the amount of related expenditures. Considering the trend towards open government data publishing, including data on outsourcing contracts, there is an interesting opportunity for citizens to participate in the open auditing of these contracts as a means to assess the good application of public resources. In this study we explore this possibility by analyzing open data published by the Brazilian Federal Court of Accounts (TCU is its acronym in Portuguese, an interesting case since this agency has a paramount role in auditing the whole Brazilian Federal Public Administration. To this end, we gathered open data from the TCU regarding all outsourced IT services contracts maintained by the agency during the years 2000-2013. This data is analyzed to verify, from an external point of view, the related duration and values, identifying diferences between the predicted and actual amounts spent and evaluating the administration of such contracts regarding legislation. This analysis is based on a detailed survey of the relevant legislation as well as the verification of original contract terms and their addendums. As a result, we observed substantial differences in the amount spent on execution with respect to those predicted in the original contracts. Also, we identified the utilization of special justifications prescribed by law to sustain the extension of some contracts. Given these results, it is possible that IT outsourcing is not necessarily proved to be the best solution for the public sector problems regarding the lack of skilled personnel, which implies the need to assess the cost-benefit of maintaining these

  7. Utility Energy Services Contracts: Enabling Documents, May 2009 (Book)

    Energy Technology Data Exchange (ETDEWEB)

    2009-05-01

    Enabling Documents, delivered by the U.S. Department of Energy's Federal Energy Management Program (FEMP) to provide materials that clarify the authority for federal agencies to enter into utility energy services contracts (UESCs).

  8. 24 CFR 983.202 - Purpose of HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Purpose of HAP contract. 983.202... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.202 Purpose of HAP contract. (a) Requirement. The PHA must enter into a HAP contract with the owner. The HAP contract must be...

  9. Small Business. More Transparency Needed in Prime Contract Goal Program

    National Research Council Canada - National Science Library

    2001-01-01

    ...)-a unit of the General Services Administration-collects data on all federal contract actions and calculates the government's annual small business achievements based on procurement information received from the agencies...

  10. 78 FR 10174 - Public Availability of General Services Administration FY 2012 Service Contract Inventory

    Science.gov (United States)

    2013-02-13

    ... GENERAL SERVICES ADMINISTRATION [Notice-MV-2013-02; Docket No. 2013-0002; Sequence 3] Public Availability of General Services Administration FY 2012 Service Contract Inventory AGENCY: General Services Administration (GSA). ACTION: Notice of Public Availability of FY 2012 Service Contract Inventories. SUMMARY: In...

  11. 76 FR 16041 - Agency Information Collection (VAAR Sections 809.106-1, 809.504(d), and Clause 852.209-70) Under...

    Science.gov (United States)

    2011-03-22

    ... Management and Budget (OMB) for review and comment. The PRA submission describes the nature of the... to award a contract to a firm that might involve or result in a conflict of interest. VA uses the... conflict. An agency may not conduct or sponsor, and a person is not required to respond to a collection of...

  12. 48 CFR 32.203 - Determining contract financing terms.

    Science.gov (United States)

    2010-10-01

    ... financing terms. 32.203 Section 32.203 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Commercial Item Purchase Financing 32.203 Determining contract financing terms. When the criteria in 32.202-1(b) are met, the contracting officer may either...

  13. 41 CFR 301-13.3 - What additional travel expenses may my agency pay under this part?

    Science.gov (United States)

    2010-07-01

    ... 13-TRAVEL OF AN EMPLOYEE WITH SPECIAL NEEDS § 301-13.3 What additional travel expenses may my agency... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What additional travel expenses may my agency pay under this part? 301-13.3 Section 301-13.3 Public Contracts and Property...

  14. 48 CFR 22.404-12 - Labor standards for contracts containing construction requirements and option provisions that...

    Science.gov (United States)

    2010-10-01

    ... contracting officer may include in the contract a separately specified pricing method that permits an... wage determination into the contract, and must apply the specific pricing method to calculate the contract price adjustment. An example of a contract pricing method that the contracting officer might...

  15. State-Andra performance contract 2017-2021

    International Nuclear Information System (INIS)

    2017-12-01

    After a brief presentation of the ANDRA and of its missions, of challenges faced by this agency in the elaboration of the performance contract in addressing waste issues, the role of time and life cycle for storages, and the collaboration with territories, this publication presents ANDRA's objectives for the period 2017-2021 according to six main strategic axes: to conduct a transformation of the agency, to set the environment and dialogue with society at the core of its action, to make Cigeo a collective success, to confirm the ANDRA's industrial excellence and to contribute the one of the whole sector, to develop, capitalise and transmit knowledge, to develop the public agency model as a reference for a safe waste management with a good and reasonable taking of challenges into account

  16. 48 CFR 828.106-72 - Contract provision.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract provision. 828... GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds and Other Financial Protections 828.106-72 Contract provision. Insert 852.228-72, Assisting Service-Disabled Veteran-Owned and Veteran-Owned Small...

  17. 75 FR 65881 - Ownership Limitations and Governance Requirements for Security-Based Swap Clearing Agencies...

    Science.gov (United States)

    2010-10-26

    ... it determines they are necessary or appropriate to improve the governance of, or to mitigate systemic... Part IV Securities and Exchange Commission 17 CFR Part 242 Ownership Limitations and Governance... Ownership Limitations and Governance Requirements for Security- Based Swap Clearing Agencies, Security-Based...

  18. Review of the research contract programs in the field of nuclear science and technology (1959-1979)

    Energy Technology Data Exchange (ETDEWEB)

    Bonoan, L S; Marasigan, C J; Relunia, E D [Philippine Atomic Energy Commission, Diliman, Quezon City

    1982-01-01

    This paper presents the 20 year span of cooperative services in the form of research contracts availed of by the country with the International Atomic Energy Agency (IAEA). All research contract grants are placed under the direct supervision of educational institutions, industrial laboratories, research centers and other institutions on areas of direct interest of the Agency's work. These areas are generally in the field of: life sciences with emphasis on medical and agricultural applications, radiation biology; nuclear safety; environmental protection; physical sciences such as physics and chemistry; engineering and technology, with special emphasis on nuclear power. Tables and figures graphically present research contracts grants and field classification.

  19. 41 CFR 101-1.108 - Agency implementation and supplementation of FPMR.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Agency implementation and supplementation of FPMR. 101-1.108 Section 101-1.108 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.1-Regulation...

  20. 75 FR 13381 - Nondisplacement of Qualified Workers Under Service Contracts

    Science.gov (United States)

    2010-03-19

    ... contractor and its subcontractors shall, except as otherwise provided by the clause, in good faith offer... English and translated versions available in a poster format to contracting agencies via the Internet, in...

  1. 29 CFR 4.142 - Contracts in an indefinite amount.

    Science.gov (United States)

    2010-07-01

    ... McNamara-O'Hara Service Contract Act Determining Amount of Contract § 4.142 Contracts in an indefinite amount. (a) Every contract subject to this Act which is indefinite in amount is required to contain the....), a case arising under the Walsh-Healey Public Contracts Act. Such a contract, which may be in the...

  2. Periodic review in natural resource contracts | Mandelbaum ...

    African Journals Online (AJOL)

    Periodic contract review mechanisms, which are provisions in contracts that formally require parties to meet at particular intervals to review the terms of the contract, are mechanisms that may facilitate the process of negotiating contractual changes to accommodate changing circumstances over the term of extractive ...

  3. 2005-2008 government-ANDRA quadrennial contract

    International Nuclear Information System (INIS)

    2006-01-01

    Radioactive waste management represents an important field of intervention for public authorities who define and implement the public policy around these wastes. The public policy defines the safety framework of this management with a permanent care in ensuring the protection of people and of the environment. One fundamental step in the definition of the public policy was the vote of the law from December 30, 1991 which led to the creation of the national agency of radioactive wastes (ANDRA). The ANDRA is a public, industrial and commercial agency in charge of the long term management of radioactive wastes. In order to define the orientations of ANDRA's action, a contract was established in the year 2000 and signed in 2001 for the 2001-2004 era. It has consolidated the general framework of the agency's action and defined the goals to be reached. This contractual approach aimed at giving the public agency an accountableness and at defining priorities with respect to the actions to be implemented. (J.S.)

  4. 78 FR 6168 - Public Availability of Social Security Administration Fiscal Year (FY) 2012 Service Contract...

    Science.gov (United States)

    2013-01-29

    ... SOCIAL SECURITY ADMINISTRATION [Docket No. SSA-2013-0001] Public Availability of Social Security Administration Fiscal Year (FY) 2012 Service Contract Inventory AGENCY: Social Security Administration. ACTION: Notice of Public Availability of FY 2012 Service Contract Inventories. SUMMARY: In accordance with...

  5. 77 FR 3836 - Public Availability of Social Security Administration Fiscal Year (FY) 2011 Service Contract...

    Science.gov (United States)

    2012-01-25

    ... SOCIAL SECURITY ADMINISTRATION [Docket No. SSA-2011-0105] Public Availability of Social Security Administration Fiscal Year (FY) 2011 Service Contract Inventory AGENCY: Social Security Administration. ACTION: Notice of Public Availability of FY 2011 Service Contract Inventories. SUMMARY: In accordance with...

  6. 41 CFR 102-33.30 - What are the duties of an agency's Senior Aviation Management Official (SAMO)?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the duties of an agency's Senior Aviation Management Official (SAMO)? 102-33.30 Section 102-33.30 Public Contracts... § 102-33.30 What are the duties of an agency's Senior Aviation Management Official (SAMO)? The SAMO's...

  7. Pacta sunt servanda versus the social role of contracts: the case of Brazilian agriculture contracts

    Directory of Open Access Journals (Sweden)

    Christiane Leles Rezende

    2012-06-01

    Full Text Available This study explores the instability created by contradictory court decisions related with contract breaches. Forward marketing contracts represent an important source of resources to finance Brazilian agriculture, however a large number of contract breaches were observed during a period of marked increase in soy prices. The study analyzed 161 judicial appeal decisions and a survey was carried with 70 farmers. The results show the difference of judges' interpretation and the existence of second order effects. The effects of court decisions were more requirements of guarantees and the reduction in the number of contracts. Those soybean farmers who did not breach their contracts have also been negatively affected by the strategic reactions of trading and processing companies. The concept of "social function of the contract" introduced in Brazilian civil code led to a higher degree of instability in contracts, raising transaction costs and motivating private economic sanctions.

  8. Use of Contract Authority for Distribution Depots by the Defense Logistics Agency

    National Research Council Canada - National Science Library

    2001-01-01

    Contract authority is a form of budget authority granted by specific statutory authority to incur obligations in anticipation of either receipts or an appropriation of liquidating cash with which to pay the obligations...

  9. 48 CFR 801.690-5 - Requirements for contracting authority.

    Science.gov (United States)

    2010-10-01

    ..., purchasing, economics, industrial management, marketing, quantitative methods, or organization and management...) The Chief, ATCD, is responsible for the management of the ACEP, the program that assists contracting...) Education. (1) The 24 business-related college credits shall be in any combination of the following fields...

  10. 48 CFR 227.7102-3 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract clause. 227.7102..., DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7102-3 Contract clause. (a)(1) Except as provided in paragraph (b) of this subsection, use the...

  11. Choreography Synthesis as Contract Agreement

    Directory of Open Access Journals (Sweden)

    Julien Lange

    2013-10-01

    Full Text Available We propose a formal model for distributed systems, where each participant advertises its requirements and obligations as behavioural contracts, and where multiparty sessions are started when a set of contracts allows to synthesise a choreography. Our framework is based on the CO2 calculus for contract-oriented computing, and borrows concepts and results from the session type literature. It supports sessions where the number of participants is not determined beforehand, and keeps CO2's ability to rule out participants that are culpable if contracts are not fulfilled at runtime. We show that we have progress and session fidelity in CO2, as a result of the honesty of participants — i.e., their ability to always adhere to their contracts.

  12. A survey of formal languages for contracts

    DEFF Research Database (Denmark)

    Hvitved, Tom

    2010-01-01

    In this short paper we present the current status on formal languages and models for contracts. By a formal model is meant an unambiguous and rigorous representation of contracts, in order to enable their automatic validation, execution, and analysis — activates that are collectively referred...... to as contract lifecycle management (CLM). We present a set of formalism requirements, which represent features that any ideal contract model should support, based on which we present a comparative survey of existing contract formalisms....

  13. Russian Contract Law for Foreigners

    Directory of Open Access Journals (Sweden)

    Andrey Shirvindt

    2015-01-01

    Full Text Available The book by Maria Efremova, Svetlana Yakovleva and Jane Henderson aims to serve as a short introduction to Russian contract law for a foreign lawyer. Assuming that the target readership are mainly English lawyers the book’s second aim, expressly stated by the authors (pp. i, 1, is to make lawyers from common law countries familiar with codified law, with Russian law being just an example. The book covers most of the general law of obligations as well as some questions of formation and invalidity of contracts that belong to the general part of the Civil Сode, with this preceded by a brief introduction into the Russian law dealing with its history, federal structure and state agencies of Russia, its court system, sources of law and legal profession.

  14. 77 FR 9698 - Notice of Extension of Concession Contracts

    Science.gov (United States)

    2012-02-17

    ...-03 Dudley Food and Gulf Islands Beverage, Inc.. National Seashore. FOR FURTHER INFORMATION CONTACT... DEPARTMENT OF THE INTERIOR National Park Service Notice of Extension of Concession Contracts AGENCY: National Park Service, Interior. ACTION: Public notice. SUMMARY: The National Park Service hereby...

  15. 76 FR 12645 - Ownership Limitations and Governance Requirements for Security-Based Swap Clearing Agencies...

    Science.gov (United States)

    2011-03-08

    ... 3235-AK74 Ownership Limitations and Governance Requirements for Security- Based Swap Clearing Agencies... the Dodd-Frank Act, the Commission shall adopt such rules if it determines that they are necessary or appropriate to improve the governance of, or to mitigate systemic risk, promote competition or mitigate...

  16. Contract-based Internet Service Software Development

    DEFF Research Database (Denmark)

    Giambiagi, Pablo; Owe, Olaf; Schneider, Gerardo

    The fast evolution of the Internet has popularized service-oriented architectures dynamic IT-supported inter-business collaborations. Yet, interoperability between different organizations, requires contracts to reduce risks. Thus, high-level models of contracts are making their way into service...

  17. Increased muscle glucose uptake during contractions

    DEFF Research Database (Denmark)

    Ploug, Thorkil; Galbo, Henrik; Richter, Erik

    1984-01-01

    We reinvestigated the prevailing concept that muscle contractions only elicit increased muscle glucose uptake in the presence of a so-called "permissive" concentration of insulin (Berger et al., Biochem. J. 146: 231-238, 1975; Vranic and Berger, Diabetes 28: 147-163, 1979). Hindquarters from rats...... in severe ketoacidosis were perfused with a perfusate containing insulin antiserum. After 60 min perfusion, electrical stimulation increased glucose uptake of the contracting muscles fivefold. Also, subsequent contractions increased glucose uptake in hindquarters from nondiabetic rats perfused for 1.5 h......-methylglucose uptake increased during contractions and glucose uptake was negative at rest and zero during contractions. An increase in muscle transport and uptake of glucose during contractions does not require the presence of insulin. Furthermore, glucose transport in contracting muscle may only increase if glycogen...

  18. 76 FR 6827 - Public Availability of the National Aeronautic and Space Administration FY 2010 Service Contract...

    Science.gov (United States)

    2011-02-08

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION Public Availability of the National Aeronautic and Space Administration FY 2010 Service Contract Inventory AGENCY: National Aeronautic and Space Administration. ACTION: Notice of public availability of FY 2010 Service Contract Inventories. [[Page 6828...

  19. A SIMULATION OF CONTRACT FARMING USING AGENT BASED MODELING

    Directory of Open Access Journals (Sweden)

    Yuanita Handayati

    2016-12-01

    Full Text Available This study aims to simulate the effects of contract farming and farmer commitment to contract farming on supply chain performance by using agent based modeling as a methodology. Supply chain performance is represented by profits and service levels. The simulation results indicate that farmers should pay attention to customer requirements and plan their agricultural activities in order to fulfill these requirements. Contract farming helps farmers deal with demand and price uncertainties. We also find that farmer commitment is crucial to fulfilling contract requirements. This study contributes to this field from a conceptual as well as a practical point of view. From the conceptual point of view, our simulation results show that different levels of farmer commitment have an impact on farmer performance when implementing contract farming. From a practical point of view, the uncertainty faced by farmers and the market can be managed by implementing cultivation and harvesting scheduling, information sharing, and collective learning as ways of committing to contract farming.

  20. 5 CFR 1315.14 - Payments under construction contracts.

    Science.gov (United States)

    2010-01-01

    ... the contract; (ii) Payments to subcontractors and suppliers have been made from previous payments... withhold or retain from a subcontractor or supplier, in accordance with the terms and conditions of their..., increments, or segments of any project) that is approved as payable by the agency pursuant to paragraph (b...

  1. 78 FR 977 - Public Availability of the Department of Transportation FY 2012 Service Contract Inventory

    Science.gov (United States)

    2013-01-07

    ... Service Contract Inventory AGENCY: Department of Transportation. ACTION: Notice of Public Availability of FY 2012 Service Contract Inventories. SUMMARY: In accordance with Section 743 of Division C of the Consolidated Appropriations Act of 2010, Public Law 111-117, Department of Transportation is publishing this...

  2. "No-hire" clauses in healthcare sector contracts: their use and enforceability.

    Science.gov (United States)

    Basanta, W Eugene

    2006-01-01

    In today's healthcare industry, many hospitals utilize outside agencies for both business and clinical functions. This Article acknowledges the prevalence of outsourcing contract labor in the healthcare arena and focuses on the restrictive provisions included in these employment contracts, particularly "no-hire" clauses. No-hire clauses are often included in contracts between healthcare providers and professional groups that provide clinical service employees to the provider, such as a medical practice group providing physicians to a hospital or an agency providing nurses to a nursing home. These clauses usually provide that the healthcare provider may not directly hire an employee provided by the professional group, nor may it contract with another professional group that later hires the employee. The purpose of a no-hire clause is two-fold: to protect the professional group's investment of time and moneyfor recruiting, training, and establishing the employee's clinical practice, and to give the professional group leverage to retain its employees. While noncompete clauses in employment contracts have traditionally been the subject of litigation, no-hire clauses raise distinct legal issues. Case law provides conflicting views as to the enforceability of these provisions. Some courts find no-hire clauses to be per se illegal restrictions on trade, while others will permit them when they are reasonable within a specific context. The author proposes that a multifactor test be applied on a case-by-case basis to determine the reasonableness of the no-hire provision in a given employment contract and suggests drafting improvements to facilitate enforcement.

  3. 48 CFR 29.402-2 - Foreign cost-reimbursement contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Foreign cost-reimbursement... GENERAL CONTRACTING REQUIREMENTS TAXES Contract Clauses 29.402-2 Foreign cost-reimbursement contracts. (a) The contracting officer shall insert the clause at 52.229-8, Taxes—Foreign Cost-Reimbursement...

  4. 48 CFR 46.202-1 - Contracts for commercial items.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contracts for commercial... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-1 Contracts for commercial items. When acquiring commercial items (see part 12), the Government shall rely on contractors' existing...

  5. 48 CFR 629.402-1 - Foreign fixed-price contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Foreign fixed-price contracts. 629.402-1 Section 629.402-1 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS TAXES Contract Clauses 629.402-1 Foreign fixed-price contracts. ...

  6. 78 FR 13383 - Public Availability of the National Aeronautics and Space Administration FY 2012 Service Contract...

    Science.gov (United States)

    2013-02-27

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION Public Availability of the National Aeronautics and Space Administration FY 2012 Service Contract Inventory (SCI) AGENCY: Office of Procurement, National Aeronautics and Space Administration. ACTION: Notice of Public Availability of the FY 2012 Service Contract...

  7. 77 FR 7183 - Public Availability of the National Aeronautics and Space Administration FY 2011 Service Contract...

    Science.gov (United States)

    2012-02-10

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION Public Availability of the National Aeronautics and Space Administration FY 2011 Service Contract Inventory AGENCY: National Aeronautics and Space Administration. ACTION: Notice of Public Availability of Analysis of the FY 2010 Service Contract Inventories and...

  8. 48 CFR 239.7103 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Security and Privacy for Computer Systems 239.7103 Contract clauses. (a) Use the clause at 252.239-7000, Protection... requires protection against compromising emanations. (b) Use the clause at 252.239-7001, Information...

  9. 48 CFR 16.405 - Cost-reimbursement incentive contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement incentive contracts. 16.405 Section 16.405 Federal Acquisition Regulations System FEDERAL ACQUISITION...-reimbursement incentive contracts. See 16.301 for requirements applicable to all cost-reimbursement contracts...

  10. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  11. 48 CFR 908.1104 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 908.1104 Section 908.1104 Federal Acquisition Regulations System DEPARTMENT OF ENERGY COMPETITION ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Leasing of Motor Vehicles 908.1104 Contract clauses. (f...

  12. Optimal Contracting under Adverse Selection

    DEFF Research Database (Denmark)

    Lenells, Jonatan; Stea, Diego; Foss, Nicolai Juul

    2015-01-01

    We study a model of adverse selection, hard and soft information, and mentalizing ability--the human capacity to represent others' intentions, knowledge, and beliefs. By allowing for a continuous range of different information types, as well as for different means of acquiring information, we dev...... of that information. This strategy affects the properties of the optimal contract, which grows closer to the first best. This research provides insights into the implications of mentalizing for agency theory....

  13. 76 FR 2706 - Notice of Extension of Concession Contracts

    Science.gov (United States)

    2011-01-14

    ... Florida, Inc. GUIS001-03 Dudley Food and Gulf Islands National Seashore. Beverage. JODR002-90... DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE [NPS-WASO-CONC-0111-6327; 2410-OYC] Notice of Extension of Concession Contracts AGENCY: National Park Service, Interior. ACTION: Public notice. DATES...

  14. 76 FR 42140 - Public Availability of the Merit Systems Protection Board's FY 2010 Service Contract Inventory

    Science.gov (United States)

    2011-07-18

    ... MERIT SYSTEMS PROTECTION BOARD Public Availability of the Merit Systems Protection Board's FY 2010 Service Contract Inventory AGENCY: Merit Systems Protection Board. ACTION: Notice. SUMMARY: The Merit.../service-contract-inventories-guidance-11052010.pdf . The MSPB's inventory is posted on its Web site at...

  15. 41 CFR 301-11.20 - May my agency authorize a rest period for me while I am traveling?

    Science.gov (United States)

    2010-07-01

    ... am traveling? (a) Your agency may authorize a rest period not in excess of 24 hours at either an... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false May my agency authorize a rest period for me while I am traveling? 301-11.20 Section 301-11.20 Public Contracts and Property...

  16. PERFORMANCE-BASED CONTRACTING IN CONSTRUCTION PHASE AND MAINTENANCE PHASE OF PAVEMENT

    Science.gov (United States)

    Yoshida, Takeshi

    Performance-based contracting for pavement in Japan started as performance warranties in construction phase, in 1999. Recently, road agencies have recognized the applicability of this type of contracting in outsourcing of maintenance activities. The objectives of this study are to clarify the issues of performance specifying in construction phase and maintenance phase of pavement, and to propose measures to be taken. This paper, with the recognition that the life of each pavement depends on performance standards for various attributes, reviews domestic and foreign examples of performance-based contracting. A performance standard based on the average of current practices can enhance product quality and service life with a warranty contract. Repair thresholds and response time for each deficiency should be considered as performance standards in maintenance phase.

  17. The Research Contract Programme annual report and statistics for 2000

    International Nuclear Information System (INIS)

    2001-06-01

    53 Coordinated Research Projects (CRPs) were completed in 2000. 38 of these CRPs concerned topics in Nuclear Sciences and Applications and 15 were related to nuclear energy and safety. These CRPs were funded for $9,275,648; the average annual cost per CRP was $38,892. A list of these CRPs is included. Evaluations of these CRPs will be completed by the end of 2001 and included in the next annual report. The Agency's unique position as a technical international organization has enabled it to act as an international platform to lead groups of nuclear scientists by co-ordinating research and developmental activities addressing important problems in Member States. CRPs have been used to transfer existing technologies to developing countries, as well as for the development of new technologies in those countries. Since CRPs are tailored to finding solutions to specific problems, as compared to general techniques, their potential value in terms of the effect on Member States' level of development is substantial. In an effort to further enhance the effectiveness of CRPs developed and coordinated by the Agency, various initiatives have been suggested and the Research Contract Programme has been the subject of several advisory fora. The PPAS of Major Programme 2, the Senior Evaluation Group (SEG), and an internal audit of the programme have recently made recommendations to this end. Based on these reviews, the Agency has begun to fund fewer, but better focused and more substantially funded CRPs. Whereas in 1999, the Agency was carrying out 159 CRPs, 132 CRPs were carried out in 2000. The average annual amount of funding available per CRP during this period increased by 14%, from US $47,500 in 1999 to US $ 54,000 in 2000. In addition, the introduction of a new type of CRP (called Thematic CRP), meant to complement traditional CRPs, is currently being tested by the Human Health programme. This new, optional type of CRP is designed to strengthen promotion of research on nuclear

  18. The Research Contract Programme annual report and statistics for 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-15

    53 Coordinated Research Projects (CRPs) were completed in 2000. 38 of these CRPs concerned topics in Nuclear Sciences and Applications and 15 were related to nuclear energy and safety. These CRPs were funded for $9,275,648; the average annual cost per CRP was $38,892. A list of these CRPs is included. Evaluations of these CRPs will be completed by the end of 2001 and included in the next annual report. The Agency's unique position as a technical international organization has enabled it to act as an international platform to lead groups of nuclear scientists by co-ordinating research and developmental activities addressing important problems in Member States. CRPs have been used to transfer existing technologies to developing countries, as well as for the development of new technologies in those countries. Since CRPs are tailored to finding solutions to specific problems, as compared to general techniques, their potential value in terms of the effect on Member States' level of development is substantial. In an effort to further enhance the effectiveness of CRPs developed and coordinated by the Agency, various initiatives have been suggested and the Research Contract Programme has been the subject of several advisory fora. The PPAS of Major Programme 2, the Senior Evaluation Group (SEG), and an internal audit of the programme have recently made recommendations to this end. Based on these reviews, the Agency has begun to fund fewer, but better focused and more substantially funded CRPs. Whereas in 1999, the Agency was carrying out 159 CRPs, 132 CRPs were carried out in 2000. The average annual amount of funding available per CRP during this period increased by 14%, from US $47,500 in 1999 to US $ 54,000 in 2000. In addition, the introduction of a new type of CRP (called Thematic CRP), meant to complement traditional CRPs, is currently being tested by the Human Health programme. This new, optional type of CRP is designed to strengthen promotion of research on nuclear

  19. 76 FR 67182 - Agency Information Collection Activities; Proposed Collection; Comment Request; Background Checks...

    Science.gov (United States)

    2011-10-31

    ... receiving federal contracts. (2) Drug tests are for the presence of marijuana, cocaine, opiates... Employees (Renewal) and Drug Testing for Contract Employees (Renewal) AGENCY: Environmental Protection.... 3501 et seq.), this document announces that EPA is planning to submit a request to renew two existing...

  20. Utah Department of Transportation I-15 Case Study (Design-Build Contracting Strategy)

    National Research Council Canada - National Science Library

    Kimball, Donna

    1999-01-01

    .... In addition, if the contract continues on its successful path additional progressive legislation may be petitioned from state agencies seeking to increase the construction value for tax dollars expended...

  1. 48 CFR 232.704-70 - Incrementally funded fixed-price contracts.

    Science.gov (United States)

    2010-10-01

    ... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING...'s decision and terminate for the convenience of the Government. (c) The contracting officer shall...

  2. 41 CFR 102-117.270 - What are agency performance measures for transportation?

    Science.gov (United States)

    2010-07-01

    ...) Increase the use of electronic commerce; (2) Adopt industry best practices and services to meet your agency... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are agency... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...

  3. 48 CFR 1631.205-74 - FEHBP losses on other contracts.

    Science.gov (United States)

    2010-10-01

    ... carry forward” principle that is fundamental to continuing insurance contracts that are based on... MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 1631.205-74 FEHBP losses on...

  4. 48 CFR 2936.209 - Construction contracts with architect-engineer firms.

    Science.gov (United States)

    2010-10-01

    ... with architect-engineer firms. 2936.209 Section 2936.209 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 2936.209 Construction contracts with architect-engineer firms. As...

  5. 48 CFR 719.271-4 - Heads of contracting activities.

    Science.gov (United States)

    2010-10-01

    ... DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.271-4 Heads of contracting activities. In order for the agency small business program to be effective, the active support of top management... made by SDB; (b) Consulting with SDB in establishing small business and minority business enterprise...

  6. Ranking Performance Measures in Multi-Task Agencies

    DEFF Research Database (Denmark)

    Christensen, Peter Ove; Sabac, Florin; Tian, Joyce

    We derive sufficient conditions for ranking performance evaluation systems in multi-task agency models using both optimal and linear contracts in terms of a second-order stochastic dominance (SSD) condition on the likelihood ratios. The SSD condition can be replaced by a variance-covariance matrix...

  7. 41 CFR 302-3.421 - What are the income tax consequences when my agency pays for property management services?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What are the income tax consequences when my agency pays for property management services? 302-3.421 Section 302-3.421 Public Contracts... § 302-3.421 What are the income tax consequences when my agency pays for property management services...

  8. 41 CFR 102-118.60 - To what extent must my agency use electronic commerce?

    Science.gov (United States)

    2010-07-01

    ... agency use electronic commerce? 102-118.60 Section 102-118.60 Public Contracts and Property Management... Services § 102-118.60 To what extent must my agency use electronic commerce? Your agency must use electronic commerce in all areas of your transportation program. This includes the use of electronic systems...

  9. Differences in Services and Fees for Management and Administration of Iraq Reconstruction Contracts

    National Research Council Canada - National Science Library

    Warren, David; Childress, David; Salvatierra, George; Thompson, Chuck; Williams, Roger M

    2008-01-01

    ...), a field operating agency of the Air Force Civil Engineer, are two primary organizations providing project management and contract administration services for major Iraq reconstruction projects...

  10. UNIDROITED POSITION AS A SOURCE OF CONTRACT LAW IN THE FUTURE OF INDONESIAN CONTRACT LAW AMANDEMENT

    Directory of Open Access Journals (Sweden)

    N. Ike Kusmiati

    2018-01-01

    Full Text Available [Unidroited Position As A Source Of Contract Law In The Future Of Indonesian Contract Law Amandement] Business transaction often faced the issue of ensuring that the rights and obligation are fulfilled as the agreement as agreed, especially when facing the difficulties of the rights and obligation of the parties due to different legal system between countries. Thereore, to answer the problems  the parties will seek legal sources, namely book III of the Civil Code in addition to studying and understanding the principles of internasional commercial contract law, namely UNIDROIT which contains principles that can be adopted as one of the works that seek Standarization of contract law to encourage the harmonization of commercial law international efforts to bring together different business actors between countries, so that the same legal basis is required in the coming renewal of Indonesia contract law. Keyword : Position, UNIDROIT, Law, Contract, Indonesia.

  11. Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-07-01

    This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

  12. 41 CFR 301-2.2 - What travel expenses may my agency pay?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What travel expenses may my agency pay? 301-2.2 Section 301-2.2 Public Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES INTRODUCTION 2-GENERAL RULES § 301-2.2 What travel...

  13. 48 CFR 217.172 - Multiyear contracts for supplies.

    Science.gov (United States)

    2010-10-01

    ... law. For additional policies that apply only to multiyear contracts for weapon systems, see 217.173... requirements of law are met and there are no other statutory restrictions on using a multiyear contract for the... provisions in the contract do not include consideration of recurring manufacturing costs of the contractor...

  14. The Contracting Parties' Ability To Conclude The Employment Contract

    Directory of Open Access Journals (Sweden)

    Carmen Constantina NENU

    2014-08-01

    Full Text Available This study's main objective is to analyze certain effects produced by the changes of the Labor Code and by the entry into force of the current Romanian Civil Code. These effects refer to one of the fundamental conditions for the valid conclusion of the individual employment contract, that is, to the legal capacity of employers and employees. Thus, a complete analysis of legal regulations and of the correlations between different provisions on the legal capacity of parties to the individual employment contract is required to identify the existing noncompliance and to propose solutions. The research demonstrated that the current regulatory framework governing the legal capacity of the parties to an individual employment contract does not entirely correspond to the social reality. Therefore, only the employer benefits from a relatively comprehensive statutory regulation on the legal capacity to conclude an individual employment contract. The employee, however, does not benefit from the same attention from legislature. Considering the above, the study represents a significant scientific contribution, whose value lies in the proposed changes to modify legislature, so that the legal capacity of job holders would benefit from fair regulation, in accordance with the principle of legal protection of employee rights.

  15. 24 CFR 891.590 - Notice upon HAP contract expiration.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Notice upon HAP contract expiration... Handicapped-Section 8 Assistance § 891.590 Notice upon HAP contract expiration. (a) Notice required. The HAP contract will provide that the Borrower will, at least one year before the end of the HAP contract term...

  16. 48 CFR 232.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 232.102 Section 232.102 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 232.102 Description of contract financing methods. (e)(2) Progress payments...

  17. 76 FR 26948 - Small Business Jobs Act Tour: Selected Provisions Having an Effect on Government Contracting

    Science.gov (United States)

    2011-05-10

    ...] Small Business Jobs Act Tour: Selected Provisions Having an Effect on Government Contracting AGENCY: U.S... INFORMATION CONTACT: Richard L. Miller, Small Business Job's Act Tour-Office of Government Contracting and..., concerning the Small Business Act Tour: Selected Provisions Having an Effect on Government that announced a...

  18. 78 FR 62638 - Agency Recordkeeping/Reporting Requirements Under Emergency Review by the Office of Management...

    Science.gov (United States)

    2013-10-22

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Agency Recordkeeping/Reporting Requirements Under Emergency Review by the Office of Management and Budget (OMB) Title: Low Income Home Energy Assistance Program (LIHEAP) Grantee Needs Assessment. OMB No.: New Collection. Description: This information collection is a...

  19. Cytoskeletal Tropomyosin Tm5NM1 Is Required for Normal Excitation–Contraction Coupling in Skeletal Muscle

    Science.gov (United States)

    Vlahovich, Nicole; Kee, Anthony J.; Van der Poel, Chris; Kettle, Emma; Hernandez-Deviez, Delia; Lucas, Christine; Lynch, Gordon S.; Parton, Robert G.; Gunning, Peter W.

    2009-01-01

    The functional diversity of the actin microfilaments relies in part on the actin binding protein tropomyosin (Tm). The muscle-specific Tms regulate actin-myosin interactions and hence contraction. However, there is less known about the roles of the numerous cytoskeletal isoforms. We have shown previously that a cytoskeletal Tm, Tm5NM1, defines a Z-line adjacent cytoskeleton in skeletal muscle. Recently, we identified a second cytoskeletal Tm in this region, Tm4. Here we show that Tm4 and Tm5NM1 define separate actin filaments; the former associated with the terminal sarcoplasmic reticulum (SR) and other tubulovesicular structures. In skeletal muscles of Tm5NM1 knockout (KO) mice, Tm4 localization was unchanged, demonstrating the specificity of the membrane association. Tm5NM1 KO muscles exhibit potentiation of T-system depolarization and decreased force rundown with repeated T-tubule depolarizations consistent with altered T-tubule function. These results indicate that a Tm5NM1-defined actin cytoskeleton is required for the normal excitation–contraction coupling in skeletal muscle. PMID:19005216

  20. Cytoskeletal tropomyosin Tm5NM1 is required for normal excitation-contraction coupling in skeletal muscle.

    Science.gov (United States)

    Vlahovich, Nicole; Kee, Anthony J; Van der Poel, Chris; Kettle, Emma; Hernandez-Deviez, Delia; Lucas, Christine; Lynch, Gordon S; Parton, Robert G; Gunning, Peter W; Hardeman, Edna C

    2009-01-01

    The functional diversity of the actin microfilaments relies in part on the actin binding protein tropomyosin (Tm). The muscle-specific Tms regulate actin-myosin interactions and hence contraction. However, there is less known about the roles of the numerous cytoskeletal isoforms. We have shown previously that a cytoskeletal Tm, Tm5NM1, defines a Z-line adjacent cytoskeleton in skeletal muscle. Recently, we identified a second cytoskeletal Tm in this region, Tm4. Here we show that Tm4 and Tm5NM1 define separate actin filaments; the former associated with the terminal sarcoplasmic reticulum (SR) and other tubulovesicular structures. In skeletal muscles of Tm5NM1 knockout (KO) mice, Tm4 localization was unchanged, demonstrating the specificity of the membrane association. Tm5NM1 KO muscles exhibit potentiation of T-system depolarization and decreased force rundown with repeated T-tubule depolarizations consistent with altered T-tubule function. These results indicate that a Tm5NM1-defined actin cytoskeleton is required for the normal excitation-contraction coupling in skeletal muscle.

  1. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  2. 41 CFR 102-193.20 - What are the specific agency responsibilities for records management?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the specific agency responsibilities for records management? 102-193.20 Section 102-193.20 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT...

  3. 48 CFR 19.806 - Pricing the 8(a) contract.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Pricing the 8(a) contract...) Program) 19.806 Pricing the 8(a) contract. (a) The contracting officer shall price the 8(a) contract in accordance with subpart 15.4. If required by subpart 15.4, the SBA shall obtain certified cost or pricing...

  4. 40 CFR 152.95 - Citation of all studies in the Agency's files pertinent to a specific data requirement.

    Science.gov (United States)

    2010-07-01

    ... PROCEDURES Procedures To Ensure Protection of Data Submitters' Rights § 152.95 Citation of all studies in the... requirement. The applicant who selects this cite-all option must submit to the Agency: (a) A general offer to... may be limited to apply only to data pertinent to the specific data requirement(s) for which the cite...

  5. 48 CFR 2936.602 - Selection of firms for architect-engineer contracts.

    Science.gov (United States)

    2010-10-01

    ... architect-engineer contracts. 2936.602 Section 2936.602 Federal Acquisition Regulations System DEPARTMENT OF LABOR GENERAL CONTRACTING REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 2936.602 Selection of firms for architect-engineer contracts. ...

  6. 48 CFR 1432.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 1432.102 Section 1432.102 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 1432.102 Description of contract financing methods. Use of progress payments based on a percentage or stage...

  7. 48 CFR 932.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 932.102 Section 932.102 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 932.102 Description of contract financing methods. (e)(2) Progress payments based on a percentage or stage of...

  8. 48 CFR 432.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 432.102 Section 432.102 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 432.102 Description of contract financing methods. Progress payments based on a percentage or stage of completion are...

  9. 48 CFR 32.102 - Description of contract financing methods.

    Science.gov (United States)

    2010-10-01

    ... financing methods. 32.102 Section 32.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.102 Description of contract financing methods. (a) Advance payments are advances of money by the Government to a...

  10. On the Techniques and Tools for Privacy-Preserving Smart Contracts

    Directory of Open Access Journals (Sweden)

    Anastasia A. Barinova

    2017-06-01

    Full Text Available Currently, business processes become more and more complicated. Data used in these processes circulates mainly through the digital communications. Due to these conditions some kind of electronic contracts for business deals becomes necessary. Smart contracts should describe a set of conditions, implemented through some events in the real world and digital systems. The most important requirement for this technology is privacy ensuring. In this work we have explored existing projects of privacy-preserving smart contracts, defined comparison criteria, compared projects and made a conclusion about options required for smart contract frameworks.

  11. Strategic urban projects in Amsterdam and New York : Incomplete contracts and good faith in different legal systems

    NARCIS (Netherlands)

    Van der Veen, M.; Korthals Altes, W.K.

    2009-01-01

    Contracts between local government and private investment agencies play an important role in strategic urban projects. Real estate cycles provide only a narrow window of opportunity within which to draft such contracts. A legal system should therefore not impede the possibility of reaching an

  12. Why is cytoskeletal contraction required for cardiac fusion before but not after looping begins?

    Science.gov (United States)

    Shi, Yunfei; Varner, Victor D.; Taber, Larry A.

    2015-02-01

    Cytoskeletal contraction is crucial to numerous morphogenetic processes, but its role in early heart development is poorly understood. Studies in chick embryos have shown that inhibiting myosin-II-based contraction prior to Hamburger-Hamilton (HH) stage 10 (33 h incubation) impedes fusion of the mesodermal heart fields that create the primitive heart tube (HT), as well as the ensuing process of cardiac looping. If contraction is inhibited at or after looping begins at HH10, however, fusion and looping proceed relatively normally. To explore the mechanisms behind this seemingly fundamental change in behavior, we measured spatiotemporal distributions of tissue stiffness, stress, and strain around the anterior intestinal portal (AIP), the opening to the foregut where contraction and cardiac fusion occur. The results indicate that stiffness and tangential tension decreased bilaterally along the AIP with distance from the embryonic midline. The gradients in stiffness and tension, as well as strain rate, increased to peaks at HH9 (30 h) and decreased afterward. Exposure to the myosin II inhibitor blebbistatin reduced these effects, suggesting that they are mainly generated by active cytoskeletal contraction, and finite-element modeling indicates that the measured mechanical gradients are consistent with a relatively uniform contraction of the endodermal layer in conjunction with constraints imposed by the attached mesoderm. Taken together, our results suggest that, before HH10, endodermal contraction pulls the bilateral heart fields toward the midline where they fuse to create the HT. By HH10, however, the fusion process is far enough along to enable apposing cardiac progenitor cells to keep ‘zipping’ together during looping without the need for continued high contractile forces. These findings should shed new light on a perplexing question in early heart development.

  13. Why is cytoskeletal contraction required for cardiac fusion before but not after looping begins?

    International Nuclear Information System (INIS)

    Shi, Yunfei; Taber, Larry A; Varner, Victor D

    2015-01-01

    Cytoskeletal contraction is crucial to numerous morphogenetic processes, but its role in early heart development is poorly understood. Studies in chick embryos have shown that inhibiting myosin-II-based contraction prior to Hamburger–Hamilton (HH) stage 10 (33 h incubation) impedes fusion of the mesodermal heart fields that create the primitive heart tube (HT), as well as the ensuing process of cardiac looping. If contraction is inhibited at or after looping begins at HH10, however, fusion and looping proceed relatively normally. To explore the mechanisms behind this seemingly fundamental change in behavior, we measured spatiotemporal distributions of tissue stiffness, stress, and strain around the anterior intestinal portal (AIP), the opening to the foregut where contraction and cardiac fusion occur. The results indicate that stiffness and tangential tension decreased bilaterally along the AIP with distance from the embryonic midline. The gradients in stiffness and tension, as well as strain rate, increased to peaks at HH9 (30 h) and decreased afterward. Exposure to the myosin II inhibitor blebbistatin reduced these effects, suggesting that they are mainly generated by active cytoskeletal contraction, and finite-element modeling indicates that the measured mechanical gradients are consistent with a relatively uniform contraction of the endodermal layer in conjunction with constraints imposed by the attached mesoderm. Taken together, our results suggest that, before HH10, endodermal contraction pulls the bilateral heart fields toward the midline where they fuse to create the HT. By HH10, however, the fusion process is far enough along to enable apposing cardiac progenitor cells to keep ‘zipping’ together during looping without the need for continued high contractile forces. These findings should shed new light on a perplexing question in early heart development. (paper)

  14. 76 FR 35909 - Temporary Concession Contract for Blue Ridge Parkway

    Science.gov (United States)

    2011-06-20

    ... accommodations, food and beverage, retail sales, boat rentals, and other services at Crabtree Falls, Price Lake... DEPARTMENT OF THE INTERIOR National Park Service [NPS-WASO-CONC-0511-7182; 2410-OYC] Temporary Concession Contract for Blue Ridge Parkway AGENCY: National Park Service, Interior. ACTION: Notice of...

  15. 76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs

    Science.gov (United States)

    2011-07-21

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...

  16. 78 FR 32272 - Renewal of Agency Information Collection for Indian Self-Determination and Education Assistance...

    Science.gov (United States)

    2013-05-29

    ...] Renewal of Agency Information Collection for Indian Self- Determination and Education Assistance Contracts... of information titled, ``Indian Self-Determination and Education Assistance Contracts, 25 CFR part... conducted under their joint regulations, 25 CFR part 900, implementing the Indian Self-Determination and...

  17. 24 CFR 982.454 - Termination of HAP contract: Insufficient funding.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Termination of HAP contract... Assistance Payments Contract and Owner Responsibility § 982.454 Termination of HAP contract: Insufficient funding. The PHA may terminate the HAP contract if the PHA determines, in accordance with HUD requirements...

  18. Characteristics of nuclear contracts. Pt. 2

    International Nuclear Information System (INIS)

    Blanchard, R.

    1976-01-01

    When nuclear contracts are concluded account should be taken of their conditions of validity: the capacity of parties to undertake such commitment, freedom of consent, accuracy and observance of formalities. Once concluded, the contract is binding for the parties, subject to certain restrictions such as the theory of the unforeseeable. The party which fails to execute the contract is subject to sanctions. In an agreement covering the supply of a nuclear installation or equipment, various documents are attached to the contract proper, i.e. the technical instructions, the invoice and the estimate. The special clauses in nuclear contracts, include inter alia the special obligations imposed on the staff of the undertakings, the requirements to take out third party liability insurance, the very stringent conditions regarding taking over the installations and the guarantee (NEA) [fr

  19. 14 CFR 1260.148 - Contract provisions.

    Science.gov (United States)

    2010-01-01

    ... equivalent to five percent of the bid price. The “bid guarantee” shall consist of a firm commitment such as a... bidder shall, upon acceptance of his bid, execute such contractual documents as may be required within... contract price. A “performance bond” is one executed in connection with a contract to secure fulfillment of...

  20. 28 CFR 70.48 - Contract provisions.

    Science.gov (United States)

    2010-07-01

    ... bidder equivalent to five percent of the bid price. The “bid guarantee” must consist of a firm commitment... that the bidder must, upon acceptance of his bid, execute such contractual documents as may be required... contract price. A “performance bond” is one executed in connection with a contract to secure fulfillment of...

  1. 41 CFR 302-14.4 - Must my agency pay me a home marketing incentive?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false Must my agency pay me a home marketing incentive? 302-14.4 Section 302-14.4 Public Contracts and Property Management Federal Travel Regulation System RELOCATION ALLOWANCES RESIDENCE TRANSACTION ALLOWANCES 14-HOME MARKETING...

  2. 48 CFR 339.7103 - Solicitation and contract clause.

    Science.gov (United States)

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Information Security Management...-72, Security Requirements for Federal Information Technology Resources, in solicitations and contracts that involve contractor access to Federal information or Federal information systems. ...

  3. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  4. 40-Hz square-wave stimulation requires less energy to produce muscle contraction: compared with the TASER® X26 conducted energy weapon.

    Science.gov (United States)

    Comeaux, James A; Jauchem, James R; Cox, D Duane; Crane, Carrie C; D'Andrea, John A

    2013-07-01

    Conducted energy weapons (CEWs) (including the Advanced TASER(®) X26 model produced by TASER International, Inc.) incapacitate individuals by causing muscle contractions. In this study using anesthetized swine, the potential incapacitating effect of primarily monophasic, 19-Hz voltage imposed by the commercial CEW was compared with the effect of voltages imposed by a laboratory device that created 40-Hz square waves. Forces of muscle contraction were measured with the use of strain gauges. Stimulation with 40-Hz square waves required less pulse energy than stimulation with the commercial CEW to produce similar muscle contraction. The square-pulse stimulation, at the higher repetition rate, caused a more complete tetanus at a lower energy. Use of such a simple shape of waveform may be used to make future nonlethal weapon devices more efficient. © 2013 American Academy of Forensic Sciences Published 2013. This article is a U.S. Government work and is in the public domain in the U.S.A.

  5. Process Improvement for Interinstitutional Research Contracting.

    Science.gov (United States)

    Varner, Michael; Logan, Jennifer; Bjorklund, Todd; Whitfield, Jesse; Reed, Peggy; Lesher, Laurie; Sikalis, Amy; Brown, Brent; Drollinger, Sandy; Larrabee, Kristine; Thompson, Kristie; Clark, Erin; Workman, Michael; Boi, Luca

    2015-08-01

    Sponsored research increasingly requires multiinstitutional collaboration. However, research contracting procedures have become more complicated and time consuming. The perinatal research units of two colocated healthcare systems sought to improve their research contracting processes. The Lean Process, a management practice that iteratively involves team members in root cause analyses and process improvement, was applied to the research contracting process, initially using Process Mapping and then developing Problem Solving Reports. Root cause analyses revealed that the longest delays were the individual contract legal negotiations. In addition, the "business entity" was the research support personnel of both healthcare systems whose "customers" were investigators attempting to conduct interinstitutional research. Development of mutually acceptable research contract templates and language, chain of custody templates, and process development and refinement formats decreased the Notice of Grant Award to Purchase Order time from a mean of 103.5 days in the year prior to Lean Process implementation to 45.8 days in the year after implementation (p = 0.004). The Lean Process can be applied to interinstitutional research contracting with significant improvement in contract implementation. © 2015 Wiley Periodicals, Inc.

  6. 41 CFR 301-73.202 - Can contract fares be used for personal travel?

    Science.gov (United States)

    2010-07-01

    ... used for personal travel? 301-73.202 Section 301-73.202 Public Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES AGENCY RESPONSIBILITIES 73-TRAVEL... travel? No. ...

  7. Agile Contracts: Designing an Agile Team Selection Guideline

    DEFF Research Database (Denmark)

    Pries-Heje, Lene; Pries-Heje, Jan

    2014-01-01

    with “endless” re-negotiation of the requirements; you need a more flexible way to develop IS. A new way of coping with many changes is to use an agile development approach and a fixed budget and resources contract. This paper presents an example case. We analyse the case and design a guideline for how......When you have stable and non-ambiguous requirements then a classic contract for IS between a supplier and a public sector institution based on a requirements specification may be well suited. However, if you have to accept many changes or have ambiguous requirements then you may end up...... to implement a fixed budget and resources contract in the public sector. The guideline includes elements to cope with challenges in a tender process such as transparency, criteria for supplier selection, and live assessment of resource skills and capabilities, as well as achieving the flexibility for change...

  8. Construction contract risk and reasonable evasions

    International Nuclear Information System (INIS)

    Wu Yunpeng

    2012-01-01

    Construction project has the characteristics such as large-scale investment, long-period implementation, excessive uncertainties,a single piece of production, etc. These characteristics determine the complexity of a construction project contract. To guarantee the time limit and quality of a project, finding ways to reduce and evade the contract risks as well as avoid unnecessary disputes are urgent requirements for each project manager. According to the practical situation, project contract risks are analyzed and illustrated in detail, and the concrete solutions for evading those risks are put forward. (authors)

  9. 41 CFR 102-79.20 - What standard must Executive agencies promote when assigning space?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What standard must Executive agencies promote when assigning space? 102-79.20 Section 102-79.20 Public Contracts and Property... PROPERTY 79-ASSIGNMENT AND UTILIZATION OF SPACE Assignment and Utilization of Space Assignment of Space...

  10. 48 CFR 1335.016-70 - DOC procedures for the use of broad agency announcements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOC procedures for the use of broad agency announcements. 1335.016-70 Section 1335.016-70 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1335.016-70 DOC...

  11. 41 CFR 102-74.15 - What are the facility management responsibilities of occupant agencies?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the facility management responsibilities of occupant agencies? 102-74.15 Section 102-74.15 Public Contracts and Property... PROPERTY 74-FACILITY MANAGEMENT Facility Management § 102-74.15 What are the facility management...

  12. Natural gas contracts in efficient portfolios

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, R.J.

    1994-12-01

    This report addresses the {open_quotes}contracts portfolio{close_quotes} issue of natural gas contracts in support of the Domestic Natural Gas and Oil Initiative (DGOI) published by the U.S. Department of Energy in 1994. The analysis is a result of a collaborative effort with the Public Service Commission of the State of Maryland to consider {open_quotes}reforms that enhance the industry`s competitiveness{close_quotes}. The initial focus of our collaborative effort was on gas purchasing and contract portfolios; however, it became apparent that efficient contracting to purchase and use gas requires a broader consideration of regulatory reform. Efficient portfolios are obtained when the holder of the portfolio is affected by and is responsible for the performance of the portfolio. Natural gas distribution companies may prefer a diversity of contracts, but the efficient use of gas requires that the local distribution company be held accountable for its own purchases. Ultimate customers are affected by their own portfolios, which they manage efficiently by making their own choices. The objectives of the DGOI, particularly the efficient use of gas, can be achieved when customers have access to suppliers of gas and energy services under an improved regulatory framework. The evolution of the natural gas market during the last 15 years is described to account for the changing preferences toward gas contracts. Long-term contracts for natural gas were prevalent before the early 1980s, primarily because gas producers had few options other than to sell to a single pipeline company, and this pipeline company, in turn, was the only seller to a gas distribution company.

  13. A Continuous-Time Agency Model of Optimal Contracting and Capital Structure

    OpenAIRE

    Peter M. DeMarzo; Yuliy Sannikov

    2004-01-01

    We consider a principal-agent model in which the agent needs to raise capital from the principal to finance a project. Our model is based on DeMarzo and Fishman (2003), except that the agent's cash flows are given by a Brownian motion with drift in continuous time. The difficulty in writing an appropriate financial contract in this setting is that the agent can conceal and divert cash flows for his own consumption rather than pay back the principal. Alternatively, the agent may reduce the mea...

  14. 48 CFR 27.201-2 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... the patent indemnity clause. Exclusion from indemnity of identified patents, as distinguished from... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clauses. 27.201-2... REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patents and Copyrights 27.201-2 Contract clauses. (a)(1) Insert the...

  15. 48 CFR 227.7103-6 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... software or computer software documentation (see 227.72), commercial items (see 227.7102-3), existing works...-engineer and construction contracts. (b)(1) Use the clause at 252.227-7013 with its Alternate I in research... Software Previously Delivered to the Government, in solicitations when the resulting contract will require...

  16. AGENCY CONTRIBUTION IN ACHIEVING TEMPORARY AGENCY WORKERS’ ORGANIZATIONAL COMMITMENT: A STUDY IN ABC (PVT LTD

    Directory of Open Access Journals (Sweden)

    T.G.T.N Perera

    2017-12-01

    Full Text Available Temporary agency workers are coming under non-standard employments, who have temporary attachment to the working organization. With dynamic business environment and flexible work arrangements, temporary agency employments are also emerged in Sri Lanka. Temporary agency workers are dual committed employees. However, with this dual commitment, organizations face issues in achieving temporary agency workers’ commitment due to low attention of agencies to temporary agency workers. Even though the Client organization provides due attention to temporary agency workers, they fail to receive due commitment due to the lack of attention from agency to temporary agency workers. This study was conducted to identify the agency related factors affecting temporary agency workers’ commitment. This was carried out as a cross sectional field study with a sample of 93 workers from temporary agency works in the ABC (pvt ltd. 93 temporary agency workers were selected as sample. Data were collected via a standard questionnaire that met accepted standards of validity and reliability. Descriptive statistics, Simple ranking, Factor analysis, ANOVA and Independent Sample T-Test technique were performed to analyze data. No of Temporary workers to supervisor (temp to consult ratio is the most influencing factor of temporary agency workers’ commitment in agency context. Job satisfaction, agency support, side bets, interactional justice, lack of alternative employments, procedural justice, distributive justice, reciprocity norm acceptance, socialization, breach of psychological contract, lack of skill transferability are the other factors, which are ordered from most influencing factor to less affecting factor to workers’ organizational commitment . Findings revealed that eleven out of thirteen factors are job related factors, other two are organization related and person related factors. Most client companies provide their attention, while agencies fail to provide

  17. Can HR practices retain flexworkers with their agency?

    NARCIS (Netherlands)

    Kroon, B.; Freese, C.

    2013-01-01

    Purpose Workers have different motives to be employed at specialist contract work agencies, such as career development aspirations, or a desire for freedom and independence. The purpose of this paper is to study how these different motives relate to the appreciation of HR practices applied by

  18. 21 CFR 21.70 - Disclosure and intra-agency use of records in Privacy Act Record Systems; no accounting required.

    Science.gov (United States)

    2010-04-01

    ... requirements of this part under § 21.30. (b) No accounting is required for any disclosure or use under... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Disclosure and intra-agency use of records in Privacy Act Record Systems; no accounting required. 21.70 Section 21.70 Food and Drugs FOOD AND DRUG...

  19. 78 FR 57873 - 60-Day Notice of Proposed Information Collection: HUD-Owned Real Estate-Sales Contract and Addendums

    Science.gov (United States)

    2013-09-20

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-36] 60-Day Notice of Proposed Information Collection: HUD-Owned Real Estate--Sales Contract and Addendums AGENCY: Office of the Assistant... Information Collection Title of Information Collection: HUD-Owned Real Estate--Sales Contract and Addendums...

  20. 78 FR 12138 - Agency Information Collection Activities: Request for Comments for a New Information Collection

    Science.gov (United States)

    2013-02-21

    ... collection, including: (1) Whether the proposed collection is necessary for the FHWA's performance; (2) the... State Transportation Agencies (STAs) on all work being performed on Federal-aid contracts during the... data on these contracts and includes the number of minorities, women, and non-minorities in specific...

  1. Custom, contract, and kidney exchange.

    Science.gov (United States)

    Healy, Kieran; Krawiec, Kimberly D

    2012-01-01

    In this Essay, we examine a case in which the organizational and logistical demands of a novel form of organ exchange (the nonsimultaneous, extended, altruistic donor (NEAD) chain) do not map cleanly onto standard cultural schemas for either market or gift exchange, resulting in sociological ambiguity and legal uncertainty. In some ways, a NEAD chain resembles a form of generalized exchange, an ancient and widespread instance of the norm of reciprocity that can be thought of simply as the obligation to “pay it forward” rather than the obligation to reciprocate directly with the original giver. At the same time, a NEAD chain resembles a string of promises and commitments to deliver something in exchange for some valuable consideration--that is, a series of contracts. Neither of these salient "social imaginaries" of exchange--gift giving or formal contract--perfectly meets the practical demands of the NEAD system. As a result, neither contract nor generalized exchange drives the practice of NEAD chains. Rather, the majority of actual exchanges still resemble a simpler form of exchange: direct, simultaneous exchange between parties with no time delay or opportunity to back out. If NEAD chains are to reach their full promise for large-scale, nonsimultaneous organ transfer, legal uncertainties and sociological ambiguities must be finessed, both in the practices of the coordinating agencies and in the minds of NEAD-chain participants. This might happen either through the further elaboration of gift-like language and practices, or through a creative use of the cultural form and motivational vocabulary, but not necessarily the legal and institutional machinery, of contract.

  2. Software Support for Industrial Controls Contract

    CERN Document Server

    Sánchez-Corral, E

    2001-01-01

    The contract covers the development and the operation and maintenance (O&M) of the monitoring and control systems used for supervising CERN's technical infrastructure. The contract involves those responsible for equipment in any current or future technical installation. We are outsourcing a complex activity which will require efforts on both preparing the specifications for new projects and setting clear definitions of tasks and procedures for O&M. It is a result-oriented contract in which performance will be continually evaluated by different methods and tools: project management plan and project follow-up, and CAMMS (Computerised Assets and Maintenance Management system). To be used effectively, this approach requires complete traceability of activities and documentation of the systems. Based on the analysis of the results measured and the shared (CERN and contractor) experience, the O&M activities will be reviewed and reorganised and operational procedures will be changed according to needs. A ...

  3. Financing Solar Energy Systems with Energy Savings Performance Contracts in the Federal Sector: Results of a Survey on Barriers

    Energy Technology Data Exchange (ETDEWEB)

    Gee, R. C.; LaPorta, C.

    1999-08-17

    This report summarizes the findings of an investigation into financing solar energy systems for the Federal sector. The objectives of the investigation were (1) to identify the barriers that impede companies from using Energy Savings Performance Contracts (ESPCs) to develop solar energy projects for Federal facilities, and (2) to clarify the impacts of Federal contracting requirements on energy service companies' use of ESPCs. Twenty-four representatives of energy service companies agreed to be interviewed. Their responses indicate that these are the primary barriers to greater use of ESPCs: the relatively long payback periods for investments in solar technologies; the length of the ESPC process; the cost of certain contractual requirements regarding wages and financing; and a lack of knowledge about the actual cost and reliability of solar systems. The report proposes a number of actions the government could take to remove these barriers, including (1) streamlining and shortening the ESPC process and (2) doing more to inform both government agencies and energy service companies about the costs and benefits of solar systems.

  4. State-Ademe contracts on objectives and performance 2016-2019. Synthesis

    International Nuclear Information System (INIS)

    2016-04-01

    This publication indicates the main strategic orientations of the ADEME from 2016 to 2019 as they have been defined in contracts between the French State and this public agency. It indicates how this agency promotes and supports innovation and prepares the future of the ecological and energy transition, and how it contributes to the collective expertise for an ecological and energy transition. It also presents operational objectives by distinguishing transverse, thematic (energy, climate change and air quality, circular economy) and support (governance, budgetary, financial and logistic management) objectives

  5. Managing the risks associated with natural gas purchase contracts

    International Nuclear Information System (INIS)

    Brett, T.

    2003-01-01

    This presentation described different styles of gas contracts. When markets opened in 1986, many contracts were between end users and producers, and a few marketers. Typically, contracts were for a fixed price and term. In 1990, when gas futures contracts began trading on NYMEX, contracts began to have floating prices, and prices linked to NYMEX prices. Standard gas contracts were developed in the mid-late 1990s. This paper described the differences between plain retail gas contracts, retail gas contracts between mass marketers and end users, wholesale contracts, contracts between producers and marketers, transportation contracts and domestic contracts. Both contracting parties obtain business and legal advice from consultants and lawyers with knowledge in energy transactions. Master agreement contracts were also described with reference to the Gas EDI contract. Examples of changing regulatory requirements were also outlined along with some traps to avoid. Bundled transportation agreements are standard documents that can be negotiated in special circumstances to charge customers who fail to deliver. They should be considered as tariffs

  6. Contingency Contracting within the Department of Defense: A Comparative Analysis

    National Research Council Canada - National Science Library

    McMillion, Chester

    2000-01-01

    .... The thesis compares and contrasts the regulations governing the contingency contracting operations, the organization structure, contingency contracting support plans, and the training requirements...

  7. 41 CFR 302-12.4 - For what relocation services expenses will my agency pay?

    Science.gov (United States)

    2010-07-01

    ... actual expenses the company incurs on your behalf, payment to the company is limited to what you would... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false For what relocation services expenses will my agency pay? 302-12.4 Section 302-12.4 Public Contracts and Property Management...

  8. Population-based contracting (population health): part II.

    Science.gov (United States)

    Jacofsky, D J

    2017-11-01

    Modern healthcare contracting is shifting the responsibility for improving quality, enhancing community health and controlling the total cost of care for patient populations from payers to providers. Population-based contracting involves capitated risk taken across an entire population, such that any included services within the contract are paid for by the risk-bearing entity throughout the term of the agreement. Under such contracts, a risk-bearing entity, which may be a provider group, a hospital or another payer, administers the contract and assumes risk for contractually defined services. These contracts can be structured in various ways, from professional fee capitation to full global per member per month diagnosis-based risk. The entity contracting with the payer must have downstream network contracts to provide the care and facilities that it has agreed to provide. Population health is a very powerful model to reduce waste and costs. It requires a deep understanding of the nuances of such contracting and the appropriate infrastructure to manage both networks and risk. Cite this article: Bone Joint J 2017;99-B:1431-4. ©2017 The British Editorial Society of Bone & Joint Surgery.

  9. 78 FR 66040 - 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate-Sales Contract and Addendums

    Science.gov (United States)

    2013-11-04

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-91] 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate--Sales Contract and Addendums AGENCY: Office of the Chief... published a 30 day notice of proposed information collection entitled HUD-Owned Real Estate-Sales Contract...

  10. What constitutes the gas sales contract in the evolving marketplace?

    International Nuclear Information System (INIS)

    Hughes, T.M.

    1996-01-01

    A general overview of certain fundamental issues of contract law, which are relevant to gas sales transactions, was presented. Since deregulation, parties of the Canadian natural gas market are free to negotiate the terms of arrangements and contracts with any number of buyers and sellers. With deregulation also came a substantial increase in the amount of litigation regarding sales contracts. Two basic issues that should be kept in mind when negotiating any gas sales contract were letter agreements, (two versions of non-binding letters of intent), and requirement of writing. Within the requirements of writing one should be mindful of the legal implications of the fraud statutes, the Sale of Goods Act, what constitutes a sufficient note or memorandum, what constitutes the requisite signature, contracting out of the requirement of writing and signature on the mass agreement, certainty of terms, and the terms implied by legislation. It was considered advantageous for both buyers and sellers to continue to be vigilant about the contractual arrangements respecting all of their gas transactions

  11. 75 FR 2109 - Notice of Availability of Final Contracting Policy

    Science.gov (United States)

    2010-01-14

    ...-sector companies available to State and local government entities that have a need for the services... will continue to examine ways to improve its contracting processes, including minimizing the turnover frequency of contracting personnel and reducing the length of time required to award contracts and task...

  12. 78 FR 73104 - Federal Travel Regulation (FTR); Agency Requirements for Payment of Expenses Connected With the...

    Science.gov (United States)

    2013-12-05

    ... the approval of the Office of Management and Budget under 44 U.S.C. 3501, et seq. E. Small Business... for Payment of Expenses Connected With the Death of Certain Employees and Family Members AGENCY... requirements for payment of expenses connected with the death of certain employees and family members. This...

  13. 48 CFR 16.601 - Time-and-materials contracts.

    Science.gov (United States)

    2010-10-01

    ... contracts for certain commercial services. (1) Government surveillance. A time-and-materials contract..., appropriate Government surveillance of contractor performance is required to give reasonable assurance that... procedures, the fixed hourly rates for services that meet the definition of commercial item at 2.101 that are...

  14. Double Dutch : On the role of the transparency requirement with regard to the language in which standard contract terms for B2C-contracts must be drafted

    NARCIS (Netherlands)

    Loos, M.

    2017-01-01

    European legislation currently does not clearly determine in what language standard contract terms must be drafted in order to be validly incorporated into consumer contracts so they can be relied upon by a trader. This may be particularly problematic in the case of a cross-border contract as

  15. 48 CFR 216.601 - Time-and-materials contracts.

    Science.gov (United States)

    2010-10-01

    ...-Hour Proposal Requirements—Non-Commercial Item Acquisition with Adequate Price Competition, with 252... contract type for non-commercial items if the price is expected to be based on adequate competition. [71 FR... of the contract or order; establishing fixed prices for portions of the requirement); and (D...

  16. Green Performance Contracting Strategy for Highway Construction Projects

    OpenAIRE

    2014-01-01

    With the growing awareness of sustainability and global climate change, state highway agencies are taking essential steps to reduce carbon emissions from highway infrastructure on a life cycle basis. While much is known regarding climate change mitigation and adaption strategies during highway operation, very little is understood about how climate change issues should be integrated into highway planning, delivery, and construction processes. This paper presents the current contracting pra...

  17. In vitro contraction of cytokinetic ring depends on myosin II but not on actin dynamics.

    Science.gov (United States)

    Mishra, Mithilesh; Kashiwazaki, Jun; Takagi, Tomoko; Srinivasan, Ramanujam; Huang, Yinyi; Balasubramanian, Mohan K; Mabuchi, Issei

    2013-07-01

    Cytokinesis in many eukaryotes involves the contraction of an actomyosin-based contractile ring. However, the detailed mechanism of contractile ring contraction is not fully understood. Here, we establish an experimental system to study contraction of the ring to completion in vitro. We show that the contractile ring of permeabilized fission yeast cells undergoes rapid contraction in an ATP- and myosin-II-dependent manner in the absence of other cytoplasmic constituents. Surprisingly, neither actin polymerization nor its disassembly is required for contraction of the contractile ring, although addition of exogenous actin-crosslinking proteins blocks ring contraction. Using contractile rings generated from fission yeast cytokinesis mutants, we show that not all proteins required for assembly of the ring are required for its contraction in vitro. Our work provides the beginnings of the definition of a minimal contraction-competent cytokinetic ring apparatus.

  18. The debtor-friendly fallacy in business rescue: Agency theory moderation and quasi relationships

    Directory of Open Access Journals (Sweden)

    Marius Pretorius

    2016-11-01

    Full Text Available Tension often arises when Chapter 6 business rescue practitioners (BRPs are appointed by directors to rescue their distressed businesses. Regulating by means of standard agency contracting becomes irrelevant in the resulting multiple relationships. Looking through the agency lens, using analytic autoethnography and compiling narratives, this paper explains the perceptions of what appear to be quasiagency relationships and obtains a better understanding of these. The findings suggest that the apparent principal-agent relationships suffer from asymmetries of goals, information access, informal power and diverging perceptions of moral hazard, transaction costs and adverse selection. As a solution, contracting has been shown to have limited value owing to outcome uncertainty and measurability. This is because the tasks of the BRP are non-programmable and term-dependent. The findings provide filing directors, shareholders, creditors, regulatory authorities and BRPs in this newly instituted regime, with enhanced understanding of how the relationships manifest in practice and overcome the non-contractibility of the newly formed relationships.

  19. Contracting for Computer Software in Standardized Computer Languages

    Science.gov (United States)

    Brannigan, Vincent M.; Dayhoff, Ruth E.

    1982-01-01

    The interaction between standardized computer languages and contracts for programs which use these languages is important to the buyer or seller of software. The rationale for standardization, the problems in standardizing computer languages, and the difficulties of determining whether the product conforms to the standard are issues which must be understood. The contract law processes of delivery, acceptance testing, acceptance, rejection, and revocation of acceptance are applicable to the contracting process for standard language software. Appropriate contract language is suggested for requiring strict compliance with a standard, and an overview of remedies is given for failure to comply.

  20. 7 CFR 1942.9 - Planning, bidding, contracting, and constructing. [See §§ 1942.17(p) and 1942.18

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Planning, bidding, contracting, and constructing. [See...) ASSOCIATIONS Community Facility Loans § 1942.9 Planning, bidding, contracting, and constructing. [See §§ 1942....18(l) of this subpart will not be considered when an FmHA or its successor agency under Public Law...

  1. 41 CFR 102-79.110 - What Integrated Workplace policy must Federal agencies strive to promote?

    Science.gov (United States)

    2010-07-01

    ... capital costs over a substantial time period; and (i) Support alternative workplace arrangements... Workplace policy must Federal agencies strive to promote? 102-79.110 Section 102-79.110 Public Contracts and... Integrated Workplace § 102-79.110 What Integrated Workplace policy must Federal agencies strive to promote...

  2. 48 CFR 742.1170-4 - Progress reporting requirements and contract clause.

    Science.gov (United States)

    2010-10-01

    ... progress. (b) Because the cognizant technical officer is the individual most familiar with the contractor's performance, the contractor must submit the progress reports directly to the cognizant technical officer. The cognizant technical officer must review the reports and advise the contracting officer, in writing, of any...

  3. 40 CFR Appendix C-2 to Subpart E... - Required Provisions-Construction Contracts

    Science.gov (United States)

    2010-07-01

    ... of another contractor in the performance of a contract with the owner, fires, floods, epidemics... agents or representatives offered or gave gratuities (in the form of entertainment, gifts, or otherwise...

  4. Method Determining the Contents of the Contract

    Directory of Open Access Journals (Sweden)

    Agus Yudha Hernoko

    2017-03-01

    Full Text Available The contents of the contract are primarily determined by what the real mutually agreed upon by the parties. By interpreting some certain statements, in this case to determine its meaning, to be clear based on what the parties committed themselves. Why is the interpretation required? In facts, on the many cases provided a valuable lesson, how many commercial disputes arise when the performance of the contract. The dispute begins when the parties have a different understanding of the statement that they use in the contract. Indeed, businesses are very familiar with the business processes that they do, but at the time of the business process are set forth in the contract language and designed by those who do not understand the legal aspects of the contract, the contract can be ascertained open possibility for disputes. The power of contract binding (the contents of the agreement toward to the characteristic and the wide spectrum of the rights and obligations contractually, basically a contract represents the power of performance among others in order implementing the rights and obligations of the parties. As an instrument to understand the contract, the method of determining the content of the contract (e.g., through interpretation, autonomous and heteronomous factors, further can be used to assess the reciprocation of rights and obligations in a meaningful and proportional contractual relationship.

  5. Government/Andra 2001/2004 quadrennial contract

    International Nuclear Information System (INIS)

    2002-01-01

    The French national agency for the management of radioactive wastes (ANDRA) was created on December 31, 1991 with the objective of carrying out research works in the domain of the long term management of radioactive wastes: research programs, management of waste disposal facilities, realisation and exploitation of underground laboratories for the design and setting up of new disposal facilities, definition of safety rules, conditioning and disposal specifications, inventory and localization of all radioactive wastes inside the French territory. This documents aims at defining the missions of the Andra for the 2001-2004 era, ten years after its creation: classification of radioactive wastes; positioning and missions of the Agency; objectives for the industrial mission (safety, storage and disposal solutions, management solutions, continuation of the inventory work, optimization of disposal costs, memory and surveillance); objectives of the research mission (high scientific level projects, structuration of researches, reinforcement of the coordination between the 3 axes of the 1991 law, exploitation and management of underground laboratories, spreading out of scientific results); objectives of the information mission (inventory and localization of wastes, realization of a reference inventory, contribution to the local information, proposal for a clear and verifiable information); international policy objectives (promotion of contacts and cooperations with foreign partners, representation of the Agency among the big international organizations, punctual missions for the valorization of the Agency competencies); evaluation and quality assurance inside the Agency (safety evaluation, scientific and technical evaluation, quality policy and environment, ethics, contract follow up). (J.S.)

  6. 48 CFR 6103.304 - Reply to the audit division and agency responses [Rule 304].

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Reply to the audit division and agency responses [Rule 304]. 6103.304 Section 6103.304 Federal Acquisition Regulations System CIVILIAN BOARD OF CONTRACT APPEALS, GENERAL SERVICES ADMINISTRATION TRANSPORTATION RATE CASES 6103.304 Reply to the audit division and agency...

  7. How to evaluate and compare maintenance contracts: a checklist.

    Science.gov (United States)

    Gustine, S M; Young, P

    1986-07-01

    Several factors need to be considered when comparing computerized tomography (CT) maintenance contracts. Five areas in particular require careful review to ensure that an institution is getting maximum value for its contract dollars: the credibility of the servicing company; the servicing engineer's qualifications and commitments; a thorough understanding of contract terminology; accurate analysis standards; and professionalism. The following article examines each of these areas in closer detail.

  8. The small GTPase Rac1 is required for smooth muscle contraction

    DEFF Research Database (Denmark)

    Rahman, Awahan; Davis, Benjamin; Lövdahl, Cecilia

    2014-01-01

    The role of the small GTP-binding protein Rac1 in smooth muscle contraction was examined using small molecule inhibitors (EHT1864, NSC23766) and a novel smooth muscle-specific, conditional, Rac1 knockout mouse strain. EHT1864, which affects nucleotide binding and inhibits Rac1 activity, concentra...

  9. Collaboration, Competition, and Co-opetition: Interorganizational Dynamics Between Private Child Welfare Agencies and Child Serving Sectors.

    Science.gov (United States)

    Bunger, Alicia C; Collins-Camargo, Crystal; McBeath, Bowen; Chuang, Emmeline; Perez-Jolles, Monica; Wells, Rebecca

    2014-03-01

    Human service agencies are encouraged to collaborate with other public and private agencies in providing services to children and families. However, they also often compete with these same partners for funding, qualified staff, and clientele. Although little is known about complex interagency dynamics of competition and collaboration in the child-serving sector, evidence suggests that competition can undermine collaboration unless managed strategically. This study explores the interrelationship between competition and collaboration, sometimes referred to as "co-opetition." Using a national dataset of private child and family serving agencies, we examine their relationships with other child serving sectors (N=4460 pair-wise relationships), and explore how variations in patterns of collaboration and competition are associated with several organizational, environmental and relational factors. Results suggest that most relationships between private child welfare agencies and other child serving agencies are characterized by both competition and collaboration (i.e. "co-opetition"), and is most frequently reported with other local private child welfare agencies. Logistic regression analyses indicate that co-opetition is likely to occur when private child welfare agencies have a good perceived relationship or a sub-contract with their partner. Findings have implications for how agency leaders manage partner relationships, and how public child welfare administrators structure contracts.

  10. 76 FR 5567 - Service Contract Inventory for Fiscal Year (FY) 2010

    Science.gov (United States)

    2011-02-01

    ... DEPARTMENT OF EDUCATION Service Contract Inventory for Fiscal Year (FY) 2010 AGENCY: Office of the Chief Financial Officer, U.S. Department of Education. ACTION: Notice of availability--FY 2010 Service.... Skelly, Chief Financial Officer. [FR Doc. 2011-2236 Filed 1-28-11; 11:15 am] BILLING CODE 4000-01-P ...

  11. 78 FR 10611 - Service Contract Inventory for Fiscal Year (FY) 2012

    Science.gov (United States)

    2013-02-14

    ... DEPARTMENT OF EDUCATION Service Contract Inventory for Fiscal Year (FY) 2012 AGENCY: Office of the Chief Financial Officer, U.S. Department of Education. ACTION: Notice of availability--FY 2012 service... Deputy Chief Financial Officer. [FR Doc. 2013-03441 Filed 2-13-13; 8:45 am] BILLING CODE 4000-01-P ...

  12. 26 CFR 1.401(a)(9)-6 - Required minimum distributions for defined benefit plans and annuity contracts.

    Science.gov (United States)

    2010-04-01

    ... under the annuity contract. The actuarial present value of any additional benefits described under this... actuarial present value of any additional benefits provided under an annuity contract described in paragraph... beneficiary under the contract and the actuarial present value of the additional benefits is no more than 120...

  13. 75 FR 26916 - Federal Acquisition Regulation: FAR Case 2009-004, Enhancing Contract Transparency

    Science.gov (United States)

    2010-05-13

    ... Regulation: FAR Case 2009-004, Enhancing Contract Transparency AGENCY: Department of Defense (DoD), General... commercial or financial information. This transparency effort is intended to promote efficiency in Government... the Administration's memorandum entitled Transparency and Open Government (January 21, 2009...

  14. 77 FR 5614 - Department of State FY11 Service Contract Inventory

    Science.gov (United States)

    2012-02-03

    ... DEPARTMENT OF STATE [Public Notice 7785] Department of State FY11 Service Contract Inventory... Contract Inventory. SUMMARY: The Department of State has publically released its Service Contract Inventory.../ . Section 743 of Division C of the FY 2010 Consolidated Appropriations Act, Public Law 111-117, requires...

  15. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation law enforcement contracts and... PROJECTS Program Requirements § 422.9 Reclamation law enforcement contracts and cooperative agreements. (a... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation law...

  16. Closing the Inter-Agency Gap: Role of the Marine Infantry Battalion on the Future Battlefield

    Science.gov (United States)

    2010-04-26

    Master of Military Studies Research Paper September 2009- April2010 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER Closing the Inter-Agency Gap : Role of the...battlalion the future battlefield will be to close the inter-agency gap by utilizing a comprehensive government approach to locate, close with, and...

  17. 48 CFR 317.7002 - Potential multi-agency and intra-agency sources.

    Science.gov (United States)

    2010-10-01

    ... vehicle is the best way to obtain the required product or service. (c) With the exception of assisted... provides; and describe the compensation arrangement(s). The assigned contracting office shall be one of the...

  18. 45 CFR 1386.30 - State plan requirements.

    Science.gov (United States)

    2010-10-01

    ... Designated State Agency to determine that the plan is not in conflict with applicable State laws and to... applicable State laws and policies regarding grants and contracts and proper accounting and bookkeeping...

  19. 48 CFR 46.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  20. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  1. Second review meeting of the Contracting Parties to the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    Rafferty, Barbara

    2002-01-01

    The Second Review Meeting of the Contracting Parties to the Convention on Nuclear Safety was held in the Headquarters of the International Atomic Energy Agency in Vienna from 15-26 April 2002, under the chairmanship of the President, Mr Miroslav Gregoric, Director of the Slovenian Nuclear Safety Authority. The Convention on Nuclear Safety entered into force in October 1996, has been signed by sixty-five States and ratified by fifty-four, bringing within its scope 428 of the 448 nuclear reactors worldwide. The Convention aims to achieve and maintain a high level of nuclear safety worldwide, through inter alia enhancement of national measures and international co-operation. Obligations on Contracting Parties in accordance with the Convention include: the establishment and maintenance of a legislative and regulatory framework to govern the safety of land-based civil nuclear installations; the allocation of adequate financial and human resources to support the safety objectives; ensuring that all reasonably practicable improvements to safety are made as a matter of urgency. Adherence to this Convention entails two basic commitments by each Contracting Party: to prepare and make available a national report for review; and to subject its national report to a peer review by the other Contracting Parties. Thus, being a Contracting Party to this Convention involves: including in the national report a self-assessment of steps and measures already taken and in progress to implement the Convention obligations; taking an active part in an open and transparent review of its national report and the Reports of other Contracting Parties; and a commitment to a continuous learning and improving process, something which is a key element of a strong safety culture. The peer review of national reports takes place every three years, the first having been held in 1999. The Second Review Meeting was attended by delegates from 46 contracting parties. During the review certain issues were

  2. The obligation to contract in British law

    Directory of Open Access Journals (Sweden)

    Verena Klappstein

    2014-06-01

    Full Text Available Nowadays the obligation to contract is rarely looked upon. Without reason though, because it is neither outdated nor inoperable. Based on three common law doctrines the obligation to contract goes back to the Middle Ages. It has not lost its relevance, as it can still be found in modern statutory law, such as in the electricity and mail sector. What is more, it is a fundamental institution with a great impact. The analysis showed that the five chosen forms of obligations to contract bear analogical requirements but very similar rationales and economic consequences. It sets impaired market power right and it overstrikes irrational behaviour of market participants. As overall achievement it aligns the range of property, freedom of contract and freedom of competition.

  3. Assessment of the 2005-2008 State-ANDRA contract

    International Nuclear Information System (INIS)

    2008-01-01

    This report proposes an assessment of the activity of the ANDRA (French national Agency for radioactive waste management) with respect to its different missions, i.e., an industrial mission, a research mission, and an information mission, but also with respect to evaluation practices and to its human resources. For each of these main issues, this report recalls the objectives as they were defined in the 2005-2008 contract and indicates what has been done about

  4. Invalidity of contract: legislative regulation and types

    Directory of Open Access Journals (Sweden)

    Василь Іванович Крат

    2017-09-01

    Full Text Available Invalidity contracts always attracted attention researchers. Without regard to it, in modern conditions there is an enormous layer of the problems related to invalidity contract, that to require a doctrine and utilitarian comprehension. The article is sanctified to research invalidity contract. In the article analyses problems of the legislative regulation and types of invalidity contract through the prism of judicial practice. In the Civil code of Ukraine, a voidable contract sets as a common rule. A voidable of the contract is incarnated in the so-called «virtual» invalidity when only the most typical grounds are enumerated. However, even such approach does not allow to overcome all possible cases that arise up in practice. Such situation touches possibility of voidable contracts concluded with the purpose of to shut out the appeal of claim to the property of the debtor. Therefore it follows to set general rules in relation to voidable contracts of the debtor. A nullity of the contract takes place only in the case when there is the direct pointing of law on the qualification of that or another contract as the nullity. The nullity of contract in the Civil code of Ukraine is constructed by means of «textual» invalidity. There are no single attempts to use the construction of «virtual» invalidity in judicial practice when there is the direct pointing of law on the qualification of that or another contract as the nullity, that is impermissible. Methodologically incorrectly to carry out identifying of invalidity contract and obligation with the aim of providing of application of different after the rich in content filling norms.

  5. 41 CFR 102-37.115 - May a holding agency be reimbursed for costs incurred incident to a donation?

    Science.gov (United States)

    2010-07-01

    ... reimbursed for costs incurred incident to a donation? 102-37.115 Section 102-37.115 Public Contracts and... REGULATION PERSONAL PROPERTY 37-DONATION OF SURPLUS PERSONAL PROPERTY Holding Agency § 102-37.115 May a holding agency be reimbursed for costs incurred incident to a donation? Yes, you, as a holding agency, may...

  6. 76 FR 4322 - Availability of the Fiscal Year 2009 Missile Defense Agency Services Contracts Inventory Pursuant...

    Science.gov (United States)

    2011-01-25

    ... DEPARTMENT OF DEFENSE Office of the Secretary Availability of the Fiscal Year 2009 Missile Defense... Act AGENCY: Missile Defense Agency (MDA), DoD. ACTION: Notice of availability. SUMMARY: In accordance... for Fiscal Year 2008 (NDAA 08) Section 807, the Director of the Missile Defense Agency and the Office...

  7. Searching for Contracting Patterns over Time: Do Prime Contractor and Subcontractor Relations Follow Similar Patterns for Professional Services Provision?

    Science.gov (United States)

    Ponomariov, Branco; Kingsley, Gordon; Boardman, Craig

    2011-01-01

    This paper compares over a 12-year period (1) patterns of contracting between a state transportation agency and its prime contractors providing engineering design services with (2) patterns between these prime contractors and their subcontractors. We find evidence of different contracting patterns at each level that emerge over time and coexist in…

  8. Legal issues relating to the Ontario FIT contract - An update

    International Nuclear Information System (INIS)

    Weizman, Michael

    2011-01-01

    The paper discusses the legal issues related to the Ontario FIT contract, which includes the FIT waiver agreement, WTO challenge, FIT extension, political risk assessment and issues related to unforeseen events beyond human control (force majeure). The risk of termination of the FIT waiver is omitted for convenience by OPA but timing implications relating to the FIT waiver are included. The binding agreement for supply of generating equipment is also presented and the term sheet for turbine equipment and bill of purchase being understood as binding agreements is questioned. Political risks relate to existing contracts, lawsuit risks and changes to the REA process. Change in government and the implications of minority government can be added to the political risks. A successful WTO challenge has been assumed and the possible implications are discussed. Some of them include risk to FIT contracts already issued; changes in DC requirements and in FIT contract pricing and re-pricing of construction and turbine equipment supply contracts if DC requirements are relaxed.

  9. 75 FR 10272 - Notice Regarding 340B Drug Pricing Program-Contract Pharmacy Services

    Science.gov (United States)

    2010-03-05

    ... Regarding 340B Drug Pricing Program--Contract Pharmacy Services AGENCY: Health Resources and Services... drug pricing program by which manufacturers who sell covered outpatient drugs to particular covered... provisions, which had been previously limited to the Alternative Methods Demonstration Project program. FOR...

  10. 78 FR 37692 - Federal Acquisition Regulation; Contracting With Women-Owned Small Business Concerns

    Science.gov (United States)

    2013-06-21

    ...-AM59 Federal Acquisition Regulation; Contracting With Women-Owned Small Business Concerns AGENCY... disadvantaged women-owned small business concerns and to women-owned small business concerns eligible under the Women-owned Small Business Program. DATES: Effective Date: June 21, 2013. Comment Date: Interested...

  11. An Analytical Evaluation of Contingency Contracting Operations in Iraq and Afghanistan: Capturing Critical Corporate Knowledge for the Future

    Science.gov (United States)

    2013-01-07

    of contracting dollars from prime to sub-contractors and perform financial forensics on contracts and contractors (Abi-Habib & Rosenberg, 2010...organization would need, at a minimum  Contracting expertise,  Forensic finance and intelligence expertise,  Defense agencies liaison...8217C: eui~nce Olld tools to se.unkssJy iot ~tc OCS and CE. W pl3i\\Jtil~ 30d c:ecut.ion c:quldC":J. • lnl<:£.r.llc OCS clc:mcots ond i59.tes into

  12. The advantages of cost plus award fee contracts

    Science.gov (United States)

    Keathley, William C.

    1994-01-01

    A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

  13. Can labour contract differences in health and work-related attitudes be explained by quality of working life and job insecurity?

    Science.gov (United States)

    Wagenaar, Alfred F; Kompier, Michiel A J; Houtman, Irene L D; van den Bossche, Seth; Smulders, Peter; Taris, Toon W

    2012-10-01

    We hypothesise that due to a lower quality of working life and higher job insecurity, the health and work-related attitudes of temporary workers may be less positive compared to permanent workers. Therefore, we aimed to (1) examine differences between contract groups (i.e. permanent contract, temporary contract with prospect of permanent work, fixed-term contract, temporary agency contract and on-call contract) in the quality of working life, job insecurity, health and work-related attitudes and (2) investigate whether these latter contract group differences in health and work-related attitudes can be explained by differences in the quality of working life and/or job insecurity. Data were collected from the Netherlands Working Conditions Survey 2008 (N = 21,639), and Hypotheses were tested using analysis of variance and cross-table analysis. Temporary work was associated with fewer task demands and lower autonomy and was more often passive or high-strain work, while permanent work was more often active work. Except for on-call work, temporary work was more insecure and associated with worse health and work-related attitude scores than permanent work. Finally, the quality of working life and job insecurity partly accounted for most contract differences in work-related attitudes but not in health. Especially agency workers have a lower health status and worse work-related attitudes. Job redesign measures regarding their quality of working life and job insecurity are recommended.

  14. 40 CFR 35.938-5 - Negotiation of contract amendments (change orders).

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Negotiation of contract amendments (change orders). 35.938-5 Section 35.938-5 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.938-5 Negotiation of...

  15. 48 CFR 39.103 - Modular contracting.

    Science.gov (United States)

    2010-10-01

    ... the Government is not required to procure additional increments. (e) To avoid obsolescence, a modular... maximum extent practicable, deliveries under the contract should be scheduled to occur within 18 months...

  16. An empirical typology of private child and family serving agencies.

    Science.gov (United States)

    Chuang, Emmeline; Collins-Camargo, Crystal; McBeath, Bowen; Wells, Rebecca; Bunger, Alicia

    2014-03-01

    Differences in how services are organized and delivered can contribute significantly to variation in outcomes experienced by children and families. However, few comparative studies identify the strengths and limitations of alternative delivery system configurations. The current study provides the first empirical typology of private agencies involved with the formal child welfare system. Data collected in 2011 from a national sample of private agencies were used to classify agencies into five distinct groups based on internal management capacity, service diversification, integration, and policy advocacy. Findings reveal considerable heterogeneity in the population of private child and family serving agencies. Cross-group comparisons suggest that differences in agencies' strategic and structural characteristics correlated with agency directors' perceptions of different pressures in their external environment. Future research can use this typology to better understand local service systems and the extent to which different agency strategies affect performance and other outcomes. Such information has implications for public agency contracting decisions and could inform system-level assessment and planning of services for children and families.

  17. 49 CFR 1313.7 - Contract summary for grain products-involving a port.

    Science.gov (United States)

    2010-10-01

    ... the contract. (ii) The termination date of the contract, and any terms for automatic extension or... type (e.g. single-car, multiple-car, unit-train) or minimum volume requirements. (6) Special features..., guaranteed car supply, minimum percentage of traffic requirements, credit terms, discounts, etc. (7) Rail car...

  18. Federal technology transfer requirements :a focused study of principal agencies approaches with implications for the Department of Homeland Security.

    Energy Technology Data Exchange (ETDEWEB)

    Koker, Denise; Micheau, Jill M.

    2006-07-01

    This report provides relevant information and analysis to the Department of Homeland Security (DHS) that will assist DHS in determining how to meet the requirements of federal technology transfer legislation. These legal requirements are grouped into five categories: (1) establishing an Office of Research and Technology Applications, or providing the functions thereof; (2) information management; (3) enabling agreements with non-federal partners; (4) royalty sharing; and (5) invention ownership/obligations. These five categories provide the organizing framework for this study, which benchmarks other federal agencies/laboratories engaged in technology transfer/transition Four key agencies--the Department of Health & Human Services (HHS), the U.S. Department of Agriculture (USDA), the Department of Energy (DOE), and the Department of Defense (DoD)--and several of their laboratories have been surveyed. An analysis of DHS's mission needs for commercializing R&D compared to those agencies/laboratories is presented with implications and next steps for DHS's consideration. Federal technology transfer legislation, requirements, and practices have evolved over the decades as agencies and laboratories have grown more knowledgeable and sophisticated in their efforts to conduct technology transfer and as needs and opinions in the federal sector have changed with regards to what is appropriate. The need to address requirements in a fairly thorough manner has, therefore, resulted in a lengthy paper. There are two ways to find summary information. Each chapter concludes with a summary, and there is an overall ''Summary and Next Steps'' chapter on pages 57-60. For those readers who are unable to read the entire document, we recommend referring to these pages.

  19. Game-Theoretic Models for Usage-based Maintenance Contract

    Science.gov (United States)

    Husniah, H.; Wangsaputra, R.; Cakravastia, A.; Iskandar, B. P.

    2018-03-01

    A usage-based maintenance contracts with coordination and non coordination between two parties is studied in this paper. The contract is applied to a dump truck operated in a mining industry. The situation under study is that an agent offers service contract to the owner of the truck after warranty ends. This contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the owner will be charged an additional cost. In general, the agent (Original Equipment Manufacturer/OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. The decision problem for the owner is to select the best option offered that fits to its requirement, and the decision problem for the agent is to find the optimal maintenance efforts for a given price of the service option offered. We first find the optimal decisions using coordination scheme and then with non coordination scheme for both parties.

  20. 77 FR 5253 - Public Availability of General Services Administration FY 2011 Service Contract Inventory

    Science.gov (United States)

    2012-02-02

    ... GENERAL SERVICES ADMINISTRATION [Notice-MV-2012-01; Docket 2012-0002; Sequence 3] Public Availability of General Services Administration FY 2011 Service Contract Inventory AGENCY: Office of Acquisition Policy (MV); General Services Administration (GSA). ACTION: Notice of public availability of FY...